Change Order Status - Westchester


KATONAH-LEWISBORO UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-01-01-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          John Jay High School (Bldg A):
95-1596   Additions and Alterations    0-001-004  06/28/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,382                  04/30/02   05/02/02    All Phase Elec.                     
                                                            00001          66,195                  04/30/02   05/02/02    Landscape Unlimited                 
                                                            00002          10,151                  04/30/02   05/02/02    All-Phase Elec.                     
                                                            00004           1,375                  04/30/02   05/02/02    Landscape Unlimited                 
                                                            00005           2,703                  04/30/02   05/02/02    All Phase Elec.                     
 
96-0059   Additions and Alterations    0-001-005  08/23/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003          -1,285                  04/30/02   05/03/02    Irv Schroder & Sons                 
                                                            00005          -1,875                  04/30/02   05/03/02    Wayne Const.                        
                                                            00005             830                  04/30/02   05/03/02    Katonah Roofing                     
                                                            00005           3,020                  06/06/02   07/02/02    All Phase Elec.                     
                                                            00005           3,762                  06/06/02   07/02/02    Irv Schroder & Sons                 
                                                            00005           7,417                  06/06/02   07/02/02    Tri-State Const.                    
                                                            00007           2,165                  04/30/02   05/03/02    Irv Schroder                        
                                                            00007           9,900                  04/30/02   05/03/02    Katonah Roofing                     
                                                            00008           3,500                  04/30/02   07/02/02    Tri-State Const.                    
                                                            00011          -4,550                  06/06/02   07/02/02    Frank & Lindy Plumbing              
                                                            00012           2,182                  04/30/02   05/03/02    DP Wolff                            
                                                            00012          11,505                  06/06/02   07/02/02    Etre Assoc.                         
                                                            00014           6,243                  04/30/02   07/02/02    Etre Assoc.                         
                                                            00025           7,613                  04/30/02   05/03/02    All-Phase Elec.                     
                                                            00027           3,546                  06/06/02   07/02/02    All Phase Elec.                     
                                                            00028           1,871                  04/30/02   05/03/02    All-Phase Elec.                     
                                                            00029           7,164                  04/30/02   05/03/02    All-Phase Elec.                     
                                                            00029          -9,766                  04/30/02   07/02/02    Wayne Const.                        
                                                            00031          14,750                  04/30/02   05/03/02    Wayne Const.                        
 
99-1471   Reconstruction               0-001-006  05/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0084   Reconstruction               0-001-007  08/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
02-1765   Additions and Alterations    0-001-008  02/24/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001           6,600                  01/14/05   02/08/05    Villa Construction                  
                                                            00001          -1,640                  02/07/05   03/14/05    Construction Services               
                                                            00001          10,000                  03/29/05   04/18/05    Industrial Window                   
                                                            00001         -15,605                  03/29/05   04/18/05    Irv schroder and Son                
                                                            00001         -15,000                  04/29/05   06/10/05    LJ Coppola Inc                      
                                                            00001           2,904                  12/23/05   04/24/06    Naber Electric                      
                                                            00001             979                  01/24/06   05/24/06    BENEWAY INC.                        
                                                            00001          90,000                  03/29/05   04/19/05    Shawn's Lawns                       
                                                            00002           1,926                  03/29/05   04/18/05    LJ Coppola Inc                      
                                                            00002           3,368                  06/17/05   07/12/05    Villa Construction                  
                                                            00002           1,944                  07/12/05   07/22/05    Construction Services               
                                                            00002             820                  12/12/05   06/26/06    Irv Schroder and Sons               
                                                            00002             800                  03/07/06   06/09/06    Naber Electric                      
                                                            00002          10,994                  03/06/06   06/09/06    Beneway Inc                         
                                                            00002           1,632                  07/13/06   08/08/06    Industrial Window                   
                                                            00003          -1,079                  06/17/05   07/12/05    Villa Construction                  
                                                            00003             739                  12/23/05   12/28/05    Construction Service                
                                                            00003           5,882                  03/06/06   06/09/06    Naber Electric                      
                                                            00003           3,691                  04/12/06   06/26/06    Irv Schroder and Sons               
                                                            00003           9,000                  04/13/06   06/26/06    LJ Coppola Inc                      
                                                            00003            -743                  05/25/06   07/31/06    Shawns Lawn                         
                                                            00003             965                  04/12/06   06/26/06    Industrial Window                   
                                                            00004             872                  06/17/05   07/12/05    Villa Construction                  
                                                            00004           1,288                  08/02/05   08/16/05    LJ Coppola Inc                      
                                                            00004           1,048                  12/23/05   05/24/06    Construction Service                
                                                            00004             768                  03/07/06   06/09/06    Naber Electric                      
                                                            00004           4,322                  03/06/06   06/30/06    Industrial Window                   
                                                            00004             366                  10/12/06   01/09/07    Beneway Inc                         
                                                            00004           1,067                  03/23/07   04/03/07    Shawns Lawns                        
                                                            00004             570                  05/25/06   07/31/06    Irv Schroder and Sons               
                                                            00005           1,541                  12/23/05   12/28/05    Construction Service                
                                                            00005          13,649                  04/11/06   06/26/06    Villa Construction                  
                                                            00005           1,735                  04/12/06   06/30/06    Naber electric                      
                                                            00005           2,626                  07/13/06   08/08/06    Industrial Window                   
                                                            00005             405                  10/04/06   01/09/07    Beneway inc                         
                                                            00005           3,330                  03/12/07   04/03/07    shawns Lawn                         
                                                            00006           2,505                  11/30/05   05/25/06    LJ Coppola Inc                      
                                                            00006           1,340                  03/07/06     /  /      Naber Electric                      
                                                            00006           1,340                  04/07/06   06/09/06    Naber Electric                      
                                                            00006          -7,500                  10/19/06   12/14/06    Villa Construction                  
                                                            00006             869                  03/23/07   04/03/07    Shawns Lawn                         
                                                            00007           3,166                  11/30/05   04/21/08    Construction                        
                                                            00007             982                  04/12/06   06/26/06    LJ Coppola Inc                      
                                                            00007             370                  05/25/06   07/20/06    Naber Electric                      
                                                            00007           1,604                  03/23/07   04/03/07    shawns Lawn                         
                                                            00008           1,944                  12/23/05   05/24/06    Construction Service                
                                                            00008           4,900                  03/06/06   06/09/06    Naber Electric                      
                                                            00008             744                  04/12/06   06/26/06    LJ Coppola Inc                      
                                                            00008           8,353                  03/23/07   04/03/07    shawns Lawn                         
                                                            00009           4,189                  04/12/06   06/30/06    Naber Electric                      
                                                            00009          -5,000                  05/25/06   07/20/06    LJ Coppola Inc                      
                                                            00009           3,620                  03/23/07   04/03/07    shawns Lawn                         
                                                            00010           6,778                  02/02/06   06/30/06    Construction Services               
                                                            00010           1,233                  04/12/06   06/30/06    Naber Electric                      
                                                            00011           7,000                  01/24/06   05/24/06    CONSTRUCTION SERVICES LLC.          
                                                            00012           2,133                  10/04/06   10/24/06    Construction service                
                                                            00013          -3,600                  03/06/06   06/30/06    Construction Service                
                                                            00014           4,086                  04/12/06   06/26/06    Construction Service                
                                                            00015           2,457                  04/13/06   06/26/06    construction service                
                                                            00016           1,658                  04/11/06   06/26/06    Construction Service                
                                                            00017             743                  05/25/06   07/31/06    Construction Services               
                                                            00018          -2,200                  04/11/06   06/26/06    Construction Services               
                                                            0002           17,649                  06/01/05   07/21/05    Shawns Lawn                         
                                                            00020           4,256                  05/25/06   07/31/06    Construction Service                
                                                            00022           5,394                  10/12/06   04/21/08    Construction Service                
                                                            00023             837                  10/04/06   10/24/06    Construction                        
                                                            00024             771                  10/04/06   10/24/06    Construction Service                
                                                            00025           1,308                  10/04/06   10/24/06    Construction service                
                                                            00026           1,989                  10/04/06   10/24/06    Construction service                
                                                            00027           1,709                  10/04/06   10/24/06    Construction Services               
                                                            00029          10,000                  10/04/06   10/24/06    Construction service                
                                                            0009              499                  12/23/05   12/28/05    Construction Service                
 
08-1451   Reconstruction               0-001-011  05/28/09  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1856   Reconstruction               0-001-012  05/20/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,500                  03/29/10   01/23/12    SOUTHEAST MECHANICAL CORP           
 
08-1379   Reconstruction               0-001-013  05/18/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            23,171                  10/27/09   12/15/09    FILINGERI ELECTRICAL CONTRACTING    
 
09-1283   Additions and Alterations    0-001-014  07/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  08/30/11   09/23/11    LANDSCAPE UNLIMITED                 
                                                            001             4,722                  11/23/11   03/30/12    SOUTHEAST MECHANICAL CORPORATION    
                                                            002             3,960                  07/22/11   09/02/11    LANDSCAPE UNLIMITED                 
                                                            003            13,684                  08/03/11   09/02/11    LANDSCAPE UNLIMITED                 
                                                            004             4,147                  08/30/11   09/23/11    LANDSCAPE UNLIMITED                 
                                                            005             3,750                  08/30/11   09/23/11    LANDSCAPE UNLIMITED                 
                                                            006                 0                  08/30/11   09/23/11    LANDSCAPE UNLIMITED                 
                                                            007            14,300                  11/23/11   03/30/12    LANDSCAPE UNLIMITED                 
                                                            008             7,500                  11/23/11   03/30/12    LANDSCAPE UNLIMITED                 
                                                            009             9,750                  01/20/12   04/06/12    LANDSCAPE UNLIMITED                 
 
11-1413   Reconstruction               0-001-016  06/22/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-HS         26,300                  04/29/13   06/28/13    Suburban Restoration Co., Inc.      
 
13-0956   Reconstruction               0-001-017  04/09/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,674                  09/02/14   09/29/14    BBR Contracting Corp.               
                                                            002             4,680                  10/20/14   10/22/14    BBR Contracting Corp.               
 
09-1467   Reconstruction               0-001-018  07/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,180                  07/22/11   12/13/11    SOLAR LIBERTY ENERGY SYSTEMS INC    
 
12-0423   Reconstruction               0-001-019  11/28/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HS-001         26,580                  08/28/13   09/13/13    Milcon Construction Corporation     
 
13-1063   Reconstruction               0-001-020  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1608   Reconstruction               0-001-021  10/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002           143,900                  07/20/15   08/05/15    Landscape Unlimited                 
                                                            1              37,500                  06/29/15   07/17/15    Landcape Unlimited, Inc.            
 
14-1639   Reconstruction               0-001-022  02/19/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0178   Reconstruction               0-001-023  04/25/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0566   Reconstruction               0-001-024  11/26/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1518   Reconstruction               0-001-025  06/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1400FP Reconstruction               0-001-FP1  05/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lewisboro ES (closed 8/31/14):
96-0242   Additions and Alterations    0-002-005  12/09/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,200                  04/30/02   05/02/02    West Mech.                          
                                                            00002           1,350                  04/30/02   08/15/02    FA Burchetta Co.                    
                                                            00003             550                  04/30/02   05/02/02    Delcon Assoc.                       
                                                            00003          18,929                  04/30/02   05/02/02    West Mech.                          
                                                            00004           3,311                  06/06/02   08/15/02    West Mech.                          
                                                            00008          -2,620                  04/30/02   05/02/02    J&M Heating                         
                                                            00010           4,000                  06/06/02   07/23/02    J&M Heating                         
                                                            00012          27,000                  06/06/02   07/23/02    Delcon Assoc.                       
 
02-1495   Reconstruction               0-002-007  09/16/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           4,675                  12/23/05   05/24/06    Villa Construction                  
                                                            00001           1,936                  04/15/05   04/26/05    Hammond Electrical Contracting Corp 
                                                            00001           2,200                  06/17/05   07/12/05    Barrett Roofing and Supply Co.      
                                                            00001          -2,200                  06/17/05   07/12/05    WDF Inc.                            
                                                            00002          -2,850                  12/23/05   06/26/06    WDF Inc                             
                                                            00002           4,651                  06/09/05   07/20/05    Hammond Electrical Contracting Corp.
                                                            00002         100,000                  04/10/08     /  /      Shawn's Lawns,Inc.                  
                                                            00002         100,000                  04/10/08   06/20/08    SHAWN'S LAWNS, INC.                 
                                                            00003           1,584                  06/22/05   07/11/05    Hammond Electrical Contracting      
                                                            00003           1,114                  06/28/05   07/19/05    Summit Construction                 
                                                            00003           7,568                  03/06/06   06/09/06    WDF Inc                             
                                                            00003             650                  04/13/06   06/26/06    Barrett roofing and Supply          
                                                            00003          -1,800                  02/02/06   04/25/06    Shawn's Lawns, Inc                  
                                                            00003           7,827                  12/12/06   01/30/07    Beneway Ic                          
                                                            00004         -11,111                  04/12/06   04/21/08    Beneway Inc                         
                                                            00004          -2,800                  04/12/06   04/21/08    HammonD Electrical Contracting      
                                                            00004          -4,430                  04/12/06   04/21/08    WDF Inc                             
                                                            00004           1,472                  12/12/06   01/30/07    Summit construction                 
                                                            00004           1,650                  04/10/08   04/21/08    Barrett Roofing and Supply Co.      
                                                            00005           2,850                  12/28/05   08/08/06    Summit Construction Service         
                                                            00005           9,656                  04/13/06   06/26/06    Beneway inc                         
                                                            00005           8,490                  01/24/06   07/24/06    Barrett Roofing and Supply          
                                                            00006             736                  08/02/05   08/16/05    summit Construction Service         
                                                            00006           1,800                  12/28/05   04/21/06    Hammond Electrical Contracting      
                                                            00007           1,350                  06/06/00   06/23/06    Hammond Electrical Contracting      
                                                            00007          -8,000                  04/12/06   06/26/06    SUMMIT CONSTRUCTION SERVICES        
                                                            00008           1,876                  03/06/06   06/09/06    Hammond Electric                    
                                                            00008             830                  03/23/07   04/03/07    Summit Construction                 
                                                            00009          26,319                  09/29/05   04/21/08    Summit Construction Service         
                                                            00010           5,749                  01/24/06   07/24/06    Summit Construction                 
                                                            00011           3,681                  12/28/05   08/08/06    Summit Construction                 
                                                            00012           6,613                  05/25/06   07/31/06    Summit Construction Service         
                                                            00017          15,522                  12/12/05   06/26/06    Summit Construction Service         
                                                            00018             894                  12/23/05   05/05/06    Summit Construction                 
                                                            00019          -6,792                  01/14/06   07/24/06    Summit Construction Services Group  
                                                            00021          22,710                  07/17/07   08/20/07    Summit Construction                 
 
04-0552   Reconstruction               0-002-008  03/18/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1109   Reconstruction               0-002-009  05/02/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -7,000                  09/25/07   01/15/08    BETTER WATER WELL SYSTMENS          
                                                            002             7,985                  09/25/07   01/15/08    BETTER WATER WELL SYSTEMS           
                                                            004               780                  01/23/08   03/19/08    Better Water Well Systems           
                                                            3               3,894                  09/25/07   01/15/08    BETTER WATER WELLS                  
 
07-2102   Additions and Alterations    0-002-010  05/14/08  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1064   Reconstruction               0-002-012  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Katonah Elementary:
96-0580   Additions and Alterations    0-003-004  03/07/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -1,839                  04/30/02   07/23/02    Katonah Roofing                     
                                                            00002           6,600                  04/30/02   05/03/02    Suburban Restoration                
                                                            00002           3,500                  06/06/02   07/23/02    West Mech. Corp.                    
                                                            00003           2,500                  04/30/02   07/23/02    Nanmar Const.                       
                                                            00003           2,400                  04/30/02   05/03/02    Suburban Restoration                
                                                            00004           4,265                  04/30/02   05/03/02    Damiano Ent.                        
                                                            00004           1,900                  04/30/02   05/03/02    Mengler Contracting                 
                                                            00005           1,890                  04/30/02   05/03/02    Mengler Contracting                 
                                                            00006             972                  04/30/02   05/03/02    Mengler Contracting                 
                                                            00006           4,462                  04/30/02   07/23/02    Etre Assoc.                         
                                                            00007           3,527                  04/30/02   05/03/02    Mengler Contracting                 
                                                            00009           4,000                  04/30/02   05/03/02    Damiano Ent.                        
                                                            00010           3,500                  06/06/02   07/23/02    Damiano Ent.                        
                                                            00011           2,071                  04/30/02   05/03/02    Herbert Martin                      
                                                            00012           1,873                  04/30/02   05/03/02    Herbert Martin                      
                                                            00016         -15,000                  04/30/02   07/23/02    Damiano Ent.                        
 
02-0944   Reconstruction               0-003-007  05/28/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00001           1,644                  01/07/05   02/01/05    Frank Lindy                         
                                                            00001           1,084                  01/07/05   02/01/05    AP Rainaldi                         
                                                            00001          -1,644                  02/07/05   03/14/05    L simon                             
                                                            00001         -23,648                  03/29/05   04/15/05    Summit Construction                 
                                                            00001           3,006                  04/29/05   06/03/05    Naber Electric                      
                                                            00002             650                  01/07/05   02/01/05    Frank Lindy                         
                                                            00002           3,547                  02/07/05   03/14/05    Summit Construction                 
                                                            00002             342                  03/29/05   04/15/05    AP Rainaldi                         
                                                            00002           2,812                  03/29/05   04/15/05    Naber Electric                      
                                                            00003           1,141                  04/15/05   05/02/05    summit Construction                 
                                                            00003            -355                  04/29/05   06/21/05    Naber Electric                      
                                                            00004          -1,805                  04/29/05   06/21/05    Naber Electric                      
                                                            00005             870                  06/03/06   08/11/06    Summit Construction                 
                                                            00006             696                  03/06/06   06/12/06    Summit Construction                 
                                                            00007             885                  03/06/06   06/12/06    Summit Construction                 
                                                            00008           8,499                  05/25/06   06/15/06    Summit Construction                 
                                                            0003            1,038                  03/04/05   06/10/05    Frank Lindy                         
 
05-0612   Reconstruction               0-003-008  03/03/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1854   Reconstruction               0-003-009  05/12/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1414   Reconstruction               0-003-011  06/22/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-KES         2,900                  04/29/13   06/28/13    Suburban Restoration Co., Inc.      
 
12-0424   Reconstruction               0-003-012  11/28/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            KES-001        -5,542                  06/25/15   08/04/15    Dimitri Enterprises Inc             
 
13-1065   Reconstruction               0-003-014  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1021   Reconstruction               0-003-015  01/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0565   Reconstruction               0-003-016  02/05/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Increase Miller Elem.:
95-1625   Additions and Alterations    0-004-005  07/15/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002             505                  04/30/02   07/02/02    Villa Const.                        
                                                            00003           1,497                  04/30/02   07/02/02    DP Wolff                            
                                                            00006          -5,041                  04/30/02   07/02/02    Turso Const.                        
                                                            00007         -10,000                  04/30/02   05/03/02    Turso Const.                        
 
02-0945   Additions and Alterations    0-004-008  05/28/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -13,500                  02/07/05   03/14/05    Marquise Construction               
                                                            00001           1,500                  04/12/05   05/02/05    Beneway Inc                         
                                                            00001           3,575                  05/19/05   06/07/05    Anderson Electric                   
 
09-1020   Additions and Alterations    0-004-010  07/16/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -20,000                  12/30/13   03/04/14    L. J. Coppola, Inc.                 
 
08-1380   Reconstruction               0-004-011  05/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0490   Reconstruction               0-004-012  01/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            IMES-001        5,149                  12/30/13   01/17/14    Mengler Mechanical, Inc.            
                                                            IMES-02         6,709                  12/30/13   01/17/14    Mengler Mechanical, Inc.            
 
12-0425   Reconstruction               0-004-013  11/28/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            20,212                  07/15/13   07/19/13    WB Contracting Corp.                
                                                            002            14,945                  09/23/13   11/25/13    WB Contracting Corp.                
 
13-1066   Reconstruction               0-004-015  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1396   Reconstruction               0-004-016  08/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0634FA Reconstruction               0-004-019  11/09/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1398FP Reconstruction               0-004-FP1  05/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Jay Middle School:
95-1711   Reconstruction               0-005-002  08/20/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -7,450                  04/30/02   07/23/02    Dover Elevator                      
                                                            00001          12,763                  06/06/02   07/23/02    Irv Schroder & Sons                 
                                                            00002           5,209                  06/06/02   07/23/02    Tri-State Const.                    
                                                            00002          16,614                  06/06/02   07/23/02    Villa Const.                        
                                                            00003           1,230                  04/30/02   05/02/02    Villa Const.                        
                                                            00004           3,909                  04/30/02   07/23/02    Frank & Lindy Plumbing              
                                                            00004          16,356                  06/06/02   07/23/02    Etre Assoc.                         
                                                            00005           4,144                  04/30/02   05/02/02    Tuxedo Flooring                     
                                                            00006           5,143                  04/30/02   07/23/02    Ampul Elec.                         
                                                            00006             800                  04/30/02   05/02/02    Tuxedo Flooring                     
                                                            00006           2,653                  04/30/02   07/23/02    Harmonay Mech.                      
                                                            00007           2,269                  04/30/02   07/23/02    Ampul Elec.                         
                                                            00007           1,266                  04/30/02   05/02/02    Tuxedo Flooring                     
                                                            00007           1,447                  04/30/02   05/02/02    Harmonay Mech.                      
                                                            00008           3,791                  04/30/02   07/23/02    Ampul Elec.                         
                                                            00011           1,138                  04/30/02   05/02/02    Harmonay Mech.                      
                                                            00012           9,573                  04/30/02   07/23/02    Wayne Const.                        
                                                            00013           6,696                  04/30/02   05/02/02    Wayne Const.                        
                                                            00013             900                  04/30/02   05/02/02    Harmonay Mech.                      
                                                            00014           1,626                  04/30/02   08/15/02    Wayne Const.                        
                                                            00016           3,837                  04/30/02   05/02/02    Ampul Elec.                         
                                                            00024           1,170                  04/30/02   05/02/02    Ampul Elec.                         
                                                            00032           3,000                  04/30/02   05/02/02    Wayne Const.                        
 
00-0085   Reconstruction               0-005-004  08/24/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1766   Additions and Alterations    0-005-005  12/08/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00001         -20,100                  02/07/05   03/07/05    Schenectady Steel                   
                                                            00001           2,900                  02/07/05   03/14/05    Frank Lindy plumbing heating        
                                                            00001        -123,000                  04/12/05   04/26/05    Summit Construction Service         
                                                            00001           3,300                  06/17/05   07/12/05    Talt Electric                       
                                                            00001          -1,276                  04/11/06   06/26/06    Darcon Construction                 
                                                            00001          -6,800                  07/13/06   01/09/07    Precision Plumbing                  
                                                            000010           -530                  04/11/06   06/26/06    Schenectady Steel                   
                                                            00002         -12,000                  02/07/05   03/07/05    Schenectady Steel                   
                                                            00002           1,490                  03/04/05   03/24/05    Frank Lindy Plumbing                
                                                            00002           4,780                  03/29/05   04/18/05    Summit Construction Service Group   
                                                            00002           4,206                  12/23/05   04/24/06    Talt Electric                       
                                                            00002             955                  04/11/06   06/26/06    Darcon Construction                 
                                                            00002           3,400                  07/13/06   01/12/07    Precision Plumbing                  
                                                            00002             641                  01/24/06   07/24/06    Marquise Construction               
                                                            00003           5,452                  03/04/05   03/24/05    Frank Lindy Plumbing Heating        
                                                            00003           5,144                  03/29/05   04/18/05    Schenectady Steel                   
                                                            00003         -14,378                  12/23/05   12/29/05    Talt Electric                       
                                                            00003         -50,086                  07/13/06   01/12/07    Precision Plumbing                  
                                                            00003           2,268                  07/13/06   08/08/06    Darcon Construction                 
                                                            00003           1,241                  07/13/06   08/08/06    Marquise Construction               
                                                            00003         -13,000                  03/23/07   04/03/07    Summit Construction                 
                                                            00004           5,464                  03/29/05   04/18/05    Schenectady Steel                   
                                                            00004          15,205                  12/28/05   02/01/10    Frank Lindy Plumbing Heating        
                                                            00004           1,136                  03/06/06   06/30/06    Marquise Construction               
                                                            00004           1,065                  04/11/06   06/30/06    talt Electric                       
                                                            00004          -5,287                  07/13/06   01/12/07    Precision Plumbing                  
                                                            00004           4,500                  07/13/06   08/08/06    Darcon Construction                 
                                                            00004           3,104                  03/28/07   04/03/07    Summit Construction                 
                                                            00005           7,633                  03/29/05   04/18/05    Schenectady Steel                   
                                                            00005          -4,196                  08/02/05   08/16/05    Summit Construction Services        
                                                            00005           2,202                  04/13/06   06/26/06    Frank Lindy Plumbing Heating        
                                                            00005           1,428                  07/13/06   08/08/06    Marquise Construction               
                                                            00005          -2,500                  11/22/06   01/09/07    Darcon Construction                 
                                                            00006           1,301                  07/12/05   07/22/05    Schenectady Steel                   
                                                            00006          -7,986                  01/24/06   07/24/06    summit Construction                 
                                                            00007          -1,322                  07/12/05   07/22/05    Schenectady Steel                   
                                                            00007           2,414                  12/23/05   04/24/06    Frank Lindy Plumbing Heating        
                                                            00007         -13,000                  03/23/07   04/03/07    Summit Construction                 
                                                            00008           2,344                  07/12/05   07/22/05    Schenectady Steel                   
                                                            00008           2,849                  08/02/05   08/16/05    Summit Construction Service         
                                                            00008           5,157                  05/25/06   07/20/06    Frank Lindy Plumbing                
                                                            00009           1,401                  08/02/05   08/16/05    Summit Construction Services        
                                                            00011             291                  04/11/06   06/26/06    Schenectady Steel                   
                                                            00011           1,100                  03/23/07   04/03/07    Summit Construction                 
                                                            00012          27,290                  05/15/08   08/28/08    SUMMIT CONSTRUCTION SERVICES GROUP  
                                                            0009             -248                  12/23/05   05/24/06    Schenectady hardware                
                                                            13             50,000                  12/18/08   02/27/09    SUMMIT CONSTRUCTION SERVICES GROUP, 
 
07-1853   Reconstruction               0-005-007  05/16/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1113   Reconstruction               0-005-009  06/01/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -5,100                  12/16/09     /  /      ENERGY MANAGEMENT OF FACILITIES INC 
 
09-1468   Reconstruction               0-005-010  07/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             4,180                  08/15/11   12/14/11    SOLAR LIBERTY ENERGY SYSTEMS INC    
 
12-0426   Reconstruction               0-005-011  11/28/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             9,810                  09/23/13   11/25/13    AMB Construction, Inc.              
                                                            002            84,267                  09/23/13   11/25/13    AMB Construction, Inc.              
 
13-1067   Reconstruction               0-005-012  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2403   Reconstruction               0-005-015  10/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1401FP Reconstruction               0-005-FP1  05/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Meadow Pond Elementary:
96-0708   Additions and Alterations    0-007-004  02/18/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,000                  04/30/02   05/02/02    Empire Restoration                  
                                                            00002           1,375                  04/30/02   05/02/02    Landscape Unlimited                 
                                                            00002           3,299                  06/06/02   07/23/02    West Mech. Corp.                    
                                                            00005           1,800                  06/06/02   07/23/02    Diggins Mech.                       
                                                            00008           6,905                  06/06/02   07/23/02    Mezz Elec.                          
                                                            00013             315                  04/30/02   05/02/02    DAS Contracting North               
 
91-1400   Reconstruction               0-007-005  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0946   Additions and Alterations    0-007-006  05/28/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00001             842                  06/22/05   06/29/05    Hammond Electrical Contractors      
                                                            00001          14,698                  06/22/05   06/29/05    L simon Corp                        
                                                            00001            -224                  06/22/05   06/29/05    Precision Plumbing                  
                                                            00001          -3,242                  09/29/05   12/06/05    Summit Construction Service         
                                                            00002             754                  06/22/05   06/29/05    Hammond Electrical Contractors      
                                                            00002         -15,672                  06/22/05   06/29/05    L Simon Corp                        
                                                            00002         -13,839                  09/29/05   10/18/05    Summit Construction service         
                                                            00002             520                  09/29/05   10/18/05    Summit Construction                 
                                                            0001            4,110                  06/17/05   06/30/05    Summit Construction                 
 
07-1855   Reconstruction               0-007-007  05/12/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1021   Additions and Alterations    0-007-008  07/16/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,080                  09/02/14   09/05/14    Mengler Mechanical, Inc.            
                                                            002             5,038                  09/02/14   09/05/14    Mengler Mechanical, Inc.            
 
13-1397   Reconstruction               0-007-009  08/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0491   Reconstruction               0-007-011  01/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MPES-001        1,891                  12/27/13   01/17/14    Mengler Mechanical, Inc.            
                                                            MPES-002          516                  12/30/13   01/17/14    Mengler Mechanical, Inc.            
                                                            MPES-003       14,080                  09/02/14   09/05/14    Mengler Mechanical, Inc.            
 
13-1068   Reconstruction               0-007-012  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1298   Reconstruction               0-007-013  04/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,603                  10/18/16   10/20/16    WB Contracting Corp.                
                                                            002             3,758                  10/18/16   10/20/16    WB Contracting Corp.                
                                                            003             3,620                  10/18/16   10/20/16    WB Contracting Corp.                
                                                            004            -7,000                  10/18/16   10/20/16    WB Contracting Corp.                
 
17-0140   Reconstruction               0-007-014  10/12/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -15,002                  06/20/18   07/06/18    AMERICAN PETROLEUM EQUIPMENT & CONST
 
23-0635FA Reconstruction               0-007-018  11/09/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1399FP Reconstruction               0-007-FP1  05/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular Clsrms @ Meadow Ponds ES:
00-1884   New Construction             0-045-001  08/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,500                  12/20/02   12/20/02    James Ford Plumbing                 
                                                            2                 640                  08/23/02   09/04/02    Elec. Contracting                   
                                                            Elec 1         -4,000                  08/23/02   09/04/02    Mard Elec.                          
                                                            GC-01        -105,620                  08/23/02   11/06/02    Purcell Const.                      
                                                            GC-02           3,883                  08/23/02   09/04/02    Purcell Const.                      
                                                            GC-03           6,965                  08/23/02   09/04/02    Purcell Const.                      
 

          Administration Bldg:
10-0449   Reconstruction               1-033-002  10/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001              -500                  02/04/13   04/26/13    FOURMEN CONSTRUCTION INC            
 

          Admin Bldg Annex Demolition:
18-2171   Reconstruction               1-034-001  08/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular/Admin Demolition:
18-2170   Reconstruction               1-043-002  08/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field Storage Building:
95-1597   New Construction             2-041-001  06/28/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,113                  07/14/98   09/25/98    Frank & Lindy Plumbing              
 

          Maint. Shed @ John Jay HS:
02-1761   New Construction             3-048-001  04/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Storage/Transportation:
95-1598   New Construction             4-042-001  06/28/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,113                  07/14/98   09/25/98    Frank & Lindy Plumbing              
                                                            00002          53,970                  07/14/98   09/25/98    Frank & Lindy Plumbing              
                                                            00003         165,200                  04/30/02   05/02/02    Tri-State Const.                    
                                                            00006          40,000                  07/14/98   08/07/98    All Phase Elec.                     
 

          Utility Bldg. to house water tank:
03-1277   New Construction             7-049-001  04/21/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -3,375                  07/18/06   07/27/06    Melwood Contracting                 
                                                            001             2,329                  07/18/06   12/27/06    Solar Electric Systems              
 

          New Toilet Facility:
09-1284   New Construction             7-053-001  07/14/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wastewater Trtmt Plant @ Katonah ES:
15-0912   New Construction             7-054-001  06/21/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
07-2294   Reconstruction               7-999-001  09/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,737                  09/01/10   09/24/10    S3 INTEGRATION                      
 

BEDFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-01-02-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Pound Ridge Elementary:
91-1142   Reconstruction               0-001-003  04/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0138   Reconstruction               0-001-004  09/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1478   Reconstruction               0-001-005  05/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1680   Reconstruction               0-001-006  07/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1498   Reconstruction               0-001-007  09/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1531   Additions and Alterations    0-001-008  09/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001           8,119                  11/18/04   11/23/04    Melwood                             
                                                            00002           6,779                  11/18/04   12/06/04    Melwood                             
                                                            00002           1,200                  03/22/05   03/31/05    Dutchess Mechanical Inc             
                                                            00002           6,194                  05/31/05   07/20/05    Etre Associates                     
                                                            00003          -3,998                  12/07/04   12/10/04    Melwood                             
                                                            00003           1,195                  03/22/05   03/31/05    Dutchess Mechanical Inc             
                                                            00009           2,620                  03/22/05   03/31/05    Melwood                             
                                                            0001            5,277                  01/26/05   03/18/05    Dutchess Mechanical Inc             
                                                            00011          -8,584                  03/22/05   03/31/05    Andron Construction                 
                                                            00013           2,835                  05/31/05   07/21/05    Melwood                             
                                                            00016          -9,061                  09/19/05   09/29/05    Melwood                             
                                                            00017          -5,000                  09/19/05   09/29/05    Melwood                             
                                                            00018          16,912                  03/27/06   06/14/06    Melwood                             
                                                            00019           4,820                  11/25/05     /  /      Melwood                             
                                                            00020           7,905                  02/03/06   07/21/06    Melwood                             
                                                            00021          29,283                  03/27/06   05/09/06    Melwood                             
                                                            00022             734                  03/27/06   06/30/06    Melwood                             
                                                            00024           6,356                  03/27/06   06/26/06    Melwood                             
                                                            00025           6,666                  03/27/06   06/26/06    Melwood                             
                                                            00026             734                  03/27/06   06/14/06    melwood                             
                                                            00027             757                  04/13/06   06/26/06    Melwood                             
                                                            00028           2,680                  03/22/05   03/31/05    Andron Construction                 
                                                            00028          15,468                  04/13/06   06/26/06    Melwood                             
                                                            00029         -10,427                  05/25/06   06/23/06    Melwood                             
                                                            00030          18,500                  12/20/06   01/30/07    Melwood                             
                                                            00036           1,049                  02/04/05   03/14/05    Andron Construction                 
                                                            0004            8,306                  12/07/04   12/10/04    Melwood                             
                                                            00042           1,611                  03/22/05   03/31/05    Andron Construction                 
                                                            00044             739                  03/22/05   03/31/05    Andron Construction                 
                                                            00047           1,280                  03/22/05   03/31/05    Andron Construction                 
                                                            00048           1,192                  03/22/05   03/31/05    Andron Construction                 
                                                            00049           3,163                  03/22/05   03/31/05    Andron Construction                 
                                                            0005            8,350                  12/07/04   12/10/04    Melwood                             
                                                            00051           5,742                  03/22/05   03/31/05    Andron Construction                 
                                                            00053           5,267                  03/22/05   03/31/05    Andron Construction                 
                                                            00058          11,352                  05/05/05   07/20/05    Andron Construction Corp            
                                                            0006            2,835                  11/18/04   12/06/04    Infinity Environmental Service      
                                                            00065           6,635                  05/31/05   07/20/05    Andron Construction                 
                                                            0007           27,395                  11/18/04   12/06/04    Infinity Environmental Service      
                                                            0007            7,755                  05/31/05   07/21/05    Melwood                             
                                                            001             5,197                  09/27/04   12/24/04    Infinity Environmental Services     
                                                            001             2,891                  09/27/04   12/24/04    Filingeri Electrical Contracting    
                                                            001             3,609                  01/26/05   03/18/05    Frank Lindy Plumbing Heating        
                                                            001             4,471                  07/27/07   08/20/07    R and V Flooring systems            
                                                            002             6,850                  09/27/04   12/24/04    Infinity Environmental Service      
                                                            002           145,067                  07/01/05   07/19/05    Frank Lindy Plumbing heating        
                                                            003            19,248                  09/27/04   12/24/04    Infinity Environmental Service      
                                                            003             3,611                  05/31/05   07/21/05    Frank Lindy Plumbign heating        
                                                            003               292                  06/23/05   07/20/05    Etre Associates                     
                                                            004            23,934                  09/27/04   12/24/04    Infinity Environmental Service      
                                                            004               897                  05/31/05   07/21/05    Frank Lindy Plumbing heating        
                                                            004             1,850                  06/23/05   07/20/05    Dutchess mechanical                 
                                                            004            -9,185                  06/23/05   07/20/05    Etre Associates                     
                                                            005               970                  03/22/05   03/31/05    Filingeri Electrical Contracting    
                                                            005             1,955                  05/31/05   07/21/05    Frank Lindy Plumbing heating        
                                                            005             3,899                  08/01/05   08/15/05    Dutchess mechanical                 
                                                            005             2,449                  11/25/05     /  /      Etre Associates                     
                                                            006             2,675                  08/01/05   08/15/05    Dutchess Mechanical inc             
                                                            006             6,613                  10/06/05   10/13/05    Frank Lindy Plumbing Heatin g       
                                                            006            -1,264                  11/25/05   02/10/06    Etre Associates                     
                                                            007             2,910                  11/25/05   02/10/06    Frank Lindy Plumbing                
                                                            007           -27,742                  11/25/05   02/10/06    Etre Associates                     
                                                            007               723                  07/17/06   07/27/06    Dutchess Mechanical                 
                                                            008            11,912                  12/07/04   12/10/04    Infinity Environmental Service      
                                                            008               719                  05/31/05   07/20/05    Filingeri Electrical Contracting    
                                                            008               990                  11/25/05     /  /      Etre Associates                     
                                                            008            18,021                  12/23/05     /  /      Frank Lindy Plumbing                
                                                            009             2,095                  02/03/06   05/23/06    Frank Lindy Plumbing heating        
                                                            010            23,828                  09/19/05   09/29/05    Infinity Environmetnal Service      
                                                            010             1,872                  11/25/05     /  /      Filingeri Electrical Contracting    
                                                            010             1,200                  03/27/06   05/09/06    Frank lindy Plumbing Heating        
                                                            011             4,864                  08/16/05   08/31/05    Filingeri Electrical Contracting    
                                                            011             7,603                  09/28/05   10/13/05    Infinity Environmental Serives      
                                                            011             3,592                  03/27/06   06/14/06    Frank Lindy Plumbing Heating        
                                                            012             2,154                  08/23/05   09/02/05    Filingeri Electrical Contracting    
                                                            012             3,842                  09/27/05   10/13/05    Infinity Environmental              
                                                            012            -6,235                  03/27/06   06/14/06    Frank lindy plumbing Heating        
                                                            013             6,075                  08/23/05   09/02/05    Filingeri Electrical Contracting    
                                                            013             7,000                  10/06/05   10/13/05    Infinity Environmental              
                                                            014             2,176                  11/25/05     /  /      Filingeri Electrical Contracting    
                                                            014            -5,145                  02/03/06   07/21/06    Indinity evironmental               
                                                            015             5,145                  02/03/06   05/23/06    Filingeri Electrical                
                                                            016             2,876                  02/03/06   05/23/06    Filingeri Elecrtrical               
                                                            017             1,906                  02/03/06     /  /      Filingeri Electrical                
                                                            017             1,906                  02/03/06   05/23/06    FILINGERI ELECTRICAL CONTRACTING    
                                                            018               676                  02/03/06     /  /      Filingeri Electrical Contracting    
 
04-0009   Reconstruction               0-001-009  07/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1342   Reconstruction               0-001-011  05/17/07  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1319   Reconstruction               0-001-012  05/31/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC3-001        -1,085                  07/22/13   04/11/14    D.S.A. Services, Inc.               
 
13-0951   Reconstruction               0-001-013  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO-03       -9,017                  10/05/15   11/17/15    AMB Construction Inc.               
 
20-1706   Reconstruction               0-001-014  08/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1461   Reconstruction               0-001-015  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1020   Reconstruction               0-001-016  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bedford Village Elementary:
90-1501   Reconstruction               0-002-003  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0810   Reconstruction               0-002-004  02/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1698   Reconstruction               0-002-005  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0272   Additions and Alterations    0-002-006  10/31/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0383   Reconstruction               0-002-007  11/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0722   Reconstruction               0-002-008  04/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001           -4,600                  01/26/05   02/11/05    Anderson Electric                   
                                                            001            11,888                  01/02/03   01/09/04    Benaka Inc                          
                                                            001             6,641                  01/02/03     /  /      DP Wolff                            
                                                            002             2,945                  01/02/03   01/09/04    Benaka Inc                          
                                                            002             2,984                  01/02/03     /  /      DP Wolff                            
                                                            003             3,984                  01/02/03   01/13/04    DP Wolff                            
                                                            003            -2,520                  04/05/04   04/08/04    Benaka Inc                          
                                                            004             5,429                  03/03/04   03/05/04    DP Wolff                            
                                                            004             1,088                  04/05/04   04/12/04    Benaka Inc                          
                                                            005             2,797                  03/03/04   03/05/04    DP Wolff                            
                                                            005               931                  05/03/04   05/12/04    Benaka Inc                          
                                                            006             2,172                  03/22/04   04/13/04    DP Wolff                            
                                                            006             4,373                  09/27/04   10/27/04    Benaka Inc                          
                                                            007               776                  04/05/04   04/12/04    DP Wolff                            
                                                            007           -15,479                  11/18/04   11/24/04    Benaka Inc                          
                                                            008            -2,559                  05/03/04   10/12/06    DP Wolff                            
                                                            008             2,801                  11/18/04   11/24/04    Benaka Inc                          
                                                            009             1,832                  11/18/04   11/24/04    DP Wolff                            
 
04-1341   Reconstruction               0-002-009  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -16,200                  04/03/06     /  /      Milburn Flooring                    
 
09-1562   Reconstruction               0-002-010  07/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0952   Reconstruction               0-002-011  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO-01      -20,495                  10/05/15   11/17/15    AMB Construction Inc.               
 
17-0798   Reconstruction               0-002-012  01/11/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1707   Reconstruction               0-002-013  08/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1462   Reconstruction               0-002-014  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1021   Reconstruction               0-002-016  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fox Lane High School:
91-0514   Reconstruction               0-003-006  01/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1679   Reconstruction               0-003-007  07/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0405   Reconstruction               0-003-008  02/19/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1303   Reconstruction               0-003-009  07/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0790   Additions and Alterations    0-003-010  02/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                             023           27,593                  06/27/08   02/11/09    Etre Associates                     
                                                            00001          55,663                  11/25/05     /  /      Etre Associates                     
                                                            00001          31,564                  11/25/05   12/02/05    Infinity Environmental              
                                                            00001       1,761,859                  02/03/06     /  /      Forno Enterprises                   
                                                            00001       1,850,000                  02/03/06   05/23/06    Diggins mechanical Corp             
                                                            00001         980,000                  02/03/06   05/23/06    Cand B Plumbing Heating             
                                                            00001       2,514,000                  02/03/06   05/23/06    All Phase Electrical                
                                                            00001       5,093,000                  06/26/06   07/13/06    Rok-built Construction              
                                                            00001          50,000                  06/26/06   07/13/06    Villa Construction                  
                                                            00001          25,791                  10/06/06   10/19/06    schenectady Steel                   
                                                            00001          27,685                  12/07/06   05/16/07    Agrans Construction                 
                                                            00001          16,706                  10/29/07     /  /      NAC Industries                      
                                                            00001          19,408                  12/11/09   03/19/10    COLONIAL SURETY COMPANY             
                                                            00002          80,000                  02/03/06     /  /      Villa Construction                  
                                                            00002         948,900                  02/03/06     /  /      Etre Associates                     
                                                            00002          94,000                  02/03/06   05/23/06    All Phase Electrical Contracting    
                                                            00002          17,130                  03/27/06   06/14/06    Diggins Mechanical Corp             
                                                            00002          15,679                  05/04/06   08/24/06    Rok-built Construction              
                                                            00002          10,523                  10/06/06   01/09/07    Cand B Plumbing                     
                                                            00002         123,113                  10/06/06   10/19/06    Infinity Environmental              
                                                            00002          10,981                  12/20/06   01/19/07    Forno Enterprises                   
                                                            00002           9,307                  04/13/07   05/16/07    Schenectady Steel                   
                                                            00002           7,880                  09/26/07   03/19/08    NORTHEAST INTERIOR SYSTEMS, INC.    
                                                            00002           9,451                  06/02/08   08/07/08    Agras Construction Corporation      
                                                            00002           8,282                  12/17/09   03/19/10    COLONIAL SURETY COMPANY             
                                                            00003         343,700                  02/03/06     /  /      Etre Associates                     
                                                            00003          30,000                  02/03/06   05/23/06    All Phase Electrical                
                                                            00003          50,787                  03/27/06   09/27/06    Diggins mechanical                  
                                                            00003          87,168                  08/23/06   10/02/06    Rok-Built Construction              
                                                            00003          19,885                  08/23/06   10/02/06    Villa Construction                  
                                                            00003          14,610                  11/20/06   01/09/07    Infinity Environmental              
                                                            00003           3,814                  04/13/07   05/16/07    Forno Enterprises                   
                                                            00003           8,301                  04/13/07   05/16/07    Schenectady Steel                   
                                                            00003          23,873                  06/02/08   08/07/08    Agras Condtruction Corporation      
                                                            00003          63,675                  02/11/10   04/15/10    COLONIAL SURETY COMPANY             
                                                            00004         118,100                  02/03/06     /  /      ETRE ASSOCIATES                     
                                                            00004           8,461                  08/23/06   01/09/07    All Phase Electrical                
                                                            00004          17,928                  08/23/06   01/09/07    Diggins Mechanical Corp             
                                                            00004           7,623                  08/23/06   10/02/06    Villa Construction                  
                                                            00004           6,229                  10/10/06   01/09/07    C and B Plumbing Heating            
                                                            00004           5,953                  04/13/07   05/16/07    Forno Enterprises                   
                                                            00004           2,729                  06/25/07   07/17/07    Schenectady Steel                   
                                                            00004         -12,000                  06/16/10   08/10/10    COLONIAL SURETY COMPANY             
                                                            00005         110,800                  02/03/06     /  /      Etre Associates                     
                                                            00005           9,084                  08/23/06   01/09/07    Diggins Mechanical                  
                                                            00005          22,766                  12/07/06   01/24/07    Rok-Built Construction              
                                                            00005          25,893                  12/07/06   01/09/07    C and B Plumbing Heating            
                                                            00005           3,827                  04/13/07   05/16/07    All Phase Electrical                
                                                            00005           3,822                  04/13/07   05/16/07    Forno Enterprises                   
                                                            00005           9,003                  05/29/07   06/18/07    Villa Construction                  
                                                            00005           1,709                  05/29/07   06/18/07    Schenectady Steel                   
                                                            00005          23,988                  06/25/07   07/17/07    Infinity Environmental Services     
                                                            00005           3,614                  09/10/10   09/28/10    COLONIAL SURETY COMPANY             
                                                            00006           9,318                  03/27/06   06/13/06    Etre Associates                     
                                                            00006          57,151                  10/06/06   01/09/07    Diggins Mechanical                  
                                                            00006          10,852                  12/07/06   05/16/07    Rok Built                           
                                                            00006           6,916                  04/13/07   05/16/07    All Phase electrical                
                                                            00006           7,304                  05/29/07   06/18/07    Schenectady Steel                   
                                                            00006          29,654                  07/27/07   08/07/07    Infinity Environmental Services     
                                                            00006          25,051                  10/29/07   01/28/08    VILLA CONSTRUCTION                  
                                                            00006           5,262                  02/22/08   03/07/08    FORNO ENTERPRISES, INC              
                                                            00007          13,210                  03/27/06   06/13/06    Etre Associates                     
                                                            00007          47,520                  10/06/06   01/09/07    Diggins Mechanical Corp             
                                                            00007           3,840                  04/13/07   05/16/07    Rok Built Construction              
                                                            00007          18,529                  04/13/07   05/16/07    All Phase Electricla                
                                                            00007          12,356                  09/26/07   03/19/08    INFINITY ENVIRONMENTAL SERVICES INC.
                                                            00007          15,222                  10/29/07   12/27/07    Schenectady Steel                   
                                                            00007           5,896                  03/26/08   06/03/08    Villa Construction                  
                                                            00007          18,746                  07/17/08   10/21/08    FORNO ENTERPRISES, INC.             
                                                            00008          43,378                  10/06/06   01/09/07    Diggins Mechanical                  
                                                            00008          27,096                  04/13/07   05/15/07    Rok Built Construction              
                                                            00008          22,000                  04/13/07   05/16/07    All Phase Electrical                
                                                            00008           2,041                  04/13/07   05/16/07    C and B Plumbing Heating            
                                                            00008          25,550                  12/05/07   08/06/08    Schenectady Steel                   
                                                            00009          17,357                  04/13/06   06/26/06    Etre Associates                     
                                                            00009          11,872                  12/07/06   01/09/07    Diggins Mechanical                  
                                                            00009           7,671                  04/13/07   05/16/07    Rok Built Construction              
                                                            00009           3,571                  04/13/07   05/16/07    All Phase Electrical                
                                                            00009           2,542                  04/13/07   05/16/07    C and B Plumbing Heating            
                                                            0001            2,919                  09/10/07   12/27/07    NORTHEAST INTERIOR SYSTEMS, INC.    
                                                            00010          20,908                  12/07/06   01/09/07    Diggins Mechanical Corp             
                                                            00010           9,256                  04/13/07   05/16/07    Rok Built Construction              
                                                            00010           2,343                  04/13/07   05/16/07    All Phase electrical                
                                                            00010           7,511                  08/17/07   08/21/07    C & B Plumbing & Heating            
                                                            00010          80,997             997  02/22/08   03/07/08    INFINITY ENVIRONMENTAL SERVICES, INC
                                                            00010           9,400                  04/23/08   06/03/08    SCHENECTADY STEEL CO., INC.         
                                                            00011         185,111                  10/06/06   12/14/06    Etre Associates                     
                                                            00011          30,052                  04/13/07   05/15/07    Rok Built Construction              
                                                            00011           4,847                  04/13/07   05/16/07    Diggins Mechanical Corp             
                                                            00011           7,248                  05/29/07   10/23/07    All Phase Electricla                
                                                            00011           7,139                  07/27/07   10/23/07    C and B Plumbing heating            
                                                            00011           2,938                  04/23/08   06/03/08    SCHENECTADY STEEL CO., INC.         
                                                            00012          56,538                  04/13/07   05/15/07    Etre Associates                     
                                                            00012           5,654                  04/13/07   05/16/07    Rok Built Construction              
                                                            00012           1,393                  04/13/07   05/16/07    Diggins Mechanical                  
                                                            00012          18,500                  05/29/07   10/23/07    All Phase Electrical                
                                                            00012          29,111                  07/27/07   10/23/07    C and B Plumbing heating            
                                                            00012          11,641                  04/23/08   06/03/08    SCHENECTADY STEEL CO., INC.         
                                                            00013           9,521                  04/13/07     /  /      Diggins Mechanical                  
                                                            00013          11,885                  04/13/07   05/16/07    Rok Built Construction              
                                                            00013          55,902                  04/13/07   05/16/07    Etre Associates                     
                                                            00013           3,500                  05/29/07   01/15/08    All Phase Electrical                
                                                            00013           4,910                  09/26/07     /  /      C & B PLUMBING & HEATING, INC.      
                                                            00013           7,408                  04/23/08   06/03/08    SCHENECTADY STEEL CO., INC.         
                                                            00014          42,458                  04/13/07   05/15/07    Etre Associates                     
                                                            00014           9,830                  04/13/07   05/16/07    Rok built Construction              
                                                            00014             918                  04/30/07   07/27/07    Diggins Mechanical                  
                                                            00014           1,741                  05/29/07   10/23/07    All Phase Electrical                
                                                            00014          37,812                  04/23/08   06/03/08    SCHENECTADY STEEL CO., INC.         
                                                            00014          22,194                  04/23/08     /  /      C&B PLUMBING & HEATING, INC.        
                                                            00015           3,864                  04/13/07   05/16/07    Rok Built Construction              
                                                            00015           4,976                  05/29/07   10/28/07    All Phase ELectrical                
                                                            00015           4,970                  09/26/07   01/14/08    DIGGINS MECHANCIAL CORPORATION      
                                                            00015         214,905                  10/29/07   01/25/08    Etre Associates                     
                                                            00015           6,971                  04/23/08   06/03/08    C&B PLUMBING & HEATING, INC.        
                                                            00016          11,997                  05/29/07   06/18/07    Rok Built Construction              
                                                            00016             613                  05/29/07   10/23/07    All Phase Electrical                
                                                            00016           4,897                  09/26/07   03/19/08    DIGGINS MECHANICAL CORPORATION      
                                                            00016          15,861                  10/29/07   01/28/08    Etre Associates                     
                                                            00016           1,523                  06/02/08   09/29/08    C&B Plumbing & Heating,Inc.         
                                                            00017          27,307                  06/25/07   04/18/08    All Phase Electrical                
                                                            00017          21,569                  07/27/07   08/07/07    ROk built Construction              
                                                            00017          32,172                  10/29/07   01/28/08    ETRE ASSOCIATES, LTD.               
                                                            00017          11,597                  03/06/08     /  /      Diggins Mechanical Corporation      
                                                            00018          26,763                  07/27/07   08/07/07    Rok Built Construction              
                                                            00018          14,780                  07/27/07   10/24/07    All Phase Electrical                
                                                            00018          14,995                  02/22/08   04/04/08    ETRE ASSOCIATES, LTS.               
                                                            00018           6,233                  06/29/08   09/29/08    DIGGINS MECHANICAL CORPORATION      
                                                            00019          17,424                  06/25/07   07/17/07    Rok Built Construction              
                                                            00019           8,755                  07/27/07   10/24/07    all Phase Electrical                
                                                            00019          18,981                  02/22/08   03/07/08    ETRE ASSOCIATES, LTD.               
                                                            00019          52,830                  06/27/08   02/11/09    Diggins Mechanical                  
                                                            0002            7,880                  09/26/07     /  /      NORTHEAST INTERIOR SYSTEMS, INC.    
                                                            00020           7,232                  06/25/07   07/17/07    Rok-Built Construction              
                                                            00020           5,175                  10/29/07   01/24/08    All Phase Electrical Contracting    
                                                            00020          78,251                  03/26/08   04/01/08    Etre Associates                     
                                                            00020         -11,317                  08/25/08   10/07/08    DIGGINS MECHANICAL CORPORATION      
                                                            00021           5,390                  06/25/07   07/17/07    Rok Built Construction              
                                                            00021           5,778                  10/29/07   01/24/08    All Phase Electrical Contracting    
                                                            00021          32,209                  03/26/08   04/01/08    ETRE Associates                     
                                                            00022          19,847                  09/10/07   11/07/07    ROK - BUILD CONSTRUCTION            
                                                            00022           5,510                  10/29/07   01/24/08    All Phase Electrical Contracting    
                                                            00022          70,588                  04/23/08     /  /      ETRE ASSOCIATES, LTD.               
                                                            00023          14,812                  09/10/07   12/27/07    ROK - BUILT CONSTRUCTION            
                                                            00023           7,562                  03/06/08   04/18/08    All Phase Electrical Contracting    
                                                            00024           8,861                  09/26/07   01/15/08    ROK - BUILT CONSTRUCTION            
                                                            00024           9,808                  03/06/08   04/29/08    All Phase Electrical Contracting    
                                                            00024          37,679                  07/17/08   10/21/08    ETRE ASSOCIATES LTD.                
                                                            00025           5,434                  09/26/07   01/15/08    ROK - BUILT CONSTRUCTION            
                                                            00025          13,033                  03/06/08   06/03/08    All Phase Electrical Contracting    
                                                            00025          47,180                  07/17/08   10/21/08    ETRE ASSOCIATES, LTD.               
                                                            00026           7,802                  10/29/07   12/27/07    Rok-Built Construction              
                                                            00026           3,800                  04/23/08   06/03/08    ALL PHASE ELECTRICAL CONTRACTING    
                                                            00026           9,056                  12/17/09   03/19/10    ETRE ASSOCIATES LTD                 
                                                            00027          13,957                  09/26/07   01/15/08    ROK - BUILT CONSTRUCTION            
                                                            00028          16,503                  10/29/07   12/27/07    Rok-Built Construction              
                                                            00028           2,134                  04/23/08     /  /      ALL PHASE ELECTRICAL CONTRACTING    
                                                            00029           6,192                  09/26/07   01/15/08    ROK - BUILT CONSTRUCTION            
                                                            00030           7,493                  10/29/07   12/27/07    Rok-Built Construction              
                                                            00031          12,017                  12/05/07   01/07/08    ANGELO FERRI                        
                                                            00032           9,608                  10/29/07   12/27/07    Rok-Built Construction              
                                                            00033           7,713                  10/29/07   12/27/07    Rok-Built Construction              
                                                            00034          12,898                  02/22/08   03/07/08    ROK-BUILT CONSTRUCTION              
                                                            00035          17,980                  03/06/08   04/18/08    Rok-Built Construction              
                                                            00036          22,014                  02/20/08   03/07/08    ROK-BUILT CONSTRUCTION              
                                                            00037           3,134                  02/22/08   03/07/08    ROK-BUILT CONSTRUCTION              
                                                            00038           7,723                  02/22/08   03/07/08    ROK-BUILT CONSTRUCTION              
                                                            00039          21,235                  03/06/08   04/24/08    Rok-Built Construction              
                                                            00039          21,235                  03/06/08     /  /      Rok-Built Construction              
                                                            00040          29,737                  03/06/08   04/18/08    Rok-Built Construction              
                                                            00041          16,643                  03/26/08   06/03/08    ROK - BUILT CONSTRUCTION            
                                                            00042           3,735                  10/22/08   03/11/09    ROK-BUILT CONSTRUCTION              
                                                            00043          24,390                  08/25/08   02/05/09    Rok Built Construction              
                                                            00044          19,389                  08/25/08   02/05/09    Rok Built Construction              
                                                            00045           9,931                  08/25/08   02/05/09    Rok-Built Construction              
                                                            0008            9,337                  05/04/06   08/09/06    Etre Associates                     
 
03-0789   Reconstruction               0-003-012  04/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           4,600                  03/22/05   04/14/05    Andron Construction                 
                                                            00002           1,650                  01/07/05   01/25/05    Infinity Environmental              
 
09-1203   Reconstruction               0-003-013  05/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  05/19/11   07/21/11    ARROW STEEL WINDOW CORP             
                                                            GC-002         -2,300                  03/16/12   08/31/12    ARROW STEEL WINDOW CORP             
 
07-1904   Reconstruction               0-003-014  05/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            14,657                  11/24/08   02/18/09    MENGLER MECHANCIAL, INC.            
                                                            002            19,151                  05/07/09   08/04/09    Leed Industries Corp.               
                                                            1               2,250                  02/23/09   04/23/09    LEED INDUSTERIES CORP.              
 
10-1057   Reconstruction               0-003-015  05/31/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1320   Reconstruction               0-003-016  05/31/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0938   Reconstruction               0-003-017  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  12/16/16   01/10/17    AMB Construction, Inc.              
                                                            00002               0                  12/16/16   01/10/17    AMB Construction, Inc.              
                                                            00003               0                  12/16/16   01/10/17    AMB Construction, Inc.              
                                                            00004               0                  12/16/16   01/10/17    AMB Construction, Inc.              
                                                            00005               0                  12/16/16   01/10/17    AMB Construction, Inc.              
                                                            00006               0                  12/16/16   01/10/17    AMB Construction, Inc.              
                                                            GC-01         152,250         152,250  12/22/14   01/13/15    ELQ Industeries, Inc.               
                                                            GC-02          18,021                  04/17/15   06/18/15    ELQ Industries, Inc.                
                                                            GC-03         -48,176                  04/17/15   06/18/15    ELQ Industries Inc.                 
                                                            RC-CO-01       -1,125                  01/11/17   08/23/17    AMB Construction Inc.               
                                                            RC-CO02       -13,176                  11/20/17   12/04/17    AMB Construction Inc.               
 
