SED Project Status

If you have a question about the status of your project awaiting review, please consult our status reports page first. Upon receipt of your project, your project manager will call you to identify missing items, if necessary. Upon architectural/mechanical review, our A/Es will do likewise.

SED Project Review Status As of 01/03/2024

  • Architectural Review

    • The average time for a final architectural review will be about 20-22 weeks.
    • The next architectural review will be 23-0190. It was logged into the review system on 08/04/23.
  • Engineering Review

    • The average time for the final engineering review will be about 22-24 weeks.
    • The next engineering review will be 23-0185. It was logged into the review system on 08/01/23.
  • The most recent submission has review number 23-1312. It was logged into the review system on 01/02/2024.
  • The last review number assigned for 2022 was 22-2492. It was logged into the review system on 06/30/2023.