MAHOPAC CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 48-01-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Lakeview Elementary:
00-0689   Reconstruction               0-001-007  06/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           4,020                  04/28/03     /  /      Canale Elec.                        
                                                            EC-15          -1,000                  10/22/03   12/04/03    Canale Elec.                        
                                                            GC-3           41,795                  11/07/06   11/14/06    Fourmen Construction                
                                                            PC-01           4,000                  04/16/03     /  /      S&L Plumbing                        
 
99-0392   Reconstruction               0-001-008  03/13/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1418   Reconstruction               0-001-009  05/07/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2308   Reconstruction               0-001-010  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1912   Reconstruction               0-001-011  04/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001            56,620                  08/27/08     /  /      Leed Industries Corp.               
                                                            002             2,000                  10/21/08   11/06/08    LEED INDUSTERIES CORP.              
                                                            003            -3,000                  11/10/08   12/11/08    LEED INDUSTRIES CORP.               
 
08-0327   Reconstruction               0-001-012  10/20/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,844                  08/13/09   09/30/09    FOREMOST ELECTRIC CORPORATION       
 
13-1615   Reconstruction               0-001-013  06/18/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1112   Reconstruction               0-001-014  06/02/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01         -12,230                  08/02/17   10/24/17    Lumar Plumbing & Heating Inc.       
 
17-0922   Reconstruction               0-001-015  01/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1192   Reconstruction               0-001-016  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0500   Reconstruction               0-001-017  03/29/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01           3,039                  08/17/23   12/18/23    S&L PLUMBING & HEATING CORP         
 
02-2172FP Reconstruction               0-001-FP1  07/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Austin Road Elementary:
90-1217   Reconstruction               0-002-004  04/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1045   Reconstruction               0-002-005  04/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0051   Reconstruction               0-002-006  09/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1155   Reconstruction               0-002-007  06/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0391   Additions and Alterations    0-002-009  03/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            ATC-3           2,380                  08/03/05   08/03/05    Directive 3 Energy                  
                                                            ATC-7           2,925                  08/03/05   08/03/05    Energy System                       
                                                            ATC-8           1,995                  08/03/05   08/03/05    Energy Systems                      
                                                            EC-1           13,020                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-10           2,175                  08/03/05   08/03/05    Avanti Building Corporation         
                                                            EC-11             262                  08/01/05   08/03/05    Avanti Building Construction        
                                                            EC-12             248                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-2            1,950                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-3           34,923                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-4           53,265                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-5              275                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-6              870                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-7              423                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-8              340                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-9            3,897                  08/03/05   08/03/05    Avanti Building Construction        
                                                            GC-1           13,678                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-10           4,500                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-11          -3,000                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-12            -750                  08/03/05   08/03/05    Rok Built const. Inc.               
                                                            GC-13           7,416                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-15          29,762                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-2            9,474                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-3           42,202                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-4           38,106                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-5            1,157                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-7            6,785                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-8            1,303                  08/03/05   08/03/05    Rok Built Const. Inc                
                                                            GC-8            3,100                  08/03/05   08/03/05    Rok built Const. Inc.               
                                                            GC-9           11,466                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            MC-1            8,000                  08/03/05   08/03/05    DJH Mechanical Associates           
                                                            PC-1            6,543                  08/03/05   08/03/05    S&L Plumbing & Heating Corp.        
                                                            PC-2            1,612                  08/03/05   08/03/05    S&L Plumbing & Heating Corp.        
                                                            PC-3            5,507                  08/03/05   08/03/05    S&L Plumbing & Heating Corp.        
                                                            RC-2            1,610                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-3            9,800                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-4            3,396                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-5           -2,539                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            WC-1           21,791                  08/03/05   08/03/05    Arrow Steel Window Corp/            
                                                            atc1           32,259                  08/03/05   08/03/05    Energy System                       
                                                            atc2            1,885                  08/03/05   08/03/05    Directive 2 Energy                  
 
03-1281   Reconstruction               0-002-010  03/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          -23,000                  06/21/04   06/23/04    Fourmen Const.                      
 
07-2309   Reconstruction               0-002-011  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0923   Reconstruction               0-002-012  01/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1193   Reconstruction               0-002-013  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0501   Reconstruction               0-002-014  03/29/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-02           2,635                  10/17/22   12/19/23    Renu Contr&Restore Inc              
                                                            GC-03           9,785                  10/17/22   12/19/23    Renu Contract&Restore Inc           
                                                            GC-07           4,040                  08/17/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
                                                            MC-01          17,511                  01/27/23   11/17/23    S&L PLUMB&HEAT CORP                 
 
22-1143   Reconstruction               0-002-015  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2176FP Reconstruction               0-002-FP1  07/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mahopac Falls Elem:
00-0688   Reconstruction               0-003-002  06/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,800                  11/07/06   11/14/06    Fourmen Construction                
                                                            EC-12           3,260                  06/19/03     /  /      Canale Elec.                        
                                                            EC-16           4,000                  10/22/03     /  /      Canale Elec.                        
                                                            EC-18           5,137                  05/03/04     /  /      Canale Elec.                        
 
07-2310   Reconstruction               0-003-004  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0328   Reconstruction               0-003-005  10/20/08  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0924   Reconstruction               0-003-006  01/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1012   Reconstruction               0-003-007  03/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1-01        -4,377                  01/19/21   04/01/21    NIKO K CONSTRUCTION CORP.           
 
20-0510   Reconstruction               0-003-008  02/23/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AB-04           2,400                  10/18/22   05/16/23    Plains Enviroment                   
                                                            EC-01          22,839                  08/16/21   04/20/22    THE PALOMBO GROUP                   
 
20-1194   Reconstruction               0-003-009  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0502   Reconstruction               0-003-010  03/29/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-11          16,961                  08/17/23   12/18/23    RENU CONTRACTING & RESTORATION INC. 
 
22-1144   Reconstruction               0-003-011  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2175FP Reconstruction               0-003-FP1  07/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High:
97-0026   Reconstruction               0-004-006  07/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1620   Reconstruction               0-004-007  07/10/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0691   Additions and Alterations    0-004-008  06/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              22,921                  04/15/03     /  /      Piazza Bros.                        
                                                            1               3,038                  04/16/03     /  /      S&L Plumbing                        
                                                            11              4,853                  07/25/03     /  /      Piazza Bros.                        
                                                            2                 515                  07/25/03     /  /      Piazza Bros.                        
                                                            3              38,207                  07/25/03     /  /      Piazza Bros.                        
                                                            4              13,426                  07/25/03     /  /      Piazza Bros.                        
                                                            EC-01           7,840                  07/25/03     /  /      Canale Electric                     
                                                            EC-02           6,300                  07/25/03     /  /      Canale Electric                     
                                                            EC-03          47,590                  06/27/03     /  /      Canale Electric                     
                                                            EC-04           1,296                  04/16/03     /  /      Canale Electric                     
                                                            EC-05          52,767                  04/16/03     /  /      Canale Electric                     
                                                            EC-06           5,204                  04/16/03     /  /      Canale Electric                     
                                                            EC-07          45,078                  04/16/03     /  /      Canale Electric                     
                                                            EC-09           2,508                  05/12/03     /  /      Canale Electric                     
                                                            EC-10          21,560                  05/12/03     /  /      Canale Electric                     
                                                            EC-11           3,039                  06/24/03     /  /      Canale Electric                     
                                                            EC-13           7,498                  08/19/03     /  /      Canale Electric                     
                                                            EC-14           1,251                  10/22/03   12/04/03    Canale Electric                     
                                                            EC-17           3,694                  05/03/04     /  /      Canale Electric                     
                                                            GC-10          25,465                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-12          45,315                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-13           9,270                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-14           1,585                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-15          10,748                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-16           5,136                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-18          41,102                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-19          24,908                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-20          18,648                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-21          12,055                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-22          19,696                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-23          56,123                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-24           6,618                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-26R         15,383                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-27           4,370                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-28        -325,000                  08/19/03     /  /      Piazza Bros.                        
                                                            GC-29          11,035                  06/27/03     /  /      Piazza Bros.                        
                                                            GC-30          43,233                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-31          23,453                  05/12/03     /  /      Piazza Bros.                        
                                                            GC-32           7,776                  05/16/03     /  /      Piazza Bros.                        
                                                            GC-33           5,525                  06/11/03     /  /      Piazza Bros.                        
                                                            GC-34         -23,425                  06/19/03     /  /      Piazza Bros.                        
                                                            GC-35          -8,471                  06/19/03     /  /      Piazza Bros.                        
                                                            GC-36         -16,600                  06/19/03     /  /      Piazza Bros.                        
                                                            GC-37          16,477                  06/19/03     /  /      Piazza Bros.                        
                                                            GC-38         -21,800                  06/19/03     /  /      Piazza Bros.                        
                                                            GC-39          -5,050                  06/19/03     /  /      Piazza Bros.                        
                                                            GC-40           3,480                  09/16/03     /  /      Piazza Bros.                        
                                                            GC-5          349,296                  07/25/03     /  /      Piazza Bros.                        
                                                            GC-6           10,800                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-7           74,000                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-8           37,701                  04/15/03     /  /      Piazza Bros.                        
                                                            GC-9           13,709                  07/01/03     /  /      Piazza Bros.                        
                                                            HC-01           5,200                  09/03/03   09/10/03    Keyspan Energy                      
                                                            HC-02          35,023                  09/03/03   09/10/03    Keyspan Energy                      
                                                            HC-03          11,323                  04/16/03     /  /      Keyspan Energy                      
                                                            HC-04           2,490                  04/16/03     /  /      Keyspan Energy                      
                                                            HC-05           3,500                  04/16/03     /  /      Keyspan Energy                      
                                                            HC-06           7,766                  05/12/03     /  /      Keyspan Energy                      
                                                            HC-07           6,968                  06/06/03     /  /      Keyspan Energy                      
                                                            HC-08          55,745                  05/30/03     /  /      Keyspan Energy                      
                                                            HC-09           3,678                  05/03/04     /  /      Keyspan Energy                      
                                                            HC-10           2,904                  05/03/04     /  /      Keyspan Energy                      
                                                            HC-11           1,448                  05/03/04     /  /      Keyspan Energy                      
                                                            HC-12           5,100                  05/03/04     /  /      Keyspan Energy                      
                                                            HC-13           8,426                  05/03/04     /  /      Keyspan Energy                      
                                                            P2              6,390                  04/16/03     /  /      S&L Plumbing                        
                                                            PC-03           5,500                  07/25/03     /  /      S&L Plumbing                        
                                                            PC-04           4,292                  07/25/03     /  /      S&L Plumbing                        
                                                            PC-05           1,213                  07/25/03     /  /      S&L Plumbing                        
                                                            PC-06          20,150                  04/16/03     /  /      S&L Plumbing                        
                                                            PC-07          20,099                  04/16/03     /  /      S&L Plumbing                        
                                                            PC-08          28,410                  04/16/03     /  /      S&L Plumbing                        
                                                            PC-09          10,576                  04/16/03     /  /      S&L Plumbing                        
                                                            PC-10          13,984                  04/16/03     /  /      S&L Plumbing                        
                                                            PC-11           3,874                  04/16/03     /  /      S&L Plumbing                        
                                                            PC-12           3,979                  05/12/03     /  /      S&L Plumbing                        
                                                            PC-13           7,754                  05/12/03     /  /      S&L Plumbing                        
                                                            PC-14         100,000                  05/12/03     /  /      S&L Plumbing                        
                                                            TAC-01          1,033                  09/16/03     /  /      TAC Control Systems                 
 
07-2311   Additions and Alterations    0-004-011  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0364   Alterations                  0-004-012  03/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,138                  07/16/09   09/01/09    DEROSA TENNIS                       
                                                            001                 0                  01/26/10   03/03/10    SISCA NORTHEAST INC                 
                                                            001             8,294                  04/27/10   07/20/10    ATLANTIC ELECTRIC INC               
                                                            002             2,870                  07/16/09   09/01/09    DEROSA TENNIS                       
                                                            002             6,730                  02/01/10   03/22/10    SISCA NORTHEAST                     
                                                            002             1,442                  07/16/10   09/13/10    ATLANTIC ELECTRIC CORP              
                                                            002             2,128                  02/10/11   03/03/11    PEARL RIVER P/H dba BERTUSSI'S      
                                                            003             7,608                  07/16/09   09/01/09    DEROSA TENNIS                       
                                                            003             3,154                  04/15/10   06/24/10    SISCA NORTHEAST                     
                                                            003             5,412                  08/03/10   10/29/10    ATLANTIC ELECTRICAL CORP            
                                                            004             2,322                  07/21/09   08/11/09    DEROSA TENNIS                       
                                                            004             7,556                  06/01/10   08/06/10    SISCA NORTHEAST                     
                                                            004             3,952                  10/22/10   10/29/10    ATLANTIC ELECTRICAL CORP            
                                                            005               495                  07/12/10   09/14/10    SISCA nORTHEAST                     
                                                            005             1,941                  10/22/10   10/29/10    ATLANTIC ELECTRICAL CORP            
                                                            006             3,307                  08/03/10   11/05/10    SISCA NORTHEAST                     
                                                            006             1,724                  10/22/10   10/29/10    ATLANTIC ELECTRIC INC               
                                                            007                 0                  08/03/10   09/27/10    SISCA NORTHEAST                     
                                                            007             1,858                  01/25/11   02/28/11    ATLANTIC ELECTRIC INC               
                                                            008             3,370                  08/26/10   09/14/10    SISCA NORTHEAST                     
                                                            008                 0                  01/25/11   02/28/11    ATLANTIC ELECTRIC INC               
                                                            MC-001          8,000                  08/26/10   09/14/10    PEARL RIVER P/H dba BERTUSSI'S      
                                                            PC-001          2,500                  08/26/10   09/14/10    PEARL RIVER P/H dba BERTUSSI'S      
 
10-0099   Reconstruction               0-004-014  09/07/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
12-1010   Reconstruction               0-004-015  09/26/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0220   Reconstruction               0-004-016  10/07/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1113   Reconstruction               0-004-017  06/03/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -10,000                  08/02/17   10/24/17    Ray S. Panel, Inc.                  
                                                            PC-02          -1,880                  05/25/18   06/18/18    LUMAR PLUMBING & HETING INC.        
 
17-0925   Reconstruction               0-004-018  01/04/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-2-01        29,000                  10/24/18   11/28/18    NIKO K CONSTRUCTION                 
                                                            RC-2-02        -4,290                  05/17/19   07/02/19    NIKO K. CONSTRUCTION                
                                                            RC-2-03        -4,290                  12/10/18   01/22/19    NIKO K CONSTRUCTION                 
 
19-1013   Reconstruction               0-004-019  03/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-2-02        13,372                  12/31/20   03/16/21    BARRETT ROOFS, INC.                 
                                                            SLC-01          1,345                  09/15/20   11/06/20    MUSCO SPORTS LIGHTING, LLC          
 
20-0511   Reconstruction               0-004-020  02/23/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AB-01          35,900                  04/13/22   03/08/23    Plains Environs                     
                                                            AB-02           4,629                  10/03/22   08/08/23    Plains Envirment                    
                                                            AB-03          65,000                  10/03/22   08/08/23    Plains Envirntl                     
                                                            AB-05          72,846                  03/27/27     /  /      PLAINS ENVIROMENTAL                 
                                                            CE-01          21,334                  12/13/21   01/13/23    Tristate Contract Sales LLC         
                                                            CE-02           2,254                  12/13/21   01/13/23    Tristate Contract Sales LLC         
                                                            CE-03          -3,064                  05/05/22   05/09/23    Tristate Contract Sales LLC         
                                                            CE-04             865                  05/25/22   04/20/23    Tristate Contr Sales LLC            
                                                            EC-014          4,960                  11/24/21   12/14/22    Fanshawe Inc                        
                                                            EC-02          12,422                  08/16/21   04/20/22    FANSHAWE, INC                       
                                                            EC-03           1,872                  08/24/21   05/06/22    FANSHAWE, INC                       
                                                            EC-04           5,543                  09/20/21   12/01/22    Fanshawe, Inc                       
                                                            EC-05           4,608                  09/20/21   12/01/22    Fanshawe, Inc                       
                                                            EC-06           3,765                  10/14/21   12/06/22    Fanshawe, Inc                       
                                                            EC-07          26,138                  10/14/21   12/06/22    Fanshawe Inc                        
                                                            EC-08            -925                  10/14/21   12/06/22    Fanshawe, Inc                       
                                                            EC-09           4,157                  11/01/21   08/30/22    Fanshawe, Inc                       
                                                            EC-10             815                  11/01/21   09/06/22    Fanshawe, Inc                       
                                                            EC-11             765                  11/02/21   12/09/22    Fanshawe, Inc                       
                                                            EC-12           1,719                  11/02/21   12/09/22    Fanshawe, Inc                       
                                                            EC-13           1,447                  11/22/21   12/14/22    Fanshawe Inc                        
                                                            EC-15           3,165                  11/24/21   12/14/22    Fanshawe Inc                        
                                                            EC-16             537                  11/24/21   12/15/22    Fanshawe Inc                        
                                                            EC-17           3,422                  12/30/21   10/18/22    Fanshawe Inc                        
                                                            EC-20          19,829                  12/29/21   10/18/22    Fanshawe Inc                        
                                                            EC-21          16,140                  01/24/22   11/15/22    Fanshawe Inc                        
                                                            EC-22           1,762                  01/24/22   11/15/22    Fanshawe Inc                        
                                                            EC-23          11,022                  01/24/22   11/15/22    Fanshawe Inc                        
                                                            EC-24           7,273                  01/31/22   02/08/23    Fanshawe Inc                        
                                                            EC-25           8,170                  03/07/22   03/27/23    Fanshawe Inc                        
                                                            EC-27           5,016                  03/28/22   04/04/23    Fanshawe Inc                        
                                                            EC-28           1,177                  04/25/22   04/17/23    Fanshawe Inc                        
                                                            EC-30          14,171                  05/11/22   03/13/23    Fanshawe Inc                        
                                                            EC-33          13,331                  10/18/22   10/24/23    Fanshawe Inc                        
                                                            EC-34           1,254                  10/18/22   05/16/23    Fanshawe Inc                        
                                                            EC-35           2,268                  01/27/23   11/17/23    ROCKLAND ELEC                       
                                                            EC-40           6,552                  08/03/23   12/29/23    FANSHAWE                            
                                                            GC-01          -1,500                  01/24/22   01/31/23    Piazza Inc                          
                                                            GC-02          -3,000                  01/24/22   01/31/23    Piazza Inc                          
                                                            GC-03          11,824                  12/09/22   12/19/23    Piazza Inc                          
                                                            GC-04           3,626                  12/15/22   12/05/23    Piazza Inc                          
                                                            MC-01         143,713                  11/15/21   12/12/22    MDS HVAC-R                          
                                                            MC-02          -5,016                  04/25/22   04/17/23    MDS HVAC-R                          
                                                            MC-03          28,040                  04/25/22   04/17/23    MDS HVAC-R                          
                                                            MC-04           3,942                  06/30/22   05/09/23    MDS HVAC-R                          
                                                            PC-01          24,768                  09/10/21   11/28/22    S&L Plumbing&Heating Corp           
                                                            PC-02          27,000                  09/16/21   12/01/22    S&L Plumbing &Heating Corp          
                                                            PC-03          10,640                  09/20/21   12/01/22    S&L Plum&Heat Corp                  
                                                            PC-05           1,768                  11/22/21   12/14/22    S&L Plumbing&Heat Corp              
                                                            PC-06           3,069                  03/07/22   03/27/23    S&L Plumb&Heat Corp                 
                                                            PC-07           3,064                  05/05/22   02/09/23    S&L Plumb&Heating  Corp             
                                                            PC-09          10,084                  12/16/22   11/27/23    S&L Plumb&Heat Corp                 
                                                            PC-11          -1,068                  08/03/23   12/29/23    S&L PLUMBING & HEATING CORP         
                                                            PC-8             -865                  05/25/22   04/04/23    S&L Plumb&Heat Corp                 
                                                            SEC-01         23,490                  05/25/22   04/04/23    Day Automation                      
                                                            SEC-02         22,789                  05/25/22   04/04/23    Day Automation                      
 
20-1195   Reconstruction               0-004-021  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1542   Reconstruction               0-004-022  08/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fulmar Road Elementary:
90-1218   Reconstruction               0-005-003  04/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0690   Reconstruction               0-005-005  06/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1123   Reconstruction               0-005-009  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2312   Reconstruction               0-005-011  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0329   Reconstruction               0-005-013  10/20/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0365   Additions and Alterations    0-005-014  03/06/09  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1014   Reconstruction               0-005-015  03/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01          -4,281                  05/27/21   08/12/21    J&M Heating and AC                  
                                                            RC-3-01         2,397                  09/15/20   11/06/20    BARRETT ROOFS, INC.                 
                                                            RC-3-02        10,908                  09/15/20   11/06/20    BARRETT ROODS, INC.                 
                                                            RC-3-03         2,815                  09/15/20   11/06/20    BARRETT ROOFS, INC.                 
 
20-1196   Reconstruction               0-005-016  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0503   Additions and Alterations    0-005-017  03/29/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          38,700                  10/17/22   12/19/23    Renu Contr&Restore Inc              
                                                            GC-04           3,512                  01/27/23   12/22/23    RENU CONTRACTING & RESTORATION INC  
                                                            GC-05            -786                  03/20/23   12/19/23    RENU CONTRACTING & RESTORATION INC  
                                                            GC-08           3,587                  08/17/23   12/18/23    RENU CONTRACTING & RESTORATION INC  
                                                            GC-08           4,231                  08/21/23     /  /      RENU CONTRACTING                    
                                                            GC-09          60,583                  08/17/23     /  /      RENU CONTRACTING & RESTORATION INC  
                                                            MC-02          20,700                  01/27/23   11/17/23    S&L PLUMB&HEAT CORP                 
                                                            PC-01           6,962                  11/30/22   06/06/23    Lets Go Entrps Inc                  
 
22-1145   Reconstruction               0-005-018  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2174FP Reconstruction               0-005-FP1  07/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mahopac Middle School:
99-0393   Additions and Alterations    0-006-005  03/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ATC-1          41,048                  08/03/05   08/03/05    Energy Systems                      
                                                            ATC-3           2,475                  08/03/05   08/03/05    Energy Systems                      
                                                            ATC-4          25,597                  08/03/05   08/03/05    Energy Systems                      
                                                            ATC-5          24,000                  08/03/05   08/03/05    Energy Systems                      
                                                            ATC-6           9,022                  08/03/05   08/03/05    Energy Sysytems                     
                                                            ATC-8          40,427                  08/03/05   08/03/05    Energy Sytems                       
                                                            CC-1           16,055                  08/03/05   08/03/05    McHugh Specialty Furnishings        
                                                            CC-2            2,000                  08/03/05   08/03/05    McHugh Specialty Furnshings         
                                                            CC-7           -4,453                  08/03/05   08/03/05    McHugh Specialty Furnishings        
                                                            EC-1            4,600                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-10          10,657                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-11           1,075                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-13           9,800                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-14             800                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-15             262                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-16             937                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-17          14,570                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-18           6,897                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-19          30,889                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-2           75,945                  08/03/05   08/03/05    Avanti Building School              
                                                            EC-20           5,956                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-3            1,495                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-4            2,200                  08/03/05   08/03/05    Avanti Buliding Construction        
                                                            EC-6            1,452                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-7            8,800                  08/03/05   08/03/05    Avanti Building Construction        
                                                            EC-9            4,770                  08/03/05   08/03/05    Avanti Building Construction        
                                                            GC-1           10,787                  08/03/05   08/03/05    Rok Built Contst. Inc.              
                                                            GC-10           3,357                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-11          16,500                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-12           4,765                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-13           8,451                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-14          -6,050                  08/03/05   08/03/05    Rok Built                           
                                                            GC-15         -17,550                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-16          -8,500                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-17          -2,500                  08/03/05   08/03/05    Rok Built Const. Inc                
                                                            GC-18          55,254                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-19           4,453                  08/03/05   08/03/05    Rok Built Const. Inc                
                                                            GC-2            5,584                  08/03/05   08/03/05    ROK BUILT CONST. INC.               
                                                            GC-20           1,100                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-4           35,857                  08/03/05   08/03/05    Rok built const. inc.               
                                                            GC-5           12,274                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-6            2,710                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-7            1,897                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-8           19,215                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            GC-9            4,406                  08/03/05   08/03/05    Rok Built Const. Inc.               
                                                            MC-1           13,515                  08/03/05   08/03/05    DJH Mechanical Associates           
                                                            PC-1            3,550                  08/03/05   08/03/05    S&L Plumbing & Heating Corp.        
                                                            PC-10           1,303                  08/03/05   08/03/05    S&L Plumbing & Heating Corp.        
                                                            PC-11           2,297                  08/03/05   08/03/05    S&L Plumbin & Heating Corp.         
                                                            PC-3           12,368                  08/03/05   08/03/05    S&L Plumbing & Heating              
                                                            PC-4           20,570                  08/03/05   08/03/05    S&L Plumbing & Heating              
                                                            PC-5           12,054                  08/03/05   08/03/05    S&L Plumbing & Heating              
                                                            PC-6            6,921                  08/03/05   08/03/05    S&L Plumbing & Heating Corp         
                                                            PC-7              304                  08/03/05   08/03/05    S&L Plumbing & Heating              
                                                            Pc-2            1,321                  08/03/05   08/03/05    S&L Plumbing & Heating Corp.        
                                                            RC-1            1,200                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-2            2,100                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-4            3,400                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-5              400                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-6            2,000                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-8            1,921                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            RC-9              850                  08/03/05   08/03/05    Don Adams Roofing Co. Inc.          
                                                            SS-1            4,500                  08/03/05   08/03/05    Scarsdale Security Systems          
                                                            WC-2            4,000                  08/03/05   08/03/05    Arrow Steel Window Corp.            
                                                            WC-3            1,265                  08/03/05   08/03/05    Arrow Steel Window Corp.            
                                                            atc-2          17,582                  08/03/05   08/03/05    Energy Systems                      
                                                            eC-1           28,653                  08/03/05   08/03/05    Arrow  Steel Window Corp.           
 
03-1280   Reconstruction               0-006-007  03/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          -23,000                  06/11/04   06/23/04    Fourmen Const.                      
 
04-0203   Additions and Alterations    0-006-008  01/27/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1203   Reconstruction               0-006-010  07/08/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2313   Reconstruction               0-006-011  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1015   Reconstruction               0-006-012  03/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-2-01         5,395                  11/16/20   02/10/21    BARRETT ROOFS, INC.                 
 
20-0512   Reconstruction               0-006-013  02/23/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-37           3,042                  08/03/23   12/29/23    FANSHAWE                            
                                                            EC-38             477                  08/03/23   12/29/23    FANSHAWE                            
                                                            SC-02          63,000                  08/30/22     /  /      Landscape Unlimited Inc             
                                                            SC-03          -3,042                  08/03/23   12/21/23    LANDSCAPE UNLIMITED                 
 
20-1197   Reconstruction               0-006-014  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0504   Reconstruction               0-006-015  03/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2173FP Reconstruction               0-006-FP1  07/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Office (see7-012):
20-1198   Reconstruction               1-012-001  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
97-0984   Reconstruction               5-010-005  02/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2314   Reconstruction               5-010-007  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0330   Reconstruction               5-010-008  10/20/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             6,337                  08/13/09     /  /      FOREMOST ELECTRIC CORPORATION       
 
20-0513   Reconstruction               5-010-009  02/23/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-10           1,848                  12/30/21   10/18/22    Fanshawe Inc                        
                                                            EC-18           6,094                  12/30/21   10/18/22    Fanshawe Inc                        
                                                            EC-26           2,951                  03/28/22   04/04/23    Fanshawe Inc                        
                                                            EC-29           3,094                  04/25/22   04/17/23    Fanshawe Inc                        
                                                            EC-31           5,196                  10/03/22   08/08/23    Fanshawe Inc                        
 
20-1199   Reconstruction               5-010-010  06/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mahopac Public Library:
01-0430   New Construction             6-017-002  06/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,328                  04/17/09   03/25/09    ROK-BUILT                           
                                                            001             1,800                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            001             1,930                  04/17/09     /  /      RICHARD S. BELL                     
                                                            001             3,866                  04/17/09   03/25/09    CLEAN AIR QUALITY SERVICE           
                                                            001               500                  04/17/09   03/25/09    SRI FIRE SPRINKLER                  
                                                            002             9,400                  04/17/09   03/25/09    ROK-BUILT                           
                                                            002               926                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            002             1,450                  04/17/09   03/25/09    RICHARD S. BELL                     
                                                            002             1,591                  04/17/09   03/25/09    CLEAR AIR QUAILTY SERVICE           
                                                            002               988                  04/17/09   03/25/09    SRI FIRE SPRINKLER                  
                                                            003              -500                  04/17/09   03/25/09    ROK-BUILT                           
                                                            003               742                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            003             7,731                  04/17/09     /  /      CLEAN AIR QUALITY SERVICE           
                                                            004            -4,801                  04/17/09   03/25/09    ROK-BUILT                           
                                                            004             4,251                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            004             6,295                  04/17/09   03/25/09    CLEAN AIR QUALITY SERVICE           
                                                            005              -675                  04/17/09   03/25/09    ROK-BUILT                           
                                                            005             1,326                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            006             1,113                  04/17/09   03/25/09    PACELINE CONSTRUCTION CORPORATION   
                                                            006            24,547                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            007             1,491                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            007               536                  04/17/09   03/25/09    ROK-BUILT                           
                                                            008             1,386                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            008             1,500                  04/17/09   03/25/09    ROK-BUILT                           
                                                            009             4,779                  04/17/09   03/25/09    ACORN ELECTRIC                      
                                                            009               400                  05/17/09   03/25/09    ROK-BUILT                           
                                                            010               801                  04/17/09   03/25/09    ACRON ELECTRIC                      
                                                            010             4,158                  04/17/09   03/25/09    ROK-BUILT                           
                                                            011           -10,000                  04/17/09   03/25/09    ROK-BUILT                           
                                                            012             4,736                  04/17/09   03/25/09    ROK-BUILT                           
                                                            013            10,502                  04/17/09   03/25/09    ROK-BUILT                           
                                                            015             3,667                  04/17/09   03/25/09    ROK-BUILT                           
                                                            016             3,300                  04/17/09     /  /      ROK-BUILT                           
                                                            017             6,316                  04/17/09   03/25/09    ROK-BUILT                           
                                                            018               203                  04/17/09   03/25/09    ROK-BUILT                           
                                                            019             5,501                  04/17/09   03/25/09    ROK-BUILT                           
                                                            020               957                  04/17/09     /  /      ROK-BUILT                           
                                                            021            15,679                  04/17/09   03/25/09    ROK-BUILT                           
                                                            022             8,429                  04/17/09   03/25/09    ROK-BUILT                           
                                                            024               655                  04/17/09   03/25/09    ROK-BUILT                           
                                                            025               404                  04/17/09   03/25/09    ROK-BUILT                           
                                                            026             1,691                  04/17/09   03/25/09    ROK-BUILT                           
                                                            027            -1,547                  04/17/09   03/25/09    ROK-BUIKT                           
                                                            028               300                  04/17/09   03/25/09    ROK-BUILT                           
                                                            029               725                  04/17/09   03/25/09    ROK-BUILT                           
                                                            030             1,471                  04/17/09   03/25/09    ROK-BUILT                           
                                                            031             1,034                  04/17/09   03/25/09    ROK-BUILT                           
                                                            032             3,120                  04/17/09   03/25/09    ROK-BUILT                           
                                                            033               934                  04/17/09   03/25/19    ROK-BUILT                           
                                                            034               320                  04/17/09   03/25/09    ROK-BUILT                           
                                                            035               614                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            036             3,564                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            037            12,000                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            038             7,500                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            039             4,500                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            040             1,843                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            041               665                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            042             2,300                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            043            14,000                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            044               800                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            045             1,200                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            046               337                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            047             2,750                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO            
                                                            048            -2,800                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO.           
                                                            049            -1,000                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO.           
                                                            050            -3,500                  04/17/09   03/25/09    PACELINE CONSTRUCTION CO./          
 
01-0242   Reconstruction               6-017-003  09/28/01  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1091   Reconstruction               6-017-004  06/22/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            gc-01         -21,900                  05/11/23   12/22/23    Grace Contracting & Development     
 

          XXOld District Office - see 1-012:
92-0842   Additions and Alterations    7-012-003  04/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2315   Reconstruction               7-012-006  03/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dugout @ Mahopac Falls Elem.:
01-1288   New Construction             7-020-001  05/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand/Restrooms:
03-0739   New Construction             7-021-001  06/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          FRES Pump Station (pit with cover):
06-1343   New Construction             7-022-001  06/07/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          MSHS Treatment Plant:
09-0276   New Construction             7-024-001  12/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mahopac Pump House:
20-0514   New Construction             7-026-001  02/23/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-32           3,699                  10/18/22   10/24/23    Fanshawe Inc                        
                                                            EC-36           2,227                  03/20/23   12/19/23    FANSHAWE, INC                       
                                                            EC-39           2,258                  08/03/23   12/29/23    FANSHAWE                            
                                                            PC-04           3,026                  10/14/21   12/06/22    S&L Plumb&Heat Corp                 
                                                            PC-10           2,047                  08/03/23   12/29/23    S&L PLUMBING & HEATING              
                                                            SC-01           5,040                  08/22/22   12/14/23    Landscape Unlimited Inc             
 
22-1146   Reconstruction               7-026-002  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
21-0629   Reconstruction               7-999-002  03/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1400EP Energy Project               7-999-E01  04/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE

CARMEL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 48-01-02-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Kent Elementary School:
91-0577   Reconstruction               0-001-004  01/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0772   Additions and Alterations    0-001-005  03/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0320   Reconstruction               0-001-006  11/17/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0600   Reconstruction               0-001-007  01/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,000                  05/02/01   01/14/02    All State Power-Vac                 
 
02-0672   Additions and Alterations    0-001-008  04/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           1,800                  03/14/05   03/31/05    Barrett roofing Supply              
                                                            GC-09           4,239                  09/29/04   10/04/04    Meyer Contracting                   
                                                            GC-15           2,442                  10/05/04   10/12/04    Meyer Contracting                   
                                                            GC-20            -360                  01/20/05   03/17/05    Meyer Contracting                   
                                                            GC-23           3,129                  02/24/05   03/31/05    Meyer Contracting                   
                                                            GC-24           4,835                  02/24/05   03/31/05    Meyer Contracting                   
                                                            GC-31           1,989                  02/24/05   03/31/05    Meyer Contracting                   
                                                            GC-36           9,324                  03/14/05   06/10/05    Meyer Contracting                   
                                                            PC-03           5,251                  01/20/05   06/30/05    S and L Plumbing                    
                                                            PC-06             884                  03/24/05   04/26/05    S and L Plumbing                    
 
01-0701   Reconstruction               0-001-009  05/09/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01           4,500                  09/29/04   10/14/04    Hudson Valley Elec.                 
                                                            EC-05             400                  06/09/05   06/30/05    Hudson Valley                       
                                                            GC-01          10,600                  09/29/04   10/04/04    Meyer Contracting                   
                                                            GC-39           5,044                  05/17/05   06/14/05    Meyer Contracting                   
                                                            GC-6           41,900                  09/29/04   10/04/04    Meyer Contracting                   
 
08-0502   Reconstruction               0-001-011  03/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01           8,758                  09/09/10   09/28/10    UNITY MECHANICAL CORP               
                                                            PC-01         -13,026                  09/09/10   09/28/10    S&L PLUMBING AND HEATING CORP       
 
09-0937   Reconstruction               0-001-012  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0621   Reconstruction               0-001-013  05/15/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01           8,078                  04/21/17   05/21/17    RENU Contracting                    
 
14-0859   Reconstruction               0-001-014  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0150   Reconstruction               0-001-015  08/17/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         12,320                  10/29/19   12/11/19    JJ CURRAN                           
                                                            GC-002            996                  10/29/19   12/11/19    JJ CURRAN                           
 
19-0316   Reconstruction               0-001-016  01/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-KE-01      -14,144                  10/19/20   02/16/21    BARRETT ROOFS, INC.                 
 
20-0990   Reconstruction               0-001-017  04/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1677   Reconstruction               0-001-018  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1233FP Reconstruction               0-001-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Carmel High School:
92-0750   Reconstruction               0-003-003  04/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0773   Reconstruction               0-003-004  03/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1597   Reconstruction               0-003-006  06/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0098   Reconstruction               0-003-007  11/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0704   Additions and Alterations    0-003-008  03/04/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,473                  11/12/02   11/13/02    Doria Const.                        
 
01-0702   Additions and Alterations    0-003-009  05/09/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02           8,324                  10/09/03   10/14/03    Southeast Mechanical Corp.          
                                                            GC-1Rev.      -20,000                  10/09/03   10/14/03    Southeast Mech.                     
 
02-1061   Reconstruction               0-003-010  05/19/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           9,194                  09/29/04   12/24/04    Hudson Valley Electrical            
                                                            EC-03         -15,764                  02/11/05   03/02/05    Hudson Valley Electrical Constructio
                                                            EC-09           1,201                  06/09/05   07/20/05    Hudson Valley                       
                                                            EC-10           6,857                  06/29/05   07/20/05    Hudson Valley                       
                                                            GC-05          26,400                  09/29/04   12/24/04    Meyer Contracting Corp              
                                                            GC-08          12,834                  09/29/04   12/24/04    Meyer Contracting Corp              
                                                            GC-12          11,800                  09/29/04   12/24/04    Meyer Contracting Corp              
                                                            GC-14           1,251                  09/29/04   12/24/04    Meyer Contracting Corp              
                                                            GC-17           7,000                  10/05/04   10/18/04    Meyer Contracting Corp              
                                                            GC-19            -600                  01/20/05   03/17/05    Meyer Contracting                   
                                                            GC-21           4,896                  01/20/05   03/17/05    Meyer Contracting                   
                                                            GC-29           5,115                  02/24/05   03/23/05    Meyer Contracting                   
                                                            GC-30           7,357                  02/24/05   03/23/05    Meyer Contracting                   
                                                            GC-32             514                  03/14/05   03/31/05    Meyer Contracting                   
                                                            GC-33          10,535                  03/14/05   03/31/05    Meyer Contracting                   
                                                            GC-34           7,255                  03/14/05   03/31/05    Meyer Contracting                   
                                                            GC-38           7,494                  05/17/05   07/13/05    Meyer Contracting                   
                                                            PC-04             955                  01/20/05   03/17/05    S and L Plumbing                    
                                                            PC-09           5,702                  03/24/05   06/15/05    s and L Plumbing                    
                                                            PC-11           1,812                  06/22/05   07/11/05    S and L plumbing                    
                                                            RC-01           1,500                  04/04/05   04/18/05    Hi Tech Contracting                 
                                                            SC-01         -25,000                  10/05/04   10/18/04    Popoli Construction                 
                                                            SC-3            3,412                  02/11/05   03/02/05    Popoli Construction                 
                                                            SC-4            1,134                  02/11/05   03/02/05    Popoli Construction                 
 
04-0711SR Additions and Alterations    0-003-012  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
 
04-1352   Additions and Alterations    0-003-012  10/11/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             3,236                  11/13/08   04/07/09    MELWOOD CONTRACTING CORP.           
                                                            002             3,236                  11/13/08     /  /      MELWOOD CONTRACTING CORP.           
                                                            004             3,660                  11/13/08   05/13/09    MELWOOD CONTRACTING CORP.           
                                                            005             2,500                  11/13/08   05/13/09    MELWOOD CONTRACTING CORP.           
                                                            006             2,600                  11/13/08   05/08/09    MELWOOD CONTRACTING CORP.           
                                                            007            10,700                  11/13/08   05/08/09    MELWOOD CONTRACTING CORP.           
                                                            008             1,600                  11/13/08   05/08/09    MELWOOD CONTRACTING CORP.           
                                                            01             15,674                  12/04/08   04/22/09    ARROW STEEL WINDOW CORP.            
                                                            010             5,421                  09/16/08   10/21/08    MELWOOD CONTRACTING                 
                                                            010             1,540                  09/10/08   01/26/09    MENGLER MECHANICAL                  
                                                            011             2,226                  09/10/08   10/30/08    MELWOOD CONTRACTING CORP            
                                                            011            75,000                  07/09/10   12/03/10    MENGLER MECHANICAL INC              
                                                            012            10,800                  09/24/08   10/21/08    MELWOOD CONTRACTING CORP.           
                                                            013             2,710                  10/30/08   12/02/08    MELWOOD CONTRACTING CORP.           
                                                            014            -1,200                  10/30/08   02/19/09    MELWOOD CONTRACTING CORP.           
                                                            015               960                  03/02/09   04/23/09    MELWOOD CONTRACTING CORPORATION     
                                                            09              8,377                  08/13/08     /  /      MENGLER MECHANICAL, INC.            
                                                            09              5,200                  11/13/08   05/08/09    MELWOOD CONTRACTING CORP.           
                                                            1              11,200                  07/07/08   10/24/08    Hudson Valley Roofing               
                                                            1                   0                  11/13/08     /  /      MELWOOD CONTRACTING CORP. 2310      
                                                            1               2,310                  11/13/09   04/07/09    MELWOOD CONTRACTING CORP.           
                                                            13           -450,479                  11/10/08   05/18/09    GLENMAN INDUSTRIAL & COMMERCIAL CONT
                                                            16             -2,000                  04/24/09   08/12/09    MELWOOD CONTRACTING CORPORATION     
                                                            17            -20,000                  07/11/11   09/09/11    MELWOOD CONTRACTING CORPORATION     
                                                            2               5,388                  07/07/08   10/24/08    Hudson Valley Roofing               
                                                            3              10,800                  11/13/08   05/13/09    MELWOOD CONTRACTING CORP.           
                                                            EC-01         -20,200                  08/02/06   01/12/07    RLJ Electric                        
                                                            EC-02           1,935                  08/02/06   01/12/07    RLJ Electric                        
                                                            EC-03           1,735                  08/02/06   01/12/07    RLJ Electric                        
                                                            EC-04          29,478                  08/02/06   01/12/07    RLJ Electric                        
                                                            EC-05          41,443                  08/02/06   01/12/07    RLJ Electric                        
                                                            EC-06           1,305                  08/24/06   01/09/07    RLJ Electric Corp                   
                                                            EC-07             905                  01/19/07   02/09/07    RLJ Electric                        
                                                            EC-08           4,961                  11/15/06   11/06/08    RLJ Electric orp                    
                                                            EC-09           9,857                  07/12/10   11/17/10    ELJ ELECTRIC COMPANY                
                                                            EC-10           9,895                  07/12/10   11/17/10    RLJ ELECTRIC CORPORATION            
                                                            EC-11           9,773                  07/12/10   11/17/10    RLJ ELECTRIC CORPORATION            
                                                            EC-12           7,529                  07/12/10   11/17/10    RLJ ELECTRIC CORPORATION            
                                                            EC-13          16,098                  07/12/10   11/17/10    RLJ ELECTRIC CORPORATION            
                                                            EC-14          10,358                  07/12/10   11/17/10    RLJ ELECTRIC CORPORATION            
                                                            EC-15           7,150                  07/12/10   11/17/10    RLJ ELECTRIC CORPORATION            
                                                            EC-16           5,000                  07/12/10   11/17/10    RLJ ELECTRIC CORPORATION            
                                                            GC-01        -336,350                  07/10/06   08/14/06    Glenman Industrial Commercial       
                                                            GC-02         -42,349                  07/10/06   08/14/06    Glenman Industrial Commercial       
                                                            GC-03         -34,950                  07/10/06   08/14/06    Glenman Indusrial Commercial        
                                                            GC-04          -6,300                  07/10/06   08/14/06    Glenman Industrial Commercial       
                                                            GC-05          18,874                  12/10/07   01/09/08    GLENMAN INDUSTRIAL & CO             
                                                            GC-06          14,948                  12/10/07   01/09/08    GLENMAN INDUSTRIAL & CO             
                                                            GC-07          -1,300                  12/10/07   01/09/08    GLENMAN INDUSTRIAL & CO             
                                                            GC-08           7,761                  12/10/07   01/09/08    GLENMAN INDUSTRIAL & CO.            
                                                            GC-08           7,761                  12/10/07   01/09/08    GLENMAN INDUSTRIAL & CO             
                                                            GC-09          17,188                  12/10/07   01/09/08    GLENMAN INDUSTRIAL CO.              
                                                            GC-09          17,188                  12/10/07   01/09/08    GLENMAN INDUSTRIAL & CO             
                                                            GC-10          14,801                  01/03/08   01/28/08    GLENMAN INDUSTRIAL & COMPANY        
                                                            GC-11          16,100                  09/29/08   10/27/08    GLENMAN INDUSTRIAL & COMMERCIAL     
                                                            GC-12          12,913                  09/29/08   10/27/08    GLENMAN INDUSTRIAL & COMMERCIAL CONT
                                                            HC-01         -27,600                  09/12/06     /  /      Mengler Mechanical                  
                                                            HC-02        -200,850                  09/12/06     /  /      Mengler Mechanical                  
                                                            HC-03           8,138                  11/15/06   01/09/07    Mengler Mechanical                  
                                                            HC-04           7,576                  01/19/07   02/09/07    Mengler Mechanical                  
                                                            HC-05          31,426                  11/26/07   01/28/08    MENGLER MECHANICAL                  
                                                            HC-06          32,665                  11/26/07   01/28/08    MENGLER MECHANICAL                  
                                                            HC-07          16,127                  11/26/07   01/28/08    MENGLER MECHANICAL                  
                                                            HC-08           4,997                  11/26/07   01/28/08    MENGLER MECHANICAL                  
                                                            PC-01          -7,700                  07/10/06   08/14/06    Frank Lindy Plumbing                
                                                            PC-02          -4,129                  11/15/06   01/09/07    Frank Lindy Plumbing                
                                                            PC-03          14,147                  06/27/07   10/26/07    Frank Lindy Plumbing                
                                                            SD-01          10,500                  09/01/05   10/28/05    Northbrook Contracting              
                                                            SD-02           7,465                  09/01/05   10/28/05    Northbrook Contracting Corp         
                                                            SD-03          16,668                  12/13/05   07/13/06    Northbrook Contracting              
                                                            SD-04          13,360                  12/13/05   07/13/06    Northbrook Contracting Corp         
                                                            SD-05          43,258                  10/06/05     /  /      Northbrook Contracting Corp         
                                                            SD-06           2,100                  10/06/05   10/28/05    northbrook Contracting              
                                                            SD-07           4,168                  12/01/05   07/24/06    Northbrook Contracting Corp         
 
08-0503   Reconstruction               0-003-013  03/06/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0095   Reconstruction               0-003-014  03/24/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -27,200                  07/13/11   09/13/11    LANDSCAPE UNLIMITED INC             
 
09-0938   Reconstruction               0-003-015  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0217   Reconstruction               0-003-016  03/02/12  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1155   Reconstruction               0-003-017  05/16/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0622   Reconstruction               0-003-019  05/15/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CCD-001       -18,746                  07/07/17     /  /      Pearl River Plumbing, Heating, & Ele
                                                            CO-02         -11,492                  04/21/17   05/12/17    RENU Contracting                    
                                                            EC-001         11,073                  04/16/16   05/04/16    Pat Kerns Electric, LTD.            
                                                            EC-002          8,621                  04/16/16   05/04/16    Pat Kerns Electric, LTD.            
                                                            GC-001          5,692                  04/16/16   05/04/16    Landtek Group, Inc.                 
                                                            GC-002          9,027                  04/16/16   05/04/16    LandTek Group, Inc.                 
                                                            GC-003          6,109                  04/16/16   05/04/16    LandTek Group, Inc.                 
                                                            GC-004           -358                  04/16/16   05/04/16    LandTek Group, Inc.                 
                                                            GC-005          4,571                  04/16/16   05/04/16    LandTek Group, Inc.                 
                                                            GC-006          5,462                  04/16/16   05/04/16    LandTek Group, Inc.                 
                                                            GC-007         18,000                  04/16/16   05/04/16    LandTek Group, Inc.                 
                                                            GC-008        -17,000                  06/30/17   07/14/17    LandTek Group, Inc.                 
                                                            MC-001          7,400                  04/22/16   05/04/16    Southeast Mechanical Corp.          
                                                            MC-001        -74,500                  06/30/17   07/05/17    Pearl River Plumbing Heating & Elect
                                                            MC-002       -321,250                  04/16/16   05/04/16    Southeast Mechanical Corp.          
                                                            MC-002         10,485                  06/30/17   07/05/17    Pearl River Plumbing Heating & Elect
                                                            MC-003         14,668                  04/16/16   05/04/16    Southeast Mechanical Corp.          
                                                            MC-003          4,205                  06/30/17   07/05/17    Pearl River Plumbing Heating & Elect
                                                            MC-004         33,676                  04/16/16   05/04/16    Southeast Mechanical Corp.          
                                                            MC-005         44,996                  04/16/16   05/04/16    Southeast Mechanical Corp.          
                                                            MC-006          6,033                  04/16/16   05/04/16    Southeast Mechanical Corp.          
                                                            MC-007          3,724                  04/16/16   05/04/16    Southeast Mechanical Corp.          
                                                            PC-001          7,478                  04/16/16   05/04/16    Mengler Mechanical Inc.             
                                                            PC-002          3,025                  04/16/16   05/04/16    Mengler Mechanical Inc.             
                                                            PC-003          2,178                  04/16/16   05/04/16    Mengler Mechanical Inc.             
 
14-0860   Reconstruction               0-003-020  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0991   Reconstruction               0-003-022  04/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0250   Reconstruction               0-003-023  09/20/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -7,440                  09/18/20   11/12/20    SPORT-TECH CONSTRUCTION CORP.       
                                                            002            -5,000                  09/18/20   11/12/20    SPORT-TECH CONSTRUCTION CORP.       
 
19-0317   Reconstruction               0-003-024  01/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01         -30,000                  02/15/22   02/16/23    Barrett Roofs Inc                   
 
19-1678   Reconstruction               0-003-025  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1933FC Reconstruction               0-003-027  05/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1226FP Reconstruction               0-003-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Kent Primary School:
94-1598   Reconstruction               0-004-004  06/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0673   Additions and Alterations    0-004-005  04/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              3,733                  12/04/08   01/26/09    AROW STEEL WINDOW CORP.             
                                                            EC-04           1,351                  05/17/05   06/14/05    Hudson Valley                       
                                                            GC-02          14,000                  09/29/04   10/04/04    Meyer Contracting                   
                                                            GC-22           1,299                  02/11/05   03/02/05    Meyer Contracting                   
                                                            GC-7           26,121                  09/29/04   10/04/04    Meyer Contracting                   
                                                            PC-01          -9,000                  09/29/04   10/14/04    S&L Plumbing                        
                                                            PC-05              50                  03/24/05   04/26/05    S and L Plumbing                    
                                                            SC-05           7,602                  02/11/05   06/30/05    Popoli Construction                 
                                                            WC-01          -7,500                  12/01/04   12/13/04    C/S Window Installers               
 
08-0504   Reconstruction               0-004-008  03/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          12,256                  09/09/10   09/28/10    NAPP ELECTRIC CONTRACTOR CO INC     
                                                            GC-001          8,208                  09/09/10   09/28/10    SISCA NORTHEAST                     
                                                            GC-002         10,472                  09/09/10   09/28/10    SISCA NORTHEAST                     
 
09-0939   Reconstruction               0-004-009  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0096   Reconstruction               0-004-010  03/09/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0623   Reconstruction               0-004-011  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0055   Reconstruction               0-004-012  01/07/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0861   Reconstruction               0-004-013  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1796   Reconstruction               0-004-014  06/28/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0318   Reconstruction               0-004-015  01/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0992   Reconstruction               0-004-016  04/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1679   Reconstruction               0-004-017  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1234FP Reconstruction               0-004-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Industrial Arts Bldg:
02-1062   Reconstruction               0-006-002  05/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0940   Reconstruction               0-006-004  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0862   Reconstruction               0-006-005  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1680   Reconstruction               0-006-006  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fine Arts Bldg:
02-1063   Reconstruction               0-007-002  05/19/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-02           3,500                  06/29/05   07/20/05    Leeds Industries Corp               
 
04-1284   Reconstruction               0-007-003  10/11/05  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0941   Reconstruction               0-007-004  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0863   Reconstruction               0-007-005  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1681   Reconstruction               0-007-006  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1075   Reconstruction               0-007-007  04/27/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,512                  02/15/22   02/16/23    Key Const Servs LLC                 
 

          George Fisher Middle School:
93-0774   Reconstruction               0-008-002  03/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0271   Reconstruction               0-008-003  10/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0156   Reconstruction               0-008-004  08/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1806   Reconstruction               0-008-006  07/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1356   Reconstruction               0-008-007  11/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           33,045                  09/15/09   08/06/10    RLJ Electric Company                
                                                            EC-2           11,566                  12/21/09   01/29/10    RLJ ELECTRIC CORPORATION            
                                                            GC-1                0                  01/20/09   03/09/09    Stratis Contracting Corporation     
                                                            GC-2                0                  09/15/09   08/10/10    STRATIS CONTRACTING CORPORATION     
                                                            GC-3                0                  10/13/09   06/29/10    STRATIS CONTRACTING CORPORATION     
                                                            GC-4                0                  10/27/09   01/13/10    STRATIS CONTRACTING CORPORATION     
                                                            GC-5          202,860                  10/27/09   01/13/10    STRATIS CONTRACTING CORPORATION     
                                                            GC-6            7,387                  12/21/09   01/29/10    STRATIS CONTRACTING CORPORATION     
                                                            GC-7                0                  03/15/10   05/24/10    STRATIS CONTRACTING CORPORATION     
                                                            GC-9          -40,670                  01/13/12   01/30/12    STRATIS CONTRACTING CORPORATION     
                                                            HC-1           35,040                  09/15/09   08/06/10    Mengler Mechanical Corporation      
                                                            HC-2           -1,927                  09/15/09   08/06/10    Mengler Mechanical Corporation      
                                                            PC-1            9,095                  09/15/09   08/06/10    Mengler Mechanical Corporation      
                                                            PC-2            2,286                  09/15/09   08/06/10    Mengler Mechanical Corporation      
                                                            PC-3           10,299                  12/21/09   01/29/10    Mengler Mechanical Corporation      
 
01-0703   Additions and Alterations    0-008-008  02/25/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0802   Reconstruction               0-008-009  05/20/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-35            6,570                  03/14/05   03/31/05    Meyer Contracting                   
                                                            EC-07           5,362                  06/09/05   07/20/05    Hudson Valley                       
                                                            EC-08             672                  06/09/05   07/20/05    Hudson Valley                       
                                                            EC-11           6,843                  05/25/06   07/31/06    Hudson Valley Electric              
                                                            GC-04          34,800                  09/29/04   12/24/04    Meyer Contracting                   
                                                            GC-13           5,317                  09/29/04   12/24/04    Meyer Contracting                   
                                                            GC-16             982                  10/05/04   10/18/04    Meyer Contracting                   
                                                            GC-18           4,851                  09/29/04   12/24/04    Meyer Contracting                   
                                                            GC-26          11,977                  02/24/05   03/23/05    meyer Contractig                    
                                                            GC-27           8,851                  02/24/05   03/23/05    meyer Contracting                   
                                                            GC-28          17,024                  02/24/05   03/23/05    meyer Contracting                   
                                                            GC-37          15,572                  05/17/05   07/13/05    Meyer Contracting                   
                                                            PC-08           7,658                  03/24/05   06/15/05    S and l Plumbing                    
                                                            PC-10           1,812                  06/22/05   07/11/05    Sand L Plumbing                     
                                                            SC-06          -5,000                  02/03/06   07/21/06    popoli Construction                 
                                                            SC-2            4,114                  01/20/05   03/17/05    Popoli Construction                 
 
08-0505   Reconstruction               0-008-012  03/06/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0627   Reconstruction               0-008-013  01/11/10  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0942   Reconstruction               0-008-014  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0624   Reconstruction               0-008-015  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0864   Reconstruction               0-008-016  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0319   Reconstruction               0-008-017  01/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-GF-01      -16,600                  10/19/20   02/16/21    NUA CONSTRUCTION CORP.              
 
20-0993   Reconstruction               0-008-018  04/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           9,442                  03/07/22   03/06/23    Vinco Builders LLC                  
                                                            MC-01         -15,537                  02/15/22   02/13/23    S&L Plumb&Heat Corp                 
 
19-1682   Reconstruction               0-008-019  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1227FP Reconstruction               0-008-FP1  06/10/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Matthew Paterson Elementary:
94-1599   Additions and Alterations    0-010-003  06/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0674   Additions and Alterations    0-010-004  04/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              1,551                  12/04/08   01/26/09    ARROW STEEL WINDOW CORP.            
                                                            EC-06           3,900                  06/09/05   06/30/05    Hudson Valley                       
                                                            GC-03          34,200                  09/29/04   10/04/04    Meyer Contracting                   
                                                            GC-10          10,418                  09/29/04   10/04/04    Meyer Contracting                   
                                                            GC-11           2,103                  09/29/04   10/04/04    Meyer Contracting                   
                                                            GC-25           4,874                  02/24/05     /  /      Meyer Contracting                   
                                                            PC-02          -9,000                  09/29/04   10/14/04    S&L Plumbing                        
                                                            PC-07             706                  03/24/05   04/26/05    S and L Plumbing                    
 
03-1594   Reconstruction               0-010-005  06/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0506   Reconstruction               0-010-007  03/06/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0943   Reconstruction               0-010-008  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0625   Reconstruction               0-010-009  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0865   Reconstruction               0-010-010  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0496   Reconstruction               0-010-011  04/03/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0320   Reconstruction               0-010-012  01/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-MP-01       -3,534                  10/19/20   02/16/21    NIKO K. CONSTRUCTION CORP.          
 
20-0994   Reconstruction               0-010-013  04/26/21  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1683   Reconstruction               0-010-014  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1235FP Reconstruction               0-010-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
97-1805   Reconstruction               1-002-004  07/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1091   Reconstruction               1-002-005  05/10/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0944   Reconstruction               1-002-006  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0626   Reconstruction               1-002-007  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0866   Reconstruction               1-002-008  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1684   Reconstruction               1-002-009  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Office:
97-1807   Reconstruction               1-013-001  07/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0867   Reconstruction               1-013-002  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1685   Reconstruction               1-013-003  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
97-1808   Reconstruction               5-005-005  07/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0945   Reconstruction               5-005-006  07/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0868   Reconstruction               5-005-007  11/03/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1686   Reconstruction               5-005-008  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand @ High School:
15-1213   New Construction             7-018-001  07/05/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001           -648                  12/22/17   02/09/18    Dant Clayton                        
 

          District-Wide:
08-1089   Reconstruction               7-999-002  03/25/09  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0388EP Energy Project               7-999-E01  11/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE

HALDANE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 48-04-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
96-1548   Reconstruction               0-001-006  05/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1284   Reconstruction               0-001-008  04/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2443   Additions and Alterations    0-001-009  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          26,507                  09/15/05   09/29/05    Netrix inc                          
                                                            AC-02           2,432                  09/15/05   09/29/05    Netrix inc                          
                                                            AC-03           7,139                  10/31/05   02/09/06    Netrix inc                          
                                                            AC-04          26,999                  10/31/05   11/08/05    Netrix Inc                          
                                                            AC-05           1,414                  10/31/05   02/09/06    netrix Inc                          
                                                            AC-06           7,702                  02/07/07   02/22/07    Netrix Inc                          
                                                            AC-07           9,401                  02/07/07   02/22/07    Netrix Inc                          
                                                            AC-08           1,204                  02/07/07   02/22/07    NETRIX, INC.                        
                                                            AC-09          -3,148                  02/07/07   02/22/07    Netrix Inc                          
                                                            GC-01          15,661                  09/15/05   09/29/05    Meyer Contracting Corp              
                                                            GC-02          17,629                  10/31/05   11/08/05    Meyer Contracting                   
                                                            GC-07          16,221                  10/31/05   11/08/05    Meyer Contracting                   
                                                            GC-16R         10,467                  02/28/08   04/14/08    MEYER CONTRACTING                   
                                                            GC-18R          1,418                  02/28/08   04/14/08    MEYER CONTRACTING CORPORATION       
                                                            GC-19R          6,200                  02/28/08   04/14/08    MEYER CONTRACTING CORPORATION       
                                                            Gc-11           1,353                  10/31/05   11/08/05    meyer Contracting corp              
                                                            Gc-13           3,148                  10/31/05   11/08/05    Meyer Contracting Corp              
                                                            Gc-14            -800                  10/31/05   11/08/05    Meyer contracting corp              
 
03-1482   Reconstruction               0-001-010  05/21/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          -7,000                  01/05/06   02/09/06    Precision Roofing                   
 
08-0212   Reconstruction               0-001-011  09/05/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1183   Reconstruction               0-001-012  03/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,481                  05/24/10   08/05/10    PLATO CONSTRUCTION CORP             
 
08-1639   Reconstruction               0-001-013  06/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,700                  10/28/09   12/22/09    SUPERIOR ABATEMENT INC              
 
10-0478   Reconstruction               0-001-014  02/22/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1134   Reconstruction               0-001-015  02/27/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0313   Reconstruction               0-001-016  11/13/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0669   Reconstruction               0-001-017  04/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,464                  12/16/15   01/08/16    Applied Landscape Technologies      
 
13-1445   Reconstruction               0-001-019  03/06/15  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0200   Reconstruction               0-001-021  10/10/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0488   Reconstruction               0-001-022  01/27/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1048   Reconstruction               0-001-023  04/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2195FP Reconstruction               0-001-FP1  08/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0058SC Visual Structural Inspection 0-001-SC1  08/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0446SC Visual Structural Inspection 0-001-SC2  10/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1647SC Visual Structural Inspection 0-001-SC3  05/28/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Merritt Building:
96-1547   Reconstruction               0-003-003  05/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0140   Reconstruction               0-003-004  10/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1285   Reconstruction               0-003-006  04/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0101   Reconstruction               0-003-007  07/26/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1135   Reconstruction               0-003-008  02/27/12  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2430   Reconstruction               0-003-009  10/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mfg.Classroom Bldg.@ Main Building:
99-0149   New Construction             0-007-001  10/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Manufactured Building #1:
10-1136   Reconstruction               0-008-003  02/27/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          New High School Annex:
02-2444   New Construction             0-016-001  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-06           5,735                  10/31/05   11/08/05    Meyer Contracting Corp              
                                                            GC-12           2,914                  10/31/05   11/08/05    Meyer Contracting                   
                                                            GC-15R         13,000                  02/28/08   04/14/08    MEYER CONTRACTING                   
                                                            GC-17R          4,900                  02/28/08   04/14/08    MEYER CONTRACTING CORPORATION       
                                                            GC-20R         12,849                  02/28/08   04/14/08    MEYER CONTRACTING                   
                                                            Gc-03           3,710                  10/31/05   11/08/05    Meyer Contracting Corp              
                                                            Gc-04           3,500                  10/31/05   02/09/06    Meyer Contracting corp              
                                                            Gc-05           4,093                  10/31/05   11/08/05    Meyer Contracting Corp              
                                                            Gc-08           5,065                  10/31/05   11/08/05    Meyer Contracting                   
                                                            Gc-09           3,965                  10/31/05   11/08/05    Meyer Contracting Corp              
                                                            Gc-10           6,900                  10/31/05   11/08/05    Meyer Contracting Corp              
                                                            MC-01           2,205                  02/26/07   03/07/07    J and m Heating And Air Cond        
                                                            MC-02           2,788                  02/26/07   03/07/07    J and M Heating Air Conditioning    
                                                            PC-01            -365                  02/26/07   03/07/07    Frank Lindy Plumbing                
 
10-1137   Reconstruction               0-016-002  02/27/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1447   Reconstruction               0-016-004  03/06/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0489   Reconstruction               0-016-006  01/27/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1049   Reconstruction               0-016-007  04/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0057SC Visual Structural Inspection 0-016-SC1  08/08/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage/Admin. Bldg.:
98-0141   Reconstruction               5-006-003  10/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1286   Reconstruction               5-006-006  04/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0102   Reconstruction               5-006-007  07/26/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1184   Reconstruction               5-006-008  03/11/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0479   Reconstruction               5-006-009  02/22/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1138   Reconstruction               5-006-010  02/27/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1446   Reconstruction               5-006-011  03/06/15  NO CHANGE ORDERS ON ELECTRONIC FILE

GARRISON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 48-04-04-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
95-0115   Reconstruction               0-001-002  08/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1607   Reconstruction               0-001-005  06/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0176   Reconstruction               0-001-006  09/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0186   Reconstruction               0-001-007  10/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0101   Reconstruction               0-001-008  09/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1306   Additions and Alterations    0-001-009  07/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0-7001          5,560           5,560    /  /     Disapproved Knight Flooring                     
                                                            00001          67,260                  04/09/04   12/28/04    JD Parrella                         
                                                            00001           1,200                  04/09/04   12/28/04    DKG Contract Flooring               
                                                            00001          55,000                  04/09/04   12/28/04    N Picco and Sons                    
                                                            01001         -16,000                  04/09/04   06/22/04    New Rochelle Contracting            
                                                            01002         -34,958                  11/15/02   01/08/03    New Rochelle Contracting            
                                                            01003          -2,000                  12/23/02   01/10/03    New Rochelle Contracting            
                                                            02001          26,200                  04/09/04   06/22/04    Schenectady Steel                   
                                                            02002             391                  04/09/04   04/14/04    Schenectady Steel                   
                                                            02004           7,682                  04/09/04   04/14/04    Schenectady Steel                   
                                                            02005               0                  11/15/02   01/08/03    Schenectady Steel                   
                                                            03001          95,000                  05/07/02   05/20/02    Rok-Built Const.                    
                                                            03002           2,021                  05/07/02   05/20/02    Rok-Built Const.                    
                                                            03003          10,000                  05/07/02   05/20/02    Rok-Built Const.                    
                                                            03004           6,035                  05/07/02   05/20/02    Rok-Built Const.                    
                                                            03005          59,819                  05/07/02   05/20/02    Rok-Built Const.                    
                                                            03006          38,475                  08/02/02   08/16/02    Rok-Built Const.                    
                                                            03008          27,478                  04/09/04   02/04/05    Rok Built Const.                    
                                                            04001          10,556                  05/07/02   05/20/02    Giorgi Builders                     
                                                            05002           8,982                  04/09/04   04/14/04    N Picco and Sons                    
                                                            05005          50,000                  12/23/02   01/10/03    N Picco and Sons                    
                                                            08001          11,000                  04/09/04   05/27/04    Dutchess Mech.                      
                                                            08002          11,036                  04/09/04   05/27/04    Dutchess Mech.                      
                                                            08003          -3,859                  08/02/02   08/16/02    Dutchess Mech.                      
                                                            09001          46,000                  03/20/02   05/20/02    Clean Air Quality                   
                                                            09002            -960                  05/07/02   04/01/04    Clean Air Quality                   
                                                            09003           5,068                  04/09/04   04/27/04    Clean Air Quality                   
                                                            09004          -1,400                  05/07/02   05/20/02    Clean Air Quality                   
                                                            09006           3,782                  05/07/02   05/20/02    Clean Air Quality                   
                                                            09007           3,300                  05/07/02   05/20/02    Clean Air Quality                   
                                                            09008           9,963                  05/07/02   05/20/02    Clean Air Quality                   
                                                            09009           6,125                  04/09/04   05/27/04    Clean Air Quality                   
                                                            10-002         27,400                  05/07/02   05/20/02    JD Parrella                         
                                                            10-003          5,662                  10/02/02   10/30/02    JD Parrella                         
 
99-1254   Reconstruction               0-001-011  04/29/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1974   Reconstruction               0-001-012  10/01/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2165   Reconstruction               0-001-013  07/29/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SPR-001        -4,900                  07/01/09   08/18/09    HYGRADE INSULATORS INC              
                                                            SR-001         -2,250                  07/01/09   08/18/09    PUFF INC                            
 
11-0640   Reconstruction               0-001-014  06/13/12  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1034   Reconstruction               0-001-015  04/21/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            013            31,310                  10/31/22   11/15/23    Hudson Val Elec Const Mngmnt Inc    
                                                            040           -14,097                  10/31/22   12/13/23    Meyer Contr Corp                    
                                                            EC-01           6,914                  12/16/21   09/27/22    Hudson Valley Elec Const Mang Inc   
                                                            EC-02          59,889                  02/10/22   11/17/22    Hudson Val Elec Const Mangt Inc     
                                                            EC-03           3,372                  02/10/22   11/17/22    Hudson Val Elec Const Mangt Inc     
                                                            EC-04           4,658                  02/10/22   11/17/22    Hudson Val Elec Const Mangt Inc     
                                                            EC-05           4,057                  02/10/22   11/17/22    Hudson Val Elec Const Mangt Inc     
                                                            EC-06           3,858                  02/10/22   11/17/22    Hudson Val Elec Const Mangt Inc     
                                                            EC-07           2,544                  06/22/22   04/27/23    Hudson Valley Elec Const Mangment   
                                                            EC-08           2,393                  06/22/22   04/27/23    Hud Val Elec Const Mangt Inc        
                                                            EC-09           2,249                  06/22/22   04/27/23    Hud Val Elec Const Mangmt Inc       
                                                            EC-10          65,476                  06/22/22   04/27/23    Hud Val Elec Const Mangmt Inc       
                                                            EC-11           5,230                  09/02/22   04/20/23    Hudson Valley Elec Const Manage Inc 
                                                            EC-12           2,390                  09/02/22   04/20/23    Hudson Val Elec Const Mangmt Inc    
                                                            GC-01          38,844                  10/01/21   12/01/22    Meyer Contracting Corp.             
                                                            GC-02          28,144                  10/01/21   12/01/22    Meyer Contracting Corp              
                                                            GC-03           7,782                  11/24/21   12/20/22    Meyer Contr Corp                    
                                                            GC-04           6,874                  11/24/21   12/20/22    Meyer Contr Corp                    
                                                            GC-042        -24,353                  10/31/22   12/13/23    Meyer Contrg Corp                   
                                                            GC-043         15,881                  10/31/22   12/13/23    Meyer Contr Corp                    
                                                            GC-044         10,879                  10/31/22   12/13/23    Meyer Contr Corp                    
                                                            GC-05           7,818                  11/24/21   12/20/22    Meyer Contr Corp                    
                                                            GC-06          14,256                  11/24/21   12/20/22    Meyer Contr Corp                    
                                                            GC-07           3,164                  11/24/21   12/20/22    Meyer Contr Corp                    
                                                            GC-08           8,581                  11/24/21   12/20/22    Meyer Contr Corp                    
                                                            GC-09           8,784                  11/24/21   12/20/22    Meyer Contr Corp                    
                                                            GC-10          16,996                  12/15/21   10/11/22    Meyer Contr Corp                    
                                                            GC-11          17,562                  12/20/21   01/24/23    Meyer Contr Corp                    
                                                            GC-12           9,562                  12/20/21   01/24/23    Meyer Contr Corp                    
                                                            GC-13           8,197                  12/20/21   01/24/23    Meyer Contr Corp                    
                                                            GC-14           9,421                  12/20/21   01/24/23    Meyer Contr Corp                    
                                                            GC-15           4,096                  12/20/21   01/24/23    Meyer Contr Corp                    
                                                            GC-17           5,516                  12/20/21   01/24/23    Meyer Contr Corp                    
                                                            GC-17           7,346                  12/20/21   01/24/23    Meyer Contr Corp                    
                                                            GC-18           6,355                  02/16/22   02/16/23    Meyer Contring Corp                 
                                                            GC-19           6,617                  02/16/22   02/16/23    Meyer Contr Corp                    
                                                            GC-20           5,575                  04/07/22     /  /      Meyer Contr Corp                    
                                                            GC-21           4,677                  04/07/22   02/08/23    Meyer Contr Corp                    
                                                            GC-22           6,965                  04/07/22   02/08/23    Meyer Contr Corp                    
                                                            GC-23           3,800                  04/07/22   02/08/23    Meyer Contr Corp                    
                                                            GC-24          18,863                  04/07/22   02/08/23    Meyer Contr Corp                    
                                                            GC-25           2,916                  04/07/22   02/08/23    Meyer Contr Corp                    
                                                            GC-26           9,595                  04/07/22   02/08/23    Meyer Contr Corp                    
                                                            GC-27          12,274                  04/07/22   02/08/23    Meyer Contr Corp                    
                                                            GC-28           5,907                  06/22/22     /  /      Meyer Contrg Corp                   
                                                            GC-29          13,099                  06/22/22     /  /      Meyer Contrg Corp                   
                                                            GC-30           4,997                  06/22/22     /  /      Meyer Contr Corp                    
                                                            GC-31          11,800                  06/22/22     /  /      Meyer Contr Corp                    
                                                            GC-32          18,992                  06/22/22     /  /      Meyer Contr Corp                    
                                                            GC-34           1,988                  09/02/22   08/22/23    Meyer Contrg Corp                   
                                                            GC-35          11,194                  09/02/22   08/22/23    Meyer Contr Corp                    
                                                            GC-36           4,109                  09/02/22   08/22/23    Meyer Contr Corp                    
                                                            GC-37           2,000                  09/02/22   08/22/23    Meyer Contr Corp                    
                                                            GC-38           3,928                  09/02/22   08/22/23    Meyer Contr Corp                    
                                                            GC-39           1,101                  09/02/22   08/22/23    Meyer Contrg Corp                   
                                                            GC-41         -26,785                  10/31/22   12/13/23    Meyer Contrg Corp                   
                                                            MC-01           5,604                  12/23/21   10/25/22    Bertussi Contr Inc                  
                                                            MC-02           1,435                  12/23/21   10/25/22    Bertussi Contr Inc                  
                                                            MC-03           4,478                  12/23/21   10/25/22    Bertussi Contr Inc                  
                                                            MC-04           5,575                  04/07/22   03/07/23    Bertussi Contr Inc                  
                                                            MC-05           4,855                  04/07/22   03/07/23    BERUSSI CONTRACTING                 
                                                            MC-06           5,556                  06/22/22   04/27/23    Bertussi Contrg Inc                 
                                                            MC-07           4,854                  09/02/22   04/20/23    Bertussi Contr Inc                  
                                                            MC-08           9,823                  10/31/22   11/15/23    Bertussi Contrg Inc                 
                                                            PC-03           5,131                  06/22/22   04/27/23    Total Const Corp                    
                                                            PC-04           9,170                  06/22/22   04/27/23    Total Const Group                   
                                                            PC-05           8,960                  09/02/22   04/20/23    Total Const Corp                    
                                                            PC-06          14,598                  06/15/23   12/29/23    TOTAL CONSTRUCTION                  
                                                            PC-07           2,065                  06/15/23   12/29/23    TOTAL CONSTRUCTION CORP             
 
21-0899   Reconstruction               0-001-016  10/11/21  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0879SC Visual Structural Inspection 0-001-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mod. Clsrm. #2:
99-0280   New Construction             0-005-001  10/18/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Storage Building:
11-0179   New Construction             2-008-001  11/14/11  NO CHANGE ORDERS ON ELECTRONIC FILE

PUTNAM VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 48-05-03-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Elementary School:
97-1070   Reconstruction               0-001-003  06/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0691   Reconstruction               0-001-006  03/09/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,250                  07/05/05   08/25/05    Anderson Electric                   
                                                            001            66,500                  07/05/05   07/29/05    Rok-Built Construction              
                                                            001           244,000                  07/05/05   07/29/05    hiTech Contracting Leed Industries  
                                                            001            12,150                  07/07/05   07/29/05    Beneway Inc                         
                                                            001            53,500                  12/06/05   01/17/06    Megler Mechanical Inc               
                                                            002             3,868                  08/08/05   08/12/05    Anderson Electric                   
                                                            002            11,520                  08/23/05   12/21/07    Beneway Inc                         
                                                            002            19,900                  08/23/05   08/25/05    Rok-Built Construction              
                                                            002             9,400                  01/09/06   06/26/06    Hi Tech Contracting Leed industries 
                                                            003             1,619                  08/23/05   08/25/05    Beneway Inc                         
                                                            003             3,573                  08/23/05   09/02/05    Anderson Electric                   
                                                            003             2,256                  09/16/05   09/29/05    Rok-built Construction              
                                                            003             1,728                  01/09/06   06/26/06    hi Tech Contracting Leed industries 
                                                            004             2,488                  08/23/05   08/25/05    Beneway inc                         
                                                            004             2,967                  09/16/05   09/29/05    Anderson electric                   
                                                            004               965                  09/16/05   09/30/05    Rok-Built Construction              
                                                            004             7,370                  08/21/06   09/06/06    Mengler Mechanical                  
                                                            005               203                  09/16/05   09/29/05    beneway Inc                         
                                                            005             9,900                  10/27/05   11/08/05    Rok-Built Construction              
                                                            005            11,000                  10/27/05   11/01/05    Anderson Electric                   
                                                            006               945                  09/16/05   09/29/05    Beneway Inc                         
                                                            006            12,400                  10/27/05   11/01/05    Anderson Electric                   
                                                            006             9,441                  10/27/05   04/24/06    Rok-Built Construction              
                                                            007             6,036                  10/27/05   11/01/05    Anderson electric                   
                                                            007             8,310                  10/27/05   11/08/05    Rok-Built Construction              
                                                            007             1,179               9  11/07/05   12/07/05    Beneway Inc                         
                                                            008             3,607                  10/27/05   11/01/05    anderson electric                   
                                                            008             4,520                  01/09/06   04/20/06    Beneway inc                         
                                                            009             8,196                  10/27/05   11/01/05    anderson Electric Inc               
                                                            009             9,692                  10/27/05   11/08/05    Rok-Built Construction              
                                                            009             2,821                  02/06/06   05/09/06    Beneway                             
                                                            010             4,381                  10/27/05   11/08/05    Rok-Built construction              
                                                            010             8,859                  01/09/06   04/20/06    Anderson Electric                   
                                                            011             4,249                  10/27/05   11/08/05    Rok-Built Construction              
                                                            011             7,170                  01/09/05   04/20/06    Anderson Electric                   
                                                            012            11,465                  11/07/05   12/06/05    Rok-Built Construction              
                                                            012             6,231                  01/09/06   04/20/06    Anderson electric                   
                                                            013             2,727                  01/09/06   06/26/06    Rok-built Construction              
                                                            013             1,839                  11/30/06   01/09/07    Anderson Electric                   
                                                            014             3,493                  01/09/06   06/26/06    Rok-Built Construction              
                                                            014             2,752                  11/30/06   01/09/07    Anderson Electric                   
                                                            015             8,586                  01/26/06   06/13/06    Rok-Built Construction              
                                                            015             4,361                  11/30/06   01/09/07    Anderson Electric                   
                                                            016             6,482                  01/26/06   06/13/06    Rok-Built Construction              
                                                            016             2,953                  11/30/06   01/09/07    Anderson Electric                   
                                                            017             7,585                  01/26/06   06/13/06    Rok-built Construction              
                                                            018             6,903                  06/20/06   08/11/06    Rok-built Construction              
                                                            019             7,794                  05/23/06   07/13/06    Rok-built Construction              
                                                            021             9,900                  05/23/06   06/21/06    Rok-built Construction              
                                                            023             4,701                  06/20/06   08/11/06    Rok-built Construction              
                                                            024             7,794                  05/20/06   08/11/06    Rok-built Construction              
                                                            08              9,047                  10/27/05   11/08/05    Rok-Built Construction              
                                                            10              4,366                  05/23/06   11/22/06    Beneway Inc                         
                                                            2               4,070                  08/21/06   09/06/06    Mengler Mechanical                  
                                                            20              8,482                  05/23/06   06/21/06    Rok built Construction              
                                                            22              3,829                  05/23/06   06/21/06    Rok-built Construction              
                                                            25              2,071                  05/20/06   08/11/06    Rok-Built Construction              
                                                            26             25,076                  11/30/06   01/09/07    Rok-Built Construction              
                                                            3               3,800                  08/21/06   09/06/06    Mengler Mechanical                  
                                                            5              11,721                  08/21/06   09/06/06    Mengler Mechanical                  
 
07-0392   Additions and Alterations    0-001-007  02/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,502                  06/13/11   06/20/11    DUTCHESS MECHANICAL, INC.           
                                                            001             9,178                  08/25/08   06/18/09    All Bright Electric, Inc.           
                                                            001             9,850                  09/15/08   04/07/09    DUNCAN INDUSTERIES CORP.            
                                                            001            -8,175                  05/26/11   06/08/11    ALL BRIGHT ELECTRIC                 
                                                            001             2,187                  06/13/11   06/20/11    RM CONTRACTING SERVICES INC         
                                                            002            16,830                  09/15/08   10/21/08    RM CONTRACTING SERVICES, INC.       
                                                            002             2,135                  10/08/08   05/01/09    ALL BRIGHT ELECTRIC, INC.           
                                                            002             4,555                  06/13/11   06/20/11    DUNCAN INDUSTERIES CORP.            
                                                            003            14,586                  09/19/08   11/06/08    RM CONTRACTING SERVICES, INC.       
                                                            004            -1,415                  10/08/08   03/19/09    RM CONTRACTING SERVICE, INC.        
                                                            004             3,083                  10/08/09   10/30/09    DUTCHESS MECHANICAL INC             
                                                            005             2,805                  10/08/08   03/19/09    RM CONTRACTING SERVICES, INC.       
                                                            005             2,945                  12/04/08   05/19/09    ALL BRIGHT ELECTRIC, INC.           
                                                            005             1,322                  03/02/09   04/13/09    ALL BRIGHT ELECTRIC, INC.           
                                                            006             9,015                  10/08/08   03/19/09    RM CONTRACTING SERVICES, INC.       
                                                            007             9,000                  12/23/08   05/04/09    RM CONTRACTING SERVICES             
                                                            008            62,607                  01/02/09   03/02/09    RM CONTRACTING SERVICES, INC.       
                                                            009            24,852                  01/02/09   02/27/09    RM CONTRACTING SERVICES, INC.       
                                                            010             3,199                  03/23/09   06/17/09    RM CONTRACTING SERVICES, INC.       
                                                            011             3,610                  01/08/10   03/04/10    ALL BRIGHT ELECTRIC                 
                                                            012             3,723                  03/25/09   06/15/09    RM CONTRACTING SERVICES             
                                                            013             5,834                  03/23/09   06/18/09    RM CONTRACTING SERVICES, INC.       
                                                            014             9,180                  03/23/09   06/18/09    RM CONTRACTING SERVICES, INC.       
                                                            019             4,863                  03/01/10   04/30/10    RM CONTRACTING SERVICES INC         
                                                            02              5,589                  10/08/08   03/19/09    DUTCHESS MECHANICAL                 
                                                            020             2,764                  03/01/10   04/30/10    RM CONTRACTING SERVICES INC         
                                                            03              2,773                  03/25/09   07/06/09    DUTCHESS MECHANICAL                 
                                                            03              2,635                  03/23/09   06/18/09    DUNCAN INDUSTRIES CORP.             
                                                            04              3,450                  02/23/09   04/23/09    ALL-BRIGHT ELECTRIC                 
                                                            04              1,460                  07/27/09   08/06/09    DUNCAN INDUSTRIES CORP              
                                                            06              3,582                  03/02/09   05/27/09    ALL BRIGHT ELECTRIC, INC.           
                                                            07              3,389                  03/02/09   05/27/09    ALL BRIGHT ELECTRIC, INC.           
                                                            08              3,360                  06/08/09   07/16/09    ALL BRIGHT ELECTRIC                 
                                                            09              1,212                  06/08/09   07/16/09    ALL BRIGHT ELECTRIC                 
                                                            10              2,846                  06/08/09   07/16/09    ALL BRIGHT ELECTRIC                 
                                                            11              6,379                  03/23/09   06/18/09    RM CONTRACTING SERVICES, INC.       
                                                            15              9,180                  04/24/09   07/29/09    RM CONTRACTING SERVICES INC         
                                                            16              9,180                  04/24/09   07/29/09    RM CONTRACTING SERVICES INC         
                                                            17              9,180                  04/24/09   07/29/09    RM CONTRACTING SERVICES INC         
                                                            18              9,180                  04/24/09   07/29/09    RM CONTRACTING SERVICES INC         
                                                            21             -4,710                  03/01/10   04/30/10    RM CONTRACTING SERVICES INC         
 
12-1099   Reconstruction               0-001-008  06/26/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1600   Reconstruction               0-001-009  12/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0671   Reconstruction               0-001-011  03/05/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-04          6,918                  03/15/21   05/13/21    PIEROTTI CORP.                      
                                                            EC2-01            740                  03/15/21   05/13/21    SOUTHEAST PLUMBING CORP.            
                                                            ES1-01          9,132                  09/21/20   11/10/20    PIEROTTI CORP.                      
                                                            ES1-02         -2,945                  09/21/20   11/10/20    PIEROTTI CORP.                      
                                                            ES1-03          4,158                  09/21/20   11/10/20    PIEROTTI CORP.                      
                                                            ES1-05          2,618                  01/28/21   03/19/21    PIEROTTI CORP.                      
                                                            ES3-01          4,100                  12/03/20   02/01/21    HRR INDUSTRIES, INC.                
                                                            ES4-01         12,531                  05/10/21   08/17/21    FOREMOST ELECTRIC CORP.             
 
21-1466   Reconstruction               0-001-012  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1681   Reconstruction               0-001-013  06/16/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          23,362                  06/20/23   12/22/23    PIEROTTI CORP                       
                                                            GC-02-ES        4,793                  07/31/23   12/27/23    PIEROTTI CORP                       
 
02-0475FP Reconstruction               0-001-FP1  04/09/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
97-1071   Reconstruction               0-004-004  06/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0874   Reconstruction               0-004-007  03/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0827   Reconstruction               0-004-008  04/29/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            25,740                  02/06/06   12/21/07    melwood Contracting                 
                                                            002             7,341                  02/06/06   01/16/08    Melwood Contracting                 
 
08-0674   Reconstruction               0-004-009  04/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,783                  08/27/09   09/16/09    ROK-BUILT CONSTRUCTION INC          
                                                            002             1,300                  10/27/09   11/23/09    ROK-BUILT CONSTRUCTION INC          
 
12-1100   Reconstruction               0-004-010  06/26/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0801   Reconstruction               0-004-011  12/29/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          6,552                  09/01/17   09/07/17    Foremost Electric Corporation       
                                                            GC-001          8,503                  08/17/15   09/01/15    Mengler Mechanical Inc.             
                                                            GC-002          7,708                  08/17/15   09/01/15    Mengler Mechanical Inc.             
                                                            GC-003          8,642                  10/05/15   11/17/15    Mengler Mechanical, Inc.            
 
15-0084   Reconstruction               0-004-012  07/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0426   Reconstruction               0-004-013  01/24/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1601   Reconstruction               0-004-014  12/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0672   Additions and Alterations    0-004-015  03/05/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3-05            2,883                  03/08/21   04/30/21    DJ HEATING & AIR CONDITIONING, INC. 
                                                            GC-01           8,694                  06/27/22   12/12/23    Pierotti Corp                       
                                                            MS1-01R         5,365                  07/14/20   09/08/20    PIEROTTI CORP.                      
                                                            MS1-02         31,929                  07/14/20   09/08/20    PIEROTTI CORP.                      
                                                            MS1-03         16,720                  07/14/20   09/08/20    PIEROTTI CORP.                      
                                                            MS1-04          8,702                  07/14/20   09/08/20    PIEROTTI CORP.                      
                                                            MS1-05          1,480                  07/14/20   09/08/20    PIEROTTI CORP.                      
                                                            MS1-06         10,817                  07/14/20   09/08/20    PIEROTTI CORP.                      
                                                            MS1-07          1,741                  07/14/20   09/04/20    PIEROTTI CORP.                      
                                                            MS1-08          3,031                  09/21/20   11/10/20    PIEROTTI CORP.                      
                                                            MS1-10         15,750                  09/21/20   11/09/20    PIEROTTI CORP.                      
                                                            MS1-11          9,226                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-12          2,322                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-13          1,745                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-14          4,905                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-15         17,345                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-16          2,044                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-17          1,716                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-18          1,309                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-19          9,453                  11/09/20   03/08/21    PIEROTTI CORP.                      
                                                            MS1-20          4,908                  01/15/21   03/29/21    PIEROTTI CORP.                      
                                                            MS1-21         24,817                  01/15/21   04/01/21    PIEROTTI CORP.                      
                                                            MS1-22          8,996                  01/28/21   03/19/21    PIEROTTI CORP.                      
                                                            MS1-30            893                  07/30/21   04/07/22    PIEROTTI CORP                       
                                                            MS2-01R        -6,427                  07/02/20   08/11/20    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MS2-02          2,090                  07/14/20   09/02/20    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MS2-03R         1,799                  10/07/20   12/03/20    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MS2-04          1,859                  01/28/21   03/25/21    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MS2-05          1,481                  01/28/21   03/25/21    CLEAN AIR QUALITY SERVICE, INC.     
                                                            MS3-01          8,476                  10/07/20   12/03/20    DJ HEATING & AIR CONDITIONING, INC. 
                                                            MS3-02         17,006                  09/21/20   11/25/20    DJ HEATING & AIR CONDITIONING, INC. 
                                                            MS3-03         -4,908                  12/03/20   02/01/21    DJ HEATING & AIR CONDITIONING, INC. 
                                                            MS3-04          5,313                  12/03/20   02/01/21    DJ HEATING & AIR CONDITIONING, INC. 
                                                            MS4-01          6,918                  01/15/21   03/17/21    RLJ ELECTRIC CORP.                  
                                                            MS4-02          5,234                  11/19/20   02/04/21    RLJ ELECTRIC CORP.                  
                                                            MS4-03          5,712                  11/19/20   02/04/21    RLJ ELECTRIC CORP.                  
                                                            MS4-04          8,908                  11/19/20   02/04/21    RLJ ELECTRIC CORP.                  
                                                            MS4-05          8,195                  11/09/20   01/27/21    RLJ ELECTRIC CORP.                  
                                                            MS4-06          2,604                  11/09/20   01/27/21    RLJ ELECTRIC CORP.                  
                                                            MS4-07          1,046                  01/28/21   03/25/21    RLJ ELECTRIC CORP.                  
                                                            MS4-08          3,197                  01/28/21   03/25/21    RLJ ELECTRIC CORP.                  
                                                            MS4-09        -16,825                  05/05/21   08/17/21    RLJ ELECTRIC CORP.                  
                                                            MS4-10         -4,678                  05/24/21   08/12/21    RLJ ELECTRIC CORPORATION            
                                                            MS5-01         22,051                  07/14/20   09/08/20    EMPIRE ENERGY SPECIALISTS, INC.     
                                                            MS5-02          1,977                  12/03/20   02/01/21    EMPIRE ENERGY SPECIALISTS, INC.     
                                                            MS6-01          9,134                  09/21/20   11/09/20    SINGER EQUIPMENT CO.,INC.           
 
20-1274   Reconstruction               0-004-016  03/30/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01R          8,694                  10/14/22   12/18/23    Pierotti Corp                       
                                                            GC-01R          8,694                  03/10/23     /  /      PIEROTTI CORP                       
                                                            GC-02         -47,600                  10/14/22     /  /      Pierotti Corp                       
                                                            GC-02         -47,600                  03/10/23   12/18/23    PIEROTTI CORP                       
 
02-0474FP Reconstruction               0-004-FP1  04/09/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Putnam Valley High School (new):
04-0439SC Visual Structural Inspection 0-006-SC1  11/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary (Modular):
92-1159   New Construction             0-007-001  05/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1682   Reconstruction               0-007-002  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Putnam Valley HS 2001 Gr9-12:
98-1285   New Construction             0-010-001  05/28/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-4           -5,498                  04/16/04   04/23/04    JD Parrella Elec.                   
                                                            H-1            -8,263                  04/16/04   04/23/04    Nationwide Mech.                    
                                                            PC-5            6,797                  11/08/04   01/03/05    LJ Coppola Inc                      
 
00-1400   Reconstruction               0-010-002  10/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1101   Reconstruction               0-010-003  05/23/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  09/09/13   09/19/13    The LandTek Group, Inc.             
                                                            002            52,900                  09/09/13   09/20/13    THE LANDTEK GROUP INC               
                                                            003            12,843                  11/18/13   12/05/13    The LandTek Group, Inc.             
 
16-1602   Reconstruction               0-010-004  12/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0673   Reconstruction               0-010-005  03/05/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HS1-09        -11,213                  09/21/20   11/09/20    PIEROTTI CORP.                      
                                                            HS1-23          4,085                  01/28/21   03/19/21    PIEROTTI CORP.                      
                                                            HS1-24          5,829                  01/28/21   03/19/21    PIEROTTI CORP.                      
                                                            HS1-25          1,743                  01/28/21   03/19/21    PIEROTTI CORP.                      
                                                            HS1-26          8,375                  04/13/21   06/23/21    PIEROTTI CORP.                      
                                                            HS1-27          5,047                  04/13/21   06/23/21    PIEROTTI CORP.                      
                                                            HS1-28         29,070                  07/30/21     /  /      PIEROTTI CORP                       
                                                            HS1-29          7,497                  07/30/21   04/07/22    PIEROTTI CORP                       
                                                            HS3-01          8,692                  07/14/20   09/02/20    J&M HEATING & AIR CONDITIONING, INC.
                                                            HS4-01         22,473                  09/21/20   11/25/20    RLJ ELECTRIC CORP.                  
                                                            HS4-02            947                  11/09/20   01/27/21    RLJ ELECTRIC CORP.                  
                                                            HS4-03          3,894                  01/15/21   03/17/21    RLJ ELECTRIC CORP.                  
                                                            HS4-04          2,203                  01/28/21   03/25/21    RLJ ELECTRIC CORP.                  
                                                            HS4-05          6,706                  04/13/21   07/15/21    RLJ ELECTRIC CORP.                  
                                                            HS4-06          1,910                  04/13/21   07/15/21    RLJ ELECTRIC CORP.                  
                                                            HS5-01R         3,150                  05/26/21   06/29/21    Joseph Lombardo Plumbing & Heating  
                                                            HS5-02          9,964                  12/28/20   03/02/21    JOSEPH LOMBARDO PLUMBING & HEATING  
                                                            HS5-03            789                  01/28/21   03/25/21    JOSEPH LOMBARDO PLUMBING,HEATING &  
 
21-1683   Reconstruction               0-010-006  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0123   Reconstruction               0-010-007  12/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Putnam Valley Transportation Garage:
09-0312   New Construction             5-012-001  01/12/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,161                  02/14/11   03/02/11    MARQUISE CONSTRUCTION CORP          
                                                            001             7,565                  03/18/11   08/15/11    ANDERSON ELECTRIC INC               
                                                            001             3,948                  07/11/11   08/16/11    FRANK & LINDY PLUMBING & HEATING INC
                                                            001               580                  09/28/11   12/22/11    SUN-DANCE ENERGY CONTRACTORS/MARKLEY
                                                            002             3,290                  03/14/11   06/24/11    MARQUISE CONSTRUCTION CORP          
                                                            002             2,736                  03/18/11   08/15/11    ANDERSON ELECTRIC INC               
                                                            002               792                  03/16/12   09/06/12    FRANK & LINDY PLUMBING & HEATING INC
                                                            003             2,220                  02/23/11   03/18/11    MARQUISE CONSTRUCTION CORP          
                                                            003             7,624                  04/12/11   06/16/11    ANDERSON ELECTRIC INC               
                                                            004            29,010                  03/24/11   06/10/11    MARQUISE CONSTRUCTION CORP          
                                                            005             7,316                  03/28/11   04/22/11    MARQUISE CONSTRUCTION CORP          
                                                            006            -1,058                  08/26/11   09/20/11    MARQUISE CONSTRUCTION CORP          
                                                            007             9,992                  05/31/11   07/15/11    MARQUISE CONSTRUCTION CORP          
                                                            008             2,811                  08/26/11   09/20/11    MARQUISE CONSTRUCTION CORP          
                                                            009             4,923                  08/26/11   09/20/11    MARQUISE CONSTRUCTION CORP          
                                                            010               665                  09/28/11   12/12/11    MARQUISE CONSTRUCTION CORP          
                                                            011               713                  09/21/11   11/23/11    MARQUISE CONSTRUCTION CORP          
                                                            012               800                  09/28/11   11/23/11    MARQUISE CONSTRUCTION CORP          
                                                            013             2,090                  09/21/11   11/23/11    MARQUISE CONSTRUCTION CORP          
 
16-1603   Reconstruction               5-012-002  12/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1684   Reconstruction               5-012-003  06/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Field House:
07-2045   New Construction             7-011-001  02/04/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC 01          -3,750                  03/16/17   05/16/17    Foremost Development LLC            
                                                            GC 02          -2,120                  03/16/17   05/16/17    Foremost Development LLC            
                                                            GC 03           3,960                  03/16/17   05/16/17    Foremost Development LLC            
 

BREWSTER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 48-06-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Henry Wells MS(plus CV STARR IS):
90-1889   Additions and Alterations    0-001-003  07/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1350   Additions and Alterations    0-001-005  07/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0804   Reconstruction               0-001-006  03/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1385   Reconstruction               0-001-008  07/01/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1782   Additions and Alterations    0-001-009  11/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ECB-10          3,200                  04/30/02   05/24/02    Avante Bldg. Const.                 
                                                            GC-18          17,449                  10/07/02   11/06/02    Glenman Industrial                  
                                                            GC-34           6,970                  01/08/03   02/12/03    Glenman Industrial                  
                                                            GC-35          -1,200                  01/08/03   02/12/03    Glenman Industrial                  
                                                            GC-5            1,789                  06/07/02   11/04/02    Glenman Industrial                  
                                                            PC-11           6,024                  12/17/02   01/09/03    Heritage Plumbing                   
                                                            SC-13           9,073                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-17           2,741                  12/22/02   01/09/03    The Losco Group                     
                                                            SC-18           4,887                  12/17/02   01/09/03    The Losco Group                     
 
99-1784   Reconstruction               0-001-010  11/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-41         -13,500                  02/27/03   03/06/03    Glenman Industrial                  
                                                            HCA-10          4,290                  06/07/02   11/04/02    J&M Heating                         
                                                            HCA-11         18,964                  06/07/02   11/04/02    J&M Heating                         
 
00-1645   Additions and Alterations    0-001-011  10/02/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            7,080                  03/25/03   04/17/03    Avanti Bldg. Const.                 
                                                            EC-1           -1,197                  09/18/03   09/23/03    Avanti Bldg. Const.                 
                                                            GC-1           11,850                  07/16/02   07/23/02    L Simon                             
                                                            GC-2           -7,605                  05/14/03   05/23/03    L Simon                             
                                                            GC-3           -3,000                  05/14/03   05/23/03    L Simon                             
                                                            HC-1           -4,000                  05/14/03   05/23/03    Keyspan Energy Solutions            
 
03-1037   Reconstruction               0-001-012  03/24/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               8,007                  11/10/04   12/27/05    Diggins mechanical Corp             
                                                            2              -1,110                  02/24/05   03/17/05    Diggins Mechanical Corp             
 
07-1748   Reconstruction               0-001-014  10/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-03           8,479                  07/02/09   08/31/09    CONSTRUCTION SERVICES LLC           
                                                            GC-04          22,767                  12/22/09   02/04/10    CONSTRUCTION SERVICES LLC           
 
04-0971   Reconstruction               0-001-015  03/30/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0014   Reconstruction               0-001-016  12/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0394   Reconstruction               0-001-017  12/11/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FA-01WEL      -17,538                  01/23/09   06/16/09    LIFE SAFETY ENGINEERED SYSTEMS      
 
09-0563   Reconstruction               0-001-019  12/17/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -3,000                  02/15/11   03/02/11    CALADRI DEVELOPMENT CORP            
 
09-1475   Additions and Alterations    0-001-020  09/27/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -12,000                  03/14/11   06/24/11    MEYER CONTRACTING                   
                                                            001            19,997                  04/12/11   06/16/11    HUDSON VALLEY ELEC CONST & MAINT INC
                                                            001            28,583                  07/20/11   08/05/11    JNS HEATING SERVICE INC             
                                                            001             6,667                  08/23/11   12/29/11    MENGLER MECHANICAL INC              
                                                            002             2,006                  03/14/11   06/24/11    MEYER CONTRACTING                   
                                                            002            53,890                  07/20/11   08/05/11    HUDSON VALLEY EC&M INC              
                                                            002            20,735                  11/22/11   07/16/12    JNS HEATING SERVICE INC             
                                                            002             2,124                  03/23/12   09/07/12    MENGLER MECHANICAL INC              
                                                            003             3,288                  03/14/11   06/24/11    MEYER CONTRACTING                   
                                                            003             5,808                  07/20/11   08/05/11    HUDSON VALLEY EC&M INC              
                                                            003            14,948                  04/17/12   09/07/12    MENGLER MECHANICAL INC              
                                                            003               526                  06/27/13   08/15/13    JNS HEATING SERVICE INC             
                                                            004            14,035                  04/12/11   06/16/11    MEYER CONTRACTING                   
                                                            004             2,145                  12/21/11   07/16/12    HUDSON VALLEY EC&M INC              
                                                            004            12,880                  05/01/12   09/07/12    MENGLER MECHANICAL INC              
                                                            005             6,000                  04/29/11   05/24/11    MEYER CONTRACTING                   
                                                            005            29,566                  12/21/11   07/16/12    HUDSON VALLEY EC&M INC              
                                                            006               373                  06/01/11   07/15/11    MEYER CONTRACTING                   
                                                            006               839                  01/19/12   07/16/12    HUDSON VALLEY ELECT CONST & MAINT   
                                                            007            14,700                  06/24/11   07/01/11    MEYER CONTRACTING                   
                                                            007            11,598                  01/19/12   07/16/12    HUDSON VALLEY EC&M INC              
                                                            008             6,227                  06/24/11   07/01/11    MEYER CONTRACTING                   
                                                            008             5,715                  01/19/12   07/16/12    HUDSON VALLEY EC&M INC              
                                                            009             7,500                  06/24/11   07/01/11    MEYER CONTRACTING                   
                                                            009             1,558                  01/19/12   07/16/12    HUDSON VALLEY EC&M INC              
                                                            010             1,570                  06/24/11   07/01/11    MEYER CONTRACTING                   
                                                            010               926                  01/19/12   07/16/12    HUDSON VALLEY EC&M INC              
                                                            011             1,671                  06/24/11   07/01/11    MEYER CONTRACTING                   
                                                            011             1,383                  03/23/12   09/07/12    HUDSON VALLEY EC&M INC              
                                                            012             3,701                  07/20/11   08/05/11    MEYER CONTRACTING                   
                                                            012             2,001                  03/23/12   09/07/12    HUDSON VALLEY EC&M INC              
                                                            013            -5,236                  07/20/11   08/05/11    MEYER CONTRACTING                   
                                                            013             2,170                  07/26/12   07/02/13    HUDSON VALLEY EC&M INC              
                                                            014            13,758                  08/23/11   09/07/11    MEYER CONTRACTING                   
                                                            014             2,603                  06/27/13   08/15/13    HUDSON VALLEY EC&M INC              
                                                            015            13,190                  09/21/11   11/23/11    MEYER CONTRACTING                   
                                                            015               680                  06/27/13   08/15/13    HUDSON VALLEY EC&M INC              
                                                            016             3,047                  09/21/11   11/23/11    MEYER CONTRACTING                   
                                                            016               824                  06/27/13   08/15/13    HUDSON VALLEY EC&M INC              
                                                            017             9,846                  09/21/11   11/23/11    MEYER CONTRACTING                   
                                                            017             6,519                  06/27/13   08/15/13    HUDSON VALLEY EC&M INC              
                                                            018             7,096                  09/21/11   11/23/11    MEYER CONTRACTING                   
                                                            018            18,883                  06/27/13   08/15/13    HUDSON VALLEY EC&M INC              
                                                            019            14,118                  09/21/11   11/23/11    MEYER CONTRACTING                   
                                                            019            -4,567                  06/27/13   08/15/13    HUDSON VALLEY EC&M INC              
                                                            020             7,429                  09/21/11   11/23/11    MEYER CONTRACTING                   
                                                            021             6,310                  11/22/11   02/03/12    MEYER CONTRACTING                   
                                                            022            15,638                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            023             2,976                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            024             1,160                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            025            20,995                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            026             2,248                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            027             5,644                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            028               655                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            029             2,844                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            030             4,955                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            031               738                  03/05/12   08/06/12    MEYER CONTRACTING                   
                                                            032             4,940                  03/05/12   08/06/12    MEYER CONTRACTING                   
                                                            033            14,990                  04/04/12   08/30/12    MEYER CONTRACTING                   
                                                            034            -4,051                  05/15/12   10/05/12    MEYER CONTRACTING                   
                                                            035            13,875                  05/15/12   10/05/12    MEYER CONTRACTING                   
                                                            036             1,783                  07/26/12   02/19/13    MEYER CONTRACTING                   
                                                            037             4,652                  05/15/12   10/05/12    MEYER CONTRACTING                   
                                                            038             3,349                  07/26/12   02/19/13    MEYER CONTRACTING                   
                                                            039             1,549                  07/26/12   02/19/13    MEYER CONTRACTING                   
                                                            040             2,287                  07/26/12   02/19/13    MEYER CONTRACTING                   
                                                            041               643                  07/26/12   02/19/13    MEYER CONTRACTING                   
                                                            042             4,513                  07/26/12   02/19/13    MEYER CONTRACTING                   
                                                            043             5,933                  07/26/12   02/19/13    MEYER CONTRACTING                   
                                                            044            11,176                  08/24/12   12/10/12    MEYER CONTRACTING                   
                                                            045             2,438                  08/24/12   12/10/12    MEYER CONTRACTING                   
                                                            046             2,115                  08/24/12   12/10/12    MEYER CONTRACTING                   
                                                            047             5,806                  08/24/12   12/10/12    MEYER CONTRACTING                   
                                                            048             2,739                  11/30/12   02/22/13    MEYER CONTRACTING                   
                                                            049            15,309                  06/27/13   08/09/13    MEYER CONTRACTING                   
                                                            050             8,773                  06/27/13   08/09/13    MEYER CONTRACTING                   
                                                            051             9,512                  06/27/13   08/09/13    MEYER CONTRACTING                   
                                                            052             5,706                  06/27/13   08/09/13    MEYER CONTRACTING                   
                                                            053             2,796                  06/27/13   08/09/13    MEYER CONTRACTING                   
                                                            054             5,851                  06/27/13   08/09/13    MEYER CONTRACTING                   
                                                            055            22,597                  06/27/13   08/09/13    MEYER CONTRACTING                   
 
10-0348   Reconstruction               0-001-021  04/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,381                  09/21/11   12/20/11    MEYER CONTRACTING                   
                                                            001             9,008                  01/19/12   04/12/12    MENGLER MECHANICAL INC              
                                                            001             5,200                  03/27/12   01/25/13    J&J SASS ELECTRIC INC               
                                                            001             8,216                  05/15/12   02/04/14    SOUTHEAST PLUMBING CORPORATION      
                                                            002             3,607                  09/21/11   12/20/11    MEYER CONTRACTING                   
                                                            002             3,832                  03/23/12   01/25/13    MENGLER MECHANICAL INC              
                                                            002             5,763                  06/19/12   02/04/14    K & J Sass Electric, Inc.           
                                                            002             3,677                  08/24/12   12/07/12    SOUTHEAST PLUMBING CORPORATION      
                                                            003             2,511                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            003               582                  06/19/12   11/21/12    J & J Sass Electric, Inc.           
                                                            003               880                  08/24/12   12/07/12    SOUTHEAST PLUMBING CORPORATION      
                                                            004             3,614                  01/19/12   04/06/12    MEYER CONTRACTING                   
                                                            004             3,056                  08/24/12   12/07/12    J&J SASS ELECTRIC INC               
                                                            004             5,427                  11/30/12   08/12/13    Southeast Plumbing Corporation      
                                                            004            -1,363                  06/27/13   08/06/13    MENGLER MECHANICAL INC              
                                                            005           233,000                  02/07/12   05/16/12    MEYER CONTRACTING                   
                                                            005             2,437                  08/24/12   12/07/12    J&J SASS ELECTRIC INC               
                                                            005             2,273                  06/27/13   08/06/13    SOUTHEAST PLUMBING CORPORATION      
                                                            005             4,534                  06/27/13   10/25/13    MENGLER MECHANICAL INC              
                                                            006            -1,574                  03/23/12   08/31/12    MEYER CONTRACTING                   
                                                            006            21,363                  06/27/13   10/25/13    J&J SASS ELECTRIC INC               
                                                            006             2,660                  06/27/13   08/06/13    MENGLER MECHANICAL INC              
                                                            007             2,707                  04/04/12   08/31/12    MEYER CONTRACTING                   
                                                            007             2,248                  06/27/13   08/06/13    J&J SASS ELECTRIC INC               
                                                            008            43,165                  03/27/12   08/31/12    MEYER CONTRACTING                   
                                                            009            16,335                  03/27/12   08/31/12    MEYER CONTRACTING                   
                                                            010               642                  05/15/12   10/23/12    MEYER CONTRACTING                   
                                                            011            10,279                  05/15/12   10/23/12    MEYER CONTRACTING                   
                                                            012            17,052                  05/15/12   10/23/12    MEYER CONTRACTING                   
                                                            013             8,035                  05/15/12   10/23/12    MEYER CONTRACTING                   
                                                            014             1,872                  07/26/12   01/24/13    MEYER CONTRACTING                   
                                                            015            11,953                  07/26/12   01/24/13    MEYER CONTRACTING                   
                                                            016            33,440                  07/26/12   01/24/13    MEYER CONTRACTING                   
                                                            017            75,782                  07/26/12   03/05/13    MEYER CONTRACTING                   
                                                            018                 0                  08/24/12   12/07/12    MEYER CONTRACTING                   
                                                            019            15,000                  10/04/12   02/22/13    MEYER CONTRACTING                   
                                                            020             6,295                  10/04/12   02/22/13    MEYER CONTRACTING                   
                                                            021             9,921                  10/04/12   02/22/13    MEYER CONTRACTING                   
                                                            022             5,141                  10/04/12   02/22/13    MEYER CONTRACTING                   
                                                            023             1,363                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            024             3,467                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            025             6,601                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            026            20,718                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            029            20,264                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            030             1,053                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            031                 0                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            033             1,472                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            034             1,961                  06/27/13   07/26/13    MEYER CONTRACTING                   
                                                            036           -10,567                  06/27/13   07/26/13    MEYER CONTRACTING                   
 
12-0144   Reconstruction               0-001-022  01/03/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1266   Reconstruction               0-001-023  03/25/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -4,395                  10/26/15   01/22/16    WB Contracting Corp.                
 
15-0367   Reconstruction               0-001-024  03/29/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         23,740                  11/23/16   02/06/17    Filingeri Electrical Contracting    
                                                            EC-002          1,735                  11/23/16   02/06/17    geri Electrical Contracting Corp    
                                                            EC-003          3,864                  03/01/17   06/18/19    Filingeri Electrical Contracting Cor
                                                            EC-004          5,102                  10/01/19   10/01/19    FILINGERI ELECTRICAL CONTRACTING,INC
                                                            GC-001         16,855                  11/23/16   12/12/16    Nurzia Construction Company         
                                                            GC-002          2,572                  11/23/16   12/12/16    Nurzia Construction Corp            
                                                            GC-003         10,419                  03/01/17   07/14/17    Nurzia Construction Corporation     
                                                            GC-004          5,068                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-005         14,552                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-006         25,818                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-007         32,350                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-008          2,841                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-009            803                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-010          6,318                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-011         18,707                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-012         29,250                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-013         22,727                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            GC-014         23,517                  11/14/17   02/14/18    Nurzia Construction Corporation     
                                                            MC-001          2,477                  10/01/19   10/01/19    SOUTHEAST MECHANICAL CORP.          
                                                            MC-002         12,574                  10/01/19   10/01/19    SOUTHEAST MECHANICAL CORP.          
                                                            MC-003          5,425                  10/01/19   10/01/19    SOUTHEAST MECHANICAL CORP.          
                                                            MC-004          1,190                  10/01/19   10/01/19    SOUTHEAST MECHANICAL CORP.          
                                                            PC-001          4,680                  10/01/19   10/01/19    SOUTHEAST PLUMBING CORP.            
                                                            PC-002          1,266                  10/01/19   10/01/19    SOUTHEAST PLUMBING CORP.            
                                                            PC-003          1,091                  10/01/19   10/01/19    SOUTHEAST PLUMBING CORP.            
 
18-1745   Reconstruction               0-001-025  08/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GCF-001        60,000                  10/01/19   10/04/19    SPORT-TECH CONSTRUCTION CORP.       
                                                            GCF-002       -20,000                  11/05/20   03/08/21    SPORT-TECH CONSTRUCTION CORP.       
 
05-0356SC Visual Structural Inspection 0-001-SC1  11/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0178SC Visual Structural Inspection 0-001-SC2  09/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0184SC Visual Structural Inspection 0-001-SC3  08/17/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXGarden Street School(sold 02/2020):
99-1785   Reconstruction               0-002-004  11/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ECB-1           8,321                  03/29/02   05/23/02    Avanti Bldg. Const.                 
                                                            ECB-11            277                  12/17/02   11/18/03    Avanti Bldg. Const.                 
                                                            ECB-13          3,798                  03/11/03   03/24/03    Avanti Bldg. Const.                 
                                                            ECB-15         -2,223                  03/20/03   03/24/03    Avanti Bldg. Const.                 
                                                            ECB-16          3,541                  09/18/03   11/18/03    Avanti Bldg. Const.                 
                                                            ECB-4           1,397                  04/22/02   05/30/02    Avanti Bldg. Const.                 
                                                            ECB-8           2,931                  04/30/02   05/24/02    Avanti Bldg. Const.                 
                                                            GC-42          -8,000                  02/27/03   03/06/03    Glenman Industrial                  
                                                            GC-45           8,148                  05/06/03   05/07/03    Glenman Industrial                  
                                                            HCA-03         98,380                  03/08/02     /  /      J&M Heating                         
                                                            HCA-04        145,579                  03/08/02     /  /      J&M Heating                         
                                                            HCA-05         -4,000                  03/08/02   10/23/03    J&M Heating                         
                                                            HCA-06        188,305                  03/08/02     /  /      J&M Heating                         
                                                            HCA-07         58,075                  03/08/02     /  /      J&M Heating                         
                                                            HCA-08         57,066                  03/11/02     /  /      J&M Heating                         
                                                            HCA-09        192,700                  03/11/02     /  /      J&M Heating                         
                                                            PC-1           21,871                  08/17/01   01/14/03    Heritage Plumbing                   
                                                            PC-3           20,882                  05/09/02   05/14/02    Heritage Plumbing                   
                                                            SC-3            2,487                  06/20/02   07/05/02    The Losco Group                     
 
03-1038   Reconstruction               0-002-005  03/24/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,760                  11/10/04   12/23/05    Sausto Contracting                  
 
07-1749   Reconstruction               0-002-007  10/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-01R        10,200                  01/08/10   02/25/10    EXCEL INSULATION CO INC             
                                                            EC-01R         -7,710                  06/16/10   08/04/10    PANTEL CONTRACTING CORP             
                                                            GC-05           3,084                  12/22/09   02/04/10    CONSTRUCTION SERVICES LLC           
                                                            GC-06R          9,653                  08/27/10   09/24/10    CONSTRUCTION SERVICES LLC           
                                                            HVAC-01R       -7,539                  06/16/10   08/04/10    J&M HEATING & AIR CONDITIONING      
                                                            HVAC-02       -15,000                  10/15/10   11/24/10    J&M HEATING & AIR CONDITIONING      
 
06-0015   Reconstruction               0-002-008  12/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0395   Reconstruction               0-002-009  12/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0176SC Visual Structural Inspection 0-002-SC1  09/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          John F. Kennedy Elementary School:
91-1474   Reconstruction               0-003-004  06/18/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1786   Reconstruction               0-003-005  11/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-1          36,807                  05/09/02   05/14/02    Niram, Inc                          
                                                            ASB-3           1,249                  07/03/02   07/09/02    Niram, Inc                          
                                                            ECB-11          3,607                  12/17/02   01/09/03    Avanti Bldg. Const.                 
                                                            ECB-12          9,314                  02/27/03   03/06/03    Avanti Bldg. Const.                 
                                                            ECB-14          3,033                  03/20/03   03/24/03    Avanti Bldg. Const.                 
                                                            ECB-17           -400                  09/18/03   11/18/03    Avanti Bldg. Const.                 
                                                            ECB-2           4,789                  03/20/02   05/24/02    Avanti Bldg. Const.                 
                                                            ECB-3          21,999                  04/30/02   05/24/02    Avanti Bldg. Const.                 
                                                            ECB-5           9,779                  04/22/02   05/30/02    Avanti Bldg. Const.                 
                                                            ECB-6           2,021                  04/22/02   05/30/02    Avanti Bldg. Const.                 
                                                            ECB-7          14,353                  04/30/02   05/24/02    Avanti Bldg. Const.                 
                                                            ECB-9           5,782                  04/30/02   05/24/02    Avanti Bldg. Const.                 
                                                            GC-11          39,860                  07/03/02   07/09/02    Glenman Industrial                  
                                                            GC-31           4,000                  12/17/02   01/09/03    Glenman Industrial                  
                                                            GC-4           15,503                  06/07/02   11/04/02    Glenman Industrial                  
                                                            GC-43          -9,000                  02/27/03   03/06/03    Glenman Industrial                  
                                                            HCB-03          2,174                  03/06/03   03/24/03    J&M Heating                         
                                                            HCB-04          1,692                  10/31/03   11/18/03    J&M Heating                         
                                                            PC-20           1,752                  02/27/03   03/06/03    Heritage Plumbing                   
                                                            Pav-1          62,485                  10/16/01   05/22/02    Paleen Const.                       
                                                            SC-10           5,995                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-25           9,574                  05/06/03   05/07/03    The Losco Group                     
 
06-0016   Reconstruction               0-003-008  12/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1750   Reconstruction               0-003-009  10/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02           1,826                  07/02/09   08/31/09    CONSTRUCTION SERVICES LLC           
 
15-0399   Reconstruction               0-003-010  05/20/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ACM-001        24,512                  09/08/16   10/25/16    A-Tech Group, LLC                   
                                                            ACM-002        58,163                  09/08/16   10/25/16    A-Tech Group, LLC                   
                                                            ACM-003        13,794                  09/08/16   10/25/16    A-Tech Group, LLC                   
                                                            ACM-004       -73,465                  10/01/19   10/07/19    A-TECH GROUP, LLC                   
                                                            EC-001            486                  03/01/17   04/13/17    J&J Sass Electric, Inc.             
                                                            EC-002          2,101                  03/01/17   04/13/17    J&J Sass Electric, Inc.             
                                                            EC-003          3,965                  06/16/17   07/14/17    J & J Sass Electric, Inc.           
                                                            EC-004         16,160                  06/16/17   07/14/17    J & J Sass Electric, Inc.           
                                                            EC-005         25,800                  07/26/17   09/06/17    J & J Sass Electric, Inc.           
                                                            EC-006         44,754                  07/26/17   09/06/17    J & J Sass Electric, Inc.           
                                                            EC-007          6,429                  07/26/17   09/06/17    J & J Sass Electric, Inc.           
                                                            EC-008          6,439                  07/26/17   09/06/17    J & J Sass Electric, Inc.           
                                                            EC-009          2,112                  07/26/17   09/06/17    J & J Sass Electric, Inc.           
                                                            EC-010          1,847                  07/26/17   09/06/17    J & J Sass Electric, Inc.           
                                                            EC-011          6,531                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-012          7,727                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-013          1,394                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-014          6,870                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-015         61,460                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-016          9,440                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-017          5,591                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-018         54,568                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            EC-019          5,532                  10/01/19   10/02/19    J&J SASS ELECTRIC, INC.             
                                                            GC-001         32,767                  11/23/16   12/27/16    Piazza, Inc                         
                                                            GC-002         24,000                  03/01/17   03/06/17    Piazza, Inc.                        
                                                            GC-003         18,896                  11/23/16   12/27/16    Piazza, Inc.                        
                                                            GC-004         41,000                  01/13/17   01/27/17    Piazza, Inc.                        
                                                            GC-005          2,748                  11/20/17   11/30/18    Piazza, Inc.                        
                                                            GC-006          6,308                  06/16/17   06/23/17    Piazza, Inc.                        
                                                            GC-007          2,192                  06/16/17   06/23/17    Piazza, Inc.                        
                                                            GC-008         -4,815                  06/16/17   06/23/17    Piazza, Inc.                        
                                                            GC-009         29,000                  06/16/17   06/23/17    Piazza, Inc.                        
                                                            GC-010          5,446                  06/16/17   06/23/17    Piazza, Inc.                        
                                                            GC-011          3,780                  06/16/17   06/23/17    Piazza, Inc.                        
                                                            GC-012          3,335                  11/20/17   11/30/18    Piazza, Inc.                        
                                                            GC-013          5,610                  06/16/17   06/23/17    Piazza, Inc.                        
                                                            GC-014            365                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-015         35,219                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-016         19,037                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-017         68,125          68,125  07/26/17   08/25/17    Piazza, Inc.                        
                                                            GC-018         13,665                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-019          7,693                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-020         48,897                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-021         75,946                  07/26/17   11/30/18    Piazza, Inc.                        
                                                            GC-022        -15,543                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-023          1,690                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-024          8,133                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-025            480                  07/26/17   07/28/17    Piazza, Inc.                        
                                                            GC-026         20,387                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-027       -198,960                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-028         -7,774                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-029          1,057                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-030         20,387                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-031         16,247                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-032          5,501                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-033         70,797                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-034         14,274                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-035          3,517                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-036          2,248                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-037         55,000                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-038        136,689                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-039         15,792                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-040         21,908                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-041          7,522                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-042         42,647                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-043          4,680                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-044         39,000                  12/18/17   02/13/18    Piazza, Inc.                        
                                                            GC-045        206,734                  11/14/17   11/30/18    Piazza, Inc.                        
                                                            GC-046         15,590                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-047         35,040                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-048         14,523                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-049          1,219                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-050         32,885                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-051          3,865                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-052          7,557                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-053          3,030                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-054        207,000                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-055        108,000                  11/14/17   12/04/17    Piazza, Inc.                        
                                                            GC-056        101,550                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-057         11,532                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-058         29,777                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-059         26,943                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-060         73,588                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-061         58,589                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-062         68,597                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-063         13,327                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-064         32,652                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-065         81,874                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-066        112,843                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-067          8,223                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-068          5,630                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-069          7,524                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-070          9,476                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-071          1,784                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-072         38,789                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-073         22,700                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-074         12,165                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-075          2,219                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-076         24,000                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-077          3,283                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-078          2,050                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-079          5,362                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-080          4,021                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-081         56,233                  10/01/19   11/22/19    PIAZZA, INC.                        
                                                            GC-082          5,630                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-083          8,900                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-084         28,202                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-085          9,000                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GC-086          2,933                  10/01/19   10/07/19    PIAZZA, INC.                        
                                                            GCP-001       340,000                  10/01/19   11/22/19    CONSORTI BROS. PAVING & SEALCOATING 
                                                            MC-001          4,994                  03/01/17   04/13/17    Pearl River Plumbing & Heating      
                                                            MC-002          3,366                  06/16/17   07/14/17    Pearl River Plumbing & Heating d/b/a
                                                            MC-003         48,742                  06/16/17   07/14/17    Pearl River Plumbing & Heating d/b/a
                                                            MC-004          5,934                  10/01/19   10/02/19    PEARL RIVER PLUMBING & HEATING      
                                                            MC-005          2,094                  10/01/19   10/02/19    PEARL RIVER PLUMBING & HEATING      
                                                            MC-006         11,936                  10/01/19   10/02/19    PEARL RIVER PLUMBING & HEATING      
                                                            MC-007         12,539                  10/01/19   10/02/19    PEARL RIVER PLUMBING & HEATING      
                                                            MC-008          6,682                  10/01/19   10/02/19    PEARL RIVER PLUMBING & HEATING      
                                                            MC-009         16,065                  10/01/19   10/02/19    PEARL RIVER PLUMBING & HEATING      
                                                            MC-010        -10,987                  10/01/19   10/02/19    PEARL RIVER PLUMBING & HEATING      
                                                            PC-001          1,955                  03/01/17   04/13/17    S&L Plumbing & Heating Corp.        
                                                            PC-002          1,915                  03/01/17   04/13/17    S&L Plumbing & Heating Corp.        
                                                            PC-003          3,608                  03/01/17   04/13/17    S&L Plumbing and Heating Corp.      
                                                            PC-004          6,365                  03/01/17   04/13/17    S&L Plumbing and Heating Corp.      
                                                            PC-005            707                  03/01/17   04/13/17    S&L Plumbing and Heating Corp.      
                                                            PC-006         29,246                  06/16/17   07/14/17    S & L Plumbing and Heating Corp.    
                                                            PC-007          2,972                  06/16/17   07/14/17    S & L Plumbing and Heating Corp.    
                                                            PC-008         98,000                  07/26/17   09/06/17    S & L Plumbing and Heating Corp.    
                                                            PC-009          2,914                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-010R         1,327                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-011            421                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-012          2,516                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-013          8,825                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-014         16,595                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-015            573                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-016         12,497                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-017          3,823                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-018          5,950                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
                                                            PC-019R        -8,204                  10/01/19   10/02/19    S&L PLUMBING & HEATING CORP.        
 
17-0317   Reconstruction               0-003-011  06/01/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1297   Reconstruction               0-003-012  02/27/20  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0358   Visual Structural Inspection 0-003-SC1  11/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Brewster High School:
93-1308   Reconstruction               0-004-004  05/11/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1279   Reconstruction               0-004-005  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1781   Additions and Alterations    0-004-007  11/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-2           3,500                  07/03/02   07/09/02    Niram                               
                                                            ASB-4          13,817                  08/26/02   11/01/02    Niram                               
                                                            ASB-5          18,500                  08/26/02   11/01/02    Niram                               
                                                            ASB-6          -3,375                  05/06/03   05/07/03    Niram                               
                                                            ASB-7          10,375                  05/06/03   05/07/03    Niram                               
                                                            C-4             9,859                  06/21/02   07/05/02    The Losco Group                     
                                                            C-6            24,758                  06/21/02   07/05/02    The Losco Group                     
                                                            CC-01             408                  06/02/03   06/04/03    LeClair Communications              
                                                            ECA-09          6,925                  12/17/02   01/02/03    All Bright Elec.                    
                                                            ECA-1           3,286                  06/07/02   11/04/02    All Bright Elec.                    
                                                            ECA-10            165                  12/17/02   01/02/03    All Bright Elec.                    
                                                            ECA-11         14,617                  12/24/02   01/09/03    All Bright Elec.                    
                                                            ECA-12         16,019                  12/17/02   01/02/03    All Bright Elec.                    
                                                            ECA-13          2,592                  12/17/02   01/02/03    All Bright Elec.                    
                                                            ECA-14          9,446                  02/12/03   02/27/03    All Bright Elec.                    
                                                            ECA-15         34,501                  08/01/03   08/15/03    All Bright Elec.                    
                                                            ECA-16         -3,124                  09/05/03   11/18/03    All Bright Elec.                    
                                                            ECA-2           5,001                  06/07/02   11/04/02    All Bright Elec.                    
                                                            ECA-3          -8,717                  06/07/02   11/04/02    All Bright Elec.                    
                                                            ECA-4           3,770                  06/07/02   11/04/02    All Bright Elec.                    
                                                            ECA-5          13,101                  06/07/02   11/04/02    All Bright Elec.                    
                                                            ECA-6           4,846                  06/07/02   11/04/02    All Bright Elec.                    
                                                            ECA-7           6,196                  06/07/02   11/04/02    All Bright Elec.                    
                                                            ECA-8          35,088                  12/17/02   01/02/03    All Bright Elec.                    
                                                            FSC-01         -9,464                  10/31/03   11/18/03    H. Weiss Equip.                     
                                                            FSC-02         -1,020                  05/14/03   05/21/03    H. Weiss Equip.                     
                                                            GC-10           2,942                  07/03/02   07/09/02    Glenman Industrial                  
                                                            GC-12          21,092                  07/03/02   07/09/02    Glenman Industrial                  
                                                            GC-13             406                  07/16/02   10/30/02    Glenman Industrial                  
                                                            GC-14           1,217                  08/26/02   11/01/02    Glenman Industrial                  
                                                            GC-15          11,039                  10/07/02   11/06/02    Glenman Industrial                  
                                                            GC-16           2,738                  10/07/02   11/06/02    Glenman Industrial                  
                                                            GC-17          18,000                  10/07/02   11/06/02    Glenman Industrial                  
                                                            GC-19          -1,334                  10/07/02   11/06/02    Glenman Industrial                  
                                                            GC-2           23,000                  03/22/02   05/06/02    Glenman Industrial                  
                                                            GC-20         -73,950                  10/15/02   11/06/02    Glenman Industrial                  
                                                            GC-21         -68,000                  10/15/02   11/06/02    Glenman Industrial                  
                                                            GC-22           6,983                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-23           9,658                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-24          16,308                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-25           5,996                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-26           5,509                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-27           3,199                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-28           5,673                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-29           2,199                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-30          11,463                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-32           5,000                  12/17/02   01/02/03    Glenman Industrial                  
                                                            GC-33           9,256                  01/08/03   02/13/03    Glenman Industrial                  
                                                            GC-35          -1,200                  01/08/03   02/13/03    Glenman Industrial                  
                                                            GC-36           8,503                  01/08/03   02/12/03    Glenman Industrial                  
                                                            GC-37           1,585                  01/16/03   02/12/03    Glenman Industrial                  
                                                            GC-38           7,150                  01/16/03   02/12/03    Glenman Industrial                  
                                                            GC-39           4,000                  02/27/03   03/06/03    Glenman Industrial                  
                                                            GC-40          -9,500                  02/27/03   03/06/03    Glenman Industrial                  
                                                            GC-44           4,035                  05/06/03   05/07/03    Glenman Industrial                  
                                                            GC-46          12,974                  05/10/06   07/31/06    Glenman Industrial Commerical       
                                                            GC-6           27,060                  06/07/02   11/04/02    Glenman Industrial                  
                                                            GC-9           24,472                  07/03/02   07/09/02    Glenman Industrial                  
                                                            HCA-1          30,101                  03/08/02   05/24/02    J&M Heating                         
                                                            HCA-12          7,620                  08/26/02   11/01/02    J&M Heating                         
                                                            HCA-13         12,245                  01/30/03   02/04/03    J&M Heating                         
                                                            HCA-14          2,978                  03/06/03   03/24/03    J&M Heating                         
                                                            HCA-15          6,262                  10/31/03   11/18/03    J&M Heating                         
                                                            HCA-16          4,282                  10/31/03   11/18/03    J&M Heating                         
                                                            HCA-17         -2,669                  05/14/03   05/21/03    J&M Heating                         
                                                            HCA-2           6,626                  03/08/02   05/24/02    J&M Heating                         
                                                            HCB-02          4,174                  02/04/03   02/04/03    J&M Heating                         
                                                            PC-10           6,777                  12/17/02   01/02/03    Heritage Plumbing                   
                                                            PC-12          12,000                  12/17/02   01/02/03    Heritage Plumbing                   
                                                            PC-13           2,867                  12/17/02   01/02/03    Heritage Plumbing                   
                                                            PC-14           3,975                  01/16/03   02/12/03    Heritage Plumbing                   
                                                            PC-15           2,609                  03/20/03   03/24/03    Heritage Plumbing                   
                                                            PC-16           3,992                  02/27/03   03/06/03    Heritage Plumbing                   
                                                            PC-17         -10,000                  03/13/03   03/24/03    Heritage Plumbing                   
                                                            PC-18           7,954                  03/20/03   03/24/03    Heritage Plumbing                   
                                                            PC-19         -11,000                  02/27/03   03/06/03    Heritage Plumbing                   
                                                            PC-2            4,074                  10/16/01   05/22/02    Heritage Plumbing                   
                                                            PC-21           1,413                  05/06/03   05/07/03    Hertiage Plumbing                   
                                                            PC-22           5,269                  05/06/03   05/07/03    Heritage Plumbing                   
                                                            PC-23            -182                  05/06/03   05/07/03    Heritage Plumbing                   
                                                            PC-4            5,759                  08/05/02   08/16/02    Heritage Plumbing                   
                                                            PC-5            5,803                  08/05/02   08/16/02    Heritage Plumbing                   
                                                            PC-6           13,285                  08/05/02   08/16/02    Heritage Plumbing                   
                                                            PC-7           11,820                  08/05/02   08/16/02    Heritage Plumbing                   
                                                            PC-8            1,334                  08/05/02   08/16/02    Heritage Plumbing                   
                                                            PC-9            4,600                  11/12/02   01/10/03    Heritage Plumbing                   
                                                            SC-11          19,783                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-12          18,618                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-14          11,543                  12/17/02   01/02/03    The Losco Group                     
                                                            SC-15          16,223                  12/17/02   01/02/03    The Losco Group                     
                                                            SC-16          18,831                  12/17/02   01/02/03    The Losco Group                     
                                                            SC-19           2,378                  12/17/02   01/02/03    The Losco Group                     
                                                            SC-20           2,785                  01/16/03   02/12/03    The Losco Group                     
                                                            SC-21           4,105                  01/16/03   02/12/03    The Losco Group                     
                                                            SC-22           5,317                  01/16/03   11/18/03    The Losco Group                     
                                                            SC-23           8,012                  03/20/03   03/24/03    The Losco Group                     
                                                            SC-24             831                  03/20/03   03/24/03    The Losco Group                     
                                                            SC-26          20,058                  05/06/03   05/07/03    The Losco Group                     
                                                            SC-27          39,916                  03/20/03   03/24/03    The Losco Group                     
                                                            SC-28          -1,847                  09/05/03   11/17/03    The Losco Group                     
                                                            SC-4            9,859                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-5            8,945                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-6           24,758                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-7            6,757                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-8            4,882                  06/20/02   07/05/02    The Losco Group                     
                                                            SC-9            9,870                  06/21/02   07/05/02    The Losco Group                     
 
06-0017   Reconstruction               0-004-010  12/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1751   Reconstruction               0-004-011  10/21/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1009   Reconstruction               0-004-013  07/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,708                  02/15/11   03/03/11    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            001             3,990                  03/14/11   06/19/13    SOUTHEAST MECHANICAL CORP           
                                                            001             5,100                  09/21/11   11/21/11    DEROSA TENNIS CONTRACTORS INC       
                                                            002             7,515                  02/24/11   05/04/11    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            002             5,680                  09/21/11   11/21/11    DEROSA TENNIS CONTRACTORS INC       
                                                            003            25,600                  04/29/11   05/17/11    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            004             6,242                  07/20/11   09/07/11    SHOCK ELECTRICAL CONTRACTORS INC    
 
11-0913   Reconstruction               0-004-014  05/16/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            22,500                  06/27/13   07/22/13    CLEAN AIR QUALITY SERVICE INC       
                                                            002            -9,357                  03/31/14   07/03/14    Clean Air Quality Services, Inc.    
 
15-0286   Reconstruction               0-004-015  01/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         53,512                  11/08/16   11/16/16    Foremost Electric Corporation       
                                                            EC-002         16,650                  11/23/16   02/06/17    Foremost Electric Corporation       
                                                            EC-003          6,614                  11/23/16   02/06/17    Foremost Electric Corporation       
                                                            EC-004         11,776                  03/01/17   06/06/17    Foremost Electric Corporation       
                                                            EC-005         15,347                  03/01/17   06/06/17    Foremost Electric Corporation       
                                                            EC-006          9,209                  03/01/17   06/06/17    Foremost Electric Corporation       
                                                            EC-007          3,261                  03/01/17   06/18/19    Foremost Electric Corporation       
                                                            EC-008          8,387                  03/01/17   06/06/17    Foremost Electric Corporation       
                                                            EC-009          2,673                  06/16/17   10/30/17    Foremost Electric Corporation       
                                                            EC-010          2,478                  06/16/17   10/30/17    Foremost Electric Corporation       
                                                            GC-001          5,497                  09/08/16   11/21/16    Ferrari & Sons, Inc.                
                                                            GC-002          6,990                  09/08/16   11/21/16    Ferrari & Sons, Inc.                
                                                            GC-003         30,286                  09/08/16   11/21/16    Ferrari & Sons, Inc.                
                                                            GC-004        187,773                  09/08/16   11/21/16    Ferrari & Sons, Inc.                
                                                            GC-005          2,926                  09/08/16   11/21/16    Ferrari & Sons, Inc.                
                                                            GC-006          5,427                  11/23/16   12/12/16    Ferrari & Sons, Inc.                
                                                            GC-007          3,010                  11/23/16   12/12/16    Ferrari & Sons, Inc.                
                                                            GC-008         18,343                  11/23/16   12/12/16    Ferrari & Sons                      
                                                            GC-009          1,454                  11/23/16   12/12/16    Ferrari & Sons, Inc                 
                                                            GC-010          7,442                  11/23/16   12/12/16    Ferrari & Sons, Inc                 
                                                            GC-011         15,570                  03/01/17   07/14/17    Ferrari & Sons, Inc.                
                                                            GC-012         -1,496                  03/01/17   07/14/17    Ferrari & Sons, Inc.                
                                                            GC-013         10,419                  03/01/17   07/14/17    Ferrari & Sons, Inc.                
                                                            GC-014         -7,371                  06/16/17   07/14/17    Ferrari & Sons, Inc.                
                                                            MC-001          2,317                  03/01/17   06/06/17    MDS HVAC-R                          
                                                            MC-002          2,000                  06/16/17   10/30/17    MDS HVAC-R                          
                                                            PC-001          7,050                  06/16/17   10/30/17    L.J. Coppola, Inc.                  
                                                            PC-002          9,103                  06/16/17   06/17/19    L.J. Coppola, Inc.                  
                                                            PC-003          2,616                  06/16/17   10/30/17    L.J. Coppola, Inc.                  
 
14-1267   Reconstruction               0-004-016  03/25/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -20,713                  10/26/15   01/22/16    Posylio GC., Corp                   
 
16-1597   Reconstruction               0-004-017  03/05/18  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0359SC Visual Structural Inspection 0-004-SC1  11/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0177SC Visual Structural Inspection 0-004-SC2  09/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          CV Starr-see 001-not separate bldg:
05-0357SC Visual Structural Inspection 0-009-SC1  11/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Portable at H.H. Wells MS:
95-1669   New Construction             0-010-001  07/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg:
06-0018   Reconstruction               1-005-005  12/23/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1752   Reconstruction               1-005-006  10/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           3,652                  07/02/09   08/31/09    CONSTRUCTION SERVICES LLC           
 
15-0279   Reconstruction               1-005-007  01/29/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          3,700                  10/01/19   10/04/19    BARONE CONSTRUCTION GROUP, INC.     
 

          Maintenance / Storage @ Middle Schoo:
10-0349   New Construction             3-040-001  04/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            032             1,994                  06/27/13   07/26/13    MEYER CONTRACTING                   
 

          Bus Garage:
06-0019   Reconstruction               5-006-005  12/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0305   Reconstruction               5-006-006  11/29/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FA-01         -12,500                  12/10/08   05/04/09    P&D ELECTRIC OF HUDSON VALLEY       
                                                            RC - 01        -5,000                  09/19/07   10/17/07    BEST ROOFING OF .NJ., INC.          
                                                            RC-01          -5,000                  10/23/07   10/25/07    BEST ROOFING OF NJ, INC.            
 
07-1753   Reconstruction               5-006-007  10/21/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0153   Reconstruction               5-006-008  09/04/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1397   Reconstruction               5-006-009  04/28/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          2,828                  10/02/15   11/03/15    Meyer Contracting                   
 
16-1379   Reconstruction               5-006-010  08/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         -7,750                  06/28/19   07/03/19    VEITH ELECTRIC                      
 

          New Press Box @ Brewster Highschool:
09-1010   New Construction             7-039-001  07/14/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Water Tank Bldg @ Middle School:
12-0145   New Construction             7-041-001  01/03/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            38,648                  03/31/14   07/03/14    Clean Air Quality Services, Inc.    
                                                            002             5,056                  04/14/14   05/02/14    CLEAN AIR QUALITY SERVICE INC       
                                                            003             9,000                  07/23/14   10/29/14    Clean Air Quaility Services, Inc.   
                                                            004               443                  04/16/15   04/24/15    Clean Air Quality Services, Inc.    
 

          Restroom/Concession Building:
14-1468   New Construction             7-043-001  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          CVS Modular:
21-1955   New Construction             7-045-001  05/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          JFK Elementary:
21-1956   New Construction             7-046-001  05/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
14-1341   Reconstruction               7-999-002  05/08/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -37,740                  09/16/15   10/07/15    Day Automation                      
                                                            002             4,350                  02/02/16   04/18/16    DAY AUTOMATION                      
                                                            003             4,167                  02/02/16   11/01/16    DAY AUTOMATION                      
                                                            004             4,770                  05/13/16   05/19/16    DAY AUTOMATION`                     
                                                            005            23,338                  07/06/16   08/04/16    Day Automation                      
                                                            006            -6,854                  07/06/16   08/04/16    Day Automation                      
 

BOCES PUTNAM-WESTCHESTER STATUS REPORT ON CAPITAL PROJECTS
District No.: 48-90-00-00
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Special Ed Bldg B:
02-1360   Reconstruction               0-003-002  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0481   Reconstruction               0-003-003  01/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -288                  08/03/05   10/12/06    Hammond Electrical Contracting      
                                                            1              -2,000                  07/19/06   04/11/07    Clean Air Quality                   
 
06-0593   Reconstruction               0-003-004  01/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,270                  04/01/09     /  /      FILINGERI ELECTRICAL CONTRACTING    
                                                            GC-01          13,275                  03/31/09   08/21/09    NAC INDUSTRIES, INC.                
                                                            GC-02           9,025                  03/31/09   08/21/09    NAC INDUSTRIES, INC.                
                                                            HC-01         -14,980                  03/31/09   08/21/09    JNS HEATING SERVICES, INC.          
                                                            HC-02         -14,278                  03/31/09   08/21/09    JNS HEATING SERVICES, INC.          
 
08-1454   Reconstruction               0-003-005  07/06/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            000001              0                  12/09/14   02/07/14    Mengler Mechanical Inc              
                                                            000001              0                  12/09/14   02/07/14    J & J Sass Electric, Inc.           
                                                            000002              0                  12/09/14   02/07/14    Mengler Mechanical Inc              
                                                            000002         -7,066                  03/12/14   05/30/14    J & J Sass Electric, Inc.           
                                                            00001           7,977                  12/23/13   02/04/14    J & J Sass Electric, Inc.           
                                                            00001           8,302                  01/31/14   02/21/14    MENGLER MECHANICAL INC              
                                                            00009          -8,302                  09/30/15   01/29/16    Marpat Construction                 
                                                            1              -2,500                  03/31/15   04/13/15    Rok Built Construction              
                                                            13             -1,543                  03/31/15   04/13/15    Marpat Construction                 
                                                            2             -50,195                  03/31/15   04/13/15    Marpat Construction                 
                                                            3             -42,717                  03/31/15   04/13/15    Marpat Construction                 
                                                            4              -9,738                  03/31/15   04/13/15    Marpat Construction                 
                                                            5             -44,900                  03/31/15   04/13/15    Marpat Construction                 
                                                            7              -7,977                  03/31/15   04/13/15    Marpat Construction                 
                                                            8             -18,899                  03/31/15   04/13/15    Marpat Construction                 
                                                            EC-01           2,647                  02/14/11   03/01/11    HEALY ELECTRIC CONTRACTING INC      
                                                            EC-02               0                  02/14/11   03/01/11    HEALY ELECTRIC CONTRACTING INC      
                                                            GC-01          -1,324                  12/15/10   02/11/11    MELWOOD CONTRACTING CORP            
                                                            GC-03            -880                  01/07/11   07/15/11    MELWOOD CONTRACTING CORP            
                                                            GC-04          -5,484                  09/22/11   11/01/11    MELWOOD CONTRACTING CORP            
                                                            GC-05            -900                  06/11/12   11/13/12    MELWOOD CONTRACTING CORP            
                                                            HC-01          -2,906                  01/30/12   07/20/12    MENGLER MECHANICAL INC              
 
12-0633   Reconstruction               0-003-007  03/28/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00006          -2,750                  12/23/13   02/04/14    Marpat Construction                 
                                                            00008         -18,899                  12/23/13   02/04/14    Marpat Construction                 
                                                            00010         -29,696                  01/31/14   03/21/14    Marpat Construction                 
                                                            00011            -653                  01/31/14   02/24/14    MARPAT CONSTRUCTION                 
                                                            00012           5,117                  03/12/14   04/15/14    Marpat Construction                 
 
12-0588   Reconstruction               0-003-009  05/22/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           4,846                  06/24/15   08/04/15    Hydroworx                           
                                                            EC-01          -7,236                  11/07/16   11/16/16    RLJ Electric Corp.                  
                                                            EC-AD01             0                  12/10/15   12/28/15    RLJ Electric Corp.                  
                                                            GC-01           4,014                  01/08/15   01/29/15    Key Construction Services           
                                                            GC-02           1,437                  02/24/15   03/18/15    Key Construction Services           
                                                            GC-03           1,200                  02/24/15   03/18/15    Key Construction Services           
                                                            GC-04          29,400                  03/08/16   03/24/16    Key Construction Services           
                                                            GC-05           3,015                  03/08/16   03/24/16    Key Construction Services           
                                                            GC-06           6,314                  03/08/16   03/24/16    Key Construction Services           
                                                            GC-07         -18,033                  03/08/16   03/24/16    Key Construction Services           
                                                            GC-08          -3,407                  07/27/16   09/30/16    Key Construction Services           
                                                            GC-AD02             0                  03/08/16   03/24/16    Key Construction SErvices           
                                                            GC-AD03             0                  03/08/16   03/24/16    Key Construction SErvices           
                                                            GCAD01              0                  12/11/14   12/22/14    Key Construction Services           
                                                            PC-01          -2,717                  12/10/15   12/28/15    Clean Air Quality Services          
                                                            PC-AD01             0                  12/10/15   12/28/15    Clean Air Quality Services          
 
18-1321   Reconstruction               0-003-010  04/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1256FP Reconstruction               0-003-FP1  03/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tech Bldg C:
02-1361   Reconstruction               0-004-002  06/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              15,625                  02/09/06     /  /      Herbert martin                      
 
09-0833   Reconstruction               0-004-004  01/04/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-02          -6,010                  11/01/12   02/25/13    MENGLER MECHANICAL INC              
 
12-0694   Reconstruction               0-004-005  05/21/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00001         -17,720                  09/28/16     /  /      GRS Construction Corp.              
                                                            00002               0                  09/28/16     /  /      GTS Construction Corp.              
                                                            AD-0001             0                  05/31/16   06/06/16    GTS CONTRUCTION CORP                
                                                            EC-AD01             0                  12/10/15   01/04/16    Fillingeri Electric                 
                                                            EC-AD02             0                  12/10/15     /  /      Fillingeri Electric                 
                                                            EC-CO01        -3,578                  03/08/16   03/18/16    Fillingeri Electric                 
                                                            MC-01         -20,000                  05/05/16   05/31/16    SOUTHEAST MECHANICAL                
 
18-1322   Reconstruction               0-004-006  04/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Building D:
06-0526   Reconstruction               0-005-002  12/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0688   Reconstruction               0-005-004  05/16/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-02               0                  04/06/15   04/21/15    Key Construction Serivces           
                                                            EC-AD1              0                  09/25/14   10/08/14    All Bright Electric                 
                                                            GC-01               0                  04/06/15   04/21/15    Key Construction Services           
                                                            GC-02               0                  04/06/15   04/21/15    Key Construction Services           
                                                            GC-03          -1,440                  07/27/16   11/02/16    Key Construction Services           
                                                            GC-AD-01            0                  10/20/14   10/23/14    Key Construction Services           
                                                            MC-CO001      -15,000                  01/08/15   01/29/15    DJ Heating & Air Conditioning, Inc. 
                                                            R-D-CO01       -2,900                  09/23/15   09/25/15    A.B.C.D. Construction               
                                                            R-D-CO02         -800                  09/23/15   09/25/15    A.B.C.D. Construction               
                                                            R-D-CO03       -5,457                  09/23/15   09/25/15    A.B.C.D. Construction               
 
18-1670   Reconstruction               0-005-005  04/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          School Services A:
12-0693   Reconstruction               0-006-001  05/22/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -27,331                  07/27/16   10/07/16    Renu Contracting & Restoration      
                                                            00001          -1,186                  11/07/16   11/22/16    GTS Construction                    
                                                            00002          98,000                  03/12/18   03/30/18    GTS Construction                    
                                                            AD-01               0                  05/05/16   05/19/16    GTS CONSTRUCTION                    
                                                            EC-AD01             0                  12/10/15   01/04/16    D&M Electric Contracting            
                                                            EC-AD02             0                  12/10/15   01/04/16    D&M Electric Contracting            
                                                            EC-AD03             0                  12/10/15   01/04/16    D&M Electric Contracting            
                                                            EC-AD04             0                  12/10/15   01/04/16    D&M Electric Contracting            
                                                            EC-CO-01       -5,479                  09/28/16     /  /      D & M Electric Contracting          
                                                            GC-AD01             0                  12/10/15   01/04/16    Renu Construction                   
                                                            GC-CO-02       -5,846                  07/27/16   10/07/16    Renu Contracting & Restoration      
                                                            MC-CO001      -45,000                  03/08/16   03/18/16    Pearl River Plumbing & Heating      
                                                            MC-CO02        -2,000                  09/28/16     /  /      Pearl River Plumbing, Heating & Elec
                                                            RC03           13,800                  06/21/18   07/26/18    GTS CONSTRUCTION                    
 
18-1323   Reconstruction               0-006-003  04/18/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Building E:
09-0274   Reconstruction               0-011-001  11/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0692   Reconstruction               0-011-002  05/22/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001               0                  11/07/16   11/22/16    Everfoam Insulation                 
                                                            EC-AD-01            0                  12/20/16   07/09/19    All Bright Electric                 
                                                            EC-AD01             0                  05/26/17   06/26/17    All Bright Electric                 
                                                            ECCO-01        -3,275                  05/08/17   05/09/17    All Bright Electric                 
                                                            GC-CO-01       -7,659                  03/02/17   03/30/17    Everfoam Insulation                 
                                                            GC-CO-02       -1,236                  03/02/17   03/30/17    Everfoam Insulation                 
                                                            GC-CO-02            0                  03/02/17   03/30/17    Everfoam Insulation Systems, Inc.   
                                                            MC-AD-07            0                  03/02/17   03/07/17    Southeast Mechanical Corp.          
                                                            MC-AD01        -5,515                  09/28/16     /  /      Southeast Mechanical Corp.          
                                                            MC-AD02        -4,143                  09/28/16   10/21/16    Arris Contracting Company, Inc.     
                                                            MC-AD03             0                  12/20/16   07/09/19    Southeast Mechanical Corp.          
                                                            MC-AD04             0                  12/20/16     /  /      Southeast Mechanical Corp.          
                                                            MC-AD05             0                  05/26/17   06/26/17    Southeast Mechanical Corp.          
                                                            MC-CO-01      -21,755                  09/28/16     /  /      Southeast Mechanical Corp.          
                                                            MC-CO-02       -4,666                  03/02/17   03/07/17    Southeast Mechanical Corp.          
 

          Walden In Woods:
94-1529   Reconstruction               0-013-001  06/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fox Meadows - Building 7:
12-0689   Reconstruction               2-027-001  05/22/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-7-CO01         -750                  09/23/15   09/25/15    A.B.C.D. Construction               
                                                            R-7-CO02       -3,020                  09/23/15   09/25/15    A.B.C.D. Construction               
                                                            R-7-CO03      -16,484                  09/23/15   09/25/15    A.B.C.D. Construction               
                                                            R-7-CO04       10,227                  09/23/15   09/25/15    A.B.C.D. Construction               
 

          Fox Meadows - Building 9:
12-0690   Reconstruction               2-028-001  05/22/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001        -129,541                  02/11/14   02/11/14    MARPAT CONSTRUCTION                 
                                                            00001           1,478                  09/30/15   11/17/15    WB Contracting Corp                 
                                                            EC-AD-01            0                  12/20/16     /  /      Veith Electric                      
                                                            MC-AD-02            0                  12/20/16     /  /      Carey & Walsh, Inc.                 
                                                            MC-AD-02            0                  05/26/17   06/26/17    Carey & Walsh, Inc.                 
                                                            MC-CO-02         -832                  12/20/16   12/22/16    Carey & Walsh, Inc.                 
 

          Fox Meadows - Building 8:
12-0691   Reconstruction               2-029-001  05/22/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-AD-02            0                  12/20/16   07/09/19    Veith Electric                      
                                                            MC-AD-01            0                  05/26/17   06/26/17    Carey & Walsh, Inc.                 
                                                            MC-AD-01            0                  12/20/16   07/09/19    Carey & Walsh, Inc.                 
                                                            MC-CO-01          832                  12/20/16   12/22/16    Carey & Walsh, Inc.                 
                                                            MC-CO-03         -994                  12/20/16   12/22/16    Carey & Walsh, Inc.                 
                                                            R-8-CO01       -5,350                  09/23/15   11/17/15    A.B.C.D. Construction               
                                                            R-8-CO02         -800                  09/23/15   11/17/15    A.B.C.D. Construction               
                                                            R-8-CO03      -13,412                  09/23/15   11/17/15    A.B.C.D. Construction               
 

          Madden Outdoor Educ. Center:
90-0670   New Construction             7-058-001  01/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lease Portable-John Jay H.S.:
95-0026   New Construction             8-061-001  08/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE