BURNT HILLS-BALLSTON LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-01-01-06
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Burnt Hills Senior High:
18-1316   Reconstruction               0-003-035  03/12/19     DONE    DONE       DONE      01/23/19   01/14/19   11/15/18   10/23/18   2,7                    1,100,000     1,100,000  BMJ             0           0           0 Mosaic Associates                       0      01/14/20                       01/14/19           
19-1199XX Reconstruction               0-003-036  02/27/20               CANCELLED          01/13/20   01/03/20   11/27/19   10/23/18   16                        80,000        80,000  JSS             0           0           0 Mosaic Associates                       0        /  /                         01/03/20           
  -    PR Additions and Alterations    0-003-037                                              /  /       /  /     08/11/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
20-0416   Additions and Alterations    0-003-037  12/21/20     DONE    DONE       DONE      09/22/20   09/10/20   08/11/20   10/23/18   02 - 16               14,363,000    14,150,345  JSS             0           0           0 Mosaic Associates                       0        /  /                         09/10/20           
21-1430   Reconstruction               0-003-038  04/15/22     DONE    DONE       DONE      03/04/22   03/02/22   01/26/22   10/23/18   2,4,8,9                1,376,000     1,376,000  SLC             0           0           0 Mosaic Associates                       0      08/11/23                       03/02/22           
22-1584   Reconstruction               0-003-039  08/28/23     DONE    DONE       DONE      01/30/23   01/27/23   12/06/22   05/17/22   2,9,155                  142,000       142,000  MSK             0           0           0 Ashley McGraw                           0        /  /                         01/27/23           
23-0893   Reconstruction               0-003-040  01/05/24     DONE    DONE       DONE      11/06/23   10/25/23   06/29/23   05/16/23   9,10                     100,000       100,000  MSK             0           0           0 Ashley McGraw                           0        /  /                         10/25/23           
23-1276   Reconstruction               0-003-041                         UNREVIEWED         12/22/23   12/21/23   09/12/23   10/24/23   7                              0             0  MSK             0           0           0 Ashley McGraw                           0        /  /                         12/21/23           

          Stevens Elementary:
  -    XX Reconstruction               0-004-025                         CANCELLED            /  /       /  /     03/12/19     /  /     2,8,9,10,155,15,16             0    13,207,644  BMJ             0           0           0                                         0        /  /                           /  /             
19-0448   Reconstruction               0-004-026  10/09/19     DONE    DONE       DONE      09/20/19   09/13/19   07/16/19   05/21/19   16                       100,000       100,000  JSS             0           0           0 Mosaic Associates                       0      06/12/20                       09/13/19           
21-1431   Reconstruction               0-004-027  04/15/22     DONE    DONE       DONE      03/04/22   03/02/22   01/26/22   10/23/18   2,9,10,15,16           1,203,000     1,203,000  SLC             0           0           0 Mosaic Associates                       0      08/11/23                       03/02/22           
23-1277   Reconstruction               0-004-028                         UNREVIEWED         12/22/23   12/21/23   09/12/23   10/24/23   7                              0             0  MSK             0           0           0 Ashley McGraw                           0        /  /                         12/21/23           

          Pashley Elementary School:
18-1317   Reconstruction               0-006-021  03/12/19     DONE    DONE       DONE      01/23/19   01/14/19   11/15/18   10/23/18   2,7                      495,000       495,000  BMJ             0           0           0 Mosaic Associates                       0      01/14/20                       01/14/19           
  -    XX Reconstruction               0-006-022                         CANCELLED            /  /       /  /     04/15/19     /  /     16                             0    13,207,644  BMJ             0           0           0                                         0        /  /                           /  /             
20-0026   Reconstruction               0-006-023  08/25/20     DONE    DONE       DONE      07/07/20   06/23/20   04/14/20   06/09/20   16                       100,000       100,000  JLB             0           0           0 Mosaic Associates                       0      05/14/21                       06/23/20           
20-0417   Reconstruction               0-006-024  12/21/20     DONE    DONE       DONE      09/22/20   09/10/20   08/11/20   10/23/18   2,7,9,155,15,16          574,000       574,000  JSS             0           0           0 Mosaic Associates                       0      10/05/22                       09/10/20           
20-0418   Reconstruction               0-006-025  12/21/20     DONE    DONE       DONE      09/22/20   09/10/20   08/26/20   10/22/13   2,9,15                   779,000       779,000  JSS             0           0           0 Mosaic Associates                       0      10/05/22                       09/10/20           
21-1432   Reconstruction               0-006-026  04/15/22     DONE    DONE       DONE      03/04/22   03/02/22   01/26/22   10/23/18   2,8,9,10,15,16            91,000        91,000  SLC             0           0           0 Mosaic Associates                       0      08/11/23                       03/02/22           
23-1278   Reconstruction               0-006-027                         UNREVIEWED         12/22/23   12/21/23   09/12/23   10/24/23   7                              0             0  MSK             0           0           0 Ashley McGraw                           0        /  /                         12/21/23           

          Charlton Hghts. Elementary:
  -    XX Reconstruction               0-008-019                         CANCELLED            /  /       /  /     04/15/19     /  /     16                             0    11,976,280  BMJ             0           0           0                                         0        /  /                           /  /             
21-1433   Reconstruction               0-008-020  04/15/22     DONE    DONE       DONE      03/04/22   03/02/22   09/23/21   10/23/18   2,8,9,10,15,16           250,000       250,000  SLC             0           0           0 Mosaic Associates                       0      08/11/23                       03/02/22           
21-0816   Reconstruction               0-008-021  02/10/22     DONE    DONE       DONE      12/02/21   11/30/21   09/23/21   05/18/21   16                       100,000       100,000  SLC             0           0           0 Mosaic Associates                       0      06/09/22                       11/30/21           
  -       Reconstruction               0-008-022                                              /  /       /  /       /  /       /  /                                    0             0  SLC             0           0           0                                         0        /  /                           /  /             
22-1585   Reconstruction               0-008-023  08/28/23     DONE    DONE       DONE      01/30/23   01/27/23   12/06/22   05/17/22   2,9,15                   135,000       135,000  MSK             0           0           0 Ashley McGraw                           0        /  /                         01/27/23           
23-1279   Reconstruction               0-008-024                         UNREVIEWED         12/22/23   12/21/23   09/12/23   10/24/23   2,7                            0             0  MSK             0           0           0 Ashley McGraw                           0        /  /                         12/21/23           

          O'Rourke Middle School:
18-1318   Reconstruction               0-010-025  03/12/19     DONE    DONE       DONE      01/23/19   01/14/19   11/15/18   10/23/18   2,7                    1,155,000     1,155,000  BMJ             0           0           0 Mosaic Associates                       0      01/14/20                       01/14/19           
18-1374   Reconstruction               0-010-026  04/26/19     DONE    DONE       DONE      01/31/19   01/09/19   11/15/18   09/18/18   16                       100,000       100,000  BMJ             0           0           0 C&S Companies                           0      06/30/19                       01/09/19           
19-0858   Reconstruction               0-010-027  03/02/20     DONE    DONE       DONE      11/21/19   11/08/19   03/12/19   10/23/18   2,4,7,8,9,10,155,15,   7,670,000     7,670,000  JSS             0           0           0 Mosaic Associates                       0      04/27/21                       11/08/19           
22-1586   Reconstruction               0-010-028  08/28/23     DONE    DONE       DONE      01/30/23   01/27/23   12/06/22   05/17/22   2,9,15                   339,000       339,000  MSK             0           0           0 Ashley McGraw                           0        /  /                         01/27/23           
23-1280   Reconstruction               0-010-029                         UNREVIEWED         12/22/23   12/21/23   09/12/23   10/24/23   2,7                            0             0  MSK             0           0           0 Ashley McGraw                           0        /  /                         12/21/23           

          Walk-in Cooler/Freezer:
  -    DB Discovered Building          2-020-001                                              /  /       /  /     11/09/23     /  /                                    0             0  MSK             0           0           0                                         0        /  /                           /  /             

          Maintenance Center(Frmr.Bus Garage):
23-1281   Reconstruction               3-005-001                         UNREVIEWED         12/22/23   12/21/23   09/12/23   10/24/23   7                              0             0  MSK             0           0           0 Ashley McGraw                           0        /  /                         12/21/23           

          Maintenance Garage:
23-1282   Reconstruction               5-002-002                         UNREVIEWED         12/22/23   12/21/23   09/12/23   10/24/23   7                              0             0  MSK             0           0           0 Ashley McGraw                           0        /  /                         12/21/23           

          Transportation Center:
19-0675PR New Construction             5-019-001               DONE                         11/04/19     /  /     03/13/19     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
19-0859   New Construction             5-019-001  03/02/20     DONE    DONE       DONE      11/21/19   11/08/19   03/13/19   10/23/18   02 - 16               10,650,000    10,650,000  JSS             0           0           0 Mosaic Associates                       0      10/27/21                       11/08/19           
22-1362   Reconstruction               5-019-002  03/29/23     DONE    DONE       DONE      12/28/22   12/23/22   11/04/22   05/17/22   2,7,16                   100,000       100,000  JLB             0           0           0 Ashley McGraw                           0      06/16/23                       12/23/22           

          District-Wide:
19-0167   Reconstruction               7-999-004  10/03/19     DONE    DONE       DONE      07/26/19   07/24/19   02/22/19   10/23/18   16                       110,000       110,000  JSS             0           0           0 Mosaic Associates                       0      06/22/20                       07/24/19           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED

SHENENDEHOWA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-03-02-06
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Acadia-Gowana-Koda Middle School:
18-0424   Reconstruction               0-001-035  03/14/19     DONE    DONE       DONE      09/11/18   09/05/18   10/27/17   05/17/16   2,4,7,8,9,10,155,15,      84,835        84,835  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
18-0400   Reconstruction               0-001-037  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   2,9,15,16              2,551,000     2,551,000  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
21-0759   Reconstruction               0-001-038  01/25/22     DONE    DONE       DONE      11/19/21   11/19/21   06/17/21   05/18/21   2,9,15,16              3,389,882     3,389,882  SLC             0           0           0 Mosaic Associates                       0        /  /                         11/19/21           
22-1035   Reconstruction               0-001-039  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/18/21   2,4,7,8,9,155,15,16    4,241,588     4,241,588  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           

