Change Order Status - Schenectady


DUANESBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-01-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School/Middle School:
91-0041   Reconstruction               0-001-003  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0638   Reconstruction               0-001-005  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0610   Additions and Alterations    0-001-006  03/12/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL-5          153,500                  01/10/02   05/22/02    McCall Elec.                        
                                                            EL-6             -508                  07/01/02   07/03/02    McCall Elec.                        
                                                            GC-1           27,731                  07/02/02   07/05/02    Plank Const.                        
                                                            GC-2            8,757                  07/02/02   07/03/02    Plank Const.                        
                                                            GC-3 rev       48,725                  08/16/02   08/16/02    Plank Const.                        
                                                            GC-4 rev       44,045                  08/16/02   08/16/02    Plank Const.                        
                                                            GC-6          -10,280                  07/01/02   07/03/02    Plank Const.                        
                                                            HVAC-1         48,220                  01/10/02   05/22/02    Crisafulli Bros.                    
                                                            HVAC-2          1,568                  08/23/02   11/01/02    Crisafulli Bros.                    
                                                            HVAC-3         -2,650                  07/15/02   10/30/02    Crisafulli Bros.                    
                                                            PL-1           14,050                  01/10/02   05/22/02    Mazone Plumbing                     
                                                            PL-2           -6,243                  06/25/02   07/03/02    Mazone Plumbing                     
 
97-0189   Reconstruction               0-001-007  09/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0609   Reconstruction               0-001-009  02/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0450   Reconstruction               0-001-011  04/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,684                  07/26/06     /  /      Justin Electrical                   
 
05-0646   Reconstruction               0-001-012  05/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            El-001         -1,262                  12/15/06   01/12/07    Farina Electric                     
                                                            GC-001         -1,682                  12/29/06   01/23/07    LG White And Sons                   
                                                            Mech 001       -1,033                  11/28/06   01/09/07    Mazone Plumbing                     
 
06-0773   Reconstruction               0-001-014  04/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL-001         12,958                  08/22/07   01/16/08    Harold R. Clune                     
                                                            EL-002        -13,563                  12/04/07   04/03/08    HAROLD R. CLUNE, INC                
                                                            GC-001          6,821                  11/30/07   12/12/07    Bast Hatfield, Inc.                 
                                                            GC-002         87,000                  03/19/08   08/05/08    Bast Hatfield, Incorp.              
                                                            GC-003          5,317                  12/18/08     /  /      Bast Hatfield, Inc.                 
                                                            GC-004         -5,076                  05/19/08   09/29/08    Bast Hatfield, Inc.                 
                                                            HVAC-001       -3,688                  05/13/08   03/02/09    Mazone Plumbing and Heating         
                                                            PL-001           -774                  03/19/08   01/23/09    Mazone Plumbing & Heating, Incorp.  
 
08-1221   Reconstruction               0-001-015  07/07/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -1,000                  06/29/10   08/10/10    J. MCBAIN ELECTRIC                  
                                                            MC-001         -1,000                  06/25/10   08/10/10    TRI-VALLEY PLUMBING & HEATING INC   
 
12-0772   Reconstruction               0-001-016  05/31/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         52,500                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-002         -3,844                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-003        -43,641                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-004          1,383                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-HM001            0                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-HM002            0                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-HM003            0                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-HM004            0                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            GC-HM005            0                  09/17/14   09/23/14    Bast Hatfield Construction, LLC     
                                                            RC-001        -26,171                  09/17/14   09/23/14    S.D. Carruthers, Inc.               
                                                            RC-HM001            0                  09/17/14   09/23/14    S.D. Carruthers, Inc.               
 
13-1523   Reconstruction               0-001-018  05/22/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,900                  01/29/15   02/02/15    Comalli Group Inc.                  
                                                            002             1,150                  01/29/15   02/02/15    Comalli Group Inc.                  
 
14-0489   Reconstruction               0-001-019  07/20/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0785   Reconstruction               0-001-020  09/16/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            HS-1-1         34,500                  03/04/19   03/15/19    PLANK CONSTRUCTION                  
                                                            HS-2-1            870                  03/04/19   03/08/19    BURNICHE PIPING, INC.               
                                                            HS-2-2          2,062                  03/04/19   03/08/19    BURNICHE PIPING, INC.               
                                                            HS-2-3          7,623                  03/04/19   03/08/19    BURNICHE PIPING, INC.               
                                                            HS-2-4         10,774                  03/04/19   03/08/19    BURNICHE PIPING, INC.               
                                                            HS-2-5            718                  03/04/19   03/08/19    BURNICHE PIPING, INC.               
                                                            HS-3-1          1,271                  03/04/19   03/14/19    CONDOR FIRE SPRINKLER CO.,INC.      
                                                            HS-3-2         -3,891                  03/04/19   03/08/19    CONDOR FIRE SPRINKLER CO.,INC.      
                                                            HS-4-1        -24,118                  03/04/19   03/08/19    CAMPITO PLUMBING & HEATING, INC.    
                                                            HS-5-1          6,338                  03/04/19   03/08/19    STILSING ELECTRIC, INC.             
                                                            HS-5-2         -3,500                  03/04/19   03/08/19    STILSING ELECTRIC, INC.             
                                                            HS-5-3           -963                  03/04/19   03/08/19    STILSING ELECTRIC, INC.             
                                                            HS-6-1        -14,477                  03/04/19   03/15/19    BMI                                 
 
23-0097   Reconstruction               0-001-021  01/03/24  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0476FP Reconstruction               0-001-FP1  11/15/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary:
90-1336CO Reconstruction               0-002-001  05/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0189CO Reconstruction               0-002-002  09/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0639   Reconstruction               0-002-004  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2235   Reconstruction               0-002-008  05/28/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -2,504                  03/30/05   04/18/05    Mc Leod Systems Inc                 
 
04-0284   Additions and Alterations    0-002-009  12/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -3,465                  06/07/06   09/29/06    Harold Clune                        
                                                            002            -1,467          51,450  08/08/06   10/13/06    Bast hatfield                       
                                                            GC-001         15,110                  03/01/06     /  /      Bast hatfield                       
                                                            PL-001        -29,288                  01/25/06   05/23/06    MERIT PLUMBING AND HEATING LLC      
                                                            mech 001      -19,711                  03/01/06   04/20/06    T McElligott                        
 
12-0773   Reconstruction               0-002-010  05/31/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-001        -26,171                  09/17/14   09/23/14    S.D. Carrauthers Sons, Inc.         
                                                            RC-ES001            0                  09/17/14   09/23/14    S.D. Carruthers, Inc.               
 
15-0146   Reconstruction               0-002-011  04/20/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            ES-1-1          1,045                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-10         4,404                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-11         1,257                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-12           -28                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-13        22,744                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-14      -111,241                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-15         2,091                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-16           780                  06/26/18   08/17/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-17         1,903                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-18         8,426                  06/28/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-19         9,842                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-2         29,645                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-20        58,738                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-21        43,964                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-22        16,051                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-23         2,432                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-24        52,520                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS          
                                                            ES-1-25        15,658                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-26         5,000                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-3        -20,268                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-4          2,028                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-5         19,000                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-6         -1,393                  06/26/18     /  /      HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-6         -1,393                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-7         38,000                  06/26/18     /  /      HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-7         38,000                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-7         38,000                  06/26/18   08/17/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-8         12,371                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-1-9          6,428                  06/26/18   07/30/18    HOOSICK VALLEY CONTRACTORS INC      
                                                            ES-2-1        -22,568                  06/26/18     /  /      ECKERT MECHANICAL SERVICE CORP      
                                                            ES-2-1        -22,568                  06/26/18     /  /      ECKERT MECHANICAL SERVICE CORP      
                                                            ES-3-1          1,337                  06/26/18     /  /      T. MCELLIGOTT PLUMBING INC          
                                                            ES-3-2         -2,202                  06/26/18   12/28/18    T.MCELLIGOTT PLUMBING INC           
                                                            ES-3-3           -733                  06/26/18   02/04/19    T. MCELLIGOTT PLUMBING INC          
                                                            ES-4-1         -6,036                  06/26/18   12/28/18    SCHENECTADY HARDWARE & ELECTRIC CO I
 
16-1359   Reconstruction               0-002-012  02/27/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0960   Reconstruction               0-002-013  03/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0098   Reconstruction               0-002-014  01/03/24  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0477FP Reconstruction               0-002-FP1  11/15/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXHigh School Relocatable - sold:
06-0774   Reconstruction               0-004-001  04/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003          5,317                  12/18/08   05/19/09    BAST HATFIELD, INC                  
 

          Bus Service Garage:
91-0042   Reconstruction               5-006-001  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2014   Reconstruction               5-006-002  06/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            48,270          48,270  10/14/04   10/25/04    Hoosick Valley Contractors          
                                                            0021            1,183                  12/09/04   12/28/04    Hoosick Valley Contractors          
                                                            SS-1           -1,773                  04/22/04   04/26/04    Florida Gulf Const.                 
 
02-1557   Reconstruction               5-006-003  04/01/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1           -1,000                  09/04/03   09/16/03    Henderson-Johnson                   
 
02-1930   Reconstruction               5-006-004  05/06/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MECH-1           -500                  04/01/04   04/08/04    TFR Industries                      
 
17-0101   Reconstruction               5-006-005  10/04/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
95-0365   Reconstruction               7-999-001  11/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE

SCOTIA-GLENVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-02-02-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Glendaal Elem. School:
90-0969   Reconstruction               0-001-005  03/08/91  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-27           -1,196                  02/28/03   03/11/03    Bast Hatfield                       
 
91-1066   Additions and Alterations    0-001-006  04/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1001   Reconstruction               0-001-007  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1033   Additions and Alterations    0-001-009  08/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-1              -814                  07/24/02   08/27/02    East Coast Haz Mat Removal          
                                                            1-2            -3,459                  08/19/02   10/28/02    East Coast Haz Mat Removal          
                                                            1-7            21,236                  04/11/03   04/18/03    East Coast Haz Mat Removal          
                                                            2-1           -21,600                  04/05/02   04/29/02    Bast Hatfield                       
                                                            2-11            1,312                  11/12/02   03/13/03    Bast Hatfield                       
                                                            2-14          -40,933                  11/12/02   03/13/03    Bast Hatfield                       
                                                            2-16            2,419                  12/11/02   01/10/03    Bast Hatfield                       
                                                            2-2            -1,554                  06/14/02   06/17/02    Bast Hatfield                       
                                                            2-20             -554                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-24            8,201                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-3            14,417                  07/03/02   07/15/02    Bast Hatfield                       
                                                            2-35           -3,500                  08/18/03   08/27/03    Bast Hatfield                       
                                                            2-4            -1,223                  07/03/02   07/15/02    Bast Hatfield                       
                                                            2-5             1,103                  07/25/02   10/28/02    Bast Hatfield                       
                                                            2-6              -971                  08/19/02   10/28/02    Bast Hatfield                       
                                                            2-7            20,623                  08/19/02   10/28/02    Bast Hatfield                       
                                                            2-8            -4,280                  09/03/02   10/21/02    Bast Hatfield                       
                                                            2-9b              790                  11/14/02   12/02/02    Bast Hatfield                       
                                                            3-1            -2,827                  05/03/02   05/13/02    Crisafulli Bros                     
                                                            3-2           115,450                  08/19/02   10/28/02    Crisafulli Bros                     
                                                            4-1             5,069                  09/03/02   10/21/02    DiGesare Mech.                      
                                                            4-4              -124                  01/17/03   03/12/03    DiGesare Mech.                      
                                                            5-1                 0                  03/07/02   04/05/02    Flex Elec.                          
                                                            5-16            1,880                  10/25/02   02/05/03    Flex Elec.                          
                                                            5-2               -55                  04/05/02   04/29/02    Flex Elec.                          
                                                            5-21            1,957                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-25            1,110                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-29            4,419                  12/20/02   02/18/03    Flex Elec.                          
                                                            5-3             9,283                  06/14/02   06/17/02    Flex Elec.                          
                                                            5-32              954                  12/13/02   01/13/03    Flex Elec.                          
                                                            5-34              790                  02/28/03   03/13/03    Flex Elec.                          
                                                            5-4            -1,072                  08/19/02   10/28/02    Flex Elec.                          
                                                            5-5               971                  08/19/02   10/28/02    Flex Elec.                          
                                                            5-6             3,104                  09/03/02   10/21/02    Flex Elec.                          
                                                            5-9rev.         3,671                  10/25/02   02/05/03    Flex Elec.                          
 
99-1595   Reconstruction               0-001-010  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1328   Reconstruction               0-001-012  01/17/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          31,760                  03/05/09   07/14/09    JAMES A. EDGAR COMPANY, INC.        
                                                            GC-02            -454                  06/17/09   11/12/09    JAMES A EDGAR COMPANY INC           
                                                            SC-02          12,195                  09/22/08   11/06/08    BELLAMY & SONS CONSTRUCTION COMPANY 
                                                            SC-03          10,925                  09/22/08   08/23/10    BALLAMY & SONS CONSTRUCTION COMPANY 
                                                            SC-04          16,540                  09/22/08   11/06/08    BELLAMY & SONS CONSTRUCTION COMPANY 
                                                            SC-05             824                  10/08/08   03/20/09    BELLAMY & SONS CONSTRUCTION COMPANY 
 
09-0605   Reconstruction               0-001-013  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0331   Reconstruction               0-001-014  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0921   Reconstruction               0-001-015  08/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1828   Reconstruction               0-001-017  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-05          -4,653                  11/26/18   01/23/19    CAYSEA CONTRACTING CORP.            
                                                            EC-04          -1,409                  11/26/18   01/09/19    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            EC-05          12,188                  11/26/18   01/09/19    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            GC-07          11,233                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-17          -1,794                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-18           3,737                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            MC-05           1,409                  11/26/18   01/09/19    T. LEMME MECHANICAL, INC.           
                                                            MC-08               0                  11/26/18   01/09/19    T. LEMME MECHANICAL, INC.           
                                                            SC-01           8,609                  12/21/17   01/29/18    Bellamy Construction Company, Inc.  
 
15-1814   Reconstruction               0-001-018  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1106   Reconstruction               0-001-020  03/21/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0971   Reconstruction               0-001-021  06/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-002        -36,540                  07/21/23   12/18/23    S&L ROOFING & SHEETMETAL            
                                                            SC-005         -1,052                  10/05/22   12/15/23    James Maloy Inc                     
                                                            SC2-002        11,580                  09/20/23     /  /      ADIRONDACK LANDSCAPING              
 
94-1002EP Energy Project               0-001-E01  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
90-0970   Reconstruction               0-002-006  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1003   Reconstruction               0-002-007  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1475   Reconstruction               0-002-008  06/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0170   Reconstruction               0-002-009  09/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1092   Reconstruction               0-002-010  05/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0625   Reconstruction               0-002-012  12/08/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0977   Additions and Alterations    0-002-013  05/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            11-5             -836                  01/10/02   03/25/02    DiGesare Mech.                      
                                                            11-6             -754                  06/14/02   07/10/02    DiGesare Mech.                      
                                                            11-7          -12,735                  02/28/03   03/11/03    DiGesare Mech.                      
                                                            14-3             -633                  02/04/02   03/26/02    Sunrise Elec.                       
                                                            14-4            1,020                  04/05/02   07/21/03    Sunrise Elec.                       
                                                            14-5             -288                  05/30/02   06/05/02    Sunrise Elec.                       
                                                            16-5             -242                  06/14/02   07/10/02    Fisher Hamilton                     
                                                            16-6             -813                  07/03/02   07/12/02    Fisher Hamilton                     
                                                            16-7            7,322                  09/03/02   09/05/02    Fisher Hamilton                     
                                                            16-8           -3,267                  11/28/03   12/05/03    Fisher Hamilton                     
                                                            18-2              300                  02/04/02   03/26/02    Facilities Equip. & Service         
                                                            19-14            -480                  11/30/01   01/28/02    Bast Hatfield                       
                                                            19-15          -1,900                  12/14/01   03/01/02    Bast Hatfield                       
                                                            19-17           6,574                  02/04/02   03/26/02    Bast Hatfield                       
                                                            19-18           5,016                  04/05/02   04/26/02    Bast Hatfield                       
                                                            19-20            -771                  05/15/02   06/04/02    Bast Hatfield                       
                                                            19-21           1,234                  05/30/02   06/05/02    Bast Hatfield                       
                                                            19-22            -381                  06/14/02   06/17/02    Bast Hatfield                       
                                                            19-24            -151                  08/19/02   09/04/02    Bast Hatfield                       
                                                            20-7             -564                  08/19/02   09/04/02    Weisburgh Mech.                     
                                                            22-12         -13,803                  02/04/02   03/26/02    Schenectady Hardware & Elec.        
                                                            22-13           4,420                  02/14/02   03/25/02    Schenectady Hardware & Elec.        
                                                            22-15           7,463                  04/05/02   04/26/02    Schenectady Hardware & Elec.        
                                                            22-16           1,699                  04/05/02   04/26/02    Schenectady Hardware and Elec.      
                                                            22-18           2,807                  05/15/02   06/04/02    Schenectady Hardware and Elec.      
                                                            22-19             483                  06/14/02   07/10/02    Schenectady Hardware and Elec.      
                                                            22-20           2,540                  07/25/02   08/28/02    Schenectady Hardware & Elec.        
                                                            22-22          -3,972                  01/17/03   02/06/03    Schenectady Hardware and Elec.      
 
01-0144   Reconstruction               0-002-014  11/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2MR-1         -14,344                  07/25/02   08/28/02    Quaker Bay                          
                                                            2MR-2               0                  08/19/02   10/28/02    Quaker Bay                          
                                                            2MR-3         -23,470                  02/28/03   03/11/03    Quaker Bay                          
                                                            2MR-4          -1,720                  11/28/03   12/05/03    Quaker Bay                          
 
99-1596   Reconstruction               0-002-015  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0606   Reconstruction               0-002-016  05/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01           8,961                  12/06/11   03/30/12    NIRAM INC                           
                                                            AC-02          10,453                  12/06/11   03/30/12    NIRAM INC                           
                                                            ASB-01         25,005                  12/10/10   02/17/11    NIRAM INC                           
                                                            CC-01         -16,511                  03/13/12   09/06/12    COMALLI GROUP INC                   
                                                            EC-03         -68,436                  09/07/12   06/27/13    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-04R        -77,874                  12/05/12   06/27/13    SCHENECTADY HARDWARE & ELECTRIC     
                                                            PC-01          -6,817                  03/20/12   09/06/12    MAZONE PLUMBING AND HEATING INC     
 
11-0727   Reconstruction               0-002-017  04/16/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -20,000                  11/14/12   03/11/13    Bonacquisti Brotheres & Associates, 
                                                            HC-01          -1,000                  01/02/13   03/11/13    Indoor Air Technologies             
 
12-0330   Reconstruction               0-002-018  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0878   Reconstruction               0-002-019  08/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0922   Reconstruction               0-002-020  08/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -3,413                  09/18/15   11/19/15    J. McBain, Inc.                     
 
14-0293   Reconstruction               0-002-022  09/22/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,042                  12/10/15   01/04/16    J.J. Curran & Son                   
                                                            GC-01          -3,042                  01/12/16   01/29/16    J.J. Curran & Son                   
 
15-1829   Reconstruction               0-002-023  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-04               0                  11/26/18   01/23/19    CAYSEA CONTRACTING CORP.            
                                                            EC-01          17,054                  09/25/17   10/12/17    Schnectady Hardware & Electric Co., 
                                                            EC-06           3,573                  11/26/18   01/09/19    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            EC-08               0                  11/26/18   01/09/19    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            GC-03             520                  01/04/18   01/31/18    BAST HATFIELD                       
                                                            GC-05          28,166                  03/29/18   04/12/18    Bast Hatfield Construction LLC      
                                                            GC-14               0                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            MC-09               0                  11/26/18   01/09/19    T. LEMME MECHANICAL, INC.           
                                                            PC-01          38,307                  09/25/17   10/12/17    Tri-Valley Plumbing and Heating, Inc
                                                            PC-04           4,842                  11/29/18   01/10/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-06               0                  11/26/18   01/09/19    TRI-VALLEY PLUMBING & HEATING, INC. 
 
15-1815   Reconstruction               0-002-024  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1397   Reconstruction               0-002-025  03/10/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0204   Reconstruction               0-002-026  09/18/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          16,676                  03/12/18   03/16/18    Robinson Hall Architectural Products
                                                            GC02           -3,000                  06/11/18   07/03/18    ROBINSON HALL ARCHITECTURAL INC     
                                                            GC03           -4,228                  06/11/18   07/03/18    ROBINSON HALL ARCHITECTURAL INC     
 
18-1107   Reconstruction               0-002-027  03/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            99SC-001      -18,048                  06/17/20   07/23/20    FIELDTURF USA, INC.                 
                                                            EC-001         17,914                  10/16/19   10/18/19    HEWITT YOUNG ELECTRIC, LLC          
                                                            EC-007          1,701                  07/24/20   10/26/20    HEWITT YOUNG ELECTRIC, LLC          
                                                            EC-008          2,046                  07/24/20   10/26/20    HEWITT YOUNG ELECTRIC, LLC          
                                                            SC-001         32,311                  10/29/19   10/30/19    SHAKER FLATS LANDSCAPING, INC.      
                                                            SC-003          6,099                  12/18/20   04/07/21    SHAKER FLATS LANDSCAPING, INC.      
                                                            SC-004         -6,099                  12/18/20   04/07/21    SHAKER FLATS LANDSCAPING, INC.      
 
18-1108   Reconstruction               0-002-028  03/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002         10,025                  12/11/19   12/20/19    HEWITT YOUNG ELECTRIC, LLC          
                                                            EC-003          3,150                  02/28/20   07/02/20    HEWITT YOUNG ELECTRIC, LLC          
                                                            EC-009            544                  11/27/20   02/01/21    HEWITT YOUNG ELECTRIC, LLC          
                                                            GC-001         12,302                  11/14/19   11/22/19    RIVERVIEW CONSTRUCTION ASSOCIATES, I
                                                            GC-002           -514                  11/14/19   11/22/19    RIVERVIEW CONSTRUCTION ASSOCIATES, I
                                                            GC-003             64                  06/17/20   07/24/20    RIVERVIEW CONSTRUCTION ASSOCIATES   
                                                            GC-004          2,532                  06/17/20   07/24/20    RIVERVIEW CONSTRUCTION ASSOCIATES   
                                                            GC-008            717                  06/17/20   07/24/20    RIVERVIEW CONSTRUTCION ASSOCIATES   
                                                            GC-009         -1,125                  06/17/20   07/24/20    RIVERVIEW CONSTRUCTION ASSOCIATES   
                                                            GC2-001           433                  03/18/20   07/10/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC2-002         7,500                  10/22/20   01/08/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            MC-001         10,563                  11/14/19   11/21/19    T. MCELLIGOTT, INC.                 
                                                            MC-002         13,183                  11/14/19   11/21/19    T. MCELLIGOTT, INC.                 
                                                            MC-003         27,036                  11/14/19   11/21/19    T. MCELLIGOTT, INC.                 
                                                            MC-004         -6,852                  03/18/20   07/06/20    T. MCELLIGOTT, INC.                 
                                                            PC-001         33,120                  10/16/19   10/18/19    TRI-VALLEY PLUMBING & HEATING,INC.. 
                                                            PC-002            514                  10/16/19   10/18/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-003          2,275                  10/16/19   10/18/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-005         13,612                  01/03/20   01/21/20    TRI-VALLEY PLUMBING & HEATING INC.  
                                                            PC-008            962                  03/18/20   07/06/20    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-010          1,125                  06/17/20   07/15/20    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            RC-001           -670                  03/18/20   07/10/20    TITAN ROOFING, INC.                 
                                                            SC-002         10,725                  12/27/19   01/22/20    SHAKER FLATS LANDSCAPING, INC.      
                                                            TC-001        -30,000                  12/17/19   01/02/20    BARBER MARKETING INC.               
 
20-0958   Reconstruction               0-002-029  03/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1687   Reconstruction               0-002-030  07/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0972   Reconstruction               0-002-031  06/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-001          5,305                  08/17/23   12/28/23    KIPPER PLUMB & HEAT                 
                                                            SC-002          1,100                  10/05/22   12/15/23    James Maloy Inc                     
 
22-1700   Reconstruction               0-002-032  07/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1004EP Energy Project               0-002-E01  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0221FP Reconstruction               0-002-FP1  10/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lincoln Elementary School:
90-0971   Reconstruction               0-005-003  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1005   Reconstruction               0-005-005  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1034   Additions and Alterations    0-005-007  08/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-19             -554                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-23            6,614                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-28            2,292                  02/28/03   03/13/03    Bast Hatfield                       
                                                            2-29              943                  02/28/03   03/13/03    Bast Hatfield                       
                                                            2-32            1,317                  05/09/03   05/27/03    Bast Hatfield                       
                                                            2-34             -700                  08/18/03   08/27/03    Bast Hatfield                       
                                                            3-5              -422                  08/18/03   08/27/03    Crisafulli Bros.                    
                                                            4-3             4,227                  12/20/02   02/18/03    DiGesare Mech.                      
                                                            5-10rev.        4,942                  10/25/02   02/05/03    Flex Elec.                          
                                                            5-15              941                  10/25/02   02/05/03    Flex Elec.                          
                                                            5-19            1,677                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-23              757                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-26              493                  12/11/02   01/10/03    Flex Elec.                          
                                                            5-31              953                  12/13/02   01/13/03    Flex Elec.                          
 
99-1597   Reconstruction               0-005-008  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1365   Reconstruction               0-005-009  06/15/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          -4,000                  11/01/06   12/18/06    Netrix Inc                          
                                                            AC-02            -875                  11/01/06   12/18/06    Netrix inc                          
 
09-0607   Reconstruction               0-005-010  05/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-02          -8,605                  09/07/12   06/27/13    COMALLI GROUP INC                   
 
12-0332   Reconstruction               0-005-011  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0923   Reconstruction               0-005-012  08/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1830   Reconstruction               0-005-014  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-11               0                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            MC-07               0                  11/26/18   01/23/19    T. LEMME MECHANICAL, INC.           
 
15-1816   Reconstruction               0-005-015  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1109   Reconstruction               0-005-016  03/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-006          1,251                  06/17/20   07/24/20    RIVERVIEW CONSTRUCTION ASSOCIATES   
                                                            GC-007          3,293                  06/17/20   07/24/20    RIVERVIEW CONSTRUCTION ASSOCIATES   
                                                            PC-004         11,625                  10/16/19   10/18/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-009          8,694                  03/18/20   07/06/20    TRI-VALLEY PLUMBING & HEATING, INC. 
 
21-0973   Reconstruction               0-005-017  06/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-004         26,240                  07/21/23   12/18/23    GALLO CONSTRUCTION CORP             
 
94-1006EP Energy Project               0-005-E01  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sacandaga Elementary School:
90-0972   Reconstruction               0-007-004  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1007   Reconstruction               0-007-006  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1091   Reconstruction               0-007-007  05/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1035   Additions and Alterations    0-007-009  08/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-4              -604                  01/17/03   03/12/03    East Coast Haz Mat Removal          
                                                            2-15          -20,933                  11/12/02   03/13/03    Bast Hatfield                       
                                                            2-18            2,083                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-25            2,582                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-33           -2,190                  08/18/03   08/27/03    Bast Hatfield                       
                                                            2-37           -8,900                  01/15/04   01/20/04    Bast Hatfield                       
                                                            2-9a            3,794                  11/14/02   12/02/02    Bast Hatfield                       
                                                            3-3            26,500                  10/17/02   10/28/02    Crisafulli Bros                     
                                                            4-5             4,581                  01/17/03   03/12/03    DiGesare Mech.                      
                                                            4-8            -2,000                  01/15/04   01/20/04    DiGesare Mech.                      
                                                            5-13              593                  10/25/02   02/05/03    Flex Elec.                          
                                                            5-14            1,119                  10/25/02   02/05/03    Flex Elec.                          
                                                            5-18            1,677                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-22            1,110                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-27            5,534                  12/13/02   01/13/03    Flex Elec.                          
                                                            5-30            1,362                  12/13/02   01/13/03    Flex Elec.                          
                                                            5-8             5,797                  09/03/02   10/21/02    Flex Elec.                          
 
99-1598   Reconstruction               0-007-010  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0608   Reconstruction               0-007-011  05/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01         -42,078                  07/08/11   07/28/11    JAMES A EDGAR COMPANY INC           
 
12-0334   Reconstruction               0-007-012  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0924   Reconstruction               0-007-013  08/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1831   Reconstruction               0-007-015  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-07               0                  11/26/18   01/09/19    TRI-VALLEY PLUNBING & HEATING, INC. 
 
15-1817   Reconstruction               0-007-016  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1110   Reconstruction               0-007-017  03/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-006            291                  07/24/20   10/26/20    HEWITT YOUNG ELECTRIC, LLC          
                                                            RC-003         -4,396                  03/18/20   07/10/20    TITAN ROOFING, INC.                 
 
21-0974   Reconstruction               0-007-018  06/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003         13,995                  05/19/23   12/27/23    GALLO CONSTRUCTION CORP             
                                                            MC-001         25,337                  04/19/23   12/27/23    T. McELLIGOTT                       
                                                            MC-002          4,617                  08/29/23   12/18/23    T.MCELLIGOTT                        
                                                            SC-003          4,145                  10/05/22   12/15/23    James Maloy Inc                     
 
03-0222FP Reconstruction               0-007-FP1  10/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
93-0130   Reconstruction               0-009-005  08/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1008   Reconstruction               0-009-006  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1176   Additions and Alterations    0-009-009  06/29/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            19-16            -715                  12/28/01   02/28/02    Bast Hatfield                       
                                                            19-19          27,126                  05/03/02   05/13/02    Bast Hatfield                       
                                                            19-23          13,900                  07/03/02   07/15/02    Bast Hatfield                       
                                                            19-5           -8,200                  09/24/03   09/25/03    Bast Hatfield                       
                                                            19-6         -215,084                  09/24/03   09/25/03    Bast Hatfield                       
                                                            19-7           -4,200                  09/24/03   09/25/03    Bast Hatfield                       
                                                            2-4            -6,000                  09/24/03   09/25/03    August Bohl                         
                                                            2-8            -2,205                  02/04/02   03/21/02    August Bohl                         
                                                            2-9            -2,939                  02/28/03   03/13/03    August Bohl                         
                                                            20-4           -1,200                  10/26/01   02/11/02    Weisburgh Mech.                     
                                                            20-8            6,078                  12/11/02   12/17/02    Weisburgh Mech.                     
                                                            22-11          20,310                  01/10/02   03/18/02    Schenectady Hardware & Elec.        
                                                            22-14           5,120                  04/05/02   05/01/02    Schenectady Hardware & Elec.        
                                                            22-17           1,968                  05/15/02   05/16/02    Schenectady Hardware and Electric   
                                                            22-21             394                  10/25/02   10/28/02    Schenectady Hardware & Elec.        
                                                            22-4           -5,873                  09/24/03   09/25/03    Schenectady Hardware & Electric     
                                                            3-3             5,076                  06/27/01   01/09/02    Schenectady Steel                   
                                                            3-4             4,962                  08/24/01   01/08/02    Schenectady Steel                   
                                                            3-6            -2,049                  01/10/02   03/18/02    Schenectady Steel                   
                                                            3-7            -2,220                  02/14/02   05/28/02    Structural Steel                    
                                                            3-8              -957                  02/14/02   03/21/02    Turner Construction                 
                                                            4-4           -12,029                  07/21/03   07/21/03    William Brown                       
                                                            7-7              -238                  10/25/02   10/28/02    Tougher Industries                  
                                                            7-8R1          -2,843                  02/18/04   02/18/04    Tougher Industries                  
 
99-1599   Reconstruction               0-009-010  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0609   Additions and Alterations    0-009-011  05/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01R        163,044                  05/16/11   07/15/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-02         -16,170                  05/16/11   07/15/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            GC-01         -96,970                  04/24/13   07/16/13    BETTE & CRING LLC                   
 
12-0333   Reconstruction               0-009-012  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0925   Reconstruction               0-009-013  08/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1134   Reconstruction               0-009-015  02/04/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -10,000                  12/20/16   12/28/16    B.B.A., Inc. dba Bonacquisti Brother
                                                            GC-02          -8,837                  12/20/16   12/28/16    B.B.A., Inc. dba Bonacquisti Brother
                                                            GC-03          -1,830                  12/20/16   12/28/16    B.B.A., Inc. dba Bonacquisti Brother
                                                            SC-01         -15,969                  12/21/17   01/29/18    DelSignore Blacktop Paving, Inc.    
                                                            SC-02          -3,000                  01/26/17   01/31/17    DelSignore Blacktop Paving, Inc.    
 
15-1832   Reconstruction               0-009-016  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01            -241                  01/03/18   01/31/18    Caysea Contracting Corp.            
                                                            AA-02          -5,025                  01/19/19   02/06/19    CAYSEA CONTRACTING  CORP.           
                                                            AA-03               0                  11/26/18   01/23/19    CAYSEA CONTRACTING CORP.            
                                                            AA-03               0                  11/26/18   01/23/19    CAYSEA CONTRACTING CORP.            
                                                            EC-02            -241                  01/04/18   01/31/18    SCHENECTADY HARDWARE                
                                                            EC-03           9,348                  01/11/19   02/06/19    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            EC-07            -308                  11/26/18   01/09/19    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            EC-09               0                  11/26/18   01/09/19    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            EC-10           1,028                  11/26/18   01/09/19    SCHENECTADY HAREWARE & ELECTRIC CO. 
                                                            EC-11            -883                  11/26/18   01/09/19    SCHENECTADY HAREWARE & ELECTRIC CO. 
                                                            EC-12          -6,000                  11/26/18   01/09/19    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            GC-01          31,463                  01/04/18   02/05/18    BAST HATFIELD                       
                                                            GC-02            -241                  01/04/18   01/31/18    BAST HATFIELD                       
                                                            GC-04         233,382                  03/29/18   04/12/18    Bast Hatfield Construction LLC      
                                                            GC-08           2,961                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-09            -308                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-13               0                  11/26/18   01/23/19    BAT HATFIELD CONSTRUCTION LLC       
                                                            GC-15            -883                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-16           3,437                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-19          -3,270                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            MC-01          -3,505                  10/30/17   11/30/17    T. Lemme Mechanical, Inc.           
                                                            MC-02          18,406                  10/06/17   11/10/17    T. Lemme Mechanical, Inc.           
                                                            MC-03            -241                  01/04/18   01/31/18    T. LEMME MECHANICAL                 
                                                            MC-04          -9,487                  05/16/18   05/18/18    T.LEMME MECHANICAL, INC.            
                                                            MC-06            -308                  11/26/18   01/23/19    T. LEMME MECHANICAL, INC.           
                                                            MC-10          -6,061                  11/26/18   01/09/19    T. LEMME MECHANICAL, INC.           
                                                            MC-11            -883                  11/26/18   01/09/19    T. LEMME MECHANICAL, INC.           
                                                            PC-02          22,057                  01/04/18   01/31/18    TRI-VALLEY PLUMBING AND HEATING     
                                                            PC-03            -241                  01/04/18   01/31/18    TRI-VALLEY PLUMBING AND HEATING     
                                                            PC-05           5,295                  11/26/18   01/09/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-08            -991                  11/26/18   01/09/19    TRI-VALLEY PLUMBING & HEATING, INC. 
 
15-1818   Reconstruction               0-009-017  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1111   Reconstruction               0-009-018  03/21/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1112   Reconstruction               0-009-019  03/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-004          3,150                  02/28/20   07/02/20    HEWITT YOUNG ELECTRIC, LLC          
                                                            EC-005            294                  06/17/20   07/15/20    HEWITT YOUNG ELECTRIC, LLC          
                                                            GC-005         -2,106                  06/17/20   07/24/20    RIVERVIEW CONSTRUCTION ASSOCIATES   
                                                            PC-006          1,905                  01/03/20   01/21/20    TRI-VALLEY PLUMBING & HEATING INC.  
                                                            RC-002         -1,037                  03/18/20   07/10/20    TITAN ROOFING, INC.                 
 
19-1197   Reconstruction               0-009-020  03/05/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0975   Reconstruction               0-009-021  06/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-001         22,777                  10/05/22   12/15/23    James Maloy Inc                     
                                                            SC2-001         6,415                  08/29/23     /  /      ADIRONDACK LANDSCAPING              
 
22-1701   Reconstruction               0-009-022  07/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1009EP Energy Project               0-009-E01  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0223   Reconstruction               0-009-FP1  10/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Glen-Worden School:
90-0973   Reconstruction               0-017-001  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1010   Reconstruction               0-017-003  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1036   Additions and Alterations    0-017-005  08/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-3            -2,218                  12/13/02   01/13/03    East Coast Haz Mat Removal          
                                                            1-5            -3,810                  02/28/03   03/13/03    East Coast Haz Mat Removal          
                                                            1-6            21,237                  04/11/03   04/18/03    East Coast Haz Mat Removal          
                                                            2-12            1,312                  11/12/02   03/13/03    Bast Hatfield                       
                                                            2-13          -33,934                  11/12/02   03/13/03    Bast Hatfield                       
                                                            2-17            3,629                  12/11/02   01/10/03    Bast Hatfield                       
                                                            2-21              -56                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-22            6,150                  01/17/03   03/12/03    Bast Hatfield                       
                                                            2-26              -26                  02/28/03   03/13/03    Bast Hatfield                       
                                                            2-30            2,838                  02/28/03   03/13/03    Bast Hatfield                       
                                                            2-31              787                  05/09/03   05/21/03    Bast Hatfield                       
                                                            2-9c            1,263                  11/14/02   12/02/02    Bast Hatfield                       
                                                            3-4              -560                  02/28/03   03/13/03    Crisafulli Bros                     
                                                            4-6              -134                  02/28/03   03/13/03    DiGesare Mech.                      
                                                            4-7             2,856                  08/29/03   09/09/03    DiGesare Mech.                      
                                                            5-12            5,022                  10/25/02   02/05/03    Flex Elec.                          
                                                            5-17            1,880                  10/25/02   02/05/03    Flex Elec.                          
                                                            5-20            1,957                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-24              757                  11/12/02   03/13/03    Flex Elec.                          
                                                            5-28            4,342                  12/20/02   02/18/03    Flex Elec.                          
                                                            5-33              954                  12/13/02   01/13/03    Flex Elec.                          
                                                            5-7             6,312                  09/03/02   10/21/02    Flex Elec.                          
 
99-1600   Reconstruction               0-017-006  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0610   Reconstruction               0-017-007  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0335   Reconstruction               0-017-008  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0926   Reconstruction               0-017-009  08/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1833   Reconstruction               0-017-011  11/15/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1819   Reconstruction               0-017-012  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1113   Reconstruction               0-017-013  03/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-007            649                  01/03/20   01/21/20    TRI-VALLEY PLUMBING & HEATING INC.  
 
21-0976   Reconstruction               0-017-014  06/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         16,121                  04/19/23   01/02/24    GALLO CONSTRUCTION CORP             
                                                            GC-002         15,817                  04/19/23   01/02/24    GALLO CONSTRUCTION CORP             
                                                            RC-001        -36,540                  07/21/23   12/18/23    S&L ROOFING & SHEETMETAL            
                                                            SC-004          2,903                  10/05/22   12/15/23    James Maloy Inc                     
 
21-0618   Reconstruction               0-017-015  02/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,286                  10/25/22   06/27/23    Northeast Intr Systems Inc          
                                                            GC-001         -3,141                  10/25/22   12/13/23    Bast Hatfield Const LLC             
                                                            GC-002        -10,388                  02/21/23   12/04/23    BAST HATFIELD CONST LLC             
                                                            GC-003         -1,500                  06/09/23     /  /      BAST HATFIELD CONSTRUCTION          
                                                            MC-001         -6,874                  05/19/23   12/28/23    ECKERT MECHANICAL                   
 
22-0982FC Reconstruction               0-017-016  03/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0853   Reconstruction               0-017-017  01/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Office:
99-1601   Reconstruction               1-006-002  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2089   Reconstruction               1-006-003  05/07/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0611   Reconstruction               1-006-004  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0336   Reconstruction               1-006-005  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1834   Reconstruction               1-006-007  11/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-06           3,489                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-10               0                  11/26/18   01/23/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            RC-01          -8,000                  09/18/17   10/13/17    Henderson-Johnson Co., Inc.         
 
15-1820   Reconstruction               1-006-008  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0977   Reconstruction               1-006-009  06/13/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Salt Storage Building:
09-0612   New Construction             2-041-001  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-0680   Reconstruction               5-008-002  04/20/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1011   Reconstruction               5-008-003  03/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1112   Reconstruction               5-008-004  06/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-10           14,732                  10/25/02   01/07/03    Bast Hatfield                       
                                                            2-36            4,245                  01/15/04   01/20/04    Bast Hatfield                       
                                                            4-2             1,012                  12/11/02   12/13/02    DiGesare Mech.                      
                                                            5-11 rev          571                  10/25/02   01/07/03    Flex Elec.                          
 
99-1602   Reconstruction               5-008-005  08/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0613   Reconstruction               5-008-007  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0337   Reconstruction               5-008-008  06/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1835   Reconstruction               5-008-011  11/15/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1821   Reconstruction               5-008-012  03/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0978   Reconstruction               5-008-013  06/13/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field House:
21-0979   Reconstruction               7-010-002  06/13/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
09-0973   New Construction             7-042-001  05/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fire Pump Building @ Middle School:
16-1185   New Construction             7-045-001  01/28/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
95-0069   Reconstruction               7-999-001  08/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1036   Reconstruction               7-999-003  12/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01          -2,594                  03/14/19   03/21/19    INFRASTRUCTURE, AZONES COMPANY      
 
18-0995   Reconstruction               7-999-004  02/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE

NISKAYUNA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-03-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Van Antwerp Middle School:
91-0379   Additions and Alterations    0-001-001  11/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0412   Reconstruction               0-001-002  12/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1261   Reconstruction               0-001-003  06/15/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1313   Reconstruction               0-001-004  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0867   Reconstruction               0-001-006  04/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0039   Reconstruction               0-001-007  07/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1760   Reconstruction               0-001-010  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0598   Alterations                  0-001-011  04/04/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P71-3-1        -3,362                  03/28/11   04/22/11    PETER LUIZZI & BROS CONTRACTING INC 
                                                            P72-3-1         7,604                  03/28/11   04/22/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-3-2        19,345                  03/28/11   04/22/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-3-3        10,116                  03/28/11   04/22/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-3-4         1,323                  07/11/11   09/09/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-3-5          -345                  08/15/11   08/26/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-3-6         1,153                  10/06/11   12/06/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P74-3-1        10,709                  03/28/11   04/22/11    FAMILY DANZ HEATING & A/C INC       
                                                            P74-3-2        14,206                  04/15/11   05/10/11    FAMILY DANZ HEATING & A/C INC       
                                                            P74-3-3           345                  08/15/11   12/22/11    FAMILY DANZ HEATING & A/C INC       
                                                            P75-3-1           252                  03/28/11   04/22/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            P75-3-2        -6,394                  03/28/11   04/22/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            P75-3-3          -413                  03/28/11   04/22/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            VA-19-4        12,075                  11/13/08   05/15/09    DUTCH VALLEY GENERAL CONTRACTING,INC
                                                            VA-19-8         7,120                  01/23/09   02/26/09    DUTCH VALLEY GENERAL CONTRACTING, IN
                                                            VA19-1         -7,675                  11/23/07   12/14/07    Dutch Valley General Contracting    
                                                            VA19-10        14,524                  09/22/09   10/14/09    DUTCH VALLEY GENERAL CONTRACTING INC
                                                            VA19-11         5,209                  04/30/09   07/29/09    DUTCH VALLEY GENERAL CONTRACTING INC
                                                            VA19-12         5,729                  01/15/10   02/05/10    Dutch Valley General Contracting,Inc
                                                            VA19-13         2,366                  04/30/09   07/29/09    DUTCH VALLEY GENERAL CONTRACTING INC
                                                            VA19-14         5,419             419  12/16/10   04/16/10    DUTCH VALLEY GENERAL CONTRACTING, IN
                                                            VA19-2         32,370                  08/25/08   10/21/08    DUTCH VALLEY GENERAL CONSTRUCTION,  
                                                            VA19-3           -685                  08/25/08   10/21/08    DUTCH VALLEY GENERAL CONTRACTING,INC
                                                            VA19-5         12,690                  09/15/08   05/15/09    DUTCH VALLEY GENERAL CONTRACTING INC
                                                            VA19-6          9,745                  12/08/08   01/22/09    DUTCH VALLEY GENERAL CONTRACTING INC
                                                            VA19-7         16,520                  12/10/08   05/08/09    DUTCH VALLEY GENERAL CONTRACTING, IN
                                                            VA19-9          7,245                  01/23/09   02/26/09    DUTCH VALLEY GENERAL CONTRACTING, IN
                                                            VA20-1         14,329                  08/20/08   11/12/08    MAZONE PLUMBING & HEATING INC.      
                                                            VA20-2         -1,966                  01/30/09   03/17/09    MAZONE PLUMBING & HEATING INC.      
                                                            VA21-1        -50,195                  08/15/11   12/22/11    DIGESARE MECHANICAL                 
                                                            VA22-1           -276                  06/24/08   09/29/08    GROSS ELECTRIC, INC.                
                                                            VA22-2        -27,744                  02/04/11   02/24/11    GROSS ELECTRIC INC                  
                                                            VA22-3          2,009                  02/04/11   02/24/11    GROSS ELECTRIC INC                  
                                                            VA61-1         13,920                  04/08/10   06/23/10    DEBRINO CAULKING ASSOCIATES INC     
                                                            VA61-2         38,681                  08/10/10   11/23/10    DEBRINO CAULKING ASSOCIATES INC     
                                                            VA61-3          6,800                  08/10/10   11/23/10    DEBRINO CAULKING ASSOCIATES INC     
                                                            VA61-4          1,062                  08/19/10   09/13/10    DEBRINO CAULKING ASSOCIATES INC     
 
07-1310   Reconstruction               0-001-012  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-1-1          -290                  02/16/10   04/27/10    ZANDRI CONSTRUCTION CORP.           
                                                            E53-1-2         2,070                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-1-3         3,098                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-1-4         3,968                  05/20/11   06/17/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-1-5        -4,771                  05/20/11   06/17/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-1-6        10,962                  05/20/11   06/17/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-1-7        -7,500                  10/06/11   12/28/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-1-8        14,642                  06/05/12   10/25/12    ZANDRI CONSTRUCTION CORP            
                                                            E55-1-1         1,414                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-1-2         1,039                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-1-3         9,920                  02/16/11   03/14/11    J MCBAIN ELECTRIC INC               
                                                            E55-1-4        -5,169                  02/16/11   03/14/11    J MCBAIN ELECTRIC INC               
 
14-1758   Reconstruction               0-001-013  02/11/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1058   Reconstruction               0-001-014  03/10/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001          1,727                  09/20/17   10/10/17    General Roofing Contractors, LLC.   
                                                            01-002         98,933                  09/20/17   10/10/17    General Roofing Contractors, LLC.   
                                                            01-004          1,684                  09/20/17   10/10/17    General Roofing Contractors, LLC.   
                                                            01-005         13,232                  09/20/17   10/10/17    General Roofing Contractors, LLC.   
                                                            01-006         27,811                  09/20/17   10/10/17    General Roofing Contractors, LLC.   
                                                            01-007          6,086                  09/20/17   10/10/17    General Roofing Contractors, LLC.   
                                                            01-008         24,228                  10/27/17   11/16/17    General Roof Contractors, LLC.      
                                                            01-009          1,770                  10/27/17   11/16/17    General Roofing Contractors, LLC.   
                                                            01-010         -2,965                  12/01/17   12/19/17    General Roofing Contractors, LLC.   
                                                            01-011          2,719                  03/27/18   04/05/18    General Roofing Contractors, LLC    
                                                            02-001          1,774                  09/20/17   10/10/17    Tri-Valley Plumbing & Heating, Inc. 
 
17-0044   Reconstruction               0-001-015  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-013        -10,320                  12/21/18   02/12/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            06-010            440                  11/30/18   01/15/19    FLEX ELECTRIC LLC                   
 
94-1302EP Energy Project               0-001-E01  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0208EP Energy Project               0-001-E02  11/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0443FP Reconstruction               0-001-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-2008SC Visual Structural Inspection 0-001-SC1  06/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Craig Elementary School:
91-1435   Reconstruction               0-002-004  06/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1304   Reconstruction               0-002-005  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0868   Reconstruction               0-002-008  04/23/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            15-021          8,519                  12/07/01   02/28/02    RC Daniel                           
 
96-0003   Reconstruction               0-002-009  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1370   Reconstruction               0-002-010  05/19/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1585   Reconstruction               0-002-011  06/21/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              14,183                  07/11/02   07/15/02    RD McCarthy                         
 
99-1761   Reconstruction               0-002-012  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0599   Additions and Alterations    0-002-013  04/04/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CE15-1         22,150                  11/23/07   12/14/07    Jersen Industries                   
                                                            CE15-10           -85                  02/16/10   04/16/10    JERSEN INDUSTERIES                  
                                                            CE15-2         82,034                  10/06/08   11/10/08    JERSEN INDUSTRIES                   
                                                            CE15-3         33,848                  12/01/08   04/02/09    JERSEN INDUSTRIES                   
                                                            CE15-4         44,311                  12/10/08   06/11/09    JERSEN INDUSTERIES                  
                                                            CE15-5          7,393                  02/27/09   04/23/09    JERSEN INDUSTERIES                  
                                                            CE15-6          8,726                  09/22/09   10/14/09    JERSEN INDUSTRIES                   
                                                            CE15-7          3,780                  04/30/09   07/29/09    JERSEN INDUSTRIES                   
                                                            CE15-8           -895                  07/13/09   08/19/09    JERSEN INDUSTRIES                   
                                                            CE15-9          5,175                  04/30/09   07/29/09    JERSEN INDUSTRIES                   
                                                            CE16-1         12,875                  01/30/09   03/11/09    BURNICHE PIPING, INC. DBA BPI PIPING
                                                            CE17-1        -24,257                  03/29/10   05/28/10    MERIT PLUMBING & HEATING LLC        
                                                            CE18-1         -1,078                  06/02/08   11/06/08    FLEX ELECTRICAL CONSTRUCTORS,INC    
                                                            CE18-2          3,970                  01/23/09     /  /      FLEX ELECTRICAL CONSTRUCTORS, INC.  
                                                            CE18-3          5,816                  01/30/09   03/11/09    FLEX ELECTRICAL CONSTRUCTORS, INC.  
                                                            CE18-4          1,599                  01/30/09   03/11/09    FLEX ELECTRICAL CONSTRUCTORS, INC.  
                                                            P74-1-1           116                  03/28/11   04/22/11    FAMILY DANZ HEATING & A/C INC       
 
07-1311   Reconstruction               0-002-014  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-3-1         3,329                  08/10/10   09/13/10    ZANDRI CONSTRUCTION CORP            
                                                            E53-3-2         1,846                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E55-3-1           429                  02/16/10   05/13/10    J. MCBAIN ELECTRIC, INC.            
                                                            E55-3-2         1,414                  02/04/11   03/03/11    J. MCBAIN INC                       
                                                            E55-3-3           374                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E57-3-1           861                  08/15/11   09/19/11    O'CONNELL ELECTRIC INC              
 
17-0045   Reconstruction               0-002-015  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            03-002          4,115                  10/22/18   11/13/18    Bonacquisti Brothers Construction   
                                                            03-005         29,047                  12/21/18   02/13/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            03-009          9,637                  12/21/18   02/01/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            03-011            756                  12/21/18   02/12/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            03-012         -2,500                  12/21/18   02/12/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            04-001          2,376                  10/22/18   11/13/18    Mazone Plumbing & Heating Inc.      
                                                            04-004            838                  11/30/18   01/15/19    MAZONE PLUMBING & HEATING INC.      
                                                            06-003            884                  10/22/18   11/13/18    Flex Electric LLC                   
                                                            06-004            398                  10/22/18   11/13/18    Flex Electric LLC                   
                                                            06-009            200                  11/30/18   01/15/19    FLEX ELECTRIC LLC                   
                                                            06-013            495                  02/05/19   02/12/19    FLEX ELECTRIC LLC                   
                                                            07-002          1,872                  11/30/18   01/09/19    S&L ROOFING & SHEET METAL           
                                                            07-003         -9,561                  03/01/19   03/13/19    S&L ROOFING & SHEET METAL           
 
18-1577   Reconstruction               0-002-016  03/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            08-001         18,020                  09/26/19   09/30/19    RMB MECHANICAL, INC.                
 
21-1256   Reconstruction               0-002-018  03/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-03               0                  10/03/22   07/27/23    Mc Elligott Inc                     
                                                            MC-07               0                  11/07/22   11/02/23    T. MC ELLIGOT INC                   
                                                            MC-10               0                  01/12/23   11/16/23    T MC ELLIGOTT INC                   
 
94-1305EP Energy Project               0-002-E01  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0209EP Energy Project               0-002-E02  11/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Glencliff Elementary:
94-1312   Reconstruction               0-003-004  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0869   Additions and Alterations    0-003-005  04/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1663   Reconstruction               0-003-006  07/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0004   Reconstruction               0-003-007  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1589   Reconstruction               0-003-008  06/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1762   Reconstruction               0-003-009  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0600   Additions and Alterations    0-003-010  04/04/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GE11-1         29,000                  11/23/07   12/14/07    Jersen Industries                   
                                                            GE11-2         -5,113                  06/02/08   09/29/08    JERSEN INDUSTRIES                   
                                                            GE11-3         74,982                  11/13/08   05/13/09    JERSEN INDUSTRIES                   
                                                            GE11-4         13,973                  02/27/09   06/11/09    Jersen Industries                   
                                                            GE11-5         -4,680                  04/30/09   07/29/09    JERSEN INDUSTRIES                   
                                                            GE11-6           -803                  02/16/10   04/16/10    JERSEN INDUSTERIES                  
                                                            GE12-1          4,295                  10/29/09   12/21/09    BURNICHE PIPING INC (dba BPI PIPING)
                                                            GE12-2          4,231                  04/30/09   08/14/09    BURNICHE PIPING INC                 
                                                            GE13-1        -10,390                  03/29/10   05/28/10    MERIT PLUMBING & HEATING LLC        
                                                            GE14-1         -1,078                  06/02/08   11/06/08    FLEX ELECTRICAL CONSTRUCTORS,INC    
                                                            GE14-2          6,121                  04/30/09   08/14/09    FLEX ELECTRICAL CONSTRUCTORS        
                                                            GE14-3            561                  04/30/09   08/14/09    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            P75-2-1           754                  03/28/11   04/22/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            P75-2-2         2,907                  03/28/11   04/22/11    SCHENECTADY HARDWARE & ELECTRIC CO  
 
07-1312   Additions and Alterations    0-003-011  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-2-1           -90                  02/12/10   04/27/10    ZANDRI CONSTRUCTION CORP.           
                                                            E53-2-2        15,954                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-2-3           -66                  04/15/11   05/10/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-2-4         7,874                  06/05/12   10/25/12    ZANDRI CONSTRUCTION CORP            
                                                            E54-2-1        -1,600                  07/11/11   07/27/11    JOHN V WARREN INC                   
                                                            E55-2-1           762                  02/04/11   03/03/11    J. MCBAIN INC                       
                                                            E55-2-2         1,281                  02/16/11   03/14/11    J MCBAIN ELECTRIC INC               
 
09-1336   Reconstruction               0-003-012  08/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GCS-6-1        23,057                  04/05/10   06/09/10    JABLONSKI EXCAVATING INC            
                                                            GCS-6-2        46,704                  09/22/10   09/30/10    JABLONSKI EXCAVATING INC            
 
11-1382   Reconstruction               0-003-014  12/14/10  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0046   Reconstruction               0-003-015  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06-006            820                  11/30/18   01/15/19    FLEX ELECTRIC LLC                   
 
20-1861   Additions and Alterations    0-003-016  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -2,901                  08/15/22   05/22/23    B&D industries Inc                  
                                                            EC-05           1,275                  01/12/23   11/16/23    B&D INDUSTRIES INC                  
                                                            MC-01               0                  12/23/22   12/11/23    RMB Mech Inc                        
                                                            MC-02         -69,905                  12/23/22   12/11/23    RMB Mech Inc                        
                                                            RC-01               0                  08/08/22   03/28/23    Monahan & Loughlin LLC              
                                                            RC1-02              0                  08/08/22   03/28/23    Monahan&Loughlin LLC                
                                                            RC1-03              0                  12/27/22   12/12/23    Monahan&Loughlin LLC                
                                                            RC1-04              0                  12/27/22   12/12/23    Monahan&Loughlin LLC                
 
21-1257   Reconstruction               0-003-017  03/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01               0                  10/03/22   07/27/23    MC Elligott Inc                     
 
94-1308EP Energy Project               0-003-E01  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rosendale Elementary:
91-1436   Reconstruction               0-004-004  06/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1314   Reconstruction               0-004-005  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0870   Reconstruction               0-004-007  04/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0008   Reconstruction               0-004-008  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1588   Reconstruction               0-004-009  06/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1763   Reconstruction               0-004-010  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0780   Additions and Alterations    0-004-011  05/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            IR59-1        -35,455                  04/24/09   07/29/09    ATLANTIC CONTRACTING & SPECIALTIES  
                                                            IR59-2          3,358                  12/28/09   05/10/10    ATLANTIC CONTRACTING & SPECIALTIES  
                                                            IR59-3          5,394                  12/28/09   05/10/10    ATLANTIC CONTRACTING & SPECIALTIES  
                                                            IR59-4         -1,600                  12/28/09   05/10/10    ATLANTIC CONTRACTING & SPECIALTIES  
                                                            IR59-5         -1,961                  08/10/10   11/12/10    ATLANTIC CONTRACTING & SPECIALTIES  
                                                            P75-4-1           118                  03/28/11   04/22/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            RE36-1         -5,335                  02/27/09   05/05/09    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            RE36-10         5,275                  04/05/10   06/16/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            RE36-11        -1,106                  08/10/10   11/12/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            RE36-2         -5,445                  04/24/09   07/29/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            RE36-3         -1,908                  04/24/09   07/29/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            RE36-4         12,505                  11/05/09   02/05/10    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            RE36-5          9,667                  02/16/10   05/28/10    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            RE36-6          4,110                  02/16/10   05/28/10    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            RE36-7         10,866                  02/16/10   05/28/10    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            RE36-8         16,542                  03/29/10   05/28/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            RE36-9          8,612                  04/05/10   06/16/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            RE37-1          2,437                  04/28/09   07/17/09    CRISAFULLI BROTHERS INC             
                                                            RE37-2          1,488                  07/13/09   08/25/09    CRISAFULLI BROTHERS INC             
                                                            RE37-3          1,513                  07/13/09   08/25/09    CRISAFULLI BROTHERS INC             
                                                            RE37-4         28,000                  10/08/09   11/17/09    CRISAFULLI BROTHERS INC             
                                                            RE37-5          3,928                  10/08/09   11/17/09    CRISAFULLI BROTHERS INC             
                                                            RE37-6          4,525                  12/10/09   03/25/11    CRISAFULLI BROTHERS INC             
                                                            RE37-7          2,272                  02/16/10   05/28/10    CRISAFULLI BROTHERS, INC.           
                                                            RE37-8          1,914                  02/16/10   05/28/10    CRISAFULLI BORTHERS, INC.           
                                                            RE39-1           -392                  10/08/09   11/17/09    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            RE39-2         -1,295                  08/19/10   11/23/10    SCHENECTADY HARDWARE & ELECTRIC CO  
 
07-1313   Reconstruction               0-004-012  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-6-1           -90                  02/16/10   04/27/10    ZANDRI CONSTRUCTION CORP.           
                                                            E53-6-2         9,312                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-6-2         4,509                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-6-4           574                  04/15/11   05/10/11    ZANDRI CONSTRUCTION CORP            
                                                            E54-6-1        -3,300                  05/20/11   06/17/11    JOHN V WARREN INC                   
                                                            E55-6-1           620                  02/16/10   04/27/10    J. MCBAIN ELECTRIC, INC.            
                                                            E55-6-2         3,520                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-6-3         6,006                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
 
17-0047   Reconstruction               0-004-013  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06-005            850                  11/30/18   01/15/19    FLEX ELECTRIC LLC                   
 
20-1862   Additions and Alterations    0-004-014  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02               0                  08/29/22   04/20/23    B&D Industries Inc                  
                                                            EC-04          -2,964                  11/07/22   11/02/23    B&D INDUSTRIES INC                  
                                                            MC-03         -70,110                  12/23/22   12/11/23    RMB Mech Inc                        
                                                            MC-05           8,925                  12/27/22   12/14/23    RMB Mech Inc                        
                                                            RC1-06         -4,563                  05/22/23   12/27/23    MONAHAN & LOUGHLIN                  
 
21-1585   Reconstruction               0-004-015  08/04/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-05               0                  07/31/23   01/09/24    HMA CONTRACTING CORP                
 
94-1307EP Energy Project               0-004-E01  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0445FP Reconstruction               0-004-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
91-0705   Reconstruction               0-006-009  02/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1437   Reconstruction               0-006-010  06/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1607   Reconstruction               0-006-011  06/29/94  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            15-020          1,272                  12/07/01   05/29/02    RC Daniel                           
 
98-0368   Reconstruction               0-006-012  11/12/98  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0065   Reconstruction               0-006-013  08/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1660   Reconstruction               0-006-014  07/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0010   Reconstruction               0-006-015  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1347   Additions and Alterations    0-006-017  09/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,593                  05/28/03   06/02/03    John V. Warren                      
 
99-1583   Reconstruction               0-006-018  06/21/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,590                  08/20/02   10/28/02    MLB Industries                      
 
99-1766   Reconstruction               0-006-020  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0527   Alterations                  0-006-021  03/25/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H125-21       -58,675                  08/15/11   08/26/11    LECHASE CONSTRUCTION SERVICES       
                                                            H127-11       -24,580                  08/15/11   12/22/11    COLLETT MECHANICAL INC              
                                                            H127-13       -71,835                  08/15/11   12/22/11    COLLETT MECHANICAL INC              
                                                            H230-1         28,285                  11/13/08   01/16/09    FOUR STRONG BUILDERS                
                                                            H230-10        14,750                  12/29/10   02/07/11    FOUR STRONG BUILDERS                
                                                            H230-11        32,270                  12/29/10   02/07/11    FOUR STRONG BUILDERS                
                                                            H230-12        10,166                  08/10/10   09/10/10    FOUR STRONG BUILDERS                
                                                            H230-13        24,000                  02/07/11   03/08/11    FOUR STRONG BUILDERS                
                                                            H230-14        14,075                  02/07/11   03/08/11    FOUR STRONG BUILDERS                
                                                            H230-15        14,525                  08/15/11   08/26/11    FOUR STRONG BUILDERS                
                                                            H230-2        111,300                  01/30/09   03/05/09    FOUR STRONG BUILDERS                
                                                            H230-3         19,000                  10/08/09   10/30/09    FOUR STRONG BUILDERS                
                                                            H230-4        -17,650                  10/08/09   10/30/09    FOUR STRONG BUILDERS                
                                                            H230-5          8,025                  10/08/09   10/30/09    FOUR STRONG BUILDERS                
                                                            H230-6          3,835                  04/08/10   06/23/10    FOUR STRONG BUILDERS                
                                                            H230-7         14,965                  04/08/10   06/23/10    FOUR STRONG BUILDERS                
                                                            H230-8         10,445                  04/08/10   06/23/10    FOUR STRONG BUILDERS                
                                                            H230-9         23,800                  04/08/10   06/23/10    FOUR STRONG BUILDERS                
                                                            H231-1         -1,573                  04/24/09   07/29/09    ANDREW R. MANCINI ASSOCIATES INC    
                                                            H231-10        -1,216                  08/19/10   09/14/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-11       -28,168                  08/26/10   09/14/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-12         8,341                  08/18/19   09/14/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-13         5,443                  11/05/10   12/13/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-14         6,189                  11/05/10   12/13/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-15        11,833                  02/07/11   03/08/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-16        16,363                  02/07/11   03/08/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-17         7,667                  02/07/11   03/08/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-18         8,906                  02/07/11   03/08/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-19         2,990                  02/07/11   03/08/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-2         -1,376                  04/24/09   07/29/09    ANDREW R. MANCINI ASSOCIATES INC    
                                                            H231-20         5,291                  02/16/11   03/03/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-21        35,933                  02/16/11   03/03/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-22         5,333                  02/16/11   03/03/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-23         2,835                  02/16/11   03/03/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-24        20,077                  08/15/11   08/26/11    ANDREW R. MANCINI ASSOC INC         
                                                            H231-25         2,391                  08/15/11   08/26/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-26        10,711                  05/20/11   06/09/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-27        -4,790                  08/15/11   08/26/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-28         2,952                  08/15/11   08/26/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-29        -1,115                  08/15/11   08/26/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-3           -675                  07/22/09   08/24/09    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-30           908                  08/15/11   08/26/11    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-4         -2,300                  10/08/09   10/30/09    ANDREW R. MANCINI ASSOCIATES INC    
                                                            H231-5         -1,788                  04/05/10   06/14/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-6         -2,539                  04/05/10   06/14/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-7          2,500                  08/10/10   09/10/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-8        -12,264                  08/10/10   10/28/19    ANDREW R MANCINI ASSOCIATES INC     
                                                            H231-9          1,133                  08/19/10   09/14/10    ANDREW R MANCINI ASSOCIATES INC     
                                                            H232-6        -18,825                  10/06/11   12/06/11    WB ROOFING & SHEETMETAL INC         
                                                            H232-7         -4,225                  10/06/11   12/06/11    WB ROOFING & SHEETMETAL INC         
                                                            H233-1         82,000                  01/23/09     /  /      BURNICE PIPING, INC. DBA BPI PIPING 
                                                            H233-10         6,827                  08/20/10   09/10/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-11         6,670                  02/07/11   03/08/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-12        12,079                  04/15/11   05/19/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-13         9,835                  04/15/11   05/19/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-14         1,891                  04/15/11   05/19/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-2         -7,830                  07/13/09   11/12/09    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-3         24,889                  10/08/09   10/30/09    BURNICHE PIPING INC (dba BPI PIPING)
                                                            H233-4         13,638                  04/05/10   06/14/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-5          1,408                  04/05/10   06/14/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-6          4,619                  08/10/10   09/10/10    BURNICHE PIPING INC (dba BPI PIPING)
                                                            H233-7         21,676                  08/10/10   09/10/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-8          7,187                  08/20/10   09/10/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H233-9          8,250                  08/20/10   09/10/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H234-1        109,700                  01/23/09     /  /      CAMPITO PLUMBING & HEATING, INC.    
                                                            H234-10         2,862                  08/20/10   09/10/10    CAMPITO PLUMBING & HEATING INC      
                                                            H234-11        -5,356                  02/07/11   03/08/11    CAMPITO PLUMBING & HEATING INC      
                                                            H234-12        -6,669                  02/07/11   05/04/11    CAMPITO PLUMBING & HEATING INC      
                                                            H234-13         1,543                  02/16/11   03/14/11    CAMPITO PLUMBING & HEATING INC      
                                                            H234-14        58,945                  02/16/11   03/14/11    CAMPITO PLUMBING & HEATING INC      
                                                            H234-15        -1,427                  02/16/11   03/14/11    CAMPITO PLUMBING & HEATING INC      
                                                            H234-16        -1,970                  04/15/11   05/10/11    CAMPITO PLUMBING & HEATING INC      
                                                            H234-17         2,671                  05/20/11   06/09/11    CAMPITO PLUMBING & HEATING INC      
                                                            H234-18         1,460                  10/06/11   08/06/12    CAMPITO PLUMBING & HEATING INC      
                                                            H234-2        -63,275                  01/23/09     /  /      CAMPITO PLUMBING & HEATING, INC.    
                                                            H234-3           -263                  02/16/10   04/27/10    CAMPITO PLUMBING & HEATING, INC.    
                                                            H234-4           -224                  03/15/10   04/30/10    CAMPITO PLUMBING & HEATING INC      
                                                            H234-5          1,788                  04/08/10   06/23/10    CAMPITO PLUMBING & HEATING INC      
                                                            H234-7         -5,961                  08/10/10   06/19/19    CAMPITO PLUMBING & HEATING INC      
                                                            H234-8           -762                  08/20/10     /  /      CAMPITO PLUMBING & HEATING INC      
                                                            H234-9         49,700                  08/20/10   09/10/10    CAMPITO PLUMBING & HEATING INC      
                                                            H235-1        109,332                  01/23/09   02/26/09    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            H235-10          -349                  02/16/11   03/14/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-11         5,176                  04/15/11   05/10/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-12         7,222                  04/15/11   05/10/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-13         2,038                  05/20/11   06/09/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-14        11,098                  05/20/11   06/09/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-15        14,921                  05/20/11   06/09/11    SCENECTADY HARDWARE & ELECTRIC CO   
                                                            H235-16        13,419                  05/20/11   06/08/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-17        -4,140                  08/15/11   12/22/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-2         -4,573                  01/23/09     /  /      SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            H235-3          1,131                  04/08/10   06/23/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-4          3,471                  08/20/10   09/10/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-5         -1,309                  08/20/10   09/10/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-6          6,673                  02/07/11   03/08/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-7          7,982                  02/07/11   03/08/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-8          1,352                  02/16/11   03/14/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            H235-9         20,688                  02/16/11   03/14/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            P71-7-1       -12,275                  04/15/11   05/10/11    PETER LUIZZI & BROS CONTRACTING INC 
                                                            P71-7-2       -29,566                  03/11/11     /  /      PETER LUIZZI & BROS CONTRACTING INC 
                                                            P72-8-1          -674                  03/11/11   05/13/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-8-2        -4,230                  03/11/11   05/13/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P73-6-1           569                  03/11/11   05/13/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            P74-7-1           345                  08/15/11   12/22/11    FAMILY DANZ HEATING & A/C INC       
                                                            P75-7-1        -2,500                  03/11/11   05/13/11    SCHENECTADY HARDWARE & ELECTRIC CO  
 
05-0521   Reconstruction               0-006-022  12/20/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0695   Additions and Alterations    0-006-023  05/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H123-1         20,500                  04/21/08   08/06/08    EXCEL INSULATION CO., INC.          
                                                            H123-3        -21,208                  08/25/08   10/07/08    EXCEL INSULATION CO., INC.          
                                                            H123-4        -24,000                  11/13/08   05/15/09    EXCEL INSULATION CO., INC.          
                                                            H124-10          -462                  01/30/09   04/07/09    JAMES H. MALOY, INC.                
                                                            H124-11         8,891                  01/30/09   03/03/09    JAMES H. MALOY, INC.                
                                                            H124-12        43,384                  09/22/09   10/14/09    JAMES H MALOY INC                   
                                                            H124-13        15,900                  04/29/09   07/29/09    JAMES H. MALOY INC                  
                                                            H124-14        15,929                  04/29/09   07/29/09    JAMES H. MALOY INC                  
                                                            H124-15        28,551                  07/13/09   08/19/09    JAMES H MALOY INC                   
                                                            H124-16         7,005                  10/08/09   11/17/09    JAMES H. MALOY INC                  
                                                            H124-17         7,985                  11/05/09   01/15/10    JAMES H. MALOY, INC.                
                                                            H124-18         8,860                  11/05/10   11/12/10    JAMES H MALOY INC                   
                                                            H124-19        23,792                  11/05/10   11/12/10    JAMES H MALOY INC                   
                                                            H124-2         96,000                  04/21/08   08/06/08    JAMES H. MALOY, INC.                
                                                            H124-20         5,873                  03/15/10   04/30/10    JAMES H MALOY INC                   
                                                            H124-21        28,049                  11/05/10   11/12/10    JAMES H MALOY INC                   
                                                            H124-22         4,105                  11/05/10   12/13/10    JAMES H MALOY INC                   
                                                            H124-23        26,943                  11/05/10   12/13/10    JAMES H MALOY INC                   
                                                            H124-24       -39,962                  08/10/10   09/13/10    JAMES H MALOY INC                   
                                                            H124-25        -2,766                  08/19/10   09/13/10    JAMES H MALOY INC                   
                                                            H124-26         2,604                  02/04/11   02/24/11    JAMES H MALOY INC                   
                                                            H124-27         1,994                  04/15/11   05/10/11    JAMES H MALOY INC                   
                                                            H124-4        -37,589                  06/24/08   09/29/08    JAMES H MALOY                       
                                                            H124-5        -20,500                  08/25/08   10/07/08    JAMES H. MALOY, INC.                
                                                            H124-6        217,558                  11/21/08   02/13/09    JAMES H. MALOY                      
                                                            H124-7         14,320                  10/06/08   11/10/08    JAMES H. MALOY, INC.                
                                                            H124-8         40,839                  12/10/08   02/27/09    JAMES H. MALOY, INC.                
                                                            H124-9         12,935                  01/23/09   03/02/09    JAMES H. MALOY, INC.                
                                                            H125-1         -4,500                  04/21/08   08/06/08    LECHASE CONSTRUCTION SERVICES       
                                                            H125-10        -1,343                  09/24/09   10/08/09    LECHASE CONSTRUCTION SERVICES       
                                                            H125-11        -2,390                  03/15/10   04/30/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-12        -1,288                  03/15/10   04/30/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-13          -474                  03/15/10   04/30/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-14        -3,374                  04/08/10   06/16/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-15        -5,366                  08/10/10   09/10/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-16         6,480                  08/10/10   09/10/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-17        -2,500                  08/10/10   09/10/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-18         9,978                  08/10/10   09/10/10    LECHASE CONSTRUCTION SERVICES       
                                                            H125-19        -2,378                  08/30/11   09/09/11    LECHASE CONSTRUCTION SERVICES       
                                                            H125-2           -922                  06/24/08   09/29/08    LECHASE CONSTRUCTION                
                                                            H125-20         6,801                  08/30/11   09/09/11    LECHASE CONSTRUCTION SERVICES       
                                                            H125-3              0                  09/24/09   10/08/09    LECHASE CONSTRUCTION SERVICES       
                                                            H125-4         -1,163                  09/24/09   10/08/09    LECHASE CONSTRUCTION SERVICES       
                                                            H125-5         -3,662                  09/24/09   12/23/09    LECHASE CONSTRUCTION SERVICES       
                                                            H125-6         -1,325                  09/24/09   10/08/09    LECHASE CONSTRUCTION SERVICES       
                                                            H125-7         -2,500                  09/24/09   10/08/09    LECHASE CONSTRUCTION SERVICES       
                                                            H125-8         -1,544                  10/08/09   11/17/09    LECHASE CONSTRUCTION SERVICES       
                                                            H125-9         -4,955                  09/24/09   10/08/09    LECHASE CONSTRUCTION SERVICES       
                                                            H126-10         2,125                  07/22/09   09/01/09    BURNICHE PIPING INC dba BPI PIPING  
                                                            H126-11         4,694                  10/08/09   11/17/09    BURNICHE PIPING INC (dba BPI PIPING)
                                                            H126-12         8,280                  02/16/10     /  /      BURNICHE PIPING, INC.               
                                                            H126-13         3,569                  03/15/10   04/30/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H126-14          -461                  04/08/10   06/16/10    BURNICHE PIPING INC dba BPI PIPING  
                                                            H126-2         30,045                  11/21/08     /  /      BURNICHE PIPING, INC.               
                                                            H126-3          5,651                  01/23/09     /  /      BURNICHE PIPING, INC DBA BPI PIPING 
                                                            H126-4         19,842                  01/30/09   03/17/09    BURNICHE PIPING, INC. DBA BPI PIPING
                                                            H126-5          4,120                  01/30/09   03/17/09    BURNICHE PIPING, INC. DBA BPI PIPING
                                                            H126-6          3,873                  01/30/09   03/17/09    BURNICHE PIPING, INC. DBA BPI PIPING
                                                            H126-7          1,733                  04/29/09   09/23/09    BURNICHE PIPING INC                 
                                                            H126-8           -239                  04/29/09   09/23/09    BURNICHE PIPING INC                 
                                                            H126-9          2,406                  07/22/09   09/01/09    BURNICHE PIPING INC dba BPI PIPING  
                                                            H127-10        -2,862                  02/04/11   02/24/11    COLLETT MECHANICAL INC              
                                                            H127-12        -1,455                  08/15/11   09/09/11    COLLETT MECHANICAL INC              
                                                            H127-2         -1,500                  10/08/09   11/17/09    COLLETT MECHANICAL INC              
                                                            H127-3         -2,454                  10/08/09   11/17/09    COLLETT MECHANICAL INC              
                                                            H127-4           -427                  02/02/12   09/19/12    COLLETT MECHANICAL INC              
                                                            H127-5           -707                  10/08/09   11/17/09    COLLETT MECHANICAL INC              
                                                            H127-6             59                  10/08/09   10/30/09    COLLETT MECHANICAL INC              
                                                            H127-7         -1,140                  11/05/10   11/12/10    COLLETT MECHANICAL INC              
                                                            H127-8           -642                  11/05/10   11/12/10    COLLETT MECHANICAL INC              
                                                            H127-9           -331                  11/05/10   11/10/10    COLLETT MECHANICAL INC              
                                                            H128-2        -55,800                  04/29/09   09/23/09    AQUIFER DRILLING AND TESTING INC    
                                                            H129-1         -2,048                  04/21/08   08/06/08    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            H129-10         9,208                  12/08/08   07/28/09    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            H129-11         6,337                  01/23/09     /  /      SH&E                                
                                                            H129-12         3,199                  01/23/09     /  /      SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-13         1,167                  02/27/09   06/10/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-14        -7,608                  04/29/09   09/23/09    SCHENECTADY HARDWARE AND ELECTRIC   
                                                            H129-15       -27,351                  04/29/09   09/23/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-16           897                  04/29/09   09/23/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-17        -4,419                  04/29/09   09/23/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-18         1,278                  04/29/09   09/23/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-19        17,841                  01/15/10   02/05/10    Schenectady Hardware and Electric   
                                                            H129-20         8,471                  09/24/09   10/08/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-21        16,439                  09/24/09   10/21/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-22         1,228                  04/02/12   07/05/13    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-23         4,678                  10/08/09   10/30/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-24         2,005                  10/08/09   10/30/09    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-25         4,788                  12/10/09   01/21/10    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-26         4,606                  02/16/10   05/26/10    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-27          -331                  03/15/10   04/30/10    SCHENECTADY HARDWARE & ELECTRIC     
                                                            H129-3        -17,875                  06/19/08   02/11/09    Schenectady Hardware & Electric     
                                                            H129-4         -1,710                  08/29/08     /  /      SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            H129-5            765                  08/25/08   10/07/08    SCHENECTADY HARDWARE & ELECTRIC CO.,
                                                            H129-6         -1,378                  08/18/08   11/12/08    SCHENECTADY HARDWWARE & ELECTRIC CO.
                                                            H129-7          9,513                  11/13/08   07/27/09    SCHNECTADY HARDWARE & ELECTRIC CO.  
                                                            H129-8          6,699                  11/13/08   07/27/09    SCHENECTADY & ELECTRIC CO. INC.     
                                                            H129-9            674                  11/13/08   07/27/09    SCHENECTADY HARDWARE & ELECTRIC CO. 
                                                            H170-1          1,798                  02/20/08   03/08/08    A&L SPECIALTIES, INC.               
                                                            H171-1         -8,003                  06/02/08   11/06/08    T.LEMME MECHANICAL, INC             
                                                            H172-1        -14,340                  02/20/08   03/19/08    Justin Electrical                   
                                                            H173-1         28,757                  02/20/08   02/23/08    Hoosick Valley contractors          
                                                            H173-2          6,822                  02/20/08   02/23/08    Hoosick Valley contractors          
                                                            H173-3         25,000                  02/20/08   02/23/08    Hoosick Valley contractors          
                                                            H174-1          4,957                  02/20/08     /  /      Family Danz Heating & A/C           
                                                            H175-1          3,269                  11/23/07   01/28/08    George J. Martin & son inc          
                                                            H175-2         50,068                  11/13/08   07/28/09    GEORGE J. MARTIN & SONS, INC.       
                                                            H232-1              0                  07/22/09   09/23/09    WB ROOFING & SHEETMETAL INC         
                                                            H232-2        -10,443                  07/22/09   08/21/09    WB ROOFING & SHEETMETAL INC         
                                                            H232-3        -18,806                  02/07/11   03/01/11    WB ROOFING & SHEETMETAL INC         
                                                            H232-4           -660                  02/07/11   03/01/11    WB ROOFING & SHEETMETAL INC         
                                                            H232-5         -2,567                  02/07/11   03/01/11    WB ROOFING & SHEETMETAL INC         
                                                            H234-6           -621                  12/29/10   02/07/11    CAMPITO PLUMBING & HEATING INC      
 
07-1314   Reconstruction               0-006-024  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-4-1          -600                  08/10/10   09/10/10    ZANDRI CONSTRUCTION CORP            
                                                            E53-4-2        -2,023                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E55-4-1         5,717                  02/16/10   04/27/10    J. MCBAIN ELECTRIC, INC.            
                                                            E55-4-2         1,886                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-4-3            17                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-4-4        -2,841                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-4-5         1,392                  02/16/11   03/14/11    J MCBAIN ELECTRIC INC               
                                                            E57-4-1        25,558                  02/04/11   03/03/11    O'CONNELL ELECTRIC INC              
 
07-2343   Reconstruction               0-006-025  08/01/07  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0048   Reconstruction               0-006-026  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-001          2,058                  10/22/18   11/13/18    Bonacquisti Brothers Construction   
                                                            03-004          5,423                  10/22/18   11/13/18    Bonacquisti Brothers Construction   
                                                            03-006          5,412                  12/21/18   02/12/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            03-010          2,423                  12/21/18   02/01/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            03-014            595                  12/11/08   02/12/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            03-015            845                  03/01/19   03/13/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            03-016          1,557                  03/01/19   03/13/19    BONACQUISTI BROTHERS CONSTRUCTION   
                                                            05-001          5,719                  10/22/18   11/13/18    RMB Mechanical, Inc.                
                                                            05-002          5,646                  10/22/18   11/13/18    RMB Mechanical, Inc.                
                                                            05-003          1,933                  10/22/18   11/13/18    RMB Mechanical, Inc.                
                                                            05-004          7,519                  10/23/18   11/13/18    RMB Mechanical, Inc.                
                                                            05-005          9,836                  03/01/19   03/07/19    RMB MECHANICAL,INC.                 
                                                            06-001         10,346                  10/22/18   11/13/18    Flex Electric LLC                   
                                                            06-002          8,800                  10/22/18   11/13/18    Flex Electric LLC                   
                                                            06-012          9,432                  12/21/18   02/01/19    FLEX ELECTRIC LLC                   
                                                            06-014            529                  12/21/18   02/01/19    FLEX ELECTRIC LLC                   
 
20-1863   Additions and Alterations    0-006-029  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           3,716                  11/07/22   11/02/23    B&D INDUSTRIES INC.                 
                                                            MC-04           1,103                  12/27/22   12/14/23    RMB Mech Inc                        
                                                            MC-06           2,003                  02/21/23   12/04/23    RMB MECH INC                        
                                                            RC1-05              0                  02/21/23   12/15/23    MONAHAN & LOUGHLIN LLC              
                                                            RC1-07              0                  06/14/23   12/18/23    MONANHAN & LOUGHLIN                 
                                                            RC1-08        -47,480                  06/14/23     /  /      MONAHAN & LOUGHLIN                  
 
21-0245   Reconstruction               0-006-030  11/05/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01           1,026                  03/20/23   12/19/23    MJ'S CONTRACTING SERVICES           
                                                            EC-01               0                  02/21/23   12/04/23    CKM ELEC SERVICES INC               
                                                            EC-02               0                  07/17/23   12/28/23    CKM ELECTRICAL SERVICES             
                                                            EC-03               0                  07/17/23   12/28/23    CKM ELECTRICAL SERVICES             
                                                            EC-04               0                  08/14/23   12/29/23    CKM ELECTRICAL SERVICES             
                                                            GC-01               0                  09/06/22   06/29/23    PCC Contracting Inc                 
                                                            GC-02          18,600                  11/07/22   06/29/23    PCC CONTRACTING INC.                
                                                            GC-03               0                  06/14/23   12/18/23    PCC CONTRACTING                     
                                                            GC-04          -4,170                  06/14/23   12/18/23    PCC CONTRACTING                     
                                                            SC-01               0                  09/06/22   06/29/23    Shaker Flats Landscpg Inc           
                                                            SC-02               0                  09/06/22   06/29/23    Shaker Flats Landscape Inc          
                                                            SC-03               0                  09/06/22   06/29/23    Shaker Flats Landscape Inc          
                                                            SC-04               0                  09/06/22   06/29/23    Shaker Flats Landscaping Inc        
                                                            SC-05               0                  09/06/22   06/29/23    Shaker Flats Landscaping Inc        
                                                            SC-06               0                  12/23/22   12/12/23    Shaker Flats Landscaping Inc        
                                                            SC-07          10,315                  12/23/22   12/12/23    Shaker Flats Landscaping Inc        
                                                            SC-09               0                  12/23/22   12/12/23    Shaker Flats Landscaping Inc        
                                                            SC-10               0                  12/23/22   12/12/23    Shaker Flats Landscaping Inc        
                                                            SC-11               0                  12/23/22   12/12/23    Shaker Flats Landscaping Inc        
                                                            SC-12               0                  12/23/22   12/12/23    Shaker Flats Landscaping Inc        
                                                            SC-13               0                  03/20/23   12/19/23    SHAKER FLATS LANDSCAPING            
                                                            SC-14               0                  03/20/23   12/19/23    SHAKER FLATS LANDSCAPING            
                                                            SC-15               0          12,700  05/01/23     /  /      SHAKER FLATS LANDSCAPING            
                                                            SC-16               0                  05/01/23   12/28/23    SHAKER FLATS LANDSCAPING            
                                                            SC-17               0                  05/22/23   12/27/23    SHAKER FLATS LANDSCAPING            
                                                            SC-18               0                  05/22/23   12/27/23    SHAKER FLATS LANDSCAPING            
                                                            SC-19               0                  06/22/23     /  /      SHAKER FLATS LANDSCAPING            
                                                            SC-20               0                  08/09/23   12/22/23    SHAKER FLATS LANDSCAPING            
                                                            SC-21          21,172                  08/09/23     /  /      SHAKER FLATS LANDSCAPING            
                                                            SC-21               0                  08/21/23   12/22/23    SHAKER FLATS LANDSCAPING            
                                                            SC-22          24,904          24,904  08/09/23   12/22/23    SHAKER FLATS LANDSCAPING            
                                                            SC-23               0                  08/14/23   12/22/23    SHAKER FLATS LANDSCAPING            
                                                            SC-24               0                  08/14/23   12/22/23    SHAKER FLATS LANDSCAPING            
                                                            WC-002         -8,000                  03/20/23   12/19/23    NEP GLASS CO                        
 
21-1258   Reconstruction               0-006-031  03/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-04               0                  10/03/22   07/27/23    Mc Elligott Inc                     
                                                            MC-05               0                  10/03/22   08/08/23    Mc Elligott Inc                     
                                                            MC-11               0                  02/21/23   12/04/23    T MC ELLIGOTT INC                   
                                                            MC-12           6,213                  02/21/23   12/04/23    T MC ELLIGOTT INC                   
                                                            MC-14           5,484                  05/09/23   12/29/23    T. MC ELLIGOTT                      
                                                            MC-15           3,462                  05/09/23   12/22/23    T. MC ELLIGOTT                      
                                                            MC-16               0                  07/31/23   12/27/23    T. MC ELLIGOTT INC                  
 
00-2009SC Visual Structural Inspection 0-006-SC1  06/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hillside Elementary:
91-0706   Reconstruction               0-007-003  02/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1438   Reconstruction               0-007-004  06/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1303   Reconstruction               0-007-005  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0871   Reconstruction               0-007-007  04/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0006   Reconstruction               0-007-008  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1587   Reconstruction               0-007-009  06/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1764   Reconstruction               0-007-010  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0782   Additions and Alterations    0-007-011  05/09/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HE-44-13        9,530                  12/27/11   08/22/12    Jersen Industries                   
                                                            HE44-1         -7,398                  04/29/09   07/29/09    JERSEN INDUSTRIES                   
                                                            HE44-10         2,333                  08/10/10   11/12/10    JERSEN INDUSTRIES                   
                                                            HE44-11         1,772                  08/10/10   11/12/10    JERSEN INDUSTRIES                   
                                                            HE44-12        24,937                  02/04/11   02/24/11    JERSEN INDUSTRIES                   
                                                            HE44-14         7,550                  06/05/12   10/23/12    JERSEN INDUSTRIES                   
                                                            HE44-2         19,893                  10/08/09   11/17/09    JERSEN INDUSTRIES                   
                                                            HE44-3         29,519                  02/16/10   05/26/10    JERSEN INDUSTRIES                   
                                                            HE44-4          3,343                  02/16/10   05/26/10    JERSEN INDUSTRIES                   
                                                            HE44-5          3,237                  02/16/10   05/26/10    JERSEN INDUSTRIES                   
                                                            HE44-6          4,611                  04/05/10   06/16/10    JERSEN INDUSTRIES                   
                                                            HE44-7          2,737                  04/05/10   06/16/10    JERSEN INDUSTRIES                   
                                                            HE44-8         -4,875                  08/10/10   11/12/10    JERSEN INDUSTRIES                   
                                                            HE44-9          1,321                  08/10/10   11/12/10    JERSEN INDUSTRIES                   
                                                            HE45-1         -3,636                  02/04/11   02/24/11    BURNICHE PIPING INC (dba BPI PIPING)
                                                            HE46-1         13,465                  04/29/09   07/17/09    MERIT PLUMBING & HEATING LLC        
                                                            HE46-2         12,084                  02/16/10   05/26/10    MERIT PLUMBING & HEATING LLC        
                                                            HE46-3          2,352                  02/16/10   05/26/10    MERIT PLUMBING & HEATING LLC        
                                                            HE46-4          8,192                  04/05/10   06/16/10    MERIT PLUMBING & HEATING LLC        
                                                            HE46-5          4,445                  02/04/11   02/24/11    MERIT PLUMBING & HEATING LLC        
                                                            HE46-6          1,310                  04/15/11   05/10/11    MERIT PLUMBING & HEATING LLC        
                                                            HE47-1         -1,304                  11/05/10   11/12/10    BROWNELL ELECTRIC CORP              
                                                            HE47-2           -690                  04/05/10   06/16/10    BROWNELL ELECTRIC CORP              
                                                            HE47-3          1,977                  08/10/10   11/12/10    BROWNELL ELECTRIC CORP              
                                                            HE47-4          1,840                  08/10/10   11/12/10    BROWNELL ELECTRIC CORP              
                                                            HE47-5            340                  02/18/11   03/09/11    BROWNELL ELECTRIC CORP              
                                                            HE61-1         99,800                  11/21/08   04/03/09    JUPITER ENVIRONMENTAL SERVICES INC. 
                                                            HE61-2          2,030                  04/29/09   07/29/09    JUPITER ENVIRONMENTAL SERVICES INC  
                                                            HE61-3            648                  11/05/10   11/12/10    JUPITER ENVIRONMENTAL SERVICES INC  
                                                            P72-4-1         3,138                  04/15/11   05/10/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-4-2         2,406                  10/06/11   12/20/11    HOOSICK VALLEY CONTRACTORS INC      
 
07-1315   Reconstruction               0-007-012  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-8-1           100                  02/16/10   04/27/10    ZANDRI CONSTRUCTION CORP.           
                                                            E53-8-2         1,283                  04/15/11   05/10/11    ZANDRI CONSTRUCTION CORP            
                                                            E54-8-1          -950                  07/11/11   07/27/11    JOHN V WARREN INC                   
                                                            E55-8-1          -453                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E57-8-1         1,002                  08/15/11   09/19/11    O'CONNELL ELECTRIC INC              
                                                            E57-8-2        -1,359                  10/06/11   07/17/13    O'CONNELLL ELECTRIC INC             
 
17-0049   Reconstruction               0-007-013  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            04-002          2,515                  10/22/18   11/13/18    Mazone Plumbing & Heating, Inc.     
                                                            06-008            471                  11/30/18   01/15/19    FLEX ELECTRIC LLC                   
 
21-1259   Reconstruction               0-007-015  03/11/22  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1306EP Energy Project               0-007-E01  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0444FP Reconstruction               0-007-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Iroquois Middle School:
91-1439   Reconstruction               0-008-007  06/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0007   Reconstruction               0-008-009  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0875   Reconstruction               0-008-010  03/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1584   Reconstruction               0-008-011  06/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0663   Reconstruction               0-008-012  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0781   Alterations                  0-008-013  05/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            IM40-1           -267                  04/24/09   07/29/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            IM40-2           -674                  10/08/09   11/17/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            IM40-3         53,953                  11/05/09   02/05/10    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            IM40-4          8,444                  02/16/10   05/28/10    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            IM40-5          9,580                  03/29/10   05/28/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            IM40-6          1,605                  08/10/10   11/12/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            IM40-7           -102                  02/18/11   03/09/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            IM41-1         11,993                  08/19/10   01/31/14    CRISAFULLI BROTHERS INC             
                                                            IM42-1         -8,032                  07/11/11   08/17/11    CRISAFULLI BROTHERS INC             
                                                            IM43-1         -1,741                  08/10/10   11/12/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            IM43-2         -3,899                  08/19/10   11/23/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            IR59-1         58,000                  04/24/09   07/29/09    ATLANTIC CONTRACTING & SPECIALTIES  
                                                            IR59-2         -5,200                  08/10/10   11/30/10    ATLANTIC CONTRACTING & SPECIALTIES  
                                                            P71-6-1        -1,673                  03/28/11   04/22/11    PETER LUIZZI & BROS CONTRACTING INC 
                                                            P72-7-1         1,706                  03/28/11   04/22/11    HOOSICK VALLEY CONTRACTORS, INC     
                                                            P72-7-2         3,511                  04/15/11   05/10/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P74-6-1           345                  08/15/11   09/19/11    FAMILY DANZ HEATING & A/C INC       
                                                            P75-6-1           524                  03/11/11   03/30/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            P75-6-2           656                  03/11/11   03/30/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            P75-6-3           276                  03/11/11   03/30/11    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            P75-6-4         1,774                  03/11/11   03/30/11    SCHENECTADY HARDWARE & ELECTRIC CO  
 
07-1316   Reconstruction               0-008-014  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-5-1        -3,842                  10/06/11   12/06/11    ZANDRI CONSTRUCTION CORP            
                                                            E53-5-2         1,052                  01/27/12   05/17/12    ZANDRI CONSTRUCTION CORP            
                                                            E55-5-1         2,420                  02/16/10   04/27/10    J. MCBAIN ELECTRIC, INC.            
                                                            E55-5-2           355                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-5-3           522                  02/04/11   03/03/11    J. MCBAIN ELECTRIC INC              
                                                            E55-5-4          -310                  02/18/11   05/03/11    J MCBAIN ELECTRIC INC               
                                                            E57-5-1          -500                  05/20/11   06/17/11    O'CONNELL ELECTRIC INC              
 
17-0050   Reconstruction               0-008-015  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-003          1,383                  10/22/18   11/13/18    Bonacquisti Brothers Construction   
                                                            03-007          1,356                  12/21/18   02/12/19    BONACQUISTI BROTHER CONSTRUCTION    
                                                            04-003          4,577                  10/22/18   11/13/18    Mazone Plumbing & Heating Inc.      
                                                            04-005          7,342                  11/30/18   01/15/19    MAZONE PLUMBING & HEATING INC.      
                                                            04-006            305                  12/21/18   02/01/19    MAZONE PLUMBING & HEATING INC.      
                                                            06-007          1,290                  11/30/18   01/15/19    FLEX ELECTRIC LLC                   
                                                            06-011          2,333                  11/30/18   01/15/19    FLEX ELECTRIC LLC                   
 
21-1586   Additions and Alterations    0-008-016  08/04/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-02          23,608                  03/06/23   12/18/23    MJ'S CONTRACTING SERVICES INC       
                                                            AC-03           7,608                  03/06/23   12/18/23    MJS CONTRACTING SERVICES INC        
                                                            AC-04          16,023                  03/06/23   12/18/23    MJS CONTRACTING SERVICES INC        
                                                            AC-05          15,741                  05/22/23   12/27/23    MJS CONTRACTING SERVICES            
                                                            EC-01           6,477                  05/09/23   12/29/23    KASSLEMAN ELECTRIC CO               
                                                            EC-02         -23,228                  06/22/23   01/02/24    KASSELMAN ELECTRIC                  
                                                            EC-03         -24,391                  08/14/23   12/29/23    KASSLEMAN ELECTRIC                  
                                                            EC-04               0                  08/14/23   12/29/23    KASSLEMAN ELECTRIC                  
                                                            GC-01               0                  05/01/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-02               0                  06/22/23   12/22/23    MURNANE BUILDING CONTRACTORS        
                                                            GC-03               0                  08/14/23   12/21/23    MURNANE BUILDING CONTRACTORS        
                                                            HC-01               0                  02/27/23   12/05/23    DIGESARE MECH INC                   
                                                            HC-02        -185,999                  02/27/23   12/05/23    DIGESARE MECH INC                   
                                                            HC-03               0                  06/22/23   01/02/24    DIGESARE MECHANICAL INC             
                                                            PC-01          28,000                  02/27/23   12/05/23    DIGESARE MECH INC                   
                                                            PC-02               0                  08/14/23   12/29/23    DIGESARE MECHANICAL INCORPORATED    
                                                            SC-01               0                  02/21/23   12/04/23    HMA CONTRACTING CORP                
                                                            SC-02           3,499                  05/09/23   12/22/23    HMA CONTRACTING CORP                
                                                            SC-03               0                  06/22/23   12/22/23    HMA CONTRACTING CORP                
                                                            SC-04               0                  06/22/23   12/22/23    HMA CONTRACTING CORP                
                                                            SC-05               0                  06/22/23     /  /      HMA CONTRACTING                     
                                                            SC-06               0                  06/22/23   01/09/24    HMA CONTRACTING CORP                
                                                            SC-06               0                  07/31/23     /  /      HMA CONTRACTING CORP                
                                                            SC-07               0                  08/14/23   12/21/23    HMA CONTRACTING CORP                
                                                            SC-08               0                  08/14/23   12/21/23    HMA CONTRACTING CORP                
 
03-0477FP Reconstruction               0-008-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-2007SC Visual Structural Inspection 0-008-SC1  06/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Birchwood Elementary:
91-0327   Additions and Alterations    0-021-001  10/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1311   Reconstruction               0-021-002  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0872   Additions and Alterations    0-021-003  04/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0005   Reconstruction               0-021-004  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1586   Reconstruction               0-021-005  06/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1765   Reconstruction               0-021-006  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0783   Additions and Alterations    0-021-007  05/09/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BE48-1         -3,930                  04/29/09   07/29/09    JERSEN INDUSTRIES                   
                                                            BE48-10         6,200                  06/05/12   10/23/12    Jerson Industries                   
                                                            BE48-2          3,614                  11/05/09   02/05/10    JERSEN INDUSTERIES                  
                                                            BE48-3          7,393                  02/16/10   05/26/10    JERSEN INDUSTRIES                   
                                                            BE48-4          8,490                  03/29/10   05/28/10    JERSEN INDUSTRIES                   
                                                            BE48-5          5,904                  04/08/10   06/16/10    JERSEN INDUSTRIES                   
                                                            BE48-6         -4,875                  08/10/10   11/23/10    JERSEN INDUSTRIES                   
                                                            BE48-7          2,627                  08/10/10   11/23/10    JERSEN INDUSTRIES                   
                                                            BE48-8         13,849                  08/10/10   11/23/10    JERSEN INDUSTRIES                   
                                                            BE48-9          2,637                  02/18/11   03/09/11    JERSEN INDUSTRIES                   
                                                            BE49-1         -6,251                  02/18/11   03/09/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            BE50-1         10,286                  04/29/09   07/17/09    MERIT PLUMBING & HEATING LLC        
                                                            BE50-2         19,701                  04/29/09   07/17/09    MERIT PLUMBING & HEATING LLC        
                                                            BE50-3            969                  07/22/09   08/21/09    MERIT PLUMBING & HEATING LLC        
                                                            BE50-4         14,093                  07/22/09   08/21/09    MERIT PLUMBING & HEATING LLC        
                                                            BE50-5          1,752                  02/16/10   05/26/10    MERIT PLUMBING & HEATING LLC        
                                                            BE50-6          4,212                  02/16/10   05/26/10    MERIT PLUMBING & HEATING LLC        
                                                            BE51-1         -3,069                  02/16/10   05/26/10    BROWNELL ELECTRIC CORP              
                                                            BE51-2          1,325                  08/10/10   11/23/10    BROWNELL ELECTRIC CORP              
                                                            BE51-3            513                  02/18/11   03/09/11    BROWNELL ELECTRIC CORP              
                                                            BE60-1        -18,348                  02/16/10   05/26/10    NETRIX INC                          
                                                            P71-5-1         6,335                  03/28/11   04/22/11    PETER LUZZI & BROS CONTRACTING INC  
                                                            P71-5-2        12,624                  03/28/11   04/22/11    PETER LUIZZI & BROS CONTRACTING INC 
                                                            P72-6-1        -2,452                  03/28/11   04/22/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P72-6-2           637                  03/28/11   04/22/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            P73-4-1         2,860                  03/28/11   04/22/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            P73-4-2         1,132                  03/28/11   04/22/11    BURNICHE PIPING INC dba BPI PIPING  
                                                            P74-5-1           355                  03/28/11   04/22/11    FAMILY DANZ HEATING & A/C INC       
                                                            P75-5-1           751                  03/11/11   03/30/11    SCHENECTADY HARDWARE & ELECTRIC CO  
 
07-1317   Additions and Alterations    0-021-008  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E53-7-1            90                  02/16/10   04/27/10    ZANDRI CONSTRUCTION CORP.           
                                                            E53-7-2         7,825                  02/04/11   03/03/11    ZANDRI CONSTRUCTION CORP            
                                                            E54-7-1        -1,650                  08/15/11   08/26/11    JOHN V WARREN INC                   
                                                            E55-7-1         1,421                  02/16/10   05/14/10    J. MCBAIN ELECTRIC, INC.            
                                                            E55-7-2           763                  02/04/11   03/03/11    J. MCBAIN INC                       
                                                            E55-7-3         1,225                  02/18/11   05/04/11    J MCBAIN ELECTRIC INC               
                                                            E55-7-3           575                  04/15/11   05/10/11    ZANDRI CONSTRUCTION CORP            
                                                            E57-7-1          -772                  10/06/11     /  /      O'CONNELL ELECTRIC INC              
 
17-0051   Reconstruction               0-021-009  03/29/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-008            940                  12/21/18   02/12/19    BONACQUISTI BROTHER CONSTRUCTION    
                                                            07-001          5,973                  11/30/18   01/09/19    S&L ROOFING & SHEET METAL           
 
18-1578   Reconstruction               0-021-010  03/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            08-002         -8,020                  09/26/19   09/30/19    RMB MECHANICAL, INC.                
 
21-1260   Reconstruction               0-021-012  03/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  12/23/22     /  /      B&D Industries Inc                  
                                                            MC-02               0                  10/03/22   07/27/23    Mc Elligott Inc                     
                                                            MC-06               0                  10/03/22   08/08/23    Mc Elligott Inc                     
                                                            MC-08               0                  11/07/22   11/02/23    T MC ELLIGOTT INC                   
                                                            MC-09               0                  12/27/22   12/14/23    T Mc Elligott Inc                   
                                                            MC-13           1,714                  05/09/23   12/29/23    T. MC ELLIGOTT                      
 
94-1310EP Energy Project               0-021-E01  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBus Garage (sold):
91-0887   Additions and Alterations    5-018-003  03/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1440   Reconstruction               5-018-004  06/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1309   Additions and Alterations    5-018-006  05/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0001   Reconstruction               5-018-007  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXLeased Bus Facility (see 5-025):
96-0002   Reconstruction               5-023-002  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0582   Reconstruction               5-023-L01  01/30/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hillside Ave Bus Garage (prev 5-023):
16-1059   Reconstruction               5-025-002  03/16/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-003          1,462                  09/20/17   10/10/17    General Roofing Contractors, LLC.   
 
20-1864   Additions and Alterations    5-025-003  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01           1,339                  06/13/22   05/01/23    MJ Contrs Servs                     
                                                            AC-02          -5,250                  06/13/22   05/01/23    MJ Contr Servs                      
                                                            RC2-01              0                  08/01/22   09/26/23    Henderson-Johnson Co Inc            
                                                            RC2-02              0                  08/01/22   09/26/23    Henderson-Johnson Co Inc            
                                                            RC2-03              0                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-04              0                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-05         26,777                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-06         18,674                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-07       -200,956                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-08          8,534                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-09         32,783                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-10         31,420                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
                                                            RC2-11         14,966                  03/06/23   12/18/23    HENDERSON - JOHNSON CO INC          
 

          Press Box/Athletic Tower/Snack Bar:
91-0139   New Construction             7-020-001  08/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
96-0009   Reconstruction               7-999-001  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1161   Reconstruction               7-999-002  03/26/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BC52-1          8,017                  09/21/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BC52-14        14,189                  08/19/10   09/13/10    JOHNSON CONTROLS INC                
                                                            BC52-15         1,693                  02/18/11   03/11/11    JOHNSON CONTROLS INC                
                                                            BC52-19        14,856                  08/15/11   12/29/11    JOHNSON CONTROLS INC                
                                                            BC52-2         18,049                  09/21/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BC52-20         2,948                  08/15/11   12/29/11    JOHNSON CONTROLS INC                
                                                            BC52-3          4,005                  09/21/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BC52-4          9,724                  09/21/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BC52-5          4,898                  09/21/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BC52-6          8,047                  09/24/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BC52-7          7,000                  10/08/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BC52-8          9,340                  10/08/09   11/12/09    JOHNSON CONTROLS INC                
                                                            BCS52-10        1,766                  02/16/10   05/13/10    JOHNSON CONTROLS INC.               
                                                            BCS52-11       16,841                  02/16/10   05/13/10    JOHNSON CONTROLS INC.               
                                                            BCS52-12       13,696                  01/27/12   07/17/12    JOHNSON CONTROLS INC                
                                                            BCS52-13       12,241                  08/10/10   09/28/10    JOHNSON CONTROLS INC                
                                                            BCS52-16        3,808                  04/15/11   05/10/11    JOHNSON CONTROLS INC                
                                                            BCS52-17        5,402                  04/15/11   05/10/11    JOHNSON CONTROLS INC                
                                                            BCS52-18        2,548                  04/15/11   05/10/11    JOHNSON CONTROLS INC                
                                                            BCS52-21        3,950                  12/27/11   07/17/12    Johnson Controls Inc.               
                                                            BCS52-9         4,557                  02/16/10   05/13/10    JOHNSON CONTROLS INC.               
 
08-0476   Reconstruction               7-999-003  11/20/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            58A-1          -7,215                  04/05/10   06/09/10    O'CONNELL ELECTRIC INC              
                                                            58A-2           1,267                  08/19/10   09/13/10    O'CONNELL ELECTRIC INC              
                                                            58A-3           2,147                  08/19/10   09/13/10    O'CONNELL ELECTRIC INC              
                                                            58A-4           1,744                  08/19/10   09/13/10    O'CONNELL ELECTRIC INC              
                                                            58B-1          -2,599                  04/05/10   06/09/10    O'CONNELL ELECTRIC INC              
                                                            58B-2          20,547                  05/20/11   06/09/11    O'CONNELL ELECTRIC INC              
                                                            58B-3           2,583                  07/11/11   09/08/11    O'CONNELL ELECTRIC INC              
                                                            58B-4          -7,431                  08/15/11   12/22/11    O'CONNELL ELECTRIC INC              
 

          Birchwood Teacher Conference Room:
19-1219SS Reconstruction               8-029-001  03/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Glencliff Teacher Conference Room:
19-1220SS Reconstruction               8-030-001  03/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE

SCHALMONT CSD-ROTTERDAM STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-05-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High/Middle School:
90-1758   Reconstruction               0-001-002  07/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1281   Reconstruction               0-001-003  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0258   Reconstruction               0-001-004  12/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1736   Reconstruction               0-001-005  07/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1053   Additions and Alterations    0-001-008  06/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-01         -98,477                  10/07/09   11/20/09    BAST HATFIELD INC                   
                                                            10-02          12,380                  12/22/04   01/10/05    Lenz Hardware                       
                                                            11-01           4,954                  12/22/04   01/10/05    T Lemme Mechanical                  
                                                            11-02           6,552                  03/09/05   03/25/05    T Lemme mechanical                  
                                                            11-04           2,728                  03/09/05   03/25/05    T Lemme mechanical                  
                                                            11-05           7,750                  04/09/05   03/25/05    T Lemme Mechanical                  
                                                            11-06           3,407                  03/09/05   03/25/05    T Lemme Mechanical                  
                                                            12-03          -8,666                  03/09/05     /  /      Kasselman Electric CO               
                                                            12-04          26,323                  12/22/04   01/10/05    Kasselman Electric                  
                                                            12-5           22,831                  01/24/05   02/11/05    Kasselman electric                  
                                                            13-01          56,982                  03/09/05     /  /      Adirondack Cabling                  
                                                            13-02           5,640                  05/09/05   03/25/05    Adirondack Cabling                  
                                                            13-03          10,498                  03/09/05   03/25/05    Adirondack Cabling                  
                                                            14-1           22,322                  03/09/05   03/25/05    Jupiter Environmental Service       
                                                            14-2           10,126                  12/22/04   01/10/05    Jupiter Environmental Service       
                                                            14-3           38,781                  12/22/04   01/10/05    Jupiter Environmental Service       
                                                            EC 12-09      200,000                  08/12/10   08/12/10    KASSELMAN ELECTRIC                  
 
01-1256   Reconstruction               0-001-010  06/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1477   Reconstruction               0-001-011  06/30/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0961   Reconstruction               0-001-012  04/28/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1620   Reconstruction               0-001-013  07/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             7,861                  07/17/09   08/22/12    JJ CURRAN & SON INC                 
                                                            5               1,142                  10/14/09   11/06/09    J.J. CURRAN & SON INC               
                                                            EL-001         -1,500                  05/11/09   08/21/09    J MCBAIN ELECTRIC INC               
                                                            GC-004           -439                  12/14/09   01/21/10    J.J. CURRAN & SON INC               
                                                            GC-01           5,000                  07/17/09   09/03/09    JJ CURRAN & SON INC                 
                                                            RC-002         -5,347                  12/21/09   02/09/10    JAMES A EDGAR COMPANY INC           
                                                            RC-003            -79                  03/19/10   06/14/10    JAMES A EDGAR COMPANY INC           
                                                            SC-001          3,243                  11/06/08   08/10/09    BOB TALHAM, INC.                    
                                                            SC-001          3,243                  12/02/08   04/21/09    BOB TALHAM INC.                     
                                                            SC-002         40,298                  09/25/09   10/08/09    HMA CONTRACTING CORP                
                                                            SC-003        150,911                  01/13/10   02/26/10    HMA CONTRACTING CORP                
                                                            SC-004         23,413                  01/13/10   02/18/10    HMA CONTRACTING CORP                
                                                            SC-005        -10,475                  03/18/10   05/28/10    HMA CONTRACTING CORP                
                                                            SC-01         248,500                  09/28/09   11/18/09    HMA CONTRACTING CORP                
 
08-0112   Reconstruction               0-001-015  02/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL-001          9,648                  09/29/09   11/03/09    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            EL-002          9,873                  09/29/09   11/03/09    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            EL-003         13,166                  08/31/09   08/10/12    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            EL-004          4,336                  11/02/09   12/17/09    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            EL-005          6,222                  11/02/09   12/17/09    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            EL-006         27,151                  02/11/10   04/16/10    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            EL-007         -1,562                  02/11/10   04/16/10    FLEX ELECTRICAL CONSTRUCTORS INC    
                                                            GC-001         55,435                  09/25/09   10/07/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            GC-002         21,877                  10/30/09   12/21/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            GC-003         12,944                  03/24/10   05/14/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            GC-004          5,460                  02/08/10   03/19/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            GC-005         -6,538                  08/19/10   09/14/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            GC-007         16,777                  08/19/10   09/14/10    LECHASE CONSTRUCTION SERVICES LLC   
                                                            HVAC-001      -94,065                  09/13/10   09/28/10    T. LEMME MECHANICAL INC             
                                                            PL-001         21,332                  09/25/09   10/09/09    MAZONE PLUMBING & HEATING INC       
                                                            PL-002         11,348                  09/25/09   10/09/09    MAZONE PLUMBING & HEATING INC       
                                                            PL-003         -3,946                  02/11/10   04/16/10    MAZONE PLUMBING & HEATING INC       
                                                            RC-001              0                  07/23/09   08/07/09    JAMES A EDGER COMPANY INC           
 
09-0599   Reconstruction               0-001-017  02/16/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-001        -38,208                  01/25/11   02/23/11    WB ROOFING & SHEETMETAL INC         
 
09-0602   Reconstruction               0-001-018  04/21/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-001        -12,000                  01/14/11   02/28/11    SULLIVAN CONTRACTING INC            
                                                            EL-001          5,358                  09/13/10   09/28/10    BROWNELL ELECTRIC CORP              
                                                            EL-002          2,039                  09/13/10   09/28/10    BROWNELL ELECTRIC CORP              
                                                            EL-003          8,022                  01/05/11   02/07/11    BROWNELL ELECTRIC CORP              
                                                            GC-001          4,170                  10/01/10   10/21/10    EASTERN BUILDING & RESTORATION INC  
                                                            GC-002          8,940                  12/20/10   01/07/11    EASTERN BUILDING & RESTORATION INC  
                                                            GC-003          1,023                  01/24/11   02/28/11    EASTERN BUILDING & RESTORATION INC  
                                                            GC-004            348                  03/21/11   05/10/11    EASTERN BUILDING & RESTORATION INC  
                                                            HVAC-001       -3,100                  04/07/11   05/13/11    JOHN V WARREN INC                   
                                                            PL-001         -3,000                  10/19/10   10/29/10    MAZONE PLUMBING & HEATING INC       
 
10-0774   Reconstruction               0-001-019  05/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-001         -1,790                  09/22/11   11/01/11    BOB TALHAM INC                      
                                                            WC-001         -5,000                  01/10/12   10/23/12    N.E.P. GLASS LTD                    
 
12-0767   Reconstruction               0-001-020  04/03/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-001         40,679                  07/17/13   07/22/13    HMA Contracting Corp                
                                                            SC-002          1,764                  08/15/13   08/26/13    HMA Contrtacting Corp.              
                                                            TC-001         28,428                  01/02/14   01/24/14    T. McElligott, Inc.                 
                                                            TC-002              0                  01/02/14   01/24/14    T. MCELLIGOTT, INC.                 
                                                            TC-003         18,502                  01/16/14   03/04/14    T. McElligott, Inc.                 
                                                            TC-01          18,502                  01/16/14     /  /      T. McElligott, Inc.                 
 
14-0024   Reconstruction               0-001-021  08/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          4,653                  02/06/15   06/17/15    Finelli Construction Inc.           
 
17-1891   Additions and Alterations    0-001-022  03/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1-01                0                  03/02/20   10/30/20    MURNANE BUILDING CONTRACTORS, INC.  
                                                            1-02           38,824                  09/27/21   12/01/22    Murnane Bldg Contractors, Inc       
                                                            2-01              -28                  06/04/21   03/29/22    Tri Valley Plumbing & Heating       
                                                            3-01          -95,440                  05/07/21   08/24/21    RMB MECHANICAL, INC.                
                                                            4-01            4,603                  09/27/21   11/30/22    Hewitt Young Electric, LLC          
                                                            4-02            5,406                  09/27/21   06/14/22    Hewitt Young Electric, LLC          
                                                            4-03            2,776                  09/27/21   06/14/22    Hewitt Young Electric, LLC          
 
17-0831   Reconstruction               0-001-025  05/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -73,595                  02/11/19   03/05/19    U.W. MARX INC                       
                                                            HMA-1               0                  10/18/18   11/13/18    NEOPLANTA RESTORATION INC           
                                                            MA-01               0                  01/25/19   03/01/19    MID-STATE INDUSTRIES, LTD.          
                                                            RC-01         -14,500                  10/18/18   11/13/18    TITAN ROOFING INC                   
                                                            RTC-1          -5,000                  10/18/18   11/13/18    COPELAND COATING COMPANY A DIV OF CR
                                                            SC-01A        -10,800                  03/21/19   03/25/19    EVOLUTION CONSTRUCTION SERVICES, LLC
 
22-1212FA Reconstruction               0-001-026  04/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1281EP Energy Project               0-001-E01  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2037FP Reconstruction               0-001-FP1  12/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Woestina Elementary:
95-0260   Reconstruction               0-002-003  12/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1054   Additions and Alterations    0-002-005  06/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            10-01           9,729                  06/01/04   07/15/04    Lenz Hardware                       
                                                            11-03          25,448                  01/24/05   02/11/05    T Lemme mechanical                  
                                                            12-01             450                  05/27/04   07/15/04    Kasselman Elec.                     
                                                            12-01             450                  02/09/05     /  /      Kasselman Electric Co               
                                                            12-02          -2,295                  05/27/04   07/15/04    Kasselman Elec.                     
                                                            12-02          -2,295                  03/09/05     /  /      Kasselman Electric                  
 
99-1558   Reconstruction               0-002-006  05/22/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0032   Reconstruction               0-002-007  07/31/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          xxSchonowe School (sold 1/1/2020):
07-1622   Reconstruction               0-003-007  06/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MECH-001       -6,891                  12/18/09   01/29/10    JOHN V. MARREN                      
                                                            MECH-002        5,586                  02/23/10   05/13/10    JOHN V WARREN INC                   
 

          Jefferson Elementary:
94-1280   Reconstruction               0-005-004  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0262   Reconstruction               0-005-005  12/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1734   Reconstruction               0-005-006  07/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1559   Reconstruction               0-005-008  05/22/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0541   Additions and Alterations    0-005-010  05/23/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -16,172                  03/25/03   03/28/03    DePoalo & Son                       
                                                            1-04           10,573                  10/21/03   10/24/03    DePoalo & Son                       
                                                            1-06            2,623                  05/27/04     /  /      DePoalo & Son                       
                                                            1-07            3,415                  05/27/04   07/06/04    DePoalo & Son                       
                                                            2-01            2,841                  12/02/03   12/09/03    Lenz Hardware                       
                                                            2-02            1,250                  12/22/03   01/08/04    Lenz Hardware                       
                                                            2-03           24,875                  05/27/04     /  /      Lenz Hardware                       
                                                            2-5             1,508                  01/24/05   04/28/05    Lenz Hardware inc                   
                                                            3-01          -11,500                  04/02/03   04/03/03    DiGesare Mech.                      
                                                            3-02             -181                  08/06/03   09/09/03    DiGesare Mech.                      
                                                            4-01           -1,226                  03/25/03   03/28/03    Harold R. Clune                     
                                                            5-01            6,616                  04/29/03   05/07/03    Adirondack Cabling                  
                                                            5-02            3,069                  08/20/03   08/27/03    Adirondack Cabling                  
                                                            5-03              806                  08/20/03   08/27/03    Adirondack Cabling                  
                                                            5-06             -217                  12/22/04   04/28/05    Adirondack Cabling Inc              
                                                            6-01            4,392                  06/26/03   07/02/03    Excel Insulation                    
                                                            6-02            7,488                  08/20/03   08/27/03    Excel Insulation                    
                                                            6-03            7,300                  12/02/03   12/09/03    Excel Insulation                    
                                                            6-04            7,011                  12/03/03   12/09/03    Excel Insulation                    
                                                            6-05           -9,160                  05/27/04   06/09/04    Excel Insulation                    
 
10-0732   Reconstruction               0-005-013  02/14/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-001          9,660                  07/28/11   09/08/11    S&L ROOFING & SHEETMETAL            
                                                            RC-002         11,444                  09/13/11   10/14/11    S&L ROOFING & SHEETMETAL INC        
                                                            RC-003         -1,128                  09/26/11   10/31/11    S&L ROOFING & SHEETMETAL INC        
 
10-0775   Reconstruction               0-005-014  05/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          3,965                  03/14/12   10/19/12    LG WHITE & SONS GENERAL CONTRACTORS 
                                                            MC-002           -125                  10/12/11   10/24/12    EASTERN HEATING & COOLING INC       
                                                            MC-01               0                  08/15/11   01/25/13    EASTERN HEATING & COOLING INC       
                                                            WC-001         -2,000                  01/10/12   10/23/12    N.E.P. GLASS LTD                    
 
11-1068   Reconstruction               0-005-015  08/06/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  10/22/13   11/22/13    J.J. Curran & Son, Inc.             
                                                            SC-01          -3,350                  10/23/13   11/22/13    Emprie Paving of New York, Inc.     
 
12-0825   Reconstruction               0-005-016  04/04/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-001           -109                  11/15/13   11/22/13    Mousture Barriers, Inc.             
                                                            RC-002          7,226                  12/27/13   02/04/14    Moisture Barriers, Inc.             
 
17-0832   Reconstruction               0-005-017  05/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,000                  11/13/18   01/22/19    HAROLD R. CLUNE, INC.               
                                                            GC-01           1,633                  02/11/19   03/05/19    U.W. MARX INC.                      
                                                            MC-01              77                  10/18/18   11/30/18    RMB MECHANICAL INC                  
                                                            SC-01         -10,800                  03/21/19   03/25/19    EVOLUTION CONSTRUCTION SERVICES, LLC
 
22-1213FC Reconstruction               0-005-018  04/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1280EP Energy Project               0-005-E01  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2038FP Reconstruction               0-005-FP1  12/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pine Grove School:
95-0264   Reconstruction               0-006-003  12/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXMariaville Elementary (sold 2017):
95-0266   Reconstruction               0-008-003  12/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0225   Reconstruction               0-008-004  09/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0542   Additions and Alterations    0-008-006  05/23/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02          -45,000                  03/25/03   04/01/03    DePoalo & Son                       
                                                            1-03          -11,829                  09/25/03   10/02/03    DePoalo & Son                       
                                                            1-05              846                  05/27/04   06/07/04    DePoalo & Son                       
                                                            2-04            1,130                  06/01/04   06/09/04    Lenz Hardware                       
                                                            2-6              -159                  01/24/05   04/28/05    Lenz Hardware inc                   
                                                            3-03             -273                  08/06/03   08/12/03    DiGesare Mech.                      
                                                            5-05             -849                  12/22/04   04/28/05    Adirondack Cabling                  
 

          XXBldg 100-Bus Storage (sold 5/2021):
96-0226   Reconstruction               4-004-001  09/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Maint. Mechanics Garage:
96-0227   Reconstruction               5-011-002  09/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1560   Reconstruction               5-011-003  05/22/00  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0833   Additions and Alterations    5-011-004  05/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -1,019                  02/11/19   03/05/19    U.W. MARX INC.                      
 

          Transportation Building:
18-1875   New Construction             5-022-001  10/22/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -21,995                  01/31/20   02/26/20    MURNANE BUILDING CONTRACTORS, INC.  
                                                            1-02         -152,922                  06/25/21   03/11/22    Murnane Building Contractors        
                                                            1-02         -152,922                  05/30/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            2-01           25,147                  07/26/21   04/01/22    Tri-Valley Plumbing & Heating       
                                                            4-01           17,619                  01/25/21   04/08/21    HUEN ELECTRIC, INC.                 
                                                            5-01         -419,000                  06/12/20   07/20/20    O'CONNELL ELECTRIC CO.,INC.         
 

          Track Pressbox/Concess.Stand:
01-1257   New Construction             7-017-001  06/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            8-01             -770                  06/26/03   07/02/03    Stilsing Elec.                      
 

          District-Wide:
99-1546   Reconstruction               7-999-001  05/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0734   Reconstruction               7-999-003  02/26/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            TC-001          3,868                  11/18/13   12/03/13    GraceCom Telecommunications         
 

ROTTERDAM-MOHONASEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-05-15-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Senior High School:
91-0582   Reconstruction               0-001-003  01/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1188   Reconstruction               0-001-004  04/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1156   Reconstruction               0-001-005  05/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1543   Reconstruction               0-001-006  06/02/95  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
95-1466   Reconstruction               0-001-007  06/04/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1601   Additions and Alterations    0-001-008  09/23/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1DW-002        -2,097                  02/04/02   05/13/02    Wm. Keller & Sons                   
                                                            2M-001         26,858                  02/04/02   05/13/02    UW Marx                             
                                                            2M-002         36,300                  02/04/02   05/13/02    UW Marx                             
                                                            2M-003         12,507                  02/04/02   05/13/02    UW Marx                             
                                                            2M-004        -42,648                  02/04/02   05/13/02    UW Marx                             
                                                            2M-005         32,391                  02/04/02   05/13/02    UW Marx                             
                                                            2M-006        113,245                  02/04/02   05/13/02    UW Marx                             
                                                            2M-007       -102,035                  02/04/02   05/13/02    UW Marx                             
                                                            2M-008         25,000                  02/04/02   05/13/02    UW Marx                             
                                                            2M-009           -345                  02/04/02   05/13/02    UW Marx                             
                                                            2M010         -49,231                  02/13/02   03/21/02    UW Marx                             
                                                            3M-001          1,108                  02/04/02   05/13/02    Mazone Plumbing                     
                                                            3M-002          3,165                  02/04/02   05/13/02    Mazone Plumbing                     
                                                            3M-003        -17,278                  02/04/02   05/13/02    Mazone Plumbing                     
                                                            4M-001          2,054                  02/04/02   05/13/02    EW Tompkins                         
                                                            4M-002         -2,140                  02/04/02   05/13/02    EW Tompkins                         
                                                            4M-003        -30,018                  03/20/02   05/24/02    EW Tompkins                         
                                                            5DW-001         2,698                  02/04/02   05/13/02    Hendler Elec.                       
                                                            5DW-002         1,162                  02/04/02   05/13/02    Hendler Elec.                       
                                                            5DW-005        -3,000                  02/04/02   05/13/02    Hendler Elec.                       
                                                            6DW-001        19,706                  02/04/02   05/13/02    Spyder Tech.                        
                                                            6DW-002        -4,000                  02/04/02   05/13/02    Spyder Technologies                 
                                                            7M-001         31,350                  02/04/02   05/13/02    Waterblock Roofing                  
                                                            7M-002         93,368                  02/04/02   05/13/02    Waterblock Roofing                  
                                                            7M-003         -2,100                  02/04/02   05/13/02    Waterblock Roofing                  
 
98-0001   Reconstruction               0-001-009  07/06/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1487   Reconstruction               0-001-010  06/09/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-2 SITE       98,718                  03/22/02   05/06/02    James H. Maloy                      
                                                            CCTV-1         -9,682                  12/18/01   03/27/02    Wesley J. Staroba                   
                                                            EL-1           -3,098                  12/18/01   03/27/02    Wesley J. Staroba                   
                                                            MECH-2         68,795                  05/22/03   05/22/03    Tri-Valley Plumbing                 
                                                            MECH-3            500                  02/04/02   04/04/02    Tri-Valley Plumbing                 
 
05-0443   Additions and Alterations    0-001-011  03/21/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL - 001            0                  09/10/07   11/07/07    JUSTIN ELECTRICAL, INC.             
                                                            GC-001           -367                  10/15/07   11/08/07    MALONE & TATE BUILDERS, INC.        
                                                            HVAC-1         -7,453                  09/26/07   01/15/08    MAZONE PLUMBING & HEATING, INC.     
                                                            PL-001         -7,004                  11/13/07   01/28/08    Mazone Plumbing & Heating           
                                                            SC-002          1,077                  06/08/07   06/20/07    Empire Paving of Schenectady        
 
08-0323   Additions and Alterations    0-001-012  03/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-02         -10,662                  06/26/13   07/22/13    EXCEL INSULATION CO INC             
                                                            03-01          18,865                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-02           7,023                  04/30/12   10/24/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-03           2,137                  04/30/12   10/24/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-04           8,279                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-05           4,109                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-06             873                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-07           3,148                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-08           3,291                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-09          26,042                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-10          97,609                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-11          44,464                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-12           6,632                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-13           2,442                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-14           1,336                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-15             517                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-16           2,244                  01/30/12   08/22/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            03-17          -1,290                  04/30/12   10/24/12    BETTE & CRING CONSTRUCTION GROUP    
                                                            06-02         -15,373                  04/30/12   06/17/19    CAMPITO PLUMBING & HEATING INC      
                                                            08-01          -3,093                  04/30/12   10/18/13    DIGESARE MECHANICAL INC             
                                                            09-04          11,978                  01/30/12     /  /      KASSELMAN ELECTRIC CO INC           
                                                            09-06          25,206                  01/30/12   04/17/12    KASSELMAN ELECTRIC CO INC           
                                                            09-07           6,563                  01/30/12     /  /      KASSELMAN ELECTRIC CO INC           
                                                            09-09             993                  01/30/12   04/17/12    KASSELMAN ELECTRIC CO INC           
                                                            09-10          14,156                  01/30/12   04/17/12    KASSELMAN ELECTRIC CO INC           
                                                            09-11           1,870                  01/30/12   04/17/12    KASSELMAN ELECTRIC CO INC           
                                                            09-12          18,588                  01/30/12     /  /      KASSELMAN ELECTRIC CO INC           
                                                            09-15             -13                  04/30/12   10/18/13    KASSELMAN ELECTRIC CO INC           
                                                            10-03           4,708                  01/30/12   04/17/12    TOTAL FACILITY SOLUTIONS INC        
                                                            10-06          -6,424                  06/26/13   07/26/13    TOTAL FACILITY SOLUTIONS INC        
                                                            10-07          -3,450                  06/26/13   07/26/13    TOTAL FACILITY SOLUTIONS INC        
                                                            12-01          25,638                  01/30/12   04/17/12    SHAKER FLATS LANDSCAPING INC        
                                                            12-02          21,671                  01/30/12   08/22/12    SHAKER FLATS LANDSCAPING INC        
                                                            12-03          57,783                  06/26/13   08/21/13    SHAKER FLATS LANDSCAPING INC        
                                                            12-04          -4,596                  06/28/13   07/19/13    Shaker Flats Landscaping Inc.       
                                                            16-02          -5,786                  04/25/13   07/09/13    WAINSCHAF ASSOCIATES INC            
 
10-0713   Reconstruction               0-001-014  03/03/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             8,175                  02/07/12   07/17/12    SOLAR LIBERTY ENERGY SYSTEMS INC    
 
14-0083   Reconstruction               0-001-015  03/18/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            04A-02         -1,453                  11/30/16   01/06/17    T. McElligott                       
                                                            13-02          34,187                  12/03/15   12/23/15    PLANK CONSTRUCTION CO.,INC.         
                                                            13-05             423                  11/30/16   12/27/16    Plank Construction Co., Inc.        
                                                            13-05             423                  12/19/16   12/29/16    Plank Construction Co., Inc.        
                                                            13-06             -18                  12/19/16   03/06/17    Plank Construction Co., Inc.        
                                                            15E1A-06          183                  12/19/16   01/06/17    Kasselman Electric Co., Inc.        
                                                            B07-01        168,000                  03/03/16   03/11/16    James H. Maloy, Inc.                
                                                            Site-01       -18,126                  11/30/16   01/06/17    HMA Contracting Corporation         
 
15-0062   Additions and Alterations    0-001-016  05/09/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            32-01          32,251                  08/30/17   09/14/17    Plank Construction Co., Inc.        
                                                            32-02          -9,213                  12/12/18   01/23/19    PLANK CONSTRUCTION CO., INC.        
                                                            33-01           2,136                  06/29/17   10/30/17    BPI Piping, Inc.                    
                                                            33-02           2,651                  08/30/17   10/04/17    BPI Piping, Inc                     
                                                            33-03            -527                  12/12/18   01/22/19    BPI PIPING, INC.                    
                                                            33-04           1,475                  10/06/17   10/31/17    BPI Piping, Inc.                    
                                                            33-05           6,097                  01/22/18   04/06/18    BPI Piping, Inc.                    
                                                            34-01         -40,437                  12/12/18   01/22/19    DIGESARE MECHANICAL, INC.           
                                                            35-01          -2,000                  12/12/18   01/22/19    J.MCAIN ELECTRIC INC.               
                                                            35-02         -26,042                  12/12/18   01/22/19    J. MCBAIN ELECTRIC INC.             
                                                            36-01          36,880                  02/08/17   03/02/17    Northeast Interior Systems          
                                                            36-02          -6,300                  12/17/18   01/15/19    northeast interior systems          
                                                            AD33-01             0                  12/17/18   01/16/19    BPI PIPING                          
                                                            AD33-02             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD33-03             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD33-04             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD33-05             0                  12/17/18   01/16/19    BPI PIPING                          
                                                            AD33-06             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD33-08             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD33-08             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD33-09             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD33-10             0                  12/17/18   01/16/19    BPI PIPING, INC.                    
                                                            AD34-01             0                  12/17/18   01/15/19    GIDESARE MECHANICAL, INC.           
                                                            AD34-02             0                  12/17/18   01/16/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-03             0                  12/17/18   01/16/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-04             0                  12/17/18   01/16/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-05             0                  12/17/18   01/15/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-07             0                  12/17/18   01/15/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-08             0                  12/17/18   01/15/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-09             0                  12/17/18   01/16/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-10             0                  12/17/18   01/15/19    DIGESARE MECHANICAL, INC.           
                                                            AD34-11             0                  12/17/18   01/16/19    DIGESARE MECHANICAL, INC.           
                                                            AD36-01             0                  12/17/18   01/15/19    NORTHEAST INTERIOR SYSTEMS          
 
17-0676   Reconstruction               0-001-017  06/12/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            41-01         -37,715                  10/03/19   10/21/19    GALLO CONSTRUCTION CORP.            
                                                            41-02          41,133                  11/20/19   12/04/19    GALLO CONSTRUCTION CORP.            
                                                            41-03           9,247                  01/09/20   01/28/20    GALLO CONSTRUCTION CORP.            
                                                            41-04            -567                  01/09/20   01/28/20    GALLO CONSTRUCTION CORP.            
                                                            41-05          -1,800                  06/24/20   01/27/22    Gallo Construction Corp             
                                                            41A-01              0                  10/03/19   10/21/19    GALLO CONSTRUCTION CORP.            
                                                            41A-02              0                  11/20/19   12/04/19    GALLO CONSTRUCTION CORP.            
                                                            41A-03              0                  11/20/19   12/04/19    GALLO CONSTRUCTION CORP.            
                                                            43-01          -5,000                  06/24/20   03/24/22    Kasselman Electric Co.              
 
21-0557   Reconstruction               0-001-018  05/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-01           8,300                  07/10/23     /  /      MID-STATE IMDUSTRIES                
 

          Herman L Bradt Elementary:
90-0763   Reconstruction               0-004-008  02/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1467   Reconstruction               0-004-009  06/04/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1602   Additions and Alterations    0-004-010  09/23/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1DW-001       107,930                  02/04/02   07/24/02    Wm. Keller & Sons                   
                                                            2B-001         18,800                  02/04/02   03/25/02    Plank Const.                        
                                                            2B-002          1,289                  02/04/02   03/25/02    Plank Const.                        
                                                            2B-003          7,823                  02/04/02   03/25/02    Plank Const.                        
                                                            3B-001            674                  02/04/02   03/25/02    Mazone Plumbing                     
                                                            3B-002          2,258                  02/04/02   07/24/02    Mazone Plumbing                     
                                                            3B-003          4,685                  02/04/02   03/25/02    Mazone Plumbing                     
                                                            4B-001           -876                  02/04/02   03/25/02    Crisafulli Bros.                    
                                                            4B002         -17,008                  02/13/02   03/21/02    Crisafulli Brothers                 
 
99-1485   Reconstruction               0-004-011  06/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0476   Reconstruction               0-004-012  02/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            54,283                  11/30/05     /  /      Collett Mechanical                  
                                                            001               859                  03/31/06   10/13/06    Empire Paving of schenectady        
                                                            002            50,165                  12/08/05   03/14/06    COLLETT MECHANICAL, INC.            
                                                            003            17,700                  12/05/05   12/12/07    COLLETT MECHANICAL, INC.            
                                                            005            31,649                  03/31/06   12/12/07    Collett mechanical                  
 
05-0674   Reconstruction               0-004-013  05/05/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            RC-001        -12,885                  01/18/07   03/15/07    MId State Industries                
 
08-0324   Reconstruction               0-004-014  03/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-02             -50                  06/26/13   08/12/13    NIRAM INC                           
                                                            04-01          25,146                  01/25/12   08/22/12    EASTERN BUILDING AND RESTORATION    
                                                            04-03           1,253                  01/25/12   04/11/12    EASTERN BUILDING AND RESTORATION    
                                                            06-03          -8,098                  06/07/12   10/22/12    CAMPITO PLUMBING & HEATING INC      
                                                            07-01          -1,410                  06/26/13   07/31/13    JOHNSON CONTROLS                    
                                                            08-03          -2,320                  05/14/12     /  /      DIGESARE MECHANICAL INC             
                                                            09-03             889                  01/25/12     /  /      KASSELMAN ELECTRIC CO INC           
                                                            09-13             -16                  05/14/12   09/25/12    KASSELMAN ELECTRIC CO INC           
                                                            10-01           5,527                  01/25/12   04/11/12    TOTAL FACILITY SOLUTIONS INC        
                                                            10-05          -5,542                  06/26/13   07/26/13    TOTAL FACILITY SOLUTIONS INC        
                                                            15-01          -7,100                  01/25/12   08/22/12    J. MCBAIN INC                       
                                                            e4-04            -836                  06/28/13   07/19/13    Eatern Building and Restoration     
 
07-1937   Reconstruction               0-004-015  04/16/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-BB-01       -4,989                  06/30/09     /  /      T. LEMME MECHANICAL INC             
 
14-0084   Additions and Alterations    0-004-016  03/18/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-03            -424                  11/30/16   01/06/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            04A-04           -935                  11/30/16   01/06/17    T. McElligott                       
                                                            14GC-006            0                  12/19/16   01/06/17    Sam Greco Construction, Inc.        
                                                            14GC-007          542                  12/19/16   12/28/16    Sam Greco Construction, Inc.        
                                                            14GC-08         2,309                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-12         1,750                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-14         2,730                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-17        23,851                  12/19/16   12/28/16    Sam Greco Construction, Inc.        
                                                            14GC-19          -392                  12/19/16   01/06/17    Sam Greco Construction, Inc.        
                                                            14GC-19          -392                  02/09/17     /  /      Sam Greco Construction, Inc.        
                                                            16E2A-01        1,162                  12/19/16   01/06/17    Kasselman Electric Co., Inc.        
 
21-0558   Reconstruction               0-004-018  05/10/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pinewood Elementary School:
90-1189   Reconstruction               0-005-004  04/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0328   Additions and Alterations    0-005-005  10/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1319   Reconstruction               0-005-006  06/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1603   Additions and Alterations    0-005-007  09/23/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2P-001         -3,745                  02/04/02   03/25/02    Plank Const.                        
                                                            3P-001          1,075                  02/04/02   03/25/02    Mazone Plumbing                     
                                                            3P-002         -3,000                  02/04/02   03/25/02    Mazone Plumbing                     
                                                            4P-001            743                  02/04/02   03/25/02    Mazone Plumbing                     
                                                            4P-002         -3,674                  02/04/02   03/25/02    Mazone Plumbing                     
 
99-1486   Reconstruction               0-005-008  06/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0477   Reconstruction               0-005-009  02/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-B               0                  09/29/06   10/13/06    Empire Pavomg pf Schenectady, Inc.  
                                                            RC-001        -40,875                  12/20/05   10/05/06    Quaker Bay                          
 
08-0325   Additions and Alterations    0-005-010  03/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            02-01               0                  06/26/13   08/12/13    NIRAM INC                           
                                                            04-05          -2,094                  06/28/13   07/19/13    Eastern Building and Restoration    
                                                            05-01         -86,941                  05/14/12   09/25/12    TRI-VALLEY PLUMBING & HEATING INC   
                                                            07-03            -500                  06/26/13   08/12/13    JOHNSON CONTROLS                    
                                                            08-02          -2,516                  05/14/12   09/25/12    DIGESARE MECHANICAL INC             
                                                            09-01          15,813                  01/25/12   04/11/12    KASSELMAN ELECTRIC CO INC           
                                                            09-02          23,195                  01/25/12     /  /      KASSELMAN ELECTRIC CO INC           
                                                            09-08           1,524                  01/25/12   04/11/12    KASSELMAN ELECTRIC CO INC           
                                                            09-16              -9                  05/14/12   08/12/13    KASSELMAN ELECTRIC CO INC           
                                                            10-04           6,989                  01/25/12   04/11/12    TOTAL FACILITY SOLUTIONS INC        
                                                            10-08            -569                  06/26/13   07/31/13    TOTAL FACILITY SOLUTIONS INC        
                                                            11-01         -14,813                  06/07/12   10/23/12    SARATOGA RESTAURANT EQUIPMENT SALES 
                                                            13-01          49,900                  01/25/12   04/11/12    SHAKER FLATS LANDSCAPING INC        
                                                            13-02           6,260                  01/25/12   04/11/12    SHAKER FLATS LANDSCAPING INC        
                                                            13-03               0                  06/28/13   07/19/13    Shaker Flats Landscaping Inc.       
 
14-0086   Additions and Alterations    0-005-011  03/18/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-02          -4,226                  11/30/16   01/06/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            04A-03           -324                  11/30/16   01/06/17    T. McElligott                       
                                                            14-01          80,610                  12/03/15   12/23/15    SAM GRECO CONSTRUCTION,INC.         
                                                            14GC-02         9,004                  12/29/15   01/12/16    Sam Greco Construction, Inc.        
                                                            14GC-03         4,098                  12/29/15   01/12/16    Sam Greco Construction, Inc.        
                                                            14GC-04         1,649                  12/19/16   12/28/16    Sam Greco Construction, Inc.        
                                                            14GC-05         4,920                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-06        19,149                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-07         1,984                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-09         3,498                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-10         6,664                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-11         8,109                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-13         5,008                  10/28/16   11/22/16    Sam Greco Construction, Inc.        
                                                            14GC-15         2,057                  10/28/16   11/17/16    Sam Greco Construction, Inc.        
                                                            14GC-16           574                  12/19/16   12/28/16    Sam Greco Construction, Inc.        
                                                            14GC-18        17,114                  12/19/16   12/28/16    Sam Greco Consruction, Inc.         
                                                            14GC-20          -321                  12/19/16   01/27/17    Sam Greco Construction, Inc.        
                                                            16E2A-02        2,301                  12/19/16   01/06/17    Kasselman Electric Co., Inc.        
                                                            AD02EC01            0                  06/14/17   07/13/17    Kasselman Electric Co., Inc.        
                                                            AD02EC02            0                  06/14/17   07/13/17    Kasselman Electric Co., Inc.        
                                                            AD02EC04            0                  06/14/17   07/13/17    Kasselman Electric Co., Inc.        
                                                            AD02EC06            0                  06/14/17   07/13/17    Kasselman Electric Co., Inc.        
                                                            AD02EC07            0                  06/14/17   07/13/17    Kasselman Electric Co., Inc.        
                                                            AD03PC02            0                  06/14/17   07/13/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            AD03PC03            0                  06/14/17   07/13/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            AD03PC04            0                  06/14/17   07/13/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            AD03PC05            0                  06/14/17   07/13/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            AD04A-04            0                  06/14/17   07/14/17    T. McElligott                       
                                                            AD04A-05            0                  06/14/17   07/14/17    T. McElligott                       
                                                            AD04A-06            0                  06/14/17   07/14/17    T. McElligott                       
                                                            AD04A-10            0                  06/14/17   07/14/17    T. McElligott                       
                                                            AD04A-13            0                  06/14/17   07/14/17    T. McElligott                       
                                                            AD14GC01            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
                                                            AD14GC02            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
                                                            AD14GC03            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
                                                            AD14GC04            0                  06/14/17   07/14/17    Sam Greco Construction, Inc.        
                                                            AD14GC05            0                  06/14/17   06/23/17    Sam Greco COnstruction, Inc.        
                                                            AD14GC08            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
                                                            AD14GC09            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
                                                            AD14GC10            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
                                                            AD14GC11            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
                                                            AD14GC12            0                  06/14/17   06/23/17    Sam Greco Construction, Inc.        
 
17-0678   Reconstruction               0-005-012  06/12/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            42-01           2,300                  01/06/20   01/21/20    COLONIE MECHANICAL CONTRACTORS,INC. 
                                                            42-02          12,800                  01/06/20   01/21/20    COLONIE MECHANICAL CONTRACTORS, INC.
                                                            42-03           7,900                  01/06/20   01/21/20    COLONIE MECHANICAL CONTRACTORS,INC. 
                                                            42-04           2,000                  01/06/20   01/21/20    COLONIE MECHANICAL CONTRACTORS, INC.
                                                            42-05         -25,000                  01/06/20   01/21/20    COLONIE MECHANICAL CONTRACTORS, INC.
 
21-0559   Reconstruction               0-005-013  05/10/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Draper Junior High:
94-0288   Reconstruction               0-007-006  10/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1468   Reconstruction               0-007-007  06/04/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1604   Additions and Alterations    0-007-008  09/23/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2D-001            720                  02/04/02   05/13/02    Plank Const.                        
                                                            2D-002            324                  02/04/02   05/13/02    Plank Const.                        
                                                            2D-003         -1,104                  02/04/02   05/13/02    Plank Const.                        
                                                            2D-004          4,440                  02/04/02   05/13/02    Plank Const.                        
                                                            2D-005         -1,269                  02/04/02   05/13/02    Plank Const.                        
                                                            3D-001          3,795                  02/04/02   05/13/02    MacDonald Plumbing                  
                                                            5DW-003        -1,616                  02/04/02   05/13/02    Hendler Elec.                       
                                                            5DW-004          -182                  02/04/02   05/13/02    Hendler Elec.                       
                                                            CO-2D006     -105,957                  07/12/02   11/05/02    Plank Construction                  
 
99-1488   Reconstruction               0-007-009  06/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0444   Additions and Alterations    0-007-010  03/21/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL - 002         -804                  09/10/07   11/07/07    JUSTIN ELECTRICAL, INC.             
                                                            GC-002              0                  10/15/07   11/08/07    MALONE & TATE BUILDERS, INC.        
                                                            SC-001          3,250                  06/18/07   07/17/07    Empire Paving of Schenectady        
 
08-0326   Additions and Alterations    0-007-011  03/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01            -215                  06/26/13   07/22/13    EXCEL INSULATION CO INC             
                                                            04-06            -556                  06/28/13   07/19/13    Eastern Building and Restoration    
                                                            06-01              -3                  05/14/12     /  /      CAMPITO PLUMBING & HEATING INC      
                                                            07-02          -1,945                  06/26/13   07/26/13    JOHNSON CONTROLS                    
                                                            08-04          -2,480                  05/14/12   07/22/13    DIGESARE MECHANICAL INC             
                                                            09-05           1,941                  01/25/12     /  /      KASSELMAN ELECTRIC CO INC           
                                                            09-14             -24                  05/14/12     /  /      KASSELMAN ELECTRIC CO INC           
                                                            10-02           7,425                  01/25/12   04/11/12    TOTAL FACILITY SOLUTIONS INC        
                                                            16-01           2,700                  06/26/13   07/26/13    WAINSCHAF ASSOCIATES INC            
                                                            4-02            6,517                  01/25/12   08/22/12    EASTERN BUILDING AND RESTORATION    
 
07-1791   Reconstruction               0-007-012  03/25/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01         -50,176                  06/30/09   08/14/09    TITAN ROOFING INC                   
 
14-0085   Additions and Alterations    0-007-013  03/18/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-01               0          -2,138  11/30/16   04/27/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            03-01          -2,138                  12/19/16   01/06/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            04A-01           -518                  11/30/16   01/06/17    T. McElligott                       
                                                            13-01         164,691                  10/30/15   12/01/15    Plank Construction Co., Inc.        
                                                            13-04           2,163                  11/30/16   12/27/16    Plank Construction Co., Inc.        
                                                            13-08           7,122                  12/19/16   12/28/16    Plank Construction Co., Inc.        
                                                            13-3             -393                  11/30/16   12/27/16    Plank Construction Co., Inc.        
                                                            15E1A-01        1,612                  12/29/15   05/12/16    Kasselman electric Co., Inc.        
                                                            15E1A-02        1,831                  12/29/15   01/12/16    Kasselman Electric Co., Inc.        
                                                            15E1A-03        6,501                  12/29/15   01/12/16    Kasselman Electric Co., Inc.        
                                                            15E1A-04        1,689                  11/30/16   01/06/17    Kasselman Electric Co., Inc.        
                                                            15E1A-05        4,538                  11/30/16   01/06/17    Kasselman Electric Co., Inc.        
                                                            15E1A-07         -717                  12/19/16   01/06/17    Kasselman Electric Co., Inc.        
                                                            CO 13-07         -123                  12/19/16   01/06/17    PLANK CONSTRUCTION CO.,INC.         
 
21-0560   Reconstruction               0-007-014  05/10/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Advanced Technology Building:
14-0381   New Construction             0-013-001  04/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            B07-02              0                  05/31/16   06/06/16    JAMES H MALOY INC                   
                                                            B07-03          2,930                  03/06/17   03/30/17    James H. Maloy, Inc.                
                                                            B07-04        -18,330                  03/06/17   03/30/17    James H. Maloy, Inc.                
                                                            B07-05         -8,000                  03/13/17   03/30/17    James H. Maloy, Inc.                
                                                            B07-06          7,874                  03/13/17   03/30/17    James H. Maloy, Inc.                
                                                            B08-01        -33,325                  09/15/16   01/27/17    Bunkoff General Contractors, Inc.   
                                                            B08-01        -33,325                  03/03/16     /  /      Bunkoff General Contractors         
                                                            B08-02        -12,275                  09/15/16   10/27/16    Bunkoff General Contractors, inc.   
                                                            B08-03          7,700                  05/31/16   06/06/16    BUNKOFF GENERAL CONTRACTORS         
                                                            B08-04          8,799                  05/05/16   05/19/16    BUNKOFF GENERAL CONRACTORS          
                                                            B08-05          7,003                  05/31/16   06/10/16    BUNKOFF GENERAL CONTRACTORS         
                                                            B08-06          1,955                  05/31/16   06/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            B08-07            546                  06/28/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-08         15,066                  06/28/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-09         11,065                  06/28/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-10            446                  06/28/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-11         14,230                  07/01/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-12          6,127                  07/01/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-13        -25,750                  07/01/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-14          2,564                  07/01/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-15          3,254                  07/01/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-16         10,800                  07/01/16   10/05/16    Bunkoff General Contractors, Inc.   
                                                            B08-17          3,025                  07/01/16   12/04/17    Bunkoff General Contractors, Inc.   
                                                            B08-17          3,052                  11/16/17     /  /      Bunkoff General Contractors, Inc.   
                                                            B08-18          4,005                  07/01/16   07/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-19            546                  07/01/16   07/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-20          2,882                  08/04/16   10/07/16    Bunkoff General Contractors, Inc.   
                                                            B08-21         26,704                  08/04/16   10/07/16    Bunkoff General Contractors, Inc.   
                                                            B08-22         19,740                  08/04/16   10/07/16    Bunkoff General Contractors, Inc.   
                                                            B08-23         11,954                  08/04/16   10/07/16    Bunkoff General Contractors, Inc.   
                                                            B08-24            984                  08/04/16   10/07/16    Bunkoff General Contractors, Inc.   
                                                            B08-25            703                  08/04/16   10/07/16    Bunkoff General Contractors, Inc.   
                                                            B08-26            672                  08/04/16   10/07/16    Bunkoff General Contractors, Inc.   
                                                            B08-27          1,176                  09/15/16   10/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-28            920                  09/15/16   10/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-29         19,094                  10/11/16   10/26/16    Bunkoff General Contractors, Inc.   
                                                            B08-30         -6,619                  09/15/16   10/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-31          1,044                  09/15/16   10/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-32            414                  09/15/16   10/21/16    Bunkoff General Contractors, Inc.   
                                                            B08-33          1,073                  09/15/16   10/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-34          3,154                  10/11/16   10/26/16    Bunkoff General Contractors, Inc.   
                                                            B08-35          5,174                  10/11/16   10/26/16    Bunkoff General Contractors, Inc.   
                                                            B08-36          1,099                  10/11/16   10/26/16    Bunkoff General Contractors, Inc.   
                                                            B08-37            944                  10/11/16   10/26/16    Bunkoff General Contractors, Inc.   
                                                            B08-38            569                  10/11/16   10/26/16    Bunkoff General Contractors, Inc.   
                                                            B08-40        -10,000                  11/28/16   01/06/17    Bunkoff General Contractors, Inc.   
                                                            B08-41            935                  11/28/16   01/06/17    Bunkoff General Contractors, Inc.   
                                                            B08-42         -4,129                  12/02/16   12/27/16    Bunkoff General Contractors, Inc.   
                                                            B08-43          1,866                  01/05/17   01/09/17    Bunkoff General Contractors, Inc.   
                                                            B09-01        -26,448                  11/22/17   12/19/17    Condor Fire Sprinkler Co. LLC       
                                                            B09-39          1,343                  11/28/16   01/06/17    Bunkoff General Contractors, Inc.   
                                                            B10-01          4,583                  07/01/16   10/05/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-02          9,451                  07/01/16   10/05/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-03          1,079                  07/01/16   10/05/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-05          1,320                  07/13/16   10/06/16    TRI-VALLEY PLUMBING & HEATING       
                                                            B10-06          1,598                  07/13/16   10/06/16    TRI-VALLEY HEATING & PLUMBING       
                                                            B10-07            598                  08/04/16   10/07/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-08          5,196                  08/04/16   10/07/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-09          1,600                  11/14/16   11/22/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-10              0             671  11/14/16   01/09/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-11            615                  11/14/16   11/22/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-12            410                  02/13/17   02/16/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-13           -271                  05/08/17   05/10/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-4           1,401                  07/01/16   10/05/16    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-A8-1            0                  11/30/17   12/19/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-A8-2            0                  11/30/17   12/19/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-A8-3            0                  11/30/17   12/19/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-A8-4            0                  11/30/17   12/19/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-A8-5            0                  11/30/17   12/19/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B10-A8-6            0                  11/30/17   12/19/17    Tri-Valley Plumbing & Heating, Inc. 
                                                            B11-01         -1,647                  12/18/17   02/02/18    DiGesare Mechanical, Inc.           
                                                            B11-02           -149                  12/18/17   02/02/18    DiGesare Mechanical, Inc.           
                                                            B11-03        -46,079                  12/18/17   02/02/18    DiGesare Mechanical, Inc.           
                                                            B11-04          4,764                  12/04/17   12/19/17    DiGesare Mechanical, Inc.           
                                                            B11-A121            0                  11/30/17   12/14/17    DiGesare Mechanical, Inc.           
                                                            B11A12-2            0                  11/30/17   12/19/17    DiGesare Mechanical, Inc.           
                                                            B11A12-3            0                  11/30/17   12/19/17    DiGesare Mechanical, Inc.           
                                                            B11A12-4            0                  11/30/17   12/19/17    DiGesare Mechanical, Inc.           
                                                            B12-01          3,548                  07/01/16   10/05/16    A. E. Rosen Electrical              
                                                            B12-02          2,650                  07/01/16   10/05/16    A. E. Rosen Electrical              
                                                            B12-03          3,894                  07/13/16   10/05/16    A E ROSEN ELECTRICAL                
                                                            B12-04         41,010                  07/13/16   10/05/16    A E ROSEN ELECTRICAL                
                                                            B12-05          6,758                  07/13/16   10/06/16    A E ROSEN ELECTRICAL                
                                                            B12-06         22,320                  07/13/16   10/06/16    A E ROSEN ELECTRICAL                
                                                            B12-07          8,948                  08/04/16   10/07/16    A.E. Rosen Electrical               
                                                            B12-08         15,323                  08/04/16   10/07/16    A.E. Rosen Electrical               
                                                            B12-09          4,362                  09/15/16   10/27/16    A.E. Rosen Electrical               
                                                            B12-10          1,371                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-11            349                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-12            221                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-13          1,444                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-14            958                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-15            557                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-16          2,236                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-17            641                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-18          1,647                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-19          1,940                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-20          2,761                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-21            149                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-22          2,625                  03/06/17   04/13/17    A.E. Rosen Electrical               
                                                            B12-23          3,467                  05/12/17   06/23/17    A.E. Rosen Electrical               
                                                            B12-24          1,315                  05/12/17   06/23/17    A.E. Rosen Electrical               
                                                            B12-25         19,172                  07/10/17   07/14/17    A.E. Rosen Electrical               
                                                            B12-26          1,773                  07/10/17   07/14/17    A.E. Rosen Electrical               
                                                            B12-27          1,120                  07/10/17   07/14/17    A.E. Rosen Electrical               
                                                            B12-28          1,267                  07/10/17   07/14/17    A.E. Rosen Electrical               
                                                            B12-29        -15,497                  12/04/17   12/14/17    A.E. Rosen Electrical               
                                                            B12-30         11,745                  12/04/17   12/19/17    A.E. Rosen Electrical               
                                                            B12-A7-1            0                  11/30/17   12/19/17    A.E. Rosen Electrical               
                                                            B12-A7-1            0                  11/30/17   12/19/17    A.E. Rosen Electrical               
                                                            B12-A7-2            0                  11/30/17   12/19/17    A.E. Rosen Electrical               
                                                            B12-A7-3            0                  11/30/17   12/19/17    A.E. Rosen Electrical               
                                                            B12-A7-4            0                  11/30/17   12/19/17    A.E. Rosen Electrical               
                                                            B12-A7-5            0                  11/30/17   12/19/17    A.E. Rosen Electrical               
                                                            B12-A9-1            0                  11/30/17   12/19/17    A.E. Rosen Electrical               
                                                            B7-A5-01            0                  11/22/17   12/19/17    James H. Maloy, Inc.                
                                                            B7-A5-02            0                  11/22/17   12/19/17    James H. Maloy, Inc.                
                                                            B7-A5-03            0                  11/22/17   12/19/17    James H. Maloy, Inc.                
                                                            B7-A5-04            0                  11/22/17   02/13/18    James H. Maloy, Inc.                
                                                            B7-A5-05            0                  11/22/17   02/13/18    James H. Maloy, Inc.                
                                                            B7-A5-06            0                  11/22/17   02/13/18    James H. Maloy, Inc.                
                                                            B7-A5-07            0                  11/22/17   02/13/18    James H. Maloy, Inc.                
                                                            B7-A5-08            0                  11/22/17   02/13/18    James H. Maloy, Inc.                
                                                            B7-A5-09            0                  11/22/17   02/13/18    James H. Maloy, Inc.                
                                                            B7-A5-10            0                  11/22/17   02/13/18    James H. Maloy, Inc.                
                                                            B8-A1-01            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A2-01            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A2-02            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A3-01            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A3-02            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A3-03            0                  11/22/17   02/13/18    Bunkoff General Contractors         
                                                            B8-A3-04            0                  11/22/17   02/13/18    Bunkoff General Contractors         
                                                            B8-A3-05            0                  11/22/17   02/13/18    Bunkoff General Contractors         
                                                            B8-A3-06            0                  11/22/17   02/13/18    Bunkoff General Contractors         
                                                            B8-A3-07            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A3-08            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A3-09            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A3-10            0                  11/22/17   02/13/18    Bunkoff General Contractors, Inc.   
                                                            B8-A3-11            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-12            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-13            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-14            0         121,917  11/22/17   12/19/17    Bunkoff General Contractors, Inc.ne 
                                                            B8-A3-15            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-16            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-17            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-18            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-19            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-20            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B8-A3-21            0                  11/22/17   12/19/17    Bunkoff General Contractors, Inc.   
                                                            B9-A11-1            0                  11/22/17   12/19/17    Condor Fire Sprinkler Co. LLC       
                                                            B9-A11-2            0                  11/22/17   12/19/17    Condor Fire Sprinkler Co. LLC       
 
18-1928   Reconstruction               0-013-002  05/06/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0561   Reconstruction               0-013-003  05/10/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Shed Athletics:
95-1469   Reconstruction               2-006-001  06/04/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
90-1190   Reconstruction               5-002-003  04/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0379   Reconstruction               5-002-004  10/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0475   Additions and Alterations    5-002-006  02/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,577                  06/20/06   10/13/06    J Mc Bain                           
                                                            004             3,761                  03/31/06   12/12/07    collett mechanical                  
                                                            PL 001         -5,772                  10/29/07   11/14/07    MERIT PLUMBING AND HEATING LLC      
 
15-0063   Reconstruction               5-002-007  05/09/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            37-01          -5,500                  12/07/18   02/25/19    EMPIRE PAVING OF SCHENECTADY        
                                                            37-02          -1,000                  12/07/18   02/25/19    EMPIRE PAVING OF SCHENECTADY        
 

          New Bus Garage:
14-0382   New Construction             5-011-001  04/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            B27-01         28,790                  05/27/16   06/06/16    PLANK CONSTRUCTION CO               
                                                            B27-02         -1,917                  10/11/16   10/26/16    Plank Construction Co., Inc.        
                                                            B27-03         -1,247                  10/27/16   11/17/16    Plank Construction Co., Inc.        
                                                            B27-04         85,106                  05/08/17   05/10/17    Plank Construction Co., Inc.        
                                                            B27-05        -58,305                  12/04/17   12/14/17    PlankConstruction Co., Inc.         
                                                            B27A1-01            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-02            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-03            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-04            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-05            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-06            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-07            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-08            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-09            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-10            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-11            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-12            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-13            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B27A1-14            0                  11/30/17   12/19/17    Plank Construction Co., Inc.        
                                                            B29-01          6,400                  07/01/16   07/27/16    Eckert Mechanical Services Corp     
                                                            B29-02        -16,966                  11/22/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-01            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-02            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-03            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-04            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-05            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-06            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-07            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-08            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B29A1-09            0                  11/30/17   12/19/17    Eckert Mechanical Services Corp     
                                                            B30-01         48,400                  03/04/16   05/31/16    DiGesare Mechanical Inc             
                                                            B30-02        -46,777                  12/04/17   12/14/17    DiGesare Mechanical, Inc.           
                                                            B30A1-01            0                  11/22/17   12/19/17    DiGesare Mechanical, Inc.           
                                                            B30A1-02            0                  11/22/17   12/19/17    DiGesare Mechanical, Inc.           
                                                            B31-01          1,200                  05/13/16   05/31/16    FLEX ELECTRIC                       
                                                            B31-02           -711                  10/11/16   10/26/16    Flex Electric, LLC                  
                                                            B31-03         20,813                  01/05/17   01/09/17    Flex Electric, LLC                  
                                                            B31-04          1,445                  03/13/17   04/21/17    Flex Electric, LLC                  
                                                            B31-05        -28,943                  03/13/17   04/21/17    Flex Electric, LLC                  
                                                            B31-06          1,135                  05/12/17   06/23/17    Flex Electric, Inc.                 
                                                            B31-07          4,089                  07/10/17   07/14/17    Flex Electric, LLC                  
                                                            B31-08         -8,600                  11/27/17   12/19/17    Flex Electric, LLC                  
                                                            B31-09        -20,000                  12/04/17   12/19/17    Flex Electric, LLC                  
                                                            B31-A1-1            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-02            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-03            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-04            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-05            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-06            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-07            0                  11/30/17   12/19/17    Flex Electric, LLC                  
                                                            B31A1-08            0                  11/30/17   12/19/17    Flex Electric, LLC                  
                                                            B31A1-09            0                  11/30/17   12/19/17    Flex Electric, LLC                  
                                                            B31A1-10            0                  11/30/17   12/19/17    Flex Electric, LLC                  
                                                            B31A1-11            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-12            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-13            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-14            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-15            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-16            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-17            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-18            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-19            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-20            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-21            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-22            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A1-23            0                  11/30/17   12/14/17    Flex Electric LLC                   
                                                            B31A8-01            0                  11/22/17   12/19/17    Flex Electric, LLC                  
 

          XXDraper Athletic Facility-Sold 2020:
90-1191   Reconstruction               7-009-001  04/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0366   Reconstruction               7-009-002  10/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1605   Reconstruction               7-009-003  09/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
03-1303   New Construction             7-010-001  06/29/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                19                  02/08/06   07/21/06    Nast hatfield                       
 

          District-Wide:
95-1470   Reconstruction               7-999-001  06/04/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0478   Reconstruction               7-999-002  02/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001           -15,243                  01/17/06   01/24/08    Adirondack Cabling inc              
                                                            001             1,146                  05/24/06   09/29/06    Mitel Networks                      
                                                            001             1,653                  06/06/06   11/30/06    ronco Communications                
 

SCHENECTADY CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-06-00-01
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Central Park School:
91-1149   Reconstruction               0-002-003  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1210   Reconstruction               0-002-005  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0677   Reconstruction               0-002-006  03/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0428   Reconstruction               0-002-007  11/29/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0521   Reconstruction               0-002-008  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1044   Reconstruction               0-002-009  03/02/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-4            9,394                  05/19/10     /  /      MID STATE INDUSTRIES LTD            
 
08-1320   Additions and Alterations    0-002-010  07/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0024   Reconstruction               0-002-011  04/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-AC006       10,100                  07/21/17   08/11/17    Sullivan Contracting                
                                                            COAC-001        9,487                  05/16/17   06/23/17    Sullivan Contracting, Inc.          
                                                            COAC-002       14,124                  05/16/17   06/23/17    Sullivan Contracting, Inc.          
                                                            COAC-003       25,800                  05/16/17   06/23/17    Sullivan Contracting, Inc.          
                                                            COAC-004       19,873                  05/16/17   06/23/17    Sullivan Contracting, Inc.          
                                                            COAC-005       19,873                  05/16/17   06/23/17    Sullivan Contracting, Inc.          
                                                            COAC-008       11,245                  10/12/17   10/25/17    Sullivan Contracting                
                                                            COAC007        -9,617                  05/18/17   06/23/17    Sullivan Contracting                
                                                            COGC-004        8,210                  06/22/17   07/14/17    East Hatfield Construction, LLC     
                                                            COGC-005       13,870                  06/22/17   07/14/17    East Hatfield Construction, LLC     
                                                            COGC-006        4,775                  06/22/17   07/14/17    East Hatfield Construction, LLC     
                                                            COGC001        13,700                  05/18/17   06/23/17    Bast Hatfield Construction, LLC     
                                                            COGC002        15,137                  05/18/17   06/23/17    Bast Hatfield Construction, LLC     
                                                            COGC003         6,461                  05/18/17   06/23/17    Bast Hatfield Construction, LLC     
                                                            COPC-001          920                  10/12/17   10/31/17    BPI Piping                          
                                                            CoEC-001       -4,510                  03/20/18     /  /      Brownell Electric Corp.             
                                                            CoGC-001       -1,583                  03/20/18   03/22/18    Bonacquisti Brothers Construction   
                                                            CoGC-008       -3,379                  03/20/18   03/22/18    Bast Hatfield Construction, LLC     
                                                            CoGC007         7,375                  05/18/17   06/23/17    Bast Hatfield Construction, LLC     
                                                            CoHC-001      -11,501                  03/20/18   05/31/18    Family Danz Mechanical, LLC         
                                                            EC-01          -8,717                  02/19/19   02/27/19    SCHENECTADY HARDWARE AND ELECTRIC IN
                                                            EC-01          -8,717                  02/19/19     /  /      SCHENECTADY HARDWARE AND ELEC CO INC
 
16-0415   Reconstruction               0-002-012  10/19/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1871   Reconstruction               0-002-013  07/26/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          -5,452                  11/02/20   01/22/21    KASCON, LLC                         
                                                            AC-02          -5,451                  12/13/19   01/03/20    KASCON LLC                          
                                                            AC-02          -5,451                  07/22/21   12/21/21    Kascon LLC                          
                                                            AC-03          -2,224                  12/13/19   01/03/20    KASCON LLC                          
                                                            AC-04           5,574                  12/13/19   01/03/20    KASCON LLC                          
                                                            AC-05          -1,545                  12/13/19   01/03/20    KASCON LLC                          
                                                            AC-06         -10,000                  12/13/19   01/03/20    KASCON LLC                          
                                                            AC-06         -10,000                  04/06/21   05/05/21    KASCON, LLC                         
                                                            CoGC-001       -3,064                  03/20/18   03/22/18    Titan Roofing Inc.                  
                                                            GC-01          29,247                  02/19/19   02/25/19    LUPINI CONSTRUCTION INC             
                                                            GC02-03        61,797                  12/21/18   02/12/19    LUPINI CONSTRUCTION INC.            
                                                            PCO 020         5,452                  10/08/19   10/21/19    LUPINI CONSTRUCTION, INC.           
                                                            PCO 028       -10,000                  10/08/19   10/21/19    LUPINI CONSTRUCTION, INC.           
                                                            PCO 031          -692                  10/08/19   10/21/19    LUPINI CONSTRUCTION, INC.           
                                                            PCO 033         2,224                  10/08/19   10/21/19    LUPINI CONSTRUCTION, INC.           
                                                            PCO 034           -65                  10/08/19   10/21/19    LUPINI CONSTRUCTION, INC.           
 
20-0479   Reconstruction               0-002-014  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1937FP Reconstruction               0-002-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0042SC Visual Structural Inspection 0-002-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXElmer Ave. Sch-sold 122722Vacant/F:
91-1015   Reconstruction               0-003-002  04/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1592   Reconstruction               0-003-003  08/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0429   Reconstruction               0-003-004  11/29/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0813   Reconstruction               0-003-005  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0898   Reconstruction               0-003-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0191   Reconstruction               0-003-007  12/16/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            20              5,431                  04/17/02   05/10/02    Bunkoff General Contractors         
 
05-0965   Reconstruction               0-003-008  03/22/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            6,573                  05/26/09   08/14/09    EASTERN BUILDING & RESTORATIONS INC 
                                                            C2-2            6,956                  05/26/09   08/14/09    EASTERN BUILDING & RESTORATION INC  
                                                            C2-3            1,278                  05/26/09   08/14/09    EASTERN BUILDING AND RESTORATION INC
                                                            C2-6            5,470                  05/26/09   08/14/09    EASTERN BUILDING & RESTORATION INC  
                                                            C2-7            2,820                  05/26/09   08/14/09    EASTERN BUILDING AND RESTORATION    
                                                            C2-8            3,083                  05/26/09   08/14/09    EASTERN BUILDING AND RESTORATION    
                                                            C2-9            2,240                  05/26/09   08/14/09    EASTERN BUILDING AND RESTORATION    
                                                            C5-2            1,772                  05/26/09   08/14/09    FARINA ELECTRIC INC                 
 
04-0410   Reconstruction               0-003-009  04/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C3-1            2,030                  05/30/08   02/20/09    T Lemme Mechanical                  
                                                            C3-2            3,003                  05/30/08     /  /      T.Lemme Mechanical                  
                                                            C5-1            1,511                  05/30/08   02/20/09    Farina Electric                     
                                                            C5-3            1,057                  05/30/08   02/20/09    Farina Electric                     
 
12-0982   Reconstruction               0-003-011  04/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1048   Reconstruction               0-003-012  06/11/13  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1946FP Reconstruction               0-003-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fulton School (Lsd to BOCES):
97-0814   Reconstruction               0-006-001  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0892   Reconstruction               0-006-002  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0083   Reconstruction               0-006-003  08/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0964   Reconstruction               0-006-004  05/04/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1-1            9,976                  04/28/09   07/16/09    LVI ENVIRONMENTAL SERVICES          
                                                            C2-1            2,951                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-10          -7,600                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-2            2,718                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-3            1,520                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-4            2,437                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-5            3,366                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-6              640                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS         
                                                            C2-7            6,409                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-8            2,081                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-9            3,860                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C3-1            5,169                  04/28/09   09/23/09    WJV MECHANICAL INC                  
                                                            C3-2            5,617                  04/28/09   09/23/09    WJV MECHANICAL INC                  
                                                            C3-3           -2,800                  04/28/09   09/23/09    WJV MECHANICAL INC                  
                                                            C3-4            5,231                  04/28/09   09/23/09    WJV MECHANICAL INC                  
                                                            C3-5            8,682                  04/28/09   09/23/09    WJV MECHANICAL INC                  
                                                            C4-1           10,324                  04/28/09   09/23/09    MAZONE PLUMBING                     
                                                            C4-2            2,304                  04/28/09   09/23/09    MAZONE PLUMBING & HEATING INC       
                                                            C4-3            2,189                  04/28/09   09/23/09    MAZONE PLUMBING & HEATING INC       
                                                            C4-4              714                  04/28/09   09/23/09    MAZONE PLUMBING                     
                                                            C5-1            5,346                  04/28/09   09/23/09    BROWNELL ELECTRIC INC               
                                                            C5-2            3,786                  04/28/09   09/23/09    BORWNELL ELECTRIC INC               
                                                            C5-3              947                  04/28/09   10/01/09    BROWNELL ELECTRIC                   
                                                            C5-4            2,114                  04/28/09   12/03/09    BROWNELL ELECTRIC                   
                                                            C5-5            2,946                  04/28/09   09/23/09    BROWNELL ELECTRIC INC               
 
20-0480   Reconstruction               0-006-006  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hamilton School:
91-0923   Reconstruction               0-009-002  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0897   Reconstruction               0-009-004  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0196   Reconstruction               0-009-005  02/08/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10              3,446                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            11                -42                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            13              1,501                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            14              3,243                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            2-1           -17,391                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-11           12,731                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-12           30,029                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-13            8,562                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-14              413                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-16             -965                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-17            5,985                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-18              -62                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-2              -704                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-3            -5,871                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-4              -555                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-5              -310                  07/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-6              -511                  07/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-7              -659                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-9              -983                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            3-12              947                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            3-2               210                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            3-3             3,949                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            4                 314                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            4-5            -1,457                  06/24/04   07/21/04    Weisburgh Mech.                     
                                                            5                 772                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            5-2            22,126                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-3             6,543                  07/24/04   07/27/04    Brownell Elec.                      
                                                            5-4               328                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-5              -110                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-6             1,776                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-7             2,620                  06/24/04   07/27/04    Brownell Elec.                      
 
03-1583   Reconstruction               0-009-006  06/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  05/30/08   08/18/08    Lupini Masonry                      
                                                            001                 0                  05/30/08   08/18/08    Mid State industries                
                                                            002            16,750                  05/30/08   08/18/08    Lupini Masonry                      
                                                            002            13,663                  05/30/08   08/18/08    mid State indystries                
 
04-0956   Reconstruction               0-009-007  06/09/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C3-1            7,180                  05/30/08   09/29/08    Family danz Heating                 
                                                            C3-2            1,920                  05/30/08   09/29/08    Family Danz Heating                 
 
08-1280   Reconstruction               0-009-008  06/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            1,855                  06/30/11   07/15/11    EASTERN BUILDING & RESTORATION      
                                                            C2-2            4,814                  06/30/11   07/15/11    EASTERN BUILDING RESTORATION        
                                                            C3-1           -1,205                  06/30/11   07/15/11    DIGESARE MECHANICAL                 
                                                            C4-1            4,056                  06/30/11   07/15/11    COLLETT MECHANICAL INC              
                                                            C5-1            3,944                  06/30/11   07/15/11    J. MCBAIN ELECTRIC                  
                                                            C5-2            6,364                  06/30/11   07/15/11    J. MCBAIN INC                       
 
19-0930   Additions and Alterations    0-009-009  08/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0481   Reconstruction               0-009-010  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Howe School:
96-1287   Alterations                  0-011-003  12/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0457   Reconstruction               0-011-004  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0895   Reconstruction               0-011-005  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1297   Reconstruction               0-011-006  10/01/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1582   Reconstruction               0-011-007  06/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  05/30/08   08/18/08    Lupini Masonry                      
                                                            002            20,780                  05/30/08   08/18/08    Lupini Masonry                      
                                                            003            23,009                  05/30/08   08/18/08    Water Block Roofing and sheet metal 
 
04-0411   Reconstruction               0-011-008  04/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C3-2            3,003                  05/30/08   02/20/09    T. Lemme Mechanical Inc             
                                                            C3-3           10,700                  05/30/08     /  /      T. Lemme Mechanical inc             
                                                            C5-1            1,511                  05/30/08   02/20/09    Farina Electric                     
                                                            C5-2            3,500                  05/30/08   09/19/11    Farina Electric                     
 
04-1030   Reconstruction               0-011-009  06/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0672   Additions and Alterations    0-011-010  05/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-AC001        5,762                  07/21/17   07/28/17    Two Brother Contracting Inc.        
                                                            COAC-002       10,388                  09/01/17   11/24/17    Two Brother Contracting Inc.        
                                                            COAC-003       -1,696                  03/22/18   04/18/18    Two Brothers Contracting Inc.       
                                                            COEC-001       16,162                  09/01/17   11/24/17    Harold R. Clune Inc.                
                                                            COEC-002        6,914                  09/22/17   11/28/17    Harold R. Clune Inc.                
                                                            COEC-003        7,764                  03/22/18   04/06/18    Harold R. Clune Inc.                
                                                            COEC-004        1,381                  04/30/18   05/01/18    Harold R. Clune Inc.                
                                                            COGC-001       15,053                  03/22/18   04/18/18    Murnane Building Contractors, Inc.  
                                                            COGC-002       31,998                  03/22/18   04/18/18    Murnane Building Contractors, Inc.  
                                                            COGC-003       18,012                  03/22/18   04/18/18    Murnane Building Contractors, Inc.  
                                                            COGC-004       13,922                  03/22/18   04/18/18    Murnane Building Contractors, Inc.  
                                                            COGC-005       21,576                  03/22/18   03/29/18    Murnane Building Contractors, Inc.  
                                                            COGC-006       19,719                  03/22/18   03/29/18    Murnane Building Contractors, Inc.  
                                                            COGC-007       22,062                  03/22/18   03/29/18    Murnane Building Contractors, Inc.  
                                                            COGC-008       20,212                  03/22/18   03/29/18    Murnane Building Contractors, Inc   
                                                            COGC-009       34,014                  03/22/18   03/29/18    Murnane Building Contractors, Inc   
                                                            COGC-010       11,527                  03/22/18   03/29/18    Murnane Building Contractors, Inc   
                                                            COGC-011       18,693                  03/22/18   03/29/18    Murnane Building Contractors, Inc.  
                                                            COGC-012       27,325                  03/22/18   03/29/18    Murnane Building Contractors, Inc.  
                                                            COHC-001       17,211                  09/01/17   11/24/17    T. Lemme Mechanical Inc.            
                                                            COHC-002       -9,759                  03/22/18   04/06/18    T. Lemme Mechanical, Inc.           
                                                            COPC-001        4,087                  06/22/17   07/14/17    Tri-Valley Plumbing & Heating Inc.  
                                                            COPC-002        1,414                  03/22/18   04/06/18    Tri-Valley Plumbing & Heating Inc   
                                                            COPC-003         -423                  03/22/18   04/06/18    Tri-Valley Plumbing & Heating Inc.  
 
20-0482   Reconstruction               0-011-011  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1944FP Reconstruction               0-011-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lincoln School ES:
91-1016   Reconstruction               0-012-002  04/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1595   Reconstruction               0-012-003  08/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1178   Reconstruction               0-012-004  05/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0816   Reconstruction               0-012-005  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0891   Reconstruction               0-012-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0966   Reconstruction               0-012-007  03/22/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-4            2,792                  05/26/09   10/07/09    EASTERN BUILDING AND RESTORATION INC
                                                            C2-5            3,715                  05/26/09   08/14/09    EASTERN BUILDING & RESTORATION INC  
                                                            C3-1            6,100                  05/26/09   08/14/09    FAMILY DANZ HEATING & A/C INC       
                                                            C3-2            9,095                  05/26/09   08/14/09    FAMILY DANZ HEATING & A/C           
                                                            C5-1              417                  05/26/09     /  /      FARINA ELECTRIC INC                 
                                                            C5-2              537                  05/26/09   08/14/09    FARINA ELECTRIC INC                 
 
17-1518   Reconstruction               0-012-009  02/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -9,866                  02/24/21   04/05/21    STILSING ELECTRIC, INC.             
                                                            EC-002        -17,375                  02/24/21   04/05/21    STILSING ELECTRIC, INC.             
                                                            EC-003          1,596                  02/24/21   04/05/21    STILSING ELECTRIC, INC.             
                                                            GC-002         -3,000                  01/14/21   06/15/21    MID-STATE INDUSTRIES, LTD.          
                                                            PC-001         -1,869                  01/14/21   03/16/21    TRI-VALLEY PLUMBING & HEATING, INC. 
 
17-1738   Reconstruction               0-012-010  06/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC001          17,457                  12/21/18   02/06/19    ECKERT MECHANICAL LLC               
                                                            MC002          21,782                  12/21/18   02/06/19    ECKERT MECHANICAL LLC               
 
20-0483   Reconstruction               0-012-011  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1697   Reconstruction               0-012-012  05/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-001          3,412                  06/26/23   12/29/23    RMB MECHANICAL                      
                                                            MC-002          8,750                  06/26/23   12/29/23    RMB MECHANICAL                      
                                                            MC-003            910                  06/26/23   12/29/23    RMB MECHANICAL                      
                                                            MC-004        -10,000                  06/26/23   12/29/23    RMB MECHANICAL                      
 

          Schenectady High School:
90-0772   Additions and Alterations    0-013-002  03/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0678   Reconstruction               0-013-004  03/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0894   Reconstruction               0-013-005  02/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1177   Reconstruction               0-013-006  05/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0399   Reconstruction               0-013-007  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0493   Additions and Alterations    0-013-009  03/21/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004           4,724                  04/22/04   04/28/04    Bunkoff General Contractors         
                                                            00005           4,773                  04/22/04   04/28/04    Bunkoff General Contractors         
                                                            1               4,504                  03/05/02   04/18/02    Scholastic Furniture                
                                                            1                -159                  11/03/00   11/03/00    ARCON Construction                  
                                                            1              61,067                  11/03/00   11/03/00    Bast Hatfield, Inc                  
                                                            10                  0                  06/17/02   07/10/02    Campito Plumbing                    
                                                            11             10,195          10,195  04/22/04   Disapproved Campito Plumbing                    
                                                            13             24,638                  12/20/01   03/08/02    Bast Hatfield                       
                                                            13            163,013         139,000  12/20/01   12/02/03    Arcon Const.                        
                                                            14             15,281                  12/20/01   03/08/02    Arcon Const.                        
                                                            15             18,221                  12/20/01   03/08/02    Arcon Const.                        
                                                            15             16,324                  12/20/01   03/25/02    Bast Hatfield                       
                                                            16             29,799                  12/20/01   03/08/02    Bast Hatfield                       
                                                            16             17,762                  03/05/02   04/18/02    Arcon Const.                        
                                                            17             26,997                  12/20/01   03/08/02    Bast Hatfield                       
                                                            17              6,816                  03/05/02   04/18/02    Arcon Const.                        
                                                            18                872                  03/05/02   04/18/02    Bast Hatfield                       
                                                            18             20,575                  04/16/02   05/10/02    Arcon Const.                        
                                                            19              3,695                  03/05/02   04/18/02    Bast Hatfield                       
                                                            2              -1,685                  12/20/01   03/08/02    Jupiter Environ.                    
                                                            2              23,395                  03/05/02   04/18/02    Monahan & Loughlin                  
                                                            20             22,528                  04/16/02   05/10/02    Bast Hatfield                       
                                                            21             -6,400                  06/17/02   07/10/02    Bast Hatfield                       
                                                            22              8,356                  04/16/02   05/10/02    Bast Hatfield                       
                                                            23              9,519                  06/17/02   07/10/02    Bast Hatfield                       
                                                            24             18,375                  04/16/02   05/10/02    Bast Hatfield                       
                                                            3               1,508                  06/13/01   02/06/02    Campito Plumbing                    
                                                            3                 303                  03/05/02   04/18/02    DiGesare Mech.                      
                                                            3               3,906           3,906  04/22/04   Disapproved Monahan & Loughlin                  
                                                            4              11,466                  04/16/02   05/10/02    DiGesare Mech.                      
                                                            5               3,345                  04/22/04   04/28/04    DiGesare Mech.                      
                                                            7              66,753                  07/08/01   01/08/02    Bast Hatfield                       
                                                            7              16,696                  12/20/01   03/08/02    Campito Plumbing                    
                                                            8              10,997                  06/13/01   02/06/02    Arcon Const.                        
                                                            8               3,847                  12/20/01   03/25/02    Campito Plumbing                    
                                                            9              25,364                  06/13/01   02/06/02    Arcon Const.                        
                                                            9                 640                  03/05/02   04/18/02    Campito Plumbing                    
 
99-1298   Reconstruction               0-013-010  10/01/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1586   Reconstruction               0-013-011  06/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C6-1            2,104                  05/30/08   08/07/08    Water block Roofing and sheet metal 
 
04-0407   Reconstruction               0-013-012  12/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,500                  05/30/08   08/04/08    Indoor air technologies.inc         
 
04-1065   Reconstruction               0-013-013  06/02/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1           36,662                  05/26/09   08/14/09    EASTERN BUILDING AND RESTORATION    
                                                            C2-2           21,294                  05/26/09   08/14/09    EASTERN BUILDING & RESTORATION      
                                                            C2-3            2,288                  05/26/09   08/14/09    EASTERN BUILDING & RESTORATION INC  
                                                            C3-4            3,054                  05/26/09   08/11/09    T. LEMME MECHANICAL INC             
                                                            C5-4            9,495                  05/26/09   07/01/10    FARINA ELECTRIC INC                 
                                                            C6-1            9,960                  05/26/09   08/31/09    MONAHAN & LOUGHLIN INC              
                                                            C6-2            1,910                  05/26/09   08/31/09    MONAHAN & LOUGHLIN INC              
                                                            C6-3            6,902                  05/26/09   08/31/09    MONAHAN & LOUGHLIN INC              
 
08-0237   Additions and Alterations    0-013-015  04/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1607   Reconstruction               0-013-017  05/19/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            1,240                  06/30/11   07/18/11    CAVALIER FLOORING INC               
                                                            C2-2           35,700                  06/30/11   07/18/11    CAVALIER FLOORING INC               
                                                            C2-3            5,400                  06/30/11   07/18/11    CAVALIER FLOORING INC               
                                                            C2-4           32,975                  06/30/11   07/18/11    CAVALIER FLOORING INC               
 
12-0133   Reconstruction               0-013-018  01/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0006   Reconstruction               0-013-019  07/11/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  05/24/13   07/19/13    Martin Envirobmental Services, Inc. 
                                                            GC-002              0                  05/24/13   07/19/13    Martin Envirobmental Services, Inc. 
                                                            GC-003              0                  05/24/13   07/19/13    Martin Envirobmental Services, Inc. 
 
15-0282   Reconstruction               0-013-020  09/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1572   Reconstruction               0-013-021  04/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          29,549                  09/06/19   09/10/19    A-TECH GROUP LLC                    
                                                            AC-02          31,645                  12/02/20   02/01/21    A-TECH GROUP, LLC                   
                                                            AC-02          31,645                  10/12/21   08/16/22    A-Tech Group LLC                    
                                                            AC-02          31,645                  10/12/21   11/18/22    A-Tech Group LLC                    
                                                            AC-02          31,645                  10/15/21   11/18/22    A-Tech Group LLC                    
                                                            AC-03          31,645                  11/02/21   12/07/22    A-Tech Group LLC                    
                                                            AC-04         -10,000                  10/12/21   08/16/22    A-Tech Group LLC                    
                                                            AC-04         -10,000                  10/15/21   12/07/22    A-Tech Group, LLC                   
                                                            AC-04         -10,000                  11/02/21   11/18/22    A-Tech Group LLC                    
                                                            CC-01           3,247                  03/09/20   06/29/20    TECHNICAL BUILDING SERVICES         
                                                            CC-02           4,309                  03/09/20   07/02/20    TECHNICAL BUILDING SERVICES         
                                                            CC-03           2,089                  07/24/20   10/26/20    TECHNICAL BUILDING SERVICES         
                                                            CC-03          65,696                  09/29/20   11/05/20    TRI-VALLEY PLUMBING AND HEATING,INC.
                                                            CC-03           2,089                  10/12/21   11/18/22    Technical Bldg Services             
                                                            CC-04           2,362                  07/24/20   10/26/20    TECHNICAL BUILDING SERVICES         
                                                            CC-04           2,362                  10/21/12   11/18/22    Technical Bldg Services             
                                                            CC-05           1,640                  12/02/20   02/01/21    TECHNICAL BUILDING SERVICES         
                                                            CC-05           1,640                  10/12/21   11/18/22    Technical Bldg Services             
                                                            CC-06           2,283                  10/12/21   12/02/22    Technical Bldg Services             
                                                            EC-01          23,288                  12/13/19   12/26/19    J. MCBAIN, INC.                     
                                                            EC-02           5,669                  12/02/20   02/01/21    J. MCBAIN, INC.                     
                                                            EC-02           5,669                  10/12/21   11/18/22    J McBain, Inc                       
                                                            EC-03           4,390                  12/02/20   02/01/21    J. MCBAIN, INC.                     
                                                            EC-03           4,390                  10/12/21   11/18/22    J McBain, Inc                       
                                                            EC-04          10,331                  12/02/20   02/01/21    J. MCBAIN, INC.                     
                                                            EC-04          10,331                  10/12/21   11/18/22    J McBain, Inc                       
                                                            EC-05           5,204                  12/02/20   02/01/21    J. MCBAIN, INC.                     
                                                            EC-05           5,204                  10/12/21   11/18/22    J McBain, Inc                       
                                                            EC-06           4,784                  10/12/21   11/18/22    J McBain, Inc                       
                                                            EC-07           6,006                  10/12/21   11/18/22    J McBain, Inc                       
                                                            EC-08             982                  10/12/21   11/18/22    J McBain, Inc                       
                                                            GC-01          -1,733                  07/24/20   09/22/20    PLANK, LLC                          
                                                            GC-01          -1,733                  10/12/21   12/02/22    Plank, LLC                          
                                                            GC-02         -11,163                  12/02/20   05/07/21    PLANK, LLC                          
                                                            GC-02         -11,164                  10/12/21   12/02/22    Plank, LLC                          
                                                            MC-01         -53,383                  10/12/21   11/18/22    Crisafuli Bros Plumb&Heat Contractor
                                                            PC-01          65,696                  10/12/21   11/18/22    Tri-Valley Plumb&Heat, Inc          
                                                            PC-02           9,729                  06/12/20   07/20/20    Tri-Valley Plumbing                 
                                                            PC-02           9,779                  10/12/21   11/18/22    Tri-Valley Plumb&Heat, Inc          
                                                            PC-03           1,238                  12/02/20   11/18/22    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-03           1,238                  10/12/21     /  /      Tri-Valley Plum&Heat, Inc           
                                                            PC-04          -3,475                  12/11/20   02/25/21    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-05           1,818                  01/25/21   04/05/21    TRI-VALLEY PLUMBING & HEATING, INC. 
 
17-1832   Reconstruction               0-013-022  06/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01           5,476                  12/21/18   02/11/19    SULLIVAN CONYTACTING                
                                                            AC-02          14,248                  02/11/19   03/15/19    SULLIVAN CONTRACTING                
 
19-1729   Reconstruction               0-013-023  05/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0352   Reconstruction               0-013-024  12/02/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0484   Reconstruction               0-013-025  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0599   Reconstruction               0-013-026  01/31/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -1,460                  06/07/23   01/02/24    AKROS MGMT                          
                                                            MC-01         -10,265                  06/14/23   12/28/23    RMB MECHANICAL                      
 
22-1099   Reconstruction               0-013-027  02/15/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1809   Reconstruction               0-013-028  06/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1945FP Reconstruction               0-013-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1291MD Reconstruction               0-013-MD1  03/18/04  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1268SC Visual Structural Inspection 0-013-SC1  02/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0035SC Visual Structural Inspection 0-013-SC2  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Steinmetz School:
93-0457   Reconstruction               0-014-002  01/21/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0469   Reconstruction               0-014-003  04/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0679   Reconstruction               0-014-004  03/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0458   Reconstruction               0-014-005  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0899   Reconstruction               0-014-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0938   Reconstruction               0-014-007  10/04/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            2,682                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-10           2,581                  04/28/10   08/05/10    BUNKOFF GENERAL MECHANICAL INC      
                                                            C2-11           6,982                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-12             649                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-13           4,294                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-14          15,647                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-15          23,984                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-2              464                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-3           11,322                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-4            3,129                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-5           20,817                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-6            4,772                  04/28/10   08/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-7            3,279                  04/28/10   08/05/10    BUNKOFF GENERAL MECHANICAL INC      
                                                            C2-8           10,175                  04/28/10   08/05/10    BUNKOFF GENERAL MECHANICAL INC      
                                                            C2-9            8,976                  04/28/10   08/05/10    BUNKOFF GENERAL MECHANICAL INC      
                                                            C3-1            6,370                  04/28/10   08/05/10    MAZONE PLUMBING                     
                                                            C3-2            2,567                  04/28/10   08/05/10    MAZONE PLUMBING AND HEATING INC     
                                                            C5-1              667                  04/28/10   08/05/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-2              726                  04/28/10   08/05/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-3            1,951                  04/28/10   08/05/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-4            2,171                  04/28/10   08/05/10    KASSELMAN ELECTRIC CO INC           
 
08-1606   Reconstruction               0-014-008  05/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1             -765                  06/30/11   09/09/11    W.B. ROOFING                        
 
13-1624   Reconstruction               0-014-009  07/02/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AIA-GC-2         -201                  03/04/16   03/16/16    Bast Hatfield Construction LLC      
                                                            AIAEC-01       -5,993                  03/04/16   01/06/17    Kasselmen Electric                  
                                                            EC-001        -23,412                  05/06/16   05/19/16    HAROLD R CHASE                      
                                                            GC-001          7,230                  06/22/17   07/14/17    Bast Hatfield Construction LLC      
                                                            GC-003        -20,319                  05/05/16   05/19/16    BAST HATFIELD                       
                                                            GC-01          25,408                  08/08/16     /  /      Bast Hatfield Construction LLC      
                                                            GC-02           1,207                  08/08/16     /  /      Bast Hatfield Construction LLC      
                                                            HC-001        -23,338                  05/05/16   05/19/16    DIGESARE MECHANICAL                 
                                                            PC-001         -2,947                  05/05/16   05/19/16    TRI-VALLEY PLUMBING & HEATING       
 
20-0485   Reconstruction               0-014-010  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1936FP Reconstruction               0-014-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0045SC Visual Structural Inspection 0-014-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mont Pleasant Middle School:
90-1562   Additions and Alterations    0-015-002  06/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1402   Reconstruction               0-015-004  07/26/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0458   Reconstruction               0-015-006  01/21/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0470   Reconstruction               0-015-007  04/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0459   Reconstruction               0-015-008  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0903   Reconstruction               0-015-009  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1136   Reconstruction               0-015-011  07/01/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C3-1            5,893                  05/26/09   08/11/09    T. LEMME MECHANICAL INC             
                                                            C6-1           11,070                  05/26/09   08/31/09    TITAN ROOFING INC                   
                                                            C7B-1          -2,300                  05/26/09   08/14/09    WINDOW REPAIR SYSTEMS               
 
11-1279   Reconstruction               0-015-012  05/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0257   Reconstruction               0-015-013  02/08/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-001          6,242                  01/06/17   08/29/17    Flex Electric Constructors Inc      
                                                            EC-002          6,929                  01/06/17   08/29/17    Flex Electrical Constructors Inc    
                                                            EC-003         -4,656                  01/06/17   08/29/17    Flex Electrial Constructors Inc     
 
12-0168   Reconstruction               0-015-014  02/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0961   Reconstruction               0-015-015  05/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01          33,560                  03/04/16   03/24/16    Martin Envitonmental Services, Inc. 
                                                            AA-02          28,809                  03/04/16   03/24/16    Martin Environmental Services, Inc. 
                                                            AA-03          26,394                  03/04/16   03/24/16    Martin Environmental Services, Inc. 
                                                            AA-04          26,394                  03/04/16   03/24/16    Martin Environmental Services, Inc. 
                                                            AA-05          58,983                  04/20/16   05/10/16    Martin Environmental Services, Inc. 
                                                            AA-06          41,785                  10/19/16   11/01/16    Martin Environmental Services, Inc. 
                                                            AA-07           7,163                  03/29/17   06/19/17    Martin Environmental Services, Inc. 
                                                            AA-08          25,367                  03/29/17   06/19/17    Martin Environmental Services, Inc. 
                                                            AA-09          20,723                  07/26/17   07/31/17    Martin Environmental Services, Inc. 
                                                            AA-10          22,503                  07/24/17   08/10/17    Martin Environmental Services, Inc. 
                                                            AA-11          25,234                  08/25/17   10/10/17    Martin Environmental Services, Inc. 
                                                            AA-12            -400                  04/23/18   04/25/18    Martin Environmental Services, Inc. 
                                                            EC-01          28,782                  10/19/16   11/01/16    Harold R. Clune, Inc.               
                                                            EC-02          29,363                  10/19/16   11/01/16    Harold R. Clune, Inc.               
                                                            EC-03          33,990                  04/10/17   05/13/19    Harold R. Clune, Inc.               
                                                            EC-04          34,073                  04/10/17   05/13/19    Harold R. Clune, Inc.               
                                                            EC-05          13,781                  04/10/17   06/05/17    Harold R. Clune, Inc.               
                                                            EC-06          23,815                  05/22/17   06/02/17    Harold R. Clune, Inc.               
                                                            EC-07          29,159                  05/22/17   06/02/17    Harold R. Clune, Inc.               
                                                            EC-08           3,534                  08/07/17   10/25/17    Harold R. Clune, Inc.               
                                                            EC-09          15,721                  01/04/18   03/19/18    Harold R. Clune                     
                                                            EC-10           3,123                  04/20/18   06/01/18    Harold R. Clune, Inc.               
                                                            GC-01          28,965                  12/12/16   12/15/16    Bast Hatfield Construction LLC      
                                                            GC-02          27,130                  12/12/16   12/15/16    Bast Hatfield Construction LLC      
                                                            GC-03          16,400                  12/12/16   12/15/16    Bast Hatfield Construction LLC      
                                                            GC-04          33,121                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-05          30,214                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-06           6,389                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-07          22,068                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-08          31,152                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-09          34,977                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-10          28,360                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-11          30,778                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-12          33,411                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-13          23,671                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-14           6,750                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-15          11,642                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-16          27,556                  03/29/17   06/19/17    Bast Hatfield Construction, LLC     
                                                            GC-17          22,379                  04/10/17   05/15/17    Bast Hatfield Construction LLC      
                                                            GC-18          14,421                  04/20/17   05/12/17    Bast Hatfield Construction LLC      
                                                            GC-19          27,743                  04/20/17   05/12/17    Bast Hatfield Construction LLC      
                                                            GC-20          12,831                  04/20/17   05/12/17    Bast Hatfield Construction LLC      
                                                            GC-21          14,078                  04/20/17   05/12/17    Bast Hatfield Construction LLC      
                                                            GC-22          19,079                  04/20/17   05/12/17    Bast Hatfield Construction LLC      
                                                            GC-23          16,462                  04/20/17   05/12/17    Bast Hatfield Construction LLC      
                                                            GC-24          17,455                  05/22/17   06/14/17    Bast Hatfield COnstruction LLC      
                                                            GC-25          24,804                  08/07/17   08/10/17    Bast Hatfield Construction LLC      
                                                            GC-26           6,599                  08/25/17   10/10/17    Bast Hatfield Construction LLC      
                                                            GC-27          10,454                  08/25/17   10/10/17    Bast Hatfield Construction LLC      
                                                            GC-28          29,443                  09/18/17   10/13/17    Bast Hatfield Construction LLC      
                                                            GC-29          24,516                  09/18/17   10/13/17    Bast Hatfield Construction LLC      
                                                            GC-30          17,455                  09/18/17   10/13/17    Bast Hatfield Construction LLC      
                                                            GC-31          23,034                  10/16/17   10/25/17    Bast Hatfield Construction LLC      
                                                            GC-32          24,038                  01/08/18   01/26/18    Bast Hatfield Construction LLC      
                                                            GC-33          19,319                  10/16/17   10/25/17    Bast Hatfield Construction LLC      
                                                            GC-34          34,359                  01/04/18   01/25/18    BAST HATFIELD                       
                                                            GC-35          30,220                  02/05/18   02/21/18    Bast Hatfield Construction LLC      
                                                            GC-36          20,807                  02/05/18   02/21/18    Bast Hatfield Construction LLC      
                                                            GC-37          33,057                  03/26/18   03/29/18    Bast Hatfield Construction LLC      
                                                            GC-38          25,968                  03/26/18   03/29/18    Bast Hatfield Construction LLC      
                                                            GC-39         -46,821                  04/23/18   04/25/18    Bast Hatfield Construction LLC      
                                                            HC-01         -32,629                  04/20/18   06/01/18    E.W. Tompkins Company, Inc.         
                                                            PC-01          19,496                  10/19/16   11/01/16    DiGesare Mechanical, Inc.           
                                                            PC-02          21,408                  04/10/17   06/05/17    DiGesare Mechanical, Inc.           
                                                            PC-03           7,033                  05/04/18   06/04/18    DiGesare Mechanical, Inc.           
                                                            PC-04          34,498                  01/08/18   05/13/19    DiGesare Mechanical, Inc.           
                                                            PC-05            -732                  04/23/18   06/04/18    DiGesare Mechanical, Inc.           
 
19-0040   Reconstruction               0-015-017  02/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0623   Reconstruction               0-015-018  12/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           1,389                  11/02/21   12/09/22    George Martin and Sons              
                                                            EC-02             817                  10/07/21   11/22/22    George Martin and Sons              
                                                            GC-01          57,520                  10/07/21   11/22/22    Upstate Companies I, LLC            
                                                            GC-02           2,339                  10/07/21   11/22/22    Upstate Companies I, LLC            
                                                            GC-03          28,896                  10/07/21   11/16/22    Upstate Companies I, LLC            
                                                            GC-04           4,023                  10/07/21   07/26/22    Upstate Comapanies I, LLC           
                                                            MC-01          10,798                  01/25/21   03/31/21    JOHN W. DANFORTH CO.                
                                                            MC-01          10,798                  10/07/21   11/16/22    John Danforth Company               
                                                            MC-02             737                  10/07/21   11/17/22    John Danforth Company               
                                                            MC-03           2,159                  10/07/21   11/17/22    John Danforth Company               
 
19-1865   Reconstruction               0-015-019  01/24/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01           8,289                  10/07/21   11/22/22    Neoplanta Restoration, Inc          
                                                            EC-01          11,669                  10/07/21   11/22/22    J McBain Inc                        
                                                            EC-02           2,767                  11/02/21   12/09/22    J McBain, Inc                       
                                                            GC-01          13,508                  11/02/21   12/07/22    Mid-State Industries, Ltd           
                                                            GC-02           3,368                  11/02/21   12/07/22    Mid-State Industries, Ltd           
                                                            GC-03           1,294                  05/13/22   04/20/23    Mid-State Indust Inc                
                                                            GC-03           1,294                  05/13/22     /  /      Mid-State Indust Inc                
                                                            MC-01           8,423                  11/02/21   12/09/22    RMB Mech Inc                        
                                                            PC-01            -668                  01/19/22   11/08/22    Mazone Plumb&Heat Inc               
                                                            PC-01            -668                  01/19/22   11/08/22    Mazone Plumb&Heat Inc               
 
20-0486   Reconstruction               0-015-020  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2079FA Reconstruction               0-015-021  08/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Oneida School:
92-1211   Reconstruction               0-017-004  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1286   Reconstruction               0-017-005  12/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0460   Reconstruction               0-017-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0894   Reconstruction               0-017-007  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0192   Reconstruction               0-017-008  12/16/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            19              8,349                  04/17/02   05/10/02    Bunkoff General Contractors         
 
98-1488   Reconstruction               0-017-009  08/11/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0790   Reconstruction               0-017-010  08/07/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-2            2,227                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-4          -93,088                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-5            1,676                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-6            3,903                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C5-1            2,078                  04/28/09   07/16/09    BROWNELL ELECTRIC INC               
 
09-1430   Reconstruction               0-017-011  06/21/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            C2-04          12,000                  06/29/12   12/12/12    Bunkoff General Contractors         
                                                            C2-1            2,000                  06/29/12   12/12/12    Bunkoff General Contractors         
                                                            C2-2             -395                  06/29/12   12/12/12    Bunkoff General Contractors         
                                                            C2-3            5,917                  06/29/12   12/12/12    Bunkoff General Contractors         
                                                            C4-1              501                  06/29/12   12/12/12    DiGeasre Mechanical Inc.            
                                                            C5-1            5,453                  06/29/12   12/12/12    Kasselmen Electric                  
                                                            C5-2            4,938                  06/29/12   12/12/12    Kasselmen Electric                  
                                                            C5-3            1,062                  06/29/12   12/12/12    Kasselmen Electric                  
                                                            C5-4            1,211                  06/29/12   12/12/12    Kesselmen Electric                  
 
10-1273   Reconstruction               0-017-012  05/16/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0970   Reconstruction               0-017-013  05/20/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          -8,360                  08/03/16   09/30/16    A-Tech Group LLC                    
                                                            AC-02               0                  08/03/16   09/30/16    A-Tech Group LLC                    
                                                            EC-01          73,418                  06/01/18   06/29/18    Schenectady Hardware & Electric     
                                                            EC-02               0                  06/28/18     /  /      SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            GC-01          36,622                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-02          14,753                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-03          32,332                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-04          32,945                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-05           6,872                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-06           9,939                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-07           5,492                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-08           5,627                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-09           3,613                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-10          14,196                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-11           3,492                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-12          15,955                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-13          20,309                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-14          14,698                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-15          19,200                  11/25/16   12/13/16    Murnane Building Contractors, Inc.  
                                                            GC-16          30,912                  11/25/16   12/13/16    Murnane Building Contractors, Inc.  
                                                            GC-17          17,292                  11/25/16   12/13/16    Murnane Building Contractors, Inc.  
                                                            GC-18          25,253                  03/29/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-19          10,994                  03/29/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-20           2,242                  03/29/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-21           4,702                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-22           8,156                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-23          18,656                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-24          10,363                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-25          24,782                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-26          33,840                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-27           6,189                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-28          13,127                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-29           5,365                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-30           3,267                  04/10/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-31           8,667                  03/29/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-32           3,407                  03/29/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-33           2,530                  03/29/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-34          34,290                  03/29/17   05/16/17    Murnane Building Contractors, Inc.  
                                                            GC-35           3,506                  04/10/17   06/01/17    Murnane Building Contractors, Inc.  
                                                            GC-36          18,893                  04/10/17   06/01/17    Murnane Building Contractors, Inc.  
                                                            GC-37          18,807                  04/10/17   06/01/17    Murnane Building Contractors, Inc.  
                                                            GC-38           8,157                  04/10/17   06/01/17    Murnane Building Contractors, Inc.  
                                                            GC-39           5,802                  04/10/17   05/22/17    Murnane Building Contractors, Inc.  
                                                            GC-40           6,592                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-41          34,482                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-42           7,022                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-43           3,344                  04/10/17   05/15/17    Murnane Building Contractors, Inc.  
                                                            GC-44          13,328                  06/16/17   09/14/17    Murnane Building Contractors, Inc.  
                                                            GC-45          27,212                  06/16/17   09/14/17    Murnane Building Contractors, Inc.  
                                                            GC-46          33,890                  10/16/17   11/08/17    Murnane Building Contractors, Inc.  
                                                            GC-47          31,599                  10/16/17   11/08/17    Murnane Building Contractors, Inc.  
                                                            GC-48          10,590                  10/16/17   11/08/17    Murnane Building Contractors, Inc.  
                                                            GC-49           3,501                  10/16/17   11/08/17    Murnane Building Contractors, Inc.  
                                                            GC-50           5,037                  03/26/18   03/29/18    Murnane Building Contractors, Inc.  
                                                            GC-51           3,455                  03/26/18   03/29/18    Murnane Building Contractors, Inc.  
                                                            GC-52          13,878                  04/23/18   05/11/18    Murnane Building Contractors, Inc.  
                                                            GC-53          33,504                  06/01/18     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-53          33,504                  07/06/18   09/12/18    MURNANE BUILDING CONTRACTORS INC    
                                                            GC-54               0                  07/16/18   07/31/18    MURNANE BUILDING CONTRACTORS INC    
                                                            GC-55         -18,000                  01/18/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            HC-01         -35,300                  05/22/17   06/26/17    T. Lemme Mechanical, Inc.           
                                                            PC-01          26,742                  08/01/16   09/30/16    Mazone Plumbing and Heating, Inc.   
                                                            PC-02          21,751                  08/01/16   09/30/16    Mazone Plumbing and Heating, Inc.   
                                                            PC-03          32,716                  08/01/16     /  /      Mazone Plumbing and Heating, Inc.   
                                                            PC-04          13,039                  08/03/16   09/30/16    Mazone Plumbing and Heating, Inc.   
                                                            PC-05          20,866                  11/25/16   01/06/17    Mazone Plumbing and Heating, Inc.   
                                                            PC-06           8,039                  04/27/17   05/10/17    Mazone Plumbing and Heating, Inc.   
                                                            PC-07           2,245                  04/27/17   05/10/17    Mazone Plumbing and Heating, Inc.   
                                                            PC-08           1,586                  03/29/17   04/12/17    Mazone Plumbing & Heating, Inc.     
                                                            PC-09           6,449                  04/10/17   04/12/17    Mazone Plumbing and Heating, Inc.   
                                                            PC-09           6,449                  04/10/17     /  /      Mazone Plumbing and Heating, Inc.   
                                                            PC-10            -339                  05/22/17   06/26/17    Mazone Plumbing and Heating, Inc.   
 
14-0817   Reconstruction               0-017-014  04/14/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1866   Reconstruction               0-017-015  01/24/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01           1,832                  04/29/22   03/07/23    Technical Bldg Servs                
                                                            CC-01           1,832                  05/13/22   04/04/23    Technical Bldg Servs                
 
20-0487   Reconstruction               0-017-016  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1942FP Reconstruction               0-017-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0041SC Visual Structural Inspection 0-017-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Paige Elementary School:
92-1403   Reconstruction               0-018-005  07/26/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1599   Additions and Alterations    0-018-006  07/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0654   Reconstruction               0-018-007  02/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1288   Alterations                  0-018-008  12/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0461   Reconstruction               0-018-009  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0896   Reconstruction               0-018-010  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1709   Additions and Alterations    0-018-011  11/04/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10              7,246                  06/04/01   01/28/02    Brownell Elec.                      
                                                            15             -6,161                  05/15/01   05/23/02    Brownell Elec.                      
                                                            17             -7,019                  05/15/01   05/23/02    Bunkoff Gen. Contractors            
                                                            22               -556                  04/17/02   05/30/02    Bunkoff Gen. Contractors            
                                                            4              17,500                  01/18/01   01/28/02    Jupiter Environ.                    
                                                            4              -3,000                  05/15/01   05/23/02    J&B Roofing                         
                                                            5                -648                  05/15/01   05/23/02    Jupiter Environ.                    
                                                            5              -7,000                  05/15/01   05/23/02    Crisafulli Bros.                    
                                                            7              -7,000                  05/15/01   05/23/02    Crisafulli Bros.                    
 
05-0896   Reconstruction               0-018-012  10/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            1,890                  04/28/10   08/04/10    BUNKOFF GENERAL CONTRACTORS         
                                                            C2-2            9,451                  04/28/10   08/04/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-3              544                  04/28/10   08/04/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-4              544                  04/28/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C5-1            2,790                  04/28/10   08/06/10    RICHERS ELECTRIC INC                
 
07-0397   Additions and Alterations    0-018-013  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            1,862                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-10           8,840                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-11           1,500                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-2            3,680                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-3            1,553                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-4              971                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-5            6,943                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-6            7,169                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-7            2,731                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-8              768                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-9              603                  06/16/10   08/06/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C3-1              866                  06/16/10   08/06/10    MAZONE PLUMBING & HEATING INC       
                                                            C5-1            1,139                  06/16/10   08/06/10    BROWNELL ELECTRIC CORP              
                                                            C5-2            3,894                  06/16/10   08/06/10    BROWNELL ELECTRIC CORP              
                                                            C5-3            1,015                  06/16/10   08/06/10    BROWNELL ELECTRIC                   
                                                            C5-4            7,165                  06/16/10   08/06/10    BROWNELL ELECTRIC CORP              
 
14-0008   Reconstruction               0-018-014  11/07/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AIARC01        -5,809                  06/16/17   06/23/17    Mid-State Industries, Ltd.          
 
17-1573   Reconstruction               0-018-015  04/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0488   Reconstruction               0-018-016  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1941FP Reconstruction               0-018-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0040SC Visual Structural Inspection 0-018-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pleasant Valley School:
90-1432   Reconstruction               0-019-002  05/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0680   Reconstruction               0-019-003  03/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0430   Reconstruction               0-019-004  11/29/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1285   Alterations                  0-019-005  12/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0462   Reconstruction               0-019-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0998   Reconstruction               0-019-007  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1108   Additions and Alterations    0-019-008  07/25/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,850                  06/24/04   07/19/04    Clean Air Technology                
                                                            1              -3,234                  06/24/04   07/21/04    Weisburgh Mech.                     
                                                            1              17,710                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            1               4,888                  06/24/04   07/27/04    Brownell Elec.                      
                                                            10                649                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            12                953                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            13              3,609                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            2               5,000                  06/24/04   07/19/04    Clean Air Technology                
                                                            2                 586                  06/24/04     /  /      Weisburgh Mech.                     
                                                            2                -875                  06/24/04   07/21/04    Weisburgh Mech.                     
                                                            2-1           -35,309                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-10            8,701                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-11           21,266                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-12           21,786                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-13           17,383                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-14              839                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-15               76                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-16            1,682                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-17            9,205                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-18             -127                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-2            -1,430                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-4            -1,128                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-7            -1,337                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-8              -918                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            2-9            -1,995                  06/24/04   07/27/04    Bunkoff General Contractors         
                                                            3               1,000                  06/24/04   07/19/04    Clean Air Technology                
                                                            3               4,994                  06/24/04   07/21/04    Weisburgh Mech.                     
                                                            3-3                 0                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            4               7,488                  06/24/04   07/21/04    Weisburgh Mech.                     
                                                            5              -2,958                  06/24/04   07/21/04    Weisburgh Mech.                     
                                                            5-2            12,103                  07/20/04   07/27/04    Brownell Elec.                      
                                                            5-3             3,826                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-4             3,452                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-5              -226                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-6             6,221                  06/24/04   07/27/04    Brownell Elec.                      
                                                            5-7             5,479                  06/24/04   07/27/04    Brownell Elec.                      
                                                            6                -682                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            7               4,167                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            8                 546                  06/24/04   07/21/04    DiGesare Mech.                      
                                                            8               5,561                  06/24/04   07/27/04    Brownell Elec.                      
                                                            9               2,785                  06/24/04   07/21/04    DiGesare Mech.                      
 
04-1134   Reconstruction               0-019-009  07/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C3-1            8,195                  05/26/09   08/11/09    T. LEMME MECHANICAL INC             
                                                            C3-2            2,185                  05/26/09   08/11/09    T. LEMME MECHANICAL INC             
                                                            C5-1            1,606                  05/26/09   08/11/09    FARINA ELECTRIC INC                 
                                                            C5-2           -2,315                  05/26/09   08/11/09    FARINA ELECTRIC INC                 
                                                            C5-3            2,860                  05/26/09   08/11/09    FARINA ELECTRIC INC                 
 
09-1078   Reconstruction               0-019-010  10/07/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0818   Reconstruction               0-019-011  04/14/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01         -19,086                  05/22/17   06/26/17    Schnectady Hradware & Electric      
                                                            GC-01           6,757                  04/20/16   05/06/16    Hoosick Valley Contractors, Inc.    
                                                            GC-02           1,521                  04/20/16   05/06/16    Hoosick Valley Contractors, Inc.    
                                                            GC-03           9,173                  04/20/16   05/06/16    Hoosick Valley Contractors, Inc.    
                                                            GC-04               0                  04/20/16   05/06/16    Hoosivk Valley Contractors, Inc.    
                                                            GC-05          -1,500                  04/17/17   05/22/17    Hoosick Valley Contractors, Inc.    
                                                            HC-01           3,722                  04/20/16   05/06/16    T. Lemme Mechanical, Inc.           
                                                            PC-01         -17,500                  04/17/17   04/21/17    T. Lemme Mechanical, Inc.           
 
15-1499   Reconstruction               0-019-012  03/14/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0649   Additions and Alterations    0-019-013  04/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-02           8,111                  02/04/21   03/25/21    SULLIVAN CONTRACTING, INC.          
                                                            AC-09          18,404                  10/07/21   08/16/22    Sullivan Contracting Inc            
                                                            AC-09          18,405                  10/15/21   11/21/22    Sullivan Contracting Inc            
                                                            AC-09          18,404                  05/13/22     /  /      Sullivan Contrg Inc                 
                                                            AC-11           2,654                  10/07/21   11/22/22    Sullivan Contracting Inc            
                                                            AC-11           2,654                  10/15/21   08/16/22    Sullivan Contracting Inc            
                                                            EC-02          20,015                  11/26/21   12/15/22    Harold Clune Inc                    
                                                            EC-04          -1,573                  02/22/23   12/04/23    HAROLD R CLUNE INC                  
                                                            EC-04          -1,573                  12/28/22   12/14/23    Harold Clune Inc                    
                                                            GC-03         -11,255                  01/06/22   12/27/22    Murnane Bldg Contrs Inc             
                                                            GC-08          32,802                  03/10/22   02/23/23    Murnane Bldg Contrs Inc             
                                                            GC-09          12,038                  03/10/22   02/23/23    Murnane Bldg Contrs Inc             
                                                            GC-10           7,177                  03/10/22   02/23/23    Murnane Bldg Contrs Inc             
                                                            GC-11          31,925                  04/29/22     /  /      Murnane Bldg Contrs Inc             
                                                            GC-11          31,925                  05/13/22   04/20/23    Murnane Bldg Contrs Inc             
                                                            GC-13          28,275                  05/13/22     /  /      Murnane Bldg Contrs Inc             
                                                            GC-13          28,275                  05/18/22   04/03/23    Murnane Bldg Contrs Inc             
                                                            GC-15          29,265                  06/07/23   01/02/24    MURNANE BUILDING CONTRACTORS        
                                                            GC-19           6,259                  09/14/22   08/15/23    Murnane Bldg Contrs Inc             
                                                            GC-19           6,259                  06/07/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-21          20,709                  09/14/22   08/15/23    Murnane Bldg Contrs Inc             
                                                            GC-21          20,709                  06/07/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-22          -6,221                  12/28/22   12/12/23    Murnane Bldg Contrs Inc             
                                                            GC-22          -6,221                  06/07/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-23          19,116                  06/07/23   01/02/24    MURNANE BUILDING CONTRACTORS        
                                                            GC-25          10,693                  06/07/23   01/02/24    MURNANE BUILDING CONTRACTORS        
                                                            GC-28          -4,111                  06/07/23   01/02/24    MURNANE BUILDING CONTRACTORS        
                                                            GC-28          -4,111                  06/07/23     /  /      MURNANE BUILDIING CONTRACTORS       
                                                            GC-29          -2,094                  08/25/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            MC-01            -299                  05/03/22   02/28/23    RMB Mech Inc                        
                                                            MC-03           6,867                  09/23/22   10/31/23    RMB Mech Inc                        
                                                            MC-04         -10,297                  02/22/23   12/04/23    RMB MECH INC                        
                                                            MC-04         -10,297                  06/07/23   12/27/23    RMB MECHANICAL                      
                                                            MC-06           3,418                  06/07/23   12/27/23    RMB MECHANICAL                      
                                                            PC-01          -1,705                  11/02/21   12/09/22    DiGesare Mech, Inc                  
                                                            PC-01          -1,705                  02/22/23   12/04/23    DIGESARE MECH INC                   
                                                            PC-01          -1,705                  02/28/23   12/18/23    DIGESARE MECH INC                   
                                                            PC-03          -9,268                  04/05/23   12/21/23    DIGESARE MECHANICAL, INC            
                                                            PC-05          18,658                  04/05/23   12/21/23    DIGESARE MECHANICAL,INC             
 
19-0520   Reconstruction               0-019-014  10/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01           9,450                  06/12/20   07/20/20    United Safety                       
                                                            AA-01          -9,450                  10/07/21   11/21/22    United Safety LLC                   
                                                            AA-02          -5,000                  02/11/21   04/08/21    UNITED SAFETY, LLC                  
                                                            AC-02          -5,000                  10/07/21   11/22/22    United Safety LLC                   
                                                            MC-01          29,391                  06/12/20   07/20/20    Campito Plumbing  & Heating         
                                                            MC-01          29,391                  10/07/21   11/22/22    Campito Plumb&Heat, Inc             
 
20-0489   Reconstruction               0-019-015  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0039SC Visual Structural Inspection 0-019-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Van Corlaer Elementary School:
95-0681   Reconstruction               0-021-004  03/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0818   Reconstruction               0-021-005  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0900   Reconstruction               0-021-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1666   Reconstruction               0-021-007  02/04/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           5,950                  04/22/04   04/26/04    Bunkoff General Contractors         
                                                            00004           4,724                  04/22/04   04/26/04    Bunkoff General Contractors         
 
05-1045   Reconstruction               0-021-008  03/02/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            8,977                  05/19/10     /  /      MID STATE INDUSTRIES LTD            
                                                            C2-2            1,313                  05/19/10     /  /      MID STATE INDUSTRIES LTD            
                                                            C2-3           36,102                  05/19/10     /  /      MID STATE INDUSTRIES LTD            
                                                            C2-5            8,989                  07/21/10   01/11/11    MID STATE INDUSTRIES LTD            
                                                            C2-6            7,112                  05/19/10     /  /      MID STATE INDUSTRIES LTD            
                                                            C2-7            7,264                  05/19/10     /  /      MID STATE INDUSTRIES LTD            
 
08-1281   Reconstruction               0-021-009  05/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001             9,728                  06/30/11   07/27/11    MID-STATE INDUSTRIES LTD            
                                                            C2-03           6,651                  08/09/13   08/09/13    MID-STATE INDUSTRIES                
                                                            C2-2          -51,912                  06/30/11   07/27/11    MID-STATE INDUSTRIES LTD            
                                                            C3-1            1,329                  06/30/11   07/27/11    T. LEMME MECHANICAL INC             
                                                            C3-2            1,914                  06/30/11   07/27/11    T. LEMME MECHANICAL INC             
                                                            C3-3            6,843                  06/30/11   07/27/11    T. LEMME MECHANICAL                 
                                                            C4-1              831                  06/30/11   07/27/11    MAZONE PLUMBING & HEATING INC       
                                                            C4-2            1,910                  06/30/11   07/27/11    MAZONE PLUMBING                     
                                                            C5-1            2,950                  06/30/11   07/27/11    J. MCBAIN ELECTRIC                  
 
15-0484   Reconstruction               0-021-010  06/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01           7,378                  07/24/17   07/27/17    Sullivan Contracting Inc.           
                                                            AA-02           7,166                  01/22/18   02/02/18    Sullivan Contracting Inc.           
                                                            AA-03           3,189                  04/23/18   05/03/18    Sullivan Contracting Inc.           
                                                            EC-01           5,753                  02/05/18   03/08/18    Brownell Electric Corp.             
                                                            EC-02           4,996                  03/26/18   03/28/18    Brownell Electric Corp.             
                                                            EC-03           3,725                  03/26/18   03/28/18    Brownell Electric Corp.             
                                                            GC-01          23,039                  09/18/17   10/17/17    Bast Hatfield Construction LLC      
                                                            GC-02          -1,396                  04/23/18   05/03/18    Bast Hatfield Construction LLC      
                                                            GC-03          12,896                  04/23/18   05/03/18    Bast Hatfield Construction LLC      
                                                            GC-04          11,533                  04/23/18   05/03/18    Bast Hatfield Construction LLC      
                                                            GC-05          10,709                  04/23/18   05/03/18    Bast Hatfield Construction LLC      
                                                            GC-06         -71,879                  04/23/18   05/03/18    Bast Hatfield Construction LLC      
                                                            HC-01          -5,887                  04/25/18   05/03/18    Collett Mechanical, Inc.            
                                                            PC-01           8,727                  01/22/18   03/08/18    Tri-Valley Plumbing & Heating, Inc. 
                                                            PC-02          -3,399                  06/01/18   06/29/18    TRI-VALLEY PLUMBING & HEATING       
 
17-1574   Reconstruction               0-021-011  04/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0490   Reconstruction               0-021-012  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0043SC Visual Structural Inspection 0-021-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Washington Irving S AdultEd-NoAidBld:
97-0255   Reconstruction               0-022-003  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1037   Reconstruction               0-022-004  06/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-3            -3,412                  05/30/08   08/05/08    Kasselmen Electric co. inc          
                                                            C2-1            5,000                  05/30/08   09/29/08    mid State industries                
                                                            C2-2           27,000                  05/30/08   09/29/08    mid State industries                
                                                            C2-8            1,415                  05/30/08   09/29/08    Mid State Industries                
                                                            C2-9           61,963                  05/30/08   09/29/08    Mid State Indstries                 
 
11-0248   Reconstruction               0-022-006  01/09/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          4,521                  05/24/13   07/19/13    S&L Roofing & Sheetmetal, Inc.      
                                                            GC-002              0                  05/24/13   07/19/13    S&L Roofing & Sheetmetal, Inc.      
                                                            GC-002          8,010                  05/24/13   07/19/13    S&L Roofing & Sheetmetal, Inc.      
                                                            GC-003              0                  05/24/13   07/19/13    S&L Roofing & Sheetmetal, Inc.      
                                                            eC-001          4,265                  05/24/13   07/19/13    S&L Roofing & Sheetmetal, Inc.      
 
20-0491   Reconstruction               0-022-007  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Yates School:
92-1593   Reconstruction               0-024-002  08/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0682   Reconstruction               0-024-003  03/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0817   Reconstruction               0-024-005  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0901   Reconstruction               0-024-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0193   Reconstruction               0-024-007  12/16/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            21             17,600                  04/17/02   05/10/02    Bunkoff General Contractors         
 
05-0791   Reconstruction               0-024-008  08/07/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            1,584                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C2-3            8,260                  04/28/09   07/16/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            C6-1            9,484                  04/28/09   07/16/09    MONAHAN & LOUGHLIN INC              
 
09-0597   Reconstruction               0-024-009  05/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C3-1            1,763                  06/29/12   01/25/13    Merit Plumbing and Heating          
                                                            C3-2            1,691                  06/27/12     /  /      Merit Plumbing & Heating            
                                                            C3-2            1,691                  06/29/12   11/20/12    Merit Plumbing & Heating            
                                                            C3-3            3,242                  06/27/12   01/25/13    Merit Plumbing And Heating LLC      
                                                            C3-3            3,242                  06/29/12     /  /      Merit Plumbing & Heating            
 
19-0648   Reconstruction               0-024-010  04/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01          18,628                  10/30/20   01/08/21    SULLIVAN CONTRACTING, INC.          
                                                            AC-03          12,286                  12/02/20   02/01/21    SULLIVAN CONTRACTING, INC.          
                                                            AC-04          27,171                  12/02/20   02/01/21    SULLIVAN CONTRACTING, INC.          
                                                            AC-05          34,840                  12/02/20   02/01/21    SULLIVAN CONTRACTING, INC.          
                                                            AC-05          34,090                  10/07/21   11/21/22    Sullivan Contracting Inc            
                                                            AC-06           3,154                  10/07/21   08/16/22    Sullivan Contracting Inc            
                                                            AC-06           3,154                  10/15/21   11/21/22    Sullivan Contracting Inc            
                                                            AC-06           3,153                  05/13/22     /  /      Sullivan Contrg Inc                 
                                                            AC-07           5,574                  10/07/21   08/16/22    Sullivan Contracting Inc            
                                                            AC-07           5,574                  10/15/21   11/17/22    Sullivan Contracting Inc            
                                                            AC-07           5,574                  05/13/22   04/20/23    Sullivan Contrg Inc                 
                                                            AC-08          14,109                  10/07/21   08/16/22    Sullivan Contracting Inc            
                                                            AC-08          14,110                  10/15/21   11/16/22    Sullivan Contracting Inc            
                                                            AC-08          14,109                  05/13/22   04/20/23    Sullivan Contrg Inc                 
                                                            AC-10           3,059                  10/07/21   08/16/22    Sullivan Contrating Inc             
                                                            AC-10           3,059                  10/15/21   11/16/22    Sullivan Contracting Inc            
                                                            AC-10           3,059                  05/13/22   04/20/23    Sullivan Contrg Inc                 
                                                            AC-11           2,654                  05/13/22   04/20/23    Sullivan Contrg Inc                 
                                                            AC-12          27,281                  10/07/21   11/21/22    Sullivan Contracting Inc            
                                                            AC-12          27,281                  10/15/21   12/06/22    Sullivan Contracting Inc            
                                                            AC-12          27,281                  05/13/22   04/20/23    Sullivan Contrg Inc                 
                                                            AC-13          14,400                  04/29/22   05/22/23    Sullivan Contr Inc                  
                                                            AC-13          14,400                  05/13/22   04/20/23    Sullivan Contrg Inc                 
                                                            EC-01           4,863                  11/26/21   12/20/22    Harold Clune Inc                    
                                                            EC-03           9,018                  04/29/22   03/07/23    Harold Clune Inc                    
                                                            EC-03           9,018                  05/13/22     /  /      Harold Clune Inc                    
                                                            EC-05          -4,476                  02/22/23   12/04/23    HAROLD R CLUNE INC                  
                                                            EC-05          -4,476                  12/28/22   12/14/23    Harold Clune Inc                    
                                                            GC-01           1,495                  10/15/21   08/16/22    Murnane Bldg Contractors Inc        
                                                            GC-018         24,668                  06/07/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-02           2,438                  10/15/21   08/16/22    Murnane Bldg Contractors Inc        
                                                            GC-04           8,224                  01/06/22   12/27/22    Murnane Building Contrs Inc         
                                                            GC-05          26,968                  03/10/22   02/23/23    Murnane Bldg Contractors Inc        
                                                            GC-06           8,736                  03/10/22   02/23/23    Murnane Bldg Contractors Inc        
                                                            GC-07          13,003                  03/10/22   02/23/23    Murnane Bldg Contractors            
                                                            GC-12          10,631                  05/13/22   04/20/23    Murnane Bldg Contrs Inc             
                                                            GC-14           2,948                  05/18/22   04/03/23    Murnane Bldg Contrs Inc             
                                                            GC-14           2,948                  06/07/23     /  /      MURNANE BUILIND CONTRACTORS         
                                                            GC-16           9,864                  06/07/23   01/02/24    MURNANE BUILDING CONTRACTORS        
                                                            GC-17         375,764                  06/07/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-18          24,668                  08/05/22   12/22/23    Murnane Bldg Contrs Inc             
                                                            GC-20           2,608                  09/14/22   08/15/23    Murnane Bldg Contrs Inc             
                                                            GC-20           2,608                  06/07/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-24          10,003                  06/07/23   01/02/24    MURNANE BUILDING CONTRACTORS        
                                                            GC-26          10,840                  06/07/23   01/02/24    Turner Construction Co              
                                                            GC-27           4,724                  06/07/23   01/02/24    MURNANE BUILDING CONTRACTORS        
                                                            MC-02           2,089                  05/03/22   02/28/23    RMB Mech Inc                        
                                                            MC-02           2,089                  05/13/22   04/04/23    RMB Mech Inc                        
                                                            MC-05         -40,795                  02/22/23   12/27/23    EMB MECH INC                        
                                                            MC-05         -40,795                  06/07/23   12/04/23    RMB MECHANICAL                      
                                                            PC-02          -3,061                  04/05/23   12/21/23    DIGESARE MECHANICAL, INC            
                                                            PC-04          15,960                  03/10/23   12/13/23    DIGESARE MECHANICAL INC             
                                                            PC-04          15,960                  04/05/23     /  /      DIGESARE MECHANICAL, INC            
                                                            TC-01           1,497                  06/07/23   12/27/23    TECHANICAL BUILDING SERVICES        
 
20-0492   Reconstruction               0-024-011  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1939FP Reconstruction               0-024-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0036SC Visual Structural Inspection 0-024-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Zoller School:
92-1594   Reconstruction               0-025-002  08/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0463   Reconstruction               0-025-003  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0902   Reconstruction               0-025-004  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0989   Reconstruction               0-025-005  06/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1           10,476                  05/30/08   08/18/08    bette & cring                       
                                                            C2-10             811                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-11          14,649                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-12           4,076                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-13           2,110                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-14           9,500                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-2            4,949                  05/30/08   08/07/08    bette & cring                       
                                                            C2-3              756                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-4            6,887                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-5            3,850                  05/30/08   08/08/08    Bette & cring                       
                                                            C2-6           19,625                  05/30/08   08/07/08    Bette & cring                       
                                                            C2-7            7,835                  05/30/08   08/08/08    Bette & cring                       
                                                            C2-8            4,283                  05/30/08   08/07/08    Bette & Cring                       
                                                            C2-9            2,789                  05/30/08   08/08/08    Bette & cring                       
                                                            C3-1            1,560                  05/30/08   02/20/09    family danz heating and air         
                                                            C3-2            1,791                  05/30/08   02/20/09    family danz heating and air         
                                                            C4-1            3,052                  05/30/08   02/20/09    Family Danz Heating and Air Cond.   
                                                            C4-2            1,422                  05/30/08   02/20/09    family danz heating and air         
                                                            C4-3            1,879                  05/30/08   02/20/09    family danz heating and air         
                                                            C5-1            3,741                  05/30/08   02/20/09    Phoenix Electric Co.                
                                                            C5-2            1,360                  05/30/08   02/20/09    Phoenix Electric Co.                
                                                            C5-3            2,450                  05/30/08   02/20/09    Phoenix Electric Co.                
 
09-0682   Reconstruction               0-025-006  06/03/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            6,621                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-10           2,000                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-11            -750                  06/27/12   07/10/12    Bunkof General Contractors          
                                                            C2-12          -4,730                  06/27/12   07/10/12    Bunkoff General Contractor          
                                                            C2-13          -5,000                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-2            2,014                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-3           24,876                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-4            1,700                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-5            1,663                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-6            2,937                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-7            4,417                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-8            2,895                  06/27/12   07/10/12    Bunkoff General Contractors         
                                                            C2-9           -1,652                  06/27/12   07/10/12    Bunkoff General Contraltor          
                                                            C4-1            4,074                  06/29/12   12/12/12    Crisafulli Bros.                    
                                                            C5-1            9,498                  06/29/12   12/12/12    Kasselman Electric Co., Inc.        
                                                            C5-2            1,928                  06/29/12   12/12/12    Kasselman Electric Co., Inc.        
                                                            C5-3            1,256                  06/29/12   12/11/12    Kasselman Electric Co., Inc.        
                                                            C5-3            1,256                  06/29/12     /  /      Kesselmen Electric Co., Inc.        
 
17-1575   Reconstruction               0-025-007  04/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-001         80,233                  11/02/20     /  /      NEOPLANTA RESTORATION, INC.         
                                                            AC-002         -8,793                  11/02/20     /  /      NEOPLANTA RESTORATION, INC.         
                                                            AC-003          1,786                  11/02/20   01/22/21    NEOPLANTA RESTORATION, INC.         
                                                            EC-001         -2,029                  02/22/21   04/02/21    STILSING ELECTRIC, INC.             
                                                            EC-002            -91                  11/02/20   01/22/21    STILSING ELECTRIC, INC.             
                                                            EC-003        -29,568                  02/22/21   04/02/21    STILSING ELECTRIC, INC.             
                                                            EC-004            998                  02/22/21   04/02/21    STILSING ELECTRIC, INC.             
                                                            GC-004          1,208                  11/02/20   11/19/20    MID-STATE INDUSTRIES, LTD           
                                                            PC-001          2,479                  02/22/21   04/02/21    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-002          1,494                  02/22/21   04/02/21    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-003         -1,172                  11/02/20   01/22/21    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PCO-021        15,077                  10/22/21   12/06/22    Mid-State Industries Ltd            
                                                            PCO-023         2,585                  10/22/21   12/06/22    Mid-State Industries Ltd            
 
20-0493   Reconstruction               0-025-008  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1938FP Reconstruction               0-025-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0038SC Visual Structural Inspection 0-025-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dr. Martin L. King School:
90-1433   Reconstruction               0-027-001  05/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0683   Reconstruction               0-027-004  03/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1152   Alterations                  0-027-005  04/18/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0449   Reconstruction               0-027-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1036   Reconstruction               0-027-007  06/30/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-4             1,284                  05/30/08   08/08/08    KASSELMAN ELECTRIC CO.              
                                                            C2-1          -27,500                  05/30/08   08/08/08    MID STATE INDUSTRIES                
                                                            C2-10           4,730                  05/30/08   08/08/08    MID STATE INDUSTRIES                
                                                            C2-4           -6,666                  05/30/08   08/08/08    MID STATE INDUSTRIES                
                                                            C2-5            7,198                  05/30/08   08/27/08    MID STATE INDUSTRIES                
                                                            C2-6            2,116                  05/30/08   08/27/08    MID STATE INDUSTRIES                
                                                            C2-7            6,523                  05/30/08   08/08/08    MID STATE INDUSTRIES                
                                                            C3-1              439                  05/30/08   08/08/08    FAMILY DANZ HEATING AND AIR COND.   
                                                            C5-1            1,423                  05/30/08   08/27/08    KASSELMAN ELECTRIC CO,              
                                                            C5-2              699                  05/30/08   02/12/09    Kasselman Electric Co., Inc.        
                                                            C5-3            4,708                  05/30/08   02/12/09    Kasselman Electric Co., Inc.        
                                                            C5-5           -1,060                  05/30/08   08/08/08    KASSELMAN ELECTRIC CO.              
                                                            C6-1           12,000                  05/30/08   08/08/08    TITAN ROOFING,INC                   
 
07-2117   Reconstruction               0-027-008  11/24/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            4,453                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION          
                                                            C2-10          25,864                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C2-11           5,967                  06/30/11   07/27/11    BETTE & CRING                       
                                                            C2-12          16,276                  06/30/11   07/27/11    BETTE & CRING                       
                                                            C2-13           5,640                  06/30/11   07/27/11    BETTE & CRING                       
                                                            C2-14           8,820                  06/30/11   07/27/11    BETTE & CRING                       
                                                            C2-15          10,397                  06/30/11   07/27/11    BETTE & CRING                       
                                                            C2-16           5,096                  06/30/11   07/27/11    BETTE & CRING                       
                                                            C2-17          10,000                  06/30/11   07/27/11    BETTE & CRING                       
                                                            C2-2            4,707                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION          
                                                            C2-3           10,637                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C2-4              850                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C2-5           43,248                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C2-6            5,069                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C2-7            1,348                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C2-8            7,628                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C2-9            4,465                  06/30/11   07/27/11    BETTE & CRING CONSTRUCTION GROUP    
                                                            C3-1              953                  06/30/11   07/27/11    FAMILY DANZ HEATING & A/C           
                                                            C3-2            4,486                  06/30/11   07/27/11    FAMILY DANZ HEATING                 
                                                            C3-3            4,605                  06/30/11   07/27/11    FAMILY DANZ HEATING & A/C           
                                                            C3-4            9,146                  06/30/11   07/27/11    FAMILY DANZ HEATING                 
                                                            C3-5            5,000                  06/30/11   07/27/11    FAMILY DANZ HEATING                 
                                                            C4-1            2,810                  06/30/11   07/27/11    WJV MECHANICAL INC                  
                                                            C4-2            7,055                  06/30/11   07/27/11    WJV MECHANICAL INC                  
                                                            C4-3            4,406                  06/30/11   07/27/11    WJV MECHANICAL INC                  
                                                            C4-4            6,910                  06/30/11   07/27/11    WJV MECHANICAL INC                  
                                                            C4-5            7,945                  06/30/11   08/16/11    WJV MECHANICAL INC                  
                                                            C4-6            5,000                  06/30/11   07/27/11    WJV MECHANICAL INC                  
                                                            C5-1           15,451                  06/30/11   07/27/11    HAROLD R CLUNE INC                  
                                                            C5-10           5,000                  06/30/11   07/27/11    HAROLD R CLUNE INC                  
                                                            C5-11           4,711                  06/30/11   07/27/11    HAROLD R CLUNE INC                  
                                                            C5-2            9,975                  06/30/11   07/27/11    HAROLD R CLUNE INC                  
                                                            C5-3                0                  06/30/11   07/27/11    HAROLD R CLUNE INC                  
                                                            C5-4            6,029                  06/30/11   07/27/11    HAROLD CLUNE INC                    
                                                            C5-5           15,536                  06/30/11   07/27/11    H.R. CLUNE INC                      
                                                            C5-6            6,354                  06/30/11   07/27/11    H.R. CLUNE INC                      
                                                            C5-7            6,256                  06/30/11   07/27/11    H.R. CLUNE INC                      
                                                            C5-8            6,894                  06/30/11   07/27/11    H.R. CLUNE INC                      
                                                            C5-9            8,093                  06/30/11   07/27/11    H.R. CLUNE INC                      
 
18-1050   Additions and Alterations    0-027-009  06/10/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01           7,847                  01/16/20   12/12/23    UNITED SAFETY LLC                   
                                                            AA-01           7,847                  12/28/22     /  /      United Safety LLC                   
                                                            AA-02          65,383                  03/09/20   07/02/20    UNITED SAFETY, LLC                  
                                                            AA-03          23,600                  09/25/20   11/10/20    UNITED SAFETY, LLC                  
                                                            AA-04          26,463                  12/28/20   03/02/21    UNITED SAFETY, LLC                  
                                                            AA-04          26,463                  10/08/21   07/12/22    United Safety LLC                   
                                                            AA-05          26,491                  10/08/21   07/12/22    United Safety LLC                   
                                                            AA-06          26,491                  10/08/21   07/12/22    United Safety LLC                   
                                                            AA-07           7,015                  10/08/21   07/12/22    United Safety LLC                   
                                                            AA-08           4,583                  01/19/22   11/01/22    United Safety LLC                   
                                                            AC-02          65,383                  10/08/21   11/18/22    United Safety LLC                   
                                                            AC-03          23,600                  10/08/21   11/18/22    United Safety LLC                   
                                                            CC-01           5,195                  02/04/20   03/03/20    TECHNICAL BUILDING SERVICES         
                                                            CC-01           5,195                  10/08/21   07/12/22    Tech Bldg Services                  
                                                            CC-02           2,973                  07/24/20   10/26/20    TECHNICAL BUILDING SERVICES         
                                                            CC-02           2,973                  10/08/21   07/19/22    Tech Bldg Services                  
                                                            CC-03          13,803                  01/08/21   03/10/21    TECHNICAL BUILDING SERVICES         
                                                            CC-03          13,803                  10/08/21   07/19/22    Tech Bldg Serivices                 
                                                            CC-04           7,046                  10/08/21   07/19/22    Tech Bldg Services                  
                                                            CC-05          14,363                  10/08/21   07/12/22    Tech Bldg Services                  
                                                            CC-06         -10,231                  10/08/21   07/12/22    Tech Bldg Services                  
                                                            CC-07           8,082                  02/09/22   11/30/22    Tech Bldg Servs                     
                                                            CC-08           5,900                  07/26/22   05/09/23    Technical Building Services         
                                                            EC-01          46,148                  07/24/20   10/26/20    GROSS ELECTRIC, INC.                
                                                            EC-01          46,148                  10/08/21   07/12/22    Gross Electric Inc                  
                                                            EC-02           4,182                  10/08/21   07/12/22    Gross Electric Inc                  
                                                            EC-03           6,671                  10/08/21   07/12/22    Gross Electric Inc                  
                                                            EC-04           1,490                  10/08/21   07/12/22    Gross Electric Inc                  
                                                            EC-05           1,176                  10/08/21   07/12/22    Gross Electric Inc                  
                                                            EC-06          44,830                  10/08/21   07/12/22    Gross Electric Inc                  
                                                            EC-07          11,448                  10/08/21   07/12/22    Gross Electric Inc                  
                                                            EC-08         -14,383                  01/19/22   11/08/22    Gross Elec Inc                      
                                                            GC-01         110,165                  11/01/19   11/14/19    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-02          19,531                  07/03/20   08/12/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-03          37,415                  12/28/20   04/02/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-04          22,397                  12/02/20   02/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-05         -17,965                  12/02/20   02/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-06          31,529                  12/28/20   04/02/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-07          11,146                  12/28/20   04/02/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-08          24,388                  10/08/21   07/28/22    Bast Hatfield Construction LLC      
                                                            GC-09          10,851                  01/26/21   04/05/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-10          23,918                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-11           2,323                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-12          21,026                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-13           3,602                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-14          31,071                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-15           5,702                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-16          10,896                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-17          28,093                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-18          11,402                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-19          33,795                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-20           4,148                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-21          17,424                  10/08/21   07/28/22    Bast Hatfield Const LLC             
                                                            GC-22           1,153                  11/02/21   12/07/22    Bast Hatfield Const LLC             
                                                            GC-23         -13,146                  12/06/21   12/21/22    Bast Hatfield Const LLC             
                                                            GC-24           8,704                  01/19/22   11/01/22    Bast Hatfield Const LLC             
                                                            GC-25           5,893                  01/19/22   11/01/22    Bast Hatfield Const LLC             
                                                            GC-26          12,420                  02/09/22   02/13/23    Bast Hartfield Const LLC            
                                                            GC-26          12,420                  04/29/22   05/09/23    Bast Hatfield Const LLC             
                                                            GC-27           1,450                  04/29/22   02/22/23    Bast Hatfield Const LLC             
                                                            GC-28          20,039                  04/29/22   05/09/23    Bast Hatfield Const LLC             
                                                            GC-29           2,100                  04/29/22   05/09/23    Bast Hatfield Const LLC             
                                                            GC-30           5,801                  05/13/22   04/20/23    Bast Hatfield Const LLC             
                                                            GC-31          28,853                  07/26/22   05/22/23    Bast Hatfield Const LLC             
                                                            GC-32          25,149                  07/26/22   05/22/23    Bast Hatfield Const LLC             
                                                            GC-33           6,730                  07/26/22   05/22/23    Bast Hatfield Const LLC             
                                                            MC-01           5,261                  10/07/21   11/17/22    DiGesare Mech, Inc                  
                                                            MC-02           3,886                  03/10/22   02/22/23    DiGesare Mech Inc                   
                                                            MC-03          -1,450                  03/10/22     /  /      DiGesare Mech Inc                   
                                                            MC-04            -750                  02/26/22   05/09/23    DiGesare Mech Inc                   
                                                            PC-01           5,301                  12/28/20   03/02/21    E.W. THOMPKINS CO.,INC.             
                                                            PC-01           5,301                  10/07/21   11/17/22    E.W. Tompkins Company, Inc          
                                                            PC-02          -2,218                  09/04/20   11/05/20    E.W. TOMPKINS CO.,INC.              
                                                            PC-03            -490                  12/28/20   03/02/21    E.W. THOMPKINS CO.,INC.             
                                                            PC-04           1,408                  11/26/21   12/20/22    EW Tompkins Comp Inc                
                                                            PC-05           3,391                  11/02/21   12/09/22    E W Tompkins Company, Inc           
                                                            PC-06          11,241                  02/09/22   11/30/22    EW Tompkins Compy Inc               
                                                            PC-07           2,979                  05/03/22   02/28/23    EW Tompkins Comp Inc                
                                                            PC-08           1,323                  05/18/22   04/04/23    EW Tompkins Comp Inc                
 
20-0494   Reconstruction               0-027-010  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1943FP Reconstruction               0-027-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0044SC Visual Structural Inspection 0-027-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Woodlawn E.S (fmly M.S.):
91-1017   Reconstruction               0-032-004  04/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1596   Reconstruction               0-032-005  08/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0450   Reconstruction               0-032-006  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0712   Reconstruction               0-032-007  02/22/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C2-1            4,500                  05/30/08   08/18/08    Mid State industries                
                                                            C2-2             -900                  05/30/08   08/18/08    Mid State Industries, LTD           
                                                            C7A-1          22,116                  05/30/08   08/18/08    Architectural Glass                 
                                                            C7A-2           3,357                  05/30/08   08/18/08    Architectural Glass                 
                                                            C7A-3           3,136                  05/30/08   08/18/08    Architectural Glass                 
 
07-2006   Reconstruction               0-032-008  05/22/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1401   Reconstruction               0-032-009  05/29/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            16,915                  06/30/11   05/10/12    MID-STATE INDUSTRIES LTD            
                                                            005             8,047                  06/30/11   07/27/11    MID-STATE INDUSTRIES LTD            
                                                            006            -2,600                  06/30/11   07/27/11    MID-STATE INDUSTRIES LTD            
                                                            C2-1           91,961                  06/30/11   05/11/12    MID STATE INDUSTRIES LTD            
                                                            C2-2           10,213                  06/30/11   07/27/11    MID STATE INDUSTRIES LTD            
                                                            C2-4           10,369                  06/30/11   07/27/11    MID STATE INDUSTRIES LTD            
                                                            C2-7           19,994                  06/30/11   05/10/12    MID-STATE INDUSTRIES LTD            
                                                            C2-8            7,200                  06/30/11   07/27/11    MID-STATE INDUSTRIES LTD            
                                                            C5-1            6,708                  06/30/11   07/27/11    MARTIN ELECTRIC                     
                                                            C5-2              800                  06/30/11   07/27/11    MARTIN ELECTRIC                     
                                                            C5-3            2,164                  06/30/11   07/27/11    MARTIN ELECTRIC                     
 
18-1051   Additions and Alterations    0-032-010  04/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          -3,607                  11/02/21   12/07/22    United Safety LLC                   
                                                            CC-01           4,689                  08/24/20   10/29/20    TECHNICAL BUILDING SERVICES         
                                                            CC-01           4,689                  10/07/21   11/22/22    Technical Bldg Services             
                                                            EC-01         -20,812                  04/29/22   03/07/23    Gross Elec Inc                      
                                                            GC-01          97,000                  10/29/19   11/01/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-02          -1,498                  01/16/20   02/14/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-03         -22,892                  07/24/20   10/28/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-04          13,527                  08/03/20   10/02/20    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-05         -15,311                  10/13/20   12/30/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-06          26,560                  10/13/20   12/30/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-07          15,103                  10/13/20   12/30/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-08          32,815                  12/02/20   02/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-09          26,223                  12/02/20   02/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-10          21,394                  12/02/20   05/07/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-11          26,405                  12/02/20   05/07/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-12          19,835                  12/02/20   05/07/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-13          18,014                  12/02/20   05/07/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-14          27,341                  12/28/20   03/16/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-15          18,960                  12/28/20   04/02/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-16           6,874                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-16           6,874                  10/15/21     /  /      Bast Hatfield Const LLC             
                                                            GC-17          22,623                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-17          22,623                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-18          15,178                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-18          15,178                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-19           6,491                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-19           6,491                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-20           4,821                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-20           4,821                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-21          13,415                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-21          13,415                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-22           1,469                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-22           1,469                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-23          15,592                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-23          15,592                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-24           9,594                  10/07/21   08/16/22    Bast Hatfield Const LLC             
                                                            GC-24           9,594                  10/15/21   12/02/22    Bast Hatfield Const LLC             
                                                            GC-25           8,585                  11/02/21   12/07/22    Bast Hatfield Const LLC             
                                                            GC-26          -5,219                  01/06/22   12/27/22    Bast Hatfield Const LLC             
                                                            GC-27           4,687                  01/06/22   12/27/22    Bast Hatfield Const LLC             
                                                            MC-01          -1,858                  12/28/20   03/02/21    COLLETT MECHANICAL, INC.            
                                                            MC-02           1,674                  10/07/21   11/17/22    Collett Mech Inc                    
                                                            MC-03         -29,080                  02/09/22   11/30/22    Collett Mech Inc                    
                                                            PC-01           3,751                  10/07/21   11/17/22    Crisafulli Brothers Plub&Heat Contr 
                                                            PC-02          13,407                  12/02/20   02/01/21    CRISAFULLI BROTHERS PLUMBING & HEAT 
                                                            PC-02          13,408                  10/07/21   11/17/22    Crisafulli Bros Plumb&Heat Contrator
                                                            PC-03           5,057                  10/07/21   11/17/22    Crisafulli Bro Plumb&Heat Contractor
                                                            PC-04             398                  10/07/21   11/17/22    Crisafulli Bros plumb&Heat Contracto
                                                            PC-05             800                  10/07/21   11/17/22    Crisafulli Bros Plumb&Heat Contracto
                                                            PC-06          -1,640                  11/02/21   12/09/22    Crisafulli Bros Plum & Heating      
 
20-0495   Reconstruction               0-032-011  12/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1940FP Reconstruction               0-032-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0037SC Visual Structural Inspection 0-032-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXSABIS ChrtrSchModular-NoLongerUsed:
02-2404   New Construction             0-034-001  07/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXWilliam Keene ES See 8-036:
07-1031   Reconstruction               0-036-001  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1-1            3,200                  06/30/10   12/17/10    ERSI                                
                                                            C2-1            3,050                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-10           1,347                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-11             520                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-2              839                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-3            3,520                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-4            1,127                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-5           62,063                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-6           -3,201                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-7           13,721                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-8           18,436                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C2-9           13,901                  06/30/10   12/17/10    BAST HATFIELD                       
                                                            C3-1            4,903                  06/30/10   12/17/10    VBI INC                             
                                                            C3-2            2,257                  06/30/10   12/17/10    VBI LLC                             
                                                            C4-1            2,559                  06/30/10   12/17/10    JOHN V WARREN INC                   
                                                            C4-2            1,452                  06/30/10   12/17/10    JOHN V WARREN INC                   
                                                            C4-3            8,951                  06/30/10   12/17/10    JOHN V WARREN INC                   
                                                            C4-4              448                  06/30/10   12/17/10    JOHN V WARREN INC                   
                                                            C5-1           17,228                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-10           9,167                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-11             370                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-2           16,862                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-3            6,874                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-4            2,188                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-5            1,448                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-6           15,352                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-7            8,801                  06/30/10   12/17/10    KASSELMAN ELECTRIC                  
                                                            C5-8            2,658                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
                                                            C5-9           10,739                  06/30/10   12/17/10    KASSELMAN ELECTRIC CO INC           
 

          XXAdministration Bldg-NoLongerUsed:
92-0397   Additions and Alterations    1-001-001  11/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXStorage Building - No Longer Used:
90-1434   Reconstruction               2-023-001  05/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Shed @ Schenectady HS:
99-0440   New Construction             2-033-001  02/01/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
97-0822   Reconstruction               7-008-001  03/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mt Pleasant Athletics Complex:
22-2080   New Construction             7-045-001  08/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mt Pleasant Press Box:
22-2081   New Construction             7-046-001  08/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
96-1266   Reconstruction               7-999-001  05/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          William Keane ES (St Lukes) See0-036:
07-1030   New Construction             8-036-L01  01/24/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXKatharine Burr-Blodgett(Immaculate:
08-0246   Reconstruction               8-037-L01  09/03/08  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0452   Reconstruction               8-037-L02  11/14/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXFranklin D Roosevelt(St Adalberts):
08-0247   Reconstruction               8-038-L01  09/03/08  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0453   Reconstruction               8-038-L02  11/14/12  NO CHANGE ORDERS ON ELECTRONIC FILE