BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-01-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Junior-Senior High School:
94-0995   Reconstruction               0-001-004  03/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0069   Reconstruction               0-001-006  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1059   Reconstruction               0-001-007  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0175   Additions and Alterations    0-001-009  04/19/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01          50,028                  06/22/06   06/26/06    HMJ Electrical                      
                                                            GC-01          42,996                  06/22/06   06/26/06    Stalco Construction                 
                                                            GC-02          89,842                  06/22/06   06/26/06    Stalco Construction                 
                                                            GC-03          18,834                  06/22/06   06/26/06    Stalco Construction                 
                                                            GC-3           18,834                  09/28/04   10/04/04    Stalco Construction                 
                                                            MC-1           36,192                  12/22/03   12/31/03    Heating Piping Specialties          
                                                            MC-2            2,400                  12/22/03   12/31/03    Heating Piping Specialties          
                                                            PC-01          33,478                  06/22/06   06/26/06    ARA Plumbing                        
 
04-0202   Reconstruction               0-001-010  09/16/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0653   Reconstruction               0-001-012  05/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            48,300                  12/08/08   04/14/09    BEST ROOFING OF NJ INC.             
 
07-2342   Reconstruction               0-001-013  07/16/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0607   Reconstruction               0-001-014  07/14/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0760   Reconstruction               0-001-015  09/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             4,817                  12/08/08   02/04/09    HI-LUME CORPORATION                 
 
08-1588   Reconstruction               0-001-016  04/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0078   Reconstruction               0-001-017  08/28/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0846   Reconstruction               0-001-018  06/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -47,299                  05/26/16   06/06/16    MILCON CONSTRUCTION CORP            
 
14-0590   Reconstruction               0-001-019  04/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              94,500                  12/16/15   01/06/16    The LandTek Group Inc.              
                                                            1              38,832                  02/29/16   03/07/16    Relle Electric                      
                                                            1             -30,000                  10/11/16   10/26/16    Roland's Electric, Inc.             
                                                            2              15,000                  02/29/16   03/07/16    The LandTek Group Inc.              
                                                            2               6,351                  07/06/16   07/27/16    Relle Electric                      
                                                            3              50,000                  06/22/17   07/05/17    The LandTek Group Inc.              
 
14-1031   Reconstruction               0-001-020  02/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -33,665                  06/22/17   07/14/17    Renu Contracting & Restoration      
                                                            1             -10,500                  01/29/18   02/05/18    JNS Heating Service, Inc.           
                                                            1              -2,987                  01/29/18   02/05/18    Hirsch & Co. LLC                    
                                                            1              -6,188                  03/29/18   04/05/18    Nickerson Corporation               
                                                            1             -44,950                  05/11/18   06/01/18    Stalco Construction, Inc.           
                                                            1             -28,186                  05/11/18   06/04/18    Bancker Electric Co.                
                                                            1R            -16,379                  07/07/17   10/30/17    Hirsch & Co. LLC.                   
                                                            1R             -8,500                  12/04/17   12/15/17    QG Mechanical Services Co.          
                                                            1R            -15,000                  08/30/18   09/21/18    BAR BOY PRODUCTS                    
                                                            1R                922                  03/29/18   04/12/18    VSC Electric                        
 
15-0601   Reconstruction               0-001-021  11/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,698                  03/06/18   05/21/18    Hirsch Plumbing & Co.               
                                                            1             -24,034                  03/19/19   03/21/19    PALACE ELECTRICAL CONTRACTORS       
                                                            1R              4,519                  01/04/19   02/12/19    D7S MECHANICAL SERVICES, INC.       
 
16-0515   Reconstruction               0-001-022  05/30/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,766                  02/22/19   03/08/19    ARROW STEEL WINDOW CORP.            
                                                            2             -13,000                  05/28/19   06/07/19    ARROW STEEL WINDOW CORP.            
 
17-0430   Reconstruction               0-001-023  01/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  02/11/19   02/28/19    HI-TECH AIR CONDITIONING            
                                                            1             -25,000                  02/11/19   03/12/19    THE PATRIOT ORGANIZATION            
                                                            1               4,663                  02/22/19   03/05/19    PALACE ELECTRICAL CONTRACTORS       
                                                            1R              3,701                  03/19/19   03/21/19    AMBROSIO & COMPANY                  
 
18-2169   Reconstruction               0-001-024  07/22/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -17,500                  08/13/21   04/20/22    JNS HEATING SERVICE, INC            
 
19-1457   Reconstruction               0-001-025  04/20/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1879FP Reconstruction               0-001-FP1  10/23/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0880SC Visual Structural Inspection 0-001-SC1  01/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Memorial Grade School:
94-0996   Reconstruction               0-002-004  03/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1556   Reconstruction               0-002-005  07/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1060   Reconstruction               0-002-007  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0176   Reconstruction               0-002-008  04/19/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-1           10,261                  12/22/03   01/14/04    Bana Electric                       
                                                            MC-01           7,450                  06/22/06   06/26/06    ARA Plumbing                        
 
13-0872   Reconstruction               0-002-010  08/27/13  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0608   Reconstruction               0-002-011  07/14/09  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0605   Reconstruction               0-002-012  09/29/17  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0591   Reconstruction               0-002-014  05/15/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,663                  04/08/16   04/19/16    Roland's Electric, Inc.             
                                                            1             -17,490                  07/06/16   07/27/16    Louis Barbato Landscaping, Inc.     
                                                            1             -10,740                  12/23/16   01/27/17    PB Contracting, Inc.                
 
15-0602   Reconstruction               0-002-015  08/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,060                  01/29/18   02/05/18    Hirsch & Co. LLC                    
                                                            1              15,261                  05/11/18   05/16/18    Akal Builders Inc.                  
                                                            1             -10,000                  10/31/18   11/13/18    JNS HEATING SERVICE INC             
                                                            1              -3,000                  10/31/18   11/13/18    JNS HEATING SERVICE INC             
                                                            1               2,252                  03/19/19   03/21/19    PALACE ELECTRICAL CONTRACTORS, INC  
                                                            1R            -15,000                  08/30/18   11/09/18    BAR BOY PRODUCTS                    
 
15-1201   Reconstruction               0-002-016  08/29/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -20,000                  12/04/17   12/26/17    Pella General Construction Corp.    
                                                            1             -10,000                  12/29/17   01/23/18    Arrow Steel Windows                 
                                                            1             -40,000                  05/11/18   05/31/18    Roadwork Ahead                      
 
16-0517   Reconstruction               0-002-017  06/12/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -25,001                  12/14/18   01/23/19    THE PATRIOT ORGANIZATION            
                                                            1              -7,000                  12/14/18   01/11/19    WEST BABYLON ELECTRIC               
                                                            1              -8,000                  01/04/19   02/01/19    PALACE ELECTRICAL CONTRACTORS       
                                                            1             -10,000                  05/28/19   05/30/19    D&S MECHANICAL SERVICES             
                                                            1              -8,653                  01/29/20   02/28/20    HI-TECH AIR CONDITIONING SVC.,INC.  
                                                            1R             -5,000                  03/19/19   03/20/19    AMBROSIO & COMPANY                  
                                                            2             -30,000                  02/11/19   03/15/19    THE PATRIOT ORGANIZATION            
 
03-0357FP Reconstruction               0-002-FP1  10/23/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary School:
94-0997   Reconstruction               0-003-005  03/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1557   Reconstruction               0-003-006  07/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1061   Reconstruction               0-003-008  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0177   Additions and Alterations    0-003-009  04/19/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-02          33,000                  06/22/06   06/26/06    HMJ Electrical                      
                                                            GC-2           88,226                  06/22/06   06/26/06    Irwin Contracting                   
                                                            MC-02          73,578                  06/22/06   06/26/06    HVAC INC                            
 
08-0609   Reconstruction               0-003-011  07/14/09  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0873   Reconstruction               0-003-012  08/27/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1293   Reconstruction               0-003-013  04/30/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,525                  04/15/15   04/24/15    Statewide Roofing, Inc.             
                                                            2              18,400                  02/29/16   03/07/16    Statewide Roofing, Inc.             
 
13-1457   Reconstruction               0-003-014  06/02/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,180                  02/19/15   03/17/15    OG Mechanical Services Co Inc       
                                                            2              -1,365                  09/09/15   10/28/15    QG Mechanical Service Co., Inc.     
 
14-0592   Reconstruction               0-003-015  05/15/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  12/23/16   01/27/17    PB Contracting, Inc.                
 
15-0603   Reconstruction               0-003-016  09/16/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  12/29/17   02/05/18    Hirsch & Company, LLC               
                                                            1             -15,261                  05/11/18   06/01/18    Akal Builders Inc.                  
                                                            1             -10,000                  06/28/18   07/26/18    PREFERRED CONSTRUCTION              
                                                            1               2,817                  03/19/19   03/21/19    PALACE ELECTRICAL CONTRACTORS,INC   
                                                            1R            -10,000                  08/30/18   11/09/18    BAR BOY PRODUCTS                    
                                                            1R            -10,000                  10/31/18   11/13/18    D&S MECHANICAL SERVICES INC         
 
15-1202   Reconstruction               0-003-017  08/29/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  12/29/17   03/07/18    Watral Brothers, Inc.               
                                                            1             -10,000                  03/29/18   04/12/18    Arrow Steel Windows                 
 
03-0881SC Visual Structural Inspection 0-003-SC1  01/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Babylon Public Library:
90-1728   Reconstruction               6-008-002  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0311   Reconstruction               6-008-003  10/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2429   Additions and Alterations    6-008-004  03/13/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          8,053                  10/20/05     /  /      Sj electric inc                     
                                                            EC-002          1,938                  10/20/05   10/27/05    Sj Electric Inc                     
                                                            EC-003          2,237                  10/20/05   10/27/05    Sj Electric Inc                     
                                                            EC-004          4,184                  10/20/05   10/27/05    SJ Electric Inc                     
                                                            GC-001        -25,000                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-002          3,000                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-003         19,949                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-004          2,904                  10/20/05     /  /      LD Wenger Construction              
                                                            GC-005          3,450                  10/20/05   11/08/05    Ld Wenger Construction              
                                                            GC-006         -3,000                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-007          6,384                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-008          6,761                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-009          4,396                  10/20/05   11/08/05    LD wenger Construction              
                                                            GC-010         -1,794                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-011            443                  10/20/05   11/08/05    LD Wenger Construction              
                                                            GC-012          6,440                  10/20/05   11/08/05    Ld wenger Construction              
                                                            GC-013          4,294                  10/20/05   11/08/05    Ld Wenger Construction              
                                                            GC-015          1,720                  02/01/06   06/30/06    Ld Wenger Construction              
                                                            GC-016          8,287                  02/01/06   06/30/06    Ld Wenger Construction              
                                                            GC-017          4,042                  02/01/06   06/30/06    Ld Wenger Construction              
                                                            GC-020          3,344                  02/01/06   06/30/06    Ld Wenger Construction              
                                                            GC-021          2,085                  02/01/06   06/30/06    LD Wenger Construction              
                                                            GC014             678                  02/01/06   06/30/06    LD Wenger Construction              
                                                            GC018             520                  02/01/06   06/30/06    Ld Wenger Construction              
                                                            GC019             872                  02/01/06   06/30/06    Ld Wenger Construction              
                                                            HC-001         -1,000                  10/20/05     /  /      All Weather Temp Control            
                                                            MW-001          7,200                  10/20/05   11/08/05    AR kropp Co and Sons                
                                                            MW-002          3,375                  10/20/05   11/08/05    AR kropp Co and Sons                
                                                            MW-003         13,050                  10/20/05   11/08/05    AR kropp Co and Sons                
                                                            MW-004         14,900                  10/20/05   11/08/05    AR Kropp Co and Sons                
                                                            Mw-005          7,125                  10/20/05     /  /      AR Kropp co and sons                
                                                            PC-001          1,173                  10/20/05   10/27/05    Maccarone Plumbing                  
                                                            PC-002          2,023                  02/01/06   06/30/06    Maccarone Plumbing                  
                                                            PC-003         -1,358                  02/01/06   06/30/06    Maccarone Plumbing                  
                                                            PC-005          3,279                  02/01/06   06/30/06    Maccarone Plumbing                  
                                                            Pc-004          9,835                  02/01/06   06/30/06    Maccarone Plumbing                  
 

WEST BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-02-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Senior High School:
91-1556   Reconstruction               0-001-006  07/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0837   Reconstruction               0-001-007  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1134   Reconstruction               0-001-010  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0121   Reconstruction               0-001-011  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0126   Reconstruction               0-001-012  08/07/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1664   Reconstruction               0-001-013  07/01/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1107   Reconstruction               0-001-014  04/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1337   Reconstruction               0-001-015  05/10/99  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0726   Reconstruction               0-001-016  02/06/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0218   Reconstruction               0-001-017  11/02/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0932   Reconstruction               0-001-019  04/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0308   Reconstruction               0-001-020  05/13/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,908                  03/24/04   03/30/04    Pella Gen. Const.                   
                                                            1               5,109                  05/03/04   05/07/04    JS McHugh                           
                                                            1              -2,497                  09/13/04   10/27/04    Reel Mech.                          
                                                            1             -13,216                  09/13/04   10/27/04    Majestic Plumbing                   
                                                            1              16,366                  11/17/04   11/24/04    Corporate Elec.                     
                                                            2              -2,743                  09/13/04   10/27/04    Pella Gen. Const.                   
                                                            3               6,447                  02/07/05   03/14/05    Pella general Construction          
 
00-0620   Reconstruction               0-001-021  03/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,650                  12/18/01   04/19/02    WGP Contracting                     
                                                            1               2,250                  04/01/02   05/07/02    Total A.C.                          
                                                            2                 500                  12/18/01   02/28/02    West Babylon Elec.                  
                                                            3               4,900                  12/18/01   02/28/02    West Babylon Elec.                  
                                                            3               3,665           3,665  04/28/04   04/30/04    WGP Contracting                     
                                                            4               2,200                  03/13/02   04/19/02    West Babylon Elec.                  
                                                            4              -3,000                  12/12/03   12/12/03    WGP Contracting                     
                                                            5                 990                  03/13/02   04/19/02    West Babylon Elec.                  
                                                            6                 600                  03/13/02   04/19/02    West Babylon Elec.                  
                                                            7               1,325                  06/06/02   06/14/02    West Babylon Elec.                  
                                                            8               2,162                  06/06/02   06/14/02    West Babylon Elec.                  
 
03-0900   Reconstruction               0-001-022  06/14/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               4,491                  03/01/05     /  /      Major Systems Inc                   
                                                            1              10,600                  03/01/05     /  /      Manning Plumbing Heating            
                                                            1              19,531                  03/01/05   03/31/05    Lipsky Enteprises                   
                                                            1              15,760                  03/01/05   10/03/05    RMT Electric Corp                   
                                                            1              16,476                  06/29/06     /  /      Maccarone Plumbing                  
                                                            1             -40,000                  02/05/07   03/12/07    Barbizon Electric                   
                                                            2              10,074                  03/01/05   05/02/05    RMT Electric Corp                   
                                                            2              28,795                  05/02/05   06/10/05    Lipsky Enterprises                  
                                                            2               3,240                  03/05/07   08/15/07    Maccarone Plumbing                  
                                                            2              -3,000                  04/11/07   10/26/07    Major Systems                       
                                                            3              15,338                  03/01/05   10/03/05    RMT Electric Corp                   
                                                            3              26,637                  04/30/07   05/08/07    Lipsky Enterprises                  
                                                            4              29,048                  10/11/05     /  /      RMT Electric Corp                   
                                                            4              20,000          69,000  04/30/07   05/08/07    Lipsky Enterprises                  
                                                            5              13,283                  03/14/06   05/26/06    RMT Electric Corp                   
                                                            5              16,273                  04/30/07   05/08/07    Lipsky Enterprises                  
                                                            6              15,583                  03/14/06     /  /      RMT Electric Corp                   
                                                            7              13,717                  03/14/06   05/25/06    RMT Electric Corp                   
 
10-0304   Reconstruction               0-001-024  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1120   Reconstruction               0-001-025  05/08/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,067                  05/06/13   06/27/13    JNS Heating Services, Inc.          
                                                            2               1,000                  07/23/13   03/04/14    JNS Heating Services, Inc.          
 
15-0716   Reconstruction               0-001-027  08/10/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,795                  05/07/18   06/04/18    Maccarone Plumbing                  
                                                            1             -12,500                  07/15/19   07/16/19    KEVIN ANDERSON ELECTRIC, INC.       
                                                            2-SITE        -10,000                  01/08/19   02/08/19    WEB CONSTRUCTION CORP.              
                                                            GC-1           12,311                  05/31/18     /  /      Web Construction Corp.              
                                                            SC-1            9,922                  05/31/18     /  /      Web Construction Corp.              
 
15-0635   Reconstruction               0-001-028  01/14/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,798                  10/31/16   11/01/16    Laser Industries, Inc.              
                                                            1             -10,283                  02/01/19   03/15/19    PARSONS COMMERICAL, LLC             
                                                            2               1,116                  10/31/16   11/01/16    Laser Industries, Inc.              
 
16-0780   Reconstruction               0-001-029  02/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1359   Reconstruction               0-001-031  05/02/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1093   Reconstruction               0-001-032  02/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,506                  07/03/20   08/11/20    BEST CLIMATE CONTROL CORP.          
                                                            1             -23,761                  03/28/22   02/13/23    Stalco Const Inc                    
 
18-0108   Reconstruction               0-001-033  03/01/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2086   Reconstruction               0-001-034  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1300   Reconstruction               0-001-035  03/16/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2435   Reconstruction               0-001-036  12/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Junior High School:
91-1557   Reconstruction               0-002-004  07/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0188   Reconstruction               0-002-005  08/31/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0838   Reconstruction               0-002-006  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0387   Additions and Alterations    0-002-007  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1135   Reconstruction               0-002-010  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0122   Reconstruction               0-002-011  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0127   Reconstruction               0-002-012  08/07/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1106   Reconstruction               0-002-014  04/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0929   Additions and Alterations    0-002-015  08/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              17,995                  10/10/02   10/28/02    West Babylon Elec.                  
                                                            1              21,157                  06/24/03   07/11/03    West Babylon Elec.                  
                                                            1               3,745                  10/07/03   10/14/03    KEM Const.                          
                                                            1              -9,978                  03/02/04   03/03/04    Excel Builders Group                
                                                            1             -10,000                  03/24/04   04/23/04    Air Design                          
                                                            1               7,854                  06/23/06   06/26/06    Asplundh Const.                     
                                                            2              43,936                  10/10/02   10/28/02    Asplundh Const.                     
                                                            2              -8,000                  12/04/02   03/13/03    West Babylon Elec.                  
                                                            2              19,980                  09/03/03   10/14/03    West Babylon Elec.                  
                                                            2               1,765                  10/07/03   10/14/03    KEM Const.                          
                                                            3              10,980                  12/04/02   02/14/03    Asplundh Const.                     
                                                            3             -22,146                  03/24/04   04/23/04    West Babylon Elec.                  
                                                            3               1,661                  05/03/04   05/07/04    KEM Const.                          
                                                            4              -1,854                  02/03/03   02/05/03    Asplundh Const.                     
 
99-0385   Reconstruction               0-002-016  01/12/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0465   Reconstruction               0-002-017  01/06/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,032                  12/08/04   02/11/05    Walsh mechanical Contractors        
                                                            1              -5,000                  07/31/06   08/10/06    suburban Resotoration               
 
06-1407   Reconstruction               0-002-018  06/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2037   Reconstruction               0-002-019  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,350                  04/15/10   05/25/10    KEM CONSTRUCTION CORPORATION        
                                                            1              -2,500                  03/15/10   05/25/10    KEM CONSTRUCTION CORPORATION        
                                                            1              -1,696                  04/27/10   07/20/10    STALCO CONSTRUCTION INC             
                                                            1               7,349                  07/01/10   09/02/10    COOPER POWER & LIGHTING CORP        
 
06-1424   Reconstruction               0-002-020  05/31/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -2,248                  02/19/08   02/23/08    Hygrade Insulators                  
                                                            ML-JHS        -14,219                  04/28/08     /  /      ASTRO AV CORP.                      
 
10-0305   Reconstruction               0-002-022  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0018   Reconstruction               0-002-023  08/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1284   Reconstruction               0-002-024  04/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,325                  04/08/16   05/10/16    National Insulation and GC Corp.    
 
14-1285   Reconstruction               0-002-025  04/10/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              35,000                  12/16/15   01/15/16    Laser Industeries, Inc.             
                                                            1               3,799                  12/16/15   01/15/16    Parsons Electrical, LLC             
                                                            1             -14,331                  02/27/17   07/14/17    JBH Environmental, Inc.             
 
15-0340   Reconstruction               0-002-026  06/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,000                  02/27/17   03/03/17    Metro Paving, LLC                   
                                                            1             -20,000                  06/22/17   08/24/17    C&M Door Controls, Inc.             
                                                            1              15,154                  12/18/17   06/05/18    Ultimate Power Inc.                 
                                                            1             -26,528                  05/31/18   06/06/18    Web Construction Corp.              
                                                            1R             -4,930                  06/07/18   07/03/18    PALACE ELECTRICAL CONTRACTORS       
 
15-0496   Reconstruction               0-002-027  03/07/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0125   Reconstruction               0-002-028  12/20/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1             -10,500                  05/01/18   05/04/18    Locust Valley Electric, Inc.        
                                                            1             -25,000                  05/04/18   05/10/18    Total Construction Corp.            
                                                            1             -12,229                  10/03/18   10/26/18    S.J. HOERNING CONSTRUCTION INC      
 
16-0779   Reconstruction               0-002-030  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,166                  12/04/17   12/26/17    Hygrade Insulators Inc.             
                                                            1              -5,000                  01/29/18   02/02/18    Nickerson Corp.                     
 
22-2087   Reconstruction               0-002-031  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1301   Reconstruction               0-002-032  03/16/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Forest Avenue School:
92-0190   Reconstruction               0-003-004  03/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1432   Reconstruction               0-003-005  06/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0839   Reconstruction               0-003-006  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1131   Reconstruction               0-003-009  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0123   Reconstruction               0-003-010  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1272   Reconstruction               0-003-011  05/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1101   Reconstruction               0-003-012  04/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1147   Alterations                  0-003-013  08/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,900                  10/10/02   11/06/02    West Babylon Elec.                  
                                                            1               1,693                  10/10/02   11/06/02    EBC Co                              
                                                            2               6,222                  06/24/03   07/11/03    West Babylon Elec.                  
                                                            3               9,990                  09/03/03   09/05/03    West Babylon Elec.                  
                                                            4              -7,900                  03/24/04   04/28/04    West Babylon Elec.                  
 
99-0386   Reconstruction               0-003-014  01/12/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0466   Reconstruction               0-003-015  01/06/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,294                  05/27/04   06/07/04    Long Island Mech.                   
 
06-1408   Reconstruction               0-003-016  06/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1425   Reconstruction               0-003-017  05/31/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          -93,679                  02/19/08   02/23/08    Hygrade Insulators                  
 
10-0306   Reconstruction               0-003-018  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1098   Reconstruction               0-003-019  04/12/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  04/08/13   07/01/13    PELLA GENERAL CONSTRUCTION CORP     
                                                            2              -3,500                  08/28/13   09/20/13    Pella General Construction Co       
 
18-1094   Reconstruction               0-003-020  02/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,206                  07/03/20   08/12/20    ROSEMAR CONTRACTING, INC.           
                                                            1               8,750                  07/03/20   08/11/20    HIRSCH & CO., LLC                   
                                                            1              -6,246                  03/28/22     /  /      Stalco Const Inc                    
                                                            2              17,402                  04/27/21   05/19/21    ROSEMAR CONTRACTING, INC.           
 
16-0774   Reconstruction               0-003-021  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,396                  12/04/17   12/26/17    Hygrade Insulators Inc.             
 
22-2088   Reconstruction               0-003-023  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Santapogue Elementary School:
92-0191   Reconstruction               0-005-004  03/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0257   Reconstruction               0-005-005  10/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0991   Reconstruction               0-005-007  04/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1129   Reconstruction               0-005-008  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0124   Reconstruction               0-005-009  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1273   Reconstruction               0-005-010  05/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1104   Reconstruction               0-005-011  04/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0934   Reconstruction               0-005-013  04/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1409   Reconstruction               0-005-015  06/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2304   Reconstruction               0-005-016  01/29/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,500                  03/15/10   05/14/10    KEM CONSTRUCTION CORPORTATION       
                                                            1               4,361                  05/24/10   08/05/10    STALCO CONSTRUCTION INC             
                                                            1              -2,432                  07/01/10   09/03/10    COOPER POWER & LIGHTING CORP        
 
06-1426   Reconstruction               0-005-017  05/31/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -5,310                  02/19/08   02/23/08    Hygrade Insulators                  
 
10-0307   Reconstruction               0-005-019  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0776   Reconstruction               0-005-020  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,267                  12/04/17   12/26/17    Hygrade Insulators Inc.             
 
18-1095   Reconstruction               0-005-022  02/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -67,924                  07/03/20   08/12/20    ROSEMAR CONTRACTING, INC.           
                                                            1             -38,820                  03/28/22   02/13/23    Stalco Const Inc                    
 
22-2089   Reconstruction               0-005-023  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          South Bay School:
92-0192   Reconstruction               0-006-004  03/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1433   Reconstruction               0-006-005  06/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0840   Reconstruction               0-006-006  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1132   Reconstruction               0-006-009  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0125   Reconstruction               0-006-010  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1274   Reconstruction               0-006-011  05/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1102   Reconstruction               0-006-013  04/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0387   Reconstruction               0-006-016  01/12/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0933   Reconstruction               0-006-017  04/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1410   Reconstruction               0-006-019  06/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2305   Reconstruction               0-006-020  01/29/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -514                  03/15/10   05/14/10    KEM CONSTRUCTION CORPORATION        
                                                            1                 149                  04/27/10   07/21/10    STALCO CONSTRUCTION INC             
                                                            1               3,208                  07/01/10   09/03/10    COOPER POWER & LIGHTING CORP        
 
06-1427   Reconstruction               0-006-021  05/31/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -7,116                  02/19/08   02/23/08    Hygrade Insulators                  
 
10-0160   Reconstruction               0-006-023  09/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2090   Reconstruction               0-006-024  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1616   Reconstruction               0-006-025  03/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tooker Avenue Elementary:
92-0193   Reconstruction               0-007-004  03/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0841   Reconstruction               0-007-005  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1130   Reconstruction               0-007-008  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0126   Reconstruction               0-007-009  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1103   Reconstruction               0-007-011  04/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0172   Additions and Alterations    0-007-012  12/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,500                  10/10/02   10/28/02    Excel Builders Group                
                                                            1               7,551                  06/24/03   07/11/03    Bana Elec.                          
                                                            1             -10,000                  03/02/04   03/04/04    Air Design                          
                                                            2              10,578                  06/24/03   07/02/03    Bana Elec.                          
                                                            2               2,932                  09/03/03   09/05/03    Excel Builders Group                
                                                            3              10,876                  06/24/03   07/11/03    Bana Elec.                          
                                                            3              17,345                  05/10/04   05/17/04    Excel Building Group                
                                                            4              -1,763                  03/24/04   04/13/04    Bana Elec.                          
                                                            4                -741                  05/27/04   06/07/04    Excel Builders Group                
 
99-0388   Reconstruction               0-007-013  01/12/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0467   Reconstruction               0-007-014  01/06/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,164                  05/27/04   06/07/04    Long Island Mech.                   
 
06-1411   Reconstruction               0-007-015  06/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1428   Reconstruction               0-007-016  05/31/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -4,431                  02/19/08   02/23/08    Hygrade Insulators                  
                                                            M1-t           -1,783                  05/13/08   07/09/09    Astro Air Corp                      
 
10-0308   Reconstruction               0-007-017  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0126   Reconstruction               0-007-018  12/20/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              14,719                  12/18/17   02/02/18    Eldor Contracting Corp.             
                                                            1              32,593                  01/29/18   02/05/18    Laser Industries Inc.               
                                                            1             -15,196                  03/26/18   02/24/20    S.J. Hoerning Construction Inc.     
                                                            1              -6,329                  06/07/18   06/29/18    AMBROSIO PLUMBING & HEATING         
                                                            2R              9,791                  05/31/18   06/06/18    Eldor Contracting Corp.             
 
16-0777   Reconstruction               0-007-019  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,639                  12/04/17   12/26/17    Hygrade Insulators Inc.             
 
22-2091   Reconstruction               0-007-021  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          John F Kennedy Elementary School:
92-0194   Reconstruction               0-008-005  03/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0842   Reconstruction               0-008-006  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1133   Reconstruction               0-008-009  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0127   Reconstruction               0-008-010  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1105   Reconstruction               0-008-012  04/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1072   Reconstruction               0-008-013  03/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0151   Additions and Alterations    0-008-014  12/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              24,263                  06/24/03   07/02/03    Bana Elec.                          
                                                            1                 796                  09/03/03   09/16/03    Excel Builders                      
                                                            1              18,035                  12/24/03   01/08/04    Hirsch & Co.                        
                                                            1               2,168                  01/26/04   02/04/04    Air Design                          
                                                            2              10,876                  06/24/03   07/02/03    Bana Elec.                          
                                                            2                -573                  12/24/03   01/08/04    Hirsch & Co.                        
                                                            2             -10,867                  03/02/04   03/03/04    Excel Builders                      
                                                            2               7,295                  02/07/05     /  /      Air Design Inc                      
                                                            3                 952                  03/02/04   03/04/04    Bana Elec.                          
 
99-0389   Reconstruction               0-008-015  01/12/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,800                  09/07/01   01/14/03    ANS Tank & Environ.                 
 
99-0935   Reconstruction               0-008-016  04/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1412   Reconstruction               0-008-018  06/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2038   Reconstruction               0-008-019  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,250                  04/27/10   07/20/10    STALCO CONSTRUCTION INC             
                                                            1               1,195                  07/01/10   09/02/10    COOPER POWER & LIGHTING CORP        
                                                            2               6,225                  11/05/10   12/13/10    COOPER POWER & LIGHTING CORP        
 
06-1429   Reconstruction               0-008-020  05/31/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          -11,166                  02/19/08   02/23/08    Hygrade Insulators                  
 
10-0309   Reconstruction               0-008-021  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1286   Reconstruction               0-008-022  04/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,352                  12/16/15   01/06/16    Rosemar Construction, Inc.          
                                                            1             -10,000                  02/27/17   03/06/17    JBH Environmental, Inc.             
 
16-0775   Reconstruction               0-008-023  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,828                  12/04/17   12/26/17    Hygrade Insulators Inc.             
 
17-1360   Reconstruction               0-008-024  05/02/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0109   Reconstruction               0-008-025  03/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02               -205                  08/03/21   04/07/22    HIRSCH&CO, LLC                      
                                                            1             -21,400                  11/21/19   12/10/19    CROSSROADS CONSTRUCTION, INC.       
 
22-2092   Reconstruction               0-008-027  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXDistrict Wide(all clsrm bldgs):
93-0651   Reconstruction               0-999-001  03/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-0195   Reconstruction               5-004-005  03/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1430   Reconstruction               5-004-009  05/31/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0310   Reconstruction               5-004-011  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0778   Reconstruction               5-004-012  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  12/04/17   12/26/17    Hygrade Insulators Inc.             
 
22-2093   Reconstruction               5-004-014  11/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Babylon Public Library:
91-0428   Reconstruction               6-010-001  12/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0261   Additions and Alterations    6-010-002  12/12/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1019   Reconstruction               6-010-003  06/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-0001        -1,847                  07/17/07   08/01/07    E and A Restoration                 
                                                            PC-0002       -10,000                  01/25/08   03/19/08    E&A REATORATION                     
                                                            RC-0001       -13,000                  07/17/07   08/01/07    More Contracting                    
                                                            RC-0002        -3,073                  01/25/08   03/19/08    MORE CONTRACTING                    
                                                            RC-003        -11,130                  01/25/08   03/19/08    MORE CONTRACTING                    
                                                            RC-004          2,058                  01/25/08   03/19/08    MORE CONRACTING                     
 

          Drivers Building:
10-0311   Reconstruction               7-009-002  03/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
21-0642   Reconstruction               7-999-004  01/31/22  NO CHANGE ORDERS ON ELECTRONIC FILE

NORTH BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-03-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Senior High School:
90-0708   Reconstruction               0-002-008  04/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1143   Reconstruction               0-002-011  03/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1004   Reconstruction               0-002-012  04/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1345   Reconstruction               0-002-013  06/02/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Woods Road Elementary School:
91-0007   Reconstruction               0-007-006  08/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Belmont Lake Jr. High School:
91-0008   Reconstruction               0-009-002  08/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Babylon Public Library:
91-0393   Reconstruction               6-005-001  11/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
95-1206   Reconstruction               0-002-021  04/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0856   Reconstruction               0-002-023  03/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0440   Reconstruction               0-002-024  12/04/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1463   Reconstruction               0-002-025  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1491   Reconstruction               0-002-026  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1134   Reconstruction               0-002-027  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1144   Reconstruction               0-002-028  03/31/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0232   Reconstruction               0-002-030  09/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0300   Reconstruction               0-002-031  12/23/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         192,000                  02/06/01   01/13/03    JP Daly & Sons                      
                                                            00009          19,404                  02/19/03   03/24/03    Acoustic Technology                 
                                                            00010           5,024                  02/06/02   03/25/02    Acoustic Technology                 
                                                            00010           3,974                  06/04/02     /  /      Ultimate Power                      
                                                            00015           1,157                  02/06/02   03/25/02    ARA Plumbing                        
                                                            00016          41,225                  06/04/02   08/15/02    JP Daley                            
                                                            00017         117,000                  02/06/02   03/22/02    JP Daly                             
                                                            00018          42,344                  02/06/02   03/22/02    JP Daly                             
                                                            00019          85,000                  02/06/02   03/22/02    JP Daly                             
                                                            10               -500                  02/06/02   03/22/02    Lita Const.                         
                                                            11             55,057                  02/06/02   03/22/02    Lita Const.                         
                                                            12             59,850                  02/06/02   03/22/02    Lita Const.                         
                                                            13             61,775                  06/04/02   08/15/02    Lita Const.                         
                                                            14              8,542                  02/19/03   03/24/03    Lita Const.                         
                                                            15             70,569                  02/19/03   03/24/03    Lita Const.                         
                                                            16              6,008                  02/19/03   03/24/03    Lita Const.                         
                                                            3               7,424                  02/06/02   03/22/02    Arch. Window Mfg.                   
                                                            3              10,000                  02/19/03   03/24/03    Pella Gen. Const.                   
                                                            4              10,257                  02/06/02   03/22/02    Arch. Window                        
                                                            5               6,013                  02/19/03   03/24/03    Arch. Window                        
                                                            6              -1,392                  02/19/03   03/24/03    Arch. Window                        
                                                            9              37,062                  02/06/02   03/22/02    Lita Const.                         
 
04-0365   Reconstruction               0-002-032  12/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              37,761                  07/13/06   07/24/06    Fenley Nicol Environmental          
                                                            2               5,906                  12/28/07   01/07/08    Fenley & Nichol Environmental       
 
03-1274   Reconstruction               0-002-034  04/26/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0332   Reconstruction               0-002-035  03/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            -18,388                  01/08/13   06/28/13    JNS HEATING SERVICE INC             
                                                            01             -1,912                  06/23/13   07/26/13    A-1 Construction & Reno. Inc        
                                                            1              32,789                  01/25/13   06/28/13    CSD NET INC                         
 
17-1526   Reconstruction               0-002-036  06/11/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1527   Reconstruction               0-002-038  06/11/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,202                  12/19/18   02/12/19    LASER INDUSTRIES, INC.              
                                                            2              38,000                  12/19/18   02/12/19    LASER INDUSTRIEA, INC.              
                                                            3              76,000                  12/19/18   02/12/19    LASER INDUSTRIES,INC.               
                                                            4              13,484                  12/19/18   02/12/19    LASER INDUSTRIES, INC.              
 
17-1528   Reconstruction               0-002-039  06/11/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,563                  12/05/18   01/15/19    NIKERSON CORP                       
 
18-1128   Reconstruction               0-002-040  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -13,013                  03/09/20   06/29/20    WHM PLUMBING & HEATING CONTRACTORS  
                                                            1             -12,882                  07/30/20   10/27/20    ELDOR CONTRACTING CORP.             
                                                            1               1,047                  07/30/20   10/21/20    CROSSROADS CONSTRUCTION CORP.       
 
20-0003   Reconstruction               0-002-041  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1514   Reconstruction               0-002-042  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              52,829                  05/10/23   12/22/23    DIGITAL PROVISIONS                  
                                                            1              52,829                  05/10/23     /  /      DIGITAL PROVISON                    
 
20-0004   Reconstruction               0-002-043  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1019   Reconstruction               0-002-044  04/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              43,064                  05/10/23   12/22/23    BELFOR PROPERTY RESTORATION         
                                                            2               5,783                  05/10/23   12/22/23    BELFOR PROPERTY RESTORATION         
                                                            3               6,541                  05/10/23     /  /      BELFOR PROPERTY RESTORATION         
                                                            4              37,163                  05/10/23   12/22/23    BELFOR PROPERTY RESTORATION         
 
21-1163   Reconstruction               0-002-045  05/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0211   Reconstruction               0-002-047  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0856   Reconstruction               0-002-048  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1962   Reconstruction               0-002-049  06/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2302FP Reconstruction               0-002-FP1  08/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1404SC Visual Structural Inspection 0-002-SC1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Belmont Elementary:
92-1406   Reconstruction               0-003-011  07/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1492   Reconstruction               0-003-013  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0626   Additions and Alterations    0-003-015  02/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0301   Reconstruction               0-003-016  12/23/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          26,427                  02/06/01   01/13/03    Bain Heating                        
                                                            00001          61,000                  02/06/01   01/14/03    JP Daly                             
                                                            00001          26,427                  02/19/03   01/06/11    Bain Heating                        
                                                            00002          18,353                  02/06/01   01/13/03    Bain Heating                        
                                                            00003          60,000                  02/06/01   01/14/03    JP Daly                             
                                                            00003          13,000                  02/19/03     /  /      Bain Heating                        
                                                            00004          44,182                  06/04/02   08/15/02    Bain Heating                        
                                                            00004         105,000         105,000  02/19/03   12/01/03    JP Daly                             
                                                            00004          44,182                  02/19/03     /  /      Bain Heating                        
                                                            00005          13,000                  02/06/01   01/14/03    JP Daly                             
                                                            00007          19,971                  06/04/02   08/15/02    Lita Const.                         
                                                            00008          11,048                  06/04/02   08/15/02    JP Daly                             
                                                            1             -12,353                  02/19/03   06/05/13    Empire Restoration                  
                                                            3               4,295                  02/06/02   03/22/02    Arch. Window                        
                                                            4               4,160                  02/06/02   03/22/02    Arch. Window                        
                                                            5               3,436                  02/19/03   01/06/11    Arch. Window                        
                                                            6             -48,000                  02/06/02   03/22/02    AM Const.                           
                                                            6              -1,950                  02/19/03   01/06/11    Arch. Window                        
                                                            8                -500                  02/06/02   03/22/02    Lita Const.                         
                                                            9               5,775                  02/06/02   03/22/02    Lita Const.                         
 
03-1092   Reconstruction               0-003-018  04/29/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,000                  11/21/05   11/23/05    darr Construction                   
 
08-0333   Reconstruction               0-003-019  03/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,250                  01/25/13   07/02/13    MMJ ELECTRIC                        
 
17-0930   Reconstruction               0-003-020  02/27/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1129   Reconstruction               0-003-021  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,341                  03/09/20   06/29/20    AMBROSIO & CO.,INC.                 
                                                            1              30,325                  03/09/20   07/02/20    CROSSROADS CONSTRUCTION, INC.       
                                                            1R             -8,112                  06/23/20   08/03/20    ELDOR CONTRACTING CORP.             
 
20-0005   Reconstruction               0-003-022  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1020   Reconstruction               0-003-023  04/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0212   Reconstruction               0-003-024  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0693FA Reconstruction               0-003-025  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2301FP Reconstruction               0-003-FP1  08/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1444FP Reconstruction               0-003-FP2  06/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1405SC Visual Structural Inspection 0-003-SC1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Marion G. Vedder Elementary:
92-0443   Reconstruction               0-004-011  12/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1493   Reconstruction               0-004-016  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0627   Alterations                  0-004-018  02/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1750   Reconstruction               0-004-021  02/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              16,270                  06/04/02   08/15/02    Architectural Window Manufacturing  
                                                            2              17,572                  06/04/02   08/15/02    Bana Elec.                          
                                                            Asb-1           5,647                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-2           2,431                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-3          19,721                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-5           7,335                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-6           8,654                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-7             602                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-8           7,349                  02/06/02   03/22/02    DSA Services                        
                                                            Elec-1         18,617                  02/06/02   03/22/02    Bana Elec.                          
                                                            Elec-3         37,000                  02/06/02   03/22/02    Bana Elec.                          
                                                            Elec.-4         3,820                  02/06/02   03/22/02    Bana Elec.                          
                                                            Inter-1       190,938                  02/06/02   03/22/02    Marangos Const.                     
                                                            Inter-2        23,856                  02/06/02   03/22/02    Marangos Const.                     
                                                            Mech-1         18,134                  02/06/02   03/22/02    Bain Heating                        
                                                            Mech-2          1,459                  02/06/02   03/22/02    Bain Heating                        
                                                            Mech-3         13,818                  02/06/02   03/22/02    Bain Heating                        
                                                            Mech-4          7,093                  02/06/02   03/22/02    Bain Heating                        
                                                            Mech-5         15,727                  02/06/02   03/22/02    Bain Heating                        
                                                            Plumb-1        17,412                  02/06/02   03/22/02    ARA Plumbing                        
                                                            Plumb-2        67,407                  02/06/02   03/22/02    ARA Plumbing                        
                                                            Plumb-3           803                  02/06/02   03/22/02    ARA Plumbing                        
                                                            Rf-mas-1        4,064                  02/06/02   03/22/02    JNG Const.                          
                                                            Rf-mas-2        9,860                  02/06/02   03/22/02    JNG Const.                          
 
99-0352   Reconstruction               0-004-022  05/31/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0353   Reconstruction               0-004-024  03/31/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,753                  02/08/07   02/22/07    LM Specialty Co                     
 
08-0334   Reconstruction               0-004-025  03/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0918   Reconstruction               0-004-026  01/12/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0931   Reconstruction               0-004-027  02/27/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1130   Reconstruction               0-004-028  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,155                  03/09/20   07/02/20    CROSSROADS CONSTRUCTION, INC.       
                                                            1R             -3,417                  06/23/20   07/22/20    ELDOR CONTRACTING CORP.             
 
20-0006   Reconstruction               0-004-029  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1511   Reconstruction               0-004-030  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,190                  05/10/23   12/22/23    DIGITAL PROVISONS                   
 
20-0007   Reconstruction               0-004-031  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0314   Reconstruction               0-004-032  12/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1164   Reconstruction               0-004-033  05/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0213   Reconstruction               0-004-034  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0694FA Reconstruction               0-004-035  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1963   Reconstruction               0-004-036  06/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1406SC Visual Structural Inspection 0-004-SC1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Woods Road Elementary School:
95-1494   Reconstruction               0-007-013  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1135   Reconstruction               0-007-014  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0628   Additions and Alterations    0-007-015  02/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0302   Reconstruction               0-007-017  12/23/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          42,000                  02/06/01   01/13/03    JP Daly                             
                                                            00002         -15,254                  02/06/02   03/22/02    L&C Europa Contracting              
                                                            00002          13,000                  02/19/03   01/06/11    Bain Heating                        
                                                            00002          60,000          60,000  02/19/03   12/01/03    JP Daly                             
                                                            00003          34,797                  02/19/03   01/06/11    Bain Heating                        
                                                            00004          29,300                  02/06/01   01/14/03    JP Daly                             
                                                            00004          19,941                  02/19/03   01/06/11    Bain Heating                        
                                                            00004           4,737                  02/19/03   01/06/11    Lita Const.                         
                                                            00008           9,061                  06/04/02   08/15/02    JP Daly                             
                                                            10             -2,802                  06/04/02   08/15/02    AM Const. Ent.                      
                                                            11             -2,203                  04/03/03   04/17/03    AM Const. Ent.                      
                                                            3               3,436                  02/06/02   03/22/02    Arch. Window                        
                                                            4               3,386                  02/06/02   03/22/02    Arch. Window                        
                                                            5                -500                  02/06/02   03/22/02    Lita Const.                         
                                                            5               2,577                  02/19/03   01/06/11    Arch. Window                        
                                                            6              -1,950                  02/19/03   01/06/11    Arch. Window                        
                                                            7               4,961                  02/06/02   03/22/02    AM Const. Ent.                      
                                                            8               4,800                  02/06/02   03/22/02    AM Const. Ent.                      
                                                            9             -36,600                  02/06/02   03/22/02    AM Const. Ent.                      
 
03-1093   Additions and Alterations    0-007-018  04/29/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,604                  05/03/07   05/15/07    Adjo Contracting                    
                                                            2             -18,200                  11/16/07   02/23/08    Adjo Contracting Corp               
                                                            2             -18,200                  12/28/07   01/07/08    Adjo Contracting Corp.              
 
08-0335   Reconstruction               0-007-019  03/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,250                  01/08/13   06/28/13    MMJ ELECTRIC                        
 
17-0914   Reconstruction               0-007-020  05/01/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0932   Reconstruction               0-007-021  02/27/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1131   Reconstruction               0-007-022  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1R             -3,417                  06/23/20   07/22/20    ELDOR CONTRACTING CORP.             
                                                            2             -17,530                  03/09/20   06/30/20    CROSSROADS CONSTRUCTION, INC.       
 
20-0008   Reconstruction               0-007-023  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1512   Reconstruction               0-007-024  05/22/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0009   Reconstruction               0-007-025  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1021   Reconstruction               0-007-026  04/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,303                  05/10/23   12/22/23    BELFOR PROPERTY RESTORATION         
                                                            2              55,181                  05/10/23     /  /      BELFOR PROPERTY RESTORATION         
 
22-0214   Reconstruction               0-007-027  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1407SC Visual Structural Inspection 0-007-SC1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Parliament Place Elementary:
92-0328   Reconstruction               0-008-011  10/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1495   Reconstruction               0-008-014  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0629   Additions and Alterations    0-008-016  02/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1751   Reconstruction               0-008-017  02/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              24,405                  06/04/02   08/15/02    Architectural Window Manufacturing  
                                                            2               3,200                  06/04/02   08/15/02    Architectural Window Manufacturing  
                                                            3               4,318                  02/19/03   03/24/03    Architectural Window Manufacturing  
                                                            4               4,799                  04/03/03   04/17/03    Architectural Window Manufacturing  
                                                            Asb-1           1,267                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-2           1,267                  02/06/02   03/22/02    DSA Services                        
                                                            Asb-3           4,839                  02/06/02   03/22/02    Spector Group                       
                                                            Elec-1         88,000                  02/06/02   03/22/02    JP Daly & Sons                      
                                                            Elec-2         13,200                  02/06/02   03/22/02    JP Daly & Sons                      
                                                            Elec-3         40,000                  02/06/02   03/22/02    JP Daly & Sons                      
                                                            Elec-4         24,705                  02/06/02   03/22/02    JP Daly & Sons                      
                                                            Inter-1         6,400                  02/06/02   03/22/02    Spector Group                       
                                                            Inter-2        15,500                  02/06/02   03/22/02    Spector Group                       
                                                            Mech-1          8,576                  02/06/02   03/22/02    Bain Heating                        
                                                            Mech-2          3,063                  02/06/02   03/22/02    Bain Heating                        
                                                            Plumb-1         4,119                  02/06/02   03/22/02    ARA Plumbing                        
 
03-1094   Reconstruction               0-008-018  04/29/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,000                  11/21/05   11/23/05    Darr Construction equipment         
 
08-0336   Reconstruction               0-008-019  03/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0933   Reconstruction               0-008-020  02/27/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1132   Reconstruction               0-008-021  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -17,530                  03/09/20   07/02/20    CROSSROADS CONSTRUCTION, INC.       
                                                            1R             -3,417                  06/23/20   07/22/20    ELDOR CONTRACTING CORP.             
 
20-0010   Reconstruction               0-008-022  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1516   Reconstruction               0-008-023  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              23,639                  05/10/23   12/22/23    DIGITAL PROVISIONS                  
 
20-0011   Reconstruction               0-008-024  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1165   Reconstruction               0-008-025  05/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0215   Reconstruction               0-008-026  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0695FA Reconstruction               0-008-027  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1408SC Visual Structural Inspection 0-008-SC1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          PJ Brennan-leased to W Suffolk BOCES:
94-0976   Reconstruction               0-009-001  02/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0366   Reconstruction               0-009-002  12/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1496   Reconstruction               0-009-003  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0252   Reconstruction               0-009-004  10/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1156   Reconstruction               0-009-005  06/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1651   Reconstruction               0-009-006  07/27/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0959   Reconstruction               0-009-007  05/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0473   Reconstruction               0-009-008  12/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1034   Reconstruction               0-009-009  04/22/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1            -170,499                  07/30/07   08/07/07    Frendolph Construction              
 
18-1133   Reconstruction               0-009-010  03/06/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          William DeLuca Elementary:
92-1474   Reconstruction               0-010-013  07/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1497   Reconstruction               0-010-014  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0367   Reconstruction               0-010-015  12/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0630   Additions and Alterations    0-010-016  02/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1752   Reconstruction               0-010-017  02/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,725                  06/04/02   08/15/02    Architectural Window Manufacturing  
                                                            1               1,895                  02/19/03   04/03/03    Schindler Elevator                  
                                                            1              18,220                  02/19/03   04/03/03    Stalco Const.                       
                                                            1              -1,200                  02/19/03   04/03/03    Advanced Environ. Services          
                                                            1               6,185                  02/19/03   04/03/03    Advanced Conservation Systems       
                                                            1               2,527                  02/19/03   04/03/03    Astro Air                           
                                                            1              73,687                  04/03/03   04/17/03    Bana Elec.                          
                                                            2              45,344                  06/04/02   08/15/02    Architectural Window Manufacturing  
                                                            2               3,063                  02/19/03   04/03/03    Schindler Elevator                  
                                                            2               9,494                  02/19/03   04/03/03    Stalco Const.                       
                                                            2               9,514                  02/19/03   04/03/03    Astro Air                           
                                                            3              16,697                  02/19/03   04/03/03    Stalco Const.                       
 
04-0413   Reconstruction               0-010-021  01/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             221,550          41,268  02/08/07   03/09/07    Bancker Construction                
                                                            1             -11,025                  05/03/07   05/09/07    Watral Brothers                     
 
08-0337   Reconstruction               0-010-022  03/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0934   Reconstruction               0-010-023  02/27/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1134   Reconstruction               0-010-024  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,155                  03/09/20   07/02/20    CROSSROADS CONSTRUCTION, INC.       
                                                            1R             -3,417                  06/23/20   07/22/20    ELDOR CONTRACTING CORP.             
 
19-1513   Reconstruction               0-010-025  05/22/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0012   Reconstruction               0-010-026  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0315   Reconstruction               0-010-027  12/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1022   Reconstruction               0-010-028  04/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0216   Reconstruction               0-010-029  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2300FP Reconstruction               0-010-FP1  08/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1409SC Visual Structural Inspection 0-010-SC1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Robert Moses Middle School:
92-1475   Reconstruction               0-011-011  07/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0248   Reconstruction               0-011-014  09/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1012   Additions and Alterations    0-011-015  03/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1498   Reconstruction               0-011-016  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1136   Reconstruction               0-011-017  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0368   Reconstruction               0-011-020  12/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              20,851                  07/13/06   07/24/06    Fenley Nicol Environmental          
                                                            1              -2,169                  02/05/08   04/04/08    FENLEY & nICOL ENVIRONMENTAL        
                                                            2               2,953                  12/28/07   01/07/08    Fenley & Nicol Environmental        
 
99-1753   Reconstruction               0-011-021  02/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              20,400                  02/06/02   03/22/02    WB Contracting                      
                                                            1              40,112                  06/04/02   08/15/02    Archiectural Window Manufacturing   
                                                            1              15,553                  02/19/03   04/03/03    Stalco Construction                 
                                                            1              -4,362                  02/19/03   04/03/03    DSA Services                        
                                                            1               8,442                  02/19/03   04/03/03    Astro Air Corporation               
                                                            1               6,268                  02/19/03   04/03/03    Advanced Conservation Systems       
                                                            1              58,640                  04/03/03   04/17/03    Bana Electric                       
                                                            2               5,064                  02/19/03   04/03/03    Stalco Construction                 
                                                            2               7,275                  02/19/03   04/03/03    Astro Air Corporation               
                                                            2               2,924                  02/19/03   04/03/03    Advanced Conservation Systems       
                                                            3              16,167                  02/19/03   04/03/03    Stalco Construction                 
 
04-0482   Additions and Alterations    0-011-022  03/29/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              18,031                  04/10/06   07/24/06    JNS heating service                 
                                                            1              85,667                  09/07/06   01/09/07    Cooper Power Lighting               
                                                            1              -8,253                  01/09/06   02/22/07    Preferred Plumbing Heating          
                                                            1             212,318                  02/06/07   02/22/07    Bancker Construction                
                                                            1              44,950                  11/30/07   12/27/07    Capobianco, Inc.                    
                                                            2              19,338                  06/12/07   10/23/07    JNS Heating Service                 
                                                            2             -19,880                  12/26/08   06/25/09    COOPER POWER AND LIGHTING           
                                                            2             109,819                  03/17/09   05/20/09    CAPOBIANCO, INC.                    
 
08-0338   Reconstruction               0-011-024  03/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              35,178                  01/25/13   06/28/13    CSD NET INC                         
 
18-1135   Reconstruction               0-011-025  03/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -44,300                  03/09/20   07/02/20    CROSSROADS CONSTRUCTION, INC.       
                                                            1             -16,890                  06/23/20   07/22/20    ELDOR CONTRACTING CORP.             
                                                            1               9,261                  06/23/20   07/22/20    HIRSCH & CO.,INC.                   
 
19-1515   Reconstruction               0-011-026  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,931                  05/10/23   12/22/23    DIGITAL PROVISIONS                  
 
20-0013   Reconstruction               0-011-027  09/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1166   Reconstruction               0-011-028  05/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0217   Reconstruction               0-011-029  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0857   Reconstruction               0-011-030  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0696FA Reconstruction               0-011-031  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2303FP Reconstruction               0-011-FP1  08/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1410SC Visual Structural Inspection 0-011-SC1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg.:
95-1499   Reconstruction               1-001-001  06/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0218   Reconstruction               1-001-002  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
00-0692   Reconstruction               5-012-002  04/11/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0339   Additions and Alterations    5-012-006  03/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1569   Reconstruction               5-012-007  04/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0219   Reconstruction               5-012-008  02/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Babylon Public Library:
94-0036   Reconstruction               6-005-011  08/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1543   Reconstruction               6-005-013  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0574   Reconstruction               6-005-014  12/01/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1699   Additions and Alterations    6-005-015  09/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2160   Reconstruction               6-005-016  06/18/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1518   Reconstruction               6-005-017  06/29/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1692   Reconstruction               6-005-018  08/05/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0846   Reconstruction               6-005-019  03/08/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1453   Reconstruction               6-005-020  08/28/17  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1614   Reconstruction               6-005-021  07/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XX Press Box (demo'd 10/2018):
95-1198   New Construction             7-014-001  05/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Vacant Building (demolition):
16-1779   Reconstruction               7-029-001  05/15/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ High School:
17-1529   New Construction             7-031-001  06/11/18  NO CHANGE ORDERS ON ELECTRONIC FILE

LINDENHURST UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-04-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Kellum School - Lsd To Just Kids:
04-0510   Reconstruction               0-001-004  01/26/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              26,877                  12/12/06   01/30/07    J Anthony Enterprise                
 
04-0922   Reconstruction               0-001-005  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0841   Reconstruction               0-001-006  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -2,800                  03/06/09   06/25/09    C&M DOOR CONTROLS INC.              
 
10-1021   Reconstruction               0-001-007  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0026   Reconstruction               0-001-008  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1338   Reconstruction               0-001-009  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1033   Reconstruction               0-001-010  02/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1            -130,658                  03/11/20   06/30/20    ARROW STEEL WINDOW CORP.            
                                                            2             -25,000                  10/13/20   12/21/20    ARROW STEEL WINDOW CORP.            
 
07-1580SC Visual Structural Inspection 0-001-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lindenhurst Middle School:
90-1092   Reconstruction               0-002-004  04/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1245   Reconstruction               0-002-006  05/12/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0228   Reconstruction               0-002-007  09/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1464   Reconstruction               0-002-009  06/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0371   Additions and Alterations    0-002-010  01/14/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            8              14,676                  03/07/00   12/01/03    Quad Const.                         
 
98-0941   Reconstruction               0-002-012  05/21/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 -98                  12/17/03   12/29/03    Manning Plumbing                    
                                                            2              -3,457                  05/19/04   05/27/04    Wes Design & Supply                 
                                                            4               6,175                  10/18/00   12/01/03    Manning Plumbing                    
 
99-0958   Additions and Alterations    0-002-014  05/12/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,000                  03/11/02   04/19/02    JS McHugh                           
                                                            3              12,017                  08/09/05   08/10/05    Landtek Group                       
                                                            7               7,690                  12/10/01   02/28/02    Landtec Group                       
                                                            8               2,242                  12/10/01   02/28/02    Landtec Group                       
 
00-0472   Reconstruction               0-002-015  03/26/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,180                  05/13/04   05/14/04    Milcon Const.                       
                                                            10              1,767                  03/11/02   05/06/02    Marangos Const.                     
                                                            11              2,666                  03/11/02   05/06/02    Marangos Const.                     
                                                            12              3,261                  03/11/02   05/06/02    Marangos Const.                     
                                                            13              1,723                  03/11/02   05/06/02    Marangos Const.                     
                                                            14              3,534                  03/11/02   05/06/02    Marangos Const.                     
                                                            15             14,385                  07/08/02   10/30/02    Marangos Const.                     
                                                            16              6,480                  07/08/02   10/30/02    Marangos Const.                     
                                                            19-GC          14,773                  05/19/04   05/19/04    Marangos Const.                     
                                                            2                 636                  11/14/01   02/08/02    Marangos Const.                     
                                                            3               1,762                  11/14/01   05/22/02    Marangos Const.                     
                                                            3               8,999                  05/13/04   05/14/04    Milcon Const.                       
                                                            3-EL         -102,872                  03/20/03   03/24/03    Roland's Elec.                      
                                                            4               9,453                  05/13/04   05/14/04    Milcon Const.                       
                                                            4                 919                  05/19/04   05/19/04    Marangos Const.                     
                                                            5               2,595                  05/13/04   05/14/04    Milcon Const.                       
                                                            5               1,879                  05/19/04   05/19/04    Marangos Const.                     
                                                            6               3,711                  01/29/02   03/21/02    Marangos Const.                     
                                                            6               2,118                  05/13/04   05/14/04    Milcon Const.                       
                                                            7               2,945                  03/11/02   05/06/02    Marangos Const.                     
                                                            7              16,800                  05/13/04   05/14/04    Milcon Const.                       
                                                            8               2,592                  03/11/02   05/06/02    Marangos Const.                     
                                                            9              98,285                  03/11/02   05/06/02    Marangos Const.                     
                                                            EL-4           92,060                  02/12/04   03/03/04    Rolands Elec.                       
                                                            GC-17          18,547                  12/17/03   12/26/03    Marangos Const.                     
                                                            GC-18           2,208                  12/17/03   12/26/03    Marangos Const.                     
                                                            M-1            -2,407                  12/17/03   12/29/03    Smith Haven Mech.                   
                                                            P-1            -4,289                  12/17/03   12/29/03    Snow Industries                     
 
02-0045   Reconstruction               0-002-016  11/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0905   Reconstruction               0-002-018  01/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1041   Reconstruction               0-002-019  06/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0511   Reconstruction               0-002-020  01/26/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               3,000                  05/15/07   06/22/07    County Carpet                       
                                                            ONE            12,300                  11/23/05   02/13/06    The Landtek Group                   
                                                            TWO             8,809                  11/23/05   02/13/06    The Landtek group                   
 
04-0923   Reconstruction               0-002-021  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0842   Reconstruction               0-002-022  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SEVEN             812                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
 
07-0220   Reconstruction               0-002-023  12/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -5,000                  01/15/09   05/04/09    ROCON PLUMBING & HEATING            
                                                            ONE             3,750                  03/30/09   07/28/09    PALACE ELECTRICAL CONTRACTORS       
                                                            ONE           -16,000                  04/10/09   07/29/09    BARUTI CONSTRUCTION CORP.           
 
10-1022   Reconstruction               0-002-024  09/12/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0156   Reconstruction               0-002-025  09/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            52,823                  07/16/12   11/28/12    BARUTI CONSTRUCTION CORP            
                                                            ONE            11,786                  08/20/12   11/29/12    A-1 CONSTRUCTION & RENOVATION INC   
 
12-1195   Reconstruction               0-002-027  06/11/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0027   Reconstruction               0-002-028  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0792   Reconstruction               0-002-029  12/16/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1092   Reconstruction               0-002-030  04/22/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One              -700                  01/15/16   01/28/16    Patriot Organization, Inc.          
                                                            One             3,000                  01/15/16   01/28/16    Xtraire, Inc.                       
 
