Change Order Status - Rensselaer


BERLIN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-01-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXStephentown ES (sold 01/2017):
96-0063   Reconstruction               0-005-002  07/24/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0130   Reconstruction               0-005-003  11/15/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
02-2250   Reconstruction               0-005-004  04/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Berlin Elementary:
92-0365   Reconstruction               0-007-001  11/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0058   Reconstruction               0-007-002  08/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0380   Reconstruction               0-007-004  11/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0064   Reconstruction               0-007-005  07/24/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0660   Reconstruction               0-007-006  02/22/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              -2,000                  12/13/01   03/29/02    Rosch Bros.                         
 
02-2251   Reconstruction               0-007-007  04/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1161   Reconstruction               0-007-009  04/29/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              4,713                  01/05/11   01/28/11    MID-STATE INDUSTRIES LTD            
                                                            02              4,600                  01/05/11   01/28/11    MID-STATE INDUSTRIES LTD            
                                                            03              8,750                  01/05/11   01/28/11    MID-STATE INDUSTRIES LTD            
                                                            04                  0                  01/05/11   01/28/11    MID-STATE INDUSTRIES LTD            
 
10-1199   Reconstruction               0-007-010  12/21/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           4,500                  04/30/12   10/05/12    JUPITER ENVIRONMENTAL SERVICES INC  
 
12-0395   Reconstruction               0-007-011  12/14/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            02-01-01      -22,115                  10/22/13   11/15/13    Bunkoff General Contracting         
 
12-1282   Reconstruction               0-007-012  12/04/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-02-002       -2,330                  07/29/14   10/28/14    Bunkoff General Contracting         
                                                            2-02-004         -394                  11/25/14   02/06/15    Bunkoff General Contracting         
                                                            2-02-005         -100                  02/10/15   03/17/15    Bunkoff General Contracting         
                                                            2-02-006      -14,993                  02/19/15   03/17/15    Bunkoff General Contracting         
                                                            2-03-001       48,787                  10/28/14   11/03/14    Crisafulli Bro's Plumbing & Heating 
                                                            2-03-002       32,426                  10/28/14   11/03/14    Crisafulli Bro's Plumbing & Heating 
                                                            2-03-003       10,874                  10/28/14   11/03/14    Crisafulli Bro's Plumbing & Heating 
                                                            2-03-005         -429                  02/10/15   03/17/15    Crisafulli Bro's Plumbing & Heating 
                                                            2-03-006        2,877                  05/18/15   06/10/15    Crisafulli Bros Plumbing & Heating  
                                                            2-03-007          189                  05/18/15   06/10/15    Crisafulli Bros Plumbing & Heating  
                                                            2-03-008        3,551                  05/18/15   06/10/15    Crisafulli Bros Plumbing & Heating  
                                                            2-03-009        2,663                  05/18/15   06/10/15    Crisafulli Bros Plumbing & Heating  
                                                            2-03-010          956                  05/18/15   06/10/15    Crisafulli Bros Plumbing & Heating  
                                                            2-03-011       -5,742                  06/26/15   07/21/15    Crisafulli Bro's Plumbing & Heating 
                                                            2-03-012         -952                  06/26/15   07/21/15    Crisafulli Bro's Plumbing & Heating 
                                                            2-03-013        8,992                  06/26/15   07/21/15    Crisafulli Bro's Plumbing & Heating 
                                                            2-03-014        2,735                  06/26/15   07/21/15    Crisafulli Bro's Plumbing & Heating 
                                                            2-04-001       43,723                  08/28/14   10/02/14    Kasselman Electric Co., Inc.        
                                                            2-04-002       22,827                  08/28/14   10/02/14    Kasselman Electric Co., Inc.        
                                                            2-04-003        3,587                  08/28/14   10/02/14    Kasselman Electric Co., Inc.        
                                                            2-04-004       14,249                  08/28/14   10/02/14    Kasselman Electric Co., Inc.        
                                                            2-04-005         -594                  10/28/14   11/03/14    Kasselman Electric Co., Inc.        
                                                            2-04-006        2,337                  02/10/15   03/17/15    Kasselman Electric Co., Inc.        
                                                            2-04-007      -13,823                  05/18/15   06/10/15    Kasselman Electric Co., Inc.        
                                                            2-04-009          816                  05/18/15   06/10/15    Kasselman Electric Co., Inc.        
                                                            2-05-001          635                  11/25/14   02/06/15    Ackerman Plumbing, Inc.             
                                                            2-05-002          313                  11/25/14   02/06/15    Ackerman Plumbing, Inc.             
                                                            2-05-003          184                  11/25/14   02/06/15    Ackerman Plumbing, Inc.             
                                                            2-05-004        2,866                  02/05/15   02/06/15    Ackerman Plumbing, Inc.             
                                                            2-05-005          481                  02/05/15   02/06/15    Ackerman Plumbing, Inc.             
                                                            2-05-006          481                  02/05/15   02/06/15    Ackerman Plumbing, Inc.             
                                                            2-05-007       -1,500                  02/10/15   03/17/15    Ackerman Plumbing Inc.              
                                                            2-06-001        5,421                  10/28/14   11/03/14    Bunkoff General Contracting         
                                                            2-06-002        9,264                  11/25/14   02/06/15    Bunkoff General Contracting         
                                                            2-06-003        5,718                  11/25/14   02/06/15    Bunkoff General Contracting         
                                                            2-06-004        5,627                  11/25/14   02/06/15    Bunkoff General Contracting         
                                                            2-06-005        4,759                  11/25/14   02/06/15    Bunkoff General Contracting         
                                                            2-06-006        6,213                  11/25/14   02/06/15    Bunkoff General Contracting         
                                                            2-06-007       22,923                  02/05/15   02/06/15    Bunkoff General Contracting         
                                                            2-06-008        4,990                  02/05/15   02/06/15    Bunkoff General Contracting         
                                                            2-06-009         -333                  02/10/15   03/17/15    Bunkoff General Contracting         
                                                            2-06-010       -2,047                  02/19/15   03/17/15    Bunkoff General Contracting         
 
15-1693   Reconstruction               0-007-013  05/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-01          -7,923                  06/02/17   06/23/17    Mid-State Industries, Ltd.          
                                                            03-01            -391                  06/02/17     /  /      TFR Industries, Inc.                
                                                            03-01               0                  06/02/17   06/23/17    TFR Industries, Inc.                
                                                            03-02           2,647                  06/02/17   06/23/17    TFR Industries, Inc.                
                                                            03-02-01            0                  06/02/17   06/23/17    Mid-State Industries, Ltd.          
                                                            03-02-02            0                  06/02/17   06/23/17    Mid-State Industries, Ltd.          
                                                            03-02-03            0                  06/02/17   06/23/17    Mid-State Industries, Ltd.          
                                                            03-02-04            0                  06/02/17   06/23/17    Mid-State Industries, Ltd.          
                                                            04-01          -1,000                  06/02/17   06/23/17    Stilsing Electric                   
 
18-0107   Reconstruction               0-007-014  09/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,664                  06/26/19   10/03/19    J.J. CURRAN & SON, INC.             
                                                            CO-002          1,853                  06/26/19   10/03/19    J.J. CURRAN & SON, INC.             
 
18-1143   Reconstruction               0-007-015  05/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -49,936                  02/26/20   07/02/20    FLEX ELECTRIC, LLC                  
                                                            EC-08          -1,200                  11/25/20   02/05/21    FLEX ELECTRIC, LLC                  
                                                            EC-09          -2,487                  11/25/20   02/05/21    FLEX ELECTRIC, LLC                  
                                                            EC-10          14,786                  03/23/21   05/27/21    FLEX ELECTRIC, LLC                  
                                                            EC-13           1,875                  03/23/21   05/27/21    FLEX ELECTRIC, LLC                  
                                                            GC-01         -60,843                  02/26/20   06/15/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-05         -21,908                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-09         -12,773                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-10         -20,990                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-11          -4,431                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            MC-01          -8,559                  02/26/20   07/02/20    T. MCELLIGOTT, INC.                 
                                                            MC-06          -1,070                  11/25/20   02/05/21    T. MCELLIGOTT, INC.                 
                                                            PC-06          15,171                  03/23/21   05/27/21    TRI-VALLEY PLUMBING AND HEATING,INC.
                                                            PC-07          15,071                  03/23/21   05/27/21    TRI-VALLEY PLUMBING AND HEATING,INC.
 
19-1243   Reconstruction               0-007-016  01/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0947   Reconstruction               0-007-017  03/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          13,132                  09/20/23     /  /      FLEX ELECTRIC                       
                                                            EC-03          33,889                  09/20/23     /  /      FLEX ELECTRIC                       
                                                            EC-04          28,750                  09/20/23     /  /      FLEX ELECTRIC                       
                                                            GC-007          8,407                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-008          3,750                  09/20/23     /  /      BUNKOFF GENERAL CONTRCATORS         
                                                            GC-01          -1,402                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-04          14,498                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-05           6,778                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-09          33,881                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-13           4,795                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            MC-01           7,981                  09/20/23     /  /      T.MCELLIGOTT                        
                                                            PC-01           4,309                  09/20/23     /  /      TRI-VALLEY PLUMBING AND HEATING     
 

          XXGrafton ES (sold 2017):
93-0437   Reconstruction               0-008-001  11/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1067   Reconstruction               0-008-002  06/16/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3-02              355                  12/27/01   02/28/02    Sutton Landscape Solutions          
 
02-2252   Reconstruction               0-008-003  04/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Berlin Middle/High School:
96-0065   Reconstruction               0-009-002  07/24/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1068   Additions and Alterations    0-009-003  06/16/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2253   Reconstruction               0-009-004  04/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0551   Reconstruction               0-009-005  01/02/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             10,450                  06/23/09   08/19/09    HOOSICK VALLEY CONTRACTORS, INC.    
 
12-1116   Reconstruction               0-009-006  05/07/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-01-01      -15,996                  05/06/14   05/30/14    T. McElligott                       
 
12-1283   Reconstruction               0-009-007  12/04/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-02-001           -8                  07/29/14   10/28/14    Bunkoff General Contracting         
                                                            2-02-003       -3,250                  08/28/14   10/02/14    Bunkoff General Contracting         
                                                            2-02-007       -1,677                  02/19/15   03/17/15    Bunkoff General Contracting         
                                                            2-03-004       -1,538                  11/25/14   02/06/15    Crisafulli Bro's Plumbing & Heating 
                                                            2-04-008       -1,161                  05/18/15   06/10/15    Kasselman Electric Co., Inc.        
 
13-0194   Reconstruction               0-009-008  08/29/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1607   Reconstruction               0-009-009  04/27/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1144   Reconstruction               0-009-011  05/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04         -45,662                  02/26/20   07/02/20    FLEX ELECTRIC, LLC                  
                                                            EC-05         -31,300                  02/26/20   07/02/20    FLEX ELECTRIC, LLC                  
                                                            EC-11           2,542                  03/23/21   05/20/21    FLEX ELECTRIC, LLC                  
                                                            GC-02        -243,001                  02/26/20   06/12/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-05         -21,908                  02/26/20   06/12/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-06        -150,845                  02/26/20   06/12/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-07         -58,195                  02/26/20   06/12/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-08         -54,141                  02/26/20   06/12/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-10         -20,990                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-11          -4,431                  12/29/20   03/15/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-12          -1,340                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-15          -4,897                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-16          -3,398                  11/25/20   01/29/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-17         -16,740                  03/23/21   05/11/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-18         -34,766                  03/23/21   05/11/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            MC-02         -62,000                  02/26/20   07/02/20    T. MCELLIGOTT, INC.                 
                                                            MC-03        -140,555                  02/26/20   07/02/20    T. MCELLIGOTT, INC.                 
                                                            MC-07            -360                  11/25/20   02/05/21    T. MCELLIGOTT, INC.                 
                                                            MC-08         -24,220                  11/14/22   07/27/23    T. MCELLIGOTT INC                   
                                                            PC-01         -10,538                  02/26/20   07/02/20    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-04         -30,592                  02/26/20   07/02/20    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-08          -1,095                  03/23/21   05/20/21    TRI-VALLEY PLUMBING AND HEATING,INC.
                                                            SC-02         -13,114                  11/14/22   12/07/23    RIFENBURG CONTRACTING CORP          
                                                            SC-03         -44,981                  11/14/22   12/07/23    RIFENBURG CONTACTING CORP           
 
20-0948   Reconstruction               0-009-012  03/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005            33,641                  09/20/23     /  /      FLEX ELECTRIC                       
                                                            006            23,504                  09/20/23     /  /      FLEX ELECTRIC                       
                                                            EC-01          26,636                  09/20/23     /  /      FLEX ELECTRIC                       
                                                            EC-07           5,397                  09/20/23     /  /      FLEX ELECTRIC                       
                                                            GC-002         33,755                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-003          9,113                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-06          13,056                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-10          -7,000                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-11           7,944                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-12           3,817                  09/20/23     /  /      BUNKOFF GENERAL CONTRCATORS         
                                                            GC-14           7,448                  09/20/23     /  /      BUNOKFF GENERAL CONTRACTORS         
                                                            GC-15          12,546                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-16          -2,247                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-17           7,916                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-18           4,535                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-19            -986                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            GC-21         -55,927                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            MC-002         10,816                  09/20/23     /  /      T.MCELLIGOTT                        
                                                            MC-03          -4,535                  09/20/23     /  /      T.MCELLIGOTT                        
                                                            MC-04         -10,043                  09/20/23     /  /      T.MCELLIGOTT                        
                                                            PC-02           4,723                  09/20/23   12/18/23    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-03           7,822                  09/20/23   12/18/23    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-04           3,104                  09/20/23     /  /      TRI-VALLEY PLUMBING & HEATING       
                                                            PC-05           3,229                  09/20/23     /  /      TRI-VALLEY PLUMBING & HEATING       
 
02-1529FP Reconstruction               0-009-FP1  05/01/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1062SC Visual Structural Inspection 0-009-SC1  03/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage (old- new BG 5-016):
96-0481   Reconstruction               5-001-001  11/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1235   Reconstruction               5-001-003  04/13/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2254   Reconstruction               5-001-004  04/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1145   Reconstruction               5-001-006  05/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02         -56,045                  02/26/20   07/02/20    FLEX ELECTRIC, LLC                  
                                                            EC-03          -1,814                  02/26/20   07/02/20    FLEX ELECTRIC, LLC                  
                                                            GC-04         -88,105                  02/26/20   06/12/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            MC-05         -37,944                  02/26/20   07/02/20    T. MCELLIGOTT, INC.                 
                                                            PC-03         -11,855                  02/26/20   07/02/20    TRI-VALLEY PLUMBING & HEATING, INC. 
 

          Bus Maintenance Facility:
18-1146   New Construction             5-016-001  05/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-06         -16,501                  02/26/20   07/02/20    FLEX ELECTRIC, LLC                  
                                                            EC-07         -14,357                  11/25/20   02/05/21    FLEX ELECTRIC, LLC                  
                                                            EC-12            -360                  03/23/21   05/27/21    FLEX ELECTRIC, LLC                  
                                                            EC-14          -5,000                  11/14/22   07/27/23    FLEX ELECTRIC LLC                   
                                                            GC-03        -232,950                  02/26/20   06/15/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-10         -20,990                  11/25/20   05/07/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-11          -4,431                  11/25/20   05/07/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-13          -2,450                  11/25/20   05/07/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-14          37,469                  11/14/22   12/07/23    HOOSICK VALLEY CONTRACTORS INC      
                                                            MC-04         -34,471                  02/26/20   07/02/20    T.MCELLIGOTT, INC.                  
                                                            PC-02        -166,832                  02/26/20   07/02/20    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-05          -2,369                  11/25/20   02/05/21    TRI-VALLEY PLUMBING & HEATING, INC. 
 
20-0949   Additions and Alterations    5-016-002  03/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            020           -25,000                  09/20/23     /  /      BUNKOFF GENERAL CONTRACTORS         
 

          Temp. Dist. Office Const.Swing Space:
19-1421SS New Construction             8-017-001  04/05/21  NO CHANGE ORDERS ON ELECTRONIC FILE

BRUNSWICK COMMON SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-02-01-08
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          George Washington School:
90-1447   Reconstruction               0-001-004  05/31/91  NO CHANGE ORDERS ON ELECTRONIC FILE

BRUNSWICK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-02-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Tamarac MS/HS High School:
90-1164   Reconstruction               0-003-010  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1165   Additions and Alterations    0-003-011  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1287   Reconstruction               0-003-012  05/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1246   Additions and Alterations    0-003-013  06/07/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0509   Reconstruction               0-003-014  01/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0321   Reconstruction               0-003-015  12/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1470   Reconstruction               0-003-016  08/31/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0068   Additions and Alterations    0-003-018  12/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001           -16,330                  06/26/06   06/27/06    Jupiter Environmental               
                                                            001           116,692                  06/26/06   06/27/06    Henderson Johnson                   
                                                            001            -6,484                  06/26/06   06/27/06    NEP Glass                           
                                                            001            17,728                  06/26/06   06/27/06    Schenectady hardware                
                                                            002           -32,347                  06/26/06   06/27/06    Henderson Johnson                   
                                                            003            -5,046                  06/26/06   06/27/06    Henderson Johnson Co                
                                                            1             -32,235                  06/26/06   06/27/06    Bette Cring Construction            
                                                            1              22,025                  06/26/06   06/27/06    Mazone Plumbing heating             
                                                            1               6,064                  06/26/06   06/27/06    Hudson Valley Communication         
                                                            1               7,447                  06/26/06   06/27/06    Northeastern Interiors              
                                                            2               7,407                  06/26/06   06/27/06    Sunrise Electric                    
                                                            2                 777                  06/26/06   06/27/06    Mazone Plumbing heating             
                                                            2               9,419                  06/26/06   06/27/06    Hudson Valley Communications        
                                                            2               9,103                  06/26/06   06/27/06    Northeastern Interiors              
                                                            3               9,828                  06/26/06   06/27/06    Hudson Valley Communication         
                                                            3               3,712                  06/26/06   06/27/06    Northeastern Interiors              
                                                            4               5,243                  06/26/06   06/27/06    Northeastern Interiors              
 
00-0701   Reconstruction               0-003-019  02/17/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0831   Reconstruction               0-003-020  05/29/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-HS-1        24,884                  06/30/10   08/06/10    LVI ENVIRONMENTAL SERVICES INC      
                                                            01-HS-2             0                  06/30/10   08/06/10    LVI ENVIRONMENTAL SERVICES INC      
                                                            02-1          167,000                  08/25/08   10/07/08    BAST HATFIELD, INC.                 
                                                            02-HS-2        -4,178                  06/30/10   08/06/10    BAST HATFIELD INC                   
                                                            02-HS-3       -14,092                  06/30/10   08/05/10    BAST HATFIELD INC                   
                                                            03-1           11,200                  06/30/10   08/05/10    SCOTT HULL CONSTRUCTION             
                                                            03-HS-2        -9,090                  06/30/10   08/05/10    SCOTT HULL CONSTRUCTION             
                                                            04-HS-1         9,081                  06/30/10   08/05/10    JOHN V WARREN INC                   
                                                            04-HS-2           356                  06/30/10   08/05/10    JOHN V WARREN INC                   
                                                            05-HS-1           339                  06/30/10   08/05/10    COLLETT MECHANICAL                  
                                                            05-HS-2        19,911                  06/30/10   08/19/11    COLLETT MECHANICAL                  
                                                            06-1          -54,100                  08/25/08   10/07/08    CANALE ELECTRIC CORP.               
                                                            06-HS-2         5,485                  06/30/10   08/05/10    CANALE ELECTRIC CORP                
                                                            06-HS-3        -4,200                  06/30/10   08/04/10    CANALE ELECTRIC CORP                
                                                            07-HS-1        -1,605                  06/30/10   08/04/10    ACME STAGE & SPORTS SPECIALTIES INC 
                                                            08-HS-1          -900                  06/30/10   08/04/10    NISTEL LLC                          
                                                            09-HS-1        -4,000                  06/30/10   08/04/10    George J Martin & Son Inc           
 
12-1301   Reconstruction               0-003-021  07/19/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0529   Reconstruction               0-003-022  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -2,152                  05/22/15   06/10/15    Hoosick Valley Contractors, Inc.    
                                                            02            -40,040                  05/22/15   06/10/15    Hoosick Valley Contractors Inc.     
                                                            03            -19,208                  05/22/15   06/10/15    Hoosick Valley Contractors Inc.     
                                                            04              1,882                  10/30/15   12/02/15    Hoosick Valley Contractor, Inc.     
                                                            05              3,196                  10/30/15   12/02/15    Hoosick Valley Contractors, Inc.    
 
16-1302   Reconstruction               0-003-023  03/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -40,606                  06/19/17   07/05/17    DelSignore Blacktop Paving, Inc.    
 
17-0749   Reconstruction               0-003-024  02/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -3,977                  12/27/18   02/01/19    J.MCBAIN INC                        
                                                            GC-001        -10,000                  11/26/19   12/10/19    AJ CATALFAMO CONSTRUCTION           
                                                            SC-01          -5,840                  01/15/20   06/30/20    EVOLUTION CONSTRUCTION SERVICES     
                                                            SC-02            -700                  04/05/19   04/25/19    EVOLUTION CONSTRUCTION SERVICES     
 
17-0737   Additions and Alterations    0-003-025  09/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002         20,000                  10/21/19   10/23/19    FLEX ELECTRIC, LLC                  
                                                            EC-004          1,901                  09/22/20   11/06/20    FLEX ELECTRIC, LLC                  
                                                            EC-005          5,785                  09/22/20   11/06/20    FLEX ELECTRIC, LLC                  
                                                            EC-007          6,304                  10/14/20   12/18/20    FLEX ELECTRIC, LLC                  
                                                            EC-009          1,177                  11/12/20   02/16/21    FLEX ELECTRIC, LLC                  
                                                            EC-01          24,450                  09/03/19   09/04/19    FLEX ELECTRIC LLC                   
                                                            GC-002         23,815                  09/26/19   12/31/19    BAST HATFIELD CONSTRUCTION,LLC      
                                                            GC-003         14,781                  09/15/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-004         16,052                  09/15/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-005         11,402                  09/15/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-006          9,063                  09/15/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-007          7,231                  09/22/20   02/10/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-008         -3,623                  12/11/20   03/10/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-01           3,426                  07/29/19   10/03/19    BAST HATFIELD CONSTRUCTION,LLC      
                                                            MC-001         21,769                  10/14/20   12/18/20    RMB MECHANICAL, INC.                
                                                            MC-002         -1,344                  12/11/20   02/25/21    RMB MECHANICAL, INC.                
                                                            PC-001          4,393                  03/27/20   07/03/20    BURNICHE PIPING, INC.               
                                                            PC-003          1,878                  11/27/20   02/01/21    BURNICHE PIPING, INC.               
 
17-1433   Reconstruction               0-003-026  04/13/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -5,000                  01/22/20   02/25/20    FLEX ELECTRIC LLC                   
 
18-0292   Reconstruction               0-003-027  10/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          -2,987                  07/31/19   08/01/19    T. MCELLIGOTT, INC.                 
 
21-0135   Reconstruction               0-003-028  10/13/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          1,908                  05/02/23   12/28/23    FLEC ELECTRIC                       
                                                            GC-002          6,060                  01/18/23   09/19/23    GALLO CONST CORP                    
                                                            RC-01          71,455                  05/26/22   01/30/23    Progressive Roofing                 
 
02-1167FP Reconstruction               0-003-FP1  02/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Waste Treatment Plant fmly 2-004:
04-0247   Reconstruction               0-004-003  09/28/04  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1496   Reconstruction               0-004-004  06/16/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,340                  03/31/11   04/21/11    CASALE EXCAVATING INC               
 

          Parker ES (sold 2015):
90-1166   Reconstruction               0-006-006  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1288   Reconstruction               0-006-007  05/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0832   Reconstruction               0-006-010  05/29/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-PS-1       -14,769                  06/30/10   08/06/10    BAST HATFIELD INC                   
                                                            02-PS-2       -14,158                  06/30/10   08/06/10    BAST HATFIELD INC                   
                                                            03-1           30,600                  06/30/10   08/06/10    SCOTT HULL CONSTRUCTION             
                                                            03-2           -1,412                  06/30/10   08/06/10    SCOTT HULL CONSTRUCTION             
                                                            04-PS-1        -1,566                  06/30/10   08/06/10    JOHN V WARREN INC                   
                                                            05-1           -5,968                  06/30/10   08/06/10    COLLETT MECHANICAL INC              
                                                            06-PS-1        -8,445                  06/30/10   08/06/10    CANALE ELECTRIC CORP                
                                                            07-PS-1        -1,000                  10/12/10   10/29/10    ACME STAGE & SPORTS SPECIALTIES INC 
                                                            09-PS-1        -1,000                  06/30/10   08/06/10    GEORGE J MARTIN & SON INC           
                                                            P-1             8,280                  06/30/10   08/06/10    LVI ENVIRONMENTAL SERVICES INC      
 

          Tamarac Elementary:
90-1167   Additions and Alterations    0-009-006  03/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1289   Reconstruction               0-009-009  05/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1245   Reconstruction               0-009-010  06/07/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0510   Reconstruction               0-009-011  01/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0322   Reconstruction               0-009-012  12/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0069   Additions and Alterations    0-009-013  12/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -8,859                  06/26/06   06/27/06    Collett mechanical                  
                                                            001            75,050                  06/26/06   06/27/06    Henderson Johnson                   
                                                            001            -2,161                  06/26/06   06/27/06    NEP Glass                           
                                                            001            17,725                  06/26/06   06/27/06    Schenectady hardware                
                                                            1             -28,585               3  06/26/06   06/27/06    Bette Cring Construction            
                                                            1                 932                  06/26/06   06/27/06    Sunrise electric                    
                                                            1              -1,200                  06/26/06   06/27/06    facilities Equipment                
                                                            2               7,407                  06/26/06   06/27/06    Sunrise Electric                    
                                                            3                -790                  06/26/06   06/27/06    Sunrise Electric                    
 
00-0700   Reconstruction               0-009-014  02/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01                  0                  09/09/04   09/17/04    Ray Darling                         
                                                            02            -11,574                  09/09/04   09/17/04    Ray Darling                         
 
06-0833   Reconstruction               0-009-015  05/29/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-E-1         12,504                  06/30/10   08/05/10    LVI ENVIRONMENTAL SERVICES INC      
                                                            02-TE-1        13,863                  06/30/10   08/05/10    BAST HATFIELD INC                   
                                                            02-TE-2        18,336                  06/30/10   08/05/10    BAST HATFIELD INC                   
                                                            03-1          -10,500                  06/30/10   08/05/10    SCOTT HULL CONSTRUCTION             
                                                            04-TE-1         2,769                  06/30/10   08/05/10    JOHN V WARREN INC                   
                                                            05-1           18,950                  06/30/10   08/05/10    COLLETT MECHANICAL INC              
                                                            05-2           12,694                  06/30/10   08/06/10    COLLETT MECHANICAL INC              
                                                            06-TE-1           803                  06/30/10   08/06/10    CANALE ELECTRIC CORP                
                                                            08-TE-1        -1,000                  06/30/10   08/06/10    NISTEL LLC                          
                                                            09-TE-1        -4,000                  06/30/10   08/06/10    GEORGE J MARTIN & SON INC           
 
12-1302   Reconstruction               0-009-016  07/19/13  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0673   Reconstruction               0-009-017  01/29/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0750   Reconstruction               0-009-018  02/06/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0738   Reconstruction               0-009-019  09/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003          3,258                  11/26/19   12/17/19    FLEX ELECTRIC, LLC                  
                                                            EC-006          1,177                  09/28/20   11/06/20    FLEX ELECTRIC, LLC                  
                                                            EC-008          5,314                  11/12/20   02/16/21    FLEX ELECTRIC, LLC                  
                                                            PC-002          4,989                  03/27/20   07/03/20    BURNICHE PIPING, INC.               
 
20-0061   Reconstruction               0-009-020  08/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-001        -19,822                  03/09/21   04/30/21    RMB MECHANICAL, INC.                
                                                            PC-002         -4,064                  05/07/21   08/24/21    RMB MECHANICAL, INC.                
 
21-0136   Reconstruction               0-009-021  10/13/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          3,291                  01/18/23   09/19/23    GALLO CONST CORP                    
                                                            PC-001          9,063                  08/29/23   12/18/23    MAZZONE PLUMBING & HEATING          
 
21-0424   Reconstruction               0-009-022  11/04/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          23,100                  02/24/22   03/27/23    BPI Inc                             
                                                            PC-02          -5,000                  06/17/22   05/04/23    BPI Inc                             
 
02-1168FP Reconstruction               0-009-FP1  02/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stg Facility:
00-0702   Reconstruction               2-004-002  02/17/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXParker Storage Shed (sold):
01-0035   Reconstruction               2-013-001  07/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field Storage Building:
06-0834   New Construction             2-014-001  05/29/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-1           68,000                  08/25/08     /  /      Bast Hatfield, Inc.                 
                                                            06-1            8,000                  08/25/08     /  /      Canale Electric Corp.               
 

          Bus Garage:
91-1290   Reconstruction               5-005-001  05/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0944   Reconstruction               5-005-004  04/27/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0835   Reconstruction               5-005-005  05/29/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-BG-1           906                  06/30/10   08/06/10    BAST HATFIELD INC                   
                                                            04-BG-1         2,522                  06/30/10   08/06/10    JOHN V WARREN INC                   
                                                            05-1          -13,693                  06/30/10   08/06/10    COLLETT MECHANICAL INC              
                                                            05-BG-2        -4,000                  06/30/10   08/06/10    COLLETT MECHANICAL INC              
                                                            06-BG-1        -5,497                  06/30/10   08/06/10    CANALE ELECTRIC CORP                
                                                            09-BG-1        -1,000                  06/30/10   08/06/10    GEORGE J MARTIN & SON INC           
                                                            10-1           17,825                  06/30/10   08/06/10    TOTAL TOOL LTD                      
 
12-1303   Reconstruction               5-005-006  07/19/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0739   Reconstruction               5-005-007  09/06/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0751   Reconstruction               5-005-008  02/06/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Concession Stand:
98-1441   New Construction             7-011-001  08/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          NEW PRESS BOOTH:
99-1625   New Construction             7-012-001  08/11/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,214                  08/27/01   01/09/02    FH Alexander                        
                                                            2               2,400                  08/27/01   01/15/02    FH Alexander                        
 

          District-Wide:
16-0814   Reconstruction               7-999-001  09/25/17  NO CHANGE ORDERS ON ELECTRONIC FILE

EAST GREENBUSH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-03-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Goff Middle School:
91-1448   Reconstruction               0-001-003  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0820   Reconstruction               0-001-004  03/01/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0982   Additions and Alterations    0-001-006  04/30/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-10           2,010                  03/12/02   06/09/04    Zandri Const.                       
                                                            01-11             435                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-12          -6,600                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-13         -16,711                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-14             275                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-15            -500                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-2            4,114                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-3                0                  03/12/02   06/09/04    Zandri Const.                       
                                                            01-4           -5,000                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-5           15,365                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-6             -261                  03/12/02   09/05/03    Zandri Const.                       
                                                            01-7                0                  03/12/02   06/09/04    Zandri Const.                       
                                                            01-8            3,544                  03/12/02   06/09/04    Zandri Const.                       
                                                            01-9            4,130                  03/12/02   06/09/04    Zandri Const.                       
                                                            02-10            -208                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            02-3              650                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            02-4              575                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            02-5              420                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            02-6              425                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            02-7            3,232                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            02-8            2,205                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            02-9            1,000                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
                                                            03-1            5,594                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            03-10             512                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            03-2              245                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            03-3              261                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            03-4             -331                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            03-5              477                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            03-6                0                  03/12/02   06/09/04    Universal Custom Millwork           
                                                            03-7           -1,024                  03/12/02   09/23/03    Universal Custom Millwork           
                                                            03-8              207                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            03-9           -3,267                  03/12/02   09/05/03    Universal Custom Millwork           
                                                            04-1            6,459                  03/12/02   09/05/03    Weather Guard Industries            
                                                            04-2              460                  03/12/02   09/05/03    Weather Guard Industries            
                                                            04-3              560                  03/12/02   09/05/03    Weather Guard Industries            
                                                            04-4           -2,521                  03/12/02   06/02/04    Weather Guard Industries            
                                                            05-1           10,400                  03/12/02   09/05/03    Robinson Hall Architectural         
                                                            05-2              157                  03/12/02   09/05/03    Robinson Hall Architectural         
                                                            05-3              326                  03/12/02   09/05/03    Robinson Hall Architectural         
                                                            05-4           -4,517                  03/12/02   09/05/03    Robinson Hall Architectural         
                                                            07-1            5,433                  03/12/02   09/05/03    John V. Warren                      
                                                            07-2            3,971                  03/12/02   09/05/03    John V. Warren                      
                                                            07-3            2,251                  03/12/02   09/05/03    John V. Warren                      
                                                            07-4            1,270                  03/12/02   09/05/03    John V. Warren                      
                                                            07-5              500                  03/12/02   09/05/03    John V. Warren                      
                                                            07-6            1,513                  03/12/02   06/09/04    John V. Warren                      
                                                            07-7            2,309                  03/12/02   09/05/03    John V. Warren                      
                                                            07-8            1,495                  03/12/02   09/05/03    John V. Warren                      
                                                            07-9            1,024                  03/12/02   09/05/03    John V. Warren                      
                                                            08-1            1,339                  03/12/02   09/05/03    John V. Warren                      
                                                            08-10             285                  03/12/02   09/05/03    John V. Warren                      
                                                            08-11            -425                  03/12/02   06/09/04    John V. Warren                      
                                                            08-2            1,862                  03/12/02   09/05/03    John V. Warren                      
                                                            08-3           12,753                  03/12/02   09/05/03    John V. Warren                      
                                                            08-4              449                  03/12/02   09/05/03    John V. Warren                      
                                                            08-5             -794                  03/12/02   09/05/03    John V. Warren                      
                                                            08-6                0                  03/12/02   06/09/04    John V. Warren                      
                                                            08-7                0                  03/12/02   06/09/04    John V. Warren                      
                                                            08-8                0                  03/12/02   06/09/04    John V. Warren                      
                                                            08-9           -1,000                  03/12/02   09/05/03    John V. Warren                      
                                                            09-10           5,360                  03/12/02   09/05/03    Harold R. Clune                     
                                                            09-11             164                  03/12/02   09/05/03    Harold R. Clune                     
                                                            09-12               0                  03/12/02     /  /      Harold R. Clune                     
                                                            09-13           1,750                  03/12/02   09/05/03    Harold R. Clune                     
                                                            09-14           1,554                  03/12/02   06/09/04    Harold R. Clune                     
                                                            09-3                0                  03/12/02   06/09/04    Harold R. Clune                     
                                                            09-4            2,697                  03/12/02   09/05/03    Harold R. Clune                     
                                                            09-5           20,688                  03/12/02   06/09/04    Harold R. Clune                     
                                                            09-6                0                  03/12/02   06/09/04    Harold R. Clune                     
                                                            09-7           17,742                  03/12/02   09/05/03    Harold R. Clune                     
                                                            09-8              935                  03/12/02   09/05/03    Harold R. Clune                     
                                                            09-9                0                  03/12/02     /  /      Harold R. Clune                     
                                                            1-1            14,884                  03/12/02   09/05/03    Zandri Const.                       
                                                            10-1            4,250                  03/12/02   09/05/03    AAR Contractor                      
                                                            10-2                0                  03/12/02   08/19/03    AAR Contractor                      
                                                            10-3                0                  03/12/02   08/19/03    AAR Contractor                      
                                                            10-4                0                  03/12/02   08/19/03    AAR Contractor                      
                                                            10-5            4,476                  03/12/02   08/19/03    AAR Contractor                      
                                                            10-6           -1,518                  03/12/02   08/19/03    AAR Contractor                      
                                                            2               7,048                  03/12/02   09/05/03    Harold R. Clune                     
                                                            2-1               285                  03/12/02   09/05/03    Miscellaneous Iron Fabricators      
 
00-1450   Reconstruction               0-001-008  04/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SS03-1         -1,664                  12/13/02   01/10/03    Gen. Elec. Systems                  
                                                            SS03-2           -300                  06/18/03   06/25/03    Gen. Elec. Systems                  
                                                            SS03-4D        32,007                  02/16/06   06/20/06    General Electrical Systems          
 
04-1381   Reconstruction               0-001-009  10/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            SS04-2B          -500                  03/27/07   05/16/07    Callanan Industries                 
                                                            ss05-2C          -885                  03/14/07   08/01/07    Life Safety Engineered              
 
07-1924   Reconstruction               0-001-010  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG06-3         26,896                  01/26/10   02/23/10    BAST HATFIELD INC                   
                                                            EG06-9            824                  06/22/10   08/18/10    BAST HATFIELD INC                   
                                                            EG08-1         -4,836                  12/10/10   02/18/11    T. LEMME MECHANICAL INC             
 
12-1137   Reconstruction               0-001-011  05/07/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC02-1           -866                  11/25/13   12/18/13    MOISTURE BARRIERS                   
                                                            GC02-2        -17,566                  11/25/13   12/18/13    MOISTURE BARRIERS                   
 
13-0347   Reconstruction               0-001-012  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-1            1,785                  02/09/15   06/17/15    Jersen Construction Group           
                                                            01-10             450                  02/09/15   06/17/15    Jesen Construction Group            
                                                            01-22          -1,378                  02/09/15   06/17/15    Jersen Construction Group           
                                                            02B-3           7,304                  11/25/14   02/06/15    Titan Roofing, Inc.                 
                                                            05-16             845                  01/06/15   02/05/15    Carey Electric                      
                                                            05-6            5,273                  01/06/15   02/05/15    Carey Electric                      
 
13-1524   Reconstruction               0-001-013  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-18           8,860                  02/03/16   04/15/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-21           6,841                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-28          18,515                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-33           4,748                  07/22/16   09/30/16    Bunkoff General Contractors, Inc.   
                                                            09-34          12,798                  07/22/16   09/30/16    Bunkoff General Contractors, Inc.   
                                                            09-35          18,304                  07/22/16   09/30/16    Bunkoff General Contractors, Inc.   
                                                            09-36          12,914                  07/22/16   09/30/16    Bunkoff General Contractors, Inc.   
                                                            09-4              566                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            09-41           1,649                  10/17/16   11/01/16    Bunkoff General Contractors, Inc.   
                                                            09-47           3,511                  12/20/16   01/17/17    Bunkoff General Contractors, Inc.   
                                                            10-12               0                  10/05/16   12/19/16    Tri-Valley Plumbing & Heating       
                                                            10-13          12,042                  11/21/16   01/06/17    Tri-Valley Plumbing & Heating       
                                                            10-16           4,230                  12/20/16   01/06/17    Tri-Valley Plumbing & Heating       
                                                            10-19             702                  01/19/17   01/19/17    Tri-Valley Plumbing & Heating       
                                                            10-4            1,804                  10/28/15   06/01/17    Tri-Valley Plumbing & Heating       
                                                            11-7            3,643                  06/03/16   07/07/16    TRI-VALLEY HEATING & PLUMBING       
                                                            12-12           9,699                  12/20/16   01/06/17    Harold R. Clune, Inc.               
                                                            12-13           1,276                  12/20/16   01/06/17    Harold R. Clune, Inc.               
                                                            12-14           9,783                  12/20/16   01/06/17    Harold R. Clune, Inc.               
                                                            12-16           1,255                  12/20/16   01/06/17    Harold R. Clune, Inc.               
                                                            12-3           18,770                  12/18/15   01/15/16    HAROLD R CLUNE INC                  
                                                            12-4           15,852                  12/18/15   01/15/16    HAROLD R. CLUNE INC                 
 
15-0535   Reconstruction               0-001-014  12/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GO1-01           -504                  05/11/16   05/19/16    BAST HATFIELD                       
                                                            GO2-1           4,446                  04/11/16   05/09/16    The Trane Company                   
 
18-0539   Reconstruction               0-001-015  09/23/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C21-06         24,027                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-07         15,578                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-08         10,515                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-10          3,025                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-17            734                  01/27/22   02/01/23    Riverview Const Assocs Inc          
                                                            C21-18         22,052                  01/27/22   02/01/23    Riverview Const Assocs inc          
                                                            C21-22        -22,700                  02/14/22   02/16/23    Riverview Const Assoc Inc           
                                                            C22-1         -47,645                  10/31/22   12/13/23    James Edgar Roofg Co Inc            
                                                            C24-10           -285                  10/31/22   11/15/23    BPI Mech Serv Inc                   
                                                            C24-4          10,114                  05/26/22   04/10/23    BPI Mech Serv Inc                   
                                                            C25-10         11,699                  01/27/22   01/27/23    Harold Clune Inc                    
                                                            C25-14          2,224                  05/26/22     /  /      Harold Clune Inc                    
                                                            C25-3           9,460                  05/26/21   07/02/21    Harold R. Clune Inc                 
                                                            C25-4           8,295                  05/26/21   07/30/21    Hrold R. Clune Inc                  
                                                            C25-5             190                  01/27/22   01/27/23    Harold Clune Inc                    
                                                            C25-9           4,367                  01/27/22   01/27/23    Harold Clune Inc                    
                                                            C26-1           3,952                  05/26/21   07/02/21    Trane Commercial Systems & Srvcs    
                                                            C26-2          34,250                  05/26/21   07/02/21    Trane Commercial Systems and Srvcs  
                                                            C26-3          22,528                  05/26/22   04/10/23    Trane Comm Sys&Servs                
 
21-0669   Reconstruction               0-001-016  11/12/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C40-1          25,000                  01/20/23   12/12/23    DUNCAN & CAHILL                     
                                                            C41-1          14,664                  01/20/23   06/13/23    DI GESARE MECH                      
                                                            C41-2          26,848                  01/20/23   06/13/23    DI GESARE MECH                      
                                                            C41-3           1,854                  01/20/23   06/13/23    DI GESARE MECH                      
                                                            C41-4         -16,164                  01/20/23   06/13/23    DiGesare Mechanical                 
 
02-1443FP Reconstruction               0-001-FP1  08/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Green Meadow Elem School:
91-1449   Reconstruction               0-002-004  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1450   Reconstruction               0-002-005  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0821   Reconstruction               0-002-006  03/01/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0822   Reconstruction               0-002-007  03/01/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0110   Additions and Alterations    0-002-008  09/19/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            11-1          -20,061                  03/13/02   05/24/02    Zandri Construction                 
                                                            11-10           1,545                  03/13/02   03/16/05    Zandri Construction                 
                                                            11-11          10,749                  03/13/02   04/30/04    Zandri Construction                 
                                                            11-12             822                  03/13/02   06/21/04    Zandri Construction                 
                                                            11-2           -8,034                  03/13/02   03/16/05    Zandri Construction                 
                                                            11-3                0                  03/13/02     /  /      Zandri Construction                 
                                                            11-4                0                  03/13/02     /  /      Zandri Construction                 
                                                            11-5                0                  03/13/02     /  /      Zandri Construction                 
                                                            11-6                0                  03/13/02     /  /      Zandri Construction                 
                                                            11-7                0                  03/13/02     /  /      Zandri Construction                 
                                                            11-8                0                  03/13/02     /  /      Zandri Construction                 
                                                            11-9           -9,741                  03/13/02   03/16/05    Zandri Construction                 
                                                            12-1                0                  03/13/02     /  /      Albany Steel                        
                                                            12-2                0                  03/13/02   06/28/04    Albany Steel                        
                                                            12-3                0                  03/13/02     /  /      Albany Steel                        
                                                            12-4                0                  03/13/02     /  /      Albany Steel                        
                                                            12-5             -640                  03/13/02   04/30/04    Albany Steel                        
                                                            12-6           -1,468                  03/13/02   05/24/02    Albany Steel                        
                                                            13-1           -4,350                  03/13/02   05/24/02    MACC Enterprises                    
                                                            13-2           -4,775                  03/13/02   05/24/02    MACC Enterprises                    
                                                            13-3           -7,610                  03/13/02   05/24/02    MACC Enterprises                    
                                                            14-1                0                  03/13/02     /  /      Monahan and Loughlin                
                                                            14-2           -2,520                  03/13/02   05/24/02    Monahan and Loughlin                
                                                            15-1                0                  03/13/02     /  /      Robinson Hall Architectural         
                                                            15-2           -4,884                  03/13/02   05/24/02    Robinson Hall Architectural         
                                                            16-1          -10,738                  03/12/02   03/16/05    John V. Warren                      
                                                            16-2           -2,734                  03/12/02   03/16/05    John V. Warren                      
                                                            16-3                0                  03/12/02     /  /      John V. Warren                      
                                                            16-4                0                  03/12/02     /  /      John V. Warren                      
                                                            16-5            1,537                  03/12/02   06/24/04    John V. Warren                      
                                                            16-6            4,171                  03/12/02   04/30/04    John V. Warren                      
                                                            16-7                0                  03/12/02   04/30/04    John V. Warren                      
                                                            17-1                0                  03/12/02     /  /      Campito Plumbing                    
                                                            17-2                0                  03/12/02     /  /      Campito Plumbing                    
                                                            17-3                0                  03/12/02   04/30/04    Campito Plumbing                    
                                                            17-4                0                  03/12/02   04/30/04    Campito Plumbing                    
                                                            17-5                0                  03/12/02   04/30/04    Campito Plumbing                    
                                                            17-6               57                  03/12/02   06/21/04    Campito Plumbing                    
                                                            17-7           -1,038                  03/12/02   04/30/04    Campito Plumbing                    
                                                            17-8                0                  03/12/02     /  /      Campito Plumbing                    
                                                            17-9             -712                  03/12/02   04/30/04    Campito Plumbing                    
                                                            18-1                0                  03/12/02     /  /      Weisburgh Mech.                     
                                                            18-10          39,000                  06/17/04   06/21/04    Weisburgh Mech.                     
                                                            18-11           3,000                  06/17/04   06/21/04    Weisburgh Mech.                     
                                                            18-12           1,467                  06/17/04   06/21/04    Weisburgh Mech.                     
                                                            18-13           2,518                  01/22/03   02/10/03    Weisburgh Mech.                     
                                                            18-2                0                  03/12/02     /  /      Weisburgh Mech.                     
                                                            18-3                0                  03/12/02     /  /      Weisburgh Mech.                     
                                                            18-4                0                  03/12/02     /  /      Weisburgh Mech.                     
                                                            18-5                0                  03/12/02     /  /      Weisburgh Mech.                     
                                                            18-6                0                  03/12/02     /  /      Weisburgh Mech.                     
                                                            18-7                0                  03/12/02     /  /      Weisburgh Mech.                     
                                                            18-8            3,146                  03/12/02   06/21/04    Weisburgh Mech.                     
                                                            18-9           84,000                  06/17/04   06/21/04    Weisburgh Mech.                     
                                                            19-1            3,240                  03/13/02   04/30/04    AAR Contractor                      
                                                            19-2           -2,993                  03/13/02   04/30/04    AAR Contractor                      
                                                            19-3           -5,000                  03/13/02   05/24/02    AAR Contractor                      
 
95-0944   Reconstruction               0-002-010  03/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1451   Reconstruction               0-002-011  04/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -300                  12/13/02   01/10/03    S&L Roofing                         
                                                            3-3D            3,272                  07/30/04   09/23/04    Gen. Elec. Systems                  
                                                            AA-2                0                  06/18/03   06/25/03    Gen. Elec. Systems                  
                                                            SS03-2            726                  06/18/03   06/25/03    Gen. Elec. Systems                  
                                                            SSO1-1         -1,125                  01/13/03   02/12/03    S&L Roofing                         
 
04-1382   Reconstruction               0-002-012  10/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SS05-1F        -2,163                  03/14/07   08/01/07    Life Safedty Engineered             
                                                            SS05-2F          -883                  03/14/07   08/01/07    Life Safety Engineered              
 
07-1919   Reconstruction               0-002-013  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC06-4          1,050                  01/26/10   02/23/10    BAST HATFIELD INC                   
                                                            EG07-1          4,726                  06/22/10   08/18/10    BURNICHE PIPING INC (dba BPI PIPING)
 
07-0971   Reconstruction               0-002-014  10/01/07  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0348   Reconstruction               0-002-015  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-20             629                  02/09/15   06/17/15    Jersen Construction Group           
                                                            01-3            1,786                  02/09/15   06/17/15    Jersen Construction Group           
                                                            01-9              824                  02/09/15   06/17/15    Jersen Construction Group           
                                                            02B-2          -5,841                  11/25/14   02/06/15    Titan Roofing, Inc.                 
                                                            05-14           3,748                  01/06/15   02/05/15    Carey Electric                      
                                                            05-19           1,569                  03/19/15   03/27/15    Carey Electric                      
                                                            05-4            5,033                  01/06/15   02/05/15    Carey Electric                      
 
13-1525   Reconstruction               0-002-016  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-12           8,496                  02/03/16   04/15/16    BUNLOFF GENERAL CONTRACTORS INC     
                                                            09-13           4,044                  02/03/16   09/23/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-3              566                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            09-31           1,431                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-6            1,064                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            10-3            2,198                  10/28/15   01/15/16    Tri-Valley Plumbing & Heating       
                                                            10-6            1,370                  12/18/15   01/15/16    TRI-VALLEY PLUMBING & HEATING       
                                                            11-3              665                  12/18/15   01/15/16    TRI-VALLEY PLUMBING & HEATING       
 
18-0540   Reconstruction               0-002-017  09/23/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C21-14          3,068                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-21         -6,133                  01/27/22   02/01/23    Riverview Const Assoc Inc           
                                                            C21-23          5,156                  05/26/22   04/10/23    Riverview Const Assocs Inc          
                                                            C21-24          8,014                  07/25/22   05/22/23    Riverview Const Assocs Inc          
                                                            C23-1          -4,172                  10/21/21   08/02/22    DiGesare Mech Inc                   
                                                            C23-2          -6,168                  01/27/22   01/27/23    DiGesare Mech Inc                   
                                                            C23-3         -42,203                  05/26/22   04/10/23    DiGesare Mech Inc                   
                                                            C24-1           8,435                  12/03/21   09/20/22    BPI Mech Service Inc                
                                                            C24-3           1,063                  01/27/22   01/27/23    BPI Mech Serv Inc                   
                                                            C24-5           3,486                  05/26/22   04/10/23    BPI Mech Serv Inc                   
                                                            C24-6         -25,241                  05/26/22   04/10/23    BPI Mech Serv Inc                   
                                                            C24-8           2,009                  10/31/22   12/13/23    BPI Mech Service Inc                
                                                            C25-1           9,460                  05/26/21   07/30/21    Harold R. Clune Inc                 
                                                            C25-11            536                  01/27/22   02/01/23    Clune Inc                           
                                                            C25-12         -5,500                  02/14/22   02/13/23    Harold Clune Inc                    
                                                            C25-7           5,971                  01/27/22   02/01/23    Harold Clune Inc                    
                                                            c21-03         16,250                  11/18/21   12/09/22    Riverview Const Assoc Inc           
 

          Citizen Genet School:
90-1458   Reconstruction               0-003-003  06/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1451   Reconstruction               0-003-004  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0823   Reconstruction               0-003-005  03/01/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0756   Reconstruction               0-003-007  03/02/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            30-01          27,369                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-02           4,961                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-03          30,661                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-04           3,201                  03/13/02   06/28/04    Dutch Valley Gen. Contractors       
                                                            30-05           9,311                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-06             116                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-07          -8,801                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-08             840                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-09           6,862                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-10           8,065                  03/12/02   06/28/04    Dutch Valley Gen. Contractors       
                                                            30-11           1,785                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-12             551                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-13               0                  03/13/02   06/28/04    Dutch Valley Gen. Contractors       
                                                            30-14             -65                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-15            -746                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-16         -27,825                  04/21/04   01/04/07    Dutch Valley Gen. Contractors       
                                                            30-17          38,372                  12/22/06   01/04/07    Dutch Valley Contracting, Inc.      
                                                            31-01           1,497                  04/21/04   01/04/07    Universal Custom Millwork           
                                                            31-02             351                  04/21/04   01/04/07    Universal Custom Millwork           
                                                            31-03             384                  04/21/04   01/04/07    Universal Custom Millwork           
                                                            33-01          -1,000                  04/21/04   01/04/07    Bay State Elevator                  
                                                            34-1                0                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            34-2                0                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            34-3            7,145                  04/26/04   04/30/04    DiGesare Mech.                      
                                                            34-4             -365                  04/26/04   04/30/04    DiGesare Mech.                      
                                                            34-5                0                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            34-6                0                  04/26/04   04/30/04    DiGesare Mech.                      
                                                            34-7             -194                  06/01/04   06/02/04    DiGesare Mech.                      
                                                            34-8           -6,979                  12/22/06   01/04/07    DiGesare Mechanical, Inc.           
                                                            35-1                0                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            35-10          -4,901                  06/01/04   06/02/04    DiGesare Mech.                      
                                                            35-11            -500                  06/17/04   06/21/04    DiGesare Mech.                      
                                                            35-2                0                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            35-3                0                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            35-4                0                  04/26/04   04/30/04    DiGesare Mech.                      
                                                            35-5            1,442                  04/26/04   04/30/04    DiGesare Mech.                      
                                                            35-6             -420                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            35-7             -396                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            35-8                0                  04/26/04   04/26/04    DiGesare Mech.                      
                                                            35-9                0                  04/26/04   04/26/04    DeGesare Mech.                      
                                                            36-1               12                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-10           6,788                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-11           1,188                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-12          -1,000                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-13             -85                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-14           7,062                  06/01/04   06/02/04    Hendler Elec.                       
                                                            36-15          -3,000                  12/22/06   01/04/07    Hendler Electric                    
                                                            36-2                0                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-4            1,576                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-5              883                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-6            4,523                  03/13/02   06/28/04    Hendler Elec.                       
                                                            36-7                0                  04/26/04   04/26/04    Hendler Elec.                       
                                                            36-8                0                  04/26/04   04/26/04    Hendler Elec.                       
                                                            37-1                0                  04/26/04   04/30/04    USA Remediation                     
                                                            37-2           12,696                  04/26/04   04/30/04    USA Remediation                     
                                                            37-3           -1,120                  04/26/04   04/30/04    USA Remediation                     
                                                            37-5             -376                  03/13/02   06/28/04    USA Remediation                     
 
00-1452   Reconstruction               0-003-009  04/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SS03-1         -1,664                  12/13/02   01/10/03    Gen. Elec. Systems                  
                                                            SS03-4A        32,007                  02/16/06   06/20/06    General Electrical systems          
 
04-1383   Reconstruction               0-003-010  10/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SS05-1D        -2,434                  03/14/07   08/01/07    Life Safety Engineered              
                                                            ss05-2D          -883                  03/14/07   08/01/07    Life Safeth Engineered              
 
07-1920   Reconstruction               0-003-011  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC06-11         2,655                  08/02/10   09/03/10    BAST HATFIELD, INC.                 
                                                            EG05-1        -79,757                  02/09/11   02/25/11    GANEM CONTRACTING                   
                                                            EG05-2         -4,850                  04/20/12   08/31/12    GANEM CONTRACTING                   
                                                            EG06-13         6,487                  12/03/10   12/28/10    BAST HATFIELD INC                   
                                                            EG06-15        69,767                  04/22/11   01/08/15    BAST HATFIELD INC                   
                                                            EG06-6         74,042                  01/26/10   02/23/10    BAST HATFIELD INC                   
                                                            EG06-8          7,584                  06/22/10   08/18/10    BAST HATFIELD INC                   
                                                            EG07-2          3,721                  06/22/10   08/18/10    BURNICHE PIPING INC (dba BPI PIPING)
                                                            EG07-3          1,578                  06/22/10   08/18/10    BURNICHE PIPING INC (dba BPI PIPING)
                                                            EG09-2         16,313                  08/17/10   09/13/10    STILSING ELECTRIC INC               
                                                            EG12-1          9,759                  01/18/11   02/15/11    LASH CONTRACTING INC                
                                                            EG13-1         -4,836                  12/03/10   12/28/10    MAZONE PLUMBING & HEATING INC       
                                                            EG15-1         12,728                  04/23/13   06/13/14    THEATRICAL SERVICES & SUPPLIES INC  
 
09-0600   Reconstruction               0-003-012  09/24/09  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0349   Reconstruction               0-003-013  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            01-11             824                  02/09/15   03/24/15    Jersen Construction Group           
                                                            01-16           1,340                  02/09/15   03/24/15    Jersen Construction Group           
                                                            01-25            -632                  02/09/15   03/24/15    Jersen Construction Group           
                                                            01-28           1,597                  06/05/15   06/18/15    Jersen Construction Group           
                                                            01-7            1,786                  02/09/15   03/24/15    Jersen Construction Group           
                                                            02A-2          -6,591                  11/25/14   02/06/15    S & L Roofing & Sheet Metal, Inc.   
                                                            02A-4         -14,232                  01/20/15   01/28/15    S&L Roofing & Sheet Metal, Inc.     
                                                            05-1            6,140                  01/06/15   02/05/15    Carey Electric                      
                                                            05-12           1,010                  01/06/15   02/05/15    Carey Electric                      
                                                            05-2            4,392                  01/06/05   02/05/15    Carey Electric                      
 
13-0786   Reconstruction               0-003-014  03/14/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06-1            9,300                  02/09/15   02/27/15    Jersen Construction                 
                                                            06-2           10,710                  02/09/15   02/27/15    Jersen Construction                 
                                                            06-3           18,900                  02/09/15   02/26/15    Jersen Construction                 
                                                            06-4           15,120                  02/09/15   02/26/15    Jersen Construction                 
                                                            06-5            5,089                  02/09/15   02/26/15    Jersen Construction                 
                                                            07-1            3,711                  11/18/14   11/21/14    Tri Valley Plumbing & Heating       
                                                            07-2           -1,650                  01/20/15   01/26/15    Tri Valley Plumbing & Heating       
                                                            07-3           -3,063                  03/19/15   03/25/15    Tri Valley Plumbing & Heating       
                                                            08-1                0                  11/18/14   11/21/14    CKM Electrical Services, Inc.       
                                                            08-2            2,902                  11/18/14   11/21/14    CKM Electrical Serivces, Inc.       
                                                            08-3            1,923                  01/06/15   07/30/15    CKM Electrical Services, Inc.       
 
13-1526   Reconstruction               0-003-015  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-1              565                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            09-19           2,411                  02/03/16   02/17/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-26          18,842                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-27         -10,736                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-38          19,720                  09/28/16   10/27/16    Bunkoff General Contractors, Inc.   
                                                            09-39          11,701                  09/28/16   10/27/16    Bunkoff General Contractors, Inc.   
                                                            09-42           6,401                  10/05/16   12/19/16    Bunkoff General Contractors, Inc.   
                                                            09-46           3,950                  12/20/16   01/17/17    Bunkoff General Contractors, Inc.   
                                                            10-1            1,825                  10/28/15   01/15/16    Tri-Valley Plumbing & Heating       
                                                            10-15           3,937                  12/20/16   01/06/17    Tri-Valley Plumbing & Heating       
                                                            10-17             813                  12/20/16   01/06/17    Tri-Valley Plumbing & Heating       
                                                            10-8               87                  12/18/15   01/15/16    TRI-VALLEY PLUMBING & HEATING       
                                                            11-8           17,563                  11/22/16   01/06/17    Tri-Valley Plumbing and Heating     
                                                            11-9            6,875                  11/22/16   01/06/17    Tri-Valley Plumbing & Heating       
 
15-0651   Reconstruction               0-003-016  01/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A01-2          -3,297                  11/10/16   11/16/16    Bunkoff General Contractors, Inc.   
                                                            A02-1             963                  10/17/16   10/20/16    Burniche Piping, Inc.               
                                                            A02-2           1,487                  10/17/16   10/20/16    Burniche Piping, Inc.               
 
20-0365   Reconstruction               0-003-017  02/16/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            38-3            7,582                  10/13/22   12/18/23    Murnane Bldg Contrs                 
                                                            C31-1          13,657                  08/26/21   06/02/22    MURNANE BLDG CONTRACTORS            
                                                            C31-11          1,908                  05/26/22   01/30/23    Murnane Bldg Contrs                 
                                                            C31-13         25,329                  05/26/22   01/30/23    Murnane Bldg Contrs                 
                                                            C31-14          9,490                  05/26/22   01/30/23    Murnane Bldg Contrs                 
                                                            C31-17         36,186                  07/25/22   05/22/23    Murname Bldg Contrs                 
                                                            C31-18         20,979                  07/25/22   05/22/23    Murnane Bldg Contrs                 
                                                            C31-19         21,584                  07/25/22   05/22/23    Murname Bldg Contrs                 
                                                            C31-20          9,879                  10/13/22   12/13/23    Murnane Bldg Contrs                 
                                                            C31-27         19,122                  01/17/23   09/19/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-29         25,047                  01/17/23   09/19/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-31         76,452                  01/18/23   09/19/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-34          4,043                  01/17/23   09/19/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-37         21,743                  02/02/23   11/29/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-4          -1,172                  11/26/21   11/30/22    Murnane Bldg Contrs                 
                                                            C31-41          8,507                  02/02/23   12/18/23    MURNBANE BUILDING CONTRACTORS       
                                                            C31-42         10,765                  03/03/23   12/15/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-45            525                  03/03/23   12/15/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-46          1,994                  05/01/23   12/28/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-5           1,848                  12/03/21   11/30/22    Murname Bldg Contrs                 
                                                            C31-6          18,995                  01/27/22   02/22/23    Murnane Bldg Contr                  
                                                            C31-8           5,169                  05/26/22   01/30/23    Murnane Bldg Contrs                 
                                                            C32-4           1,729                  03/03/23   12/15/23    MONAHAN & LOUGHLIN LLC              
                                                            C32-5           2,726                  02/02/23     /  /      MONAHAN & LAUGHLIN LLC              
                                                            C32-5           2,726                  05/02/23   12/18/23    MONAHAN & LOUGHLIN                  
                                                            C32-6           1,002                  05/02/23   12/28/23    MONAHAN & LOUGHLIN                  
                                                            C32-7          78,000                  06/07/23   12/28/23    MONAHAN & LOUGHLIN                  
                                                            C32-8           5,459                  06/14/23   12/18/23    MONAHAN & LOUGHLIN                  
                                                            C33-2           1,100                  03/03/23   12/14/23    COLLETT MECH INC                    
                                                            C34-3           3,548                  10/13/22   05/16/23    T. McElligott Inc.                  
                                                            C34-5           2,461                  01/17/23   11/16/23    T MCELLIGOT INC                     
                                                            C34-7           3,000                  02/02/23   11/29/23    T. MCELLIGOTT INC                   
                                                            C34-8           6,548                  02/02/23   11/29/23    T MCELLIGOTT INC                    
                                                            C35-11         34,487                  05/26/22   04/10/23    Schcdy Hardware&Elec Inc            
                                                            C35-12          4,274                  05/26/22   04/10/23    Schdy Hardware&Elec Inc             
                                                            C35-15            429                  07/25/22   05/04/23    Schenectady Hardware&elec Inc       
                                                            C35-16          3,662                  07/25/22   05/04/23    Schenectady Hardware&Elec Inc       
                                                            C35-18         12,412                  07/25/22   05/04/23    Schenectady Hardware&Elec Inc       
                                                            C35-19          3,211                  10/13/22   05/16/23    Schenectady Hardware&Elec Inc       
                                                            C35-20          6,852                  10/13/22   05/16/23    Schenectady Hardware&Elec Inc       
                                                            C35-22          7,471                  10/13/22   05/16/23    Schenectady hardware&Elec Inc       
                                                            C35-24            445                  10/13/22   05/16/23    Schtady Hardware&Elec Inc           
                                                            C35-28            850                  01/17/23   11/16/23    SCHENTECTADY HARDWARE & ELEC INC    
                                                            C35-3           8,109                  11/26/21   12/15/22    Schtdy Hardware&Elec Inc            
                                                            C35-32            886                  02/02/23   11/29/23    SCHENECTADY HARDWARE & ELEC INC     
                                                            C35-35          4,471                  02/02/23   11/29/23    SCHENECTADY HARDWARE & ELEC INC     
                                                            C35-38          5,759                  05/02/23   12/27/23    SCHENECTADY HARDWARE & ELECTRIC     
                                                            C35-8           6,658                  05/26/22   04/10/23    Schenectady Hardware&Elec Inc       
                                                            C36-10          2,750                  07/25/22   05/22/23    HMA Contrg Corp                     
                                                            C36-14          8,247                  09/15/22   10/03/23    HMA Contr Corp                      
                                                            C36-23         16,972                  01/17/23   11/16/23    HMA CONTRACTING CORP                
                                                            C36-24         22,862                  01/17/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-27          2,020                  01/17/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-29         10,307                  01/17/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-6          15,042                  05/26/22   01/30/23    HMA Contrs Corp                     
                                                            C36-9          26,388                  07/25/22   05/22/23    HMA Contrg Corp                     
                                                            C38-1           3,300                  08/29/22   08/22/23    Murnane Bldg Contrs                 
                                                            C38-11         12,845                  03/03/23   12/15/23    MURNANE BUILDING CONTRACTORS        
                                                            C38-12          3,367                  05/02/23   12/28/23    MURNANE BUILDING CONTRACTORS        
                                                            C38-4          42,333                  01/20/23   12/12/23    MURNANE BUILDING CONTRACTORS        
                                                            C38-5          16,464                  01/20/23   12/12/23    MURNANE BUILDING CONTRACTORS        
                                                            C38-7           1,625                  02/02/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            C38-8          16,333                  02/02/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            C38-9           6,665                  03/03/23   12/15/23    MURNANE BUILDING CONTRACTORS        
 
22-1698   Reconstruction               0-003-018  06/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sutherland School:
91-0323   Reconstruction               0-006-004  10/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1452   Reconstruction               0-006-005  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0824   Reconstruction               0-006-006  03/01/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0622   Additions and Alterations    0-006-007  03/02/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            38-1             -541                  02/25/02   04/04/02    Mossbrook, Inc                      
                                                            38-2                0                  02/25/02   04/04/02    Mossbrook, Inc                      
                                                            38-3                0                  02/25/02   04/04/02    Mossbrook, Inc                      
                                                            38-4         -205,452                  02/25/02   06/28/04    Mossbrook, Inc                      
                                                            38R-1         205,453                  02/25/02   06/24/04    RLI Insurance Company               
                                                            38R-10        -21,500                  07/16/04   07/16/04    RLI Insurance Company               
                                                            38R-2           7,272                  06/23/04   06/24/04    RLI Insurance Company               
                                                            38R-3               0                  02/25/02     /  /      RLI Insurance Company               
                                                            38R-4           3,834                  02/25/02   06/24/04    RLI Insurance Company               
                                                            38R-5          -2,865                  02/25/02   06/24/04    RLI Insurance Company               
                                                            38R-6          11,766                  02/25/02   06/24/04    RLI Insurance Company               
                                                            38R-7           3,315                  02/25/02   06/02/04    RLI Insurance Company               
                                                            38R-8            -688                  02/25/02   04/04/02    RLI Insurance Company               
                                                            38R-9          -2,741                  06/01/04   06/02/04    RLI Insurance Company               
                                                            39-1                0                  02/25/02   04/04/02    STS Steel, Inc                      
                                                            39-2                0                  02/25/02   04/04/02    STS Steel, Inc                      
                                                            39-3           -3,383                  02/25/02   04/04/02    STS Steel, Inc                      
                                                            40-1           -1,535                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            40-2           -4,200                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            40-3           -3,500                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            40-4                0                  02/25/02     /  /      Universal Custom Millwork           
                                                            40-5            1,802                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            41-1                0                  02/25/02   04/04/02    Weather Guard Industries, Inc       
                                                            41-2           -4,523                  02/25/02   04/04/02    Weather Guard Industries, Inc       
                                                            42-1           -7,564                  02/25/02   04/04/02    Robinson Hall Architectural Pro.    
                                                            42-2                0                  02/25/02   04/04/02    Robinson Hall Arthitectural Pro.    
                                                            42-3           -3,520                  02/25/02   04/04/02    Robinson Hall Architectural Pro     
                                                            43-1                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            43-2                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            43-3                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            43-4           -1,105                  03/12/02   06/02/04    Mazone Plumbing                     
                                                            43-5                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            43-6             -184                  03/12/02   06/02/04    Mazone Plumbing                     
                                                            43-7           -3,022                  03/12/02   06/02/04    Mazone Plumbing                     
                                                            43-8                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            44-1           -1,060                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            44-10               0                  05/10/04   05/14/04    Crisafulli Brothers                 
                                                            44-11            -400                  05/10/04   05/14/04    Crisafulli Brothers                 
                                                            44-2                0                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            44-3                0                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            44-4                0                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            44-5             -351                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            44-6             -347                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            44-7            6,824                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            44-8            1,156                  03/12/02   06/24/04    Crisafulli Brothers                 
                                                            44-9              894                  03/12/02   05/14/04    Crisafulli Brothers                 
                                                            45-1                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-2                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-3                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-4                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-5                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-6                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-7                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-8                0                  03/12/02     /  /      Justin Electrical                   
                                                            45-9           -4,989                  03/12/02   06/02/04    Justin Electrical                   
                                                            46-1                0                  02/25/02     /  /      USA Remediation Services            
                                                            46-2              264                  02/25/02   04/04/02    USA Remediation Services            
                                                            46-3            2,456                  02/25/02   04/04/02    USA Remediation Services            
                                                            46-4           -1,500                  02/25/02   06/28/04    USA Remediation Services            
                                                            46-5           16,890                  02/25/02   06/28/04    USA Remediation Services            
                                                            46-6           24,341                  02/25/02   04/04/02    USA Remediation Services            
                                                            46-7             -320                  02/25/02   04/04/02    USA Remediation Services            
                                                            56-1           14,224                  02/25/02   04/04/02    Magnum Services                     
                                                            56-2              840                  02/25/02   04/04/02    Magnum Services                     
                                                            56-3            5,866                  02/25/02   04/04/02    Magnum Services                     
                                                            56-4           15,869                  02/25/02   04/04/02    Magnum Services                     
                                                            56-5             -348                  02/25/02   04/04/02    Magnum Services                     
                                                            56-6              -46                  02/25/02   04/04/02    Magnum Services                     
                                                            57-1                0                  03/12/02     /  /      Adirondack Cabling                  
                                                            57-2                0                  03/12/02     /  /      Adirondack Cabling                  
                                                            57-3           -1,646                  03/12/02   06/21/04    Adirondack Cabling                  
 
00-1453   Reconstruction               0-006-008  04/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  12/13/02   01/10/03    S&L Roofing                         
                                                            3-3B            3,272                  07/30/04   09/23/04    Gen. Elec. Systems                  
                                                            SS01-1           -932                  01/13/03   02/12/03    S&L Roofing                         
                                                            SS03-1         -1,109                  12/13/02   01/10/03    Gen. Elec. Systems                  
                                                            SS03-4C        32,007                  02/16/06   06/20/06    General Electrical Systems          
 
04-1384   Reconstruction               0-006-009  10/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SS04-1            245                  08/18/06   10/02/06    Callanan Industries                 
                                                            SS04-2A          -500                  03/27/07   05/16/07    Callanan Industries                 
                                                            SS05-2B          -883                  03/14/07   08/01/07    Life Safeth Engineered              
 
07-1925   Reconstruction               0-006-011  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG06-2         16,706                  01/26/10   02/23/10    BAST HATFIELD INC                   
                                                            EG09-1         15,825                  08/17/10   09/13/10    STILSING ELECTRIC INC               
                                                            EG09-3          1,005                  09/01/10   09/28/10    STILSING ELECTRIC INC               
                                                            EG12-2         16,934                  03/28/11   03/28/11    LASH CONTRACTING INC                
 
13-0350   Reconstruction               0-006-013  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-12             824                  02/09/15   07/03/15    Jersen Construction Group           
                                                            01-17             446                  02/09/15   07/03/15    Jersen Construction Group           
                                                            01-26            -636                  02/09/15   07/03/15    Jersen Construction Group           
                                                            01-4            1,786                  02/09/15   07/03/15    Jesen Construction Group            
                                                            02B-1          -1,936                  11/25/14   02/06/15    Titan Roofing, Inc.                 
                                                            05-13             361                  01/06/15   02/05/15    Carey Electric                      
                                                            05-20           1,569                  03/19/15   03/27/15    Carey Electric                      
                                                            05-7            5,532                  01/06/15   07/30/15    Carey Electric                      
 
13-1527   Reconstruction               0-006-014  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-11           4,596                  02/03/16   04/15/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-2            3,757                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            09-23          16,454                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-24           9,430                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-25          11,287                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            10-11           1,174                  06/10/16   07/08/16    TRI-VALLEY P&H                      
                                                            10-2            1,823                  10/28/15   01/15/16    Tri-Valley Plumbing & Heating       
                                                            10-7            1,040                  12/18/15   01/15/16    TRI-VALLEY PLUMBING & HEATING       
                                                            11-5              523                  12/18/15   01/15/16    TRI-VALLEY PLUMBING 7 HEATING       
                                                            11-6              172                  06/03/16   07/07/16    TRI-VALLEY PLUMBING & HEATING       
                                                            12-8            5,801                  06/03/16   07/07/16    HAROLD R CLUNE                      
 
13-1487   Reconstruction               0-006-015  04/07/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-1          -25,000                  11/18/14   11/24/14    Mid State Industries, Ltd.          
 
15-0652   Reconstruction               0-006-016  01/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A01-1          -5,000                  09/28/16   10/18/16    Bunkoff General Contractors, Inc.   
 
15-1520   Reconstruction               0-006-017  04/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M01-1               0                  11/21/16   11/28/16    Bunkoff General Contractors, Inc.   
 
20-0366   Reconstruction               0-006-018  02/16/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            31-23           4,628                  10/13/22   12/18/23    Murnane Bldg Contrs                 
                                                            35-23           1,741                  10/13/22   05/16/23    Schdy Hardware&Elec Inc             
                                                            C31-16          2,044                  07/25/22   05/22/23    Murnane Bldg Contrs                 
                                                            C31-2           4,113                  11/18/21   12/01/22    Murnane Building Contractors        
                                                            C31-33          8,933                  01/03/23   12/11/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-39            597                  02/02/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            C34-4           4,416                  01/03/23   10/19/23    T. MCELLIGOTT INC                   
                                                            C35-2          14,482                  08/26/21   11/25/22    SCHENECTADY HARDWARE&ELECTRIC, INC  
                                                            C35-27          2,990                  01/03/23   10/19/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-29          1,554                  01/03/23   10/19/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-4           7,618                  11/26/21   12/15/22    Schenectdy Hardware&Elec Inc        
                                                            C36-1           5,256                  11/08/21   12/12/22    HMA Contracting Corp                
                                                            C36-16         14,813                  01/03/23   12/11/23    HMA CONTRACTING CORP                
                                                            C36-17         24,369                  01/03/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-19         15,150                  01/03/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-20         26,105                  01/03/23   10/19/23    HMA CONTRACTING CORP                
                                                            C36-22         28,595                  01/03/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-25         20,972                  01/03/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-26          2,465                  01/03/23   09/19/23    HMA CONTRACTING CORP                
                                                            C36-8          43,875                  07/25/22   05/22/23    HMA Const Corp                      
                                                            C38-10           -339                  03/03/23   12/15/23    MURNANE BUILDING CONTRACTORS        
                                                            C38-2           1,650                  08/29/22     /  /      Murnane Bldg Contrs                 
                                                            C38-6           4,899                  01/20/23   12/12/23    MURNANE BUILDING CONTRACTORS        
 
17-1357   Reconstruction               0-006-019  06/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -9,314                  12/11/20   02/25/21    NORTHEAST PETROLEUM TECHNOLOGIES,INC
 

          Red Mill Elem School:
91-1453   Reconstruction               0-007-003  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1454   Reconstruction               0-007-004  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0945   Reconstruction               0-007-005  03/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0112   Additions and Alterations    0-007-006  09/19/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            20-1          -19,879                  03/13/02   05/28/02    Plank Construction                  
                                                            20-10          19,513                  03/13/02   05/28/02    Plank Construction                  
                                                            20-11           6,342                  03/13/02   04/12/04    Plank Construction                  
                                                            20-12         -11,930                  03/13/02   05/28/02    Plank Construction                  
                                                            20-13           4,787                  03/13/02   04/12/04    Plank Construction                  
                                                            20-14            -650                  03/13/02   06/28/04    Plank Construction                  
                                                            20-15               0                  03/13/02     /  /      Plank Construction                  
                                                            20-16          -6,332                  03/13/02   05/28/02    Plank Construction                  
                                                            20-17              59                  03/13/02   05/28/02    Plank Construction                  
                                                            20-2           49,490                  03/13/02   06/21/04    Plank Construction                  
                                                            20-3           -3,518                  03/13/02   04/12/04    Plank Construction                  
                                                            20-4                0                  03/13/02     /  /      Plank Construction                  
                                                            20-5                0                  03/13/02     /  /      Plank Construction                  
                                                            20-6           19,696                  03/13/02   04/12/04    Plank Construction                  
                                                            20-7            9,698                  03/13/02   04/12/04    Plank Construction                  
                                                            20-8           15,644                  03/13/02   04/12/04    Plank Construction                  
                                                            20-9            4,790                  03/13/02   05/28/02    Plank Construction                  
                                                            21-1           15,760                  03/13/02   04/30/04    Albany Steel                        
                                                            21-2                0                  03/13/02   06/28/04    Albany Steel                        
                                                            21-3           -4,900                  03/13/02   05/28/02    Albany Steel                        
                                                            22-1             -193                  03/13/02   05/28/02    MACC Enterprises                    
                                                            22-2                0                  03/13/02   04/30/04    MACC Enterprises                    
                                                            22-3           -3,500                  03/13/02   05/28/02    MACC Enterprises                    
                                                            22-4           -2,605                  03/13/02   05/28/02    MACC Enterprises                    
                                                            22-5           -3,015                  03/13/02   05/28/02    MACC Enterprises                    
                                                            23-1            3,600                  03/13/02   04/30/04    Weather Guard Industries            
                                                            23-2           -5,000                  03/13/02   05/28/02    Weather Guard Industries            
                                                            24-1          -12,955                  03/13/02   05/28/02    Robinson Hall Architectural         
                                                            24-2                0                  03/13/02   04/30/04    Robinson Hall Architectural         
                                                            24-3                0                  03/13/02   04/30/04    Robinson Hall Architectural         
                                                            24-4           -2,925                  03/13/02   05/28/02    Robinson Hall Architectural         
                                                            25-1           -3,000                  04/26/04   04/30/04    Bay State Elevator                  
                                                            26-1           -2,440                  03/12/02   06/21/04    John V. Warren                      
                                                            26-10           2,292                  03/12/02   04/13/04    John V. Warren                      
                                                            26-11           1,249                  03/12/02   06/24/04    John V. Warren                      
                                                            26-2            1,903                  03/12/02   04/30/04    John V. Warren                      
                                                            26-3           -2,586                  03/12/02   04/13/04    John V. Warren                      
                                                            26-4                0                  03/12/02   04/13/04    John V. Warren                      
                                                            26-5                0                  03/12/02   04/13/04    John V. Warren                      
                                                            26-6                0                  03/12/02   04/13/04    John V. Warren                      
                                                            26-7                0                  03/12/02   04/13/04    John V. Warren                      
                                                            26-8              392                  03/12/02   04/13/04    John V. Warren                      
                                                            26-9            1,451                  03/12/02   04/13/04    John V. Warren                      
                                                            27-1            3,416                  03/12/02   06/21/04    DiGesare Mech.                      
                                                            27-10          -1,394                  03/12/02   06/28/04    DiGesare Mech.                      
                                                            27-11            -100                  06/01/04   06/02/04    DiGesare Mech.                      
                                                            27-2                0                  03/12/02   04/30/04    DiGesare Mech.                      
                                                            27-3            1,472                  03/12/02   04/13/04    DiGesare Mech.                      
                                                            27-4                0                  03/12/02   04/13/04    DiGesare Mech.                      
                                                            27-5             -193                  03/12/02   04/13/04    DiGesare Mech.                      
                                                            27-6             -299                  03/12/02   04/13/04    DiGesare Mech.                      
                                                            27-7            9,337                  03/12/02   04/13/04    DiGesare Mech.                      
                                                            27-8                0                  03/12/02   06/28/04    DiGesare Mech.                      
                                                            27-9                0                  03/12/02   04/13/04    DiGesare Mech.                      
                                                            28-1                0                  03/12/02   04/30/04    Weisburgh Mech.                     
                                                            28-10           1,151                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-11             242                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-12             386                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-13              48                  03/12/02   06/02/04    Weisburgh Mech.                     
                                                            28-2                0                  03/12/02   06/28/04    Weisburgh Mech.                     
                                                            28-3                0                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-4              193                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-5                0                  03/12/02   04/19/04    Weisburgh Mech.                     
                                                            28-6                0                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-7              876                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-8                0                  03/12/02   04/13/04    Weisburgh Mech.                     
                                                            28-9            4,251                  03/12/02   06/21/04    Weisburgh Mech.                     
                                                            29-1              500                  03/13/02   04/26/04    USA Remedation                      
                                                            29-3                0                  03/13/02   05/28/02    USA Remedation                      
                                                            29-4            2,100                  03/13/02   05/28/02    USA Remediation                     
                                                            29-5            3,771                  03/13/02   05/28/02    USA Remediation                     
                                                            29-6             -958                  03/13/02   05/28/02    USA Remediation                     
 
00-1454   Reconstruction               0-007-007  04/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  12/13/02   01/10/03    Gen. Elec. Systems                  
                                                            1                   0                  12/13/02   01/10/03    S&L Roofing                         
                                                            3-3C            3,272                  07/30/04   09/23/04    Gen. Elec. Systems                  
                                                            SS01-1         -2,700                  01/13/03   02/12/03    S&L Roofing                         
                                                            SS03-1         -1,109                  12/13/02   01/10/03    Gen. Elec. Systems                  
                                                            SS03-4B        32,007                  02/12/06   06/20/06    general Electrical Systems          
 
04-1385   Reconstruction               0-007-008  10/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            SS05-1A        -1,700                  03/14/07   08/01/07    Life safety Engineered              
                                                            SS05-1B        -2,240                  03/14/07   08/01/07    Life Safeth Engineered Systems      
                                                            SS05-1C        -3,804                  03/14/07   08/01/07    Life Safety Engineered              
                                                            SS05-1E        -4,034                  03/14/07   08/01/07    Life safety Engineered              
                                                            SS05-2A          -883                  03/14/07   08/01/07    Life Safeth Engineered Systems      
 
07-1926   Reconstruction               0-007-009  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG06-1          1,050                  01/26/10   02/23/10    BAST HATFIELD INC                   
 
13-0351   Reconstruction               0-007-010  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-14             824                  02/09/15   06/17/15    Jersen Construction Group           
                                                            01-18               0                  02/09/15   06/17/15    Jersen Construction Group           
                                                            01-2            1,786                  02/09/15   06/17/15    Jersen Construction Group           
                                                            01-21            -961                  02/09/15   06/17/15    Jersen Construction Group           
                                                            02A-1          -3,758                  11/25/14   02/06/15    S & L Roofing Sheet Metal, Inc.     
                                                            05-15             306                  01/06/15   02/05/15    Carey Electric                      
                                                            05-5            6,034                  01/06/15   02/05/15    Carey Electric                      
 
13-1528   Reconstruction               0-007-011  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-15          16,563                  02/03/16   04/15/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-16          19,827                  02/03/16   04/15/16    BUNKOFF CONTRACTORS INC             
                                                            09-20           1,024                  02/03/16   02/09/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-29           1,431                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-40           2,585                  10/17/16   11/01/16    Bunkoff General Contractors, Inc.   
                                                            09-8           14,417                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            10-10             343                  12/18/15   01/15/16    TRI-VALLEY PLUMBING & HEATING       
                                                            11-2            5,019                  10/28/15   12/02/15    Tri-Valley Plumbing & Heating       
                                                            11-4            2,197                  12/18/15   01/15/16    TRI-VALLEY PLUMBING & HEATING       
                                                            12-2           -9,946                  12/18/15   01/15/16    HAROLD R CLUNE INC                  
 
18-0541   Reconstruction               0-007-012  09/23/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            21-27          55,287                  10/12/22     /  /      Riverview Const Assocs Inc          
                                                            C21-09          1,531                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-1           7,883                  05/26/21   06/30/21    Riverview Construction Associates   
                                                            C21-11          4,544                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-13         21,944                  11/18/22   12/09/22    Riverview Const Assoc Inc           
                                                            C21-15          4,658                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-16          5,942                  01/27/22   02/01/23    Riverview Const Assoc Inc           
                                                            C21-19         -3,500                  01/27/22   02/01/23    Riverview Const Assoc Inc           
                                                            C21-20         -4,250                  01/27/22   02/01/23    Riverview Const Assoc Inc           
                                                            C21-25         17,308                  10/12/22   12/18/23    Riverview Const Assocs Inc          
                                                            C21-26            899                  10/12/22   12/18/23    Riverview Const Assocs Inc          
                                                            C21-28         -3,500                  10/31/22   12/13/23    Riverview Const Assocs Inc          
                                                            C21-4          13,646                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-5          13,539                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C24-2             644                  01/27/22   11/30/22    BPI Mech Serv Inc                   
                                                            C24-7         -25,366                  05/26/22   04/10/23    BPI Mech Serv Inc                   
                                                            C24-9           3,682                  10/31/22   11/15/23    BPI Mech Services Inc               
                                                            C25-13         -2,000                  02/14/22   02/13/23    Harold Clune Inc                    
                                                            C25-2           9,460                  05/26/21   07/30/21    Harold R. Clune Inc                 
                                                            C25-6           6,420                  01/27/22   11/30/22    Harold Clune Inc                    
                                                            C25-8           1,144                  01/27/22   01/27/23    Harold Clune Inc                    
 

          Bell Top School:
91-1455   Reconstruction               0-008-003  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1456   Reconstruction               0-008-004  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0946   Reconstruction               0-008-005  03/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0623   Additions and Alterations    0-008-006  03/02/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            47-1          -16,976                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-10               0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-11               0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-12          -4,006                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-13          -1,500                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-14               0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-15               0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-16             116                  02/25/02   06/24/04    Bast Hatfield                       
                                                            47-17         -13,000                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-2                0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-4                0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-5                0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-6              266                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-7             -730                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-8           -2,010                  02/25/02   04/04/02    Bast Hatfield                       
                                                            47-9                0                  02/25/02   04/04/02    Bast Hatfield                       
                                                            48-1                0                  02/25/02   04/04/02    STS Steel, Inc                      
                                                            48-2                0                  02/25/02   04/04/02    STS Steel, Inc                      
                                                            48-3           -4,654                  02/25/02   04/04/02    STS Steel,Inc                       
                                                            49-1            2,040                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            49-2                0                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            49-3                0                  02/25/02     /  /      Universal Custom Millwork           
                                                            49-4           -1,000                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            49-5           -1,000                  02/25/02   04/04/02    Universal Custsom Millwork          
                                                            49-6           -4,110                  02/25/02   04/04/02    Universal Custom Millwork           
                                                            50-1                0                  02/25/02   04/04/02    Weather Guard Industries, Inc       
                                                            50-2                0                  02/25/02   04/04/02    Weather Guard Industries, Inc       
                                                            50-3           -3,457                  02/25/02   04/04/02    Weather Guard Industries, Inc       
                                                            51-1           -2,869                  02/25/02   04/04/02    CS Architectural Products, Inc      
                                                            51-2                0                  02/25/02   04/04/02    CS Architectural Products,Inc       
                                                            51-3                0                  02/25/02   04/04/02    CS Architectural Products,Inc       
                                                            51-4             -479                  02/25/02   04/04/02    CS Architectural Products, Inc      
                                                            52-1           -3,000                  02/25/02   04/04/02    Bay State Elevator                  
                                                            53-1             -534                  03/12/02   05/24/02    Mazone Plumbing                     
                                                            53-10               0                  03/12/02     /  /      Mazone Plumbing                     
                                                            53-2                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            53-3                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            53-4                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            53-5                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            53-6              779                  03/12/02   06/02/04    Mazone Plumbing                     
                                                            53-7                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            53-8                0                  03/12/02     /  /      Mazone Plumbing                     
                                                            53-9           -4,117                  03/12/02   05/24/02    Mazone Plumbing                     
                                                            54-1           -1,000                  03/12/02   05/24/02    Crisafulli Bros.                    
                                                            54-2                0                  03/12/02     /  /      Crisafulli Bros.                    
                                                            54-3              -97                  03/12/02   06/02/04    Crisafulli Bros.                    
                                                            54-4                0                  03/12/02     /  /      Crisafulli Bros                     
                                                            54-5             -666                  03/12/02   06/02/04    Crisafulli Bros                     
                                                            54-6                0                  03/12/02     /  /      Crisafulli Bros                     
                                                            54-7           -5,470                  03/12/02   05/24/02    Crisafulli Bros.                    
                                                            55-1             -568                  03/12/02   06/24/04    Justin Electrical                   
                                                            55-10               0                  03/12/02     /  /      Justin Electrical                   
                                                            55-11             332                  03/12/02   06/02/04    Justin Electrical                   
                                                            55-2                0                  03/12/02     /  /      Justin Electrical                   
                                                            55-3                0                  03/12/02     /  /      Justin Electrical                   
                                                            55-4                0                  03/12/02     /  /      Justin Electrical                   
                                                            55-5                0                  03/12/02     /  /      Justin Electrical                   
                                                            55-6                0                  03/12/02     /  /      Justin Electrical                   
                                                            55-7                0                  03/12/02     /  /      Justin Electrical                   
                                                            55-8                0                  03/12/02     /  /      Justin Electrical                   
                                                            55-9                0                  03/12/02     /  /      Justin Electrical                   
                                                            56-1                0                  02/25/02   04/04/02    Magnum Services                     
                                                            56-2                0                  02/25/02   04/04/02    Magnum Services                     
                                                            56-3                0                  02/25/02     /  /      Magnum Services                     
                                                            56-4             -779                  02/25/02   04/04/02    Magnum Services                     
                                                            56-5           13,877                  02/25/02   04/04/02    Magnum Services                     
                                                            56-6            6,161                  02/25/02   04/04/02    Magnum Services                     
                                                            57-1              -97                  03/12/02   05/24/02    Adirondack Cabling                  
                                                            57-2                0                  03/12/02     /  /      Adirondack Cabling                  
                                                            57-3           -1,780                  03/12/02   05/24/02    Adirondack Cabling                  
 
00-1455   Reconstruction               0-008-007  04/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  01/13/03   02/12/03    Weisburgh Mech.                     
                                                            AD-1                0                  12/13/02   01/10/03    S&L Roofing                         
                                                            SS01-1           -975                  01/13/03   02/12/03    S&L Roofing                         
                                                            SS02-1          3,849                  01/13/03   02/12/03    Weisburgh Mech.                     
                                                            ss03-3A         3,272                  07/30/04   09/23/04    Gen. Elec. Systems                  
 
04-1386   Reconstruction               0-008-008  10/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            SS05-2E          -883                  03/14/07   08/01/07    Life safeth Engineered              
 
07-1927   Reconstruction               0-008-009  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC06-5          1,050                  01/26/10   02/23/10    BAST HATFIELD INC                   
                                                            EG06-14        23,522                  03/09/11   03/28/11    BAST HATFIELD INC                   
 
13-0352   Reconstruction               0-008-010  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            01-13             450                  02/09/15   03/24/15    Jersen Construction Group           
                                                            01-15           2,257                  02/09/15   03/24/15    Jersen Construction Group           
                                                            01-24          -2,007                  02/09/15   03/24/15    Jersen Construction Group           
                                                            01-6            1,786                  02/09/15   03/24/15    Jersen Construction Group           
                                                            02A-3          -1,726                  11/25/14   02/06/15    S & L Roofing & Sheetmetal, Inc.    
                                                            05-10           3,895                  01/06/15   02/05/15    Carey Electric                      
                                                            05-21           1,569                  03/19/15   03/27/15    Carey Electric                      
                                                            05-8            3,757                  01/06/15   02/05/15    Carey Electric                      
 
13-1529   Reconstruction               0-008-011  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-10           7,637                  02/03/16   04/18/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-17           3,210                  02/03/16   04/15/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-22           6,662                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-5            4,255                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            10-9              310                  12/18/15   01/15/16    TRI-VALLEY PLUMBING & HEATING       
                                                            12-5            2,409                  12/18/15     /  /      HAROLD R CLUNE ING                  
                                                            12-7              906                  06/03/16   07/07/16    HAROLD R CLUNE                      
 
14-0698   Reconstruction               0-008-012  08/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0653   Reconstruction               0-008-013  01/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A01-3         -31,923                  12/20/16   12/22/16    Bunkoff General Contractors, Inc.   
 
20-0367   Reconstruction               0-008-014  02/16/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            31-21          28,548                  10/13/22   12/18/23    Murnane Bldg Contrs                 
                                                            C-31-47           687                  05/02/23   12/28/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-15          1,283                  05/26/22   01/30/23    Murnane Bldg Contrs                 
                                                            C31-24         13,923                  10/13/22   12/13/23    Murnane Bldg Contrs                 
                                                            C31-26          8,303                  01/03/23   09/19/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-32          5,070                  01/03/23   12/11/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-35          5,117                  01/03/23   12/11/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-36         20,934                  02/02/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-43          7,413                  03/03/23   12/15/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-9             706                  06/07/23   12/27/23    MURBABE BUILDING CONTRACTORS        
                                                            C33-1           2,622                  06/07/23   12/27/23    COLLETT MECHANCIAL                  
                                                            C34-6           1,822                  02/02/23     /  /      T MCELLIGOTT INC                    
                                                            C34-9           4,088                  02/02/23   11/29/23    T MCELLIGOTT INC                    
                                                            C35-1           8,414                  08/26/21     /  /      Schenectady Hardware&Electric, Inc  
                                                            C35-1           8,414                  02/10/23   12/11/23    SCHENECTADY HARDWARE & ELEC INC     
                                                            C35-10          2,246                  06/07/23   12/27/23    SCHENECTADY HARDWARE & ELECTRIC     
                                                            C35-14          8,745                  07/25/22   05/09/23    Schenectady Hardware&Elec Inc       
                                                            C35-21          4,239                  10/13/22   05/16/23    Schentady Hardware&Elec Inc         
                                                            C35-30          1,030                  01/03/23   10/19/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-31          3,356                  02/02/23   11/29/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-40          1,307                  05/02/23   12/28/23    SCHENECTADY HARDWARE & ELECTRIC     
                                                            C36-4           8,668                  12/03/21   05/16/23    HMA Contrg Corp                     
 

          Columbia High School:
91-1457   Reconstruction               0-009-003  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1467SR Additions and Alterations    0-009-005  10/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            CH14-1              0                  11/03/05   05/05/06    SRI FIRE SPRINKLER CORP.            
                                                            CH14-2            448                  11/03/05   05/05/06    SRI FIRE SPRINKLER CORP.            
 
01-0608   Additions and Alterations    0-009-005  11/12/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            06-4              858                  03/24/06   06/30/06    Delhi Steel Corp                    
                                                            07-2            1,761                  03/24/06     /  /      Sand L roofing Sheemetal            
                                                            07-4            2,761                  03/24/06     /  /      S and L roofing Sheetmetal          
                                                            07-6            8,509                  03/24/06     /  /      Sand L Roofing Sheetmetal           
                                                            08-2              349                  06/07/05   07/21/05    Patriot Glass and Mirror            
                                                            09-1             -980                  03/24/06     /  /      Universal Custom Millwork           
                                                            09-2           -3,030                  03/24/06     /  /      Universal Custom Millwork           
                                                            09-3           11,233                  03/24/06   06/30/06    Universal Custom millwork           
                                                            09-4              825                  03/24/06   06/30/06    universal Custom Millwork           
                                                            09-5            3,680                  03/24/06   06/30/06    Universal custom Millwork           
                                                            09-6            9,845                  03/24/06   06/30/06    universal custom millwork           
                                                            09-9             -875                  03/24/06   06/30/06    Universal Custom Millwork           
                                                            1              10,000                  12/13/02   01/10/03    B. Anthony Const.                   
                                                            1               7,554                  12/13/02   01/10/03    B. Anthony Const.                   
                                                            1               2,500                  12/13/02   01/10/03    Stilsing Elec.                      
                                                            11-1            2,619                  03/24/06   06/30/06    Barber Marketing                    
                                                            12-1           -2,000                  03/24/06   06/30/06    Bay State Elevator                  
                                                            13-11          -2,794                  03/24/06     /  /      Adams Plumbing Heating              
                                                            13-4           19,146                  03/24/06   06/20/06    Adams Plumbing Heating              
                                                            13-5           10,696                  03/24/06     /  /      Adams Plumbing heating              
                                                            13-6          131,171                  04/24/06     /  /      Adams Plumbing Heating              
                                                            13-7            3,945                  03/24/06   06/14/06    Adams Plumbing heating              
                                                            16-11             582                  03/29/06   06/16/06    General Electrical Systems          
                                                            16-13          11,035                  03/29/06     /  /      Generak Electrical Systems          
                                                            16-20           4,583                  06/30/06     /  /      General Electric                    
                                                            16-3            5,193                  03/29/06   06/16/06    General Electrical Systems          
                                                            16-4            7,682                  03/29/06   06/16/06    General Electrical Systems          
                                                            16-5           36,984                  03/29/06   06/16/06    General Electrical Systems          
                                                            16-6              386                  03/29/06   06/16/06    general Electrical Systems          
                                                            16-7           23,641                  03/29/06   06/16/06    General Electrical Systems          
                                                            16-8           18,489                  03/29/06     /  /      General Electrical Systems          
                                                            2                 472                  12/13/02   01/10/03    B. Anthony Const.                   
                                                            2                -893                  03/07/07   03/13/07    Gross Electric                      
                                                            3               1,974                  01/13/03   02/12/03    B. Anthony Const.                   
                                                            CH-13-9         9,831                  12/23/05   12/29/05    Adams Plumbing                      
                                                            CH-20-3         6,080                  12/07/05     /  /      gallo Construction                  
                                                            CH01-1         12,985                  12/13/02   01/10/03    B. Anthony Const.                   
                                                            CH01-2          8,963                  01/13/03   02/12/03    B. Anthony Const.                   
                                                            CH01-3          1,328                  10/03/03   10/07/03    B. Anthony Const.                   
                                                            CH02-1          4,373                  12/13/02   01/10/03    Stilsing Elec.                      
                                                            CH04-1        -64,991                  09/07/04   09/24/04    Rifenburg Const.                    
                                                            CH04-2          7,446                  03/06/06   06/30/06    Rifenberg Construction              
                                                            CH04-3          2,400                  11/21/05   02/13/06    rifenburg Construction              
                                                            CH05-1         -7,280                  10/29/03   11/18/03    MLB Industries                      
                                                            CH05-2         13,500                  06/21/04   06/22/04    MLB Industries                      
                                                            CH05-3         -3,515                  03/06/06   06/30/06    MLB Industries                      
                                                            CH05-4         19,888                  03/06/06   06/30/06    MLB Industries                      
                                                            CH05-5           -167                  12/28/07   02/23/08    MLB Industries                      
                                                            CH06 R-3        1,400                  01/05/07   01/30/07    North Anmerican Specialty Insurance 
                                                            CH06-1         37,200                  11/28/03   12/26/03    Delhi Steel                         
                                                            CH06-2          2,984                  04/06/06   06/30/06    Delhi Steel Corp                    
                                                            CH06-3          8,678                  02/01/07   02/22/07    Delhi Steel Corp                    
                                                            CH06-5          2,576                  02/01/07   02/22/07    Delhi Steel                         
                                                            CH06-8        -31,832                  02/28/07   03/13/07    Delhi Steel Corp                    
                                                            CH06R-2           465                  01/05/07   01/30/07    North American Specialty            
                                                            CH06R-4         3,089                  02/01/07   02/22/07    North American Specialty            
                                                            CH06R-5        -2,340                  01/05/07     /  /      North America Specialty             
                                                            CH06R-5        -2,340                  03/20/08     /  /      NORTH AMERICAN SPECIALTY INSURANCE C
                                                            CH07-1          8,507                  09/07/04   09/24/04    S&L Roofing                         
                                                            CH07-2          1,761                  03/20/08   04/02/08    S & L ROOFING & SHEETMETAL, INC.    
                                                            CH07-3         14,056                  04/20/07   05/15/07    S and L Plumbing                    
                                                            CH07-4          2,761                  03/20/08   04/02/08    S & L ROOFING & SHEETMETAL, INC.    
                                                            CH07-5            680                  05/14/07   05/15/07    S and L Roofing and Sheetmetal      
                                                            CH07-6          8,509                  03/20/08   04/02/08    S & L ROOFING & SHEETMETAL, INC.    
                                                            CH07-7           -615                  07/02/07   07/17/07    S and L Roofing Sheetmetal          
                                                            CH08-1          2,477                  03/06/06   06/30/06    patriot Glass and Mirror            
                                                            CH08-4          2,656                  04/13/06   06/26/06    Patriot Glass and Mirror            
                                                            CH08-5         -8,353                  12/12/06   01/30/07    Patriot Glass and Mirror            
                                                            CH09-1           -980                  03/20/08   04/02/08    UNIVERSAL CUSTOM MILLWORK, INC.     
                                                            CH09-10         1,620                  04/20/07   05/15/07    Universal Custom Millwork           
                                                            CH09-11          -610                  11/25/05   02/10/06    Universal Custom Millwork           
                                                            CH09-12        -7,500                  12/01/06   01/12/07    Universal Custom Millwork           
                                                            CH09-2         -3,030                  03/20/08   04/02/08    UNIVERSAL CUSTOM MILLWORK, INC.     
                                                            CH09-7           -920                  04/20/07   05/15/07    Universal Custom Millwork           
                                                            CH09-8         -3,105                  03/20/08   04/02/08    UNIVERSAL CUSTOM MILLWORK, INC.     
                                                            CH10-1         19,893                  07/08/04   07/19/04    Nickerson Corp                      
                                                            CH10-2            597                  02/01/07   02/22/07    Nickerson Corp                      
                                                            CH10-3         -4,312                  04/20/07   05/15/07    Nickerson Corp                      
                                                            CH10-4           -597                  01/05/07   01/30/07    Nickerson Corp                      
                                                            CH10-5        -35,650                  01/05/07   01/30/07    Nickerson Corp                      
                                                            CH10-6         -1,000                  01/05/07   01/30/07    Nicerson Corp                       
                                                            CH11-2         -3,275                  06/30/05   07/19/05    Barber Marketing                    
                                                            CH13-1          1,983                  01/28/04   02/25/04    Adams Plumbing                      
                                                            CH13-11        -2,794                  03/20/08     /  /      ADAMS PLUMBING & HEATING, INC.      
                                                            CH13-2          2,906                  03/24/06   06/14/06    7dams Plumbing Heating              
                                                            CH13-3         12,746                  03/24/06   06/14/06    Adams Plumbing Heating              
                                                            CH13-5         10,696                  03/20/08     /  /      ADAMS PLUMBING & HEATING, INC.      
                                                            CH13-6        131,171                  03/20/08     /  /      ADAMS PLUMBING & HEATING, INC.      
                                                            CH13-8         -1,231                  06/06/07   10/23/07    Adams Plumbing heating              
                                                            CH14-3         -1,350                  12/01/06   01/12/07    SRI Fire Sprinkler Corp             
                                                            CH15-1          2,884                  03/24/06   06/14/06    Adams Plumbing heating              
                                                            CH15-2          1,463                  03/24/06   06/14/06    Adams Plumbing heating              
                                                            CH15-3         59,134                  03/24/06     /  /      Adams Plumbing heating              
                                                            CH15-3         59,134                  03/20/08     /  /      ADAMS PLUMBING & HEATING, INC.      
                                                            CH15-4        -25,911                  12/01/06   01/09/07    Adams Plumbing heating              
                                                            CH15-5        -10,000                  05/10/07   07/27/07    Adams Plumbing heating              
                                                            CH16-           3,122                  04/13/06     /  /      General Electrical Systems          
                                                            CH16-1          3,354                  07/08/04   07/19/04    General Elec. Systems               
                                                            CH16-12         1,231                  06/02/06   06/16/06    General Electrical Systems          
                                                            CH16-13        11,035                  03/20/08     /  /      GENERAL ELECTRICAL SYSTEMS, INC.    
                                                            CH16-14         7,374                  03/29/06   06/16/06    General Electrical Systems          
                                                            CH16-15        11,669                  03/29/06   06/16/06    General Electrical Systems          
                                                            CH16-17           602                  11/17/05   05/26/06    General Electric Systems            
                                                            CH16-18        42,705                  11/21/05   05/26/06    General Electrical systems          
                                                            CH16-19         7,198                  04/20/07   05/29/07    General Electrical Systems          
                                                            CH16-2         51,551                  09/07/04   09/24/04    General Elec. Systems               
                                                            CH16-20         4,583                  03/20/08     /  /      GENERAL ELECTRICAL SYSTEMS, INC.    
                                                            CH16-21           914                  02/01/07   02/09/07    General Electrical                  
                                                            CH16-21           914                  03/20/08     /  /      GENERAL ELECTRICAL SYSTEMS, INC.    
                                                            CH16-40         5,753                  03/20/08     /  /      GENERAL ELECTRICAL SYSTEMS, INC.    
                                                            CH16-8         18,489                  03/20/08     /  /      GENERAL ELECTRICAL SYSTEMS, INC.    
                                                            CH16-9          3,122                  05/19/06   06/26/06    General Electrical Systems          
                                                            CH17-1          1,658                  03/29/06   06/16/06    Nistel LLC                          
                                                            CH17-2          1,110                  03/29/06   06/16/06    Nistel LLc                          
                                                            CH17-3            415                  03/29/06   06/16/06    Nistel LLC                          
                                                            CH17-4           -610                  06/06/06   06/23/06    Nistel                              
                                                            CH20-1          1,556                  03/29/06   06/16/06    Gallo Construction                  
                                                            CH20-4         -1,804                  03/02/06   07/21/06    Gallo Construction                  
                                                            CH21-1         -1,000                  03/10/06   06/23/06    Crisafulli brothers                 
                                                            CH22-1            466                  03/02/06   06/20/06    General Mechanical                  
                                                            CH22-3         -2,485                  11/21/05   05/26/06    General mechanical Systems          
                                                            CH22-4         -1,500                  03/10/06   06/23/06    General Mechanical Systems          
                                                            CH24-1          2,989                  02/01/07   02/09/07    Gross Electric                      
                                                            CH25-1         -5,000                  03/14/07   08/01/07    Life Safeth Engineered              
                                                            CH25-2         -5,000                  03/14/07   08/01/07    Life safeth Engineered Systems      
                                                            CH6-6           6,904                  02/28/07   03/13/07    Delhi steel Corp                    
                                                            CH6-7          -8,273                  02/28/07   03/13/07    Delhi Steel Corp                    
                                                            CH6-9             478                  02/28/07   03/13/07    Delhi Steel Corp                    
                                                            Ch-13-10       13,664                  12/23/05   12/29/05    Adams Plumbing Heating              
                                                            Ch03-1        -10,916                  10/06/05   10/13/05    Project Development                 
                                                            Ch08-03          -579                  06/30/05   07/19/05    Patriot Glass and Mirror            
                                                            Ch16-10         5,753                  04/13/06     /  /      General Electrical Systems          
                                                            Ch16-16         1,783                  10/06/05   10/13/05    General Electrical systems          
                                                            Ch20-2          1,714                  12/05/05     /  /      gallo Construction                  
                                                            Ch22-2          2,190                  08/25/05   08/29/05    General Mechanical systems          
 
07-0154   Reconstruction               0-009-006  10/31/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG01-1          1,379                  12/23/08   04/03/09    SHAKER FLATS LANDSCAPING COMPANY    
                                                            EG02-1         -1,000                  01/16/09   07/07/09    CRISAFULLI BROTHERS, INC.           
                                                            EG03-1         -2,200                  01/16/09   07/07/09    FAMLILY DANZ HATING & A/C, INC.     
                                                            EG04-1            -38                  01/16/09   07/07/09    FARINA ELECTRIC, INC.               
 
07-1921   Reconstruction               0-009-007  01/14/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0797   Reconstruction               0-009-009  03/17/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG14-1            381                  11/01/11   01/24/12    BAST HATFIELD INC                   
 
12-1200   Reconstruction               0-009-010  11/08/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0353   Reconstruction               0-009-011  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-19             893                  02/09/15   03/23/15    Jersen Construction Group           
                                                            01-5           15,743                  02/09/15   03/23/15    Jersen Construction Group           
                                                            01-8              451                  02/09/15   03/23/15    Jersen Construction Group           
                                                            05-11           1,463                  01/06/15   02/05/15    Carey Electric                      
                                                            05-3              963                  01/06/15   02/05/15    Carey Electric                      
                                                            05-9            1,809                  01/06/15   02/05/15    Carey Electric                      
 
13-1530   Reconstruction               0-009-012  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-14               0                  02/03/16   04/15/16    BUNKOFF GENERAL CONTRACTORS INC     
                                                            09-30           7,886                  06/03/16   07/07/16    BUNKOFF GENERAL CONTRACTORS         
                                                            09-37          -7,835                  07/18/17   08/15/17    Bunkoff General Contractors, Inc.   
                                                            09-43          12,503                  10/05/16   12/19/16    Bunkoff General Contractors, Inc.   
                                                            09-44          10,755                  10/05/16   12/19/16    Bunkoff General Contractors, Inc.   
                                                            09-45           3,833                  12/20/16   01/17/17    Bunkoff General Contractors, Inc.   
                                                            09-48             500                  12/20/16   01/17/17    Bunkoff General Contractors, Inc.   
                                                            09-7           19,475                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            09-9            1,200                  10/28/15   01/15/16    Bunkoff General Contractors, Inc.   
                                                            10-14             846                  12/20/16   01/06/17    Tri-Valley Plumbing & Heating       
                                                            10-18            -150                  01/19/17   07/11/17    Tri-Valley Plumbing & Heating       
                                                            10-20             908                  01/19/17   01/19/17    Tri-Valley Plumbing & Heating       
                                                            10-5            8,519                  10/28/15   01/15/16    Tri-Valley Plumbing & Heating       
                                                            11-10          13,112                  11/22/16   01/06/17    Tri-Valley Plumbing & Heating       
                                                            11-11           1,508                  12/20/16   01/06/17    Tri-Valley Plumbing & Heating       
                                                            11-12            -150                  01/19/17   01/19/17    Tri-Valley Plumbing & Heating       
                                                            12-10          -4,511                  10/27/16   12/12/16    Harold R. Clune, Inc.               
                                                            12-11           9,735                  12/20/16   01/06/17    Harold R. Clune, Inc.               
                                                            12-15            -200                  12/20/16   01/17/17    Harold R. Clune, Inc.               
                                                            12-6           10,999                  06/03/16   07/07/16    HAROLD R CLUNE                      
 
14-0190   Reconstruction               0-009-013  10/23/14  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0368   Reconstruction               0-009-014  02/16/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C31-10         12,278                  05/26/22   01/30/23    Murnane Bldg Contrs                 
                                                            C31-12         24,155                  05/26/22   01/30/23    Murnane Bldg Contrs                 
                                                            C31-22          2,928                  10/13/22   12/13/23    Murnane Bldg Contrs                 
                                                            C31-25         59,425                  10/13/22   12/18/23    Murnane Bldg Contrs                 
                                                            C31-28          6,616                  01/03/23   12/15/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-3          16,799                  11/18/21   12/01/22    Murnane Bldg Contrs                 
                                                            C31-30         21,957                  01/03/23   12/11/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-38         13,177                  02/02/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-40         16,327                  02/02/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            C31-44         -1,844                  03/03/23   12/15/23    MURNANE BUIDLING CONTRACTORS        
                                                            C31-7           3,243                  02/09/22   12/01/22    Murnane Building Contractors        
                                                            C32-1          31,050                  02/14/22   12/01/22    Monahan&Loughlin LLC                
                                                            C32-2           2,932                  05/26/22   01/30/23    Monahan&Loughlin LLC                
                                                            C32-3           3,900                  03/03/23   12/15/23    MONAHAN & LOUGHLIN LLC              
                                                            C34-1          56,021                  01/27/22   01/27/23    T. McElligott Inc.                  
                                                            C34-2           4,069                  10/13/22   05/16/23    T. McElligott Inc.                  
                                                            C35-13         -2,000                  05/26/22   04/10/23    Schenectady Hardware&Elec Inc       
                                                            C35-17          6,013                  07/25/22   05/04/23    Schenectady Hardware&Elec Inc       
                                                            C35-25          1,260                  10/13/22   05/16/23    Schenectady Hardware&Elec Inc       
                                                            C35-26         -4,738                  01/03/23   10/19/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-33            845                  02/02/23   11/29/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-34          3,737                  02/02/23   11/29/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-36          2,399                  03/03/23   12/14/23    SCHENECTADY HARDWARE & ELECTRIC INC 
                                                            C35-37         16,107                  06/07/23   12/27/23    SCHENECTADY HARDWARE & ELECTRIC     
                                                            C35-39         20,052                  06/07/23   12/27/23    SCHENECTADY HARDWARE & ELECTRIC     
                                                            C35-41            944                  06/07/23   12/27/23    SCHENECTADY HARDWARE & ELECTRIC     
                                                            C35-5          22,248                  11/26/21   12/15/22    Schtdy Hardware&Elec Inc            
                                                            C35-6          28,996                  11/26/21   12/15/22    Schdy Hardware&Electric Inc         
                                                            C35-7           8,853                  02/09/22   11/30/22    Schenectady Hardware&Elec Inc       
                                                            C35-9           1,393                  05/26/22   04/10/23    Schenectady Hardware&Elec Inc       
                                                            C36-11         10,164                  09/15/22   10/03/23    HMA Contr Corp                      
                                                            C36-12          1,360                  09/15/22   10/03/23    HMA Contr Corp                      
                                                            C36-15          3,370                  09/15/22   12/11/23    HMA Contrg Corp                     
                                                            C36-15          3,370                  01/03/23     /  /      HMA CONTRACTING CORP                
                                                            C36-18          2,677                  01/03/23   12/11/23    HMA CONTRACTING CORP                
                                                            C36-2           6,736                  11/08/21   12/12/22    HMA Contracting Corp                
                                                            C36-21         15,522                  01/03/23   12/11/23    HMA CONTRACTING CORP                
                                                            C36-28          7,614                  01/03/23   12/11/23    HMA CONTRACTING CORP                
                                                            C36-3          26,776                  11/26/21   12/15/22    HMA Contr Corp                      
                                                            C36-30        -13,840                  02/02/23   12/18/23    HMA CONTRACTING                     
                                                            C36-31              0                  03/03/23   12/15/23    HMA CONTRACTING CORP                
                                                            C36-5          21,678                  12/03/21   09/20/22    HMA Contr Corp                      
                                                            C36-7          34,340                  05/26/22   01/30/23    HMA Contrg Corp                     
                                                            C37-1           6,895                  11/26/21   12/15/22    Trane US Inc                        
                                                            C37-2          29,843                  11/26/21   12/15/22    Trane US Inc                        
                                                            C37-3           3,859                  01/27/22   01/27/23    Trane US Inc                        
                                                            C37-4           3,859                  01/27/22   01/27/23    Trane US Inc                        
 
18-0507   Reconstruction               0-009-015  02/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            17-01           2,858                  12/11/20   02/25/21    KASCON, LLC                         
 
21-2012   Reconstruction               0-009-016  10/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C42-2           9,948                  05/02/23   12/27/23    HAROLD R. CLUNE                     
                                                            C42-3          16,007                  06/07/23   12/27/23    HAROLD R. CLUNE                     
                                                            C42-4             808                  06/07/23   12/27/23    HAROLD R. CLUNE                     
                                                            C42-5          19,305                  06/07/23   12/27/23    HAROLD R. CLUNE                     
                                                            CO-1           10,669                  05/01/23     /  /      HAROLD R. CLUNE                     
 
02-1442FP Reconstruction               0-009-FP1  08/12/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Learning Barn @ Bell Top Elem.:
96-1404   New Construction             0-019-001  05/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Grounds Shop:
97-1498   Reconstruction               3-012-001  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1928   Reconstruction               3-012-003  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG06-10           548                  04/13/10   05/28/10    BAST HATFIELD INC                   
                                                            EG06-7         23,686                  01/26/10   02/23/10    BAST HATFIELD INC                   
 
13-1531   Reconstruction               3-012-004  12/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-32          -6,028                  07/22/16   09/30/16    Bunkoff General Contractors, Inc.   
                                                            11-1           -2,318                  10/28/15   12/02/15    Tri-Valley Plumbing & Heating       
                                                            12-1            1,897                  10/28/15   12/02/15    Harold R. Clune Inc.                
                                                            12-9            1,220                  06/03/16   07/07/16    HAROLD R CLUNE                      
 
18-0542   Reconstruction               3-012-006  09/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage:
07-1922   Reconstruction               4-011-001  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG06-12        -8,372                  12/03/10   12/28/10    BAST HATFIELD INC                   
 
13-1532   Reconstruction               4-011-002  12/12/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
91-1458   Reconstruction               5-010-002  07/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1616   Reconstruction               5-010-003  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FP1-1           5,072                  06/18/03   06/25/03    Environ. & Fueling Systems          
 
97-1499   Reconstruction               5-010-004  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1567   Reconstruction               5-010-005  11/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02              1,374                  07/17/03   07/24/03    Jenkins Excavating                  
                                                            1                 424                  12/13/02   01/10/03    Gen. Elec. Systems                  
                                                            1                 331                  12/13/02   01/10/03    John Warren                         
                                                            1               1,931                  12/13/02   01/10/03    Jenkins Excavating                  
                                                            2               1,403                  12/13/02   01/10/03    John Warren                         
                                                            2               1,050                  01/13/03   02/12/03    Jenkins Excavating                  
                                                            3                 796                  01/13/03   02/12/03    John Warren                         
                                                            3               5,245                  05/13/03   05/23/03    Jenkins Excavating                  
                                                            4               2,244                  05/13/03   05/23/03    John Warren                         
                                                            AA-1             -346                  06/18/03   06/25/03    DiGesare Mech.                      
                                                            AA-3             -630                  06/18/03   06/25/03    Environ. & Fueling Systems          
                                                            ALLOW-2           250                  07/17/03   07/24/03    Rotterdam Gen. Contracting          
                                                            ALLOW-3        10,865                  07/17/03   07/24/03    Rotterdam Gen. Contracting          
                                                            ALLOW-4         4,415                  08/01/03   08/15/03    Rotterdam General Contracting       
                                                            BG01-1           -800                  12/13/02   01/10/03    Jenkins Excavating                  
                                                            BG01-3          6,958                  10/29/03   11/18/03    Jenkins Excavating                  
                                                            BG02-1        -17,071                  12/13/02   01/10/03    Rotterdam Gen. Contracting          
                                                            BG02-2         -1,649                  05/13/03   05/23/03    Rotterdam Gen. Contracting          
                                                            BG02-3         -3,645                  06/19/03   07/11/03    Rotterdam Gen. Contracting          
                                                            BG02-4            599                  07/17/03   07/24/03    Rotterdam Gen. Contracting          
                                                            BG02-5         -7,500                  06/30/05   07/19/05    Rotterdam General Contracting       
                                                            BG02CA01          470                  05/13/03   05/23/03    Rotterdam Gen. Contracting          
                                                            BG03-1          4,000                  10/03/03   10/07/03    DiGesare Mech.                      
                                                            BG03-2         -2,154                  03/16/05   03/31/05    DiGesare Mechanical                 
                                                            BG04-1           -150                  05/13/03   05/23/03    John Warren                         
                                                            BG04-2          2,053                  03/16/05   04/14/05    John Warren                         
                                                            BG04-3            568                  06/03/04   06/09/04    John Warren                         
                                                            BG04-4           -215                  03/24/06   04/20/06    John Warren                         
                                                            BG05-1        -12,660                  12/13/02   01/10/03    Gen. Elec. Systems                  
                                                            BG05-2         -3,235                  10/29/03   01/06/04    Gen. Elec. Systems                  
                                                            BG05-3        -19,300                  03/24/06   05/23/06    Geneal Electric                     
                                                            BG05-4           -798                  11/03/05   11/21/05    GENERAL ELECTRICAL SYSTEMS, INC.    
 
07-1923   Reconstruction               5-010-006  01/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EG09-4         11,995                  03/09/11   03/28/11    STILSING ELECTRIC INC               
                                                            EG09-5           -348                  10/25/11   08/23/12    STILSING ELECTRIC INC               
 
13-0354   Reconstruction               5-010-007  03/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-23            -624                  02/09/15   03/24/15    Jersen Construction Group           
                                                            01-27          15,300                  03/19/15   03/27/15    Jersen Construction Group           
                                                            03-1              569                  11/25/14   02/06/15    Mazone Plumbing & Heating Inc.      
                                                            03-2          -14,583                  01/23/15   01/29/15    Mazone Plumbing & Heating Inc.      
                                                            05-17          14,338                  01/06/15   02/05/15    Carey Electric                      
                                                            05-18           1,570                  03/19/15   03/27/15    Carey Electric                      
                                                            19-1           -6,469                  06/12/17   11/13/17    John Coyne Electrical Contracting, I
 
13-1533   Reconstruction               5-010-008  12/12/14  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0543   Reconstruction               5-010-009  09/23/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C21-12         -1,087                  11/18/21   12/09/22    Riverview Const Assoc Inc           
                                                            C21-2           9,288                  05/26/21   06/30/21    Riverview Construction Associates   
 
22-2292   Reconstruction               5-010-010  09/22/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            TCC1-3         24,510                  01/20/23   12/21/23    Shaker Flats Landscaping            
                                                            TCC1-4          1,061                  01/20/23   12/21/23    Shaker Flats Lanscaping             
                                                            TCC1-5         14,458                  01/20/23   12/21/23    Shaker Flats Landscaping            
                                                            TCC2-2          1,074                  01/20/23   12/21/23    Stisling Electric                   
                                                            TCC2-3           -352                  01/20/23   12/21/23    Stilsing Elec                       
 

          New Concession Stand @ High School:
03-1034   New Construction             7-021-001  03/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Grandstand/Press Box:
03-1035   New Construction             7-022-001  03/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
98-1375   Reconstruction               7-999-001  08/02/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,916                  12/22/06   01/04/07    A.J. Arpey, Inc.                    
                                                            60-01             773                  12/08/04   12/23/04    Weisburgh Mechanical                
                                                            ECCO-01        -5,325                  12/08/04   12/23/04    Flex Electrical Constructors        
 
14-0277   Reconstruction               7-999-002  05/12/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            15-1          -21,685                  01/06/17   08/23/17    nfrastructure Technologies, Inc.    
                                                            15-2           16,870                  02/13/17   09/14/17    nfrastructure Technologies, Inc.    
                                                            16-1           -9,477                  12/12/16   02/14/17    eClipse Network Solutions           
                                                            17-1             -639                  06/10/16   07/27/16    Family Danz Heating & A/C, Inc.     
                                                            18-1           -1,210                  07/22/16   09/30/16    J. McBain Electric, Inc.            
                                                            18-2            5,012                  12/08/16   12/09/16    J. McBain Electric, Inc.            
 
14-0061   Reconstruction               7-999-003  03/11/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            13-1          -36,248                  01/06/17   01/09/17    The Trane Company                   
 
17-0945   Reconstruction               7-999-005  11/05/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            12-01          12,358                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-02           3,545                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-10           9,233                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-3            5,052                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-4            3,336                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-5           24,694                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-6           12,408                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-7            7,035                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-8            2,031                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            12-9            1,721                  12/11/20   02/25/21    DAY AUTOMATION                      
                                                            15-01           3,591                  12/11/20   02/25/21    ZONES, INC.                         
                                                            15-02          33,671                  12/11/20   02/25/21    ZONES, INC.                         
 

HOOSICK FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-05-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
90-1468   Reconstruction               0-001-003  06/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1469   Reconstruction               0-001-004  06/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0818   Reconstruction               0-001-005  03/16/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0038   Reconstruction               0-001-007  07/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0746   Additions and Alterations    0-001-008  03/25/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -245                  10/28/02   02/05/03    Tougher Industries                  
                                                            1               5,122                  10/28/02   02/05/03    Harold R. Clune                     
                                                            1               1,662                  10/28/02   02/05/03    Adirondack Cabling                  
                                                            1               6,193                  10/28/02   02/05/03    SNK Enterprises                     
                                                            1                -245                  10/28/02   02/05/03    V&B Mechanical                      
                                                            1              -1,886                  10/28/02   02/05/03    ABCO Multi-Trades                   
                                                            1                -500                  12/12/02   02/18/03    Standard Northeast                  
                                                            2             -11,671                  10/28/02   02/05/03    Tougher Industries                  
                                                            2               1,950                  10/28/02   02/05/03    Harold R. Clune                     
                                                            2               9,980                  10/28/02   02/05/03    SNK Enterprises                     
                                                            2              -8,732                  10/28/02   02/05/03    V&B Mechanical                      
                                                            2             -10,000                  12/12/02   02/18/03    MARS, Inc                           
                                                            3              -5,213                  10/28/02   02/05/03    Matzen Construction                 
                                                            3               3,314                  10/28/02   02/05/03    SNK Enterprises                     
                                                            4             -13,700                  10/28/02   02/05/03    Matzen Construction                 
                                                            4              -3,314                  10/28/02   02/05/03    Matzen Construction                 
                                                            4              -4,990                  10/28/02   02/05/03    SNK Enterprises                     
                                                            5-rev         -71,605                  10/28/02   02/05/03    Matzen Construction                 
 
01-1123   Reconstruction               0-001-010  06/12/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -500                  08/14/02   09/05/02    Standard Northeast                  
                                                            1              -3,245                  06/23/03   06/30/03    BEKA Const.                         
                                                            3             -10,530                  08/28/03   09/22/03    BEKA Const.                         
 
06-0133   Reconstruction               0-001-011  09/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01          -3,434                  01/09/07   01/24/07    T Mc Elligott                       
                                                            MC-02          -2,095                  06/05/07   07/27/07    T MC Elligott Inc                   
 
06-1678   Reconstruction               0-001-012  12/07/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001         21,269                  09/09/08   09/29/08    Shaker Flats Landscaping            
                                                            01-002         22,483                  09/29/08   05/14/09    SHAKER FLATS LANDSCAPING, INC.      
                                                            01-003        103,745                  09/29/08   05/14/09    SHAKER FLATS LANDSCAPING, INC.      
                                                            01-004         52,620                  12/29/10   02/24/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-005         42,700                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-006         44,760                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-007         82,980                  12/29/10   02/24/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-008         99,363                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-009          9,710                  12/29/10   01/03/12    SHAKER FLATS LANDSCAPING INC        
                                                            01-010        200,614                  12/29/10   02/24/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-011         25,270                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-012         27,750                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-013         12,500                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-014         11,108                  12/29/10   02/24/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-015          8,140                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-016         29,606          29,606  12/29/10   02/24/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-017         21,081                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-018         16,314                  12/29/10   02/15/11    SHAKER FLATS LANDSCAPING INC        
                                                            01-019         -4,225                  01/25/11   02/24/11    SHAKER FLATS LANDSCAPING INC        
                                                            02-001        -18,490                  04/29/08   08/04/08    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            02-002          4,188                  06/17/08   10/24/08    Bunkoff General Contractors         
                                                            02-003          1,629                  08/21/08   11/18/08    BUNKOFF GENERAL CONTRACTORS         
                                                            02-004           -656                  06/14/12   06/14/12    Bunkoff General Contractors         
                                                            03-001         -5,624                  09/09/08   07/08/09    Family Danz Heating & Air           
                                                            03-002         -3,219                  10/02/08   02/26/09    FAMILY DANZ HEATING & AIR CONDITIONI
                                                            03-003          2,581                  02/02/09   04/10/09    FAMILY DANZ HEATING & AIR           
                                                            03-004          2,995                  08/14/09   09/03/09    FAMILY DANZ HEATING & A/C           
                                                            04-001            632                  07/31/08   05/11/09    MAZONE PLUMBING & HEATING, INC.     
                                                            04-002         -5,000                  09/29/08   05/14/09    MAZONE PLUMBING & HEATING, INC.     
                                                            05-001          1,268                  10/08/08   05/14/09    J. A. BRADLEY & SONS, INC.          
                                                            05-002          1,599                  11/10/08   02/27/09    J.A. BRADLEY & SONS, INC.           
                                                            05-003         25,000                  09/22/09   08/22/11    J.A. BRADLEY & SONS INC             
                                                            05-004          1,660                  04/15/10   08/17/10    J.A. BRADLEY & SONS INC             
                                                            06-001            775                  07/31/08   03/09/09    LIMELIGHT PRODUCTIONS, INC.         
                                                            06-002         -2,655                  09/16/08   04/07/09    LIMELIGHT PRODUCTIONS, INC.         
                                                            06-003          5,838                  11/10/08   02/27/09    LIMELIGHT PRODUCTIONS, INC.         
                                                            06-004          1,823                  12/11/08   05/20/09    LIMELIGHT PRODUCTIONS, INC.         
                                                            07-001         -1,000                  09/25/08   05/14/09    SARATOGA RESTAURANT EQUIPMENT SALES 
                                                            08-001           -413                  09/16/08   05/12/09    NICKERSON CORPORATION               
                                                            09-001         -2,000                  10/23/08   11/12/08    NICKERSON CORPORATION               
                                                            10-001         -2,030                  04/28/08   08/04/08    N.E.P. GLASS CO., LTD.              
                                                            10-002         -1,568                  05/08/08   12/03/08    N.E.P. GLASS CO., LTD.              
                                                            10-003         19,256                  06/24/08   10/27/08    N.E.P. Glass                        
                                                            10-004          6,356                  07/15/08   12/03/08    N.E.P GLASS CO., Ltd.               
                                                            10-005          1,934                  10/02/08   05/14/09    N.E.P. GLASS CO., LTD.              
                                                            10-006          2,172                  05/04/09   07/31/09    N.E.P. GLASS CO LTD                 
                                                            10-007          3,500                  08/04/09   09/22/09    NEP GLASS CO LTD                    
                                                            10-008       -100,000                  10/13/09   11/19/09    N.E.P. GLASS CO LTD                 
 
06-0798   Reconstruction               0-001-013  02/21/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,888                  08/13/07   08/14/07    WEATHER GUARD ROOFING CO., LLC      
                                                            002            43,560                  09/06/07   09/14/07    WEATHER GUARD ROOFING CO., LLC.     
                                                            003            73,498                  09/10/07   10/18/07    WEATHER GUARD ROOFING CO., LLC.     
                                                            004             7,209                  10/01/07   10/23/07    WEATHER GUARD ROOFING CO., LLC.     
                                                            005             2,664                  11/19/07   12/12/07    Weather Guard Roofing               
                                                            006           102,467                  05/20/08   08/07/08    WEATHER GUARD ROOFING CO., LLC.     
                                                            007            -6,239                  09/09/08   09/29/08    Weather Guard Roofing               
 
19-0406   Reconstruction               0-001-015  12/20/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01         -20,000                  10/07/20   12/03/20    KASCON, LLC                         
                                                            EC-01           6,274                  07/05/23   12/28/23    LACORTE COMPANIES                   
                                                            EC-02             -46                  07/05/23   12/28/23    LACORTE COMPANIES                   
                                                            EC-03           1,825                  07/05/23   12/28/23    LACORTE COMPANIES                   
                                                            MC-01           2,708                  07/05/23   12/28/23    ECKERT MECHANICAL                   
                                                            MC-02           3,529                  07/05/23   12/28/23    ECKERT MECHANICAL                   
                                                            MC-03          11,433                  07/05/23   12/28/23    ECKERT MECHANICAL                   
                                                            MC-04           3,301                  07/05/23   12/28/23    ECKERT MECHANICAL                   
                                                            MC-05           4,891                  07/05/23   12/28/23    ECKERT MECHANICAL                   
                                                            MC-06          49,003                  07/05/23   12/28/23    ECKERT MECHANICAL                   
                                                            MC-07         -16,748                  07/05/23   12/28/23    ECKERT MECHANICAL                   
 
20-0280   Reconstruction               0-001-016  01/08/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DC-001         45,039                  09/19/23     /  /      GARNET TECH SOULTIONS               
                                                            DC-002         24,598                  09/19/23     /  /      GARNET TECH SOLUTIONS               
                                                            DC-003         42,575                  09/19/23     /  /      GARNET TECH SOLUTIONS               
                                                            DC-004            708                  09/19/23     /  /      GARNET TECH SOLUTIONS               
                                                            EC-001         10,426                  09/19/23     /  /      FLEX ELECTRIC                       
                                                            EC-002         18,900                  09/19/23     /  /      FLEX ELECTRIC                       
                                                            GC-28           9,745                  09/19/23     /  /      BAST HATFEILD CONSTRUCTION          
                                                            GC-29           3,250                  09/19/23     /  /      BAST HATFEILD CONSTRUCTION          
                                                            GC-30         -22,051                  09/19/23     /  /      BAST HATFEILD CONSTRUCTION          
                                                            GC-31          -8,033                  09/19/23     /  /      BAST HATFEILD CONSTRUCTION          
                                                            GC-32           3,800                  10/25/23   01/09/24    Bast Hatfield Construction          
                                                            MC-0            8,238                  09/19/23     /  /      DIGESARE MECHANICAL                 
                                                            MC-001         33,610                  09/19/23     /  /      RMB MECHANICAL                      
                                                            MC-002         32,412                  09/19/23     /  /      RMB MECHANICAL                      
                                                            MC-004         19,810                  09/20/23     /  /      RMB MECHANICAL                      
                                                            PC-001         34,469                  09/19/23     /  /      DIGESARE MECHANICAL                 
                                                            PC-002         35,022                  09/19/23     /  /      DIGESARE MECHANICAL                 
                                                            PC-003         34,739                  09/19/23     /  /      DIGESARE MECHANICAL                 
                                                            PC-004         27,120                  09/19/23     /  /      DIGESARE MECHANICAL                 
                                                            PC-006         34,157                  09/19/23     /  /      DIGESARE MECHANICAL                 
                                                            TBS-002         3,200                  09/19/23     /  /      TECHNICAL BUILDING SERVICES         
                                                            TBS-003        17,600                  09/19/23     /  /      TECHNICAL BUILDING SERVICES         
 
22-0819FA Reconstruction               0-001-017  02/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Storage Shed:
01-1124   Additions and Alterations    4-003-002  06/12/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               2,009                  04/24/03   05/05/03    BEKA Const.                         
 

          Bus Garage:
97-0394   Reconstruction               5-002-002  10/30/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              28,741                  10/28/02   02/05/03    Op-Tech Environmental               
 

          Storage/Concession Building:
06-1679   New Construction             7-005-001  12/07/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-004           -682                  06/14/12   06/14/12    Bunkoff General Contractors, Inc.   
 

          Pressbox @ Athletic Field:
09-0830   New Construction             7-006-001  02/02/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DC-001         71,148                  03/06/12   04/18/12    Dant Clayton Corp.                  
 

LANSINGBURGH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-06-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXLansingburgh Elementary-sold080421:
01-0388   Reconstruction               0-003-001  05/29/02  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0366   Reconstruction               0-003-004  02/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00011          27,787                  09/22/08   03/17/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00012          22,300                  09/22/08   03/17/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00013           4,659                  10/06/08   10/30/08    BUNKOFF GENERAL CONSTRUCTION        
 

          Knickerbacker Middle School:
92-0852   Reconstruction               0-006-002  04/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0258   Alterations                  0-006-004  09/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0389   Additions and Alterations    0-006-005  05/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-1           9,810                  08/19/03   08/27/03    Infinity Environ.                   
                                                            ASB-2           5,277                  03/12/04   04/07/04    Infinity Environ.                   
                                                            ASB-3          16,740                  03/12/04   04/06/04    Infinity Environ.                   
                                                            E-10            2,178                  05/19/04   05/27/04    Brownell Elec.                      
                                                            E-11             -432                  03/18/05   03/31/05    Brownell Electric Corp              
                                                            E-3             6,061                  01/06/04     /  /      Brownell Elec.                      
                                                            E-7             4,867                  03/18/04     /  /      Brownell Elec.                      
                                                            EC-12             564                  03/18/05   03/31/05    Brownell Electric Corp              
                                                            FC-1            3,126                  10/09/03   10/22/03    Ed Knight Wood Flooring             
                                                            FC-2           -2,500                  05/24/05   05/25/05    Edward Knight Wood Flooring         
                                                            G-7             3,450                  03/20/04   04/07/04    Duncan Cahill                       
                                                            GC9R            2,914                  03/18/05   03/31/05    Duncan Cahill                       
                                                            H-1            10,906                  03/12/04   05/27/04    DiGesare Mech.                      
                                                            H-2             8,838                  03/12/04   04/08/04    DiGesare Mech.                      
                                                            H-3             2,274                  03/18/05   03/31/05    DiGesare Mechanical                 
                                                            SC-7           22,717                  03/25/05   05/02/05    James Maloy Inc                     
                                                            SC-8            4,872                  03/25/05   05/02/05    James Maloy                         
                                                            TC-1            6,586                  01/06/04   03/15/04    NEC Business Communications         
                                                            TC-1           -3,414                  03/12/04   04/06/04    NEC Business Communications         
 
05-1268   Reconstruction               0-006-006  08/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,363                  02/09/09   06/08/09    COLLETT MECHANICAL, INC.            
                                                            00006             460                  10/01/07   01/14/08    MARTIN ENVIRONMENTAL SERVICES, INC. 
                                                            00008           1,570                  11/09/07   01/14/08    Campito Plumbing & Heating          
                                                            00010             856                  11/09/07   01/14/08    Campito Plumbing & Heating          
                                                            00011           1,503                  11/09/07   01/14/08    Campito Plumbing & Heating          
                                                            00014           6,087                  01/10/08   01/14/08    Campito Plumbing                    
                                                            00032           1,436                  11/01/07   01/15/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00046           1,162                  11/01/07   01/14/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00046           3,045                  11/01/07   11/09/07    SAM GRECO CONSTRUCTION, INC.        
                                                            00047           1,105                  11/09/07   01/14/08    Flex Electric Constructors          
                                                            00060           1,093                  11/09/07   12/27/07    Sam Greco Construction              
 
07-0367   Reconstruction               0-006-007  02/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           5,836                  10/03/08   10/30/08    COLLETT MECHANICAL                  
                                                            00003           1,031                  01/04/10   05/10/10    BPI PIPING                          
                                                            00005          -2,876                  09/01/09   11/10/09    COLLETT MECHANICAL INC              
                                                            00005          11,492                  11/01/10   11/17/10    BPI PIPING                          
                                                            00006           2,891                  10/03/08   09/23/09    HAROLD R. CLUNE                     
                                                            00006           5,279                  07/30/09     /  /      COLLETT MECHANICAL INC              
                                                            00007           7,330                  10/15/09   11/19/09    COLLETT MECHANICAL INC              
                                                            00008           1,800                  10/15/09   11/19/09    COLLETT MECHANICAL INC              
                                                            00009           2,703                  10/15/09   11/19/09    COLLETT MECHANICAL INC              
                                                            00010             246                  12/30/09   04/07/09    HAROLD R. CLUNE                     
                                                            00011           2,124                  10/15/09   11/19/09    HAROLD R. CLUNE                     
                                                            00011          16,877                  10/15/09   11/19/09    COLLETT MECHANICAL INC              
                                                            00012           2,080                  10/15/09   11/19/09    HAROLD R. CLUNE                     
                                                            00012           2,665                  01/19/10   05/07/10    COLLETT MECHANICAL INC              
                                                            00013             368                  10/15/09   11/19/09    HAROLD R. CLUNE                     
                                                            00013           4,784                  01/19/10   05/07/10    COLLETT MECHANICAL INC              
                                                            00014           6,331                  10/03/08   10/30/08    BUNKOFF GENERAL CONSTRUCTION        
                                                            00014           3,186                  10/15/09   11/19/09    HAROLD R. CLUNE                     
                                                            00014           5,743                  01/19/10   05/07/10    COLLETT MECHANICAL INC              
                                                            00015           2,522                  01/04/10   05/10/10    HAROLD R. CLUNE                     
                                                            00015           8,014                  03/01/11   03/28/11    COLLETT MECHANICAL INC              
                                                            00016           1,446                  10/03/08   10/30/08    BUNKOFF GENERAL CONSTRUCTION        
                                                            00016             924                  01/19/10     /  /      HAROLD R. CLUNE                     
                                                            00016          12,019                  03/18/10   05/07/10    COLLETT MECHANCIAL, INC.            
                                                            00039           9,975                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00040           7,349                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00041           4,534                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00042           2,927                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00043             837                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00044           2,176                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00045           3,162                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00046           6,528                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00047           2,764                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTING         
                                                            00049           1,135                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00050             508                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00051          14,459                  10/15/09   11/19/09    BUNKOFF GENERAL CONTRACTORS         
 
08-0256   Reconstruction               0-006-008  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00010           2,730                  11/01/10   11/08/10    BCI CONSTRUCTION                    
                                                            00015           5,227                  03/09/11   03/28/11    DLC ELECTRIC LLC                    
                                                            00020           2,000                  03/01/11   03/23/11    BCI CONSTRUCTION                    
 
10-1351   Reconstruction               0-006-009  06/29/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002             716                  09/25/12   12/31/13    GROSS ELECTRIC                      
 
11-0219   Reconstruction               0-006-010  12/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00000035        1,408                  11/03/14   11/10/14    DLC Electric LLC                    
                                                            000001            634                  08/03/12   11/21/12    Crisafulli Bros.                    
                                                            0000011        22,059                  01/13/15   01/14/15    Crisafulli Bros.                    
                                                            0000012         4,767                  05/08/13   12/04/13    DLC Electric LLC                    
                                                            0000015         4,374                  09/09/13   02/10/14    DLC Electric LLC                    
                                                            0000017         1,408                  09/09/13   09/19/13    DLC Electric LLC                    
                                                            000006         45,236                  04/11/14   04/30/14    Crisafulli Bros.                    
                                                            0000071         8,720                  09/09/13   09/17/13    Bette Cring Construction Group      
                                                            0000072         1,433                  09/09/13     /  /      Bette Cring Construction Group      
                                                            0000073         6,688                  09/09/13   09/12/13    Bette Cring Construction Group      
                                                            0000091       140,000                  03/17/14   05/12/15    Bette Cring Construction Group      
                                                            0000092        17,737                  03/17/14     /  /      Bette Cring Construction Group      
                                                            00001           7,142                  09/17/12   08/06/13    DLC ELECTRIC LLC                    
                                                            00005           1,195                  09/17/12   07/23/13    CRISAFULLI BROS                     
                                                            00006           1,935                  09/25/12   07/23/13    CRISAFULLI BROS.                    
                                                            00009           1,100                  08/03/12   11/16/12    Bette Cring Construction Group      
                                                            00009           7,173                  10/09/12   02/25/13    CRISAFULLI BROS                     
                                                            00011           1,997                  05/08/13   07/23/13    DLC Electric LLC                    
                                                            00012          26,300                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00014          11,810                  11/28/12   08/12/13    Crisafulli Bros.                    
                                                            00015          23,737                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00015           4,038                  11/28/12   08/12/13    Crisafulli Bros.                    
                                                            00016             752                  09/17/12   01/07/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00017             385                  11/28/12   07/23/13    Crisfulli Bros.                     
                                                            00018             784                  09/17/12   01/07/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00019          15,775                  09/17/12   01/07/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00019           3,215                  11/28/12   08/12/13    Crisafulli Bros.                    
                                                            00020           5,841                  11/28/12   03/04/13    Crisafulli Bros.                    
                                                            00020           5,457                  10/15/13   02/10/14    DLC ELECTRIC LLC                    
                                                            00023           2,137                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00024           1,068                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00027          15,752                  11/28/12   03/04/13    Bette Cring Constructon Group       
                                                            00030           3,401                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00035           2,273                  02/01/13   06/28/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00036          22,629                  02/01/13   05/09/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00042            -427                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00046          35,372                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00052           7,516                  04/11/13   07/11/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00056         -18,224                  04/11/13   07/11/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00078          16,343                  10/15/13   03/24/14    BETTE CRING CONSTRUCTION GROUP      
                                                            104          -111,689                  04/08/15   04/23/15    Bette Cring Construction Group      
 
13-0282   Reconstruction               0-006-011  03/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -10,000                  03/02/15   03/26/15    Mazone Plumbing & Heating, Inc.     
                                                            1              -2,486                  03/02/15   03/26/15    T. McElligott, Inc.                 
                                                            1              -1,156                  03/02/15   03/26/15    DLC Electric, LLC                   
                                                            1              11,777                  03/02/15   03/26/15    Hoosick Valley Contractors, Inc.    
 
18-0355   Reconstruction               0-006-012  11/21/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0435   Reconstruction               0-006-013  08/01/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0446   Reconstruction               0-006-015  12/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002          5,291                  05/13/21   07/02/21    GANEM CONTRACTING CORP.             
                                                            MC-001          1,850                  01/20/21   03/25/21    RMB MECHANICAL, INC.                
                                                            RC-001            471                  01/20/21   04/01/21    T.P. MONAHAN, INC.                  
 
22-1220   Reconstruction               0-006-016  03/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1732   Reconstruction               0-006-017  09/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0546FP Reconstruction               0-006-FP1  11/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lansingburgh High School:
94-1675   Reconstruction               0-010-004  07/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0259   Alterations                  0-010-005  09/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0131   Reconstruction               0-010-006  09/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0390   Reconstruction               0-010-007  05/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-4             590                  03/12/04   04/06/04    Infinity Environ.                   
                                                            E-2             2,526                  01/06/04     /  /      Brownell Elec.                      
                                                            E-4             3,595                  01/06/04   01/09/04    Brownell Elec.                      
                                                            E-5            11,327                  01/06/04   01/09/04    Brownell Elec.                      
                                                            E-8             3,411                  05/19/04   05/27/04    Brownell Elec.                      
                                                            G-1            18,528                  01/06/04     /  /      Duncan and Cahill                   
                                                            G-2            15,083                  01/06/04   03/15/04    Duncan and Cahill                   
                                                            G-3             9,145                  01/15/04   03/08/04    Duncan and Cahill                   
                                                            G-8             3,437                  03/12/04   04/07/04    Duncan and Cahill                   
                                                            R-1             3,199                  11/21/02   01/07/03    Weather Guard Roofing               
                                                            R-2               949                  11/21/02   01/07/03    Weather Guard Roofing               
                                                            R-3             2,384                  01/02/03   01/10/03    Weather Guard Roofing               
                                                            SC-2           14,367                  01/06/04   01/09/04    James Maloy                         
                                                            SC-3            6,903                  01/06/04   01/09/04    James Maloy                         
                                                            SC-4            5,310                  01/06/04   01/09/04    James Maloy                         
                                                            SC-6           11,160                  03/20/04   04/07/04    James Maloy                         
 
03-1001   Reconstruction               0-010-008  02/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1269   Additions and Alterations    0-010-012  08/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  04/27/07   08/20/07    Campito Plumbing Heating            
                                                            00001           3,928                  04/27/07   08/20/07    Flex Electric Constructors          
                                                            00001               0                  04/27/07   08/20/07    Collett mechanical                  
                                                            00001               0                  05/09/07   05/15/07    Martn Environmental                 
                                                            00001               0                  05/09/07   05/15/07    Sam Greco Constructions             
                                                            00001             752                  12/01/08   03/17/09    SAM GRECO CONSTRUCTION, INC.        
                                                            00001           1,171                  12/01/08   05/19/09    HAROLD R. CLUNE, INC.               
                                                            00002          11,991                  04/27/07   10/23/07    Flex Electric Constructors          
                                                            00002           2,715                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00002           1,971                  05/15/07   08/28/07    Collett Mechanical                  
                                                            00002             805                  05/15/07   08/28/07    Campito Plumbing Heating            
                                                            00002           6,852                  05/15/07   06/22/07    Martin Environmental                
                                                            00002           1,470                  12/01/08   03/18/09    SAM GRECO CONSTRUCTION, INC.        
                                                            00003               0                  04/27/07   08/20/07    Flex Electric Constructors          
                                                            00003             509                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00003           1,505                  05/15/07   08/28/07    Campito Plumbing Heating            
                                                            00003           4,110                  05/15/07   06/22/07    Martin Environmental                
                                                            00003             627                  06/25/07   01/14/08    Collett Mechanical                  
                                                            00003           1,950                  12/01/08   05/19/09    SAM GRECO CONSTRUCTION, INC.        
                                                            00004           7,472                  04/27/07   08/20/07    Felx Electric Constructors          
                                                            00004           2,179                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00004           1,159                  06/25/07   01/14/08    Campito Plumbing Heating            
                                                            00004           3,736                  11/05/07   01/14/08    Collett Mechanical                  
                                                            00004           3,190                  12/01/08   03/17/09    SAM GRECO CONSTRUCTION, INC.        
                                                            00005           5,081                  04/27/07   08/20/07    Flex Electric Constructors          
                                                            00005           3,771                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00005             941                  07/20/07   08/28/07    Campito Plumbing                    
                                                            00005           2,726                  10/01/07   01/15/08    MARTIN ENVIRONMENTAL SERVICES, INC. 
                                                            00005           1,153                  11/09/07   01/14/08    Collett Mechanical                  
                                                            00006             635                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00006               0                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00006            -112                  07/20/07   08/28/07    Campito Plumbing                    
                                                            00006           1,178                  11/09/07   01/14/08    Collett Mechanical                  
                                                            00007           1,536                  05/15/07   08/28/07    ]lex Electric Constructors          
                                                            00007             795                  11/05/07   01/14/08    Campito Plumbing & Heating          
                                                            00007             573                  11/09/07   01/14/08    Collett Mechanical                  
                                                            00008             881                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00008           1,978                  11/09/07   04/08/08    Collett Mechanical                  
                                                            00009           3,823                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00009          18,782                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00009          11,922                  11/09/07   01/14/08    Campito Plumbing & Heating          
                                                            00009          18,275                  05/02/08   08/12/08    COLLETT MECHANICAL, INC.            
                                                            00010           2,992                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00010          55,887                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00011          -4,418                  06/08/09   09/16/11    Flex Electric Constructors          
                                                            00011           1,061                  05/15/07   06/22/07    Sam Greco Construction              
                                                            00012           2,551                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00012           1,930                  05/15/07   06/22/07    sam Greco Construction              
                                                            00012           1,401                  11/09/07   01/14/08    Campito Plumbing & Heating          
                                                            00013           9,837                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00013          13,355                  06/08/09   07/28/09    SAM GRECO CONSTRUCTION INC          
                                                            00014           6,579                  05/15/07   09/16/11    Flex Electric Constructors          
                                                            00014             746                  06/25/07   07/17/07    Sam Greco Construction              
                                                            00015           5,778                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00015           3,550                  06/25/07   07/17/07    Sam greco construction              
                                                            00016           7,344                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00016           1,838                  06/25/07   07/17/07    Sam Greco Construction              
                                                            00017             680                  05/15/07   08/28/07    Flex Electric Constructors          
                                                            00017           9,534                  07/20/07   08/20/07    Sam Greco Construction              
                                                            00018           2,159                  06/25/07   01/14/08    Flex Electric Construction          
                                                            00018           1,116                  07/20/07   08/20/07    Sam Greco Construction              
                                                            00019           2,701                  07/20/07   08/28/07    Flex Electric Constructors          
                                                            00019           4,284                  07/20/07   08/20/07    Sam Greco Construction              
                                                            00020           1,296                  07/20/07   08/20/07    Sam Greco Construction              
                                                            00020           9,415                  10/01/07   11/07/07    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00021             993                  07/20/07   08/20/07    Sam Greco                           
                                                            00021           2,364                  08/30/07   01/14/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00022           3,279                  07/20/07   08/20/07    Sam Greco Construction              
                                                            00022           1,343                  10/01/07   01/14/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00023           8,226                  07/20/07   08/20/07    Sam Greco Construction              
                                                            00023           8,948                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00024           4,175                  07/20/07   08/20/07    Sam Greco Construction              
                                                            00024             423                  10/01/07   01/14/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00025           1,603                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00025           1,572                  10/01/07   01/14/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00026          10,006                  08/30/07   10/22/07    SAM GRECO CONSTRUCTION, INC.        
                                                            00026           4,735                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00027           5,520                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00027           3,546                  11/01/07   01/14/08    Flex Electric Construction          
                                                            00028          35,283                  08/06/07   08/20/07    Sam Greco Contruction               
                                                            00028           3,906                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00029           1,141                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00030           1,357                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00030             825                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00031           1,618                  08/30/07   01/23/08    SAM GRECO CONSTRUCTION, INC.        
                                                            00031           3,113                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00032             748                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00032          10,323                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00033             564                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00033           6,461                  11/01/07   04/08/08    Flex Electric Constructors          
                                                            00034             682                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00034           3,836                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00035           5,352                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00035           3,771                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00036           9,693                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00036           1,641                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00038A         13,639                  10/01/07   11/07/07    SAM GRECO CONSTRUCTION, INC.        
                                                            00038B         19,930                  10/01/07   11/07/07    SAM GRECO CONSTRUCTION, INC.        
                                                            00039          12,445                  08/06/07   08/20/07    Sam Greco Construction              
                                                            00039             559                  11/01/07   01/15/08    Flex Electric Constructors          
                                                            00040           2,070                  10/01/07   11/07/07    SAM GRECO CONSTRUCTION, INC.        
                                                            00040             548                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00041           7,046                  10/01/07   11/07/07    SAM GRECO CONSTRUCTION, INC.        
                                                            00041             488                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00042           8,680                  10/01/07   11/07/07    Sam greco Construction              
                                                            00042             611                  11/01/07   01/14/08    Flex Electric Constructors,Inc.     
                                                            00043          15,635                  10/01/07   11/07/07    SAM GRECO CONSTRUCTION, INC.        
                                                            00043           6,500                  11/01/07   08/08/08    Flex Electric Constructors          
                                                            00044             664                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00044           1,696                  11/05/07   12/27/07    Sam Greco Construction              
                                                            00045             339                  11/01/07   01/14/08    Flex Electric Constructors          
                                                            00045          19,465                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00047           9,164                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00048           1,780                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00049           5,636                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00050           9,207                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00051           3,062                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00051           5,403                  12/07/07   01/14/08    Flex Electric                       
                                                            00052             805                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00052           3,207                  12/07/07   01/14/08    Flex Electric                       
                                                            00053           2,395                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00053           3,116                  12/07/07   01/14/08    Flex Electric                       
                                                            00054             803                  11/01/07   12/27/07    Sam Greco Construction              
                                                            00055          19,126                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00056           7,431                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00057           1,859                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00058           2,297                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00059           4,951                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00061          10,282                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00062           1,771                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00063          24,387                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00064           1,240                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00065           1,976                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00066             730                  12/07/07   01/09/08    Sam Greco Construction              
                                                            00067           2,048                  06/08/09   07/28/09    SAM GRECO CONSTRUCTION INC          
                                                            00068           4,158                  12/07/07   01/09/08    Sam Greco Construction              
                                                            00069           4,590                  12/07/07   01/09/08    Sam Greco Construction              
                                                            00070           9,209                  11/16/07   12/27/07    Sam Greco Construction              
                                                            00071          19,951                  11/09/07   12/27/07    Sam Greco Construction              
                                                            00071           2,048                  12/07/07   01/09/08    Sam Greco Construction              
                                                            00071          19,951                  01/22/08   04/03/08    Sam Greco Construction              
                                                            00072             542                  01/10/08   01/25/08    Sam Greco Construction              
                                                            00073           3,379                  01/10/08   01/25/08    Sam Greco Construction              
                                                            00074           6,300                  01/22/08   04/03/08    Sam Greco Construction              
                                                            00075           6,469                  01/22/08   04/14/08    Sam Greco Construction              
                                                            00076           5,619                  01/22/08   04/04/08    SAM GRECO CONSTRUCTION, INC.        
                                                            00077           9,079                  05/07/08   08/04/08    SAM GRECO CONSTRUCTION, INC.        
                                                            00078           8,925                  01/22/08   04/04/08    Sam Greco Construction              
                                                            00079           9,660                  03/07/08   08/07/08    Sam Greco Construction, Incorp.     
                                                            00082           6,563                  05/02/08   08/04/08    SAM GRECO CONSTRUCTION, INC.        
                                                            00083           7,035                  09/02/08   05/12/09    SAM GRECO CONSTRUCTION, INC.        
                                                            00084           2,983                  07/18/08   12/03/08    SAM GRECO CONSTRUCTION, INC.        
                                                            00085           4,830                  07/18/08   03/09/09    SAM GRECO CONSTRUCTION, INC.        
                                                            00086           3,623                  07/18/08   05/11/09    SAM GRECO CONSTRUCTION, INC.        
                                                            00089           3,492                  07/31/08   10/31/08    SAM GRECO CONSTRUCTION, INC.        
                                                            HC-15           3,011                  01/10/08   01/14/08    Campito Plumbing                    
 
07-0368   Reconstruction               0-010-013  02/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001            -813                  07/18/11   08/18/11    SHAKER FLATS LANDSCAPING INC        
                                                            00002           3,530                  07/31/08   03/09/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00002            -579                  08/01/11   09/09/11    SHAKER FLATS LANDSCAPING INC        
                                                            00003          25,664                  08/01/11   09/09/11    SHAKER FLATS LANDSCAPING INC        
                                                            00004          14,129                  11/01/10   11/17/10    BPI PIPING                          
                                                            00004           6,545                  08/25/11   09/09/11    SHAKER FLATS LANDSCAPING INC        
                                                            00005           3,772                  08/25/11   09/09/11    SHAKER FLATS LANDSCAPING INC        
                                                            00015          24,960                  10/03/08   10/30/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00028          13,079                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00037           3,694                  07/13/09   08/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00038          10,159                  07/13/09   08/19/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00048             588                  01/19/10   05/07/10    BUNKOFF GENERAL CONTRACTORS         
                                                            00052           2,026                  07/02/10   12/10/10    BUNKOFF GENERAL CONTRACTORS         
 
08-0257   Reconstruction               0-010-014  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           4,000                  10/15/09   11/12/09    COPELAND COATING COMPANY INC        
                                                            00001               0                  08/23/10   09/13/10    DLC ELECTRIC LLC                    
                                                            00001               0                  08/23/10   09/13/10    FAMILY DANZ                         
                                                            00001               0                  08/23/10   09/13/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            00001               0                  08/23/10   09/13/10    BCI CONSTRUCTION                    
                                                            00002          19,500                  10/15/09   11/12/09    COPELAND COATING COMPANY INC        
                                                            00002           6,061                  08/23/10   09/13/10    BCI CONSTRUCTION                    
                                                            00002          12,696                  10/05/10     /  /      FAMILY DANZ                         
                                                            00003          10,000                  10/15/09   11/12/09    COPELAND COATING COMPANY INC        
                                                            00003           3,256                  10/05/10   10/29/10    FAMILY DANZ                         
                                                            00004          19,950                  10/15/09   11/12/09    COPELAND COATING COMPANY INC        
                                                            00004             714                  10/05/10   10/29/10    FAMILY DANZ                         
                                                            00004           2,504                  11/01/10   11/08/10    DLC ELECTRIC LLC                    
                                                            00005             416                  10/05/10   10/29/10    DLC ELECTRIC LLC                    
                                                            00005           1,303                  10/05/10   10/29/10    FAMILY DANZ                         
                                                            00006          -3,050                  10/05/10   10/29/10    DLC ELECTRIC LLC                    
                                                            00006           1,336                  11/01/10   11/08/10    FAMILY DANZ                         
                                                            00007           3,304                  10/05/10   10/29/10    BCI CONSTRUCTION                    
                                                            00007           3,812                  11/01/10   11/08/10    DLC ELECTRIC LLC                    
                                                            00008             532                  11/01/10   11/08/10    FAMILY DANZ                         
                                                            00008            -892                  11/01/10   11/08/10    DLC ELECTRIC LLC                    
                                                            00009           2,442                  11/01/10   11/08/10    DLC ELECTRIC LLC                    
                                                            00009             362                  11/01/10   11/08/10    BCI CONSTRUCTION                    
                                                            00009           2,233                  03/01/11   03/23/11    FAMILY DANZ                         
                                                            00011           1,063                  03/01/11   03/23/11    DLC ELECTRIC LLC                    
                                                            00012           2,508                  03/09/11   03/28/11    DLC ELECTRIC LLC                    
                                                            00014             892                  11/01/10   11/08/10    BCI CONSTRUCTION                    
                                                            00016           1,209                  08/25/11   02/10/12    DLC ELECTRIC LLC                    
                                                            00018           4,147                  03/23/11     /  /      BCI CONSTRUCTION                    
 
10-1352   Reconstruction               0-010-015  06/29/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0220   Reconstruction               0-010-016  12/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            000001         59,525                  03/17/14   06/17/14    Bette Cring Construction Group      
                                                            0000010       -17,267                  06/04/14   07/07/14    Bette & Cring Construction Group    
                                                            00000102       18,500                  06/04/14   07/07/14    Bette Cring Construction Group      
                                                            00000103        8,125                  06/04/14   07/07/14    Bette Cring Construction Group      
                                                            0000021        10,691                  04/11/14   05/05/14    Crisafulli Bros.                    
                                                            0000022       -13,600                  01/13/15   01/14/15    Crisafulli Bros.                    
                                                            000004        321,461                  05/09/13   06/17/14    Crisafuilli Bros.                   
                                                            000005         73,819                  08/14/13   06/17/14    Crisafulli Bros.                    
                                                            0000057         9,063                  08/14/13   10/24/13    Bette Cring Construction Group      
                                                            0000058         4,597                  08/14/13   09/17/13    Bette Cring Construction Group      
                                                            0000059        22,194                  08/14/13   09/17/13    Bette Cring Construction Group      
                                                            0000062         8,135                  08/14/13   09/17/13    Bette Cring Construction Group      
                                                            0000068         4,314                  09/09/13   09/17/13    Bette Cring Construction Group      
                                                            0000069         5,240                  09/09/13   09/17/13    Bette Cring Construction Group      
                                                            000007         16,652                  04/11/14   04/30/14    Crisafulli Bros.                    
                                                            0000070        18,988                  09/09/13   09/12/13    Bette Cring Construction Group      
                                                            0000074         3,460                  09/09/13   09/12/13    Bette Cring Construction Corp       
                                                            000008          3,118                  04/11/14   04/30/14    Crisafulli Bros.                    
                                                            0000085        81,947                  03/17/14   07/28/14    Bette & Cring Construction Group    
                                                            0000086       103,791                  03/17/14   01/21/16    Bette Cring Constructon Group       
                                                            0000087        31,476                  03/17/14   07/28/14    Bette And Cring Construction Group  
                                                            0000088        23,100                  03/17/14   10/05/16    Bette And Cring Construction Group  
                                                            0000089         6,913                  03/17/14   10/05/16    Bette And Cring Constructon Group   
                                                            000009         37,431                  05/08/13   06/17/14    DLC Electric LLC                    
                                                            000009        -38,700                  04/11/14   04/30/14    Crisafulli Bros.                    
                                                            0000090       111,614         111,624  03/17/14   10/06/14    Bette Crong Construction Group      
                                                            0000094         3,200                  06/04/14   07/07/14    Bette & Cring Construction Group    
                                                            0000095         7,500                  06/05/14   07/07/14    Bette & Cring Construction Group    
                                                            0000097        20,213                  06/04/14   07/07/14    Bette Cring Construction Group      
                                                            0000099        12,103                  06/04/14   07/07/14    Bette Cring Construction Group      
                                                            00001         -38,823                  08/03/12   11/21/12    Bette Cring Construction Group      
                                                            00002           3,641                  08/03/12   11/21/12    Bette Cring Construction Group      
                                                            00003           7,686                  08/03/12   11/21/12    Bette Cring Construction Group      
                                                            00004          27,495                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00004          59,600                  10/09/12   08/12/13    DLC ELECTRIC LLC                    
                                                            00005           2,050                  08/03/12   11/21/12    Bette Cring Construction Group      
                                                            00005             301                  04/11/13   07/23/13    DLC ELECTRIC LLC                    
                                                            00006           1,700                  08/03/12   07/23/13    Bette Cring Construction Group      
                                                            00006          10,370                  04/11/13   12/04/13    DLC ELECTRIC LLC                    
                                                            00007           1,818                  04/11/13   07/23/13    DLC ELECTRIC LLC                    
                                                            00007         594,829                  08/03/12   04/30/14    BETTE CRING CONSTRUCTION GROUP      
                                                            00008           6,500                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00008           3,387                  04/11/13   12/04/13    DLE Electric LLC                    
                                                            000093         28,431                  03/17/14   10/05/16    BETTE CRING CONSTRUCTION GROUP      
                                                            00016           1,105                  09/09/13   09/19/13    DLC Electric LLC                    
                                                            00020           2,251                  10/09/12   02/25/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00023           9,767                  10/15/13   02/10/14    DLC ELECTRIC LLC                    
                                                            00024          23,555                  10/15/13   02/10/14    DLC ELECTRIC LLC                    
                                                            00028           8,657                  11/03/14   11/07/14    DLC Electric LLC                    
                                                            00029          13,903                  11/03/14   11/07/14    DLC Electric LLC                    
                                                            00031          97,230                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00031           9,293                  11/03/14   11/10/14    DLC Electric LLC                    
                                                            00032           3,072                  11/03/14   11/10/14    DLC Electric LLC                    
                                                            00033           3,128                  12/19/12   03/19/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00034           2,483                  02/01/13   05/09/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00037             775                  02/01/13   05/09/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00037           1,943                  11/03/14   11/10/14    DLC Electric LLC                    
                                                            00038           2,936                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00040          48,959                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00041            -742                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00043           1,381                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00044           2,606                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00049          36,750                  03/11/13   07/12/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00050          17,819                  07/20/16   10/05/16    BETTE CRING CONSTRUCTION GROUP      
                                                            00051             769                  04/11/13   07/11/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00054           5,011                  04/11/13   07/11/13    BETTE CRING CONSTURCTION GROUP      
                                                            00055          21,127                  04/11/13   07/11/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00066         -18,820                  09/09/13   09/12/13    Bette Cring Construction Group      
                                                            00067           2,121                  09/09/13   09/12/13    Bette Cring Construction Group      
                                                            00076          31,537                  10/15/13   12/16/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00077          54,000                  10/15/13   04/30/14    BETTE CRING CONSTRUCTION GROUP      
                                                            00079               0                  10/15/13   12/16/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00081          41,115                  10/15/13   04/24/14    BETTE CRING CONSTRUCTION GROUP      
                                                            00082          14,640                  10/15/13   12/16/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00105          -1,260                  04/22/15   07/30/15    Bette Cring Construction Group      
 
13-0283   Reconstruction               0-010-017  03/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          16,242                  10/19/15   01/21/16    Duncan & Cahill, Inc.               
                                                            1              -7,336                  11/16/15   01/21/16    Crisafulli Bros.                    
                                                            1               4,761                  11/16/15   01/15/16    RPI Piping                          
                                                            1              -8,000                  11/16/15   01/15/16    J.McBain Inc.                       
                                                            1                 921                  11/16/15   01/15/16    Saratoga Resturant Equipment Sales  
                                                            2              -1,500                  11/16/15   01/15/16    BPI Roofing                         
 
19-0447   Reconstruction               0-010-020  12/06/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0951   Reconstruction               0-010-021  03/18/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,200                  06/09/22   05/09/23    M&S Tile&Marle Designs Inc          
 
20-0944   Reconstruction               0-010-022  07/28/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0543FP Reconstruction               0-010-FP1  11/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rensselaer Pk Elem (Grades3-5):
97-0260   Reconstruction               0-014-004  09/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0391   Reconstruction               0-014-005  05/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-6             1,174                  01/06/04   01/09/04    Brownell Elec.                      
                                                            G-6             3,710                  03/20/04   04/07/04    Duncan Cahill                       
                                                            SC-5           10,736                  01/06/04   03/15/04    James Maloy                         
 
05-1270   Reconstruction               0-014-006  08/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004           3,974                  08/30/07   10/22/07    MARTIN ENVIRONMENTAL SERVICES, INC. 
                                                            00013             993                  01/10/08   01/14/08    Campito Plumbing                    
                                                            00017          17,155                  01/22/08   08/04/08    Campito Plumbing                    
                                                            00019          24,612                  05/02/08   02/05/09    CAMPITO PLUMBING AND HEATING, INC.  
                                                            00021           9,153                  05/02/08   08/12/08    CAMPITO PLUMBING AND HEATING, INC.  
                                                            00023           1,594                  05/02/08   08/12/08    CAMPITO PLUMBING AND HEATING, INC.  
                                                            00038           3,733                  11/09/07   01/14/08    Flex Electric Constructors          
                                                            00049             774                  11/01/07   01/14/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00081          16,000                  03/07/08   04/18/08    Sam Greco Construction, Incorp.     
                                                            00088           1,408                  07/31/08   03/09/09    SAM GRECO CONSTRUCTION INC.         
 
07-0369   Reconstruction               0-014-007  02/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          26,235                  09/22/08   02/20/09    HAROLD R. CLUNE                     
                                                            00004           6,800                  06/10/09   06/10/09    JACK E. COLLETT                     
                                                            00005             953                  09/22/08   02/20/09    HARLD R. CLUNE                      
                                                            00006           3,029                  07/31/08   03/09/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00007          13,168                  11/01/10   11/17/10    BPI PIPING                          
                                                            00008           2,140                  09/22/08   03/17/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00008             175                  12/01/08   04/13/09    HAROLD R. CLUNE                     
                                                            00009           6,768                  09/22/08   03/17/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00010           1,167                  01/19/10   05/07/10    COLLETT MECHANICAL INC              
                                                            00017            -655                  12/09/10   01/13/11    COLLETT MECHANICAL INC              
                                                            00019           3,304                  10/03/08   10/30/08    BUNKOFF GENERAL CONSTRUCTION        
                                                            00021             328                  10/03/08   10/30/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00023             455                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00030           6,931                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00032          19,422                  11/25/08   06/16/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00033          -4,109                  11/25/08   06/16/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00036             153                  12/01/08   04/13/09    BUNKOFF GENERAL CONTRACTORS         
 
08-0258   Reconstruction               0-014-008  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           6,891                  03/18/10   05/14/10    CRUSAFULLI BROTHERS PLUMBING        
                                                            00005          10,025                  10/05/10   10/29/10    BCI CONSTRUCTION                    
                                                            00007             655                  11/01/10   11/08/10    FAMILY DANZ                         
                                                            00014             386                  03/09/11   03/28/11    DLC ELECTRIC LLC                    
                                                            00016          -5,130                  11/01/10   11/08/10    BCI CONSTRUCTION                    
 
10-1353   Reconstruction               0-014-009  06/29/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004           1,811                  09/25/12   12/31/13    GROSS ELECTRIC INC                  
                                                            005             3,903                  09/25/12   12/31/13    GROSS ELECTRIC INC                  
 
11-0221   Reconstruction               0-014-010  12/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00000030        3,345                  11/03/14   11/10/14    DLC Electric LLC                    
                                                            00000034        1,151                  11/03/14   11/10/14    DLC Electric LLC                    
                                                            00000036        5,182                  11/03/14   11/10/14    DLC Electric LLC                    
                                                            0000018        12,494                  09/09/13   02/10/14    DLC Electric LLC                    
                                                            0000026         7,188                  11/12/13   02/10/14    DLC Electric LLC                    
                                                            0000096        15,570                  06/04/14   07/07/14    Bette & Cring Construction Group    
                                                            00002         -13,740                  09/17/12   07/23/13    CRISAFULLI BROS                     
                                                            00003           4,051                  09/17/12   08/12/13    CRISAFULLI BROS                     
                                                            00003           7,142                  09/17/12   08/06/13    DLC ELECTRIC LLC                    
                                                            00004           3,991           3,991  09/17/12   08/08/13    CRISAFULLI BROS                     
                                                            00010          10,074                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00010           2,100                  10/09/12   08/12/13    CRISAFULLI BROS.                    
                                                            00013            -465                  10/09/12   07/23/13    CRISAFULLI BROS.                    
                                                            00014           3,426                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00016           2,675                  11/28/12   08/12/13    Crisafulli Bros.                    
                                                            00017             450                  09/17/12   01/07/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00022           2,877                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00022           4,061                  10/15/13   02/10/14    DLC ELECTRIC LLC                    
                                                            00029          -1,163                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00048           2,575                  03/11/13   07/12/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00060          -5,502                  08/14/13   09/17/13    Bette Cring Construction Group      
                                                            00080               0                  10/15/13   12/16/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00084           1,591                  10/15/13   12/16/13    BETTE CRING CONSTRUCTION GROUP      
 
18-1061   Reconstruction               0-014-011  03/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001            543                  01/20/21   03/25/21    HEWITT YOUNG ELECTRIC               
 
22-1221   Additions and Alterations    0-014-012  03/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0544FP Reconstruction               0-014-FP1  11/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Turnpike Elementary School:
97-0261   Reconstruction               0-015-004  09/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0392   Reconstruction               0-015-005  05/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-5          -3,083                  03/12/04   04/06/04    Infinity Environ.                   
                                                            E-1             4,113                  01/06/04   01/09/04    Brownell Elec.                      
                                                            E-9             3,221                  05/19/04   05/27/04    Brownell Elec.                      
                                                            G-4             1,855                  03/12/04   04/07/04    Duncan and Cahill                   
                                                            G-5            10,038                  03/12/04   04/07/04    Duncan and Cahill                   
                                                            SC-1            6,322                  01/06/04   03/15/04    James Maloy                         
 
05-1271   Reconstruction               0-015-006  08/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00017          17,155                  01/22/08   08/04/08    Campito Plumbing                    
                                                            00020          24,575                  05/02/08   05/11/09    CAMPITO PLUMBING AND HEATING, INC.  
                                                            00022           9,153                  05/02/08   08/12/08    CAMPITO PLUMBING AND HEATING INC.   
                                                            00024           1,594                  05/02/08   08/12/08    CAMPITO PLUMBING AND HEATING, INC.  
                                                            00037           3,734                  11/01/07   01/14/08    FLEX ELECTRIC CONSTRUCTORS, INC.    
                                                            00050             774                  11/19/07   01/15/08    Flex Electric Constructors          
                                                            00080          16,000                  03/07/08   04/18/08    Sam Greco Construction, Incorp.     
                                                            GC-87           1,408                  07/31/08   10/27/08    SAM GRECO CONSTRUCTION, INC.        
                                                            HC-16             993                  01/10/08   01/14/08    Campito Plumbing                    
 
07-0370   Reconstruction               0-015-008  02/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           1,731                  10/20/08   11/06/08    BPI PIPING                          
                                                            00003           6,799                  03/10/09   06/10/09    Collett Mechanical                  
                                                            00004          17,850                  09/02/08   05/12/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00004             953                  09/22/08   02/20/09    HAROLD R. CLUNE                     
                                                            00005           3,029                  07/31/08   03/09/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00006          13,168                  11/01/10   11/17/10    BPI PIPING                          
                                                            00007           2,140                  09/22/08   03/17/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00007             176                  11/25/08   06/16/09    HAROLD R. CLUNE                     
                                                            00009             408                  10/20/08   11/06/08    HAROLD R. CLUNE                     
                                                            00010           6,768                  09/22/08   03/17/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00017             200                  10/03/08   10/30/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00018           3,304                  10/03/08   10/30/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00020             328                  10/03/08   10/30/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00022             455                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00024             246                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00025           1,140                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00026           1,140                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00027             389                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00029           6,931                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            0003           17,850                  09/02/08     /  /      BUNKOFF GENERAL CONTRACTORS         
                                                            0003           24,531                  09/22/08   02/20/09    HAROLD R. CLUNE                     
                                                            00031          10,542                  10/20/08   11/06/08    BUNKOFF GENERAL CONTRACTORS         
                                                            00034          -4,109                  11/25/08   06/16/09    BUNKOFF GENERAL CONTRACTORS         
                                                            00035             153                  12/01/08   04/13/09    BUNKOFF GENERAL CONTRACTORS         
 
08-0259   Reconstruction               0-015-009  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           4,875                  10/05/10   10/29/10    DLC ELECTRIC LLC                    
                                                            00003               0                  10/05/10   10/29/10    BCI CONSTRUCTION                    
                                                            00003          -3,502                  10/05/10   10/29/10    DLC ELECTRIC LLC                    
                                                            00004          11,471                  10/04/10   10/29/10    BCI CONSTRUCTION                    
                                                            00006          31,548                  10/05/10   10/29/10    BCI CONSTRUCTION                    
                                                            00008            -153                  10/05/10   10/29/10    BCI CONSTRUCTION                    
                                                            00010           1,573                  11/01/10   11/08/10    DLC ELECTRIC LLC                    
                                                            00011           4,772                  11/01/10   11/08/10    BCI CONSTRUCTION                    
                                                            00012          25,307                  11/01/10   11/08/10    BCI CONSTRUCTION                    
                                                            00013             840                  11/01/10   11/08/10    BCI CONSTRUCTION                    
                                                            00013           1,353                  03/09/11   03/28/11    DLC ELECTRIC LLC                    
                                                            00015           2,391                  11/01/10   11/08/10    BCI CONSTRUCTION                    
                                                            00017             374                  12/09/10   01/13/11    BCI CONSTRUCTION                    
                                                            00019             860                  03/01/11   03/23/11    BCI CONSTRUCTION                    
 
10-1354   Reconstruction               0-015-010  06/29/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,811                  09/25/12   12/31/13    GROSS ELECTRIC INC                  
                                                            00003           3,903                  09/25/12   12/31/13    GROSS ELECTRIC INC                  
 
11-0222   Reconstruction               0-015-011  12/21/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            0000010        10,269                  05/08/13   12/04/13    DLC Electric LLC                    
                                                            00000101       19,963                  06/04/14   07/07/14    Bette Cring Construction Group      
                                                            0000013           717                  05/08/13   07/23/13    DLC Electric LLC                    
                                                            0000014         6,425                  09/09/13   02/10/14    DLC Electric LLC                    
                                                            0000027         7,188                  11/12/13   02/10/14    DLC Electric LLC                    
                                                            0000064         7,007                  09/09/13   09/17/13    Bette Cring Construction Group      
                                                            0000065        13,198                  09/09/13   09/17/13    Bette Cring Construction Group      
                                                            00001         -13,740                  09/17/12   07/23/13    CRISAFULLI BROS                     
                                                            00002           4,051                  09/17/12   08/12/13    CRISAFULLI BROS                     
                                                            00002           7,142                  09/17/12   08/06/13    DLC ELECTRIC LLC                    
                                                            00003           3,991                  09/17/12   08/12/13    CRISAFULLI BROS                     
                                                            00007             844                  09/25/12   07/23/13    CRISAFULLI BROS                     
                                                            00008           6,367                  09/25/12   08/12/13    CRISAFULLI BROS.                    
                                                            00011          10,074                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00011           1,169                  10/09/12   07/23/13    CRISAFULLI BROS                     
                                                            00012            -469                  10/09/12   07/23/13    CRISAFULLI BROS.                    
                                                            00013           5,634                  08/03/12   11/14/12    Bette Cring Construction Group      
                                                            00018           1,745                  11/28/12   07/23/13    Crisafulli Bros.                    
                                                            00021           2,877                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00025           3,499                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00026           3,284                  11/28/12   03/04/13    Bette Cring Construction Group      
                                                            00028           3,386                  11/28/12   08/16/13    Bette Cring Construction Group      
                                                            00032          84,350                  12/19/12   05/17/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00039           2,520                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00045             985                  03/11/13   06/20/13    Bette Cring Const Group             
                                                            00047          10,227                  03/11/13   06/20/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00053           6,646                  04/11/13   07/11/13    BETTE CRING CONSTRUCTION GROUP      
                                                            00083          13,318                  10/15/13   12/16/13    BETTE CRING CONSTRUCTION GROUP      
 
16-0184   Additions and Alterations    0-015-013  02/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          6,344                  09/10/18   09/19/18    FLEX ELECTRIC LLC                   
                                                            EC-002         17,639                  09/10/18   09/19/18    FLEX ELECTRIC LLC                   
                                                            GC-001         43,284                  08/31/17   10/17/17    Jersen Construction Group           
                                                            GC-002          9,624                  10/03/17   11/27/17    Jersen Construction Group           
                                                            GC-003         44,310                  05/31/18   08/06/18    JERSEN CONSTRUCTION GROUP           
                                                            GC-004         22,566                  09/06/18   11/28/18    JERSEN CONSTRUCTION GROUP           
                                                            GC-005         31,909                  09/06/18   11/28/18    JERSEN CONSTRUCTION GROUP           
                                                            GC-006         23,344                  01/23/19   03/12/19    JERSEN CONSTRUCTION GROUP           
                                                            GC-007         51,691                  12/20/18   03/03/20    JERSEN CONSTRUCTION GROUP           
                                                            GC-008          9,860                  04/02/19   04/24/19    JERSEN CONSTRUCTION GROUP           
                                                            MC-001         15,514                  08/31/17   10/17/17    T. McElligott Inc.                  
                                                            MC-002         13,537                  12/29/17   01/31/18    T. McElligott Inc.                  
                                                            MC-003         12,714                  04/02/19   04/02/19    T. MCELLIGOTT INC.                  
                                                            MC-004        -24,251                  06/17/20   07/15/20    T. MCELLIGOTT, INC.                 
                                                            MC-005          2,136                  06/17/20   07/15/20    T. MCELLIGOTT, INC.                 
                                                            PC-001         16,523                  09/20/17   10/12/17    Burniche Piping, Inc.               
                                                            PC-002        -18,945                  12/20/18   03/12/19    BURNICHE PIPING, INC.               
 
02-0545FP Reconstruction               0-015-FP1  11/21/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Strg.Bldg. @ Rensselaer Park ES:
07-0371   New Construction             2-018-001  02/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building at Turnpike Element:
07-0372   New Construction             2-019-001  02/15/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building:
11-0223   New Construction             2-020-001  12/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE

NORTH GREENBUSH COMMON SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-08-01-08
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Little Red School House:
20-0045   Additions and Alterations    0-001-002  09/21/20  NO CHANGE ORDERS ON ELECTRONIC FILE

WYNANTSKILL UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-08-04-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Avenue School:
96-0842   Reconstruction               0-001-001  02/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1451   Reconstruction               0-001-002  06/23/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 

          Gardner Dickenson:
00-0817   Additions and Alterations    0-004-005  08/31/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01          10,444                  01/22/03   02/12/03    Peter Luizzi Bros.                  
                                                            02-01           3,463                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-02             447                  03/05/03   03/24/03    Hoosick Valley Contractors          
                                                            02-03            -349                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-04             620                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-05           3,093                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-06             159                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-07             413                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-08             347                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-09             422                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-10           1,698                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-11            -125                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-12            -735                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-13            -750                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-14           3,098                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-15             205                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-16             249                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-17            -974                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-18           2,127                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-19           2,797                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-20           1,147                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-21           5,010                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-22           2,053                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-23           5,190                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-24          12,173                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-25           2,773                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-26           1,371                  01/22/03   02/12/03    Hoosick Valley Contractors          
                                                            02-27           1,509                  01/22/03   02/12/03    Hoosick Valley Contractors          
                                                            02-28           4,477                  01/22/03   02/12/03    Hoosick Valley Contractors          
                                                            02-29           5,626                  01/22/03   Disapproved Hoosick Valley Contractors          
                                                            02-30           1,651                  01/22/03   02/12/03    Hoosick Valley Contractors          
                                                            02-31           1,054                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-32           2,242                  02/21/03   03/04/03    Hoosick Valley Contractors          
                                                            02-33          -1,013                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-34           1,134                  02/03/03   03/04/03    Hoosick Valley Contractors          
                                                            02-35          -2,175                  03/05/03   03/24/03    Hoosick Valley Contractors          
                                                            02-36           2,601                  03/04/03   03/24/03    Hoosick Valley Contractors          
                                                            02-37           4,383                  06/03/03   06/04/03    Hoosick Valley Contractors          
                                                            03-01              80                  02/03/03   03/04/03    Trojan Hardware                     
                                                            03-02             465                  02/03/03   03/04/03    Trojan Hardware                     
                                                            03-03             910                  02/03/03   03/04/03    Trojan Hardware                     
                                                            03-04             185                  02/03/03   03/04/03    Trojan Hardware                     
                                                            03-05           1,330                  01/22/03   02/12/03    Trojan Hardware                     
                                                            03-06           1,713                  01/22/03   02/12/03    Trojan Hardware                     
                                                            03-07           1,889                  01/22/03   02/12/03    Trojan Hardware                     
                                                            03-09           1,099                  02/03/03   03/04/03    Trojan Hardware                     
                                                            03-10           1,622                  02/03/03   03/04/03    Trojan Hardware                     
                                                            04-01           1,000                  02/03/03   03/04/03    Harold R. Clune                     
                                                            04-02             560                  02/03/03   03/04/03    Harold R. Clune                     
                                                            04-03             706                  02/03/03   03/04/03    Harold R. Clune                     
                                                            04-04             443                  02/03/03   03/04/03    Harold R. Clune                     
                                                            04-05           2,386                  02/03/03   03/04/03    Harold R. Clune                     
                                                            04-06             165                  01/22/03   02/12/03    Harold R. Clune                     
                                                            04-07            -840                  01/22/03   02/12/03    Harold R. Clune                     
                                                            04-08           1,450                  01/22/03   02/12/03    Harold R. Clune                     
                                                            04-09           1,980                  01/22/03   02/12/03    Harold R. Clune                     
                                                            04-10           4,735                  01/22/03   02/12/03    Harold R. Clune                     
                                                            04-11           3,060                  02/03/03   03/04/03    Harold R. Clune                     
                                                            04-12             650                  04/04/03   04/17/03    Harold R. Clune                     
                                                            04-13           2,460                  04/04/03   04/17/03    Harold R. Clune                     
                                                            05-01             419                  02/03/03   03/04/03    EW Tompkins                         
                                                            05-02           9,197                  06/13/03   07/01/03    EW Tompkins                         
                                                            05-03           7,219                  02/21/03   03/04/03    EW Tompkins                         
                                                            05-04           2,150                  01/22/03   02/12/03    EW Tompkins                         
                                                            05-05           3,630                  01/22/03   02/12/03    EW Tompkins                         
                                                            05-06             442                  02/03/03   03/04/03    EW Tompkins                         
                                                            05-07             576                  03/05/03   03/24/03    EW Tompkins                         
 
05-0718   Reconstruction               0-004-006  01/17/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0564   Reconstruction               0-004-007  03/17/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-02         -10,623                  11/18/08   04/03/09    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            01-03           3,112                  12/02/08   03/18/09    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            01-04           8,235                  01/23/09   05/15/09    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            01-05           1,468                  10/20/09   11/20/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-06           9,025                  08/11/09   04/15/11    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-07           1,864                  08/07/09   09/16/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-08          27,984                  09/22/09   11/10/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-09          -3,640                  09/22/09   11/10/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-10           1,721                  09/22/09   11/10/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-11           3,862                  10/08/09   11/17/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-12           3,842                  10/27/09   11/20/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-13           2,897                  10/27/09   11/20/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-14           3,042                  10/27/09   11/20/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-15           6,608                  10/29/09   12/30/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-16           7,685                  10/29/09   12/30/09    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-17           2,891                  02/26/10   05/27/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-18           4,517                  03/22/10   05/26/10    HOOSICK VALLEY CONTRACTORS INC      
                                                            02-02          28,528                  11/18/08   09/26/11    CAMPITO PLUMBING & HEATING, INC.    
                                                            02-03             641                  01/23/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            02-04             437                  07/03/09   08/18/09    CAMPITO PLUMBING & HEATING INC      
                                                            02-05          -4,414                  02/26/10   05/27/10    CAMPITO PLUMBING & HEATING INC      
                                                            03-002          4,503                  11/18/08   04/03/09    FLEX ELECTRIC                       
                                                            03-003          2,319                  05/05/09   08/11/09    FLEX ELECTRIC                       
                                                            03-004            513                  05/05/09   08/11/09    FLEX ELECTRIC                       
                                                            03-005          1,733                  05/05/09   08/11/09    FLEX ELECTRIC                       
                                                            03-006            445                  10/08/09   11/17/09    FLEX ELECTRIC                       
                                                            03-007          2,128                  10/27/09   11/20/09    FLEX ELECTRIC                       
                                                            04-01             405                  10/27/09   11/20/09    JOHN V WARREN INC                   
                                                            04-02           4,504                  12/04/09   12/15/10    JOHN V WARREN INC                   
                                                            04-03            -504                  03/22/10   05/26/10    JOHN V WARREN INC                   
 
09-0285   Reconstruction               0-004-008  02/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            01-001         -2,500                  08/06/10   09/14/10    ROSCH BROTHERS INC                  
                                                            01-002            906                  08/13/10   09/13/10    ROSCH BROTHERS INC                  
                                                            01-003          1,723                  08/13/10   09/13/10    ROSCH BROTHERS INC                  
                                                            01-004          2,843                  08/27/10   09/24/10    ROSCH BROTHERS INC                  
                                                            01-005          5,809                  09/27/10   10/29/10    ROSCH BROTHERS INC                  
                                                            01-006          1,759                  11/03/10   11/09/10    ROSCH BROTHERS INC                  
                                                            01-007            733                  11/03/10   11/09/10    ROSCH BROTHERS INC                  
                                                            01-008          2,092                  11/03/10   11/09/10    ROSCH BROTHERS INC                  
                                                            01-009          5,067                  11/03/10   11/09/10    ROSCH BROTHERS INC                  
                                                            01-010          7,521                  12/13/10   02/22/11    ROSCH BROTHERS INC                  
                                                            01-011          2,520                  03/30/12   10/22/12    ROSCH BROTHERS INC                  
                                                            02-001            660                  09/09/10   09/28/10    FAMILY DANZ HEATING & A/C INC       
                                                            02-002            272                  11/15/10   11/17/10    FAMILY DANZ HEATING & A/C INC       
                                                            03-001            437                  08/30/10   09/14/10    BURNICHE PIPING, INC.               
                                                            04-001          9,185                  09/09/10   09/28/10    FLEX ELECTRIC                       
                                                            1A-01               0                  04/11/12   10/22/12    ROSCH BROTHERS INC                  
                                                            4-02            3,315           1,410  04/05/12   06/28/13    FLEX ELECTRIC                       
 
15-0276   Reconstruction               0-004-010  01/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-001        -50,000                  07/27/17   08/22/17    Finelli Construction, Inc.          
                                                            02-001              0                  10/16/17   11/08/17    Finelli Construction, Inc.          
                                                            02-002         47,000                  08/24/17   09/14/17    Finelli Construction, Inc.          
                                                            02-002              0                  10/16/17   11/08/17    Finelli Construction, Inc.          
                                                            02-003              0                  10/16/17   11/08/17    Finelli Construction, Inc.          
                                                            02-003         42,513                  10/16/17     /  /      Finelli Construction, Inc.          
                                                            02-004         -4,594                  01/26/18   05/15/18    Finelli Construction, Inc.          
                                                            02-005         -3,457                  01/26/18   05/15/18    Finelli Construction, Inc.          
                                                            02-006            654                  01/26/18   05/15/18    Finelli Construction, Inc.          
                                                            02-007         -8,554                  01/26/18   05/15/18    Finelli Construction, Inc.          
                                                            02-008         -2,031                  01/26/18   05/15/18    Finelli Construction, Inc.          
                                                            02-009           -336                  02/22/18   05/15/18    Finelli Construction, Inc.          
                                                            02-010          1,790                  02/22/18   05/15/18    Finelli Construction, Inc.          
                                                            02-011          5,840                  02/22/18   04/18/18    Finelli Construction, Inc.          
                                                            02-012            606                  02/22/18   04/18/18    Finelli Construction, Inc.          
                                                            02-013           -246                  02/22/18   04/18/18    Finelli Construction, Inc.          
                                                            02-014        -36,034                  02/22/18   04/18/18    Finelli Construction, Inc.          
                                                            02-015        -17,999                  02/22/18   04/18/18    Finelli Construction, Inc.          
                                                            02-016         -7,754                  02/22/18   04/18/18    Finelli Construction, Inc.          
                                                            02-017         -2,790                  02/22/18   04/18/18    Finelli Construction, Inc.          
                                                            02-018           -412                  12/26/18   02/11/19    FINELLI CONSTRUCTION INC            
                                                            02-019          6,055                  12/26/18   02/11/19    FINELLI CONSTRUCTION INC            
                                                            02-020          2,604                  07/18/18   09/12/18    FINELLI CONSTRUCTION INC            
                                                            02-021          1,184                  07/18/18   09/12/18    FINELLI CONSTRUCTION INC            
                                                            02-022         14,959                  12/26/18   02/11/19    FINELLI CONSTRUCTION INC            
                                                            02-023         34,089                  12/26/18   02/11/19    FINELLI CONSTRUCTION INC            
                                                            02-024          7,459                  07/18/18   09/12/18    FINELLI CONSTRUCTION INC            
                                                            02-025          1,767                  07/26/18   09/14/18    FINELLI CONSTRUCTION INC            
                                                            02-026          1,727                  08/14/18   01/14/19    FINELLI CONSTRUCTION, INC.          
                                                            02-027         -1,855                  08/14/18   01/14/19    FINELLI CONSTRUCTION, INC.          
                                                            02-028         -4,890                  08/14/18   01/14/19    finelliconstruction, inc.           
                                                            02-029            891                  08/14/18   01/14/19    FINELLI CONSTRUCTION, INC.          
                                                            02-030            625                  08/14/18   01/28/19    FINELLI CONSTRUCTION, INC.          
                                                            02-031          1,309                  08/14/18     /  /      FINELLI CONSTRUCTION, INC.          
                                                            02-032             77                  08/14/18   01/28/19    FINELLI CONSTRUCTION, INC.          
                                                            02-033           -630                  08/14/18   01/28/19    FINELLI CONSTRUCTION, INC.          
                                                            02-034            -64                  08/14/18   01/28/19    FINELLI CONSTRUCTION, INC.          
                                                            02-035          1,219                  08/14/18     /  /      FINELLI CONSTRUCTION, INC.          
                                                            02-036            658                  08/14/18     /  /      FINELLI CONSTRUCTION, INC.          
                                                            02-037         -4,361                  08/14/18   01/28/19    FINELLI CONSTRUCTION, INC.          
                                                            02-038         -1,031                  08/14/18   01/28/19    FINELLI CONSTRUCTION, INC.          
                                                            02-039          2,380                  11/16/18   01/16/19    FINELLI CONSTRUCTION, INC.          
                                                            02-040            150                  12/03/18   01/28/19    FINELLI CONSTRUCTION INC            
                                                            02-041            384                  11/16/18   01/16/19    FINELLI CONSTRUCTION, INC.          
                                                            02-042           -402                  11/16/18   01/04/19    FINELLI CONSTRUCTION, INC.          
                                                            02-043         26,450                  12/03/18   01/28/19    FINELLI CONSTRUCTION INC            
                                                            02-044         15,403                  12/03/18   02/27/19    FINELLI CONSTRUCTION, INC.          
                                                            02-045         19,837                  12/03/18   01/28/19    FINELLI CONSTRUCTION INC            
                                                            02-046         28,612                  12/03/18   01/28/19    FINELLI CONSTRUCTION INC            
                                                            02-047         29,566                  12/03/18   01/28/19    FINELLI CONSTRUCTION INC            
                                                            02-048         28,520                  12/03/18   01/28/19    FINELLI CONSTRUCTION INC            
                                                            03-001         37,571                  09/11/17   11/27/17    Campito Plumbing & Heating, Inc.    
                                                            03-001              0                  10/16/17   11/06/17    Campito Plumbing & Heating, Inc.    
                                                            03-002        -10,038                  12/03/18   01/25/19    CAMPITO PLUMBING & HEATING INC      
                                                            03-004              0                  01/26/18   03/08/18    Campito Plumbing & Heating, Inc.    
                                                            04-001        -15,400                  07/27/17     /  /      ARCON Electric, LLC                 
                                                            04-001              0                  08/24/17   09/07/17    ARCON Electric, LLC                 
                                                            04-002          5,000                  08/24/17   09/07/17    ARCON Electric, LLC                 
                                                            04-003           -649                  08/24/17   09/07/17    ARCON Electric, LLC                 
                                                            04-004         -1,209                  08/24/17   09/07/17    ARCON Electric, LLC                 
                                                            04-005          2,800                  10/16/17   11/06/17    Arcon Electric                      
                                                            04-006         -1,000                  11/13/17   11/28/17    Arcon Electric                      
                                                            04-007         -8,400                  11/13/17   11/28/17    Arcon Electric                      
                                                            04-011            374                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            04-012            493                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            04-013          1,994                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            04-014            307                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            04-015          1,929                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            04-016            402                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            04-017        -21,292                  12/20/18   01/29/19    ARCON ELECTRIC                      
                                                            05-001         -1,896                  03/22/18   04/06/18    Buniche Piping Inc. dba BPI Piping  
                                                            05-002              0                  01/26/18   03/08/18    Buniche Piping Inc. dba BPI Piping, 
                                                            05-002        -14,407                  03/22/18   04/06/18    Buniche Piping Inc. dba BPI Piping  
                                                            05-003           -635                  03/22/18   04/06/18    Buniche Piping Inc. dba BPI Piping  
                                                            05-004         -3,729                  11/16/18   12/03/18    BUNICHE PIPING INC DBA BPI PIPING   
                                                            AD03-002            0                  11/13/17   11/28/17    Campito Plumbing & Heating, Inc.    
                                                            AD03-003            0                  11/13/17   11/28/17    Campito Plumbing & Heating, Inc.    
                                                            AD03-005            0                  11/16/18   12/03/18    CAMPITO PLUMBING & HEATING INC      
                                                            AD03-006            0                  11/16/18   12/03/18    CAMPITO PLUMBING & HEATING INC      
                                                            AD03-007            0                  12/03/18   01/25/19    CAMPITO PLUMBING & HEATING INC      
                                                            AD04-002            0                  12/07/18   01/16/19    ARCON ELECTRIC                      
                                                            AD04-003            0                  12/07/18   01/16/19    ARCON ELECTRIC                      
                                                            AD04-004            0                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            AD04-005            0                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            AD04-006            0                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            AD04-007            0                  11/16/18   12/03/18    ARCON ELECTRIC                      
                                                            AD04-008            0                  12/20/18   01/29/19    ARCON ELECTRIC                      
                                                            AD05-001            0                  03/22/18   04/06/18    Buniche Piping Inc. dba BPI Piping  
                                                            AD05-002            0                  03/22/18   04/06/18    Buniche Piping Inc. dba BPI Piping  
                                                            AD05-003            0                  11/16/18   12/03/18    BUNICHE PIPING INC DBA BPI PIPING   
                                                            AD05-004            0                  11/16/18   12/03/18    BUNICHE PIPING INC DBA BPI PIPING   
                                                            EC-04-08          887                  08/14/18     /  /      ARCON ELECTRIC                      
                                                            EC-04-09       20,984                  08/14/18     /  /      ARCON ELECTRIC                      
                                                            EC-04-10        4,813                  08/14/18     /  /      ARCON ELECTRIC                      
 
02-0996FP Reconstruction               0-004-FP1  01/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE

RENSSELAER CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-12-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Van Rensselaer Elementary:
90-0795   Reconstruction               0-003-005  01/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0656   Additions and Alterations    0-003-006  04/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1231   Reconstruction               0-003-008  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1181   Reconstruction               0-003-010  05/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0777   Reconstruction               0-003-011  02/24/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0918   Reconstruction               0-003-014  03/24/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0369SC Visual Structural Inspection 0-003-SC1  10/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jr/Sr High School:
98-0919   Reconstruction               0-007-005  03/24/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1348   Reconstruction               0-007-006  09/04/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 327                  03/19/03   03/24/03    BPI Piping                          
                                                            1               1,366                  03/19/03   03/24/03    Nickerson                           
                                                            1               2,600                  03/19/03   03/24/03    Facilities Equip.                   
                                                            1              -1,875                  03/19/03   03/24/03    Farina Elec.                        
                                                            1              -5,019                  03/19/03   03/24/03    Carpenter-Roslund                   
                                                            2              -1,000                  03/19/03   03/24/03    Facilities Equip.                   
 

          Pre-K-12 Building:
05-0964   New Construction             0-013-001  03/31/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            008            90,041                  03/21/08   04/21/08    Marx Properties                     
                                                            009             1,810                  03/21/08   04/21/08    Marx Properties                     
                                                            010             4,863                  03/21/08   04/21/08    Marx Properties                     
                                                            011            24,012                  03/21/08   04/21/08    Marx Properties                     
                                                            1           3,837,834                  11/29/07     /  /      UW Marx Construction Co.            
                                                            2              20,000                  11/29/07   12/12/07    U.W. Marx Construction Co.          
                                                            3              65,158                  11/29/07   12/12/07    U.W. Marx Construction Co.          
                                                            4              50,307                  11/29/07   12/12/07    U.W. Marx Construction Co.          
                                                            5              -9,065                  12/12/07   01/09/08    Marx Properties                     
                                                            6              -3,497                  12/12/07   01/09/08    Marx Properties                     
                                                            7              20,276                  12/12/07   01/09/08    Marx Properties                     
 
08-0001   Reconstruction               0-013-002  03/31/06  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0951   Reconstruction               0-013-003  09/20/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01          26,719                  11/14/14   11/18/14    Adirondack Cabling, Inc.            
                                                            CC-02          -5,534                  02/24/15   02/27/15    Adirondack Cabling, Inc.            
                                                            EC-01           4,631                  07/25/14   08/20/14    Stilsing Electric, Inc.             
                                                            EC-02           3,742                  07/25/14   08/20/14    Stilsting Electric, Inc.            
                                                            EC-03          18,161          18,161  07/25/14   09/04/14    Stilsing Electric, Inc.             
                                                            EC-04          21,765                  07/25/14   08/20/14    Stilsing Electric, Inc.             
                                                            EC-05          26,032                  07/25/14   08/20/14    Stilsing Electric, Inc.             
                                                            EC-06R         -1,422                  02/24/15   02/27/15    Stilsing Electric, Inc.             
                                                            GC-01          12,766                  07/10/14   08/08/14    Gallo Construction Corp.            
                                                            GC-02           4,200                  11/28/14   12/05/14    Gallo Construction Corp.            
                                                            GC-03          10,243                  11/28/14   12/05/14    Gallo Construction Corp.            
                                                            SC-01          22,192                  07/10/14   08/08/14    Peter Luizzi & Bros. Contracting    
                                                            SC-02             790                  11/28/14   12/05/14    Peter Luizzi & Bros. Contracting    
                                                            SC-03               0           1,146  11/28/14   12/05/14    Peter Luizzi & Bros. Contracting Inc
                                                            SC-04               0                  02/24/15   02/27/15    Peter Luizzi & Bros. Contracting, In
 
13-0838   Reconstruction               0-013-004  12/13/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0391   Reconstruction               0-013-005  01/23/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0952   Reconstruction               0-013-006  01/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01            -609                  01/22/18   02/02/18    Zerodraft of CNY, Inc.              
 
21-1773FC Reconstruction               0-013-007  05/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Shed:
07-1143   New Construction             3-015-001  03/31/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage II:
01-0168   Reconstruction               4-010-L01  08/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Leased Bus Garage:
02-2480   Reconstruction               5-012-L01  04/01/03  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1563   Reconstruction               5-012-L02  10/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0388   Reconstruction               5-012-L03  09/21/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
07-1144   New Construction             7-014-001  03/31/00  NO CHANGE ORDERS ON ELECTRONIC FILE

AVERILL PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-13-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
90-1448   Reconstruction               0-001-004  06/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE

AVERILL PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-13-02-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________
95-0521   Additions and Alterations    0-001-001  03/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1227   Alterations                  0-001-003  06/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0036   Additions and Alterations    0-001-004  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          27,112                  12/31/03   02/03/04    James Maloy                         
                                                            00003             991                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00006           2,563                  12/09/03   12/26/03    Harold R Clune                      
                                                            00008          -3,500                  09/28/04   10/04/04    James Maloy                         
                                                            00018           1,979                  11/29/04   01/03/05    Harold R Clune                      
                                                            00025           2,480                  09/28/04   10/04/04    James Maloy                         
                                                            00036           4,034                  06/29/04   07/06/04    Bunkoff General Contractors         
                                                            0004            9,406                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00041            -920                  09/28/04   10/04/04    Bunkoff General Contractors         
                                                            0009            4,128                  09/28/04   10/04/04    James Maloy                         
 
02-0491   Additions and Alterations    0-001-005  05/21/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,461                  03/02/04   03/09/04    Collett Mech.                       
                                                            00001           5,849                  05/25/04   06/10/04    T Lemme Mech.                       
                                                            00001           1,493                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00001           2,850                  12/13/04   12/24/04    Northeast Interior Systems          
                                                            00001             459                  12/13/04   12/24/04    DiBernardo Tile and Marble          
                                                            00001             580                  12/11/06   01/19/07    Northeastern Specialty Systems      
                                                            00002           1,660                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00002           4,863                  12/13/04   12/24/04    Northeast Interior Systems          
                                                            00003             479                  05/25/04   06/10/04    Collett Mech.                       
                                                            00003           1,499                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00004             573                  05/25/04   06/10/04    Collett Mech.                       
                                                            00006           6,000                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00007             666                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00008           2,346                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00009           1,912                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00010         -32,512                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00010           1,104                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00011            -479                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00011             920                  12/13/04   12/24/04    Collett Mech.                       
                                                            00011             458                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00013             746                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00014           2,315                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00016           1,080                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00016           5,623                  12/13/04     /  /      Collett Mech.                       
                                                            00019          -8,651                  05/25/04   06/10/04    Flex Mech.                          
                                                            00023             403                  05/25/04   06/10/04    Flex Mech.                          
                                                            00025        -558,657                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00026           1,380                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00028           1,385                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00029           6,621                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00030             444                  09/29/05   10/13/05    D & B Acoustical                    
                                                            00031             904                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00031             946                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00031         -43,250                  12/11/06   01/12/07    Collett Mechanical                  
                                                            00032           3,583                  12/13/04   12/24/04    DePoalo & Sons                      
                                                            00034          10,292                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00034           1,415                  12/13/04   12/24/04    DePoalo & Sons                      
                                                            00038           8,621                  12/13/04   04/26/06    Flex Elec. Constructors             
                                                            00038           8,621                  12/13/06   04/26/06    FLEX ELECTRICAL CONSTRUCTORS        
                                                            00039           1,329                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00040             688                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00041             636                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00046             251                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00052             692                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00055             232                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00057             980                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00058           1,201                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00060           1,984                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00064           1,799                  03/02/05   04/28/05    Flex Electrical Constructors        
                                                            00072          24,900                  09/29/05   04/26/06    Flex Electrical Constructors        
                                                            0045              501                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            09-MC           7,157                  03/31/15   04/28/15    Merit Plumbing & Heating Inc.       
                                                            10-MC           1,544                  03/31/15   04/28/15    Merit Plumbing & Heating, LLC       
                                                            A-1            -1,003                  03/02/04   04/13/04    DePoalo & Sons                      
                                                            A-3               623                  03/02/04   04/12/04    DePoalo & Sons                      
                                                            A4-Z           -6,670                  09/29/05   10/13/05    DePoalo & Son Building Contractors  
                                                            B-2               622                  03/02/04   03/05/04    Collett Mech.                       
                                                            B-22              165                  03/02/05   04/28/05    Collett Mechanical                  
                                                            B-23            1,605                  03/02/05   04/28/05    Collett mechanical                  
                                                            B-26              220                  04/27/05   06/10/05    Collett Mechanical                  
                                                            C-9             1,272                  04/27/05   06/10/05    T Lemme Mechanical                  
                                                            D-1               478                  03/02/04   05/06/04    Flex Elec.                          
                                                            D-3             2,371                  03/02/04   03/05/04    Flex Elec.                          
                                                            D-4             1,854                  03/02/04   03/05/04    Flex Elec.                          
                                                            D-5             3,339                  03/02/04   05/06/04    Flex Elec.                          
                                                            D-68              638                  04/27/05   06/10/05    Flex Electrical Constructors        
                                                            D-8               977                  03/02/04   03/05/04    Flex Elec.                          
                                                            F-18              932                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-23              581                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-24              471                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-26              976                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-28              713                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-31            3,908                  04/06/06     /  /      D and B Acoustical                  
                                                            F-4             3,908                  04/27/05   06/10/05    DandB Acoustical                    
                                                            G-11             -291                  09/29/05     /  /      t Lemme Mechancial                  
                                                            H-4            10,613                  03/02/05   03/24/05    Northeast Interior Sytems           
                                                            H-6             1,865                  03/02/05   03/24/05    Northeast Interior Systems          
                                                            J-2             1,695                  09/29/05   10/13/05    DiBernardo Tile and Marble Co       
                                                            J-3               690                  09/29/05   10/13/05    DiBernardo tile and Marble          
                                                            J-4               310                  09/29/05   10/13/05    DiBernardo tile and Marble          
                                                            J-5               320                  09/29/05   10/13/05    DiBernardo Tile Marble co           
                                                            J-6              -629                  09/29/05   10/13/05    DiBernardo tile and Marble          
                                                            X-2               300                  04/27/05   06/10/05    King Venetian                       
                                                            Y-2             9,476                  09/29/05   10/13/05    Rochester Flooring Resource         
 
04-1494   Reconstruction               0-001-006  07/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,301                  05/30/07   06/18/07    Northeast Interior Systems          
                                                            00001           6,543                  05/30/07   06/18/07    Hoosick Valley Contractors          
                                                            00001             647                  05/30/07   07/17/07    Stilsing Electric                   
                                                            00002             480                  05/30/07   06/18/07    Hoosick Valley Contractors          
 
07-0416   Additions and Alterations    0-001-007  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002            520                  03/26/09   05/07/09    WB ROOFING & SHEETMETAL, INC.       
                                                            01-004         -7,500                  07/10/09   09/23/09    WB ROOFING & SHEETMETAL INC         
                                                            01-006          4,897                  10/30/09   12/29/09    WB ROOFING & SHEETMETAL INC         
                                                            01-010          1,719                  10/30/09   12/29/09    WB ROOFING & SHEETMETAL INC         
                                                            01-011         15,004                  02/04/10   05/07/10    WB ROOFING & SHEETMETAL INC         
                                                            01-012            316                  02/04/10   05/07/10    WB ROOFING & SHEETMETAL INC         
                                                            01-013          2,644                  02/04/10   05/07/10    WB ROOFING & SHEETMETAL INC         
                                                            01-014         19,782                  02/04/10   05/07/10    WB ROOFING & SHEETMETAL INC         
                                                            01-015          2,629                  03/09/10   05/28/10    WB ROOFING & SHEETMETAL INC         
                                                            01-016         -1,215                  04/20/10   08/27/10    WB ROOFING & SHEETMETAL INC         
                                                            01-017         -5,000                  04/20/10   08/27/10    WB ROOFING & SHEETMETAL INC         
                                                            01-018          1,453                  07/02/10   11/22/10    WB ROOFING & SHEETMETAL INC         
                                                            01-019            335                  10/25/10   01/07/11    WB ROOFING & SHEETMETAL INC         
                                                            02-001          1,547                  10/06/08   10/30/08    BAST HATFIELD INC                   
                                                            02-002          5,498                  10/06/08   11/06/08    BAST HATFIELD INC.                  
                                                            02-004         14,593                  10/06/08   10/23/08    BAST HATFIELD INC                   
                                                            02-006          3,564                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-008          3,321                  03/26/09   04/23/09    BAST HATFIELD INC.                  
                                                            02-009          2,447                  03/26/09   04/23/09    BAST HATFIELD INC.                  
                                                            02-012          9,534                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-015          5,167                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-016A          -181                  05/29/09   06/03/09    BAST HATFIELD INC                   
                                                            02-019          2,550                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-021          2,109                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-024         28,454                  03/26/09   04/23/09    BAST HATFIELD INC.                  
                                                            02-028         12,521                  03/26/09   05/05/09    BAST HATFIELD INC                   
                                                            02-032         -1,013                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-036          1,521                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-039          2,057                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-041          3,547                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-042          1,207                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-044          1,375                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-046          1,623                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-047          1,337                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-048            751                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-050            923                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-051          5,016                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-052            503                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-053          1,745                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-056         -1,352                  10/30/09   12/29/09    BAST HATFIELD INC                   
                                                            02-057         16,324                  10/30/09   12/29/09    BAST HATFIELD INC                   
                                                            02-061          1,591                  11/20/09   02/05/10    BAST HATFIELD INC                   
                                                            02-064          5,209                  02/04/10   05/07/10    BAST HATFIELD INC                   
                                                            02-065            820                  02/04/10   05/07/10    BAST HATFIELD INC                   
                                                            02-067            600                  02/04/10   05/10/10    BAST HATFIELD INC                   
                                                            02-068         26,060                  02/04/10   05/07/10    BAST HATFIELD INC                   
                                                            02-069         16,754                  02/04/10     /  /      BAST HATFIELD INC                   
                                                            02-070          2,117                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-072          3,679                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-076          3,833                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-078            799                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-079          4,562                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-080         10,657                  04/20/10   08/27/10    BAST HATFIELD INC                   
                                                            02-082            885                  04/20/10   08/27/10    BAST HATFIELD INC                   
                                                            02-083          2,000                  04/20/10   08/27/10    BAST HATFIELD INC                   
                                                            02-085          2,286                  07/02/10     /  /      BAST HATFIELD INC                   
                                                            02-087         14,626                  10/25/10   01/07/11    BAST HATFIELD INC                   
                                                            02-088          2,977                  10/25/10   01/07/11    BAST HATFIELD INC                   
                                                            02-089            473                  11/15/10   12/01/10    BAST HATFIELD INC                   
                                                            02-090            994                  05/10/11   05/20/11    BAST HATFIELD INC                   
                                                            03-002          1,249                  03/26/09     /  /      T. LEMME MECHANICAL, INC.           
                                                            03-003         10,003                  03/26/09     /  /      T. LEMME MECHANICAL, INC.           
                                                            03-004          9,610                  07/10/09   08/28/09    T LEMME MECHANICAL INC              
                                                            03-005          4,935                  07/10/09   08/28/09    T LEMME MECHANICAL INC              
                                                            03-008          1,067                  10/30/09   12/29/09    T. LEMME MECHANICAL INC             
                                                            04-007          1,944                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-013          1,323                  03/26/09   05/07/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-014            288                  03/26/09   05/07/09    CAMPITO PLUMBING & HEATING          
                                                            04-015          4,012                  07/10/09   08/28/09    CAMPITO PLUMBING & HEATING INC      
                                                            04-017            322                  07/10/09   08/28/09    CAMPITO PLUMBING & HEATING INC      
                                                            04-021            841                  03/09/10   05/28/10    CAMPITO PLUMBING & HEATING INC      
                                                            04-022            871                  03/09/10   05/28/10    CAMPITO PLUMBING & HEATING INC      
                                                            04-023          1,215                  04/20/10   08/27/10    CAMPITO PLUMBING & HEATING INC      
                                                            04-024          1,076                  04/20/10   08/27/10    CAMPITO PLUMBING & HEATING INC      
                                                            04-025         30,484                  10/25/10   01/07/11    CAMPITO PLUMBING & HEATING INC      
                                                            04-026         26,655                  10/25/10   01/07/11    CAMPITO PLUMBING & HEATING INC      
                                                            05-003            563                  10/06/08   10/30/08    HAROLD R. CLUNE INC.                
                                                            05-004          3,360                  10/06/08   10/30/08    HAROLD R. CLUNE INC.                
                                                            05-006          1,898                  03/26/09   04/23/09    HAROLD R. CLUNE INC.                
                                                            05-008          2,346                  03/26/09   04/23/09    HAROLD R. CLUNE INC.                
                                                            05-011         15,421                  03/26/09   11/26/12    HAROLD R. CLUNE INC.                
                                                            05-012         17,917                  03/26/09   04/23/09    HAROLD R. CLUNE INC.                
                                                            05-013          1,838                  03/26/09   11/26/12    HAROLD R. CLUNE INC.                
                                                            05-014          2,148                  03/26/09   04/23/09    HAROLD R. CLUNE INC.                
                                                            05-015          1,030                  03/26/09   04/23/09    HAROLD R. CLUNE INC.                
                                                            05-016          3,658                  03/26/09     /  /      HAROLD R. CLUNE INC.                
                                                            05-017          1,281                  07/10/09   08/28/09    HAROLD R. CLUNE INC.                
                                                            05-018          4,100                  07/10/09   08/28/09    HAROLD R. CLUNE INC.                
                                                            05-020          1,863                  07/10/09   08/28/09    HAROLD R. CLUNE INC.                
                                                            05-021         -5,154                  07/10/09   08/28/09    HAROLD R. CLUNE INC.                
                                                            05-022          4,126                  07/10/09   08/28/09    HAROLD R. CLUNE INC.                
                                                            05-023            804                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            05-024          4,271                  10/30/09   12/29/09    HAROLD R CLUNE INC                  
                                                            05-026          1,449                  10/30/09   12/29/09    HAROLD R CLUNE INC                  
                                                            05-028          5,565                  10/30/09   12/29/09    HAROLD R CLUNE INC                  
                                                            05-030         10,009                  11/20/09   02/05/10    HAROLD R CLUNE INC                  
                                                            05-032          1,672                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            05-034          1,338                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            05-036          1,921                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            05-038          3,463                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            05-042          5,796                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            05-045          3,203                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            05-046            949                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            05-049            634                  04/20/10   08/27/10    HAROLD R CLUNE INC                  
                                                            05-052          5,528                  10/25/10   01/07/11    HAROLD R CLUNE INC                  
                                                            05-053            845                  10/25/10   01/07/11    HAROLD R CLUNE INC                  
 
10-0492   Reconstruction               0-001-008  11/30/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0446   Reconstruction               0-001-009  02/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-MC           1,249                  11/21/14   12/03/14    MERIT PLUMBING & HEATING,LLC        
                                                            03-EC           4,945                  11/21/14   12/03/14    J. McBain Electric Inc              
                                                            03-MC          16,253                  11/21/14   12/03/14    MERIT PLUMBING & HEATING,LLC        
                                                            05-MC           2,705                  12/23/14   01/12/15    Merit Plumbing & Heating LLC        
                                                            07-MC           2,489                  01/09/15   08/11/15    Merit Plumbing & Heating, LLC       
                                                            08-MC             884                  02/13/15   02/27/15    Merit Plumbing & Heating, LLC       
 
13-0538   Reconstruction               0-001-010  05/27/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001-MC          2,891                  02/13/15   02/17/15    Family Danz Heating and AC, Inc.    
                                                            002-MC          2,156                  02/13/15   02/17/15    Family Danz Heating and AC Inc.     
                                                            003-MC          1,290                  02/13/15   02/22/15    Family Danz Heating and AC Inc.     
                                                            004-MC          1,661                  02/13/15   02/17/15    Family Danz Heating and AC Inc.     
                                                            005-MC          2,808                  04/24/15   05/12/15    Family Danz Heating & A/C Inc.      
                                                            006-MC          5,404                  04/24/15   05/12/15    Family Danz Heating & A/C Inc.      
                                                            007-MC          1,498                  05/26/15   06/17/15    Family Danz Heating and AC Inc.     
                                                            008-MC          1,771                  05/26/15   06/17/15    Family Danz Heating And AC Inc.     
                                                            009-MC          8,068                  05/26/15   06/17/15    Family Danz Heating And AC Inc.     
                                                            01-EC           4,859                  11/21/14   12/08/14    HAROLD R. CLUNE INC.                
                                                            01-GC           7,979                  11/21/14   12/08/14    MALONE & TATE BUILDERS INC.         
                                                            01-P            7,619                  01/09/15   01/13/15    Tri Valley Plumbing & Heating, Inc. 
                                                            010-MC            938                  10/09/15   11/18/15    Family Danz Heating and A/C, Inc.   
                                                            02-EC             201                  11/21/14   12/08/14    HAROLD R. CLUNE INC.                
                                                            02-GC           1,796                  11/21/14   12/08/14    MALONE & TATE BUILDERS INC.         
                                                            02-P            1,935                  01/09/15   01/13/15    Tri Valley Plumbing & Heating, Inc. 
                                                            03 G C D        1,693                  12/04/15   12/23/15    GALLO CONSTRUCTION CORP.            
                                                            03-EC           1,272                  03/31/15   04/07/15    Harold R. Clune Inc.                
                                                            03-GC           1,940                  11/21/14   12/08/14    MALONE & TATE BUILDERS INC.         
                                                            03-P            1,027                  01/09/15   01/13/15    Tri Valley Plumbing & Heating, Inc. 
                                                            03E             1,413                  10/09/15   10/28/15    Flex Electric                       
                                                            04-EC             675                  03/31/15   04/07/15    Harold R. Clune Inc.                
                                                            04-GC           6,252                  12/23/14   01/07/15    Malone & Tate Builders Inc.         
                                                            04-P            1,082                  04/24/15   05/12/15    Tri Valley Plumbing & Heating Inc.  
                                                            04E               221                  12/04/15   12/23/15    FLEX ELECTRIC                       
                                                            05-GC           1,179                  03/31/15   04/07/15    Malone & Tate Builders Inc.         
                                                            05-P              383                  05/26/15   06/17/15    Tri valley Plumbing & Heating       
                                                            06-EC           3,253                  03/31/15   06/19/15    Harold R. Clune Inc.                
                                                            06-GC           1,312                  03/31/15   04/07/15    Maline & Tate Builders Inc.         
                                                            06-GC           2,085                  12/07/15   12/23/15    GALLO CONSTRUCTION CORP.            
                                                            07-EC           1,248                  03/31/15   04/08/15    Harold R. Clune Inc.                
                                                            07-GC           3,199                  03/31/15   04/07/15    Malone & Tate Builders Inc.         
                                                            07-GC           1,897                  12/07/15   12/23/15    GALLO CONSTRUCTION CORP.            
                                                            08-GC          46,778                  03/31/15   04/07/15    Malone & Tate Builders Inc.         
                                                            09-GC           1,974                  04/24/15   05/12/15    Malone & Tate Builders, Inc.        
                                                            09GC-D         24,378                  01/11/16   01/21/16    GALLO CONSTRUCTION CORP.            
                                                            10                649                  03/08/16   03/18/16    Gallo Construction Corp.            
                                                            10-GC          10,300                  09/24/15   05/12/15    Malone & Tate Builders, Inc.        
                                                            11-EC           2,669                  04/24/15   05/12/15    Harold R. Clune Inc.                
                                                            11-GC          10,361                  04/24/15   05/12/15    Malone & Tate Builders, Inc.        
                                                            12-EC           1,243                  05/26/15   06/17/15    Harold R. Clune Inc.                
                                                            12-GC           2,764                  08/07/15   08/26/15    Malone & Tate Builders Inc.         
                                                            13-EC             930                  05/26/15   06/17/15    Harold R. Clune Inc.                
                                                            13-GC           1,270                  10/09/15   11/18/15    Malone & Tate Builders Inc.         
                                                            14-EC           1,661                  05/26/15     /  /      Harold R. Clune Inc.                
                                                            14-GC           1,784                  10/09/15   11/18/15    Malone & Tate Builders Inc.         
                                                            15-EC           2,533                  05/26/15   06/17/15    Harold R. Clune Inc.                
                                                            15-GC           1,150                  10/09/15   11/18/15    Malone & Tate Builders Inc.         
                                                            16-EC           2,871                  08/07/15   08/26/15    Harold R. Clune Inc.                
                                                            16-GC           5,896                  10/09/15   11/18/15    Malone & Tate Builders Inc.         
                                                            17-EC          43,608                  12/04/15   12/23/15    HAROLD R. CLUNE INC.                
                                                            17-GC           1,908                  12/04/15   12/23/15    MALONE & TATE BUILDERS INC.         
                                                            18-EC           5,790                  01/11/16   01/21/16    HAROLD R. CLUNE INC                 
                                                            18-GC          29,688                  12/04/15   12/23/15    MALONE & TATE BUILDERS,INC.         
                                                            19-EC          10,427                  01/11/16   01/21/16    HAROLD R. CLUNE INC                 
                                                            19-GC           2,444                  12/04/15   12/23/15    MALONE & TATE BUILDERS,INC.         
                                                            20-EC           4,817                  01/11/16   01/21/16    HAROLD R. CLUNE INC                 
                                                            20-GC          24,490                  12/04/15   12/23/15    MALONE & TATE BUILDERS,INC.         
                                                            21-GC           4,745                  12/04/15   12/23/15    MALONE & TATE BUILDERS,INC.         
                                                            22-GC           1,041                  12/04/15   12/23/15    MALONE & TATE BUILDERS,INC.         
                                                            23-EC             432                  01/11/16   01/21/16    HAROLD R. CLUNE INC                 
                                                            23-GC           5,179                  12/04/15   12/23/15    MALONE & TATE BUILDERS INC.         
                                                            24-EC           1,515                  01/11/16   01/21/16    HAROLD R. CLUNE INC.                
                                                            24-GC           1,458                  12/04/15   12/23/15    MALONE & TATE BUILDERS INC.         
                                                            27-EC           1,402                  03/08/16   03/18/16    Harold R. Clune Inc.                
                                                            28-EC           5,544                  03/08/16   03/18/16    Harold R. Clune Inc.                
                                                            29-EC          -2,508                  03/08/16   03/18/16    Harold R. Clune Inc.                
                                                            30-EC           1,389                  03/08/16   03/18/16    Harold R. Clune Inc.                
                                                            31-EC           2,861                  04/07/16   04/18/16    Harold R. clune Inc.                
 
15-0690   Reconstruction               0-001-011  01/19/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            16-01          22,990                  10/26/16   10/27/16    Callanan Industries, Inc.           
                                                            16-02          12,830                  10/26/16   10/27/16    Callanan Industries, Inc.           
                                                            16-03           2,530                  10/26/16   10/27/16    Callanan Industries, Inc.           
                                                            16-04           4,725                  10/26/16   10/27/16    Callanan Industries, Inc.           
                                                            16-05           1,975                  10/26/16   10/27/16    Callanan Industries, Inc.           
                                                            17-01         -34,343                  10/26/16   10/27/16    Lupini Construction, Inc.           
                                                            17-02           9,391                  10/26/16   10/27/16    Lupini Construction, Inc.           
                                                            17-03           1,762                  10/28/16   11/01/16    Lupini Construction, Inc.           
                                                            18-01           1,065                  10/26/16   10/27/16    Comali                              
 
16-1109   Reconstruction               0-001-012  03/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            19-01          31,845                  05/24/17   06/01/17    Wainschaf Associates, Inc.          
 
20-0124   Reconstruction               0-001-013  08/25/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1178   Reconstruction               0-001-014  08/10/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1048   Reconstruction               0-001-015  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0495   Reconstruction               0-001-016  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0077   Reconstruction               0-001-017  08/31/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0553   Reconstruction               0-001-018  11/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0935FP Reconstruction               0-001-FP1  01/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1683   Visual Structural Inspection 0-001-SC1  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1699SC Visual Structural Inspection 0-001-SC2  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1700SC Visual Structural Inspection 0-001-SC3  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXSand Lake Elementary (sold):
95-0553   Additions and Alterations    0-002-001  03/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1228   Reconstruction               0-002-002  06/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0037   Reconstruction               0-002-003  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,286                  12/09/03   12/26/03    Harold R. Clune                     
                                                            00001          87,782                  01/12/07   02/01/07    Jupiter Environmental Services      
                                                            00003           1,351                  03/04/04   03/15/04    James Maloy                         
                                                            00004          16,744                  12/09/03   12/26/03    T. McElligott                       
                                                            00004           1,525                  01/12/07   01/18/07    Jupiter Environmental Services      
                                                            00006           1,635                  01/12/07   01/18/07    Jupiter Environmental Services      
                                                            00007           2,563                  12/09/03   12/26/03    Harold R. Clune                     
                                                            00007           2,491                  12/09/03   01/08/04    T. McElligott                       
                                                            00007             497                  01/12/07   01/18/07    Jupiter Environmental Services      
                                                            00008           1,985                  12/09/03   12/26/03    Harold R. Clune                     
                                                            00010           4,920                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00010             523                  12/31/03   01/13/04    Harold R. Clune                     
                                                            00010           8,950                  09/28/04   10/04/04    James Maloy                         
                                                            00011           2,135                  12/09/03   12/26/03    T. McElligott                       
                                                            00013             699                  05/27/04   06/07/04    T. McElligott                       
                                                            00013           1,725                  08/20/04   09/28/04    Harold R Clune                      
                                                            00016          -1,001               3  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00017           7,338                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00018           1,000                  09/28/04   10/04/04    James Maloy                         
                                                            00020         -11,207                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00022          -1,101                  12/09/03   01/14/04    Bunkoff General Contractors         
                                                            00023           5,189                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00026            -535                  12/31/03   01/16/04    Bunkoff General Contrctors          
                                                            00027             479                  12/31/03   01/16/04    Bunkoff General Contractors         
                                                            00028          -7,400                  12/31/03   01/20/04    Bunkoff General Contractors         
                                                            00029            -600                  12/31/03   01/16/04    Bunkoff General Contractors         
                                                            00031          52,252                  04/19/05   06/10/05    James Maloy                         
                                                            00032           4,885                  06/29/04   07/06/04    Bunkoff General Contractors         
                                                            00042          -3,027                  11/16/04   11/29/04    Bunkoff Gen. Contractors            
                                                            C1              3,264                  12/09/03   01/08/04    T. McElligott                       
 
07-0417   Reconstruction               0-002-004  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-013          4,434                  03/26/09   05/20/09    BAST HATFIELD INC.                  
                                                            02-022         -1,500                  03/26/09   05/19/09    BAST HATFIELD INC.                  
                                                            02-033            603                  03/26/09   05/19/09    BAST HATFIELD INC.                  
                                                            02-040         43,415                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-084            909                  07/02/10   11/22/10    BAST HATFIELD INC                   
                                                            03-011         27,851                  11/20/09   02/05/10    T. LEMME MECHANICAL INC             
                                                            03-012         18,685                  11/20/09     /  /      T. LEMME MECHANICAL INC             
                                                            03-013         14,744                  02/04/10   05/07/10    T. LEMME MECHANICAL INC             
                                                            03-016          7,683                  04/20/10   08/27/10    T LEMME MECHANICAL INC              
                                                            05-044          1,290                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            05-048          1,171                  04/20/10   08/27/10    HAROLD R CLUNE INC                  
                                                            06-002B            37                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
 
07-1629SC Visual Structural Inspection 0-002-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Poestenkill Elementary:
95-0891   Additions and Alterations    0-004-001  07/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0179   Reconstruction               0-004-002  12/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0038   Reconstruction               0-004-003  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          18,500                  01/12/07   01/18/07    Jupiter Environmental Services      
                                                            00003           9,500                  12/09/03   12/26/03    Harold R Clune                      
                                                            00003           3,920                  01/12/07   01/18/07    Jupiter Environmental Services      
                                                            00005          -2,174                  01/12/07   01/18/07    Jupiter Environmental Services      
                                                            00008           5,429                  12/09/03   12/30/03    Bunkoff General Contractors         
                                                            00009           2,491                  12/09/03   12/26/03    T. McElligott                       
                                                            00010           3,759                  12/09/03   03/12/04    T. McElligott                       
                                                            00011           1,725                  08/20/04   09/28/04    Harold R Clune                      
                                                            00012             170                  12/09/03   12/30/03    Bunkoff General Contractors         
                                                            00012             465                  05/27/04   06/07/04    T. McElligott                       
                                                            00015           1,770                  12/09/03   12/30/03    Bunkoff General Contractors         
                                                            00015             480                  08/20/04   09/28/04    Harold R Clune                      
                                                            00017           1,328                  09/28/04   10/04/04    James Maloy                         
                                                            00021          -1,623                  12/09/03   12/30/03    Bunkoff General Contractors         
                                                            00030           2,697                  08/20/04   09/27/04    Bunkoff General Contractors         
                                                            00040           4,174                  09/28/04   10/04/04    Bunkoff General Contractor          
 
07-0418   Reconstruction               0-004-004  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-016F        -1,080                  05/29/09   06/03/09    BAST HATFIELD INC                   
                                                            02-023          1,815                  03/26/09   05/21/09    BAST HATFIELD INC.                  
                                                            02-030          2,447                  03/26/09     /  /      BAST HATFIELD INC.                  
                                                            02-060          2,509                  10/30/09   12/29/09    BAST HATFIELD INC                   
                                                            02-062          1,667                  11/20/09   02/05/10    BAST HATFIELD INC                   
                                                            02-063          2,936                  11/20/09   02/05/10    BAST HATFIELD INC                   
                                                            02-066          1,114                  02/04/10   05/07/10    BAST HATFIELD INC                   
                                                            02-071          1,390                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            03-009          1,245                  10/30/09   12/29/09    T. LEMME MECHANICAL INC             
                                                            03-014          6,451                  03/09/10   05/28/10    T. LEMME MECHANICAL INC             
                                                            04-002          2,201                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            05-002          2,030                  10/06/08   10/30/08    HAROLD R. CLUNE                     
                                                            05-027          1,051                  10/30/09   12/29/09    HAROLD R CLUNE INC                  
                                                            05-041            576                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            06-001C           492                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            06-002E           299                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
 
12-0007   Reconstruction               0-004-005  08/24/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0461   Reconstruction               0-004-006  01/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-EC             977                  12/23/14   01/07/15    Harold R. Clune Inc.                
                                                            08-GC           5,190                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            10-GC          22,465                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            11-GC          14,798                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            12-GC           3,956                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            13-GC           4,090                  12/23/14   01/07/15    Titan Roofing, Inc.                 
                                                            15-GC          -2,900                  01/09/15   01/13/15    Titan Roofing, Inc.                 
 
13-0539   Reconstruction               0-004-007  05/27/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09-EC           1,248                  03/31/15   04/08/15    Harold R. Clune Inc.                
                                                            19-01           1,019                  10/28/16   11/17/16    M. Sullivan Construction            
                                                            26-EC             489                  01/11/16   01/21/16    HAROLD R. CLUNE INC.                
 
14-0210   Reconstruction               0-004-008  04/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06E               912                  12/07/15   01/05/16    FLEX ELCTRIC                        
                                                            D-01-MC         1,897                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
                                                            D-06-MC         4,549                  03/08/16   03/18/16    Eckert Mechanical Services Corp     
                                                            P-02            2,244                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP.    
 
16-1110   Reconstruction               0-004-009  03/21/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            20-001          5,048                  09/20/17   10/13/17    Flex Electric, LLC                  
 
21-1049   Reconstruction               0-004-010  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0937FP Reconstruction               0-004-FP1  01/13/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1630SC Visual Structural Inspection 0-004-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1698SC Visual Structural Inspection 0-004-SC2  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Sand Lake Elementary:
95-0194   Additions and Alterations    0-006-001  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0180   Reconstruction               0-006-002  12/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0039   Reconstruction               0-006-003  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00007           2,909                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00008           2,491                  12/09/03   01/08/04    T. McElligott                       
                                                            00012           1,725                  08/20/04   09/28/04    Harold R Clune                      
                                                            00015             465                  05/27/04   06/07/04    T. McElligott                       
                                                            00017             480                  08/20/04   09/28/04    Harold R Clune                      
                                                            00033           2,671                  08/20/04   09/27/04    Bunkoff General Contractors         
 
01-1507   Reconstruction               0-006-004  07/15/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004             553                  05/25/04   09/27/04    Trojon Hardware Co                  
                                                            00005             178                  05/25/04   06/04/04    Trojon Hardware Co                  
                                                            0001A            -184                  03/02/04   04/02/04    Magnum Services                     
                                                            TROJ-1          5,000                  03/02/04   04/02/04    Trojan Hardware Co                  
                                                            TROJ-2           -400                  03/02/04   04/02/04    Trojan Hardware Co                  
                                                            TROJ-3            240                  03/02/04   04/02/04    Trojan Hardware Co                  
 
07-0419   Reconstruction               0-006-007  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-005          6,993                  07/10/09   08/19/09    WB ROOFING & SHEETMETAL INC         
                                                            01-009            711                  10/30/09   12/29/09    WB ROOFING & SHEETMETAL INC         
                                                            02-005         15,435                  03/26/09   05/21/09    BAST HATFIELD INC.                  
                                                            02-016C        -1,680                  05/29/09   06/03/09    BAST HATFIELD INC                   
                                                            02-018            618                  03/26/09   05/20/09    BAST HATFIELD INC.                  
                                                            02-020          2,147                  03/26/09   04/23/09    BAST HASTFIELD INC.                 
                                                            02-037          6,110                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-038          9,643                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-086          1,455                  07/02/10   11/17/10    BAST HATFIELD INC                   
                                                            02-091          3,987                  06/30/11   09/13/11    BAST HATFIELD INC                   
                                                            03-001          1,505                  03/26/09   04/23/09    T. LEMME MECHANCIAL, INC.           
                                                            03-007            399                  10/30/09   12/29/09    T. LEMME MECHANICAL INC             
                                                            04-003            594                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-004            689                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-012            859                  03/26/09   11/26/12    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-020            325                  11/20/09     /  /      CAMPITO PLUMBING & HEATING INC      
                                                            05-009          2,428                  03/26/09   05/21/09    HAROLD R. CLUNE INC.                
                                                            05-010          9,852                  03/26/09   11/26/12    HAROLD R. CLUNE INC.                
                                                            05-029          1,163                  10/30/09   12/29/09    HAROLD R CLUNE INC                  
                                                            05-040            280                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            06-001B           400                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            06-002D           135                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            06-005            630                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
 
13-0462   Reconstruction               0-006-008  01/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-GC          -1,714                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            05-GC             658                  11/21/14   12/04/14    TITAN ROOFING,INC                   
 
13-0540   Reconstruction               0-006-009  05/27/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            05-EC           4,622                  03/31/15   04/08/15    Harold R Clune Inc                  
                                                            22-EC             823                  01/11/16   01/21/16    HAROLD R CLUNE INC                  
 
21-1050   Reconstruction               0-006-010  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0346   Reconstruction               0-006-012  12/30/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0936FP Reconstruction               0-006-FP1  01/13/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1684SC Visual Structural Inspection 0-006-SC1  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Algonguin Middle School:
95-1313   Additions and Alterations    0-009-001  06/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0181   Additions and Alterations    0-009-002  12/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0040   Additions and Alterations    0-009-003  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002               0                  12/09/03   12/26/03    Harold R. Clune                     
                                                            00002          16,356                  12/31/03   02/03/04    James Maloy                         
                                                            00004           6,764                  03/04/04   03/15/04    James Maloy                         
                                                            00005           5,980                  12/09/03   01/08/04    Harold R Clune                      
                                                            00005           7,352                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00005           2,416                  03/04/04   03/15/04    James Maloy                         
                                                            00006           7,354                  03/04/04   03/15/04    James Maloy                         
                                                            00007         -17,598                  09/28/04   10/04/04    James Maloy                         
                                                            00012           7,787                  09/28/04   04/24/06    James Maloy                         
                                                            00013           1,825                  09/28/04   10/14/04    James Maloy                         
                                                            00014          16,189                  09/28/04   10/14/04    James Maloy                         
                                                            00015           3,367                  09/28/04   10/14/04    James Maloy                         
                                                            00016           3,778                  09/28/04   10/14/04    James Maloy                         
                                                            00019          -2,000                  09/28/04   10/04/04    James Maloy                         
                                                            00020           1,680                  09/28/04   10/14/04    James Maloy                         
                                                            00021           1,225                  09/28/04   04/24/06    James Maloy                         
                                                            00022             622                  09/28/04   04/24/06    James Maloy                         
                                                            00023           3,000                  09/28/04   04/24/06    James Maloy                         
                                                            00024            -320                  09/28/04   10/04/04    James Maloy                         
                                                            00026           1,020                  09/28/04   10/14/04    James Maloy                         
                                                            00027          -8,400                  09/28/04   10/04/04    James Moloy                         
                                                            00028         -23,024                  09/28/04   10/04/04    James Maloy                         
                                                            00029           3,097                  09/28/04   10/14/04    James Maloy                         
                                                            00030         -47,694                  04/19/05   06/14/05    James Maloy                         
                                                            00035           5,020                  06/29/04   07/06/04    Bunkoff General Contractors         
                                                            00037          -1,718                  08/20/04   09/27/04    Bunkoff General Contractors         
                                                            00039           2,684                  08/20/04   09/27/04    Bunkoff General Contractors         
 
02-0492   Additions and Alterations    0-009-004  05/21/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            000001          8,435                  12/30/05   06/09/06    Rochester Flooring Resource         
                                                            00001           3,200                  12/13/04   12/24/04    Henderson Johnson Co                
                                                            00001           1,296                  12/13/04   12/24/04    Industrial Surfaces                 
                                                            00001           1,320                  03/02/05   04/28/05    Facilities Equipment Services       
                                                            00001           5,269                  09/29/05   10/13/05    Bruce Lawrence Painting Co          
                                                            00001           2,000                  09/29/05   10/13/05    David Browe Paving Contractors      
                                                            00001           4,002                  12/30/05   06/09/06    Atlantic Contracting Specialities   
                                                            00001           5,500                  12/30/05   06/09/06    Excel Insulation Co                 
                                                            00001           7,792                  01/26/06   07/24/06    Collins Concrete                    
                                                            00001          -1,045                  12/11/06   01/19/07    T Mc Elligott                       
                                                            00002           3,543                  03/02/04   04/23/04    DePoalo & Sons                      
                                                            00002           4,826                  12/13/04   12/24/04    Industrial Surfaces                 
                                                            00002           1,719                  12/13/04   02/11/05    T Lemme Mech.                       
                                                            00002           1,940                  09/29/05   10/14/05    Facilities Equipment Service        
                                                            00002           3,915                  12/30/05   06/09/06    Atlantic Contracting Specialities   
                                                            00002           5,000                  12/30/05   06/09/06    Excel Instulation                   
                                                            00003          11,074                  12/13/04   12/24/04    Industrial Surfaces                 
                                                            00003           2,801                  12/13/04   02/11/05    T Lemme Mech.                       
                                                            00003           2,310                  09/29/05   10/14/05    Facilities Equipement               
                                                            00003           1,500                  09/29/05   10/14/05    cornerstone Waterproofing           
                                                            00003          10,432                  12/30/05   06/09/06    Atlantic Contracting Specialities   
                                                            00003           2,200                  12/30/05   06/09/06    Excel Insulations Co                
                                                            00004           1,057                  12/13/04   12/24/04    Industrial Surfaces                 
                                                            00004             649                  12/13/04   02/11/05    T Lemme Mech.                       
                                                            00004             870                  12/30/05   06/09/06    Atlantic Contracting specialites    
                                                            00004           5,200                  12/30/05   06/09/06    Excel Insulation Co                 
                                                            00005             882                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00005               0                  09/13/04   04/24/06    Collett Mech.                       
                                                            00005             763                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00005           2,837                  12/13/04   02/11/05    T Lemme Mech.                       
                                                            00005           2,077                  12/30/05   06/09/06    Atlantic Contracting Specialities   
                                                            00005          -4,250                  12/30/05   06/09/06    Excel Insulation Co                 
                                                            00005           1,394                  12/30/05   06/09/06    Industrial Surfaces                 
                                                            00006           1,000                  09/13/04   10/14/04    Collett Mech.                       
                                                            00006         -11,735                  12/13/04   02/11/05    D&B Acoustical                      
                                                            00007           6,155                  09/13/04   04/24/06    Collett Mech.                       
                                                            00007           1,876                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00008             627                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00008           4,007                  12/13/04   02/11/05    Collett Mech.                       
                                                            00008           4,594                  03/02/05   07/01/05    T Lemme Mechanical                  
                                                            00009             441                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00009           3,459                  08/23/04   04/24/06    Collett Mech.                       
                                                            00010           3,263                  12/13/04   02/11/05    Collett Mech.                       
                                                            00011             689                  03/02/04   04/12/04    Flex Elec. Constructors             
                                                            00012             546                  05/25/04   06/10/04    DePoalo & Sons                      
                                                            00012           3,228                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00012             288                  12/13/04   02/11/05    Collett Mech.                       
                                                            00012          26,121                  09/29/05   11/14/05    T Lemme Mechanical                  
                                                            00013           1,404                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00013           2,006                  10/07/04   04/24/06    Collett Mech.                       
                                                            00014           2,261                  12/13/04   12/24/04    D&B Acoustical                      
                                                            00014           1,682                  12/13/04   02/11/05    Collett Mech.                       
                                                            00015          11,007                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00015           1,873                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00015           1,627                  12/13/04   02/11/05    Collett Mech.                       
                                                            00016          14,692                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00016           5,623                  10/07/04   04/24/06    Collett Mechanical, Inc.            
                                                            00017           1,031                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00017             301                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00017             178                  12/13/04   02/11/05    Collett Mech.                       
                                                            00018             935                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00018               0                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00018           1,357               3  12/13/04   02/11/05    Collett Mech.                       
                                                            00019               0                  09/13/04   10/14/04    DePoalo & Sons                      
                                                            00019           1,467                  12/13/04   02/11/05    Collett Mech.                       
                                                            00020           5,014                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00020             595                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00020             307                  12/13/04   02/11/05    Collett Mech.                       
                                                            00021           3,244                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00021               0                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00021             834                  12/13/04   02/11/05    Collett Mech.                       
                                                            00022           6,164                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00022           1,001                  09/13/04   10/26/04    DePoalo & Sons                      
                                                            00023           1,932                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00024               0                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00024             574                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00025               0                  05/25/04   06/10/04    Flex Elec. Constructors             
                                                            00026      -1,172,448                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00027           1,492                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00027           8,829                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00027          17,607                  09/29/05   01/17/06    Collett mechanical                  
                                                            00028             937                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00029           1,943                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00030             289                  09/13/04   10/04/04    DePoalo & Sons                      
                                                            00030           6,621                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00030           5,900                  09/29/05   04/24/06    Collett Mechanical, Inc.            
                                                            00032           3,884                  12/13/04   05/26/06    Flex Elec. Constructors             
                                                            00032         -43,250                  12/11/06   01/12/07    Collett Mechanical                  
                                                            00033          17,517                  08/16/04   04/24/06    Flex Elec. Constructors             
                                                            00033          -4,050                  12/13/04   02/11/05    DePoalo & Sons                      
                                                            00035             249                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00035            -219                  12/13/04   02/11/05    DePoalo & Sons                      
                                                            00036             392                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00037             215                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00042           4,457                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00043             219                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00044           3,059                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00047             581                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00048             693                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00049             315                  12/13/04   02/11/09    Flex Elec. Constructors             
                                                            00050             620                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00051             146                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00053           4,946                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00054             679                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00056           3,666                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            00059           1,187                  12/13/04   02/11/05    Flex Elec. Constructors             
                                                            A-36           -1,338                  03/02/05   03/31/05    Depoalo and Son Building            
                                                            A-4            -2,397                  03/02/04   04/13/04    DePoalo & Sons                      
                                                            A-41            7,432                  09/29/05   10/18/05    Depoalo and Son Builing             
                                                            AA-1            3,150                  09/29/05   10/13/05    T and P Lawn Lanscape               
                                                            AA-2           34,160                  09/29/05   10/13/05    T and P Lawn and Landscape          
                                                            B-24           35,454                  04/27/05     /  /      Collett Mechanical                  
                                                            B-25              229                  04/27/05   06/10/05    Collett Mechanical                  
                                                            B-28           -5,623                  09/29/05     /  /      Collett Mechanical                  
                                                            B-29           -1,420                  09/29/05     /  /      Collett mechanical                  
                                                            B-30            5,900                  09/29/05   12/13/11    Collett mechancial                  
                                                            C-7             3,662                  03/02/05   05/02/05    T Lemme Mechanical Inc              
                                                            D-10            3,067                  03/02/04   03/05/04    Flex Elec. Constructors             
                                                            D-12            2,010                  03/02/04   03/05/04    Flex Elec. Constructors             
                                                            D-13            1,501                  03/02/04   03/05/04    Flex Elec. Constructors             
                                                            D-14            1,384                  03/02/04   03/05/04    Flex Elec. Constructors             
                                                            D-2               251                  03/02/04     /  /      Flex Elec. Constructors             
                                                            D-6             6,068                  03/02/04   09/28/04    Flex Elec. Constructors             
                                                            D-61            4,153                  03/02/05   05/02/05    Flex electrical Constructors        
                                                            D-62              990                  03/02/05   05/02/05    Flex Electrical Constructors        
                                                            D-63              334                  03/02/05   05/02/05    Flex Electrical Constructors        
                                                            D-65              756                  03/02/05   04/28/05    Flex Electrical Constructor         
                                                            D-66              756                  03/02/05   04/28/05    Flex Electrical Constructors        
                                                            D-67              680                  04/27/05   06/10/05    Flex Electrical Constructors        
                                                            D-7             1,770                  03/02/04   05/06/04    Flex Elec. Constructors             
                                                            D-71           24,900                  09/29/05   04/12/06    Flex Electrical Constructors        
                                                            D-9               430                  03/02/04   03/05/04    Flex Elec. Constructors             
                                                            F-15            6,517                  03/02/05   03/31/05    D and B Acoustical                  
                                                            F-16            1,338                  03/02/05   03/24/05    D and B Acoustical                  
                                                            F-17            3,410                  03/02/05   03/24/05    D and B Acoustical                  
                                                            F-19              520                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-2             1,940                  04/27/05   06/10/05    Facilities Equipment Services       
                                                            F-20              838                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-21           16,752                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-22              581                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-25              471                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-27              976                  04/27/05   06/10/05    DandB Acoustical                    
                                                            F-29              713                  04/27/05   06/10/05    DandB Acoustical                    
                                                            G-1               215                  09/29/05   10/13/05    Cornerstone Waterproofing           
                                                            G-10             -291                  09/29/05     /  /      T lemme Mechanical                  
                                                            G-2               375                  09/29/05   10/13/05    Cornerstone Waterproofing           
                                                            G-8             4,594                  03/02/05     /  /      T Lemme mechanical Inc              
                                                            H-3            38,755                  03/02/05   03/31/05    Northeast Interior Systems          
                                                            H-5             1,649                  03/02/05   03/24/05    Northeast Interior Systems          
                                                            H-7             8,488                  09/29/05   10/13/05    Northeast Interior Systems          
                                                            N-1            11,660                  04/27/05   06/10/05    Architectural Glass Mirror          
                                                            N-2             4,390                  04/27/05     /  /      Architectrual Glass Mirror          
                                                            Q-2               750                  04/06/06     /  /      Henderson johnson Co                
                                                            W-1             1,650                  04/27/05   06/10/05    Forth Floor Company                 
                                                            W-2             1,500                  04/27/05   06/10/05    Forth Floor Company                 
                                                            X-1             1,256                  04/27/05   06/10/05    King Venetian                       
                                                            X-3             1,194                  04/27/05   06/10/05    King Venetian                       
                                                            Y-2            25,500                  01/26/06   07/24/06    David Browe paving                  
                                                            Y-3            11,200                  01/26/06   07/24/06    David browe Paving                  
 
02-2249   Reconstruction               0-009-005  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1281   Reconstruction               0-009-006  05/15/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001          8,496                  03/26/09   05/27/09    WB ROOFING & SHEETMETAL, INC.       
 
07-0420   Reconstruction               0-009-007  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-003         -6,500                  07/10/09     /  /      WB ROOFING & SHEETMETAL INC         
                                                            01-007            689                  10/30/09   12/29/09    WB ROOFING & SHEETMETAL INC         
                                                            01-008          1,892                  10/30/09   12/29/09    WB ROOFING & SHEETMETAL INC         
                                                            02-007         33,227                  03/26/09   05/19/09    BAST HATFIELD INC.                  
                                                            02-010          2,698                  03/26/09   05/19/09    BAST HATFIELD INC.                  
                                                            02-014          2,511                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-016B        -1,020                  05/29/09   06/03/09    BAST HATFIELD INC.                  
                                                            02-017          7,749                  03/26/09   05/19/09    BAST HATFIELD INC.                  
                                                            02-025          7,455                  03/26/09   05/19/09    BAST HATFIELD INC.                  
                                                            02-026         13,823                  03/26/09   05/19/09    BAST HATFIELD INC.                  
                                                            02-027          4,081                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-029          4,455                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-031          3,825                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-034          4,285                  03/26/09   05/05/09    BAST HATFIELD INC.                  
                                                            02-035          2,250                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-043          2,068                  07/10/09   09/23/09    BAST HATFIELD INC                   
                                                            02-045            703                  07/10/09     /  /      BAST HATFIELD INC                   
                                                            02-049          4,527                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-058         -6,000                  10/30/09   12/29/09    BAST HATFIELD INC                   
                                                            02-059          4,221                  10/30/09   12/29/09    BAST HATFIELD INC                   
                                                            02-073         12,009                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-075          3,743                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-081         57,490                  04/20/10   08/27/10    BAST HATFIELD INC                   
                                                            02-092          1,591                  09/22/11   12/20/11    BAST HATFIELD INC                   
                                                            03-006         35,109                  07/10/09     /  /      T LEMME MECHANICAL INC              
                                                            03-010          1,383                  11/20/09   02/05/10    T. LEMME MECHANICAL INC             
                                                            03-015          2,422                  03/09/10   05/28/10    T. LEMME MECHANICAL INC             
                                                            03-017          2,709                  09/15/10   12/17/10    T. LEMME MECHANICAL INC             
                                                            04-001           -475                  10/03/08   10/30/08    CAMPITO PLUMBING & HEATING INC.     
                                                            04-005            689                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-006          6,490                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-008          5,186                  03/26/09     /  /      CAMPITO PLUMBING & HEATING, INC.    
                                                            04-009          3,328                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-010          3,176                  03/26/09   11/26/12    CAMPITO  PLUMBING & HEATING, INC.   
                                                            04-011          4,497                  03/26/09   04/23/09    CAMPITO PLUMBING & HEATING, INC.    
                                                            04-016         22,608                  07/10/09     /  /      CAMPITO PLUMBING & HEATING INC      
                                                            04-018            964                  07/10/09   08/28/09    CAMPITO PLUMBING & HEATING INC      
                                                            05-001        134,000                  10/06/08   10/30/08    HAROLD R. CLUNE INC.                
                                                            05-005            670                  03/26/09   04/23/09    HAROLD R. CLUNE INC.                
                                                            05-007          2,778                  03/26/09   04/23/09    HAROLD R. CLUNE INC.                
                                                            05-019         -4,433                  07/10/09   08/19/09    HAROLD R CLUNE INC                  
                                                            05-031            477                  11/20/09   02/05/10    HAROLD R CLUNE INC                  
                                                            05-039            590                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            05-047          3,260                  04/20/10   08/27/10    HAROLD R CLUNE INC                  
                                                            05-050          2,331                  09/15/10   12/17/10    HAROLD R CLUNE INC                  
                                                            05-051            378                  09/15/10   12/17/10    HAROLD R CLUNE INC                  
                                                            06-004          3,518                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
 
13-0541   Reconstruction               0-009-009  05/27/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            08-EC           1,248                  03/31/15   04/08/15    Harold R. Clune Inc.                
                                                            21-EC           2,816                  01/11/16   01/21/16    HAROLD R. CLUNE INC                 
 
14-0211   Reconstruction               0-009-010  04/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01 G C D        1,304                  12/04/15   01/05/16    GALLO CONSTRUCTION CORP.            
                                                            01E               687                  10/09/15   10/28/15    Flex Electric                       
                                                            02E             1,251                  10/09/15   10/28/15    Flex Electric                       
                                                            04 G C D        1,313                  12/04/15   01/05/16    GALLO CONSTRUCTION CORP.            
                                                            05E             4,563                  12/04/15   01/05/16    FLEX ELECTRIC                       
                                                            08-GC             801                  12/07/15   01/05/16    GALLO CONSTRUCTION CORP.            
                                                            D-02-MC         2,833                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
                                                            D-04-MC           477                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICCES CORP    
                                                            P-03            6,777                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
                                                            P-06            5,232                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP.    
                                                            P-07           15,534                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP.    
 
18-1480   Reconstruction               0-009-011  03/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0551   Reconstruction               0-009-012  08/25/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0239   Reconstruction               0-009-013  11/08/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           6,000                  06/29/22   05/09/23    Alarm&Suppression Inc               
                                                            EC-02           6,500                  06/29/22   05/09/23    Alarm&Suppression Inc               
 
21-1179   Reconstruction               0-009-014  08/10/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1051   Reconstruction               0-009-015  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0496   Reconstruction               0-009-016  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0347   Reconstruction               0-009-017  12/30/22  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1697SC Visual Structural Inspection 0-009-SC1  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Miller Hill Elementary:
95-0554   Additions and Alterations    0-010-001  03/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1229   Reconstruction               0-010-002  06/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0041   Additions and Alterations    0-010-003  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,730                  12/09/03   02/04/04    T. McElligott                       
                                                            00001           1,905                  12/09/03   02/20/04    Bunkoff General Contractors         
                                                            00002           1,102                  12/09/03   02/04/04    T. McElligott                       
                                                            00005          11,569                  12/09/03   01/18/07    T. McElligott                       
                                                            00006           2,491                  12/09/03   02/04/04    T. McElligott                       
                                                            00009           1,985                  12/09/03   02/04/04    Harold R. Clune                     
                                                            00009           3,167                  12/09/03   02/20/04    Bunkoff General Contractors         
                                                            00014             699                  05/27/04   06/07/04    T. McElligott                       
                                                            00014           1,725                  08/20/04   09/28/04    Harold R Clune                      
                                                            00016             480                  08/20/04   09/28/04    Harold R Clune                      
                                                            00018           1,733                  12/09/03   02/20/04    Bunkoff General Contractors         
                                                            00031           4,576                  06/29/04   07/06/04    Bunkoff General Contractors         
                                                            00038             210                  08/20/04   09/27/04    Bunkoff General Contractors         
 
07-0421   Reconstruction               0-010-004  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-003           -600                  10/06/08   03/10/09    BAST HATFIELD INC.                  
                                                            02-011          2,729                  03/26/09   05/21/09    BAST HATFIELD INC.                  
                                                            02-016E           -35                  05/29/09   06/03/09    BAST HATFIELD INC                   
                                                            02-055         -2,528                  10/30/09   12/29/09    BAST HATFIELD INC                   
                                                            05-033          4,692                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            06-002A           441                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
 
13-0445   Reconstruction               0-010-005  02/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-EC             603                  11/21/14   12/03/14    J.MCBAIN ELECTRIC INC.              
                                                            01-MC          11,699                  11/21/14   12/03/14    MERIT PLUMBING & HEATING,LLC        
                                                            03-EC           2,007                  11/21/14   12/03/14    J.MCBCIN ELECTRIC INC.              
                                                            04-MC           1,313                  11/21/14   12/03/14    MERIT PLUMBING & HEATING,LLC        
                                                            06-MC           1,659                  01/09/15   08/11/15    Merit Plumbing & Heating, LLC       
 
13-0463   Reconstruction               0-010-006  01/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-EC           2,578                  12/23/14   01/07/15    Harold R. Clune Inc.                
                                                            03-GC           7,163                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            06-GC          10,726                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            07-GC           1,372                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            09-GC             791                  11/21/14   12/04/14    TITAN ROOFING,INC                   
                                                            14-GC             947                  01/09/15   01/13/15    Titan Roofing, Inc.                 
 
13-0542   Reconstruction               0-010-007  05/27/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            25-EC           1,564                  01/11/16   01/21/16    HAROLD R. CLUNE INC.                
 
14-0212   Reconstruction               0-010-008  04/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            D-03-MC         1,493                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
                                                            D-05-MC           593                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
                                                            P-01            1,824                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP.    
                                                            P-04             -860                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
                                                            P-08            1,333                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
 
21-1052   Reconstruction               0-010-009  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1685SC Visual Structural Inspection 0-010-SC1  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Geo Washington Sch-LsdToBOCES-SpecEd:
95-0892   Additions and Alterations    0-017-001  07/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0893   Reconstruction               0-017-002  07/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0183   Additions and Alterations    0-017-003  12/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0042   Additions and Alterations    0-017-004  01/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           7,435                  12/09/03   12/31/03    D&B Acoustical                      
                                                            00004             200                  12/09/03   01/13/04    Harold R. Clune                     
                                                            00006           2,545                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00011           8,697                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00011           3,618                  09/28/04   10/14/04    James Maloy                         
                                                            00013           1,281                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00014             773                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00019           5,170                  12/09/03   12/31/03    Bunkoff General Contractors         
                                                            00024           3,017                  12/31/03   01/16/04    Bunkoff General Contractors         
                                                            00034           2,054                  06/29/04   07/06/04    Bunkoff General Contractors         
 
07-0422   Reconstruction               0-017-005  02/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-016D          -204                  05/29/09   06/03/09    BAST HATFIELD INC                   
                                                            02-054         21,084                  07/10/09   08/19/09    BAST HATFIELD INC                   
                                                            02-074          1,346                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            02-077          1,371                  03/09/10   05/28/10    BAST HATFIELD INC                   
                                                            04-019            749                  10/30/09   12/29/09    CAMPITO PLUMBING & HEATING INC      
                                                            05-025          1,424                  10/30/09   12/29/09    HAROLD R CLUNE INC                  
                                                            05-035            755                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            05-037          2,848                  02/04/10   05/07/10    HAROLD R CLUNE INC                  
                                                            05-043          1,681                  03/09/10   05/28/10    HAROLD R CLUNE INC                  
                                                            06-001A           400                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            06-002F           448                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            06-006            761                  11/15/10   12/01/10    SCHENECTADY HARDWARE & ELECTRIC     
 
13-0464   Reconstruction               0-017-006  01/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-GC          10,726                  11/21/14   12/08/14    TITAN ROOFING,INC                   
                                                            02-PC           5,983                  11/21/14   12/08/14    MERIT PLUMBING & HEATING,LLC        
                                                            03-EC             828                  12/23/14   01/07/15    Harold R. Clune Inc.                
                                                            03-PC           1,205                  12/23/14   01/07/15    Merit Plumbing & Heating, LLC       
                                                            04-GC           2,625                  11/21/14   12/08/14    TITAN ROOFING,INC                   
 
14-0213   Reconstruction               0-017-007  04/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02 G C D        1,144                  12/04/15   01/05/16    GALLO CONSTRUCTION CORP.            
                                                            05 G C D        1,220                  12/04/15   01/05/16    GALLO CONSTRUCTION CORP.            
                                                            P-05              398                  12/07/15   01/05/16    ECKERT MECHANICAL SERVICES CORP     
 
21-1053   Reconstruction               0-017-008  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1628SC Visual Structural Inspection 0-017-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
96-0670   New Construction             5-016-001  02/14/97  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1748   Reconstruction               5-016-002  06/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0877   Reconstruction               5-016-003  03/10/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06-002C           101                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            06-003          2,378                  10/25/10   01/07/11    SCHENECTADY HARDWARE & ELECTRIC     
 
13-0465   Reconstruction               5-016-004  01/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-PC             677                  11/21/14   12/08/14    MERIT PLUMBING & HEATING,LLC        
 
13-0543   Reconstruction               5-016-005  05/27/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10-EC             625                  03/31/15   04/08/15    Harold R Clune Inc                  
 
21-1054   Reconstruction               5-016-006  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0348   Reconstruction               5-016-007  12/30/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1774   Reconstruction               5-016-008  02/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1631SC Visual Structural Inspection 5-016-SC1  02/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1695SC Visual Structural Inspection 5-016-SC2  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1696SC Visual Structural Inspection 5-016-SC3  06/18/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          High Sch Press Box -ToBeDemo'd:
22-0497   Reconstruction               7-022-002  12/05/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Greenhouse # Highschool:
09-1355   New Construction             7-024-001  05/26/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
22-0964   New Construction             7-025-001  11/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
17-1899   Reconstruction               7-999-001  05/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE

HOOSIC VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-14-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Elementary School:
94-0740   Additions and Alterations    0-001-001  03/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1311   Reconstruction               0-001-002  05/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1715   Additions and Alterations    0-001-003  07/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0722   Additions and Alterations    0-001-004  05/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0252   Reconstruction               0-001-005  10/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1164   Reconstruction               0-001-006  09/11/13  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0473   Additions and Alterations    0-001-007  02/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-07          -1,250                  11/12/08   02/27/09    SHAKER FLATS LANDDSCAPING INC.      
                                                            01-09           2,179                  10/20/08   11/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            01-1          -42,023                  11/12/08   12/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            01-10          42,694                  10/20/08   11/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            01-18          10,000                  07/09/09     /  /      SHAKER FLATS LANDSCAPING INC        
                                                            01-2          -14,786                  11/12/08   12/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            01-20           2,347                  07/24/09   08/17/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-21           1,249                  07/24/09   08/17/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-23          -3,400                  10/08/09   10/30/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-24          -1,500                  07/24/09   08/17/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-26           2,993                  10/08/09   10/30/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-27          24,104                  10/08/09   11/06/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-28          14,700                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-3          -19,675                  11/12/08   12/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            01-34             105                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-37           3,870                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-38          -1,400                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-39           2,170                  03/31/10   05/21/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-4          -21,750                  11/12/08   12/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            01-42          12,500                  03/01/10   04/30/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-43          -2,372                  03/01/10   04/30/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-5          -16,950                  11/12/08   12/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            01-6          -21,750                  11/12/08   12/10/08    SHAKER FLATS LANDSCAPING INC.       
                                                            02-10           6,571                  12/01/08   01/12/09    EASTERN BUILDING RESTORATION        
                                                            02-17           1,286                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            02-19           2,047                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            03-02           3,126                  12/01/08   05/19/09    DIGESARE MECHANCIAL,INC.            
                                                            03-03           2,157                  12/03/08   05/19/09    DIGESARE MECHANCIAL, INC.           
                                                            03-07             867                  10/08/09   10/30/09    DIGESARE MECHANICAL INC             
                                                            03-1           26,037                  09/18/08   06/25/10    DiGesare Mechanical inc             
                                                            05-05             735                  12/03/08   05/19/09    HAROLD R. CLUNE INC.                
                                                            05-09           1,243                  04/23/09   07/22/09    HAROLD R. CLUNE INC                 
                                                            05-21           1,803                  11/30/09   02/02/10    HAROLD R CLUNE INC                  
                                                            05-22           1,713                  11/30/09   02/02/10    HAROLD R CLUNE INC                  
 
06-0559   Reconstruction               0-001-008  12/18/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0927   Reconstruction               0-001-009  06/21/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-2            2,539                  06/23/08   08/26/08    Duncan & Cahill                     
                                                            02-1           -3,735                    /  /     01/23/09    Dunham Electric                     
                                                            02-2            2,000                    /  /     01/23/09    Dunham Electric                     
                                                            02-3             -145                  06/23/08   01/23/09    Dunham Electric                     
                                                            02-4           -1,078                    /  /     01/23/09    Dunham Electric                     
                                                            02-5            6,000                    /  /     01/23/09    Dunham Electric                     
 
15-0614   Reconstruction               0-001-011  12/14/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1241   Reconstruction               0-001-012  03/24/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R1-01           1,035                  01/11/16   01/21/16    TITAN ROOFING,INC.                  
 
16-1260   Reconstruction               0-001-013  05/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD01A001            0                  02/01/18   02/21/18    CMK Electrical Services, Inc.       
                                                            AD01A002            0                  02/01/18   02/21/18    CMK Electrical Services, Inc.       
                                                            AD01A003            0                  02/01/18   02/21/18    CMK Electrical Services, Inc.       
                                                            CO1-001        14,369                  02/01/18   02/21/18    CMK Electrical Services, Inc.       
                                                            CO1-002         1,269                  02/01/18   06/19/19    CMK Electrical Services, Inc.       
 
16-1029   Reconstruction               0-001-014  01/12/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1692   Reconstruction               0-001-015  05/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1367FA Additions and Alterations    0-001-016  12/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1237   Reconstruction               0-001-017  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2477   Reconstruction               0-001-018  07/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Junior Senior High School:
92-1574   Reconstruction               0-002-005  06/24/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1312   Reconstruction               0-002-006  05/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0723   Reconstruction               0-002-007  05/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0129   Reconstruction               0-002-008  09/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1211   Reconstruction               0-002-010  05/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-1            1,265                  09/10/05   09/12/05    WeatherGuard Industries             
                                                            01-2            1,520                  09/10/05   09/12/05    Weather Guard Industries            
                                                            02-1              300                  09/27/05   10/04/05    Mazone Plumbing Heating             
                                                            03-1            5,595                  10/31/05   05/25/06    Douglas Dyer and Sons               
                                                            04-1            1,600                  01/05/06   08/21/06    CT Male Associates                  
                                                            05-1            5,350                  10/31/05   11/07/05    Dona Tech inc                       
                                                            06-1            1,590                  10/31/05   11/07/05    Flooring Environment                
                                                            CO-07-1           693                  10/31/05   11/07/05    Rochester Flooring Resource         
 
12-1165   Reconstruction               0-002-012  07/18/13  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0474   Additions and Alterations    0-002-013  02/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-11             548                  12/01/08   01/12/09    SHAKER FLATS LANDSDCAPING INC.      
                                                            01-12           1,380                  12/01/08   01/12/09    SHAKER FLATS LANDSCAPING INC.       
                                                            01-13             723                  12/01/08   05/19/09    SHAKER  FLATS LANDSCAPING INC.      
                                                            01-14           9,827                  12/01/08   05/19/09    SHAKER FLATS LANDSCAPING INC.       
                                                            01-15           2,057                  05/08/09   07/28/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-16          -1,834                  05/08/09   07/28/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-17          -3,740                  05/08/09   07/28/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-19           3,313                  07/24/09   08/17/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-22           1,985                  07/24/09   08/17/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-25             668                  07/24/09   08/17/09    SHAKER FLATS LANDSCAPING INC        
                                                            01-29          14,910                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-30          14,490                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-31          10,710                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-32           4,200                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-33           3,444                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-35           1,408                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-36           1,486                  12/24/09   02/22/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-40             626                  03/31/10   05/21/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-41           4,665                  03/31/10   05/21/10    SHAKER FLATS LANDSCAPING INC        
                                                            01-8            2,888                  10/20/08   05/14/09    SHAKER FLATS LANDSCAPING INC.       
                                                            02-05             593                  12/01/08   01/12/09    EASTERN BUILDING RESTORATION        
                                                            02-06           1,458                  12/01/08   01/12/09    EASTERN BUILDING RESTORATION        
                                                            02-07           3,039                  12/01/08   01/12/09    EASTERN BUILDING RESTORATION        
                                                            02-08           1,957                  12/01/08   01/12/09    EASTERN BUILDING RESTORATION        
                                                            02-09             727                  12/01/08   01/12/09    EASTERN BUILDING RESTORATION        
                                                            02-1          -20,626                  07/15/08   08/26/08    EASTERN BUILDING & RESTORATION, INC.
                                                            02-11           2,684                  12/01/08   01/12/09    EASTERN BUILDING RESTORATION        
                                                            02-12          23,881                  12/10/08   01/21/09    EASTERN BUILDING RESTORATION        
                                                            02-13             701                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            02-14           1,552                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            02-15         -28,551                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            02-16           2,196                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            02-18           5,347                  08/07/09   09/02/09    EASTERN CONSTRUCTION RESTORATION    
                                                            02-2          -10,710                  07/15/08   08/26/08    EASTERN BUILDING & RESTORATION, INC.
                                                            02-20             402                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            02-21          -1,280                  08/07/09   09/02/09    EASTERN BUILDING RESTORATION        
                                                            02-22             990                  08/07/09   09/01/09    EASTERN BUILDING RESTORATION        
                                                            02-23           1,864                  08/07/09   09/01/09    EASTERN BUILDING RESTORATION        
                                                            02-24           1,180                  08/07/09   09/01/09    EASTERN BUILDING RESTORATION        
                                                            02-25          -1,903                  08/07/09   09/01/09    EASTERN BUILDING RESTORATION        
                                                            02-26             575                  08/07/09   09/01/09    EASTERN BUILDING RESTORATION        
                                                            02-27             850                  08/07/09   09/01/09    EASTERN BUILDING RESTORATION        
                                                            02-28             816                  08/07/09   09/04/09    EASTERN BUILDING RESTORATION        
                                                            02-29          -5,000                  08/07/09   09/04/09    EASTERN BUILDING RESTORATION        
                                                            02-3           -1,150                  07/15/08   04/07/09    EASTERN BUILDING & RESTORATION, INC.
                                                            02-30           8,260                  08/07/09   09/04/09    EASTERN BUILDING RESTORATION        
                                                            02-31            -758                  08/07/09   09/04/09    EASTERN BUILDING RESTORATION        
                                                            02-33            -108                  06/07/10   08/04/10    EASTERN BUILDING RESTORATION        
                                                            02-34           1,192                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-35           1,246                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-36           1,979                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-37           8,710                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-38             674                  06/07/10   08/04/10    EASTERN BUILDING RESTORATION        
                                                            02-39             609                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-4           -5,683                  07/15/08   08/26/08    EASTERN BUILDING & RESTORATION, INC.
                                                            02-40           1,792                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-41             455                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-42           1,192                  12/24/09   02/22/10    EASTERN BUILDING RESTORATION        
                                                            02-44             882                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-45           2,062                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-46           2,629                  12/24/09   02/22/10    EASTERN BUILDING RESTORATION        
                                                            02-47           2,874                  12/24/09   02/17/10    EASTERN BUILDING RESTORATION        
                                                            02-48           4,209                  12/24/09   02/17/10    EASTERN BUILDING RESTORATION        
                                                            02-49           2,745                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-50           8,121                  11/30/09   12/31/09    EASTERN BUILDING RESTORATION        
                                                            02-51           3,940                  12/24/09   02/17/10    EASTERN BUILDING RESTORATION        
                                                            02-53           1,239                  01/25/10   03/08/10    EASTERN BUILDING RESTORATION        
                                                            02-54           7,482                  01/25/10   03/08/10    EASTERN BUILDING RESTORATION        
                                                            02-55          -5,000                  01/25/10   03/08/10    EASTERN BUILDING RESTORATION        
                                                            02-57             697                  03/01/10   04/30/10    EASTERN BUILDING RESTORATION        
                                                            02-58           3,391                  03/01/10   04/30/10    EASTERN BUILDING RESTORATION        
                                                            02-59             945                  03/01/10   04/30/10    EASTERN BUILDING RESTORATION        
                                                            02-60           5,484                  03/01/10   04/30/10    EASTERN BUILDING RESTORATION        
                                                            02-61          -2,000                  03/01/10   04/30/10    EASTERN BUILDING RESTORATION        
                                                            02-64         -23,800                  06/07/10   08/04/10    EASTERN BUILDING RESTORATION        
                                                            02-71             507                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-72            -600                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-73          -1,286                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-74           3,770                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-75          -3,500                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-76          -1,800                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-77            -750                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-78          -2,200                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-79            -200                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-80          -3,000                  02/06/12     /  /      EASTERN BUILDING RESTORATION        
                                                            02-81            -150                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-82            -500                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-83          -3,375                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-84          -1,839                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-85            -385                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-86            -674                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            02-87         -26,566                  02/06/12   05/14/12    EASTERN BUILDING RESTORATION        
                                                            03-04           2,214                  10/08/09   10/30/09    DIGESARE MECHANICAL INC             
                                                            03-05           3,557                  10/08/09   10/30/09    DIGESARE MECHANICAL INC             
                                                            03-06             925                  10/08/09   10/30/09    DIGESARE MECHANICAL INC             
                                                            03-08           1,211                  10/08/09   10/30/09    DIGESARE MECHANICAL INC             
                                                            03-09             935                  10/08/09   10/30/09    DIGESARE MECHANICAL INC             
                                                            03-10            -668                  10/08/09   10/30/09    DIGESARE MECHANICAL INC             
                                                            03-11           2,907                  11/30/09   12/31/09    DIGESARE MECHANICAL INC             
                                                            03-12           1,220                  11/30/09   02/10/12    DIGESARE MECHANICAL INC             
                                                            03-13           1,611                  11/30/09   12/31/09    DIGESARE MECHANICAL INC             
                                                            03-14           2,540                  11/30/09   12/31/09    DIGESARE MECHANICAL INC             
                                                            03-15           1,839                  11/30/09   12/31/09    DIGESARE MECHANICAL INC             
                                                            03-16             414                  11/30/09   01/04/10    DIGESARE MECHANICAL INC             
                                                            03-17           4,641                  11/30/09   01/04/10    DIGESARE MECHANICAL INC             
                                                            04-05          14,932                  12/01/08   05/19/09    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            04-06           1,241                  12/01/08   05/19/09    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            04-07             672                  10/08/09   10/30/09    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-08             252                  10/08/09   10/30/09    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-09           5,851                  01/12/10   02/22/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-1          -31,450                  09/12/08   07/08/09    Tri-Valley Plumbing & Heating       
                                                            04-10           1,514                  10/08/09   10/30/09    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-11           4,443                  01/12/10   02/22/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-12           3,375                  01/12/10   02/22/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-13             328                  01/12/10   02/22/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-14             415                  01/12/10   02/22/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-15           1,116                  01/12/10   02/22/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-16           6,954                  01/19/10   03/04/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-17            -367                  01/19/10   03/04/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-18         -10,350                  01/19/10   03/04/10    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-19           3,926                  09/22/11   11/08/11    TRI-VALLEY PLUMBING & HEATING INC   
                                                            04-2          -13,369                  09/12/08   07/08/09    Tri-Valley Plumbing & Heating       
                                                            04-3          -20,863                  09/12/08   07/08/09    Tri-Valley Plumbing & Heating       
                                                            04-4           -9,797                  09/12/08   07/08/09    Tri-Valley Plumbing & Heating       
                                                            05-06             415                  12/03/08   05/19/09    HAROLD R. CLUNE, INC.               
                                                            05-07             992                  12/03/08   05/04/11    HAROLD R. CLUNE INC.                
                                                            05-08           1,493                  12/03/08   05/19/09    HAROLD R. CLINE INC.                
                                                            05-1           -8,150                  07/15/08   05/11/09    HAROLD R. CLUNE, INC.               
                                                            05-10           2,825                  04/23/09   07/22/09    HAROLD R. CLUNE INC                 
                                                            05-11          10,000                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-12           1,530                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-13           1,268                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-14           2,675                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-15           1,131                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-16           1,759                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-17             555                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-18           1,443                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-19           4,012                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-2           -1,228                  07/15/08   05/11/09    HAROLD R. CLUNE, INC.               
                                                            05-20          -3,889                  10/08/09   10/30/09    HAROLD R. CLUNE INC                 
                                                            05-23           1,873                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-24           6,012                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-25           2,020                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-26             843                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-27           4,120                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-28         -10,000                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-29         -10,500                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-3          -21,000                  07/15/08   05/11/09    HAROLD R. CLUNE, INC.               
                                                            05-30          17,250                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-31             689                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-32             545                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-33           1,189                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-34             214                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-35           1,740                  11/30/09   02/02/10    HAROLD R. CLUNE INC                 
                                                            05-36          13,165                  03/01/10   04/30/10    HAROLD R CLUNE INC                  
                                                            05-37           6,608                  03/01/10   04/30/10    HAROLD R CLUNE INC                  
                                                            05-38             688                  03/01/10   04/30/10    HAROLD R CLUNE INC                  
                                                            05-39           7,792                  03/01/10   04/30/10    HAROLD R CLUNE INC                  
                                                            05-4          -28,614                  07/15/08   05/11/09    HAROLD R. CLUNE, INC.               
                                                            05-40           4,288                  03/01/10   04/30/10    HAROLD R CLUNE INC                  
                                                            05-41             919                  03/18/10   05/25/10    HAROLD R. CLUNE INC.                
                                                            05-42             940                  02/09/11   05/04/11    HAROLD R CLUNE INC                  
                                                            10-01           1,100                  07/27/10   09/07/10    MID-STATE INDUSTRIES LTD            
                                                            10-01           1,100                  09/07/10   09/27/10    MID-STATE INDUSTRIES LTD            
                                                            10-02           7,820                  08/12/10   09/10/10    MID-STATE INDUSTRIES LTD            
                                                            10-02           7,820                  09/07/10     /  /      MID-STATE INDUSTRIES LTD            
                                                            10-03            -500                  05/11/11   06/10/11    MID-STATE INDUSTRIES LTD            
                                                            11-01           8,407                  01/28/11   02/25/11    GIAGRANDE CONSTRUCTION INC          
                                                            11-02          24,260                  01/28/11   02/25/11    GIANGRANDE CONSTRUCTION INC         
                                                            11-03           3,425                  09/22/11   11/04/11    GIANGRANDE CONSTRUCTION INC         
 
05-0703   Reconstruction               0-002-014  03/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-1           -8,000                  11/28/06   01/09/07    Quaker bay                          
 
06-0928   Reconstruction               0-002-015  06/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0105   Reconstruction               0-002-018  08/02/13  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0986   Reconstruction               0-002-019  04/16/13  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1693   Reconstruction               0-002-020  05/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1542   Reconstruction               0-002-021  06/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1368FA Additions and Alterations    0-002-023  12/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1238   Reconstruction               0-002-024  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1584FP Reconstruction               0-002-FP1  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0278SC Visual Structural Inspection 0-002-SC1  09/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1348SC Visual Structural Inspection 0-002-SC2  05/22/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          XX Wanko Building (demo'd 08/2018):
17-0572   Reconstruction               1-006-001  10/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Transportation Facility:
99-1445   New Construction             5-009-001  07/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0704   Reconstruction               5-009-002  03/30/06  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1369   Reconstruction               5-009-004  12/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1239   Reconstruction               5-009-005  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Districtwide:
12-1334   Reconstruction               7-999-002  10/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE

SCHODACK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-15-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Castleton Elementary:
91-1407   Reconstruction               0-001-008  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0524   Additions and Alterations    0-001-009  01/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1334   Reconstruction               0-001-010  05/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1535   New Construction             0-001-014  06/26/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  07/01/11   07/18/11    SANO-RUBIN CONSTRUCTION CO          
                                                            002                 0                  01/30/08   03/08/08    sano rubin construction             
                                                            003                 0                  01/03/08   03/08/08    sano rubin construction             
                                                            004                 0                  01/30/08   03/08/08    sano rubin construction             
                                                            005                 0                  07/01/08   10/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            006                 0                  05/14/08   08/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            007                 0                  01/30/08   03/08/08    sano rubin construction             
                                                            008                 0                  03/20/08   08/18/08    Sano - Rubin Construction Comp.     
                                                            009                 0                  05/14/08   08/04/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            010                 0                  02/16/09   06/10/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            011                 0                  03/16/09   06/10/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            012                 0                  02/16/09   06/10/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            013                 0                  02/16/09   06/10/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            014                 0                  04/01/08   04/02/08    SANO-RUBIN CONSTRUCTION             
                                                            015                 0                  04/01/08   04/02/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            016            -1,000                  04/01/08   04/02/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            017              -775                  04/01/08   04/02/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            018                 0                  05/14/08   08/04/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            019                 0                  05/14/08   08/04/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            020                 0                  05/14/08   08/04/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            021                 0                  05/14/08   08/04/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            022                 0                  05/14/08   08/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            023                 0                  05/15/08   08/07/08    SANO-RUBIN CONSTRUCTION  CO.        
                                                            024                 0                  07/01/08   10/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            025                 0                  07/01/08   10/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            026                 0                  07/01/08   10/07/08    SANO-RUBIN CONSTRUCTION CO          
                                                            027                 0                  08/27/08   10/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            028                 0                  08/27/08   10/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            029                 0                  08/27/08   10/07/08    SANO-RUBIN CONSTRUCTION CO.         
                                                            030                 0                  09/25/08   01/27/09    SANO - RUBIN CONSTRUCTION CO.       
                                                            031                 0                  09/25/08   01/27/09    SANO - RUBIN CONSTRUCTIN CO.        
                                                            032                 0                  09/12/08   12/01/08    SANO - RUBIN CONSTRUCTION CO.       
                                                            033                 0                  07/01/11   07/18/11    SANO - RUBIN CONSTRUCTION CO.       
                                                            034                 0                  09/25/08   01/27/09    SANO - RUBIN CONSTRUCTION           
                                                            035                 0                  09/25/08   01/27/09    SANO - RUBIN CONSTURCTION CO.       
                                                            036                 0                  10/23/08   11/06/08    SANO - RUBIN CONSTRUCTION CO.       
                                                            037                 0                  10/23/08   03/19/09    SANO - RUBIN CONSTRUCTION CO.       
                                                            038                 0                  10/23/08   03/19/09    SANO - RUBIN CONSTRUCTION CO.       
                                                            039                 0                  10/23/08   03/19/09    SANO - RUBIN CONSTRUCTION CO.       
                                                            040                 0                  10/23/08   03/19/09    SANO - RUBIN CONSTRUCTION CO.       
                                                            041                 0                  10/23/08   03/19/09    SANO - RUBIN CONSTRUCTION CO.       
                                                            042                 0                  12/03/08   04/06/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            043                 0                  12/03/08   04/03/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            044                 0                  12/03/08   04/03/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            045                 0                  12/29/08   01/27/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            046                 0                  12/29/08   01/27/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            047                 0                  12/29/08   01/27/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            048                 0                  12/29/08   01/27/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            049                 0                  12/29/08   01/27/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            050            19,879                  12/29/08   01/27/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            051                 0                  01/22/09   03/05/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            052                 0                  01/22/09   03/05/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            053                 0                  01/22/09   03/05/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            054                 0                  03/12/09   06/25/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            055             7,452                  03/12/09   06/25/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            056            10,829                  03/12/09   06/25/09    SANO-RUBIN CONSTRUCTION             
                                                            057             3,110                  03/12/09   06/25/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            058               745                  05/07/09   07/30/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            059             3,187                  05/07/09   07/30/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            060            -1,275                  05/07/09   07/30/09    SANO-RUBIN CONSTRUCTION CO.         
                                                            061               -12                  01/27/10   05/27/10    SANO-RUBIN CONSTRUCTION CO          
                                                            E-001               0                  03/31/08   08/12/08    ARCON CONSTRUCTION & MANAGEMENT SVCS
                                                            E-002               0                  07/21/10   09/10/10    ARCON CONSTRUCTION & MNGMNT SVCS INC
                                                            E-003               0                  07/21/10   09/10/10    ARCON CONSTRUCTION & MNGMNT SVCS INC
                                                            E-004               0                  05/14/08   02/23/09    ARCON CONSTRUCTION & MANAGEMENT SERV
                                                            E-005               0                  07/21/10   09/10/10    ARCON CONSTRUCTION & MGMNT SVCS INC 
                                                            E-006               0                  07/21/10   09/10/10    ARCON CONSTRUCTION & MANAGEMENT SVCS
                                                            E-007               0                  05/14/08   02/23/09    ARCON CONSTRUCTION & MANAGEMENT SERV
                                                            E-008         -15,200                  05/14/08   02/23/09    ARCON CONSTRUCTION MANAGEMENT SERVIC
                                                            E-009               0                  07/01/08   05/11/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E-010               0                  08/27/08   07/08/09    ARCON Construction & Management     
                                                            E-011               0                  08/27/08   06/18/09    Arcon Construction & Management     
                                                            E-012               0                  08/27/08   06/18/09    ARCON Construction & Management     
                                                            E-014           2,437                  12/29/08   01/21/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E-015           6,744                  12/29/08   04/29/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E-016           9,365                  12/29/08   04/30/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E-017           7,968                  03/12/09   06/25/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E-018           1,227                  03/12/09   06/25/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E-020          -1,275                  05/07/09   07/28/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E-13            5,295                  09/25/08   04/23/09    ARCON CONSTRUCTION & MANAGEMENT SERV
                                                            E-19           10,171                  05/07/09   07/28/09    ARCON CONSTRUCTION & MANAGEMENT     
                                                            E001                0                  01/30/08   08/04/08    mazone plumbing                     
                                                            M-001               0                  05/28/08   03/06/09    T.Lemme Mechanical,Inc              
                                                            M-002               0                  05/28/08   03/06/09    T.Lemme Mechanical,Inc              
                                                            M-003               0                  07/01/08   05/11/09    T. Lemme Mechanical                 
                                                            M-004               0                  07/02/08   05/11/09    T. Lemme Mechanical                 
                                                            M-005               0                  07/01/08   05/11/09    T. Lemme Mechanical                 
                                                            M-006               0                  08/27/08   10/07/08    T.Lemme Mechanical, Inc.            
                                                            M-007               0                  12/03/08   07/18/11    T. LEMME MECHANCIAL INC.            
                                                            M-007               0                  07/01/11     /  /      T. LEMME MECHANICAL INC             
                                                            M-008               0                  03/12/09   06/25/09    T. LEMME MECHANICAL INC.            
                                                            M-009         -95,700                  05/07/09   07/30/09    T. LEMME MECHANICAL INC.            
                                                            M-010          -1,275                  05/07/09   07/30/09    T. LEMME MECHANICAL INC.            
                                                            M-011         -50,000                  04/29/10   07/21/10    T. LEMME MECHANICAL INC             
                                                            M-012         -55,832                  04/29/10   07/21/10    T. LEMME MECHANICAL INC             
                                                            P-003               0                  03/20/08   07/02/09    Mazone Plumbing                     
                                                            P-004               0                  07/21/10   09/10/10    MAZONE PLUMBING                     
                                                            P-005               0                  07/21/10   09/10/10    MAZONE PLUMBING                     
                                                            P-006               0                  08/27/08   06/18/09    Mazone Plumbing                     
                                                            P-007           1,771                  08/27/08   06/18/09    Mazone Plumbing                     
                                                            P-008           1,061                  12/29/08   01/21/09    MAZONE PLUMBING                     
                                                            P-009           2,904                  03/12/09   07/16/09    MAZONE PLUMBING                     
                                                            P-010           2,280                  03/12/09   07/16/09    MAZONE PLUMBING                     
                                                            P-011          -1,275                  05/07/09   07/30/09    MAZONE PLUMBING                     
                                                            P002           46,011                  01/30/08   08/04/08    mazone plumbing                     
                                                            T001            2,800                  06/03/10   12/10/10    TROJAN ENERGY SYSTEMS               
 
11-0516   Reconstruction               0-001-015  01/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1926   Reconstruction               0-001-016  10/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ECCO-8            668                  01/09/19   02/12/19    J.MCBAIN, INC.                      
                                                            GC-24          11,490                  01/09/19   02/08/19    BCI CONSTRUCTION INC.               
                                                            GCCO-26        31,914                  01/09/19   02/08/19    BCI CONSTRUCTION INC.               
                                                            SCCO-2            869                  01/09/19   02/12/19    ADIRONDACK CABLING AND SECURITY     
                                                            SCCO-3          3,428                  01/09/19   02/12/19    ADIRONDACK CABLING AND SECURITY     
 
17-1856   Reconstruction               0-001-017  07/02/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO1         -5,000                  12/10/18   01/18/19    WM. J. KELLER & SONS CONSTRUCTION   
 
21-0115   Reconstruction               0-001-018  08/29/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -5,000                  06/27/22   04/10/23    Akros Managmt Inc                   
 
22-1703   Reconstruction               0-001-019  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1306   Reconstruction               0-001-020  05/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maple Hill High School (G7-12):
91-1408   Reconstruction               0-002-008  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0525   Additions and Alterations    0-002-010  01/10/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -7,450                  06/24/04   06/28/04    Weisburgh Mech.                     
 
97-1335   Reconstruction               0-002-011  05/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0276   Reconstruction               0-002-012  10/14/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0783   Reconstruction               0-002-013  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1350   Reconstruction               0-002-014  05/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0555   Reconstruction               0-002-015  12/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,223                  11/22/02   12/06/02    Lash Contracting                    
                                                            2               2,085                  06/11/03   06/11/03    Lash Contracting                    
 
05-0231   Reconstruction               0-002-016  12/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               750                  11/29/06   01/09/07    Edgecco Environmental               
 
07-0661   Reconstruction               0-002-017  12/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-008               0                  03/16/09   06/23/09    BROWNELL ELECTRIC CORP.             
                                                            E-010          -6,552                  03/16/09   06/24/09    BROWNELL ELECTRIC CORP.             
                                                            E-012               0                  08/27/09   09/16/09    BROWNELL ELECTRIC CORP              
                                                            E-014               0                  08/27/09   08/31/12    BROWNELL ELECTRIC CORP              
                                                            E-015          -3,180                  04/29/10   07/21/10    BROWNELL ELECTRIC CORP              
                                                            GC-002              0                  08/27/08   10/07/08    GALLO CONSTRUCTION CORP.            
                                                            GC-003              0                  09/25/08   01/27/09    GALLO CONSTRUCTION CORP.            
                                                            GC-004              0                  09/25/08   01/27/09    GALLO CONSTRUCTION CORP.            
                                                            GC-006              0                  09/25/08   01/27/09    GALLO CONSTRUCTION CORP.            
                                                            GC-008         17,095                  09/25/08   01/27/09    GALLO CONSTRUCTION CORP.            
                                                            GC-011          2,292                  12/03/08   04/03/09    GALLO CONSTRUCTION CORP.            
                                                            GC-014         -8,000                  08/24/11   09/09/11    GALLO CONSTRUCTION CORP             
                                                            M-001               0                  05/07/09   07/30/09    T. LEMME MECHANCIAL, INC.           
                                                            M-002               0                  04/29/10   07/21/10    T LEMME MECHANICAL INC              
                                                            M-003          -8,610                  04/29/10   07/21/10    T LEMME MECHANICAL INC              
                                                            P-005         -26,770                  06/26/09   08/13/09    MAZONE PLUMBING                     
                                                            P-4                 0                  03/12/09   06/25/09    MAZONE PLUMBING                     
 
11-0517   Reconstruction               0-002-018  01/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1585   Reconstruction               0-002-019  06/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  12/23/14   01/12/15    Classic Environmental, Inc.         
                                                            GC-001        -13,525                  12/23/14   01/12/15    Classic Environmental, Inc.         
                                                            GC-002              0                  12/23/14   01/12/15    Classic Environmental, Inc.         
                                                            GC-003              0                  12/23/14   01/07/15    Classic Environmental, Inc.         
                                                            PC-001              0                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-001         28,518                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-002              0                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-002         -3,356                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-003              0                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-003          6,548                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-004              0                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-004          1,160                  12/23/14   01/12/15    Collett Mechanical, Inc.            
                                                            PC-005              0                  12/23/14   01/13/15    Collett MEchanical, Inc.            
                                                            PC-006              0                  12/23/14   01/13/15    Collett Mechanical, Inc.            
 
15-0407   Additions and Alterations    0-002-020  08/26/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ECCO-05         9,606                  01/09/19   02/04/19    J.MCBAIN, INC.                      
                                                            ECCO-1         22,865                  01/09/19   02/13/19    J.MCBAIN, INC.                      
                                                            ECCO-10        14,191                  01/09/19   02/12/19    J.MCBAIN, INC.                      
                                                            ECCO-11         2,468                  01/09/19   02/01/19    J.MCBAIN, INC.                      
                                                            ECCO-12           272                  01/09/19   02/01/19    J.MCBAIN, INC.                      
                                                            ECCO-13         6,826                  01/09/19   02/04/19    J.MCBAIN, INC.                      
                                                            ECCO-14           591                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-15         1,099                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-16         2,825                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-17           538                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-18         8,017                  01/09/19   02/04/19    J.MCBAIN, INC.                      
                                                            ECCO-19         3,982                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-2          8,767                  01/09/19   02/04/19    J.MCBAIN, INC.                      
                                                            ECCO-20         1,454                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-21         2,429                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-22         1,109                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-23         4,024                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-24         3,126                  04/19/19   04/19/19    J. MCBAIN, INC.                     
                                                            ECCO-25         4,580                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-26         3,211                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-27       -26,890                  04/12/19   04/15/19    J. MCBAIN INC.                      
                                                            ECCO-3          9,693                  01/09/19   02/04/19    J.MCBAIN, INC.                      
                                                            ECCO-4          9,099                  01/09/19   02/04/19    J.MCBAIN, INC.                      
                                                            ECCO-6          4,675                  01/09/19   02/01/19    J.MCBAIN, INC.                      
                                                            ECCO-7          3,755                  01/09/19   02/01/19    J.MCBAIN, INC.                      
                                                            ECCO-9          2,638                  01/09/19   02/01/19    J.MCBAIN, INC.                      
                                                            GCCO 51         7,241                  05/14/19   05/15/19    BCI CONSTRUCTION, INC.              
                                                            GCCO-09        41,265                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-1         88,800                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-10        33,294                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-11        22,500                  01/09/19   02/04/19    BCI CONSTRUCTION INC.               
                                                            GCCO-12         4,608                  01/09/19   02/04/19    BCI CONSTRUCTION INC.               
                                                            GCCO-13         7,000                  01/09/19   02/04/19    BCI CONSTRUCTION INC.               
                                                            GCCO-14        16,074                  01/09/19   02/04/19    BCI CONSTRUCTION INC                
                                                            GCCO-15        26,889                  01/09/19   02/04/19    BCI CONSTRUCTION INC                
                                                            GCCO-16        16,333                  01/09/19   02/04/19    BCI CONSTRUCTION INC.               
                                                            GCCO-17         2,840                  01/09/19   02/04/19    BCI CONSTRUCTION INC.               
                                                            GCCO-18         6,331                  01/09/19   02/04/19    BCI CONSTRUCTION INC.               
                                                            GCCO-19         2,782                  01/09/19   02/04/19    BCI CONSTRUCTION INC.               
                                                            GCCO-2         15,953                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-20         4,571                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-21         2,096                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-22         8,038                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-23         3,635                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-25         1,654                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-27        10,398                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-28         4,614                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-29         3,500                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-3         80,466                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-30         1,059                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-31         1,421                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-32        14,640                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-33         2,525                  04/12/19   04/15/19    BCI CONSTRUCCTION INC.              
                                                            GCCO-34         2,745                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-35        -8,980                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-36         1,988                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-37         1,350                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-38        32,323                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-39         7,859                  04/19/19   04/24/19    BCI CONSTRUCTION, INC.              
                                                            GCCO-4          2,481                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-40        17,180                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-41         2,743                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-42         2,306                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-43         6,141                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-44         6,067                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-45        13,228                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-46           572                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-47         4,212                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-48         2,958                  04/12/19   04/15/19    BCI CONSTRUCTION INC.               
                                                            GCCO-49        -3,923                  04/19/19   04/24/19    BCI CONSTRUCTION, INC.              
                                                            GCCO-5         16,947                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-50       -10,000                  04/19/19   04/24/19    BCI CONSTRUCTION INC.               
                                                            GCCO-6          3,500                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-7         27,206                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            GCCO-8         24,021                  01/09/19   02/05/19    BCI CONSTRUCTION INC.               
                                                            MCCO-01       -33,677                  04/19/19   04/19/19    T. MCELLIGOTT,INC.                  
                                                            PCCO-01       -18,047                  04/19/19   04/19/19    CRISAFULLI BROS PLUMBING & HEATING  
                                                            SCCO-05           783                  04/19/19   04/19/19    ADIRONDACK CABLING & SECURITY       
                                                            SCCO-06          -612                  04/19/19   04/19/19    ADIRONDACK CABLING & SECURITY       
                                                            SCCO-07         2,580                  05/14/19   05/15/19    ADIRONDACK CABLING AND SECURITY     
                                                            SCCO-1          7,275                  01/09/19   02/04/19    ADIRONDACK CABLING AND SECURITY     
                                                            SCCO-4          3,697                  01/09/19   02/01/19    ADIRONDACK CABLING AND SECURITY     
 
16-1686   Reconstruction               0-002-021  05/04/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0696   Reconstruction               0-002-022  06/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           9,733                  06/26/20   08/03/20    HAROLD R. CLUNE, INC.               
                                                            EC-02           3,050                  06/26/20   08/03/20    HAROLD R. CLUNE, INC.               
                                                            EC-03          -2,120                  06/26/20   08/03/20    HAROLD R. CLUNE, INC.               
 
21-1039   Reconstruction               0-002-023  03/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0654   Reconstruction               0-002-025  12/01/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -5,000                  07/10/23     /  /      FORTH SPORT FLOOR                   
 
22-1704   Reconstruction               0-002-026  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1307   Reconstruction               0-002-027  05/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0121   Reconstruction               0-002-028  08/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1591FP Reconstruction               0-002-FP1  04/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School-NoAidBldgSee15-0407Add:
90-0839   Additions and Alterations    0-004-004  03/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0526   Additions and Alterations    0-004-006  01/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1336   Reconstruction               0-004-007  05/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0784   Reconstruction               0-004-008  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0874SR Reconstruction               0-004-010  04/18/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0662   Reconstruction               0-004-010  12/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,000                  10/01/07   12/13/07    DELSIGNORE BLACKTOP P               
                                                            4                   0                  12/03/08   02/10/09    BROWNELL ELECTRIC CORP.             
                                                            E-001               0                  10/02/08   05/14/09    BROWNLIE ELECTRIC CORP              
                                                            E-002               0                  10/02/08   05/14/09    BROWNLIE ELECTRIC CORP              
                                                            E-005               0                  12/03/08   02/10/09    BROWNELL ELECTRIC CORP.             
                                                            E-007               0                  03/16/09   06/23/09    BROWNELL ELECTRIC CORP.             
                                                            E-009         -23,767                  03/16/09   06/24/09    BROWNELL ELECTRIC CORP.             
                                                            E-013               0                  08/27/09   09/18/09    BROWNELL ELECTRIC CORP              
                                                            GC-005              0                  09/25/08   01/27/09    GALLO CONSTRUCTION CORP.            
                                                            GC-010            238                  12/03/08   04/03/09    GALLO CONSTRUCTION CORP.            
                                                            GC-012          4,062                  08/27/09   09/16/09    GALLO CONSTRUCTION CORP             
                                                            GC-013         10,424                  09/16/09     /  /      GALLO CONSTRUCTION CORP             
                                                            GC-014         -8,000                  08/24/11   09/23/11    GALLO CONSTRUCTION CORP             
                                                            M-002               0                  08/17/10   09/10/10    T. LEMME MECHANICAL INC             
                                                            P-003               0                  09/04/08   04/23/09    MAZONE PLUMBING                     
                                                            P-005         -26,770                  06/26/09   08/13/09    MAZONE PLUMBING                     
                                                            P-1                 0                  08/27/08   08/31/12    Mazone Plumbing                     
 
11-0518   Reconstruction               0-004-011  01/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1442   Reconstruction               0-004-012  07/03/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -28,796                  02/26/13   05/13/13    ROSCH BROTHERS INC                  
 
13-1586   Reconstruction               0-004-013  06/26/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-001              0                  12/23/14   01/07/15    Henderson Johnson Co., Inc.         
                                                            RC-001        -18,215                  12/23/14   01/07/15    Henderson Johnson Co., Inc.         
 
20-0871   Reconstruction               0-004-015  02/11/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01               -925                  03/31/22   02/09/23    Kipper Plumbing&Heat                
                                                            01               -925                  05/05/22     /  /      Kipper Plumb&Heat                   
                                                            02            -10,000                  03/31/22   02/09/23    Kipper Plumb&Heat                   
                                                            02            -10,000                  05/05/22     /  /      Kipper Plumb&Heat                   
 
22-1705   Reconstruction               0-004-016  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1308   Reconstruction               0-004-017  05/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1874FP Reconstruction               0-004-FP1  04/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXCES Modular Village removed 5/09:
06-0875   New Construction             0-011-001  04/18/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,500                  09/06/07   12/13/07    WILLIAMS SCOTSMAN, INC.             
                                                            002            16,000                  05/29/08   08/07/08    WILLIAMS SCOTSMAN, INC.             
                                                            3              -5,007                  05/29/08   08/07/08    WILLIAMS SCOTSMAN, INC.             
 

          Soccer Shed:
18-0843   New Construction             2-015-001  01/02/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-0470   Reconstruction               5-005-001  12/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1184   Reconstruction               5-005-002  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0527   Reconstruction               5-005-003  01/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1337   Reconstruction               5-005-004  05/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1349   Reconstruction               5-005-005  05/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0663   Reconstruction               5-005-007  12/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  08/27/08   10/07/08    GALLO CONSTRUCTION CORP.            
                                                            E-006               0                  03/16/09   05/27/09    BROWNELL ELECTRIC CORP.             
                                                            E-011               0                  08/27/09   09/16/09    BROWNELL ELECTRIC CORP              
                                                            GC-007         10,229                  09/12/08   11/06/08    GALLO CONSTRUCTION CORP.            
                                                            GC-009          1,140                  12/03/08   04/03/09    GALLO CONSTRUCTION CORP.            
                                                            GC-1           -1,063                  11/16/10   11/22/10    DELSIGNORE BLACKTOP PAVING INC      
                                                            GC-14          -4,000                  08/24/11   09/23/11    GALLO CONSTRUCTION CORP             
                                                            GC-2          -20,000                  11/16/10   11/22/10    DELSIGNORE BLACKTOP PAVING INC      
                                                            GC-3            1,769                  11/16/10   11/22/10    DELSIGNORE BLACKTOP PAVING INC      
                                                            P-002               0                  08/27/08   05/27/09    Mazone Plumbing                     
                                                            P-005         -26,770                  06/26/09   08/13/09    MAZONE PLUMBING                     
 
11-0519   Reconstruction               5-005-008  01/23/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0665   Reconstruction               5-005-009  05/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ECCO-01          -388                  05/14/19   05/15/19    BRUNSWICK ELECTRIC, INC.            
                                                            GCCO-01        -1,775                  05/14/19   05/17/19    UW MARX, INC.                       
                                                            GCCO-02       -12,598                  05/14/19   05/17/19    UW MARX, INC.                       
                                                            MCCO-01        -5,000                  05/14/19   05/15/19    T. MCELLIGOTT, INC.                 
 
21-1040   Reconstruction               5-005-010  02/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -5,000                  04/03/23   12/21/23    GALLO CONSTRUCTION CORP             
 
22-1706   Reconstruction               5-005-011  05/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
92-0022   Reconstruction               7-999-001  07/22/92  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0232   Reconstruction               7-999-002  05/15/06  NO CHANGE ORDERS ON ELECTRONIC FILE

TROY CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-17-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXPublic School #1 (sold 7/12/2016):
94-1245   Reconstruction               0-001-001  06/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1014   Reconstruction               0-001-002  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0696   Reconstruction               0-001-004  05/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            09               -401                  07/08/03   07/24/03    Bunkoff General Contractors         
                                                            ACCO-06        -4,392                  10/16/03   10/23/03    Jupiter Environ.                    
                                                            PCCO-01          -440                  04/01/02   05/23/02    Crisafulli Bros.                    
 
07-2107   Reconstruction               0-001-005  01/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-001           2,936                  07/19/10   09/03/10    KASSELMAN ELECTRIC CO INC           
                                                            2-016           8,266                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
 

          Public School #2:
90-1091   Reconstruction               0-002-002  03/21/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1246   Reconstruction               0-002-003  06/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1015   Reconstruction               0-002-004  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0685   Reconstruction               0-002-005  03/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0693   Reconstruction               0-002-006  05/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02              1,255                  09/18/03   11/26/03    Kasselman Elec.                     
                                                            03             -1,100                  07/08/03   07/24/03    Bunkoff General Contractors         
                                                            04               -500                  07/08/03   07/24/03    Bunkoff                             
                                                            07             -1,900                  07/08/03   07/24/03    Crisafulli Bros.                    
                                                            08             20,700                  07/08/03   07/24/03    Bunkoff                             
                                                            10              8,012                  07/08/03   07/24/03    Bunkoff                             
                                                            10              1,150                  07/08/03   07/24/03    Bunkoff                             
                                                            11             -3,917                  07/08/03   07/24/03    Bunkoff                             
                                                            12              2,847                  07/08/03   07/24/03    Bunkoff                             
                                                            13            -11,925                  07/08/03   07/24/03    Bunkoff                             
                                                            13                871                  07/08/03   07/24/03    Bunkoff                             
                                                            14               -532                  07/08/03   07/24/03    Bunkoff                             
                                                            14             -1,180                  07/08/03   07/24/03    Bunkoff                             
                                                            17               -112                  07/08/03   07/24/03    Bunkoff                             
                                                            1CC0-05        -9,490                  04/26/02   05/30/02    Bunkoff                             
                                                            1CC0-06         3,736                  06/17/02   08/15/02    Bunkoff                             
                                                            1CCO-03        -9,134                  04/05/02   05/24/02    Bunkoff                             
                                                            1DC0-05         2,004                  04/26/02   05/30/02    Bunkoff                             
                                                            1DC0-06           437                  04/26/02   05/30/02    Bunkoff                             
                                                            1DCO-01        -5,000                  03/07/02   04/04/02    Bunkoff                             
                                                            1DCO-04         2,525                  04/09/02   05/28/02    Bunkoff                             
                                                            ECCO-01       -15,422                  07/12/02   11/04/02    Kasselman Elec.                     
                                                            GC1A-1          8,038                  07/08/03   07/24/03    Bob Talham                          
                                                            MCCO-01       -37,601                  04/16/04   04/26/04    T Lemme Mech.                       
                                                            PCCO-02        -3,080                  04/01/02   05/23/02    Crisafulli Bros.                    
                                                            PCCO-09        -4,506                  09/18/03   12/17/03    Crisafulli Bros.                    
                                                            SCH 2          53,759                  07/08/03   07/24/03    Jupiter Environ.                    
 
07-2108   Reconstruction               0-002-007  01/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-012          18,087                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
 
16-1303   Reconstruction               0-002-008  11/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-01         -1,740                  06/15/20   07/17/20    HAROLD R. CLUNE, INC.               
                                                            GC1-01        -75,634                  02/03/20   02/26/20    DUNCAN & CAHILL, INC.               
                                                            GC1-02              0                  02/03/20   02/26/20    DUNCAN & CAHILL, INC.               
                                                            GC4-01         -4,417                  02/11/19   02/27/19    HOOSICK VALLEY CONTRACTORS,INC.     
                                                            MC-03           5,494                  12/13/19   01/21/20    T. MCELLIGOTT, INC.                 
 
16-0473   Reconstruction               0-002-009  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC2-01        -18,439                  09/18/17   10/13/17    Titan Roofing Inc.                  
                                                            GC2-02        -33,408                  03/26/18   03/28/18    Titan Roofing Inc.                  
                                                            GC4-01         31,000                  07/24/17   07/27/17    Hoosick Valley Contractors, Inc.    
                                                            GC4-02          5,216                  01/08/18   02/05/18    Hoosick Valley Contractors, Inc.    
 
17-1297   Reconstruction               0-002-010  03/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC01             -377                  02/23/23   12/18/23    ENVIRONMENTAL REMEDIATION SERVICES  
                                                            AC05           -3,600                  02/23/23   12/04/23    ENVIRONMENTAL REMEDIATION SERVICES  
                                                            AC06          -14,500                  02/23/23   12/18/23    ENVIRONMENTAL REMEDIATION SERVICES  
                                                            EC-003           -306                  02/08/23   11/29/23    DLC ELECTRIC LLC                    
                                                            EC-005           -734                  02/08/23   11/29/23    DLC ELEC LLC                        
                                                            EC-006          1,043                  02/08/23   11/29/23    DLC ELEC LLC                        
                                                            EC-007            300                  02/08/23   11/29/23    DLC ELEC LLC                        
                                                            EC-008           -377                  02/08/23   11/29/23    DLC ELEC LLC                        
                                                            GC-002         -7,998                  02/08/23   12/18/23    GALLO CONST CORP                    
                                                            GC-003        -26,500                  02/08/23   12/18/23    GALLO CONST CORP                    
                                                            GC-005         26,113                  02/08/23   12/18/23    GALLO CONST CORP                    
                                                            GC-014           -588                  11/02/20   01/26/21    GALLO CONSTRUCTION CORP.            
                                                            MC-001A       -20,000                  02/08/23     /  /      T MCELLIGOTT INC                    
                                                            PC-004           -151                  02/08/23   11/29/23    TRI VALLEY PLUMB&HEATING            
                                                            PC-005         -2,601                  02/08/23   11/29/23    TRI VALLEY PLUMB&HEAT               
 
19-1585   Reconstruction               0-002-011  04/10/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02               0                  03/16/21   06/18/21    DUNCAN & CAHILL, INC.               
                                                            GC-03          39,800                  03/16/21   06/18/21    DUNCAN & CAHILL, INC.               
 

          Public School #12:
94-1247   Reconstruction               0-005-003  06/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1184   Reconstruction               0-005-004  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1016   Reconstruction               0-005-005  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0686   Reconstruction               0-005-006  03/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0694   Reconstruction               0-005-007  05/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -2,009                  07/08/03   07/24/03    Bunkoff General Contractors         
                                                            01             85,431                  07/08/03   07/24/03    Jupiter Environ.                    
                                                            02             -5,781                  07/08/03   07/24/03    Crisafulli Bros.                    
                                                            03              1,475                  09/18/03   11/26/03    Kasselman Elec.                     
                                                            05            -10,000                  07/08/03   07/24/03    Bunkoff                             
                                                            06               -182                  07/08/03   07/24/03    Bunkoff                             
                                                            06             -1,900                  07/08/03   07/24/03    Crisafulli Bros.                    
                                                            07             43,564                  07/08/03   07/24/03    Bunkoff                             
                                                            09              1,111                  07/08/03   07/24/03    Bunkoff                             
                                                            10               -214                  07/08/03   07/24/03    Bunkoff                             
                                                            11              3,450                  07/08/03   07/24/03    Bunkoff                             
                                                            14              1,549                  07/08/03   07/24/03    Bunkoff                             
                                                            15             -1,180                  07/08/03   07/24/03    Bunkoff                             
                                                            17             -3,200                  07/08/03   07/24/03    Bunkoff                             
                                                            18             18,815                  07/08/03   07/24/03    Bunkoff                             
                                                            18               -424                  07/08/03   07/24/03    Bunkoff                             
                                                            19             -8,971                  07/08/03   07/24/03    Bunkoff                             
                                                            1BC0-05        -8,527                  04/26/02   05/30/02    Bunkoff                             
                                                            1BCO-01        -2,888                  04/05/02   05/24/02    Bunkoff                             
                                                            1BCO-03        -5,605                  04/09/02   05/28/02    Bunkoff                             
                                                            1BCo-11       -15,206                  07/08/03   07/24/03    Bunkoff                             
                                                            1DCO-02       -14,755                  03/07/02   04/04/02    Bunkoff                             
                                                            1DCO-07           896                  04/26/02   05/30/02    Bunkoff                             
                                                            1ECO-02        -1,332                  01/12/07   02/12/07    A.J. Arpet, Inc.                    
                                                            1FCO-02       -38,550                  01/12/07   02/12/07    Bunkoff General Contractors, Inc.   
                                                            1HCO-01        20,091                  01/12/07   02/12/07    Crisafulli Brothers                 
                                                            20               -555                  07/08/03   07/24/03    Bunkoff                             
                                                            ACCO-05        -8,002                  10/16/03   10/23/03    Jupiter Environ.                    
                                                            ACO-02          6,200                  07/08/03   07/24/03    Bob Talham                          
                                                            MCCO-02       -22,665                  04/16/04   04/26/04    T Lemme Mech.                       
                                                            PCCO-03        -5,240                  04/01/02   05/23/02    Crisafulli Bros.                    
 
05-1009   Reconstruction               0-005-009  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-12          -5,030                  04/04/08   08/12/08    TITAN ROOFING, INC.                 
                                                            1              12,082                  02/20/07   03/09/07    Titan Roofing                       
 
07-2109   Reconstruction               0-005-010  01/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1304   Reconstruction               0-005-012  11/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC1-03          1,247                  02/19/20   06/09/20    DUNCAN & CAHILL, INC.               
 
16-0474   Reconstruction               0-005-013  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC1GC-01       -3,317                  10/16/17   10/31/17    S & L Roofing & Sheetmetal, Inc.    
                                                            GC1GC-02        9,708                  10/16/17   10/31/17    S & L Roofing & Sheetmetal, Inc.    
                                                            PC-01           1,050                  01/04/18   01/25/18    ECKERT MECHANICAL                   
                                                            PC-02           1,284                  01/08/18   01/26/18    Eckert Mechanical, LLC              
                                                            PC-03           2,048                  01/04/18   01/29/18    Eckert Mechanical, LLC              
 
20-0722   Reconstruction               0-005-014  03/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-03           7,289                  10/07/22   07/13/23    Stanley Security                    
                                                            EC-01          18,001                  03/07/23   12/12/23    DLC ELECTRIC LLC                    
                                                            EC-02          15,475                  12/02/22   06/01/23    DLC Elec LLC                        
                                                            GC-01          -3,000                  10/04/22   12/18/23    MLB Const Servs                     
                                                            GC-02          -1,050                  07/22/22   05/05/23    MLB Const Servs                     
                                                            GC-03         -10,272                  07/22/22   05/05/23    MLB Const Servs                     
                                                            GC-04          -6,683                  07/22/22   05/05/23    MLB Const Servs                     
                                                            GC-05           4,426                  01/26/23   12/28/23    MLB CONST SERVICES                  
                                                            GC-05           4,426                  04/05/23   12/15/23    MLB Construction Services           
                                                            GC-06           2,522                  03/07/23   12/18/23    MLB CONST SERVICES                  
                                                            MC-01         -35,361                  04/05/23   12/21/23    RMB Mechanical Inc                  
                                                            PC-01          -3,800                  04/05/23   12/21/23    RMB Mechanical Inc.                 
 
22-0142   Reconstruction               0-005-016  10/25/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXSchool-14 (Sold):
95-1017   Reconstruction               0-006-002  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0887   Reconstruction               0-006-003  04/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0860   Reconstruction               0-006-005  03/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001            6,794                  06/07/06     /  /      T McElligott                        
 
07-1691   Reconstruction               0-006-006  05/16/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-05           3,427                  10/15/09   11/12/09    ENERGY MANAGEMENT TECHNOLOGIES INC  
                                                            HC-06          -4,500                  05/26/10   08/05/10    ENERGY MANAGEMENT TECHNOLOGIES INC  
                                                            HC-1          -62,000                  03/03/09   08/05/09    ENERGY MANAGEMENT TECHNOLOGIES, INC.
                                                            HC-2           10,157                  06/09/09   08/07/09    ENERGY MANAGEMENT TECHNOLOGIES      
                                                            HC-3            1,104                  07/13/09   11/12/09    ENERGY MANAGEMENT TECHNOLOGIES INC  
 
07-2110   Reconstruction               0-006-007  01/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-001          67,945                  10/07/09   04/19/11    DUNCAN & CAHILL INC                 
                                                            2-002          18,937                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-011          11,250                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-018           7,646                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
                                                            2-021           9,178                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
 

          Public School #16:
90-1576   Reconstruction               0-008-003  06/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1185   Reconstruction               0-008-004  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1248   Reconstruction               0-008-005  06/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1018   Reconstruction               0-008-006  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0687   Reconstruction               0-008-007  03/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2111   Reconstruction               0-008-009  01/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1305   Reconstruction               0-008-011  11/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0475   Reconstruction               0-008-012  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC1-03         14,175                  02/22/18   03/07/18    S&L Roofing & Sheetmetal, Inc.      
                                                            GC1-04          2,201                  03/12/18   03/22/18    S&L Roofing & Sheetmetal, Inc.      
                                                            GC1-06          2,216                  04/20/18   05/02/18    S & L Roofing & Sheetmetal, Inc.    
                                                            GC6-01        -13,975                  08/11/17   08/15/17    DelSignore Blacktop Paving, Inc.    
                                                            GC6-02          2,600                  01/08/18   02/05/18    DelSignore Blacktop Paving, Inc.    
                                                            GC6-03          1,544                  01/08/18   02/05/18    DelSignore Blacktop Paving, Inc.    
 
22-1896   Additions and Alterations    0-008-013  06/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Public School #14 (New Elem Schl):
90-1288   New Construction             0-009-001  05/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
15-2024   Reconstruction               0-009-002  07/28/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          23,350                  02/17/17   03/08/19    DLC Electric, Inc.                  
                                                            EC-02          23,350                  03/01/19   10/07/19    DLC ELECTRIC LLC                    
                                                            EC-04           8,185                  05/17/17   03/07/19    DLC Electric, LLC                   
                                                            EC-04           8,185                  03/01/19   10/07/19    DLC ELECTRIC LLC                    
                                                            EC-05          12,188                  05/24/17   06/01/17    DLC Electric LLC                    
                                                            EC-06          -1,409                  07/24/17   07/27/17    DLC Electric LLC                    
                                                            EC-07          19,443                  03/12/18   03/20/18    DLC Electric LLC                    
                                                            GC-01          20,233                  01/20/17   03/08/19    Duncan & Cahill, Inc.               
                                                            GC-01          20,233                  03/01/19   08/12/19    DUNCAN & CAHILL, INC.               
                                                            GC-02           3,489                  05/08/17   06/06/17    Duncan & Cahill, Inc.               
                                                            GC-03          19,136                  05/08/17   06/06/17    Duncan & Cahill, Inc.               
                                                            GC-04          20,101                  05/08/17   06/06/17    Duncan & Cahill, Inc.               
                                                            GC-06          14,502                  04/10/18   04/18/18    Duncan & Cahill, Inc.               
                                                            GC-07          25,977                  04/06/18   04/18/18    Duncan & Cahill, Inc.               
 
16-0052   Reconstruction               0-009-003  07/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             835                  07/24/17   07/27/17    DLC Electric LLC                    
                                                            GC-01          -9,775                  03/27/17   03/30/17    Gallo Construction Corp.            
                                                            GC-02          -7,918                  07/24/17   07/27/17    Gallo Construction Corp.            
 
16-1306   Reconstruction               0-009-004  11/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC5-01          3,392                  05/29/19   06/07/19    GALLO CONSTRUCTION CORP.            
                                                            GC5-02          2,667                  05/29/19   06/07/19    GALLO CONSTRUCTION CORP.            
                                                            MC-01               0                  12/13/19   12/26/19    T.MCELLIGOTT, INC.                  
                                                            MC-02          28,707                  12/13/19   01/21/20    T. MCELLIGOTT, INC.                 
 
16-0476   Reconstruction               0-009-005  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC5-CO1        -4,209                  09/18/17   10/17/17    AKTOR Corp.                         
 
20-0723   Additions and Alterations    0-009-006  03/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            CC-02           7,954                  10/07/22   07/13/23    Stanley Security                    
                                                            EC-01          14,997                  05/10/22   03/13/23    DLC Elec LLC                        
                                                            EC-02          12,922                  05/10/22   03/13/23    DLC Elec LLC                        
                                                            EC-03          62,227                  05/10/22   03/13/23    DLC Elec LLC                        
                                                            GC-01          -5,224                  07/22/22   05/05/23    MLB Const Servs                     
                                                            GC-02          16,512                  10/04/22   12/15/23    MLB Const Servs                     
                                                            GC-03          22,876                  10/04/22   12/15/23    MLB Const Servs                     
                                                            GC-04          27,740                  10/04/22   12/15/23    MLB Const Servs                     
                                                            GC-05         -75,758                  12/02/22   12/14/23    MLB Const Servs                     
                                                            GC-06          13,103                  01/11/23   09/19/23    MLB CONST SERVICES                  
                                                            GC-06          13,103                  01/26/23   12/15/23    MLB CONST SERVICES                  
                                                            GC-07           8,451                  01/26/23   12/15/23    MLB CONST SERVICES                  
                                                            GC-08           6,915                  03/07/23   12/18/23    MLB CONST SERVICES                  
                                                            MC-01         -50,918                  04/05/23   12/21/23    FAMILY DANZ MECHANICAL              
                                                            PC-01          -5,360                  01/28/22   01/25/23    RMB Mech Inc                        
                                                            PC-02          14,221                  06/07/22     /  /      RMB Mech Inc                        
                                                            PC-03          13,986                  10/04/22   07/27/23    RMB Mech Inc                        
                                                            PC-04          32,873                  10/07/22   07/13/23    RMB Mech Inc                        
                                                            PC-05          14,145                  10/07/22   07/13/23    RMB Mech Inc                        
 
19-1769   Reconstruction               0-009-007  06/18/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-01          -5,000                  04/16/21   05/24/21    PCC CONTRACTING, INC.               
 

          Public School #18:
92-1186   Reconstruction               0-010-004  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1249   Reconstruction               0-010-005  06/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1019   Reconstruction               0-010-006  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0688   Reconstruction               0-010-007  03/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1010   Reconstruction               0-010-009  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-18          10,075                  04/04/08     /  /      TITAN ROOFING, INC.                 
                                                            1              18,882                  02/20/07   04/23/07    Titan Roofing                       
 
07-2112   Reconstruction               0-010-010  01/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0011   Reconstruction               0-010-011  01/30/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0085   Reconstruction               0-010-012  07/18/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1307   Reconstruction               0-010-013  11/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0477   Reconstruction               0-010-014  02/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0807   Additions and Alterations    0-010-015  03/29/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           3,064                  04/04/23   12/21/23    FLEX ELECTRIC LLC                   
                                                            GC-01          66,338                  01/26/23   12/21/23    BETTE & CRING LLC                   
                                                            GC-02          31,816                  01/26/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-03          18,874                  01/26/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-04          84,450                  01/26/23     /  /      BETTE & CRING LLC                   
                                                            GC-05          18,968                  01/26/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-06          32,174                  01/26/23   12/15/23    BETTE & CRING LLC                   
                                                            GC-07          28,556                  03/07/23   12/18/23    BETTE & CRING LLC                   
                                                            GC-08           3,760                  03/07/23   12/18/23    BETTE & CRING LLC                   
                                                            GC-09          11,720                  03/07/23   12/18/23    BETTE & CRING LLC                   
                                                            GC-10           8,569                  03/07/23   12/18/23    BETTE & CRING LLC                   
                                                            GC-11          13,041                  03/07/23   12/18/23    BETTE & CRING LLC                   
                                                            GC-12          27,728                  03/07/23   12/18/23    BETTE & CRING LLC                   
                                                            GC-13          31,272                  03/07/23   12/18/23    BETTE & CRING LLC                   
                                                            PC-01          20,583                  04/21/23   12/27/23    DIGESARE MECHANICAL                 
 
20-1854   Reconstruction               0-010-016  08/12/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Troy High School:
90-1209   Reconstruction               0-011-007  04/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1289   Reconstruction               0-011-008  05/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1885   Reconstruction               0-011-009  08/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1187   Reconstruction               0-011-010  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1250   Reconstruction               0-011-011  06/09/95  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00007           8,959                  03/05/08     /  /      WJV MECHANICAL                      
                                                            HVAC #5          -701                  03/18/08   04/21/08    WJV MECHANICAL                      
 
95-1020   Reconstruction               0-011-012  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0888   Reconstruction               0-011-013  04/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1167   Reconstruction               0-011-014  06/08/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3-01           -2,252                  02/11/02   03/22/02    Arcon Const.                        
                                                            CO-01         -36,770                  07/08/03   07/24/03    A.Leto and Son Paving               
                                                            GC-01            -517                  02/11/02   03/22/02    Sam Greco Const.                    
 
04-0861   Reconstruction               0-011-017  03/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001           4,918                  06/07/06   11/22/06    T MC Elligott                       
                                                            00001          16,349                  06/07/06   07/26/06    HMA Contracting                     
                                                            00002          10,665                  06/07/06     /  /      T Mcelligott                        
 
05-0557   Reconstruction               0-011-018  04/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001           3,505                  02/20/07   03/09/07    Frank Ryan and Sons                 
                                                            00001          21,003                  10/22/07   01/25/08    GROSS ELECTRIC                      
                                                            00001           1,414                  01/27/09   05/20/09    JJ CURRAN                           
                                                            00002           6,836                  02/12/07   03/12/07    WJV mechanical                      
                                                            00002           6,139                  10/22/07   01/25/08    GROSS ELECTRIC                      
                                                            00002          14,238                  03/05/08   08/07/08    Malone & Tate Builders              
                                                            00005          13,066                  03/05/08   08/05/08    WJV Mechanical                      
                                                            00006          10,840                  03/05/08   08/05/08    WJV Mechanical                      
                                                            4              17,359                  02/20/07   03/09/07    Malone And Tate Builders            
                                                            4              13,332                  02/20/07   03/09/07    WJV mechanical                      
                                                            GC2            21,842                  01/26/07   02/12/07    Malone & Tate Builders              
                                                            GC3            40,541                  01/26/07   02/12/07    Malone & Tate Builders              
 
05-1011   Reconstruction               0-011-019  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          -2,655                  08/16/10   09/28/10    LUPINI CONSTRUCTION INC             
 
06-0658   Additions and Alterations    0-011-020  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          82,930                  11/30/07   12/12/07    Malone & Tate Building              
                                                            00001          33,721                  12/11/07   08/26/11    Gross Electric                      
                                                            00001          33,661                  03/18/08   01/27/09    MERIT PLUMBING AND HEATING          
                                                            00002         -10,000                  03/05/08   03/19/08    Weatherguard Roofing Comp.          
                                                            00002           3,479                  10/06/08   02/26/09    MERIT PLUMBING ASND HEATING         
                                                            00002          14,238                  03/23/10   04/02/10    MALONE & TATE BUILDERS              
                                                            00006          25,653                  09/18/08   06/25/10    GROSS ELECTRIC                      
                                                            00007          18,640                  09/18/08   06/25/10    GROSS ELECTRIC                      
                                                            00008           9,282                  09/18/08   07/08/09    GROSS ELECTRIC                      
                                                            00008          22,762                  03/19/09   05/27/09    MALONE & TATE BUILDERS              
                                                            ABATE-01      -45,095                  03/18/08   04/01/08    BOJAN DEVELOPMENT                   
                                                            ABATE-02       40,002                  03/18/08   04/01/08    BOJAN DEVELOPMENT                   
                                                            ELECT-2        20,375                  03/18/08   09/16/11    GROSS ELECTRIC                      
                                                            ELECT-3        42,437                  03/18/08   09/16/11    GROSS ELECTRIC                      
                                                            ELECT-5         8,107                  03/18/08   08/10/10    GROSS ELECTRIC                      
                                                            ELEV-01        -1,142                  04/25/08   01/27/09    OTIS ELEVATOR COMPANY               
                                                            Ele - #4       19,593                  03/18/08   01/23/09    Gross Electric                      
                                                            GC-03          11,434                  04/25/08   08/05/08    MALONE & TATE BUILDERS              
                                                            GC-04          26,692                  04/25/08   08/05/08    MALONE & TATE BUILDERS              
                                                            GC-05          20,248                  04/25/08   08/05/08    MALONE & TATE BUILDERS              
                                                            GC-06          47,924                  04/25/08   08/05/08    MALONE & TATE BUILDERS              
                                                            GC-07          14,462                  04/25/08   08/05/08    MALONE & TATE BUILDERS              
                                                            GC-09          11,617                  03/19/09   05/27/09    MALONE & TATE BUILDERS              
                                                            HVAC #2        14,037                  10/06/08   04/14/09    T. MCELLIGOT, INC.                  
                                                            HVAC-1         30,276                  01/11/08   08/19/11    T.McElligott                        
                                                            PLUM-01        33,661                  03/18/08     /  /      MERIT PLUMBING AND HEATING          
 
07-0601   Reconstruction               0-011-021  04/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01          -3,447                  10/28/08   11/06/08    BROWNELL ELECTRIC CORP.             
                                                            GC-01          -2,250                  07/30/08   08/27/08    GRECO CONSTRUCTION, INC.            
                                                            GC-02          -3,000                  11/03/08   12/09/08    GRECO CONSTRUCTION                  
                                                            GC-03          -1,800                  11/03/08   12/09/08    GRECO CONSTRUCTION                  
 
07-2113   Reconstruction               0-011-022  01/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001          -3,900                  09/07/10   09/24/10    JUPITER ENVIRONMENTAL SERVICES      
                                                            1-001          48,282                  10/15/10   10/29/10    DUNCAN & CAHILL INC                 
                                                            2 - 001        -7,186                  10/19/12   08/09/13    Collett Mechanical, Inc.            
                                                            2-002            -841                  07/19/10   09/03/10    KASSELMAN ELECTRIC CO INC           
                                                            2-004          20,331                  01/26/10   09/20/11    DUNCAN & CAHILL INC                 
                                                            2-005          17,393                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-006          80,461                  01/26/10   09/04/12    DUNCAN & CAHILL INC                 
                                                            2-008          43,153                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-009          25,150                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-013          10,262                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-014          24,829                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-015          14,274                  01/26/10   03/18/10    DUNCAN & CAHILL INC.                
                                                            2-017           6,051                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
                                                            2-019          28,605                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
                                                            2-020         -10,274                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
                                                            2-023          -4,714                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
                                                            3-001          71,916                  01/27/11   03/01/11    DLC ELECTRIC LLC                    
                                                            4-001          -6,266                  09/07/10   09/28/10    COLLETT MECHANICAL INC              
                                                            4-001          -3,187                  09/13/11   08/23/12    ACKERMAN PLUMBING INC               
                                                            6-001          16,557                  12/23/09   02/05/10    MERIT PLUMBING & HEATING LLC        
                                                            6-003          36,099                  12/23/09   02/05/10    MERIT PLUMBING & HEATING LLC        
                                                            6-004          24,798                  12/23/09   02/05/10    MERIT PLUMBING & HEATING LLC        
                                                            6-005           5,417                  12/23/09   02/05/10    MERIT PLUMBING & HEATING LLC        
                                                            6-006            -267                  12/23/09   02/05/10    MERIT PLUMBING & HEATING LLC        
 
10-0582   Reconstruction               0-011-024  04/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-01          7,206                  09/13/11   10/14/11    NEOPLANTA RESTORATION INC           
                                                            ASB-02          3,553                  09/13/11   10/14/11    NEOPLANTA RESTORATION INC           
                                                            ASB-04              0                  05/25/12   10/05/12    NEOPLANTA RESTORATION INC           
                                                            EC-03               0                  05/25/12   09/28/12    J. MCBAIN INC                       
                                                            GC-01             236                  10/05/12   02/21/13    ZANDRI CONSTRUCTION CORP.           
                                                            GC-02               0                  05/25/12   10/05/12    ZANDRI CONSTRUCTION CORP            
                                                            GC-03           9,528                  10/05/12   02/15/13    ZANDRI CONSTRUCTION CORP            
                                                            GC-04             688                  01/16/13   04/05/13    ZANDRI CONSTRUCTION CORP            
                                                            GC-05           5,929                  01/16/13   04/05/13    ZANDRI CONSTRUCTION CORP            
                                                            GC-06           2,777                  01/16/13   04/05/13    ZANDRI CONSTRUCTION CORP            
                                                            GC-07             582                  01/16/13   04/05/13    ZANDRI CONSTRUCTION CORP            
                                                            GC-08            -236                  01/16/13   04/05/13    ZANDRI CONSTRUCTION CORP            
                                                            PL-01          -6,074                  01/26/12   04/17/12    MERIT PLUMBING & HEATING LLC        
                                                            PL-02               0                  05/25/12   09/28/12    MERIT PLUMBING & HEATING LLC        
                                                            SC-01               0                  05/25/12   10/05/12    CFI CONTRACTING INC                 
                                                            SC-01          -3,306                  10/28/13   12/06/13    M. Sullivan Construction, Inc.      
                                                            SC-02             418                  06/22/12   11/09/12    CFI Contracting, Inc.               
                                                            SC-02          18,659                  04/30/14   05/15/14    M. Sullivan Construction, Inc.      
                                                            SC-03         -55,640                  08/01/12   11/09/12    CFI Contracting, Inc.               
                                                            SC-03           4,508                  04/30/14   05/15/14    M. Sullivan Construction, Inc.      
                                                            SC-04           5,572                  02/06/13   11/22/13    CFI CONTRACTING INC                 
                                                            SC-04           5,447                  04/30/14   05/15/14    M. Sullivan Construction, Inc.      
                                                            SC-05          60,000                  04/25/13   07/12/13    CFI CONTRACTING INC                 
                                                            SC-05           2,000                  04/30/14   05/15/14    M. Sullivan Construction, Inc.      
 
15-2025   Reconstruction               0-011-026  07/28/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,152                  09/03/19   09/04/19    DLC Electric, Inc.                  
                                                            EC-03          31,887                  05/17/17   10/07/19    DLC Electric, LLC                   
                                                            GC-05           1,775                  04/20/17   06/05/17    Duncan & Cahill, Inc.               
 
16-1308   Reconstruction               0-011-027  11/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01         -13,318                  07/19/19   07/22/19    ENVIROMENTAL REMEDIATION SERVICES   
                                                            AA-02          14,509                  02/03/20   02/27/20    ENVIROMENTAL REMEDIATION SERVICES   
                                                            AA-03          10,625                  08/30/19   09/03/19    ENVIROMENTAL REMEDIATION SERVICES IN
                                                            AA-04           4,829                  12/30/19   01/10/20    ENVIROMENTAL REMEDIATION SERVICES   
                                                            AA-05           9,677                  12/30/19   01/10/20    ENVIROMENTAL REMEDIATION SERVICES   
                                                            AA-06          12,004                  12/30/19   01/10/20    ENVIROMENTAL REMEDIATION SERVICES   
                                                            AA-07          27,356                  12/30/19   01/10/20    ENVIROMENTAL REMEDIATION SERVICES   
                                                            AA-08          -9,300                  06/12/20   07/20/20    Environmental Remediation Services  
                                                            EC-01          19,857                  01/09/19   02/22/19    DLC ELECTRIC LLC                    
                                                            EC-04          16,819                  08/30/19   09/03/19    DLC ELECTRIC LLC                    
                                                            EC-05               0                  02/19/20   06/09/20    DLC ELECTRIC, LLC                   
                                                            EC-06          17,830                  06/12/20   07/20/20    DLC Electric                        
                                                            GC-3-12        27,243                  10/07/21   07/26/22    John Danforth Company               
                                                            GC3-02         27,498                  10/30/19   11/04/19    JOHN W. DANFORTH CO.                
                                                            GC3-03         17,177                  12/13/19   12/27/19    JOHN W. DANFORTH CO.                
                                                            GC3-04              0                  12/13/19   12/27/19    JOHN W. DANFORTH CO.                
                                                            GC3-05            491                  12/13/19   12/27/19    JOHN W. DANFORTH CO.                
                                                            GC3-06         13,830                  12/20/19   01/27/20    JOHN W. DANFORTH CO.                
                                                            GC3-07         -1,639                  12/20/19   01/27/20    JOHN W. DANFORTH CO.                
                                                            GC3-08         -5,522                  12/11/20   03/09/21    JOHN W. DANFORTH CO.                
                                                            GC3-09          2,431                  12/11/20   03/09/21    JOHN W. DANFORTH CO.                
                                                            GC3-10          1,002                  12/11/20   03/09/21    JOHN W. DANFORTH CO.                
                                                            GC3-11        -23,010                  02/19/21   04/08/21    JOHN W. DANFORTH CO.                
                                                            MC-01          39,962                  07/19/19   07/22/19    JOHN W. DANFORTH CO.                
                                                            MC-02          -8,670                  07/19/19   07/22/19    JOHN W. DANFORTH CO.                
                                                            MC-03           3,299                  07/19/19   07/22/19    JOHN W. DANFORTH CO.                
                                                            MC-04           9,429                  08/30/19   09/03/19    JOHN W. DANFORTH CO.                
                                                            MC-05          18,100                  10/30/19   11/01/19    JOHN W. DANFORTH CO.                
                                                            MC-06             937                  10/30/19   11/01/19    JOHN W. DANFORTH CO.                
                                                            MC-07           7,561                  11/13/19   11/21/19    JOHN W. DANFORTH CO.                
                                                            MC-08          15,073                  12/20/19   01/10/20    JOHN W. DANFORTH CO.                
                                                            MC-09          47,145                  12/20/19   01/10/20    JOHN W. DANFORTH CO.                
                                                            MC-10           8,493                  12/20/19   01/10/20    JOHN W. DANFORTH CO.                
                                                            MC-11           1,110                  02/03/20   02/27/20    JOHN W. DANFORTH CO.                
                                                            MC3-12          7,050                  12/11/20   02/25/21    JOHN W. DANFORTH CO.                
                                                            MC3-13          4,538                  02/19/21   04/09/21    JOHN W. DANFORTH CO.                
                                                            MC3-14         10,000                  02/19/21   04/09/21    JOHN W. DANFORTH CO.                
                                                            MC3-15         16,715                  02/19/21   04/05/21    JOHN W. DANFORTH CO.                
                                                            PC-01           3,792                  03/20/19   03/20/19    TRI-VALLEY PLUMBING& HEATING, INC   
                                                            PC-02         -20,373                  03/20/19   03/20/19    TRI-VALLEY PLUMBING & HEATING, INC  
                                                            PC-03             431                  05/29/19   05/30/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-04           1,080                  05/29/19   05/30/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-05           1,290                  05/29/19   05/30/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-06           1,926                  05/29/19   05/30/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-07         -26,010                  08/14/19   08/20/19    TRI-VALLEY PLUMBING & HEATING,INC.  
                                                            PC-09           7,871                  10/30/19   11/01/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-10           9,250                  10/30/19   11/01/19    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC-11          15,138                  12/20/19   01/10/20    TRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC3-12          7,228                  02/19/20   06/09/20    YRI-VALLEY PLUMBING & HEATING, INC. 
                                                            PC3-13              0                  06/15/20   07/17/20    TRI-VALLEY PLUMBING & HEATING,INC.  
                                                            PC3-14         11,960                  06/15/20   07/17/20    TEI-VALLEY PLUMBING & HEATING,INC.  
                                                            PC3-15          1,982                  06/15/20   07/17/20    TRI-VALLEY PLUMBING & HEATING,INC.  
 
16-0478   Reconstruction               0-011-028  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-02         -20,450                  04/06/18   04/12/18    AKTOR Corp.                         
                                                            AA1-01           -600                  02/01/18   02/21/18    AKTOR Corp.                         
                                                            GC1-05       -215,361                  03/12/18   03/22/18    S&L Roofing & Sheetmetal, Inc.      
                                                            GC5-CO2       -56,059                  04/24/18   05/03/18    AKTOR Corp.                         
 
17-0841   Reconstruction               0-011-029  12/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01            -997                  12/19/18   02/11/19    DUNCAN & CAHILL, INC.               
 
18-0719   Reconstruction               0-011-030  10/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -7,372                  02/13/19   03/18/19    GENERAL ROOFING CONTRACTORS LLC     
                                                            GC-02          -3,861                  02/13/19   03/18/19    GENERAL ROOFING CONTRACTORS LLC     
                                                            GC-03         -36,153                  07/19/19   07/25/19    GENERAL ROOFING CONTRACTORS LLC     
 
18-2017   Reconstruction               0-011-031  06/06/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          59,955                  12/30/19   01/17/20    GENERAL ROOFING CONTRACTORS LLC     
                                                            GC-02          37,498                  12/30/19   01/17/20    GENERAL ROOFING CONTRACTORS LLC     
                                                            GC-03          12,073                  06/12/20   08/07/20    General Roofing                     
                                                            GC-04         -10,031                  08/03/20   10/02/20    GENERAL ROOFING CONTRACTORS LLC     
                                                            GC-05            -720                  11/10/20   02/24/21    GENERAL ROOFING CONTRACTORS, LLC    
 
19-0389   Reconstruction               0-011-032  11/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,791                  08/03/20   09/22/20    SAM GRECO CONSTRUCTION, INC.        
                                                            GC-02               0                  01/19/21   06/15/21    SAM GRECO CONSTRUCTION, INC.        
                                                            GC-03           7,155                  01/19/21   06/15/21    SAM GRECO CONSTRUCTION, INC.        
 
19-1275   Reconstruction               0-011-033  05/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01            -501                  02/04/21   04/12/21    TITAN ROOFING, INC.                 
                                                            RC-02         -38,128                  03/16/21   05/13/21    TITAN ROOFING, INC.                 
                                                            RC-03          -8,404                  09/08/21   11/28/22    TITAN ROOFING INC                   
                                                            RC-04          33,902                  08/02/21   04/07/22    TITAN ROOFING INC                   
                                                            RC-05           3,804                  12/02/21   12/16/22    Titan Roofing Inc                   
 
21-1888   Reconstruction               0-011-035  07/06/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          20,000                  01/26/23   12/15/23    TITAN ROOFING                       
 
22-2491   Reconstruction               0-011-037  07/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Troy Middle Sch (frmly WK Doyle MS):
90-1393   Reconstruction               0-012-003  06/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1251   Reconstruction               0-012-004  06/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1021   Reconstruction               0-012-005  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0889   Reconstruction               0-012-006  04/03/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-10           -3,393                  02/28/02   04/17/02    Dupont Flooring Systems             
 
99-1687   Reconstruction               0-012-008  08/23/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ECCO-01       -10,000                  03/05/02   05/22/02    McCall Elec.                        
 
05-0348   Reconstruction               0-012-009  01/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           2,852                  11/21/06   01/09/07    T McElligott Mechanical             
                                                            00001           3,947                  11/21/06   01/09/07    Farina Electric                     
                                                            00002            -107                  11/21/06   01/09/07    T McElligott                        
 
00-1541   Reconstruction               0-012-010  04/11/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -10,000                  04/16/02   05/06/02    Gross Elec.                         
                                                            EC-02          -5,000                  07/08/03   07/16/03    Gross Elec.                         
 
05-0780   Reconstruction               0-012-011  04/05/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003           2,458                  02/20/07   03/14/07    WJV mechanical                      
                                                            00006          10,840                  12/28/09   05/13/10    WJV MECHANICAL                      
                                                            00007           8,960                  04/10/08   08/07/08    WJV Mechanical                      
                                                            00008            -701                  03/18/08     /  /      WJV MECHANICAL                      
                                                            WJV 1          70,571                  01/26/07   02/12/07    WJV Mechanical                      
 
07-1754   Reconstruction               0-012-012  06/03/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,288                  10/28/09   12/30/09    GANEM CONTRACTING CORP              
                                                            HC-01          -1,163                  03/03/09   06/02/09    STANTS COMBUSTION ASSOCIATES, INC.  
 
07-2114   Reconstruction               0-012-013  01/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-007          88,682                  01/26/10   09/04/12    DUNCAN & CAHILL INC                 
                                                            2-010          -2,050                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            6-002          49,668                  12/23/09   02/05/10    MERIT PLUMBING & HEATING LLC        
 
10-1056   Reconstruction               0-012-014  08/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AA-01          -2,300                  06/28/12   11/09/12    Danair, Inc.                        
                                                            AA-02          44,064                  06/28/12   11/09/12    Danair, Inc.                        
                                                            AA-03          11,509                  06/28/12   11/09/12    Danair, Inc.                        
                                                            AA-04               0                  05/25/12   10/05/12    DANAIR INC                          
                                                            AA-05           2,970                  07/23/12   02/19/13    DANAIR INC                          
                                                            AA-06           3,480                  07/23/12   02/19/13    DANAIR INC                          
                                                            AA-07           8,879                  07/23/12   02/19/13    DANAIR INC                          
                                                            AA-08           7,640                  07/23/12   02/19/13    DANAIR INC                          
                                                            AA-09           1,116                  07/23/12   02/19/13    DANAIR INC                          
                                                            AA-10          12,531                  07/23/12   02/19/13    DANAIR INC                          
                                                            AA-10          12,531                  01/14/13   05/31/13    DANAIR INC                          
                                                            AA-11           1,569                  07/23/12   02/19/13    DANAIR INC                          
                                                            AA-12          26,107                  12/28/12   03/06/13    Danair, Inc.                        
                                                            AA-13             294                  01/16/13   04/05/13    DANAIR INC                          
                                                            AA-14           1,962                  01/16/13   04/05/13    DANAIR INC                          
                                                            AA-15           7,133                  02/21/14   03/10/14    DANAIR Inc.                         
                                                            AA-16q              0                  04/07/14   04/21/14    Danair, Inc.                        
                                                            EC-01               0                  05/25/12   10/18/13    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-02          -2,894                  01/14/13   02/21/14    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-03          -4,455                  01/14/13   02/21/14    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-04            -854                  02/06/13   02/14/14    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-05            -796                  06/10/13   02/21/14    Schenectady Hardware & Electric     
                                                            EC-06           5,588                  07/25/13   06/06/14    Schenectady Hardware & Electric     
                                                            EC-07             888                  10/08/13   06/06/14    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-08           7,622                  10/08/13   06/06/14    SCHENECTADY HARDWARE & ELECTRIC     
                                                            EC-09           5,043                  09/17/13   06/06/14    Schenectady Hardware & Electric     
                                                            EC-10             133                  09/17/13   06/06/14    Schenectady Hardware & Electric     
                                                            EC-11          17,561                  02/21/14   03/10/14    Schenectady Hardware & Electric     
                                                            EC-12          14,411                  02/21/14   03/10/14    Schenectady Hardware & Electric     
                                                            EC-13          14,373                  02/21/14   03/21/14    Schenectady Hardware & Electric     
                                                            EC-14           2,684                  03/11/14   05/30/14    Schenectady Hardware & Electric     
                                                            EC-15             343                  03/11/14   05/30/14    Schenectady Hardware & Electric     
                                                            EC-16           1,457                  04/30/14   05/15/14    Schenectady Hardware & Electric     
                                                            EC-17             -90                  04/30/14   05/15/14    Schenectady Hardware & Electric     
                                                            EC-18           8,667                  04/30/14   05/15/14    Schenectady Hardware & Electric     
                                                            GC - 04       -21,726                  11/13/12   02/22/13    Sano - Rubin Construction Co., Inc. 
                                                            GC-01         -94,000                  01/26/12   04/27/12    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-02               0                  05/25/12   10/05/12    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-03          20,643                  10/05/12   02/15/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-05         -13,094                  04/15/13   04/16/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-06          19,236                  02/06/13   06/14/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-07          23,757                  02/06/13   06/14/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-08          24,465                  02/06/13   06/14/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-09          23,833                  02/06/13   06/14/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-10          34,978                  02/06/13   06/14/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-11          24,005                  02/11/13   06/06/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-12          18,771                  02/11/13   06/06/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-13          39,533                  02/11/13   06/06/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-14           6,873                  03/01/13   05/13/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-15          28,871                  03/01/13   05/13/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-16          -7,900                  03/18/13   06/06/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-17          -1,533                  03/18/13   06/06/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-18          12,108                  03/18/13   06/06/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-19          13,365                  03/18/13   06/06/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-20           7,405                  04/17/13   11/22/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-21          32,694                  04/25/13   07/12/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-22             711                  05/03/13   06/28/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-23           1,166                  05/03/13   11/22/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-24          67,350                  05/03/13   11/22/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-25          32,583                  05/09/13   11/22/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-26          11,338                  05/09/13   11/22/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-27          17,378                  05/31/13   07/12/13    Sano Rubin Construction Co., Inc.   
                                                            GC-28          17,787                  05/31/13   07/12/13    Sano Rubin Construction Co., Inc.   
                                                            GC-29         -20,643                  06/20/13   07/12/13    Sano Rubin Construction Co., Inc.   
                                                            GC-30          68,527                  05/24/13   07/19/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-31           4,682                  06/20/13   07/12/13    Sano - Rubin Construction Co., Inc. 
                                                            GC-32          34,668                  07/18/13   07/29/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-33          55,129                  07/18/13   07/29/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-34          10,745                  07/18/13   08/09/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-35          47,779                  07/18/13   07/29/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-36          15,338                  08/02/13   08/09/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-37          18,727                  08/02/13   08/09/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-38          23,456                  08/02/13   08/09/13    Sano-Rubin Construction Co., Inc.   
                                                            GC-39          24,758                  08/02/13   08/09/13    Sano-Rubin Constructoin Co., Inc.   
                                                            GC-40          28,441                  10/08/13   11/01/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-41          19,419                  10/08/13   11/01/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-42          23,612                  10/08/13   11/01/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-43          -2,647                  10/08/13   11/01/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-44          -1,350                  10/08/13   11/01/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-45           1,659                  10/08/13   11/08/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-46          60,235                  10/08/13   11/08/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-47           3,659                  10/08/13   11/08/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-48          14,010                  10/08/13   11/08/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-49          20,791                  10/08/13   11/01/13    SANO-RUBIN CONSTRUCTION CO INC      
                                                            GC-50          11,323                  12/13/13   06/05/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-51          25,475                  12/13/13   06/05/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-52          19,997                  12/13/13   06/05/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-53          57,960                  12/13/13   06/05/14    Sano-Rubin Construction, Co., Inc.  
                                                            GC-54           3,508                  02/21/14   03/10/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-55          -2,992                  03/21/14   06/05/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-56          12,600                  04/30/14   05/15/14    Sano-Rubin Constructuion Co., Inc.  
                                                            GC-57          27,488                  04/30/14   05/15/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-58          22,512                  04/30/14   05/15/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-59          40,000                  04/30/14   05/15/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-60          70,000                  04/30/14   05/15/14    Sano-Rubin Construction Co., Inc.   
                                                            GC-61            -962                  04/30/14   05/15/14    Sano-Rubin Construction Co., Inc.   
                                                            HC-01               0                  05/25/12   10/18/13    DIGESARE MECHANICAL INC             
                                                            HC-02          48,288                  08/12/13   06/25/14    DiGesare Mechanical, Inc.           
                                                            HC-03            -457                  10/08/13   06/06/14    DIGESARE MECHANICAL INC             
                                                            HC-04         -62,850                  04/30/14   05/15/14    DiGesare Mechanical, Inc.           
                                                            PC-01               0                  05/25/12   10/18/13    MAZONE PLUMBING AND HEATING INC     
                                                            PC-02          -1,249                  10/05/12   12/31/13    MAZONE PLUMBING AND HEATING INC     
                                                            PC-03           9,831                  02/06/13   02/14/14    MAZONE PLUMBING AND HEATING INC     
                                                            PC-04           7,981                  03/06/13   02/21/14    MAZONE PLUMBING AND HEATING INC     
                                                            PC-05           1,598                  05/08/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-06          14,216             330  05/15/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-07             309                  05/31/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-08           1,057                  06/20/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-09             641                  07/19/13   06/05/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-10           1,016                  07/19/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-11          48,367                  07/19/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-12          32,813                  07/19/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-13          10,076                  07/19/13   02/21/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-14           6,603                  07/25/13   06/06/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-15          12,784                  10/08/13   06/06/14    MAZONE PLUMBING & HEATING INC       
                                                            PC-16           3,954                  01/06/14   06/06/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-17          10,965                  01/06/14   01/31/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-18          25,542                  01/06/14   01/31/14    Mazone Plumbing & Heating, Inc.     
                                                            PC-19           4,163                  02/21/14   03/10/14    Mazone Plumbing and Heating Inc.    
                                                            PC-20            -315                  03/11/14   05/30/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-21             779                  03/11/14   05/30/14    Mazone Plumbing and Heating, Inc.   
                                                            PC-22           2,408                  04/30/14   05/16/14    Mazone Plumbing and Heating, Inc.   
                                                            TC-01          -5,290                  10/05/12   02/15/13    BARBER MARKETING INC                
                                                            TC-02               0                  05/25/12   10/05/12    BARBER MARKETING INC                
                                                            TC3            -5,673                  04/30/14   05/15/14    Barber Marketing, Inc.              
 
13-1427   Reconstruction               0-012-015  08/20/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1309   Reconstruction               0-012-016  11/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           1,008                  01/09/19   02/12/19    DLC ELECTRIC LLC                    
                                                            EC-03           1,688                  08/30/19   09/03/19    DLC ELECTRIC LLC                    
                                                            GC3-01          2,233                  10/30/19   11/04/19    JOHN W. DANFORTH CO.                
                                                            PC-08           2,287                  08/14/19   08/20/19    TRI-VALLEY PLUMBING & HEATING,INC.  
 
16-1139   Reconstruction               0-012-017  01/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01           5,618                  01/04/18   01/25/18    T. MCELLIGOTT INC.                  
 
03-0188FP Reconstruction               0-012-FP1  10/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Carroll Hill School:
92-1535   Reconstruction               0-016-002  08/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1022   Reconstruction               0-016-003  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0426   Reconstruction               0-016-004  11/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0890   Reconstruction               0-016-005  04/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0695   Reconstruction               0-016-006  05/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03             19,089                  07/08/03   07/24/03    Jupiter Environ.                    
                                                            04              1,644                  09/18/03   11/26/03    Kasselman Elec.                     
                                                            08             17,250                  07/08/03   07/24/03    Bunkoff General Contractors         
                                                            08             -1,624                  07/08/03   07/24/03    Crisafulli Bros.                    
                                                            10               -218                  09/18/03   12/17/03    Crisafulli Bros.                    
                                                            12              1,150                  07/08/03   07/24/03    Bunkoff                             
                                                            13               -204                  07/08/03   07/24/03    Bunkoff                             
                                                            15              1,205                  07/08/03   07/24/03    Bunkoff                             
                                                            16             -1,050                  07/08/03   07/24/03    Bunkoff                             
                                                            16             -1,010                  07/08/03   07/24/03    Bunkoff                             
                                                            1BC0-04        13,018                  04/26/02   05/30/02    Bunkoff                             
                                                            1BCO-02        -5,361                  04/30/02   05/24/02    Bunkoff                             
                                                            1BCO-06        -4,385                  05/30/02   08/15/02    Bunkoff                             
                                                            1DC0-08         1,664                  04/26/02   05/30/02    Bunkoff                             
                                                            1DCO-03        -5,000                  03/07/02   04/04/02    Bunkoff                             
                                                            1DCO-09           580                  06/17/02   08/15/02    Bunkoff                             
                                                            ACCO-04          -723                  10/16/03   10/23/03    Jupiter Environ.                    
                                                            ACCO-07        -1,100                  03/10/04   04/06/04    Jupiter Environ.                    
                                                            PCCO-04        -3,440                  04/01/02   05/23/02    Crisafulli Bros.                    
 
07-2115   Reconstruction               0-016-007  01/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-003          30,671                  01/26/10   03/18/10    DUNCAN & CAHILL INC                 
                                                            2-022            -126                  09/07/10   09/28/10    DUNCAN & CAHILL INC                 
 
16-1310   Reconstruction               0-016-008  11/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0479   Reconstruction               0-016-009  02/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC3-01        -16,206                  04/06/18   04/12/18    S & L Roofing & Sheetmetal, Inc.    
 
19-1633   Reconstruction               0-016-010  06/10/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -1,127                  05/10/22   03/13/23    Hewitt Young Elec LLC               
                                                            GC-01          22,960                  07/27/21   04/26/22    DUNCAN&CAHILL INC                   
                                                            GC1-01         -8,810                  09/16/22   12/15/23    Zerodraft of CNY Inc                
                                                            GC1-01         -8,810                  10/04/22     /  /      Zerodraft of CNY Inc                
                                                            GC2-02         -5,357                  05/10/22   05/09/23    Duncan&Cahill Inc                   
                                                            MC-01         -30,000                  05/10/22   03/13/23    Family Danz Mech LLC                
 

          Troy Community School:
20-0724   New Construction             0-032-001  03/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            CC-01          22,090                  10/26/22   06/27/23    Stanley Security                    
                                                            EC-01          -2,202                  03/03/22   12/29/22    Harold Clune Inc                    
                                                            EC-03           1,907                  10/04/22   07/27/23    Harold Clune Inc                    
                                                            EC-04           2,014                  10/04/22   07/27/23    Harold Clune Inc                    
                                                            EC-05           2,741                  01/26/23   11/16/23    HAROLD R CLUNE INC                  
                                                            EC-06           3,427                  03/07/23   12/12/23    HAROLD R. CLUNE INC                 
                                                            EC-07          11,156                  04/05/23   12/21/23    Harold R. Clune                     
                                                            EC-08          10,195                  09/06/23   12/28/23    HAROLD R. CLUNE INC.                
                                                            GC-01         -37,500                  10/07/21   07/26/22    Bette&Cring LLC                     
                                                            GC-01          -3,000                  10/07/22     /  /      MLB Const Servs                     
                                                            GC-02          55,862                  01/28/22   02/01/23    Bette&Cring LLC                     
                                                            GC-03         295,829                  02/16/22   02/16/23    Bette&Cring LLC                     
                                                            GC-04           4,282                  05/10/22   05/09/23    Bette&Cring LLC                     
                                                            GC-05           8,245                  05/10/22   05/09/23    Bette&Cring LLC                     
                                                            GC-06           7,364                  06/07/22   05/08/23    Bette&Cring LLC                     
                                                            GC-07          20,231                  07/22/22   05/10/23    Bette&Cring LLC                     
                                                            GC-08          -6,623                  07/22/22   05/10/23    Bette&Cring LLC                     
                                                            GC-11          97,156                  12/02/22   12/21/23    Bette&Cring LLC                     
                                                            GC-12           3,252                  12/02/22   12/14/23    Bette&Cring LLC                     
                                                            GC-13           9,876                  01/26/23     /  /      BETTE & CRING LLC                   
                                                            GC-13TCS        9,876                  01/11/23   09/19/23    BETTE & CRING LLC                   
                                                            GC-14          15,147                  01/26/23   12/15/23    BETTE & CRING LLC                   
                                                            MC-01TCS      -75,110                  04/05/23   12/21/23    RMB MECHANICAL INC.                 
                                                            PC-01           5,848                  06/07/22   04/04/23    RMB Mech Inc                        
                                                            PC-02          10,685                  06/07/22     /  /      RMB Mech Inc                        
                                                            PC-03           2,991                  07/22/22   03/23/23    RMB Mech Inc                        
                                                            PC-04           6,872                  08/30/23     /  /      RMB MECHANICAL INC                  
                                                            PC-05           1,366                  08/30/23     /  /      RMB MECHANICAL                      
                                                            PC-06           1,373                  10/07/22   07/13/23    RMB Mech Inc                        
                                                            PC-07           2,462                  03/07/23   12/12/23    RMB MECH INC                        
                                                            SC-01           5,661                  09/06/23   12/28/23    STANLEY SECURITY                    
 

          XXZak Administration (demo 2015):
15-0141   Reconstruction               1-014-004  08/06/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athlet Field Storage:
10-0583   Reconstruction               2-004-002  04/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          School #2 Boiler Room:
00-1830   New Construction             7-017-002  05/25/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1CC0-01        30,883                  03/07/02   04/04/02    Bunkoff General Contractors         
                                                            1CC0-07        -2,984                  06/17/02   08/15/02    Bunkoff                             
                                                            1CCO-02         6,014                  03/28/02   05/23/02    Bunkoff                             
                                                            1CCO-04        14,634                  04/09/02   05/28/02    Bunkoff                             
 

          District-Wide:
95-0345   Reconstruction               7-999-002  11/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1404   Reconstruction               7-999-004  09/23/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            AA-01         -19,650                  09/04/15   11/17/15    Millstone Remediation Inc.          
                                                            AA-02          10,024                  11/16/15   12/01/15    Millstone Remediation, Inc.         
                                                            AV-01           4,925                  11/16/15   12/01/15    Audio - Video Corporation           
                                                            AV-02           5,413                  03/04/16   03/16/16    Audio-Video Corporation             
                                                            CC-01           6,500                  05/04/15   05/20/15    Advanced Network Services, LLC      
                                                            CC-02         -21,300                  09/04/15   09/15/15    Advanced Network Services LLC       
                                                            CC-03           3,197                  12/20/16   12/28/16    Advanced Network Services, LLC      
                                                            CC-04             988                  12/20/16   12/28/16    Advanced Network Services, LLC      
                                                            CC-05           3,446                  12/20/16   12/22/16    Advanced Network Services, LLC      
                                                            CC-06           2,746                  12/20/16   12/22/16    Advanced Network Services, LLC      
                                                            CC-07           3,688                  12/20/16   12/22/16    Advanced Network Services, LLC      
                                                            EC-01           1,164                  04/30/15   05/18/15    Stilsing Electric Inc.              
                                                            EC-02           3,801                  07/09/15   08/05/15    Stilsing Electric, Inc.             
                                                            EC-03          17,113                  09/04/15   09/15/15    Stilsing Electric Inc.              
                                                            EC-04           1,141                  10/09/15   11/03/15    Stilsing Electric, Inc.             
                                                            EC-05           4,649                  10/09/15   11/03/15    Stilsing Electric, Inc.             
                                                            EC-06           3,639                  03/04/16   03/09/16    Stilsing Electric, Inc.             
                                                            EC-07          19,504                  03/04/16   03/09/16    Stilsing Electric, Inc.             
                                                            EC-08             445                  12/20/16   12/28/16    Stilsing Electric, Inc.             
                                                            LAN-01          2,240                  07/09/15   08/05/15    Annese & Associates, Inc.           
                                                            LAN-02         -2,645                  03/04/16   03/09/16    Annese & Associates, Inc.           
                                                            LAN-03         12,723                  12/20/16   12/22/16    Annese & Associates, Inc.           
                                                            LAN-04         12,386                  12/20/16   02/10/17    Annese & Associates, Inc.           
                                                            SC-01               0                  05/29/15   06/18/15    Stanley Security Systems            
                                                            SC-02          25,690                  03/04/16   03/09/16    Stanley Security Systems            
                                                            SC-03               0                  03/04/16   03/09/16    Stanley Security Systems            
                                                            SC-04           7,986                  03/04/16   03/09/16    Stanley Security Systems            
                                                            SC-05               0                  12/20/16   12/28/16    Stanley Security Systems            
                                                            SC-06          15,000                  12/20/16   12/28/16    Stanley Security Systems            
                                                            SC-07          33,100                  12/20/16   12/28/16    Stanley Security Systems            
 

BOCES QUESTAR III STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-90-00-00
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          John E. Sackett Educ. Center:
02-0412   Alterations                  0-001-001  05/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-1            14,767                  05/10/04     /  /      Beka Construction                   
                                                            4-1            11,375                  05/10/04     /  /      McBain Electrical                   
 
14-0043   Reconstruction               0-001-002  02/25/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0914   Reconstruction               0-001-003  01/10/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-06           -1,021                  01/12/18   01/31/18    Mid-State Industries, Ltd.          
                                                            103-4               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            103-7               0                  11/20/17   12/14/17    Mid-State Industries, Ltd.          
 

          Columbia-Green VoTec Center:
05-1423   Reconstruction               0-021-002  07/13/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2306   Reconstruction               0-021-003  12/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1325   Reconstruction               0-021-004  08/05/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,956                  01/28/13   05/09/13    WAINSCHAF ASSOCIATES INC            
 
12-1071   Reconstruction               0-021-005  06/26/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1           -1,971                  01/22/15   01/23/15    Titan Roofing, Inc.                 
                                                            SC-1            5,055                  01/17/14   02/24/14    HMA Contracting Corp.               
                                                            SC-2             -979                  08/08/14   08/28/14    HMA Contracting Corp.               
                                                            WD-1            7,935                  10/15/14   10/21/14    Mid-State Industries, Ltd.          
                                                            WD-2           -7,181                  12/05/14   12/11/14    Mid State Industeries LTD.          
 
12-0926   Reconstruction               0-021-006  04/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -5,183                  03/03/14   03/21/14    Hoosick Valley Contractors, Inc.    
 
14-0044   Reconstruction               0-021-007  02/25/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1             -753                  01/04/16   01/12/16    ARCON CONSTRUCTION & MANAGEMENT     
                                                            FA-1           27,845                  09/28/15   01/05/17    DLC Electric, LLC                   
                                                            FA-2            1,758                  10/22/15   11/19/15    DLC Electric, LLC                   
                                                            FA-3            3,934                  02/29/16   03/03/16    DLC Electric, LLC                   
                                                            MC-1           -8,718                  11/16/15   12/23/15    Ashley Mechanical, Inc.             
 
16-0893   Reconstruction               0-021-008  01/10/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -3,208                  09/22/17   10/12/17    Mid-State Industries, Ltd.          
                                                            1-02          -13,320                  09/22/17   12/14/17    Mid-State Industries, Ltd.          
                                                            1-03            7,384                  09/22/17   12/14/17    Mid-State Industries, Ltd.          
                                                            1-04           21,777                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            1-05          -12,975                  01/12/18   01/31/18    Mid-State Industries, Ltd.          
                                                            101-1               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            101-2               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            103-1               0                  09/22/17   11/28/17    Mid-State Indudtries, Ltd.          
                                                            103-2               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            103-3               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            103-5               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            103-6               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            103-8               0                  11/20/17   12/14/17    Mid-State Industries, Ltd.          
                                                            104-1               0                  09/22/17   11/28/17    Mid-State Industries, Ltd.          
                                                            2-01           -3,506                  03/19/18   03/20/18    Stilsing Electric, Inc.             
                                                            200-1               0                  11/20/17   12/14/17    Stilsing Electric, Inc.             
                                                            200-2               0                  09/22/17   11/28/17    Stilsing Electric, Inc.             
                                                            200-3               0                  03/06/18   03/22/18    Stilsing Electric, Inc.             
 

          Rensselaer Educational Center:
12-0927   Reconstruction               0-030-002  04/11/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1355   Reconstruction               0-030-003  05/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100A-01             0                  09/17/18   10/15/18    TITAN ROOFING INC                   
                                                            1A-01          -5,360                  02/27/19   03/14/19    TITAN ROOFING, INC.                 
 
18-1389   Reconstruction               0-030-004  03/15/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -11,955                  10/11/19   10/18/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            1-02          -10,969                  10/11/19   10/18/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            1-03            7,280                  10/11/19   10/18/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            1-04           21,160                  10/11/19   10/18/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            1-05          -10,817                  11/25/19   12/27/19    PETER LUIZZI & BROS. CONTRACTING INC
                                                            1-06           -1,505                  11/25/19   12/27/19    PETER LUIZZI & BROS. CONTRACTING INC
                                                            100-01              0                  10/04/19   10/15/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            100-02              0                  10/04/19   10/15/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            100-03              0                  10/04/19   10/15/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            100-04              0                  10/04/19   10/15/19    PETER LUIZZI & BROS. CONTRACTING,INC
                                                            100-05              0                  10/04/19   10/15/19    PETER LUIZZI & BROS. CONTRACTING,INC
 
19-0483   Reconstruction               0-030-005  01/16/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01             -120                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-02           -2,737                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-03             -955                  10/08/20   02/04/21    BUNKOFF GENERAL CONRTACTORS, INC.   
                                                            1-04             -603                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-05              477                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-06           -1,481                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-07            5,817                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-08             -357                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-09              364                  02/04/21   04/12/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            1-10            1,543                  02/04/21   04/12/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-01              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-02              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-03              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-04              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-05              0                  10/08/20   02/04/21    BUNKKOFF GENERAL CONTRACTORS, INC.  
                                                            100-06              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-07              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-08              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-09              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-10              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-11              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-12              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-13              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-14              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-15              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-16              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-17              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-18              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-19              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-20              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-21              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            100-22              0                  10/08/20   02/04/21    BUNKOFF GENERAL CONTRACTORS, INC.   
                                                            2-01          -18,991                  02/04/21   04/12/21    DIGESARE MECHANICAL, INC.           
                                                            200-01              0                  10/08/20   12/04/20    DIGEASRE MECHANICAL, INC.           
                                                            3-01              584                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            3-02           -6,247                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            3-03              348                  02/04/21   03/30/21    MAZONE PLUMBING & HEATING, INC.     
                                                            300-01              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            300-02              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            300-03              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            300-04              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            300-05              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            300-06              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            300-07              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            300-08              0                  10/08/20   12/04/20    MAZONE PLUMBING & HEATING, INC.     
                                                            4-01          -10,663                  10/08/20   12/04/20    CKM ELECTRICAL SERVICES, INC.       
                                                            4-02            6,212                  02/04/21   03/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-03            7,866                  02/04/21   03/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-04           -6,500                  02/04/21   03/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-05            1,240                  04/19/21   07/30/21    CKM ELECTRICAL CONSTRUCTION, INC.   
                                                            4-06              762                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-07            1,865                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-08              286                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-09              530                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-10              874                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-11            1,156                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-12            4,043                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-13            1,681                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-14              800                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-15            1,868                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-16              518                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-17            2,570                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            4-18           -2,154                  04/19/21   07/30/21    CKM ELECTRICAL SERVICES, INC.       
                                                            401-01              0                  10/08/20   12/04/20    CKM ELECTRICAL SERVICES, INC.       
                                                            401-02              0                  10/08/20   12/04/20    CKM ELECTRICAL SYSTEMS, INC.        
                                                            401-03              0                  10/08/20   12/04/20    CKM ELECTRIC SERVICES, INC.         
                                                            401-04              0                  10/08/20   12/04/20    CKM ELECTRICAL SERVICES, INC.       
                                                            401-05              0                  10/08/20   12/04/20    CKM ELECTRICAL SERVICES, INC.       
 
20-0454   Reconstruction               0-030-006  11/18/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01Rev1        3,373                  10/07/21   07/26/22    Wainschaf Associates, Inc           
                                                            1-02           10,152                  10/07/21   07/26/22    Wainshaf Associates, Inc            
                                                            1-03            6,030                  03/18/22   03/29/23    Wainschaf Assocs Inc                
                                                            1-04            5,380                  03/18/22   04/04/23    Wainschaf Assocs Inc                
                                                            1-05            4,271                  09/07/22   08/22/23    Wainschaf Assocs Inc                
                                                            101-01         -5,081                  10/07/21   11/22/22    Wainschaf Associates, Inc           
                                                            101-02         -3,957                  10/07/21   11/22/22    Wainschaf Associates, Inc           
                                                            101-03         -4,129                  10/07/21   11/22/22    Wainschaf Associates, Inc           
                                                            101-04         -3,001                  10/07/21   11/22/22    Wainschaf Associates, Inc           
                                                            101-05         -1,875                  10/07/21   11/22/22    Wainschaf Associates, Inc           
                                                            101-06        -12,175                  10/07/21   11/22/22    Wainschaf Associates, Inc           
                                                            101-07AA            0                  03/18/22   03/29/23    Wainschaf Assocs Inc                
                                                            2-01          -13,884                  03/18/22   04/04/23    RMB Mech Inc                        
                                                            201-01              0                  05/18/21   08/16/21    RMB MECHANICAL, INC.                
                                                            201-02         -4,650                  10/07/21   11/22/22    RMB Mech, Inc                       
                                                            3-01              -93                  03/18/22   04/04/23    Mazone Plumb&Heat Inc               
                                                            3-02             -558                  03/18/22   04/04/23    Mazone Plumb&Heat Inc               
                                                            301-01         -1,192                  10/07/21   11/22/22    Mazone Plumb&Heat                   
                                                            301-02           -743                  10/07/21   11/22/22    Mazone Plumbing&Heat                
                                                            301-03           -616                  10/07/21   11/22/22    Mazone Plumb&Heat                   
                                                            301-04         -3,998                  10/07/21   11/22/22    Mazone Plumb&Heat                   
                                                            301-05           -300                  10/07/21   11/22/22    Mazone Plumb&Heat                   
                                                            301-06         -2,272                  10/07/21   11/22/22    Mazone Plumb&Heat                   
                                                            301-07AA       -3,294                  10/07/21   11/22/22    Mazone Plumb&Heat                   
                                                            301-08AA         -492                  10/07/21   11/22/22    Mazone Plumb&Heat                   
                                                            301-09AA         -995                  10/07/21   11/22/22    Mazone Plumbing&Heat                
                                                            301-10AA            0                  03/18/22   04/04/23    Mazone Plub&Heat                    
                                                            4-01           -3,573                  10/07/21   11/18/22    DLC Electric, LLC                   
                                                            4-02           -5,513                  10/07/21   11/18/22    DLC Electric, LLC                   
                                                            4-03            6,348                  03/18/22   04/04/23    DLC Elec LLC                        
                                                            4-04            3,262                  03/18/22   04/04/23    DLC Elec LLC                        
                                                            4-05            2,586                  03/18/22   04/04/23    DLC Elec LLC                        
                                                            4-06R2         -8,500                  12/14/22     /  /      DLC Elec LLC                        
                                                            401-01              0                  05/18/21   08/16/21    DLC ELECTRIC, LLC                   
                                                            401-02AA       -2,293                  10/07/21   11/22/22    DLC Electric, LLC                   
                                                            401-03AA       -3,049                  10/07/21   11/22/22    DLC Electric, LLC                   
                                                            401-04AA       -1,094                  10/07/21   11/22/22    DLC Electric, LLC                   
                                                            401-05         -1,738                  10/07/21   11/22/22    DLC Electric, LLC                   
                                                            401-05AA            0                  10/07/21     /  /      DLC Electric LLC                    
                                                            401-06AA            0                  03/18/22   04/04/23    DLC Elec LLC                        
                                                            401-07AA            0                  03/18/22   04/04/23    DLC Elec LLC                        
 

          Durham Building:
22-0773   Reconstruction               0-081-002  11/30/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -3,876                  07/12/23     /  /      WAINSCHAF ASSOCIATES                
                                                            1-02           -2,524                  08/23/32     /  /      WAINSCHAF ASSOCIATES, INC           
                                                            101-01              0                  07/12/23     /  /      WAINSCHAF ASSOCIATES                
                                                            101-02              0                  07/12/23     /  /      WAINSCHAF ASSOCIATES                
                                                            101-03              0                  07/12/23     /  /      WAINSCHAF ASSOCIATES                
                                                            101-04              0                  07/12/23     /  /      WAINSCHAF ASSOCIATES                
                                                            101-05              0                  08/23/23     /  /      WAINSCHAF ASSOCIATES, INC           
                                                            101-06              0                  08/23/23     /  /      WAINSCHAF ASSOCIATES, INC           
                                                            101-07              0                  08/23/23     /  /      WAINSCHAF ASSOCIATES                
                                                            101-08              0                  08/23/23     /  /      WAINSCHAF ASSOCIATES                
                                                            101-09              0                  08/23/23     /  /      WAINSCHAF ASSOCIATES                
                                                            401-01              0                  07/12/23   12/28/23    CDE ELECTRIC                        
                                                            401-02              0                  08/23/23   12/18/23    CDE ELECTRIC                        
                                                            401-03              0                  08/23/23   12/18/23    CDE ELECTRIC                        
 

          Rensselaer Trans./ Warehouse:
17-1356   Reconstruction               5-039-002  05/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1B-01          -5,000                  05/09/19   05/29/19    TITAN ROOFING, INC.