Change Order Status - Tompkins


DRYDEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-03-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Cassavant Elementary:
93-0353   Reconstruction               0-001-004  10/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0268   Reconstruction               0-001-006  12/21/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-0041        2,746                  10/27/05   11/08/05    Andrew mancini Associates           
                                                            100-010         3,276                  03/02/06   06/06/06    Andrew Mancini Associates           
                                                            100-016        14,562                  02/01/06   04/24/06    Andrew mancini Associates           
                                                            100-017         2,717                  02/01/06   04/21/06    Andrew mancini Associates           
                                                            100-020           692                  03/02/06   06/06/06    Andrew Mancini Associates           
                                                            100-026         9,480                  05/04/06   01/25/08    Andrew mancini Associate            
                                                            100-028         5,105                  09/29/06   10/24/06    Andrew mancini Associates           
                                                            100-034         6,286                  06/14/06   07/14/06    Andrew Mancini                      
                                                            100-035         4,696                  06/14/06   07/14/06    Andrew Mancini Associates           
                                                            100-041         1,076                  09/29/06   10/24/06    Andrew Mancini Associates           
                                                            100-045         4,118                  08/29/06   10/13/06    Andrew Mancini                      
                                                            100-050         6,556                  03/02/07   03/13/07    Andrew Mancini                      
                                                            100-062         1,496                  06/04/07   06/20/07    Andrew mancini Associates           
                                                            100-064        17,844                  01/10/08     /  /      Andrew R. Mancini Associates        
                                                            100-065        18,108                  01/10/08   01/25/08    Andrew R. Mancini Associates        
                                                            100-066        26,521                  01/10/08   01/25/08    Andrew R. Mancini Associates        
                                                            100-067        54,307                  01/10/08   01/25/08    Andrew R. Mancini Associates        
                                                            100-069         1,041                  12/18/07   02/23/08    ANDREW R. MANCINI ASSOCIATES        
                                                            100-072         3,643                  02/01/08   08/04/08    ANDREW R. MANCINI ASSOCIATES, INC   
                                                            100-073         4,885                  07/09/08   12/03/08    Andrew R. Mancini Associates,Inc    
                                                            101-001           518                  03/02/06   06/06/06    Pag Enterprises                     
                                                            102-002         1,470                  03/02/06   06/06/06    Edward Schalk and Son               
                                                            102-009           666                  02/01/06   04/24/06    Edward Schalk                       
                                                            102-014           783                  01/10/08   01/25/08    Edward Schalk & Son                 
                                                            104-004         1,795                  03/02/06   06/06/06    John Cook painting                  
                                                            104-006           724                  03/02/06   06/06/06    John Cook Painting                  
                                                            104-007           763                  05/04/06   01/25/08    John Cook Painting                  
                                                            104-011         4,847                  01/10/08   01/25/08    John H. Cook Painting               
                                                            104-017         1,000                  11/14/06   12/27/06    John Cook                           
                                                            104-019         1,221                  02/07/07   02/22/07    John Cook Painting                  
                                                            106-003         9,879                  12/01/05   05/24/06    JAMES L. LEWIS, INC.                
                                                            106-015         3,117                  06/06/06   06/23/06    James Lewis                         
                                                            106-016         8,547                  06/06/06   01/25/08    James Lewis                         
                                                            106-017             0                  06/06/06   11/22/06    James Lewis                         
                                                            106-022         1,794                  09/18/06   12/18/06    James Lewis                         
                                                            107-004         3,683                  01/03/06   05/26/06    John Contro and Son                 
                                                            107-008         4,077                  03/02/06   03/14/06    John Contro and Sons                
                                                            108-002          -237                  09/29/06   10/19/06    Allied Fire Protection              
                                                            109-001         3,685                  03/22/06   05/25/06    John mills Electric                 
                                                            109-003         5,348                  03/22/06   05/25/06    John Mills electric                 
                                                            109-004         7,514                  03/22/06   05/24/06    John mills Electric                 
                                                            109-009         5,206                  06/06/06   06/23/06    john mills electric                 
                                                            109-011         4,098                  07/05/06   11/30/06    John Mills Electric                 
                                                            109-012         2,001                  08/08/06   12/18/06    John Mills Electric                 
                                                            109-019         3,690                  02/07/07   03/12/07    John Mills Electric                 
                                                            109-021          -984                  03/05/07   03/15/08    John Mills Electric,Incorp.         
                                                            109-023         9,786                  02/01/08     /  /      JOHN MILLLS ELECTRIC, INC           
                                                            109-023         9,786                  02/01/08   04/04/08    JOHN MILLS ELECTRIC, INC.           
                                                            109-024         3,527                  02/01/08   08/07/08    JOHN MILLS ELECTRIC, INC            
                                                            109-026         1,888                  02/01/08   04/04/08    JOHN MILLS ELECTRIC, INC            
                                                            109-028        -4,016                  03/05/08     /  /      John Mills Electric, Incorp.        
 
11-0884   Reconstruction               0-001-007  06/29/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3              382                  12/10/13   02/14/14    Diekow Electric, Inc.               
                                                            ID-2            1,807                  02/17/15   02/18/15    Tri County Securty Systems, Inc.    
 
18-0116   Reconstruction               0-001-008  12/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401B-001       28,312                  11/09/20   02/11/21    FAHS CONSTRUCTION GROUP             
                                                            401B-004       10,975                  12/31/20   03/16/21    FAHS CONSTRUCTION GROUP             
                                                            402B-002          322                  12/31/20   02/26/21    PETCOSKY PLUMBING & HEATING, INC.   
                                                            403B-001          504                  12/31/20   02/26/21    PETCOSKY PLUMBING & HEATING, INC.   
                                                            403B-002          921                  12/31/20   02/26/21    PETCOSKY PLUMBBING & HEATING, INC.  
                                                            403B-003        1,989                  12/31/20   02/26/21    PETCOSKY PLUMBING & HEATING, INC.   
                                                            404B-001       10,403                  12/31/20   02/26/21    SCHULER-HAAS ELECTRICAL CONTRACTORS 
                                                            404B-003        6,027                  12/31/20   02/26/21    SCHULER-HAAS ELECTRICAL CONTRACTORS 
 
17-0642   Reconstruction               0-001-009  02/23/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0391   Reconstruction               0-001-010  12/16/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          7,000                  04/12/21   05/24/21    FAHS CONSTRUCTION GROUP, INC.       
 
21-0323   Reconstruction               0-001-011  11/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1087SC Visual Structural Inspection 0-001-SC1  04/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dryden Elementary:
93-0354   Reconstruction               0-003-010  10/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0498   Additions and Alterations    0-003-011  02/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0567   Reconstruction               0-003-012  01/11/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0269   Reconstruction               0-003-015  12/21/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-001         9,590                  01/10/08   04/07/08    Andrew R. Mancini                   
                                                            100-002        11,779                  12/05/05   01/25/08    Andrew mancini Associates           
                                                            100-003        11,439                  11/10/05   12/14/06    ANDREW R. MANCINI ASSOCIATES, INC.  
                                                            100-005        25,336                  01/10/08   01/25/08    ANDREW R. MANCINI ASSOCIATES, INC.  
                                                            100-006         4,842                  03/02/06   06/06/06    Andrew mancini associates           
                                                            100-007         7,335                  03/02/06   06/06/06    Andrew Mancini Associates           
                                                            100-008        16,769                  03/13/06   06/02/06    Andrew mancini Associates           
                                                            100-011        17,406                  02/01/06   04/21/06    Andrew Mancini Associates           
                                                            100-012         7,160                  01/18/06   06/09/06    Andrew Mancini Associates           
                                                            100-013         5,361                  01/18/06   06/09/06    Andrew Mancini                      
                                                            100-014         8,087                  03/02/06   06/06/06    Andrew Mancini Associates           
                                                            100-018         2,886                  02/01/06   04/24/06    Andrew Mancini Associates           
                                                            100-019         7,136                  02/09/06   01/25/08    Andrew Mancini associates           
                                                            100-022         5,561                  06/02/06   06/06/06    Andrew mancini                      
                                                            100-023         1,722                  03/22/06   06/21/06    Andrew Mancini associates           
                                                            100-024         3,572                  03/22/06   06/21/06    Andrew Mancini Associates           
                                                            100-025         1,464                  05/04/06   01/25/08    Andrew mancini Associates           
                                                            100-027         8,476                  09/29/06   10/24/06    Andrew Mancini Associates           
                                                            100-029             0                  06/14/06   07/14/06    Andrew Mancini Associates           
                                                            100-030             0                  06/14/06   07/14/06    Andrew Mancini                      
                                                            100-031             0                  06/14/06   07/14/06    Andrew Mancini Associates           
                                                            100-032        -3,531                  06/14/06   07/26/06    Andrew mancini Associates           
                                                            100-033             0                  06/14/06   07/14/06    Andrew Mancini                      
                                                            100-036        21,625                  09/13/06   12/19/06    Andrew Mancini Associates           
                                                            100-037         9,971                  08/08/06   08/31/06    Andrew mancini                      
                                                            100-038         8,769                  08/08/06   08/31/06    Andrew Mancini                      
                                                            100-039         2,099                  08/08/06   08/31/06    Andrew Mancini Associates           
                                                            100-042         2,980                  09/29/06   10/24/06    Andrew Mancini                      
                                                            100-043       160,000                  09/13/06   12/19/06    Andrew Mancini Associates           
                                                            100-044        14,513                  09/13/06   12/19/06    Andrew Mancini Associates           
                                                            100-047           196                  11/14/06   12/27/06    Andrew Mancini Associates           
                                                            100-048         4,731                  11/14/06   12/27/06    Andrew mancini                      
                                                            100-049           425                  11/14/06   01/09/07    Andrew Mancini Associates           
                                                            100-052        25,385                  03/21/07   04/03/07    Andrew Mancini Associates           
                                                            100-053         9,568                  03/02/07   03/13/07    Andrew Mancini                      
                                                            100-054         7,724                  03/02/07   03/13/07    Andrew Mancini Associates           
                                                            100-055        -1,397                  05/09/07   05/15/07    Andrew Mancini Associates           
                                                            100-056         6,420                  03/21/07   04/03/07    Andrew Mancini Associates           
                                                            100-057        12,553                  03/21/07   04/03/07    Andrew Mancini Associates           
                                                            100-059          -352                  03/21/07   04/03/07    Andrew Mancini Associates           
                                                            100-060         6,425                  10/25/07   11/09/07    ANDREW R. MANCINI ASSOICATES, INC.  
                                                            100-063           390                  12/18/07   02/23/08    ANDREW R. MANCINI ASSOCIATES        
                                                            100-068       203,771                  01/10/08   01/25/08    Andrew R. Mancini                   
                                                            100-070         4,011                  12/18/07   02/23/08    ANDREW R. MANCINI ASSOCIATES        
                                                            100-074       -19,950                  07/09/08   12/03/08    ANDREW R. MANCINI INC.              
                                                            100-075         1,699                  07/09/08   12/03/08    Andrew R. Mancini                   
                                                            101-003          -960                  02/07/07   02/22/07    Pag Enterprises                     
                                                            101-004         1,651                  12/18/07   02/23/08    PAG ENTERPRISES,INC                 
                                                            102-001         1,362                  10/27/05   11/08/05    Edward Schalk and Sons              
                                                            102-003         6,513                  03/02/06   06/06/06    Edward Schalk and Sons              
                                                            102-004         6,024                  02/01/06   04/24/06    Edward schalk and Sons              
                                                            102-007         2,378                  02/01/06   04/24/06    Edward Schalk and sons              
                                                            102-010        -3,568                  09/18/06   12/19/06    Edward Schalk                       
                                                            102-012         2,047                  01/10/08   01/25/08    Edward Schalk & Son                 
                                                            102-013        34,160                  05/22/06   01/25/08    Edward  Schalk and son              
                                                            102-015         9,406                  08/29/06   10/13/06    Edward Schalk and Sons              
                                                            102-016         2,877                  08/29/06   10/13/06    Edward Schalk and Sons              
                                                            102-017         4,080                  12/11/06   01/30/07    Edward Schalk                       
                                                            102-018         1,856                  03/21/07   04/03/07    Edward Schalk                       
                                                            102-019         9,236                  05/09/07   05/15/07    Edward Schalk and son               
                                                            102-020         1,203                  05/31/07   08/28/07    Edward Schalk and Sons              
                                                            102-021         9,535                  05/31/07   06/20/07    Edward Schalk and Sons              
                                                            102-022        12,014                  06/11/07   08/28/07    Edward Schalk and Sons              
                                                            102-023.       19,447                  06/11/07   06/20/07    Edward Schalk and Son               
                                                            102-024        19,527                  06/11/07   06/20/07    Edward Schalk and Son               
                                                            102-025         9,429                  05/31/07   06/20/07    Edward Schalk and Sons              
                                                            102-026         1,905                  06/04/07   06/20/07    Edward Schalk and Son               
                                                            102-027         6,501                  08/24/07   10/22/07    EDWARD SCHALK & SONS, INC.          
                                                            102-029         2,350                  01/07/08   01/07/08    Edward Schalk & Son                 
                                                            102-030        19,950                  07/09/08   12/03/08    Edward Schalk & Sons,Inc            
                                                            102-05          7,313                  02/01/06   04/24/06    Edward Schalk and Sons              
                                                            103-001        -2,464                  10/23/06   12/18/06    D and R Jones Construction          
                                                            104-002         2,785                  02/01/06   04/24/06    John H. Cook Jr. Painting Contr.,Inc
                                                            104-005          -187                  03/02/06   06/06/06    John Cook Jr Painting               
                                                            104-008         5,562                  05/04/06   01/25/08    John Cook Painting                  
                                                            104-009         6,805                  01/10/08   01/25/08    John H. Cook Painting Contractors   
                                                            104-010         2,661                  05/01/06   06/02/06    John H. Cook                        
                                                            104-013         1,003                  05/04/06   01/25/08    John Cook Painting                  
                                                            104-014         9,890                  05/04/06   01/25/08    john Cook Painting                  
                                                            104-015         2,180                  08/08/06   08/31/06    John Cook Jr                        
                                                            104-016         2,500                  11/14/06   12/27/06    John Cook Painting                  
                                                            104-018           812                  11/14/06   12/27/06    John Cook                           
                                                            104-020         7,277                  02/07/07   02/22/07    John Cook Painting                  
                                                            104-021         2,288                  03/02/07   03/13/07    John Cook Jr                        
                                                            105-001         7,310                  10/27/05   11/08/05    northeast Interior Systems          
                                                            105-003         5,617                  01/10/08   01/25/08    Northeast Interior System           
                                                            105-004        -5,000                  04/05/07   05/15/07    Northeast Interior Systems          
                                                            105-005         6,080                  01/22/08   04/04/08    Northeast Interior System           
                                                            105-012         6,812                  01/10/08   01/25/08    Northeast Interior System           
                                                            106-001        18,313                  12/05/05     /  /      James Lewis                         
                                                            106-002        20,438                  12/05/05     /  /      James Lewis                         
                                                            106-006         6,156                  10/27/05   05/24/06    James Lewis                         
                                                            106-008         4,033                  02/01/06   05/24/06    James Lewis                         
                                                            106-010        -3,568                  05/04/06   06/02/06    James Lewis Inc                     
                                                            106-011         8,989                  01/10/08   04/03/08    James L. Lewis                      
                                                            106-012          -362                  04/26/06   05/24/06    JAMES L. LEWIS, INC.                
                                                            106-014         3,896                  06/06/06   01/30/07    James Lewis                         
                                                            106-019         4,972                  09/18/06   12/18/06    James Lewis                         
                                                            106-020         2,925                  09/13/06   03/23/07    James Lewis                         
                                                            106-021         1,034                  09/18/06   12/18/06    James Lewis                         
                                                            106-023           813                  09/18/06   12/18/06    James Lewis                         
                                                            106-025           535                  10/23/06   12/18/06    James Lewis                         
                                                            106-026           306                  04/26/06   05/24/06    CHRIST CONSTRUCTION                 
                                                            106-027         5,191                  03/21/07   08/15/07    Jmes Lewis                          
                                                            106-028         4,295                  03/21/07   08/15/07    James Lewis                         
                                                            106-029         4,752                  05/09/07   05/15/07    James Lewis                         
                                                            107-001        18,346                  03/13/06     /  /      John Contro and Sons                
                                                            107-002         9,355                  03/02/06     /  /      John Contro Sons                    
                                                            107-003        -3,870                  03/02/06   03/14/06    John Contro and Sons                
                                                            107-005         4,789                  01/03/06   05/26/06    John Contro and Sons                
                                                            107-006         1,592                  01/03/06   06/30/06    John Contro and Sons                
                                                            107-007         7,652                  03/02/06   03/14/06    John Contro and Sons                
                                                            107-010         4,674                  09/29/06   10/19/06    john Contro and Sons                
                                                            107-011        -1,840                  08/08/06   12/18/06    John Contro                         
                                                            107-013        -1,091                  03/26/07   04/02/07    John Contro and Sons                
                                                            107-12          1,961                  09/13/06   12/18/06    John Contro and Sons                
                                                            108-001         4,235                  08/08/06   08/31/06    Allied Fire Protection              
                                                            108-004        18,270                  12/18/07   08/07/08    ALLIED FIRE PROTECTION SYSTEMS,INC  
                                                            109-005         6,646                  03/22/06   05/24/06    john Mills Electric                 
                                                            109-006         8,791                  03/22/06   05/24/06    John Mills Electric                 
                                                            109-007         7,590                  06/06/06   07/26/06    john Mills electric                 
                                                            109-010         3,577                  06/06/06   11/22/06    John Mills electric                 
                                                            109-013         4,697                  08/08/06   12/18/06    John Mills Electric                 
                                                            109-014         8,474                  10/23/06     /  /      John Mills Electric                 
                                                            109-015         6,790                  10/23/06   03/15/07    John Mills Electric                 
                                                            109-016           293                  10/23/06   03/15/07    John Mills Electric                 
                                                            109-017       -48,930                  03/05/07     /  /      John Mills Electric, Incorp.        
                                                            109-018         1,755                  02/07/07   03/12/07    John Mills Electric                 
                                                            109-020         5,672                  03/02/07   08/15/07    John Mills Electric                 
                                                            109-022         4,773                  02/01/08   04/04/08    JOHN MILLS ELECTRIC, INC            
                                                            109-025         2,264                  02/01/08   08/04/08    JOHN MILLS ELECTRIC, INC            
                                                            109-027        -7,000                  03/05/07   08/05/08    John Mills Electric, Incorp.        
 
07-1587   Reconstruction               0-003-016  03/13/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1768   Reconstruction               0-003-017  07/02/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          11,450                  04/12/10   05/28/10    CJ MARLEY CONSTRUCTION INC          
 
09-1408   Reconstruction               0-003-018  06/29/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0885   Reconstruction               0-003-019  06/29/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ID-4            1,807                  02/17/15   02/18/15    Tri County Security Systems, Inc.   
                                                            SC-3           -2,000                  12/10/14   12/15/14    Smith Site Development LLC          
 
13-1560   Reconstruction               0-003-020  06/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001             650                  12/15/14   02/06/15    Priority Connections, LLC           
                                                            E-002           1,113                  11/21/14   12/30/14    Priority Connections LLC            
 
15-0098   Reconstruction               0-003-021  08/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-GC001            0                  11/02/15   12/23/15    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            AD-GC002            0                  11/02/15   12/23/15    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-001         10,900                  11/02/15   12/23/15    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-002          3,023                  11/02/15   12/23/15    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-003         30,068                  03/08/16   03/18/16    Bellows Construction Specialties,LLC
 
15-1658   Reconstruction               0-003-022  06/01/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-001         -16,046                  08/03/16   10/07/16    E.V. Roofing & Construction Supply  
                                                            R-002          -7,500                  10/24/16   11/17/16    E.V. Roofing & Construction Supply  
 
18-0117   Reconstruction               0-003-023  12/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            301-060        19,887                  07/16/20   09/04/20    FAHS CONSTRUCTION GROUP             
                                                            301-061         1,635                  07/16/20   09/04/20    FAHS CONSTRUCTION GROUP             
                                                            301-070         1,940                  08/24/20   11/03/20    FAHS CONSTRUCTION GROUP             
                                                            301-081        14,951                  11/10/20   02/10/21    FAHS CONSTRUCTION GROUP             
                                                            301-084B        8,649                  11/10/20   02/10/21    FAHS CONSTRUCTION GROUP             
                                                            301-085        27,148                  12/31/20   03/16/21    FAHS CONSTRUCTION GROUP             
                                                            301-086        17,542                  12/31/20   03/16/21    FAHS CONSTRUCTION GROUP             
                                                            301-091         4,283                  02/01/21   04/09/21    FAHS CONSTRUCTION GROUP             
                                                            301-094         1,018                  02/01/21   04/09/21    FAHS CONSTRUCTION GROUP             
                                                            301-095         3,898                  04/26/21   05/25/21    FAHS CONSTRUCTION GROUP             
                                                            301-096         5,045                  06/10/21   03/15/22    Fahs Construction Group             
                                                            302-026           595                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            302-030         1,550                  05/10/21   08/17/21    SIRACUSA MECHANICAL, INC.           
                                                            302-031         4,593                  06/28/21   11/16/21    Siracusa Mechanical Inc             
                                                            303-026         1,492                  11/23/20   02/05/21    SIRACUSA MECHANICAL, INC.           
                                                            303-027           322                  02/05/21   03/30/21    SIRACUSA MECHANICAL, INC.           
                                                            303-031         1,819                  04/02/21   05/05/21    SIRACUSA MECHANICAL, INC.           
                                                            304-003           445                  09/25/20   11/10/20    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-010         1,514                  03/01/21   04/19/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-014        15,293                  03/01/21   04/19/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-015        12,021                  05/05/21   08/24/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-021        34,947                  06/28/21   11/16/21    NelCorp Electrical Contracting      
                                                            304-025         1,036                  06/28/21   11/16/21    NelCorp Electrical                  
                                                            305-001         5,458                  02/05/21   03/23/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            305-002        27,908                  12/31/20   03/16/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            305-003        18,441                  03/01/21   04/20/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            305-005         7,546                  07/09/21   01/13/22    Bolands Excavating & Topsoil        
                                                            305-006        13,605                  06/07/21   01/27/22    Bolands Excavating & Topsoil Inc    
 
17-0643   Reconstruction               0-003-024  02/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-005         2,116                  08/22/18   09/07/18    HALE ROOFING CONTRACTORS INC        
                                                            101-006          -550                  10/05/18   11/06/18    HALE ROOFING CONTRACTORS INC        
                                                            101-007         2,084                  10/05/18   11/06/18    HALE ROOFING CONTRACTORS INC        
                                                            101-008           410                  10/05/18   11/06/18    HALE ROOFING CONTRACTORS INC        
                                                            101-009         1,637                  10/05/18   11/06/18    HALE ROOFING CONTRACTORS INC        
                                                            101-015           475                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-016         3,073                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-018         4,184                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
 
18-0955   Reconstruction               0-003-026  01/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0443   Reconstruction               0-003-027  01/08/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0240   Reconstruction               0-003-028  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            503-002         6,400                  01/17/23   11/16/23    DIEKOW ELECTRIC INC                 
                                                            505-001         4,842                  09/12/22   09/07/23    Bolands Excavat& Topsoil Inc        
 
22-0031   Reconstruction               0-003-029  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1071   Reconstruction               0-003-030  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1159FP Reconstruction               0-003-FP1  03/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Freeville Elementary:
93-0355   Reconstruction               0-004-005  10/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0270   Reconstruction               0-004-007  12/22/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-009           949                  03/02/06   06/06/06    Andrew Mancini Associates           
                                                            100-015         1,538                  02/01/06   04/21/06    Andrew mancini associates           
                                                            100-021         2,378                  03/02/06   06/06/06    Andrew mancini                      
                                                            100-040         2,094                  09/29/06   10/24/06    Andrew Mancini Associates           
                                                            100-046         4,090                  08/29/06   10/13/06    Andrew Mancini Associates           
                                                            100-051         3,617                  03/21/07   04/03/07    Andrew Mancini Associates           
                                                            100-058         1,735                  03/21/07   04/03/07    Andrew Mancini Associates           
                                                            100-061           826                  06/04/07   06/20/07    Andrew mancini Associates           
                                                            100-071         1,197                  12/18/07   12/28/07    ANDREW R. MANCINI ASSOCIATES        
                                                            102-006           618                  02/01/06   04/24/06    Edward Schalk and Sons              
                                                            102-008         2,200                  02/01/06   04/24/06    Edward schalk                       
                                                            102-011         1,573                  01/10/08   01/25/08    Edward Schalk & Son                 
                                                            102-028           374                  08/24/07   08/29/07    EDWARD SCHALK & SON, INC.           
                                                            104-001         1,813                  01/18/06   06/09/06    John Cook Jr Painting               
                                                            104-003           543                  03/02/06   06/06/06    John Cook Painting Contr            
                                                            104-012         4,847                  01/10/08   01/25/08    John H. Cook Painting Contractors   
                                                            106-004         8,244                  01/10/08   04/03/08    James L. Lewis Inc.                 
                                                            106-005         6,416                  10/27/05   11/01/05    James Lewis                         
                                                            106-007        11,225                  02/01/06   05/24/06    James Lewis                         
                                                            106-009         2,119                  02/01/06   05/24/06    James Lewis                         
                                                            106-018             0                  06/06/06   04/03/08    James Lewis                         
                                                            106-024         1,794                  09/18/06   12/19/06    James Lewis                         
                                                            106-026         2,098                  10/23/06   02/22/07    James Lewis                         
                                                            107-009           887                  06/14/06   09/29/06    John Contro                         
                                                            109-002         3,332                  03/22/06   05/24/06    John mills Electric                 
                                                            109-008           276                  06/06/06   06/23/06    John Mills electric                 
                                                            109-029        -5,000                  03/05/08     /  /      John Mills Electrict, Incorp.       
 
11-1304   Reconstruction               0-004-008  12/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0886   Reconstruction               0-004-009  06/29/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2              218                  12/10/13   02/14/14    Diekow Electric, Inc.               
                                                            EC-4            2,550                  02/06/14   02/24/14    DIEKOW ELECTRIC INC                 
                                                            ID-3            1,807                  02/17/15   02/18/15    Tri County Security Systems, Inc.   
 
11-1311   Reconstruction               0-004-010  06/01/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01               0                  11/02/12   03/08/13    WEATHERMASTER ROOFING CO INC        
 
18-0118   Reconstruction               0-004-011  12/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401B-002        1,227                  12/04/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            401B-003        1,819                  12/04/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            401B-005        2,692                  02/05/21   03/23/21    FAHS CONSTRUCTION GROUP             
                                                            401B-006        3,638                  04/26/21   05/18/21    FAHS CONSTRUCTION GROUP             
                                                            402B-001        3,253                  12/31/20   02/26/21    PETCOSKY & SON PLUMBING & HEATING   
                                                            404B-002        4,393                  12/31/20   02/26/21    SCHULER-HAAS ELECTRICAL CONTRACTORS 
                                                            404B-004          517                  12/31/20   02/26/21    SCHULER-HAAS ELECTRICAL CONTRACTORS 
 
16-2165   Reconstruction               0-004-012  10/16/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0641   Reconstruction               0-004-013  02/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-014           758                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
 
18-1634   Reconstruction               0-004-014  05/23/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401-001           491                  10/15/19   10/18/19    KING & KING MECHANICAL, INC.        
                                                            401-002         1,158                  12/05/19   12/27/19    KING & KING MECHANICAL, INC.        
                                                            401-003           498                  11/12/19   11/20/19    KING & KING MECHANICAL, INC.        
                                                            401-004         8,037                  11/12/19   11/20/19    KING & KING MECHANICAL, INC.        
                                                            401-005           392                  11/29/19   12/05/19    KING & KING MECHANICAL, INC.        
                                                            401-006           455                  11/29/19   12/05/19    KING & KING MECHANICAL, INC.        
 
22-0032   Reconstruction               0-004-015  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0096   Reconstruction               0-004-016  10/24/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          3,217                  07/03/23     /  /      ANTHONY J GIAMMARINO                
                                                            GC-002          6,585                  07/03/23     /  /      ANTHONY J GIAMMARINO                
                                                            GC-003          2,311                  07/03/23     /  /      ANTHONY J GIAMMARINO ASSC           
 
22-1754   Reconstruction               0-004-017  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0551   Reconstruction               0-004-018  11/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1088SC Visual Structural Inspection 0-004-SC1  04/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Junior/Senior High School:
93-0356   Reconstruction               0-005-009  10/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0351   Reconstruction               0-005-010  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0386   Reconstruction               0-005-011  11/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0497   Additions and Alterations    0-005-012  02/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0209   Reconstruction               0-005-013  09/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1691   Reconstruction               0-005-014  01/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-01          1,274                  09/11/01   01/14/02    Sunstream Corp.                     
                                                            E-1            16,402                  10/25/01   02/11/02    Burns Elec.                         
                                                            E-2            14,838                  01/15/02   03/01/02    Burns Elec.                         
                                                            EC-03             675                  12/14/02   01/03/03    Burns Elec.                         
                                                            GC-1           36,211          29,563  11/28/03   12/05/03    S&W Gen. Contractors                
                                                            GC-2          -10,496                  02/07/02   03/26/02    S&W Gen. Contractors                
                                                            SC-02             760                  11/12/02   01/02/03    Fahs-Rolston Paving                 
                                                            SC-03           3,210                  11/12/02   01/02/03    Fahs-Rolston                        
                                                            SC-04          -2,730                  11/27/02   03/11/03    Fahs-Rolston                        
                                                            SC-05           1,922                  11/12/02   01/02/03    Fahs-Rolston                        
                                                            SC-06             177                  11/12/02   01/02/03    Fahs-Rolston                        
                                                            SC-07             942                  11/12/02   01/02/03    Fahs-Rolston                        
                                                            SC-08          26,786                  11/12/02   01/02/03    Fahs-Rolston                        
                                                            SC-09           3,597                  11/12/02   01/02/03    Fahs-Rolston                        
                                                            SC-1           69,688                  09/06/01   01/08/02    Fahs-Rolston                        
                                                            SC-10           2,300                  11/12/02   01/02/03    Fahs-Rolston                        
                                                            SC-11           2,270                  10/07/03   11/05/03    Fahs Rolston                        
 
01-1493   Additions and Alterations    0-005-015  02/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01             440                  11/28/03   01/05/04    Richardson Bros.                    
                                                            EC-02           1,211                  01/29/07   01/30/07    Richardson brothers                 
                                                            EC-03           4,362                  11/04/05   06/30/06    RICHARDSON BROTHERS, INC.           
                                                            EC-04             423                  02/11/04   03/01/04    Richardson Bros.                    
                                                            EC-05           2,879                  03/19/04   04/23/04    Richardson Bros.                    
                                                            EC-06             795                  04/12/04   04/23/04    Richardson Bros.                    
                                                            EC-07          23,626                  05/20/04   06/15/04    Richardson Bros.                    
                                                            EC-08             650                  06/09/04   06/14/04    Richardson Bros.                    
                                                            EC-09           1,441                  06/22/04   06/30/04    Richardson Bros.                    
                                                            EC-10           1,356                  07/26/04   10/12/04    Richardson Bros.                    
                                                            EC-11           6,929                  07/26/04   09/27/04    Richardson Bros.                    
                                                            EC-12           2,860                  07/30/04   08/05/04    Richardson Bros.                    
                                                            EC-13           5,857                  08/23/04   09/28/04    Richardson Bros.                    
                                                            EC-14          16,901                  08/23/04   09/28/04    Richardson Bros.                    
                                                            EC-15           2,609                  09/21/04   09/28/04    Richardson Bros.                    
                                                            EC-16          14,998                  10/04/04   11/29/04    Richardson Bros.                    
                                                            EC-17           6,297                  10/04/04   10/28/04    Richardson Bros.                    
                                                            EC-18          13,400                  10/04/04   10/28/04    Richardson Bros.                    
                                                            EC-19          15,302                  11/24/04   06/21/05    Richardson Bros.                    
                                                            EC-20           3,080                  12/14/04   06/23/05    Richardson Bros.                    
                                                            GC-01             903                  09/15/03   09/19/03    Court St. Co.                       
                                                            GC-02          -2,499                  10/07/03   11/17/03    Court St. Co.                       
                                                            GC-03           1,229                  11/28/03   12/09/03    Court St. Co.                       
                                                            GC-04           2,122                  11/28/03   12/09/03    Court St. Co.                       
                                                            GC-05             358                  02/02/04   02/20/04    Court St. Co.                       
                                                            GC-06             602                  02/11/04   02/20/04    Court St. Co.                       
                                                            GC-07           2,310                  02/11/04   02/20/04    Court St. Co.                       
                                                            GC-08           1,441                  02/11/04   02/20/04    Court St. Co.                       
                                                            GC-09           1,905                  03/19/04   04/06/04    Court St. Co.                       
                                                            GC-10             770                  03/19/04   04/06/04    Court St. Co.                       
                                                            GC-11           1,436                  04/12/04   04/20/04    Court St. Co.                       
                                                            GC-12             819                  04/12/04   04/20/04    Court St. Co.                       
                                                            GC-13           2,903                  04/12/04   04/20/04    Court St. Co.                       
                                                            GC-14          -1,944                  04/12/04   04/20/04    Court St. Co.                       
                                                            GC-15          12,853                  04/16/04   04/23/04    Court St. Co.                       
                                                            GC-16           7,582                  04/16/04   04/23/04    Court St. Co.                       
                                                            GC-17             907                  04/16/04   04/23/04    Court St. Co.                       
                                                            GC-18           3,359                  06/09/04   06/14/04    Court St. Co.                       
                                                            GC-19           1,134                  07/20/04   07/27/04    Court St. Co.                       
                                                            GC-20          34,727                  09/15/04   10/04/04    Court St. Co.                       
                                                            GC-21           1,350                  11/17/04   11/19/04    Fahs Rolston Paving                 
                                                            GC-22           7,889                  12/20/04   12/24/04    Court St. Co.                       
                                                            GC-23           3,651                  01/29/07   01/30/07    Court Street Companies              
                                                            GC-24           5,038                  02/16/05   03/02/05    Court Street Companies              
                                                            GC-25          15,462                  12/30/04   01/12/05    Court St. Co.                       
                                                            GC-26          17,976                  12/30/04   06/30/05    Court St. Co.                       
                                                            GC-27           4,815                  12/30/04   01/12/05    Court St. Co.                       
                                                            GC-28           5,481                  12/30/04   01/12/05    Court St. Co.                       
                                                            GC-29            -174                  12/30/04   01/12/05    Court St. Co.                       
                                                            GC-30          -2,500                  10/14/05   10/28/05    court Street Com                    
                                                            HC-01             906                  11/24/03   01/30/07    Frey & Campbell                     
                                                            HC-02           9,460                  01/20/04   01/28/04    Frey & Campbell                     
                                                            HC-03             850                  02/03/04   01/30/07    Frey & Campbell                     
                                                            HC-04             979                  01/20/04   01/28/04    Frey & Campbell                     
                                                            HC-05           5,094                  02/11/04   03/01/04    Frey & Campbell                     
                                                            HC-06           1,026                  03/03/04   04/22/04    Frey & Campbell                     
                                                            HC-07           1,758                  04/12/04   04/23/04    Frey & Campbell                     
                                                            HC-08             669                  04/12/04   04/23/04    Frey & Campbell                     
                                                            HC-09             534                  06/09/04   06/14/04    Frey & Campbell                     
                                                            HC-10           2,342                  06/08/04   06/14/04    Frey & Campbell                     
                                                            HC-11          12,778                  07/30/04   08/05/04    Frey & Campbell                     
                                                            HC-12           3,103                  07/30/04   08/05/04    Frey & Campbell                     
                                                            HC-13           2,960                  08/23/04   09/27/04    Frey & Campbell                     
                                                            HC-14          19,229                  08/23/04   09/28/04    Frey & Campbell                     
                                                            HC-15          36,046          36,046  08/23/04   09/28/04    Frey & Campbell                     
                                                            HC-16           4,193                  09/15/04   10/04/04    Frey & Campbell                     
                                                            HC-17           2,561                  11/24/04   03/02/05    Frey & Campbell                     
                                                            HC-18           7,607                  12/22/04   06/21/05    Frey & Campbell                     
                                                            HC-19             -41                  12/22/04   03/02/05    Frey & Campbell                     
                                                            PC-01             660                  09/18/03   10/02/03    Frey & Campbell                     
                                                            PC-02           1,223                  12/12/03   01/06/04    Frey & Campbell                     
                                                            PC-03           5,772                  11/24/04   05/02/05    Frey Campbell                       
                                                            PC-04            -437                  02/18/05   06/30/05    Frey Campbell                       
                                                            SC-01           6,450                  09/29/04   10/04/04    Ruston Paving                       
                                                            SC-02           5,444                  11/24/04   12/13/04    Ruston Paving                       
                                                            TC-01          -1,655                  10/04/04   10/12/04    RC Daniels                          
                                                            TC-02          -8,373                  02/22/05   03/02/05    RC Daniels Inc                      
 
05-0119   Reconstruction               0-005-017  08/19/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1197   Reconstruction               0-005-018  08/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            113-001          -500                  02/01/08   04/04/08    ITHACOR MANAGEMENT INC.             
 
07-0835   Reconstruction               0-005-019  06/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          4,190                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-002          9,555                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-003         11,148                  04/12/10   06/16/10    MATCO ELECTRICAL CORPORATION        
                                                            EC-004          1,158                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-005          3,757                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-006          5,125                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-007          4,699                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-008          2,768                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-009          2,387                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-010          2,360                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-011          2,455                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-012          9,559                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-013              0                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-014         46,531                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-015          1,037                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-016          1,631                  04/12/10   06/16/10    MATCO ELECTRIC CORPORATION          
                                                            EC-017          2,454                  04/12/10   08/13/12    MATCO ELECTRIC CORPORATION          
                                                            EC-018          9,964                  05/19/10   08/13/12    MATCO ELECTRIC CORPORATION          
                                                            EC-019          5,982                  03/26/12   01/25/13    MATCO ELECTRIC CORP                 
                                                            GC-0001         1,256                  03/26/12   10/24/12    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-001          9,818                  04/12/10   05/28/10    STREETER ASSOCIATES INC             
                                                            GC-002         12,548                  04/12/10   05/28/10    STREETER ASSOCIATES INC             
                                                            GC-002          8,185                  03/26/12   10/24/12    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-003          8,217                  04/12/10   05/28/10    STREETER ASSOCIATES INC             
                                                            GC-003            441                  03/26/12   10/24/12    Bellows Construction                
                                                            GC-004          3,476                  04/12/10   05/28/10    STREETER ASSOCIATES INC             
                                                            HC-001          3,750                  09/17/12   08/09/13    FREY & CAMPBELL INC                 
                                                            MC-001          1,534                  04/12/10   05/28/10    LECLAIRE-FLEMING MECHANICAL CONT INC
                                                            MC-002          7,515                  03/26/12   08/09/13    LECLAIR FLEMING MECHANICAL CONT INC 
                                                            MC-003          9,075                  03/26/12   08/09/13    LECLAIR FLEMING MECHANICAL CONT INC 
                                                            PC-001          3,832                  04/12/10   06/16/10    FREY & CAMPBELL INC                 
                                                            PC-002              0                  04/12/10   06/16/10    FREY & CAMPBELL INC                 
                                                            PC-003          1,859                  04/12/10   06/16/10    FREY & CAMPBELL INC                 
                                                            PC-004              0                  04/12/10   06/16/10    FREY & CAMPBELL INC                 
                                                            PC-005             71                  04/12/10   06/16/10    FREY & CAMPBELL INC                 
                                                            PC-006              0                  04/12/10   06/16/10    FREY & CAMPBELL INC                 
                                                            PC-007            384                  04/12/10   08/13/12    FREY & CAMPBELL INC                 
 
10-1141   Reconstruction               0-005-021  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0887   Reconstruction               0-005-022  06/29/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            3,017                  12/10/13   02/14/14    Diekow Electric, Inc.               
                                                            GC-1           -3,797                  03/12/14   04/15/14    Streeter Associates, Inc.           
                                                            ID-1              249                  02/17/15   02/18/15    Tri County Security Systems, Inc.   
                                                            MC-1           -5,109                  04/16/14   05/22/14    KIMBLE INC                          
                                                            SC-1           32,497                  11/04/13   11/21/13    SMITH SITE DEVELOPMENT LLC          
                                                            SC-2           -1,893                  11/04/13   11/21/13    SMITH SITE DEVELOPMENT LLC          
                                                            SC-4           -6,608                  01/12/15   01/21/15    Smith Site Development, LLC         
 
12-1140   Reconstruction               0-005-023  06/03/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            TC-1            2,687                  12/10/13   01/03/14    Richardson Brothers Electrical Contr
                                                            TC-2            8,313                  12/10/13   01/03/14    Richardson Brothers Electrical Contr
                                                            TC-3              952                  02/24/14   04/15/14    Richardson Brothers Electrical      
 
13-0569   Reconstruction               0-005-024  09/08/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1402   Reconstruction               0-005-025  06/12/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -12,705                  08/03/15   08/26/15    Bellows Construction Specialties LLC
                                                            GC-002          3,329                  11/02/15   12/01/15    Bellows Construction Specialties, LC
                                                            GC-003            708                  12/24/15   01/12/16    BELLOWS CONSTRUCTION SPECIALTIES    
 
18-0119   Reconstruction               0-005-026  12/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004             4,255                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            005             2,500                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            006             5,644                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            007             3,198                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            008             3,260                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            301-001         5,949                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-002        19,984                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-003        32,184                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-004         4,899                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-005        20,966                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-006         9,894                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-007        17,813                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-008        14,538                  07/15/19   07/18/19    FAHS CONSTRUCTION GROUP             
                                                            301-009        14,987                  09/11/19   09/24/19    FAHS CONSTRUCTION GROUP             
                                                            301-010        17,050                  09/11/19   09/24/19    FAHS CONSTRUCTION GROUP             
                                                            301-011         7,998                  09/11/19   09/24/19    FAHS CONSTRUCTION GROUP             
                                                            301-012         2,712                  09/11/19   09/24/19    FAHS CONSTRUCTION GROUP             
                                                            301-013         2,146                  09/11/19   09/24/19    FAHS CONSTRUCTION GROUP             
                                                            301-014         9,423                  09/11/19   09/24/19    FAHS CONSTRUCTION GROUP             
                                                            301-015         7,179                  10/03/19   10/10/19    FAHS CONSTRUCTION GROUP             
                                                            301-016           763                  10/03/19   10/10/19    FAHS CONSTRUCTION GROUP             
                                                            301-017        16,039                  10/03/19   10/10/19    FAHS CONSTRUCTION GROUP             
                                                            301-018         1,964                  10/03/19   10/10/19    FAHS CONSTRUCTION GROUP             
                                                            301-019        25,553                  10/03/19   10/10/19    FAHS CONSTRUCTION GROUP             
                                                            301-020           987                  11/08/19   11/15/19    FAHS CONSTRUCTION GROUP             
                                                            301-021         3,684                  11/08/19   11/15/19    FAHS CONSTRUCTION GROUP             
                                                            301-022         6,442                  11/08/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-023        31,849                  11/08/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-024         4,040                  11/08/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-025         2,167                  11/08/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-026           905                  11/08/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-027         2,254                  11/12/19   11/20/19    FAHS CONSTRUCTION GROUP             
                                                            301-028           755                  11/20/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-029         5,669                  11/20/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-030        10,510                  11/20/19   11/27/19    FAHS CONSTRUCTION GROUP             
                                                            301-031        14,518                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-032        12,382                  01/06/20   06/23/20    FAHS CONSTRUCTION GROUP             
                                                            301-033         4,143                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-034         2,705                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-035         6,994                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-036        11,360                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-037        14,117                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-038           891                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-039           363                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-040        12,690                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-041        -2,437                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-042         3,625                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-043        15,391                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-044         1,158                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-045        13,533                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-046        12,876                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-047        -1,490                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-048        33,948                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-049        11,360                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-050          -850                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-050          -850                  06/03/20   07/07/20    FAHS CONSTRUCTION GROUP             
                                                            301-051         7,632                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-051         7,632                  06/03/20   07/07/20    FAHS CONSTRUCTION GROUP             
                                                            301-052        13,598                  01/06/20   01/31/20    FAHS CONSTRUCTION GROUP             
                                                            301-052        13,598                  06/03/20   07/07/20    FAHS CONSTRUCTION GROUP             
                                                            301-053        22,550                  06/03/20   07/07/20    FAHS CONSTRUCTION GROUP             
                                                            301-053        22,550                  06/22/20   07/24/20    FAHS CONSTRUCTION GROUP             
                                                            301-054        29,863                  06/03/20   07/07/20    FAHS CONSTRUCTION GROUP             
                                                            301-055         7,218                  06/03/20   07/07/20    FAHS CONSTRUCTION GROUP             
                                                            301-055         7,218                  06/12/20   07/15/20    FAHS CONSTRUCTION GROUP             
                                                            301-057        15,410                  06/12/20   07/15/20    FAHS CONSTRUCTION GROUP             
                                                            301-058        14,939                  06/12/20   07/15/20    FAHS CONSTRUCTION GROUP             
                                                            301-062        24,556                  06/12/20   07/15/20    FAHS CONSTRUCTION GROUP             
                                                            301-063        12,581                  06/16/20   07/15/20    FAHS CONSTRUCTION GROUP             
                                                            301-064        25,388                  07/20/20   10/28/20    FAHS CONSTRUCTION GROUP             
                                                            301-065        29,777                  07/20/20   10/28/20    FAHS CONSTRUCTION GROUP             
                                                            301-066        19,476                  12/04/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            301-067        32,912                  11/10/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            301-068        31,743                  07/20/20   10/28/20    FAHS CONSTRUCTION GROUP             
                                                            301-069        29,451                  07/20/20   10/28/20    FAHS CONSTRUCTION GROUP             
                                                            301-071         1,406                  11/09/20   02/11/21    FAHS CONSTRUCTION GROUP             
                                                            301-072         6,939                  11/10/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            301-073        17,370                  11/10/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            301-075A        1,894                  11/10/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            301-076         9,787                  12/18/20   04/06/21    FAHS CONSTRUCTION GROUP             
                                                            301-077        17,896                  11/10/20   02/18/21    FAHS CONSTRUCTION GROUP             
                                                            301-078        18,661                  11/10/20   01/28/21    FAHS CONSTRUCTION GROUP             
                                                            301-079        21,674                  11/10/20   01/28/21    FAHS CONSTRUCTION GROUP             
                                                            301-080        17,550                  11/10/20   01/28/21    FAHS CONSTRUCTION GROUP             
                                                            301-082        27,926                  11/10/20   01/28/21    FAHS CONSTRUCTION GROUP             
                                                            301-084A       22,170                  11/10/20   01/28/21    FAHS CONSTRUCTION GROUP             
                                                            301-087         7,030                  12/31/20   05/14/21    FAHS CONSTRUCTION GROUP             
                                                            301-088        26,770                  12/31/20   05/13/21    FAHS CONSTRUCTION GROUP             
                                                            301-089         5,941                  12/31/20   05/13/21    FAHS CONSTRUCTION GROUP             
                                                            301-090         7,090                  03/22/21   05/11/21    FAHS CONSTRUCTION GROUP             
                                                            301-092         2,575                  02/01/21   03/19/21    FAHS CONSTRUCTION GROUP             
                                                            301-093        31,007                  02/01/21   03/19/21    FAHS CONSTRUCTION GROUP             
                                                            301-097         6,845                  06/10/21   03/15/22    Fahs Construction Group             
                                                            301-099         5,073                  06/10/21   03/15/22    Fahs Construction Group             
                                                            301-100         2,344                  06/28/21   03/16/22    Fahs Construction Group             
                                                            302-001        18,779                  06/13/19   06/19/19    SIRACUSA MECHANICAL, INC.           
                                                            302-002           403                  07/15/19   07/17/19    SIRACUSA MECHANICAL, INC.           
                                                            302-003         1,380                  08/05/19   08/20/19    SIRACUSA MECHANICAL, INC.           
                                                            302-009           403                  10/03/19   10/08/19    SIRACUSA MECHANICAL, INC.           
                                                            302-010           345                  10/03/19   10/08/19    SIRACUSA MECHANICAL, INC.           
                                                            302-011           259                  10/03/19   10/08/19    SIRACUSA MECHANICAL, INC.           
                                                            302-012         5,391                  10/15/19   10/18/19    SIRACUSA MECHANICAL, INC.           
                                                            302-013         2,875                  10/15/19   10/18/19    SIRACUSA MECHANICAL, INC.           
                                                            302-014         3,984                  11/20/19   11/26/19    SIRACUSA MECHANICAL, INC.           
                                                            302-015        12,299                  11/20/19   11/26/19    SIRACUSA MECHANICAL, INC.           
                                                            302-016         9,134                  02/20/20   06/09/20    SIRACUSA MECHANICAL, INC.           
                                                            302-017         4,735                  07/20/20   09/04/20    SIRACUSA MECHANICAL, INC.           
                                                            302-018        11,662                  07/20/20   09/04/20    SIRACUSA MECHANICAL, INC.           
                                                            302-019           517                  07/20/20   09/04/20    SIRACUSA MECHANICAL, INC.           
                                                            302-020         2,300                  07/20/20   09/04/20    SIRACUSA MECHANICAL, INC.           
                                                            302-022         7,895                  08/24/20   10/29/20    SIRACUSA MECHANICAL, INC.           
                                                            302-023        15,114                  09/09/20   11/06/20    SIRACUSA MECHANICAL, INC.           
                                                            302-024         1,437                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            302-025           567                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            302-027         3,266                  02/01/21   03/25/21    SIRACUSA MECHANICAL, INC.           
                                                            302-028         5,937                  04/02/21   05/05/21    SIRACUSA MECHANICAL, INC.           
                                                            302-032         2,191                  06/28/21   11/16/21    Siracusa Mechanical Inc             
                                                            302-034         4,830                  06/28/21   11/16/21    Siracusa Mechanical                 
                                                            302-035         1,664                  07/09/21   12/16/21    Siracusa Mechanical Inc             
                                                            303-001         2,300                  07/24/19   07/25/19    SIRACUSA MECHANICAL, INC.           
                                                            303-002           911                  07/24/19   07/25/19    SIRACUSA MECHANICAL, INC.           
                                                            303-003           912                  08/05/19   08/20/19    SIRACUSA MECHANICAL, INC.           
                                                            303-004        14,748                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            303-005         3,536                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            303-006         4,168                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            303-007         3,633                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            303-008        27,790                  09/11/19   09/13/19    SIRACUSA MECHANICAL, INC.           
                                                            303-009         3,994                  11/20/19   11/26/19    SIRACUSA MECHANICAL, INC.           
                                                            303-010         7,087                  11/20/19   11/26/19    SIRACUSA MECHANICAL, INC.           
                                                            303-011         2,314                  11/20/19   11/26/19    SIRACUSA MECHANICAL, INC.           
                                                            303-012         3,162                  11/20/19   11/26/19    SIRACUSA MECHANICAL, INC.           
                                                            303-013           863                  12/11/19   12/20/19    SIRACUSA MECHANICAL, INC.           
                                                            303-014         3,406                  12/11/19   12/20/19    SIRACUSA MECHANICAL, INC.           
                                                            303-015        31,893                  12/11/19   12/20/19    SIRACUSA MECHANICAL, INC.           
                                                            303-016        24,255                  11/20/20   02/04/21    SIRACUSA MECHANICAL, INC.           
                                                            303-017         9,854                  02/20/19   06/08/20    SIRACUSA MECHANICAL, INC.           
                                                            303-018         6,068                  06/03/20   07/07/20    SIRACUSA MECHANICAL, INC.           
                                                            303-019         1,728                  07/20/20   09/04/20    SIRACUSA MECHANICAL, INC.           
                                                            303-020         6,265                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            303-021        11,112                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            303-022         5,880                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            303-023           752                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            303-024         8,512                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            303-025         2,312                  12/30/20   03/03/21    SIRACUSA MECHANICAL, INC.           
                                                            303-028         2,996                  02/05/21   03/30/21    SIRACUSA MECHANICAL, INC.           
                                                            303-029        10,859                  04/02/21   05/05/21    SIRACUSA MECHANICAL, INC.           
                                                            303-030         4,172                  04/02/21   05/05/21    SIRACUSA MECHANICAL, INC.           
                                                            303-032         6,185                  06/10/21   10/21/21    Siracusa Mechanical Inc             
                                                            303-033         3,167                  06/10/21   10/21/21    Siracusa Mechanical Inc             
                                                            303-034         2,830                  06/28/21   11/16/21    Siracusa Mechanical                 
                                                            304-001        18,372                  06/03/20   07/07/20    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-001        18,372                  06/22/20   07/17/20    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-002         3,540                  11/02/20   01/22/21    NELCORP ELECTRICAL CONTRACTORS CORP.
                                                            304-004         2,230                  11/02/20   01/22/21    NELCORP ELECTRICAL CONTRACTORS CORP.
                                                            304-005         4,955                  12/30/20   03/03/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-006        34,407                  02/05/21   03/30/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-007         2,626                  02/05/21   03/30/21    NELCORP ELECTRICAL CONTRATING CORP  
                                                            304-008        18,372                  02/05/21   03/30/21    NELCORP ELECTRICAL CONTRACTING CORP 
                                                            304-009        12,552                  03/01/21   04/19/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-011        15,200                  03/01/21   04/19/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-013         2,344                  03/01/21   04/19/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-016        12,776                  04/02/21   05/05/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-017        11,699                  04/02/21   05/05/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-018         8,715                  04/02/21   05/05/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-020        11,047                  06/10/21   10/21/21    NelCorp Electrical Contracting      
                                                            304-022         3,275                  06/28/21   11/16/21    NelCorp Electrical Contracting      
                                                            304-023        15,240                  06/28/21   11/16/21    NelCorp Electrical Contracting      
                                                            304-023        15,240                  07/09/21   12/16/21    NelCorp Electrical Contracting      
                                                            306-001           846                  12/31/20   02/26/21    SYRACUSE SCENERY & STAGE LIGHTING CO
 
17-0644   Reconstruction               0-005-027  02/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-001           881                  08/22/18   09/07/18    HALE ROOFING CONTRACTORS INC        
                                                            101-002         1,200                  08/22/18   09/07/18    HALE ROOFING CONTRACTORS INC        
                                                            101-003        -7,775                  08/22/18   09/07/18    HALE ROOFING CONTRACTORS INC        
                                                            101-004       -11,737                  08/22/18   09/06/18    HALE ROOFING CONTRACTORS INC        
                                                            101-010         2,577                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-011           879                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-012           686                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-013         1,470                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-017         2,442                  01/16/19   02/11/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-019         5,862                  03/25/19   04/25/19    HALE ROOFING CONTRACTORS, INC       
                                                            101-020          -829                  03/25/19   04/25/19    HALE ROOFING CONSTRACTORS, INC      
                                                            101-021         5,789                  03/25/19   04/25/19    HALE ROOFING CONTRACTORS, INC       
                                                            101-023         4,937                  07/01/19   07/25/19    HALE ROOFING CONTRACTORS, INC.      
                                                            101-024           703                  09/11/19   09/24/19    HALE ROOFING CONTRACTORS, INC.      
                                                            105-001        29,597                  10/05/18   11/06/18    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            105-002        -5,146                  10/15/18   11/08/18    BOLANDS EXCAVATING & TOPSOIL INC    
                                                            105-003        12,559                  11/05/18   01/23/19    BOLAND'S EXCAVATING & TOPSOIL,INC.  
                                                            105-004         5,532                  10/15/18   11/08/18    BOLANDS EXCAVATING & TOPSOIL INC    
                                                            105-005        -3,629                  10/15/18   11/08/18    BOLANDS EXCAVATING & TOPSOIL INC    
                                                            105-006        29,591                  01/16/19   02/11/19    BOLAND'S EXCAVATING & TOPSOIL,INC.  
                                                            105-007        16,229                  01/16/19   02/11/19    BOLAND'S EXCAVATING & TOPSOIL,INC.  
                                                            105-008        17,447                  01/16/19   02/11/19    BOLAND'S EXCAVATING & TOPSOIL,INC.  
                                                            105-009        84,000                  04/29/19   05/29/19    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            105-010         2,419                  06/24/19   07/03/19    BOLAND'S EXCAVATING & TOPSOIL, INC  
                                                            105-011        19,988                  11/12/19   12/10/19    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            105-012         1,315                  11/12/19   12/10/19    BOLAND'S EXCAVAING & TOPSOIL, INC.  
 
19-1552   Reconstruction               0-005-028  06/01/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            501-001           950                  12/31/20   05/14/21    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            501-002         3,545                  04/02/21   05/17/21    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            501-003        -4,571                  06/28/21   03/16/22    Edger Enterprises of Elmira         
                                                            503-001        11,427                  11/23/20   02/05/21    PETCOSKY PLUMBING & HEATING, INC.   
                                                            503-002           750                  02/01/21   03/25/21    PRTCOSKY PLUMBING & HEATING, INC.   
                                                            504-001         4,595                  05/10/21   08/17/21    JOHN MILLS ELECTRIC, INC.           
 
21-0241   Reconstruction               0-005-029  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            501-001        23,840                  04/03/23   11/16/23    FREY AND CAMPBELL                   
                                                            502-001        23,840                  04/03/23   12/21/23    FREY & CAMPBELL                     
                                                            502-002        11,622                  04/03/23   12/21/23    FREY AND CAMPBELL                   
                                                            503-001        27,788                  01/17/23     /  /      DIEKOW ELECTRIC INC                 
                                                            505-003         1,229                  01/17/23   09/19/23    BOLANDS EXCAVATING & TOPSOIL        
                                                            505-004        22,449                  03/13/23   12/19/23    BOLANDS EXCAVATING & TOPSOIL INC    
                                                            505-006         6,111                  03/13/23   12/19/23    BOLANDS EXCAVATING & TOPSOIL INC    
                                                            505-007         4,804                  04/03/23   12/21/23    BOLANDS EXCAVATING AND TOPSOIL      
                                                            505-505         3,531                  03/13/23   12/19/23    BOLANDS EXCAVATING & TOPSOIL INC    
 
22-0033   Reconstruction               0-005-030  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1161FP Reconstruction               0-005-FP1  03/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maint Facility (To be Demo'd):
93-0357   Reconstruction               2-010-002  10/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0888   Reconstruction               2-010-003  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0500   Reconstruction               2-010-004  10/07/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          BusMntncFac-FutureB&G.NoBldgAid>004:
91-0568   Reconstruction               5-010-001  01/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2166   Reconstruction               5-010-003  10/24/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          4,206                  07/12/18   08/17/18    MATCO ELECTRIC CORP                 
                                                            EC001           1,996                  06/06/18   06/29/18    MATCO ELECTRIC CORP                 
 
18-0120   Reconstruction               5-010-004  12/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            305-004         2,832                  03/01/21   04/20/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
 

          Transportation Facility:
17-0937   New Construction             5-020-001  01/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               500                  05/03/19   05/07/19    BROSH MECHANICAL INC.               
                                                            002           -22,000                  05/03/19   05/07/19    BROSH MECHANICAL INC.               
                                                            201-001      -158,000                  07/01/19   07/05/19    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-002        18,599                  11/12/19   11/20/19    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-003         4,257                  11/29/19   12/05/19    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-004         7,040                  11/29/19   12/05/19    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-005           122                  02/20/20   06/04/20    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-006         6,779                  04/16/20   07/21/20    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-006         6,779                  09/09/20   11/13/20    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-007         5,608                  06/22/20   08/05/20    EGDER ENTERPRISES OF ELMIRA, INC.   
                                                            201-008        11,162                  08/24/20   11/05/20    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-009         5,959                  09/09/20   11/13/20    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-010         2,781                  09/28/20   02/09/21    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-011        10,448                  09/28/20   02/09/21    EDGER ENTERPRISESOF ELMIRA, INC.    
                                                            201-012           524                  09/28/20   02/09/21    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-013         3,710                  12/18/20   04/06/21    EGER ENTERPRISES OF ELMIRA, INC.    
                                                            201-014         3,248                  12/18/20   04/06/21    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            201-015         8,382                  12/18/20   04/06/21    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            202-003        -1,410                  09/11/19   09/13/19    BROSH MECHANICAL, INC.              
                                                            202-004         1,147                  09/25/20   11/10/20    BROSH MECHANICAL, INC.              
                                                            202-005         9,646                  10/16/20   12/29/20    BROSH MECHANICAL, INC.              
                                                            202-006           577                  10/26/20   12/31/20    BROSH MECHANICAL, INC.              
                                                            202-007         1,113                  11/10/20   01/27/21    BROSH MECHANICAL, INC.              
                                                            203-001        10,027                  07/15/19   07/17/19    SIRACUSA MECHANICAL, INC.           
                                                            203-002         1,366                  06/22/20   08/05/20    SIRACUSA MECHANICAL, INC.           
                                                            203-003        18,359                  08/24/20   10/29/20    SIRACUSA MECHANICAL, INC.           
                                                            203-004         5,003                  09/09/20   11/06/20    SIRACUSA MECHANICAL, INC.           
                                                            203-005         2,427                  09/28/20   11/06/20    SIRACUSA MECHANICAL, INC.           
                                                            203-006         4,807                  12/18/20   03/08/21    SIRACUSA MECHANICAL, INC.           
                                                            203-007         3,192                  12/18/20   03/08/21    SIRACUSA MECHANICAL, INC.           
                                                            203-008         7,587                  12/18/20   03/08/21    SIRACUSA MECHANICAL, INC.           
                                                            204-001         4,189                  02/20/20   06/08/20    KNAPP ELECTRIC, INC.                
                                                            204-002        29,402                  02/20/20   06/08/20    KNAPP ELECTRIC, INC.                
                                                            204-003         9,194                  11/09/20   01/27/21    KNAPP ELECTRIC, INC.                
                                                            204-004         6,222                  06/22/20   07/15/20    KNAPP ELECTRIC, INC.                
                                                            204-005         8,834                  07/20/20   09/04/20    KNAPP ELECTRIC, INC.                
                                                            204-006         4,498                  07/20/20   09/04/20    KNAPP ELECTRIC, INC.                
                                                            204-007        16,222                  07/20/20   09/04/20    KNAPP ELECTRIC, INC.                
                                                            204-008         2,940                  07/20/20   09/04/20    KNAPP ELECTRIC, INC.                
                                                            204-009        21,379                  09/09/20   11/06/20    KNAPP ELECTRIC, INC.                
                                                            204-010           778                  09/09/20   11/06/20    KNAPP ELECTRIC, INC.                
                                                            204-011         4,549                  09/09/20   11/06/20    KNAPP ELECTRIC, INC.                
                                                            204-012        12,901                  09/28/20   11/06/20    KNAPP ELECTRIC, INC.                
                                                            204-013        11,124                  09/28/20   11/06/20    KNAPP ELECTRIC, INC.                
                                                            204-014         1,738                  10/26/20   12/30/20    KNAPP ELECTRIC, INC.                
                                                            204-015         3,976                  11/09/20   01/27/21    KNAPP ELECTRIC, INC.                
                                                            204-016         3,382                  11/10/20   01/27/21    KNAPP ELECTRIC, INC.                
                                                            204-017         3,596                  12/18/20   03/08/21    KNAPP ELECTRIC, INC.                
                                                            205-001        17,043                  05/23/19   06/05/19    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-002        19,395                  07/01/19   07/11/19    BOLAND'S EXCAVATING & TOPSIOL, INC. 
                                                            205-003         1,475                  10/15/19   10/18/19    BOLAND'S EXCAVATING & TOPSOIL,INC.  
                                                            205-004         9,178                  09/11/19   09/13/19    BOLAND'S EXCAVATING & TOPSOIL,INC.  
                                                            205-005         9,838                  10/03/19   10/08/19    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-006        56,797                  11/12/19   11/20/19    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-007        27,410                  11/20/19   11/27/19    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-008        17,712                  07/21/20   09/21/20    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-009         1,231                  07/21/20   09/21/20    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-010        15,316                  11/09/20   03/08/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-011        17,209                  11/09/20   03/08/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-012       143,575                  11/10/20   01/28/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-013         7,822                  11/10/20   01/28/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-014        25,652                  11/09/20   03/08/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-015         6,656                  12/04/20   03/09/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
                                                            205-016        26,232                  11/10/20   01/28/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
 

          Athletic Event Facility:
18-0121   New Construction             7-019-001  12/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            301-056         9,606                  07/16/20   09/04/20    FAHS CONSTRUCTION GROUP             
                                                            301-059        11,824                  07/16/20   09/04/20    FAHS CONSTRUCTION GROUP             
                                                            301-074         3,019                  11/10/20   02/10/21    FAHS CONSTRUCTION GROUP             
                                                            301-075B          747                  11/10/20   02/10/21    FAHS CONSTRUCTION GROUP             
                                                            301-083         9,823                  11/10/20   02/10/21    FAHS CONSTRUCTION GROUP             
                                                            302-021         5,335                  07/20/20   09/04/20    SIRACUSA MECHANICAL, INC.           
                                                            302-033         3,848                  06/28/21   11/16/21    Siracusa Mechanical Inc             
                                                            304-012         1,273                  02/01/21   03/25/21    NELCORP ELECTRICAL CONTRACTING CORP.
                                                            304-019        17,732                  06/28/21   11/16/21    NelCorp Electrical                  
                                                            304-024           534                  06/28/21   11/16/21    NelCorp Electrical                  
 

          District-Wide:
07-1940   Reconstruction               7-999-003  01/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-101            793                  04/12/10   06/04/10    MATCO ELECTRIC CORPORATION          
                                                            EC-102         32,734                  04/12/10   06/04/10    MATCO ELECTRIC CORPORATION          
                                                            EC-103          2,887                  04/12/10   06/04/10    MATCO ELECTRIC CORPORATION          
                                                            EC-104          4,129                  04/12/10   06/04/10    MATCO ELECTRIC CORPORATION          
                                                            GC-101          7,462                  05/07/10   08/04/10    STREETER ASSOCIATES INC             
 
17-1026   Reconstruction               7-999-004  02/13/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         10,981                  12/10/18   01/18/19    TELE DATA COM INC.                  
                                                            EC-002         12,544                  12/10/18   01/18/19    TELE DATA COM INC.                  
                                                            EC-003         29,686                  12/10/18   01/18/19    TELE DATA COM INC.                  
                                                            EC-004         27,728                  12/10/18   01/18/19    TELE DATA COM INC.                  
                                                            EC-005           -287                  12/10/18   01/18/19    TELE DATA COM INC.                  
                                                            EC-006         18,839                  07/10/19   07/10/19    TELE DATA COM INC.                  
                                                            EC-007          9,518                  07/10/19   07/10/19    TELE DATA COM INC.                  
                                                            EC-008          3,108                  06/13/19   06/14/19    TELE DATA COM INC.                  
                                                            EC-009          1,206                  07/10/19   07/10/19    TELE DATA COM INC.                  
                                                            EC-010            484                  07/10/19   07/10/19    TELE DATA COM INC.                  
                                                            EC-011          1,116                  07/12/19   07/15/19    TELE DATA COM INC.                  
                                                            EC-012          1,475                  08/19/19   08/20/19    TELE DATA COM INC.                  
                                                            EC-013          6,474                  10/17/19   10/21/19    TELE DATA COM, INC.                 
                                                            EC-014          2,800                  11/12/19   11/20/19    TELE DATA COM INC.                  
 
21-0736   Reconstruction               7-999-005  02/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE

GEORGE JR UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-03-27-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Education Unit #1(SpecialActDistrict:
90-0595   Additions and Alterations    0-001-001  01/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1011   Reconstruction               0-001-002  03/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0818   Additions and Alterations    0-001-003  07/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0172   Additions and Alterations    0-001-005  06/26/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-E            25,200                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            1-GC          214,073                  04/26/21   05/05/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            1-HVAC         25,243                  04/26/21   05/04/21    SIRACUSA MECHANICAL, INC.           
                                                            1-P            16,762                  04/26/21   05/04/21    SIRACUSA MECHANICAL, INC.           
                                                            2-E            43,280                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            2-GC           48,003                  04/26/21   05/05/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            2-HVAC          5,308                  04/26/21   05/04/21    SIRACUSA MECHANICAL, INC.           
                                                            2-P             4,970                  04/26/21   05/04/21    SIRACUSA MECHANICAL, INC.           
                                                            3-E               700                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            3-GC           44,253                  04/26/21   05/05/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            3-HVAC         63,865                  04/26/21   05/04/21    SIRACUSA MECHANICAL, INC.           
                                                            4-E            11,600                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            4-GC           43,203                  04/26/21   05/05/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            4-HVAC         15,607                  04/26/21   05/04/21    SIRACUSA MECHANICAL, INC.           
                                                            5-E            28,050                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            5-GC            4,061                  04/26/21   05/05/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
 

          Boscowitz Gym (Special Act District):
90-0596   Reconstruction               0-002-001  01/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1012   Reconstruction               0-002-002  03/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0821   Reconstruction               0-002-003  07/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0173   Reconstruction               0-002-005  08/14/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ELEC-1          4,300                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            ELEC-2         12,300                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            ELEC-3          8,500                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            ELEC-4          4,950                  04/26/21   05/04/21    DIEKOW ELECTRIC, INC.               
                                                            GC1           146,378                  04/26/21   05/05/21    ELMIRA STRUCTURES, INC.             
                                                            GC2            58,628                  04/26/21   05/05/21    ELMIRA STRUCTURES, INC.             
                                                            GC3            40,650                  04/26/21   05/05/21    ELMIRA STRUCTURES, INC.             
                                                            GC4            27,181                  04/26/21   05/05/21    ELMIRA STRUCTURES, INC.             
                                                            GC5            27,479                  04/26/21   05/05/21    ELMIRA STRUCTURES, INC.             
                                                            GC6           -25,000                  04/26/21   05/05/21    ELMIRA STRUCTURES, INC.             
                                                            HVAC-1         25,648                  04/26/21   05/04/21    KIMBLE, INC.                        
                                                            HVAC-2         25,597                  04/26/21   05/04/21    KIMBLE, INC.                        
                                                            HVAC-3         25,306                  04/26/21   05/04/21    KIMBLE, INC.                        
                                                            PLUMB-1        24,957                  04/26/21   05/04/21    BROSH MECHANICAL, INC.              
                                                            PLUMB-2         3,715                  04/26/21   05/04/21    BROSH MECHANICAL, INC.              
 