15-0007   Reconstruction               0-003-018  09/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  11/02/16   11/03/16    Landscape Unlimited                 
                                                            00002               0                  11/02/16   11/03/16    Landscape Unlimited                 
                                                            GC-CO-02     -112,200                  12/16/16   12/22/16    Landscape Unlimited                 
                                                            GC-CO-03      -22,500                  12/16/16   12/22/16    Landscape Unlimited                 
                                                            GC-CO-04      -22,137                  12/16/16   12/22/16    Landscape Unlimited                 
                                                            GC-CO-05      -24,000                  04/11/17   04/20/17    Landscape Unlimited                 
                                                            GC-CO-06     -178,000                  04/11/17   07/09/19    Landscape Unlimited                 
                                                            GCcO-01      -278,000                  12/13/16   12/16/16    Landscape Unlimited                 
 
20-1463   Reconstruction               0-003-019  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1022   Reconstruction               0-003-021  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1955   Reconstruction               0-003-022  10/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bedford Hills Elementary:
91-1054   Reconstruction               0-004-007  04/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1699   Reconstruction               0-004-008  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0273   Additions and Alterations    0-004-009  10/31/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1711   Reconstruction               0-004-011  04/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0521   Reconstruction               0-004-013  07/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001             345                  08/23/06   08/25/06    Rocco Russo                         
                                                            00001          52,223                  12/07/06     /  /      ACS Systems Associates              
                                                            00002          -6,841                  10/06/06   10/19/06    rocco Russo                         
                                                            00002          19,936                  11/01/06   12/18/06    NAC Industries                      
                                                            00002          26,400                  04/13/07     /  /      ACS Systems Associates              
                                                            00003           1,181                  11/20/06   01/09/07    Rocco Russo                         
                                                            00003          40,440                  12/07/06   01/30/07    Nac Industires                      
                                                            00003          -5,000                  04/23/08   02/18/09    ACS SYSTEMS ASSOCIATES              
                                                            00004           6,000                  12/18/06   12/18/06    Rocco Russo                         
                                                            00004          12,420                  04/13/07   05/15/07    NAC Industries                      
                                                            00005          26,707                  12/07/06     /  /      Rocco Russo                         
                                                            00005           7,500                  01/28/08   04/15/08    NAC Industries                      
                                                            00006           5,361                  11/20/06   01/09/07    Rocco Russo                         
                                                            00006         -39,118                  04/23/08   08/18/08    NAC INDUSTRIES                      
                                                            00007           1,475                  12/20/06   01/30/07    Rocco Russo                         
                                                            00008-          2,685                  10/20/06   01/30/07    Rocco Russo                         
                                                            00009           4,423                  04/13/07   08/20/07    Rocco Russo                         
                                                            0001           14,925                  11/01/06   12/18/06    NAC Induistries                     
                                                            00019           6,000                  11/01/06     /  /      rocco Russo                         
 
03-0807   Reconstruction               0-004-014  04/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           7,010                  11/18/04   11/23/04    US Construction                     
                                                            00002           6,000                  05/31/05   06/14/05    Andron Construction                 
                                                            002                 0                  12/10/10   02/18/11    CON-TECH CONSTRUCTION TECHNOLOGIES  
                                                            003                 0                  12/10/10   02/18/11    CON-TECH CONSTRUCTION TECHNOLOGIES  
                                                            004                 0                  12/10/10   02/18/11    CON-TECH CONSTRUCTION TECHNOLOGIES  
                                                            GC-01          -1,203                  11/03/10   11/16/10    CON-TECH CONSTRUCTION TECHNOLOGIES  
 
10-1085   Reconstruction               0-004-015  06/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0953   Reconstruction               0-004-016  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO-02      -11,478                  10/05/15   11/17/15    AMB Construction Inc.               
 
20-1708   Reconstruction               0-004-017  08/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1464   Reconstruction               0-004-018  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1023   Reconstruction               0-004-020  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1956   Reconstruction               0-004-021  10/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mt Kisco Elementary:
93-0059   Reconstruction               0-006-005  09/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1700   Reconstruction               0-006-006  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1678   Reconstruction               0-006-007  07/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1304   Reconstruction               0-006-009  07/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2050   Additions and Alterations    0-006-010  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           2,447                  03/22/05   03/31/05    Talt Electric                       
                                                            00001           1,523                  05/05/05     /  /      Shawns Lawns                        
                                                            00001           2,602                  05/05/05   07/20/05    Alert Action Inc                    
                                                            00001            -154                  05/31/05   07/21/05    Rok-Built Construction              
                                                            00001           4,689                  07/01/05   07/19/05    Frank Lindy plumbing                
                                                            00001          37,794                  09/29/05     /  /      Duncan industries Corp              
                                                            00001             344                  11/25/05   02/10/06    Schenectady Steel                   
                                                            00002           1,510                  05/05/05   07/20/05    shawns Lawns                        
                                                            00002            -400                  05/31/05   07/21/05    schenectady Steel Co                
                                                            00002             802                  06/23/05   07/20/05    Villa Construction                  
                                                            00002           5,305                  07/01/05   07/19/05    talt Electric                       
                                                            00002           4,728                  07/01/05   07/19/05    Rok-Built Construction              
                                                            00002           6,904                  09/28/05   10/24/05    Duncan Industries Corp              
                                                            00002           3,932                  02/03/06   07/21/06    Frank Lindy Plumbing heating        
                                                            00003           1,282                  05/05/05   07/20/05    Shawns Lawns                        
                                                            00003             573                  07/01/05   07/19/05    Schenectady Steel Co                
                                                            00003           5,000                  11/25/05   02/10/06    Rok-Built Construction              
                                                            00003           4,895                  02/03/06   05/23/06    talt Electric                       
                                                            00003           1,647                  02/03/06   07/21/06    Frank Lindy Plumbing                
                                                            00003           9,808                  04/20/06   07/14/06    Villa Construction                  
                                                            00003          24,849                  12/07/06   01/31/07    Duncan Industries                   
                                                            00004          12,718                  05/31/05   07/21/05    Shawns Lawns                        
                                                            00004          -4,795                  11/25/05   02/10/06    Rok-Built Construction              
                                                            00004          24,887                  02/03/06   07/21/06    Schenectady Steel                   
                                                            00004           1,443                  03/27/06   06/14/06    talt Electric                       
                                                            00004           1,403                  10/10/06   10/24/06    Villa Construction                  
                                                            00004           1,628                  04/13/07   05/15/07    Rok Built Construction              
                                                            00005           1,624                  06/23/05   07/20/05    Shawns Lawn                         
                                                            00005           3,974                  11/25/05   02/10/06    Rok-Built Construction              
                                                            00005           8,140                  02/03/06   07/21/06    Schenectady Steel                   
                                                            00005           2,052                  03/27/06   06/14/06    talt Electric                       
                                                            00005           2,377                  04/13/06   06/26/06    Duncan Industries                   
                                                            00005           3,950                  08/23/06   12/27/06    Frank Lindy Plumbing                
                                                            00005           2,789                  10/10/06   10/24/06    villa Construction                  
                                                            00006          18,555                  09/28/05   10/24/05    Shawns lawn                         
                                                            00006           2,415                  02/03/06   06/26/06    Rok-Built Construction              
                                                            00006           5,906                  03/27/06   06/14/06    talt Electric                       
                                                            00006           3,252                  04/13/06   06/26/06    schenectady Steel                   
                                                            00006           4,897                  11/27/06   01/09/07    Frank Lindy Plumbing                
                                                            00007           5,360                  11/25/05     /  /      shawns Lawns                        
                                                            00007           7,302                  02/03/06   07/21/06    Rok-built Construction              
                                                            00007           4,834                  03/27/06   06/14/06    talt Electric                       
                                                            00007          11,725                  04/13/06   06/26/06    Duncan Industries                   
                                                            00007           9,317                  10/06/06   12/18/06    schenectady Steel                   
                                                            00007           5,797                  11/27/06   01/09/07    Frank Lindy Plumbing                
                                                            00008           6,218                  11/25/05   02/10/06    Shawns Lawns                        
                                                            00008         -15,000                  02/03/06   07/21/06    Rok-built Construction              
                                                            00008           1,206                  03/27/06   06/14/06    Talt Electric                       
                                                            00008           7,233                  10/06/06   12/18/06    schenectady Steel                   
                                                            00008          16,000                  10/10/06   10/24/06    Villa Construction                  
                                                            00008           3,741                  10/10/06   01/09/07    Duncan Industries                   
                                                            00009           8,715                  03/27/06   05/09/06    Shawns Lawns                        
                                                            00009           6,040                  03/27/06   05/09/06    Rok-Built Construction              
                                                            00009             906                  04/13/06   06/26/06    talt Electric                       
                                                            00009           1,319                  10/06/06   01/09/07    Duncan Industries                   
                                                            00009          22,050                  05/29/07   06/20/07    Villa Construction                  
                                                            00009          22,050                  06/18/07   07/17/07    Villa Construction                  
                                                            00010           3,905                  03/27/06   06/14/06    talt ELectric                       
                                                            00010           1,622                  04/13/06   06/26/06    Rok-built Construction              
                                                            00010           4,350                  10/06/06   12/18/06    Schenectady Steel                   
                                                            00010           9,276                  10/06/06   01/09/07    Duncan Industries                   
                                                            00010          12,005                  10/06/06   12/18/06    shawns Lawns                        
                                                            00011           1,649                  04/13/06   06/26/06    talt Electric                       
                                                            00011           4,598                  04/13/06   06/26/06    Rok-Built Construction              
                                                            00011           3,104                  10/06/06   12/18/06    shawns Lawn                         
                                                            00011           6,634                  10/10/06   12/13/06    Schenetady Steel                    
                                                            00011          12,491                  11/27/06   01/09/07    Duncan Industries Corp              
                                                            00012           2,458                  04/13/06   06/26/06    Talt Electric                       
                                                            00012           2,037                  04/13/06   06/26/06    Rok-Built Construction              
                                                            00012             343                  10/06/06   12/18/06    schenectady Steel                   
                                                            00012           1,631                  10/06/06   12/18/06    shawns Lawn                         
                                                            00012           2,200                  05/29/07   06/20/07    Duncan Industries                   
                                                            00012           2,200                  06/18/07     /  /      Duncan Industries                   
                                                            00013           3,974                  04/13/06   06/26/06    talt Electric                       
                                                            00013           4,813                  05/04/06   07/24/06    Rok-built Construction              
                                                            00013           2,009                  04/13/07   05/15/07    Schenectady Steel                   
                                                            00013           7,512                  06/25/07   07/17/07    Duncan Industries Corp              
                                                            00014           1,070                  04/13/06   06/26/06    talt Electric                       
                                                            00014           4,400                  12/07/06   01/30/07    Shawns Lawns                        
                                                            00014         -20,000                  04/30/07   05/15/07    Schenectady Steel                   
                                                            00014          27,278                  07/17/08   10/21/08    DUNCAN INDUSTERIES CORP.            
                                                            00015          17,029                  06/26/06   10/27/06    Talt Electric                       
                                                            00015          14,480                  10/10/06   10/24/06    Rok built Construction              
                                                            00015          40,127                  04/30/07   05/15/07    Shawns Lawns                        
                                                            00015         -17,582                  06/02/08   08/28/08    Schenectady Steel Co.               
                                                            00015           5,000                  07/17/08   10/21/08    DUNCAN INDUSTERIES CORP.            
                                                            00016          30,682                  08/23/06   08/25/06    Rok-Built Construction              
                                                            00016           4,123                  11/20/06     /  /      Talt Electric                       
                                                            00016           6,935                  04/13/07   05/15/07    Shawns Lawn                         
                                                            00016           6,247                  06/12/08   09/29/08    DUNCAN INDUSTERIES CORP.            
                                                            00017          22,498                  08/23/06   08/25/06    Rok-Built Construction              
                                                            00017           4,256                  08/23/06   01/09/07    Talt Electric                       
                                                            00017           3,381                  04/13/07   05/15/07    Shawns Lawn                         
                                                            00017          10,477                  06/12/08   05/11/09    DUNCAN INDUSTERIES CORP.            
                                                            00018          22,349                  08/23/06   08/25/06    Rok-Built Construction              
                                                            00018          21,380                  08/23/06   01/09/07    Talt Electric                       
                                                            00018          23,268                  06/25/07   07/17/07    Shawns Lawn                         
                                                            00018           4,686                  06/12/08   05/11/09    DUNCAN INDUSTERIES CORP.            
                                                            00019          17,062                  10/10/06   01/09/07    talt Electric                       
                                                            00019           3,274                  11/01/06   12/18/06    Rok Built Construction              
                                                            00019          35,424                  06/25/07   07/17/07    Shawns Lawn                         
                                                            00020           5,143                  11/20/06   01/09/07    Rok Built Construction              
                                                            00020           3,342                  11/20/06   01/09/07    Talt Electric                       
                                                            00021          17,000                  11/20/06   01/09/07    Talt Electric                       
                                                            00021          11,346                  04/30/07   05/15/07    Rok-Built Construction              
                                                            00022           6,355                  11/20/06   01/09/07    Talt Electric                       
                                                            00022           3,633                  11/27/06   01/09/07    Rok-Built Construction              
                                                            00023          -7,279                  05/29/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            00024           2,943                  04/13/07   05/16/07    talt Electric                       
                                                            00024           9,824                  04/30/07   05/15/07    Rok-Built Construction              
                                                            00025           5,239                  04/13/07   05/16/07    Talt Electric                       
                                                            00025           3,389                  04/30/07   05/15/07    Rok-Built Construction              
                                                            00026          13,041                  04/13/07   05/16/07    Talt Electric                       
                                                            00026           2,413                  04/30/07   05/15/07    Rok-Built Construction              
                                                            00027          16,502                  04/30/07   07/27/07    Talt Electric                       
                                                            00027          11,152                  05/29/07   06/20/07    Rok-Built Construction              
                                                            00028           1,540                  04/30/07   05/15/07    Rok Built Construction              
                                                            00028           1,469                  04/30/07   07/27/07    Talt Electric                       
                                                            00029          11,270                  05/29/07     /  /      Rok Built Construction              
                                                            00029          11,270                  06/18/07   07/17/07    Rok Built Construction              
                                                            00029           1,637                  03/06/08   04/18/08    Talt Electric                       
                                                            00030          23,866                  06/25/07   07/17/07    Rok-Built Construction              
                                                            00031           9,690                  06/25/07   07/17/07    Rok-Built Construction              
                                                            00032          14,474                  08/17/07   08/21/07    Rok-Built Construction              
                                                            0006          -10,000                  04/13/06     /  /      Duncan Industries Corp              
 
06-0853   Reconstruction               0-006-011  04/26/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,818                  12/24/07   01/07/08    ELQ INDUSTRIES, INC.                
 
20-1709   Reconstruction               0-006-012  08/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1465   Reconstruction               0-006-013  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1024   Reconstruction               0-006-015  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1957   Reconstruction               0-006-016  10/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fox Lane Middle School:
97-0631   Additions and Alterations    0-007-002  03/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1823   Reconstruction               0-007-003  08/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0808   Reconstruction               0-007-004  03/26/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -10,368                  05/05/05   06/10/05    Hi Tech                             
                                                            00002           3,500                  05/05/05   06/10/05    Hi Tech                             
 
04-0522   Additions and Alterations    0-007-005  07/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          30,000                  04/13/07     /  /      All Phase Electric                  
                                                            00001         -11,450                  06/18/10   12/17/10    COLONIAL SURETY COMPANY             
                                                            00002         -59,826                  04/23/08   08/18/08    NAC INDUSTRIES INC.                 
 
05-1014   Reconstruction               0-007-006  06/02/06  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0020   Additions and Alterations    0-007-007  01/08/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,841                  06/22/15   09/16/20    H & E Equipment Corp.               
                                                            EC-01          21,765                  09/08/15   10/01/15    Solar Electric                      
                                                            EC-02         -20,458                  11/02/15   12/01/15    Solar Electric                      
                                                            EC-03           2,189                  11/02/15   12/01/15    Solar Electric                      
                                                            EC-04           7,424                  01/28/16   02/12/16    Solar Electric                      
                                                            EC-05           9,991                  01/28/16   02/12/16    Solar Electric                      
                                                            EC-06           2,631                  11/03/20   01/25/21    SOLAR ELECTRIC                      
                                                            EC-06           2,631                  11/03/20     /  /      SOLAR ELECTRIC                      
                                                            EC-07           1,701                  12/13/16   01/06/17    Solar Electric                      
                                                            EC-08           3,660                  11/02/16   11/07/16    Solar Electric                      
                                                            EC-09           6,717                  11/02/16   11/07/16    Solar Elelctric                     
                                                            EC-10            -293                  11/02/16   11/07/16    Solar Electric                      
                                                            EC-11           2,888                  01/11/17   01/13/17    Solar Electric                      
                                                            GC-01          -1,026                  09/08/15   10/01/15    Plazza Brothers                     
                                                            GC-02          17,000                  10/19/15   11/19/15    Piazza Inc.                         
                                                            GC-03          32,000                  10/19/15   11/19/15    Piazza Inc.                         
                                                            GC-04         108,600                  10/29/15   12/01/15    Piazza Inc.                         
                                                            GC-05           4,273                  06/20/16   07/27/16    Piazza Inc.                         
                                                            GC-CO-06        9,232                  06/20/16   07/27/16    Piazza Inc.                         
                                                            GC-CO-07        3,255                  12/16/16   12/27/16    Piazza, Inc.                        
                                                            GC-CO-08      -32,562                  12/16/16   12/27/16    Piazza, Inc.                        
                                                            GC-CO-09       -6,719                  12/16/16   12/27/16    Piazza, Inc.                        
                                                            GC-CO-10      -12,100                  12/16/16   12/27/16    Piazza, Inc.                        
                                                            GC-CO-11          785                  01/11/17   01/27/17    Piazza Inc.                         
                                                            GC-CO-12        4,297                  01/11/17   01/27/17    Piazza Inc.                         
                                                            MC-AD04             0                  01/11/17   01/13/17    Mengler Mechanical                  
                                                            MC-CO01        15,552                  11/04/15   12/01/15    Mengler Mechanical                  
                                                            MC-CO02        19,458                  11/02/16   11/07/16    Mengler Mechanical                  
                                                            MC-CO03        -6,015                  01/11/17   01/13/17    Mengler Mechanical                  
                                                            PC-02          20,554                  11/03/20   01/25/21    TWP PLUMBING & HEATING              
                                                            PC-03           2,094                  11/03/20   01/25/21    TWP PLUMBING & HEATING              
                                                            PC-CO-01       12,180                  10/23/15   11/19/15    TWP Plumbing & Heating              
                                                            PC-CO-04       12,294                  11/02/16   11/04/16    TWP Plumbing & Heating              
                                                            PC-CO-05       -3,657                  12/16/16   01/06/17    TWP Plumbing and Heating            
 
20-1272   Reconstruction               0-007-008  04/30/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1466   Reconstruction               0-007-009  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1025   Reconstruction               0-007-011  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1958   Reconstruction               0-007-012  10/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Patent Elem:
96-1479   Reconstruction               0-009-003  05/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1497   Reconstruction               0-009-005  11/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0721   Reconstruction               0-009-006  04/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,711                  01/02/03   01/13/04    DP Wolff                            
                                                            001            11,952                  01/02/03   01/13/04    Talt Elec.                          
                                                            001             6,558                  01/02/03   01/13/04    Southeast Mech.                     
                                                            001           -37,200                  08/16/04   09/23/04    Benaka Inc                          
                                                            002             5,306                  01/02/03   01/13/04    DP Wolff                            
                                                            002             2,810                  04/05/04   04/08/04    Talt Elec.                          
                                                            003           -10,100                  04/05/04   04/08/04    DP Wolff                            
                                                            004             1,917                  05/03/04   05/11/04    DP Wolff                            
                                                            005            11,227                  09/27/04   12/24/04    Infinity Environmental Service      
                                                            005             4,659                  11/18/04   12/06/04    DP Wolff Inc                        
 
04-1342   Reconstruction               0-009-007  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            WP-001        -13,000                  04/03/06     /  /      Milburn Flooring Mills              
 
14-0042   Reconstruction               0-009-008  01/06/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,166                  11/02/16   11/04/16    Southeast Plumbing                  
                                                            000011              0                  11/02/16   11/04/16    RW Dake                             
                                                            00002          -1,112                  11/02/16   11/04/16    Southeast Plumbing Corp.            
                                                            00006               0                  11/02/16   11/04/16    RW Dake                             
                                                            00007               0                  11/02/16   11/04/16    RW Dake                             
                                                            00008               0                  11/02/16   11/04/16    RW Dake                             
                                                            00009               0                  11/02/16   11/04/16    RW Dake                             
                                                            00010               0                  11/02/16   11/04/16    RW Dake                             
                                                            EC-AD03             0                  11/02/16   11/04/16    All Bright Electric                 
                                                            EC-AD04             0                  11/02/16   11/04/16    All Bright Electric                 
                                                            EC-AD05             0                  12/16/16   01/06/17    All Bright Electric                 
                                                            EC-CO-02       -5,423                  12/16/16   01/06/17    All Bright Electric                 
                                                            GC-001          5,855                  11/16/15   12/23/15    RW Dake                             
                                                            GC-002          2,048                  11/16/15   12/01/15    RW Dake                             
                                                            GC-CO01         5,855                  11/04/15   12/01/15    RW Dake                             
                                                            GC-CO02         2,048                  11/04/15   12/01/15    RW Dake                             
                                                            GC-CO03         9,296                  11/04/15   12/01/15    DW Dake                             
                                                            GC-CO05      -106,189                  11/02/16   11/04/16    RW Dake                             
                                                            GC-CO06        -4,125                  11/02/16   11/04/16    RW Dake                             
                                                            GC-CO07        -6,831                  11/02/16   11/04/16    RW Dake                             
                                                            MC-AD05             0                  11/02/16   11/04/16    Mengler Mechanical                  
                                                            MC-AD06             0                  11/02/16   11/04/16    Mengler Mechanical                  
                                                            MC-CO-01         -521                  12/16/16   01/06/17    Mengler Mechanical                  
                                                            PC-AD03             0               2  11/02/16   11/04/16    Southeast Plumbing                  
                                                            SC-CO07        -5,261                  07/31/17   08/02/17    Landscape Unlimited                 
 
13-1307   Reconstruction               0-009-009  05/13/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO04        70,000                  12/13/16   01/11/17    RW Dake                             
                                                            RC-001         -7,055                  01/28/16   02/08/16    United Roofing                      
                                                            RC-CO02           464                  11/02/16   01/11/17    United Roofing                      
                                                            SC-CO01         9,847                  11/04/15   11/27/15    Landscape Unlimited                 
                                                            SC-CO02        30,890                  06/20/16   09/30/16    Landscape Unlimited                 
                                                            SC-CO03         3,344                  12/13/16   01/11/17    Landscape Unlimited                 
                                                            SC-CO04        20,900                  12/13/16   01/11/17    Landscape Unlimited                 
                                                            SC-CO05        23,450                  11/02/16   01/11/17    Landscape Unlimited                 
                                                            SC-CO06         5,398                  11/02/16   01/11/17    Landscape Unlimited                 
 
17-0797   Reconstruction               0-009-010  01/05/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1710   Reconstruction               0-009-011  08/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1467   Reconstruction               0-009-012  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1026   Reconstruction               0-009-014  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fox Lane M.S. Gym:
98-0261   Reconstruction               0-015-003  10/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Relocatable @ Bedford Village:
96-1572   New Construction             0-021-001  05/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg:
97-1824   Reconstruction               1-008-002  08/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1753   Reconstruction               1-008-003  05/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1198   Reconstruction               1-008-006  05/24/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -10,824                  03/16/12   08/03/12    FILINGERI ELECTRIC                  
 
11-1321   Reconstruction               1-008-008  05/31/12  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1873   Reconstruction               1-008-009  05/24/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0235   Reconstruction               1-008-011  09/10/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1468   Reconstruction               1-008-013  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Offices:
97-1825   Reconstruction               1-017-003  08/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0499   Reconstruction               1-017-004  03/07/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ Fox Lane High School:
04-1457   New Construction             7-022-001  08/19/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          WASTE WATER TREATMENT PLANT:
07-0306   New Construction             7-023-001  10/23/07  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0554   Reconstruction               7-023-002  04/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE

CROTON HARMON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-02-02-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
91-1549   Reconstruction               0-001-006  07/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1174   Reconstruction               0-001-007  05/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1257   Reconstruction               0-001-008  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0824   Reconstruction               0-001-009  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1018   Reconstruction               0-001-010  04/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0446   Reconstruction               0-001-011  01/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1216   Reconstruction               0-001-012  04/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0660   Reconstruction               0-001-013  01/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0289   Reconstruction               0-001-014  10/03/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           25,102                  04/04/03   04/14/03    JW Stevens                          
                                                            GC-2           29,680                  01/08/03   01/27/03    JW Stevens                          
                                                            GC-3           -2,000                  08/28/03   09/05/03    JW Stevens                          
 
03-0002   Additions and Alterations    0-001-015  09/19/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           4,655                  03/18/09   05/26/09    PIAZZA BROTHERS, INC.               
                                                            GC-02R         11,787                  10/03/05   10/13/05    Piazza brothers                     
                                                            GC-03R         10,767                  10/03/05   10/13/05    Piazza Brothers                     
                                                            GC-04R         14,953                  10/03/05   10/13/05    Piazza brothers                     
                                                            GC-05R         15,133                  10/03/05   10/13/05    PIazza brothers                     
                                                            GC-06R         12,069                  10/03/05   10/13/05    Piazza Brothers                     
                                                            GC-07          46,185                  10/03/05   10/13/05    Piazza brothers                     
                                                            GC-08          12,701                  10/03/05   10/13/05    Piazza Brothers                     
                                                            GC-09          25,285                  10/03/05   10/13/05    Piazza Brothers                     
                                                            GC-14          18,221                  03/18/09     /  /      PIAZZA BROTHERS, INC.               
                                                            GC-15           6,129                  03/18/09   05/26/09    PIAZZA BROTHERS, INC.               
                                                            GC-16           1,359                  03/18/09   05/26/09    PIAZZA BROTHERS, INC.               
                                                            PC-01          43,000                  03/18/09   06/24/09    BENEWAY, INC.                       
                                                            PC-02         -38,616                  03/18/09   06/24/09    Beneway                             
                                                            PC-03         -58,117                  03/18/09   06/24/09    Beneway                             
 
01-1415   Reconstruction               0-001-016  07/15/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-1            3,660                  04/15/03   04/17/03    Diggins Mech.                       
                                                            HC-2           -4,300                  03/03/04   04/12/04    Diggins Mech.                       
 
08-1524   Reconstruction               0-001-018  08/11/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1411   Reconstruction               0-001-019  11/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0426   Reconstruction               0-001-020  03/31/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -1,583                  09/22/11   11/01/11    PETER A CAMILLI & SONS INC          
                                                            GC-001         -5,595                  07/10/12   01/10/13    PETER A CAMILLI & SONS INC          
                                                            GC-002         -2,500                  01/12/12   04/06/12    PETER A CAMILLI & SONS INC          
                                                            GC-003         -4,405                  08/28/12   12/21/12    PETER A CAMILLI & SONS INC          
 
10-1099   Reconstruction               0-001-021  05/03/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC1-001        26,508                  09/15/11   12/20/11    MONPAT CONSTRUCTION INC             
                                                            GC1-002        -2,338                  01/12/12   04/05/12    MONPAT CONSTRUCTION INC             
                                                            GC1-003        -1,200                  06/11/12   11/09/12    MONPAT CONSTRUCTION INC             
 
10-1211   Reconstruction               0-001-022  05/13/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002         -2,470                  09/22/11   11/04/11    NIRAM INC                           
                                                            GC-004         -5,807                  01/12/12   03/16/12    NIRAM INC                           
 
11-1150   Reconstruction               0-001-023  10/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD1HS001       10,900                  10/10/14   10/16/14    Caldri Development Corp.            
                                                            AD2-002             0                  10/10/14   10/20/14    Caldri Development Corp.            
                                                            CN01-003       58,400                  10/10/14   01/13/15    Caladri Development Corp            
                                                            CN01-022       12,557                  10/10/14   10/16/14    Caladri Development Corp            
                                                            COM2-009      -12,891                  02/02/16   02/08/16    CALADRI DEVELOPMENT CORP            
                                                            CON1-005      -29,286                  02/02/16   02/08/16    CALADRI DEVELOPMENT CORP            
                                                            CON2-001        2,135                  10/10/14   10/16/14    Caladri Development Corp            
                                                            CON2-006       -4,959                  10/10/14   10/20/14    Caladri Development Corp            
                                                            CON2-007       10,325                  03/31/16   04/12/16    Caladri Development Corp            
                                                            GC-HS001        8,225                  06/11/13   07/03/14    Raw Power Electric Corp             
 
14-0092   Reconstruction               0-001-024  02/25/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HS-001        -11,300                  04/05/16   04/12/16    Clean Air Quality Service, Inc.     
                                                            HS-001              0                  04/05/16   04/12/16    Clean Air Quality Service, Inc.     
 
17-0394   Reconstruction               0-001-027  03/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-17          -5,002                  05/09/19   05/10/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            GC-12          27,437                  01/16/19   02/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-17           2,730                  07/10/19   07/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-18           9,034                  07/10/19   07/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-19           8,348                  07/10/19   07/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-21           1,019                  11/06/19   11/08/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-23          70,545                  11/06/19   11/08/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-24           5,283                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-25           4,095                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-31           1,568                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-34           4,299                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-35           1,416                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-36            -459                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-37          -2,853                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-38            -799                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            MC-01          48,299                  03/11/19   03/14/19    CLEAN AIR QUALITY SERVICES,INC.     
                                                            SC-09          25,156                  10/04/19   10/28/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-10           3,331                  10/04/19   10/28/19    DEROSA SPORTS CONSTRUCTION, INC.    
 
17-0395   Reconstruction               0-001-028  09/04/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          17,500                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-02           7,703                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-03          -5,201                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            GC-01         -25,068                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-02         -18,899                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-03          24,675                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-04          -2,879                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            MC-01          -1,182                  12/04/19   12/11/19    L&M HEATING & AIR CONDITIONING, INC.
                                                            MC-02          -1,903                  12/04/19   12/11/19    J&M HEATING & AIR CONDITIONING, INC.
                                                            MC-03         -67,362                  08/27/20   11/04/20    J&M HEATING AND AIR CONDITIONING,INC
                                                            MC-12          39,828                  08/27/20   11/03/20    CLEAN AIR QUALITY SERVICE, INC.     
 
19-0007   Reconstruction               0-001-029  09/16/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -26,876                  06/21/21   02/01/22    RLJ Electrical Corporation          
                                                            GC-03          43,048                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-04          31,684                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-07          12,812                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-08           1,808                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-09           6,762                  06/01/21   01/25/22    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-11           6,958                  04/09/21   06/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            PC-01           5,132                  06/17/21   02/08/22    Bertussi Contracting                
                                                            PC-02             501                  06/17/21   02/08/22    Bertussi Contracting                
                                                            PC-03           6,584                  06/17/21   03/22/22    Bertussi Contracting                
                                                            PC-04           4,126                  06/17/21   03/22/22    Bertussi Contracting                
                                                            PC-05           5,416                  06/17/21   03/22/22    Bertussi Contracting                
                                                            PC-06           2,568                  06/17/21   03/22/22    Bertussi Contracting                
                                                            PC-07          30,091                  06/17/21   03/22/22    Bertussi Contracting                
                                                            PC-08           3,108                  06/17/21   03/22/22    Bertussi Contracting Inc            
                                                            PC-11           1,839                  06/17/21   03/22/22    Bertussi Contracting                
                                                            PC-12          14,303                  06/17/21   03/22/22    Bertussi Contracting                
                                                            PC-13             774                  01/14/22   01/27/23    Bertussi Contr Inc                  
 
20-1868   Reconstruction               0-001-030  09/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1073   Reconstruction               0-001-031  01/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1949   Reconstruction               0-001-032  05/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pierre Van Cortlandt Middle School:
91-1504   Reconstruction               0-002-005  07/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1554   Reconstruction               0-002-006  09/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0160   Reconstruction               0-002-007  09/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0447   Reconstruction               0-002-008  01/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0825   Reconstruction               0-002-009  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1531   Reconstruction               0-002-010  06/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1215   Reconstruction               0-002-011  04/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0170   Additions and Alterations    0-002-012  11/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            011             6,324                  08/31/04   02/15/05    Edgebrook Construction Company,Inc. 
                                                            EC-01          11,700                  03/22/04   04/13/04    All Bright Electric                 
                                                            EC-02          13,500                  01/07/05   05/02/05    All Bright Electric                 
                                                            EC-04           6,354                  01/07/05     /  /      All Bright electric                 
                                                            GC-01          19,642                  10/30/03   11/05/03    Monpat Construction                 
                                                            GC-02           9,449                  01/29/04   02/17/04    Monpat Construction                 
                                                            GC-03               0                  03/22/04   04/06/04    Monpat Construction                 
                                                            GC-03               0                  01/29/09   05/27/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-04         122,591                  11/04/04     /  /      Monpat Construction                 
                                                            GC-05          25,011                  11/04/04   11/19/04    Monpat Construction                 
                                                            GC-06         109,250                  04/27/04   05/27/09    Monpat Construction                 
                                                            GC-06         109,250                  01/29/09     /  /      MONPAT CONSTRUCTION, INC.           
                                                            GC-07          18,734                  12/22/04   01/03/05    Monpat Construction                 
                                                            GC-08          12,871                  12/22/04   01/03/05    Monpat Construction                 
                                                            GC-09           8,786                  12/22/04   01/03/05    Monpat Construction                 
                                                            GC-10          -1,274                  01/07/05   01/25/05    Monpat Construction                 
                                                            GC-11          12,241                  12/22/04   01/03/05    Monpat Construction                 
                                                            GC-12          17,752                  01/07/05   11/08/05    Monpat Construction                 
                                                            GC-13          15,133                  12/22/04   01/03/05    Monpat Construction                 
                                                            GC-15          16,193                  01/29/09   05/27/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-16          18,887                  01/29/09   05/27/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-17            -854                  01/29/09   05/27/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-18          17,148                  01/29/09   04/03/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-19          14,635                  01/29/09   04/03/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-20          12,275                  03/18/09   05/26/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-21          10,585                  03/18/09   04/23/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-22          12,125                  03/18/09   04/23/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-23         -73,323                  03/18/09   04/23/09    MONPAT CONSTRUCTION, INC.           
                                                            GC-24           2,676                  03/18/09   04/23/09    MONPAT CONSTRUCTION, INC.           
                                                            HC-01          -3,950                  01/07/05   04/28/05    J&M Heating                         
 
00-1643   Reconstruction               0-002-013  07/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          -12,500                  10/30/02   10/30/02    Hygrade Insulators                  
                                                            GC-2           -1,800                  10/30/02   10/30/02    Hygrade Insulators                  
 
04-1257   Reconstruction               0-002-015  11/22/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1525   Reconstruction               0-002-017  08/11/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1412   Reconstruction               0-002-018  11/22/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -37,000                  12/20/12   03/14/13    HONEYWELL INTERNATIONAL INC         
 
10-1100   Reconstruction               0-002-019  05/03/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC2-001        11,841                  01/12/12   04/05/12    MARFI CONTRACTING CORP              
                                                            GC2-002        20,988                  01/12/12   04/05/12    MARFI CONTRACTING CORP              
                                                            GC2-003        -1,200                  06/11/12   11/09/12    MARFI CONTRACTING CORP              
 
10-1212   Reconstruction               0-002-020  05/13/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          7,770                  08/17/11     /  /      NIRAM INC                           
                                                            GC-003         -1,915                  01/12/12   03/16/12    NIRAM INC                           
                                                            GC-005         -6,750                  01/12/12   03/16/12    NIRAM INC                           
                                                            GC-4            2,770                  09/09/13   09/12/13    LECHASE CONST. SVCS                 
 
11-1151   Reconstruction               0-002-021  10/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CON2-002        3,285                  10/10/14   10/20/14    Caladri Development Corp            
                                                            CON2-003       15,480                  10/10/14   10/20/14    Caladri Developemnt Corp            
                                                            CON2-005       -6,800                  10/10/14   10/20/14    Caladri Development Corp            
                                                            CON2-008      -37,500                  02/02/16   02/08/16    CALADRI DEVELOPMENT CORP            
                                                            CON2-009      -49,200                  02/02/16   02/08/16    CALADRI DEVELOPMENT CORP            
                                                            GC-PVC01       -3,560                  03/31/16   04/12/16    Raw Power Electric Corp.            
 
14-0093   Reconstruction               0-002-022  02/25/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PVC-001        19,752                  04/05/16   04/12/16    Peal River Plumbing Heating & Electr
                                                            PVC-001             0                  04/05/16   04/12/16    PRPHE                               
                                                            PVC-002         4,859                  06/27/16   08/26/16    Pearl River Plumbing,Heating&Electr 
                                                            PVCX-003       -2,500                  03/01/17   04/13/17    Pearl River Plumbing, Heating & Elec
 
17-0396   Reconstruction               0-002-024  03/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-14           4,646                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            GC-13a          6,214                  03/11/19   03/12/19    KEY CONSTRUCTION SERVICES,LLC       
                                                            GC-16           8,624                  07/10/19   07/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            PC-01          11,517                  11/08/18   01/07/19    SOUTHEAST PLUMBING CORP.            
                                                            PC-02          -1,837                  01/16/19   02/25/19    SOUTHEAST PLUMBING CORP.            
                                                            SC-04           6,250                  12/20/18   01/29/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-05          10,627                  12/20/18   02/12/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-06           1,856                  05/09/19   05/10/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-07          -1,297                  05/09/19   05/10/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-11           5,949                  09/05/19   09/10/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-13          -5,000                  09/05/19   09/10/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-14            -229                  09/05/19   09/10/19    DEROSA SPORTS CONSTRUCTION, INC.    
 
19-0008   Reconstruction               0-002-025  09/16/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02         -10,063                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-05           2,400                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-06         -21,270                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-09a          4,103                  06/01/21   01/25/22    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-10         -95,000                  04/09/21   05/18/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-12           8,931                  05/13/21   05/24/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-13           6,925                  06/01/21   01/25/22    KEY CONSTRUCTION SERVICES, LLC      
                                                            HC-01          21,154                  06/01/21   08/27/21    MDS HVAC-R                          
                                                            HC-02          30,100                  06/01/21   08/27/21    MDS HVAC-R                          
                                                            HC-03         -49,695                  06/01/21   08/27/21    MDS HVAC-R Inc                      
                                                            PC-09           2,936                  06/17/21   03/22/22    Bertussi Contracting INC            
                                                            PC-10           7,221                  06/17/21   03/22/22    Bertussi Contracting                
 
18-1202   Reconstruction               0-002-026  02/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           3,754                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-02           4,016                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-04           1,500                  08/27/20   11/05/20    KEY CONSTRUCTION SERVICES, LLC      
 
20-1869   Reconstruction               0-002-027  09/20/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
22-1074   Reconstruction               0-002-028  01/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1950   Reconstruction               0-002-029  05/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2409SC Visual Structural Inspection 0-002-SC1  06/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Carrie E. Tompkins Elem.:
90-1838   Additions and Alterations    0-003-007  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1505   Reconstruction               0-003-008  07/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1506   Reconstruction               0-003-010  07/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0448   Additions and Alterations    0-003-012  01/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0823   Reconstruction               0-003-013  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1214   Reconstruction               0-003-014  04/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0133   Additions and Alterations    0-003-016  10/04/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          11,700                  01/15/10   02/17/10    ALL BRIGHT ELECTRIC                 
                                                            EC-02          16,347                  01/15/10   02/17/10    ALL BRIGHT ELECTRIC                 
                                                            GC-01          29,500                  03/22/04   04/06/04    Resilient Tech.                     
                                                            GC-01          -1,905                  01/29/09   04/03/09    FOURMEN CONSTRUCTION, INC.          
                                                            GC-02           5,350                  03/22/04   04/06/04    Fourmen Construction                
                                                            GC-03           3,356                  03/22/04   04/06/04    Fourmen Construction                
                                                            GC-04           2,266                  12/01/04   12/06/04    Fourmen Construction                
                                                            GC-05           2,065                  11/19/04   11/29/04    Fourmen Construction                
                                                            GC-06           3,621                  11/09/04   11/19/04    Fourmen Construction                
                                                            GC-07        -210,473                  11/04/04   11/19/04    Fourmen Construction                
                                                            GC-08           2,060                  01/29/09   04/03/09    FOURMEN CONSTRUCTION, INC..         
                                                            GC-09        -321,493                  01/07/05   01/25/05    Fourmen Construction                
                                                            GC-10         -15,135                  01/29/09   04/03/09    FOURMEN CONSTRUCTION, INC.          
                                                            GC-11          10,125                  01/29/09   04/03/09    FOURMAN CONSTRUCTION, INC.          
                                                            GC-12          13,500                  05/24/05   06/29/05    Fourmen Construction                
                                                            PC-01           6,087                  12/22/04   01/03/05    Wescon Plumbing                     
                                                            PC-01           6,087                  01/29/09     /  /      WESCON PLUMBING & HEATING           
                                                            PC-02             291                  11/04/04   11/29/04    Wescon Plumbing                     
                                                            PC-03          -4,681                  01/15/10   01/26/10    WESCON PLUMBING & HEATING           
                                                            PC-04           1,864                  01/15/10   01/26/10    WESCON PLUMBING & HEATING           
 
01-1416   Reconstruction               0-003-017  07/15/02  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1526   Reconstruction               0-003-020  08/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,462                  10/12/10   10/29/10    FOREMOST DEVELOPMENT 37             
                                                            2              -6,756                  12/10/10   02/11/11    FOREMOST DEVELOPMENT                
                                                            3              12,140                  02/18/11   05/04/11    FOREMOST DEVELOPMENT                
 
09-1413   Reconstruction               0-003-021  11/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1101   Reconstruction               0-003-023  05/03/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC3-001        17,242                  08/17/11   09/07/11    WB CONTRACTING CORP                 
                                                            GC3-002        -1,084                  01/12/12   04/05/12    WB CONTRACTING                      
                                                            GC3-003       -10,481                  08/28/12   12/14/12    WB CONTRACTING                      
 
11-1152   Reconstruction               0-003-024  10/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD2-03          1,296                  10/10/14   10/20/14    Caldri Development Corp.            
                                                            AD2CET1         4,400                  10/10/14   10/20/14    Caldri Development Corp.            
                                                            CON1-001       19,847                  10/10/14   10/16/14    Calardi Development Corp            
                                                            CON1-004       -1,336                  10/10/14   10/16/14    Caladri Development Corp            
                                                            CON1-005      -35,363                  02/02/16   02/08/16    CALADRI DEVELOPMENT CORP            
                                                            CON2-004        2,746                  10/10/14   10/20/14    Caladri Development Corp            
                                                            CON2-009      -49,033                  02/02/16   02/08/16    CALADRI DEVELOPMENT CORP            
                                                            GC-CET01       15,850                  06/11/13   07/03/14    Raw Power Electric Corp             
                                                            GC03 001            0                  06/11/13   07/03/14    Raw Power Electric Corp.            
 
14-0094   Reconstruction               0-003-025  02/25/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CES-001             0                  04/05/16   07/07/16    Clean Air Quality Service, Inc.     
                                                            CET-001         1,073                  04/05/16   04/12/16    Clean Air Quality Service, Inc.     
                                                            CET-001             0                  04/05/16   04/12/16    Clean Air Quality Service, Inc.     
                                                            CET-002             0                  04/05/16   04/12/16    Clean Air Quality Serivce, Inc.     
                                                            CET-002         3,377                  06/27/16   08/26/16    Clean Air Quailty Service, Inc.     
 
17-0397   Reconstruction               0-003-027  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,565                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-02           3,794                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-03           4,269                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-04           1,341                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-05             480                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-06             961                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-07             714                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-08           4,283                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-09          36,621                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-10           1,615                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-11          12,969                  11/08/18   01/07/19    HEALY ELECTRICAL CONTACTING, INC.   
                                                            EC-12           2,111                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-13           3,722                  11/08/18   01/07/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-15          26,229                  12/20/18   02/13/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-16           5,370                  01/16/19   02/25/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-19           1,129                  05/09/19   05/10/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-20           3,590                  09/05/19   09/10/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            GC-01         196,872                  11/08/18   01/03/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-02          -6,141                  11/08/18   01/03/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-03          44,355                  11/08/18   01/03/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-04          40,000                  11/08/18   01/03/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-05          30,000                  11/08/18   01/03/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-06          47,682                  11/08/18   01/03/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-08             551                  01/16/19   02/11/19    KEY CONSTRUCTION SERVICES, LLC.     
                                                            GC-13          16,859                  03/11/19   03/12/19    KEY CONSTRUCTION SERVICES,LLC       
                                                            GC-14           7,587                  01/16/19   02/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-15           2,394                  03/11/19   03/12/19    KEY CONSTRUCTION SERVICES,LLC       
                                                            GC-20           5,800                  10/04/19   10/28/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            MC-02           4,070                  03/11/19   03/14/19    CLEAN AIR QUALITY SERVICES, INC.    
                                                            MC-03          18,231                  09/05/19   09/10/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            SC-01          43,867                  11/08/18   01/03/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-02          20,000                  11/08/18   01/03/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-03          21,867                  12/20/18   02/12/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-08          -5,730                  05/09/19   05/10/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            SC-12          -5,000                  09/05/19   09/10/19    DEROSA SPORTS CONSTRUCTION, INC.    
 
17-0398   Reconstruction               0-003-028  02/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-21           1,051                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-22           4,073                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-23           1,451                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-24          16,361                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            EC-25           6,018                  12/04/19   12/11/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            GC-22           4,000                  11/06/19   11/08/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-26           8,227                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-27          -3,025                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-28           5,482                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC.     
                                                            GC-29             880                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC.     
                                                            GC-30           4,376                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC.     
                                                            GC-32           1,313                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC.     
                                                            GC-33           3,704                  12/04/19   12/11/19    KEY CONSTRUCTION SERVICES, LLC.     
                                                            MC-04           6,160                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MC-05           3,860                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MC-06           3,764                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MC-07           2,955                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MC-08             594                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MC-10           9,297                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MC-11          -3,704                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MC-9            4,197                  12/04/19   12/11/19    CLEAN AIR QUALITY SERVICE, INC.     
                                                            WC-02          13,800                  12/04/19   12/11/19    ARROW STEEL WINDOW CORP.            
                                                            WC-03          -3,750                  12/04/19   12/11/19    ARROW STEEL WINDOW CORP.            
                                                            WC-1          -26,500                  06/10/19   06/11/19    ARROW STEEL WINDOW CORP.            
 
19-0009   Reconstruction               0-003-029  09/16/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -19,181                  02/09/21   03/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-09B          5,387                  04/09/21   06/23/21    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-14          -1,109                  06/01/21   01/25/22    KEY CONSTRUCTION SERVICES, LLC      
 
18-1203   Reconstruction               0-003-030  02/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-03           5,863                  08/27/20   11/04/20    KEY CONSTRUCTION SERVICES, LLC      
 
20-1870   Reconstruction               0-003-031  09/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1075   Reconstruction               0-003-032  01/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1951   Reconstruction               0-003-033  05/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2410SC Visual Structural Inspection 0-003-SC1  06/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Office:
98-1791   New Construction             1-010-001  11/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1414   Reconstruction               1-010-002  11/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1102   Reconstruction               1-010-003  05/03/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1153   Reconstruction               1-010-004  10/26/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0399   Reconstruction               1-010-005  03/12/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-18           6,862                  05/09/19   05/10/19    HEALY ELECTRICAL CONTRACTING, INC.  
                                                            GC-07           2,785                  01/16/19   02/11/19    KEY CONSTRUCTION SERVICES, LLC.     
                                                            GC-09           2,048                  01/16/19   02/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-10           6,222                  01/16/19   02/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-11          -3,170                  01/16/19   02/11/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-13b          4,312                  03/11/19   03/12/19    KEY CONSTRUCTION SERVICES,LLC       
 
20-1871   Reconstruction               1-010-006  09/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1952   Reconstruction               1-010-007  05/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Bldg. @ C.E. Tompkins:
18-0586   New Construction             2-015-001  12/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building @ HS:
18-0587   New Construction             2-016-001  12/10/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Workshop/Maintenance Bldg.:
98-0112   New Construction             3-007-001  10/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
00-1750   Reconstruction               5-004-001  05/15/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            L-1             1,112                  06/19/02   06/19/02    Sun Up Ent.                         
                                                            L-2             9,237                  06/19/02   06/19/02    Sun Up Ent.                         
                                                            L-3             2,862                  06/19/02   06/19/02    Sun Up Ent.                         
                                                            L-4             8,177                  06/19/02   06/19/02    Sun Up Ent.                         
 
10-1103   Reconstruction               5-004-002  05/03/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0598   Additions and Alterations    5-004-003  09/06/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  08/10/15   08/26/15    Kramer Building Corp.               
                                                            GC-002              0                  08/10/15   08/26/15    Kraemer Building Corp.              
                                                            GC-003              0                  08/10/15   08/26/15    Kramer Building Corp.               
                                                            GC-004              0                  08/10/15   08/26/15    Kramer Building Corp.               
                                                            GC-005              0                  08/10/15   08/26/15    Kraemer Building Corp.              
                                                            GC-006              0                  08/10/15   08/26/15    Kramer Building Corp.               
                                                            GC-007              0                  08/10/15   08/26/15    Kramer Building Corp.               
                                                            X-001          -8,950                  08/10/15   08/26/15    Kramer Building Corp.               
                                                            X-002           1,475                  08/10/15   08/26/15    Kramer Building Corp.               
 
11-1154   Reconstruction               5-004-004  10/26/12  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1538   Reconstruction               5-004-005  05/04/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01         -26,310                  10/05/22   12/15/23    WD Exacvation&Contr                 
                                                            SC-02             600                  10/05/22   12/15/23    WD Exacation&Contr Inc              
 
20-1872   Reconstruction               5-004-006  09/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1076   Reconstruction               5-004-007  01/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1953   Reconstruction               5-004-008  05/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0462   Reconstruction               5-004-L01  12/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE

HENDRICK HUDSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-02-03-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
92-0032   Reconstruction               0-001-004  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0381   Reconstruction               0-001-005  12/13/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1475   Reconstruction               0-001-010  07/08/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1739   Reconstruction               0-001-011  03/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -4,000                  10/03/02   11/01/02    DeRosa                              
                                                            00001           6,300                  10/03/02   11/01/02    Precision Plumbing                  
                                                            00002         -15,000                  10/03/02   11/01/02    Precision Plumbing                  
 
98-1712   Reconstruction               0-001-012  09/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               2,290                  06/16/03   06/16/03    Castlton Environ.                   
 
99-1106   Reconstruction               0-001-013  10/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -16,500                  10/03/02   11/01/02    JSM Contracting                     
                                                            00001          -7,500                  10/03/02   12/02/02    Keyspan Home Energy Services        
                                                            00003           9,843                  10/03/02   11/01/02    JSM Contracting                     
                                                            00003          16,179                  10/03/02   11/01/02    Gabriel Contracting                 
                                                            00004         -66,827                  10/03/02   11/01/02    JSM Contracting                     
                                                            00005         -20,000                  10/03/02   12/20/02    Gabriel Contracting                 
                                                            00006          15,000                  10/03/02   11/01/02    JSM Contracting                     
                                                            00007          20,508                  10/03/02   11/01/02    Gabriel Contracting                 
                                                            00008               0                  10/03/02   11/01/02    Gabriel Contracting                 
                                                            00009           4,309                  10/03/02   11/01/02    Gabriel Contracting                 
                                                            00009           3,008                  10/03/02   12/16/03    JSM Contracting                     
                                                            00010           1,500                  10/03/02   11/01/02    Gabriel Contracting                 
                                                            00010          11,980                  10/03/02   11/01/02    JSM Contracting                     
                                                            00011           3,390                  10/03/02   12/05/03    JSM Contracting                     
                                                            00012           7,031                  10/03/02   12/20/02    JSM Contracting                     
                                                            00013           2,760                  10/03/02   12/20/02    JSM Contracting                     
 
02-0273   Additions and Alterations    0-001-014  04/18/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -27,343                  01/26/06   08/24/06    Beneway Incorp                      
                                                            00001         -26,984                  01/30/07   03/13/07    Richards Conditioning               
                                                            01-001          2,880                  10/21/03   10/23/03    Rok-Built Const.                    
                                                            01-002         -4,425                  01/30/07   02/22/07    Rok-Built Construction              
                                                            01-003        -29,804                  01/30/07   02/22/07    Rok-Built Construction              
                                                            04-001          2,817                  10/21/03   10/23/03    P&D Elec.                           
                                                            04-002        -10,250                  07/30/04   09/09/04    P&D Elec.                           
                                                            04-003        102,750                  12/16/05   03/22/07    P and D Electric                    
                                                            04-004         -3,413                  01/30/07   02/09/07    P and D Electric                    
                                                            05-001         13,300                  07/30/04   09/09/04    Northbrook Contracting              
                                                            05-002         17,953                  02/01/05   02/01/05    Northbrook Contracting              
                                                            05-003         19,000                  08/30/04   09/24/04    Northbrook Contracting              
                                                            05-004         14,028                  09/20/04   03/07/07    Northbrook Contracting              
                                                            05-005        -24,484                  01/30/07   02/22/07    Northbrook Contracting              
 
02-0061   Reconstruction               0-001-015  09/27/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0383   Reconstruction               0-001-016  03/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          27,000                  03/13/08   06/20/19    J & M Heating & Air Cond. Incorp.   
                                                            00004          17,311                  03/11/08   03/31/08    Piazza Brothers                     
                                                            00005          -6,730                  06/09/08   09/29/08    PIAZZA BROTHERS                     
                                                            01-006        -32,880                  06/09/08   08/26/08    PIAZZA BROTHERS                     
 
09-0869   Reconstruction               0-001-017  07/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1206   Reconstruction               0-001-018  06/08/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0426   Reconstruction               0-001-019  03/09/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          1,134                  04/21/11   05/13/11    D&M ELECTRICAL CONTRACTING INC      
                                                            EC-003          3,765                  04/21/11   05/13/11    D&M ELECTRICAL CONTRACTING INC      
                                                            EC-004              0                  04/21/11   05/13/11    D&M ELECTRICAL CONTRACTING INC      
                                                            EC-005          2,672                  04/21/11   05/13/11    D&M ELECTRICAL CONTRACTING INC      
                                                            GC-002         23,879                  02/04/11   03/02/11    NUA CONSTRUCTION CORP               
                                                            GC-003              0                  02/04/11   03/02/11    NUA CONSTRUCTION CORP               
                                                            GC-004        135,750                  02/04/11   03/02/11    NUA CONSTRUCTION CORP               
                                                            GC-005              0                  04/21/11   05/13/11    NUA CONSTRUCTION CORP               
                                                            GC-006          6,540                  04/21/11   05/13/11    NUA CONSTRUCTION CORP               
                                                            GC-007          2,180                  04/21/11   05/13/11    NUA CONSTRUCTION CORP               
                                                            GC-008          3,839                  04/21/11   05/13/11    NUA CONSTRUCTION CORP               
                                                            MC-001              0                  05/25/11   07/15/11    SOUTHEAST MECHANICAL CORP           
                                                            MC-002         20,164                  05/25/11   09/13/11    SOUTHEAST MECHANICAL CORP           
                                                            PC-001         32,688                  02/04/11   03/02/11    DP WOLFF INC                        
                                                            PC-002        -10,000                  04/21/11   05/13/11    DP WOLFF INC                        
 
11-1367   New Construction             0-001-020  06/18/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0856   Reconstruction               0-001-021  03/26/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0473   Reconstruction               0-001-022  09/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0178   Reconstruction               0-001-023  04/21/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AX-001              0                  04/05/16   04/12/16    Peal River Plumbing, Heating & Elect
 
14-1403   Reconstruction               0-001-024  07/29/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1043   Reconstruction               0-001-025  04/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              17,557                  04/07/22   02/13/23    DeRosa Sports Const Inc             
                                                            2               4,009                  04/07/22   02/13/23    DeRosa Sports Const Inc             
                                                            3              18,947                  04/07/22   02/13/23    DeRosa Sports Const Inc             
                                                            GC-03         -47,015                  04/07/22   02/13/23    RENU Contr&Restore                  
                                                            GC-10         -19,483                  04/07/22   02/13/23    RENU Contr&Restore                  
 
19-0379   Reconstruction               0-001-026  01/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          6,116                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-01          19,810                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-010          8,548                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-011          4,818                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-012          8,905                  04/07/22     /  /      Naber Elec Corp                     
                                                            EC-013          7,188                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-014         17,377                  04/07/22     /  /      Naber Elec Corp                     
                                                            EC-015          2,910                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-016          3,585                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-017        163,927                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-018        103,307                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-03          11,467                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-04          15,000                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-05           4,476                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-06           3,705                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-07           5,717                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-08           4,125                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            EC-09           4,314                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            GC-001         54,334                  03/15/23   12/18/23    ENU CONTRACTING & RESTORATION       
                                                            GC-01          54,334                  04/07/22     /  /      RENU Contr&Restore                  
                                                            GC-02           7,500                  04/07/22   02/08/23    RENU Contr&Restore                  
                                                            MC-001         67,268                  04/07/22   03/07/23    ABM Air Cond&Heat                   
                                                            MC-002          9,995                  04/07/22   03/07/23    ABM Air Cond&Heat                   
                                                            PC-001          9,976                  04/07/22   03/07/23    S&L Plumb&Heat                      
 
02-0156FP Reconstruction               0-001-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          F.G. Lindsey Elementary:
91-0165   Reconstruction               0-002-004  09/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0033   Reconstruction               0-002-005  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1713   Reconstruction               0-002-006  09/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,580                  06/16/03   06/16/03    Castlton Environ.                   
                                                            3              24,690                  06/16/03   06/16/03    Castlton Environ.                   
                                                            4              55,227                  06/16/03   06/16/03    Castlton Environ.                   
                                                            5              22,470                  06/16/03   06/16/03    Castlton Environ.                   
 