14-1492   Reconstruction               0-002-031  06/11/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1335   Reconstruction               0-002-032  03/10/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              94,025                  09/30/19     /  /      ACL CONSTRUCTION CORP.              
 
17-1339   Reconstruction               0-002-033  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1421   Reconstruction               0-002-034  06/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,800                  01/30/19   07/15/19    THE LANDTEK GROUP, INC.             
 
17-1258   Reconstruction               0-002-035  04/13/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0589   Reconstruction               0-002-036  11/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -16,500                  08/05/20   10/06/20    THERNO TECH COMBUSTION              
                                                            1              -2,755                  10/14/22   05/16/23    Haugland Energy Group LLC           
 
18-0919   Reconstruction               0-002-037  01/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1727   Reconstruction               0-002-038  07/08/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1018   Reconstruction               0-002-039  05/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0562   Reconstruction               0-002-040  02/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1474   Reconstruction               0-002-041  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0406   Visual Structural Inspection 0-002-SC1  11/16/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1582SC Visual Structural Inspection 0-002-SC2  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Alleghany Ave. Elementary:
90-1093   Reconstruction               0-004-003  04/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1604   Reconstruction               0-004-004  06/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1455   Reconstruction               0-004-006  06/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0685   Additions and Alterations    0-004-007  03/19/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-PL           -4,600                  04/17/03   05/05/03    Manning Plumbing                    
 
98-0958   Reconstruction               0-004-009  05/25/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6              13,335                  05/07/02   05/23/02    JP Daly and Sons                    
 
00-1393   Reconstruction               0-004-010  10/03/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0018   Reconstruction               0-004-011  07/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0328   Reconstruction               0-004-012  11/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,000                  11/23/05   11/25/05    EBC Co                              
                                                            1              -2,671                  06/29/06   10/02/06    KEM Construction                    
 
04-0512   Reconstruction               0-004-013  01/26/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0924   Reconstruction               0-004-014  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0843   Reconstruction               0-004-015  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            TWO             1,812                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
 
07-0221   Reconstruction               0-004-016  12/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1023   Reconstruction               0-004-017  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0028   Reconstruction               0-004-018  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1340   Reconstruction               0-004-019  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1318   Reconstruction               0-004-020  04/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0054   Reconstruction               0-004-021  04/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -17,672                  03/29/21   05/13/21    jns heating service                 
 
19-0246   Reconstruction               0-004-022  10/03/19  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1689SC Visual Structural Inspection 0-004-SC1  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Edward Bower ES-Alt Ed:
90-1296   Reconstruction               0-005-004  05/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1246   Reconstruction               0-005-006  05/12/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0972   Reconstruction               0-005-007  04/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0959   Reconstruction               0-005-009  05/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1394   Reconstruction               0-005-010  10/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -25,415                  12/26/03   03/15/04    Whitestone Construction             
                                                            1-BR-BWR       19,020                  02/24/03   03/06/03    Rockmore Contracting                
 
03-1190   Reconstruction               0-005-012  06/25/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0513   Additions and Alterations    0-005-013  01/26/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0925   Reconstruction               0-005-014  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0844   Reconstruction               0-005-015  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FOUR            1,812                  03/21/08   08/12/08    ROLDAND'S ELECTRIC                  
 
07-0222   Reconstruction               0-005-016  12/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,500                  03/10/09   06/10/09    C & M Door Controls                 
 
07-2345   Reconstruction               0-005-017  12/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE-REV        -2,500                  12/14/09   02/04/10    C&M DOOR CONTROLS INC               
 
10-1024   Reconstruction               0-005-018  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1341   Reconstruction               0-005-019  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0055   Reconstruction               0-005-020  04/25/19  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1584SC Visual Structural Inspection 0-005-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Daniel Street Elementary:
91-0125   Reconstruction               0-006-004  09/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1456   Reconstruction               0-006-007  06/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0973   Reconstruction               0-006-008  04/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1179   Reconstruction               0-006-010  04/01/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0425   Reconstruction               0-006-011  12/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0960   Reconstruction               0-006-012  05/25/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-DS            2,000                  02/24/03   03/04/03    SJ Hoerning Const.                  
 
00-1395   Reconstruction               0-006-013  10/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-DS           14,180                  02/24/03   03/06/03    Marangos Construction               
 
01-1477   Reconstruction               0-006-014  07/23/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0107   Reconstruction               0-006-015  09/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0514   Reconstruction               0-006-016  01/26/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              46,200                  05/15/07   06/22/07    County Carpet                       
 
04-0926   Reconstruction               0-006-017  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0845   Reconstruction               0-006-018  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            THREE           1,812                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
                                                            TWO            -2,000                  03/06/09   06/25/09    C&M DOOR CONTROLS, INC.             
 
07-0223   Reconstruction               0-006-019  12/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1025   Reconstruction               0-006-020  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0771   Reconstruction               0-006-021  04/17/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0029   Reconstruction               0-006-022  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1326   Reconstruction               0-006-023  08/20/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1342   Reconstruction               0-006-024  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1211   Reconstruction               0-006-025  04/10/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0056   Reconstruction               0-006-026  04/25/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1923   Reconstruction               0-006-027  08/13/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -50,000                  09/11/23     /  /      ARROW STEEL WINDOWS                 
 
08-1687SC Visual Structural Inspection 0-006-SC1  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          William Rall Elementary:
90-1297   Reconstruction               0-007-003  05/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0126   Reconstruction               0-007-005  09/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0974   Reconstruction               0-007-007  04/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0559   Additions and Alterations    0-007-008  04/03/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,500                  08/21/01   02/06/02    Air Design                          
                                                            1              18,078                  07/25/06   08/01/06    AM Construction Enterprises         
                                                            2               3,920                  08/21/01   02/06/02    Air Design                          
                                                            3               2,790                  08/21/01   02/06/02    Air Design                          
                                                            3               8,000                  10/22/01   04/15/02    Manning Plumbing                    
 
98-0961   Reconstruction               0-007-010  05/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1396   Reconstruction               0-007-011  10/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            !-WR           11,982                  02/24/03   03/06/03    Marangos Construction               
 
02-0122   Reconstruction               0-007-012  10/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0515   Reconstruction               0-007-013  01/26/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0927   Reconstruction               0-007-014  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0846   Reconstruction               0-007-015  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EIGHT           5,150                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
                                                            THREE          -3,648                  03/06/09   06/25/09    C&M DOOR CONTROLS INC.              
 
07-0224   Reconstruction               0-007-016  12/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1026   Reconstruction               0-007-017  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0030   Reconstruction               0-007-018  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1755   Reconstruction               0-007-019  11/02/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1343   Reconstruction               0-007-020  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1319   Reconstruction               0-007-021  04/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0057   Reconstruction               0-007-022  04/25/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
90-1094   Reconstruction               0-009-003  04/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1605   Reconstruction               0-009-005  06/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1457   Reconstruction               0-009-006  06/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0975   Reconstruction               0-009-007  04/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1465   Reconstruction               0-009-009  06/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0558   Additions and Alterations    0-009-011  04/03/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -256                  03/15/02   04/19/02    Roland's Electric                   
                                                            1             -51,189                  04/30/03   02/21/06    Suburban Restoration Co., Inc.      
                                                            10             34,035                  07/10/01   01/15/02    Rockmore Contracting                
                                                            10              1,500                  10/23/01   01/08/02    Roland's Electric                   
                                                            11              9,916                  07/10/01   01/15/02    Rockmore Contracting                
                                                            12             39,138                  07/10/01   01/15/02    Rockmore Contracting                
                                                            13                898                  07/10/01   01/15/02    Rockmore Contracting                
                                                            14              4,267                  07/10/01   01/15/02    Rockmore Contracting                
                                                            15             13,166                  07/10/01   01/15/02    Rockmore Contracting                
                                                            16             74,961                  07/10/01   01/15/02    Rockmore Contracting                
                                                            17              6,801                  08/21/01   01/09/02    Rockmore Contracting                
                                                            18             45,982                  08/21/01   01/09/02    Rockmore Contracting                
                                                            2              -1,667                  07/10/01   01/28/02    Air Design                          
                                                            2               2,414                  05/25/01   05/27/03    Rockmore Contracting                
                                                            21             -3,250                  08/26/02   09/03/02    Roland's Electric                   
                                                            22-EL           2,404                  02/12/04   03/04/04    Roland's Electric                   
                                                            23-EL             935                  03/20/03   03/28/03    Roland's Electric                   
                                                            24-EL           3,509                  03/20/03   03/28/03    Roland's Electric                   
                                                            3              12,017                  07/10/01   01/28/02    Landtek Group                       
                                                            3              -2,710                  01/10/01   01/14/03    Air Design                          
                                                            4                 534                  07/10/01   01/15/02    Rockmore Contracting                
                                                            4              -4,420                  07/08/02   07/12/02    Air Design                          
                                                            5               2,488                  07/10/01   01/15/02    Rockmore Contracting                
                                                            5               4,500                  01/10/01     /  /      Roland's Electric                   
                                                            6               6,677                  07/10/01   01/15/02    Rockmore Contracting                
                                                            6               9,989                  07/10/01   01/28/02    Roland's Electric                   
                                                            6                -891                  09/04/01   04/12/02    Manning Plumbing                    
                                                            7              73,000                  07/10/01   01/15/02    Rockmore Contracting                
                                                            7               1,027                  07/10/01   01/28/02    Roland's Electric                   
                                                            8              15,500                  07/10/01   01/15/02    Rockmore Contracting                
                                                            8-EL           -6,329                  03/20/03   03/28/03    Roland's Electric                   
                                                            8-PL           -3,995                  04/17/03   05/01/03    Manning Plumbing                    
                                                            9               9,715                  07/10/01   01/15/02    Rockmore Contracting                
                                                            9-Pl           -8,510                  04/17/03   02/21/06    Manning Plumbing                    
                                                            MECH 5           -450                  05/19/04   05/27/04    Air Design                          
 
99-1230   Reconstruction               0-009-012  06/29/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1559   Reconstruction               0-009-013  10/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-Ir            5,378                  02/24/03   03/06/03    Rockmore Contracting                
                                                            1-SW           26,340                  02/24/03   03/06/03    The Landtek Group                   
                                                            2-SW           10,625                  02/12/04   03/03/04    The Landtek Group                   
                                                            3-SW            4,200                  02/12/04   03/03/04    The Landtek Group                   
 
02-0016   Reconstruction               0-009-014  07/19/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,425                  06/17/03   06/26/03    Ultimate Power                      
 
02-1248   Reconstruction               0-009-015  08/29/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL-001          4,035                  01/28/05   09/22/06    Palace Electrical                   
                                                            EL-002          3,184                  01/28/05   02/11/05    Palace Electrical Contractors       
                                                            EL-003           -500                  03/12/06   09/22/06    Palace Electrical                   
 
02-0904   Reconstruction               0-009-016  01/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00016          14,317                  04/27/05   08/03/05    Christa Construction                
 
03-0270   Reconstruction               0-009-017  11/03/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             181,500                  03/21/05   04/15/05    Annex General Contracting           
                                                            1               5,500                  03/09/06   03/13/06    Annex General Contracting, Inc.     
 
04-0208   Reconstruction               0-009-018  10/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,500                  06/21/05   06/27/05    Hawkeye                             
                                                            2               1,900                  05/15/07   06/22/07    County Carpet                       
 
04-0928   Reconstruction               0-009-019  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0516   Reconstruction               0-009-020  01/26/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             255,913                  11/24/06   01/12/07    Stasi Brothers                      
                                                            2             -10,000                  06/25/07   07/17/07    Stasi Brothers                      
 
06-0847   Reconstruction               0-009-021  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            SIX             1,687                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
                                                            Three         -10,000                  08/18/08   07/08/09    THERMO TECH COMBUSTION              
 
07-0225   Reconstruction               0-009-022  12/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0745   Reconstruction               0-009-023  11/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -4,000                  08/19/08   10/21/08    VEZANDIO CONTRACTIONG CORP.         
 
07-1204   Reconstruction               0-009-024  01/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             4,885                  01/15/10   03/30/10    J. BARWICK LANDSCAPE & SITE         
 
07-2218   Reconstruction               0-009-025  08/21/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0266   Reconstruction               0-009-026  10/07/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -7,312                  11/15/10   11/22/10    FERRANDINO & SON ENVIRON            
 
10-1027   Reconstruction               0-009-027  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0601   Reconstruction               0-009-028  04/12/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1052   Reconstruction               0-009-029  06/04/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0031   Reconstruction               0-009-031  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1060   Reconstruction               0-009-032  07/11/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1266   Reconstruction               0-009-033  04/29/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0050   Reconstruction               0-009-034  02/19/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1093   Reconstruction               0-009-035  04/22/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            14,527                  02/12/16   04/18/16    Marfi Contracting Corp.             
 
15-0678   Reconstruction               0-009-037  04/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -1,499                  11/25/16   12/27/16    JNH Construction Group, Inc.        
 
15-2029   Reconstruction               0-009-038  12/23/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1344   Reconstruction               0-009-039  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1235   Reconstruction               0-009-040  03/14/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1028   Reconstruction               0-009-041  04/24/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0549   Reconstruction               0-009-042  02/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              31,683                  05/01/23     /  /      JNH CONSTRUCTION GROUP              
                                                            1              -4,000                  05/01/23     /  /      DOMINION CONSTRUCTION CORP          
                                                            1             -10,000                  08/09/23   12/29/23    W.H.M. PLUMBING AND HEATING         
                                                            2               2,880                  08/09/23   12/29/23    DOMINION CONST                      
 
21-0563   Reconstruction               0-009-043  02/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1475   Reconstruction               0-009-044  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1605   Reconstruction               0-009-045  07/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1511SC Visual Structural Inspection 0-009-SC1  05/04/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1586SC Visual Structural Inspection 0-009-SC2  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Gates Elementary:
90-1095   Reconstruction               0-010-003  04/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0976   Reconstruction               0-010-004  04/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0962   Reconstruction               0-010-006  05/25/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-WG            2,000                  02/24/03   03/06/03    SJ Hoerning Const.                  
 
00-1397   Reconstruction               0-010-007  10/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-IR-WG        21,790                  02/24/03   03/06/03    Rockmore Contracting                
 
04-0517   Reconstruction               0-010-008  01/26/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             9,483                  01/23/08   04/04/08    STASI BROTHERS ASPHALT              
 
04-0929   Reconstruction               0-010-009  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0848   Reconstruction               0-010-010  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            NINE            1,812                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
                                                            ONE             4,025                  07/14/08   05/11/09    THERMO TECH COMBUSTION              
 
07-0226   Reconstruction               0-010-011  12/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1428   Reconstruction               0-010-012  06/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1028   Reconstruction               0-010-013  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1345   Reconstruction               0-010-014  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1320   Reconstruction               0-010-015  04/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0058   Reconstruction               0-010-016  04/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,563                  03/29/21   05/12/21    LEB ELECTRIC LTD.                   
 
18-1844   Reconstruction               0-010-017  05/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,800                  01/24/20   03/10/20    RENU CONTRACTING                    
 
07-1581SC Visual Structural Inspection 0-010-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Harding Elementary School:
93-0977   Reconstruction               0-011-005  04/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0963   Reconstruction               0-011-007  05/25/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-HAR           2,000                  02/24/03   03/04/03    SJ Hoerning Const.                  
 
00-1398   Reconstruction               0-011-008  10/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-IR-HAR       12,151                  02/24/03   03/06/03    Rockmore Contracting                
 
02-0072   Reconstruction               0-011-009  01/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0405   Reconstruction               0-011-010  10/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1191   Reconstruction               0-011-011  06/26/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0518   Reconstruction               0-011-012  01/26/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              45,492                  01/02/07   01/30/07    J Anthony Enterprises               
                                                            2              19,100                  02/23/07   03/14/07    J Anthony Enterprises               
 
04-0930   Reconstruction               0-011-013  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0849   Reconstruction               0-011-014  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FIVE            1,812                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
                                                            TWO            -5,250                  07/14/08   05/11/09    THERMO TECH COMBUSTION              
 
07-0227   Reconstruction               0-011-015  12/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1029   Reconstruction               0-011-016  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1325   Reconstruction               0-011-017  05/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -3,800                  04/20/15   05/11/15    Arrow Steel Windows                 
 
14-1094   Reconstruction               0-011-018  04/21/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One           -10,301                  01/15/16   01/28/16    GTS Construction Corp.              
 
17-1346   Reconstruction               0-011-019  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1249   Reconstruction               0-011-020  04/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,929                  12/13/19   01/03/20    ARROW STEEL WINDOW CORP.            
 
18-0059   Reconstruction               0-011-021  04/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -20,000                  10/14/22   05/16/23    Haugland Energy Group LLC           
 
07-1579SC Visual Structural Inspection 0-011-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Albany Avenue Elementary School:
90-1298   Reconstruction               0-012-003  05/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0127   Reconstruction               0-012-004  09/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0978   Reconstruction               0-012-005  04/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0964   Reconstruction               0-012-007  05/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1399   Reconstruction               0-012-008  10/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-ALB          13,131                  02/24/03   03/06/03    Marangos Construction               
 
02-0017   Reconstruction               0-012-009  07/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0519   Additions and Alterations    0-012-011  01/26/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0931   Reconstruction               0-012-012  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0850   Reconstruction               0-012-013  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FOUR           -1,800                  03/09/09   06/17/09    C&M DOOR CONTROLS, INC.             
                                                            ONE             2,142                  03/21/08   08/12/08    ROLAND'S ELECTRIC                   
 
07-0228   Reconstruction               0-012-014  12/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1030   Reconstruction               0-012-016  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0032   Reconstruction               0-012-017  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1061   Reconstruction               0-012-018  07/11/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1347   Reconstruction               0-012-019  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1321   Reconstruction               0-012-020  04/19/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0060   Reconstruction               0-012-021  04/25/19  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1583SC Visual Structural Inspection 0-012-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXNiagara Ave. Sch & Admin.See1-013:
90-1299   Reconstruction               0-013-003  05/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0520   Reconstruction               0-013-005  01/26/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0932   Reconstruction               0-013-006  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0851   Reconstruction               0-013-007  06/01/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1031   Reconstruction               0-013-008  09/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0264   Reconstruction               0-013-009  03/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            One            -2,981                  03/07/14   05/05/14    LEB Electric, LTD.                  
 

          MA McKenna (formerly Niagara Admin):
13-0033   Reconstruction               1-013-002  08/22/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1034   Reconstruction               1-013-003  03/23/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1348   Reconstruction               1-013-004  06/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0927   Reconstruction               1-013-005  05/10/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              37,002                  02/17/22   04/05/23    Arrow Steel Window Corp             
                                                            2             -17,500                  09/12/22   08/22/23    Arrow Steel Window Corp             
 
08-1688SC Visual Structural Inspection 1-013-SC1  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          XX Inter-Modal Shipping Container #1:
09-0034   Reconstruction               2-021-001  02/13/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXGrounds Department Shop Demolition:
19-0614   Reconstruction               2-029-002  02/13/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lindenhurst Maintenance Building:
19-0615   New Construction             3-039-001  02/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,530                  09/20/21   12/01/22    J-Cole Construction Consultants     
                                                            2              30,000                  11/01/21   12/07/22    J-Cole Const Consultants            
 

          Lindenhurst Memorial Library:
94-1367   Reconstruction               6-003-002  03/23/95  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0469   Reconstruction               6-003-003  01/10/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1622   Reconstruction               6-003-004  09/18/14  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0936   Additions and Alterations    6-003-006  03/01/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -160                  09/12/23   12/28/23    HARTCORN PLUMBING                   
                                                            10             88,089                  11/28/22     /  /      Renu Contr&Restore Inc              
                                                            11              6,592                  07/14/22   05/09/23    Renu Contr&Restore Inc              
                                                            12              5,861                  07/14/22     /  /      Renu Contrg&Restore Inc             
                                                            13             26,440                  11/28/22   12/13/23    Renu Contr&Restore Inc              
                                                            14R            53,264                  05/10/23   12/22/23    RENU CONTRACTING & RESTORATION      
                                                            14R            53,264                  06/20/23   12/18/23    RENU CONTRACTING                    
                                                            15            200,532           6,323  09/12/23   12/18/23    RENU CONTRACTIN & RESTORATION INC   
                                                            1A             31,382                  05/06/22   05/22/23    Renu Contrg&Restore Inc             
                                                            1R             31,382                  05/06/22     /  /      Renu Contr&Restore Inc              
                                                            2               9,083                  05/06/22   05/22/23    Renu Contr&Restore                  
                                                            3              75,000                  07/14/22   03/28/23    Cooper Power&Light Corp             
                                                            3             -12,814                  03/20/23   12/19/23    KG MECHANICAL,INC                   
                                                            4               5,888                  05/06/22   05/22/23    Renu Contr&Restore Inc              
                                                            5               6,955                  05/06/22   05/22/23    Renu Contr&Restore Inc              
                                                            6               6,271                  05/06/22     /  /      Renu Contr&Restore Inc              
                                                            7               5,533                  06/21/22   05/16/23    Renu Contrc & Restorg Inc           
                                                            8               2,408                  07/14/22     /  /      Renu Contr&Restore Inc              
 
20-0966   Reconstruction               6-003-007  05/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,765                  11/15/22   07/25/23    ELDOR CONTRACTING CORP              
 

          Toilet Facility:
99-0959   New Construction             7-018-001  05/12/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-MS          114,169                  02/24/03   03/13/03    Rockmore Contracting                
 

          Press Box @ Middle School:
99-1531   New Construction             7-020-001  06/02/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
08-1640   Reconstruction               7-999-001  05/19/09  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1516   Reconstruction               7-999-002  07/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE

COPIAGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-05-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Deauville Gardens Elementary:
90-1157   Reconstruction               0-001-010  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1216   Reconstruction               0-001-011  03/15/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1605   Reconstruction               0-001-012  06/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1054   Additions and Alterations    0-001-013  05/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0159   Reconstruction               0-001-014  12/11/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              36,800                  10/05/01   02/08/02    Thomas Novelli Contracting          
 
01-0584   Reconstruction               0-001-015  04/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1107   Reconstruction               0-001-016  06/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1470   Reconstruction               0-001-017  07/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0259   Reconstruction               0-001-018  03/29/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1542   Reconstruction               0-001-019  11/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0135   Additions and Alterations    0-001-020  01/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            BIS 002         3,004                  12/27/17   01/26/18    192 Branch Interior Services, Inc.  
                                                            BIS 003        15,741                  02/22/18   02/28/18    192 Branch Interior Services, Inc.  
                                                            BIS 004         2,810                  02/22/18   02/28/18    192 Branch Interior Services, Inc.  
                                                            BIS-006        68,206                  08/23/18   09/20/18    192 BRANCH INTERIOR SERVICES INC    
                                                            BIS007         31,085                  09/14/18   10/22/18    192 BRANCH INTERIOR SERVICES        
                                                            COBIS001       16,007                  10/19/17   11/21/17    192 Branch Interior Services, Inc.  
                                                            COBIS005        1,420                  12/06/18   01/23/19    192 BRANCH INTERIOR SERVICES, INC.  
                                                            COMPI001            0                  09/27/17   10/10/17    Turner Construction Company         
                                                            COMPI002       -1,125                  10/19/17   11/27/17    Maccarone Plumbing, Inc.            
                                                            COMPI003            0                  09/27/17   10/10/17    Turner Construction Company         
                                                            COMPI004            0                  09/27/17   10/10/17    Turner Construction Company         
                                                            COMPI005            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            COMPI006            0                  11/27/17   06/01/18    Turner Construction Company         
                                                            COMPI008       21,136                  11/27/17   06/01/18    Maccarone Plumbing, Inc.            
                                                            COMPI010      180,549                  01/24/18   04/11/18    Maccarone Plumbing, Inc.            
                                                            COMPI011        2,141                  05/07/18   06/04/18    Maccarone Plumbing, Inc.            
                                                            COPEC001            0                  09/27/17   10/10/17    Turner Construction Company         
                                                            COPEC002            0                  09/27/17   10/10/17    Turner Construction Company         
                                                            COPEC011            0                  12/06/18   01/24/19    TURNER CONSTRUCTION CO.             
                                                            COPEC013            0                  08/23/18   11/30/18    TURNER CONSTRUCTION COMPANY         
                                                            COPEC028       -8,058                  12/06/18   01/22/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            COSCI001            0                  09/27/17   10/10/17    Turner Construction Company         
                                                            COSCI002      -18,800                  11/27/17   02/14/18    Stalco Construction, Inc.           
                                                            COSCI010            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COSCI010            0                  01/31/18   02/21/18    Turner Construction Company         
                                                            COSCI011      -66,142                  04/05/18   04/12/18    Stalco Construction, Inc.           
                                                            COSCI012            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COSCI012            0                  01/31/18   02/21/18    Turner Construction Company         
                                                            COSCI013            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COSCI013            0                  01/31/18   02/21/18    Turner Construction Company         
                                                            COSCI014            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COSCI014            0                  01/31/18   02/21/18    Turner Construction Company         
                                                            COSCI015            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COSCI015            0                  01/31/18   02/21/18    Turner Construction Company         
                                                            COSCI016            0                  01/30/18   02/21/18    Turner Construction Company         
                                                            COSCI017            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI018            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI019            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI020            0                  05/07/18   06/04/18    Turner Construction Company         
                                                            COSCI021            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI022            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI023            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI024            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI025            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI026            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI027            0                  04/05/18   04/12/18    Turner Construction Company         
                                                            COSCI028            0                  05/07/18   06/01/18    Turner Construction Company         
                                                            COSCI029            0                  05/07/18   06/01/18    Turner Construction Company         
                                                            COSCI030            0                  05/07/18   06/01/18    Turner Construction Company         
                                                            COSCI031            0                  05/07/18   06/01/18    Turner Construction Company         
                                                            COSCI032            0                  05/07/18   06/01/18    Turner Construction Company         
                                                            COSCI033            0                  05/07/18   06/01/18    Turner Construction Company         
                                                            COSCI034            0                  05/07/18   06/01/18    Turner Construction Company         
                                                            MPI 009          -900                  12/27/17   01/23/18    Maccarone Plumbing, Inc.            
                                                            MPI 014        15,094                  08/23/18   09/24/18    MACCARONE PLUMBING INC              
                                                            MPI-015         9,000                  01/09/19   02/04/19    MACCARONE PLUMBING, INC.            
                                                            MPI007         22,724                  05/25/18   06/18/18    MACCARONE PLUMBING, INC.            
                                                            MPI012        -12,600                  05/25/18   06/18/18    MACCARONE PLUMBING, INC.            
                                                            MPI013          3,504                  06/14/18   07/26/18    MACCARONE PLUMBING INC              
                                                            PEC 015         1,841                  10/04/18   10/25/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC-006             0                  01/09/19   02/01/19    PALACE ELECTRICAL CONTRACTOR        
                                                            PEC-007             0                  08/06/18   01/07/19    PALACE ELECTRICAL CONTRACTOR, INC.  
                                                            PEC-008             0                  08/06/18   01/07/19    PALACE ELECTRICAL CONTRACTOR, INC.  
                                                            PEC-009             0                  08/06/18   01/07/19    PALACE ELECTRICAL CONTRACTOR, INC.  
                                                            PEC-010             0                  08/06/18   01/07/19    PALACE ELECTRICAL CONTRACTOR, INC.  
                                                            PEC-011             0                  08/06/18   01/07/19    PALACE ELECTRICAL CONTRACTOR, INC.  
                                                            PEC-012             0                  08/06/18   01/07/19    PALACE ELECTRICAL CONTRACTOR, INC.  
                                                            PEC-016        50,404                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRSCTING, INC. 
                                                            PEC-017        27,634                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-018         6,118                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-020         3,081                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-021         6,265                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-022         2,676                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-023         4,123                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-024         4,536                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-025         8,154                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-026         6,210                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-027         4,347                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC003              0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            PEC004              0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            PEC005              0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            PEC014         20,179                  10/04/18   10/25/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC019          5,220                  01/22/19   02/12/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            SCI 004             0                  12/27/17   01/26/18    Turner Construction Company         
                                                            SCI 005             0                  12/27/17   01/26/18    Turner Construction Company         
                                                            SCI 006             0                  12/27/17   01/26/18    Turner Construction Company         
                                                            SCI 007             0                  12/27/17   01/26/18    Turner Construction Company         
                                                            SCI 008             0                  12/27/17   01/26/18    Turner Construction Company         
                                                            SCI 009             0                  12/27/17   01/26/18    Turner Construction Company         
                                                            SCI 039       214,086                  05/25/18   06/11/18    STALCO CONSTRUCTION, INC.           
                                                            SCI-050         1,976                  08/06/18   08/15/18    STALCO CONSTRUCTION INC             
                                                            SCI-051        -3,004                  08/06/18   08/15/18    STALCO CONSTRUCTION INC             
                                                            SCI-052         1,413                  08/06/18   08/15/18    STALCO CONSTRUCTION INC             
                                                            SCI-053        -2,586                  08/06/18   08/15/18    STALCO CONSTRUCTION INC             
                                                            SCI-054       -10,371                  08/06/18   08/15/18    STALCO CONSTRUCTION INC             
                                                            SCI-055         2,473                  08/06/18   08/15/18    STALCO CONSTRUCTION INC             
                                                            SCI-056         4,523                  08/23/18   09/20/18    STALCO CONSTRUCTION INC             
                                                            SCI-057           441                  08/23/18   09/20/18    STALCO CONSTRUCTION INC             
                                                            SCI-058          -429                  08/23/18   09/20/18    STALCO CONSTRUCTION INC             
                                                            SCI-059         3,004                  08/23/18   09/20/18    STALCO CONSTRUCTION INC             
                                                            SCI-066         1,478                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-067           900                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-068         1,430                  10/04/18   10/26/18    STALCO CONSTRUCTION INC             
                                                            SCI-069         1,903                  10/04/18   10/29/18    STALCO CONSTRUCTION  INC            
                                                            SCI-070         1,353                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-071         7,723                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-072         1,800                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-073         6,150                  10/04/18   10/29/18    STALCO CONSTUCTION INC              
                                                            SCI-074         2,425                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-075         7,442                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-076        16,618                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-077         3,775                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-078         5,578                  10/04/18   10/29/18    STALCO CONSTRUCTION INC             
                                                            SCI-079        21,838                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-080         7,210                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-081         4,989                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-082         3,563                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-083         2,376                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-084         3,326                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-085         3,413                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-086         6,621                  11/07/18   01/07/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-087         1,576                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-088         2,926                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-089         6,077                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-090        -2,249                  11/07/18   01/07/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-091         7,699                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-092         3,563                  11/07/18   01/07/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-093         1,692                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-094         1,440                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-095         6,924                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-096         6,921                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-097        -1,949                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-098         7,029                  11/07/18   01/03/19    STALCO CONTRUCTION, INC.            
                                                            SCI-099       -15,179                  11/07/18   01/03/19    STALCO CONSTRUCTION, INC.           
                                                            SCI-101        -1,268                  11/28/18   01/07/19    STALCO CONSTRUCTION, INC.           
                                                            SCI035              0                  05/25/18   06/11/18    TURNER CONSTRUCTION COMPANY         
                                                            SCI036              0                  05/25/18   06/11/18    TURNER CONSTRUCTION COMPANY         
                                                            SCI037              0                  05/25/18   06/11/18    TURNER CONSTRUCTION COMPANY         
                                                            SCI038              0                  05/25/18   06/11/18    TURNER CONSTRUCTION COMPANY         
                                                            SCI040        -22,288                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI041          2,475                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI042          1,212                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI043          2,079                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI044         18,005                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI045         -1,579                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI046         19,596                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI047          4,612                  06/14/18   07/24/18    STALCO CONSTRUCTION IN              
                                                            SCI048            938                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI049           -800                  06/14/18   07/24/18    STALCO CONSTRUCTION INC             
                                                            SCI060         22,299                  09/14/18   09/25/18    STALCO CONSTRUCTION                 
                                                            SCI061            925                  09/14/18   09/25/18    STALCO CONSTRUCTION                 
                                                            SCI062          4,288                  09/14/18   09/25/18    STALCO CONSTRUCTION                 
                                                            SCI063         17,181                  09/14/18   09/25/18    STALCO CONSTRUCTION                 
                                                            SCI064          6,846                  09/14/18   09/25/18    STALCO CONSTRUCTION                 
                                                            SCI065            748                  09/14/18   09/25/18    STALCO CONSTRUCTION                 
                                                            UPI-001             0                  10/19/17   11/27/17    Ultimate Power, Inc.                
                                                            UPI-002             0                  09/27/17   10/10/17    Turner Construction Company         
                                                            UPI-003          -429                  12/27/17   01/23/18    Ultimate Power, Inc.                
                                                            UPI-004             0                  10/04/18   10/29/18    TURNER CONSTRUCTION COMPANY         
                                                            UPI-005             0                  10/04/18   10/29/18    TURNER CONSTRUCTION COMPANY         
                                                            UPI-006             0                  10/04/18   10/26/18    TURNER CONSTRUCTION COMPANY         
                                                            UPI-007             0                  10/04/18   10/26/18    TURNER CONSTRUCTION COMPANY         
                                                            UPI-008             0                  10/04/18   10/29/18    TURNER CONSTRUCTION COMPANY         
                                                            UPI-010        24,411                  03/18/19   03/19/19    ULTIMATE POWER, INC.                
 
21-0065   Reconstruction               0-001-021  08/18/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1818   Reconstruction               0-001-022  06/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1221FP Reconstruction               0-001-FP1  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1631SC Visual Structural Inspection 0-001-SC1  06/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Great Neck Rd. Elementary:
90-1158   Reconstruction               0-002-007  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1508   Reconstruction               0-002-008  08/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1055   Reconstruction               0-002-009  05/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0160   Reconstruction               0-002-010  12/11/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              38,081                  10/05/01   02/08/02    Stasi Bros. Asphalt                 
 
01-0585   Reconstruction               0-002-011  04/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1108   Reconstruction               0-002-012  06/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1471   Reconstruction               0-002-013  07/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0260   Reconstruction               0-002-014  03/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              49,700          49,700  09/13/04   10/28/04    Stasi Brothers Asphalt              
                                                            1               2,857                  09/13/04   10/25/04    Stalco Const.                       
 
06-0619   Reconstruction               0-002-016  02/13/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            16,015                  10/01/07   10/23/07    PAZA CONSTRUCTION                   
                                                            ONE            -6,125                  04/11/08   04/18/08    TROPIC ROOFING CORP.                
 
06-1543   Reconstruction               0-002-017  11/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -10,000                  11/09/09   12/28/09    HI-LUME CORPORATION                 
                                                            ONE            -7,500                  11/09/09   12/28/09    HI-LUME CORPORATION                 
 
09-1366   Reconstruction               0-002-018  05/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            THREE          25,200                  06/16/11   07/21/11    ARCHITECTURAL WINDOW MFG            
                                                            TWO            14,926                  04/11/11   05/10/11    ARCHITECTURAL WINDOW MANUFACTURING  
 
16-0118   Reconstruction               0-002-019  01/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            BIS012          6,389                  06/14/18   07/26/18    192 BRANCH INTERIOR SERVICES INC    
                                                            COACS010            0                  01/30/18   05/17/19    Turner Construction Company         
                                                            COBIS002       -3,000                  10/19/17   10/24/17    192 Brach Interior Services, Inc.   
                                                            COBIS003            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            COBIS007            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COMPI001            0                  09/27/17   10/10/17    Turner Construction Company         
                                                            COMPI004            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COMPI005            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COMPI007        6,688                  11/27/17   06/01/18    Maccarone Plumbing, Inc.            
                                                            COMPI008            0                  11/27/17   06/01/18    Turner Construction Company         
                                                            COMPI009        8,027                  11/27/17   06/01/18    Maccarone Plumbing, Inc.            
                                                            COMPI010        5,564                  11/27/17   06/01/18    Maccarone Plumbing, Inc.            
                                                            CORCR005         -985                  10/19/17   10/24/17    Renu Contracting & Restoration, Inc 
                                                            CORCR022            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            CORCR023            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            CORCR024            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            CORCR030            0                  11/27/17   02/14/18    Turner Construction Company         
                                                            CORCR035            0                  11/27/17   02/13/18    Turner Construction Company         
                                                            CORCR036            0                  01/24/18   11/25/19    Wendel Companies                    
                                                            CORCR038            0                  01/24/18   02/13/18    Wendel Companies                    
                                                            PEC 026        19,780                  08/06/18   08/15/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC-035        26,313                  11/07/18   01/07/19    PALACE ELECTRICAL CONSTRACTING, INC.
                                                            PEC-041         2,530                  11/28/18   01/16/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC009              0                  05/25/18   06/18/18    TURNER CONSSTRUCTION COMPANY        
                                                            PEC010              0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            PRC024          1,502                  06/14/18   07/26/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            RCR 034             0                  12/27/17   01/26/18    Turner Construction Company         
                                                            RCR 037        -1,200                  01/24/18   02/13/18    Renu Contracting & Restoration, Inc.
                                                            RCR 042         9,585                  01/24/18   02/13/18    Renu Contracting & Restoration, Inc.
                                                            RCR 048        41,656                  01/24/18   02/13/18    Renu Contracting & Restoration, Inc.
                                                            RCR071          6,578                  06/14/18   07/24/18    RENU CONTRACTING & RESTORATION INCC 
 
22-1819   Reconstruction               0-002-020  06/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1928   Reconstruction               0-002-021  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1219FP Reconstruction               0-002-FP1  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1630SC Visual Structural Inspection 0-002-SC1  06/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Copiague Middle School:
90-1382   Reconstruction               0-004-009  06/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1056   Reconstruction               0-004-011  05/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1288   Reconstruction               0-004-012  05/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0162   Reconstruction               0-004-013  12/11/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               5,693                  09/07/01   01/08/02    Stalco Const.                       
                                                            3               4,235                  03/22/02   04/18/02    Stalco Const.                       
 
01-0586   Reconstruction               0-004-014  04/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1109   Reconstruction               0-004-015  06/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1472   Reconstruction               0-004-016  07/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0261   Additions and Alterations    0-004-017  03/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  03/27/06   06/23/06    KEM Construction                    
 
06-1544   Reconstruction               0-004-018  11/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -5,669                  01/29/09   04/03/09    PLATO CONSTRUCTION CORP.            
 
07-2000   Reconstruction               0-004-019  07/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0119   Reconstruction               0-004-022  01/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ACS017              0                  06/14/18   02/27/19    TURNER CONSTRUCTION CO.             
                                                            COACS001            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COACS002            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COACS003            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COACS005            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            COACS006            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COACS008            0                  11/27/17   06/01/18    Turner Construction Company         
                                                            COACS009            0                  11/27/17   06/01/18    Turner Construction Company         
                                                            COACS013            0                  01/30/18   06/03/19    Turner Construction Company         
                                                            COACS016            0                  01/24/18   02/13/18    Wendel Companies                    
                                                            COACS017            0                  02/22/18   02/28/18    Turner Construction Company         
                                                            COBIS004            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            COBIS005            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            COBIS006            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            COBIS010            0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            COMPI002       -5,572                  10/19/17   11/27/17    Macaarone Plumbing, Inc.            
                                                            COMPI003            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            COMPI011        2,172                  11/27/17   06/01/18    Maccarone Plumbing, Inc.            
                                                            COMPI012        1,074                  11/27/17   06/01/18    Maccarone Plumbing, Inc.            
                                                            COMPI013        4,811                  11/27/17   06/01/18    Maccarone Plumbing, Inc.            
                                                            COPEC001            0                  02/07/18   05/17/19    Palace Electrical Contractors       
                                                            COPEC001            0                  08/23/18   11/30/18    TURNER CONSTRUCTION COMPANY         
                                                            COPEC002            0                  02/07/18   04/12/18    Palace Electrical Contractors, Inc. 
                                                            COPEC003            0                  01/24/18   02/13/18    Wendel Companies                    
                                                            COPEC005            0                  02/22/18   02/28/18    Turner Construction Company         
                                                            COPEC006            0                  02/22/18   02/28/18    Turner Construction Company         
                                                            COPEC007         -630                  05/07/18   06/04/18    Palace Electrical Contracting, Inc. 
                                                            COPEC008            0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            COPEC011            0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            COPEC012            0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            COPEC014            0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMAPNY         
                                                            COPEC016            0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            CORCR002            0                  09/12/17   10/17/17    Turner Construction Company         
                                                            CORCR003      -26,296                  10/19/17   10/24/17    Renu Contracting & Restoration, Inc 
                                                            CORCR004            0                  09/12/17   10/17/17    Turner Construction Company         
                                                            CORCR009            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            CORCR010            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            CORCR011            0                  10/19/17   10/24/17    Turner Construction Company         
                                                            CORCR012            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR013            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR014            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR015            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR016            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR017            0                  10/19/17   11/27/17    Turner Construction Company         
                                                            CORCR018            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR019            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR021            0                  10/19/17   10/26/17    Turner Construction Company         
                                                            CORCR026            0                  11/27/17   02/14/18    Turner Construction Company         
                                                            CORCR027      -13,434                  11/27/17   02/14/18    Renu Contracting & Restoration, Inc.
                                                            CORCR029            0                  11/27/17   02/14/18    Turner Construction Company         
                                                            CORCR031            0                  11/27/17   02/14/18    Turner Construction Company         
                                                            CORCR032            0                  11/27/17   02/14/18    Turner Construction Company         
                                                            CORCR033       -7,200                  11/27/17   02/14/18    Renu Contracting & Restoration, Inc.
                                                            CORCR054       28,220                  04/05/18   04/12/18    Renu Contracting & Restoration, Inc 
                                                            CORCR055       -4,496                  05/25/18   06/11/18    RENU CONTRACTING & RESTORATION, INC.
                                                            MPI 013         4,258                  12/27/17   09/24/18    Maccarone Plumbing, Inc.            
                                                            MPI 014         1,427                  12/27/17   01/23/18    Maccarone Plumbing, Inc.            
                                                            MPI 018        12,384                  08/23/18   09/24/18    MACCARONE PLUMBING INC              
                                                            PEC 028         3,266                  10/04/18   10/22/18    PALACE ELECTRICAL CONSTRACTING INC  
                                                            PEC-027        12,393                  08/06/18   08/15/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC-034        56,537                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-036         2,406                  11/07/18   01/07/19    PALACE ELECTRICAL CONSTRACTING, INC.
                                                            RCR 043        16,670                  01/24/18   02/13/18    Renu Contracting & Restoration, Inc.
                                                            RCR068         25,924                  06/14/18   07/24/18    RENU CONSTRACTING & RESTORATION INC 
 
16-0120   Reconstruction               0-004-024  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            COECC001     -104,713                  10/19/17   09/24/18    Eldor Contracting Corporation       
                                                            COL11004       33,100                  12/06/18     /  /      turner contruction co.              
                                                            COLII001            0                  10/19/17   07/09/19    Turner Construction Company         
                                                            COLII001            0                  08/23/18   11/30/18    TURNER CONSTRUCTION COMPANY         
                                                            COLII002       -5,917                  10/19/17   11/10/17    Laser Industries, Inc.              
                                                            COLII003            0                  10/19/17   12/26/17    Turner Construction Company         
                                                            COLII004            0                  05/25/18   01/24/19    TURNER CONSTRUCTION COMPANY         
                                                            COLII004            0                  08/23/18   01/25/19    TURNER CONSTRUCTION COMPANY         
                                                            COLII007            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COLII008            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COLII009            0                  01/12/18   01/25/18    Turner Construction Company         
                                                            COLII011       15,000                  01/31/18   02/21/18    Laser Industries, Inc.              
                                                            COLII012       10,000                  01/31/18   02/21/18    Laser Industries, Inc.              
                                                            COLTG001            0                  10/19/17   11/10/17    Turner Construction Company         
                                                            COLTG003            0                  05/25/18   08/06/18    The LandTek Group, Inc.             
                                                            LII 005        26,123                  12/27/17   01/26/18    Laser Industries, Inc.              
                                                            LII 006        23,135                  01/12/18   01/25/18    Laser Industries, Inc.              
                                                            LII 010         3,348                  01/12/18   01/25/18    Laser Industries, Inc.              
                                                            NIGC-001        6,172                  08/23/18   11/09/18    NATIONAL INSULATION & G.C. CORP     
                                                            NIGC001             0                  10/19/17   07/09/19    Turner Construction Company         
 
20-0241   Reconstruction               0-004-025  10/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1820   Reconstruction               0-004-027  06/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1940   Reconstruction               0-004-028  12/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1929   Reconstruction               0-004-029  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1218GP Reconstruction               0-004-FP1  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1628SC Visual Structural Inspection 0-004-SC1  06/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Susan E. Wiley Elementary:
90-1159   Reconstruction               0-005-008  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1383   Reconstruction               0-005-010  06/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0582   Additions and Alterations    0-005-012  02/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1057   Reconstruction               0-005-013  05/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0387   Reconstruction               0-005-014  11/21/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0161   Reconstruction               0-005-015  12/11/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              41,200                  10/04/01   02/08/02    Arch. Window Mfg.                   
 
01-0587   Reconstruction               0-005-016  04/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,913                  04/08/03   04/17/03    AT Inc                              
 
02-1110   Reconstruction               0-005-017  06/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1473   Reconstruction               0-005-018  07/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1545   Reconstruction               0-005-019  11/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -10,000                  09/16/08   05/12/09    TINRON ENTERPRISES, INC.            
 
09-1367   Reconstruction               0-005-020  05/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FOUR           -5,000                  02/27/12   08/31/12    HI-LUME CORP                        
                                                            ONE             2,620                  03/17/11   04/08/11    ARCHITECTURAL WINDOW MANUFACTURING  
 
16-0121   Reconstruction               0-005-021  01/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ACS 019        -5,362                  10/04/18   10/11/18    ACS SYSTEM ASSOCIATES INC           
                                                            ACS-028         5,300                  01/09/19   02/04/19    ACS SYSTEM ASSOCIATES, INC.         
                                                            BIS-017        14,482                  08/23/18   09/20/18    192 BRANCH INTERIOR SERVICES INC    
                                                            BIS014         13,918                  06/14/18   07/26/18    192 BRANCH INTERIOR SERVICES INC    
                                                            BIS019         13,022                  09/14/18   10/22/18    192 BRANCH INTERIOR SERVICES        
                                                            CORCR006       -5,329                  10/19/17   11/21/17    Renu Contracting & Restoration, Inc 
                                                            CORCR063       20,298                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc 
                                                            CORCR064      -15,533                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc 
                                                            MPI-022        30,344                  01/09/19   02/11/19    MACCARONE PLUMBING, INC.            
                                                            MPI-023        -4,897                  01/09/19   02/01/19    MACCARONE PLUMBING, INC.            
                                                            PEC 033         4,489                  10/04/18   10/22/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC-031        17,428                  10/04/18   10/25/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC-037         2,263                  11/07/18   01/07/19    PALACE ELETRICAL CONSTRACTING, INC. 
                                                            PEC-040         1,050                  11/28/18   01/16/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-044         2,655                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-045         1,458                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-046        13,277                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-049         3,022                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC022         13,100                  06/14/18   07/26/18    PALACE ELECTRICAL CONTRACTORS INC   
                                                            RCR 075        11,971                  08/06/18   08/15/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR 077         3,133                  08/06/18   08/15/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-080         1,613                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-083         1,696                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-086        36,318                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR093          1,910                  09/20/18   09/25/18    RENU CONTRACTING & RESTORATION      
                                                            RCR095          1,285                  09/14/18   09/25/18    RENU CONTRACTING & RESTORATION      
 
21-0066   Reconstruction               0-005-023  08/18/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1821   Reconstruction               0-005-024  06/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2445   Additions and Alterations    0-005-026  10/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1220FP Reconstruction               0-005-FP1  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1629SC Visual Structural Inspection 0-005-SC1  06/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Walter G. O'Connell High School:
90-1160   Reconstruction               0-006-006  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0993   Reconstruction               0-006-008  06/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1417   Reconstruction               0-006-009  05/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0946   Reconstruction               0-006-010  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1058   Reconstruction               0-006-011  05/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0588   Reconstruction               0-006-012  04/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1111   Reconstruction               0-006-013  06/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1474   Reconstruction               0-006-014  07/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0262   Reconstruction               0-006-015  03/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,489          22,489  09/13/04   10/25/04    Rolands Elec.                       
                                                            1               6,407                  11/26/04   12/17/04    Gordon Seaman                       
                                                            1               7,416                  01/31/05   02/11/05    Hirsch Co                           
                                                            1               9,210                  03/29/05   04/15/05    Irwin Contracting Inc               
                                                            1              -3,850                  07/26/05   08/05/05    Major Systems                       
                                                            1              -5,000                  07/26/05   08/05/05    Kem Construction                    
                                                            1              -7,273                  11/15/07   01/28/08    KEM Construction                    
                                                            2               6,718                  12/16/04   12/28/04    Roland's Elec.                      
                                                            2               9,744                  01/31/05   02/11/05    E and M Hardwood Flooring           
                                                            2               4,248                  04/04/05   04/15/05    Hirsch Co                           
 
06-0620   Reconstruction               0-006-018  02/13/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           298,000                  10/01/07   10/23/07    STALCO CONSTRUCTION                 
                                                            ONE           -15,000                  09/16/08   10/21/08    BEST ROOFING OF NJ INC.             
 
07-0729   Reconstruction               0-006-019  12/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0068   Reconstruction               0-006-020  09/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -1,563                  11/24/10   12/16/10    GEMSTAR CONSTRUCTION CORP           
 
09-1368   Reconstruction               0-006-022  05/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            ONE             9,850                  06/29/11   07/27/11    HI-LUME CORP                        
                                                            ONE             9,850                  07/01/11   07/27/11    HEDLUND ELECTRICAL CORPORATION      
                                                            RCR 039         1,626                  01/24/18   02/05/18    Renu Contracting & Restoration, Inc 
                                                            THREE          -5,000                  02/27/12   08/31/12    HI-LUME CORP                        
                                                            TWO             7,800                  08/15/11   09/07/11    HI-LUME CORP                        
 
16-0122   Reconstruction               0-006-023  01/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            ACS-020       -25,107                  11/07/18   01/07/19    ACS SYSTEM ASSOCIATES               
                                                            ACS-020             0                  02/19/19   02/27/19    TURNER CONSTRUCTION COMPANY         
                                                            ACS-021             0                  08/06/18   01/07/19    ACS SYSTEM ASSOCIATES, INC.         
                                                            ACS-022        17,622                  10/04/18   10/22/18    ACS SYSTEM ASSOCIATES INC           
                                                            ACS-024         8,965                  11/28/18   01/16/19    ACS SYSTEM ASSOCIATES, INC.         
                                                            ACS-025       -25,107                  02/19/19   02/27/19    ACS SYSTEM ASSOCIATES INC           
                                                            ACS-026        -2,070                  11/28/18   01/16/19    ACS SYSTEM ASSOCIATES, INC.         
                                                            ACS-027           983                  11/28/18   01/16/19    ACS SYSTEM ASSOCIATES, INC.         
                                                            ACS018              0                  06/14/18   02/27/19    TURNER CONSTRUCTION CO.             
                                                            ACS023          3,231                  09/14/18   10/22/18    ACS SYSTEM ASSOCIATES               
                                                            ACS025              0                  02/19/19   02/27/19    TURNER CONSTRUCTION CO.             
                                                            BIS-011         5,376                  11/07/18   01/03/19    192 BRANCH INTERIOR SERVICES, INC.  
                                                            BIS-016         5,153                  08/23/18   09/20/18    192 BRANCH INTERIOR SERVICES INC    
                                                            BIS013          3,987                  06/14/18   07/26/18    192 BRANCH INTERIOR SERVICES INC    
                                                            BIS015         26,345                  06/14/18   07/26/18    192 BRANCH INTERIOR SERVICES INC    
                                                            BIS018          6,807                  09/14/18   10/22/18    192 BRANCH INTERIOR SERVICES        
                                                            COACS004            0                  10/19/17   10/30/17    Turner Construction Company         
                                                            COACS007            0                  11/27/17   06/01/18    Turner Construction Company         
                                                            COACS011            0                  01/30/18   02/21/18    Turner Construction Company         
                                                            COACS014            0                  01/30/18   05/17/19    Turner Construction Company         
                                                            COACS014            0                  10/04/18   10/26/18    TURNER CONSTRUCTION COMPANY         
                                                            COACS015            0                  01/24/18   02/13/18    Wendel Companies                    
                                                            COACS018        9,121                  12/06/18   01/23/19    TURNER CONSTRUCTION CO.             
                                                            COACS020            0                  12/06/18   01/24/19    TURNER CONSTRUCTION CO.             
                                                            COACS021        3,235                  12/06/18   01/22/19    TURNER CONSTRUCTION CO.             
                                                            COBIS001            0                  09/12/17   10/17/17    Turner Construction Company         
                                                            COBIS008            0                  10/19/17   11/21/17    Turner Construction Company         
                                                            COBIS009            0                  02/22/18   02/28/18    Turner Construction Company         
                                                            COPEC004            0                  01/24/18   02/13/18    Wendel Companies                    
                                                            COPEC032       -3,400                  12/06/18   01/22/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            COPEC051       67,181                  12/06/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            COPEC052       -4,981                  12/06/18   01/22/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            CORCR001            0                  09/12/17   10/17/17    Turner Construction Company         
                                                            CORCR007       -1,500                  10/19/17   11/21/17    Renu Contracting & Restoration, Inc 
                                                            CORCR008            0                  09/12/17   10/17/17    Turner Construction Company         
                                                            CORCR020            0                  10/19/17   11/21/17    Turner Construction Company         
                                                            CORCR025            0                  10/19/17   11/21/17    Turner Construction Company         
                                                            CORCR028            0                  11/27/17   02/14/18    Turner Construction Company         
                                                            CORCR040            0                  01/24/18   02/13/18    Turner Construction Company         
                                                            CORCR049          842                  01/24/18   02/13/18    Renu Contracting & Restoration, Inc 
                                                            CORCR050       15,559                  04/05/18   04/12/18    Renu Contracting & Restoration, Inc.
                                                            CORCR052         -947                  04/05/18   04/12/18    Renu Contracting & Restoration, Inc.
                                                            CORCR053       10,919                  04/05/18   04/12/18    Renu Contracting & Restoration, Inc 
                                                            CORCR056       19,706                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc.
                                                            CORCR057       11,600                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc.
                                                            CORCR058      -10,919                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc 
                                                            CORCR059       21,198                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc 
                                                            CORCR060        9,133                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc.
                                                            CORCR061       24,983                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc 
                                                            CORCR062        1,601                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc 
                                                            CORCR065        2,646                  05/07/18   06/01/18    Renu Contracting & Restoration, Inc 
                                                            MPI-019         1,723                  01/09/19   02/01/19    MACCARONE PLUMBING, INC.            
                                                            MPI-020         1,955                  01/09/19   02/01/19    MACCARONE PLUMBING, INC.            
                                                            MPI-021         7,650                  01/09/19   02/04/19    MACCARONE PLUMBING, INC.            
                                                            MPI015         13,099                  05/25/18   06/18/18    MACCARONE PLUMBING, INC.            
                                                            MPI016          3,067                  06/14/18   07/26/18    MACCARONE PLUMBING INC              
                                                            MPI017         10,589                  06/14/18   07/26/18    MACCARONE PLUMBING INC              
                                                            PEC 029         4,717                  10/04/18   10/22/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC 030        11,877                  10/04/18   10/22/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC-025        10,981                  11/28/18   01/16/19    PALACE ELECTRICAL CONSTRACTING, INC.
                                                            PEC-038        18,432                  11/07/18   01/07/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-039         7,367                  11/28/18   01/16/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-042         2,912                  11/28/18   01/16/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-043       -18,432                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-047         2,696                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-048        15,175                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC-050        18,050                  11/28/18   01/25/19    PALACE ELECTRICAL CONTRACTING, INC. 
                                                            PEC013              0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            PEC015              0                  05/25/18   06/18/18    TURNER CONSTRUCTION COMPANY         
                                                            PEC017         23,247                  06/18/18   07/24/18    PALACE ELECTRICAL CONTRACTING INC   
                                                            PEC018          2,070                  06/14/18   07/26/18    PALACE ELECTRICAL CONTRACTORS INC   
                                                            PEC019         19,844                  06/14/18   07/26/18    PALACE ELECTRICAL CONTRACTORS INC   
                                                            PEC020          1,062                  06/14/18   07/26/18    PALACE ELECTRICAL CONTRACTOR INC    
                                                            PEC021          2,585                  06/14/18   07/26/18    PALACE ELECTRICAL CONTRACTOR INC    
                                                            PEC023          1,399                  06/14/18   07/26/18    PALACE ELECTRICAL CONTRACTOR INC    
                                                            RCR 041         8,307                  01/24/18   02/13/18    Renu Contracting & Restoration, Inc.
                                                            RCR 044        18,009                  02/12/18   03/08/18    Renu Contracting & Restoration, Inc.
                                                            RCR 045        31,945                  02/12/18   03/08/18    Renu Contracting & Restoration, Inc.
                                                            RCR 046        31,945                  02/12/18   03/08/18    Renu Contracting & Restoration, Inc.
                                                            RCR 047        10,710                  02/12/18   03/08/18    Renu Contracting & Restoration, Inc.
                                                            RCR 049           842                  02/12/18   03/08/18    Renu Contracting & Restoration, Inc.
                                                            RCR 051        -8,000                  03/12/18   03/15/18    Renu Contracting & Restoration, Inc.
                                                            RCR 076        12,616                  08/06/18   08/15/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR 078        10,721                  08/06/18   08/15/18    RENU CONTRACTING & INC              
                                                            RCR 097        -1,250                  10/04/18   10/11/18    RENU CONTRACTING RESTORATION INC    
                                                            RCR 098         2,410                  10/04/18   10/11/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR 099         3,511                  10/04/18   10/11/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-079        -1,044                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-081         6,850                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION      
                                                            RCR-082         3,881                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION      
                                                            RCR-084           806                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-085        15,208                  08/23/18   09/20/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-100         1,927                  10/04/18   11/06/18    RENU CONTRACTING & RESTORATION INCC 
                                                            RCR-101         1,499                  10/04/18   11/06/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR-102         8,568                  11/07/18   01/03/19    RENU CONTRACTING & RESTORATION, INC 
                                                            RCR-103         4,338                  11/07/18   01/04/19    RENU CONTRACTING & RESTORATION, INC.
                                                            RCR-104       -15,208                  11/07/18   01/03/19    RENU CONTRACTING & RESTORATION, INC.
                                                            RCR066          1,713                  05/25/00   06/11/18    RENU CONTRACTING & RESTORATION, INC.
                                                            RCR067          5,605                  06/14/18   07/24/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR069         26,566                  06/14/18   07/24/18    RENU CONTRACTING & RESTORATION INC  
                                                            RCR070          1,549                  06/14/18   07/24/18    RENU CONTRACTING & RESTORATION INCC 
                                                            RCR072        129,244                  06/14/18   07/24/18    RENU CONTRACTING & RESTORATION INCC 
                                                            RCR073         64,920                  06/14/18   07/24/18    RENU CONTRACTING & RESTORATION INCC 
                                                            RCR074          3,408                  06/14/18   07/24/18    RENU CONTRACTING & RESTORATION INCC 
                                                            RCR087          2,157                  09/14/18   09/25/18    RENU CONTRACING & RESTORATION       
                                                            RCR088          5,007                  09/14/18   09/25/18    RENU CONTRACTING & RESTORATION      
                                                            RCR089         13,338                  09/14/18   09/25/18    RENU CONTRACING & RESTORATION       
                                                            RCR090          1,060                  09/14/18   09/25/18    RENU CONTRACTING & RESTORATION      
                                                            RCR091            659                  09/14/18   09/25/18    RENU CONTRACTING & RESTRATION       
                                                            RCR092          2,040                  09/14/18   09/25/18    RENU CONTRACTING & RESTORATION      
                                                            RCR094          1,660                  09/14/18   09/25/18    RENU CONTRACTING & RESTORATION      
                                                            rcr096          3,400                  09/14/18   09/25/18    Renu Contracting & Restoration      
 
16-0123   Reconstruction               0-006-027  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            COLTG004            0                  10/19/17   11/10/17    Turner Construction Company         
                                                            COLTG005            0                  10/19/17   11/10/17    Turner Construction Company         
                                                            COLTG006       -5,058                  12/06/18   03/12/19    THE LANDTEK GROUP, INC.             
                                                            COLTG007       -7,231                  12/06/18   03/12/19    THE LANDTEK GROUP, INC.             
                                                            COLTG008      -42,400                  12/06/18   03/12/19    THE LANDTEK GROUP, INC.             
                                                            ECC 002         1,776                  12/27/17   01/25/18    Eldor Contracting Corporation       
                                                            LTG-006        -5,058                  08/23/18   01/25/19    THE LANDTEK GROUP INC               
                                                            LTG-007        -7,231                  08/23/18   01/25/19    THE LANDTEK GROUP INC               
                                                            LTG-008       -42,400                  08/23/18   01/25/19    THE LANDTEK GROUP INC               
                                                            LTG002              0                  05/25/18   08/06/18    THE LANDTEK GROUP, INC.             
                                                            MPI 006          -186                  12/27/17   01/25/18    Maccarone Plumbing, Inc.            
 
22-1822   Reconstruction               0-006-029  06/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0555   Reconstruction               0-006-030  02/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1941   Reconstruction               0-006-032  12/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1930   Reconstruction               0-006-034  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0175   Reconstruction               0-006-035  11/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1217FP Reconstruction               0-006-FP1  04/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1627SC Visual Structural Inspection 0-006-SC1  06/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Garage:
03-0263   Additions and Alterations    2-003-001  03/29/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Copiague Public Library:
06-0601   Reconstruction               6-007-003  12/14/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0255   Reconstruction               6-007-004  08/30/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0857   Additions and Alterations    6-007-005  07/16/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            20,802                  04/18/11   05/10/11    E&A RESTORATION INC                 
                                                            TWO            12,895                  05/23/11     /  /      E&A RESTORATION INC                 
 
11-0069   Reconstruction               6-007-006  08/05/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0005   Reconstruction               6-007-007  08/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1183   Reconstruction               6-007-008  05/13/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            One            -3,075                  09/03/15   09/18/15    JNS Heating Service Inc.            
 
15-1193   Reconstruction               6-007-009  07/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One                 0                  12/14/16   02/14/17    Patriot Organization, Inc.          
 
17-0929   Reconstruction               6-007-010  01/02/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  07/31/19   10/03/19    A1 CONSTRUCTION SERVICE, INC.       
 
20-1805   Reconstruction               6-007-011  07/13/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1849   Reconstruction               6-007-012  08/11/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ High School:
01-1210   New Construction             7-009-001  05/01/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
92-1269   Reconstruction               7-999-002  06/15/93  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0927   Reconstruction               7-999-004  03/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1509EP Energy Project               7-999-E01  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE

AMITYVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-06-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Amityville Memorial High School:
26-0341   Reconstruction               0-001-003  06/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0992   Reconstruction               0-001-004  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0091   Reconstruction               0-001-005  07/31/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1317   Reconstruction               0-001-007  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0636   Reconstruction               0-001-009  05/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            17,800                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            001             8,262                  02/03/08   03/31/08    BEST ROOFING OF NEW JERSEY          
                                                            001           -19,993                  05/29/08   02/23/09    WALSH MECHANICAL CONTRACTORS, INC.  
                                                            002            26,622                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            003           -18,470                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            004            15,000                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            005            30,000                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            006            58,000                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            007           -10,000                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            008            23,053                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            009            45,500                  01/18/08   01/22/08    J. Anthony Enterprises              
                                                            010           -15,460                  05/29/08   09/29/08    J.Anthony Enterprises Inc           
 
07-0099   Reconstruction               0-001-010  09/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1177   Reconstruction               0-001-011  10/01/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0568   Reconstruction               0-001-012  04/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2143   Additions and Alterations    0-001-013  05/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 655                  05/28/19   05/30/19    HARTCORN PLUMBING & HEATING         
                                                            1              36,064                  05/28/19   06/06/19    VRD CONTRACTING INC.                
                                                            1              87,000                  02/10/20   03/18/20    HI TECH AC SERVICE, INC.            
                                                            1                -908                  10/06/21   11/16/22    American Petroleum Equip&Const Co   
                                                            1             -44,311                  01/20/22   11/08/22    Palace Elec Contrs                  
                                                            1             -50,000                  01/20/22   11/03/22    Telcar Certified Ltd                
                                                            10            -29,885                  08/10/21   04/20/22    VRD CONTRACTING, INC.               
                                                            2               3,743                  12/13/19   12/23/19    HARTCORN PLUMBING & HEATING         
                                                            2               5,993                  12/13/19   01/07/20    VRD CONTRACTING, INC.               
                                                            2             -52,875                  07/25/22   05/09/23    Hi Tech Air Cond Serv Inc           
                                                            3               3,198                  02/10/20   03/18/20    HARTCORN PLUMBING & HEATING         
                                                            3              48,195                  02/10/20   06/05/20    VRD CONTRACTING, INC.               
                                                            4            -620,000                  04/08/21   06/22/21    VRD CONTRACTING, INC.               
                                                            5             105,089                  04/08/21   06/23/21    VRD CONTRACTING, INC.               
                                                            6              33,616                  04/08/21   06/22/21    VRD CONTRACTING, INC.               
                                                            7              62,114                  04/08/21   06/22/21    VRD CONTRACTING, INC.               
                                                            8              31,283                  04/08/21   06/22/21    VRD CONTRACTING, INC.               
                                                            9             -31,423                  08/10/21   04/20/22    VRD CONTRACTING, INC.               
 
22-0704   Reconstruction               0-001-014  03/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1627SC Visual Structural Inspection 0-001-SC1  06/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Northeast Elementary School:
92-0424   Reconstruction               0-003-001  12/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0729   Reconstruction               0-003-002  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0631   Reconstruction               0-003-003  03/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1722   Reconstruction               0-003-006  07/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1318   Reconstruction               0-003-007  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0194   Reconstruction               0-003-009  03/14/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1388   Reconstruction               0-003-010  09/12/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1200   Reconstruction               0-003-011  05/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -22,000                  06/06/11   06/16/11    MASPETH CONTRACTING CORP            
 
13-1178   Reconstruction               0-003-013  10/01/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0567   Reconstruction               0-003-014  04/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0528   Reconstruction               0-003-015  11/18/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0362   Reconstruction               0-003-016  12/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,726                  02/10/20   06/08/20    CONSTRUCTION CONSULTANTS, LI        
                                                            1              -5,000                  02/10/20   03/18/20    HIRSCH & CO.                        
                                                            1             -23,040                  07/10/20   08/17/20    HI-TECH AIR CONDITIONING            
                                                            1               5,275                  10/15/20   12/29/20    PALACE ELECTRICAL CONTRACTORS       
                                                            2R             20,433                  07/10/20   08/12/20    CONSTRUCTION CONSULTANTS, LI        
 
22-0705   Reconstruction               0-003-017  03/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0767FP Reconstruction               0-003-FP1  05/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Northwest Elementary School:
92-0730   Reconstruction               0-004-001  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0632   Reconstruction               0-004-002  03/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0950   Reconstruction               0-004-003  02/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0274   Reconstruction               0-004-004  03/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1723   Reconstruction               0-004-005  07/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1319   Reconstruction               0-004-006  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1151   Additions and Alterations    0-004-007  04/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0193   Reconstruction               0-004-008  03/14/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1389   Reconstruction               0-004-009  09/12/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1201   Reconstruction               0-004-010  04/27/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -26,000                  06/06/11   06/16/11    MASPETH CONTRACTING CORP            
 
13-1179   Reconstruction               0-004-012  10/01/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0569   Reconstruction               0-004-013  04/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0527   Reconstruction               0-004-014  11/18/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0363   Additions and Alterations    0-004-015  12/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,238                  12/13/19   01/03/20    IRWIN CONTRACTING                   
                                                            1               1,838                  02/10/20   03/18/20    ROLAND'S ELECTRIC                   
                                                            1              23,434                  07/10/20   08/17/20    G CONSTRUCTION ENTERPRISES, LLC     
                                                            1             -30,087                  07/10/20   08/17/20    BOTTO MECHANICAL                    
                                                            2              12,683                  02/10/20   06/08/20    IRWIN CONTRACTING                   
                                                            2              49,599                  03/02/21   04/19/21    G CONSTRUCTION ENTERPRISES, LLC     
                                                            2               3,527                  05/14/21   08/16/21    ROLAND'S ELECTRIC                   
                                                            3               5,360                  02/10/20   06/08/20    IRWIN CONTRACTING                   
                                                            4             160,000                  07/10/20   08/12/20    IRWIN CONTRACTING                   
                                                            5R            -77,006                  09/09/21   11/29/22    Irwin Contracting                   
 
02-0768FP Reconstruction               0-004-FP1  05/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Park Avenue Elementary:
92-0731   Reconstruction               0-005-002  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0264   Reconstruction               0-005-004  10/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,237                  03/14/06   08/17/07    Statewide Roofing                   
                                                            2              -4,000                  03/14/06   08/17/07    Statewide Roofing                   
 
97-1320   Reconstruction               0-005-005  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1707   Additions and Alterations    0-005-006  11/22/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1             -10,560                  12/30/04   08/16/07    Empire Interior Systems             
                                                            1              12,000          12,000  12/30/04   08/04/08    Feran Develop.                      
                                                            1             -13,500                  12/30/04     /  /      Inter-County Roofing                
                                                            1              11,108                  12/30/04   08/16/07    Maryland Fabricators                
                                                            1              -3,760                  12/30/04   08/17/07    R&D Carpet                          
                                                            1              55,000                  12/30/04     /  /      Sumrart Restoration                 
                                                            1             -10,560                  12/30/04     /  /      Empire Interior Systems             
                                                            1              -8,579                  12/30/04   08/16/07    RMT Electric Corp                   
                                                            1               6,200                  03/14/07   06/13/07    HVAC Incorp                         
                                                            1               7,900                  12/30/04   08/16/07    Roebell Painting                    
                                                            1              10,971                  03/11/06   11/29/07    B. Shervan & Son, Inc.              
                                                            10              2,016           2,016  12/30/04   08/16/07    Empire Interior Systems             
                                                            10            118,634                  03/14/06   08/04/08    Maryland Fabricators                
                                                            10             12,271                  03/14/06   08/17/07    Tradwinds Plumbing                  
                                                            11             52,658                  12/30/04   08/04/08    Empire Interior Systems             
                                                            11             21,259                  03/14/06   08/17/07    Maryland Fabricators                
                                                            11              1,066                  03/14/06   08/17/07    Tradewinds Plumbing                 
                                                            12             26,251                  03/14/06   08/17/07    Maryland Fabricators                
                                                            12              1,415                  03/14/06   08/17/07    Tradewinds Plumbing                 
                                                            13             24,280                  03/14/06   08/17/07    Maryland Fabricators                
                                                            13             15,517                  03/14/06   08/17/07    Tradewinds Plumbing                 
                                                            13            527,774                  03/14/06   08/04/08    Empire Interior Systems             
                                                            13            126,682                  03/14/06   08/04/08    HVAC                                
                                                            13              6,160                  03/14/06   08/04/08    RMT Electric                        
                                                            14             -1,590                  03/14/06   08/16/07    RMT Electric                        
                                                            14             78,802                  03/14/06   10/10/08    Empire Interior                     
                                                            14              4,832                  03/14/06   08/04/08    HVAC Inc                            
                                                            14             27,162                  03/14/06   08/17/07    Maryland Fabricators                
                                                            14            -15,141                  03/14/06   08/17/07    Tradewinds Plumbing                 
                                                            15             -6,231                  03/14/06   06/13/07    Empire Interior Systems             
                                                            15              8,155                  03/14/06   06/13/07    HVAC Inc                            
                                                            15               -394                  06/14/06   08/17/07    Maryland Fabricators                
                                                            15              2,003                  03/14/06   08/17/07    RMT Electric                        
                                                            15                296                  03/14/06   08/17/07    Tradewinds Plumbing                 
                                                            16             19,373                  03/14/06   08/04/08    Empire Interior Systems             
                                                            16             13,006                  03/14/06   08/17/07    Maryland Fabricators                
                                                            16              9,024                  03/14/06   08/17/07    RMT Electric                        
                                                            16             -2,250                  03/14/06   08/17/07    Tradewinds Plumbing                 
                                                            17             10,040                  03/14/06   06/13/07    Empire Interior                     
                                                            17              9,990           2,170  03/14/06   08/17/07    Maryland Fabricators                
                                                            17              8,936                  03/14/06   08/17/07    RMT Electric                        
                                                            17             68,082          50,955  03/14/06   08/04/08    HVAC                                
                                                            18             16,768                  03/14/06   08/04/08    Empire Interior                     
                                                            18              3,535                  03/14/06   06/13/07    HVAC Inc                            
                                                            18             48,743                  03/14/06   08/04/08    RMT Electric                        
                                                            19             16,256                  03/14/06   08/04/08    Empire Interior                     
                                                            19             20,257                  03/14/06   08/17/07    RMT Electric                        
                                                            19             11,304                  03/14/06   08/04/08    HVAC                                
                                                            2             142,570                  12/30/04   08/04/08    Empire Interior Systems             
                                                            2            -163,823                  12/30/04   08/16/07    Feran Develop.                      
                                                            2               3,210                  12/30/04   08/16/07    Maryland Fabricators                
                                                            2               4,530                  12/30/04   08/16/07    RMT Elec.                           
                                                            2              19,363                  12/30/04   08/16/07    Sumrart Restoration                 
                                                            2                 531                  12/30/04   08/16/07    Tradewinds Plumbing                 
                                                            2             142,570                  12/30/04     /  /      Empire Interior Systems             
                                                            2              16,993                  03/14/06   06/13/07    HVAC Incorp                         
                                                            2              16,948                  03/14/06   08/04/08    Shervan Equipment                   
                                                            20             30,301                  03/14/06   08/04/08    Empire Interior Systems             
                                                            20             -2,000                  03/14/06   06/13/07    HVAC Inc                            
                                                            20             15,582                  03/14/06   08/17/07    RMT Electric                        
                                                            21             12,662                  03/14/06   06/13/07    Empire Interior Systems             
                                                            21              3,714                  03/14/06   06/13/07    HVAC Inc                            
                                                            21              3,765                  03/14/06   08/17/07    RMT Electric                        
                                                            22             -2,800                  03/14/06   08/17/07    RMT Elec.                           
                                                            22             14,012                  03/14/06   06/13/07    Empire Interior                     
                                                            22              9,745                  03/14/06   06/13/07    HVAC Inc                            
                                                            23              2,352           1,806  03/14/06   06/13/07    Empire Interior                     
                                                            23             10,603                  03/14/06   06/13/07    HVAC Inc                            
                                                            23             15,323                  03/14/06   08/16/07    RMT Electric                        
                                                            24              1,884                  03/14/06   06/13/07    Empire Interior                     
                                                            25            -15,500                  03/14/06   06/13/07    Empire Interior Systems             
                                                            26              7,740                  03/14/06   06/13/07    Empire Interior Systems             
                                                            3              15,000                  12/30/04   08/16/07    Empire Interior Systems             
                                                            3               2,866                  12/30/04   08/16/07    RMT Elec.                           
                                                            3              19,363                  12/30/04     /  /      Sumrart Restoration                 
                                                            3                 690                  12/30/04   08/16/07    Maryland Fabricators                
                                                            3              19,975                  12/30/04   08/16/07    Ferran Development                  
                                                            3               4,750                  03/14/06   06/13/07    Barist Elevator                     
                                                            3               7,795                  03/14/06   08/17/07    R and Carpet and Tile               
                                                            3               5,000                  03/14/06   08/17/07    Roeball Painting                    
                                                            3               1,260                  12/30/04   08/16/07    Tradewinds Plumbing                 
                                                            3               9,933                  03/14/06   06/13/07    HVAC Incorporated                   
                                                            4             208,202          44,379  12/30/04   08/16/07    Empire Interior Systems             
                                                            4               6,452                  12/30/04   08/16/07    Maryland Fabricators                
                                                            4               2,036                  12/30/04   08/16/07    RMT Elec.                           
                                                            4               6,693                  12/30/04     /  /      Sumrart Restoration                 
                                                            4               5,856                  12/30/04   08/16/07    Tradewinds Plumbing                 
                                                            4                 795                  03/14/06   06/13/07    Barist Elevator Co                  
                                                            4               3,800                  03/14/06   06/13/07    HVAC Incorp                         
                                                            4             208,202          44,379  12/30/04   08/17/07    Empire Interior Systems             
                                                            4               1,830                  03/14/07   08/17/07    R and D Carpet Tile                 
                                                            4              11,696                  03/14/06   08/17/07    Roebell Painting                    
                                                            4                   0                  12/30/04     /  /      Tradewinds Plumbing                 
                                                            5              20,505                  12/30/04   08/16/07    Empire Interior Systems             
                                                            5               5,300                  12/30/04     /  /      Sumrart Restoration                 
                                                            5               2,290                  12/30/04   08/16/07    Tradewinds Plumbing                 
                                                            5              -2,700                  03/14/06   06/13/07    Barist Elevator                     
                                                            5              15,399                  12/30/07   08/16/07    Maryland Fabricators                
                                                            5               5,639                  12/30/04   08/16/07    RMT Electric                        
                                                            5               3,336                  03/14/06   08/07/07    HVAC Incorp                         
                                                            5              20,505                  12/30/07     /  /      Empire Interior Systems             
                                                            5               4,876                  03/14/06   08/17/07    R and D Carpet and Tile             
                                                            5               8,300                  03/14/06   08/17/07    Roebell Painting                    
                                                            6              50,600                  12/30/04   08/04/08    Empire Interior Systems             
                                                            6              33,100                  12/30/04   08/16/07    Maryland Fabricators                
                                                            6              11,783                  12/30/04   08/16/07    Tradewinds Plumbing                 
                                                            6               4,683                  12/30/04   08/16/07    RMT Electric                        
                                                            6               3,696                  03/14/06   08/07/07    HVAC Incorp                         
                                                            6              50,600                  12/30/04     /  /      Empire Interior Systems             
                                                            6               1,649                  03/14/06   08/17/07    R and Carpet and Tile               
                                                            6              12,000                  03/14/06   08/04/08    Roebell Painting                    
                                                            7               8,965                  12/30/04   08/16/07    Empire Interior Systems             
                                                            7               5,142                  12/30/04   08/16/07    RMT Elec.                           
                                                            7               6,200                  03/14/06   06/13/07    HVAC Incorp                         
                                                            7              -2,700                  03/14/06   08/17/07    R and D Carpet and Tile Corp        
                                                            7               6,075                  03/14/06   08/17/07    Roebell Painting                    
                                                            8               3,465                  12/30/04   08/16/07    Empire Interior Systems             
                                                            8               2,256                  12/30/04   08/16/07    RMT Elec.                           
                                                            8               3,360                  03/14/06   06/13/07    HVAC Incorp                         
                                                            8               1,649                  03/14/06   08/17/07    R and D Carpet and tile             
                                                            8              18,567                  03/14/06   08/04/08    Tradewinds Plumbing                 
                                                            8               2,256                  12/30/04   08/16/07    RMT Electric                        
                                                            9               2,872                  12/30/04   08/16/07    Empire Interior Systems             
                                                            9               1,128                  12/30/04   08/16/07    RMT Elec.                           
                                                            9              44,357                  03/14/06   08/17/07    Maryland Fabricators                
                                                            9               9,500                  03/14/06   06/13/07    HVAC Incorp                         
                                                            9              -1,700                  03/14/06   08/17/07    R and D Carpet and Tile             
                                                            9                -528                  03/14/06   08/17/07    Tradewinds Plumbing                 
                                                            9               1,128                  12/30/04   08/16/07    RMT Electric                        
                                                            AMER-2            641                  12/30/04     /  /      Amer. Tech.                         
                                                            B-2            24,321                  03/14/06   08/04/08    Barist Elevator                     
                                                            BAR-1           1,908                  12/30/04     /  /      Barist Elevator                     
                                                            BBR-8           6,892                  12/30/04     /  /      BBR Contracting                     
                                                            HVAC 10         3,300                  03/14/06   06/13/07    HVAC                                
                                                            HVAC 11        36,968                  03/14/06     /  /      HVAC Inc                            
                                                            HVAC 12        69,950                  03/14/06   08/04/08    HVAC Inc                            
                                                            RMT 10          3,252                  03/14/06   08/04/08    Rmt Electric                        
                                                            RMT-11            897                  03/14/06   08/17/07    RMT Electric                        
                                                            ROEB-1          7,900                  12/30/04   08/17/07    Roebell Painting                    
                                                            TECH-1          3,780                  12/30/04   08/17/07    TechClean                           
 
98-1358   Reconstruction               0-005-007  07/15/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -13,500                  12/30/04   08/16/07    Inter-County Roofing                
                                                            1              55,000                  12/30/04   08/16/07    Sumrart Restoration                 
                                                            2              19,363                  12/30/04   08/16/07    Sumrart Restoration                 
                                                            3              19,363          19,363  12/30/04   08/16/07    Sumrart Restoration                 
                                                            4               6,693                  12/30/04   08/16/07    Sumrart Restoration                 
                                                            5               5,300                  12/30/04   08/16/07    Sumrart Restoration                 
 
01-0827   Reconstruction               0-005-008  03/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,096                  12/30/04   08/16/07    BBR Contracting Corp                
                                                            1               2,444                  12/30/04   08/16/07    American Tech. Inc                  
                                                            1               1,908                  12/30/04   08/16/07    Barist Elevator                     
                                                            1              24,325                  12/30/04   08/16/07    Arch Windows                        
                                                            1               3,780                  12/30/04   08/16/07    TechClean Inc                       
                                                            10              3,557                  03/14/06   06/13/07    American Tech                       
                                                            11              1,159                  03/14/06   06/13/07    American Tech                       
                                                            11             36,968                  03/14/06   08/04/08    HVAC                                
                                                            12             -1,500                  03/14/06   06/13/07    American Tech                       
                                                            12             50,988                  03/14/06   08/04/08    Empire Contracting                  
                                                            13            527,774                  03/14/06     /  /      Empire Interior                     
                                                            13            126,682                  03/14/06     /  /      HVAC Inc                            
                                                            16             10,292                  03/14/06   08/04/08    HVAC                                
                                                            17             68,082          50,958  03/14/06   06/13/07    HVAC Inc                            
                                                            19             11,304           8,150  03/14/06   06/13/07    Hvac Inc                            
                                                            2                 641                  12/30/04   08/16/07    American Tech                       
                                                            2             306,082         117,082  03/14/06   08/17/07    R and d Carpet and Tile Corp        
                                                            2              87,907                  03/14/06   11/29/07    Roebell Painting                    
                                                            2              -5,177                  03/14/06   06/13/07    Architectural Windows               
                                                            3               2,669                  12/30/04   08/16/07    BBR Contracting                     
                                                            3              17,535                  03/14/07   06/13/07    American Tech                       
                                                            3             -14,984                  03/14/06   06/13/07    Architectural Window                
                                                            4              12,722                  03/14/06   06/13/07    American Tech                       
                                                            4              25,204                  03/14/06   08/04/08    Architectural Window                
                                                            4              12,636                  12/30/04   08/16/07    BBR Contracting                     
                                                            5              11,274                  03/14/07   06/13/07    American Tech                       
                                                            5              27,940                  03/14/06   08/04/08    Architectural Tech                  
                                                            5              16,087                  12/30/04   08/16/07    BBR Contracting                     
                                                            6               3,257                  03/14/06   06/13/07    American Tech                       
                                                            6              11,719                  03/14/06   06/13/07    Architectural Window                
                                                            6               8,177                  12/30/04   08/16/07    BBR Contracting                     
                                                            7              39,288                  03/14/06   08/04/08    Tradwwinds Plumbing                 
                                                            7               1,866                  03/14/06   06/13/07    American Tech                       
                                                            7               8,298                  03/14/06   09/17/07    Architectural Window                
                                                            8               1,667                  03/14/06   06/13/07    American Tech                       
                                                            8               6,891                  12/30/04   08/16/07    BBR Contracting Corp.               
                                                            8               4,310                  03/14/06   08/16/07    Maryland Fabricators                
                                                            9               4,101           3,939  03/14/06   06/13/07    American Tech                       
                                                            BBR-7R2         4,272                  12/30/04     /  /      BBR Contracting                     
                                                            GC-1            5,924                  03/14/06   08/04/08    George Campbell Associates          
                                                            GC-10         -22,500                  03/14/06   06/13/07    George Campbell                     
                                                            GC-2           87,507          87,507  03/14/06   08/04/08    George Campbell Associates          
                                                            GC-3           73,647          73,647  03/14/06   08/04/08    George Campbell Associates          
                                                            GC-4           70,945          70,945  03/14/06   06/13/07    George Campbell Associates          
                                                            GC-5           19,282                  03/14/06   06/13/07    George Campbell                     
                                                            GC-6              598                  03/14/06   06/13/07    George Campbell                     
                                                            GC-7            9,759                  03/14/06   06/13/07    George Campbell                     
                                                            GC-8           32,000                  03/14/06   06/13/07    George Campbell                     
                                                            GC-9          -65,000                  03/14/06   06/13/07    George Campbell                     
                                                            M-7            48,848          23,822  03/14/06   10/10/08    Maryland Fabricators                
                                                            RMT-12         46,733                  03/14/06   08/04/08    RMT Electric                        
 
03-1119   Reconstruction               0-005-009  03/19/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  01/30/06   06/05/07    Construction Consultants            
                                                            10              4,350                  01/30/06   06/05/07    Construction Consultants            
                                                            11              9,773                  01/30/06   06/05/07    Construction Consultants            
                                                            12              2,080                  01/30/06   06/05/07    Construction Consultants            
                                                            13             -9,000                  01/30/06   06/05/07    Construction Consultants            
                                                            14              5,000                  01/30/06   06/05/07    Construction Consultants            
                                                            15                984                  01/30/06   06/05/07    Construction Consultants            
                                                            16             -1,500                  01/30/06   06/05/07    Construction Consultants            
                                                            2               2,700                  01/30/06   06/05/07    Construction Consultants            
                                                            3               2,500                  01/30/06   06/05/07    Construction Consultants            
                                                            4               5,320                  01/30/06   06/05/07    Construction Consultants            
                                                            6              61,000                  01/30/06   06/05/07    Construction Consultants            
                                                            7               3,750                  01/30/06   06/05/07    Construction Consultants            
                                                            8               3,200                  01/30/06   06/05/07    Construction Consultants            
                                                            9              16,837                  01/30/06   06/05/07    Construction Consultants            
 
13-1180   Reconstruction               0-005-012  10/01/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0570   Reconstruction               0-005-013  04/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1723   Reconstruction               0-005-014  11/27/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -8,727                  02/08/19   02/22/19    ROLANDS ELECTRIC INC                
                                                            1              -5,000                  03/22/19   04/08/19    BOTTO MECHANICAL                    
                                                            1              -5,000                  10/06/21   11/16/22    American Petroleum Equipment        
                                                            1MC            -7,722                  07/02/19   07/09/19    JNS HEATING SERVICE, INC.           
                                                            2                 895                  03/01/19   03/07/19    ROLAND'S ELECTRIC, INC.             
                                                            2                 895                  03/22/19   04/08/19    ROLAND'S ELECTRIC, INC              
 
16-0913   Reconstruction               0-005-015  03/30/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              46,185                  12/29/17   01/23/18    Five Twelve Restoration Inc.        
                                                            2              99,467                  12/29/17   01/23/18    Five Twelve Restoration Inc.        
                                                            3              20,000                  05/04/18   05/07/18    Five Twelve Restoration Inc.        
                                                            4             108,519                  05/04/18   05/07/18    Five Twelve Restoration Inc.        
                                                            5              -9,519                  07/02/19   07/25/19    FIVE TWELVE RESTORATION INC.        
 
19-0216   Reconstruction               0-005-016  08/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1630   Reconstruction               0-005-017  04/24/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Edmund Miles Middle School:
90-1684   Reconstruction               0-008-001  06/27/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1492   Reconstruction               0-008-002  07/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0732   Reconstruction               0-008-004  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0630   Reconstruction               0-008-005  03/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1333   Reconstruction               0-008-007  04/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1321   Reconstruction               0-008-009  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1085   Reconstruction               0-008-012  05/11/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -42,390                  01/18/08   01/22/08    Best Roofing of New Jersey          
                                                            002            20,900                  03/21/08   04/07/08    BEST ROOFING OF NEW JERSEY          
                                                            003             3,500                  03/21/08   04/07/08    BEST ROOFING OF NEW JERSEY          
 
13-1181   Reconstruction               0-008-014  10/01/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0571   Reconstruction               0-008-015  04/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1724   Reconstruction               0-008-016  11/29/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,853                  07/20/18   08/06/18    ARROW STEEL WINDOW CORP             
                                                            1              13,868                  03/01/19   03/12/19    THE PATRIOT ORGANIZATION            
                                                            1              -5,000                  03/22/19   04/01/19    AMBROSIO & COMPANY                  
                                                            1              22,052                  05/28/19   10/04/19    AL CONSTRUCTION SERVICES, INC.      
                                                            1             -10,000                  07/02/19   07/09/19    VSC ELECTRIC, INC.                  
                                                            1MC            20,000                  07/02/19   07/09/19    JNS HEATING SERVICE, INC.           
                                                            2              68,000                  03/01/19   04/25/19    ARROEW STEEL WINDOW CORP.           
                                                            3             -20,200                  12/13/19   01/15/20    ARROW STEEL WINDOW CORP.            
 
22-1939   Reconstruction               0-008-017  04/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0769FP Reconstruction               0-008-FP1  05/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0995SC Visual Structural Inspection 0-008-SC1  11/30/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Portable @ Edmund Miles MS:
98-1124   New Construction             0-020-001  06/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Portable @ Miles MS:
98-1164   New Construction             0-021-001  06/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Admin Bldg:
17-0851   Reconstruction               1-002-002  02/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -51,050                  03/01/19   03/15/19    LI ROOFING & REPAIR SERVOCES CORP.  
                                                            1             -71,000                  07/10/20   09/18/20    A-1 CONSTRUCTION SERVICES           
 

          Amityville Public Library:
93-0389   Reconstruction               6-015-001  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1540   Reconstruction               6-015-002  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1328   Reconstruction               6-015-003  08/19/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0498   Reconstruction               6-015-004  05/07/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1332   Reconstruction               6-015-005  08/12/11  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1369   Reconstruction               6-015-007  05/14/19  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0058   Additions and Alterations    6-015-008  01/02/24  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
92-0298   Reconstruction               7-999-001  09/22/92  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0547   Reconstruction               7-999-003  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE

DEER PARK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-07-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Abraham Lincoln Elementary:
01-1062   Reconstruction               0-001-006  04/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,562                  09/12/02   10/21/02    Aztec Plumbing                      
 
02-1064   Reconstruction               0-001-007  02/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1189   Reconstruction               0-001-008  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0260   Reconstruction               0-001-009  12/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0555   Reconstruction               0-001-010  07/25/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1315   Reconstruction               0-001-011  09/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              24,254                  08/02/23   08/22/23    JOHNSON CONTROLS INC                
 
02-1038FP Reconstruction               0-001-FP1  02/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1063SC Visual Structural Inspection 0-001-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1353SC Visual Structural Inspection 0-001-SC2  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          JF Kennedy Junior High:
90-1563   Reconstruction               0-002-008  07/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0146   Reconstruction               0-002-009  08/12/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0110   Reconstruction               0-002-011  09/17/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0829   Reconstruction               0-002-012  02/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0353   Reconstruction               0-002-013  01/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1602   Reconstruction               0-002-014  07/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1137   Reconstruction               0-002-016  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1469   Reconstruction               0-002-017  05/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0984   Reconstruction               0-002-018  04/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0985   Reconstruction               0-002-020  04/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0733   Reconstruction               0-002-021  05/05/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,629                  09/12/02   09/17/02    Aztec Plumbing                      
 
97-0376   Reconstruction               0-002-023  12/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1593   Reconstruction               0-002-026  07/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0948   Reconstruction               0-002-027  05/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0437   Reconstruction               0-002-028  02/04/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1128   Reconstruction               0-002-029  05/14/99  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1190   Reconstruction               0-002-031  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0261   Reconstruction               0-002-032  12/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0302   Reconstruction               0-002-033  06/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1351   Reconstruction               0-002-034  05/21/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1044   Reconstruction               0-002-035  06/24/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0142   Reconstruction               0-002-036  12/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,541                  09/06/18   09/11/18    SEAFORD AVENUE CORP                 
 
18-0027   Reconstruction               0-002-037  07/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1408   Reconstruction               0-002-038  03/20/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  02/10/22   02/13/23    Irwin Contrg Inc                    
 
20-0342   Reconstruction               0-002-039  10/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0231   Reconstruction               0-002-040  09/22/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1316   Reconstruction               0-002-041  09/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             206,668                  08/02/23   08/22/23    Johnson Controls Inc.               
 
21-1472   Reconstruction               0-002-042  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1374FC Reconstruction               0-002-043  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0712   Reconstruction               0-002-044  04/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1040FP Reconstruction               0-002-FP1  02/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0966SC Visual Structural Inspection 0-002-SC1  03/17/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1354SC Visual Structural Inspection 0-002-SC2  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Memorial Elementary:
95-1459   Reconstruction               0-003-002  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1601   Reconstruction               0-003-003  07/01/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              23,666                  10/20/05   10/20/05    PremierNew York                     
 
01-1063   Reconstruction               0-003-006  04/26/02  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1191   Reconstruction               0-003-007  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0143   Reconstruction               0-003-008  12/22/16  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1317   Reconstruction               0-003-009  09/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1352SC Visual Structural Inspection 0-003-SC1  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          May Moore Elementary School:
90-0753   Reconstruction               0-004-010  01/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1708   Reconstruction               0-004-012  07/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1466   Reconstruction               0-004-013  08/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1401   Reconstruction               0-004-015  06/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1603   Reconstruction               0-004-016  07/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1138   Reconstruction               0-004-017  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1769   Reconstruction               0-004-018  08/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1112   Reconstruction               0-004-019  04/02/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0734   Reconstruction               0-004-022  05/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0377   Reconstruction               0-004-024  12/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1592   Reconstruction               0-004-027  07/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1716   Reconstruction               0-004-030  10/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -30,814                  09/06/05   09/13/05    WJ Northridge Construction          
                                                            001           -47,063                  09/08/05   09/13/05    Gordon Seaman Inc                   
 
09-1192   Reconstruction               0-004-031  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0262   Reconstruction               0-004-032  12/02/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -1,750                  11/03/14   11/12/14    Watral Brothers, Inc.               
 
15-1045   Reconstruction               0-004-033  06/24/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0458   Reconstruction               0-004-034  06/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,150                  11/30/18   01/16/19    ACL CONSTRUCTION CORP.              
 
16-1865   Additions and Alterations    0-004-035  08/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0028   Reconstruction               0-004-036  07/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0242   Reconstruction               0-004-037  10/02/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1318   Reconstruction               0-004-038  09/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              38,671                  08/02/23   08/22/23    JOHNSON CONTROLS INC                
                                                            4              80,580                  08/02/23   08/22/23    JOHNSON CONTROLS INC                
 
21-1473   Reconstruction               0-004-039  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1375FA Reconstruction               0-004-040  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1041FP Reconstruction               0-004-FP1  02/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1351SC Visual Structural Inspection 0-004-SC1  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXG. Washington School (sold 7/2019):
90-1528   Reconstruction               0-005-004  06/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1460   Reconstruction               0-005-005  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1605   Reconstruction               0-005-006  07/01/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,000                  03/10/03   03/24/03    L.Martone and Sons                  
 
01-1064   Reconstruction               0-005-008  04/26/02  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1193   Reconstruction               0-005-009  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1355SC Visual Structural Inspection 0-005-SC1  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
90-1564   Reconstruction               0-006-009  07/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1529   Reconstruction               0-006-010  06/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1569   Reconstruction               0-006-011  07/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1476   Reconstruction               0-006-012  07/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1527   Reconstruction               0-006-016  06/21/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0147   Reconstruction               0-006-017  09/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1604   Reconstruction               0-006-019  07/01/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -6,000                  03/10/03   03/24/03    L.Martone and Sons                  
 
96-1366   Reconstruction               0-006-020  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1139   Reconstruction               0-006-021  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0650   Reconstruction               0-006-022  01/16/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1467   Reconstruction               0-006-023  05/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0986   Reconstruction               0-006-024  04/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0987   Reconstruction               0-006-026  04/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0735   Reconstruction               0-006-027  05/05/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,493                  09/12/02   09/17/02    Aztec Plumbing                      
                                                            2               3,711                  09/12/02   09/17/02    Aztec Plumbing                      
 
97-1703   Reconstruction               0-006-029  09/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1594   Reconstruction               0-006-031  07/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0242   Reconstruction               0-006-032  11/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1767   Reconstruction               0-006-033  07/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1882   Reconstruction               0-006-034  10/06/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0458   Additions and Alterations    0-006-036  01/26/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0969   Reconstruction               0-006-038  04/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1037   Reconstruction               0-006-041  10/02/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -773                  09/16/02   01/08/03    SJS Const.                          
                                                            1               3,700                  06/17/03   07/11/03    Tri Town Elec.                      
 
02-0271   Reconstruction               0-006-042  01/17/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -7,513                  05/13/05   06/07/05    Norberto Construction               
 
02-1065   Reconstruction               0-006-043  02/21/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002           -10,000                  04/28/05   03/02/06    satewide Roofing Inc                
                                                            1             439,000                  04/28/05   03/02/06    Statewide Roofing Inc               
 
02-1717   Reconstruction               0-006-044  10/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -14,194                  04/28/05   06/29/05    LEb Electric                        
 
07-1096   Reconstruction               0-006-045  11/26/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-ELEC            0                  06/27/11   07/18/11    PALACE ELECTRICAL CONTRACTORS INC   
                                                            001-GC         16,000                  01/15/10   03/01/10    ROCKMORE CONTRACTING CORP           
                                                            001-MECH       -3,500                  01/15/10   03/01/10    INTEGRATED HVAC SYSTEMS & SERVICES  
                                                            001-PL          3,177                  01/15/10   03/01/10    NORTHEASTER PLUMB/HEAT/ELECT CORP   
                                                            002-ELEC       -2,106                  06/27/11   07/18/11    PALACE ELECTRICAL CONTRACTORS INC   
                                                            002-GC          5,500                  01/15/10   09/20/11    ROCKMORE CONTRACTING CORP           
 
09-1194   Reconstruction               0-006-046  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0589   Reconstruction               0-006-047  06/16/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1396   Reconstruction               0-006-048  07/28/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One              -900                  12/16/13   01/10/14    Pioneer Landscaping & Asphalt       
 
11-1446   Reconstruction               0-006-049  07/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1230   Reconstruction               0-006-050  07/25/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -2,500                  10/21/13   12/06/13    Rosemar Construction, Inc.          
                                                            One             6,985                  01/10/14   02/07/14    A-1 Construction & Renovation       
 
13-0263   Reconstruction               0-006-051  12/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0303   Reconstruction               0-006-052  06/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1046   Reconstruction               0-006-053  06/24/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0144   Reconstruction               0-006-054  12/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,365                  01/02/18   01/25/18    Benchmark Construction Group        
                                                            1             -75,000                  08/08/18     /  /      JNS HEATING SERVICE                 
                                                            2               4,177                  02/19/19   02/25/19    SEAFORD AVENUE CORP                 
 
17-1033   Reconstruction               0-006-056  10/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              16,412                  09/13/19   09/16/19    THE LANDTEK GROUP, INC.             
                                                            1              -9,000                  11/22/19   12/05/19    WALSH MECHANICAL                    
                                                            1              -3,000                  01/02/20   01/22/20    AMBROSIO & COMPANY, INC.            
                                                            1             -12,500                  01/02/20   01/22/20    LEB ELECTRIC, LTD.                  
                                                            THREE         -10,000                  02/13/20   06/02/20    THE LANDTEK GROUP, INC.             
                                                            TWO             6,821                  01/02/20   01/27/20    THE LANDTEK GROUP, INC.             
 
18-0029   Reconstruction               0-006-057  07/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0965   Reconstruction               0-006-058  02/28/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0343   Reconstruction               0-006-059  10/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0569   Reconstruction               0-006-060  12/11/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1319   Reconstruction               0-006-061  09/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5             261,946                  08/02/23   08/22/23    JOHNSON CONTROLS INC                
 
21-1474   Reconstruction               0-006-062  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1376FC Reconstruction               0-006-063  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0713   Reconstruction               0-006-064  04/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0142   Reconstruction               0-006-065  11/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1036FP Reconstruction               0-006-FP1  02/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1064SC Visual Structural Inspection 0-006-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1394SC Visual Structural Inspection 0-006-SC2  01/16/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1357SC Visual Structural Inspection 0-006-SC3  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Q. Adams Elementary:
92-1467   Reconstruction               0-007-005  08/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1306   Reconstruction               0-007-007  05/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1140   Reconstruction               0-007-008  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1468   Reconstruction               0-007-009  05/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1241   Reconstruction               0-007-010  04/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1242   Reconstruction               0-007-012  04/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0736   Reconstruction               0-007-013  05/05/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,126                  09/12/02   09/17/02    Aztec Plumbing                      
 
97-0378   Reconstruction               0-007-015  12/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1595   Reconstruction               0-007-018  07/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0497   Reconstruction               0-007-019  01/26/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1281   Reconstruction               0-007-020  07/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1272   Reconstruction               0-007-021  06/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               2,425                  12/31/01   02/28/02    All Service Elec.                   
 
09-1195   Reconstruction               0-007-023  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0264   Reconstruction               0-007-024  12/02/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -3,284                  10/21/14   10/23/14    Light House Designs, Inc.           
 
14-0304   Reconstruction               0-007-025  06/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1047   Reconstruction               0-007-026  06/24/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             630,960                  05/04/17   05/12/17    GTS Construction Corp.              
 
16-0459   Reconstruction               0-007-027  06/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3             -19,000                  11/30/18   01/16/19    ACL CONSTRUCTION CORP.              
 
16-1866   Reconstruction               0-007-028  08/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0030   Reconstruction               0-007-029  07/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0243   Reconstruction               0-007-030  10/02/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1320   Reconstruction               0-007-031  09/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6              74,903                  08/02/23   08/22/23    JOHNSON CONTROLS INC                
 
21-1475   Reconstruction               0-007-032  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1377FA Reconstruction               0-007-033  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1039FP Reconstruction               0-007-FP1  02/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0965SC Visual Structural Inspection 0-007-SC1  03/17/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1356SC Visual Structural Inspection 0-007-SC2  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Robert Frost Junior High:
92-1468   Reconstruction               0-008-008  08/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1461   Reconstruction               0-008-011  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1606   Reconstruction               0-008-012  07/01/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -6,000                  03/10/03   03/24/03    L.Martone and Sons                  
 
96-1141   Reconstruction               0-008-013  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1770   Reconstruction               0-008-014  08/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1243   Reconstruction               0-008-015  04/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1244   Reconstruction               0-008-017  04/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0737   Reconstruction               0-008-018  05/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0379   Reconstruction               0-008-020  12/19/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5 Rev.          2,016                  11/01/02   01/08/03    Architectural Window Mfg.           
 
97-1596   Reconstruction               0-008-023  07/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0496   Reconstruction               0-008-024  01/26/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1129   Reconstruction               0-008-025  05/14/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1424   Reconstruction               0-008-027  04/02/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,250                  08/21/01   05/23/02    Argo Contracting                    
                                                            2               2,442                  02/04/02   02/05/02    Argo Contracting                    
 
09-1196   Reconstruction               0-008-029  12/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0265   Reconstruction               0-008-030  12/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0305   Reconstruction               0-008-031  06/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,500                  05/25/16   06/07/16    TELSAN ELECTRIC                     
 
15-1048   Reconstruction               0-008-032  06/24/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0460   Reconstruction               0-008-033  06/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,000                  01/02/18   01/23/18    McHugh Institutional Furnishings    
                                                            1             -15,000                  11/05/18   01/23/19    MILCON CONSTRUCTION                 
                                                            1             -10,000                  04/15/19   04/16/19    HIRSCH & CO.,LLC                    
                                                            2                -905                  11/30/18   01/16/19    ACL CONSTRUCTION CORP.              
 
18-0031   Reconstruction               0-008-035  07/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0344   Reconstruction               0-008-036  10/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1321   Reconstruction               0-008-037  09/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            7             159,990                  08/02/23   08/22/23    JOHNSON CONTROLS                    
 
21-1378FC Reconstruction               0-008-038  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1476   Reconstruction               0-008-039  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1037FP Reconstruction               0-008-FP1  02/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0964SC Visual Structural Inspection 0-008-SC1  03/17/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1350SC Visual Structural Inspection 0-008-SC2  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Annex Office Buildin:
00-0197   Reconstruction               1-009-002  01/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              34,000                  08/21/01   01/09/02    Irwin Contracting                   
                                                            2               5,537                  01/17/02   03/26/02    Irwin Contracting                   
 
12-0093   Reconstruction               1-009-003  10/31/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          Abraham Lincoln Elem.:
90-1530   Reconstruction               2-001-001  06/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1583   Reconstruction               2-001-002  06/21/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1607   Reconstruction               2-001-003  07/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Trans Annex(Fuel-Buses only):
09-1228   Reconstruction               5-017-002  05/28/10  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1322   Reconstruction               5-017-004  09/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            8               4,721                  08/02/23   08/22/23    JOHNSON CONTROLS                    
 

          Deer Park Public Library:
03-1642   Reconstruction               6-010-002  07/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0103   Additions and Alterations    6-010-003  08/03/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -1,000                  12/08/08   01/22/09    LASER INDUSTERIES                   
 
10-0088   Reconstruction               6-010-004  08/24/10  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0008   Reconstruction               6-010-005  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
10-1397   New Construction             7-014-001  07/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
05-0339   Reconstruction               7-999-001  06/14/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -12,000                  08/24/07   09/06/07    RELLE ELECTRIC CORP.                
 
07-1095   Reconstruction               7-999-002  11/18/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-ELEC      -30,000                  01/15/10   02/25/10    RELLE ELECTRIC CORP                 
                                                            001-GC           -800                  01/15/10   02/25/10    PETROVANO & ASSOCIATES INC          
                                                            002-GC        -15,000                  01/15/10   02/25/10    PETROVANO & ASSOCIATES INC          
 
07-1154   Reconstruction               7-999-003  11/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-GC           -693                  06/10/13   07/31/13    Vezandio Contracting Corp.          
                                                            009-GC         -2,500                  06/10/13     /  /      Vezandio Contracting Corp.          
 

WYANDANCH UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-09-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXStraight Path Sch-"99-see1001):
95-0032   Reconstruction               0-001-008  07/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1008   New Construction             0-001-009  06/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1175   Reconstruction               0-001-010  06/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          ML King Elem/LaFrancis:
90-1823   Reconstruction               0-002-004  07/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0381   Reconstruction               0-002-006  11/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1250   Reconstruction               0-002-012  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0264   Reconstruction               0-002-013  10/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0657   Reconstruction               0-002-017  02/07/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1181   Reconstruction               0-002-018  07/05/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1040   Reconstruction               0-002-020  06/22/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0412   Reconstruction               0-002-021  03/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1547   Reconstruction               0-002-023  05/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1182   Reconstruction               0-002-024  04/13/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -7,094                  08/24/11   09/07/11    TOTAL CONSTRUCTION CORP             
 
11-0827   Reconstruction               0-002-026  05/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-2-1         15,595                  10/04/12   02/15/13    STATEWIDE ROOFING INC               
                                                            RC-2-2         21,205                  10/04/12   02/15/13    STATEWIDE ROOFING INC               
                                                            RC-2-3          5,611                  10/04/12   02/15/13    STATEWIDE ROOFING INC               
 
12-0070   Reconstruction               0-002-027  10/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3           10,003                  10/28/13   01/31/14    Eldor Contracting Corporation       
                                                            EC-6              897                  10/28/13   12/04/13    Eldor Contracting Corporation       
                                                            EC-7            2,919                  10/28/13   12/04/13    Eldor Contracting Corporation       
                                                            EC-8            2,435                  10/28/13   12/04/13    Eldor Contracting Corporation       
                                                            EC-9              806                  10/28/13   12/04/13    Eldor Contracting Corporation       
                                                            GC-8             -760                  01/28/14   07/18/14    Renu Construction & Restoration, Inc
 
12-0164   Reconstruction               0-002-028  10/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4-2          9,034                  10/28/13   05/06/16    Arrow Steel Window Corp.            
                                                            GC-4-3        136,339                  01/28/14   07/18/14    Arrow Steel Window Corp.            
                                                            SC-1          -38,150                  04/02/14   05/06/14    H & A Landscape of L.I., Inc.       
 
13-0833   Reconstruction               0-002-029  06/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-06          -2,000                  05/02/16   07/07/16    L.E.B. Electric Ltd.                
                                                            GC-04          14,162                  12/16/15   01/15/16    Stalco Construction, Inc.           
                                                            GC-07          -1,952                  12/16/15   01/15/16    Stalco Construction, Inc.           
 
16-2043   Reconstruction               0-002-030  11/22/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-02           2,945                  01/09/23   11/15/23    HIRSCH & CO LLC                     
                                                            PC-03         129,725                  01/09/23   11/15/23    HIRSCH & CO LLC                     
                                                            PC-04          31,064                  01/09/23     /  /      HIRSCH & CO LLC                     
                                                            PC-05          21,461                  01/09/23   11/15/23    HIRSCH & CO LLC                     
                                                            PC-07            -689                  01/09/23   11/15/23    HIRSCH & CO LLC                     
 
94-0312EP Energy Project               0-002-E01  10/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0719FP Reconstruction               0-002-FP1  03/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wyandanch Memorial High School:
90-1824   Reconstruction               0-004-005  07/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0560   Reconstruction               0-004-007  01/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0265   Reconstruction               0-004-010  10/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0159   Reconstruction               0-004-013  02/07/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1182   Reconstruction               0-004-014  07/06/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1041   Reconstruction               0-004-016  06/22/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0413   Reconstruction               0-004-017  03/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0582   Reconstruction               0-004-018  12/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01           8,364                  07/23/10   11/30/10    MARFI CONTRACTING CORP              
 
11-0829   Reconstruction               0-004-020  05/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EQ-1          -10,000                  06/06/13   07/12/13    Helath & Educational Equipment Corp.
 
12-0071   Reconstruction               0-004-021  10/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-1           12,400                  10/28/13   02/03/14    Eldor Contracting Corporation       
                                                            EC-10           4,818                  01/28/14   07/18/14    Eldor Contracting Corporation       
                                                            EC-12           4,458                  08/26/14   10/03/14    Eldor Contracting Corporation       
                                                            EC-5            4,164                  10/28/13   01/31/14    Eldor Contracting Corporation       
                                                            EQ-1           -5,880                  10/28/13   02/03/14    Nickerson Corporation               
                                                            EQ-2          -25,000                  02/24/14   03/10/14    Nickerson Corporation               
                                                            GC-1           68,500                  10/28/13   12/06/13    Renu Contracting & Restoration, Inc.
                                                            GC-11         -25,506                  01/28/14   07/18/14    Renu Contracting & Restoration, Inc.
                                                            GC-13         -10,325                  01/28/14   07/18/14    Renu Contracting & Renovation, Inc. 
                                                            GC-16         -10,860                  08/26/14   10/03/14    Renu Contracting & Restoration, Inc.
                                                            GC-17          -3,375                  08/26/14   10/03/14    Renu Contracting & Restoration, Inc.
                                                            GC-2           19,085                  01/28/14   07/18/14    Renu Contracting & Restoration, Inc.
                                                            GC-4          -30,300                  01/27/14   07/18/14    Renu Contracting & Restoration, Inc.
                                                            GC-6           -8,280                  01/28/14   07/18/14    Renu Contracting & Restoration, Inc.
                                                            GC-9             -595                  01/28/14   07/18/14    Renu Contracting & Restoration, Inc.
                                                            HC-1           -4,050                  07/15/15   08/14/15    Thermo Tech Combustion Inc.         
                                                            PC-01           8,226                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
                                                            PC-10          -4,500                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
                                                            PC-11          -9,136                  02/24/14   03/10/14    Advanced Conservation Systems, Inc. 
                                                            PC-2            9,158                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
                                                            PC-8             -582                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
                                                            PC-9             -881                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
 
12-0165   Reconstruction               0-004-022  10/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4-1         77,366                  10/28/13   12/06/13    Arrow Steel Window Corp.            
 
13-0834   Reconstruction               0-004-023  06/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-01           8,164                  07/02/15   08/04/15    LEB Electric Ltd.                   
                                                            EC-02           1,494                  08/27/15   09/01/15    L.E.B. Electric Ltd.                
                                                            EC-03           9,100                  08/27/15     /  /      L.E.B. Electric Ltd.                
                                                            EC-05         -11,134                  03/10/16   03/17/16    L.E.B. Electric Ltd.                
                                                            GC-03           2,742                  11/02/15   12/02/15    Stalco Construction, Inc.           
                                                            GC-05          -2,894                  12/16/15   01/15/16    Stalco Construction, Inc.           
                                                            GC-10          -3,981                  03/10/16   03/17/16    Stalco Construction, Inc.           
                                                            HC-01         -15,436                  03/10/16   03/17/16    Premier Mechanical Services, Inc.   
                                                            TS-01           2,175                  11/02/15   12/02/15    Young Equipment Sales, Inc.         
 
94-0313EP Energy Project               0-004-E01  10/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Olive Middle School:
90-1825   Reconstruction               0-005-005  07/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0266   Reconstruction               0-005-008  10/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1710   Reconstruction               0-005-012  05/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1           -35,000                  01/23/04     /  /      Statewide Roofing                   
 
04-0271   Reconstruction               0-005-013  11/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0160   Reconstruction               0-005-014  02/07/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1183   Reconstruction               0-005-015  07/06/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1042   Reconstruction               0-005-017  06/22/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0414   Reconstruction               0-005-018  03/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0828   Reconstruction               0-005-019  05/11/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0072   Reconstruction               0-005-020  10/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-11           5,269                  01/28/14   07/18/14    Eldor Contracting Corporation       
                                                            EC-2            7,185                  10/28/13   01/31/14    Eldor Contracting Corporation       
                                                            EC-4            3,050                  10/28/13   12/04/13    Eldor Contracting Corporation       
                                                            GC-10          -1,120                  01/28/14   07/18/14    Reno Contracting & Restoration, Inc.
                                                            GC-12          -7,260                  01/28/14     /  /      Renu Contracting & Renovation, Inc. 
                                                            GC-3          -14,650                  01/28/14   07/18/14    Reno Contracting & Restoration, Inc.
                                                            GC-7           -6,800                  01/28/14   07/18/14    Renu Contracting & Restoration, Inc.
                                                            PC-3             -277                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
                                                            PC-4           -2,872                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
                                                            PC-5           -2,099                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
                                                            PC-6             -664                  01/28/14   07/18/14    Advanced Conservation System, Inc.  
                                                            PC-7           -1,099                  01/28/14   07/18/14    Advanced Conservation Systems, Inc. 
 
12-0166   Reconstruction               0-005-021  10/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4-2          9,034                  10/28/13   12/10/13    Arrow Steel Window Corp.            
 
13-0835   Reconstruction               0-005-022  06/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-04          11,500                  08/27/15   09/01/15    L.E.B. Electric Ltd.                
                                                            GC-01           9,162                  11/02/15   12/02/15    Stalco Construction, Inc.           
                                                            GC-02          26,627                  11/02/15   12/02/15    Stalco Construction, Inc.           
                                                            GC-06          24,629                  12/16/15   01/15/16    Stalco Construction, Inc.           
                                                            GC-08         250,560                  12/16/15   01/15/16    Stalco Construction, Inc.           
                                                            GC-09          -4,177                  03/10/16   03/17/16    Stalco Construction, Inc.           
                                                            PC-01           8,592                  08/27/15   09/01/15    Ambrosio & Co. Inc.                 
 
14-1354   Reconstruction               0-005-023  04/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1879   Reconstruction               0-005-024  09/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0314EP Energy Project               0-005-E01  10/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          6 Clrm Modular @ Olive MS:
15-1966   New Construction             0-011-001  07/28/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          30,501                  12/09/16   12/15/16    J.P. Daly & Sons, Inc.              
                                                            EC-02             835                  12/09/16   12/15/16    J.P. Daly & Sons, Inc.              
                                                            EC-03           5,039                  12/09/16     /  /      J.P. Daly & Sons, Inc.              
                                                            EC-04           9,241                  01/26/17   01/31/17    J.P. Daly & Sons, Inc.              
                                                            EC-05           2,946                  01/26/17   01/31/17    J.P. Daly & Sons, Inc.              
                                                            EC-06           3,841                  06/02/17   06/23/17    J.P. Daly & Sons, Inc.              
                                                            GC-1-01        30,675                  12/09/16   12/15/16    S.J. Hoerning Construction, Inc.    
                                                            GC-1-02         4,613                  01/26/17   01/31/17    S.J. Hoerning Construction, Inc.    
                                                            GC-1-03       -10,000                  01/26/17   01/31/17    S.J. Hoierning Construction, Inc.   
                                                            PC-01            -800                  12/09/16   12/15/16    Rocon Plumbing & Heating Corp.      
                                                            PC-02           3,910                  01/26/17   01/31/17    Rocon Plumbing & Heating Corp.      
                                                            PC-03           1,023                  02/24/17   03/03/17    Rocon Plumbing & Heating Corp.      
 

          Bus Garage:
05-1184   Reconstruction               5-007-005  07/05/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0415   Reconstruction               5-007-006  03/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0830   Reconstruction               5-007-007  05/11/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0073   Reconstruction               5-007-008  10/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-14            -565                  02/28/14   03/13/14    Renu Contracting & Restoration, Inc.
                                                            GC-15           3,100                  08/26/14   10/03/14    Renu Contracting & Restoration, Inc.
                                                            SC-1          -38,400                  02/28/14   03/13/14    Fasco Asphalt Paving, Inc.          
                                                            gc-5             -500                  01/28/14   07/18/14    renu contracting                    
 
12-0167   Reconstruction               5-007-009  10/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4-2          9,034                  10/28/13   12/10/13    Arrow Steel Window Corp.            
                                                            GC-4-4        -34,456                  08/26/14   10/03/14    Arrow Steel Window Corp.            
 
16-2044   Reconstruction               5-007-010  11/22/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          36,776                  01/09/23   11/15/23    HIRSCH & CO LLC                     
                                                            PC-06          34,454                  01/09/23   11/15/23    HIRSCH & CO LLC                     
 

          Wyandanch Public Library:
06-0826   Additions and Alterations    6-008-002  01/31/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0412   Reconstruction               6-008-003  09/30/08  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0163   Additions and Alterations    6-008-004  08/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
13-0877   Reconstruction               7-999-003  04/09/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Forest Park Elementary School:
18-1831   Reconstruction               8-012-L01  12/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE

THREE VILLAGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Setauket Elementary School:
91-1230   Reconstruction               0-001-008  05/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0705   Reconstruction               0-001-009  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0569   Reconstruction               0-001-010  02/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1096   Additions and Alterations    0-001-011  05/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0301   Reconstruction               0-001-012  11/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1060   Reconstruction               0-001-013  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0788   Reconstruction               0-001-014  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1212   Reconstruction               0-001-015  05/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0827   Reconstruction               0-001-016  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0179   Additions and Alterations    0-001-019  04/15/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,964                  02/27/03   03/04/03    Rockmore Contracting                
                                                            1              36,992                  02/14/04   03/02/04    Stalco Construction                 
                                                            1              -4,418                  02/14/04   03/05/04    WHM Plumbing                        
                                                            1               6,575                  04/29/04   05/07/04    JVR Electric                        
                                                            1             -56,396                  08/10/04   10/06/04    Metropolitan Roofing Systems        
                                                            1             -18,904                  12/21/04   12/30/04    Reel Mech.                          
                                                            1              -2,000                  11/17/05   11/23/05    ICAS Corp                           
                                                            2               2,776                  07/02/04   07/13/04    WHM Plumbing                        
                                                            2             -11,000                  07/13/05     /  /      Metropolitan Roofing systems        
                                                            3              -6,490                  05/17/06   08/08/06    Metropolitan Roofing                
 
98-0574   Reconstruction               0-001-020  02/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5              13,598                  11/10/99   12/01/03    Commercial Wiring                   
 
98-1366   Reconstruction               0-001-021  07/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0954   Reconstruction               0-001-024  03/27/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1212   Reconstruction               0-001-025  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1596   Reconstruction               0-001-026  10/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -21,438                  02/06/09   05/21/09    EXCEL BUILDERS GROUP, INC.          
                                                            TWO            -1,599                  04/01/09   07/29/09    EXCEL BUILDERS GROUP INC            
 
06-0775   Reconstruction               0-001-027  02/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -4,071                  03/21/08     /  /      A. ULIANO & SON. LTD.               
 
08-0464   Reconstruction               0-001-028  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0032   Reconstruction               0-001-029  12/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1238   Reconstruction               0-001-030  06/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0757   Reconstruction               0-001-031  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1418   Reconstruction               0-001-032  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1024   Reconstruction               0-001-033  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0739   Reconstruction               0-001-034  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0469   Reconstruction               0-001-035  06/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1            -192,000                  01/26/18   02/13/18    Arrow Steel Window Corp.            
                                                            6             -20,500                  12/20/18   02/12/19    ARROW STEEL WINDOW CORP.            
 
16-2056   Reconstruction               0-001-036  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0388   Reconstruction               0-001-037  04/05/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0508   Reconstruction               0-001-038  07/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  05/05/20   07/02/20    RELLE ELECTRIC CORP.                
 