          Education Unit #2 (SpecialActDistrct:
90-1013   Reconstruction               0-004-002  03/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0819   Reconstruction               0-004-003  07/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Martineau Center (SpecialActDistrict:
90-0597   Reconstruction               0-007-001  01/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1014   Reconstruction               0-007-002  03/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0820   Reconstruction               0-007-003  07/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Barber Medical Center:
90-0598   Reconstruction               7-003-002  01/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ewald Dining Center:
90-0599   Reconstruction               7-005-001  01/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1015   Reconstruction               7-005-002  03/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE

GROTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-05-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Junior/Senior High School:
93-1728   Reconstruction               0-002-003  08/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0152   Additions and Alterations    0-002-004  10/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0837   Reconstruction               0-002-005  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0233   Reconstruction               0-002-006  08/18/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1077   Reconstruction               0-002-007  03/31/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1275   Reconstruction               0-002-008  07/06/99  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0138   Reconstruction               0-002-009  12/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ACJ-01         10,980                  05/14/09   07/23/09    JAG ENVIRONMENTAL LLC               
                                                            ACJ-02            337                  05/29/09   07/14/09    JAG ENVIRONMENTAL LLC               
                                                            ACO-01              0                  11/20/09   01/21/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            ACO-02          2,260                  04/20/10   07/26/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            EC-01          39,522                  12/16/08   06/29/10    WEYDMAN ELECTRIC, INC.              
                                                            EC-04          37,668                  08/28/09   09/17/09    WEYDMAN ELECTRIC INC                
                                                            EC-05          59,122                  08/28/09   09/17/09    WEYDMAN ELECTRIC INC                
                                                            EC-06          17,746                  08/28/09   09/17/09    WEYDMAN ELECTRIC INC                
                                                            EC-07          47,642                  11/18/09   02/26/10    WEYDMAN ELECTRIC INC                
                                                            EC-08          28,053                  11/18/09   02/26/10    WEYDMAN ELECTRIC INC                
                                                            EC-12           6,140                  02/14/11   03/02/11    WEYDMAN ELECTRIC INC                
                                                            EC-14           4,000                  02/25/11   03/18/11    WEYDMAN ELECTRIC INC                
                                                            EC-CO-02       11,690                  04/27/09   07/28/09    WEYDMAN ELECTRIC INC                
                                                            GC-01          30,035                  03/10/09   06/08/09    Streeter Associates                 
                                                            GC-02          22,263                  03/10/09   06/08/09    Streeter Associates                 
                                                            GC-03          19,186                  03/10/09   06/08/09    Streeter Associates                 
                                                            GC-04          17,438                  03/10/09   06/08/09    Streeter Associates                 
                                                            GC-05          26,388                  03/10/09   06/08/09    Streeter Associates                 
                                                            GC-08           6,665                  11/19/09   01/21/10    STREETER ASSOCIATES INC             
                                                            GC-10          15,957                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-11          11,666                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-12          18,358                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-13           9,136                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-16          13,687                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-17           6,675                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-19          50,784                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-20          13,286                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-21          50,448                  04/27/10   07/20/10    STREETER ASSOCIATES INC             
                                                            GC-22          46,227                  04/27/10   07/20/10    STREETER ASSOCIATES INC             
                                                            GC-23          68,627                  05/05/10   07/27/10    STREETER ASSOCIATES INC             
                                                            GC-24          11,869                  05/05/10   07/27/10    STREETER ASSOCIATES INC             
                                                            GC-26          19,223                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-28          13,614                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-29          15,431                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-30          13,081                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-31          31,119                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-32           3,147                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-34          13,741                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-35          19,980                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-36          19,275                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-37-R2       19,956                  12/02/10   12/28/10    STREETER ASSOCIATES INC             
                                                            GC-38          17,947                  03/25/11   04/22/11    STREETER ASSOCIATES INC             
                                                            GC-39          18,335                  03/25/11   04/22/11    STREETER ASSOCIATES INC             
                                                            GC-40          19,763                  04/08/11   04/29/11    STREETER ASSOCIATES INC             
                                                            HC-01          11,479                  10/01/08   05/14/09    PICCIRLLI- SLAVIK & VINCENT         
                                                            HC-04           8,030                  04/19/10   07/26/10    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            HC-05           8,285                  04/19/10   07/26/10    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            HC-06           9,000                  04/19/10   07/26/10    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            HC-08          18,360                  08/03/10   09/22/10    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            HC-09           3,494                  08/03/10   09/22/10    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            HC-10          -1,767                  04/22/11   05/24/11    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            PC-06           1,660                  06/02/10   08/06/10    D'AMICO PLUMBING & HEATING CO INC   
                                                            SC-01          15,756                  12/10/09   01/21/10    BALLARD CONSTRUCTION,INC            
                                                            SC-02            -694                  03/10/09   06/08/09    W&D Smith & Sons                    
 
09-0103   Reconstruction               0-002-010  11/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         129,700                  06/23/10   08/24/10    MATCO ELECTRIC CORPORATION          
                                                            EC-02          12,285                  09/13/10   09/23/10    MATCO ELECTRIC CORPORATION          
                                                            EC-04             575                  09/13/10   09/23/10    MATCO ELECTRIC CORPORATION          
                                                            EC-05          19,811                  10/07/10   10/22/10    MATCO ELECTRIC CORPORATION          
                                                            EC-06          10,096                  03/25/11   04/22/11    MATCO ELECTRIC CORPORATION          
                                                            EC-07             839                  04/22/11   05/13/11    MATCO ELECTRIC CORPORATION          
                                                            EC-08            -206                  05/20/11   07/15/11    MATCO ELECTRIC CORPORATION          
                                                            GC-01           6,946                  09/13/10   09/23/10    STREETER ASSOCIATES INC             
                                                            GC-02          15,830                  09/13/10   09/23/10    STREETER ASSOCIATES INC             
                                                            GC-03           6,967                  02/25/11   03/18/11    STREETER ASSOCIATES INC             
                                                            GC-05-R         1,479                  05/20/11   07/15/11    STREETER ASSOCIATES INC             
                                                            GC-06          13,483                  05/20/11   07/15/11    STREETER ASSOCIATES INC             
                                                            GC-07           8,339                  05/20/11   07/15/11    STREETER ASSOCIATES INC             
                                                            GC-08           7,153                  05/20/11   07/15/11    STREETER ASSOCIATES INC             
                                                            SC-01           2,993                  06/29/11   07/15/11    LANDMARK ENTERPRISES                
 
13-0606   Reconstruction               0-002-012  05/08/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-002              0                  08/24/15   08/31/15    Matco Electric Corporation          
                                                            EC-006          2,466                  11/16/15   01/05/16    Matco Electric Corporation          
                                                            EC-007         37,960                  01/29/16   02/09/16    MATCO ELECTRIC CORPORATION          
                                                            EC-008         58,509                  07/15/16   09/29/16    MATCO ELECTRIC                      
                                                            EC-03             751                  11/16/15   09/30/16    Matco Electric Corporation          
                                                            GC-001         14,062                  07/03/15   08/05/15    Bellows Constructin Specialties LLC 
                                                            GC-003          7,211                  11/16/15   09/30/16    Bellows Construction Specialties LLC
                                                            GC-004         10,140                  11/16/15   09/30/16    Bellows Construction Specialties LLC
                                                            GC-006        206,627                  11/16/15   09/30/16    Bellows Construction Specialties LLC
                                                            GC-007         15,471                  11/27/15   01/04/16    Bellows Construction Specialties LLC
                                                            GC-008         12,157                  01/29/16   02/09/16    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            MC-002              0                  09/02/15   10/28/15    J&K Plumbing And Heating Co. Inc.   
                                                            MC-003         17,274                  01/13/16   01/27/16    J&K Plumbing and Heating Co, Inc.   
                                                            MC-01               0                  09/02/15   10/28/15    J&K Plumbing And Heating Co. Inc.   
                                                            RC-001              0                  11/23/15   01/05/16    Hale Contracting, Inc.              
                                                            RC-003              0                  11/23/15   01/05/16    Hale Contracting, Inc.              
                                                            RC-05         -35,017                  03/15/16   03/17/16    Hale Contracting, Inc.              
                                                            WC-001         10,244                  12/07/15   01/04/16    Window Specialist, Inc.             
 
13-0447   Reconstruction               0-002-013  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,330                  09/02/14   09/05/14    Panko Electrical & Maint., Inc.     
 
14-1475   Reconstruction               0-002-014  08/13/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         25,027                  06/15/15   07/03/15    Streeter Associates, Inc.           
                                                            SC-001         21,556                  06/15/15   07/03/15    LandMark Enterprises                
 
14-1281   Reconstruction               0-002-015  04/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1522   Reconstruction               0-002-016  05/19/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0348   Reconstruction               0-002-017  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             776                  03/23/17   03/24/17    J&E Electric, Inc.                  
                                                            GC-01               0                  04/17/17   06/05/17    Bacon & Seiler Constructors, Inc.   
                                                            PC-01               0                  04/17/17   04/20/17    Siracusa Mechanical, Inc.           
 
17-0092   Reconstruction               0-002-018  02/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2EC-001             0                  10/30/18   11/28/18    BILLITIER ELECTRIC INC              
                                                            2EC-002         2,217                  10/30/18   11/28/18    BILLITIER ELECTRIC INC              
                                                            2EC-005             0                  10/30/18   11/28/18    BILLITIER ELECTRIC INC              
                                                            2EC-006             0                  02/25/19   03/07/19    BILLITIER ELECTRIC, INC.            
                                                            2EC-007           424                  06/17/19   06/19/19    BILLITIER ELECTRIC, INC.            
                                                            2EC-010           921                  09/16/19   09/18/19    BILLITIER ELECTRIC, INC.            
                                                            2GC-001        35,580                  08/02/18   08/06/18    BOULEY ASSOCIATES INC               
                                                            2GC-003       -14,915                  10/30/18   01/24/19    BOULEY ASSOCIATES INC               
                                                            2GC-007        29,462                  07/01/19   10/03/19    BOULEY ASSOCIATES, INC.             
                                                            2GC006         37,528                  03/06/19   03/12/19    BOULEY ASSOCIATES, INC.             
                                                            2MC-001             0                  09/12/18   09/27/18    HMI MECHANICAL SYSTEM               
                                                            2MC-002        -3,000                  09/16/19   09/18/19    HMI MECHANICAL SYSTEMS, INC.        
                                                            2PC-001             0                  09/12/18   09/27/18    BROSH MECHANICAL                    
                                                            2PC-002             0                  10/30/18   11/28/18    BROSH MECHANICAL INC                
                                                            2PC-005             0                  11/30/18   01/07/19    BROSH MECHANICAL, INC.              
                                                            2PC-006             0                  11/30/18   01/07/19    BROSH MECHANICAL, INC.              
 
16-1621   Reconstruction               0-002-019  05/08/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0731   Reconstruction               0-002-020  03/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0515   Reconstruction               0-002-021  01/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0414FP Reconstruction               0-002-FP1  11/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary School:
96-0838   Reconstruction               0-003-004  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1078   Reconstruction               0-003-005  03/31/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1274   Reconstruction               0-003-006  07/06/99  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0139   Reconstruction               0-003-007  12/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03          61,563                  08/14/09   09/03/09    WEYDMAN ELECTRIC INC                
                                                            EC-09          18,848                  12/17/09   12/28/09    WEYDMAN ELECTRIC INC                
                                                            EC-10          16,718                  02/14/11   03/02/11    WEYDMAN ELECTRIC INC                
                                                            EC-11          10,840                  02/14/11   03/02/11    WEYDMAN ELECTRIC INC                
                                                            EC-13           3,500                  02/25/11   03/18/11    WEYDMAN ELECTRIC INC                
                                                            GC-06           3,107                  08/27/09   09/18/09    STREETER ASSOCIATES INC             
                                                            GC-07          18,795                  11/19/09   01/20/10    STREETER ASSOCIATES INC             
                                                            GC-09           7,745                  11/19/09   01/20/10    STREETER ASSOCIATES INC             
                                                            GC-14          15,409                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-15           7,459                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-18          11,064                  04/20/10   07/26/10    STREETER ASSOCIATES INC             
                                                            GC-25           4,461                  05/05/10   07/27/10    STREETER ASSOCIATES INC             
                                                            GC-27          11,026                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-33           4,608                  09/14/10   09/24/10    STREETER ASSOCIATES INC             
                                                            GC-41         -11,671                  04/08/11   04/29/11    STREETER ASSOCIATES INC             
                                                            HC-02           7,198                  08/14/09   09/03/09    PICCIRILLI-SLAVIK & VINCENT INC     
                                                            HC-03           2,699                  04/19/10   07/26/10    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            HC-07           5,923                  08/03/10   09/22/10    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            PC-01           5,712                  04/27/09   07/28/09    D'AMICO PLUMBING & HEATING CO INC   
                                                            PC-02          15,781                  08/27/09   09/18/09    D'AMICO PLUMBING & HEATING CO INC   
                                                            PC-03           7,456                  09/18/09   10/14/09    D'AMICO PLUMBING & HEATING CO INC   
                                                            PC-04          19,306                  09/18/09   10/14/09    D'AMICO PLUMBING & HEATING CO INC   
                                                            PC-05           1,530                  06/02/10   08/06/10    D'AMICO PLUMBING & HEATING CO INC   
                                                            SC-01          13,467                  12/16/08   01/22/09    W&D SMITH & SONS, INC.              
                                                            SC-03            -695                  03/10/09   06/08/09    W&D Smith & Sons                    
 
09-0104   Reconstruction               0-003-008  11/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           9,661                  09/13/10   09/23/10    MATCO ELECTRIC CORPORATION          
                                                            EC-09            -206                  05/20/11   07/15/11    MATCO ELECTRIC CORPORATION          
                                                            GC-04           2,707                  02/25/11   03/18/11    STREETER ASSOCIATES INC             
 
11-0488   Reconstruction               0-003-009  04/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -97,800                  07/05/12   07/26/13    BILLITIER ELECTRIC INC              
                                                            EC-02             583                  10/09/12   07/26/13    BILLITIER ELECTRIC INC              
                                                            SC - 06         5,040                  10/17/12   02/25/13    Boland's Excavating & Topsoil, Inc. 
                                                            SC-01          -7,000                  07/05/12   11/16/12    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            SC-02          46,250                  10/09/12   02/25/13    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            SC-03          10,600                  10/09/12   02/25/13    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            SC-04           3,026                  10/09/12   02/25/13    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            SC-05           2,485                  10/09/12   02/25/13    BOLAND'S EXCAVATING & TOPSOIL INC   
 
13-0607   Reconstruction               0-003-010  05/08/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-005          7,553                  11/16/15   01/05/16    Matco Electric Corporation          
                                                            GC-002         18,193                  08/24/15   08/31/15    Bellarus Construction Specialties   
                                                            GC-005          7,623                  11/16/15   12/21/16    Bellows Construction Specialties LLC
                                                            GC-009            598                  01/29/16   02/09/16    BELLOWS CONSTRUCTION SEPCIALTIES LLC
                                                            RC-002              0                  11/23/15   01/05/16    Hale Contracting, Inc.              
 
16-0349   Reconstruction               0-003-011  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02          -5,483                  10/26/17   11/10/17    Bacon & Seiler Constructors, Inc.   
 
17-0093   Reconstruction               0-003-012  02/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2EC-004             0                  10/30/18   11/28/18    BILLITIER ELECTRIC INC              
                                                            2EC-009         1,436                  06/17/19   06/19/19    BILLITIER ELECTRIC, INC.            
                                                            2GC-005             0                  10/30/18   01/25/19    BOULEY ASSOCIATES INC               
                                                            2MC-003       -10,418                  09/16/19   09/18/19    HMI MECHANICAL SYSTEMS, INC.        
                                                            2PC-003             0                  10/30/18   11/28/18    BROSH MECHANICAL INC                
                                                            2PC-007           -41                  02/25/19   03/07/19    BROSH MECHANICAL, INC.              
 
16-1133   Reconstruction               0-003-013  02/03/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1GC-001        23,270                  06/05/17   06/23/17    Bellows Construction Specialties, LL
                                                            1GC-002       136,618                  08/23/17   09/07/17    Bellows Construction Specialties, LL
                                                            1GC-003        25,899                  10/30/17   11/16/17    Bellows Construction Specialties, LL
                                                            1GC-004          -514                  11/06/17   11/16/17    Bellows Construction Specialties, LL
                                                            1RC-001       -51,615                  11/08/17   11/16/17    Tower Roofing Co., Inc.             
 
21-0732   Reconstruction               0-003-014  03/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0516   Reconstruction               0-003-015  01/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0415FP Reconstruction               0-003-FP1  11/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Maint. Storage:
98-1273   Additions and Alterations    5-001-004  07/06/99  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0140   Reconstruction               5-001-005  12/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-04            -695                  03/10/09   06/08/09    W&D Smith & Sons                    
 
13-0608   Reconstruction               5-001-006  05/08/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001              0                  05/07/15   06/10/15    Matco Electric Corporation          
                                                            EC-04           3,230                  11/16/15   12/21/16    Matco Electric Corporation          
 
17-0094   Reconstruction               5-001-007  02/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2EC-003             0                  10/30/18   11/28/18    BILLITIER ELECTRIC INC              
                                                            2EC-008         5,756                  06/17/19   06/19/19    BILLITIER ELECTRIC, INC.            
                                                            2GC-004        15,683                  10/30/18   01/25/19    BOULEY ASSOCIATES INC               
                                                            2PC-004         9,829           9,829  11/30/18   01/07/19    BROSH MECHANICAL, INC.              
 
22-0517   Reconstruction               5-001-008  01/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concessions/Storage:
21-0679   New Construction             7-016-001  04/01/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pressbox:
21-0750   New Construction             7-017-001  04/01/22  NO CHANGE ORDERS ON ELECTRONIC FILE

ITHACA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-06-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Lehman Alt. Community School (6-12):
93-1046   Reconstruction               0-003-004  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1443   Reconstruction               0-003-005  05/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1784   Reconstruction               0-003-006  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E4             14,232                  02/24/03   03/13/03    Richardson Bros.                    
                                                            E7a7             -625                  01/09/04   01/20/04    Richardson Bros.                    
                                                            Ele              -334                  08/20/02   10/28/02    Richardson Bros.                    
                                                            G-10           -4,216                  04/04/05   06/10/05    MCPherson Builders                  
                                                            G-11             -362                  04/18/05   06/10/05    McPherson Builders                  
                                                            G-3             1,130                  03/18/03   04/18/03    McPherson Builders                  
                                                            G1c                76                  02/10/03   02/20/03    McPherson Builders                  
 
01-0466   Reconstruction               0-003-007  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-01             -254                  11/12/03   11/21/03    Rusmar Environ.                     
                                                            E-12              565                  02/23/04   04/30/04    Matco Elec.                         
                                                            G2E-09          2,806                  02/23/04   04/13/04    Matco Elec.                         
                                                            G2E-15          1,353                  05/17/04   06/15/04    Matco Elec.                         
                                                            G2G-04          6,902                  02/23/04   03/02/04    Bouley Associates                   
                                                            G2G-09         22,867                  02/23/04   03/02/04    Bouley Associates                   
                                                            G2H-01            431                  07/08/03   07/25/03    James Lewis                         
                                                            G2H-02         14,995                  09/30/03   10/14/03    James Lewis                         
                                                            G2H-04            301                  09/30/03   10/14/03    James Lewis                         
                                                            G2H-20         11,711                  11/13/03   12/22/03    James Lewis                         
                                                            G2H-22          5,799                  01/13/04   01/26/04    James Lewis                         
                                                            G2H-26         14,427                  02/24/04     /  /      James Lewis                         
                                                            G2H-31            552                  05/17/04   06/04/04    James Lewis                         
                                                            G2P-02            180                  09/16/03   09/19/03    Buchanan Inc                        
                                                            G2R-03          1,181                  10/22/03   11/04/03    AW Farrell Roofing                  
                                                            G2R-08          1,564                  01/13/04   01/16/04    AW Farrell Roofing                  
                                                            G@E-06          6,908                  02/23/04     /  /      Matco Elec.                         
 
08-0133   Additions and Alterations    0-003-008  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-1            1,684                  12/31/09   02/12/10    RICHARDSON BROTHERS                 
                                                            EC-2            1,794                  04/29/10     /  /      RICHARDSON BROTHERS                 
                                                            EC-3           32,132                  09/07/10   09/28/10    RICHARDSON BROTHERS                 
                                                            EC-4          109,330                  10/20/10     /  /      RICHARDSON BROTHERS                 
                                                            EC-5              796                  04/04/11   04/29/11    RICHARDSON BROTHERS                 
                                                            EC-6          -31,120                  01/11/12   04/30/12    RICHARDSON BROTHERS                 
                                                            EC-7           19,496                  07/23/12   06/29/17    RICHARDSON BROTHERS                 
                                                            GC-1           27,702                  12/31/09   02/12/10    LOBAR INC                           
                                                            GC-10          10,845                  09/07/10   09/28/10    LOBAR INC                           
                                                            GC-11           1,762                  10/20/10   11/01/10    LOBAR INC                           
                                                            GC-12          15,304                  10/20/10   11/01/10    LOBAR INC                           
                                                            GC-13           2,818                  10/20/10   10/29/10    LOBAR INC                           
                                                            GC-14           5,721                  10/20/10     /  /      LOBAR INC                           
                                                            GC-15           2,049                  11/08/10   11/12/10    LOBAR INC                           
                                                            GC-16           3,898                  11/08/10   11/12/10    LOBAR INC                           
                                                            GC-17           5,299                  11/08/10   11/12/10    LOBAR INC                           
                                                            GC-18           8,166                  11/08/10   11/12/10    LOBAR INC                           
                                                            GC-19           4,521                  11/08/10   11/12/10    LOBAR INC                           
                                                            GC-2            9,827                  12/31/09   02/12/10    LOBAR INC                           
                                                            GC-20          12,181                  12/03/10   12/28/10    LOBAR INC                           
                                                            GC-21          18,561                  01/31/11   02/24/11    LOBAR INC                           
                                                            GC-22           4,331                  01/31/11   02/24/11    LOBAR INC                           
                                                            GC-23          17,160                  02/16/11   03/10/11    LOBAR INC                           
                                                            GC-24          29,338                  02/16/11   03/10/11    LOBAR INC                           
                                                            GC-25          14,174                  02/16/11   03/10/11    LOBAR, INC                          
                                                            GC-26          15,610                  02/16/11   03/10/11    LOBAR INC                           
                                                            GC-27           3,458                  02/16/11     /  /      LOBAR INC                           
                                                            GC-28          -6,638                  04/04/11   04/29/11    LOBAR INC                           
                                                            GC-29           5,799                  04/14/11   05/10/11    LOBAR INC                           
                                                            GC-3           -3,319                  04/29/10     /  /      LOBAR INC                           
                                                            GC-30           1,351                  04/14/11   05/10/11    LOBAR INC                           
                                                            GC-31           7,334                  04/14/11   05/10/11    LOBAR INC                           
                                                            GC-32           9,718                  05/02/11   05/20/11    LOBAR INC                           
                                                            GC-33           3,329                  05/02/11   05/20/11    LOBAR INC                           
                                                            GC-34          -3,075                  06/03/13   07/26/13    Lobar, Inc.                         
                                                            GC-4            6,978                  04/29/10   07/16/10    LOBAR INC                           
                                                            GC-5              603                  07/19/10   09/03/10    LOBAR INC                           
                                                            GC-6           20,552                  08/30/10   09/15/10    LOBAR, INC.                         
                                                            GC-7            6,898                  08/30/10   09/14/10    LOBAR, INC.                         
                                                            GC-8           -4,193                  09/13/10   09/28/10    LOBAR INC                           
                                                            GC-9            5,397                  09/07/10   09/28/10    LOBAR INC                           
                                                            HC-1             -328                  09/07/10   09/28/10    HMI MECHANICAL SYSTEMS              
                                                            HC-2           -3,318                  11/08/10   11/12/10    HMI MECHANICAL SYSTEMS              
                                                            HC-3          -18,492                  01/11/12   04/30/12    HMI MECHANICAL SYSTEMS              
                                                            KC-1              270                  03/08/10   05/21/10    B&W SUPPLY CO INC                   
                                                            KC-2           10,217                  08/25/10   09/13/10    B&W SUPPLY CO INC                   
                                                            KC-3           12,020                  08/25/10   09/13/10    B&W SUPPLY CO INC                   
                                                            KC-4            2,556                  12/03/10   12/28/10    B&W SUPPLY CO INC                   
                                                            KC-5              300                  04/14/11   05/10/11    B&W SUPPLY CO INC                   
                                                            PC-1           11,066                  06/28/10   09/07/10    C&S TECHNICAL RESOURCES INC         
                                                            PC-10          56,189                  07/11/12   06/29/17    C&S TECHNICAL RESOURCES INC         
                                                            PC-2            3,994                  08/30/10   09/14/10    C & S TECHNICAL RESCOURCES, INC.    
                                                            PC-3            6,470                  01/31/11   02/24/11    C&S TECHNICAL RESOURCES INC         
                                                            PC-4            1,200                  01/31/11   02/24/11    C&S TECHNICAL RESOURCES INC         
                                                            PC-5            2,141                  01/31/11   02/24/11    C&S TECHNICAL RESOURCES INC         
                                                            PC-6           22,757                  01/13/11   02/24/11    C&S TECHNICAL RESOURCES INC         
                                                            PC-7            5,195                  04/04/11   04/29/11    C&S TECHNICAL RESOURCES INC         
                                                            PC-8            9,638                  04/04/11   04/29/11    C&S TECHNICAL RESOURCES INC         
                                                            PC-9              766                  07/25/11   11/13/12    C&S TECHNICAL RESOURCES INC         
 
14-0869   Reconstruction               0-003-009  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1827   Reconstruction               0-003-010  08/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1715   Reconstruction               0-003-011  05/30/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003          2,134                  01/19/18   02/02/18    ZMK Construction, Inc.              
                                                            GC-004          3,165                  10/09/18   10/24/18    ZMK CONSTRUCTION INC                
 
20-1814   Additions and Alterations    0-003-012  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401-003          -664                  08/29/22   08/22/23    Streeter Assocs Inc                 
                                                            404-004         2,948                  06/20/23   12/27/23    MATCO ELECTRIC CORP                 
                                                            404-010         1,824                  09/12/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            404-010         1,824                  08/28/23   12/18/23    MATCO ELECTRIC CORP                 
                                                            404-014        -3,275                  09/12/23     /  /      MATCO ELECTRIC CORP                 
                                                            404-014        -3,275                  08/28/23   12/18/23    MATCO ELECTRIC CORP                 
                                                            409-004         1,775                  09/12/23   12/28/23    DAY AUTOMATION                      
 

          Enfield Elem School (K-5):
93-1047   Reconstruction               0-004-007  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0467   Reconstruction               0-004-009  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2E-03          9,887                  10/22/03   11/04/03    Matco Elec.                         
                                                            G2E-07            576                  02/23/04     /  /      Matco Elec.                         
                                                            G2E-11         11,250                  02/23/04   04/30/04    Matco Elec.                         
                                                            G2H-18          1,489                  11/13/03   12/22/03    James Lewis                         
                                                            G2R-01         33,556                  09/30/03   10/14/03    AW Farrell Roofing                  
                                                            G2R-02         18,035                  10/22/03   11/04/03    AW Farrell Roofing                  
                                                            G2R-06          3,296                  01/13/04   01/16/04    AW Farrell Roofing                  
                                                            G2R-09            662                  05/17/04   06/04/04    AW Farrell Roofing                  
 
03-1591   Reconstruction               0-004-010  06/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0388   Additions and Alterations    0-004-011  03/17/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            1,106                  11/14/11   01/30/12    SHISLER ELECTRIC CONTRACTOR INC     
                                                            EC-2            2,076                  01/11/12   07/16/12    SHISLER ELECTRICA CONTRACTORS INC   
                                                            EC-3            3,191                  12/03/10   01/06/11    BLANDING ELECTRIC                   
                                                            EC-3             -192                  02/03/14   04/04/14    SHISLER ELECTRIC CONT INC           
                                                            EC-4            2,547                  04/29/11   05/17/11    BLANDING ELECTRIC                   
                                                            EC-6           -1,837                  03/05/12   09/07/12    BLANDING ELECTRIC                   
                                                            GC-1             -300                  11/14/11   03/16/12    DIAMOND & THIEL CONSTRUCTION        
                                                            GC-2            9,557                  04/29/10   07/19/10    EDGER ENTERPRISES OF ELMIRA         
                                                            GC-2           -3,367                  01/11/12   05/07/12    DIAMOND & THIEL CONSTRUCTION        
                                                            GC-3           26,320                  12/03/10   01/06/11    EDGER ENTERPRISES OF ELMIRA         
                                                            HC-1            7,759                  12/17/09   01/13/10    KIMBLE INC                          
                                                            HVAC-01         3,014                  03/28/12     /  /      CLIMATE CONTROL TECHNOLOGIES INC    
                                                            HVAC-02          -396                  04/30/12   09/07/12    CLIMATE CONTROL TECHNOLOGIES INC    
                                                            PC-2           23,564                  04/29/10   07/19/10    FREY & CAMPBELL INC                 
                                                            PC-3            9,659                  04/29/10   07/19/10    FREY & CAMPBELL INC                 
                                                            PC-4           16,368                  03/04/11   05/20/11    FREY & CAMPBELL INC                 
                                                            PC-5           13,797                  04/29/11   05/17/11    FREY & CAMPBELL INC                 
                                                            PC-7           -2,043                  04/29/11   05/17/11    FREY & CAMPBELL INC                 
                                                            SC-1           14,786                  01/28/10   03/01/10    BOLAND'S EXCAVATING & TOPSOIL       
                                                            SC-2           -8,091                  02/01/10   03/16/10    BOLAND'S EXCAVATING                 
 
14-0870   Reconstruction               0-004-012  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0109   Reconstruction               0-004-013  10/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1815   Reconstruction               0-004-014  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            404-001         2,314                  08/29/22   09/07/23    Matco Elec Corp                     
                                                            404-007        28,112                  06/20/23   12/27/23    MATCO ELECTRIC CORP                 
                                                            404-013         5,469                  09/12/23     /  /      MATCO ELECTRIC CORP                 
                                                            404-013         5,469                  08/28/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            404-016         5,243                  09/12/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            404-016         5,243                  09/12/23   12/28/23    MATCO ELEC CORP                     
                                                            404-017         1,034                  09/12/23   12/28/23    MATCO ELEC CORP                     
 
21-1989   Reconstruction               0-004-015  10/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0327   Reconstruction               0-004-016  01/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0395FP Reconstruction               0-004-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sherman Elem School(K-5) (see0-028):
90-0862   Reconstruction               0-007-005  03/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1048   Reconstruction               0-007-006  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1785   Reconstruction               0-007-007  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1a             1,326                  08/20/02   10/28/02    Richardson Bros.                    
                                                            E7a1            3,773                  01/09/04   01/20/04    Richardson Bros.                    
 
01-0468   Reconstruction               0-007-008  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-02            3,470                  11/12/03   11/21/03    Rusmar Environ.                     
                                                            G2E-01          6,730                  10/22/03   11/05/03    Matco Elec.                         
                                                            G2E-10          2,353                  02/23/04     /  /      Matco Elec.                         
                                                            G2E-13            920                  03/26/04   04/08/04    Matco Elec.                         
                                                            G2E-14          1,082                  05/17/04   06/15/04    Matco Elec.                         
                                                            G2G-05         28,136                  02/23/04   03/02/04    Bouley Associates                   
                                                            G2G-07         22,096                  02/23/04   03/02/04    Bouley Associates                   
                                                            G2H-03          2,472                  09/30/03   10/14/03    James Lewis                         
                                                            G2H-08         12,790                  11/13/03   12/22/03    James Lewis                         
                                                            G2H-21          7,941                  01/13/04   01/26/04    James Lewis                         
                                                            G2H-24         21,648                  02/24/04     /  /      James Lewis                         
                                                            G2H-28            375                  02/24/04   03/05/04    James Lewis                         
                                                            G2H-30          4,025                  05/17/04   06/04/04    James Lewis                         
                                                            G2P-01            180                  09/30/03   10/14/03    Buchanan Inc                        
                                                            G2R-05          1,812                  01/13/04   01/16/04    AW Farrell Roofing                  
                                                            G2R-10            906                  10/14/05   10/31/05    A.W. FARRELL ROOFING SERVICES       
 
09-1141   Additions and Alterations    0-007-009  08/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           7,277                  11/21/11   05/15/12    BLANDING ELECTRIC                   
                                                            EC-02           1,306                  12/15/11   04/12/12    BLANDING ELECTRIC                   
                                                            EC-03             605                  03/28/12   08/22/12    BLANDING ELECTRIC                   
                                                            GC-01           6,008                  03/04/11   03/25/11    DANIEL J LYNCH                      
                                                            GC-02          43,220                  03/04/11   03/25/11    DANIEL J LYNCH                      
                                                            GC-03          13,578                  08/01/11   09/07/11    DANIEL J LYNCH                      
                                                            GC-04           4,981                  08/01/11   09/07/11    DANIEL J LYNCH                      
                                                            GC-05           4,214                  08/01/11   09/07/11    DANIEL J LYNCH                      
                                                            GC-06          -5,443                  09/26/11   11/01/11    DANIEL J LYNCH                      
                                                            GC-07          17,797                  10/31/11   01/06/12    DANIEL J LYNCH                      
                                                            GC-08          54,468                  02/21/12   08/07/12    DANIEL J LYNCH                      
                                                            GC-09         -22,546                  09/26/12   01/25/13    DANIEL J LYNCH                      
                                                            HVAC-01        -8,153                  03/05/12   08/29/12    HMI MECHANICAL SYSTEMS              
                                                            HVAC-01         3,014                  03/28/12   09/07/12    CLIMATE CONTROL TECH., INC.         
                                                            PC-01           5,222                  09/23/11   04/11/12    JAMES L LEWIS INC                   
                                                            PC-02           2,787                  09/23/11   11/09/11    JAMES L LEWIS INC                   
                                                            PC-03           9,110                  09/23/11   04/11/12    JAMES L LEWIS INC                   
                                                            PC-04           2,389                  10/24/11   05/14/12    JAMES L LEWIS INC                   
                                                            PC-05           4,127                  10/31/11   05/15/12    JAMES L LEWIS INC                   
                                                            PC-07           2,863                  07/11/12   07/29/13    JAMES L LEWIS INC                   
 
11-1318   Additions and Alterations    0-007-010  10/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-001           -944                  08/02/13   08/27/13    Streeter Associates, Inc.           
                                                            GC-002            208                  08/02/13   08/27/13    Streeter Associates, Inc.           
                                                            GC-003           -723                  08/02/13   08/27/13    Street Associates, Inc.             
                                                            GC-004         11,775                  08/02/13   08/27/13    Streeter Associates, Inc.           
                                                            GC-005         11,901                  08/30/13   09/09/13    Streeter Associates, Inc.           
                                                            GC-006         -5,722                  04/07/14   04/30/14    Streeter Associates, Inc.           
 
14-0871   Reconstruction               0-007-011  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0110   Reconstruction               0-007-012  10/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1816   Reconstruction               0-007-013  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            404-006        34,999                  06/20/23   12/27/23    MATCO ELECTRIC                      
                                                            409-002        22,343                  04/03/23   12/21/23    DAY AUTOMATION SYS.                 
 

          Cayuga Heights Elem.(K-5):
93-1049   Reconstruction               0-011-001  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1786   Reconstruction               0-011-002  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1c                81                  08/20/02   10/28/02    Richardson Bros.                    
                                                            E7a3             -625                  01/09/04   01/20/04    Richardson Bros.                    
 
01-0469   Reconstruction               0-011-003  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2H-11            420                  11/13/03   12/22/03    James Lewis                         
 
07-1818SR Reconstruction               0-011-004  03/20/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0196   Reconstruction               0-011-004  03/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           14,635                  04/19/10   07/28/10    MATCO ELECTRIC CORP                 
                                                            EC-2            4,366                  11/09/09   12/08/09    MATCO ELECTRIC CORP                 
                                                            EC-3            2,841                  01/31/11   02/24/11    MATCO ELECTRIC CORP                 
                                                            EC-5           11,456                  03/17/11   04/01/11    MATCO ELECTRIC CORP                 
                                                            EC-8            2,368                  04/29/11   05/20/11    MATCO ELECTRIC CORP                 
                                                            GC-3           53,956                  01/31/11   02/24/11    MCPHERSON BUILDERS INC              
                                                            GC-7           -1,346                  09/21/12   01/24/13    MCPHERSON BUILDERS INC              
                                                            HVAC-2           -562                  03/17/11   04/01/11    KIMBLE INC                          
                                                            HVAC-4          1,566                  09/01/11   12/29/11    KIMBLE INC.                         
                                                            HVAC-5        -22,006                  02/03/14   02/24/14    KIMBLE INC                          
                                                            SC-1          -15,247                  06/22/09   08/04/09    BOTHAR CONSTRUCTION LLC             
                                                            SC-12           3,710                  03/17/11   04/01/11    BOTHAR CONSTRUCTION LLC             
                                                            SC-3            3,076                  12/31/09   02/12/10    BOTHAR CONSTRUCTION LLC             
                                                            SC-6            8,135                  02/25/10   03/19/10    BOTHAR CONSTRUCTION LLC             
                                                            SC-7            1,383                  05/24/10   08/05/10    BOTHAR CONSTRUCTION LLC             
                                                            SC-8            2,940                  05/24/10   08/05/10    BOTHAR CONSTRUCTION LLC             
                                                            SC-9           22,951                  08/30/10   09/14/10    BOTHAR CONSTRUCTION, LLC            
 
11-0753   Reconstruction               0-011-005  04/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001            700                  10/11/12   07/26/13    BILLITIER ELECTRIC INC              
                                                            EC-002            464                  10/11/12   07/26/13    BILLITIER ELECTRIC INC              
                                                            EC-003           -454                  02/22/13   07/26/13    BILLITIER ELECTRIC INC              
                                                            GC-001          1,704                  10/19/12   02/15/13    J & B Installations, Inc.           
                                                            GC-002          4,444                  01/28/13   04/26/13    J&B INSTALLATIONS INC               
                                                            GC-003          4,351                  01/28/13   04/26/13    J&B INSTALLATIONS INC               
                                                            HC-001            744                  11/13/12   07/26/13    Kimble, Inc.                        
                                                            HC-002          2,793                  01/18/13   07/26/13    KIMBLE INC                          
 
14-0872   Reconstruction               0-011-006  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1826   Reconstruction               0-011-007  08/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1783   Reconstruction               0-011-008  06/11/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          5,642                  11/18/19   12/10/19    EDGER ENTERPRISES, INC.             
                                                            GC-002            643                  11/18/19   12/10/19    EDGER ENTERPRISES, INC.             
 
19-0111   Reconstruction               0-011-010  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-003        10,021                  11/22/21   12/22/22    Welliver McGuire Inc                
                                                            101-012           159                  07/18/23   05/09/23    Welliver                            
 
18-1898   Reconstruction               0-011-011  05/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01            -927                  01/06/20   02/13/20    MARCHUSKA BROTHERS CONSTRUCTION,LLC 
                                                            GC-02           2,840                  03/13/20   07/06/20    MARCHUSKA BROTHERS CONSTRUCTION,LLC 
 
02-0394FP Reconstruction               0-011-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Beverly Martin Elementary:
91-0303   Reconstruction               0-012-004  10/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1050   Reconstruction               0-012-005  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0470   Reconstruction               0-012-007  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2E-05          6,734                  02/23/04   03/05/04    Matco Elec.                         
                                                            G2E-08          2,375                  08/26/04   09/23/04    Matco Elec.                         
                                                            G2G-01            460                  05/05/03   05/07/03    Bouley Associates                   
                                                            G2G-02         12,064                  09/16/03   09/19/03    Bouley Associates                   
                                                            G2G-08         -1,695                  02/23/04   03/02/04    Bouley Associates                   
                                                            G2H-05            909                  09/30/03   10/14/03    James Lewis                         
                                                            G2H-19            727                  11/13/03   12/22/03    James Lewis                         
                                                            G2H-25          5,938                  02/24/04     /  /      James Lewis                         
 
07-0950   Reconstruction               0-012-008  04/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-6            1,000                  12/11/09   02/05/10    SUNSTREAM CORPORATION               
                                                            EC-4            2,691                  04/27/09   08/07/09    RICHARDSON BROTHERS                 
                                                            EC-8            3,694                  08/17/09   11/12/09    RICHARDSON BROTHERS                 
                                                            EC-9            2,237                  09/07/10   09/27/10    RICHARDSON BROTHERS                 
                                                            GC-12           2,524                  12/31/09   02/02/10    LOBAR INC                           
                                                            GC-18          17,929                  08/25/10   09/13/10    FREY & CAMPBELL INC                 
                                                            GC-2            4,036                  02/02/09   07/02/09    LOBAR INC                           
                                                            GC-22           4,828                  08/30/10   09/28/10    LOBAR, INC.                         
                                                            GC-7            7,343                  11/09/09   12/08/09    LOBAR INC                           
                                                            HC-13          14,488                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-14          11,024                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-22          58,968                  04/04/11   05/16/11    FREY & CAMPBELL INC                 
                                                            HC-24           9,280                  04/04/11   05/13/11    FREY & CAMPBELL INC                 
                                                            HC-27           9,085                  03/15/12   09/07/12    FREY & CAMPBELL INC                 
                                                            HC-3           81,257                  08/17/09     /  /      FREY & CAMPBELL INC                 
                                                            HC-32          57,223                  06/04/12   12/13/12    FREY & CAMPBELL INC                 
                                                            HC-5            2,118                  10/26/09   11/30/09    FREY & CAMPBELL INC                 
                                                            HC-6            8,657                  12/11/09   02/05/10    FREY & CAMPBELL INC                 
                                                            HC-9           11,838                  03/26/10   05/10/10    FREY & CAMPBELL INC                 
                                                            SW-10           4,849                  01/30/12   07/16/12    EDGER ENTERPRISES INC               
                                                            SW-4            5,786                  10/22/09   11/30/09    EDGER ENTERPRISES INC               
                                                            SW-5           10,200                  12/11/09   02/05/10    EDGER ENTERPRISES INC               
                                                            SW-6            5,500                  12/31/09   02/02/10    EDGER ENTERPRISES INC               
 
08-0101   Reconstruction               0-012-009  04/22/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3            4,616                  11/19/09   01/15/10    RICHARDSON BROTHERS                 
                                                            EC-5              467                  03/08/10   05/21/10    RICHARDSON BROTHERS                 
                                                            EC-6              720                  03/08/10   05/21/10    RICHARDSON BROTHERS                 
                                                            EC-7            3,606                  03/08/10   05/21/10    RICHARDSON BROTHERS                 
                                                            EC-8            7,212                  03/08/10   05/21/10    RICHARDSON BROTHERS                 
                                                            GC-10          14,081                  12/31/09   02/05/10    LOBAR INC                           
                                                            GC-15           4,337                  05/17/10   07/28/10    LOBAR INC                           
                                                            GC-9            3,405                  12/31/09   02/05/10    LOBAR INC                           
                                                            HC-11           6,136                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-17          -2,060                  04/04/11   04/29/11    FREY & CAMPBELL INC                 
 
14-0873   Reconstruction               0-012-010  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1784   Reconstruction               0-012-011  06/11/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003          7,841                  11/18/19   12/10/19    EDGER ENTERPRISES, INC.             
 
19-0112   Reconstruction               0-012-013  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-00          5,684                  03/23/22   04/20/23    Welliver McGuire Inc                
                                                            101-007         1,269                  03/23/22   04/20/23    Welliver McGuire Inc                
                                                            101-011        44,608                  06/21/22   05/01/23    Welliver McGuire Inc                
                                                            104-011        25,845                  09/03/21   05/24/22    MATCO ELECTRIC CORP                 
                                                            104-015        -1,155                  10/04/21   11/22/22    Matco Electric Corporation          
                                                            104-022           844                  11/22/21   12/14/22    Matco Electric Corp                 
                                                            104-024        17,899                  02/14/22   02/13/23    Matco Elec Corp                     
                                                            104-027         1,519                  02/14/22   02/13/23    Matco Elec Corp                     
                                                            104-029         9,806                  03/23/22   04/04/23    Matco Elec Corp                     
                                                            104-031         2,876                  06/06/22   04/06/23    Matco Elec Corp                     
                                                            110-001         1,460                  11/01/21   09/06/22    Day Automation                      
 
22-0328   Reconstruction               0-012-014  01/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fall Creek Elem School(K-5):
92-1239   Reconstruction               0-013-002  07/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1051   Reconstruction               0-013-003  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1787   Reconstruction               0-013-004  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E5              1,299                  02/24/03   03/13/03    Richardson Bros.                    
                                                            E7a4             -625                  01/09/04   01/20/04    Richardson Bros.                    
                                                            Eld               812                  08/20/02   10/28/02    Richardson Bros.                    
                                                            G-2               231                  03/18/03   04/18/03    McPherson Builders                  
                                                            G1B               146                  02/10/03   02/20/03    McPherson Builders                  
 
01-0471   Reconstruction               0-013-005  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2H-13            474                  11/13/03   12/22/03    James Lewis                         
 
08-0462   Reconstruction               0-013-006  03/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           14,475                  12/11/09   02/12/10    BLANDING ELECTRIC                   
                                                            EC-2            2,547                  12/03/10   12/28/10    BLANDING ELECTRIC                   
                                                            EC-5           -5,741                  03/05/12   09/07/12    BLANDING ELECTRIC                   
                                                            GC-1            8,869                  04/19/10   07/28/10    EDGER ENTERPRISES OF ELMIRA         
                                                            GC-4            7,661                  11/24/10   12/16/10    EDGER ENTERPRISES OF ELMIRA         
                                                            GC-5            5,261                  12/03/10   12/28/10    EDGER ENTERPRISES OF ELMIRA         
                                                            GC-6            3,468                  12/03/10   12/28/10    EDGER ENTERPRISES OF ELMIRA         
                                                            GC-7           -3,258                  12/15/11   03/30/12    EDGER ENTERPRISES OF ELMIRA INC     
                                                            HC-2           -1,276                  04/19/10   07/28/10    KIMBLE INC                          
                                                            HC-3           22,193                  12/03/10   12/28/10    KIMBLE INC                          
                                                            HC-4           15,794                  03/17/11   04/01/11    KIMBLE INC                          
                                                            HC-5            1,712                  08/01/11   11/09/11    KIMBLE INC                          
                                                            PC-1            5,945                  04/19/10   07/28/10    FREY & CAMPBELL INC                 
                                                            PC-6           -1,547                  03/17/11   04/01/11    FREY & CAMPBELL INC                 
                                                            RC-1           13,513                  01/15/10   02/19/10    DIAMOND ROOFING                     
                                                            RC-2              830                  11/24/10   12/16/10    DIAMOND ROOFING                     
                                                            RC-3           -3,149                  12/15/11   03/30/12    DIAMOND ROOFING                     
 
14-0874   Reconstruction               0-013-007  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1494   Reconstruction               0-013-008  06/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0113   Reconstruction               0-013-009  10/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          South Hill Elem School(K-5):
93-1052   Reconstruction               0-014-005  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0472   Reconstruction               0-014-007  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-G2R11        3,000                  10/14/05   10/31/05    A.W. FARRELL ROOFING SERVICES       
                                                            G2G-03          2,962                  09/30/03   10/14/03    Bouley Assoc.                       
                                                            G2G-06          1,627                  02/23/04   03/02/04    Bouley Assoc.                       
                                                            G2H-07          2,725                  09/30/03   10/14/03    James Lewis                         
                                                            G2H-15            423                  11/13/03   12/22/03    James Lewis                         
                                                            G2R-07            906                  01/13/04   01/16/04    AW Farrell Roofing                  
 
09-0308   Reconstruction               0-014-008  04/02/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          2,394                  03/04/11   03/25/11    RICHARDSON BROTHERS                 
                                                            EC-005         -2,491                  03/20/12   09/07/12    RICHARDSON BROTHERS                 
                                                            GC-001         -9,220                  09/26/12   01/25/13    MASSA CONSTRUCTION INC              
                                                            MC-001          8,532                  11/01/10   12/01/10    FREY & CAMPBELL INC                 
                                                            MC-002         13,997                  10/24/11   12/22/11    FREY & CAMPBELL INC                 
                                                            MC-004        -30,385                  03/05/12   09/07/12    FREY & CAMPBELL INC                 
 
14-0875   Reconstruction               0-014-009  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0114   Reconstruction               0-014-010  10/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1817   Additions and Alterations    0-014-011  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401-004        -1,064                  08/29/22   08/22/23    Streeter Assocs Inc                 
                                                            401-006        -2,488                  05/08/23   12/22/23    STEETER ASSOCIATES                  
                                                            402-002           934                  04/03/23   12/21/23    SIRACUSA MECHANICAL                 
                                                            409-001         4,248                  01/09/23   06/15/23    Day Automation Systems, Inc.        
 
21-0851   Reconstruction               0-014-012  06/02/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0390FP Reconstruction               0-014-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School(9-12):
93-1053   Reconstruction               0-015-006  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1172   Additions and Alterations    0-015-007  05/02/97  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0897   Reconstruction               0-015-008  03/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0956   Reconstruction               0-015-009  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0473   Reconstruction               0-015-010  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2H-23         22,301          21,804  01/13/04   09/23/04    James L Lewis                       
                                                            G2R-12           -134                  12/23/05   12/28/05    AW Farrell Roofing                  
                                                            G3E-05            720                  05/17/04   06/04/04    Richardson Bros. Elec.              
                                                            G3G-02          5,238                  02/24/04   03/04/04    Bouley Associates                   
                                                            G3G-06            500                  02/24/03   03/02/04    Bouley Associates                   
                                                            G3P-01          5,394                  07/17/03   07/25/03    Louis Picciano                      
                                                            G3P-02          3,477                  09/30/03   10/14/03    Louis Picciano                      
                                                            G3P-06          5,065                  11/12/03   12/22/03    Louis Picciano                      
 
00-1788   Reconstruction               0-015-011  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E2 Rev1         1,615                  03/13/03   04/18/03    Richardson Bros.                    
                                                            E6              3,018                  09/30/03   10/14/03    Richardson Bros.                    
                                                            E7a8              -23                  01/09/04   01/20/04    Richardson Bros.                    
                                                            E8               -602                  01/09/04   01/20/04    Richardson Bros.                    
                                                            G-4             2,372                  03/18/03   04/18/03    McPherson Builders                  
                                                            G1D                60                  02/10/03   04/18/06    McPherson Builders                  
 
04-1324   Reconstruction               0-015-012  07/05/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            -5,643                  04/07/06   07/26/06    Weathermaster Roofing Co            
 
05-0023   Reconstruction               0-015-013  09/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,565                  12/07/06   01/19/07    Syracuse Scenery and stage          
                                                            1               2,958                  12/07/06   03/09/07    Blanding Electric                   
 
05-0669   Reconstruction               0-015-014  05/02/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          3,186                  10/04/06   01/09/07    McPherson Builders                  
                                                            GC-002          1,155                  12/11/06   01/24/07    McPherson Builders                  
 
05-0553   Reconstruction               0-015-015  04/13/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02              2,400                  09/01/06   10/13/06    Paul Vitale Inc                     
 
05-0860   Reconstruction               0-015-016  03/31/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               755                  11/16/06   12/28/06    J and B Installations               
 
08-0193   Additions and Alterations    0-015-017  02/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           11,450                  11/09/09   12/31/09    RICHARDSON BROTHERS                 
                                                            EC-10           3,709                  01/31/11   02/25/11    RICHARDSON BROTHERS                 
                                                            EC-11          -4,443                  03/05/12   09/07/12    RICHARDSON BROTHERS                 
                                                            EC-2            4,454                  11/09/09   12/23/09    RICHARDSON BROTHERS                 
                                                            EC-3            7,749                  02/17/10   04/27/10    RICHARDSON BROTHERS                 
                                                            EC-4            6,936                  05/05/10   08/04/10    RICHARDSON BROTHERS                 
                                                            EC-5           20,824                  07/26/10   09/13/10    RICHARDSON BROTHERS                 
                                                            EC-6            4,419                  09/24/10   10/04/10    RICHARDSON BROTHERS                 
                                                            EC-7           49,249                  09/24/10   10/04/10    RICHARDSON BROTHERS                 
                                                            EC-8            4,704                  09/24/10   10/04/10    RICHARDSON BROTHERS                 
                                                            EC-9            4,335                  01/31/11   02/25/11    RICHARDSON BROTHERS                 
                                                            GC-1           81,669                  11/09/09   07/21/10    EDGER ENTERPRISES INC               
                                                            GC-10           7,423                  09/24/10   10/04/10    EDGER ENTERPRISES INC               
                                                            GC-11          29,568                  02/16/11   03/03/11    EDGER ENTERPRISES INC               
                                                            GC-12          61,500                  02/16/11     /  /      EDGER ENTERPRISES INC               
                                                            GC-13           1,992                  01/31/11   02/25/11    EDGER ENTERPRISES INC               
                                                            GC-14           1,493                  02/16/11   03/03/11    EDGER ENTERPRISES INC               
                                                            GC-15           2,659                  04/04/11   05/13/11    EDGER ENTERPRISES INC               
                                                            GC-16           3,191                  04/04/11   05/13/11    EDGER ENTERPRISES INC               
                                                            GC-17           2,472                  04/04/11   05/13/11    EDGER ENTERPRISES INC               
                                                            GC-18           6,683                  05/13/11   06/07/11    EDGER ENTERPRISES INC               
                                                            GC-19          14,162                  05/13/11   06/07/11    EDGER ENTERPRISES INC               
                                                            GC-2          193,307                  12/11/09   02/04/10    EDGER ENTERPRISES INC               
                                                            GC-20           5,934                  07/25/11   08/12/11    EDGER ENTERPRISES INC               
                                                            GC-21           8,405                  06/27/11   07/18/11    EDGER ENTERPRISES INC               
                                                            GC-22          26,748                  08/31/11   10/03/11    EDGER ENTERPRISES INC               
                                                            GC-23          49,600                  05/24/12   10/09/12    EDGER ENTERPRISES INC               
                                                            GC-24          -3,569                  01/11/12   05/07/12    EDGER ENTERPRISES INC               
                                                            GC-25          45,849                  01/11/12   05/07/12    EDGER ENTERPRISES INC               
                                                            GC-26          16,802                  09/26/12   02/25/13    EDGER ENTERPRISES INC               
                                                            GC-3           23,050                  12/11/09   02/08/10    EDGER ENTERPRISES, INC.             
                                                            GC-4           16,112                  01/26/10   03/04/10    EDGER ENTERPRISES INC               
                                                            GC-5          106,575                  06/28/10   09/10/10    EDGER ENTERPRISES INC               
                                                            GC-6            1,892                  08/25/10   09/13/10    EDGER ENTERPRISES INC               
                                                            GC-7            2,587                  09/24/10   10/04/10    Edger Enterprises Inc               
                                                            GC-8            6,929                  09/07/10   09/27/10    EDGER ENTERPRISES INC               
                                                            GC-9            2,050                  09/24/10   10/04/10    EDGER ENTERPRISES INC               
                                                            HC-1            8,810                  12/11/09   01/25/10    JAMES L LEWIS INC                   
                                                            HC-2            2,290                  07/26/10   09/13/10    JAMES L LEWIS INC                   
                                                            HC-3          -14,366                  04/04/11     /  /      JAMES L LEWIS INC                   
                                                            HC-4             -355                  05/13/11   06/07/11    JAMES L LEWIS INC                   
                                                            HC-5           -4,217                  05/27/11   06/17/11    JAMES L LEWIS INC                   
                                                            PC-1            4,099                  09/24/10   10/04/10    JAMES L LEWIS INC                   
                                                            PC-2            2,247                  01/31/11   02/25/11    JAMES L LEWIS INC                   
                                                            PC-3            1,026                  01/31/11   02/25/11    JAMES L LEWIS INC                   
                                                            SC-2           51,450                  08/31/11   01/03/12    AV SOLUTIONS                        
                                                            SC-3          -13,081                  03/05/12   09/07/12    AV SOLUTIONS                        
                                                            SOUND-1           510                  12/03/10   01/06/11    AV SOLUTIONS                        
                                                            THEATRE1      -10,000                  01/31/11   02/25/11    BMI SUPPLY                          
 
09-1390   Additions and Alterations    0-015-018  09/28/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC - 10        -1,230                  12/03/12   12/31/13    Richardson Brothers                 
                                                            EC - 11         7,438                  12/03/12   12/31/13    Richardson Brothers                 
                                                            EC-01          17,322                  05/13/11   07/13/11    RICHARDSON BROTHERS                 
                                                            EC-02          15,434                  08/01/11   10/21/11    RICHARDSON BROTHERS                 
                                                            EC-03           7,131                  09/15/11   08/03/12    RICHARDSON BROTHERS                 
                                                            EC-04          24,912                  09/15/11   08/03/12    RICHARDSON BROTHERS                 
                                                            EC-05          48,538                  09/15/11   08/03/12    RICHARDSON BROTHERS                 
                                                            EC-07          48,849                  12/15/11   06/18/19    RICHARDSON BROTHERS                 
                                                            EC-08          -8,336                  03/05/12   05/30/13    RICHARDSON BROTHERS                 
                                                            EC-09           8,759                  04/30/12   09/05/12    RICHARDSON BROTHERS                 
                                                            EC-6           28,810                  11/21/11   09/28/12    RICHARDSON BROTHERS                 
                                                            GC-01         162,397                  06/06/11   07/13/11    FAHS CONSTRUCTION                   
                                                            GC-02          69,345                  06/06/11   07/13/11    FAHS CONSTRUCTION                   
                                                            GC-03           1,733                  03/17/11   04/01/11    FAHS CONSTRUCTION                   
                                                            GC-03           1,733                  06/06/11   07/13/11    FAHS CONSTRUCTION                   
                                                            GC-04          87,495                  06/06/11   07/13/11    FAHS CONSTRUCTION                   
                                                            GC-05          47,097                  08/01/11   09/02/11    FAHS CONSTRUCTION                   
                                                            GC-06          -8,125                  09/26/11   11/01/11    FAHS CONSTRUCTION                   
                                                            GC-07         181,483                  09/19/11   01/12/12    FAHS CONSTRUCTION                   
                                                            GC-08         111,509                  09/19/11     /  /      FAHS CONSTRUCTION                   
                                                            GC-09          30,882                  09/19/11   12/20/11    FAHS CONSTRUCTION                   
                                                            GC-10         140,275                  11/21/11   04/11/12    FAHS CONSTRUCTION                   
                                                            GC-11          98,541                  11/21/11   03/30/12    FAHS CONSTRUCTION                   
                                                            GC-12           7,609                  12/15/11   03/30/12    FAHS CONSTRUCTION                   
                                                            GC-13          32,279                  01/23/12   04/13/12    FAHS CONSTRUCTION                   
                                                            GC-14          -1,570                  03/28/12   08/31/12    FAHS CONSTRUCTION                   
                                                            GC-15          43,354                  04/30/12   10/23/12    FAHS CONSTRUCTION                   
                                                            GC-16          59,612                  03/13/13   06/18/13    FAHS CONSTRUCTION                   
                                                            GC-17           5,199                  03/13/13   06/18/13    FAHS CONSTRUCTION                   
                                                            GC-18          10,000                  03/15/13   06/18/13    FAHS CONSTRUCTION                   
                                                            GC-19            -432                  03/15/13   06/18/13    FAHS CONSTRUCTION                   
                                                            GC-20          -2,000                  03/13/13   06/18/13    FAHS CONSTRUCTION                   
                                                            GC-21            -235                  08/19/13   09/19/13    Fahs Construction                   
                                                            HVAC-01        -6,252                  06/27/11   07/27/11    JAMES L LEWIS INC                   
                                                            HVAC-02        15,824           2,373  09/15/11   08/03/12    JAMES L LEWIS, INC                  
                                                            HVAC-03        21,818           3,727  09/15/11   08/03/12    JAMES L LEWIS INC                   
                                                            HVAC-04        12,754          12,754  09/15/11   Disapproved JAMES L LEWIS INC                   
                                                            HVAC-05       -40,243                  09/26/12   12/31/13    JAMES L LEWIS INC                   
                                                            PC-01          14,336                  06/27/11   07/27/11    JAMES L LEWIS INC                   
                                                            PC-02          -1,584                  06/27/11   07/27/11    JAMES L LEWIS INC                   
                                                            PC-03             263                  06/04/12   10/07/13    JAMES L. LEWIS INC                  
 
07-0921   Reconstruction               0-015-019  06/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-1          132,164                  02/17/09   04/23/09    POOLER ENTERPRISES, INC.            
                                                            SC-2           15,934                  11/19/09   01/20/10    POOLER ENTERPRISES INC              
                                                            SC-3            8,447                  11/19/09   01/20/10    POOLER ENTERPRISES INC              
                                                            SC-4             -696                  11/19/09   01/20/10    POOLER ENTERPRISES INC              
 
12-0814   Reconstruction               0-015-020  02/25/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-001           5,088                  06/12/13   07/25/13    WILKINS MECHANICAL INC              
                                                            e-001          -2,076                  04/29/14   07/03/14    billitier electric                  
 
13-0570   Reconstruction               0-015-021  01/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         51,586                  09/22/14   07/07/16    Bellows Construction Specialities   
                                                            GC-002          7,086                  09/22/14     /  /      Bellows Construction Specialities   
                                                            GC-003         15,336                  03/20/15   03/27/15    Bellows Construction Specialities   
 
14-0876   Reconstruction               0-015-022  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1825   Reconstruction               0-015-023  08/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1873   Reconstruction               0-015-024  02/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,334                  01/29/20   02/28/20    MCPHERSON BUILDERS                  
 
19-0115   Reconstruction               0-015-025  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-001        24,646                  11/22/21   12/22/22    Welliver McGuire Inc                
                                                            101-002         5,029                  11/22/21   12/22/22    Welliver McGuire Inc                
                                                            101-004         5,792                  02/14/22   02/16/23    Welliver McGuire Inc                
                                                            101-005         1,268                  03/23/22   04/19/23    Welliver McGuire Inc                
                                                            101-006         7,202                  03/23/22   04/20/23    Welliver McGuire Inc                
                                                            101-008         7,288                  03/23/22   04/20/23    Welliver McGuire Inc                
                                                            101-010         1,039                  05/23/22   03/28/23    Welliver McGuire Inc                
                                                            101-014         4,837                  11/07/22   11/02/23    WELLIVER MCGUIRE INC                
                                                            102-001       -24,566                  04/24/23   12/27/23    KIMBLE                              
                                                            102-002          -600                  07/03/23   12/29/23    KIMBLE                              
                                                            103-002       -18,563                  04/24/23   12/27/23    FREY & CAMPBELL                     
                                                            104-001        29,951                  11/09/20   01/27/21    MATCO ELECTRIC CORP.                
                                                            104-002        10,605                  02/22/21   04/02/21    MATCO ELECTRIC CORP.                
                                                            104-003         4,212                  04/02/21   05/05/21    MATCO ELECTRIC CORP.                
                                                            104-005         1,947                  05/20/21   08/13/21    Matco Electric Corporation          
                                                            104-006        11,903                  05/20/21   08/13/21    Matco Electric Corporation          
                                                            104-007         8,823                  05/20/21   08/13/21    Matco Electric Corporation          
                                                            104-008         5,434                  07/14/21   12/16/21    Matco Electric Corporation          
                                                            104-009        11,858                  08/09/21   04/12/22    MATEO ELECTRIC CORP                 
                                                            104-010        20,502                  09/03/21   05/24/22    MATRO ELECTRIC CORP                 
                                                            104-013         3,626                  10/04/21   11/22/22    Matco Electic Corporation           
                                                            104-014         3,044                  10/07/21   07/26/22    Marco Electric Corp                 
                                                            104-016        12,898                  10/04/21   12/02/22    Matco Electric Corporation          
                                                            104-017         4,473                  11/01/21   09/06/22    Mateo Electric Corp                 
                                                            104-019        11,691                  11/22/21   12/15/22    Matco Electric Corp                 
                                                            104-020        31,286                  11/22/21   12/14/22    Matco Electric Corp                 
                                                            104-021         2,681                  11/22/21   12/14/22    Matco Electric Corp                 
                                                            104-023        10,138                  11/22/21   12/14/22    Matco Electric Corp                 
                                                            104-025           922                  02/14/22   02/13/23    Matco Elec Corp                     
                                                            104-026         1,423                  02/14/22   02/13/23    Matco Elec Corp                     
                                                            104-028         9,957                  02/14/22   02/13/23    Matco Elec Corp                     
                                                            104-030           567                  03/23/22   04/04/23    Matco Elec Corp                     
                                                            104-032         1,496                  07/18/22   03/23/23    Matco Elec Corp                     
                                                            108-001         1,859                  05/06/21   05/25/21    FIELDTURF                           
                                                            109-001        -2,424                  04/03/23   12/21/23    GT GRANDSTANDS                      
                                                            109-002          -600                  07/17/23   12/15/23    GT GRANDSTANDS                      
                                                            112-001           460                  07/14/21   12/16/21    Day Automation                      
 
20-1818   Reconstruction               0-015-026  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            402-001         6,004                  04/03/23   12/21/23    SIRACUSA MECHANICAL                 
                                                            404-009         3,646                  09/12/23   12/18/23    MATCO ELECTRIC CORP                 
                                                            404-009         3,646                  08/28/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            404-011         3,073                  09/12/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            404-011         3,073                  08/28/23   12/18/23    MATCO ELECTRIC CORP                 
                                                            408-002        10,831                  09/12/23   12/28/23    DAY AUTOMATION                      
 
19-1902   Reconstruction               0-015-027  07/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            202-001        48,628                  09/12/22   05/31/23    Kimble Inc                          
                                                            203-001        -7,180                  05/24/23   12/29/23    FREY & CAMPBELL                     
 
22-1999   Additions and Alterations    0-015-028  10/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0388FP Reconstruction               0-015-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0265SC Visual Structural Inspection 0-015-SC1  10/17/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Caroline Elem School(K-5):
93-1054   Reconstruction               0-017-005  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0474   Reconstruction               0-017-007  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2E-04          5,951                  10/22/03   11/04/03    Matco Elec.                         
                                                            G2H-06            649                  09/30/03   10/14/03    James Lewis                         
                                                            G@H-10            260                  11/13/03   12/22/03    James Lewis                         
 
06-1558SR Reconstruction               0-017-008  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -3,500                  11/30/07   03/19/08    Shisler Electrical Contractor, Inc. 
                                                            SW-01           2,800                  10/09/07   10/23/07    DAVIS WALLBRIDGE, INC.              
                                                            SW-02          28,000                  11/07/07   11/08/07    Davis Wallbridge Inc                
                                                            SW-03           4,900                  11/07/07   11/08/07    Davis Wallbride Inc                 
                                                            SW-04               0                  11/07/07   11/08/07    Davis Wallbridge Inc                
                                                            SW-05          -9,650                  11/29/07   12/12/07    Davis Wallbridge,Inc.               
 
07-0922   Reconstruction               0-017-008  06/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-1           -1,500                  04/29/11   05/24/11    SUNSTREAM CORP                      
                                                            EC-1            4,544                  10/22/09   03/19/10    MATCO ELECTRIC CORPORATION          
                                                            EC-2             -122                  04/02/10   06/09/10    MATCO ELECTRIC CORPORATION          
                                                            GC-1          -16,405                  04/02/10   06/16/10    McPherson Builders                  
                                                            GC-2            5,294                  11/01/10   12/01/10    MCPHERSON BUILDERS INC              
                                                            GC-3           -2,512                  03/17/11   04/01/11    MCPHERSON BUILDERS INC              
                                                            GC-3           -2,512                  04/29/11   05/24/11    MCPHERSON BUILDERS INC              
                                                            MC-1          -17,949                  02/18/10   08/06/10    JAMES L LEWIS INC                   
                                                            MC-2           20,029                  03/04/11   03/25/11    JAMES L LEWIS INC                   
                                                            RC-1          -13,247                  12/11/09   01/21/10    A.W. FARRELL & SON INC              
                                                            SC-1          -10,781                  10/22/09   03/19/10    RUSTON PAVING CO INC                
 
14-0877   Reconstruction               0-017-009  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1716   Reconstruction               0-017-010  05/30/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001            627                  10/12/17   10/19/17    ZMK Construction, Inc.              
                                                            GC-002          4,649                  01/19/18   02/02/18    ZMK Construction, Inc.              
 
16-1826   Reconstruction               0-017-011  11/29/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1                 133                  05/29/18   07/24/18    MATCO ELECTRIC CORP.                
 
19-0116   Reconstruction               0-017-012  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            106-001       -14,182                  04/02/21   05/05/21    BOLAND'S EXCAVATING & TOPSOIL, INC. 
 
20-1819   Reconstruction               0-017-013  02/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0654   Reconstruction               0-017-014  02/01/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0393FP Reconstruction               0-017-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Northeast Elem School(K-5):
93-1055   Reconstruction               0-024-002  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0476   Reconstruction               0-024-003  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2H-14            420                  11/13/03   12/22/03    James Lewis                         
                                                            G3E-03          1,392                  01/13/04   01/26/04    Richardson Bros. Elec.              
                                                            G3E-04          2,354                  01/13/04   01/26/04    Richardson Bros. Elec.              
                                                            G3E-06         -1,230                  03/17/05   06/21/05    Richardson Brothers Electrical      
                                                            G3G-03            904                  02/24/04   03/02/04    Bouley Associates                   
                                                            G3P-05            837                  11/12/03   12/22/03    Louis Picciano and Sons             
 
02-2407   Reconstruction               0-024-004  06/26/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -4,875                  03/26/04   04/01/04    Diamond Roofing Co                  
 
03-1592   Reconstruction               0-024-005  06/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002           -20,000                  02/16/05   02/24/05    Diamond Roofing Co                  
                                                            04             -5,140                  04/04/05   06/21/05    Diamond Roofing Co                  
                                                            C-01              541                  09/03/04   09/16/04    Diamond Roofing                     
 
08-0544   Reconstruction               0-024-006  03/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-4            6,804                  01/31/11   03/03/11    MATCO ELECTRIC CORP                 
                                                            EC-6            2,357                  03/17/11   04/01/11    MATCO ELECTRIC CORP                 
                                                            EC-7              -79                  04/29/11   05/24/11    MTCO ELECTRIC CORP                  
                                                            EC-9            1,299                  04/29/11   05/24/11    MATCO ELECTRIC CORP                 
                                                            GC-2            5,423                  08/30/10   09/27/10    MCPHERSON BUILDERS, INC.            
                                                            GC-4            3,459                  02/16/11   03/11/11    MCPHERSON BUILDERS INC              
                                                            GC-5           22,699                  02/16/11   03/11/11    MCPHERSON BUILDERS INC              
                                                            GC-6           -5,084                  09/21/12   01/04/13    MCPHERSON BUILDERS INC              
                                                            HVAC-1         -4,393                  03/17/11   04/01/11    KIMBLE INC                          
                                                            HVAC-3          1,566                  08/01/11   09/07/11    KIMBLE INC                          
                                                            SC-1           54,606                  10/19/09   11/18/09    BOTHAR CONSTRUCTION LLC             
                                                            SC-10           8,170                  09/24/10   11/17/10    BOTHAR CONSTRUCTION LLC             
                                                            SC-11           8,960                  02/16/11   03/11/11    BOTHAR CONSTRUCTION LLC             
                                                            SC-13           4,138                  03/04/11   03/25/11    BOTHAR CONSTRUCTION LLC             
                                                            SC-2           15,760                  11/09/09   02/26/10    BOTHAR CONSTRUCTION LLC             
                                                            SC-4           39,473                  12/11/09   01/21/10    BOTHAR CONSTRUCTION LLC             
                                                            SC-5            1,733                  12/11/09   01/21/10    BOTHAR CONSTRUCTION LLC             
 
14-0878   Reconstruction               0-024-007  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0117   Reconstruction               0-024-008  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-015        -2,059                  11/07/22   11/02/23    WELLIVER MCGUIRE INC.               
 