98-1571   Reconstruction               0-002-007  11/22/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -7,500                  10/03/02   12/02/02    Keyspan                             
                                                            00002           6,469                  10/17/02   01/07/03    JSM Contracting                     
                                                            00002          10,210                  10/17/02   12/02/02    Gabriel Contracting                 
                                                            00005           1,280                  10/17/02   01/07/03    JSM Contracting                     
                                                            00005         -11,500                  12/19/02   12/20/02    Gabriel Contracting                 
                                                            00007           3,450                  10/17/02   01/07/03    JSM Contracting                     
                                                            00008           1,991                  10/17/02   01/07/03    JSM Contracting                     
                                                            00012           4,687                  12/19/02   12/20/02    JSM Contracting                     
                                                            00013           2,033                  12/19/02   12/20/02    JSM Contracting                     
                                                            4             -13,873                  10/03/02   11/01/02    JSM Contracting                     
                                                            9                 626                  10/03/02   12/16/03    JSM Contracting                     
 
03-1027   Reconstruction               0-002-008  04/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1473   Reconstruction               0-002-009  07/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -14,329                  06/26/06   07/05/06    Beneway                             
                                                            00001          -1,944                  01/26/06   07/05/06    FA Burchetta Co                     
                                                            00001        -139,755                  01/30/07   03/20/07    TDT inc                             
 
06-0384   Additions and Alterations    0-002-011  03/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          11,626                  09/11/07   12/13/07    PIAZZIA BROTHERS                    
                                                            00001           6,563                  11/16/07   02/23/08    FA Burcheetta                       
                                                            00002          -2,064                  09/16/08   12/03/08    FA BURCHETTA                        
 
08-1207   Reconstruction               0-002-012  06/09/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0427   Reconstruction               0-002-013  03/09/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0870   Reconstruction               0-002-014  07/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0857   Reconstruction               0-002-016  03/26/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0474   Reconstruction               0-002-017  09/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0179   Reconstruction               0-002-018  04/21/15  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1593   Reconstruction               0-002-019  07/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1404   Reconstruction               0-002-020  07/29/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1328   Reconstruction               0-002-021  04/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1044   Reconstruction               0-002-022  04/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0380   Reconstruction               0-002-023  01/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5-GC          -11,132                  04/07/22   02/08/23    RENU CONTRACTING &                  
                                                            EC-02         -12,500                  05/23/22   04/05/23    AGV Elec Contrg LLC                 
                                                            GC-004         25,337                  04/07/22   02/13/23    RENU CONTRACTING                    
                                                            GC-009         11,132                  04/07/22     /  /      RENU Contr&Restore                  
                                                            PC-01          -1,600                  04/07/22     /  /      S&L Plumb&Heat                      
 
02-0157FP Reconstruction               0-002-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Furnace Woods Elementary:
91-0166   Additions and Alterations    0-006-001  09/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1714   Reconstruction               0-006-002  09/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1060   Reconstruction               0-006-003  04/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00012             937                  10/03/02   12/20/02    JSM Contracting                     
                                                            00013           4,384                  10/03/02   12/20/02    JSM Contracting                     
                                                            4              -8,109                  10/03/02   11/01/02    JSM Contracting                     
                                                            9                 364                  10/03/02   12/16/03    JSM Contracting                     
 
03-0882   Reconstruction               0-006-004  03/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -22,109                  06/27/07   06/29/07    Construction Services               
 
03-1475   Reconstruction               0-006-005  07/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001           7,800                  09/11/06   03/07/07    J and M Heating and Air Cond        
                                                            00001          -5,000                  01/22/07   03/07/07    Alert Action                        
                                                            00001          -1,871                  01/22/07   03/07/07    S & L Plumbing                      
                                                            00001          -2,616                  01/22/07   03/07/07    RLJ Electric                        
                                                            00002          21,538                  09/11/06   03/07/07    J and M heating and Air Cond        
                                                            00002          11,137                  05/22/07   08/15/07    S and L Plumbing heating            
                                                            00003         -18,397                  04/12/07   04/17/07    J and M Heating                     
 
03-1028   Reconstruction               0-006-006  04/13/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -12,814                  01/22/07   03/07/07    Puff Inc                            
 
06-0385   Additions and Alterations    0-006-007  03/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00002          75,900                  10/17/07   10/23/07    PIAZZA BROTHERS                     
                                                            00003          15,400                  11/16/07   11/26/07    Piazza Brothers                     
                                                            00005          -6,730                  06/09/08   09/29/08    PIAZZA BROTHERS                     
 
08-1208   Reconstruction               0-006-008  06/09/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0428   Reconstruction               0-006-009  03/09/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -8,982                  04/21/11   05/13/11    D&M ELECTRICAL CONTRACTING INC      
 
09-0871   Reconstruction               0-006-010  07/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0475   Reconstruction               0-006-013  09/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0707   Reconstruction               0-006-014  02/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0180   Reconstruction               0-006-015  04/21/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AX-002         12,727                  07/06/16   09/30/16    Peal River Plumbing, Heating & Elect
 
13-1594   Reconstruction               0-006-016  07/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1405   Reconstruction               0-006-017  07/29/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1329   Reconstruction               0-006-018  04/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1045   Reconstruction               0-006-019  04/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          8,153                  04/07/22   05/04/23    AGV Elec Contrg LLC                 
                                                            GC-006        -15,217                  04/07/22     /  /      RENU Contr&Restore                  
 
19-0381   Reconstruction               0-006-020  01/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-001          2,072                  04/07/22   03/07/23    MDS HVAC-R Inc                      
                                                            PC-01          -2,500                  04/07/22   03/07/23    S&L Plumb&Heat                      
 
02-0154FP Reconstruction               0-006-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Blue Mountain Middle School:
92-0034   Reconstruction               0-007-002  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0035   Additions and Alterations    0-007-003  11/03/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          10,122                  10/23/02   12/02/02    Dutchess Mech.                      
                                                            00001           1,982                  10/23/02   12/02/02    Fourmen Construction                
                                                            00001           7,800                  12/17/02   01/09/03    FA Burchetta Co                     
                                                            00001           2,365                  12/17/02   01/09/03    Richards Conditioning               
                                                            00002           6,445                  10/23/02   12/02/02    Dutchess Mech.                      
                                                            00002          41,129                  10/23/02   12/02/02    Fourmen Construction                
                                                            00002           4,998                  12/17/02   01/09/03    FA Burchetta Co                     
                                                            00002          15,060                  12/17/02   01/09/03    Richards Conditioning               
                                                            00003          18,495                  10/23/02   12/02/02    Dutchess Mech.                      
                                                            00003               0                  10/23/02   12/02/02    Fourmen Construction                
                                                            00003          10,395                  11/20/02   05/01/03    FA Burchetta Co                     
                                                            00003           7,182                  12/17/02   01/09/03    Richard Conditioning                
                                                            00004          20,198                  02/03/03   02/03/03    Dutchess Mech.                      
                                                            00004           3,874                  10/23/02   01/15/03    Fourmen Construction                
                                                            00004             243                  11/20/02   12/02/02    FA Burchetta Co                     
                                                            00005          17,214                  10/23/02   12/02/02    Fourmen Construction                
                                                            00005             900                  11/20/02   12/02/02    FA Burchetta Co                     
                                                            00006           6,197                  10/23/02   12/02/02    Fourmen Construction                
                                                            00006           7,068                  11/20/02   12/02/02    FA Burchetta Co                     
                                                            00007           9,063                  10/23/02   12/02/02    Fourmen Construction                
                                                            00007           2,606                  11/20/02   12/02/02    FA Burchetta Co                     
                                                            00008          16,207                  10/23/02   01/15/03    Fourmen Construction                
                                                            00008           4,078                  11/20/02   12/02/02    FA Burchetta Co                     
                                                            00009          13,738                  11/20/02   05/22/03    FA Burchetta Co                     
                                                            00009           2,441                  12/17/02   01/09/03    Fourmen Construction                
                                                            00010           1,069                  11/20/02   12/02/02    FA Burchetta Co                     
                                                            00011           2,969                  11/20/02   03/28/03    FA Burchetta Co                     
                                                            00012           9,076                  11/20/02   05/01/03    FA Burchetta Co                     
                                                            00013           9,992                  11/20/02   05/01/03    FA Burchetta Co                     
                                                            00014             989                  11/20/02   12/02/02    FA Burchetta Co                     
 
98-1715   Reconstruction               0-007-005  09/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1029   Reconstruction               0-007-006  04/13/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -25,000                  03/05/07   11/30/07    Puff inc                            
                                                            00001          11,000                  03/05/07   11/30/07    RLJ electric                        
                                                            00001         -25,000                  01/22/07   11/30/07    Puff inc                            
                                                            0001          -11,000                  03/05/07   03/07/07    RLJ Electric                        
 
03-0883   Reconstruction               0-007-007  03/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -18,409                  06/27/07   06/29/07    Construction Services               
 
03-1476   Reconstruction               0-007-008  07/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001            -565                  01/22/07   03/07/07    S and L Plumbing                    
                                                            00001          -7,959                  01/22/07   03/07/07    RLJ Electric                        
                                                            00001         -10,813                  01/22/07   03/07/07    Puff Inc.                           
                                                            00003          -1,218                  04/12/07   04/17/07    J and M Heating                     
 
09-0429   Reconstruction               0-007-009  03/09/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0872   Reconstruction               0-007-010  07/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1172   Reconstruction               0-007-011  06/07/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0476   Reconstruction               0-007-014  09/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0708   Reconstruction               0-007-015  02/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0181   Reconstruction               0-007-016  04/21/15  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1595   Reconstruction               0-007-017  07/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1406   Reconstruction               0-007-018  07/29/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1330   Reconstruction               0-007-019  04/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1046   Reconstruction               0-007-020  04/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0382   Reconstruction               0-007-021  01/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-005         10,647                  04/07/22   02/07/23    RENU Contr&Restore                  
                                                            PC-01          -2,500                  04/07/22   03/07/23    S&L Plumb&Heat                      
 
02-0158FP Reconstruction               0-007-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Buchanan-Verplanck Elementary:
92-0035   Reconstruction               0-008-003  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0189   Additions and Alterations    0-008-004  10/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1716   Reconstruction               0-008-005  09/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6               1,500                  06/16/03   06/16/03    Castlton Environ.                   
 
99-1063   Reconstruction               0-008-006  04/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          19,500                  10/03/02   11/01/02    Gabriel Contracting                 
                                                            00005          -7,000                  10/03/02   12/20/02    Gabriel Contracting                 
                                                            00006          -2,000                  10/03/02   11/01/02    Gabriel Contracting                 
                                                            00012           2,344                  10/03/02   12/20/02    JSM Contracting                     
                                                            00013           5,137                  10/03/02   12/20/02    JSM Contracting                     
                                                            4              -8,891                  10/03/02   11/01/02    JSM Contracting                     
                                                            9                 399                  10/03/02   12/16/03    JSM Contracting                     
 
03-0884   Reconstruction               0-008-007  03/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -9,604                  06/27/07   06/29/07    Construction Services               
 
03-1477   Reconstruction               0-008-008  07/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -3,124                  01/30/07   03/09/07    TDT Inc                             
                                                            00002         -71,736                  07/09/07   07/09/07    J and M heating Air Conditioner     
 
03-1030   Reconstruction               0-008-009  04/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1209   Reconstruction               0-008-010  06/09/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0873   Reconstruction               0-008-012  07/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1368   Reconstruction               0-008-013  06/18/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0858   Reconstruction               0-008-014  03/26/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0477   Reconstruction               0-008-015  09/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0182   Reconstruction               0-008-016  04/21/15  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1596   Reconstruction               0-008-017  07/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1407   Reconstruction               0-008-018  07/29/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1047   Reconstruction               0-008-019  04/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          -1,800                  04/07/22   03/07/23    S&L Plumb&Heat                      
 
19-0383   Reconstruction               0-008-020  01/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           3,042                  04/07/22   03/07/23    AGV Elec Contr LLC                  
                                                            GC-008          5,000                  04/07/22   02/07/23    RENU Contr&Restore                  
                                                            GC-07           3,514                  04/07/22     /  /      RENU Contr&Restore                  
                                                            PC-01          -1,600                  04/07/22   03/07/23    S&L Plumb&Heat                      
 
22-0035   Reconstruction               0-008-022  03/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0155FP Reconstruction               0-008-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg:
92-0036   Reconstruction               1-004-002  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0592   Reconstruction               1-004-003  07/31/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           2,593                  10/03/02   11/01/02    Cali Bros.                          
                                                            00001          -3,000                  10/03/02   11/01/02    TSJ Environ. Industries             
                                                            00001           1,654                  10/23/02   06/30/04    Dutchess Mech.                      
                                                            00001          17,198                  10/23/02   04/23/04    JSM Contracting                     
                                                            00002           2,687                  10/03/02   11/01/02    Cali Bros.                          
                                                            00002           1,878                  10/23/02   12/02/02    JSM Contracting                     
                                                            00003             647                  10/03/02   11/01/02    Cali Bros.                          
                                                            00003           5,923                  10/23/02   12/02/02    JSM Contracting                     
                                                            00004           3,999                  10/03/02   11/01/02    Cali Bros.                          
                                                            00005           1,138                  10/03/02   11/01/02    Cali Bros.                          
                                                            00006           5,680                  10/03/02   11/01/02    Cali Bros.                          
                                                            00007           2,811                  10/03/02   11/01/02    Cali Bros.                          
                                                            00008               0                  10/03/02   11/01/02    Cali Bros.                          
                                                            00009          -1,298                  10/23/02   12/02/02    Cali Bros.                          
                                                            00010          -2,105                  10/23/02   01/15/03    Cali Bros.                          
 
03-1474   Reconstruction               1-004-004  07/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -1,373                  01/22/07   03/07/07    Puff Inc.                           
                                                            00001            -425                  01/22/07   03/07/07    RJL Electric                        
                                                            00003         -13,895                  04/12/07   04/17/07    J and M Heating                     
 
06-0386   Reconstruction               1-004-006  03/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0874   Reconstruction               1-004-008  07/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0183   Reconstruction               1-004-009  04/21/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0384   Reconstruction               1-004-010  01/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003        -10,089                  05/23/22   04/05/23    AGV Elec Contrg LLC                 
 

          Storage Building @ High School:
98-1570   New Construction             2-009-001  10/27/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Building:
18-1020   New Construction             3-011-001  04/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-001         -3,059                  04/07/22   03/07/23    Naber Elec Corp                     
                                                            GC-001         86,407                  03/15/23   12/18/23    SPORT TECH CONST                    
                                                            GC-001         86,407                  04/07/22     /  /      Sport Tech Const                    
                                                            GC-002          3,986                  04/07/22   02/13/23    Sport Tech Const                    
                                                            GC-003         12,127                  04/07/22   02/13/23    Sport Tech Const                    
                                                            GC-004         12,863                  04/07/22   02/13/23    Aport Tech Const                    
                                                            GC-005          3,024                  04/07/22   02/13/23    Aport Tech Const                    
                                                            GC-006          2,457                  04/07/22   02/13/23    Sport Tech Const                    
                                                            GC-007          2,315                  04/07/22   02/13/23    Sport Tech Const                    
                                                            PC-001          9,976                  04/07/22   03/07/23    S&L Plumb&Heat                      
                                                            PC-002          6,362                  04/07/22   03/07/23    TWP Plumb&Heat Inc                  
                                                            PC-003          2,579                  04/07/22   03/07/23    TWP Plumb&Heat Inc                  
                                                            PC-004          5,541                  04/07/22   03/07/23    TWP Plumb&Heat Inc                  
 

          Bus Garage:
92-0037   Reconstruction               5-005-001  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1572   Reconstruction               5-005-002  08/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         141,976                  06/16/03   06/16/03    Ira Conklin                         
                                                            00002           2,798                  06/16/03   06/16/03    Ira Conklin                         
 
99-0593   Reconstruction               5-005-003  07/31/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0106   Reconstruction               5-005-004  03/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001        -112,556                  05/21/07   05/24/07    Beneway incorp                      
                                                            00001         -34,417                  06/27/07   06/29/07    Construction Services               
 
09-0430   Reconstruction               5-005-005  03/09/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0875   Reconstruction               5-005-006  07/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0184   Reconstruction               5-005-007  04/21/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0385   Reconstruction               5-005-008  01/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
96-0758   Reconstruction               7-999-001  02/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1407   Reconstruction               7-999-002  05/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  02/04/11   03/02/11    FILINGERI ELECTRIC                  
                                                            EC-02           5,572                  02/04/11   03/04/11    FILINGERI ELECTRIC                  
                                                            EC-03          -3,049                  04/21/11   05/13/11    FILINGERI ELECTRIC                  
                                                            EC-04           9,000                  04/21/11   05/13/11    FILINGERI ELECTRIC                  
 
13-1006   Reconstruction               7-999-003  01/27/14  NO CHANGE ORDERS ON ELECTRONIC FILE

EASTCHESTER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-01-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Anne Hutchinson Elementary School:
91-0297   Reconstruction               0-001-007  11/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1009   Reconstruction               0-001-008  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0221   Reconstruction               0-001-009  12/20/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1022   Reconstruction               0-001-011  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1272   Additions and Alterations    0-001-013  07/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0090   Reconstruction               0-001-014  08/06/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,000                  09/26/05   08/31/10    SUBURBAN RESTORATION CO INC         
 
07-1671   Reconstruction               0-001-015  05/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02              7,691                  12/22/09   02/18/10    TALT ELECTRIC                       
 
11-0345   Reconstruction               0-001-016  04/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0163   Reconstruction               0-001-017  09/28/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            13,500                  08/31/12   12/14/12    A.B.C.D. CONSTRUCTION CORPORATION   
                                                            002             2,258                  12/03/12   03/08/13    A.B.C.D. CONSTRUCTION CORPORATION   
 
13-1488   Reconstruction               0-001-018  04/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             8,800                  03/02/15   03/23/15    Empire Engery Specialist            
 
15-1578   Reconstruction               0-001-019  04/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1192   Reconstruction               0-001-020  06/19/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC03AHES       65,296                  03/05/18   03/13/18    Mengler Mechanical, Inc.            
 
19-0727   Reconstruction               0-001-021  02/20/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01                  0                  09/04/20   11/05/20    FRAMAN MECHANICAL, INC.             
                                                            02            -33,553                  09/04/20   11/05/20    FRAMAN MECHANICAL, INC.             
                                                            03             27,196                  09/04/20   11/05/20    FRAMAN MECHANICAL, INC.             
                                                            04              3,213                  09/04/20   11/05/20    FRAMAN MECHANICAL, INC.             
                                                            05              1,287                  09/04/20   11/05/20    FRAMAN MECHANICAL, INC.             
                                                            06              1,867                  09/04/20   11/05/20    FRAMAN MECHANICAL, INC.             
                                                            07              5,857                  12/10/20   02/24/21    FRAMAN MECHANICAL, INC.             
                                                            08              3,479                  12/10/20   02/24/21    FRAMAN MECHANICAL, INC.             
 
22-0238   Reconstruction               0-001-022  12/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0076   Reconstruction               0-001-023  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1403SC Visual Structural Inspection 0-001-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Waverly School:
92-1010   Reconstruction               0-002-002  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1027   Reconstruction               0-002-004  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0160   Additions and Alterations    0-002-005  05/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1.1         1,142,013         171,301  03/19/04   04/27/05    Kenstar Const.                      
                                                            1.11              382                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.12            6,440                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.13           14,137                  06/01/04   06/18/04    Kenstar Const.                      
                                                            1.14            3,668                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.15W             880                  06/01/04   06/21/04    Kenstar Const.                      
                                                            1.16            6,987                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.17            4,124                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.2            43,055           6,458  03/19/04   04/27/05    Kenstar Const.                      
                                                            1.21            2,957                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.24           41,233                  06/01/04   06/18/04    Kenstar Const.                      
                                                            1.24           41,233                  08/09/04   08/13/04    Kenstar Const.                      
                                                            1.25           -3,152                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.26            1,735                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.27           10,743                  06/01/04   06/18/04    Kenstar Const.                      
                                                            1.27           10,743                  08/09/04   08/13/04    Kenstar Const.                      
                                                            1.28           19,423                  06/01/04   06/18/04    Kenstar Const.                      
                                                            1.28           19,423                  08/09/04   08/13/04    Kenstar Const.                      
                                                            1.29            5,396                  06/01/04   06/18/04    Kenstar Const.                      
                                                            1.29            5,396                  08/09/04   08/13/04    Kenstar Const.                      
                                                            1.3           114,932           9,567  03/19/04   04/27/05    Kenstar Const.                      
                                                            1.31            5,500                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.33           43,959                  06/01/04   06/18/04    Kenstar Const.                      
                                                            1.35            3,145                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.36           17,142                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.38            6,516                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.42           13,281                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.43              939                  02/11/05   03/14/05    Kenstar Construction Corp           
                                                            1.5          -339,990                  03/19/04   03/22/04    Kenstar Const.                      
                                                            1.6             1,989                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.8             4,616                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.9              -500                  06/01/04   06/07/04    Kenstar Const.                      
                                                            2-9             5,884                  02/11/05   04/01/05    Sand L Plumbing Heating             
                                                            2.1             5,314                  03/19/04   06/18/04    S&L Plumbing                        
                                                            2.2             4,472                  03/19/04   03/19/04    S&L Plumbing                        
                                                            2.3            -2,656                  06/01/04   06/07/04    S&L Plumbing                        
                                                            2.4             6,735                  06/01/04   06/07/04    S&L Plumbing                        
                                                            2.5             4,357                  06/01/04   06/07/04    S&L Plumbing                        
                                                            2.6               960                  06/01/04   06/07/04    S&L Plumbing                        
                                                            3-14           20,220                  02/11/05   03/14/05    DP Wolff Inc                        
                                                            3-15            2,815                  02/11/05   03/14/05    DP Wolff Inc                        
                                                            3.10            8,365                  06/01/04   06/07/04    DP Wolff                            
                                                            3.12            6,503                  08/09/04   08/13/04    DP Wolff                            
                                                            3.3             5,340                  06/01/04   06/18/04    DP Wolff                            
                                                            3.5             4,623                  06/01/04   06/07/04    DP Wolff                            
                                                            3.6W            2,979                  06/01/04   06/07/04    DP Wolff                            
                                                            3.7             5,757                  06/01/04   06/07/04    DP Wolff                            
                                                            4-6             1,455                  02/11/05   03/14/05    Talt Electric                       
                                                            4-7             1,696                  02/11/05   03/14/05    Talt Electric                       
                                                            4.2W            3,829                  06/01/04   06/07/04    Talt Elec.                          
                                                            4.3           -31,385                  08/09/04   08/13/04    Talt Elec.                          
                                                            4.8             3,275                  03/15/07   03/16/07    Talt Electric                       
                                                            5.3            12,759                  08/09/04   08/13/04    Suburban Restoration                
                                                            6-6            64,502                  02/11/05   03/14/05    ELQ industries                      
                                                            6-8            11,500                  02/11/05   03/14/05    ELQ industries                      
                                                            6-9            15,000                  02/11/05   03/14/05    ELQ Industries                      
                                                            6.1W           16,949                  06/01/04   06/07/04    ELQ Industries                      
                                                            6.2             1,778                  06/01/04   06/07/04    ELQ Industries                      
                                                            6.3             4,425                  06/01/04   06/21/04    ELQ Industries                      
                                                            6.4            12,975                  06/01/04   06/21/04    ELQ Industries                      
 
07-1672   Reconstruction               0-002-006  05/07/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0346   Reconstruction               0-002-007  04/13/12  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1193   Reconstruction               0-002-008  06/19/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1195   Reconstruction               0-002-009  02/27/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0174   Reconstruction               0-002-010  11/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC01-001        5,912                  10/10/19   10/18/19    MENGLER MECHANICAL, INC.            
                                                            MC01-002        3,958                  10/10/19   10/18/19    MENGLER MECHANICAL INC.             
 
22-0239   Reconstruction               0-002-011  12/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1401SC Visual Structural Inspection 0-002-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Eastchester Middle/High School:
92-1011   Reconstruction               0-003-005  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1157   Reconstruction               0-003-007  04/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1402   Reconstruction               0-003-008  06/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1700   Reconstruction               0-003-009  07/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1076   Additions and Alterations    0-003-012  06/01/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,150                  09/13/01   01/08/02    DP Wolff                            
 
99-1023   Reconstruction               0-003-014  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0091   Reconstruction               0-003-016  08/06/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0956   Reconstruction               0-003-017  03/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004            17,968                  06/16/08   09/29/08    Milcon Construction                 
                                                            005             8,327                  06/16/08   08/10/08    Milcon Construction                 
                                                            006               860                  06/16/08   09/29/08    Milcon Construction                 
 
07-1673   Reconstruction               0-003-018  05/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01B             3,632                  12/22/09   02/18/10    TALT ELECTRIC                       
                                                            03              4,948                  12/22/09   02/18/10    TALT ELECTRIC                       
 
07-2283   Reconstruction               0-003-019  06/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            11,000                  11/10/08   04/14/09    ACOCELLA CONTRACTING, INC.          
 
11-0347   Reconstruction               0-003-022  04/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1172   Reconstruction               0-003-023  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            Field001        9,655                  09/12/14   09/24/14    DeRosa Sports Construction, Inc.    
                                                            Field002       24,000                  12/22/14   01/12/15    DeRosa Sports Construction, Inc.    
                                                            GC-001         17,850                  10/16/15   11/17/15    GCC Contracting Corp.               
                                                            GC-002         26,758                  10/16/15   11/17/15    GCC Contracting Corp.               
 
15-1579   Reconstruction               0-003-024  04/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0191   Reconstruction               0-003-025  05/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-001         47,441                  10/22/18   11/09/18    Nari Construction, LLC              
                                                            EC-001        -22,000                  09/18/17   06/17/19    All Bright Electric                 
                                                            EC-002          1,933                  12/04/17   06/01/18    All Bright Electric                 
                                                            EC-003        -25,000                  12/04/17   06/01/18    All Bright Electric                 
                                                            EC-004          5,805                  03/05/18   05/21/18    All Bright Electric                 
                                                            EC-005        110,290                  09/17/18   10/15/18    ALL BRIGHT ELECTRIC                 
                                                            EC-006          4,491                  05/03/19   05/06/19    ALL BRIGHT ELECTRIC                 
                                                            EC-007         -3,307                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            EC-008          2,356                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            EC-009         13,982                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            EC-010          2,775                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            EC-011          2,892                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            EC-012          1,061                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            EC-013        -20,061                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            EC-014         66,900                  06/17/19   06/19/19    ALL BRIGHT ELECTRIC                 
                                                            FC-001        -10,000                  07/16/18   07/31/18    TRISTATE CONTRACT SALES LLC         
                                                            FC-002         10,097                  01/22/19   02/25/19    TRISTATE CONTRACT SALES, LLC        
                                                            FC-003          4,318                  02/06/19   02/27/19    TRISTATE CONTRACT SALES,LLC         
                                                            FC-004         18,809                  02/06/19   02/27/19    TRISTATE CONTRACT SALES,LLC         
                                                            FP-001        -15,000                  12/04/17   06/01/18    L.J. Coppola, Inc.                  
                                                            FP-002          9,333                  04/01/19   04/05/19    L.J. COPPOLA, INC.                  
                                                            FP-003         25,361                  11/05/18   11/26/18    L.J.COPPOLA INC                     
                                                            GC-001         50,821                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-002         30,699                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-003          4,729                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-004         15,558                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-005         36,379                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-006          1,760                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-007          9,495                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-008          3,718                  09/18/17   10/18/17    Piazza, Inc.                        
                                                            GC-009         22,374                  11/03/17   12/14/17    Piazza, Inc.                        
                                                            GC-010          1,777                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-011          8,580                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-012          2,469                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-013         75,074                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-014          4,401                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-015         13,317                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-016         25,127                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-017         78,723                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-018          9,000                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-019         18,004                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-020         17,695                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-021          4,916                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-022          9,452                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-023          2,198                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-024          3,746                  12/04/17   09/02/20    Piazza, Inc.                        
                                                            GC-025        -75,000                  12/04/17   12/14/17    Piazza, Inc.                        
                                                            GC-026          2,976                  12/04/17   12/15/17    Piazza, Inc.                        
                                                            GC-027         11,726                  12/04/17   12/15/17    Piazza, Inc.                        
                                                            GC-028         66,675                  12/04/17   12/15/17    Piazza Inc.                         
                                                            GC-029          2,294                  04/02/18   04/18/18    Piazza, Inc.                        
                                                            GC-030         58,653                  04/02/18   04/18/18    Piazza, Inc.                        
                                                            GC-031          2,832                  04/02/18   04/18/18    Piazza, Inc.                        
                                                            GC-032          9,552                  04/02/18   04/18/18    Piazza, Inc.                        
                                                            GC-033          1,041                  04/02/18   04/18/18    Piazza, Inc.                        
                                                            GC-034          8,101                  04/02/18   04/18/18    Piazza, Inc.                        
                                                            GC-035          6,556                  06/04/18   07/06/18    PIAZZA, INC.                        
                                                            GC-036          5,237                  06/04/18   07/06/18    PIAZZA, INC.                        
                                                            GC-037         28,646                  06/04/18   07/06/18    PIAZZA, INC.                        
                                                            GC-038         21,086                  06/04/18   07/06/18    PIAZZA, INC.                        
                                                            GC-039          1,489                  06/04/18   07/06/18    PIAZZA, INC.                        
                                                            GC-040          1,255                  06/04/18   07/06/18    PIAZZA, INC.                        
                                                            GC-041          2,251                  06/04/18   07/06/18    PIAZZA, INC.                        
                                                            GC-042         38,935                  07/16/18   07/31/18    PIAZZA INC                          
                                                            GC-043          4,487                  07/16/18   07/31/18    PIAZZA INC                          
                                                            GC-044         29,162                  07/16/18   07/31/18    PIAZZA INC                          
                                                            GC-045          5,551                  07/16/18   07/31/18    PIAZZA INC                          
                                                            GC-046         15,505                  04/01/19   04/05/19    PIAZZA,INC.                         
                                                            GC-047         24,000                  07/16/18   07/31/18    PIAZZA INC                          
                                                            GC-048R         8,000                  11/05/18   11/15/18    PIAZZA INC                          
                                                            GC-049R        53,113                  11/05/18   11/15/18    PIAZZA INC                          
                                                            GC-050         25,822                  11/05/18   11/15/18    PIAZZA INC                          
                                                            GC-051         12,141                  11/05/18   11/15/18    PIAZZA INC                          
                                                            GC-052          9,495                  11/05/18   11/15/18    PIAZZA INC                          
                                                            GC-053          2,447                  11/05/18   11/15/18    PIAZZA INC                          
                                                            GC-054          8,497                  11/05/18   01/23/19    PIAZZA INC                          
                                                            GC-055         35,123                  11/05/18   01/23/19    PIAZZA INC                          
                                                            GC-056R         3,307                  12/10/18   01/22/19    PIAZZA, INC.                        
                                                            GC-057          7,208                  12/10/18   01/22/19    PIAZZA, INC.                        
                                                            GC-058          7,435                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-059         -2,640                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-060         16,794                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-061         25,487                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-062          1,163                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-063            583                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-064         22,479                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-065         41,509                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-066         49,604                  01/22/19   02/11/19    PIAZZA, INC.                        
                                                            GC-067          5,784                  02/06/19   02/22/19    PIAZZA,INC.                         
                                                            GC-068          1,564                  02/06/19   02/22/19    PIAZZA,INC.                         
                                                            GC-069R        -2,400                  09/12/19   09/13/19    PIAZZA, INC.                        
                                                            GC-070R        65,000                  09/12/19   10/04/19    PIAZZA, INC.                        
                                                            GC-071R        -8,000                  09/12/19   09/26/19    PIAZZA, INC.                        
                                                            GC-072R        -5,132                  09/12/19   09/13/19    PIAZZA, INC.                        
                                                            MC-001        -51,800                  12/04/17   06/01/18    Pearl River H/P/E dba Bertussi's    
                                                            MC-002       -100,000                  12/04/17   06/01/18    Pearl River H/P/E dba Bertussi's    
                                                            MC-003          9,648                  12/04/17   06/01/18    Pearl River P/H/E dba Bertussi's    
                                                            MC-004        -50,000                  12/04/17   06/01/18    Pearl River H/P/E dba Bertussi's    
                                                            MC-005          5,271                  12/04/17   06/01/18    Pearl River H/P/E dba Bertussi's    
                                                            MC-006         12,000                  12/04/17   06/01/18    Pearl River H/P/E dba Bertussi's    
                                                            MC-007         66,160                  04/01/19   04/01/19    PEARL RIVER HEATING,PLUMBING,ELECTRI
                                                            MC-008          8,823                  11/05/18   11/26/18    PEARL RIVER HEATING PLUMBING & ELEC 
                                                            MC-009            805                  11/05/18   11/30/18    PEARL RIVER HEATING PLUMBING & ELEC 
                                                            MC-010            805                  11/05/18   11/30/18    PEARL RIVER HEATING PLUMBING & ELECT
                                                            MC-011          8,025                  11/05/18   11/26/18    PEARL RIVER HEATING PLUMBING & ELECT
                                                            MC-012R         7,319                  01/22/19   02/25/19    PEARL RIVER HEATING,PLUMBING & ELECT
                                                            MC-013R        -2,251                  01/22/19   02/25/19    PEARL RIVER HEATING,PLUMBING & ELECT
                                                            MC-014          9,994                  05/20/19   05/21/19    PEARL RIVER PH&E                    
                                                            MC-015         -2,646                  06/17/19   06/19/19    PEARL RIVER HEATING & PLUMBING,INC. 
                                                            PC-001        -14,350                  09/18/17   10/12/17    L.J. Coppola, Inc.                  
                                                            PC-002         -6,635                  12/04/17   06/01/18    L.J. Coppola Inc                    
                                                            PC-003           -536                  12/04/17   06/01/18    L.J. Coppola, Inc.                  
                                                            PC-004        -25,000                  12/04/17   06/01/18    L.J. Coppola, Inc.                  
                                                            PC-005          5,197                  04/02/18   05/31/18    L.J. Coppola, Inc.                  
                                                            PC-006            947                  04/02/18   05/31/18    L.J. Coppola, Inc.                  
                                                            PC-007          2,103                  04/02/18   05/31/18    L.J. Coppola, Inc.                  
                                                            PC-008          2,103                  04/02/18   05/31/18    L.J. Coppola, Inc.                  
                                                            PC-009          1,163                  04/02/18   05/31/18    L.J. Coppola, Inc.                  
                                                            PC-010          1,447                  04/02/18   05/31/18    L.J. Coppola, Inc.                  
                                                            PC-011          5,147                  09/17/18   10/15/18    L.J COPPOLA INC                     
                                                            PC-012         46,353                  09/17/18   10/15/18    L.J. COPPOLA INC                    
                                                            PC-013         19,064                  12/10/18   01/24/19    L.J. COPPOLA, INC.                  
                                                            PC-014         11,137                  12/10/18   01/23/19    L.J. COPPOLA, INC.                  
                                                            PC-015          8,120                  12/10/18   01/23/19    L.J. COPPOLA, INC.                  
                                                            PC-016         11,910                  02/06/19   02/27/19    L.J. COPPOLA,INC.                   
 
15-1368   Reconstruction               0-003-026  03/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,806                  12/22/16   12/27/16    W.B. Contracting Corp.              
 
20-1078   Reconstruction               0-003-027  03/22/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            21,000                  04/19/22   05/04/23    GTS Const                           
                                                            002            53,000                  04/19/22     /  /      GTS Const                           
                                                            003           -12,483                  04/19/22   05/04/23    GTS Const                           
 
21-0498   Reconstruction               0-003-028  02/04/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001            6,048                  10/26/22   12/19/23    Milcon Const Corp                   
                                                            001            -1,679                  06/10/22     /  /      Intricate Tech Solutions            
                                                            ABE-0001        1,679                  06/24/22   04/27/23    All Bright Elec                     
 
21-1706   Reconstruction               0-003-029  06/23/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0240   Reconstruction               0-003-030  12/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0077   Reconstruction               0-003-031  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1399SC Visual Structural Inspection 0-003-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXMiddle School (combined w/ 003):
92-1012   Reconstruction               0-004-004  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1158   Reconstruction               0-004-006  04/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1401   Reconstruction               0-004-007  06/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1701   Reconstruction               0-004-008  07/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0030   Reconstruction               0-004-010  08/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0031   Reconstruction               0-004-011  09/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1025   Reconstruction               0-004-013  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0957   Reconstruction               0-004-015  03/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            30,753                  09/06/07   09/12/07    MILCON CONSTRUCTION CORPORATION     
                                                            002             6,491                  12/21/07   01/23/08    Milcon Construction Corporation     
                                                            003             2,551                  06/16/08   09/29/08    Milcon Construction                 
                                                            007             8,364                  06/16/08   09/29/08    Milcon Construction                 
 
07-1674   Reconstruction               0-004-016  05/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01A             2,724                  12/22/09   02/18/10    TALT ELECTRIC                       
                                                            04              4,262                  12/22/09   02/18/10    TALT ELECTRIC                       
 
11-0348   Reconstruction               0-004-017  04/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0952SR Additions and Alterations    0-004-018  04/04/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
 
11-1308   Additions and Alterations    0-004-018  01/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001            18,000                  04/15/13   07/10/13    CALADRI DEVELOPMENT CORP            
                                                            001             2,450                  05/01/13   06/13/14    ANDERSON ELECTRIC INC               
                                                            001             7,800                  07/29/13   08/26/13    S & L Plumbing and Heating Corp.    
                                                            001            13,443                  07/29/13   08/26/13    Rok-Built Construction, Inc         
                                                            001             5,167             775  10/21/13   06/13/14    D.P. Wolff, Inc.                    
                                                            001             3,256                  04/03/14   04/30/14    Anderson Electric, Inc.             
                                                            002             5,054                  05/01/13   06/13/14    ANDERSON ELECTRIC INC               
                                                            002            53,537                  07/29/13   08/26/13    Rok-Built Contruction, Inc          
                                                            002             9,833                  02/04/14   03/31/14    D.P. WOLFF INC                      
                                                            002             2,479                  09/26/13   10/17/13    S & L Plumbing and Heating Corp.    
                                                            002            -9,050                  12/27/13   01/23/14    Caladri Development Corp.           
                                                            002            14,500                  04/03/14   04/30/14    Anderson Electric, Inc.             
                                                            003             1,295                  09/09/13   09/12/13    Rok-Built Construction, Inc.        
                                                            003            15,863                  09/26/13   10/17/13    S & L Plumbing and Heating Corp.    
                                                            003             4,851                  02/04/14   03/31/14    D.P. WOLFF INC                      
                                                            004            13,516                  09/09/13   09/12/13    Rok-Built Construction, Inc.        
                                                            004             1,778                  03/21/14   04/10/14    S & L Plumbing and Heating, Corp.   
                                                            004             1,999                  04/03/14   04/30/14    D.P. Wolff, Inc.                    
                                                            005             2,888                  09/09/13   09/12/13    Rok-Built Construction, Inc.        
                                                            005             3,697                  03/21/14   04/10/14    S & L plumbing and Heating, Corp.   
                                                            005             8,500                  04/03/14   04/30/14    D.P. Wolff, Inc.                    
                                                            006            23,954                  09/09/13   09/12/13    Rok-Built Construction Inc.         
                                                            006             2,650                  03/21/14   04/10/14    S & L Plumbing and Heating Corp.    
                                                            006             2,200                  10/31/14   09/29/16    D.P. Wolff, Inc.                    
                                                            007            80,000                  09/09/13   09/12/13    Rok-Built Construction, Inc.        
                                                            007             5,566                  10/31/14   09/29/16    S&L Plumbing and Heating Corp.      
                                                            007             4,813                  11/20/14   12/01/14    D.P. Wolff, Inc.                    
                                                            008            54,865                  10/21/13   11/25/13    Rok-Built Construction, Inc         
                                                            008            15,112                  03/02/15   03/26/15    D.P. Wolff, Inc.                    
                                                            008             1,451                  05/07/15   05/21/15    S& L Plumbing and Heating Corp.     
                                                            009           103,000                  10/21/13   03/20/14    Rok-Built Construction, Inc.        
                                                            009             6,369                  03/26/15   04/28/15    DP Wolff Inc.                       
                                                            010            12,500                  10/21/13   11/25/13    Rok-Buildt Construction, Inc.       
                                                            010             6,254                  03/26/15   04/28/15    DP Wolff Inc.                       
                                                            011           180,693                  11/29/13   03/20/14    ROK-BUILT CONSTRUCTION,INC          
                                                            011            73,169                  03/26/15   05/22/15    DP Wolff Inc.                       
                                                            012            12,400                  11/29/13   12/24/13    ROK-BUILT CONSTRUCTION,INC          
                                                            013            36,197                  11/29/13   12/24/13    ROK-BUILT CONSTRUCTION,INC          
                                                            014            12,435                  12/27/13   01/23/14    Rok-Built Construction, Inc.        
                                                            015            24,870                  04/03/14   04/30/14    Rok-Built Construction, Inc.        
                                                            016             1,111                  04/03/14   04/30/14    Rok-Built Construction, Inc.        
                                                            017             8,500                  04/03/14   04/30/14    Rok-Built Construction, Inc.        
                                                            018             3,900                  09/12/14   09/24/14    Rok-Built Construction, Inc.        
                                                            EC-003         40,000                  04/04/16   06/07/16    Anderson Electric, Inc.             
                                                            GC-019        -62,575                  03/26/15   04/10/15    Rok Built Construction, Inc.        
 
15-1580   Reconstruction               0-004-019  04/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1400SC Visual Structural Inspection 0-004-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Greenvale Elementary School:
91-0298   Reconstruction               0-006-004  11/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1013   Reconstruction               0-006-005  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0032   Reconstruction               0-006-006  08/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1026   Reconstruction               0-006-007  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0161   Additions and Alterations    0-006-008  05/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1.10            8,731                  06/01/04   06/18/04    Kenstar Const.                      
                                                            1.15G           6,784                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.18           44,925                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.19           -1,582                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.20            5,589                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.22            1,680                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.23            2,945                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.30           38,000                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.32          -85,547                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.34           24,013                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.37           45,978                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.39           15,095                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.4          -153,232                  03/19/04   06/18/04    Kenstar Const.                      
                                                            1.40            6,426                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.41            5,397                  06/01/04   06/07/04    Kenstar Const.                      
                                                            1.7            -3,100                  06/01/04   06/07/04    Kenstar Const.                      
                                                            2-8            -6,823                  02/11/05   04/01/05    Sand L Plumbing Heating             
                                                            2.7            -2,494                  06/01/04   06/18/04    S&L Plumbing                        
                                                            3.1             7,900                  03/19/04   03/19/04    DP Wolff                            
                                                            3.11            3,785           3,785  06/01/04   06/07/04    DP Wolff                            
                                                            3.13            3,559                  08/09/04   08/13/04    DP Wolff                            
                                                            3.2             1,848                  06/01/04   06/07/04    DP Wolff                            
                                                            3.4             1,582                  06/01/04   06/07/04    DP Wolff                            
                                                            3.6G            2,462                  06/01/04   06/07/04    DP Wolff                            
                                                            3.8             8,052                  06/01/04   06/07/04    DP Wolff                            
                                                            3.9             2,319                  06/01/04   06/18/04    DP Wolff                            
                                                            4-5             4,194                  02/11/05   03/14/05    Talt Electric                       
                                                            4.1             1,107                  06/01/04   06/07/04    Talt Elec.                          
                                                            4.2G              671                  06/01/04   06/07/04    Talt Elec.                          
                                                            4.4            -5,871                  08/09/04   08/13/04    Talt Elec.                          
                                                            4.9            12,311                  03/15/07   03/16/07    Talt Electric                       
                                                            5.1             2,651                  03/19/04   03/19/04    Suburban Restoration                
                                                            5.2             7,428                  08/09/04   08/13/04    Suburban Restoration                
                                                            5.4             4,516                  08/09/04   08/13/04    Suburban Restoration                
                                                            6-5            19,299                  02/11/05   03/14/05    ELQ industries                      
                                                            6-7            11,500                  02/11/05   03/14/05    ELQ Industries                      
                                                            6.1G           19,760                  06/01/04   06/07/04    ELQ Industries                      
 
00-1271   Additions and Alterations    0-006-009  07/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1675   Reconstruction               0-006-010  05/07/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0349   Reconstruction               0-006-011  04/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1581   Reconstruction               0-006-012  04/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1194   Reconstruction               0-006-013  06/19/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC01-GES       10,044                  11/03/17   11/24/17    Mengler Mechanical, Inc.            
                                                            GC02-GES       92,768                  03/05/18   03/13/18    Mengler Mechanical, Inc.            
 
18-1404   Reconstruction               0-006-014  03/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADGC1001       23,944                  10/09/20   12/21/20    BARRETT, INC.                       
                                                            ADGC1002        3,589                  10/09/20   12/21/20    BARRETT, INC.                       
                                                            ADGC1003       17,466                  10/09/20   12/21/20    BARRETT, INC.                       
                                                            GC01-001        7,366                  10/09/20   12/21/20    BARRETT, INC.                       
                                                            GC01-002      -45,000                  10/09/20   12/21/20    BARRETT, INC.                       
 
22-0241   Reconstruction               0-006-015  12/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Greenvale Annex:
92-1014   Reconstruction               0-007-001  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1029   Reconstruction               0-007-002  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Greenvale MB:
04-1402SC Visual Structural Inspection 0-011-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Admin. Bldg. - High School Annex:
92-1015   Reconstruction               1-005-001  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0350   Reconstruction               1-005-002  04/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1756   Reconstruction               1-005-003  09/15/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             8,718                  03/14/16   03/18/16    J. Salavtore & Sons, Inc.           
 

          Press Box @ Eastchester HS:
15-0569   New Construction             7-012-001  04/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -20,000                  06/09/16   07/08/16    PALADINO CONCRETE                   
                                                            PCC-002             0                  11/23/16   12/12/16    Paladino Concrete Creations Corp    
 

          District-Wide:
99-1030   Reconstruction               7-999-002  04/25/00  NO CHANGE ORDERS ON ELECTRONIC FILE

TUCKAHOE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-02-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          William E. Cottle Elementary:
90-1304   Reconstruction               0-001-005  05/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0003   Additions and Alterations    0-001-007  07/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1372   Reconstruction               0-001-008  06/12/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0640   Reconstruction               0-001-009  02/25/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1132   Reconstruction               0-001-010  06/14/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1   E-2        11,637                  08/20/03   08/27/03    Solar Elec. Systems                 
                                                            1   RFG         3,000                  08/20/03   08/27/03    Premier-New York                    
                                                            1-W            -5,000                  08/20/03   08/27/03    Arrow Steel Windows                 
                                                            2              20,810                  08/20/03   08/27/03    Gabriel Contracting                 
                                                            2               1,934                  08/20/03   08/27/03    Brien Hamer                         
                                                            2              -1,700                  08/20/03   08/27/03    Solar Elec. Systems                 
                                                            3               5,039                  08/20/03   08/27/03    Gabriel Contracting                 
                                                            3               3,900                  08/20/03   08/27/03    Solar Elec. Systems                 
                                                            3                 750                  08/20/03   08/27/03    Brien Hamer                         
                                                            3             -94,257                  08/20/03   08/27/03    Gabriel Contracting                 
                                                            3   E-1         5,512                  08/20/03   08/27/03    RLJ Elec.                           
                                                            4               9,654                  08/20/03   08/27/03    Brien Hamer                         
                                                            4   E-2         1,950                  08/20/03   08/27/03    Solar Elec. Systems                 
                                                            6               1,393                  08/20/03   08/27/03    Brien Hamer                         
                                                            M1-1            9,700                  08/20/03   08/27/03    Diggins Mech.                       
                                                            M1-2            4,500                  08/20/03   08/27/03    Diggins Mech.                       
                                                            M1-3           -3,000                  08/20/03   08/27/03    Diggins Mech.                       
 
02-0062   Reconstruction               0-001-011  09/11/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1118   Reconstruction               0-001-013  03/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0103   Reconstruction               0-001-014  01/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -8,484                  06/22/09   08/06/09    RLJ ELECTRIC CORPORATION            
                                                            RM-01         -18,290                  12/15/08   04/03/09    RM CONTRACTING SERCIVES, INC.       
 
06-0925   Reconstruction               0-001-015  06/27/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0484   Reconstruction               0-001-016  08/01/07  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2083   Additions and Alterations    0-001-018  11/27/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          4,270                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-002          3,022                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-003          1,998                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-004          2,646                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-005            507                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-006          6,613                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-007          6,042                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-008          7,433                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTINGG OF WE
                                                            EC-009          3,009                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-010          5,123                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            EC-011          1,976                  05/14/21   08/16/21    GLOBAL ELECTRICAL CONTRACTING OF WES
                                                            GC-001         10,098                  05/01/19   05/29/19    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-002         46,067                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-003         18,416                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-004          6,167                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-005          3,366                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-006         29,188                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-007         27,605                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-008            953                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-009         15,745                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-011          4,914                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-012          7,351                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-013          4,885                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-014          5,273                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-015         12,903                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-016          4,821                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-017          3,791                  04/21/21   05/18/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-018          3,949                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-019          5,184                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-020            617                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-021          6,114                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-022          8,567                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            GC-023          1,441                  04/15/21   06/23/21    BERTUSSI'A CONTRACTING SERVICES     
                                                            GC-024          4,703                  04/15/21   06/23/21    BERTUSSI'S CONTRACTING SERVICES     
                                                            MC-001          1,380                  04/16/21   07/27/21    LOE LOMBARDO PLUMBING & HEATING     
                                                            MC-002          4,297                  04/16/21   07/27/21    JOE LOMBARDO PLUMBING & HEATING     
                                                            MC-003          9,021                  04/16/21   07/27/21    JOE LOMBARDO PLUMBING & HEATING     
 
18-0053   Reconstruction               0-001-019  08/07/18  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0840   Reconstruction               0-001-020  03/18/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-001          2,148                  11/22/22   10/19/23    DEROSA SPORTS CONSTRUCTION INC      
                                                            SC-002          4,208                  11/22/22   09/12/23    DEROSA SPORTS CONSTRUCTION INC      
                                                            SC-003          1,065                  11/22/22   09/12/23    DEROSA SPORTS CONSTRUCTION INC      
                                                            SC-004         53,525                  11/22/22   10/19/23    DEROSA SPORTS CONSTRUCTION INC      
                                                            SC-005        -26,803                  03/24/23   12/19/23    DEROSA SPORTS CONSTRUCTION INC      
                                                            SC-006          6,135                  03/24/23   12/19/23    DEROSA SPORTS CONSTRUCTION INC      
                                                            SC-007         10,978                  07/24/23   12/27/23    DEROSA SPORTS CONSTRUCTION          
 
01-0898SC Visual Structural Inspection 0-001-SC1  03/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tuckahoe Middle/High School:
90-1305   Reconstruction               0-002-005  05/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1585   Reconstruction               0-002-006  06/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1384   Reconstruction               0-002-007  06/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1385   Reconstruction               0-002-008  06/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0641   Reconstruction               0-002-009  02/25/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1133   Reconstruction               0-002-010  06/14/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,522                  08/22/01   02/11/02    Brien Hamer                         
                                                            1              14,715                  08/20/03   08/27/03    Gabriel Contracting                 
                                                            1               1,748                  08/20/03   08/27/03    Precision Plumbing                  
                                                            1  E-1         33,200                  08/20/03   08/27/03    RLJ Elec.                           
                                                            1  RFG         13,400                  08/20/03   08/27/03    Premier-New York                    
                                                            1-E-2          11,637                  08/22/01   02/11/02    Solar Elec. Systems                 
                                                            2               8,500                  08/22/01   02/11/02    Gabriel Contracting                 
                                                            2               1,934                  08/22/01   02/11/02    Brien Hamer                         
                                                            2              11,040                  08/20/03   08/27/03    Solar Elec. Systems                 
                                                            2.E-1           9,721                  08/22/01   02/11/02    RLJ Elec.                           
                                                            3               1,419                  08/20/03   08/27/03    Brien Hamer                         
                                                            3               4,600                  08/20/03   08/27/03    Solar Elec. Systems                 
                                                            3-E-1           5,512                  08/22/01   02/11/02    RLJ Elec.                           
                                                            4               9,654                  08/22/01   02/11/02    Brien Hamer                         
                                                            4               2,850                  08/20/03   08/27/03    Solar Elec. Systems                 
                                                            4               6,000                  08/20/03   08/27/03    RLJ Elec.                           
                                                            5               3,250                  08/22/01   02/11/02    Brien Hamer                         
                                                            5              -5,000                  08/20/03   08/27/03    RLJ Elec.                           
                                                            6               3,807                  08/20/03   08/27/03    Brien Hamer                         
                                                            7               1,934                  08/20/03   08/27/03    Brien Hamer                         
                                                            E-1            33,200                  08/22/01   02/11/02    RLJ Elec.                           
                                                            M1-1            9,700                  08/22/01   02/11/02    Diggins Mech.                       
                                                            M1-2            4,500                  08/22/01   02/11/02    Diggins Mech.                       
                                                            M1-3           -3,000                  08/22/01   02/11/02    Diggins Mech.                       
                                                            RFG-1          16,400                  08/22/01   02/11/02    Premier-New York                    
                                                            STG-1           5,340                  08/22/01   02/11/02    Nickerson Corp.                     
 
02-0063   Reconstruction               0-002-011  09/11/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1705   Reconstruction               0-002-012  04/18/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            Roof-01         6,511                  02/02/04   02/10/04    Monpat Construction                 
                                                            Roof-02           500                  02/02/04   02/10/04    Monpat Construction                 
                                                            Roof-03         6,601                  02/02/04   02/10/04    Monpat Construction                 
                                                            Roof-04           862                  02/02/04   02/10/04    Monpat Construction                 
                                                            Roof-05         1,070                  02/02/04   02/10/04    Monpat Construction                 
                                                            Roof-06         3,778                  02/02/04   02/10/04    Monpat Construction                 
 
06-0108   Additions and Alterations    0-002-013  01/08/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            GC-001         -5,221                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-002         37,000                  10/05/07   10/05/07    Piazza brothers, Inc                
                                                            GC-003         53,000                  10/05/07   10/05/07    Piazza Brothers, inc                
                                                            GC-004          1,729                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-005         22,000                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-006         18,000                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-007         15,000                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-008         12,000                  10/05/07   10/05/07    Piazza Brothers, inc                
                                                            GC-009          9,750                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-010            835                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-011         51,291                  10/05/07   10/05/07    Piazza Brothers, Inc                
                                                            GC-012          9,463                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-013          1,065                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-014          3,450                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-015          3,150                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-016          1,355                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-017          2,338                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-018          1,188                  12/15/08     /  /      PIAZZA BROTHERS, INC.               
                                                            GC-019         37,000                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-020         33,000                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-021         36,000                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-022           -648                  12/15/08   02/27/09    PIAZZA BROTHERS, INC.               
                                                            GC-023         60,000                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-024         -4,501                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-025              0                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-026              0                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-027              0                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-028              0                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            GC-029              0                  12/15/08   04/03/09    PIAZZA BROTHERS, INC.               
                                                            MC-001            697                  12/15/08   03/04/09    J&M HEATING & AIR CONDITIONING, INC.
                                                            MC-002            583                  12/15/08   03/04/09    J&M HEATING & AIR CONDITIONING, INC.
                                                            MC-003          1,275                  12/15/08   07/06/09    J&M HEATING & AIR CONDITIONING, INC.
                                                            MC-004          3,566                  12/15/08   07/06/09    J&M HEATING & AIR CONDITIONING, INC.
                                                            MC-005            484                  12/15/08   07/06/09    J&M HEATING & AIR CONDITIONING, INC.
                                                            MC-006         14,000                  12/15/08   02/25/09    J&M HEATING & AIR CONDITIONING, INC.
                                                            PC-001         -4,398                  10/05/07   10/05/07    S & L Plumbing & Heating Corp       
                                                            PC-002          6,179                  12/24/07   02/23/08    S&L PLUMBING AND HEATING CORP.      
                                                            PC-003          1,052                  12/24/07   03/19/08    S&L PLUMBING AND HEATING CORP.      
                                                            PC-004          2,824                  12/15/08   07/08/09    S&L PLUMBING AND HEATING            
                                                            PC-005           -813                  12/15/08   03/05/09    S&L PLUMBING AND HEATING CORP.      
                                                            SC-001         34,545                  10/05/07   10/05/07    DeRosa Tennis Contractors, Inc      
                                                            SC-002         21,376                  10/05/07   10/05/07    DeRosa Tennis Contractors, Inc      
                                                            SC-003          4,940                  10/05/07   10/05/07    DeRosa Tennis Contractors, Inc      
                                                            SC-004        -36,340                  10/05/07   10/05/07    DeRosa Tennis Contractors, Inc      
                                                            SC-005        -30,000                  10/05/07   10/05/07    DeRosa Tennis Contractors, Inc      
                                                            SC-006          2,800                  10/05/07   10/05/07    DeRosa Tennis Contractors, Inc      
                                                            SC-007         21,787                  10/05/07   10/05/07    DeRosa Tennis Contractors, Inc      
                                                            SC-009         29,500                  12/24/07   02/23/08    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-010          2,500                  12/24/07   02/23/08    DEROSA TENNIS CONTRACTORS, INC      
                                                            SC-011           -787             787  12/24/07     /  /      DEROSA TENNIS CONTRACTORS, INC      
                                                            SC-012         -1,000           1,000  12/24/07   02/23/08    DEROSA TENNIS CONTRACTORS, INC      
                                                            SC-013          3,500                  12/24/07   02/23/08    DEROSA TENNIS CONTRACTORS, INC      
                                                            SC-014         -4,000           4,000  12/24/07   02/23/08    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-015         20,700                  12/15/08   04/03/09    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-016          7,000                  12/15/08   04/03/09    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-017          5,000                  12/15/08   04/03/09    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-018              0                  12/15/08   04/03/09    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-019              0                  12/15/08   04/07/09    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-020              0                  12/15/08   03/04/09    DEROSA TENNIS CONTRACTORS, INC.     
                                                            SC-021        -15,950                  12/15/08   04/07/09    DEROSA TENNIS CONTRACTORS, INC.     
 
05-0054   Reconstruction               0-002-014  07/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0926   Reconstruction               0-002-015  06/27/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0017   Reconstruction               0-002-016  07/16/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            14,230                  11/05/07   11/14/07    SUBURBAN RESTORATION CO.            
 
07-0272   Reconstruction               0-002-017  09/28/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1170   Reconstruction               0-002-018  02/06/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1088   Reconstruction               0-002-019  03/26/10  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0098   Reconstruction               0-002-021  10/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,650                  06/16/17   09/14/17    A-1 Construction Services           
                                                            2              -1,860                  11/07/17   12/14/17    A-1 Construction Services           
                                                            3               6,500                  11/07/17   12/14/17    A-1 Construction Services           
 
18-1303   Reconstruction               0-002-022  03/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         21,104                  05/20/21   06/22/21    Pierotti Corporation                
                                                            GC-002         31,059                  05/20/21   06/22/21    Pierotti Corporation                
                                                            GC-003          6,944                  04/23/21   05/18/21    PIEROTTI CORP.                      
                                                            GC-004          4,651                  04/23/21   05/18/21    PIEROTTI CORP.                      
                                                            GC-005          4,886                  04/23/21   05/18/21    PIEROTTI CORP.                      
 
19-0126   Reconstruction               0-002-023  11/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-001          6,538                  09/24/20   11/06/20    SOUTHEAST MECHANICAL CORP.          
 
