Change Order Status - Schoharie


COBLESKILL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-04-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Aker Elementary School:
91-0999   Reconstruction               0-001-002  04/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          George D. Ryder School:
91-1000   Reconstruction               0-002-005  04/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          William H. Golding Jr. High:
91-1001   Reconstruction               0-003-006  04/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Shelter Bldg. Annex:
91-1002   Reconstruction               0-004-002  04/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE

GILBOA CONESVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-08-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
92-0522   Additions and Alterations    0-001-003  02/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1562   Reconstruction               0-001-004  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1079   Additions and Alterations    0-001-005  07/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1                0                  03/13/03   03/24/03    Avala Contracting                   
                                                            EC-1             -706                  01/16/03   02/12/03    Harold R. Clune                     
                                                            GC-1            6,643                  10/24/02   11/07/02    Simmons Masonry                     
                                                            GC-2           11,346                  01/16/03   02/12/03    Simmons Masonry                     
                                                            GC-3            4,216                  03/03/03   03/26/03    Simmons Masonry                     
                                                            GC-4           17,989                  03/20/03   03/24/03    Simmons Masonry                     
                                                            GC-5            4,250                  04/01/03   04/21/03    Simmons Masonry                     
                                                            GC-6            6,692                  05/27/03   06/03/03    Simmons Masonry                     
                                                            HVAC-1         -9,261                  03/19/03   03/24/03    DiGesare Mech.                      
                                                            MC-1             -630                  03/13/03   03/24/03    Colonie Masonry                     
                                                            PC-1           -5,000                  07/29/03   08/01/03    Collett Mech.                       
                                                            RC-1              985                  03/13/03   03/24/03    Apple Roofing                       
                                                            SR-1            1,000                  04/10/03   04/21/03    Brown Sound Equip.                  
                                                            SW-1           16,124                  10/04/02   11/06/02    TC Briggs Contracting and Supply    
                                                            SW-2           11,032                  10/04/02   11/06/02    TC Briggs                           
                                                            SW-3           13,222                  01/08/03   02/12/03    TC Briggs                           
                                                            SW-4            1,253                  01/16/03   02/12/03    TC Briggs                           
                                                            SW-5            3,091                  03/03/03   03/26/03    TC Briggs                           
                                                            SW-6           10,153                  01/28/04   03/08/04    TC Briggs Contracting and Supply    
 
02-1713   Reconstruction               0-001-006  04/14/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1          -15,000                  10/30/03   11/12/03    Apple Roofing                       
 
05-0190   Reconstruction               0-001-007  09/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ST-1            6,032                  04/18/06   06/30/06    Orchard Earth Pipe Corp             
 
09-1131   Reconstruction               0-001-008  07/22/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0901   Reconstruction               0-001-009  03/29/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-1           -9,058                  04/15/13   07/02/13    MERIT PLUMBING & HEATING LLC        
 
15-0317   Reconstruction               0-001-010  08/28/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0518   Reconstruction               0-001-011  08/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1          -11,150                  07/03/20   08/11/20    KASSELMAN ELECTRIC CO.,INC.         
                                                            GC-1            4,248                  06/19/19   06/20/19    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-2            8,562                  01/31/20   06/05/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-3           -4,611                  01/31/20   06/05/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-4            6,572                  01/31/20   06/05/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-5            2,891                  07/03/20   08/12/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            MC-1           10,856                  07/03/20   08/11/20    STANTS CAPITAL COMBUSTION, LLC      
                                                            MC-2           17,548                  07/03/20   08/11/20    STANTS CAPITAL COMBUSTION, LLC      
                                                            PC-1            6,740                  07/17/20   08/26/20    STANTS CAPITAL COMBUSTION, LLC      
                                                            SC-1           -3,238                  07/17/20   09/10/20    BAST HATFIELD CONSTRUCTION, LLC     
 
21-0015   Reconstruction               0-001-012  10/05/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building:
95-0746   New Construction             2-009-001  03/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Demolition:
17-0519   Reconstruction               5-007-002  08/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1           13,390                  05/13/19   05/15/19    TITAN ROOFING, INC.                 
                                                            RC-2            7,315                  02/24/20   06/30/20    TITAN ROOFING, INC.                 
                                                            RC-3             -779                  07/17/20   09/10/20    TITAN ROOFING, INC.                 
                                                            RC-4             -994                  07/17/20   09/10/20    TITAN ROOFING, INC.                 
 
20-1955   Reconstruction               5-007-003  08/09/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            5,874                  11/14/22   12/07/23    BAST HATFIELD CONST LLC             
 

          New Bus Garage:
20-1956   New Construction             5-014-001  08/09/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           34,993                  07/24/23   12/27/23    A. TREFFEISEN                       
                                                            EC-2            1,957                  07/24/23   12/27/23    A. TREFFEISEN & SON                 
                                                            GC-2           -4,429                  11/14/22   12/07/23    BAST HATFIELD CONST. INC            
                                                            MC-02          -3,059                  05/01/23   12/27/23    TRI-VALLEY PLUMBING & HEATING       
                                                            MC-1            4,537                  05/01/23   12/27/23    TRI-VALLEY PLUMBING & HEATING       
                                                            gc-3           -1,887                  08/09/23     /  /      BAST HATFEILD CONSTRUCTION          
 

          UV Disinfection Building:
21-0016   New Construction             7-015-001  10/05/21  NO CHANGE ORDERS ON ELECTRONIC FILE

JEFFERSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-09-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Jefferson Central School:
98-1263   Additions and Alterations    0-001-006  07/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0793   Reconstruction               0-001-007  01/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0624   Additions and Alterations    0-001-008  03/25/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01         -89,750                  11/02/09   03/12/10    HMA CONTRACTING CORPORATION         
                                                            01-02           3,072                  04/22/10   07/28/10    HMA CONTRACTING CORPORATION         
                                                            01-03           5,840                  10/01/10   11/01/10    HMA CONTRACTING CORPORATION         
                                                            01-04           5,520                  10/01/10   06/29/12    HMA CONTRACTING CORPORATION         
                                                            01-05          29,100                  10/01/10   11/01/10    HMA CONTRACTING CORPORATION         
                                                            01-06          19,950                  11/10/10   12/01/10    HMA CONTRACTING CORPORATION         
                                                            01-07           2,098                  01/31/11   03/03/11    HMA CONTRACTING CORPORATION         
                                                            01-08           7,455                  04/01/11   04/21/11    HMA CONTRACTING CORPORATION         
                                                            01-09          -1,620                  01/24/12   04/27/12    HMA CONTRACTING CORPORATION         
                                                            02-01          34,000                  03/29/10   05/28/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-02         -19,003                  11/02/09   03/12/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-03         -21,250                  11/02/09   03/12/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-04          -5,700                  11/02/09   03/12/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-05          -7,210                  11/02/09   03/12/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-056          4,000                  09/30/11   11/18/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-06          -9,070                  11/02/09   03/12/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-07         -15,594                  11/02/09   03/12/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-08         -35,145                  04/15/10   06/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-09          -3,440                  04/15/10   06/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-10         -37,550                  04/15/10   06/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-11         -28,791                  02/03/10   04/15/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-12         -13,850                  04/22/10   07/28/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-13          -8,400                  03/03/10   04/30/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-14         -54,902                  04/22/10   07/28/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-15         -12,175                  03/03/10   04/30/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-16          -4,586                  04/22/10   07/28/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-17          -1,207                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-18          -2,950                  07/13/10   11/17/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-19          -6,052                  07/13/10   11/17/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-20         -19,459                  07/13/10   11/17/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-21          -3,500                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-22            -460                  09/02/10   09/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-23            -404                  09/02/10   09/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-24          66,277                  09/02/10   09/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-25         -30,125                  09/02/10   09/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-26          -7,000                  09/02/10   09/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-27           3,078                  09/02/10   09/24/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-28           1,356                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-29             536                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-30             628                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-31            -218                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-32           2,650                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-33           2,404                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-34             310                  10/01/10   11/01/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-36           4,214                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-37           7,790                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-38           7,064                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-39           4,635                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-40          -6,384                  05/04/11   05/25/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-41           3,667                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-42           1,150                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-43         -20,970                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-44           6,373                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-45           4,849                  01/31/11   06/29/12    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-46             711                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-47           8,400                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-48             879                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-49           1,318                  03/03/11   03/25/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-50             307                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-51          -8,800                  01/31/11   03/03/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-52           1,200                  04/01/11   04/21/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-53             705                  03/03/11   03/25/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-54           3,127                  05/04/11   05/25/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-55            -441                  05/04/11   05/25/11    LECHASE CONSTRUCTION SERVICES LLC   
                                                            02-57          -3,500                  04/27/12   10/05/12    LECHASE CONSTRUCTION SERVICES LLC   
                                                            03-01         -10,113                  11/02/09   03/12/10    MERIT PLUMBING & HEATING            
                                                            03-02          -3,847                  11/02/09   03/30/10    MERIT PLUMBING & HEATING            
                                                            03-03           1,086                  04/01/11   04/21/11    MERIT PLUMBING & HEATING            
                                                            03-04         -20,000                  05/31/11   07/15/11    MERIT PLUMBING & HEATING            
                                                            04-01          -3,003                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-02          -4,038                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-03          -7,582                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-04          -4,029                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-05          -3,960                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-06          -7,123                  11/02/09   03/30/10    JUSTIN ELECTRICAL INC               
                                                            04-07         -18,560                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-08          -4,598                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-09          -5,369                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-10          -3,911                  11/02/09   03/12/10    JUSTIN ELECTRICAL INC               
                                                            04-11           3,780                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-12             236                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-13             968                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-14           1,866                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-15           1,610                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-16           1,664                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-17           1,130                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-18             833                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-19             644                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-20           1,201                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-21           1,151                  01/31/11   03/03/11    JUSTIN ELECTRICAL INC               
                                                            04-22             975                  04/01/11   04/21/11    JUSTIN ELECTRICAL INC               
                                                            04-23           1,026                  04/01/11   04/21/11    JUSTIN ELECTRICAL INC               
                                                            04-24            -466                  09/06/11   12/22/11    JUSTIN ELECTRICAL INC               
                                                            05-01         -11,368                  11/02/09   03/12/10    JOHN V WARREN INC                   
                                                            05-02         -15,529                  02/03/10   04/15/10    JOHN V WARREN INC                   
                                                            05-03          -4,281                  01/08/10   02/25/10    JOHN V WARREN INC                   
                                                            05-04           2,334                  03/03/11   03/25/11    JOHN V WARREN INC                   
                                                            05-05           6,595                  03/03/11   03/25/11    JOHN V WARREN INC                   
                                                            05-06             359                  03/03/11   03/25/11    JOHN V WARREN INC                   
                                                            05-07             383                  03/03/11   03/25/11    JOHN V WARREN INC                   
                                                            05-08             840                  03/03/11   03/25/11    JOHN V WARREN INC                   
                                                            05-09             752                  03/03/11   03/25/11    JOHN V WARREN INC                   
                                                            05-10           4,300                  07/13/11   08/16/11    JOHN V WARREN INC                   
                                                            05-11           4,620                  07/13/11   08/16/11    JOHN V WARREN INC                   
                                                            06-01         -16,662                  03/03/10   04/30/10    SARATOGA RESTAURANT EQUIPMENT SALES 
                                                            06-02            -619                  04/22/10   07/28/10    SARATOGA RESTAURANT EQUIPMENT SALES 
                                                            06-03          -2,645                  05/04/11   05/25/11    SARATOGA RESTAURANT EQUIPMENT SALES 
                                                            07-01          -8,800                  09/02/10   09/24/10    SYRACUSE SCENERY & STAGE LIGHTING CO
                                                            07-02          -5,010                  04/19/13   07/16/13    SYRACUSE SCENERY & STAGE LIGHTING CO
 
08-1196   Reconstruction               0-001-009  02/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0632   Reconstruction               0-001-012  01/27/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2199FP Reconstruction               0-001-FP1  08/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0336SC Visual Structural Inspection 0-001-SC1  12/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE

MIDDLEBURGH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-10-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
94-1431   Reconstruction               0-001-004  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0427   Reconstruction               0-001-006  11/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0654   Additions and Alterations    0-001-007  03/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -42,240                  03/08/03   03/24/03    ConMas                              
                                                            1              17,150                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            1                   0                  06/04/03   07/11/03    Buffalo Hotel Supply                
                                                            1               1,556                  06/19/03   07/11/03    Gen. Mech. Systems                  
                                                            1                 684                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            1             -31,000                  08/20/03   08/27/03    Facilities Equip.                   
                                                            1(C4-22)        3,160                  04/09/03   04/21/03    Schen. Hardware & Elec.             
                                                            10             80,054                  06/04/03     /  /      Gen. Mech. Systems                  
                                                            10                530                  06/19/03   07/11/03    ConMas                              
                                                            10             -1,287                  05/12/04   05/14/04    DiGesare Mech.                      
                                                            10(C4-6         9,507                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            11              1,069                  06/04/03   07/11/03    Schen. Hardware & Elec.             
                                                            11              3,250                  06/19/03   07/11/03    ConMas                              
                                                            11                864                  01/22/04   01/30/04    Gen. Mech. Systems                  
                                                            11              6,446                  05/12/04   05/14/04    DiGesare Mech.                      
                                                            12              6,258                  06/04/03   07/11/03    Schen. Hardware & Elec.             
                                                            12              2,935                  06/19/03   07/11/03    ConMas                              
                                                            12             22,659                  02/11/04   04/07/04    ConMas                              
                                                            12               -726                  05/12/04   05/14/04    DiGesare Mech.                      
                                                            13                850                  06/19/03   07/11/03    ConMas                              
                                                            13              2,394                  12/26/03   12/31/03    Gen. Mech. Systems                  
                                                            13              3,962                  05/12/04   05/14/04    DiGesare Mech.                      
                                                            13(C4-25        7,997                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            14                395                  06/19/03   07/11/03    ConMas                              
                                                            14            -10,000                  12/26/03   12/31/03    Gen. Mech. Systems                  
                                                            14             -3,000                  06/10/04   06/22/04    DiGesare Mech.                      
                                                            14(C4-27          -19                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            15              5,350                  06/19/03   07/11/03    ConMas                              
                                                            15                556                  01/22/04   01/30/04    Gen. Mech. Systems                  
                                                            15               -400                  06/28/04   07/27/04    DiGesare Mech.                      
                                                            15(C4-28        3,702                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            16              3,350                  06/04/03   07/11/03    Schen. Hardware & Elec.             
                                                            16              1,380                  06/19/03   07/11/03    ConMas                              
                                                            16              3,058                  11/02/04   12/23/04    Gen. Mech. Systems                  
                                                            17              2,690                  06/19/03   07/11/03    ConMas                              
                                                            17(C4-39        2,316                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            18            -19,571                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            18                250                  06/19/03   07/11/03    ConMas                              
                                                            19                445                  06/19/03   07/11/03    ConMas                              
                                                            19             -1,260                  12/10/03   12/06/05    Schen. Hardware & Elec.             
                                                            2                 875                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            2                 630                  06/19/03   07/11/03    Gen. Mech. Systems                  
                                                            2               3,750                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            2              -5,700                  08/20/03   08/27/03    Facilities Equip.                   
                                                            2(C4-24)         -304                  04/09/03   04/21/03    Schen. Hardware & Elec.             
                                                            20                335                  06/19/03   07/11/03    ConMas                              
                                                            20                433                  05/28/04   06/09/04    Schen. Hardware & Elec.             
                                                            21              1,135                  06/19/03   07/11/03    ConMas                              
                                                            21              2,114                  05/28/04   06/09/04    Schen. Hardware & Elec.             
                                                            22                874                  06/19/03   07/11/03    ConMas                              
                                                            22             20,000                  05/28/04   06/09/04    Schen. Hardware & Elec.             
                                                            23                316                  06/19/03   07/11/03    ConMas                              
                                                            23              3,184                  05/28/04   06/09/04    Schen. Hardware & Elec.             
                                                            24              1,967                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            25              4,632                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            26              2,974                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            27              2,801                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            28              5,697                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            29              1,135                  12/10/03   12/26/03    ConMas                              
                                                            29              6,013                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            3               3,875                  03/08/03   03/24/03    ConMas                              
                                                            3               2,495                  04/21/03   05/27/03    DiGesare Mech.                      
                                                            3              -2,841                  06/19/03   07/11/03    Gen. Mech. Systems                  
                                                            3             -13,980                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            3               2,250                  08/20/03   08/27/03    Facilities Equip.                   
                                                            3(C4-29)        9,820                  04/09/03   04/21/03    Schen. Hardware & Elec.             
                                                            30             58,465                  01/22/04   03/08/04    ConMas                              
                                                            30                416                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            31              2,864                  01/22/04   03/08/04    ConMas                              
                                                            31              1,094                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            32                999                  01/22/04   03/08/04    ConMas                              
                                                            32              6,105                  06/28/04   07/27/04    Schen. Hardware & Elec.             
                                                            33             17,830                  01/22/04   03/08/04    ConMas                              
                                                            34                994                  01/22/04   03/08/04    ConMas                              
                                                            35              5,425                  01/22/04   03/08/04    ConMas                              
                                                            36              1,307                  01/22/04   03/08/04    ConMas                              
                                                            37              7,425                  02/11/04   04/07/04    ConMas                              
                                                            38                613                  02/11/04   04/07/04    ConMas                              
                                                            39              2,698                  02/11/04   04/07/04    ConMas                              
                                                            4              -8,538                  03/08/03   03/24/03    ConMas                              
                                                            4                 723                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            4               1,577                  06/19/03   07/11/03    Gen. Mech. Systems                  
                                                            4               1,125                  08/20/03   08/27/03    Facilities Equip.                   
                                                            4(C4-31)        4,318                  04/09/03   04/21/03    Schen. Hardware & Elec.             
                                                            40              1,044                  02/11/04   04/07/04    ConMas                              
                                                            41              4,840                  02/11/04   04/07/04    ConMas                              
                                                            42              6,665                  02/11/04   04/07/04    ConMas                              
                                                            43                840                  02/11/04   04/07/04    ConMas                              
                                                            44                828                  02/11/04   04/07/04    ConMas                              
                                                            45              1,990                  02/11/04   04/07/04    ConMas                              
                                                            46                490                  02/11/04   04/07/04    ConMas                              
                                                            47                290                  02/11/04   04/07/04    ConMas                              
                                                            48                705                  02/11/04   04/07/04    ConMas                              
                                                            49              8,715                  02/11/04   04/07/04    ConMas                              
                                                            5              28,000                  03/08/03   03/24/03    ConMas                              
                                                            5               1,370                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            5               6,297                  06/19/03   07/11/03    Gen. Mech. Systems                  
                                                            5              11,627                  08/20/03   08/27/03    Facilities Equip.                   
                                                            5(C4-34)       27,080                  04/09/03   04/21/03    Schen. Hardware & Elec.             
                                                            50                110                  02/11/04   04/07/04    ConMas                              
                                                            51              8,725                  02/11/04   04/07/04    ConMas                              
                                                            52                  0                  02/11/04   04/07/04    ConMas                              
                                                            53             -1,135                  02/11/04   04/07/04    ConMas                              
                                                            6               3,163                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            6              46,260                  04/21/03   05/27/03    ConMas                              
                                                            6              23,404                  04/21/03   05/27/03    Gen. Mech. Systems                  
                                                            6(C4-41)          279                  04/09/03   04/21/03    Schen. Hardware & Elec.             
                                                            7               3,000                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            7                 912                  04/21/03   05/05/03    ConMas                              
                                                            7               1,011                  04/21/03   05/05/03    Gen. Mech. Systems                  
                                                            7                 613                  06/04/03   07/11/03    Schen. Hardware & Elec.             
                                                            8               2,182                  04/21/03   05/05/03    Gen. Mech. Systems                  
                                                            8               3,751                  06/04/03   07/11/03    ConMas                              
                                                            8               1,920                  06/19/03   07/11/03    DiGesare Mech.                      
                                                            9               1,250                  04/21/03   05/05/03    Gen. Mech. Systems                  
                                                            9                 335                  06/19/03   07/11/03    ConMas                              
                                                            9                 598                  06/19/03   07/11/03    DiGesare Mech.                      
                                                            9(C4-10)          855                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            C2-4            7,837                  03/08/03     /  /      ConMas                              
                                                            C8-1           -3,960                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-10          11,725                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-11           1,250                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-11           7,800                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-12          15,600                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-12          17,430                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-13             560                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-14           6,050                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-15           5,400                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-16           5,976                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-16           3,024                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-17             750                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-18         -28,800                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-19          -3,897                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-2          -19,350                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-20           1,650                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-21          -7,700                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-22          -2,869                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-3           -4,200                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-4           -2,340                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-5           -7,430                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-6           34,000                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-7           19,350                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-8           17,750                  12/18/03   12/26/03    Enviro Techniques                   
                                                            C8-9            6,000                  12/18/03   12/26/03    Enviro Techniques                   
                                                            FT-1            9,430                  01/17/02   03/21/02    Albany Specialties                  
                                                            GC-32             445                  12/10/03   12/26/03    ConMas                              
                                                            GC-65          -9,960                  12/10/03   12/26/03    ConMas                              
                                                            GC-66a          6,358                  12/10/03   12/26/03    ConMas                              
                                                            GC-66b          7,000                  12/10/03   12/26/03    ConMas                              
                                                            GC-67           4,844                  12/10/03   12/26/03    ConMas                              
 
00-0653   Reconstruction               0-001-008  03/13/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,094                  06/04/03   07/11/03    Kuitems Const.                      
 
07-0896   Additions and Alterations    0-001-010  03/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-01         -5,000                  03/25/10   05/24/10    BOJAN DEVELOPMENTS LLC              
                                                            ASB-02           -640                  01/06/12   05/17/12    BOJAN DEVELOPMENT LLC               
                                                            CABLING1          121                  06/18/10   08/05/10    COMALLI TECHNOLOGY SYSTEMS          
                                                            EC-01            -803                  01/06/12   04/24/12    PHOENIX ELECTRICIANS CO             
                                                            GC-01             611                  01/25/11   02/28/11    VMJR COMPANIES LLC                  
                                                            GC-02          62,919                  10/19/11   12/12/11    VMJR COMPANIES LLC                  
                                                            HVAC-01         2,810                  11/03/10   11/16/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            HVAC-02         5,904                  11/03/10   11/16/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            PC-01           1,382                  06/18/10   08/05/10    GENERAL MECHANICAL SYSTEMS INC      
 
12-0081   Reconstruction               0-001-011  08/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0071   Reconstruction               0-001-012  08/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           9,571                  10/07/15   11/18/15    Hoosick Valley Contractors, Inc.    
 
16-1743   Reconstruction               0-001-013  05/11/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1692   Reconstruction               0-001-014  05/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1736   Reconstruction               0-001-015  05/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01             164                  03/21/19   04/25/19    TITAN ROOFING INC.                  
 
18-0893   Reconstruction               0-001-016  01/11/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0676   Reconstruction               0-001-017  02/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          4,922                  12/23/21   10/06/22    Kasselman Elec                      
                                                            EC-004         15,528                  04/19/22   04/17/23    Kasselman Elec                      
                                                            GC-001         10,290                  10/28/20   01/22/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-002          4,048                  10/28/20   01/22/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-003          4,048                  10/28/20   01/22/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-004          4,048                  10/28/20   01/22/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-005          7,711                  10/28/20   01/22/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-006          9,729                  10/13/20   12/30/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-007          3,218                  11/05/20   01/27/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-008            525                  11/05/20   01/27/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-009          3,994                  11/05/20   01/27/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-010         11,582                  12/11/20   02/25/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-011          8,570                  02/02/21   03/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-012          1,760                  02/02/21   03/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-013          9,679                  02/02/21   03/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-014          5,601                  02/02/21   03/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-015          9,408                  06/03/21   01/13/22    Bast Hatfield Construction LLC      
                                                            GC-016          3,472                  04/19/21   05/18/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-017          5,660                  06/23/21   03/14/22    Bast Hatfield Construction LLC      
                                                            GC-020         14,397                  09/24/21   06/16/22    Bast Hatfield Construction, LLC     
                                                            GC-024          2,227                  11/08/21   12/07/22    Bast Hatfield Const, LLC            
                                                            GC-027         17,383                  11/08/21   12/07/22    Bast hatfield Const, LLC            
                                                            GC-031          1,072                  12/23/21   12/27/22    Bast Hatfield Const LLC             
                                                            GC-033          3,798                  02/02/22   02/06/23    Bast Hatfield Const LLC             
                                                            GC-034          3,320                  04/19/22   05/02/23    Bast Hatfield Const LLC             
                                                            MC-001         28,840                  04/19/21   07/29/21    TRANE U.S., INC.                    
                                                            MC-002          7,900                  12/08/21   12/16/22    Trane US Inc                        
                                                            MC-05          11,521                  02/02/22   02/08/23    Trane US Inc                        
                                                            PC-001          3,791                  02/18/21   04/09/21    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-06            -105                  02/16/22   02/14/23    Tri-Valley Plumb&Heat Inc           
                                                            RC-001         12,104                  09/28/20   11/27/20    MID-STATE INDUSTRIES, LTD.          
                                                            RC-002         12,950                  11/30/21   12/22/22    Mid-State Industries                
                                                            RC-004          4,865                  01/06/22   12/27/22    Mid-State Industries Ltd            
                                                            SC-001        -25,000                  09/01/21   05/11/22    VMJR COMPANIES, LLC                 
                                                            SC-002          1,481                  09/01/21   05/11/22    VMJR COMPANIES, LLC                 
                                                            WC-001         22,191                  09/24/21   06/16/22    NEP Glass Co. Ltd                   
                                                            WC-002        -21,459                  04/19/22   05/04/23    NEP Glass Co Ltd                    
 
19-1578   Reconstruction               0-001-018  04/30/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1347   Reconstruction               0-001-019  03/05/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1880   Reconstruction               0-001-020  04/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1312EP Energy Project               0-001-E01  06/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary School:
93-1314   Reconstruction               0-007-003  06/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1429   Reconstruction               0-007-004  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0655   Additions and Alterations    0-007-005  03/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,484                  03/08/03   03/24/03    ConMas                              
                                                            1               5,293                  06/04/03   07/11/03    DiGesare Mech.                      
                                                            1              28,878                  06/19/03   07/11/03    Gen. Mech. Systems                  
                                                            1               1,298                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            1(C4-20)        3,877                  04/09/03   04/21/03    Schen. Hardware & Elec.             
                                                            10              1,406                  01/22/04   03/08/04    ConMas                              
                                                            11              3,030                  01/22/04   03/08/04    ConMas                              
                                                            12              6,587                  02/11/04   03/03/04    ConMas                              
                                                            148            11,993                  03/28/02   05/24/02    Hudson Valley Acoustical & Plaster  
                                                            194             2,909                  03/28/02   05/24/02    Schen. Hardware & Elec.             
                                                            2               4,825                  03/08/03   03/24/03    ConMas                              
                                                            2               1,625                  04/22/03   05/05/03    Schen. Hardware & Elec.             
                                                            2              22,435                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            2               2,078                  06/19/03   07/11/03    Gen. Mech. Systems                  
                                                            2               3,337                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            201             1,038                  03/28/02   05/24/02    Schen. Hardware & Elec.             
                                                            207             1,340                  03/28/02   05/24/02    Hudson Valley Acoustical            
                                                            208             1,014                  03/28/02   05/24/02    Hudson Valley Acoustical            
                                                            209            18,500                  03/28/02   05/24/02    Hudson Valley Acoustical            
                                                            212               555                  03/28/02   05/24/02    S&L Roofing                         
                                                            213               385                  03/28/02   05/24/02    S&L Roofing                         
                                                            214             5,990                  03/28/02   05/24/02    Bette & Cring                       
                                                            217               986                  03/28/02   05/24/02    Hudson Valley Acoustical            
                                                            218             1,665                  03/28/02   05/24/02    Hudson Valley Acoustical            
                                                            220               991                  03/28/02   05/24/02    Hudson Valley Acoustical            
                                                            221               681                  03/28/02   05/24/02    Hudson Valley Acoustical            
                                                            223               394                  03/28/02   05/24/02    Crisafulli Bros.                    
                                                            224               556                  03/28/02   05/24/02    Crisafulli Bros.                    
                                                            233                97                  03/28/02   05/24/02    S&L Roofing                         
                                                            3                 416                  03/08/03   03/24/03    ConMas                              
                                                            3               3,224                  06/04/03   07/11/03    DiGesare Mech.                      
                                                            3               7,383                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            4               5,909                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            4               1,474                  06/04/03   07/11/03    Schen. Hardware & Elec.             
                                                            4               3,483                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            5               2,965                  04/21/03   05/05/03    ConMas                              
                                                            5               1,136                  08/01/03   08/15/03    Universal Custom Millwork           
                                                            5(C4-26)          358                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            6               3,311                  04/21/03   05/05/03    ConMas                              
                                                            6               2,960                  12/10/03   12/26/03    Universal Custom Millwork           
                                                            6(C4-33)      -12,347                  04/07/03   04/21/03    Schen. Hardware & Elec.             
                                                            7                 535                  06/19/03   07/11/03    ConMas                              
                                                            7               1,530                  08/01/03   08/15/03    Schen. Hardware & Elec.             
                                                            8               1,836                  04/22/03   05/05/03    Schen. Hardware & Elec.             
                                                            8               1,087                  06/19/03   07/11/03    ConMas                              
                                                            9               2,045                  06/19/03   07/11/03    ConMas                              
                                                            GC4            -8,538                  03/08/03   03/24/03    ConMas                              
 
00-1873   Reconstruction               0-007-006  02/22/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               4,282                  04/07/03     /  /      Schenectady Hardware and Electric   
 
07-0897   Reconstruction               0-007-007  03/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0082   Reconstruction               0-007-008  08/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1584   Reconstruction               0-007-009  06/10/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           7,958                  11/14/16   11/22/16    Hoosick Valley Contractors, Inc.    
                                                            GC-02          11,992                  02/17/17   02/24/17    Hoosick Valley Contractors, Inc.    
 
19-0677   Reconstruction               0-007-010  02/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          9,812                  09/24/21   11/30/22    Kasselman Electric                  
                                                            EC-003         24,986                  12/23/21   10/06/22    Kasselman Elec                      
                                                            EC-005          8,957                  04/19/22   04/17/23    Kasselman Elec                      
                                                            EC-006          3,090                  06/29/22   05/09/23    Kasselman Elec                      
                                                            GC-018          6,033                  09/24/21   06/16/22    Bast Hatfield Construction, LLC     
                                                            GC-019         27,055                  09/24/21   06/16/22    Bast Hatfield Construction, LLC     
                                                            GC-021         39,349                  09/24/21   06/16/22    Bast Hatfield Construction, LLC     
                                                            GC-022          7,187                  10/14/21   12/06/22    Bast Hatfield Const, LLC            
                                                            GC-023          2,625                  11/08/21   12/07/22    Bast hatfield Const, LLC            
                                                            GC-025         23,823                  11/08/21   12/07/22    Bast Hatfield Const, LLC            
                                                            GC-026         28,275                  11/08/21   12/07/22    Bast Hatfield Const, LLC            
                                                            GC-029          5,084                  12/23/21   12/27/22    Bast Hatfield Const LLC             
                                                            GC-030          4,945                  12/23/21   12/27/22    Bast hatfield Const LLC             
                                                            GC-032            950                  12/23/21   12/27/22    Bast Hatfield Const LLC             
                                                            GC-28          26,687                  12/14/21   01/09/23    Bast Hatfield Const LLC             
                                                            MC-003          8,909                  12/08/21   12/16/22    Trane US Inc                        
                                                            MC-006          7,177                  02/02/22   02/08/23    Trane US Inc                        
                                                            MC-04          18,331                  02/02/22   02/08/23    Trane US Inc                        
                                                            PC-002            789                  11/08/21   12/12/22    Tri-Valley Plumbing&Heating, Inc    
                                                            PC-003            938                  11/12/21   12/12/22    Tri-Valley Plumb&heat Inc           
                                                            PC-004          7,710                  12/08/21   12/16/22    Tri-Valley Plumb&Heat Inc           
                                                            PC-005          4,383                  12/23/21   10/06/22    Tri-Valley plumb&Heat Inc           
                                                            RC-003            875                  01/06/22   12/27/22    Mid-State Industries Ltd            
                                                            SC-003        -77,345                  09/01/21   05/11/22    VMJR COMPANIES, LLC                 
 
21-0113   Reconstruction               0-007-011  09/07/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -94,000                  02/16/22   02/16/23    Bast Hatfield Const LLC             
 
93-1313EP Energy Project               0-007-E01  06/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBus Garage (see 2-002):
92-1589   Reconstruction               5-002-002  07/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1430   Reconstruction               5-002-003  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Middleburgh Bus Garage:
00-0457   New Construction             5-009-001  03/13/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,413                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            1               3,478                  06/19/03   07/11/03    Schenectady Hardware & Elec.        
                                                            2                 924                  03/08/03   03/24/03    ConMas                              
                                                            2                 631                  04/21/03   05/05/03    DiGesare Mech.                      
                                                            2                -920                  06/19/03   07/11/03    Schenectady Hardware & Elec.        
                                                            3                 575                  05/12/04   05/14/04    DiGesare Mech.                      
                                                            C2-14           1,687                  03/08/03   03/24/03    ConMas                              
 
12-0083   Reconstruction               5-009-002  08/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
19-1579   Reconstruction               7-999-001  05/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

COBLESKILL-RICHMONDVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-11-02-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXWm D Aker School-SOLD-IN 2001:
94-0799   Reconstruction               0-001-002  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          George D. Ryder School:
93-1625   Reconstruction               0-002-001  08/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0800   Reconstruction               0-002-002  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0764   Reconstruction               0-002-003  02/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1288   Reconstruction               0-002-004  06/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0563   Reconstruction               0-002-005  03/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0438   Additions and Alterations    0-002-006  06/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00001           2,520                  12/27/06   01/23/07    Peter Luizzi Brothers Contracting   
                                                            001            -1,968                  07/25/03   07/29/03    T. Lemme Mech.                      
                                                            001          -187,288                  07/25/03   07/29/03    Gross Elec.                         
                                                            001            -1,864                  07/25/03   07/29/03    Hudson Valley Communications        
                                                            002              -677                  07/25/03   07/29/03    Crisafulli Bros.                    
                                                            002             1,048                  09/05/03   09/16/03    Hudson Valley Communications        
                                                            002             2,532                  07/26/04   08/02/04    Northeast Information System        
                                                            003            -8,785                  07/25/03   07/29/03    Welliver McGuire                    
                                                            004           -38,017                  07/25/03   07/29/03    Welliver McGuire                    
                                                            004               909                  07/25/03   07/29/03    Gross Elec.                         
                                                            004            30,790                  09/05/03   09/16/03    T. Lemme Mech.                      
                                                            005             7,630                  10/24/03   11/04/03    T. Lemme Mech.                      
                                                            005             1,726                  10/24/03   11/04/03    Hudson Valley Communications        
                                                            005             3,043                  01/11/05   06/29/05    Northeast Information systems       
                                                            006               620                  07/25/03   07/29/03    Crisafulli Bros.                    
                                                            006            11,558                  10/24/03   11/04/03    Gross Elec.                         
                                                            006               166                  12/12/03   01/06/04    Hudson Valley Communications        
                                                            008            13,610                  03/08/04   04/30/04    T. Lemme Mech.                      
                                                            008             1,449                  03/08/04   04/30/04    Hudson Valley Communications        
                                                            009              -909                  09/05/03   09/16/03    Welliver McGuire                    
                                                            009             3,775                  03/25/04   04/30/04    Hudson Valley Communication         
                                                            009             2,671                  07/26/04   08/13/04    Gross Elec.                         
                                                            010           -17,299                  10/24/03   11/04/03    Welliver McGuire                    
                                                            011             1,172                  07/26/04   08/02/04    Hudson Valley Communications        
                                                            012             3,400                  12/12/03   01/06/04    Crisafulli Bros.                    
                                                            012             3,794                  12/12/03   12/31/03    Welliver McGuire                    
                                                            012             2,160                  06/28/04   07/06/04    T Lemme Mech.                       
                                                            012               932                  07/26/04   08/02/04    Hudson Valley Comunication          
                                                            013               293                  10/18/04   06/21/05    Hudson Valley Communciations        
                                                            013            10,021                  09/15/06   01/19/07    Gross Electric                      
                                                            014             1,360                  12/12/03   12/31/03    Welliver McGuire                    
                                                            015               323                  10/18/04   06/21/05    Hudson Valley Communications        
                                                            015             4,373                  12/06/04   06/23/05    Gross Elec.                         
                                                            016             1,233                  03/25/04   04/30/04    Crisafulli Bros.                    
                                                            016            11,193                  12/06/04   06/23/05    Gross Elec.                         
                                                            017            -1,320                  12/12/03   12/31/03    Welliver McGuire                    
                                                            017             6,453                  01/11/05   06/29/05    Gross Elec.                         
                                                            018               993                  04/11/05   07/25/05    Gross Electric                      
                                                            019            -3,670                  12/12/03   12/31/03    Welliver McGuire                    
                                                            019            12,265                  04/11/05   07/25/05    Gross Electric                      
                                                            020             4,978                  03/25/04   04/06/04    Welliver McGuire                    
                                                            020             2,141                  12/06/04   06/23/05    T. Lemme Mech.                      
                                                            022             3,900                  03/25/04   04/06/04    Welliver McGuire                    
                                                            022            22,141                  01/11/05   04/24/06    T. Lemme Mech.                      
                                                            023             1,151                  12/06/04   12/13/04    T. Lemme Mech.                      
                                                            024           145,200                  03/25/04   04/12/04    Welliver McGuire                    
                                                            025               500                  03/25/04   04/06/04    Welliver McGuire                    
                                                            026             7,882                  04/11/05   07/25/05    T Lemme Mechanical                  
                                                            027            17,664                  04/11/05   04/24/06    T Lemme Mechanical                  
                                                            028               294                  03/25/04   04/30/04    Welliver McGuire                    
                                                            030             2,825                  04/30/04   05/07/04    Welliver McGuire                    
                                                            032            13,000                  04/30/04   05/07/04    Welliver McGuire                    
                                                            033             1,089                  04/30/04   05/07/04    Welliver McGuire                    
                                                            037             1,662                  06/28/04   07/06/04    Welliver McGuire                    
                                                            038             3,743                  08/30/04   09/24/04    Welliver McGuire                    
                                                            039             6,558                  07/26/04   08/02/04    Welliver McGuire                    
                                                            040             1,200                  07/26/04   08/02/04    Welliver McGuire                    
                                                            045             8,772                  08/30/04   09/24/04    Welliver McGuire                    
                                                            048               986                  10/18/04   10/27/04    Welliver McGuire                    
                                                            051             3,813                  10/18/04   10/27/04    Welliver McGuire                    
                                                            053             8,762                  10/18/04   10/27/04    Welliver McGuire                    
                                                            056            12,233                  01/11/05   01/24/05    Welliver McGuire                    
                                                            057               630                  12/06/04   12/13/04    Welliver McGuire                    
                                                            059            -1,151                  12/06/04   06/23/05    Welliver McGuire                    
                                                            063               144                  01/11/05   01/24/05    Welliver McGuire                    
                                                            066            -9,464                  01/11/05   01/24/05    Welliver McGuire                    
                                                            071           -10,786                  04/11/05   04/26/05    Welliver McGuire Inc                
                                                            072            -9,575                  04/11/05   04/26/05    Welliver McGuire                    
                                                            073           -20,017                  04/11/05   04/26/05    Welliver McGuire                    
                                                            076            -4,096                  04/11/05   04/26/05    Welliver McGuire                    
 
03-0985   Reconstruction               0-002-008  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,185                  09/29/04   10/04/04    A Treffeisen & Sons                 
                                                            00001          65,730                  09/29/04   10/04/04    Henderson Johnson                   
                                                            0003           -9,750                  12/18/06   01/30/07    Henderson Johnson                   
 
