Facilities Planning
- Project Management
- Bonds
- Building Aid
- Cost Index and Reports
- Fiscal Reviews
- Technical Reviews
- SEQR Guidelines
- Capital Construction Project Change Order Status
- Capital Construction Project Review and Approval Status
- Definition of Emergency Project
- Fiscal Associate List by District
- Project Review Status
- Capital Construction: Pittfalls To Avoid
- Project Review - A/E
- 155.5 Regulation Section Must Be Paper-Clipped
- Review Process at Facilities Planning
- School Facility Report Card
- FAQ
- Important Links
- Forms & Manuals
- Finance / QZAB / QSCB
- Surveys & Fire Safety
- AHERA, Health, Safety and Emergencies
- AHERA Requirements Reminder
- Asbestos Reinspection
- Get the Lead Out
- Green Cleaning in Schools
- Incident Command System for Schools
- Mercury Q&A for Schools
- Minimum Temperature in Schools
- Reminder of Annual AHERA Notifications to Employees and Parents
- School Pesticide Neighbor Notification Definitions
- School Pesticide Neighbor Notification Law Reminder
- Toilet/Urinal Deodorizer’s Containing Paradichlorobenzene
- Child Safety-Injury Prevention Websites
- School Integrated Pest Management & Neighbor Notification
- School Pesticide Neighbor Notification Clarification
- Building Condition Survey and Visual Inspection
- Fire Safety & C of O & O and M
- AHERA, Health, Safety and Emergencies
- Additional Resources
- Articles That Answer FAQs
- AHERA Definition of School Buildings That Must Be Inspected
- AHERA Surveillance Requirement
- AHERA Warning Labels
- Annual AHERA Notification
- Approved Bidding Documents
- Approved Laboratories for Testing Asbestos
- Authorizing School Construction
- Avoid Delays in Payment of Building Aid
- Bidding Capital Construction Projects
- Bidding Cost Control
- Bleacher Inspections
- Building Access Control Devices
- Building Aid - Revision of Financial Information
- Capital Construction Bids
- Capital Construction Projects - Eligibility for Building Aid
- Capital Construction Projects Funded by Donations or Grants
- Certificate of Occupancy
- Change Orders
- Competitive Bidding - Or Equal and Bidding Cost Control
- Controlling Outdoor Sources of Indoor Air Pollution
- Crayons and Asbestos
- Decorating for the Holiday Season
- Definitions of Capital Construction Projects
- Electric Booster Water Heaters
- Electric Folding Partitions
- Electrically Powered Movable Partitions
- Electrically Powered Partition Warning Signs Required
- Emergency Evacuation of Non-Ambulatory Disabled Individuals
- Energy Efficiency
- Energy Information
- Energy Performance Contracts
- FAQs Concerning RESCUE Aid
- Federal Low and Zero Interest Bonds for School Construction
- Final Building Project Report
- Final Building Project Report Hints
- Financing School Construction
- Fire Alarm Annunciator Panels
- Fire Alarms & the Fire Department & Building Jurisdiction
- Fire Safety in School Buildings
- Fluorescent Bulbs Are Hazardous Waste
- Fuel Tank Projects
- Guidelines for the Health and Safety Committee
- Have All Your School Buildings Been Inspected for Asbestos
- Health and Safety Committees
- Highway Letter
- Ice and Snow Loads Warning
- Injection Wells
- Instruction in Arson and Fire Prevention
- Lead Abatement Clarification
- Lead and Copper Rule
- Letter of Intent for Capital Construction Projects
- Long-Range Plan & Maintenance & Repair
- Manufactured Classroom Toilet Policy
- Metal Halide Lamps
- New Change Order Process
- Notification of Building Project & Form SA-4
- Obtaining Professional Services
- Oil Spills - Leaking Tanks
- Organizational Pattern
- Performance and Payment Bonds on Public Work
- Planning a Field Trip
- Playground Installations
- Policy Memos
- Preliminary Submissions
- Press Boxes
- Prevailing Wage Rates
- Projecting Student Enrollments
- Procedures for Filing a Fire Inspection Report
- Public Information – What Are the Rights?
- Recycling Solid Wastes
- Reference Guide to Capital Construction
- Revised Posting Procedures
- Room Sizes for Special Education Classrooms
- Sanitary Law
- School Site Variance
- School Sites
- Schools as Emergency Shelters
- Schools Emergency Management Information and Drills
- SED Numbers and What They Mean
- Separation of Construction from Occupied buildings
- Separation of Construction Sites From Occupied Areas
- SEQR - Approval of Preliminary Plans
- Storage of Regent's Examinations
- Structural Inspections & Fire Inspection
- The Project Management System
- Thunderstorm Safety and Outdoor Events
- Tobacco
- Underground Fuel Storage Tanks
- Uniform Safety Standards for School Construction and Maintenance Projects
- Use of Truck Shipping Containers
- Vaults for Storing Examination Materials
- Ventilation Standards
- Waste Disposal
- When Is a Building Permit Required?
- About Us
- Office Directory & Related Sites
- Publications
- Articles That Answer FAQs