21-1203   Reconstruction               0-002-024  03/14/22  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0897SC Visual Structural Inspection 0-002-SC1  03/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          PRESS BOX @ TUCKAHOE MIDDLE/HIGH:
06-0134   New Construction             7-005-001  01/08/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          CONCES. BUILDING @ TUCK MIDD/HIGH:
06-0135   New Construction             7-006-001  01/08/07  NO CHANGE ORDERS ON ELECTRONIC FILE

BRONXVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-03-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Bronxville School:
94-0617   Additions and Alterations    0-001-005  02/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1694   Reconstruction               0-001-006  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1205   Reconstruction               0-001-008  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0057   Reconstruction               0-001-009  08/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1804   Reconstruction               0-001-010  07/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1126   Reconstruction               0-001-011  10/24/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001            36,256                  05/12/14   05/21/14    Kenstar Construction Corporation    
                                                            001             5,176                  06/25/14   10/24/14    Lippolis Electric, Inc.             
                                                            002            13,956                  05/12/14   05/21/14    Kenstasr Construction Corporation   
                                                            002             7,984                  06/25/14     /  /      Lippolis Electric, Inc.             
                                                            EC-003        -14,962                  09/19/14   09/29/14    Lippolis Electric, Inc.             
                                                            EC-004          4,628                  09/19/14     /  /      Lippolis Electric, Inc.             
                                                            EC-005         13,630                  09/19/14   09/29/14    Lippolis Electric, Inc.             
                                                            EC-006          2,596                  09/19/14   09/29/14    Lippolis Electric, Inc.             
                                                            EC-007          5,180                  09/19/14   09/29/14    Lippolis Electric, Inc.             
                                                            EC-008          4,127                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-009          1,416                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-010          4,127                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-011          4,717                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-012            944                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-013          5,306                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-014          1,348                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-015          2,477                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-016          1,416                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-017          2,831                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-018          2,123                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-019          2,831                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-020          2,831                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-021          3,302                  02/17/15   02/19/15    Lippolis Electric, Inc.             
                                                            EC-022         14,480                  02/17/15     /  /      Mengler Mechanical, Inc.            
                                                            EC-022          8,523                  04/29/15   05/26/15    Lippolis Electric, Inc.             
                                                            EC-023          2,487                  05/12/15   06/10/15    Lippolis Electric Inc.              
                                                            EC-024          1,062                  09/03/15   10/28/15    Lippolis Electric Inc.              
                                                            EC-025          5,655                  09/03/15   10/28/15    Lippolis Electric Inc.              
                                                            EC-026          8,350                  09/03/15   10/28/15    Lippolis Electric Inc.              
                                                            EC-027          1,421                  09/03/15   10/28/15    Lippolis Electric Inc.              
                                                            EC-028          2,478                  09/03/15   10/28/15    Lippolis Electric Inc.              
                                                            EC-029          4,722                  09/03/15   10/28/15    Lippolis Electric Inc.              
                                                            EC-030          4,640                  09/30/15   11/03/15    Lippolis Electric, Inc.             
                                                            EC-031          6,806                  01/26/16   04/19/16    Lippolis Electric, Inc.             
                                                            EC-032          3,212                  11/24/15   01/05/16    Lippolis Electric, Inc.             
                                                            EC-033         -7,200                  11/24/15   01/05/16    Lippolis Electric, Inc.             
                                                            EC-034          3,635                  01/26/16   04/19/16    Lippolis Electric, Inc.             
                                                            EC-035          8,483                  01/26/16   04/19/16    Lippolis Electric, Inc.             
                                                            EC-036          4,563                  01/26/16   04/19/16    Lippolis Electric, Inc.             
                                                            EC-037          8,123                  01/26/16   04/19/16    Lippolis Electric, Inc.             
                                                            EC-038          1,007                  01/26/16   04/19/16    Lippolis Electric, Inc.             
                                                            EC-039            484                  01/26/16   04/19/16    Lippolis Electric, Inc.             
                                                            EC-40           9,234                  03/17/16   03/23/16    Lippolis Electric, Inc.             
                                                            GC-003         15,000                  07/25/14   10/29/14    Kenstar Construction Corporation    
                                                            GC-004          9,551                  07/25/14   10/29/14    Kenstar Construction Corporation    
                                                            GC-005          3,682                  07/25/14   10/29/14    Kenstar Construction Corporation    
                                                            GC-006          4,206                  07/25/14   10/28/14    Kenstar Construction Corporation    
                                                            GC-008         23,355                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-009          4,794                  09/08/14   09/29/14    Kenstar Construction Corporaiton    
                                                            GC-010          1,105                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-011          5,788                  09/08/14   09/29/14    Kenstar Construction Corporaiton    
                                                            GC-012          6,658                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-013         17,511                  09/08/14   09/29/14    Kenstar Construction Corporaiton    
                                                            GC-014         80,290                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-015         19,747                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-016         13,453                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-017         41,437                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-018         10,738                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-019          1,645                  09/08/14   09/29/14    Kenstar Construction Coproration    
                                                            GC-020         13,842                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-021          1,224                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-022         14,231                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-023         16,756                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-024          2,357                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-025          9,366                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-026          1,848                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-027          3,725                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-028          9,197                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-029          1,789                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-030          4,819                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-031       -135,000                  09/19/14   09/29/14    Kenstar Construction Corporation    
                                                            GC-041        -14,509                  10/11/16     /  /      Kenstar IFIC Construction Completing
                                                            GC-042         22,782                  10/11/16     /  /      Kenstar IFIC Construction Completing
                                                            GC-044GC       88,744                  10/11/16     /  /      Kenstar IFIC Construction Completing
                                                            GC-045         30,888                  10/11/16     /  /      Kenstar IFIC Construction Completing
                                                            GC-07           3,485                  09/08/14   09/29/14    Kenstar Construction Corporation    
                                                            MC-001            586                  07/25/14   10/28/14    Mengler Mechanicals, Inc.           
                                                            MC-002          6,335                  07/25/14   10/28/14    Mengler Mechanical, Inc.            
                                                            MC-003          2,649                  07/25/14   10/28/14    Mengler Mechanical, Inc.            
                                                            MC-004          2,789                  01/20/15   01/27/15    Mengler Mechanical, Inc.            
                                                            MC-005          2,439                  01/20/15   01/27/15    Mengler Mechanical, Inc.            
                                                            MC-006            898                  01/20/15   01/27/15    Mengler Mechanical, Inc.            
                                                            MC-007          2,311                  01/20/15   01/27/15    Mengler Mechanical, Inc.            
                                                            MC-008            834                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-009          1,540                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-010          4,320                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-011            998                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-012            187                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-013            592                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-014            435                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-015            524                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-016          2,986                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-017          3,696                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-018          9,194                  01/20/15   01/28/15    Mengler Mechanical, Inc.            
                                                            MC-019         14,480                  02/17/15   02/19/15    Mengler Mechanical, Inc.            
                                                            MC-020          3,104                  06/22/15   10/29/15    Mengler Mechanical, Inc.            
                                                            MC-021          1,690                  09/03/15   10/28/15    Mengler Mechanical Inc.             
                                                            MC-022         26,844                  09/03/15   10/28/15    Mengler Mechanical Inc.             
                                                            MC-023          5,183                  09/03/15   10/28/15    Mengler Mechanical Inc.             
                                                            MC-024          6,258                  02/22/16   05/04/16    Mengler Mechanical, Inc.            
                                                            MC-025         10,265                  04/22/16   05/04/16    Mengler Mechanical, Inc.            
                                                            MC-026          2,335                  06/20/16   07/11/16    Mengler Mechanical, Inc.            
                                                            PC-001          3,387                  07/25/14   10/28/14    Pearl River Plumbing & Heating      
                                                            PC-002          8,026                  12/19/14   01/21/15    Pearl River Plumbing & Heating      
                                                            PC-003          4,944                  12/19/14   01/21/15    Pearl River Plumbing & Heating      
                                                            PC-004         35,728                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-005         12,608                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-006          6,670                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-008          8,586                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-009          1,779                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-010          2,069                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-011          2,712                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-012          2,057                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
                                                            PC-013          7,924                  06/22/15   10/29/15    Pearl River Plumbing & Heating      
                                                            PC-014          1,069                  04/22/16   05/04/16    Pearl River Plumbing & Heating      
                                                            PC-015             22                  04/22/16   05/04/16    Pearl River Plumbing & Heating      
                                                            PC-016         18,016                  04/22/16   05/04/16    Pearl River Plumbing & Heating      
                                                            PC-017          8,468                  04/22/16     /  /      Pearl River Plumbing & Heating      
                                                            PC-018         16,928                  04/22/16   05/04/16    Pearl River Plumbing & Heating      
                                                            PC-019           -875                  04/22/16   05/04/16    Pearl River Plumbing & Heating      
                                                            PC-07           4,823                  04/29/15   05/26/15    Pearl River Plumbing & Heating      
 
99-1660   Additions and Alterations    0-001-012  06/09/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2R-45          -5,657                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-46          -3,656                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-47           7,465                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-48          24,500                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-49          36,000                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-50          10,611                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-51          10,862                  05/27/04   09/16/04    Liberty Bond Services               
                                                            2R-52          15,874                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-53           5,219                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-54          11,945                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-55           2,254                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-56           4,624                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-57           1,471                  08/27/04   09/16/04    Liberty Bond Services               
                                                            2R-58           1,448                  03/02/05   03/29/05    Liberty Bond Service                
                                                            2R-59           7,986                  03/02/05     /  /      Liberty Bond Service                
                                                            2R-60          13,039                  03/02/05   03/29/05    LIberty Bond Service                
                                                            2R-61          20,960          20,960  03/02/05   03/23/05    Liberty Bond Service                
                                                            2R-62          19,931          19,931  03/02/05   03/23/05    Liberty Bond Service                
                                                            2R-63         134,988                  03/02/05   06/10/05    Liberty Bond Service                
                                                            2R-64          27,196                  03/02/05   03/29/05    Liberty Bond Service                
                                                            2R-65          11,364                  12/30/04   02/24/05    Liberty Bond Services               
                                                            2R-66          22,235                  12/30/04   02/24/05    Liberty Bond Services               
                                                            2R-67          12,851                  12/30/04   02/24/05    Liberty Bond Services               
                                                            2R-68          38,761                  03/02/05   03/29/05    Liberty Bond Service                
                                                            2R-69          11,258                  03/02/05   03/29/05    Liberty Bond Service                
                                                            2R-70          13,264                  03/02/05   03/29/05    Liberty Bond Service                
                                                            2R-71           2,645                  03/02/05   03/29/05    Liberty Bond Service                
                                                            2R-72           5,424                  03/02/05   03/29/05    liberty Bond Service                
                                                            2R-73           2,719                  03/02/05   03/29/05    Liberty Bond Services               
                                                            2R-74          30,351          30,351  03/02/05   03/23/05    Liberty Bond Services               
                                                            2R-75          60,369                  03/02/05     /  /      Liberty Bond Service                
                                                            2R-76          17,731                  03/02/05   03/29/05    Liberty Bond Service                
                                                            2R.10          16,179                  04/10/02   04/26/02    Picco & Sons                        
                                                            2R.12           4,319                  04/10/02   04/26/02    Picco & Sons                        
                                                            2R.13           1,581           1,581  04/10/02   Disapproved Picco & Sons                        
                                                            2R.15          48,656                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.16          71,891                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.17           7,695                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.18          10,751                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.19          33,457                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.2            2,158                  04/10/02   04/25/02    Picco & Sons                        
                                                            2R.20           4,500                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.21           9,732                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.22          32,000                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.23          16,000                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.24          18,722                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.25           9,000                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.26           6,500                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.27          34,828                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.28          31,552                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.29          12,654                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.3           36,973                  04/10/02   04/30/02    Picco & Sons                        
                                                            2R.30          37,385                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.31          26,350                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.32          23,620                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.33          19,136                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.34           9,992                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.35          21,226                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.36          32,439                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.37           3,660                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.38          26,178                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.39          31,207                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.4           30,000                  04/10/02   04/26/02    Picco & Sons                        
                                                            2R.40          12,360                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.41           1,400                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.42          13,843                  04/16/03   05/02/03    Picco & Sons                        
                                                            2R.5            6,700                  04/10/02   07/30/02    Picco & Sons                        
                                                            2R.7           17,792                  04/10/02   04/26/02    Picco & Sons                        
                                                            2R.8            4,823                  04/10/02   04/30/02    Picco & Sons                        
                                                            2R.9            6,467                  04/10/02   04/26/02    Picco & Sons                        
                                                            5-2             7,245                  03/02/05   03/29/05    D Onofrio General Contractors       
                                                            5-3            10,776                  03/02/05   03/29/05    D onofrio General contractors       
                                                            5-6            21,430          21,430  03/02/05   03/23/05    D Onofrio General Contractors       
                                                            5-7            10,489                  03/02/05   03/29/05    D Onofrio general Contractors       
                                                            5-8             2,618                  03/02/05   03/29/05    D Onofrio General Contractors       
                                                            5-9            40,000                  06/02/05   06/23/05    DOnofrio General Contractors Corp   
                                                            6-19           70,670                  03/02/05   06/10/05    Calvert Corp                        
                                                            6-20           15,514                  03/02/05   03/29/05    Calvert Corp                        
                                                            6.1             3,809                  04/10/02   04/26/02    Calvert Corp.                       
                                                            6.10              670                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.11            2,669                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.12            1,899                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.13            1,382                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.14           10,572                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.15            3,739                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.16            7,224                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.17            4,879                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.2             3,620                  04/10/02   04/26/02    Calvert Corp.                       
                                                            6.21            2,514                  05/02/05   07/25/05    Calvert Corporation                 
                                                            6.22            2,096                  05/02/05   07/22/05    Calvert Corporation                 
                                                            6.23            3,907                  05/02/05   07/25/05    Calvert Corporation                 
                                                            6.24           14,187                  05/02/05   07/25/05    Calvert Corporation                 
                                                            6.25            1,491                  05/02/05   07/25/05    Calvert Corporation                 
                                                            6.3            24,484                  04/10/02   01/07/03    Calvert Corp.                       
                                                            6.4            36,742                  04/10/02   04/26/02    Calvert Corp.                       
                                                            6.5            14,679                  04/10/02   04/26/02    Calvert Corp.                       
                                                            6.7            10,160                  04/10/02   04/26/02    Calvert Corp.                       
                                                            6.8            31,427                  04/16/03   05/02/03    Calvert Corp.                       
                                                            6.9               954                  04/16/03   05/02/03    Calvert Corp.                       
                                                            7-13            1,096                  06/02/05   06/23/05    Richards Conditioning               
                                                            7-20            4,075                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-21            3,934                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-22            4,229                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-23              519                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-24           13,472                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-25            3,512                  08/27/04   09/16/04    Richardss Conditioning              
                                                            7-26            1,349                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-27           16,120                  08/27/04   09/16/04    richards Conditioning               
                                                            7-28              328                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-29              919                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-30            1,514           1,514  08/27/04   09/16/04    Richards Conditioning               
                                                            7-31            4,400                  08/27/04   09/16/04    Richards Conditioning               
                                                            7-32           88,330          88,330  12/30/04   03/02/05    Richards Conditioning               
                                                            7-33            1,299           1,299  12/30/04   03/02/05    Richards Conditioning               
                                                            7-34            1,656                  12/30/04   01/12/05    Richards Conditioning               
                                                            7-35            4,438                  12/30/04     /  /      Richards Conditioning               
                                                            7-36            2,725                  12/30/04   01/12/05    Richards Conditioning               
                                                            7-37            1,037           1,037  12/30/04   03/02/05    Richards Conditioning               
                                                            7-38            2,754           2,754  12/30/04   03/02/05    Richards Conditioning               
                                                            7-39            4,481                  12/30/04   01/12/05    Richards Conditioning               
                                                            7-40           64,575          64,575  12/30/04   03/02/05    Richards Conditioning               
                                                            7-41            1,750                  03/02/05   03/29/05    Richards Conditioning               
                                                            7-42              721                  03/02/05     /  /      Richards Conditioning               
                                                            7-43          -17,757                  03/02/05   03/29/05    Richards Conditioning               
                                                            7-44           18,805                  03/02/05   06/10/05    Richards Conditioning               
                                                            7-45           19,885                  06/02/05   06/23/05    Richards Conditioning               
                                                            7-46           -1,922                  06/02/05   06/23/05    Richards Conditioning               
                                                            7.1             4,692                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.10            2,063                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.11              421                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.12              588                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.14            3,739                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.15            5,619                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.16            1,681                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.17           17,757                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.18            2,137                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.19              278                  04/16/03   05/02/03    Richards Conditioning               
                                                            7.2               572                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.3             3,957                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.4               175                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.5             2,498                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.6           107,677                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.7             7,886                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.8             1,335                  04/10/02   04/26/02    Richards Conditioning               
                                                            7.9           100,000                  04/16/03   05/02/03    Richards Conditioning               
                                                            8-12            9,203                  06/03/05   06/23/05    Naber Electric Corp                 
                                                            8.1            19,500                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.10            8,905                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.2             7,000                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.4             3,480                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.5             9,965                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.6             1,978                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.7               744                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.8               344                  04/10/02   04/26/02    Naber Elec.                         
                                                            8.9               275                  04/10/02   04/26/02    Naber Elec.                         
                                                            8R-15          10,714                  06/02/05   06/23/05    Solar Electric Systems              
                                                            8R-16          11,568                  06/02/05     /  /      solar Electric Systems              
                                                            8R-17          15,547                  08/27/04   09/16/04    Solar Electric Systems              
                                                            8R-18          18,417                  08/27/04   09/16/04    Solar Electric Systems              
                                                            8R-19           2,756                  08/27/04   09/16/04    Solar Electric Systems              
                                                            8R-20         119,000         119,000  12/30/04   03/02/05    Solar Electric Systems              
                                                            8R-21          43,900                  12/30/04     /  /      Solar electric Systems              
                                                            8R-22           2,300                  12/30/04   02/24/05    solar Electric Systems              
                                                            8R-23           2,650                  12/30/04   02/24/05    solar Electric Systems              
                                                            8R-24           8,500                  12/30/04   02/24/05    solar Electric Systems              
                                                            8R-25           4,700                  12/30/04     /  /      Solar Electric Systems              
                                                            8R-26           1,900                  12/30/04     /  /      Solar Electric Systems              
                                                            8R-27           8,450                  12/30/04   02/24/05    Solar Electric Systems              
                                                            8R-28           3,138                  12/30/04   06/10/05    Solar electric Systems              
                                                            8R-29           2,312                  03/02/05   03/29/05    Solar electric Systems              
                                                            8R-30           8,915                  03/02/05   03/29/05    Solar electric Systems              
                                                            8R-31           7,221                  03/02/05   03/29/05    Solar Electric Systems              
                                                            8R-32           5,239                  03/02/05   03/29/05    solar Electric Systems              
                                                            8R.1           69,000                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.10           1,062                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.11           1,728                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.12           3,382                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.13           3,602                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.14           3,025                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.2          298,561                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.3           38,396                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.4            5,963                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.5            1,598                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.7           11,518                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.8           90,336                  04/16/03   05/02/03    Solar Electric Systems              
                                                            8R.9            5,742                  04/16/03   05/02/03    Solar Electric Systems              
                                                            9-10            4,543                  03/02/05   03/29/05    Regional Mangement Consulting       
                                                            9-2             4,266                  03/02/05   03/29/05    Regional Mangement                  
                                                            9-7            23,805                  03/02/05   03/29/05    Regional Mangement Consulting       
                                                            9.1            17,992                  04/10/02   04/26/02    Regional Mgmt.                      
                                                            9.3            25,187                  04/10/02   04/26/02    Regional Mgmt.                      
                                                            9.4           -23,806                  04/10/02   04/26/02    Regional Mgmt.                      
                                                            9.5             8,210                  04/10/02   04/26/02    Regional Mgmt.                      
                                                            9.6            14,652                  04/16/03   05/02/03    Regional Mgmt.                      
                                                            9.8             2,594                  04/16/03   05/02/03    Regional Mgmt.                      
                                                            9.9            17,307                  03/02/05   04/27/05    Regional Management Consulting      
 
04-1412   Reconstruction               0-001-013  08/31/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,000                  11/21/06   01/12/07    AY Electric                         
                                                            002             5,806                  11/21/06   01/12/07    Ay Electric                         
 
05-0999   Reconstruction               0-001-014  05/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               750                  09/19/07   11/08/07    ABBOTT & PRICE, INC.                
                                                            002             1,130                  10/29/07   11/09/07    Abbott & Price Inc                  
                                                            003             2,153                  10/29/07   11/09/07    Abbott & Price                      
 
05-1080   Reconstruction               0-001-015  04/13/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            18,055                  11/21/06   01/09/07    Etre Associates                     
                                                            001             4,000                  12/06/06   01/30/07    A Turf                              
                                                            002            75,523                  11/21/06   01/09/07    Etre Associates                     
 
06-0963   Reconstruction               0-001-016  05/10/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,576                  09/19/07   10/17/07    BBR CONTRACTING CORP.               
                                                            002            29,346                  10/29/07   11/08/07    BBR Contracting                     
                                                            003            12,550                  02/28/08   03/08/08    bbr construction                    
 
07-0037   Reconstruction               0-001-017  07/10/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001            25,000                  12/24/07     /  /      FOUR STRONG BUILDERS, INC           
                                                            002             9,600                  01/25/08   04/03/08    FOUR STRONG BUILDERS                
 
07-0201   Reconstruction               0-001-018  08/30/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,857                  02/28/08   04/14/08    mengler mechanical                  
                                                            001             2,713                  03/28/08   08/07/08    SOUTHEAST PLUMBING CORP.            
                                                            002             4,435                  03/28/08   08/07/08    SOUTHEAST PLUMBING CORP.            
                                                            002            11,000                  01/25/08   04/03/08    ROK BUILT CONSTRUCTION              
                                                            003            14,287                  01/25/08   04/03/08    ROK BUILT CONSTRUCTION              
                                                            004             6,700                  01/25/08   04/03/08    ROK BUILT CONSTRUCTION              
                                                            005            28,085                  02/28/08   03/08/08    ROK BUILT CONSTRUCTION              
                                                            006             5,100                  02/28/08   03/08/08    ROK BUILT CONSTRUCTION              
                                                            007          -196,800                  03/28/08   04/21/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            008           -13,050                  03/28/08   04/21/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            01                980                  01/25/08   04/03/08    ROK BUILT CONSTRUCTION              
                                                            010             2,910                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            012             4,738                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            014             6,109                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            016             4,000                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTIION, INC.       
                                                            018           -10,000                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            019             8,555                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            02              7,711                  06/27/08   03/09/09    MENGLER MECHANICAL, INC.            
                                                            020             5,085                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            021            11,546                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            022             2,413                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            023             9,176                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            024            17,741                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            025            23,957                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION,INC.         
                                                            026             1,833                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION,INC.         
                                                            027           -10,944                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            029             7,838                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            03              1,716                  05/15/08   02/20/09    SOUTHEAST PLUMBING CORP.            
                                                            03              4,064                  06/27/08   03/09/09    MENGLER MECHANICAL, INC.            
                                                            031            43,422                  01/23/09   04/03/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            04                511                  05/27/08   02/20/09    SOUTHEAST PLUMBING CORP.            
                                                            04                685                  06/27/08   03/09/09    MENGLER MECHANICAL, INC.            
                                                            05             13,567                  06/27/08   06/25/10    MENGLER MECHANICAL, INC.            
                                                            05             11,477                  09/04/08   04/30/09    SOUTHEAST PLUMBING CORP.            
                                                            06              5,138                  01/23/09   09/19/11    MENGLER MECHANICAL, INC.            
                                                            09             11,084                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            11              1,144                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            13              8,201                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            15              3,801                  05/15/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            17              4,051                  05/27/08   08/28/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            28             12,920                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            30              2,464                  06/27/08   10/27/08    ROK-BUILT CONSTRUCTION, INC.        
                                                            RLJ 01            845                  06/27/08     /  /      RLJ ELECTRIC CORPORATION            
                                                            RLJ 02          1,871                  06/27/08   06/18/09    RLJ ELECTRIC CORPORATION            
                                                            RLJ 03          1,271                  06/27/08   06/18/09    RLJ ELECTRIC CORPORATION            
                                                            RLJ 04          5,164                  06/27/08   06/18/09    RLJ ELECTRIC CORPORATION            
                                                            RLJ 05          7,844                  06/27/08   06/18/09    RLJ ELECTRIC CORPORATION            
                                                            RLJ 06          7,732                  06/27/08   06/18/09    RLJ ELECTRIC CORPORATION            
                                                            RLJ 07          1,770                  06/27/08   06/18/09    RLJ ELECTRIC CORPORATION            
                                                            RLJ 08        -10,472                  04/22/10   01/07/11    RLJ ELECTRIC CORPORATION            
 
07-1229   Reconstruction               0-001-019  02/29/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           329,700                  07/07/08   01/27/09    Mengler Mechanical,Inc              
                                                            001            -2,969                  01/23/09   04/23/09    MENGLER MECHANCIAL, INC.            
                                                            002            -1,927                  01/26/10   04/21/10    MENGLER MECHANICAL INC              
                                                            01            148,000                  07/07/08     /  /      All Bright Electric,Inc             
                                                            01            337,000                  07/07/08   08/18/08    Rok-Built construction,Inc          
                                                            010               785                  01/09/09   05/22/09    ROK BUILT CONSTRUCTION, INC         
                                                            012           105,080                  01/09/09   05/22/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            013            41,385                  01/09/09   05/22/09    ROK-BUILT CONSTRUCTION, INC         
                                                            014           105,451                  01/09/09   05/22/09    ROK-BUILT CONSTRUCTION, INC         
                                                            015             9,183                  02/24/09   04/23/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            02              7,055                  09/30/08   10/30/08    ALL BRIGHT ELECTRIC, INC.           
                                                            02              3,139                  11/26/08   02/18/09    ROK-BUILT CONSTRUCTION,INC.         
                                                            02             44,820                  01/23/09   10/25/11    MENGLER MECHANCIAL, INC.            
                                                            023            -1,830                  12/22/09   02/04/10    ROK BUILTY CONSTRUCTION             
                                                            03              3,783                  09/30/08   10/24/08    ALL BRIGHT ELECTRIC, INC.           
                                                            03              5,567                  11/26/08   02/18/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            03              4,395                  04/29/09   07/17/09    MENGLER MECHANICAL                  
                                                            04              7,997                  09/30/08   10/30/08    ALL BRIGHT ELECTRIC, INC.           
                                                            04              3,257                  11/26/08   02/18/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            04             27,475                  07/16/09   08/18/09    MENGLER MECHANICAL                  
                                                            05              8,662                  11/26/08   05/15/09    ALL BRIGHT ELECTRIC, INC.           
                                                            05              4,036                  11/26/08   02/18/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            05             35,127                  07/16/09   08/18/09    MENGLER MECHANICAL                  
                                                            06             14,601                  11/26/08   02/18/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            06              8,176                  01/09/09   04/23/09    ALL BRIGHT ELECTRIC, INC.           
                                                            06             37,227                  07/16/09   04/15/11    MENGLER MECHANICAL                  
                                                            07             20,483                  01/09/09   05/22/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            07-AB          -4,000                  04/27/09   07/22/09    ALL BRIGHT ELECTRIC                 
                                                            08             28,674                  01/09/09   05/22/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            08-AB           1,288                  04/27/09   07/22/09    ALL BRIGHT ELECTRIC INC             
                                                            09              5,539                  01/09/09   05/21/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            09             42,897                  04/27/09   07/22/09    ALL BRIGHT ELECTRIC INC             
                                                            11              2,773                  01/09/09   05/22/09    ROK-BUILT CONSTRUCTION, INC         
                                                            16             11,877                  02/24/09   04/23/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            17             68,980                  03/25/09   04/23/09    ROK-BUILT CONSTRUCTION              
                                                            18             92,226                  03/25/09   04/23/09    ROK-BUILT CONSTRUCTION, INC.        
                                                            19             27,514                  03/25/09   04/23/09    ROK-BUILT CONSTRUCTION, INC         
                                                            20             21,815                  04/27/09   07/22/09    ROK-BUILT CONSTRUCTION              
                                                            21             33,647                  04/27/09   07/22/09    ROK-BUILT CONSTRUCTION              
                                                            22             31,415                  04/27/09   07/22/09    ROK-BUILT CONSTRUCTION              
 
08-1157   Additions and Alterations    0-001-020  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,930                  11/25/09   01/15/10    MENGLER MECHANICAL                  
                                                            001            12,875                  07/19/10   09/03/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            001             3,153                  09/02/10   09/24/10    J&M HEATING & AC INC                
                                                            001            75,000                  12/21/10   02/18/11    TALT INC                            
                                                            002            11,407                  02/16/10   04/16/10    MENGLER MECHANICAL INC.             
                                                            002             6,000                  07/19/10   09/03/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            002             2,665                  09/02/10   09/24/10    J&M HEATING & AC INC                
                                                            002             5,764                  04/18/11   05/13/11    TALT INC                            
                                                            003             3,376                  09/02/10   09/24/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            003             2,951                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            003           -11,550                  10/25/10   11/05/10    J&M HEATING & AC INC                
                                                            004            16,000                  09/02/10   09/24/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            004             3,562                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            005            21,600                  09/02/10   09/24/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            005             2,400                  05/12/11   07/21/11    MENGLER MECHANICAL INC              
                                                            006            10,770                  11/22/10   11/30/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            007             4,275                  11/22/10   11/30/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            008             2,368                  11/22/10   11/30/10    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            010            12,500                  12/21/10   02/18/11    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            011           -16,068                  05/23/11   07/21/11    FIRST NATL INSURANCE CO/KENSTAR CONS
                                                            012             6,000                  09/23/11   11/01/11    FIRST NATL INSURANCE CO/KENSTAR CONS
 
08-1227   Reconstruction               0-001-021  05/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            20,750                  09/08/09   09/22/09    CALADRI DEVELOPMENT CORP            
                                                            002            -4,000                  04/22/10   07/23/10    CALADRI DEVELOPMENT CORP            
 
10-0901   Reconstruction               0-001-022  04/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               785                  09/08/11   10/05/11    MACE CONTRACTING CORP               
 
12-1253   Reconstruction               0-001-024  06/07/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0497   Reconstruction               0-001-025  11/03/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,964                  07/26/17   07/28/17    Avanti Building Construction Corp.  
                                                            2              23,172                  07/26/17   07/28/17    Avanti Building Construction Corp.  
                                                            3               7,343                  07/26/17   07/28/17    Avanti Building Construction Corp.  
                                                            CO #4          29,926                  07/26/17   07/28/17    Avanti Building Construction Corp.  
                                                            CO #5          23,974                  07/26/17   07/28/17    Avanti Building Construction Corp.  
                                                            CO #6          29,571                  07/26/17   07/28/17    Avanti Building Construction Corp.  
                                                            CO #7          20,639                  07/26/17   07/28/17    Avanti Building Construction Corp.  
                                                            CO 008          7,839                  09/07/17   09/14/17    Avanti Building Construction Corp.  
                                                            CO 009         12,988                  09/07/17   09/14/17    Avanti Building Construction Corp.  
                                                            CO 010        -50,809                  10/23/17   11/08/17    Avanti Building Construction Corp.  
 
18-1012   Additions and Alterations    0-001-027  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            003                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            004             1,632                  09/20/21   12/01/22    Niram, Inc                          
                                                            004             1,632                  09/20/21   12/01/22    Niram, Inc                          
                                                            004                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            005             8,082                  09/20/21   12/01/22    Niram, Inc                          
                                                            005             8,082                  09/20/21   12/01/22    Niram, Inc                          
                                                            005                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            006                 0                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            007                 0                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            008                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            009                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            010           154,780                  03/25/21   05/06/21    NIRAM, INC.                         
                                                            010                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            011                 0                  10/13/22   05/16/23    Foremost Elec Corp                  
                                                            012                 0                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            013                 0                  10/13/22   05/18/23    Foremost Electric Corporation       
                                                            014            41,693                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            015             8,392                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            016             1,334                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            017             4,561                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            018             7,729                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            019               791                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            020             6,867                  10/13/22   05/17/23    Foremost Elec Corp                  
                                                            021            26,560                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            022             2,486                  10/13/22   05/17/23    Foremost Elec Corp                  
                                                            023             3,146                  10/13/22   05/17/23    Foremost Elec Corp                  
                                                            024             1,001                  10/13/22   05/17/23    Foremost Elec Corp                  
                                                            025             1,689                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            026            20,487                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            027             1,947                  10/13/22   05/18/23    Foremost Elec Corp                  
                                                            028            16,471                  05/08/23   12/29/23    FOREMOST ELECTRIC CORP              
                                                            1               4,748                  01/15/20   02/05/20    NIRAM, INC.                         
                                                            1               6,825                  02/18/20   06/02/20    BERTUSSI CONTRACTING, INC.          
                                                            1                   0                  03/25/21   05/25/21    MENGLER MECHANICAL, INC.            
                                                            1                   0                  03/25/21   05/25/21    FOREMOST ELECTRIC CORP.             
                                                            1             -55,000                  03/25/21   05/06/21    NIRAM, INC.                         
                                                            1                   0                  05/17/21   06/10/21    PREFERRED CONSTRUCTION, INC.        
                                                            11              8,343                  03/25/21   05/07/21    NIRAM, INC.                         
                                                            12             12,906                  03/25/21   05/07/21    NIRAM, INC.                         
                                                            13              5,235                  03/25/21   05/07/21    NIRAM, INC.                         
                                                            14           -115,000                  03/25/21   05/07/21    NIRAM, IINC.                        
                                                            15              2,400                  03/25/21   05/07/21    NIRAM, INC.                         
                                                            16             27,835                  03/25/21   05/07/21    NIRAM, INC.                         
                                                            17             17,050                  03/25/21   05/07/21    NIRAM, INC.                         
                                                            18             20,000                  03/25/21   05/06/21    NIRAM, INC.                         
                                                            19             19,608                  03/25/21   05/06/21    NIRAM, INC.                         
                                                            2              18,500                  01/15/20   02/05/20    NIRAM, INC.                         
                                                            2                   0                  03/25/21   05/25/21    MENGLER MECHANICAL, INC.            
                                                            2               6,741                  03/25/21   05/06/21    NIRAM, INC.                         
                                                            2                   0                  05/17/21   06/10/21    PREFERRED CONSTRUCTION, INC.        
                                                            20             13,091                  07/06/22     /  /      Niram Inc                           
                                                            21             14,388                  07/06/22     /  /      Niram Inc                           
                                                            22              2,600                  07/06/22     /  /      Niram Inc                           
                                                            23              3,567                  07/06/22     /  /      Niram Inc                           
                                                            24             21,484                  07/06/22     /  /      Niram Inc                           
                                                            25           -106,757                  07/06/22     /  /      Niram Inc                           
                                                            3              11,294                  01/15/20   02/05/20    NIRAM, INC.                         
                                                            3                   0                  03/25/21   05/25/21    BERTUSSI CONTRACTING, INC.          
                                                            3               6,237                  03/25/21   05/18/21    NIRAM, INC.                         
                                                            3                   0                  05/17/21   06/10/21    PREFERRED CONSTRUCTION, INC.        
                                                            4                   0                  03/25/21   05/25/21    BERTUSSI CONTRACTING, INC.          
                                                            4                   0                  05/17/21   06/10/21    PREFFERED CONSTRUCTION, INC.        
                                                            5                   0                  03/25/21   05/25/21    BERTUSSI CONTRACTING, INC.          
                                                            5             -37,080                  05/17/21   06/10/21    PREFFERED CONSTRUCTION, INC.        
                                                            6                   0                  03/25/21   05/25/21    BERTUSSI CONTRACTING, INC.          
 
17-1973   Reconstruction               0-001-028  08/27/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             1,865                  05/13/19   05/17/19    AVANTI BUILDING CONSTRUCTION CORP.  
                                                            004            20,275                  05/13/19   05/17/19    AVANTI BUILDING COMSTRUCTION CORP.  
                                                            005           -41,581                  05/13/19   05/17/19    avanti building construction corp.  
                                                            1               4,434                  03/08/19   03/13/19    MARFI CONTRACTING CORP.             
                                                            2               9,600                  03/08/19   03/13/19    MARFI CONTRACTING CORP.             
 
18-1878   Reconstruction               0-001-029  05/02/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  09/11/19   09/24/19    VINCO BUILDERS, LLC                 
                                                            2                   0                  09/11/19   09/24/19    VINCO BUILDERS, LLC                 
                                                            3                   0                  10/24/19   10/31/19    VINCO BUILDERS, LLC                 
                                                            4                   0                  02/14/20   06/09/20    VINCO BUILDERS, LLC                 
 
21-0597   Reconstruction               0-001-030  11/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1927   Reconstruction               0-001-031  07/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field Maintenance Building:
11-1341   Additions and Alterations    2-007-002  08/12/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand / Toilets:
10-0919   New Construction             7-006-001  09/25/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
11-1090   New Construction             7-008-001  03/08/13  NO CHANGE ORDERS ON ELECTRONIC FILE

TARRYTOWN UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-01-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          TappanHillPrimary(LsdToBOCES):
91-0888   Reconstruction               0-001-002  04/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0295   Reconstruction               0-001-003  10/26/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1600   Reconstruction               0-001-006  08/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1061   Reconstruction               0-001-007  03/26/97  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0619   Reconstruction               0-001-009  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -10,600                  05/22/06   07/24/06    Hi tech Contracting                 
 
16-1598   Reconstruction               0-001-010  05/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0780EP Energy Project               0-001-E01  02/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Washington Irving Jr. High:
92-0395   Reconstruction               0-002-002  11/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1529   Reconstruction               0-002-005  08/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0587   Additions and Alterations    0-002-006  01/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0997   Additions and Alterations    0-002-007  01/18/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001           4,023                  11/18/10   11/30/10    ARROW STEEL WINDOW CORP             
                                                            W1-EC-01       18,475                  12/08/08   05/19/09    ALL STAR ELECTRIC CORP.             
                                                            W1-EC-02       12,636                  12/08/08   05/19/09    ALLSTAR ELECTRIC CORP.              
                                                            W1-EC-03       -8,565                  05/03/10   08/23/10    ALLSTAR ELECTRIC CORP               
                                                            W1-HC-01       24,257                  12/08/08   02/02/11    CS SYSTEM ASSOCIATES, INC.          
                                                            W1-HC-02       11,184                  12/08/08   02/02/11    ACS SYSTEM ASSOCIATES, INC.         
                                                            W1-PC-01       16,805                  12/08/08   05/19/09    GRUPPUSO PLUMBING CORP.             
                                                            W1-PC-02       12,814                  12/08/08   05/19/09    GRUPPUSO PLUMBING CORP.             
                                                            W1-PC-03       -9,535                  06/08/10   12/10/10    GRUPPUSO PLUMBING CORP              
                                                            WI-GC-01        4,851                  09/26/08   10/30/08    SUBOLO CONTRACTING CORP,            
                                                            WI-GC-02       13,860                  09/26/08   04/30/09    SUBOLO CONTRACTING CORP.            
                                                            WI-GC-03          225                  09/26/08   10/30/08    SUBOLO CONTRACTING CORP.            
                                                            WI-GC-04       60,000                  09/26/08   10/30/08    SUBOLO CONTRACTING CORP.            
                                                            WI-GC-05        6,945                  09/26/08   10/30/08    SUBOLO CONTRACTING CORP.            
                                                            WI-GC-06      -41,430                  04/05/10   06/16/10    SUBOLO CONTRACTING CORP             
 
03-0271   Reconstruction               0-002-008  11/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0620   Reconstruction               0-002-009  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            15-01         -10,000                  05/22/06   07/24/06    Solar Electric Systems              
 
10-1142   Reconstruction               0-002-011  12/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1520   Reconstruction               0-002-012  12/23/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1-1           -2,900                  01/05/17   01/27/17    The LandTek Group, Inc.             
                                                            G2-2           35,391                  01/19/17     /  /      Milcon Construction Corp.           
 
16-0437   Reconstruction               0-002-013  07/20/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2041   Reconstruction               0-002-014  11/20/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0842   Reconstruction               0-002-015  03/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0916   Reconstruction               0-002-016  05/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0781EP Energy Project               0-002-E01  02/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Paulding School:
92-1307   Reconstruction               0-004-002  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1509   Reconstruction               0-004-005  08/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1062   Reconstruction               0-004-006  03/26/97  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0621   Reconstruction               0-004-008  03/17/05  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1143   Reconstruction               0-004-010  12/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1410   Reconstruction               0-004-011  05/13/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1-2-1        -18,050                  03/21/16   03/29/16    Laumar Roofing Co. Inc.             
 
16-0281   Reconstruction               0-004-012  08/18/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0439   Reconstruction               0-004-013  07/20/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0843   Reconstruction               0-004-014  03/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0917   Reconstruction               0-004-015  05/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0852   Reconstruction               0-004-016  02/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0782EP Energy Project               0-004-E01  02/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sleepy Hollow High School:
91-0889   Reconstruction               0-005-001  04/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1184   Reconstruction               0-005-002  05/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1442   Reconstruction               0-005-003  08/13/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1185   Reconstruction               0-005-005  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1530   Reconstruction               0-005-006  08/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1427   Reconstruction               0-005-007  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0336   Reconstruction               0-005-008  11/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0893   Reconstruction               0-005-009  07/17/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0001   Reconstruction               0-005-010  07/24/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0522   Additions and Alterations    0-005-011  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          18,745                  12/19/08   01/22/09    NICKERSON CORP.                     
                                                            1              12,730                  04/07/08   08/06/08    ARCHITECTURAL WINDOW                
                                                            EC-001         13,415                  04/07/08   08/07/08    TALT ELECTRIC                       
                                                            EC-002         14,493                  04/07/08   08/12/09    TALT ELECTRIC                       
                                                            EC-003         12,303                  04/07/08   08/12/09    TALT ELECTRIC                       
                                                            EC-004          5,725                  04/07/08   08/07/08    TALT ELECTRIC                       
                                                            EC-005         16,616                  04/07/08   08/07/08    TALT ELECTRIC                       
                                                            EC-006        -65,000                  04/07/08   08/07/08    TALT ELECTRIC                       
                                                            SC-01          17,064                  11/21/06     /  /      EASTern Excavation                  
                                                            SC-02          16,919                  11/21/06     /  /      Eastern Excavation                  
                                                            SC-15          15,888                  03/23/09   06/24/09    EASTERN EXCAVATION,  INC.           
                                                            SC-16         -20,000                  03/23/09   06/24/09    EASTERN EXCAVATION, INC.            
                                                            SH SC-12       10,827                  08/25/08     /  /      Eastern Excavation, Inc.            
                                                            SH-CS-02       11,506                  02/27/09   04/23/09    NICKERSON CORP.                     
                                                            SH-CS-03       14,717                  05/12/09   07/30/09    NICKERSON CORP.                     
                                                            SH-EC-07       12,946                  04/07/08   08/07/08    TALT ELECTRIC                       
                                                            SH-EC-08       12,818                  04/07/08   08/07/08    TALT ELECTRIC                       
                                                            SH-EC-09       20,044                  04/07/08   08/07/08    TALT ELECTRIC                       
                                                            SH-EC-10       18,167                  04/24/08   08/06/08    TALT ELECTRIC                       
                                                            SH-EC-11       16,591                  04/28/08   08/06/08    TALT ELECTRIC                       
                                                            SH-EC-12       18,399                  11/19/08   07/21/09    TALT ELECTRIC                       
                                                            SH-EC-13       21,743                  11/19/08   07/30/09    TALT ELECTRIC                       
                                                            SH-EC-15       18,141                  11/19/08   07/21/09    TALT ELECTRIC                       
                                                            SH-EC-16        6,272                  05/04/09   09/23/09    TALT ELECTRIC                       
                                                            SH-EC-17       13,000                  05/04/09   09/23/09    TALT ELECTRIC                       
                                                            SH-EC-17        6,272                  05/04/09     /  /      TALT ELECTRIC                       
                                                            SH-EC-18       16,745                  05/04/09   09/23/09    TALT ELECTRIC                       
                                                            SH-EC-19       11,548                  05/04/09     /  /      TALT ELECTRIC                       
                                                            SH-EC-20      185,000                  05/04/09     /  /      TALT ELECTRIC                       
                                                            SH-EC-21       26,171                  06/03/09     /  /      TALT ELECTRIC                       
                                                            SH-EC-22       11,408                  06/03/09   10/07/09    TALT ELECTRIC                       
                                                            SH-EC-23        6,481                  06/03/09   10/07/09    TALT ELECTRIC                       
                                                            SH-EC-24        9,883                  06/03/09     /  /      TALT ELECTRIC                       
                                                            SH-EC-25       12,100                  06/03/09   10/07/09    TALT ELECTRIC                       
                                                            SH-EC-26        7,175                  01/25/10     /  /      TALT ELECTRIC                       
                                                            SH-EC-27      -25,000                  01/25/10   03/18/10    TALT ELECTRIC                       
                                                            SH-G3-02            0                  12/08/08   09/11/09    ARCHITECTURAL WINDOW                
                                                            SH-G3-03        4,956                  08/21/09     /  /      ARCHITECTURAL WINDOWS               
                                                            SH-G4-01       16,872                  04/07/08   08/04/08    TUXEDO FLOORING                     
                                                            SH-G4-02       29,950                  11/19/08   01/22/09    TUXEDO FLOORING                     
                                                            SH-G4-03       20,412                  12/08/08   01/22/09    TUEXEDO FLOORING                    
                                                            SH-G4-04       18,881                  12/08/08   01/22/09    TUXEDO FLOORING                     
                                                            SH-G4-05       10,778                  04/14/09   08/13/09    TUXEDO FLOORING                     
                                                            SH-G4-06       11,470                  06/30/09   08/04/09    TUXEDO FLOORING                     
                                                            SH-GC-01       30,348                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-02      148,398                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-03       15,625                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-04       12,894                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-05       19,156                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-06       56,000                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-07       20,339                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-08       19,862                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-09       16,363                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-10       15,913                  04/07/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-11       18,323                  04/07/08   08/05/08    MPCC CORP.                          
                                                            SH-GC-12       10,179                  04/07/08   08/05/08    MPCC CORP.                          
                                                            SH-GC-13       12,202                  04/07/08   08/05/08    MPCC CORP.                          
                                                            SH-GC-14        7,753                  04/07/08   08/05/08    MPCC CORP.                          
                                                            SH-GC-15       14,337                  04/07/08   08/05/08    MPCC CORP.                          
                                                            SH-GC-16        7,910                  04/07/08   08/05/08    MPCC CORP.                          
                                                            SH-GC-17       11,874                  05/01/08   08/06/08    MPCC CORP.                          
                                                            SH-GC-18       26,463                  05/01/08   08/08/08    MPCC CORP.                          
                                                            SH-GC-19       11,289                  05/01/08   08/06/08    MCCP CORP.                          
                                                            SH-GC-20       17,249                  08/20/08   10/27/08    MPCC CORP.                          
                                                            SH-GC-21       16,898                  08/20/08   06/25/10    MPCC CORP.                          
                                                            SH-GC-22       12,496                  08/20/08   03/09/09    MPCC CORP.                          
                                                            SH-GC-23       15,480                  08/20/08   03/09/09    MPCC CORP.                          
                                                            SH-GC-24       23,276                  11/19/08   01/27/09    MPCC CORP.                          
                                                            SH-GC-25       15,999                  12/08/08   01/22/09    MPCC CORP.                          
                                                            SH-GC-26       20,225                  11/19/08   01/27/09    MPCC CORP.                          
                                                            SH-GC-27       20,210                  11/19/08   01/27/09    MPCC CORP.                          
                                                            SH-GC-28       18,479                  01/02/09   04/13/09    MPCC CORP.                          
                                                            SH-GC-29       24,600                  01/27/09   04/03/09    MPCC CORP.                          
                                                            SH-GC-30       20,157                  01/27/09   04/03/09    MPCC CORP.                          
                                                            SH-GC-31      -29,295                  01/27/09   04/03/09    MPCC CORP.                          
                                                            SH-GC-32      -42,500                  01/27/09   04/03/09    MPCC CORP.                          
                                                            SH-GC-33        6,612                  06/30/09   08/14/09    MPCC CORP                           
                                                            SH-GC-34        6,671                  06/30/09   08/14/09    MPCC CORP                           
                                                            SH-GC-35      -23,968                  02/10/10   05/26/10    MPCC CORP                           
                                                            SH-HC-01        4,111                  04/07/08   08/07/08    JNS HEATING SERVICES, INC.          
                                                            SH-HC-02        6,872                  04/07/08   08/07/08    JNS HEATING SERVICES                
                                                            SH-HC-03       21,539                  04/07/08   08/07/08    JNS HEATING SERVICES                
                                                            SH-HC-04       21,553                  04/07/08   08/08/08    JNS HEATING SERVICES, INC.          
                                                            SH-HC-05       12,589                  04/07/08   08/08/08    SCHENECTADY STEEL                   
                                                            SH-HC-06       14,554                  11/19/08   06/25/09    JNS HEATING SERVICE, INC.           
                                                            SH-HC-07       11,950                  11/19/08   01/27/09    JNS HEATING SERVICE, INC.           
                                                            SH-HC-08       -2,105                  01/25/10   03/18/10    JNS HEATING SERVICE INC             
                                                            SH-PC-01      -27,495                  04/07/08   08/04/08    PEARL RIVER PLUMBING                
                                                            SH-PC-02       19,929                  04/07/08   08/07/08    PEARL RIVER PLUMBING                
                                                            SH-PC-03       12,095                  04/07/08   08/07/08    PEARL RIVER PLUMBING                
                                                            SH-PC-04       22,250                  04/07/08   08/07/08    PEARL RIVER PLUMBING                
                                                            SH-PC-05       19,275                  04/07/08     /  /      TALT ELECTRIC                       
                                                            SH-PC-05       19,275                  04/07/08   08/07/08    PEARL RIVER PLUMBING                
                                                            SH-PC-06       25,000                  04/07/08   08/07/08    PEARL RIVER PLUMBING                
                                                            SH-PC-23        9,589                  04/12/12   10/18/13    PEARL RIVER PLUMBING                
                                                            SH-SC-03        9,125                  04/07/08   08/04/08    EASTERN EXCAVATION                  
                                                            SH-SC-04        2,802                  04/07/08   08/04/08    EASTERN EXCAVATION, INC.            
                                                            SH-SC-06        7,582                  04/07/08   08/04/08    EASTERN EXCAVATION, INC.            
                                                            SH-SC-07       16,076                  04/07/08   08/04/08    EASTERN EXCAVATION, INC.            
                                                            SH-SC-08       21,492                  04/07/07   08/04/08    EASTERN EXCAVATION, INC.            
                                                            SH-SC-09        7,958                  04/07/07   08/04/08    EASTERN EXCAVATION, INC.            
                                                            SH-SC-10       15,614                  04/07/07   08/04/08    EASTERN EXCAVATION, INC.            
                                                            SH-SC-11        9,522                  04/24/08   08/06/08    EASTERN EXCAVATION, INC.            
                                                            SH-SC-13       11,352                  11/19/08   01/22/09    EASTERN EXCAVATION, INC.            
                                                            SH-SC-14       17,120                  11/19/08   01/22/09    EASTERN EXCAVATION INC.             
                                                            SH-SC-17       11,682                  06/30/09   08/14/09    EASTERN EXCAVATION INC              
                                                            SH-SC-18      133,462                  06/30/09   08/14/09    EASTERN EXCAVATION INC              
                                                            SH-SC-19       11,418                  07/10/09   09/01/09    EASTERN EXCAVATION INC              
                                                            SH-SC-20        3,758                  04/12/12   12/19/12    EASTERN EXCAVATION INC              
                                                            SH-SS-01      -45,000                  04/07/08   08/08/08    SCHENECTADY STEEL                   
                                                            SH-SS-02       15,031                  04/07/08   08/08/08    SCHENECTADY STEEL                   
                                                            SH-SS-03        9,855                  04/07/08   08/08/08    SCHENECTADY STEEL                   
                                                            SH-SS-04       13,327                  04/07/08   08/05/08    SCHENECTADY STEEL                   
                                                            SH-SS-05       16,000                  04/07/08   08/04/08    SCHENECTADY STEEL                   
                                                            SH-SS-06       22,828                  04/07/08   08/04/08    SCHENECTADY STEEL                   
                                                            SH-SS-07       18,927                  04/07/07   08/04/08    SCHENECTADY STEEL                   
                                                            SH-SS-08       18,502                  05/01/08   08/05/08    SCHENCTADY STEEL                    
                                                            SH-SS-09       18,061                  06/16/08   08/05/08    SCHENECTADY STEEL CO.               
                                                            SH-SS-10       19,414                  05/01/08   08/05/08    SCHENECTADY STEEL                   
                                                            SH-SS-11       17,736                  02/27/09   04/23/09    SCHENECTADY STEEL                   
                                                            SH-SS-12       16,351                  02/27/09   04/23/09    SHENECTADY STEEL                    
                                                            SH-SS-13       13,000                  01/25/10   03/18/10    SCHENECTADY STEEL                   
                                                            SH-SS-14       13,914                  01/25/10   03/18/10    SCHENECTADY STEEL                   
                                                            SH-SS-15        8,500                  01/25/10   03/18/10    SCHENECTADY STEEL                   
                                                            SHEC14         18,523                  11/19/08   07/21/09    TALT ELECTRIC                       
 
10-1144   Reconstruction               0-005-012  12/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1518   Reconstruction               0-005-013  10/22/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL-1          -12,227                  04/11/16   04/13/16    Edward J. Napoleon                  
                                                            G1-1-1          6,260                  03/21/16   03/29/16    Lamuer Roofing Co. Inc.             
 
16-0502   Reconstruction               0-005-014  09/23/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0435   Reconstruction               0-005-015  06/20/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1899   Reconstruction               0-005-016  06/15/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0844   Reconstruction               0-005-017  03/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1076   Reconstruction               0-005-018  11/19/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1957   Reconstruction               0-005-019  11/19/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0918   Additions and Alterations    0-005-020  05/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1931FA Reconstruction               0-005-021  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0164   Reconstruction               0-005-022  12/15/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0783EP Energy Project               0-005-E01  02/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Winfield L. Morse Elementary:
91-0890   Reconstruction               0-006-002  04/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0284   Reconstruction               0-006-006  10/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0622   Reconstruction               0-006-009  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-01           15,753                  05/22/06   08/08/06    Milcon Construction                 
 
10-1145   Reconstruction               0-006-010  12/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1519   Reconstruction               0-006-011  12/31/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -49,090                  04/07/16   04/18/16    Louis Calicchia                     
                                                            G1-3-1         13,690                  03/21/16   03/29/16    Laumar Roofing Co. Inc.             
 
16-0436   Reconstruction               0-006-012  07/20/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GCCO-01         2,231                  11/29/18   01/10/19    EMPIRE ENERGY SPECIALISTS, INC.     
 
16-0438   Reconstruction               0-006-013  07/20/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0845   Reconstruction               0-006-014  03/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0919   Reconstruction               0-006-015  05/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0851   Reconstruction               0-006-016  01/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0784EP Energy Project               0-006-E01  02/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg.:
91-1185   Reconstruction               1-003-001  05/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0785   Reconstruction               1-003-002  02/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1274   Reconstruction               1-003-004  04/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1624   Reconstruction               1-003-005  06/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1146   Reconstruction               1-003-006  12/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1411   Reconstruction               1-003-007  06/09/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2-1          -11,735                  01/19/17   01/25/17    Milcon Construction Corp.           
 

          Grounds Garage:
13-1521   New Construction             3-022-001  12/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-AD-01            0                  08/31/17   10/04/17    Naber Electric Corp.                
                                                            EC-AD-02            0                  12/04/17   12/15/17    Naber Electric Corp.                
                                                            EC-CO-02        3,508                  12/04/17   12/15/17    Naber Electric Corp.                
                                                            EC-CO-03        4,963                  01/18/18   03/28/18    Naber Electric Corp.                
                                                            G1            -20,000                  04/13/16   10/05/16    Sentrale Construction Corp.         
                                                            GC-AD-01            0                  01/18/18   02/05/18    Nurzia Construction Corporation     
                                                            GC-AD-03            0                  01/18/18   02/05/18    Nurzia Construction Corporation     
                                                            GC-CO-01      -20,818                  10/11/18   11/13/18    NURZIA CONSTRUCTION CORP            
                                                            GC-CO-01       -5,000                  03/26/19   04/01/19    VINCO BUILDERS                      
                                                            GC-CO-02      -71,125                  10/11/18     /  /      NURZIA CONSTRUCTION CORP            
                                                            GCAD-02A            0                  01/18/18   02/05/18    Nurzia Construction Corporation     
                                                            GCAD-02B            0                  01/18/18   02/05/18    Nurzia Construction Corporation     
                                                            PC-AD-01            0                  08/31/17   10/04/17    Southeast Plumbing Corporation      
                                                            PC-AD-02            0                  08/31/17   10/04/17    Southeast Plumbing Corporation      
                                                            PC-AD-03            0                  01/18/18   03/28/18    Southeast Plumbing Corporation      
                                                            PC-CO-01          731                  01/18/18   03/28/18    Southeast Plumbing Corp.            
 

          New Bus Garage-Lease RENEWAL:
01-0581   Reconstruction               5-013-L01  01/28/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0000   Reconstruction               5-013-L02  11/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
19-1482   New Construction             7-029-001  03/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE

IRVINGTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-02-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Street School (fmly MS):
92-0995   Additions and Alterations    0-001-006  05/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0671   Reconstruction               0-001-007  03/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1718   Reconstruction               0-001-010  04/21/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              16,944                  10/21/04   11/24/04    Sea Breeze Gen. Const.              
                                                            2               3,817                  10/26/04   11/24/04    Sea Breeze Gen. Const.              
 
08-1504   Reconstruction               0-001-012  07/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            10,074                  06/29/11   07/18/11    HEALY ELECTRIC CONTRACTING INC      
                                                            002             5,115                  06/29/11   07/18/11    HEALY ELECTRIC CONTRACTING INC      
                                                            003             3,514                  06/29/11   07/18/11    HEALY ELECTRIC CONTRACTING INC      
 
09-1531   Reconstruction               0-001-013  07/13/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -1,262                  06/29/11   07/27/11    UAP INC                             
 
11-1448   Reconstruction               0-001-014  08/14/12  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1717   Reconstruction               0-001-016  11/29/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             86,600                  10/20/22     /  /      Grace Contr&Devlp LLC               
                                                            G2            -15,914                  01/18/23   12/15/23    GRACE CONTRACTING & DEVELOPMENT LLC 
                                                            G3             -2,979                  02/09/23   12/15/23    GRACE CONTRACTING & DEVELOPMENT LLC 
 
20-0996   Reconstruction               0-001-017  03/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2307FP Reconstruction               0-001-FP1  08/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dows Lane Elementary:
92-0670   Reconstruction               0-002-004  03/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1519   Additions and Alterations    0-002-005  08/20/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1607   Reconstruction               0-002-007  06/29/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0202   Reconstruction               0-002-010  11/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DL EL-1        -2,222                  11/19/01   02/20/02    Naber Elec.                         
                                                            DL EL-2         1,736                  11/19/01   02/20/02    Naber Elec.                         
                                                            DL EL-3         9,855                  11/19/01   02/20/02    Naber Elec.                         
                                                            DL EL-4         6,510                  11/19/01   02/20/02    Naber Elec.                         
                                                            DL EL-5         6,237                  11/19/01   02/20/02    Naber Elec.                         
                                                            DL EL_6         1,948                  11/19/01   02/20/02    Naber Elec.                         
                                                            IW 2            8,233                  06/05/09   12/22/09    Industrial Window Corp              
 
08-1505   Reconstruction               0-002-013  07/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,261                  06/29/11   07/18/11    VERNON HILLS CONTRACTING CORP       
 
09-1572   Reconstruction               0-002-014  07/13/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            50,000                  06/29/11   07/27/11    VERNON HILLS CONTRACTING CORP       
 
11-1327   Reconstruction               0-002-016  10/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              66,999                  06/13/16   07/08/16    PEARL RIVER P & H                   
 
14-0440   Reconstruction               0-002-017  07/20/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1730   Reconstruction               0-002-019  08/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1478   Reconstruction               0-002-020  04/17/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1            -128,917                  08/22/23   08/22/23    BEST CLIMATE CONTROL                
 
20-1718   Reconstruction               0-002-021  11/29/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             -6,647                  03/17/23   12/19/23    IJZ ASSOCIATES INC.                 
 
20-0997   Reconstruction               0-002-022  03/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              52,557                  06/30/23   12/29/23    GRAYBAR ELECTRIC COMPANY            
 
02-2305FP Reconstruction               0-002-FP1  08/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Main St.Sch.Gym(frmrly MS Gym):
92-0672   Reconstruction               0-004-001  03/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0997   Reconstruction               0-004-002  05/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1506   Reconstruction               0-004-003  07/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,245                  06/29/11   07/18/11    YOUNG EQUIPMENT SALES INC           
                                                            001             6,600                  06/29/11   07/18/11    NSC ABATEMENT SERVICES INC          
                                                            001            10,067                  06/29/11   07/18/11    EMPIRE ENERGY SPECIALISTS INC       
                                                            002             1,125                  06/29/11   07/18/11    YOUNG EQUIPMENT SALES INC           
                                                            002             3,000                  06/29/11   07/18/11    NSC ABATEMENT SERVICES INC          
                                                            03             16,735                  06/29/11   07/18/11    NSC ABATEMENT SERVICES INC          
                                                            04             18,000                  06/29/11   07/18/11    NSC ABATEMENT SERVICES INC          
                                                            05              4,000                  06/29/11   07/18/11    NSC ABATEMENT SERVICES INC          
 
12-0169   Reconstruction               0-004-004  10/01/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0441   Reconstruction               0-004-005  07/20/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001             8,815                  06/24/16   07/08/16    Sun-Dance Energy Contractors, Inc.  
                                                            1               1,999                  06/13/16     /  /      STANDBACK GENERAL CONTRACTORS       
                                                            1               1,999                  06/24/16   07/08/16    Standback General Contractors, LLC  
 
20-0998   Reconstruction               0-004-006  03/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Irvington HS:
92-0994   Reconstruction               0-007-005  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0863   Reconstruction               0-007-006  04/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0368   Reconstruction               0-007-008  11/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1461SR Additions and Alterations    0-007-011  04/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0267   Additions and Alterations    0-007-011  05/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           15,800                  10/01/03   10/03/03    Piazza Brothers                     
                                                            1-02           18,395                  10/01/03   10/03/03    Piazza Brothers                     
                                                            1-03           15,311                  10/01/03   03/02/04    Piazza Brothers                     
                                                            1-04           17,265                  10/01/03   03/02/04    Piazza Brothers                     
                                                            1-05           16,499                  10/01/03   03/02/04    Piazza Brothers                     
                                                            1-06           -6,000                  10/25/04   10/27/04    Piazza Brothers                     
                                                            1-07           19,800                  10/25/04     /  /      Piazza Brothers                     
                                                            1-08           19,553                  10/25/04     /  /      Piazza Brothers                     
                                                            1-09           19,900                  10/25/04     /  /      Piazza Brothers                     
                                                            1-10           17,600                  10/25/04     /  /      Piazza Brothers                     
                                                            1-11           18,855                  10/25/04     /  /      Piazza Brothers                     
                                                            1-12           27,157                  10/25/04   10/27/04    Piazza Brothers                     
                                                            1-13           16,564                  10/25/04     /  /      Piazza Brothers                     
                                                            1-14           19,482           3,526  10/25/04   10/27/04    Piazza Brothers                     
                                                            1-15           18,353                  10/25/04     /  /      Piazza Brothers                     
                                                            1-16           19,400                  10/25/04     /  /      Piazza Brothers                     
                                                            1-17           19,230                  10/25/04     /  /      Piazza Brothers                     
                                                            1-18           17,138                  10/25/04     /  /      Piazza Brothers                     
                                                            1-19           19,954                  10/25/04     /  /      Piazza Brothers                     
                                                            1-20           18,000          18,000  10/25/04   10/27/04    Piazza Brothers                     
                                                            1-21           19,639                  10/25/04     /  /      Piazza Brothers                     
                                                            1-22           19,362                  10/25/04     /  /      Piazza Brothers                     
                                                            1-23           16,645                  10/25/04     /  /      Piazza Brothers                     
                                                            1-24           17,000          17,000  10/25/04   10/27/04    Piazza Brothers                     
                                                            1-25           19,305                  10/25/04     /  /      Piazza Brothers                     
                                                            1-26           16,677                  10/25/04   10/27/04    Piazza Brothers                     
                                                            1-27          -60,000                  10/25/04   10/27/04    Piazza Brothers                     
                                                            1-28           17,886                  10/25/04     /  /      Piazza Brothers                     
                                                            1-29           19,027                  10/25/04     /  /      Piazza Brothers                     
                                                            1-30           17,274                  10/25/04     /  /      Piazza Brothers                     
                                                            2-01           14,599                  10/21/04   10/27/04    Capstone Enterprises                
                                                            2-02            9,900                  10/21/04   10/27/04    Capstone Enterprises                
                                                            3-01            6,127                  10/21/04   10/27/04    Beneway Inc                         
                                                            3-02           16,905                  10/25/04     /  /      Beneway Inc                         
                                                            3-03            4,500                  10/21/04   10/27/04    Arrow Steel Window                  
                                                            3-04              621                  10/21/04   10/27/04    Beneway Inc                         
                                                            3-05            8,500                  10/21/04   10/27/04    Arrow Steel Window                  
                                                            4-01           17,541                  10/01/03   10/03/03    Naber Electric                      
                                                            4-02           15,000                  10/01/03   03/02/04    Naber Electric                      
                                                            4-03            4,402                  10/01/03   10/03/03    Naber Electric                      
                                                            4-04           10,474                  03/22/05   04/14/05    Naber Electric Corp                 
                                                            4-05           19,990          19,990  10/21/04   10/27/04    Naber Electric                      
                                                            4-07           60,500                  10/21/04   10/27/04    Talt Electric                       
                                                            4-07           18,069                  10/25/04     /  /      Naber Electric                      
                                                            4-08           19,000                  10/25/04     /  /      Naber Electric                      
                                                            4-09           19,000                  10/25/04     /  /      Naber Electric                      
                                                            4-10           10,342                  10/25/04     /  /      Naber Electric                      
                                                            5-01            2,724                  10/21/04   10/27/04    The ICAS Corp                       
                                                            5-02            5,081                  10/21/04   10/27/04    The ICAS Corp                       
                                                            5-03          -35,000                  10/21/04   10/27/04    The ICAS Corp                       
                                                            7-3             6,336                  10/21/04   10/27/04    Thyssen Krupp Elevator              
                                                            FA-1            2,897                  10/01/03   10/03/03    Naber Electric                      
                                                            FA-2           12,224                  10/01/03   10/03/03    Naber Electric                      
                                                            FA-4              563                  03/22/05   04/14/05    Naber Electric Corp                 
                                                            FA-5           16,008                  10/21/04   10/27/04    Naber Electric                      
                                                            FA-9            8,143           8,143  10/25/04   10/27/04    Naber Electric                      
                                                            GC-35           3,575                  10/04/04   10/27/04    Glenman Construction                
                                                            GC-36A            -69                  10/04/04   10/27/04    Glenman Construction                
                                                            GC-4C           1,233           1,233  10/04/04   10/27/04    Glenman Construction                
                                                            R-1                 0                  10/21/04   10/27/04    Hi Tech Contracting                 
                                                            R-10            8,990                  03/22/05     /  /      Hi Tech Contracting Corp            
                                                            R-11           16,500                  03/22/05   04/14/05    Hi Tech Contracting                 
                                                            R-2A            3,150                  10/21/04   10/27/04    Hi Tech Contracting                 
                                                            R-9            13,500                  03/22/05   04/15/05    Hi -Tech Contracting Corp           
                                                            R3-03           1,578                  10/25/04   10/27/04    Beneway Inc                         
                                                            R3-05         -10,000                  10/25/04   10/27/04    Beneway Inc                         
                                                            R3-06         -40,000                  10/25/04   10/27/04    Arrow Steel Window                  
                                                            S-1           100,000                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-10           34,416                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-11          176,500                  10/01/03     /  /      Northbrook Contracting              
                                                            S-12           15,600                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-13           14,120                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-14           -6,103                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-17            4,024                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-18          271,575                  10/01/03     /  /      Northbrook Contracting              
                                                            S-19            6,325                  10/01/03   03/02/04    Northbrook Contracting              
                                                            S-2            55,594          55,594  10/01/03   03/02/04    Northbrook Contracting              
                                                            S-20            8,140                  10/01/03   03/02/04    Northbrook Contracting              
                                                            S-21           -6,290                  10/01/03     /  /      Northbrook Contracting              
                                                            S-22            8,700                  10/01/03   03/02/04    Northbrook Contracting              
                                                            S-3             8,429           8,429  10/01/03   03/02/04    Northbrook Contracting              
                                                            S-5             9,500                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-6            19,995                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-7             7,321                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-8            13,860                  10/01/03   10/03/03    Northbrook Contracting              
                                                            S-9            11,850                  10/01/03   10/03/03    Northbrook Contracting              
 
11-0548   Reconstruction               0-007-016  03/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0336   Reconstruction               0-007-017  06/09/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0442   Reconstruction               0-007-018  07/20/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              42,832                  08/24/17   10/10/17    The LandTek Group, Inc.             
                                                            1 (AIA3)        4,042                  08/24/17   10/10/17    The LandTek Group, Inc.             
                                                            2              55,333                  08/24/17   10/10/17    The LandTek Group, Inc.             
 
20-0999   Reconstruction               0-007-019  03/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1             22,524                  06/30/23   12/29/23    GRAYBAR ELECTRIC COMPANY            
 
20-1904   Reconstruction               0-007-020  02/01/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1             74,925                  10/04/22     /  /      DeRosa Sports Const Inc             
                                                            C2             14,070                  10/04/22   07/27/23    DeRosa Sports Const Inc             
                                                            C3             22,477                  10/04/22   07/27/23    DeRosa Sports Const Inc             
                                                            C4             22,188                  10/04/22     /  /      DeRosa Sports Const Inc             
                                                            G1             -5,000                  06/02/23   01/02/24    RENU CONTRACTING RESTORATION        
                                                            H1              5,000                  06/02/23   01/02/24    MENGLER MECHANICAL                  
                                                            g2             -1,583                  06/21/23   12/26/23    RENU CONTRACTING                    
 
02-2306FP Reconstruction               0-007-FP1  08/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXTemp 2 C/R Modular @ Dows Lane El.:
99-0211   New Construction             0-012-001  01/03/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
00-1759   New Construction             0-013-001  11/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -63,955                  10/21/04   10/26/04    Elite Floors                        
                                                            1-02          -32,000                  10/21/04   10/26/04    Elite Floors                        
                                                            1-09           -3,852                  10/25/04   12/21/04    Elite Floors                        
                                                            3-01            9,086                  10/01/03   11/17/03    Arrow Steel Window                  
                                                            3-01            3,041                  10/21/04   10/26/04    Capstone Enterprises                
                                                            4-01          -75,000                  10/21/04   10/26/04    Talt Electric                       
                                                            4-05           10,377                  10/21/04   10/26/04    Talt Electric                       
                                                            4-06           11,041                  10/21/04   10/26/04    Talt Electric                       
                                                            4-09           15,573                  10/21/04   10/26/04    Talt Electric                       
                                                            4-10            7,657                  10/21/04   12/07/04    Talt Electric                       
                                                            4-12           15,449                  10/25/04   12/21/04    Talt Electric                       
                                                            4-14           16,980                  10/25/04   12/21/04    Talt Electric                       
                                                            4-15          -13,333                  03/22/05   03/31/05    talt Electric                       
                                                            6-01            1,285                  10/21/04   10/26/04    Singer Equipment Company            
                                                            7-1                 0                  10/21/04   10/26/04    Thyssen Krupp Elevator              
                                                            9-02            2,500                  10/21/04   10/26/04    The Nickerson Corp                  
                                                            FA-7            5,000                  10/25/04   12/21/04    Naber Construction                  
                                                            GC-1            9,449                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-10          15,195                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-11           3,530                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-12          30,386                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-13           5,066                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-14          29,731                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-16           4,134                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-17          19,606                  10/04/04     /  /      Glenman Construction                
                                                            GC-18           2,402                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-2                0                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-21          16,000                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-22          13,711                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-24           8,622                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-26          11,678                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-27           8,525                  10/21/04   10/26/04    Glenman Construction                
                                                            GC-30           8,868                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-31          18,726                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-34B          4,344                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-36B          2,962                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-37          18,262                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-38          11,505                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-47          19,621                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-48          18,750                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-49          30,000                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-5            9,539                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-52          19,500                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-53          19,763                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-56           8,788                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-57         125,000                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-59          17,316                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-6           11,816                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-60          18,267                  10/25/04   12/21/04    Glenman Construction                
                                                            GC-7           16,208                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-8            6,923                  10/01/03   11/17/03    Glenman Construction                
                                                            GC4A            3,508                  10/04/04   10/18/04    Glenman Construction                
                                                            P-11              781                  10/25/04     /  /      Joe Lombardo Plumbing               
                                                            P-12           17,000                  10/25/04   12/21/04    Joe Lombardo Plumbing               
                                                            P-1A           10,104                  10/21/04   12/07/04    Joe Lombardo Plumbing               
                                                            P-2            10,300                  10/21/04   10/26/04    Joe Lombardo Plumbing               
                                                            P-3             7,998                  10/21/04   10/26/04    Joe Lombardo Plumbing               
                                                            P-4               800                  10/25/04   12/21/04    Joe Lombardo Plumbing               
                                                            P-7           -25,900                  10/21/04   10/26/04    Joe Lombardo Plumbing               
                                                            P-9             6,807                  10/21/04   10/26/04    Joe Lombardo Plumbing               
                                                            R-3            15,500                  10/21/04   10/26/04    Hi Tech Contracting                 
                                                            R-4             4,800                  10/21/04   10/26/04    Hi Tech Contracting                 
                                                            R-5            12,300                  10/21/04   10/26/04    Hi Tech Contracting                 
                                                            R-6                 0                  10/21/04   10/26/04    Hi Tech Contracting                 
                                                            R-7                 0                  10/21/04   10/26/04    Hi Tech Contracting                 
                                                            R-8            -1,800                  10/21/04   10/26/04    Hi Tech Contracting                 
                                                            S-15            7,592                  10/01/03   12/05/03    Northbrook Contracting              
                                                            S-16            6,959                  10/01/03   12/05/03    Northbrook Contracting              
                                                            TSS-1             736                  10/01/03   12/05/03    Sound Stage Systems                 
 
14-0443   Reconstruction               0-013-004  07/20/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,033                  10/12/16   07/14/17    Healy Electrical Contracting, Inc.  
                                                            2              13,387                  07/03/17     /  /      Empire Energy Specialists Inc.      
 
19-1641   Reconstruction               0-013-005  08/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1            -26,819                  06/24/22   03/13/23    The Landtek Group Inc               
                                                            E1              2,927                  06/24/22     /  /      Healy Elec Contrg Inc               
                                                            G1              8,590                  06/24/22   03/13/23    Bertussi Contrs Inc                 
                                                            G2              8,600                  06/24/22   03/13/23    Bertussi Contr Inc                  
                                                            H1            -10,000                  06/24/22     /  /      ACS System Assocs Inc               
 
20-1000   Reconstruction               0-013-006  03/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Arts and Athletic Bldg.:
00-1462   New Construction             0-014-001  11/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10-01           3,950                  10/21/04   12/07/04    Theatrical Service Supplies         
                                                            10-02          17,978                  10/25/04     /  /      Theatrical Service Supplies         
                                                            3-04              500                  10/21/04   10/26/04    Arrow Steel Window                  
                                                            4-02           19,960                  10/21/04   10/26/04    Talt Electric                       
                                                            4-03           11,291                  10/21/04   10/26/04    Talt Electric                       
                                                            4-04            8,216                  10/21/04   10/26/04    Talt Electric                       
                                                            4-08            3,919                  10/21/04   12/07/04    Talt Electric                       
                                                            4-11           15,040                  10/21/04   12/07/04    Talt Electric                       
                                                            4-13           19,000                  10/25/04   12/07/04    Talt Electric                       
                                                            4-16           -6,666                  03/22/05   03/31/05    Talt Electric                       
                                                            4-17             -500                  03/15/06     /  /      talt Electric                       
                                                            7-01           -1,029                  10/21/04   10/26/04    Fourth Phase                        
                                                            7-2                 0                  10/21/04   10/26/04    Thyssen Krupp Elevator              
                                                            9-01            1,300                  10/21/04   10/26/04    The Nickerson Corp                  
                                                            9-03           14,264                  03/22/05   06/23/05    The Nickerson Corp                  
                                                            9-04           -2,500                  10/21/04   10/26/04    The Nickerson Corp                  
                                                            FA-3           -1,755                  10/01/03   11/17/03    Naber Elec.                         
                                                            FA-8            5,000                  10/25/04     /  /      Naber Elec.                         
                                                            GC-15           2,371                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-19           4,500                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-20               0                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-23           3,181                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-25          15,795                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-28           8,093                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-29           2,146                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-3           20,000                  10/01/03   11/17/03    Glenman Construction                
                                                            GC-32          19,058                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-33           8,796                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-36C           -200                  10/04/04   10/18/04    Glenman Construction                
                                                            GC-39          19,800                  10/25/04     /  /      Glenman Construction                
                                                            GC-40          19,491                  10/25/04     /  /      Glenman Construction                
                                                            GC-41          19,473                  10/25/04     /  /      Glenman Construction                
                                                            GC-42          19,302                  10/25/04     /  /      Glenman Construction                
                                                            GC-43          17,109                  10/25/04     /  /      Glenman Construction                
                                                            GC-44          70,779                  10/25/04     /  /      Glenman Construction                
                                                            GC-45          19,556                  10/25/04     /  /      Glenman Construction Corp           
                                                            GC-46          -4,352                  10/25/04     /  /      Glenman Construction                
                                                            GC-4B           5,151                  10/04/04   10/27/04    Glenman Construction                
                                                            GC-50          19,351                  10/25/04     /  /      Glenman Construction                
                                                            GC-51          18,110                  10/25/04     /  /      Glenman Construction                
                                                            GC-54          26,500                  10/25/04   12/24/04    Glenman Construction                
                                                            GC-55          18,727                  10/25/04     /  /      Glenman Construction Corp           
                                                            GC-58          10,208                  10/25/04     /  /      Glenman Construction                
                                                            GC-9            4,725                  10/01/03   11/26/03    Glenman Construction                
                                                            GC34A          13,539                  10/04/04   10/18/04    Glenman Construction                
                                                            P-10              651                  10/25/04     /  /      Joe Lombardo Plumbing               
                                                            P-13           80,000                  10/25/04     /  /      Joe Lombardo Plumbing               
                                                            P-1B            5,900                  10/26/04   12/07/04    Joe Lombardo Plumbing               
                                                            P-5               665                  10/26/04   12/07/04    Joe Lombardo Plumbing               
                                                            P-6            17,568                  10/21/04   12/07/04    Joe Lombardo Plumbing               
                                                            P-8            -9,100                  10/21/04   12/07/04    Joe Lombardo Plumbing               
                                                            R-12           11,600                  03/22/05   03/31/05    Hi Tech Contracting                 
                                                            R-13           13,600                  03/22/05   03/31/05    Hi tech Contracting Corp            
                                                            R-14           -4,578                  10/25/04     /  /      Hi Tech Contracting                 
                                                            R-2B            7,000                  10/21/04   10/26/04    Hi Tech Contracting                 
 
20-1719   Reconstruction               0-014-003  11/29/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1001   Reconstruction               0-014-004  03/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXStorage Shed @ Meszaros Field:
16-0249   New Construction             2-020-001  10/21/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Facilities Storage Building:
20-1720   New Construction             2-022-001  11/29/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            275,000                  01/18/23   11/16/23    GRACE CONTRACTING & DEVELOPMENT LLC 
                                                            G2              1,750                  01/18/23   11/16/23    GRACE CONTRACTING & DEVELOPMENT LLC 
                                                            G3             74,000                  03/03/23     /  /      GRECE CONTRACTING & DEVELOPMENT LLC 
 

          Press Box:
19-1479   New Construction             7-021-001  05/19/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Campus Learning Pavilion-AthleticBld:
19-1762   New Construction             7-023-001  08/31/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P1            -10,000                  06/24/22     /  /      Southeast Plumb Corp                
 

          Outdoor Restroom:
19-1567   New Construction             7-024-001  06/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -17,209                  09/08/22   08/22/23    Grace Contrg&Dev                    
 

          District-Wide:
95-1709   Reconstruction               7-999-001  07/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1563   Reconstruction               7-999-002  07/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1002   Reconstruction               7-999-003  03/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE

DOBBS FERRY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-03-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Dobbs Ferry Middle/High School:
92-1400   Reconstruction               0-001-001  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1399   Reconstruction               0-001-002  10/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0287   Reconstruction               0-001-003  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1516   Additions and Alterations    0-001-004  09/23/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001         26,796                  12/05/02   01/02/03    James Jennings                      
                                                            01-001         26,796                  04/17/08   08/04/08    JAMES A. JENNINGS CO., INC.         
                                                            01-002          6,512                  11/10/03   11/17/03    James Jennings                      
                                                            01-002          6,512                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-0026        46,759                  02/26/05   03/23/05    James Jennings                      
                                                            01-003         42,268                  11/10/03   11/17/03    James Jennings                      
                                                            01-003         42,268                  04/17/08   08/04/08    JAMES A JENNINGS CO., INC.          
                                                            01-004         24,569                  11/10/03   11/17/03    James Jennings                      
                                                            01-004         24,569                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-005          9,856                  11/10/03   11/17/03    James Jennings                      
                                                            01-005          9,856                  04/17/08   08/04/08    JAMES A JENNINGS CO. INC.           
                                                            01-006         72,291                  12/22/03   12/26/03    James Jennings                      
                                                            01-006         72,291                  04/17/08   08/04/08    JAMES A. JENNINS CO. INC.           
                                                            01-007         36,487                  12/22/03   12/26/03    James Jennings                      
                                                            01-007         36,487                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-008        103,460                  12/22/03   12/26/03    James Jennings                      
                                                            01-008        103,460                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-009         80,901                  12/22/03   12/26/03    James Jennings                      
                                                            01-009         80,901                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-010         29,704                  12/22/03   12/26/03    James Jennings                      
                                                            01-011         51,526                  02/18/04   04/07/04    James Jennings                      
                                                            01-011         51,526                  04/17/08     /  /      JAMES A. JENNINGS CO. INC.          
                                                            01-011 R       51,526                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-012         54,639                  02/18/04   04/07/04    James Jennings                      
                                                            01-012 R       54,639                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-013         20,273                  02/18/04   04/07/04    James Jennings                      
                                                            01-013         20,273                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-014         19,949                  02/18/04   04/07/04    James Jennings                      
                                                            01-014         19,949                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-015         13,244                  02/26/05   03/23/05    James Jennings Co                   
                                                            01-015         13,244                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-016         35,890                  02/26/05   03/23/05    James Jennings                      
                                                            01-016         35,890                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-018         22,880                  02/26/05   03/23/05    James Jennings                      
                                                            01-018         22,880                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-019          3,158                  02/26/05   03/23/05    James Jennings                      
                                                            01-019          3,158                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-020         24,000                  02/26/05   03/24/05    James Jennings Co                   
                                                            01-020         24,000                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-021         11,000                  02/26/05   03/24/05    James Jennings                      
                                                            01-021         11,000                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-022          9,818                  02/26/05   03/24/05    James Jennings                      
                                                            01-024          1,511                  02/26/05   03/24/05    James Jennings                      
                                                            01-025          8,468                  02/26/05   03/24/05    James Jennings                      
                                                            01-027          2,142                  02/26/05   03/24/05    James Jennings                      
                                                            01-028         18,461                  02/26/05   03/24/05    James Jennings                      
                                                            01-028         18,461                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-031         22,005                  01/08/07   02/09/07    James Jennings                      
                                                            01-031         22,005                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-032         35,224                  01/08/07   02/09/07    James Jennings Co                   
                                                            01-032         35,224                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-22           9,818                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-23           6,533                  02/26/05   03/24/05    James Jennings                      
                                                            01-23           6,533                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-24           1,511                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-25           8,468                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-26          46,759                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            01-27           2,142                  04/17/08   08/04/08    JAMES A. JENNINGS CO. INC.          
                                                            02-001         31,470                  04/16/08     /  /      MEZZ ELECTRIC INC.                  
                                                            02-002         28,553                  04/16/08     /  /      MEZZ ELECTRIC INC.                  
                                                            02-003         45,803                  04/17/08     /  /      MEZZ ELECTRIC INC.                  
                                                            02-004          2,342                  12/22/03     /  /      Mezz Electric                       
                                                            02-004          2,342                  04/17/08     /  /      MEZZ ELECTRIC INC.                  
                                                            02-004          2,342                  04/16/08     /  /      MEZZ ELECTRIC INC.                  
                                                            02-005         11,878                  04/07/04   04/27/04    Mezz Electric                       
                                                            02-006         12,187                  04/17/08     /  /      MEZZ ELECTRIC  INC.                 
                                                            02-007          3,269                  04/07/04   04/27/04    Mezz Electric                       
                                                            02-007          3,269                  04/16/08     /  /      MEZZ ELECTRIC INC.                  
                                                            03-001         22,984                  04/17/08     /  /      C & B PLUMBING & HEATING INC.       
                                                            03-002         14,835                  12/22/03     /  /      C&B Plumbing                        
                                                            03-002         14,835                  04/17/08     /  /      C & B PLUMBING & HEATING INC.       
                                                            03-003          5,461                  12/22/03   12/30/03    C&B Plumbing                        
                                                            04-002         11,452                  11/10/03   12/18/03    LJ Coppola                          
                                                            04-002         11,452                  04/17/08     /  /      L. J. COPPOLA INC.                  
                                                            04-003         18,276                  10/27/03   11/03/03    L. J. COPPOLA INC.                  
                                                            04-004          4,988                  11/10/03     /  /      LJ Coppola                          
                                                            04-005          3,310                  11/10/03   12/18/03    LJ Coppola                          
                                                            04-005          3,310                  04/17/08     /  /      L. J. COPPOLA INC.                  
                                                            04-006          9,044                  11/10/03     /  /      LJ Coppola                          
                                                            04-006          9,044                  04/17/08     /  /      L.J. COPPOLA INC.                   
                                                            04-007          4,988                  04/17/08     /  /      L. J. COPPOLA INC.                  
                                                            04-008         16,060                  02/18/04     /  /      LJ Coppola                          
                                                            04-008         16,060                  02/18/04     /  /      LJ Coppola                          
                                                            04-008         16,060                  04/17/08     /  /      L. J. COPPOLA INC.                  
                                                            04-008         16,060                  04/17/08     /  /      L. J. COPPOLA INC.                  
 
03-1590   Reconstruction               0-001-005  07/06/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01         -15,387                  06/03/05   06/14/05    Monpat Construction                 
 
05-1198   Reconstruction               0-001-006  11/28/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1228   Reconstruction               0-001-008  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            35,343                  11/20/09   12/23/09    DIGGINS MECHANICAL CORP             
                                                            001             4,036                  12/11/09   02/12/10    CON-TECH CONSTRUCTION TECHNOLOGY INC
                                                            001            24,600                  09/12/12   01/24/13    DATABASE TELECOMMUNICATIONS INC     
                                                            002            26,061                  11/20/09   12/23/09    DIGGINS MECHANICAL CORP             
                                                            003            14,881                  11/20/09   12/23/09    DIGGINS MECHANICAL CORP             
 
08-0856   Reconstruction               0-001-010  12/10/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0741   Reconstruction               0-001-011  02/18/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -6,500                  11/07/11   05/15/12    DP WOLFF INC                        
                                                            001           -22,331                  11/14/11   01/27/12    ROK-BUILT CONSTRUCTION INC          
                                                            001             2,200                  12/05/11   05/15/12    SOUTHEAST PLUMBING CORP             
                                                            001             1,037                  12/16/11   05/08/12    TALT INC                            
                                                            002            11,404                  11/07/11   05/15/12    DP WOLFF INC                        
                                                            002             6,877                  11/14/11   01/27/12    ROK-BUILT CONSTRUCTION INC          
                                                            002             3,971                  12/05/11   05/15/12    SOUTHEAST PLUMBING CORP             
                                                            002             1,482                  12/16/11   05/08/12    TALT INC                            
                                                            003             2,401                  11/07/11   01/13/12    DP WOLFF INC                        
                                                            003            12,910                  11/14/11   01/27/12    ROK-BUILT CONSTRUCTION INC          
                                                            003             2,778                  12/16/11   05/08/12    TALT INC                            
                                                            004             5,562                  11/23/11   03/16/12    ROK-BUILT CONSTRUCTION INC          
                                                            004             1,945                  12/16/11   05/08/12    TALT INC                            
                                                            005             1,630                  12/16/11   05/08/12    TALT INC                            
                                                            005             1,530                  03/23/12   10/23/12    ROK-BUILT CONSTRUCTION INC          
 
10-0134   Reconstruction               0-001-012  08/25/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001            69,000                  04/20/11   05/13/11    NSC ABATEMENT SERVICES INC          
 
10-0345   Reconstruction               0-001-013  10/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            24,200                  06/17/11   09/14/12    MILCON CONSTRUCTION CORPORATION     
 
12-0231   Reconstruction               0-001-016  03/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                           11,550                  08/19/13   11/25/13    A & J Construction of NY, Inc.      
                                                            002               544                  08/19/13   11/25/13    A & J Construction of NY, Inc.      
                                                            003             7,634                  08/19/13   11/25/13    A & J Constuction of NY, Inc.       
                                                            004             2,750                  08/19/13   11/25/13    A & J Construction of NY, Inc.      
                                                            005             1,859                  08/15/13   11/25/13    A & J Construction of NY, Inc.      
                                                            006            10,736                  08/19/13   11/25/13    A & J Construction of NY, Inc.      
                                                            GC-001         36,000                  04/20/16   05/10/16    Rok-Built Construction, Inc.        
                                                            GC-002         19,200                  04/20/16   05/10/16    Rok-Built Construction, Inc.        
                                                            GC-003          6,200                  04/20/16   05/10/16    Rok-Built Construction, Inc.        
                                                            GC-004          7,200                  04/20/16   05/10/16    Rok-Built Construction, Inc.        
 
15-0022   Reconstruction               0-001-017  03/24/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            20,000                  10/11/16   10/21/16    Applied Landscape Technologies      
                                                            002             5,027                  10/11/16   10/21/16    Applied Landscape Technologies      
                                                            003             2,200                  10/11/16   10/21/16    Applied Landscape Technologies      
                                                            004             2,105                  10/11/16   10/21/16    Applied Landscape Technologies      
                                                            EC-001        136,000                  07/21/17   10/25/17    Talt Electric, Inc.                 
                                                            EC-003          5,017                  12/11/17   06/05/18    Talt Electric, Inc.                 
                                                            EC-004         10,492                  12/11/17   06/05/18    Talt Electric, Inc.                 
                                                            EC-005            -10                  07/23/18   07/31/18    TALT ELECTRIC INC                   
                                                            GC-001         18,389                  06/12/17   06/19/17    earl River Plumbing & Heating d/b/a 
                                                            GC-002         18,147                  06/12/17   06/19/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-003        105,584                  08/07/17   10/25/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-004          3,808                  08/25/17   09/06/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-005         -3,200                  08/25/17   09/06/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-006-R       69,844                  10/16/17   11/27/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-007-R       16,497                  10/16/17   11/27/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-008-R        6,732                  10/16/17   11/27/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-009-R       43,174                  10/16/17   11/27/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-010-R        5,376                  10/16/17   11/27/17    Pearl River Plumbing & Heating d/b/a
                                                            GC-011          1,325                  12/11/17   02/13/18    Pearl River Plumbing & Heating d/b/a
                                                            GC-012        -18,389                  12/11/17   02/13/18    Pearl River Plumbing & Heating d/b/a
                                                            MC-001        191,545                  02/02/17   06/28/17    Pearl River Plumbing & Heating      
                                                            MC-002        176,823                  02/02/17   08/23/17    Pearl River Plumbing & Heating      
                                                            MC-003         92,143                  08/07/17   10/25/17    Pearl River Plumbing & Heating d/b/a
                                                            MC-004          4,254                  08/25/17   10/04/17    Pearl River Plumbing & Heating d/b/a
                                                            MC-005         -2,785                  08/25/17   10/04/17    Pearl River plumbing & Heating d/b/a
                                                            MC-006          8,062                  12/11/17   06/05/18    Pearl River Plumbing & Heating d/b/a
                                                            MC-007          5,424                  12/11/17   06/05/18    Pearl River Plumbing & Heating d/b/a
                                                            RC-001         -4,802                  04/05/17   04/07/17    J. Salvatore & Sons, Inc.           
 
20-0551   Reconstruction               0-001-019  03/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1-06         4,850                  12/17/21   01/23/23    NABER ELECTRIC                      
                                                            EC-14          16,242                  09/06/22   05/31/23    Naber Elec Corp                     
                                                            EC-4-01        28,790                  12/13/21   01/13/23    Naber Elec Corp                     
                                                            EC-4-02         4,034                  12/17/21   01/23/23    NABER ELCTRIC                       
                                                            EC-4-03         4,128                  12/17/21   01/23/23    NABER ELECTRIC                      
                                                            EC-4-04        10,889                  12/17/21   01/23/23    NABER ELECTRIC                      
                                                            EC-4-05         1,957                  12/17/21   01/23/23    NABER ELECTRIC                      
                                                            EC-4-07        18,727                  12/20/21   09/27/22    Naber Elec Corp                     
                                                            EC-4-08         1,530                  12/20/21   09/27/22    Naber Elec Corp                     
                                                            EC-4-09         3,516                  01/18/22   01/27/23    Naber Elec Corp                     
                                                            EC-4-10         1,263                  08/05/22   05/22/23    Naber Elec Corp                     
                                                            EC-4-11        17,926                  08/12/22   05/22/23    Naber Elec Corp                     
                                                            EC-4-13         3,654                  08/12/22   05/22/23    Naber Elec Corp                     
                                                            EC-4-15         8,645                  10/24/22   06/27/23    Naber Elec Corp                     
                                                            EC-4-16        10,741                  10/24/22   06/27/23    Naber Elec Corp                     
                                                            EC-4-17         1,155                  10/24/22   06/27/23    Naber Elec Corp                     
                                                            EC-4-18         2,032                  11/30/22   06/06/23    Naber Elec Corp                     
                                                            EC-4-19         2,298                  12/05/22   05/23/23    Naber Elec Corp                     
                                                            EC-4-20         1,585                  12/27/22   12/14/23    Naber Elec Corp                     
                                                            EC-4-21         5,028                  12/27/22   12/14/23    Naber Elec Corp                     
                                                            EC-4-22         4,899                  12/27/22   12/14/23    Naber Elec Corp                     
                                                            GC-1-01        10,288                  06/24/22   04/04/23    APS Contrg Inc                      
                                                            GC-1-02        25,392                  06/24/22   03/13/23    APS Contr Inc                       
                                                            GC-1-03         2,991                  09/06/22   12/21/23    APS Contrg Inc                      
                                                            GC-1-04        28,665                  09/06/22   08/22/23    APS Contrg Inc                      
                                                            GC-1-05        20,324                  02/02/23     /  /      APS CONTRACTING INC                 
                                                            GC-1-06         2,929                  02/02/23     /  /      APS CONTRACTING INC                 
                                                            GC-1-07        -1,237                  02/02/23   11/29/23    APS CONTRACTING INC                 
                                                            MHS-1-08       38,112                  06/15/23     /  /      APS CONTRACTING                     
                                                            MHS-1-09        6,795                  06/15/23     /  /      APS CONTRACTING                     
                                                            MHS-1-10       60,494                  06/15/23     /  /      APS CONTRACTING                     
                                                            MHS-2-01      -78,055                  03/27/23     /  /      NIKO K CONSTRUCTION                 
                                                            MHS-3-01       -6,492                  03/24/23   12/19/23    J&M HEATING & AIR CONDITIONING INC  
                                                            MHS-4-23        6,732                  04/03/23   12/21/23    NABER ELECTRIC CORP                 
                                                            MHS-4-24        4,567                  06/12/23   12/28/23    NABER ELECTRIC CORP                 
                                                            MHS-4-25        4,703                  06/12/23   12/28/23    NABER ELECTRIC CORP                 
                                                            MHS-4-26        5,098                  06/15/23   12/29/23    NABER ELECTRIC CORP                 
                                                            MHS-4-27       29,901                  06/15/23   12/29/23    NABER ELECTRIC GROUP                
 
06-0780SC Visual Structural Inspection 0-001-SC1  02/27/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0782SC Visual Structural Inspection 0-001-SC2  03/12/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Springhurst Elementary:
92-1401   Reconstruction               0-004-007  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0634   Additions and Alterations    0-004-008  02/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0288   Reconstruction               0-004-009  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0043   Additions and Alterations    0-004-010  11/05/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-006         15,686                  01/14/03   02/12/03    Piazza Bros.                        
                                                            01-009R        24,593                  01/14/03   02/12/03    Piazza Bros.                        
                                                            01-011          3,532                  12/17/02   01/02/03    Piazza Bros.                        
                                                            02-003         29,177                  12/05/02   01/02/03    Naber Elec.                         
                                                            02-004          6,324                  12/05/02   01/02/03    Naber Elec.                         
                                                            03-001          8,940                  12/05/02   01/02/03    C&B Plumbing                        
                                                            04-002         21,056                  12/05/02   01/02/03    Frank & Lindy                       
                                                            04-003          4,139                  12/05/02   01/02/03    Frank & Lindy                       
 
05-1199   Reconstruction               0-004-011  11/28/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0074   Reconstruction               0-004-013  07/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0785   Reconstruction               0-004-014  04/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0742   Reconstruction               0-004-015  04/27/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1448   Reconstruction               0-004-016  06/04/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0023   Reconstruction               0-004-017  02/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CON 005        86,894                  01/09/17   01/25/17    Con Tech Construction Technology, In
                                                            EC-001          6,638                  09/06/16   11/02/16    Talt Electric, Inc.                 
                                                            EC-002          8,479                  01/06/17   01/25/17    Talt, Inc. dba Talt Electric        
                                                            EC-003          4,740                  08/25/17   09/14/17    Talt Electric                       
                                                            MC-001         12,434                  10/16/17   11/08/17    MDS HVAC-R, Inc.                    
                                                            MC-002         26,247                  10/16/17   11/08/17    MDS HVAC-R, Inc.                    
                                                            MC-003        124,705                  11/20/17   02/05/18    MDS HVAC-R, Inc.                    
                                                            MC-004         92,977                  11/20/17   01/23/18    MDS HVAC-R, Inc.                    
                                                            MC-005          5,701                  11/20/17   01/29/18    MDS HVAC-R, Inc.                    
                                                            RC-001         12,582                  12/11/17   02/13/18    WB Contracting Corp.                
                                                            Site-001        3,900                  09/06/16   11/02/16    Con-Tech Construction Technology Inc
                                                            Site-002        7,500                  08/18/16   10/05/16    Con-Tech Construction Technology Inc
                                                            Site-003        8,049                  08/18/16   10/05/16    Con-Tech Construction Technology Inc
                                                            Site-004        1,958                  08/18/16   10/05/16    Con-Tech Construction Technology Inc
                                                            Site-006        7,018                  12/12/16   12/29/16    Con-Tech Construction Technology,Inc
                                                            Site-007       16,214                  12/12/16   12/29/16    Con-Tech Construction Technology,Inc
                                                            Site-008        2,593                  12/12/16   12/29/16    Con-Tech Construction Technology,Inc
                                                            Site-009       44,044                  12/12/16   01/23/18    Con-Tech Construction Technology,Inc
                                                            Site-010        4,138                  12/12/16   12/29/16    Con-Tech Construction Technology,Inc
                                                            Site-011        7,585                  12/12/16   12/29/16    Con-Tech Construction Technology,Inc
 
20-0552   Reconstruction               0-004-018  03/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1-02       -13,715                  06/03/22   05/15/23    Vinco Bldgs LLC                     
                                                            SC-2-01        29,984                  05/02/22   05/09/23    DeRosa Sports Const Inc             
                                                            SC-2-02        28,970                  05/13/22   04/20/23    DeRosa Sports Const Inc             
                                                            SC-2-03        -3,499                  06/13/22   03/30/23    DeRosa Sports Const Inc             
                                                            SES 1-01       21,834                  07/09/21   01/13/22    Vinco Builders LLC                  
 
03-1543SC Visual Structural Inspection 0-004-SC1  06/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE

HASTINGS-ON-HUDSON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-04-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Farragut School Complex (M/HS):
91-1063   Reconstruction               0-001-013  05/12/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1086   Reconstruction               0-001-014  05/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0778   Reconstruction               0-001-016  04/05/94  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
94-0583   Reconstruction               0-001-017  02/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0423   Reconstruction               0-001-019  11/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1345   Reconstruction               0-001-020  06/02/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0754   Reconstruction               0-001-021  07/31/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001            -3,600                  07/06/04   08/25/05    Piazza Brothers                     
                                                            002             4,175                  07/06/04   07/13/04    Atlantic Elec.                      
                                                            002            16,734                  07/06/04   04/20/06    Piazza Brothers                     
                                                            003            11,989                  07/06/04   07/13/04    Piazza Brothers                     
                                                            004             7,748                  07/06/04   07/14/04    Atlantic Elec.                      
                                                            005              -700                  07/06/04   09/27/04    Atlantic Elec.                      
                                                            01             60,327                  07/06/04   04/20/06    Mengler Mech.                       
                                                            01             25,288                  07/06/04   07/07/05    Atlantic Elec.                      
                                                            02             25,000                  07/06/04   07/13/04    Mengler Mech.                       
                                                            03            -17,524                  07/06/04   07/14/04    Mengler Mech.                       
                                                            03            221,999                  07/06/04   07/13/04    Altantic Elec.                      
                                                            04             -1,932                  07/06/04   04/20/06    Mengler Mech.                       
                                                            05             36,894                  07/06/04   07/25/05    Mengler Mechanical                  
                                                            06              4,950                  07/06/04   07/07/05    Mengler Mech.                       
                                                            07             34,437                  07/06/04   07/07/05    Mengler Mech.                       
                                                            1              40,000                  07/06/04   04/20/06    Melwood Contracting                 
                                                            1              12,000                  07/06/04   04/20/06    Derosa Tennis                       
                                                            1             -24,856                  07/06/04   02/22/06    Wescon Plumbing                     
                                                            1             -62,000                  07/06/04   04/21/06    Piazza Brothers                     
                                                            10              8,094                  07/06/04   08/24/05    Mengler Mech.                       
                                                            11             61,854                  07/06/04   07/07/05    Mengler Mech.                       
                                                            2               5,850                  07/06/04   07/13/04    Derosa Tennis                       
                                                            2              10,250                  07/06/04   08/24/05    Mengler Mech.                       
                                                            3              15,000                  07/06/04   04/20/06    Derosa Tennis                       
                                                            4               9,600                  07/06/04   04/20/06    Derosa Tennis                       
                                                            5               3,269                  07/06/04   07/13/04    Ohms Elec.                          
                                                            6               3,366                  07/06/04   04/20/06    Ohms Elec.                          
                                                            8             -18,751                  07/06/04   08/24/05    Mengler Mech.                       
                                                            9               2,852                  07/06/04   08/24/05    Mengler Mech.                       
 
01-0447   Reconstruction               0-001-024  03/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,972                  06/01/04     /  /      BBR Contracting                     
                                                            1              10,972                  09/21/05   11/29/05    BBR Contracting Corp                
                                                            2                 995                  06/01/04     /  /      BBR Contracting                     
                                                            2                 995                  09/21/05   11/29/05    BBR Contracting                     
                                                            3                 753                  06/01/04     /  /      BBR Contracting                     
                                                            3                 753                  09/21/05   11/29/05    BBR Contracting Corp                
                                                            4               1,445                  06/01/04     /  /      BBR Contracting                     
                                                            4               1,445                  09/21/05   11/29/05    BBR Contracting Corp                
                                                            5               3,290                  06/01/04     /  /      BBR Contracting                     
                                                            5               3,290                  09/21/05   11/29/05    BBR Contracting Corp                
                                                            6              17,250                  06/01/04     /  /      BBR Contracting                     
                                                            6              17,250                  09/21/05   11/29/05    BBR Contracting Corp                
                                                            7                   0                  06/01/04     /  /      BBR Contracting                     
                                                            7               5,838                  02/11/05   03/02/05    BBR Contracting Corp                
 
07-0697   Reconstruction               0-001-025  04/21/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0154   Reconstruction               0-001-026  11/24/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0575   Reconstruction               0-001-027  07/05/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1278   Reconstruction               0-001-028  07/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1279   Reconstruction               0-001-029  07/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0149   Reconstruction               0-001-031  07/28/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            C01           -43,500                  04/19/16   05/10/16    Landscape Unlimited, Inc.           
                                                            C03             5,249                  10/27/16   10/08/17    Landscape Unlimited, Inc.           
                                                            C04            -4,620                  10/05/17   11/27/17    Landscape Unlimited, Inc.           
                                                            C05            26,000                  03/16/17   03/30/17    Landscape Unlimited, Inc.           
                                                            C06            21,000                  10/26/17   11/16/17    Landscape Unlimited, Inc.           
                                                            CO2           -35,000                  07/14/16   10/06/16    LANDSCAPE UNLIMITED                 
                                                            CTC-03          1,840                  10/27/16   11/17/16    DeRosa Sports Construction, Inc.    
                                                            CTC01          -2,000                  09/21/16   10/08/17    DeRosa Sports Construction, Inc.    
                                                            CTC02          12,000                  09/21/16   10/08/17    DeRosa Sports Construction, Inc.    
                                                            E01            -3,183                  10/05/17   10/24/17    Talt Electric                       
                                                            G01            -1,145                  10/05/17   11/27/17    Milcon Construction Corporation     
                                                            H01           -10,034                  03/16/17   03/30/17    PRPHE dba, Bertussi's               
                                                            R01            -8,415                  09/21/16   10/17/16    Armor-tite Construction Corp.       
                                                            R02            -9,654                  09/07/17   10/10/17    Armor-tite Construction Corp.       
 
15-1508   Reconstruction               0-001-032  11/02/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1798   Reconstruction               0-001-033  11/03/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1419   Reconstruction               0-001-035  04/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H1             -2,300                  02/11/21   04/08/21    THERMODYNAMICS CORP.                
                                                            H2               -320                  06/23/21   03/10/22    Thermo Dynamics Corp                
                                                            R1            581,852                  05/24/21   07/22/21    ALLIANCE TRI-STATE CONSTRUCTION INC 
                                                            R2           -208,087                  03/28/22   01/30/23    Alliance Tri-State Const Inc        
 
20-1686   Reconstruction               0-001-036  07/27/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1               -252                  07/22/22   03/23/23    Healy Elec Contr Inc                
                                                            G1             60,775                  04/25/22     /  /      WJNorthridge Const Corp             
                                                            G2             46,570                  04/25/22     /  /      WJNorthridge Const Corp             
                                                            G3            -10,472                  04/25/22   05/09/23    WJNorthridge Const Corp             
                                                            G4             17,570                  06/07/22   05/08/23    WJ Northridge Const Corp            
                                                            M1            -17,702                  09/08/22     /  /      S&O Const Servs Inc                 
 
22-1528   Reconstruction               0-001-037  09/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1087EP Energy Project               0-001-E01  05/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1648SC Visual Structural Inspection 0-001-SC1  07/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hillside Elementary:
92-0015   Reconstruction               0-002-007  07/22/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1219   Reconstruction               0-002-008  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1213   Reconstruction               0-002-009  06/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0955   Reconstruction               0-002-010  04/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0584   Reconstruction               0-002-012  02/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0448   Reconstruction               0-002-014  03/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,325                  06/01/04   06/09/04    Hi-Tech Contracting                 
                                                            1              10,972                  11/15/07   12/15/07    BBR Contracting Corporation         
                                                            2                 995                  11/15/02   12/15/02    BBR Contracting Corporation         
                                                            3                 753                  11/15/07   12/15/07    BBR Contracting Corporation         
                                                            4               1,445                  11/15/02   12/15/02    BBR contracting Corporation         
                                                            5               3,290                  11/15/07   12/15/07    BBR Contracting Corporation         
                                                            6              17,250                  11/15/02   12/15/02    BBR Contracting Corporation         
                                                            7               5,838                  02/11/05   03/11/05    BBR Contracting Corporation         
 
01-0755   Reconstruction               0-002-015  07/31/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              5,145                  07/06/04   07/13/04    RLJ Elec.                           
 
02-0126   Reconstruction               0-002-016  02/19/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03             12,388                  07/08/05   07/25/05    mengler Mechanical Inc              
                                                            03             12,388                  08/24/05   09/01/05    Mengler Mechanical                  
                                                            04              8,000                  07/08/05   07/25/05    Mengler Mechanical Inc              
                                                            04              8,000                  08/24/05   09/01/05    Mengler Mechanical                  
 
07-0698   Reconstruction               0-002-017  04/21/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0933   Additions and Alterations    0-002-018  07/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,500                  04/07/11   05/06/11    SISCA NORTHEAST INC                 
                                                            1                 501                  04/07/11   05/06/11    TALT ELECTRIC                       
                                                            2                 404                  04/07/11   05/06/11    TALT ELECTRIC                       
                                                            3                 331                  04/07/11   05/06/11    TALT ELECTRIC                       
                                                            4                 543                  04/07/11   05/06/11    TALT ELECTRIC                       
                                                            5                 475                  04/07/11   05/06/11    TALT ELECTRIC                       
 
10-0576   Reconstruction               0-002-019  07/05/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1280   Reconstruction               0-002-020  07/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0150   Reconstruction               0-002-022  08/19/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1631   Additions and Alterations    0-002-025  12/01/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1             37,083                  07/22/22     /  /      Con-Tech Const Tech Inc             
                                                            E1              6,069                  04/28/22   03/23/23    All Bright Elec                     
                                                            E2             17,358                  04/28/22   03/23/23    All Bright Elec                     
                                                            E3             28,603                  04/28/22   03/23/23    All Bright Elec                     
                                                            E3             28,603                  12/14/22   12/18/23    All Bright Elec                     
                                                            E4              3,964                  06/07/22     /  /      All Bright Elec                     
                                                            G1             17,195                  04/28/22   05/22/23    APS Contr Inc                       
                                                            G2             77,934                  09/08/22   05/31/23    APS Contr Inc                       
                                                            H1              2,632                  06/30/22   05/16/23    Hi Tech Air Con Serv Inc            
 
19-1242   Reconstruction               0-002-026  04/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1              4,442                  06/23/21   03/14/22    Empire Energy Specialists           
                                                            R1            -45,000                  06/23/21   03/10/22    Niko K Construction                 
 
22-1529   Reconstruction               0-002-027  09/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0956EP Energy Project               0-002-E01  04/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Field Toilet Facility:
14-0456   New Construction             7-009-001  07/27/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Field Coaches Box:
14-0457   New Construction             7-010-001  07/27/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
95-1657   Reconstruction               7-999-001  06/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXResidence - demolished:
99-1639   Alterations                  9-003-001  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

ARDSLEY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-05-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Concord Road Elementary:
90-1762   Reconstruction               0-002-004  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0675   Reconstruction               0-002-006  03/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1222   Reconstruction               0-002-008  05/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1263   Reconstruction               0-002-009  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1228   Reconstruction               0-002-010  04/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1174   Reconstruction               0-002-011  04/22/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CRR-1          16,450                  11/04/03   11/04/03    Hi Tech Roofing                     
 
97-1308   Additions and Alterations    0-002-012  06/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1063   Reconstruction               0-002-013  05/04/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             10,421                  03/06/02   04/29/02    Lake Industrial Services            
                                                            1               2,000                  03/06/02   04/29/02    Puff, Inc                           
                                                            2              37,063                  03/06/02   04/29/02    Lumberman's Mutual Casualty         
                                                            3              -2,500                  03/06/02   04/29/02    Lumberman's Mutual Casualty         
                                                            CO-1            6,341                  06/30/06   07/05/06    Hi-Tech Contracting Corp.           
 
05-0804   Reconstruction               0-002-016  08/25/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,074                  10/05/07   01/28/08    GRUPPUSO PLUMBING                   
                                                            1                -568                  12/03/07   01/28/08    Hammond Electrical                  
 
07-1112   Reconstruction               0-002-017  05/27/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1615   Reconstruction               0-002-018  02/20/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0394   Reconstruction               0-002-020  04/17/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              38,527                  09/25/15   10/07/15    Nicky Diggs Excavation              
                                                            1               4,735                  11/17/15   01/15/16    J&M Heating & AC, Inc.              
                                                            1              -3,700                  04/28/16   05/09/16    Nua Construction                    
                                                            1              -8,250                  05/09/16   06/10/16    PETTNEIL RECREATION                 
                                                            1             -36,000                  06/24/16   07/08/16    Surge Incorporated                  
                                                            10                519                  11/03/16   12/13/16    Access Control                      
                                                            11              5,617                  11/03/16   12/13/16    Access Control                      
                                                            13              1,970                  11/03/16   12/13/16    C&M Door Controls, Inc.             
                                                            13             22,882                  12/01/16   12/29/16    Access Control                      
                                                            14              5,061                  09/26/16   10/24/16    Talt Electric                       
                                                            15              1,237                  09/26/16   10/24/16    Talt Electric                       
                                                            16              1,209                  09/26/16   10/24/16    Talt Electric                       
                                                            17                325                  05/03/17   05/10/17    Access Control                      
                                                            2                -416                  12/22/15   01/08/16    NICKY DIGGS                         
                                                            3              31,100                  09/25/15   01/22/18    C&M Door Controls Inc.              
                                                            3             -10,000                  06/24/16   09/30/16    Talt Electric                       
                                                            3               2,430                  08/04/16   01/11/17    Access Control Technologies         
                                                            4               4,095                  11/16/15   01/15/16    J&M Heating & AC, Inc.              
                                                            4               5,620                  04/28/16   05/09/16    C&M Door Constrols Inc.             
                                                            4              12,097                  06/24/16   09/30/16    Talt Electric                       
                                                            4               2,671                  08/04/16   01/11/17    Access Control Technologies         
                                                            6               2,212                  09/24/16   10/24/16    Access Control Tech.                
                                                            8              19,790                  05/09/16   06/20/16    C&M DOOR CONTROLS                   
                                                            9               2,531                  08/04/16   03/03/17    Talt Electric                       
 
13-1618   Reconstruction               0-002-021  08/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               3,895                  03/20/17   06/06/17    Pearl River Plumbing                
                                                            3               2,591                  03/20/17   06/06/17    Pearl River Plumbing dba, Bertussi's
 
17-0765   Reconstruction               0-002-022  03/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,499                  10/09/18   11/30/18    TONY CASALE INC                     
                                                            1            -162,000                  12/11/18   01/18/19    D'ONOFRIO GC CORP.                  
                                                            2              33,406                  10/09/18   11/30/18    TONY CASALE INC                     
                                                            2              14,322                  06/24/19   07/03/19    D'ONOFRIO GC CORP.                  
                                                            3               7,040                  02/19/19   03/15/19    TONY CASALE INC.                    
                                                            3               6,100                  12/19/19   01/10/20    D'ONOFRIO GC CORP.                  
                                                            4             -55,200                  02/19/19   03/15/19    TONY CASALE INC.                    
                                                            4             -25,000                  09/24/20   02/10/21    D'ONOFRIO GC GROUP                  
                                                            5              -3,390                  02/19/19   03/15/19    TONY CASALE INC.                    
 
17-1613   Reconstruction               0-002-023  03/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,000                  10/11/19   10/18/19    SOUTHEAST MECHANICAL                
                                                            1                 800                  12/19/19   12/31/19    ALL BRIGHT ELECTRIC                 
                                                            1             -18,480                  12/14/20   05/13/21    BERTUSSI CONTRACTING                
                                                            2               4,749                  01/03/20   01/21/20    ALL BRIGHT ELECTRIC                 
                                                            2               2,900                  01/03/20   01/21/20    SOUTHEAST MECHANICAL                
                                                            2             -20,000                  12/14/20   05/13/21    BERTUSSI CONTRACTING                
                                                            3               6,264                  01/03/20   01/21/20    ALL BRIGHT ELECTRIC                 
                                                            3            -108,500                  09/24/20   11/09/20    SOUTHEAST MECHANICAL                
                                                            4               4,851                  09/24/20   11/09/20    SOUTHEAST MECHANICAL                
                                                            4               4,375                  08/08/22   05/22/23    All Bright Elec                     
                                                            5               2,018                  09/24/20   11/09/20    SOUTHEAST MECHANICAL                
 
20-0496   Reconstruction               0-002-024  12/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1197   Reconstruction               0-002-025  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0437FP Reconstruction               0-002-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0372SC Visual Structural Inspection 0-002-SC1  10/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ardsley High School:
90-1763   Reconstruction               0-003-002  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0676   Reconstruction               0-003-008  03/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0485   Reconstruction               0-003-010  12/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0858   Reconstruction               0-003-013  04/20/94  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
 
02-0485   Reconstruction               0-003-014  05/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               2,426                  11/17/03   12/22/03    Gruppuso Plumbing                   
                                                            1               1,691                  12/17/03   12/24/03    Shore Line Elec.                    
                                                            1              -1,621                  03/22/04   04/23/04    Longo Assoc.                        
                                                            1              23,544                  06/30/05   07/21/05    All Phase Electric                  
                                                            1               2,640                  10/25/05   11/08/05    Peter Camilli                       
                                                            1               3,190                  11/09/05   11/23/05    Beneway Inc                         
                                                            2                -645                  06/23/04   06/24/04    Longo Assoc.                        
                                                            2              11,700                  03/31/05   01/11/06    Milcon Construction                 
                                                            3              19,400                  03/31/05   05/02/05    Milcon Construction                 
 
96-1229   Reconstruction               0-003-015  04/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0645   Additions and Alterations    0-003-016  02/22/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1176   Reconstruction               0-003-017  04/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1064   Reconstruction               0-003-018  05/04/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6                 470                  10/06/08   11/06/08    SOUTHEAST PLUMBING                  
 
99-1582   Reconstruction               0-003-019  06/07/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,800                  03/06/02   04/18/02    HBD Assoc.                          
                                                            1             169,780                  03/06/02   04/18/02    Landscape Unlimited                 
                                                            1               6,564                  12/01/04   12/06/04    New York Contracting                
                                                            2              14,500                  03/06/02   04/18/02    Landscape Unlimited                 
                                                            2               2,600                  03/06/02   04/18/02    New York Contracting                
                                                            3               2,500                  03/06/02   04/18/02    New York Contracting                
                                                            3              -6,007                  12/12/02   01/07/03    Landscape Unlimited                 
                                                            4               2,530                  03/06/02   04/18/02    New York Contracting                
                                                            4             -67,449                  06/27/03   07/07/03    Landscape Unlimited                 
 
99-1204   Reconstruction               0-003-020  05/01/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,870                  12/01/04   12/01/04    Atlantic Elec.                      
                                                            CO-1              752                  03/18/05   03/30/05    DAS Construction Corp               
                                                            CO-3           -2,000                  03/18/05   03/30/05    DAS Construction Corp               
                                                            Co-2            2,367                  03/18/05   03/30/05    DAS Construction Corp               
 
03-0533   Additions and Alterations    0-003-021  03/22/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,000                  01/26/06   07/05/06    Diggins Mechanical                  
                                                            1             -10,000                  09/08/06   10/24/06    Damiano                             
                                                            2               5,500                  01/09/06   06/30/06    diggins mechanical                  
                                                            2             -12,500                  05/25/07   12/28/07    Damiano  GC                         
                                                            2             -23,000                  07/23/07   10/28/07    All Phase Electrical                
                                                            3               5,720                  01/09/06   06/30/06    Diggins mechanical                  
                                                            E-1             4,334                  04/04/05   04/15/05    All Phase Electrical                
                                                            E-1             4,334                  04/04/05   04/15/05    All Phase Electrical                
                                                            H-4             9,867                  03/03/06   07/14/06    Diggins mcehanical                  
                                                            P-1            39,000                  11/09/05   11/23/05    Westcon Plumbing Heating            
                                                            P-2             5,101                  12/06/05   04/03/07    Wescon Plumbing Heating             
                                                            P-3               -31                  12/06/05   04/03/07    Wescon Plumbing Heating             
 
08-0889   Reconstruction               0-003-022  04/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               5,500                  08/17/09   09/16/09    FM CONTRACTING LLC                  
 
14-0395   Reconstruction               0-003-024  04/17/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1              40,900                  09/25/15   06/20/16    C&M Door Controls Inc.              
                                                            1               2,313                  08/04/16   03/03/17    Access Control Technologies         
                                                            11              2,448                  09/26/16   10/24/16    Talt Electric                       
                                                            11             22,020                  11/03/06   01/22/18    C&M Door Controls, Inc.             
                                                            12              5,061                  09/26/16   10/24/16    Talt Electric                       
                                                            14             15,830                  12/01/16   12/29/16    Access Control                      
                                                            15             -5,008                  05/03/17   05/10/17    Access Control                      
                                                            17              1,819                  09/26/16   10/24/16    Talt Electric                       
                                                            18            -15,811                  06/02/17   06/06/17    Access Control                      
                                                            18              1,819                  09/26/16   10/24/16    Talt Electric                       
                                                            2                 440                  11/25/15   01/07/16    J&M Heating & AC, Inc.              
                                                            2             -14,000                  06/24/16   09/30/16    Talt Electric                       
                                                            20            -51,300                  07/17/17   10/31/17    Talt Electric                       
                                                            3               3,600                  11/16/15   01/15/16    J&M Heating & AC, Inc.              
                                                            3               3,341                  02/11/16   03/14/16    Nicky Diggs                         
                                                            5               6,636                  09/26/16   10/24/16    Access Control Tech.                
                                                            6                -440                  11/25/15   01/07/16    J&M Heating & AC, Inc.              
                                                            6              -5,400                  05/09/16   06/10/16    C&M Door Controls Inc.              
                                                            6              15,122                  06/24/16   09/30/16    Talt Electric                       
                                                            8               4,249                  08/04/16   03/03/17    Talt Electric                       
                                                            8               1,039                  11/03/16   12/13/16    Access Control                      
 
13-1619   Reconstruction               0-003-025  08/29/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,950                  11/02/15   11/27/15    Pearl River Plumbing                
                                                            1              12,500                  09/26/16   10/25/16    Nicky Diggs Excavation              
                                                            4               2,273                  03/20/17   06/06/17    Bertussi's (Pearl River Plumbing)   
 
17-0766   Reconstruction               0-003-026  03/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              12,114                  09/14/18   11/26/18    PCI INDUSTRIES                      
                                                            1            -310,654                  10/09/18   11/30/18    HYGRADE INSULATORS INC              
                                                            2              32,799                  09/14/18   10/25/18    PCI INDUSTRIES                      
                                                            3               5,977                  11/06/18   01/02/19    PCI INDUSTRIES                      
                                                            4              24,227                  11/26/18   01/23/19    PCI INDUSTRIES                      
                                                            5             -43,428                  02/19/19   03/15/19    PCI INDUSTRIES                      
 
17-1614   Reconstruction               0-003-027  03/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,955                  10/11/19   10/18/19    ALL BRIGHT ELECTRIC                 
                                                            1               2,350                  01/03/20   01/21/20    SOUTHEAST MECHANICAL                
                                                            1             -80,000                  12/14/20   05/13/21    BERTUSSI CONTRACTING                
                                                            2               1,307                  12/19/19   12/31/19    ALL BRIGHT ELECTRIC                 
                                                            3               1,307                  10/11/19   10/18/19    ALL BRIGHT ELECTRIC                 
                                                            3               9,415                  01/03/20   01/21/20    ALL BRIGHT ELECTRIC                 
                                                            4               1,143                  01/03/20   01/21/20    ALL BRIGHT ELECTRIC                 
                                                            5             -71,900                  09/24/20   11/09/20    ALL BRIGHT ELECTRIC                 
                                                            6               3,673                  09/24/20   11/09/20    ALL BRIGHT ELECTRIC                 
 
22-1198   Reconstruction               0-003-029  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0438   Reconstruction               0-003-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0370SC Visual Structural Inspection 0-003-SC1  10/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ardsley Middle School:
90-1182   Reconstruction               0-006-005  03/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1233   Reconstruction               0-006-006  04/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1764   Reconstruction               0-006-007  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0677   Reconstruction               0-006-008  03/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1527   Reconstruction               0-006-009  07/02/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0584   Reconstruction               0-006-012  01/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1175   Reconstruction               0-006-013  04/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1173   Reconstruction               0-006-014  04/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1065   Reconstruction               0-006-015  05/04/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1150   Reconstruction               0-006-017  06/03/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-1             7,725                  10/22/02   12/02/02    JJ Curran and Son                   
 
00-1516   Reconstruction               0-006-018  05/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 765                  03/06/02   04/18/02    Atlantic Elec.                      
                                                            C-1             2,639                  06/13/02   07/10/02    Melwood Contracting                 
 
03-0897   Reconstruction               0-006-019  11/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               8,489                  06/30/05   07/22/05    Subolo Contracting                  
                                                            1               3,017                  10/27/05   12/07/05    northbrook Contracting              
                                                            1                 181                  03/29/06   04/21/06    Richards Contracting                
                                                            1                -500                  06/12/06   06/30/06    Industrial Window Corp              
                                                            1              23,544                  03/23/07   03/26/07    All Phase Electrical                
                                                            1               3,190                  03/23/07   03/26/07    Beneway inc                         
                                                            2               2,722                  11/09/05   01/17/06    northbrook Contracting              
                                                            2              17,648                  01/09/06   06/05/06    Subolo Contracting                  
                                                            2              14,630                  01/09/06   05/26/06    All Phase electrical                
                                                            2               3,986                  01/26/06   07/05/06    Beneway Inc                         
                                                            2              20,000                  03/23/07   05/09/07    Richards Conditioning               
                                                            5              -6,320                  03/29/06   06/05/06    Subolo Contracting                  
                                                            GC-3            8,953                  01/09/06   06/05/06    Subolo Contracting                  
                                                            GC-4            6,604                  01/09/06   06/05/06    subolo Contracting                  
                                                            MR-1           19,600                  11/09/05   12/02/05    robert Anderson co                  
                                                            P-3               371                  03/23/07   03/26/07    Beneway inc                         
                                                            S-3             5,218                  11/09/05   12/02/05    Northbrook contracting              
                                                            S-4             5,696                  11/09/05   12/02/05    Northbrook Contracting              
                                                            S-5            -4,178                  12/06/05   06/05/06    Northbrook Contracting              
                                                            S-6            12,931                  12/06/05   06/05/06    Northbrook Contracting              
                                                            s-7            34,060                  01/26/06   06/05/06    Northbrook Contracting Corp.        
 
06-1554   Reconstruction               0-006-021  06/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0734   Reconstruction               0-006-022  04/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0396   Reconstruction               0-006-023  04/17/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,745                  10/01/15   11/17/15    Surge Inc.                          
                                                            1               5,880                  12/22/15   01/08/16    RENU CONTRACTING                    
                                                            1               6,056                  02/11/16   03/14/16    Mengler Mechanical                  
                                                            1              13,374                  06/24/16   09/30/16    Talt Electric                       
                                                            10             -1,300                  09/26/16   10/24/16    C&M Door Controls, Inc.             
                                                            12              5,820                  11/03/06   01/11/17    C&M Door Controls, Inc.             
                                                            12              9,595                  12/01/16   12/29/16    Access Control Technologies         
                                                            16             -4,384                  05/03/17   05/10/17    Access Control                      
                                                            2              55,000                  09/25/15   01/31/18    C&M Door Controls Inc               
                                                            2               6,489                  12/22/15   01/08/16    RENU CONTRACTING                    
                                                            2               2,258                  08/04/16   01/11/17    Access Control Technologies         
                                                            3             -15,828                  06/24/16   07/08/16    Renu Contracting & Restoration      
                                                            4             -16,000                  08/04/16   03/03/17    Renu Contracting & Restoration      
                                                            5               2,750                  11/17/15   01/19/16    J&M Heating & AC, Inc.              
                                                            5               1,740                  04/28/16   05/09/16    C&M Door Controls Inc.              
                                                            5               8,569                  06/24/16   09/30/16    Talt Electric                       
                                                            7               2,350                  03/07/16   03/16/16    J&M Heating & AC, Inc.              
                                                            7               1,300                  05/09/16   06/10/16    C&M DOOR CONTROLS                   
                                                            7               2,212                  09/26/16   10/24/16    Access Control Tech.                
                                                            7               3,042                  10/24/16   11/02/16    Talt Electric                       
                                                            8               3,150                  03/07/16   03/16/16    J&M Heating &AC, Inc.               
                                                            9               2,090                  05/09/16   06/20/16    C&M DOOR CONTROLS                   
                                                            9                 519                  11/03/16   12/13/16    Access Control                      
 
17-0767   Reconstruction               0-006-024  03/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,701                  09/14/18   10/25/18    TONY CASALE                         
                                                            1            -151,738                  11/06/18   01/02/19    PUFF INC.                           
                                                            2              13,756                  10/09/18   11/30/18    TONY CASALE INC                     
                                                            3              10,034                  02/19/19   03/15/19    TONY CASALE INC.                    
                                                            4             -37,188                  02/19/19   03/15/19    TONY CASALE INC.                    
 
17-1615   Reconstruction               0-006-025  03/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,019                  12/19/19   12/31/19    ALL BRIGHT ELECTRIC                 
                                                            1               3,500                  12/19/19   12/31/19    SOUTHEAST MECHANICAL                
                                                            1             -28,490                  12/14/20   05/13/21    BERTUSSI CONTRACTING                
                                                            2               2,019                  10/11/19   10/18/19    ALL BRIGHT ELECTRIC                 
                                                            2               5,098                  01/03/20   01/21/20    ALL BRIGHT ELECTRIC                 
                                                            2              -4,500                  12/14/20   05/13/21    BERTUSSI CONTRACTING                
 
20-0497   Reconstruction               0-006-026  12/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              42,437                  09/18/23   09/18/23    Consolidated Edison Solutions Inc   
 
21-1898   Reconstruction               0-006-028  03/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1199   Reconstruction               0-006-029  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0436FP Reconstruction               0-006-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0371SC Visual Structural Inspection 0-006-SC1  10/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Primary School:
90-1765   Reconstruction               0-008-004  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0678   Reconstruction               0-008-005  03/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
03-1157   Reconstruction               1-007-004  03/22/04  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0097   Reconstruction               1-007-006  03/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,424                  12/19/19   12/31/19    SOUTHEAST MECHANICAL                
 
22-1200   Reconstruction               1-007-007  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
17-1358   Reconstruction               7-999-001  01/24/19  NO CHANGE ORDERS ON ELECTRONIC FILE

EDGEMONT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-06-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Seely Place Elementary School:
90-0751   Reconstruction               0-001-008  01/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0658   Reconstruction               0-001-009  01/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0773   Reconstruction               0-001-010  02/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0381   Additions and Alterations    0-001-011  02/02/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           2,418                  12/23/05   06/07/06    Villa Construction                  
                                                            00001          36,000                  12/23/05   10/13/06    Mard electrical Contracting         
                                                            00001           7,563                  12/23/05   01/19/06    J and M heating and Air Cond        
                                                            00001           1,300                  12/23/05   01/19/06    DP wolff                            
                                                            00001          58,503                  12/23/05   11/01/06    Adelphi Masonry                     
                                                            00001          14,713                  12/23/05   06/07/06    AOK iron Works                      
                                                            000011          4,545                  12/23/05   01/19/06    Mard Electrical Contracting         
                                                            00002           3,716                  12/23/05   06/07/06    Villa Construction                  
                                                            00002           2,000                  12/23/05   10/13/06    Mard Electrical Contracting         
                                                            00002            -935                  12/23/05   01/19/06    J and M heating and Air Cond        
                                                            00002           1,530                  12/23/05   01/19/06    DP Wolff                            
                                                            00002         -10,593                  12/23/05   06/07/06    Etre Associates                     
                                                            00002          60,000                  12/23/05   06/07/06    Adelphi Masonry                     
                                                            00002          50,628                  12/23/05   06/07/06    AOK iron Works                      
                                                            00003          16,500                  12/23/05   11/01/06    Villa construction                  
                                                            00003           3,874                  12/23/05   01/19/06    Mard electrical Contracting         
                                                            00003           3,288                  12/23/05     /  /      J and M heating and Air Cond        
                                                            00003           3,656                  12/23/05   01/19/06    Dp wolff Inc                        
                                                            00003           9,329                  12/23/05   06/07/06    Adelphi Masonry                     
                                                            00003          -3,240                  12/23/05   06/08/06    AOK Iron Works                      
                                                            00003           9,420                  12/23/05   11/01/06    Etre Associates                     
                                                            00004           3,055                  12/23/05   06/07/06    Villa Construction                  
                                                            00004           2,353                  12/23/05   01/19/06    Mard electrical Contracting         
                                                            00004           2,639                  12/23/05   10/12/06    J and M heating and Air Cond        
                                                            00004           2,700                  12/23/05   01/19/06    Dp wolff Inc                        
                                                            00004           3,900                  12/23/05   06/07/06    Adelphi Masonry                     
                                                            00004          37,412                  12/23/05   06/07/06    AOK iron Works                      
                                                            00004          13,026                  12/23/05   06/07/06    Etre Associates                     
                                                            00005          15,468                  12/23/05   06/07/06    Villa Construction                  
                                                            00005           1,910                  12/23/05   01/19/06    Mard Electrical                     
                                                            00005           2,624                  12/23/05   10/12/06    DP wolff Inc                        
                                                            00005           9,708                  12/23/05   06/07/06    Adelphi Masonry                     
                                                            00005           1,899                  12/23/05   06/07/06    AOK Iron Works                      
                                                            00005           1,250                  12/23/05   06/07/06    Etre Associates                     
                                                            00006             309                  12/23/05   06/07/06    Villa construction                  
                                                            00006          -1,207                  12/23/05   10/13/06    Mard electrical Contracting         
                                                            00006           4,501                  12/23/05     /  /      DP wolff Inc                        
                                                            00006           3,240                  12/23/05   06/07/06    Adelphi Masonry                     
                                                            00006          10,973                  12/23/05   06/07/06    AOK Iron Works                      
                                                            00006           6,200                  12/23/05   06/07/06    Etre associates                     
                                                            00007           1,371                  12/23/05   06/07/06    villa Construction                  
                                                            00007           1,824                  12/23/05   01/19/06    Mard electrical Contracting         
                                                            00007           2,129                  12/23/05   01/19/06    DP wolff                            
                                                            00007          -1,800                  12/23/05   06/07/06    Adelphi masonry                     
                                                            00008           6,972                  12/23/05   06/07/06    Villa Construction                  
                                                            00008           3,364                  12/23/05   10/13/06    Mard electrical Contracting         
                                                            00008             677                  12/23/05   01/19/06    Dp wolff Inc                        
                                                            00008          -1,600                  12/23/05   06/07/06    Adelphi Masonry                     
                                                            00009             317                  12/23/05   01/19/06    Mard electrical Contracting         
                                                            00009             584                  12/23/05   06/07/06    AOK iron works                      
                                                            0001            4,500                  12/23/05   06/07/06    Etre Associates                     
                                                            00010          24,937                  12/23/05   11/01/06    Villa Construction                  
                                                            00010           2,827                  12/23/05   01/19/06    Mard Electrical Contracting         
                                                            00010             668                  12/23/05   06/07/06    AOK Iron Works                      
                                                            00011           1,613                  12/23/05   06/07/06    Villa Construction                  
                                                            00012           7,499                  12/23/05   06/07/06    Villa Construction                  
                                                            00012             926                  12/23/05   01/19/06    Mard electrical Contracting         
                                                            00013           1,639                  12/23/05   06/07/06    Villa Construction                  
                                                            00013             284                  12/23/05   01/19/06    Mard Electrical Contracting         
                                                            00014           6,171                  12/23/05   06/07/06    Villa construction                  
                                                            00014           3,771                  12/23/05   01/19/06    Mard Electrical Contracting         
                                                            00015          12,965                  12/23/05   06/07/06    Villa construction                  
                                                            00015           6,640                  12/23/05   01/19/06    Mard electrical Contracting         
                                                            00016             760                  12/23/05   06/07/06    Villa construction                  
                                                            00016           2,330                  12/23/05   10/13/06    Mard electrical Contracting         
                                                            00017           5,320                  12/23/05   06/07/06    Villa Construction                  
                                                            00017           1,147                  12/23/05   01/19/06    Mard Electrical Contracting         
                                                            00018           3,860                  12/23/05   06/07/06    Villa Construction                  
                                                            00019           4,660                  12/23/05   06/07/06    Villa Construction                  
                                                            00020           3,200                  12/23/05   06/07/06    Villa Construction                  
                                                            00021           8,500                  12/23/05   06/07/06    Villa Construction                  
                                                            00022           6,900                  12/23/05   06/07/06    Villa construction                  
                                                            00023          14,075                  12/23/05   06/07/06    Villa Construction                  
                                                            00024          10,925                  12/23/05   06/07/06    Villa construction                  
                                                            00025           8,000                  12/23/05     /  /      Villa Construction                  
                                                            00025           8,000                  09/27/07     /  /      Villa Construction                  
                                                            00026           1,200                  12/23/05   06/07/06    Villa construction                  
                                                            00027           4,200                  12/23/05   06/07/06    Villa Construction                  
                                                            00028           4,050                  12/23/05   06/07/06    Villa Construction                  
                                                            00029             750                  12/23/05   06/07/06    Villa Construction                  
                                                            00030           1,924                  12/23/05   06/07/06    Villa Construction                  
                                                            00031           1,149                  12/23/05   06/07/06    Villa Construction                  
                                                            00033          -1,846                  12/23/05   06/07/06    Villa Construction                  
                                                            0007           -2,500                  12/23/05   06/07/06    AOK Iron Works                      
                                                            0009            4,066                  12/23/05   06/07/06    Villa construction                  
 
07-1016   Reconstruction               0-001-013  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0870   Additions and Alterations    0-001-014  05/18/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,711                  08/22/13   09/13/13    Arrow Steel Window                  
                                                            2              -4,675                  03/20/14   07/03/14    Arrow Steel Window                  
                                                            2              -4,765                  03/20/14     /  /      Arrow Steel Window                  
 
14-1340   Reconstruction               0-001-015  06/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -16,174                  01/23/17   01/27/17    Marfi Contracting Corp.             
 
15-0330   Reconstruction               0-001-016  05/20/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -48,375                  04/30/18   06/04/18    Renu Contracting & Restoration, Inc.
                                                            2               2,357                  06/18/18   07/31/18    RENU CONTRACTING & REST             
                                                            3             -25,167                  04/21/21   05/18/21    GRACE CONTRACTING                   
 
19-0151   Reconstruction               0-001-018  10/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,005                  03/22/21   05/20/21    NABER ELECTRICAL CORP.              
 
21-1082   Reconstruction               0-001-019  10/13/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0011   Reconstruction               0-001-020  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0870   Reconstruction               0-001-021  09/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jr/Sr High School Building A:
90-0641   Additions and Alterations    0-002-007  01/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1017   Reconstruction               0-002-012  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0673   Reconstruction               0-002-013  02/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,940                  12/05/11   02/28/12    ARROW STEEL WINDOW                  
                                                            1              -7,300                  05/25/12   06/22/12    Dimitri Enterprises, Inc.           
 
15-0331   Reconstruction               0-002-014  05/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Edgemont HS/Building B.:
07-0585   Reconstruction               0-004-005  11/26/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,656                  10/28/09   12/22/09    ALLSTAR ELECTRIC                    
                                                            1               3,920                  10/28/09   12/22/09    SISCA NORTHEAST INC                 
                                                            1               1,957                  10/28/09   12/22/09    D.P. WOLFF INC                      
                                                            1               2,800                  10/28/09   12/22/09    SOUTHEAST PLUMBING                  
                                                            2               2,841                  10/28/09   12/22/09    ALLSTAR ELECTRIC                    
                                                            2               1,568                  10/28/09   12/22/09    SISCA NORTHEAST INC                 
                                                            3               2,016                  10/28/09   12/22/09    SISCA NORTHEAST INC                 
 
07-1018   Reconstruction               0-004-006  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0418   Reconstruction               0-004-007  03/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,100                  12/05/11   02/28/12    NUA CONSTRUCTION CORP               
 

          High School Building C:
07-1019   Reconstruction               0-005-004  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2215   Reconstruction               0-005-005  08/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0674   Reconstruction               0-005-006  02/02/11  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0613   Reconstruction               0-005-008  02/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,199                  03/09/23     /  /      PETER A CAMILLI & SONS              
 

          High School Building D:
00-0066   Reconstruction               0-006-004  11/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0263   Reconstruction               0-006-005  10/29/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1020   Reconstruction               0-006-006  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0637   Reconstruction               0-006-007  10/22/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,000                  01/23/17   01/27/17    Landscape Unlimited, Inc.           
                                                            1             -30,500                  01/23/17   01/27/17    Avanti Building Construction        
                                                            1             -10,000                  12/13/17   02/13/18    RLJ Electric Corp.                  
                                                            2             -10,000                  01/23/17   01/27/17    Landscape Unlimited, Inc.           
 
21-0614   Reconstruction               0-006-009  02/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,200                  03/09/23   12/13/23    PETER A CAMILLI & SONS              
 

          Edgemont H S Gym Building:
07-1021   Reconstruction               0-007-005  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1700   Reconstruction               0-007-006  11/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,580                  05/25/10   06/15/10    Marfi Contracting Corp.             
 
13-0836   Reconstruction               0-007-007  04/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,626                  09/17/14   10/03/14    WB Contracting Corp.                
                                                            1              32,800                  09/17/14   10/03/14    Arrow Steel Window                  
                                                            2               6,150                  06/01/15   06/18/15    Arrow Steel Window                  
 

          Greenville Elementary School:
90-0574   Reconstruction               0-008-006  01/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0741   Additions and Alterations    0-008-007  07/13/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001             690                  12/23/05   06/08/06    Carmody Contracting                 
                                                            00001          -1,995                  12/23/05   06/08/06    Schenectady Steel                   
                                                            00001           2,039                  12/23/05   06/08/06    Adelphi Masonry                     
                                                            00001           5,398                  12/23/05   06/08/06    discover general Contracting        
                                                            00001          -5,020                  12/23/05   08/29/06    Precision Plumbing                  
                                                            00001           2,570                  12/23/05   08/29/06    Solar Electric Systems              
                                                            00001          12,920                  12/23/05   08/29/06    Landscape Unlimited                 
                                                            00002           1,465                  12/23/05   06/08/06    Carmody Contracting                 
                                                            00002          22,698                  12/23/05   06/08/06    schenectady Steel                   
                                                            00002          -3,000                  12/23/05   06/08/06    Adelphi masonry                     
                                                            00002           9,878                  12/23/05   06/08/06    Discover General Contracting        
                                                            00002           4,072                  12/23/05   12/08/06    Precision Plumbing                  
                                                            00002           2,070           2,070  12/23/05   12/08/06    solar Electric systems              
                                                            00002         175,000                  12/23/05   01/31/14    Landscape Unlimited                 
                                                            00003          25,000                  12/23/05   11/01/06    Landscape unlimited                 
                                                            00003             484                  12/23/05   06/08/06    Schenectady steel                   
                                                            00003           1,911                  12/23/05   06/08/06    Carmody Contracting                 
                                                            00003           8,431                  12/23/05   06/08/06    Adelphi Masonry                     
                                                            00003           4,873                  12/23/05   06/08/06    Discover General Contracting        
                                                            00003           3,647           3,647  12/23/05   12/08/06    solar Electric Systems              
                                                            00004            -356                  12/23/05   06/08/06    Schenectady Steel                   
                                                            00004           2,326                  12/23/05   06/08/06    Adelphi Masonry                     
                                                            00004           2,800                  12/23/05   06/08/06    Discover General Contracting        
                                                            00004           4,968           4,968  12/23/05   12/08/06    Solar Electric Systems              
                                                            00005           1,904                  12/23/05   06/08/06    Schenectady Steel                   
                                                            00005           5,536                  12/23/05   06/08/06    Discover General                    
                                                            00005             527                  12/23/05   08/29/06    Solar Electric Systems              
                                                            00006           1,127                  12/23/05   06/08/06    Schenectady Steel                   
                                                            00006             895                  12/23/05   06/08/06    Discover General Contracting        
                                                            00006          22,500                  12/23/05   08/29/06    solar Electric Systems              
                                                            00007           1,807                  12/23/05   06/08/06    Discover General Contracting        
                                                            00007           3,343                  12/23/05   08/29/06    solar electric Systems              
                                                            00008           1,422                  12/23/05   06/08/06    Discover General Contracting        
                                                            00008           1,955                  12/23/05   08/29/06    Solar Electrical Systems            
                                                            00009           2,036                  12/23/05   06/08/06    discover General Contracting        
                                                            00010          -2,530                  12/23/05   06/08/06    Discover General Contracting        
                                                            00011             280                  12/23/05   06/07/06    Discover General Contracting        
                                                            00012           4,718                  12/23/05   06/07/06    Discover General Contracting        
                                                            00014             262                  12/23/05   06/07/06    Discover General Contracting        
                                                            00015             234                  12/23/05   06/07/06    Discover General Contracting        
                                                            00016           1,477                  12/23/05   06/07/06    Discover General Contracting        
                                                            00017           3,434                  12/23/05   06/07/06    Discover General Contracting        
                                                            00018           3,695                  12/23/05   06/08/06    Discover Geneal Contracting         
                                                            00019          26,937                  12/23/05   06/08/06    Discover General Contracting        
                                                            00020             601                  12/23/05   06/07/06    Discover General Contracting        
                                                            00021           4,866                  12/23/05     /  /      Discovery General Contracting       
                                                            00022           1,535                  12/23/05   06/07/06    Discover General Contracting        
                                                            00023           2,477                  12/23/05   06/07/06    Discover General Contracting        
                                                            00024           1,364                  12/23/05   06/07/06    Discover General Contracting        
 
01-0548   Reconstruction               0-008-008  04/03/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1254   Reconstruction               0-008-010  05/30/06  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1443   Reconstruction               0-008-011  07/25/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1022   Reconstruction               0-008-012  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0735   Reconstruction               0-008-013  04/10/13  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1942   Reconstruction               0-008-014  04/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1424   Reconstruction               0-008-015  04/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -23,855                  07/01/10   09/07/10    AMB CONSTRUCTION INC                
 
09-1317   Reconstruction               0-008-016  06/04/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0946   Reconstruction               0-008-017  07/20/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              -3,532                  03/20/14   07/03/14    American Petroleum                  
 
14-0597   Reconstruction               0-008-018  12/30/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -23,500                  12/13/17   02/13/18    Niram, Inc.                         
 
15-0333   Reconstruction               0-008-019  05/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0152   Reconstruction               0-008-020  10/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1             -10,600                  04/01/22   02/22/23    Talt Elec                           
 
21-1083   Reconstruction               0-008-021  10/13/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School Arts Building:
07-1023   Reconstruction               0-009-005  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0502   Reconstruction               0-009-006  12/24/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0523   Reconstruction               0-009-007  08/25/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1073   Reconstruction               0-009-009  05/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,500                  01/23/17   01/24/17    NUA Construction                    
 
21-0615   Reconstruction               0-009-010  02/25/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jr/Sr High School Resource Building:
91-0648   Reconstruction               0-010-003  02/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1024   Reconstruction               0-010-004  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0598   Reconstruction               0-010-005  12/30/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,150                  10/19/15   11/19/15    Armor-Tile Construction             
 
15-0334   Reconstruction               0-010-006  05/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0815FB Reconstruction               0-010-007  02/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School Administration Bldg.:
90-0865   Reconstruction               0-011-004  02/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1514   Additions and Alterations    0-011-005  01/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          10,103                  12/23/05   08/29/06    Keyspan Energy Solutions            
                                                            00001           5,562                  12/23/05   08/29/06    Melwood Contracting                 
                                                            00001           3,500           3,500  12/23/05   12/08/06    Mezz Electric                       
                                                            00002           7,789                  12/23/05   08/29/06    Melwood Contracting Corp            
                                                            00003           7,051                  12/23/05   08/29/06    Melwood Contracting Corp            
                                                            00004           2,473                  12/23/05   08/29/06    Melwood Contracting                 
                                                            00005           3,975                  12/23/05   08/29/06    Melwood Contracting Corp            
                                                            00006             658                  12/23/05   08/29/06    Melwood Contracting Corp            
                                                            00007           2,193                  12/23/05   08/29/06    Melwood Contracting                 
                                                            00008           1,159                  12/23/05   08/29/06    Melwood Contracting Corp            
                                                            00009           2,143                  12/23/05   08/29/06    Melwood Contracting Corp            
 
03-1551   Reconstruction               0-011-006  05/14/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1442   Reconstruction               0-011-007  07/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,000                  04/04/07   04/04/07    Unitech Services Group              
 
07-1025   Reconstruction               0-011-008  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1318   Reconstruction               0-011-009  06/04/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0503   Reconstruction               0-011-010  12/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              77,000                  10/22/18   11/09/18    Niram, Inc.                         
                                                            2             -22,000                  11/04/19   11/08/19    NIRAM, INC.                         
 
14-0524   Reconstruction               0-011-011  08/25/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,328                  04/12/19   04/16/19    NICK'S ELECTRIC SERVICE             
 
15-0335   Reconstruction               0-011-012  05/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0616   Reconstruction               0-011-014  02/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,200                  03/09/23   12/13/23    PETER A CAMILLI & SONS              
 

          High School Building E:
00-1006   New Construction             0-016-001  08/02/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0000           -5,000                  12/23/05   04/23/07    Adelphi Masonry                     
                                                            00001          13,100                  12/23/05     /  /      Villa Construction                  
                                                            00001          20,634                  12/23/05   04/23/07    Adelphu Masonry                     
                                                            00001          27,282                  12/23/05     /  /      N Pico and sons Contracting         
                                                            00001             231                  12/23/05     /  /      The Hartford Roofing Co             
                                                            00001          21,818                  12/23/05   08/29/06    andron construction                 
                                                            00001          14,097                  12/23/05   08/29/06    Keyspan Energy Solutions            
                                                            00001          -3,195                  12/23/05   08/29/06    Mard Electrical Contracting         
                                                            00002           1,500                  12/23/05   04/23/07    Landscape Unlimited                 
                                                            00002          -6,000                  12/23/05   04/23/07    Villa Construction                  
                                                            00002          -3,000                  12/23/05   04/23/07    Adelphi Masonry                     
                                                            00002          -2,078                  12/23/05     /  /      N Pico and sons Contracting         
                                                            00002           5,207                  12/23/05   04/23/07    The hartford Roofing Co             
                                                            00002          -3,832                  12/23/05   08/29/06    Hertiage Plumbing                   
                                                            00002             479                  12/23/05   08/29/06    Keyspan Energy                      
                                                            00002           2,015                  12/23/05   12/08/06    Mard electrical Contracting         
                                                            00003          23,431                  12/23/05   08/29/06    N Pico and Sons Contracting         
                                                            00003             893                  12/23/05   12/08/06    Hertiage Plumbing                   
                                                            00003             886                  12/23/05   12/08/06    Keyspan Energy solutions            
                                                            00003           8,948           8,948  12/23/05   12/08/06    Mard Electrical Contracting         
                                                            00004          -2,500                  12/23/05   08/29/06    Landscape Unlimited                 
                                                            00004           1,008                  12/23/05     /  /      N Pico and Sons Contracting         
                                                            00004           4,890                  12/23/05   08/29/06    Hertiage Plumbing                   
                                                            00004             811                  12/23/05   12/08/06    Mard Electrical Contracting         
                                                            00005           4,765                  12/23/05     /  /      N Pico and sons Contracting         
                                                            00005             858                  12/01/06   12/08/06    Mard Electrical Contracting Corp.   
                                                            00006           4,071                  12/23/05     /  /      N Pico and sons Contracting         
                                                            00006           1,730                  12/23/05   08/29/06    Mard Electrical                     
                                                            00007           8,075                  12/23/05     /  /      N Pico and Sons Contracting         
                                                            00007          11,107          11,107  12/23/05   12/08/06    Mard electrical Contracting         
                                                            00008             400                  12/23/05   08/29/06    N pico and sons Contracting         
                                                            00008           1,430           1,430  12/23/05   12/08/06    Mard Electrical Contracting         
                                                            00009           1,012                  12/23/05     /  /      N Pico and Sons Contracting         
                                                            00009           5,640                  12/23/05   08/29/06    Mard Electrical Contracting         
                                                            00010             335                  12/23/05     /  /      N Pico and sons Contracting         
                                                            00011           8,126                  12/23/05     /  /      N Pico and Sons Contracting         
                                                            00012           3,011                  12/23/05     /  /      N pico and Sons Contracting         
                                                            00013           8,000                  12/23/05     /  /      N Pico and Sons Contracting         
                                                            00014           1,891                  12/23/05     /  /      N Pico and sons Contracting         
                                                            00015           4,177                  12/23/05     /  /      N pico and Sons Contracting         
                                                            00016           2,000                  12/23/05     /  /      N Picco and Sons Contracting        
                                                            00017          -5,207                  12/23/05     /  /      N Pico and Sons Contracting         
                                                            00018           3,390                  12/23/05     /  /      N Picco and Sons Contracting        
                                                            00019           4,644                  12/23/05     /  /      N Picco and sons Contracting        
                                                            00020           3,136                  12/23/05   04/23/07    N Picco and Sons Contracting        
                                                            0003              850                  12/23/05   08/29/06    Landscape Unlimited                 
                                                            BP0101        125,000                  12/23/05   12/08/06    Landscape Inlimited                 
 
07-1026   Reconstruction               0-016-002  09/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0340   Reconstruction               0-016-003  04/06/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              55,000                  05/08/18   05/11/18    Peter A. Camilli & Sons             
 

          Blanford Field - Press Box:
14-0638   New Construction             7-020-001  10/22/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Blanford Field - Restroom Building:
14-0639   New Construction             7-021-001  10/22/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
13-1231   Reconstruction               7-999-002  10/07/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -30,600                  03/03/16   03/09/16    Fillingeri Electrical               
 

GREENBURGH CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-07-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Highview School:
92-1447   Reconstruction               0-002-002  07/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0076   Reconstruction               0-002-003  10/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1722   Reconstruction               0-002-007  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0869   Additions and Alterations    0-002-008  06/14/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0862   Reconstruction               0-002-009  06/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-1            -9,000                  11/20/02   01/02/03    C&B Plumbing                        
 
16-1389   Reconstruction               0-002-011  09/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1076   Reconstruction               0-002-013  07/18/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -20,000                  07/17/23   12/27/23    ARMOR-TITE CONSTRUCTION CORP        
 

          Richard Bailey Elementary Sch.:
92-1448   Reconstruction               0-005-002  07/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0077   Reconstruction               0-005-003  10/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1723   Reconstruction               0-005-006  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0861   Reconstruction               0-005-007  06/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,430                  04/02/03   04/17/03    Fourmen Const.                      
                                                            1               3,725                  04/02/03   04/17/03    Carey & Walsh                       
                                                            3               1,428                  04/02/03   04/17/03    Gruppuso Plumbing                   
                                                            E-1            21,877                  04/02/03   04/17/03    All Phase Elec. Contracting         
                                                            E-2             1,386                  04/02/03   04/17/03    All Phase Elec. Contracting         
                                                            P-1             1,422                  11/20/02   01/02/03    Gruppuso Plumbing                   
 
08-1169   Reconstruction               0-005-010  03/11/09  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1077   Reconstruction               0-005-012  07/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2227   Reconstruction               0-005-013  08/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lee F. Jackson E.S.:
92-1449   Reconstruction               0-006-002  07/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0078   Reconstruction               0-006-003  10/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1483   Additions and Alterations    0-006-005  08/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0023   Reconstruction               0-006-006  09/22/00  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1724   Reconstruction               0-006-007  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1078   Reconstruction               0-006-011  07/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Woodlands Junior Senior High:
92-1450   Reconstruction               0-007-002  07/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0079   Reconstruction               0-007-003  10/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0331   Reconstruction               0-007-004  12/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0459   Reconstruction               0-007-005  12/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1725   Reconstruction               0-007-008  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0863   Reconstruction               0-007-009  06/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  01/13/04   02/17/04    Cygrec Contracting                  
                                                            1             -17,795                  01/13/04   02/17/04    Cygrec Contracting                  
 
08-1340   Reconstruction               0-007-011  06/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,429                  05/17/10   07/27/10    FOURMEN CONSTRUCTION INC            
                                                            001             3,900                  09/15/10   09/27/10    CLEAN AIR QUALITY SERVICE INC       
                                                            002             3,101                  05/17/10   07/26/10    FOURMEN CONSTRUCTION INC            
                                                            002               850                  09/15/10   09/27/10    CLEAN AIR QUALITY SERVICE INC       
                                                            003             4,202                  05/17/10   07/26/10    FOURMEN CONSTRUCTION INC            
                                                            003             1,377                  09/15/10   09/27/10    CLEAN AIR QUALITY SERVICE INC       
 
08-1339   Reconstruction               0-007-012  06/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            23,482                  02/05/10   03/19/10    ALL BRIGHT ELECTRIC INC             
                                                            01             10,482                  07/15/10   09/03/10    FOURMEN CONSTRUCTION                
                                                            02              2,039                  07/15/10   09/03/10    FOURMEN CONSTRUCTION                
                                                            03              1,755                  07/15/10   09/03/10    FOURMEN CONSTRUCTION                
 
16-1390   Reconstruction               0-007-013  09/22/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1391   Reconstruction               0-007-014  09/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1392   Reconstruction               0-007-015  11/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1073   Reconstruction               0-007-016  01/04/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -4,454                  03/11/19   03/14/19    MENGLER MECHANICAL, INC.            
 
17-1837   Reconstruction               0-007-017  04/10/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              21,400                  05/06/19   05/07/19    J. FLETCHER CREAMER & SON, INC.     
                                                            2              11,870                  05/06/19   05/07/19    J. FLETCHER CREAMER & SON, INC.     
 
17-1821   Reconstruction               0-007-018  04/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -25,000                  03/11/19   03/12/19    MENGLER MECHANICAL, INC.            
                                                            002           -72,547                  03/11/19   03/12/19    MENGLER MECHANICAL, INC.            
 
21-0116   Additions and Alterations    0-007-021  03/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1079   Reconstruction               0-007-022  07/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1345SC Visual Structural Inspection 0-007-SC1  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1346SC Visual Structural Inspection 0-007-SC2  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Early Childhood Ctr (Frmr Nursery):
92-1451   Reconstruction               0-011-002  07/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0080   Reconstruction               0-011-003  10/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1719   Reconstruction               0-011-007  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1080   Reconstruction               0-011-008  07/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXMansion/Admin BldgW PK (see 1-012):
93-0081   Reconstruction               0-012-002  10/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1721   Reconstruction               0-012-004  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1411   Reconstruction               0-012-005  06/30/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXGatehouse (see 1-019):
97-1720   Reconstruction               0-019-002  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg (fmly 0-012):
20-0649   Reconstruction               1-012-003  04/21/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Garage:
93-0082   Reconstruction               5-003-002  10/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1718   Reconstruction               5-003-006  07/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stadium Press Box:
15-1143   New Construction             7-021-001  11/15/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
00-1808   Reconstruction               7-999-002  11/26/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,422                  08/17/04   09/17/04    RLJ Elec.                           
                                                            1E            -80,656                  04/02/03   04/17/03    Bradley Elec.                       
                                                            2                 386                  08/12/04   08/13/04    RLJ Elec.                           
 

ELMSFORD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-09-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Hamilton High School:
93-0819   Reconstruction               0-001-004  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0916   Reconstruction               0-001-005  03/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0977   Reconstruction               0-001-006  03/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0911   Reconstruction               0-001-007  03/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1251   Reconstruction               0-001-008  04/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0344   Additions and Alterations    0-001-009  02/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0687   Reconstruction               0-001-010  03/22/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0929   Reconstruction               0-001-012  03/18/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1305   Reconstruction               0-001-014  06/01/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,300                  03/23/07   04/03/07    GC Environmental                    
                                                            2                 690                  03/23/07   04/03/07    GC Environmental                    
                                                            3              -5,750                  03/23/07   04/03/07    GC Environmental                    
 
09-1132   Reconstruction               0-001-015  10/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0905   Reconstruction               0-001-017  05/02/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0674   Reconstruction               0-001-019  01/25/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          29,000                  09/03/13   09/19/13    Marfi Contracting Corp.             
                                                            RC-02         -13,300                  12/30/13   02/04/14    Marfi Contracting Corp.             
 
13-1290   Reconstruction               0-001-020  08/22/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 -33                  09/04/14   10/16/14    Mengler Mechanical Inc.             
 
15-1411   Reconstruction               0-001-021  04/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            33,000                  12/07/16   12/08/16    United Roofing & Sheet Metal, Inc.  
                                                            002             3,004                  12/07/16   12/08/16    United Roofing & Sheet Metal, Inc.  
 
16-0250   Reconstruction               0-001-022  03/03/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003          1,484                  03/15/19   03/20/19    HEALY ELECTRIC CONTRACTING, CORP    
                                                            HHSGC001        4,536                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC002        4,104                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC003        1,600                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC004       40,602                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC005        2,579                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC006        3,402                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC007       79,060                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC008       48,262                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC009        1,770                  01/31/18   02/21/18    Divine Construction Corp            
                                                            HHSGC010       18,750                  05/07/18   04/22/20    DIVINE CONSTRUCTION CORP            
                                                            HSEC-001      337,000                  01/30/18   03/08/18    Healy Electric Contracting Corp.    
                                                            HSEC-002        6,051                  01/30/18   03/08/18    Healy Electric Contracting Corp.    
                                                            MC-001         71,000                  06/26/17   07/14/17    Mengler Mechanical, Inc.            
                                                            MC-002         10,799                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-003          4,017                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-004         11,903                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-005         10,515                  01/30/18   03/08/18    Mengler Mechanical, Inc.            
                                                            MC-006          2,318                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-007         11,784                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-008         12,000                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-009          1,659                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-010            511                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-011         13,660                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-012         13,719                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-013          6,890                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-014         -2,350                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-015         19,206                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-016          5,000                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-017          5,581                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-018         10,381                  01/30/18   03/08/18    Mengler Mechanical Inc.             
                                                            MC-019         65,257                  05/02/18   05/07/18    Mengler Mechanical                  
 
20-0978   Reconstruction               0-001-023  03/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,781                  09/30/21   12/01/22    DeRosa Sports                       
                                                            1               2,180                  01/18/22   01/27/23    C&M Door Controls Inc               
                                                            10            -73,578                  07/18/22   05/09/23    DeRosa Sports                       
                                                            11             30,056                  08/29/22   08/22/23    DeRosa Sports                       
                                                            12             17,362                  02/06/23   12/14/23    DEROSA SPORTS                       
                                                            2              11,738                  09/30/21   12/01/22    DeRosa Sports                       
                                                            3              42,039                  10/18/21   03/28/23    DeRosa Sports                       
                                                            4               7,102                  12/09/21   12/16/22    DeRosa Sports Const Inc             
                                                            5              26,669                  12/09/21   12/16/22    DeRosa Sports Const Inc             
                                                            6              23,691                  12/09/21   12/16/22    DeRosa Sports Const Inc             
                                                            7               9,687                  12/09/21   12/16/22    DeRosa Sports Const Inc             
                                                            8               3,922                  01/18/22   12/27/22    DeRosa Sports                       
                                                            9              32,709                  05/23/22   04/18/23    DeRosa Sprots                       
 
22-1942   Reconstruction               0-001-024  09/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Alice E. Grady Elementary:
95-0917   Reconstruction               0-002-004  03/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0978   Reconstruction               0-002-005  03/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0139   Additions and Alterations    0-002-006  11/13/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0395   Reconstruction               0-002-007  02/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1306   Reconstruction               0-002-008  06/01/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              40,975                  03/23/07   04/03/07    GC Environmental                    
                                                            2                 690                  03/23/07   04/03/07    GC Environmental                    
                                                            3              -3,845                  03/23/07   04/03/07    GC Environmental                    
 
09-1133   Reconstruction               0-002-009  10/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1412   Reconstruction               0-002-012  04/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -50,424                  02/09/17   04/04/17    Foremost Development, LLC           
                                                            GC-001        -48,928                  06/26/17   06/30/17    Foremost Development, LLC           
 
16-0251   Reconstruction               0-002-013  03/10/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          2,102                  03/15/19   03/20/19    HEALY ELECTRIC CONTRACTING, CORP.   
                                                            GESGC001        9,175                  01/30/18   02/21/18    Divine Construction Corp            
                                                            GESGC002       11,830                  01/30/18   02/21/18    Divine Construction Corp            
                                                            GESGC003        5,841                  01/30/18   02/21/18    Divine Construction Corp            
                                                            GESGC004        1,770                  01/30/18   02/21/18    Divine Construction Corp            
                                                            PC-001            104                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
 

          Carl L Dixon School:
99-1275   Reconstruction               0-004-004  05/04/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1307   Reconstruction               0-004-005  06/01/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1                -400                  03/23/07   04/03/07    GC Environmental                    
                                                            2                 690                  03/23/07   04/03/07    GC Environmental                    
                                                            3              -2,865                  03/23/07   04/03/07    GC Environmental                    
                                                            4                 837                  05/15/07   08/07/07    GC environmental                    
 
09-1134   Reconstruction               0-004-006  10/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1413   Reconstruction               0-004-008  04/14/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            23,071                  02/09/17   04/04/17    Foremost Development, LLC           
                                                            GC-001         26,693                  06/26/17   06/30/17    Foremost Development, LLC           
 
16-0252   Reconstruction               0-004-009  03/10/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          3,363                  01/30/18   02/21/18    Divine Construction Corp            
                                                            PC-001            592                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
                                                            PC-002          7,193                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
 

          Dixon Annex:
09-1135   Reconstruction               0-005-002  10/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1414   Reconstruction               0-005-003  04/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            22,374                  02/09/17   04/04/17    Foremost Development, LLC           
                                                            GC-001         17,256                  06/26/17   06/30/17    Foremost Development, LLC           
 
16-0253   Reconstruction               0-005-004  03/06/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-001          3,349                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
                                                            PC-002          3,348                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
                                                            PC-003            217                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
                                                            PC-004            647                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
                                                            PC-005            653                  01/30/18   03/08/18    S&L Plumbing & Heating Corporation  
 

GREENBURGH-GRAHAM UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-10-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Martin Luther King Jr. Sch(SpclAct):
14-0912   Reconstruction               0-006-003  12/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Elementary School (SpecialActDis:
95-1392   New Construction             0-008-001  07/29/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,240                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            1              26,840                  12/05/06   05/07/07    Harmony Mechanical Services         
                                                            1              47,898                  12/05/06   05/07/07    Frank Lindy Plumbing Heating        
                                                            1              26,681                  12/05/06   05/07/07    Stack Electric                      
                                                            10             41,212                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            11             14,544                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            12              2,581                  12/05/06   05/07/07    MA Angeliades Inc                   
                                                            14             64,306                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            15             66,911                  12/05/06   05/07/07    MA Angeliades Inc                   
                                                            2              18,840                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            2              52,439                  12/05/06   05/07/07    Stack Electric                      
                                                            3              21,655                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            4              36,904                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            4              20,180                  12/05/06   05/07/07    Stack Electric                      
                                                            5              22,614                  12/05/06   05/07/07    MA Angeliades inc                   
                                                            6              40,015                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            6              63,000                  12/05/06   05/07/07    Stack Electric                      
                                                            7              47,783                  12/05/06   05/07/07    MA Angelkiades                      
                                                            7              50,202                  12/05/06   05/07/07    Stack Electric                      
                                                            8              28,223                  12/05/06   05/07/07    MA Angelkiades Inc                  
                                                            9             118,113                  12/05/06   05/07/07    MA Angeliades Inc                   
 
94-0175   Reconstruction               0-008-002  11/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0913   Reconstruction               0-008-004  12/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE

GREENBURGH ELEVEN UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-11-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Mary McLoud Bethune School(SpeclAct):
90-1614   New Construction             0-003-001  08/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1370   Additions and Alterations    0-003-002  10/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          2,739                  07/12/21   12/16/21    Fran Corp dba All Bright Electric   
                                                            EC-003            591                  07/12/21   12/16/21    Fran Corp dba All Bright Electric   
                                                            EC-004            565                  07/14/22   03/28/23    Fran Corp All Bright Elec           
                                                            EC-005         -1,168                  07/14/22   03/28/23    Fran Corp dba All Bright Elec       
                                                            EC-008          3,637                  07/14/22   03/28/23    Fran Corp dba All Bright Elec       
                                                            GC-001          1,117                  07/14/22     /  /      Light House Designs Inc             
                                                            GC-002          4,156                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-003          1,700                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-004          4,467                  07/14/22     /  /      Light House Designs Inc             
                                                            GC-005          1,238                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-006          2,875                  07/14/22     /  /      Light House Designs Inc             
                                                            GC-01           2,996                  05/10/21   08/27/21    ALL BRIGHT ELECTRIC                 
                                                            GC-011          5,866                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-012          5,014                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-013          3,651                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-014          2,107                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-015          3,748                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-016          5,929                  07/14/22   05/09/23    light House Designs Inc             
                                                            GC-017          8,309                  07/14/22   05/09/23    Light House Designs Inc             
                                                            GC-018          5,145                  07/14/22     /  /      Light House Designs Inc             
                                                            GC-019          2,475                  07/14/22     /  /      Light House Designs Inc             
                                                            GC-021          5,555                  11/25/22   09/19/23    LIGHT HOUSE DESIGNS                 
                                                            GC-022          2,905                  11/25/22   09/19/23    LIGHT HOUSE DESIGNS                 
                                                            GC-023          1,236                  11/25/22   09/19/23    LIGHT HOUSE DESIGNS INC             
                                                            GC-024            470                  11/25/22   09/12/23    LIGHT HOUSE DESIGNS INC             
                                                            GC-025         29,550                  11/25/22   09/12/23    LIGHT HOUSE DESIGNS INC             
                                                            GC-026         11,678                  11/25/22   09/12/23    LIGHT HOUSE DESIGNS INC             
                                                            GC-20          14,877                  07/14/22   05/09/23    Light House Designs Inc             
                                                            MC-003         21,091                  12/20/21   10/06/22    Light House Designs Inc             
                                                            MC-004            950                  12/10/21     /  /      Light House Designs Inc             
                                                            MC-005          1,656                  12/10/21   12/16/22    Light House Designs Inc             
                                                            MC-006          1,156                  08/03/22   05/22/23    Light House Designs Inc             
                                                            MC-008          6,274                  08/03/22   05/22/23    Light House Designs Inc             
                                                            PC-001          2,752                  04/21/21   08/04/21    S&L PLUMBING & HEATING CORP.        
                                                            PC-002          1,714                  05/10/21   08/17/21    S&L PLUMBING & HEATING CORP.        
                                                            PC-003          2,993                  07/12/21   12/16/21    S&L Plumbing & Heating              
 

GREENBURGH-NO.CASTLE(ST. CHRISTOPHER STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-12-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Kenneth Clark Acad. (frmly New Acadq:
02-0053   New Construction             0-005-001  05/01/03  NO CHANGE ORDERS ON ELECTRONIC FILE

ABBOTT UFSD (DISTRICT CLOSED) STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-13-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXAbbott High School (DistrictClosed:
94-0983   Reconstruction               0-001-001  02/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0722   Reconstruction               0-001-002  07/23/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              38,640                  01/30/02   03/18/02    Noresco                             
 

          XXAbbott Middle School-districtClosd:
03-0082   Reconstruction               0-002-001  08/13/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           4,850                  11/14/03   11/25/03    Cali Brothers                       
                                                            H-01           15,800                  10/14/03   10/20/03    TES Const.                          
 

HARRISON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-05-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Purchase St. Elementary:
95-1159   Reconstruction               0-001-010  05/22/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0196   Additions and Alterations    0-001-011  10/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1654   Reconstruction               0-001-012  06/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1941   Reconstruction               0-001-015  08/08/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1642   Reconstruction               0-001-017  05/29/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -13,250                  08/20/10   09/23/10    SIGNING STAR                        
 
10-1065   Reconstruction               0-001-019  05/24/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1347   Reconstruction               0-001-020  06/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1244   Reconstruction               0-001-021  10/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1027   Reconstruction               0-001-022  04/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2014   Reconstruction               0-001-025  07/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Klein Middle School:
95-1081   Reconstruction               0-003-010  04/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1256   Reconstruction               0-003-011  05/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1191   Reconstruction               0-003-012  04/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1160   Reconstruction               0-003-013  05/22/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1015   Reconstruction               0-003-015  04/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1574   Reconstruction               0-003-016  08/06/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0107   Reconstruction               0-003-017  09/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1663   Reconstruction               0-003-018  04/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0601   Reconstruction               0-003-019  12/29/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1664   Reconstruction               0-003-021  05/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1672   Reconstruction               0-003-024  07/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1363   Reconstruction               0-003-025  06/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1415   Reconstruction               0-003-026  05/21/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1643   Reconstruction               0-003-027  05/29/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1434   Reconstruction               0-003-028  05/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1322   Reconstruction               0-003-029  06/02/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1348   Reconstruction               0-003-030  06/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1471   Reconstruction               0-003-031  05/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0888   Reconstruction               0-003-033  05/19/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1245   Reconstruction               0-003-035  10/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1261SR Reconstruction               0-003-036  04/03/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO-04        9,601                  07/18/18   07/31/18    DEROSA SPORTS CONSTRUCTION          
                                                            GC-CO-05       10,000                  07/23/18   08/01/18    DEROSA SPORTS CONSTRUCTION          
                                                            GCCO03          3,926                  06/27/18   08/01/18    DEROSA SPORTS CONSTRUCTION INC      
 
18-0395   Reconstruction               0-003-036  11/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO-01       39,182                  05/07/18   02/27/19    DEROSA SPORTS CONSTRUCTION,INC.     
                                                            GC-CO-02       20,003                  05/07/18   02/27/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            GC-CO-06       55,000                  01/04/19   02/12/19    DEROSA SPORTS CONSTRUCTION, INC.    
                                                            MC-02         -25,000                  12/10/20   02/24/21    A DIVISION OF DYNAMIC SYSTEMS, INC. 
                                                            MC-CO-01       41,257                  09/16/19   09/18/19    A DIVISION OF DYNAMIC SYSTEMS, INC. 
                                                            PC-CO-01       -6,288                  02/27/20   06/29/20    JOE LOMBARDO PLUMBING, HEATING AND  
 
16-1262   Reconstruction               0-003-037  09/28/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-CO-02      -11,320                  12/17/21   01/10/23    TALT ELECTRIC                       
                                                            ECCO-01        38,558                  02/19/19   02/28/19    TALT ELECTRIC                       
                                                            GC2-CO01       67,033                  05/28/19   07/02/19    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC2-CO02        5,946                  09/23/19   12/12/19    KEY CONSTRUCTION SERVICES INC.      
                                                            GC2-CO03        2,344                  01/08/20   02/13/20    KEY CONSTRUCTION SERVICES, LLC      
                                                            MC-CO-02          526                  05/28/19   05/29/19    HI-TECH AIR CONDITIONING            
                                                            MC-CO-03        1,886                  01/08/20   01/29/20    HI-TECH AIR CONDITIONING            
                                                            MC-CO-04        3,336                  01/08/20   01/29/20    HI-TECH AIR CONDITIONING            
                                                            MCCO-01        26,325                  02/19/19   02/28/19    HI-TECH AIR CONDITIONING            
 
16-1263   Additions and Alterations    0-003-038  07/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0096   Reconstruction               0-003-039  09/18/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-16         -14,074                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-17          41,243                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-18          49,987                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-19          -3,282                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-20          12,119                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-21          14,311                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-22           9,892                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-23          30,000                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-24         -10,534                  11/06/20   03/08/21    NIRAM, INC.                         
                                                            GC-25           1,302                  12/10/20   03/10/21    NIRAM, INC.                         
                                                            GC-CO-01      147,084                  01/08/20   02/28/20    NIRAM, INC.                         
                                                            GC-CO-02       -8,500                  01/08/20   03/20/20    NIRAM, INC.                         
                                                            GC-CO-03       34,129                  02/27/20   06/11/20    NIRAM, INC.                         
                                                            GC-CO-04        4,423                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-05        4,038                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-06       10,397                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-07       14,131                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-08   -1,195,262                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-09       50,988                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-10        7,862                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-11       11,667                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-12        2,482                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-13      242,467                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-14            0                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GC-CO-15       17,488                  07/17/20   09/18/20    NIRAM, INC.                         
                                                            GCR-01        -11,090                  12/10/20   03/10/21    ARMOR-TITE CONSTRUCTION CORP.       
 
21-1379FA Reconstruction               0-003-040  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2026FP Reconstruction               0-003-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Harrison Ave. School:
95-1082   Reconstruction               0-004-009  04/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1257   Reconstruction               0-004-010  05/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1190   Reconstruction               0-004-011  04/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1161   Reconstruction               0-004-012  05/22/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1016   Reconstruction               0-004-013  04/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0050   Reconstruction               0-004-016  11/03/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1319   Reconstruction               0-004-017  06/20/06  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1349   Reconstruction               0-004-020  06/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0731   Reconstruction               0-004-021  02/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0889   Reconstruction               0-004-023  05/19/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2-1          -35,000                  05/22/17   06/01/17    More Consulting Corp.               
                                                            G2-2           -1,500                  10/26/17   11/13/17    More Consulting Corp.               
 
16-1246   Reconstruction               0-004-025  10/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1846   Additions and Alterations    0-004-026  02/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01         -53,000                  06/16/21   03/15/22    Dobtol Construction LLC             
                                                            GCR-01         10,582                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-02         -3,621                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-03         12,527                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-04          2,873                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-05          1,718                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-06          1,980                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-07         15,053                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-08       -120,000                  11/06/20   03/08/21    BONDEX INSURANCE GROUP              
                                                            GCR-09         15,974                  11/06/20   03/08/21    BONDEX INSURANCE FROUP              
                                                            MC-CO-01         -866                  01/08/20   01/29/20    HI-TECH AIR CONDITIONING            
                                                            PC-CO-01      -11,274                  04/15/19   04/16/19    GROTTO PLUMBING, INC.               
 
16-1556   Reconstruction               0-004-027  05/10/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1737   Additions and Alterations    0-004-028  07/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0986FC Reconstruction               0-004-029  01/12/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H1           -106,890                  12/15/22   11/27/23    Commerical instrument Servs         
 
22-2015   Reconstruction               0-004-030  07/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2027FP Reconstruction               0-004-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Parsons Memorial Elementary:
95-1083   Reconstruction               0-006-013  04/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1162   Reconstruction               0-006-014  05/22/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1017   Reconstruction               0-006-015  04/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1655   Reconstruction               0-006-017  06/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0110   Reconstruction               0-006-020  08/03/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0539   Reconstruction               0-006-021  01/10/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,770                  10/27/03   11/12/03    Popoli Const.                       
                                                            002            14,610                  10/27/03   11/12/03    Popoli Const.                       
                                                            1              87,000                  10/27/03   11/12/03    Laser Industries                    
 
08-1416   Reconstruction               0-006-023  05/21/09  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1350   Reconstruction               0-006-025  06/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1472   Reconstruction               0-006-026  05/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1308   Reconstruction               0-006-027  05/06/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1247   Reconstruction               0-006-029  10/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2135   Additions and Alterations    0-006-030  07/10/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-12             980                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-13           4,315                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-14           2,109                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-15           2,351                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-16          -3,500                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-17           9,905                  01/28/21   04/09/21    JENNINGS CO., INC.                  
                                                            GC-18          -8,300                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-19          32,500                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-20         -52,384                  12/10/20   03/10/21    JENNINGS CO.,INC.                   
                                                            GC-CO-01       -8,000                  05/10/19   10/04/19    JENNINGS CO.,INC.                   
                                                            GC-CO-02       26,603                  06/20/19   10/03/19    JENNINGS CO.,INC.                   
                                                            GC-CO-03       30,243                  09/30/19   12/31/19    JENNINGS CO.,INC.                   
                                                            GC-CO-04       20,795                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            GC-CO-05        1,095                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            GC-CO-06       -6,000                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            GC-CO-07        7,531                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            GC-CO-08        4,834                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            GC-CO-09        3,213                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            GC-CO-10       -4,890                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            GC-CO-11        6,393                  01/08/20   02/18/20    JENNINGS CO.,INC.                   
                                                            MC-AD-01            0                  01/08/20     /  /      HI-TECH AIR CONDITIONING            
                                                            MC-AD-02            0                  01/08/20     /  /      HI-TECH AIR CONDITIONING            
                                                            MC-CO-01      -20,407                  01/08/20   01/29/20    HI-TECH AIR CONDITIONING            
                                                            PC-02          25,000                  12/10/20   02/24/21    S&L PLUMBING AND HEATING            
                                                            PC-AD-01            0                  01/08/20     /  /      S&L PLUMBING AND HEATING            
                                                            PC-AD-02            0                  01/08/20     /  /      S&L PLUMBING AND HEATING            
                                                            PC-CO-01       -2,859                  05/28/19   05/30/19    S&L PLUMBING AND HEATING            
                                                            PC-CO-03        3,846                  01/08/20   01/29/20    S&L PLUMBING AND HEATING            
                                                            PC-CO-04        2,587                  01/08/20   01/29/20    S&L PLUMBING AND HEATING            
                                                            PC-CO-05       -1,727                  01/08/20   01/29/20    S&L PLUMBING AND HEATING            
 
17-1028   Reconstruction               0-006-031  04/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2082FB Reconstruction               0-006-033  06/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0927   Reconstruction               0-006-034  06/14/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1741   Reconstruction               0-006-035  06/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Preston School:
93-0216   Reconstruction               0-007-009  09/21/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1084   Reconstruction               0-007-010  04/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1163   Reconstruction               0-007-011  05/22/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0197   Additions and Alterations    0-007-012  09/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1656   Reconstruction               0-007-014  06/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1435   Reconstruction               0-007-018  05/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002        -25,000                  08/20/10     /  /      SIGNING STAR                        
 
11-1351   Reconstruction               0-007-019  06/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1473   Reconstruction               0-007-020  05/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1248   Reconstruction               0-007-021  10/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1629   Reconstruction               0-007-022  07/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            188,749                  08/23/21   05/24/22    ARROW STEEL WINDOW CORP             
                                                            G-002          61,846                  08/23/21   05/24/22    BOROUGH CONSTRUCTION GROUP, LLC     
 
17-1029   Reconstruction               0-007-023  04/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1286   Reconstruction               0-007-024  05/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01         -19,000                  04/08/19   04/12/19    J&M HEATING & AIR CONDITIONING,INC. 
 
17-1285   Reconstruction               0-007-025  05/31/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Harrison  High School:
95-1085   Reconstruction               0-011-006  04/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0976   Reconstruction               0-011-007  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1394   Additions and Alterations    0-011-008  05/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0840   Reconstruction               0-011-012  12/18/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,000                  01/13/04   03/09/04    Peter Landi                         
                                                            2              19,500          12,500  06/17/04   06/22/04    Peter Landi                         
 
06-0461   Reconstruction               0-011-013  12/17/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1537   Reconstruction               0-011-014  06/11/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           4,800                  12/03/07   12/12/07    DSA Services                        
 
07-0084   Reconstruction               0-011-015  08/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          30,000                  06/02/08   08/27/08    Xavier Contracting                  
                                                            00001          15,640                  08/18/08   11/18/08    JANSON INDUSTERIES, LTD.            
                                                            00001           7,633                  12/21/09   01/07/11    TALT ELECTRIC                       
                                                            00002          -2,720                  12/21/09   01/07/11    JANSON INDUSTRIES                   
 
08-0085   Alterations                  0-011-016  09/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1436   Reconstruction               0-011-017  05/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1644   Reconstruction               0-011-018  05/29/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1432   Reconstruction               0-011-019  05/24/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0920   Reconstruction               0-011-020  06/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1323   Reconstruction               0-011-021  06/02/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1316   Reconstruction               0-011-022  08/17/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1315   Reconstruction               0-011-023  08/21/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -15,000                  04/21/14   05/02/14    Arrow Steel Window Corp.            
 
11-1352   Reconstruction               0-011-024  06/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0870   Reconstruction               0-011-025  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0699   Reconstruction               0-011-026  05/23/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -61,408                  04/21/14   05/02/14    Piazza Inc.                         
                                                            G2            -24,730                  04/21/14   05/02/14    Piazza Inc.                         
 
12-1073   Reconstruction               0-011-028  04/16/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             -5,000                  04/21/14   05/02/14    Arrow Steel Window Corp.            
 
13-0808   Reconstruction               0-011-029  06/13/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1474   Reconstruction               0-011-030  05/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0576   Additions and Alterations    0-011-031  08/25/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1562   Reconstruction               0-011-033  08/19/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -21,354                  06/06/17   06/14/17    Con-Tech Construction Tech., Inc.   
 
14-1309   Reconstruction               0-011-034  05/06/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0995   Additions and Alterations    0-011-035  08/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -40,860                  11/01/17   11/16/17    Peter A. Camilli & Sons, Inc.       
                                                            G2             -7,500                  02/27/20   07/06/20    PETER A. CAMILLI & SON, INC.        
 
15-0890   Reconstruction               0-011-036  05/19/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1-1          -35,000                  07/06/17   07/17/17    More Consulting Corp.               
                                                            G1-2           -9,925                  05/22/17   06/01/17    More Consulting Corp.               
 
16-1249   Reconstruction               0-011-037  10/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0759   Reconstruction               0-011-038  05/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1           -125,828                  11/01/17   11/16/17    More Roofing Inc                    
 
16-1264   Reconstruction               0-011-039  05/19/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1823   Additions and Alterations    0-011-040  01/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-CO-01      -10,825                  10/22/18   11/07/18    All Bright Electric                 
                                                            EC-CO-02      -13,381                  10/15/19   10/18/19    ALL BRIGHT ELECTRIC                 
                                                            GC-02         -63,000                  12/10/20   03/10/21    DOBTOL CONSTRUCTION, LLC            
                                                            GC-CO-03      -85,006                  10/22/18   11/28/18    Dobtol Construction LLC             
                                                            GC-CO-04        9,526                  01/11/19   02/11/19    DOBTOL CONSTRUCTION LLC             
                                                            GCCO01        123,942                  08/29/18   11/06/18    DOBTOL CONSTRUCTION                 
                                                            GCCO05         -3,080                  02/11/19   03/15/19    DOBTOL CONSTRUCTION LLC             
                                                            GCR-01        -35,114                  02/27/20   07/06/20    BONDEX ONSURANCE GROUP              
                                                            GCR-02        -77,000                  02/27/20   07/06/20    BONDEX INSURANCE GROUP              
                                                            MC-CO-01      -19,071                  02/27/20   06/29/20    CLEAN AIR QUALITY SERVICE, INC.     
                                                            PC-CO-01       -7,500                  01/28/19   02/25/19    SOUTHEAST PLUMBING                  
 
16-1416   Reconstruction               0-011-041  06/20/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -17,260                  03/09/18   03/13/18    Pat Corsetti, Inc.                  
 
16-1079   Reconstruction               0-011-042  02/06/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             -5,000                  07/17/17   09/07/17    Academy Construction, Inc.          
 
17-1030   Reconstruction               0-011-043  04/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0279   Additions and Alterations    0-011-044  03/09/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,410                  11/06/20   03/08/21    JENNINGS CO.,INC.                   
                                                            GC-02          17,800                  11/06/20   03/08/21    JENNINGS CO.,INC.                   
                                                            GC-03          -7,500                  11/06/20   03/08/21    JENNINGS CO.,INC.                   
                                                            GC-04           1,711                  11/06/20   03/08/21    JENNINGS CO.,INC.                   
                                                            GC-05          -8,537                  11/06/20   03/08/21    JENNINGS CO.,INC.                   
 
21-0836FC Reconstruction               0-011-045  01/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0928FC Reconstruction               0-011-046  02/02/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H1           -210,557                  12/15/22     /  /      Commercial Instrumt Servs           
 
02-2025FP Reconstruction               0-011-FP1  06/10/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular #1 @ Purchase:
99-0019   New Construction             0-018-001  10/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          MODULAR @ KLEIN MS:
00-0705   New Construction             0-023-001  02/16/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Purchase Portables II:
02-0020   New Construction             0-024-001  08/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Bldg @ Klein MS:
05-1320   New Construction             2-027-001  06/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              45,000                  03/18/08   04/21/08    Steve Giordano Builders Incorp.     
 

          Guard Booth #1:
03-0844   New Construction             7-025-001  12/22/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Guard Booth #2:
03-0845   New Construction             7-026-001  12/22/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box w/Grandstand @ HS:
06-0606   New Construction             7-029-001  09/22/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              7,072                  03/15/10   05/28/10    DEROSA TENNIS CONTRACTORS INC.      
 

          Comfort Station @ Purchase Elem.:
19-1313   New Construction             7-030-001  05/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
95-1554   Reconstruction               7-999-001  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Leased Portables at Purchase Elem:
93-0274   New Construction             8-014-001  11/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE

MAMARONECK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-07-01-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Mamaroneck High School:
90-1150   Alterations                  0-001-009  05/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1063   Reconstruction               0-001-011  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1245   Reconstruction               0-001-012  06/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0057   Reconstruction               0-001-013  08/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1288   Reconstruction               0-001-014  03/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -4,895                  02/04/02   03/06/02    Infinity Environmental              
 
02-0283   Additions and Alterations    0-001-015  06/19/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            01             17,000                  03/17/04   06/18/04    Filingeri Elec.                     
                                                            01             12,727                  09/14/04   09/29/04    MA Angeliades                       
                                                            01              2,000                  09/14/04   09/29/04    NSC Abatement Service               
                                                            01              8,500                  12/13/04   06/23/05    Mengler mechanical                  
                                                            01            -67,995                  03/10/05   01/04/06    Ace Communications                  
                                                            02             42,836                  09/14/04   09/14/04    Filingeri Elec.                     
                                                            02              6,571                  09/13/04   10/04/04    MA Angeliades                       
                                                            02              6,000                  10/04/04   10/18/04    NSC Abatement Service               
                                                            02             17,600                  12/17/04   06/23/05    Mengler Mechanical                  
                                                            02              3,904                  03/10/05   01/03/06    Ace Construction                    
                                                            03              7,426                  09/13/04   10/14/04    Filingeri Elec.                     
                                                            03             28,000                  12/17/04   06/23/05    Mengler Mechanical                  
                                                            03             19,500                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            03              5,600                  05/19/05   06/07/05    NSC Abatement Services              
                                                            04             15,300                  10/20/04   06/21/05    Filingeri Elec.                     
                                                            04             25,000                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            05              4,000                  12/17/04   06/23/05    Filingeri Electrical Contracting    
                                                            05             10,000                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            06             12,500                  12/17/04   06/23/05    Filingeri Electrical Contracting    
                                                            06             10,000                  03/10/05   03/17/05    MA Angeliades Inc                   
                                                            07              6,670                  12/17/04   06/23/05    Filingeri Electrical Contracting    
                                                            07              2,500                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            08              5,900                  03/10/05   03/17/05    MA Angeliades Inc                   
                                                            08                600                  05/19/05   06/07/05    Filingeri Electrical Contracting    
                                                            09             26,280                  03/10/05   03/31/05    MA Angeliades inc                   
                                                            09              1,400                  05/19/05   06/07/05    Filingeri Electrical Contracting    
                                                            1               3,186                  12/27/05   04/24/06    C and B Plumbing Heating            
                                                            10              4,500                  03/10/05   03/31/05    MA Angeliades inc                   
                                                            10              4,500                  05/19/05   06/07/05    Filingeri Electrical Contracting    
                                                            11              4,000                  03/10/05   03/25/05    MA Angeliades Inc                   
                                                            11              4,700                  05/19/05   06/10/05    Filingeri Electrical Contracting    
                                                            12             30,000                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            12              2,151                  11/08/05   12/08/05    Filingeri electrical Contracting    
                                                            13              4,870                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            13              5,336                  11/08/05   12/08/05    filingeri Electrical contracting    
                                                            14             19,000                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            14              6,327                  11/08/05   11/08/05    filingeri Electrical Contracting    
                                                            15              1,700                  03/10/05   03/31/05    MA Angeliades Inc                   
                                                            15              1,000                  11/08/05   11/08/05    Filingeri electrical Contracting    
                                                            16             19,816                  09/23/05   09/30/05    MA Angeliades Inc                   
                                                            16              4,000                  06/19/06   06/19/06    Filingeri Electrical                
                                                            17              5,010                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            17              3,020                  06/19/06   06/21/05    Filingeri Electrical                
                                                            17             59,740                  01/08/07   02/21/07    GREYHAWK North America              
                                                            18              2,988                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            19             18,250                  09/23/05   10/03/05    MA Angliades Inc                    
                                                            20              4,500                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            21              4,400                  09/23/05   10/03/05    MA Angeliades Inc                   
                                                            22             13,500                  09/23/05   10/03/05    MA Angeliades Inc                   
                                                            23             15,950                  09/23/05   10/03/05    MA Angeliades Inc                   
                                                            24              3,600                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            25              8,800                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            26             15,500                  09/23/05   10/03/05    MA Angeliades Inc                   
                                                            27            -28,660                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            28              6,000                  09/23/05   09/28/05    MA Angeliades inc                   
                                                            29              4,000                  09/23/05   10/03/05    MA Angeliades inc                   
                                                            3               4,800                  09/23/05   10/05/05    ACE Communication                   
                                                            30             10,000                  09/23/05   10/03/05    MA Angeliades Inc                   
                                                            31              2,000                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            32              5,500                  09/23/05   10/03/05    MA Angeliades inc                   
                                                            33             -5,366                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            34             -7,925                  09/23/05   09/28/05    MA Angeliades Inc                   
                                                            35             10,368                  05/02/06   08/09/06    Ma Angeliades inc                   
                                                            36             27,441                  05/02/06   06/23/06    Ma Angeliades inc                   
                                                            37             59,740                  01/08/07   02/21/07    MA Angeliades Inc                   
                                                            38             11,570                  01/08/07   02/21/07    MA Angeliades Inc                   
                                                            39              3,252                  01/08/07   02/21/07    MA Angeliades Inc                   
                                                            4               2,622                  01/08/07   02/22/07    Mengler Mechanical                  
                                                            40             29,966                  04/02/07   05/16/07    MA Angeliades                       
                                                            41              5,491                  04/02/07   05/16/07    MA Angeliades Inc                   
                                                            42             11,392                  04/02/07   05/16/07    MA Angeliades                       
                                                            5               4,987                  01/08/07   02/22/07    Mengler Mechanical                  
                                                            6               2,300                  01/08/07   02/22/07    Mengler Mechanical                  
                                                            7               2,530                  01/08/07   02/22/07    Mengler Mechanical                  
                                                            8               2,369                  01/08/07   02/22/07    Mengler Mechanical                  
                                                            9              33,000                  04/24/07     /  /      Mengler Mechanical                  
 
96-0562   Additions and Alterations    0-001-016  12/20/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-14               0                  10/20/03   10/27/03    The Hartford Fire Ins. Co.          
                                                            GC-16               0                  10/20/03   10/27/03    The Hartford Fire Ins. Co.          
                                                            P-1                 0                  05/21/03   05/27/03    Frank & Lindy Plumbing              
 
96-1096   Reconstruction               0-001-017  05/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1550   Reconstruction               0-001-018  06/26/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,103                  11/19/01   01/08/02    Parkview Contracting                
 
98-0417   Reconstruction               0-001-019  01/19/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,000                  05/03/02   05/03/02    Mengler Contracting                 
                                                            2              71,173                  05/03/02   01/14/03    Mengler Contracting                 
 
04-1109   Reconstruction               0-001-020  05/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            134,550                  09/23/05   10/04/05    LPD Contracting                     
                                                            02             12,500                  09/23/05   10/04/05    LPD Contracting                     
 
00-0735   Reconstruction               0-001-022  07/10/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           6,596                  03/25/02   05/10/02    Keyspan Energy Solutions            
                                                            00001          12,688                  03/25/02   05/14/02    B&H Const.                          
                                                            00001          18,765                  05/09/02   06/04/02    C&B Plumbing                        
                                                            00001           9,113                  11/07/02   12/23/02    Talt Elec.                          
                                                            00001           3,180                  05/21/03   06/03/03    H&E Equipment                       
                                                            000012           -763                  05/02/05     /  /      Keyspan Energy Solutions            
                                                            00002           2,207                  05/09/02   06/04/02    B&H Const.                          
                                                            00002          10,627                  05/09/02   06/04/02    C&B Plumbing                        
                                                            00002           3,019                  06/17/02   07/10/02    Talt Elec.                          
                                                            00002           5,064                  08/14/02   08/16/02    Keyspan Energy                      
                                                            00002           6,400                  05/21/03   06/03/03    H&E Equipment                       
                                                            00003             706                  05/09/02   06/04/02    B&H Const.                          
                                                            00003           9,528                  05/09/02   06/04/02    C&B Plumbing                        
                                                            00003           8,897                  06/17/02   07/10/02    Talt Elec.                          
                                                            00003           4,053                  08/14/02   08/16/02    Keyspan Energy                      
                                                            00003            -322                  07/17/03   07/24/03    H&E Equipment                       
                                                            00004           2,079                  05/09/02   06/04/02    B&H Const.                          
                                                            00004           2,992                  06/17/02   07/10/02    Talt Elec.                          
                                                            00004           3,708                  06/17/02   07/10/02    C&B Plumbing                        
                                                            00004           3,693                  08/14/02   08/16/02    Keyspan Energy                      
                                                            00004          -2,018                  09/14/04   10/25/04    H&E Equip.                          
                                                            00005          -1,010                  05/09/02   06/04/02    B&H Const.                          
                                                            00005          -7,019                  06/17/02   07/10/02    Talt Elec.                          
                                                            00005          12,000                  06/17/02   07/10/02    C&B Plumbing                        
                                                            00005           3,577                  08/14/02   08/16/02    Keyspan Energy                      
                                                            00005          -8,450                  09/14/04   10/25/04    H&E Equip.                          
                                                            00006           3,425                  06/17/02   07/10/02    Talt Elec.                          
                                                            00006           5,650                  06/17/02   07/10/02    C&B Plumbing                        
                                                            00006          12,955                  07/12/02   07/24/02    B&H Const.                          
                                                            00006           2,872                  11/07/02   12/23/02    Keyspan Energy                      
                                                            00007           3,850                  06/17/02   07/10/02    C&B Plumbing                        
                                                            00007           7,039                  07/12/02   07/24/02    B&H Const.                          
                                                            00007          -9,420                  11/07/02   12/23/02    Talt Elec.                          
                                                            00007          -6,370                  09/14/04   10/25/04    Keyspan Energy Solutions            
                                                            00008           8,542                  07/12/02   07/24/02    B&H Const.                          
                                                            00008          16,857                  09/25/02   10/30/02    C&B Plumbing                        
                                                            00008             808                  11/07/02   12/23/02    Talt Elec.                          
                                                            00008          -2,500                  09/14/04   10/25/04    Keyspan Energy Solutions            
                                                            00009           2,517                  07/12/02   07/24/02    B&H Const.                          
                                                            00009           1,177                  10/15/02   12/02/02    C&B Plumbing                        
                                                            00009             871                  11/07/02   12/23/02    Talt Elec.                          
                                                            00009          -3,364                  09/14/04   10/25/04    Keyspan Energy Solutions            
                                                            00010          17,500                  07/12/02   07/24/02    B&H Const.                          
                                                            00010           1,520                  10/15/02   12/02/02    C&B Plumbing                        
                                                            00010             462                  11/07/02   12/23/02    Talt Elec.                          
                                                            00010           1,166                  05/02/05   06/10/05    Keyspan Energy Solutions            
                                                            00011           3,392                  07/12/02   07/24/02    B&H Const.                          
                                                            00011           2,327                  11/07/02   12/23/02    Talt Elec.                          
                                                            00011          -1,250                  05/15/03   06/02/03    C&B Plumbing                        
                                                            00011         -21,400                  09/14/04   10/25/04    Keyspan Energy Solutions            
                                                            00012             824                  07/12/02   07/24/02    B&H Const.                          
                                                            00012          -1,850                  11/07/02   12/23/02    Talt Elec.                          
                                                            00012            -763                  05/27/05   07/22/05    Keyspan Energy Solutions,Inc.       
                                                            00013          13,873                  08/14/02   08/16/02    B&H Const.                          
                                                            00013           5,674                  01/21/03   02/05/03    Talt Elec.                          
                                                            00013           8,250                  05/02/05   06/21/05    Keyspan energy Solutions            
                                                            00014           4,146                  08/14/02   08/16/02    B&H Const.                          
                                                            00015           5,374                  08/14/02   08/16/02    B&H Const.                          
                                                            00015           4,858                  01/21/03   01/23/03    Talt Elec.                          
                                                            00016           3,800                  08/14/02   08/16/02    B&H Const.                          
                                                            00016           2,533                  01/21/03   01/23/03    Talt Elec.                          
                                                            00017             782                  08/14/02   08/16/02    B&H Const.                          
                                                            00017             832                  01/21/03   01/23/03    Talt Elec.                          
                                                            00018          25,833                  11/07/02   12/23/02    B&H Const.                          
                                                            00018             605                  01/21/03   01/23/03    Talt Elec.                          
                                                            00019           1,897                  01/21/03   01/23/03    Talt Elec.                          
                                                            00019          -3,180                  01/21/03   02/06/03    B&H Const.                          
                                                            00020           8,750                  12/09/02   01/07/03    B&H Const.                          
                                                            00020           2,798                  05/15/03   06/03/03    Talt Elec.                          
                                                            00021           4,131                  12/09/02   01/07/03    B&H Const.                          
                                                            00021          -2,310                  07/17/03   07/24/03    Talt Elec.                          
                                                            00022           7,355                  12/09/02   01/07/03    B&H Const.                          
                                                            00023           5,840                  12/09/02   03/28/03    B&H Const.                          
                                                            00024          -3,800                  12/09/02   01/07/03    B&H Const.                          
                                                            00025           1,465                  12/09/02   01/07/03    B&H Const.                          
                                                            00026           2,400                  12/09/02   01/07/03    B&H Const.                          
                                                            00027           1,900                  12/09/02   01/07/03    B&H Const.                          
                                                            00028           3,047                  12/09/02   01/07/03    B&H Const.                          
                                                            00029         -34,664                  12/09/02   01/07/03    B&H Const.                          
                                                            00030          -2,357                  12/09/02   01/07/03    B&H Const.                          
                                                            00031           2,640                  01/21/03   02/05/03    B&H Const.                          
                                                            00032           1,420                  01/21/03   02/05/03    B&H Const.                          
                                                            00033          -4,500                  01/21/03   02/05/03    B&H Const.                          
                                                            00034         -11,466                  09/14/04   10/25/04    B&H Const.                          
                                                            00035          -1,250                  09/14/04   10/25/04    B&H Const.                          
                                                            00036          -6,055                  09/14/04   10/25/04    B&H Const.                          
                                                            00037         -10,870                  05/15/03   06/03/03    B&H Const.                          
                                                            00038           5,743                  05/15/03   06/03/03    B&H Const.                          
                                                            00039          -2,415                  09/14/04   10/25/04    B&H Const.                          
                                                            00040          34,446          34,446  05/15/03   06/03/03    B&H Const.                          
                                                            00041        -193,067                  09/14/04   02/09/05    B&H Const.                          
                                                            011             8,300                  05/15/03   07/23/03    Derosa Tennis                       
                                                            012             2,800                  07/17/03   07/24/03    Derosa Tennis                       
                                                            013             1,000                  07/17/03   07/24/03    Derosa Tennis                       
                                                            014             1,000                  07/17/03   07/24/03    Derosa Tennis                       
                                                            1              30,000          30,000  10/15/02   12/02/02    Derosa Tennis                       
                                                            10              9,000                  12/09/02   01/07/03    Derosa Tennis                       
                                                            2               5,000                  10/15/02   10/12/04    Derosa Tennis                       
                                                            3              27,000          27,000  10/15/02   12/02/02    Derosa Tennis                       
                                                            4               3,500                  11/07/02   12/23/02    Derosa Tennis                       
                                                            5               3,000                  11/07/02   12/23/02    Derosa Tennis                       
                                                            6                 750                  11/07/02   12/23/02    Derosa Tennis                       
                                                            7               6,000                  11/07/02   12/23/02    Derosa Tennis                       
                                                            8              18,400          18,400  11/07/02   12/23/02    Derosa Tennis                       
                                                            9               1,500                  11/07/02   12/23/02    Derosa Tennis                       
 
01-0840   Reconstruction               0-001-023  02/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,603                  09/19/02   09/23/02    Melwood Contracting                 
                                                            1               3,720                  09/19/02   09/23/02    Talt Elec.                          
                                                            1               7,225                  09/19/02   09/23/02    C&B Plumbing                        
                                                            1               6,222                  10/15/02   10/23/02    Meyler Contracting                  
                                                            1              -1,500                  07/17/03   07/22/03    DJ Contracting                      
                                                            2               1,154                  09/19/02   09/23/02    Melwood Contracting                 
                                                            2                 616                  09/19/02   09/23/02    Talt Elec.                          
                                                            2               5,913                  09/19/02   09/23/02    C&B Plumbing                        
                                                            2               6,020                  10/15/02   10/23/02    Meyler Contracting                  
                                                            3               3,550                  09/19/02   09/23/02    Melwood Contracting                 
                                                            3               2,629                  09/19/02   09/23/02    Talt Elec.                          
                                                            3                 708                  09/19/02   09/23/02    C&B Plumbing                        
                                                            3              11,502                  10/15/02   10/23/02    Meyler Contracting                  
                                                            4               3,617                  09/19/02   09/23/02    Melwood Contracting                 
                                                            4               1,418                  09/19/02   09/23/02    C&B Plumbing                        
                                                            4               1,633                  09/19/02   09/23/02    Faulk Elec.                         
                                                            4               4,864                  10/15/02   10/23/02    Meyler Contracting                  
                                                            5              13,738                  09/19/02   09/23/02    Melwood Contracting                 
                                                            5               1,259                  09/19/02   09/23/02    Talt Elec.                          
                                                            5              -1,300                  12/04/02   12/10/02    Mengler Contracting                 
                                                            5               1,660                  09/16/03   09/19/03    C&B Plumbing                        
                                                            6               6,917                  10/15/02   10/23/02    Melwood Contracting                 
                                                            6               8,050                  03/27/03   03/31/03    Talt Elec.                          
                                                            7                 308                  03/27/03   03/31/03    Talt Elec.                          
 
04-1263   Reconstruction               0-001-024  06/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003         -12,711                  09/16/05   09/21/05    delete Toli Tile                    
                                                            00006          13,800                  09/16/05   07/09/19    Greyhawk North America              
                                                            03             17,953                  09/23/05   10/03/05    Executech Construction              
                                                            04              6,300                  09/23/05   10/03/05    Executech Construction              
                                                            05              5,500                  09/23/05   10/03/05    Exectutech Construction             
                                                            1               4,735                  03/21/06     /  /      Mengler Mechanical                  
                                                            1               8,500                  05/15/06   07/24/06    Innovative Electric                 
                                                            2              11,700                  03/21/06   05/24/06    Mengler Mechanical                  
                                                            2               6,000                  05/15/06   07/24/06    innovative Electric                 
                                                            3               7,135                  03/21/06   05/24/06    Mengler Mechanical                  
 
04-1327   Reconstruction               0-001-025  09/29/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -25,000                  06/19/07   07/17/07    NSC Abatement Services              
                                                            1 EC           38,224                  02/13/08   03/31/08    talt electric                       
                                                            1 HVAC         21,229                  04/08/08   08/04/08    DUNCAN INDUSTRIES CORP.             
                                                            1 PLUMB         2,253                  03/17/08   08/07/08    MENGLER MECHANICAL, INC.            
                                                            1-GC           54,161                  09/26/07   01/28/08    SUBOLO CONTRACTING CORP.            
                                                            10-GC          21,998                  01/09/08   01/25/08    GENERAL CONSTRUCTION                
                                                            11-GC          10,105                  03/17/08   04/02/08    SUBOLO CONTRACTING CORP.            
                                                            12 GC           6,642                  03/17/08   04/29/08    SUBOLO CONTRACTING CORP.            
                                                            13GC           11,241                  03/17/08   08/06/08    SUBOLO CONTRACTING CORP.            
                                                            14 GC          15,339                  05/05/08     /  /      SUBOLO CONTRACTING CORP.            
                                                            15 GC          10,829                  05/05/08   06/12/08    SUBOLO CONTRACTING CORP.            
                                                            16 GC           2,541                  05/05/08   06/12/08    SUBOLO CONTRACTING CORP.            
                                                            17 GC           1,155                  05/05/08   06/12/08    SUBOLO CONTRACTING CORP.            
                                                            18-GC           3,445                  08/01/08   10/07/08    SUBOLO CONTRACTING CORP.            
                                                            1AdminHV        7,921                  11/05/07   01/28/08    Mengler Mechanical                  
                                                            1Telecom        4,400                  11/05/07   01/28/08    CBS Technologies                    
                                                            2 - ASB        28,602                  09/26/07   12/27/07    NSB ABATEMENT SERVICES INC.         
                                                            2 - GC         14,125                  09/26/07   12/27/07    SUBOLO CONTRACTING CORP.            
                                                            2 HVAC          7,750                  04/08/08   08/04/08    DUNCAN INDUSTRIES CORP.             
                                                            2 PLUMB         2,826                  03/17/08   08/07/08    MENGLER MECHANCIAL, INC.            
                                                            27             -5,635                  04/10/08     /  /      TALT ELECTRIC                       
                                                            28             30,572                  04/10/08     /  /      TALT ELECTRIC                       
                                                            2EC             1,428                  03/17/08   08/07/08    TALT ELECTRIC                       
                                                            2Telecom        4,550                  11/05/07   01/28/08    CBS Technologies                    
                                                            3 - GC          9,775                  09/26/07   12/27/07    SUBOLO CONTRACTING CORP.            
                                                            3 ASB           2,400                  11/05/07   01/28/08    NSC Abatement Services              
                                                            3 EC            2,444                  03/17/08   08/07/08    TALT ELECTRIC                       
                                                            3 HVAC          1,758                  04/08/08   08/04/08    DUNCAN INDUSTRIES CORP.             
                                                            4 EC              487                  03/17/08   08/07/08    TALT ELECTRIC                       
                                                            4 GC           48,048                  11/05/07   12/27/07    Subolo Contracting                  
                                                            4 HVAC          5,624                  04/08/08   08/04/08    DUNCAN INDUSTRIES CORP.             
                                                            5 EC           24,937                  04/10/08   08/04/08    TALT ELECTRIC                       
                                                            5 GC           66,420                  11/05/07   12/27/07    Subolo Contracting                  
                                                            5 HVAC          4,007                  04/08/08   08/04/08    DUNCAN INDUSTRIES CORP.             
                                                            6 GC            7,820                  11/05/07   12/27/07    Subolo Contracting                  
                                                            7-GC            9,390                  01/09/08   01/25/08    GENERAL CONSTRUCTION                
                                                            8-GC            2,370                  01/09/08   01/25/08    GENERAL CONATRUCTION                
                                                            9-GC            3,611                  01/09/08   01/25/08    GENERAL CONSTRUCTION                
 
07-1097   Reconstruction               0-001-026  01/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               6,350                  12/04/09   02/05/10    STRUCTURAL PRESERVATION SYSTEMS LLC 
 
07-0734   Reconstruction               0-001-027  01/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0728   Reconstruction               0-001-028  01/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,804                  12/09/09   04/23/09    WONDERSTAR CONSTRUCTION             
 
08-0433   Reconstruction               0-001-029  02/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0277   Reconstruction               0-001-030  11/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,450                  09/27/10   11/17/10    HYGRADE INSULATORS INC              
                                                            2              49,643                  10/15/10   10/29/10    HYGRADE INSULATORS INC              
 
09-0264   Reconstruction               0-001-031  10/28/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0628   Reconstruction               0-001-032  02/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            53,442                  02/03/11   03/10/11    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            001            47,630                  02/03/11   03/10/11    DEROSA TENNIS CONTRACTORS INC       
                                                            001               500                  02/03/11   05/04/11    DANT CLAYTON CORPORATION            
                                                            002            12,000                  02/03/11   05/04/11    DEROSA TENNIS CONTRACTORS INC       
                                                            002             1,800                  11/28/11   02/28/12    DANT CLAYTON CORPORATION            
                                                            1              47,630                  01/29/18   05/15/18    DeRosa Tennis Contractors, Inc.     
                                                            1              53,442                  01/29/18   05/15/18    Shock Electrical Contractors, Inc.  
                                                            2              12,000                  01/29/18   05/31/18    DeRosa Tennis Contractors, Inc.     
 
10-0940   Reconstruction               0-001-034  03/15/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -25,422                  01/17/13   04/15/13    HONEYWELL INTERNATIONAL INC         
 
13-0823   Reconstruction               0-001-035  04/02/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            11-01         108,000                  09/07/18   09/19/18    CONSOLIDATED HUDSON ELECTRIC        
                                                            11-02          31,379                  09/07/18   09/19/18    CONSOLIDATED HUDSON ELECTRIC        
                                                            11-03           6,375                  11/21/18   11/26/18    Consolidated hudson Electric        
                                                            13-01         186,000                  09/07/18   09/14/18    PVS CONSTRUCTION LLC                
                                                            13-02           9,000                  09/07/18   09/14/18    PVS CONSTRUCTION LLC                
                                                            13-03         305,500                  11/21/18   11/26/18    PVS Construction, LLC               
                                                            13-04          11,900                  04/24/19   04/25/19    PVS CONSTRUCTION, LLC               
 
16-0017   Reconstruction               0-001-036  02/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ELE-01         21,635                  06/06/18   06/29/18    TALT ELECTRIC                       
                                                            ELE-02         13,225                  06/06/18   06/29/18    TALT ELECTRIC                       
                                                            GC-01           8,497                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-02          27,600                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-03          33,235                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-04          24,318                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-05          29,802                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-06           8,832                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-07          19,890                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-08           7,628                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-09          83,904                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-10           7,152                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            GC-11          17,073                  06/06/18   06/29/18    CONSTRUCTION SERVICES               
                                                            MECH-001        6,240                  06/06/18   06/29/18    ABM AIR CONDITIONING & HEATING, INC.
                                                            MECH-002       41,089                  06/06/18   06/29/18    ABM AIR CONDITIONAING & HEATING, INC
                                                            MECH-03         4,846                  06/06/18   06/29/18    ABM AIR CONDITIONING & HEATING, INC.
                                                            MECH-04        19,096                  06/06/18   06/29/18    ABM AIR CONDITIONING & HEATING, INC.
                                                            MECH-05        10,335                  06/06/18   12/16/19    ABM AIR CONDITIONING & HEATING, INC.
                                                            MECH-06        24,069                  06/06/18   06/29/18    ABM AIR CONDITIONING & HEATING, INC.
                                                            PLUMB-01        4,125                  06/06/18   06/29/18    S&L PLUMBING & HEATING              
                                                            PLUMB-02       17,348                  06/06/18   06/29/18    S&L PLUMBING & HEATING              
                                                            PLUMB-03        3,664                  06/06/18   06/29/18    S&L PLUMBING & HEATING              
                                                            PLUMB-04       21,972                  06/06/18   06/29/18    S&L PLUMBING & HEATING              
                                                            PLUMB-05       18,635                  06/06/18   06/29/18    S&L PLUMBING & HEATING              
                                                            PLUMB-06       11,496                  06/06/18   06/29/18    S7L PLUMBING & HEATING              
 
16-0338   Reconstruction               0-001-037  09/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            19,300                  06/06/18   08/06/18    UNITECH SERVICES GROUP              
                                                            003            35,600                  06/06/18   08/06/18    UNITECH SERVICES GROUP              
                                                            1              46,800                  06/06/18   08/06/18    UNITECH SERVICES GROUP, INC.        
 
19-1167   Reconstruction               0-001-038  04/17/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1317   Reconstruction               0-001-039  09/14/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           131,189                  06/08/23     /  /      BERTUSSIN CONTRACTING               
                                                            001                 0                  09/19/23     /  /      TALT ELECTRIC                       
                                                            002                 0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            002                 0                  09/19/23   01/02/24    TALT ELECTRIC                       
                                                            003                 0                  06/08/23   12/29/23    BERTUSSI CONTRACTING                
                                                            003                 0                  09/19/23     /  /      TALT ELECTRIC                       
                                                            004                 0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            004                 0                  09/19/23     /  /      TALT ELECTRIC                       
                                                            005                 0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            005                 0                  09/19/23     /  /      TALT ELECTRIC                       
                                                            006                 0                  09/19/23     /  /      TALT ELECTRIC                       
                                                            007                 0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            007                 0                  09/19/23     /  /      TALT ELECTRIC                       
                                                            008                 0                  09/19/23     /  /      TALT ELECTRIC                       
                                                            009             1,984                  09/19/23     /  /      TALT ELECTRIC                       
                                                            01-MC               0                  08/30/23     /  /      BERTUSSI CONTRACTING                
                                                            01-PC               0                  06/08/23   01/02/24    S&L PLUMBING AND HEATING            
                                                            010             4,221                  09/19/23     /  /      TALT ELECTRIC                       
                                                            011             7,634                  09/19/23     /  /      TALT ELECTRIC                       
                                                            017             5,391                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            018            17,104                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            019               856                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            02-MC               0                  08/30/23     /  /      BERTUSSI CONTRACTING                
                                                            02-PC               0                  06/08/23     /  /      S&L PLUMBING AND HEATING            
                                                            020               438                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            021             2,265                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            022           -28,323                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            023           -13,123                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            024            -8,894                  09/08/23   12/22/23    BERTUSSI CONTRACTING INC            
                                                            03-pc               0                  08/02/23     /  /      S&L PLUMBING & HEATING              
                                                            06                  0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            08                  0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            09                  0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            1                   0                  06/08/23   01/02/24    BERTUSSI CONTRACTING                
                                                            10                  0                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            11                729                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            12              4,998                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            13              4,703                  06/08/23     /  /      BERTUSSI CONTRACTING                
                                                            14_GC           4,663                  08/29/23   12/18/23    BERTUSSI CONTRACTING                
                                                            15_GC          16,866                  08/29/23     /  /      BERTUSSI CONTRACTING                
                                                            16_GC          76,435                  08/29/23     /  /      BERTUSSI CONTRACTING                
 
22-0796FB Reconstruction               0-001-040  03/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mamaroneck Sr High (Palmer Bldg):
93-1246   Reconstruction               0-002-004  06/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0058   Reconstruction               0-002-005  08/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0568   Reconstruction               0-002-008  12/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1098   Reconstruction               0-002-009  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1273   Reconstruction               0-002-010  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0669   Reconstruction               0-002-011  03/12/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0412   Reconstruction               0-002-012  04/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,621                  02/19/02   04/01/02    Greenstar Enterprises               
                                                            2              38,785                  02/19/02   04/01/02    Greenstar Enterprises               
                                                            4               5,095                  12/04/02   01/03/03    Arch. Windows Mfg.                  
 

          Central School:
92-1064   Reconstruction               0-003-005  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2446   Reconstruction               0-003-006  01/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -2,500                  11/15/04   01/03/05    OHM'S Electrical Corp               
                                                            01             -2,000                  11/15/04   01/03/05    OHM'S Electrical Corp               
                                                            01              7,000                  09/15/05   09/20/05    KMK Construction                    
                                                            01             75,400                  09/23/05   10/04/05    Innovative Electric of New York     
                                                            02              6,000                  09/15/05   09/20/05    KMK Construction                    
                                                            03             20,000                  09/15/05   09/20/05    KMK Construction                    
                                                            04             20,000                  09/15/05   09/22/05    KMK Construction Inc                
                                                            05             48,000                  09/15/05   09/22/05    KMk Construction                    
                                                            06              2,500                  09/15/05   09/22/05    KMK Construction                    
                                                            07              4,500                  09/15/05   09/22/05    KMK Construction                    
                                                            08              3,000                  09/23/05   10/05/05    KMK Construction                    
                                                            09              8,250                  09/23/05   10/04/05    KMK Construction                    
                                                            1               2,960                  11/15/04   01/03/05    OHM'S Electrical Corp               
                                                            1              -2,100                  12/27/05   01/19/06    Chaim Cohen Plumbing                
                                                            10              1,000                  09/23/05   10/04/05    KMk Construction                    
                                                            11              1,500                  09/23/05   10/04/05    KMK Construction                    
                                                            12              5,750                  09/23/05   10/04/05    KMK Construction                    
                                                            13              3,000                  09/23/05   10/04/05    KMK construction inc                
                                                            14              3,500                  09/23/05   10/04/05    KMK Construction                    
                                                            15              6,632                  09/23/05   10/04/05    KMK Construction                    
                                                            2              29,848                  06/19/06   05/09/07    Innovative Electrical               
                                                            3               7,300                  06/19/06   03/15/07    Innovative Electric                 
                                                            4              18,405                  09/20/06   05/09/07    Innovative Electric                 
 
95-1609   Reconstruction               0-003-007  06/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0564   Reconstruction               0-003-008  12/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1099   Reconstruction               0-003-009  05/02/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0692   Reconstruction               0-003-010  03/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0418   Reconstruction               0-003-011  06/02/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -21,957                  02/19/02   04/04/02    Rure Assoc.                         
                                                            2              -3,350                  02/19/02   04/04/02    Rure Assoc.                         
 
10-0343   Reconstruction               0-003-013  01/18/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1             162,000                  05/27/11     /  /      BERTUSSI'S CONTRACTING SERVICES     
                                                            1              15,707                  09/30/11   12/09/11    EVERFOAM INSULATION SYSTEMS INC     
                                                            1              44,520                  10/26/11     /  /      TALT ELECTRIC                       
                                                            1               9,271                  11/28/11   02/24/12    FOURMEN CONSTRUCTION INC            
                                                            2               5,175                  11/28/11   02/24/12    FOURMEN CONSTRUCTION INC            
                                                            2               6,353                  11/28/11   02/10/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            2              39,271                  11/28/11   02/10/12    TALT ELECTRIC                       
                                                            3               4,312                  11/28/11   02/24/12    FOURMEN CONSTRUCTION INC            
                                                            3               2,297                  11/28/11   02/10/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            3              26,711                  11/28/11   02/10/12    TALT ELECTRIC                       
                                                            4              17,890                  11/28/11   02/10/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            4               2,702                  02/13/12   05/23/12    FOURMEN CONSTRUCTION INC            
                                                            5              18,255                  11/28/11   02/10/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            5               4,346           4,346  02/13/12   07/12/12    FOURMEN CONSTRUCTION INC            
 
10-0941   Reconstruction               0-003-014  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1336   Reconstruction               0-003-015  07/06/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mamaroneck Ave. Elementary:
92-0358   Reconstruction               0-004-011  12/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0005   Additions and Alterations    0-004-012  11/22/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             25,346                  09/23/05   10/04/05    Derosa Tennis Contractor            
                                                            1              26,000                  01/19/06   06/23/06    Subolo Contracting                  
                                                            1               7,570                  02/14/06     /  /      Beneway Inc                         
                                                            1              -4,743                  03/21/06   05/09/06    Mengler Mechanical                  
                                                            1              16,551                  08/17/06     /  /      Talt Electric                       
                                                            1               3,500                  09/20/06   10/30/06    NSC Abatement Service               
                                                            1              63,702                  11/17/06     /  /      innovative Electric                 
                                                            10              5,880                  05/22/06   07/21/06    Subolo Contracting                  
                                                            11              4,661                  06/19/06   06/30/06    Subolo COntracting                  
                                                            12              2,195                  08/17/06   08/30/06    Subolo Contracting                  
                                                            13              1,733                  08/17/06   08/29/06    Subolo Contracting                  
                                                            14             20,500                  08/17/06   08/29/06    Subolo Contracting                  
                                                            15              5,485                  08/17/06   08/29/06    Subolo Contracting                  
                                                            16             15,469                  09/26/06   11/03/06    subolo Contracting                  
                                                            17             72,812                  09/26/06   11/03/06    subolo Contracting                  
                                                            18              4,387                  10/18/06   11/03/06    Subolo Contracting                  
                                                            19              6,699                  10/18/06   11/03/06    subolo Contracting                  
                                                            2               2,500                  02/14/06   02/28/06    Beneway Inc                         
                                                            2               4,649                  01/26/06   07/24/06    Subolo Contracting                  
                                                            2              25,000                  01/26/06   07/24/06    Derosa Tennis Contractor            
                                                            2              19,335                  11/17/06   01/12/07    Talt Electric                       
                                                            2              29,706                  12/04/06     /  /      Mengler Mechanical                  
                                                            2             -10,000                  02/05/07   02/22/07    novative electric of Ny             
                                                            20              8,969                  01/08/07   02/09/07    Subolo Contracting                  
                                                            21              1,906                  01/08/07   02/09/07    Subolo Contracting                  
                                                            22              6,682                  01/08/06   02/09/07    Subolo Contracting                  
                                                            23              6,853                  01/29/07   02/22/07    Subolo Contracting                  
                                                            24              2,718                  01/29/07   02/22/07    Subolo Contracting                  
                                                            25              1,386                  02/05/07   02/22/07    subolo Contracting                  
                                                            26              2,280                  02/05/07   02/22/07    Subolo Contracting                  
                                                            27              2,700                  02/05/07   02/22/07    Subolo Contracting                  
                                                            28              9,934                  02/05/07   02/22/07    Subolo COntracting                  
                                                            3               2,000                  03/02/06   07/21/06    DeRosa Tennis Contractors           
                                                            3              20,122                  03/16/06     /  /      Beneway Inc                         
                                                            3               6,598                  01/26/06   07/24/06    subolo Contracting                  
                                                            3               2,331                  12/04/06   01/24/07    Talt Electric                       
                                                            3              12,733                  02/05/07   02/21/07    Mengler Mechanical                  
                                                            4              77,429                  02/14/06   07/21/06    subolo Contracting                  
                                                            4              16,676                  09/26/06   01/24/07    Beneway inc                         
                                                            4               5,301                  12/04/06   01/24/07    Talt Electric                       
                                                            4               4,750                  02/05/07   02/21/07    Mengler Mechanical                  
                                                            5               3,369                  03/16/06   07/13/06    Subolo Contracting                  
                                                            5              12,731                  09/26/06   01/09/07    Beneway                             
                                                            5               2,700                  02/05/07   02/21/07    Mengler Mechanical                  
                                                            5               5,000                  02/15/07   03/09/07    Talt Electric                       
                                                            6              18,870                  03/27/06   07/13/06    Subolo Contracting corp             
                                                            6              -5,571                  04/02/07   04/06/07    Beneway Inc                         
                                                            7              10,476                  04/25/06   06/23/06    subolo Contracting Corp             
                                                            8               4,736                  05/26/06   07/21/06    Subolo Contracting                  
                                                            9               1,147                  05/22/06   07/21/06    Subolo Contracting                  
 
93-1247   Reconstruction               0-004-013  06/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1248   Reconstruction               0-004-014  06/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1612   Reconstruction               0-004-016  06/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0567   Reconstruction               0-004-017  12/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1215   Reconstruction               0-004-019  04/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0491   Reconstruction               0-004-020  01/29/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,622                  05/03/02   05/03/02    Stack Elec.                         
                                                            1              18,560                  05/03/02   05/03/02    Gabriel Contracting                 
                                                            1               4,612                  05/03/02   01/14/03    Richards's Conditioning             
                                                            2              -6,770                  05/03/02   05/03/02    Stack Elec.                         
                                                            2               4,400                  05/03/02   05/03/02    Gabriel Contracting                 
                                                            2              30,274                  05/03/02   01/14/03    Richard's Conditioning              
                                                            3              39,250                  05/03/02   05/03/02    Gabriel Contracting                 
                                                            3              29,879                  05/03/02   01/14/03    Richard's Conditioning              
 
99-1071   Reconstruction               0-004-021  05/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              35,058                  01/21/03   01/23/03    Fourmen Const.                      
                                                            1              18,828                  10/31/03   12/30/03    RLJ Elec.                           
                                                            3               4,000                  09/24/01   01/14/02    Arch. Windows Mfg.                  
                                                            4                 471                  01/02/03   01/02/03    Arch. Windows Mfg.                  
 
10-0942   Reconstruction               0-004-024  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1393   Reconstruction               0-004-025  07/04/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0509   Reconstruction               0-004-026  02/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0367   Reconstruction               0-004-027  04/02/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,901                  10/02/14   10/08/14    Divine Construction                 
 
14-1493   Reconstruction               0-004-029  05/20/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1295   Reconstruction               0-004-030  08/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2A-01         112,875                  08/24/21   05/06/22    RENU CONTRACTING&RESTORATION,INC    
                                                            2A-01         112,875                  10/12/21   12/02/22    Renu Contracting & Restoration, Inc 
                                                            2A-01         112,875                  11/10/22     /  /      RENU CONTRACTING & RESTORATION INC  
                                                            2A-02          22,247                  11/10/22   12/08/23    RENU CONTRACTING & RESTORATION INC  
                                                            2A-03          11,678                  11/10/22   12/08/23    RENU CONTRACTING & RESTORATION INC  
                                                            2A-04          10,959                  11/10/22   12/08/23    RENU CONTRACTING & RESTORATION INC  
                                                            2A-05          18,460                  11/10/22   12/08/23    RENU CONTRACTING & RESTORATION INC  
                                                            2A-06          31,415                  11/10/22   12/07/23    RENU CONTRACTING & RESTORATION INC  
                                                            2A-07          21,492                  11/10/22   12/08/23    RENU CONTRACTING & RESTORATION INC  
                                                            2A-08           3,010                  06/08/23     /  /      RENU CONTRACTING                    
                                                            2B-01          18,586                  11/10/22   07/25/23    ABM AIR CONDITIONING & HEATING INC  
                                                            2B-02          25,000                  11/10/22   07/25/23    ABM AIR CONDITIONING & HEATING INC. 
                                                            2C-01           9,145                  11/10/22   07/25/23    TWP PLUMBING & HEATING, INC         
                                                            2C-01           9,145                  06/08/23   01/02/24    TWP PLUMBING & HEATING              
                                                            2C-02           2,021                  11/10/22   07/25/23    TWP PLUMBING & HEATING, INC.        
                                                            2C-02           2,021                  06/08/23   01/02/24    TWP PLUMBING & HEATING              
                                                            2D-01          20,581                  11/10/22   07/25/23    ALL BRIGHT ELECTRIC                 
                                                            2D-02          15,986                  11/10/22   07/25/23    ALL BRIGHT ELECTRIC                 
                                                            2D-03          11,607                  11/10/22   07/25/23    ALL BRIGHT ELECTRIC                 
                                                            2D-04          15,593                  11/10/22   07/25/23    ALL BRIGHT ELECTRIC                 
                                                            2D-05           4,954                  11/10/22   07/27/23    ALL BRIGHT ELECTRIC                 
                                                            2D-06           5,130                  11/10/22   07/27/23    ALL BRIGHT ELECTRIC                 
                                                            2a-09           5,590                  08/23/23   12/18/23    Renu Contracting & Restoration Inc  
 
22-0391   Reconstruction               0-004-031  12/17/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0806FB Reconstruction               0-004-032  03/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1319   Reconstruction               0-004-033  06/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Chatsworth Avenue School:
92-1065   Reconstruction               0-005-006  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1249   Reconstruction               0-005-007  06/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2447   Reconstruction               0-005-008  01/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            01              1,841                  09/13/04   10/04/04    OHM'S Elec.                         
                                                            01             -9,165                  09/13/04   10/04/04    C&M Door Controls                   
                                                            01             -5,835                  10/08/04   10/12/04    Wescon Plumbing                     
                                                            01            -11,707                  12/02/04   02/11/05    OHM'S Electrical                    
                                                            01             -4,000                  12/07/04   01/03/05    ACS Systems Associates              
                                                            02             11,800                  11/15/04   04/28/05    OHM;S Electrical                    
                                                            02             -6,695                  03/23/05   04/01/05    Cand M Door Controls                
                                                            03                620                  11/15/04   01/03/05    OHM'S Electrical                    
                                                            08             -2,578                  12/02/04   02/11/05    KMK Construction                    
                                                            1               7,293                  11/15/04   04/28/05    KMK Construction                    
                                                            2              16,000                  12/02/04   02/11/05    KMk Construction                    
                                                            3               4,000                  12/02/04   01/03/05    KMK Construction                    
                                                            4               1,500                  12/02/04   01/03/05    KMk construction                    
                                                            5               4,578                  12/02/04   02/11/05    KMK Construction                    
                                                            6               1,000                  12/02/04   01/03/05    KMK Construction                    
                                                            7              10,000                  12/02/04   01/03/05    KMK Construction                    
 
95-1611   Reconstruction               0-005-009  06/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0566   Reconstruction               0-005-010  12/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1100   Reconstruction               0-005-011  05/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0420   Reconstruction               0-005-012  02/08/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              49,950                  03/27/03   03/28/03    Etre Assoc.                         
                                                            1              12,805                  03/27/03   03/28/03    V&G Elec.                           
                                                            1               7,800                  04/30/03   05/02/03    L&C Europa Contracting              
                                                            2              22,000                  03/27/03   03/28/03    Etre Assoc.                         
                                                            2              40,163                  03/27/03   03/28/03    V&G Elec.                           
                                                            3              15,740                  03/27/03   03/28/03    Etre Assoc.                         
                                                            4               8,163                  03/27/03   03/28/03    Etre Assoc.                         
                                                            6              -6,625                  05/15/03   05/20/03    Etre Assoc.                         
 
08-0434   Reconstruction               0-005-014  02/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,301                  10/21/09   11/23/09    RENU RESTORATION & CONTRACTING      
 
09-0272   Reconstruction               0-005-015  11/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0363   Reconstruction               0-005-016  11/02/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -8,232                  11/07/11   01/10/12    ARCH CONCEPT CONSTRUCTION INC       
 
10-0943   Reconstruction               0-005-017  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0762   Reconstruction               0-005-018  04/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0366   Reconstruction               0-005-019  04/02/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            12-01         274,600                  09/07/18   09/14/18    PVS CONSTRUCTION LLC                
                                                            12-02           4,800                  09/07/18   09/14/18    PVS CONSTRUCTION LLC                
 
19-1227   Reconstruction               0-005-020  08/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3C-01          11,793                  08/24/21   11/18/22    SOUTHEAST PLUMBING CORP             
                                                            3C-01          11,793                  10/12/21   11/25/22    Southeast Plumbing Corp             
                                                            3C-01          11,793                  11/10/22   07/25/23    SOUTHEAST PLUMBING CORP             
                                                            3C-02           4,073                  08/24/21   11/25/22    SOUTHEAST PLUMBING CORP             
                                                            3C-02           4,073                  10/12/21   11/18/22    Southeast Plumbing Corp             
                                                            3C-02           4,073                  11/10/22   07/25/23    SOUTHEAST PLUMBING CORP.            
                                                            3C-03           9,973                  11/10/22   12/13/23    SOUTHEAST PLUMBING CORP.            
                                                            3C-04           5,452                  08/24/23   12/19/23    SOUTHEAST PLUMBING CORP             
                                                            3C-05           5,686                  08/24/23   12/19/23    SOUTHEAST PLUMBING CORP             
                                                            3C-060          6,536                  08/24/23   12/19/23    SOUTHEAST PLUMBING CORP             
                                                            3C-07           1,168                  08/24/23   12/19/23    SOUTHEAST PLUMBING CORP             
                                                            3C-08           8,154                  08/24/23   12/19/23    SOUTHEAST PLUMBING CORP             
                                                            3D-007         22,712                  11/10/22   07/25/23    HEALY ELECTRICAL CONTRACTING INC    
                                                            3D-008         16,096                  11/10/22   07/25/23    HEALY ELECTRICAL CONTRACTING, INC   
                                                            3D-009         19,399                  11/10/22   07/25/23    Healy Electrical Contracting inc    
                                                            3D-01           3,540                  08/24/21     /  /      HEALY ELECTRICAL CONTRACTING, INC   
                                                            3D-01           3,540                  10/12/21   11/18/22    Healy Electrical Contracting, Inc   
                                                            3D-010         -9,814                  06/08/23   01/02/24    HEALY ELECTRICAL CONTRACTING        
                                                            3D-02           1,790                  08/24/21   11/18/22    HEALY ELECTRICAL CONTRACTING, INC   
                                                            3D-02           1,790                  10/12/21     /  /      Healy Electrical Contracting, Inc   
                                                            3D-03           9,130                  08/24/21   11/25/22    HEALY ELECTRICAL CONTRACTING,INC    
                                                            3D-03           9,130                  10/12/21   11/18/22    Healy Electrical Contracting, Inc   
                                                            3D-04           1,859                  08/24/21   11/25/22    HEALY ELECTRICAL CONTRACTING, INC   
                                                            3D-04           1,859                  10/12/21   11/18/22    Healy Electrical Contracting, Inc   
                                                            3D-05           3,196                  08/24/21   11/25/22    HEALY ELECTRICAL CONTRACTING, INC   
                                                            3D-05           3,196                  10/12/21   11/18/22    Healy Electrical Contracting, Inc   
                                                            3D-06           5,483                  08/24/21   11/25/22    HEALY ELECTRICAL CONTRACTING, INC   
                                                            3D-06           5,483                  10/12/21   11/18/22    Healy Electrical Contracting Inc    
                                                            3D-11           2,011                  06/08/23   01/02/24    HEALY ELECTRICAL CONTRACTING        
                                                            3D-12           1,305                  06/08/23   01/02/24    HEALY ELECTRICAL CONTRACTING        
                                                            3D-13           5,109                  06/08/23   01/02/24    HEALY ELECTRICAL CONTRACTING        
                                                            3D-14           5,776                  06/08/23   01/02/24    HEALY ELECTRICAL CONTRACTING        
                                                            3D-15           1,382                  08/30/23     /  /      HEALY ELECTRICAL CONTRCATING        
                                                            3D-16           3,205                  08/30/23     /  /      HEALY ELECTRICAL CONTRACTING        
                                                            3D-17           2,916                  08/30/23     /  /      HEALY ELECTRICAL CONTRACTING        
                                                            3D-18           9,741                  08/30/23     /  /      HEALY ELECTRICAL CONTRACTING        
 

          Murray Avenue Elementary:
92-1066   Reconstruction               0-007-006  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1250   Reconstruction               0-007-007  06/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0252   Reconstruction               0-007-008  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,341                  10/20/03   11/04/03    Fourmen Construction                
                                                            1              94,450                  10/20/03   11/04/03    Solar Electric                      
                                                            1              -2,183                  11/28/03   01/14/04    Mengler Mech.                       
                                                            1              -9,944                  01/27/04   04/13/04    J&M Heating                         
                                                            10              6,199                  10/20/03   11/04/03    Fourmen Construction                
                                                            11             10,588                  11/28/03   12/04/03    Fourmen Cosntruction                
                                                            12              3,184                  11/28/03   04/05/04    Fourmen Construction                
                                                            13             20,311                  11/28/03   12/04/03    Fourmen Construction                
                                                            14             -4,244                  01/27/04   01/29/04    Fourmen Construction                
                                                            15             17,241                  02/02/04   02/20/04    Fourmen Construction                
                                                            2              31,597                  10/20/03   11/04/03    Fourmen Construction                
                                                            2              -4,244                  01/27/04   04/13/04    Mengler Mech.                       
                                                            2              18,683                  03/23/04   01/04/07    Solar Electric                      
                                                            2              20,775                  09/14/04   10/28/04    J&M Heating                         
                                                            3              19,897                  10/20/03   11/04/03    Fourmen Construction                
                                                            3              -4,244                  01/27/04   04/13/04    Solar Electric                      
                                                            4              19,650                  10/20/03   11/04/03    Fourmen Construction                
                                                            4              23,276                  02/17/04   06/10/04    Solar Electric                      
                                                            5              30,798                  10/20/03   11/04/03    Fourmen Construction                
                                                            6               9,546                  10/20/03   11/04/03    Fourmen Construction                
                                                            7               8,320                  10/20/03   11/04/03    Fourmen Construction                
                                                            8               2,745                  10/20/03   11/04/03    Fourmen Construction                
                                                            9              30,000                  10/20/03   11/04/03    Fourmen Construction                
 
94-1015   Reconstruction               0-007-009  05/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1610   Reconstruction               0-007-010  06/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0565   Reconstruction               0-007-011  12/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1554   Reconstruction               0-007-012  06/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1452   Reconstruction               0-007-013  07/21/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,940                  11/19/01   01/08/02    Etre Assoc.                         
                                                            1               5,938                  11/19/01   01/08/02    Dalbar Elec.                        
 
98-0419   Reconstruction               0-007-014  02/16/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,253                  05/03/02   05/06/02    Architectural Window                
                                                            1              22,253                  05/16/02   06/04/02    Architectural Window                
                                                            2              -3,090                  04/05/02   06/04/02    Architectural Window                
 
01-0911   Reconstruction               0-007-016  04/09/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -18,130                  10/15/02   12/02/02    BBR Contracting                     
                                                            2              27,394                  10/15/02   12/02/02    BBR Contracting                     
                                                            3               5,194                  10/15/02   12/02/02    BBR Contracting                     
                                                            4               3,447                  10/15/02   12/02/02    BBR Contracting                     
 
08-0435   Reconstruction               0-007-018  02/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0944   Reconstruction               0-007-020  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0510   Reconstruction               0-007-021  02/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0671   Reconstruction               0-007-022  04/23/13  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1271   Reconstruction               0-007-024  03/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02            -33,674                  11/10/22   07/25/23    TALT ELECTRIC                       
 
19-1745   Reconstruction               0-007-025  07/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-4A               0                  06/08/23     /  /      RENU CONTRACTING                    
                                                            01-4C               0                  08/24/23     /  /      J&M HEATING & A/C                   
                                                            013             8,943                  06/07/23   01/02/24    RENU CONTRACTING & RESTORATION      
                                                            015            32,820                  08/24/23     /  /      RENU CONTRACTING & RESTORATION      
                                                            016           190,158                  08/24/23     /  /      RENU CONTRACTING & RESTORATION      
                                                            02-4A               0                  06/08/23     /  /      REMU CONTRACTING                    
                                                            03-4A               0                  06/08/23     /  /      RENU CONTRACTING                    
                                                            04-4A               0                  06/08/23     /  /      RENU CONTRACTING                    
                                                            05-4A          31,013                  06/08/23   12/18/23    RENU CONTRACTING                    
                                                            05-4A          31,013                  06/14/23     /  /      TRITON CONSTRUCTION                 
                                                            06-4A           1,271                  06/08/23     /  /      RENU CONTRACTING                    
                                                            06-4A           8,731                  06/08/23     /  /      RENU CONTRACTING                    
                                                            08-4A          17,398                  06/08/23     /  /      RENU CONTRACTING                    
                                                            09-4A         159,500                  06/08/23     /  /      RENU CONTRACTING                    
                                                            1-4B                0                  08/29/23     /  /      BERTUSSI CONTRCATING                
                                                            1-4D                0                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELECTRIC        
                                                            10-4A          20,159                  06/07/23   01/02/24    RENU CONTRACTING                    
                                                            11-4A           7,336                  06/07/23   01/02/24    RENU CONTRACTING                    
                                                            12-4A          46,969                  06/07/23     /  /      RENU CONTRACTING & RESTORATION      
                                                            14              7,093                  08/24/23     /  /      RENU CONTRACTING & RESTORATION      
                                                            2-4B                0                  08/29/23     /  /      BERTUSSI CONTRACTING                
                                                            2-4D                0                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELECTRIC        
                                                            3-4D                0                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELECTRIC        
                                                            4-4D                0                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELEC            
                                                            5-4D              914                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELECTRIC        
                                                            6-4D            2,934                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELECTRIC        
                                                            7-4D            9,652                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELEC            
                                                            8-4D            5,964                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELEC            
                                                            9-4D           12,185                  09/01/23   12/29/23    CONSOLIDATED HUDSON ELECTRIC        
 

          Hommocks Junior High School:
90-0656   Reconstruction               0-011-006  01/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1905   Reconstruction               0-011-007  07/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1067   Reconstruction               0-011-008  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1251   Reconstruction               0-011-009  06/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1613   Reconstruction               0-011-011  06/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0563   Reconstruction               0-011-012  12/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0542   Reconstruction               0-011-013  01/02/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              58,000                  09/24/01   12/01/03    MBL Contracting                     
 
97-1551   Reconstruction               0-011-015  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0350   Additions and Alterations    0-011-016  02/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02              2,379                  10/04/04   10/18/04    Weiss and Sons                      
                                                            1               4,980                  12/07/01   04/05/02    Frank & Lindy Plumbing              
                                                            1              11,500                  03/18/02   04/29/02    Talt Elec.                          
                                                            1              12,153                  03/25/02   04/07/05    Mengler Contracting                 
                                                            1              18,000                  05/03/02   05/06/02    Infinity Environ.                   
                                                            1               9,665                  05/03/02   05/06/02    Telcar Group Ltd.                   
                                                            1              10,000                  02/12/02   05/24/02    Delcon                              
                                                            1                -513                  06/06/02   08/15/02    Piccini Industries                  
                                                            1               5,000                  01/21/04   01/28/04    Barbizon Elec.                      
                                                            1                 878                  10/04/04   10/18/04    Weiss and Sons                      
                                                            1               3,403                  06/28/05   07/19/05    Earl Fisher                         
                                                            10             15,000                  02/12/02   05/24/02    Delcon                              
                                                            10              8,400                  09/25/03   10/07/03    Infinity Environ.                   
                                                            10              1,675                  11/28/03   12/26/03    Piccini Industries                  
                                                            10              3,700                  12/21/04   12/30/04    Talt Elec.                          
                                                            10              1,115                  04/06/05   04/07/05    Mengler Contracting                 
                                                            11             20,000                  02/12/02   05/24/02    Delcon                              
                                                            11             13,345                  01/21/03   02/12/03    Talt Elec.                          
                                                            11             14,667                  09/25/03   10/22/03    Infinity Environ.                   
                                                            11             11,823                  01/13/04   03/08/04    Piccini Industries                  
                                                            11              1,156                  04/06/05   04/07/05    Mengler Contracting                 
                                                            12             20,000                  02/12/02   05/24/02    Delcon                              
                                                            12            -27,000                  09/25/03   10/22/03    Infinity Environ.                   
                                                            12             -1,287                  04/06/05   04/07/05    Mengler Contracting                 
                                                            13             20,000                  02/12/02   05/24/02    Delcon                              
                                                            13             13,500                  12/09/02   01/08/03    Mengler Contracting                 
                                                            13             -7,000                  11/03/03   11/18/03    Infinity Environ.                   
                                                            14             20,000                  02/12/02   05/24/02    Delcon                              
                                                            14              9,290                  01/21/03   02/12/03    Mengler Contracting                 
                                                            15             20,000                  02/12/02   05/24/02    Delcon                              
                                                            15              7,808                  05/15/03   05/23/03    Mengler Contracting                 
                                                            16             20,000                  02/12/02   05/24/02    Delcon                              
                                                            16             11,037                  04/06/05   04/07/05    Mengler Contracting                 
                                                            17             20,000                  02/12/02   05/24/02    Delcon                              
                                                            17              6,698                  04/06/05   04/07/05    Mengler Contracting Inc             
                                                            18             20,000                  02/12/02   05/24/02    Delcon                              
                                                            18             76,048                  04/06/05   04/07/05    Mengler Contracting                 
                                                            19              5,400                  02/12/02   05/24/02    Delcon                              
                                                            19             22,664                  04/06/05   04/07/05    Mengler Contracting                 
                                                            2              11,500                  03/18/02   04/29/02    Talt Elec.                          
                                                            2                -915                  05/09/02   05/14/02    Frank & Lindy Plumbing              
                                                            2              18,000                  11/19/01   05/22/02    Infinity Environ.                   
                                                            2              20,000                  02/12/02   05/24/02    Delcon                              
                                                            2              10,785                  06/06/02   08/15/02    Piccini Industries                  
                                                            2               1,475                  11/03/03   11/18/03    Telcar Group                        
                                                            2               4,150                  04/06/05   04/07/05    Mengler Contracting                 
                                                            20              9,000                  02/12/02   05/24/02    Delcon                              
                                                            20             11,640                  11/28/03   01/05/04    Talt Elec.                          
                                                            21              8,000                  02/12/02   05/24/02    Delcon                              
                                                            21             25,550                  05/06/04   05/14/04    Talt Elec.                          
                                                            21              7,154                  12/21/04   04/07/05    Mengler Contracting                 
                                                            22              7,000                  02/12/02   05/24/02    Delcon                              
                                                            22              8,648                  12/21/04   12/30/04    Talt Elec.                          
                                                            22              7,605                  12/21/04   12/30/04    Mengler Contracting                 
                                                            23             20,000                  02/12/02   05/24/02    Delcon                              
                                                            23              9,367                  12/21/04   12/30/04    Talt Elec.                          
                                                            23              9,615                  12/21/04   12/30/04    Mengler Contracting                 
                                                            24             20,000                  02/12/02   05/24/02    Delcon                              
                                                            24              5,301                  12/21/04     /  /      Talt Elec.                          
                                                            24              7,935                  12/21/04   12/30/04    Mengler Contracting                 
                                                            25             19,521                  02/12/02   05/24/02    Delcon                              
                                                            25              5,607                  12/21/04     /  /      Talt Elec.                          
                                                            25              9,753                  12/10/04   04/07/05    Mengler Contracting                 
                                                            26             20,000                  02/12/02   05/24/02    Delcon                              
                                                            27             18,182                  02/12/02   05/24/02    Delcon                              
                                                            28             20,000                  02/12/02   05/24/02    Delcon                              
                                                            29             20,000                  02/12/02   05/24/02    Delcon                              
                                                            3              11,500                  03/18/02   04/29/02    Talt Elec.                          
                                                            3              18,000                  11/19/01   05/22/02    Infinity Environ.                   
                                                            3              10,000                  02/12/02   05/24/02    Delcon                              
                                                            3              22,700                  06/06/02   08/15/02    Piccini Industries                  
                                                            3                 606                  05/15/03   05/23/03    Frank & Lindy Plumbing              
                                                            3               8,950                  11/03/03   11/18/03    Telcar Group                        
                                                            3               1,166                  04/06/05   04/07/05    Mengler Contracting Inc             
                                                            30             20,000                  02/12/02   05/24/02    Delcon                              
                                                            31             17,440                  02/12/02   05/24/02    Delcon                              
                                                            32             68,682                  02/12/02   05/24/02    Delcon                              
                                                            4              11,500                  03/18/02   04/29/02    Talt Elec.                          
                                                            4              18,000                  11/19/01   05/22/02    Infinity Environ.                   
                                                            4              20,000                  02/12/02   05/24/02    Delcon                              
                                                            4              35,125                  06/06/02   08/15/02    Piccini Industries                  
                                                            4               2,936                  07/17/03   07/24/03    Frank & Lindy Plumbing              
                                                            4               2,500                  11/03/03   11/18/03    Telcar Group                        
                                                            4               2,283                  04/06/05   04/07/05    Mengler Contracting Inc             
                                                            5               4,800                  03/18/02   04/29/02    Talt Elec.                          
                                                            5               8,000                  11/19/01   05/22/02    Infinity Environ.                   
                                                            5              13,000                  02/12/02   05/24/02    Delcon                              
                                                            5              10,880                  11/07/02   01/10/03    Piccini Industries                  
                                                            5               4,035                  07/17/03   07/24/03    Frank & Lindy Plumbing              
                                                            5                 528                  04/06/05   04/07/05    Mengler Contracting                 
                                                            6              12,600                  11/19/01   05/22/02    Infinity Environ.                   
                                                            6              20,000                  02/12/02   05/24/02    Delcon                              
                                                            6               3,353                  07/17/03   07/24/03    Frank & Lindy Plumbing              
                                                            6              17,700                  07/17/03   07/24/03    Piccini Industries                  
                                                            6              -1,609                  12/21/04   12/30/04    Talt Elec.                          
                                                            6              11,000                  04/06/05   04/07/05    Mengler Contracting                 
                                                            7              10,750                  11/19/01   05/22/02    Infinity Environ.                   
                                                            7              12,000                  02/12/02   05/24/02    Delcon                              
                                                            7              16,445                  05/21/03     /  /      Talt Elec.                          
                                                            7               6,751                  07/17/03   07/24/03    Piccini Industries                  
                                                            7              10,263                  04/06/05   04/07/05    Mengler Contracting                 
                                                            8              13,600                  11/19/01   05/22/02    Infinity Environ.                   
                                                            8              20,000                  02/12/02   05/24/02    Delcon                              
                                                            8               9,776                  05/21/03     /  /      Talt Elec.                          
                                                            8              17,542                  03/05/04   04/07/04    Piccini Industries                  
                                                            8               6,351                  04/06/05   04/07/05    Mengler Contracting                 
                                                            9              15,000                  02/12/02   05/24/02    Delcon                              
                                                            9              14,184                  05/21/03     /  /      Talt Elec.                          
                                                            9               3,100                  09/25/03   10/22/03    Infinity Environ.                   
                                                            9              16,459                  03/05/04   04/07/04    Piccini Industries                  
                                                            9               7,340                  04/06/05   04/07/05    Mengler Contracting                 
                                                            ECNY 1          8,304                  04/13/05   04/26/05    ECNY                                
                                                            ECNY 2          3,550                  04/13/05   04/26/05    ECNY                                
                                                            ECNY 3         11,520                  04/13/05   04/26/05    ECNY                                
                                                            ECNY 5            860                  04/13/05   04/26/05    ECNY                                
                                                            ECNY4           8,160                  04/13/05   04/26/05    ECNY                                
 
99-1055   Reconstruction               0-011-017  05/09/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1               756                  05/03/02   05/03/02    Hammond Elec.                       
                                                            E-2             4,384                  05/15/03   05/20/03    Hammond Elec.                       
                                                            E-3               979                  05/15/03   05/20/03    Hammond Elec.                       
                                                            E-4               380                  05/15/03   05/20/03    Hammond Elec.                       
                                                            GC-1          -26,000                  05/03/02   05/03/02    Able Carpenter                      
                                                            GC-2           12,100                  05/15/03   05/20/03    Able Carpenter                      
                                                            M-1             4,197                  05/03/02   05/03/02    Mengler Contracting                 
                                                            P-1               805                  06/03/02   06/03/02    Mengler Contracting                 
                                                            P-2             1,050                  06/03/02   06/03/02    Mengler Contracting                 
                                                            P-3            11,535                  06/03/02   06/03/02    Mengler Contracting                 
 
00-0721   Additions and Alterations    0-011-018  08/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              74,769                  08/14/02   11/01/02    Mengler Contracting                 
                                                            1              11,904                  12/04/02   01/02/03    Hammond Elec.                       
                                                            1              44,312                  12/09/02   01/08/03    Fourmen Const.                      
                                                            2               6,441                  12/04/02   01/02/03    Hammond Elec.                       
                                                            2 Rev.         11,231                  12/04/02   01/02/03    Mengler Contracting                 
 
02-2448   Reconstruction               0-011-019  01/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -6,600                  10/08/04   10/12/04    C&M Door Controls                   
                                                            02             14,920                  10/08/04   10/12/04    C&M Door Controls                   
                                                            03             -2,000                  03/23/05   04/01/05    Cand M Door Controls                
 
02-2379   Reconstruction               0-011-020  02/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           107,000                  11/17/05   12/07/05    talt Electric                       
                                                            E-4            12,803                  06/19/06   03/15/07    talt Electric                       
                                                            E2             10,491                  03/23/06   05/25/06    talt Electric                       
                                                            E2              5,803                  05/18/06   03/15/07    talt electric                       
                                                            E5              2,165                  09/20/06   12/18/06    Talt Electric                       
                                                            GC-1           15,210                  12/27/05   06/09/06    Summit Construction Service         
                                                            GC-10          34,765                  09/26/06   11/30/06    Summit Construction                 
                                                            GC-11          44,346                  06/28/07   07/17/07    Summit Construction                 
                                                            GC-2          128,000                  12/27/05   06/09/06    Summit Construction                 
                                                            GC-3           27,108                  12/27/05   06/09/06    Summit Construction                 
                                                            GC-4           66,926                  02/27/06   07/21/06    Summit Construction                 
                                                            GC-5           62,006                  03/16/06   05/23/06    Summit Construction Service         
                                                            GC-7           83,340                  07/03/06   06/05/13    Summit Construction                 
                                                            GC-8           33,211                  06/19/06   07/14/06    Summit Construction                 
                                                            GC12          112,773                  01/15/10   05/10/10    SUMMIT CONSTRUCTION SERVICES GROUP  
                                                            GC9             4,240                  06/26/06   07/13/06    Summit Construction                 
                                                            M-1           -35,000                  12/27/05   01/19/06    Mengler Mechanical                  
                                                            M-2             9,029                  05/17/06   03/15/07    Mengler mechanical                  
                                                            M-3             2,837                  11/30/06   03/15/07    Mengler Mechanical                  
                                                            P-1            27,039                  12/27/05   01/19/06    Mengler Mechanical                  
                                                            P-2            13,800                  12/27/05   01/19/06    Mengler Mechanical                  
                                                            P-6             9,134                  03/27/06   05/24/06    Mengler Mechanical                  
                                                            P-8             3,377                  06/19/06   11/30/06    Mengler Mechanical                  
                                                            P-9            33,731                  09/29/06     /  /      Mengler Mechanical                  
                                                            P3             10,685                  12/27/05   01/19/06    Mengler Mechanical Inc              
                                                            P4              8,941                  12/27/05   01/19/06    Mengler Mechanical                  
                                                            P5              8,716                  03/27/06   05/24/06    Mengler Mechanical                  
                                                            P7              9,834                  03/27/06   05/09/07    Mengler Mechanical                  
                                                            S-1            -4,450                  08/17/06   08/29/06    STS Steel                           
 
10-0215   Reconstruction               0-011-021  10/20/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,398                  09/16/11   12/29/11    HYGRADE INSULATORS INC              
                                                            2              11,500          11,500  11/07/11   01/24/12    HYGRADE INSULATORS INC              
 
09-0401   Reconstruction               0-011-022  03/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1             178,826                  08/30/10   09/22/10    TALT ELECTRIC                       
                                                            1              41,207                  08/30/10   09/22/10    FOURMEN CONSTRUCTION INC            
                                                            1             106,115                  09/27/10   11/04/10    MENGLER CONTRACTING INC             
                                                            1             -60,000                  09/27/10   11/04/10    INDUSTRIAL WINDOW CORPORATION       
                                                            1              27,892                  11/18/10   11/19/10    BERTUSSI'S CONTRACTING SERVICES     
                                                            10             13,387                  12/20/10   12/30/10    FOURMEN CONSTRUCTION INC            
                                                            10             10,990                  06/10/11   06/16/11    BERTUSSI'S CONTRACTING SERVICES     
                                                            10             13,500                  04/05/12   10/24/12    TALT ELECTRIC                       
                                                            11             21,661                  12/20/10   12/30/10    FOURMEN CONSTRUCTION INC            
                                                            11             25,048                  11/07/11   10/24/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            12              2,296                  12/20/10   12/30/10    FOURMEN CONSTRUCTION INC            
                                                            12             15,833                  11/07/11   01/10/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            13              4,365                  12/20/10   12/30/10    FOURMEN CONSTRUCTION INC            
                                                            13             29,399                  11/07/11   05/15/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            14             11,664                  02/22/11   03/18/11    FOURMEN CONSTRUCTION INC            
                                                            14             37,561                  03/12/12     /  /      BERTUSSI'S CONTRACTING SERVICES     
                                                            15             31,728                  06/10/11   06/16/11    FOURMEN CONSTRUCTION INC            
                                                            15              8,184                  03/12/12   07/31/12    BERTUSSI'S CONTRACTING SERVICES     
                                                            16             15,200                  10/26/11   12/23/11    FOURMEN CONSTRUCTION INC            
                                                            17             19,619                  10/26/11     /  /      FOURMEN CONSTRUCTION INC            
                                                            18              5,000                  10/26/11   12/23/11    FOURMEN CONSTRUCTION INC            
                                                            19             35,000                  10/26/11   12/23/11    FOURMEN CONSTRUCTION INC            
                                                            2               9,240                  08/30/10   09/22/10    TALT ELECTRIC                       
                                                            2               2,044                  08/30/10   09/28/10    FOURMEN CONSTRUCTION INC            
                                                            2               7,255                  11/18/10   11/19/10    BERTUSSI'S CONTRACTING SERVICES     
                                                            2              47,694                  02/22/11   03/18/11    MENGLER CONTRACTING INC             
                                                            2               5,654                  09/16/11   11/23/11    INDUSTRIAL WINDOW CORPORATION       
                                                            20              6,727                  10/26/11   12/23/11    FOURMEN CONSTRUCTION INC            
                                                            21              8,073                  11/07/11   01/10/12    FOURMEN CONSTRUCTION INC            
                                                            22              7,007                  11/07/11   05/15/12    FOURMEN CONSTRUCTION INC            
                                                            23              6,000                  01/12/12   04/06/12    FOURMEN CONSTRUCTION INC            
                                                            3              19,196                  09/27/10   11/05/10    TALT ELECTRIC                       
                                                            3             -54,811                  09/27/10   11/05/10    FOURMEN CONSTRUCTION INC            
                                                            3              16,301                  11/18/10   11/19/10    BERTUSSI'S CONTRACTING SERVICES     
                                                            3               5,955                  02/22/11   03/18/11    MENGLER CONTRACTING INC             
                                                            3               5,290                  09/16/11   11/23/11    INDUSTRIAL WINDOW CORPORATION       
                                                            4              22,322                  09/27/10   11/04/10    FOURMEN CONSTRUCTION INC            
                                                            4             113,000                  11/18/10   11/19/10    TALT ELECTRIC                       
                                                            4              15,000                  12/01/10   12/28/10    BERTUSSI'S CONTRACTING SERVICES     
                                                            4               8,266                  09/16/11   11/23/11    INDUSTRIAL WINDOW CORPORATION       
                                                            4               2,023                  11/07/11   05/15/12    MENGLER CONTRACTING INC             
                                                            5               3,933                  09/27/10   11/04/10    FOURMEN CONSTRUCTION INC            
                                                            5               2,281                  12/01/10   12/28/10    BERTUSSI'S CONTRACTING SERVICES     
                                                            5               3,671                  06/10/11   06/16/11    TALT ELECTRIC                       
                                                            6               2,076                  09/27/10   11/04/10    FOURMEN CONSTRUCTION INC            
                                                            6              12,133                  02/22/11   03/18/11    BERTUSSI'S CONTRACTING SERVICES     
                                                            6              21,800                  11/07/11   10/24/12    TALT ELECTRIC                       
                                                            7              33,812                  11/05/10   11/12/10    FOURMEN CONSTRUCTION INC            
                                                            7              56,624                  02/22/11   03/18/11    BERTUSSI'S CONTRACTING SERVICES     
                                                            7              11,133                  11/07/11   05/15/12    TALT ELECTRIC                       
                                                            8              21,769                  11/05/10   11/12/10    FOURMEN CONSTRUCTION INC            
                                                            8               2,535                  02/22/11   03/18/11    BERTUSSI'S CONTRACTING SERVICES     
                                                            8               2,363                  11/07/11   05/15/12    TALT ELECTRIC                       
                                                            9              24,860                  11/05/10   11/12/10    FOURMEN CONSTRUCTION INC            
                                                            9              11,112                  06/10/11   06/16/11    BERTUSSI'S CONTRACTING SERVICES     
                                                            9              48,778                  11/07/11     /  /      TALT ELECTRIC                       
 
09-0355   Reconstruction               0-011-024  11/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             450,000                  09/27/10   11/05/10    NSC ABATEMENT SERVICES INC          
                                                            2               9,000                  03/28/11   04/22/11    NSC ABATEMENT SERVICES INC          
                                                            3               7,200                  09/30/11   12/29/11    NSC ABATEMENT SERVICES INC          
 
10-0364   Additions and Alterations    0-011-026  11/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0945   Reconstruction               0-011-027  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0511   Reconstruction               0-011-028  02/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1351   Reconstruction               0-011-029  06/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-7A         138,321                  06/14/23     /  /      ICON CONSTRUCTION                   
                                                            01-7B               0                  08/29/23     /  /      BERTUSSI CONTRACTING                
                                                            01-7C         -32,600                  06/07/23   01/02/24    VFR CONTRACTING                     
                                                            01-7f         -20,164                  06/07/23     /  /      PAGE CONTRACTING CORP               
 
22-1868FB Reconstruction               0-011-030  04/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Shed:
13-0311   New Construction             2-022-001  03/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gertrude Ave Bus Garage:
92-1068   Reconstruction               5-008-002  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1121   Reconstruction               5-008-003  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1272   Reconstruction               5-008-004  09/02/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mamaroneck Memorial Field Press Box:
18-1234   New Construction             7-025-001  03/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,668                  10/27/21   12/07/22    DeRosa Sports Const Inc             
                                                            2               3,044                  10/27/21   12/07/22    DeRosa Sports Const Inc             
                                                            3               3,300                  10/27/21   12/07/22    DeRosa Sports Const Inc             
                                                            4              17,162                  10/27/21   12/07/22    DeRosa Sports Const Inc             
                                                            5             381,000                  10/27/21   12/07/22    DeRosa Sports Const Inc             
                                                            6              14,891                  10/27/21   12/07/22    DeRosa Sports Const, Inc            
                                                            7              93,247                  10/27/21   12/07/22    DeRosa Sports Const Inc             
 

          Central School Tent (Purchased Shade:
22-0414FA Reconstruction               7-027-001  10/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mamaroneck Ave Sch Tent (Purchased):
22-0415FA Reconstruction               7-028-001  10/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Murray Ave Sch Tent (Purchased):
22-0416FA Reconstruction               7-029-001  10/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
02-0213   Reconstruction               7-999-001  01/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              47,746          47,746  03/05/04   09/24/04    CBS Whitcom Tech.                   
                                                            2             139,415         139,415  03/05/04   09/24/04    CBS Whitcom Tech.                   
                                                            3               5,054                  04/26/04   05/07/04    CBS Whitcom Tech.                   
                                                            4               4,000                  09/13/04     /  /      CBS Whitcom Tech.                   
                                                            5               9,000                  11/30/06   01/09/07    CBS Whitcom Technologies            
                                                            6              -2,527                  11/30/06   12/28/06    CBS Whitcom Technologies            
 

MOUNT PLEASANT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Hawthorne Elementary:
91-1476   Reconstruction               0-002-005  07/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0309   Reconstruction               0-002-006  10/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0454   Reconstruction               0-002-007  02/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1117   Additions and Alterations    0-002-008  08/06/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           2,200                  10/07/08   03/19/09    IACCARINO & SONS                    
                                                            ARC-003         1,000                  10/07/08     /  /      NETRIX,INC                          
                                                            ARH-001       -20,000                  04/24/07   07/30/07    Infinity Envrionmental              
                                                            ARH-002        20,000                  11/17/08   11/19/08    INFINITY ENVIRONMENTAL SERVICES     
                                                            ARH-003        22,420                  04/24/07   07/30/07    Infnity Environmental               
                                                            ARH-004        19,360                  04/24/07   07/30/07    Infinity Environmental              
                                                            ARH-005        21,645                  04/24/07   07/30/07    Infinity environmental              
                                                            ARH-006         4,250                  10/07/08     /  /      INFINITY ENVIRONMENTAL              
                                                            ARH-006         4,250                  11/17/08   12/31/08    INFINITY ENVIRONMENTAL SERVICES     
                                                            CCH-001       -20,000                  11/15/04   11/24/04    L. Simon                            
                                                            CCH-002        17,939                  11/17/08   11/19/08    L. SIMON CORP                       
                                                            CCH-003        20,808                  10/07/08   04/21/09    L. SIMON CORP.                      
                                                            CCH-004        15,987                  11/17/08   11/19/08    L. SIMON CORP                       
                                                            CCH-005        10,500                  11/17/08   11/19/08    L. SIMON CORP                       
                                                            CCH-006         3,500                  10/07/08   04/21/09    L. SIMON CORP.                      
                                                            ECH-001       -20,000                  11/15/04   11/24/04    Kevin Geberth                       
                                                            ECH-002       -15,000                  11/15/04   11/24/04    Kevin Geberth                       
                                                            ECH-003       -24,000                  11/15/04   11/24/04    Naber Electric                      
                                                            ECH-004         9,400                  11/15/04   11/24/04    Kevin Geberth                       
                                                            ECH-005        -8,250                  11/15/04   11/24/04    Kevin Geberth                       
                                                            ECH-006        11,000                  04/24/07   05/03/07    Naber Electric                      
                                                            ECH-007        17,367                  04/24/07   05/03/07    Naber Electric                      
                                                            ECH-008        12,084                  11/17/08   11/19/08    NABER ELECTRIC                      
                                                            ECH-009         3,740                  10/07/08     /  /      NABER ELECTRIC                      
                                                            ECH-010         5,669                  10/07/08     /  /      NABER ELECTRIC                      
                                                            ECH-011         7,450                  10/07/08   12/02/08    NABER ELECTRIC                      
                                                            ECH-011         7,450                  11/17/08     /  /      NABER ELECTRIC                      
                                                            FCH-001       -20,000                  04/24/07   07/30/07    Elite Floors                        
                                                            FCH-002       -10,000                  04/24/07   07/30/07    Elite Floors                        
                                                            FCH-003         6,450                  04/24/07   07/30/07    Elite Floors                        
                                                            FCH-004         1,830                  10/07/08   10/30/08    ELITE FLOORS                        
                                                            FCH-005         1,845                  10/07/08     /  /      ELITIE FLOORS                       
                                                            FCH-006         1,850                  10/07/08     /  /      ELITIE FLOORS                       
                                                            GCC-001      -100,000                  01/12/05   02/08/05    Subolo Contracting Service          
                                                            GCG-014        18,070                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH 010         8,500                  04/24/07   07/30/07    Piazza Brothers                     
                                                            GCH-001      -100,000                  11/15/04   11/24/04    Piazza Brothers                     
                                                            GCH-001      -100,000                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-002        12,800                  04/24/07   07/30/07    Piazza Brothers                     
                                                            GCH-002        12,800                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-003         8,500                  04/24/07   07/30/07    Piazza Brothers                     
                                                            GCH-003         8,500                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-004        18,963                  04/24/07   07/30/07    Piazza Brothers                     
                                                            GCH-006         9,500                  04/24/07   07/30/07    PIazza Brothers                     
                                                            GCH-006         9,500                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-007         6,870                  04/24/07   07/30/07    Piazza brothers                     
                                                            GCH-007         6,870                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-008        16,184                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-009       -10,000                  04/24/07   07/30/07    Piazza Brothers                     
                                                            GCH-009       -10,000                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-010         8,500                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-011         7,500                  04/24/07   07/30/07    Piazza Brothers                     
                                                            GCH-011         7,500                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-012        14,123                  04/24/07   07/30/07    Piazza Brothers                     
                                                            GCH-012        14,123                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-013        17,792                  04/24/07   07/30/07    Piazza brothers                     
                                                            GCH-013        17,792                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-014        18,071                  10/07/08   02/19/09    PIAZZA BROTHERS                     
                                                            GCH-015        18,666                  10/07/08   11/28/08    PIAZZA BROTHERS                     
                                                            GCH-016        18,900                  10/07/08   11/06/08    PIAZZA BROTHERS                     
                                                            GCH-016        18,900                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-017        12,600                  10/07/08   10/30/08    PIAZZA BROTHERS                     
                                                            GCH-017        12,600                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-018         6,677                  10/07/08   10/30/08    PIAZZA BROTHERS                     
                                                            GCH-018         6,677                  11/17/08   11/19/08    PIAZZA BROTHERS                     
                                                            GCH-019         9,714                  10/07/08   10/30/08    PIAZZA BROTHERS                     
                                                            GCH-020         2,200                  10/07/08   04/21/09    PIAZZA BROTHERS                     
                                                            GCH-05         14,237                  06/15/09     /  /      PIAZZA BROTHERS                     
                                                            GCh-008        16,184                  04/24/07   07/30/07    Piazza Brothers                     
                                                            LCH-001        -5,000                  11/15/04   11/24/04    JS McHugh                           
                                                            MCC-001       -50,000                  01/12/05   02/08/05    Richards Conditioning Corp          
                                                            MCC-003         5,854                  10/07/08   01/27/09    RICHARDS CORP.                      
                                                            MCH-001       -50,000                  04/24/07   07/30/07    Clean Air Quality                   
                                                            MCH-003        16,591                  04/24/07   07/30/07    Clean Air Quality                   
                                                            MCH-004        15,226                  04/24/07   07/30/07    Clean Air Quality                   
                                                            MCH-005         5,242                  11/17/08   11/19/08    CLEAN AIR QUALITY SERVICES          
                                                            MCH-006        52,999                  11/17/08   11/19/08    CLEAN AIR QUALITY SERVICES          
                                                            MCH-007        83,250                  11/17/08   11/19/08    CLEAN AIR QUALITY SERVICES          
                                                            MCH-008        60,650                  11/17/08   12/02/08    CLEAN AIR QUALITY SERVICES          
                                                            MCH-009         8,598                  11/17/08   12/02/08    CLEAN AIR QUALITY SERVICES          
                                                            PCC-001       -15,000                  01/12/05   02/08/05    Beneway Plumbing Inc                
                                                            PCH 005        17,283                  04/24/07     /  /      MJ Plumbing                         
                                                            PCH-001       -15,000                  11/15/04   11/24/04    MJ Plumbing                         
                                                            PCH-002         3,200                  11/15/04   11/24/04    MJ Plumbing                         
                                                            PCH-003         2,090                  04/24/07   05/03/07    MJ Plumbing                         
                                                            PCH-004        10,038                  04/24/07   01/15/08    MJ Plumbing                         
                                                            PCH-006        20,730                  04/24/07   01/15/08    MJ Plumbing                         
                                                            PCH-007       -11,047                  11/17/08   12/31/08    MJ PLUMBING                         
                                                            PCH-008         4,700                  10/07/08     /  /      MJ PLUMBING                         
                                                            RCH-001       -10,000                  01/12/05   02/08/05    Greg Manchisi                       
                                                            RCH-002        10,015                  12/11/06   11/19/08    Agras                               
                                                            RCH-003         2,279                  04/24/07   07/30/07    Agras                               
                                                            RCH-004         6,320                  12/11/06   01/19/07    AGras                               
                                                            SCH-001       -20,000                  11/15/04   11/19/08    STS Steel                           
                                                            SCH-001       -20,000                  11/17/08     /  /      STS STEEL                           
                                                            SCH-002       -18,000                  11/15/04   11/24/04    Daniel Thomas                       
                                                            SCH-002       -18,000                  11/17/08   11/19/08    STS STEEL                           
                                                            SCH-003        10,600                  11/15/04   11/24/04    Daniel Thomas                       
                                                            SCH-003        10,600                  11/17/08   11/19/08    STS STEEL                           
                                                            SCH-004        24,300                  04/24/07   07/30/07    STS Steel                           
                                                            SCH-005        16,217                  04/24/07   07/30/07    STS Steel                           
                                                            SCH-006         3,600                  04/24/07   07/30/07    STS Steel                           
                                                            SCH-007        12,736                  11/17/08   11/19/08    STS STEEL                           
                                                            SWC-001       -54,000                  01/12/05   02/08/05    Rock Island Contractors             
                                                            SWH-002       -82,000                  06/15/09   08/10/09    SENTRALE CONSTRUCTION CORP          
                                                            SWH-003       -11,706                  06/15/09   08/10/09    SENTRALE CONSTRUCTION CORP          
                                                            SWH-004       -57,000                  06/15/09   08/10/09    SENTRALE CONSTRUCTION CORP          
                                                            SWH-005      -126,294                  06/15/09   08/10/09    SENTRALE CONSTRUCTION CORP          
                                                            SWH-006         7,428                  04/24/07   07/30/07    Sentrale Construction               
                                                            SWH-007        18,920                  04/24/07   07/30/07    Sentrale Construction               
                                                            SWH-008        10,000                  04/24/07   07/30/07    Sentrale Construction               
                                                            SWH-009        12,581                  04/24/07   07/30/07    Sentrale Construction               
                                                            SWH-010        12,025                  04/24/07   07/30/07    Sentrale Construction               
                                                            SWH-011         5,329                  10/07/08   10/23/08    SENTRAL CONSTRUCTION CORP           
                                                            SWH-012        11,756                  10/07/08   01/30/09    SENTRAL CONSTRUCTION CORP           
                                                            SWH-013         6,251                  10/07/08   04/21/09    SENTRALE CONSTRUCTION CORP.         
                                                            SWH-014         2,281                  11/17/08   11/19/08    SENTRALE CONSTRUCTION CORP          
                                                            WCC-001       -40,000                  01/12/05   02/08/05    Jim Weber and Associates            
                                                            WCH-001       -40,000                  11/15/04   11/24/04    Anthony Lisincchia                  
                                                            WCH-002         4,085                  06/15/09     /  /      FORNO ENTERPRISES                   
                                                            WCH-003         1,940                  10/07/08     /  /      FORNO ENTERPRISES                   
 
07-2285   Reconstruction               0-002-009  05/20/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -36,296                  03/09/11   03/28/11    TANK SPECIALISTS PLUS               
                                                            2              11,665                  03/09/11   03/28/11    TANK SPECIALISTS PLUS               
 
15-1873   Reconstruction               0-002-010  03/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1            -13,496                  09/10/19   09/24/19    CAPITAL RENOVATION CORP.            
 
19-0485   Reconstruction               0-002-011  02/04/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Columbus Elementary School:
92-0455   Reconstruction               0-004-002  02/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1555   Additions and Alterations    0-004-003  07/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1617   Reconstruction               0-004-004  06/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0028   Reconstruction               0-004-006  07/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0946   Reconstruction               0-004-007  05/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002         -2,500                  04/07/16   05/19/16    Northeast Environmental             
 
14-0802   Reconstruction               0-004-008  12/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1510   Reconstruction               0-004-009  08/03/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1             -2,275                  03/20/18   03/28/18    A.G.V. Electrical Contracting LLC   
                                                            H1             32,922                  09/20/17   10/12/17    Clean Air Quality Service, Inc.     
                                                            H2             68,313                  08/27/18   09/12/18    CLEAN AIR QUALITY SERVICE INC       
                                                            H3           -100,000                  08/27/18   09/12/18    CLEAN AIR QUALITY SERVICE INC       
                                                            P-1           -15,000                  07/30/18     /  /      CLEAN AIR QUALITY SERVICE INC       
 
15-1482   Reconstruction               0-004-010  09/21/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R1            -40,000                  03/20/18   03/22/18    W.B. Contracting Corp.              
 
17-0133   Reconstruction               0-004-011  04/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-CO-01       27,390                  12/10/18   01/22/19    J&M HEATING & AIR CONDITIONING,INC. 
                                                            MCCO02        -13,656                  02/28/19   03/15/19    J&M HEATING & AIR                   
                                                            SC-CO-01       10,000                  12/10/18   01/23/19    R.PUGNI & SON, INC.                 
                                                            SC-CO-02       34,521                  12/10/18   01/23/19    R. PUGMI & SON, INC.                
                                                            SC-CO-03        6,467                  12/10/18   01/23/19    R. PUGNI & SON, INC.                
 

          West Lake High School:
91-1477   Reconstruction               0-005-004  07/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0456   Reconstruction               0-005-005  02/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0192   Reconstruction               0-005-007  10/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0842   Additions and Alterations    0-005-009  03/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-002          5,600                  11/17/08   12/02/08    NSC ABATEMENT SERVICES, INC.        
                                                            AC-003         -1,925                  11/17/08   11/19/08    NSC ABATEMENT SERVICES, INC.        
                                                            ACS-001         3,039                  12/11/06   01/30/07    ACS Systems Associates              
                                                            ACS-002         1,960                  12/11/06   01/30/07    ACS Systems Associate               
                                                            EC-001          1,520                  11/17/08   11/19/08    NABER ELECTRIC                      
                                                            EC-002          5,657                  11/17/08   11/19/08    NABER ELECTRIC                      
                                                            ECWL-003        1,096                  11/17/08   12/31/08    NABER ELECTRIC                      
                                                            ECWL-004        3,177                  11/17/08   12/31/08    NABER ELECTRIC                      
                                                            ECWL-005       -1,932                  11/17/08     /  /      NABER ELECTRIC                      
                                                            ECWL-006        8,794                  11/17/08   12/31/08    NABER ELECTRIC                      
                                                            ECWL-007        1,398                  11/17/08   12/31/08    NABER ELECTRIC                      
                                                            ECWL-008        2,204                  11/17/08   12/31/08    NABER ELECTRIC                      
                                                            ECWL-009       26,000                  11/17/08   12/02/08    NABER ELECTRIC                      
                                                            GC-002          2,537                  11/17/08   11/19/08    MACE CONTRACTING CORPORATION        
                                                            GC-005          1,208                  12/11/06   01/30/07    Mace Contracting                    
                                                            GC-006         -1,521                  12/11/06   01/30/07    Mace Contracing                     
                                                            GCWL-008          750                  12/11/06     /  /      Mace Contracting                    
                                                            GCWL007         6,044                  12/11/06   01/30/07    Mace Contracting                    
                                                            PCWL-005          205                  11/17/08   12/31/08    GRUPPUSO PLUMBING CORPORATION       
                                                            PCWL-006        2,014                  11/17/08   12/02/08    GRUPPUSO PLUMBING CORPORATION       
                                                            PCWL-007        1,939                  11/17/08   12/31/08    GRUPPUSO PLUMBING CORPORATION       
                                                            PCWL-008       21,558                  11/17/08   12/02/08    GRUPPUSO PLUMBING CORPORATION       
                                                            PCWL-010       -1,949                  11/17/08   12/31/08    GRUPPUSO PLUMBING CORPORATION       
                                                            SW-001          3,400                  11/17/08   11/19/08    BRADHURST SITE CONSTRUCTION CORP.   
                                                            SW-002         58,000                  11/17/08   12/02/08    BRADHURST SITE CONSTRUCTION         
                                                            SW-003         29,244                  11/17/08   12/02/08    BRADHURST SITE CONSTRUCTION CORP.   
                                                            SW-004         13,750                  12/11/06   07/29/10    Bradhurst Site Construction         
                                                            SW-005         14,376                  12/11/06   07/29/10    Bradhurst Site Construction         
                                                            SW-006         14,160                  12/11/06   07/29/10    Bradhurst Site Construction         
                                                            SW-008         77,000                  12/11/06   07/29/10    Bradhurst Site Construction         
                                                            WHS-002        -7,500                  06/28/08   11/19/08    NETRIX INC.                         
                                                            WIN-002        25,000                  11/17/08   11/19/08    ARCHITECURAL WINDOW                 
                                                            WIN-003        13,786                  11/17/08   11/19/08    ARCHITECTURAL WINDOW                
                                                            WIn003         13,786                  12/11/06   01/30/07    Architectural Window                
                                                            WL-001            973                  11/17/08   12/31/08    GRUPPUSO PLUMBING CORPORATION       
                                                            WL-002         18,897                  11/17/08   12/02/08    GRUPPUSO PLUMBING CORPORATION       
                                                            WL-003         -6,685                  11/17/08   12/31/08    GRUPPUSO PLUMBING CORPORATION       
                                                            Win-002        25,000                  12/11/06   01/30/07    Architectural Window                
 
02-1887   Reconstruction               0-005-010  06/07/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            WHS-001         3,100                  11/17/08   11/19/08    NETRIX INC.                         
 
11-0029   Reconstruction               0-005-012  07/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0947   Reconstruction               0-005-013  05/12/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0219   Reconstruction               0-005-014  09/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1268   Reconstruction               0-005-015  03/23/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0062   Reconstruction               0-005-016  05/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01           9,689                  06/06/22   05/01/23    Talt Elec                           
                                                            EC-02           9,413                  06/06/22   05/01/23    Talt Elec                           
                                                            EC-03          36,000                  06/06/22   05/01/23    Talt Elec                           
                                                            EC-04          -4,581                  06/06/22   04/10/23    Talt Elec                           
                                                            EC-05         -36,980                  06/06/22   04/10/23    Talt Elec                           
                                                            EC-06          -3,995                  06/06/22     /  /      Talt Elec                           
                                                            EC-07          -1,856                  06/06/22   04/10/23    Talt Elec                           
                                                            GC-01          -2,820                  06/06/22     /  /      GTS Const                           
                                                            GC-02           2,500                  06/06/22   05/15/23    GTS Const                           
                                                            GC-03         -17,785                  06/06/22     /  /      GTS Const                           
                                                            MC-01          -8,403                  06/06/22     /  /      Pearl River Plumb,Heat &Elec Inc    
                                                            MC-02          -6,160                  06/06/22   05/01/23    Pearl River Plumb,Heat&Elec Inc     
                                                            PC-01             163                  06/06/22   05/01/23    S&L Plumb&Heat                      
                                                            RC-01          -4,105                  06/06/22   05/08/23    Barrett Roofs Inc                   
                                                            RC-02         -21,280                  06/06/22     /  /      Barrett Roofs Inc                   
 
18-1226   Reconstruction               0-005-017  03/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          3,995                  07/07/22   04/04/23    D&M Elec Contrg                     
                                                            EC-003        -12,712                  07/07/22   04/04/23    D&M Elec Contrg Inc                 
                                                            EC-01          15,007                  07/07/22   04/04/23    D&M Elec Contrg                     
                                                            SC-03          30,565                  07/07/22   05/17/23    Nicky Diggs Excavtion               
                                                            SC-04          34,898                  07/07/22   05/17/23    Nicky Diggs Excavation              
                                                            SC-05          54,254                  07/07/22   05/17/23    Nicky Diggs Excavation              
                                                            SC-06          16,994                  07/07/22   05/17/23    Nicky Diggs Excavation              
                                                            SC-07           8,300                  07/07/22   05/17/23    Nicky Diggs Excavation              
                                                            SC-08           9,882                  07/07/22   05/17/23    Nicky Diggs Excavation              
                                                            SC-09           8,150                  07/07/22   05/17/23    Nicky Diggs Excavation              
 
19-1763   Reconstruction               0-005-018  07/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1756   Reconstruction               0-005-019  07/01/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,123                  01/06/21   04/21/21    JENNINGS CO.,INC.                   
 
20-0187   Reconstruction               0-005-020  11/23/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001          -11,000                  11/14/22   07/27/23    CLEAN AIR QUALITY SERVICE INC       
                                                            0001          -28,270                  11/14/22   07/27/23    J&M HEATING & AIR                   
                                                            0001           12,000                  11/14/22   07/27/23    VINCO BUILDERS LLC                  
                                                            0001            4,196                  11/14/22   07/27/23    ALLSTATE ELECTRICAL GROUP           
                                                            0002           -1,687                  11/14/22   07/27/23    VINCO BUILDERS LLC                  
                                                            0003            7,378                  11/14/23   07/27/23    ALLSTATE ELECTRICAL GROUP           
                                                            0004            4,662                  11/14/23   07/27/23    ALLSTATE ELECTRICAL GROUP           
                                                            0005            5,347                  11/14/22   07/27/23    ALLSTATE ELECTRICAL GROUP           
                                                            0006            5,000                  11/14/22   08/08/23    ALLSTATE ELECTRICAL GROUP           
                                                            0007            4,008                  11/14/22   12/13/23    ALLSTATE ELECTRICAL GROUP           
                                                            0008             -787                  11/14/22   08/08/23    ALLSTATE ELECTRICAL GROUP           
                                                            2               5,692                  11/14/22   12/13/23    ALLSTATE ELECTRICAL GROUP           
                                                            3               2,275                  11/14/22   12/13/23    VINCO BUILDERS LLC                  
 
21-1847   Reconstruction               0-005-022  10/07/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-2063   Reconstruction               0-005-023  09/29/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001           70,888                  04/25/23     /  /      NICKY DIGGS EXCAVATION              
                                                            1                   0                  04/25/23   12/27/23    GLOBAL ELECTRICAL CONTRACTING       
 
22-1104   Reconstruction               0-005-025  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Lake Middle School:
91-1478   Reconstruction               0-006-002  07/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0310   Reconstruction               0-006-003  10/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0457   Reconstruction               0-006-004  02/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0193   Reconstruction               0-006-005  10/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0843   Additions and Alterations    0-006-006  04/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB001          5,900                  11/17/08   11/19/08    NSC ABATEMENT SERVICES, INC.        
                                                            ECWL-003        1,096                  11/17/08   12/31/08    NABER ELECTRIC                      
                                                            GC-001          6,500                  11/17/08   11/19/08    MACE CONTRACTING CORPORATION        
                                                            GC-003         16,361                  11/17/08   11/19/08    MACE CONTRACTING CORPORATION        
                                                            GC-004          6,685                  11/17/08   11/19/08    MACE CONTRACTING CORPORATION        
                                                            PCWL-004          303                  11/17/08   12/31/08    GRUPPUSO PLUMBING CORPORATION       
                                                            PCWL-009        4,865                  11/17/08   12/02/08    GRUPPUSO PLUMBING CORPORATION       
 
02-1888   Reconstruction               0-006-007  06/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2284   Reconstruction               0-006-008  12/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-AP01       125,000                  10/29/09   12/21/09    ABBOTT & PRICE INCORPORATED         
                                                            CO-AP02         4,772                  12/24/09   02/05/10    ABBOTT & PRICE INCORPORATED         
                                                            CO-AP03         1,413                  12/24/09   02/05/10    ABBOTT & PRICE INCORPORATED         
                                                            CO-AP04         3,005                  12/24/09   02/05/10    ABBOTT & PRICE INCORPORATED         
                                                            CO-AP05         5,177                  12/24/09   02/05/10    ABBOTT & PRICE INCORPORATED         
                                                            CO-HE01           671                  10/23/09   12/21/09    HEALY ELECTRICAL CONTRACTING        
                                                            CO-HE02           724                  12/24/09   02/05/10    HEALY ELECTRIC CONTRACTING          
                                                            CO-HE03         1,395                  12/24/09   02/05/10    HEALY ELECTRIC CONTRACTING          
 
13-0948   Reconstruction               0-006-010  05/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         19,674                  12/26/14   01/12/15    Northeast Environmental             
 
16-0543   Reconstruction               0-006-011  04/05/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01 REVIS       14,273                  03/02/21   04/20/21    KNEELAND CONSTRUCTION CORP.         
 
16-1269   Reconstruction               0-006-012  03/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02         -10,377                  04/25/22     /  /      More Roofing  Inc                   
                                                            GC-03         -44,895                  04/25/22     /  /      More Roof Inc                       
                                                            GC-1           -2,343                  04/25/22   05/09/23    More Roofg Inc                      
 
18-0476   Reconstruction               0-006-013  03/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01          32,000                  07/07/22   05/17/23    Nicky Diggs Excavation              
                                                            SC-02           2,850                  07/07/22   05/17/23    Micky Diggs Excavation              
                                                            SC-10          23,000                  07/07/22   05/17/23    Nicky Diggs Excavation              
 
21-2064   Reconstruction               0-006-014  09/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1105   Reconstruction               0-006-015  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maint. Garage:
21-0354   New Construction             3-012-001  01/19/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,514                  03/30/23   12/21/23    ZN CONSTRUCTION                     
                                                            1_2           -18,520                  04/25/23   12/27/23    J & M HEATING AND AIR               
                                                            1_3            -9,972                  04/25/23   12/27/23    ACORN ELECTRICAL CONTRACTORS        
                                                            1_4           -12,900                  04/25/23   12/27/23    VFR CONTRACTING                     
                                                            2_1           -17,035                  03/30/23     /  /      ZN CONSTRUCTION                     
 

          XXNew Press Box @ HS -DoesNotExist:
11-1386   New Construction             7-010-001  10/10/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box:
21-2065   New Construction             7-025-001  09/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
98-0590   Reconstruction               7-999-001  02/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1097   Reconstruction               7-999-002  04/12/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  09/28/12   02/11/13    SECURITY SPECIALISTS                
                                                            002            13,686                  09/28/12   02/11/13    SECURITY SPECIALISTS                
                                                            003             7,989                  10/29/12   02/25/13    SECURITY SPECIALISTS                
                                                            004             1,033                  02/19/13   05/08/13    SECURITY SPECIALISTS                
 

POCANTICO HILLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Pocantico Hills Central:
91-1514   Reconstruction               0-001-005  07/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0775   Reconstruction               0-001-006  02/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0967   Reconstruction               0-001-007  03/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0968   Reconstruction               0-001-008  03/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1116   Reconstruction               0-001-009  03/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1858   Reconstruction               0-001-011  07/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1482   Reconstruction               0-001-014  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1225   Reconstruction               0-001-015  05/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1371   Reconstruction               0-001-016  06/19/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1441   Reconstruction               0-001-017  07/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0164   Reconstruction               0-001-018  08/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1564   Reconstruction               0-001-019  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0237   Reconstruction               0-001-020  09/11/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0534   Reconstruction               0-001-021  12/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0950   Reconstruction               0-001-022  03/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0240   Reconstruction               0-001-025  11/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1306   Reconstruction               0-001-026  09/18/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           4,623                  06/08/10   08/04/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-02           1,145                  06/08/10   08/04/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-03           2,090                  04/12/10   05/28/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-04           1,353                  04/12/10   05/28/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-05           1,954                  04/12/10   05/28/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-06           2,995                  06/15/10   08/04/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-07             631                  06/15/10   08/04/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-08           5,223                  06/15/10   08/04/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-09            -730                  06/15/10   08/04/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-09            -730                  08/10/10   09/07/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-10           2,031                  06/25/10   08/04/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-11           3,371                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-12           4,675                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-13           7,894                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-14             889                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-15           2,369                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-16           1,759                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-17           1,568                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-18          47,018                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-19          47,018                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-20         108,247                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-21         117,759                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-22         142,897                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-23           4,700                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-24          14,250                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-25             550                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-26          20,800                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-27           4,000                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-28          65,900                  08/10/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-29           9,500                  09/02/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-30           4,500                  09/02/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-31          19,000                  09/02/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-32          19,995                  09/02/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-33          21,000                  09/02/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-34           1,750                  09/02/10   09/24/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-35           1,683                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-36           1,735                  09/24/10   11/17/10    FOREMOST ELECTRIC CORPORATION       
                                                            EC-37           7,670                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-38           9,975                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-39           3,000                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-40          13,500                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-41          23,350                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-42          17,850                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-43           1,300                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-44           1,247                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-45             864                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-46           2,793                  03/18/11   11/27/12    FOREMOST ELECTRIC CORPORATION       
                                                            EC-47           4,350                  04/20/11   05/13/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-48           2,500                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-49           2,480                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-50           4,940                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-51           8,950                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-52          37,650                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-53           4,000                  03/18/11   12/13/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-54             800                  02/15/11   03/02/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-55          10,742                  03/18/11   05/27/14    FOREMOST ELECTRIC CORPORATION       
                                                            EC-56          11,072                  03/18/11   12/13/11    FOREMOST ELECTRIC CORPORATION       
                                                            EC-57           1,590                  03/18/11   10/25/13    FOREMOST ELECTRIC CORPORATION       
                                                            EC-58          12,500                  09/01/11   01/23/14    FOREMOST ELECTRIC CORPORATION       
                                                            EC-59          15,700                  10/14/11   01/23/14    FOREMOST ELECTRIC CORPORATION       
                                                            EC-60          48,800                  03/26/13   06/17/13    FOREMOST ELECTRIC CORPORATION       
                                                            GC-01           4,796                  06/08/10   08/04/10    SISCA NORTHEAST INC                 
                                                            GC-02           1,856                  06/08/10   08/04/10    SISCA NORTHEAST INC                 
                                                            GC-03           2,030                  04/12/10   05/28/10    SISCA NORTHEAST INC                 
                                                            GC-04           1,759                  04/12/10   05/28/10    SISCA NORTHEAST INC                 
                                                            GC-05            -600                  04/12/10   05/28/10    SISCA NORTHEAST INC                 
                                                            GC-06           9,000                  04/12/10   05/28/10    SISCA NORTHEAST INC                 
                                                            GC-07           1,980                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-08         129,030                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-09           1,000                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-10           6,500                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-11          -7,690                  08/18/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-12           7,053                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-13           1,870                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-14           6,000                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-15           4,000                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-16           3,785                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-17           5,946                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-18           3,122                  08/10/10   09/23/10    SISCA NORTHEAST INC                 
                                                            GC-19           2,573                  08/10/10   09/07/10    SISCA NORTHEAST INC                 
                                                            GC-20           3,000                  08/10/10   09/07/10    SISCA NORTHEAST INC                 
                                                            GC-21          29,000                  08/10/10   09/28/10    SISCA NORTHEAST INC                 
                                                            GC-22          10,000                  08/10/10   09/28/10    SISCA NORTHEAST INC                 
                                                            GC-23           8,008                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-24          10,165                  02/15/11   03/02/11    SISCA NORTHEAST INC                 
                                                            GC-25           4,307                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-26           6,573                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-27           1,538                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-28           7,714                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-29           6,171                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-30           3,927                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-31           9,064                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-32           9,600                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-33          30,200                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-34           2,000                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-35           6,719                  09/02/10   09/24/10    SISCA NORTHEAST INC                 
                                                            GC-37          49,000                  03/18/11   09/21/11    SISCA NORTHEAST INC                 
                                                            GC-38           1,514                  03/18/11   09/21/11    SISCA NORTHEAST INC                 
                                                            GC-39           1,948                  03/18/11   09/21/11    SISCA NORTHEAST INC                 
                                                            GC-40             969                  03/18/11   09/21/11    SISCA NORTHEAST INC                 
                                                            GC-41           2,208                  03/18/11   09/21/11    SISCA NORTHEAST INC                 
                                                            GC-42          -4,403                  09/01/11   09/21/11    SISCA NORTHEAST INC                 
                                                            GC-43          19,800                  09/01/11   09/21/11    SISCA NORTHEAST INC                 
                                                            GC-44         -15,547                  03/26/13   10/23/13    SISCA NORTHEAST INC                 
                                                            HC-01           1,743                  08/10/10   09/28/10    MENGLER MECHANICAL INC              
                                                            HC-02           6,223                  08/10/10   09/28/10    MENGLER MECHANICAL INC              
                                                            HC-03          63,500                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            HC-04             900                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            HC-05             650                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            HC-06           8,600                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            HC-07           4,800                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            HC-08           1,100                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            HC-09             825                  09/02/10   09/24/10    MENGLER MECHANICAL INC              
                                                            HC-10          27,958                  02/15/11   03/02/11    MENGLER MECHANICAL INC