19-0038   Reconstruction               0-024-009  08/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0679   Reconstruction               0-024-010  01/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0391FP Reconstruction               0-024-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Boynton MS (6-8):
90-0863   Reconstruction               0-026-002  03/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1606   Reconstruction               0-026-004  09/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1056   Reconstruction               0-026-005  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0898   Reconstruction               0-026-006  03/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1445   Reconstruction               0-026-007  05/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0011   Reconstruction               0-026-008  08/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0477   Reconstruction               0-026-009  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2H-16            416                  11/13/03   12/22/03    James Lewis                         
                                                            G2P-03            879                  09/30/03   10/14/03    Louis Picciano                      
                                                            G3G-01          9,962                  02/24/04   03/02/04    Bouley Associates                   
                                                            G3G-04          4,189                  02/24/04   03/02/04    Bouley Associates                   
                                                            G3P-04            980                  11/12/03   12/22/03    Louis Picciano                      
                                                            g3e02           1,075                  01/13/04   01/26/04    Richardson Bros. Elec.              
 
00-1674   Reconstruction               0-026-010  05/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01A            23,937          23,937  01/28/02   02/23/06    Midlantic Environ.                  
                                                            02              7,300                  01/28/02   03/08/02    Midlantic Environ.                  
                                                            02A             7,300                  02/14/06   02/23/06    MIDLANTIC ENVIRONMENTAL             
                                                            04              8,305                  04/09/02   05/09/02    Midlantic Environ.                  
                                                            05A             8,773                  01/21/03   01/23/03    Midlantic Environ.                  
 
00-1790   Reconstruction               0-026-011  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            8              -3,729                  04/04/05   06/10/05    Mcpherson Builders                  
                                                            E7a5             -625                  01/09/04   04/18/06    Richardson Bros.                    
                                                            G-5             2,705                  03/18/03   04/18/03    McPherson Builders                  
                                                            H-3             1,540                  05/05/03   05/07/03    Coon Heating                        
                                                            H1              1,050                  02/24/03   03/13/03    Coon Heating                        
                                                            H5                216                  06/19/03   07/07/03    Coon Heating                        
 
07-0951   Reconstruction               0-026-012  04/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-1            4,106                  03/02/09   06/23/09    SUNSTREAM CORPORATION               
                                                            AC-3           51,967                  10/07/09   10/30/09    SUNSTREAM CORPORATION               
                                                            AC-4            1,400                  12/11/09   02/05/10    SUNSTREAM CORPORATION               
                                                            AC-5              700                  12/11/09   02/05/10    SUNSTREAM CORPORATION               
                                                            AC-7           11,750                  09/07/10   09/27/10    SUNSTREAM CORPORATION               
                                                            AC-8           14,686                  01/31/11   02/25/11    SUNSTREAM CORPORATION               
                                                            AC-9            1,589                  02/16/11   03/03/11    SUNSTREAM CORPORATION               
                                                            EC-6            1,509                  04/27/09   08/07/09    RICHARDSON BROTHERS                 
                                                            EC-7              983                  04/27/09   08/07/09    RICHARDSON BROTHERS                 
                                                            EW-1           20,275                  12/15/08   01/16/09    RICHARDSON BROTHERS                 
                                                            EW-2              558                  04/27/09   08/07/09    RICHARDSON BROTHERS                 
                                                            EW-3            2,681                  04/27/09   08/07/09    RICHARDSON BROTHERS                 
                                                            GC-1            2,706                  02/02/09   07/02/09    LOBAR INC                           
                                                            GC-10          10,826                  11/09/09   12/08/09    LOBAR INC                           
                                                            GC-11           1,880                  12/11/09   02/04/10    LOBAR INC                           
                                                            GC-14           3,517                  12/31/09   02/02/10    LOBAR INC                           
                                                            GC-15           8,115                  12/31/09   02/02/10    LOBAR INC                           
                                                            GC-19             941                  03/08/10   05/20/10    LOBAR INC                           
                                                            GC-20           9,152                  08/25/10   09/13/10    LOBAR INC                           
                                                            GC-23           4,018                  08/30/10   09/28/10    LOBAR, INC.                         
                                                            GC-24           9,784                  08/30/10   09/15/10    LOBAR, INC.                         
                                                            GC-25           4,203                  12/03/10   01/06/11    LOBAR INC                           
                                                            GC-26           1,044                  02/16/11   03/03/11    LOBAR INC                           
                                                            GC-28           1,345                  04/04/11   05/13/11    LOBAR INC                           
                                                            GC-3            6,727                  03/02/09   06/23/09    LOBAR INC                           
                                                            GC-3           23,050                  12/11/09     /  /      EDGER ENTERPRISES INC               
                                                            GC-4            6,351                  04/27/09   07/30/09    LOBAR INC                           
                                                            GC-5            1,093                  04/27/09   07/30/09    LOBAR INC                           
                                                            GC-6            3,296                  04/27/09   07/30/09    LOBAR INC                           
                                                            HC-1            3,467                  08/05/09   11/13/09    FREY & CAMPBELL INC                 
                                                            HC-10           1,155                  03/26/10   05/10/10    FREY & CAMPBELL INC                 
                                                            HC-15           2,172                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-16          11,634                  08/25/10   09/13/10    FREY & CAMPBELL INC                 
                                                            HC-2            3,962                  08/05/09   11/13/09    FREY & CAMPBELL INC                 
                                                            HC-20           1,368                  04/04/11   05/16/11    FREY & CAMPBELL INC                 
                                                            HC-28           8,334                  03/15/12   09/07/12    FREY & CAMPBELL INC                 
                                                            HC-30          -8,475                  03/15/12   09/07/12    FREY & CAMPBELL INC                 
                                                            HC-34            -987                  09/26/12   07/01/13    FREY & CAMPBELL INC                 
                                                            HC-4           12,282                  10/19/09   11/12/09    FREY & CAMPBELL INC                 
                                                            HC-7            3,974                  12/11/09   02/04/10    FREY & CAMPBELL INC                 
                                                            PC-1            5,629                  03/02/09   08/05/09    FREY & CAMPBELL, INC.               
                                                            PC-10          11,602                  12/03/10   01/06/11    FREY & CAMPBELL INC                 
                                                            PC-2            2,320                  08/05/09   11/13/09    FREY & CAMPBELL INC                 
                                                            PC-4           13,877                  03/26/10   05/10/10    FREY & CAMPBELL INC                 
                                                            PC-5              969                  03/26/10   05/10/10    FREY & CAMPBELL INC                 
                                                            PC-8            9,859                  05/05/10   08/04/10    FREY & CAMPBELL INC                 
                                                            PC-9           11,969                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            RW-2            6,558                  02/16/11   03/03/11    J&B INSTALLATIONS INC               
                                                            RW-4           10,169                  01/31/11   02/25/11    J&B INSTALLATIONS INC               
                                                            SW-1           88,174                  02/02/09   07/02/09    EDGER ENTERPRISES, INC.             
                                                            SW-2           18,172                  02/02/09   07/02/09    EDGER ENTERPRISES, INC.             
                                                            SW-3            1,592                  10/07/09   10/30/09    EDGER ENTERPRISES INC               
                                                            SW-7           43,069                  09/13/10   09/28/10    EDGER ENTERPRISES INC               
                                                            SW-8           26,740                  09/13/10   09/28/10    EDGER ENTERPRISES INC               
                                                            SW-9            6,534                  01/30/12   05/17/12    EDGER ENTERPRISES INC               
 
08-0102   Reconstruction               0-026-013  04/22/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-14           2,288                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-15           2,016                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-17           6,016                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-18           5,288                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-2            2,165                  11/19/09   01/15/10    RICHARDSON BROTHERS                 
                                                            EC-21           2,712                  05/05/10   09/07/10    RICHARDSON BROTHERS                 
                                                            EC-23           3,901                  05/05/10   07/28/10    RICHARDSON BROTHERS                 
                                                            EC-25           1,687                  11/08/10   11/12/10    RICHARDSON BROTHERS                 
                                                            EC-26           1,132                  01/31/11   02/24/11    RICHARDSON BROTHERS                 
                                                            EC-28            -388                  03/15/12   08/06/12    RICHARDSON BROTHERS                 
                                                            EC-4              582                  11/19/09   01/15/10    RICHARDSON BROTHERS                 
                                                            GC-1            2,860                  11/09/09   12/08/09    LOBAR INC                           
                                                            GC-11          23,720                  12/31/09   02/12/10    LOBAR INC                           
                                                            GC-19          23,740                  05/17/10     /  /      LOBAR INC                           
                                                            GC-21          10,043                  05/17/10   07/28/10    LOBAR INC                           
                                                            GC-22           7,812                  06/28/10   09/14/10    LOBAR INC                           
                                                            GC-25           9,943                  08/25/10   09/13/10    LOBAR INC                           
                                                            GC-3              785                  11/09/09   12/08/09    LOBAR INC                           
                                                            GC-5              676                  11/09/09   12/08/09    LOBAR INC                           
                                                            GC-6             -582                  12/11/09   02/12/10    LOBAR INC                           
                                                            GC-7            4,166                  12/31/09   02/12/10    LOBAR INC                           
                                                            HC-12          14,087                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-14           6,644                  12/03/10   01/23/12    FREY & CAMPBELL INC                 
                                                            HC-16         -15,824                  04/04/11   04/29/11    FREY & CAMPBELL INC                 
                                                            HC-2            9,975                  01/15/10   02/19/10    FREY & CAMPBELL INC                 
                                                            HC-3           13,205                  01/26/10   03/18/10    FREY & CAMPBELL INC                 
                                                            HC-4            7,878                  03/26/10   05/14/10    FREY & CAMPBELL INC                 
                                                            HC-6            4,681                  03/26/10   05/14/10    FREY & CAMPBELL INC                 
                                                            HC-7            6,321                  03/26/10   05/14/10    FREY & CAMPBELL INC                 
 
14-0879   Reconstruction               0-026-014  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1495   Reconstruction               0-026-015  06/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          1,457                  10/29/15   12/01/15    Edger Enterprises of Elmira, Inc.   
                                                            GC-00200          999                  02/29/16   03/03/16    Edger Enterprises of Elmira, Inc.   
 
19-0118   Reconstruction               0-026-016  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            105-001        -4,315                  08/29/22   08/22/23    Edger Entrps Inc                    
                                                            107-001       -50,000                  09/25/20   12/02/20    APPLE ROOFING CORP.                 
                                                            107-002        -9,654                  09/25/20   12/02/20    APPLE ROOFING CORP.                 
 
20-1820   Reconstruction               0-026-017  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401-001        -1,761                  08/29/22   09/07/23    Streeter Assocs Inc                 
                                                            402-003        10,984                  07/03/23   12/29/23    SIRACUSA MECHANICAL                 
                                                            404-003         6,771                  05/08/23   12/29/23    MATCO ELECTRIC CORP                 
                                                            404-008        -6,771                  09/12/23     /  /      MATCO ELECTRIC CORP                 
                                                            404-008        -6,771                  08/28/23   12/18/23    MATCO ELECTRIC CORP                 
                                                            408-001         1,695                  06/20/23   12/22/23    DAY AUTOMATION                      
 
20-1532   Reconstruction               0-026-018  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            301-001        -6,000                  05/24/23   01/02/24    EDGER ENTERPRISES                   
 
20-0498   Reconstruction               0-026-019  01/27/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0389FP Reconstruction               0-026-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dewitt MS (6-8):
90-0864   Reconstruction               0-027-003  03/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1607   Reconstruction               0-027-004  09/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1057   Reconstruction               0-027-005  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0899   Reconstruction               0-027-006  03/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0012   Reconstruction               0-027-007  08/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1791   Reconstruction               0-027-008  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E7a6             -625                  01/09/04   01/20/04    Richardson Bros.                    
                                                            G-6             2,369                  03/18/03   04/18/03    McPherson Builders                  
                                                            G-9            -3,729                  04/04/05   06/10/05    McPherson Builders                  
                                                            H-4             1,540                  05/05/03   05/07/03    Coon Heating                        
                                                            H2              1,050                  02/24/03   03/13/03    Coon Heating                        
                                                            H6                216                  06/19/03   07/07/03    Coon Heating                        
 
01-0478   Reconstruction               0-027-009  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2H-17          2,451                  11/13/03   12/22/03    James Lewis                         
                                                            G3G-05          3,486                  02/24/04   03/02/04    Bouley Associates                   
 
00-1675   Reconstruction               0-027-010  05/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01B            32,612          32,612  11/16/01   02/23/06    Midlantic Environmental             
                                                            02B             7,900                  01/28/02   02/23/06    Midlantic Environmental             
                                                            03              4,991                  03/07/02   04/04/02    Midlantic Environmental             
                                                            05B             5,904                  01/21/03   01/23/03    Midlantic Environmental             
 
03-1593   Reconstruction               0-027-011  06/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003           -10,000                  02/16/05   02/24/05    Diamond Roofing Co                  
 
07-0952   Reconstruction               0-027-012  04/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-5            1,555                  04/27/09   08/07/09    RICHARDSON BROTHERS                 
                                                            GC-13           3,264                  12/31/09     /  /      LOBAR INC                           
                                                            GC-16           8,514                  12/31/09   02/02/10    LOBAR INC                           
                                                            GC-17           5,745                  03/08/10   05/20/10    LOBAR INC                           
                                                            GC-18           8,051                  03/08/10   05/20/10    LOBAR INC                           
                                                            GC-21           3,211                  08/25/10   09/13/10    LOBAR INC                           
                                                            GC-27              92                  03/23/11   05/12/11    LOBAR INC                           
                                                            GC-8           48,552                  11/09/09   12/08/09    LOBAR INC                           
                                                            GC-9           10,826                  11/09/09   12/08/09    LOBAR INC                           
                                                            HC-11           8,720                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-12          13,265                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-17          11,871                  08/25/10   09/13/10    FREY & CAMPBELL INC                 
                                                            HC-19          32,020                  11/08/10   11/30/10    FREY & CAMPBELL INC                 
                                                            HC-21           1,368                  04/04/11   05/16/11    FREY & CAMPBELL INC                 
                                                            HC-23           3,017                  04/04/11   05/13/11    FREY & CAMPBELL INC                 
                                                            HC-25           3,349                  01/30/12   07/16/12    FREY & CAMPBELL INC                 
                                                            HC-26           3,029                  01/30/12   07/16/12    FREY & CAMPBELL INC                 
                                                            HC-29           8,334                  03/15/12   09/07/12    FREY & CAMPBELL INC                 
                                                            HC-31          -8,475                  03/15/12   09/07/12    FREY & CAMPBELL INC                 
                                                            HC-33            -987                  09/26/12   07/01/13    FREY & CAMPBELL INC                 
                                                            HC-8            3,974                  12/11/09   02/05/10    FREY & CAMPBELL INC                 
                                                            PC-3            8,164                  03/26/10   05/10/10    FREY & CAMPBELL INC                 
                                                            PC-6            5,346                  03/26/10   05/10/10    FREY & CAMPBELL INC                 
                                                            PC-7            7,765                  05/07/10   08/04/10    FREY & CAMPBELL INC                 
                                                            RW-1           25,241                  04/20/09   06/19/09    J&B INSTALLATIONS INC               
                                                            RW-3            6,558                  02/16/11   03/03/11    J&B INSTALLATIONS INC               
                                                            RW-5           10,169                  01/31/11   02/25/11    J&B INSTALLATIONS INC               
 
08-0103   Reconstruction               0-027-013  04/22/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           19,642                  11/19/09   01/15/10    RICHARDSON BROTHERS                 
                                                            EC-10           1,844                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-11           3,221                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-12           2,073                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-13           3,433                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-16           6,158                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            EC-19          11,692                  03/06/10   04/07/14    RICHARDSON BROTHERS                 
                                                            EC-20           5,373                  05/05/10   07/28/10    RICHARDSON BROTHERS                 
                                                            EC-22           5,766                  05/05/10   07/28/10    RICHARDSON BROTHERS                 
                                                            EC-24          13,145                  09/24/10   10/19/10    RICHARDSON BROTHERS                 
                                                            EC-27           1,132                  01/31/11   02/24/11    RICHARDSON BROTHERS                 
                                                            EC-9            2,128                  03/15/10   05/14/10    RICHARDSON BROTHERS                 
                                                            GC-12          22,232                  01/15/10   02/19/10    LOBAR INC                           
                                                            GC-13           9,912                  01/26/10   03/18/10    LOBAR INC                           
                                                            GC-14           3,655                  07/19/10   09/03/10    LOBAR INC                           
                                                            GC-16          24,422                  05/17/10   07/28/10    LOBAR INC                           
                                                            GC-17          15,723                  05/17/10   07/28/10    LOBAR INC                           
                                                            GC-18           6,868                  05/17/10   07/28/10    LOBAR INC                           
                                                            GC-19          23,740                  05/17/10   07/28/10    LOBAR, INC                          
                                                            GC-2              785                  11/09/09   12/08/09    LOBAR INC                           
                                                            GC-20           9,191                  05/17/10   07/28/10    LOBAR                               
                                                            GC-23           3,631                  06/28/10   09/07/10    LOBAR INC                           
                                                            GC-24          16,835                  08/25/10   09/13/10    LOBAR INC                           
                                                            GC-4            3,498                  11/09/09   12/08/09    LOBAR INC                           
                                                            GC-8            3,232                  12/31/09   02/12/10    LOBAR INC                           
                                                            HC-1            2,733                  01/15/10   03/19/10    FREY & CAMPBELL INC                 
                                                            HC-10           8,920                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
                                                            HC-13           6,644                  12/03/10   01/23/12    FREY & CAMPBELL INC                 
                                                            HC-15            -175                  04/04/11   04/29/11    FREY & CAMPBELL INC                 
                                                            HC-5            2,259                  03/26/10   05/14/10    FREY & CAMPBELL INC                 
                                                            HC-8            1,490                  03/26/10   05/14/10    FREY & CAMPBELL INC                 
                                                            HC-9            7,234                  07/19/10   09/03/10    FREY & CAMPBELL INC                 
 
14-0880   Reconstruction               0-027-014  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1988   Reconstruction               0-027-015  06/25/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1821   Reconstruction               0-027-016  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401-002        -2,502                  08/29/22   08/22/23    Streeter Assocs Inc                 
                                                            401-005           187                  01/09/23   12/07/23    STREETER ASSOC INC                  
                                                            404-002        27,094                  05/08/23   12/29/23    MATCO ELECTRIC CORP                 
                                                            404-012           925                  09/12/23     /  /      MATCO ELECTRIC CORP                 
                                                            404-012           925                  08/28/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            404-015         1,419                  09/12/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            404-015         1,419                  08/28/23     /  /      MATCO ELECTRIC CORP                 
                                                            409-003         5,240                  09/12/23   12/28/23    DAY AUTOMATION SYSTEMS INC.         
 
20-1533   Reconstruction               0-027-017  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0392FP Reconstruction               0-027-FP1  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wilson Annex @ Sherman Sch.See 0-007:
93-1058   Reconstruction               0-028-002  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1792   Reconstruction               0-028-004  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1b               421                  08/20/02   10/28/02    Richardson Bros.                    
                                                            E7a2             -625                  01/09/04   01/20/04    Richardson Bros.                    
 
01-0479   Reconstruction               0-028-005  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2H-09            350                  11/13/03   12/22/03    James Lewis                         
 
09-0198   Reconstruction               0-028-006  04/29/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -4,275                  03/17/11   04/01/11    RICHARDSON BROTHERS                 
                                                            EC-003        -15,000                  03/05/12   09/07/12    RICHARDSON BROTHERS                 
                                                            EC-004         -3,369                  03/20/12   09/07/12    RICHARDSON BROTHERS                 
                                                            GC-002         -3,080                  09/26/12   01/25/13    MASSA CONSTRUCTION INC              
                                                            MC-003        -12,322                  03/05/12   09/07/12    FREY & CAMPBELL INC                 
                                                            RC-001        -12,500                  04/29/11   05/20/11    J&B INSTALLATIONS                   
                                                            SC-001         11,964                  03/04/11   03/28/11    NELSON & STREETER CONSTRUCTION      
                                                            SC-002          2,800                  03/17/11   04/01/11    NELSON & STREETER CONSTRUCTION      
 
14-0881   Reconstruction               0-028-007  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0119   Reconstruction               0-028-008  10/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1822   Reconstruction               0-028-009  02/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            404-005        30,772                  06/20/23   12/27/23    MATCO ELECTRIC                      
 

          Amphitheater-Alt.Comm. School:
02-0029   New Construction             0-030-001  07/11/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Temp. Classroom - Complex A:
22-2322   New Construction             0-060-001  10/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Temp. Classroom - Complex B:
22-2323   New Construction             0-061-001  10/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Danby Facility(former E.S):
00-1789   Reconstruction               1-021-001  11/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E3              2,179                  02/24/03   03/04/03    Richardson Brothers Electrical      
                                                            G-7             6,837                  11/06/03   11/10/03    McPherson Builders                  
                                                            G1a                38                  02/10/03   02/24/03    McPherson Builders                  
 
96-1442   Reconstruction               1-021-002  05/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0475   Reconstruction               1-021-004  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            G2E-02          2,194                  10/22/03   11/04/03    Matco Elec.                         
                                                            G2H-12            262                  11/13/03   12/22/03    James Lewis                         
 
14-0882   Reconstruction               1-021-005  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Stockroom Shops/offices:
93-1059   Reconstruction               2-005-001  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0480   Reconstruction               2-005-003  07/26/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Association Offices Bldg(was storage:
01-0481   Reconstruction               2-008-001  07/26/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Field:
01-0482   Reconstruction               2-009-001  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1G-04          2,553                  09/30/03   10/14/03    Paul Yaman Const.                   
                                                            G1G-06          1,935                  01/13/04   01/20/04    Paul Yaman Const.                   
 

          New Athletic Storage Building:
04-0144   New Construction             2-049-001  12/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E-01                0                  05/18/05   06/10/05    Nelcorp Electrical Contracting      
                                                            E-02                0                  05/31/05   07/21/05    Nelcorp Electrical Contracting      
                                                            E-03              860                  11/08/05   01/23/12    NELCORP ELETRICAL CONTRACTING CORP. 
                                                            GC-001         16,890                  07/25/07   08/07/07    Fingerlakes construction            
 

          Athletic Field Storage Bldg. #2:
04-0145   New Construction             2-050-001  12/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Center:
93-0037   Reconstruction               5-002-002  09/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1060   Reconstruction               5-002-003  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1444   Reconstruction               5-002-004  05/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0483   Additions and Alterations    5-002-005  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            61A-02         -1,344                  08/26/04   09/27/04    Fibertech Environ.                  
                                                            G1A-01          2,475                  07/17/03   07/25/03    Fibertech Environ.                  
                                                            G1E-01            759                  05/17/04   06/04/04    Matco Elec.                         
                                                            G1E-02            759                  05/17/04   06/04/04    Matco Elec.                         
                                                            G1G-01          2,743                  07/17/03   07/25/03    Paul Yaman Const.                   
                                                            G1G-02          1,022                  07/17/03   07/25/03    Paul Yaman Const.                   
                                                            G1G-03          5,036                  09/30/03   10/14/03    Paul Yaman Const.                   
                                                            G1G-05          6,264                  10/22/03   11/04/03    Paul Yaman Const.                   
                                                            G1H-01            409                  02/26/04   03/12/04    Frey & Campbell                     
                                                            G1P-01         -5,700                  09/16/03   09/19/03    Buchanan Inc                        
 
03-1641   Reconstruction               5-002-006  07/06/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001               351                  12/20/04   02/11/05    Matco Electric                      
                                                            003             3,852                  06/30/05   07/14/05    Matco Electrical Corp               
                                                            02              2,020                  12/20/04   02/11/05    Matco Electric Corp                 
 
07-0124   Reconstruction               5-002-007  08/15/07  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0883   Reconstruction               5-002-008  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1496   Reconstruction               5-002-009  06/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0868   Reconstruction               5-002-010  07/19/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0120   Reconstruction               5-002-011  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            103-001       -10,161                  11/01/21   09/06/22    Frey 7 Campbell, Inc                
                                                            104-004           612                  04/02/21   05/05/21    MATCO ELECTRIC CORP.                
 
22-2051   Reconstruction               5-002-012  09/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Markles Flats Storage/Rental:
10-1235   Reconstruction               7-016-001  10/04/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          PA Booth Demolition:
19-0121   Reconstruction               7-019-001  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            104-012        10,997                  09/03/21     /  /      MATCO ELECTRIC CORP                 
                                                            104-018         2,976                  11/01/21   08/30/22    Mateo Electric Corp                 
 

          Athletic Fields Restroom Facility:
07-0923   New Construction             7-051-001  06/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1             -313                  02/18/10   09/19/11    MATCO ELECTRIC                      
                                                            GC-1           -2,504                  11/23/09   03/16/10    CONMAS INC                          
                                                            MC-1            3,239                  02/02/09   04/10/09    KING & KING MECHANICAL              
                                                            MC-2              -78                  11/23/09   09/19/11    KING & KING MECHANICAL              
                                                            PC-1           -2,600                  02/18/10   07/09/10    D'AMICO PLUMBING & HEATING          
 

          Maintenance Facility:
14-0884   Reconstruction               7-052-002  04/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
19-0122   New Construction             7-057-001  10/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Caroline Pavilion:
21-0576   New Construction             7-059-001  02/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
94-1205   Reconstruction               7-999-001  03/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1633   Reconstruction               7-999-002  04/26/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-1           25,417                  03/28/05   07/26/06    Blanding Electric                   
                                                            CC-2           22,662                  05/23/02   05/29/02    Blanding Elec.                      
                                                            CC-3          -16,000                  03/28/05   07/26/06    Blanding Electric                   
 
08-0475   Reconstruction               7-999-003  03/31/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1          -17,321                  01/31/11   02/25/11    CONTROL NETWORK COMMUNICATIONS      
                                                            EC-2          -17,525                  01/31/11   02/25/11    CONTROL NETWORK COMMUNICATIONS      
                                                            GC-1           -7,858                  01/31/11   02/25/11    MCPHERSON BUILDERS INC              
                                                            GC2            -7,409                  04/04/11   05/16/11    MCPHERSON BUILDERS INC              
                                                            HVAC-1          7,112                  05/13/11   06/07/11    KIMBLE INC                          
                                                            HVAC-2         -4,305                  08/25/11   09/07/11    KIMBLE INC                          
 
11-0971   Reconstruction               7-999-004  05/18/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1123   Reconstruction               7-999-005  05/10/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1460   Reconstruction               7-999-006  11/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001        -38,750                  10/15/18   11/06/18    MATCO ELECTRIC CORP                 
                                                            EC-002         21,985                  11/16/18   12/03/18    MATCO ELECTRIC CORP                 
                                                            EC-003         23,234                  12/28/18   02/01/19    MATCO ELECTRIC CORP                 
                                                            EC-004          7,703                  01/17/19   02/11/19    MATCO ELECTRIC CORP.                
                                                            EC-005          1,185                  01/17/19   02/11/19    MATCO ELECTRIC CORP.                
                                                            EC-006            334                  01/17/19   02/11/19    MATCO ELECTRIC CORP.                
                                                            EC-008         22,728                  05/06/19   05/08/19    MATCO ELECTRIC CORP.                
                                                            EC-009         27,541                  05/06/19   05/08/19    MATCO ELECTRIC CORP.                
                                                            EC-010          2,366                  05/06/19   05/08/19    MATCO ELECTRIC CORP.                
                                                            EC-011          1,041                  05/06/19   05/08/19    MATCO ELECTRIC CORP.                
                                                            EC-012          9,488                  06/20/19   06/24/19    MATCO ELECTRIC CORP.                
                                                            EC-013         19,261                  07/12/19   07/15/19    MATCO ELECTRIC CORP.                
                                                            EC-014        -10,000                  10/28/19   10/28/19    MATCO ELECTRIC CORP.                
                                                            EC007          14,392                  03/06/19   03/08/19    MATCO ELECTRIC CORPORATION          
 
20-0359   Reconstruction               7-999-007  02/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE

LANSING CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-08-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Lansing Middle School:
90-0787   Reconstruction               0-001-004  01/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1750   Reconstruction               0-001-005  07/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0623   Reconstruction               0-001-006  03/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0081   Additions and Alterations    0-001-007  09/05/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0993   Reconstruction               0-001-009  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1098   Reconstruction               0-001-010  12/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -678                  03/29/02   05/23/02    Maines Paper and Food Services      
                                                            2              18,584                  06/17/03   06/17/03    Kimble                              
                                                            3                 604                  03/15/02   04/29/02    Maines Paper and Food Services      
                                                            4               7,700                  03/15/02   04/29/02    Madonia Elec.                       
                                                            4                   0                  05/31/02   08/15/02    Maines Paper and Food Service       
                                                            5               2,612                  05/08/02   05/20/02    Daniel Lynch                        
                                                            6               7,000                  05/08/02   05/20/02    Daniel Lynch                        
                                                            7               4,824                  02/28/02   05/22/02    Madonia Elec.                       
 
12-0723   Reconstruction               0-001-011  04/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02          -5,000                  01/16/14   02/20/14    MCK Building Associates, Inc.       
                                                            GC-08          -3,551                  04/10/14   05/08/14    MCK Building Associates, Inc.       
 
05-0022   Reconstruction               0-001-012  07/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC 01        -7,401                  04/19/06   06/30/06    Kimble Inc                          
 
04-0936   Reconstruction               0-001-013  03/28/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-02           8,198                  12/09/05   06/26/06    Apple Roofing Corp                  
                                                            RC04            2,012                  01/24/06   07/24/06    Apple roofing Corp                  
 
08-1153   Reconstruction               0-001-014  07/24/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0564   Reconstruction               0-001-015  04/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-004         17,188                  02/22/12   07/17/12    WEYDMAN ELECTRIC                    
 
12-0141   Reconstruction               0-001-016  07/01/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0230   Reconstruction               0-001-017  02/11/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0195   Reconstruction               0-001-018  01/26/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-02          18,986                  09/09/15   09/18/15    John Mills Electric, Inc.           
                                                            EC-03          19,408                  09/09/15   09/18/15    John Mills Electric, Inc.           
                                                            EC-04          14,206                  09/09/15   09/18/15    John Mills Electric, Inc.           
                                                            EC-05          23,728                  09/09/15   10/28/15    John Mills Electric, Inc.           
                                                            EC-06          18,975           3,855  12/24/15   01/11/16    JOHN MILLS ELECTRIC,INC             
                                                            EC-09          11,263                  02/23/16   03/09/16    John Mills Electric, Inc.           
                                                            EC-14           3,467                  04/12/16   04/21/16    John Mills Electric, Inc.           
                                                            EC-15           8,338                  07/11/16   10/28/16    John Mills Electric, Inc.           
                                                            GC-01          15,747                  09/16/15   11/17/15    Landmark Enterprises                
                                                            GC-02          14,133                  09/16/15   10/07/15    Landmark Enterprises                
                                                            GC-03          11,765                  09/16/15   10/01/15    Landmark Enterprises                
                                                            GC-04          19,565                  09/16/15   11/17/15    Landmark Enterprises                
                                                            GC-05           3,540                  09/16/15     /  /      Landmark Enterprises                
                                                            GC-08          15,945                  10/08/15   10/28/15    Landmark Enterprises                
                                                            GC-09          24,088                  10/08/15   10/28/15    Landmark Enterprises                
                                                            GC-15          21,023                  11/09/15   12/23/15    Landmark Enterprises                
                                                            GC-16          17,545           4,558  11/23/15   01/07/16    Landmark Enterprises                
                                                            GC-17           3,172                  01/22/16   02/04/16    Landmark Enterprises                
                                                            GC-18           4,444                  01/22/16   02/04/16    Landmark Enterprises                
                                                            GC-19          11,902                  01/22/16   02/04/16    Landmark Enterprises                
                                                            GC-20          19,172                  01/22/16   03/01/17    Landmark Enterprises                
                                                            GC-21          10,054                  01/22/16   03/20/17    Landmark Enterprises                
                                                            GC-22          11,131                  02/23/16   03/09/16    Landmark Enterprises                
                                                            GC-26           2,791                  04/08/16   05/10/16    Landmark Enterprises                
                                                            GC-36          22,973                  06/06/16   07/19/16    LANDMARK ENTERPRISES                
                                                            GC-37          16,406                  06/06/16   07/19/16    LANDMARK ENTERPRISES                
                                                            GC-42             567                  07/11/16   03/20/17    Landmark Enterprises                
                                                            PC-01          13,405                  09/16/15   10/01/15    Petcosky & Sons Plumbing and Heating
                                                            PC-02          21,535                  09/16/15   11/16/15    Petcosky & Sons Plumbing & Heating  
                                                            PC-03           3,772                  12/28/15   01/12/16    Petcosky & Sons Plumbing and Heating
                                                            PC-04          11,802                  03/07/17   06/06/17    Petcosky & Sons Plumbing & Heating  
 
14-1652   Additions and Alterations    0-001-019  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           3,910                  10/05/16   12/29/17    John Mills Electric, Inc.           
                                                            EC-04           1,454                  10/27/16   11/17/16    John Mills Electric, Inc.           
                                                            EC-05          11,739                  11/16/16   01/09/17    John Mills Electric, Inc.           
                                                            EC-08           3,804                  11/22/16   01/09/17    John Mills Electric, Inc.           
                                                            EC-11           7,859                  01/23/17   02/15/17    John Mills Electric, Inc.           
                                                            EC-15             810                  03/15/17   04/13/17    John Mills Electric, Inc.           
                                                            EC-17           7,953                  03/15/17   04/13/17    John Mills Electric, Inc.           
                                                            EC-21           8,995                  04/11/17   04/21/17    John Mills Electric, Inc.           
                                                            EC-23             689                  06/01/17   06/07/17    John Mills Electric, Inc.           
                                                            GC-01             -86                  08/25/16   10/06/16    Streeter Associates, Inc.           
                                                            GC-04           2,983                  09/26/16   10/17/16    Streeter Associates, Inc.           
                                                            GC-08           3,534                  10/14/16   10/21/16    Streeter Associates, Inc.           
                                                            GC-11           7,441                  10/28/16   11/17/16    Streeter Associates, Inc.           
                                                            GC-12             587                  11/16/16   11/23/16    Streeter Associates, Inc.           
                                                            GC-17           8,534                  01/13/17   01/27/17    Streeter Associates, Inc.           
                                                            GC-18          12,899                  01/13/17   01/27/17    Streeter Associates, Inc.           
                                                            GC-19          18,221                  01/13/17   01/27/17    Streeter Associates, Inc.           
                                                            GC-21          18,864                  02/27/17   03/06/17    Streeter Associates, Inc.           
                                                            GC-23          12,163                  02/27/17   03/06/17    Streeter Associates, Inc.           
                                                            GC-24           1,145                  02/27/17   03/06/17    Streeter Associates, Inc.           
                                                            GC-27           1,444                  03/15/17   03/30/17    Streeter Associates, Inc.           
                                                            GC-28           2,798                  05/10/17   05/15/17    Streeter Associates, Inc.           
                                                            GC-31          -5,096                  06/01/17   06/23/17    Streeter Associates, Inc.           
                                                            MC-02           9,926                  11/03/16   11/07/16    Louis N. Picciano & Son, Inc.       
                                                            MC-06           5,303                  01/23/17   02/16/17    Louis N. Picciano & Son, Inc.       
                                                            MC-08           1,944                  02/27/17   04/13/17    Louis N. Picciano & Son, Inc.       
                                                            MC-12           1,179                  06/01/17   06/07/17    Louis N. Picciano & Son, Inc.       
                                                            PC-03             268                  11/07/16   11/22/16    Frey & Campbell, inc.               
                                                            PC-04             495                  11/16/16   11/23/16    Frey & Campbell, Inc.               
                                                            PC-06           7,075                  01/17/17   01/20/17    Frey & Campbell, Inc.               
 
16-2126   Reconstruction               0-001-020  03/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          20,106                  09/14/18   10/22/18    MALCO ELECTRIC CORP.                
                                                            GC-02          -3,800                  08/09/18   09/06/18    STREETER ASSOCIATES INC             
                                                            GC-03           1,928                  09/14/18   11/26/18    STREETER ASSOCIATES                 
                                                            GC-04           2,943                  10/09/18   11/28/18    STREETER ASSOCIATES INC             
                                                            MC-01          -1,432                  08/09/18   08/28/18    FREY & CAMPBELL INC                 
                                                            PC-02             328                  11/13/18   01/16/19    FREY & CAMPBELL, INC.               
 
18-2049   Reconstruction               0-001-021  08/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          15,574                  12/11/20   02/25/21    MATCO ELECTRIC CORP.                
                                                            EC-04           3,745                  03/12/21   05/05/21    MATCO ELECTRIC CORP.                
                                                            EC-08          34,275                  05/18/21   08/16/21    MATCO ELECTRIC CORP.                
                                                            EC-10           8,615                  11/12/21   12/09/22    Matco Electric Corp                 
                                                            EC-13          10,633                  11/12/21   12/09/22    Matco Electric Corp.                
                                                            GC-02             284                  12/11/20   03/09/21    STREETER ASSOCIATES, INC.           
                                                            GC-03           2,202                  03/10/21   06/28/21    STREETER ASSOCIATES, INC.2202       
                                                            GC-09           9,916                  11/05/21     /  /      Streeter Associates, Inc            
                                                            GC-11           5,525                  02/09/22   02/13/23    Streeter Assocs Inc                 
                                                            MC-01          28,870                  09/22/21   11/30/22    Kimble, Inc                         
 
02-0877FP Reconstruction               0-001-FP1  01/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Technology Building:
12-0738   Reconstruction               0-002-003  04/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01            -800                  01/16/14   02/14/14    MCK Building Associates, Inc.       
                                                            GC-02          -5,607                  04/10/14   04/30/14    MCK Building Associates, Inc.       
 
14-1653   Reconstruction               0-002-005  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-06           2,500                  11/16/16   01/10/17    John Mills Electric, Inc.           
                                                            EC-12           1,843                  01/23/17   02/15/17    John Mills Electric, Inc.           
                                                            MC-01           8,961                  11/03/16   11/07/16    Louis N. Picciano & Son, Inc.       
                                                            MC-07          -1,126                  01/23/17   02/16/17    Louis N. Picciano & Son, Inc.       
                                                            PC-02           1,292                  11/04/16   11/22/16    Frey & Campbell, Inc.               
                                                            PC-07           6,011                  01/17/17   01/20/17    Frey & Campbell, Inc.               
 
18-2050   Reconstruction               0-002-006  08/30/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lansing Elementary:
92-0624   Reconstruction               0-003-002  03/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0082   Additions and Alterations    0-003-003  09/05/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0994   Reconstruction               0-003-005  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1099   Reconstruction               0-003-006  12/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -653                  01/22/02   05/13/02    Siracusa Mech.                      
                                                            1               3,000                  01/30/02   03/22/02    Madonia Elec.                       
                                                            1               2,245                  09/18/01   03/31/05    Kimble Inc                          
                                                            2             -12,600                  01/09/02   01/09/02    Daniel Lynch                        
                                                            2                -653                  01/22/02   05/13/02    Maines Paper & Food Services        
                                                            2               5,237                  02/04/02   03/21/02    Madonia Elec.                       
                                                            2              10,725                  01/30/02   03/22/02    Siracusa Mech.                      
                                                            3               7,819                  02/04/02   03/21/02    Daniel Lynch                        
                                                            3                -653                  04/10/02   05/28/02    Kimble, Inc.                        
                                                            4               9,717                  12/13/01   03/27/02    Daniel Lynch                        
                                                            4               3,058                  04/10/02   05/28/02    Kimble, Inc.                        
                                                            5              13,133                  01/22/02   05/13/02    Madonia Elec.                       
                                                            6                -653                  04/10/02   05/28/02    Madonia Elec.                       
                                                            7               7,231                  09/23/02   09/23/02    Daniel Lynch                        
                                                            8               1,550                  09/12/02   10/22/02    Daniel Lynch                        
 
99-0060   Reconstruction               0-003-007  10/04/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0937   Reconstruction               0-003-008  03/28/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01             -71                  12/09/05   12/15/05    Apple Roofing                       
 
08-1154   Reconstruction               0-003-009  07/24/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1279   Reconstruction               0-003-010  03/31/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          -1,512                  10/08/09   10/30/09    WELCH CONSTRUCTION INC              
                                                            RC-02          15,932                  11/23/09   12/16/09    WELCH CONSTRUCTION INC              
                                                            RC-03          -5,367                  01/11/10   03/01/10    WELCH CONSTRUCTION INC              
                                                            RC-04           1,105                  09/07/10   09/27/10    WELCH CONSTRUCTION INC              
 
10-0565   Reconstruction               0-003-011  04/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-005          4,298                  02/22/12   07/17/12    WEYDMAN ELECTRIC                    
                                                            GC-002        -42,816                  09/28/12   02/25/13    EDGER ENTERPRISES OF ELMIRA INC     
                                                            MC-001              0                  09/06/11   10/03/11    CLIMATE CONTROL TECHNOLOGIES        
                                                            MC-002        -33,350                  10/05/12   06/28/13    CLIMATE CONTROL TECHNOLOGIES        
                                                            PC-001           -266                  09/28/12   06/28/13    KIMBLE INC                          
 
12-0724   Reconstruction               0-003-012  04/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-03          -1,062                  01/16/14   02/20/14    MCK Building Associates, Inc.       
 
14-0196   Reconstruction               0-003-013  01/26/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           5,145                  09/09/15   10/28/15    John Mills Electric, Inc.           
                                                            EC-07           2,817                  12/24/15   01/11/16    JOHN MILLS ELECTRIC,INC             
                                                            EC-11           6,616                  02/23/16   03/09/16    John Mills Electric, Inc.           
                                                            EC-12           6,963                  04/12/16   04/21/16    John Mills Electric, Inc.           
                                                            EC-16           1,140                  07/11/16   10/28/16    John Mills Electric, Inc.           
                                                            GC-06          33,944                  10/08/15   10/28/15    Landmark Enterprises                
                                                            GC-07          17,415                  10/08/15   03/06/17    Landmark Enterprises                
                                                            GC-12          24,806                  10/13/15   11/03/15    Landmark Enterprises                
                                                            GC-13          28,481                  10/13/15   11/03/15    Landmark Enterprises                
                                                            GC-14          19,018                  11/09/15   11/30/15    Landmark Enterprises                
                                                            GC-23          13,197                  02/23/16   03/09/16    Lankmark Enterprises                
                                                            GC-25          11,299                  04/08/16   05/19/16    Landmark Enterprises                
                                                            GC-33          16,440                  03/07/17   06/06/17    Landmark Enterprises                
                                                            GC-34          23,639                  06/06/16   07/19/16    LANDMARK ENTERPRISES                
                                                            GC-35           2,412                  06/06/16   07/19/16    LANDMARK ENTERPRISES                
                                                            GC-41           2,017                  07/11/16   10/28/16    Landmark Enterprises                
                                                            GC-43           1,680                  08/01/16   09/30/16    Landmark Enterprises                
 
14-0420   Reconstruction               0-003-014  03/31/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0541   Reconstruction               0-003-015  10/13/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1654   Reconstruction               0-003-016  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-09           3,247                  01/23/17   02/15/17    John Mills Electric, Inc.           
                                                            EC-14             751                  03/15/17   04/13/17    John Mills Electric, Inc.           
                                                            EC-16             453                  03/15/17   04/13/17    John Mills Electric, Inc.           
                                                            EC-22             786                  04/11/17   04/21/17    John Mills Electric, Inc.           
                                                            GC-03           8,544                  09/26/16   10/17/16    Streeter Associates, Inc.           
                                                            GC-06           8,085                  09/26/16   10/17/16    Streeter Assosiates, Inc.           
                                                            GC-07             466                  10/14/16   10/21/16    Streeter Associates, Inc.           
                                                            GC-16          15,949                  01/13/17   01/27/17    Streeter Associates, Inc.           
                                                            GC-20           6,775                  02/27/17   03/06/17    Streeter Associates, Inc.           
                                                            MC-03          14,685                  11/16/16   01/10/17    Louis N. Picciano & Son, Inc.       
                                                            MC-13          11,192                  06/01/17   06/07/17    Louis N. Picciano & Son, Inc.       
 
16-2127   Reconstruction               0-003-017  03/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -1,267                  08/09/18   08/28/18    MATCO ELECTRIC CORP                 
                                                            GC-01         -10,157                  08/09/18   09/06/18    STREET ASSOCIATES INC               
                                                            GC-08             237                  12/09/19   01/07/20    STREETER ASSOCIATES, INC.           
                                                            MC-02            -175                  09/17/18   11/30/18    FREY & CAMPBELL INC                 
 
18-2048   Additions and Alterations    0-003-018  08/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           5,978                  12/11/20   02/25/21    MATCO ELECTRIC CORP.                
                                                            EC-05             768                  03/12/21   05/05/21    MATCO ELECTRIC CORP.                
                                                            EC-07           9,680                  05/18/21   08/16/21    MATCO ELECTRIC CORP.                
                                                            EC-11             537                  11/12/21   12/12/22    Matco Electric Corp                 
                                                            EC-12           1,903                  11/12/21   12/12/22    Matco Electric Corp                 
                                                            EC-16           1,068                  11/12/21   12/12/22    Matco Electric Corp                 
                                                            EC-17          11,346                  11/12/21   12/13/22    Matco Electric Corp                 
                                                            GC-01           1,812                  12/11/20   03/09/21    STREETER ASSOCIATES, INC.           
                                                            GC-04          28,206                  03/10/21   06/28/21    STREETER ASSOCIATES, INC.           
                                                            GC-05           5,375                  03/10/21   06/28/21    STREETER ASSOCIATES, INC.           
                                                            GC-06             428                  05/18/21   06/08/21    STREETER ASSOCIATES, INC.           
                                                            GC-07           3,069                  11/05/21   12/07/22    Streeter Associates, Inc            
                                                            PC-01          -5,000                  11/22/21     /  /      AFT Mech LLC                        
                                                            PC-01          -5,000                  11/22/21   12/14/22    AFT Mechanical, LLC                 
 
02-0878FP Reconstruction               0-003-FP1  01/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High:
92-0625   Reconstruction               0-004-002  03/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0401   Reconstruction               0-004-003  11/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0083   Alterations                  0-004-004  09/05/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0995   Reconstruction               0-004-006  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1100   Reconstruction               0-004-007  12/13/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0247   Reconstruction               0-004-008  09/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0006   Reconstruction               0-004-009  07/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-1            3,054                  01/06/03   01/14/03    J&K Plumbing                        
 
02-1915   Reconstruction               0-004-010  05/06/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-1           -1,937                  11/10/03   11/14/03    John R Walkins                      
 
04-0938   Reconstruction               0-004-011  03/28/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-03         -17,039                  12/09/05   06/26/06    Apple Roofing Corp                  
                                                            RC-05         -10,080                  01/24/06   05/26/06    APPLE ROOFING, CORP                 
                                                            RC-06          -2,066                  02/06/06   05/25/06    Apple roofing Corp                  
 
08-1155   Reconstruction               0-004-012  07/24/09  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0592   Reconstruction               0-004-013  01/02/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0566   Reconstruction               0-004-015  04/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001        -30,623                  01/05/12   07/17/12    Tetra Tech Architects & Engineers   
                                                            EC-002          8,213                  02/22/12   07/17/12    WEYDMAN ELECTRIC                    
                                                            EC-003         21,486                  02/22/12   07/17/12    WEYDMAN ELECTRIC                    
                                                            EC-006         66,189                  02/22/12     /  /      WEYDMAN ELECTRIC                    
                                                            EC-007         11,872                  02/29/12   09/07/12    WEYDMAN ELECTRIC                    
                                                            EC-008         -1,343                  05/23/13   06/28/13    Weydman Electric                    
                                                            GC-001              0                  09/28/12   02/25/13    EDGER ENTERPRISES OF ELMIRA INC     
                                                            MC-003         -3,765                  09/03/13   02/20/14    Climate Control Technologies, Inc.  
 
12-0725   Reconstruction               0-004-016  04/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -26,250                  01/16/14   02/20/14    MCK Building Associates, Inc.       
                                                            GC-04          -9,406                  01/16/14   02/20/14    MCK Building Associates, Inc.       
                                                            GC-05           7,240                  02/03/14   02/24/14    MCK BUILDING ASSOCIATES INC         
                                                            GC-07             245                  04/10/14   05/08/14    MCK Building Associates, Inc.       
 
13-0110   Reconstruction               0-004-017  06/23/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0197   Reconstruction               0-004-018  01/26/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-08           9,507                  12/24/15   01/11/16    JOHN MILLS ELECTRIC,INC             
                                                            EC-10           2,445                  02/23/16   03/09/16    John Mills Electric, Inc.           
                                                            EC-13          10,382                  04/12/16   04/21/16    John Mills Electric, Inc.           
                                                            EC-17           4,637                  08/26/16   10/28/16    John Mills Electric, Inc.           
                                                            EC-40          19,556                  07/11/16   10/28/16    Landmark Enterprises                
                                                            GC-030         15,531                  04/08/16   07/07/16    Landmark Enterprises                
                                                            GC-05           3,540                  09/16/15   10/07/15    Landmark Enterprises                
                                                            GC-10          11,042                  10/08/15   10/28/15    Landmark Enterprises                
                                                            GC-11          18,768                  10/08/15   10/28/15    Landmark Enterprises                
                                                            GC-24           3,139                  02/23/16   03/09/16    Landmark Enterprises                
                                                            GC-27           2,963                  04/08/16   05/10/16    Landmark Enterprises                
                                                            GC-28          22,450                  04/08/16   07/07/16    Landmark Enterprises                
                                                            GC-29          23,474                  04/08/16   07/07/16    Landmark Enterrises                 
                                                            GC-31          23,306                  04/08/16   07/07/16    Landmark Enterprises                
                                                            GC-32           2,122                  04/12/16   04/21/16    Landmark Enterprises                
                                                            GC-38          23,355                  06/06/16   07/19/16    LANDMARK ENTERPRISES                
                                                            GC-39           2,412                  06/06/16   07/19/16    LANDMARK ENTERPRISES                
                                                            GC-44           3,829                  08/01/16   09/30/16    Landmark Enterprises                
                                                            GC-45           1,854                  08/25/16   09/29/16    Landmark Enterprises                
                                                            PC-05             227                  01/19/16   02/16/16    Petcosky & Sons Plumbing and Heating
                                                            PC-06             508                  03/24/16   04/11/16    Petcosky & Sons Plumbing and Heating
 
14-1655   Reconstruction               0-004-019  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -2,134                  08/25/16   10/06/16    John Mills Electric, Inc.           
                                                            EC-07           3,428                  11/22/16   01/06/17    John Mills Electric, Inc.           
                                                            EC-18           1,075                  03/15/17   04/13/17    John Mills Electric, Inc.           
                                                            EC-19           7,917                  04/11/17   04/21/17    John Mills Electric, Inc.           
                                                            EC-20          11,908                  04/11/17   04/21/17    John Mills Electric, Inc.           
                                                            GC-02            -150                  08/25/16   10/06/16    Streeter Associates, Inc.           
                                                            GC-05          11,886                  09/26/16   10/17/16    Streeter Associates, Inc.           
                                                            GC-09           2,245                  10/14/16   10/21/16    Streeter Associates, Inc.           
                                                            GC-10           4,304                  10/14/16   10/21/16    Streeter Associates, Inc.           
                                                            GC-13           2,081                  11/16/16   11/25/16    Streeter Associates, Inc.           
                                                            GC-14          17,232                  11/22/16   12/27/16    Streeter Associates, Inc.           
                                                            GC-15           2,283                  01/13/17   01/27/17    Streeter Associates, Inc.           
                                                            GC-22           4,390                  02/27/17   03/06/17    Streeter Associates, Inc.           
                                                            GC-25           4,595                  02/27/17   03/06/17    Streeter Associates, Inc.           
                                                            GC-26          20,298                  02/27/17   03/06/17    Streeter Associates, Inc.           
                                                            GC-29          -1,106                  05/15/17   05/19/17    Streeter Associates, Inc.           
                                                            GC-30           1,075                  06/01/17   06/23/17    Streeter Associates, Inc.           
                                                            MC-04           2,325                  11/16/16   01/10/17    Louis N. Picciano & Son, Inc.       
                                                            MC-05           5,456                  11/22/16   01/06/17    Louis Picciano & Sons, Inc.         
                                                            MC-10             827                  03/15/17   04/13/17    Louis N. Picciano & Son, Inc.       
                                                            MC-11          15,240                  06/01/17   06/07/17    Louis N. Picciano & Son, Inc.       
                                                            PC-01             190                  11/03/16   11/07/16    Frey & Campbell, Inc.               
                                                            PC-05           1,661                  11/16/16   01/10/17    Frey & Campbell, Inc.               
                                                            PC-08            -389                  01/17/17   01/20/17    Frey & Campbell, Inc.               
                                                            PC-09           5,932                  07/24/17   09/06/17    Frey & Campbell, Inc.               
 
15-0640   Reconstruction               0-004-020  01/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2128   Additions and Alterations    0-004-021  03/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03            -411                  09/14/18   10/22/18    MALCO ELECTRIC CORPORATION          
                                                            EC-04           1,713                  01/25/19   02/22/19    MATCO ELECTRIC CORP.                
                                                            EC-05           5,357                  04/15/19   04/16/19    MALCO ELECTRIC CORP.                
                                                            EC-06            -627                  06/26/19   07/01/19    MATCO ELECTRIC CORP.                
                                                            GC-05          -5,077                  08/30/19   09/24/19    STREETER ASSOCIATES, INC.           
                                                            GC-06         -27,362                  09/11/19   09/24/19    STREETER ASSOCIATES, INC.           
                                                            GC-07             816                  12/09/19   01/07/20    STREETER ASSOCIATES, INC.           
                                                            MC-03          -1,026                  01/25/19   02/22/19    FREY & CAMPBELL, INC.               
                                                            MC-04         -21,768                  09/09/19   09/10/19    FREY & CAMPBELL, INC.               
                                                            PC-01          -8,483                  09/17/18   11/30/18    FREY & CAMPBELL INC                 
                                                            PC-03           1,894                  11/13/18   01/15/19    FREY & CAMPBELL, INC.               
                                                            PC-04            -401                  06/26/19   07/01/19    FREY & CAMPBELL, INC.               
 
16-1367   Reconstruction               0-004-022  03/16/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           2,900                  07/24/17   07/28/17    Streeter Associates, Inc.           
                                                            GC-02          -4,054                  09/07/17   10/10/17    Streeter Associates, Inc.           
                                                            PSC-01           -171                  07/31/17   08/02/17    William L. Watson Co., Inc.         
 
17-1591   Reconstruction               0-004-023  04/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1590   Reconstruction               0-004-024  05/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1399   Reconstruction               0-004-025  04/02/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2051   Reconstruction               0-004-026  08/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           4,246                  12/11/20     /  /      MATCO ELECTRIC CORP.                
                                                            EC-06             466                  03/12/21   05/05/21    MATCO ELECTRIC CORP.                
                                                            EC-14           1,834                  11/12/21   12/12/22    Matco Electric Corp                 
                                                            EC-15           1,723                  11/12/21   12/12/22    Matco Electric Corp                 
                                                            EC-18           3,618                  06/05/23   12/28/23    MATCO ELECTRIC CORP                 
                                                            GC-08          20,000                  11/05/21   12/07/22    Streeter Associates, Inc            
                                                            GC-10            -126                  11/22/21   12/22/22    Streeter Assoc Inc                  
                                                            MC-02           7,871                  03/25/22   01/31/23    Kimble Inc                          
 
19-1459   Reconstruction               0-004-027  07/27/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1369FP Reconstruction               0-004-FP1  03/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Former District Office:
92-0626   Reconstruction               1-005-001  03/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2052   Reconstruction               1-005-005  08/30/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Grounds Building II:
14-1656   Reconstruction               3-013-002  03/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2053   Reconstruction               3-013-003  08/30/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Maintenance Garage:
92-0402   Reconstruction               5-006-002  11/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0784   Reconstruction               5-006-003  03/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0280   Reconstruction               5-006-004  01/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            #2             19,219                  01/30/02   03/22/02    Gary Dyer Excavating                
                                                            1              -6,495                  02/04/02   03/21/02    Gary Dyer Excavating                
 
04-0939   Reconstruction               5-006-007  03/28/05  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1657   Reconstruction               5-006-009  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          -1,326                  08/25/16   10/06/16    John Mills Electric, Inc.           
                                                            EC-13          11,053                  01/23/17   02/15/17    John Mills Electric, Inc.           
 
16-1489   Reconstruction               5-006-010  06/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2054   Reconstruction               5-006-011  08/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-09           8,134                  05/18/21   08/16/21    MATCO ELECTRIC CORP.                
 
19-1302   Reconstruction               5-006-012  02/11/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1667   Reconstruction               5-006-013  03/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
96-0996   New Construction             7-011-001  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Outdoor bleacher/press box:
96-0997   New Construction             7-012-001  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Shade Structure @ Buckley ES:
16-2129   New Construction             7-014-001  03/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
17-1836   Reconstruction               7-999-002  03/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE

NEWFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-09-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Newfield Elementary:
96-0972   Reconstruction               0-001-007  04/18/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3             2,713                  12/06/02   12/09/02    Nelson Elec.                        
                                                            E-4            17,331                  12/06/02   12/09/02    Nelson Elec.                        
                                                            G1-5           30,817                  12/06/02   12/09/02    Welliver McGuire                    
                                                            G1-7           14,623                  12/06/02   12/09/02    Welliver McGuire                    
                                                            H-2             6,110                  12/06/02   12/09/02    Kimble, Inc.                        
 
93-1174   Reconstruction               0-001-008  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0732   Reconstruction               0-001-009  04/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1              400                  06/12/01   01/10/02    Blanding Elec.                      
                                                            EC-3           27,500                  05/31/02   08/15/02    Blanding Elec.                      
                                                            EC-5           10,815                  05/31/02   08/15/02    Blanding Elec.                      
                                                            EC-6          -10,000                  07/24/02   08/16/02    Blanding Elec.                      
                                                            FS-3              275                  12/27/01   05/28/02    Maines Paper & Food Service         
                                                            GC-3            1,984                  08/07/02   10/30/02    SA Hovanec                          
                                                            GC-4          -27,756                  08/07/02   10/30/02    SA Hovanec                          
                                                            GYM-1           9,969                  12/20/01   05/29/02    BR Johnson                          
                                                            HC-4            3,963                  02/27/02   05/06/02    Piccirilli-Slavik                   
                                                            HC-5           -1,719                  07/24/02   08/16/02    Piccirilli-Slavik                   
                                                            PC-1           -1,085                  06/12/01   01/09/02    Piccirilli-Slavik                   
                                                            PC-3            5,641                  01/11/01   01/09/02    Piccirilli-Slavik                   
                                                            PC-6           -7,651                  03/28/02   05/06/02    Piccirilli-Slavik                   
                                                            RC-2rev        12,488                  06/13/02   11/04/02    J&B Installations                   
                                                            SC-2          155,000                  05/31/02   08/15/02    Calvin Cole                         
                                                            SC-3            9,390                  05/31/02   08/15/02    Calvin Cole                         
                                                            SC-4            3,509                  01/17/02   05/27/03    Calvin Cole                         
                                                            SC-5           39,225                  08/29/02   10/29/02    Calvin Cole                         
                                                            TC-1           -5,000                  01/17/02   03/29/02    Richardson Bros. Elec.              
 
07-1106   Reconstruction               0-001-010  05/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             808                  02/14/11   03/08/11    MATCO ELECTRIC CORPORATION          
                                                            EC-02           2,609                  05/06/09   07/28/09    MATCO ELECTRIC CORPORATION          
                                                            EC-06           4,179                  02/08/10   03/10/10    MATCO ELECTRIC CORPORATION          
                                                            EC-08           8,436                  02/08/10   03/10/10    MATCO ELECTRIC CORPORATION          
                                                            GC-01          59,555                  10/04/10   10/21/10    PAUL J YAMAN INC                    
                                                            GC-02          -2,790                  10/09/09   11/06/09    FAHS CONSTRUCTION                   
                                                            GC-02             543                  02/22/11   05/04/11    PAUL J YAMAN INC                    
                                                            GC-06          14,452                  10/19/09   11/12/09    FAHS CONSTRUCTION                   
                                                            GC-11             731                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-16         -12,768                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-19           1,161                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            HC-01            -731                  03/14/11   05/13/11    KIMBLE INC                          
                                                            PC-01           4,083                  08/14/09   01/08/10    KIMBLE INC                          
                                                            RC-01            -330                  01/19/10   03/04/10    DIAMOND ROOFING CO INC              
 
11-0382   Reconstruction               0-001-011  02/03/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02            -219                  11/09/12   07/25/13    Matco Electrical Corp               
 
13-0358   Reconstruction               0-001-012  04/23/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           3,000                  10/29/14   11/05/14    Blanding Electric, Inc.             
                                                            EC-05               0                  04/13/15   04/23/15    Blanding Electric Inc.              
                                                            GC-02          36,000                  11/03/14   11/12/14    Streeter Associates, Inc.           
                                                            GC-03           6,484                  11/24/14   02/06/15    Streeter Assoicates, Inc.           
                                                            GC-04               0                  03/05/15   03/25/15    Streeter Associates, Inc.           
 
14-1629   Reconstruction               0-001-014  07/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1524   Reconstruction               0-001-015  05/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAGC002             0                  05/25/17   06/01/17    Bolands Excavating & Topsoil, Inc.  
                                                            GC-002         -2,194                  05/12/17   05/18/17    Bolands Excavating & Topsoil, Inc.  
 
16-0618   Reconstruction               0-001-016  11/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -11,697                  05/24/18   07/24/18    WINDOW SPECIALIST, INC.             
 
16-2109   Reconstruction               0-001-017  05/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002           -970                  05/30/19   05/31/19    DIEKOW ELECTRIC, INC.               
                                                            EC-003         12,574                  05/30/19   05/31/19    DIEKOW ELECTRIC, INC.               
                                                            EC-004         16,947                  05/30/19   05/31/19    DIEKOW ELECTRIC, INC.               
                                                            EC-005         11,775                  05/30/19   05/31/19    DIEKOW ELECTRIC, INC.               
                                                            EC-012          5,239                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-016         11,221                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-022          9,151                  07/27/20   10/27/20    DIEKOW ELECTRIC, INC.               
                                                            GC-017            961                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-021          1,484                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-040          2,352                  03/02/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-043          6,434                  11/16/20   02/24/21    FAHS CONSTRUCTION GROUP             
                                                            GC-051           -483                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-052         -4,849                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            HC-002          9,530                  11/16/20   02/12/21    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-008          2,820                  02/13/20   03/20/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-012         15,535                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-014         17,100                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-014         17,100                  12/27/21   10/20/22    Piccirilli&Vincent Plumb&Heat Inc   
                                                            HC-015         29,276                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-015         29,277                  12/27/21     /  /      Piccirilli&Vincent Plumb&Heat Inc   
                                                            HC-016          3,018                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-017         20,245                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-018          7,238                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-019          4,346                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-020         16,803                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            PC-005            272                  02/28/20   07/02/20    FREY & CAMPBELL, INC.               
 
18-0175   Reconstruction               0-001-018  03/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         14,387                  10/11/19   12/16/19    FAHS CONSTRUCTION GROUP             
 
02-0688FP Reconstruction               0-001-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0280SC Visual Structural Inspection 0-001-SC1  09/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Junior/Senior High School:
91-1368   Reconstruction               0-005-003  06/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0973   Additions and Alterations    0-005-004  04/18/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3             5,691                  12/06/02   12/09/02    Nelson Elec.                        
                                                            G1-5            8,040                  12/06/02   12/09/02    Welliver McGuire                    
                                                            G1-7              -44                  12/06/02   12/09/02    Welliver McGuire                    
                                                            H-2            33,412                  12/06/02   12/09/02    Kimble, Inc.                        
 
99-0733   Reconstruction               0-005-005  04/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-4           38,744                  02/07/03   02/24/03    Blanding Elec.                      
                                                            GC-4          -22,756                  12/10/02   01/09/03    SA Hovanec                          
                                                            GC-5            1,807                  11/12/02   01/02/03    SA Hovanec                          
                                                            HC-2           16,661                  12/06/01   04/05/02    Piccirilli-Slavik                   
 
07-1107   Additions and Alterations    0-005-006  05/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,091                  12/24/08   06/24/09    MATCO ELECTRIC CORPORATION          
                                                            EC-03           1,309                  10/22/09   12/04/09    MATCO ELECTRIC CORPORATION          
                                                            EC-04           7,140                  11/04/09   01/19/10    MATCO ELECTRIC CORPORATION          
                                                            EC-05           4,665                  06/16/11   06/20/11    MATCO ELECTRIC CORPORATION          
                                                            EC-07           8,642                  02/08/10   03/10/10    MATCO ELECTRIC CORPORATION          
                                                            EC-09           4,768                  02/08/10   03/10/10    MATCO ELECTRIC CORPORATION          
                                                            EC-10            -804                  02/08/10   03/10/10    MATCO ELECTRIC CORPORATION          
                                                            EC-11           2,060                  02/08/10   03/10/10    MATCO ELECTRIC CORPORATION          
                                                            EC-12          -3,136                  06/16/11   06/20/11    MATCO ELECTRIC CORPORATION          
                                                            GC-03          21,777                  10/09/09   11/06/09    FAHS CONSTRUCTION                   
                                                            GC-04             786                  10/09/09   11/06/09    FAHS CONSTRUCTION                   
                                                            GC-07           8,032                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-09             101                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-12           2,476                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-13           4,315                  05/23/11   06/08/11    FAHS CONSTRUCTION                   
                                                            GC-14          13,616                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-15          13,550                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-18           9,850                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            GC-20           7,689                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
                                                            HC-02           5,173                  03/14/11   05/13/11    KIMBLE INC                          
                                                            HC-03          -8,513                  03/14/11   05/13/11    KIMBLE INC                          
                                                            HC-04             332                  03/24/11   05/12/11    KIMBLE INC                          
                                                            HC-04            -332                  04/25/11   05/16/11    KIMBLE INC                          
                                                            PC-02          -2,476                  03/11/11   05/13/11    KIMBLE INC                          
                                                            PC-03          -2,015                  03/11/11     /  /      KIMBLE INC                          
                                                            PC-04            -332                  03/24/11   05/12/11    KIMBLE INC                          
                                                            PC-05          -2,157                  03/24/11   05/12/11    KIMBLE INC                          
                                                            RC-02          -3,210                  12/14/09   02/16/10    KIAMOND ROOFING CO INC              
                                                            RC-03          -6,739                  03/17/10   05/03/10    DIAMOND ROOFING CO INC              
 
11-0109   Reconstruction               0-005-007  09/06/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01          30,467                  01/12/12   07/17/12    PARAGON ENVIRONMENTAL CONSTRUCTION  
 
11-0383   Reconstruction               0-005-008  02/03/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  11/09/12   08/16/13    Matco Electrical Corp               
                                                            GC-01         -20,000                  10/05/12   06/28/13    ELMIRA STRUCTURES INC               
                                                            GC-02         -30,000                  08/12/13   09/19/13    ELMIRA STRUCTURES INC               
 
13-0359   Reconstruction               0-005-009  04/23/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-01          20,000                  09/02/14   11/12/14    Blanding Electric, Inc.             
                                                            EC-01          17,000                  10/29/14   11/05/14    Blanding Electric, Inc.             
                                                            EC-03           4,504                  04/13/15   04/23/15    Blanding Electric Inc.              
                                                            EC-04               0                  04/13/15   04/23/15    Blanding Electric Inc.              
                                                            GC-01          98,000                  09/02/14     /  /      Streeter Associates, Inc.           
                                                            GC-01          62,000                  11/03/14   12/09/15    Streeter Associates, Inc.           
                                                            GC-06           2,418                  03/05/15   03/25/15    Streeter Associates, Inc.           
                                                            HC-01         267,957                  09/29/14   10/03/14    King & King Mechanical, Inc.        
                                                            HC-02           6,303                  03/12/15   03/25/15    King & King Mechanical, Inc.        
                                                            HC-03          -2,088                  09/18/15   11/24/15    King & King Mechanical, Inc.        
                                                            RC-01           9,930                  09/29/14   10/03/14    A.W. Farrell & Sons, Inc.           
                                                            RC-02               0                  06/11/15   06/18/15    A.W. Farrell & Son, Inc.            
 
15-1525   Reconstruction               0-005-011  05/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAGC001             0                  05/25/17   06/01/17    Bolands Excavating & Topsil, Inc.   
                                                            GC-001        221,000                  11/14/16   11/22/16    Bolands Excavating & Topsoil, Inc.  
                                                            GC-003         61,000                  06/14/17   06/23/17    Bolands Excavating & Topsoil, Inc.  
                                                            GC-004         11,370                  06/14/17   06/23/17    Bolands Excavating & Topsoil, Inc.  
                                                            GC-005         17,017                  10/16/17   10/31/17    Bolands Excavating & Topsoil, Inc.  
 
16-1864   Reconstruction               0-005-012  08/15/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          1,400                  03/26/18   03/30/18    Streeter Associates, Inc.           
                                                            GC-002            -57                  03/26/18   03/30/18    Streeter Associates, Inc.           
 
16-2110   Reconstruction               0-005-013  05/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            14,545                  12/27/21   10/20/22    Day Automation                      
                                                            CONT-001         -676                  01/13/20   02/03/20    DAY AUTOMATION                      
                                                            EC-001          9,285                  12/21/18   02/01/19    DIEKOW ELECTRIC, INC.               
                                                            EC-006          2,668                  05/30/19   05/31/19    DIEKOW ELECTRIC, INC.               
                                                            EC-007         15,187                  05/30/19   05/31/19    DIEKOW ELECTRIC, INC.               
                                                            EC-008          5,876                  10/13/20   12/18/20    DIEKOW ELECTRIC, INC.               
                                                            EC-009          5,348                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-010          9,175                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-011          9,420                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-013         14,122                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-014         14,716                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-015         10,493                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-017          9,554                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-018           -676                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-019          8,038                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-020          7,696                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-021          7,476                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-023         -6,001                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            EC-024         -7,428                  06/30/20   07/28/20    DIEKOW ELECTRIC, INC.               
                                                            GC-001         -1,418                  12/06/18   01/23/19    FAHS CONSTRUCTION GROUP             
                                                            GC-002         16,415                  01/22/19   02/25/19    FAHS CONSTRUCTION GROUP             
                                                            GC-003         20,290                  01/22/19   02/25/19    FAHS CONSTRUCTION GROUP             
                                                            GC-004          8,764                  05/30/19   05/31/19    FAHS CONSTRUCTION GROUP             
                                                            GC-005         13,573                  07/19/19   07/22/19    FAHS CONSTRUCTION GROUP             
                                                            GC-006          6,825                  07/19/19   07/22/19    FAHS CONSTRUCTION GROUP             
                                                            GC-007         15,188                  07/19/19   07/22/19    FAHS CONSTRUCTION GROUP             
                                                            GC-008          5,434                  07/19/19   07/22/19    FAHS CONSTRUCTION GROUP             
                                                            GC-009         22,000                  07/19/19   09/18/19    FAHS CONSTRUCTION GROUP             
                                                            GC-010          5,685                  11/04/19   11/06/19    FAHS CONSTRUCTION GROUP             
                                                            GC-011          2,270                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-012          4,057                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-013          2,478                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-014          2,568                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-015          1,495                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-016          5,093                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-018          1,751                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-019          6,224                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-020          2,519                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-022         18,772                  01/13/20   02/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-023            493                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-024          2,109                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-025         15,102                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-026         16,848                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-027          5,433                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-028          2,263                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-029         19,345                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-030          8,151                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-031          6,748                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-032          4,789                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-033          1,997                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-034          1,063                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-035          6,148                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-036            958                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-037          2,794                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-038          2,417                  02/28/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-039          2,870                  03/02/20   07/02/20    FAHS CONSTRUCTION GROUP             
                                                            GC-041          2,375                  03/10/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-042         17,272                  03/10/20   06/30/20    FAHS CONSTRUCTION GROUP             
                                                            GC-044         -2,249                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-045          8,453                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-046          2,013                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-047          8,216                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP.            
                                                            GC-048          1,334                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-049          1,000                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            GC-050         19,581                  06/30/20   08/06/20    FAHS CONSTRUCTION GROUP             
                                                            HC-001         11,880                  10/13/20   12/18/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-003         21,240                  12/09/19   12/20/19    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-004         -1,353                  12/20/19   01/07/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-005          7,514                  12/20/19   01/07/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-006          7,311                  12/20/19   01/07/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-007          1,850                  12/20/19   01/07/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-009         10,424                  02/13/20   03/20/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-010          8,524                  02/13/20   03/20/20    PICCIRILLI-SLEVIK & VINCENT PLUMBING
                                                            HC-011        -12,142                  06/30/20   07/28/20    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            HC-013         15,433                  11/16/20   02/12/21    PICCIRILLI-SLAVIK & VINCENT PLUMBING
                                                            PC-001          8,848                  08/01/19   08/05/19    FREY & CAMPBELL, INC.               
                                                            PC-002         18,470                  09/26/19   09/30/19    FREY & CAMPBELL, INC.               
                                                            PC-003           -676                  02/24/20   06/24/20    FREY & CAMPBELL, INC.               
                                                            PC-004            898                  02/28/20   07/02/20    FREY & CAMPBELL, INC.               
                                                            PC-006           -322                  07/27/20   10/27/20    FREY & CAMPBELL, INC.               
                                                            TC-001           -676                  10/13/20   12/21/20    SENSORY TECHNOLOGIES, LLC           
                                                            TC-002         -7,659                  10/13/20   12/21/20    SENSORY TECHNOLOGIES, LLC           
                                                            TC-003         -5,000                  01/10/22   11/08/22    Sensory Tech LLC                    
 
18-0176   Reconstruction               0-005-014  03/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CONT-001          888                  07/16/20   08/31/20    DAU AUTOMATION                      
                                                            EC-001        -10,123                  03/27/20   07/03/20    DIEKOW ELECTRIC, INC.               
                                                            FS-001         -4,527                  08/24/20   11/05/20    MAIN FORD GENERAL SUPPLY            
                                                            FS-002           -208                  08/24/20   11/05/20    MAIN FORD GENERAL SUPPLY            
                                                            FS-003           -803                  08/24/20   11/05/20    MAIN FORD GENERAL SUPPLY            
                                                            FS-004          2,986                  08/24/20   11/05/20    MAIN FORD GENERAL SUPPLY            
                                                            GC-002          2,333                  10/11/19   12/16/19    FAHS CONSTRUCTION GROUP             
                                                            GC-003          4,336                  11/07/19   12/10/19    FAHS CONSTRUCTION GROUP             
                                                            GC-004          3,362                  11/27/19   12/10/19    FAHS CONSTRUCTION GROUP             
                                                            GC-005          9,651                  11/27/19   12/10/19    FAHS CONSTRUCTION GROUP             
                                                            GC-006          6,626                  11/27/19   12/10/19    FAHS CONSTRUCTION GROUP             
                                                            GC-007         12,011                  12/20/19   02/13/20    FAHS CONSTRUCTION GROUP             
                                                            GC-009        -10,872                  07/16/20   09/24/20    FAHS CONSTRUCTION GROUP             
                                                            HC-001         -4,336                  11/22/19   12/09/19    KIMBLE, INC.                        
                                                            PC-001          5,284                  08/28/20   11/05/20    KIMBLE, INC.                        
                                                            PC-002          2,754                  08/28/20   11/05/20    KIMBLE, INC.                        
                                                            PC-003          2,881                  09/09/20   11/12/20    KIMBLE, INC.                        
 
01-0279SC Visual Structural Inspection 0-005-SC1  09/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Bldg (houses generators):
07-1108   Reconstruction               3-004-001  05/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           9,139                  10/09/09   11/06/09    FAHS CONSTRUCTION                   
                                                            GC-05           8,812                  10/19/09   01/07/10    FAHS CONSTRUCTION                   
                                                            GC-08           3,973                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
 

          Bus Garage:
96-0974   Reconstruction               5-002-002  04/18/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3             5,152                  12/06/02   12/09/02    Nelson Elec.                        
                                                            E-4             1,248                  12/06/02   12/09/02    Nelson Elec.                        
                                                            G1-7           -2,860                  12/06/02   12/09/02    Welliver McGuire                    
 
99-0734   Reconstruction               5-002-003  04/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-6            1,320                  11/12/02   01/02/03    SA Hovanec                          
 
13-0360   Reconstruction               5-002-004  04/23/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-05               0                  03/05/15   03/25/15    Streeter Associates, Inc.           
 
15-1526   Reconstruction               5-002-005  05/18/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0176   Reconstruction               5-002-006  08/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GCBL-001      -12,050                  07/11/17   07/14/17    Filtrec Corporation                 
                                                            GCBL-001          151                  01/22/18   02/05/18    Filtrec Corporation                 
 

          Press Box:
00-0454   New Construction             7-008-001  12/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Field House:
07-1109   New Construction             7-009-001  05/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-17           9,377                  05/10/11   06/10/11    FAHS CONSTRUCTION                   
 

          District-Wide:
17-0311   Reconstruction               7-999-001  10/26/17  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0589   Reconstruction               7-999-002  10/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

TRUMANSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-10-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Russell I Doig Middle School:
99-0796   Additions and Alterations    0-001-006  05/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CW-3            2,015                  05/24/02   06/04/02    Northeast Interior Systems          
                                                            CW-4            2,712                  07/16/02   07/24/02    Northeast Interior Systems          
                                                            EC-2           16,500                  03/18/02   04/19/02    Richardson Bros. Elec.              
                                                            EC-3            5,500                  03/28/02   05/07/02    Richardson Bros. Elec.              
                                                            FC-3            5,624                  11/04/02   12/10/02    D&R Jones Const.                    
                                                            FC-5            2,473                  07/02/03   07/07/03    D&R Jones Const.                    
                                                            FS-2            1,481                  07/16/02   07/24/02    B&W Supply                          
                                                            GC-11           9,872                  04/16/02   05/10/02    Bette & Cring                       
                                                            GC-12           3,379                  06/24/02   07/12/02    Bette & Cring                       
                                                            GC-18           6,776                  11/29/02   01/03/03    Bette & Cring                       
                                                            GC-22         -13,160                  12/31/02   01/10/03    Bette & Cring                       
                                                            GC-24          12,448                  01/28/03   02/11/03    Bette & Cring                       
                                                            GC-25           6,528                  01/20/03   02/10/03    Bette & Cring                       
                                                            GC-29           4,305                  04/01/03   04/03/03    Bette & Cring                       
                                                            GC-30           7,720                  04/10/03   04/21/03    Bette & Cring                       
                                                            GC-34           5,712                  07/14/03   07/23/03    Bette & Cring                       
                                                            GC-6            4,541                  03/04/02   04/18/02    Bette & Cring                       
                                                            GC-7            8,163                  03/28/02   05/07/02    Bette & Cring                       
                                                            HVAC-2          3,615                  06/24/02   07/12/02    Louis N. Picciano and Son, Inc      
                                                            HVAC-3           -764                  12/15/03   01/14/04    Louis Picciano                      
                                                            MC-5           -1,170                  11/12/02   12/23/02    Casler Masonry                      
                                                            PLC-4           1,137                  07/02/03   07/07/03    HMI Mech.                           
                                                            PV-3            4,643                  04/01/03   04/03/03    Seneca Pipe & Paving Company        
                                                            SW-3            7,988                  03/18/02   04/19/02    Hakes Const.                        
                                                            SW-4           11,098                  03/28/02   05/07/02    Hakes Const.                        
 
13-0040   Reconstruction               0-001-009  12/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-01           -3,000                  08/27/14   10/06/14    Metro Contracting & Environmental   
                                                            A-02           -2,598                  10/24/14   10/31/14    Metro Contracting & Environmental   
                                                            GC-03               0                  07/07/14   11/06/14    Streeter Associates                 
                                                            GC-04               0                  08/14/14   09/19/14    Streeter Associates                 
                                                            GC-06               0                  11/10/14   11/17/14    Streeter Associates                 
                                                            GC-07           4,730                  11/10/14   11/17/14    Streeter Associates                 
                                                            GC-08           9,584                  11/10/14   11/17/14    Streeter Associates                 
                                                            GC-09          32,160                  11/10/14   11/17/14    Streeter Associates                 
                                                            GC-10             412                  11/10/14   11/17/14    Streeter Associates                 
                                                            GC-11           4,788                  11/24/14   02/06/15    Streeter Associates                 
                                                            GC-12           3,060                  11/24/14   02/06/15    Streeter Associates                 
                                                            GC-14           2,194                  11/24/14   02/06/15    Streeter Associates                 
                                                            M-02            3,797                  11/24/14   07/07/15    HMI Mechinical Systems, Inc.        
                                                            M-03            1,139                  11/24/14   07/07/15    HMI Mechanical Systems, Inc.        
                                                            M-04            1,959                  11/24/14   02/06/15    HMI Mechanical Systems, Inc.        
                                                            M-05              182                  12/03/14   12/15/14    HMI Mechanical Systems, Inc.        
                                                            P-01                0                  10/06/14   10/08/14    John Y. Cook, Jr., Painting         
                                                            P-02            1,101                  10/06/14   10/08/14    John J. Cook, Jr., Painting         
                                                            P-03            7,855                  10/20/14   10/22/14    John H. Cook, Jr., Painting Contract
                                                            P-04            2,335                  10/20/14   10/22/14    John H. Cook, Jr., Painting Contract
                                                            SP-01               0                  05/27/14   06/27/14    Smith Site Development, LLC         
                                                            WC-01               0                  12/08/14   12/15/14    Window Specialist, Inc.             
                                                            WC-02               0                  12/08/14   12/15/14    Window Specialist, Inc.             
                                                            WC-03          29,498                  01/22/15   01/29/15    Window Specialist, Inc.             
                                                            eC-01               0                  05/07/14   05/21/14    Streeter Associates                 
 
07-0019   Reconstruction               0-001-010  08/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,000                  01/25/08   08/06/08    HERITAGE MASONRY RESTORATION        
 
08-0107   Reconstruction               0-001-011  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            11,028                  08/20/09   09/09/09    HMI MECHANICAL SYSTEMS INC          
                                                            001            19,590                  08/20/09   09/09/09    AB CONSTRUCTION & ROOFING INC       
                                                            011            22,541                  06/23/11   07/01/11    MCPHERSON BUILDERS INC              
                                                            016               774                  01/23/12   04/13/12    MCPHERSON BUILDERS INC              
                                                            E-004               0                  10/26/09   11/20/09    JOHN MILLS ELECTRICAL INC           
                                                            E-011           1,056                  12/09/09   01/21/10    JOHN MILLS ELECTRICAL INC           
                                                            E-014          18,540                  01/11/10   02/25/10    JOHN MILLS ELECTRICAL INC           
                                                            E-017           2,000                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-020           1,782                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-027             423                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-030           3,011                  04/16/10   06/24/10    JOHN MILLS ELECTRICAL INC           
                                                            E-040             326                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            GC-005         11,516                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-011              0                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-017              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            GC-022              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            GC-024           -211                  04/21/10   07/27/10    MASSA CONSTRUCTION INC              
                                                            GC-025          3,939                  05/13/10   07/21/10    MASSA CONSTRUCTION INC              
                                                            GC-040              0                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-050          9,028                  03/14/11   06/09/11    MASSA CONSTRUCTION INC              
                                                            GC-051          3,641                  03/14/11   06/09/11    MASSA CONSTRUCTION INC              
                                                            GC-055          4,548                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-057          4,870                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-058         -7,253                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-060          2,774                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            M-003               0                  01/11/10   02/25/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-005               0                  02/25/10   05/13/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-008             618                  03/08/10   05/25/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-009            -578                  09/28/10   11/01/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-010            -211                  09/28/10   11/01/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-011            -892                  09/28/10   11/01/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-013            -326                  09/28/10   11/01/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-23B          -2,252                  03/31/11   04/21/11    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            P-001           7,695                  09/30/09   11/19/09    HMI MECHANICAL SYSTEMS INC          
                                                            R-002           4,210                  09/02/09   11/06/09    AB CONSTRUCTION & ROOFING INC       
                                                            R-006               0                  07/28/10     /  /      AB CONSTRUCTION & ROOFING INC       
                                                            R-009          -3,098                  11/19/10   11/23/10    AB CONSTRUCTION & ROOFING INC       
                                                            SC-005              0                  06/08/10   08/04/10    W.D. SMITH & SONS INC               
                                                            SC-013          9,980                  09/28/10   11/01/10    W.D. SMITH & SONS INC               
                                                            SC-014         17,928                  09/28/10   11/01/10    W.D. SMITH & SONS INC               
                                                            SC-023          7,936                  10/01/10   10/29/10    W.D. SMITH & SONS INC               
                                                            SC-025          5,080                  10/08/10   10/25/10    W.D. SMITH & SONS INC               
                                                            SC-028            779                  10/08/10   10/25/10    W.D. SMITH & SONS INC               
                                                            SC-032         48,439                  11/03/10   11/12/10    W.D. SMITH & SONS INC               
                                                            SC-034         18,976                  11/03/10   11/12/10    W.D. SMITH & SONS INC               
                                                            SC-039         -5,611                  06/23/11   09/09/11    W.D. SMITH & SONS INC               
                                                            SC-041        -10,000                  08/04/11   09/07/11    WD SMITH & SONS INC                 
 
10-0615   Reconstruction               0-001-012  03/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0564   Reconstruction               0-001-013  04/05/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1732   Reconstruction               0-001-014  08/04/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0258   Reconstruction               0-001-015  09/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0056   Reconstruction               0-001-016  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-001         28,475                  08/10/20   09/17/20    ABSCOPE ENVIROMENTAL, INC.          
                                                            AC-002          2,243                  08/10/20   09/17/20    ABSCOPE ENVIROMENTAL, INC.          
                                                            BC-001          2,253                  02/10/21   04/08/21    DAY AUTOMATION                      
                                                            BC-002          2,576                  03/31/21   05/12/21    DAY AUTOMATION                      
                                                            BC-003          3,474                  03/31/21   05/12/21    DAY AUTOMATION                      
                                                            BC-005         15,617                  07/01/21   03/16/22    Day Automation                      
                                                            BC-009         32,928                  07/01/21   03/16/22    Day Automation                      
                                                            BC-010         10,984                  12/03/21   09/20/22    Day Automation                      
                                                            BC-012         23,662                  11/25/22   09/19/23    DAY AUTOMATION                      
                                                            BC-013         13,476                  11/25/22   09/19/23    DAY AUTOMATION                      
                                                            EC-001         26,305                  08/10/20   09/17/20    JOHN MILLS ELECTRIC, INC.           
                                                            EC-003        200,755                  01/13/21   04/21/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-007          9,774                  03/22/21   05/20/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-012          4,305                  05/14/21   08/27/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-014         10,114                  05/14/21     /  /      JOHN MILLS ELECTRIC, INC.           
                                                            EC-017          3,849                  07/01/21   03/16/22    John Mills Electric Inc             
                                                            EC-018         11,386                  09/07/21   05/24/22    JOHN MILLS ELECTRIC, INC            
                                                            EC-019          1,618                  09/07/21   05/24/22    JOHN MILLS ELECTRIC, INC            
                                                            EC-022            848                  09/07/21   05/24/22    JOHN MILLS ELECTRIC, INC            
                                                            EC-024         10,369                  10/12/21   11/18/22    John Mills Electric, Inc            
                                                            EC-027         11,769                  10/12/21   11/18/22    John Mills Electric, Inc            
                                                            EC-029         14,722                  10/12/21   11/18/22    John Mills Electric, Inc            
                                                            EC-032         10,692                  11/08/21   12/12/22    John Mills Electric, Inc            
                                                            EC-035         11,031                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-044         24,405                  01/21/22   11/17/22    John Mills Elec                     
                                                            EC-045          9,399                  02/22/22   12/16/22    JOHN MILLS ELECTRIC, INC            
                                                            EC-048          7,768                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            EC-050          2,098                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            EC-054          4,762                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            GA-002            800                  05/09/22   05/04/23    Presentation Concepts Corp          
                                                            GA-03            -532                  06/06/22   05/01/23    Prest Concepts Corp                 
                                                            GC-004         21,791                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-005         10,719                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-007         19,856                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-008          9,211                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-011          7,461                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-013          5,363                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-017          5,988                  01/13/21   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-019         26,365                  01/13/21   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-020            542                  01/22/21   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-021          5,664                  01/29/21   04/28/21    FAHS CONSTRUCTION GROUP, LLC        
                                                            GC-022         12,013                  01/29/21   04/28/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-024         10,328                  01/29/21   04/28/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-025          7,249                  01/29/21   04/28/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-029          3,204                  03/22/21   05/06/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-030          2,243                  03/22/21   05/06/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-031          4,523                  03/26/21   05/05/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-035          6,340                  04/28/21   03/16/22    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-036         19,320                  03/31/21   05/05/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-037         11,589                  04/21/21   03/16/22    FAHS CONSTRUCTION GROUP             
                                                            GC-040          2,536                  04/23/21   03/16/22    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-042         22,479                  05/14/21   05/24/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-044         17,999                  05/26/21   04/07/22    Fahs Construction Group             
                                                            GC-045         -3,725                  05/26/21   04/07/22    Fahs Construction Group             
                                                            GC-049         12,188                  07/01/21   12/21/21    Fahs Construction Group Inc         
                                                            GC-055          2,739                  09/07/21     /  /      FAHS CONSTRUCTION GROUP, INC        
                                                            GC-058          8,135                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-059         14,904                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-061         16,663                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-063          3,252                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-066          5,105                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-071          2,043                  11/08/21   12/07/22    Fahs Const Group, Inc               
                                                            HC-001         -6,605                  07/22/20   09/11/20    KIMBLE, INC.                        
                                                            HC-004          2,264                  10/12/21   11/18/22    Kimble, Inc                         
                                                            HC-006          1,683                  10/12/21   11/18/22    Kimble, Inc                         
                                                            HC-008          1,617                  01/21/22   11/17/22    Kimble Inc                          
                                                            HC-009          4,232                  01/21/22   11/17/22    Kimble Inc                          
                                                            HC-015            735                  02/22/22   12/16/22    KIMBLE, INC                         
                                                            PC-001           -243                  08/10/20   09/17/20    FREY & CAMPBELL, INC.               
                                                            PC-005          2,940                  03/31/21   05/12/21    FREY & CAMPBELL, INC.               
                                                            PC-006          8,559                  04/21/21   08/04/21    FREY & CAMPBELL, INC.               
                                                            PC-013          2,290                  02/22/22   12/20/22    FREY & CAMPBELL, INC.               
                                                            PC-015          3,627                  08/31/22   04/20/23    Frey & Campbell Inc                 
                                                            RC-003          7,441                  02/22/22   02/21/23    HALE CONTACTING, INC                
                                                            RC-004          7,072                  02/22/22   02/21/23    HALE CONTRACTING, INC.              
                                                            RC-005            238                  03/31/22     /  /      Hale Contr Inc                      
                                                            RC-005            238                  03/31/22   03/06/23    HALE CONTRACTING                    
                                                            SC-001         10,412                  11/08/21   12/12/22    Boland Excavating&Topsoil, Inc      
                                                            SC-004          6,228                  11/08/21   12/12/22    Boland's Excavating & Topsoil, Inc  
 

          Trumansburg Elementary:
94-1462   Reconstruction               0-003-004  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0795   Additions and Alterations    0-003-005  05/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1           10,058                  12/31/02   01/10/03    USA Remediation Services            
                                                            CW-2            6,936                  12/24/01   03/08/02    Northeast Interior Systems          
                                                            EC-10           3,098                  04/10/03   04/21/03    Richardson Bros. Elec.              
                                                            EC-4            4,128                  04/01/02   05/07/02    Richardson Bros. Elec.              
                                                            EC-7           -5,500                  12/31/02   01/10/03    Richardson Bros. Elec.              
                                                            FC-6            7,509                  07/02/03   07/07/03    D&R Jones Const.                    
                                                            GC-10           8,461                  04/10/02   04/25/02    Bette & Cring                       
                                                            GC-13           7,881                  08/29/02   09/05/02    Bette & Cring                       
                                                            GC-14           5,702                  08/29/02   09/05/02    Bette & Cring                       
                                                            GC-15           6,473                  08/29/02   09/05/02    Bette & Cring                       
                                                            GC-2           11,329                  02/22/02   04/01/02    Bette & Cring                       
                                                            GC-20           6,758                  12/06/02   01/06/03    Bette & Cring                       
                                                            GC-23          -5,664                  12/31/02   01/10/03    Bette & Cring                       
                                                            GC-28           8,066                  03/19/03   03/28/03    Bette & Cring                       
                                                            GC-3           12,518                  02/04/02   03/25/02    Bette & Cring                       
                                                            GC-35             261                  07/14/03   07/23/03    Bette & Cring                       
                                                            GC-4            6,020                  02/19/02   04/01/02    Bette & Cring                       
                                                            GC-5            6,443                  02/26/02   04/18/02    Bette & Cring                       
                                                            GC-8            7,786                  04/01/02   05/07/02    Bette & Cring                       
                                                            GC-9           10,107                  04/10/02   04/25/02    Bette & Cring                       
                                                            HVAC-4          5,063                  01/02/04   01/05/04    Louis Picciano & Son                
                                                            MC-2           10,726                  12/11/01   03/08/02    Casler Masonry                      
                                                            MC-3           -2,082                  11/12/02   12/23/02    Casler Masonry                      
                                                            PLC-5           8,267                  07/02/03   07/07/03    HMI Mech.                           
                                                            PV-2            2,440                  03/19/03   03/28/03    Seneca Pipe & Paving                
                                                            PV-7            6,653                  06/03/03   06/12/03    Seneca Pipe & Paving                
                                                            RC-2              -70                  09/30/02   11/01/02    J&B Installations                   
                                                            RC-3            2,404                  12/31/02   01/10/03    J&B Installations                   
                                                            WC-2            1,767                  03/19/03   03/28/03    The Glass Company                   
 
05-0836   Reconstruction               0-003-007  03/10/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0108   Reconstruction               0-003-008  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003           -21,199                  01/18/11   02/17/11    McPHERSON BUILDERS INC              
                                                            004             4,262                  05/19/11   06/09/11    MCPHERSON BUILDERS INC              
                                                            005             5,948                  05/02/11   05/25/11    MCPHERSON BUILDERS INC              
                                                            006             4,262                  05/02/11   05/25/11    MCPHERSON BUILDERS INC              
                                                            007            27,600                  05/02/11   05/25/11    MCPHERSON BUILDERS INC              
                                                            009            -1,627                  05/19/11   06/09/11    MCPHERSON BUILDERS INC              
                                                            010             1,306                  06/17/11   07/01/11    MCPHERSON BUILDERS INC              
                                                            012             1,876                  06/23/11   07/01/11    MCPHERSON BUILDERS INC              
                                                            013             8,140                  08/04/11   09/07/11    MCPHERSON BUILDERS INC              
                                                            014            17,158                  08/19/11   09/07/11    MCPHERSON BUILDERS INC              
                                                            015             4,775                  08/26/11   09/20/11    MCPHERSON BUILDERS INC              
                                                            E-005               0                  10/26/09   11/19/09    JOHN MILLS ELECTRICAL INC           
                                                            E-008           3,206                  12/09/09   01/21/10    JOHN MILLS ELECTRICAL INC           
                                                            E-010           2,113                  12/09/09   01/21/10    JOHN MILLS ELECTRICAL INC           
                                                            E-015             761                  02/25/10   05/13/10    JOHN MILLS ELECTRICAL INC           
                                                            E-016           7,318                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-019           1,782                  03/19/10   04/30/10    JOHN MILLS ELECTRIC INC             
                                                            E-032           3,243                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-033           4,153                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-034           5,719                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-035           3,325                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-042           2,202                  10/14/10   10/22/10    JOHN MILLS ELECTRICAL INC           
                                                            E-043           1,236                  10/14/10   10/22/10    JOHN MILLS ELECTRICAL INC           
                                                            E-044           2,477                  10/14/10   10/22/10    JOHN MILLS ELECTRICAL INC           
                                                            E-045           3,525                  10/14/10   10/22/10    JOHN MILLS ELECTRICAL INC           
                                                            E-046           3,264                  10/14/10   10/22/10    JOHN MILLS ELECTRICAL INC           
                                                            E-048             685                  11/19/10   11/23/10    JOHN MILLS ELECTRICAL INC           
                                                            GC-003              0                  01/25/10   03/05/10    MASSA CONSTRUCTION INC              
                                                            GC-004         -1,200                  03/19/10   04/30/10    MASSA CONSTRUCTION INC              
                                                            GC-007           -761                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-008           -395                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-010         39,601                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-013              0                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-015              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            GC-026        -39,601                  05/13/10   07/21/10    MASSA CONSTRUCTION INC              
                                                            GC-028              0                  07/28/10   09/07/10    MASSA CONSTRUCTION INC              
                                                            GC-031              0                  09/28/10   11/01/10    MASSA CONSTRUCTION INC              
                                                            GC-032              0                  01/31/11   03/03/11    MASSA CONSTRUCTION INC              
                                                            GC-033              0                  01/31/11   03/03/11    MASSA CONSTRUCTION INC              
                                                            GC-034              0                  01/31/11   03/03/11    MASSA CONSTRUCTION INC              
                                                            GC-035              0                  01/31/11   03/03/11    MASSA CONSTRUCTION INC              
                                                            GC-036              0                  01/31/11   03/03/11    MASSA CONSTRUCTION INC              
                                                            GC-037              0                  01/31/11   03/03/11    MASSA CONSTRUCTION INC              
                                                            GC-038              0                  01/31/11   03/03/11    MASSA CONSTRUCTION INC              
                                                            GC-039              0                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-043         -5,007                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-044              3                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-046          1,417                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-053            698                  03/14/11   06/24/11    MASSA CONSTRUCTION INC              
                                                            GC-054          1,852                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-056            700                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-062          6,098                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-063            733                  05/02/11   05/23/11    MASSA CONST INC                     
                                                            GC-064A        -5,000                  05/06/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-48           6,336                  02/23/11   03/18/11    MASSA CONSTRUCTION INC              
                                                            GC-49           5,221                  02/23/11   03/18/11    MASSA CONSTRUCTION INC              
                                                            M-014           2,593                  09/28/10   11/01/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-017           3,224                  11/03/10   11/12/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-020          10,292                  01/24/11   03/18/11    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-021          -4,911                  01/24/11   03/18/11    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-022           1,704                  01/13/11   02/07/11    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-23A            -575                  03/31/11   04/21/11    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            R-004           1,034                  05/14/10   07/27/10    AB CONSTRUCTION & ROOFING           
                                                            R-005               0                  07/28/10     /  /      AB CONSTRUCTION & ROOFING INC       
                                                            SC-003              0                  05/27/10   08/04/10    W.D. SMITH & SONS INC               
                                                            SC-007         29,651                  08/30/10   09/24/10    W.D. SMITH & SONS INC               
                                                            SC-008         11,219                  08/09/10   09/07/10    W.D. SMITH & SONS INC               
                                                            SC-009          5,904                  08/09/10   09/28/10    W.D. SMITH & SONS INC               
                                                            SC-010         16,226                  09/28/10   11/01/10    WD SMITH & SONS INC                 
                                                            SC-011         14,674                  09/28/10   11/01/10    WD SMITH & SONS INC                 
                                                            SC-012         13,951                  09/28/10   11/01/10    WD SMITH & SONS INC                 
                                                            SC-017          3,058                  09/28/10   11/01/10    WD SMITH & SONS INC                 
                                                            SC-018         16,975                  09/28/10   11/01/10    WD SMITH & SONS INC                 
                                                            SC-019         19,218                  09/28/10   11/01/10    WD SMITH & SONS INC                 
                                                            SC-020         10,682                  09/28/10   11/01/10    WD SMITH & SONS INC                 
                                                            SC-021         21,137                  10/14/10   10/22/10    W.D. SMITH & SONS INC               
                                                            SC-022         10,889                  10/01/10   10/29/10    WD SMITH & SONS INC                 
                                                            SC-024          9,347                  10/08/10   10/25/10    W.D. SMITH & SONS INC               
                                                            SC-027          3,787                  10/08/10   10/25/10    WD SMITH & SONS INC                 
                                                            SC-031         12,118                  11/03/10   11/12/10    WD SMITH & SONS INC                 
                                                            SC-036          2,032                  11/03/10   11/12/10    W.D. SMITH & SONS INC               
 
13-0041   Reconstruction               0-003-009  12/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-06               0                  06/16/14   07/10/14    Richardson Brothers Electrical      
                                                            GC-015          1,538                  12/08/14   12/15/14    Streeter Associates                 
                                                            PLG-02          1,030                  10/06/14   10/08/14    Kimble, Incorporated                
                                                            S-01                0                  07/07/14   11/06/14    Davis Wallbridge, Inc.              
                                                            S-02                0                  08/14/14   09/19/14    Davis Wallbridge, Inc.              
                                                            S-03                0                  08/14/14   09/19/14    Davis Wallbridge, Inc.              
                                                            S-04                0                  09/22/14   09/29/14    Davis Wallbridge, Inc.              
                                                            S-07            2,378                  10/20/14   10/22/14    Davis Wallbridge, Inc.              
                                                            S-08            1,892                  10/20/14   10/22/14    Davis Wallbridge, Inc.              
                                                            S-10            4,488                  10/24/14   10/31/14    Davis Wallbridge, Inc.              
                                                            S-11           -1,523                  12/11/14   12/22/14    Davis Wallbridge, Inc.              
                                                            s-05                0                  10/20/14   10/22/14    Davis Wallbridge, Inc.              
                                                            s-06                0                  10/20/14   10/22/14    Davis Wallbridge, Inc.              
 
11-0563   Reconstruction               0-003-010  04/05/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            008             8,634                  10/04/12   02/25/13    STREETER ASSOCIATES                 
                                                            EC-001            685                  10/01/12   07/26/13    RICHARDSON BROTHERS ELECTRICAL CONT 
                                                            EC-004              0                  10/01/12   08/12/13    RICHARDSON BROTHERS ELECTRICAL CONT 
                                                            GC-001          7,689                  10/01/12   02/25/13    STREETER ASSOCIATES                 
                                                            GC-004          4,852                  10/01/12   02/25/13    STREETER ASSOCIATES                 
                                                            GC-006            972                  10/01/12   02/25/13    STREETER ASSOCIATES                 
                                                            GC-007             67                  10/01/12   02/25/13    STREETER ASSOCIATES                 
                                                            GC-009            381                  12/13/12   04/15/13    STREETER ASSOCIATES                 
                                                            GC-010          2,575                  12/13/12   04/15/13    STREETER ASSOCIATES                 
                                                            GC-011            821                  12/21/12   04/15/13    STREETER ASSOCIATES                 
                                                            GC-013            607                  01/24/13   08/27/13    STREETER ASSOCIATES                 
                                                            GC-02             983                  10/01/12   02/25/13    STREETER ASSOCIATES                 
                                                            GC-12             656                  01/24/13   08/27/13    STREETER ASSOCIATES                 
                                                            MC-001            528                  10/01/12   07/26/13    CLIMATE CONTROL TECHNOLOGIES INC    
                                                            MC-002            110                  10/01/12   07/26/13    CLIMATE CONTROL TECHNOLOGIES INC    
                                                            MC-003            835                  10/01/12   07/26/13    CLIMATE CONTROL TECHNOLOGIES INC    
 
12-1104   Reconstruction               0-003-011  05/09/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            ES E-01             0                  10/23/13   11/18/13    Schuler-Haas Electric Corp.         
                                                            ES E-02             0                  10/23/13   11/18/13    Schuler-Haas Electric Corp.         
                                                            ES E-03             0                  10/23/13     /  /      Schuler-Haas Electric Corp.         
                                                            ES R-01           148                  09/03/13   09/20/13    DeWald Roofing Co., Inc.            
                                                            ES RC-02            0                  09/19/13   10/24/13    DeWald Roofing Co. Inc.             
                                                            ES RC-03            0                  09/23/13   10/24/13    DeWald Roofing Co. Inc.             
                                                            ES RC-04            0                  09/23/13   10/24/13    DeWald Roofing Co., Inc.            
                                                            ES RC-05            0                  09/23/13   10/24/13    DeWald Roofing Co., Inc.            
                                                            ES RC-06            0                  09/23/13   10/24/13    DeWald Roofing Co., Inc.            
                                                            ES RC-07            0                  09/23/13   10/24/13    DeWald Roofing Co., Inc.            
                                                            ES RC-08            0                  09/23/13   10/24/13    DeWald Roofing Co., Inc.            
                                                            ES RC-09      -22,430                  09/23/13   10/24/13    DeWald Roofing Co., Inc.            
                                                            ES RC-10      -34,867                  09/23/13   10/24/13    DeWald Roofing Co., Inc.            
                                                            ES-E-04         2,856                  10/25/13   11/18/13    SCHULER-HAAS ELECTRIC CORP          
                                                            ES-MC-01            0                  10/23/13   11/18/13    Piccirilli-Slavik & Vincent Plumbing
                                                            ES-MC-01          621                  10/23/13     /  /      Piccirlli-Slavik & Vincent Plumbing 
                                                            ES-MC-02            0                  10/23/13   11/18/13    Piccirilli-Slavik & Vincent, Plumbin
                                                            ES-MC-03       -3,790                  10/25/13   11/18/13    PICCIRILLI-SLAVIK & VINCENT INC     
                                                            ES-MC-04        1,142                  12/09/13   01/10/14    Piccirilli-Salvik & Vincent, Inc.   
                                                            ES-MC-05          875                  12/09/13   01/10/14    Picciilli-Slavik & Vincent, Inc.    
 
13-0489   Reconstruction               0-003-012  03/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0439   Reconstruction               0-003-013  04/28/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1733   Reconstruction               0-003-014  08/04/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0259   Reconstruction               0-003-015  09/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0057   Reconstruction               0-003-016  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-005          5,800                  12/03/21   12/21/22    Abscope Enviromental Inc            
                                                            BC-004          3,244                  07/01/21   03/16/22    Day Automation                      
                                                            BC-007         10,398                  07/01/21   03/16/22    Day Automation                      
                                                            BC-011          1,712                  12/03/21   09/20/22    Day Automation                      
                                                            EC-002        194,860                  01/13/21   03/16/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-005          1,851                  03/03/21   04/20/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-011          3,718                  04/07/21   05/05/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-021          1,242                  09/07/21   05/24/22    JOHN MILLS ELECTRIC, INC            
                                                            EC-025          7,573                  10/12/21   11/18/22    John Mills Electric, Inc            
                                                            EC-028          1,350                  10/12/21   11/18/22    John Mills Electric, Inc            
                                                            EC-033          5,421                  11/08/21   12/12/22    John Mills Electric, Inc            
                                                            EC-038          1,999                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-040         12,266                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-041          8,858                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-042          9,289                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-047          3,671                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            EC-052          1,975                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            GC-006          2,047                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-009          4,163                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-010          3,774                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-012          2,619                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-015         11,433                  01/13/21   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-016         16,584                  01/13/21   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-023          8,639                  01/29/21   04/28/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-026          9,468                  02/26/21   04/28/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-038         12,475                  04/23/21   03/16/22    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-041         16,808                  05/14/21   05/24/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-043         23,675                  05/26/21   04/07/22    Fahs Construction Group             
                                                            GC-046          8,901                  06/01/21   01/25/22    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-048          3,596                  07/01/21   12/21/21    Fahs Construction Group             
                                                            GC-052          2,542                  09/07/21   11/23/22    FAHS CONSTRUCTION GROUP, INC        
                                                            GC-053          4,174                  09/07/21   11/23/22    FAHS CONSTRUCTION GROUP, INC        
                                                            GC-055          2,739                  09/07/21   11/23/22    Fahs Construction Group, INC        
                                                            GC-056          5,117                  09/07/21   11/23/22    FAHS CONSTRUCTION GROUP, INC        
                                                            GC-062          4,571                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-068          3,472                  11/01/21   12/07/22    Fahs Const Group, Inc               
                                                            GC-070          9,636                  11/08/21   12/07/22    Fahs Const Group, Inc               
                                                            GC-079          4,534                  01/21/22   01/31/23    Fahs Const Group Inc                
                                                            GC-081         24,926                  01/21/22   02/01/23    Fahs Const Group Inc                
                                                            GC-083         11,734                  11/25/22   09/19/23    FAHS CONST GROUP INC                
                                                            GC-084          5,686                  11/25/22   09/19/23    FAHS CONST GROUP INC                
                                                            GC-085         10,522                  11/25/22   09/19/23    FAHS CONST GROUP INC                
                                                            HC-003          3,834                  09/07/21   11/23/22    KIMBLE                              
                                                            HC-005          6,156                  10/12/21   11/18/22    Kimble, Inc                         
                                                            HC-010          8,172                  01/21/22   11/17/22    Kimble Inc                          
                                                            HC-011          3,099                  01/21/22   11/15/22    Kimble Inc                          
                                                            HC-012          1,904                  01/21/22   11/15/22    Kimble Inc                          
                                                            HC-017          1,085                  05/09/22   03/13/23    Kimble Inc                          
                                                            HC-018            -50                  06/06/22   05/01/23    Kimble Inc                          
                                                            HC-019         15,638                  11/25/22   09/19/23    KIMBLE INC.                         
                                                            PC-008             85                  10/12/21   11/18/22    Frey & Campbell, Inc                
                                                            PC-010            839                  12/03/21   09/20/22    Frey& Campbell Inc                  
                                                            PC-012          2,290                  02/22/22   12/16/22    FREY & CAMPBELL, INC.               
                                                            SC-003            977                  11/08/21   12/12/22    Boland Excavating&Topsoil, Inc      
                                                            SC-005            663                  01/21/22   02/01/23    Boland Excating&Topsoil Inc         
 

          Dickerson High School:
94-1461   Reconstruction               0-006-003  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0797   Additions and Alterations    0-006-004  05/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CW-5              -81                  12/31/02   01/10/03    Northeast Interior Systems          
                                                            EC-5           -5,500                  12/31/02   01/10/03    Richardson Bros. Elec.              
                                                            EC-8            8,145                  03/19/03   03/28/03    Richardson Bros. Elec.              
                                                            EC-9            3,519                  04/01/03   04/03/03    Richardson Bros. Elec.              
                                                            FC-2            9,858                  02/27/03   03/18/03    D&R Jones Const.                    
                                                            FC-4            3,971                  06/03/03   06/12/03    D&R Jones Const.                    
                                                            FS-3            1,304                  01/28/03   02/11/03    B&W Supply                          
                                                            GC-16           6,985                  11/22/02   01/02/03    Bette & Cring                       
                                                            GC-17           7,620                  11/29/02   01/03/03    Bette & Cring                       
                                                            GC-19           4,875                  12/06/02   01/06/03    Bette & Cring                       
                                                            GC-21          -5,664                  12/31/02   01/10/03    Bette & Cring                       
                                                            GC-26           1,215                  01/08/03   02/11/03    Bette & Cring                       
                                                            GC-27           8,679                  01/28/03   02/11/03    Bette & Cring                       
                                                            GC-31           9,913                  04/10/03   04/21/03    Bette & Cring                       
                                                            GC-32           6,898                  07/02/03   08/05/03    Bette & Cring                       
                                                            GC-33           5,274                  07/14/03   07/23/03    Bette & Cring                       
                                                            HVAC-5         -7,874                  01/09/04   02/03/04    Louis Picciano and Sons             
                                                            MC-4             -968                  11/12/02   12/23/02    Casler Masonry                      
                                                            MC-6              -81                  12/31/02   01/10/03    Casler Masonry                      
                                                            PLC-3           6,051                  07/02/03   07/07/03    HMI Mech.                           
                                                            PV-4           15,890                  04/10/03   04/21/03    Seneca Pipe & Paving                
                                                            PV-5            7,904                  04/17/03   06/12/03    Seneca Pipe & Paving                
                                                            PV-6           13,920                  04/25/03   05/05/03    Seneca Pipe & Paving                
                                                            PV-9           17,903                  07/14/03   07/23/03    Seneca Pipe & Paving                
                                                            SW-5           -7,800                  10/18/02   03/11/03    Hakes Const.                        
                                                            SW-6           -6,014                  07/25/03   08/05/03    Hakes Const.                        
                                                            SW-7           -2,449                  05/24/04   07/09/04    Hakes Const.                        
                                                            WC-3              781                  04/01/03   04/03/03    The Glass Company                   
                                                            WC-4              527                  06/03/03   06/12/03    The Glass Company                   
 
99-0305   Reconstruction               0-006-005  01/04/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-6           -5,500                  12/21/02   01/10/03    Richardson Bros. Elec.              
                                                            FC-7           -2,640                  07/02/03   07/07/03    D&R Jones Const.                    
                                                            PV-8            4,103                  07/02/03   07/07/03    Seneca Piping And Paving            
 
03-0604   Reconstruction               0-006-007  12/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0109   Reconstruction               0-006-008  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            27,830                  12/31/10   01/28/11    MEERSON BUILDERS INC                
                                                            002             1,380                  12/31/10   01/28/11    MCPHERSON BUILDERS INC              
                                                            008                 0                  05/19/11   06/09/11    MCPHERSON BUILDERS INC              
                                                            017             1,454                  01/23/12   04/13/12    MCPHERSON BUILDERS INC              
                                                            E-001           8,290                  09/02/09   11/06/09    JOHN MILLS ELECTRICAL INC           
                                                            E-002          50,315                  09/16/09   10/09/09    JOHN MILLS ELECTRICAL INC           
                                                            E-003               0                  10/26/09   11/20/09    JOHN MILLS ELECTRICAL INC           
                                                            E-007          25,861                  10/26/09   11/19/09    JOHN MILLS ELECTRICAL INC           
                                                            E-009          12,830                  12/09/09   01/21/10    JOHN MILLS ELECTRICAL INC           
                                                            E-012           2,113                  12/09/09   01/21/10    JOHN MILLS ELECTRICAL INC           
                                                            E-018           2,000                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-021           1,782                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-023          18,637                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-024           4,357                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-025           9,049                  03/19/10   04/30/10    JOHN MILLS ELECTRICAL INC           
                                                            E-028           2,719                  03/29/10   05/11/10    JOHN MILLS ELECTRICAL INC           
                                                            E-029          10,333                  03/29/10   05/11/10    JOHN MILLS ELECTRICAL INC           
                                                            E-031           9,738                  06/30/10   08/11/10    JOHN MILLS ELECTRICAL INC           
                                                            E-036           3,787                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-037           2,815                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-038             575                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-047             453                  11/19/10   11/23/10    JOHN MILLS ELECTRICAL INC           
                                                            E-049           1,652                  11/19/10   11/23/10    JOHN MILLS ELECTRICAL INC           
                                                            GC-001         18,127                  12/23/09   02/05/10    MASSA CONSTRUCTION INC              
                                                            GC-002              0                  12/23/09   02/05/10    MASSA CONSTRUCTION INC              
                                                            GC-006          7,443                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-009         11,330                  03/29/10   06/09/11    MASSA CONSTRUCTION INC              
                                                            GC-012              0                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-014          7,019                  03/29/10   05/11/10    MASSA CONSTRUCTION INC              
                                                            GC-018              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            GC-019              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            GC-020              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            GC-021              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            GC-023           -525                  04/21/10   07/27/10    MASSA CONSTRUCTION INC              
                                                            GC-027              0                  07/19/10   09/29/10    MASSA CONSTRUCTION INC              
                                                            GC-029              0                  07/28/10   09/07/10    MASSA CONSTRUCTION INC              
                                                            GC-030           -575                  10/08/10   10/25/10    MASSA CONSTRUCTION INC              
                                                            GC-041              0                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-042           -500                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-045          1,172                  02/10/11   02/25/11    MASSA CONSTRUCTION INC              
                                                            GC-052           -350                  03/14/11   06/09/11    MASSA CONSTRUCTION INC              
                                                            GC-059          5,563                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-061         29,073                  05/02/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-064b        -5,000                  05/06/11   05/25/11    MASSA CONSTRUCTION INC              
                                                            GC-47             974                  02/23/11   03/18/11    MASSA CONSTRUCTION INC              
                                                            M-001               0                  01/11/10   02/25/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-002               0                  01/11/10   02/25/10    DANIEL D'AMICO PLUMBING & HEATING   
                                                            M-004               0                  02/25/10   05/13/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-006               0                  02/25/10   05/13/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-007             402                  03/08/10   05/25/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-012           4,334                  09/28/10   11/01/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-015           1,399                  09/23/10   11/12/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-016           1,570                  11/03/10   11/12/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-018           1,846                  11/03/10   11/12/10    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            M-019           1,032                  01/24/11   03/18/11    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            M-023C            747                  03/31/11   04/21/11    DANIEL J D'AMICO PLUMBING & HEATING 
                                                            P-002               0                  11/09/09   02/26/10    HMI MECHANICAL SYSTEMS INC          
                                                            P-005           8,353                  11/18/09   04/30/10    HMI MECHANICAL SYSTEMS INC          
                                                            P-006               0                  11/19/10     /  /      HMI MECHANICAL SYSTEMS INC          
                                                            P-007          -2,598                  11/03/10   11/12/10    HMI MECHANICAL SYSTEMS INC          
                                                            R-003               0                  11/02/09   01/12/10    AB CONSTRUCTION & ROOFING INC       
                                                            R-007               0                  09/13/10   09/24/10    AB CONSTRUCTION & ROOFING INC       
                                                            R-008               0                  11/19/10   11/23/10    AB CONSTRUCTION & ROOFING INC       
                                                            S-040          -4,000                  06/23/11   07/01/11    W.D. SMITH & SONS INC               
                                                            SC-004         17,650                  06/08/10   08/04/10    W.D. SMITH & SONS INC               
                                                            SC-006         29,450                  06/08/10   08/04/10    W.D. SMITH & SONS INC               
                                                            SC-009          5,904                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-010         16,226                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-011         14,674                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-012         13,951                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-016          4,358                  09/28/10   11/01/10    W.D. SMITH & SONS INC               
                                                            SC-029          1,867                  10/08/10   10/25/10    W.D. SMITH & SONS INC               
                                                            SC-033          3,622                  11/03/10   11/12/10    W.D. SMITH & SONS INC               
                                                            SC-037           -358                  11/08/10   11/12/10    W.D. SMITH & SONS INC               
 
13-0042   Reconstruction               0-006-009  12/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-01                0                  05/19/14   06/03/14    Richardson Brothers, Inc.           
                                                            EC-02               0                  05/19/14   06/03/14    Richardson Brothers, Inc.           
                                                            EC-03               0                  06/16/14   07/10/14    Richardson Brothers Electrical      
                                                            EC-04               0                  06/16/14   07/10/14    Richardson Brothers Electrical      
                                                            EC-05               0                  06/16/14   07/10/14    Richardson Brothers Electrical      
                                                            EC-07               0                  08/14/14   09/19/14    Richardson Brothers Electrical      
                                                            EC-08          26,672                  08/20/14   10/09/14    Richardson Brothers Electrical      
                                                            EC-10           1,229                  08/20/14   10/09/14    Richardson Brothers Electric        
                                                            EC-11           3,211                  08/27/14   10/06/14    Richardson Brothers Electrical      
                                                            EC-12           4,305                  09/05/14   09/29/14    Richardson Brotherrs Electrical     
                                                            EC-13           2,138                  09/05/14   09/29/14    Richardson Brothers Electrical      
                                                            EC-14             416                  10/20/14   10/22/14    Richardson Brothers Electrical      
                                                            EC-15           5,334                  10/20/14   10/22/14    Richardson Brothers Electrical      
                                                            EC-16           2,759                  11/10/14   11/17/14    Richardson Brothers Electrical      
                                                            Ec-09               0                  08/20/14   10/09/14    Richardson Brothers Electrical      
                                                            GC-02               0                  06/16/14   07/10/14    Streeter Associates                 
                                                            GC-05               0                  11/10/14   11/17/14    Streeter Associates                 
                                                            GC-13          12,238                  11/24/14   02/06/15    Streeter Associates                 
                                                            M-01                0                  11/24/14     /  /      HMI Mechanical Systems, Inc.        
                                                            P-05              727                  10/20/14   10/22/14    John H. Cook, Jr., Painting Contract
                                                            PLG-01              0                  10/06/14   10/08/14    Kimble, Incorporated                
                                                            S-09           32,540                  10/24/14   10/31/14    Davis Wallbridge, Inc.              
                                                            SP-01               0                  08/14/14     /  /      Smith Site Development, LLC         
                                                            SP-017          4,758                  12/22/14   01/21/15    Smith Site Developlment, LLC        
                                                            SP-02               0                  06/20/14   07/23/14    SMITH SITE DEVELOPMENT,LLC          
                                                            SP-03               0                  06/20/14   07/23/14    SMITH SITE DEVELOPMENT,LLC          
                                                            SP-04               0                    /  /       /  /                                          
                                                            SP-04               0                  07/07/14   11/06/14    Smith Site Development, LLC         
                                                            SP-06          10,013                  08/14/14   09/19/14    Smith Site Development, LLC         
                                                            SP-07               0                  08/14/14   09/19/14    Smith Site Development, LLC         
                                                            SP-08          32,000                  08/14/14   09/19/14    Smith Site Development, LLC         
                                                            SP-09               0                  08/27/14   10/06/14    Smith Site Development, LLC         
                                                            SP-10               0                  10/20/14   10/22/14    Smith Site Development, LLC         
                                                            SP-11               0                  10/21/14   10/24/14    Smith Site Development, LLC         
                                                            SP-12               0                  11/10/14   11/17/14    Smith Site Development, LLC         
                                                            SP-13               0                  10/21/14   10/24/14    Smith Site Development, LLC         
                                                            SP-14               0                  10/21/14   10/24/14    Smith Site Developmental, LLC       
                                                            SP-15               0                  10/21/14   10/24/14    Smith Site Development, LLC         
                                                            SP-16           1,113                  10/21/14   10/24/14    Smith Site Development, LLC         
                                                            p-06            1,250                  10/20/14   10/22/14    John H. Cook, Jr., Painting Contract
                                                            sp-05               0                  08/14/14   09/19/14    smith site development              
 
11-0565   Reconstruction               0-006-010  04/05/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002            305                  10/01/12   07/26/13    RICHARDSON BROTHERS ELECTRICAL CONT 
                                                            EC-003            250                  10/01/12   07/26/13    RICHARDSON BROTHERS ELECTRICAL CONT 
                                                            EC-005            502                  10/01/12   08/12/13    RICHARDSON BROTHERS ELECT CONT INC  
                                                            GC-003          3,441                  10/01/12   02/25/13    STREETER ASSOCIATES                 
                                                            GC-005            449                  10/01/12   02/25/13    STREETER ASSOCIATES                 
                                                            MC-04           2,968                  01/24/13   07/26/13    CLIMATE CONTROL TECHNOLOGIES INC    
                                                            MC-05             906                  01/24/13   07/26/13    CLIMATE CONTROL TECHNOLOGIES INC    
                                                            MC-06           1,684                  02/21/13     /  /      CLIMATE CONTROL TECHNOLOGIES INC    
 
11-1383   Reconstruction               0-006-011  03/19/13  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1105   Reconstruction               0-006-012  05/09/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            HS E-01             0                  10/23/13   11/18/13    Schuler-Haas Electric Corp.         
                                                            HS E-02             0                  10/15/13   11/18/13    SCHULER-HAAS ELECTRIC CORP          
                                                            HS E-03             0                  10/15/13   11/18/13    SCHULER-HAAS ELECTRIC CORP          
                                                            HS E-04        -2,550                  10/25/13   11/18/13    SCHULER-HAAS ELECTRIC CORP          
                                                            HS MC-01       10,875                  09/13/13   09/20/13    Piccirlli Slavik Vincent Plumbing & 
                                                            HS RC-01            0                  09/19/13   10/24/13    J&B INSTALLATIONS                   
                                                            HS RC-02            0                  09/23/13   10/24/13    J&B INSTALLATIONS                   
                                                            HS-MC-02            0                  10/23/13   11/18/13    Piccirilli-Slavik & Vincent, Plumbin
                                                            HS-MC-03            0                  10/23/13   11/18/13    Piccirilli-Slavik & Vincent, Plumbin
                                                            HS-MC-04          120                  10/25/13   11/18/13    PICCIRILLI-SLAVIK & VINCENT INC     
                                                            HS-R-03             0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-04            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-05            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-06            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-07            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-08            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-09            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-10            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-11            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-12            0                  11/07/13   11/22/13    J&B INSTALLATIONS INC               
                                                            HS-RC-13            0                  11/15/13   11/22/13    J & B Installations, Inc.           
                                                            HS-RC-14      -19,462                  11/15/13   11/22/13    J & B Installations, Inc.           
                                                            HS-RC-15      -42,620                  11/15/13   11/22/13    J & B Installations, Inc.           
 
14-1734   Reconstruction               0-006-013  08/04/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1735   Reconstruction               0-006-014  08/04/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0260   Reconstruction               0-006-015  09/18/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-001        -10,000                  10/02/19   12/16/19    J&B INSTALLATIONS, INC.             
 
19-0058   Reconstruction               0-006-017  10/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-004          4,622                  05/26/21   07/30/21    Abscope Enviromental Inc            
                                                            BC-006          2,434                  07/01/21   03/16/22    Day Automation                      
                                                            BC-008          5,179                  07/01/21   03/16/22    Day Automation                      
                                                            EC-004        344,385                  01/13/21   03/16/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-006          2,004                  03/03/21   04/20/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-008          2,393                  03/26/21   05/12/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-013          2,209                  05/14/21   08/16/21    JOHN MILLS ELECTRIC, INC.           
                                                            EC-015         15,971                  06/01/21   08/27/21    JOHN MILLS ELECTRIC                 
                                                            EC-016         18,800                  06/01/21   08/27/21    JOHN MILLS ELECTRIC                 
                                                            EC-020          4,061                  09/07/21   05/24/22    JOHN MILLS ELECTRIC, INC            
                                                            EC-023          3,884                  10/12/21     /  /      John Mills Electric, Inc            
                                                            EC-026         11,131                  10/12/21   11/18/22    John Mills Electric, Inc            
                                                            EC-030          4,565                  10/12/21   11/18/22    John Mills Electric, Inc            
                                                            EC-034          4,026                  11/08/21   12/12/22    John Mills Electric, Inc            
                                                            EC-036         23,236                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-037          5,669                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-043          2,247                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            EC-046          3,953                  02/22/22     /  /      JOHN MILLS ELECTRIC, INC.           
                                                            EC-049          1,962                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            EC-051         22,036                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            EC-053          1,476                  05/09/22   03/13/23    John Mills Elec Inc                 
                                                            EC-39           5,762                  01/21/22   11/17/22    John Mills Elec Inc                 
                                                            GA-001         17,053                  12/24/21   10/04/22    Presentation Concepts Corp          
                                                            GC-001         -6,701                  08/21/20   10/30/20    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-002          5,258                  12/30/20   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-003          2,820                  12/11/20   03/03/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-014          3,950                  01/13/21   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-018         20,129                  01/13/21   04/21/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-027          2,069                  02/26/21   04/28/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-028         12,941                  02/26/21   04/28/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-033          5,734                  03/31/21   05/05/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-034          6,196                  03/31/21   05/05/21    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-039          1,695                  04/23/21   03/16/22    FAHS CONSTRUCTION GROUP, INC.       
                                                            GC-047         29,356                  07/01/21   12/21/21    Fahs Construction Group             
                                                            GC-050          2,192                  07/01/21   12/21/21    Fahs Construction Group Inc         
                                                            GC-051          2,614                  09/07/21   11/23/22    FAHS CONSTRUCTION GROUP,INC         
                                                            GC-054          1,812                  09/07/21   11/23/22    FAHS CONSTRUCTION GROUP, INC        
                                                            GC-057         19,245                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-060         34,299                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-064          4,591                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-065          3,520                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-067          4,795                  10/12/21   12/02/22    Fahs Const Group, Inc               
                                                            GC-069          2,211                  11/01/21   12/07/22    Fahs Const Group, Inc               
                                                            GC-076          4,247                  12/20/21   01/23/23    Fahs Const Group Inc                
                                                            GC-077          1,028                  01/21/22   02/01/23    Fahs Const Group Inc                
                                                            GC-078          3,630                  01/21/22   02/01/23    Fahs Const Group Inc                
                                                            GC-080          1,224                  01/21/22   02/01/23    Fahs Const Group Inc                
                                                            GC-082        -20,000                  11/25/22   09/19/23    FAHS CONST GROUP INC                
                                                            HC-002            315                  09/07/21   11/23/22    KIMBLE, INC                         
                                                            HC-007          3,553                  01/21/22   11/17/22    Kimble Inc                          
                                                            HC-013         16,476                  01/21/22   11/17/22    Kimble Inc                          
                                                            HC-014          3,919                  02/22/22   12/20/22    KIMBLE, INC                         
                                                            HC-016          2,573                  05/09/22   03/13/23    Kimble Inc                          
                                                            PC-002          1,356                  02/26/21   04/15/21    FREY & CAMPBELL, INC.               
                                                            PC-003          2,054                  03/22/21   05/20/21    FREY & CAMPBELL, INC.               
                                                            PC-004         12,639                  03/26/21   05/12/21    FREY & CAMPBELL, INC.               
                                                            PC-007          1,716                  09/07/21   11/23/22    FREY&CAMPBELL, INC                  
                                                            PC-009          2,139                  12/03/21   09/20/22    Frey&Campbell Inc                   
                                                            PC-011          1,244                  12/03/21   09/20/22    Frey&Campbell Inc                   
                                                            PC-014          6,673                  02/22/22   12/20/22    FREY & CAMPBELL, INC.               
                                                            SC-002            602                  11/08/21   12/12/22    BHolands Excavating&Topsoil,Inc     
 
19-0084   Reconstruction               0-006-018  09/11/19  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0021SC Visual Structural Inspection 0-006-SC1  07/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          I.T. Annex Bldg:
22-0620   Reconstruction               3-005-002  02/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage/Mntnce - Prorate BldgAid:
98-1582   Additions and Alterations    5-004-003  10/06/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1             -441                  02/22/02   03/29/02    Shisler Elec.                       
                                                            MC-1           -2,480                  05/04/01   02/11/02    James Lewis                         
 
08-0110   Reconstruction               5-004-004  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-006               0                  10/26/09   11/19/09    JOHN MILLS ELECTRICAL INC           
                                                            E-013          16,847                  01/11/10   02/25/10    JOHN MILLS ELECTRICAL INC           
                                                            E-039           2,959                  09/28/10   11/01/10    JOHN MILLS ELECTRICAL INC           
                                                            E-041             772                  10/14/10   10/22/10    JOHN MILLS ELECTRICAL INC           
                                                            GC-016              0                  04/16/10   06/24/10    MASSA CONSTRUCTION INC              
                                                            P-003               0                  11/09/09   02/26/10    HMI MECHANICAL SYSTEMS INC          
                                                            P-004           2,995                  11/09/09   02/26/10    HMI MECHANICAL SYSTEMS INC          
                                                            SC-001         15,993                  12/04/09   01/22/10    W&D SMITH AND SONS CONSTRUCTION INC 
                                                            SC-002         15,117                  12/04/09   01/22/10    W&D SMITH AND SONS CONSTRUCTION INC 
                                                            SC-015          8,027                  09/28/10   11/01/10    W.D. SMITH & SONS INC               
                                                            SC-017          3,058                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-018         16,975                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-019         19,218                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-020         10,682                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-021         21,137                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-022         10,889                  02/27/12   08/06/12    W.D. SMITH & SONS INC               
                                                            SC-026          6,627                  10/08/10   10/25/10    W.D. SMITH & SONS INC               
                                                            SC-030            337                  10/08/10   10/25/10    W.D. SMITH & SONS INC               
                                                            SC-035        -12,118                  11/03/10   11/12/10    W.D. SMITH & SONS INC               
                                                            SC-038          4,194                  11/08/10   11/12/10    W.D. SMITH & SONS INC               
 

          Concession Stand:
15-1369   New Construction             7-011-001  07/21/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
96-1397   Reconstruction               7-999-002  05/06/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1430   Reconstruction               7-999-003  05/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0111   Reconstruction               7-999-005  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  07/13/09   08/28/09    FINGER LAKES TECHNOLOGIES GROUP INC 
                                                            T-002           6,930                  09/30/09   11/19/09    FINGER LAKES TECHNOLOGIES GROUP INC 
                                                            T-003             475                  10/08/09   10/30/09    FINGER LAKES TECHNOLOGIES GROUP INC 
                                                            T-004               0                  12/16/09   01/21/10    FINGER LAKES TECHNOLOGIES GROUP INC 
                                                            T-005             686                  11/23/09   03/30/10    FINGER LAKES TECHNOLOGIES GROUP INC 
                                                            T-006           5,542                  06/23/10   08/25/10    FINGER LAKES TECHNOLOGIES GROUP INC 
                                                            T-007           7,092                  08/09/10   09/07/10    FINGER LAKES TECHNOLOGIES GROUP INC 
 
16-0826   Reconstruction               7-999-006  04/24/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0697   Reconstruction               7-999-007  01/23/18  NO CHANGE ORDERS ON ELECTRONIC FILE

BOCES TOMPKINS-SENECA-TIOGA STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-90-00-00
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          F Bldg Greenhouse:
05-0816   Reconstruction               0-008-003  03/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6               2,657                  10/29/07   11/08/07    A. W. FARRELL & SON, INC.           
 
06-0359   Reconstruction               0-008-004  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1210   Reconstruction               0-008-005  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               175                  07/23/13   08/15/13    JOHNSON CONTROLS INC                
 

          G Powell Bldg B:
94-0611   Additions and Alterations    0-009-003  03/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1157   Reconstruction               0-009-004  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            -2,548                  11/05/02   09/05/03    McPherson Builders                  
                                                            G-3             2,012                  07/14/03   07/24/03    McPherson Builders                  
 
05-0817   Reconstruction               0-009-005  03/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              53,392                  10/29/07   11/08/07    A.W. Farrell & Son, Inc.            
                                                            3              51,391                  03/20/07   11/09/07    A.W farrell & son inc               
                                                            9B              5,124                  10/29/07     /  /      A. W. FARRELL & SON, INC.           
 
06-0360   Reconstruction               0-009-006  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1211   Reconstruction               0-009-007  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,900                  07/23/13   08/15/13    JOHNSON CONTROLS INC                
 
19-1893   Reconstruction               0-009-008  08/25/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-007         29,586                  07/10/23   12/28/23    JOHN MILLS ELECTRIC                 
                                                            EC-014          3,307                  07/10/23   12/28/23    JOHN MILLS ELECTRIC                 
                                                            EC-12           6,752                  07/10/23   12/28/23    JOHN MILLS ELECTRIC                 
                                                            GC-004          7,771                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-010          2,850                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-017         15,648                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-020           -667                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            RC-003          9,242                  07/10/23     /  /      DIAMOND ROOFING                     
 

          C Building - Career & Technology:
01-1158   Reconstruction               0-010-003  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            -2,823                  11/05/02   09/05/03    McPherson Builders                  
                                                            G-4             2,355                  07/14/03   07/24/03    McPherson Builders                  
 
05-0818   Reconstruction               0-010-004  03/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5               4,652                  10/29/07   11/08/07    A. W. FARRELL & SON, INC.           
                                                            9C              5,124                  10/29/07   11/09/07    A. W. FARRELL & SON, INC.           
 
06-0361   Reconstruction               0-010-005  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0957   Reconstruction               0-010-006  04/27/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1212   Reconstruction               0-010-007  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            20,052                  07/23/13   08/15/13    JOHNSON CONTROLS INC                
 
12-1187   Reconstruction               0-010-008  02/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1894   Reconstruction               0-010-009  08/25/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-006         14,862                  07/10/23   12/28/23    JOHN MILLS ELECTRIC                 
                                                            SC-002         25,570                  07/10/23     /  /      BROOME BITUMINOUS                   
 

          Occ Ed Bldg D:
01-1159   Reconstruction               0-011-003  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            -2,946                  11/05/02   09/05/03    McPherson Builders                  
                                                            G-5             2,347                  07/14/03   07/24/03    McPherson Builders                  
 
05-0819   Reconstruction               0-011-004  03/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,076                  10/29/07   11/09/07    A.W. Farrell & Son Inc              
                                                            10D             2,036                  11/16/07   12/27/07    A.W. Farrell & Son                  
 
06-0362   Reconstruction               0-011-005  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1213   Reconstruction               0-011-006  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            23,292                  07/23/13   08/15/13    JOHNSON CONTROLS INC                
 
11-0265   Reconstruction               0-011-007  01/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001           -175                  04/07/14   04/21/14    James & Son Construction Co., Inc.  
                                                            HC-001          1,539                  11/19/13   01/30/14    Airtech Heating & A/C Systems, Inc. 
 
19-1895   Reconstruction               0-011-008  08/25/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-005          6,961                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-007          3,635                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            SC-003        -91,175                  07/10/23     /  /      BROOME BITUMINOUS                   
 

          Smith Special Ed Blg:
94-0612   Additions and Alterations    0-012-005  03/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1462   Reconstruction               0-012-006  07/08/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1336   Reconstruction               0-012-007  04/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0820   Reconstruction               0-012-009  03/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10E.1           2,036                  11/16/07   12/27/07    A.W. Farrell & Son Inc.             
                                                            10E.2           2,036                  11/16/07   12/27/07    A.W. Farrell & Son Inc              
                                                            2E              8,881                  10/29/07   11/09/07    A.W. Farrell & Son, Inc.            
                                                            4              52,426                  10/29/07   11/09/07    A.W. Farrell & Son, INc             
                                                            9E              5,124                  10/29/07   11/09/07    A. W. FARRELL & SON, INC.           
 
06-0363   Reconstruction               0-012-010  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1214   Reconstruction               0-012-011  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           261,604                  07/23/13   08/15/13    JOHNSON CONTROLS INC                
 
19-1896   Reconstruction               0-012-012  08/25/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-005          8,890                  07/10/23   12/28/23    JOHN MILLS ELECTRIC                 
                                                            EC-013          9,383                  07/10/23   12/28/23    JOHN MILLS ELECTRIC                 
                                                            EC-015          1,354                  07/10/23   12/28/23    JOHN MILLS ELECTRIC                 
                                                            GC-006           -773                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-008          6,134                  07/10/23     /  /      STREETER ASSCIATES                  
                                                            GC-018          9,658                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-019          5,907                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            MC-007          2,965                  07/10/23     /  /      KIMBLE MECHANICAL                   
                                                            MC-008         13,369                  07/10/23     /  /      KIMBLE MECHANICAL                   
                                                            RC-004        -35,769                  07/10/23     /  /      DIAMOND ROOFING                     
                                                            SC-001         35,900                  07/10/23     /  /      BROOME BITUMINOUS                   
 

          Relocatable/Adult Ed./Adm.:
06-0364   Reconstruction               0-014-002  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1215   Reconstruction               0-014-003  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               525                  07/23/13   08/15/13    JOHNSON CONTROLS INC                
 

          CTE Greenhouse:
15-0194   New Construction             0-020-001  11/10/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Building A-Administration:
01-1156   Reconstruction               1-001-001  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-2             1,127                  07/14/03   07/24/03    McPherson Builders                  
                                                            G1             -1,211                  11/05/02   09/05/03    McPherson Builders                  
 
00-1668   Reconstruction               1-001-003  06/11/01  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0821   Reconstruction               1-001-004  03/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10              2,036                  11/16/07   12/27/07    A.W. Farrell & Son                  
                                                            10G             2,036                  11/16/07   12/27/07    A.W. Farrell & Sons                 
                                                            7              40,987                  10/29/07   11/09/07    A. W. FARRELL & SON, INC.           
                                                            9A              5,124                  10/29/07   11/09/07    A. W. FARRELL & SONS, INC.          
 
06-0365   Reconstruction               1-001-005  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1216   Reconstruction               1-001-006  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,323                  07/23/13   08/15/13    JOHNSON CONTROLS INC                
 
19-1897   Reconstruction               1-001-007  08/25/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1156   Reconstruction               1-001-009  01/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003         -4,060                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-009            496                  07/10/23     /  /      STREETER ASSOCIATES                 
                                                            GC-016          1,761                  07/10/23     /  /      STREETER ASSOCIATES                 
 

          G Bldg Greenhouse:
09-1217   Reconstruction               2-007-004  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,100                  07/23/13     /  /      JOHNSON CONTROLS INC                
 
19-1898   Reconstruction               2-007-005  08/25/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          G BLDG Warehouse/Bus Maint.:
05-0822   Reconstruction               5-007-001  03/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               8,881                  11/26/07   12/27/07    A.W Farrell & Son inc               
 
06-0366   Reconstruction               5-007-002  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1157   Reconstruction               5-007-003  01/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Spec.Ed. Train & Resource Library:
06-0367   Reconstruction               6-003-002  11/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1218   Reconstruction               6-003-003  12/23/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               525                  07/23/13     /  /      JOHNSON CONTROLS INC                
 

          District Wide:
95-0307   Reconstruction               7-999-001  10/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0503   Reconstruction               7-999-002  12/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1020   Reconstruction               7-999-003  01/30/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          1,634                  01/07/21   03/15/21    SCHULER-HASS ELECTRIC CORP.         
                                                            EC-01         -11,745                  07/10/23   12/28/23    SCHULER-HAAS ELECTRIC CORP          
                                                            GC-001          8,603                  11/23/20   02/05/21    POWER CONSTRUCTION GROUP, INC.      
                                                            GC-002          9,292                  11/23/20   02/05/21    POWER CONSTRUCTION GROUP, INC.      
                                                            GC-003          9,790                  11/23/20   02/05/21    POWER & CONSTRUCTION GROUP, INC.    
                                                            GC-004          3,961                  11/23/20   02/05/21    POWER & CONSTRUCTION GROUP, INC.