Change Order Status - Rockland


CLARKSTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-01-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Congers Elem - Community Learning:
91-0774   Reconstruction               0-001-002  02/26/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1196   Reconstruction               0-001-003  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0416   Reconstruction               0-001-006  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1214   Reconstruction               0-001-007  06/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            3              43,525                  01/16/07     /  /      Institutional Systems               
 
04-0386   Reconstruction               0-001-009  12/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0036   Additions and Alterations    0-001-010  02/04/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0627   Reconstruction               0-001-011  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-15               0                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-2            7,726                  10/30/09   12/29/09    AARK CONTRACTORS INC                
 
07-1363   Reconstruction               0-001-012  07/24/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0801   Reconstruction               0-001-014  10/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0120   Reconstruction               0-001-015  09/02/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -16,830                  01/15/16   01/28/16    Fanshawe, Inc.                      
                                                            GC-01          39,951                  09/29/15   10/07/15    Niram, Inc.                         
                                                            GC-01          39,951                  04/05/16   12/28/16    Niram, Inc.                         
                                                            GC-02           8,572                  09/29/15   10/07/15    Niram, Inc.                         
                                                            GC-02           8,572                  04/05/16   12/28/16    Niram, Inc.                         
                                                            GC-03          24,356                  09/29/15   10/07/15    Niram, Inc.                         
                                                            GC-03          24,356                  04/05/16   04/13/16    Niram, Inc.                         
                                                            GC-04          18,002                  09/29/15   10/07/15    Niram, Inc.                         
                                                            GC-04          18,002                  04/05/16   12/28/16    Niram, Inc.                         
                                                            GC-05          28,195                  09/29/15   10/07/15    Niram, Inc.                         
                                                            GC-05          28,195                  04/05/16   04/13/16    Niram, Inc.                         
                                                            GC-06           6,462                  02/08/16   04/12/16    Niram, Inc.                         
                                                            GC-07          12,165                  02/08/16   02/18/16    Niram, Inc.                         
                                                            GC-08          16,304                  02/08/16   02/18/16    Niram, Inc.                         
                                                            GC-09           3,080                  02/08/16   02/17/16    Niram, Inc.                         
                                                            MC-01         -14,219                  01/15/16   01/28/16    Joe Lomabardo Plumbing & Heating    
                                                            PC-01           7,207                  01/15/16   01/28/16    Bertussi's                          
                                                            PC-02           3,709                  01/15/16   01/28/16    Bertussi's                          
                                                            PC-03           5,105                  01/15/16   01/28/16    Bertussi's                          
 
19-0171   Reconstruction               0-001-016  12/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Birchwood School:
92-1227   Reconstruction               0-002-002  05/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0417   Reconstruction               0-002-007  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0469   Reconstruction               0-002-008  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0628   Reconstruction               0-002-009  04/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1074   Reconstruction               0-002-010  09/04/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1893   Reconstruction               0-002-011  11/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01B-002        -5,000                  10/12/17   11/10/17    Pearl River Plumbing Heating & Elect
                                                            BWES-001            0                  10/12/17   11/10/17    Fanshawe, Inc.                      
                                                            BWES-002            0                  10/12/17   11/10/17    Fanshawe, Inc.                      
                                                            BWES-02             0                  10/12/17   11/10/17    Pearl River Plumbing Heating & Elect
                                                            BWES-02         3,008                  10/12/17   11/10/17    Fanshawe Inc.                       
                                                            C-01B-02      -23,182                  10/12/17   11/10/17    Pearl River Plumbing Heating & Elect
                                                            EC01B001       14,653                  10/12/17   11/10/17    Fanshawe, Inc.                      
 
16-1220   Reconstruction               0-002-012  03/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1921   Reconstruction               0-002-013  10/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADGC0301            0                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            EC07-006       -1,500                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            GC03-003       -4,298                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            MC05-013       -1,500                  02/09/21   03/30/21    JOE LOMBARDO PLUMBING & COOLING OF R
 
19-0172   Reconstruction               0-002-014  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            05-003            287                  05/20/21   08/13/21    JOE LOMBARDO PLUMBING               
                                                            ADGC0301            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0302            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0303            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0304            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            EC06-005        1,819                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-006        1,059                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-009        1,390                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            GC03-003         -886                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            PC05017         1,514                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
 
20-1781   Reconstruction               0-002-015  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0047   Reconstruction               0-002-016  01/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          New City Elementary:
92-0768   Reconstruction               0-003-003  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0863   Reconstruction               0-003-005  11/27/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0418   Reconstruction               0-003-006  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0806   Reconstruction               0-003-007  06/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1215   Reconstruction               0-003-008  06/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              43,525                  01/16/07     /  /      Institutional Systems               
 
06-0625   Additions and Alterations    0-003-010  03/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            34,335                  05/21/15   06/10/15    Bertussi Plumbing Heating & Cooling 
                                                            007            40,788                  05/21/15   06/10/15    Eastland Construction Inc.          
                                                            1               7,015                  05/21/15   06/10/15    Eastland Construction Inc.          
                                                            4              16,722                  05/21/15   06/10/15    Eastland Construction Inc.          
                                                            EC-1            2,091                  05/21/15   06/10/15    Fanshawe Inc.                       
                                                            EC-2            2,000                  05/21/15   06/10/15    Fanshawe Inc.                       
                                                            EC-3              251                  05/21/15   06/10/15    Fanshawe Inc.                       
 
05-0678   Reconstruction               0-003-011  05/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             1,053                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            003             1,053                  05/21/15     /  /      Betrussi Plumbing Heating & Cooling 
                                                            004             2,812                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            005            -4,522                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            02              1,090                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            02              1,090                  05/21/15   05/29/15    Bertussi Plumbing Heating & Cooling 
                                                            1               9,165                  02/13/09   06/09/09    ALL BRIGHT ELECTRIC                 
                                                            1             123,878                  05/22/09   02/02/11    PEARL RIVER PLUMBING HEATING & ELEC 
 
07-0629   Reconstruction               0-003-012  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADT-3             731                  05/12/10   12/22/10    ADT SECURITY SERVICES               
                                                            GC-8            7,012                  10/30/09   12/29/09    AARK CONTRACTORS INC                
 
11-1041   Reconstruction               0-003-013  08/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0175   Reconstruction               0-003-014  11/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD02-003            0                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            AD02-004            0                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            AD04-002            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            AD04-004            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            AD05-003            0                  11/06/18   01/02/19    ROCKLAND ELECTRIC                   
                                                            EC05-008       -1,992                  07/23/19   07/24/19    FANSHAWE, INC.                      
                                                            GC02-001       -2,349                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            GC02-010      -13,000                  07/23/19   07/24/19    TITAN ROOFING, INC.                 
                                                            GC02-013      -14,766                  07/23/19   07/24/19    TITAN ROOFING, INC.                 
                                                            MC03-006       -4,500                  07/23/19   07/23/19    JOE LOMBARDO PLUMBING,HEAT & COOLING
                                                            PC04-007         -726                  07/23/19   07/23/19    JOSEPH LOMBARDO PLUMBING,HEAT & COOL
 
19-0173   Reconstruction               0-003-015  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC05011         1,488                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
 
20-1782   Reconstruction               0-003-016  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1213FP Reconstruction               0-003-FP1  09/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Little Tor Elementary School:
91-0106   Reconstruction               0-004-002  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1317   Reconstruction               0-004-004  06/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1630   Reconstruction               0-004-006  07/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0370   Reconstruction               0-004-007  10/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0419   Reconstruction               0-004-009  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1216   Reconstruction               0-004-010  06/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              43,525                  01/16/07     /  /      Institutional Systems               
 
05-0679   Reconstruction               0-004-011  05/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             1,090                  05/22/09   06/05/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            003             5,472                  05/22/09   06/05/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            1               1,551                  02/13/09   06/09/09    ALL BRIGHT ELECTRIC                 
                                                            1              81,432                  05/22/09   06/05/09    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            4              -4,522                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
 
07-0630   Reconstruction               0-004-013  04/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1042   Reconstruction               0-004-014  08/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0176   Reconstruction               0-004-015  11/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD01-001            0                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            AD03-002            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            AD06-003            0                  11/28/18   01/07/19    FANSHWE, INC.                       
                                                            EC05-003       -5,823                  11/06/18   01/02/19    ROCKLAND ELECTRIC                   
                                                            EC05-004       -9,963                  11/06/18   01/02/19    ROCKLAND ELECTRIC                   
                                                            EC05-006       -2,500                  07/23/19   07/24/19    FANSHAWE, INC.                      
                                                            EC06-001      -31,653                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            EC06-007       -3,748                  07/23/19   07/23/19    FANSHAWE, INC.                      
                                                            EC06-011       -2,500                  07/23/19   07/23/19    FANSHAWE, INC.                      
                                                            GC01-003       -2,032                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            GC01-006      -37,774                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            GC01-007      -14,000                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            GC01-009      -17,774                  07/23/19   07/24/19    GTS CONSTRUCTION CORP.              
                                                            GC01-011       -7,000                  07/23/19   07/24/19    GTS CONSTRUCTION CORP.              
                                                            MC03-004       -5,767                  07/23/19   07/23/19    JOE LOMBARDO PLUMBING,HEAT & COOLING
 
19-0174   Reconstruction               0-004-016  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            05-005            696                  05/20/21   08/13/21    JOE LOMBARDO PLUMBING               
                                                            PC05012         1,755                  05/20/21   08/13/21    Joe Lomardo Plumbing And Heating    
 
20-1783   Reconstruction               0-004-017  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Chestnut Grove(Data Center):
91-1073   Reconstruction               0-005-003  04/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1550   Reconstruction               0-005-004  07/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1561   Reconstruction               0-005-006  07/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0420   Reconstruction               0-005-009  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1043   Reconstruction               0-005-011  08/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1922   Reconstruction               0-005-012  10/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADGC0201            0                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            ADGC0202            0                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            ADMC0502            0                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            EC07-004       -2,500                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            GC02-003      -14,859                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            GC04-001       -5,000                  11/23/20   01/29/21    MACE CONTRACTING CORP.              
                                                            MC05-004        3,440                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            PC06-002       -2,500                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
 
19-0175   Reconstruction               0-005-013  12/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2340FP Reconstruction               0-005-FP1  08/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Nyack Elementary School:
92-0769   Reconstruction               0-006-003  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0864   Reconstruction               0-006-007  11/27/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0421   Reconstruction               0-006-008  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1217   Reconstruction               0-006-010  06/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              43,525                  01/16/07     /  /      Institional systems                 
 
02-0196   Reconstruction               0-006-012  03/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0680   Reconstruction               0-006-014  05/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             3,719                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            004            -4,522                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            005             3,205                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            006             3,745                  02/13/09   06/10/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            1              65,736                  02/13/09   06/10/09    PEARL RIVER PLUMBING HEATING & ELECT
                                                            1              15,116                  02/13/09   06/10/09    ALL BRIGHT ELECTRIC                 
                                                            2               4,448                  02/13/09   04/03/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            7              10,000                  02/13/09   06/10/09    BERTUSSI PLUMBING HEATING & COOLING 
 
07-0631   Reconstruction               0-006-015  04/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0802   Reconstruction               0-006-017  10/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0177   Reconstruction               0-006-018  11/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD02-002            0                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            AD02-005            0                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            ADEC0604            0                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            ADMC0304            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            EC05-010       -2,500                  07/23/19   07/24/19    FANSHAWE, INC.                      
                                                            EC06-002       -8,123                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            EC06-003          834                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            EC06-005      -10,000                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            EC06-013       -2,500                  07/23/19   07/23/19    FANSHAWE, INC.                      
                                                            EC06004        -8,026                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            GC02-002       -2,349                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            GC02-004       -1,639                  07/23/19   07/24/19    TITAN ROOFING, INC.                 
                                                            GC02-005       -4,350                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            GC02-011      -13,000                  07/23/19   07/24/19    TITAN ROOFING, INC.                 
                                                            GC02-014      -12,858                  07/23/19   07/24/19    TITAN ROOFING, INC.                 
                                                            MC03-007       -4,360                  07/23/19   07/23/19    JOE LOMBARDO PLUMB,HEAT & COOLING OF
                                                            PC04-008         -810                  07/23/19   07/23/19    LOE LOMBARO PLUMB,HEAT & COOLING,INC
 
19-0176   Reconstruction               0-006-019  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC05009         1,385                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
 
20-1784   Reconstruction               0-006-020  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bardonia Elementary School:
92-0284   Reconstruction               0-007-003  10/21/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0732   Reconstruction               0-007-005  01/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0422   Reconstruction               0-007-007  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1218   Reconstruction               0-007-008  06/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               2,959           2,959  01/16/07   12/28/07    Institutional Systems               
                                                            3              43,525                  01/16/07   12/28/07    Institional Systems                 
 
06-0564   Reconstruction               0-007-011  05/17/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0681   Reconstruction               0-007-012  05/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            10,131                  02/13/09   04/03/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            004            -4,522                  02/13/09   04/03/09    BETRUSSI PLUMBING HEATING & COOLING 
                                                            005             3,744                  02/13/09   04/03/09    BETUSSI PLUMBING HEATING & COOLING  
                                                            006             6,774                  02/13/09   04/03/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            1              75,771                  02/13/09   04/03/09    PEARL RIVER PLUMBING                
                                                            1               7,174                  02/13/09   06/09/09    ALL BRIGHT ELECTRIC                 
                                                            2               7,390                  02/13/09     /  /      BERTUSSI PLUMBING HEATING & COOLING 
 
07-0632   Reconstruction               0-007-014  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            1,558                  10/23/09   12/28/09    FANSHAWE INC d/b/a ROCKLAND ELECTRIC
 
07-1364   Reconstruction               0-007-015  07/24/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1044   Reconstruction               0-007-017  08/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1894   Reconstruction               0-007-018  11/07/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1221   Reconstruction               0-007-019  03/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            COEC-001       -5,000                  12/20/17   02/13/18    HVS, LLC                            
 
17-1923   Reconstruction               0-007-020  10/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADGC0203            0                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            EC07-001        2,348                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            GC02-001        6,858                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            GC02-002        3,190                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            GC02-004         -200                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            MC05-003       10,371                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
 
19-0177   Reconstruction               0-007-021  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            ADGC0301            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADSC7001            0                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
                                                            ADSC7002            0                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
                                                            EC06-014        5,899                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            GC03-001        1,883                  04/26/21   08/06/21    VINCO BUILDER, LLC                  
                                                            GC03-004         -284                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            PC05018         1,513                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
                                                            SC07-003       -1,731                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
 
20-1785   Reconstruction               0-007-022  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1212FP Reconstruction               0-007-FP1  09/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School North Annex:
00-1317   Reconstruction               0-009-003  05/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              3,542                  04/12/02   04/26/02    Pearl River PH&E                    
 
04-0158   Reconstruction               0-009-004  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School North:
91-1074   Reconstruction               0-010-002  04/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0775   Reconstruction               0-010-003  02/26/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0975   Reconstruction               0-010-005  05/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1255   Reconstruction               0-010-007  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1130   Reconstruction               0-010-011  04/29/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0756   Additions and Alterations    0-010-012  06/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001A         896,291                  10/24/05   04/03/07    darlind Construction                
                                                            003             5,132                  04/06/09     /  /      VARDON, INC.                        
                                                            003            11,672                  04/06/09     /  /      J.D. PARRELLA ELECTRIC, INC.        
                                                            005            13,355                  04/06/09     /  /      J.D. PARRELLA ELECTRIC, INC.        
                                                            006            65,000                  04/06/09     /  /      J.D. PARRELLA ELECTRIC, INC.        
                                                            1              52,000                  12/23/05   04/12/06    Vardon Inc                          
                                                            1              71,395                  12/23/05     /  /      thomas Kempton                      
                                                            1              15,041                  12/23/05   01/19/06    JD parrella electric                
                                                            2              20,995                  10/24/05   03/23/07    Darlind Construction                
                                                            2              36,421                  12/23/05     /  /      Vardon Inc                          
                                                            2A             46,776                  10/24/05   04/03/07    darlind Construction                
                                                            3              16,901                  10/24/05   04/03/07    darlind Construction                
                                                            4               2,216                  10/24/05   12/07/05    darlind Construction                
                                                            5              41,529                  12/23/05   06/26/06    Darlind Construction                
 
03-0423   Reconstruction               0-010-013  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1259   Reconstruction               0-010-014  12/11/12  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0626   Additions and Alterations    0-010-015  03/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-4            2,085                  05/21/15   06/10/15    Fanshawe Inc.                       
 
07-0633   Reconstruction               0-010-017  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-7            1,897                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            PC-2            8,050                  08/07/09   09/18/09    JAC MECHANICAL SERVICES INC         
 
07-0641   Reconstruction               0-010-018  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SGC-1         -22,327                  10/23/09   12/28/09    ETRE ASSOCIATES LTD                 
                                                            SGC-3           5,750                  10/23/09   12/28/09    ETRE ASSOCIATES LTD                 
 
12-0065   Additions and Alterations    0-010-019  03/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1895   Reconstruction               0-010-020  11/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01A-001         6,352                  10/12/17   11/10/17    Pearl River Plumbing Heating & Elect
                                                            01BNHS01        2,302                  10/12/17   11/10/17    Fanshawe Inc.                       
                                                            AD-MC-01            0                  10/12/17   11/10/17    Pearl River Plumbing Heating & Elect
                                                            C-01B-01            0                  10/12/17   11/10/17    Pearl River Plumbing Heating & Elect
                                                            EC01B001            0                  10/12/17   11/10/17    Fanshawe, Inc.                      
                                                            EC01B001            0                  10/12/17   11/10/17    Fanshawe, Inc.                      
                                                            NHS-003             0                  10/12/17   11/10/17    Fanshawe, Inc.                      
 
16-0519   Reconstruction               0-010-021  12/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-NHS        10,237                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            001-NHS             0                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            002-NHS        -2,405                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            002-NHS             0                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            003-NHS        -4,703                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            003-NHS             0                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            004-NHS       -23,142                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            005-NHS       -23,267                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            006-NHS        -8,000                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            EC01A001            0                  10/12/17   10/19/17    Fanshawe, Inc.                      
                                                            EC01A001          608                  10/12/17   10/19/17    Fanshawe, Inc.                      
                                                            EC01A002            0                  10/12/17   10/19/17    Fanshawe, Inc.                      
                                                            EC01A002        3,481                  10/12/17   10/19/17    Fanshawe, Inc.                      
                                                            NHS-001        10,355                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            NHS-002         1,946                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            NHS-003           630                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            NHS-004           778                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            NHS-005         1,714                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            NHS-006         1,397                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            NHS-007         6,071                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
 
16-0263   Reconstruction               0-010-022  09/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1222   Reconstruction               0-010-023  03/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0178   Reconstruction               0-010-024  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            05-007          1,996                  05/21/21   08/13/21    JOE LOMBARDO PLUMBING               
                                                            ADGC8001            0                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            ADGC8002            0                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            ADGC8003            0                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            ADSC01-3            0                  07/12/22   05/09/23    Landscape Unlimited Inc             
                                                            ADSC0101            0                  04/26/21   08/06/21    LANDSCAPE UNLIMITED, INC.           
                                                            GC08-001        3,444                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            GC08-002        2,306                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            GC08-003        2,355                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            GC08-004        1,200                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            GC08-005        3,313                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            GC08-006          498                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            GC08-007        3,640                  04/26/21   08/06/21    WALLKILL GROUP, INC.                
                                                            SC-01-04      -13,394                  12/20/22   12/06/23    Landscape Unlimited Inc             
                                                            SC-01-05      -43,326                  12/20/22   12/06/23    Landscape Unlimited Inc             
                                                            SC01-001       21,000                  04/26/21   08/06/21    LANDSCAPE UNLIMIED, INC.            
                                                            SC01-002          787                  04/26/21   08/06/21    LANDSCAPE UNLIMITED, INC.           
 
22-0698   Reconstruction               0-010-025  01/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1216FP Reconstruction               0-010-FP1  09/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Laurel Plains Elementary:
91-0107   Reconstruction               0-011-002  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1197   Reconstruction               0-011-003  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0896   Additions and Alterations    0-011-005  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0424   Reconstruction               0-011-006  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0682   Reconstruction               0-011-007  05/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004               667                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            005             9,159                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            1              91,703                  02/13/09   04/03/09    PEARL RIVER PLUMBING HEATING & ELEC 
                                                            1               8,460                  02/13/09   06/09/09    ALL BRIGHT ELECTRIC                 
                                                            2                 544                  02/13/09   04/03/09    BERTUSSI PLUMBING HEATING & COOLING 
                                                            3               4,522                  02/13/09   04/23/09    BERTUSSI PLUMBING HEATING & COOLING 
 
07-0634   Reconstruction               0-011-008  04/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0266   Reconstruction               0-011-010  09/27/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0803   Reconstruction               0-011-011  10/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1896   Reconstruction               0-011-012  11/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            LPES-001            0                  10/12/17   11/10/17    Fanshawe, Inc.                      
                                                            LPES-01         4,078                  10/12/17   11/10/17    Fanshawe Inc.                       
 
16-0520   Reconstruction               0-011-013  12/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-LPES          239                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            EC01A001        2,283                  10/12/17   10/19/17    Fanshawe, Inc.                      
                                                            EC01A001       -7,943                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            EC01A002        3,397                  10/12/17   10/19/17    Fanshawe, Inc.                      
                                                            EC01A002      -25,000                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            EC01A003       -8,000                  10/12/17   10/19/17    More Roofing, Inc.                  
                                                            LPES-001            0                  10/12/17   10/19/17    Joe Lombardo Plumbing & Heating of R
 
19-0179   Reconstruction               0-011-014  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-001              0                  05/20/21   06/30/21    ZN CONSTR                           
                                                            02-001         11,340                  05/20/21   06/30/21    ZN Construction                     
                                                            02-002              0                  05/20/21   06/30/21    ZN CONSTR                           
                                                            02-002           -943                  05/20/21   06/30/21    ZN CONSTR                           
                                                            02-003              0                  05/20/21   06/30/21    ZN CONSTR                           
                                                            02-004              0                  05/20/21   06/30/21    ZN CONSTR                           
                                                            02-005              0                  05/20/21   06/30/21    ZN CONSTR                           
                                                            02-006              0                  05/20/21   06/30/21    ZN CONSTR                           
                                                            02-007              0                  05/20/21   06/30/21    ZN CONSTR                           
                                                            ADEC0601            0                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-013       -3,153                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            PC05014         1,911                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
 
03-0934FP Reconstruction               0-011-FP1  02/02/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Felix Festa Junior High:
92-1228   Reconstruction               0-012-005  05/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1471   Reconstruction               0-012-006  06/21/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0211   Reconstruction               0-012-008  10/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0425   Reconstruction               0-012-014  10/08/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            002            59,016                  07/25/06   12/27/06    Joe Lombardo Plumbing               
                                                            005            65,000                  07/25/06     /  /      Joe Lombardo Plumbing               
                                                            007            69,429                  07/25/06     /  /      JD Parella Electric                 
                                                            12             45,890                  07/25/06   08/10/06    Morris Park Contracting             
                                                            4               8,048                  07/25/06   12/27/06    Joe Lombardo Plumging               
                                                            6              32,535                  07/25/06     /  /      JD Parella Electric                 
                                                            8              20,312                  07/25/06     /  /      Jd Parella Electric                 
 
03-1440   Reconstruction               0-012-016  04/13/05  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1045   Reconstruction               0-012-018  08/08/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,345                  12/03/15   12/30/15    FANSHAWE,INC.DBA ROCKLAND ELECTRIC  
 
05-0287   Reconstruction               0-012-019  12/28/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1419   Reconstruction               0-012-020  01/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0635   Reconstruction               0-012-021  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADT-1          18,833                  05/12/10   12/22/10    ADT SECURITY SERVICES               
                                                            EC-2           12,674                  10/23/09   12/28/09    FANSHAWE INC d/b/a ROCKLAND ELECTRIC
                                                            EC-3            1,823                  10/23/09   12/28/09    FANSHAWE INC d/b/a ROCKLAND ELECTRIC
                                                            EC-4            1,295                  10/23/09   12/28/09    FANSHAWE INC d/b/a ROCKLAND ELECTRIC
                                                            EC-6            5,170                  10/23/09   12/28/09    FANSHAWE INC d/b/a ROCKLAND ELECTRIC
                                                            EC-7           -8,500                  10/23/09   12/28/09    FANSHAWE INC d/b/a ROCKLAND ELECTRIC
                                                            GC-11           2,715                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-13           9,067                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-16             953                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-6            1,765                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            MC-1           15,000                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS INC          
                                                            MC-2           65,000                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS INC          
                                                            MC-3           14,000                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS INC          
                                                            MC-4           16,369                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS INC          
                                                            MC-5            8,864                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS INC          
                                                            MC-6            6,440                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS, INC         
                                                            MC-7           -5,000                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS INC          
                                                            PC-1           -2,272                  08/07/09   09/18/09    JAC MECHANICAL SERVICES INC         
                                                            PC-3            9,926                  08/07/09   09/18/09    JAC MECHANICAL SERVICES INC         
                                                            PC-4            3,951                  08/07/09   09/18/09    JAC MECHANICAL SERVICES INC         
 
07-0642   Reconstruction               0-012-022  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SGC-4           6,600                  10/23/09   12/28/09    ETRE ASSOCIATES LTD                 
                                                            SGC-5           1,975                  10/23/09   12/28/09    ETRE ASSOCIATES LTD                 
                                                            SGC-6           2,100                  10/23/09   12/28/09    ETRE ASSOCIATES LTD                 
 
10-0187   Reconstruction               0-012-024  09/03/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1464   Reconstruction               0-012-025  09/03/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0579   Reconstruction               0-012-027  02/17/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002              0                  06/23/16   10/05/16    Marfi Contracting Corp.             
                                                            GC-003        -12,000                  06/23/16   10/05/16    Marfi Contracting Corp.             
                                                            GC-01               0                  06/24/16   10/05/16    Marfi Contracting Corp.             
 
15-1897   Reconstruction               0-012-028  11/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            FFMS-001            0                  11/20/17   12/01/17    Fanshawe, Inc.                      
                                                            FFMS-01         4,261                  10/12/17   11/10/17    Fanshawe Inc.                       
                                                            FFMS-02        19,539                  10/12/17   11/10/17    Fanshawe Inc.                       
                                                            FFMS-03           752                  10/12/17   11/10/17    Fanshawe Inc.                       
                                                            FFMS-04        24,610                  10/12/17   11/10/17    Fanshawe Inc.                       
 
16-0521   Reconstruction               0-012-029  12/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001FFMS             0                  10/12/17   10/19/17    Milcon Construction Corporation     
                                                            002FFMS             0                  10/12/17   10/19/17    Milcon Construction Corporation     
                                                            003 FFMS        5,496                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
                                                            01A-001        -2,530                  10/12/17   10/19/17    Pearl River Plumbing Heating & Elect
                                                            01A-001           576                  10/12/17   10/19/17    Fanshawe, Inc.                      
                                                            01A-001          -978                  10/12/17   10/19/17    Milcon Construction Corporation     
                                                            01A-002       -37,201                  10/12/17   10/19/17    Milcon Construction Corporation     
                                                            01A-003       -22,000                  10/12/17   10/19/17    Milcon Construction Corporation     
                                                            01A-003             0                  10/12/17   10/19/17    Milcon Construction Corporation     
                                                            FFMS-001            0                  10/12/17   10/19/17    Joe Lombardo Plumbing & Heating of R
                                                            FFMS-001        1,029                  11/09/17   11/16/17    Joe Lombardo Plumbing and Heating of
                                                            FFMS-002        1,383                  11/09/17   11/16/17    Joe Lombardo Plumbing and Heating of
                                                            FFMS-004        5,312                  10/12/17   10/19/17    Joe Lombardo Plumbing and Heating of
 
16-1223   Reconstruction               0-012-031  03/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0928   Reconstruction               0-012-032  01/20/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-GC-01            0                  11/30/17   12/15/17    Pearl River P/H/E dba Bertussi's    
                                                            AD-GC-02            0                  11/30/17   12/15/17    Pearl River P/H/E dba Bertussi's    
                                                            AD-GC-03            0                  11/30/17   12/15/17    Pearl River P/H/E dba Bertussi's    
                                                            AD-GC-05            0                  11/30/17   12/15/17    Pearl River P/H/E dba Bertussi's    
 
19-0180   Reconstruction               0-012-033  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            05-001          1,089                  05/20/21   08/13/21    JOE LOMBARDO PLUMBING               
                                                            ADEC0601        3,703                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            ADGC0301            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0302            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0303            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0304            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0305            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADGC0306            0                  04/26/21   08/06/21    VINCO BUILDERS, LLC                 
                                                            ADMC0401            0                  04/26/21   07/02/21    S&L PLUMBING & HEATING              
                                                            ADMC0402            0                  04/26/21   07/02/21    S&L PLUMBING & HEATING              
                                                            ADSC7002            0                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
                                                            ADSC7003            0                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
                                                            ADTL9001            0                  04/26/21   07/02/21    MEHL ELECTRIC CO., INC.             
                                                            ADTL9002            0                  04/26/21   07/02/21    MEHL ELECTRIC CO., INC.             
                                                            ADTL9003            0                  04/26/21   07/02/21    MEHL ELECTRIC CO., INC.             
                                                            COSC7004       -3,490                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
                                                            EC06-001       12,075                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-002        3,703                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-003        2,169                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-004        3,639                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-007        2,023                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-008        3,319                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-010        2,269                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-011        2,291                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            EC06-012         -952                  04/26/21   07/02/21    FANSHAWE, INC.                      
                                                            GC03-002       -3,018                  04/26/21   08/06/21    Vinco Builders                      
                                                            MC04-001       25,114                  04/26/21   07/02/21    S&L PLUMBING & HEATING              
                                                            MC04-002      -11,419                  04/26/21   07/02/21    S&L PLUMBING & HEATING              
                                                            PC05016         4,939                  05/20/21   08/27/21    Joe Lomardo Plumbing and Heating    
                                                            SC07-001       60,595                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
                                                            SC07-002       13,218                  04/26/21   08/06/21    ENVIROMENTAL CONSTRUCTION, INC.     
                                                            TL09-001       -2,944                  04/26/21   07/02/21    MEHL ELECTRIC CO., INC.             
 
22-0699   Reconstruction               0-012-034  01/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1263FP Reconstruction               0-012-FP1  09/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dina Link Elementary:
92-1198   Reconstruction               0-013-002  05/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1205   Reconstruction               0-013-005  07/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,700                  06/30/04   06/30/04    Parker Elec.                        
                                                            1               2,428                  06/30/04   06/30/04    Pearl River Plumbing                
                                                            1              12,600                  06/30/04   06/30/04    Robert Runge Const.                 
                                                            2                 830                  06/30/04   06/30/04    Parker Elec.                        
                                                            2               5,083                  06/30/04   06/30/04    Pearl River Plumbing                
                                                            2             -18,268                  06/30/04   06/30/04    Robert Runge Const.                 
                                                            3               4,000                  06/30/04   06/30/04    Parker Elec.                        
                                                            3                 575                  06/30/04   06/30/04    Pearl River Plumbing                
                                                            4               1,725                  06/30/04   06/30/04    Pearl River Plumbing                
 
03-0426   Reconstruction               0-013-006  10/08/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              43,525                  01/16/07     /  /      Institutional Systems               
 
01-1219   Reconstruction               0-013-008  06/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,116                  01/16/07     /  /      Instituional Systems                
 
02-1695   Additions and Alterations    0-013-009  03/16/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0636   Reconstruction               0-013-012  04/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1046   Reconstruction               0-013-013  08/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0178   Reconstruction               0-013-014  11/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC05-001        4,004                  11/06/18   01/02/19    FANSHWE, INC.                       
                                                            EC05-002            0                  11/06/18   01/02/19    ROCKLAND ELECTRIC                   
                                                            EC05-005         -471                  07/23/19   07/24/19    FANSHAWE, INC.                      
                                                            EC06-002            0                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            EC06-006       -2,819                  07/23/19   07/23/19    FANSHAWE, INC.                      
                                                            EC06-010       -2,500                  07/23/19   07/23/19    FANSHAWE, INC.                      
                                                            GC01-008      -20,000                  07/23/19   07/24/19    GTS CONSTRUCTION GROUP              
                                                            GC01-010       -7,000                  07/23/19   07/24/19    GTS CONSTRUCTION CORP.              
                                                            MC03-001            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            MC03-003       -3,293                  07/23/19   07/23/19    JOE LOMBARDO PLUMB,HEAT & COOLING OF
                                                            MC03-006            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            PC04-005         -513                  07/23/19   07/23/19    JPE LOMARDO PLUMB,HEAT & COOLING INC
 
19-0181   Reconstruction               0-013-015  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            PC05013         1,514                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
 
20-1786   Reconstruction               0-013-016  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Woodglen Elementary:
98-0900   Reconstruction               0-016-004  04/28/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0283   Alterations                  0-016-005  11/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0427   Reconstruction               0-016-008  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0637   Reconstruction               0-016-010  04/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0804   Reconstruction               0-016-012  10/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1924   Reconstruction               0-016-013  10/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADGC0302            0                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            EC07-005       -1,500                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            GC03-002      -21,159                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            MC05-002        4,061                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            MC05-012       -1,500                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            PC06-003       -1,500                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING, HEATING & COO
 
17-1646   Reconstruction               0-016-014  02/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADEC0803            0                  11/23/20   02/05/21    FANSHAWE, INC.                      
                                                            EC08-005       -7,300                  11/23/20   02/05/21    FANSHAWE, INC.                      
 
19-0182   Reconstruction               0-016-015  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            005-008         4,195                  05/21/21   08/13/21    JOE LOMBARDO PLUMBING               
                                                            PC005002        2,234                  05/20/21   08/13/21    Joe Lombardo Plumbing and Heating   
                                                            PC05015         4,152                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
 
20-1787   Reconstruction               0-016-016  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1214FP Reconstruction               0-016-FP1  09/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lakewood Elementary School:
91-0109   Reconstruction               0-017-002  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1443   Additions and Alterations    0-017-004  06/21/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0514   Additions and Alterations    0-017-005  02/12/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0428   Reconstruction               0-017-007  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1220   Reconstruction               0-017-008  06/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,116          11,116  01/16/07   12/28/07    Instituional Systems                
                                                            3              43,525          43,525  01/16/07   Disapproved Ins6itutional Systems               
 
07-0638   Reconstruction               0-017-009  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4              925                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-5              310                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            MC-6            6,440                  08/07/09     /  /      TM BRENNAN CONTRACTORS INC          
 
11-0805   Reconstruction               0-017-010  10/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0179   Reconstruction               0-017-011  11/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD02-001            0                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            AD02-006            0                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            AD02-007            0                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            AD03-003            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            AD03-005            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            AD04-001            0                  11/28/18   01/07/19    JOSEPH LOMBARDO PLUMBING,HEATING &CO
                                                            AD04-003            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            AD06-001            0                  11/28/18   01/07/19    FANSHAWE, INC.                      
                                                            EC05-007       -2,500                  07/23/19   07/24/19    FANSHAWE, INC.                      
                                                            EC06-008       -1,459                  07/23/19   07/23/19    FANSHAWE, INC.                      
                                                            EC06-012       -2,500                  07/23/19   07/23/19    FANSHAWE, INC.                      
                                                            GC02-003       -1,051                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            GC02-004       -1,639                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            GC02-006       -2,800                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            GC02-007      -29,560                  11/06/18   01/02/19    TITAN ROOFING, INC.                 
                                                            GC02-009       -3,560                  07/23/19   07/24/19    TITAN ROOFING, INC.                 
                                                            GC02-012       -3,383                  07/23/19   07/24/19    TITAN ROOFING, INC.                 
                                                            MC03-005       -1,399                  07/23/19   07/23/19    JOE LOMBARDO PLUMB,HEAT & COOLING OF
                                                            PC04-002       -2,112                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            PC04-003        2,879                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            PC04-004       -2,646                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            PC04-006         -597                  07/23/19   07/23/19    JOE LOMBARDO PLUMB,HEAT & COOLING,IN
 
19-0183   Reconstruction               0-017-012  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            05-004          1,613                  05/20/21   08/13/21    JOE LOMBARDO PLUMBING               
 
20-1788   Reconstruction               0-017-013  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1211FP Reconstruction               0-017-FP1  09/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School South:
92-0976   Reconstruction               0-018-003  05/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1039   Reconstruction               0-018-004  05/20/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1229   Reconstruction               0-018-005  05/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0017   Reconstruction               0-018-007  07/28/00  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0085   Reconstruction               0-018-008  08/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0845   Reconstruction               0-018-010  03/06/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1242   Additions and Alterations    0-018-011  06/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              68,875                  08/08/05   08/15/05    Pearl River Plumbing                
                                                            1               5,905                  08/08/05     /  /      GTL Construction                    
                                                            1               3,531                  08/08/05   08/15/05    Pearl River Plumbing Heating        
                                                            2               9,403                  08/08/05     /  /      GTL Construction                    
                                                            2               9,403                  12/08/05   07/26/06    GTL CONSTRUCTION, LLC.              
                                                            3              10,961                  08/08/05     /  /      GTL Construction                    
 
00-0119   Reconstruction               0-018-012  10/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0429   Reconstruction               0-018-013  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1441   Reconstruction               0-018-014  04/13/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0389   Reconstruction               0-018-015  02/21/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0639   Reconstruction               0-018-017  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADT-2           8,543                  05/12/10   12/22/10    ADT SECURITY SERVICES               
                                                            EC-5            2,559                  10/23/09   12/28/09    FANSHAWE INC d/b/a ROCKLAND ELECTRIC
                                                            GC-1                0                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-14            -330                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-17           3,714                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            GC-3           17,895                  10/30/09   12/29/09    AARK CONTRACTORS INC                
                                                            MC-8           -5,000                  08/07/09   09/18/09    TM BRENNAN CONTRACTORS INC          
                                                            SMC-1          10,000                  05/12/10   12/22/10    PEARL RIVER P/H/E dba BERTUSSI'S    
 
07-0643   Reconstruction               0-018-018  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SGC-2           6,750                  10/23/09   12/28/09    ETRE ASSOCIASTES INC                
 
11-0806   Reconstruction               0-018-019  10/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1898   Reconstruction               0-018-020  11/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01BSHS01            0                  10/12/17   11/10/17    Pearl River Plumbing Heating & Elect
                                                            SHS-001         2,793                  10/12/17   11/10/17    Fanshawe Inc.                       
 
16-0929   Reconstruction               0-018-021  01/20/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-GC-04            0                  11/30/17   12/15/17    Pearl River P/H/E dba Bertussi's    
                                                            AD-GC-06            0                  11/30/17   12/15/17    Pearl River P/H/E dba Bertussi's    
                                                            GC-001         -1,686                  11/30/17   12/15/17    Pearl River P/H/E dba Bertussi's    
 
17-1925   Reconstruction               0-018-023  10/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADEC0701            0                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            ADEC0702            0                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            ADEC0703            0                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            ADEC0704            0                  11/23/20   02/04/21    SHAWE, INC.                         
                                                            ADGC0101            0                  11/23/20   01/29/21    MAK GROUP, LLC                      
                                                            ADGC0401            0                  11/23/20   01/29/21    MACE CONSTRACTING CORP.             
                                                            ADMC0501            0                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            EC07-002       11,271                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            EC07-003       -1,520                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            GC01-001       -2,998                  11/23/20   01/29/21    MAK GROUP, LLC                      
                                                            GC01-002       -7,500                  11/23/20   01/29/21    MAK GROUP, LLC                      
                                                            GC01-003      -14,055                  11/23/20   01/29/21    MAK GROUP, LLC                      
                                                            MC05-005        7,558                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            MC05-006        6,555                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            MC05-007       18,026                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            MC05-008        1,224                  01/05/21   03/12/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            MC05-009        3,517                  03/18/21   03/18/21    Joe Lombardo Plumbing, Heating & Coo
                                                            MC05-010        3,645                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            MC05-011        2,923                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            PC06-001      -10,000                  11/23/20   02/05/21    JOE LOMBARDO PLUMBING,HEATING & COOL
 
17-1647   Reconstruction               0-018-024  02/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADEC0804            0                  11/23/20   02/05/21    FANSHAWE, INC.                      
                                                            EC08-001       82,418                  11/23/20   02/05/21    FANSHAWE, INC.                      
                                                            EC08-003       -8,450                  11/23/20   02/05/21    FANSHAWE, INC.                      
 
19-0184   Reconstruction               0-018-025  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            05-006          2,178                  05/21/21   08/13/21    JOE LOMBARDO PLUMBING               
                                                            ADSC0101            0                  04/26/21   08/06/21    LANDSCAPE UNLIMITED, INC.           
                                                            ADSC0101            0                  04/26/21   08/06/21    LANDSCAPE UNLIMITED, INC.           
                                                            ADSC0102            0                  04/26/21   08/06/21    LANDSCAPE UNLIMITED, INC.           
                                                            ADSC0102            0                  04/26/21   08/06/21    LANDSCAPE UNLIMITED, INC.           
                                                            SC01-003        1,575                  04/26/21   08/06/21    LANDSCAPE UNLIMITED, INC.           
 
22-0700   Reconstruction               0-018-028  01/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1215FP Reconstruction               0-018-FP1  09/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Strawtown Elementary:
92-1230   Reconstruction               0-019-002  05/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0809   Reconstruction               0-019-004  06/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0016   Reconstruction               0-019-007  08/24/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0430   Reconstruction               0-019-008  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0810   Reconstruction               0-019-009  06/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0470   Reconstruction               0-019-010  01/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0640   Reconstruction               0-019-011  04/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-10           4,073                  10/30/09   12/29/09    AARK CONTRACTORS INC                
 
11-1075   Reconstruction               0-019-012  09/04/12  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0647   Reconstruction               0-019-013  01/18/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-GC-01            0                  11/30/17   12/15/17    Gianfia Corp.                       
 
17-0180   Reconstruction               0-019-014  11/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD01-002            0                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            AD01-003            0                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            AD03-007            0                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            AD05-001            0                  11/06/18   01/02/19    ROCKLAND ELECTRIC                   
                                                            EC05-002        4,282                  11/06/18   01/02/19    ROCKLAND ELECTRIC                   
                                                            GC01-001          467                  11/06/18   01/02/19    GTSCONSTRUCTION CORP.               
                                                            GC01-002       -1,367                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            GC01-004        3,801                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            GC01-005        5,134                  11/06/18   01/02/19    GTS CONSTRUCTION CORP.              
                                                            MC03-001      -20,556                  11/06/18   01/02/19    LOMBARDO PLUMBING,HEATING & COOLING 
                                                            MC03-002       -1,235                  07/23/19   07/23/19    JOE LOMBARDO PLUMB,HEAT & COOLING OF
 
16-1224   Reconstruction               0-019-015  03/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1648   Reconstruction               0-019-016  02/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADEC0801            0                  11/23/20   02/04/21    FANSHAWE, INC.                      
                                                            ADEC0802            0                  11/23/20   02/05/21    FANSHAWE, INC.                      
                                                            EC08-002       12,283                  11/23/20   02/05/21    FANSHAWE, INC.                      
                                                            EC08-004         -780                  11/23/20   02/05/21    FANSHAWE, INC.                      
 
19-0185   Reconstruction               0-019-017  12/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC05010        -2,376                  05/20/21   08/13/21    Joe Lomardo Plumbing and Heating    
 
20-1789   Reconstruction               0-019-018  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Shed:
03-1080   New Construction             2-027-001  03/16/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBus Garage - use 5-022:
10-1113   Reconstruction               5-005-003  06/08/11  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1926   Reconstruction               5-005-004  10/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC03-001       -5,000                  11/23/20   01/29/21    TITAN ROOFING, INC.                 
                                                            GC04-002       -2,500                  11/23/20   01/29/21    MACE CONTRACTING CORP.              
                                                            MC05-001        2,869                  11/23/20   02/04/21    JOE LOMBARDO PLUMBING,HEATING & COOL
 
19-0186   Reconstruction               5-005-005  12/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
94-1546   Reconstruction               5-022-002  06/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0431   Reconstruction               5-022-004  10/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ South High School:
06-0369   New Construction             7-030-001  10/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          South High School Parking:
11-0017   New Construction             7-033-001  11/20/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ NHS:
11-1455   New Construction             7-034-001  11/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          North HS Concession Stand:
12-0456   New Construction             7-035-001  03/26/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          NHS Guard Booth:
12-0929   New Construction             7-036-001  05/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          NHS Guard Booth #2:
15-0582   New Construction             7-038-001  01/04/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
94-1506   Reconstruction               7-999-001  06/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0849   Reconstruction               7-999-002  02/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1167   Reconstruction               7-999-007  08/12/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0180   Reconstruction               7-999-008  01/04/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1499   Reconstruction               7-999-009  06/14/17  NO CHANGE ORDERS ON ELECTRONIC FILE
15-2004   Reconstruction               7-999-010  08/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADEC1CN2            0                  11/30/17   12/14/17    Fanshawe Inc dba Rockland Electric  
                                                            ADEC1CNH            0                  11/30/17   12/14/17    Fanshawe Inc dba Rockland Electric  
                                                            ADEC1CS2            0                  11/30/17   12/14/17    Fanshawe Inc dba Rockland Electric  
                                                            ADEC1CST            0                  11/30/17   12/14/17    Fanshawe Inc dba Rockland Electric  
                                                            ADEC1CWE            0                  11/30/17   12/14/17    Fanshawe, Inc. dba Rockland Electric
                                                            ADGC1CBW            0                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            ADGC1CNH            0                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            ADGC1CWE            0                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            COEC1CAL       -3,407                  11/30/17     /  /      Fanshawe Inc dba Rockland Electric  
                                                            COGC1CBE       -5,500                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            COGC1CNH         -775                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            COGC1CS2       14,393                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            COGC1CST        8,816                  11/30/17   12/14/17    APS Contracting Inc.                
                                                            COGC1CW2        2,780                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            COGC1CW3       -1,308                  11/30/17   12/14/17    APS Contracting, Inc.               
                                                            COGC1CWE       28,537                  11/30/17   12/14/17    APS Contracting Inc.                
 
23-0633FA Reconstruction               7-999-011  11/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXSt. Augustine Schl (2015 no lease):
13-0470   Reconstruction               8-037-L01  10/25/13  NO CHANGE ORDERS ON ELECTRONIC FILE

NANUET UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-01-08-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Miller Elementary:
96-1247   Additions and Alterations    0-001-004  04/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1362   Additions and Alterations    0-001-005  07/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0558   Reconstruction               0-001-006  03/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1388   Reconstruction               0-001-007  07/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1437   Reconstruction               0-001-008  07/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1077   Additions and Alterations    0-001-009  05/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0334   Reconstruction               0-001-010  10/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0447   Reconstruction               0-001-011  01/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1060   Reconstruction               0-001-012  02/12/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0065   Reconstruction               0-001-013  07/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0989   Reconstruction               0-001-014  05/09/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0974   Reconstruction               0-001-015  08/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0555   Reconstruction               0-001-016  02/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003              0                  07/02/12   12/20/12    C&M DOOR CONTROLS                   
 
10-1387   Reconstruction               0-001-017  08/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1507   Reconstruction               0-001-018  05/07/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0831   Reconstruction               0-001-019  11/04/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GCCO01          9,329                  09/19/16   10/26/16    Optimus                             
 
18-1325   Reconstruction               0-001-021  03/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -10,000                  11/25/19   12/17/19    MEHL ELECTRIC CO.,INC.              
 
19-0862   Reconstruction               0-001-022  01/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           8,213                  12/08/21   12/16/22    Mehl Elec Comp Inc                  
                                                            MC-01          -7,000                  12/08/21   12/16/22    Lombardo Plumb&HeatofRockland Inc   
                                                            MC-02         -35,902                  12/08/21   12/16/22    Lombardo plumb&Heatof Rockland Inc  
                                                            MC-03           3,758                  12/08/21   12/16/22    Lombardo Plumb&Heatof Rockland Inc  
                                                            MC-04          74,652                  12/08/21   12/16/22    Lombardo Plumb&HeatofRockland Inc   
                                                            MC-05           9,259                  12/08/21   12/16/22    Lombardo Plumb&heatof Rockland Inc  
                                                            MC-06           6,430                  12/08/21   12/16/22    Lombardo Plumb&Heatof Rockland Inc  
                                                            MC-CO-07       23,456                  12/08/21   12/16/22    Lombardo Plumb&Heat of Rockland Inc 
                                                            MC-CO-08      -20,000                  12/08/21   12/16/22    Joe lombardo plumb&HeatofRocklandInc
 
22-0165FC Reconstruction               0-001-023  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1714   Reconstruction               0-001-024  07/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0681FP Reconstruction               0-001-FP1  03/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Highview Elementary:
94-1337   Reconstruction               0-002-004  05/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1330   Reconstruction               0-002-005  07/06/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0559   Reconstruction               0-002-006  03/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1361   Reconstruction               0-002-007  07/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0064   Additions and Alterations    0-002-008  05/07/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL-3          -25,000                  08/05/05   08/17/05    Habiterra Architecture and Landscape
 
03-0448   Reconstruction               0-002-009  01/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1061   Reconstruction               0-002-010  02/12/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0990   Reconstruction               0-002-011  05/09/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0975   Reconstruction               0-002-012  08/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0556   Reconstruction               0-002-013  02/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-004              0                  07/02/12   12/20/12    C&M DOOR CONTROLS                   
 
10-1388   Reconstruction               0-002-014  08/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -10,655                  09/30/13   10/24/13    C&M Door Controls, Inc.             
 
13-1423   Reconstruction               0-002-016  06/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0832   Reconstruction               0-002-017  11/04/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GCAD01              0                  09/19/16   10/21/16    Optimus                             
                                                            GCCO02         37,895                  09/19/16   10/26/16    Optimus                             
 
18-1326   Reconstruction               0-002-018  03/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-AD01             0                  02/03/20   03/03/20    MEHL ELECTRIC CO.,INC.              
                                                            MC-AD01             0                  11/25/19   12/17/19    PEARL RIVER PLUMBING,HEAT & ELECTRIC
 
22-0163   Reconstruction               0-002-019  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nanuet Senior High:
98-1364   Reconstruction               0-003-006  07/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0560   Reconstruction               0-003-007  03/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1390   Reconstruction               0-003-008  07/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1436   Reconstruction               0-003-009  07/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1075   Reconstruction               0-003-010  03/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0335   Additions and Alterations    0-003-012  07/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0080   Reconstruction               0-003-013  03/26/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001          6,128                  03/04/04   03/15/04    Cali Brothers                       
                                                            03-001         -5,000                  04/05/04   04/08/04    Pearl River Plumbing                
                                                            04-001            395                  03/04/04   03/25/04    Fanshawe Inc                        
 
03-0449   Reconstruction               0-003-014  01/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1062   Reconstruction               0-003-015  02/12/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1427   Reconstruction               0-003-016  07/19/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0991   Reconstruction               0-003-017  05/09/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0838   Reconstruction               0-003-018  04/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,351                  01/19/10   05/27/10    JAC MECHANICAL SERVICES             
                                                            001            -4,441                  01/19/10   05/27/10    FANSHAWE INC                        
                                                            001            -5,000                  05/03/10   08/17/10    PEARL RIVER PLUMBING & HEATING INC  
                                                            002              -559                  01/19/10   05/27/10    FANSHAWE INC                        
 
09-0976   Reconstruction               0-003-020  08/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0557   Reconstruction               0-003-021  02/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1389   Reconstruction               0-003-022  08/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0875   Reconstruction               0-003-023  09/20/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001        -23,286                  04/09/18   04/11/18    HUSH Maintenance, Corp.             
                                                            EC-002         11,000                  04/09/18   04/11/18    HUSH Maintenance, Corp.             
                                                            EC-003              0                  04/09/18   04/11/18    HUSH Maintenance, Corp.             
 
13-1508   Reconstruction               0-003-024  05/07/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1485   Reconstruction               0-003-026  05/19/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              3,900                  09/12/19   09/13/19    APEX DEVELOPMENT INC.               
                                                            02              8,837                  09/12/19   09/13/19    APEX DEVELOPMENT INC.               
 
17-0928   Reconstruction               0-003-028  04/24/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AD-05          -3,124                  03/18/19   03/21/19    PEARL RIVER PLUMB.& HEAT& ELECTRIC  
                                                            AD-06          -1,570                  03/18/19   03/21/19    PEARL RIVER PLUMBING & HEAT & ELECT.
                                                            CO-15           2,888                  03/18/19   03/21/19    FANSHAWE INC. DBA ROCKLAND ELECTRIC 
                                                            CO-15           3,881                  03/18/19   03/21/19    FANSHAWE INC. DBA ROCKLAND ELECTRIC 
                                                            CO-17           7,029                  03/18/19   03/21/19    FANSHAWE INC DBA ROCKLAND ELECTRIC. 
                                                            CO-18             798                  03/18/19   03/21/19    FANSHAWE INC. DBA ROCKLAND ELECTRIC.
                                                            CO-23           6,002                  03/18/19   03/21/19    ML,INC                              
                                                            CO-24             235                  03/18/19   03/21/19    ML, INC                             
                                                            CO-25          16,515                  03/18/19   03/21/19    ML, INC                             
                                                            CO-26           1,706                  03/18/19   03/21/19    ML, INC                             
                                                            CO-27           1,172                  03/18/19   03/21/19    ML,INC                              
                                                            EC-AD-02            0                  12/03/18   02/04/19    FANSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-AD-04            0                  12/03/18   02/01/19    FANSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-AD03             0                  12/03/18   02/01/19    FANSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-CO-01        8,000                  12/03/18   02/04/19    FANSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-CO-02        3,850                  12/03/18   02/01/19    FAWSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-CO-03        5,670                  12/03/18   02/04/19    FANSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-CO-04        5,487                  12/03/18   02/04/19    FANSHAWE INC D/B/A ROCKLAND ELECTRIC
                                                            EC-CO-05        4,936                  12/03/18   02/01/19    FANSHAWE INC D/B/A ROCKLAND ELECTRIC
                                                            EC-CO-06        3,338                  12/03/18   02/01/19    FANSHAWE INC D/B/AROCKLAND ELEC     
                                                            EC-CO-07        1,996                  12/03/18   02/01/19    FANSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-CO-08        1,279                  12/03/18   02/01/19    FANSHAWE INC D/B/A ROCKLAND ELEC    
                                                            EC-CO09         6,615                  12/06/18   01/22/19    ROCKLAND ELECTRIC                   
                                                            EC-CO11         4,978                  01/24/19   02/22/19    ROCKLAND ELECTRIC                   
                                                            EC-CO12         1,253                  01/24/19   02/22/19    ROCKLAND ELECTRIC                   
                                                            EC-CO13         1,738                  01/24/19   02/22/19    ROCKLAND ELECTRIC                   
                                                            EC-CO14         1,409                  01/24/19   02/22/19    ROCKLAND ELECTRIC                   
                                                            ECCO10            299                  12/06/18   01/22/19    ROCKLAND ELECTRIC                   
                                                            GC-01             448                  12/03/18   01/28/19    ML INC                              
                                                            GC-02           6,171                  12/03/18   02/25/19    ML INC                              
                                                            GC-03          22,776                  12/03/18   01/28/19    ML INC                              
                                                            GC-04           5,074                  12/03/18   01/28/19    ML INC                              
                                                            GC-05           1,284                  12/03/18   01/28/19    ML INC                              
                                                            GC-06           3,085                  12/03/18   02/25/19    ML INC                              
                                                            GC-07           4,469                  12/03/18   01/28/19    ML INC                              
                                                            GC-08           3,029                  12/03/18   01/28/19    ML INC                              
                                                            GC-09           3,927                  12/03/18   01/28/19    ML INC                              
                                                            GC-10             897                  12/03/18   01/28/19    ML INC                              
                                                            GC-11           6,114                  12/03/18   01/28/19    ML INC                              
                                                            GC-12           2,524                  12/03/18   01/28/19    ML INC                              
                                                            GC-13          20,981                  12/03/18   01/28/19    ML INC                              
                                                            GC-14           4,319                  12/03/18   01/28/19    ML INC                              
                                                            GC-CO15         2,928                  01/24/19   02/22/19    ML INC.                             
                                                            GC-CO16         2,176                  01/24/19   02/22/19    ML INC.                             
                                                            GC-CO17         9,144                  01/24/19   02/22/19    ML INC.                             
                                                            GC-CO18         6,171                  01/24/19   02/22/19    ML INC.                             
                                                            GC-CO19         4,936                  01/24/19   02/22/19    ML INC.                             
                                                            GC-CO20         5,189                  01/24/19   03/01/19    ML INC.                             
                                                            GC-CO21        11,080                  01/24/19   02/22/19    ML INC.                             
                                                            GC-CO22         2,131                  01/24/19   02/22/19    ML INC.                             
                                                            GCAD01              0                  12/03/18   01/28/19    ML INC                              
                                                            GCAD02              0                  12/03/18   01/28/19    ML INC                              
                                                            GCAD03              0                  12/03/18   01/28/19    ML INC                              
                                                            GCAD04              0                  12/03/18   01/28/19    ML INC                              
                                                            GCAD05              0                  12/03/18   01/28/19    ML INC                              
                                                            HC-CO01        24,629                  07/05/19   07/09/19    SUBURBAN RESTORATION CO.            
                                                            MC-01             729                  03/18/19   03/21/19    PEARL RIVER PLUMBING & HEAT & ELECT.
                                                            MC-AD-01            0                  12/03/18   02/01/19    PEARL RIVER PLUMBING HEATING & ELEC 
                                                            MC-AD-02            0                  12/03/18   02/01/19    PEARL RIVER PLUMBING HEATING &ELEC  
                                                            MC-AD03             0                  01/24/19   02/22/19    PEARL RIVER PLUMBING,HEATING,ELECTRI
                                                            MC-AD03             0                  01/24/19   02/22/19    PEARL RIVER PLUMB,HEAT & ELECTRIC   
                                                            PC-01               0                  12/03/18   02/01/19    JOSEPH LOMBARDO PLUMBING &COOLING IN
                                                            PC-02               0                  12/03/18   02/01/19    JOSEPH LOMBARDO PLUMBIN &COOLIN     
                                                            PC-03               0                  12/03/18   02/01/19    JOSEPH LOMBARDO PLUMBING AND COOLING
                                                            PC-04               0                  12/03/18   02/01/19    JOSEPH LOMBARDO PLUMBING HEAT &COOL 
                                                            PC-CO-01        6,364                  12/03/18   02/01/19    JOSPH LMBARDO PLMBING HEATING COOLIN
                                                            PC-CO-02        9,616                  12/03/18   02/01/19    JOSEPH LMBARDO PLMBING HEATNG COOLIN
                                                            PC-CO-03        4,314                  12/03/18   02/01/19    JOSEPH LMBARDO PLMBING HEATING&COOLI
                                                            PC-CO-04        4,331                  12/03/18   02/01/19    JOSEPH LMBARDO PLMBING HEATING&COOLI
                                                            PC-CO-05        5,550                  12/03/18   02/01/19    JOSEPH LMBARDO PLMBING HEATING&COOLI
                                                            PC-CO-07        5,955                  12/03/18   02/01/19    JOSEPH LOMBARDO PLBING&HEAT&COOLNG  
                                                            PC-CO-08        5,162                  12/03/18   02/01/19    JOSEPH LOMBARDO HEATING &COOLIN INC 
                                                            PC-CO09         6,900                  01/24/19   02/22/19    JOSEPH LOMBARDO PLUMB,HEAT, ELECTRIC
                                                            PC-CO10         5,642                  01/24/19   02/22/19    JOSEPH LOMBARDO PLUMB, HEAT,ELECTRIC
 
18-1327   Reconstruction               0-003-030  03/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -15,000                  11/25/19   12/17/19    MEHL ELECTRIC CO.,INC.              
                                                            GC-AD01             0                  10/15/19   10/22/19    ZN CONSTRUCTION, LLC                
                                                            GC-AD02             0                  10/15/19   10/22/19    ZN CONSTRUCTION, LLC                
                                                            GC-AD03             0                  10/15/19   10/22/19    ZN CONSTRUCTION, LLC                
                                                            GC-AD04             0                  10/15/19   10/22/19    ZN CONSTRUCTION, LLC                
                                                            GC-AD05             0                  10/15/19   10/22/19    ZN CONSTRUCTION, LLC                
                                                            GC-CO01        -1,349                  10/15/19   10/22/19    ZN CONSTRUCTION, LLC                
                                                            MC-01           7,423                  11/25/19   12/17/19    PEARL RIVER PLUMBING,HEAT & ELECTRIC
                                                            MC-AD01             0                  10/15/19   10/18/19    PEARL RIVER PLUMBING,HEAT & ELECTRIC
                                                            MC-AD02             0                  11/25/19   12/17/19    PEARL RIVER PLUMBING,HEAT & ELECTRIC
 
21-0703FB Reconstruction               0-003-031  03/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            15,237                  10/18/22   12/20/23    Paladino Conc Create Corp           
                                                            001            -3,086                  10/25/22   06/27/23    Fanshawe Inc dba Rockland Elec      
                                                            001           144,720                  10/25/22     /  /      Turco Gulf Inc                      
                                                            001           -27,865                  10/25/22   12/19/23    Renu Contr&Restore inc              
                                                            001            15,237                  12/09/22   12/19/23    Paladino Conc Creation Corp         
                                                            001            14,000                  12/09/22   12/20/23    A-Turf                              
                                                            002            44,390                  10/18/22     /  /      Turco Golf Inc                      
                                                            002             7,944                  10/25/22   12/19/23    Paladino Conc Creation Corp         
                                                            002             7,944                  01/20/22   12/20/23    Paladino Conc Creation Corp         
                                                            003            25,340                  12/09/22   12/20/23    Paladino Conc Creation Corp         
                                                            003            90,505                  12/09/22   12/20/23    Turco Golf Inc                      
                                                            004            67,068                  12/09/22     /  /      Paladino Conc Creation Corp         
                                                            005            13,345                  12/09/22   12/22/23    Paladino Conc Creation Corp         
                                                            EC01-01        44,120                  10/18/22   12/14/23    Fanshawe Inc dba Rockland Elec      
                                                            SC04-01        10,677                  10/18/22     /  /      Dant Clayton                        
                                                            SW01-01       144,720                  10/18/22     /  /      Turco Golf Inc                      
                                                            q02            32,748                  12/09/22   11/17/23    Fanshawe Inc dba Rockland Elec      
 
21-1639   Reconstruction               0-003-032  07/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0166FA Reconstruction               0-003-034  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1462   Reconstruction               0-003-035  05/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0682FP Reconstruction               0-003-FP1  03/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Barr Middle School:
98-1363   Reconstruction               0-004-003  07/15/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0561   Reconstruction               0-004-004  03/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1389   Reconstruction               0-004-005  07/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1438   Reconstruction               0-004-006  07/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1078   Additions and Alterations    0-004-007  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0065   Reconstruction               0-004-008  05/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0450   Reconstruction               0-004-009  01/21/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0992   Reconstruction               0-004-011  05/09/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0977   Reconstruction               0-004-012  08/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0558   Reconstruction               0-004-013  02/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002              0                  07/02/12   12/20/12    C&M DOOR CONTROLS                   
 
10-1390   Reconstruction               0-004-014  08/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002        -15,000                  09/30/13   10/24/13    C&M Door Controls, Inc.             
 
13-1509   Reconstruction               0-004-015  05/07/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0833   Reconstruction               0-004-017  11/04/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BMSGC-02      -25,000                  09/12/19   10/04/19    OPTIMUS INSTALLATION                
                                                            EC-AD-01       -2,494                  09/12/19   09/16/19    FANSHAWE INC.                       
                                                            MC-CO-01      -15,000                  12/09/16   01/06/17    Joe Lombardo P&H of Rockland, Inc.  
 
15-1915   Reconstruction               0-004-018  07/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO-01       50,000                  08/04/17   08/10/17    Apex Development, Inc.              
 
22-0164   Reconstruction               0-004-019  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1463   Reconstruction               0-004-020  05/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0680FP Reconstruction               0-004-FP1  12/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Electrical Shed:
21-0704   New Construction             2-020-001  03/25/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Public Library:
12-1007   Reconstruction               6-005-003  06/18/13  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0939   Reconstruction               6-005-004  03/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               557                  08/17/20   10/28/20    BJB CONSTRUCTION CORP.              
 
19-0198   Reconstruction               6-005-005  10/16/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,957                  07/12/21   01/13/22    IJZ Associates, Inc                 
                                                            002               534                  07/12/21   01/13/22    IJZ Associates Inc                  
                                                            003             1,725                  07/12/21   01/13/22    IJZ Associates                      
 
23-0059   Reconstruction               6-005-006  08/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Building:
98-1703   New Construction             7-007-001  10/22/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ HS:
06-1677   New Construction             7-010-001  09/12/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Land Purchse (23 StructuresRemoved):
06-0690   New Construction             7-011-001  03/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1215   Reconstruction               7-011-002  07/15/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nanuet Outdoor Recreation Center:
14-0834   Reconstruction               7-012-002  11/04/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1210   Reconstruction               7-012-003  05/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-01               0                  03/18/19   03/19/19    VINCO BUILDERS                      
                                                            AD-02               0                  03/18/19   03/19/19    VINCO BUILDERS                      
                                                            GC-CO01         2,160                  04/03/19   04/11/19    VINCO BUILDERS                      
                                                            GC-CO04         3,496                  05/14/19   05/15/19    VINCO BUILDERS                      
                                                            GC02            3,365                  04/03/19   04/18/19    VINCO BUILDERS                      
 

          Children of Promise Equestrian Ring:
12-0535   New Construction             7-017-001  05/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          NOEC Horse Stalls:
13-0025   New Construction             7-018-001  07/12/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          NOEC Greenhouse:
13-1351   New Construction             7-019-001  09/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
98-1165   Reconstruction               7-999-001  05/06/99  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0139   Reconstruction               7-999-003  10/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         21,885                  02/26/18   03/07/18    A+ Technology & Security Solutions  
                                                            EC-002         23,953                  02/26/18   03/07/18    A+ Technology & Security Solutions  
 

NORTH ROCKLAND/HAVERSTRAW-STONY PT STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-02-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Farley Elementary:
03-1549   Reconstruction               0-003-007  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0               3    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0               3    /  /       /  /                                          
                                                            01            -44,900                  02/16/05   02/18/05    Milcon Construction                 
                                                            02             14,000                  02/16/05   02/18/05    Milcon Construction                 
                                                            03              6,100                  06/10/05   06/30/05    Milcon Construction Corp            
                                                            RC-04       1,178,300                  05/20/05   06/03/05    Milcon Construction Corp            
                                                            RC-05          11,900                  07/22/05   07/26/05    Milcon Construction                 
                                                            RC-06          15,000                  02/06/06   12/18/06    Milcon Construction                 
                                                            RC-07           6,400           6,400  03/28/06   Disapproved Milcon Construction                 
                                                            RC-08           5,800           5,800  03/28/06   Disapproved Milcon Construction                 
 
10-1357   Reconstruction               0-003-008  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1540   Reconstruction               0-003-009  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2084   Reconstruction               0-003-010  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1686   Reconstruction               0-003-011  08/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0322FP Reconstruction               0-003-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Rockland High School Ext.:
93-1221   Additions and Alterations    0-007-005  06/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1368   Reconstruction               0-007-006  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1544   Reconstruction               0-007-008  01/23/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            2,936                  01/28/03   02/05/03    NEI/Naber Elec.                     
                                                            GC-1          -15,000                  12/23/02   01/10/03    Piazza Brothers                     
                                                            GC-2          -13,800                  12/23/02   01/10/03    Piazza Brothers                     
                                                            PC-1            3,990                  01/28/03   02/05/03    Thomas Kempton                      
                                                            PC-2            3,200                  05/02/03   05/05/03    Thomas Kempton                      
 
01-0285   Reconstruction               0-007-010  02/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1358   Reconstruction               0-007-013  03/15/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3A              7,950           7,950  07/25/13   07/25/13    Siemens Industries                  
 
13-1541   Reconstruction               0-007-014  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2085   Reconstruction               0-007-015  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0323FP Reconstruction               0-007-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Haverstraw Elementary:
97-0560   Reconstruction               0-009-008  12/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0713   Reconstruction               0-009-009  12/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,000                  06/23/04   06/28/04    Pearl River Plumbing                
                                                            2               4,850                  06/23/04   06/28/04    Pearl River Plumbing                
                                                            3              14,800                  06/23/04   06/28/04    Pearl River Plumbing                
                                                            4               5,929                  06/23/04   06/28/04    Pearl River Plumbing                
 
99-1139   Reconstruction               0-009-010  06/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-11           1,309                  12/12/02   01/07/03    Ray S. Pantel                       
                                                            EC-13             870                  03/20/03   03/28/03    Ray S. Pantel                       
                                                            EC-14          -5,000                  10/10/03   11/05/03    Ray S. Pantel                       
                                                            EC-3            1,007                  11/29/02   01/02/03    Ray S. Pantel                       
                                                            EC-4            2,416                  12/23/02   01/10/03    Ray S. Pantel                       
                                                            G-15           -7,000                  12/17/03   12/29/03    Helmer Cronin                       
                                                            G-7             1,524                  12/23/02   01/10/03    Helmer Cronin                       
                                                            HC-5           -1,250                  07/28/03   08/04/03    Hauser Brothers                     
 
09-0074   Reconstruction               0-009-013  10/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,225                  06/20/12   12/13/12    Fanshawe, Inc. - Rockland Electric  
                                                            2               9,000                  06/20/12   12/13/12    Fanshawe, Inc. - Rockland Electric  
                                                            3               9,000                  06/20/12   12/13/12    Fanshawe, Inc. - Rockland Electric  
                                                            4              -2,074                  06/21/12     /  /      Fanshawe, Inc. - Rockland Electric  
                                                            5               7,633                  06/21/12   12/13/12    Fanshawe, Inc. - Rockland Electric  
                                                            6              -4,440                  06/21/12   12/13/12    Fanshawe, Inc. - Rockland Electric  
                                                            7              -1,080                  06/21/12   12/13/12    Fanshawe, Inc. - Rockland Electric  
                                                            8              -2,000                  06/22/12   12/13/12    Fanshawe, Inc. - Rockland Electric  
 
10-1359   Reconstruction               0-009-014  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1542   Reconstruction               0-009-016  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2086   Reconstruction               0-009-017  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0280   Reconstruction               0-009-018  12/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1687   Reconstruction               0-009-019  08/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gerald F. Neary Elementary:
02-1498   Reconstruction               0-011-004  04/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1360   Reconstruction               0-011-006  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2087   Reconstruction               0-011-007  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0929   Reconstruction               0-011-008  02/16/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXRailroad Ave Schl (Sold 2017):
03-0770   Reconstruction               0-013-001  02/20/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1389   Reconstruction               0-013-002  10/21/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,021                  02/15/07   03/14/07    KG Construction Associates          
 
10-1361   Reconstruction               0-013-003  03/15/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3B              6,550           6,550  07/25/13   07/25/13    Siemens Industries                  
 

          Stony Point Elementary:
92-0463   Additions and Alterations    0-014-005  01/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1452   Reconstruction               0-014-006  07/24/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,613                  06/18/10   08/06/10    VARDON INC                          
                                                            2               6,845                  06/18/10   08/06/10    VARDON INC                          
 
10-1362   Reconstruction               0-014-007  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1543   Reconstruction               0-014-008  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2088   Reconstruction               0-014-009  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Rockland High School:
90-1498   Reconstruction               0-016-007  06/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0073   Reconstruction               0-016-008  09/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0235   Reconstruction               0-016-009  10/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1683   Additions and Alterations    0-016-010  06/16/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1090   Reconstruction               0-016-011  08/30/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1362   Reconstruction               0-016-013  05/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0175   Reconstruction               0-016-015  02/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            4,150                  11/29/02   12/09/02    Ray Pantel Elec.                    
                                                            EC-10           2,236                  12/23/02   01/02/03    Ray Pantel                          
                                                            EC-12           1,750                  03/20/03   03/24/03    Ray Pantel                          
                                                            EC-2            4,174                  11/29/02   12/09/02    Ray Pantel                          
                                                            EC-5            2,236                  11/22/02   01/08/03    Ray Pantel                          
                                                            EC-6              280                  11/22/02   01/08/03    Ray Pantel                          
                                                            EC-7            1,415                  11/22/02   01/08/03    Ray Pantel                          
                                                            EC-8            2,830                  11/22/02   01/08/03    Ray Pantel                          
                                                            EC-9            1,677                  12/02/02   01/02/03    Ray Pantel                          
                                                            G-1            51,480                  12/23/02   01/10/03    Helmer Cronin Const.                
                                                            G-10            6,036                  11/22/02   01/08/03    Helmer Cronin Const.                
                                                            G-11            1,493                  11/22/02   01/08/03    Helmer Cronin Const.                
                                                            G-12            1,819                  11/22/02   01/08/03    Helmer Cronin Const.                
                                                            G-13           -1,000                  12/17/03   12/26/03    Helmer Cronin Const.                
                                                            G-14          -26,452                  12/17/03   12/26/03    Helmer Cronin Const.                
                                                            G-2             2,117                  12/23/02   01/10/03    Helmer Cronin Const.                
                                                            G-3             1,732                  12/23/02   02/21/03    Helmer Cronin Const.                
                                                            G-4             3,850                  12/23/02   02/21/03    Helmer Cronin Const.                
                                                            G-5             1,900                  12/23/02   01/10/03    Helmer Cronin Const.                
                                                            G-6               853                  12/23/02   02/21/03    Helmer Cronin Const.                
                                                            G-8            21,500                  12/23/02   01/10/03    Helmer Cronin Const.                
                                                            G-9               938                  12/23/02   01/10/03    Helmer Cronin Const.                
                                                            HB-3            4,995                  02/03/04   02/03/04    Hauser Brothers                     
                                                            HC-1            1,250                  12/23/02   01/07/03    Hauser Brothers                     
                                                            HC-2            4,700                  12/23/02   01/07/03    Hauser Brothers                     
                                                            HC-4            7,171                  07/28/03   07/29/03    Hauser Brothers                     
                                                            PC-1            5,064                  01/28/03   02/05/03    Thomas Kempton                      
                                                            PC-2           -5,000                  10/10/03   12/22/03    Thomas Kempton                      
                                                            PW-1           15,500                  12/23/02   01/07/03    Urban-Suburban Recreation           
                                                            PW-2            9,638                  12/23/02   01/07/03    Urban-Suburban Recreation           
                                                            PW-3           25,544                  03/12/02   05/06/02    Urban-Suburban Recreation           
                                                            SC-1          104,250                  01/28/03   02/05/03    Mountain View Const.                
                                                            SC-2           80,812                  02/11/02   03/22/02    Mountain View Const.                
                                                            SC-3           19,136                  03/12/02   05/06/02    Mountain View Const.                
                                                            SC-4           -1,654                  12/22/03   12/26/03    Mountain View Const.                
 
00-1868   Additions and Alterations    0-016-016  06/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1071   Reconstruction               0-016-017  05/24/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            04              1,600                  06/10/05   07/20/05    Carjen Fence Co                     
                                                            05             -1,746                  10/21/05   11/08/05    Carjen Fence Co                     
                                                            GC-01           5,000                  06/10/05   07/20/05    carjen Fence Co                     
                                                            GC-02           6,600                  06/10/05   07/20/05    Carjen Fence Co                     
                                                            GC-03           2,400                  06/10/05   07/20/05    Carjen Fence Co                     
                                                            GW-06          -5,000                  03/28/06   07/21/06    Carjen Fence Co                     
 
04-0319   Reconstruction               0-016-018  11/05/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW-04             200                  02/06/06     /  /      Conserv Construction                
                                                            GW-2            4,500                  02/06/06     /  /      Conserv Corp                        
                                                            GW-3           14,212                  10/21/05   11/07/05    Consery Corp                        
 
03-1550   Reconstruction               0-016-019  07/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -6,611                  06/10/05   01/11/06    Eagle Electric                      
                                                            02              5,400                  06/10/05   08/18/05    Eagle electric                      
                                                            03              1,472                  03/28/06   04/21/06    Eagle Electric                      
 
10-1363   Reconstruction               0-016-022  03/15/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,668           5,668  07/25/13   07/25/13    Siemens Industries                  
                                                            2               4,800           4,800  07/25/13   07/25/13    Siemens Industries                  
                                                            4              40,281          40,281  07/25/13   07/25/13    Siemens Industries                  
 
13-1544   Reconstruction               0-016-023  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2089   Reconstruction               0-016-024  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1059   Reconstruction               0-016-026  02/08/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1060   Reconstruction               0-016-027  06/06/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0774   Reconstruction               0-016-028  01/10/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,486                  03/11/22   02/22/23    MDS HVAC-R                          
                                                            1               1,495                  03/11/22   02/22/23    MDS HVAC R                          
                                                            2             -12,240                  03/11/22   02/22/23    MDS HVAC-R Inc                      
                                                            3               7,097                  03/11/22     /  /      MDS HVAC-R Inc                      
 
20-0930   Reconstruction               0-016-029  02/16/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-02            8,933                  07/05/23   12/28/23    FANSHAWE                            
                                                            EC-01           3,851                  07/05/23   12/28/23    FANSHAWE                            
                                                            M-01           12,000                  07/05/23   12/28/23    JOE LOMBARDO P&H                    
                                                            P-01           -3,000                  07/05/23   12/28/23    HAUSER BROS                         
 
21-0441   Reconstruction               0-016-032  11/18/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              40,000                  07/05/23     /  /      BARRETT ROOFS                       
                                                            2               5,781                  07/05/23   01/03/24    BARRETT ROOF                        
                                                            3             157,674                  07/05/23     /  /      BARRETT ROOF                        
                                                            4              58,040                  07/05/23     /  /      BARRETT ROOF                        
 
21-0463   Reconstruction               0-016-033  12/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1354   Reconstruction               0-016-034  06/01/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0909   Reconstruction               0-016-035  02/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0319FP Reconstruction               0-016-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0139   Visual Structural Inspection 0-016-SC1  08/07/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Haverstraw Elementary:
92-0629   Reconstruction               0-024-005  03/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1361   Reconstruction               0-024-006  05/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0284   Reconstruction               0-024-007  02/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1388   Reconstruction               0-024-008  10/21/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              14,400                  11/15/06   01/09/07    Monpat Construction                 
                                                            2               6,400                  02/13/07   03/14/07    Monpat Construction                 
 
08-1453   Reconstruction               0-024-009  07/24/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1364   Reconstruction               0-024-010  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1545   Reconstruction               0-024-011  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2090   Reconstruction               0-024-012  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0321FP Reconstruction               0-024-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Thiells Elementary School:
92-1134   Additions and Alterations    0-025-006  05/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0403   Reconstruction               0-025-008  11/07/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              88,920                  01/28/03   02/11/03    Ed Coupart & Son                    
                                                            2              14,375                  01/28/03   02/11/03    Ed Coupart & Son                    
 
99-0303   Reconstruction               0-025-009  10/07/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1192   Reconstruction               0-025-011  04/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01           -109,600                  02/16/05   02/18/05    Milcon Construction Corp            
                                                            02             29,080                  06/10/05   06/30/05    Milcon Construction                 
                                                            03             18,890                  08/23/06   08/25/06    Milcon Construction                 
 
10-1365   Reconstruction               0-025-012  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1546   Reconstruction               0-025-013  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2091   Reconstruction               0-025-014  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0320FP Reconstruction               0-025-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Willow Grove Elemly (8-030):
13-1548   Reconstruction               0-030-012  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2092   Reconstruction               0-030-013  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1355   Reconstruction               0-030-014  06/01/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1409   Reconstruction               0-030-015  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1688   Reconstruction               0-030-016  08/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fieldstone Middle School:
01-1106SR New Construction             0-031-001  05/23/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01          19,631                  05/19/08     /  /      All Bright Electric                 
                                                            EC-22          17,468                  06/20/12     /  /      All Bright Electric                 
                                                            GC-67          16,804                  05/19/08     /  /      Morris Park Contracting             
                                                            GC-68          55,625                  05/19/08     /  /      Morris Park Contracting             
                                                            HC-01         975,000                  05/19/08     /  /      David L. Kempton Inc.               
                                                            PC-01          16,448                  05/19/08     /  /      Davidson and Howard                 
                                                            SC-01               0                  12/09/02   01/07/03    Pinnacle Environ.                   
 
02-0309   New Construction             0-031-001  12/11/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CW-01           4,180                  06/16/05   07/12/05    Longo Associates                    
                                                            EC-01          19,630                  03/15/04   08/11/08    All Bright Electric                 
                                                            EC-02          56,780                  10/12/04   10/18/04    All Bright Electric                 
                                                            EC-03          22,147                  06/07/04   06/22/04    All Bright Electric                 
                                                            EC-04           3,512                  06/07/04   06/22/04    All Bright Electric                 
                                                            EC-05           6,696                  06/07/04   06/22/04    All Bright Electric                 
                                                            EC-06         122,910         122,910  06/17/04   09/27/04    All Bright Electric                 
                                                            EC-07          19,248                  06/16/04   09/27/04    All Bright Electric                 
                                                            EC-08          11,454                  09/29/04   12/24/04    All Bright Electric                 
                                                            EC-09          19,954                  12/06/04   12/23/04    All Bright Electric                 
                                                            EC-10           7,323                  09/29/04   12/24/04    All Bright Electric                 
                                                            EC-11          43,343                  09/29/04   12/24/04    All Bright Electric                 
                                                            EC-12          10,005                  09/29/04   12/24/04    All Bright Electric                 
                                                            EC-13          -5,391                  09/29/04   12/24/04    All Bright Electric                 
                                                            EC-14          19,555                  11/01/04   12/06/04    All Bright Electric                 
                                                            EC-15          14,297                  11/01/04   12/21/04    All Bright Electric                 
                                                            EC-16           8,212                  11/18/04   12/06/04    All Bright Electric                 
                                                            EC-17          18,772                  01/18/05   03/17/05    All Bright Electric                 
                                                            EC-18          18,184                  01/18/05   03/17/05    All Bright Electric                 
                                                            EC-19          16,830                  01/18/05   03/17/05    All Bright Electric                 
                                                            EC-20          17,597                  01/18/05   03/17/05    All Bright Electric                 
                                                            EC-21          14,735                  01/18/05   03/17/05    All Bright Electric                 
                                                            EC-22          17,468                  06/20/12   10/24/12    All Bright Electric                 
                                                            EC-23          16,860                  06/20/12   10/24/12    All Bright Electric                 
                                                            EC-24          16,596                  06/20/12   10/24/12    All Bright Electric                 
                                                            EC-25          67,810                  06/13/05   07/12/05    All Bright Electric                 
                                                            EC-26          17,159                  06/13/05   07/12/05    All Bright Electric                 
                                                            EC-27           2,433                  06/20/12   10/24/12    All Bright Electric                 
                                                            EC-28           9,500                  06/20/12   10/24/12    All Bright Electric                 
                                                            EC-29           5,890                  09/18/06   10/19/06    All Bright Electric                 
                                                            EC-30           4,000                  09/18/06   10/19/06    All Bright Electric                 
                                                            EQ-01           4,428                  01/18/05   03/18/05    Nickerson Corp                      
                                                            EQ-02           3,575                  10/24/05   11/08/05    Nickerson Corp                      
                                                            FS-01           3,100                  10/24/05   11/08/05    E Friedman Associates               
                                                            GC-01          16,566                  07/28/03   07/29/03    Morris Park Contracting             
                                                            GC-02          16,566                  07/28/03   07/29/03    Morris Park Contracting             
                                                            GC-03          16,566                  07/28/03   07/29/03    Morris Park Contracting             
                                                            GC-04          16,566                  07/28/03   07/29/03    Morris Park Contracting             
                                                            GC-05          17,603                  07/28/03   07/29/03    Morris Park Contracting             
                                                            GC-06          12,020                  10/23/03   11/18/03    Morris Park Contracting             
                                                            GC-07          16,283                  10/23/03   11/18/03    Morris Park Contracting             
                                                            GC-08          14,460                  10/23/03   11/18/03    Morris Park Contracting             
                                                            GC-09           4,062                  10/23/03   11/18/03    Morris Park Contracting             
                                                            GC-10          10,323                  10/10/03   11/26/03    Morris Park Contracting             
                                                            GC-11          12,032                  10/10/03   11/26/03    Morris Park Contracting             
                                                            GC-12          10,201                  10/10/03   11/26/03    Morris Park Contracting             
                                                            GC-13           6,771                  10/10/03   11/26/03    Morris Park Contracting             
                                                            GC-14          17,550                  10/20/03   11/17/03    Morris Park Contracting             
                                                            GC-15          19,643                  11/13/03   12/26/03    Morris Park Contracting             
                                                            GC-16          40,000                  11/13/03   12/26/03    Morris Park Contracting             
                                                            GC-17          10,809                  11/13/03   11/24/03    Morris Park Contracting             
                                                            GC-19          11,701                  12/17/03   12/26/03    Morris Park Contracting             
                                                            GC-20          19,620                  01/23/04   03/08/04    Morris Park Contracting             
                                                            GC-21           9,876                  03/15/04   04/07/04    Morris Park Contracting             
                                                            GC-22          13,333                  03/15/04   04/07/04    Morris Park Contracting             
                                                            GC-23          15,722                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-24          14,247                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-25           8,463                  06/07/04   06/14/04    Morris Park Contracting             
                                                            GC-26          23,926                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-27          13,825                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-28          11,591                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-29          30,100                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-30          12,730                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-31           8,080                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-32          14,830                  06/07/04   06/22/04    Morris Park Contracting             
                                                            GC-33          14,484                  06/17/04   06/22/04    Morris Park Contracting             
                                                            GC-34           2,633                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-35          12,429                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-36          18,259                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-37          15,366                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-38          19,795                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-39          19,590                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-40          18,449                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-41          11,740                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-42          19,132                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-43          10,285                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-44          -1,492                  09/29/04   12/24/04    Morris Park Contracting             
                                                            GC-45          16,109                  11/01/04   12/21/04    Morris Park Contracting             
                                                            GC-46          14,158                  11/01/04   12/21/04    Morris Park Contracting             
                                                            GC-47          13,462                  11/01/04   12/21/04    Morris Park Contracting             
                                                            GC-48          13,674                  11/01/04   12/06/04    Morris Park Contracting             
                                                            GC-49           9,471                  11/01/04   12/06/04    Morris Park Contracting             
                                                            GC-50          19,635                  11/10/04   12/06/04    Morris Park Contracting             
                                                            GC-51            -955                  11/10/04   12/06/04    Morris Park Contracting             
                                                            GC-52          16,025                  11/10/04   12/06/04    Morris Park Contracting             
                                                            GC-53           2,436                  11/10/04   12/06/04    Morris Park Contracting             
                                                            GC-54          11,567                  11/10/04   12/06/04    Morris Park Contracting             
                                                            GC-55          12,650                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-56           9,616                  01/24/05   03/18/05    Morris Park Contracting Corp        
                                                            GC-57          16,991                  01/24/05   03/18/05    Morris park Contracting             
                                                            GC-58          15,280                  01/24/05   03/18/05    Morris Park Contracting             
                                                            GC-59          19,604                  01/18/05     /  /      Morris Park Contracting Corp        
                                                            GC-59          19,604                  01/18/05   03/17/05    Morris Park Contracting             
                                                            GC-60          10,257                  01/24/05   03/18/05    Morris Park Contracting Corp        
                                                            GC-61           9,888                  01/24/05   03/18/05    Morris Park Contracting             
                                                            GC-62          33,558                  01/24/05   03/18/05    Morris Park Contracting Corp        
                                                            GC-63          13,597                  01/24/05   03/18/05    Morris Park Contracting             
                                                            GC-64          11,217                  01/24/05   03/18/05    Morris Park Contracting Corp        
                                                            GC-65          21,820                  01/24/05   03/18/05    Morris Park Contracting             
                                                            GC-66           7,136                  04/08/05   04/24/06    Morris Park Contracting             
                                                            GC-67          16,804                  04/08/05   10/24/12    Morris Park Contracting             
                                                            GC-68          55,625                  04/08/05   08/11/08    Morris Park Contracting             
                                                            GC-69          21,244                  04/08/05   04/24/06    Morris Park Contracting             
                                                            GC-70          17,179                  04/08/05   06/15/05    Morris Park Contracting             
                                                            GC-71          15,659                  04/08/05   06/15/05    Morris Park Contracting             
                                                            GC-72          10,221                  04/08/05   06/15/05    Morris Park Contracting             
                                                            GC-73           3,738                  04/08/05   06/15/05    Morris Park Contracting             
                                                            GC-74          49,140                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-75          12,382                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-76          14,052                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-77          18,690                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-78          16,002                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-79          13,379                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-80          15,979                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-81          19,727                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-82          18,052                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-83          15,029                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-84           8,145                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-85          16,211                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-86          14,957                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-87          11,674                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-88           1,987                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            HC-01         975,000                  10/10/03   08/11/08    David Kempton                       
                                                            HC-02          17,735                  10/24/05   10/26/05    David kempton Inc                   
                                                            HC-03          15,463                  10/24/05   11/01/05    david kempton                       
                                                            HC-04           2,218                  08/19/05   09/02/05    David kampton                       
                                                            HC-05           3,159                  03/31/06   07/24/06    David kempton                       
                                                            HC-06           2,307                  09/18/06   10/19/06    David Kempton                       
                                                            PC-01          16,448                  03/15/04   08/11/08    Davidson and Howard                 
                                                            PC-02           6,804                  04/07/04   06/22/04    Davidson and Howard                 
                                                            PC-03           4,575                  09/29/04   12/24/04    Davidson and Howard                 
                                                            PC-04          14,284                  11/10/04   12/06/04    Davidson and Howard                 
                                                            PC-05          19,858                  01/18/05   03/22/05    Davidson and Howard Inc             
                                                            PC-06           6,791                  04/08/05   06/21/05    Davidson and Howard Inc             
                                                            PC-07          -1,052                  10/24/05   10/26/05    Davidson and Howard                 
                                                            SC-02          13,500                  03/20/03   03/24/03    Pinnacle Environ.                   
                                                            SC-03           8,740                  03/20/03   03/24/03    Pinnacle Environ.                   
                                                            SC-04          12,760                  03/20/03   03/24/03    Pinnacle Environ.                   
                                                            SC-05           8,426                  08/12/03   08/14/03    Pinnacle Environ.                   
                                                            SC-06         -94,886                  06/07/04   06/22/04    Pinnacle Environ.                   
 
10-1366   Reconstruction               0-031-002  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1547   Reconstruction               0-031-003  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2093   Reconstruction               0-031-004  03/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2383   Reconstruction               0-031-005  12/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0346SC Visual Structural Inspection 0-031-SC1  11/15/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          8/9 Grade Ctr-Mechanical Bldg.(#28):
02-0310   Reconstruction               0-042-001  12/11/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            GC-18          11,324                  12/17/03   12/26/03    Morris Park Contracting             
                                                            GC-89           2,723                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-90          15,198                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-91          -4,950                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-92           9,690                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-93           9,873                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-94          14,091                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-95           2,017                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-96          -8,434                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-97        -117,264                  06/20/12   10/24/12    Morris Park Contracting Corp.       
                                                            GC-97        -117,264                  06/20/12     /  /      Morris Park Contracting Corp.       
 
03-1651   Reconstruction               0-042-002  01/26/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1525   Reconstruction               0-042-003  06/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          CAT Letchworth Bldg 29:
99-1202   Reconstruction               0-043-001  04/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          ````````````` Bldg 31:
99-0665   Reconstruction               0-045-001  04/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-1          -10,000                  01/17/02   03/26/02    Netrix                              
 

          CAT Letchworth Bldg 32:
99-0666   Reconstruction               0-046-001  04/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          CAT Letchworth Bldg 33:
99-0667   Reconstruction               0-047-001  04/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          CAT Letchworth Bldg 35:
99-0668   Reconstruction               0-049-001  04/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          CAT Letchworth Bldg 36:
99-0669   Reconstruction               0-050-001  04/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          CAT Letchworth Bldg 37:
99-0670   Reconstruction               0-051-001  04/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          CAT Letchworth Bldg 38:
99-0671   Reconstruction               0-052-001  04/10/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXHaverstraw Mid Annex Demo:
22-1936   Reconstruction               1-010-002  07/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Railroad Ave Admin. Bldg.:
96-0255   Reconstruction               1-013-004  09/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1140   Reconstruction               1-013-005  06/22/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Buckberg Warehouse:
10-1367   Reconstruction               2-015-002  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Garage:
96-1363   Reconstruction               3-002-003  05/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field House:
22-0910   Reconstruction               7-008-001  02/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPress Box Demo:
22-0911   Reconstruction               7-026-001  02/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pavilion @ NRHS:
21-0287   New Construction             7-073-001  11/24/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pavilion @ West Haverstraw Elem.:
21-0288   New Construction             7-074-001  11/24/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pavilion @ Thiells Elem.:
21-0289   New Construction             7-075-001  11/24/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pavilion @ Stony Point Elem.:
21-0290   New Construction             7-076-001  11/24/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box/Concession Stand (New):
22-0912   New Construction             7-079-001  02/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
99-1647   Reconstruction               7-999-003  06/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1            12,306                  01/28/03   02/03/03    Tenavision                          
                                                            G-2             5,918                  01/28/03   02/03/03    Tenavision                          
                                                            G-3             7,526                  01/28/03   02/03/03    Tenavision                          
                                                            G-4            61,205                  02/06/02   05/05/03    Tenavision                          
                                                            G-5            19,409                  02/06/02   03/21/02    Tenavision                          
                                                            G-6            19,562                  12/23/02   01/14/03    Tenavision                          
                                                            G-7            11,135                  12/23/02   01/14/03    Tenavision                          
 
15-1933   Reconstruction               7-999-004  10/05/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0069   Reconstruction               7-999-005  04/26/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0120   Reconstruction               7-999-006  09/18/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Willow Grove MS (purch-see 0-030):
96-1023   Reconstruction               8-030-002  04/16/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01         -15,320                  10/24/05   11/25/05    David kempton                       
 
97-0502   Additions and Alterations    8-030-003  12/18/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0124   Reconstruction               8-030-005  09/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0496   Reconstruction               8-030-006  03/12/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1541   Reconstruction               8-030-008  07/16/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              9,504                  02/16/05   02/18/05    Nikko Construction Corp             
                                                            02             11,695                  02/16/05   02/18/05    Nikko Construction                  
                                                            03              4,604                  02/16/05   02/18/05    Nikko Construction                  
                                                            04             13,981                  02/16/05   02/18/05    Nikko Construction                  
 
03-1563   Reconstruction               8-030-009  07/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1769   Reconstruction               8-030-010  07/29/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1368   Reconstruction               8-030-011  03/15/12  NO CHANGE ORDERS ON ELECTRONIC FILE

SOUTH ORANGETOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Tappan Zee High School:
90-1294   Reconstruction               0-006-009  05/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0521   Additions and Alterations    0-006-010  03/11/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            7               4,802                  03/15/00   12/01/03    Rockland Elec.                      
 
97-0228   Reconstruction               0-006-011  02/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0775   Reconstruction               0-006-012  01/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1431   Reconstruction               0-006-014  08/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1478   Additions and Alterations    0-006-015  06/28/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1C-SC133       -9,000                  10/05/07   11/08/07    LANDTEK                             
                                                            1C-SC134        5,000                  10/05/07   11/08/07    LANDTEK                             
                                                            1C-SC135       -6,000                  10/05/07   11/08/07    LANDTEK                             
                                                            1C-SC136        1,000                  10/05/07   12/11/12    LANDTEK                             
                                                            1CSC102             0                  10/19/09   12/26/12    LandTek                             
                                                            1CSC119        -5,000                  10/19/09   12/26/12    LandTek                             
                                                            1CSC124       -50,000                  10/19/12   12/11/12    LandTek                             
                                                            EC-201              0                  08/04/06   08/31/06    Perreca Electric                    
                                                            EC-207          1,645                  11/07/06   01/30/07    Perreca electric                    
                                                            EC-208            886                  11/07/06   01/30/07    Perreca Electric                    
                                                            EC-210         -1,719                  11/07/06   01/30/07    Perreca Electric                    
                                                            EC202           2,201                  08/04/06   08/31/06    Perreca Elecgtric                   
                                                            EC203           3,550                  08/25/06   10/12/06    Perreca Electric                    
                                                            EC205               0                  08/25/06   10/12/06    Perreca Electric                    
                                                            EC206          15,214                  08/25/06   10/12/06    Perreca Electric                    
                                                            SC-110              0                  08/25/06   10/13/06    Landtek                             
                                                            SC-115              0                  08/25/06   10/13/06    Landtek                             
                                                            SC-122              0                  07/05/07   07/17/07    Landtek                             
                                                            SC-123         13,175                  07/05/07   07/17/07    Landtek                             
                                                            SC-125          7,000                  07/05/06   07/17/07    Landtek                             
                                                            SC-126         -4,400                  07/05/07   07/17/07    Landtek                             
                                                            SC-128              0                  07/05/07   07/17/07    Landtek                             
                                                            SC-129          4,000                  07/05/07   07/17/07    Landtek                             
                                                            SC-130            700                  07/05/07     /  /      Landtek                             
                                                            SC-131          5,900                  07/05/07   07/17/07    Landtek                             
                                                            SC132           1,720                  07/05/07   07/17/07    Landtek                             
                                                            Sc127           7,265                  07/05/07   07/17/07    Landtek                             
 
05-0523   Reconstruction               0-006-016  02/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2 EC220             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2 PC402             0                  03/06/07   03/13/07    Pearl River Plumbing                
                                                            2-EC 235        5,234                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC 236          651                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC 237          835                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC 241        1,900                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC 242        7,900                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC 243        6,292                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC-244        3,414                  03/17/08   08/06/08    FANSHAWE, INC.                      
                                                            2-GC-157       85,298                  10/05/07   11/08/07    FOURMAN CONSTRUCTION INC.           
                                                            2-GC-158       55,030                  10/05/07   11/08/07    FOURMAN CONSTRUCTION INC.           
                                                            2-GC-159        2,006                  10/05/07   11/08/07    FOURMAN CONSTRUCTION INC.           
                                                            2-GC-162        6,208                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-GC-163        3,689                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-GC-164       23,024                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-GC-168       15,000                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-GC-169       -2,023                  03/17/08   03/31/08    FOURMEN CONSTRUCTION INC.           
                                                            2-GC-170       -1,600                  03/17/08   03/31/08    FOURMEN CONSTRUCTION INC.           
                                                            2-GC-171       -4,793                  03/17/08   03/31/08    FOURMEN CONSTRUCTION INC.           
                                                            2-MC-315       -2,980                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-MC-316        1,532                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-MC-317            0                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-MC-318        2,198                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-MC-320         -436                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-MC-322        3,085                  02/28/08   04/15/08    PEARL RIVER PLUMBING & HEATING      
                                                            2-MC-324        2,401                  03/17/08   08/06/08    PEARL RIVER PLUMBING, HEATING & E   
                                                            2-PC-406            0                  10/05/07     /  /      PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-408       41,224                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-409            0                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-410            0                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-411            0                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-414        1,926                  06/02/08   09/29/08    Pearl River Plumbing                
                                                            2-PC-415            0                  06/02/08   02/12/09    Pearl River Plumbing Heating & Elec 
                                                            2EC 204             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 205             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 206             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 207             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 208             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 209             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 210             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 211       -12,481                  03/06/07   04/03/07    Fanshwe Inc                         
                                                            2EC 212             0                  03/06/07   04/03/07    Fanshwe Inc                         
                                                            2EC 213             0                  03/06/07   04/03/07    Fanshwe Inc                         
                                                            2EC 214             0                  04/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 215             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 216             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 217             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC 218             0                  04/06/07   04/04/07    Fanshawe Inc                        
                                                            2EC 219             0                  03/06/07   04/04/07    Fanshawe Inc                        
                                                            2EC 221             0                  03/06/07   04/03/07    Fanshawe Inc                        
                                                            2EC-222             0                  05/01/07   05/15/07    Fanshawe Inc                        
                                                            2EC-223             0                  05/01/07   05/15/07    Fanshawe Inc                        
                                                            2EC-224             0                  05/01/07   05/15/07    Fanshawe Inc                        
                                                            2EC-226         3,600                  06/15/07   06/20/07    Fanshawe Inc                        
                                                            2EC-227        -4,565                  06/15/07   06/20/07    Fanshawe Inc                        
                                                            2EC-228         7,471                  06/15/07   06/20/07    Fanshawe Inc                        
                                                            2EC-229        85,825                  06/15/07   06/20/07    Fanshawe Inc                        
                                                            2EC-230       -17,603                  06/15/07   06/20/07    Fanshawe Inc                        
                                                            2EC-231             0                  06/15/07   06/20/07    Fanshawe Inc                        
                                                            2EC-232         2,823                  06/15/07   06/20/07    Fanshawe Inc                        
                                                            2GC-105        15,453                  11/07/06   12/28/06    Fourmen Construction                
                                                            2GC-106         6,171                  11/07/06   12/28/06    Fourmen Construction                
                                                            2GC-107          -111                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-108             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-109             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-110             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-111       -13,149                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-112             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-113             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-114             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-115             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-116             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-117       -47,593                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-119        -2,473                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-121        12,034                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-122        -3,319                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-123             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-125             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-126             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-127             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-128             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-129       -16,656                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-131         4,152                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-132             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-133             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-134             0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-140         1,864                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-141         1,425                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-142         2,349                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-143         6,991                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-145         2,631                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-148        34,536                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-149        21,379                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-151         5,482                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-152         3,500                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-153         2,429                  05/29/07   06/20/07    Fourmen Construction                
                                                            2GC-154        -5,000                  06/15/07   06/20/07    Fourmen Construction                
                                                            2GC-155        -9,900                  06/15/07   06/20/07    Fourmen Construction                
                                                            2GC-156        14,363                  03/15/07   06/20/07    Fourmen Construction                
                                                            2GC124              0                  05/29/07   06/20/07    Fourmen Construction                
                                                            2Gc-144         6,139                  05/29/07   06/20/07    Fourmen Construction                
                                                            2MC 305             0                  03/06/07   03/13/07    Pearl River Plumbing                
                                                            2MC 311             0                  05/01/07   07/27/07    Pearl River Plumbing                
                                                            2MC 312             0                  05/01/07   07/27/07    Pearl River Plumbing                
                                                            2MC306              0                  03/06/07   03/13/07    Pearl River Plumbing                
                                                            2MC307              0                  03/06/07   03/13/07    Pearl River Plumbing                
                                                            2MC308              0                  04/06/07   03/13/07    Pearl River Plumbing                
                                                            2MC313              0                  05/01/07   07/27/07    Pearl River Plumbing                
                                                            2PC 401             0                  03/06/07   03/13/07    Pearl River Plumbing                
                                                            2PC 403             0                  03/06/07   03/13/07    Pearl River Plumbing                
                                                            2PC 404             0                  03/06/07   03/13/07    Pearl River Plumbing                
 
07-0580   Reconstruction               0-006-017  10/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC X-001        8,139                  03/17/08   03/31/08    TRITION CONSTRUCTION COMPANY        
                                                            GC X-002        2,515                  03/17/08   03/31/08    TRITION CONSTRUCTION COMPANY        
 
08-0140   Reconstruction               0-006-018  08/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0141   Reconstruction               0-006-019  11/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1446   Reconstruction               0-006-020  06/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,630                  08/25/11   09/14/11    AMB CONSTRUCTION                    
                                                            001-HS        -13,475                  07/08/11   09/15/11    AMB CONSTRUCTION INC                
                                                            002             3,000                  08/25/11   09/14/11    AMB CONSTRUCTION INC                
                                                            003            15,180                  08/25/11   09/14/11    AMB CONSTRUCTION INC                
                                                            004             1,000                  10/13/11   12/08/11    AMB CONSTRUCTION INC                
                                                            005             7,600                  10/13/11   12/08/11    AMB CONSTRUCTION INC                
                                                            006             3,500                  10/13/11   12/08/11    AMB CONSTRUCTION INC                
                                                            007             4,920                  01/20/12   04/17/12    AMB CONSTRUCTION INC                
                                                            008             7,894                  04/20/12   08/31/12    AMB CONSTRUCTION INC                
 
12-0820   Reconstruction               0-006-022  10/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               6,447                  09/22/14   09/29/14    Empire Energy Specialist, Inc.      
 
13-0676   Reconstruction               0-006-023  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            2               7,107                  01/06/16   01/22/16    Hertz Furniture                     
 
14-0266   Reconstruction               0-006-024  04/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,000                  09/14/15   09/14/15    HVS LLC Electrical & Const. Services
                                                            1               9,616                  01/06/16   01/21/16    Hudson Valley Bridge Construction   
                                                            2              11,449                  01/06/16   01/22/16    HVC, LCC Electrical & Const.        
                                                            2               2,286                  01/06/16   01/21/16    Hudson Valley Bridge Construction   
                                                            3               6,401                  01/06/16   01/21/16    HVS, LLC Electrical & Const.        
                                                            4               4,602                  02/02/16   02/08/16    HVS,LLC ELECTRICAL & CONST. SERVICES
                                                            5               8,350                  02/02/16   02/08/16    HVS,LLC ELECTRICAL & CONST. SERVICES
 
16-1551   Reconstruction               0-006-026  12/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-01      -29,900                  07/08/19   07/10/19    FANSHAWE, INC.                      
                                                            CO-GC-01     -102,150                  07/08/19   07/15/19    NORTHEASTERN INTERIOR SERVICES LLC  
                                                            CO-MC-01      -48,050                  07/08/19   07/10/19    DJ HEATING & AIR CONDITIONING, INC. 
 
18-0689   Reconstruction               0-006-027  03/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01           6,500                  05/08/20   07/02/20    BERTUSSI CONTRACTING, INC.          
 
18-0940   Reconstruction               0-006-028  05/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01         -16,059                  01/19/21   03/18/21    DANT CLAYTON                        
                                                            CO-02           3,550                  04/13/21   05/18/21    DANT CLAYTON                        
                                                            EC-01          16,059                  12/14/20   02/22/21    HVS, LLC                            
                                                            EC-02           4,179                  04/13/21   07/15/21    HVS, LLC                            
                                                            GC-02          14,829                  04/13/21   05/18/21    GRACE CONTRACTING & DEVELOPMENT, LLC
                                                            GC-03           5,876                  04/13/21   05/18/21    GRACE CONTRACTING & DEVELOPMENT, LLC
                                                            MC-01          23,338                  08/21/20   10/29/20    JOE LOMBARDO PLUMBING & HEATING OF R
                                                            MC-02          38,227                  12/14/20   02/22/21    JOE LOMBARDO PLUMBING & HEATING OF R
                                                            PC-01          -4,015                  02/08/21   03/31/21    INTEGRITY MECHANICAL, INC.          
 
20-1663   Reconstruction               0-006-029  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           6,117                  09/30/22   07/18/23    Fanshawe Inc dBa Rockland Elec      
                                                            EC-02             553                  09/15/23     /  /      FANSHAWE INC. dBa ROCKLAND ELEC     
                                                            EC-03           4,017                  09/15/23     /  /      FANSHAWE INC. dBa ROCKLAND ELEC     
                                                            EC-04           1,879                  09/15/23     /  /      FANSHAWE INC dBa ROCKLAND ELECTRIC  
 
21-0006FC Reconstruction               0-006-030  12/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -20,000                  12/21/22   12/01/23    Mehl Elec Company Inc               
                                                            EC-02          -4,463                  12/21/22   12/01/23    Fanshawe Inc dba Rockland Elec      
                                                            GC-01         -55,500                  06/26/23   12/22/23    PETER A. CAMILLI                    
                                                            MC-01          -2,355                  12/21/22   12/01/23    Bertussi Contr Inc                  
 
21-1936   Reconstruction               0-006-031  09/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -5,630                  06/26/23   12/22/23    ZN CONST.                           
                                                            GC-02          -5,200                  06/26/23   12/22/23    ZN CONST.                           
                                                            GC-03          23,216                  09/15/23     /  /      ZN CONSTRUCTION LLC                 
 
22-1476   Reconstruction               0-006-032  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2170FP Reconstruction               0-006-FP1  09/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tappan Zee Elementary:
93-0802   Reconstruction               0-007-008  03/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0115   Additions and Alterations    0-007-009  10/30/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              16,100                  11/19/99   01/16/03    Environcon LLC                      
 
97-0229   Reconstruction               0-007-010  02/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1432   Reconstruction               0-007-011  08/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0524   Additions and Alterations    0-007-012  02/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-GC-130       -3,300                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-150        1,357                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-166       24,745                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-MC-310       14,804                  05/01/07   07/27/07    Pearl River Plumbing, Heating& Ele. 
                                                            2-MC-314            0                  10/05/07     /  /      PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-416       14,725                  02/12/09   05/18/09    PEARL RIVER PLUMBING, HEATING & ELEC
 
09-0142   Reconstruction               0-007-014  11/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0808   Reconstruction               0-007-016  04/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -14,071                  04/20/12   10/19/12    WB CONTRACTING CORP                 
 
13-0677   Reconstruction               0-007-017  06/06/14  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0690   Reconstruction               0-007-018  03/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -2,382                  04/30/20   07/02/20    FANSHAWE, INC.                      
                                                            GC-02         -71,047                  09/13/19   09/18/19    BERTUSSI CONTRACTING, INC.          
                                                            GC-05         -45,000                  05/08/20   07/13/20    BERTUSSI CONTRACTING, INC.          
                                                            GC-06          -5,691                  05/08/20   07/13/20    BERTUSSI CONTRACTING, INC.          
 
02-2166FP Reconstruction               0-007-FP1  09/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Palisades Elementary:
10-0809   Reconstruction               0-008-010  04/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002           -16,113                  04/20/12   10/19/12    WB CONTRACTING CORP                 
 
16-0678   Reconstruction               0-008-011  11/23/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cottage Lane Elementary:
98-0116   Additions and Alterations    0-010-008  10/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0230   Reconstruction               0-010-009  02/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1433   Reconstruction               0-010-010  08/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0525   Additions and Alterations    0-010-011  02/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-EC 240        7,875                  02/28/08     /  /      FANSHAWE                            
                                                            2-EC-233       -5,673                  06/15/07   06/20/07    Fanshawe, Inc.                      
                                                            2-EC-234        2,151                  06/15/07   06/20/07    Fanshawe, Inc.                      
                                                            2-EC-245          707                  03/17/08   08/06/08    FANSHAWE, INC.                      
                                                            2-EC-246        1,000                  03/17/08   08/06/08    FANSHAWE, INC.                      
                                                            2-EC-247        1,867                  03/17/08   08/06/08    FANSHAWE, INC.                      
                                                            2-EC-248       -2,500                  03/17/08   08/06/08    FANSHAWE, INC.                      
                                                            2-GC-135       52,500                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-136       12,619                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-137       19,274                  05/29/07   07/30/09    Fourmen Construction Inc.           
                                                            2-GC-138       12,680                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-139       23,419                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-146        3,837                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-147       10,149                  05/29/07   06/20/07    Fourmen Construction Inc.           
                                                            2-GC-161       16,943                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-GC-165       -4,824                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-GC-167       27,984                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-MC 321       34,877                  02/28/08   06/21/19    PEARL RIVER PLUMBING & HEATING      
                                                            2-MC 323       45,888                  02/28/08   06/19/19    PEARL RIVER PLUMBING & HEATING      
                                                            2-MC-319        3,735                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-MC-325       -2,988                  03/17/08   08/06/08    PEARL RIVER PLUMBING, HEATING & E   
                                                            2-MC-326        1,392                  03/17/08   08/06/08    PEARL RIVER PLUMBING, HEATING & E   
                                                            2-PC-405          571                  10/05/07   11/09/07    Pearl River Plumbing,Heating &ELE   
                                                            2-PC-407            0                  10/05/07   10/18/13    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-412            0                  10/05/07   01/23/08    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            2-PC-413        2,312                  06/02/08   09/29/08    Pearl River Plumbing                
 
04-1075   Reconstruction               0-010-013  04/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101A-080         -579                  08/04/06   08/31/06    S and M Management                  
                                                            102A           -1,082                  08/04/06   08/31/06    S and M Management                  
                                                            103a            1,253                  08/04/06   08/31/06    S and M Management                  
                                                            104                 0                  08/04/06   08/31/06    S and M Managment                   
                                                            106A                0                  08/04/06   08/31/06    S and M managment                   
 
09-0143   Reconstruction               0-010-015  11/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0810   Reconstruction               0-010-016  04/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -6,968                  04/20/12   10/19/12    BBR CONTRACTING CORP                
 
13-0678   Additions and Alterations    0-010-017  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,200                  01/06/16   01/22/16    Milburn Flooring Mills              
                                                            1             -11,360                  07/12/17   07/14/17    Unitech Service Group               
                                                            1                -509                  07/12/17   07/14/17    Hausler Bros., Inc.                 
                                                            3              16,278                  01/06/16   01/22/16    PVS Construction                    
 
18-0691   Reconstruction               0-010-018  03/12/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0941   Reconstruction               0-010-019  05/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-03           2,117                  12/14/20   02/22/21    JOE LOMBARDO PLUMBING & HEATING OF R
 
20-1305   Reconstruction               0-010-020  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1937   Reconstruction               0-010-021  09/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1477   Reconstruction               0-010-022  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1478   Reconstruction               0-010-023  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2168FP Reconstruction               0-010-FP1  09/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Greenbush Academy:
09-0144   Reconstruction               0-011-007  11/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0811   Reconstruction               0-011-008  04/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -1,057                  04/20/12   10/19/12    WB CONTRACTING CORP                 
 
13-0679   Reconstruction               0-011-009  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,377                  09/14/15   09/14/15    Moy Construction Corp               
                                                            2               2,667                  09/14/15   09/14/15    Moy Construction Corp               
 

          William Schaefer Elementary:
98-0118   Additions and Alterations    0-012-005  10/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0231   Reconstruction               0-012-006  02/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1430   Reconstruction               0-012-007  08/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0526   Additions and Alterations    0-012-008  02/23/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-EC 238        2,176                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC 239        2,840                  02/28/08   04/15/08    FANSHAWE                            
                                                            2-EC-225         -360                  05/01/07   05/15/07    Fanshawe, Inc.                      
                                                            2-GC-120      -12,034                  05/29/07   06/20/07    Fourmen Construction, Inc.          
                                                            2-GC-160      -29,519                  02/28/08   04/14/08    FOURMEN CONSTRUCTION                
                                                            2-MC-309      -16,391                  05/01/07   07/27/07    Pearl River Plumbing,Heating Ele.   
 
04-1076   Reconstruction               0-012-010  04/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            102B           -1,083                  08/04/06   08/31/06    S and M Management                  
                                                            103B            1,253                  08/04/06   08/31/06    S and M Management                  
                                                            106B                0                  08/04/06   08/31/06    S and M Management                  
                                                            108             6,475                  08/04/06   08/31/06    S and M Managment                   
                                                            1afo109             0                  08/04/06   09/06/06    S&M Management Inc.                 
                                                            q01B             -579                  08/04/06   08/31/06    S and M Management                  
 
09-0145   Reconstruction               0-012-011  11/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0812   Reconstruction               0-012-012  04/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,250                  08/25/11   09/07/11    AMB CONSTRUCTION                    
                                                            002            10,000                  08/25/11   09/07/11    AMB CONSTRUCTION INC                
                                                            003            -3,241                  04/30/12   10/19/12    AMB Construction, Inc               
 
12-0822   Reconstruction               0-012-013  10/08/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0680   Reconstruction               0-012-014  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              11,001                  01/06/16   01/22/16    PVS Construction                    
 
16-1550   Reconstruction               0-012-015  12/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02            -937                  09/13/19   09/16/19    FANSHAWE, INC.                      
                                                            EC-03          12,518                  03/13/20   06/29/20    FANSHAWE                            
 
18-0692   Reconstruction               0-012-016  03/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -12,000                  09/13/19   09/18/19    BERTUSSI CONTRACTING, INC.          
                                                            GC-03         -14,000                  09/13/19   09/18/19    BERTUSSI CONTRACTING, INC.          
                                                            PC-01         -15,000                  02/06/20   03/06/20    BERTUSSI CONTRACTING, INC.          
 
20-1306   Reconstruction               0-012-017  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02         -19,500                  06/26/23   12/22/23    PETER A. CAMILLI & SONS             
                                                            PC-01          -6,876                  12/21/22   12/01/23    S&L Plumb&Heat Corp                 
 
22-1479   Reconstruction               0-012-019  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1480   Reconstruction               0-012-020  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2169FP Reconstruction               0-012-FP1  09/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
98-0520   Additions and Alterations    0-013-010  03/11/99  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0232   Reconstruction               0-013-011  02/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1434   Reconstruction               0-013-012  08/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0860   Reconstruction               0-013-013  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1160   Reconstruction               0-013-014  05/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1BPC-401            0                  10/05/07     /  /      PEARL RIVER PLUMBING, HEATING & ELEC
                                                            1BPC-402            0                  10/05/07   10/23/07    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            1BPC-403            0                  10/05/07   10/23/07    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            1BPC-404         -649                  10/05/07   10/23/07    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            EC 221          2,649                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            EC 222            479                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            EC 223            463                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            EC 224            691                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            EC 225            432                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            EC 226          3,817                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            EC-208              0                  08/04/06   08/25/06    Fansshawe                           
                                                            EC-217          1,237                  08/25/06   10/13/06    Fanshawe, inc.                      
                                                            EC202           5,137                  08/04/06   08/25/06    Fanshawe                            
                                                            EC203         -19,948                  08/04/06   08/25/06    Fanshawe                            
                                                            EC206               0                  08/04/06   08/25/06    Fanshawe                            
                                                            EC207               0                  08/04/06   08/25/06    Fanshawe                            
                                                            EC209               0               3  08/25/06   10/13/06    Fanshawe                            
                                                            EC210           7,792                  08/25/06   10/13/06    Fanshawe                            
                                                            EC213               0                  08/25/06     /  /      Fanshawe                            
                                                            EC216               0                  08/25/06   10/13/06    Fanshawe                            
                                                            EC218           1,639                  08/25/06   10/13/06    Fanshawe                            
                                                            EC219           9,821                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            EC220           3,069                  03/06/07   03/23/07    Fanshawe Inc                        
                                                            GC-113         18,687                  08/04/06   08/25/06    Fourmen Construction                
                                                            GC-115          3,994                  08/04/06   08/25/06    Fourmen Construction                
                                                            GC-116          4,165                  08/04/06   08/25/06    Fourmen Construction                
                                                            GC-117              0                  08/04/06   08/25/06    Fourmen Construction                
                                                            GC-122              0                  08/04/06   08/25/06    Fourmen Construction                
                                                            GC114               0                  08/04/06   08/25/06    Fourmen Construction                
                                                            GC118               0                  08/25/06   10/13/06    Fourmen Construction                
                                                            GC121           9,044                  08/25/06   10/13/06    Fourmen Construction                
                                                            GC123               0                  08/25/06   10/13/06    Fourmen Construction                
                                                            GC124               0                  08/25/06   10/13/06    Fourmen Construction                
                                                            GC125           9,911                  08/25/06   10/13/06    Fourmen Construction                
                                                            GC128           1,877                  12/27/06   01/23/07    fourmen Construction                
                                                            GC129           1,568                  12/27/06   01/23/07    Fourmen Construction                
                                                            MC-307         -2,000                  05/11/07   05/14/07    David Kempton                       
                                                            MC301         -10,749                  05/11/07   05/14/07    David Kempton Inc                   
                                                            MC302         -10,000                  05/11/07   05/14/07    David Kempton                       
                                                            MC303           3,000                  05/11/07   05/14/07    David Kempton                       
                                                            MC306          -5,000                  05/11/07   05/14/07    David Kempton                       
 
04-1096   Reconstruction               0-013-017  04/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101C-080         -579                  08/04/06   12/18/06    S and M Management                  
                                                            102C           -1,082                  08/04/06   12/18/06    S and M Management                  
                                                            103C            1,253                  08/04/06   12/18/06    S and M Managment                   
                                                            105                 0                  08/04/06   12/18/06    S and M Management                  
                                                            106C                0                  08/04/06   12/18/06    S and M management                  
 
07-1076   Additions and Alterations    0-013-018  07/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,605                  11/26/08   02/10/09    HVS ELECTRIC, LLC                   
                                                            001            29,500                  11/26/08   01/30/12    THOMAS J. KEMPTON JR. INC.          
                                                            001             2,000                  11/26/08   02/16/09    MARQUISE CONSTRUCTION CORP          
                                                            001                 0                  02/17/09   08/19/09    PEARL RIVER PLUMBING & HEATING      
                                                            001            35,684                  07/14/09   05/10/10    Pearl river plumbing                
                                                            002             2,500                  11/26/08   01/30/12    HVS ELECTRIC, LLC                   
                                                            002             1,165                  01/07/09   02/26/09    THOMAS J. KEMPTON JR. INC.          
                                                            002             1,624                  01/07/09   04/10/09    MARQUISE CONSTRUCTION CORP.         
                                                            002            -6,000                  04/02/09   07/28/09    Pearl River Plumbing & Heating      
                                                            003             3,484                  02/17/09   04/10/09    MARQUISE CONSTRUCTION CORP.         
                                                            003            46,500                  02/17/09   04/10/09    THOMAS J. KEMPTON JR., INC.         
                                                            003            17,750                  02/17/09   04/10/09    HVS ELECTRIC, LLC                   
                                                            003             8,695                  06/01/09   08/14/09    PEARL RIVER PLUMBING & HEATING      
                                                            004                 0                  02/17/09   04/10/09    MARQUISE CONSTRUCTION CORP.         
                                                            004            -1,165                  02/17/09   04/23/09    THOMAS J. KEMPTON JR., INC.         
                                                            004               811                  02/17/09   04/10/09    HVS ELECTRIC, LLC                   
                                                            004             3,595                  07/17/09   01/30/12    PEARL RIVER d/b/a BERTUSSI'S        
                                                            005            22,000                  04/09/09   04/10/09    Marquise Construction Corp          
                                                            005            22,000                  04/02/09     /  /      MARQUISE CONSTRUCTION CORP.         
                                                            005           -10,501                  06/01/09   08/14/09    THOMAS J KEMPTON JR INC             
                                                            005                 0                  06/01/09   08/14/09    HVS ELECTRIC LLC                    
                                                            006                 0                  06/01/09   08/14/09    THOMAS J KEMPTON JR INC             
                                                            006            -5,000                  06/01/09   08/14/09    HVS ELECTRIC LLC                    
                                                            006             1,165                  06/01/09   08/18/09    MARQUISE CONSTRUCTION CORP          
                                                            007           -20,000                  06/01/09   08/18/09    MARQUISE CONSTRUCTION CORP          
                                                            007            -2,045                  08/09/10   11/30/10    THOMAS J KEMPTON JR INC             
                                                            008             6,674                  06/01/09   08/18/09    MARQUISE CONSTRUCTION CORP          
                                                            009             2,740                  06/01/09   08/18/09    MARQUISE CONSTRUCTION CORP          
                                                            010             2,957                  06/01/09   08/18/09    MARQUISE CONSTRUCTION CORP          
                                                            011            24,900                  06/01/09   08/18/09    MARQUISE CONSTRUCTION CORP          
                                                            012            -1,500                  07/17/09   08/19/09    MARQUISE CONSTRUCTION CORP          
                                                            013           -25,000                  06/11/12   12/26/12    MARQUISE CONSTRUCTION CORP          
 
09-0146   Reconstruction               0-013-019  11/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1447   Reconstruction               0-013-020  06/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-MS        -13,975                  07/08/11   09/15/11    AMB CONSTRUCTION INC                
 
12-0821   Reconstruction               0-013-022  10/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1                -600                  09/22/14   09/29/14    Empire Energy Specialist, Inc.      
                                                            1               5,525                  10/23/14   10/24/14    Northeastern Interior Services      
                                                            1             -14,000                  10/23/14   10/24/14    Hertz Furniture                     
                                                            2                 154                  09/22/14   09/29/14    Empire Energy Specialist, Inc.      
                                                            4              -3,302                  09/22/14   09/29/14    Empire Energy Specialist, Inc.      
                                                            5                 705                  09/22/14   09/29/14    Empire Energy Specialist, Inc.      
                                                            6                 524                  09/22/14   09/29/14    Empire Energy Specialist, Inc.      
                                                            7                -706                  09/22/14   09/29/14    Empire Energy Specialist, Inc.      
                                                            8                 767                  10/23/14   10/24/14    Empire Energy Specialist, Inc.      
 
13-0681   Reconstruction               0-013-023  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,147                  10/19/15   01/28/16    Hertz Furniture                     
                                                            1              11,001                  01/06/16   01/22/16    PVS Construction                    
                                                            1               9,514                  01/06/16   01/22/16    Hauser Bros. Inc.                   
                                                            2               1,876                  01/06/16   01/22/16    Hauser Brothers, Inc.               
                                                            3               9,200                  01/06/16   01/22/16    Hauser Brothers, Inc.               
                                                            4              -5,500                  01/06/16   01/22/16    Hauser Brothers, Inc.               
 
16-1552   Reconstruction               0-013-024  12/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-GC-02       -3,025                  07/08/19   07/15/19    NORTHEASTERN INTERIOR SERVICES LLC  
                                                            EC-04           5,432                  05/08/20   07/02/20    FANSHAWE, INC.                      
                                                            GC-03-R1        2,041                  02/06/20   03/13/20    NORTHEASTERN INTERIOR SERVICES LLC  
                                                            GC-04         -23,982                  04/30/20   07/14/20    NORTHEASTERN INTERIOR SERVICES, LLC 
                                                            PC-01          -4,568                  12/16/19   12/26/19    JOE LOMBARDO PLUMBING & HEATING OF R
 
18-0942   Reconstruction               0-013-026  05/21/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           4,188                  04/13/21   07/15/21    HVS, LLC                            
                                                            GC-01          -2,939                  04/13/21   06/23/21    GRACE CONTRACTING & DEVELOPMENT, LLC
                                                            GC-04          -5,500                  12/16/19   12/27/19    BERTUSSI CONTRACTING, INC.          
                                                            GC-07          -9,029                  05/08/20   07/13/20    BERTUSSI CONTRACTING, INC.          
 
20-1664   Reconstruction               0-013-027  07/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1938   Reconstruction               0-013-028  09/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2167FP Reconstruction               0-013-FP1  09/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPress Box (demo'd 2018):
18-0943   Reconstruction               7-003-001  05/21/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field House:
04-1479   New Construction             7-019-001  06/28/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-GC-101         -438                  11/07/06   01/09/07    Fourmen Construction Inc.           
 

          Press Box:
18-0944   New Construction             7-024-001  05/21/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Schaefer Elem Outdoor Classrm:
22-2478   New Construction             7-053-001  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cottage Lane Elem Outdoor Classrm:
22-2479   New Construction             7-054-001  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tappan Zee HS Outdoor Classrm:
22-2480   New Construction             7-055-001  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          MS Outdoor Classrm:
22-2481   New Construction             7-056-001  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Districtwide:
12-1235   Reconstruction               7-999-002  06/19/13  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0872   Reconstruction               7-999-004  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cottage Lane Library:
17-0371   New Construction             8-023-001  08/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          12,394                  09/13/19   09/24/19    BUTLER CONSTRUCTION GROUP           
                                                            GC-02           3,487                  01/19/21   04/21/21    BULER CONSTRUCTION GROUP            
 
22-1482   Reconstruction               8-023-002  08/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

NYACK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-04-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Valley Cottage Elementary:
01-0811   Reconstruction               0-001-004  03/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              1,950                  09/04/02   10/21/02    Universal Construction              
 
03-1502   Reconstruction               0-001-005  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0800   Reconstruction               0-001-007  12/10/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1718   Reconstruction               0-001-008  06/22/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004            17,151                  10/27/16   12/12/16    Joseph Lombardo Plumbing, Heating & 
                                                            01              4,180                  03/12/10   06/01/10    BEST ROOFING OF NEW JERSEY INC      
 
09-1358   Reconstruction               0-001-009  07/16/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           291,000                  03/28/12   03/28/12    Arrow Steel Window Corp             
                                                            002            78,700                  07/27/12   04/22/13    ARROW STEEL WINDOW CORP             
 
13-1199   Reconstruction               0-001-010  04/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               9,500                  09/15/14   09/18/14    NSC Abatement Services Inc.         
                                                            3              37,500                  09/15/14   09/18/14    NSC Abatement Services Inc.         
 
13-1684   Reconstruction               0-001-011  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,430                  12/28/15   04/19/16    HVS LLC                             
                                                            1              -1,725                  12/28/15   04/19/16    JOSEPH LOMBARDO PLUMBING & HEATING  
                                                            2                 713                  12/28/15   04/19/16    HVS LLC                             
                                                            3                 830                  12/28/15   04/19/16    HVS LLC                             
                                                            4                 895                  12/28/15   04/19/16    HVS LLC                             
 
18-1607   Reconstruction               0-001-012  05/13/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006               918                  08/27/21   05/11/22    LYCHINIDOS LLC                      
 
20-0981   Reconstruction               0-001-013  03/31/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          4,620                  10/04/21   12/02/22    Key Construction Services, LLC      
                                                            GC-002          4,548                  12/27/21   11/01/22    Key Const Servs LLC                 
                                                            GC-003          7,800                  08/22/22   12/14/23    Key Const Servs LLC                 
 
19-1703   Reconstruction               0-001-014  06/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0031   Reconstruction               0-001-015  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0182FA Reconstruction               0-001-016  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0347FP Reconstruction               0-001-FP1  06/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Old Nyack HS Leased to BOCES:
92-0199   Reconstruction               0-003-004  09/02/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0578   Reconstruction               0-003-005  01/04/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0158   Reconstruction               0-003-006  09/26/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0676   Reconstruction               0-003-007  12/05/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-1               524                  05/23/03   06/05/03    David L. Kempton                    
                                                            H-2             1,200                  05/23/03   06/05/03    David L. Kempton                    
                                                            H-3               262                  05/23/03   06/05/03    David L. Kempton                    
                                                            H-4             3,487                  05/23/03   06/05/03    David L. Kempton                    
                                                            H-5               106                  05/23/03   06/05/03    David L. Kempton                    
                                                            H-6               942                  05/23/03   06/05/03    David L. Kempton                    
                                                            H-7             4,741                  05/23/03   06/05/03    David L. Kempton                    
                                                            H-8             5,306                  05/23/03   06/05/03    David L. Kempton                    
 
02-2255   Reconstruction               0-003-008  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-1           -11,029                  12/23/05   02/23/06    DME Construction Assoc              
 
03-1194   Reconstruction               0-003-009  06/30/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           6,885                  05/24/05   05/24/05    Fanshawe Inc                        
                                                            EC-02          14,933                  12/23/05   02/23/06    Fanshawe                            
                                                            EC-03           6,960                  12/23/05   01/19/06    Fanshawe                            
                                                            EC-04          13,290                  12/23/05   01/19/06    Fanshawe Inc                        
                                                            EC-05           5,212                  06/23/06   11/30/06    Fanshawe                            
                                                            EC-06           2,496                  06/23/06   11/30/06    Fanshawe                            
                                                            EC-07           2,335                  01/10/07   03/23/07    Fasnshaws Inc                       
                                                            GW-06          18,260                  03/28/06   06/13/06    Holt Construction                   
                                                            GW-07          -7,994                  10/08/08   03/19/09    HOLT CONSTRUCTION                   
                                                            GW-08               0                  10/08/08   03/19/09    HOLT CONSTRUCTION                   
                                                            GW-09          -5,000                  10/08/08   03/19/09    HOLT CONSTRUCTION                   
                                                            GW-1           12,691                  12/23/05   05/24/06    Holt Construction                   
                                                            GW-2           10,096                  12/23/05   02/23/06    Holt Construction                   
                                                            GW-3            5,900                  12/23/05   02/23/06    Holt Construction                   
                                                            GW-4            6,445                  12/23/05   02/23/06    Holt Construction                   
                                                            GW-5            4,955                  12/23/05   02/23/06    Holt Construction                   
                                                            HC-01          15,900                  05/24/05   05/24/05    David Kempton                       
                                                            HW-02          -6,850                  06/23/06   03/09/07    David Kempton                       
                                                            HW-03           9,440                  06/23/06   02/05/10    DAVID KEMPTON                       
                                                            HW-04           4,322                  02/14/08     /  /      DAVID L KEMPTON                     
                                                            HW-04           4,322                  09/09/08   07/08/09    David L. Kempton                    
                                                            MC-01          25,800                  03/28/06   06/13/06    Milcon Construction                 
                                                            MC-02          30,133                  03/28/06   06/13/06    Milcon Construction                 
                                                            SW-01          12,777                  12/23/05   05/24/06    Ascape Landscape Construction       
                                                            SW-02           3,932                  12/23/05   02/23/06    ASCApe Landscape Construction       
 
03-1503   Reconstruction               0-003-010  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0436   Reconstruction               0-003-011  02/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            GC-01           2,000                  01/30/12   12/04/12    Arrow Steel Window Corp.            
                                                            GC-02            -590                  01/30/12   12/04/12    Arrow Steel Window Company          
 
13-1200   Reconstruction               0-003-012  04/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4               2,771                  09/15/14   09/18/14    Standback General Contractors, LLC  
                                                            5              14,439                  09/15/14   09/18/14    Standlback General Contractors, LLC 
                                                            6               7,356                  09/15/14   09/18/14    Standlback General Contractors, LLC 
 
16-0704   Reconstruction               0-003-013  02/18/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,908                  01/13/20   02/12/20    SENCO METALS, LLC                   
                                                            1              55,380                  09/15/17   10/17/17    Arrow Steel Window Corp.            
                                                            2               4,192                  01/13/20   02/12/20    SENCO METALS, LLC                   
 
14-0358   Reconstruction               0-003-014  06/09/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1544   Reconstruction               0-003-015  04/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1055   Reconstruction               0-003-016  03/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001          -184,195                  01/24/19   01/24/19    Simplex Grinell                     
 
19-1704   Reconstruction               0-003-018  06/16/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0344   Reconstruction               0-003-FP1  06/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nyack Middle School:
94-0476   Reconstruction               0-004-003  12/13/94  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1504   Reconstruction               0-004-004  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0103   Reconstruction               0-004-005  03/03/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,260                  09/29/06   10/19/06    JMK enterprises                     
                                                            2               3,652                  03/13/06   06/18/07    JMK Enterprises                     
                                                            3              28,542                  01/16/08   01/23/08    JMK Enterprises                     
                                                            4              18,260                  01/16/08   01/23/08    JMK Enterprises                     
 
07-0801   Reconstruction               0-004-008  12/10/07  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1685   Reconstruction               0-004-009  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,242                  12/28/15   04/19/16    STANDBACK GENERAL CONTRACTORS, LLC  
 
12-1199   Reconstruction               0-004-010  05/23/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,900                  10/28/13   11/18/13    NSC Abatement Services Inc.         
                                                            2              -2,366                  11/25/13   12/18/13    NSC ABATEMENT SERVICES, INC.        
 
16-0151   Reconstruction               0-004-011  04/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            14,825                  05/28/19   05/29/19    pearl river plumbing,heating & elect
                                                            001            -2,388                  05/28/19   05/29/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            34.2-001       -1,606                  05/03/19   05/06/19    JOSEPH LOMBARDO PLUMBING & HEATING  
                                                            36.1-001        8,934                  07/01/19   07/05/19    ACS SYSTEM ASSOCIATES, INC.         
                                                            36.2-001      -10,140                  05/03/19   05/06/19    JOSEPH LOMBARDO PLUMBING & HEATING  
 
15-1545   Reconstruction               0-004-012  04/25/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1608   Reconstruction               0-004-015  05/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0985   Reconstruction               0-004-016  02/11/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001            741                  09/09/20   11/06/20    FANSHAWE, INC.                      
                                                            EC-002          3,295                  10/05/20   12/03/20    FANSHAWE, INC.                      
                                                            EC-003          7,151                  12/04/20   02/03/21    FANSHAWE, INC.                      
                                                            EC-004          3,176                  01/11/21   03/10/21    FANSHAWE, INC.                      
                                                            EC-005          1,669                  11/23/21   12/14/22    Fanshawe Inc                        
                                                            GC-001         10,659                  10/05/20   12/09/20    VINCO BUILDERS, LLC                 
                                                            GC-002          9,353                  10/20/20   12/31/20    VINCO BUILDERS, LLC                 
                                                            GC-003          3,448                  10/20/20   12/31/20    VINCO BUILDERS, LLC                 
                                                            GC-004          6,403                  10/20/20   12/31/20    VINCO BUILDERS, LLC                 
                                                            GC-005          4,633                  10/20/20   12/31/20    VINCO BUILDERS, LLC                 
                                                            GC-006          3,152                  05/19/21   06/14/21    Vinco Builders                      
                                                            MC-001          3,518                  10/05/20   12/03/20    HAUSER BROTHERS, INC.               
 
19-1705   Reconstruction               0-004-017  03/17/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0032   Reconstruction               0-004-018  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1859   Reconstruction               0-004-019  07/30/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002         21,760                  03/21/22   03/29/23    Key Const Servs LLC                 
                                                            GC-003          3,439                  03/21/22   03/29/23    Key Const Servs LLC                 
                                                            GC-007          1,884                  09/13/22   10/03/23    Key Construction Services, LLC      
                                                            GC-01           1,846                  03/21/22   03/29/23    Key Const Servs LLC                 
                                                            GC-04          10,080                  08/22/22   03/30/23    Key Const Servs LLC                 
                                                            GC-05           5,145                  08/22/22   03/30/23    Key Const Servs LLC                 
                                                            GC-06           3,265                  08/22/22   03/30/23    Key Const Servs LLC                 
                                                            MS-001         -8,000                  09/30/21   12/01/22    Grace Contracting&Development, LLC  
                                                            MS-002          2,841                  04/29/22   05/22/23    Grace Contr&Dev LLC                 
                                                            MS-003         14,916                  04/29/22   05/22/23    Grace Contr&Dev LLC                 
                                                            MS-004         13,990                  04/29/22   05/22/23    Grace Contr&Dev LLC                 
                                                            MS-05          -2,900                  04/29/22   05/22/23    Grace Contr&Dev LLC                 
 
22-0183FA Reconstruction               0-004-020  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0345FP Reconstruction               0-004-FP1  06/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXXHilltop Admin(see 1-005)FrmrIntSc:
90-1667   Reconstruction               0-005-002  06/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1505   Reconstruction               0-005-004  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0802   Reconstruction               0-005-005  12/10/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           8,612                  09/12/08   11/06/08    HVS Electric and Construction       
                                                            EC-5            6,191                  11/14/08   07/07/09    HVS ELECTRIC AND CONSTRUCTION       
 
12-0512   Reconstruction               0-005-006  12/20/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              9,706                  08/01/13   08/09/13    WB Contracting                      
 
14-0926   Reconstruction               0-005-008  02/13/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0927   Reconstruction               0-005-009  02/13/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Liberty Elementary School:
01-0813   Reconstruction               0-006-006  03/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,500                  09/04/02   10/21/02    Universal Construction              
 
03-1506   Reconstruction               0-006-007  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0803   Reconstruction               0-006-008  12/10/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           1,508                  09/12/08   11/06/08    HVS Electric & Construction         
 
08-1719   Reconstruction               0-006-009  06/22/09  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1390   Reconstruction               0-006-010  06/14/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           4,000                  01/28/13   04/26/13    LORENCIN CONTRACTING CORP           
 
17-0439   Reconstruction               0-006-011  05/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              37,465                  08/29/19   08/29/19    B&B CONTRACTING GROUP               
                                                            1               5,732                  09/26/19   09/27/19    EMPIRE ENERGY SPECIALISTS, INC.     
                                                            1               2,407                  01/21/20   02/25/20    BERTUSSI'S CONTRACTING SERVICES     
                                                            1               5,919                  07/06/20   08/14/20    MDS HVAC-R, INC.                    
                                                            1R             -6,100                  01/21/20   02/25/20    TRISTATE CONSTRUCTION               
                                                            2               2,456                  08/29/19   08/29/19    B&B CONTRACTING GROUP               
                                                            3               5,980                  09/26/19   09/27/19    B&B CONTRACTING GROUP               
                                                            4               3,559                  01/28/20   02/19/20    B&B CONTRACTING GROUP               
 
18-1609   Reconstruction               0-006-013  05/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0982   Reconstruction               0-006-014  03/31/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001           -748                  01/28/22   01/25/23    HVS LLC                             
                                                            EC-002         -2,557                  10/31/22   11/15/23    HVS LLC                             
                                                            GC-001          2,079                  10/04/21   12/02/22    Key Construction Services, LLC      
                                                            GC-002          4,548                  12/27/21   11/01/22    Key Const Servs LLC                 
                                                            GC-003         33,696                  01/28/22   02/01/23    Key Const Servs LLC                 
                                                            GC-004          1,346                  01/28/22   02/01/23    Key Const Servs LLC                 
                                                            GC-005          2,898                  08/22/22   12/14/23    Key Const Servs LLC                 
                                                            GC-006         15,255                  08/22/22   12/14/23    Key Const Servs LLC                 
                                                            GC-007          5,292                  11/21/22   09/07/23    KEY CONSTRUCTION SERVICES LLC       
                                                            MC-001            598                  01/28/22   01/25/23    HVAC-R Inc                          
                                                            MC-02           1,339                  03/21/22   04/04/23    MDSS HVAC-R Inc                     
                                                            MC-03           8,867                  03/21/22   04/04/23    MDS HVAC-R Inc                      
                                                            MC-04           1,475                  03/21/22   04/04/23    MDS HVAC-R Inc                      
 
20-0033   Reconstruction               0-006-015  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0184FA Reconstruction               0-006-016  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0348FP Reconstruction               0-006-FP1  06/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Upper Nyack Elementary School:
90-1668   Reconstruction               0-007-007  06/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0812   Reconstruction               0-007-009  03/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,100                  09/04/02   10/21/02    Universal Construction              
 
03-1507   Reconstruction               0-007-010  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0024   Reconstruction               0-007-011  07/12/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0804   Reconstruction               0-007-012  12/10/07  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1201   Reconstruction               0-007-013  04/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,728                  09/15/14   09/18/14    Standback General Contractors, LLC  
                                                            2               2,332                  09/15/14   09/18/14    Standback General Contractors, LLC  
 
13-1686   Reconstruction               0-007-014  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,659                  12/28/15   04/19/16    HAUSER BROS INC                     
                                                            1               1,900                  12/28/15   04/19/16    HVS LLC                             
                                                            2              -6,500                  12/28/15   04/19/16    HAUSER BROS INC                     
                                                            2                 476                  12/28/15   04/19/16    HVC LLC                             
                                                            3                 748                  12/28/15   04/19/16    HVS LLC                             
                                                            4               2,009                  12/28/15   04/19/16    HVS LLC                             
                                                            5                 994                  12/28/15   04/19/16    HVS LLC                             
 
16-0152   Reconstruction               0-007-015  04/25/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,351                  01/28/20   02/26/20    EMPIRE ENERGY SPECIALISTS, INC.     
 
15-1546   Reconstruction               0-007-016  04/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -10,000                  01/30/17   02/01/17    More Consulting Corp.               
 
18-1103   Reconstruction               0-007-018  02/14/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1610   Reconstruction               0-007-019  05/13/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005               918                  08/27/21   05/11/22    LYCHINIDOS LLC                      
 
19-1389   Reconstruction               0-007-020  05/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0983   Reconstruction               0-007-021  03/31/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          3,581                  10/04/21   12/02/22    Key Construction Services, LLC      
                                                            GC-002          6,913                  01/18/22   12/27/22    Key Const Servs LLC                 
                                                            GC-003         14,520                  08/22/22   12/14/23    Key Const Servs LLC                 
                                                            GC-18             925                  01/14/22   12/27/22    Bouley Assoc Inc                    
 
20-0034   Reconstruction               0-007-022  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0185FA Reconstruction               0-007-023  05/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0346FP Reconstruction               0-007-FP1  06/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
03-1508   Reconstruction               0-021-003  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0805   Reconstruction               0-021-005  12/10/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           2,761                  09/12/08   11/06/08    HVS Electric & Construction         
                                                            EC-04           1,243                  09/12/08   11/06/08    HVS Electric & Construction         
 
11-0927   Reconstruction               0-021-006  03/14/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3              14,025                  10/28/13   12/06/13    Hear Construction                   
                                                            GC-01         -79,842                  01/28/13   04/26/13    LORENCIN CONSTRUCTION CORP          
                                                            GC-02           2,500                  07/01/13   07/26/13    LORENCIN CONTRACTING CORP           
 
13-1687   Reconstruction               0-021-007  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              48,900                  12/28/15   04/19/16    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            E01             6,600                  04/04/16   12/28/16    Fanshawe, Inc.                      
                                                            FE-01          13,302                  06/08/16   01/13/17    The LA Group                        
                                                            fc-01         -17,500                  06/08/16   01/13/17    The LA Group                        
 
15-0057   Reconstruction               0-021-008  03/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,702                  09/19/16   10/18/16    Joseph Lombardo Plumbing/Heating/Coo
                                                            001            -2,636                  01/30/17   02/06/17    More Consulting Corp.               
                                                            002             2,636                  09/19/16   10/18/16    Joseph Lombardo Plumbing/Heating/Coo
                                                            002           -10,000                  01/30/17   02/06/17    More Consulting Corp.               
                                                            003            21,695                  09/19/16   10/18/16    Joseph Lombardo Plumbing/Heating/Coo
                                                            003            -2,422                  01/30/17   02/06/17    More Consulting Corp.               
                                                            004           -19,990                  04/12/17   04/21/17    More Consulting Corp.               
                                                            004            17,151                  04/09/19   04/12/19    Joseph Lombardo Plumbing            
                                                            005             2,422                  01/30/17   08/24/17    Joseph Lombardo Plumbing, Heating, a
                                                            005             2,422                  04/10/19   04/12/19    Joseph Lombardo Plumbing Heating & C
                                                            E-1            18,502                  03/29/18   05/31/18    Fanshawe Inc dba Rockland Electric  
                                                            E-2            19,981                  03/29/18   05/31/18    Fanshawe Inc dba Rockland Electric  
                                                            M-4            12,851                  01/06/17   01/10/17    Joseph Lomardo Plumbing/Heating/Cool
                                                            P-1             6,680                  09/19/16   10/18/16    Joseph Lombardo Plumbing/Heating/coo
                                                            P-2             1,540                  09/19/16   10/18/16    Joseph Lombardo Plumbing/Heating/coo
 
19-1169   Reconstruction               0-021-009  08/25/20  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0116   Reconstruction               0-021-010  04/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,575                  11/20/17   12/14/17    BJB Construction Corp.              
 
18-1104   Reconstruction               0-021-011  02/14/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1611   Reconstruction               0-021-012  05/13/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002               918                  08/27/21   05/11/22    LYCHINIDOS, LLC                     
 
18-2082   Reconstruction               0-021-013  07/29/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0986   Reconstruction               0-021-014  02/11/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          2,659                  10/05/20   12/03/20    FANSHAWE, INC.                      
                                                            EC-002         16,037                  10/05/20   12/03/20    FANSHAWE, INC.                      
                                                            EC-003          2,232                  10/05/20   12/02/20    FANSHAWE, INC.                      
                                                            EC-004          4,019                  12/04/20   02/03/21    FANSHAWE, INC.                      
                                                            EC-005          3,176                  01/11/21   03/10/21    FANSHAWE, INC.                      
                                                            EC-006          1,561                  11/23/21   12/14/22    Fanshawe Inc                        
                                                            EC-007          1,291                  11/23/21   12/14/22    Fanshawe Inc                        
                                                            EC-008          1,316                  11/23/21   12/14/22    Fanshawe Inc                        
                                                            GC-001          2,249                  09/09/20   11/17/20    VINCO BUILDERS, LLC                 
                                                            GC-002          2,628                  09/09/20   11/17/20    VINCO BUILDERS, LLC                 
                                                            GC-003         21,843                  09/09/20   11/17/20    VINCO BUILDERS, LLC                 
                                                            GC-004          6,171                  10/05/20   12/09/20    VINCO BROTHERS, LLC                 
                                                            MC-001          2,996                  10/05/20   12/03/20    HAUSER BROTHERS, INC.               
                                                            MC-002          4,042                  01/11/21   03/10/21    HAUSER BROTHERS, INC.               
                                                            MC-003          3,375                  02/02/21   03/25/21    HAUSER BROTHERS, INC.               
 
20-0035   Reconstruction               0-021-015  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0540   Reconstruction               0-021-017  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hilltop Admin - Lsd by Nyack College:
19-1168   Reconstruction               1-005-001  08/25/20  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1519   Reconstruction               1-005-002  05/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1612   Reconstruction               1-005-004  05/13/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001              -922                  08/27/21   05/11/22    LYCHINIDOS LLC                      
                                                            003             2,966                  08/27/21   05/11/22    LYCHINIDOS, LLC                     
                                                            004               918                  08/27/21   05/11/22    LYCHINIDOS, LLC                     
 
20-0036   Reconstruction               1-005-005  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1730   Reconstruction               1-005-006  06/14/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          1,614                  09/01/23   01/08/24    ADP GROUP INC                       
                                                            GC-002            875                  09/01/23   01/08/24    ADP GROUP INC                       
                                                            GC-003          9,263                  09/01/23   01/08/24    ADP GROUP INC                       
                                                            GC-004          7,740                  09/01/23   01/08/24    ADP GROUP INC                       
                                                            MC-001          3,722                  06/26/23   12/29/23    BERTUSSI CONTRACTING                
 

          Wood Shop Annex-Old Nyack HS:
16-1038   Reconstruction               2-015-001  02/18/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Field Storage Container #1:
20-0037   Reconstruction               2-034-002  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maint. Gar./Field House (fmly 5-019):
18-1337   Reconstruction               3-019-001  05/02/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0038   Reconstruction               3-019-002  09/01/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXField House Bus Garage (now 3-019:
15-0058   Reconstruction               5-019-001  03/22/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Exhibitn Field PressBox/Toil/Concess:
15-0059   New Construction             7-031-001  03/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -19,118                  03/29/18   04/23/18    Nurzia Construction Corporation     
                                                            001            11,662                  05/03/19   05/29/19    NURZIA CONSTRUCTION CORP.           
                                                            002             2,636                  03/29/18   04/23/18    Nurzia Construction Corporation     
                                                            002            28,342                  05/03/19   05/29/19    NURIA CONSTRUCTION CORP.            
                                                            003               433                  05/03/19   05/29/19    NURZIA CONSTRUCTION CORP.           
                                                            E-1            18,502                  12/19/16   01/10/17    Fanshawe, Inc, dba Rockland Electric
                                                            E-2            19,981                  12/19/16   01/10/17    Fanshawe, Inc, dba Rockland Electric
                                                            MECH-001        2,025                  05/03/19   05/06/19    PEARL RIVER PLUMBING & HEATING INC. 
 

          District-Wide:
91-1552   Reconstruction               7-999-002  07/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1740   Reconstruction               7-999-003  08/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1347   Reconstruction               7-999-004  07/18/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1212   Reconstruction               7-999-005  06/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,384                  12/08/14   12/18/14    Fanshawe, Inc.                      
                                                            2               3,760                  12/08/14   12/18/14    Fanshawe, Inc.                      
 
15-1970   Reconstruction               7-999-006  07/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE

PEARL RIVER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-03-08-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Evans Park School:
91-0352   Reconstruction               0-002-003  11/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1191   Reconstruction               0-002-004  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1505   Reconstruction               0-002-005  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0841   Reconstruction               0-002-006  05/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0624   Additions and Alterations    0-002-008  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-04        3,240                  01/23/08   04/02/08    FANSHAWE INC                        
 
08-0552   Reconstruction               0-002-009  03/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1303   Reconstruction               0-002-010  12/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0727   Reconstruction               0-002-011  05/19/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001         -5,073                  11/26/12   08/12/13    PEARL RIVER P/H/E dba BERTUSSI'S    
 
17-1034   Reconstruction               0-002-012  06/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01E          6,091                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-02E            631                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-03E          6,502                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-04E          4,337                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-05E          4,800                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-06E          1,997                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-07E            836                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-08E          4,314                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-09E            433                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            GC-01E         17,932                  07/02/19   07/15/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-02E         19,743                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-03E          2,138                  07/02/19   07/11/19    PEARL RIVER PLUMBING.HEATING & ELECT
                                                            GC-04E          1,167                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-05E          3,598                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-06E          1,382                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-07E          5,190                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-08E          9,317                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-09E          2,214                  07/02/19   07/19/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-10E          5,971                  07/02/19   07/11/19    PEARL RIVER PLUMBING.HEATING & ELECT
                                                            GC-11E           -229                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-01E         -3,256                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-02E        -65,440                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-03E            112                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-04E          2,244                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-05E          2,293                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-01E            645                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-02E          1,026                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-03E            938                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
 
21-1414   Reconstruction               0-002-014  10/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lincoln Ave.Elementary School:
91-0353   Reconstruction               0-003-003  11/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1192   Reconstruction               0-003-005  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1504   Reconstruction               0-003-006  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0842   Reconstruction               0-003-007  05/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0625   Additions and Alterations    0-003-009  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-05        2,439                  01/23/08   04/02/08    FANSHAWE INC                        
                                                            CO-EC-06        2,630                  07/14/08   08/26/08    FANSHAWE, INC. DBA ROCKLAND ELECTRIC
                                                            EC-01           3,466                  07/15/08   07/29/08    Richard Parker Electrical           
                                                            EC-03          19,300                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            PC-12           3,608                  05/18/09   09/22/09    PEARL RIVER PLUMBING HEATING & ELECT
 
03-1448   Reconstruction               0-003-010  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            Roof 01        61,565                  05/24/06   06/23/06    Best roofing of new Jersey          
                                                            Root 02         7,028                  05/24/06   06/23/06    Best Roofing                        
 
09-1304   Reconstruction               0-003-011  12/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1051   Reconstruction               0-003-012  06/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01L          6,091                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-02L          7,539                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-03L          6,502                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-04L          5,782                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-05L         10,638                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-06L          5,134                  07/02/19     /  /      FANSHAWE, INC.                      
                                                            EC-07L          1,997                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-08L          1,673                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-10L            433                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            GC-01L          4,000                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-02L          6,176                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-03L          2,138                  07/02/19   10/07/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-04L          1,166                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-05L          3,549                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-06L          7,389                  07/02/19   07/15/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-07L            372                  07/02/19   07/15/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-08L           -302                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-01L         -3,256                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-02L        -65,440                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-03L            112                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-04L          2,244                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-05L          2,293                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-01L          4,398                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-02L            645                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-03L          2,815                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
 
21-1415   Reconstruction               0-003-014  10/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
91-0354   Reconstruction               0-009-007  11/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1193   Reconstruction               0-009-009  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1502   Reconstruction               0-009-010  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0843   Reconstruction               0-009-011  05/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0478   Additions and Alterations    0-009-012  03/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,500                  08/07/01   01/08/02    DeRosa Tennis Contractors           
                                                            1              25,280                  08/07/01   01/08/02    Key Interiors                       
                                                            1              31,000                  10/16/01   03/15/02    Pearl River Plumbing                
                                                            2              55,164                  08/07/01   02/11/02    Key Interiors                       
                                                            3              18,500                  08/07/01   02/21/02    Key Interiors                       
                                                            4              26,700                  10/16/01   03/15/02    Key Interiors                       
                                                            E-1            21,500                  07/31/01   03/28/02    Fanshawe                            
                                                            E-2            13,500                  10/16/01   02/21/02    Fanshawe                            
 
02-2083   Reconstruction               0-009-013  05/01/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              85,972          85,972  09/17/03   09/22/03    W. Harris & Sons                    
 
04-0626   Additions and Alterations    0-009-014  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-01          977                  01/23/08   04/02/08    FANSHAWE INC                        
                                                            CO-EC-17        7,639                  03/27/09   07/03/09    Helmer-Cornin Construction,Inc      
                                                            EC-04           5,279                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-05          19,664                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-06          19,800                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-09           2,751                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-10             365                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-13             178                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-14           1,900                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-15           1,697                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            GC-05           7,721                  03/27/09   07/03/09    HELMER CRONIN CONSTRUCTION, INC.    
                                                            GC-13          15,170                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-17           7,639                  03/27/09     /  /      HELMER-CRONIN CONSTRUCTION, INC.    
                                                            MC-01          19,674                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-02          12,841                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-03          10,132                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-06          19,380                  10/29/07   01/25/08    Pearl River Plumbing,Heating & Elect
                                                            MC-09          14,667                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-10          19,674                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-17          13,536                  10/29/07   01/28/08    PEARL RIVER PLUMBING HEATING        
                                                            MC-18          14,037                  10/29/07   01/24/08    Pearl River Plumbing, Heating & Elec
                                                            MC-19          17,436                  10/29/07   01/24/08    Pearl River Plumbing, Heating & Elec
                                                            PC-05           1,072                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            PC-06           2,344                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            PC-07             524                  05/18/09   07/30/09    PEARL RIVER HEATING                 
                                                            PC-09           1,802                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            PC-11             362                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            PC-13          19,829                  05/18/09   09/22/09    PEARL RIVER PLUMB, HEAT & ELECT     
                                                            PC-14          -1,060                  05/18/09   09/22/09    PEARL RIVER PLUMB HEAT ELECT        
                                                            PC-15           8,245                  05/18/09   09/22/09    PEARL RIVER PLUMB HEAT ELECT        
                                                            RC-03          10,323                  07/31/07   08/20/07    Milcon Construction                 
                                                            RC-06           4,743                  07/31/07   08/20/07    Milcon Construction                 
                                                            RC-08          10,998                  07/31/07   08/20/07    Milcon Construction                 
                                                            RC-09           2,800                  07/31/07   08/20/07    Milcon Construction                 
                                                            RC-10         -14,037                  07/31/07   08/20/07    Milcon Construction Corp            
                                                            SC-01           7,269                  04/16/09   07/29/09    W. HARRIS & SON INC                 
                                                            SC-02          17,735                  04/16/09   07/29/09    W. HARRIS & SON INC                 
                                                            SC-03           8,680                  04/16/09   07/29/09    W. HARRIS & SON INC                 
                                                            SC-04          48,413                  04/16/09   07/29/09    W. HARRIS & SON INC                 
                                                            SC-05           8,093                  04/16/09   07/29/09    W. HARRIS & SON INC                 
                                                            SC-06           9,782                  04/16/09   07/29/09    W. HARRIS & SON INC                 
                                                            SC-14          42,157                  04/16/09   07/29/09    W. HARRIS & SON INC                 
                                                            SC-16          42,989                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-19           5,748                  04/16/09   07/29/09    W. HARRIS & SON INC                 
 
03-1447   Reconstruction               0-009-015  06/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1055   Reconstruction               0-009-016  06/01/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1305   Reconstruction               0-009-017  12/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0728   Reconstruction               0-009-018  05/19/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001         34,410                  11/26/12   08/12/13    PEARL RIVER P/H/E dba BERTUSSI'S    
 
11-0567   Reconstruction               0-009-019  04/09/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001        -47,300                  08/23/12   12/10/12    KEY INTERIORS LLC                   
                                                            01-002         10,196                  09/28/12   02/15/13    KEY INTERIORS LLC                   
                                                            01-003           -806                  03/14/13   05/31/13    KEY INTERIORS LLC                   
                                                            02-001        -29,200                  07/19/12   01/15/13    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            02-002         10,262                  11/09/12   02/25/13    Pearl River Plumbing Heating & Elect
                                                            03-001         10,529                  11/09/12   02/25/13    Pearl River Plumbing Heating & Elect
                                                            04-001        -21,000                  09/18/12   01/08/13    HVS LLC ELECTRICAL CONSTRUCTION     
                                                            04-002          9,661                  09/28/12   02/18/14    HVS LLC ELECTRICAL CONSTRUCTION     
 
14-1711   Reconstruction               0-009-020  09/22/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1271   Reconstruction               0-009-022  05/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0815   Reconstruction               0-009-023  02/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADEC4-11            0                  07/27/21   03/29/22    HVS INC                             
                                                            ADEC4001            0                  12/22/20   03/12/21    HVS, INC.                           
                                                            ADEC4002            0                  12/22/20   03/12/21    HVS, INC.                           
                                                            ADEC4003            0                  12/22/20   03/12/21    HVS, INC.                           
                                                            ADEC4004            0                  12/22/20   03/12/21    HVS, INC.                           
                                                            ADEC4005            0                  12/28/20   03/02/21    HVS, INC.                           
                                                            ADEC4005            0                  07/27/21   03/29/22    HVS, INC                            
                                                            ADEC4006            0                  12/22/20   03/12/21    HVS, INC.                           
                                                            ADEC4007            0                  04/27/21   08/03/21    HVS, INC.                           
                                                            ADEC4008            0                  04/27/21   08/03/21    HVS, INC.                           
                                                            ADEC4009            0                  04/27/21   08/03/21    HVS, INC.                           
                                                            ADEC4010            0                  04/27/21   08/03/21    HVS, INC.                           
                                                            ADGC1001            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1002            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1003            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1004            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1005            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1006            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1007            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1008            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1009            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1010            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1011            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1012            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1013            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1014            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1015            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1016            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1017            0                  03/29/21   05/06/21    BERTUSSI CONTRACTING, INC.          
                                                            COEC4001       14,634                  07/27/21   03/29/22    HVS, INC                            
                                                            EC-04-02        2,329                  09/09/21   11/28/22    HVS, Inc                            
                                                            EC-04-03       10,732                  09/09/21   11/30/22    HVS, Inc                            
                                                            EC-04-04       18,958                  09/09/21   11/30/22    HVS, Inc                            
                                                            EC-04-04        3,133                  02/04/22   02/08/23    HVS Inc                             
                                                            EC-04-05       10,437                  02/04/22   02/08/23    HVS Inc                             
                                                            EC-04-06       12,275                  02/04/22   02/08/23    HVS Inc.                            
                                                            EC-04-07         -665                  02/04/22   02/08/23    HVS Inc                             
                                                            EC-04-08        2,061                  02/04/22   02/08/23    HVS Inc                             
                                                            EC-4-09            72                  03/11/22   02/22/23    HVS Inc                             
                                                            MC-02-01       15,814                  03/31/22     /  /      Bertussi Contr Inc                  
                                                            PC-03-01        7,912                  08/24/22   04/20/23    Bertussi Contrg Inc                 
                                                            PC-03-02       21,360                  08/24/22   04/20/23    Bertussi Contr Inc                  
                                                            PC-03-03        6,628                  08/24/22   04/20/23    Bertussi Contrs Inc                 
 
18-1456   Reconstruction               0-009-025  06/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          2,469                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-003          2,367                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-004          4,922                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-005          8,658                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-006            539                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-007         12,773                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-008         14,463                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-011        -37,500                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            GC-010        -46,145                  07/02/20   08/12/20    BERTUSSI CONTRACTING, INC.          
                                                            GC001HS         6,100                  06/04/21   01/13/22    Bertussi Contracting INC            
                                                            GC002HS        10,577                  06/04/21   01/13/22    Bertussi Contracting INC            
                                                            GC003HS        13,967                  06/04/21   01/13/22    Bertussi's Contracting Inc          
                                                            GC006HS        20,000                  06/04/21   01/13/22    Bertussi Contracting INC            
                                                            GCCO004H       15,000                  04/12/22   04/12/22    BERTUSSI CONTRACTING                
                                                            GCCO005H       24,063                  04/12/22   04/12/22    BERTUSSI CONTRACTING                
                                                            MC-001         -5,000                  07/02/20   08/11/20    BERTUSSI CONTRACTING, INC.          
                                                            PC-003        -19,000                  07/02/20   08/11/20    BERTUSSI CONTRACTING, INC.          
                                                            PC001HS        44,178                  06/04/21   04/12/22    Bertussi Contracting INC            
                                                            PC002HS         9,765                  06/04/21   03/29/22    Bertussi Contracting INC            
 
21-1416   Reconstruction               0-009-026  10/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Franklin Ave. Elementary:
91-0355   Reconstruction               0-010-002  11/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1503   Reconstruction               0-010-004  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0844   Reconstruction               0-010-005  05/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0479   Additions and Alterations    0-010-006  03/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01            3,830                  05/09/03   05/20/03    All Bright Electric                 
 
04-0627   Additions and Alterations    0-010-007  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-03        1,795                  01/23/08   04/02/08    FANSHAWE INC                        
                                                            EC-07           2,630                  07/15/08   07/29/08    Rockland Electric                   
                                                            EC-11           1,142                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            GC-06          13,013                  03/27/09   07/03/09    HELMER CRONIN CONSTRUCTION, INC.    
                                                            GC-10          18,064                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-15          16,687                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-16           9,264                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-18          13,707                  06/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-19          15,372                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            MC-04          10,132                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-11           5,301                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-16          12,252                  10/29/07   01/24/08    Pearl River Plumbing, Heating & Elec
                                                            MC-17          13,536                  10/29/07     /  /      Pearl River Plumbing, Heating & Elec
                                                            MC-21          18,033                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-22          18,033                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-23           6,099                  10/29/07   01/25/08    Pearl River Plumbing, Heating & elec
                                                            PC-03             177                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            PC-04           1,072                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            PC-08           1,375                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
 
08-0553   Reconstruction               0-010-008  03/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1306   Reconstruction               0-010-009  12/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0729   Reconstruction               0-010-010  05/19/11  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1035   Reconstruction               0-010-011  06/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01F         10,890                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-02F          1,132                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-03F          6,502                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-04F          4,130                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-05F          6,900                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-06F          5,134                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-07F          1,997                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-08F            836                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-09F          1,202                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            EC-09L          2,282                  07/02/19   07/08/19    FANSHAWE, INC.                      
                                                            GC-01F          2,952                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-02F          7,917                  07/02/19   07/11/19    PEARL RIVER PLUMBING.HEATING & ELECT
                                                            GC-03F          1,988                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-04F          1,167                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-05F         26,845                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-06F          4,337                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-07F          5,700                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-08F          6,265                  07/02/19   07/11/19    PEARL RIVER PLUMBUING,HEATING & ELEC
                                                            GC-09F          6,595                  07/02/19   07/11/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-10F            822                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-11F          4,333                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            GC-12F           -274                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-01F         -3,256                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-02F            112                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-03F          2,244                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-04F         49,622                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            MC-05F          8,657                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-01F          4,222                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-02F            938                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            PC-03F            645                  07/02/19   07/08/19    PEARL RIVER PLUMBING,HEATING & ELECT
 
21-1417   Reconstruction               0-010-013  10/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
91-0356   Reconstruction               0-011-004  11/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1194   Reconstruction               0-011-006  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1375   Reconstruction               0-011-007  05/15/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1500   Reconstruction               0-011-008  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0845   Reconstruction               0-011-009  05/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0480   Additions and Alterations    0-011-010  03/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              20,000                  05/09/03   05/20/03    B&R Roofing                         
                                                            2              46,974                  05/09/03   05/20/03    B&R Roofing                         
                                                            3              46,500                  05/09/03   05/20/03    B&R Roofing                         
                                                            4              39,600                  05/09/03   05/20/03    B&R Roofing                         
                                                            5              29,400                  10/16/01   03/15/02    B&R Roofing                         
                                                            6              38,700                  05/09/03   05/20/03    B&R Roofing                         
 
02-2082   Reconstruction               0-011-011  05/01/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0628   Additions and Alterations    0-011-012  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-02        1,300                  01/23/08   04/02/08    FANSHAWE INC                        
                                                            CO-GC-05        7,721                  04/16/09   07/29/09    HELMER-CRONIN CONSTRUCTION INC      
                                                            EC-02           4,021                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-07           3,899                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-08           1,250                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            EC-12             716                  03/27/09   07/03/09    ALL BRIGHT ELECTRIC                 
                                                            GC-01           7,094                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-02          10,557                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-03          17,296                  03/27/09   07/03/09    HELMER CRONIN CONSTRUCTION, INC.    
                                                            GC-04           2,408                  03/27/09   07/03/09    HELMER CRONIN CONSTRUCTION, INC.    
                                                            GC-07          19,998                  03/27/09   07/03/09    HELMER CRONIN CONSTRUCTION, INC.    
                                                            GC-07A         10,722                  03/27/09   07/03/09    HELMER CRONIN CONSTRUCTION, INC.    
                                                            GC-08               0                    /  /       /  /                                          
                                                            GC-08          -2,762                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-09           1,309                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-11           4,388                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-12          -1,200                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            GC-14             647                  03/27/09   07/03/09    HELMER-CRONIN CONSTRUCTION, INC.    
                                                            MC-05          17,613                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-07           1,590                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-08          19,439                  10/29/07   01/25/08    Pearl River Plumbing, Heating & Elec
                                                            MC-12           3,000                  10/29/07   01/24/08    Pearl River Plumbing, Heating & elec
                                                            MC-13           3,000                  10/29/07   01/24/08    Pearl River Plumbing, Heating & Elec
                                                            MC-14          11,230                  10/29/07   01/24/08    Pearl River Plumbing, Heating & Elec
                                                            MC-15          18,536                  10/29/07   01/24/08    Pearl River Plumbing, Heating & Elec
                                                            MC-20           1,178                  10/29/07     /  /      Pearl River Plumbing, Heating & Elec
                                                            PC-01           1,100                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            PC-10             969                  05/18/09   07/30/09    PEARL RIVER PLUMBING HEATING        
                                                            RC-04           2,300                  07/31/07   08/20/07    Milcon Construction                 
                                                            RC-07           2,177                  07/31/07   08/20/07    Milcon Construction                 
 
08-1056   Reconstruction               0-011-013  06/01/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0550   Reconstruction               0-011-014  12/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-PC-01       -3,887                  05/04/10   07/21/10    PEARL RIVER dba BERTUSSI'S          
                                                            CO-RC-01        9,501                  02/09/10   04/30/10    VMG GROUP                           
                                                            CO-RC-02        4,060                  02/09/10   04/30/10    VMG GROUP                           
 
09-1307   Reconstruction               0-011-015  12/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0816   Reconstruction               0-011-017  02/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD04-003            0                  06/10/21   10/21/21    HVS Inc                             
                                                            AD04004             0                  06/10/21   10/21/21    HVS Inc                             
                                                            ADEC4-02            0                  03/25/21   05/25/21    HVS, INC.                           
                                                            ADEC4001            0                  12/22/20   03/12/21    HVS, INC.                           
                                                            ADGC1001            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            ADGC1002            0                  03/04/21   04/29/21    BERTUSSI CONTRACTING, INC.          
                                                            EC-04-01       20,628                  11/18/21   12/15/22    HVS Inc                             
                                                            EC-04-06            0                  09/09/21   11/28/22    HVS, Inc                            
                                                            EC-04-07            0                  09/09/21   11/28/22    HVS, Inc                            
                                                            EC-04-08            0                  09/09/21   11/28/22    HVS, Inc                            
                                                            EC-04-09            0                  09/09/21   11/30/22    HVS, Inc                            
                                                            EC-04-10            0                  09/09/21   11/30/22    HVS, Inc                            
                                                            EC-04-11            0                  11/18/21   12/15/22    HVS Inc                             
                                                            EC-04-14            0                  01/04/22   01/31/23    HVS Inc                             
                                                            EC-04012            0                  11/18/21   12/15/22    HVS Inc                             
                                                            EC-4-05         8,151                  03/04/22   12/06/22    HVS Inc                             
                                                            EC-4-06           856                  03/11/22   02/22/23    HVS Inc                             
                                                            EC4-002         8,994                  01/04/22   01/31/23    HVS Inc                             
                                                            EC4-003         1,918                  01/04/22   01/31/23    HVS Inc                             
                                                            EC4-013             0                  01/04/22   01/31/23    HVS Inc                             
                                                            GC-1-01        20,049                  03/31/22     /  /      Bertussi Contr Inc                  
                                                            GC-1-02        21,630                  03/31/22   03/07/23    Bertussi Contr Inc                  
                                                            GC-1-03        21,315                  03/31/22   03/07/23    Bertussi Contr Inc                  
                                                            GC-1-04        20,775                  03/31/22   03/07/23    Bertussi Contr Inc                  
                                                            PC-03-01       21,096                  08/24/22     /  /      Bertussi Contrs Inc                 
                                                            PC-03-02       15,612                  08/24/22   04/20/23    Bertussi Contr Inc                  
                                                            PC-03-03       11,236                  08/24/22   04/20/23    Bertussi Contrs Inc                 
 
21-1418   Reconstruction               0-011-018  10/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          William St Bldg(Admin)-LsdRockldARC:
95-0846   Reconstruction               1-001-004  05/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0623   Additions and Alterations    1-001-005  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-02          10,153                  05/18/09   09/22/09    PEARL RIVER PLUMB HEAT ELECT        
                                                            RC-02           1,458                  07/31/07   08/20/07    Milcon Construction                 
                                                            RC-05          -1,719                  07/31/07   08/20/07    Milcon Construction                 
 

          Administration Building:
21-1419   Reconstruction               1-017-002  10/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building - Field:
18-1457   New Construction             2-019-001  06/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-010         -2,500                  07/02/20   08/11/20    FANSHAWE, INC.                      
 

          Nauraushaun Bldg - Lsd Out to Privat:
91-0436   Reconstruction               3-004-002  06/22/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1243   Reconstruction               3-004-003  04/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1501   Reconstruction               3-004-005  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0847   Reconstruction               3-004-006  05/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0629   Additions and Alterations    3-004-008  04/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01           3,697                  07/31/07   08/20/07    Milcon Construction                 
                                                            SC-07          11,413                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-08           1,835                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-09           4,480                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-10          32,557                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-11           1,290                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-12           3,284                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-13          12,693                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-15          14,603                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-17          47,024                  04/16/09   07/30/09    W. HARRIS & SON INC                 
                                                            SC-18         -32,000                  04/16/09   07/30/09    W. HARRIS & SON INC                 
 
09-1308   Reconstruction               3-004-009  12/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pearl River Public Library:
21-1798   Reconstruction               6-005-004  05/19/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2200   Reconstruction               6-005-005  06/15/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXHigh School Press Box Demolition:
18-2108   Reconstruction               7-015-003  06/17/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bathroom Building - Field:
18-1458   New Construction             7-020-001  06/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          1,778                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            EC-012        -10,000                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            GC-007         24,934                  07/02/20   08/12/20    BERTUSSI CONTRACTING, INC.          
                                                            GC-008         -9,780                  07/02/20   08/12/20    BERTUSSI CONTRACTING, INC.          
                                                            PC-004        -16,000                  07/02/20   08/11/20    BERTUSSI CONTRACTING, INC.          
 

          Pearl River High School Press Box:
18-1459   New Construction             7-022-001  06/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          1,595                  07/02/20   08/11/20    FANSHAWE, INC.                      
                                                            GC-009         -4,075                  07/02/20   08/12/20    BERTUSSI CONTRACTING, INC.          
 

SUFFERN CSD (FMLY RAMAPO CSD) STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-04-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Suffern Middle School:
90-0693   Reconstruction               0-002-005  01/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0982   Reconstruction               0-002-006  04/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1144   Reconstruction               0-002-007  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1106   Reconstruction               0-002-010  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0578   Reconstruction               0-002-011  12/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1266   Additions and Alterations    0-002-013  07/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            CCD EC-1       -8,628                  02/07/03   06/10/03    All Bright Electric                 
                                                            CCD-1         -15,062                  03/04/03   03/05/03    Fratello Const.                     
                                                            CCD-2             930                  08/15/06   09/29/06    Fratello Construction               
                                                            CCD-CIV1       -5,000                  11/17/05   11/23/05    Hauser Brothers                     
                                                            CCD-GC-3       -8,628                  01/14/03   03/05/03    Fratello Const.                     
                                                            CCD-GC4          -905                  01/14/03   03/05/03    Fratello Const.                     
                                                            CCD-GC5       -12,324                  01/14/03   03/05/03    Fratello Const.                     
                                                            CCD-GC6       -18,000                  01/14/03   03/05/03    Fratello Const.                     
                                                            CCD-HC1        -6,000                  02/06/03   02/13/03    Hauser Bros.                        
                                                            CCD-HC11      -50,000                  11/17/05   11/23/05    Hauser Brothers Inc                 
                                                            CCD-HC2        -8,628                  02/06/03   02/13/03    Hauser Bros.                        
                                                            CCD-PC-1       -8,628                  03/11/03   05/23/03    David L. Kempton                    
                                                            E-1            14,880                  06/21/02   07/12/02    All Bright Electric                 
                                                            E-2            15,482                  06/21/02   07/12/02    All Bright Electric                 
                                                            E-3            -2,843                  06/21/02   07/12/02    All Bright Electric                 
                                                            EC-10          -2,144                  08/15/06   09/29/06    Allbright Electric                  
                                                            EC-11           4,500                  09/09/02   12/09/02    All Bright Electric                 
                                                            EC-12             356                  09/09/02   10/21/02    All Bright Electric                 
                                                            EC-13          10,679                  09/09/02   12/09/02    All Bright Electric                 
                                                            EC-14           4,269                  09/09/02   12/09/02    All Bright Electric                 
                                                            EC-14.1         4,270                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-15          34,514                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-16           4,106                  02/07/03   02/13/03    All Bright Electric                 
                                                            EC-17           6,810                  02/07/03   02/13/03    All Bright Electric                 
                                                            EC-18           2,820                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-19             905                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-20           4,415                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-21           4,600                  02/07/03   02/13/03    All Bright Electric                 
                                                            EC-22          11,000                  02/07/03   02/13/03    All Bright Electric                 
                                                            EC-23           2,945                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-24           9,606                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-25           2,826                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-26          -1,186                  02/07/03   02/13/03    All Bright Electric                 
                                                            EC-27           2,772                  02/06/03   02/13/03    All Bright Electric                 
                                                            EC-28         -65,000                  05/16/03   06/03/03    All Bright Electric                 
                                                            EC-29           8,025                  03/04/03   05/23/03    All Bright Electric                 
                                                            EC-30           5,160                  03/04/03   05/23/03    All Bright Electric                 
                                                            EC-31           2,628                  03/04/03   05/23/03    All Bright Electric                 
                                                            EC-32           3,277                  03/04/03   05/23/03    All Bright Electric                 
                                                            EC-33             569                  03/04/03   05/23/03    All Bright Electric                 
                                                            EC-34           2,900                  03/04/03   05/23/03    All Bright Electric                 
                                                            EC-35         -10,000                  05/16/03     /  /      All Bright Electric                 
                                                            EC-35         -10,000                  11/17/05   11/23/05    Aubright electric                   
                                                            EC-36           2,814                  05/16/03   06/03/03    All Bright Electric                 
                                                            EC-37           1,587                  05/16/03   06/03/03    All Bright Electric                 
                                                            EC-38             998                  05/16/03   06/03/03    All Bright Electric                 
                                                            EC-39           4,500                  05/16/03   06/03/03    All Bright Electric                 
                                                            EC-4              982                  09/09/02   12/09/02    All Bright Electric                 
                                                            EC-40           9,100                  05/16/03   06/03/03    All Bright Electric                 
                                                            EC-41           2,782                  05/27/03   06/10/03    All Bright Electric                 
                                                            EC-42           3,570                  05/27/03   06/10/03    All Bright Electric                 
                                                            EC-43             301                  05/27/03   06/10/03    All Bright Electric                 
                                                            EC-44           1,914                  05/27/03   06/10/03    All Bright Electric                 
                                                            EC-45             646                  05/27/03   06/10/03    All Bright Electric                 
                                                            EC-46           5,000                  05/27/03   06/10/03    All Bright Electric                 
                                                            EC-5            3,650                  09/09/02   12/09/02    All Bright Electric                 
                                                            EC-6            3,386                  09/09/02   12/09/02    All Bright Electric                 
                                                            EC-7           11,900                  09/09/02   12/09/02    All Bright Electric                 
                                                            EC-8           -3,648                  09/09/02   10/21/02    All Bright Electric                 
                                                            EC-9            1,028                  09/09/02   12/09/02    All Bright Electric                 
                                                            GC-10           2,050                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-11           2,875                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-12           2,950                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-13             460                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-14           1,075                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-16           1,300                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-17           6,632                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-18           2,047                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-19          17,475                  01/14/03   02/05/03    Fratello Const.                     
                                                            GC-21             633                  08/15/06   09/29/06    Fratello Construction               
                                                            GC-22          15,000                  08/15/06   09/29/06    Fratello Construction               
                                                            GC-23          12,375                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-25             703                  09/27/02   11/01/02    Fratello Const.                     
                                                            GC-26            -356                  09/27/02   11/01/02    Fratello Const.                     
                                                            GC-27           1,200                  09/27/02   11/01/02    Fratello Const.                     
                                                            GC-28          12,698                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-29           9,905                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-31           2,871                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-32           2,992                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-33           1,316                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-34           9,978                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-35          -2,700                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-36           2,798                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-37           4,340                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-38           2,402                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-39           1,642                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-40           1,988                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-41           1,818                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-42           1,584                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-43           1,429                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-44          11,593                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-45           1,642                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-46           3,402                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-47           2,815                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-48          -1,500                  08/15/06   09/29/06    Fratello Construction               
                                                            GC-50           1,321                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-51          -7,540                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-52           1,276                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-53          -6,546                  01/14/03   01/23/03    Fratello Const.                     
                                                            GC-54            -441                  01/14/03   02/05/03    Thomas Management Services          
                                                            GC-55           3,200                  02/19/03   02/19/03    Fratello Const.                     
                                                            GC-57          14,659                  02/19/03   02/19/03    Fratello Const.                     
                                                            GC-58           1,408                  02/19/03   02/19/03    Fratello Const.                     
                                                            GC-59          28,000                  02/19/03   02/19/03    Fratello Const.                     
                                                            GC-60           7,200                  02/19/03   02/19/03    Fratello Const.                     
                                                            GC-61           6,493                  11/17/05   12/06/05    Fratello Construction               
                                                            GC-62           3,399                  02/19/03   02/19/03    Fratello Const.                     
                                                            GC-63           5,496                  08/15/06   09/29/06    Fratello Construction               
                                                            GC-64          25,176                  03/24/03   03/28/03    Fratello Const.                     
                                                            GC-65        -130,000               3  08/15/06   09/29/06    Fratello Construction               
                                                            GC-66           4,250                  03/04/03   12/06/05    Fratello Const.                     
                                                            GC-66           4,250                  11/17/05     /  /      Fratello Construction               
                                                            GC-67         -19,609                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-68             660                  11/17/05   12/06/05    Fratello Construction Corp          
                                                            GC-69             821                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-7           24,000                  06/17/02     /  /      Fratello Const.                     
                                                            GC-7           24,000                  11/17/05   12/06/05    Fratello Construction               
                                                            GC-70             706                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-71           8,597                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-72           2,076                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-73             786                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-74             877                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-75           2,000                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-76           1,500                  03/04/03   03/19/03    Fratello Const.                     
                                                            GC-77          -1,562                  03/11/03   03/19/03    Fratello Const.                     
                                                            GC-78             854                  03/11/03   03/19/03    Fratello Const.                     
                                                            GC-79           1,300                  03/11/03   03/28/03    Fratello Const.                     
                                                            GC-8            3,000                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-80          -8,628                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-81            -905                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-82         -15,062                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-83         -12,325                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-84         -18,000                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-85           5,496                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-86          -5,496                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-87          -1,500                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-88         -11,900                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-89          35,899                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-9              615                  06/17/02   07/10/02    Fratello Const.                     
                                                            GC-90           7,957                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-91           1,379                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-92          27,267                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-93           4,399                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-94          12,390                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-95           2,240                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-96          37,163                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-97          12,122                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-98          27,130                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC-99          12,122                  09/21/04   10/01/04    Fratello Const.                     
                                                            GC25A          11,385                  08/15/06   09/29/06    Fratello Construction               
                                                            H-1             6,334                  06/17/02   07/10/02    Hauser Bros.                        
                                                            H-2            15,861                  06/17/02   06/30/06    Hauser Bros.                        
                                                            HC-10           5,383                  02/06/03   02/13/03    Fratello Const.                     
                                                            HC-13           2,513                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-14          20,477                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-15           2,505                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-16           3,239                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-17           3,366                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-18           9,368                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-19           6,458                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-20           6,627                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-21           2,929                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-22           8,910                  05/16/03   05/27/03    Hauser Bros.                        
                                                            HC-23           1,583                  12/12/03   01/13/04    Hauser Bros.                        
                                                            HC-24           1,487                  12/12/03   01/13/04    Hauser Bros.                        
                                                            HC-25           5,780                  12/12/03   01/13/04    Hauser Bros.                        
                                                            HC-26           5,943                  12/12/03   01/13/04    Hauser Bros.                        
                                                            HC-3            1,029                  09/09/02   10/21/02    Hauser Bros.                        
                                                            HC-4           -1,145                  09/09/02   12/09/02    Hauser Bros.                        
                                                            HC-5           14,273                  09/09/02   12/09/02    Hauser Bros.                        
                                                            HC-6            3,142                  09/09/02   12/09/02    Hauser Bros.                        
                                                            HC-7            2,671                  09/09/02   12/09/02    Hauser Bros.                        
                                                            HC-8           12,889                  09/09/02   02/13/03    Hauser Bros.                        
                                                            HC-9            3,381                  02/06/03   02/13/03    Hauser Bros.                        
                                                            KE-2             -950                    /  /     12/06/05    BRC COMMERCIAL KITCHENS CORP.       
                                                            KE-3            4,760                  11/17/05   12/06/05    BRC Commercial Kitchens             
                                                            KE1             2,770                  11/20/03   11/24/03    BRC Commercial Kitchens             
                                                            MS-1            2,444                  05/20/02   06/04/02    Fratello Const.                     
                                                            MS-2              958                  05/20/02   06/04/02    Fratello Const.                     
                                                            MS-3            5,964                  05/20/02   06/04/02    Fratello Const.                     
                                                            MS-4            1,567                  05/20/02   06/04/02    Fratello Const.                     
                                                            MS-5           11,860                  05/20/02   06/04/02    Fratello Const.                     
                                                            MS-6            2,018                  05/20/02   06/04/02    Fratello Const.                     
                                                            MS-P1           1,204                  03/11/03   03/19/03    David L.Kempton                     
                                                            PC-10          12,220                  05/16/03   06/03/03    David L.Kempton                     
                                                            PC-2           -5,500                  03/11/03   03/19/03    David L.Kempton                     
                                                            PC-3           -1,710                  03/11/03   03/19/03    David L.Kempton                     
                                                            PC-4           17,600                  03/11/03   03/19/03    David L. Kempton                    
                                                            PC-5            4,350                  03/11/03   03/19/03    David L. Kempton                    
                                                            PC-6            5,091                  03/11/03   03/19/03    David L. Kempton                    
                                                            PC-7            3,766                  03/11/03   03/19/03    David L. Kempton                    
                                                            PC-8            1,254                  03/11/03   03/19/03    David L. Kempton                    
                                                            PC-9          -25,000                  08/15/06   09/29/06    David Kempton                       
 
00-0353   Reconstruction               0-002-014  11/14/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,466                  01/10/02   03/13/02    BML Stage Lighting                  
                                                            2                 936                  02/19/02   03/29/02    BML Stage Lighting                  
 
00-0243   Reconstruction               0-002-015  11/08/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0609   Reconstruction               0-002-016  03/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              3,850                  11/12/02   11/13/02    Profex, Inc.                        
                                                            02                720                  11/12/02   11/13/02    Profex, Inc.                        
 
02-2242   Reconstruction               0-002-017  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1031   Reconstruction               0-002-018  05/20/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          2,254                  10/27/06   12/18/06    Fanshawe                            
                                                            M-001            -510                  05/15/07   08/28/07    Pearl River Plumbing heating        
 
04-0462   Additions and Alterations    0-002-019  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,100                  04/26/10   05/11/10    KOKO CONTRACTING, INC.              
                                                            1              -1,866                  04/16/07   08/28/07    Eagle Electric                      
                                                            1              51,000                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            1             -51,000                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            10              1,200                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            10              1,200                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            11             -8,000                  01/08/08   04/04/08    THE LANDTEK GROUP, INCOPRATED       
                                                            2             180,000                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            2             180,000                  12/19/07   04/03/08    THE LAND TEK GROUP, INC.            
                                                            3              13,500                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            3              13,500                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            4               4,500                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            4               4,500                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            5               6,890                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            5               6,890                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            6               7,500                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            6               7,500                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            7               2,750                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            7               2,750                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            8               4,600                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            8               4,600                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            9               3,200                  12/19/07   04/03/08    THE LANDTEK GROUP,INC               
                                                            9               3,200                  12/19/07   04/03/08    THE LANDTEK GROUP, INC.             
                                                            AACO-006       17,927                  12/24/07   02/23/08    FOUR STRONG BUILDERS, INC           
                                                            AC-002         13,800                  11/25/05   12/06/05    Bojan Development                   
                                                            AC-003          5,800                  11/25/05   12/06/05    bojan Development                   
                                                            AC-004          4,995                  11/25/05   12/06/05    Bojan Development                   
                                                            AC-005          4,200                  11/25/05   12/06/05    Bojan Development                   
                                                            AC-01           4,400                  09/27/05   10/13/05    Bojan Development                   
                                                            EC-003         -1,274                  02/09/07   08/15/07    Fanshawe Inc                        
                                                            EC-004          1,665                  02/08/07   08/15/07    Fanshawe Inc                        
                                                            EC-005          8,500                  02/08/07   08/15/07    Fanshawe Inc                        
                                                            GC-001          6,300                  04/16/08   08/12/08    ADVANCED POLYMER SURFACING          
                                                            GC-015        -68,389                  01/07/08   08/06/08    Aark Contractors                    
                                                            M-002           4,218                  04/20/07   08/15/07    Pearl River  Plumbing               
                                                            MC-013           -187                  10/30/07   08/07/08    Pearl River Plumbing                
 
05-0353   Reconstruction               0-002-020  03/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          6,300                  01/30/08   03/19/08    advanceed polymer sufacing          
                                                            GC-002          4,231                  05/17/07   06/22/07    Lorencin Contracting Corp           
 
07-0156   Reconstruction               0-002-021  09/05/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,440                  04/07/08   04/11/08    EAGLE ELECTRIC                      
                                                            GC-01          -1,300                  06/06/08   08/07/08    Lorencin Contracting corp           
                                                            HVAC -01         -136                  03/20/08   03/28/08    Pearl River Plumbing Heating & Elect
 
07-1441   Reconstruction               0-002-022  07/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -2,500                  04/10/09     /  /      FANSHAWE, INC.                      
                                                            HVAC-01       -30,716                  03/30/09   01/30/12    PEARL RIVER PLUMBING, HEATING & ELEC
                                                            SR-02          -2,500                  03/18/10   06/14/10    SYRACUSE SCENERY & STAGE LIGHTING CO
 
08-1004   Reconstruction               0-002-023  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001          7,114                  08/24/09   09/14/09    MACE CONTRACTING CORPORATION        
                                                            01-005          3,287                  01/12/10   04/02/10    MACE CONTRACTING CORPORATION        
                                                            01-006MS       -5,000                  03/29/10   05/28/10    MACE CONTRACTING CORPORATION        
                                                            06-001          6,705                  11/15/10   11/17/10    NICKERSON CORPORATION               
                                                            06-002        -11,300                  11/15/10   11/17/10    NICKERSON CORPORATION               
                                                            06-004         -1,600                  01/23/12   04/13/12    NICKERSON CORPORATION               
 
10-1150   Reconstruction               0-002-025  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0832   Additions and Alterations    0-002-026  06/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,191                  03/13/13   07/26/13    FANSHAWE INC dba ROCKLAND ELECTRIC  
                                                            EC-02           8,170                  01/21/15   01/26/15    Fanshawe Inc.                       
                                                            GC-01          20,212                  01/23/13   04/15/13    DM RESTORATION INC                  
                                                            GC-02         -21,850                  10/15/13   11/15/13    DM RESTORATION INC                  
                                                            PC-01          22,584                  01/23/13   08/29/13    PEARL RIVER P/H/E INC dba BERTUSSI'S
 
17-1395   Reconstruction               0-002-027  02/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-02          -1,500                  01/08/20   01/29/20    HAUSER BROS.,INC.                   
 
19-0264   Reconstruction               0-002-028  11/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             34,740                  10/14/20   12/21/20    BELLEVILLE LANDSCAPING, INC.        
                                                            01              4,311                  03/03/21   04/20/21    MEHL ELECTRIC CO., INC.             
                                                            02             22,440                  12/09/20   02/24/21    BELLEVILLE LANDSCAPING, INC.        
                                                            02             19,541                  03/03/21   04/20/21    MEHL ELECTRIC CO., INC.             
 
20-0039   Reconstruction               0-002-030  08/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1541   Reconstruction               0-002-031  10/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1554   Reconstruction               0-002-032  06/24/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1310   Reconstruction               0-002-033  05/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,013                  09/19/22   11/13/23    Weatherproofing Tech Inc            
 
22-1643   Reconstruction               0-002-034  07/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0439FP Reconstruction               0-002-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          RP Connor Elementary School:
90-0694   Reconstruction               0-005-004  01/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0983   Reconstruction               0-005-005  04/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1145   Reconstruction               0-005-006  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1392   Reconstruction               0-005-007  06/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1368   Reconstruction               0-005-009  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1108   Reconstruction               0-005-010  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0947   Additions and Alterations    0-005-012  01/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-011        -26,755                  09/18/06   10/19/06    Parsippany Construction             
                                                            CO-GC-95      -15,781                  06/17/10   12/06/10    PARSIPPANY CONSTRUCTION CO INC      
                                                            EC-003        -14,210                  01/13/04   04/08/04    Mehl Elec.                          
                                                            EC-010            692                  01/13/04   02/03/04    Mehl Elec.                          
                                                            EC-026         -6,342                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-042         54,624                  01/14/05   02/01/05    Mehl Electric Company               
                                                            EC-043         12,462                  07/26/05   08/16/05    Mehl Electric Co                    
                                                            EC-074         -2,084                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-075          1,750                  04/15/05     /  /      Mehl Electric Co                    
                                                            EC-075          1,750                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-076            511                  04/15/05   04/26/05    Mehl Electric Co                    
                                                            EC-083            831                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            EC-084            637                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            EC-087          2,186                  10/17/05   05/08/07    Mehl Electric Co                    
                                                            EC-094         22,478                  10/17/05   05/08/07    Mehl Electric Co                    
                                                            EC-097          3,314                  01/09/06   05/08/07    Mehl Electric Co                    
                                                            EC-77           2,933                  04/15/05   04/26/05    Mehl Electric Co                    
                                                            GC-050        -14,040                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-051         -1,600                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-052         -1,386                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-053         -7,616                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-055         -1,000                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-098         22,735                  05/20/10   05/25/10    PARSIPPANY CONSTRUCTION CO INC      
                                                            GC-54          -6,175                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-56            -975                  08/15/05   08/31/05    Parsippany Construction             
                                                            HC-004         -2,091                  01/14/05   02/08/05    Lawton Burns mechanical Contractors 
                                                            HC-009          1,155                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-010          2,265                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-011          5,076                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-032         16,394                  10/17/05   10/25/05    Lawton Burns mechanical             
                                                            HC-036         -7,188                  05/03/11   05/20/11    LAWTON & BURNS MECHANICAL CONTRACTOR
                                                            PC-002         19,920                  01/29/04   03/03/04    Lawton and Burns Mech.              
                                                            PC-003          3,838                  01/29/04   04/13/04    Lawton and Burns Mech.              
                                                            PC-010         53,900                  08/27/04   09/24/04    Lawton and Burns Mech.              
                                                            PC-012         -1,620                  10/05/04   10/18/04    Lawton and Burns Mech.              
                                                            PC-018          6,608                  01/14/05   02/08/05    Lawton Burns Mechanical             
                                                            PC-019         17,506                  06/10/05   07/13/05    Lawton Burns Mechanical             
                                                            PC-029          3,880                  06/10/05   07/13/05    Lawton Burns Mechanical             
                                                            RP-001         36,068                  06/21/04   06/28/04    Parsippany Const.                   
 
02-2243   Reconstruction               0-005-013  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0463   Reconstruction               0-005-014  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            -3,000                  04/26/10   05/11/10    KOKO CONTRACTING, INC.              
                                                            AA-CO001       -3,200                  12/24/07   02/23/08    FOUR STRONG BUILDERS, INC           
                                                            CO-EC-11       -2,500                  03/08/10   02/02/11    FANSHAWE INC dba ROCKLAND ELECTRIC  
                                                            GC-009           -675            -675  07/16/07   01/25/08    AArk Contractors                    
                                                            GC-017         -4,720                  01/07/08   08/06/08    Aark Contractors                    
                                                            GC-01RPC       -3,544                  03/29/10   06/01/10    FIELD PRO ENTERPRISES LLC           
                                                            MC-010        -28,155                  10/30/07   08/07/08    Pearl River Plumbing                
                                                            PC-015           -288                  10/30/07     /  /      Pearl River Plumbing                
 
07-1442   Reconstruction               0-005-015  07/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02             915                  10/29/09   12/24/09    FANSHAWE INC dba ROCKLAND ELECTRIC  
                                                            EC-09            -750                  12/03/09   01/30/12    FANSHAWE, INC. D/B/A ROCKLAND       
                                                            HVAC2RPC      -10,000                  06/24/09   08/14/09    PEARL RIVER d/b/a BERTUSSI'S        
                                                            HVAC7RPC       -2,000                  12/23/09   02/04/10    PEARL RIVER d/b/a BERTUSSI'S        
                                                            PC-03            -833                  12/07/09   02/04/10    JAC MECHANICAL SERVICES,IC          
 
08-1005   Reconstruction               0-005-016  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            05-001         -4,968                  12/21/09   01/12/10    HAYDEN BUILDING MAINTENANCE CORP    
                                                            05-003          2,330                  01/12/10   04/02/10    HAYDEN BUILDING MAINTENANCE CORP    
 
10-1151   Reconstruction               0-005-017  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0265   Additions and Alterations    0-005-018  11/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1542   Reconstruction               0-005-019  10/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1548   Reconstruction               0-005-020  08/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0074   Reconstruction               0-005-021  10/07/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0435FP Reconstruction               0-005-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sloatsburg Elementary:
90-0695   Reconstruction               0-007-006  01/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0984   Reconstruction               0-007-007  04/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1146   Reconstruction               0-007-008  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1109   Reconstruction               0-007-010  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0948   Additions and Alterations    0-007-012  01/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-CO-05       13,246                  12/24/07   02/23/08    FOUR STRONG BUILDERS INC            
                                                            CC-012         -2,819                  09/18/06   10/19/06    Parisippany Construction Co., INc.  
                                                            CO-EC-01       15,300                  08/25/06   05/25/10    ALL BRIGHT ELECTRIC                 
                                                            CO-GC-18      -29,445                  01/07/08   08/06/08    AARK CONTRACTORS INC                
                                                            CO-HC-01         -245                  05/20/10   06/01/10    LAWTON & BURNS MECHANICAL CONTRACTOR
                                                            COGC096          -238                  11/23/05   11/29/05    Parsippany Construction             
                                                            EC-004        -24,230                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-007            688                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-008          5,570                  01/13/04   02/03/04    Mehl Elec.                          
                                                            EC-011            392                  01/13/04   02/03/04    Mehl Elec.                          
                                                            EC-014          2,135                  01/13/04   02/03/04    Mehl Elec.                          
                                                            EC-078         -1,375                  04/15/05     /  /      Mehl Electric Co                    
                                                            EC-078         -1,375                  04/15/05   04/26/05    Mehl Electric Co                    
                                                            EC-079            831                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            GC-002         18,529                  12/22/04   02/01/05    Parsippany Const.                   
                                                            GC-003         13,854                  02/11/05   03/14/05    Parsippany Construction             
                                                            GC-010           -138                  07/16/07   08/07/07    AARK CONTRACTORS INC                
                                                            GC-015          2,948                  06/10/05   07/13/05    parsippany construction             
                                                            GC-016          3,157                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-017         10,245                  06/10/05   07/13/05    Parsippany construction             
                                                            GC-018          2,482                  06/10/05   07/13/05    Parsippany construction             
                                                            GC-019         19,461                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-021          8,175                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-022         -2,016                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-023            650                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-024          8,195                  06/10/05   07/13/05    parsiappany construction            
                                                            GC-025         19,500                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-026          7,400                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-027         -1,000                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-028           -288                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-029         -2,259                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-030         -1,344                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-031         -7,344                  08/02/05   08/16/05    Parsippany Conhstruction            
                                                            GC-032         -1,000                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-033         -8,647                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-034         -1,885                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-035            655                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-036          4,805                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-037            422                  08/02/05   08/15/05    Parsippany Construction             
                                                            GC-038          1,429                  08/02/05   08/15/05    Parsippany Construction             
                                                            GC-039          1,932                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-040          2,135                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-044        -12,000                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-046            476                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-047           -510                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-049          3,434                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-41             450                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-42           1,245                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-43          -4,968                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-45          18,176                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-48          11,650                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC020           5,315                  06/10/05   07/13/05    parsippany construction             
                                                            HC-005          5,877                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-018          6,653                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-019          6,445                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-020            854                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            MC-005         -6,000                  05/15/07   07/17/07    Pearl River Plumbing  Heating       
                                                            PC-013         19,204                  10/05/04   12/10/04    Lawton & Burns Mech.                
 
02-2244   Reconstruction               0-007-013  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0464   Reconstruction               0-007-014  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005            -5,100                  04/26/10   05/11/10    KOKO CONTRACTING, INC.              
                                                            CO-01-SL       -3,544                  03/29/10   06/01/10    FIELD PRO ENTERPRISES LLC           
                                                            EC-008         -1,245                  01/07/08     /  /      Fanshawe Inc                        
                                                            MC-015           -798                  10/30/07   08/07/08    Pearl River Plumbing                
                                                            PC-016              0                  10/30/07   01/16/08    Pearl River Plumbing                
 
07-1443   Reconstruction               0-007-015  07/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           1,687                  10/29/09   12/24/09    FANSHAWE INC dba ROCKLAND ELECTRIC  
                                                            EC-08            -750                  12/03/09   01/30/12    FANSHAWE, INC. D/B/A ROCKLAND       
                                                            HVAC-03         3,011                  07/13/09   08/10/09    PEARL RIVER PLUMBING, HEATING       
                                                            HVAC-04       -12,969                  08/24/09   09/14/09    PEARL RIVER d/b/a BERTUSSI'S        
                                                            HVAC-05          -344                  08/14/09   01/30/12    PEARL RIVER d/b/a BERTUSSI'S        
                                                            HVAC-06         1,659                  12/23/09   02/04/10    PEARL RIVER dba BERTUSSI'S          
                                                            HVAC02SL      -10,000                  06/24/09   08/14/09    PEARL RIVER d/b/a BERTUSSI'S        
                                                            HVAC07SL        5,000                  12/23/09   02/04/10    PEARL RIVER d/b/a BERTUSSI'S        
                                                            PC-01             912                  10/23/09   10/28/09    JAC MECHANICAL SERVICES, INC.       
                                                            PC-02            -833                  12/07/09   02/04/10    JAC MECHANICAL SERVICES,INC         
 
08-1006   Reconstruction               0-007-016  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-001          7,451                  12/07/09   02/05/10    PEARL RIVER PLUMBING                
                                                            05-002         23,800                  07/16/10   09/07/10    HAYDEN BUILDING MAINTENANCE CORP    
                                                            05-004        -17,231                  11/08/10   11/12/10    HAYDEN BUILDING MAINTENANCE CORP    
 
10-0633   Reconstruction               0-007-017  01/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          19,403                  08/15/11   08/26/11    LORENCIN CONTRACTING CORP           
                                                            GC-02          -4,900                  10/12/11   12/06/11    LORENCIN CONTRACTING CORP           
                                                            GC-03           3,256                  10/12/11   12/28/11    LOURENCIN CONTRACTING CORP          
 
10-1152   Reconstruction               0-007-018  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0573   Reconstruction               0-007-019  06/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            -15,000                  12/12/19   12/31/19    HUSH MAINTENANCE CORP.              
 
20-1543   Reconstruction               0-007-020  10/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1549   Reconstruction               0-007-021  08/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1555   Reconstruction               0-007-022  06/24/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0437FP Reconstruction               0-007-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cherry Lane Elementary:
90-0696   Reconstruction               0-011-004  01/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0985   Reconstruction               0-011-006  04/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0504   Reconstruction               0-011-007  01/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1107   Reconstruction               0-011-008  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0019   Reconstruction               0-011-009  07/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0001   Reconstruction               0-011-012  07/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0949   Additions and Alterations    0-011-013  01/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -6,000                  04/26/10   05/11/10    KOKO CONTRACTING, INC.              
                                                            AA-CO-04       -9,297                  12/24/07   01/07/08    FOUR STRONG BUILDERS INC            
                                                            CC-009        -20,000                  09/18/06   10/19/06    Parsippany Construction             
                                                            CO-PC-16        1,607                  05/20/10   08/23/10    LAWTON & BURNS MECHANICAL CONTRACTOR
                                                            CO-PC-17        2,650                  05/03/11     /  /      LAWTON & BURNS MECHANICAL CONTRACTOR
                                                            EC-001        -34,675                  01/13/04   02/03/04    Mehl Elec.                          
                                                            EC-013            251                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-034            880                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-063         -1,830                  04/22/05     /  /      Mehl Electric Co                    
                                                            EC-063         -1,830                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-064          2,333                  04/22/05     /  /      Mehl Electric Co                    
                                                            EC-064          2,333                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-065            544                  04/22/05     /  /      Mehl Electric Co                    
                                                            EC-065            544                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-066          3,063                  04/22/05     /  /      Mehl Electric Co                    
                                                            EC-066          3,063                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-067          2,431                  04/22/05     /  /      Mehl Electric Co                    
                                                            EC-067          2,431                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-068            730                  04/15/05     /  /      Mehl Electric Company               
                                                            EC-068            730                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-069          7,635                  04/15/05   04/26/05    Mehl Electric Co                    
                                                            EC-082          1,436                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            EC-095          1,341                  10/17/05   10/25/05    Mehl Electric Co                    
                                                            GC-079         -2,083                  05/20/10   05/25/10    PARSIPPANY CONSTRUCTION CO INC      
                                                            GC-080           -800                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-081         -2,000                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-082         -2,450                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-083         -1,911                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-086         -1,834                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-088         -1,755                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-089         -1,560                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-84          -1,200                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-85         -13,365                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-87          -1,000                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-93         -68,374                  11/23/05   11/25/05    Parsippany Construction             
                                                            HC-006          9,850                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-024          1,261                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-025         -1,266                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-026            922                  04/20/05   04/26/05    Lawton Burns Mechanical Contractors 
                                                            HC-027          2,576                  04/20/05   04/26/05    Lawton Burns Mechanical Contractors 
                                                            HC-028          1,026                  04/20/05   04/26/05    Lawton Burns Mechanical Contractors 
                                                            HC-035         -5,225                  08/11/10   11/26/10    LAWTON & BURNS MECHANICAL CONTRACTOR
                                                            KC-001           -960                  06/01/05   07/13/05    BRC Commerical Kitchens Corp        
                                                            KC-002          1,908                  06/01/05   07/13/05    BRC Commercial Kitchen Corp         
                                                            M2-001          1,027                  05/15/07   10/22/07    Pearl River Plumbing Heating        
                                                            M2-002              0                  04/24/07   10/22/07    Pearl River Plumbing Heating & Eleac
                                                            PC-011         10,365                  10/05/04   10/18/04    Lawton and Burns Mech.              
                                                            PC-014          9,965                  01/14/05   02/08/05    Lawton Burns Mechanical Contractors 
                                                            PC-030         13,685                  06/10/05   07/13/05    Lawton Burns Mechanical             
 
02-2245   Reconstruction               0-011-014  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0465   Reconstruction               0-011-015  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               4,995                  08/13/08   09/29/08    FIELD PRO ENTERPRISES, LLC          
                                                            CO-01-CL      -10,440                  03/29/10   06/01/10    FIELD PRO ENTERPRISES LLC           
                                                            EC-010         -2,500                  01/07/08   04/09/08    Fanshawe Inc                        
                                                            EC-011         -2,500                  01/07/08   04/09/08    Fanshawe Inc                        
                                                            GC-004         -6,882                  06/04/07   06/18/07    AARk Contractors                    
                                                            GC-007           -657           2,880  07/16/07   01/25/08    AArk Contractors                    
                                                            GC-016         -3,768                  01/07/08   08/06/08    Aark Contractors                    
                                                            GC-021           -904                  03/17/08   04/01/08    AARK CONTRACTORS, INC.              
                                                            MC-001         49,992                  09/11/06   04/11/07    Bertussi Plumbing                   
                                                            MC-009            563                  10/30/07   01/16/08    Pearl River Plumbing                
                                                            PC-003          3,067                  12/19/06   04/11/07    Pearl River Plumbing                
                                                            PC-020           -922                  01/22/08   08/04/08    PEARLRIVER PLUMBING HEATING&ELECTRIC
                                                            Pc-001            893                  12/19/06   01/24/07    Pearl River Plumbing                
                                                            Pc-002          1,103                  12/19/06   01/24/07    Pearl River Plumbing                
 
07-1444   Reconstruction               0-011-016  07/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-05             557                  12/03/09   03/19/10    FANSHAWE, INC.                      
                                                            EC-06             348                  12/03/09   01/30/12    FANSHAWE, INC. D/B/A ROCKLAND       
                                                            EC-07            -750                  12/03/09   01/30/12    FANSHAWE, INC. D/B/A ROCKLAND       
                                                            EC-07            -750                  03/18/10   06/14/10    FANSHAWE INC dba ROCKLAND ELECTRIC  
                                                            HVAC02CL       -3,000                  06/24/09   08/14/09    PEARL RIVER d/b/a BERTUSSI'S        
                                                            HVAC07CL       -2,000                  12/23/09   02/04/10    PEARL RIVER d/b/a BERTUSSI'S        
 
08-0430   Reconstruction               0-011-017  02/18/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -1,520                  08/14/09   09/03/09    HVS LLC                             
                                                            EC-002          6,490                  10/23/09   10/28/09    HVS, LLC                            
                                                            GC-001         31,690                  12/23/09   02/04/10    DOYLE CONTRACTING INC               
                                                            HVAC-001       -2,515                  08/24/09   09/14/09    PEARL RIVER P/H/E dba BERTUSSI'S    
                                                            HVAC-002       -5,983                  12/23/09   02/04/10    PEARL RIVER P/H/E dba BERTUSSI'S INC
                                                            HVAC-003       -6,016                  12/23/09   02/09/10    PARK RIVER P/H/E dba BERTUSSI'S     
                                                            PC-001           -146                  08/24/09   09/14/09    JAC MECHANICAL SERVICES INC         
                                                            PC-002           -894                  10/23/09   10/28/09    JAC MECHANCIAL SERVICES, INC.       
                                                            PC-003          1,640                  10/29/09   12/24/09    JAC MECHANICAL SERVICES INC         
 
10-1153   Reconstruction               0-011-018  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1544   Reconstruction               0-011-019  10/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1550   Reconstruction               0-011-020  08/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1311   Reconstruction               0-011-021  05/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            -16,150                  11/04/22   11/13/23    PAGE CONTRACTING CORP               
 
02-0434FP Reconstruction               0-011-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Montebello Elementary:
91-0986   Reconstruction               0-019-004  04/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1147   Reconstruction               0-019-005  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0505   Reconstruction               0-019-006  01/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1110   Reconstruction               0-019-007  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0531   Reconstruction               0-019-009  11/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0950   Additions and Alterations    0-019-010  01/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            002            13,055                  10/05/04   10/18/04    Lawton and Burns Mech.              
                                                            Cc-010         -6,012                  09/18/06   10/19/06    Parsippany Construction             
                                                            EC-002        -15,187                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-015         43,247                  04/26/04   05/11/04    Mehl Elec.                          
                                                            EC-017         43,247                  06/23/04   07/27/04    Mehl Elec.                          
                                                            EC-024         -1,619                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-033         -3,553                  01/14/05   02/08/05    Mehl Eletric Ci                     
                                                            EC-057            420                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-058            573                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-059          2,726                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-060          1,660                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-061          5,213                  05/04/05   07/13/05    Mehl Electric Company               
                                                            EC-062          3,378                  04/22/05   07/13/05    Mehl Electric Co                    
                                                            EC-085            815                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            EC-086            831                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            EC-098          4,275                  01/09/06   05/08/07    Mehl Electric Co                    
                                                            EC-099         17,549                  09/25/06   02/21/07    Mehl Electric                       
                                                            EC-16           1,054                  01/13/04   01/26/04    Mehl Elec.                          
                                                            Ec-062          3,378                  05/04/05     /  /      Mehl Electric Co                    
                                                            Ec-093         74,188                  10/17/05   05/08/07    Mehl Electric Co                    
                                                            GC-072         -1,435                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-077         -2,793                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-078         -1,995                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-73         -47,821                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-74             600                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-75          -1,000                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            GC-76            -288                  08/15/05   08/31/05    Parsippany Construction             
                                                            GC-79          -2,083                  08/15/05   08/31/05    Parsippany Construction Co          
                                                            Gc-094        -16,623                  11/23/05   11/25/05    Parsippany Construction             
                                                            HC-007         14,100                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-029          3,370                  04/20/05   04/26/05    Lawton Burns Mechanical Contractors 
                                                            HC-030            485                  04/20/05   04/26/05    Lawton Burns Mechanical Contractors 
                                                            HC-033         15,336                  10/17/05   05/08/07    Lawton Burns Mechanical Contractors 
                                                            HC-034          2,420                  09/25/06   02/21/07    Lawton Burns Mechanical             
                                                            PC-001            850                  01/29/04   03/03/04    Lawton and Burns Mech.              
                                                            PC-015          8,388                  01/14/05   02/08/05    Lawton Burns Mechanical Contractors 
                                                            PC-026            816                  06/10/05   07/13/05    Lawton Burns Mechanical             
 
02-2246   Reconstruction               0-019-011  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0466   Reconstruction               0-019-012  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            004           -12,600                  04/26/10   05/11/10    KOKO CONTRACTING, INC.              
                                                            AACO 003        7,900                  12/24/07   02/23/08    FOUR STRONG BUILDERS INC            
                                                            CO-PC021        2,090                  06/06/08   03/06/09    pearl River Plumbingheating&Electric
                                                            EC-007          2,692                  01/07/08   10/07/08    FANSHAWE, INC dba ROCKLAND ELECTRIC 
                                                            GC-003          1,690                  06/04/07   06/18/07    AArk Contractors                    
                                                            GC-008          9,922           9,922  07/16/07   01/25/08    AArk Contractors                    
                                                            GC-019           -858                  01/07/08   08/06/08    Aark Contractors                    
                                                            GC-20          -8,000                  03/17/08   03/16/10    Aark Contractors, Inc.              
                                                            MC-002         22,353                  02/16/07   08/06/10    Bertussi Plumbing                   
                                                            MC-003            881                  02/16/07   08/15/07    Bertussi Plumbing                   
                                                            MC-004          2,387                  02/16/07   08/15/07    Bertussi Plumbing                   
                                                            MC-011          4,121                  01/30/08   08/04/08    pearl river plumbing & heating      
                                                            PC-006          1,104                  12/19/06   01/24/07    Pearl River                         
                                                            PC-007            904                  12/19/06   01/24/07    Pearl River                         
                                                            PC-008          1,981                  12/19/06   01/24/07    Pearl River Plumbing                
                                                            Pc-005          1,832                  12/19/06   01/30/07    Pearl River Plumbing                
                                                            pc-019            125                  01/22/08   08/04/08    PEARLRIVER PLUMBING HEATING&ELECTRIC
 
10-1154   Reconstruction               0-019-014  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1545   Reconstruction               0-019-015  10/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1551   Reconstruction               0-019-016  08/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0436FP Reconstruction               0-019-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Suffern High School:
90-0697   Reconstruction               0-020-007  01/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0987   Reconstruction               0-020-008  04/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1148   Reconstruction               0-020-009  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1393   Reconstruction               0-020-010  06/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1369   Reconstruction               0-020-011  05/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1104   Reconstruction               0-020-012  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0519   Reconstruction               0-020-013  12/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0532   Reconstruction               0-020-015  11/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0951   Additions and Alterations    0-020-016  01/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001           -38,128                  08/23/10   11/26/10    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            CC-004         42,623                  01/09/06   06/26/06    Parsippany Construction Co          
                                                            CC-007         -4,787                  02/22/06   07/21/06    Parsippany Construction             
                                                            CC-008         -7,256                  07/27/06   08/10/06    Parsippany Construction             
                                                            CC-013           -905                  09/18/06   10/19/06    Parsippany Construction             
                                                            CO-CC-05       11,332                  05/20/10   08/23/10    PARSIPPANY CONSTRUCTION CO INC      
                                                            EC-005        -48,122                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-009          1,119                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-015          1,489                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-018         23,538                  06/23/04   07/27/04    Mehl Elec.                          
                                                            EC-019            963                  08/27/04   09/24/04    Mehl Elec.                          
                                                            EC-020          5,418                  08/27/04   09/24/04    Mehl Elec.                          
                                                            EC-021         17,134                  08/27/04   09/24/04    Mehl Elec.                          
                                                            EC-022          2,039                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-025          1,552                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-027          2,359                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-028          4,674                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-029          4,457                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-030          8,233                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-035          7,457                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-036          4,722                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-037          2,202                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-038          1,974                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-039          1,878                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-040        104,393                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-041         31,252                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-044          4,739                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-046         12,837                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-047          7,398                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-048          2,866                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-049          1,032                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-050          6,926                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-051          4,201                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-052            768                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-053          4,175                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-054          1,408                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-055          3,468                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-056          9,736                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-081          1,299                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            EC-089          2,843                  10/17/05   10/25/05    Mehl Electric Co                    
                                                            EC-090          2,362                  10/17/05   10/25/05    Mehl Electric Co                    
                                                            EC-091          1,024                  10/17/05   05/08/07    Mehl Electric Co                    
                                                            EC-096          5,444                  01/09/06   05/08/07    Mehl Electric Co                    
                                                            EC-099         17,549                  05/20/10   05/25/10    MEHL ELECTRIC COMPANY INC           
                                                            EC-32           3,397                  01/14/05   02/08/05    Mehl Electric Co                    
                                                            EC-45           1,968                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-92          36,157                  10/17/05   05/08/07    Mehl Elecric Co                     
                                                            Ec-049          1,032                  04/22/05     /  /      Mehl Electric Co                    
                                                            GC-001        -36,504                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-002           -620                  06/10/05   07/13/05    Parsippany  Construction            
                                                            GC-003        -12,000                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-004         -7,208                  06/10/05   07/13/05    Parsippany construction             
                                                            GC-005         -1,247                  06/10/05   07/13/05    Parsippany construction             
                                                            GC-006        -17,557                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-007         -9,405                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-008         -6,034                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-009         -2,000                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-010           -312                  06/10/05   07/13/05    Parsippany Construction             
                                                            GC-011         -1,000                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-012        -10,000                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-013         -6,500                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-014         -1,400                  06/10/05   07/13/05    parsippany Construction             
                                                            GC-090          8,612                  11/23/05   02/14/06    Parsippany Construction Co          
                                                            GC-91           5,220                  11/23/05   05/08/07    Parsippany Construction             
                                                            GC-92          -2,859                  01/09/06   06/26/06    Parsippany Construction Co          
                                                            HC-008         34,800                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-012          5,280                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-013         12,936                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-014          3,612                  04/20/05   04/26/05    Lawton Burns Mechanical Contractors 
                                                            HC-015          2,874                  05/20/10   05/25/10    LAWTON & BURNS MECHANICAL CONTRACTOR
                                                            HC-016            687                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-017          7,974                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-031         56,877                  04/20/05   04/26/05    Lawton Burns Mechanical Contractors 
                                                            M-001          -1,102                  05/15/07   10/22/07    Pearl River Plumbing Heating        
                                                            PC-007            448                  01/29/04   03/03/04    Lawton and Burns Mech.              
                                                            PC-008        -15,250                  01/29/04   03/12/04    Lawton and Burns Mech.              
                                                            PC-009            821                  01/29/04   03/03/04    Lawton and Burns Mech.              
                                                            PC-020         -1,820                  06/10/05   07/13/05    Lawton Burns Mechanical             
                                                            PC-021            498                  06/10/05   07/13/05    lawton Burns Mechanical             
                                                            PC-022          1,523                  06/10/05   07/13/05    Lawton Burns mechanical             
                                                            PC-023          3,854                  06/10/05   07/13/05    Lawton Burns Mechanical             
                                                            PC-024          3,144                  06/10/05   07/13/05    Lawton Burns Mechanical             
                                                            PC-025            937                  06/10/05   07/13/05    lawton Burns Mechanical             
                                                            cc-06           3,406                  02/22/06   07/21/06    Parsippany Construction             
 
98-1689   Reconstruction               0-020-017  07/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1087   Reconstruction               0-020-018  04/28/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0496   Reconstruction               0-020-019  03/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M-01           11,432                  05/09/02   05/14/02    Joe Lombardo Plumbing               
 
00-0352   Reconstruction               0-020-020  11/14/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 850                  12/27/01   02/28/02    CES Corp.                           
                                                            1                 788                  01/10/02   03/13/02    BML Stage Lighting                  
                                                            2                 495                  12/27/01   02/28/02    CES Corp.                           
                                                            2               7,245                  05/17/02   05/17/02    BML Stage Lighting                  
                                                            3                 901                  03/22/02   04/12/02    BML Stage Lighting                  
 
01-0831   Reconstruction               0-020-021  05/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -3,096                  05/19/03   06/02/03    Empire Energy                       
                                                            S-01           21,950                  01/24/03   01/28/03    Opti-Gro Division                   
                                                            S-02            1,350                  04/17/03   05/07/03    Opti-Gro Division                   
 
03-0211   Reconstruction               0-020-022  02/18/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             21,232                  12/06/04   01/03/05    Jones Turf Management               
                                                            RC-001         67,325          67,325  11/17/05   Disapproved DME Construction Associates         
 
04-0467   Additions and Alterations    0-020-023  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             1,200                  04/26/10   05/11/10    KOKO CONTRACTING, INC.              
                                                            AA-008          2,200                  04/26/10   05/18/10    FOUR STING BUILDERS, INC.           
                                                            AACO-007       12,333                  12/24/07   02/23/08    FOUR STRONG BUILDERS, INC           
                                                            CO-01          -5,000                  03/29/10   06/01/10    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            CO-EC-01        5,792                  02/08/07   07/20/10    FANSHAWE INC dba ROCKLAND ELECTRIC  
                                                            EC-001          2,160                  10/27/05   12/07/05    Naber Electric                      
                                                            EC-001          5,792                  02/08/07   08/15/07    Fanshawe                            
                                                            EC-002         14,451                  10/18/06   04/23/07    naber Electric                      
                                                            EC-002          1,635                  02/08/07   08/22/07    Fanshawe Inc                        
                                                            EC-004          2,024                  10/18/06   12/18/06    Naber Electric                      
                                                            EC-006          4,922                  01/07/07   10/07/08    FANSHAWE,INC. dba ROCKLAND ELECTRIC 
                                                            Ec-003          3,656                  10/18/06   12/18/06    Naber Electric                      
                                                            GC-001         17,660                  12/06/05   08/08/06    Glomar Construction                 
                                                            GC-001             36                  06/04/07   06/18/07    Aark Contractors                    
                                                            GC-002         10,642                  12/06/05   08/08/06    Glomar Construction                 
                                                            GC-002              0                  06/04/07   06/18/07    AARk Contractors                    
                                                            GC-003          3,450                  10/11/06   10/19/06    Glomar Construction                 
                                                            GC-004            -77                  10/27/06   02/21/07    Glomar Construction                 
                                                            GC-006          7,288                  06/04/07   06/18/07    AARk Contractors                    
                                                            GC-011         23,783          23,783  07/16/07   01/25/08    AArk Contractors                    
                                                            GC-014          6,001                  01/07/08   08/06/08    Aark Contractors                    
                                                            MC-005         13,071                  03/15/07   08/06/10    Pearl River                         
                                                            MC-006          4,571                  03/15/07   08/06/10    Pearl River Plumbing                
                                                            MC-007        -14,914                  03/15/07   08/06/10    Pearl River Plumbing                
                                                            MC-008         -2,009                  10/30/07   01/16/08    Pearl River Plumbing                
                                                            MC-012           -711                  10/30/07   01/16/08    Pearl River Plumbing                
                                                            PC-001           -276                  07/26/06     /  /      Norco                               
                                                            PC-002        -15,000                  07/26/06   08/25/06    Norco                               
                                                            PC-004          6,013                  07/26/06   08/25/06    Norco                               
                                                            PC-005          6,218                  07/26/06   08/25/06    Norco                               
                                                            PC-006            956                  07/26/06   08/25/06    Norco                               
                                                            PC-009            673                  12/19/06   01/24/07    Pearl River Plumbing                
                                                            PC-013          1,020                  12/19/06   01/24/07    Pearl River                         
                                                            PC-014          1,353                  12/19/06   01/24/07    Pearl River Plumbing                
                                                            PC-017          3,109                  10/30/07   08/07/08    Pearl River Plumbing                
                                                            PC-11             623                  12/19/06   01/30/07    Pearl River Plumbing                
                                                            Pc-003          9,251                  07/26/06   08/25/06    Norco                               
                                                            Pc-010            716                  12/19/06   01/24/07    Pearl River Plumbing                
                                                            Pc-012            700                  12/19/06   01/24/07    Pearl river Plumbing                
                                                            RC-001         67,325                  03/08/10   05/11/10    DME CONSTRUCTION ASSOCIATES         
                                                            RC-002         15,224                  02/14/06   07/24/06    DME Construction                    
                                                            RC-003         11,930                  02/14/06   07/24/06    DME Construction                    
                                                            RC-004         45,053                  02/12/07   05/16/07    DME Construction                    
                                                            RC-5           15,456                  03/29/10   06/01/10    DME CONSTRUCTION ASSOCIATION INC    
 
05-0354   Reconstruction               0-020-024  03/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC001           2,833                  05/17/07   06/22/07    Lorencin Contracting Corp           
                                                            MC-001          2,526                  03/17/08   03/31/08    PEARL RIVER PLUMBING HEATING & ELECT
 
06-0434   Reconstruction               0-020-025  03/26/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -76,000         -76,000  07/19/07   01/25/08    Lorencin Contracting Corp           
                                                            PLUMB-02       -2,225                  05/19/08   02/24/09    PEARL RIVER PLUMBING                
                                                            Plumb 01       -6,000                  07/19/07   08/28/07    Pearl River Plumbing                
 
07-1445   Reconstruction               0-020-026  07/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SR-01          -2,500                  10/05/09   10/29/09    SYRACUSE SCENERY & STAGE LIGHTING CO
 
08-1007   Reconstruction               0-020-027  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06-003        -10,000                  11/15/10   11/17/10    NICKERSON CORPORATION               
                                                            07-001              0                  11/08/10   11/12/10    NICKERSON CORPORATION               
 
10-1155   Reconstruction               0-020-028  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0833   Additions and Alterations    0-020-029  06/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           2,745                  01/21/15     /  /      Fanshawe Inc.                       
 
16-0836   Reconstruction               0-020-030  06/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FS-01          -1,243                  12/17/18   01/23/19    CHEF'S DEPOT                        
                                                            GC-01         -10,575                  12/17/18   01/23/19    AFL CONSTRUCTION CO., INC.          
 
16-1061   Reconstruction               0-020-031  06/19/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01          42,353                  02/06/19   02/27/19    JOSEPH LOMBARDO P&H                 
                                                            CO-02          -5,424                  02/06/19   02/27/19    JOSEPH LOMBARDO PLUMBING & HEATING  
 
16-2159   Reconstruction               0-020-032  04/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -20,000                  12/18/17   02/13/18    BBR Contracting Corp.               
 
16-2071   Reconstruction               0-020-033  08/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
17-1396   Reconstruction               0-020-034  02/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          -1,500                  01/08/20   01/30/20    HAUSER BROS., INC.                  
 
19-0266   Additions and Alterations    0-020-035  11/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1063   Reconstruction               0-020-036  02/20/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            -20,000                  09/24/19   09/24/19    MILCON CONSTRUCTION CORP.           
 
19-0078   Reconstruction               0-020-037  09/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01           9,626                  01/07/21   03/15/21    S&O CONSTRUCTION SERVICES, INC.     
                                                            MC-02           7,686                  01/07/21   03/15/21    S&O CONSTRUCTION SERVICES, INC.     
                                                            MC-03           7,256                  01/07/21   03/15/21    S&O CONSTRUCTION SERVICES, INC.     
                                                            MC-04          10,956                  01/07/21   03/15/21    S&O CONSTRUCTION SERVICES, INC.     
 
19-1456   Reconstruction               0-020-038  05/20/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1546   Reconstruction               0-020-039  10/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1552   Reconstruction               0-020-040  08/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1644   Reconstruction               0-020-042  07/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0440FP Reconstruction               0-020-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Viola Elementary:
94-0506   Reconstruction               0-026-006  01/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1105   Reconstruction               0-026-007  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0533   Reconstruction               0-026-009  11/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0952   Additions and Alterations    0-026-010  01/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AA-CO-02        2,090                  12/24/07   02/23/08    FOUR STRONG BUILDERS INC            
                                                            CC-014        -10,906                  09/18/06   10/19/06    Parsippany Construction             
                                                            EC-006        -17,072                  01/13/04   02/03/04    Mehl Elec.                          
                                                            EC-012          3,333                  01/13/04   01/26/04    Mehl Elec.                          
                                                            EC-023           -284                  10/18/04   12/21/04    Mehl Elec.                          
                                                            EC-070          7,458                  04/15/05   04/26/05    Mehl Electric Co                    
                                                            EC-071          1,570                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-072          1,409                  05/04/05   07/13/05    Mehl Electric Co                    
                                                            EC-073          1,700                  04/15/05   04/26/05    Mehl Electric                       
                                                            EC-080          1,549                  06/22/05   07/11/05    Mehl Electric Co                    
                                                            EC-088          4,265                  10/17/05   10/25/05    Mehl Electric Co                    
                                                            EC-31          49,328                  10/18/04   12/21/04    Mehl Elec.                          
                                                            FT-001          4,435                  01/05/07   01/19/07    American Petroleum                  
                                                            GC-057         -4,698                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-058         -2,520                  08/02/05   05/08/07    Parsippany Construction             
                                                            GC-059        -54,000                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-060         -8,170                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-061           -500                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-065         -1,246                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-066           -354                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-067           -245                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-069         -1,400                  08/02/05   08/16/05    Parsippany Construction Co          
                                                            GC-071         -1,000                  08/02/05   08/16/05    Parsippany construction             
                                                            GC-097         24,252                  11/23/05   05/08/07    Parsippany Construction Co., Inc.   
                                                            GC-62         -11,080                  08/02/05   05/08/07    Parsippany Construction             
                                                            GC-63          -3,768                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-64          -3,957                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-68            -488                  08/02/05   08/16/05    Parsippany Construction             
                                                            GC-70          -2,346                  08/02/05   08/16/05    Parsippany Construction             
                                                            HC-003         22,664                  10/05/04   10/18/04    Lawton and Burns Mech.              
                                                            HC-021          2,873                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-023          1,664                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            HC-22           1,903                  04/20/05   04/26/05    Lawton Burns Mechanical             
                                                            PC-004          3,463                  01/29/04   03/12/04    Lawton and Burns Mech.              
                                                            PC-005            464                  01/29/04   03/12/04    Lawton and Burns Mech.              
                                                            PC-006          1,703                  01/29/04   03/12/04    Lawton and Burns Mech.              
                                                            PC-027            840                  06/10/05   07/13/05    Lawton Burns Mechanical             
                                                            PC-028            871                  06/10/05   07/13/05    Lawton Burns Mechanical             
 
02-2247   Reconstruction               0-026-011  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0468   Reconstruction               0-026-012  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               5,500                  01/30/08   03/08/08    FIELD PRO ENTERPRISES, LLC          
                                                            CO-01-V        -6,404                  03/29/10   06/01/10    FIELD PRO ENTERPRISES LLC           
                                                            CO-PC022          876                  06/06/08   03/06/09    Pearl RiverPlumbing heating&electric
                                                            EC-009           -423                  01/07/08   08/12/08    FANSHAWE, INC DBA ROCKLAND ELECTRIC 
                                                            GC-005              0                  06/04/07   06/18/07    AARk Contractors                    
                                                            GC-012              0                  08/16/07   08/23/07    Aark Contractors                    
                                                            GC-013         28,114                  01/07/08   03/31/08    AARK CONTRACTORS, INC               
                                                            MC-014         -7,520                  10/30/07   01/16/08    Pearl River Plumbing                
                                                            PC-004            700                  12/19/06   01/24/07    Pearl River Plumbing                
                                                            PC-018         14,597                  01/22/08   08/12/08    PEARL RIVER PLUMBING HEATING & ELEC 
 
07-1446   Reconstruction               0-026-014  07/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04             670                  10/29/09   12/24/09    FANSHAWE INC dba ROCKLAND ELECTRIC  
                                                            EC-10            -750                  12/03/09   01/30/12    FANSHAWE, INC. D/B/A ROCKLAND       
                                                            HVAC-07V       -1,000                  12/23/09   02/04/10    PEARL RIVER d/b/a BERTUSSI'S        
                                                            HVAC02V        -9,042                  06/24/09   08/14/09    PEARL RIVER P/H/E                   
                                                            PC-04            -834                  12/07/09   02/04/10    JAC MECHANICAL SERVICES,INC         
 
10-1156   Reconstruction               0-026-015  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0754   Reconstruction               0-026-016  04/13/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,782                  12/18/17   01/05/18    Tilcon New York, Inc.               
 
17-1276   Reconstruction               0-026-017  06/08/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0267   Additions and Alterations    0-026-018  11/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1547   Reconstruction               0-026-019  10/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1553   Reconstruction               0-026-020  08/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0438FP Reconstruction               0-026-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Airmont Elementary:
92-0161   Reconstruction               0-027-001  08/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0263   Alterations                  0-027-002  10/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          DISTRICTWIDE TECHNOLOGY WIRING:
94-1439   Reconstruction               0-999-001  06/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hillburn Administration Building:
90-0714   Reconstruction               1-006-005  01/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0634   Reconstruction               1-006-008  01/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01          29,102                  10/12/11   12/06/11    BEN CICCONE INC                     
 
10-1157   Reconstruction               1-006-009  08/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1545FA Reconstruction               1-006-011  05/04/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,570                  09/19/22   11/13/23    Weatherproofing Tech Inc            
                                                            2             -13,173                  09/19/22   11/13/23    Weatherproofing Tech Inc            
 

          Salt Storage Shed:
08-1008   New Construction             2-035-001  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            -29,400                  02/11/11   03/01/11    DTM DEVELOPMENT LTD                 
 

          Storage Building:
08-1009   New Construction             2-036-001  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002        -12,857                  08/24/09   09/14/09    MACE CONTRACTING CORPORATION        
                                                            01-003         13,990                  10/23/09     /  /      MACHE CONTRACTING CORPORATION       
                                                            01-004          5,776                  12/21/09   01/12/10    mace contracting corporation        
                                                            01-006SB      -50,000                  03/29/10   05/28/10    MACE CONTRACTING CORPORATION        
                                                            02-001SB         -665                  08/11/10     /  /      PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            03-002         -1,500                  04/26/10   05/11/10    PEARL RIVER PLUMBING HEATING        
                                                            04-001          4,358                  12/21/09   01/12/10    FANSHAWE                            
                                                            04-002          1,136                  12/21/09   01/12/10    FANSHAWE                            
 

          Comfort Station:
06-1248   New Construction             7-032-001  07/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            1,450                  09/05/08   02/27/09    PARKER ELECTRIC, INC.               
                                                            EC-2            2,120                  11/25/08   12/04/08    PARKER ELECTRIC, INC.               
                                                            EC-3            1,985                  11/25/08   12/04/08    PARKER ELECTRIC, INC.               
                                                            GC-1           18,000                  08/22/08   03/17/09    TURCO GOLF, INC.                    
                                                            PC-1           -1,400                  09/23/08   10/30/08    JAC MECHANCIAL SERVICE              
 

          Press Box:
08-1010   New Construction             7-034-001  05/13/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-006PB      -20,000                  03/29/10   05/28/10    MACE CONTRACTING CORPORATION        
                                                            02-001         -1,000                  02/12/10   05/11/10    PEARL RIVER PLUMBING HEATING & ELECT
                                                            02-001PB         -335                  08/11/10   09/28/10    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            04-003         -2,926                  01/25/10   09/30/11    FANSHAWE INC dba ROCKLAND ELECTRIC  
 

          District-Wide:
99-1658   Reconstruction               7-999-002  06/12/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1721   Reconstruction               7-999-003  04/24/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             8,633                  03/30/09   04/23/09    SECUIRTY INTEGRATIONS, INC.         
 

EAST RAMAPO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-04-02-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Spring Valley Senior High:
91-0237   Reconstruction               0-003-001  09/30/91  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-001          11,509                  01/17/18     /  /      UNITED ROOFING AND SHEET METAL      
 
91-0217   Reconstruction               0-003-002  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1248   Reconstruction               0-003-004  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1206   Reconstruction               0-003-005  04/10/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0972   Reconstruction               0-003-006  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0705   Reconstruction               0-003-007  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0394   Reconstruction               0-003-008  02/15/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,946                  03/22/02   04/18/02    Fanshawe Electric                   
 
98-1292   Reconstruction               0-003-009  04/26/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1                -974                  09/20/04   12/04/06    New York Power Aurthority           
 
99-1232   Reconstruction               0-003-011  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0623   Reconstruction               0-003-012  11/28/12  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0899   Reconstruction               0-003-013  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0368   Reconstruction               0-003-014  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1368   Reconstruction               0-003-015  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0419   Reconstruction               0-003-016  10/06/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0965   Reconstruction               0-003-017  05/01/09  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1844   Reconstruction               0-003-019  06/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SMAC-001      -16,500                  06/04/19   07/02/19    SMAC CORP.                          
                                                            SubRest1      -18,000                  02/01/18   02/21/18    Suburban Restoration Co, Inc.       
 
16-1339   Reconstruction               0-003-021  03/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -11,509                  02/01/18   03/08/18    United Roofing & Sheet Metal Inc.   
                                                            BERT-001       12,373                  03/26/19   03/26/19    PEARL RIVER PLUMBING,HEATING & ELECT
                                                            CO-1            4,879                  09/11/18   09/20/18    FANSHAWE INC. D/B/A/ ROCKLAND ELECTR
 
17-1037   Reconstruction               0-003-022  04/05/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2312FA Reconstruction               0-003-025  07/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1862FA Reconstruction               0-003-026  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1030FA Reconstruction               0-003-027  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2058   Reconstruction               0-003-028  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1574FP Reconstruction               0-003-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXAdmin. Bldg. Use 1-005(fmly S.Madi:
91-0218   Reconstruction               0-005-001  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0238   Reconstruction               0-005-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0973   Reconstruction               0-005-004  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0706   Reconstruction               0-005-005  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0167   Reconstruction               0-005-006  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0369   Reconstruction               0-005-010  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1565FP Reconstruction               0-005-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hempstead School:
91-0239   Reconstruction               0-006-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0219   Reconstruction               0-006-002  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1249   Reconstruction               0-006-003  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1171   Reconstruction               0-006-004  05/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0974   Reconstruction               0-006-006  03/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,500                  12/31/01   02/28/02    All Bright Elec.                    
                                                            1             -17,000                  02/20/02   04/05/02    Netrix, Inc                         
                                                            1              -2,400                  12/19/02   02/18/03    Arbe Contracting                    
 
03-0168   Reconstruction               0-006-008  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1369   Reconstruction               0-006-009  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1202   Reconstruction               0-006-010  04/26/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0370   Reconstruction               0-006-011  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1067   Reconstruction               0-006-016  02/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVS-001        12,090                  06/25/19   06/27/19    HVS,LLC                             
                                                            MENG-001      -10,872                  06/25/19   06/27/19    MENGLER MECHANICAL INC.             
 
17-0782   Reconstruction               0-006-017  02/13/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            UNIT-001      -67,602                  06/25/19   10/03/19    UNITED ROOFING & SHEET METAL. INC.  
 
22-2032FA Reconstruction               0-006-019  06/09/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001HES          9,548                  08/08/23     /  /      MILBURN FLOORING                    
                                                            02-001          9,500                  08/16/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
                                                            02-002         22,849                  08/23/23     /  /      RENU CONTRACTING AND RESTORATION    
 
22-2059   Reconstruction               0-006-020  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2229FA Reconstruction               0-006-021  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0620FA Reconstruction               0-006-022  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1569FP Reconstruction               0-006-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pomona Middle(fmlyPomonaJR):
91-0240   Reconstruction               0-008-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0507   Reconstruction               0-008-004  12/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0962   Reconstruction               0-008-005  03/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1250   Reconstruction               0-008-006  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0707   Reconstruction               0-008-007  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0975   Reconstruction               0-008-008  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0169   Reconstruction               0-008-009  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0900   Reconstruction               0-008-011  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0371   Reconstruction               0-008-013  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0966   Reconstruction               0-008-014  05/01/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1286   Reconstruction               0-008-016  06/17/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1336   Reconstruction               0-008-019  02/24/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1140   Reconstruction               0-008-020  03/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HAUS-001       -8,570                  01/16/20   02/05/20    HAUSER BROS. INC.                   
                                                            HVS-001       -10,000                  12/17/19   12/31/19    HVS, LLC                            
 
22-0027FA Reconstruction               0-008-022  07/06/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-003         44,640                  06/30/23     /  /      RENU CONTRACTING & RESTORATION      
                                                            01-004        -24,874                  09/06/23   01/02/24    RENU CONTRACTING & RESTORATION INC. 
                                                            GC-01-01       15,812                  10/14/22   12/13/23    Renu Contr&Restore Inc              
                                                            GC-01-02       17,952                  10/14/22   12/13/23    Renu Contr&Restore Inc              
 
22-2060   Reconstruction               0-008-023  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2230FA Reconstruction               0-008-024  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0621FA Reconstruction               0-008-025  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1572FP Reconstruction               0-008-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXHillcrest ES (sold 2014):
91-0241   Reconstruction               0-011-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0220   Reconstruction               0-011-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0976   Reconstruction               0-011-005  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2481   Reconstruction               0-011-006  07/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0170   Reconstruction               0-011-007  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0372   Reconstruction               0-011-009  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0901   Reconstruction               0-011-010  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1370   Reconstruction               0-011-011  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0967   Reconstruction               0-011-012  05/01/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Kakiat Elementary:
91-0242   Reconstruction               0-013-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0221   Reconstruction               0-013-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1051   Reconstruction               0-013-004  04/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1416   Reconstruction               0-013-005  06/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1251   Reconstruction               0-013-006  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1172   Reconstruction               0-013-007  05/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0977   Reconstruction               0-013-008  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0708   Reconstruction               0-013-009  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0624   Reconstruction               0-013-010  10/16/12  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0171   Reconstruction               0-013-011  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0902   Reconstruction               0-013-012  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1371   Reconstruction               0-013-013  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0373   Reconstruction               0-013-014  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0087   Reconstruction               0-013-018  08/01/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1891   Reconstruction               0-013-020  06/29/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1714   Reconstruction               0-013-021  01/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MENG-001        7,762                  03/26/19   03/26/19    MENGLER MECHANICAL INC.             
 
17-0120   Reconstruction               0-013-022  08/31/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            15,081                  11/14/18   01/10/19    JOSEPH LOMBARDO PLUMB,HEAT&COOLING  
 
17-1041   Reconstruction               0-013-023  02/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -50,120                  02/20/19   03/12/19    BARRETT ROOFS,INC.                  
                                                            BERT-001      -26,664                  02/20/19   03/12/19    PEARL RIVER                         
                                                            FANS-001      -14,087                  02/20/19   03/01/19    FANSHAWE,INC.                       
                                                            FANS-002       11,662                  09/19/19   09/24/19    ROCKLAND ELECTRIC                   
                                                            NIRA-001       -4,207                  02/20/19   03/12/19    NIRAM,INC.                          
 
17-1858   Reconstruction               0-013-024  05/24/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            J&M-001        11,760                  02/20/19   03/01/19    J&M HEATING AND A/C INC             
                                                            PAN-001        -3,117                  02/20/19   03/01/19    RAY S. PANTEL INC                   
                                                            PANT-002       16,197                  03/26/19   03/26/19    RAY S. PANTEL, INC.                 
                                                            PANT-003        4,857                  12/17/19   12/31/19    RAY S. PANTEL, INC.                 
                                                            VIN-001       -10,886                  02/20/19   03/12/19    VINCO BUILDERS,LLC                  
                                                            VIN-002         2,891                  09/19/19   09/27/19    VINCO BUILDERS, LLC                 
 
22-0028FA Reconstruction               0-013-025  07/06/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002          4,320                  09/06/23     /  /      RENU CONTRACTING AND RESTORATION INC
                                                            GC-001          1,309                  06/09/23     /  /      MILBURN FLOORING                    
                                                            GC-01-01       33,120                  10/14/22   12/13/23    Renu Contr&Restore Inc              
 
22-1863FA Reconstruction               0-013-026  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1031FA Reconstruction               0-013-027  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2061   Reconstruction               0-013-028  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1573FP Reconstruction               0-013-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fleetwood Elementary School:
91-0243   Reconstruction               0-014-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0222   Reconstruction               0-014-002  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0591   Reconstruction               0-014-003  04/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1417   Reconstruction               0-014-004  06/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0508   Reconstruction               0-014-005  12/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1252   Reconstruction               0-014-006  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0709   Reconstruction               0-014-007  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0709   Reconstruction               0-014-008  03/12/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,632                  08/18/03   08/27/03    Best Roofing of NJ                  
 
02-1971   Reconstruction               0-014-009  04/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0172   Reconstruction               0-014-010  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0903   Reconstruction               0-014-011  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0374   Reconstruction               0-014-012  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1372   Reconstruction               0-014-013  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1845   Reconstruction               0-014-016  06/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SMAC-001      -16,500                  06/04/19   07/02/19    SMAC CORP.                          
 
16-1337   Reconstruction               0-014-019  02/24/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001         -15,917                  01/12/18   01/25/18    WB Contracting, Inc.                
                                                            GC01           19,065                  11/29/17   02/14/18    Armor-Tite Construction Corp.       
 
16-1892   Reconstruction               0-014-020  06/29/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1068   Reconstruction               0-014-021  02/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVS-001        12,090                  06/25/19   06/27/19    HVS,LLC                             
                                                            MENG-001      -10,872                  06/25/19   06/27/19    MENGLER MECHANICAL INC.             
                                                            MENG-003       42,602                  02/04/20   03/03/20    MENGLER MECHANICAL, INC.            
 
18-1073   Reconstruction               0-014-022  03/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2033FA Reconstruction               0-014-023  06/09/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001FWES         9,369                  08/08/23     /  /      MILBURN FLOORING                    
                                                            01-002          4,800                  08/24/23     /  /      MILBURN FLOORING                    
                                                            02-002        115,851                  08/23/23     /  /      RENU CONTRACTING AND RESTORATION    
                                                            GC-02001       11,000                  08/16/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
 
22-2062   Reconstruction               0-014-024  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2231FA Reconstruction               0-014-025  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0622FA Reconstruction               0-014-026  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Summit Park Elementary:
91-0244   Reconstruction               0-015-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0223   Reconstruction               0-015-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1052   Reconstruction               0-015-004  04/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1418   Reconstruction               0-015-005  06/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0341   Reconstruction               0-015-006  11/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1253   Reconstruction               0-015-007  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0710   Reconstruction               0-015-008  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0978   Reconstruction               0-015-009  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0173   Reconstruction               0-015-010  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0904   Reconstruction               0-015-011  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0960   Reconstruction               0-015-012  01/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0375   Reconstruction               0-015-013  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0783   Reconstruction               0-015-016  02/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            UNIT-001      -67,602                  06/25/19   10/03/19    UNITED ROOFING & SHEET METAL INC.   
                                                            UNIT-002       23,509                  03/26/19   04/01/19    UNITED ROOFING & SHEET METAL, INC.  
 
18-1074   Reconstruction               0-015-017  03/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1172   Reconstruction               0-015-018  03/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HAUSER-1      -17,997                  03/09/20   07/02/20    HAUSER BROS.                        
                                                            LOMB-001       24,923                  03/09/20   06/30/20    LOMBARDO PLUMBING AND HEATING OF ROC
 
22-2034FA Reconstruction               0-015-020  06/09/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002          4,800                  08/24/23     /  /      MILBRUN FLOORING                    
                                                            02-001         11,950                  08/16/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
                                                            GC-02         115,851                  08/23/23     /  /      RENU CONTRACTING AND RESTORATION    
                                                            gc-01           9,165                  08/08/23   12/19/23    MILBURN FLOORING                    
 
22-2063   Reconstruction               0-015-021  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2232FA Reconstruction               0-015-022  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0623FA Reconstruction               0-015-023  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Grandview Elementary:
91-0245   Reconstruction               0-016-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0224   Reconstruction               0-016-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1173   Reconstruction               0-016-005  05/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0979   Reconstruction               0-016-006  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0905   Reconstruction               0-016-009  04/06/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -802                  10/12/07   10/23/07    TOTAL PLUMBING CONCEPTS             
 
05-0376   Reconstruction               0-016-010  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0961   Reconstruction               0-016-011  01/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1069   Reconstruction               0-016-014  02/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVS-001        12,090                  06/25/19   06/27/19    HVS,LLC                             
                                                            MENG-001      -10,872                  06/25/19   06/27/19    MENGLER MECHANICAL INC.             
                                                            MENG-002        3,836                  08/21/19   08/23/19    MENGLER MECHANICAL, INC.            
 
17-0771   Reconstruction               0-016-015  02/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BR-001       -140,976                  06/25/19   10/03/19    BARRETT ROOFS, INC.                 
                                                            HVS-001        -7,663                  07/19/19   10/03/19    HVS,LLC                             
                                                            HVS-002        39,985                  09/19/19   09/27/19    HVS, LLC                            
 
22-2035FA Reconstruction               0-016-017  06/09/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001GES          9,372                  08/08/23     /  /      MILBRUN FLOORING                    
                                                            01-002          4,800                  08/24/23     /  /      MILBURN FLOORING                    
                                                            02-001          6,500                  08/16/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
                                                            02-002        115,851                  08/23/23     /  /      RENU CONTRACTING AND RESTORATION    
 
22-2064   Reconstruction               0-016-018  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2233FA Reconstruction               0-016-019  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0624FA Reconstruction               0-016-020  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Margetts Elem:
91-0246   Reconstruction               0-020-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1419   Reconstruction               0-020-003  06/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1254   Reconstruction               0-020-004  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0980   Reconstruction               0-020-005  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0174   Additions and Alterations    0-020-006  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0906   Reconstruction               0-020-007  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1373   Reconstruction               0-020-008  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0377   Reconstruction               0-020-009  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0968   Reconstruction               0-020-010  05/01/09  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1846   Reconstruction               0-020-012  06/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SMAC-001      -16,500                  06/04/19   07/02/19    SMAC CORP.                          
 
17-0772   Reconstruction               0-020-013  02/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BR-001       -140,976                  06/25/19   10/03/19    BARRETT ROOFS, INC.                 
                                                            HVS-001        -7,663                  07/19/19   10/03/19    HVS,LLC                             
                                                            HVS-002        39,985                  09/19/19   09/27/19    HVS, LLC                            
 
22-1864FA Reconstruction               0-020-015  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0029FA Reconstruction               0-020-016  07/06/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002          1,440                  06/14/23     /  /      RENU CONTRACTING & RESTORATION      
                                                            GC-01-01       33,600                  10/14/22   12/13/23    Renu Contr&Restor Inc               
 
22-1032FA Reconstruction               0-020-017  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2065   Reconstruction               0-020-031  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1571FP Reconstruction               0-020-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ramapo Senior High School:
90-1156   Reconstruction               0-022-001  04/15/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0247   Reconstruction               0-022-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0225   Reconstruction               0-022-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1255   Reconstruction               0-022-004  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1174   Reconstruction               0-022-005  05/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0836   Reconstruction               0-022-007  07/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0711   Reconstruction               0-022-008  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0981   Reconstruction               0-022-010  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1233   Reconstruction               0-022-011  05/09/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -11,134                  12/31/01   05/28/02    Enviro Techniques                   
                                                            1             -37,816                  04/09/02   05/06/02    Zugibe Const.                       
                                                            1              -7,000                  05/30/02   06/05/02    Lombardo Plumbing and Heating       
                                                            1              -9,728                  05/30/02   06/05/02    Lombardo Plumbing and Heating       
 
03-0175   Additions and Alterations    0-022-012  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0907   Reconstruction               0-022-013  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0378   Reconstruction               0-022-014  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1374   Reconstruction               0-022-015  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1294   Reconstruction               0-022-018  07/23/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1490   Reconstruction               0-022-019  04/26/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-1         12,296                  12/01/17   12/26/17    W.B. Contracting                    
                                                            P-01            2,104                  11/18/16   06/19/19    Joseph Lombardo Plumbing & Heating  
 
16-1340   Reconstruction               0-022-020  03/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,900                  04/24/18   04/25/18    Fanshawe Inc. d.b.a. Rockland Electr
                                                            BERT-001        6,439                  03/26/19   03/26/19    PEARL RIVER PLUMBING,HEATING,ELECTRI
                                                            E-001           8,000                  01/17/18   01/31/18    HVS,LLC ELECTRICAL & CONSTR         
                                                            HAUSE-01        1,700                  06/20/18   07/31/18    HAUSER BROTHERS                     
 
18-1212   Reconstruction               0-022-021  05/06/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1865FA Reconstruction               0-022-024  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1033FA Reconstruction               0-022-025  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2066   Reconstruction               0-022-026  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1575FP Reconstruction               0-022-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lime Kiln School:
91-0248   Reconstruction               0-027-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0226   Reconstruction               0-027-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1360   Reconstruction               0-027-004  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1420   Reconstruction               0-027-005  06/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1175   Reconstruction               0-027-006  05/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0176   Reconstruction               0-027-009  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0908   Reconstruction               0-027-010  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0379   Reconstruction               0-027-011  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1375   Reconstruction               0-027-012  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1517   Reconstruction               0-027-015  05/15/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MENG-001      -10,000                  08/21/19   08/22/19    MENGLER MECHANICAL, INC.            
 
17-0773   Reconstruction               0-027-016  02/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BR-001       -140,976                  06/25/19   10/03/19    BARRETT ROOFS, INC.                 
                                                            HVS-001        -7,663                  07/19/19   10/03/19    HVS,LLC                             
                                                            HVS-002        39,985                  09/19/19   09/27/19    HVS, LLC                            
 
22-2036FA Reconstruction               0-027-018  06/09/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002          4,800                  08/24/23     /  /      MILBURN FLOORING                    
                                                            02-001         12,200                  08/16/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
                                                            02-002        103,825                  08/23/23     /  /      RENU CONTRACTING AND RESTORATION    
                                                            GC-001         10,035                  08/08/23     /  /      MILBURN FLOORING                    
 
22-2067   Reconstruction               0-027-019  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2234FA Reconstruction               0-027-020  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0625FA Reconstruction               0-027-021  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1570FP Reconstruction               0-027-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elmwood Elementary School:
91-0249   Reconstruction               0-030-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0227   Reconstruction               0-030-002  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0963   Reconstruction               0-030-003  03/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1256   Reconstruction               0-030-004  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0982   Reconstruction               0-030-005  03/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,500                  10/02/01   01/08/02    Ray Tyrrell Paving                  
                                                            4              70,000                  10/12/01   01/08/02    ACL Const.                          
 
03-0177   Reconstruction               0-030-007  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0909   Reconstruction               0-030-008  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0380   Reconstruction               0-030-009  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1376   Reconstruction               0-030-010  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0171   Reconstruction               0-030-012  06/18/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0534   Reconstruction               0-030-013  11/18/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1847   Reconstruction               0-030-014  06/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SMAC-001      -16,500                  06/04/19   07/02/19    SMAC CORP.                          
 
16-1523   Reconstruction               0-030-015  04/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-01           32,000                  02/06/18   04/12/18    Hauser Bros. Inc                    
 
18-1391   Reconstruction               0-030-016  04/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BARRETT1      -22,588                  03/09/20   06/30/20    BARRETT ROOFS, INC.                 
 
22-1866FA Reconstruction               0-030-017  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0030FA Reconstruction               0-030-018  07/06/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-004        -45,384                  09/06/23   01/02/24    RENU CONTRACTING & RESTORATION INC  
                                                            GC-01           2,160                  06/14/23   12/18/23    RENU CONTRACTING CSD                
                                                            GC-01-01        7,054                  10/14/22   12/14/23    Renu Contr&Restore Inc              
                                                            GC-01-02        5,433                  10/14/22   12/18/23    Renu Contr&Restore Inc              
 
22-1034FA Reconstruction               0-030-019  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2068   Reconstruction               0-030-020  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1568FP Reconstruction               0-030-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bluefield Elementary School:
91-0250   Reconstruction               0-033-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0228   Reconstruction               0-033-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Chestnut Ridge Middle(frmlySpring Va:
91-0251   Reconstruction               0-034-003  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0964   Reconstruction               0-034-005  03/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1257   Reconstruction               0-034-006  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1549   Reconstruction               0-034-007  05/28/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1003   Reconstruction               0-034-008  04/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,900                  03/04/02   04/29/02    Best Roofing of NJ                  
 
00-0983   Reconstruction               0-034-009  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0178   Reconstruction               0-034-010  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1234   Reconstruction               0-034-011  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0910   Reconstruction               0-034-014  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1377   Additions and Alterations    0-034-015  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0381   Reconstruction               0-034-016  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1848   Reconstruction               0-034-018  06/22/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1893   Reconstruction               0-034-020  09/28/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1040   Reconstruction               0-034-021  02/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FANS-001      -17,244                  02/20/19   03/01/19    FANSHAWE, INC.                      
                                                            FANS-002          833                  02/04/20   03/03/20    FANSHAWE, INC.                      
                                                            MENG-001        2,090                  03/26/19   03/26/19    MENGLER MECHANICAL, INC.            
                                                            TITE-001       47,190                  02/20/19   03/12/19    ARMOR-TITE CONSTRUCTION CORP.       
 
17-1859   Reconstruction               0-034-022  05/24/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FANS-001        3,826                  02/20/19   03/01/19    FANSHAWE, INC.                      
                                                            SMAC-001       19,238                  02/20/19   03/12/19    SMAC CORP.                          
                                                            SMAC-002        3,005                  11/20/19   01/17/20    SMAC CORP.                          
 
21-1046   Reconstruction               0-034-024  06/30/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2165FA Reconstruction               0-034-025  05/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2069   Reconstruction               0-034-026  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2235FA Reconstruction               0-034-027  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0626FA Reconstruction               0-034-028  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Eldorado Elementary:
91-0252   Reconstruction               0-037-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0229   Reconstruction               0-037-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0965   Reconstruction               0-037-005  03/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1258   Reconstruction               0-037-006  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0712   Reconstruction               0-037-007  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0179   Reconstruction               0-037-009  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0911   Reconstruction               0-037-010  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0382   Reconstruction               0-037-011  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0969   Reconstruction               0-037-013  05/01/09  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1849   Reconstruction               0-037-015  06/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SMAC-001      -16,500                  06/04/19   07/02/19    SMAC CORP.                          
                                                            SMAC-002       20,807                  11/20/19   12/10/19    SMAC CORP.                          
 
16-1518   Reconstruction               0-037-016  05/15/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MENG-001      -10,000                  08/21/19   08/22/19    MENGLER MECHANOICAL, INC.           
 
17-0774   Reconstruction               0-037-017  02/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BR-001       -140,976                  06/25/19   10/03/19    BARRETT ROOFS, INC.                 
                                                            HVS-001        -7,663                  07/19/19   10/03/19    HVS,LLC                             
                                                            HVS-002        39,985                  09/19/19   09/27/19    HVS, LLC                            
 
22-2037FA Reconstruction               0-037-019  06/09/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001EDES        10,637                  08/08/23     /  /      MILBURN FLOORING                    
                                                            01-002          4,800                  08/24/23     /  /      MILBURN FLOORING                    
                                                            02-001         13,400                  08/16/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
                                                            02-002        103,825                  08/23/23     /  /      RENU CONTRACTING AND RESTORATION    
 
22-2070   Reconstruction               0-037-020  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2236FA Reconstruction               0-037-021  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0627FA Reconstruction               0-037-022  12/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1567FP Reconstruction               0-037-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXColton ES (sold 2014):
91-0253   Reconstruction               0-038-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0230   Reconstruction               0-038-003  09/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1259   Reconstruction               0-038-005  05/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0713   Reconstruction               0-038-006  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0984   Reconstruction               0-038-007  03/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0180   Reconstruction               0-038-009  08/11/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0912   Reconstruction               0-038-010  04/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0383   Reconstruction               0-038-011  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1566FP Reconstruction               0-038-FP1  04/04/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Little Red Schoolhouse Museum:
91-0254   Reconstruction               0-048-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Admin Bldg-frmly S.Madison Instr:
15-1850   Reconstruction               1-005-012  06/22/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1338   Reconstruction               1-005-013  02/24/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1724   Reconstruction               1-005-014  03/16/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2250   Reconstruction               1-005-015  11/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2071   Reconstruction               1-005-016  08/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Office:
05-0384   Reconstruction               1-010-003  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Warehouse Bldg.:
97-1787   Reconstruction               2-009-001  08/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0837   Reconstruction               2-009-002  07/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0385   Reconstruction               2-009-004  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0449   Reconstruction               2-009-005  07/03/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bldgs Grounds Bldg 1:
91-0255   Reconstruction               3-002-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1788   Reconstruction               3-002-002  08/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0838   Additions and Alterations    3-002-004  07/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0386   Reconstruction               3-002-007  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0450   Reconstruction               3-002-008  07/03/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bldgs Grounds Bldg 2:
91-0256   Reconstruction               3-004-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Garage:
91-0257   Reconstruction               5-001-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0509   Reconstruction               5-001-003  12/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1789   Reconstruction               5-001-004  08/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0839   Additions and Alterations    5-001-005  07/19/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0387   Reconstruction               5-001-008  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0169   Reconstruction               5-001-011  04/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXFinkelstein Mem Libr-OwnedByLibrar:
98-0548   Reconstruction               6-012-002  02/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1780   Additions and Alterations    6-012-003  05/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Kitchen Bldg 1:
91-0258   Reconstruction               7-017-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1790   Reconstruction               7-017-002  08/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0388   Reconstruction               7-017-003  03/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Kitchen Bldg 2:
97-1791   Reconstruction               7-018-002  08/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Kitchen Bldg 3:
91-0259   Reconstruction               7-019-001  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Kitchen #4:
91-0260   Reconstruction               7-039-002  09/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Central Kitchen:
02-2129   New Construction             7-053-001  09/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPress Box (NOT BUILT-see 7055DB):
07-0383   New Construction             7-054-001  09/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          xxPress Box @ Spr Valley Demolished:
17-1520   Reconstruction               7-055-002  05/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ Spring Valley HS 2:
17-0784   New Construction             7-056-001  03/01/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ Ramapo High School:
17-0785   New Construction             7-057-001  03/01/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand @ Spring Valley HS:
17-0786   Reconstruction               7-058-001  03/01/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FANSH-2         3,523                  02/20/19   03/05/19    FANSHAWE, INC.                      
 

          Concession Stand @ Ramapo HS:
17-0787   Reconstruction               7-059-001  03/01/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FANS-001       22,255                  02/20/19   03/01/19    FANSHAWE,INC.                       
                                                            HAUS-001       -4,286                  02/20/19   03/01/19    HAUSER BROS. INC.                   
 

          District-Wide:
21-1584FA Reconstruction               7-999-005  05/03/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002         17,847                  04/13/23   01/02/24    RENU CONTRACTING RESTORATION        
                                                            01-003         23,939                  06/26/23   12/22/23    RENU CONTRACTING RESTORATION        
                                                            01-003          2,035                  06/28/23   12/29/23    FANSHAWE INC                        
                                                            01-004          2,357                  06/28/23   12/29/23    FANSHAWE INC                        
                                                            01-005          4,497                  06/28/23   12/29/23    FANSHAWE INC                        
                                                            EC-01001       16,099                  11/18/22   10/19/23    FANSHAWE INC, dba ROCKLAND ELECTRIC 
                                                            EC-01002          946                  04/06/23   12/27/23    FANSHAWE INC, DBA ROCKLAND ELECTRIC 
                                                            GC-01001       23,300                  11/22/22   10/19/23    RENU CONTRACTING RESTORATION        
 

EDWIN GOULD ACAD-LAKESIDE RAMAPO UFS STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-04-14-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
97-0100   Reconstruction               0-002-005  08/05/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gymanisum-Social Hall:
96-0072   Reconstruction               0-003-002  07/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1025   Reconstruction               0-003-003  04/16/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          GED Program South Bldg.:
91-0333   Reconstruction               0-004-002  02/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0995   Reconstruction               0-004-003  04/08/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          GED Program North:
91-0728   Reconstruction               0-005-002  02/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Intake Building:
91-0385   Reconstruction               8-007-002  01/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Shrady Cottage:
90-1741   Reconstruction               8-008-003  08/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE

 STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-09-90-14
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          :
03-0249   Reconstruction               0-001-008  09/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-005           2,263                  03/12/05   04/27/05    Amering Johnston Inc                
                                                            H-005           2,263                  04/29/05   06/10/05    Amering and Johnston                
                                                            H-006          15,878                  03/22/05   03/31/05    Amering Johnston                    
                                                            H-007             798                  04/29/05   06/10/05    Amering and Johnston                
                                                            H-008           7,309                  09/07/05   09/15/05    Amering Johnston Inc                
                                                            H-1            17,284                  03/12/04   04/30/04    Amering & Johnston                  
                                                            H-2            17,328                  04/16/04   04/26/04    Amering & Johnston                  
                                                            H-3            35,414                  04/16/04   04/26/04    Amering & Johnston                  
                                                            H-4             5,033                  08/31/04   09/23/04    Amering & Johnston                  
 

BOCES ROCKLAND STATUS REPORT ON CAPITAL PROJECTS
District No.: 50-90-00-00
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Bldg #1,Ctr Of Occ:
99-0801   Reconstruction               0-001-003  04/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1170   Reconstruction               0-001-004  05/20/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          #2 Ctr Of Occ Educ:
99-0802   Reconstruction               0-002-003  04/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1171   Reconstruction               0-002-006  05/20/04  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0149   Reconstruction               0-002-008  12/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          #3 Ctr Of Occ Educ:
99-0803   Reconstruction               0-003-004  04/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1172   Reconstruction               0-003-006  05/20/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           7,777                  04/05/05   04/20/06    Fanshawe Inc                        
                                                            EC-04         -23,500                  10/04/05   10/13/05    Fanshawe Inc                        
                                                            MC-01          18,069                  01/10/06   12/05/06    Platinum Mechanical                 
 
05-0675   Reconstruction               0-003-007  06/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03             890                  11/30/07   01/28/08    Parker Electric, Inc.               
                                                            EC-05           2,320                  11/29/07   01/28/08    Parker Electric, Inc.               
                                                            EC-07           1,200                  11/29/07   01/28/08    Parker Electric, Corp.              
                                                            GC-01           9,565                  03/08/07   08/20/07    Nikko Construction                  
                                                            GC-02          -2,608                  07/31/07   08/20/07    Nikko Construction                  
                                                            GC-03           3,509                  11/30/07   12/27/07    Nikko Construction Corp             
                                                            GC-04            -182                  11/30/07   12/27/07    Nikko Construction Corp             
                                                            PC-01             716                  05/09/08   08/04/08    VARDON, INC.                        
 

          Bldg#6 Ctr Of Occ Ed:
03-1173   Reconstruction               0-006-002  05/20/04  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1812   Reconstruction               0-006-004  07/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jessie J Kaplan #9:
03-1175   Reconstruction               0-010-003  05/20/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-02           8,588                  01/10/06   05/25/06    Platinum Mechanical                 
 
05-0676   Reconstruction               0-010-004  06/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             475                  04/02/07   08/15/07    Richard parker Electrical           
                                                            EC-02             595                  04/02/07   08/15/07    Richard parker Electrical           
                                                            EC-04             310                  11/30/07   01/28/08    Parker Electric, Inc.               
                                                            EC-06           2,475                  11/29/07   01/28/08    Parker Electric, Inc.               
 
08-1580   Additions and Alterations    0-010-005  09/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0748   Reconstruction               0-010-007  07/26/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1550   Additions and Alterations    0-010-008  04/19/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          14,583                  10/09/18   10/26/18    HVS LLC                             
                                                            E-001           3,000                  07/30/19   07/31/19    HUSH MAINTENANCE CORP.              
                                                            E-002          -5,273                  07/30/19   07/31/19    HUSH MAINTENANCE CORP.              
                                                            E-003           9,951                  07/30/19   07/31/19    HUSH MAINTENANCE CORP.              
                                                            E-004           1,276                  07/30/19   07/31/19    HUSH MAINTENANCE CORP.              
                                                            E-005           3,106                  05/15/19   05/16/19    HVS,LLC                             
                                                            E-005           1,268                  02/03/20   02/27/20    HUSH MAINTENANCE CORP.              
                                                            E-006             884                  05/15/19   05/16/19    HVS,LLC                             
                                                            E-006           5,055                  07/03/20   08/11/20    HUSH MAINTENANCE CORP.              
                                                            E-007           1,110                  07/03/20   08/11/20    HUSH MAINTENANCE CORP.              
                                                            G-001         158,000                  07/30/19   07/31/19    ML, INC.                            
                                                            G-002          11,060                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-002           3,352                  07/30/19   07/31/19    ML, INC.                            
                                                            G-003         -66,033                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-003          10,976                  07/30/19   07/31/19    ML, INC.                            
                                                            G-004          -9,498                  10/08/19   10/17/19    ML, INC.                            
                                                            G-005          29,780                  04/20/20   07/22/20    ML, INC.                            
                                                            G-006           1,810                  04/20/20   07/22/20    ML, INC.                            
                                                            G-007        -223,431                  04/20/20   07/22/20    ML, INC.                            
                                                            G-009          20,756                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-010           2,191                  12/21/18   02/12/19    MODULAR SPACE CORP.                 
                                                            G-011          22,404                  12/21/18   02/12/19    MODULAR SPACE CORP.                 
                                                            G-012          -8,000                  05/14/19   06/06/19    MODULAR SPACE CORP.                 
                                                            G-014          11,757                  05/14/19   06/06/19    MODULAR SPACE CORP.                 
                                                            M-001             851                  02/03/20   02/27/20    JOE LOMBARDO PLUMBING,HEATING & COOL
                                                            M-002         -49,495                  05/14/19   05/16/19    JOE LOMBARDO PLUMBING & HEATING OF  
                                                            P-001           2,785                  10/09/18   10/26/18    JOE LOMBARDO PLUMBING & HEATING INC 
                                                            P-001           9,498                  10/08/19   10/17/19    JOE LOMBARDO PLUMBING,HEATING & COOL
 

          Bldg #10 Ctr Of Occ (NOW 1-012):
98-1061   Reconstruction               0-012-002  06/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg:
03-1177   Reconstruction               1-007-005  05/20/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           6,030                  04/05/05   04/26/05    Fanshawe Inc                        
 
14-1551   Additions and Alterations    1-007-007  04/19/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          14,583                  10/09/18   10/26/18    HVS LLC                             
                                                            E-002           1,901                  10/09/18   10/26/18    HVS LLC                             
                                                            E-003          11,814                  10/09/18   10/26/18    HVS LLC                             
                                                            E-004             875                  05/15/19   05/16/19    HVS, LLC                            
                                                            G-003         -66,033                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-004           6,270                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-005          42,586                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-006           9,233                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-007          11,564                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            G-012          -8,000                  05/14/19   06/06/19    MODULAR SPACE CORP.                 
                                                            G-013          25,054                  05/14/19   06/06/19    MODULAR SPACE CORP.                 
                                                            GC-001        505,990                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            GC-008          6,330                  10/09/18   11/09/18    MODULAR SPACE CORP DBA              
                                                            M-001          -2,083                  10/09/18   10/26/18    JOE LOMBARDO PLUMBING & HEATING     
                                                            M-002         -49,495                  05/14/19   05/16/19    JOE LOMBARDO PLUMBING & HEATING OF  
 

          Bldg #7 Admin (now part of 1-007):
03-1178   Reconstruction               1-008-003  05/20/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bldg.10 Conference Center:
03-1176   Reconstruction               1-012-003  05/20/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maint & Equipment #8:
03-1174   Reconstruction               3-014-001  05/20/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bldg #5 BUS GARAGE/WELDNG&MECH INSTR:
97-1458   Reconstruction               5-009-002  05/01/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FT-01         268,542                  07/09/03   07/14/03    Ira Conklin                         
                                                            FT-02          -7,000                  07/09/03   07/14/03    Ira Conklin                         
                                                            FT-03           3,832                  07/09/03   07/14/03    Ira Conklin                         
                                                            FT-04          -3,200                  07/09/03   07/14/03    Ira Conklin                         
                                                            FT-05          22,015                  07/09/03   07/14/03    Ira Conklin                         
 
03-1179   Reconstruction               5-009-003  05/20/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           7,245                  04/05/05   04/26/05    Fanshawe Inc                        
 
15-1076   Reconstruction               5-009-005  07/28/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1000   Reconstruction               5-009-006  06/26/19  NO CHANGE ORDERS ON ELECTRONIC FILE