07-0656   Reconstruction               0-002-009  04/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001           -424                  09/12/08   05/12/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-002            570                  09/12/08   05/12/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-003        -27,500                  09/12/08   05/12/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-006          7,451                  09/12/08   05/12/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-007          1,893                  09/12/08   05/12/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-008            417                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-010          2,097                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-011          7,878                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-012          1,507                  10/17/08   10/30/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-014          2,760                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-018            683                  11/07/08   03/09/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-021A        25,097                  11/07/08   03/09/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-024          5,580                  11/14/08   02/05/09    DUTCH VALLEY GENERAL CONTRACTING 558
                                                            01-026          1,850                  01/12/09   04/03/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-029          5,396                  01/12/09   04/03/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-031            805                  11/12/09   12/29/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-032          1,115                  11/12/09   12/29/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-033          6,429                  11/12/09   12/29/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-22             365                  11/14/08   06/15/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-23             606                  11/14/08   06/15/09    DUTCH VALLEY CONTRACTING            
                                                            02-001          1,074                  11/14/08   02/05/09    T. LEMME MECHANCIAL INC.            
                                                            03-002          8,934                  09/12/08   12/03/08    T. LEMME MECHANICAL, INC.           
                                                            04-003          1,497                  10/17/18   11/26/12    STILSING ELECTRIC                   
                                                            04-005         -3,168                  10/17/08   11/06/08    STILSING ELECTRIC                   
                                                            04-007C         4,219                  10/17/08   10/30/08    STILSING ELECTRIC                   
                                                            04-008          1,401                  10/17/08   10/30/08    STILSING ELECTRIC                   
                                                            04-011         13,834                  11/07/08   03/09/09    STILSING ELECTRIC                   
                                                            04-014          2,362                  01/12/09   04/13/09    STILSING ELECTRIC                   
                                                            1X-001          2,632                  11/30/10   01/07/11    ROSCH BROTHERS INC                  
 
20-1731   Reconstruction               0-002-012  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-05          -4,000                  07/19/23   12/22/23    MONAHAN & LOUGHLIN                  
 
21-0514   Reconstruction               0-002-013  10/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0281FP Reconstruction               0-002-FP1  10/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Golding Middle School(Jr/Sr):
93-1626   Reconstruction               0-003-001  08/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0801   Reconstruction               0-003-002  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1395   Reconstruction               0-003-003  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1289   Reconstruction               0-003-004  06/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0564   Reconstruction               0-003-005  03/14/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            007            13,815                  10/24/03   11/05/03    Crisafulli Bros.                    
 
98-1131   Reconstruction               0-003-006  05/27/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0439   Additions and Alterations    0-003-008  06/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001            12,957                  07/25/03   07/29/03    Aquifer Drilling & Testing          
                                                            001             1,527                  07/25/03   07/29/03    Crisafulli Bros.                    
                                                            001            -8,740                  07/25/03   07/29/03    Joseph Filhan                       
                                                            002             1,038                  07/25/03   07/29/03    Welliver McGuire                    
                                                            002           -72,000                  07/25/03   07/29/03    Gross Elec.                         
                                                            002               490                  07/25/03   07/29/03    Joseph Filhan                       
                                                            002             1,320                  10/24/03   11/04/03    Aquifer Drilling & Testing          
                                                            003              -246                  07/25/03   07/29/03    Crisafulli Bros.                    
                                                            003           -10,962                  07/25/03   07/29/03    T. Lemme Mech.                      
                                                            003               250                  08/30/04   09/23/04    Northeast Information Systems       
                                                            004             1,141                  10/24/03   11/04/03    Hudson Valley Communications        
                                                            004              -250                  12/06/04   06/23/05    Northeast Information Systems       
                                                            005             3,160                  07/25/03   07/29/03    Welliver McGuire                    
                                                            005               446                  07/25/03   07/29/03    Crisafulli Bros.                    
                                                            006           -46,650                  07/25/03   07/29/03    Welliver McGuire                    
                                                            006             1,798                  10/24/03   11/04/03    T. Lemme Mech.                      
                                                            007             1,320                  07/25/03   07/29/03    Welliver McGuire                    
                                                            007            13,815                  09/05/03   09/16/03    Crisafulli Bros.                    
                                                            007            19,860                  10/24/03   11/04/03    Gross Elec.                         
                                                            008             3,573                  07/25/03   07/29/03    Welliver McGuire                    
                                                            008               249                  07/26/04   08/02/04    Gross Elec.                         
                                                            009             3,381                  12/12/03   01/06/04    Crisafulli Bros.                    
                                                            009             2,036                  03/08/04   04/30/04    T. Lemme Mech.                      
                                                            010            12,401                  08/30/04   09/27/04    Gross Elec.                         
                                                            011             2,185                  03/25/04   04/30/04    T. Lemme Mech.                      
                                                            011             2,152                  08/30/04   09/23/04    Gross Elec.                         
                                                            012            18,873                  09/15/06   11/30/06    Gross electric                      
                                                            013               888                  06/28/04   07/06/04    T. Lemme Mech.                      
                                                            014            13,363                  03/25/04   04/30/04    Crisafulli Bros.                    
                                                            014            20,536          20,536  07/26/04   09/27/04    T. Lemme Mech.                      
                                                            014               892                  12/06/04   06/23/05    Gross Elec.                         
                                                            015             5,970                  12/12/03   12/31/03    Welliver McGuire                    
                                                            015             3,500                  03/25/04   04/30/04    Crisafulli Bros.                    
                                                            015             7,336                  07/26/04   09/27/04    T. Lemme Mech.                      
                                                            016             2,070                  08/30/04   09/23/04    T. Lemme Mech.                      
                                                            016             7,438                  10/18/04   06/21/05    Hudson Valley Communications        
                                                            017             7,045                  08/30/04   09/23/04    T. Lemme Mech.                      
                                                            017             1,994                  12/06/04   06/23/05    Hudson Valley Communications        
                                                            018             3,323                  04/30/04   05/07/04    Crisafulli Bros.                    
                                                            018             9,604                  10/18/04   06/21/05    T Lemme Mech.                       
                                                            019             2,448                  10/18/04   06/21/05    T Lemme Mech.                       
                                                            020             9,021                  04/30/04   05/07/04    Crisafulli Bros.                    
                                                            021               403                  03/25/04   04/06/04    Welliver McGuire                    
                                                            021               171                  08/30/04   09/23/04    Crisafulli Bros.                    
                                                            021             6,143                  11/06/04   06/23/05    T. Lemme Mech.                      
                                                            022             8,919                  08/31/04   09/27/04    Crisafulli Bros.                    
                                                            023             2,644                  10/18/04   06/21/05    Crisafulli Bros.                    
                                                            024             1,891                  10/18/04   06/21/05    Crisafulli Bros.                    
                                                            024             1,761                  01/11/05   06/29/05    T. Lemme Mech.                      
                                                            025               963                  01/11/05   06/29/05    Crisafulli Bros.                    
                                                            026             3,036                  03/25/04   04/06/04    Welliver McGuire                    
                                                            027             2,095                  03/25/04   04/12/04    Welliver McGuire                    
                                                            029            36,851                  04/30/04   05/07/04    Welliver McGuire                    
                                                            034             6,219                  04/30/04   05/07/04    Welliver McGuire                    
                                                            036             3,155                  06/28/04   07/06/04    Welliver McGuire                    
                                                            042             3,587                  07/26/04   08/02/04    Welliver McGuire                    
                                                            046             6,887                  08/30/04   09/24/04    Welliver McGuire                    
                                                            049             3,138                  10/18/04   10/27/04    Welliver McGuire                    
                                                            052             3,699                  10/18/04   10/26/04    Welliver McGuire                    
                                                            055            11,242                  12/06/04   12/13/04    Welliver McGuire                    
                                                            058            26,490                  12/06/04   12/13/04    Welliver McGuire                    
                                                            061             1,723                  12/06/04   12/13/04    Welliver McGuire                    
                                                            062            -2,867                  12/06/04   12/13/04    Welliver McGuire                    
                                                            064             6,999                  01/11/05   01/24/05    Welliver McGuire                    
                                                            068             8,573                  01/11/05   01/24/05    Welliver McGuire                    
                                                            069             6,237                  01/11/05   01/24/05    Welliver McGuire                    
                                                            070            14,479                  09/15/06   11/30/06    Welliver MCGuire                    
                                                            074            -3,649                  04/11/05   04/26/05    Welliver McGuire                    
                                                            075           -14,083                  04/11/05   04/26/05    Welliver McGuire                    
                                                            077            -8,376                  04/11/05   05/02/05    Welliver McGuire                    
                                                            079           -26,490                  04/11/05   06/14/05    Welliver McGuire                    
                                                            080            -2,970                  04/11/05   05/02/05    Welliver McGuire                    
 
03-0986   Reconstruction               0-003-009  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          16,685                  10/15/04   10/22/04    Delsignore Paving                   
                                                            00002          19,440                  09/29/04   10/04/04    Henderson Johnson                   
                                                            00002          -3,600                  09/18/06   10/27/06    Delsignore Paving                   
 
07-0657   Reconstruction               0-003-010  04/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            01-004         -2,980                  09/12/08   05/12/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-019            728                  11/07/08   03/09/09    DUTCH VALLEY CONTRACTING            
                                                            01-021B        25,097                  11/07/08   03/09/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-025          4,200                  01/12/09   04/03/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-030            727                  01/12/09   04/03/09    DUTCH VALLEY GENERAL CONTRATING     
                                                            01-034           -897                  11/20/09   02/05/10    DUTCH VALLEY GENERAL CONTRACTING    
                                                            03-001        -13,623                  09/12/08   05/12/09    T. LEMME MECHANICAL, INC.           
                                                            04-001         -3,654                  09/12/08   12/03/08    STILSING ELECTRIC                   
                                                            04-004A         3,613                  10/17/08   11/06/08    STILSING ELECTRIC                   
                                                            04-006            456                  10/17/08   10/30/08    STILLSING ELECTRIC                  
                                                            04-007D         4,219                  10/17/08   10/30/08    STILSING ELECTRIC                   
                                                            04-013            232                  01/12/09   04/13/09    STILSING ELECTRIC                   
                                                            04-015          1,087                  04/08/09   07/29/09    STILSING ELECTRIC                   
 
19-1569   Reconstruction               0-003-013  06/23/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01          -1,534                  12/11/20   02/25/21    R.B. ROBINSON CONTRACTING, INC.     
 
20-1732   Reconstruction               0-003-014  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01        -116,000                  12/02/21   12/16/22    Monahan & Loughlin LLC              
                                                            GC-01        -116,000                  12/20/21   01/13/23    Monahan&Loughlin LLC                
                                                            GC-02           5,499                  01/28/22   02/03/23    Monahan&loughlin LLC                
                                                            GC-02           5,764                  03/29/22   02/13/23    MONAHAN & LOUGHLIN                  
 
21-0515   Reconstruction               0-003-015  10/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXShelter Bldg. Annex-See 0-002Ryder:
93-1627   Reconstruction               0-004-001  08/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0802   Reconstruction               0-004-002  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1393   Reconstruction               0-004-003  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1290   Reconstruction               0-004-004  06/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0565   Reconstruction               0-004-005  03/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Main Building - Radez Elem.:
93-1628   Reconstruction               0-015-001  08/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0803   Reconstruction               0-015-002  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0763   Reconstruction               0-015-003  02/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1394   Reconstruction               0-015-004  04/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1291   Reconstruction               0-015-005  06/11/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            48,521                  07/25/03   08/26/03    Gross Electric                      
 
98-1130   Reconstruction               0-015-006  05/27/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0566   Reconstruction               0-015-007  03/14/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-6             1,375                  01/16/01   01/15/02    Bast Hatfield                       
                                                            4-3             8,113                  01/16/01   01/28/02    Harold Clune                        
 
01-0440   Additions and Alterations    0-015-008  06/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            -7,560                  07/25/03   07/29/03    T. Lemme Mech.                      
                                                            007             2,631                  10/24/03   11/04/03    T. Lemme Mech.                      
                                                            007               174                  03/08/04   04/23/04    Hudson Valley Communications        
                                                            007               174                  04/16/08     /  /      HUDSON VALLEY COMMUNICATIONS        
                                                            010             2,274                  03/08/04   04/30/04    T. Lemme Mech.                      
 
07-0658   Reconstruction               0-015-010  04/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-005          1,824                  09/12/08   05/12/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-013          1,817                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-016          1,126                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-017          4,025                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-028          1,679                  01/12/09   04/03/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            03-004          1,228                  04/08/09   07/29/09    T. LEMME MECHANICAL, INC.           
                                                            04-002          1,918                  10/17/08   10/30/08    STILSING ELECTRIC                   
                                                            04-016         23,620                  08/06/09   07/09/19    STILSING ELECTRIC                   
                                                            2X-001          4,212                  11/30/10   01/07/11    J.A. EDGAR COMPANY INC              
 
12-0172   Reconstruction               0-015-013  04/02/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -3,578                  01/31/13   02/13/14    JUSTIN ELECTRICAL INC               
 
20-1733   Reconstruction               0-015-014  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-03             169                  06/20/23   12/22/23    MONAHAN & LOUGHLIN                  
                                                            GC-03             169                  07/19/23     /  /      MONAHAN & LOUGHLIN                  
                                                            GC-04           2,671                  07/19/23   12/22/23    MONAHAN & LOUGHLIN                  
 
21-0516   Reconstruction               0-015-015  10/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0280FP Reconstruction               0-015-FP1  10/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXHome Economics Bldg.-Demolished:
97-1292   Reconstruction               0-016-001  06/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Radez Auxiliary Building:
97-1293   Reconstruction               0-017-001  06/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
95-0498   New Construction             0-018-001  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0567   Reconstruction               0-018-002  03/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0441   Reconstruction               0-018-003  06/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -1,000                  07/25/03   07/29/03    Welliver McGuire                    
                                                            001             2,622                  07/26/04   08/02/04    Northeast Information Systems       
                                                            001             8,753                  04/16/08     /  /      HUDSON VALLEY COMMUNICATIONS        
                                                            001            -1,000                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            003               666                  10/24/03   11/04/03    Hudson Valley Communications        
                                                            003             1,600                  12/12/03   03/15/04    Joseph Flihan Company               
                                                            003               667                  04/16/08     /  /      HUDSON VALLEY COMMUNICATIONS        
                                                            004            -2,080                  07/25/03   07/29/03    Crisafulli Bros.                    
                                                            005               804                  07/26/04   08/02/04    Gross Elec.                         
                                                            005               804                  04/16/08     /  /      GROSS ELECTRIC, INC.                
                                                            008             4,274                  10/24/03   11/04/03    Crisafulli Bros.                    
                                                            008             1,600                  04/16/08     /  /      JOSEPH FILHAN CO.                   
                                                            010             8,753                  08/30/04   09/27/04    Hudson Valley Communication         
                                                            011             6,720                  10/24/03   12/02/03    Welliver McGuire                    
                                                            011             6,720                  04/16/08   08/05/08    WELLIVER MCGUIRE, INC.              
                                                            013             1,527                  12/12/03   12/31/03    Welliver McGuire                    
                                                            013               767                  03/25/04   04/30/04    Crisafulli Bros.                    
                                                            014             1,729                  10/18/04   06/21/05    Hudson Valley Communications        
                                                            014             1,729                  04/16/08     /  /      HUDSON VALLEY COMMUNICATIONS        
                                                            016             3,885                  12/12/03   12/31/03    Welliver McGuire                    
                                                            016             3,885                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            017             3,780                  04/30/04   05/07/04    Crisafulli Bros.                    
                                                            017            -1,320                  04/16/08   08/05/08    WELLIVER MCGUIRE, INC.              
                                                            018           -15,000                  12/12/03   12/31/03    Welliver McGuire                    
                                                            018           -15,000                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            019               234                  04/30/04   05/07/04    Crisafulli Bros.                    
                                                            023            12,454                  03/25/04   04/06/04    Welliver McGuire                    
                                                            025               945                  04/11/05   04/26/05    T Lemme Mechanical                  
                                                            035             1,652                  07/26/04   08/02/04    Welliver McGuire                    
                                                            035             1,652                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            041             1,272                  07/26/04   08/02/04    Welliver McGuire                    
                                                            041             1,272                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            043             1,966                  08/30/04   09/24/04    Welliver McGuire                    
                                                            044             1,222                  08/30/04   09/24/04    Welliver McGuire                    
                                                            047             2,777                  10/18/04   10/27/04    Welliver McGuire                    
                                                            054             4,499                  10/18/04   10/27/04    Welliver McGuire                    
                                                            065            10,033                  01/11/05   01/24/05    Welliver McGuire                    
                                                            065            10,033                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            067             9,464                  01/11/05   01/24/05    Welliver McGuire                    
                                                            067             9,464                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            078            -1,222                  04/11/05   05/02/05    Welliver McGuire                    
                                                            23            -15,000                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            23             12,454                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            44              1,222                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            47              2,777                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
                                                            54              4,499                  04/16/08     /  /      WELLIVER MCGUIRE, INC.              
 
07-0659   Reconstruction               0-018-005  04/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-009            380                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            01-027          9,417                  01/12/09   04/03/09    DUTCH VALLEY GENERAL CONTRACTING    
                                                            03-003         14,067                  01/12/09   04/13/09    T. LEMME MECHANICAL, INC.           
                                                            04-004B         3,613                  10/17/08   11/06/08    STILLSING ELECTRIC                  
                                                            04-007A         4,219                  10/17/08   10/30/08    STILLSING ELECTRIC                  
                                                            04-007B         4,219                  10/17/08   10/30/08    STILSING ELECTRIC                   
                                                            04-009          3,756                  11/07/08   03/09/09    STILSING ELECTRIC                   
                                                            04-010         -2,767                  11/07/08   03/09/09    STILSING ELECTRIC                   
                                                            04-012          1,366                  11/14/08   02/05/09    STILSING ELECTRIC                   
                                                            04-017            313                  08/06/09   09/16/09    STILSING ELECTRIC                   
 
21-0517   Reconstruction               0-018-008  10/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0282FP Reconstruction               0-018-FP1  10/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          School Bus Garage:
94-0804   Reconstruction               5-006-001  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1294   Reconstruction               5-006-002  06/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0568   Reconstruction               5-006-003  03/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0660   Reconstruction               5-006-006  04/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-015          4,906                  10/17/08   11/06/08    DUTCH VALLEY GENERAL CONTRACTING    
                                                            e1-020          2,450                  11/07/08   03/09/09    DUTCH VALLEY GENERAL CONTRACTING    
 
10-0823   Alterations                  5-006-007  05/24/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage:
99-0569   New Construction             5-019-001  03/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          The Community Library:
06-0328   Reconstruction               6-023-001  11/15/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            # E - 1           575                  03/05/08   03/19/08    Harold R. Clune, Incorp.            
                                                            # E - 3         6,870                  03/05/08   03/19/08    Harold R. Clune, Incorp.            
                                                            # M - 1        -2,076                  03/05/08   03/19/08    Mazone Plumbing and Heating         
                                                            # M - 3         5,240                  03/05/08   03/19/08    Mazone Plumbing and Heating         
                                                            # P - 1         6,583                  03/05/08   03/19/08    John V. Warren, Incorp.             
                                                            #C-4           38,482                  03/05/07   04/18/08    Andrew R. Mancini Associates, Incorp
                                                            1               9,237                  06/27/07   07/17/07    Andrew Mancini Associates           
                                                            C-2             6,000                  12/07/07   01/09/08    Andrew R. Mancini Associates        
                                                            C-3             9,548                  12/07/07   01/09/08    Andrew R. Mancini Associates        
                                                            E-2            34,155                  12/07/07   01/07/08    Harold R. Clune                     
                                                            M-2                -4                  12/10/07   01/07/08    Mazone Plumbing & Heating           
                                                            P-3               403                  12/07/07   01/07/08    John V. Warren                      
 

          Press Box/Storage/Concession:
99-0570   New Construction             7-020-001  03/14/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pump House:
21-1428   New Construction             7-025-001  04/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

SCHOHARIE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-12-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
94-1087   Reconstruction               0-001-002  04/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0499   Reconstruction               0-001-004  01/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0093   Reconstruction               0-001-005  01/22/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0244   Additions and Alterations    0-001-006  03/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001            19,916                  12/20/04   01/20/05    LeChase Constuction                 
                                                            001               932                  12/22/04   12/28/04    Campito Plumbing                    
                                                            001             3,183                  12/20/04   12/28/04    Merit Plumbing                      
                                                            002            14,256                  12/20/04   01/20/05    LeChase Construction                
                                                            002             1,526                  12/20/04   12/28/04    Two Brothers Contracting            
                                                            002             1,307                  12/20/04   12/28/04    Merit Plumbing                      
                                                            002             1,199                  12/20/04   12/28/04    Justin Electrical                   
                                                            003                 0                  12/20/04   12/28/04    Two Brothers Contracting            
                                                            003                 0                  12/20/04   12/28/04    Valley Equipment                    
                                                            003             1,638                  12/20/04   12/28/04    LeChase Construction                
                                                            003               844                  05/07/08     /  /      CAMPITO PLUMBING & HEATING          
                                                            004             6,528                  12/20/04   12/28/04    Campito Plumbing                    
                                                            004             1,675                  12/20/04   12/28/04    LeChase Construction                
                                                            004              -128                  12/20/04   12/28/04    Two Brothers Contracting            
                                                            005             1,888                  12/20/04   12/28/04    Merit Plumbing                      
                                                            005             2,118                  12/20/04   12/28/04    Justin Electrical                   
                                                            005             1,045                  02/16/05   03/18/05    Campito Plumbing Heating            
                                                            006                 0                  12/20/04   12/28/04    LeChase Construction                
                                                            006               440                  12/20/04   12/28/04    Justin Electrical                   
                                                            006               440                  09/27/06   01/09/07    Justin electrical                   
                                                            007               125                  12/20/04   12/28/04    LeChase Construction                
                                                            007                 0                  04/11/05   04/27/05    Two Brothers Contracting            
                                                            008               721                  12/20/04   12/28/04    LeChase Construction                
                                                            008               730                  02/16/05   03/18/05    Campito Plumbing heating            
                                                            008            14,565                  03/16/05   04/14/05    Merit Plumbing Heating              
                                                            008            -7,883                  09/06/05   09/12/05    Two brothers Contracting            
                                                            009            11,983                  02/16/05   03/18/05    Justin Electrical                   
                                                            009            26,625                  03/16/05   04/14/05    Campito Plumbing Heting             
                                                            009            -1,418                  03/16/05   04/14/05    Merit Plumbing Heating              
                                                            009                 0                  10/18/05   10/27/05    Valley Equipment                    
                                                            010            -2,418                  03/16/05   04/14/05    Campito Plumbing Heating            
                                                            010             1,459                  04/11/05   04/27/05    Merit Plumbing Heating              
                                                            010              -200                  09/06/05   09/12/05    Two Brothers Contracting            
                                                            010           -38,885                  01/17/06   11/03/06    Valley Equipment                    
                                                            010               278                  05/07/08     /  /      JUSTIN ELECTRICAL                   
                                                            011               537                  02/16/05   03/18/05    Justin Electrical                   
                                                            011             1,182                  04/11/05   04/27/05    Merit Plumbing heating              
                                                            011              -400                  10/18/05     /  /      Two Brothers Contracting            
                                                            011               253                  01/17/06   11/03/06    Valley Equipment                    
                                                            011              -400                  05/07/08     /  /      CAMPITO PLUMBING & HEATING          
                                                            011               537                  05/07/08     /  /      JUSTIN ELECTRICAL                   
                                                            011              -400                  05/07/08     /  /      TWO BROTHERS CONTRACTING            
                                                            012             1,611                  02/16/05   03/11/05    Lechase Construction                
                                                            012             2,956                  03/16/05     /  /      LeChase Construction Service        
                                                            012             1,670                  09/06/05   09/12/05    Merit Plumbing Heating              
                                                            012             1,611                  11/04/05   06/30/06    LECHASE CONSTRUCTION SERVICES       
                                                            012             1,611                  05/07/08     /  /      LECHASE CONSTRUCTION SERVICES       
                                                            013             1,402                  04/11/05   04/27/05    Merit Plumbing Heating              
                                                            013              -278                  04/11/05   04/27/05    Justin Electrical                   
                                                            013              -278                  09/27/06   01/09/07    Justin Electrical                   
                                                            014             1,995                  01/24/05   02/11/05    LeChase Construction                
                                                            014              -428                  05/16/06   06/22/06    Two Brothers Contracting            
                                                            014                 0                  05/16/06   04/11/07    Merit Plumbing heating              
                                                            014            -1,418                  09/20/06     /  /      Justin Electrical                   
                                                            015                 0                  10/18/05   10/27/05    Merit Plumbing Heating              
                                                            015                 0                  05/13/06     /  /      Valley Equipment                    
                                                            015                 0                  05/16/06   06/14/06    Valley Equipment Co.                
                                                            016              -730                  01/24/05   02/11/05    LeChase Construction Service        
                                                            016             1,445                  04/11/05   04/27/05    Justin Electrical                   
                                                            016                 0                  01/17/06   06/06/06    Merit Plumbing Heating              
                                                            017             1,674                  01/24/05   02/11/05    Lechase Construction                
                                                            017               155                  04/11/05   04/27/05    Justin eelctrical                   
                                                            017                 0                  05/16/06   07/27/06    Campito Plumbing                    
                                                            018             2,045                  02/16/05   03/11/05    LeChase Construction                
                                                            018               159                  04/11/05   04/27/05    Justin Electrical                   
                                                            018               723                  07/13/06   08/14/06    Valley equipment                    
                                                            019               329                  02/16/05   03/11/05    LeChase Construction                
                                                            019               170                  09/06/05   09/12/05    Justin Electrical                   
                                                            019                 0                  01/17/06   06/06/06    Merit Plumbing Heating              
                                                            019                 0                  05/16/06   07/27/06    Campito Plumbing                    
                                                            020               223                  09/06/05   09/12/05    Justin Electrical                   
                                                            020                 0                  05/16/06   07/20/06    Merit Plumbing Heating              
                                                            020                 0                  10/31/06   01/09/07    Campito Plumbing                    
                                                            021               368                  09/06/05   09/12/05    Justin electrical                   
                                                            021              -630                  05/16/06   06/14/06    Campito Plumbing                    
                                                            022             1,420                  02/16/05   03/11/05    LeChase Construction                
                                                            022               925                  09/06/05   09/12/05    Justin electrical                   
                                                            023            11,855                  03/16/05   04/14/05    LeChase Construction                
                                                            024               340                  02/16/05   03/11/05    LeChase Construction                
                                                            024               776                  09/06/05   09/12/05    Justin electrical                   
                                                            024                 0                  07/13/06   12/27/06    Merit plumbing Heating              
                                                            025               276                  09/06/05   09/12/05    Justin Electrical                   
                                                            026             1,381                  02/16/05   03/18/05    LeChase Construction                
                                                            027               288                  02/16/05   03/18/05    LeChase Construction                
                                                            028             3,359                  09/06/05   09/12/05    Justin Electrical                   
                                                            029            -4,418                  04/11/05   04/27/05    LeChase Construction                
                                                            029                 0                  10/18/05   10/27/05    Justin electrical                   
                                                            030            -1,720                  04/11/05   04/27/05    LeChase Construction Service        
                                                            031             1,347                  03/16/05   04/14/05    LeChase Construction                
                                                            031                 0                  01/17/06   06/06/06    Justin Electrical                   
                                                            032             2,956                  03/16/05   07/25/05    LeChase construction Services       
                                                            033             1,317                  03/16/05   04/14/05    LeChase Construction Service        
                                                            035            11,989                  04/11/05   04/27/05    LeChase Construction                
                                                            036               684                  04/11/05   04/27/05    LeChase Construction                
                                                            036           -12,000                  01/17/06   06/08/06    Justin Electrical                   
                                                            036           -12,000                  05/07/08     /  /      JUSTIN ELECTRICAL                   
                                                            037               260                  04/11/05   04/27/05    LeChase Construction Service        
                                                            038             2,538                  04/11/05   04/27/05    LeChase Construction                
                                                            038             1,896                  01/17/06   06/06/06    Justin Electrical                   
                                                            039               133                  04/11/05   04/27/05    LeChase Construction Service        
                                                            039                 0                  01/17/06   06/06/06    Justin Electrical                   
                                                            041            19,503                  09/06/05   09/12/05    LeChase Construction                
                                                            041                 0                  07/13/06   12/27/06    Justin Electrical                   
                                                            043             1,698                  09/06/05   09/12/05    LeChase Construction                
                                                            044                 0                  09/06/05   09/12/05    LeChase construction                
                                                            045                 0                  05/16/06   07/27/06    Justin electrical                   
                                                            047                 0                  01/17/06   06/08/06    LeChase Construction                
                                                            047                 0                  03/17/06   11/03/06    justin Electrical                   
                                                            048                 0                  01/17/06   06/08/06    LeChase Construction                
                                                            049                 0                  10/18/05   10/28/05    LeChase Construction                
                                                            050                 0                  10/18/05   10/28/05    LeChase Construction Service        
                                                            051                 0                  07/13/06   12/27/06    Justin Electrical                   
                                                            052                 0                  01/17/06   06/08/06    LeChase Construction Service        
                                                            054                 0                  10/18/05   10/28/05    LeChase Construction Service        
                                                            054                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            055                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            056             1,517                  05/16/06   07/27/06    Justin Electrical                   
                                                            058                 0                  05/16/06   07/20/06    Justin electrical                   
                                                            059               242                  05/16/06   06/14/06    LeChase Construction                
                                                            059                 0                  05/16/06   07/20/06    Justin electrical                   
                                                            060                 0                  05/16/06   06/14/06    LeChase Construction                
                                                            061                 0                  05/16/06   07/20/06    Justin Electrical                   
                                                            062             5,390                  05/16/06   06/14/06    LeChase Construction                
                                                            063               367                  07/13/06   12/27/06    Justin Electrical                   
                                                            065             1,301                  05/16/06   06/14/06    LeChase Construction                
                                                            070               180                  03/17/06   06/07/06    LeChase Construction                
                                                            071            -2,800                  03/17/06   06/07/06    LeChase Construction                
                                                            072               428                  03/17/06   06/07/06    LeChase Construction                
                                                            078               916                  05/16/06   06/14/06    LeChase Construction                
                                                            080             3,562                  03/17/06   11/03/06    LeChase Construction                
                                                            082                 0                  05/16/06   06/14/06    LeChase Construction                
                                                            083             1,553                  05/16/06   06/14/06    LeChase Construction                
                                                            089             2,661                  03/17/06   06/07/06    LeChase Construction                
                                                            090            -2,500                  03/17/06   06/07/06    LeChase Construction                
                                                            093             1,110                  03/17/06   06/07/06    LeChase Construction Service        
                                                            095             1,423                  05/16/06   06/14/06    LeChase Construction                
                                                            095             1,423                  05/16/06     /  /      LeChase Construction                
                                                            096             5,725                  05/16/06   06/14/06    LeChase Construction                
                                                            103            -3,600                  07/13/06   08/14/06    LeChas Construction                 
                                                            104             3,189                  07/12/06   08/14/06    LeChase Construction                
                                                            105             5,080                  07/13/06   08/14/06    LeChase Construction                
                                                            106             1,110                  09/20/06   10/19/06    LeChase Construction                
                                                            107             1,290                  09/20/06   10/19/06    LeChase Construction                
                                                            108               548                  09/20/06   10/19/06    Lechase Construction                
                                                            112               950                  09/20/06   10/19/06    LeChase Construction                
                                                            ACM-11           -128                  11/04/05   06/30/06    TWO BROTHERS CONTRACTING            
                                                            CH-1              725                  11/04/05   11/12/05    CAMPITO PLUMBING & HEATING          
                                                            E-11            1,445                  11/04/05   06/30/06    JUSTIN ELECTRICAL                   
                                                            GC-11               0                  11/04/05     /  /      LECHASE CONSTRUCTION SERVICES       
                                                            H-11              725                  11/04/05     /  /      CAMPITO PLUMBING & HEATING          
                                                            RCM-11           -400                  11/04/05   06/30/06    TWO BROTHERS CONTRACTING            
 
05-0492   Reconstruction               0-001-007  03/02/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -3,221                  10/13/06   11/03/06    T MC Elligott                       
                                                            002                 0                  11/15/06   01/30/07    Brunswick Electric                  
                                                            003                 0                  10/13/06   11/03/06    T MCElligott                        
                                                            006                 0                  10/13/06   11/03/06    WB roofing and Sheet Metal          
                                                            009                 0                  10/13/06   11/03/06    WB roofing and Sheet Metal          
                                                            010             6,176                  10/13/06   11/03/06    Wb roofing and Sheet metal          
                                                            012             3,993                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            013               956                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            014             3,378                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            015               882                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            017             7,717                  11/15/06   01/09/07    WB roofing Sheet Metal              
                                                            019             1,813                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            021            13,167                  11/15/06   01/09/07    WB roofing Sheet Metal              
                                                            022              -128                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            027              -372                  01/31/07   02/22/07    WB Roofing Sheet Metal              
                                                            029               693                  01/31/07   02/22/07    WB Roofing                          
 
07-1099   Additions and Alterations    0-001-009  07/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          10,377                  05/08/09   07/31/09    EXCEL INSULATION CO INC             
                                                            AC-02           1,840                  09/03/09   09/21/09    EXCEL INSULATION CO INC             
                                                            EC-01          -3,749                  04/20/10   08/05/10    JUSTIN ELECTRICAL INC               
                                                            GC-01          28,200                  05/15/09   07/28/09    L.G. WHITE & SONS, INC              
                                                            GC-02          14,812                  05/06/10   07/20/10    L.G. WHITE & SONS INC               
                                                            MC-01           3,116                  08/24/09   09/14/09    T LEMME MECHANICAL INC              
                                                            MC-02         -19,382                  04/20/10   08/05/10    T. LEMME MECHANICAL INC             
                                                            TC-01           2,619                  10/19/09   11/12/09    SYRACUSE SCENERY & STAGE LIGHTING   
 
10-0005   Reconstruction               0-001-011  02/14/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0936   Reconstruction               0-001-012  05/05/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-01          8,680                  09/16/11   11/23/11    NIRAM INC                           
 
11-1377   Reconstruction               0-001-013  11/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0677   Reconstruction               0-001-014  05/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-02            -521                  02/15/13   05/17/13    NEOPLANTA RESTORATION INC           
                                                            AA-03            -368                  03/12/13   05/31/13    NEOPLANTA RESTORATION INC           
                                                            CC-02           2,912                  09/30/13   10/25/13    Matrix Communications               
                                                            EC-02           2,261                  01/02/13   04/07/14    Justin Electrical, Inc.             
                                                            EC-04          15,398                  02/15/13   09/19/13    JUSTIN ELECTRICAL INC               
                                                            EC-06           2,692                  03/12/13   10/25/13    JUSTIN ELECTRICAL INC               
                                                            EC-07           1,193                  04/18/13   07/26/13    JUSTIN ELECTRICAL INC               
                                                            GC-01R         -7,650                  05/23/14   06/16/14    Bennett Contracting, Inc.           
                                                            HC-01          11,347                  01/02/13   08/12/13    D & E Technologies, Inc.            
                                                            PL - 01         2,118                  10/15/12   07/26/13    Mazone Plumbing and Heating, Inc.   
 
13-1299   Reconstruction               0-001-015  04/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01           2,060                  12/11/14   12/22/14    Mid State Industries, Ltd.          
 
14-0923   Reconstruction               0-001-017  03/20/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01         -13,000                  11/16/15   01/15/16    Caysea Contracting Corp.            
                                                            GC-01          -3,612                  09/18/15   11/24/15    Bast Hatfield Construction LLC      
                                                            GC-02               0          -4,917  12/10/15   12/28/15    Bast Hatfield Construction LLC      
                                                            RC-01          -3,054                  09/18/15   11/19/15    Titan Roofing, Inc.                 
                                                            RC-02         -22,300                  11/16/15   01/15/16    Titan Roofing, Inc.                 
 
14-0845   Reconstruction               0-001-018  10/26/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0181   Additions and Alterations    0-001-019  02/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01          11,805                  12/20/19   01/10/20    GARNET TECHNOLOGY SOLUTIONS, INC.   
                                                            CC-02           1,876                  01/14/20   01/27/20    GARNET TECHNOLOGY SOLUTIONS, INC.   
                                                            CC-03             577                  07/17/20   08/26/20    GARNET TECHNOLOGY SOLUTIONS, INC.   
                                                            CC-04           5,415                  12/11/20   02/25/21    GARNET TECHNOLOGY SOLUTIONS, INC.   
                                                            CC-05           5,118                  12/11/20   02/25/21    GARNET TECHNOLOGY SOLUTIONS, INC.   
                                                            CC-06          -7,176                  12/11/20   02/25/21    GARNET TECHNOLOGY SOLUTIONS, INC.   
                                                            EC-02          18,060                  10/21/20   12/30/20    GROSS ELECTRIC, INC.                
                                                            EC-03          -1,234                  12/11/20   02/25/21    GROSS ELECTRIC, INC.                
                                                            GC-01        -109,633                  08/30/19   09/13/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-02          33,094                  10/08/19   10/15/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-03          34,822                  11/29/19   12/05/19    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-04          34,822                  11/29/19   12/05/19    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-05          29,516                  11/29/19   12/05/19    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-06          34,797                  12/13/19   12/27/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-07          24,902                  12/20/19   01/27/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-08          27,205                  01/14/20   02/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-09          11,594                  03/12/20   07/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-10           8,199                  06/12/20   08/07/20    Bast Hatfield                       
                                                            GC-11          20,371                  06/12/20   08/06/20    Bast Hatfield                       
                                                            GC-12          30,854                  06/12/20   08/06/20    Bast Hatfield                       
                                                            GC-13           5,457                  06/30/20   07/27/20    BAST HATFIELD CONSTRUCTION, INC.    
                                                            GC-14          12,948                  06/30/20   07/27/20    BAST HATIELD CONSTRUCTION, LLC      
                                                            GC-15          20,479                  08/14/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-16           9,475                  08/14/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-17          14,084                  08/14/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-18          29,879                  08/14/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-19          20,270                  08/14/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-20          25,605                  08/14/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-21          20,164                  08/14/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-22           5,718                  09/17/20   11/06/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-22          21,640                  09/17/20   01/06/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-24           7,403                  09/17/20   11/06/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-25           8,535                  09/17/20   11/06/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-26          62,261                  09/17/20   11/06/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-27          21,686                  10/21/20   01/08/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-28          28,604                  10/21/20   01/08/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-29          28,604                  10/21/20   01/08/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-30          28,895                  10/21/20   01/08/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-31          17,442                  12/11/20   02/25/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-32           5,735                  12/11/20   02/25/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-33          13,542                  12/11/20   02/25/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            LC-01          15,277                  06/12/20   08/06/20    Facilities Equipment and Service    
                                                            MC-01           1,895                  06/12/20   07/20/20    Collett Mechanical                  
                                                            MC-02          -4,149                  12/11/20   02/25/21    COLLETT MECHANICAL, INC.            
                                                            MC-04         -63,154                  12/11/20   02/25/21    COLLETT MECHANICAL, INC.            
                                                            MCR-01           -656                  12/11/20   02/25/21    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-01           5,100                  06/30/20   07/28/20    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-02          68,492                  09/24/20   11/10/20    TRI-VALLEY PLUMBING AND HEATING,INC.
                                                            PC-03           3,292                  12/11/20   02/25/21    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-04           1,542                  12/11/20   02/25/21    TEI-VALLEY PLUMBING & HEATING, INC. 
                                                            SC-01           5,950                  02/13/20   03/20/20    COMALLI GROUP, INC.                 
                                                            SC-02           3,000                  08/24/20   11/04/20    COMALLI GROUP, INC.                 
                                                            SC-03           7,300                  12/11/20   02/25/21    COMALLI GROUP, INC.                 
                                                            TC-02          12,141                  11/29/19   12/17/19    TECHNICAL BUILDING SERVICES         
                                                            TC-05          -6,098                  09/17/20   11/12/20    TECHNICAL BUILDING SERVICES         
 
17-0553   Reconstruction               0-001-020  02/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01           5,717                  04/23/19   04/24/19    TWO BROTHERS CONTRACTING            
                                                            AA-02               0                  01/11/19   02/06/19    TWO BROTHERS CONTRACTING            
                                                            AA-03         -13,390                  04/29/19   04/29/19    TWO BROTHERS CONTRACTING            
                                                            AA-05          -1,186                  04/29/19   04/29/19    TWO BROTHERS CONTRACTING            
                                                            EC-01          -2,567                  01/11/19   02/06/19    KASSELMAN ELECTRIC CO. INC.         
                                                            PC-01           3,523                  01/11/19   02/06/19    RMB MECHANICAL INC.                 
                                                            PC-02             233                  01/11/19   02/06/19    RMB MECHANICAL INC.                 
                                                            PC-03          -3,600                  04/29/19   04/29/19    RMB MECHANICAL INC.                 
 
20-0518   Reconstruction               0-001-022  02/04/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           7,583                  07/29/21   04/06/22    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-02          31,511                  08/06/21   04/13/22    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-03          12,431                  10/18/21   12/01/22    Bast Hatfield Const LLC             
                                                            GC-03          12,431                  09/21/21   12/05/22    Bast Hatfield Construction LLC      
                                                            GC-04           2,500                  12/17/21   01/13/23    BAST HATFIELD                       
                                                            MC-01           8,479                  12/17/21   01/23/23    CRISAFULLI BROS                     
 
22-1089   Reconstruction               0-001-023  03/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0936   Reconstruction               0-001-024  02/02/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,195                  05/24/23   01/02/24    TBC INDUSTRIES                      
 
02-0993FP Reconstruction               0-001-FP1  01/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary School:
94-0045   Reconstruction               0-002-001  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1088   Reconstruction               0-002-002  04/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1616   Reconstruction               0-002-003  07/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0500   Additions and Alterations    0-002-004  01/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0245   Additions and Alterations    0-002-005  03/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             1,679                  12/20/04   12/28/04    Valley Equipment                    
                                                            001               736                  12/20/04   12/28/04    Justin Electrical                   
                                                            001             3,151                  09/27/06   10/19/06    Two brothers                        
                                                            002               729                  12/20/04   12/28/04    Campito Plumbing                    
                                                            002               164                  12/20/04   12/28/04    Valley Equipment                    
                                                            003               844                  12/20/04   12/28/04    Campito Plumbing                    
                                                            003             4,182                  12/20/04   12/28/04    Merit Plumbing                      
                                                            003             1,199                  12/20/04   12/28/04    Justin Electrical                   
                                                            004               314                  12/20/04   12/28/04    Valley Equipment                    
                                                            004               535                  12/20/04   12/28/04    Merit Plumbing                      
                                                            004              -128                  12/20/04   12/28/04    Two Brothers Contracting            
                                                            004               297                  12/20/04   12/28/04    Justin Electrical                   
                                                            005             1,339                  12/20/04   12/28/04    Two Brothers Contracting            
                                                            005            -7,000                  12/20/04   12/28/04    LeChase Construction                
                                                            005            -5,424                  10/18/05   10/28/05    Valley Equipment                    
                                                            006             9,000                  12/20/04   12/28/04    Two Brothers Contracting            
                                                            006               502                  02/16/05   03/18/05    Merit Plumbing Heating              
                                                            006            13,324                  10/18/05   10/28/05    Valley Equipment                    
                                                            007             1,037                  01/24/05   02/11/05    Justin electrical                   
                                                            007                 0                  02/16/05   03/18/05    Merit Plumbing Heating              
                                                            007             2,378                  02/16/05   03/18/05    Campito Plumbing Heating            
                                                            007                 0                  10/18/05   10/28/05    Valley Equipment                    
                                                            008               614                  01/24/05   02/11/05    Justin electrical                   
                                                            008                 0                  01/17/06   11/03/06    Valley Equipment                    
                                                            009               348                  12/20/04   12/28/04    LeChase Construction                
                                                            009            -4,036                  09/06/05   09/12/05    Two Brothers Contracting            
                                                            009            26,625                  05/07/08     /  /      CAMPITO PLUMBING & HEATING          
                                                            010             1,964                  12/20/04   12/28/04    LeChase Construction                
                                                            010            -2,418                  05/07/08     /  /      CAMPITO PLUMBING & HEATING          
                                                            011             1,802                  02/16/05   03/11/05    LeChase Construction                
                                                            011              -400                  07/13/06   12/27/06    CAMPITO PLUMBING                    
                                                            012            15,480                  02/16/05     /  /      Justin Electric                     
                                                            012             6,841                  01/17/06   11/03/06    Valley equipment                    
                                                            012                 0                  01/17/06   05/25/06    Campito Plumbing Heating            
                                                            012              -287                  01/17/06   01/24/06    Two Brothers Contracting            
                                                            013               768                  02/16/05   03/11/05    LeChase Construction                
                                                            013             3,526                  01/17/06   11/03/06    Valley equipment                    
                                                            013                 0                  01/17/06   05/25/06    Campito Plumbing heating            
                                                            013           -21,820                  05/16/06   06/22/06    Two brothers Contracting            
                                                            014            41,290                  01/17/06   11/03/06    Valley Equipment                    
                                                            014                 0                  01/17/06   06/06/06    Campito Plumbing Heating            
                                                            014            -1,418                  01/17/06   06/06/06    Justin Electrical                   
                                                            014                 0                  09/20/06   12/27/06    Campito Plumbing                    
                                                            015             2,583                  01/24/05   02/11/05    LeChase Construction                
                                                            015            -3,137                  10/18/05   10/27/05    Justin Electrical                   
                                                            015            -3,154                  10/31/06   01/09/07    Campito Plumbing                    
                                                            016             6,317                  03/17/06   06/07/06    Valley Equipment                    
                                                            016                 0                  05/16/06   07/27/06    Campito Plumbing heating            
                                                            016             6,317                  05/07/08     /  /      VALLEY EQUIPMENT CO.                
                                                            017                 0                  01/17/06   06/06/06    Merit Plumbing                      
                                                            017             6,750                  07/13/06   08/14/06    Valley equipment                    
                                                            018                 0                  01/17/06   06/06/06    Merit Plumbing Heating              
                                                            018                 0                  05/16/06   07/27/06    Campito Plumbing Heating            
                                                            020               417                  02/16/05   03/11/05    LeChase Construction                
                                                            021             1,746                  02/16/05   03/18/05    LeChase Construction                
                                                            021                 0                  05/16/06   07/20/06    Merit Plumbing                      
                                                            022               268                  09/06/05   04/30/08    Justin Electrical                   
                                                            022            -2,179                  03/17/06   06/07/06    Campito Plumbing Heating            
                                                            022                 0                  10/31/06   01/09/07    Merit plumbing                      
                                                            023            -2,562                  05/16/06   06/13/06    campito Plumbing Heating            
                                                            023                 0                  05/16/06   07/20/06    Merit Plumbing                      
                                                            024           -11,747                  05/16/06   06/22/06    Campito Plumbing heating            
                                                            025             2,538                  02/16/05   03/18/05    LeChase Construction                
                                                            025                 0                  03/17/06   11/03/06    Merit Plumbing Heating              
                                                            025               174                  07/13/06   12/27/06    Campito Plumbing Heatibng           
                                                            026               607                  09/06/05   09/12/05    Justin electrical                   
                                                            026           -10,363                  07/13/06   10/12/06    Merit Plumbing Heating              
                                                            027               281                  09/06/05   09/12/05    Justin electrical                   
                                                            027               301                  07/13/06   12/27/06    Merit Plumbing Heating              
                                                            028            11,003                  09/27/06   10/19/06    LeChase Construction                
                                                            030                 0                  10/18/05   10/27/05    Justin Electrical                   
                                                            033                 0                  01/17/06   06/06/06    Justin Electrical                   
                                                            034             1,575                  03/16/05   04/14/05    LeChase Construction Service        
                                                            034                 0                  10/18/05   10/27/05    Justin Electrical                   
                                                            035                 0                  10/18/05   10/27/05    Justin Electrical                   
                                                            036           -12,000                  05/07/08     /  /      JUSTIN ELECTRICAL                   
                                                            037                 0                  01/17/06   06/06/06    justin Electrical                   
                                                            040             3,082                  09/06/05   09/12/05    LeChase Construction Service        
                                                            040                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            042               999                  09/06/05   09/12/05    LeChase Construction                
                                                            042                 0                  05/16/06   07/27/06    Justin electrical                   
                                                            043                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            044                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            045                 0                  09/06/05   09/12/05    LeChase Construction Services       
                                                            046              -987                  10/18/05   10/28/05    LeChase Construction Service        
                                                            048                 0                  03/17/06   11/03/06    Justin Electrical                   
                                                            048                 0                  03/17/06     /  /      Justin Electrical                   
                                                            049                 0                  07/13/06   12/27/06    Justin Electrical                   
                                                            050                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            051                 0                  01/17/06   06/08/06    LeChase Construction                
                                                            052                 0                  10/18/05     /  /      LeChase Construction                
                                                            052                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            053                 0                  11/04/05   06/29/06    LECHASE CONSTRUCTION SERVICES       
                                                            055              -716                  01/17/06   06/08/06    LeChase Construction                
                                                            056                 0                  01/17/06   06/08/06    LeChase Construction                
                                                            057                 0                  01/17/06   06/08/06    LeChase Construction                
                                                            057                 0                  05/16/06   06/13/06    Justin Electrical                   
                                                            058             3,154                  09/20/06   10/19/06    Lechase Construction                
                                                            060                 0                  05/16/06   07/20/06    Justin electrical                   
                                                            061                 0                  03/17/06   06/07/06    LeChase Construction                
                                                            062                 0                  05/16/06   07/20/06    Justin electrical                   
                                                            063             1,906                  05/16/06   06/13/06    LeChase Construction                
                                                            064               608                  03/17/06   06/07/06    LeChase Construction                
                                                            064               225                  07/13/06   12/27/06    Justin Electrical                   
                                                            066               953                  05/16/06   06/13/06    LeChase Construction                
                                                            066               393                  07/13/06   12/27/06    Justin electrical                   
                                                            067             1,908                  05/16/06   06/13/06    LeChase Construction                
                                                            068             2,589                  05/16/06   06/13/06    LeChase Construction                
                                                            069             4,680                  05/16/06   06/13/06    LeChase Construction                
                                                            073                 0                  05/16/06   06/14/06    LeChase Construction                
                                                            074               654                  03/17/06   06/07/06    LeChase Construction                
                                                            075             8,634                  03/17/06   06/07/06    LeChase Construction                
                                                            076                80                  03/17/06   06/07/06    LeChase Construction                
                                                            077             1,258                  05/16/06   06/14/06    LeChase Construction                
                                                            079             5,144                  09/20/06   10/19/06    LeChase Construction                
                                                            081             1,414                  03/17/06   06/07/06    LeChase Construction                
                                                            084             2,195                  05/16/06   06/13/06    LeChase Construction                
                                                            085             2,444                  03/17/06   06/07/06    LeChase Construction                
                                                            086               359                  07/13/06   08/14/06    LeChase Construction                
                                                            087             2,625                  03/17/06   06/07/06    LeChase Construction                
                                                            088             2,163                  03/17/06   06/07/06    LeChase Construction                
                                                            091            -3,000                  03/17/06   06/07/06    LeChase Construction Service        
                                                            092              -702                  09/20/06   10/19/06    LeChase Construction                
                                                            094             2,562                  05/16/06   07/27/06    LeChase Construction                
                                                            097             5,981                  05/16/06   06/13/06    LeChase Construction                
                                                            098             4,929                  05/16/06   06/13/06    LeChase Construction                
                                                            099               727                  05/16/06   06/13/06    LeChase Construction                
                                                            100             4,230                  05/16/06   06/13/06    LeChase Construction                
                                                            101              -673                  09/20/06   10/19/06    LeChase Construction                
                                                            102            -1,878                  07/13/06   08/14/06    LeChae Construction                 
                                                            109             1,129                  09/20/06   10/19/06    LeChase Construction                
                                                            110             6,000                  09/20/06   12/18/06    LeChase Construction                
                                                            111             3,000                  09/20/06   10/19/06    LeChase Construction                
                                                            E-11           15,480                  11/04/05   06/30/06    JUSTIN ELECTRICAL                   
                                                            E-11           15,480                  11/04/05   06/30/06    JUSTIN ELECTRICAL                   
                                                            E-11              268                  11/04/05   04/30/08    JUSTIN ELECTRIAL                    
 
05-0493   Reconstruction               0-002-006  03/02/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  10/13/06   11/03/06    WB roofing Sheet metal              
                                                            001            -2,000                  11/15/06   01/09/07    WJV mechanical                      
                                                            001              -116                  11/15/06   01/30/07    Brunswick electric                  
                                                            002                 0                  10/13/06   11/03/06    Wb Roofing and Sheet metal          
                                                            002                 0                  10/13/06     /  /      T Mc Elligott                       
                                                            003                 0                  10/13/06   11/03/06    Wb Roofing and Sheet                
                                                            003              -510                  11/15/06   01/30/07    Brunswick Electric                  
                                                            004              -569                  10/13/06   11/03/06    T MC Elligott                       
                                                            004                 0                  10/13/06   11/03/06    Wb roofing and Sheet Metal          
                                                            005                 0                  10/13/06   11/03/06    T Mc Elligott Inc                   
                                                            005                 0                  10/13/06     /  /      Wb Roofing and Sheet Metal          
                                                            006            -1,858                  11/15/06   01/09/07    T Mc Elligott                       
                                                            007                 0                  10/13/06   11/03/06    Wb Roofing and Sheet                
                                                            008                 0                  10/13/06   11/03/06    WB Roofing and Sheet                
                                                            011              -274                  12/21/06   01/30/07    WB Roofing                          
                                                            016            -2,304                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            018               260                  11/15/06   01/09/07    WB Roofing Sheet metal              
                                                            020               916                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            023            -1,439                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            024              -227                  11/15/06   01/09/07    WB Roofing Sheet Metal              
                                                            025             1,388                  12/21/06   01/30/07    WB Roofing                          
                                                            026              -603                  01/31/06   02/22/07    BOVIS LEND LEASE                    
                                                            028                87                  01/31/07   02/22/07    WB Roofing and Sheet Metal          
 
07-1100   Reconstruction               0-002-008  07/11/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0006   Reconstruction               0-002-009  02/14/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0678   Reconstruction               0-002-010  05/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA - 01         4,200                  10/15/12   02/25/13    Neoplanta Restoration, Inc.         
                                                            CC-01           3,604                  05/16/13   07/03/13    Matrix Communications               
                                                            EC-01           2,719                  01/02/13   07/26/13    Justin Electrical, Inc.             
                                                            EC-03           2,111                  01/08/13   07/26/13    JUSTIN ELECTRICAL INC               
                                                            EC-05             501                  03/12/13   05/31/13    JUSTIN ELECTRICAL INC               
                                                            EC-08           4,841                  05/31/13   10/25/13    Justin Electrical, Inc.             
                                                            GC-01R         -7,650                  09/26/13   10/17/13    Bennett Contracting, Inc.           
                                                            HC-02          17,870                  01/02/13   08/29/13    D & E Technologies, Inc.            
                                                            HC-03          17,096                  06/26/13   10/25/13    D&E TECHNOLOGIES INC                
 
11-1378   Reconstruction               0-002-011  11/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0924   Reconstruction               0-002-013  03/20/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0554   Reconstruction               0-002-014  02/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-04          -3,084                  04/29/19   04/29/19    TWO BROTHERS CONTRACTING            
                                                            EC-02           1,955                  04/12/19   04/16/19    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-03           3,571                  02/13/20   03/20/20    KASSELMAN ELECTRIC CO.,INC.         
                                                            MC-01          34,270                  01/11/19   02/06/19    T. MCELLIGOTT, INC.                 
                                                            MC-02          26,578                  01/11/19   02/06/19    T. MCELLIGOTT, INC.                 
                                                            MC-03          63,314                  01/11/19   02/12/19    T. MCELLIGOTT, INC.                 
                                                            MC-04         -24,890                  04/29/19   04/29/19    T. MCELLIGOTT, INC.                 
 
18-0182   Additions and Alterations    0-002-015  02/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          16,017                  06/12/20   07/20/20    Gross Electric                      
                                                            MC-03          -7,693                  12/11/20   02/25/21    COLLETT MECHANICAL, INC.            
                                                            TC-01          21,132                  08/30/19   09/03/19    TECHNICAL BUILDING SERVICES         
                                                            TC-03          19,672                  11/29/19   12/17/19    TECHNICAL BUILDING SERVICES         
                                                            TC-04          -3,267                  02/19/20   06/09/20    TECHNICAL BUILDING SERVICES         
                                                            TC-06           9,981                  12/11/20   02/25/21    TECHNICAL BUILDING SERVICES         
                                                            TC-07           6,950                  12/11/20   02/25/21    TECHNICAL BUILDING SERVICES         
 
21-0735   Reconstruction               0-002-016  03/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1090   Reconstruction               0-002-017  03/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0345   Reconstruction               0-002-018  09/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Storage Bldg.:
97-0777   New Construction             2-006-001  01/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
94-1089   Reconstruction               5-005-001  04/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0501   Additions and Alterations    5-005-002  01/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0246   Reconstruction               5-005-003  03/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            032                 0                  01/17/06   06/06/06    Justin Electrical                   
                                                            046                 0                  03/17/06     /  /      Justin Electrical                   
                                                            046                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            053                 0                  05/16/06   07/27/06    Justin Electrical                   
                                                            065             9,000                  07/13/06   12/27/06    Justin electrical                   
 
10-0007   Reconstruction               5-005-004  02/14/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0512   Reconstruction               5-005-005  02/02/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01         -10,000                  06/04/12   10/25/12    TITAN ROOFING                       
 
11-1379   Reconstruction               5-005-006  11/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1295   Reconstruction               5-005-007  11/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,000                  07/14/14   08/29/14    CDE Electric, Inc.                  
                                                            HC-01           7,923                  03/26/14   04/18/14    Northeast Petroleum Technologies    
 
13-0530   Reconstruction               5-005-008  04/07/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01R         -7,060                  02/24/15   03/17/15    CDE Electric, Inc.                  
                                                            GC-01          34,345                  10/10/14   10/16/14    Bast Hatfield Construction LLC      
                                                            GC-02           5,166                  10/10/14   10/16/14    Bast Hatfield Construction LLC      
 

          District-Wide:
99-0289   Reconstruction               7-999-001  01/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               1,800                  12/14/00   01/14/03    T. Lemme Mech.                      
 

SHARON SPRINGS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 54-14-01-04
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
93-0177   Alterations                  0-001-006  09/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0247   Additions and Alterations    0-001-008  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0615   Additions and Alterations    0-001-009  01/26/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1685   Reconstruction               0-001-011  06/03/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10            116,740                  06/20/02   06/20/02    Bette & Cring                       
                                                            2              50,128                  06/20/02   06/20/02    Bette & Cring                       
                                                            2              27,656                  06/20/02   06/20/02    Dwight Elec.                        
                                                            3              20,732                  06/20/02   06/20/02    Dwight Elec.                        
                                                            4              32,920                  06/20/02   06/20/02    Dwight Elec.                        
                                                            5              13,922                  06/20/02   06/20/02    Dwight Elec.                        
                                                            8               2,109                  06/20/02   06/20/02    Bette & Cring                       
                                                            9              47,913                  06/20/02   06/20/02    Bette & Cring                       
                                                            GC-5                0                  06/20/02   06/20/02    Bette & Cring                       
                                                            GC-6           16,115                  06/20/02   06/20/02    Bette & Cring                       
                                                            GC-7           19,780                  06/20/02   06/20/02    Bette & Cring                       
                                                            P-3            18,600                  06/20/02   06/20/02    Teitsch-Kent-Fay                    
 
97-1842   Reconstruction               0-001-012  07/16/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1757   Additions and Alterations    0-001-013  11/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-1         -38,000                  04/18/02     /  /      Precision Site Work                 
                                                            101-2               0                  09/25/02   10/02/02    Precision Site Work                 
                                                            101-3               0                  11/27/02   02/18/03    Precision Site Work                 
                                                            102-1         -49,480                  04/18/02   05/10/02    Murnane Building Contractors        
                                                            102-3         -10,921                  09/12/02   10/28/02    Murnane Building Contractors        
                                                            102-7           8,605                  05/27/03   06/02/03    Murnane Building Contractors        
                                                            103-1          -2,600                  04/18/02     /  /      DiGesare Mechanical                 
                                                            103-2               0                  11/27/02   02/18/03    DiGesare Mechanical                 
                                                            103-3             843                  01/15/03   02/19/03    DiGesare Mechanical                 
                                                            103-5           3,764                  02/12/03   02/20/03    DiGesare Mechanical                 
                                                            104-1         -36,500                  04/18/02     /  /      Schenectady Hardware and Electric   
                                                            104-2            -784                  11/27/02   02/18/03    Schenectady Hardware and Electric   
                                                            105-1          -2,502                  04/18/02     /  /      DiGesare Mechanical                 
                                                            105-2            -758                  08/22/02   10/28/02    DiGesare Mechanical                 
                                                            105-3               0                  05/27/03   06/02/03    DiGesare Mechanical                 
                                                            105-4         -17,690                  08/19/03   09/09/03    DiGesare Mechanical                 
 
09-0691   Reconstruction               0-001-014  05/10/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            18,958                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            001                 0                  06/08/11   06/10/11    HJ BRANDELES CORPORATION            
                                                            001            15,367                  06/08/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            001            15,642                  02/03/12   07/20/12    GENERAL MECHANICAL SYSTEMS INC      
                                                            002               932                  05/16/11   06/03/11    RIDLEY ELECTRIC CO INC              
                                                            002             8,359                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            002             2,656                  06/08/11   06/10/11    HJ BRANDELES CORPORATION            
                                                            002             9,383                  03/30/12   09/06/12    GENERAL MECHANICAL SYSTEMS INC      
                                                            003            -9,770                  06/08/11   06/10/11    BAST HATFIELD INC                   
                                                            003             9,729                  01/25/12   07/20/12    RIDLEY ELECTRIC CO INC              
                                                            004            19,853                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            004             7,373                  01/25/12   07/20/12    RIDLEY ELECTRIC CO INC              
                                                            005            14,152                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            006            19,573                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            007             9,566                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            008            16,517                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            009            19,260                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            010            14,700                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            011            14,678                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            012            15,639                  05/16/11   06/03/11    BAST HATFIELD INC                   
                                                            013            17,442                  02/03/12   05/23/12    BAST HATFIELD INC                   
                                                            014            34,538                  02/03/12   05/23/12    BAST HATFIELD INC                   
                                                            015            31,031                  02/03/12   05/23/12    BAST HATFIELD INC                   
                                                            016            34,601                  02/03/12   05/23/12    BAST HATFIELD INC                   
 
15-0565   Reconstruction               0-001-015  08/27/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0287   Reconstruction               0-001-016  02/05/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0514   Reconstruction               0-001-017  03/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0493   Reconstruction               0-001-018  03/13/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0494   Reconstruction               0-001-019  03/21/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0346   Additions and Alterations    0-001-020  01/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         13,668                  09/18/20   11/09/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-002         12,818                  09/18/20   11/09/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-003          8,939                  09/18/20   11/09/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-004          5,564                  09/18/20   11/09/20    BAST HATFIELD CONSTRUCTION, INC.    
                                                            GC-005         26,387                  09/18/20   11/09/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-006          1,152                  09/18/20   11/09/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            HM-001        -10,000                  09/18/20   11/09/20    ABSCOPE ENVIROMENTAL, INC.          
                                                            MC-001         13,131                  09/18/20   11/12/20    H.J. BRANDELES CORP.                
                                                            MC-002           -906                  09/18/20   11/12/20    H.J. BRANDELES CORP.                
                                                            P-001          -1,111                  09/18/20   11/12/20    H.J. BRANDELES CORP.                
                                                            SC-001         37,566                  09/18/20   11/09/20    COBLESKILL STONE PRODUCTS           
                                                            SC-002          8,809                  09/18/20   11/09/20    COBLESKILL STONE PRODUCTS           
                                                            SC-003          7,715                  09/18/20   11/09/20    COBLESKILL STONE PRODUCTS           
 
18-0234   Reconstruction               0-001-021  09/10/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         50,965                  06/24/20   08/05/20    APEX WINDOW FILM                    
                                                            GC-002         13,000                  06/24/20   08/05/20    APEX WINDOW FILM                    
 
19-1148   Reconstruction               0-001-022  02/07/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0327   Reconstruction               0-001-023  11/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0382   Reconstruction               0-001-024  01/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1829FA Additions and Alterations    0-001-025  10/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1092   Reconstruction               0-001-026  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0200   Reconstruction               0-001-027  08/02/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0345   Reconstruction               0-001-028  09/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-1034   Reconstruction               0-001-029  12/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBus Garage/Techn Bldg. See 5-005:
93-0178   Reconstruction               0-002-001  09/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Maintenance Facility see 0-002:
00-1758   New Construction             5-005-001  11/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-4         -22,140                  02/12/03   02/20/03    Precision Site Work                 
                                                            101-5        -110,435                  02/07/08   10/21/08    precision                           
                                                            102-2         -49,308                  04/18/02     /  /      Murnane Building Contractors        
                                                            102-4           8,925                  09/12/02   10/28/02    Aztec Plumbing                      
                                                            102-5          -2,100                  01/31/03   02/19/03    Murnane Building Contractors        
                                                            102-6           6,073                  04/09/03   04/18/03    Murnane Building Contractors        
                                                            103-4           4,220                  01/15/03   02/04/03    DiGesare Mechanical                 
                                                            103-6               0                  05/27/03   06/02/03    DiGesare Mechanical                 
                                                            103-7            -374                  11/07/03   12/18/03    DiGesare Mechanical                 
                                                            104-3               0                  01/15/03   02/19/03    Schenectady Hardware and Electric   
                                                            104-4               0                  02/12/03   02/20/03    Schenectady Hardware Electric       
                                                            104-5          -6,014                  06/25/03   07/11/03    Schenectady Hardware Electric       
 
22-1093   Reconstruction               5-005-002  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Verizon Wireless / Bus Radio Shared:
08-1304   New Construction             7-006-001  07/07/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Outdoor Pavilion:
22-0619FA New Construction             7-008-001  10/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE