Change Order Status - St. Lawrence


BRASHER FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-01-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Middle/High School:
96-0787   Reconstruction               0-001-003  03/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1295   Reconstruction               0-001-004  05/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0453   Additions and Alterations    0-001-005  05/05/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1-0010         13,089                  08/29/06   10/13/06    Bette Cring                         
                                                            1-002        -589,055                  09/02/04   09/23/04    Bette & Cring                       
                                                            1-003         -10,150                  09/27/04   10/14/04    Bette & Cring                       
                                                            1-004           3,146                  01/13/06   11/12/08    Bette Cring                         
                                                            1-004           3,146                  10/22/08     /  /      BETTE & CRING, LLC                  
                                                            1-005          19,890                  10/27/05   12/05/05    Bette Cring                         
                                                            1-008          19,062                  05/17/06   06/23/06    Bette Cring                         
                                                            1-013          36,570                  11/30/06   01/09/07    Bette Cring                         
                                                            1-014           1,740                  03/12/07   03/14/07    Bette Cring                         
                                                            1-016           6,271                  03/29/07   04/03/07    Bette Cring                         
                                                            2-001          60,433                  07/29/05   08/03/05    RSI Roofing Inc.                    
                                                            2-002          72,000                  10/04/05   10/13/05    RSI Roofing                         
                                                            2-003          16,550                  11/01/05   11/08/05    RSi roofing                         
                                                            3-001         -19,170                  09/02/04   09/23/04    Northern Mech.                      
                                                            3-002         -21,020                  09/29/04   10/14/04    Northern Mech.                      
                                                            3-004           3,691                  02/10/06   05/23/06    Northern Mechanical                 
                                                            3-005          17,300                  03/14/07   04/25/07    Northern Mechanical                 
                                                            3-006          13,068                  03/26/07   04/25/07    Northern Mechanicals                
                                                            4-003           5,325                  01/17/07   02/09/07    Norwood Plumbing                    
                                                            5-001          -9,715                  09/02/04   09/24/04    Collins Hammond Electrical          
                                                            5-002               0                  12/22/04   06/21/05    Collins Hammond Electric            
                                                            5-003           4,150                  01/13/06   04/13/09    Collins Hammond Electrical          
                                                            5-003           4,150                  10/22/08     /  /      COLLINS - HAMMOND ELECTRICAL, INC.  
                                                            5-004           7,612                  10/12/05   10/17/05    collins Hammond Electrical          
                                                            5-009           3,122                  06/07/07   10/22/07    Collins Hammond Electrical          
                                                            5-010           2,069                  06/14/07   10/23/07    Collins Hammond Electric            
                                                            6-003           8,253                  07/28/06   08/09/06    AAC Contracting                     
                                                            6-004          16,800                  10/19/06   12/18/06    AAC Contracting                     
                                                            6-005          -2,117                  01/30/08   04/14/05    A.A.C contracting                   
 
07-1688   Reconstruction               0-001-006  10/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-01           10,580                  05/11/09   07/28/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-01            1,162                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-02           16,500                  08/05/09   09/02/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-02            5,214                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-03           16,500                  08/05/09   09/02/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-03            1,217                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-04           17,883                  08/05/09   09/02/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-05           16,673                  09/17/09   09/24/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-05 REV        1,062                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-07              834                  10/02/09   11/19/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-08            1,221                  10/02/09   11/19/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-09R           5,723                  11/10/09   12/04/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-10           14,633                  11/20/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-11            2,591                  11/20/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-12            4,552                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-15            3,658                  01/12/10   04/02/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-17            7,896                  02/01/10   03/16/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-19            2,508                  02/09/10   04/30/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-20            4,391                  03/10/10   05/25/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-21            7,844                  03/10/10   05/25/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-22           19,563                  03/22/10   06/14/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-23            4,092                  03/22/10   06/14/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-26           16,243                  03/30/10   05/28/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-28            8,995                  04/26/10   07/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-29            3,628                  04/26/10   07/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-31            5,922                  12/16/10   12/30/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-32           24,012                  12/16/10   12/30/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            3-02           16,275                  01/19/10   03/05/10    PERRAS EXCAVATING INC               
                                                            3-04           21,202                  02/01/10   08/12/11    PERRAS EXCAVATING INC               
                                                            3-05            9,993                  02/09/10   04/30/10    PERRAS EXCAVATING INC               
                                                            3-06            2,800                  03/05/10   04/23/10    PERRAS EXCAVATING INC               
                                                            3-07            8,449                  08/31/10   09/22/10    PERRAS EXCAVATING INC               
                                                            3-15            8,060                  03/29/11   04/22/11    PERRAS EXCAVATING INC               
                                                            3-16            8,314                  04/26/11   05/13/11    PERRAS EXCAVATING INC               
                                                            3-17            1,715                  05/05/11   05/25/11    PERRAS EXCAVATING INC               
                                                            3-18             -750                  06/06/11   06/10/11    PERRAS EXCAVATING INC               
                                                            4-01            2,018                  05/13/11   06/03/11    PERRAS EXCAVATING                   
                                                            4-02           32,973                  01/12/10   04/02/10    PERRAS EXCAVATING INC               
                                                            4-03           14,287                  02/09/10   04/30/10    PERRAS EXCAVATING INC               
                                                            4-04           10,409                  02/09/10   04/30/10    PERRAS EXCAVATING INC               
                                                            4-05           19,654                  03/05/10   04/23/10    PERRAS EXCAVATING INC               
                                                            4-06            4,639                  03/05/10   04/23/10    PERRAS EXCAVATING INC               
                                                            4-07            1,866                  03/05/10   04/23/10    PERRAS EXCAVATING INC               
                                                            4-08           18,910                  09/08/10   09/22/10    PERRAS EXCAVATING INC               
                                                            4-09           19,028                  09/08/10   09/22/10    PERRAS EXCAVATING INC               
                                                            5-01            8,306                  06/08/09   07/16/09    COLLINS-HAMMOND ELECTRICAL          
                                                            5-01              170                  05/13/11   06/03/11    COLLINS-HAMMOND ELECTRIC            
                                                            5-03           -1,999                  05/13/11   06/03/11    COLLINS-HAMMOND ELECTRIC            
                                                            5-04            3,550                  01/12/10   04/02/10    COLLINS-HAMMOND ELECTRICAL          
                                                            5-04           -4,742                  05/13/11   06/03/11    COLLINS-HAMMOND ELECTRIC            
                                                            5-05            1,450                  03/05/10   04/23/10    COLLINS-HAMMOND ELECTRICAL          
                                                            5-05           -1,318                  05/13/11   06/03/11    COLLINS-HAMMOND ELECTRIC            
                                                            5-08            7,796                  07/14/11   08/12/11    COLLINS-HAMMOND ELECTRICAL          
                                                            5-11            4,342                  07/14/11   08/12/11    COLLINS-HAMMOND ELECTRICAL          
                                                            5-12            7,513                  07/14/11   08/12/11    COLLINS-HAMMOND ELECTRICAL          
                                                            6-01            1,227                  07/28/09   08/06/09    ACTS II CONSTRUCTION                
                                                            6-02           -3,099                  05/13/11   06/03/11    ACTS II CONSTRUCTION                
                                                            7-01           29,800                  11/18/09   02/26/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            7-01           -3,132                  05/13/11   06/03/11    OP-TECH ENVIRONMENTAL               
                                                            7-02           14,312                  11/25/09   01/12/10    OP-TECH ENVIRONMENTAL               
                                                            7-02              -97                  05/13/11   06/03/11    OP-TECH ENVIRONMENTAL               
                                                            7-03            1,766                  05/13/11   06/03/11    OP-TECH ENVIRONMENTAL               
                                                            7-04             -198                  05/13/11     /  /      OP-TECH ENVIRONMENTAL               
                                                            FOM3-01        19,753                  05/13/11   06/03/11    PERRAS EXCAVATING INC               
 
07-0799   Reconstruction               0-001-007  11/15/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001               0                  01/22/08   04/15/08    Northern Mechanicals                
                                                            1-002          -2,000                  02/21/08   04/04/08    NORTHERN MECHANICALS, INC.          
 
12-0631   Reconstruction               0-001-008  11/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0303   Reconstruction               0-001-009  01/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E-002         -76,720                  05/09/13   12/04/13    S&L Electric, Inc.                  
                                                            E-007          19,015                  09/23/13   02/03/14    S&L Electric Inc.                   
                                                            E-008         -20,000                  09/23/13   12/04/13    S&L Electric, Inc.                  
                                                            E-009          45,044                  10/02/13   02/20/14    S&L Eletric Inc.                    
                                                            E-011          18,709                  10/24/13   02/20/14    S&L ELECTRIC INC                    
                                                            E-014           1,780                  02/28/14   07/03/14    S & L Electric Inc.                 
                                                            E-015           2,249                  02/28/14   07/03/14    S & L Electric Inc.                 
                                                            G-002          28,842                  07/19/13   07/29/13    Meridian Construction Corp          
                                                            G-003         -50,000                  08/22/13   09/13/13    Meridian Construction Corp          
                                                            G-003           1,107                  02/28/14   05/29/14    Continental Construction, LLC       
                                                            G-004          10,495                  09/23/13   11/25/13    Meridian Construction Corp          
                                                            G-006           1,804                  09/23/13   11/25/13    Meridian Construction Corp          
                                                            G-007          31,401                  10/24/13   02/07/14    MERIDIAN CONSTRUCTION CORP          
                                                            G-008         -85,500                  10/24/13   12/04/13    MERIDIAN CONSTRUCTION CORP          
                                                            G-009          11,101                  10/24/13   12/04/13    MERIDIAN CONSTRUCTION CORP          
                                                            G-010           1,901                  10/24/13   12/04/13    MERIDIAN CONSTRUCTION CORP          
                                                            G-011           2,029                  11/14/13   12/04/13    MERIDIAN CONSTRUCTION CORP          
                                                            G-012           4,682                  11/14/13   02/14/14    MERIDIAN CONSTRUCTION CORP          
                                                            G-013           2,271                  01/07/14   01/31/14    Meridian Construction Corp          
                                                            G-018          -1,079                  05/16/14   06/03/14    Meridian Construction Corp          
                                                            H-005           6,353                  07/19/13   07/26/13    Black River Plumbing, Heating, AC, I
                                                            H-006         -40,000                  08/22/13   08/29/13    Black River Plumbing, Heating, AC,  
                                                            H-007           1,683                  09/23/13   12/04/13    Black River Plumbing, Heating       
                                                            H-008             161                  09/23/13   12/04/13    Black River Plumbing, Heating       
                                                            H-009          13,336                  10/02/13   02/20/14    Black River Plumbing & Heating      
                                                            H-010             500                  10/02/13   10/16/13    Black River Plumbing & Heating      
                                                            H-011           1,151                  10/02/13   10/16/13    Black River Plumbing & Heating      
                                                            H-012           7,827                  10/02/13   02/20/14    Black River Plumbing & Heating      
                                                            H-013             525                  10/24/13   12/04/13    BLACK RIVER PLUMBING HEATING AC INC 
                                                            H-015           3,778                  11/14/13   02/14/14    BLACK RIVER PLUMB/HEAT/AC INC       
                                                            H-020             383                  07/07/14   01/27/14    Black River Plumbing and Heating    
                                                            H-021           4,932                  01/07/14   02/03/14    Black River Plumbing and Heating    
                                                            H-022          12,290                  02/28/14   05/29/14    Black River Plumbing, Heating, AC   
                                                            H-023           3,146                  03/28/14   05/29/14    Black River Plumbing, Heating, AC   
                                                            H-030           1,151                  05/16/14   06/03/14    Black River Plumbing, Heating, AC   
                                                            P-001           1,600                  05/09/13   07/16/13    Burns Bros Contractors, Inc.        
                                                            P-004         -15,000                  08/22/13   08/29/13    Burns Bros Contractors, Inc.        
                                                            P-005           1,865                  09/23/13   12/04/13    Burns Bros Contractors, Inc.        
                                                            P-006          17,221                  09/23/13   02/03/14    Burns Bros Contractors, Inc.        
                                                            P-007           1,457                  10/02/13   10/16/13    Burns Bros Contractors, Inc.        
                                                            P-008           1,332                  10/02/13   10/16/13    Burns Bros Contractors, Inc         
                                                            P-009           1,145                  10/02/13   10/16/13    Burns Bros Contractors, Inc         
                                                            P-010           2,675                  10/24/13   12/04/13    BURNS BROS CONTRACTORS INC          
                                                            P-012           2,857                  11/14/13   12/04/13    BURNS BROS CONTRACTORS INC          
                                                            P-013         -90,000                  01/07/14   02/03/14    Burns Bros Contractors, Inc.        
                                                            P-014             553                  01/07/14   01/27/14    Burns Bros Construction, Inc.       
                                                            P-017           4,438                  02/28/14   05/29/14    Burns Bros Contractors, Inc.        
                                                            P-020             577                  02/28/14   05/29/14    Burns Bros. Contractors, Inc.       
                                                            P-021           1,239                  05/16/14   06/03/14    Burns Bros Contractors, Inc.        
                                                            P-023           1,943                  07/25/14   10/28/14    Burns Bros. Contractors, Inc.       
 
12-1117   Reconstruction               0-001-010  06/06/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1681   Reconstruction               0-001-011  04/10/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1996   Reconstruction               0-001-012  08/27/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AASC-02             0                  12/20/19   01/14/20    CON TECH BUILDING SYSTEMS           
                                                            AASC-03             0                  12/20/19   01/14/20    CON TECH BUILDING SYSTEMS           
                                                            AASC-04             0                  12/20/19   01/14/20    CON TECH BUILDING SYSTEMS           
                                                            AASC-06             0                  12/20/19   01/14/20    CON TECH BUILDING SYSTEMS           
                                                            AASC-07             0                  12/20/19   01/14/20    CON TECH BUILDING SYSTEMS           
                                                            EC-01          -8,732                  01/15/20   02/05/20    PERRAS CONSTRUCTION SERVICES        
                                                            GC-02         -12,311                  12/20/19   01/14/20    CONTINENTAL CONSTRUCTION, LLC       
                                                            SC-01               0                  07/22/19   10/03/19    CON TECH BUILDING SYSTEMS           
                                                            SC-03         -71,030                  11/29/19   01/16/20    CON TECH BUILDING SYSTEMS           
 
18-1584   Additions and Alterations    0-001-013  07/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-02             0                  06/30/20   07/28/20    DOW ELECTRIC                        
                                                            AAEC-04             0                  06/30/20   07/28/20    DOW ELECTRIC                        
                                                            AAEC-06             0                  09/24/20   11/09/20    DOW ELECTRIC                        
                                                            AAEC-07             0                  02/26/21   04/15/21    DOW ELECTRIC                        
                                                            AAEC-08             0                  10/07/20   12/03/20    DOW ELECTRIC                        
                                                            AAEC-09             0                  10/07/20   12/03/20    DOW ELECTRIC                        
                                                            AAEC-11             0                  11/23/20   02/05/21    DOW ELECTRIC                        
                                                            AAEC-12             0                  11/23/20   02/05/21    DOW ELECTRIC                        
                                                            AAEC-14             0                  11/24/20   02/05/21    DOW ELECTRIC                        
                                                            AAEC-15             0                  03/11/21   05/04/21    DOW ELECTRIC                        
                                                            AAEC1202            0                  11/24/20   02/05/21    DOW ELECTRIC                        
                                                            AAGC-03             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-13             0                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            AAGC-14             0                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            AAGC-19             0                  09/24/20   11/27/20    BETTE & CRING, LLC                  
                                                            AAGC-21             0                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            AAGC-22             0                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            AAGC1204            0                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            AAGC1205            0                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            AAMC-03             0                  12/18/20   03/08/21    NORTHERN MECHANICAL                 
                                                            AAMC-05             0                  12/18/20   03/08/21    NORTHERN MECHANICAL                 
                                                            AAMC-06             0                  02/01/21   03/25/21    NORTHERN MECHANICAL                 
                                                            AAMC-07             0                  02/01/21   03/25/21    NORTHERN MECHANICAL                 
                                                            AAPC-04             0                  11/23/20   02/05/21    BURNS BROS CONTRACTORS              
                                                            AAPC-04             0                  11/24/20   02/05/21    BURNS BROS CONTRACTORS              
                                                            AAPC-05             0                  11/23/20   02/05/21    BURNS BROS CONTRACTORS              
                                                            AAPC-06             0                  02/01/21   03/25/21    BURNS BROS. CONTRACTORS             
                                                            AAPC1201            0                  03/19/21   05/20/21    BURNS BROS. CONTRACTORS             
                                                            AASC-03             0                  09/24/20   11/25/20    BARRETT PAVING MATERIAL, INC.       
                                                            AASC-04             0                  02/26/21   04/20/21    BARRETT PAVING MATERIAL, INC.       
                                                            AASC-08             0                  10/07/20   12/09/20    BARRETT PAVING MATERIAL, INC.       
                                                            EC-02          24,713                  11/24/20   02/05/21    DOW ELECTRIC                        
                                                            EC-03           5,444                  03/11/21   05/04/21    DOW ELECTRIC                        
                                                            EC-05          19,246                  03/19/21   05/20/21    DOW ELECTRIC                        
                                                            EC-07           8,140                  03/19/21   05/20/21    DOW ELECTRIC                        
                                                            EC-09          -1,173                  04/08/21   05/05/21    DOW ELECTRIC                        
                                                            GC-01            -598                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            GC-02          -5,848                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            GC-06          13,068                  10/14/20   12/30/20    BETTE & CRING, LLC                  
                                                            GC-10          45,000                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            GC-11           3,723                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            GC-12            -389                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            GC-16           5,723                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            GC-17             374                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            GC-19           9,885                  11/24/20   01/29/21    BETTE & CRING, LLC                  
                                                            GC-21           1,957                  11/23/20   01/29/21    BETTE & CRING, LLC                  
                                                            GC-22           4,167                  11/24/20   01/29/21    BETTE & CRING, LLC                  
                                                            GC-23           4,584                  11/24/20   01/29/21    BETTE & CRING, LLC                  
                                                            GC-24           1,305                  02/01/21   03/19/21    BETTE & CRING, LLC                  
                                                            GC-25           2,719                  02/01/21   03/19/21    BETTE & CRING, LLC                  
                                                            GC-26           5,537                  02/16/21   04/15/21    BETTE & CRING, LLC                  
                                                            GC-28          34,978                  02/23/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-29          12,800                  02/23/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-30             835                  03/11/21   05/04/21    BETTE & CRING, LLC                  
                                                            MC-01          -3,978                  07/17/20   08/26/20    NORTHERN MECHANICAL                 
                                                            MC-03          -8,354                  12/18/20   03/08/21    NORTHERN MECHANICAL                 
                                                            MC-04         -17,594                  03/11/21   05/04/21    NORTHERN MECHANICAL                 
                                                            MC-05         -20,000                  03/11/21   05/04/21    NORTHERN MECHANICAL                 
                                                            PC-02          -2,079                  06/30/20   07/28/20    BURNS BROS CONTRACTORS              
                                                            PC-04          27,256                  04/08/21   05/05/21    BURNS BROS. CONTRACTORS             
                                                            PC-05          27,256                  04/08/21   05/05/21    BURNS BROS. CONTRACTORS             
                                                            PC-07         -11,003                  05/14/21   08/16/21    BURNS BROS. CONTRACTORS             
                                                            SC-01          -3,045                  09/24/20   11/25/20    BARRETT PAVING MATERIAL, INC.       
                                                            SC-02         -44,716                  11/24/20   01/29/21    BARRETT PAVING MATERIAL, INC.       
                                                            SC-03         -20,000                  11/24/20   01/29/21    BARRETT PAVING MATERIAL, INC.       
 
23-0295   Reconstruction               0-001-015  10/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary School:
96-0786   Reconstruction               0-005-002  03/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1296   Reconstruction               0-005-003  05/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0454   Additions and Alterations    0-005-004  05/05/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1-001        -112,997                  09/29/04   10/14/04    Bette & Cring                       
                                                            1-007          30,400                  06/21/06   08/09/06    Bette Cring                         
                                                            1-011          46,853                  11/01/06   12/18/06    Bette Cring                         
                                                            1-012           6,930                  11/15/06   01/09/07    Bette Cring                         
                                                            1-015           7,575                  03/29/07   04/03/07    Bette Cring                         
                                                            1-017           8,445                  04/26/07   05/15/07    Bette Cring                         
                                                            3-007           3,322                  03/14/07   04/13/09    Northern Mechanical                 
                                                            3-007           3,322                  10/22/08     /  /      NORTHERN MECHANICAL                 
                                                            3-008          29,000                  03/29/07   04/13/09    Northern Mechanical                 
                                                            3-008          29,000                  10/22/08     /  /      NORTHERN MECHANICAL                 
                                                            3-009           1,577                  07/20/07   10/28/07    Northern mechanicals                
                                                            4-002           8,958                  12/20/06   01/09/07    Norwood Plumbing                    
                                                            5-006          10,055                  05/02/06     /  /      Collins Hammond electrical          
                                                            5-006          10,055                  10/22/08   04/13/09    COLLINS - HAMMOND ELECTRICAL, INC.  
                                                            5-007           2,013                  06/07/07   10/22/07    Collins Hammond Electrical          
                                                            5-008           3,305                  06/07/07   05/12/09    Collins Hammond Electrical          
                                                            5-008           3,305                  10/22/08     /  /      COLLINS - HAMMOND ELECTRICAL, INC.  
                                                            5-011           1,960                  03/14/07   10/23/07    Collins Hammond Electrical          
                                                            6-006          13,699                  12/15/06   01/30/07    AAC Contracting                     
                                                            7-001         -20,226                  11/15/06   01/09/07    Gouverneur Roofing                  
 
07-1689   Reconstruction               0-005-005  10/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -11,574                  08/11/09   09/02/09    PTL CONTRACTING CORPORATION         
                                                            2-04            8,765                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-05           16,673                  09/17/09     /  /      HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-06           21,769                  09/17/09   09/24/09    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-06           -2,577                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-13            2,623                  12/16/09   01/21/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-14            2,472                  01/12/10   04/02/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-16            1,051                  01/12/10   04/02/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-18              676                  02/05/10   09/13/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-24           12,791                  03/22/10   06/14/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-25            4,328                  04/02/10   06/09/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-27            2,073                  04/05/10   06/09/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            3-01           -9,496                  05/13/11   06/03/11    PERRAS EXCAVATING INC               
                                                            3-03            5,185                  02/09/10   08/12/11    PERRAS EXCAVATING INC               
                                                            3-08           14,897                  08/31/10   09/22/10    PERRAS EXCAVATING INC               
                                                            3-09            7,123                  02/25/11   03/18/11    PERRAS EXCAVATING INC               
                                                            3-10           29,500                  03/09/11   05/25/11    PERRAS EXCAVATING INC               
                                                            3-11           15,600                  03/09/11   05/25/11    PERRAS EXCAVATING INC               
                                                            3-12           15,600                  03/17/11   09/19/11    PERRAS EXCAVATING INC               
                                                            3-13            5,500                  03/17/11   08/12/11    PERRAS EXCAVATING INC               
                                                            3-14           10,500                  03/17/11   08/12/11    PERRAS EXCAVATING INC               
                                                            4-01            6,400                  03/05/10   04/23/10    PERRAS EXCAVATING INC               
                                                            5-02              546                  06/08/09   07/16/09    COLLINS-HAMMOND ELECTRICAL          
                                                            5-03              556                  01/12/10   04/02/10    COLLINS-HAMMOND ELECTRICAL          
                                                            5-06            2,330                  03/05/10   04/23/10    COLLINS-HAMMOND ELECTRICAL          
                                                            5-07            1,570                  09/21/10   11/18/10    COLLINS-HAMMOND ELECTRICAL          
                                                            5-09            3,620                  07/14/11   08/12/11    COLLINS-HAMMOND ELECTRICAL          
                                                            6-01           16,900                  05/13/11   06/03/11    ACTS II CONSTRUCTION                
                                                            7-03            1,155                  11/25/09   01/12/10    OP-TECH ENVIRONMENTAL               
                                                            7-04            9,436                  03/30/10   05/28/10    OP-TECH ENVIRONMENTAL               
 
12-0304   Reconstruction               0-005-006  01/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-001        -129,890                  05/09/13   12/04/13    S&L Electric, Inc.                  
                                                            E-005          -1,488                  08/05/13   08/08/13    S&L Electric Inc.                   
                                                            E-006          -5,196                  08/05/13   01/27/14    S&L Electric Inc.                   
                                                            E-012E-0       27,944                  01/07/14   02/03/14    S & L Electric Inc.                 
                                                            G-001         -91,000                  05/09/13   11/22/13    Meridian Construction Corp          
                                                            G-005          37,605                  10/02/13   11/25/13    Meridian Construction Corp          
                                                            G-014           1,027                  02/28/14   05/29/14    Meridian Construction Corp          
                                                            G-015           3,132                  02/28/14   05/29/14    Meridian Construction Corp          
                                                            H-001         -59,795                  05/09/13   12/04/13    Black River Plumbing, Heating, AC   
                                                            H-002           4,215                  08/05/13   01/27/14    Black River Plumbing, Heating,AC, In
                                                            H-003             500                  08/05/13   08/08/13    Black River Plumbing, Heating,AC, In
                                                            H-004             317                  07/19/13   07/26/13    Black River Plumbing, Heating, AC,In
                                                            H-017             612                  01/07/14   01/27/14    Black River Plumbing, Heating       
                                                            H-024           1,257                  02/28/14   05/29/14    Black River Plumbing, Heating, AC   
                                                            H-025           2,676                  02/28/14   05/29/14    Black River Plumbing, Heating, AC   
                                                            H-026          -8,209                  02/28/14   05/29/14    Black River Plumbing, Heating, AC   
                                                            H-027          13,442                  02/28/14   05/29/14    Black River Plumbing, Heating, AC   
                                                            H-028           3,507                  05/16/14   06/03/14    Black River Plumbing, Heating, AC   
                                                            H-029          18,939                  05/16/14   06/03/14    Black River Plumbing, Heating, AC   
                                                            P-002           6,200                  05/09/13   12/04/13    Burns Bros Contractors, Inc.        
                                                            P-003             876                  07/19/13   07/26/13    Burns Bros Contractors, Inc.        
                                                            P-011             526                  11/14/13   12/04/13    BURNS BROS CONTRACTORS INC          
                                                            P-016          -2,000                  01/07/14   06/09/14    Burns Bros Construction, Inc.       
                                                            P-018           4,438                  02/28/14   05/29/14    Burns Bros. Contractors, Inc.       
                                                            P-019           1,141                  02/28/14   05/29/14    Burns Bros. Contractors, Inc.       
 
12-1118   Reconstruction               0-005-007  06/06/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           3,322                  05/15/14   06/30/14    S&L Electric, Inc.                  
                                                            E-002             724                  05/15/14   06/30/14    S&L Electric, Inc.                  
                                                            E-003           2,425                  09/11/14   09/12/14    S&L Electric Inc.                   
                                                            E-004             894                  09/02/14   09/08/14    S&L Electric Inc                    
                                                            E-005         -10,000                  02/26/15     /  /      S & L Electric Inc.                 
                                                            G-001          -7,928                  10/24/13   11/15/13    CONTINENTAL CONSTRUCTION LLC        
                                                            G-002           1,556                  01/07/14   01/31/14    Continental Construction, LLC       
                                                            G-004         -10,000                  05/15/14   06/30/14    Continental Construction, LLC       
 
14-1682   Reconstruction               0-005-008  04/10/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-001           3,087                  01/08/16   01/21/16    BURNS BROS CONTRACTORS,INC.         
                                                            P-002           2,339                  02/18/16     /  /      Burns Bros Contractors, Inc.        
 
17-0358   Reconstruction               0-005-009  04/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  12/21/18   06/06/19    ENI MECHANICAL, INC.                
                                                            EC-02          -1,338                  12/21/18   06/06/19    ENI MECHANICAL, INC                 
                                                            HVAC-01        -2,000                  01/29/19   06/06/19    NORTHERN MECHANICALS, INC.          
 
17-1997   Reconstruction               0-005-010  08/27/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          42,739                  01/24/20   02/28/20    BURNS BROS. CONTRACTORS             
 
18-1585   Reconstruction               0-005-011  07/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-01             0                  06/30/20   07/28/20    DOW ELECTRIC                        
                                                            AAEC-03             0                  06/30/20   07/28/20    DOW ELECTRIC                        
                                                            AAEC-05             0                  07/17/20   08/26/20    DOW ELECTRIC                        
                                                            AAEC-10             0                  10/07/20   12/03/20    DOW ELECTRIC                        
                                                            AAEC-13             0                  11/23/20   02/05/21    DOW ELECTRIC                        
                                                            AAEC1201            0                  11/24/20   02/05/21    DOW ELECTRIC                        
                                                            AAGC-01             0                  06/30/20   07/27/20    BETTE & CRING, LLC                  
                                                            AAGC-02             0                  06/30/20   07/27/20    BETTE & CRING, LLC                  
                                                            AAGC-04             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-05             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-06             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-07             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-08             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-09             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-10             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-11             0                  07/13/20   08/24/20    BETTE & CRING, LLC                  
                                                            AAGC-12             0                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            AAGC-15             0                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            AAGC-16             0                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            AAGC-17             0                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            AAGC-18             0                  07/17/20   09/10/20    BETTE & CRING, LLC                  
                                                            AAGC-20             0                  09/24/20   11/27/20    BETTE & CRING, LLC                  
                                                            AAGC-23             0                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            AAGC-24             0                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            AAGC1201            0                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            AAGC1202            0                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            AAGC1203            0                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            AAMC-01             0                  10/07/20   12/03/20    NORTHERN MECHANICAL                 
                                                            AAMC-02             0                  10/07/20   12/03/20    NORTHERN MECHANICAL                 
                                                            AAMC-04             0                  12/18/20   03/08/21    NORTHERN MECHANICAL                 
                                                            AAPC-01             0                  07/17/20   08/26/20    BURNS BROS CONTRACTORS              
                                                            AAPC-02             0                  07/17/20   08/26/20    BURNS BROS CONTRACTORS              
                                                            AAPC-03             0                  10/07/20   12/03/20    BURNS BROS CONTRACTORS              
                                                            AAPC-07             0                  03/19/21   05/20/21    BURNS BROS. CONTRACTORS             
                                                            AASC-06             0                  02/26/21   04/20/21    BARRETT PAVING MATERIAL, INC.       
                                                            AASC-07             0                  02/26/21   04/20/21    BARRETT PAVING MATERIAL, INC.       
                                                            AASC-09             0                  11/24/20   02/19/21    BARRETT PAVING MATERIAL, INC.       
                                                            EC-01          24,713                  11/24/20   02/05/21    DOW ELECTRIC                        
                                                            EC-04             322                  04/08/21   05/05/21    DOW ELECTRIC                        
                                                            EC-06           7,425                  03/19/21   05/20/21    DOW ELECTRIC                        
                                                            EC-08           9,578                  03/19/21   05/20/21    DOW ELECTRIC                        
                                                            GC-03          14,984                  10/14/20   12/30/20    BETTE & CRING, LLC                  
                                                            GC-04           7,927                  10/14/20   12/30/20    BETTE & CRING, LLC                  
                                                            GC-05          12,733                  10/14/20   12/30/20    BETTE & CRING, LLC                  
                                                            GC-08          18,593                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            GC-09          10,007                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            GC-13            -328                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            GC-14           7,858                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            GC-15          19,969                  10/07/20   12/09/20    BETTE & CRING, LLC                  
                                                            GC-18             291                  11/24/20   02/19/21    BETTE & CRING, LLC                  
                                                            GC-20           1,968                  11/24/20   02/19/21    BETTE & CRING, LLC                  
                                                            GC-27          14,641                  02/23/21   04/19/21    BETTE & CRING, LLC                  
                                                            PC-01          -1,943                  06/30/20   07/28/20    BURNS BROS CONTRACTORS              
                                                            PC-06          17,296                  04/08/21   05/05/21    BURNS BROS. CONTRACTORS             
 
21-0062   Reconstruction               0-005-012  08/11/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -23,314                  02/17/22   02/16/23    Continental Const LLC               
                                                            GC-02          -4,000                  06/13/22   03/30/23    Continental Const LLC               
 
22-0310   Reconstruction               0-005-013  10/14/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  06/22/23   12/22/23    NORTHERN TIER CONTRACTING           
                                                            GC-02             -87                  06/26/23   12/22/23    NORTHERN TIER CONTRACTING           
 
22-0061   Reconstruction               0-005-014  06/14/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
96-0788   Reconstruction               5-002-002  03/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1297   Reconstruction               5-002-003  05/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0455   Reconstruction               5-002-004  05/05/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-009          14,800                  08/29/06   10/13/06    Bette Cring                         
 
07-1690   Reconstruction               5-002-005  10/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-30           76,153                  09/21/10   11/18/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-33            1,089                  04/22/11   05/13/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-34           23,188                  06/06/11   06/10/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            3-01           11,248                  01/19/10   03/05/10    PERRAS EXCAVATING INC               
                                                            4-02            3,982                  05/13/11   06/03/11    PERRAS EXCAVATING INC               
                                                            4-10            3,730                  03/09/11   05/25/11    PERRAS EXCAVATING INC               
                                                            5-02           -1,770                  05/13/11   06/03/11    COLLINS-HAMMOND ELECTRIC            
                                                            5-10            4,186                  07/14/11   08/12/11    COLLINS-HAMMOND ELECTRICAL          
                                                            7-05            1,587                  03/30/10   05/28/10    OP-TECH ENVIRONMENTAL               
 
12-0305   Reconstruction               5-002-006  01/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-003         -75,120                  05/09/13   12/04/13    S&L Electric, Inc.                  
                                                            E-004         -26,450                  10/24/13   03/06/14    S&L ELECTRIC INC                    
                                                            E-010           1,551                  11/14/13   12/04/13    S&L ELECTRIC INC                    
                                                            E-013           2,200                  01/07/14   01/27/14    S & L Electric Inc.                 
                                                            E-016          35,000                  11/19/14   11/24/14    S&L Electric Inc.                   
                                                            G-016           2,500                  05/16/14   06/03/14    Meridian Construction Corp          
                                                            G-017           2,500                  05/16/14   06/03/14    Meridian Construction Corp          
                                                            H-014             266                  11/14/13   12/04/13    BLACK RIVER PLUMB/HEAT/AC INC       
                                                            H-016           1,561                  01/07/14   01/27/14    Black River Plumbing, Heating       
                                                            H-018           2,163                  01/07/14   01/27/14    Black River Plumbing, Heating       
                                                            H-019           3,479                  01/07/14   02/03/14    Black River Plumbing and Heating    
                                                            P-015          -2,000                  01/07/14   01/27/14    Burns Bros Contractors, Inc.        
                                                            P-022             790                  05/16/14   06/03/14    Burns Bros Contractors, Inc.        
 
17-1998   Reconstruction               5-002-008  08/27/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1586   Reconstruction               5-002-009  07/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AASC-01             0                  09/24/20   11/25/20    BARRETT PAVING MATERIAL, INC.       
                                                            AASC-02             0                  09/24/20   11/25/20    BARRETT PAVING MATERIAL, INC.       
                                                            AASC-05             0                  02/26/21   04/20/21    BARRETT PAVING MATERIAL, INC.       
                                                            GC-07         -11,566                  09/24/20   11/25/20    BETTE & CRING, LLC                  
                                                            PC-03          -5,535                  07/17/20   08/26/20    BURNS BROS CONTRACTORS              
 
20-0192   Reconstruction               5-002-010  10/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          23,358                  06/16/21   03/22/22    L&O Plumbing                        
 

          Press Box:
18-0239   New Construction             7-007-001  08/27/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
18-0291   Reconstruction               7-999-001  10/24/18  NO CHANGE ORDERS ON ELECTRONIC FILE

CANTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-02-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXHugh C. Williams High School:
90-1705   Reconstruction               0-002-004  07/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0029   Reconstruction               0-002-005  07/15/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1125   Reconstruction               0-002-006  04/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0924   Reconstruction               0-002-009  04/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXFrances J. Banford Elem.:
91-1405   Reconstruction               0-009-004  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1126   Reconstruction               0-009-005  04/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Canton Cent. Sch(PK-12)was 002&009:
92-1127   Reconstruction               0-010-005  04/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0691   Additions and Alterations    0-010-006  04/10/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2181   Reconstruction               0-010-007  05/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1           -12,120                  10/02/03   11/26/03    Murnane Building Contractors        
 
06-1325   Reconstruction               0-010-008  06/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01             -654                  09/25/08   01/30/09    RSI ROOFING, INC.                   
                                                            1-02                0                  09/19/08   01/29/09    RSI ROOFING, INC.                   
                                                            1-03          -38,056                  11/12/08   05/15/09    RSI ROOFING, INC.                   
 
07-1714   Reconstruction               0-010-009  05/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01                0                  10/08/08   11/06/08    MURNANE BUILDING CONTRACTORS        
                                                            1-02           28,534                  10/08/08   11/06/08    MURNANE BUILDING CONTRACTORS        
                                                            1-03            8,900                  10/08/08   11/06/08    MURNANE BUILDING CONTRACTORS        
                                                            1-04           -5,788                  10/08/08   11/06/08    MURNANE BUILDING CONTRACTORS        
                                                            1-05           -9,552                  11/12/08   01/12/09    MURNANE BUILDING CONTRACTORS        
                                                            1-06           11,217                  03/24/09   07/23/09    MURNANE BUILDING CONTRACTORS        
 
11-1138   Reconstruction               0-010-010  05/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            101-001             0                  10/02/13   11/15/13    Bette & Cring, Inc.                 
                                                            101-002             0                  10/02/13   10/24/13    Bette & Cring LLC                   
                                                            101-004             0                  05/06/13   04/08/14    Bette & Cring LLC                   
                                                            101-007         8,479                  05/06/13   04/08/14    Bette & Cring LLC                   
                                                            101-009             0                  05/06/13   07/03/13    Bette & Cring LLC                   
                                                            101-010             0                  10/02/13   10/24/13    Bette & Cring LLC                   
                                                            101-011        52,110                  10/02/13   10/24/13    Bette & Cring LLC                   
                                                            101-013         2,246                  10/24/13   11/18/13    BETTE & CRING LLC                   
                                                            101-014        19,113                  10/24/13   11/18/13    BETTE & CRING LLC                   
                                                            101-015             0                  10/30/13   11/18/13    Bette & Cring LLC                   
                                                            101-016           896                  11/27/13   12/24/13    BETTE & CRING LLC                   
                                                            101-017         5,750                  11/27/13   12/24/13    BETTE & CRING LLC                   
                                                            101-018         8,301                  05/28/14   06/24/14    Bette & Cring, LLC                  
                                                            101-019         4,284                  05/28/14   06/24/14    Bette & Cring, LLC                  
                                                            101-021         2,069                  05/28/14   06/24/14    Bette & Cring, LLC                  
                                                            101-022        -3,729                  06/19/14   07/07/14    BETTE & CRING LLC                   
                                                            101-022        -3,729                  06/05/14   06/24/14    Bette & Cring, LLC                  
                                                            101-023        -1,520                  06/19/14     /  /      BETTE & CRING LLC                   
                                                            101-023        -1,520                  06/06/14   07/07/14    Bette & Cring, LLC                  
                                                            102-001        27,647                  10/02/13   02/12/14    Northern Mechanicals, Inc.          
                                                            102-002        38,525                  10/02/13   02/12/14    Northern Mechanicals, Inc.          
                                                            102-003        14,840                  10/24/13   02/13/14    NORTHERN MECHANICALS INC            
                                                            102-004             0                  11/27/13   02/12/14    NORTHERN MECHANICALS,INC            
                                                            102-005        30,135                  10/02/13   02/12/14    Northern Mechanicals, Inc.          
                                                            102-006       -12,774                  11/27/13   02/12/14    L. THOMAS HOPSICKER                 
                                                            102-007        10,979                  05/28/14   06/25/14    Northern Mechanicals, Inc.          
                                                            102-008         9,021                  06/19/14   07/07/14    NORTHERN MECHANICALS                
                                                            102-008         9,021                  06/05/14   06/24/14    Northern Mechanicals                
                                                            102-009         7,389                  06/19/14   06/24/14    NORTHERN MECHANICALS INC            
                                                            102-009         7,389                  06/05/14   07/07/14    Northern Mechanicals, Inc.          
                                                            103-001             0                  10/02/13   02/12/14    Norwood Plumbing Inc.               
                                                            103-003             0                  12/09/13   02/10/14    Norwood Plumbing, Inc.              
                                                            103-004             0                  12/09/13   01/27/14    Norwood Plumbing, Inc.              
                                                            103-005         1,777                  05/28/14   06/25/14    Norwood Plumbing, Inc.              
                                                            103-006         3,257                  05/28/14   06/24/14    Norwood Plumbing, Inc.              
                                                            104-002             0                  10/02/13     /  /      Dow Electric, Inc.                  
                                                            104-002             0                  10/02/13   02/12/14    Dow Electric, Inc.                  
                                                            104-003             0                  10/02/13   02/14/14    Dow Electric, Inc.                  
                                                            104-004             0                  06/06/14   07/07/14    Dow Electric, Inc.                  
                                                            104-005             0                  05/28/14   06/24/14    Dow Electric, Inc.                  
                                                            104-006             0                  06/06/14   07/07/14    Dow Electric, Inc.                  
                                                            104-007         4,395                  06/06/14   07/03/14    DOW ELECTRIC INC                    
 
11-0852   Reconstruction               0-010-011  04/05/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            100-001             0                  05/30/13   07/15/13    Fibertech Envirobmental Services, In
                                                            100-002       -13,628                  05/30/13   07/23/13    Fibertech Envirobmental Services, In
                                                            100-003         1,850                  07/12/13   07/23/13    Fibertech Environmental Services, In
                                                            HV-001        -58,397                  05/29/13   06/30/14    Merit Plumbing and Heating, LLC     
 
12-0268   Reconstruction               0-010-012  04/03/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            201-001             0                  10/24/13   11/15/13    LORAN CONSTRUCTION INC              
                                                            201-002             0                  10/24/13   11/15/13    LORAN CONSTRUCTION INC              
                                                            201-003             0                  10/24/13   11/15/13    LORAN CONSTRUCTION INC              
                                                            201-004             0                  10/24/13   11/15/13    LORAN CONSTRUCTION INC              
                                                            201-005         6,077                  05/28/14   06/30/14    Loran Construction, Inc.            
                                                            201-006       -16,712                  06/05/14   07/03/14    Loran Construction, Inc.            
                                                            201-007             0                  05/28/14   06/30/14    Loran Construction, Inc.            
                                                            201-008         4,959                  12/29/14   01/07/15    Loran Construction, Inc.            
                                                            201-008        -4,959                  01/15/15   01/22/15    Loran Construction, Inc.            
                                                            201-009         7,529                  12/29/14   01/07/15    Loran Construction, Inc.            
                                                            201-009         7,529                  01/15/15   01/22/15    Loran Construction, Inc.            
                                                            201-010       -25,134                  05/28/14   06/30/14    Loran Construction, Inc.            
                                                            201-011         5,531                  06/24/14   09/02/14    Loran Construction, Inc.            
                                                            201-012        13,622                  05/28/14   06/30/14    Loran Construction, Inc.            
                                                            201-013        -8,194                  05/28/14   06/30/14    Loran Construction, Inc.            
                                                            201-014        24,857                  06/24/14   09/02/14    Loran Construction, Inc.            
                                                            201-015        -1,604                  05/28/14   06/30/14    Loran Construction, Inc.            
                                                            201-016         3,665                  05/28/14   06/30/14    Loran Construction, Inc.            
                                                            201-017         2,700                  06/05/14   07/03/14    Loran Construction, Inc.            
                                                            201-018         7,996                  06/05/14   07/03/14    Loran Construction, Inc.            
                                                            201-019        -9,309                  06/05/14   07/03/14    Loran Construction, Inc.            
                                                            201-020        27,259                  06/24/14   09/02/14    Loran Construction, Inc.            
                                                            201-021        46,955                  10/23/14   10/24/14    Loran Construction, Inc.            
                                                            201-022        12,282                  10/23/14   10/24/14    Loran Construction, Inc.            
                                                            201-023         2,896                  10/23/14   10/24/14    Loran Construction, Inc.            
                                                            201-024           400                  10/24/14   11/06/14    Loran Construction, Inc.            
                                                            202-001       -16,012                  06/05/14   07/03/14    Northern Mechanicals                
                                                            202-002             0                  06/05/14   07/03/14    Northern Mechanicals                
                                                            202-003             0                  06/05/14   07/03/14    Northern Mechanicals                
                                                            202-004             0                  06/24/14   09/02/14    Northern Mechanicals, Inc.          
                                                            202-005         8,116                  06/05/14   07/03/14    Northern Mechanicals, Inc.          
                                                            202-006         3,174                  10/23/14     /  /      Norhtern Mechanicals, Inc.          
                                                            202-007        18,022                  10/23/14     /  /      Northern Mechanicals Inc.           
                                                            202-008        68,870                  10/23/14   10/24/14    Northern Mechanicals, Inc.          
                                                            202-009         6,141                  10/23/14   10/24/14    Northern Mechanicals, Inc.          
                                                            202-010        72,172                  10/24/14   11/06/14    Northern Mechanicals, Inc.          
                                                            203-001         1,738                  12/05/14   12/11/14    Skelly Contractors, Inc.            
                                                            203-002        15,000                  12/05/14   12/11/14    Skelly Contractors, Inc.            
                                                            203-003         1,107                  12/05/14   12/11/14    Skelly Contractors, Inc.            
                                                            204-001             0                  10/24/13   02/14/14    DOW ELECTRIC                        
                                                            204-002        -6,800                  06/05/14   07/03/14    Dow Electric, Inc.                  
                                                            204-003             0                  06/05/14   07/03/14    Dow Electric, Inc.                  
                                                            204-004         7,001                  06/05/14   07/03/14    Dow Electric, Inc.                  
                                                            204-005         6,369                  06/05/14   07/03/14    Dow Electric, Inc.                  
                                                            204-006         3,837                  06/06/14   07/03/14    Dow Electric, Inc.                  
                                                            204-007           350                  06/24/14   09/02/14    Dow Electric, Inc.                  
                                                            204-008         2,570                  10/23/14   10/24/14    Dow Electric, Inc.                  
                                                            204-009        13,354                  10/23/14   10/24/14    Dow Electric, Inc.                  
                                                            204-010         5,525                  10/23/14   10/24/14    Dow Electric, Inc.                  
                                                            204-011           646                  10/23/14   10/24/14    Dow Electric, Inc.                  
 
15-0422   Reconstruction               0-010-013  06/16/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01          32,822                  08/25/17   09/06/17    S & L Electric Inc.                 
                                                            EC-02          26,848                  02/21/18   03/28/18    S&L Electric Inc.                   
                                                            EC-03           3,609                  03/26/18   03/28/18    S&L Electric Inc.                   
                                                            EC-04           1,042                  03/26/18   03/28/18    S&L Electric Inc.                   
                                                            EC-05           4,085                  05/07/18   05/16/18    S&L ELECTRIC INC.                   
                                                            GC-01          -2,156                  08/25/17   09/06/17    Murnane Building Contractors        
                                                            GC-02           4,179                  08/25/17   09/06/17    Murnane Building Contractors        
                                                            GC-03           1,201                  11/15/17   12/04/17    Murnane Building Contractors        
                                                            GC-04           5,970                  02/21/18   03/23/18    Murnane Building Contractors        
                                                            GC-05          37,633                  03/26/18   04/05/18    Murnane Building Contractors        
                                                            GC-06           8,643                  05/07/18   05/14/18    Murnane Building Contractors        
                                                            MC-01          10,075                  05/07/18   05/16/18    NORTHERN MECHANICALS INC.           
                                                            PC-01          15,620                  10/31/17   11/16/17    Norwood Plumbing                    
                                                            PC-02          -3,785                  03/26/18     /  /      Norwood Plumbing                    
                                                            SC-06           3,329                  05/07/18   05/14/18    TJ Fiacco Construction LLC          
 
15-0853   Reconstruction               0-010-014  06/16/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01          22,050                  05/03/18   06/04/18    TJ Fiacco Construction LLC          
                                                            SC-02          40,000                  05/03/18   06/04/18    TJ Fiacco Construction LLC          
                                                            SC-03         107,544                  05/03/18   10/24/18    TJ Fiacco Construction LLC          
                                                            SC-04          55,230                  05/07/18   05/31/18    TJ Fiacco Construction LLC          
                                                            SC-06           3,329                  05/21/18   06/04/18    TJ Fiacco Construction LLC          
                                                            SC-07          23,579                  05/21/18   06/04/18    TJ Fiacco Construction LLC          
                                                            SC-08          44,205                  05/21/18   06/04/18    TJ Fiacco Construction LLC          
 
17-0356   Reconstruction               0-010-015  01/02/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         26,839                  05/07/18   05/31/18    WHITTON CONSTRUCTION LLC            
                                                            GC-002          4,213                  05/18/18   05/31/18    WHITTON CONSTRUCTION LLC            
 
18-0008   Reconstruction               0-010-018  07/27/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-10102       12,496                  02/15/19   02/25/19    BARKLEY'S SAFE AND LOCK CO          
                                                            GC101-01       34,736                  02/27/19   03/13/19    BARKLEY'S SAFE AND LOCK CO.         
                                                            GC101-03        8,691                  05/28/19   05/30/19    BARKLEY'S SAFE AND LOCK CO.         
                                                            GC102-01        7,887                  12/13/18   01/15/19    NEW ENGLAND SECURITY FILM, LLC      
                                                            GC102-02        2,413                  05/28/19   05/30/19    NEW ENGLAND SECURITY FILM, LLC      
 
18-2005   Reconstruction               0-010-019  06/17/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0189   Reconstruction               0-010-020  09/19/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1800   Reconstruction               0-010-021  07/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,000                  02/02/22   12/01/22    Whitton Const LLC                   
 
20-1056   Reconstruction               0-010-022  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1173   Reconstruction               0-010-023  01/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1812   Reconstruction               0-010-024  11/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  06/07/23   01/02/24    WATSON ELECTRIC                     
                                                            EC-02               0                  06/07/23   01/02/24    WATSON ELECTRIC                     
                                                            GC-01               0                  06/22/23   12/22/23    BETTE & CRING                       
                                                            GC-02               0                  06/22/23   12/22/23    BETTE & CRING                       
                                                            GC-03               0                  09/19/23     /  /      BETTE & CRING                       
                                                            HM-001         28,525                  09/19/23     /  /      AAC CONTRACTING                     
                                                            HM-02               0                  09/11/23   12/18/23    AAC CONTACTING LLC                  
                                                            MC-01         -42,000                  05/17/23   12/28/23    NOTHERN MECHANICALS                 
                                                            MC-02         -21,000                  05/17/23   12/28/23    NORTHERN MECHANICALS                
                                                            MC-03         -16,500                  05/17/23   12/28/23    NORTHERN MECHANICALS                
                                                            MC-04           7,200                  05/17/23   12/28/23    NORTHERN MECHANICALS                
                                                            MC-05           5,000                  05/17/23   12/28/23    NORTHERN MECHANICALS                
                                                            MC-06          -7,429                  06/07/23   01/02/24    NORTHERN MECHANICALS                
                                                            MC-07          -5,400                  06/07/23   12/28/23    NORTHERN MECHANICALS                
                                                            MC-07          -5,400                  07/10/23   01/02/24    NORTH MECHANICALS                   
                                                            PC-01         -44,893                  05/17/23   12/28/23    NORWOOD PLUMBING                    
                                                            PC-02         -12,258                  05/17/23     /  /      NORWOOD PLUMBING                    
                                                            PC-03         -14,018                  05/17/23   12/28/23    NORWOOD PLUMBING                    
                                                            PC-04               0                  09/11/23   12/26/23    NORWOOD PLUMBING INC                
                                                            PC-05               0                  09/11/23   12/26/23    NORWOOD PLUMBING INC                
                                                            PC-06               0                  09/11/23   12/26/23    NORWOOD PLUMBING INC                
                                                            PC-07               0                  09/19/23     /  /      NORWOOD PLUMBING                    
                                                            SC-001        -13,697                  05/17/23   12/27/23    TJ FIACCO CONSTRUCTION              
 
22-1046   Reconstruction               0-010-025  12/23/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  05/17/23   12/28/23    WATSON ELECTRIC                     
                                                            ec-02          -2,709                  05/17/23   12/28/23    WATSON ELECTRIC                     
 
23-0194   Reconstruction               0-010-026  10/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0590   Reconstruction               0-010-027  09/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0761FP Reconstruction               0-010-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0354SC Visual Structural Inspection 0-010-SC1  11/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          1998 Small Bus Garage:
96-0923   New Construction             5-012-001  04/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1139   Reconstruction               5-012-002  05/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-003             0                  10/02/13   10/24/13    Bette & Cring LLC                   
                                                            101-005             0                  05/06/13   09/12/13    Bette & Craig LLC                   
                                                            101-006         7,203                  10/02/13   10/24/13    Bette & Cring LLC                   
                                                            101-008             0                  05/06/13   04/08/14    Bette & Craig LLC                   
                                                            101-012         1,046                  10/02/13   10/24/13    Bette & Cring LLC                   
                                                            103-002           360                  10/02/13   02/12/14    Norwood Plumbing Inc.               
                                                            103-005A        1,206                  05/28/14   06/24/14    Norwood Plumbing, Inc.              
                                                            104-001             0                  10/02/13   02/12/14    Dow Electric, Inc.                  
 
21-1813   Reconstruction               5-012-003  11/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
15-0423   New Construction             7-013-001  06/16/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-05           5,682                  05/07/18   05/14/18    TJ Fiacco Construction LLC          
 

          Restroom/Concession Bldg:
17-0779   New Construction             7-015-001  07/06/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
94-1593   Reconstruction               7-999-001  06/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE

CLIFTON FINE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-04-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Clifton-Fine School:
91-1401   Reconstruction               0-002-003  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1402   Reconstruction               0-002-004  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0702   Reconstruction               0-002-005  03/05/97  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0099   Reconstruction               0-002-006  09/01/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0329   Additions and Alterations    0-002-007  02/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00069          -2,200                  04/01/02   05/13/02    Cardinal Const.                     
                                                            00070             985                  04/01/02   05/13/02    Empire Northeast                    
                                                            04                945             945  05/26/06   Disapproved Harvey Excavation & Construction Co.
                                                            103             7,625                  12/19/01   05/29/02    Cardinal Const.                     
                                                            31             21,498                  01/02/01   01/10/01    NTS Services                        
                                                            33                500             500  05/26/06   Disapproved Shaw Contract Flooring              
                                                            51             38,368          38,368  05/26/06   Disapproved NTS Services                        
                                                            53              6,877           6,877  05/25/06   Disapproved Empire Northeast Inc.               
                                                            57              5,030                  05/26/06   Disapproved NTS Services                        
                                                            64              4,200                  12/19/01   05/29/02    Ritchie Bros.                       
                                                            65              3,700                  12/19/01   05/29/02    Empire Northeast                    
                                                            66             29,617                  12/12/01   05/29/02    Harvey Excavation                   
                                                            67              2,747                  01/09/02   05/28/02    Ritchie Bros.                       
                                                            7               6,508                  01/17/01   01/09/02    Harvey Excavation                   
                                                            G-1            -2,000                  03/18/04   04/07/04    Ritchie Brothers                    
                                                            P-1            -2,000                  05/19/04   05/27/04    Skelly Contractors                  
 
98-1271   Reconstruction               0-002-008  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0566   Reconstruction               0-002-009  03/20/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-01        -13,181                  11/22/11   04/05/12    AAC CONTRACTING INC                 
                                                            E-001           2,114                  01/26/11   02/24/11    COLLINS-HAMMOND ELECTRICAL CONTR INC
                                                            G-001          39,500                  09/21/09   10/26/09    RITCHIE BROTHERS INC                
                                                            G-001             -85                  12/06/11   04/05/12    MURNANE BUILDING CONTRACTORS INC    
                                                            G-002          10,127                  02/17/10   04/16/10    RITCHIE BROTHERS INC                
                                                            G-003           8,683                  05/17/10   07/28/10    RITCHIE BROTHERS INC                
                                                            G-004           8,310                  05/19/10   07/21/10    RITCHIE BROTHERS INC                
                                                            G-005          -7,574                  11/15/10   11/17/10    RITCHIE BROTHERS INC                
                                                            H-001          -9,649                  04/28/11   05/20/11    NORTHERN MECHANICALS INC            
                                                            P-001           5,500                  09/21/09   10/26/09    NORWOOD PLUMBING INC                
                                                            P-002          -1,472                  01/26/11   02/24/11    NORWOOD PLUMBING INC                
 
07-1967   Reconstruction               0-002-010  05/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R002            4,783                  05/17/10   08/04/10    WJ FARLEY ROOFING CORP              
 
12-1234   Reconstruction               0-002-012  06/27/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001          -5,000                  10/15/13   12/09/13    RITCHIE BROTHERS INC                
 
13-1538   Reconstruction               0-002-013  06/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -1,228                  09/10/14   10/01/14    Northern Tier Contracting           
                                                            GC-002           -464                  09/10/14   10/01/14    Northern Tier Contracting           
 
14-1583   Reconstruction               0-002-015  05/18/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001            348                  01/19/17   01/20/17    Northern Glass Company              
 
15-0049   Reconstruction               0-002-016  07/24/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -4,617                  06/29/16   07/27/16    Continental Construction, LLC       
 
15-1910   Reconstruction               0-002-017  07/05/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01          -4,000                  03/27/17   06/06/17    Murnane Building Contractors, Inc.  
 
15-1934   Reconstruction               0-002-018  06/28/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01          -1,568                  04/28/17   06/06/17    Northern Tier Contracting           
 
16-2115   Reconstruction               0-002-019  09/11/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0585   Reconstruction               0-002-020  02/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           22,790                  08/19/19   08/21/19    NORTHERN TIER CONTRACTING           
                                                            1-02           12,777                  08/07/19   08/13/19    NORTHERN TIER CONTRACTING           
                                                            1-03          -21,820                  09/01/20   11/20/20    NORTHERN TIER CONTRACTING           
                                                            101-01         -5,934                  11/25/20   05/07/21    NORTHERN TIER CONTRACTING, INC.     
                                                            2-01             -650                  11/25/20   02/05/21    BURNS BROS. MECHANICAL              
                                                            201-01         -9,350                  11/25/20   02/05/21    BURNS BROS. CONTRACTORS             
                                                            3-01            8,000                  11/27/19   12/17/19    ENI MECHANICAL, INC.                
                                                            301-01              0                  11/25/20   02/05/21    ENI MECHANICAL                      
                                                            4-01           -6,897                  11/25/20   02/05/21    S&L ELECTRIC                        
                                                            401-01         -5,825                  11/25/20   02/05/21    S&L ELECTRIC                        
                                                            5-01           48,186                  08/23/19   09/13/19    BARRETT PAVING MATERIALS            
                                                            5-02           -3,077                  11/25/19   12/27/19    BARREL PAVING MATERIALS             
                                                            501-01         -6,922                  11/25/20   05/07/21    BARRETT PAVING MATERIALS, INC.      
 
18-0005   Reconstruction               0-002-021  08/01/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           13,950                  08/30/19   09/24/19    NICKERSON CORP.                     
                                                            1-02           -6,566                  05/14/19   07/02/19    NICKERSON CORP.                     
 
19-0595   Reconstruction               0-002-022  01/10/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -5,000                  12/21/20   03/31/21    CONTINENTAL CONSTRUCTION, LLC       
 
20-1491   Reconstruction               0-002-023  07/31/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -24,436                  04/06/22   02/13/23    Continental Const LLC               
                                                            1-01           24,436                  12/16/22     /  /      Continental Const LLC               
                                                            1-02           20,079                  04/06/22   02/13/23    Continental Const                   
                                                            1-02           20,079                  12/16/22     /  /      Continental Const LLC               
                                                            1-03           21,517                  07/29/22   09/26/23    Continental Const LLC               
                                                            1-03           21,617                  12/16/22     /  /      Continental Const LLC               
                                                            1-04           25,404                  07/29/22   09/26/23    Continental Const LLC               
                                                            1-04           25,404                  12/16/22     /  /      Continental Const LLC               
                                                            1-05          -11,999                  07/29/22   09/26/23    Continental Const LLC               
                                                            1-05           11,999                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-06          -27,728                  07/29/22   09/26/23    Continental Const LLC               
                                                            1-06           27,728                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-07          -29,453                  07/29/22     /  /      Continental Const LLC               
                                                            1-07           29,453                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-08            9,923                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-09           10,689                  12/16/22     /  /      Continental Const LLC               
                                                            1-11            2,840                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-12           12,581                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-13            2,838                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-14           20,995                  12/16/22   12/06/23    Continental Const LLC               
                                                            1-15           34,469          34,469  12/16/22   12/15/23    Continental Const LLC               
                                                            1-16           12,506                  12/16/22   12/06/23    Continental Const LLC               
                                                            101-01              0                  02/10/23   12/14/23    CONTINENETAL CONSTRUCTION           
                                                            101-02              0                  02/10/23   12/14/23    CONTINENTAL CONSTRUCTION            
                                                            101-03              0                  02/10/23   12/14/23    CONTINENTAL CONSTRUCTION            
                                                            101-04              0                  02/10/23   12/14/23    CONTINENTAL CONSTRUCTION            
                                                            101-05              0                  02/10/23   12/14/23    CONTINENTAL CONSTRUCTION            
                                                            101-06              0                  02/10/23   12/14/23    CONTINENTAL CONSTRUCTION            
                                                            2-01            6,207                  04/06/22   03/07/23    Skelly Contrs Inc                   
                                                            2-02           -5,000                  02/10/23   12/11/23    SKELLY CONTRACTORS INC              
                                                            3-01            6,083                  04/06/22   03/07/23    Watson Elec                         
                                                            3-02            3,724                  02/10/23     /  /      WATSON ELECTRIC                     
                                                            3-03            1,140                  02/10/23     /  /      WATSON ELEC                         
                                                            301-01              0                  02/10/23   12/11/23    WATSON ELEC INC                     
                                                            301-02              0                  02/10/23   12/11/23    WATSON ELEC INC                     
 
20-0345   Reconstruction               0-002-024  11/12/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -1,117                  06/30/21   03/16/22    Continental Construction LLC        
                                                            101-01              0                  06/30/21   03/16/22    Continental Construction LLC        
                                                            101-02              0                  06/30/21   03/16/22    Continental Construction LLC        
 
20-1567   Reconstruction               0-002-025  06/15/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01                0                  03/17/22   03/30/23    Bonno Blders LLC                    
                                                            101-01              0                  07/20/22   05/08/23    Bonno Builders                      
 
21-1950   Reconstruction               0-002-026  06/28/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02              368                  04/06/23   12/21/23    CON TECH BUILDING SYSTEM, INC       
 
22-2044FC Reconstruction               0-002-028  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2342   Reconstruction               0-002-029  07/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0297FP Reconstruction               0-002-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0441SC Visual Structural Inspection 0-002-SC1  10/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0442SC Visual Structural Inspection 0-002-SC2  10/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
91-1403   Reconstruction               5-001-001  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0328   Reconstruction               5-001-002  02/08/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1968   Reconstruction               5-001-003  05/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R001            7,480                  01/08/09   04/01/09    W.J. FARLEY ROOFING CORP.           
 
08-0567   Reconstruction               5-001-004  03/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0070   Reconstruction               5-001-006  10/11/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -17,526                  09/10/19   09/26/19    CONTINENIAL CONSTRUCTION, LLC       
                                                            2-01            2,057                  12/03/20   02/03/21    ENI MECHANICAL                      
 

          District-Wide:
16-1343   Reconstruction               7-999-001  09/05/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01               35                  10/16/18   11/29/18    WHITTION CONSTRUCTION LLC           
                                                            2-01            4,540                  09/13/18   09/20/18    TEL INC                             
 

COLTON-PIERREPONT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-05-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
91-0615   Reconstruction               0-001-005  06/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1115   Reconstruction               0-001-006  06/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1667   Reconstruction               0-001-007  07/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1179   Reconstruction               0-001-008  04/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0059   Additions and Alterations    0-001-009  05/05/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001             6,507                  11/07/06   12/28/06    Northern Glass Co                   
                                                            005            -2,557                  01/09/06   07/24/06    bette Cring                         
                                                            E-001           8,428                  09/02/05   09/08/05    Watson Electric                     
                                                            E-002          10,624                  11/09/05   11/23/05    watson electric                     
                                                            E-003           6,176                  01/09/06   06/30/06    Watson Electric                     
                                                            E-004          12,737                  01/09/06   06/30/06    Watson Electric                     
                                                            E-005            -267                  03/10/06   06/23/06    Watson electric                     
                                                            E-006          -9,711                  05/22/06   07/20/06    Watson Electric                     
                                                            E-007            -482                  06/21/06   10/27/06    Watson Electric                     
                                                            E-008          -9,775                  08/25/06   01/09/07    Watson Electric                     
                                                            E-009               0                  08/25/06   01/09/07    Watson Electric                     
                                                            E-010          12,277                  11/07/06   01/09/07    Watson Electric                     
                                                            E-011               0                  11/07/06   01/09/07    Watson Electric                     
                                                            E-012               3                  11/22/06   01/09/07    Watson Electric                     
                                                            E-013               0                  01/26/07   02/09/07    Watson Electric                     
                                                            E-014               0                  07/27/07   10/23/07    Watson Electric                     
                                                            E-016          14,023                  07/27/07   08/05/08    Watson Electric                     
                                                            E-017           4,664                  10/01/07   10/23/07    WATSON ELECTRIC, INC.               
                                                            Fp-001         -8,076                  01/22/07   03/14/07    SRI Fire Sprinkles                  
                                                            G-007          -7,038                  02/17/06   08/09/06    Bette Cring                         
                                                            G-008               0                  03/08/06   05/25/06    Bette Cring                         
                                                            G-009          33,745                  05/22/06   07/14/06    Bette Cring                         
                                                            G-010         141,596                  05/22/06   07/14/06    Bette Cring                         
                                                            G-011           4,652                  06/08/06   07/14/06    Bette Cring                         
                                                            G-012             856                  06/08/06   07/14/06    Bette and Cring                     
                                                            G-013           1,382                  06/08/06   07/14/06    Bette Cring                         
                                                            G-014         -25,624                  08/25/06   10/13/06    Bette Cring                         
                                                            G-015          -8,663                  11/07/06   12/28/06    Bette Cring                         
                                                            G-016           7,016                  11/22/06   01/09/07    Bette Cring                         
                                                            G-017           5,984                  11/22/06   01/09/07    Bette Cring                         
                                                            G-019          29,936                  02/14/07   03/14/07    Bette Cring                         
                                                            G-020           1,795                  02/14/07   03/14/07    Bette Cring                         
                                                            G-021             974                  03/23/07   04/03/07    Bette Cring                         
                                                            G-022           3,096                  05/29/07   06/20/07    Bette and Cring                     
                                                            G-023           1,874                  10/01/07   11/07/07    BETTE & CRING, LLC                  
                                                            G-024            -907                  06/18/08   02/20/09    BETTE & CRING, LLC                  
                                                            G018           -3,867                  01/18/07   01/30/07    Bette Cring                         
                                                            GC-001         14,000                  09/02/05   09/08/05    Bette Cring                         
                                                            GC-004        104,626                  01/09/06   08/09/06    Bette Cring                         
                                                            GC-006          3,631                  03/02/06   06/30/06    Bette Cring                         
                                                            GC-025         -3,000                  06/18/08   02/20/09    BETTE & CRING, LLC                  
                                                            GC-026         -5,967                  12/08/08   01/22/09    BETTE & CRING, LLC                  
                                                            Gc-002         80,600                  11/09/05   02/15/06    Bette Cring                         
                                                            Gc-003        109,000                  11/09/05   02/15/06    Bette Cring                         
                                                            H-002               0                  01/18/07   02/01/07    Northern Mechanicals                
                                                            H-003               0                  01/18/07   02/01/07    Norhtern Mechanical                 
                                                            H-004               0                  05/29/07   10/23/07    Northern mechanical                 
                                                            H-005          -7,556                  10/03/07   11/07/07    Northern Mechanical                 
                                                            H-01           -2,690                  11/07/06   01/09/07    Northern mechanicals                
                                                            P-001         -10,398                  03/28/06   06/19/06    Empire Northeast                    
                                                            P-002               0                  03/28/06   06/19/06    Empire Northeast                    
                                                            P-004               0                  03/28/06   06/19/06    Empire northeast                    
                                                            P-005          -3,006                  06/21/06   10/27/06    Empire Northeast                    
                                                            P-006               0                  11/07/06   01/09/07    Empire Northeast                    
                                                            P-007               0                  11/07/06   01/09/07    Empire Northeast                    
                                                            P-010          11,124                  02/01/07   02/09/07    Empire Nrotheast inc                
                                                            P-012           5,328                  05/29/07   10/23/07    Empire Northeast                    
                                                            P-013           1,900                  10/09/07   01/28/08    EMPIRE NORTHEAST INC                
                                                            P-014           1,541                  06/18/08   02/11/09    Empire Northeast                    
                                                            P-015             907                  06/18/09   02/20/09    EMPIRE NORTHEAST, INC.              
 
07-0486   Reconstruction               0-001-011  10/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01           2,567                  01/02/08   01/14/08    S & L Electric                      
                                                            GC-01             424                  05/07/08   08/05/08    HARVEY EXCAVATION AND CONSTRUCTION  
 
08-1576   Reconstruction               0-001-012  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  01/04/10   05/10/10    W.J. FARLEY ROOFING CORP            
                                                            002            -7,714                  01/04/10   05/10/10    W.J. FARLEY ROOFING CORP            
 
10-1104   Reconstruction               0-001-013  06/08/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               612                  08/30/12   12/21/12    NORTHERN TIER CONTRACTING INC       
 
16-0480   Reconstruction               0-001-014  05/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           29,617                  04/11/18   05/02/18    Northern Tier Contracting           
                                                            1-02           11,130                  04/11/18   05/02/18    Northern Tier Contracting           
                                                            1-03            3,073                  01/15/19   02/11/19    NORTHERN TIER CONTRACTING           
                                                            101-04              0                  11/22/17   02/14/18    Northern Tier Contracting, Inc.     
                                                            101-05              0                  11/22/17   02/14/18    Northern Tier Contracting, Inc.     
                                                            101-07              0                  03/26/18   03/28/18    Northern Tier Contracting, Inc.     
                                                            2-01            5,530                  10/24/18   11/09/18    HYDE STONE MECHANICAL CONTRACTORS   
                                                            3-02            2,830                  04/11/18   04/12/18    Watson Electric                     
                                                            3-03           11,130                  01/31/19   02/25/19    WATSON ELECTRIC                     
                                                            3-04           13,281                  01/31/19   02/25/19    WATSON ELECTRIC                     
                                                            3-05           31,000                  01/31/19   02/25/19    WATSON ELECTRIC                     
                                                            3-06            9,325                  01/31/19   02/25/19    WATSON ELECTRIC                     
                                                            3-07           18,373                  01/31/19   02/25/19    WATSON ELECTRIC                     
                                                            3-08            6,294                  07/11/19   07/12/19    WATSON ELECTRIC                     
                                                            301-02              0                  12/04/17   12/15/17    Watson Electric                     
                                                            4-01          -16,350                  01/16/19   02/11/19    PTL CONTRACTING                     
 
20-1879   Reconstruction               0-001-015  06/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1832   Reconstruction               0-001-016  07/26/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -5,000                  06/09/23     /  /      ZERODRAFT OF CNY                    
 
22-1969   Reconstruction               0-001-017  06/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
03-0060   Reconstruction               5-002-001  05/05/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-015               0                  07/27/07   10/23/07    Watson Electric                     
                                                            P-003               0                  03/28/06   06/19/06    Empire northeast                    
                                                            P-008               0                  11/07/06   01/09/07    Empire Northeast                    
                                                            P-009               0                  02/01/07   02/09/07    Empire Northeast                    
                                                            P-011           3,593                  03/30/07   04/03/07    Empire Northeast                    
 
11-0155   Reconstruction               5-002-002  09/15/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -1,000                  08/27/12   07/02/13    PARAGON ENVIRONMENTAL CONSTRUCTION  
                                                            002             1,143                  09/21/12   07/02/13    PARAGON ENVIRONMENTAL CONSTRUCTION  
 
16-0481   Reconstruction               5-002-003  05/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-06              0                  11/22/17   02/14/18    Northern Tier Contracting, Inc.     
                                                            3-01           12,132                  01/24/18   03/08/18    Watson Electric                     
                                                            301-01              0                  11/22/17   02/14/18    Watson Electric                     
 

GOUVERNEUR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-11-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Gouverneur ES (fmly East Side ES):
96-1132   Reconstruction               0-003-005  04/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1088   Reconstruction               0-003-006  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1575   Reconstruction               0-003-007  11/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1C             -4,075                  01/08/04   01/13/04    Bette & Cring                       
                                                            3C              4,075                  01/08/04   03/17/05    Bette & Cring                       
                                                            5             -10,643                  03/17/03   03/17/05    Acts II Const.                      
                                                            6               1,544                  01/08/04   01/13/04    Bette & Cring                       
                                                            8                 586                  03/25/05   04/15/05    Sand L Electric                     
 
07-0430   Reconstruction               0-003-008  04/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-003          -6,438                  03/27/09   06/15/09    BARRETT PAVING MATERIALS, INC.      
                                                            1-004          -3,508                  03/27/09   06/15/09    BARRETT PAVING MATERIALS, INC.      
                                                            1-005          21,913                  10/07/08   10/23/08    BARRETT PAVING MATERIAL             
                                                            1-007             263                  10/24/08   03/19/09    BARRETT PAVING MATERIALS, INC.      
                                                            2-006           2,407                  03/27/09   04/23/09    RITCHIE BROTHERS, INC.              
                                                            2-006 F         3,590                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-009          44,700                  05/29/09   07/12/12    RITCHIE BROTHERS INC                
                                                            2-009 F             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-010 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-012           4,654                  07/08/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-012 F             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-013 F             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-016          14,762                  07/17/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-017          38,374                  07/17/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-021 F           661                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            3-002          24,489                  09/21/10   10/01/10    NORTHERN MECHANICALS INC            
                                                            3-003          -1,680                  10/15/10   10/29/10    NORTHERN MECHANICALS INC            
                                                            4-002           5,398                  06/12/09   09/23/09    EMPIRE NORTHEAST INC                
                                                            4-004             803                  11/23/10   12/14/10    EMPIRE NORTHEAST INC                
                                                            5-001 F           924                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            5-004             425                  11/23/10   12/13/10    WATSON ELECTRIC INC                 
                                                            5-011           2,774                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            6-002 F         1,677                  11/23/10   12/14/10    GOUVERNEUR ROOFING                  
                                                            6-004          -6,771                  03/02/09   06/23/09    GOUVERNEUR ROOFING, SIDING, & SHEET 
 
14-1334   Reconstruction               0-003-010  04/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0327   Additions and Alterations    0-003-011  06/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            General3        9,309                  11/13/17   11/29/17    Northland Associates, Inc.          
 
17-0351   Reconstruction               0-003-012  02/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            G1            -20,700                  08/16/18   06/06/19    CON TECH BUILDING SYSTEMS INC       
                                                            G2               -540                  01/29/19   06/06/19    CON TECH BUILDING SYSTEMS, INC.     
 