18-1914   Reconstruction               0-001-039  07/09/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0657   Reconstruction               0-001-040  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1822FP Reconstruction               0-001-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nassakeag Elementary School:
92-0706   Reconstruction               0-002-004  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0570   Reconstruction               0-002-005  02/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1097   Reconstruction               0-002-006  05/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1062   Reconstruction               0-002-007  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0789   Reconstruction               0-002-008  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1213   Reconstruction               0-002-009  05/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0828   Reconstruction               0-002-011  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0864   Reconstruction               0-002-012  03/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0811   Additions and Alterations    0-002-013  05/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,669                  01/22/02   03/04/02    Hutton Elec.                        
                                                            1               9,750                  03/04/02   04/30/02    Interworks Systems                  
                                                            1             -18,020                  03/22/02   04/18/02    Walsh Mech.                         
                                                            2               8,084                  01/06/03   01/06/03    Interworks Systems                  
                                                            4 (rev)        -5,919                  05/29/02   06/05/02    Quad Const.                         
                                                            5              12,879                  05/29/02   06/05/02    Interworks Systems                  
 
98-0575   Reconstruction               0-002-014  02/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              14,249                  11/10/99   12/02/03    Commercial Wiring                   
 
05-0955   Reconstruction               0-002-018  03/27/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1213   Reconstruction               0-002-019  04/02/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           240,000                  08/22/08   03/10/09    IRWIN CONTRACTING INC.              
                                                            ONE            19,150                  08/22/08   09/29/08    PALACE ELECTRICAL CONTRACTORS       
 
06-1597   Reconstruction               0-002-020  10/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0465   Reconstruction               0-002-021  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0033   Reconstruction               0-002-022  12/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1239   Reconstruction               0-002-023  06/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0758   Reconstruction               0-002-024  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1419   Reconstruction               0-002-025  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1025   Reconstruction               0-002-026  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0740   Reconstruction               0-002-027  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1379   Reconstruction               0-002-028  05/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -2,000                  12/22/14   12/31/14    C&M Door Controls                   
 
15-0470   Reconstruction               0-002-029  06/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -83,653                  01/26/18   02/13/18    Arrow Steel Window Corp.            
                                                            3             -26,000                  12/20/18   02/12/19    ARROE STEEL WINDOW CORP.            
 
16-2057   Reconstruction               0-002-030  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1380   Reconstruction               0-002-031  10/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,720                  10/28/19   10/28/19    CENTRAL AIR CORP.                   
                                                            E-1            -5,616                  12/20/18   02/12/19    SOUTH SHORE ELECTRIC, INC.          
 
17-0509   Reconstruction               0-002-032  07/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -6,542                  05/05/20   07/02/20    RELLE ELECTRIC CORP.                
 
19-0269   Reconstruction               0-002-033  01/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0658   Reconstruction               0-002-034  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0347   Reconstruction               0-002-035  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1824FP Reconstruction               0-002-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          W S Mount Elementary School:
92-0707   Reconstruction               0-006-006  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0571   Reconstruction               0-006-007  02/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0790   Alterations                  0-006-008  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1061   Reconstruction               0-006-009  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1214   Reconstruction               0-006-010  05/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0865   Reconstruction               0-006-011  03/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1631   Reconstruction               0-006-012  07/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0134   Additions and Alterations    0-006-013  11/14/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,945                  11/12/02   12/23/02    Botto Mech.                         
                                                            1              16,744                  02/27/03   03/11/03    Delcon Elec.                        
                                                            1             -42,556                  02/27/03   03/11/03    JNS Heating                         
                                                            2                 687                  05/14/02   06/04/02    Nickerson Corp                      
                                                            2              18,768                  02/27/03   03/11/03    Delcon Elec.                        
                                                            2               3,267                  02/14/04   03/05/04    Botto Mech.                         
                                                            3               6,725                  03/11/04     /  /      Delcon Systems                      
                                                            4                -648                  04/02/03   04/17/03    Interworks Systems                  
                                                            6              41,122                  02/04/02   03/06/02    Quad Const.                         
                                                            7              19,272                  11/12/02   02/05/03    Quad Const.                         
 
98-0576   Reconstruction               0-006-014  02/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              15,339                  11/10/99   12/02/03    Commercial Wiring                   
 
05-0956   Reconstruction               0-006-018  03/27/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,000                  11/22/06   01/09/07    Pza Construction                    
 
07-1214   Reconstruction               0-006-019  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1598   Additions and Alterations    0-006-020  10/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0466   Reconstruction               0-006-021  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1240   Reconstruction               0-006-022  06/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -5,000                  03/31/11   04/28/11    DIAM-N-BLUE MECHANICAL              
                                                            TWO            -2,500                  11/08/10   11/12/10    A-1 CONSTRUCTION & RENOVATION       
 
10-0759   Reconstruction               0-006-023  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1420   Reconstruction               0-006-025  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1026   Reconstruction               0-006-026  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0741   Reconstruction               0-006-027  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0471   Reconstruction               0-006-028  06/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4             -17,970                  12/20/18   02/12/19    ARROW STEEL WINDOW CORP.            
 
16-2058   Reconstruction               0-006-029  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0711   Reconstruction               0-006-030  05/09/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1381   Reconstruction               0-006-031  10/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -2,000                  10/28/19   10/28/19    CENTRAL AIR CORP.                   
                                                            E-2            -4,681                  12/20/18   02/12/19    SOUTH SHORE ELECTRIC INC.           
 
19-0659   Reconstruction               0-006-032  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1825FP Reconstruction               0-006-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Arrowhead Lane Elementary:
92-0708   Reconstruction               0-007-005  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0572   Reconstruction               0-007-006  02/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1098   Reconstruction               0-007-007  05/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1063   Reconstruction               0-007-008  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0791   Reconstruction               0-007-009  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0866   Reconstruction               0-007-010  03/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0855   Additions and Alterations    0-007-011  05/12/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,500                  09/11/01   01/08/02    Bove Industries                     
                                                            1              14,971                  11/27/01   02/11/02    Eldor Elec.                         
                                                            1               2,025                  05/29/02   06/05/02    Majestic Plumbing                   
                                                            1               2,765                  05/29/02   06/05/02    Nickerson                           
                                                            10              4,977                  01/10/02   03/26/02    Italine                             
                                                            11             16,797                  01/10/02   03/26/02    Italine                             
                                                            12             14,775                  01/22/02   03/04/02    Italine                             
                                                            13             19,153                  11/12/02   02/05/03    Italine                             
                                                            14             18,634                  11/12/02   02/05/03    Italine                             
                                                            15             18,344                  11/12/02   02/05/03    Italine                             
                                                            16             18,542                  11/12/02   02/05/03    Italine                             
                                                            17             17,517                  03/16/05   04/14/05    Italine Inc                         
                                                            18             12,653                  03/16/05   06/23/05    Italine Inc                         
                                                            19            -17,500                  02/07/05   03/14/05    Italians Inc                        
                                                            2               2,570                  11/27/01   05/28/02    Eldor Elec.                         
                                                            2                 800                  05/29/02   06/05/02    Majestic Plumbing                   
                                                            2              13,229                  11/12/02   02/05/03    Walsh Mech.                         
                                                            3               9,015                  09/11/01   01/14/02    Italine                             
                                                            3               3,840                  11/27/01   02/11/02    Eldor Elec.                         
                                                            3              28,350                  12/10/01   02/28/02    Bove Industries                     
                                                            3               4,294                  11/12/02   02/05/03    Majestic Plumbing                   
                                                            4               8,751                  09/11/01   01/14/02    Italine                             
                                                            4               3,863                  01/10/02   03/26/02    Eldor Elec.                         
                                                            5               6,262                  09/11/01   01/14/02    Italine                             
                                                            5              19,558                  01/10/02   03/26/02    Eldor Elec.                         
                                                            6               4,792                  01/22/02   03/04/02    Italine                             
                                                            6              13,517                  05/29/02   06/05/02    Eldor Elec.                         
                                                            7              10,461                  12/10/01   02/28/02    Italine                             
                                                            8               4,558                  01/10/02   03/26/02    Italine                             
                                                            9              14,068                  01/10/02   03/26/02    Italine                             
 
98-0577   Reconstruction               0-007-012  02/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              15,339                  11/10/99   12/02/03    Commercial Wiring                   
 
01-0776   Reconstruction               0-007-014  04/01/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              14,450                  11/04/02   11/06/02    Valcro                              
                                                            2                 990                  02/27/03   03/04/03    Valcro                              
 
05-0180   Reconstruction               0-007-016  09/13/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0957   Reconstruction               0-007-017  03/27/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1215   Reconstruction               0-007-018  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1599   Additions and Alterations    0-007-019  10/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            THREE         -12,198                  04/01/09   07/29/09    EXCEL BUILDERS GROUP INC            
 
08-0467   Reconstruction               0-007-020  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0034   Reconstruction               0-007-021  12/17/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -37,920                  09/30/09   11/03/09    LASER INDUSTRIES INC                
                                                            TWO            -2,500                  06/17/10   08/05/10    LASER INDUSTRIES INC                
 
08-1241   Reconstruction               0-007-022  06/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0760   Reconstruction               0-007-023  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1421   Reconstruction               0-007-024  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1027   Reconstruction               0-007-025  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0742   Reconstruction               0-007-026  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1013   Reconstruction               0-007-027  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0051   Reconstruction               0-007-028  12/30/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2059   Reconstruction               0-007-029  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1382   Reconstruction               0-007-030  10/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              -4,500                  10/28/19   10/28/19    CENTRAL AIR CORP.                   
                                                            E-3            -5,737                  12/20/18   02/12/19    SOUTH SHORE ELECTRIC INC.           
 
17-0510   Reconstruction               0-007-031  07/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              22,186                  05/05/20   07/02/20    RELLE ELECTRIC CORP.                
 
19-0660   Reconstruction               0-007-032  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0623   Reconstruction               0-007-033  01/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1827FP Reconstruction               0-007-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Paul J Gelinas Junior High:
92-0709   Reconstruction               0-008-005  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0573   Reconstruction               0-008-006  02/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1099   Reconstruction               0-008-007  05/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0302   Reconstruction               0-008-008  11/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1064   Reconstruction               0-008-009  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0792   Reconstruction               0-008-010  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1215   Reconstruction               0-008-011  05/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0829   Reconstruction               0-008-012  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1632   Reconstruction               0-008-013  07/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1082   Reconstruction               0-008-014  04/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,000                  04/01/02   05/07/02    Palace Elec.                        
 
99-0642   Additions and Alterations    0-008-015  03/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,792                  03/22/02   04/18/02    Excel Mech.                         
                                                            1              -3,138                  05/29/02   06/05/02    Telsan Elec.                        
                                                            1               9,651                  01/26/04   02/18/04    HMJ Elec.                           
                                                            1              10,543                  04/15/04   04/28/04    Ambrosio Plumbing                   
                                                            2              -4,495                  02/14/04   02/26/04    JS McHugh Specialties               
 
98-1367   Reconstruction               0-008-016  07/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1205   Reconstruction               0-008-018  09/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0958   Reconstruction               0-008-021  03/27/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,000                  02/20/07   03/09/07    ECS mechanical Contracting          
 
06-0613   Reconstruction               0-008-022  12/28/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0468   Additions and Alterations    0-008-023  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1600   Reconstruction               0-008-024  10/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -3,400                  09/30/09   11/16/09    TELSAN ELECTRIC INC                 
                                                            TWO            -5,000                  08/22/08   10/07/08    JP DALY & SONS                      
 
07-1216   Reconstruction               0-008-025  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0035   Additions and Alterations    0-008-026  12/17/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            THREE          -5,000                  06/17/10   08/05/10    LASER INDUSTRIES INC                
 
08-1242   Additions and Alterations    0-008-027  06/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -78,000                  11/08/10   11/12/10    A-1 CONSTRUCTION & RENOVATION       
                                                            TWO            -2,000                  03/31/11   04/28/11    DIAM-N-BLUE MECHANICAL              
 
09-0653   Reconstruction               0-008-028  01/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0761   Reconstruction               0-008-029  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1028   Reconstruction               0-008-030  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1422   Reconstruction               0-008-031  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0743   Reconstruction               0-008-032  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1009   Reconstruction               0-008-033  06/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1008   Reconstruction               0-008-034  04/29/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1301   Reconstruction               0-008-035  04/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0052   Reconstruction               0-008-036  12/30/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,724                  05/16/16   05/19/16    JNS HEATING AND CONTRACTING         
 
14-0265   Reconstruction               0-008-037  05/05/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2060   Reconstruction               0-008-038  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1383   Reconstruction               0-008-039  10/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              -7,500                  10/28/19   10/28/19    CENTRAL AIR CORP.                   
                                                            E-4            -5,740                  12/20/18   02/12/19    SOUTH SHORE ELECTRIC INC.           
 
17-0316   Reconstruction               0-008-040  01/03/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1325   Reconstruction               0-008-041  07/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              32,490                  02/22/19   03/13/19    STASI BROTHERS ASPHALT CORP.        
 
18-0445   Reconstruction               0-008-042  11/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,200                  09/26/19   12/13/19    ACL CONSTRUCTION CORP.              
 
19-1570   Reconstruction               0-008-043  06/08/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1821FP Reconstruction               0-008-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ward Melville Senior High:
93-0574   Reconstruction               0-009-009  02/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1100   Reconstruction               0-009-010  05/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0303   Reconstruction               0-009-011  11/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1065   Reconstruction               0-009-012  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0793   Reconstruction               0-009-013  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1216   Reconstruction               0-009-014  05/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0830   Reconstruction               0-009-015  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1633   Reconstruction               0-009-016  07/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1207   Additions and Alterations    0-009-018  07/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,660                  11/04/02   12/10/02    Constructamax, Inc.                 
                                                            1             -25,655                  04/14/03   04/17/03    ARA Plumbing Heating Corp           
                                                            1              -1,521                  04/14/03   04/17/03    Roland's Electric Inc               
                                                            1              -9,879                  02/14/04     /  /      Air Design Inc                      
                                                            2              19,751                  11/04/02   12/10/02    Constructamax, Inc.                 
                                                            3               4,810                  02/05/02   04/01/02    Interworks Systems Inc              
 
99-1083   Reconstruction               0-009-019  04/20/00  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1368   Reconstruction               0-009-020  07/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0305   Reconstruction               0-009-021  02/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,672                  02/27/03   03/11/03    WHM Plumbing                        
                                                            1              10,168                  07/15/03   07/23/03    Phoenix Environ. Tech.              
                                                            1              49,800                  09/16/03   09/23/03    Rockmore Contracting                
                                                            1               8,450                  09/18/03   10/03/03    McDowell Elec.                      
                                                            2               2,883                  09/16/03   09/23/03    Phoenix Environ. Tech.              
                                                            2               7,650                  09/18/03   10/03/03    WHM Plumbing                        
                                                            2               4,346                  05/05/04   05/05/04    McDowell Elec.                      
                                                            2              16,418                  07/02/04   07/27/04    Rockmore Contracting                
                                                            3                -488                  01/26/04   03/17/04    McDowell Elec.                      
                                                            3              10,426                  07/02/04   07/27/04    Rockmore Contracting                
                                                            4              14,780                  05/05/04   05/05/04    McDowell Elec.                      
                                                            5               6,760                  04/29/04   05/05/04    McDowell Elec.                      
 
03-0397   Reconstruction               0-009-022  03/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,000                  10/26/04   10/28/04    Adjo Contracting                    
                                                            2              19,992                  04/13/05   06/07/05    Adjo Contracting Corp               
 
05-0191   Reconstruction               0-009-025  10/18/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  07/31/06   12/18/06    walsh Mechanical  Contractors       
 
05-0187   Reconstruction               0-009-026  09/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0959   Reconstruction               0-009-027  03/27/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1217   Additions and Alterations    0-009-028  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1601   Additions and Alterations    0-009-029  10/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0469   Reconstruction               0-009-030  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1243   Reconstruction               0-009-031  06/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0036   Additions and Alterations    0-009-032  12/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0654   Reconstruction               0-009-033  01/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0762   Reconstruction               0-009-034  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1029   Reconstruction               0-009-035  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0744   Reconstruction               0-009-036  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1010   Reconstruction               0-009-037  06/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1302   Reconstruction               0-009-038  04/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0053   Reconstruction               0-009-039  12/30/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              23,379                  05/16/16   05/19/16    JNS HEATING SERVICE                 
                                                            One            80,000                  02/19/16   04/19/16    Irwin Contracting, Inc.             
                                                            One            21,949                  02/19/16   02/29/16    WHM Plumbing and Heating            
 
14-1726   Reconstruction               0-009-040  07/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2061   Reconstruction               0-009-041  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1326   Reconstruction               0-009-042  09/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              43,811                  01/02/18   01/23/18    Renu Contracting & Restoration      
                                                            1               3,900                  01/02/18   01/31/18    Thermo Tech Combustion              
                                                            1              56,062                  05/16/18   05/18/18    JP DALY & SONS, INC.                
 
16-0384   Reconstruction               0-009-043  01/23/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1939   Reconstruction               0-009-044  12/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              24,900                  08/29/19   08/30/19    ACL CONSTRUCTION CORP.              
 
18-0568   Reconstruction               0-009-045  11/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               2,520                  09/26/19   09/27/19    ACL CONSTRUCTION CORP.              
 
18-2168   Reconstruction               0-009-046  07/19/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0661   Reconstruction               0-009-047  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0855   Reconstruction               0-009-048  06/22/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0402   Reconstruction               0-009-049  12/11/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              47,852                  09/05/23   01/08/24    CORPORATE ELECTRICAL TECH           
 
20-0820   Reconstruction               0-009-050  03/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1819FP Reconstruction               0-009-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Minnesauke Elementary:
92-0710   Reconstruction               0-014-007  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1101   Reconstruction               0-014-008  05/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1066   Reconstruction               0-014-009  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0794   Reconstruction               0-014-010  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1217   Reconstruction               0-014-011  05/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1634   Reconstruction               0-014-012  07/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0433   Additions and Alterations    0-014-013  01/10/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,426                  01/10/02   03/22/02    Tromel Const.                       
                                                            1              -3,853                  07/02/04   07/12/04    Snow Industries                     
                                                            1             -24,315                  04/13/05   04/26/05    DiFrancia Electric                  
                                                            10             -5,000                  06/30/05   07/19/05    Tromel Construction                 
                                                            2               9,812                  01/10/02   03/22/02    Tromel Const.                       
                                                            3              25,610                  05/29/02   05/30/02    HVAC, Inc                           
                                                            3              28,784                  11/12/02   02/05/03    Tromel Const.                       
                                                            4              28,669                  11/12/02   02/05/03    Tromel Const.                       
                                                            5              22,615                  11/12/02   02/05/03    Tromel Const.                       
                                                            6              19,999                  05/29/02   05/30/02    Tromel Const.                       
                                                            6A             19,999                  05/29/02   05/30/02    Tromel Const.                       
                                                            7              17,848                  05/29/02   05/30/02    Tromel Const.                       
                                                            8              18,914                  05/29/02   05/30/02    Tromel Const.                       
                                                            9              15,101                  11/12/02   02/05/03    Tromel Const.                       
 
98-0578   Reconstruction               0-014-014  02/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              13,622                  11/10/99   12/02/03    Commercial Wiring                   
 
05-0960   Reconstruction               0-014-017  03/27/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1218   Reconstruction               0-014-018  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1602   Reconstruction               0-014-019  10/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0470   Reconstruction               0-014-020  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1244   Reconstruction               0-014-021  06/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0763   Reconstruction               0-014-022  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1423   Reconstruction               0-014-023  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1030   Reconstruction               0-014-024  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0745   Reconstruction               0-014-025  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1014   Reconstruction               0-014-026  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1380   Reconstruction               0-014-027  05/06/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0472   Reconstruction               0-014-028  06/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            5             -17,400                  12/20/18   02/12/19    ARROW STEEL WINDOW CORP.            
 
16-2062   Reconstruction               0-014-029  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1384   Reconstruction               0-014-030  10/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5               4,218                  10/28/19   10/28/19    CENTRAL AIR CORP.                   
                                                            E-5             9,091                  12/20/18   02/12/19    SOUTH SHORE ELECTRIC INC.           
 
17-0511   Reconstruction               0-014-031  07/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              10,271                  05/05/20   07/02/20    RELLE ELECTRIC CORP.                
 
19-0662   Reconstruction               0-014-032  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1826FP Reconstruction               0-014-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Murphy Jr. High School:
91-0942   Reconstruction               0-015-006  04/02/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0711   Reconstruction               0-015-007  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0575   Reconstruction               0-015-008  02/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0795   Reconstruction               0-015-009  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1067   Reconstruction               0-015-010  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0831   Reconstruction               0-015-011  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1084   Reconstruction               0-015-012  04/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              10,560                  12/30/02   02/13/03    ICAS Corp                           
                                                            5                -600                  12/05/02   02/05/03    ICAS Corp                           
 
99-0643   Additions and Alterations    0-015-013  03/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,678                  01/26/04   02/18/04    HMJ Elec.                           
                                                            1              -4,495                  02/14/04   02/26/04    JS McHugh Specialties               
                                                            1               6,168                  04/15/04   04/28/04    Ambrosio Plumbing                   
 
98-1369   Reconstruction               0-015-014  07/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1206   Reconstruction               0-015-015  09/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0192   Reconstruction               0-015-018  10/18/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0961   Reconstruction               0-015-019  03/27/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0614   Reconstruction               0-015-020  12/28/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1219   Additions and Alterations    0-015-021  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1603   Reconstruction               0-015-022  10/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             5,000                  08/22/08   09/29/08    JP DALY & SONS                      
                                                            ONE            -4,167                  09/30/09   11/16/09    TELSAN ELECTRIC INC                 
 
08-0471   Reconstruction               0-015-023  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0037   Additions and Alterations    0-015-024  12/17/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FOUR           -5,000                  06/17/10   08/05/10    LASER INDUSTRIES INC                
 
08-1245   Additions and Alterations    0-015-025  06/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -6,767                  02/07/11   02/23/11    DF STONE CONTRACTING LTD            
                                                            THREE          -3,000                  03/31/11   04/28/11    DIAM-N-BLUE MECHANICAL              
 
09-0655   Reconstruction               0-015-026  01/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0764   Reconstruction               0-015-027  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1031   Reconstruction               0-015-028  07/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1424   Reconstruction               0-015-029  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0746   Reconstruction               0-015-030  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1011   Reconstruction               0-015-031  06/04/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -5,000                  01/15/15   02/03/15    JP Daly & Sons, Inc.                
 
13-1303   Reconstruction               0-015-032  04/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1522   Reconstruction               0-015-033  06/11/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0054   Reconstruction               0-015-034  12/30/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              18,724                  05/16/16   05/19/16    JNS HEATING SERVICE                 
 
16-2063   Reconstruction               0-015-035  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1385   Reconstruction               0-015-036  10/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6              -7,500                  10/28/19   10/28/19    CENTRAL AIR CORP.                   
                                                            E-6            -7,500                  12/20/18   02/12/19    SOUTH SHORE ELECTRIC INC.           
 
18-0446   Reconstruction               0-015-037  11/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -11,000                  09/26/19   12/13/19    ACL CONSTRUCTION CORP.              
 
19-0663   Reconstruction               0-015-038  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0395   Reconstruction               0-015-039  11/20/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1820FP Reconstruction               0-015-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Country Admin Ctr-NoAidBldg:
92-0712   Reconstruction               0-018-005  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0796   Reconstruction               0-018-006  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0867   Reconstruction               0-018-007  03/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1220   Reconstruction               0-018-011  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0472   Reconstruction               0-018-013  03/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1824   Reconstruction               0-018-014  09/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -10,000                  11/27/09   12/24/09    LIPSKY ENTERPRISES INC              
 
10-0765   Reconstruction               0-018-015  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1032   Reconstruction               0-018-016  07/01/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -6,482                  10/08/14   10/20/14    Baltray Enterprises                 
 
11-1425   Reconstruction               0-018-017  08/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1130   Reconstruction               0-018-018  05/22/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             6,609                  11/06/13   11/22/13    PROTON CONSTRUCTION CORP            
 
13-0747   Reconstruction               0-018-019  10/17/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0391   Reconstruction               0-018-020  02/02/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -8,000                  01/23/17   01/27/17    JNS Heating Service                 
 
15-0519   Reconstruction               0-018-021  03/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -7,700                  11/25/16   12/27/16    Metro Paving, LLC                   
 
16-2064   Reconstruction               0-018-022  01/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0664   Reconstruction               0-018-023  12/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1823FP Reconstruction               0-018-FP1  06/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mount El. Sch. Mod 1 Child Care:
98-0908   New Construction             0-020-001  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular 1 @ Setauket (Child Care):
98-0907   New Construction             0-022-001  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular 2 @ Setauket Child Care:
98-0909   New Construction             0-023-001  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXNassakeag Portable Class Demolitio:
98-0910   New Construction             0-024-001  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0726   Reconstruction               0-024-002  01/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular 1 @ Minnesauke (Child Care):
98-0911   New Construction             0-025-001  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular @ Nassakeag (Child Care):
98-0912   New Construction             0-026-001  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular 2 @ Minnesauke Storage:
98-0913   New Construction             0-027-001  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular @ Arrowhead (Child Care):
99-1621   New Construction             0-028-001  07/11/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,300                  09/11/01   04/10/02    Resun Leasing                       
 

          XXXMt. Portables:
96-0868   Reconstruction               1-004-001  03/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXXMaintenance & Operations (demo'd):
96-0832   Reconstruction               1-005-002  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg.:
96-0833   Reconstruction               1-012-005  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1370   Reconstruction               1-012-006  07/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0615   Reconstruction               1-012-009  12/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 

          40' Container #1 @ PJ Gelinas:
09-1052   Reconstruction               2-036-001  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Bldg-new Auto Shop Bldg:
07-1859   New Construction             3-032-001  09/22/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Building:
14-0025   New Construction             3-071-001  11/20/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            One             2,667                  01/22/16   04/19/16    Palace Electric                     
                                                            One             4,911                  02/19/16   12/28/16    JNS Heating Service, Inc.           
                                                            One             4,911                  02/19/16     /  /      JNS Heating Service, Inc.           
 

          Stadium - Melville HS:
96-0140   New Construction             7-019-001  08/08/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Refreshment Stand:
02-0250   New Construction             7-030-001  09/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
02-0185   Reconstruction               7-999-003  12/02/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  06/30/05   07/07/05    CBS Whitcom Tech                    
 
08-0456   Reconstruction               7-999-004  12/11/08  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0231   Reconstruction               7-999-005  09/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0316EP Energy Project               7-999-E01  10/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE

BROOKHAVEN-COMSEWOGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-03-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Terryville Elementary:
92-0239   Reconstruction               0-002-004  09/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1546   Reconstruction               0-002-005  06/02/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1138   Reconstruction               0-002-006  04/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1680   Reconstruction               0-002-007  07/10/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1679   Reconstruction               0-002-008  07/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0222   Reconstruction               0-002-009  09/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0858   Reconstruction               0-002-011  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4-1            41,376                  10/22/04   01/04/05    Adjo Contracting                    
                                                            G1-1            4,328                  11/23/05   02/15/06    Baruti Construction Corp            
 
04-0062   Reconstruction               0-002-012  04/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1538   Reconstruction               0-002-013  06/13/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 867                  06/02/08   08/08/08    Eldor Contracting Corp.             
                                                            1              -3,040                  11/04/08   02/19/09    JNS HEATING SERVICES, INC.          
 
07-0440   Reconstruction               0-002-014  03/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,501                  10/06/08   03/10/09    STALCO CONSTRUCTION CORP.           
                                                            1              60,000                  10/06/08   03/10/09    SARACINO CONSTRUCTION CORP.         
                                                            1              33,428                  02/24/09   06/11/09    ROLANDS ELECTRIC INC.               
                                                            1               2,012                  08/20/09   09/11/09    AMBROSIO HEATING                    
                                                            1               1,695                  12/21/09   01/07/11    PALACE ELECTRICAL CONTRACTORS       
                                                            2              -4,173                  12/16/08   05/08/09    STALCO CONSTRUCTION CORP.           
                                                            2              10,881                  10/30/09   12/29/09    ROLAND'S ELECTRIC INC               
                                                            2               3,862                  01/25/10   05/27/10    AMBROSIO & COMPANY                  
                                                            3              -4,595                  12/21/09   01/07/11    STALCO CONSTRUCTION CORP            
 
09-0614   Reconstruction               0-002-015  01/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,000                  07/01/10   09/02/10    VEZANDIO CONTRACTING CORP           
 
11-0902   Reconstruction               0-002-016  03/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0306   Alterations                  0-002-017  06/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,306                  08/12/16   09/30/16    Arrow Steel Window Corp             
                                                            1                -434                  09/22/16   10/31/16    QG Mechanical Services Co.          
                                                            1              -7,550                  03/16/18   03/29/18    QG Mechanical Service Co.           
                                                            2              -5,150                  01/29/18   03/08/18    QG Mechanical Service Co.           
 
18-1161   Reconstruction               0-002-018  02/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,444                  02/10/20   06/08/20    PIONEER LANDSCAPING & ASPHALT PAVING
                                                            1              -2,499                  09/23/20   11/06/20    DOMINION CONSTRUCTION CORP.         
                                                            1               1,376                  11/12/20   02/16/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            1                -258                  12/09/20   03/10/21    RENU CONTRACTING & RESTORATION      
 
19-0708   Reconstruction               0-002-019  01/07/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,400                  01/26/21   03/18/21    STATEWIDE ROOFING, INC.             
                                                            1              -6,288                  03/02/21   04/19/21    ELDOR CONTRACTING CORP.             
                                                            1             -11,566                  05/25/21   07/15/21    RENU CONTRACTING & RESTORATION, INC 
                                                            1             -10,000                  08/03/21   04/07/22    HIRSCH&CO, LLC                      
                                                            2              16,240                  03/02/21   06/17/21    STATEWIDE ROOFING, INC.             
                                                            3              22,988                  04/15/21   05/25/21    STATEWIDE ROOFING, INC.             
 
20-0801   Reconstruction               0-002-020  03/28/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,054                  04/06/22   03/07/23    Ambrosio&Comp Inc                   
                                                            1                 657                  09/12/22   08/22/23    Renu Contrting                      
                                                            1              -7,000                  09/12/22   05/31/23    Palace Elec Contrs Inc              
                                                            1              -8,873                  11/15/22   07/25/23    SUNATION SOLAR SYSTEMS              
 
21-0637   Reconstruction               0-002-021  03/22/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,820                  02/17/23     /  /      CROSSROADS CONST                    
                                                            1             -15,000                  02/17/23     /  /      BYRNE & SON IRRIGATION INC          
 
02-0482FP Reconstruction               0-002-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0776SC Visual Structural Inspection 0-002-SC1  12/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1531   Visual Structural Inspection 0-002-SC2  05/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          John F Kennedy Jr. Middle:
99-1668   Reconstruction               0-003-003  06/14/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-02 rev        6,540                  07/12/02   07/24/02    Northeast Atlas Const.              
 
00-1913   Reconstruction               0-003-004  11/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            36,242                  08/15/02   10/28/02    Statewide Roofing                   
 
12-1194   Reconstruction               0-003-007  07/16/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -12,184                  04/03/14   07/03/14    Advanced Sound                      
 
03-0859   Reconstruction               0-003-008  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             287                  05/16/05   06/07/05    Gordon Seaman Inc                   
                                                            EC-01             288                  05/16/05   06/07/05    Gordon Seaman Inc                   
                                                            G1-2            9,000                  09/20/06   10/19/06    Baruti Construction                 
                                                            H-3A            3,510                  06/18/07   08/07/07    HVAC Inc                            
                                                            RC-2           17,700                  08/02/06   08/14/06    Best Roofing                        
                                                            SC1-1          26,000                  10/07/05   10/17/05    The Landtek Group                   
 
04-0063   Reconstruction               0-003-009  04/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0552   Reconstruction               0-003-010  03/31/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-1            -5,000                  01/18/07   02/01/07    Long Island Mechanical              
 
05-0962   Additions and Alterations    0-003-011  05/25/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1               816                  11/20/06   03/23/07    Eldor Contracting                   
                                                            H-1             1,397                  02/16/07   03/09/07    HVAC INc                            
                                                            P-1            -3,100                  01/26/07   01/30/07    Lynbrook Plumbing                   
 
07-0441   Reconstruction               0-003-012  03/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              28,000                  10/06/08   03/10/09    STALCO CONSTRUCTION CORP.           
                                                            1               3,250                  02/24/09   06/11/09    AMBROSIO & COMPANY                  
                                                            1              24,250                  04/13/09     /  /      ROLAND'S ELECTRIC INC               
                                                            1             -20,000                  08/20/09   09/11/09    JNS HEATING                         
                                                            1               8,625                  12/21/09   01/07/11    PALACE ELECTRICAL CONTRACTORS       
                                                            2              12,079                  12/16/08   05/08/09    STALCO CONSTRUCTION CORP.           
                                                            2              23,654                  04/13/09     /  /      ROLAND'S ELECTRIC INC               
                                                            2               5,167                  08/20/09   09/11/09    AMBROSIO & COMPANY                  
                                                            2              -7,679                  10/30/09   12/29/09    JNS HEATING SERVICES INC            
                                                            2              14,055                  12/21/09   01/07/11    PALACE ELECTRICAL CONTRACTORS       
                                                            3             -14,538                  02/24/09   07/07/09    STALCO CONSTRUCTION CORP.           
                                                            3               2,000                  03/15/10   05/10/10    PALACE ELECTRICAL CONTRACTORS       
                                                            4              -3,401                  12/21/09   01/07/11    STALCO CONSTRUCTION CORP            
 
11-0903   Reconstruction               0-003-013  03/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1409   Reconstruction               0-003-014  08/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  08/07/20   09/25/20    ARROW STEEL WINDOW CORP.            
 
16-1410   Reconstruction               0-003-015  07/28/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,226                  05/20/21   08/13/21    L.E.B. ELECTRIC                     
 
17-1598   Reconstruction               0-003-016  05/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,129                  02/21/19   03/12/19    MORE CONSULTING CORP.               
 
18-1249   Reconstruction               0-003-017  04/09/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,438                  02/10/20   06/08/20    AUSTIN INTERIORS, INC.              
                                                            2              39,525                  07/03/20   08/12/20    AUSTIN INTERIORS, INC.              
                                                            3              36,617                  12/09/20   02/25/21    AUSTIN INTERIORS, INC.              
 
18-1162   Reconstruction               0-003-018  02/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,800                  08/07/20   10/07/20    DOMINION CONSTRUCTION CORP.         
                                                            1               3,643                  11/12/20   02/16/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            1              -7,932                  12/09/20   02/24/21    RENU CONTRACTING & RESTORATION      
 
19-0709   Reconstruction               0-003-020  01/07/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  09/23/20   11/27/20    LASER INDUSTRIES, INC.              
                                                            1               4,722                  12/09/20   02/23/21    ELDOR CONTRACTING CORP.             
                                                            1             -15,420                  06/22/21   03/14/22    Renu Contracting & Restoration      
                                                            1              -4,543                  10/06/21   11/16/22    Hirsch&Co, LLC                      
                                                            1R              4,722                  11/09/21   09/06/22    Eldor Contracting Corp              
                                                            2R             34,500                  11/09/21   09/06/22    Eldor Contracting Corp              
 
20-0802   Reconstruction               0-003-021  03/28/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               6,407                  12/06/21   12/21/22    Laser Ind Inc                       
                                                            1              -6,134                  04/06/22   03/07/23    Ambrosio&Comp Inc                   
                                                            1               8,500                  09/12/22   05/31/23    Palace Elec Contrs Inc              
                                                            1               1,090                  11/15/22   12/07/23    RENU CONTRACTING & RESTORATION INC  
                                                            2             -16,152                  11/15/22   12/07/23    RENU CONTRACTING & RESTORATION INC  
 
21-0638   Reconstruction               0-003-022  03/22/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             179,000                  11/15/22   12/19/23    CROSSROADS CONSTRUCTION             
                                                            1              44,948                  11/15/22   07/25/23    ROLANDS ELECTRIC INC                
                                                            1             -11,159                  02/17/23   11/27/23    BYRNE & SON IRRIGATION INC          
                                                            1R             -3,280                  03/31/23   12/21/23    JNS HEATING SERVICE                 
                                                            2              -2,176                  02/17/23   12/14/23    CROSSROADS CONST                    
                                                            2             135,032                  09/01/23   12/29/23    ROLANDS ELECTRIC INC                
 
21-1350   Reconstruction               0-003-023  05/23/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,110                  02/17/23   12/14/23    CROSSROADS CONSTRUCTION CORP        
 
93-0264EP Energy Project               0-003-E01  11/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0479FP Reconstruction               0-003-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0773SC Visual Structural Inspection 0-003-SC1  12/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1532SC Visual Structural Inspection 0-003-SC2  05/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Norwood Avenue Elem. School:
00-1914   Reconstruction               0-004-004  11/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0860   Reconstruction               0-004-007  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3-1            17,595                  10/22/04   10/28/04    ADJO Contracting                    
                                                            3-2           112,000                  12/16/04   01/04/05    ADJO Contracting                    
                                                            SC-3           32,400                  01/21/05   01/24/05    ADJO Contracting                    
 
04-0064   Reconstruction               0-004-008  04/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0442   Reconstruction               0-004-009  03/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,693                  10/06/08   03/10/09    STALCO CONSTRUCTION CORP.           
                                                            1               6,150                  02/24/09   07/07/09    ARROW STEEL WINDOW CORP.            
                                                            1               3,168                  08/20/09   09/11/09    AMBROSIO & COMPANY                  
                                                            1               2,135                  12/21/09   01/07/11    PALACE ELECTRICAL CONTRACTORS       
                                                            2              -2,460                  12/21/09   01/07/11    STALCO CONSTRUCTION CORP            
                                                            2               2,500                  03/15/10   05/10/10    PALACE ELECTRICAL CONTRACTORS       
 
11-0904   Reconstruction               0-004-010  03/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1208   Reconstruction               0-004-011  05/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  07/23/13   07/25/13    QG Mechanical                       
 
13-1182   Reconstruction               0-004-012  04/14/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,250                  10/14/14   10/23/14    Fasco Asphalt Paving, Inc.          
                                                            1               1,600                  01/20/15   01/27/15    Arrow Steel Window Corp.            
 
18-1250   Reconstruction               0-004-013  04/09/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,053                  02/10/20   06/08/20    AUSTIN INTERIORS, INC.              
 
18-1163   Reconstruction               0-004-014  02/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,000                  09/23/20   11/06/20    DOMINION CONSTRUCTION CORP.         
                                                            1                -286                  11/12/20   02/16/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            1             -10,000                  12/09/20   03/10/21    RENU CONTRACTING & RESTORATION      
 
19-0710   Reconstruction               0-004-015  01/07/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              60,650                  09/23/20   11/27/20    LASER INDUSTRIES, INC.              
                                                            1              -6,952                  03/02/21   06/17/21    CARTER-MELENCE, INC.                
                                                            1             -58,400                  05/25/21   07/15/21    RENU CONTRACTING & RESTORATION, INC 
                                                            1              -2,510                  08/03/21   04/07/22    HIRSCH&CO, LLC                      
                                                            1R             19,686                  11/09/21   09/06/22    Eldor Contracting Corp              
                                                            2               1,589                  10/06/21   11/16/22    Hirsch&Co, LLC                      
 
20-0803   Reconstruction               0-004-017  03/28/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              34,200                  05/24/22   04/20/23    Barrett Roofs Inc                   
                                                            1                   0                  09/12/22   08/22/23    Renu Contracting                    
                                                            1              -3,000                  09/12/22     /  /      Palace Elec Contrs Inc              
 
21-0639   Reconstruction               0-004-018  03/22/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              37,400                  11/15/22   07/25/23    ROLANDS ELECTRIC INC                
                                                            1              12,177                  02/17/23   12/14/23    CROSSROADS CONST                    
 
93-0265EP Energy Project               0-004-E01  11/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0483FP Reconstruction               0-004-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0777SC Visual Structural Inspection 0-004-SC1  12/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1533SC Visual Structural Inspection 0-004-SC2  05/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Boyle Road Elementary:
93-0614   Reconstruction               0-005-003  02/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1912   Reconstruction               0-005-005  11/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -3,000                  03/14/03   03/18/03    Sound Roof Systems                  
 
03-0861   Reconstruction               0-005-008  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-1            39,084                  10/22/04   10/28/04    ADJO Contracting                    
                                                            RC-3          -12,300                  08/02/06   08/21/06    Best Roofing of New jersey          
                                                            SC-2           26,964                  01/21/05   01/24/05    ADJO Contracting                    
 
04-0065   Reconstruction               0-005-009  04/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0443   Reconstruction               0-005-010  03/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,309                  10/06/08   03/10/09    STALCO CONSTRUCTION CORP.           
                                                            1               7,544                  10/06/08   03/10/09    STALCO CONSTRUCTION CORP.           
                                                            1              17,145                  02/24/09   06/11/09    ROLANDS ELECTRIC INC.               
                                                            1              -1,554                  08/20/09   09/11/09    AMBROSIO & COMPANY                  
                                                            1             -20,000                  08/20/09   09/11/09    JNS HEATING                         
                                                            1               4,745                  12/21/09   01/07/11    PALACE ELECTRICAL CONTRACTORS INC   
                                                            2              -4,960                  12/21/09   01/07/11    STALCO CONSTRUCTION CORP            
                                                            2                 500                  03/15/10   05/10/10    PALACE ELECTRICAL CONTRACTORS, INC. 
 
11-0905   Reconstruction               0-005-011  03/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1143   Reconstruction               0-005-012  07/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  04/03/14   04/24/14    Saracino Construction               
                                                            1              -5,000                  10/14/14   10/21/14    P & M Door, LLC                     
 
18-1164   Reconstruction               0-005-013  02/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,870                  08/07/20   10/07/20    DOMINION CONSTRUCTION CORP.         
                                                            1              -2,000                  11/12/20   02/16/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            1              -6,600                  12/09/20   02/24/21    RENU CONTRACTING & RESTORATION      
                                                            1R            256,305                  12/30/19   02/03/20    PIONEER LANDSCAPING & ASPHALT PAVING
                                                            2               4,364                  02/10/20   06/08/20    PIONEER LANDSCAPING & ASPHALT PAVING
 
19-0711   Reconstruction               0-005-015  01/07/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,824                  03/02/21   04/19/21    ELDOR CONTRACTING CORP.             
                                                            1             -15,000                  05/25/21   07/15/21    RENU CONTRACTING & RESTORATION, INC 
                                                            1              -8,351                  08/03/21   04/07/22    HIRSCH&CO, LLC                      
 
20-0804   Reconstruction               0-005-016  03/28/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  04/06/22   03/07/23    Ambrosio&Comp Inc                   
                                                            1             -10,500                  09/12/22   08/22/23    Renu Contracting                    
                                                            1              29,629                  09/12/22     /  /      Palace Elec Contrs Inc              
                                                            2              -1,380                  07/18/23   12/28/23    PALACE ELECTRICAL CONTRACTORS       
 
21-0640   Reconstruction               0-005-017  03/22/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  02/17/23   12/14/23    CROSSROADS CONST                    
                                                            1             -11,910                  02/17/23   11/27/23    BYRNE & SON IRRIGATION INC          
 
93-0266EP Energy Project               0-005-E01  11/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0480FP Reconstruction               0-005-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0774SC Visual Structural Inspection 0-005-SC1  12/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1534SC Visual Structural Inspection 0-005-SC2  05/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Comsewogue Senior High School:
94-1639   Reconstruction               0-010-002  07/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1545   Reconstruction               0-010-003  06/02/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1413   Reconstruction               0-010-004  05/19/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1419   Reconstruction               0-010-005  08/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1581   Reconstruction               0-010-006  08/20/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1772   Reconstruction               0-010-007  08/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0862   Reconstruction               0-010-011  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          -7,798                  12/18/06     /  /      Gordon Seaman                       
                                                            EQ-1            3,385                  02/16/06   06/02/06    H and E Equipment                   
                                                            G1-1            1,200                  02/17/05   03/02/05    Baruti Construction Corp            
                                                            G2-2           -9,289                  02/15/06   06/23/06    Baruti Construction                 
                                                            G2-3           15,000                  05/12/06   08/08/06    Baruti Construction                 
                                                            H-1            -1,200                  02/17/05   06/29/05    HVAC Inc                            
                                                            H-2            13,581                  06/16/05   07/20/05    HVAC Inc                            
                                                            H-2            10,071                  06/18/07     /  /      HVAC Inc                            
                                                            H-3              -564                  06/09/06   11/30/06    HVAC Inc                            
                                                            P-1             5,458                  12/30/05     /  /      Hirsch Co                           
                                                            P-2             6,656                  05/12/06   10/12/06    Hirsch Co                           
                                                            RC-1          -40,500                  06/09/06   07/26/06    best Roofing Of new York            
                                                            RC-4          -35,700                  08/02/06   08/21/06    Best Roofing                        
                                                            SC-1-2         30,000                  11/04/05   02/13/06    THOMAS ASSOCIATES                   
                                                            SC-2-3         26,346                  11/03/05   02/13/06    THOMAS ASSOCIATES                   
                                                            SC1-3           1,885                  04/14/06   06/23/06    The Landtek Group                   
                                                            SC1-4         -15,000                  05/12/06   08/08/06    The Landtek Group                   
 
04-0066   Reconstruction               0-010-012  04/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0658   Reconstruction               0-010-013  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-1               370                  02/16/07   03/09/07    ARA Mechanical Corp                 
 
05-0963   Additions and Alterations    0-010-014  05/25/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0444   Reconstruction               0-010-015  03/10/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,817                  11/04/08     /  /      ROLAND'S ELECTRIC INC.              
                                                            1              55,500                  11/04/08   12/02/08    H & A CONTRACTING CORP.             
                                                            1               5,455                  08/20/09   09/11/09    AMBROSIO & COMPANY                  
                                                            1             -20,000                  08/20/09   09/11/09    JNS HEATING                         
                                                            1              17,103                  12/21/09   01/07/11    PALACE ELECTRICAL CONTRACTORS       
                                                            1              15,542                  01/25/10   05/27/10    ARROW STEEL WINDOWS CORP            
                                                            2               2,347                  12/16/08   03/06/09    ROLAND'S ELECTRIC INC.              
                                                            2              -8,597                  08/20/09   09/11/09    AMBROSIO & COMPANY                  
                                                            2              -8,175                  10/30/09   12/29/09    STALCO CONSTRUCTION CORP            
                                                            2               1,070                  04/15/10   05/10/10    PALACE ELECTRICAL CONSTRACTORS      
                                                            2              15,612                  03/22/11   04/08/11    H&A CONTRACTING CORP                
                                                            3               2,353                  02/24/09   06/11/09    ROLANDS ELECTRIC INC.               
                                                            3              12,000                  10/30/09   12/29/09    STALCO CONSTRUCTION CORP            
                                                            3              -4,300                  03/22/11   04/08/11    H&A CONTRACTING CORP                
                                                            3               8,597                  07/26/11   10/21/11    AMBROSIO & COMPANY                  
                                                            4               7,592                  10/30/09   12/29/09    ROLAND'S ELECTRIC INC               
                                                            4              -3,511                  04/26/10   08/17/10    STALCO CONSTRUCTION CORP            
 
10-1011   Reconstruction               0-010-016  05/31/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              20,809                  12/19/11     /  /      K.J.B. INDUSTRIES INC               
 
11-0906   Reconstruction               0-010-017  03/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0910   Reconstruction               0-010-018  03/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -5,000                  02/27/17   07/14/17    Young Equipment Sale, Inc.          
 
14-0307   Reconstruction               0-010-019  06/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1R            -10,000                  02/29/16   03/07/16    Pioneer Landscaping & Asphalt Paving
 
16-1456   Reconstruction               0-010-021  06/20/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  12/14/18   01/15/19    PIONEER LANDSCAPING & ASPHALT PAVING
                                                            1                -707                  11/07/19   11/08/19    L.E.B. ELECTRIC, LTD.               
                                                            1R             33,500                  03/16/18   03/20/18    The Land Tek Group Inc.             
                                                            2             -15,000                  06/25/18   07/24/18    THE LAND TEK GROUP INC              
 
18-1165   Reconstruction               0-010-022  02/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -384                  09/23/20   11/06/20    DOMINION CONSTRUCTION CORP.         
                                                            1               3,330                  11/12/20   02/16/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            1             -15,050                  12/09/20   02/24/21    RENU CONTRACTING & RESTORATION      
 
19-0713   Reconstruction               0-010-023  01/07/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  03/02/21   06/17/21    CARTER-MELENCE, INC.                
                                                            1             -10,000                  03/02/21   04/19/21    ELDOR CONTRACTING CORP.             
                                                            1              -8,440                  05/25/21   07/15/21    RENU CONTRACTING & RESTORATION, INC 
                                                            1                -802                  08/03/21   04/07/22    HIRSCH&CO, LLC                      
                                                            2                 665                  10/06/21   11/16/22    Hirsch&Co, LLC                      
 
20-0805   Reconstruction               0-010-024  03/28/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              61,649                  12/06/21   12/21/22    Laser Inds Inc                      
                                                            1              -3,958                  04/06/22   03/07/23    Ambrosio&Comp Inc                   
                                                            1              59,780                  05/31/22   04/10/23    Dominion Const Corp                 
                                                            1              -3,838                  11/15/22   12/07/23    RENU CONTRACTING                    
                                                            1              -9,345                  11/15/22   07/25/23    PALACE ELECTIRICAL CONTRACTOES INC  
                                                            2              49,413                  12/06/21   12/20/22    Laser Ins Inc                       
                                                            3              31,950                  12/06/21   12/20/22    Laser Inds Inc                      
 
20-0442   Reconstruction               0-010-025  12/03/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             183,620                  05/25/21   07/15/21    THE LANDTEK GROUP, INC              
                                                            1               3,259                  04/06/22   03/07/23    Ambrosio&Comp Inc                   
                                                            2               7,000                  06/29/21   04/04/22    The Landtek Group                   
                                                            3              10,892                  06/29/21   04/04/22    The Landtek Group                   
 
21-0641   Reconstruction               0-010-026  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0267EP Energy Project               0-010-E01  11/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0478   Reconstruction               0-010-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0772SC Visual Structural Inspection 0-010-SC1  12/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1535SC Visual Structural Inspection 0-010-SC2  05/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Clinton Avenue ES:
99-1167   Reconstruction               0-011-003  05/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0863   Reconstruction               0-011-005  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4-2            36,880                  10/22/04   10/28/04    ADJO Contracting                    
                                                            SC-4          -10,036                  01/21/05   01/24/05    ADJO Contracting                    
 
04-0067   Reconstruction               0-011-007  04/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0445   Reconstruction               0-011-008  03/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,732                  10/06/08   03/10/09    STALCO CONSTRUCTION CORP.           
                                                            1             -20,000                  08/20/09   09/11/09    JNS HEATING                         
                                                            1               1,910                  08/20/09   09/11/09    AMBROSIO & COMPANY                  
                                                            1               3,405                  12/21/09   01/07/11    PALACE ELECTRICAL CONTRACTORS INC   
                                                            2              -4,960                  12/21/09   01/07/11    STALCO CONSTRUCTION CORP            
                                                            2               1,000                  03/15/10   05/10/10    PALACE ELECTRICAL CONTRACTORS, INC. 
 
11-0907   Reconstruction               0-011-009  03/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1233   Reconstruction               0-011-010  04/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  10/21/16   11/17/16    Hygrade Insulators, Inc.            
 
17-1861   Reconstruction               0-011-012  05/08/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1253   Reconstruction               0-011-013  04/09/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1166   Reconstruction               0-011-014  02/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,000                  09/23/20   11/06/20    DOMINION CONSTRUCTION CORP.         
                                                            1              -2,000                  11/12/20   02/16/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            1             -11,318                  12/09/20   02/24/21    RENU CONTRACTING & RESTORATION      
 
19-0712   Reconstruction               0-011-015  01/07/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              54,446                  09/23/20   12/02/20    LASER INDUSTRIES, INC.              
                                                            1              -1,151                  03/02/21   04/19/21    ELDOR CONTRACTING CORP.             
                                                            1             -16,364                  05/25/21   07/15/21    RENU CONTRACTING & RESTORATION, INC 
                                                            1              -9,514                  08/03/21   04/07/22    HIRSCH&CO, LLC                      
                                                            2               1,589                  10/06/21   11/16/22    Hirsch&Co, LLC                      
 
20-0806   Reconstruction               0-011-016  03/28/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -30,000                  09/12/22   08/22/23    Renu Contracting                    
                                                            1             -10,000                  09/12/22   05/31/23    Palace Elec Contrs Inc              
 
93-0268EP Energy Project               0-011-E01  11/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0481FP Reconstruction               0-011-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0775SC Visual Structural Inspection 0-011-SC1  12/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1536SC Visual Structural Inspection 0-011-SC2  05/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg.:
11-0908   Reconstruction               1-001-001  03/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Comsewogue Public Library:
11-0072   Reconstruction               6-009-001  08/08/11  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0281   Reconstruction               6-009-003  09/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1947   Reconstruction               6-009-005  11/07/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
94-1638   New Construction             7-013-001  07/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXConcession/Press Box (demo 2021):
20-1046   Reconstruction               7-014-002  04/06/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box & Comfort Station:
20-1047   New Construction             7-017-001  04/06/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,551                  09/12/22   05/31/23    Eldor Contrg Corp                   
                                                            1              31,511                  11/15/22   12/07/23    CONSTRUCTION CONSULTANTS OF LI      
                                                            1              -5,830                  11/15/22   12/07/23    HIRSCH & CO LLC                     
 

          District Wide:
08-1258   Reconstruction               7-999-002  06/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE

SACHEM CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-05-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXSachem HS Union Campus(see 1-001):
06-0143   Reconstruction               0-001-002  09/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  06/19/07   10/28/07    Adjo Contracting                    
 
08-1552   Reconstruction               0-001-005  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lynwood Avenue School:
00-1696   Reconstruction               0-002-004  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1679   Reconstruction               0-002-005  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0289   Additions and Alterations    0-002-006  12/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-001         26,099                  02/26/04   03/17/04    JBH Environ.                        
                                                            EC-01           1,538                  05/14/04   07/09/04    VP Electric                         
                                                            GC-001         29,000                  03/25/04   03/30/04    NRI Const.                          
                                                            GC-003           -802                  02/04/05     /  /      NRI Construction Inc                
                                                            MC-01L         -3,077                  02/04/05     /  /      BG National                         
 
95-0321   Reconstruction               0-002-007  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1266   Reconstruction               0-002-008  05/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1732   Reconstruction               0-002-009  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0993   Additions and Alterations    0-002-011  08/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -2,890                  04/21/03   05/02/03    Mineola Elec.                       
                                                            GC-01          -3,000               3  07/07/04   07/15/04    Kullman Industries                  
                                                            MC-001           -374                  05/21/03   06/03/03    Airtron Corporation                 
                                                            PC-001         -5,700                  04/21/03   05/02/03    Hirsch and Company                  
 
00-1011   Reconstruction               0-002-012  04/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,350                  01/30/02   04/01/02    Marangos Const.                     
 
07-0735   Reconstruction               0-002-013  04/08/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0705   Reconstruction               0-002-014  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             4,386                  06/17/10   08/05/10    METROPOLITAN CONSTRUCTION SYSTEMS   
 
09-0773   Reconstruction               0-002-015  05/25/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             1,490                  01/13/12   04/30/12    WATRAL BROTHERS INC                 
 
08-1553   Reconstruction               0-002-016  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0221   Reconstruction               0-002-018  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0266   Reconstruction               0-002-019  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1347   Reconstruction               0-002-020  03/20/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0150   Reconstruction               0-002-021  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0649   Reconstruction               0-002-022  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1993FP Reconstruction               0-002-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Waverly Ave. Elementary:
95-1680   Reconstruction               0-003-005  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0322   Reconstruction               0-003-006  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1267   Reconstruction               0-003-007  05/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1248   Additions and Alterations    0-003-009  10/31/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,552                  11/14/06   11/14/06    Snow Industries                     
                                                            DC-01          -8,480                  11/14/06   11/14/06    C & M Door Controls, Inc.           
                                                            EC-01w         -3,206                  11/14/06   11/14/06    RMT Electric Corp.                  
                                                            GC-02w        -29,165                  11/14/06   11/14/06    SJS Construction Co., Inc.          
                                                            PC-01w         -4,934                  11/14/06   11/14/06    Hirsch & Co.                        
                                                            WC-01         -28,400                  05/08/05   11/14/06    Homeric Contracting                 
 
99-1323   Reconstruction               0-003-010  05/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0720   Additions and Alterations    0-003-011  04/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         62,537                  06/12/02   11/04/02    Commander Electric                  
                                                            GC-001        -13,300                  05/10/02   05/14/02    Excel Builders                      
                                                            GC003rev       -1,950                  07/28/03   08/14/03    Excel Builders                      
                                                            MC-001         -2,042                  06/08/05   06/08/05    Major Systems Inc.                  
                                                            PC-001         -1,410                  06/12/02   11/04/02    Chevalley and Wallace               
 
00-1925   Reconstruction               0-003-012  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0187   Reconstruction               0-003-013  12/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PA-01             365                  02/09/05   06/21/05    Hugh O Kane Electric                
 
08-0706   Reconstruction               0-003-015  04/28/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0774   Reconstruction               0-003-016  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1554   Reconstruction               0-003-017  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0222   Reconstruction               0-003-019  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0267   Reconstruction               0-003-021  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0928   Reconstruction               0-003-022  02/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              29,821                  06/27/19   07/15/19    GTS CONSTRUCTION CORP.              
 
21-0522   Reconstruction               0-003-023  12/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0151   Reconstruction               0-003-024  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0650   Reconstruction               0-003-025  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1986FP Reconstruction               0-003-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nokomis School:
92-1291   Reconstruction               0-004-004  06/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1681   Reconstruction               0-004-005  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0323   Reconstruction               0-004-006  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0290   Additions and Alterations    0-004-007  12/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DC-001        -24,800                  06/28/04   07/09/04    C&M Door Controls                   
                                                            GC-005         -8,225                  02/04/05     /  /      NRI Construction inc                
                                                            MC01A          -3,652                  02/04/05     /  /      BG national                         
                                                            PC-01         -34,400                  06/28/04   07/09/04    ARA Plumbing                        
                                                            R-001           4,062                  02/10/04   02/20/04    More Contracting                    
 
99-0014   Reconstruction               0-004-008  11/10/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1926   Reconstruction               0-004-009  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0036   Reconstruction               0-004-010  12/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            -2,500                  04/11/08   04/18/08    C/S WINDOW INSTALLERS               
                                                            WC-001          9,160                  04/20/04   04/28/04    C/S Window Installers               
 
02-0188   Reconstruction               0-004-011  12/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PA-01           5,000                  02/09/05   06/21/05    Hugh O Kane Electric                
 
08-0398   Reconstruction               0-004-012  02/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0775   Reconstruction               0-004-013  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1555   Reconstruction               0-004-014  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0682   Reconstruction               0-004-015  05/16/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0223   Reconstruction               0-004-016  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0268   Reconstruction               0-004-017  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1198   Reconstruction               0-004-018  04/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  10/07/20   02/09/21    LASER INDUSTRIES, INC.              
 
22-0152   Reconstruction               0-004-019  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0651   Reconstruction               0-004-020  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1995FP Reconstruction               0-004-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Grundy Avenue Elementary:
90-1075   Reconstruction               0-006-004  03/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1697   Reconstruction               0-006-005  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1682   Reconstruction               0-006-006  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0324   Reconstruction               0-006-007  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1249   Reconstruction               0-006-008  10/31/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              17,750                  11/14/06   11/14/06    Banker Construction                 
                                                            DC-01          -8,440                  11/14/06   11/14/06    C & M Doo Controls                  
                                                            EC-01         -15,515                  02/24/05   11/14/06    RMT Electric                        
                                                            GC-02g            -59                  11/14/06   11/14/06    SJS Construction                    
                                                            MC-01g         -6,720                  11/14/06   11/14/06    Walsh Mechanical                    
                                                            PC-01G         -2,000                  02/09/05   03/14/05    Mathusek Inc                        
                                                            PC-01g         -4,155                  11/14/06   11/14/06    Hirsch & Co.                        
                                                            WC-01         -47,395                  05/08/05   11/14/06    Homeric Contracting                 
 
00-1927   Reconstruction               0-006-009  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0736   Reconstruction               0-006-010  04/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FIVE           -4,350                  03/31/10   06/09/10    FENLEY & NICOL ENVIRONMENTAL        
                                                            ONE             7,514                  12/23/08   02/27/09    FENLEY&NICOL ENVIRONMENTAL          
 
08-0707   Reconstruction               0-006-011  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE              -711                  11/14/11   05/08/12    ULTIMATE POWER INC                  
 
09-0776   Reconstruction               0-006-012  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1556   Reconstruction               0-006-013  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0224   Reconstruction               0-006-015  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0269   Reconstruction               0-006-016  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0153   Reconstruction               0-006-017  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0652   Reconstruction               0-006-018  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gatelot Ave. School (/FS Vacant2022):
94-0437   Reconstruction               0-007-005  12/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1683   Reconstruction               0-007-006  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0325   Reconstruction               0-007-007  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1733   Reconstruction               0-007-008  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0015   Reconstruction               0-007-009  11/10/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0176   Additions and Alterations    0-007-010  01/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01            -996                  05/08/05   11/14/06    RMT Electric Corp                   
                                                            GC-001         53,500                  02/26/04   03/17/04    Stalco Construction                 
                                                            GC-02          85,034                  04/18/05   11/14/06    Stalco Construction                 
                                                            GC-03          11,700                  04/18/05   04/26/05    Stalco Construction                 
                                                            MC-01g         -6,850                  11/14/06   11/14/06    Major Systems                       
                                                            PC-01g         -6,770                  12/04/06   12/04/06    Manning Plumbing & Heating          
                                                            RC-01         -15,814                  11/14/06   11/14/06    More Contracting                    
                                                            WC-01         -30,000                  05/08/05   03/25/05    Homeric Contracting                 
 
01-0037   Reconstruction               0-007-011  12/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PSL-1          12,110                  08/30/02   09/05/02    PSL Industries                      
 
02-0189   Reconstruction               0-007-012  12/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PA-01           5,000                  02/09/05   06/21/05    Hugh O Kane electric                
 
08-0708   Reconstruction               0-007-013  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             4,546                  09/27/10   11/17/10    SJ HOERNING CONSTRUCTION INC        
                                                            TWO            31,952                  05/03/10   07/15/10    ELDOR CONTRACTING CORP              
                                                            TWO              -711                  11/14/11   05/08/12    ULTIMATE POWER INC                  
 
09-0777   Reconstruction               0-007-014  05/25/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -37,950                  06/28/11   07/27/11    ARCHITECTURAL WINDOW MFG CORP       
                                                            Two            -3,982                  12/27/11   03/30/12    Architecutral Window Mfg. Corp.     
 
08-1557   Reconstruction               0-007-015  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0683   Reconstruction               0-007-016  05/16/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -5,000                  04/22/13   07/26/13    XTRAIRE INC                         
 
15-0225   Reconstruction               0-007-017  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Samoset M.S.(fmly  HS South):
93-1448   Reconstruction               0-008-005  06/23/94  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1578   Reconstruction               0-008-006  06/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1346   Additions and Alterations    0-008-008  06/15/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1684   Reconstruction               0-008-011  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0558   Reconstruction               0-008-012  01/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0326   Reconstruction               0-008-013  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1268   Reconstruction               0-008-014  05/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1734   Reconstruction               0-008-015  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1177   Additions and Alterations    0-008-016  03/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01            -775                  12/05/02   01/03/03    Eldor Contracting                   
                                                            GC-01         -78,875                  07/07/04   07/15/04    Kullman Industries                  
                                                            HC-1           -4,895                  04/21/03   05/02/03    Major Systems                       
 
01-0960   Reconstruction               0-008-017  06/14/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          18,804                  03/29/04   04/23/04    HMJ Electric                        
                                                            00002          18,804                  10/15/07   01/23/08    HMJ ELECTRIC                        
                                                            001           -21,422                  04/11/08     /  /      C/S WINDOW INSTALLERS               
                                                            002            -3,000                  04/11/08     /  /      STALCO CONSTRUCTION INC.            
                                                            HVAC#001       27,198                  06/17/09   08/27/09    MAJOR SYSTEMS                       
                                                            VE-001        -15,000                  02/03/04     /  /      Major Systems                       
 
99-1324   Reconstruction               0-008-018  05/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1664   Reconstruction               0-008-019  06/26/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0142   Reconstruction               0-008-021  09/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,500                  08/20/07   08/24/07    Annex General Contracting           
                                                            2             161,000                  08/20/07   08/24/07    Annex General                       
                                                            3                   0                  08/20/07   08/24/07    Annex General Contracting           
                                                            4              -7,500                  08/20/07   08/24/07    Annex General Contracting           
 
08-0709   Reconstruction               0-008-022  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             2,202                  12/09/09   01/21/10    IRWIN CONTRACTING                   
                                                            ONE              -122                  02/09/10   03/25/10    SMC CONSTRUCTION CORP               
                                                            ONE            -2,000                  09/27/10   11/17/10    THERMO TECH COMBUSTION INC          
                                                            ONE               480                  02/13/12   09/18/12    ADVANCE SOUND CO                    
                                                            THREE          15,225                  03/22/10   05/14/10    LANDTEK GROUP                       
                                                            THREE           1,842                  05/03/10   06/23/10    ELDOR CONTRACTING CORP              
 
09-0778   Reconstruction               0-008-023  05/25/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -10,000                  01/21/11   02/23/11    VALCO INC                           
                                                            ONE           -15,000                  09/23/11   11/01/11    C&M DOOR CONTROLS                   
 
08-1558   Reconstruction               0-008-024  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0470   Reconstruction               0-008-025  01/06/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -1,500                  11/02/11   01/06/12    PIONEER CONSTRUCTION CO             
 
11-0684   Reconstruction               0-008-026  05/16/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0226   Reconstruction               0-008-028  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0270   Reconstruction               0-008-029  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1411   Reconstruction               0-008-030  05/05/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0691   Reconstruction               0-008-031  01/29/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0523   Reconstruction               0-008-032  12/20/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,308                  01/03/23   10/19/23    SEAFORD AVENUE CORP                 
                                                            1             -10,000                  08/09/23   12/29/23    DOMINION CONST                      
                                                            1             -15,272                  09/01/23     /  /      PATRIOT ORGNIZATION                 
 
22-0808   Reconstruction               0-008-033  02/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0700SC Visual Structural Inspection 0-008-SC1  12/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sagamore Jr. High:
93-1449   Reconstruction               0-010-005  06/23/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1685   Reconstruction               0-010-008  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0327   Reconstruction               0-010-009  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0961   Reconstruction               0-010-010  06/14/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          19,311                  03/29/04   04/23/04    HMJ Electric                        
                                                            00001              -9                  10/15/07   01/23/08    HMJ ELECTRIC                        
                                                            001           -14,037                  04/11/08     /  /      C/S WINDOW INSTALLERS               
                                                            001            -3,000                  04/11/08     /  /      STALCO CONSTRUCTION INC.            
                                                            VE-001        -15,000                  02/03/04     /  /      Major Systems                       
 
00-1238   Reconstruction               0-010-012  05/01/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0525   Reconstruction               0-010-014  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0144   Reconstruction               0-010-016  10/16/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,970                  08/03/07   08/20/07    Eldor Contracting Corp.             
 
08-0710   Reconstruction               0-010-017  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE              -500                  01/07/10   03/01/10    AMBROSIO & COMPANY INC              
                                                            THREE            -683                  11/14/11   05/08/12    ULTIMATE POWER INC                  
 
09-0779   Reconstruction               0-010-018  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1559   Reconstruction               0-010-019  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0685   Reconstruction               0-010-020  05/16/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0227   Reconstruction               0-010-021  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0271   Reconstruction               0-010-022  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1057   Reconstruction               0-010-023  04/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              27,405                  06/18/21   03/14/22    Renu Contracting                    
                                                            2             -10,000                  10/07/20   12/03/20    LASER INDUSTRIES, INC.              
 
19-1674   Reconstruction               0-010-024  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1275   Reconstruction               0-010-025  04/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,000                  10/28/21   12/06/22    Ambrosio & Company, Inc             
                                                            1              -2,000                  02/22/22   03/27/23    Dominion Const Corp                 
                                                            1              -5,930                  05/06/22   05/22/23    Rosemar Contrg Inc                  
                                                            1             -15,000                  07/20/22   03/23/23    JP Daly&Sons Inc                    
                                                            1              16,404                  01/26/23   12/15/23    PROTON CONST CORP                   
 
21-0524   Reconstruction               0-010-026  12/20/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -30,000                  01/03/23   10/19/23    SEAFORD AVENUE CORP                 
                                                            2             -15,000                  08/09/23   12/29/23    DOMINION CONST                      
                                                            2             -18,631                  09/01/23     /  /      PATRIOT ORGANIZATION INC            
 
22-1236   Reconstruction               0-010-027  04/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hiawatha Elementary:
01-0291   Additions and Alterations    0-011-004  12/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-004        -37,404                  02/04/05     /  /      NRI Construction                    
                                                            MC-01H           -495                  02/04/05   02/11/05    BG National                         
                                                            MC01H            -495                  01/27/05     /  /      BG National                         
 
95-1686   Reconstruction               0-011-005  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0328   Reconstruction               0-011-006  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1735   Reconstruction               0-011-007  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0718   Additions and Alterations    0-011-008  04/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002        -18,701                  05/10/02   05/14/02    Excel Builders Group                
                                                            MC-002         -4,183                  06/08/05   06/08/05    Major Systems, Inc.                 
                                                            PC-002         -1,505                  06/08/05   06/08/05    Chevalley & Wallace                 
 
00-1928   Reconstruction               0-011-009  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0190   Reconstruction               0-011-011  12/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PA-01           5,000                  02/09/05   06/21/05    Hugh O Kane electric                
 
07-0737   Reconstruction               0-011-012  04/08/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0399   Reconstruction               0-011-013  02/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0780   Reconstruction               0-011-014  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1560   Reconstruction               0-011-015  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0228   Reconstruction               0-011-017  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0272   Reconstruction               0-011-018  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1369   Reconstruction               0-011-019  05/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4                   0                  10/07/20   12/03/20    LASER INDUSTRIES, INC.              
 
22-0154   Reconstruction               0-011-020  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0653   Reconstruction               0-011-021  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1996FP Reconstruction               0-011-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Chippewa School:
00-1698   Reconstruction               0-012-003  05/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         62,537                  08/06/03   08/06/03    Commander Elec.                     
                                                            EC-003          2,841                  01/31/03   02/10/03    Commander Elec.                     
 
01-0292   Additions and Alterations    0-012-004  12/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002        -23,875                  01/27/05   02/11/05    NRI Construction                    
                                                            GC-002        -23,875                  02/04/05     /  /      NRI Construction                    
                                                            MC01A         -14,156                  02/04/05     /  /      BG national                         
 
95-1687   Reconstruction               0-012-005  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0329   Reconstruction               0-012-006  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1736   Reconstruction               0-012-007  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1929   Reconstruction               0-012-008  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0400   Reconstruction               0-012-010  02/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0781   Reconstruction               0-012-011  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1561   Reconstruction               0-012-012  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0229   Reconstruction               0-012-014  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0273   Reconstruction               0-012-015  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1385   Reconstruction               0-012-016  03/26/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3             -14,517                  10/07/20   02/09/21    LASER INDUSTRIES, INC.              
 
22-0155   Reconstruction               0-012-017  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0654   Reconstruction               0-012-018  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1987FP Reconstruction               0-012-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wenonah Elementary:
00-1699   Reconstruction               0-013-006  05/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          5,749                  10/04/02   10/07/02    Commander Elec.                     
 
95-1688   Reconstruction               0-013-007  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0330   Reconstruction               0-013-008  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0177   Reconstruction               0-013-009  01/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,552                  11/14/06   11/14/06    Snow Industries                     
                                                            EC-01w        -10,394                  11/14/06   11/14/06    RMT Electric Corp.                  
                                                            FC-01w         -2,000                  02/04/05   03/14/05    Mathusek, Inc.                      
                                                            MC-01w        -13,621                  11/14/06   11/14/06    Major Systems                       
                                                            PC-01w        -12,196                  11/14/06   11/14/06    Manning Plumbing & Heating'         
                                                            RC-01          -7,500                  11/14/06   11/14/06    More Contracting                    
                                                            WC-01we       -30,000                  02/08/05   03/14/05    Homeric Contracting                 
 
00-0992   Additions and Alterations    0-013-010  08/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-006         -4,492                  02/04/05   12/04/06    NRI Construction Inc                
                                                            PC-01          -2,139                  06/28/04   07/09/04    Hirsch Co                           
                                                            mc-02          -5,000                  05/08/05   03/25/05    Major Systems                       
 
00-1930   Reconstruction               0-013-011  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0123   Reconstruction               0-013-012  08/01/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,661                  07/26/07   08/07/07    More Contracting and Consulting     
 
07-0738   Reconstruction               0-013-014  04/08/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0401   Reconstruction               0-013-015  02/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FOUR             -630                  11/14/11   01/30/12    ULTIMATE POWER INC                  
 
09-0782   Reconstruction               0-013-016  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1562   Reconstruction               0-013-017  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0230   Reconstruction               0-013-019  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0274   Reconstruction               0-013-020  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0156   Reconstruction               0-013-021  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0655   Reconstruction               0-013-022  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1997FP Reconstruction               0-013-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Merrimac School:
95-1689   Reconstruction               0-014-004  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0331   Reconstruction               0-014-005  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1737   Reconstruction               0-014-006  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0013   Reconstruction               0-014-007  11/10/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1250   Additions and Alterations    0-014-008  10/31/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01M         -2,000                  02/04/05   03/14/05    Mathusek Inc                        
                                                            WC-01         -27,455                  05/08/05     /  /      Homeric Contracting                 
 
00-1012   Reconstruction               0-014-010  04/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1931   Reconstruction               0-014-011  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0191   Reconstruction               0-014-012  12/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PA-01           5,000                  02/09/05   06/21/05    Hugh O Kane electric                
 
08-0711   Reconstruction               0-014-013  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            14,198                  02/24/11   05/04/11    UNITECH SERVICES GROUP              
 
09-0783   Reconstruction               0-014-014  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1563   Reconstruction               0-014-015  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0231   Reconstruction               0-014-017  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0275   Reconstruction               0-014-018  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0525   Reconstruction               0-014-019  12/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0157   Reconstruction               0-014-020  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0656   Reconstruction               0-014-021  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1992FP Reconstruction               0-014-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cayuga School:
95-1690   Reconstruction               0-015-004  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0332   Reconstruction               0-015-005  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0178   Additions and Alterations    0-015-007  01/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -12,161                  05/08/05   11/14/06    RMT Electric Corp                   
                                                            GC-01         -65,240                  05/28/04   07/09/04    Harris Maintenance                  
                                                            MC-01         -13,504                  05/08/05   11/14/06    Major Sysems                        
                                                            PC-01C         -2,000                  02/03/05   03/14/05    Mathusek Inc                        
                                                            PC-01c         -9,397                  05/08/05   11/14/06    Manning Plumbing & Heating          
                                                            RC-01         -11,040                  05/08/05   11/14/06    More Contracting                    
                                                            WC-01         -30,000                  03/08/05   03/25/05    Homeric Contracting                 
 
00-1932   Reconstruction               0-015-008  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0038   Reconstruction               0-015-009  12/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DC-01          -1,090                  06/28/04   07/09/04    Arrow Steel Window                  
 
02-0192   Reconstruction               0-015-010  12/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PA-01           5,000                  02/09/05   06/21/05    Hugh O Kane electric                
 
07-0739   Reconstruction               0-015-011  04/08/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0402   Reconstruction               0-015-012  02/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FIVE             -711                  11/14/11     /  /      ULTIMATE POWER INC                  
 
09-0784   Reconstruction               0-015-013  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1564   Reconstruction               0-015-014  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0232   Reconstruction               0-015-016  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0276   Reconstruction               0-015-017  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0158   Reconstruction               0-015-018  11/29/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -20,000                  09/11/23   12/22/23    LONG ISLAND ROOFING                 
 
23-0657   Reconstruction               0-015-019  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1991FP Reconstruction               0-015-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          North High School:
91-1339   Reconstruction               0-016-011  07/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1691   Reconstruction               0-016-013  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0333   Reconstruction               0-016-014  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1029   Reconstruction               0-016-016  03/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0238   Additions and Alterations    0-016-018  02/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         209,743                  01/30/04     /  /      Fortunato and Sons                  
                                                            00002         101,818                  01/30/04     /  /      Fortunato and Sons                  
                                                            00003          52,664          34,791  04/23/04   04/30/04    Fortunato and Sons                  
                                                            00004          31,660                  04/23/04   04/30/04    Fortunato and Sons                  
                                                            00005         116,797          82,548  04/23/04   04/30/04    Fortunato and Sons                  
                                                            00006          46,797          36,299  04/23/04   04/30/04    Fortunato and Sons                  
                                                            00007          59,137          59,137  04/23/04   04/30/04    Fortunato and Sons                  
                                                            00008          42,060                  04/23/04   04/30/04    Fortunato and Sons                  
                                                            00009          13,557                  04/23/04   04/28/04    Fortunato and Sons                  
                                                            00010          85,900                  07/12/04   07/13/04    Fortunato and Sons                  
                                                            001            96,194                  01/30/04     /  /      RMT Elec.                           
                                                            STALCO-1      101,813         101,813  01/30/04   02/17/04    Stalco Const.                       
 
00-0719   Reconstruction               0-016-020  04/23/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          3,967                  01/31/03   02/27/03    Loius Piekut Elec.                  
                                                            NU-001           -102                  04/26/02   05/30/02    NuInternational Restaurant Supply   
 
00-0537   Reconstruction               0-016-021  02/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -3,200                  02/03/04     /  /      Eldor Contracting                   
                                                            001            -5,524                  02/03/04     /  /      JNS Heating                         
 
08-0712   Reconstruction               0-016-022  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            84,119                  05/17/10   01/10/13    MAINLINE ELECTRIC CORP              
                                                            ONE            -6,089                  05/17/10   08/04/10    ROLAND'S ELECTRIC INC               
                                                            ONE              -860                  12/16/10   01/13/11    AQUATIC DYNAMICS INC                
                                                            ONE            43,987                  05/16/11   06/07/11    AMERICAN BUILDING CONTRACTORS       
                                                            TWO           -10,400                  03/22/10   05/14/10    LANDTEK GROUP                       
                                                            TWO            12,173                  06/17/10   08/05/10    METROPOLITAN CONSTRUCTION SYSTEMS   
                                                            TWO            -9,844                  12/02/10   01/06/11    MAINLINE ELECTRIC CORP              
 
09-0785   Reconstruction               0-016-023  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1565   Reconstruction               0-016-024  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0686   Reconstruction               0-016-025  05/16/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1310   Reconstruction               0-016-026  06/02/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            25,000                  11/28/14   01/13/15    North Coast Maint. Corp.            
 
15-0233   Reconstruction               0-016-027  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0277   Reconstruction               0-016-028  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0689   Reconstruction               0-016-029  02/15/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -8,325                  10/31/18   11/09/18    ACL CONSTRUTION CORP                
 
18-0495   Reconstruction               0-016-030  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0615   Reconstruction               0-016-031  01/07/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  06/27/22   04/04/23    A1 Const Servs Inc                  
 
21-0526   Reconstruction               0-016-032  12/20/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3             -45,916                  01/03/23   10/19/23    SEAFORD AVENUE CORP                 
                                                            3              -2,000                  08/09/23   12/29/23    DOMINION CONSTR                     
                                                            3             -57,223                  09/01/23   12/29/23    PATRIOT ORGANIZATION INC            
 
22-0809   Reconstruction               0-016-033  02/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0112   Reconstruction               0-016-034  10/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Seneca Jr. High:
95-1692   Reconstruction               0-017-005  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0334   Reconstruction               0-017-006  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0962   Reconstruction               0-017-007  06/14/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -1,037                  10/15/07   01/23/08    HMJ ELECTRIC                        
                                                            001           -38,900                  04/11/08   06/21/10    C/S WINDOW INSTALLERS               
                                                            001            -3,000                  04/11/08   06/21/10    STALCO CONSTRUCTION INC.            
                                                            VE-001        -15,000                  02/03/04     /  /      Major Systems                       
 
00-0326   Additions and Alterations    0-017-008  01/16/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001        -24,100                  07/05/02   07/09/02    VP Elec.                            
                                                            GC-001         -4,500                  01/31/03   02/27/03    Kullman Industries                  
                                                            HC-1          -46,547                  06/14/04   06/22/04    Major Systems                       
 
00-0874   Reconstruction               0-017-009  02/22/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0526   Reconstruction               0-017-010  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0713   Reconstruction               0-017-012  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SIX              -711                  11/14/11   05/08/12    ULTIMATE POWER                      
                                                            TWO            -1,500                  02/09/10   03/25/10    SMC CONSTRUCTION CORP               
                                                            TWO            -2,000                  09/27/10   11/17/10    THERMO TECH COMBUSTION INC          
 
09-0786   Reconstruction               0-017-013  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1566   Reconstruction               0-017-014  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0687   Reconstruction               0-017-015  05/16/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0234   Reconstruction               0-017-016  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0278   Reconstruction               0-017-017  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1675   Reconstruction               0-017-018  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1078   Reconstruction               0-017-019  04/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0527   Reconstruction               0-017-020  12/20/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4             -21,265                  01/03/23   10/19/23    SEAFORD AVENUE CORP                 
                                                            4             -40,000                  08/09/23   12/29/23    DOMINION CONST                      
                                                            4             -27,220                  09/01/23     /  /      PATRIOT ORGANIZATION INC            
 
22-0159   Reconstruction               0-017-021  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tecumseh Elementary-LeasedToBOCES:
00-1700   Reconstruction               0-018-003  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1693   Reconstruction               0-018-004  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0335   Reconstruction               0-018-005  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1738   Reconstruction               0-018-006  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0179   Additions and Alterations    0-018-007  01/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DC-01         -37,140                  05/14/04   07/12/04    Coastal Glass                       
                                                            EC-01          -7,383                  05/08/05   11/14/06    RMT Electric                        
                                                            FC-01TE        -2,000                  02/04/05   03/14/05    Mathusek Inc                        
                                                            MC-01          -8,395                  05/08/05   11/14/06    Major Systems                       
                                                            PC-0lt        -13,315                  12/04/06   12/04/06    Manning Plumbing & Heating          
                                                            RC-01         -17,700                  05/08/05   11/14/06    More Contracting                    
                                                            WC-01         -30,000                  05/08/05   03/25/05    Homeric Contracting                 
 
00-1933   Reconstruction               0-018-008  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0403   Reconstruction               0-018-010  02/05/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0787   Reconstruction               0-018-011  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1567   Reconstruction               0-018-012  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0235   Reconstruction               0-018-014  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1994FP Reconstruction               0-018-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tamarac Elementary:
00-1701   Reconstruction               0-019-005  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1694   Reconstruction               0-019-006  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0336   Reconstruction               0-019-007  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1739   Reconstruction               0-019-008  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1251   Additions and Alterations    0-019-009  10/31/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         74,550                  06/28/04   07/09/04    SJS Construction                    
                                                            PC-01TA        -2,000                  02/04/05   03/14/05    Mathusek Inc                        
                                                            PC01           -2,000                  01/27/05   02/11/05    Mathusek inc                        
                                                            WC-011        -30,623                  03/08/05     /  /      Homeric Contracting                 
 
00-0212   Additions and Alterations    0-019-010  11/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-01          -3,315                  04/21/03   05/02/03    Major Systems                       
 
00-1934   Reconstruction               0-019-011  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0740   Reconstruction               0-019-012  04/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SIX            -1,029                  03/31/10   06/09/10    FENLEY & NICOL ENVIRONMENTAL        
                                                            TWO             8,047                  12/23/08   05/04/09    FENLEY & NICOL ENVIRONMENTAL        
 
08-0404   Reconstruction               0-019-013  02/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SEVEN            -731                  11/14/11     /  /      ULTIMATE POWER INC                  
 
09-0788   Reconstruction               0-019-014  05/25/10  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1568   Reconstruction               0-019-015  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0236   Reconstruction               0-019-017  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0279   Reconstruction               0-019-018  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0160   Reconstruction               0-019-019  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0658   Reconstruction               0-019-020  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1988FP Reconstruction               0-019-FP1  06/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sachem East High School:
01-0225SR New Construction             0-050-001  11/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0528   New Construction             0-050-001  03/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -20,487                  01/30/04   04/13/04    Eldor Contracting                   
                                                            001          -148,415                  02/03/04   02/17/04    Guy Pratt                           
                                                            001           -10,300                  04/11/08   04/25/08    U.S. FOOD SERVICE                   
                                                            1             -23,645                  10/15/07   12/28/07    NORBERTO CONSTRUCTION, INC.         
                                                            2             195,000         195,000  07/12/04   07/19/04    Sav Mor Mech.                       
                                                            VE-001        -82,300                  01/30/04     /  /      ARA Plumbing                        
                                                            VE-001        200,000                  02/03/04     /  /      SAV Mor Mech.                       
                                                            VE-001       -378,540                  02/03/04     /  /      Eldor Contracting                   
                                                            VE-001     -1,100,782                  02/03/04     /  /      Aurora Contractors                  
 
08-0714   Reconstruction               0-050-002  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE              -150                  03/22/10   05/14/10    LANDTEK GROUP                       
 
08-1569   Reconstruction               0-050-003  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1082   Reconstruction               0-050-004  03/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              92,199                  07/26/10   11/30/10    METROPOLITAN CONSTRUCTION SYSTEMS   
                                                            2              74,687                  05/05/11   05/20/11    METROPOLITAN CONSTRUCTION           
 
10-1108   Reconstruction               0-050-005  04/07/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0689   Reconstruction               0-050-006  05/16/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            One            -7,997                  10/12/12   07/01/13    Hirsch & Co., LLC                   
 
15-0237   Reconstruction               0-050-008  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0280   Reconstruction               0-050-009  01/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0690   Reconstruction               0-050-010  02/15/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-1           -14,476                  02/08/19   02/25/19    THE LANDTEK GROUP                   
 
20-0755   Reconstruction               0-050-011  01/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0113   Reconstruction               0-050-012  10/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sequoya MS-Leased to E Suffolk BOCES:
01-0660   New Construction             0-051-001  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -19,189                  04/11/08     /  /      U. S. FOOD SERVICE, INC.            
                                                            VE-001        -58,000                  02/03/04     /  /      EW Howell                           
                                                            VE-001        -25,364                  02/03/04     /  /      Northgate Elec.                     
                                                            VE-001         18,915                  02/03/04     /  /      ADJO Contracting                    
                                                            Ve-001        -14,000                  02/03/04     /  /      JNS Heating                         
 
07-0741   Reconstruction               0-051-002  04/08/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0715   Reconstruction               0-051-003  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            11,400                  12/11/09   05/13/10    Matral Brothers Inc.                
 
08-1570   Reconstruction               0-051-004  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0238   Reconstruction               0-051-005  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          XX2000 PORTABLE #1 @ SOUTH HS:
99-1366   New Construction             0-052-001  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          XX2000 PORTABLE #2 @ SOUTH HS:
99-1367   New Construction             0-053-001  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          XX2000 PORTABLE #3 @ SOUTH HS:
99-1368   New Construction             0-054-001  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPORTABLE #1 NORTH HS:
99-1508   New Construction             0-055-001  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPORTABLE #2 NORTH HS:
99-1509   New Construction             0-056-001  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXMANUFACTURED BLDG:
99-1369   New Construction             0-057-001  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPortable #3 @ North HS:
00-1023   New Construction             0-059-001  05/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001            814                  02/20/02   04/04/02    Eldor Contracting                   
 

          XXPortable #4 @ North HS:
00-1024   New Construction             0-060-001  05/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-001         -3,500                  05/21/02   05/29/02    James McCullagh                     
 

          XXPortable #2 @ Sagamore JHS:
00-1026   New Construction             0-062-001  05/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPortable #3 @ Sagamore JHS:
00-1027   New Construction             0-063-001  05/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPortable #1 @ Seneca JHS:
00-1028   New Construction             0-064-001  05/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPortable #2 @ Seneca JHS:
00-1029   New Construction             0-065-001  05/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Walter C. Dunham Admin Bldg-Vacant:
07-0390   Reconstruction               1-001-003  09/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             4,000                  10/02/08   11/06/08    BEST ROOFING OF NJ                  
 
95-1695   Reconstruction               1-001-004  07/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0742   Reconstruction               1-001-006  04/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FOUR           -4,350                  03/31/10   06/09/10    FENLEY & NICOL ENVIRONMENTAL        
                                                            THREE           7,321                  12/23/08   04/03/09    FENLEY & NICOL ENVIRONMENTAL        
 
09-0789   Reconstruction               1-001-007  05/25/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             3,060                  06/28/11   07/27/11    NEW YORK INSULATION INC             
                                                            TWO            64,000                  09/08/11   10/24/11    NEW YORK INSULATION INC             
 

          Administrative Annex:
08-0716   Reconstruction               1-005-003  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -7,425                  05/03/10   07/20/10    ELDOR CONTRACTING CORP              
                                                            ONE             1,021                  01/21/11   03/03/11    FENLEY & NICOL ENVIRONMENTAL        
                                                            TWO             2,545                  12/09/09   01/21/10    IRWIN CONTRACTING                   
                                                            TWO             1,077                  02/24/11   05/04/11    FENLEY & NICOL ENVIRONMENTAL        
 
08-1571   Reconstruction               1-005-004  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0239   Reconstruction               1-005-006  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Building:
07-0743   New Construction             3-076-001  04/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             2,348                  07/06/09   09/01/09    EXCEL BUILDERS GROUP, INC.          
                                                            ONE           -18,000                  09/01/09   09/17/09    AMBROSIO & COMPANY INC              
                                                            ONE           -10,000                  10/23/09   03/19/10    DIAM-N-BLU MECHANICAL               
 

          Transportation Office Bus Garage:
94-1521EP Reconstruction               5-021-005  06/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1709   Reconstruction               5-021-006  07/29/98  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1572   Reconstruction               5-021-007  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0416   Reconstruction               5-021-008  12/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0240   Reconstruction               5-021-010  03/01/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0098   Reconstruction               5-021-011  08/29/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1872   Additions and Alterations    5-021-012  07/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Public Library:
94-0094   Reconstruction               6-022-002  08/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1764   Additions and Alterations    6-022-003  09/28/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1547   Additions and Alterations    6-022-005  08/16/04  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0180   Reconstruction               6-022-007  09/02/09  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0055   Reconstruction               6-022-008  08/03/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0143   Reconstruction               6-022-009  08/28/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0233   Reconstruction               6-022-011  09/30/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0217   Reconstruction               6-022-013  08/26/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0218   Reconstruction               6-022-014  08/23/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          PumpHouse-OwnedBySuffolkCtyWaterAuth:
01-0529   New Construction             7-067-001  03/20/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ East High School:
08-0717   New Construction             7-074-001  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -3,124                  05/17/10   08/04/10    JS MCHUGH INC                       
 

          Press Box @ North High School:
08-0718   New Construction             7-075-001  04/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -3,124                  05/17/10   08/04/10    JS MCHUGH INC                       
 

          XXAccessory Bldg @ Library site:
07-1511   Reconstruction               7-077-002  02/27/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
95-0445   Reconstruction               7-999-002  12/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0727   Reconstruction               7-999-004  03/04/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            sandata1       18,150                  04/16/02   05/06/02    Express Wireless                    
 
08-0719   Reconstruction               7-999-005  04/28/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1746   Reconstruction               7-999-007  12/22/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1372   Reconstruction               7-999-008  04/20/18  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1520EP Energy Project               7-999-E01  06/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE

PORT JEFFERSON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-06-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Earl L. Vandermeulen High School:
96-0476   Alterations                  0-001-004  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1153   Reconstruction               0-001-005  06/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1584   Reconstruction               0-001-006  06/21/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0392   Additions and Alterations    0-001-007  01/21/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               4,065                  09/24/99   12/01/03    Majestic Plumbing                   
 
03-1081   Reconstruction               0-001-008  05/14/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,686                  06/27/05   08/18/05    Sentry Contractin g                 
 
05-0164   Reconstruction               0-001-009  11/18/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              65,856                  02/27/06   07/21/06    Stalco Construction                 
                                                            1                -720                  12/27/06   01/19/07    Walsh mechanical                    
                                                            1              -1,429                  12/27/06   01/19/07    Telsan Electric                     
                                                            2              39,000                  06/13/06   07/14/06    Stalco Construction                 
                                                            3              19,120                  11/24/06   01/12/07    Stalco Construction                 
                                                            4              -5,000                  06/25/07   07/17/07    Stalco Construction                 
 
05-0555   Reconstruction               0-001-010  04/18/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              44,477                  08/29/06   10/13/06    Capital Restoration                 
                                                            1              31,334                  12/27/06     /  /      JNS Heating Service                 
                                                            1              -6,976                  05/12/07   08/07/07    Telsan Electric                     
                                                            2               1,100                  01/23/07   02/09/07    JNS Heating Service                 
                                                            3               1,188                  11/15/07   01/28/08    JNS Heating                         
 
07-0457   Reconstruction               0-001-012  01/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  10/27/08   05/15/09    AMBROSIO & COMPANY, INC.            
                                                            1              -1,700                  03/06/09   06/09/09    TELSAN ELECTRIC, INC                
 
09-1578   Reconstruction               0-001-013  08/12/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1424   Reconstruction               0-001-015  05/26/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1142   Reconstruction               0-001-016  05/19/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  12/14/16   12/27/16    Milcon Construction                 
 
15-1269   Reconstruction               0-001-017  05/26/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1183   Reconstruction               0-001-018  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -17,605                  03/20/17   06/06/17    ACL Construction Corp.              
 
15-1616   Reconstruction               0-001-019  07/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,800                  01/02/18   01/23/18    Metro Paving LLC                    
 
15-1841   Reconstruction               0-001-020  06/09/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1935   Reconstruction               0-001-021  08/03/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -20,000                  02/22/19   03/13/19    A1 CONSTRUCTION SERVICES, INC.      
 
16-1643   Reconstruction               0-001-022  05/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,100                  07/15/19   07/16/19    ALL SERVICE ELECTRIC, INC.          
                                                            2                 -67                  09/11/19   09/13/19    ALL SERVICE ELECTRIC, INC.          
 
17-0451   Reconstruction               0-001-023  02/05/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,154                  05/17/19   06/05/19    NARFI CONTRACTING CORP.             
 
18-0852   Reconstruction               0-001-024  03/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  01/02/20   01/22/20    AMBROSIO & COMPANY, INC.            
                                                            1             -28,252                  01/27/20   06/30/20    PATRIOT ORGANIZATION, INC.          
                                                            1             -10,000                  02/06/20   03/06/20    DOMINION CONSTRUCTION CORP.         
                                                            1             -12,500                  03/09/20   07/06/20    GTS CONSTRUCTION CORP.              
 
19-0244   Reconstruction               0-001-025  10/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,266                  06/18/21   03/14/22    GTS Construction Corp               
                                                            2              30,000                  12/23/21   10/25/22    GTS Const Corp                      
 
20-0756   Reconstruction               0-001-026  01/04/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,179                  12/24/21   10/04/22    Ultimate Power                      
                                                            1              11,563                  01/18/22   01/27/23    Irwin Contr Inc                     
                                                            1              11,436                  01/31/22   02/08/23    Rolands Elec Inc                    
                                                            2               6,786                  12/24/21   10/04/22    Ultimate Power                      
                                                            208-003         3,616                  01/18/22   01/27/23    J.R. Swanson plumbling Co., Inc.    
 
21-0727   Reconstruction               0-001-027  03/21/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,729                  09/08/22   05/31/23    Hirsch & Co LLC                     
                                                            1             -13,008                  09/08/22     /  /      Palace Elec Contrs                  
                                                            1               3,280                  11/25/22   05/31/23    CORPORATE ELEC TECH INC             
                                                            1             -12,556                  08/15/23   12/22/23    AFL GENERAL CONSTRUCTION INC        
 
22-0535   Reconstruction               0-001-028  04/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1430FP Reconstruction               0-001-FP1  03/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Edna Louise Spear ES (Pt.Jeff ES):
93-1415   Reconstruction               0-002-004  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0477   Alterations                  0-002-005  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1331   Reconstruction               0-002-008  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0054   Additions and Alterations    0-002-009  11/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,290                  10/06/03   10/14/03    Reel Elec.                          
                                                            1               7,186                  05/03/04   05/07/04    Baruti Construction                 
                                                            1             -14,120                  11/26/04   03/02/05    Same Day HVAC                       
                                                            2               1,500                  05/03/04   05/07/04    Baruti Construction                 
                                                            2               2,025                  05/03/04   05/07/04    Reel Elec.                          
 
02-1704   Reconstruction               0-002-010  08/06/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,459                  04/05/04   04/12/04    Cromwell & Tish                     
                                                            1              -2,500                  12/27/05   01/11/06    Xtaire Inc                          
                                                            1              -2,500                  12/27/05   01/11/06    Relle Electric Corp                 
                                                            2              -1,500                  11/26/04   12/17/04    Cromwell & Tish                     
 
04-0775   Additions and Alterations    0-002-011  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -16,900                  08/22/05   08/25/05    Architectural Window                
 
05-0556   Reconstruction               0-002-012  04/18/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -2,624                  05/17/07   08/07/07    Telsan Electric                     
 
09-1579   Reconstruction               0-002-014  08/12/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0402   Additions and Alterations    0-002-015  12/10/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1270   Reconstruction               0-002-016  05/26/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1617   Reconstruction               0-002-017  07/07/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1842   Reconstruction               0-002-018  06/09/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0853   Additions and Alterations    0-002-019  03/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,259                  06/01/21   07/15/21    Patriot Organization Inc            
 
19-0245   Reconstruction               0-002-020  10/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            3             -27,000                  12/24/21   10/25/22    GTS Const Corp                      
 
20-0457   Reconstruction               0-002-021  12/19/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,000                  11/18/22   09/07/23    PREFERRED CONST INC                 
 
21-0728   Reconstruction               0-002-022  03/21/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -22,500                  12/07/22   12/22/23    GTS Const Corp                      
 
22-0462   Reconstruction               0-002-023  02/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1429FP Reconstruction               0-002-FP1  03/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          PortJeffersonJHS(LsdToESuffolkBOCES):
01-0241   Reconstruction               0-003-005  09/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-1            -6,045                  02/21/02   04/01/02    Koko Contracting                    
 
01-1399   Reconstruction               0-003-007  06/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            -1,150                  06/19/03   06/20/03    All Service Electric                
                                                            M-1            -2,000                  06/19/03   06/20/03    All Service Electric                
                                                            R-1            18,000                  11/21/02   01/02/03    Marangos Const.                     
                                                            R-2            -7,562                  04/15/03   04/30/03    Marangos Const.                     
                                                            R-3            43,000                  07/09/03   07/24/03    Marangos Const.                     
 
06-0731   Reconstruction               0-003-008  04/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              69,939                  06/26/08   01/30/09    ARCHITECTURAL WINDOWS               
 
07-1098   Reconstruction               0-003-009  03/07/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,471                  10/02/08   03/13/09    WALSH MECHANICAL                    
                                                            1               6,979                  10/01/08   03/17/09    STALCO CONSTRUCTION                 
                                                            1              15,111                  10/07/08   05/14/09    LEB ELECTRIC                        
                                                            1              -1,326                  03/24/09   07/03/09    HIRSCH & COMPANY, LLC               
                                                            1              -9,500                  05/20/09   07/30/09    PAZA CONSTRUCTION                   
                                                            2               5,801                  10/02/08   07/30/09    STALCO CONSTRUCTION, INC.           
                                                            3               8,879                  10/02/08   03/13/09    STALCO CONSTRUCTION, INC.           
                                                            4              10,513                  10/02/08   03/13/09    STALCO CONSTRUCTION,INC.            
 

          EarlVandermeulenHSTech(frmlyIndArts):
09-1580   Reconstruction               0-004-001  08/12/10  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0609   Reconstruction               0-004-002  03/07/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  10/08/15   11/18/15    Ambrosio & Company, Inc.            
 
15-1271   Reconstruction               0-004-003  05/26/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Relocatable:
09-1581   Reconstruction               0-005-001  08/12/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Admin Bldg (was Pupil Personal Srv):
99-0415   Reconstruction               1-009-001  01/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1272   Reconstruction               1-009-003  05/26/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box Demo:
22-0536   Reconstruction               2-011-001  04/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Operations & Maintenance Storage Fac:
00-0990   New Construction             2-017-001  07/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
22-0537   New Construction             7-032-001  04/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

MOUNT SINAI UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-07-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Elementary School:
90-1849   Reconstruction               0-001-004  08/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0504   Reconstruction               0-001-005  01/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             400                  09/04/01   01/08/02    Intelli-Tec Services                
                                                            EC-02          15,000                  12/28/01   02/28/02    Intelli-Tec Services                
 
94-1703   Reconstruction               0-001-006  07/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1649   Reconstruction               0-001-007  10/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1388   Additions and Alterations    0-001-008  01/05/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1             120,454                  06/21/05   05/26/06    Stalco Construction                 
                                                            1               5,731                  06/01/06   06/02/06    Mainline Electric                   
                                                            2              11,707                  07/18/05   08/02/05    Stalco Construction                 
 
05-1353   Reconstruction               0-001-010  07/14/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,471                  12/24/07   01/07/08    MARFI CONTRACTING CORP.             
 
06-0307   Reconstruction               0-001-011  12/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              67,800                  11/09/07   11/20/07    Central Air Heating & Cooling       
                                                            1               8,264                  11/09/07   11/20/07    Mainline Electric                   
                                                            1              10,387                  03/28/08   04/01/08    ARROW STEEL WINDOWN CORP.           
                                                            2              -8,159                  11/09/07   11/20/07    Mainline Electric                   
                                                            2              17,147                  11/09/07   11/20/07    Central Air Heating & Coooling      
                                                            3              -5,000                  11/09/07   11/20/07    Mainline Electric                   
 
11-0285   Reconstruction               0-001-013  12/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0918   Reconstruction               0-001-014  04/27/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0243   Reconstruction               0-001-015  01/09/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mt. Sinai Middle School:
90-1420   Reconstruction               0-002-001  07/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0719   Reconstruction               0-002-002  02/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1784   Reconstruction               0-002-003  07/10/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0505   Reconstruction               0-002-004  01/24/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0791   Additions and Alterations    0-002-005  12/15/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,900                  07/11/05   07/25/05    ADJO Contracting                    
                                                            1             -10,875                  08/29/06   10/30/06    INS Electrical Service              
                                                            2               2,524                  08/11/05   08/25/05    ADJO Contracting                    
                                                            3              85,000                  04/10/06   07/13/06    ADJo Contracting                    
                                                            4              -5,000                  06/01/06   06/02/06    ADJO Contracting                    
 
06-0309   Reconstruction               0-002-007  12/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,924                  11/09/07   11/20/07    Mainline Electric                   
                                                            1              30,008                  12/05/07   01/09/08    vrd contracting inc                 
                                                            2              11,097                  12/05/07   01/09/08    vrd contracting inc                 
                                                            2              -5,000                  03/14/08   04/21/08    Mainline Electric                   
                                                            3              13,221                  12/05/07   01/09/08    vrd contracting inc                 
                                                            4               7,331                  12/05/07   01/09/08    vrd contracting inc                 
 
08-1302   Additions and Alterations    0-002-008  07/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              2,456                  07/21/10   08/25/10    VRD CONTRACTING INC                 
                                                            01              6,121                  09/20/10   11/18/10    RELLE ELECTRIC                      
                                                            01             -2,744                  09/30/10   10/12/10    MAJESTIC PLUMBING CORP              
                                                            02              4,099                  07/21/10   08/25/10    VRD CONTRACTING INC                 
                                                            02              4,389                  02/14/11   03/01/11    RELLE ELECTRIC                      
                                                            03             14,986                  07/21/10   08/25/10    VRD CONTRACTING INC                 
                                                            04              3,276                  07/21/10   08/25/10    VRD CONTRACTING INC                 
                                                            05            216,824                  08/30/10   09/22/10    VRD CONTRACTING INC                 
                                                            06            -22,949                  02/03/11   03/03/11    VRD CONTRACTING INC                 
                                                            H01            -5,457                  03/14/11   06/20/11    CENTRAL AIR CORPORATION             
 
10-0956   Reconstruction               0-002-009  06/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0286   Reconstruction               0-002-010  12/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0280   Reconstruction               0-002-011  11/14/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO 1           -3,685                  10/06/14   10/08/14    MORE Contracting & Consulting, Inc. 
 
14-0314   Reconstruction               0-002-012  11/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-C1          85,141                  03/14/16   03/17/16    Pioneer Landscaping & Asphalt Paving
                                                            CO-C2         -12,595                  03/14/16   03/17/16    Pionner Landscaping & Asphalt Paving
                                                            CO-C3          -2,540                  03/14/16   03/17/16    Pioneer Landscaping & Asphalt Paving
                                                            CO-C3          -2,540                  03/14/16   03/17/16    Pioneer Landscaping & Asphalt Paving
                                                            CO-G1         -12,569                  03/14/16   03/17/16    More Consulting Corp.               
 
18-2104   Reconstruction               0-002-013  07/15/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0917   Reconstruction               0-002-014  04/21/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0601   Reconstruction               0-002-015  03/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
98-1650   Reconstruction               0-006-002  10/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0506   Reconstruction               0-006-003  01/24/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0187   Reconstruction               0-006-006  01/30/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              42,575                  07/11/05   05/26/06    Stalco Construction                 
 
03-1091   Reconstruction               0-006-007  04/13/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,934                  03/11/05   04/28/05    Palace Electrical Contractors       
                                                            1             -19,644                  03/11/05   04/28/05    Land Tek Group                      
                                                            1              14,000                  03/11/05   04/28/05    Rosemar Construction                
                                                            1              -5,257                  04/10/06   05/09/06    Rolands Electric                    
                                                            2              43,148                  03/11/05   05/26/06    Land Tek Group                      
                                                            2               7,500                  03/11/05   04/28/05    Rosemar Construction                
                                                            3              10,955                  03/11/05   04/28/05    Land Tek Group                      
                                                            4               3,200                  03/11/05   04/28/05    Land Tek Group                      
                                                            5              31,804                  03/22/05   04/26/05    Land Tek Group                      
 
06-0202   Reconstruction               0-006-009  09/15/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  10/18/07   10/23/07    MORE CONTRACTING & CONSULTING, INC. 
 
06-0308   Reconstruction               0-006-010  12/25/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,000                  11/09/07   11/20/07    Majestic Plubming & Consulting      
 
11-0287   Reconstruction               0-006-011  12/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1974   Reconstruction               0-006-012  07/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01          26,854                  11/13/18   01/23/19    MORE CONSULTING CORP                
 
18-1931   Reconstruction               0-006-013  05/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            -40,000                  01/22/20   02/10/20    MORE CONSULTIN CORP.                
 
20-0464   Reconstruction               0-006-014  10/26/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -12,000                  01/28/22   12/01/22    Barrett Roofs Inc                   
 
22-0943   Reconstruction               0-006-015  03/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXHS Press Box (demo'd July 2019):
17-1975   Reconstruction               7-009-002  07/23/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ HS:
17-1976   New Construction             7-010-001  07/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
01-1422   Reconstruction               7-999-003  07/19/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,200                  04/04/03   04/07/03    JP Daly & Sons                      
                                                            2               1,450                  04/04/03   04/07/03    JP Daly & Sons                      
 
03-0788   Reconstruction               7-999-004  12/11/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              20,524                  06/28/04   07/23/04    CBS Whitcom                         
 
19-0479   Reconstruction               7-999-005  12/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE

MILLER PLACE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-08-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          No. Country Road MS (fmly ES):
94-0042   Additions and Alterations    0-001-002  09/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1238   Reconstruction               0-001-004  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1498   Reconstruction               0-001-005  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0078   Reconstruction               0-001-007  10/13/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,900                  02/08/06   07/21/06    E an A Construction                 
                                                            2               1,606                  11/16/05   02/08/06    E and A construction                
 
01-0635   Additions and Alterations    0-001-008  04/29/02  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1598   Reconstruction               0-001-009  12/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            -6,500                  07/10/06   08/21/06    L Naro General Contractor           
                                                            L-2            19,050                  07/07/03   07/11/03    Thomas Novell Contracting           
 
01-1138   Reconstruction               0-001-010  09/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               1,188                  04/27/07   05/16/07    JNS heating Service                 
                                                            E-3             3,648                  11/22/04   03/22/05    ASR Electrical Contracting          
                                                            E-4               424                  06/09/06   06/12/06    ASR Electrical Contracting          
                                                            E1R            15,856                  05/12/04   05/14/04    ASR Elec.                           
                                                            G-4            15,742                  03/08/04   04/07/04    Rockmore Contracting                
                                                            G-5            19,354                  03/08/04   04/07/04    Rockmore Contracting                
                                                            H1-1           -2,449                  08/02/06   10/30/06    Smith Haven mechanical              
                                                            H1-1           -2,449                  08/02/06     /  /      Smith Haven Mechanical              
                                                            H2-1            1,119                  02/22/05   03/14/05    Phoenix Environmental Tech          
                                                            H2-2              715                  02/22/05   03/14/05    Phoenix Environmental Tech          
                                                            P-1            21,201                  01/30/04   04/13/04    Ambrosio Plumbing                   
 
03-1515   Additions and Alterations    0-001-011  05/12/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  02/24/05   03/17/05    Fiber Controls inc                  
 
08-0825   Reconstruction               0-001-012  04/29/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0525   Reconstruction               0-001-013  05/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            ONE            17,601                  07/13/12   07/03/13    RELLE ELECTRIC                      
                                                            One            -7,000                  06/15/12   11/20/12    JNS Heating Service Inc.            
 
11-0743   Reconstruction               0-001-014  06/12/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -6,000                  10/08/13   12/09/13    C&M DOOR                            
                                                            One            -5,000                  02/24/14   03/10/14    JBH Environmental Inc.              
                                                            One            -3,000                  09/15/14   09/29/14    Architectural Window Manufactring Co
 
11-0172   Reconstruction               0-001-017  04/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0361   Reconstruction               0-001-018  04/15/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One           552,866                  10/20/16   10/21/16    Tailored Roofing                    
 
14-1515   Reconstruction               0-001-019  04/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1321   Reconstruction               0-001-020  06/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0663FP Reconstruction               0-001-FP1  07/05/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Andrew Muller Primary School:
93-1239   Reconstruction               0-002-002  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1499   Reconstruction               0-002-003  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1781   Reconstruction               0-002-005  08/11/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,350                  11/16/05   02/08/06    rolands electric                    
 
00-1599   Reconstruction               0-002-006  12/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-3            -5,000                  07/10/06   08/21/06    L Naro General Contractor           
                                                            G-4            -9,541                  06/30/06   07/31/06    L Naro General Contractor           
                                                            L-1            12,000                  07/07/03   08/11/03    Thomas Novell Contracting           
                                                            g-2            -5,775                  07/10/06   08/21/06    L Naro General Contractor           
 
01-0636   Additions and Alterations    0-002-007  04/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1-1          -11,012                  08/25/03   09/09/03    RD Arch. Products                   
 
01-0762   Reconstruction               0-002-008  05/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-2            32,044                  02/11/03   02/13/03    Long Island Mech.                   
                                                            H-3           -25,000                  02/18/04   03/08/04    Long Island Mech.                   
 
01-1139   Reconstruction               0-002-009  09/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-5            13,209                  02/07/06   02/08/06    ASR Electrical Contracting          
                                                            H1-4             -437                  08/02/06   10/30/06    Smith Haven mechanical              
                                                            H1-4             -437                  08/02/06     /  /      Smith Haven Mechanical              
 
06-0824   Additions and Alterations    0-002-010  02/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0826   Reconstruction               0-002-011  04/29/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             9,400                  08/28/09   10/09/09    ROLAND'S ELECTRIC                   
                                                            ONE            -4,000                  01/15/10   02/25/10    STALCO CONSTRUCTION INC             
 
09-0526   Additions and Alterations    0-002-012  05/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            TWO            -5,000                  06/15/12   04/09/14    JNS HEATING SERVICE INC             
 
11-0744   Reconstruction               0-002-013  06/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0173   Reconstruction               0-002-015  04/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0362   Reconstruction               0-002-016  04/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1516   Reconstruction               0-002-017  04/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-2160   Additions and Alterations    0-002-018  05/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,000                  02/05/20   03/20/20    HARTCORN PLUMBING & HEATIMG INC.    
                                                            ONE           -10,000                  07/17/19   10/07/19    CARTER MELENCE INC.                 
 
18-1448   Reconstruction               0-002-019  03/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1573   Reconstruction               0-002-020  05/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0707   Reconstruction               0-002-021  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1699   Additions and Alterations    0-002-022  06/14/22  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0664FP Reconstruction               0-002-FP1  07/05/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sound Beach School:
94-0043   Additions and Alterations    0-003-001  09/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1240   Reconstruction               0-003-002  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0109   Reconstruction               0-003-004  07/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0637   Additions and Alterations    0-003-006  04/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1-2           -9,650                  08/27/03   09/09/03    RD Arch. Products                   
 
00-1600   Reconstruction               0-003-007  12/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1140   Reconstruction               0-003-008  09/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H1-5           11,160                  08/02/06   03/01/07    Smith Haven Mechanical              
                                                            H2-3            1,370                  01/04/06   02/08/06    Phoenix Environmental  Tech         
                                                            H2-4            8,220                  06/09/06   06/12/06    Phoenix Environmental               
 
04-0709   Additions and Alterations    0-003-009  03/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0827   Reconstruction               0-003-010  04/29/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0527   Reconstruction               0-003-011  05/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -6,800                  06/15/12   11/20/12    W.H.M. Plumbing & Heating Contractor
 
11-0745   Reconstruction               0-003-012  06/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0174   Reconstruction               0-003-014  04/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0363   Reconstruction               0-003-015  04/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0162   Reconstruction               0-003-016  08/10/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1517   Reconstruction               0-003-017  04/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0307   Reconstruction               0-003-018  10/18/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -4,000                  12/24/19   01/07/20    HI-LUME CORP.                       
 
19-1405   Reconstruction               0-003-019  03/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1222   Reconstruction               0-003-020  05/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1322   Reconstruction               0-003-021  06/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Miller Place High School:
93-1241   Reconstruction               0-006-005  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1500   Reconstruction               0-006-006  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1782   Reconstruction               0-006-008  08/11/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,100                  11/16/05   02/08/06    Rolands electric                    
                                                            3              38,000                  11/16/05   02/08/06    Rolands electric                    
 
98-0303   Reconstruction               0-006-009  11/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0954   Reconstruction               0-006-010  05/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0638   Additions and Alterations    0-006-011  04/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G2-1          293,500                  08/18/04   09/27/04    Arrow Steel Window                  
                                                            G2-2          -25,000                  11/23/05   11/25/05    Arrow steel Window                  
 
00-0349   Reconstruction               0-006-012  11/02/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1212   Reconstruction               0-006-013  04/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1764   Reconstruction               0-006-014  06/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             3,775                  12/24/02   01/14/03    Tri-Town Elec.                      
                                                            E-2               850                  03/22/04   07/26/04    Tri-Town Elec.                      
                                                            H-1            22,729                  10/21/01   11/21/02    BG National Plumbing                
                                                            H-2             9,634                  03/28/03   04/03/03    BG National Plumbing                
                                                            H-3            -2,431                  01/30/04   03/12/04    BG National Plumbing                
 
00-1601   Reconstruction               0-006-015  12/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            44,400                  11/21/02   03/13/03    Eldor Contracting                   
                                                            E-2            -9,064                  03/13/03   04/18/03    Eldor Contracting                   
                                                            L-3            32,150                  07/07/03   07/11/03    Thomas Novell Contracting           
                                                            L-4               -86                  07/07/03   07/11/03    Thomas Novell Contracting           
                                                            L-5           -46,012                  07/10/06   08/21/06    Thomas Novelli Contracting          
                                                            L2-1           -5,000                  03/13/03   04/18/03    L&M Specialty                       
                                                            P-1            12,303                  01/24/03   02/20/03    Majestic Plumbing                   
                                                            P-2 Rev        -2,122                  07/07/03   07/11/03    Majestic Plumbing                   
 
01-1141   Reconstruction               0-006-016  09/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2            12,463                  11/22/04   03/22/05    ASR Electrical Contracting          
                                                            G-1            19,900                  03/08/04   04/07/04    Rockmore Contracting                
                                                            G-2            19,225                  03/08/04   04/07/04    Rockmore Contracting                
                                                            G-3            21,872                  03/08/04   04/07/04    Rockmore Contracting                
                                                            H1-2           -2,042                  08/02/06   10/30/06    Smith Haven Construction            
                                                            H1-2           -2,042                  08/02/06     /  /      smith haven Mechanical              
                                                            H1-3             -849                  08/02/06   10/30/06    Smith Haven Construction            
                                                            H1-3             -849                  08/02/06     /  /      Smith haven Mechanical              
 
03-1334   Additions and Alterations    0-006-017  05/10/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1516   Reconstruction               0-006-018  05/12/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -793                  04/19/05   05/02/05    Director Door Service               
 
04-0710   Reconstruction               0-006-019  03/01/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,000                  02/27/06   08/08/06    KEM Construction                    
 
06-0825SR Reconstruction               0-006-020  02/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0828   Reconstruction               0-006-021  04/29/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            TWO            -8,000                  01/15/10   02/25/10    STALCO CONSTRUCTION INC             
 
09-0528   Additions and Alterations    0-006-022  05/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            36,028                  07/13/12   11/14/12    IRWIN CONTRACTING INC               
                                                            Three         -30,000                  06/15/12   11/20/12    JNS Heating Services Inc.           
 
10-0590   Additions and Alterations    0-006-023  06/13/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0746   Reconstruction               0-006-024  06/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0175   Reconstruction               0-006-026  04/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0364   Reconstruction               0-006-027  04/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0163   Reconstruction               0-006-028  08/10/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One             3,000                  10/20/16   11/28/16    NOBLE Elevator Company, Inc.        
 
14-1518   Reconstruction               0-006-029  04/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0308   Reconstruction               0-006-031  10/18/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,000                  03/03/20   07/01/20    CARTER-MELENCE, INC.                
 
18-1920   Reconstruction               0-006-032  05/02/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1614   Reconstruction               0-006-034  05/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0661FP Reconstruction               0-006-FP1  07/05/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0662FP Reconstruction               0-006-FP2  07/05/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
10-0591   New Construction             1-028-001  06/13/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -6,000                  11/13/12   06/28/13    Rocon Plumbing Heating Corporation  
                                                            One           -18,000                  11/13/12   06/28/13    Rocon Plumbing Heating Corporation  
 
14-0365   Reconstruction               1-028-002  04/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
97-1195   Reconstruction               7-999-001  03/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1278EP Energy Project               7-999-E01  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE

ROCKY POINT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-09-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Joseph A Edgar School:
98-1780   Additions and Alterations    0-001-004  11/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,367                  06/24/02   06/24/02    RMT Elec.                           
                                                            3              45,998                  06/24/02   06/25/02    Quad Const.                         
 
00-1761   Reconstruction               0-001-005  06/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  12/07/01   02/21/02    MBLES, Inc.                         
                                                            2             -15,470                  04/08/04   04/13/04    MBLES, Inc.                         
 
00-1943   Additions and Alterations    0-001-006  11/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,875                  11/08/02   03/13/03    Tailored Roofing                    
 
01-1406   Reconstruction               0-001-008  11/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,867                  07/16/04   07/21/04    Gordon Seaman Inc                   
                                                            1              -2,500                  09/13/04   10/25/04    JP Daly and Sons                    
 
02-1692   Reconstruction               0-001-009  05/23/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0720   Reconstruction               0-001-010  04/09/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            55,000                  12/04/08   01/23/09    ACL CONSTRUCTION CORP.              
                                                            TWO            20,000                  11/02/11   02/07/12    NEW YORK INSULATION INC             
                                                            TWO            -1,000                  12/16/11   04/12/12    LOCUST VALLEY ELECTRIC              
 
08-1290   Reconstruction               0-001-011  04/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            THREE          -2,500                  02/07/11   02/24/11    ROLAND'S ELECTRIC                   
 
11-1024   Reconstruction               0-001-012  04/03/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -5,000                  12/03/12   03/11/13    COUNTRY CARPET DISTRIBUTORS INC     
 
16-0565   Reconstruction               0-001-013  02/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,300                  01/02/18   01/23/18    Metro Paving LLC                    
                                                            1             -17,164                  03/01/18   03/13/18    Milcon Construction                 
 
16-0815   Reconstruction               0-001-014  04/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,777                  01/02/18   01/31/18    Interphase Electrical Corp.         
                                                            1               7,829                  01/02/18   01/31/18    Ambrosio & Company, Inc.            
                                                            1             -19,796                  05/16/18   05/18/18    WALSH MECHANICAL CONTRACTORS        
                                                            1                 -55                  01/22/20   02/19/20    STALCO CONSTRUCTION, INC.           
                                                            2              -3,617                  03/01/18   03/29/18    Interphase Electrical Corp.         
 
16-1927   Reconstruction               0-001-015  03/15/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-1            -3,000                  04/03/19   04/11/19    DOMINION CONSTRUCTION CORP.         
                                                            P-1             2,016                  02/22/19   03/07/19    SEAFORD AVENUE CORP.                
 
20-1494   Reconstruction               0-001-016  06/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1405FC Reconstruction               0-001-018  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1993   Reconstruction               0-001-019  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2305   Reconstruction               0-001-020  09/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1477EP Energy Project               0-001-E01  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rocky Point High:
99-0163   Reconstruction               0-005-005  08/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0006   Reconstruction               0-005-006  07/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1267   Reconstruction               0-005-007  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1079   Reconstruction               0-005-009  05/12/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              27,197                  07/30/02   07/30/02    Tower Landscaping                   
 
99-1703   Additions and Alterations    0-005-010  10/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,995                  10/30/01   01/08/02    Majestic Plumbing                   
                                                            1              66,000                  07/30/02   07/30/02    Hutton Elec.                        
                                                            1             272,730         272,730  07/30/02   09/06/02    Long Island Mech.                   
                                                            1             135,372                  06/01/01   06/08/01    Pav-Lak Industries                  
                                                            2              52,394                  01/03/02   07/30/02    Hutton Elec.                        
                                                            2              38,619                  12/17/01   02/28/02    Majestic Plumbing                   
                                                            2              22,384                  02/05/02   04/01/02    Long Island Mech.                   
                                                            3              16,712                  03/28/02   05/14/02    Hutton Elec.                        
                                                            3              54,355                  03/28/02   05/14/02    Majestic Plumbing                   
                                                            3              14,909                  05/06/02   05/10/02    Long Island Mech.                   
                                                            3             199,780         199,780  07/30/02   09/06/02    Pav-Lak Industries                  
                                                            4              49,476                  02/05/02   04/01/02    Pav-Lak Industries                  
                                                            4              35,327                  07/29/02   08/27/02    Hutton Elec.                        
                                                            4              19,142                  07/29/02   08/27/02    Majestic Plumbing                   
                                                            5              89,067                  08/01/02   08/16/02    Pav-Lak Industries                  
                                                            5              57,000          57,000  08/29/02   02/18/03    Hutton Elec.                        
                                                            5              18,624          18,624  11/27/02   01/02/03    Majestic Plumbing                   
                                                            6             199,515          80,000  08/01/02   08/16/02    Pav-Lak Industries                  
                                                            6              47,898          47,898  08/29/02   02/18/03    Majestic Plumbing                   
                                                            7             106,644                  01/02/03   01/10/03    Pav-Lak Industries                  
                                                            7             -29,419                  06/02/04   06/22/04    Majestic Plumbing Consulting        
 
00-1944   Additions and Alterations    0-005-011  11/08/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0621   Reconstruction               0-005-012  02/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3             -12,000                  12/07/01   02/21/02    ACL Const.                          
 
00-0851   Reconstruction               0-005-013  05/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -8,089                  11/08/02   11/21/02    JP Daly & Sons                      
                                                            1              16,200                  11/27/02   12/09/02    ECS Mech.                           
                                                            2              14,880                  11/27/02   12/09/02    ECS Mech.                           
                                                            3              16,900                  11/27/02   12/09/02    ECS Mech.                           
                                                            4              19,500                  11/27/02   12/09/02    ECS Mech.                           
                                                            5              13,100                  11/27/02   12/09/02    ECS Mech.                           
 
02-1693   Reconstruction               0-005-014  05/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,747                  11/02/05   11/04/05    Palace Electric                     
 
01-1405   Reconstruction               0-005-015  09/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 986                  02/26/04   03/12/04    Chevalley and Wallace               
                                                            1               1,342                  03/10/04     /  /      Rolands Electric                    
                                                            1              -2,300                  03/10/04   03/17/04    Valco Inc                           
                                                            1              -2,000                  03/23/04   04/13/04    Eldor Contracting                   
                                                            1              10,000                  03/11/05   03/29/05    REH Construction                    
 
02-0899   Reconstruction               0-005-016  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1619   Reconstruction               0-005-017  06/21/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              29,570                  10/08/04   10/12/04    Rosemar Construction                
 
04-0248   Reconstruction               0-005-018  10/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0554   Reconstruction               0-005-019  02/15/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -5,000                  02/19/08   08/08/08    KEM construction                    
                                                            One            -5,000                  02/19/08   08/08/08    KEM construction                    
 
07-0721   Reconstruction               0-005-020  04/09/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            THREE          -5,000                  12/16/11   04/12/12    LOCUST VALLEY ELECTRIC              
 
07-1387   Reconstruction               0-005-021  06/25/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -5,000                  12/22/09   01/07/11    KEM CONSTRUCTION CORP               
 
08-1291   Reconstruction               0-005-022  04/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            26,268                  11/09/09   12/08/09    ROLAND'S ELECTRIC                   
                                                            TWO            -8,041                  02/07/11   02/24/11    ROLAND'S ELECTRIC                   
 
08-0963   Reconstruction               0-005-023  04/20/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -1,230                  11/03/10   11/09/10    TELSAN ELECTRIC INC                 
                                                            ONE            -3,000                  12/24/10   02/22/11    SJ HOERNING CONSTRUCTION INC        
 
09-1016   Reconstruction               0-005-024  03/04/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1225   Reconstruction               0-005-025  05/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             8,390                  11/02/11   01/06/12    NEW YORK INSULATION INC             
                                                            ONE           -11,800                  11/02/11   01/06/12    PLATO CONSTRUCTION CORP             
                                                            ONE            -5,000                  11/02/11   01/06/12    ACL CONSTRUCTION CORP               
                                                            ONE             8,372                  08/16/12   12/21/12    MADISON AVENUE CONSTRUCTION         
                                                            ONE            32,880                  08/16/12   12/21/12    UNITECH SERVICES GROUP              
                                                            THREE          -5,000                  02/24/12   08/06/12    NEW YORK INSULATION INC             
 
12-0492   Reconstruction               0-005-028  01/23/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            Two            -1,000                  12/17/13   01/10/14    Rocon Plumbing & Heating Corp.      
 
12-0673   Reconstruction               0-005-029  03/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            -3,000                  12/17/13   01/23/14    Rocon Plumbing & Heating Corp.      
 
12-0862   Reconstruction               0-005-030  05/15/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0482   Reconstruction               0-005-031  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -20,000                  01/02/18   01/26/18    Metro Paving LLC                    
 
16-0816   Reconstruction               0-005-032  04/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,158                  09/07/18   09/14/18    PREFERRED CONSTRUCTION INC          
                                                            1                   0                  02/11/19   03/01/19    SEAFORD AVENUE CORP.                
                                                            1              -5,000                  11/22/19   12/05/19    XTRAIRE, INC.                       
                                                            1             -45,000                  05/31/22   04/10/23    Palace Elec Contrs                  
                                                            2             -15,000                  01/22/20   02/19/20    STALCO CONSTRUCTION, INC.           
                                                            2             -20,568                  06/27/22   04/27/23    Palace Elec Contrs                  
 
16-0708   Reconstruction               0-005-033  05/04/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1928   Reconstruction               0-005-034  03/15/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-2            -5,000                  04/03/19   04/11/19    DOMINION CONSTRUCTION CORP.         
                                                            P-2            -4,349                  02/22/19   03/07/19    SEAFORD AVENUE CORP.                
 
17-0571   Reconstruction               0-005-035  04/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -65,581                  04/03/19   04/15/19    LASER INDUSTRIES, INC.              
 
17-1366   Reconstruction               0-005-036  04/24/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0121   Reconstruction               0-005-037  08/14/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1495   Reconstruction               0-005-038  06/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1626   Reconstruction               0-005-039  06/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0468FC Reconstruction               0-005-040  04/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1406FC Reconstruction               0-005-041  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1994   Reconstruction               0-005-042  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2306   Reconstruction               0-005-043  09/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0678FP Reconstruction               0-005-FP1  03/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0334SC Visual Structural Inspection 0-005-SC1  12/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Frank J. Carasiti Elementary School:
93-1170   Reconstruction               0-006-005  06/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0893   Alterations                  0-006-006  03/30/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1945   Additions and Alterations    0-006-007  11/08/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1209   Additions and Alterations    0-006-008  06/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  01/02/03   03/13/03    Manning Plumbing                    
                                                            1              36,937                  01/16/03   02/04/03    Pav-Lak Industries                  
                                                            2              46,500                  01/16/03   02/04/03    Pav-Lak Industries                  
                                                            3              17,523                  05/06/03   05/08/03    Pav-Lak Industries                  
 
00-0852   Reconstruction               0-006-009  05/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2                -525                  05/11/05   05/12/05    JP Daly And Sons Inc                
                                                            6              19,400                  11/27/02   12/09/02    ECS Mech.                           
 
02-1694   Reconstruction               0-006-010  05/23/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0722   Reconstruction               0-006-012  04/09/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -10,000                  08/21/09   09/11/09    PROTON CONSTRUCTION CORP            
                                                            ONE            -5,000                  12/16/11   04/12/12    LOCUST VALLEY ELECTRIC              
 
08-1292   Reconstruction               0-006-013  04/23/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1489   Reconstruction               0-006-014  07/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             6,435                  11/17/09   12/31/09    POWER-UP ELECTRICAL CONTRACTING INC 
                                                            ONE              -271                  08/09/10   09/10/10    KEM CONSTRUCTION CORP               
 
12-0281   Reconstruction               0-006-015  05/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1231   Reconstruction               0-006-016  05/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,100                  05/01/17   05/02/17    Milcon Construction                 
 
16-0483   Reconstruction               0-006-017  02/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0933   Reconstruction               0-006-018  06/22/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  02/13/20   03/20/20    HI TECH AIR CONDITIONING            
 
16-1929   Reconstruction               0-006-019  03/15/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              24,295                  11/22/19   01/17/20    PATRIOT ORGANIZATION, INC.          
                                                            1               8,234                  11/22/19   12/05/19    SEAFORD AVENUE CORP.                
                                                            1              -4,400                  12/04/19   12/13/19    ROLAND'S ELECTRIC, INC.             
                                                            1              -6,000                  04/09/20   07/06/20    THERNO TECH COMBUSTION              
 
20-1496   Reconstruction               0-006-020  06/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1627   Reconstruction               0-006-021  06/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1407FC Reconstruction               0-006-022  03/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1995   Reconstruction               0-006-023  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2307   Reconstruction               0-006-024  09/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1478EP Energy Project               0-006-E01  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0679FP Reconstruction               0-006-FP1  03/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Bldg.:
07-1914   New Construction             3-011-001  09/19/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE           -17,000                  12/22/09   02/05/10    AMBROSIO & COMPANY INC              
                                                            ONE            -5,000                  03/03/10   04/21/10    KEM CONSTRUCTION CORP               
 

          District-Wide:
96-1516   Reconstruction               7-999-001  05/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0636   Reconstruction               7-999-002  03/14/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              43,141          43,141  11/08/02   Disapproved ICAS                                
                                                            1             -86,354                  06/06/05   06/07/05    Palace Electrical Contractors       
                                                            2               7,900                  02/26/04   04/08/04    ICAS                                
 
06-0744   Reconstruction               7-999-003  01/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0246   Reconstruction               7-999-004  12/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0986   Reconstruction               7-999-006  06/22/18  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0035   Reconstruction               7-999-007  08/06/21  NO CHANGE ORDERS ON ELECTRONIC FILE

MIDDLE COUNTRY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-11-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Oxhead Road Elementary School:
94-0154   Reconstruction               0-001-005  09/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1404   Reconstruction               0-001-007  05/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1533   Reconstruction               0-001-012  07/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0783   Reconstruction               0-001-013  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,143                  10/07/03   10/27/03    Air Design                          
                                                            1              -3,025                  04/12/04   04/27/04    Manning Plumbing                    
                                                            1                -757                  04/12/04   04/27/04    All Service Electric                
                                                            1              10,114                  03/25/05   06/15/05    Tromel Construction                 
 
05-0401   Reconstruction               0-001-015  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  09/10/08   09/29/08    MAJESTIC PLUMBING & CONSULTING CORP.
                                                            1               1,393                  10/20/08     /  /      ROLANDS ELECTRIC                    
                                                            1               5,776                  10/21/08   11/06/08    HVAC, INC.                          
                                                            1             -17,217                  10/20/08   01/27/09    ADJO CONTRACTING CORP.              
                                                            2               4,786                  11/26/08   11/27/12    ROLANDS ELECTRIC                    
                                                            3              -5,000                  02/09/09   04/23/09    ROLANDS ELECTRIC                    
 
06-0792   Reconstruction               0-001-016  05/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               4,170                  11/26/08   05/15/09    ROLANDS ELECTRIC INC.               
                                                            1               3,918                  11/24/08   05/19/09    JNS HEATING SERVICES, INC.          
                                                            1               1,759                  12/08/08   05/19/09    WHM PLUMBING & HEATING CONTRACTORS  
                                                            1               1,677                  12/08/08   05/19/09    WHM PLUMBING & HEATING CONTRACTORS  
                                                            1              14,956                  11/20/08   02/27/09    W.J. NORTHRIDGE                     
 
09-1257   Reconstruction               0-001-017  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1274   Reconstruction               0-001-018  10/22/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1355   Reconstruction               0-001-019  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          121,950                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
 
15-1300   Reconstruction               0-001-020  09/14/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E001           -2,500                  03/13/19   03/14/19    PALACE ELECTRICAL CONTRACTORS,INC.  
 
15-1734   Reconstruction               0-001-021  03/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001            9,647                  03/13/19   03/15/19    WEB CONSTRUCTION CORPORATION        
                                                            H-001          -1,810                  10/15/19   10/18/19    DOMINION CONSTRUCTION CORP.         
 
18-0957   Reconstruction               0-001-022  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0633FP Reconstruction               0-001-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Holbrook Road Elementary:
92-0041   Reconstruction               0-002-004  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1122   Reconstruction               0-002-006  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1697   Reconstruction               0-002-007  09/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0784   Reconstruction               0-002-008  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,275                  04/12/04   04/27/04    Manning Plumbing                    
                                                            1                   0                  04/12/04   04/27/04    Long Island Mech.                   
                                                            1               6,658                  04/12/04   04/27/04    All Service Elec.                   
                                                            1              -2,653                  12/23/04   02/01/05    Lipsky Enterprises                  
                                                            2                -450                  04/12/04   04/27/04    Manning Plumbing                    
                                                            2              29,455                  11/26/04   03/21/05    Lipsky Enterprise                   
                                                            3              11,875                  10/07/03   10/27/03    Lipsky Ent.                         
 
01-1344   Reconstruction               0-002-009  11/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  04/12/04   04/20/04    All County Paving                   
                                                            2              -5,067                  04/12/04   04/20/04    All County Paving                   
 
05-0402   Reconstruction               0-002-011  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,697                  10/20/08   11/06/08    MAJESTIC PLUMBING & CONSULTING CORP.
                                                            1             -74,099                  10/21/08   11/19/08    ADJO CONTRACTING CORP.              
                                                            1               7,553                  10/21/08   01/30/09    HVAC INC.                           
                                                            2               5,762                  11/24/08   01/16/09    HVAC INC.                           
 
05-0927   Reconstruction               0-002-012  07/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              70,178                  10/01/08   11/13/14    HVAC,INC                            
                                                            1               5,610                  12/08/08   05/19/09    MAINLINE ELECTRIC CORP.             
                                                            1            -191,187                  12/08/08   01/23/09    KENSTAR CONSTRUCTION                
                                                            1             -19,430                  02/01/10   06/01/10    R.J. PAINTING INC                   
                                                            2              15,600                  10/21/08   04/02/09    HVAC, INC.                          
                                                            2              15,600                  10/21/08     /  /      HVAC, INC.                          
 
09-1258   Reconstruction               0-002-014  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1735   Reconstruction               0-002-015  03/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-1            7,500                  01/22/18   02/05/18    Stalco Construction Inc.            
                                                            H-001          -9,447                  10/15/19   10/18/19    DOMINION CONSTRUCTION CORP.         
 
14-1356   Reconstruction               0-002-016  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -25,000                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
 
15-0937   Reconstruction               0-002-017  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0959   Reconstruction               0-002-018  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0629FP Reconstruction               0-002-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Unity Dr. Pre-K Kdgtn. Ctr.:
95-1408   Reconstruction               0-003-006  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1695   Reconstruction               0-003-007  09/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0785   Reconstruction               0-003-008  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,655                  10/07/03   10/27/03    Ultimate Power                      
                                                            1               3,183                  04/12/04   04/27/04    All Service Electric                
                                                            1              -3,025                  04/12/04   04/27/04    Manning Plumbing                    
                                                            1              -3,550                  12/23/04   02/01/05    Lipsky Enterprises                  
 
05-0403   Reconstruction               0-003-010  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,500                  09/10/08   09/29/08    MAJESTIC PLUMBING & CONSULTING CORP.
                                                            1               4,443                  10/21/08   11/06/08    HVAC, INC.                          
                                                            1             -15,947                  10/20/08   12/11/08    Adjo Contracting Corp.              
 
06-0793   Reconstruction               0-003-011  05/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 792                  11/26/08   05/15/09    ROLANDS ELECTRIC INC.               
                                                            1              10,401                  12/08/08   05/19/09    JNS HEATING SERVICES, INC.          
                                                            1               3,159                  11/20/08   02/27/09    W.J. NORTHRIDGE                     
 
09-1259   Reconstruction               0-003-012  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1275   Reconstruction               0-003-013  10/14/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1357   Reconstruction               0-003-014  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001           -3,823                  03/13/19   03/15/19    ARROW STEEL CORPORATION             
 
15-1736   Reconstruction               0-003-015  03/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001           -6,792                  03/13/19   03/15/19    WEB CONSTRUCTION CORPORATION        
 
18-0960   Reconstruction               0-003-016  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0635FP Reconstruction               0-003-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bicycle Path Pre-K Kdgtn. Ctr.:
93-1188   Reconstruction               0-005-002  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1771   Reconstruction               0-005-003  07/26/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0843   Reconstruction               0-005-005  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1400   Reconstruction               0-005-006  09/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0404   Reconstruction               0-005-008  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -12,496                  10/20/08   12/11/08    ADJO CONTRACTING CORP.              
                                                            1              11,107                  10/21/08   11/06/08    HVAC, INC.                          
 
05-0928   Reconstruction               0-005-009  07/20/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0824   Additions and Alterations    0-005-010  02/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -651                  06/18/10   08/23/10    WALSH MECHANICAL                    
                                                            1               3,106                  08/09/10   09/10/10    ELDOR CONTRACTING CORP              
                                                            1             -10,522                  02/11/11   03/08/11    TROMEL CONSTRUCTION CORP            
 
09-1260   Reconstruction               0-005-011  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1276   Reconstruction               0-005-012  10/22/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1358   Reconstruction               0-005-013  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001         -25,000                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
 
15-1737   Reconstruction               0-005-014  04/10/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0961   Reconstruction               0-005-015  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1195EP Energy Project               0-005-E01  05/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1188EP Energy Project               0-005-E02  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0626FP Reconstruction               0-005-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Newfield High School:
90-1411   Reconstruction               0-006-005  06/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1772   Reconstruction               0-006-006  07/26/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0168   Reconstruction               0-006-007  08/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1394   Reconstruction               0-006-008  06/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1128   Reconstruction               0-006-009  06/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1196   Reconstruction               0-006-010  05/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1176   Reconstruction               0-006-012  04/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0786   Additions and Alterations    0-006-014  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              48,105                  06/06/02   08/15/02    MH Kane Const.                      
                                                            1              19,081                  10/24/02   10/29/02    Chevalley & Wallace Plumbing        
                                                            1              43,000                  12/02/02   01/02/03    DiFrancia Electric                  
                                                            1              -7,956                  10/07/03   10/27/03    JNS Heating                         
                                                            1              -2,000                  10/07/03   10/27/03    Nickerson Corp.                     
                                                            2               4,613                  11/14/02   01/08/03    Chevalley & Wallace Plumbing        
                                                            2              31,925                  12/02/02   01/02/03    DiFrancia Electric                  
                                                            3              13,227                  10/07/03   10/27/03    MH Kane Const.                      
                                                            3               5,846                  10/07/03   10/27/03    Chevalley & Wallace Plumbing        
                                                            3              11,056                  04/12/04   04/27/04    DiFrancia Electric                  
                                                            3               1,526                  09/27/04   12/24/04    JNS Heating                         
                                                            4               8,096                  10/07/03   10/27/03    MH Kane Const.                      
                                                            4              -2,480                  10/07/03   10/27/03    Chevalley & Wallace Plumbing        
                                                            4              -7,487                  04/12/04   04/27/04    DiFrancia Electric                  
                                                            4              -9,675                  09/27/04   12/24/04    JNS Heating                         
                                                            5              -1,826                  04/12/04   04/27/04    Chevalley & Wallace Plumbing        
                                                            5              -8,434                  04/12/04   04/27/04    DiFrancia Electric                  
                                                            5              -3,072                  09/27/04   12/24/04    JNS Heating                         
                                                            5              13,764                  09/14/05   09/29/05    MH Kane Construction                
                                                            6              -4,851                  04/12/04   04/27/04    DiFrancia Electric                  
                                                            7              -5,139                  04/12/04   04/27/04    DiFrancia Electric                  
 
01-1345   Reconstruction               0-006-015  09/19/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,765                  04/12/04   05/03/04    Rosemar Construction                
                                                            2              19,980                  04/12/04   05/03/04    Rosemar Construction                
 
05-0405   Reconstruction               0-006-017  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,674                  09/12/07   10/18/07    Mainline Electric                   
                                                            1              32,322                  02/06/08   04/04/08    Laser Industries, Inc               
 
06-0816   Reconstruction               0-006-018  05/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,060                  10/20/08   11/06/08    ROLANDS ELECTRIC                    
                                                            1              18,598                  12/20/08   02/27/09    W.J. NORTHRIDGE                     
                                                            1             -19,430                  02/01/10   06/01/10    R.J. PAINTING INC                   
                                                            2              16,763                  10/20/08   05/14/09    ROLANDS ELECTRIC                    
                                                            2               8,270                  12/08/08   01/23/09    W.J. NORTHRIDGE                     
                                                            3              -7,500                  02/09/09   05/29/09    ROLANDS ELECTRIC                    
 
09-1261   Reconstruction               0-006-019  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1261   Reconstruction               0-006-021  05/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -76,260                  05/03/16   07/07/16    WB Contracting Corp.                
                                                            G1-001         -1,590                  04/26/17   05/12/17    LandTek Group, Inc.                 
 
15-0968   Reconstruction               0-006-022  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0481   Additions and Alterations    0-006-024  09/16/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001         -13,384                  03/02/20   06/29/20    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            G-001           8,289                  11/12/19   11/22/19    CAPOBIANCO, INC.                    
                                                            G-002           9,518                  03/02/20   06/30/20    CAPOBIANCO, INC.                    
                                                            G1-001         -5,000                  02/18/22   02/18/22    FIDELE CONSTRUCTION INC.            
                                                            H-001          -5,375                  06/27/19   07/02/19    jNS HEATING SERVICE, INC.           
                                                            H-002           2,825                  11/12/19   11/20/19    JNS HEATING SERVICE, INC.           
                                                            P-001           6,128                  10/31/18   11/26/18    HIRSCH & CO LLC                     
                                                            P-004           6,045                  06/27/19   07/02/19    HIRSCH & CO.,LLC                    
                                                            P002            7,197                  03/07/19   03/15/19    HIRSCH & CO. LLC                    
                                                            P003            3,404                  03/07/19   03/15/19    HIRSCH & CO. LLC                    
 
17-0195   Reconstruction               0-006-025  05/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          -7,500                  02/07/22   02/08/23    Eldor Const Corp                    
 
16-0539   Reconstruction               0-006-026  06/19/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1482   Additions and Alterations    0-006-027  06/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E001           11,999                  06/04/21   03/10/22    Sunrise Electrical Services         
                                                            G-001         -36,236                  11/12/19   11/22/19    WEB CONSTRUCTION CORP.              
                                                            P-001         -10,956                  09/30/19   10/02/19    AMBROSIO & COMPANY, INC.            
 
18-0962   Reconstruction               0-006-028  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0975   Reconstruction               0-006-029  05/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0637FP Reconstruction               0-006-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dawnwood Middle School:
90-1773   Reconstruction               0-008-005  07/26/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0051   Reconstruction               0-008-006  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0826   Reconstruction               0-008-008  03/18/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1123   Reconstruction               0-008-009  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1056   Reconstruction               0-008-010  03/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1177   Reconstruction               0-008-011  04/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1694   Reconstruction               0-008-012  09/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0787   Additions and Alterations    0-008-013  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,691                  04/02/02   05/06/02    Lusitano Ent.                       
                                                            1              14,608                  11/14/02     /  /      Long Island Mech.                   
                                                            1              30,409                  12/02/02   01/02/03    McDowell Elec.                      
                                                            1              13,125                  04/12/04   04/27/04    ARA Plumbing                        
                                                            1              -2,000                  04/16/04     /  /      Nickerson Corp                      
                                                            2             -14,127                  07/31/03   08/15/03    McDowell Elec.                      
                                                            2                 927                  04/12/04   04/27/04    Long Island Mech.                   
                                                            3             -26,604                  08/06/03   08/14/03    Lusitano Ent.                       
                                                            4              10,500                  02/19/03   03/06/03    Lusitano Ent.                       
 
05-0406   Reconstruction               0-008-015  01/19/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0817   Reconstruction               0-008-016  05/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,641                  10/22/08   03/13/09    ROLANDS ELECTRIC                    
                                                            1              10,160                  11/24/08     /  /      JNS HEATING SERVICES, INC.          
                                                            1              12,841                  12/20/08   02/27/09    W.J. NORTHRIDGE                     
                                                            2               3,683                  11/26/08   05/19/09    ROLANDS ELECTRIC                    
                                                            3              -5,000                  02/09/09   06/08/09    ROLANDS ELECTRIC                    
 
09-1262   Reconstruction               0-008-017  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0969   Reconstruction               0-008-018  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1738   Reconstruction               0-008-020  05/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          -3,258                  11/01/18   11/09/18    PALACE ELECTRICAL CONTRACTORS INC   
                                                            G-001          -9,645                  11/01/18   11/29/18    RENU CONTRACTING & RESTORATION INC  
                                                            H-001           2,065                  11/01/18   11/09/18    INSHALLAH MECHANICAL CORP           
                                                            P-001         -17,347                  03/09/18   03/29/18    Ambrosio & Company, Inc.            
 
15-0917   Reconstruction               0-008-021  04/26/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1-001        -10,735                  04/26/17   04/28/17    More Consulting Corp.               
 
16-0542   Reconstruction               0-008-022  06/19/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001         465,000                  09/10/21   11/29/22    Arrow Steel Window Corp             
 
17-1476   Reconstruction               0-008-023  06/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001            -273                  06/04/21     /  /      Sunrise Electrical Services         
                                                            G-001         -95,949                  03/02/20   06/30/20    STALCO CONSTRUCTION, INC.           
                                                            P-001          17,591                  10/15/19   10/18/19    AMBROSIO & COMPANY                  
 
18-0963   Reconstruction               0-008-024  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0976   Reconstruction               0-008-025  05/10/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0639FP Reconstruction               0-008-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hawkins Path Elementary:
90-1155   Reconstruction               0-009-002  03/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0748   Reconstruction               0-009-004  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1055   Reconstruction               0-009-005  03/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0788   Reconstruction               0-009-006  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,025                  04/12/04   04/27/04    Manning Plumbing                    
                                                            1              -5,000                  04/12/04   04/27/04    Ultimate Power                      
                                                            1               9,342                  04/12/04   04/27/04    All Service Electric                
                                                            1              -2,611                  12/23/04   02/01/05    Lipsky Enterprises                  
                                                            2               7,753                  10/07/03   10/27/03    Lipsky Ent.                         
                                                            2              -1,792                  04/12/04   04/27/04    Manning Plumbing                    
 
05-0407   Reconstruction               0-009-007  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,663                  10/18/07   10/23/07    MAJESTIC PLUMBING & CONSULTING CORP.
 
05-0929   Reconstruction               0-009-008  07/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,434                  06/09/08   02/05/09    MAJESTIC PLUMBING & CONTRACTING     
                                                            1              39,704                  10/01/08   05/14/09    HVAC,INC                            
 
09-1263   Reconstruction               0-009-009  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1277   Reconstruction               0-009-010  10/22/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1361   Reconstruction               0-009-011  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -22,010                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
 
15-1739   Reconstruction               0-009-012  03/22/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001         -15,932                  03/13/19   03/15/19    WEB CONSTRUCTION CORPORATION        
                                                            H-001         -11,859                  10/15/19   10/18/19    DOMINION CONSTRUCTION CORP.         
 
18-0964   Reconstruction               0-009-013  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0628FP Reconstruction               0-009-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Selden Middle School:
90-1774   Reconstruction               0-010-006  07/26/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0052   Reconstruction               0-010-007  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0844   Reconstruction               0-010-008  04/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1508   Reconstruction               0-010-009  06/30/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0155   Reconstruction               0-010-010  09/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0789   Additions and Alterations    0-010-011  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              14,646                  04/02/02   05/06/02    Chevalley & Wallace Plumbing        
                                                            1              19,976                  04/02/02   05/06/02    JNS Heating                         
                                                            1               9,513                  05/13/02   05/24/02    Damiano GC Ent.                     
                                                            1              15,498                  08/06/03   08/14/03    Klienknecht Elec.                   
                                                            1               3,960                  10/07/03   10/27/03    Statewide Roofing                   
                                                            1              -2,000                  10/07/03   10/27/03    Nickerson Corp.                     
                                                            10             -8,137                  10/07/03   10/27/03    Damiano GC Ent.                     
                                                            2               9,012                  04/02/02   05/06/02    JNS Heating                         
                                                            2              13,963                  05/13/02   05/24/02    Damiano GC Ent.                     
                                                            2               9,824                  11/14/02   01/08/03    Chevalley & Wallace Plumbing        
                                                            2               7,362                  08/06/03   08/14/03    Kleinknecht Elec.                   
                                                            3              11,786                  06/27/02   07/03/02    Damiano GC Ent.                     
                                                            3              19,646                  08/06/03   08/14/03    Klienknecht Elec.                   
                                                            3              10,835                  10/07/03   10/27/03    Chevalley & Wallace Plumbing        
                                                            3              14,700                  10/07/03   10/27/03    JNS Heating                         
                                                            4              18,039                  02/19/03   03/06/03    Damiano GC Ent.                     
                                                            4              13,482                  08/06/03   08/14/03    Klienknecht Elec.                   
                                                            4              16,072                  10/07/03   10/27/03    JNS Heating                         
                                                            5              36,000                  02/19/03   03/06/03    Damiano GC Ent.                     
                                                            5              15,575                  08/06/03   08/14/03    Klienknecht Elec.                   
                                                            5              -3,860                  09/27/04   12/24/04    JNS Heating                         
                                                            6              11,628                  02/19/03   03/06/03    Damiano GC Ent.                     
                                                            6              34,500                  08/06/03   08/14/03    Klienknecht Elec.                   
                                                            6             -11,800                  09/27/04   12/24/04    JNS Heating                         
                                                            7              28,968                  02/19/03   03/06/03    Damiano GC Ent.                     
                                                            7               1,881                  08/06/03   08/14/03    Kleinknecht Elec.                   
                                                            8              17,849                  02/19/03   03/06/03    Damiano GC Ent.                     
                                                            8              36,000                  10/07/03   10/27/03    Kleinknecht Elec.                   
                                                            9              18,638                  02/19/03   03/24/03    Damiano GC Ent.                     
                                                            9              -2,749                  10/07/03   10/27/03    Kleinknecht Elec.                   
 
05-0408   Reconstruction               0-010-014  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -14,257                  02/05/08   03/08/08    LASER INDUSTRIIES                   
 
06-0818   Reconstruction               0-010-015  05/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,160                  11/24/08   05/15/09    JNS HEATING SERVICES, INC.          
 
09-1264   Reconstruction               0-010-016  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1262   Reconstruction               0-010-017  05/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1-001        -50,300                  01/03/17   01/09/17    WB Contracting Corp.                
 
15-0970   Reconstruction               0-010-018  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1301   Reconstruction               0-010-020  09/14/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E001           -2,500                  03/13/19   03/14/19    PALACE ELECTRICAL CONTRACTORS, INC. 
 
15-1740   Reconstruction               0-010-021  05/05/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001         -42,611                  11/01/18   11/29/18    STALCO CONSTRUCTION INC             
                                                            H-001           3,971                  03/09/18   03/29/18    Inshallah Mechanical Corporation    
                                                            H-001          -4,125                  11/01/18   11/09/18    JNS HEATING SERVICE INC             
                                                            H-002          12,156                  11/01/18   11/09/18    INSHALLAH MECHANICAL CORP           
                                                            H-003             957                  11/01/18   11/09/18    INSHALLAH MECHANICAL CORP           
                                                            P-001          28,016                  07/27/18   02/04/20    Ambrosio & Company, Inc.            
 
16-0541   Reconstruction               0-010-022  06/19/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1314   Reconstruction               0-010-023  06/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           8,774                  06/04/21   03/10/22    SUNRISE ELECTRICAL SERVICES         
                                                            G-001         -21,421                  11/12/19   11/22/19    WEB CONSTRUCTION CORP.              
                                                            H-001         -12,000                  06/27/19   07/01/19    K&G MECHANICAL, INC.                
                                                            P-001          -5,000                  10/15/19   10/18/19    AMBROSIO & COMPANY                  
 
18-0965   Reconstruction               0-010-024  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1197EP Energy Project               0-010-E01  05/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0638FP Reconstruction               0-010-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Coleman Elementary:
90-1405   Reconstruction               0-011-004  06/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0053   Reconstruction               0-011-005  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0749   Reconstruction               0-011-006  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0352   Reconstruction               0-011-007  11/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0790   Reconstruction               0-011-009  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,197                  04/12/04   04/27/04    WHM Plumbing                        
                                                            1                  74                  04/12/04   04/27/04    All Service Elec.                   
                                                            1               6,221                  04/12/04   04/27/04    Ultimate Power                      
                                                            1              -2,679           1,264  12/23/04   03/27/06    Lipsky Enterprises                  
                                                            2                -500                  10/07/03   10/27/03    Lipsky Ent.                         
 
00-0176   Reconstruction               0-011-010  09/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,521                  03/05/02   04/18/02    JNS Heating Service                 
                                                            1              -4,000                  03/05/02   04/18/02    LEB Elec.                           
 
05-0409   Reconstruction               0-011-011  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              97,530                  10/01/08     /  /      HVAC,INC                            
                                                            1             -65,783                  10/21/08   11/19/08    ADJO CONTRACTING CORP.              
 
05-0930   Reconstruction               0-011-012  07/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -16,095                  02/09/09   07/07/09    KENSTAR CONSTRUCTION                
 
09-1265   Reconstruction               0-011-013  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1278   Reconstruction               0-011-014  10/14/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1363   Reconstruction               0-011-015  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -25,000                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
 
15-1741   Reconstruction               0-011-016  03/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -10,257                  03/13/19   03/15/19    WEB CONSTRUCTION CORP.              
                                                            H-001         -15,000                  10/15/19   10/18/19    DOMINION CONSTRUCTION CORP.         
 
18-0966   Reconstruction               0-011-017  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0632FP Reconstruction               0-011-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stagecoach Rd. Elementary:
92-0054   Reconstruction               0-012-003  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0791   Reconstruction               0-012-005  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  04/12/04   04/27/04    WHM Plumbing                        
                                                            1              -5,000                  04/12/04   04/27/04    Long Island Mechanical              
                                                            1                -101                  04/12/04   04/27/04    All Service Electric                
                                                            1                -850                  12/23/04   02/01/05    Lipsky Enterprises                  
                                                            2               2,261                  10/07/03   10/27/03    Lipsky Ent.                         
 
00-0177   Reconstruction               0-012-006  09/28/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0410   Reconstruction               0-012-008  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -52,540                  10/21/08   11/12/08    ADJO CONTRACTING CORP.              
 
06-0794   Reconstruction               0-012-009  05/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,713                  11/24/08   04/03/09    W.J. NORTHRIDGE                     
 
09-1266   Reconstruction               0-012-010  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1742   Reconstruction               0-012-011  03/27/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -48,130                  03/13/19   03/15/19    STALCO CONTRACTING, INC             
 
14-1364   Reconstruction               0-012-012  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -25,000                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
                                                            G1-001         -5,000                  05/15/17   05/18/17    Mt. Olympos Restoration, Inc.       
 
15-0940   Reconstruction               0-012-013  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0967   Reconstruction               0-012-014  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0634FP Reconstruction               0-012-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Eugene Auer Elementary School:
90-1406   Reconstruction               0-013-003  06/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1424   Reconstruction               0-013-004  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0750   Reconstruction               0-013-006  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0351   Reconstruction               0-013-007  11/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0792   Reconstruction               0-013-008  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,196                  04/12/04   04/27/04    WHM Plumbing                        
                                                            1               6,221                  04/12/04   04/27/04    Ultimare Power                      
                                                            1               2,822                  04/12/04   04/27/04    All Service Electric                
                                                            1              -2,467           1,265  12/23/04   03/27/06    Lipsky Enterprises                  
                                                            2                -500                  10/07/03   10/27/03    Lipsky Ent.                         
 
05-0411   Reconstruction               0-013-010  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1             -19,096                  05/01/07   05/15/07    Adjo Contracting                    
                                                            1              15,296                  10/01/08     /  /      H.V.A.C,INC                         
                                                            2             -62,164                  10/21/08   11/19/08    ADJO CONTRACTING CORP.              
 
05-0931   Reconstruction               0-013-011  07/20/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1267   Reconstruction               0-013-012  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1279   Reconstruction               0-013-013  10/14/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1365   Reconstruction               0-013-014  03/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1743   Reconstruction               0-013-015  03/24/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001           -1,195                  04/05/19   04/25/19    WEB CONSTRUCTION CORP.              
                                                            H-001         -10,783                  10/15/19   10/18/19    DOMINION CONSTRUCTION CORP.         
 
18-0968   Reconstruction               0-013-016  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0627FP Reconstruction               0-013-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jericho Elementary:
92-0055   Reconstruction               0-014-003  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0030   Reconstruction               0-014-004  07/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1393   Reconstruction               0-014-005  05/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0419   Reconstruction               0-014-006  11/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0793   Reconstruction               0-014-007  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -123                  04/12/04   04/27/04    Long Island Mechanical              
                                                            1               2,281                  04/12/04   04/27/04    Hirsch Co                           
                                                            1              15,174                  04/12/04   04/27/04    All Service Electric                
                                                            1               2,516                  11/26/04   03/21/05    Lipsky Enterprise                   
                                                            2               1,646                  10/07/03   10/27/03    Lipsky Ent.                         
                                                            2              -1,300                  04/12/04   04/27/04    Long Island Mechanical              
 
05-0412   Reconstruction               0-014-008  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,993                  10/18/07   10/23/07    MAJESTIC PLUMBING & CONSULTING CORP.
                                                            1              36,461                  11/24/08   04/03/09    ADJO CONTRACTING CORP.              
                                                            2                 546                  06/09/08   08/26/08    MAJESTIC PLUMBING & CONTRACTING     
 
06-0795   Reconstruction               0-014-009  05/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  02/09/09   06/05/09    ROLANDS ELECTRIC                    
 
09-1268   Reconstruction               0-014-010  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1744   Reconstruction               0-014-011  03/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001           12,991                  03/13/19   03/15/19    WEB CONSTRUCTION CORPORATION        
 
14-1366   Reconstruction               0-014-012  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -25,000                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
 
15-0938   Reconstruction               0-014-013  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0969   Reconstruction               0-014-014  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0630FP Reconstruction               0-014-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Centereach High School:
90-1598   Reconstruction               0-015-003  06/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1775   Reconstruction               0-015-004  07/26/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0744   Reconstruction               0-015-005  02/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0056   Reconstruction               0-015-006  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1129   Reconstruction               0-015-007  06/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1189   Reconstruction               0-015-008  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1178   Reconstruction               0-015-009  04/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0279   Reconstruction               0-015-010  11/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0794   Reconstruction               0-015-011  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,545                  11/14/02   01/08/03    Long Island Mech.                   
                                                            1               2,755                  02/19/03   03/06/03    McDowell Elec.                      
                                                            1              23,946                  08/06/03   08/14/03    Kenstar Const.                      
                                                            1              -4,708                  04/12/04   04/27/04    WHM Plumbing                        
                                                            1               2,510                  05/11/04   05/14/04    Nickerson Corp                      
                                                            2              22,481                  08/06/03   08/14/03    Kenstar Const.                      
                                                            2              -3,000                  04/12/04   04/27/04    WHM Plumbing                        
                                                            2              -7,064                  04/12/04   04/27/04    Long Island Mech.                   
                                                            3              11,418                  10/07/03   10/27/03    Kenstar Const.                      
                                                            4               9,800                  10/07/03   10/27/03    Kenstar Const.                      
 
01-1346   Reconstruction               0-015-013  09/19/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,555                  04/12/04   05/03/04    Rosemar Construction                
 
05-0413   Reconstruction               0-015-015  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,268                  02/06/08   04/04/08    Laser Industries, Inc.              
 
06-0819   Reconstruction               0-015-016  05/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,112                  12/08/08   05/19/09    WHM PLUMBING & HEATING CONTRACTORS  
                                                            1              18,112                  01/09/09   04/03/09    W.J. NORTHRIDGE                     
                                                            1              18,842                  01/20/09   05/05/09    ROLANDS ELECTRIC                    
                                                            1             -15,300                  03/03/09   06/02/09    ELDOR CONTRACTING CORPORATION       
                                                            2              18,446                  11/24/08     /  /      ROLANDS ELECTRIC                    
                                                            2              15,942                  01/20/09   05/05/09    W.J. NORTHRIDGE                     
                                                            3               7,086                  11/24/08   05/15/09    ROLANDS ELECTRIC                    
                                                            3              17,359                  01/20/09   05/05/09    W.J. NORTHRIDGE                     
                                                            4              15,732                  11/26/08   05/15/09    ROLANDS ELECTRIC                    
                                                            5              15,000                  11/26/08   05/15/09    ROLANDS ELECTRIC                    
                                                            6              -7,500                  02/09/09   06/08/09    ROLANDS ELECTRIC                    
 
09-1269   Reconstruction               0-015-017  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1263   Reconstruction               0-015-019  05/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1-001         10,000                  04/26/17   05/12/17    Sea Breeze General Construction     
                                                            G2-001         16,659                  04/26/17   05/12/17    LandTek Group, Inc.                 
 
15-0971   Reconstruction               0-015-020  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0563   Reconstruction               0-015-022  04/04/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -20,000                  11/07/16   11/22/16    ABCD Construction Corp.             
 
15-0482   Additions and Alterations    0-015-023  09/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          25,000                  10/31/18   11/26/18    PALACE ELECTRICAL CONTRACTORS INC   
                                                            E-003          -2,392                  03/02/20   06/29/20    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            E002           19,725                  03/07/19   03/14/19    PALACE ELECTRICAL CONTRACTORS, INC  
                                                            G-001          34,458                  03/09/20   07/06/20    CAPOBIANCO, INC.                    
                                                            G-002          46,408                  11/12/19   11/27/19    CAPOBIANCO, INC.                    
                                                            G-003          10,513                  03/02/20   06/30/20    CAPOBIANCO, INC.                    
                                                            H-001         -43,800                  06/27/19   07/02/19    JNS HEATING SERVICE, INC.           
                                                            H-002           2,825                  11/12/19   11/20/19    JNS HEATING SERVICE, INC.           
                                                            P-001          10,441                  10/31/18   11/26/18    HIRSCH & CO LLC                     
                                                            p-002           8,714                  02/18/22   02/18/22    HIRSCH & CO. LLC.                   
 
17-0196   Reconstruction               0-015-024  05/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          -7,135                  02/07/22   02/08/23    Eldor Const Corp                    
 
16-0540   Reconstruction               0-015-025  06/19/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1599   Reconstruction               0-015-026  06/13/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E001           19,379                  06/04/21   03/10/22    Sunrise Electrical Service          
                                                            P-001           2,148                  06/18/20   07/15/20    AMBROSIO & COMPANY, INC.            
 
18-0958   Reconstruction               0-015-027  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0898   Reconstruction               0-015-028  04/08/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1023   Reconstruction               0-015-030  03/17/22  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1189EP Energy Project               0-015-E01  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0636FP Reconstruction               0-015-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Lane Memorial Elementary:
93-0869   Reconstruction               0-016-006  04/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0795   Reconstruction               0-016-008  04/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0414   Reconstruction               0-016-011  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -26,696                  10/21/08   11/19/08    ADJO CONTRACTING CORP.              
                                                            1                 480                  11/24/08   02/05/09    HVAC, INC.                          
                                                            1             -16,338                  12/08/08   01/12/09    MAINLINE ELECTRIC                   
 
05-0932   Reconstruction               0-016-012  07/20/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1270   Reconstruction               0-016-013  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0540   Reconstruction               0-016-014  09/12/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          -8,080                  11/05/18   11/26/18    PALACE ELECTRICAL CONTRACTORS INC   
                                                            G-001          20,200                  03/13/19   03/21/19    FIDELE CONSTRUCTION, INC.           
                                                            H-001          -4,700                  08/31/17   10/04/17    Rocon Plumbing & Heating, Corp.     
                                                            P-001         -12,885                  04/23/18   05/31/18    Hirsch & Co. LLC                    
 
15-1302   Reconstruction               0-016-015  10/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E001           -1,055                  03/13/19   03/14/19    PALACE ELECTRICAL CONTRACTORS, INC  
 
14-1368   Reconstruction               0-016-016  03/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G001          -35,000                  03/13/19   03/15/19    ARROW STEEL WINDOW CORPORATION      
 
15-0939   Reconstruction               0-016-017  09/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0197   Reconstruction               0-016-018  05/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          -4,610                  02/07/22   02/08/23    Eldor Const Corp                    
 
17-1477   Reconstruction               0-016-019  06/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001           1,755                  03/13/19   03/14/19    FIDELE CONSTRUCTION, INC.           
                                                            G-002               0                  10/15/19   10/18/19    FIDELE CONSTRUCTION, INC.           
 
18-0970   Reconstruction               0-016-020  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0631FP Reconstruction               0-016-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Trans Admin Bldg:
93-1190   Reconstruction               1-004-001  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1494   Reconstruction               1-004-002  06/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1271   Reconstruction               1-004-005  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0971   Reconstruction               1-004-006  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
09-1272   Reconstruction               1-022-004  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0972   Reconstruction               1-022-005  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Double Modular #1 @ Transp. Bldg.:
98-1745   New Construction             1-024-001  10/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1273   Reconstruction               1-024-002  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Double Modular #2 @ Transp. Bldg.:
98-1746   New Construction             1-025-001  10/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1274   Reconstruction               1-025-002  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Trans./Student Services:
09-1275   Reconstruction               1-028-002  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pre-Engineered Storage:
99-0661   New Construction             2-026-001  03/15/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Garage:
90-1028   Additions and Alterations    3-007-001  05/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1276   Reconstruction               3-007-004  04/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0973   Reconstruction               3-007-005  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Grounds/Maintenance Storage Bldg.:
05-0415   New Construction             3-017-001  01/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,000                  05/08/07     /  /      Majestic Plumbing Heating           
                                                            2                -600                  02/09/09   04/23/09    MAJESTIC PLUMBING & CONSULTING CORP.
 
18-0974   Reconstruction               3-017-002  07/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXTransporation Garage(was 3-007):
06-1289   Reconstruction               5-007-001  12/10/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0617   Reconstruction               5-007-003  02/12/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,100                  04/11/11   05/10/11    CONSTRUCTION ENTERPRISES            
                                                            2              -3,030                  07/06/11   07/28/11    G. CONSTRUCTION ENTERPRISES         
 

          Bus Garage / Transportation Garage:
10-0404   New Construction             5-032-001  04/11/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle Country Public Library:
92-0447   Reconstruction               6-020-001  12/16/92  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0072   Additions and Alterations    6-020-002  01/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0104   Reconstruction               6-020-003  07/30/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1503   Reconstruction               6-020-004  07/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1346   Additions and Alterations    6-020-005  08/16/11  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1720   Reconstruction               6-020-006  09/21/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mid Country Cultural Center:
00-0070   Additions and Alterations    6-021-001  12/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1108   Additions and Alterations    6-021-002  11/21/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ Centereach High School:
05-0416   New Construction             7-029-001  01/19/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ Newfield High School:
05-0417   New Construction             7-030-001  01/19/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ticket Booth @ Newfield HS:
05-0418   New Construction             7-031-001  01/19/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Comfort Station @ CHS:
17-1600   New Construction             7-033-001  06/13/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Comfort Station @ NHS:
17-1799   New Construction             7-034-001  06/20/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
96-0439   Reconstruction               7-999-001  12/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1084   Reconstruction               7-999-002  05/18/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1740   Reconstruction               7-999-003  09/16/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1821   Reconstruction               7-999-004  07/11/01  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1253   Reconstruction               7-999-006  07/07/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,485                  03/31/08   04/01/08    ASR ELECTRICAL CONTRACTING INC.     
                                                            1              16,182                  11/24/08   02/05/09    INTELLI-TEC SECURITY SERVICES LLC   
 
14-1460   Reconstruction               7-999-008  05/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0158   Reconstruction               7-999-009  12/21/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0639   Reconstruction               7-999-010  01/21/20  NO CHANGE ORDERS ON ELECTRONIC FILE

LONGWOOD CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-12-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Chas. E. Walters Elementary:
90-1607   Reconstruction               0-002-003  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0242   Reconstruction               0-002-004  09/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0415   Reconstruction               0-002-005  12/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0942   Reconstruction               0-002-007  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0580   Reconstruction               0-002-008  05/04/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -30,544                  03/25/02   03/26/02    Arch. Window                        
 
99-0917   Additions and Alterations    0-002-009  06/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,864                  06/05/02   06/05/02    Mainline Elec.                      
                                                            1               2,899                  01/29/01   01/30/01    ARA Plumbing                        
                                                            1             -80,622                  11/06/02   01/14/03    JNS Heating                         
                                                            1             -59,178                  11/06/02   01/14/03    Pav-Lak Industries                  
                                                            2               1,989                  01/29/01   01/30/01    ARA Plumbing                        
                                                            2               7,151                  05/15/01   05/16/01    Mainline Elec.                      
                                                            3               3,824                  08/02/01   08/03/01    ARA Plumbing                        
                                                            3             -32,778                  08/27/02   10/24/02    Mainline Elec.                      
                                                            4               1,948                  04/02/02   04/29/02    ARA Plumbing                        
 
07-0984   Reconstruction               0-002-010  12/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0164   Reconstruction               0-002-011  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,546                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            2                 650                  03/29/11   04/22/11    J.P. DALY & SONS INC                
 
12-0776   Reconstruction               0-002-012  04/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0790   Reconstruction               0-002-013  04/23/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,000                  10/29/14   11/05/14    Baruti Construction Corp.           
                                                            1              -9,000                  10/29/14     /  /      Baruti Construction Corp.           
 
17-1445   Reconstruction               0-002-015  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1398   Reconstruction               0-002-016  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  01/31/22   02/08/23    HVAC Inc                            
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0376   Reconstruction               0-002-017  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   01/29/21    PATRIOT ORGANIZATION                
 
21-0907   Reconstruction               0-002-018  03/31/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,182                  07/24/23   12/27/23    ROLANDS ELECTRIC                    
 
21-1663FA Reconstruction               0-002-019  07/20/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,330                  07/24/23   12/27/23    HIRSCH & CO                         
 
21-1111   Reconstruction               0-002-020  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Middle Island Primary School:
90-1608   Reconstruction               0-004-004  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0477   Reconstruction               0-004-006  12/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0416   Reconstruction               0-004-007  12/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1545   Reconstruction               0-004-008  05/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0581   Reconstruction               0-004-009  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0943   Reconstruction               0-004-010  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1057   Additions and Alterations    0-004-012  08/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,043                  03/15/01   03/16/01    Eldor Contracting                   
                                                            1             -12,328                  11/07/02   11/07/02    Pav-Lak Industries                  
                                                            1              32,435                  12/17/02   12/20/02    Thermo Tech Combustion              
                                                            1               1,571                  06/26/03   06/30/03    Snow Industries                     
                                                            2              25,598                  12/27/01   02/28/02    Eldor Contracting                   
 
07-0985   Reconstruction               0-004-013  12/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0172   Reconstruction               0-004-014  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,568                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            2                 650                  03/29/11   04/22/11    J.P. DALY & SONS INC                
 
12-0777   Reconstruction               0-004-015  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  07/24/17   08/21/17    Cardinal Control Systems, Inc.      
 
13-0758   Reconstruction               0-004-016  05/13/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1446   Reconstruction               0-004-017  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1399   Reconstruction               0-004-018  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0377   Reconstruction               0-004-019  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   01/22/21    PATRIOT ORGANIZATION                
                                                            2              19,122                  07/09/21   01/11/22    Patriot Organization                
 
21-1664FA Reconstruction               0-004-021  07/20/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,455                  02/17/23     /  /      HIRSCH & CO INC                     
 
21-0908   Reconstruction               0-004-022  03/31/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1112   Reconstruction               0-004-023  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Main Street Building (fmly 1-005):
17-0257   Reconstruction               0-005-001  08/25/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1376   Reconstruction               0-005-004  08/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -71,900                  10/29/18   11/26/18    MORE CONSULTING CORP                
 

          Coram Elementary:
90-1609   Reconstruction               0-007-002  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0478   Reconstruction               0-007-004  12/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0417   Reconstruction               0-007-005  12/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0944   Reconstruction               0-007-007  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0582   Reconstruction               0-007-008  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1058   Additions and Alterations    0-007-010  08/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 745                  05/03/01   01/08/02    Eldor Contracting                   
                                                            1               1,300                  12/16/01   12/17/01    JNS Heating                         
                                                            1               4,561                  05/15/01   05/16/01    Manning Plumbing                    
                                                            1               5,485                  01/29/01   01/30/01    MH Kane Const.                      
                                                            2               2,261                  11/29/01   02/25/02    Manning Plumbing                    
                                                            2               1,913                  06/05/02   06/05/02    Eldor Contracting                   
                                                            2              -5,301                  06/30/03   07/03/03    MH Kane Const.                      
                                                            3               4,645                  05/06/02   05/07/02    Eldor Contracting                   
 
07-0986   Reconstruction               0-007-011  12/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0165   Reconstruction               0-007-012  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -12,900                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
 
12-0778   Reconstruction               0-007-013  04/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1447   Reconstruction               0-007-015  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1400   Reconstruction               0-007-016  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0378   Reconstruction               0-007-017  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   02/11/21    PATRIOT ORGANIZATION                
                                                            2              26,625                  07/09/21   01/11/22    Patriot Organization                
 
21-1665FC Reconstruction               0-007-019  07/20/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,455                  02/17/23   11/27/23    HIRSCH & CO INC                     
 
21-1113   Reconstruction               0-007-020  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ridge Elementary:
90-1610   Reconstruction               0-008-003  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0418   Reconstruction               0-008-005  12/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1546   Reconstruction               0-008-006  05/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0945   Reconstruction               0-008-008  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0583   Reconstruction               0-008-009  05/04/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             155,120                  03/01/02   03/01/02    Eldor Contracting                   
                                                            3              13,487                  03/01/02   03/01/02    Pav-Lak Industries                  
                                                            4              66,333                  03/01/02   03/01/02    Pav-Lak Industries                  
 
99-1059   Additions and Alterations    0-008-010  08/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,327                  11/06/02   12/02/02    JNS Heating                         
                                                            1              14,436                  11/06/02   12/02/02    Manning Plumbing                    
                                                            1               2,821                  11/06/02   12/02/02    Hempstead Elec.                     
                                                            2              -2,690                  06/30/03   07/03/03    Manning Plumbing                    
                                                            3              66,415                  07/14/03   07/17/03    MH Kane Const.                      
 
07-0987   Reconstruction               0-008-011  12/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0163   Reconstruction               0-008-012  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -12,840                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
 
12-0779   Reconstruction               0-008-013  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  07/24/17   08/21/17    Cardinal Control Systems, Inc.      
 
17-1448   Reconstruction               0-008-014  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1401   Reconstruction               0-008-015  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0379   Reconstruction               0-008-016  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   02/11/21    PATRIOT ORGANIZATION                
 
21-1666FC Reconstruction               0-008-017  07/20/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,455                  02/17/23     /  /      HIRSCH & CO INC                     
 
21-0909   Reconstruction               0-008-018  03/31/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,178                  07/24/23   12/27/23    ROLANDS ELECTRIC                    
 
21-1114   Reconstruction               0-008-019  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1641   Reconstruction               0-008-020  05/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Longwood Junior High School:
90-1611   Reconstruction               0-009-002  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0174   Reconstruction               0-009-003  08/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0946   Reconstruction               0-009-005  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0605   Reconstruction               0-009-006  02/17/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              88,296                  03/01/02   03/01/02    Eldor Contracting                   
                                                            2             129,270                  12/20/01   01/08/02    Preferred Plumbing                  
                                                            5              20,100                  12/20/01   01/08/02    Roland's Elec.                      
 
99-0269   Additions and Alterations    0-009-007  04/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,932                  06/18/01   01/08/02    Preferred Plumbing                  
                                                            1              15,025                  04/07/03   04/07/03    Major Systems                       
                                                            2              40,930          40,400  11/06/02   12/02/02    Major Systems                       
                                                            3              18,379                  06/18/01   01/08/02    Roland's Electric                   
                                                            3              33,814                  11/01/02   06/29/04    Preferred Plumbing                  
                                                            3              15,707           4,141  12/12/02   11/26/03    Major Systems                       
                                                            4               6,435                  06/18/01   01/08/02    Roland's Electric                   
                                                            4               2,567                  11/03/03   11/12/03    Preferred Plumbing                  
                                                            4               9,789                  05/02/03   05/21/03    Major Systems                       
                                                            5              72,007                  12/27/01   05/22/02    Frendolph Const.                    
                                                            6              36,384                  06/05/02   06/05/02    Roland's Electric                   
                                                            6             231,006          93,709  12/30/02   06/29/04    Frendolph Const.                    
                                                            7              90,417                  11/06/02   06/29/04    Roland's Electric                   
                                                            8              28,195                  12/12/02   11/12/03    Roland's Electric                   
 
05-0137   Reconstruction               0-009-008  08/29/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              14,620                  07/24/06   12/27/06    JNs heating Service                 
                                                            2              -4,000                  02/05/07   03/01/07    JNS heating Service                 
 
08-0170   Reconstruction               0-009-010  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              39,330                  03/01/10   05/05/10    MAJESTIC PLUMBING & CONSULTING CORP 
                                                            1               6,546                  06/18/10   08/18/10    TULGER CONSTRUCTION CORP            
                                                            1             -95,272                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -5,463                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            1              -1,344                  06/11/12   11/09/12    LASER INDUSTRIES INC                
                                                            2                 239                  03/29/11   04/22/11    J.P. DALY & SONS INC                
                                                            2               2,789                  05/17/12   10/17/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            3                 650                  03/29/11   04/22/11    J.P. DALY & SONS INC                
 
12-0780   Reconstruction               0-009-012  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -604                  10/31/16   01/11/17    Facility Solutions Group, Inc.      
 
12-0791   Reconstruction               0-009-014  04/23/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -8,021                  02/18/14   03/17/14    Laser Industries, Inc.              
                                                            1              -5,200                  10/29/14   11/05/14    Baruti Construction Corp.           
                                                            1              -5,200                  10/29/14     /  /      Baruti Construction Corp.           
 
13-0759   Reconstruction               0-009-015  05/13/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0870   Reconstruction               0-009-016  01/02/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -2,304                  06/12/19   07/02/19    STATEWIDE ROOFING, INC.             
 
17-1449   Reconstruction               0-009-017  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0380   Additions and Alterations    0-009-018  04/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              46,665                  06/12/20   08/06/20    Metro Group                         
                                                            1             -10,000                  09/28/20   11/06/20    KG MECHANICAL, INC.                 
                                                            1             -10,000                  01/04/21   02/25/21    J.P. DALY & SONS, INC.              
                                                            1             -55,000                  06/21/22   04/27/23    HVAC Inc                            
                                                            2              75,900                  07/27/20   10/23/20    METRO GROUP OF L.I.                 
 
18-0381   Reconstruction               0-009-019  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   01/29/21    PATRIOT ORGANIZATION                
 
21-1667FA Reconstruction               0-009-020  07/20/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1115   Reconstruction               0-009-021  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0428SC Visual Structural Inspection 0-009-SC1  11/04/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0431SC Visual Structural Inspection 0-009-SC2  11/04/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Longwood Middle School:
90-1612   Reconstruction               0-010-003  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0175   Reconstruction               0-010-004  08/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0947   Reconstruction               0-010-006  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0606   Reconstruction               0-010-007  02/17/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -98,911                  06/27/01   01/10/02    Arch. Window Mfg. Corp.             
                                                            4             109,181                  12/04/01   04/05/02    Angelo Capobianco                   
 
99-0747   Additions and Alterations    0-010-008  04/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,549                  12/14/00   12/14/00    Jack Hirsch                         
                                                            1               4,391                  11/02/00   11/03/00    Gordon Seaman                       
                                                            1              87,349                  10/05/00   10/06/00    Angelo Capobianco                   
                                                            2              23,640                  12/27/01   05/22/02    Gordon Seaman                       
                                                            2               3,015                  06/05/02   06/05/02    Jack Hirsch                         
                                                            2              19,050                  12/13/00   12/14/00    Angelo Capobianco                   
                                                            3              30,944                  01/29/01   01/30/01    Angelo Copabianco                   
                                                            5             -89,043                  12/12/02   01/08/03    Angelo Capobianco                   
 
03-0033   Reconstruction               0-010-009  07/11/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -20,800                  06/21/04   09/27/04    Ara Plumbing                        
 
08-0169   Reconstruction               0-010-010  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -16,940                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -6,400                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            2                 650                  03/29/11     /  /      J.P. DALY & SONS INC                
 
12-0781   Reconstruction               0-010-011  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              51,512                  06/30/16   08/24/17    Botto Mechanical Corporation        
                                                            1            -200,000                  02/27/17   05/13/19    Bollermatic Welding Industries, Inc.
                                                            1              15,417                  12/03/18   01/23/19    JNS HEATING SERVICES, INC.          
                                                            2                   0                  01/11/19     /  /      JNS HEATING SERVICES INC            
                                                            2-FINAL       -92,500                  05/08/19   05/09/19    BOILERMATIC WELDING INDUSTRIES, INC.
                                                            3-FINAL        30,941                  07/11/19   07/15/19    JNS HEATING SERVICES, INC.          
 
11-0879   Reconstruction               0-010-012  05/18/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,998                  03/04/14   04/15/14    Xtaire, Inc.                        
 
11-1076   Reconstruction               0-010-014  04/10/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              41,700                  09/24/12   01/25/13    STATEWIDE ROOFING                   
                                                            2             -15,000                  09/11/13   09/13/13    Statewide Roofing                   
 
12-0792   Reconstruction               0-010-015  04/23/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              -8,040                  05/19/14   05/30/14    Laser Industries, Inc.              
                                                            1             -22,000                  10/29/14     /  /      Baruti Construction Corp.           
                                                            1             -22,000                  10/29/14   11/05/14    Baruti Construction Corp.           
 
15-0566   Reconstruction               0-010-016  03/30/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -6,964                  07/20/17   07/27/17    Pella General Construction Corp.    
 
17-1450   Reconstruction               0-010-017  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0382   Reconstruction               0-010-018  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,800                  03/09/20   06/30/20    J. ANTHONY ENTERPRISES, INC.        
                                                            1              -7,500                  09/28/20   11/06/20    W.H.M. PLUMBING & HEATING           
                                                            1              -7,500                  09/28/20   11/06/20    KG MECHANICAL, INC.                 
                                                            1              -7,500                  01/04/21   02/25/21    J.P. DALY & SONS, INC.              
                                                            2             -16,874                  12/07/20   02/16/21    J. ANTHONY ENTERPRISES, INC.        
 
18-0383   Reconstruction               0-010-019  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   01/29/21    PATRIOT ORGANIZATION                
                                                            2              24,963                  07/09/21   01/11/22    Patriot Organization                
 
21-0958   Reconstruction               0-010-020  04/22/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -84,625                  08/18/22   12/11/23    Renu Contrg&Restore Inc             
                                                            1             109,000                  08/18/22     /  /      Intricate Tech Sols Ltd             
                                                            2              96,477                  11/18/22   09/07/23    RENU CONTRACTING AND RESTORATION    
                                                            2             -15,000                  07/24/23   12/27/23    INTRICATE TECH SOLUTIONS            
                                                            3             -71,294                  07/24/23     /  /      RENU CONTRACTING & RESTORATION      
 
21-1135   Reconstruction               0-010-021  02/07/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ridge Elem.Annex 1:
96-0948   Reconstruction               0-011-003  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0585   Reconstruction               0-011-004  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0659   Additions and Alterations    0-011-005  04/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             256,920                  06/17/02   07/10/02    Tromel Const.                       
                                                            1              49,574                  06/17/02   07/10/02    ARA Plumbing                        
                                                            1             180,581                  06/17/02   07/10/02    Gordon L. Seaman                    
                                                            1             214,383                  06/17/02   07/10/02    Major Systems                       
                                                            2               3,173                  12/30/02   01/08/03    Major Systems                       
                                                            2               1,427                  12/30/02   01/08/03    Tromel Const.                       
                                                            2              25,449                  12/30/02   01/09/03    ARA Plumbing                        
                                                            2F             -1,842                  12/23/03   01/08/04    Gordon L Seaman                     
                                                            3F             -6,035                  05/16/03   06/03/03    Tromel Const.                       
 
08-0167   Reconstruction               0-011-008  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,777                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            2               1,300                  03/29/11   04/22/11    J.P. DALY & SONS INC                
 
12-0782   Reconstruction               0-011-009  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,588                  01/04/16   01/21/16    FACILITY SOLUTIONS GROUP,INC        
                                                            1                -830                  07/24/17   08/21/17    Cardinal Control Systems, Inc.      
 
11-1077   Reconstruction               0-011-010  04/10/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1             150,400                  07/26/12   02/19/13    ROSEMAR CONSTRUCTION INC            
 
17-1451   Reconstruction               0-011-012  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1402   Reconstruction               0-011-013  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0384   Reconstruction               0-011-014  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   01/22/21    PATRIOT ORGANIZATION                
                                                            2              15,389                  07/09/21   01/11/22    Patriot Organization                
 
21-1116   Reconstruction               0-011-017  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Coram Primary School:
96-0949   Reconstruction               0-012-001  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0586   Reconstruction               0-012-002  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0716   Additions and Alterations    0-012-003  05/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              39,103                  04/02/02   05/06/02    Botto Mech.                         
                                                            1             319,299                  06/17/02   08/15/02    Angelo Capobianco                   
                                                            1              75,000                  06/17/02   08/15/02    Ultimate Power                      
                                                            1              61,146                  06/17/02   08/15/02    Gordon L. Seaman                    
                                                            2              31,600                  06/17/02   08/15/02    Botto Mech.                         
                                                            2              40,089                  11/06/02   01/07/03    Gordon L. Seaman                    
                                                            2              -6,240                  12/30/02   01/08/03    Angelo Capobianco                   
                                                            2              48,784                  05/16/03   05/23/03    Ultimate Power                      
                                                            3              31,961                  12/30/02   01/08/03    Botto Mech.                         
                                                            3               6,939                  03/06/03   03/24/03    Gordon L. Seaman                    
                                                            4              -3,912                  07/14/03   07/24/03    Botto Mech.                         
                                                            4F              1,498                  04/21/03   05/05/03    Gordon L. Seaman                    
 
08-0166   Reconstruction               0-012-005  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,284                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            2               1,300                  03/29/11   04/22/11    J.P. DALY & SONS INC                
 
12-0783   Reconstruction               0-012-006  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FINAL 1         3,827                  06/06/16   06/10/16    FACILITIY SOLUTIONS GROUP           
 
11-1078   Reconstruction               0-012-007  04/10/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1350   Reconstruction               0-012-008  05/13/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1452   Reconstruction               0-012-009  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1403   Reconstruction               0-012-010  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0385   Reconstruction               0-012-011  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   01/22/21    PATRIOT ORGANIZATIOB                
                                                            2              14,188                  07/09/21   05/04/23    Patriot Organization                
 
21-1117   Reconstruction               0-012-013  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Charles E. Walters Annex 1:
90-1613   Additions and Alterations    0-014-001  07/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0950   Reconstruction               0-014-003  06/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0587   Reconstruction               0-014-004  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0715   Additions and Alterations    0-014-005  05/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,864                  04/02/02   05/06/02    Eldor Contracting                   
                                                            1             416,721                  06/17/02   08/15/02    Angelo Capobianco                   
                                                            1             119,657                  06/17/02   08/15/02    Major Systems                       
                                                            1              16,077                  11/06/02   01/07/03    Snow Industries                     
                                                            2              -7,492                  06/17/02   08/15/02    Eldor Contracting                   
                                                            2              40,189                  12/12/02   01/08/03    Anelo Capobianco                    
                                                            2              12,965                  12/30/02   01/08/03    Major Systems                       
                                                            2               4,775                  07/06/04   07/09/04    Snow Industries                     
                                                            3             118,094                  06/17/02   08/15/02    Eldor Contracting                   
                                                            3             -35,854                  12/30/02   01/08/03    Angelo Capobianco                   
                                                            4               2,863                  11/06/02   01/07/03    Eldor Contracting                   
                                                            5              12,163                  12/30/02   01/08/03    Eldor Contracting                   
 
08-0168   Reconstruction               0-014-006  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,010                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
 
12-0784   Reconstruction               0-014-008  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,143                  01/04/15   01/21/16    FACLITITY SOLUTIONS SROUP,INC       
 
11-1079   Reconstruction               0-014-009  04/10/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          Longwood Sr High School:
97-0607   Reconstruction               0-015-003  02/17/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              44,623                  03/01/02   03/01/02    Thermo Tech Combustion              
 
99-0268   Additions and Alterations    0-015-005  01/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              30,004                  12/27/01   02/28/02    Pav-Lak Industries                  
                                                            1             108,584          89,914  11/19/02   11/26/03    JNS Heating                         
                                                            1             -30,000                  06/30/03   07/07/03    McHugh Specialty Furnishing         
                                                            2              53,613                  03/18/02   04/19/02    ARA Plumbing                        
                                                            2              34,771                  04/21/03   05/02/03    JNS Heating                         
                                                            3              31,920          17,652  04/02/02   11/19/02    Roland's Electric                   
                                                            3              28,603                  08/27/02   06/29/04    ARA Plumbing                        
                                                            4              95,064          48,579  06/17/02   07/10/02    Roland's Electric                   
                                                            4              75,605                  12/12/02   06/28/04    Pav-Lak Industries                  
                                                            5               6,278                  12/17/02   01/02/03    Pav-Lak Industries                  
                                                            5F             27,278                  05/16/03   06/03/03    Roland's Electric                   
 
02-2241   Reconstruction               0-015-006  05/22/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -745                  11/01/06   02/09/07    Valco Inc                           
 
04-0493   Reconstruction               0-015-007  02/09/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             103,300                  11/14/07   02/23/08    KND Licensed Electrical contracting 
                                                            2              24,930                  09/07/06   02/06/09    KND Licensed Electrical             
 
07-0988   Reconstruction               0-015-008  12/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2128   Reconstruction               0-015-009  07/16/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0173   Reconstruction               0-015-010  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -39,330                  03/01/10   05/05/10    MAJESTIC PLUMBING & CONSULTING CORP 
                                                            1             -96,623                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1               6,282                  10/22/10   11/01/10    RELLE ELECTRIC                      
                                                            1             -10,862                  09/09/11   02/13/12    J.P. DALY & SONS INC                
                                                            1              12,471                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            2              -8,591                  03/29/11   04/22/11    J.P. DALY & SONS INC                
                                                            3               5,200                  03/29/11   04/22/11    J.P. DALY & SONS INC                
 
09-0296   Reconstruction               0-015-012  11/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              23,109                  01/13/11   02/07/11    CONSTRUCTION ENTERPRISES LLC        
 
11-1443   Reconstruction               0-015-013  10/25/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -65,180                  05/19/14   05/30/14    Laser Industeries, Inc.             
                                                            1              -1,719                  06/19/14   07/23/14    P.B.X. Store                        
                                                            1(Final)       -1,985                  06/30/14   10/24/14    Valco Inc                           
 
12-0785   Reconstruction               0-015-014  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              27,301                  02/08/16   04/11/16    Facility Solutions Group, Inc.      
                                                            1            -233,500                  04/21/16   01/29/18    Boilermatic Welding Industries, Inc.
                                                            1              15,217                  12/03/18   01/23/19    JNS HEATING SERVICES, INC.          
                                                            1(FINAL)      -20,000                  12/18/17   06/05/18    JNS Heating Services, Inc.          
                                                            2             -18,000                  10/31/16   01/11/17    Facility Solutions Group, Inc.      
                                                            2             -87,495                  02/27/17   05/13/19    Bollermatic Welding Industries, Inc.
                                                            2                   0                  01/11/19     /  /      JNS HEATING SERVICES INC            
                                                            3-FINAL       -92,500                  05/08/19   05/09/19    BOILERMATIC WELDING INDUSTRIES, INC.
                                                            3-FINAL        45,303                  07/11/19   08/13/19    JNS HEATING SERVICES, INC.          
                                                            4(FINAL)       16,631                  11/25/19   12/06/19    JNS HEATING SERVICES, INC.          
 
13-0760   Reconstruction               0-015-015  05/13/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0871   Reconstruction               0-015-016  01/02/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1            -113,934                  03/09/20   07/06/20    ARROW STEEL WINDOW CORP.            
 
18-0386   Additions and Alterations    0-015-017  04/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1            -507,200                  10/10/19   10/18/19    KG MECHANICAL, INC.                 
                                                            1             -10,000                  01/04/21   02/25/21    J.P. DALY & SONS, INC.              
                                                            1             -10,962                  01/04/21   03/16/21    CONSTRUCTION CONSULTANTS OF LI, INC.
                                                            1              -2,400                  09/13/21   11/29/22    JNS Heating Service, Inc            
                                                            1             -60,000                  10/06/22   07/13/23    HVAC Inc                            
                                                            2             -10,000                  09/28/20   11/06/20    KG MECHANICAL, INC.                 
 
18-0387   Reconstruction               0-015-018  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   02/16/21    PARIOT ORGANIZATION                 
 
21-1136   Reconstruction               0-015-019  07/26/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  07/24/23   12/27/23    EASTERN INDUSTRIAL SERVICES OF NY   
 
21-1668FB Reconstruction               0-015-020  07/20/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1118   Reconstruction               0-015-021  07/26/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  01/11/23   11/16/23    HARTCORN PLUMB & HEAT INC           
                                                            1              14,642                  01/11/23   11/16/23    HARTCORN PLUMB & HEAT INC           
                                                            1               9,982                  04/10/23     /  /      INSHALLAH MECHANICAL CORP           
 
02-0429SC Visual Structural Inspection 0-015-SC1  11/04/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0430SC Visual Structural Inspection 0-015-SC2  11/04/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Charles E. Walters Annex 2:
97-0588   Reconstruction               0-017-002  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1453   Reconstruction               0-017-003  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1404   Reconstruction               0-017-004  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  01/02/19     /  /      LASER INDUSTRIES INC                
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0388   Reconstruction               0-017-005  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   02/11/21    PATRIOT ORGANIZATION                
                                                            2              14,158                  07/09/21   01/13/22    Patriot Organization                
 
21-1119   Reconstruction               0-017-008  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          W. Middle Island Annex:
97-0589   Reconstruction               0-018-001  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0660   Additions and Alterations    0-018-002  04/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,767                  07/18/02   08/28/02    Major Systems                       
                                                            1              29,919                  07/18/02   08/28/02    ARA Plumbing                        
                                                            1             360,000                  07/18/02   08/28/02    Pav-Lak Industries                  
                                                            1              41,146          26,419  08/27/02   09/24/02    Bana Elec.                          
                                                            2              20,654                  07/18/02   08/28/02    Major Systems                       
                                                            2              45,045                  07/18/02   08/28/02    ARA Plumbing                        
                                                            2             114,857                  08/16/02   09/05/02    Bana Elec.                          
                                                            2             -12,701                  12/12/02   06/28/04    Pav-Lak Industries                  
                                                            3             271,000                  07/18/02   08/28/02    Major Systems                       
                                                            3              33,399          24,728  08/16/02   09/24/02    Bana Elec.                          
                                                            3              23,749                  08/27/02   09/24/02    ARA Plumbing                        
                                                            3              51,700          51,700  03/06/03   03/19/03    Pav-Lak Industries                  
                                                            4              37,272          33,434  08/27/02   09/24/02    Bana Elec.                          
                                                            4               2,532                  11/08/02   12/11/02    Major Systems                       
                                                            4              17,844                  12/30/02   01/09/03    Pav-Lak Industries                  
                                                            4              48,802          26,995  12/30/02   01/09/03    ARA Plumbing                        
                                                            5              27,439          23,305  12/30/02   01/09/03    Bana Elec.                          
                                                            5               3,557                  12/30/02   01/09/03    Major Systems                       
                                                            5              13,002                  04/21/03   05/02/03    ARA Plumbing                        
                                                            5F              9,595                  04/01/04   06/29/04    Pav Lak Industries                  
                                                            6              11,831                  04/11/03   04/17/03    Bana Elec.                          
                                                            6               4,909                  07/14/03   07/23/03    ARA Plumbing                        
                                                            7               4,365                  06/30/03   07/07/03    Bana  Elec.                         
 
08-0171   Reconstruction               0-018-004  01/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -13,123                  10/19/10   11/01/10    J.P. DALY & SONS INC                
                                                            1              -4,800                  04/06/12   07/05/13    NEW ENGLAND SYSTEMS & SOFTWARE INC  
                                                            2               8,352                  03/29/11   04/22/11    J.P. DALY & SONS INC                
                                                            3               1,950                  03/29/11   04/22/11    J.P. DALY & SONS INC                
 
12-0786   Reconstruction               0-018-005  04/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  07/24/17   08/21/17    Cardinal Control Systems, Inc.      
                                                            FINAL 1         7,500                  06/06/16   06/20/16    FACILITY SOLUTIONS GROUP            
 
11-1080   Reconstruction               0-018-006  04/10/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1454   Reconstruction               0-018-007  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1405   Reconstruction               0-018-008  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)       -3,000                  05/22/19   05/28/19    LIBERTY CONTRACTING OF NEW YORK,LLC 
 
18-0389   Reconstruction               0-018-009  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,272                  10/01/20   01/22/21    PATRIOT ORGANIZATION                
                                                            2              13,271                  07/09/21   01/11/22    Patriot Organization                
 
21-1120   Reconstruction               0-018-012  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXCentral Admin. (DEMOLISHED):
97-0608   Reconstruction               1-001-002  02/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0390   Reconstruction               1-001-004  02/01/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Annex:
97-0609   Reconstruction               1-003-002  02/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBldgs & Grounds Office (now 0-005):
97-0610   Reconstruction               1-005-002  02/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0611   Reconstruction               1-005-003  02/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXCent Office Annex East (DEMO'D):
18-0391   Reconstruction               1-019-003  02/01/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Administration Building:
18-0392   New Construction             1-021-001  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              75,737                  07/27/20   03/29/22    BOROUGH CONSTRUCTION GROUP, LLC     
                                                            1             -10,000                  01/04/21   02/25/21    HIRSH & CO., LLC                    
                                                            2              15,000                  07/27/20   10/23/20    BOROUGH CONSTRUCTION GROUP, LLC     
                                                            3             -29,335                  11/17/22   09/19/23    BOROUGH CONSTRUCTION GROUP LLC      
 

          Maintenance Garage:
17-1406   Reconstruction               3-006-002  07/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1(FINAL)      -19,507                  09/12/19   09/13/19    PATRIOT oRGANIZATION                
 

          Public Library:
05-0195   Additions and Alterations    6-016-003  12/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0456   Reconstruction               6-016-004  10/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1229   Additions and Alterations    6-016-005  11/26/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            47,240                  09/30/15   11/03/15    Ambrosio Plumbing & Heating, Inc.   
                                                            001            15,188                  09/30/15   11/03/15    Saracino Construction Corp.         
                                                            001            48,765                  09/30/15   11/03/15    Saracino Construction Corp.         
                                                            001            55,000                  09/30/15   11/03/15    Laser Industries, Inc.              
                                                            001            31,035                  09/30/15   11/03/15    Arrow Steel Window Corporation      
                                                            001            81,000                  09/30/15   11/03/15    Palace Electrical Contractors, Inc. 
                                                            001            15,654                  09/30/15   11/03/15    Pirraglia Contracting               
                                                            001            11,113                  09/30/15   11/03/15    Island Diversified                  
                                                            001            18,050                  09/30/15   11/03/15    JV Ceramic Tile & Marble            
                                                            001            28,656                  09/30/15   11/03/15    Waverly Iron Corp.                  
                                                            001            70,000                  09/30/15   11/03/15    M.I. Concrete Inc.                  
                                                            001            26,077                  09/30/15   11/03/15    Hi-Lume Corporation                 
                                                            002            14,497                  09/30/15   11/03/15    Saracino Construction Corp.         
                                                            002             2,928                  09/30/15   11/03/15    Laser Industries, Inc.              
                                                            002             7,281                  09/30/15   11/03/15    Pirraglia Contracting               
                                                            002             2,625                  09/30/15   11/03/15    M.I. Concrete Inc.                  
                                                            003            14,087                  09/30/15   11/04/15    Ambrosio Plumbing & Heating, Inc.   
                                                            003            22,195                  09/30/15   11/03/15    Laser Industries, Inc.              
                                                            003             8,371                  09/30/15   11/03/15    Pirraglia Contracting               
                                                            004           191,784                  09/30/15   11/03/15    Laser Industries, Inc.              
                                                            004            22,863                  09/30/15   11/03/15    Pirraglia Contracting               
 
09-0072   Reconstruction               6-016-006  08/11/09  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0116   Reconstruction               6-016-007  08/16/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Co-Gen Building:
12-0787   New Construction             7-020-001  04/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
97-0745   Reconstruction               7-999-002  03/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1288   Reconstruction               7-999-003  05/27/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,800                  10/24/16   01/29/18    CSDNET                              
                                                            2              16,144                  10/24/16   08/22/17    CSDNET                              
 
17-0718   Reconstruction               7-999-004  05/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE

SOUTH MANOR UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-21-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          South Street School:
00-1617   Additions and Alterations    0-001-001  06/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,087                  03/22/02   04/29/02    Pioneer Construction                
 
02-2018   Additions and Alterations    0-001-002  06/04/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              32,487                  09/13/04   12/24/04    Laser Industries                    
 

          South St. Portables:
98-1413   Reconstruction               0-002-001  08/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dayton Ave. School:
90-1360   Alterations                  0-003-002  05/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1412   Reconstruction               0-003-004  08/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular Building:
01-0714   New Construction             0-012-001  03/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,500                  11/15/02   12/09/02    Island Int'l. Industries            
 

          Modular Building #2:
01-0715   New Construction             0-013-001  03/27/02  NO CHANGE ORDERS ON ELECTRONIC FILE

PATCHOGUE-MEDFORD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-24-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Bay Elementary School:
98-0650   Reconstruction               0-001-006  01/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1416   Additions and Alterations    0-001-007  01/25/06  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0471   Reconstruction               0-001-008  01/03/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1264   Reconstruction               0-001-009  04/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -99,830                  02/11/02   03/25/02    JP Hunter                           
 
01-1177   Reconstruction               0-001-010  11/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,073                  01/13/04   01/26/04    Bain Heating                        
 
13-0195   Reconstruction               0-001-011  10/21/14  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1424   Reconstruction               0-001-012  10/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,500                  03/05/04   03/15/04    Jaidan Enterprises                  
                                                            1              -3,735                  02/01/05   02/08/05    Pella General Construction          
 
01-1398   Reconstruction               0-001-013  06/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,000                  06/05/03   06/10/03    JP Hunter Enterprises               
 
03-0044   Reconstruction               0-001-014  07/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0087   Reconstruction               0-001-015  12/12/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              2,396                  08/18/08   05/15/09    BOTTO MECHANICAL CORPORATION        
                                                            1              -3,050                  02/24/09   06/11/09    ARROW STEEL WINDOW CORP.            
                                                            1              12,608                  02/24/09   06/09/09    JNS HEATING SERVICE, INC.           
                                                            1                   0                  05/04/09   07/28/09    CONSTRUCTION CONSULTANTS OF LI      
                                                            1               7,296                  05/04/09   07/31/09    MADHUE CONTRACTING INC              
                                                            2              15,761                  05/04/09   07/31/09    MADHUE CONTRACTING INC              
                                                            2 R             8,040                  05/04/09   07/31/09    JNS HEATING SERVICE INC             
                                                            3               5,922                  05/04/09   07/31/09    MADHUE CONTRACTING INC              
                                                            3               4,123                  05/04/09   09/23/09    JNS HEATING SERVICE, INC            
 
08-0056   Additions and Alterations    0-001-016  12/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              2,200                  11/05/10   11/10/10    HARTCORN PLUMBING & HEATING INC     
                                                            01             -5,000                  03/22/11   04/08/11    RELLE ELECTRIC CORP                 
                                                            02              2,187                  11/05/10   11/10/10    HARTCORN PLUMBING & HEATING INC     
                                                            03              1,824                  01/26/11   02/24/11    HARTCORN PLUMBING & HEATING INC     
                                                            1               9,017                  05/19/11   07/15/11    M.H. KANE CONSTRUCTION CORP         
                                                            2              19,675                  10/11/11   01/18/12    M.H. KANE CONSTRUCTION CORP         
                                                            3              -8,650                  06/10/11   07/15/11    M.H. KANE CONSTRUCTION CORP         
                                                            4               3,650                  09/01/11   11/08/11    HARTCORN PLUMBING & HEATING INC     
 
12-0372   Reconstruction               0-001-017  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0859   Reconstruction               0-001-018  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,511                  09/07/17   09/14/17    A to Z Coatings Inc.                
                                                            2revised       -4,500                  01/29/18   02/02/18    A to Z Coatings Inc.                
 
18-1236   Reconstruction               0-001-019  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  03/11/20   06/30/20    MT. OLYMPOS RESTORATION, INC.       
                                                            1             -13,607                  07/03/20   08/12/20    STALCO CONSTRUCTION, INC.           
 
00-1051SC Visual Structural Inspection 0-001-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Medford Elementary School:
94-0888   Reconstruction               0-002-003  02/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1355   Additions and Alterations    0-002-005  12/05/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,978                  10/14/03   10/22/03    McDowell Elec.                      
                                                            1              61,403                  10/14/03   10/22/03    Hirsch & Co.                        
                                                            1              14,002                  02/14/04   07/02/08    Reel Mech.                          
                                                            1              30,450                  02/14/04   04/07/04    Lipsky Enterprises                  
                                                            1               1,000                  07/31/06   08/10/06    Telecom Construction                
                                                            1             -10,000                  09/01/06   10/13/06    Hygrade Insulators                  
                                                            10              9,872                  05/06/05   07/20/05    Lipsky Enterprises                  
                                                            11                491                  10/18/05   11/08/05    Lipsky Enterprises Inc              
                                                            12             10,664                  07/31/06   08/10/06    Lipsky enterprises                  
                                                            13             55,600                  12/21/06   01/30/07    Lipsky Enterprises                  
                                                            2              28,166                  03/05/04   04/07/04    Lipsky Enterprises                  
                                                            2              12,584                  07/26/04   09/23/04    Reel Mech.                          
                                                            2               9,392                  12/08/04   12/23/04    McDowell Elec.                      
                                                            2              19,806                  12/21/04   12/30/04    Hirsh Co                            
                                                            2                 850                  10/13/06   12/18/06    Telecom Construction                
                                                            3              46,733                  04/12/04   04/16/04    Lipsky Enterprises                  
                                                            3              17,797                  07/26/04   09/09/04    Reel Mech.                          
                                                            3              19,314                  12/21/04   12/30/04    Hirsch Co                           
                                                            3              -5,633                  06/03/05   07/21/05    McDowell Electric Corp              
                                                            4              26,410                  04/12/04   04/16/04    Lipsky Enterprises                  
                                                            4               1,649                  10/04/04   10/18/04    Reel Mech.                          
                                                            4              19,350                  12/21/04   12/30/04    Hirsch Co                           
                                                            4               7,964                  05/02/06   10/19/06    McDowell Electric Corp              
                                                            5              19,979                  12/21/04   12/30/04    Lipsky Enterprises                  
                                                            5              13,193                  02/01/05   03/18/05    Hirsch Co                           
                                                            5               1,979                  06/03/05   07/21/05    Reel Mechanical Contractors         
                                                            6              18,221                  02/01/05   03/18/05    Lipsky Enterprises                  
                                                            6               9,095                  09/15/05   09/29/05    Reel mechanical                     
                                                            6                -300                  09/18/06   10/19/06    Hirsch Co                           
                                                            7              19,894                  02/28/05   03/02/05    Lipsky Enterprises Inc              
                                                            7             -50,000                  01/03/06   01/10/06    Reel mechanical Contractors         
                                                            8              19,985                  02/01/05   03/18/05    Lipsky Enterprises                  
                                                            8              15,745                  05/02/06   10/19/06    Reel Mechanical Contractors         
                                                            9              19,985                  02/28/05   03/02/05    Lipski Enterprises                  
                                                            9              -1,719                  06/23/08   10/07/08    REEL MECHANICAL                     
 
99-1645   Reconstruction               0-002-006  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1244   Reconstruction               0-002-007  08/12/02  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0196   Reconstruction               0-002-008  10/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,010                  04/08/16   05/10/16    HVAC Inc.                           
 
05-0933   Reconstruction               0-002-010  08/11/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,846                  08/09/07   08/20/07    STALCO CONSTRUCTION CORP.           
                                                            1               3,612                  06/02/08   03/06/09    Palace Electrical Contracting inc.  
                                                            2               1,790                  01/23/08   04/04/08    STALCO CONSTRUCTION                 
 
12-0373   Reconstruction               0-002-011  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0860   Reconstruction               0-002-012  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -25,000                  05/07/18   05/11/18    SJ Hoerning Construction            
 
16-0861   Reconstruction               0-002-013  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -16,684                  10/24/17   11/08/17    A to Z Coatings Inc.                
 
18-1237   Reconstruction               0-002-014  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -25,000                  02/18/20   06/09/20    THE LANDTEK GROUP, INC.             
                                                            1                -250                  03/11/20   06/30/20    MT. OLYMPOS RESTORATION, INC.       
 
00-1053SC Visual Structural Inspection 0-002-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          River Avenue Elem. School:
94-0889   Reconstruction               0-003-003  02/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0197   Reconstruction               0-003-004  10/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,901                  07/06/16   08/04/16    Total Construction Corp.            
 
02-0076   Additions and Alterations    0-003-005  03/20/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              17,893                  12/21/04   12/30/04    Advanced Conservation               
                                                            1               6,380                  12/21/04   12/30/04    Health Educational Equipment        
                                                            1              19,980                  03/01/05   03/24/05    Long Island Mechanical of NY        
                                                            1              16,956                  06/03/05   07/21/05    HMJ Electric Corp                   
                                                            1              37,674                  04/18/06   06/26/06    Wj Northbridge Construction         
                                                            1             -10,000                  09/01/06   10/12/06    Hygrade Insulators                  
                                                            1             -15,000                  01/03/08   01/23/08    PELLA CONSTRUCTION CORPORATION      
                                                            1R              3,131                  09/14/05   09/29/05    Pathway Systems Design              
                                                            2              11,192                  12/21/04   12/30/04    Advanced Conservation Systems       
                                                            2              19,044                  03/01/05   03/24/05    Long Island Mechanical              
                                                            2              14,086                  07/25/05   08/16/05    HMJ electric corp                   
                                                            2               9,884                  04/18/06   09/06/06    Wj Northbridge Construction         
                                                            2               5,325                  05/02/06   02/21/07    health Educational Equipement       
                                                            3              15,728                  12/21/04   12/30/04    Advanced Conservation               
                                                            3              12,890                  01/03/06   06/26/06    Long Island Mechanical              
                                                            3              24,442                  12/22/06     /  /      HMJ eLECTRIC                        
                                                            3              28,319                  05/07/07   05/16/07    WJ Northridge Construction          
                                                            4              -1,585                  09/14/05   09/29/05    Advanced conservation               
                                                            4              24,241                  08/09/07   08/13/07    W. J. NORTHRIDGE CONSTRUCTION       
                                                            4             -26,499                  06/29/09   08/14/09    LONG ISLAND MECHANICAL OF NY INC    
                                                            5               1,448                  08/09/07   08/13/07    W. J. NORTHRIDGE CONSTRUCTION       
                                                            6             -13,812                  08/09/07   08/13/07    W. J. NORTHRIDGE CONSTRUCTION       
                                                            7               8,902                  06/02/08   08/27/08    W.J Northridge Construction         
                                                            8               9,548                  02/24/09   07/07/09    W.J. NORTHRIDGE CONSTRUCTION CORP.  
 
01-0986   Reconstruction               0-003-006  05/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -20,000                  01/30/03   02/03/03    JP Hunter Enterprises               
 
01-1426   Reconstruction               0-003-007  10/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  05/08/09   05/08/09    Pella General Construction Corp.    
 
12-0374   Reconstruction               0-003-009  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0938   Reconstruction               0-003-010  02/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  01/11/19   03/11/19    D'ONOFRIO GENERAL CONTRACTORS CORP. 
 
18-1238   Reconstruction               0-003-011  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,740                  03/11/20   06/30/20    MT. PLYMPOS RESTORATION, INC.       
                                                            1             -15,000                  09/09/21   11/30/22    Stalco Construction, Inc            
 
00-1054SC Visual Structural Inspection 0-003-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          South Ocean Middle School:
96-1378   Reconstruction               0-004-005  05/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1642   Reconstruction               0-004-007  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1378   Reconstruction               0-004-008  04/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -50,000                  02/11/02   03/21/02    Yellowstone Industries              
 
01-1245   Reconstruction               0-004-009  08/12/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0897   Reconstruction               0-004-010  06/22/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,894                  02/23/07   03/14/07    NRI Construction                    
                                                            1              13,956                  03/29/07     /  /      Cooper Power Lighting               
                                                            1               8,850                  10/22/07   11/09/07    Sanco Mechanical                    
                                                            1              -4,629                  01/03/08   01/14/08    MAJESTIC PLUMBING & CONSULTANTS CORP
                                                            2              10,766                  03/29/07     /  /      Cooper Power Lighting               
                                                            2              -2,030                  10/06/08   05/14/09    NRI CONSTRUCTION INC.               
                                                            3               5,383                  06/06/07   10/23/07    Cooper Power Lighting               
                                                            4              11,900                  06/06/07     /  /      Cooper Power Lighting               
                                                            5              12,054                  02/24/09   06/11/09    COOPER POWER & LIGHTING             
 
13-0198   Reconstruction               0-004-011  10/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,290                  04/08/16   05/10/16    HVAC Inc.                           
                                                            1             -16,770                  07/06/16   08/04/16    Total Construction Corp.            
                                                            2                -600                  07/06/16   08/04/16    HVAC Inc.                           
 
01-1427   Reconstruction               0-004-012  10/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,992                  03/05/04   03/15/04    Jaidan Industries                   
                                                            1             -19,000                  06/17/04   06/25/04    Pella General Construction          
 
03-0396   Additions and Alterations    0-004-013  09/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,947                  04/13/05   04/26/05    LLL Industries                      
                                                            1              12,852                  09/23/05   10/04/05    CNA Enterprises Inc                 
                                                            1               2,477                  01/30/06   07/05/06    Hirsch Co                           
                                                            1             -12,604                  01/21/09   07/07/09    RELLE ELECTRIC CORP.                
                                                            10            -24,356                  02/16/09   04/27/09    CNA ENTERPRISES, INC.               
                                                            2              -5,560                  01/03/06   06/26/06    CNA Enterprises                     
                                                            2              -9,327                  01/03/08   04/03/08    HIRSCH & COMPANYLLC                 
                                                            3              11,158                  05/30/06   07/14/06    CNA Enterprises                     
                                                            4              13,174                  05/30/06   07/14/06    CNA Enterprises                     
                                                            5               1,076                  07/31/06   08/10/06    CNA ENTERPRISES                     
                                                            6               4,000                  12/04/06   01/09/07    CNA Enterprises                     
                                                            7             -19,659                  05/07/07   05/16/07    CNA Enterprises                     
                                                            8                -676                  05/07/07   05/16/07    CNS Enterprises                     
                                                            9             -13,764                  03/18/08   03/31/08    C N A ENTERPRISES, INC.             
 
05-0946   Reconstruction               0-004-014  04/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,999                  03/05/07   02/22/07    Rockmore Contracting                
                                                            1               1,100                  06/06/07   06/20/07    HI Lume Corp                        
                                                            1              -2,000                  01/03/08   01/14/08    ELDOR CONTRACTING CORPORATION       
 
08-0492   Reconstruction               0-004-015  03/04/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  12/20/10   12/31/10    ARCHITECTURAL WINDOWS CORP          
 
08-0086   Reconstruction               0-004-016  08/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -5,000                  10/11/11   08/06/12    ROLAND'S ELECTRIC INC               
 
12-0375   Reconstruction               0-004-017  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0939   Reconstruction               0-004-018  02/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -12,500                  01/11/19   03/12/19    D'ONOFRIO GENERAL CONTRACTORS CORP. 
 
21-0611   Reconstruction               0-004-019  01/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1058SC Visual Structural Inspection 0-004-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Saxton Middle School:
00-0240   Reconstruction               0-005-007  11/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1643   Reconstruction               0-005-008  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0839   Reconstruction               0-005-009  04/05/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,004                  12/04/06   01/09/07    Luvin Construction                  
                                                            1               1,602                  03/29/07   08/15/07    Ambrosio and Company                
                                                            1               4,745                  02/25/08   08/05/08    L.E.B electric                      
                                                            2               4,299                  07/09/07   10/18/07    srbrosio and Co                     
                                                            2             -17,096                  06/29/09   08/14/09    LUVIN CONSTRUCTION CORP             
 
00-1377   Reconstruction               0-005-010  04/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,748                  06/06/02   06/07/02    Larry Tyree Co.                     
                                                            9              20,242                  06/25/04   07/06/04    NY Contracting                      
 
01-1246   Reconstruction               0-005-011  08/12/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1169   Reconstruction               0-005-012  06/14/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,170                  03/29/07   05/16/07    Ferrandino and Sons                 
 
01-1428   Reconstruction               0-005-013  10/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0045   Reconstruction               0-005-014  07/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0849   Reconstruction               0-005-015  07/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,000                  12/04/06   01/09/07    NRI Construction                    
                                                            1              15,875                  03/29/07   10/21/08    Cooper Power Lighting               
                                                            1                -960                  01/03/08   04/09/08    MAJESTIC PLUMBING & CONSULT.        
                                                            1              11,492                  05/04/09   07/31/09    SANCO MECHANICAL INC                
                                                            2             -20,041                  01/08/07   04/03/07    NRI Construction                    
                                                            2              12,421                  03/29/07   08/15/07    Cooper Power Lighting               
                                                            2             -20,000                  01/21/09   07/07/09    SANCO MECHANCIAL INC.               
                                                            3               5,564                  06/06/07   06/20/07    NRI Construction                    
                                                            3             -10,000                  09/22/09   10/09/09    COOPER POWER & LIGHTING             
                                                            4               3,393                  09/10/08   01/28/09    NRI CONSTRUCTION, INC.              
                                                            5               3,272                  09/10/08   01/28/09    NRI CONSTRUCTION, INC.              
 
10-1250   Reconstruction               0-005-016  08/03/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  04/20/12   08/24/12    S.J. HOERNING CONSTRUCTION INC      
                                                            1                -952                  05/18/12   10/09/12    JANSON INDUSTRIES                   
 
08-0493   Reconstruction               0-005-017  03/04/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1             -10,000                  12/20/10   12/31/10    ARCHITECTURAL WINDOWS CORP          
                                                            2               8,892                  06/10/11   07/15/11    ARCHITECTURAL WINDOWS CORP          
 
09-0313   Reconstruction               0-005-018  11/24/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  10/11/11   12/22/11    FLEET MECHANICAL SYSTEMS INC        
                                                            1               1,780                  10/11/11   12/22/11    PALACE ELECTRICAL CONTRACTORS INC   
 
12-0376   Reconstruction               0-005-019  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0199   Reconstruction               0-005-020  10/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,200                  04/08/16   05/10/16    HVAC Inc.                           
 
16-0862   Reconstruction               0-005-021  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -25,051                  10/24/17   11/08/17    A to Z Coatings Inc.                
 
17-0940   Reconstruction               0-005-022  02/08/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1239   Reconstruction               0-005-023  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              46,059                  12/23/19   01/28/20    LASER INDUSTRIES, INC.              
                                                            2                -629                  02/18/20   06/09/20    LANSER INDUSTRIES, INC.             
 
00-1057SC Visual Structural Inspection 0-005-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Barton Ave. Elementary:
02-0077   Additions and Alterations    0-008-005  05/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,553                  06/17/04   06/25/04    Nasuf Const.                        
                                                            1              15,936                  09/03/04   10/12/04    Majestic Plumbing                   
                                                            1               7,744                  02/01/05   06/29/05    Versa Tel Inc                       
                                                            1               7,810                  03/02/05   01/03/06    Long Island Mechanical of NY        
                                                            1              10,118                  07/16/05   07/25/05    HMJ Electric,corp.                  
                                                            1             -10,000                  09/01/06   10/12/06    Hygrade Insulators                  
                                                            2              13,789                  09/03/04   12/09/04    Nasuf Const.                        
                                                            2              13,834                  09/22/04   10/12/04    Majestic Plumbing                   
                                                            2              18,045                  07/25/05   08/03/05    HMJ Electric corp                   
                                                            2              -4,000                  09/15/05   09/29/05    Versa Tel Inc                       
                                                            2               4,814                  01/30/06     /  /      Long Island Mechanical              
                                                            3              14,956                  09/20/04   09/29/04    Nasuf Const.                        
                                                            3              13,137                  12/08/04   06/23/05    Majestic Plumbign Consulting        
                                                            3              10,946                  07/25/05   08/03/05    HMJ Electric Corp                   
                                                            4               7,708                  05/06/05   06/10/05    Nasuf Construction Corp             
                                                            4              10,378                  05/06/05   06/10/05    Majestic Plumbing Consulting        
                                                            4              27,309                  12/22/06     /  /      HMJ Electric                        
                                                            5              13,000                  05/06/05     /  /      Majestic Plumbing Consulting        
                                                            6               7,781                  06/03/05   06/30/05    Majestic Plumbing Consulting        
 
00-1261   Reconstruction               0-008-006  04/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -29,750                  02/11/02   03/25/02    JP Hunter                           
 
01-1170   Reconstruction               0-008-007  06/14/02  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0200   Reconstruction               0-008-008  10/21/14  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0377   Reconstruction               0-008-010  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0863   Reconstruction               0-008-011  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,439                  10/24/17   11/08/17    A to Z Coatings Inc.                
 
18-1240   Reconstruction               0-008-012  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  03/11/20   06/30/20    MT. OLYMPOS RESTORATION, INC.       
                                                            1              -7,500                  09/09/21   11/30/22    Stalco Construction, Inc            
 
00-1050SC Visual Structural Inspection 0-008-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Oregon Avenue Junior High:
02-1701   Additions and Alterations    0-009-005  06/13/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,700                  06/05/06   06/30/06    Lipsky Enterprises                  
                                                            1              39,436                  04/27/07     /  /      Eldor Contracting                   
                                                            1               2,150                  06/02/08   09/29/08    Thermo Tech. Combustion,Inc         
                                                            2               4,217                  06/02/08   08/08/08    Lipsky Enterprises Inc.             
                                                            2               8,136                  02/04/09   06/10/09    ELDOR CONTRACTING CORP.             
                                                            3             -25,000                  08/18/08   09/29/08    Lipsky Enterprises,Inc              
                                                            3              13,051                  02/24/09   06/10/09    ELDOR CONTRACTING CORP.             
                                                            4               6,592                  02/24/09   06/10/09    ELDOR CONTRACTING, CORP.            
                                                            5              10,940                  02/24/09   06/10/09    ELDOR CONTRACTING CORP.             
                                                            6              18,247                  02/24/09     /  /      ELDOR CONTRACTING CORP.             
                                                            7               3,284                  02/24/09   06/10/09    ELDOR CONTRACTING CORP.             
                                                            8               5,480                  06/29/09   08/14/09    ELDOR CONTRACTING CORP              
 
99-1644   Reconstruction               0-009-006  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1247   Reconstruction               0-009-007  08/12/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1178   Reconstruction               0-009-008  11/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,540                  07/06/04   07/27/04    Bain Heating                        
 
13-0201   Reconstruction               0-009-009  10/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,800                  02/29/16   03/07/16    Hygrade Insulators Inc.             
 
01-1171   Reconstruction               0-009-010  06/14/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -201                  01/07/05   01/25/05    ANS Environmental                   
 
12-0378   Reconstruction               0-009-011  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1899   Reconstruction               0-009-012  06/23/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  12/23/16   01/05/17    Hygrade Insulators, Inc.            
 
18-1241   Reconstruction               0-009-013  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              66,291                  12/23/19   06/23/20    LASER INDUSTRIES, INC.              
                                                            1              -7,500                  09/09/21   11/30/22    Stalco Construction, Inc            
                                                            2                -719                  02/18/20   06/09/20    LANSER INDUSTRIES, INC.             
 
19-1120   Reconstruction               0-009-014  02/26/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1            -100,000                  11/19/21   12/09/22    Arrow Steel Window Corp             
 
00-1056SC Visual Structural Inspection 0-009-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tremont Ave School:
13-0202   Reconstruction               0-010-005  10/21/14  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1783   Additions and Alterations    0-010-006  05/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -73,350                  04/11/02   04/26/02    Walsh Mech.                         
 
00-1263   Reconstruction               0-010-007  04/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -50,860                  02/11/02   03/25/02    JP Hunter                           
 
02-1068   Reconstruction               0-010-008  11/04/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              15,270                  09/03/04   09/23/04    Capobianco Inc                      
                                                            1               6,836                  04/13/05   04/26/05    LEB Electric                        
                                                            1               9,460                  07/11/05   07/22/05    hirsch Co                           
                                                            1              -8,752                  09/15/05   09/29/05    gordon Seaman                       
                                                            1              -8,573                  05/03/06   05/24/06    Jns Heating Service                 
                                                            1              -8,359                  01/30/06   07/24/06    Hygrade Insulators                  
                                                            2               8,628                  11/01/04   12/06/04    Capobianco Inc                      
                                                            2               7,362                  01/03/08   01/26/08    JNS HEATING SERVICE, INCORPORATED   
                                                            2               2,340                  05/06/05   07/21/05    LEB Electric                        
                                                            3              19,379                  09/15/05   09/29/05    Capobianco Inc                      
                                                            3             -11,635                  09/01/06   12/27/06    LEB Electric                        
                                                            4               9,566                  09/15/05   09/29/05    Capobianco Inc                      
                                                            5             -15,928                  02/25/08   04/02/08    capobianco                          
 
05-0934   Reconstruction               0-010-010  08/11/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,279                  01/23/08   08/07/08    PALACE ELECTRICAL CONTRACTORS       
                                                            1               3,021                  01/23/08   08/07/08    KEM CONSTRUCTION                    
                                                            1               4,080                  06/02/08   08/27/08    Stalco construction inc             
                                                            2               1,121                  06/02/08   03/06/09    Palace Electrical Contracting inc.  
 
12-0379   Reconstruction               0-010-011  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0864   Reconstruction               0-010-012  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -17,027                  10/24/17   11/08/17    A to Z Coatings Inc.                
 
18-1242   Reconstruction               0-010-013  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  03/11/20   06/30/20    MT. OLYMPOS RESTORATION, INC.       
                                                            1              -7,500                  09/09/21   11/30/22    Stalco Construction, Inc            
 
00-1055SC Visual Structural Inspection 0-010-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Eagle Drive Elementary:
90-0815   Reconstruction               0-011-003  02/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0204   Reconstruction               0-011-005  10/21/14  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0535   Additions and Alterations    0-011-006  04/01/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,800                  01/03/06   06/30/06    Majestic Plumbing Consulting        
                                                            1               5,426                  11/20/06   01/09/07    Lipsky Enterprises                  
                                                            1              18,762                  01/08/07   02/02/11    Corporate Electrical                
                                                            1              12,725                  11/29/06   04/23/07    Long Island Mechanical              
                                                            2               5,154                  12/04/06   03/09/07    Majestic Plumbing                   
                                                            2             -14,517                  01/03/08   04/09/08    LO MECHANICAL OF NEW YORK, INCORPORA
                                                            2             -27,565                  02/19/08   03/06/08    Lipsky Enterpries                   
                                                            2               1,936                  02/25/08   08/05/08    Corporate Electrical Technologies   
                                                            3              -1,351                  02/19/08   08/26/08    Majestic Plumbing & Conslting       
                                                            3               2,242                  06/02/08   03/06/09    Corporate Electrical Technologies   
 
03-0535SR Additions and Alterations    0-011-006  10/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1262   Reconstruction               0-011-007  04/06/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1179   Reconstruction               0-011-008  11/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              20,825                  07/06/04   07/27/04    Bain Heating                        
                                                            2               7,990                  07/06/04   07/27/04    Bain Heating                        
                                                            2               2,738                  07/06/04   07/27/04    Bain Heating                        
                                                            3             -58,000                  05/06/05   07/20/05    Bain Heating Piping                 
 
05-0935   Reconstruction               0-011-010  08/11/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,750                  06/06/07   06/20/07    Stalco Construction                 
                                                            1                 518                  01/23/08   08/05/08    PALACE ELECTRICAL CONSTRUCTION      
                                                            1              -4,750                  03/18/08   01/27/09    WALSH MECHANICAL CONTRACTORS        
                                                            2                 676                  06/02/08   03/06/09    Palace Electrical Contracting inc.  
 
08-0606   Reconstruction               0-011-011  03/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0380   Reconstruction               0-011-012  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0865   Reconstruction               0-011-013  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -16,978                  10/24/17   11/08/17    A to Z Coatings Inc.                
 
18-1243   Reconstruction               0-011-014  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  03/11/20   06/30/20    MT. OLYMPOS RESTORATION, INC.       
                                                            1              -2,840                  07/03/20   08/12/20    STALCO CONSTRUCTION, INC.           
 
00-1060SC Visual Structural Inspection 0-011-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Canaan Elementary School:
00-1260   Reconstruction               0-013-003  04/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -15,000                  02/11/02   03/25/02    JP Hunter Ent.                      
 
02-2382   Additions and Alterations    0-013-005  05/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,725                  05/02/06   08/09/06    Majestic Plumbing Consulting        
                                                            1               3,116                  05/02/06   08/09/06    Palace Electrical Contractors       
                                                            1               3,116                  05/02/06     /  /      Palace Electrical Contractors       
                                                            1              84,998                  04/27/07   05/08/07    Capobianco Inc                      
                                                            1             -12,495                  01/03/08   01/24/08    JNS HEATING SERVICE INCORPORATED    
                                                            2               6,084                  12/22/06     /  /      Palace Electrical                   
                                                            2              15,738                  05/08/07   05/08/07    Capobianco Inc                      
                                                            2               3,358                    /  /       /  /      Majestic Plumbing                   
                                                            3             -42,936                  09/19/07   11/08/07    CAPOBIANCO, INC.                    
                                                            3               6,536                  06/23/08     /  /      Palace Electrical                   
                                                            4               2,932                  06/02/08   08/07/08    Palace Electircal Contracting       
 
01-1180   Reconstruction               0-013-006  11/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,345                  07/06/04   07/27/04    Bain Heating                        
 
13-0205   Reconstruction               0-013-007  10/21/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,500                  04/08/16   05/10/16    HVAC Inc.                           
 
01-1172   Reconstruction               0-013-008  06/14/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1431   Reconstruction               0-013-009  10/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,500                  03/05/04   03/15/04    Jaidan Industries                   
                                                            1              -5,000                  04/12/04   04/20/04    Paza Contracting                    
 
05-0936   Reconstruction               0-013-010  08/11/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,904                  06/06/07   06/20/07    Stalco Construction                 
                                                            1               1,949                  06/02/08   03/06/09    Palace Electrical Contracting Inc   
                                                            2               1,873                  01/23/08   04/04/08    STALCO CONSTRUCTION                 
 
12-0381   Reconstruction               0-013-011  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0866   Reconstruction               0-013-012  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,876                  09/07/17   09/14/17    A to Z Coatings Inc.                
                                                            2             -10,000                  10/24/17   11/08/17    A to Z Coatings Inc.                
 
18-1244   Reconstruction               0-013-013  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              36,000                  03/11/20   06/30/20    MT. OLYMPOS RESTORATION, INC.       
                                                            1              -7,500                  09/09/21   11/30/22    Stalco Construction, Inc            
 
18-1245   Additions and Alterations    0-013-014  03/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -30,000                  09/09/21   11/30/22    Stalco Construction, Inc            
 
00-1052SC Visual Structural Inspection 0-013-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Patchogue-Medford High School:
90-1403   Reconstruction               0-015-003  05/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0890   Reconstruction               0-015-004  02/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0279   Reconstruction               0-015-005  10/23/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1552   Reconstruction               0-015-007  05/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0087   Reconstruction               0-015-008  10/19/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0332   Reconstruction               0-015-009  03/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0551   Additions and Alterations    0-015-010  06/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              15,676                  05/22/03   06/02/03    Gordon L.Seaman                     
                                                            1              66,857                  10/14/03   03/23/07    Pav-Lak Industries                  
                                                            1              19,413                  12/16/03   01/08/04    Preferred Plumbing                  
                                                            1              12,500                  03/05/04   03/15/04    JP Hunter Enterprises               
                                                            1               1,529                  01/30/06   05/23/06    JNS HEATING SERVICE, INC.           
                                                            2             -43,087                  09/11/03   09/16/03    Gordon L Seaman                     
                                                            2              11,986                  03/05/04   06/10/04    Preferred Plumbing                  
                                                            2              21,007                  04/29/04   05/07/04    Pav Lak Industries                  
                                                            2              16,848                  07/25/05   08/03/05    JP Hunter Enteprises                
                                                            3              17,015                  12/16/03   01/08/04    Gordon L Seaman                     
                                                            3               2,876                  06/25/04   07/12/04    Preferred Plumbing                  
                                                            3              19,393                  12/08/04   12/24/04    Pav-Lak Industries                  
                                                            30/28/05       35,517                  10/11/05   10/28/05    JP Hunter Enterprises               
                                                            4              13,795                  06/25/04   07/06/04    Gordon L Seaman                     
                                                            4              19,438                  12/08/04   12/24/04    Pav-Lak Indsutres                   
                                                            4              25,054                  02/07/05   03/23/07    Preferred Plumbing Heating          
                                                            5              18,737                  12/08/04   12/24/04    Pav-Lak Industries                  
                                                            5              15,048                  01/24/05   03/23/07    Gordon Seaman inc                   
                                                            5               9,721                  02/28/05   03/02/05    Preferred Plumbing heating Inc      
                                                            6              16,369                  12/08/04   12/24/04    Pav-Lak Industries                  
                                                            6               9,870                  01/24/05   06/30/05    Gordon Seaman inc                   
                                                            7               9,988                  10/11/05   10/17/05    Pav-Lak Industries                  
                                                            8              13,781                  10/11/05   10/17/05    Pav-Lak Industries                  
                                                            8               5,769                  04/30/07   05/16/07    Gordon Seaman                       
                                                            9             -12,082                  06/06/07   07/17/07    Gordon Seaman                       
 
00-1200   Reconstruction               0-015-011  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              16,850                  02/13/02   04/05/02    Pioneer Const.                      
                                                            2              11,500                  04/11/02   05/24/02    Guy Pratt                           
                                                            3              78,325                  04/11/02   05/24/02    Guy Pratt                           
                                                            4               9,680                  06/06/02   08/15/02    Guy Pratt                           
                                                            5              36,136                  07/09/02   10/30/02    Guy Pratt                           
                                                            6              14,712                  10/26/04   12/23/04    Guy Pratt                           
                                                            7             -41,416                  10/26/04   12/23/04    Guy Pratt                           
 
00-1573   Reconstruction               0-015-012  04/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,707                  07/09/02   07/10/02    Thermo-Tech Combustion              
 
01-0957   Reconstruction               0-015-013  05/23/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -80,500                  11/21/03   11/24/03    JP Hunter Enterprises               
                                                            CO-EC-01       15,300                  09/25/05   02/21/07    All Bright Electric                 
 
02-2381   Reconstruction               0-015-014  02/27/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,923                  12/08/04   12/24/04    Hi-Lume Corp                        
                                                            1              33,957                  02/07/05   07/26/05    LEB Electric                        
                                                            2              16,398                  01/03/06   06/30/06    LEb Electric                        
                                                            3              23,633                  01/03/06   06/30/06    LEb electric                        
 
03-0901   Reconstruction               0-015-015  03/12/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,500                  06/05/06   07/26/06    Architectural Window                
 
05-0463   Reconstruction               0-015-016  06/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,406                  05/07/07   08/01/07    Eldor Contracting                   
                                                            1              19,818                  05/07/07   08/01/07    JNS  Heating Service                
 
12-0382   Reconstruction               0-015-018  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0203   Reconstruction               0-015-019  10/21/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0941   Reconstruction               0-015-020  02/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -30,000                  01/11/19   03/12/19    D'ONOFRIO GENERAL CONTRACTORS CORP. 
                                                            1             -15,150                  11/18/19   01/17/20    METRO PAVING, LLC                   
 
18-1246   Reconstruction               0-015-021  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  09/09/21   11/30/22    Stalco Construction, Inc            
 
18-1247   Reconstruction               0-015-022  03/11/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1364   Reconstruction               0-015-023  05/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1365   Reconstruction               0-015-024  05/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1766   Reconstruction               0-015-025  07/29/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0064   Reconstruction               0-015-026  11/30/22  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1059SC Visual Structural Inspection 0-015-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Structure/High School:
00-0836   New Construction             0-024-001  02/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,230                  04/11/02   05/24/02    HMJ Elec.                           
                                                            1              11,401                  06/06/02   08/15/02    Lipsky Ent.                         
                                                            1               5,800                  07/09/02   10/30/02    Chevally & Wallace                  
                                                            2             -10,000                  06/24/03   07/11/03    Lipsky Ent.                         
 

          HIgh School:
18-1248   New Construction             0-039-001  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -30,000                  09/09/21   11/30/22    Stalco Construction, Inc            
 

          Administration Bldg.:
12-0383   Reconstruction               1-006-002  12/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Public Library:
93-0501   Reconstruction               6-021-001  02/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0064   Reconstruction               6-021-003  08/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0680   Reconstruction               6-021-004  01/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0056   Reconstruction               6-021-006  10/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0330   Reconstruction               6-021-007  11/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-0001         4,525                  06/05/07   10/23/07    South Shore Electric                
                                                            EC-0002         1,350                  06/05/07   10/23/07    South Shore Electric                
                                                            EC-0003         5,200                  07/24/07   10/24/07    South Shore Electric                
                                                            GC-0001           677                  06/05/07   10/23/07    South Shore Electric                
                                                            GC-0002        18,475                  06/05/07   06/18/07    South Shore ELectric                
                                                            GC-0003         7,140                  07/24/07   08/07/07    South Shore Electric                
                                                            GC-0004        -5,000                  11/09/07   01/28/08    South Shore Electric                
                                                            PC-0001         1,414                  06/05/07   10/23/07    Majestic Plumbing heating           
                                                            PC-0002         1,627                  06/05/07   10/23/07    Majestic Plumbing Consulting        
 
07-0089   Reconstruction               6-021-008  08/01/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1463   Reconstruction               6-021-009  04/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1207   Reconstruction               6-021-010  08/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0012   Reconstruction               6-021-011  07/11/11  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1428   Reconstruction               6-021-012  05/14/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXSt. Paul Episcopal Church (leased):
10-0179   Reconstruction               6-032-001  08/30/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Carnegie Library:
13-1305   Reconstruction               6-033-001  08/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Medford Branch Library:
21-0012   New Construction             6-040-001  08/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0464   Reconstruction               6-040-002  09/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
91-1080   Reconstruction               7-999-002  05/18/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1590   Reconstruction               7-999-004  06/05/97  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2127   Reconstruction               7-999-007  07/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              6,175                  05/18/12   09/26/12    PREFERRED ELECTRIC INC              
                                                            2              -2,385                  01/29/19   02/27/19    PREFERRED ELECTRIC, INC.            
 
10-0916   Reconstruction               7-999-008  05/24/11  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0913   Reconstruction               7-999-009  07/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE

WILLIAM FLOYD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-32-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          MorichesElemAnnexLittleRedSHsLsdColo:
20-0351   Reconstruction               0-001-005  12/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXWm. Floyd Kindergarten Bldg:
92-0108   Reconstruction               0-002-003  08/05/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nathaniel Woodhull Elementary:
91-0015   Reconstruction               0-003-005  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1332   Additions and Alterations    0-003-006  06/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0920   Reconstruction               0-003-008  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0465   Additions and Alterations    0-003-009  04/11/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-11            2,798                  11/19/03   01/08/04    Weisbach Elec.                      
                                                            E-2             5,100                  05/22/02   05/29/02    Weisbach Elec.                      
                                                            E-3            22,599                  01/31/02   03/29/02    Weisbach Elec.                      
                                                            E-5            24,386                  05/19/03   05/23/03    Weisbach Elec.                      
                                                            E-6            10,235                  08/01/03   08/15/03    Weisbach Elec.                      
                                                            E-9             2,322                  11/19/03   01/08/04    Weisbach Elec.                      
                                                            EQ-03         -10,000                  05/06/04   05/14/04    H&E Equipment                       
                                                            EQ-2            2,440                  09/25/03   10/22/03    H&E Equipment                       
                                                            G-2            39,110                  08/01/03   08/15/03    George Campbell Assoc.              
                                                            G-3             8,425                  06/01/04   06/09/04    George Campbell Assoc.              
                                                            GC-05           1,394                  06/01/04   06/09/04    George Campbell Assoc.              
                                                            GC-08        -130,000                  05/21/07   06/21/07    george Campbell Associates          
                                                            GC-10         -10,000                  05/21/07   06/21/07    George Campbell Associates          
                                                            GC-12         -12,000                  05/21/07   06/21/07    George Campbell                     
                                                            GC-14          85,000                  05/21/07   06/21/07    George Campbel Associates           
                                                            GC-16         -50,000                  05/21/07   06/21/07    George Campbell Associates          
                                                            GC-18         -54,000                  05/21/07   06/22/07    George Campell                      
                                                            GC-20          61,141                  05/21/07   06/22/07    George Campbell Associates          
                                                            H-2            20,210                  02/18/03   04/03/03    JNS Heating                         
                                                            HC-06         -60,000                  11/09/04   12/06/04    JNS Heating                         
                                                            P-2             4,213                  01/31/02   03/29/02    ARA Plumbing                        
                                                            P-3            17,439                  02/18/03   04/03/03    ARA Plumbing                        
                                                            P-4             7,365                  06/24/03   07/11/03    ARA Plumbing                        
                                                            PC-07           2,248                  04/06/04   04/27/04    ARA Plumbing                        
                                                            PC-08         -20,000                  05/01/04   06/09/04    ARA Plumbing                        
                                                            TC-02           2,247                  12/18/03   12/30/03    CBS Whitcom                         
                                                            TC-03         -20,000                  04/06/04   04/28/04    CBS Whitcom                         
 
08-0584   Reconstruction               0-003-010  04/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            9,624                  12/08/09     /  /      A.S.R. ELECTRICAL CONTRACTING INC   
                                                            HC-1           11,116                  02/04/10   04/16/10    JNS HEATING SERVICE INC             
                                                            PC-1           -1,000                  02/04/10   04/16/10    HIRSCH & CO LLC                     
 
17-1624   Reconstruction               0-003-012  05/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-2-01       -52,731                  11/19/19   12/10/19    NIKO K CONSTRUCTION CORP.           
 
18-1347   Reconstruction               0-003-013  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0517   Reconstruction               0-003-014  02/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -1,238                  03/10/21   04/30/21    RELLE ELECTRIC CORP.                
                                                            EC-01         -25,000                  10/11/22   07/11/23    Relle Elec Corp                     
                                                            SC-01         -10,000                  11/19/19   12/18/19    TOTAL CONSTRUCTION CORP.            
 
22-1117   Reconstruction               0-003-015  04/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0875SC Visual Structural Inspection 0-003-SC1  01/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          William Floyd Elementary:
91-0016   Reconstruction               0-004-006  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0109   Reconstruction               0-004-007  08/05/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1407   Reconstruction               0-004-008  06/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1333   Additions and Alterations    0-004-009  06/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0918   Reconstruction               0-004-010  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0015   Additions and Alterations    0-004-011  10/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               1,800                  05/20/05   06/20/05    Ultimate Power Inc                  
                                                            EC-2            7,723                  08/07/03   08/26/03    Palace Elec. Contractors            
                                                            EC-4            2,375                  11/19/03     /  /      Palace Elec. Contractors            
                                                            G-1            32,260                  02/18/03   03/13/03    Fortunato Sons                      
                                                            G-2            84,625                  02/18/03   03/13/03    Fortunato Sons                      
                                                            G-3            12,356                  03/24/03   04/17/03    Fortunato Sons                      
                                                            GC-03          10,737                  09/13/05     /  /      Cromwell and Tish building          
                                                            HC-02          12,472                  04/05/04   06/04/04    JNS Heating                         
                                                            HC-05           3,336                  11/09/04   11/29/04    JNS Heating Service                 
                                                            PC-02          15,801                  02/18/03   03/13/03    Hirsch & Company                    
                                                            PC-02           3,017                  04/01/04   04/08/04    Northeastern Plumbing               
                                                            PC-03           7,215                  04/01/04   04/08/04    Hirsch & Company                    
 
02-0366   Reconstruction               0-004-012  01/09/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-02          10,088                  11/15/04   11/29/04    Angelo Capobianco                   
                                                            RC-04          14,253                  12/08/05   05/23/06    ANGELO CAPOBIANCO, INC.             
 
04-1026   Reconstruction               0-004-013  05/23/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0               3    /  /       /  /                                          
                                                            E-2             3,521                  12/21/05   01/19/06    J.P. DALY & SONS, INC.              
                                                            G-2           -22,502                  12/21/05   05/24/06    Rockmore Contracting                
                                                            L-3            20,919                  12/21/05   05/24/06    Ferran Development                  
                                                            L-4            -1,009                  01/18/06   12/18/06    Ferran Development                  
 
08-0585   Reconstruction               0-004-014  04/08/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1625   Reconstruction               0-004-016  05/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1-01       -24,729                  11/19/19   12/10/19    NIKO K CONSTRUCTION CORP.           
 
18-0293   Reconstruction               0-004-017  10/01/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            WC-01         -35,000                  09/23/20   11/06/20    ARROW STEEL WINDOW CORP.            
 
18-1348   Reconstruction               0-004-018  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2109   Reconstruction               0-004-019  08/20/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          42,665                  02/08/21   03/24/21    LEB ELECTRIC, LTD.                  
                                                            EC-02          30,000                  02/08/21   03/31/21    LEB ELECTRIC, LTD                   
                                                            EC-03            -897                  06/22/22   05/04/23    LEB Elec Ltd                        
                                                            MC-1-02       -30,000                  10/11/22   07/11/23    Ultimate Power Inc                  
                                                            MC-1-03       -83,764                  02/21/23   12/19/23    ULTIMATE POWER INC                  
                                                            MC-1-03       -83,764                  03/23/23     /  /      ULTIMATE POWER,INC                  
                                                            PC-01         -25,964                  01/08/21   03/10/21    AMBROSIO & COMPANY                  
 
20-1763   Reconstruction               0-004-020  07/10/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -15,000                  03/28/22   02/13/23    M&N Const Servs Inc                 
 
22-1118   Reconstruction               0-004-021  04/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0872SC Visual Structural Inspection 0-004-SC1  01/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          William Floyd SH (Frmrly J/S HS):
91-0017   Reconstruction               0-005-007  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0110   Reconstruction               0-005-008  08/05/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1408   Reconstruction               0-005-009  06/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0339   Additions and Alterations    0-005-010  02/08/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-03           75,000                  07/18/02   07/18/02    EW Howell                           
                                                            H-04           50,428                  07/18/02   07/18/02    JNS Heating                         
 
94-1485   Reconstruction               0-005-011  06/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1689   Reconstruction               0-005-012  07/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1550   Reconstruction               0-005-013  05/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1028   Reconstruction               0-005-014  05/01/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1077   Reconstruction               0-005-015  06/04/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1175   Reconstruction               0-005-016  05/04/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0106   Reconstruction               0-005-017  09/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1             4,500                  10/02/01   02/08/02    JS McHugh                           
 
00-1354   Reconstruction               0-005-018  04/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          23,081                  11/10/04   06/21/05    Elemco Electrical Contract          
                                                            EC-03          12,927                  03/25/05   01/03/06    Elemco Electical Contract           
                                                            EC-07             361                  09/19/05   10/04/05    Elemco Electrical Contract          
                                                            GC-01          33,900                  09/25/03   10/02/03    American Tech.                      
                                                            GC-01          18,000                  11/10/04   11/19/04    Cromwell and Tish Building          
                                                            GC-02        -362,900                  04/01/04   04/13/04    American Tech                       
                                                            GC-02          -2,680                  06/21/05   06/29/05    Cronwell and Tish building          
                                                            GC-03            -840                  06/21/04   06/25/04    American Tech                       
                                                            GC-04          -8,567                  04/12/06   06/23/06    Cromwell and tish building          
                                                            PC-01          16,196                  04/01/04   04/23/04    Northeastern Plumbing               
                                                            SC-1            8,332                  11/19/03   11/21/03    DF Stone Contracting                
 
04-1027   Reconstruction               0-005-019  05/23/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3             1,468                  04/11/06   05/26/06    Jp Daly and Sons                    
                                                            H-1             3,182                  12/08/05   05/24/06    JNS HEATING SERVICE, INC.           
                                                            H-3            15,237                  04/11/06   05/26/06    JNs heating Service                 
                                                            H-4              -483                  09/20/06   12/18/06    JNS heating                         
                                                            H4               -484                  06/15/06   11/30/06    JNS heating Service                 
 
08-1622   Additions and Alterations    0-005-020  11/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01          22,685                  09/16/13     /  /      J.P. Daly & Sons, Inc.              
                                                            EC-01           4,771                  03/18/14     /  /      Mainline Electric Corp.             
                                                            EC-02          17,591                  02/19/14   03/21/14    J.P. Daly & Sons, Inc.              
                                                            EC-1              950                  01/23/13   04/09/13    PETER LOMBARDO ELECTRICAL CONSULTING
                                                            EQ1-1         -10,286                  01/23/13   04/09/13    BAR BOY PRODUCTS INC                
                                                            EQ2-1          12,575                  06/21/12   11/14/12    Health & Educational Equipment Corp.
                                                            EQ2-2               0          -5,950  05/02/14     /  /      Health & Edycational Equipment Corp.
                                                            EQ2-2          -5,950                  05/02/14   05/16/14    HEALTH & EDUCATIONAL EQUIP CORP     
                                                            EQ2-3          18,525                  05/02/14   05/16/14    Health & Educational Equipment Corp.
                                                            GC - 02        11,163                  10/17/12   03/19/13    Tromel Construction Corp.           
                                                            GC - 03        28,680                  10/17/12   03/19/13    Tromel Construction Corp.           
                                                            GC - 04         6,775                  10/17/12   03/19/13    Tromel Construction Corp.           
                                                            GC - 05        27,204                  10/17/12   03/19/13    Tromel Construction Corp.           
                                                            GC - 06        16,813                  10/17/12   03/19/13    Tomel Construction Corp.            
                                                            GC - 07        15,036                  10/17/12   03/19/13    Tromel Construction Corp.           
                                                            GC - 08        27,600                  10/17/12   03/19/13    Tromel Construction Corp.           
                                                            GC - 09        17,280                  10/17/12   03/19/13    Tromel Construction Corp.           
                                                            GC-01         -50,800                  02/01/12   04/19/12    TROMEL CONSTRUCTION CORP            
                                                            GC-02          11,163                  12/14/12     /  /      Tromel Construction Corp.           
                                                            GC-03          28,680                  12/14/12     /  /      Tromel Construction Corp.           
                                                            GC-04           6,775                  12/14/12     /  /      Tromel Construction Corp.           
                                                            GC-05          27,204                  12/14/12   03/21/13    Tromel Construction Corp.           
                                                            GC-06          16,813                  12/14/12   07/24/13    Tromel Construction Corp.           
                                                            GC-07          15,036                  12/14/12   03/21/13    Tromel Construction Corp.           
                                                            GC-08          27,600                  12/14/12   03/21/13    Tromel Construction Corp.           
                                                            GC-09          17,280                  12/14/12   03/21/13    Tromel Construction Corp.           
                                                            GC-10          14,572                  01/23/13   05/17/13    TROMEL CONSTRUCTION CORP            
                                                            GC-11           7,011                  01/23/13   05/09/13    TROMEL CONSTRUCTION CORP            
                                                            GC-12           3,211                  01/23/13   05/09/13    TROMEL CONSTRUCTION CORP            
                                                            GC-13           4,764                  01/23/13   05/09/13    TROMEL CONSTRUCTION CORP            
                                                            GC-14           3,856                  02/07/13   05/02/13    TROMEL CONSTRUCTION CORP            
                                                            GC-15           1,922                  02/07/13   05/02/13    TROMEL CONSTRUCTION CORP            
                                                            HC-01           7,832                  03/23/12   08/08/12    SAV-MOR MECHANICAL INC              
                                                            HC-02         -34,626                  04/10/13   07/08/13    SAV-MOR MECHANICAL INC              
                                                            PC-01           8,418                  05/16/12   02/20/14    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-02           3,192                  05/31/12   10/12/12    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-03           9,711                  05/31/12   02/20/14    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-04           3,511                  05/31/12   10/12/12    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-05          10,798                  12/11/12   03/11/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-06          15,374                  12/11/12   03/11/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-07           2,232                  12/11/12   03/11/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-08           7,038                  12/11/12   03/11/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-09          19,195                  12/11/12   02/20/14    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-10           6,637                  12/11/12   03/11/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-11           5,271                  01/23/13   04/09/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-12           9,596                  01/23/13   04/09/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-13           2,507                  01/23/13   04/09/13    ADVANCED CONSERVATION SYSTEMS INC   
 
11-0826   Additions and Alterations    0-005-021  06/12/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            3,959                  03/22/13   06/05/13    HINCK ELECTRICAL CONTRACTOR INC     
                                                            EC-3            9,134                  11/04/13   11/20/13    HINCK ELECTRICAL CONTRACTOR INC     
                                                            EC-4           15,586                  11/04/13   11/20/13    HINCK ELECTRICAL CONTRACTORS INC    
                                                            EC-5            3,760                  12/23/13   01/14/14    Hinck Electrical Contractor, Inc.   
 
11-0914   Reconstruction               0-005-022  06/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           8,771                  01/23/13   04/09/13    TROMEL CONSTRUCTION CORP            
                                                            GC-02           3,794                  03/22/13   06/17/13    TROMEL CONSTRUCTION CORP            
                                                            HC-01          -5,000                  04/10/13   02/21/14    SAV-MOR MECHANICAL INC              
                                                            PC-01           3,351                  12/11/12   12/31/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-02           1,420                  12/11/12   12/31/13    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-03           2,109                  01/23/13   02/14/14    ADVANCED CONSERVATION SYSTEMS INC   
                                                            PC-04           7,000                  01/23/13   02/14/14    ADVANCED CONSERVATION SYSTEMS INC   
 
12-0390   Additions and Alterations    0-005-023  03/19/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          -8,747                  03/18/14     /  /      LEB Electric Ltd.                   
                                                            GC-02          19,492                  12/23/13   01/22/14    J. Anthony Enterprises, Inc.        
                                                            GC-03           8,114                  12/23/13   01/22/14    J. Anthony Enterprises, Inc.        
                                                            HC-01         -10,188                  03/18/14     /  /      Premier Mechanical Services, Inc.   
                                                            PC-01           1,862                  12/23/13   06/12/14    Advanced Conservation Systems, Inc. 
 
16-0389   Reconstruction               0-005-025  05/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,800                  09/20/17   10/13/17    ACL Construction Corp.              
 
17-0122   Reconstruction               0-005-026  02/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,974                  07/19/18   09/12/18    FIDELE CONSTRUCTION INC             
 
18-0516   Reconstruction               0-005-028  03/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          49,929                  02/08/21   03/31/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            EC-02           5,221                  02/08/21   03/31/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            EC-03           5,248                  03/26/21   05/12/21    PALACE ELECTRICAL CONTRACTORS, INC. 
                                                            GC-01          38,345                  02/10/21   03/23/21    W.J. NORTHRIDGE CONSTRUCTION CORP.  
                                                            SC-01          -7,300                  07/26/19   08/13/19    LASER INDUSTRIES, INC.              
                                                            SC-02           7,056                  02/19/20   06/09/20    LASER INDUSTRIES, INC.              
 
18-1349   Reconstruction               0-005-029  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0518   Reconstruction               0-005-030  02/04/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2110   Reconstruction               0-005-031  08/20/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-2-01        -2,985                  02/21/23   12/04/23    ULTIMATE POWER INC                  
                                                            MC-2-01        -2,985                  03/23/23     /  /      ULTIMATE POWER,INC                  
 
22-1469   Reconstruction               0-005-033  05/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0868SC Visual Structural Inspection 0-005-SC1  12/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0325   Visual Structural Inspection 0-005-SC2  11/07/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Moriches Elementary School:
90-0883   Reconstruction               0-009-001  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0014   Reconstruction               0-009-003  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1334   Additions and Alterations    0-009-004  06/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1409   Reconstruction               0-009-005  06/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0921   Reconstruction               0-009-006  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1338   Reconstruction               0-009-007  10/02/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-01           9,860                  11/10/04   04/28/05    JVR Electric Inc                    
                                                            EC-02          11,812                  01/05/05   12/18/06    JVR Electric                        
                                                            EC-03          19,326                  12/21/05   01/19/06    JVR Electric                        
                                                            EC-04           2,851                  04/12/06   12/18/06    JVR Electric                        
                                                            EC-05          13,340                  04/12/06   10/30/06    JVR Electric                        
                                                            EC-06          12,275                  04/12/06   10/30/06    JVR Electric                        
                                                            EC-07           3,745                  05/17/06   11/22/06    JVR Electric                        
                                                            GC-02          10,844                  11/19/03   11/21/03    Mannino Construction                
                                                            H-1             1,343                  12/08/05   04/26/06    REEL MECHNIACAL CONTRACTORS         
                                                            H-2            12,342                  12/08/05   05/24/06    REEL MECHANICAL CONTRACTORS, INC.   
                                                            H-3            12,903                  12/21/05   01/19/06    Reel mechanical Contractors         
                                                            H-6            11,653                  09/20/06   10/30/06    Reel mechanical Contractors         
                                                            H-7            15,290                  05/18/06   12/18/06    Reel mecahnical Contractors         
                                                            H-8             3,605                  05/18/06   11/22/06    Reel mechanical Contractors         
                                                            H-9             5,138                  06/15/06   07/27/06    Reel Mechanical                     
                                                            H4              2,498                  04/11/06   09/06/06    Reel mechanical                     
                                                            H5             14,823                  04/11/06   09/06/06    Reel mechanical                     
                                                            PC-01          -2,719                  11/10/04   04/28/05    hirsch Co                           
                                                            PC-02           3,954                  06/21/05   06/29/05    Hirsch Co                           
                                                            PC-03          14,101                  06/21/05   06/29/05    Hirsch Co                           
                                                            PC-04            -484                  04/12/06   06/30/06    Hirsch Co                           
 
04-1028   Reconstruction               0-009-008  05/23/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            L-2            15,436                  12/08/05   05/24/06    FERRAN DEVELOPMENT CORP.            
 
08-0586   Reconstruction               0-009-009  04/08/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1626   Reconstruction               0-009-012  05/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-3-01       102,831                  10/15/19   12/16/19    STATEWIDE ROOFING, INC.             
                                                            RC-3-02        48,605                  10/15/19   12/16/19    STATEWIDE ROOFING, INC.             
                                                            RC-3-03        77,873                  10/15/19   12/16/19    STATEWIDE ROOFING, INC.             
 
18-1350   Reconstruction               0-009-013  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1839   Reconstruction               0-009-014  07/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          34,709                  02/08/21   03/31/21    LEB ELECTRIC, LTD.                  
 
22-1119   Reconstruction               0-009-015  04/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0871SC Visual Structural Inspection 0-009-SC1  01/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tangier Smith Elementary:
90-0884   Reconstruction               0-010-001  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0018   Reconstruction               0-010-004  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1335   Additions and Alterations    0-010-006  06/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1410   Reconstruction               0-010-007  06/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0919   Reconstruction               0-010-008  04/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1355   Reconstruction               0-010-009  04/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-01          -1,000                  06/18/04   06/25/04    ASR Electrical                      
                                                            EC-02          94,775                  09/20/06   04/11/07    Elemco Electrical                   
                                                            EC-04          10,114                  03/25/05   01/03/06    Elemco Electrical Contract          
                                                            EC-05          17,030                  07/21/05   07/26/05    Elemco Electrical Contract          
                                                            EC-06             633                  09/16/05   09/21/05    Elemco Electrical Contractors       
                                                            GC-01          10,844                  11/19/03   11/21/03    Mannino Construction                
                                                            HC-02          12,208                  04/28/05   06/10/05    Major Systems                       
                                                            HC-03           8,620                  04/28/05   06/10/05    Major Systems                       
                                                            HC-04          11,700                  04/28/05   06/10/05    Major Systems                       
                                                            HC-05          15,527                  04/28/05   06/10/05    Major Systems                       
                                                            HC-06           8,874                  04/28/05   06/10/05    Major Systems                       
                                                            HC-07           4,397                  09/13/05   09/20/05    Major Systems                       
                                                            HC-A-01         6,122                  11/15/04   11/19/04    Major Systems                       
                                                            HCA-08          1,114                  12/19/05   04/21/06    Major Systems Inc                   
                                                            L-1             5,186                  12/08/05   05/24/06    FERRAN DEVELOPMENT CORP.            
                                                            PC-03           5,800                  07/29/04   08/05/04    Northeastern Plumbing               
                                                            PC-04          17,563                  11/10/04   06/21/05    Northeastern Plumbing Heating       
                                                            SC-02           5,265                  04/01/04   04/07/04    DF Stone Contracting                
 
18-1351   Reconstruction               0-010-014  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1840   Reconstruction               0-010-015  07/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03          15,465                  06/22/22   05/04/23    LEB Elec Ltd                        
                                                            EC-04          -2,982                  02/21/23   12/04/23    LEB ELECTRIC LTD                    
                                                            RC-01         -15,516                  09/23/20   02/10/21    RZ & AL WATERPROOFING               
 
22-1120   Reconstruction               0-010-016  04/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0874SC Visual Structural Inspection 0-010-SC1  01/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wm Paca MS (formerly JHS 7-9):
90-0885   Reconstruction               0-011-002  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0019   Reconstruction               0-011-003  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0111   Reconstruction               0-011-005  08/05/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0466   Reconstruction               0-011-006  12/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0016   Additions and Alterations    0-011-007  10/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-1            -5,000                  09/25/03   10/01/03    Mainline Elec.                      
                                                            E-1             4,372                  09/30/03   10/06/03    Elemco Elec.                        
                                                            E-10            3,650                  04/25/05   06/10/05    Elemco Electrical Construction      
                                                            E-2           130,243                  10/18/04   09/14/07    Elemco Elec.                        
                                                            E-3              -950                  10/18/04   11/08/04    Elemco Elec.                        
                                                            E-4             6,504                  11/05/04   11/29/04    Elemco Elec.                        
                                                            E-5             2,006                  11/05/04   11/29/04    Elemco Elec.                        
                                                            E-6             8,355                  12/23/04     /  /      Elemco Elec.                        
                                                            E-7            33,974                  12/23/04   03/02/05    Elemco Elec.                        
                                                            E-8            20,310                  12/23/04     /  /      Elemco Elec.                        
                                                            E-9            21,969                  12/23/04   08/15/07    Elemco Elec.                        
                                                            EC-01          -4,640                  01/04/05   04/27/05    JP Daly And Son                     
                                                            EC-05          19,382                  04/01/04   06/04/04    Palace Elec.                        
                                                            EC-06           3,600                  06/01/04   06/09/04    Palace Elec.                        
                                                            EC-07           3,725                  09/24/04   10/12/04    Palace Elec.                        
                                                            EC-08           8,585                  05/02/05   06/10/05    Palace electrical Contractors       
                                                            EC-09           2,475                  09/20/06   12/18/06    Palace Electrical                   
                                                            EC-1           40,300                  08/01/03   08/26/03    Palace Elec.                        
                                                            EC-3           73,000                  11/19/03   02/21/07    Palace Elec.                        
                                                            EQ-1          -20,000                  08/24/04   09/29/04    H&E Equipment                       
                                                            G-4            -5,277                  03/24/03   04/17/03    Fortunato Sons                      
                                                            G-5            72,732                  08/01/03   08/26/03    Fortunato Sons                      
                                                            G-6             6,022                  11/19/03   11/21/03    Fortunato Sons                      
                                                            G-7            21,132                  11/19/03   03/25/04    Fortunato Sons                      
                                                            G-8            37,119                  11/19/03   03/25/04    Fortunato Sons                      
                                                            G-9          -225,000                  12/10/03   12/31/03    Fortunato Sons                      
                                                            GC-01           8,895                  04/05/04   04/07/04    Aurora Contractors                  
                                                            GC-01           2,522                  11/09/04   11/19/04    Emcar Inc                           
                                                            GC-02           2,668                  11/09/04   11/19/04    Emcar Inc                           
                                                            GC-03          -5,000                  12/04/05   01/12/05    Emcar Inc                           
                                                            GC-04          47,335                  06/01/04   06/15/04    Aurora Contractors                  
                                                            GC-05          26,973                  09/24/04     /  /      Aurora Contractors                  
                                                            GC-06          15,082                  09/24/04   09/29/04    Aurora Contractors                  
                                                            GC-09          10,366                  04/28/05   06/10/05    Aurora Contractors Inc              
                                                            GC-B-02        32,400                  04/05/04   04/13/04    Aurora Contractors                  
                                                            GC-B-03        -6,400                  04/05/04   04/13/04    Aurora Contractors                  
                                                            GC-B-05        26,973                  11/17/04   11/23/04    Aurora Contractors                  
                                                            GC-B-07         4,527                  11/09/04   11/19/04    Aurora Contractors                  
                                                            GC-B-08         4,323                  01/05/05   01/25/05    Aurora Contractors                  
                                                            GCB-10          7,870                  06/21/05   06/30/05    Aurora Contractors                  
                                                            GCB-11         14,246                  06/21/05   06/29/05    Aurora Contractors                  
                                                            GCB-12          2,776                  06/21/05   06/29/05    Aurora Contractors                  
                                                            GCB-13          8,422                  06/21/05   06/29/05    Aurora Contractors                  
                                                            HC-03           5,460                  04/05/04   04/08/04    JNS Heating                         
                                                            HC-04           2,288                  04/05/04   06/04/04    JNS Heating                         
                                                            HC-06          16,214                  11/09/04   02/21/07    JNS Heating                         
                                                            HC-07             944                  06/21/05   06/29/05    JNS heating Service                 
                                                            HC-08         -30,000                  06/21/05   06/29/05    JNS heating Service                 
                                                            HC-1          192,879                  03/28/07     /  /      JNS heating Services                
                                                            M-1            10,130                  02/24/03   03/13/03    Servall Systems                     
                                                            M-2             5,101                  04/09/04   09/27/04    Servall Systems                     
                                                            M-3             2,231                  04/14/04   04/14/04    Servall Systems                     
                                                            M-4             6,813                  09/24/04   10/14/04    Servall Systems                     
                                                            P-1            11,498                  02/24/03   03/13/03    ARA Plumbing                        
                                                            P-2             1,632                  02/24/03   03/13/03    ARA Plumbing                        
                                                            P-3             3,899                  04/29/04   05/07/04    ARA Plumbing                        
                                                            PC-04          20,288                  04/01/04   06/04/04    Hirsch & Company                    
                                                            PC-05           5,481                  04/01/04   04/08/04    Hirsch & Company                    
                                                            PC-06           2,369                  11/09/04   12/18/06    Hirsch & Company                    
                                                            PC-07         -10,000                  01/05/05   04/28/05    Hirsch & Company                    
                                                            PC-1           31,851                  12/23/02   01/10/03    Hirsch & Company                    
                                                            S-1            16,571                  12/23/02   08/26/03    DF Stone                            
                                                            S-2               900                  06/24/03   07/11/03    DF Stone                            
                                                            SC-3           -4,817                  05/06/04   05/17/04    DF Stone                            
                                                            TC-01          26,892                  04/05/04   06/04/04    BBH Solutions                       
                                                            TC-02          -6,000                  12/08/05   12/15/05    BBH SOLUCTIONS, INC.                
 
02-0367   Reconstruction               0-011-010  01/09/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          15,836          15,836  05/06/04   05/19/04    Angelo Capobianco                   
                                                            RC-03          24,398                  12/29/04   01/10/05    Angelo Capobianco                   
 
04-1029   Reconstruction               0-011-011  05/23/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            39,060                  12/08/05   04/26/06    J.P. DALY & SONS, INC.              
                                                            E-4             2,234                  04/11/06   05/26/06    Jp Daly and Sons                    
                                                            EQ-1            2,320                  01/18/06   05/23/06    Nickerson Corp                      
                                                            EQ-2             -585                  05/17/06   06/23/06    Nickerson Corp                      
                                                            G-1            15,528                  12/08/05   05/24/06    ROCKMORE CONTRACTING CORPORATION    
                                                            G-3            -2,695                  10/27/06   12/18/06    Rockmore Contracting                
                                                            H-2            10,439                  12/08/05   05/24/06    JNS HEATING SERVICE, INC.           
                                                            H-5            17,721                  09/18/06   12/15/06    JNS heating Service                 
                                                            H-6             2,346                  06/11/07   08/28/07    JNS heating Service                 
 
08-0587   Reconstruction               0-011-012  04/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           13,293                  08/27/10   09/28/10    W.J. NORTHRIDGE CONSTRUCTION CORP   
 
05-1407   Reconstruction               0-011-013  04/06/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-2             3,779                  11/29/07   01/28/08    Carter-Melence,Inc.                 
                                                            G-3             1,621                  11/29/07   12/12/07    Carter-Melence,Inc.                 
 
17-1627   Reconstruction               0-011-015  08/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,020                  10/01/19   12/13/19    W.J. NORTHRIDGE CONSTRUCTION CORP.  
 
18-1352   Reconstruction               0-011-016  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1886   Reconstruction               0-011-017  08/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2-01         7,221                  01/22/21   04/09/21    WELSBACH ELECTRIC CORP. OF LI       
                                                            EC-2-02        15,099                  01/22/21   04/09/21    WELSBACH ELECTRIC CORP. OF LI       
                                                            EC-2-03           686                  01/22/21   04/09/21    WELSBACH ELECTRIC CORP. OF LI       
                                                            EC-2-04         4,358                  01/22/21   04/09/21    WELSBACH ELECTRIC CORP. OF LI       
                                                            EC-2-05         3,675                  01/22/21   04/09/21    WELSBACH ELECTRIC CORP. OF LI       
                                                            EC-2-06         7,042                  01/22/21   04/09/21    WELSBACH ELECTRIC CORP. OF LI       
                                                            SC-01          73,900                  02/19/20   06/04/20    LASER INDUSTRIES, INC.              
                                                            SC-02         136,456                  02/19/20     /  /      LASER INDUSTRIES, INC.              
                                                            SC-03          22,176                  02/19/20   06/04/20    LASER INDUSTRIES, INC.              
                                                            SC-04          47,868                  02/19/20   06/04/20    LASER INDUSTRIES, INC.              
                                                            SC-05          16,254                  02/19/20   06/04/20    LASER INDUSTRIES, INC.              
                                                            SC-06           1,500                  02/19/20   06/04/20    LASER INDUSTRIES, INC.              
 
03-0869SC Visual Structural Inspection 0-011-SC1  01/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Hobert Elementary:
91-0020   Reconstruction               0-012-004  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0112   Reconstruction               0-012-005  08/05/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1336   Additions and Alterations    0-012-006  06/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1108   Reconstruction               0-012-008  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0466   Additions and Alterations    0-012-009  04/11/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-1            81,000                  10/02/01   05/22/02    Weisbach Elec.                      
                                                            E-10            6,518                  11/19/03   01/08/04    Weisbach Elec.                      
                                                            E-12              699                  11/19/03   01/08/04    Weisbach Elec.                      
                                                            E-13            3,005                  06/01/04   06/09/04    Weisbach Elec.                      
                                                            E-14          -28,505                  04/28/05   12/18/06    Weisbach electric Corp              
                                                            E-2             4,300                  05/22/02   05/29/02    Weisbach Elec.                      
                                                            E-4            18,239                  05/10/03   05/23/03    Weisbach Elec.                      
                                                            E-7             8,710                  08/01/03   08/15/03    Weisbach Elec.                      
                                                            E-8             8,596                  09/25/03   10/22/03    Weisbach Elec.                      
                                                            EQ-1            8,120                  09/25/03   10/22/03    H&E Equipment                       
                                                            G-1           -13,275                  08/01/03   08/15/03    George Campbell Assoc.              
                                                            GC-04          58,579                  04/12/04   04/16/04    George Campbell Assoc.              
                                                            GC-06           1,173                  06/01/04   06/09/04    George Campbell Assoc.              
                                                            GC-07        -195,000                  05/21/07   06/21/07    George Campbell Associates          
                                                            GC-09         -15,000                  05/21/07   06/21/07    George Campbell                     
                                                            GC-11         -10,525                  05/21/07   06/21/07    George Campbell Associates          
                                                            GC-13         -86,689                  05/21/07   06/21/07    George Campbell                     
                                                            GC-15         -51,689                  05/21/07   06/21/07    George Campbell Associates          
                                                            GC-17         -53,689                  05/21/07   06/21/07    George Campbell Associates          
                                                            GC-19         -23,387                  05/21/07   06/22/07    George Campbell Associates          
                                                            H-1            40,388                  05/22/02   05/29/02    JNS Heating                         
                                                            H-3            22,701                  04/06/04   04/27/04    JNS Heating                         
                                                            HC-04           5,552                  04/06/04   04/28/04    JNS Heating                         
                                                            HC-05           5,430                  06/01/04   06/09/04    JNS Heating                         
                                                            P-1            42,535                  05/22/02   05/29/02    ARA Plumbing                        
                                                            P-5             5,314                  06/24/03   07/11/03    ARA Plumbing                        
                                                            PC-06           2,618                  04/06/04   04/27/04    ARA Plumbing                        
                                                            TC-01           2,467                  12/18/03   01/08/04    CBS Whitcom                         
 
08-0588   Reconstruction               0-012-010  04/08/09  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1353   Reconstruction               0-012-012  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1271   Reconstruction               0-012-013  04/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -19,802                  03/10/21   04/30/21    ELDOR CONTRACTING CORP.             
                                                            EC-02          20,107                  05/17/21   08/16/21    LEB ELECTRIC, LTD                   
 
22-1121   Reconstruction               0-012-014  04/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0873SC Visual Structural Inspection 0-012-SC1  01/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wm Floyd Middle School (frmrly NewMS:
00-0551   New Construction             0-053-001  04/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,961                  03/01/02   04/17/02    Aurora Contractors                  
                                                            1              37,351                  11/20/02   12/02/02    Eldor Contracting                   
                                                            1              14,041                  04/08/03   04/17/03    Manning Plumbing                    
                                                            1              16,355                  09/13/04   10/25/04    JNS Heating                         
                                                            1              12,120                  09/12/05   09/22/05    Telcar group                        
                                                            10             16,863                  11/12/04   11/24/04    Aurora Contractors                  
                                                            11             25,000                  04/25/05   06/21/05    Aurora Contractors                  
                                                            2              73,758                  10/23/02   04/17/03    Aurora                              
                                                            2              86,964                  04/08/03   04/17/03    Eldor                               
                                                            2              14,237                  04/23/04   04/28/04    Manning Plumbing                    
                                                            2                -486                  02/10/06     /  /      JNS heating Service                 
                                                            3              66,900                  10/23/02     /  /      Aurora                              
                                                            3              58,900                  04/08/03   04/17/03    Aurora                              
                                                            3              95,999                  04/08/03   04/17/03    Eldor                               
                                                            3               7,806                  04/23/04   04/28/04    Manning Plumbing                    
                                                            4               7,471                  04/08/03   04/17/03    Aurora                              
                                                            4              49,676                  11/18/03   11/21/03    Eldor                               
                                                            5              28,630                  04/08/03   04/17/03    Aurora                              
                                                            5              19,857                  06/21/04   07/21/04    Eldor Contracting                   
                                                            6              72,209                  04/08/03   04/17/03    Aurora                              
                                                            6              17,639                  06/21/04   07/21/04    Eldor Contracting                   
                                                            7              30,176                  04/08/03   04/17/03    Aurora                              
                                                            7              11,347                  06/21/04   07/21/04    Eldor Contracting                   
                                                            8              64,354                  01/13/04   02/18/04    Aurora                              
                                                            8              19,156                  06/21/04   07/21/04    Eldor Contracting                   
                                                            9               8,975                  10/07/04     /  /      Eldor Contracting                   
                                                            9               8,119                  11/12/04   11/24/04    Aurora                              
                                                            9               8,975                  11/07/05   05/05/06    ELDOR CONTRACTING CORPORATION       
 
08-0589   Reconstruction               0-053-002  04/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,306                  03/05/12   10/22/12    STATEWIDE ROOFING INC               
 
18-1354   Reconstruction               0-053-004  04/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1887   Reconstruction               0-053-005  08/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-01        -53,228                  03/10/21   04/30/21    ELDOR CONTRACTING CORP.             
                                                            GC-01         -11,272                  03/26/21   06/22/21    PELLA GENERAL CONTRACTING CORP.     
 
03-0870SC Visual Structural Inspection 0-053-SC1  01/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building @ Tangier Elem:
06-1269   Reconstruction               2-054-001  04/06/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            12,761                  11/29/07   01/28/08    Carter-Melence,Inc.                 
                                                            G-4             5,126                  11/29/07   01/28/08    Carter-Melence,Inc.                 
 

          MasticsMorichesShirleyComLibrary:
93-0097   Additions and Alterations    6-007-001  10/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0972   Reconstruction               6-007-003  01/24/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0969   Reconstruction               6-007-004  12/14/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0026   Reconstruction               6-007-005  07/07/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0170   Reconstruction               6-007-006  09/17/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1442   Reconstruction               6-007-008  06/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1441   Reconstruction               6-007-009  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1399SR Reconstruction               6-007-010  06/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1925   Reconstruction               6-007-010  09/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Moriches Branch (New):
20-0762   New Construction             6-056-001  07/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mastic Beach Annex:
20-1018   Reconstruction               6-057-002  04/14/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field House w Press Box at HS:
96-0205   New Construction             7-052-001  09/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1517   Additions and Alterations    7-052-002  06/30/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01        -188,985                  05/27/21   04/07/22    Axis Construction Corp              
                                                            GC-01           1,302                  01/09/23   12/07/23    PATRIOT ORG INC                     
 

          District-Wide:
92-0321   Reconstruction               7-999-002  10/16/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0344   Reconstruction               7-999-003  10/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0696   Reconstruction               7-999-004  01/06/98  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0100   Reconstruction               7-999-007  12/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2           16,186                  12/08/09   01/15/10    COOPER POWER & LIGHTING CORP        
                                                            EC-3           16,835                  12/23/09   02/12/10    COOPER POWER & LIGHTING CORP        
                                                            EC1             8,265                  12/08/09   01/15/10    COOPER POWER & LIGHTING CORP        
                                                            GC-1           -1,395                  10/22/10   11/01/10    CDWG                                
                                                            HC-1          -15,000                  02/04/10   04/16/10    ACE SHORE MECHANICAL INC            
                                                            SEC-1         -10,555                  10/22/10   11/01/10    PROTECTIVE MANAGEMENT SYSTEMS INC   
 
19-1254   Reconstruction               7-999-008  04/14/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0698   Reconstruction               7-999-009  05/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1113   Reconstruction               7-999-010  04/14/20  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1787   Reconstruction               7-999-011  04/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

CENTER MORICHES UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-33-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Clayton Huey Elem. School:
91-1587   Reconstruction               0-001-004  07/16/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1176   Reconstruction               0-001-005  06/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0553   Reconstruction               0-001-006  03/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1186   Additions and Alterations    0-001-008  11/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,500                  01/22/03   04/06/05    Seaman Electric                     
                                                            10            -17,000                  06/30/03   09/24/03    MH Kane Const.                      
                                                            11             11,510                  06/30/03     /  /      MH Kane Const.                      
                                                            12-13R        -37,000                  08/19/03   10/23/03    MH Kane Const.                      
                                                            2              30,710                  05/15/03   05/27/03    MH Kane Const.                      
                                                            3              23,000                  05/15/03   05/27/03    MH Kane Const.                      
                                                            3               4,122                  01/22/03   04/15/05    Excel Mechanical                    
                                                            4               2,474                  05/15/03   05/27/03    MH Kane Const.                      
                                                            5               2,405                  05/15/03   05/27/03    MH Kane Const.                      
                                                            6               2,576                  05/15/03   05/27/03    MH Kane Const.                      
                                                            7              20,000                  06/30/03   09/24/03    MH Kane Const.                      
                                                            8               2,356                  06/30/03   09/10/03    MH Kane Const.                      
                                                            9               3,500                  06/30/03   09/10/03    MH Kane Const.                      
 
06-0248   Reconstruction               0-001-011  10/24/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1496   Reconstruction               0-001-013  08/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 930                  03/22/10   06/01/10    SJ HOERNING CONSTRUCTION            
                                                            1                  -3                  07/08/11   08/16/11    MAJESTIC PLUMBING CORP              
                                                            E-1           -35,394                  05/04/11   05/25/11    SJ HOERNING CONSTRUCTION            
                                                            F-1            -8,900                  07/08/11   09/09/11    HEALTH & EDUCATIONAL EQUIPMENT CORP 
                                                            GC-1                0                  05/04/11   06/03/11    TRI-RAIL CONSTRUCTION               
                                                            M-1            -7,900                  05/04/11   05/25/11    CENTRAL AIR CORPORATION             
 
09-0751   Reconstruction               0-001-014  10/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0632   Reconstruction               0-001-015  04/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One            11,253                  10/20/16   10/25/16    DF Stone Contracting                
                                                            One                 0                  01/12/17   01/18/17    Milcon Construction                 
 
16-0040   Reconstruction               0-001-016  12/05/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,250                  04/16/18   04/17/18    Seaford Avenue Corp.                
                                                            1              27,830                  07/24/18   08/01/18    ACL CONSTRUCTION CORP               
                                                            1              17,000                  09/13/18   09/27/18    GEMINIA ELECTRIC                    
                                                            H-1            -1,700                  01/25/19   02/25/19    CENTRAL AIR CORP.                   
 
21-0283   Reconstruction               0-001-017  02/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0291   Reconstruction               0-001-018  01/24/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0937   Reconstruction               0-001-019  04/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School/ Middle School:
93-0554   Alterations                  0-006-004  03/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1694SR Additions and Alterations    0-006-006  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
01-0139   Additions and Alterations    0-006-006  06/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            #9              7,035                  02/04/04   10/30/08    SULLIVIAN & NICKEL                  
                                                            001            35,066                  01/07/02     /  /      Sullivan and Nickel                 
                                                            001          -141,185                  11/09/04   12/06/04    Adjo Contracting                    
                                                            001          -118,707                  11/09/04   12/06/04    Hinck Elec.                         
                                                            1              56,232                  04/03/02     /  /      Hinck Elec.                         
                                                            1             130,000                  10/29/02     /  /      McDowell Elec.                      
                                                            1               4,700                  10/29/02   11/01/02    Best Climate Control                
                                                            1              23,990                  01/22/03   04/15/05    Van Tag                             
                                                            1              21,677          21,677  01/22/03   04/15/05    Long Island Mech.                   
                                                            1              10,000                  01/22/03   04/15/05    Pirraglia Contracting               
                                                            1              16,938                  06/16/03   07/11/03    ARA Plumbing                        
                                                            1               9,600                  06/16/03   07/11/03    Telecar Group                       
                                                            10              4,329                  06/10/03   07/14/03    Van Tag                             
                                                            10              1,189                  02/09/04   03/08/04    ARA Plumbing                        
                                                            10              1,717                  02/09/04   03/08/04    Long Island Mech.                   
                                                            10              4,676                  06/04/07   08/07/07    McDowell Electric                   
                                                            11             25,185                  06/16/03   07/11/03    McDowell Elec.                      
                                                            11              7,540                  06/10/03   07/14/03    Van Tag                             
                                                            12              6,658                  06/10/03   07/14/03    Van Tag                             
                                                            12             16,200                  06/04/07   08/07/07    McDowell Electric                   
                                                            13              3,156                  06/16/03   07/11/03    McDowell Elec.                      
                                                            13             12,326                  06/10/03   07/14/03    Van Tag                             
                                                            14              1,097                  06/10/03   07/14/03    Van Tag                             
                                                            14             23,180               3  09/24/03   10/30/08    McDowell Elec.                      
                                                            15              1,808                  06/10/03   07/14/03    Van Tag                             
                                                            15             11,223                  06/04/07   08/07/07    McDowell Electric                   
                                                            16             13,344                  10/01/03   11/17/03    Van Tag                             
                                                            16             21,647                  06/04/07   08/07/07    McDowell Electric                   
                                                            17              7,174                  06/04/07   06/20/07    Van tag Contracting                 
                                                            17                588                  06/04/07   08/07/07    McDowell Electric                   
                                                            18             24,647                  09/24/03   10/30/08    McDowell Elec.                      
                                                            18              1,696                  10/01/03   11/17/03    Van Tag                             
                                                            19             36,826                  09/24/03   10/30/08    McDowell Electric                   
                                                            19             25,243                  06/04/07   06/20/07    Van tag Contracting                 
                                                            2              23,349                  01/22/03   04/15/05    Van Tag                             
                                                            2               7,180                  06/16/03   07/11/03    Ruttura Concrete                    
                                                            2               1,500           1,500  06/16/03   07/11/03    Long Island Mech.                   
                                                            2               3,152           3,152  02/09/04   05/15/07    ARA Plumbing                        
                                                            2              64,387                  10/29/02     /  /      McDowell Electric                   
                                                            2              11,162                  06/04/07   06/20/07    Pirraglia Contracting               
                                                            20             10,721                  10/01/03   11/26/03    Van Tag                             
                                                            20              7,500                  06/04/07   08/07/07    McDowell Electric                   
                                                            21              3,840                  06/04/07   06/20/07    Van tag Contracting                 
                                                            21             38,156                  06/04/07     /  /      McDowell Electric                   
                                                            22              2,730                  10/01/03   11/26/03    Van Tag                             
                                                            22              6,736                  06/04/07   08/07/07    McDowell Electric                   
                                                            23                405                  10/17/03   11/18/03    Van Tag                             
                                                            23             31,760                  06/04/07   08/07/07    McDowell Electric                   
                                                            24              3,150                  10/17/03   11/18/00    Van Tag Contracting                 
                                                            24              3,150                  06/04/07   06/20/07    Van Tag Construction                
                                                            24              7,097                  06/04/07   08/07/07    MCDowell Electric                   
                                                            25              2,855                  10/17/03   11/18/03    Van Tag                             
                                                            25             36,500                  02/09/04     /  /      McDowell Elec.                      
                                                            26              2,091                  02/09/04   05/15/07    McDowell Elec.                      
                                                            26              2,475                  10/17/03   11/18/03    Van Tag Contracting                 
                                                            26              2,475                  06/04/07   06/20/07    Van Tag Contracting                 
                                                            27              2,239                  10/17/03   11/18/03    Van Tag                             
                                                            27              4,351                  02/09/04   10/30/08    McDowell Elec.                      
                                                            28              5,100                  03/08/04   04/26/04    McDowell Elec.                      
                                                            28              6,494                  06/04/07   06/20/07    Van Tag Contracting                 
                                                            29             15,330                  10/17/03   11/18/03    Van Tag                             
                                                            29              9,722                  02/09/04   10/30/08    McDowell Elec.                      
                                                            3              48,447                  01/22/03   10/30/08    McDowell Elec.                      
                                                            3              12,265                  06/16/03   07/11/03    Pirraglia Contracting               
                                                            3             -15,612                  02/09/04   03/03/04    Ruttura Concrete                    
                                                            3               2,866           2,866  02/09/04   10/30/08    ARA Plumbing                        
                                                            3               9,839                  06/04/07   06/20/07    Van tag Corp                        
                                                            3              45,945                  06/04/07   08/07/07    Long Island mechanicla              
                                                            30             15,862                  02/09/04   10/30/08    McDowell Elec.                      
                                                            30             12,000                  02/09/04   03/08/04    Van Tag                             
                                                            31              7,896                  02/09/04   03/08/04    Van Tag                             
                                                            32              5,275                  02/09/04   03/08/04    Van Tag                             
                                                            33              2,020                  02/09/04   03/08/04    Van Tag                             
                                                            34              5,618                  02/09/04   03/08/04    Van Tag                             
                                                            35              1,987                  02/09/04   03/08/04    Van Tag                             
                                                            36              2,903                  02/09/04   03/08/04    Van Tag                             
                                                            37              1,008                  02/09/04   03/08/04    Van Tag                             
                                                            38              6,809                  02/09/04   03/08/04    Van Tag                             
                                                            39              5,941                  02/09/04   03/08/04    Van Tag                             
                                                            4              11,387                  01/22/03   04/15/05    Van Tag                             
                                                            4              35,000                  06/16/03   07/11/03    Long Island Mech.                   
                                                            4               8,362           8,362  03/08/04   04/26/04    ARA Plumbing                        
                                                            4               2,240                  06/04/07   06/20/07    Pirraglia Contracting               
                                                            4             186,939                  06/04/07     /  /      McDowell Electric                   
                                                            40             13,835                  02/09/04   03/08/04    Van Tag                             
                                                            41              5,608                  02/09/04   03/08/04    Van Tag                             
                                                            42              4,578                  02/09/04   03/08/04    Van Tag                             
                                                            43             22,622                  02/09/04   03/08/04    Van Tag                             
                                                            44             -2,425                  02/09/04   03/03/04    Van Tag                             
                                                            5               9,200                  01/22/03   04/15/05    McDowell Elec.                      
                                                            5              16,618                  06/04/07   06/20/07    Van tag Corporation                 
                                                            5               3,360                  06/04/07   06/20/07    Pirraglia Contracting               
                                                            5               2,500                  06/04/07   08/07/07    Long Island Mechanical              
                                                            5               6,160                  06/04/07   10/22/07    ARA Plumbing                        
                                                            6               9,539                  06/10/03   07/14/03    Van Tag                             
                                                            6               3,791                  02/09/04   11/29/05    ARA Plumbing                        
                                                            6               5,719                  02/09/04   10/30/08    Long Island Mech.                   
                                                            6              26,674                  06/04/07   08/07/07    MCDowell Electric                   
                                                            7              33,077                  01/22/03   04/15/05    McDowell Elec.                      
                                                            7               3,018                  06/10/03   07/14/03    Van Tag                             
                                                            7               1,160           1,160  02/09/04   11/29/05    ARA Plumbing                        
                                                            7               2,986                  02/09/04   10/30/08    Long Island Mech.                   
                                                            8               1,071                  06/10/03   07/14/03    Van Tag                             
                                                            8                 678             678  02/09/04   11/29/05    ARA Plumbing                        
                                                            8               3,644                  02/09/04   03/08/04    Long Island Mech.                   
                                                            8              45,350                  06/04/07   08/07/07    MCDowell Electric                   
                                                            9               7,035                  01/22/03   04/15/05    McDowell Elec.                      
                                                            9               5,394                  06/10/03   07/14/03    Van Tag                             
                                                            9                 441                  02/09/04   11/29/05    ARA Plumbing                        
                                                            9               1,288                  02/09/04   03/08/04    Long Island Mech.                   
                                                            C2-1           34,106                  06/07/04   07/09/04    Maryland Fabricators                
                                                            C6-1           10,890                  12/20/04   12/30/04    Metropolitan Roof Systems           
                                                            PCO-S012       23,990                  08/22/08   05/11/09    SULLIVAN & NICKEL                   
 
06-0100   Reconstruction               0-006-007  08/18/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,150                  05/18/07   06/18/07    Vezandio Contracting                
                                                            1                -875                  10/19/07   10/26/07    C & M DOOR CONTROLS, INC.           
 
09-0752   Reconstruction               0-006-009  10/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1246   Reconstruction               0-006-010  07/13/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -2,800                  06/24/13   11/25/13    RENU CONTRACTING & RESTORATION      
 
14-1564   Reconstruction               0-006-011  06/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0633   Reconstruction               0-006-012  04/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3             -50,000                  06/05/17   06/23/17    Milcon Construction                 
                                                            Two                 0                  01/12/17   01/18/17    Milcon Construction                 
 
16-0041   Reconstruction               0-006-013  12/05/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,761                  01/02/18   01/31/18    Hirsch & Co., LLC                   
                                                            1              -4,591                  01/02/18   01/25/18    Renu Contracting & Restoration      
                                                            One           -10,000                  02/12/18   03/08/18    JNS Heating Service                 
 
21-0284   Reconstruction               0-006-014  02/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0292FC Reconstruction               0-006-015  01/24/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0128   Reconstruction               0-006-016  11/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1978   Reconstruction               0-006-017  05/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
00-1623   Additions and Alterations    1-003-001  11/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              40,000                  05/13/02   06/05/02    MH Kane Const.                      
                                                            1 and 2         7,873                  10/29/02   02/13/03    Excel Mech.                         
 
09-0753   Reconstruction               1-003-002  10/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0285   Reconstruction               1-003-003  02/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Building:
00-1038   New Construction             3-016-001  06/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0754   Reconstruction               3-016-002  10/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0286   Reconstruction               3-016-003  02/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Public Library:
99-1626   Reconstruction               6-003-001  06/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1627   Reconstruction               6-003-002  06/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0061   Reconstruction               6-003-005  07/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0045   Additions and Alterations    6-003-007  08/17/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,568                  04/29/13   07/16/13    HIRSCH & CO                         
                                                            1             -17,177                  06/17/13   07/11/13    Fleet Mechanical Systems            
                                                            1             -40,383                  06/10/13   07/31/13    SIGMA CONTRACTING CORP              
 
17-2045   Reconstruction               6-003-009  08/10/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              31,000                  04/01/19   04/02/19    ARROW STEEL WINDOW CORP.            
                                                            1              28,031                  11/07/19   11/12/19    ARROW STEEL WINDOW CORP.            
 
19-0537   Additions and Alterations    6-003-010  08/24/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          39,347                  02/10/22   02/13/23    RENU Contr&Restor Inc               
                                                            GC-01          39,347                  08/18/22   12/11/23    RENU Contrg&Restore Inc             
                                                            GC-02          21,408                  08/18/22   12/11/23    RENU Contrg and Restore Inc         
                                                            GC-03          25,750                  08/18/22   12/11/23    RENU Contrg&Restore Inc             
                                                            GC-04           9,917                  08/18/22   12/11/23    RENU Contrg&Restore Inc             
                                                            GC-2           21,408                  03/17/22   03/30/23    RENU Contr&Restore Inc              
 
20-1873   Reconstruction               6-003-011  09/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Community Center:
07-2088   New Construction             7-020-001  05/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE

EAST MORICHES UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-34-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          East Moriches School:
92-1268   Reconstruction               0-001-007  06/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1124   Reconstruction               0-001-008  03/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0496   Reconstruction               0-001-009  12/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0863   Reconstruction               0-001-010  10/21/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              37,200                  03/24/04   07/22/04    Norman Kurass Contracting           
                                                            1              20,361                  10/12/04   10/25/04    Lipsky Enterprise                   
                                                            1              19,400                  10/12/04   10/27/04    Palace Electric Contractors         
                                                            1                 505                  12/30/04   01/12/05    Thermo Tech                         
                                                            1                   0                  02/24/06   07/24/06    ICAS Corp (this contrtr not on FCR) 
                                                            2               3,397                  07/01/04   07/21/04    Norman Kurass Contracting           
                                                            2              15,785                  11/29/04   12/17/04    Lipsky Enterprises                  
                                                            2               2,550                  12/30/04   06/05/14    Palace Electric Contractors         
                                                            2               5,235                  02/13/06   08/08/06    thermo Tech Combustion              
                                                            3               1,697                  04/13/05   04/26/05    Lipsky Enterprises                  
 
00-1752   Reconstruction               0-001-012  06/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,125                  08/07/02   08/16/02    Intercounty Mech.                   
                                                            1              40,345                  03/08/03   03/18/03    Milcon Const.                       
                                                            2                 481                  01/22/03   02/10/03    Intercounty Mech.                   
                                                            2              -8,313                  06/05/03   06/10/03    Milcon Const.                       
                                                            3               1,807                  06/05/03   06/10/03    Intercounty Mech.                   
                                                            3               4,380                  08/19/03   09/16/03    Milcon Const.                       
 
00-1751   Reconstruction               0-001-013  06/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,767                  10/16/02   10/30/02    JR Contracting and Environ. Consult 
 
08-1075   Reconstruction               0-001-014  02/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE            -7,500                  01/15/10   02/26/10    STATEWIDE ROOFING INC               
 
08-1652   Reconstruction               0-001-015  06/25/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE             7,352                  02/07/11   02/24/11    BAIN MECHANICAL SERVICES INC        
 
11-0704   Reconstruction               0-001-016  03/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1258   Reconstruction               0-001-017  07/02/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One             1,000                  08/29/13   09/13/13    DM Restoration Inc.                 
 
13-0430   Reconstruction               0-001-018  04/04/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            One             4,089                  09/17/14   09/29/14    Irwin Contracting Inc.              
 
17-0860   Reconstruction               0-001-020  06/13/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -40,000                  09/30/19   10/07/19    ROLAND'S ELECTRIC, ICN.             
                                                            1              11,100                  10/03/19   10/10/19    ACL CONSTRUCTION CORP.              
 
20-1424   Reconstruction               0-001-021  07/10/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0721   Reconstruction               0-001-022  03/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0499EP Energy Project               0-001-E01  01/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0285FP Reconstruction               0-001-FP1  10/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          East Moriches Elementary School:
01-0297   New Construction             0-009-001  06/02/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             446,500                  11/29/02   01/08/03    EW Howell Company                   
                                                            1               2,136                  07/03/03   07/11/03    Long Island Mech.                   
                                                            1              13,548                  12/03/03   12/09/03    Northgate Elec.                     
                                                            1               4,140                  12/03/03   01/08/04    Majestic Plumbing                   
                                                            1              14,362                  10/20/04   11/15/04    Northgate Elec.                     
                                                            1                 375                  12/30/04   01/12/05    Bar Boy Products                    
                                                            10              6,000                  11/03/03   11/20/03    EW Howell Company                   
                                                            11              2,167                  11/03/03   11/20/03    EW Howell Company                   
                                                            12              6,280                  11/03/03   11/20/03    EW Howell Company                   
                                                            13             75,000                  11/03/03   11/20/03    EW Howell Company                   
                                                            14             48,000                  11/03/03   11/20/03    EW Howell Company                   
                                                            15            -39,100                  11/03/03   11/20/03    EW Howell Company                   
                                                            16            -33,144                  11/03/03   11/20/03    EW Howell Company                   
                                                            17              1,232                  11/03/03   11/20/03    EW Howell Company                   
                                                            18              6,969                  11/03/03   11/20/03    EW Howell Company                   
                                                            19              3,883                  11/03/03   12/22/03    EW Howell Company                   
                                                            2               4,510                  03/10/03   03/18/03    EW Howell Company                   
                                                            2               6,497                  12/03/03   12/09/03    Majestic Plumbing                   
                                                            2               1,701                  12/03/03   12/09/03    Northgate Elec.                     
                                                            2               4,346                  01/05/04   01/14/04    McDowell Elec.                      
                                                            2              28,743                  01/13/04     /  /      Long Island Mech.                   
                                                            20            -64,813                  11/03/03   11/20/03    EW Howell Company                   
                                                            21             18,000                  11/03/03   11/20/03    EW Howell Company                   
                                                            22                  0                  11/10/03   11/21/03    EW Howell Company                   
                                                            23             10,344                  01/05/04   02/23/04    EW Howell Company                   
                                                            24              3,044                  01/05/04   01/16/04    EW Howell Company                   
                                                            25              4,798                  01/05/04   01/16/04    EW Howell Company                   
                                                            26             45,985                  01/13/04   02/23/04    EW Howell Company                   
                                                            27             18,153                  01/13/04   01/16/04    EW Howell Company                   
                                                            28              6,094                  01/13/04   01/16/04    EW Howell Company                   
                                                            29             11,552                  02/04/04   02/20/04    EW Howell Company                   
                                                            3               2,100                  10/29/02     /  /      Bove Industries                     
                                                            3              22,017                  05/10/04   09/09/04    Majestic Plumbing                   
                                                            3              10,498                  05/10/04   05/17/04    Long Island Mech.                   
                                                            3               2,809                  05/10/04   05/17/04    Northgate Elec.                     
                                                            3             135,125                  09/20/04   10/01/04    EW Howell Company                   
                                                            30             23,764                  02/04/04   02/23/04    EW Howell Company                   
                                                            31             18,774                  05/10/04   05/17/04    EW Howell Company                   
                                                            32             62,878                  05/10/04   06/25/04    EW Howell Company                   
                                                            33             22,416                  05/10/04   09/09/04    EW Howell Company                   
                                                            34             18,315                  09/13/04   10/04/04    EW Howell Company                   
                                                            35             19,832                  09/13/04   11/23/04    EW Howell Company                   
                                                            36              9,547                  09/13/04   11/15/04    EW Howell Company                   
                                                            37             15,706                  12/08/04   12/24/04    EW Howell Company                   
                                                            38             24,000                  11/29/04   12/13/04    EW Howell Company                   
                                                            39             10,603                  11/29/04   12/06/04    EW Howell Company                   
                                                            4               5,051                  05/06/03   05/08/03    EW Howell Company                   
                                                            4                -500                  03/29/04   04/06/04    Bove Industries                     
                                                            4              14,780                  03/29/04   06/04/04    McDowell Elec.                      
                                                            4               9,245                  06/14/04   06/25/04    Long Island Mech.                   
                                                            4               2,836                  09/13/04   09/21/04    Majestic Plumbing                   
                                                            4              19,706                  09/13/04   11/22/06    Northgate Elec.                     
                                                            40             16,902                  12/30/04   01/12/05    EW Howell Company                   
                                                            41             13,512                  10/11/05   10/28/05    EW Howell Co                        
                                                            42            121,537                  12/23/05   12/28/05    Ew howell Co                        
                                                            43             69,789                  12/23/05   12/28/05    Ew Howell Co Inc                    
                                                            5              28,748                  05/06/03   05/08/03    EW Howell Company                   
                                                            5              50,000                  09/03/04   11/22/06    Long Island Mech.                   
                                                            5               5,000                  09/03/04   12/05/06    Majestic Plumbing                   
                                                            5              18,217                  09/13/04   12/05/06    Northgate Elec.                     
                                                            6               3,526                  06/30/03   07/02/03    EW Howell Company                   
                                                            6              19,648                  09/03/04   07/31/06    Northgate Elec.                     
                                                            6              12,073                  10/20/04     /  /      Long Island Mech.                   
                                                            6               3,254                  11/29/04   12/06/04    Majestic Plumbing                   
                                                            7               4,264                  09/16/03   09/19/03    EW Howell Company                   
                                                            7              65,000                  09/03/04   12/05/06    Northgate Elec.                     
                                                            7              10,051                  04/13/05   04/21/05    Majestic Plumbing Consulting        
                                                            8               2,018                  11/03/03   11/20/03    EW Howell Company                   
                                                            9               2,887                  11/03/03   11/20/03    EW Howell Company                   
 
20-1279   Reconstruction               0-009-002  05/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0722   Reconstruction               0-009-003  03/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

SOUTH COUNTRY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-02-35-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          South Haven Primary School:
94-0400   Reconstruction               0-001-002  01/23/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1140   Reconstruction               0-001-003  05/12/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0806   Reconstruction               0-001-004  06/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -40,467                  01/09/09   05/22/09    STALCO CONSTRUCTION INC.            
 
18-1957   Reconstruction               0-001-005  07/11/19  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1544EP Energy Project               0-001-E01  07/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Kreamer Street Elementary:
93-1302   Additions and Alterations    0-002-003  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1141   Reconstruction               0-002-004  05/12/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1584   Additions and Alterations    0-002-005  07/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0906   Reconstruction               0-002-006  03/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,000                  02/10/05   02/24/05    Rolands Electric                    
 
05-0546   Additions and Alterations    0-002-007  04/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -8,197                  06/22/09   09/23/09    MAINLINE ELECTRIC CORP              
                                                            1             -13,334                  07/21/10     /  /      NRI CONSTRUCTION                    
                                                            1              17,607                  07/21/10     /  /      ARA PLUMBING CORP                   
                                                            1               9,922                  07/21/10     /  /      JNS HEATING SERVICE                 
 
07-1775   Reconstruction               0-002-008  01/09/09  *C