          High School West(fmly Koda MS):
18-0425   Reconstruction               0-004-026  03/14/19     DONE    DONE       DONE      09/11/18   09/05/18   10/27/17   05/17/16   2,4,7,8,9,10,155,15,   1,019,500     1,019,500  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
18-0401   Reconstruction               0-004-027  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   9,15,16                   26,081        26,081  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
21-0760   Reconstruction               0-004-028  01/25/22     DONE    DONE       DONE      11/19/21   11/19/21   06/17/21   05/18/21   2,7,8,9,16               336,886       336,886  SLC             0           0           0 Mosaic Associates                       0        /  /                         11/19/21           
23-0772   Reconstruction               0-004-029                         UNREVIEWED         10/23/23   10/17/23   04/19/23   05/18/21   2                              0             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         10/17/23           

          Skano-Tesago Elementary School:
18-0426   Reconstruction               0-006-025  03/14/19     DONE    DONE       DONE      09/11/18   09/05/18   10/27/17   05/17/16   2,9,10,155,16            200,325       200,325  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
18-0402   Reconstruction               0-006-026  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   9,15,16                   26,081        26,081  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
22-1036   Reconstruction               0-006-027  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/18/21   2,9,155,15,16          2,558,733     2,558,733  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           

          Karigon-Orenda Elementary:
18-0427   Reconstruction               0-007-022  03/14/19     DONE    DONE       DONE      09/11/18   09/05/18   10/27/17   05/17/16   2,9,10,155,16            200,325       200,325  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
18-0403   Reconstruction               0-007-023  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   9,15,16                   26,081        26,081  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
22-1037   Reconstruction               0-007-024  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/18/21   2,9,155,15,16          1,515,325     1,515,325  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           

          High School East:
18-0428   Reconstruction               0-008-027  03/14/19     DONE    DONE       DONE      09/11/18   09/05/18   10/27/17   05/17/16   2,4,7,8,9,10,13,155,     179,100       179,100  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
18-1835XX Reconstruction               0-008-028                         CANCELLED          04/11/19     /  /     03/12/19     /  /     2,4,7,8,9,10,155,15,           0             0  SLC             0           0           0                                         0        /  /                           /  /             
19-1017   Reconstruction               0-008-028  03/04/20     DONE    DONE       DONE      12/17/19   11/25/19   03/12/19   12/05/17   2,4,7,8,9,10,155,15,  11,580,000    11,580,000  SLC             0           0           0 Mosaic Associates                       0      12/22/21                       11/25/19           
18-0404   Reconstruction               0-008-029  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   2,4,7,8,9,10,155,15,   3,078,500     3,078,500  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
21-0761   Reconstruction               0-008-030  01/25/22     DONE    DONE       DONE      11/19/21   11/19/21   06/17/21   05/18/21   2,7                    2,653,914     2,653,914  SLC             0           0           0 Mosaic Associates                       0        /  /                         11/19/21           
22-1038   Reconstruction               0-008-031  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/18/21   2,4,8,9,155,15,16      3,394,671     3,394,671  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           
21-1990   Reconstruction               0-008-032  11/22/22     DONE    DONE       DONE      06/17/22   06/15/22   05/13/22   05/18/21   2,9                      700,215       700,215  WLC             0           0           0 Mosaic Associates                       0        /  /                         06/15/22           
23-0773   Reconstruction               0-008-033                         UNREVIEWED         10/23/23   10/17/23   04/19/23   05/18/21   2,8,15                         0             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         10/17/23           
23-0489   Reconstruction               0-008-034                         UNREVIEWED         09/15/23   09/12/23   09/06/23   05/18/21   155,16                   480,000             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         09/12/23           

          Chango Elementary:
18-0405   Reconstruction               0-010-015  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   9,15,16                   26,081        26,081  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
22-1039   Reconstruction               0-010-016  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/18/21   2,9,155,15,16          1,125,300     1,125,300  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           

          Okte Elementary:
18-0406   Reconstruction               0-011-015  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   9,15,16                   26,081        26,081  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
22-1040   Reconstruction               0-011-016  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/18/21   2,9,155,15,16            788,294       788,294  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           

          Arongen E.S.(fmly ES #8):
19-0449   Reconstruction               0-031-013  12/12/19     DONE    DONE       DONE      09/20/19   09/12/19   07/15/19   05/21/19   7,9                      100,000       100,000  SLC             0           0           0 Mosaic Associates                       0      06/12/20                       09/12/19           
20-1611   Reconstruction               0-031-014  04/29/21     DONE    DONE       DONE      04/22/21   04/19/21   03/02/21   05/17/16   2,4,7,9,155,16           947,000       947,000  SLC             0           0           0 Mosaic Associates                       0      07/26/22                       04/19/21           
21-0762   Reconstruction               0-031-015  01/25/22     DONE    DONE       DONE      11/19/21   11/19/21   06/17/21   05/18/21   2,7,8,9,155,15,16      1,380,391     1,380,391  SLC             0           0           0 Mosaic Associates                       0        /  /                         11/19/21           

          XXTechnology Center - Cancelled:
18-1836XX New Construction             0-079-001                         CANCELLED          04/11/19     /  /     03/11/19     /  /     02 - 16                        0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Early Learning Center:
  -    PR New Construction             0-080-001                                              /  /       /  /     10/20/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          District Office:
18-0429   Reconstruction               1-052-005  03/14/19     DONE    DONE       DONE      09/11/18   09/05/18   10/30/17   05/17/16   2,4,7,8,9,10,155,15,     457,975             0  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
21-1709   Reconstruction               1-052-006  11/23/22     DONE    DONE       DONE      04/27/22   04/22/22   06/17/21   05/18/21   2,155,15,16            1,446,363             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         04/22/22           

          Grounds Building:
22-1041   Reconstruction               3-045-003  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/08/21   15,16                     39,587             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           

          Bus Garage:
18-0407   Reconstruction               5-003-015  03/13/19     DONE    DONE       DONE      09/10/18   09/05/18   03/27/18   12/05/17   9,14,155,15,16         1,043,900     1,043,900  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
22-1042   Reconstruction               5-003-016  01/27/23     DONE    DONE       DONE      11/18/22   11/17/22   01/13/22   05/18/21   15,16                    316,696       316,696  WLC             0           0           0 Mosaic Associates                       0        /  /                         11/17/22           
23-0490   Reconstruction               5-003-017                         UNREVIEWED         09/15/23   09/12/23   09/06/23   05/18/21   2,16                     100,000             0  WLC             0           0           0 Mosaic Associates                       0        /  /                         09/12/23           

          District Wide Tech.:
18-0430   Reconstruction               7-999-004  03/14/19     DONE    DONE       DONE      09/11/18   09/05/18   02/05/18   05/17/16   2,10                     581,325       581,325  SLC             0           0           0 Mosaic Associates                       0      12/23/20                       09/05/18           
18-0433   Reconstruction               7-999-005  05/31/19     DONE    DONE       DONE      09/14/18   09/05/18   04/11/18   12/05/17                          4,992,800     4,721,304  SLC             0           0           0 Mosaic Associates                       0      11/09/22                       09/05/18           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED

CORINTH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-04-01-04
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Oak StreetMiddle/High School:
19-0876   Reconstruction               0-001-031  01/24/20     DONE    DONE       DONE      11/27/19   11/18/19   03/27/19   05/17/16   2,7,8,9,10,16            762,000       762,000  JSS             0           0           0 Clark Patterson Lee                     0      10/22/20                       11/18/19           
20-1319   Reconstruction               0-001-032  05/19/21     DONE    DONE       DONE      02/19/21   02/09/21   10/15/20   05/17/16   2,4,8,9,10,14,155,16     230,000       230,000  JSS             0           0           0 Bernier Carr Associates                 0      02/21/22                       02/09/21           
  -    PR Additions and Alterations    0-001-033                                              /  /       /  /     03/15/21     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                           /  /             
21-0956   Additions and Alterations    0-001-033  05/23/22     DONE    DONE       DONE      12/27/21   12/22/21   03/15/21   02/09/21   02 - 16               11,319,229    10,872,434  JLB             0           0           0 Bernier Carr Associates                 0        /  /                         12/22/21           
21-0255   Reconstruction               0-001-034  10/27/21     DONE    DONE       DONE      09/01/21   08/30/21   05/21/21   05/18/21   8,9,16                   100,000       100,000  JLB             0           0           0 Bernier Carr Associates                 0      05/27/22                       08/30/21           
21-1507FA Reconstruction               0-001-035  04/27/22     DONE    DONE       DONE      03/14/22   03/14/22   01/18/22   01/24/22   2,15                   1,340,000     1,340,000  JLB             0           0           0 Bernier, Carr & Associates              0      10/27/22                       03/14/22           
22-0628   Reconstruction               0-001-036  11/15/22     DONE    DONE       DONE      10/03/22   10/03/22   06/02/22   05/17/22   8,9,16                   100,000       100,000  JLB             0           0           0 Bernier Carr Associates                 0      02/24/23                       10/03/22           
  -       Reconstruction               0-001-037                                              /  /       /  /     11/09/23     /  /     2,9                            0             0  JJH             0           0           0                                         0        /  /                           /  /             

          Elementary School K-4:
19-0877   Reconstruction               0-015-010  01/28/20     DONE    DONE       DONE      11/27/19   11/18/19   03/27/19   05/17/16   7,8,16                    84,000        84,000  JSS             0           0           0 Clark Patterson Lee                     0      09/10/20                       11/18/19           
20-0568   Reconstruction               0-015-011  01/28/21     DONE    DONE       DONE      10/09/20   09/29/20   03/09/20   06/09/20   8                        100,000       100,000  JSS             0           0           0 Bernier Carr Associates                 0      06/17/21                       09/29/20           
20-1320   Reconstruction               0-015-012  05/19/21     DONE    DONE       DONE      02/19/21   02/09/21   10/15/20   05/17/16   8,9,155,16               970,000       970,000  JLB             0           0           0 Bernier Carr Associates                 0      02/21/22                       02/09/21           
21-0957   Reconstruction               0-015-013  05/23/22     DONE    DONE       DONE      12/27/21   12/23/21   03/15/21   02/09/21   4,8,9,155,15,16        1,080,000     1,080,000  JLB             0           0           0 Bernier Carr Associates                 0        /  /                         12/23/21           

          Bus Garage (new 2016):
  -       Reconstruction               5-024-002                                              /  /       /  /     06/25/19     /  /     2,7                            0             0  BMJ             0           0           0                                         0        /  /                           /  /             

          Salt Shed:
  -    PR New Construction             7-025-001                                              /  /       /  /     04/04/22     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /     10/07/20     /  /     16                             0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED

GALWAY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-07-01-04
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Galway K-12 Facility:
  -    PR Additions and Alterations    0-002-023                                              /  /       /  /     02/14/19     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             
20-1335   Reconstruction               0-002-024  03/09/21     DONE    DONE       DONE      02/09/21   02/09/21   01/05/21   05/05/20   7                        100,000             0  JSS             0           0           0 Collins & Scoville Architects           0      06/30/21                       02/09/21           
21-0872   Reconstruction               0-002-025  01/13/22     DONE    DONE       DONE      12/08/21   12/08/21   07/21/21   05/18/21   9,15                     100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         12/08/21           
21-1126   Reconstruction               0-002-026  07/11/22     DONE    DONE       DONE      01/14/22   01/12/22   07/21/21   05/18/21   2,9,15                   420,000       420,000  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         01/12/22           
21-1427   Reconstruction               0-002-027  03/17/22     DONE    DONE       DONE      03/03/22   03/02/22   02/22/22   12/16/21   155                       70,000        70,000  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         03/02/22           
21-1708   Reconstruction               0-002-028  09/01/22     DONE    DONE       DONE      04/27/22   04/26/22   03/02/22   12/16/21   8,9                      600,000       600,000  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         04/26/22           
22-0544FC Reconstruction               0-002-029  12/06/22     DONE    DONE       DONE      09/21/22   09/20/22   08/26/22   08/04/22   2,9,10,15,16             704,275       704,275  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         09/20/22           
22-1451   Reconstruction               0-002-030  02/21/23     DONE    DONE       DONE      01/09/23   01/06/23   11/29/22   05/17/22   2,8                      100,000       100,000  JJH             0           0           0 Collins & Scoville Architects           0        /  /                         01/06/23           
  -       Reconstruction               0-002-031                                              /  /       /  /     02/24/23     /  /     2,4,7,8,9,155,15,16            0             0  JJH             0           0           0                                         0        /  /                           /  /             
23-1297   Reconstruction               0-002-032                         UNREVIEWED         12/28/23   12/26/23   11/20/23   05/16/23   16                             0             0  JJH             0           0           0 Collins & Scoville Architects           0        /  /                         12/26/23           

          XXTent 1 - Cancelled:
20-0372XX New Construction             0-014-001                         CANCELLED          09/14/20   09/14/20   09/02/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                         09/14/20           

          XXTent 2 - Cancelled:
20-0373XX New Construction             0-015-001                         CANCELLED          09/14/20   09/14/20   09/02/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                         09/14/20           

          XXTent 3 - Canceled:
20-0374XX New Construction             0-016-001                         CANCELLED          09/14/20   09/14/20   09/02/20     /  /     02 - 16                        0             0  JLB             0           0           0                                         0        /  /                         09/14/20           

          XXTent 4 - Canceled:
20-0375XX New Construction             0-017-001                         CANCELLED          09/14/20   09/14/20   09/02/20     /  /     02 - 16                        0             0  JSS             0           0           0                                         0        /  /                         09/14/20           

          Storage Building Demolition:
21-1939DB Discovered Building          2-007-002  06/08/22     DONE    DONE       DONE      06/08/22   06/08/22   04/11/22     /  /     7,8,9                          0             0  JLB             0           0           0                                         0        /  /                         06/08/22           

          Storage Building (2):
21-1127   New Construction             2-021-001  07/11/22     DONE    DONE       DONE      01/14/22   01/12/22   07/21/21   05/18/21   02 - 16                  165,000             0  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         01/12/22           

          Storage Building demolition:
  -    DB Discovered Building          2-026-001                                              /  /       /  /     04/17/22     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Bus Maint/Storage Facility:
21-1128   Reconstruction               5-008-005  07/11/22     DONE    DONE       DONE      01/14/22   01/12/22   07/21/21   05/18/21   2,9,10                 1,914,000     1,914,000  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         01/12/22           

          Pavilion with Toilet Room & Storage:
21-1129   New Construction             7-022-001  07/11/22     DONE    DONE       DONE      01/14/22   01/12/22   07/21/21   05/18/21   02 - 16                  601,000             0  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         01/12/22           

          Storage for Furniture:
  -    TQ Temporary Quarters           8-018-001                                              /  /       /  /     11/10/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             

          Storage for Furniture (2):
  -    TQ Temporary Quarters           8-019-001                                              /  /       /  /     12/07/20     /  /                                    0             0  JSS             0           0           0                                         0        /  /                           /  /             

          XXGraduation Tent:
20-1878TQ Temporary Quarters           8-020-001  06/14/21     DONE    DONE       DONE      06/14/21   06/14/21   06/03/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                         06/14/21           

          Homecoming Tent 1:
21-0425TQ Temporary Quarters           8-023-001               DONE    ADD. REQ'D DONE      09/24/21   09/24/21   09/23/21     /  /                                    0             0  FMJ             0           0           0                                         0        /  /                         09/24/21           

          Homecoming Tent 2:
21-0426TQ Temporary Quarters           8-024-001               DONE    ADD. REQ'D DONE      09/24/21   09/24/21   09/23/21     /  /                                    0             0  FMJ             0           0           0                                         0        /  /                         09/24/21           

          Graduation Tent:
  -    TQ Temporary Quarters           8-025-001                                              /  /       /  /       /  /       /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             
21-1762TQ Temporary Quarters           8-025-001  10/03/22     DONE    DONE       DONE      05/04/22     /  /       /  /       /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED

MECHANICVILLE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-12-00-05
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School/High School:
18-1725XX Additions and Alterations    0-006-017  11/06/19               CANCELLED          03/27/19   03/21/19   09/28/16   12/10/15   02 - 16                2,294,000             0  MTM             0           0           0 Bonacci Architects                      0        /  /                         03/21/19           
21-0981   Reconstruction               0-006-019  03/21/22     DONE    DONE       DONE      12/27/21   12/27/21   11/19/21   05/18/21   7                        556,261       556,261  JLB             0           0           0 Collins & Scoville Architects           0      12/22/22                       12/27/21           
22-2146   Reconstruction               0-006-020  09/11/23     DONE    DONE       DONE      05/05/23   05/04/23   02/27/23   12/10/15   2,9,16                 6,454,048     6,454,048  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         05/04/23           

          Elementary School:
  -       Reconstruction               0-010-005                                              /  /       /  /     07/02/19     /  /     2,4,7,8,9,10,155,15,           0             0  JLB             0           0           0                                         0        /  /                           /  /             
22-2147   Reconstruction               0-010-006  09/11/23     DONE    DONE       DONE      05/05/23   05/04/23   02/27/23   12/10/15   2,7,8,9,10,155,15,16     940,338       940,338  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         05/04/23           
23-0320   Reconstruction               0-010-007                         UNREVIEWED         08/24/23   08/09/23   08/11/23   05/16/23   2,9,16                 2,400,000             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         08/09/23           

          Bus Garage:
22-2148   Reconstruction               5-005-004  07/24/23     DONE    DONE       DONE      05/05/23   05/04/23   02/27/23   12/10/15   2,4,7,8,9,10,13,155,     325,962       325,962  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         05/04/23           

          District-Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /     06/03/19     /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
18-2044SB Reconstruction               7-999-001               DONE                           /  /       /  /     06/03/19     /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Graduation Tent:
  -    XX Reconstruction               8-016-001                         CANCELLED            /  /       /  /     05/06/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             

          Tent @ Jr/Sr High:
  -    TQ Temporary Quarters           8-017-001                                              /  /       /  /     09/23/21     /  /                                    0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED

BALLSTON SPA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-13-01-06
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Ballston Ave. Complex (HS/MS):
18-2000   Reconstruction               0-001-032  10/25/19     DONE    DONE       DONE      05/23/19   05/15/19   10/24/18   10/16/18   155,16                 4,907,000     4,907,000  JSS             0           0           0 Energy Concepts Engineering,P           0      02/18/21                       05/15/19           
19-0066   Reconstruction               0-001-033  09/25/19     DONE    DONE       DONE      07/12/19   07/02/19   10/24/18   10/16/18   2,4,7,8,9,10,13,155,  10,765,000    10,765,000  JSS             0           0           0 Collins & Scoville Architects           0      12/01/22                       07/02/19           
20-1469   Reconstruction               0-001-034  05/04/21     DONE    DONE       DONE      03/23/21   03/18/21   02/24/20   06/09/20   2,13,16                  100,000       100,000  JSS             0           0           0 Collins & Scoville Architects           0      03/23/22                       03/18/21           
21-0258   Reconstruction               0-001-035  12/14/21     DONE    DONE       DONE      09/01/21   08/30/21   04/27/21   05/18/21   10                       100,000             0  FMJ             0           0           0 Collins & Scoville Architects           0        /  /                         08/30/21           
21-1640   Reconstruction               0-001-036  05/13/22     DONE    DONE       DONE      04/11/22   04/06/22   02/22/22   10/16/18   2,8,9                  1,400,000     1,400,000  SLC             0           0           0 Collins & Scoville Architects           0      10/20/23                       04/06/22           
22-1437FA Reconstruction               0-001-037  02/26/23     DONE    DONE       DONE      01/09/23   11/14/22   03/31/22   11/02/22   155,16                   446,292             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/14/22           
22-1937   Reconstruction               0-001-038  05/04/23     DONE    DONE       DONE      03/27/23   03/24/23   12/01/22   05/17/22   9,155,16                 100,000       100,000  JLB             0           0           0 Collins & Scoville Architects           0        /  /                         03/24/23           

          Malta Avenue School:
19-0067   Reconstruction               0-002-024  09/25/19     DONE    DONE       DONE      07/12/19   07/02/19   03/21/18   10/16/18   2,4,7,8,9,155,15,16    7,940,000     7,940,000  JSS             0           0           0 Collins & Scoville Architects           0      12/01/22                       07/02/19           
  -       Reconstruction               0-002-025                                              /  /       /  /     12/10/21     /  /     155,16                         0             0  SLC             0           0           0                                         0        /  /                           /  /             

          Wood Rd Complex (Prim. Middle):
18-0804   Reconstruction               0-006-023  01/30/19     DONE    DONE       DONE      11/09/18   10/16/18   03/21/18   05/15/18   2,4,7,8,9,155,15,16      100,000       100,000  BMJ             0           0           0 Collins & Scoville Architects           0      06/22/20                       10/16/18           
  -    PR Additions and Alterations    0-006-024                                              /  /       /  /     05/01/19     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             
18-2194   Additions and Alterations    0-006-024  07/03/19     DONE    DONE       DONE      06/24/19   06/21/19   05/01/19   05/21/19   02 - 16                  100,000       100,000  BMJ             0           0           0 Collins & Scoville Architects           0      06/22/20                       06/21/19           

          Gordon Creek ES:
22-1438FC Reconstruction               0-024-002  03/05/23     DONE    DONE       DONE      01/09/23   11/14/22   12/10/21   11/02/22   155,16                   639,461             0  SLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/14/22           

          Field Storage Building:
19-0068   New Construction             2-027-001  09/25/19     DONE    DONE       DONE      07/12/19   07/02/19   10/26/18   10/16/18   02 - 16                  368,000             0  MTM             0           0           0 Collins & Scoville Architects           0      09/16/20                       07/02/19           

          District Wide:
  -    SB Reconstruction               7-999-BA1               DONE                           /  /       /  /       /  /       /  /     16                             0             0  JLB             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED

SOUTH GLENS FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-14-01-04
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School:
20-0074   Reconstruction               0-001-022  10/20/20     DONE    DONE       DONE      07/20/20   07/01/20   03/09/20   12/08/15   2,9,16                 1,149,200             0  JSS             0           0           0 Collins & Scoville Architects           0      08/26/21                       07/01/20           
21-1578   Reconstruction               0-001-023  06/08/22     DONE    DONE       DONE      03/30/22   03/28/22   02/22/22   05/18/21   8                        100,000       100,000  FMJ             0           0           0 Collins & Scoville Architects           0      06/30/22                       03/28/22           
22-1981   Reconstruction               0-001-024  09/20/23     DONE    DONE       DONE      04/03/23   03/30/23   07/20/22   05/17/22   2,4,9,155,15,16        6,172,000     5,130,940  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/30/23           
  -       Reconstruction               0-001-025                                              /  /       /  /     07/20/22     /  /     2,4,9,155,15,16                0             0  WLC             0           0           0                                         0        /  /                           /  /             
  -       Reconstruction               0-001-026                                              /  /       /  /     05/19/23     /  /     2                              0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Harrison Elementary School:
20-0075   Reconstruction               0-002-013  10/20/20     DONE    DONE       DONE      07/20/20   07/01/20   03/09/20   12/08/15   2,9                      491,500             0  JSS             0           0           0 Collins & Scoville Architects           0      08/26/21                       07/01/20           
  -       Reconstruction               0-002-014                                              /  /       /  /     07/20/22     /  /     2,4,9,155,15,16                0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Moreau Elementary School:
20-0076   Reconstruction               0-003-016  10/20/20     DONE    DONE       DONE      07/20/20   07/01/20   03/09/20   12/08/15   2,9                      658,600             0  JSS             0           0           0 Collins & Scoville Architects           0      08/26/21                       07/01/20           
  -       Reconstruction               0-003-017                                              /  /       /  /     07/20/22     /  /     2,4,9,155,15,16                0             0  WLC             0           0           0                                         0        /  /                           /  /             
23-0056   Reconstruction               0-003-018               DONE    ADD. REQ'D DONE      07/12/23   07/10/23   04/26/23   05/16/23   8,9,155,15,16            100,000             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         07/10/23           
  -       Reconstruction               0-003-019                                              /  /       /  /     04/26/23     /  /     8,9,155,15,16                  0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Oliver W. Winch Middle School:
17-1932   Reconstruction               0-007-011  01/11/19     DONE    DONE       DONE      06/05/18   06/05/18   06/08/15   12/08/15   2,8,9,10,155,15,16     4,500,000     4,500,000  BMJ             0           0           0 Collins & Scoville Architects           0      09/01/20                       06/05/18           
22-1803   Reconstruction               0-007-013  10/25/23     DONE    DONE       DONE      03/08/23   03/07/23   07/20/22   05/17/22   2,4,8,9,10,155,15,16  12,418,000    12,418,000  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/07/23           

          Tanglewood Elementary School:
19-0209   Reconstruction               0-008-011  08/27/19     DONE    DONE       DONE      08/05/19   08/02/19   07/23/19   12/08/15   15                       182,000       182,000  JSS             0           0           0 Collins & Scoville Architects           0      11/12/19                       08/02/19           
20-0077   Reconstruction               0-008-012  10/20/20     DONE    DONE       DONE      07/20/20   07/01/20   03/09/20   12/08/15   2,9                      425,300             0  JSS             0           0           0 Collins & Scoville Architects           0      08/26/21                       07/01/20           
22-0920   Reconstruction               0-008-013  03/09/23     DONE    DONE       DONE      11/07/22   11/03/22   07/20/22   05/17/22   2,9,16                 6,300,800     3,093,825  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/03/22           
  -       Reconstruction               0-008-014                                              /  /       /  /     07/20/22     /  /     2,4,7,8,9,155,15,16            0    15,652,479  WLC             0           0           0                                         0        /  /                           /  /             
22-2205   Reconstruction               0-008-015  11/09/23     DONE    DONE       DONE      05/15/23   05/12/23   04/26/23   05/17/22   8                        100,000       100,000  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         05/12/23           

          Ballard Elementary School:
20-0078   Reconstruction               0-009-009  10/20/20     DONE    DONE       DONE      07/20/20   07/01/20   03/09/20   12/08/15   2,9,155,16               496,500             0  JSS             0           0           0 Collins & Scoville Architects           0      08/26/21                       07/01/20           
  -       Reconstruction               0-009-010                                              /  /       /  /     07/20/22     /  /     2,4,7,8,9,155,15,16            0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Utility Storage Bldg-Kindness Closet:
  -    PR New Construction             2-019-001               DONE                           /  /       /  /     04/19/19     /  /     02 - 16                        0             0  BMJ             0           0           0                                         0        /  /                           /  /             
19-0005   New Construction             2-019-001  07/11/19     DONE    DONE       DONE      07/01/19   06/24/19   04/19/19   04/30/19   02 - 16                   85,000             0  BMJ             0           0           0 Collins & Scoville Architects           0      11/21/19                       06/24/19           

          Storage Building-Track:
  -    PR New Construction             2-020-001                                              /  /       /  /     07/20/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-0921   New Construction             2-020-001  03/09/23     DONE    DONE       DONE      11/07/22   11/03/22   07/20/22   05/17/22   02 - 16                  144,700             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/03/22           

          Stadium Storage Building:
  -    PR New Construction             2-021-001                                              /  /       /  /     08/26/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          Concession Stand:
22-1982   Reconstruction               7-013-003  09/20/23     DONE    DONE       DONE      04/03/23   03/30/23   08/26/22   05/17/22   4,7,8,16                 108,500             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/30/23           

          Concession Building- Stadium:
  -    PR New Construction             7-019-001                                              /  /       /  /     07/20/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-1983   New Construction             7-019-001  09/20/23     DONE    DONE       DONE      04/03/23   03/30/23   07/20/22   05/17/22   02 - 16                1,701,500             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/30/23           

          Dugout BB1:
  -    PR New Construction             7-022-001                                              /  /       /  /     09/09/22     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-0922   New Construction             7-022-001  03/09/23     DONE    DONE       DONE      11/07/22   11/03/22   09/09/22   05/17/22   02 - 16                   62,500             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/03/22           

          Dugout BB2:
  -    PR New Construction             7-023-001                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-0923   New Construction             7-023-001  03/09/23     DONE    DONE       DONE      11/07/22   11/03/22     /  /     05/17/22   02 - 16                   62,500             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         11/03/22           

          Press Box:
  -    PR New Construction             7-024-001                                              /  /       /  /     03/13/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             
22-1984   New Construction             7-024-001  09/20/23     DONE    DONE       DONE      04/03/23   03/30/23   03/13/23   05/17/22   02 - 16                  164,000             0  WLC             0           0           0 Collins & Scoville Architects           0        /  /                         03/30/23           

          Restroom Building:
  -    PR New Construction             7-025-001                                              /  /       /  /     08/17/23     /  /     02 - 16                        0             0  WLC             0           0           0                                         0        /  /                           /  /             

          District-Wide:
  -       Reconstruction               7-999-004                                              /  /       /  /     11/07/19     /  /     8                              0             0  JSS             0           0           0                                         0        /  /                           /  /             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED

SCHUYLERVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 52-17-01-04
last updated on 01/12/24
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER            ENERGY PERF      SUBS. COMPL.     PARTIAL       FINAL       CERTIFICATE OF
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM                          CONTRACT         DATE                 CSC REC'D   APPORTIONMENT
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sr High Sch (formerly Jr/Sr HS