          Fowler Elementary School:
96-1133   Reconstruction               0-004-005  04/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1086   Reconstruction               0-004-006  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1576   Reconstruction               0-004-007  11/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            12              4,380                  01/08/04   01/13/04    Bette & Cring                       
                                                            7C              1,162                  01/08/04   01/13/04    Bette & Cring                       
                                                            9                 358                  03/25/05   04/15/05    S and L Electric                    
 
07-0432   Reconstruction               0-004-008  04/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-005          -4,561                  03/27/09   06/15/09    BARRETT PAVING MATERIALS, INC.      
                                                            1-009REV       12,225                  10/24/08   02/26/09    BARRETT PAVING MATERIALS, INC.      
                                                            1-012          21,150                  01/12/10   02/22/10    BARRETT PAVING MATERIALS INC        
                                                            2-003          -1,482                  09/03/08   10/21/08    RITCHIE BROTHERS, INC.              
                                                            2-007           1,144                  03/27/09   04/23/09    RITCHIE BROTHERS, INC.              
                                                            2-007 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-007 F         1,612                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-009 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-011 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-013           3,599                  07/08/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-022 F           661                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            3-006          -1,660                  06/03/11   06/10/11    NORTHERN MECHANICALS INC            
                                                            3-006 F         8,985                  11/23/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            4-002           1,940                  11/23/10   12/14/10    EMPIRE NORTHEAST INC                
                                                            4-006           2,071                  11/24/09   01/12/10    EMPIRE NORTHEAST INC                
                                                            5-012           3,820                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            6-006          -4,238                  10/13/09   11/30/09    GOUVERNEUR ROOFING SIDING & SHEETMET
                                                            6-006 F           235                  11/23/10   12/16/10    GOUVERNEUR ROOFING                  
 
06-1101   Reconstruction               0-004-009  06/15/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001          18,863                  12/27/07   01/07/08    Continental Construction, LLC       
 

          West Side Middle (fmly West Side ES):
96-1134   Reconstruction               0-006-005  04/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1087   Reconstruction               0-006-006  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1577   Reconstruction               0-006-007  11/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            17              2,326                  05/28/04   07/14/04    Bette & Cring                       
                                                            19              2,093                  09/03/04   09/17/04    Bette & Cring                       
                                                            1B             -4,075                  01/08/04   01/13/04    Bette & Cring                       
                                                            28              1,381                  01/04/05   01/10/05    Bette & Cring                       
                                                            3               4,475                  05/25/04   07/14/04    S&L Elec.                           
                                                            31             -3,256                  10/28/05   12/05/05    Bette Cring                         
                                                            3B              4,075                  01/08/04   01/13/04    Bette & Cring                       
                                                            5               1,544                  01/08/04   01/13/04    Bette & Cring                       
                                                            7                 646                  03/25/05   04/15/05    S and L Electric                    
                                                            7B              1,597                  01/08/04   01/13/04    Bette & Cring                       
 
07-0433   Reconstruction               0-006-008  04/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-004          16,888                  10/07/08   10/23/08    BARRETT PAVING MATERIALS            
                                                            1-006             572                  10/24/08   03/19/09    BARRETT PAVING MATERIALS, INC.      
                                                            2-001          -2,500                  09/03/08   10/21/08    RITCHIE BROTHERS, INC.              
                                                            2-002          -3,675                  09/03/08   10/21/08    RITCHIE BROTHERS, INC.              
                                                            2-002 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-004 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-005           2,347                  03/27/09   04/23/09    RITCHIE BROTHERS, INC.              
                                                            2-005 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-005 F         3,326                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-010          46,105                  07/17/09   09/01/09    RITCHIE BROTHERS INC                
                                                            2-010 F             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-011           2,228                  07/08/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-011 F             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-014          13,024                  07/17/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-014 F             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-015          33,504                  07/17/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-020 F           661                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-025 F           301                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            3-004          -1,680                  10/15/10   10/29/10    NORTHERN MECHANICALS INC            
                                                            3-005 F         1,463                  11/23/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            4-001           8,275                  06/12/09   09/23/09    EMPIRE NORTHEAST INC                
                                                            4-005           4,142                  11/24/09   01/12/10    EMPIRE NORTHEAST INC                
                                                            5-002 F           701                  11/23/10   12/13/10    WATSON ELECTRIC INC                 
                                                            5-003 F           425                  11/23/10   12/13/10    WATSON ELECTRIC INC                 
                                                            5-009           2,303                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            5-010           1,548                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            6-005          -8,276                  10/13/09   11/30/09    GOUVERNEUR ROOFING, SIDING & SHEET  
                                                            6-005 F         1,750                  11/23/10   12/16/10    GOUVERNEUR ROOFING                  
 
15-0328   Additions and Alterations    0-006-011  06/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2            19,747                  11/20/18   01/04/19    WATSON ELECTRIC                     
                                                            E1             28,818                  02/20/18   03/07/18    Watson Electric                     
                                                            ELEC-3        -24,587                  12/19/18   01/28/19    WATSON ELECTRIC                     
                                                            G-10           15,747                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G-11           20,041                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G-12           24,017                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G-13           12,843                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G-14           19,481                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G-6            11,977                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G-7            16,641                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G-8            19,585                  08/16/18   12/28/18    Northland Associates                
                                                            G-9            18,543                  08/16/18   12/28/18    NORTHLAND CONSTRUCTION, INC.        
                                                            G5             25,200                  02/20/18   02/28/18    Northland Associates, Inc.          
                                                            GEN-15         18,740                  11/20/18   01/07/19    NORTHLAND CONSTRUCTION, INC.        
                                                            GEN-16          9,101                  11/20/18   01/07/19    NORTHLAND CONSTRUCTION, INC.        
                                                            GEN-17          7,842                  11/20/18   01/07/19    NORTHLAND CONSTRUCTION, INC.        
                                                            GEN-18         19,806                  11/20/18   01/07/19    NORTHLAND CONSTRUCTION, INC.        
                                                            GEN-19         19,908                  11/20/18   01/07/19    NORTHLAND CONSTRUCTION, INC.        
                                                            GEN-20         18,338                  11/20/18   01/07/19    NORTHLAND CONSTRUCTION, INC.        
                                                            GEN-21        -23,560                  12/19/18   01/29/19    NORTHLAND ASSOCIATES, INC.          
                                                            General1       11,457                  11/13/17   11/29/17    Northland Associates, Inc.          
                                                            General2       10,626                  11/13/17   11/29/17    Northland Associates, Inc.          
                                                            General4        8,202                  11/13/17   11/29/17    Northland Associates, Inc.          
                                                            MC-01        -100,206                  12/19/18   01/28/19    LAWMAN HEATING & COOLING, INC.      
                                                            PLBG-01        25,468                  11/20/18   01/04/19    LAWMEN HEATING & COOLING, INC.      
                                                            PLBG-2        -15,352                  12/19/18   01/29/19    LAWMAN HEATING & COOLING INC..      
                                                            S1            -30,000                  12/26/18   02/12/19    E-Z PAVING/SEALCOAT LLC             
                                                            S2            -42,946                  12/26/18   02/12/19    E-Z PAVING/ SEALCOAT LLC            
 

          Senior High School:
01-0063   Reconstruction               0-007-002  07/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1135   Reconstruction               0-007-003  04/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1085   Reconstruction               0-007-004  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1578   Additions and Alterations    0-007-005  11/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  03/17/03   03/19/03    Murnane Building Contractors        
                                                            1              -1,720                  03/17/03   03/19/03    RSI Roofing                         
                                                            1               1,128                  03/17/03   03/17/05    Northern Mech.                      
                                                            1              10,971                  03/17/03   03/17/05    Con Tech Building Systems           
                                                            1               8,942                  05/20/04   07/14/04    Northern Mech.                      
                                                            1              59,692                  01/13/05   03/16/05    S and L electric                    
                                                            1              -3,348                  01/13/05   03/16/05    Skelly Contractors                  
                                                            10              1,290                  03/25/05   04/15/05    S and L Electric                    
                                                            11              3,827                  01/08/04   01/13/04    Bette & Cring                       
                                                            11              1,695                  03/25/05   04/15/05    S and L Electric                    
                                                            12              1,881                  03/25/05   04/15/05    S and L Electric                    
                                                            13             11,532                  01/08/04   03/17/05    Bette & Cring                       
                                                            13              3,515                  03/25/05   04/15/05    s and L Electric                    
                                                            14              6,564                  05/28/04   07/14/04    Bette & Cring                       
                                                            15              5,665                  05/28/04   03/17/05    Bette & Cring                       
                                                            16              1,456                  05/28/04   07/14/04    Bette & Cring                       
                                                            18             10,762          10,762  09/02/04   09/17/04    Bette & Cring                       
                                                            1A             67,945                  01/08/04   01/13/04    Bette & Cring                       
                                                            2               4,536                  03/17/03   03/19/03    Jordstat Const.                     
                                                            2              -3,378                  03/17/03   03/19/03    Skelly Contractors                  
                                                            2                -183                  03/17/03   03/19/03    Northern Mech.                      
                                                            2               3,541                  03/17/03   03/17/05    Con Tech Building Systems           
                                                            2               6,819                  05/25/04   07/14/04    S&L Elec.                           
                                                            2               2,344                  07/27/04   08/09/04    Northern Mech.                      
                                                            20              6,432           6,432  09/02/04   09/17/04    Bette & Cring                       
                                                            21              2,880                  09/02/04   09/17/04    Bette & Cring                       
                                                            22              6,503                  09/02/04   09/17/04    Bette & Cring                       
                                                            23              3,911                  09/02/04   09/17/04    Bette & Cring                       
                                                            24              5,342                  09/02/04   09/17/04    Bette & Cring                       
                                                            25              3,265                  10/27/04   11/03/04    Bette & Cring                       
                                                            26              5,490                  01/04/05   01/10/05    Bette & Cring                       
                                                            27              1,419                  01/04/05   01/10/05    Bette & Cring                       
                                                            3                -254                  03/17/03   03/19/03    Northern Mech.                      
                                                            3             -10,570                  03/24/03   03/28/03    Con Tech Building Systems           
                                                            3               2,588                  09/02/04   09/17/04    Northern Mech.                      
                                                            3A             67,945                  01/08/04   03/17/05    Bette & Cring                       
                                                            4              17,032                  07/23/03   08/04/03    Northern Mech.                      
                                                            4              97,401                  01/08/04   01/13/04    Bette & Cring                       
                                                            4               2,397                  05/25/04   07/14/04    S&L Elec.                           
                                                            4               1,469                  02/15/05   03/14/05    Northern Mechanical                 
                                                            5               2,806                  09/02/04   09/17/04    S&L Elec.                           
                                                            6               3,002                  03/25/05   04/15/05    S and L Electric                    
                                                            7A             -3,581                  01/08/04   01/13/04    Bette & Cring                       
                                                            8              23,984                  01/08/04   03/17/05    Bette & Cring                       
 
07-0435   Reconstruction               0-007-006  04/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001 F        -7,003                  03/27/09   06/15/09    BARRETT PACING MATERIALS, INC.      
                                                            1-002           1,733                  08/26/08   10/07/08    Barrett Paving Materials, Inc.      
                                                            1-003          37,724                  10/07/08   03/19/09    BARRETT PAVING MATERIALS            
                                                            1-008           6,883                  10/24/08   03/19/09    BARRETT PAVING MATERIALS, INC.      
                                                            1-011           3,490                  10/27/09   11/30/09    BARRETT PAVING MATERIALS INC        
                                                            1-013          12,208                  02/16/10   06/04/10    BARRETT PAVING MATERIALS INC        
                                                            2-001 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-001 F           496                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-003 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-003 F           267                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-004           7,284                  03/27/09   04/23/09    RITCHIE BROTHERS INC.               
                                                            2-004 F         2,284                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-006 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-008 F         6,253                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-012 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-016 F         1,945                  11/23/10   12/16/10    RITCHIE BROTHERS INC                
                                                            2-017 F         1,826                  11/23/10   12/21/10    RITCHIE BROTHERS INC                
                                                            2-019          -7,652                  03/25/10   05/12/10    RITCHIE BROTHERS INC                
                                                            2-019 F         4,631                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-026 F         2,254                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            3-001 F           903                  11/23/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            3-002 F        10,375                  11/23/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            3-003 F         3,063                  11/23/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            3-004 F           910                  11/23/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            3-005          -4,301                  11/23/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            4-003          10,400                  10/13/09   11/30/09    EMPIRE NORTHEAST INC                
                                                            4-007          -2,485                  11/16/10   12/14/10    EMPIRE NORTHEAST INC                
                                                            5-001           5,936                  02/03/09   03/05/09    WATSON ELECTRIC, INC.               
                                                            5-002          15,011                  02/03/09   03/06/09    WATSON ELECTRIC, INC.               
                                                            5-004           6,808                  11/24/09   01/12/10    WATSON ELECTRIC INC                 
                                                            5-005             458                  03/05/10   04/28/10    WATSON ELECTRIC INC                 
                                                            5-005 F           629                  11/23/10   12/13/10    WATSON ELECTRIC INC                 
                                                            5-006 F         3,814                  11/23/10   12/13/10    WATSON ELECTRIC INC                 
                                                            5-007 F         1,674                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            5-008             634                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            6-001          33,900                  09/10/08   10/24/08    GOUVERNEUR ROOFING,SIDING,SHEETMETAL
                                                            6-003          -3,745                  03/02/09   06/23/09    GOUVERNEUR ROOFING, SLIDING & SHEET 
                                                            6-003 F         4,718                  11/23/10   12/16/10    GOUVERNEUR ROOFING                  
                                                            6-004 F         1,018                  11/23/10   12/16/10    GOUVERNEUR ROOFING                  
                                                            6-007         -29,790                  10/27/09   11/30/09    GOUVERNEUR ROOFING SIDING&SHEETMETAL
 
06-1102   Reconstruction               0-007-007  06/15/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-002          22,666                  01/22/08   03/15/08    Continental Construction            
 
07-0436   Reconstruction               0-007-008  04/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001           8,313                  08/26/08   10/07/08    Barrett Paving Materials, Inc.      
                                                            1-002          -8,454                  03/27/09   06/15/09    BARRETT PAVING MATERIALS, INC.      
                                                            1-010           1,365                  10/27/09   11/30/09    BARRETT PAVING MATERIALS INC        
                                                            2-002 F           498                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-015 F             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            4-003           1,346                  11/23/10   12/14/10    EMPIRE NORTHEAST INC                
 
09-0603   Reconstruction               0-007-009  04/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            9,499                  05/06/11   05/20/11    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-01F               0                  05/04/12   10/23/12    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-02           20,874                  05/06/11   05/20/11    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-02F               0                  05/04/12   10/23/12    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-03           47,805                  05/06/11   05/20/11    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-04          171,826                  05/06/11   05/20/11    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-05           21,415                  12/02/11   03/30/12    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-06           65,672                  11/23/11   03/30/12    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-07           37,853                  01/13/12   05/03/12    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-08          -21,292                  05/04/12   10/23/12    PUTRELO BUILDING ENTERPRISES INC    
                                                            1-09            2,206                  05/04/12   10/23/12    PUTRELO BUILDING ENTERPRISES INC    
                                                            2-01           12,217                  06/10/11   07/22/11    EMPIRE NORTHEAST INC                
                                                            2-02            2,993                  05/25/12   12/13/12    EMPIRE NORTHEAST INC                
                                                            3-01            5,246                  10/06/11   12/22/11    EMPIRE NORTHEAST, INC.              
                                                            3-02             -470                  12/23/11   07/16/12    EMPIRE NORTHEAST INC                
                                                            F/O 2-01            0                  05/25/12   12/13/12    EMPIRE NORTHEAST INC                
                                                            F/O 2-02            0                  05/25/12   12/13/12    EMPIRE NORTHEAST INC                
                                                            F/O 2-03            0                  05/25/12   12/13/12    EMPIRE NORTHEAST INC                
                                                            F/O 2-04            0                  05/25/12   12/13/12    EMPIRE NORTHEAST INC                
                                                            F/O 3-01        2,612                  12/23/11   07/16/12    EMPIRE NORTHEAST INC                
                                                            F/O 3-02        1,916                  12/23/11   07/16/12    EMPIRE NORTHEAST INC                
 
14-1335   Reconstruction               0-007-010  04/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1426   Reconstruction               0-007-011  12/18/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          26,659                  08/10/20   09/11/20    E.N.I. MECHANICAL, INC.             
                                                            EC-02           6,858                  08/10/20   09/11/20    E.N.I. MECHANICAL, INC.             
                                                            EC-03           7,169                  08/10/20   09/11/20    E.N.I. MECHANICAL, INC.             
                                                            EC-04          10,754                  08/10/20   09/11/20    E.N.I. MECHANICAL, INC.             
                                                            EC-05           7,839                  09/15/20   11/25/20    E.N.I. MECHANICAL, INC.             
                                                            EC-06           4,515                  09/15/20   11/25/20    E.N.I. MECHANICAL, INC.             
                                                            EC-07          54,619                  12/02/20   02/01/21    E.N.I. MECHANICAL, INC.             
                                                            EC-08          -2,128                  12/02/20   02/01/21    E.N.I. MECHANICAL, INC.             
                                                            EC-09            -190                  12/02/20   02/01/21    E.N.I. MECHANICAL, INC.             
                                                            GC-01          22,055                  08/27/19   09/13/19    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-02          -1,468                  12/05/19   12/27/19    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-03          29,590                  08/10/20   09/14/20    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-04           6,464                  08/10/20   09/14/20    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-05          20,000                  08/10/20   09/14/20    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-06          12,000                  08/10/20   09/14/20    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-07          19,026                  08/10/20   09/14/20    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-08          11,182                  09/15/20   11/06/20    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-09          -3,915                  12/02/20   02/19/21    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-10            -702                  12/02/20   02/19/21    NORTHERN TIER CONTRACTORS, INC.     
                                                            GC-11         -12,456                  12/02/20   02/19/21    NORTHERN TIER CONTRACTORS, INC.     
                                                            MC-01          26,754                  08/10/20   09/11/20    NORTHERN MECHANICAL, INC.           
                                                            MC-02         -29,364                  12/02/20   02/01/21    NORTHERN MECHANICAL, INC.           
                                                            PC-01          44,407                  08/27/19   08/28/19    LAWMAN HEATING & COOLING, INC.      
                                                            PC-02          10,614                  08/10/20   09/11/20    LAWMAN HEATING & COOLING, INC.      
                                                            PC-03          14,610                  08/10/20   09/11/20    LAWMAN HEATING & COOLING, INC.      
                                                            PC-04           8,659                  08/10/20   09/11/20    LAWMAN HEATING & COOLING, INC.      
                                                            PC-05          -5,325                  12/02/20   02/01/21    LAWMAN HEATING & COOLING, INC.      
 
16-1444   Reconstruction               0-007-012  04/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1 Aktor        8,750                  07/31/17   10/25/17    Aktor Corporation                   
 
18-0800   Reconstruction               0-007-014  01/24/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0538   Reconstruction               0-007-015  01/11/22  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0903MD Reconstruction               0-007-MD1  09/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1333SC Visual Structural Inspection 0-007-SC1  06/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
96-1136   Reconstruction               5-011-003  04/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1579   Reconstruction               5-011-004  11/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10              9,171                  01/08/03   01/13/04    Bette & Cring                       
                                                            2               3,691                  08/27/03   09/16/03    Bette & Cring                       
                                                            29              7,074                  03/25/05   04/15/05    Bette and Cring                     
                                                            30              3,256                  06/30/05   07/10/05    Bette Cring                         
                                                            9              14,883                  01/08/04   01/13/04    Bette & Cring                       
 
07-0437   Reconstruction               5-011-005  04/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-008             421                  03/27/09   04/23/09    RITCHIE BROTHERS, INC.              
                                                            2-008 A             0                  11/23/10   11/30/10    RITCHIE BROTHERS INC                
                                                            2-018          10,611                  07/17/09   08/18/09    RITCHIE BROTHERS INC                
                                                            2-018 F           693                  11/23/10   02/07/11    RITCHIE BROTHERS INC                
                                                            2-023 F         2,278                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-024 F         1,185                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            2-027 F           -96                  11/23/10   12/13/10    RITCHIE BROTHERS INC                
                                                            3-001          32,019                  08/26/08     /  /      Northern Mechanicals, Inc.          
                                                            4-001           3,423                  11/23/10   12/14/10    EMPIRE NORTHEAST INC                
                                                            4-004           2,539                  11/24/09   01/12/10    EMPIRE NORTHEAST INC                
                                                            5-003           2,003                  11/24/09   01/12/10    WATSON ELECTRIC INC                 
                                                            5-013             325                  11/23/10   12/14/10    WATSON ELECTRIC INC                 
                                                            6-001 F       -10,810                  11/23/10   12/14/10    GOUVERNEUR ROOFING                  
                                                            6-002          -1,394                  03/02/09   06/23/09    GOUVERNEUR ROOFING, SIDING & SHEET  
 
06-1664   Reconstruction               5-011-006  06/28/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
17-0743   Reconstruction               7-999-001  08/10/18  NO CHANGE ORDERS ON ELECTRONIC FILE

HAMMOND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-12-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Central School Main Bldg.:
93-1637   Reconstruction               0-001-003  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1409   Additions and Alterations    0-001-004  05/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1483   Additions and Alterations    0-001-005  08/29/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -217                  12/19/01     /  /      Collins-Hammond Elec.               
                                                            E-1              -217                  12/19/01   02/11/02    Collins-Hammond Elec.               
                                                            G-1            -2,665                  12/19/01   02/11/02    Harvey Excavation & Const.          
                                                            H-1             7,021                  02/19/02   04/01/02    THD Mech.                           
                                                            P-1             1,131                  12/10/01   03/01/02    Mourick Mech.                       
 
02-2238   Reconstruction               0-001-006  08/11/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           3,023                  05/11/05   06/14/05    HE Heath Electrical                 
                                                            GC-001          9,197                  10/15/04   10/27/04    Morley Bay Const.                   
                                                            GC-002          3,291                  02/07/05   02/24/05    Morley Bay Construction             
                                                            HC-001         83,424                  06/25/04   07/21/04    Northern Mech.                      
                                                            HC-002          7,713                  10/15/04   10/27/04    Northern Mech.                      
                                                            HC-003            940                  05/11/05   06/14/05    Northern Mechanical                 
                                                            Pc-01           2,460                  07/13/05   08/19/05    Norwood Plumbing                    
 
06-0605   Reconstruction               0-001-007  01/03/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           19,000                  07/05/07   07/17/07    PTL Contracting                     
                                                            2-01           16,000                  08/31/07   09/06/07    PTL CONTRACTING CORP.               
 
06-1341   Reconstruction               0-001-008  08/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -2,568                  09/03/08   01/29/09    CON TECH BUILDING SYSTEMS           
                                                            1-01            5,357                  03/23/10   06/01/10    DOW ELECTRIC                        
                                                            3-01           10,850                  02/11/08   03/08/08    Masonry & Renovations               
                                                            4-01           -5,097                  01/14/08   01/28/08    Wonder Star Construction            
 
08-1406   Reconstruction               0-001-009  06/25/09  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0658   Reconstruction               0-001-010  07/14/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1-01            4,950                  12/12/14   12/22/14    Continental Construction            
                                                            1-02             -838                  02/03/15   02/05/15    Continental Construction            
                                                            101-01              0                  11/06/15   12/02/15    Contiental Construction             
                                                            3-01          -39,315                  03/26/15   04/10/15    Norsworth Electric, LLC             
 
14-0588   Reconstruction               0-001-011  07/31/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            2-01           -8,509                  03/16/16   03/18/16    PASCO Building Automations Systems  
 
17-2039   Reconstruction               0-001-012  07/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1363   Reconstruction               0-001-013  03/04/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            3,100                  08/28/20   11/18/20    WHITTON CONSTRUCTION, LLC           
 
20-0760   Reconstruction               0-001-014  01/04/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           24,561                  06/14/21   03/15/22    Whitton Construction LLC            
 
20-1765   Reconstruction               0-001-015  07/16/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0242   Reconstruction               0-001-016  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1685   Reconstruction               0-001-017  07/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0018   Reconstruction               0-001-018  08/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0074FP Reconstruction               0-001-FP1  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
13-0780   Reconstruction               5-002-002  07/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE

HERMON-DEKALB CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-13-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          East DeKalb Building-Central School:
90-0626   Additions and Alterations    0-002-003  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1232   Reconstruction               0-002-005  05/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1522   Reconstruction               0-002-006  06/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1003   Reconstruction               0-002-007  05/31/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1750   Reconstruction               0-002-008  09/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1730   Reconstruction               0-002-009  06/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -44,631                  11/13/01   01/08/02    Avala Contracting                   
 
03-1530   Reconstruction               0-002-010  05/11/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1257   Reconstruction               0-002-011  09/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-10          14,107                  11/13/08   05/13/09    BETTE CRING CONSTRUCTION GROUP      
                                                            1-01            1,926                  07/16/08   09/29/08    B-S INDUSTRIAL CONTRACTORS, INC.    
                                                            1-01            4,500                  09/01/10   09/24/10    WJ FARLEY ROOFING CORPORATION       
                                                            1-02            6,528                  08/22/08   03/13/09    B-S INDUSTRIAL CONTRACTORS, INC.    
                                                            1-02            3,300                  09/01/10   09/24/10    WJ FARLEY ROOFING CORPORATION       
                                                            1-03          -11,537                  12/30/10   07/15/11    W.J. FARELY ROOFING CORPORATION     
                                                            2-01           15,603                  07/11/08   09/29/08    Bette & Cring, LLC                  
                                                            2-01          -15,000                  04/08/09   07/22/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-02           29,954                  07/11/08   09/29/08    Bette & Cring, LLC.                 
                                                            2-03           20,806                  08/07/08   10/21/08    BETTE & CRING, LLC                  
                                                            2-04           14,849                  08/07/08   10/21/08    BETTE & CRING, LLC                  
                                                            2-05            8,176                  08/07/08   10/21/08    BETTE & CRING, LLC                  
                                                            2-06            4,918                  10/24/08   03/09/09    BETTE & CRING, LLC                  
                                                            2-07          161,260                  10/24/08   03/09/09    BETTE & CRING, LLC                  
                                                            2-08           40,079                  10/24/08   03/09/09    BETTE & CRING, LLC                  
                                                            2-09           -6,739                  11/13/08   02/27/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-09            6,739                  01/05/09     /  /      BETTE CRING CONSTRUCTION GROUP      
                                                            2-11            5,119                  11/13/08   05/13/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-12            1,975                  11/13/08   05/08/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-13            4,072                  11/13/08   05/08/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-14           19,992                  11/13/08   05/08/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-15            4,101                  11/13/08   05/08/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-16           27,610                  12/15/08   01/22/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-17            4,886                  12/15/08   01/22/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-18           11,000                  12/15/08   01/22/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-19           57,637                  12/15/08   01/27/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-20            2,403                  12/15/08   01/27/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-21            2,703                  12/15/08   01/27/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-22            9,794                  01/23/09   03/05/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-23           10,106                  02/12/09   03/03/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-24           68,431                  04/08/09   07/21/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-25           12,100                  04/08/09   07/31/09    BETTE CRING CONSTRUCTION            
                                                            2-26            6,517                  04/08/09   07/31/09    BETTE CRING CONSTRUCTION            
                                                            2-27            4,074                  04/08/09   07/31/09    BETTE CRING CONSTRUCTION            
                                                            2-28          -17,591                  04/08/09   07/31/09    BETTE CRING CONSTRUCTION            
                                                            2-29           -2,300                  06/18/09   08/04/09    BETTE CRING CONSTRUCTION GROUP      
                                                            2-30           24,531                  12/21/09   02/09/10    BETTE CRING CONSTRUCTION GROUP      
                                                            3-01           49,335                  02/12/09   03/03/09    PTL CONTRACTING CORPORATION         
                                                            3-01          -26,325                  04/08/09   07/22/09    BETTE CRING CONSTRUCTION GROUP      
                                                            3-02            4,600                  11/17/08   04/13/09    PTL CONTRACTING CORP.               
                                                            3-03            7,000                  11/17/08   04/13/09    PTL CONTRACTING CORP                
                                                            3-04          154,972                  12/17/08   02/13/09    PTL CONTRACTING CORP                
                                                            4-01            1,568                  10/29/08   05/12/09    SKELLY CONTRACTING                  
                                                            4-02            1,399                  10/29/08   05/12/09    SKELLY CONTRACTING                  
                                                            4-03                0                  10/29/08   02/27/09    SKELLY CONTRACTING                  
                                                            4-04              526                  11/05/08   02/27/09    SKELLY CONTRACTING INC              
                                                            4-05           -1,142                  12/09/08   01/21/09    SKELLY CONTRACTING INC.             
                                                            4-06              731                  12/09/08   01/21/09    SKELLY CONTRACTING INC.             
                                                            4-06              731                  02/12/09   04/10/09    SKELLY CONTRACTING INC.             
                                                            4-07          169,454                  02/12/09   08/22/11    SKELLY CONTRACTING INC              
                                                            4-08           12,788                  03/04/09   06/24/09    SKELLY CONTRACTING INC.             
                                                            4-09            8,777                  12/22/09   02/04/10    SKELLY CONTRACTING INC              
                                                            5-01           -3,569                  08/07/08   07/08/09    EMPIRE NORTHEAST                    
                                                            5-02           35,561                  10/31/08   04/13/09    EMPIRE NORTHEAST                    
                                                            5-03            3,830                  10/31/08   02/26/09    EMPIRE NORTHEAST                    
                                                            5-04            1,260                  10/31/08   02/26/09    EMPIRE NOTHEAST                     
                                                            5-05            1,422                  10/31/08   05/12/09    EMPIRE NORTHEAST                    
                                                            5-06            5,712                  11/12/08   05/15/09    EMPIRE NORTHEAST                    
                                                            5-07              883                  11/12/08   05/15/09    EMPIRE NORTHEAST                    
                                                            5-08           -3,989                  06/18/09   08/04/09    EMPIRE N/E                          
                                                            6-01            9,019                  08/11/08   05/11/09    COLLINS - HAMMOND ELECTRICAL CONTRAC
                                                            6-02            3,847                  10/30/08   02/26/09    COLLINS-HAMMOND ELECTRICAL CONT.    
                                                            6-03            6,285                  10/30/08   02/26/09    COLLINS-HAMMOND ELECTRICAL CONT.    
                                                            6-04            1,656                  10/30/08   02/26/09    COLLINS-HAMMOND ELECTRICAL CONT.    
                                                            6-05           -1,989                  11/05/08     /  /      COLLON HAMMOND-ELECTRICAL CONTRACTOR
                                                            6-05            1,990                  01/05/09   02/25/09    COLLIN HAMMOND ELECTRICAL CONTRACTOR
                                                            6-06          -35,938                  11/05/08   04/14/09    COLLIN HAMMOND ELECTRICAL CONTRACTOR
                                                            6-07            2,992                  02/12/09   08/06/10    COLLIN HAMMOND ELECTRICAL CONTRACTOR
                                                            6-08              798                  02/12/09   04/10/09    COLLIN HAMMOND ELECTRICAL CONTRACTOR
                                                            BMR 4-01      -31,500                  04/08/09   07/22/09    BETTE CRING CONSTRUCTION GROUP      
                                                            CR6-01         -3,772                  04/08/09     /  /      BETTE CRING CONSTRUCTION GROUP      
                                                            FO 2-01        -4,115                  04/08/09     /  /      BETTE & CRING                       
                                                            MR #5-01      -10,720                  04/08/09     /  /      BETTE CRING CONSTRUCTION GROUP      
                                                            SA 8-01        -8,209                  04/08/09     /  /      BETTE CRING CONSTRUCTION GROUP      
 
16-0538   Reconstruction               0-002-012  02/09/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0361   Reconstruction               0-002-013  10/12/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001           2,000                  01/17/18   02/02/18    J.E.SHEEHAN CONTRACTING             
 
17-1272   Reconstruction               0-002-014  12/15/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0518   Reconstruction               0-002-015  02/20/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         20,985                  12/09/20   02/23/21    LAWMAN HEATING & COOLING            
                                                            EC-002         11,069                  10/21/21   12/06/22    Lawman Heat&Cool                    
                                                            EC-004          5,998                  11/18/21   12/15/22    Lawman Heat&Cool                    
                                                            EC-006         12,157                  05/18/22   04/04/23    Lawman Heat&Cool                    
                                                            GC-01         -58,017                  05/11/22   03/13/23    Northern Tier Contr Inc             
                                                            MC-01         -76,178                  05/11/22   03/13/23    Northern Mech Inc                   
                                                            PC-01          20,863                  05/11/22   03/13/23    JE Sheehan Contr Corp               
                                                            RC-01         -25,000                  05/11/22   03/13/23    Elmer Davis Inc                     
                                                            SC-01         -36,132                  05/11/22   05/09/23    Parker Excavation&Const             
 
22-0321   Reconstruction               0-002-016  01/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2342SC Visual Structural Inspection 0-002-SC1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0448SC Visual Structural Inspection 0-002-SC2  12/30/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Maint. Bldg.:
95-1004   Reconstruction               5-003-002  05/31/96  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0135   Reconstruction               5-003-003  08/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,174                  07/11/03   07/23/03    Total Tool                          
 
06-1258   Reconstruction               5-003-004  09/27/07  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0519   Additions and Alterations    5-003-005  02/20/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003          6,381                  10/21/21   12/06/22    Lawman Heat&Cool                    
                                                            EC-005         14,311                  05/18/22   04/04/23    Lawman Heat&Cool                    
 

LISBON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-16-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          School Building:
93-0434   Additions and Alterations    0-001-006  02/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0083   Reconstruction               0-001-007  09/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0084   Reconstruction               0-001-008  09/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0182   Additions and Alterations    0-001-010  01/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-2             2,737                  01/25/02   05/29/02    Collins-Hammond Elec.               
                                                            E-2             6,815                  07/17/02   08/16/02    Collins-Hammond Elec.               
                                                            H-2           -10,000                  01/13/03   01/23/03    Cardinal Construction NY            
                                                            P-1            28,527          19,149  07/12/04   10/28/04    JMS Mechanical Contractors          
                                                            P-2            21,424          11,166  07/12/04   10/28/04    JMS Mechanical Contractors          
                                                            P-3            19,340                  07/12/04   10/28/04    JMS Mechanical Contractors          
                                                            P-4            17,515                  07/12/04   07/15/04    JMS Mechanical Contractors          
                                                            S-1            61,168                  03/23/01   01/14/02    Fiacco and Riley Const.             
                                                            S-2            32,250                  03/19/02   04/19/02    Fiacco and Riley Const.             
 
98-1103   Additions and Alterations    0-001-011  05/10/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           -25,000                  03/20/03   04/17/03    Collin-Hammond Elec.                
 
01-0095   Additions and Alterations    0-001-012  12/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            4865/G-1       23,525                  12/20/02   04/08/03    H. Schickel Gen. Contracting        
                                                            4865/H-1       10,000                  03/14/03   03/19/03    Four-C-Aire                         
                                                            Aud-1           6,187                  12/22/03   12/29/03    Professional Furnishing and Equip.  
                                                            EC-1            2,803                  11/02/04   11/29/04    Collins Hammond Elec.               
                                                            G-2             7,784                  06/16/03   07/01/03    H. Schickel Gen. Contracting        
                                                            G-3            26,750          26,750  06/16/03   07/01/03    H. Schickel Gen. Contracting        
                                                            G-4             4,302                  09/09/03   09/19/03    H. Schickel Gen. Contracting        
                                                            G-5             7,747                  09/09/03   09/19/03    H. Schickel Gen. Contracting        
                                                            G-6           -22,116                  11/02/04   11/29/04    H. Schickel Gen. Contracting        
                                                            G-7           -13,552                  11/02/04   11/29/04    H. Schickel Gen. Contracting        
                                                            H-2             9,672                  08/31/04   09/17/04    Four C Aire                         
                                                            P-1           -19,456                  01/31/06   06/09/06    Norwood Plumbing                    
 
01-0096   Reconstruction               0-001-013  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0360   Reconstruction               0-001-014  02/24/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001          79,536                  09/14/09   10/07/09    Harvey Excavation & Construction inc
                                                            1-002           4,869                  09/14/09   10/07/09    Harvey Excavation & Construction    
                                                            1-002          -1,215                  12/16/10   01/13/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-003          14,364                  09/14/09   10/07/09    Harvey Excavation & Construction    
                                                            1-003          -1,293                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-004           4,918                  12/29/09   02/17/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            1-004          -1,574                  12/16/10   01/20/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-005          13,280                  01/12/10   02/22/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            1-005            -512                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-006           9,505                  01/25/10   04/30/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            1-006            -650                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-007           2,975                  01/27/10   03/05/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            1-007          -1,802                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-008            -818                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-009          -6,647                  12/16/10   02/11/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-01           -1,613                  12/16/10   01/13/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-010             461                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-011          -4,720                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-012          -3,067                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-013          -1,493                  12/16/10   01/07/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-08            8,546                  02/16/10   04/14/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            1-09            5,600                  03/26/10   05/10/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            1-10           17,185                  04/05/10   06/14/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            1-11            2,759                  11/05/10   11/17/10    HARVEY EXCAVATION & CONSTRUCTION INC
                                                            2-01               75                  01/20/10   03/04/10    Northern Mechanicals                
                                                            2-01           -1,850                  11/16/10   12/14/10    NORTHERN MECHANICALS INC            
                                                            2-02            1,414                  04/01/10   06/07/10    NORTHERN MECHANICALS INC            
                                                            2-02            3,150                  11/16/10   12/14/10    NORTHERN MECHANICALS                
                                                            2-03           20,947                  10/20/10   11/03/10    NORTHERN MECHANICALS INC            
                                                            2-04           17,748                  04/08/10   09/30/11    NORTHERN MECHANICALS INC            
                                                            2-05           16,968                  04/08/10   06/23/10    NORTHERN MECHANICALS INC            
                                                            3-001          -8,786                  11/16/10   12/14/10    HYDE STONE MECHANICAL CONTRACTOR    
                                                            3-01            9,110                  03/03/10   05/10/10    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            3-02           11,697                  03/03/10   05/10/10    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            3-03           -1,213                  05/07/10   08/04/10    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            4-01           -9,164                  10/07/09   04/12/12    Collins-Hammond Elec.               
                                                            4-01           -2,755                  11/16/10   11/22/10    COLLINS-HAMMOND ELECTRIC            
                                                            4-02           24,266                  10/06/09   04/12/12    Collins-Hammond Elec.               
                                                            4-02           -4,862                  11/16/10   11/22/10    COLLINS-HAMMOND ELECTRIC            
                                                            4-03            7,312                  10/06/09   04/12/12    Collins-Hammond Elec.               
                                                            4-03           -1,700                  11/16/10   11/22/10    COLLINS-HAMMOND ELECTRIC            
                                                            4-04           17,102                  10/13/09   11/09/09    COLLINS-HAMMOND ELEC                
                                                            4-04           -3,181                  11/16/10   11/22/10    COLLINS-HAMMOND ELECTRIC            
                                                            4-05            3,140                  11/09/09   01/04/10    COLLINS-HAMMOND ELECTRIC            
                                                            4-06           27,979                  11/18/09   12/08/09    COLLINS-HAMMOND ELECTRIC            
                                                            4-07            8,888                  12/22/09   02/08/10    COLLINS-HAMMOND ELECTRIC            
                                                            4-08            4,492                  12/22/09   02/08/10    COLLINS-HAMMOND ELECTRIC            
                                                            4-09            7,757                  01/10/11   02/11/11    COLLINS-HAMMOND ELECTRIC            
                                                            5-01          -88,862                  06/28/10   09/02/10    SANDS BROTHERS ROOFING COMPANY INC  
                                                            6-01           32,924                  10/13/09   11/09/09    TJ CONSTRUCTION                     
                                                            6-01           -8,084                  11/16/10   12/14/10    TJ CONSTRUCTION                     
                                                            6-02           -1,684                  11/16/10   11/22/10    TJ CONSTRUCTION                     
                                                            6-02           11,775                  06/28/11   07/18/11    TJ CONSTRUCTION                     
                                                            6-03          -10,163                  11/16/10   11/22/10    TJ CONSTRUCTION                     
                                                            6-03            7,650                  07/08/11   07/27/11    TJ CONSTRUCTION                     
 
09-1373   Reconstruction               0-001-015  05/27/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001           3,940                  11/16/10   01/03/11    CONTECH BUILDING SYSTEMS            
                                                            1-01           16,610                  09/17/10   09/28/10    CON TECH BUILDING SYSTEMS           
                                                            1-02           22,237                  10/28/10   12/02/10    CON TECH BUILDING SYSTEMS           
                                                            1-02           21,060                  11/16/10   12/01/10    CONTECH BUILDING SYSTEMS            
                                                            1-03            2,996                  10/28/10   12/02/10    CON TECH BUILDING SYSTEMS           
                                                            1-04           23,790                  01/10/11   05/25/11    CON TECH BUILDING SYSTEMS           
                                                            1-05            4,653                  01/10/11   05/25/11    CON TECH BUILDING SYSTEMS           
                                                            1-06           29,689                  07/26/11   09/21/11    CON TECH BUILDING SYSTEMS           
                                                            1-07           21,350                  11/03/11   01/06/12    CON TECH BUILDING SYSTEMS           
                                                            2-01          -15,000                  10/29/10   12/02/10    DAKOTA ENVIRONMENTAL SERVICES       
 
15-0669   Reconstruction               0-001-016  07/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          10,715                  02/21/18   03/07/18    DOW Electric Inc.                   
                                                            EC-02           3,051                  02/21/18   03/07/18    DOW Electric Inc.                   
                                                            EC-03           5,056                  05/09/18   05/10/18    DOW Electric Inc.                   
                                                            EC-04           2,600                  05/09/18   05/10/18    Dow Electric                        
                                                            GC-03          19,897                  02/21/18   02/28/18    Bette-Cring Construction            
                                                            GC-04          10,460                  02/21/18   02/28/18    Bette-Cring Construction            
                                                            GC-05          59,027                  03/26/18   03/29/18    Bette-Cring Construction            
                                                            GC-06             818                  05/09/18   06/01/18    Bette-Cring Construction            
                                                            MC-01         -11,829                  03/26/18   03/28/18    Northern Mechanical                 
 
16-2100   Reconstruction               0-001-017  04/10/17  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0836   Reconstruction               0-001-018  03/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1460   Reconstruction               0-001-019  06/14/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-47             798                  01/26/23   12/15/23    MURMANE BUILDING CONTRACTORS        
 

          Storage Building:
15-0670   New Construction             2-004-001  07/15/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Building:
15-0671   New Construction             7-005-001  07/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02           5,433                  03/26/18   03/29/18    Bette-Cring Construction            
 

MADRID WADDINGTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-19-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
94-1079   Reconstruction               0-003-003  04/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1608   Reconstruction               0-003-004  06/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0237   Additions and Alterations    0-003-005  02/11/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            11,625                  09/13/99   12/01/03    New Century Elec.                   
                                                            L-5             1,800                  11/06/01   01/08/02    Acts II Const.                      
                                                            P002            1,998                  09/08/99   12/01/03    Ashley Mech.                        
 
02-1639   Reconstruction               0-003-006  07/10/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0040   Additions and Alterations    0-003-007  12/31/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001            675                  06/09/04   06/14/04    Collins Hammond Elec.               
                                                            EC-002         -5,000                  02/18/05   03/02/05    Collin Hammond Electrical           
                                                            GC-001        -20,437                  02/18/05   03/02/05    Murnane Building                    
                                                            HC-001        -18,398                  05/27/04   06/07/04    Northern Mech.                      
                                                            HC-003        -10,000                  02/18/05   03/02/05    Northern Mechanical                 
                                                            SC-001          7,653                  06/09/04   06/14/04    Harvey Excavation Construction      
                                                            SC-002       -679,040                  08/22/05   08/25/05    Harvey Ecvavation and Construction  
 
07-0577   Additions and Alterations    0-003-008  02/29/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          14,745                  05/26/10   12/22/10    COLLINS-HAMMOND ELECT CONTRACTORS   
                                                            E-001          -4,472                  05/17/10   08/27/10    DOW ELECTRIC INC                    
                                                            E-002          21,004                  04/11/11   05/10/11    COLLINS-HAMMOND ELECTRICAL          
                                                            E-003          17,173                  04/11/11   05/10/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            G-001          19,036                  10/03/08   10/30/08    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            G-002          17,768                  06/24/09   08/18/09    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            G-003          16,138                  06/24/09   08/18/09    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            G-004          29,673                  02/17/10   05/26/10    HARVEY EXCAVATION AND CONST CO INC  
                                                            G-005           1,107                  02/17/10   05/26/10    HARVEY EXCAVATION AND CONST CO INC  
                                                            G-006           5,637                  05/17/10   08/27/10    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            H-001          -5,000                  05/17/10     /  /      SKELLY CONTRACTORS INC              
                                                            H001            2,846                  12/01/08   08/27/10    NORHTERN MECHANCIALS, INC.          
                                                            P-001         -15,941                  02/17/10   05/26/10    EMPIRE NORTHEAST INC                
                                                            R-001           4,899                  02/17/10   05/26/10    W.J. FARLEY ROOFING CORPORATION     
 
11-0733   Reconstruction               0-003-009  06/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001R         -7,533                  01/18/13   04/03/13    EMPIRE NORTHEAST INC                
 
13-1406   Reconstruction               0-003-010  04/22/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          4,299                  10/29/14   11/12/14    Gouverneur Roofing & Sheet Metal Co 
 
14-0466   Reconstruction               0-003-011  07/02/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  07/06/16   08/04/16    Watson Electric Inc.                
                                                            EC-02               0                  07/06/16   08/04/16    Watson Electric Inc.                
                                                            EC-03               0                  07/06/16   08/04/16    Watson Electrical Inc.              
                                                            EC-04           4,420                  07/06/16   08/04/16    Watson Electric Inc.                
                                                            EC-05          16,530                  07/06/16   08/01/16    Watson Electric Inc.                
                                                            EC-06          14,299                  07/06/16   08/01/16    Watson Electric Inc.                
                                                            EC-07           4,355                  07/06/16   08/01/16    Watson Electric Inc.                
                                                            EC-09           3,693                  07/06/16   08/01/16    Watson Electric Inc.                
                                                            EC-10           1,709                  07/06/16   08/01/16    Watson Electric Inc.                
                                                            EC-11          12,724                  07/06/16   08/01/16    Watson Electric Inc.                
                                                            EC-12           5,648                  11/02/16   12/13/16    Watson Electric, Inc.               
                                                            EC-13           2,206                  11/02/16   12/13/16    Watson Electric, Inc.               
                                                            EC-14           1,480                  11/02/16   12/13/16    Watson Electric, Inc.               
                                                            EC-15             153                  11/02/16   12/13/16    Watson Electric, Inc.               
                                                            EC-16             153                  11/02/16   12/13/16    Watson Electric, Inc.               
                                                            EC-17           5,768                  03/08/17   04/12/17    Watson Electric, Inc.               
                                                            EC-18           5,504                  03/08/17   04/13/17    Watson Electric, Inc.               
                                                            EC-19           4,262                  03/08/17   04/12/17    Watson Electric, Inc.               
                                                            EC-20           5,358                  03/08/17   04/13/17    Watson Electric, Inc.               
                                                            EC-21           3,424                  03/08/17   04/12/17    Watson Electric, Inc.               
                                                            EC-22           9,116                  03/08/17   04/12/17    Watson Electric, Inc.               
                                                            EC-23           1,169                  05/18/17   06/26/17    Watson Electric Inc                 
                                                            GC-02               0                  07/06/16   08/04/16    Bette-Cring Construction Co.        
                                                            GC-03               0                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-06          -1,143                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-08          13,262                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-10         -19,000                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-11          15,637                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-12           1,785                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-13          33,866                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-14             244                  07/06/16   08/04/16    Bette-Cring Construction Inc.       
                                                            GC-16          24,019                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-17             850                  11/02/16   12/13/16    Bette-Cring Construction Co.        
                                                            GC-18           6,738                  11/02/16   12/13/16    Bette-Cring Construction Co.        
                                                            GC-19           2,973                  11/02/16   12/13/16    Bette-Cring Construction Co.        
                                                            GC-21           6,539                  11/02/16   12/13/16    Bette-Cring Construction Co.        
                                                            GC-22          10,500                  11/02/16   12/13/16    Bette-Cring Construction Co.        
                                                            GC-23           2,363                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-24           2,629                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-25           4,455                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-26           2,737                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-27             623                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-28           2,385                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-29          -3,008                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            GC-30           2,300                  03/08/17   03/17/17    Bette-Cring Construction Co.        
                                                            MC-01               0                  07/06/16   08/01/16    Northern Mechanicals Inc.           
                                                            MC-02               0                  07/06/16   08/01/16    Northern Mechanicals Inc.           
                                                            MC-03               0                  03/08/17   04/12/17    Northern Mechanicals, Inc.          
                                                            MC-04               0                  03/08/17   04/12/17    Northern Mechanicals, Inc.          
                                                            MC-05          -4,000                  03/08/17   04/12/17    Northern Mechanicals, Inc.          
                                                            MC-06          -1,701                  03/08/17   04/12/17    Northern Mechanicals, Inc.          
                                                            PC-01               0                  03/08/17   04/12/17    Hydestone Mechanical Contractors    
                                                            PC-02           2,647                  03/08/17   04/12/17    Hydestone Mechanical Contractors    
 
16-0115   Reconstruction               0-003-012  01/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           6,005                  02/21/18   03/07/18    Watson Electric Inc.                
                                                            EC-02           6,476                  05/07/18   05/16/18    WATSON ELECTRIC                     
                                                            EC-03           6,850                  05/07/18   05/16/18    WATSON ELECTRIC                     
                                                            EC-04           6,399                  05/22/18   06/06/18    Watson Electric                     
                                                            GC-01           8,406                  02/21/18   02/28/18    Continental Construction LLC        
                                                            GC-02           4,769                  05/07/18   06/01/18    CONTINENTAL CONSTRUCTION LLC.       
                                                            GC-03          39,521                  05/07/18   06/01/18    CONTINENTAL CONSTRUCTION LLC.       
                                                            PC-01         -10,000                  03/26/18   03/28/18    Norwood Plumbing, Inc.              
                                                            PC-01         -10,000                  05/07/18   05/16/18    NORWOOD PLUMBING, INC.              
                                                            TC-01          -8,148                  08/16/18   09/20/18    TRANE BUILDING SERVICES             
 
16-1593   Reconstruction               0-003-013  06/28/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           8,174                  02/21/18   02/28/18    Continental Construction LLC        
 
17-1865   Reconstruction               0-003-014  06/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          17,171                  10/09/18   11/09/18    CONTINENTAL CONSTRUCTION LLC        
 
18-1929   Reconstruction               0-003-015  06/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          22,912                  11/21/19   12/18/19    CONTINENTAL CONSTRUCTION LLC        
 
19-1692   Reconstruction               0-003-016  07/13/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1827   Reconstruction               0-003-017  08/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0951   Reconstruction               0-003-018  04/07/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1968   Reconstruction               0-003-019  07/26/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           9,630                  06/28/23     /  /      WHITTON CONSTRUCTION                
 
22-2140   Reconstruction               0-003-020  07/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1184FP Reconstruction               0-003-FP1  02/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary Waddingto:
02-0424FP Reconstruction               0-004-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Metal Field Storage:
94-1080   New Construction             2-008-001  04/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE

           Bus Garage:
98-0238   Reconstruction               5-006-002  02/11/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0041   Reconstruction               5-006-003  12/31/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-002        -19,662                  05/27/04   06/07/04    Northern Mech.                      
 
07-0578   Reconstruction               5-006-004  02/29/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001           1,329                  05/17/10   08/27/10    HARVEY EXCAVATION & CONSTRUCTION CO 
 
11-0734   Reconstruction               5-006-005  06/11/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0467   Reconstruction               5-006-006  07/02/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-08             592                  07/06/16   08/04/16    Watson Electric Inc.                
                                                            EC-16             153                  11/02/16     /  /      Watson Electric, Inc.               
                                                            GC-01               0                  07/06/16   08/04/16    Bette-Cring Construction Co.        
                                                            GC-04               0                  07/06/16   08/04/16    Bette-Cring Construction Co.        
                                                            GC-05               0                  07/06/16   08/04/16    Bette-Cring Construction Co.        
                                                            GC-07               0                  07/06/16     /  /      Bette-Cring Construction co.        
                                                            GC-09           3,998                  07/06/16   08/04/16    Bette-Cring Construction Co.        
 
20-1642   Reconstruction               5-006-007  08/05/21  NO CHANGE ORDERS ON ELECTRONIC FILE

MASSENA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-20-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Jefferson Elementary:
98-0901   Additions and Alterations    0-001-004  05/07/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            17             34,615                  01/17/01   01/14/03    Syracuse Merit Elec.                
                                                            21             47,597                  01/17/01   01/14/03    Syracuse Merit                      
                                                            26                449                  05/23/02   05/29/02    Syracuse Merit                      
                                                            50             -4,160                  05/13/05   06/23/05    Welliver McGuire                    
                                                            53              8,041                  05/08/01   01/30/02    Syracuse Merit                      
                                                            67              2,656                  05/13/05   06/23/05    Syracuse Merit electric             
                                                            68              3,252                  05/13/05   06/23/05    Syracuse Merit electric             
                                                            80              5,000                  03/24/05   05/02/05    syraucse merit Electric Inc         
 
97-0329   Reconstruction               0-001-005  11/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1403   Reconstruction               0-001-007  06/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,476                  02/06/03   02/12/03    Danko Construction                  
                                                            11                451                  03/14/03   03/19/03    Danko Construction                  
                                                            2              11,560                  02/06/03   02/12/03    Danko Construction                  
 
06-1238   Additions and Alterations    0-001-008  08/07/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           10,853                  11/06/07   01/14/08    LVI ENVIRONMENTAL SERVICES          
                                                            1-01           18,480                  06/30/08   02/06/09    Murnane Building Contractors        
                                                            1-02            5,250                  12/09/08   02/13/09    MURNANE BUILDING CONTRACTORS        
                                                            1-06           10,475                  01/12/09   07/02/09    MURNANE BUILDING CONTRACTORS        
                                                            1-07            1,034                  03/05/09   05/26/09    MURNANE BUILDING CONTRACTORS        
                                                            1-08            4,777                  03/05/09   05/26/09    MURNANE BUILDING CONTRACTORS        
                                                            1-13           18,177                  03/06/09   06/25/09    MURNANE BUILDING CONTRACTORS        
                                                            1-15            3,244                  03/30/09   06/24/09    MURNANE BUILDING CONTRACTORS        
                                                            1-16            1,505                  04/20/09   08/04/09    MURNANE BUILDING CONTRACTORS        
                                                            1-17           16,775                  05/04/09   08/14/09    MURNANE BUILDING CONTRACTORS        
                                                            1-20            5,670                  05/26/09   08/14/09    MURNANE BUILDING CONTRACTORS        
                                                            1-25           25,510                  07/22/09   08/21/09    MURNANE BUILDING CONTRACTORS        
                                                            1-26           20,550                  07/22/09   08/21/09    MURNANE BUILDING CONTRACTORS        
                                                            1-27            5,500                  08/17/09   09/01/09    MURNANE BUILDING CONTRACTORS        
                                                            1-30           18,157                  11/09/09   12/28/09    MURNANE BUILDING CONTRACTORS        
                                                            1-31           12,378                  11/09/09   12/28/09    MURNANE BUILDING CONTRACTORS        
                                                            1-32            8,944                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-35            9,113                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-36            2,795                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-39            2,567                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-41           13,422                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-44            2,565                  01/22/10   02/23/10    MURNANE BUILDING CONTRACTORS        
                                                            1-51              627                  04/12/10   05/26/10    MURNANE BUILDING CONTRACTORS        
                                                            2-03            4,235                  11/24/10   12/16/10    NORTHERN MECHANICALS                
                                                            2-04           18,787                  09/29/09   11/13/09    NORTHERN MECHANICALS                
                                                            2-05            6,889                  11/09/09   02/26/10    NORTHERN MECHANICALS                
                                                            2-08            2,124                  12/20/10   01/13/11    NORTHERN MECHANICALS                
                                                            2-09             -422                  03/28/11   05/13/11    NORTHERN MECHANICALS                
                                                            3-04              227                  06/25/09   08/14/09    BURNS BROTHERS CONTRACTORS          
                                                            3-05           14,265                  12/07/09   01/08/10    BURNS BROTHERS CONTRACTORS          
                                                            3-06            1,211                  01/19/10   03/18/10    BURNS BROTHERS CONTRACTORS          
                                                            4-06              610                  02/19/10   04/13/10    COLLINS-HAMMOND ELECTRICAL          
                                                            4-10              414                  12/20/10   01/07/11    COLLINS-HAMMOND ELECTRICAL          
 
07-0557   Reconstruction               0-001-009  06/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1671   Reconstruction               0-001-010  06/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-03           -8,705                  04/22/10   01/07/11    NORTHERN MECHANICALS                
 
19-1306   Reconstruction               0-001-011  04/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-1             -874                  11/22/21   12/22/22    Dow Electric Inc                    
                                                            RC-5         -100,521                  02/08/21   04/14/21    ELMER W. DAVIS                      
                                                            SC-4           11,393                  12/13/21   01/23/23    Perras Excavating Inc               
 
20-1012   Reconstruction               0-001-012  03/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-3           -4,253                  09/29/22   12/06/23    Bette&Cring LLC                     
                                                            GC-6             -981                  11/14/22   12/07/23    BETTE & CRING LLC                   
                                                            PC-2           -1,054                  09/29/22   07/18/23    Norwood Plumb Inc                   
 

          Louisville ES (sold 2011):
91-0662   Reconstruction               0-003-003  02/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0451   Reconstruction               0-003-004  12/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1238   Reconstruction               0-003-005  05/25/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Madison Elementary:
93-0452   Reconstruction               0-004-004  12/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0902   Additions and Alterations    0-004-005  05/07/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            18             33,271                  01/17/01   01/14/03    Syracuse Merit                      
                                                            20             34,597                  01/17/01   01/14/03    Syracuse Merit                      
                                                            23              1,143                  05/23/02   05/29/02    Syracuse Merit                      
                                                            52              1,931                  05/08/01   01/30/02    Syracuse Merit                      
                                                            69                925                  05/13/05   06/23/05    Syracuse Merit electric             
                                                            70              1,908                  05/13/05   06/23/05    Syracuse Merit Electric             
                                                            77              1,732                  05/13/05   06/23/05    syracuse Merit Electric             
 
06-1239   Additions and Alterations    0-004-007  08/07/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-05            1,470                  12/03/08   04/03/09    MURNANE BUILDING CONTRACTORS        
                                                            1-10            6,930                  03/05/09   05/26/09    MURNANE BUILDING CONTRACTORS        
                                                            1-14            1,724                  03/16/09   05/27/09    MURNANE BUILDING CONTRACTORS        
                                                            1-19            6,625                  05/04/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            1-21            2,062                  05/26/09   08/14/09    MURNANE BUILDING CONTRACTORS        
                                                            1-24            1,050                  07/22/09   08/21/09    MURNANE BUILDING CONTRACTORS        
                                                            1-28             -615                  07/23/09   08/07/09    MURNANE BUILDING CONTRACTORS        
                                                            1-33            4,708                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-40            2,762                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-45             -153                  01/22/10   02/23/10    MURNANE BUILDING CONTRACTORS        
                                                            1-48            1,056                  03/01/10   04/30/10    MURNANE BUILDING CONTRACTORS        
                                                            1-49              564                  04/08/10   06/16/10    MURNANE BUILDING CONTRACTORS        
                                                            1-53            5,148                  10/27/10   11/16/10    MURNANE BUILDING CONTRACTORS        
                                                            1-54              -24                  02/11/11   03/01/11    MURNANE BUILDING CONTRACTORS        
                                                            2-01                0                  02/03/09   03/11/09    NORTHERN MECHANICALS                
                                                            2-07              994                  11/12/09   12/08/09    NORTHERN MECHANICALS                
                                                            3-01           12,974                  05/27/08   08/08/08    Burns Brothers contractors          
                                                            3-02           11,280                  02/17/09   04/03/09    BURNS BROTHERS CONTRACOTRS          
                                                            3-08              574                  01/22/10   02/23/10    BURNS BROTHERS CONTRACTORS          
                                                            4-01                0                  02/24/09   04/03/09    COLLINS-HAMMOND ELECTRICAL          
                                                            4-04            2,130                  11/23/09   12/30/09    COLLINS-HAMMOND ELECTRICAL          
                                                            4-07              610                  02/19/10   04/13/10    COLLINS-HAMMOND ELECTRICAL          
                                                            4-12            1,783                  12/20/10   01/07/11    COLLINS-HAMMOND ELECTRICAL          
                                                            5-01           63,239                  09/05/08   12/01/08    RSI ROOIFING INC.                   
 
08-1672   Reconstruction               0-004-008  06/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -25,068                  03/23/10   08/06/10    NORTHERN MECHANICALS                
                                                            1-01           -8,248                  04/22/10   01/07/11    NORTHERN MECHANICALS                
                                                            1-01                0                  01/05/15   01/13/15    Nothern Mechanicals, Inc.           
 
19-1307   Reconstruction               0-004-009  04/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1           -3,165                  10/22/21   12/06/22    AAC Contracting                     
                                                            RC-1         -673,367                  02/08/21   03/19/21    ELMER W. DAVIS                      
                                                            SC-1           22,350                  10/22/21   12/06/22    Perras Excavating, Inc              
                                                            SC-2           24,071                  12/13/21   01/23/23    Perras Excating Inc                 
 
20-1013   Reconstruction               0-004-010  03/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1           17,319                  07/18/22   05/10/23    NRC East Environ Servs Inc          
                                                            AA-3            2,839                  02/24/23   12/14/23    NRC EAST ENVIRONMENTAL SERVICES INC 
                                                            GC-1           -3,243                  09/29/22   12/15/23    Bette&Cring LLC                     
                                                            GC-12             462                  02/24/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-4            7,267                  10/31/22   12/13/23    Bette & Cring LLC                   
                                                            GC-7            1,702                  11/14/22   12/07/23    BETTE & CRING LLC                   
                                                            GC-9            3,196                  02/24/23   12/15/23    BETTE & CRING LLC                   
                                                            PC-1              578                  09/29/22   07/18/23    Norwood Plumb Inc                   
                                                            PC-5            4,388                  11/14/22   07/27/23    NORWOOD PLUMBING INC                
 

          Nightengale Elementary:
98-0903   Additions and Alterations    0-005-004  05/07/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            16             35,366                  01/17/01   01/14/03    Syracuse Merit                      
                                                            19             45,201                  01/17/01   01/14/03    Syracuse Merit                      
                                                            23               -139                  05/13/05   06/23/05    Skelly Contractors                  
                                                            24              1,040                  05/23/02   05/29/02    Syracuse Merit                      
                                                            54              1,716                  05/08/01   01/30/02    Syracuse Merit                      
                                                            73                669                  05/13/05   06/23/05    Syracuse Merit Electric             
                                                            74              1,908                  05/13/05   06/23/05    Syracuse Merit Electric             
 
97-0452   Reconstruction               0-005-005  11/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0286   Reconstruction               0-005-007  10/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1240   Additions and Alterations    0-005-008  08/07/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-03            5,460                  12/09/08   02/12/09    MURNANE BUILDING CONTRACTORS        
                                                            1-04            1,470                  12/03/08   04/03/09    MURNANE BUILDING CONTRACTORS        
                                                            1-11            6,930                  03/05/09   05/26/09    MURNANE BUILDING CONTRACTORS        
                                                            1-12            1,990                  03/06/09   06/25/09    MURNANE BUILDING CONTRACTORS        
                                                            1-18            6,625                  05/04/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            1-22            9,682                  07/03/09   08/28/09    MURNANE BUILDING CONTRACTORS        
                                                            1-23            1,050                  07/22/09   08/21/09    MURNANE BUILDING CONTRACTORS        
                                                            1-29            4,053                  10/06/09   11/19/09    MURNANE BUILDING CONTRACTORS        
                                                            1-34            9,963                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-38            2,097                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-43              654                  01/22/10   02/23/10    MURNANE BUILDING CONTRACTORS        
                                                            1-47            1,056                  03/01/10   04/30/10    MURNANE BUILDING CONTRACTORS        
                                                            1-50             -273                  04/08/10   06/16/10    MURNANE BUILDING CONTRACTORS        
                                                            1-52            7,392                  10/27/10   11/16/10    MURNANE BUILDING CONTRACTORS        
                                                            2-02                0                  02/03/09   03/11/09    NORTHERN MECHANICALS                
                                                            3-03           11,280                  02/17/09   04/03/09    BURNS BROTHERS CONTRACTORS          
                                                            3-07              592                  01/22/10   02/23/10    BURNS BROTHERS CONTRACTORS          
                                                            4-02                0                  02/24/09   04/03/09    COLLINS-HAMMOND ELECTRICAL          
                                                            4-03            2,092                  11/23/09   12/17/09    COLLINS-HAMMOND ELECTRICAL          
                                                            4-08              610                  02/19/10   04/13/10    COLLINS-HAMMOND ELECTRICAL          
                                                            4-11              625                  12/20/10   01/07/11    COLLINS-HAMMOND ELECTRICAL          
                                                            5-02           31,619                  09/05/08   12/01/08    RSI ROOFING INC.                    
                                                            5-03          -20,790                  10/06/09   11/19/09    RSI ROOFING                         
 
08-1673   Reconstruction               0-005-009  06/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02           -8,114                  04/22/10   01/07/11    NORTHERN MECHANICALS                
                                                            1-02                0                  01/05/15   01/13/15    Northern Mechanicals, Inc.          
 
10-0779   Reconstruction               0-005-010  03/22/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-02           -1,490                  02/11/13   05/03/13    DOW ELECTRIC INC                    
                                                            3-03           35,364                  09/19/11   12/29/11    ACTS II CONSTRUCTION                
                                                            3-04                0                  01/05/15   01/08/15    Acts II Construction Inc.           
                                                            3-05                0                  01/05/15   01/08/15    Acts II Construction Inc.           
                                                            3-07           20,076                  09/19/11   12/29/11    Acts II Construction                
                                                            3-08           18,520                  11/21/11   03/30/12    ACTS II CONSTRUCTION                
                                                            3-11           -1,490                  08/07/12   11/28/12    Act II Construction                 
                                                            4-01           -3,000                  10/27/11   01/24/12    LVI ENVIRONMENTAL SERVICES          
 
19-1308   Reconstruction               0-005-011  04/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-3           14,686                  12/17/21   01/10/23    DOW ELECTRIC                        
                                                            RC-2       -1,143,006                  02/08/21   03/19/21    ELMER W. DAVIS                      
 
20-1014   Reconstruction               0-005-012  03/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-2           18,109                  07/18/22   05/10/23    NRC East Environmental Servs Inc    
                                                            GC-10           3,196                  02/24/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-11           5,216                  02/24/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-13             462                  02/24/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-2          -11,207                  09/29/22   12/06/23    Bette&Cring LLC                     
                                                            GC-5            1,673                  10/31/22   12/14/23    Bette &Cring LLC                    
                                                            GC-8            2,832                  11/14/22   12/07/23    BETTE & CRING LLC                   
                                                            MC-1         -165,793                  04/10/23   12/27/23    NORTHERN MECHANICALS                
                                                            PC-3              601                  09/29/22   07/18/23    Norwood Plumb Inc                   
                                                            PC-4            7,025                  10/31/22   11/15/23    Norwood Plumb Inc                   
                                                            PC-6            8,634                  11/14/22   07/27/23    NORWOOD PLUMBING INC                
                                                            PC-7            1,047                  02/27/23     /  /      NORWOOD PLUMB INC                   
 

          Massena Senior High:
91-0663   Reconstruction               0-008-002  02/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0904   Additions and Alterations    0-008-003  05/07/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              31,295                  02/19/02   04/04/02    Welliver McGuire                    
                                                            13              9,603                  11/29/00   02/09/01    Syracuse Merit Electric             
                                                            16              5,445                  07/13/00   12/02/03    Lawman Heating                      
                                                            18             17,000                  05/13/05   06/23/05    Lawman Heating Cooling              
                                                            20             -2,000                  11/20/01   05/28/02    Lawman Heating                      
                                                            22             21,498                  01/17/01   01/14/03    Syracuse Merit                      
                                                            28              2,867                  05/23/02   05/29/02    Syracuse Merit                      
                                                            29                588                  05/23/02   05/29/02    Syracuse Merit                      
                                                            49              1,271                  05/08/01   01/30/02    Syracuse Merit                      
                                                            50              9,317                  05/05/01   01/30/02    Syracuse Merit                      
                                                            58                721                  05/08/01   01/30/02    Syracuse Merit                      
                                                            59              9,689                  08/29/01   01/29/02    Syracuse Merit                      
                                                            60              1,899                  05/08/01   01/30/02    Syracuse Merit                      
                                                            65             12,746                  05/13/05   06/23/05    syracuse Merit Electric             
                                                            66             15,602                  05/13/05   06/23/05    Syracuse Merit Electric             
                                                            72              8,737                  05/13/05   06/23/05    Syracuse Merit Electric             
                                                            75             12,800                  05/13/05   06/23/05    Syracuse Merit Electric             
                                                            76              1,732                  05/13/05   06/23/05    Syracuse Merit Electric             
                                                            78              1,663                  05/13/05   06/23/05    syracuse Merit Electric             
 
01-1404   Reconstruction               0-008-005  06/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,216                  01/30/03   02/11/03    Jordstat Const.                     
                                                            1               3,374                  06/04/03   06/10/03    Norwood Plumbing                    
                                                            10                492                  03/14/03   03/19/03    Danko Const.                        
                                                            12              7,948                  03/14/03   03/19/03    Danko Const.                        
                                                            13              2,216                  03/14/03   03/19/03    Danko Const.                        
                                                            14              3,384                  03/14/03   03/19/03    Danko Const.                        
                                                            15              3,960                  05/19/03   06/02/03    Danko Const.                        
                                                            16              3,142                  05/19/03   06/02/03    Danko Const.                        
                                                            2              -2,217                  06/04/03   06/10/03    Norwood Plumbing                    
                                                            3               2,588                  02/06/03   02/12/03    Danko Const.                        
                                                            4               1,680                  02/06/03   02/12/03    Danko Const.                        
                                                            5               3,465                  02/06/03   02/12/03    Danko Const.                        
                                                            6                 600                  02/06/03   02/12/03    Danko Const.                        
                                                            7              -3,446                  03/14/03   03/19/03    Danko Const.                        
                                                            8              -1,056                  03/14/03   03/19/03    Danko Const.                        
                                                            9              -4,350                  03/14/03   03/19/03    Danko Const.                        
 
05-1239   Reconstruction               0-008-006  05/25/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1052   Additions and Alterations    0-008-007  07/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10-001          4,756                  09/14/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            10-02           9,713                  09/14/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            10-03          26,555                  09/14/09   10/20/09    MURNANE BUILDING CONTRACTORS        
                                                            10-04          16,297                  11/17/09   12/31/09    MURNANE BUILDING CONTRACTORS        
                                                            10-05          70,738                  11/17/09   12/31/09    MURNANE BUILDING CONTRACTORS        
                                                            10-06           6,856                  02/04/10   04/14/10    MURNANE BUILDING CONTRACTORS        
                                                            10-07           7,927                  02/19/10   03/30/10    MURNANE BUILDING CONTRACTORS        
                                                            10-08           8,265                  02/19/10   03/30/10    MURNANE BUILDING CONTRACTORS        
                                                            10-09           6,860                  03/22/10   05/14/10    MURNANE BUILDING CONTRACTORS        
                                                            10-10           4,360                  03/22/10   05/14/10    MURNANE BUILDING CONTRACTORS        
                                                            10-11          22,109                  05/03/10   07/15/10    MURNANE BUILDING CONTRACTORS        
                                                            10-12           5,122                  08/17/10   09/28/10    MURNANE BUILDING CONTRACTORS        
                                                            11-01           3,256                  09/03/09   09/21/09    NORTHERN MECHANICAL                 
                                                            11-02           4,319                  10/23/09   12/08/09    NORTHERN MECHANICALS                
                                                            11-03           2,499                  10/23/09   11/30/09    NORTHERN MECHANICALS                
                                                            11-04           7,198                  11/09/09   01/04/10    NORTHERN MECHANICALS                
                                                            11-05          12,496                  11/09/09   01/04/10    NORTHERN MECHANICALS                
                                                            11-06           7,679                  12/07/09   01/19/10    NORTHERN MECHANICALS                
                                                            11-08          20,800                  04/12/10   05/26/10    NORTHERN MECHANICALS                
                                                            11-09            -837                  03/22/10   05/14/10    NORTHERN MECHANICALS                
                                                            11-09           7,198                  04/12/10   05/26/10    NORTHERN MECHANICALS                
                                                            11-10           2,293                  11/17/10   11/22/10    NORTHERN MECHANICALS                
                                                            12-01          33,700                  03/16/11   06/20/11    NORWOOD PLUMBING INC                
                                                            12-02            -837                  03/22/10   05/14/10    NORWOOD PLUMBING INC                
                                                            12-03             883                  05/21/10   08/04/10    NORWOOD PLUMBING INC                
                                                            12-04           2,136                  02/16/11   03/03/11    NORWOOD PLUMBING INC                
                                                            13-01          15,752                  09/03/09   09/21/09    COLLINS-HAMMOND ELECTRICAL          
                                                            13-02           1,935                  10/23/09   11/30/09    COLLINS-HAMMOND ELECTRICAL          
                                                            13-03          12,409                  02/19/10   03/30/10    COLLINS-HAMMOND ELECTRICAL          
                                                            13-04            -837                  04/02/10   06/14/10    COLLINS-HAMMOND ELECTRICAL          
                                                            13-05           9,024                  11/03/10   11/16/10    COLLINS-HAMMOND ELECTRICAL          
                                                            13-06           8,467                  11/03/10   11/16/10    COLLINS-HAMMOND ELECTRICAL          
                                                            13-07           7,329                  12/20/10   01/20/11    COLLINS-HAMMOND ELECTRICAL          
                                                            13-08             670                  12/20/10   01/20/11    COLLINS-HAMMOND ELECTRICAL          
                                                            13-09           3,873                  12/20/10   01/20/11    COLLINS-HAMMOND ELECTRICAL          
                                                            13-10           1,104                  03/28/11   05/13/11    COLLINS-HAMMOND ELECTRICAL          
                                                            14-01               0                  03/16/09   04/17/09    J.E. SHEEHAN CONTRACTING            
                                                            14-02          31,315                  09/14/09   10/09/09    J.E. SHEEHAN CONTRACTING            
                                                            14-03          23,103                  09/23/09   10/19/09    J.E. SHEEHAN CONTRACTING            
                                                            14-04          31,566                  09/23/09   10/19/09    J.E. SHEEHAN CONTRACTING            
                                                            14-05          68,428                  09/29/09   11/17/09    J.E. SHEEHAN CONTRACTING            
                                                            14-06          14,029                  11/05/09   01/12/10    J.E. SHEEHAN                        
                                                            14-07          42,003                  11/05/09   01/12/10    J.E. SHEEHAN CONTRACTING            
                                                            14-08          16,592                  12/21/09   02/09/10    J.E. SHEEHAN CONTRACTING            
 
06-1644   Reconstruction               0-008-008  06/22/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            3,000                  10/06/08     /  /      LVI Environmental Services          
                                                            1-02           -4,700                  11/09/07   01/14/08    LVI Environmental                   
                                                            1-03         -628,695                  11/09/07   01/14/08    LVI Environmental                   
 
08-1126   Reconstruction               0-008-009  03/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1-001           3,346                  06/07/10   07/28/10    CONTECH BUILDING SYSTEMS            
                                                            1-001               0                  11/18/10   11/22/10    CON TECH BUILDING SYSTEMS INC       
                                                            1-002               0                  11/18/10   11/22/10    CON TECH BUILDING SYSTEMS INC       
                                                            1-02             -104                  11/10/10   11/16/10    CONTECH BUILDING SYSTEMS            
                                                            2-01           -7,655                  11/04/10   11/09/10    NORWOOD PLUMBING INC                
                                                            3-001         -15,073                  03/22/11   04/08/11    COLLINS HAMMOND ELECTRICAL CONT.    
                                                            3-01                0                  01/02/15   01/08/15    Collins Hammond                     
                                                            4-001           1,504                  07/15/10   09/03/10    GOUVERNEUR ROOFING & SHEET METAL    
                                                            4-02            6,188                  11/12/10   11/16/10    GOUVERNEUR ROOFING & SHEET METAL    
                                                            FD 4-01             0                  11/18/10   11/22/10    GOUVERNEUR ROOFING SIDING & SHEET   
                                                            FD 4-02             0                  11/18/10   11/22/10    GOUVERNEUR ROOFING SIDING & SHEET   
                                                            FD 4-03             0                  11/18/10   11/22/10    GOUVERNEUR ROOFING SIDING & SHEET   
                                                            FD 4-04             0                  11/18/10   11/22/10    GOURNERNEUR ROOFING SIDING & SHEET  
                                                            FD 4-05             0                  11/18/10   11/22/10    GOUVERNEUR ROOFING SIDING & SHEET   
                                                            FO 2-01             0                  11/18/10   11/22/10    NORWOOD PLUMBING INC                
 
09-0832   Reconstruction               0-008-011  09/27/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0025   Reconstruction               0-008-012  08/20/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -13,934                  11/03/10   11/12/10    LORAN CONSTRUCTION INC              
                                                            2-01             -920                  11/03/10   11/12/10    LVI ENVIRONMENTAL SERVICES          
 
09-0899   Reconstruction               0-008-013  05/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1045   Reconstruction               0-008-014  07/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001          26,542                  10/27/10   11/16/10    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-002          13,277                  03/22/11   05/10/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-01          -10,000                  12/02/11   07/17/12    EMPIRE NORTHEAST INC                
                                                            2-01            4,859                  03/28/11   05/13/11    NORWOOD PLUMBING INC                
                                                            2-01                0                  05/24/13   07/16/13    Norwood Plumbing, Inc.              
                                                            2-02             -491                  06/06/11   07/13/11    NORWOOD PLUMBING INC                
                                                            FO1-001             0                  05/24/13   07/16/13    Harvey Excavation & Construction    
                                                            FO1-002             0                  05/24/13   07/16/13    Harvey Excavation & Construction    
                                                            FO1-003             0                  05/24/13   07/16/13    Harvey Excvation & Construction     
 
10-0780   Reconstruction               0-008-015  03/22/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001           4,399                  07/20/11   09/02/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-02           -2,500                  02/27/12   09/28/12    HARVEY EXCAVATION & CONSTRUCTION    
                                                            2-01            3,650                  12/05/11   03/30/12    DOW ELECTRIC INC                    
                                                            3-01                0                  06/06/11   07/13/11    ACTS II CONSTRUCTION INC            
                                                            3-01           20,999                  07/26/11   09/02/11    ACTS II CONSTRUCTION                
                                                            3-01                0                  01/05/15   01/08/15    Acts II Construction, Inc.          
                                                            3-02           33,672                  09/19/11   12/29/11    ACTS II CONSTRUCTION                
                                                            3-02                0                  01/05/15   01/08/15    ACTS II Construction Inc.           
                                                            3-03                0                  01/05/15   01/08/15    Acts II Construction Inc.           
                                                            3-04           14,988                  09/19/11   12/29/11    ACTS II CONSTRUCTION                
                                                            3-05           15,511                  09/19/11   12/29/11    ACTS II CONSTRUCTION                
                                                            3-06           15,047                  09/19/11   12/29/11    ACTS II CONSTRUCTION                
                                                            3-09           13,734                  11/21/11   03/30/12    ACTS II CONSTRUCTION                
                                                            3-10           20,787                  11/21/11   03/30/12    ACTS II CONSTRUCTION                
                                                            3-12           20,927                  07/25/12   01/24/13    ACTS II CONSTRUCTION                
                                                            3-13          -38,000                  12/07/12   03/14/13    ACTS II CONSTRUCTION                
 
11-1441   Reconstruction               0-008-016  07/01/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1 - 01         -1,397                  10/15/13   06/28/13    Skelly Contractors, Inc.            
                                                            100-01              0                  10/15/12   06/28/13    Skelly Contractors                  
 
18-0155   Reconstruction               0-008-018  08/27/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GEN-01         -8,200                  01/29/19   02/25/19    CONTINENTAL CONSTRUCTION, LLC       
                                                            GEN-02         -4,000                  06/11/19   06/12/19    CONTINENTAL CONSTRUCTION, LLC       
 
19-1309   Reconstruction               0-008-019  04/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            3,983                  12/13/21   09/27/22    Perras Const Services Inc           
                                                            RC-3         -116,947                  02/08/21   03/19/21    ELMER W. DAVIS                      
                                                            RC1-2         -16,410                  06/09/22   05/09/23    A.W. Farrell&Son Inc                
                                                            SC-5            1,443                  12/13/21   01/23/23    Perras Excavating Inc               
 
20-1015   Reconstruction               0-008-020  03/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-1           14,610                  10/31/22   12/13/23    AJK Site Development Inc            
                                                            SC-2            7,731                  10/31/22   12/13/23    AJK Site Development Inc            
                                                            SC-3           -1,646                  03/20/23   12/19/23    AJK SITE DEVELOPMENT INC            
 
20-1951   Reconstruction               0-008-021  11/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1813   Reconstruction               0-008-022  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Twin River Elem:
91-0664   Reconstruction               0-011-001  02/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0453   Reconstruction               0-011-002  12/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          J.W. Leary Junior High School:
91-0665   Reconstruction               0-012-002  02/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0905   Additions and Alterations    0-012-003  05/07/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            25                613                  05/23/02   05/29/02    Syracuse Merit                      
                                                            27              1,073                  05/23/02   05/29/02    Syracuse Merit                      
                                                            51              1,728                  05/08/01   01/30/02    Syracuse Merit                      
                                                            71              4,924                  05/13/05   06/23/05    Syracuse Merit Electric             
                                                            81            -55,000                  09/20/01   01/14/02    Welliver McGuire                    
                                                            82              1,262                  10/15/01   05/22/02    Welliver McGuire                    
                                                            83              3,566                  10/15/01   05/22/02    Welliver McGuire                    
                                                            84            -21,939                  10/15/01   05/22/02    Welliver McGuire                    
                                                            85                778                  10/25/01   05/22/02    Welliver McGuire                    
                                                            86             45,000                  01/03/02   05/28/02    Welliver McGuire                    
 
97-0330   Reconstruction               0-012-004  11/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0287   Reconstruction               0-012-005  10/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1241   Additions and Alterations    0-012-006  08/07/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-37              890                  11/09/09   02/26/10    MURNANE BUILDING CONTRACTORS        
                                                            1-42            1,496                  01/22/10   02/23/10    MURNANE BUILDING CONTRACTORS        
                                                            1-46              646                  03/01/10   04/30/10    MURNANE BUILDING CONTRACTORS        
                                                            2-06           25,599                  11/09/09   02/26/10    NORTHERN MECHANICALS                
                                                            4-05            1,357                  11/23/09   12/30/09    COLLINS-HAMMOND ELECTRICAL          
                                                            4-09            3,735                  12/20/10   01/07/11    COLLINS-HAMMOND ELECTRICAL          
 
05-1252   Reconstruction               0-012-007  05/25/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          291,700                  08/22/06     /  /      Monahan Loughlin                    
                                                            1-01                0                  12/05/06   01/09/07    PTL Contracting                     
                                                            1-02           -4,400                  06/28/07   07/17/07    PTL Contracting                     
 
09-1046   Reconstruction               0-012-008  12/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01                0                  01/05/15   01/13/15    Northern Mechanicals, Inc.          
                                                            1-02           -4,532                  05/12/11   07/13/11    NORTHERN MECHANICALS                
                                                            1-02                0                  01/05/15   01/13/15    Northern Mechanicals, Inc.          
                                                            1-03          -14,671                  12/08/11   07/17/12    NORTHERN MECHANICALS                
                                                            1-04                0                  01/05/15   01/13/15    Nothern Mechanicals, Inc.           
                                                            2-01           -2,500                  09/17/12   06/28/13    DOW ELECTRIC                        
 
15-0017   Reconstruction               0-012-009  07/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1713   Reconstruction               0-012-010  05/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -8,000                  05/17/17   05/18/17    Northern Tier Contracting, Inc.     
 
19-1310   Reconstruction               0-012-011  04/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-4         -105,047                  02/08/21   04/14/21    ELMER W. DAVIS                      
                                                            RC1-3          -7,658                  06/09/22   05/09/23    AW Farrell & Son Inc                
 
20-1952   Reconstruction               0-012-012  11/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cent Admin Bldg (fmly Bus Gar/Maint):
91-0666   Reconstruction               5-006-003  02/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1730   Reconstruction               5-006-005  03/10/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1317   Additions and Alterations    5-006-006  08/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6-01           26,800                  03/20/08   04/21/08    Murnane Building Contractors        
                                                            6-02            3,706                  06/30/08   08/27/08    Murnane Building Contractors        
                                                            6-03            2,625                  09/25/08   05/12/09    MURNANE BUILDING CONTRACTORS        
                                                            6-04            1,505                  12/06/08   03/18/09    MURNANE BUILDING CONTRACTORS        
                                                            6-05              983                  12/06/08   03/18/09    MURNANE BUILDING CONTRACTORS        
                                                            7-01           -1,655                  10/14/08   01/24/13    B-S INDUSTRIAL CONTRACTORS INC      
                                                            8-01           -5,000                  12/03/08   04/14/09    Hyde-Stone Mechanical Contractors   
                                                            9-01           -5,123                  05/02/08   08/12/08    EMPIRE NORTHEAST                    
                                                            9-02           18,966                  10/29/08   01/24/13    EMPIRE NORTHEAST                    
                                                            9-03           10,582                  06/20/08   08/23/12    Empire Northeast                    
                                                            9-04            6,721                  08/06/08   05/11/09    EMPIRE NORTHEAST                    
                                                            9-05            5,302                  10/17/08   02/26/09    EMPIRE NORTHEAST                    
 
07-1606   Reconstruction               5-006-007  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -8,173                  08/20/08   02/06/09    GOVERNEUR ROOFING                   
 
09-0002   Reconstruction               5-006-008  07/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01             -270                  03/08/10   05/25/10    MURNANE BUILDING CONTRACTORS        
                                                            1-01           -2,878                  02/23/11   03/18/11    MURNANE BUILDING CONTRACTORS        
                                                            1-02             -580                  02/23/11   03/18/11    MURNANE BUILDING CONTRACTORS        
                                                            1-03           -3,321                  02/23/11   03/18/11    MURNANE BUILDING CONTRACTORS        
                                                            1-04             -450                  02/23/11   03/18/11    MURNANE BUILDING CONTRACTORS        
                                                            2-01           -7,091                  03/22/10   06/14/10    BURNS BROTHERS CONTRACTORS          
                                                            2-01             -408                  02/23/11   03/18/11    BURNS BROTHERS CONTRACTORS INC      
 
09-1047   Reconstruction               5-006-009  12/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            6,921                  05/12/11   07/13/11    NORTHERN MECHANICALS                
                                                            1-03                0                  01/05/15   01/13/15    Northern Mechanicals, Inc.          
 
16-2158   Reconstruction               5-006-012  11/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -308                  06/28/18   08/06/18    Northern Tier Contracting, Inc.     
                                                            EC-1           -2,000                  06/28/18   07/24/18    WATSON ELECTRIC                     
 
19-1311   Reconstruction               5-006-013  04/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1953   Reconstruction               5-006-014  11/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Trans. Fac./Fuel Depot:
01-0052   New Construction             5-019-001  01/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1                   0                  02/06/03   02/13/03    J.Hutchins Const.                   
                                                            1                   0                  02/06/03   02/13/03    Four-C-Air                          
                                                            1                   0                  02/10/03   02/14/03    Collins-Hammond Elec.               
                                                            1                   0                  04/25/03   05/07/03    Norwood Plumbing                    
                                                            10               -441                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            11               -606                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            12              1,824                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            13              3,600                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            14              3,465                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            15              3,288                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            16                859                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            17              2,883                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            18             25,000                  08/20/03   08/27/03    St. Paul Surety                     
                                                            19             70,000                  08/20/03   08/27/03    St. Paul Surety                     
                                                            2             -17,987                  02/06/03   02/13/03    J.Hutchins Const.                   
                                                            2               3,057                  04/25/03   05/07/03    Collins-Hammond Elec.               
                                                            2              -9,200                  10/14/03   10/20/03    Four-C-Aire                         
                                                            2               2,904                  08/24/04   09/23/04    Norwood Plumbing                    
                                                            20             45,000                  08/20/03   08/27/03    St. Paul Surety                     
                                                            21             25,000                  08/20/03   08/27/03    St. Paul Surety                     
                                                            22             15,000                  08/20/03   08/27/03    St. Paul Surety                     
                                                            3             -12,900                  02/06/03   02/13/03    J.Hutchins Const.                   
                                                            4               6,720                  02/06/03   02/13/03    J.Hutchins Const.                   
                                                            5              13,831                  02/06/03   02/13/03    J.Hutchins Const.                   
                                                            6              -2,500                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            7              -5,624                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            8                -800                  05/06/03   05/08/03    J.Hutchins Const.                   
                                                            9                 230                  05/06/03   05/08/03    J.Hutchins Const.                   
 
14-0827   Reconstruction               5-019-002  01/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2093   Reconstruction               5-019-003  07/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FTR-1           3,900                  10/04/19   10/17/19    NORTHEAST PETROLEUM TECHNOLOGIES,INC
                                                            FTR-2           1,132                  01/17/20   02/10/20    NORTHEAST PETROLEUM TECHNOLOGIES    
 
19-1312   Reconstruction               5-019-004  04/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2           -5,490                  12/13/21   09/27/22    Perras Const Services Inc           
                                                            GC-2           -4,500                  12/13/21   09/27/22    Dow Elec Inc                        
                                                            SC-3          -22,467                  12/13/21   01/23/23    Perras Excavating Inc               
 
20-0300   Reconstruction               5-019-005  11/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FSC-1          -8,181                  04/01/21   05/12/21    ENVIROMENTAL & FUELING SYSTEMS, LLC 
                                                            fsc-2           5,093                  06/03/21   09/07/21    ENVIRONMENTAL FUELING               
 
20-1016   Reconstruction               5-019-006  03/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1954   Reconstruction               5-019-007  11/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
21-1110   Reconstruction               7-999-001  03/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE

MORRISTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-21-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
92-0231   Reconstruction               0-003-003  09/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1569   Reconstruction               0-003-005  06/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1408   Additions and Alterations    0-003-006  05/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0161   Reconstruction               0-003-007  08/25/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0497   Additions and Alterations    0-003-008  03/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,500                  07/31/01   01/08/02    THD Mechanicals                     
                                                            C-1             1,100                  01/09/02   05/28/02    Nextcom Communication Services      
                                                            E-1            13,326                  11/25/05   11/15/06    Collins-Hammond Electric            
                                                            E-2            18,615                  01/16/03   01/16/03    Collins Hammond Electric            
                                                            G-1            19,615                  11/25/05   11/21/06    J.E. Sheehan Contracting corp.      
                                                            G-10           53,620                  11/25/05   11/21/06    J.E. Sheehan Contracting Corp.      
                                                            G-2            19,057                  12/15/00   01/30/01    J.E. Sheehan Contracting Corp.      
                                                            G-3            14,106                  12/15/00   01/03/01    J.E. Sheehan Contracting Corp.      
                                                            G-4            12,990                  12/15/00   03/08/01    J.E. Sheehan Contracting Corp.      
                                                            G-5            40,282                  12/15/00   05/23/01    J.E. Sheehan Contracting Corp.      
                                                            G-6            30,845                  12/15/00   07/20/01    J.E. Sheehan Contracting Corp.      
                                                            G-7            29,522                  12/15/00   05/24/01    J.E. Sheehan Contracting Corp.      
                                                            G-8            14,866                  07/26/01   01/08/02    J.E. Sheehan Contracting, Corp.     
                                                            G-9            64,433                  11/25/05   11/21/06    J.E. Sheehan Contracting Corp.      
                                                            H-1             4,452                  07/08/01   07/20/01    Lawman Heating & Cooling            
                                                            H-2           -42,800                  11/25/05   01/31/06    Lawman Heating & Cooling, Inc.      
                                                            H-3             4,082                  07/31/01   01/08/02    Lawman Heating & Cooling            
                                                            H-4             2,119                  11/25/05   11/15/06    Lawman Heating & Cooling            
                                                            P-1             7,674                  11/25/05   11/15/06    Norwood Plumbing                    
                                                            P-2            -5,733                  11/25/05   01/31/06    Norwood Plumbing                    
 
08-1078   Reconstruction               0-003-009  06/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001         -14,140                  07/05/11   09/30/11    THIRTYFOUR AND CO INC               
                                                            G-001          20,406                  11/15/10   12/01/10    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            G-004          20,779                  04/28/11   05/24/11    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            G-005          16,983                  04/28/11   05/24/11    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            H-001         -13,375                  01/04/12   10/24/12    Empire Northeast, Inc.              
                                                            P-001          -1,137                  07/26/11   09/30/11    NORWOOD PLUMBING INC                
                                                            R-001         -25,916                  01/24/11   03/18/11    RSI ROOFING INC                     
                                                            R-002           1,836                  01/24/11   03/18/11    RSI ROOFING INC                     
 
12-1248   Reconstruction               0-003-010  07/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -5,000                  07/15/14   08/29/14    Northern Pier Contracting Inc.      
 
14-1172   Reconstruction               0-003-011  03/31/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0919   Reconstruction               0-003-012  01/20/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-001         22,667                  04/08/16   05/10/16    TEL, Inc.                           
                                                            EC-002         16,800                  06/08/16   06/30/16    TEL INC                             
 
16-0305   Reconstruction               0-003-013  05/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-GC002            0                  07/26/18   08/06/18    CONTINENTAL CONSTRUCTION LLC        
                                                            CO-MC002            0                  01/09/19   02/06/19    LAWMAN HEATING & COOLING, INC.      
                                                            CO-MC003            0                  01/09/19   02/06/19    LAWMAN HEATING & COOLING, INC.      
                                                            CO-MC004            0                  01/09/19   02/06/19    LAWMAN HEATING & COOLING, INC.      
                                                            CO-MC005      -26,879                  01/09/19   02/06/19    LAWMAN HEATING & COOLING, INC.      
                                                            EC-002         -8,064                  12/19/18   02/01/19    S&L ELECTRIC, INC.                  
                                                            GC-001              0                  07/20/18   08/06/18    CONTINENTAL CONSTRUCTION LLC        
                                                            GC-003              0                  08/29/18   11/29/18    MORRISTOWN CENTRAL SCHOOL DISTRICT  
                                                            GC-004              0                  10/30/18   01/16/19    CONTINENTAL CONSTRUCTION LLC        
                                                            GC-005            321                  10/30/18   01/24/19    CONTINENTAL CONSTRUCTION LLC        
                                                            GC-006         -3,307                  10/30/18   01/25/19    CONTINENTAL CONSTRUCTION LLC        
                                                            MC-001              0                  08/29/18   09/12/18    LAWMAN HEATING & COOLING INC        
                                                            PC-001           -363                  11/19/18   01/02/19    ENI MECHANICAL, INC.                
                                                            RC-001        -30,000                  10/30/18   01/24/19    PTI CONTRACTING CORP                
 
16-0792   Reconstruction               0-003-014  12/16/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0652   Reconstruction               0-003-015  02/02/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0328   Reconstruction               0-003-016  09/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          4,150                  01/02/19   03/12/19    NORTHERN TIER CONTRACTING INC       
 
18-0787   Reconstruction               0-003-017  01/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          5,849                  08/16/19   08/20/19    DOW ELECTRIC, INC.                  
                                                            EC-002         -4,291                  07/24/20   10/26/20    DOW ELECTRIC, INC.                  
                                                            EC-003          2,456                  07/24/20   10/26/20    DOW ELECTRIC, INC.                  
                                                            GC-001          8,000                  05/15/19   05/28/19    NORTHERN TIER CONTRACTING INC.      
                                                            GC-002          7,929                  08/16/19   08/19/19    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-003         20,508                  08/16/19   08/19/19    NORTHERN YIER CONTRACTING, INC.     
                                                            GC-004        -11,266                  08/16/19   08/19/19    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-005         20,540                  09/25/19   10/07/19    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-006         12,772                  09/25/19   10/07/19    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-007         -3,128                  09/25/19   10/07/19    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-008         11,505                  09/25/19   10/07/19    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-009         14,430                  10/25/22   10/25/22    NORTHERN TIER CONTRACTING           
                                                            GC-010         -4,428                  01/21/20   03/05/20    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-011         -7,608                  01/21/20   03/05/20    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-012        -19,500                  07/24/20   10/28/20    NORTHERN TIER CONTRACTING, INC.     
                                                            GC-013         -3,500                  07/24/20   10/28/20    NORTHERN TIER CONTRACTING, INC.     
                                                            MC-001          3,674                  04/25/19   04/26/19    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            MC-002         17,504                  04/25/19   04/26/19    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            MC-003          2,532                  06/28/19   07/05/19    HYDE-STONE MECHANICAL CONTRACTORS, I
                                                            MC-004          1,979                  08/16/19   08/20/19    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            MC-005         -1,050                  10/23/19   10/25/19    HYDE-STONE MECHANICAL CONTRACTORS,  
                                                            MC-006              0                  10/23/19   10/25/19    HYDE-STONE MECHANICAL CONTRACTORS,  
                                                            MC-007              0                  10/23/19   10/25/19    HYDE-STONE MECHANICAL CONTRACTORS,  
                                                            MC-008          1,764                  10/23/19   10/25/19    HYDE-STONE MECHANICAL CONTRACTORS   
 
19-0388   Reconstruction               0-003-018  12/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0559   Reconstruction               0-003-019  01/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          1,980                  11/19/21   12/01/22    Whitton Const                       
                                                            GC-002          4,941                  11/19/21   12/22/22    Whitton Const LLC                   
 
21-0001   Reconstruction               0-003-020  08/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0460   Reconstruction               0-003-021  10/24/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0640   Reconstruction               0-003-022  11/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1875FP Reconstruction               0-003-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage-Athl/Lawn Equip.:
99-0498   New Construction             2-005-001  03/20/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
94-0365   Reconstruction               5-001-001  11/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1079   Reconstruction               5-001-004  06/23/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-002          55,863                  11/15/10   12/01/10    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            G-003          27,080                  11/15/10   12/01/10    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            G-006           7,678                  07/26/11   09/21/11    HARVEY EXCAVATION & CONSTRUCTION CO 
 
16-0306   Reconstruction               5-001-005  05/09/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
23-0090   Reconstruction               7-999-001  12/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE

NORWOOD-NORFOLK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-22-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          K-12 Building(fmly HS):
93-1543   Additions and Alterations    0-001-006  08/23/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1956   Additions and Alterations    0-001-007  11/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,783                  08/29/02   09/05/02    Watson Elec.                        
                                                            1               1,512                  08/30/02   09/05/02    Harvey Excavation                   
                                                            1              22,500                  10/28/03   11/12/03    Four C Aire                         
                                                            10             -2,860                  01/14/03   01/23/03    Harvey Excavation                   
                                                            11               -715                  01/14/03   01/23/03    Harvey Excavation                   
                                                            12             -2,949                  01/14/03   01/23/03    Harvey Excavation                   
                                                            13             -1,317                  01/14/03   01/23/03    Harvey Excavation                   
                                                            14             10,277                  01/14/03   01/23/03    Harvey Excavation                   
                                                            15             11,600                  01/14/03   01/23/03    Harvey Excavation                   
                                                            15              8,100                  04/24/03   05/01/03    Harvey Excavation                   
                                                            16              3,155                  01/14/03   01/23/03    Harvey Excavation                   
                                                            17              3,500                  01/14/03   01/23/03    Harvey Excavation                   
                                                            2              12,250                  08/29/02   09/05/02    Watson Elec.                        
                                                            2               5,655                  08/30/02   09/05/02    Harvey Excavation                   
                                                            29             21,413                  10/28/03   11/12/03    Harvey Excavation                   
                                                            3               4,147                  08/29/02   09/05/02    Watson Elec.                        
                                                            3              81,290                  08/30/02   09/05/02    Harvey Excavation                   
                                                            3              11,408                  04/12/04   04/28/04    Norwood Plumbing                    
                                                            3              16,308                  07/12/05   07/21/05    four C Aire                         
                                                            30             15,941                  10/28/03     /  /      Harvey Excavation                   
                                                            31              2,284                  10/28/03   11/12/03    Harvey Excavation                   
                                                            32             27,158                  10/28/03   11/12/03    Harvey Excavation                   
                                                            33             17,174                  03/17/04   03/30/04    Harvey Excavation                   
                                                            34              8,177                  03/17/04   03/30/04    Harvey Excavation                   
                                                            4                 220                  08/29/02   09/05/02    Watson Elec.                        
                                                            4               2,454                  08/30/02   09/05/02    Harvey Excavation                   
                                                            4              11,760                  04/12/04   04/28/04    Norwood Plumbing                    
                                                            4               8,350                  07/12/05   07/21/05    Four C Aire Inc                     
                                                            5               1,586                  03/14/03   03/19/03    Watson Elec.                        
                                                            5               2,754                  04/12/04   04/28/04    Norwood Plumbing                    
                                                            5              -5,630                  07/12/05     /  /      four C Aire Inc                     
                                                            6               2,970                  01/14/03   01/23/03    Harvey Excavation                   
                                                            7               5,261                  01/14/03   02/06/03    Harvey Excavation                   
                                                            8               1,026                  01/14/03   02/06/03    Harvey Excavation                   
 
00-0524   Reconstruction               0-001-008  07/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1389   Reconstruction               0-001-009  05/11/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -10,765                  03/03/05   03/24/05    RSI roofing Inc                     
 
05-0030   Reconstruction               0-001-010  09/09/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -3,700                  05/30/06   08/08/06    Continental Construction            
                                                            1-02                0                  11/01/06   12/19/06    Continental construction            
                                                            2-01            2,364                  05/30/06   11/22/06    Northern mechanicals                
                                                            3-01            2,088                  06/22/06   11/30/06    Watson electric                     
 
06-1215   Reconstruction               0-001-012  03/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -2,500                  03/18/08   01/27/09    HYDE-STONE MECHANICAL CONTRACTORS   
 
07-1977   Reconstruction               0-001-013  05/02/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001             161                  02/13/09   04/07/09    CONTINENTAL CONSTRUCTION, LLC       
 
07-1981   Reconstruction               0-001-014  10/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001A              0                  02/22/11   03/18/11    BETTE & CRING LLC                   
                                                            1-001F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-002A              0                  02/22/11   03/18/11    BETTE & CRING LLC                   
                                                            1-002F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-003A              0                  02/22/11   03/18/11    BETTE & CRING LLC                   
                                                            1-003F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-004A              0                  02/23/11   03/18/11    BETTE & CRING LLC                   
                                                            1-004F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-005A              0                  02/23/11   03/18/11    BETTE & CRING LLC                   
                                                            1-006A              0                  02/23/11   03/18/11    BETTE & CRING LLC                   
                                                            1-006F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-007A              0                  02/23/11   03/18/11    BETTE & CRING LLC                   
                                                            1-007F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-008F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-009A              0                  02/23/11   03/18/11    BETTE & CRING LLC                   
                                                            1-009F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-01         -142,225                  05/21/09   07/10/09    BETTE & CRING LLC                   
                                                            1-010F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-011F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-012F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-014F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-015F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-016F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-017F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-018F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-019F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-02           10,205                  05/21/09   07/14/09    BETTE & CRING, LLC                  
                                                            1-020F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-03           28,184                  05/21/09   07/14/09    BETTE & CRING, LLC                  
                                                            1-04           13,976                  05/27/09   07/24/09    BETTE & CRING LLC                   
                                                            1-05           11,633                  10/13/09   11/04/09    BETTE & CRING LLC                   
                                                            1-06          -16,070                  10/13/09   11/03/09    BETTE & CRING LLC                   
                                                            1-07           15,768                  10/13/09   11/03/09    BETTE & CRING LLC                   
                                                            1-08           10,590                  08/21/09   09/11/09    BETTE & CRING LLC                   
                                                            1-10            5,830                  09/03/09   09/18/09    BETTE & CRING LLC                   
                                                            1-11           54,006                  09/22/09   10/26/09    BETTE & CRING LLC                   
                                                            1-12           18,893                  09/22/09   10/26/09    BETTE & CRING LLC                   
                                                            1-13           54,771                  11/17/09   12/17/09    BETTE & CRING LLC                   
                                                            1-14           10,759                  11/17/09   12/17/09    BETTE & CRING LLC                   
                                                            1-15           -4,500                  01/19/10   03/19/10    BETTE & CRING LLC                   
                                                            1-16            7,498                  01/22/10   02/23/10    BETTE & CRING LLC                   
                                                            1-17           -1,500                  08/10/10   09/24/10    BETTE & CRING LLC                   
                                                            1-18              816                  09/24/10   10/19/10    BETTE & CRING LLC                   
                                                            2-01           -7,890                  05/27/09   12/03/09    NORTHERN MECHANICALS INC            
                                                            2-01                0                  02/23/11   03/23/11    NORTHERN MECHANICALS INC            
                                                            2-02             -922                  01/27/11   02/24/11    NORTHERN MECHANICALS INC            
                                                            2-02                0                  02/23/11   03/23/11    NORTHERN MECHANICALS INC            
                                                            2-03                0                  02/23/11   03/23/11    NORTHERN MECHANICALS INC            
                                                            2-04                0                  02/23/11   03/23/11    NORTHERN MECHANICALS INC            
                                                            2-05                0                  02/23/11   03/23/11    NORTHERN MECHANICALS INC            
                                                            3-001               0                  02/23/11   03/23/11    NORWOOD PLUMBING INC                
                                                            3-002               0                  02/23/11   03/23/11    NORWOOD PLUMBING INC                
                                                            3-01           24,252                  05/19/10   07/21/10    NORWOOD PLUMBING INC                
                                                            3-02           14,200                  09/07/10   09/28/10    NORWOOD PLUMBING INC                
                                                            3-03                0                  02/23/11   03/23/11    NORWOOD PLUMBING INC                
                                                            4-001               0                  02/23/11   03/23/11    WATSON ELECTRIC                     
                                                            4-002               0                  02/23/11   03/23/11    WATSON ELECTRIC                     
                                                            4-003               0                  02/23/11   03/23/11    WATSON ELECTRIC                     
                                                            4-004               0                  02/23/11   03/23/11    WATSON ELECTRIC                     
                                                            4-005               0                  02/23/11   03/23/11    WATSON ELECTRIC                     
                                                            4-006               0                  02/23/11   03/23/11    WATSON ELECTRIC                     
                                                            4-01            6,237                  12/02/09     /  /      WATSON ELECTRIC                     
                                                            4-02           11,872                  03/22/10   05/14/10    WATSON ELECTRIC                     
                                                            4-03            7,188                  02/08/10   03/19/10    WATSON ELECTRIC                     
                                                            4-04            6,119                  06/25/10   08/25/10    WATSON ELECTRIC                     
                                                            5-01          -46,362                  02/08/10   03/19/10    rsi roofing inc                     
 
10-0214   Reconstruction               0-001-015  01/12/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           19,241                  08/31/11   09/23/11    HARVEY EXCAVATION AND CONSTRUCTION  
                                                            1-02           13,609                  10/17/11   12/29/11    HARVEY EXCAVATION & CONSTRUCTION    
                                                            1-03           12,246                  12/16/11   03/30/12    HARVEY EXCAVATION AND CONSTRUCTION  
                                                            1-04           -8,069                  02/21/12   09/28/12    HARVEY EXCAVATION AND CONSTRUCTION  
                                                            2-01           -5,000                  11/30/11   07/17/12    NORTHERN MECHANICALS INC            
                                                            3-01           -4,689                  01/06/12   04/24/12    S&L ELECTRIC                        
                                                            FO 1-01             0                  03/21/13   06/17/13    HARVEY EXCAVATION                   
                                                            FO 1-02             0                  03/21/13   06/17/13    HARVEY EXCAVATION                   
                                                            FO 1-03             0                  03/21/13   06/17/13    HARVEY EXCAVATION                   
                                                            FO 1-04             0                  03/21/13   06/17/13    HARVEY EXCAVATION                   
                                                            FO 1-05             0                  03/21/13   06/17/13    HARVEY EXCAVATION                   
                                                            FO 3-01             0                  03/21/13   06/28/13    S&L ELECTRIC                        
 
14-0578   Additions and Alterations    0-001-017  01/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  09/04/15   10/28/15    Contiental Construction LLC         
                                                            GC-02               0                  12/04/15   01/05/16    CONTINENTAL CONSTRUCTION,LLC        
                                                            GC-03               0                  12/04/15   01/05/16    CONTINENTAL CONSTRUCTION,LLC        
                                                            GC-04           2,554                  12/04/15   01/05/16    CONTINENTAL CONSTRUCTION,LLC        
                                                            MC-01               0                  09/04/15   10/28/15    Contiental Construction LLC         
                                                            MC-02          -2,679                  12/03/15   01/05/16    CONTINENTAL CONSTRUCTION,LLC        
                                                            SC-01          15,835                  11/09/15   11/30/15    Barrett Paving Materials            
                                                            SC-02          -2,816                  12/18/15   01/15/16    BARRETT PAVING MATERIALS            
 
14-1333   Additions and Alterations    0-001-018  04/01/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            32010010       25,180                  02/05/18   02/21/18    Ingalls Site Development            
                                                            EC-01         -81,765                  09/16/16   10/27/16    S&L Electric Inc.                   
                                                            EC-02               0                  10/07/16   10/17/16    S&L Electric, Inc.                  
                                                            EC-03           1,369                  10/17/16   10/21/16    S & L Electric, Inc.                
                                                            EC-04          -1,780                  10/27/16   11/17/16    S&L Electric, Inc.                  
                                                            EC-05          15,237                  10/27/16   11/17/16    S&L Electric, Inc.                  
                                                            EC-06               0                  10/27/16   11/17/16    S&L Electric, Inc.                  
                                                            EC-07           4,131                  03/31/17   06/05/17    S&L Electric, Inc.                  
                                                            EC-08           1,119                  04/10/17   05/17/19    S&L Electric, Inc.                  
                                                            EC-09          -4,800                  05/02/17   05/17/19    S&L Electric, Inc.                  
                                                            EC-10            -841                  05/18/17   06/02/17    S&L Electric, Inc.                  
                                                            EC-11           4,927                  06/01/17   06/02/17    S&L Electric, Inc.                  
                                                            EC-12           4,790                  08/16/17   10/04/17    S & L Electric Inc                  
                                                            EC-13           1,064                  08/16/17   10/04/17    S & L Electric Inc                  
                                                            EC-14               0                  09/11/17   10/12/17    S & L Electric Inc                  
                                                            EC-15          17,644                  09/11/17   06/18/19    S & L Electric Inc                  
                                                            EC-16               0                  11/13/17   06/05/18    S & L Electric Inc                  
                                                            EC-17          13,013                  11/15/17   06/05/18    S & L Electric Inc                  
                                                            EC-18               0                  12/22/17   01/23/18    S&L Electric Inc                    
                                                            EC-19          -1,290                  12/22/17   01/23/18    S&L Electric Inc                    
                                                            EC-20          -2,213                  12/22/17   05/13/19    S&L Electric Inc                    
                                                            GC-01           2,494                  10/05/16   09/20/19    Murnane Building Contractors, Inc.  
                                                            GC-02               0                  02/24/17   03/06/17    Murnane Building Contractors, Inc.  
                                                            GC-03         -11,400                  02/24/17   03/06/17    Murnane Building Contractors, Inc.  
                                                            GC-04          23,612                  02/24/17   03/06/17    Murnane Building Contractors, Inc.  
                                                            GC-05          -4,685                  02/24/17   03/06/17    Murnane Building Contractors, Inc.  
                                                            GC-06             826                  04/10/17   04/21/17    Murnane Building Contractors, Inc.  
                                                            GC-07           2,232                  05/04/17   05/10/17    Murnane Building Contractors, Inc.  
                                                            GC-08            -890                  05/18/17   06/01/17    Murnane Building Contractors, Inc.  
                                                            GC-09         -12,290                  06/01/17   06/23/17    Murnane Building Contractors, Inc.  
                                                            GC-10          -1,098                  06/01/17   06/23/17    Murnane Building Contractors, Inc.  
                                                            GC-11           6,073                  07/19/17   07/27/17    Murnane Building Contractors Inc    
                                                            GC-12               0                  09/07/17   09/14/17    Murnane Building Contractors Inc    
                                                            GC-13               0                  09/18/17   10/10/17    Murnane Building Contractors Inc    
                                                            GC-14             697                  09/18/17   10/10/17    Murnane Building Contractors Inc    
                                                            GC-15          11,025                  09/18/17   10/10/17    Murnane Building Contractors Inc    
                                                            GC-16            -744                  09/25/17   10/10/17    Murnane Building Contractors Inc    
                                                            GC-17               0                  11/15/17   12/04/17    Murnane Building Contractors        
                                                            GC-18         -11,540                  11/15/17   12/04/17    Murnane Building Contractors Inc    
                                                            GC-19           3,827                  11/24/17   02/13/18    Murnane Building Contractors Inc    
                                                            GC-20           1,996                  11/24/17   02/13/18    Murnane Building Contractors Inc    
                                                            GC-21          -3,500                  12/26/17   01/25/18    Murnane Building Contractors Inc.   
                                                            HVAC-01             0                  01/20/17   08/23/17    Burns Bros Contractors, Inc.        
                                                            HVAC-02         7,000                  04/14/17   06/06/17    Burns Bros Contractors, Inc.        
                                                            HVAC-03        11,040                  05/04/17   05/10/17    Burns Bros Contractors, Inc.        
                                                            HVAC-04        -5,940                  05/18/17   06/02/17    Burns Bros Contractors, Inc.        
                                                            HVAC-05         2,045                  05/18/17   06/07/17    Burns Bros Contractors Inc          
                                                            HVAC-06        14,932                  05/18/17   06/07/17    Burns Bros Contractors Inc          
                                                            HVAC-07             0                  09/25/17   10/12/17    Burns Bros Contractors Inc          
                                                            HVAC-08        13,232                  09/25/17   10/12/17    Burns Bros Contractors Inc          
                                                            HVAC-09        23,541                  11/15/17   06/05/18    Burns Bros Contractors Inc          
                                                            HVAC-10         3,807                  12/15/17   06/05/18    Burns Bros Contractors Inc/         
                                                            HVAC-11             0                  12/15/17   06/05/18    Burns Bros Contractors Inc.         
                                                            PC-01          16,039                  10/11/16   10/21/16    Burns Bros Contractors, Inc.        
                                                            PC-02          33,306                  02/21/17   06/03/19    Burns Bros Contractors, Inc.        
                                                            PC-03          34,895                  02/21/17   06/03/19    Burns Bros Contractors, Inc.        
                                                            PC-04          32,947                  02/21/17   06/03/19    Burns Bros Contractors, Inc.        
                                                            PC-05          11,446                  04/14/17   06/06/17    Burns Bros Contractors, Inc.        
                                                            PC-06           1,102                  08/16/17   10/04/17    Burns Bros Contractors Inc          
                                                            PC-07               0                  11/01/17   11/16/17    Burns Bros Contractors Inc          
                                                            PC-08               0                  11/27/17   06/01/18    Burns Bros Contractors Inc          
                                                            PC-09            -438                  12/13/17   06/05/18    Burns Bros Contractors Inc          
                                                            SC-01           1,712                  05/25/17   06/01/17    TJ Fiacco Construction LLC          
                                                            SC-02          10,180                  05/25/17   06/01/17    TJ Fiacco Construction LLC          
                                                            SC-03           5,656                  11/13/17   12/04/17    TJ Fiacco Construction LLC          
                                                            SC-04          12,000                  10/02/17   11/27/17    TJ Fiacco Construction LLC          
                                                            SC-05           3,719                  10/16/17   11/27/17    TJ Fiacco Construction LLC          
                                                            SC-06           3,414                  10/16/17   11/27/17    TJ Fiacco Construction LLC          
                                                            SC-07               0                  10/16/17   11/27/17    TJ Fiacco Construction LLC          
                                                            SC-08           2,270                  10/16/17   11/27/17    TJ Fiacco Construction LLC          
                                                            SC-09           1,995                  02/05/18   02/21/18    TJ Fiacco Construction LLC          
                                                            TC-01          -5,000                  12/15/17   06/05/18    Barber Marketing Inc.               
 
19-1332   Reconstruction               0-001-019  06/04/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01          11,670                  07/01/21   03/16/22    Trane                               
                                                            CC-03           8,556                  10/21/21   12/06/22    Trane                               
                                                            CC-04           4,386                  01/27/22   01/25/23    Trane                               
                                                            CC-2            1,971                  08/05/21   04/13/22    TRANE                               
                                                            EC-01R        -18,849                  07/25/22   05/09/23    Dow Elec                            
                                                            GC-01         -17,856                  04/08/21   05/17/21    BETTE & CRING, LLC                  
                                                            GC-02          -3,200                  07/01/21   04/04/22    Bette & Cring LLC                   
                                                            GC-03          10,153                  07/01/21   04/04/22    Belle & Cring LLC                   
                                                            GC-04           5,429                  07/20/21   12/30/21    Bette & Cring, LLC                  
                                                            GC-05          12,655                  08/26/21   05/06/22    BETTE & CRING, LLC                  
                                                            GC-06           8,387                  11/08/21   12/07/22    Bette&Cring, LLC                    
                                                            GC-07           2,910                  12/03/21   12/21/22    Bette&Cring LLC                     
                                                            MC-01           9,651                  07/20/21   12/14/21    Burns Bros Contractors              
                                                            MC-02          10,117                  08/18/21   04/19/22    BUMA BROS CONSTRUCTORS              
                                                            MC-03           5,239                  09/24/21   11/30/22    Burns Bros Contractors              
                                                            MC-04           2,936                  06/02/22   05/04/23    Burns Bros Contrs                   
                                                            PC-01           8,441                  07/20/21   12/14/21    Burns Bros Contractors              
                                                            PC-02          10,953                  09/24/21   11/30/22    Burns Bros Contractors              
                                                            SC-01          19,663                  09/24/21     /  /      TJ Fiacco                           
                                                            SC-02          19,579                  09/24/21   11/30/22    TJ Fiacco                           
                                                            SC-03          18,458                  09/24/21   11/30/22    TJ Fiacco                           
                                                            SC-04          19,883                  07/25/22   05/22/23    TJ Fiacco                           
                                                            SC-05           5,386                  09/15/22   10/03/23    TJ Fiacco                           
 
21-0672   Reconstruction               0-001-020  02/18/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01          -1,534                  10/12/22   05/18/23    Dow Elec                            
                                                            EC-02          -9,730                  06/14/23     /  /      DOW ELECTRIC                        
                                                            GC-01         -29,440                  09/15/22   10/03/23    Northern Tier Contracting           
                                                            GC-02           7,911                  12/16/22   12/06/23    Northern Tier Contrg                
                                                            GC-03          -9,825                  12/16/22   12/06/23    Northern Tier Contr                 
                                                            GC-04           3,334                  12/16/22   12/06/23    Northern Tier Contrg                
                                                            GC-05          15,929                  03/09/23   12/18/23    NORTHERN TIER CONTRACTING           
                                                            GC-06             972                  03/09/23     /  /      NORTHERN TIER CONTRACTING           
                                                            GC-06          12,747                  03/09/23   12/18/23    NORTHERN TIER CONTRACTING           
                                                            GC-07.1        16,763                  03/09/23     /  /      NORTHERN TIER CONTRACTING           
                                                            GC-07.2        16,763                  03/09/23   12/19/23    NORTHERN TIER CONTRACTING           
                                                            GC-07.3        16,763                  03/09/23   12/19/23    NORTHERN TIER CONTRACTING           
                                                            GC-07.4        16,763                  03/09/23   12/19/23    NORTHERN TIER CONTRACTING           
                                                            GC-07.5        19,115                  03/09/23   12/19/23    NORTHERN TIER CONTRACTING           
                                                            MC-01           9,294                  10/12/22   05/18/23    Hyde-Stone Mech                     
                                                            MC-02           5,400                  12/16/22   12/01/23    Hyde-Stone Mech                     
                                                            MC-03           2,380                  02/10/23   12/11/23    HYDE-STONE MECH                     
                                                            MC-04          12,800                  04/11/23   12/27/23    HYDE-STONE MECHANICAL               
                                                            PC-01          -8,632                  02/10/23   12/11/23    EMPIRE NORTHEAST MECH               
 

          XXBus Garage (2015-combined w 0-001):
93-1544   Additions and Alterations    5-004-002  08/23/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1957   Additions and Alterations    5-004-003  11/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 817                  03/19/03   03/28/03    Norwood Plumbing                    
                                                            18             15,495                  03/19/03   03/28/03    Harvey Excavation                   
                                                            19              6,674                  03/19/03     /  /      Harvey Excavation                   
                                                            2                -305                  06/25/03   07/01/03    Norwood Plumbing                    
                                                            2              11,354                  07/12/05   07/21/05    four c Aire inc                     
                                                            20              1,040                  03/19/03   03/28/03    Harvey Excavation                   
                                                            21              2,683                  03/19/03     /  /      Harvey Excavation                   
                                                            22              3,272                  03/19/03   03/28/03    Harvey Excavation                   
                                                            23             11,475                  03/19/03   03/28/03    Harvey Excavation                   
                                                            24                500                  03/19/03   03/28/03    Harvey Excavation                   
                                                            25             15,356                  03/19/03   03/28/03    Harvey Excavation                   
                                                            26             11,040                  03/19/03   03/28/03    Harvey Excavation                   
                                                            27              9,809                  05/27/03   06/10/03    Harvey Excavation                   
                                                            28             53,822                  09/08/03   09/16/03    Harvey Excavation                   
                                                            5               9,310                  01/16/03   02/06/03    Harvey Excavation                   
                                                            6              14,739                  03/19/03     /  /      Watson Elec.                        
                                                            7               2,145                  05/27/03   06/10/03    Watson Elec.                        
                                                            8               2,856                  07/24/03   08/04/03    Watson Elec.                        
                                                            9               3,467                  01/14/03   01/23/03    Harvey Excavation                   
                                                            9              16,262                  11/20/03     /  /      Watson Elec.                        
 
05-0031   Reconstruction               5-004-004  09/09/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1982   Reconstruction               5-004-005  10/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-005F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-008A              0                  02/23/11   03/18/11    BETTE & CRING LLC                   
                                                            1-01            1,987                  08/31/10   09/24/10    PERRAS EXCAVATING INC               
                                                            1-013F              0                  02/23/11   03/23/11    BETTE & CRING LLC                   
                                                            1-02           -1,235                  11/12/10   11/16/10    PERRAS EXCAVATING INC               
                                                            1-09            9,933                  09/03/09   09/18/09    BETTE & CRING LLC                   
 

OGDENSBURG CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-23-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXLincoln ES CLOSED SOLD 11/25/14:
91-1260   Reconstruction               0-001-005  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1571   Reconstruction               0-001-006  08/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1723   Reconstruction               0-001-008  08/20/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0393   Reconstruction               0-001-009  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4938/E-1          173                  04/08/03   04/21/03    S&L Electric                        
                                                            4938/E-2        1,013                  03/04/03   03/19/03    S&L Electric                        
                                                            4938/E-2        1,013                  03/04/03   03/19/03    S&L Electric                        
                                                            4938/E-3        2,269                  04/08/03   04/17/03    S&L Electric                        
                                                            4938/E-4          113                  04/08/03   04/21/03    S&L Electric                        
                                                            4938/H-3          376                  05/16/03   06/03/03    Northern Mech.                      
                                                            4938E-10        1,235                  04/08/03   04/21/03    S&L Electric                        
 
06-0877   Reconstruction               0-001-010  09/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-07                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            4-01                0                  06/10/10   08/04/10    S&L ELECTRIC                        
 
05-0333SC Visual Structural Inspection 0-001-SC1  11/08/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          X GoldenDomeSubmitIn 0-007:
98-1722   Reconstruction               0-002-005  08/20/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0394   Reconstruction               0-002-006  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            -8,144                  10/05/04   10/27/04    Concrete Restoration                
 
06-0878   Reconstruction               0-002-007  09/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001REV       26,455                  11/04/08   04/15/09    CON TECH BUILDING SYSTEMS, INC.     
                                                            1-01                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-02                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-04                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-06                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-10                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-14                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            2-01                0                  06/10/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            2-02                0                  06/10/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            3-03             -819                  09/30/09   11/16/09    NORWOOD PLUMBING INC                
                                                            4-002           1,040                  06/19/09   08/12/09    S&L ELECTRIC, INC.                  
                                                            4-04                0                  06/10/10   08/04/10    S&L ELECTRIC                        
                                                            4-07                0                  06/10/10   08/04/10    S&L ELECTRIC                        
                                                            4-08                0                  06/10/10   08/04/10    S&L ELECTRIC                        
 
10-0946   Reconstruction               0-002-008  06/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           14,757                  06/06/12   10/24/12    MERIDIAN CONSTRUCTION CORPORATION   
                                                            100-01              0                  08/28/13   09/19/13    Meridian Construction Corporation   
                                                            2                   0                  08/23/13   08/23/13    Davis Mechanical Services, Inc.     
                                                            200-01              0                  08/28/13   02/06/14    Davis Mechanical Services, Inc.     
                                                            200-02              0                  08/28/13   02/06/14    DAVIS MECHANICAL SERVICE, INC       
 
12-0386   Reconstruction               0-002-009  05/31/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1-01            7,175                  02/05/15   02/06/15    Cunningham Excavation               
                                                            1-02            1,344                  06/12/15   07/09/15    Cunningham Excavation               
                                                            1-03           11,670                  09/30/15   11/03/15    Cunningham Excavation               
                                                            1-04           10,972                  12/09/15   12/28/15    Cunningham Excavation               
                                                            101-01              0                  04/12/16   04/27/16    Cunningham Excavation               
                                                            101-010             0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-011             0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-02              0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-03              0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-04              0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-05              0                  04/12/16   05/04/16    Cunningham Excacation               
                                                            101-06              0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-07              0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-08              0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-09              0                  04/12/16   05/04/16    Cunningham Excavation               
                                                            101-12              0                  04/12/16     /  /      Cunnigham Excavation                
                                                            2-02           23,443                  12/17/15   01/15/16    MURNANE BUILDING CONTRACTORS        
                                                            2-03         -120,240                  12/24/15   01/25/16    MURNANE BUILDING CONTRACTORS        
                                                            201-03              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-05              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-14              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            203-04              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            5-02           -6,500                  12/09/12   01/27/14    Collins Hammond Electrical          
                                                            501-01              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-08              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-10              0                  03/11/16   03/17/16    Collins Hammond Electrical          
 
15-1965   Reconstruction               0-002-010  07/01/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-01            7,030                  02/03/17   09/14/17    Collins Hammond Electrical Contracto
 
17-1913   Reconstruction               0-002-011  07/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            2,238                  02/15/19   06/06/19    NORTHERN MECHANICAL,INC.            
 

          XXSherman Elementary Sch Sold 2014:
91-1261   Reconstruction               0-005-004  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1572   Reconstruction               0-005-005  08/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1727   Reconstruction               0-005-007  08/20/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0395   Reconstruction               0-005-008  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4938/G-8        2,248                  12/23/02   01/28/03    Harvey Excavation& Construction     
                                                            L-8             3,811           3,811  03/04/03   03/18/03    Harvey Excavation                   
 
06-0879   Reconstruction               0-005-009  09/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4-02                0                  06/10/10   08/04/10    S&L ELECTRIC                        
 
05-0335SC Visual Structural Inspection 0-005-SC1  11/08/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          John F. Kennedy Elem. School:
90-0843   Reconstruction               0-006-005  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1262   Reconstruction               0-006-006  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1573   Reconstruction               0-006-007  08/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1716   Reconstruction               0-006-008  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1724   Reconstruction               0-006-009  08/20/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0396   Reconstruction               0-006-010  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4938/G-6        6,997                  10/02/02   02/28/07    Harvey Excavation                   
                                                            4938/P-3          481                  12/23/02   01/08/03    Norwood Plumbing                    
                                                            4938E-5           932                  04/08/03   04/21/03    S&L Electric                        
                                                            H-1            -5,205                  10/02/02   11/01/02    Hyde-Stone Mech.                    
 
06-0880   Reconstruction               0-006-011  09/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-002          21,972                  06/03/09   08/31/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-004          16,768                  07/17/09   08/28/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-17                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            2-05                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            2-07                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            2-09                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            3-02           -4,235                  09/30/09   11/16/09    NORWOOD PLUMBING INC                
                                                            4-03                0                  06/10/10   08/05/10    S&L ELECTRIC                        
 
11-0197   Additions and Alterations    0-006-012  05/24/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1-01           18,665                  01/15/14   02/24/14    TJ Flacco Construction              
                                                            1-02           -3,775                  10/20/14   10/21/14    TJ Fiacco Construction              
                                                            1-03            1,700                  02/26/15   02/27/15    TJ Fiacco Construction              
                                                            101-01              0                  11/04/14   11/12/14    TJ Fiacco Construction, Co.         
                                                            101-02              0                  11/04/14   11/12/14    TJ Fiacco Construction, LLC         
                                                            101-03              0                  11/04/14   11/12/14    TJ Fiacco Construction, Co.         
                                                            101-04              0                  11/04/14   11/12/14    TJ Fiacco Construction, LLC         
                                                            101-05              0                  11/04/14   11/12/14    TJ Fiacco Construction, LLC         
                                                            101-06              0                  11/04/14   11/12/14    TJ Fiacco Construction, LLC         
                                                            2-01           23,470                  03/12/13   05/17/13    BETTE & CRING LLC                   
                                                            2-02            4,006                  06/26/13   08/09/13    Bette & Cring, LLC                  
                                                            2-03           20,761                  07/26/13   08/09/13    Bette & Cring, LLC                  
                                                            2-04            8,909                  10/28/13   11/15/13    Bette & Cring LLC                   
                                                            2-05           25,015                  01/30/14   03/05/14    BETTE & CRING LLC                   
                                                            2-06           24,608                  03/04/14   03/21/14    Bette & Cring, LLC                  
                                                            2-07           11,455                  03/04/14   03/21/14    Bette & Cring, LLC                  
                                                            2-08           23,930                  03/04/14   03/21/14    Bette & Cring LLC                   
                                                            2-09            8,797                  03/04/14   03/21/14    Bette & Cring, LLC                  
                                                            2-10          -10,901                  06/27/14   09/02/14    Bette & Cring LLC                   
                                                            2-11           21,800                  06/30/14   09/02/14    Bette & Cring LLC                   
                                                            2-12           20,700                  06/30/14   09/02/14    Bette & Cring LLC                   
                                                            2-13            5,236                  06/27/14   09/02/14    Bette & Cring LLC                   
                                                            2-14            4,435                  08/27/14   09/03/14    Bette & Cring LLC                   
                                                            2-15          -67,834                  09/18/14   09/23/14    Bette & Cring LLC                   
                                                            2-16            5,610                  10/31/14   11/12/14    Bette & Cring LLC                   
                                                            201-01              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-02              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-03              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-04              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-05              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-06              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-07              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-08              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-09              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-10              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-11              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-12              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-13              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-14              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-15              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            201-16              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            203-01              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            203-02              0                  12/03/14   12/09/14    Bette & Cring                       
                                                            203-03              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            203-04              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            203-05              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            205-01              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            206-01              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            206-02              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            206-03              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            206-04              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            206-05              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            206-06              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            206-07              0                  12/03/14   12/09/14    Bette & Cring LLC                   
                                                            3-01          -23,930                  04/02/14   05/08/14    Lawman Heating & Cooling            
                                                            3-02          -45,700                  09/10/14   09/12/14    Lawman Heating & Cooling            
                                                            301-01              0                  04/17/15   05/13/15    Lawman Heating & Cooling            
                                                            301-02              0                  04/17/15   05/13/15    Lawman Heating & Cooling            
                                                            301-03              0                  04/17/15   05/13/15    Lawman Heating & Cooling            
                                                            301-04              0                  04/17/15   05/13/15    Lawman Heating & Cooling            
                                                            301-05              0                  04/17/15   06/18/15    Lawman Heating & Cooling            
                                                            301-06              0                  04/17/15   06/18/15    Lawman Heating & Cooling            
                                                            301-07              0                  04/17/15   06/18/15    Lawman Heating & Cooling            
                                                            301-08              0                  04/17/15   06/18/15    Lawman Heating & Cooling            
                                                            301-09              0                  04/17/15   06/18/15    Lawman Heating & Cooling            
                                                            4-01          -14,323                  09/18/14   09/23/14    Norwood Plumbing                    
                                                            401-01              0                  04/17/15   04/28/15    Norwood Plumbing                    
                                                            401-02              0                  04/17/15   04/28/15    Norwood Plumbing                    
                                                            401-03              0                  04/17/15   04/28/15    Norwood Plumbing                    
                                                            401-04              0                  04/17/15   04/28/15    Norwood Plumbing                    
                                                            401-05              0                  04/17/15   04/28/15    Norwood Plumbing                    
                                                            401-06              0                  04/17/15   05/12/15    Norwood Plumbing                    
                                                            401-07              0                  04/17/15   05/12/15    Norwood Plumbing                    
                                                            5-01          -13,533                  09/15/14   09/18/14    Collins Hammond Electrical          
                                                            501-01              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-02              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-03              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-04              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-05              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-06              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-07              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-08              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-09              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-10              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-11              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-12              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            501-13              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            503-01              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            503-02              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            503-03              0                  12/03/14   12/09/14    Collins Hammond Electrical          
                                                            503-04              0                  12/03/14   12/09/14    Collins Hammond Electrical Contract 
                                                            6-01            7,997                  03/16/15   04/01/15    PTL Contracting Corp.               
 
22-0056FA Reconstruction               0-006-013  07/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02          -33,027                  06/21/23   12/22/23    BARRETT PAVING MATERIALS            
                                                            2-01           32,364                  05/10/23   12/22/23    CONTINENTAL CONSTRUCTION            
                                                            4-01                0                  06/20/23   12/27/23    DOW ELECTRIC                        
 
02-0540FP Reconstruction               0-006-FP1  11/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0332SC Visual Structural Inspection 0-006-SC1  11/08/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Free Academy:
90-0844   Reconstruction               0-007-006  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1263   Additions and Alterations    0-007-007  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1574   Reconstruction               0-007-008  08/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1717   Reconstruction               0-007-009  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1725   Reconstruction               0-007-010  08/20/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
00-0397   Reconstruction               0-007-011  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4938 G-9       29,762                  12/23/02   03/04/03    Harvey Excavation                   
                                                            4938-H5         6,759                  05/16/03   06/03/03    Northern Mechanicals                
                                                            4938/E-6       15,501                  03/04/03   03/19/03    S&L Electric                        
                                                            4938/G-4       17,192          13,362  10/02/02   04/04/07    Harvey Excavation                   
                                                            4938/G-5        7,193                  09/20/06   04/04/07    Harvey Excavation & Const.          
                                                            4938/H-2       22,739                  09/20/06   04/04/07    Northern Mechanical                 
                                                            4938/L-6        8,976                  10/02/02   04/04/07    Harvey Excavation                   
                                                            4938/L-7          403                  10/02/02     /  /      Harvey Excavation                   
                                                            4938/P-2        1,777                  12/23/02   01/08/03    Norwood Plumbing                    
                                                            4938E-6        15,501                  03/04/03   03/19/03    S&L Electric                        
                                                            4938G-10       24,383                  01/13/03   03/04/03    Harvey Excavation                   
                                                            4938G-11       14,756                  03/04/03   04/04/07    Harvey Excavation                   
                                                            E-1             6,664                  09/20/06   04/04/07    S & L Electric                      
                                                            G-2            10,789                  01/29/02   03/25/02    Harvey Excavation                   
                                                            G-3             9,365                  04/10/02   05/10/02    Harvey Excavation                   
                                                            P-1            16,142                  01/09/02   02/28/02    Norwood Plumbing                    
 
04-1329   Reconstruction               0-007-012  07/07/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0881   Reconstruction               0-007-013  09/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-003           3,888                  07/17/09   08/19/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-006         -31,460                  07/17/09   08/19/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-007          -7,280                  08/25/09   09/14/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-008          -1,588                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-03                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS           
                                                            1-05                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-08                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-09                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-11                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-12                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-13                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            2-001           5,834                  03/11/09   06/08/09    Skelly Contractors, Inc.            
                                                            2-002          31,088                  03/11/09   06/08/09    Skelly Contractors                  
                                                            2-003            -643                  10/26/09   11/20/09    SKELLY CONTRACTORS INC              
                                                            2-03                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            2-04                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            2-08                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            3-001          -1,376                  06/03/09   08/31/09    NORWOOD PLUMBING INC                
                                                            3-05           -2,094                  09/30/09   11/16/09    NORWOOD PLUMBING INC                
                                                            4-001           8,772                  06/19/09   08/12/09    S&L ELECTRIC, INC.                  
                                                            4-004          -4,326                  03/01/10   04/30/10    S&L ELECTRIC INC                    
                                                            4-05                0                  06/10/10   08/05/10    S&L ELECTRIC                        
                                                            4-06                0                  06/10/10   08/05/10    S&L ELECTRIC                        
                                                            5-001         -43,040                  06/03/09   08/31/09    RSI ROOFING INC                     
 
06-0869   Reconstruction               0-007-014  02/16/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0935   Reconstruction               0-007-015  05/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           10,815                  09/14/10   09/30/10    MURNANE BUILDING CONTRACTORS INC    
                                                            1-02          -18,536                  12/08/11   07/16/12    MURNANE BUILDING CONTRACTORS INC    
                                                            FO 1-01       -12,815                  04/12/12   08/14/12    MURNANE BUILDING CONTRACTORS INC    
                                                            FO 500-1       -3,300                  04/12/12   08/14/12    MURNANE BUILDING CONTRACTORS INC    
                                                            FO 500-2       -1,848                  04/12/12   08/14/12    MURNANE BUILDING CONTRACTORS INC    
 
12-0387   Reconstruction               0-007-016  05/31/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            2-01            9,586                  12/08/14   12/15/14    Murnane Building Contractors        
                                                            201-01              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-02              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-04              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-06              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-07              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-08              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-09              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-10              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-11              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-12              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            201-13              0                  04/14/16   05/09/16    Murnane Building Contractors        
                                                            202-01              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            202-02              0                  02/13/16   05/09/16    Murnane Building Contractors        
                                                            203-01              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            203-02              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            203-03              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            203-05              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            204-01              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            204-02              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            204-03              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            204-04              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            204-05              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            204-06              0                  04/13/16   05/09/16    Murnane Building Contractors        
                                                            3-01          -47,186                  07/02/15   08/04/15    Ductman Mechanical                  
                                                            301-01              0                  03/11/16   03/17/16    Ductman Mechanical                  
                                                            301-02              0                  03/11/16   03/17/16    Ductman Electrical                  
                                                            301-03              0                  03/11/16   03/17/16    Ductman Mechanical                  
                                                            301-04              0                  03/11/16   03/17/16    Ductman Mechanical                  
                                                            301-05              0                  03/11/16   03/17/16    Ductman Mechanical                  
                                                            4-01            9,189                  10/28/13   01/31/14    Norwood Plumbing                    
                                                            4-02           10,201                  10/23/14   10/24/14    Norwood Plumbing                    
                                                            4-03          -27,578                  02/26/15   03/18/15    Norwood Plumbing                    
                                                            401-01              0                  05/04/15   05/29/15    Norwood Plumbing, Inc.              
                                                            401-02              0                  05/04/15   05/29/15    Norwood Plumbing, Inc.              
                                                            5-03          -22,364                  10/22/15   01/25/16    Collins Hammond Electrical          
                                                            501-02              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-03              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-04              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-05              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-06              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-07              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-11              0                  03/11/16   03/17/16    Collins Hammond Electrical          
                                                            501-12              0                  03/11/16   03/17/16    Collins Hammond Electrical          
 
12-0965   Additions and Alterations    0-007-017  10/29/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6-01           14,096                  08/27/14   10/03/14    Bette & Cring Construction          
                                                            6-02           12,550                  10/23/14   10/24/14    Bette & Cring Construction          
                                                            6-03         -121,988                  11/28/14   02/06/15    Bette & Cring Construction          
                                                            6-04           13,025                  01/12/15   01/29/15    Bette & Cring Construction          
                                                            6-05          -44,296                  02/17/15   02/19/15    Bette & Cring Construction          
                                                            6-06           33,311                  05/19/15   06/10/15    Bette & Cring Construction          
                                                            6-07           81,235                  07/02/15   08/04/15    Bette & Cring Construction          
                                                            6-08           11,283                  06/18/15   10/29/15    Bette & Cring Construction          
                                                            6-09           16,845                  07/02/15   08/04/15    Bette & Cring Construction          
                                                            6-10           70,455                  07/02/15   08/04/15    Bette & Cring Construction          
                                                            6-11           57,370                  09/16/15   10/07/15    Bette & Cring Construction          
                                                            6-12           46,061                  09/16/15   10/07/15    Bette & Cring Construction          
                                                            6-13           16,664                  11/12/15   12/02/15    Bette & Cring Construction          
                                                            6-14          -11,178                  12/10/15   12/28/15    Bette & Cring Construction          
                                                            601-01         -9,106                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-02         -1,338                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-03         -9,474                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-04         -6,605                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-05        -10,045                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-06         -2,560                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-07         -4,693                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-08         -9,770                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-09         -3,359                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-10        -12,799                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-11        -10,884                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-13         -3,589                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-14           -590                  12/22/15   01/29/16    BETTE & CRING CONSTRUCTION          
                                                            601-15        -10,921                  12/22/15   01/29/16    Bette & Cring Construction          
                                                            602-01         -7,532                  12/22/15   01/22/16    BETTE & CRING CONSTRUCTION          
                                                            602-02           -602                  12/22/15   01/22/16    BETTE & CRING CONSTRUCTION          
                                                            603-01         -5,509                  12/22/15   01/21/16    BETTE & CRING CONSTRUCTION          
                                                            603-02        -21,207                  12/22/15   01/21/16    BETTE & CRING CONSTRUCTION          
                                                            603-03        -47,604                  12/22/15   01/21/16    BETTE & CRING CONSTRUCTION          
                                                            603-04        -15,946                  12/22/15   01/21/16    BETTE & CRING CONSTRUCTION          
                                                            604-01        -50,000                  12/22/15   01/21/16    BETTE & CRING CONSTRUCTION          
                                                            7-01           25,740                  05/22/14   06/27/14    ENI Mechanical                      
                                                            7-02           20,405                  08/27/14   10/03/14    ENI Mechanical                      
                                                            7-03          -35,702                  11/12/15   12/02/15    ENI Mechanical                      
                                                            701-01           -706                  12/22/15   01/21/16    ENI MECHANICAL                      
                                                            701-02         -1,959                  12/22/15   01/21/16    ENI MECHANICAL                      
                                                            701-03         -5,957                  12/22/15   01/21/16    ENI MECHANICAL                      
                                                            701-04         -6,304                  12/22/15   01/21/16    ENI MECHANICAL                      
                                                            8-01           11,017                  08/27/14   10/03/14    Burns Bros. Contracting             
                                                            8-02            2,373                  12/08/14   12/15/14    Burns Bros. Contracting             
                                                            8-03            1,570                  09/16/15   10/07/15    Burns Bros. Contracting             
                                                            801-01         -4,899                  12/22/15   01/21/16    BURNS BROS. CONTRACTING             
                                                            801-02         -1,704                  12/22/15   01/21/16    BURNS BROS. CONTRACTING             
                                                            801-03         -4,514                  12/22/15   01/21/16    BURNS BROS. CONTRACTING             
                                                            801-04         -5,355                  12/22/15   01/21/16    BURNS BROS. CONTRACTING             
                                                            801-05           -835                  12/22/15   01/21/16    BURNS BROS. CONTRACTING             
                                                            801-06         -2,689                  12/22/15   01/21/16    BURNS BROS. CONTRACTING             
                                                            9-01           82,620                  06/27/14   10/09/14    S&L Electric                        
                                                            9-02          -36,473                  08/27/14   10/03/14    S&L Electric                        
                                                            9-03           12,061                  01/05/15   02/05/15    S&L Electric                        
                                                            9-04           27,639                  11/12/15   12/02/15    S&L Electric                        
                                                            9-05          -48,424                  12/10/15   12/28/15    S&L Electric                        
                                                            901-01         -1,119                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-02         -3,238                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-03         -1,719                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-04         -2,453                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-05         -5,913                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-06         -5,393                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-07         -5,346                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-08         -4,365                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-09         -3,705                  12/22/15   01/21/16    S&L ELECTRIC                        
                                                            901-10         -3,320                  12/22/15   01/21/16    S&L ELECTRIC                        
 
11-0808   Reconstruction               0-007-018  05/01/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1101-01             0                  05/27/14   06/27/14    Murnane Building Contractors        
 
13-0087   Reconstruction               0-007-019  01/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            10-01          42,149                  10/05/15   11/03/15    Murnane Building Contractors        
                                                            10-02          55,187                  11/12/15   12/02/15    Murnane Building Contactors         
                                                            10-03         108,480                  05/23/16   06/07/16    MURNANE BUILDING                    
                                                            11-01          80,478                  07/02/15   08/04/15    Northern Mechanicals Inc.           
                                                            11-02          31,045                  09/23/15   11/25/15    Northern Mechanicals, Inc.          
                                                            11-03         -47,331                  05/23/16   06/07/16    NORTHERN MECHANICALS                
                                                            12-01         -11,220                  02/11/16   03/07/16    Hyde Stone Mechancial Contractors   
                                                            1201-01             0                  03/09/16   03/24/16    Hyde Stone Mechanical Contractors   
                                                            1201-02             0                  03/09/16   03/22/16    Hyde Stone Mechanical Contractors   
                                                            1201-03             0                  03/09/16   03/22/16    Hyde Stone Mechanical Contractors   
                                                            13-01          26,211                  12/09/15   12/28/15    Collins Hammond Electrical          
                                                            13-02         -10,387                  05/23/16   06/07/16    COLLINS HAMMOND ELECTRICAL          
                                                            14-01          -3,889                  01/08/16   01/22/16    BARRETT PAVING MATERIALS            
 
15-1793   Reconstruction               0-007-020  07/12/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           19,485                  08/09/17   06/21/19    Burns Bros. Contractors             
                                                            1-02           -5,022                  06/05/18   07/03/18    BURNS BROS CONTRACTORS              
                                                            2-02           -6,147                  07/03/18   07/26/18    COLLINS HAMMOND ELECTRICAL CONTRACTO
 
16-1989   Reconstruction               0-007-021  09/22/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -7,400                  01/03/18   01/31/18    Burns Bros. Contractors             
                                                            1-02           -5,000                  06/22/18   07/24/18    BURNS BROS CONTRACTORS              
 
19-0132   Reconstruction               0-007-022  08/19/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1862   Reconstruction               0-007-023  07/24/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -3,173                  03/02/21   04/19/21    BURNS BROS. CONTRACTORS, LLC        
                                                            101-01              0                  03/03/21   04/20/21    BURNS BROS. CONTRACTING             
 
21-0106   Reconstruction               0-007-024  08/28/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -5,000                  01/10/23   11/16/23    ENI MECH INC                        
 
22-1970   Reconstruction               0-007-025  06/05/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           61,750                  08/28/23   12/18/23    D.C. BUILDING SYSTEMS               
                                                            1-02           61,250                  08/28/23   12/18/23    D.C. BUILDING SYSTEMS               
                                                            1-03           87,020                  08/28/23   12/18/23    D.C BUIDLING SYSTEMS                
 
02-0541FP Reconstruction               0-007-FP1  11/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0022SC Visual Structural Inspection 0-007-SC1  07/09/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0331SC Visual Structural Inspection 0-007-SC2  11/08/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Madill Elementary School:
91-1264   Reconstruction               0-014-004  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1575   Reconstruction               0-014-005  08/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1726   Reconstruction               0-014-007  08/20/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0398   Additions and Alterations    0-014-008  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4938 H-4       -2,000                  05/16/03   06/03/03    Northern Mechanical                 
                                                            4938/E-7          258                  03/04/03   03/19/03    S&L Electric                        
                                                            4938/E-8        8,349                  04/08/03   04/21/03    S&L Electric                        
                                                            4938/G-7        7,384                  10/02/02   02/28/07    Harvey Excavation                   
                                                            4938/P-4          105                  12/23/02   01/08/03    Norwood Plumbing                    
                                                            4938E-12          163                  04/08/03   04/21/03    S&L Electric                        
                                                            4938E-7           258                  03/04/03   04/21/03    S&L Electric                        
 
04-1330   Reconstruction               0-014-009  07/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,978                  06/15/06   08/11/06    PYL Contracting Corp                
 
06-0882   Reconstruction               0-014-010  09/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-005          -7,108                  07/17/09   08/19/09    CON TECH BUILDING SYSTEMS INC       
                                                            1-15                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS           
                                                            1-16                0                  09/17/09   09/25/09    CON TECH BUILDING SYSTEMS INC       
                                                            2-06                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            2-10                0                  06/10/10   08/05/10    SKELLY CONTRACTORS INC              
                                                            3-01           -1,321                  09/30/09   11/16/09    NORWOOD PLUMBING INC                
                                                            3-04             -155                  09/30/09   11/16/09    NORWOOD PLUMBING INC                
                                                            4-003           3,640                  06/19/09   08/12/09    S&L ELECTRIC, INC.                  
                                                            4-09                0                  06/10/10   08/05/10    S&L ELECTRIC                        
 
11-0198   Additions and Alterations    0-014-011  03/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            10-01          20,426                  07/19/12   10/18/13    NEW CENTURY ELECTRIC                
                                                            10-02           7,835                  01/08/13   02/14/14    NEW CENTURY ELECTRIC                
                                                            10-03          10,192                  01/08/13   02/14/14    NEW CENTURY ELECTRIC                
                                                            10-04          -9,586                  02/05/13   02/14/14    NEW CENTURY ELECTRIC                
                                                            10-05         -18,554                  03/07/13   06/13/14    NEW CENTURY ELECTRIC                
                                                            1001-01             0                  10/28/13   06/13/14    New Century Electric                
                                                            1001-02             0                  10/28/13   06/13/14    New Century Electric                
                                                            1001-03             0                  10/28/13   06/13/14    New Century Electric                
                                                            1001-04             0                  10/28/13   06/13/14    New Century Electric                
                                                            1001-05             0                  10/28/13   06/13/14    New Century Electric                
                                                            1001-06             0                  10/28/13   06/13/14    New Century Electric                
                                                            1001-07             0                  10/28/13   06/13/14    New Century Electric                
                                                            1003-001            0                  10/28/13     /  /      New Centry Electric                 
                                                            1003-02             0                  10/28/13   06/13/14    New Century Electric                
                                                            7-01           28,976                  08/23/12   12/07/12    LORAN CONSTRUCTION                  
                                                            7-02           21,480                  09/14/12   01/24/13    LORAN CONSTRUCTION                  
                                                            7-03           30,689                  09/14/12   01/24/13    LORAN CONSTRUCTION                  
                                                            7-04           12,816                  09/14/12   01/24/13    LORAN CONSTRUCTION                  
                                                            7-05           15,603                  09/14/12   01/24/13    LORAN CONSTRUCTION                  
                                                            7-06           24,192                  02/19/13   05/14/13    LORAN CONSTRUCTION                  
                                                            7-07           30,240                  02/19/13   05/14/13    LORAN CONSTRUCTION                  
                                                            7-08           20,747                  03/29/13   06/28/13    LORAN CONSTRUCTION                  
                                                            7-09           -8,347                  06/11/13   07/26/13    Loran Construction                  
                                                            701-01              0                  09/26/13   10/24/13    Loran Construction                  
                                                            701-02              0                  09/26/13   10/24/13    Loran Construction                  
                                                            701-03              0                  09/26/13   10/24/13    Loran Construction                  
                                                            701-04              0                  09/26/13     /  /      Loran Construction                  
                                                            701-05              0                  09/26/13   10/24/13    Loran Constrction                   
                                                            701-06              0                  09/26/13   10/24/13    Loran Construction                  
                                                            701-07              0                  09/26/13   10/24/13    Loran Construction                  
                                                            701-08              0                  09/26/13   10/24/13    Loran Construction                  
                                                            701-09              0                  09/26/13   10/24/13    Loran Construction                  
                                                            702-01              0                  09/26/13   10/24/13    Loran Construction                  
                                                            702-02              0                  09/26/13   10/24/13    Loran Construction                  
                                                            8-01           -2,926                  04/12/13   06/13/14    NORTHERN MECHANICALS INC            
                                                            8-02          -28,622                  04/12/13   06/13/14    NORTHERN MECHANICALS INC            
                                                            801-01              0                  10/28/13   06/13/14    Northern Mechanicals                
                                                            801-02              0                  10/28/13   06/13/14    Northern Mechanicals                
                                                            9-01           -2,553                  05/16/13   06/13/14    Burns Bros. Contracting             
                                                            901-01              0                  10/28/13   06/13/14    Burns Bros. Construction            
                                                            901-02              0                  10/28/13   06/13/14    Burns Bros. Construction            
                                                            901-03              0                  10/28/13   06/13/14    Burns Bros. Construction            
                                                            901-04              0                  10/28/13   06/13/14    Burns Bros. Construction            
 
09-0936   Reconstruction               0-014-012  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0542FP Reconstruction               0-014-FP1  11/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0334SC Visual Structural Inspection 0-014-SC1  11/08/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Garage #1:
13-0088   Reconstruction               2-008-002  01/24/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          eetal Storage Bldg.:
11-0199   Reconstruction               2-013-002  05/24/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXATHLETIC STORAGE BLDGDemo'dAug2013:
00-0399   New Construction             2-018-001  04/17/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          MAINTENANCE STORAGE BLDG:
00-0400   New Construction             2-019-001  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-9               177                  04/17/03   05/01/03    S&L Electric                        
 

          Concession Building:
12-0388   New Construction             7-020-001  05/31/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
12-0389   New Construction             7-021-001  05/31/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5-01           21,667                  12/09/13   02/06/14    Collins Hammond Electrical          
                                                            501-09              0                  03/11/16   03/17/16    Collins Hammond Electrical          
 

          District-Wide:
95-1576   Reconstruction               7-999-001  06/21/96  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1503   Reconstruction               7-999-002  07/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE

HEUVELTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-24-04-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
90-0510   Reconstruction               0-001-001  01/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0909   Reconstruction               0-001-002  03/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0253   Reconstruction               0-001-004  02/19/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-1           -12,816                  04/05/01   01/14/02    Bruska Electric                     
                                                            E-5             9,786                  04/05/01   01/14/02    Watson Elec.                        
                                                            E-6             1,991                  06/21/01   02/08/02    Watson Elec.                        
                                                            G-18rev         2,764                  06/25/03   06/25/03    Murnane Bldg.                       
                                                            G-31           -2,660                  04/05/01   01/14/02    Murnane Bldg.                       
                                                            G-32            4,894                  06/14/01   01/10/02    Murnane Bldg.                       
                                                            H-1             7,465                  04/05/01   01/14/02    Northern Mech.                      
                                                            L-3            12,248                  06/23/03   06/24/03    Harvey Excavation                   
                                                            L-6             1,701                  06/12/03   06/12/03    Harvey Excavation                   
                                                            P-2            23,593                  06/12/03   06/12/03    St. Lawrence Mech.                  
 
08-1026   Additions and Alterations    0-001-006  06/17/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          26,386                  04/14/11   05/10/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            E-002          -7,365                  04/13/12   09/12/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            E001           -6,150                  05/17/10   08/04/10    WATSON ELECTRIC INC                 
                                                            G001           31,624                  11/15/10   11/22/10    BETTE & CRING LLC                   
                                                            G002           13,629                  11/15/10   11/22/10    BETTE & CRING LLC                   
                                                            G0021          22,326                  04/13/12   08/23/12    BETTE AND CRING LLC                 
                                                            G004           23,292                  01/11/11   02/11/11    BETTE & CRING LLC                   
                                                            G005           27,471                  02/07/11   03/03/11    BETTE & CRING LLC                   
                                                            G006           29,604                  02/07/11   03/03/11    BETTE & CRING LLC                   
                                                            G007           26,041                  04/05/11   05/13/11    BETTE AND CRING LLC                 
                                                            G008           24,400                  10/07/11   02/28/12    BETTE AND CRING LLC                 
                                                            G009           15,725                  01/09/12   05/17/12    BETTE AND CRING LLC                 
                                                            G010           10,351                  01/09/12   05/07/12    BETTE AND CRING LLC                 
                                                            G011           18,641                  01/09/12   05/07/12    BETTE AND CRING LLC                 
                                                            G012            6,868                  01/09/12   05/07/12    BETTE AND CRING LLC                 
                                                            G013           13,445                  01/09/12   05/07/12    BETTE AND CRING LLC                 
                                                            G014           12,824                  01/09/12   05/07/12    BETTE AND CRING LLC                 
                                                            G015           10,201                  01/09/12   05/07/12    BETTE AND CRING LLC                 
                                                            G016           10,130                  01/09/12   05/07/12    BETTE AND CRING LLC                 
                                                            G017           11,785                  03/12/12   08/07/12    BETTE AND CRING LLC                 
                                                            G018           10,036                  04/13/12   08/23/12    BETTE AND CRING LLC                 
                                                            G019           21,063                  04/13/12   08/23/12    BETTE AND CRING LLC                 
                                                            G020           16,452                  04/13/12   08/23/12    BETTE AND CRING LLC                 
                                                            H-001          15,847                  10/28/11   02/23/12    EMPIRE NORTHEAST INC                
                                                            H-002          20,921                  10/28/11   02/23/12    EMPIRE NORTHEAST INC                
                                                            P-003           2,984                  12/19/11   01/24/13    SKELLY CONTRACTORS INC              
                                                            P001            3,929                  12/09/10   01/20/11    SKELLY CONTRACTORS INC              
                                                            P002           15,828                  10/07/11   04/16/12    SKELLY CONTRACTORS INC              
                                                            R001          -14,947                  12/09/10   02/28/11    RSI ROOFING INC                     
                                                            S-003           6,674                  08/23/11   09/07/11    T.J. FIACCO CONSTRUCTION LLC        
                                                            S-004           8,755                  08/23/11   09/07/11    T.J. FIACCO CONSTRUCTION LLC        
                                                            S001            9,389                  11/15/10   11/22/10    T.J. FIACCO CONSTRUCTION LLC        
 
11-0599   Reconstruction               0-001-007  04/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E001            4,241                  08/30/12   08/07/13    WATSON ELECTRIC                     
                                                            E002            6,774                  10/11/12   08/12/13    WATSON ELECTRIC INC                 
                                                            E003            1,109                  02/13/13   07/26/13    WATSON ELECTRIC INC                 
                                                            G001           27,500                  08/30/12   12/20/12    BETTE AND CRING LLC                 
                                                            G002           19,492                  10/11/12   08/09/13    BETTE AND CRING LLC                 
                                                            G004            4,901                  12/06/12   11/22/13    BETTE AND CRING LLC                 
                                                            G005              842                  02/13/13   05/31/13    BETTE AND CRING LLC                 
                                                            H-001          -7,746                  03/12/13   07/26/13    EMPIRE NORTHEAST INC                
                                                            P001          -21,144                  02/13/13   07/26/13    NORWOOD PLUMBING INC                
 
12-0539   Reconstruction               0-001-008  07/19/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01          11,895                  05/09/14   06/30/14    Norsworthy Electric, LLC            
                                                            EC-02          -2,000                  03/16/15   04/01/15    Norsworthy Electric                 
                                                            GC-01          22,876                  02/25/14   03/21/14    Continental Construction, LLC       
                                                            GC-02           5,426                  04/08/14   04/18/14    Continental Construction, LLC       
                                                            GC-03          29,028                  03/16/15   04/01/15    Continental Construction LLC        
                                                            GC-04           4,809                  03/16/15   04/01/15    Continental Construction LLC        
                                                            HC-01          12,252                  03/16/15   04/01/15    Skelly Contractors, Inc.            
                                                            PC-01           6,165                  03/16/15   04/01/15    ENI Mechanical Inc.                 
 
14-0697   Reconstruction               0-001-009  02/04/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           3,100                  01/11/16   01/21/16    COLLINS-HAMMOND ELECTRICAL          
                                                            GC-01          13,343                  01/11/16   01/21/16    CONTINENTIAL CONSTRUCTION           
 
15-0583   Reconstruction               0-001-010  07/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           4,802                  05/08/18   05/15/18    Watson Electric                     
                                                            EC-02            -553                  05/08/18   05/15/18    Watson Electric                     
                                                            EC-03           2,625                  05/08/18   05/15/18    Watson Electric, Inc.               
                                                            GC-01          26,089                  04/28/17   05/12/17    Black Horse Group LLC.              
                                                            GC-02          20,151                  08/25/17   10/10/17    Black Horse Group LLC.              
                                                            GC-03          12,442                  08/25/17   10/10/17    Black Horse Group LLC.              
                                                            GC-04          18,056                  08/25/17   10/10/17    Black Horse Group LLC.              
                                                            GC-05           6,706                  08/25/17   10/10/17    Black Horse Group LLC.              
                                                            GC-06          26,886                  08/25/17   10/10/17    Black Horse Group LLC               
                                                            GC-07           9,863                  08/25/17   10/10/17    Black Horse Group LLC               
                                                            GC-08           5,025                  05/08/18   06/01/18    Black Horse Group LLC               
                                                            GC-11          29,854                  05/08/18   06/01/18    Black Horse Group LLC               
                                                            GC-12           7,870                  02/21/18   02/28/18    Black Horse Group LLC               
                                                            GC-14           4,933                  02/21/18   02/28/18    Black Horse Group LLC               
                                                            GC-15           6,493                  02/21/18   02/28/18    Black Horse Group LLC               
                                                            GC-16          46,439                  02/21/18   02/28/18    Black Horse Group LLC               
                                                            GC-17          12,550                  02/21/18   02/28/18    Black Horse Group LLC               
                                                            GC-18           1,856                  03/26/18   03/29/18    Black Horse Group LLC               
                                                            GC-19           2,226                  03/26/18   03/29/18    Black Horse Group                   
                                                            GC-19           2,226                  05/08/18   06/01/18    Black Horse Group                   
                                                            MC-01             678                  05/08/18   05/15/18    Hyde-Stone Mechanical               
                                                            PC-02           5,590                  02/21/18   03/07/18    Burns Brothers Inc.                 
                                                            PC-03          -1,073                  05/21/18   05/31/18    Burns Brothers Inc.                 
 
17-1668   Reconstruction               0-001-011  03/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          29,629                  11/21/19   11/27/19    TEL INC.                            
                                                            GC-01          36,399                  11/21/19   12/10/19    WHITTON CONSTRUCTION LLC            
                                                            GC-02          16,408                  11/21/19   12/10/19    WHITTON CONSTRUCTION LLC            
                                                            GC-03          41,111                  11/21/19   12/10/19    WHITTON CONSTRUCTION LLC            
                                                            GC-04          66,550                  11/21/19   12/10/19    WHITTON CONSTRUCTION LLC            
                                                            GC-05           6,525                  11/21/19   12/10/19    WHITTON CONSTRUCTION LLC            
                                                            GC-06          16,939                  11/21/19   12/11/19    WHITTON CONSTRUCTION, LLC           
                                                            GC-07           1,914                  03/03/20   07/06/20    WHITTON CONSTRUCTION, LLC           
                                                            MC-01          18,349           1,171  11/21/19   11/27/19    EMPIRE MORTHEAST MECHANICAL, INC.   
                                                            MC-02           1,709                  11/21/19   11/27/19    EMPIRE NORTHEAST MECHANICAL, INC.   
                                                            PC-02           2,116                  01/07/20   01/28/20    SKELLY CONTRACTORS, INC.            
 
19-1825   Reconstruction               0-001-012  08/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0046   Reconstruction               0-001-013  10/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           1,736                  09/12/23   12/22/23    CONTINENTAL CONST LLC               
 
22-2332   Reconstruction               0-001-014  07/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1165FP Reconstruction               0-001-FP1  02/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building - East:
11-0600   New Construction             2-006-001  04/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building - West:
11-0601   New Construction             2-007-001  04/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
90-0511   Reconstruction               5-002-002  01/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0254   Reconstruction               5-002-003  02/19/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0137   Reconstruction               5-002-004  08/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1027   Reconstruction               5-002-005  06/17/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G003           10,589                  01/11/11   02/11/11    BETTE & CRING LLC                   
                                                            P-004           2,739                  12/19/11   01/24/13    SKELLY CONTRACTORS INC              
                                                            S-002           5,301                  11/15/10   11/22/10    T.J. FIACCO CONSTRUCTION LLC        
 
11-0602   Reconstruction               5-002-006  04/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E004           31,928                  02/13/13   09/19/13    WATSON ELECTRIC INC                 
                                                            G003           10,857                  12/06/12   11/22/13    BETTE AND CRING LLC                 
 
15-0584   Reconstruction               5-002-007  07/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-09          27,030                  05/08/18   06/01/18    Black Horse Group LLC               
                                                            GC-10          20,175                  05/08/18   06/01/18    Black Horse Group LLC               
                                                            GC-13           9,502                  02/21/18   02/28/18    Black Horse Group LLC               
                                                            RC-01           3,725                  02/21/18   02/28/18    EW Davis Inc.                       
                                                            RC-02           5,060                  02/21/18   02/28/18    EW Davis Inc.                       
 
17-1669   Reconstruction               5-002-008  03/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01           1,938                  11/21/19   11/27/19    SKELLY CONTRACTORS, INC.            
 

PARISHVILLE-HOPKINTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-25-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
90-0710   Reconstruction               0-003-006  02/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0741   Reconstruction               0-003-007  06/22/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0948   Reconstruction               0-003-008  06/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1567   Reconstruction               0-003-009  06/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0783   Reconstruction               0-003-010  03/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0525   Reconstruction               0-003-011  12/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1838   Reconstruction               0-003-012  11/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1001   Additions and Alterations    0-003-014  09/23/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           5,192                  12/17/03   10/04/05    Ridley Elec.                        
                                                            E-002          33,276                  05/12/04   05/14/04    Ridley Elec.                        
                                                            E-003          18,037                  07/21/04   07/27/04    Ridley Elec.                        
                                                            E-004           3,752                  11/18/04   12/06/04    Ridley Elec.                        
                                                            E-005           3,563                  01/26/05   03/18/05    Ridley electric Company             
                                                            E-006          11,362                  06/09/05   07/20/05    Ridley Electric Co                  
                                                            G-001           6,567                  09/16/03   10/06/03    Murnane Building                    
                                                            G-002           4,608                  12/23/03   03/15/04    Murnane Building                    
                                                            G-003           1,031                  03/17/04   04/07/04    Murnane Building                    
                                                            G-004          79,263                  06/14/04   06/22/04    Murnane Building                    
                                                            G-005           9,552                  09/27/04   12/24/04    Murnane Building                    
                                                            G-006          11,084                  05/11/05   07/14/05    Murnane Buildign Contractors        
                                                            G-007           4,910                  07/22/05   08/02/05    Murnane Building Contractors        
                                                            G-008            -419                  12/12/05   06/26/06    Murnane Heating Constractors        
                                                            H-001           4,371                  03/09/04   04/26/04    Northern Mech.                      
                                                            H-002           9,270                  07/21/04   07/27/04    Northern Mech.                      
                                                            H-003          14,849                  10/26/04   12/23/04    Northern Mech.                      
                                                            H-004          -1,381                  01/10/05   03/18/05    Northern Mechanicals Inc            
                                                            P-001           5,170                  11/28/03   01/08/04    Norwood Plumbing                    
                                                            P-002             812                  05/07/04   05/14/04    Norwood Plumbing                    
                                                            P-003          13,829                  09/20/04   12/07/04    Norwood Plumbing                    
 
07-1194   Reconstruction               0-003-015  08/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01                0                  10/26/09   11/20/09    SKELLY CONTRACTORS INC              
                                                            E-02              459                  12/11/09   02/04/10    SKELLY CONTRACTORS INC              
                                                            E-03            1,079                  12/11/09   02/04/10    SKELLY CONTRACTORS INC              
                                                            E-04            1,897                  12/11/09   02/04/10    SKELLY CONTRACTORS INC              
                                                            H-01            4,476                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            H-02            6,762                  10/12/10   10/29/10    SKELLY CONTRACTORS INC              
                                                            H-03           -3,762                  10/28/10   11/03/10    SKELLY CONTRACTORS INC              
                                                            P-01            3,336                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-02              460                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-03              938                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-04              458                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-05              369                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-06              510                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-08            1,094                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-09              462                  05/07/10   08/04/10    SKELLY CONTRACTORS INC              
                                                            P-10              384                  10/12/10   10/29/10    SKELLY CONTRACTORS INC              
                                                            R-01           14,856                  10/26/09   11/30/09    RSI ROOFING INC                     
                                                            R-02           15,724                  10/26/09   11/30/09    RSI ROOFING INC                     
                                                            R-03              985                  02/18/10   03/30/10    RSI ROOFING INC                     
                                                            R-04            2,813                  02/18/10   03/30/10    RSI ROOFING INC                     
                                                            R-05              791                  12/11/09   02/04/10    RSI ROOFING INC                     
                                                            R-06             -170                  02/08/10   03/25/10    RSI ROOFING INC                     
                                                            R-07            5,761                  05/07/10   08/04/10    RSI ROOFING INC                     
 
12-0396   Reconstruction               0-003-016  08/20/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01                0                  10/06/14   10/08/14    Watson Electric                     
                                                            E-02                0                  10/06/14   10/08/14    Watson Electric                     
                                                            E-03                0                  10/06/14   10/08/14    Watson Electric                     
                                                            E-04                0                  10/06/14   10/08/14    Watson Electric                     
                                                            E-05            4,441                  10/06/14   10/08/14    Watson Electric                     
                                                            E-06           11,756                  12/24/14   01/13/15    Watson Electric                     
                                                            E-07             -271                  04/03/15   04/21/15    Watson Electric                     
 
14-0921   Reconstruction               0-003-017  08/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0989   Reconstruction               0-003-018  06/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0858   Reconstruction               0-003-019  02/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1985   Reconstruction               0-003-020  04/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01             780                  07/13/20   09/18/20    AAC CONTRACTING, INC.               
                                                            EC-01               0                  09/24/20   11/09/20    WATSON ELECTRIC, INC.               
                                                            EC-02           8,087                  09/24/20   11/09/20    WATSON ELECTRIC, INC.               
                                                            EC-03             726                  12/01/20   02/01/21    WATSON ELECTRIC, INC.               
                                                            GC-01         -65,500                  01/29/20   02/26/20    WHITTON CONSTRUCTION, LLC           
                                                            GC-02               0                  06/30/20   10/20/20    WHITTON CONSTRUCTION, LLC           
                                                            GC-03               0                  07/13/20   09/18/20    WHITTON CONSTRUCTION, LLC           
                                                            GC-04          -1,779                  07/28/20   09/22/20    WHITTON CONSTRUCTION, LLC           
                                                            GC-05               0                  07/28/20   09/22/20    WHITTON CONSTRUCTION, LLC           
                                                            GC-06               0                  09/24/20   02/10/21    WHITTON CONSTRUCTION, LLC           
                                                            GC-07               0                  11/02/20   02/08/21    WHITTON CONSTRUCTION, LLC           
                                                            GC-08               0                  11/02/20   02/08/21    WHITTON CONSTRUCTION, LLC           
                                                            GC-09               0                  11/02/20   02/08/21    WHITTON CONSTRUCTION, LLC           
                                                            GC-10          24,435                  11/02/20   02/08/21    WGITTON CONSTRUCTION, LLC           
                                                            HVAC-01         5,253                  12/30/20   03/03/21    ENI MECHANICAL, INC.                
                                                            HVAC-02         2,268                  12/30/20   03/03/21    ENI MECHANICAL, INC.                
                                                            PC-01               0                  11/02/20   01/22/21    NORWOOD PLUMBING, INC.              
                                                            PC-02          -1,730                  12/22/20   03/12/21    NORWOOD PLUMBING, INC.              
 
18-0006   Reconstruction               0-003-021  08/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -22,475                  06/13/19   06/19/19    NORTHERN TIER CONTRACTING, INC.     
 
19-0248   Reconstruction               0-003-022  10/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           1,514                  06/10/21   11/09/21    Adams Glass                         
 
19-1059   Reconstruction               0-003-023  09/19/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0566   Reconstruction               0-003-024  01/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0064   Reconstruction               0-003-025  08/26/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          10,800                  07/25/22   05/22/23    Zerodraft of CNY                    
 
21-1158   Reconstruction               0-003-026  02/22/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,000                  06/07/23     /  /      NEP GLASS CO                        
 
22-1606   Reconstruction               0-003-027  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1432EP Energy Project               0-003-E01  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1340FP Reconstruction               0-003-FP1  03/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1437SC Visual Structural Inspection 0-003-SC1  04/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
90-0711   Reconstruction               5-002-001  02/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1839   Reconstruction               5-002-002  11/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1201   Reconstruction               5-002-004  04/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1417   Reconstruction               5-002-005  06/22/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-01            1,000                  01/23/13   04/16/13    SANDS BROTHERS ROOFING CO INC       
                                                            R-02           -4,000                  02/13/13   05/31/13    SANDS BROTHERS ROOFING CO INC       
 
14-0072   Reconstruction               5-002-006  04/08/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -5,000                  08/08/14   08/28/14    Perras Excavating, Inc.             
 
17-0859   Reconstruction               5-002-007  02/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE

POTSDAM CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-29-02-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Potsdam High School:
90-1630   Reconstruction               0-001-005  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0059   Additions and Alterations    0-001-006  08/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0482   Additions and Alterations    0-001-007  01/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1019   Reconstruction               0-001-010  06/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0207   Additions and Alterations    0-001-012  12/14/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  10/19/07   10/26/07    RSI ROOFING                         
                                                            00001               0                  10/19/07   10/26/07    NORTHERN MECHANICALS, INC.          
                                                            00001               0                  10/19/07   10/26/07    BETTE & CRING, LLC                  
                                                            00001               0                  10/19/07   10/26/07    J. E. SHEEHAN                       
                                                            00001               0                  11/16/07   02/05/08    Norwood Plumbing                    
                                                            00002           4,849                  10/19/07   10/26/07    BETTE & CRING, LLC.                 
                                                            00003          -2,200                  10/19/07   10/26/07    BETTE & CRING, LLC                  
                                                            00003           3,975                  05/27/08   02/20/09    Collins & Hammond                   
                                                            00003           1,010                  08/20/08   03/09/09    NORWOOD PLUMBING, INC.              
                                                            00004           5,135                  10/19/07   10/26/07    BETTE & CRING, LLC                  
                                                            00004          12,000                  10/19/07   10/26/07    J. E. SHEEHAN                       
                                                            00004           6,927                  09/24/08   03/19/09    NORWOOD PLUMBING,INC                
                                                            00004           2,202                  06/09/08   02/02/09    The Pike Company                    
                                                            00005           1,987                  10/19/07   02/05/08    BETTE & CRING, LLC                  
                                                            00005             730                  09/24/08   03/19/09    NORWOOD PLUMBING,INC                
                                                            00005          23,543                  10/07/08   08/06/10    COLLINS - HAMMOND                   
                                                            00006             485                  10/19/07   10/26/07    BETTE & CRING, LLC                  
                                                            00006           3,071                  11/18/08   05/15/09    RSI ROOFING                         
                                                            00006           2,400                  02/17/09   06/09/09    COLLINS-HAMMOND                     
                                                            00006           1,308                  03/24/09   06/18/09    NORTHERN MECHANICALS, INC.          
                                                            00007           3,650                  03/24/09   06/18/09    NORTHERN MECHANICALS, INC.          
                                                            00007           1,750                  03/24/09   07/16/09    COLLINS-HAMMOND                     
                                                            00008           1,827                  11/16/07   12/12/07    Bette & Cring LLC                   
                                                            00008           5,363                  03/24/09   07/16/09    NORWOOD PLUMBING, INC.              
                                                            00009           4,408                  03/21/08   03/31/08    King & King Architects              
                                                            00009           1,238                  03/24/09   06/18/09    NORTHERN MECHANICALS, INC.          
                                                            00010         -10,120                  04/17/08   02/18/09    J. E. SHEEHAN                       
                                                            00010         -10,120                  04/17/08     /  /      J.E. SHEEHAN                        
                                                            00010           1,575                  12/03/09   01/07/10    BETTE & CRING LLC                   
                                                            00011           3,990                  05/27/08   08/04/08    J.E Sheehen                         
                                                            00011           2,419                  04/30/09   07/22/09    NORTHERN MECHANICALS INC            
                                                            00011           2,514                  06/03/09   08/13/09    COLLINS-HAMMOND                     
                                                            00012           7,672                  07/08/08   09/29/08    J.E Sheehan                         
                                                            00013           6,656                  01/29/08   03/08/08    BETTE & CRING, LLC                  
                                                            00013          14,940                  08/20/08   08/06/10    J. E. SHEEHAN                       
                                                            00014          31,891                  01/29/08   08/05/08    bette & cring                       
                                                            00014          14,789                  08/20/08     /  /      J. E. SHEEHAN                       
                                                            00014          -4,542                  12/17/09   08/06/10    COLLINS-HAMMOND                     
                                                            00015          19,455                  01/29/08   03/08/08    BETTE & CRING, LLC                  
                                                            00015          58,000                  10/07/08   06/07/10    J. E. SHEEHAN                       
                                                            00015             292                  01/14/10   02/26/10    COLLINS-HAMMOND                     
                                                            00016           7,525                  01/29/08   03/08/08    BETTE & CRING, LLC                  
                                                            00016          82,139                  10/22/08   03/19/09    J. E. SHEEHAN                       
                                                            00016          -9,663                  01/14/10   02/26/10    COLLINS-HAMMOND                     
                                                            00017           2,310                  01/29/08   03/08/08    BETTE & CRING, LLC                  
                                                            00018           4,998                  01/29/08   03/08/08    BEETE & CRING, LLC                  
                                                            00018          13,400                  11/18/08   01/22/09    J.E. SHEEHAN                        
                                                            00020          16,828                  03/11/08   03/19/08    Bette & Cring, LLC.                 
                                                            00023          -7,241                  04/15/08   08/06/08    BETTE & CRING, LLC.                 
                                                            00024          15,901                  05/06/08   08/12/08    BETTE & CRING, LLC                  
                                                            00025           5,108                  04/29/08   09/29/08    BETTE & CRING, LLC                  
                                                            00027          11,896                  06/09/08   01/30/09    The Pike Company                    
                                                            00028           8,830                  06/09/08   01/30/09    The Pike Company                    
                                                            00035           5,692                  08/20/08   04/03/09    BETTE & CRING, LLC                  
                                                            00036           3,733                  10/28/08   01/16/09    BETTE & CRING, LLC                  
                                                            00037          10,721                  10/07/08   11/06/08    BETTE & CRING, LLC                  
                                                            00042          11,305                  01/08/09   06/16/09    BETTE & CRING, LLC                  
                                                            00043           9,499                  11/18/08   05/14/09    BETTE & CRING, LLC                  
                                                            00044             564                  03/09/09   06/08/09    BETTE & CRING, LLC                  
                                                            00045           1,986                  03/09/09   06/08/09    BETTE & CRING, LLC                  
                                                            00046           3,308                  03/18/09   06/17/09    BETTE & CRING, LLC                  
                                                            00048           1,843                  07/09/09   07/12/12    BETTE & CRING                       
                                                            00049           2,274                  07/09/09   07/15/09    BETTE & CRING                       
                                                            00050          -4,542                  12/03/09   01/07/10    BETTE & CRING LLC                   
                                                            00053           7,552                  12/03/09   01/07/10    BETTE & CRING LLC                   
                                                            004               840                  06/19/08   10/07/08    RSI ROOFING                         
                                                            052            82,290                  11/17/09   12/31/09    BETTE & CRING LLC                   
                                                            3               7,140                  03/11/08     /  /      Norwood Plumbing, Incorporated      
                                                            GC-031         27,092                  06/19/08   10/07/08    BETTE AND CRING, LLC                
                                                            HVAC-005        5,360                  06/19/08   02/20/09    Northern Mechanicals                
 
13-0456   Reconstruction               0-001-013  04/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          8,200                  07/06/15   08/05/15    Watson Electric, Inc.               
                                                            EC-002        -15,771                  09/30/15   10/07/15    Watson Electric, Inc.               
                                                            EC-003         10,186                  04/14/16   05/12/16    WATSON ELECTRIC,INC.                
                                                            EC-006            980                  04/14/16   05/12/16    WATSON ELECTRIC, INC.               
                                                            EC-008         14,711                  05/26/16   06/10/16    Watson Electric, Inc.               
                                                            EC-010A         7,652                  12/13/16   02/14/17    Watson Elecric, Inc.                
                                                            GC-002          8,471                  03/10/15   05/08/15    Murnane Building Contractors, Inc.  
                                                            GC-003          2,315                  03/10/15   05/08/15    Murnane Building Contractors, Inc.  
                                                            GC-004        104,700                  05/19/15   05/26/15    Murnane Building Contractors, Inc.  
                                                            GC-005         21,000                  05/19/15   05/26/15    Murnane Building Contractors, Inc.  
                                                            GC-006          7,882                  05/19/15   05/26/15    Murnane Building Contractors, Inc.  
                                                            GC-007         65,300                  07/30/15   08/27/15    Murnane Building Contractors, Inc.  
                                                            GC-008         14,708                  10/07/15   11/17/15    Murnane Building Contractors, Inc.  
                                                            GC-011         12,372                  09/30/15   10/07/15    Murnane Building Contractors, Inc.  
                                                            GC-015         10,824                  12/07/15   01/05/16    MURNANE BUILDING CONTRACTORS,INC    
                                                            GC-018         20,119                  01/13/16   02/16/16    Murnane Building Contractors, Inc.  
                                                            GC-019        104,000                  01/13/16   02/16/16    Murnane Building Contractors, Inc.  
                                                            GC-020         20,657                  01/13/16   02/16/16    Murnane Building Contractors, Inc.  
                                                            GC-024         33,149                  01/13/16   02/16/16    Murnane Building Contractors, Inc.  
                                                            GC-026          4,213                  03/17/16   04/21/16    Murnane Building Contractors, Inc.  
                                                            GC-027         17,221                  03/17/16   04/21/16    Murnane Building Contractors, Inc.  
                                                            GC-031         11,422                  03/17/16   05/12/16    Murnane Building Contractors, Inc.  
                                                            GC-033         -5,987                  10/05/16   11/02/16    Murnane Building Contractors, Inc.  
                                                            GC-036A         2,849                  12/13/16   01/11/17    Murnane Building Contractors, Inc.  
                                                            HC-001         41,100                  08/20/14   03/09/17    Burns Bros Contractors, Inc.        
                                                            HC-002          8,650                  05/19/15   05/26/15    Burns Bros Contractors, Inc.        
                                                            HC-003         23,600                  07/06/15   08/05/15    Burns Bros Contractors, Inc.        
                                                            HC-004         -2,989                  12/22/15   01/08/16    BURNS BROS. CONTRACTING             
                                                            HC-005        -69,880                  10/05/16   10/27/16    Burns Bros Contractors, Inc.        
                                                            PC-001         -7,328                  01/29/15   01/10/17    Burns Bros Contractors, Inc.        
                                                            PC-002         38,700                  05/19/15   01/10/17    Burns Bros Contractors, Inc.        
                                                            PC-003            500                  07/06/15   08/05/15    Burns Bros Contractors, Inc.        
                                                            PC-004         20,615                  12/11/15   01/11/16    Burns Bros Contractors, Inc.        
                                                            SC-001          8,923                  04/14/16   05/12/16    TJ FIACCO CONSTRUCTION,LLC.         
 
12-0934   Reconstruction               0-001-014  04/03/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          25,724                  01/13/14   02/11/14    RSI Roofing, Inc.                   
 
16-1299   Reconstruction               0-001-015  02/28/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -3,300                  07/24/17   07/28/17    Whitton Construction, LLC           
 
21-1500   Reconstruction               0-001-016  11/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-003              0                  06/29/23     /  /      MJ'S CONTRACTING SERVICES           
                                                            AC-01           8,500                  05/08/23   12/28/23    MJ'S CONTRACTING SERVICES           
                                                            AC-05               0                  09/01/23   12/18/23    MJS CONTRACTING SERVICES INC        
                                                            AC-06          -7,391                  09/01/23   12/18/23    MJS CONTRACTING SERVICES INC        
                                                            EC-002         38,400                  05/08/23   12/29/23    S&L ELECTRIC                        
                                                            EC-03               0                  09/20/23     /  /      S&L ELECTRIC                        
                                                            GC-01               0                  08/17/23   12/28/23    MURNANE BUILDING CONTRACTORS        
                                                            GC-03               0                  08/29/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            GC-04          -4,005                  09/01/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            MC-001         35,306                  05/08/23   12/29/23    HYDE-STONE MECHANICAL               
                                                            PC-001         80,356                  05/08/23   12/29/23    HYDE-STONE MECHANICAL               
 
20-1676   Reconstruction               0-001-017  12/14/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          5,663                  02/24/22   02/17/23    Murnane Bldg Contrs Inc             
                                                            GC-002            606                  04/19/22   05/04/23    Murnane Bldg Contrs Inc             
                                                            GC-003         10,421                  05/04/22   05/09/23    Murnane Bldg Contrs Inc             
 
21-1913   Reconstruction               0-001-018  07/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0573EP Energy Project               0-001-E01  01/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1208FP Reconstruction               0-001-FP1  03/13/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lawrence Ave. Elementary:
90-1631   Reconstruction               0-002-005  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0483   Additions and Alterations    0-002-006  01/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1018   Reconstruction               0-002-009  06/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0208   Reconstruction               0-002-011  12/14/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           1,294                  05/27/08   02/20/09    Collins & Hammond                   
                                                            00003          22,092                  10/19/07   10/26/07    J. E. SHEEHAN                       
                                                            00004          34,155                  04/29/08   08/06/10    NORTHERN MECHANICALS, INC.          
                                                            00005           7,041                  10/19/07   02/05/08    J. E. SHEEHAN                       
                                                            00006          36,500                  11/05/07   12/12/07    J.E. Sheehan Contracting            
                                                            00006           1,380                  09/24/08   03/19/09    NORWOOD PLUMBING,INC                
                                                            00007           4,998                  11/05/07   12/12/07    J.E. Sheehan                        
                                                            00007          28,921                  11/16/07   02/05/08    Bette & Cring                       
                                                            00007          17,900                  03/24/09   06/18/09    RSI ROOFING                         
                                                            00007             383                  03/24/09   06/18/09    NORWOOD PLUMBING, INC.              
                                                            00008           2,400                  03/24/09   06/25/09    RSI ROOFING                         
                                                            00009           1,664                  03/24/09   06/18/09    COLLINS-HAMMOND                     
                                                            00010           3,963                  11/05/07   11/14/07    Bette & Cring                       
                                                            00010           1,983                  04/30/09   07/22/09    NORTHERN MECHANICALS INC            
                                                            00012           2,760                  01/29/08   03/08/08    BETTE & CRING, LLC                  
                                                            00012           1,054                  06/03/09   08/13/09    COLLINS-HAMMOND                     
                                                            00019          86,100                  02/28/08   04/11/08    bette & cring                       
                                                            00021           4,382                  03/11/08   08/12/08    Bette & Cring, LLC.                 
                                                            00022          81,200                  03/21/08   03/31/08    King & King Architects              
                                                            00026          24,391                  04/29/08   08/07/08    BETTE & CRING, LLC                  
                                                            00029           8,808                  06/09/08   02/02/09    The Pike Company                    
                                                            00030           7,928                  06/09/08   01/26/09    The Pike Company                    
                                                            00032          10,109                  07/08/08   08/26/08    Bette & Cring,LLC                   
                                                            00033          11,695                  08/20/08   03/09/09    BETTE & CRING, LLC                  
                                                            00034          13,079                  08/20/08   03/09/09    BETTE & CRING, LLC                  
                                                            00038           3,954                  10/07/08   11/06/08    BETTE & CRING, LLC                  
                                                            00041           2,013                  10/28/08   01/16/09    BETTE & CRING, LLC                  
                                                            00047           4,521                  04/30/09   07/22/09    BETTE & CRING LLC                   
                                                            00051          27,096                  11/17/09   12/31/09    BETTE & CRING LLC                   
                                                            HVAC-013        7,559                  10/18/10   11/05/10    NORTHERN MECHANICALS INC            
                                                            HVAC-014       26,137                  10/18/10   11/05/10    NORTHERN MECHANICALS INC            
 
13-0458   Reconstruction               0-002-012  04/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-005         18,942                  04/14/16   05/12/16    WATSON ELECTRIC,INC.                
                                                            EC-007          2,730                  04/28/16   09/30/16    WATCHDOG BUILDING PARTNERS          
                                                            EC-010C         7,652                  12/13/16   02/14/17    Watson Electric, Inc.               
                                                            GC-016           -453                  01/13/16   02/09/16    Murnane Building Contractors, Inc.  
                                                            GC-023          2,157                  01/13/16   02/09/16    Murnane Building Contractors, Inc.  
                                                            GC-029            371                  03/17/16   04/21/16    Murnane Building Contractors, Inc.  
                                                            GC-032         33,282                  03/17/16   05/12/16    Murnane Building Contractors, Inc.  
                                                            GC-035          4,050                  10/05/16   10/27/16    Murnane Building Contractors, Inc.  
                                                            GC-036C           610                  12/13/16   01/11/17    Murnane Building Contractors, Inc.  
 
12-0935   Reconstruction               0-002-013  04/03/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02           4,413                  01/13/14   02/11/14    RSI Roofing, Inc.                   
 
17-1868   Reconstruction               0-002-014  06/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -5,000                  06/26/19   07/01/19    NORTHERN TIER CONTRACTING, INC.     
 
20-0137   Reconstruction               0-002-015  08/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          4,943                  03/25/21   06/22/21    CONTINENTAL CONSTRUCTION, LLC       
 
21-1501   Reconstruction               0-002-016  11/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02               0                  08/17/23   12/28/23    MURNANE BUILDING CONTRACTORS        
                                                            SC-001        -78,000                  05/19/23   12/27/23    J.E SHEEHAN CONTRACTING CORP        
 
94-0574EP Energy Project               0-002-E01  01/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1204FP Reconstruction               0-002-FP1  03/13/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
92-0846   Reconstruction               0-005-004  04/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0484   Additions and Alterations    0-005-006  01/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1020   Reconstruction               0-005-009  06/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0209   Reconstruction               0-005-011  12/14/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           3,037                  10/19/07   10/26/07    RSI ROOFING                         
                                                            00002           7,690                  10/19/07   10/26/07    J. E. SHEEHAN                       
                                                            00002           3,623                  10/31/07   01/16/08    NORTHERN MECHANICALS,INC            
                                                            00003           5,000                  10/31/07   01/16/08    RSI ROOFING                         
                                                            00005           1,006                  10/07/08   12/04/08    RSI ROOFING                         
                                                            00008             800                  03/24/09   06/18/09    NORTHERN MECHANICALS, INC.          
                                                            00008           1,964                  03/31/09   07/03/09    COLLINS-HAMMOND                     
                                                            00009           3,846                  10/31/07   11/14/07    BETTE & CRING,LLC                   
                                                            00010           1,340                  06/03/09   08/13/09    COLLINS-HAMMOND                     
                                                            00011          10,902                  11/05/07   11/15/07    Bette & Cring                       
                                                            00011             857                  12/03/09   01/07/10    NORWOOD PLUMBING INC                
                                                            00017          19,000                  10/22/08   03/19/09    J. E. SHEEHAN                       
                                                            00019          33,394                  01/14/09   02/27/09    J.E. SHEEHAN                        
                                                            00039           3,629                  10/07/08   11/06/08    BETTE & CRING, LLC                  
                                                            00040           4,620                  10/28/08   01/16/09    BETTE & CRING, LLC                  
                                                            HVAC-015        6,969                  10/18/10   11/05/10    NORTHERN MECHANICALS INC            
                                                            HVAC-016            0                  04/11/11   05/13/11    NORTHERN MECHANICAL INC             
 
13-0457   Reconstruction               0-005-012  04/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-004          4,593                  04/14/16   05/12/16    WATSON ELECTRIC,INC.                
                                                            EC-010B         7,652                  12/13/16   02/14/17    Watson Electric, Inc.               
                                                            GC-001         96,500                  08/20/14   09/24/14    Murnane Building Contractors, Inc.  
                                                            GC-009          1,541                  10/07/15   11/17/15    Murnane Building Contractors, Inc.  
                                                            GC-012          7,911                  09/30/15   10/07/15    Murnane Building Contractors, Inc.  
                                                            GC-013          8,905                  11/25/15   01/07/16    Murnane Building Contractors, Inc.  
                                                            GC-014         12,753                  11/25/15   01/07/16    Murnane Building Contractors, Inc.  
                                                            GC-017         20,000                  01/13/16   02/09/16    Murnane Building Contractors, Inc.  
                                                            GC-021         13,798                  01/13/16   02/16/16    Murnane Building Contractors, Inc.  
                                                            GC-025         16,681                  03/17/16   05/09/16    Murnane Building Contractors, Inc.  
                                                            GC-028          4,130                  03/17/16   04/21/16    Murnane Building Contractors, Inc.  
                                                            GC-034          2,336                  10/05/16   10/27/16    Murnane Building Contractors        
                                                            GC-036B           570                  12/13/16   01/11/17    Murnane Building Contractors, Inc.  
 
12-0936   Reconstruction               0-005-013  04/03/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1681   Reconstruction               0-005-014  05/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -5,000                  09/20/17   10/13/17    Whitton Construction, LLC           
 
18-0892   Reconstruction               0-005-015  01/11/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1502   Reconstruction               0-005-016  11/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-02          73,250                  05/08/23   12/28/23    MJ'S CONTRACTING SERVICES           
                                                            AC-04          41,500                  09/01/23     /  /      MJS CONTRACTING SERVICES INC        
                                                            EC-001         22,000                  05/08/23   12/29/23    S&L ELECTRIC                        
                                                            EC-001         22,000                  05/08/23     /  /      S&L ELECTRIC                        
                                                            GC-05               0                  09/01/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            MC-002        104,575                  05/08/23   12/29/23    HYDE-STONE MECHANICAL               
                                                            PC-02          23,774                  05/08/23   12/29/23    HYDE-STONE MECHANICAL               
 
94-0575EP Energy Project               0-005-E01  01/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1205FP Reconstruction               0-005-FP1  03/13/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Special Education Svcs Building:
14-0463   Reconstruction               0-011-002  04/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -5,000                  02/08/16   04/12/16    S&L Electrical, Inc.                
                                                            GC-001        -13,233                  03/17/16   04/11/16    Northern Tier Contracting, Inc.     
 
17-1563   Reconstruction               0-011-004  03/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1503   Reconstruction               0-011-005  11/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
93-0593   Reconstruction               5-004-001  01/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1632   Reconstruction               5-004-002  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0576   Reconstruction               5-004-006  01/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1021   Reconstruction               5-004-007  06/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0210   Reconstruction               5-004-009  12/14/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003             700                  11/16/07   02/05/08    Northern Mechanicals                
                                                            00008           3,400                  11/05/07   12/12/07    J.E. Sheehan                        
 
13-0459   Reconstruction               5-004-010  04/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-009         13,626                  05/26/16   06/10/16    WATSON ELECTRIC                     
                                                            GC-010         24,277                  10/07/15   11/17/15    Murnane Building Contractors, Inc.  
                                                            GC-022          6,351                  01/13/16   02/09/16    Murnane Building Contractors, Inc.  
                                                            GC-030          7,098                  03/17/16     /  /      Murnane Building Contractors, Inc.  
                                                            GC-036D            41                  12/13/16   01/11/17    Murnane Building Contractors, Inc.  
                                                            SC-002         14,659                  10/05/16   10/27/16    TJ Fiacco Construction, LLC         
 
12-0937   Reconstruction               5-004-011  04/03/13  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1504   Additions and Alterations    5-004-012  11/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04               0                  09/20/23     /  /      S&L ELECTRIC                        
                                                            HC-001          7,950                  08/04/23   12/29/23    J.E SHEEHAN CONRACTING CORP         
 

          Press Box:
06-0211   New Construction             7-010-001  12/14/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00013           2,236                  07/09/09   07/15/09    COLLINS-HAMMOND                     
 

          District-Wide:
15-1221   Reconstruction               7-999-002  02/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0577EP Energy Project               7-999-E01  01/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE

EDWARDS-KNOX CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-31-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Central Building:
00-1481   Additions and Alterations    0-004-005  12/26/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               5,870                  07/30/02   08/28/02    Collins-Hammond Elec.               
                                                            1              54,300                  08/02/02   08/16/02    AR Mack Const.                      
                                                            1              14,962                  11/10/03   11/21/03    Empire Northeast                    
                                                            1               3,768                  03/02/04   03/04/04    Skelly Contractors                  
                                                            1               6,123                  06/14/04   07/14/04    Sands Brothers Roofing              
                                                            10             10,526                  12/13/04   01/10/05    Collins Hammond Elec.               
                                                            2               5,229                  01/08/03   01/23/03    Collins-Hammond Elec.               
                                                            2               3,800                  11/10/03   11/21/03    Sands Brothers Roofing              
                                                            2              10,235           6,500  03/02/04   04/08/04    Empire Northeast                    
                                                            2              11,710                  06/14/04   07/14/04    AR Mack Const.                      
                                                            2              16,477                  09/13/05   09/22/05    Empire Northeast                    
                                                            3              24,893                  11/10/03   11/21/03    Collins-Hammond Elec.               
                                                            3              32,000                  08/11/04   08/13/04    Empire Northeast                    
                                                            3               5,387                  11/10/05   05/14/07    A.R. MACK CONSTRUCTION COMPANY      
                                                            4              15,949                  11/10/03   11/21/03    AR Mack Const.                      
                                                            4              15,010          15,010  05/14/04   07/14/04    Collins Hammond Elec.               
                                                            5              19,613           3,922  05/14/04   07/14/04    Collins Hammond Elec.               
                                                            5              13,300                  06/14/04   07/14/04    AR Mack Const.                      
                                                            6               1,200                  04/09/04   05/15/07    Collins Hammond Elec.               
                                                            6              27,940           5,588  05/14/04   07/14/04    AR Mack Const.                      
                                                            7               5,359                  07/07/04   07/15/04    AR Mack Const.                      
                                                            7               2,900                  08/05/04   08/10/04    Collins Hammond Elec.               
                                                            8              18,437                  07/07/04   07/22/04    Collins Hammond Elec.               
                                                            9              15,875                  12/13/04   05/15/07    Collins Hammond Elec.               
 
05-0284   Reconstruction               0-004-006  10/26/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            3,200                  09/27/06   01/09/07    Aquatic renovation Systems          
                                                            2-01           -2,079                  06/16/06   11/16/06    Northern mechanical                 
 
05-0285   Reconstruction               0-004-007  10/26/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1665   Reconstruction               0-004-009  03/20/08  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0684   Reconstruction               0-004-010  06/09/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-07                0                  11/25/15   12/23/15    Black River Plumbing, Heating & AC  
                                                            E-08                0                  11/25/15   12/23/15    Black River Plumbing, Heating & AC  
                                                            E-09                0                  11/25/15   12/23/15    Black River Plumbing, Heating & AC  
                                                            E-10                0          20,299  04/04/16   04/13/16    Black River Plumbing, Heating & AC  
                                                            E-11                0           5,713  04/04/16   10/13/16    Black River Plumbing, Heating & AC  
                                                            E-12                0          10,222  04/04/16   04/13/16    Black River Plumbing, Heating & AC I
                                                            E-13                0                  04/04/16   04/13/16    Black River Plumbing, Heating & AC I
                                                            E-14                0                  04/04/16   04/13/16    Black River Plumbing, Heating & AC I
                                                            E-19            1,438                  01/17/17     /  /      Black River Plumbing,Heating & AC   
                                                            E-20           16,359                  07/11/16   10/06/16    Black River Plumb, Heat, & A/C, Inc.
                                                            E-21            9,173                  07/11/16   10/06/16    Black River Plumb, Heat, & A/C, Inc.
                                                            E-22           20,250                  07/11/16   10/06/16    Black River Plumb, Heat, & A/C, Inc.
                                                            GC-010              0                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            GC-03               0                  03/18/15   04/01/15    Northern Tier Contracting, Inc.     
                                                            GC-04               0                  08/10/15   08/26/15    Northern Teir Contracting Inc.      
                                                            GC-05          -3,300                  08/10/15   08/26/15    Northern Tier Contracting Inc.      
                                                            GC-06               0                  08/10/15   08/26/15    Northern Tier Contracting Inc.      
                                                            GC-07               0                  08/10/15   08/26/15    Northern Tier Contracting Inc.      
                                                            GC-08               0                  08/10/15   08/26/15    Northern Tier Contracting Inc.      
                                                            GC-09               0                  08/10/15   08/26/15    Northern Tier Contracting Inc.      
                                                            GC-11               0                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            GC-12               0                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            GC-14          25,715                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            GC-15          29,549                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            GC-16          26,012                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            GC-17          30,115                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            GC-18           9,052                  10/30/15   10/13/16    Northern Tier Contracting, Inc.     
                                                            GC-19               0                  11/06/15   11/30/15    Northern Tier Contracting, Inc.     
                                                            GC-20          10,290                  02/12/16   02/25/16    Northern Tier Contracting, Inc.     
                                                            GC-21          12,112                  02/12/16   02/25/16    Northern Tier Contracting, Inc.     
                                                            GC-22            -101                  02/12/16   10/13/16    Northern Tier Contracting, Inc.     
                                                            GC-23          12,689                  07/15/16   10/06/16    NORTHERN TIER CONTRACTING INC       
                                                            HVAC-01         1,300                  03/18/15   04/01/15    Northern Mechanicals Inc.           
                                                            HVAC-02        16,721                  11/06/15   11/30/15    Northern Mechanicals, Inc.          
                                                            HVAC-04         1,305                  11/20/15   12/23/15    Northern Mechanicals, Inc.          
                                                            HVAC-05        10,055                  03/17/16   03/24/16    Northern Mechanicals, Inc.          
                                                            P-01            3,011                  03/18/15   04/01/15    Norwood Plumbing Inc.               
                                                            P-02            6,653                  11/06/15   11/30/15    Norwood Plumbing, Inc.              
                                                            P-03            6,175                  11/20/15   12/23/15    Norwood Plumbing, Inc.              
                                                            P-04              934                  11/20/15   12/23/15    Norwood Plumbing, Inc.              
                                                            PV-02          -2,590                  07/15/16   10/06/16    iNVICTUS ELECTRIC                   
                                                            ST-01         -10,000                  07/15/16   10/06/16    FOURTH COAST                        
 
15-1423   Reconstruction               0-004-011  04/04/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01                0                  02/17/17   02/24/17    Watson Electric, Inc.               
                                                            E-02           -1,120                  02/17/17   02/24/17    Watson Electric, Inc.               
                                                            R-01                0                  02/22/17   02/24/17    Sands Brothers Roofing Co.          
                                                            R-02          -39,175                  02/22/17   02/24/17    Sands Brothers Roofing Co., Inc.    
 
15-1509   Reconstruction               0-004-012  10/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           1,568                  01/29/18     /  /      Tel, Inc.                           
                                                            GC-01               0                  11/24/17   03/08/18    Continental Construction            
                                                            GC-02          10,886                  01/22/18   02/05/18    Continental Construction            
                                                            GC-03          11,947                  04/05/18   04/12/18    Continental Construction            
                                                            PC-01               0                  01/29/18   03/08/18    Norwood Plumbing, Inc.              
                                                            PC-02           5,361                  01/29/18   03/08/18    Norwood Plumbing, Inc.              
                                                            PC-03           9,473                  01/29/18   03/08/18    Norwood Plumbing, Inc.              
 
15-1862   Reconstruction               0-004-013  06/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,437                  06/05/17   06/06/17    Continental Construction, LLC       
                                                            GC-02          -4,000                  06/05/17   06/06/17    Continental Construction, LLC       
 
17-0029   Reconstruction               0-004-014  12/11/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           6,858                  07/30/18   08/06/18    CONTINENTAL CONSTRUCTION LLC        
                                                            P-01           -4,000                  07/18/18   06/06/19    LAWMAN HEATING & COOLING INC        
 
18-0010   Reconstruction               0-004-015  08/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          19,660                  02/26/19   03/13/19    CONTINENTAL CONSTRUCTION,LLC        
                                                            GC-02          18,735                  06/03/19   06/04/19    CONTINENTAL CONSTRUCTION, LLC       
 
19-0211   Reconstruction               0-004-016  10/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  08/24/20   10/30/20    TEL, INC.                           
                                                            EC-02               0                  01/26/21   04/08/21    TEL, INC.                           
                                                            EC-03               0                  01/26/21   04/08/21    TEL, INC.                           
                                                            EC-04               0                  01/26/21   04/08/21    TEL, INC.                           
                                                            EC-05            -666                  06/04/21     /  /      TEL, Inc                            
                                                            GC-01               0                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-02          -1,001                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-03               0                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-04               0                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-06               0                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-07               0                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-08               0                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-09          16,158                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-10          18,470                  08/24/20   11/05/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-11          28,081                  08/24/20   11/05/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-12          20,201                  08/24/20   11/05/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-13          17,965                  08/24/20   11/05/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-14          12,140                  09/18/20   11/12/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-15          11,935                  09/18/20   11/12/20    CON TECH BUILDING SYSTEMS, INC.     
                                                            GC-16           5,190                  01/28/21   04/09/21    CON TECH BUILDING SYSTEMS, INC.     
                                                            HVAC-01             0                  03/05/21   04/29/21    HYDE-STONE MECHANICAL CONTRACTORS, I
                                                            HVAC-02             0                  01/22/21   04/09/21    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            HVAC-03             0                  06/04/21   03/24/22    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            HVAC-04       -19,958                  06/04/21   03/24/22    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            PC-01               0                  07/13/20   08/17/20    HYDE-STONE MECHANICAL CONTRACTORS,IN
                                                            PC-02           5,384                  09/18/20   11/12/20    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            PC-03          10,457                  01/28/21   03/24/21    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            PC-04           9,594                  01/26/21   04/08/21    HYDE-STONE MECHANICAL CONTRACTORS   
                                                            PC-05           5,640                  01/26/21   04/08/21    HYDE-STONE MECHANICAL CONTRACTORS   
 
19-0339   Reconstruction               0-004-017  11/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  07/13/20   08/26/20    CONTINENTAL CONSTRUCTION, LLC       
 
20-0380   Reconstruction               0-004-018  12/07/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,000                  07/15/21   12/21/21    Northern Tier Contracting Inc       
 
20-1714   Reconstruction               0-004-019  08/10/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-004          2,307                  10/17/22   05/16/23    ENI Mech Inc                        
                                                            EC-01               0                  04/04/22   03/03/23    ENI Mech Inc                        
                                                            EC-02           6,795                  08/22/22   04/18/23    ENI Mech Inc                        
                                                            EC-03           2,208                  10/11/22   07/11/23    ENI Mechanical, Inc.                
                                                            GC-01               0                  04/04/22   03/07/23    Continental Const LLC               
                                                            GC-02               0                  10/11/22   12/06/23    Continental Const LLC               
                                                            GC-03             562                  10/17/22   05/16/23    Continental Const LLC               
                                                            HC-01         -12,000                  10/31/22   12/13/23    Northern Mech Inc                   
                                                            PC-01           2,754                  10/17/22   05/16/23    ENI Mech Inc                        
 
22-0446   Reconstruction               0-004-020  11/14/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           5,558                  06/07/23     /  /      CONTINENTAL CONST.                  
 
23-0065   Reconstruction               0-004-021  12/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0733FP Reconstruction               0-004-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Boiler House - Biomass Renvovations:
23-0159   Reconstruction               0-011-002  09/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
00-1480   Additions and Alterations    5-005-003  12/26/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              8,171                  09/13/05   09/22/05    Empire Northeast                    
                                                            1-01            6,566                  04/28/05   03/28/07    Con Tech Building Sytems            
                                                            2-002           1,545                  08/22/05   08/25/05    Empire Northeast                    
 
13-0685   Reconstruction               5-005-004  06/09/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-02                0                  09/04/15   09/09/15    Black River Plumbing Heating & AC   
                                                            E-03                0                  09/04/15   09/09/15    Black River Plumbing Heating & AC   
                                                            E-05                0                  09/04/15   09/09/15    Black River Plumbing Heating & AC   
                                                            E-06           -2,714                  09/04/15   09/09/15    Black River Plumbing Heating & AC   
                                                            EC-04               0                  09/04/15   09/09/15    Black River Plumbing Heating & AC   
                                                            GC-01               0                  03/18/15   04/01/15    Northern Tier Contracting, Inc.     
                                                            GC-02               0                  03/18/15   04/01/15    Northern Tier Contracting, Inc.     
                                                            GC-13          13,173                  10/30/15   12/01/15    Northern Tier Contracting, Inc.     
                                                            HVAC-03        14,137                  11/06/15   11/30/15    Northern Mechanicals, Inc.          
 
20-1903   Reconstruction               5-005-005  07/07/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           6,910                  04/26/22   05/09/23    Con Tech Bldg Systems Inc           
 
23-0066   Reconstruction               5-005-006  12/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Boiler House/Biomass Bldg:
07-2266   New Construction             7-011-001  01/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -77,573                  10/23/09   03/19/10    CONTINENTAL CONSTRUCTION            
                                                            1-02           25,540                  11/02/09   03/12/10    CONTINENTAL CONSTRUCTION            
                                                            1-03           14,145                  03/29/10   05/28/10    CONTINENTAL CONSTRUCTION            
                                                            1-04           26,613                  01/27/10   04/30/10    CONTINENTAL CONSTRUCTION            
                                                            2-01           24,930                  11/02/09   03/12/10    B-S INDUSTRIAL CONTRACTORS          
                                                            2-02           15,934                  11/02/09   03/12/10    B-S INDUSTRIAL CONTRACTORS          
                                                            2-03           13,279                  12/02/09   12/23/09    B-S INDUSTRIAL CONTRACTORS          
                                                            2-04           19,500                  02/02/10   12/28/10    B-S INDUSTRIAL CONTRACTORS          
                                                            2-05            1,643                  03/22/10   06/14/10    B-S INDUSTRIAL CONTRACTORS          
                                                            4-01           36,049                  03/05/10   04/23/10    34 & COMPANY INC                    
                                                            4-02           10,311                  03/05/10   04/23/10    34 & COMPANY INC                    
                                                            4-03           13,048                  03/05/10   04/23/10    34 & COMPANY INC                    
                                                            5-02            3,851                  01/27/10   03/19/10    TJ FIACCO CONSTRUCTION              
 

          Fabric Storage Structure:
19-0621   New Construction             7-012-001  11/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-05               0                  07/15/20   09/18/20    CON TECH BUILDING SYSTEMS, INC.     
 

          Concessions&Restroom:
23-0067   New Construction             7-013-001  12/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE

BOCES ST. LAWRENCE-LEWIS STATUS REPORT ON CAPITAL PROJECTS
District No.: 51-90-00-00
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Seaway Tech Ctr. Health Occupations:
93-0410   Reconstruction               0-007-002  11/18/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0193   Reconstruction               0-007-003  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0323   Reconstruction               0-007-004  04/17/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Richville Opportunity Center:
92-1240   Reconstruction               0-011-003  05/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0194   Reconstruction               0-011-004  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Seaway Tech Center- Main Building:
90-1054   Reconstruction               0-012-003  04/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0195   Reconstruction               0-012-004  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0120   Reconstruction               0-012-005  09/26/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0216   Reconstruction               0-012-006  02/01/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001           9,922                  11/27/07   12/12/07    Bette & Cring,llc                   
                                                            1-004           1,716                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-008           5,894                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-009           4,264                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-013          33,912                  05/21/08   08/07/08    BETTE & CRING, LLC.                 
                                                            1-017           2,667                  05/21/08   08/07/08    BETTE & CRING, LLC.                 
                                                            1-019          10,388                  08/27/08   10/21/08    Bette & Cring, LLC                  
                                                            2-004          20,033                  11/19/08   07/20/09    NORTHERN MECHANICALS                
                                                            2-005          24,491                  11/19/08   07/20/09    NORTHERN MECHANICAL                 
                                                            2-006           2,900                  11/19/08   05/15/09    NORTHERN MECHANCIAL                 
                                                            2-007             677                  01/28/09   07/07/09    NORTHERN MECHANCIALS                
                                                            3-002          23,807                  10/30/07   01/16/08    Empire Northeast                    
                                                            3-004           1,012                  07/16/08   05/11/09    EMPIRE NORTHEAST                    
                                                            4-003           3,649                  01/17/08   04/04/08    S&L ELECTRIC                        
                                                            4-004           5,645                  02/21/08   04/04/08    S & L ELECTRIC                      
                                                            4-008          10,429                  03/31/08   04/04/08    S&L ELECTRIC                        
                                                            4-010           3,516                  03/31/08   04/07/08    S&L ELECTRIC                        
                                                            4-014           1,345                  08/27/08   05/11/09    S&L Electric                        
                                                            4-02           10,583                  02/28/08   04/14/09    SEAWAY TECH                         
                                                            5-001          37,466                  01/03/08   01/11/08    Danko Construction                  
                                                            5-003           4,811                  01/17/08   01/28/08    DANKO CONSTRUCTION CORP             
 
08-1436   Reconstruction               0-012-007  05/22/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -20,000                  11/12/10   11/26/10    L&M ENTERPRISES LLC                 
                                                            2-01           -7,314                  11/12/10   11/22/10    JORDSTAT CONSTRUCTION INC           
 
13-0977   Reconstruction               0-012-010  06/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,162                  03/27/17   07/14/17    Continental Construction            
                                                            E1              9,350                  03/27/17   04/12/17    TEL, Inc.                           
                                                            M1             -5,000                  03/27/17   04/12/17    Northern Mechanicals, Inc.          
                                                            P3R            -3,289                  03/27/17   04/12/17    Hyde-Stone Mechanical Contractors   
 
19-0577   Reconstruction               0-012-011  02/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          31,676                  01/28/22   11/08/22    S&L Elec Inc                        
                                                            EC-02           2,176                  02/14/22   02/13/23    S&L Elec Inc                        
                                                            FSE-02         -1,246                  05/06/22   05/22/23    Joseph Flihan Co                    
                                                            GC-01          33,018                  07/29/21   04/06/22    WHITTON CONSTRUCTION, LLC           
                                                            GC-02          29,741                  08/18/21     /  /      WHITTON CONSTRUCTION, LLC           
                                                            GC-03          33,829                  09/16/21   12/01/22    Whitton Construction, LLC           
                                                            GC-04           2,594                  09/16/21   12/01/22    Whitton Construction, LLC           
                                                            GC-05          24,643                  10/21/21   08/02/22    Whitton Const, LLC                  
                                                            GC-06          19,507                  10/21/21   08/02/22    Whitton Const, LLC                  
                                                            GC-07          22,470                  10/21/21   08/02/22    Whittion Const, LLC                 
                                                            GC-08          20,369                  10/21/21   08/02/22    Whitton Const, LLC                  
                                                            GC-09          28,268                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-10          20,670                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-11          21,027                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-12          26,449                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-13          23,536                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-14          33,583                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-15           6,560                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-16           8,337                  12/01/21   12/22/22    Whitton Const LLC                   
                                                            GC-17          34,919                  01/28/22   02/03/23    Whitton Const LLC                   
                                                            MC-01         -63,374                  05/06/22   03/13/23    Northern Mech Inc                   
                                                            PC-01          25,699                  07/29/21   03/29/22    NORWOOD PLUMBING                    
                                                            PC-04          11,287                  09/16/21   12/01/22    Norwood Plumbing                    
                                                            PC-05          17,502                  01/28/22   11/08/22    Norwood Plumb                       
                                                            PC-08             130                  02/14/22   02/13/23    Norwood Plumb                       
                                                            RC-02          -3,617                  05/06/22   05/22/23    PTL Contr Corp                      
                                                            SC-01           3,242                  07/29/21   04/06/22    BARRETT PAVING MATERIALS, INC       
                                                            SC-02          25,296                  07/29/21   04/06/22    BARRETT PAVING MATERIALS, INC       
                                                            SC-03          21,951                  08/05/21   04/13/22    BARRETT PAVING MATERIALS            
                                                            SC-04          33,198                  08/18/21   04/20/22    BARRETT PAVING MATERIALS, INC       
                                                            SC-05          33,045                  09/16/21   12/01/22    Barrett Paving Materials, Inc       
                                                            SC-06          11,126                  10/21/21   12/06/22    Barett Paving Materials, Inc        
                                                            SC-07          31,966                  12/01/21   12/16/22    Barrett paving Materials Inc        
                                                            SC-08           5,901                  01/28/22   11/08/22    Barrett Paving Mat Inc              
 
20-0860   Reconstruction               0-012-012  03/02/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Southwest Technical Ctr.- Main Bldg.:
93-1600   Reconstruction               0-013-002  11/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0196   Reconstruction               0-013-003  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0121   Reconstruction               0-013-004  09/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-005           4,844                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-007           5,426                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-010           2,797                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-014          33,912                  05/21/08   08/07/08    BETTE & CRING, LLC.                 
                                                            1-015             483                  05/21/08   08/07/08    BETTE & CRING, LLC.                 
                                                            1-016           2,667                  05/21/08   08/07/08    BETTE & CRING, LLC.                 
                                                            2-001          10,999                  04/14/08   04/18/08    NORTHERN MECHANICAL                 
                                                            3-003           3,042                  05/21/08   08/07/08    EMPIRE NORTHEAST                    
                                                            4-001           2,548                  01/17/08   01/28/08    S&L ELECTRIC                        
                                                            4-006           7,672                  02/21/08   03/07/08    S & L ELECTRIC                      
                                                            4-009          18,000                  03/31/08   04/07/08    S&L ELECTRIC                        
                                                            4-011          10,359                  03/31/08   04/07/08    S&L ELECTRIC                        
                                                            4-015           5,500                  10/15/08   05/14/09    S & L ELECTRIC, INC.                
                                                            4-02            5,544                  02/28/08   04/14/09    SOUTHWEST TECH                      
 
06-0217   Reconstruction               0-013-005  02/01/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2078   Reconstruction               0-013-006  01/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -19,542                  12/18/09   12/13/11    FIACCO & RILEY CONSTRUCTION         
 
09-0560   Additions and Alterations    0-013-007  06/02/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            8,635                  09/20/10   09/29/10    CONTINENTAL CONSTRUCTION            
                                                            1-01                0                  01/02/15   01/08/15    Continental Construction            
                                                            1-01                0                  01/02/15   01/08/15    Continental Construction            
                                                            1-02              596                  10/20/10   11/05/10    CONTINENTAL CONSTRUCTION            
                                                            1-02                0                  01/02/15   01/08/15    Continental Construction            
                                                            1-03           20,849                  12/07/10   12/28/10    CONTINENTAL CONSTRUCTION            
                                                            1-04          -16,565                  06/13/11   07/21/11    CONTINENTAL CONSTRUCTION            
                                                            2-01           -5,920                  06/03/11   07/21/11    NORTHERN MECHANICALS INC            
                                                            2-01                0                  01/02/14   01/08/15    Nothern Mechanicals, Inc.           
                                                            3-01           -3,000                  04/08/11   05/05/11    PERRAS EXCAVATING INC               
                                                            4-01             -513                  04/26/11   05/19/11    34 & COMPANY INC                    
                                                            4-01                0                  01/02/15   01/08/15    34 & Company, Inc.                  
 
13-0976   Reconstruction               0-013-008  04/18/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0771   Reconstruction               0-013-009  09/12/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           8,554                  02/20/18   04/25/18    Northern Pioneer Contractors        
                                                            GC-01           2,752                  02/20/18   02/28/18    Continental Construction, LLC       
                                                            GC-02           1,437                  02/20/18   02/28/18    Continental Construction, LLC       
                                                            GC-03           9,769                  02/20/18   02/28/18    Continental Construction, LLC       
                                                            MC-01          11,170                  02/20/18   04/25/18    ENI Mechanical Inc.                 
                                                            MC-02           4,990                  06/28/18   07/24/18    ENI MECHANICAL INC                  
                                                            PC-01          -3,307                  02/20/18   04/25/18    Hyde-Stone Mechanical Contractors   
 
16-1196   Reconstruction               0-013-010  02/10/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-01           -1,694                  02/20/18   02/28/18    T.J. Fiacco Construction            
 
19-0578   Reconstruction               0-013-011  02/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          12,526                  12/01/21     /  /      ENI Mech Inc                        
                                                            EC-02          76,114                  12/01/21   12/16/22    ENI Mech Inc                        
                                                            EC-03          26,201                  02/14/22   02/13/23    ENI Mech Inc                        
                                                            FSE-03         -2,876                  05/06/22   05/22/23    Joseph Flihan Co                    
                                                            GC-01          21,244                  08/18/21   05/22/23    NORTHERN TIER CONTRACTING, INC      
                                                            GC-02          25,152                  02/14/22   02/14/23    Northern Tier Contr Inc             
                                                            MC-01        -119,106                  05/06/22   03/13/23    Lawman Heat&Cooling                 
                                                            PC-01          23,143                  07/29/21   04/06/22    ENI MECHANICAL, INC                 
                                                            PC-02          23,525                  02/14/22   12/16/22    ENI Mech Inc                        
                                                            PC-03          23,354                  02/14/22   02/13/23    ENI Mech Inc                        
                                                            RC-01           4,884                  02/14/22   02/14/23    PTL Contr Corp                      
                                                            SC-01           2,200                  05/06/22   05/22/23    TJ Fiacco Const                     
 
20-0861   Reconstruction               0-013-012  03/02/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Northwest Technical Ctr.- Main Bldg.:
90-1055   Reconstruction               0-014-002  04/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1601   Reconstruction               0-014-003  11/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0197   Reconstruction               0-014-004  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0122   Reconstruction               0-014-005  09/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-002           6,054                  12/03/07   12/12/07    Bette & Cring, LLC                  
                                                            1-003           2,278                  01/03/08   01/11/08    Bette & Cring                       
                                                            1-006             622                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-011           2,797                  01/17/08   01/28/08    BETTE & CRING LLC                   
                                                            1-012          33,912                  05/21/08   08/07/08    BETTE & CRING, LLC.                 
                                                            1-018           2,667                  05/21/08   08/07/08    BETTE & CRING, LLC.                 
                                                            2-002           3,545                  04/14/08   04/18/08    NORTHERN MECHANICAL                 
                                                            2-003          20,033                  11/19/08   01/27/09    NORTHERN MECHANCIAL                 
                                                            2-008           1,067                  01/28/09   04/02/09    NORTHERN MECHANCIALS                
                                                            3-001          21,706          21,706  10/30/07   11/14/07    Empire Northeast                    
                                                            3-005             151                  07/16/08   08/18/08    EMPIRE NORTHEAST                    
                                                            4-002           4,754                  01/17/08   01/28/08    S&L ELECTRIC                        
                                                            4-005           9,575                  02/21/08   03/07/08    S & L ELECTRIC                      
                                                            4-007           9,700                  03/31/08   04/07/08    S&L ELECTRIC                        
                                                            4-01           38,127                  02/28/08   10/21/08    PTL CONTRACTING                     
                                                            4-012           9,497                  03/31/08   04/07/08    S&L ELECTRIC, INC.                  
                                                            4-013           7,087                  07/16/08   08/18/08    S & L ELECTRIC, INC.                
                                                            4-02           10,421                  02/28/08   04/14/09    NORTHWEST TECH                      
                                                            5-002          33,413                  01/17/08   01/28/08    DANKO CONSTRUCTION CORP             
 
06-0218   Reconstruction               0-014-006  02/01/07  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0978   Reconstruction               0-014-007  06/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E2              2,100                  03/27/17   04/12/17    TEL, Inc.                           
                                                            P1                402                  03/27/17   04/12/17    Hyde-Stone Mechanical Contractors   
                                                            P2             -2,763                  03/27/17   04/12/17    Hyde-Stone Mechanical Contractors   
 
19-0579   Reconstruction               0-014-008  02/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          27,126                  01/28/22   11/08/22    Collins-Hammond Elec                
                                                            EC-02          19,316                  01/28/22   11/08/22    Collins-Hammond Elec                
                                                            EC-03          22,059                  01/28/22   11/08/22    Collins-Hammond Elec                
                                                            EC-04           4,905                  05/06/22   03/13/23    Collins-Hammond Elec                
                                                            FSE-01         14,428                  02/14/22   02/16/23    Joseph Flihan Co                    
                                                            GC-01         -42,085                  05/06/22     /  /      Bette&Cring                         
                                                            MC-02        -162,058                  05/06/22   03/13/23    Lawman Heat&Cooling                 
                                                            PC-02          22,786                  07/29/21     /  /      NORWOOD PLUMBING                    
                                                            PC-03          32,520                  07/29/21   03/29/22    NORWOOD PLUMBING                    
                                                            PC-06           2,982                  02/14/22   02/13/23    Norwood Plub                        
                                                            PC-07           8,672                  02/14/22   02/13/23    Norwood Plumb                       
                                                            PC-09           1,330                  05/06/22   03/13/23    Norwood Plumb                       
                                                            RC-03          -5,511                  05/06/22   05/22/23    PTL Contrg Corp                     
                                                            SC-02          25,090                  05/06/22   05/22/23    TJ Fiacco Const                     
 
20-0862   Reconstruction               0-014-009  03/02/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Northwest Tech Child Care Demolition:
92-0173   Additions and Alterations    0-018-002  09/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0198   Reconstruction               0-018-003  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0580   Reconstruction               0-018-004  02/28/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Seaway Adult Education Demolition:
92-0964   Additions and Alterations    0-019-002  05/21/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0199   Reconstruction               0-019-003  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0581   Reconstruction               0-019-004  02/28/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          SW Tech Ctr. Nursing Facility:
92-0987   New Construction             0-024-001  05/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0200   Reconstruction               0-024-003  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Potsdam Portable 1:
94-0272   New Construction             0-027-001  10/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Potsdam Portable 2:
94-0273   New Construction             0-028-001  10/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Governeor Tech Building:
96-0860   New Construction             0-029-001  05/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          SW Tech Ctr.- Alt. Education:
98-1188   New Construction             0-033-001  06/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0201   Reconstruction               0-033-002  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Washington Ed. Ctr.(was 004):
99-1426   New Construction             0-034-001  05/16/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              27,056                  02/04/02     /  /      E.D. Young                          
                                                            2              11,196                  02/04/02     /  /      E.D. Young                          
 
01-0192   Reconstruction               0-034-002  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0018   Reconstruction               0-034-003  07/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -1,612                  06/30/06   08/05/08    Sands Brothers Roofing Co., Inc     
 

          Educational Services Center:
10-0619   New Construction             0-046-001  04/28/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-02             604                  08/09/12   11/21/12    Black River Plumbing, Heating & A/C,
                                                            EC-1              796                  04/11/12   10/05/12    BLACK RIVER PLUMBING HEATING & A/C  
                                                            GC-1            4,444                  12/16/11   04/05/12    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            GC-2           95,614                  12/16/11   04/05/12    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            GC-3            1,669                  03/02/12   11/28/12    Harvey Excavation & Construction Co.
                                                            GC-4            9,908                  03/02/12   11/28/12    Harvey Excavation & Construction Co.
                                                            GC-5            6,975                  04/11/12   08/28/12    HARVEY EXCAVATION & CONSTRUCTION CO 
                                                            GC-6            6,225                  08/09/12   11/28/12    Harvey Excavation & Construction Co.
                                                            GC-7            5,499                  12/14/12   03/11/13    Harvey Excavation & Construction Co.
                                                            GC-8            8,855                  12/14/12   03/11/13    Harvey Excavation & Construction Co.
                                                            GC-9            4,276                  10/29/13   11/18/13    Harvey Excavation & Construction Co.
                                                            MC-1              992                  04/11/12   10/05/12    BLACK RIVER PLUMBING HEATIN & A/C   
                                                            MC-2           -1,915                  12/14/12   07/15/13    Black River Plumbing, Heating & A/C,
                                                            PC-1            6,997                  04/11/12   10/05/12    NORWOOD PLUMBING INC                
                                                            PC-2           11,730                  08/09/12   08/02/13    Norwood Plumbing, Inc.              
                                                            PC-3           20,133                  08/09/12   08/02/13    Noorwood Plumbing, Inc.             
                                                            PC-4            2,249                  12/14/12   08/12/13    Norwood Plumbing, Inc.              
                                                            RC-1           -8,397                  03/02/12   11/28/12    Gouverneur Roofing Siding & Sheet Me
                                                            Site - 1          614                  03/02/12   11/28/12    T. J. Fiacco Construction, LLC      
 
12-0913   Reconstruction               0-046-002  09/13/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Office:
90-1056   Reconstruction               1-001-001  04/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0813   Reconstruction               1-001-002  03/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0567   Reconstruction               1-001-003  12/26/97  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0324   Reconstruction               1-001-004  04/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,854                  10/29/13   12/06/13    Bette & Cring                       
 

          Canton Administrative Office:
01-0202   Reconstruction               1-017-002  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Storage Trailer - Central Office:
94-0585   New Construction             2-026-001  01/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Learning Resource Ctr Demolition:
90-1057   Reconstruction               7-008-001  04/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0203   Reconstruction               7-008-002  01/31/03  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0582   Reconstruction               7-008-003  02/28/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pinewood Center:
90-1058   Reconstruction               8-007-001  04/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE