ALTMAR-PARISH-WILLIAMSTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-01-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
96-0301   Reconstruction               0-001-007  10/31/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0286   Reconstruction               0-001-008  09/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1301   Additions and Alterations    0-001-009  07/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-R11/      -21,460                  10/07/02   11/08/02    PTL Roofing                         
                                                            003-GC11      -22,537                  09/16/05   09/16/05    Parsons McKenna                     
                                                            003-TC11       -1,170                  04/24/02   05/07/02    Upstate Temperature Control         
                                                            004-GC11      104,331                  09/16/05   09/16/05    Parsons McKenna                     
                                                            004-Hll         7,561                  04/24/02   05/07/02    Airtech Heating                     
                                                            005-H11/       13,518                  06/25/02   07/15/02    Airtech Heating                     
                                                            005-P11        -7,411                  07/16/02   07/24/02    Empire Northeast                    
                                                            006-H11         3,935                  07/16/02   07/24/02    Airtech Heating                     
                                                            007-E11         5,805                  03/05/02   04/18/02    Patricia Elec.                      
                                                            007-GC11         -249                  09/16/05   09/16/05    Parsons McKenna                     
                                                            008-E11         4,550                  03/05/02   04/18/02    Patricia Elec.                      
                                                            008-GC11       -1,468                  09/16/05   09/16/05    Parsons Mckenna                     
                                                            009-E11/        4,078                  03/29/02   05/10/02    Patricia Elec.                      
                                                            010-E11/        3,870                  06/14/02   07/10/02    Patricia Elec.                      
                                                            011-E11        19,111                  11/04/02   02/06/03    Patricia Elec.                      
                                                            012-E11         1,239                  12/12/02   09/16/05    Patricia Elec.                      
                                                            019-GC11        6,945                  06/25/02   07/15/02    Parsons McKenna                     
                                                            020-GC11        2,753                  04/29/02   05/07/02    Parsons McKenna                     
                                                            021-GC11        9,125                  04/29/02   05/07/02    Parsons McKenna                     
                                                            022-GC11        5,450                  04/29/02   05/07/02    Parsons McKenna                     
                                                            023-GC11       -1,390                  06/25/02   07/12/02    Parsons McKenna                     
                                                            025-GC11        1,268                  01/10/03   01/16/03    Parsons McKenna                     
 
01-0994   Reconstruction               0-001-010  05/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-R31       -15,414                  03/27/03   03/31/03    PTL Contracting                     
                                                            004-R31        40,700                  11/21/03   11/24/03    PTL Contracting                     
                                                            005-R31        50,200                  11/21/03   11/24/03    PTL Contracting                     
                                                            007-R31         5,175                  11/21/03   11/24/03    PTL Contracting                     
 
03-0200   Reconstruction               0-001-011  08/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0320   Additions and Alterations    0-001-012  03/17/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          2,483                  10/25/11   05/14/12    HUEN NEW YORK INC                   
                                                            EC-002            549                  10/25/11   05/14/12    HUEN NEW YORK INC                   
                                                            EC-003          3,057                  10/25/11   05/14/12    HUEN NEW YORK INC                   
                                                            EC-004          9,487                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-005          1,317                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-007         -9,929                  12/28/11   05/15/12    Huen New York Inc.                  
                                                            EC-008         -1,300                  12/28/11   05/15/12    Huen New York Inc.                  
                                                            EC-011         29,656                  09/12/12   02/07/14    HUEN NEW YORK INC                   
                                                            EC-014          2,403                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-016         10,000                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-017          8,454                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-019          1,242                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-020B             0                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-021          8,458                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-022          2,961                  12/13/12   07/16/13    HUEN NEW YORK INC                   
                                                            EC-023         -1,517                  12/13/12   07/16/13    HUEN NEW YORK INC                   
                                                            EC-026          1,287                  11/09/12   07/16/13    Huen New York Inc.                  
                                                            EC-027          8,466                  11/09/12   08/16/13    Huen New York Inc.                  
                                                            EC-028          3,978                  11/09/12   08/16/13    Huen New York Inc.                  
                                                            EC-030          2,527                  12/13/12   07/16/13    HUEN NEW YORK INC                   
                                                            EC-031          1,737                  12/13/12   07/16/13    HUEN NEW YORK INC                   
                                                            EC-032          1,445                  12/13/12   07/16/13    HUEN NEW YORK INC                   
                                                            GC-004          8,614                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-005         12,933                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-006        -19,462                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-007         17,958                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-009          1,172                  09/12/12   01/07/13    BETTE & CRING LLC                   
                                                            GC-011          2,288                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-012          1,105                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-013          2,255                  10/25/11   12/28/11    BETTE & CRING LLC                   
                                                            GC-014          1,204                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-015          7,555                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-016          5,967                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-018         11,124                  09/12/12   01/07/13    BETTE & CRING LLC                   
                                                            GC-020         22,175                  09/12/12   01/07/13    BETTE & CRING LLC                   
                                                            GC-021         36,630                  09/12/12   01/07/13    BETTE & CRING LLC                   
                                                            GC-027          4,545                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-028         36,809                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-031          9,420                  09/12/12   12/19/12    Bette & Cring LLC                   
                                                            GC-032         13,000                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-033        -13,112                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-034         11,854                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-035         10,419                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-037          6,747                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-039          6,324                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-040          5,546                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-041          6,670                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-042         10,747                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-043         16,218                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-045         14,537                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-046         14,876                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-047          1,952                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-049            450                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-050          7,069                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-051B             0                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-052          1,414                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-056          7,901                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-057          8,519                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-058          6,616                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-059          5,772                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-060         13,197                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-061          1,552                  11/09/12   03/04/13    Bette & Cring, LLC                  
                                                            GC-062         -6,610                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-063          7,782                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-064         -2,899                  09/16/13   10/21/13    Bette & Cring, LLC                  
                                                            HA-001         11,505                  09/12/12   12/18/12    EXCEL INSULATION COMPANY INC        
                                                            HA-002         42,200                  09/12/12   12/18/12    EXCEL INSULATION COMPANY INC        
                                                            HA-003          7,200                  01/06/12   05/17/12    EXCEL INSULATION COMPANY INC        
                                                            HA-004         13,450                  03/30/12   08/24/12    EXCEL INSULATION COMPANY INC        
                                                            HA-005          7,500                  09/12/12   12/18/12    EXCEL INSULATION COMPANY INC        
                                                            HA-006         -1,758                  09/12/12   12/18/12    EXCEL INSULATION COMPANY INC        
                                                            HA-007           -450                  09/12/12   12/18/12    EXCEL INSULATION COMPANY INC        
                                                            HC-001          3,128                  09/12/12   07/29/13    AIRTECH HEATING & A/C INC           
                                                            HC-002          1,550                  09/12/12   07/16/13    AIRTECH HEATING AND A/C INC         
                                                            HC-003          1,653                  12/28/11   05/15/12    Airtech Heating and A/C Inc.        
                                                            HC-004         -2,731                  12/13/12   07/16/13    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            HC-005         -5,343                  08/09/13   12/18/13    Airtech, Heating and Air Conditoning
                                                            PC-001          4,766                  10/25/11   05/14/12    BELLUCCI ENTERPRISES INC            
                                                            PC-002            967                  10/25/11   05/14/12    BELLUCCI ENTERPRISES INC            
                                                            PC-004         16,000                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-006         11,087                  12/28/12   05/15/12    Bellucci Enterprises Inc.           
                                                            PC-007          1,331                  09/12/12   01/11/13    BELLUCCI ENTERPRISES INC            
                                                            PC-008          1,040                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-011          2,184                  12/28/11   05/15/12    Bellucci Enterprises Inc.           
                                                            PC-013         10,338                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-015          5,187                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-017          1,043                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-018A             0                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-019          8,654                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-021          1,163                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-022           -303                  12/13/12   07/03/13    BELLUCCI ENTERPRISES INC            
                                                            PC-024          3,461                  12/13/12   08/16/13    BELLUCCI ENTERPRISES INC            
                                                            PV-001        -41,860                  09/12/12   07/03/13    SOLAR LIBERTY ENERGY INC            
                                                            PV-004         -7,500                  09/12/12   07/03/13    SOLAR LIBERTY ENERGY INC            
                                                            SC-002          3,316                  09/12/12   12/18/12    BARBER CORPORATION                  
                                                            SC-003        -17,000                  09/12/12   12/18/12    BARBER CORPORATION                  
                                                            SC-009              0                  12/13/12   03/15/13    BARBER CORPORATION                  
                                                            SC-010          6,320                  12/13/12   03/15/13    BARBER CORPORATION                  
                                                            SC-011          2,728                  12/13/12   03/21/13    BARBER CORPORATION                  
                                                            SC-012A          -746                  12/13/12   03/25/13    BARBER CORPORATION                  
                                                            SC-013        -10,872                  01/18/13   05/17/13    BARBER CORPORATION                  
 
07-0902   Reconstruction               0-001-013  04/29/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  03/06/09   05/27/09    CENTRAL CITY ROOFING CO., INC.      
                                                            002                 0                  03/06/09   05/27/09    CENTRAL CITY ROOFING CO., INC.      
 
15-0765   Reconstruction               0-001-015  11/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-001          18,200                  07/14/16   08/23/16    J&A MECHANICAL CONTRACTORS          
 
16-1103   Reconstruction               0-001-016  03/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-003         -6,859                  08/04/17   08/10/17    WCA Roofing & Sheet Metal Co., Inc. 
 
16-1457   Reconstruction               0-001-017  11/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-001          4,188                  08/13/18   08/28/18    RIDLEY ELECTRIC CO INC              
                                                            PC-001         11,957                  08/13/18   08/28/18    BELLUCCI ENTERPRISES IN             
 
17-0224   Reconstruction               0-001-018  01/22/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0761   Reconstruction               0-001-019  02/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           44,726                  09/30/19   10/07/19    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            1-02           15,124                  09/30/19   10/07/19    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            1-03           69,351                  09/30/19   10/07/19    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            1-04            5,402                  09/30/19   10/07/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
 
20-1698   Reconstruction               0-001-020  07/13/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0137   Reconstruction               0-001-021  12/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1280   Additions and Alterations    0-001-022  05/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0221FP Reconstruction               0-001-FP1  11/27/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXAltmar Elementary (sold 2012):
90-1701   Reconstruction               0-002-003  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1615   Reconstruction               0-002-004  07/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0302   Reconstruction               0-002-005  10/31/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1303   Reconstruction               0-002-006  07/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001FSE11       -8,780                  04/29/02   05/07/02    Joseph Flihan                       
                                                            002-E21        -2,250                  04/25/01   01/15/02    Meacham Elec.                       
                                                            002-H21        -4,440                  07/16/02   07/24/02    Empire Northeast                    
                                                            002-P21         4,449                  07/23/01   01/08/02    Empire Northeast                    
                                                            003-P21        -5,801                  07/16/02   07/24/02    Empire Northeast                    
                                                            003-S21        -3,500                  08/21/01   01/09/02    Davis Wallbridge                    
                                                            004-E21         3,229                  03/05/02   04/18/02    Meacham Elec.                       
                                                            004-GC21       -6,000                  04/25/01   01/15/02    Laurence Const.                     
                                                            005-E21         1,169                  06/25/02   07/15/02    Meacham Elec.                       
                                                            006-E21         1,749                  09/16/02   04/01/03    Meacham Elec.                       
                                                            007-E21           857                  09/16/02   02/06/03    Meacham Elec.                       
                                                            007-GC21          842                  04/24/02   05/07/02    Laurence Const.                     
                                                            008-GC21        9,441                  03/27/03   04/30/03    Laurence Const.                     
                                                            E21/070        26,587                  11/09/01   02/12/02    Meacham Elec.                       
                                                            GC21-058       -7,012                  12/31/01   02/28/02    Laurence Const.                     
                                                            S21/063        14,410                  11/07/01   02/08/02    Davis Wallbridge                    
 
01-0995   Reconstruction               0-002-007  05/20/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0201   Reconstruction               0-002-008  08/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXParish Elementary(sold 2013):
99-1304   Reconstruction               0-003-005  07/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            010-GC21       -9,436                  03/27/03   04/03/03    Laurence Const.                     
 
01-0996   Reconstruction               0-003-006  05/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006-R31        20,785                  11/21/03   11/24/03    PTL Contracting                     
 
03-0202   Reconstruction               0-003-007  08/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary School (frmly MS):
99-1300   Reconstruction               0-005-004  07/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-E11        -1,640                  01/04/01   01/14/03    Patricia Elec.                      
                                                            001-GC11     -197,945                  01/11/01   01/15/02    Parsons McKenna                     
                                                            001-P11       -15,500                  01/29/01   01/30/02    Empire Northeast                    
                                                            001-TC11      -36,560                  05/15/01   01/13/03    Upstate Temperature Control         
                                                            002-E-11       46,600                  01/18/01   01/14/03    Patricia Elec.                      
                                                            002-E11       -46,600                  02/20/01   01/13/03    Patricia Elec.                      
                                                            002-P11        -7,350                  01/29/01   01/14/03    Empire Northeast                    
                                                            002-R31       -15,414                  02/10/03   02/19/03    PTL Roofing                         
                                                            002ACM11       17,179                  08/06/01   03/29/02    Summit Environ.                     
                                                            002GC-11      -36,465                  01/29/01   01/30/02    Parsons McKenna                     
                                                            002R-31       -15,414                  02/10/03   02/14/03    PTL Roofing                         
                                                            003-E11       -26,060                  01/29/01   01/30/02    Patricia Elec.                      
                                                            003-GC11      -22,537                  09/16/05   09/16/05    Parsons McKenna                     
                                                            003ACM11       39,780                  10/02/01   01/08/02    Summit Environ.                     
                                                            003H11         -2,710                  01/29/01   01/30/02    Airtech Heating                     
                                                            004-GC11     -104,331                  09/16/05   09/16/05    Parsons McKenna                     
                                                            004-P11       -11,447                  07/23/01   01/14/03    Empire Northeast                    
                                                            004-TC11      -10,515                  01/21/03   01/23/03    Upstate Temperature Control         
                                                            005-E11        16,057                  06/28/01   01/29/02    Patricia Elec.                      
                                                            005-P11        -7,411                  07/18/02   08/28/02    Empire Northeast                    
                                                            005H1187       13,518                  07/24/02     /  /      Airtech Heating                     
                                                            006-H11         3,935                  07/18/02   08/28/02    Airtech Heating                     
                                                            006-S11       -47,050                  10/02/01   01/08/02    Robert Law                          
                                                            007-S11        63,943                  10/02/01   01/08/02    Robert Law                          
                                                            008-E11         4,550                  03/05/02     /  /      Patricia Elec.                      
                                                            008-GC11       -1,468                  09/16/05   09/16/05    Parsons McKenna                     
                                                            008-S11        51,035                  10/02/01   01/08/02    Robert Law                          
                                                            009E11          4,078                  03/28/02   04/26/02    Patricia Elec.                      
                                                            010-GC11       14,761                  07/23/01   01/14/03    Parsons McKenna                     
                                                            010-S11         6,886                  12/13/01   01/13/03    Robert Law                          
                                                            011-GC11       18,277                  07/23/01   01/14/03    Parsons McKenna                     
                                                            011-S11         4,201                  01/28/02   03/06/02    Robert Law                          
                                                            012-GC11        4,515                  09/16/05   09/16/05    Parsons McKenna                     
                                                            012-S11        -4,004                  01/30/03   02/11/03    Robert Law                          
                                                            013-GC11       27,982                  10/02/01   01/08/02    Parsons McKenna                     
                                                            013-S11        13,024                  01/21/03   01/23/03    Robert Law                          
                                                            014-GC11       -1,976                  09/04/01   01/09/02    Parsons McKenna                     
                                                            017-GC11       85,885                  03/05/02   04/18/02    Parsons McKenna                     
                                                            018-GC11        7,571                  01/28/02   03/06/02    Parsons McKenna                     
                                                            019GC117        6,945                  07/24/02   08/28/02    Parsons McKenna                     
                                                            023GC118       -1,390                  07/24/02   08/28/02    Parsons McKenna                     
                                                            024-GC11        1,142                  01/10/03   02/06/03    Parsons McKenna                     
                                                            ACM11/65      -15,583                  11/08/01   02/08/02    Summit Environ.                     
                                                            E11/069         2,272                  11/07/01   02/08/02    Patricia Elec.                      
                                                            GC11/066       17,998                  11/23/01   02/11/02    Parsons McKenna                     
                                                            GC11/068        4,795                  11/07/01   02/08/02    Parsons McKenna                     
                                                            S11/064       134,403                  11/06/01   02/08/02    Robert Law                          
 
03-0203   Reconstruction               0-005-005  08/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0321   Additions and Alterations    0-005-006  03/17/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-006         -2,420                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-009            838                  12/28/11   05/15/12    Huen new York Inc.                  
                                                            EC-010         29,535                  09/12/12   02/07/14    HUEN NEW YORK INC                   
                                                            EC-012          3,215                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-013          4,210                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-015         10,516                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-018          4,591                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-020A             0                  09/12/12   01/10/13    HUEN NEW YORK INC                   
                                                            EC-024          2,422                  11/09/12   07/16/13    Huen New York Inc.                  
                                                            EC-025            114                  11/09/12   07/03/13    Huen New York Inc.                  
                                                            EC-029          3,228                  12/13/12   08/16/13    HUEN NEW YORK INC                   
                                                            GC-001          1,193                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-002         17,445                  09/12/12   01/07/13    BETTE & CRING LLC                   
                                                            GC-003         18,099                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-008          1,530                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-010          7,357                  09/12/12   01/07/13    BETTE & CRING LLC                   
                                                            GC-017          1,146                  10/25/11   12/14/11    BETTE & CRING LLC                   
                                                            GC-019         12,684                  09/12/12   01/07/13    BETTE & CRING LLC                   
                                                            GC-022            997                  12/28/11   05/15/12    Bette & Cring, LLC                  
                                                            GC-023          5,500                  12/28/11   05/15/12    Bette & Cring, LLC                  
                                                            GC-025         26,554                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-026          8,005                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-029          3,915                  03/30/12   08/14/12    BETTE & CRING LLC                   
                                                            GC-030          5,381                  03/30/12   08/14/12    BETTE & CRING LLC                   
                                                            GC-036          8,642                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-038          3,413                  09/12/12   12/19/12    BETTE & CRING LLC                   
                                                            GC-044          6,568                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-048          1,077                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-051A             0                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-053          5,548                  09/12/12   12/18/12    BETTE & CRING LLC                   
                                                            GC-054          2,865                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-055          3,068                  12/13/12   03/21/13    BETTE & CRING LLC                   
                                                            GC-CO-15        7,049                  12/27/11   02/23/12    Daniel J. Lynch, Inc.               
                                                            PC-003         10,000                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-005          1,507                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-009          3,843                  12/28/11   05/15/12    Bellucci Enterprises Inc.           
                                                            PC-010          1,936                  12/28/12   05/15/12    Bellucci Enterprises Inc.           
                                                            PC-012          7,952                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-014            829                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-016          7,328                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-018B          -173                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-020          4,386                  09/12/12   01/10/13    BELLUCCI ENTERPRISES INC            
                                                            PC-023          2,510                  12/13/12   07/16/13    BELLUCCI ENTERPRISES INC            
                                                            PC-025         -4,000                  12/06/13   12/18/13    BELLUCCI ENTERPRISES INC.           
                                                            PV-002        -41,860                  09/12/12   07/03/13    SOLAR LIBERTY ENERGY INC            
                                                            PV-003         -7,500                  06/06/12   02/05/13    SOLAR LIBERTY ENERGY INC            
                                                            SC-001       -132,244                  09/12/12   12/18/12    BARBER CORPORATION                  
                                                            SC-004          6,860                  09/12/12   12/18/12    BARBER CORPORATION                  
                                                            SC-005          9,487                  09/16/13   10/21/13    Barber Corporation                  
                                                            SC-006         -1,485                  09/12/12   12/18/12    BARBER CORPORATION                  
                                                            SC-007          5,051                  09/12/12   12/18/12    BARBER CORPORATION                  
                                                            SC-008        -82,000                  09/12/12   12/18/12    BARBER CORPORATION                  
                                                            SC-012              0                  12/13/12   03/25/13    BARBER CORPORATION                  
 
15-1458   Reconstruction               0-005-007  06/09/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1104   Reconstruction               0-005-008  03/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AARC-001            0                  02/14/18   03/07/18    WCA Roofing & Sheet Metal Co., Inc. 
                                                            AASC-001            0                  07/26/17   07/27/17    EZ Paving/Sealcoat LLC.             
                                                            AASC-002            0                  03/29/18   04/12/18    EZ Paving/Sealcoat LLC              
                                                            AASC-003            0                  03/29/18   04/12/18    EZ Paving/Sealcoat LLC              
                                                            AASC-004            0                  03/29/18   04/12/18    EZ Paving/Sealcoat LLC              
                                                            RC-001       -122,720                  07/28/17   07/31/17    WCA Roofing & Sheet Metal Co., Inc. 
                                                            RC-002         10,725                  07/28/17   07/31/17    WCA Roofing & Sheet Metal Co., Inc. 
                                                            RC-004        -22,000                  11/29/17   12/15/17    WCA Roofing & Sheet Metal Co Inc    
                                                            RC-005        -11,750                  02/14/18   03/07/18    WCA Roofing & Sheet Metal Co., Inc. 
                                                            SC-001        -12,926                  03/29/18   04/12/18    EZ Paving/Sealcoat LLC              
 
16-1458   Reconstruction               0-005-009  11/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003            797                  09/04/18   09/12/18    RIDLEY ELECTRIC CO INC              
                                                            GC-001         -5,125                  12/19/18   02/04/19    MCGINNIS NELSON CONSTRUCTION, INC.  
                                                            GC-002         -7,500                  12/19/18   01/29/19    MCGINNIS NELSON CONSTRUCTION, INC.  
                                                            PC-002          6,428                  08/13/18   08/28/18    BELLUCCI ENTERPRISES INC            
                                                            PC-003          6,313                  10/25/18   11/15/18    BELLUCCI ENTERPRISES INC            
 
18-0762   Reconstruction               0-005-010  02/04/19  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0465FA Additions and Alterations    0-005-012  11/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0222FP Reconstruction               0-005-FP1  11/27/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXWilliamstown Elementary (sold 2012:
90-1702   Reconstruction               0-006-005  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0124   Reconstruction               0-006-006  08/30/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1613   Additions and Alterations    0-006-007  07/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1614   Reconstruction               0-006-008  07/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0303   Reconstruction               0-006-009  10/31/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1305   Reconstruction               0-006-010  07/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-R31        30,540                  02/10/03   03/28/03    PTL Roofing                         
                                                            009-G21           270                  03/28/03   04/03/03    Laurence Const.                     
 
01-0997   Reconstruction               0-006-011  05/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-R31        30,540                  02/10/03   02/19/03    PTL Roofing                         
 
03-0204   Reconstruction               0-006-012  08/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0223FP Reconstruction               0-006-FP1  11/27/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building:
22-1281   New Construction             2-027-001  05/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBus Maintenance - demo 2004:
94-0706   Reconstruction               5-015-001  02/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1652   Reconstruction               5-015-002  06/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0205   Reconstruction               5-015-004  08/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Facility:
99-1302   New Construction             5-019-001  07/24/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004-GC11     -104,331                  09/16/05   09/16/05    Parsons McKenna Construction        
 
04-0133   Reconstruction               5-019-002  09/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PL-1           -2,000                  01/31/04   02/24/05    Paragon Environmental Construction  
 
16-1459   Reconstruction               5-019-005  11/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
22-0138   Reconstruction               5-019-006  12/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Waste Water Treatment:
09-0322   Reconstruction               7-017-002  03/17/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          5,730                  09/12/12   01/10/13    S.C. SPENCER ELECTRIC INC           
                                                            EC-002          9,425                  01/17/13   08/23/13    S.C. SPENCER ELECTRIC INC           
                                                            EC-003         31,350                  01/17/13   08/23/13    S.C. SPENCER ELECTRIC INC           
                                                            GC-001         -1,390                  09/12/12   01/07/13    C.O. FALTER CONSTRUCTION CORP       
                                                            GC-002         -9,183                  03/11/13   07/12/13    C.O. FALTER CONSTRUCTION CORP       
                                                            HC-001         -2,500                  01/17/13   07/16/13    KING AND KING MECHANICAL INC        
                                                            PC-001         -2,500                  02/19/13   07/03/13    Ackerman Plumbing, Inc.             
 
22-1282   Reconstruction               7-017-003  05/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          2013 Press Box:
11-0464   New Construction             7-025-001  06/13/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,379                  08/22/13   09/13/13    LandMark Enterprises                
                                                            002            -2,210                  08/22/13   09/13/13    LandMark Enterprises                
                                                            003           -10,000                  10/03/13   11/25/13    LandMark Enterprises                
 

          Sewage Filter Building:
12-1264   New Construction             7-026-001  06/20/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
94-0707EP Energy Project               7-999-E01  02/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE

FULTON CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-05-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Fulton Jr High School:
91-0314   Reconstruction               0-005-002  10/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0470   Reconstruction               0-005-003  11/06/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0999   Reconstruction               0-005-004  04/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0021   Reconstruction               0-005-005  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1607   Additions and Alterations    0-005-006  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            16              9,903                  04/17/03   05/06/03    PAC & Assoc.                        
                                                            17                569                  05/20/03   05/23/03    PAC & Assoc.                        
                                                            19              7,594                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            2              16,072                  01/06/03   03/13/03    Burns Elec.                         
                                                            21              1,913                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            22              1,710                  09/16/03   09/19/03    PAC & Assoc.                        
                                                            5              10,976                  05/20/03   05/23/03    Burns Elec.                         
 
08-0275   Reconstruction               0-005-007  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-W 025             0                  07/15/10   12/02/10    WEYDMAN ELECTRIC INC                
                                                            E-W 033          -854                  08/23/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 034             0                  08/23/10   11/26/10    WEYDMAN ELECTRIC                    
                                                            E-W 039         4,659                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 045       -19,766                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 046        -8,403                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 050           166                  11/17/10   12/01/10    WEYDMAN ELECTRIC INC                
                                                            E-W 055         3,066                  11/17/10   12/01/10    WEYDMAN ELECTRIC INC                
                                                            E-W 063        11,433                  12/13/10   01/13/11    WEYDMAN ELECTRIC INC                
                                                            E-W 064           648                  02/14/11   04/01/11    WEYDMAN ELECTRIC INC                
                                                            E-W 074           838                  01/09/12   09/13/12    WEYDMAN ELECTRIC INC                
                                                            GC-016         -5,500                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-048          1,764                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-097           -790                  08/23/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-107         -3,735                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-125          3,056                  12/13/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-155            340                  01/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-182         -3,702                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-213        -23,096                  07/18/11   08/18/11    PAC & ASSOCIATES INC                
                                                            M-007               0                  11/17/10   12/01/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-010            -340                  02/22/11   03/23/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            P-002               0                  11/20/09   02/05/10    OSWEGO MECHANICAL                   
                                                            P-022           1,493                  08/16/10   11/26/10    OSWEGO MECHANICAL                   
 
09-1123   Reconstruction               0-005-008  04/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-001        -182,200                  10/04/10   10/29/10    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-004               0                  12/02/10   12/28/10    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-005               0                  01/18/11   02/15/11    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-006         -30,896                  01/28/11   02/24/11    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-007             356                  04/28/11   05/20/11    EV ROOFING & CONSTRUCTION SUPPLY    
 
10-0768   Reconstruction               0-005-009  06/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002               0                  12/08/11   09/07/12    WEYDMAN ELECTRIC INC                
                                                            E-012               0                  01/09/12   07/05/12    WEYDMAN ELECTRIC INC                
                                                            E-016            -185                  01/09/12   06/28/13    WEYDMAN ELECTRIC INC                
                                                            E-022         -12,944                  04/11/12   06/28/13    WEYDMAN ELECTRIC INC                
                                                            E-025          26,293                  04/11/12   06/28/13    WEYDMAN ELECTRIC INC                
                                                            E-028           1,132                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
                                                            M-002               0                  02/09/12   01/25/13    J&A MECHANICAL CONTRACTORS INC      
                                                            M-003          -5,000                  08/13/12   07/17/13    J & A Medchanical Contractors, Inc. 
 
10-0689   Reconstruction               0-005-010  06/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1381   Reconstruction               0-005-011  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            011-008        10,521                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-017B        4,499                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
 
15-0779   Reconstruction               0-005-012  12/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1470   Reconstruction               0-005-013  05/19/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  08/26/21   05/06/22    M.E.I.D, LLC                        
                                                            003                 0                  08/26/21   05/06/22    LAN-CO COMPANIES                    
                                                            009            13,519                  10/04/21   11/22/22    Lan-Co Companies                    
                                                            EC-001          5,479                  10/25/21   12/08/22    Northern Pioneer Contractors, Inc   
                                                            EC-002          1,451                  10/25/21   12/08/22    Northern Pioneer Contractors, Inc   
                                                            EC-003          5,432                  11/05/21   12/12/22    Northern Pioneer Contractors, Inc   
                                                            EC-005          5,734                  03/07/22   03/06/23    Northern Pioneer Contrs Inc         
                                                            EC-006         20,742                  03/07/22   03/06/23    Northern Pioneer Contrs Inc         
                                                            EC-007          1,321                  03/07/22   03/06/23    Northern Pioneer Contrs Inc         
                                                            EC-008         -3,417                  03/07/22   03/06/23    Northern Pioneer Contrs Inc         
                                                            GC-002          9,758                  10/25/21   12/08/22    M.E.I.D LLC                         
                                                            GC-003        -13,309                  03/07/22   03/06/23    M.E.I.D LLC                         
                                                            SC-005         30,925                  09/10/21   11/28/22    LeChase Construction Services, LLC  
                                                            SC-006         -3,901                  10/04/21   11/22/22    Lan-Co Companies                    
                                                            SC-007        -30,446                  10/04/21   11/22/22    Lan-Co Companies                    
                                                            SC-010         -9,915                  12/02/21   12/16/22    Lan-Co Comp                         
 
20-0219   Reconstruction               0-005-014  11/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0050FP Reconstruction               0-005-FP1  09/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0020SC Visual Structural Inspection 0-005-SC1  07/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          James E. Lannigan:
97-1000   Reconstruction               0-006-003  04/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0022   Reconstruction               0-006-004  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1608   Reconstruction               0-006-005  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            13             13,383                  06/03/03   06/25/03    PAC & Assoc.                        
                                                            14             34,901                  03/26/03   04/18/03    PAC & Assoc.                        
                                                            20                364                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            5              10,976                  05/20/03   05/23/03    Burns Elec.                         
                                                            6               2,000                  12/12/02   02/18/03    PAC & Assoc.                        
                                                            6               4,232                  05/20/03   05/23/03    NEP Glass                           
 
08-0276   Reconstruction               0-006-006  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-007          18,880                  03/15/10   05/26/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-018           3,140                  10/04/10   11/12/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-024            -760                  10/20/10   01/07/11    JWJ INDUSTRIES dba SEABIRC ENVIRO   
                                                            E-P 003             0                  09/25/09   10/13/09    PATRICIA ELECTRIC INC               
                                                            E-P 005             0                  10/09/09   11/19/09    PATRICIA ELECTRIC INC               
                                                            E-P 006             0                  10/09/09   11/19/09    PATRICIA ELECTRIC INC               
                                                            E-P 008           962                  11/12/09   12/30/09    PATRICIA ELECTRIC INC               
                                                            E-P 009           333                  11/12/09   12/30/09    PATRICIA ELECTRIC INC               
                                                            E-P 010             0                  12/04/09   02/04/10    PATRICIA ELECTRIC INC               
                                                            E-P 013           907                  12/04/09   02/04/10    PATRICIA ELECTRIC INC               
                                                            E-P 016           533                  12/23/09   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 017        -2,628                  12/23/09   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 018          -505                  12/23/09   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 021           490                  12/23/09   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 023           361                  01/15/10   05/27/10    PATRICIA ELECTRIC INC               
                                                            E-P 024             0                  01/25/10   05/27/10    PATRICIA ELECTRIC INC               
                                                            E-P 027             0                  06/01/10   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 029           326                  07/02/10   12/06/10    PATRICIA ELECTRIC INC               
                                                            E-P 031             0                  07/02/10   12/06/10    PATRICIA ELECTRIC INC               
                                                            E-P 044           880                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 051           275                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 053           214                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 054         2,200                  12/02/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 056         4,041                  12/16/10   01/13/11    PATRICIA ELECTRIC INC               
                                                            E-P 058           529                  12/16/10   01/13/11    PATRICIA ELECTRIC INC               
                                                            E-P 064          -437                  03/14/11   04/01/11    PATRICIA ELECTRIC INC               
                                                            E-P 065         1,178                  03/14/11   04/01/11    PATRICIA ELECTRIC INC               
                                                            E-P 067           578                  08/25/11   02/08/12    PATRICIA ELECTRIC INC               
                                                            E-W-001             0                  10/09/09   11/19/09    WEYDMAN ELECTRIC INC                
                                                            GC-001        -75,000                  09/25/09   10/13/09    PAC & ASSOCIATES INC                
                                                            GC-009              0                  10/19/09   11/19/09    PAC & ASSOCIATES INC                
                                                            GC-015              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-027          1,259                  12/04/09   02/04/10    PAC & ASSOCIATES INC                
                                                            GC-029           -900                  12/04/09   02/04/10    PAC & ASSOCIATES INC                
                                                            GC-034              0                  12/23/09   12/17/10    PAC & ASSOCIATES INC                
                                                            GC-036           -350                  12/23/09   12/17/10    PAC & ASSOCIATES INC                
                                                            GC-042         -1,776                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-043          9,004                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-051          2,624                  02/22/10   05/10/10    PAC & ASSOCIATES INC                
                                                            GC-052          1,162                  02/22/10   05/10/10    PAC & ASSOCIATES INC                
                                                            GC-056          4,424                  03/15/10   05/26/10    PAC & ASSOCIATES INC                
                                                            GC-058            785                  04/05/10   06/16/10    PAC & ASSOCIATES INC                
                                                            GC-062         11,182                  06/01/10   12/03/10    PAC & ASSOCIATES, INC.              
                                                            GC-063           -115                  06/01/10   12/03/10    PAC & ASSOCIATES, INC.              
                                                            GC-065          3,737                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-066          6,720                  06/01/10   12/10/10    PAC & ASSOCIATES, INC.              
                                                            GC-067             45                  06/01/10   12/08/10    PAC & ASSOCATES, INC.               
                                                            GC-069          7,859                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-070            520                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-073            457                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-080         -3,385                  07/02/10   12/06/10    PAC & ASSOCIATES INC                
                                                            GC-081          1,530                  07/02/10   12/10/10    PAC & ASSOCIATES INC                
                                                            GC-083 C          271                  07/15/10   12/02/10    PAC & ASSOCIATES INC                
                                                            GC-084B          -210                  07/02/10   12/10/10    PAC & ASSOCIATES INC                
                                                            GC-085          1,470                  12/10/10     /  /      PAC & ASSOCIATES INC                
                                                            GC-086            362                  07/02/10   12/10/10    PAC & ASSOCIATES INC                
                                                            GC-099           -790                  08/23/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-114         -1,842                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-122          1,040                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-123            453                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-126         -2,340                  12/16/10   01/14/11    PAC & ASSOCIATES INC                
                                                            GC-135          1,045                  01/18/11   02/15/11    PAC & ASSOCIATES INC                
                                                            GC-149         13,371                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-167            874                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-173          1,729                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-176            456                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-179         -2,933                  04/04/11   11/05/14    PAC & ASSOCIATES INC                
                                                            GC-190          1,490                  04/06/11   05/06/11    PAC & ASSOCIATES INC                
                                                            GC-191          3,041                  04/28/11   05/20/11    PAC & ASSOCIATES INC                
                                                            GC-192         -2,691                  04/28/11   05/20/11    PAC & ASSOCIATES INC                
                                                            GC-208           -950                  07/08/11   08/17/11    PAC & ASSOCIATES INC                
                                                            GC-215        -17,599                  07/18/11   08/18/11    PAC & ASSOCIATES INC                
                                                            GC-223          1,296                  12/08/11   10/24/12    PAC & ASSOCIATES INC                
                                                            M-001               0                  03/15/10   05/26/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            M-005               0                  06/01/10   12/17/10    AIRTECH HEATING AND AIR CONDITIONING
                                                            M-012            -437                  02/22/11   03/23/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-023          -7,615                  09/19/11   08/03/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-031               0                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            P-007               0                  12/23/09   02/11/10    OSWEGO MECHANICAL                   
                                                            P-009           5,605                  12/23/09   12/17/10    OSWEGO MECHANICAL                   
                                                            P-015             299                  06/01/10   12/17/10    OSWEGO MECHANICAL                   
                                                            P-016           2,661                  07/02/10   12/06/10    OSWEGO MECHANICAL                   
                                                            P-020           1,493                  08/16/10   11/26/10    OSWEGO MECHANICAL                   
                                                            R-001               0                  04/05/10   06/16/10    WELCH CONSTRUCTION INC              
                                                            W-008            -544                  07/08/11   08/17/11    FLOWER CITY GLASS CO INC            
                                                            W-012           2,262                  12/08/11   10/24/12    FLOWER CITY GLASS CO INC            
 
10-0769   Reconstruction               0-006-007  06/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-004               0                  12/08/11   09/07/12    WEYDMAN ELECTRIC INC                
                                                            E-011               0                  01/09/12     /  /      WEYDMAN ELECTRIC INC                
                                                            E-014           3,390                  01/09/12   07/05/12    WEYDMAN ELECTRIC INC                
                                                            E-021           3,220                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
                                                            E-030              22                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
                                                            GC-001              0                  10/28/11   01/06/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-003         -1,290                  12/08/11   07/13/12    PAC & ASSOCIATES OF OSWEGO INC      
 
10-0690   Reconstruction               0-006-008  06/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1382   Reconstruction               0-006-009  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -15,000                  04/23/15   05/11/15    Genesee Environmental LLC           
                                                            001            12,210                  04/23/15   05/11/15    PAC & Associates of Oswego, Inc     
                                                            011-009         4,579                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-017D        4,499                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-018         6,740                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
 
14-0854   Reconstruction               0-006-010  02/17/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001          -119,634                  12/11/15   01/04/16    Apple Roofing Corp.                 
                                                            001           -11,000                  09/02/16   10/04/16    Airside Technology Corporation      
                                                            002                 0                  12/11/15   01/04/16    Apple Roofing Corp.                 
                                                            003                 0                  12/11/15   01/04/16    Apple Roofing Corp.                 
                                                            004           -12,967                  12/11/15   01/04/16    Apple Roofing Corp.                 
 
19-1471   Reconstruction               0-006-011  05/19/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  08/26/21   05/06/22    LAN-CO COMPANIES                    
                                                            002                 0                  08/26/21   05/06/22    LAN-CO COMPANIES                    
                                                            004                 0                  08/26/21   05/06/22    LAN-CO COMPANIES                    
 
20-0220   Reconstruction               0-006-012  11/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1183   Reconstruction               0-006-013  04/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1784   Reconstruction               0-006-014  08/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0046FP Reconstruction               0-006-FP1  09/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1646SC Visual Structural Inspection 0-006-SC1  07/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Phillip Street School:
95-0687   Reconstruction               0-008-002  01/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Granby Elementary School:
99-0023   Reconstruction               0-009-003  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1609   Reconstruction               0-009-004  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            13             13,383                  06/03/03   06/25/03    PAC & Assoc.                        
 
08-0277   Reconstruction               0-009-005  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-031          24,525                  11/16/12   08/16/13    Weydman Electric, Inc.              
                                                            E-W 043         1,038                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 049         4,466                  11/17/10   12/01/10    WEYDMAN ELECTRIC INC                
                                                            E-W 054           967                  11/17/10   12/01/10    WEYDMAN ELECTRIC INC                
                                                            E-W 068           303                  02/14/11   03/10/11    WEYDMAN ELECTRIC INC                
                                                            GC-144          4,431                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-158        -35,800                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-168            659                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-181             87                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-201        -12,675                  07/08/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-216        -57,007                  07/18/11   08/18/11    PAC & ASSOCIATES INC                
                                                            M-028               0                  12/23/12   02/14/14    Airtech Heating and Air Condtioning 
                                                            W-004               0                  07/08/11   08/17/11    FLOWER CITY GLASS CO INC            
                                                            W-016          -8,820                  02/09/12   10/24/12    FLOWER CITY GLASS CO INC            
                                                            q-019           1,493                  08/16/10   11/26/10    OSWEGO MECHANICAL                   
 
10-0770   Reconstruction               0-009-006  06/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-005               0                  12/08/11   09/07/12    WEYDMAN ELECTRIC INC                
                                                            E-010               0                  01/09/12   07/05/12    WEYDMAN ELECTRIC INC                
                                                            E-013               0                  01/09/12   07/05/12    WEYDMAN ELECTRICN INC               
                                                            E-017               0                  01/17/12   04/12/12    WEYDMAN ELECTRIC INC                
                                                            E-024               0                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
                                                            E-027           8,522                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
                                                            GC-002           -259                  12/08/11   07/13/12    PAC & ASSOCIATES OF OSWEGO INC      
 
10-0691   Reconstruction               0-009-007  06/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1383   Reconstruction               0-009-008  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            011-012         1,560                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-017C        4,499                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
 
14-0855   Reconstruction               0-009-009  02/17/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001          -181,250                  09/14/15   09/22/15    EV Roofing & Construction Supply    
                                                            001                 0                  09/02/16   10/04/16    E-Z Paving                          
                                                            001             3,532                  09/02/16   10/04/16    Patricia Electric, Inc.             
                                                            002           -35,000                  09/02/16   10/04/16    EV Roofing & Construction Supply    
                                                            002             2,156                  09/02/16   10/04/16    E-Z Paving                          
                                                            003             6,116                  09/02/16   10/04/16    E-Z Paving                          
                                                            004             9,852                  09/02/16   10/04/16    E-Z Paving                          
                                                            005             2,692                  09/02/16   10/04/16    E-Z Paving                          
                                                            006            -8,405                  09/02/16   10/04/16    E-Z Paving                          
 
15-0780   Reconstruction               0-009-010  12/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1671   Reconstruction               0-009-011  12/15/16  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1785   Reconstruction               0-009-012  08/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0221   Reconstruction               0-009-013  11/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1184   Reconstruction               0-009-014  04/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0048FP Reconstruction               0-009-FP1  09/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Erie Street School:
99-0024   Reconstruction               0-011-001  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1610   Reconstruction               0-011-002  10/01/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0278   Reconstruction               0-011-003  04/09/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fairgrieve Elementary:
92-0645   Additions and Alterations    0-012-003  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0025   Reconstruction               0-012-005  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1611   Reconstruction               0-012-006  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,161                  01/06/03   03/13/03    Burns Elec.                         
                                                            13             13,383                  06/03/03   06/25/03    PAC & Assoc.                        
                                                            14             34,901                  03/26/03   04/18/03    PAC & Assoc.                        
                                                            15              2,208                  03/26/03   04/18/03    PAC & Assoc.                        
                                                            17                569                  05/20/03   05/23/03    PAC & Assoc.                        
                                                            2               7,456                  10/04/02   10/28/02    PAC & Assoc.                        
                                                            20              1,043                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            3               8,379                  12/18/03   12/30/03    Burns Elec.                         
                                                            3              -2,799                  12/15/04   06/23/05    Airside Technologies Corp           
                                                            4              22,156                  12/12/02   02/18/03    PAC & Assoc.                        
                                                            5               8,167                  12/12/02   02/18/03    PAC & Assoc.                        
                                                            5              10,976                  05/20/03   05/23/03    Burns Elec.                         
                                                            6               4,232                  05/20/03   05/23/03    NEP Glass                           
                                                            8              29,192                  01/06/03   03/13/03    PAC & Assoc.                        
                                                            GC-10           3,817                  01/06/03   03/13/03    PAC & Assoc.                        
                                                            GC-7            2,498                  01/06/03   03/13/03    PAC & Assoc.                        
 
08-0279   Reconstruction               0-012-007  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-014           8,860                  08/16/10   11/26/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-017          -5,824                  10/04/10   11/12/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-019           7,430                  10/04/10   11/12/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-023          -4,360                  10/20/10   01/07/11    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-027           4,605                  01/28/11   02/24/11    JWJ INDUSTRIES, INC dba SEABIRD     
                                                            A-028          -3,108                  04/28/11   05/20/11    JWJ INDUSTRIES INC/SEABIRD ENVIRO   
                                                            E-P 032          -473                  07/02/10   12/06/10    PATRICIA ELECTRIC INC               
                                                            E-P 037         2,210                  08/16/10   11/26/10    PATRICIA ELECTRIC INC               
                                                            E-P 042             0                  08/16/10   11/26/10    PATRICIA ELECTRIC INC               
                                                            E-P 043       -79,426                  10/04/10   11/12/10    PATRICIA ELECTRIC INC               
                                                            E-P 045         6,375                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 047        -1,205                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 048           275                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 052         1,098                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 055           396                  12/02/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 057         2,178                  12/16/10   01/13/11    PATRICIA ELECTRIC INC               
                                                            E-P 060         1,355                  12/16/10   01/13/11    PATRICIA ELECTRIC INC               
                                                            E-P 061           305                  01/18/11   02/15/11    PATRICIA ELECTRIC INC               
                                                            GC-100          3,465                  08/30/10   12/09/10    PAC & ASSOCIATES INC                
                                                            GC-119          2,400                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-128          1,387                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-146          2,100                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-166            773                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-183           -783                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-200            612                  07/08/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-209         -7,636                  07/08/11   08/17/11    PAC & ASSOCIATES INC                
                                                            GC-210        -11,640                  07/08/11   08/18/11    PAC & ASSOCIATES INC                
                                                            GC-211         -4,780                  07/08/11     /  /      PAC & ASSOCIATES INC                
                                                            M-009               0                  02/14/11   03/10/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-016               0                  04/06/11   05/06/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-017               0                  04/06/11   05/06/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-018           3,108                  04/06/11   05/06/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-019         -13,393                  09/19/11   08/03/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-020               0                  09/19/11   08/03/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-030           3,903                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            P-018           1,493                  08/16/10   11/26/10    OSWEGO MECHANICAL                   
                                                            P-025          13,389                  11/17/10   12/01/10    OSWEGO MECHANICAL                   
                                                            W-009          -3,141                  08/12/11   09/09/11    FLOWER CITY GLASS CO INC            
 
09-1124   Reconstruction               0-012-008  04/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-002          -9,930                  10/04/10   10/29/10    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-003               0                  12/02/10   12/28/10    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-008             534                  04/28/11   05/20/11    EV ROOFING & CONSTRUCTION SUPPLY    
 
10-0692   Reconstruction               0-012-010  06/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1276   Reconstruction               0-012-011  12/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-004             0                  06/08/16   07/08/16    PAC & ASSOCIATES                    
                                                            002-005             0                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            002-006             0                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            002-007             0                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            002-008             0                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            002-009        13,160                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            002-010         9,476                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            002-011         7,929                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            002-012         9,029                  06/08/16   07/07/16    PAC & ASSOCIATES                    
                                                            003-0011            0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-012          -285                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-016             0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-018             0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-019             0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-020        -3,487                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-021        27,418                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-022          -251                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-024         1,122                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            004                 0                  12/08/14   12/15/14    Patricia Electric Inc.              
                                                            004-001             0                  06/08/16   07/07/16    KIING & KING                        
                                                            004-002         2,457                  06/08/16   07/07/16    KING & KING MECHANICAL              
                                                            004-004         8,916                  06/08/16   07/07/16    KING & KING MECHANICAL              
                                                            004-005         8,271                  06/08/16   07/07/16    KING & KING MECHANICAL              
                                                            004-007         6,862                  06/08/16   07/07/16    KING & KING MECHANICAL              
                                                            004-008         4,166                  06/08/16   07/07/16    KING & KING MECHANICAL              
                                                            005                 0                  12/08/14   12/15/14    Patricia Electric Inc.              
                                                            005-001         1,297                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL SERVICES    
                                                            005-002        13,776                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-003        27,628                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-004        19,945                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-005        12,716                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-006        12,451                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-007        24,411                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-008         6,465                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-009         9,460                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-010         9,870                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-011        10,682                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-012        14,760                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-013         6,358                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-014        16,063                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            005-015        28,444                  05/12/16   05/19/16    HOMEGUARD ENVIRONMENTAL             
                                                            006                 0                  12/08/14   12/15/14    Patricia Electric Inc.              
                                                            006               710                  06/08/16   07/07/16    King & King Mechanical              
                                                            008                 0                  12/08/14   12/15/14    Patricia Electric Inc.              
                                                            009                 0                  12/08/14   12/15/14    Patricia Electric Inc.              
                                                            016             6,958                  09/02/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            017             8,636                  09/02/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            018            18,916                  09/02/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            019             3,864                  09/02/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            021             1,108                  09/02/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            1                   0                  06/26/15   07/21/15    Bellucci Enterprises Inc.           
                                                            1                   0                  06/26/15   07/21/15    PAC & Associates of Oswego, Inc.    
                                                            3                   0                  06/26/15   07/21/15    Patricia Electric Inc.              
 
13-1384   Reconstruction               0-012-012  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-001         6,732                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-005         1,355                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-007         2,431                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-011         1,412                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
 
19-0534   Reconstruction               0-012-013  12/09/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1786   Reconstruction               0-012-014  08/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0222   Reconstruction               0-012-015  11/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0049FP Reconstruction               0-012-FP1  09/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          G. Ray Bodley High School:
92-0646   Additions and Alterations    0-015-004  04/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1277   Reconstruction               0-015-005  12/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001              -362                  04/23/15   05/08/15    Secor Building Solutions            
                                                            001                 0                  07/29/15   10/29/15    RSI Roofing                         
                                                            002                 0                  07/29/15   10/29/15    RSI Roofing                         
                                                            002-013         1,858                  06/08/16   07/08/16    PAC & ASSOCIATES                    
                                                            003            -2,763                  07/29/15   10/29/15    RSI Roofing                         
                                                            003-014             0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            004           -83,500                  07/29/15   10/29/15    RSI Roofing                         
                                                            004-003          -225                  06/08/16   07/07/16    KING & KING MECHANICAL              
                                                            004-009         8,285                  06/08/16   07/07/16    KING & KING MECHANICAL              
                                                            020             5,142                  09/02/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            022               939                  09/02/16   11/21/16    PAC & Associates of Oswego, Inc.    
 
99-0026   Reconstruction               0-015-006  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1612   Additions and Alterations    0-015-007  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              44,446                  10/04/02   10/28/02    PAC & Assoc.                        
                                                            1               8,554                  05/20/03   05/23/03    Airside Technology                  
                                                            1              -8,026                  06/22/04   06/25/04    Brosh Mech.                         
                                                            11             14,717                  01/30/03   02/11/03    PAC & Assoc.                        
                                                            12              9,358                  01/30/03   02/11/03    PAC & Assoc.                        
                                                            13             13,383                  06/03/03   06/25/03    PAC & Assoc.                        
                                                            14             34,901                  03/26/03   04/18/03    PAC & Assoc.                        
                                                            16              9,903                  04/17/03   05/06/03    PAC & Assoc.                        
                                                            18             47,922                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            20              2,079                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            20              7,636                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            23              1,727                  02/03/04   02/20/04    PAC & Assoc.                        
                                                            3              13,506                  10/04/02   10/28/02    PAC & Assoc.                        
                                                            3               9,316                  03/02/04   03/03/04    Burns Elec.                         
                                                            3              -2,799                  12/15/04   06/23/05    Airside technologies Corp           
                                                            4               6,451                  05/20/03   05/23/03    Burns Elec.                         
                                                            5              10,976                  05/20/03   05/23/03    Burns Elec.                         
                                                            6               3,117                  12/12/02   02/18/03    PAC & Assoc.                        
                                                            6              -7,806                  06/22/04   06/25/04    Burns Elec.                         
                                                            8               1,748                  01/08/04   01/16/04    NEP Glass                           
                                                            GC-9           12,941                  01/06/03   03/13/03    PAC & Assoc.                        
 
08-0280   Additions and Alterations    0-015-008  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-001          80,740                  09/25/09   10/09/09    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-002         125,635                  10/09/09   11/19/09    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-003          10,500                  11/12/09   12/30/09    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-004         -27,317                  12/23/09   12/17/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-006           5,888                  03/15/10   05/26/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-009          -3,658                  03/15/10   05/26/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-021          -2,505                  10/20/10   01/07/11    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-022               0                  10/20/10   01/07/11    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-025         -28,000                  11/17/10   12/01/10    JWJ INDUSTRIES dba SEABIRD ENVIRO.  
                                                            E-033          56,243                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            E-W 002             0                  12/04/09   02/04/10    WEYDMAN ELECTRIC INC                
                                                            E-W 003         8,379                  12/04/09   02/04/10    WEYDMAN ELECTRIC INC                
                                                            E-W 004         3,874                  12/23/09   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 005         3,084                  12/23/09   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 006         8,321                  01/15/10   05/27/10    WEYDMAN ELECTRIC INC                
                                                            E-W 007           171                  01/15/10   05/27/10    WEYDMAN ELECTRIC INC                
                                                            E-W 008        -1,661                  01/15/10   05/27/10    WEYDMAN ELECTRIC INC                
                                                            E-W 009             0                  01/15/10   05/27/10    WEYDMAN ELECTRIC INC                
                                                            E-W 012             0                  02/22/10   05/10/10    WEYDMAN ELECTRIC INC                
                                                            E-W 013         2,584                  06/01/10   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 014             0                  06/01/10   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 015       -14,323                  06/01/10   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 016             0                  06/01/10   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 017         1,146                  06/01/10   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 018        14,175                  06/01/10   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 019        47,369                  06/01/10   12/17/10    WEYDMAN ELECTRIC INC                
                                                            E-W 020           605                  07/02/10   12/06/10    WEYDMAN ELECTRIC INC                
                                                            E-W 021          -256                  07/02/10   12/06/10    WEYDMAN ELECTRIC INC                
                                                            E-W 022             0                  07/02/10   12/06/10    WEYDMAN ELECTRIC INC                
                                                            E-W 023             0                  07/15/10   12/02/10    WEYDMAN ELECTRIC INC                
                                                            E-W 024        -1,000                  07/15/10   12/02/10    WEYDMAN ELECTRIC INC                
                                                            E-W 026           436                  07/15/10   12/02/10    WEYDMAN ELECTRIC INC                
                                                            E-W 027             0                  07/15/10   12/02/10    WEYDMAN ELECTRIC INC                
                                                            E-W 028        25,629                  08/16/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 029        23,529                  08/16/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 030            66                  08/16/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 031             0                  08/16/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 032             0                  08/16/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 035         4,998                  08/23/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 036       -12,440                  08/23/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 037         3,957                  08/23/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 038         2,987                  08/23/10   11/26/10    WEYDMAN ELECTRIC INC                
                                                            E-W 040           761                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 041             0                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 042          -283                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 044         2,100                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 047           604                  08/30/10   12/09/10    WEYDMAN ELECTRIC INC                
                                                            E-W 048         4,632                  10/20/10   11/12/10    WEYDMAN ELECTRIC INC                
                                                            E-W 051         2,371                  10/20/10   11/12/10    WEYDMAN ELECTRIC INC                
                                                            E-W 052        14,800                  10/20/10   01/07/11    WEYDMAN ELECTRIC INC                
                                                            E-W 053         3,179                  11/17/10   12/01/10    WEYDMAN ELECTRIC INC                
                                                            E-W 056         5,352                  11/17/10   12/01/10    WEYDMAN ELECTRIC INC                
                                                            E-W 057         4,097                  11/17/10   12/01/10    WEYDMAN ELECTRIC INC                
                                                            E-W 058         7,657                  12/13/10   01/13/11    WEYDMAN ELECTRIC INC                
                                                            E-W 059         4,020                  12/13/10   01/13/11    WEYDMAN ELECTRIC INC                
                                                            E-W 060           601                  12/13/10   01/13/11    WEYDMAN ELECTRIC INC                
                                                            E-W 061         1,996                  12/13/10   01/13/11    WEYDMAN ELECTRIC INC                
                                                            E-W 062         1,768                  12/13/10   01/13/11    WEYDMAN ELECTRIC INC                
                                                            E-W 065         3,027                  02/14/11   03/10/11    WEYDMAN ELECTRIC INC                
                                                            E-W 066           538                  02/14/11   03/10/11    WEYDMAN ELECTRIC INC                
                                                            E-W 067         7,378                  02/14/11   03/10/11    WEYDMAN ELECTRIC INC                
                                                            E-W 069           824                  02/14/11   03/10/11    WEYDMAN ELECTRIC INC                
                                                            E-W 070         2,250                  04/06/11   05/06/11    WEYDMAN ELECTRIC INC                
                                                            E-W 071         1,212                  04/06/11   05/06/11    WEYDMAN ELECTRIC INC                
                                                            E-W 072         8,414                  07/08/11   09/09/11    WEYDMAN ELECTRIC INC                
                                                            E-W 073         5,521                  08/25/11   09/09/11    WEYDMAN ELECTRIC INC                
                                                            E-W 075         5,812                  01/09/12   09/13/12    WEYDMAN ELECTRIC INC                
                                                            E-W-010             0                  02/22/10   05/10/10    WEYDMAN ELECTRIC INC                
                                                            GC-003              0                  09/25/09   10/13/09    PAC & ASSOCAITES INC                
                                                            GC-005              0                  09/25/09   10/09/09    PAC & ASSOCIATES INC                
                                                            GC-006              0                  09/25/09   10/09/09    PAC & ASSOCIATES                    
                                                            GC-007          3,405                  10/19/09   11/19/09    PAC & ASSOCIATES INC                
                                                            GC-017              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-018              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-020              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-021              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-022         27,182                  12/04/09   02/04/10    PAC & ASSOCIATES INC                
                                                            GC-025              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-026              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-028          5,584                  12/04/09   02/04/10    PAC & ASSOCIATES INC                
                                                            GC-030          2,079                  12/04/09   02/04/10    PAC & ASSOCIATES INC                
                                                            GC-031         52,316                  12/23/09   12/17/10    PAC & ASSOCIATES INC                
                                                            GC-032          2,424                  12/23/09   12/17/10    PAC & ASSOCIATES INC                
                                                            GC-033          3,046                  12/23/09   12/17/10    PAC & ASSOCIATES INC                
                                                            GC-037         13,968                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-038              0                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-039            233                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-040         -1,386                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-046           -368                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-050          1,364                  02/22/10   05/10/10    PAC & ASSOCIATES INC                
                                                            GC-053          1,839                  03/15/10   05/26/10    PAC & ASSOCIATES INC                
                                                            GC-054            793                  03/15/10   05/26/10    PAC & ASSOCIATES INC                
                                                            GC-055         -1,561                  03/15/10   05/26/10    PAC & ASSOCIATES INC                
                                                            GC-057         15,266                  04/05/10   06/16/10    PAC & ASSOCIATES INC                
                                                            GC-060         10,631                  06/01/10   12/03/10    PAC & ASSOCIATES, INC.              
                                                            GC-061          8,037                  06/01/10   12/03/10    PAC & ASSOCATES, INC.               
                                                            GC-071          2,663                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-072         15,378                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-075            586                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-076         56,568                  07/02/10   12/06/10    PAC & ASSOCIATES INC                
                                                            GC-077           -260                  07/02/10   12/06/10    PAC & ASSOCIATES INC                
                                                            GC-078          6,528                  07/02/10   12/06/10    PAC & ASSOCIATES INC                
                                                            GC-079           -758                  08/02/10   12/06/10    PAC & ASSOCIATES INC                
                                                            GC-082          1,815                  07/02/10   12/10/10    PAC & ASSOCIATES INC                
                                                            GC-083 D        1,624                  07/15/10   12/02/10    PAC & ASSOCIATES INC                
                                                            GC-084A        -1,500                  07/02/10   12/10/10    PAC & ASSOCIATES INC                
                                                            GC-087              0                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-088            590                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-092              0                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-093          1,961                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-095          4,068                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-096           -742                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-102         11,550                  10/04/10   11/12/10    PAC & ASSOCIATES INC                
                                                            GC-103          8,037                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-104           -112                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-105          3,266                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-106          7,383                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-109          2,988                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-110          3,603                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-111         13,704                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-113          3,243                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-116          3,410                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-117          2,330                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-121          4,190                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-124         -6,447                  12/13/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-127         10,451                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-130          8,219                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-131          8,683                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-132          3,583                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-133          1,323                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-137         11,395                  01/18/11   02/15/11    PAC & ASSOCIATES INC                
                                                            GC-138         -2,297                  01/18/11     /  /      PAC & ASSOCIATES INC                
                                                            GC-139          5,237                  01/18/11   02/15/11    PAC & ASSOCIATES INC                
                                                            GC-140          7,409                  01/18/11   02/15/11    PAC & ASSOCIATES INC                
                                                            GC-141          2,857                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-142          1,570                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-147            542                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-148         10,040                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-150          1,593                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-151         12,392                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-152          2,847                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-153          4,276                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-154            542                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-157         18,882                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-159         13,586                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-160          4,547                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-161          3,410                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-162            420                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-163          1,077                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-169          5,778                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-171          2,420                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-172            576                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-175          2,091                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-178          4,472                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-180          1,500                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-185        -10,508                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-188          7,933                  04/06/11   05/06/11    PAC & ASSOCIATES INC                
                                                            GC-189           -600                  04/06/11   05/06/11    PAC & ASSOCIATES INC                
                                                            GC-193            739                  04/28/11   05/20/11    PAC & ASSOCIATES INC                
                                                            GC-194            933                  04/28/11   05/20/11    PAC & ASSOCIATES INC                
                                                            GC-195          1,494                  04/28/11     /  /      PAC & ASSOCIATES INC                
                                                            GC-196            820                  04/28/11   05/20/11    PAC & ASSOCIATES INC                
                                                            GC-197         -1,838                  05/02/11   05/20/11    PAC & ASSOCIATES INC                
                                                            GC-198            959                  05/02/11   05/20/11    PAC & ASSOCIATES INC                
                                                            GC-199            761                  05/23/11   07/21/11    PAC & ASSOCIATES INC                
                                                            GC-202          1,187                  07/08/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-203            524                  07/08/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-204          2,587                  07/08/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-205         12,629                  07/08/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-206            750                  07/08/11   08/17/11    PAC & ASSOCIATES INC                
                                                            GC-207         -2,003                  07/08/11   08/17/11    PAC & ASSOCIATES INC                
                                                            GC-211         -4,780                  07/08/11   08/18/11    PAC & ASSOCIATES INC                
                                                            GC-217         -2,484                  07/18/11   08/18/11    PAC & ASSOCIATES INC                
                                                            GC-218            235                  08/25/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-219            833                  08/25/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-220              0                  08/25/11   09/09/11    PAC & ASSOCIATES INC                
                                                            GC-221          1,753                  10/28/11   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-226          2,776                  12/08/11   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-227         -3,420                  12/08/11   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-228            910                  12/08/11   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-230        -33,471                  12/27/11   08/22/12    PAC & ASSOCIATES                    
                                                            GC-231          1,825                  01/17/12   08/22/12    PAC & ASSOCIATES INC                
                                                            GC-232         63,000                  02/24/12   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-233         -1,478                  02/24/12   10/24/12    PAC & ASSOCIATES INC                
                                                            M-004               0                  06/01/10   12/08/10    AIRTECH HEATING AND AIR CONDITIONING
                                                            M-006               0                  10/04/10   11/12/10    AIRTECH HEATING/AIR CONDITIONING SYS
                                                            M-008               0                  12/13/10   01/13/11    AIRTECH HEATING AND A/C SYSTEMS INC 
                                                            M-011               0                  02/22/11   03/23/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-013            -576                  04/06/11   05/06/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-014               0                  04/06/11   05/06/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-015               0                  04/06/11   05/06/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-021               0                  09/19/11   08/03/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-024            -313                  10/11/11   08/06/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-026               0                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            M-027               0                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            M-032           5,235                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            P-003               0                  11/20/09     /  /      OSWEGO MECHANICAL                   
                                                            P-004               0                  11/20/09   02/05/10    OSWEGO MECHANICAL                   
                                                            P-005           9,910                  11/20/09   02/05/10    OSWEGO MECHANCIAL                   
                                                            P-006          13,687                  12/23/09   12/17/10    OSWEGO MECHANICAL                   
                                                            P-010               0                  02/25/10   05/27/10    OSWEGO MECHANICAL                   
                                                            P-011           2,665                  03/15/10   05/26/10    OSWEGO MECHANICAL                   
                                                            P-012           8,740                  06/01/10   12/17/10    OSWEGO MECHANICAL                   
                                                            P-017          11,654                  07/15/10   12/02/10    OSWEGO MECHANICAL                   
                                                            P-023           1,493                  08/16/10   11/26/10    OSWEGO MECHANICAL                   
                                                            P-024           3,284                  08/16/10   11/26/10    OSWEGO MECHANICAL                   
                                                            P-026             284                  11/17/10   12/01/10    OSWEGO MECHANICAL                   
                                                            P-027           1,992                  11/17/10   12/01/10    OSWEGO MECHANICAL                   
                                                            P-028          -1,430                  11/17/10   12/01/10    OSWEGO MECHANICAL                   
                                                            P-029          -1,796                  11/17/10   12/01/10    OSWEGO MECHANICAL                   
                                                            P-031          10,308                  12/02/10   01/07/11    OSWEGO MECHANICAL                   
                                                            P-032             848                  01/18/11   02/15/11    OSWEGO MECHANICAL                   
                                                            P-034           2,627                  01/18/11   02/15/11    OSWEGO MECHANICAL                   
                                                            R-002               0                  04/05/10   06/16/10    WELCH CONSTRUCTION INC              
                                                            R-003               0                  06/01/10   12/17/10    WELCH CONSTRUCTION INC              
                                                            R-004          29,479                  06/01/10   12/17/10    WELCH CONSTRUCTION INC              
                                                            R-005             684                  08/23/10   11/26/10    WELCH CONSTRUCTION INC              
                                                            R-006               0                  10/04/10   12/15/10    WELCH CONSTRUCTION INC              
                                                            R-007           6,179                  10/04/10   12/15/10    WELCH CONSTRUCTION INC              
                                                            R-008           5,563                  11/17/10   12/01/10    WELCH CONSTRUCTION INC              
                                                            R-009           3,578                  11/17/10   12/01/10    WELCH CONSTRUCTION INC              
                                                            R-010             666                  12/02/10   01/07/11    WELCH CONSTRUCTION INC              
                                                            R-011           4,501                  02/22/11   03/23/11    WELCH CONSTRUCTION INC              
                                                            R-012            -284                  02/28/11   03/28/11    WELCH CONSTRUCTION INC              
                                                            R-013             464                  02/28/11   03/28/11    WELCH CONSTRUCTION INC              
                                                            R-014          -2,066                  04/28/11   05/20/11    WELCH CONSTRUCTION INC              
                                                            R-015               0                  05/23/11   07/21/11    WELCH CONSTRUCTION INC              
                                                            R-016           4,765                  05/23/11   07/21/11    WELCH CONSTRUCTION INC              
                                                            R-017             398                  12/08/11   10/24/12    WELCH CONSTRUCTION INC              
                                                            R-018           1,722                  12/27/11   08/22/12    WELCH CONSTRUCTION                  
                                                            R-019           6,238                  12/27/11   08/22/12    WELCH CONSTRUCTION                  
                                                            R-020           9,296                  03/15/12   10/24/12    WELCH CONSTRUCTION INC              
                                                            SC-001         24,608                  12/23/09   12/17/10    ROBERT H LAW INC                    
                                                            SC-002              0                  02/22/10   05/10/10    ROBERT H LAW INC                    
                                                            SC-003              0                  02/22/10   05/10/10    ROBERT H LAW INC                    
                                                            SC-004              0                  07/02/10   12/06/10    ROBERT H LAW INC                    
                                                            SC-005              0                  07/02/10   12/06/10    ROBERT H LAW INC                    
                                                            SC-006          3,009                  07/15/10   12/02/10    ROBERT H. LAW INC                   
                                                            SC-007           -592                  07/15/10   12/02/10    ROBERT H. LAW INC                   
                                                            SC-008              0                  07/15/10   12/02/10    ROBERT H. LAW INC                   
                                                            SC-009              0                  07/15/10   12/02/10    ROBERT H. LAW INC                   
                                                            SC-010         13,535                  06/15/10   12/02/10    ROBERT H. LAW INC                   
                                                            SC-011          2,000                  08/16/10   11/26/10    ROBERT H LAW INC                    
                                                            SC-012         27,105                  10/04/10   11/12/10    ROBERT H. LAW INC                   
                                                            SC-013         20,988                  11/17/10   12/01/10    ROBERT H LAW INC                    
                                                            SC-014         14,295                  12/02/10   01/07/11    ROBERT H LAW INC                    
                                                            SC-015              0                  01/28/11   02/24/11    ROBERT H LAW INC                    
                                                            SC-016              0                  01/28/11   02/24/11    ROBERT H LAW INC                    
                                                            SC-017              0                  01/28/11   02/24/11    ROBERT H LAW INC                    
                                                            SC-018         -4,215                  01/28/11   02/24/11    ROBERT H LAW INC                    
                                                            SC-019              0                  02/22/11   03/23/11    ROBERT H LAW INC                    
                                                            SC-020         12,563                  04/06/11   05/06/11    ROBERT H LAW INC                    
                                                            SC-021        -12,236                  04/28/11   05/20/11    ROBERT H LAW INC                    
                                                            SC-022          2,602                  05/02/11   05/20/11    ROBERT H LAW INC                    
                                                            SC-023         -3,660                  05/02/11   05/20/11    ROBERT H LAW INC                    
                                                            SC-024              0                  05/11/11   07/21/11    ROBERT H LAW INC                    
                                                            SC-025        -63,152                  05/11/11   07/21/11    ROBERT H LAW INC                    
                                                            SC-026         -2,678                  08/25/11   02/10/12    ROBERT H LAW, INC                   
                                                            W-001         -73,144                  09/25/09   10/09/09    FLOWER CITY GLASS CO INC            
                                                            W-002          26,614                  01/15/10   05/27/10    FLOWER CITY GLASS CO INC            
                                                            W-003               0                  07/08/11   08/17/11    FLOWER CITY GLASS O INC             
                                                            W-006               0                  07/08/11   08/17/11    FLOWER CITY GLASS CO INC            
                                                            W-007               0                  07/08/11   08/17/11    FLOWER CITY GLASS CO INC            
                                                            W-010          -5,224                  08/12/11   09/09/11    FLOWER CITY GLASS CO INC            
                                                            W-011           6,677                  12/08/11   10/24/12    FLOWER CITY GLASS CO INC            
                                                            W-014          -1,755                  12/08/11   10/24/12    FLOWER CITY GLASS CO INC            
                                                            W-015           2,074                  12/27/11   08/22/12    FLOWER CITY GLASS                   
                                                            W-017          -1,575                  02/09/12   10/24/12    FLOWER CITY GLASS CO INC            
 
10-0771   Reconstruction               0-015-009  06/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E-006               0                  01/09/12   07/05/12    WEYDMAN ELECTRIC INC                
                                                            E-007           5,880                  01/09/12   07/05/12    WEYDMAN ELECTRIC INC                
                                                            E-008               0                  01/09/12   07/05/12    WEYDMAN ELECTRIC INC                
                                                            E-019               0                  01/17/12   04/12/12    WEYDMAN ELECTRIC INC                
                                                            E-023          12,936                  04/11/12   01/10/13    WEYDMAN ELECTRIC INC                
                                                            E-026           1,058                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
                                                            E-029           1,132                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
                                                            M-001               0                  02/09/12   01/25/13    J&A MECHANICAL CONTRACTORS INC      
 
10-0693   Reconstruction               0-015-010  06/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1385   Reconstruction               0-015-011  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            011-001           632                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-002         1,688                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-003         4,223                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-004         9,054                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-005         5,545                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-006         1,316                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-007        12,736                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-010         7,659                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-011         6,020                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-013        14,608                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-014         8,736                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-015         6,764                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-016         1,802                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
                                                            011-017A        4,499                  07/20/17   07/28/17    PAC & Associates of Oswego, Inc.    
 
15-0781   Reconstruction               0-015-012  12/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1672   Reconstruction               0-015-013  12/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            Ph5GC-01            0                  11/24/17   12/15/17    Bacon & Seiler Constructors Inc.    
                                                            Ph5MC-01      -10,000                  05/08/18   06/04/18    HMI Mechanical Systems, Inc.        
 
20-1790   Reconstruction               0-015-014  07/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          8,103                  11/17/22   08/10/23    ROMBOUGH ELECTRIC INC               
                                                            EC-002              0                  11/17/22   08/10/23    ROMBOUGH ELECTRIC INC               
                                                            EC-003            444                  09/18/23     /  /      ROMBOUGH ELECTRIC INC               
                                                            GC-001              0                  09/14/22   08/15/23    McGinnis Nelson Const Inc           
                                                            MC-001              0                  02/06/23   11/29/23    C&S COMPANIES                       
                                                            MC-002              0                  08/21/23     /  /      C&S COMPANY                         
                                                            SC-001              0                  08/29/22   08/22/23    Shawn Malone Excavatg Inc           
                                                            SC-002              0                  08/29/22   08/22/23    Shawn Malone Excavating Inc         
                                                            SC-003         13,656                  09/19/22   11/07/23    LeChase Const Servs LLC             
                                                            SC-004         -1,683                  02/06/23   12/18/23    SHAWN MALONE EXCAVATING INC         
 
20-0223   Reconstruction               0-015-015  11/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1185   Reconstruction               0-015-016  04/19/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          9,082                  01/10/22   11/08/22    Patricia Elec Inc                   
                                                            EC-002              0                  11/17/22   08/10/23    PATRICIA ELECTRIC INC               
 
21-1787   Reconstruction               0-015-017  08/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2451FA Reconstruction               0-015-018  07/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0047FP Reconstruction               0-015-FP1  09/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0812SC Visual Structural Inspection 0-015-SC1  02/24/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1209SC Visual Structural Inspection 0-015-SC2  04/28/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1645SC Visual Structural Inspection 0-015-SC3  07/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Volney Elementary:
97-1001   Reconstruction               0-017-004  04/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0027   Reconstruction               0-017-005  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1613   Reconstruction               0-017-006  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            13             13,383                  06/03/03   06/25/03    PAC & Assoc.                        
                                                            15              2,208                  03/26/03   04/18/03    PAC & Assoc.                        
                                                            19                856                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            20              4,090                  08/11/03   08/26/03    PAC & Assoc.                        
                                                            21              2,757                  08/11/03   08/26/03    PAC & Assoc.                        
 
08-0281   Reconstruction               0-017-007  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-012           3,150                  08/16/10   11/23/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-015          19,800                  08/16/10   11/23/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-016          20,200                  10/04/10   11/12/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-026           7,670                  11/17/10   12/01/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            E-P 033        -1,010                  07/02/10   12/06/10    PATRICIA ELECTRIC INC               
                                                            E-P 035           -85                  07/15/10   12/02/10    PATRICIA ELECTRIC INC               
                                                            E-P 041         4,763                  08/16/10   11/23/10    PATRICIA ELECTRIC INC               
                                                            E-P 046           -55                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 050           275                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 062           268                  02/14/11   03/10/11    PATRICIA ELECTRIC INC               
                                                            GC-083 B          150                  07/15/10   12/02/10    PAC & ASSOCIATES INC                
                                                            GC-098         -1,480                  08/23/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-108         -2,340                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-112         10,328                  10/20/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-115         -2,131                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-118          3,318                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-134            570                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-145            185                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-184        -10,168                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-212         -4,597                  07/08/11   08/17/11    PAC & ASSOCIATES INC                
                                                            GC-224         -2,442                  12/08/11   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-229             58                  12/27/11   08/22/12    PAC & Assciates, Inc.               
                                                            M-029               0                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            P-021           1,493                  08/16/10   11/23/10    OSWEGO MECHANICAL                   
                                                            W-005               0                  07/08/11   08/17/11    FLOWER CITY GLASS CO INC            
                                                            W-013               0                  12/08/11   10/24/12    FLOWER CITY GLASS CO INC            
 
10-0772   Reconstruction               0-017-008  06/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-003               0                  12/08/11   09/07/12    WEYDMAN ELECTRIC INC                
                                                            E-018               0                  01/17/12   04/12/12    WEYDMAN ELECTRIC INC                
                                                            E-020          -1,400                  04/11/12   10/05/12    WEYDMAN ELECTRIC INC                
 
10-0694   Reconstruction               0-017-009  06/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1278   Reconstruction               0-017-010  12/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -90,700                  12/08/14   12/15/14    E V Roofing & Construction Supply   
                                                            002                 0                  12/08/14   12/15/14    E V Roofing & Construction Supply   
                                                            002-003             0                  06/08/16   07/08/16    PAC & ASSOCIATES                    
                                                            003                 0                  12/08/14   12/15/14    E V Roofing & Construction Supply   
                                                            003-010             0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-013             0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-015             0                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-017        -6,542                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            003-023        -1,322                  06/08/16   07/08/16    PATRICIA ELECTRIC                   
                                                            004                 0                  12/08/14   12/15/14    E V Roofing & Construction Supply   
                                                            004                 0                  12/08/14   12/15/14    Bellucci Enterprises Inc.           
                                                            005           -34,634                  12/08/14   12/15/14    E V Roofing & Construction Supply   
                                                            005               326                  12/08/14   12/15/14    Bellucci Enterprises Inc.           
                                                            007                 0                  12/08/14   12/15/14    Patricia Electric Inc.              
                                                            015             8,964                  09/02/16   11/13/17    PAC & Associates of Oswego, Inc.    
                                                            1                   0                  06/26/15   07/21/15    Patricia Electric Inc.              
                                                            1                   0                  06/26/15   07/21/15    Jag Environmental, LLC              
                                                            2                   0                  06/26/15   07/21/15    Bellucci Enterprises Inc.           
                                                            2                   0                  06/26/15   07/21/15    PAC & Associates of Oswego Inc.     
                                                            2                   0                  06/26/15   07/21/15    Patrcia Electric Inc.               
                                                            2             -10,588                  06/26/15   07/21/15    Jag Environmental, LLC              
                                                            3                   0                  06/26/15   07/21/15    Bellucci Enterprises Inc.           
 
13-1386   Reconstruction               0-017-011  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-008         2,337                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-009         6,986                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-013           975                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
 
19-1472   Reconstruction               0-017-012  05/19/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-004          4,221                  11/05/21   12/12/22    Northern Pioneer Contractors, Inc   
                                                            SC-008        -24,441                  10/04/21   11/22/22    Lan-Co Companies                    
 
20-0224   Reconstruction               0-017-013  11/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1788   Reconstruction               0-017-014  08/04/22  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0032FP Reconstruction               0-017-FP1  09/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1647SC Visual Structural Inspection 0-017-SC1  07/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Education Center:
12-1279   Reconstruction               0-018-003  12/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -7,000                  12/08/14   12/15/14    Syracuse Scenery & Stage Lighting Co
                                                            002-014          -650                  06/08/16   07/08/16    PAC & ASSOCIATES                    
 
99-0028   Reconstruction               0-018-004  12/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1614   Reconstruction               0-018-005  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,934                  01/30/03   02/11/03    NEP Glass Company                   
                                                            2              14,329                  01/30/03   02/20/03    NEP Glass Company                   
                                                            2               1,481                  05/20/03   05/23/03    Airside Tech.                       
                                                            3               6,382                  01/31/03   02/19/03    NEP Glass Company                   
                                                            4               9,522                  01/31/03   02/19/03    NEP Glass Company                   
                                                            5               5,439                  01/31/03   02/19/03    NEP Glass Company                   
                                                            7               1,169                  05/20/03   05/23/03    NEP Glass Company                   
                                                            9              -1,161                  03/30/04   04/06/04    NEP Glass Company                   
 
08-0282   Additions and Alterations    0-018-006  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-005           8,787                  03/15/10   05/26/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-008          30,350                  03/15/10   05/26/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            A-010           3,573                  04/05/10   06/16/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-011           1,599                  08/16/10   11/26/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-013           1,010                  08/16/10   11/26/10    JWJ INDUSTRIES dba SEABIRD ENVIRO   
                                                            A-020         -20,400                  10/04/10   11/12/10    JWJ INDUSTRIES/SEABIRD ENVIRONMENTAL
                                                            E-P 001             0                  09/25/09   10/09/09    PATRICIA ELECTRIC INC               
                                                            E-P 002             0                  09/25/09   10/09/09    PATRICIA ELECTRIC INC               
                                                            E-P 004          -494                  09/25/09   10/09/09    PATRICIA ELECTRIC INC               
                                                            E-P 007         2,027                  10/09/09   11/19/09    PATRICIA ELECTRIC INC               
                                                            E-P 011         2,500                  12/04/09   02/04/10    PATRICIA ELECTRIC INC               
                                                            E-P 012           728                  12/04/09   02/04/10    PATRICIA ELECTRIC INC               
                                                            E-P 014        -1,991                  12/04/09   02/04/10    PATRICIA ELECTRIC INC               
                                                            E-P 015        13,764                  12/04/09   02/04/10    PATRICIA ELECTRIC INC               
                                                            E-P 019             0                  12/23/09   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 020             0                  12/23/09   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 022           493                  12/23/09   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 025             0                  03/15/10   05/26/10    PATRICIA ELECTRIC INC               
                                                            E-P 026             0                  04/05/10   06/16/10    PATRICIA ELECTRIC INC               
                                                            E-P 028        -3,826                  06/01/10   12/17/10    PATRICIA ELECTRIC INC               
                                                            E-P 030             0                  07/02/10   12/06/10    PATRICIA ELECTRIC INC               
                                                            E-P 034             0                  07/15/10   12/02/10    PATRICIA ELECTRIC INC               
                                                            E-P 036           296                  08/16/10   11/26/10    PATRICIA ELECTRIC INC               
                                                            E-P 038         1,401                  08/16/10   11/26/10    PATRICIA ELECTRIC INC               
                                                            E-P 039         4,612                  08/16/10   11/26/10    PATRICIA ELECTRIC INC               
                                                            E-P 040             0                  08/16/10   11/26/10    PATRICIA ELECTRIC INC               
                                                            E-P 049           458                  10/20/10   01/07/11    PATRICIA ELECTRIC INC               
                                                            E-P 059           843                  12/16/10   01/13/11    PATRICIA ELECTRIC INC               
                                                            E-P 063           219                  03/14/11   04/01/11    PATRICIA ELECTRIC INC               
                                                            E-P 066         3,963                  04/28/11   05/20/11    PATRICIA ELECTRIC INC               
                                                            GC-001         10,500                  10/04/10     /  /      PAC & ASSOCIATES INC                
                                                            GC-002              0                  09/25/09   11/10/09    PAC & ASSOCIATES INC                
                                                            GC-004              0                  09/25/09   10/09/09    PAC & ASSOCIATES                    
                                                            GC-008            415                  10/19/09   11/19/09    PAC & ASSOCIATES INC                
                                                            GC-010              0                  10/09/09   11/19/09    PAC & ASSOCIATES INC                
                                                            GC-011              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-012              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-013              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-019              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-023              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-024         34,760                  12/04/09   02/04/10    PAC & ASSOCIATES INC                
                                                            GC-035          4,598                  12/23/09   12/17/10    PAC & ASSOCIATES INC                
                                                            GC-041          2,653                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-044          7,265                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-045          1,201                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-047         -5,313                  01/25/10   05/27/10    PAC & ASSOCIATES INC                
                                                            GC-049            904                  02/22/10   05/10/10    PAC & ASSOCIATES INC                
                                                            GC-059          2,353                  04/05/10   06/16/10    PAC & ASSOCIATES INC                
                                                            GC-064          1,615                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-068         -2,773                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-074            251                  06/01/10   12/08/10    PAC & ASSOCIATES, INC.              
                                                            GC-083 A        1,232                  07/15/10   12/02/10    PAC & ASSOCIATES INC                
                                                            GC-089         10,353                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-090          3,049                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-091              0                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-094         11,089                  08/16/10   11/26/10    PAC & ASSOCIATES INC                
                                                            GC-101         10,500                  10/04/10   11/12/10    PAC & ASSOCIATES INC                
                                                            GC-120          5,157                  12/02/10   01/07/11    PAC & ASSOCIATES INC                
                                                            GC-129        -20,000                  12/16/10   01/13/11    PAC & ASSOCIATES INC                
                                                            GC-136            315                  01/18/11   02/15/11    PAC & ASSOCIATES INC                
                                                            GC-143          1,445                  01/28/11   02/24/11    PAC & ASSOCIATES INC                
                                                            GC-156        -19,942                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-164          5,442                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
                                                            GC-170            718                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-174             64                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-177          2,653                  02/28/11   03/28/11    PAC & ASSOCIATES INC                
                                                            GC-186          9,070                  04/04/11   04/29/11    PAC & ASSOCIATES INC                
                                                            GC-187          5,262                  04/06/11   05/06/11    PAC & ASSOCIATES INC                
                                                            GC-214        -17,500                  07/18/11   08/18/11    PAC & ASSOCIATES INC                
                                                            GC-222         -2,035                  10/28/11   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-225           -939                  12/08/11   10/24/12    PAC & ASSOCIATES INC                
                                                            GC-234         -1,057                  02/24/12   10/24/12    PAC & ASSOCIATES INC                
                                                            M-002               0                  06/01/10   12/08/10    AIRTECH HEATING AND AIR CONDITIONING
                                                            M-003               0                  06/01/10   12/08/10    AIRTECH HEATING AND AIR CONDITIONING
                                                            M-022               0                  09/19/11   08/03/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            M-025          -1,705                  12/23/12   02/14/14    Airtech Heating and Air Conditioning
                                                            P-001               0                  11/20/09   02/05/10    OSWEGO MECHANICAL                   
                                                            P-008          -2,546                  12/23/09   12/17/10    OSWEGO MECHANICAL                   
                                                            P-013          -2,590                  06/01/10   12/17/10    OSWEGO MECHANICAL                   
                                                            P-014               0                  06/01/10   12/17/10    OSWEGO MECHANICAL                   
                                                            P-030           6,452                  11/17/10   12/01/10    OSWEGO MECHANICAL                   
                                                            P-033           1,882                  01/18/11   02/15/11    OSWEGO MECHANICAL                   
 
10-0773   Reconstruction               0-018-007  06/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001               0                  12/08/11   09/07/12    WEYDMAN ELECTRIC INC                
                                                            E-009               0                  01/09/12     /  /      WEYDMAN ELECTRIC INC                
                                                            E-015            -185                  01/09/12   06/28/13    WEYDMAN ELECTRIC INC                
 
10-0695   Reconstruction               0-018-008  06/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1387   Reconstruction               0-018-009  04/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-002         1,129                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-003        10,099                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-004         3,020                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-006         1,126                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-010         4,628                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-012           379                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
                                                            002-014        -1,436                  05/05/17   05/18/17    PAC & Associates of Oswego, Inc.    
 
15-0782   Reconstruction               0-018-010  12/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0225   Reconstruction               0-018-013  11/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0646   Reconstruction               0-018-015  11/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Storage Building:
11-1089   New Construction             2-026-001  04/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003-001          -362                  06/19/17   09/14/17    Secor Building Solutions            
 

          Athletic Complex:
08-0283   Reconstruction               7-002-001  04/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-W 011             0                  02/22/10   05/10/10    WEYDMAN ELECTRIC INC                
                                                            GC 07           1,502                  10/19/09   11/19/09    PAC & Assoc.                        
                                                            GC-014              0                  11/12/09   12/30/09    PAC & ASSOCIATES INC                
                                                            GC-083 E          930                  07/15/10   12/02/10    PAC & ASSOCIATES INC                
                                                            GC-165            560                  02/22/11   03/23/11    PAC & ASSOCIATES INC                
 

          District-Wide:
97-1002   Reconstruction               7-999-001  04/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0244   Reconstruction               7-999-004  11/20/20  NO CHANGE ORDERS ON ELECTRONIC FILE

HANNIBAL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-07-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
91-0149   Reconstruction               0-002-003  08/27/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1470   Reconstruction               0-002-004  06/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1206   Reconstruction               0-002-005  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1141   Reconstruction               0-002-006  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1409   Reconstruction               0-002-008  07/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1126   Additions and Alterations    0-002-009  05/08/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-2           25,724                  01/07/03   01/14/03    PAC& Associates of Oswego           
 
99-0295   Reconstruction               0-002-011  12/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0382   Additions and Alterations    0-002-012  05/13/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            52,649                  12/27/05   04/12/06    MEC Electric                        
                                                            E-2            -3,223                  12/27/05   01/19/06    MEC Electric                        
                                                            E-3             3,200                  12/27/05   01/19/06    MEC Electric                        
                                                            G-1               119                  03/10/06     /  /      RJ ortlieb Contractors              
                                                            G-1                 0                  08/18/08   12/12/08    R. J. ORTLIEB CONSTRUCTION CO., INC.
                                                            G-2            -3,376                  03/10/06     /  /      RJ ortlieb Construction             
                                                            G-2                 0                  08/18/08   01/28/09    R. J. ORTIEB CONSTRUCTIN CO., INC.  
                                                            G-3           -43,372                  03/29/06     /  /      RJ ortlieb Constructin              
                                                            HV-1          -18,125                  12/27/05   01/19/06    M and N Plumbing and Heating        
                                                            HV-2           19,930                  12/27/05     /  /      M and N Plumbing Heating            
                                                            HV-3            4,057                  12/27/05   01/19/06    M and N Plumbing Heating            
                                                            P-1           -11,300                  12/27/05   01/19/06    HMI mechanical Systems              
                                                            R-1               315                  03/22/06   06/30/06    Central City roofing                
                                                            R-2               315                  03/22/06   06/30/06    Central City Roofing                
                                                            S-2            25,032                  03/22/06   06/30/06    The Barber Corp                     
                                                            S-3             6,882                  03/22/06   06/30/06    The barber Corp                     
                                                            S-4               660                  03/22/06   06/30/06    The barber Corp                     
                                                            s-1            69,500                  12/27/05   04/12/06    The barber Corp                     
 
09-0336   Reconstruction               0-002-013  02/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001               0                  11/19/12   08/16/13    KNAPP ELECTRIC INC                  
                                                            E-002               0                  11/19/12   08/16/13    KNAPP ELECTRIC INC                  
                                                            E-004               0                  12/05/12   08/16/13    KNAPP ELECTRIC INC                  
                                                            E-005               0                  12/05/12   08/16/13    KNAPP ELECTRIC INC                  
                                                            E-008         -36,543                  11/25/13   02/07/14    KNAPP ELECTRIC,INC.                 
                                                            GC-10               0                  11/19/12   03/08/13    E.L. AMES INC (R.J. ORTLIEB)        
                                                            GC-12               0                  11/19/12   03/08/13    E.L. AMES INC (R.J. ORTLIEB)        
                                                            GC-13               0                  11/19/12   03/08/13    E.L. AMES INC (R.J.ORTLIEB)         
                                                            GC-14               0                  11/19/12   03/08/13    E.L. AMES INC (R.J. ORTLIEB)       2
                                                            GC-15          -4,145                  03/22/13   03/22/13    E.L. AMES INC (R.J. ORTLIEB)        
                                                            GC-16          -1,951                  03/22/13   03/22/13    E.L. AMES INC (R.J. ORTLIEB)        
                                                            GC-17         -60,341                  03/22/13   03/22/13    E.L. AMES INC (R.J. ORTLIEB)        
                                                            GC-18          -9,000                  03/22/13   03/22/13    E.L. AMES INC (R.J. ORTLIEB)        
                                                            GC-2                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST.) 
                                                            GC-3                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST.) 
                                                            GC-4                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST.) 
                                                            GC-5                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST.) 
                                                            GC-6                0                  11/19/12   03/08/13    E.L. AMES INC (R.J. ORTLIEB CONSTR) 
                                                            GC-9                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST)  
                                                            H-1                 0                  11/19/12   08/16/13    HMI Mechanical Systems, Inc.        
                                                            H-4           -46,975                  12/17/12   07/03/13    HMI Mechanical Systems, Inc.        
                                                            P-1                 0                  11/19/12   07/16/13    Brosh Mechancial Inc.               
                                                            P-10            8,965                  12/17/12   08/09/13    Brosh Mechanical, Inc.              
                                                            P-12            9,178                  12/17/12   08/09/13    Brosh Mechancial, Inc.              
                                                            P-6                 0                  11/19/12   08/16/13    Brosh Mechanical Inc.               
                                                            P-7                 0                  12/17/12   08/09/13    Brosh Mechanical Inc.               
                                                            S-3            21,813                  12/17/10   01/06/11    LAN-CO COMPANIES INC                
                                                            S-6                 0                  11/19/12   03/08/13    LAN-CO COMPANIES INC                
                                                            S-8                 0                  11/19/12   03/08/13    LAN-CO COMPANIES INC                
                                                            S-9                 0                  11/19/12   03/08/13    LAN-CO COMPANIES INC                
                                                            TEC-1          -3,749                  11/19/12   07/03/13    SYRACUSE SCENERY & STAGE LIGHTING CO
 
11-0747   Reconstruction               0-002-014  07/05/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001               0                  01/27/14   02/20/14    Weydman Electric, Inc.              
                                                            GC-001         34,440                  02/07/14   03/05/14    Bouley Associates, Inc.             
                                                            GC-002              0                  01/09/14   02/06/14    Bouley Associates, Inc.             
                                                            GC-004              0                  01/09/14   02/06/14    Bouley Associates, Inc.             
                                                            H-001               0                  01/09/14   02/06/14    HMI Mechanical Systems, Inc.        
                                                            M-001            -355                  01/09/14   02/06/14    Heritage Masonry Restoration, Inc.  
                                                            P-001               0                  01/09/14   02/06/14    HMI Mechanical Systems, Inc.        
                                                            RC-001        -11,673                  01/09/14   02/06/14    Welch Construction, Inc.            
                                                            S-001         -23,484                  01/09/14   02/06/14    Adhan Piping Co, Inc.               
 
14-1632   Reconstruction               0-002-015  07/01/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01            -612                  04/25/16   05/04/16    Bouley Associates, Inc.             
                                                            GC-02           4,753                  04/25/16   05/04/16    Bouley Associates, Inc.             
                                                            RC-01          -3,500                  04/25/16   05/04/16    Diamond Roofing Co., Inc.           
 
18-0048   Reconstruction               0-002-016  01/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-02               0                  10/24/19   10/25/19    C&S TECHNICAL RESOURCES INC.        
                                                            HC-05               0                  10/24/19   10/25/19    C&S TECHNICAL RESOURCES INC.        
                                                            HC-06               0                  10/24/19   10/25/19    C&S TECHNICAL RESOURCES INC.        
                                                            MR-03         -16,122                  12/16/20   03/03/21    LUPINI CONSTRUCTION                 
                                                            PC-09               0                  09/03/21   05/24/22    SIRACUSA MECHANANIAL INC            
                                                            RC-07         -39,771                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-08               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-12               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-16               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-17               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-18               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-19               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-20               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-21               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-22               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-23        -166,346                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            SC-01               0                  10/24/19   10/31/19    R.H. LAW INC.                       
                                                            SC-02               0                  10/24/19   10/31/19    R.H. LAW INC.                       
                                                            SC-03               0                  10/24/19   10/31/19    R.H. LAW INC.                       
                                                            SC-04               0                  10/24/19   10/31/19    R.H. LAW INC.                       
                                                            SC-07               0                  11/22/19   12/04/19    R.H. LAW, INC.                      
                                                            SC-12          -9,800                  12/16/20   03/03/21    R.H. LAW, INC.                      
                                                            SC-14         -94,568                  12/16/20   03/03/21    R.H. LAW, INC.                      
 
19-0490   Reconstruction               0-002-017  01/17/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-02               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-03               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-04               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-05               0                  07/26/22   10/05/23    Pac & Assocs                        
                                                            GC-06               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-07               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-08               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-09          -1,675                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-10               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-11               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-12          -1,797                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-13            -956                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-14               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-15               0                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-16               0                  07/26/22   10/05/23    PAC Assocs                          
                                                            GC-17               0                  07/26/22   10/05/23    PAC Assocs                          
                                                            GC-18         -15,084                  07/26/22   10/05/23    PAC & Assocs                        
                                                            GC-19         -15,084                  07/26/22   10/05/23    PAC & Assocs                        
 
20-1058   Reconstruction               0-002-018  03/05/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         27,705                  09/03/21   06/02/22    CHARLES CRISCOLL MAS RESTORATION    
                                                            GC-002            -50                  09/03/21   06/07/22    CHARLES DRISCOLL MASONRY RESTORATION
 
21-0876   Reconstruction               0-002-020  01/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -8,315                  06/27/22   04/04/23    Bacon&Seller Const Inc              
 
21-1865FC Reconstruction               0-002-021  07/27/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1498FA Reconstruction               0-002-022  03/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0037FA Reconstruction               0-002-023  09/19/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1796FP Reconstruction               0-002-FP1  05/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fairley Elementary:
90-1599   Reconstruction               0-003-003  05/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0150   Reconstruction               0-003-004  08/27/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1471   Reconstruction               0-003-005  06/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1142   Reconstruction               0-003-006  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1198   Reconstruction               0-003-007  05/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1113   Reconstruction               0-003-008  03/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1410   Reconstruction               0-003-009  07/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1769SR Additions and Alterations    0-003-010  06/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0055   Additions and Alterations    0-003-010  01/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AA-2           25,010                  11/14/03   11/17/03    Hazardous Abatement                 
                                                            AA-4            4,241                  11/26/03   12/26/03    Hazardous Abatement                 
                                                            D-1             1,925                  11/18/03   12/26/03    BR Johnson                          
                                                            D-2               275                  11/18/03   12/26/03    BR Johnson                          
                                                            D-5               850                  11/26/03   12/26/03    BR Johnson                          
                                                            D-7             3,607                  11/12/04   12/06/04    BR Johnson                          
                                                            E-1             2,482                  01/07/03   01/16/03    Ridley Electric                     
                                                            E-3             1,075                  01/14/03   02/10/03    Ridley Electric                     
                                                            E-4             5,199                  01/14/03   02/12/03    Ridley Electric                     
                                                            E-5            -9,218                  05/27/04   06/09/04    Ridley Electric                     
                                                            E-6           -11,046                  05/27/04   06/09/04    Ridley Electric                     
                                                            E12                 0                  09/02/05   10/06/05    Ridley Electric Co                  
                                                            E15            19,318                  09/02/05   10/05/05    Ridley Electric                     
                                                            E16             1,044                  11/04/05   11/23/05    RIDLEY ELECTRIC CO.                 
                                                            E16            -1,044                  08/18/08   11/12/08    RIDLEY ELECTRIC CO., INC.           
                                                            E16             1,044                  11/04/05   11/23/05    RIDLEY ELECTRIC CO.                 
                                                            E18             5,495                  11/04/05     /  /      RIDLEY ELECTRIC CO.                 
                                                            E18             5,495                  11/04/05     /  /      RIDLEY ELECTRIC CO.                 
                                                            E9                  0                  09/02/05   09/08/05    Ridley Electric Co                  
                                                            GC-1           -4,875                  01/07/03   01/16/03    PAC & Assoc.                        
                                                            GC-11         -64,213                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-12               0                  02/24/06   06/06/06    PAC Associates                      
                                                            GC-14         -27,764                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-15          -7,027                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-18         -16,100                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-19          -2,999                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-22         -26,573                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-24          15,805                  05/27/04   06/09/04    PAC & Assoc.                        
                                                            GC-26           8,568                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-27         -12,500                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-29          24,584                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-3                0                  04/04/03   04/21/03    PAC & Assoc.                        
                                                            GC-31           4,104                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-32           4,188                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-34          17,495                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-36          17,173                  06/17/04   06/22/04    PAC & Assoc.                        
                                                            GC-39           9,054                  02/07/05   03/14/05    PAC Associates of OSwego            
                                                            GC-41           5,203                  02/07/05   03/02/05    PAC Associates of OSwego            
                                                            GC-43           8,612                  02/07/05   03/14/05    PAC Associates of Oswego            
                                                            GC-46             556                  02/16/06   06/06/06    PAC Associatres                     
                                                            GC-47          -3,800                  02/24/06   06/06/06    PAC Associates                      
                                                            GC-6           28,136                  05/27/04   06/09/04    PAC & Assoc.                        
                                                            GC-8          -25,077                  05/27/04   06/09/04    PAC & Assoc.                        
                                                            HV-1            2,543                  01/07/03     /  /      HMI Mech.                           
                                                            HV-11               0                  02/24/06   07/24/06    HMI mechanical Systems              
                                                            HV-3           -8,075                  05/27/04   06/09/04    HMI Mech.                           
                                                            HV-4          -17,290                  05/27/04   06/09/04    HMI Mech.                           
                                                            HV-7           -8,677                  05/27/04   06/09/04    HMI Mech.                           
                                                            HV-8          -19,783                  05/27/04   06/09/04    HMI Mech.                           
                                                            HV-9           -4,807                  09/23/04   09/29/04    HMI Mech.                           
                                                            HV1            -2,543                  08/18/08   01/16/09    HMI MECHANCIAL SYSTEMS, INC.        
                                                            M-2             1,550                  05/27/04   06/09/04    Casler Masonry                      
                                                            M11                 0                  02/16/06   06/06/06    Casler masonry                      
                                                            M13            -1,950                  02/16/06   06/06/06    Casler Masonry                      
                                                            M15                 0                  02/16/06   06/06/06    Casler Masonry                      
                                                            M18             5,368                  02/16/06   06/06/06    Casler Masonry                      
                                                            M19            -1,250                  02/16/06   06/06/06    Casler Masonry                      
                                                            M3             -9,000                  02/16/06   06/06/06    Casler Masonry                      
                                                            M6                  0                  02/16/06   06/06/06    Casler Masonry                      
                                                            M7            -13,863                  02/16/06   06/06/06    Casler masonry                      
                                                            M8                  0                  02/16/06   06/06/06    Casler Masonry                      
                                                            P-1            -8,235                  05/27/04   06/09/04    HMI Mech.                           
                                                            P-11             -593                  03/10/06   06/23/06    HMI mechanical Systems              
                                                            P-12             -100                  03/10/06   06/23/06    HMi mechanical Systems              
                                                            P4                  0                  07/11/05   07/22/05    HMI Mechanical Systems              
                                                            P7                  0                  07/11/05   07/22/05    HMI mechanical Systems              
                                                            P9                  0                  07/11/05   07/22/05    HMi Mechanical Systems              
                                                            R-1           -15,713                  11/18/03   12/26/03    Deluxe Roofing                      
                                                            R-10            1,145                  09/23/04   09/29/04    Deluxe Roofing                      
                                                            R-3               606                  11/18/03   12/26/03    Deluxe Roofing                      
                                                            R-5           -20,484                  11/18/03   12/26/03    Deluxe Roofing                      
                                                            R-7             7,420                  06/17/04   06/22/04    Deluxe Roofing                      
                                                            S-10            1,708                  05/03/06   06/14/06    Barber Corp                         
                                                            S-12           10,272                  05/03/06   06/14/06    Barber Corp                         
                                                            S-14           -8,700                  05/03/06   06/14/06    Barber Corp                         
                                                            S-2                 0                  05/03/06   08/09/06    barber Corp                         
                                                            S-7            23,930                  05/03/06   06/14/06    Barber Corp                         
                                                            T-2                 0                  08/01/03   08/15/03    Eugene Sackett                      
                                                            T-6             1,985                  11/18/03   12/26/03    Eugene Sackett                      
                                                            T-7             6,053                  06/07/04   06/22/04    Eugene Sackett                      
                                                            T-9             6,868                  06/07/04   06/22/04    Eugene Sackett                      
                                                            T11             2,845                  02/24/06   06/06/06    Eugen Sackett Co                    
                                                            W-1             1,479                  11/18/03   12/26/03    NEP Glass                           
                                                            W-3             1,189                  11/18/03   12/26/03    NEP Glass                           
                                                            W-4            -9,703                  09/23/04   09/29/04    NEP Glass                           
 
04-1183   Reconstruction               0-003-012  04/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1272   Reconstruction               0-003-013  05/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1             19,408                  08/25/06   10/12/06    Knapp Electric                      
                                                            E2              7,287                  08/25/06   10/12/06    Knapp Electric                      
                                                            GC-3                0                  02/23/06   06/06/06    Bouley Associates                   
                                                            GC-4            4,423                  10/03/06   10/24/06    bouley Associates                   
                                                            GC-5          100,600                  10/03/06   10/24/06    bouley Associates                   
                                                            GC-6           11,969                  01/18/07   01/30/07    Bouley Associates                   
                                                            GC-7           13,600                  01/18/07   01/30/07    Bouley Associates                   
                                                            GC-8           14,916                  01/18/07   01/30/07    Bouley Associates                   
                                                            GC-9           16,850                  01/18/07   01/30/07    Bouley Associates                   
                                                            P1             14,568                  08/25/06   10/30/06    Oswego Mechanical                   
                                                            R-2                 0                  09/26/06   10/24/06    EV Roofing Construction             
                                                            R3                917                  01/18/07   01/30/07    EV Roofing Construction             
 
09-0337   Reconstruction               0-003-014  02/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-003               0                  11/19/12   08/16/13    KNAPP ELECTRIC INC                  
                                                            E-006               0                  11/25/13   02/07/14    KNAPP ELECTRIC,INC.                 
                                                            GC-8                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST)  
                                                            P-3                 0                  11/19/12   07/03/13    Brosh Mechanical Inc.               
                                                            P-4                 0                  11/19/12   08/16/13    Brosh Mechanical Inc.               
                                                            P-9                 0                  12/17/12   08/09/13    Brosh Mechancial, Inc.              
                                                            S-1           251,281                  12/17/10   01/06/11    LAN-CO COMPANIES INC                
                                                            S-4            20,488                  11/19/12   03/08/13    LAN-CO COMPANIES INC                
                                                            S-7                 0                  01/30/12   04/20/12    LAN-CO COMPANIES INC                
                                                            S-7                 0                  11/19/12   03/08/13    LAN-CO COMPANIES INC                
 
11-0748   Reconstruction               0-003-015  07/05/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-003               0                  01/27/14   02/20/14    Weydman Electric, Inc.              
                                                            GC-05               0                  01/09/14     /  /      Bouley Associates, Inc.             
 
18-0049   Reconstruction               0-003-016  01/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  11/22/19   12/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-02               0                  01/15/21   03/30/21    KNAPP ELECTRIC, INC.                
                                                            HC-04               0                  10/30/19   10/31/19    C&S TECHNICAL RESOURCES, INC.       
                                                            HC-07               0                  10/30/19   10/31/19    C&S TECHNICAL RESOURCES, INC.       
                                                            MR-01               0                  12/16/20   03/05/21    LUPINI CONSTRUCTION                 
                                                            PC-01            -725                  11/22/19   12/05/19    SIRACUSE MECHANICAL, INC.           
                                                            PC-04               0                  12/16/20   03/04/21    SIRACUSA MECHANICAL, INC.           
                                                            PC-05               0                  09/03/21   05/24/22    SIRACUSA MECHANICAL INC             
                                                            RC-01          -2,280                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-02            -461                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-04               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-10         -12,170                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-13               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-14               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-15               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
 
19-0491   Reconstruction               0-003-017  01/17/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1866   Reconstruction               0-003-019  07/27/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1499FA Reconstruction               0-003-021  03/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1449   Reconstruction               0-003-022  03/07/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -5,000                  07/10/23     /  /      BACON & SEILER CONSTRUCTION         
 
23-0382   Reconstruction               0-003-023  11/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Kenney Middle School (Cayuga Street):
91-1472   Reconstruction               0-004-003  06/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1143   Reconstruction               0-004-004  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1199   Reconstruction               0-004-005  05/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1114   Reconstruction               0-004-006  03/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1411   Reconstruction               0-004-007  07/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0464   Reconstruction               0-004-008  10/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1770SR Additions and Alterations    0-004-009  06/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0056   Additions and Alterations    0-004-009  01/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1            1,867                  04/01/03   04/21/03    Hazardous Abatement                 
                                                            AA-3           -1,701                  11/14/03   11/17/03    Hazardous Abatement                 
                                                            AA-5            7,925                  11/26/03   12/26/03    Hazardous Abatement                 
                                                            D-3               680                  11/18/03   12/26/03    BR Johnson                          
                                                            D-4                75                  11/18/03   12/26/03    BR Johnson                          
                                                            D-6             3,607                  05/27/04   06/09/04    BR Johnson                          
                                                            E-2           -13,241                  01/07/03   01/16/03    Ridley Elec.                        
                                                            E-7            -1,646                  05/27/04   06/09/04    Ridley Elec.                        
                                                            E-8           -14,269                  05/27/04   06/09/04    Ridley Elec.                        
                                                            E10                 0                  09/02/05   09/07/05    ridley Electric                     
                                                            E11                 0                  09/02/05   09/07/05    Ridley electric Co                  
                                                            E13            31,776                  09/02/05   10/06/05    Ridley Electric Co                  
                                                            E14            14,200                  09/02/05   10/05/05    Ridley Electric Co                  
                                                            E17             2,795                  08/18/08   11/12/08    RIDLEY ELECTRIC CO., INC.           
                                                            E17             2,795                  11/04/05   11/23/05    GRAY MANAGEMENT SYSTEM              
                                                            E19             7,916                  09/18/08     /  /      RIDLEY ELECTRIC CO., INC.           
                                                            E19             7,916                  11/04/05   11/12/08    RIDLEY ELECTRIC CO.                 
                                                            GC-10         -65,302                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-13               0                  02/24/06   06/06/06    PAc Associates                      
                                                            GC-16         -18,684                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-17         -11,437                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-20            -119                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-21         -25,157                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-23           7,609                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-25          21,257                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-28         -12,500                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-30          18,250                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-33           8,205                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-35          20,412                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC-37           3,740                  06/17/04   06/22/04    PAC & Assoc.                        
                                                            GC-38          19,507                  06/17/04   06/22/04    PAC & Assoc.                        
                                                            GC-4                0                  04/04/03   04/21/03    PAC & Assoc.                        
                                                            GC-40         -11,053                  02/07/05   03/14/05    PAC Associates of Oswego            
                                                            GC-42          11,615                  02/07/05   03/02/05    PAC Associates of Oswego            
                                                            GC-44           5,342                  02/07/05   03/14/05    PAC Associates of Oswego            
                                                            GC-5                0                  04/04/03   04/21/03    PAC & Assoc.                        
                                                            GC-7           34,556                  05/27/04   06/09/04    PAC & Assoc.                        
                                                            GC-9          -26,122                  05/19/04   05/27/04    PAC & Assoc.                        
                                                            GC45           13,920                  02/16/06   06/06/06    PAC Associates                      
                                                            HV-10          -5,956                  09/23/04   09/29/04    HMI Mech.                           
                                                            HV-12               0                  02/24/06   07/24/06    HMI Mechanical Systems              
                                                            HV-13          -6,279                  02/24/06   08/08/06    HMi mechanical Systems              
                                                            HV-2            4,976                  01/07/03   01/16/03    HMI Mech.                           
                                                            HV-5          -11,608                  05/27/04   06/09/04    HMI Mech.                           
                                                            HV-6          -11,876                  05/27/04   06/09/04    HMI Mech.                           
                                                            M-1           -50,000                  05/27/04   06/09/04    Casler Masonry                      
                                                            M10                 0                  02/16/06   06/06/06    Casler Masonry                      
                                                            M12                 0                  02/16/06   06/06/06    casler Masonry                      
                                                            M14                 0                  02/16/06   06/06/06    CASLER MASONRY, INC.                
                                                            M16                 0                  02/16/06   06/06/06    Casler Masonry                      
                                                            M17                 0                  02/16/06   06/06/06    Casler Masonry                      
                                                            M20             1,250                  02/16/06   06/06/06    Casler masonry                      
                                                            M4             -9,000                  02/16/06   06/06/06    Casler Masonry                      
                                                            M5                  0                  02/16/06   06/06/06    Casler masonry                      
                                                            M9               -638                  02/16/06   06/06/06    Casler Masonry                      
                                                            P-10                0                  03/10/06   06/23/06    HMI Mechanical systems              
                                                            P-13           -3,111                  03/10/06   06/23/06    HMI Mechanical Systems              
                                                            P-2           -12,267                  05/27/04   06/09/04    HMI Mech.                           
                                                            P-3            -2,186                  05/27/04   06/09/04    HMI Mech.                           
                                                            P5                  0                  07/11/05   07/22/05    HMI mechanical Systems              
                                                            P6                  0                  07/11/05   07/22/05    HMI Mechanical Systems              
                                                            P8                  0                  07/11/05   07/22/05    HMI Mechanical Systems              
                                                            R-11            1,715                  02/07/05   03/14/05    Deluxe Roofing and Sheet metal      
                                                            R-2           -15,719                  11/18/03   12/26/03    Deluxe Roofing                      
                                                            R-4              -461                  11/18/03   12/26/03    Deluxe Roofing                      
                                                            R-6           -26,834                  11/18/03   12/26/03    Deluxe Roofing                      
                                                            R-8             3,246                  06/17/04   06/22/04    Deluxe Roofing                      
                                                            R-9             4,700                  09/23/04   09/29/04    Deluxe Roofing                      
                                                            R12             8,426                  09/02/05     /  /      Deluxe Roofing Sheet metal          
                                                            S-1                 0                  12/10/01   05/28/02    Barber Corp.                        
                                                            S-13           18,099                  05/03/06   06/14/06    barber Corp                         
                                                            S-8             1,734                  05/03/06   06/14/06    Barber Corp                         
                                                            S-9            17,285                  05/03/06   06/14/06    Barber Corp                         
                                                            S11            18,400                  05/04/06   06/14/06    Barber Corp                         
                                                            T-1               325                  04/01/03   04/21/03    Eugene Sackett                      
                                                            T-10            7,519                  06/07/04   06/22/04    Eugene Sackett                      
                                                            T-3                 0                  08/01/03   08/15/03    Eugene Sackett                      
                                                            T-4                 0                  08/01/03   08/15/03    Eugene Sackett                      
                                                            T-5            12,165                  11/18/03   12/26/03    Eugene Sackett                      
                                                            T-8            -2,509                  06/07/04   06/22/04    Eugene Sackett                      
                                                            T10             7,519                  08/18/08   11/18/08    EUGUNE G. SACKETT CO., INC.         
                                                            W-2                24                  11/17/03   12/26/03    NEP Glass                           
                                                            W-5            -6,245                  09/23/04   09/29/04    NEP Glass                           
                                                            W6             -6,217                  02/24/06   06/06/06    Nep Glass Co                        
 
08-1630   Reconstruction               0-004-011  06/05/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-1             2,499                  09/24/09   10/09/09    A.M. STERN INC                      
                                                            R-2             1,795                  09/24/09   10/09/09    A.M. STERN INC                      
                                                            R-3             9,744                  09/24/09   10/09/09    A.M. STERN INC                      
                                                            R-4              -556                  09/24/09   10/09/09    A.M. STERN INC                      
 
09-0338   Reconstruction               0-004-012  02/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-007               0                  11/25/13   02/07/14    KNAPP ELECTRIC,INC.                 
                                                            FS-001        -10,228                  01/30/12   04/20/12    MAIN-FORD GENERAL SUPPLY CO INC     
                                                            GC-11               0                  11/19/12   03/08/13    E.L. AMES INC (R.J. ORTLIEB INC)    
                                                            GC-6                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST)  
                                                            GC-7                0                  01/30/12   04/20/12    E.L. AMES INC (R.J. ORTLIEB CONST)  
                                                            GC-8                0                  11/19/12   03/08/13    E.L. AMES INC (R.J. ORTLIEB CONST)  
                                                            H-2                 0                  11/19/12   07/16/13    HMI Mechanical Systems, Inc.        
                                                            H-3                 0                  11/19/12   08/16/13    HMI Mechanical Systems, Inc.        
                                                            P-11                0                  12/17/12   08/09/13    Brosh Mechanical, Inc.              
                                                            P-2                 0                  11/19/12   08/16/13    Brosh Mechancial Inc.               
                                                            P-3                 0                  11/19/12     /  /      Brosh Mechancial Inc.               
                                                            P-5                 0                  11/19/12   08/16/13    Brosh Mechanical Inc.               
                                                            P-8                 0                  12/17/12   08/09/13    Brosh Mechancial, Inc.              
                                                            S-10                0                  11/19/12   03/08/13    LAN-CO COMPANIES INC                
                                                            S-11           -4,017                  11/19/12   03/12/13    LAN-CO COMPANIES INC                
                                                            S-2           492,261                  12/17/10   01/06/11    LAN-CO COMPANIES INC                
                                                            S-5                 0                  01/30/12   04/20/12    LAN-CO COMPANIES INC                
 
11-0749   Reconstruction               0-004-013  07/05/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002               0                  01/27/14   02/20/14    Weydman Electric, Inc.              
                                                            E-004               0                  05/05/14   05/22/14    Weydman Electric, Inc.              
                                                            GC-03               0                  01/09/14   02/06/14    Bouley Associates, Inc.             
                                                            H-002          41,354                  01/09/14   02/06/14    HMI Mechanical Systems, Inc.        
                                                            P-002            -102                  01/09/14   02/06/14    HMI Mechanical Systems, Inc.        
 
18-0050   Reconstruction               0-004-014  01/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-01               0                  10/24/19   10/25/19    C&S TECHNICAL RESOURCES INC.        
                                                            HC-03               0                  10/24/19   10/25/19    C&S TECHNICAL RESOURCES INC.        
                                                            MR-02               0                  12/16/20   03/03/21    LUPINI CONSTRUCTION                 
                                                            PC-01            -725                  11/22/19   12/05/19    SIRACUSE MECHANICAL, INC.           
                                                            PC-03               0                  12/16/20   03/04/21    SIRACUSA MECHANICAL, INC.           
                                                            PC-1                0                  09/03/21   06/07/22    SIRACUSA MECHANICAL INC.            
                                                            RC-03               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-05               0                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-06          -4,000                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            RC-11         -10,279                  12/16/20   03/03/21    TITAN ROOFING, INC.                 
                                                            SC-05          -1,429                  11/22/19   12/04/19    R.H. LAW, INC.                      
                                                            SC-06               0                  11/22/19   12/04/19    R.H. LAW, INC.                      
                                                            SC-08               0                  11/22/19   12/04/19    R.H. LAW, INC.                      
 
19-0492   Reconstruction               0-004-015  01/17/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1867FC Reconstruction               0-004-017  07/27/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0038FA Reconstruction               0-004-019  09/19/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2304FP Reconstruction               0-004-FP1  08/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Pole Barn:
99-0085   New Construction             2-012-001  11/08/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          xxxBus Garagexxx DEMOLISHED:
91-1473   Reconstruction               5-006-004  06/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1200   Reconstruction               5-006-005  05/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0029   Additions and Alterations    5-006-006  08/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0383   Additions and Alterations    5-006-007  05/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0493   Reconstruction               5-006-009  01/17/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Maintenance Building:
18-0268   New Construction             5-015-001  12/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03               0                  01/15/21   03/30/21    KNAPP ELECTRIC, INC.                
                                                            EC-04               0                  01/15/21   03/30/21    KNAPP ELECTRIC, INC.                
                                                            EC-05               0                  01/15/21   03/30/21    KNAPP ELECTRIC, INC.                
                                                            EC-06          15,235                  01/15/21   03/30/21    KNAPP ELECTRIC, INC.                
                                                            EC-07          28,690                  01/15/21   03/30/21    KNAPP ELECTRIC, INC.                
                                                            PC-07               0                  09/03/21   05/24/22    SIRACUSA MECHANICAL INC.            
                                                            PC-08               0                  09/03/21   05/24/22    SIRACUSA MECHANICAL INC             
                                                            PC-10          -1,035                  11/05/21   12/12/22    Siracusa Mech Inc                   
                                                            PC-11               0                  11/05/21   12/12/22    Siracursa Mech Inc                  
                                                            PC-12         -21,991                  09/03/21   05/24/22    SIRACUSA MECHANICAL INC             
                                                            RC-09               0                  12/16/20   04/06/21    TITAN ROOFING, INC.                 
                                                            SC-09               0                  12/16/20   04/06/21    R.H. LAW, INC.                      
                                                            SC-10               0                  12/16/20   04/06/21    R.H. LAW, INC.                      
                                                            SC-11         -33,915                  12/16/20   04/06/21    R.H. LAW, INC.                      
                                                            SC-13         -51,404                  12/16/20   04/06/21    R.H. LAW, INC.                      
 

          Toilet/Storage Building:
03-0384   New Construction             7-013-001  05/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
09-1076   New Construction             7-014-001  05/19/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
00-0546   Reconstruction               7-999-001  01/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1215   Reconstruction               7-999-002  04/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1454EP Energy Project               7-999-E01  05/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE

CENTRAL SQUARE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-08-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Brewerton Elementary:
90-0643   Reconstruction               0-001-002  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0616   Reconstruction               0-001-005  03/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1664   Reconstruction               0-001-006  07/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1546   Reconstruction               0-001-008  12/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-02         -46,335                  02/29/08   04/11/08    CFI CONSTRUCTION, INC.              
 
01-0223   Reconstruction               0-001-009  10/10/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1677   Reconstruction               0-001-011  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0398   Reconstruction               0-001-012  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002               856                  11/03/08   04/07/09    MYRIAD CONSTRUCTION, INC.           
                                                            003                97                  11/03/09     /  /      MYRIAD CONSTRUCTION, INC.           
                                                            004             1,096                  11/03/08   04/07/09    MYRIAD CONSTRUCTION                 
                                                            009             2,125                  10/13/09   11/18/09    M & N PLUMBING & HEATING INC        
                                                            011               490                  06/23/10   12/17/10    MYRIAD CONSTRUCTION INC             
                                                            014             4,406                  08/13/09   09/18/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            021             6,431                  09/18/09   11/10/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            022             1,275                  10/13/09   11/18/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            036            10,308                  11/23/09   01/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            037            18,877                  01/27/10   05/10/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            039             7,796                  01/27/10   05/10/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            043             5,998                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
 
17-1948   Reconstruction               0-001-013  01/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-13          2,413                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            GC2-15         12,992                  10/15/21   12/06/22    PAC& Associates of Oswego           
                                                            GC2-17         13,742                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-24         17,988                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-27          1,083                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            GC2-33          4,199                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            MC2-17              0                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-18              0                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            PC2-08              0                  07/01/21   03/15/22    Lawman Heating and Cooling          
 
17-0821   Reconstruction               0-001-014  01/12/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-001             0                  12/14/18   01/24/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-01          2,669                  02/28/19   03/15/19    WEYDMAN ELECTRIC, INC.              
                                                            MC1-002             0                  12/14/18   01/24/19    DW & CREW MECHANICALS, INC.         
                                                            RC-001          1,808                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            RC-006          7,358                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            RC-008         -7,826                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            RC1-01              0                  12/14/18   01/24/19    PULVER ROOFING COMPANY INC.         
                                                            SC1-003             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVATION, INC.         
                                                            SC1-004             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVATION, INC.         
 
18-0740   Reconstruction               0-001-015  12/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1315   Reconstruction               0-001-016  05/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04           6,592                  02/17/22   02/14/23    Weydman Elec Inc                    
                                                            GC-03           4,046                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-04           1,799                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-05           2,089                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-06            -655                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-08             892                  02/17/22   02/16/23    PAC Assoc of Oswego Inc             
                                                            GC-17           4,104                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            GC-20           1,277                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-22          21,853                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-23          10,502                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-30           1,517                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-32           2,026                  03/03/22   03/06/23    PAC Assoc of Oswego Inc             
                                                            GC-36           3,986                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-36           7,008                  03/03/22   03/06/23    PAC Assocs of Oswego Inc            
                                                            GC-41            -324                  03/03/22   03/06/23    PAC Assoc of Oswego Inc             
                                                            GC-42          23,712                  03/03/22   03/06/23    PAC Assoc of Oswego Inc             
                                                            GC-48           6,868                  06/10/22   03/28/23    PAC Assocs of Oswego Inc            
                                                            PC-02           1,065                  02/17/22     /  /      HMI Mech Systems Inc                
                                                            PC-03           1,416                  02/17/22   03/28/23    HMI Mech Systems Inc                
 
02-2031FP Reconstruction               0-001-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cole Elementary at Constantia:
90-0644   Alterations                  0-002-003  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0617   Reconstruction               0-002-005  03/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1492   Reconstruction               0-002-007  06/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1665   Reconstruction               0-002-008  07/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1547   Reconstruction               0-002-009  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1678   Reconstruction               0-002-010  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0399   Reconstruction               0-002-011  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002           928,712                  01/21/09   02/27/09    M&N PLUMBING & HEATING INC.         
                                                            004            10,130                  11/03/08   12/03/08    PAC & ASSOCIATES OF OSWEGO INC      
                                                            004               888                  02/27/09   04/07/09    J&A MECHANICAL CONTRACTORS INC.     
                                                            004             3,225                  04/20/09   08/04/09    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            005            17,135                  11/03/08   12/03/08    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            005              -320                  05/18/11   07/21/11    J&A MECHANICAL CONTRACTORS INC      
                                                            008             2,774                  12/05/08   01/22/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            008            -2,400                  05/18/11   07/21/11    J&A MECHANICAL CONTRACTORS INC      
                                                            009               158                  06/02/09   08/19/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            011             1,766                  10/13/09   11/18/09    M & N PLUMBING & HEATING INC        
                                                            013             2,471                  08/13/09   09/18/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            020             2,509                  09/18/09   11/10/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            024            -1,053                  10/13/09   11/18/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            030             3,180                  10/13/09   11/18/09    PAC & ASSOCATES OF OSWEGO, INC.     
                                                            033             3,465                  11/23/09   01/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            051              -780                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            052            -2,011                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
 
14-1036   Reconstruction               0-002-012  05/27/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1306   Reconstruction               0-002-013  05/27/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1495   Reconstruction               0-002-014  09/08/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1949   Reconstruction               0-002-015  01/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-02              0                  06/18/21   02/01/22    Weydman Electric Inc                
                                                            EC2-02          1,826                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-11              0                  07/01/21   03/16/22    Weydman Electric Inc                
                                                            EC2-12          2,586                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-18          3,730                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            GC2-28          8,931                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            GC2-31          3,278                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            GC2-35AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            MC2-14          8,234                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            PC2-04              0                  06/18/21   03/22/22    Lawman Heating and Cooling          
                                                            PC2-07              0                  07/01/21   03/15/22    Lawman Heating and Cooling          
 
17-0822   Reconstruction               0-002-016  01/12/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-002             0                  12/14/18   01/24/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-04         14,619                  02/28/19   03/15/19    WEYDMAN ELECTRIC, INC.              
                                                            MC1-001             0                  12/14/18   01/24/19    DW & CREW MECHANICALS, INC.         
                                                            RC-002         20,251                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            RC-007          4,488                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            SC1-005             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVATION, INC.         
                                                            SC1-008             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVATION, INC.         
 
19-1316   Reconstruction               0-002-017  05/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAGC-18             0                  02/17/22     /  /      PAC Assocs of Oswego Inc            
                                                            AAGC-21         3,662                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            AAMC-02             0                  02/17/22   03/06/23    Erie Mech Contrs Inc                
                                                            AAPC-04             0                  02/17/22   03/28/23    HMI Mech Systems Inc                
                                                            EC-05          16,182                  02/17/22   02/14/23    Weydman Elec Inc                    
                                                            EC-06           2,758                  02/17/22     /  /      Weydman Elec Inc                    
                                                            GC-04          -3,930                  02/17/22     /  /      PAC Assocs of Oswego Inc            
                                                            GC-06           2,851                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-07           2,352                  02/17/22   02/16/23    PAC Assocs Oswego Inc               
                                                            GC-11          10,151                  03/03/22   02/22/23    PAC Assocs of Oswego Inc            
                                                            GC-12           4,784                  03/03/22   02/22/23    PAC Assocs of Oswego Inc            
                                                            GC-18           8,863                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-24           3,509                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-28           2,214                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-29           3,068                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-29             167                  03/03/22     /  /      PAC Assocs of Oswego Inc            
                                                            GC-31           5,164                  03/03/22   03/06/23    PAC Assocs of Oswego Inc            
                                                            GC-35           2,805                  03/03/22   03/06/23    PAC Assoc of Oswego Inc             
                                                            GC-38          20,135                  03/03/22     /  /      PAC Assocs of oswego Inc            
                                                            GC-47           6,545                  06/10/22   03/28/23    PAC Assocs of Oswego                
                                                            GC-51          13,559                  06/10/22   03/30/23    PAC Assocs of Oswego Inc            
                                                            GC-54           1,914                  06/22/22   05/16/23    PAC Assocs of Oswego Inc            
                                                            MC-03          22,464                  06/22/22   04/27/23    Erie Mech Contrs Inc                
                                                            MC-04          25,107                  03/03/22   12/06/22    Erie Mech Contrs Inc                
                                                            MC-2           34,722                  03/03/22   12/06/22    Erie Mech Contrs Inc                
                                                            SC-01         -11,115                  03/03/22   02/22/23    Smith Site Dev LLC                  
                                                            SC-01           6,884                  03/03/22   12/06/22    Smith Site Dev LLC                  
 
02-2036FP Reconstruction               0-002-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXCleveland Elementary(sold 08/2019):
90-0890   Additions and Alterations    0-003-002  01/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0754   Reconstruction               0-003-003  01/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0891   Reconstruction               0-003-005  01/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0618   Reconstruction               0-003-006  03/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1067   Reconstruction               0-003-007  03/07/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1548   Reconstruction               0-003-008  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1679   Reconstruction               0-003-009  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0400   Reconstruction               0-003-010  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            007            19,921                  10/13/09   11/18/09    M & N PLUMBING & HEATING INC        
                                                            008            16,631                  10/13/09   11/18/09    M & N PLUMBING & HEATING INC        
                                                            045            19,062                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            053             3,570                  07/16/10   11/17/10    PAC & ASSOCIATES OF OSWEGO INC      
 
02-2029FP Reconstruction               0-003-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Paul V Moore High School:
96-0745   Additions and Alterations    0-005-005  03/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0424   Reconstruction               0-005-006  11/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0036   Reconstruction               0-005-007  08/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1549   Reconstruction               0-005-008  12/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-1            20,340                  02/29/08   04/15/08    AIRTECH HEATING & AIR CONDIT SYSTEMS
                                                            SC-01          59,927                  07/21/03   07/23/03    CFI Const.                          
                                                            SC-01          59,927                  02/28/08   03/19/08    CFI CONSTRUCTION, INC.              
 
02-1680   Reconstruction               0-005-009  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0401   Reconstruction               0-005-010  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,320                  11/03/08   04/07/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            002             1,287                  11/03/08   12/03/08    PAC & ASSOCIATES                    
                                                            003           929,187                  01/21/09   02/27/09    M&N PLUMBING & HEATING INC.         
                                                            005             7,474                  04/20/09   08/04/09    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            012             3,088                  12/24/09   02/17/10    M&N PLUMBING & HEATING INC          
                                                            012             2,644                  06/23/10   12/17/10    MYRIAD CONSTRUCTION INC             
                                                            031             3,179                  11/23/09   01/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            046             7,883                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
 
12-0143   Reconstruction               0-005-011  01/28/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0823   Reconstruction               0-005-012  01/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-003             0                  12/14/18   01/24/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-03         12,791                  02/28/19   03/15/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-06         16,622                  02/28/19   03/15/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-08          9,700                  02/08/19   03/15/19    WEYDMAN ELECTRIC INC                
                                                            EC1-10          5,688                  06/05/19   07/02/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-14          5,872                  06/12/20   08/06/20    WEYDMAN ELECTRIC, INC.              
                                                            EC1-15           -935                  04/30/21   08/03/21    WEYDMAN ELECTRIC, INC.              
                                                            MC1-004             0                  12/14/18   01/24/19    DW & CREW MECHANICALS, INC.         
                                                            MC1-06         18,829                  05/28/21   08/12/21    DW & CREW MECH                      
                                                            MC1-07         17,833                  05/28/21   08/12/21    DW & CREW MECH                      
                                                            MC1-08         19,827                  05/28/21   08/12/21    DW & CREW MECH                      
                                                            MC1-09         34,998                  05/28/21   08/12/21    DW & CREW MECH                      
                                                            MC1-10          6,972                  05/28/21   08/12/21    DW & CREW MECH                      
                                                            RC-003        -30,000                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            RC-010        155,000                  02/08/19   03/15/19    PULVER ROOFING CO INC               
                                                            RC-011          2,187                  04/30/21   08/05/21    PULVER ROOFING CO., INC.            
                                                            RC-012         11,386                  04/30/21   08/05/21    PULVER ROOFING CO., INC.            
                                                            RC-013         18,738                  04/30/21   08/05/21    PULVER ROOFING CO., INC.            
                                                            RC1-02              0                  04/30/21   08/05/21    PULVER ROOFING CO., INC.            
                                                            SC-01         -52,215                  04/30/21     /  /      CUNNINGHAM EXCAVATION, INC.         
                                                            SC-011              0                  04/30/21   08/05/21    CUNNINGHAM EXCAVATION, INC.         
                                                            SC1-001             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVATION, INC.         
                                                            SC1-002             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVTION, INC.          
                                                            SC1-009             0                  04/30/21   08/05/21    CUNNINGHAM EXCAVATION, INC.         
                                                            SC1-010             0                  04/30/21     /  /      CUNNINGHAM EXCAVATION, INC.         
 
17-1950   Reconstruction               0-005-013  01/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-01          1,663                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-03              0                  06/18/21   02/01/22    Weydman Electric Inc                
                                                            EC2-04              0                  06/18/21   02/01/22    Weydman Electric Inc                
                                                            EC2-04         15,680                  12/07/21   12/20/22    Weydman Const Co                    
                                                            EC2-04         15,680                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-05              0                  06/18/21   02/01/22    Weydman Electric Inc                
                                                            EC2-06              0                  06/18/21   02/01/22    Weydman Electric Inc                
                                                            EC2-06          2,116                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-09         13,865                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-13              0                  07/01/21   03/16/22    Weydman Electric Inc                
                                                            EC2-14              0                  07/01/21   03/16/22    Weydman Electric Inc                
                                                            EC2-15         14,022                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-17         28,290                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-19         12,709                  10/15/21   12/05/22    Weydman Electric                    
                                                            EC2-21         32,288                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-22         11,542                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-23          5,028                  12/07/21   12/16/22    Weydman Elec Co                     
                                                            EC2-23          5,028                  12/08/21   12/20/22    Weydman Elec Inc                    
                                                            GC2-03        276,000                  10/15/21   12/06/22    PAC&Assoc of Oswego Inc             
                                                            GC2-04              0                  06/18/21   04/07/22    PAC Associates of Oswego            
                                                            GC2-05              0                  06/18/21   04/07/22    PAC Associates of Oswego            
                                                            GC2-06         -4,547                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-07         15,547                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-08          8,421                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-10         11,345                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-11              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-14         19,822                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-18          1,632                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-19              0                  07/01/21   12/21/21    PAC Associates of OSwego Inc        
                                                            GC2-19         17,456                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-20              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-20          5,967                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-21              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-22              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-22          6,442                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-23AA            0                  10/15/21   07/28/22    PAc Associates of Oswego Inc        
                                                            GC2-24AA            0                  10/15/21   07/28/22    PAC&Assoc of Oswego                 
                                                            GC2-25         24,359                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-25AA            0                  10/15/21   07/28/22    PAC & Assoc of Oswego               
                                                            GC2-29         10,121                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-30AA            0                  10/15/21   07/28/22    PAC&Assoc of Oswego                 
                                                            GC2-31AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego                 
                                                            GC2-34          2,518                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-35          2,524                  10/18/21   12/06/22    PAC Asssoc of Oswego                
                                                            GC2-39AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-41         35,000                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-42         13,187                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-42AA            0                  10/15/21   07/28/22    PAC&Assoc of Oswego Inc             
                                                            GC2-43          7,723                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-44         31,500                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-45         19,342                  10/18/21   12/06/22    PAC Assoc of of Oswego              
                                                            GC2-46         10,945                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-48         14,678                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-49         -6,000                  10/18/21   12/06/22    PAC Assoc of Oswego                 
                                                            GC2-50         -4,994                  12/07/21   09/22/22    PAC Assoc of Oswego Inc             
                                                            MC2-01              0                  06/18/21   02/01/22    Erie Mechanical Contractors         
                                                            MC2-01        121,661                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-02         28,225                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-05              0                  06/18/21   02/01/22    Erie Mechanical Contractors         
                                                            MC2-09          7,195                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-10         32,728                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-10          1,837                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-11          4,874                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-12         29,266                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-15         16,168                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-16         10,821                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-19AA        6,735                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            PC2-01            888                  07/01/21   03/16/22    Lawman Heating and Cooling          
                                                            PC2-02          2,002                  07/01/21   03/16/22    Lawman Heating and Cooling          
                                                            PC2-03              0                  06/18/21   03/22/22    Lawman Heating and Cooling          
                                                            PC2-06              0                  06/18/21   03/22/22    Lawman Heating and Cooling, Inc.    
                                                            PC2-11          1,703                  07/01/21   03/15/22    Lawman Heating and Cooling          
                                                            TC2-01              0                  06/18/21   02/01/22    Syracuse Scenery & Stage Lighting   
                                                            TC2-01        -33,476                  12/07/21   09/22/22    Syracuse Scen&Stage Light Co Inc    
 
19-1317   Reconstruction               0-005-014  05/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           8,038                  02/17/22   02/14/23    Weydman Elec Inc                    
                                                            GC-01           5,336                  02/17/22   02/16/23    PAC Assocs of oswego Inc            
                                                            GC-05          -7,860                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-09          13,317                  03/03/22   02/22/23    PAC Assocs of Oswego Inc            
                                                            GC-10          23,601                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-10           7,487                  03/03/22     /  /      PAC Assocs of Oswego Inc            
                                                            GC-11          10,543                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-15           1,286                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            GC-17           3,879                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-25           4,041                  03/03/22   02/22/23    PAC ASSOCIATES OF OSWEGO            
                                                            GC-32           2,968                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-37           5,687                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-44          12,151                  03/03/22   03/06/23    PAC Assocs of Oswego Inc            
                                                            GC-49            -190                  06/10/22   03/28/23    PAC Assocs of Oswego Inc            
                                                            GC-53          21,321                  06/22/22     /  /      PAC Assocs of Oswego Inc            
                                                            GC-55           6,156                  06/22/22     /  /      PAC Assocs of Oswego Inc            
                                                            PC-03             803                  02/17/22   03/28/23    HMI Mech Systems Inc                
                                                            PC-04           2,947                  02/17/22   03/28/23    HMI Mech Systems Inc                
                                                            PC-05             507                  02/17/22   03/28/23    HMI Mech Sys Inc                    
 
20-0016   Reconstruction               0-005-015  07/27/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1672   Reconstruction               0-005-016  06/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0783   Reconstruction               0-005-017  03/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2078   Reconstruction               0-005-018  06/29/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2033FP Reconstruction               0-005-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hawk Primary School:
90-0646   Reconstruction               0-006-004  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1550   Reconstruction               0-006-006  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1681   Reconstruction               0-006-007  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0402   Reconstruction               0-006-008  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           320,636                  10/28/08   04/13/09    J & A MECHANCIAL CONTRACTORS INC.   
                                                            001           927,988                  01/21/09   02/27/09    M & N PLUMBING & HEATING INC.       
                                                            002            10,019                  11/03/08   12/03/08    PAC & ASSOCIATES OF OSWEGO INC      
                                                            002             3,400                  11/04/08   12/03/08    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            002             4,584                  02/27/09   04/03/09    J&A MECHANICAL CONTRACTORS INC.     
                                                            003            16,625                  11/05/08   11/12/08    CENTRAL NEW YORK CONSTRUCTION,INC.  
                                                            005             5,456                  11/03/08   04/07/09    MYRIAD CONSTRUCTION, INC.           
                                                            005             6,761                  10/13/09   11/18/09    M & N PLUMBING & HEATING INC.       
                                                            007               670                  04/20/09   08/04/09    MYRIAD CONSTRUCTION                 
                                                            007            11,268                  04/20/09   08/04/09    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            010          -134,536                  06/02/09   08/19/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            011            -6,056                  06/02/09   08/19/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            014            15,948                  01/27/10   05/10/10    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            015             1,446                  08/13/09   09/18/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            015              -300                  06/23/10   08/17/10    M&N PLUMBING & HEATING INC          
                                                            019           -10,607                  09/18/09   11/10/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            026               612                  10/13/09   11/18/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            028             7,160                  10/13/09   11/18/09    PAC & ASSOCATES OF OSWEGO, INC.     
                                                            034               420                  11/23/09   01/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            040               184                  01/27/10   05/10/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            047              -851                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
 
17-1951   Reconstruction               0-006-009  01/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-01              0                  06/18/21   02/01/22    Weydman Electric Inc                
                                                            EC2-03          6,049                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-05         31,060                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-07              0                  06/18/21   02/01/22    Weydman Electric                    
                                                            EC2-07          8,646                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-08              0                  07/01/21   03/16/22    Weydman Electric Inc                
                                                            EC2-10          4,210                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-11         10,586                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-12              0                  07/01/21   03/16/22    Weydman Electric Inc                
                                                            EC2-16          3,595                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            EC2-20          1,856                  10/15/21   12/06/22    Weydman Electric Inc                
                                                            GC2-01              0                  06/18/21   04/07/22    PAC Associates of Oswego            
                                                            GC2-02           -776                  10/15/21   12/06/22    PAC& Assoc of Oswego                
                                                            GC2-03              0                  06/18/21   04/07/22    PAC Associates of Oswego, Inc.      
                                                            GC2-04        306,000                  10/15/21   12/06/22    PAC & Assoc of Oswego Inc           
                                                            GC2-05         22,589                  10/15/21   12/06/22    PAC Assoc of Oswego Inc             
                                                            GC2-06              0                  06/18/21   04/07/22    PAC Associates of Oswego            
                                                            GC2-07              0                  06/18/21   04/07/22    PAC Associates of Oswego Inc        
                                                            GC2-08              0                  06/18/21   04/07/22    PAC Associates of Oswego            
                                                            GC2-09              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-09         21,804                  10/15/21   12/06/22    PAC& Associates of Oswego           
                                                            GC2-10              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-11         27,811                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-12              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-12         10,260                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-13              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-13         27,546                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-15              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-16              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-16         13,342                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-17              0                  07/01/21   12/21/21    PAC Associates of Oswego            
                                                            GC2-18              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-21          6,502                  10/15/21   12/06/22    PAc & Associates of Oswego          
                                                            GC2-26         26,170                  10/18/21   12/06/22    PAC&Assoc of Oswego                 
                                                            GC2-27AA            0                  10/15/21   07/28/22    PAC&Assoc of Oswego                 
                                                            GC2-28AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-29AA        3,177                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-30         23,573                  10/18/21   12/06/22    PAC &Assoc of Oswego                
                                                            GC2-32         17,954                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            GC2-32AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-33AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-34AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-36         10,956                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            GC2-36AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-37         11,903                  10/18/21   12/06/22    PAC &Assoc of Oswego                
                                                            GC2-37AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-38          3,362                  10/18/21   07/28/22    PAC & Assoc of Oswego               
                                                            GC2-38AA            0                  10/15/21     /  /      PAC Assoc of Oswego Inc             
                                                            GC2-39          3,953                  10/18/21     /  /      PAC & Assoc of Oswego               
                                                            GC2-40AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            MC2-02              0                  06/18/21   02/01/22    Erie Mechanical Contractors INC     
                                                            MC2-03              0                  06/18/21   02/01/22    Erie Mechanical Contractors Inc     
                                                            MC2-08          4,701                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-20AA            0                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-21AA            0                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            PC2-01              0                  06/18/21   03/22/22    Lawman Heating and Cooling          
                                                            PC2-05              0                  06/18/21   03/22/22    Lawman Heating and Cooling Inc      
                                                            PC2-10            566                  07/01/21   03/15/22    Lawman Heating and Cooling          
 
17-0824   Reconstruction               0-006-010  01/12/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-07         37,100                  02/08/19   03/15/19    WEYDMAN ELECTRIC INC                
                                                            EC1-09         28,265                  06/05/19   07/02/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-11         34,271                  06/05/19   07/02/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-12         28,630                  12/10/19   01/09/20    WEYDMAN ELECTRIC, INC.              
                                                            MC1-01        203,000                  02/08/19   03/15/19    DW & CREW MECHANICALS INC           
                                                            RC-004        -17,000                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            RC-009        732,000                  02/08/19   03/15/19    PULVER ROOFING CO IN                
 
19-1318   Reconstruction               0-006-011  05/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAGC-19             0                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            AAMC-01             0                  02/17/22   03/28/23    Erie Mech Contrs Inc                
                                                            EC-03           1,378                  02/17/22   02/14/23    Weydman Elec Inc                    
                                                            GC-02          -1,965                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-12           2,868                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            GC-13           7,143                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            GC-14             973                  03/03/22   02/22/23    PAC Assocs of Oswego Inc            
                                                            GC-19           3,697                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-22           2,854                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-23           3,528                  03/03/22   02/22/23    PAC Assocs of Oswego Inc            
                                                            GC-30           5,591                  03/03/22   03/06/23    PAC Assoc of Oswego Inc             
                                                            GC-31           3,716                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-34             519                  03/03/22   03/06/23    PAC Assocs of Oswego Inc            
                                                            GC-38           1,304                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-39          -2,106                  03/03/22     /  /      PAC Assoc of Oswego Inc             
                                                            GC-46           6,484                  06/10/22   03/28/23    PAC Assocs of Oswego                
                                                            GC-50             591                  06/10/22   03/28/23    PAC Assocs of Oswego                
                                                            MC-01          21,036                  03/03/22   12/06/22    Erie Mech Contrs Inc                
                                                            MC-04          17,641                  06/22/22   04/27/23    Erie Mech Contrs Inc                
                                                            MC-05           7,291                  03/03/22   12/06/22    Erie Mech Contrs Inc                
                                                            MC-05           7,291                  03/03/22   12/06/22    Erie Mech Contrs Inc                
                                                            MC-07          11,414                  03/03/22   12/06/22    Erie Mech Contrs Inc                
                                                            PC-02           1,332                  02/17/22   03/28/23    HMI Mech Sys Inc                    
 
02-2032FP Reconstruction               0-006-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central Square Intermediate:
90-0645   Additions and Alterations    0-007-002  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0493   Reconstruction               0-007-004  02/27/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1213   Reconstruction               0-007-005  05/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1666   Reconstruction               0-007-006  07/06/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1551   Reconstruction               0-007-007  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1682   Reconstruction               0-007-008  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0403   Reconstruction               0-007-009  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             1,374                  11/03/08   12/03/08    PAC & ASSOCIATES                    
                                                            003           -12,370                  11/03/08   12/03/08    PAC & ASSOCIATES OF OSWEGO INC      
                                                            003                65                  02/27/09   04/03/09    J&A MECHANICAL CONTRACTORS INC.     
                                                            004             1,957                  01/21/09   06/25/09    M&N PLUMBING & HEATING INC.         
                                                            009               490                  10/13/09   11/18/09    MYRAID CONSTRUCTION, INC.           
                                                            010            15,356                  01/27/10   05/10/10    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            010             1,769                  06/23/10   12/17/10    MYRIAD CONSTRUCTION INC             
                                                            011            17,770                  01/27/10   05/10/10    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            012             3,542                  06/02/09   08/19/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            014               596                  06/23/10   08/17/10    M&N PLUMBING & HEATING INC          
                                                            016            -1,103                  08/13/09   09/18/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            018             6,566                  09/18/09   11/10/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            025               896                  10/13/09   11/18/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            029             4,660                  10/13/09   11/18/09    PAC & ASSOCATES OF OSWEGO, INC.     
                                                            032            12,079                  11/23/09   01/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            042            35,984                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            049              -802                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            EC-008          4,328                  07/27/09   08/13/09    MYRIAD CONSTRUCTION, INC            
 
17-1952   Reconstruction               0-007-011  01/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-10              0                  07/01/21   03/16/22    Weydman Electric Inc                
                                                            EC2-14          3,129                  10/15/21   12/05/22    Weydman Electric Inc                
                                                            GC2-02              0                  06/18/21   04/07/22    PAC Associates of Oswego            
                                                            GC2-14              0                  07/01/21   12/21/21    PAC Associates of Oswego Inc        
                                                            GC2-51           -682                  12/07/21   09/22/22    PAC Assoc of Oswego Inc             
                                                            MC2-04              0                  06/18/21   02/01/22    Erie Mechanical Contractors         
 
19-1319   Reconstruction               0-007-012  05/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-09           6,476                  02/17/22   02/16/23    PAC Assoc Of Oswego Inc             
                                                            GC-15             374                  03/03/22   02/22/23    PAC Assocs of Oswego Inc            
                                                            GC-20           1,028                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            GC-21           6,978                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-26          28,064                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-40          -1,000                  03/03/22   02/22/23    PAC Assocs of Oswego Inc            
 
22-0784SS Reconstruction               0-007-013  03/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2034FP Reconstruction               0-007-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hastings Mallory Elementary:
90-0647   Reconstruction               0-008-005  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1552   Reconstruction               0-008-007  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1683   Reconstruction               0-008-008  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0404   Reconstruction               0-008-009  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            013             1,868                  06/23/10   12/17/10    MYRIAD CONSTRUCTION INC             
                                                            016            -2,845                  03/22/10   05/26/10    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            035            13,815                  11/23/09   01/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            041            10,119                  03/17/10   05/26/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            048            -1,729                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            054            -3,690                  01/31/11   02/24/11    PAC & ASSOCIATES OF OSWEGO INC      
 
17-1953   Reconstruction               0-008-010  01/03/19  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0825   Reconstruction               0-008-011  01/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-02         19,573                  02/28/19   03/15/19    WEYDMAN ELECTRIC, INC.              
                                                            MC1-003             0                  12/14/18   01/24/19    DW & CREW mECHANICALS, INC.         
                                                            RC-005          4,989                  12/14/18   01/23/19    PULVER ROOFING CO., INC.            
                                                            SC1-007             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVATION, INC.         
 
19-1320   Reconstruction               0-008-012  05/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-03          -1,965                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-07          19,499                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-08          12,614                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-16            -891                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-25           6,857                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-26           7,050                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-27           5,585                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-28               0                  03/03/22     /  /      PAC Assoc of oswego                 
                                                            GC-28           4,014                  03/03/22     /  /      PAC Assocs of oswego Inc            
                                                            GC-33           1,357                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-33          -3,940                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-34           4,861                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-35          13,695                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-37             843                  03/03/22   02/22/23    PAC Assoc of Oswego Inc             
                                                            GC-52          16,942                  06/10/22   03/30/23    PAC Assocs of Oswego Inc            
                                                            MC-03           4,444                  02/17/22   03/28/23    Erie Mech Contrs Inc                
                                                            MC-06           5,837                  03/03/22   12/06/22    Erie Mech Contrs Inc                
 
22-0785   Reconstruction               0-008-013  03/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2030FP Reconstruction               0-008-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
00-1553   Reconstruction               0-019-003  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1684   Reconstruction               0-019-004  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0405   Reconstruction               0-019-005  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,892                  11/03/08   12/03/08    MYRIAD CONSTRUCTION INC.            
                                                            001            11,600                  11/03/08   12/03/08    CENTRAL NEW YORK CONSTRUCTION       
                                                            006             5,942                  11/03/08   04/07/09    MYRIAD CONSTRUCTION, INC.           
                                                            006             7,637                  10/13/09   11/18/09    M & N PLUMBING & HEATING INC        
                                                            009             1,750                  10/13/09   11/18/09    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            015             5,048                  01/27/10   05/10/10    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            016                 0                  06/23/10   08/17/10    M&N PLUMBING & HEATING INC          
                                                            017           -32,582                  08/13/09   09/18/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            017              -752                  06/23/10   08/17/10    M&N PLUMBING & HEATING INC          
                                                            023             1,299                  10/13/09   11/18/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            027            14,084                  10/13/09   11/18/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            044           -15,743                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            050            -9,710                  06/23/10   08/17/10    PAC & ASSOCIATES OF OSWEGO INC      
 
13-0704   Reconstruction               0-019-006  06/05/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1954   Reconstruction               0-019-007  01/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-08         19,235                  12/07/21   12/20/22    Weydman Elec Inc                    
                                                            EC2-09              0                  07/01/21   03/16/22    Weydman Electric Inc                
                                                            GC2-01           -524                  10/15/21   12/06/22    PAC&Assoc of Oswego                 
                                                            GC2-23         17,724                  10/15/21   12/06/22    PAC & Associates of Oswego          
                                                            GC2-26AA            0                  10/15/21   07/28/22    PAC Assoc of Oswego Inc             
                                                            GC2-40         10,512                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            GC2-47         10,387                  10/18/21   12/06/22    PAC & Assoc of Oswego               
                                                            MC2-03         24,827                  12/07/21   12/20/22    Eire Mech Contr Inc                 
                                                            MC2-04         25,573                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-05         32,752                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-06              0                  06/18/21   02/01/22    Erie Mechanical Contractors         
                                                            MC2-06         30,714                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-07         11,850                  06/18/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-07         29,685                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-08         26,989                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            MC2-09         24,495                  12/07/21   12/20/22    Eire Mech Contr Inc                 
                                                            MC2-13         11,850                  07/01/21   03/15/22    Erie Mechanical Contractors         
                                                            MC2-22AA            0                  12/07/21   12/20/22    Erie Mech Contr Inc                 
                                                            PC2-02            542                  06/18/21   03/15/22    Lawman Heating and Cooling          
                                                            PC2-09              0                  07/01/21   03/22/22    Lawman Heating and Cooling          
 
17-0826   Reconstruction               0-019-008  01/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1-05          8,630                  02/28/19   03/15/19    WEYDMAN ELECTRIC, INC.              
                                                            EC1-13          5,403                  12/10/19   01/09/20    WEYDMAN ELECTRIC, INC.              
                                                            MC1-05          5,403                  06/12/20   08/06/20    DW & CREW MECHANICALS, INC.         
                                                            SC1-006             0                  12/14/18   01/24/19    CUNNINGHAM EXCAVATION, INC.         
 
19-1321   Reconstruction               0-019-009  05/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-02           6,912                  02/17/22   02/14/23    Weydman Elec Inc                    
                                                            GC-01          -1,965                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-02           4,644                  02/17/22   02/16/23    PAC Assoc of oswego Inc             
                                                            GC-13           6,170                  03/03/22   02/22/23    PAC ASSOCIATES OF OSWEGO            
                                                            GC-14          25,315                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            GC-16           9,689                  02/17/22   04/05/23    PAC Assocs of Oswego Inc            
                                                            GC-24           3,803                  03/03/22     /  /      PAC Assoc of oswego Inc             
                                                            GC-27           5,565                  02/17/22   02/16/23    PAC Assocs of Oswego Inc            
                                                            GC-43          24,278                  03/03/22     /  /      PAC Assocs of Oswego Inc            
                                                            GC-45          27,957                  03/03/22   02/22/23    PAC Assocs Oswego Inc               
                                                            MC-05           8,687                  06/22/22   04/27/23    Erie Mech Contrs Inc                
                                                            PC-01               0                  02/17/22   03/28/23    HMI Mech Systems Inc                
                                                            PC-01           1,077                  02/17/22   03/28/23    HMI Mech Systems Inc                
                                                            PC-05           2,185                  02/17/22   03/28/23    HMI Mech Systems Inc                
 
20-1599   Reconstruction               0-019-010  05/18/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0786   Reconstruction               0-019-011  03/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2035FP Reconstruction               0-019-FP1  08/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stadium Building:
00-1554   New Construction             0-023-001  12/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -70,762                  02/29/08   03/15/08    MASSA CONSTRUCTION, INC             
 

          XXEducation Center (sold 03/2019):
00-1555   Reconstruction               1-004-004  12/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1685   Reconstruction               1-004-005  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0406   Reconstruction               1-004-006  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006            15,068                  04/20/09   08/04/09    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            010            11,106                  10/12/09   11/18/09    M & N PLUMBING & HEATING INC        
                                                            013             3,069                  01/27/10   05/10/10    CENTRAL NEW YORK CONSTRUCTION INC   
                                                            038           -25,484                  01/27/10   05/10/10    PAC & ASSOCIATES OF OSWEGO INC      
 

          Storage Garage at Middle School:
92-0528   New Construction             2-022-001  05/20/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXEd Center Garage (sold March 2019):
07-0407   New Construction             3-024-001  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  06/23/10   08/17/10    HOUPPERT BUILDERS INC               
                                                            013             2,303                  05/11/10   12/22/10    M&N PLUMBING & HEATING INC          
 

          Bus Garage (Maintenance Ctr):
90-0648   Reconstruction               5-009-001  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1686   Reconstruction               5-009-003  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0408   Reconstruction               5-009-004  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006           108,000                  06/30/10   12/10/10    J&A MECHANICAL CONTRACTORS INC      
                                                            007             4,482                  06/18/10     /  /      J&A MECHANICAL CONTRACTORS INC      
 

          Transportation Center:
02-1687   Reconstruction               5-020-002  09/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0409   Reconstruction               5-020-003  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            012            11,290                  01/27/10   05/10/10    CENTRAL NEW YORK CONSTRUCTION INC   
 

          District-Wide:
17-0881   Reconstruction               7-999-001  03/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            TC-01               0                  12/13/19   01/03/20    KNAPP ELECTRIC, INC.                
                                                            TC-02               0                  12/13/19   01/03/20    KNAPP ELECTRIC, INC.                
                                                            TC-03               0                  06/12/20   07/20/20    KNAPP ELECTRIC, INC.                
                                                            TC-04               0                  09/16/20   11/12/20    KNAPP ELECTRIC, INC.                
                                                            TC1-01          6,887                  09/16/20   11/12/20    KNAPP ELECTRIC, INC.                
 

MEXICO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-09-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          New Haven Elementary:
91-1221   Reconstruction               0-001-003  05/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1403   Reconstruction               0-001-004  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-H1         22,454                  02/11/02   03/26/02    Airtech Heating                     
                                                            002-E1          6,345                  02/11/02   03/26/02    Patricia Elec.                      
                                                            002-P1          6,497                  02/11/02   03/26/02    J&A Mech.                           
                                                            002-R1          5,013                  02/11/02   03/26/02    RSI Roofing                         
                                                            004-P1          2,375                  03/24/03   03/28/03    J&A Mech.                           
                                                            005-P1          3,943                  03/24/03   03/28/03    J&A Mech.                           
                                                            005-S1          5,354                  07/26/02   08/28/02    Barber Corp                         
                                                            E1-025            398                  02/24/03   03/11/03    Patricia Elec.                      
 
02-0487   Reconstruction               0-001-005  04/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02           51,000                  08/28/03   09/09/03    Barber Corp                         
                                                            1-04           10,266                  12/16/03   12/30/03    Barber Corp                         
                                                            1-07              -10                  10/29/04   11/19/04    Barber Corp                         
                                                            2-01           11,837                  12/08/04   06/13/05    M and n plumbing                    
                                                            4-02            6,002                  03/17/04   04/23/04    Rombough Elec.                      
 
06-0198   Reconstruction               0-001-007  11/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0949   Reconstruction               0-001-008  07/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0200   Reconstruction               0-001-009  12/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02            5,000                  08/17/10   09/28/10    PAC & ASSOCIATES INC                
                                                            1-05            7,875                  09/01/10   09/24/10    PAC & ASSOCIATES INC                
                                                            1-08           29,327                  02/17/11   03/04/11    PAC & ASSOCIATES INC                
                                                            1-13            1,088                  03/18/11   09/21/11    PAC & ASSOCIATES INC                
                                                            1-16            4,147                  04/27/11   05/13/11    PAC & ASSOCIATES INC                
                                                            4-01                0                  04/13/12   09/07/12    KNAPP ELECTRIC INC                  
                                                            4-05              848                  07/11/11   08/16/11    KNAPP ELECTRIC INC                  
                                                            5-01             -738                  07/13/10   11/17/10    RSI ROOFING                         
                                                            6-01          -16,221                  04/13/12   08/30/12    DAVIS WALLBRIDGE INC                
                                                            6-02           21,000                  07/13/10   11/17/10    DAVIS WALLBRIDGE INC                
                                                            6-03              766                  08/10/10   09/23/10    DAVIS WALLBRIDGE INC                
                                                            AA 1-02          -456                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 1-01        22,782                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 1-03        -2,996                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 1-05        -4,348                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 2-05             0                  04/13/12   09/07/12    KING & KING MECHANICAL INC          
                                                            FO 3-03             0                  04/13/12   09/07/12    HYDE STONE MECHANICAL CONTRACTORS   
                                                            FO 3-05             0                  04/13/12   09/07/12    HYDE STONE MECHANICAL CONTRACTORS   
                                                            FO 4-03             0                  04/13/12   09/07/12    KNAPP ELECTRIC INC                  
                                                            FO 5-03        -1,352                  04/13/12   08/30/12    RSI ROOFING INC                     
                                                            FO 6-01        -3,500                  04/13/12   08/30/12    DAVIS WALLBRIDGE INC                
                                                            FO 6-02        -2,565                  04/13/12   08/30/12    DAVIS WALLBRIDGE INC                
 
08-0046   Reconstruction               0-001-010  07/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0118   Reconstruction               0-001-011  10/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-07            5,266                  01/13/15   01/20/15    Myraid Construction, Inc.           
 
13-1193   Reconstruction               0-001-012  04/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-01                0                  08/15/18   09/24/18    TITAN ROOFING                       
 
14-0819   Reconstruction               0-001-013  10/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Palermo Elementary School:
91-1222   Reconstruction               0-002-003  05/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1246   Reconstruction               0-002-005  05/08/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1404   Reconstruction               0-002-006  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004-S1/        17,162                  06/25/02   07/15/02    Barber Corp                         
 
02-0488   Reconstruction               0-002-007  04/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-05            4,617                  10/29/04   11/19/04    Barber Corp                         
                                                            1-06            1,007                  10/29/04   11/19/04    Barber Corp                         
                                                            3-01           13,830                  12/11/03   11/05/04    Oswego Mechanical                   
                                                            3-02            2,734                  07/07/05   07/25/05    oswego mechanical                   
                                                            4-01              556                  12/11/03   01/06/04    Rombough Electric                   
                                                            4-03            3,351                  03/17/04   09/27/04    Rombough Electric                   
                                                            5-02           17,365                  11/04/04   11/19/04    J&B Installation                    
 
06-0199   Reconstruction               0-002-008  11/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0080   Reconstruction               0-002-009  08/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01                0                  12/14/05   04/21/06    C and S plumbing Mechanical         
                                                            1-02              220                  05/16/06   07/20/06    C and S Plumbing Mechanical         
 
06-0950   Reconstruction               0-002-010  07/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0201   Reconstruction               0-002-011  12/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            5,215                  07/22/10   08/24/10    PAC & ASSOCIATES INC                
                                                            1-04            9,450                  09/01/10   05/18/11    PAC & ASSOCIATES INC                
                                                            1-06            8,729                  09/01/10   09/24/10    PAC & ASSOCIATES INC                
                                                            1-12            4,703                  03/18/11   09/21/11    PAC & ASSOCIATES INC                
                                                            2-02            5,011                  01/31/11   03/03/11    KING & KING MECHANICAL INC          
                                                            2-03                0                  04/13/12   09/07/12    KING & KING MECHANICAL INC          
                                                            3-01                0                  04/13/12   09/07/12    HYDE STONE MECHANICAL CONTRACTORS   
                                                            4-02                0                  04/13/12   09/07/12    KNAPP ELECTRIC INC                  
                                                            4-03            4,172                  06/15/11   07/01/11    KNAPP ELECTRIC INC                  
                                                            4-07            2,493                  07/11/11   08/16/11    KNAPP ELECTRIC INC                  
                                                            5-02             -369                  07/13/10   11/17/10    RSI ROOFING                         
                                                            AA 1-01        -4,990                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 1-06        -2,991                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 1-07          -430                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 5-04        -1,639                  04/13/12   08/30/12    RSI ROOFING INC                     
 
13-0119   Reconstruction               0-002-012  10/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-06            6,709                  01/13/15   01/20/15    Myraid Construction, Inc.           
 
13-1194   Reconstruction               0-002-013  04/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -2,795                  11/10/16   11/16/16    Titan Roofing                       
                                                            00001               0                  11/10/16   11/16/16    Black Horse Group                   
                                                            00005             478                  01/11/17   08/30/17    Titan Roofing                       
                                                            R-03                0                  08/15/18   09/24/18    TITAN ROOFING                       
                                                            RC-04               0                  08/15/18   09/24/18    TITAN ROOFING                       
 
14-0820   Reconstruction               0-002-014  10/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mexico Elementary School:
91-1223   Reconstruction               0-003-003  05/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1406   Additions and Alterations    0-003-004  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-GC1         7,430                  02/24/03   03/11/03    Barber Corp                         
                                                            003-H-1         2,484                  01/30/03   02/11/03    Airtech Heating                     
                                                            003-R1          1,804                  07/01/03   07/07/03    RSI Roofing                         
                                                            007-GC1         2,930                  05/19/03   06/02/03    Barber Corp                         
                                                            008-S1           -604                  01/23/04   02/17/04    Barber Corp                         
                                                            E1-024          2,037                  02/24/03   03/11/03    Patricia Elec.                      
                                                            E1-031          1,268                  02/24/03   03/11/03    Patricia Elec.                      
                                                            SI-011          4,770                  02/24/03   03/11/03    Barber Corp                         
 
99-9999   Additions and Alterations    0-003-005  04/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0200   Reconstruction               0-003-008  11/09/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            #1 - ELE       -2,218                  09/20/07   10/18/07    PATRCIA ELECTRIC, INC.              
 
06-0951   Reconstruction               0-003-009  07/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0202   Reconstruction               0-003-010  12/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-09            1,085                  02/17/11   03/04/11    PAC & ASSOCIATES INC                
                                                            1-14            8,210                  03/18/11   09/21/11    PAC & ASSOCIATES INC                
                                                            1-15           10,936                  04/06/11   04/21/11    PAC & ASSOCIATES INC                
                                                            1-17            1,300                  01/09/12   05/01/12    PAC & ASSOCIATES INC                
                                                            1-18           -1,891                  01/13/12   06/22/12    PAC & ASSOCIATES INC                
                                                            2-01            9,947                  01/31/11   03/03/11    KING & KING MECHANICAL INC          
                                                            2-01                0                  04/13/12   09/07/12    KING & KING MECHANICAL INC          
                                                            2-02                0                  04/13/12   09/07/12    KING & KING MECHANICAL INC          
                                                            4-01          -15,867                  11/03/10   11/12/10    KNAPP ELECTRIC INC                  
                                                            4-02            2,404                  04/27/11   05/13/11    KNAPP ELECTRIC INC                  
                                                            4-04                0                  04/13/12   09/07/12    KNAPP ELECTRIC INC                  
                                                            4-06            1,172                  07/11/11   08/16/11    KNAPP ELECTRIC INC                  
                                                            5-03            6,539                  12/17/10   02/11/11    RSI ROOFING                         
                                                            6-04           16,558                  09/27/10   11/05/10    DAVIS WALLBRIDGE INC                
                                                            AA 5-01          -650                  04/13/12   08/30/12    RSI ROOFING INC                     
                                                            FO 1-02        -1,794                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 3-04             0                  04/13/12   09/07/12    HYDE STONE MECHANICAL CONTRACTORS   
                                                            FO 4-01             0                  04/13/12   09/07/12    KNAPP ELECTRIC INC                  
                                                            FO 4-02             0                  04/13/12   09/07/12    KNAPP ELECTRIC INC                  
                                                            FO 5-02          -808                  04/13/12   08/30/12    RSI ROOFING INC                     
                                                            FO 6-02        -1,980                  04/13/12   08/30/12    DAVIS WALLBRIDGE INC                
 
13-0120   Reconstruction               0-003-011  10/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1-06            6,345                  09/05/14   09/29/14    Contental Construction, LLC         
                                                            2-05            4,488                  01/13/15   01/20/15    Myraid Construction, Inc.           
 
13-1195   Reconstruction               0-003-012  04/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-02                0                  08/15/18   09/24/18    TITAN ROOFING                       
 
14-0821   Reconstruction               0-003-013  10/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1521   Reconstruction               0-003-014  10/03/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5-01            3,703                  01/23/19   03/12/19    FIELDTURF USA, INC.                 
 
20-0154   Reconstruction               0-003-017  09/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -6,641                  09/07/22   08/22/23    Industry Standard USA LLC           
                                                            101-01AA            0                  03/18/22   04/04/23    Indst Stand USA LLC                 
                                                            2-01           -6,000                  09/07/22   05/31/23    Erie Mech Contrs Inc                
                                                            301-01           -521                  09/07/22   05/31/23    HMI Mech Systems Inc                
                                                            301-01AA            0                  03/18/22   04/04/23    HMI Mech Systems Inc                
                                                            4-01            5,490                  09/07/22   05/31/23    MEID Elec LLC                       
                                                            4-02           -1,767                  09/07/22   05/31/23    MEID Elec LLC                       
                                                            4-03              839                  09/07/22   05/31/23    MEID Elec LLC                       
                                                            401-01AA            0                  03/18/22   04/04/23    MEID Elec LLC                       
 
21-0007   Reconstruction               0-003-018  07/28/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1741   Reconstruction               0-003-019  04/25/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mexico High School:
91-1165   Reconstruction               0-004-004  05/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1585   Reconstruction               0-004-005  07/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1408   Additions and Alterations    0-004-006  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-S11       -28,122                  01/23/04   02/17/04    Ruston Paving                       
                                                            002-S11        -1,500                  10/20/04   10/25/04    Ruston Paving                       
                                                            002FSE1        -2,097                  03/28/02   04/26/02    Buffalo Hotel Supply                
                                                            003-E1/         2,767                  08/28/02   09/05/02    Patricia Elec.                      
                                                            004-E1          2,405                  11/18/02   01/03/03    Patricia Elec.                      
                                                            004-H1            421                  04/17/03   04/30/03    Airtech Heating                     
                                                            005-E1          3,442                  02/24/03   03/11/03    Patricia Elec.                      
                                                            005-GC1        -1,899                  04/17/03   04/30/03    Barber Corp.                        
                                                            008-GC1        22,500                  05/19/03   09/05/03    Barber Corp                         
                                                            GC1-032           106                  02/24/03   03/11/03    Barber Corp                         
 
02-0489   Reconstruction               0-004-008  04/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           37,000                  08/28/03   09/05/03    Barber Corp                         
                                                            1-03           17,004                  12/11/03   06/14/05    Barber Corp                         
                                                            5-03           12,875                  11/04/04   11/19/04    J&B Installation                    
                                                            5-04            9,996                  01/05/04   06/14/05    J and B Installation                
 
06-0952   Reconstruction               0-004-010  07/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1672   Reconstruction               0-004-011  08/06/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01             -594                  10/14/08   10/28/08    JOHN R. WILKINS CONSTRUCTION        
 
09-1187   Additions and Alterations    0-004-012  02/11/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           18,692                  08/26/11   09/14/11    BETTE & CRING INC                   
                                                            1-02            7,783                  12/07/11   02/28/12    BETTE & CRING,INC.                  
                                                            1-03            7,044                  12/07/11   02/23/12    BETTE & CRING,INC.                  
                                                            1-04            1,129                  03/01/12   07/23/12    BETTE & CRING INC                   
                                                            1-05            2,740                  10/02/12   02/25/13    BETTE & CRING INC                   
                                                            1-06             -642                  10/02/12   02/25/13    BETTE & CRING INC                   
                                                            1-07          -92,095                  11/20/12   03/01/13    BETTE & CRING INC                   
                                                            1-08               24                  05/23/13   07/03/13    Bette & Cring, INC.                 
                                                            1-09              218                  05/23/13   10/29/14    Bette & Cring, INC.                 
                                                            1-10               37                  05/23/13   07/03/13    Bette & Cring, INC.                 
                                                            1-11             -236                  05/23/13   07/03/13    Bette & Cring, INC.                 
                                                            1-12               56                  05/23/13   07/03/13    Bette & Cring, INC.                 
                                                            1-13          -28,093                  11/06/13   11/27/13    BETTE & CRING INC                   
                                                            1-14          -19,128                  04/28/14   06/09/14    Bette & Cring, Inc.                 
                                                            1-15          -16,956                  04/28/14   06/09/14    Bette & Cring, Inc.                 
                                                            100-01              0                  05/29/15   06/18/15    Bette & Cring Inc.                  
                                                            100-02              0                  05/29/15   06/18/15    Bette & Cring Inc.                  
                                                            100-03              0                  05/28/15   06/18/15    Bette & Cring Inc.                  
                                                            100-04              0                  05/29/15   06/18/15    Bette & Cring Inc.                  
                                                            100-05              0                  05/29/15   06/18/15    Bette & Cring Inc.                  
                                                            100-06              0                  05/29/15   06/18/15    Bette & Cring Inc.                  
                                                            100-07              0                  05/28/15   06/18/15    Bette & Cring Inc.                  
                                                            100-08              0                  05/29/15   06/18/15    Bette & cring Inc.                  
                                                            100-09              0                  05/29/15   06/18/15    Bette & Cring Inc.                  
                                                            2-01           -5,434                  10/04/12   02/11/13    LAWMAN HEATING & COOLING INC        
                                                            2-02           33,463                  11/20/12   03/01/13    LAWMAN HEATING & COOLING INC        
                                                            2-03            2,927                  10/11/13   11/12/13    LAWMAN HEATING & COOLING INC        
                                                            200-01              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-02              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-03              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-04              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-05              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-06              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-07              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-08              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-09              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-10              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            200-11              0                  02/13/14   03/21/14    Lawman Heating & Cooling, Inc.      
                                                            3-01             -401                  08/26/11   12/14/11    BROSH MECHANICAL INC                
                                                            3-02            4,120                  10/05/11   12/13/11    BROSH MECHANICAL INC                
                                                            3-03            2,681                  03/01/12   07/17/12    BROSH MECHANICAL INC                
                                                            3-04           -6,000                  04/01/13   06/19/13    BROSH MECHANICAL INC                
                                                            3-05           -3,107                  04/30/13   07/12/13    BROSH MECHANICAL INC                
                                                            300-01              0                  05/29/15   06/18/15    Brosh Mechanical Inc.               
                                                            300-02              0                  05/29/15   06/18/15    Brosh Mechanical Inc.               
                                                            300-03              0                  05/29/15   06/18/15    Brosh Mechanical Inc.               
                                                            300-04              0                  05/29/15   06/18/15    Brosh Mechanical Inc.               
                                                            300-05              0                  05/29/15   06/18/15    Brosh Mechanical Inc.               
                                                            4-01           -2,936                  06/10/11   11/28/14    HUEN NEW YORK INC                   
                                                            4-01                0                  02/13/14   03/21/14    Huen New York, Inc.                 
                                                            4-02            3,780                  01/31/12   04/19/12    HUEN NEW YORK INC                   
                                                            4-03           -2,358                  06/01/12   10/22/12    HUEN NEW YORK INC                   
                                                            4-04           13,613                  07/26/12   01/15/13    HUEN NEW YORK INC                   
                                                            4-05           -3,608                  01/23/14   02/20/14    Huen New York, Inc.                 
                                                            400-007             0                  02/13/14   03/21/14    Huen New York, Inc.                 
                                                            400-02              0                  02/13/14     /  /      Huen New York, Inc.                 
                                                            400-03              0                  02/13/14   03/21/14    Huen New York, Inc.                 
                                                            400-04              0                  02/13/14   03/21/14    Huen New York, Inc.                 
                                                            400-05              0                  02/13/14   03/21/14    Huen New York, Inc.                 
                                                            400-06              0                  02/13/14   03/21/14    Huen New York, Inc.                 
                                                            400-08              0                  02/13/14   03/21/14    Huen New York. Inc.                 
                                                            400-09              0                  02/13/14   03/21/14    Huen New York, Inc.                 
                                                            9-01            4,132                  06/11/13   07/26/13    Acts II Construction, Inc.          
                                                            9-02            8,495                  09/26/13   10/17/13    Acrs II Construction  Inc.          
 
11-0755   Reconstruction               0-004-013  07/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0069   Reconstruction               0-004-014  07/22/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1312   Reconstruction               0-004-015  06/08/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            8,701                  09/24/12   01/24/13    NIRAM INC                           
                                                            1-02            2,700                  10/02/12   02/22/13    NIRAM INC                           
                                                            1-03          -39,002                  12/13/13   01/10/14    Nuram, Inc.                         
 
13-0121   Reconstruction               0-004-016  10/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-05            2,359                  09/05/14   09/29/14    Contiental Construction, LLC        
                                                            2-04           -2,346                  01/13/15   01/20/15    Myraid Construction, Inc.           
                                                            2-09            5,368                  02/03/15   02/05/15    Myraid Construction, Inc.           
                                                            202-001             0                  05/28/15   06/18/15    Myriad Construction Inc.            
 
13-1196   Reconstruction               0-004-017  04/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00003           2,308                  11/10/16   11/16/16    Titan Roofing                       
                                                            00005             478                  01/11/17   08/30/17    Titan Roofing                       
                                                            00006           6,497                  01/11/17   08/30/17    Titan Roofing                       
                                                            00007             -71                  01/11/17   08/30/17    Titan Roofing                       
                                                            GC-14          14,928                  01/25/17   08/30/17    Bette & Cring Construction Group    
                                                            GC-19           2,649                  01/25/17   08/30/17    Bette & Cring Construction Group    
                                                            GC-20           6,459                  01/25/17   08/30/17    Bette & Cring Construction Group    
                                                            GC-22           6,459                  01/25/17   08/30/17    Bette & Cring Construction Group    
                                                            GC-23          81,895                  01/25/17   08/30/17    Bette & Cring Construction Group    
                                                            GC-24          37,161                  01/25/17   08/30/17    Bette & Cring Construction Group    
                                                            GC-25          31,039                  01/25/17   08/30/17    Bette & Cring Construction Group    
                                                            GC-33           1,294                  02/28/17   06/06/17    Bette & Cring Construction Group    
                                                            GC-34           2,340                  02/28/17   06/06/17    Bette & Cring Construction Group    
                                                            GC-38             891                  04/27/17   06/06/17    Bette & Cring Construction Group    
                                                            P-05              340                  08/15/18   02/06/19    BROSH MECHANICAL, INC.              
 
14-0177   Reconstruction               0-004-018  04/28/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,075                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-02             673                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-03           1,408                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-04          -1,500                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-05          13,282                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-06           2,034                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-07             661                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-08           2,323                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-09             877                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-10R         17,531                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-11           9,080                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-12           1,069                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-13           2,765                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-14           1,007                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-15             568                  01/25/17   02/16/17    Patricia Electric, Inc.             
                                                            EC-16             275                  02/28/17   04/13/17    Patricia Electric, Inc.             
                                                            EC-17           2,645                  02/28/17   04/13/17    Patricia Electric, Inc.             
                                                            EC-18           7,355                  04/27/17   05/10/17    Patricia Electric, Inc.             
                                                            EC-19           1,575                  04/27/17   05/10/17    Patricia Electric, Inc.             
                                                            EC-20           5,083                  04/27/17   05/10/17    Patricia Electric, Inc.             
                                                            EC-21             460                  04/27/17   05/10/17    Patricia Electric, Inc.             
                                                            EC-22             527                  04/27/17   05/10/17    Patricia Electric, Inc.             
                                                            EC-23           5,416                  08/31/17   09/14/17    Patricia Electric Inc.              
                                                            EC-24           1,738                  08/31/17   09/14/17    Patricia Electric Inc.              
                                                            GC-01          20,280                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-02           7,658                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-03           7,212                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-04          -1,759                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-05          11,246                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-06           2,588                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-07           2,119                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-08             888                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-09             812                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-10         101,323                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-11             520                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-12               0                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-13          13,125                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-15             624                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-16             532                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-17               0                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-18             436                  01/25/17   10/28/19    Bette & Cring Construction Group    
                                                            GC-21           5,997                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-26           1,470                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-27           3,162                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-28           1,338                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-29           3,198                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-30           5,066                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-31           6,970                  01/25/17   01/27/17    Bette & Cring Construction Group    
                                                            GC-32             862                  02/28/17   03/06/17    Bette & Cring Construction Group    
                                                            GC-35          -1,632                  02/28/17   03/06/17    Bette & Cring Construction Group    
                                                            GC-36          -1,183                  04/27/17   05/02/17    Bette & Cring Construction Group    
                                                            GC-37         -15,714                  04/27/17   05/02/17    Bette & Cring Construction Group    
                                                            GC-39           2,221                  04/27/17   05/02/17    Bette & Cring Construction Group    
                                                            GC-40             382                  04/27/17   05/02/17    Bette & Cring Construction Group    
                                                            GC-41          -5,083                  04/27/17   05/02/17    Bette & Cring Construction Group    
                                                            GC-42             755                  04/27/17   05/02/17    Bette & Cring Construction Group    
                                                            GC-43          10,088                  08/31/17   09/06/17    Bette & Cring Construction Group    
                                                            GC-44             560                  08/31/17   09/14/17    Bette & Cring Construction Group    
                                                            GC-45            -440                  08/31/17   09/06/17    Bette & Cring Construction Group    
                                                            GC-46           2,392                  08/31/17   09/14/17    Bette & Cring Construction Group    
                                                            MC-01          13,860                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-02          11,865                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-03           4,147                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-04             189                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-05           6,363                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-06           3,688                  01/25/17   01/27/17    DW & Crew Mechanicals, Inc.         
                                                            MC-07           4,182                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-08           1,858                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-09          -2,894                  01/25/17   02/16/17    DW & Crew Mechanicals, Inc.         
                                                            MC-10           2,721                  02/28/17   04/13/17    DW & Crew Mechanicals, Inc.         
                                                            MC-11           2,023                  02/28/17   04/13/17    DW & Crew Mechanicals, Inc.         
                                                            MC-12             747                  02/28/17   04/13/17    DW & Crew Mechanicals, Inc.         
                                                            MC-13            -450                  04/27/17   05/10/17    DW & Crew Mechanicals, Inc.         
                                                            MC-14          -2,160                  04/27/17   05/10/17    DW & Crew Mechanicals, Inc.         
                                                            MC-15R            389                  08/31/17   09/14/17    DW & Crew Mechanicals, Inc.         
                                                            MC-16            -316                  08/31/17   09/14/17    DW & Crew Mechaanicals, Inc.        
                                                            MC-17               0                  08/31/17   09/14/17    DW & Crew Mechanicals, Inc.         
                                                            MC-18            -100                  08/31/17   09/14/17    DW & Crew Mechanicals, Inc.         
                                                            PC-01           1,260                  01/25/17   02/16/17    Brosh Mechanical, Inc.              
                                                            PC-02               0                  01/25/17   02/16/17    Brosh Mechanical, Inc.              
                                                            PC-03            -250                  01/25/17   02/16/17    Brosh Mechanical, Inc.              
                                                            PC-04               0                  08/31/17   09/14/17    Brosh Mechanical Incorporated       
 
15-0270   Reconstruction               0-004-019  02/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           4,304                  03/05/18   03/13/18    FieldTurfUSA, Inc.                  
                                                            00003R         11,037                  03/05/18   03/13/18    FieldTurfUSA, Inc.                  
                                                            00004           3,500                  03/05/18   03/13/18    FieldTurfUSA, Inc.                  
                                                            00005           5,011                  03/05/18   03/13/18    FieldTurfUSA, Inc.                  
                                                            00006          -3,807                  03/05/18   03/13/18    FieldTurfUSA, Inc.                  
                                                            00007          10,190                  03/05/18   03/13/18    FieldTurfUSA, Inc.                  
                                                            2S-01          25,728                  01/23/19   02/11/19    DANT CLAYTON                        
 
16-2065   Reconstruction               0-004-020  08/24/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0027   Reconstruction               0-004-021  08/03/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           137,923                  10/11/17   11/27/17    Ruston Paving Company, Inc.         
 
18-0312   Reconstruction               0-004-022  05/03/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1694FA Reconstruction               0-004-023  04/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mexico Middle School:
91-1166   Reconstruction               0-005-002  05/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1407   Additions and Alterations    0-005-003  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-GC1        16,670                  12/06/01   02/21/02    Barber Corp                         
                                                            002-S1         21,965                  12/06/01   02/21/02    Barber Corp                         
                                                            005-H1          3,439                  04/17/03   04/30/03    Airtech Heating                     
                                                            006-GC1         1,203                  04/17/03   04/30/03    Barber Corp                         
                                                            006-S1          2,725                  01/28/03   02/11/03    Barber Corp                         
                                                            S1-011a         3,685                  02/24/03   03/04/03    Barber Corp                         
                                                            Si-027            380                  02/24/03   03/11/03    Barber Corp                         
 
02-0490   Reconstruction               0-005-004  04/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5-01            1,622                  11/07/03   12/17/03    J&B Installation                    
 
06-0201   Reconstruction               0-005-005  11/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0953   Reconstruction               0-005-006  07/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1188   Additions and Alterations    0-005-007  11/28/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            9,123                  04/30/13   07/15/13    BACON & SEILER CONSTRUCTORS         
                                                            1-01              490                  09/30/14   10/08/14    Patricia Electric, Inc.             
                                                            1-02           19,649                  06/19/13   08/21/13    Bacon & Seiler Constructors         
                                                            1-03           19,900                  10/03/13   10/24/13    Bacon & Seiler Constructors         
                                                            1-04            3,505                  10/17/13   12/16/13    BACON & SEILER CONSTRUCTORS         
                                                            1-05           17,284                  12/13/13   01/22/14    Bacon & Seiler Constructors         
                                                            1-06           15,540                  12/13/13   01/22/14    Bacon & Seiler Constructors         
                                                            1-07           17,620                  12/13/13   01/22/14    Bacon & Silier Constructors         
                                                            1-08            6,363                  12/12/13   01/22/14    Bacon & Seiler Constructors         
                                                            1-09           19,410                  03/06/14   04/04/14    Bacon & Seiler Constructors         
                                                            1-10           15,821                  03/14/14   04/07/14    Bacon & Seiler Constructors         
                                                            1-11           23,413                  04/24/14   05/16/14    Bacon & Seiler Constructors         
                                                            1-12           19,275                  04/24/14   10/28/14    Bacon & Seiler Constructors         
                                                            1-13           20,419                  04/24/14   05/05/14    Bacon & Seiler Constructors         
                                                            1-14           19,790                  05/09/14   05/21/14    Bacon & Seiler Constructors         
                                                            100-01              0                  05/29/15   06/18/15    Bacon & Seiler Constructors         
                                                            100-02              0                  05/29/15   07/22/15    Bacon & Seiler Constuctors          
                                                            100-03              0                  05/29/15   07/22/15    Bacon & Seiler Constructors         
                                                            100-04              0                  05/29/15   07/22/15    Bacon & Seiler Constructors         
                                                            100-05              0                  05/29/15   06/18/15    Bacon & Seiler Constructors         
                                                            100-06              0                  05/29/15   06/18/15    Bacon & Seiler Constructors         
                                                            2-01         -100,000                  07/10/12   11/13/12    DW & CREW MECHANICALS               
                                                            2-02           21,322                  10/30/13   02/20/14    DW & Crew Mechanicals               
                                                            2-03           20,898                  10/31/13   01/03/14    DW & Crew Mechanicals               
                                                            2-04           11,397                  04/08/14   04/30/14    DW & Crew Mechanicals               
                                                            2-05           -9,115                  11/03/14   11/07/14    D&W Crew Mechanicals                
                                                            200-01              0                  05/29/15   06/18/15    DW & Crew Mechanicals               
                                                            200-02              0                  05/29/15   06/18/15    DW & Crew Mechanicals               
                                                            200-03              0                  05/29/15   06/18/15    DW & Crew Mechanicals               
                                                            200-04              0                  06/29/15   06/18/15    DW & Crew Mechanicals               
                                                            3-01           15,570                  09/16/13   06/17/16    Hyde Stone Mechanical Cont.         
                                                            3-02           17,144                  03/14/14   04/07/14    Hyde-Stone Mechanical Constractors  
                                                            301-01              0                  05/29/15   06/18/15    Hyde Stone Mechanical Contractors   
                                                            301-02              0                  05/29/15   06/18/15    Hyde Stone Mechanical Contractors   
                                                            301-03              0                  05/29/15   06/18/15    Hyde Stone Mechancial Contractors   
                                                            302-01              0                  05/29/15   06/17/16    Hyde Stone Mechanical Contractors   
                                                            4-01           22,471                  08/09/13   08/26/13    Weydman Electric                    
                                                            4-02           40,000                  09/16/13   02/20/14    Weydman Electric                    
                                                            4-03           17,523                  03/31/14   05/16/14    Weydman Electric                    
                                                            4-04           -2,294                  03/25/15   04/28/15    Weydman Electric                    
                                                            4-05            1,952                  03/25/15   04/28/15    Weydman Electric                    
                                                            4-1-01         19,594                  09/04/13   09/09/13    Bellows Construction Specialities, L
                                                            4-1-02         11,977                  09/04/13   09/09/13    Bellows Construction Specialities, L
                                                            4-1-03          8,490                  10/15/13   11/15/13    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            4-1-04         17,817                  12/02/13   12/24/13    Bellows Construction Specialties    
                                                            4-1-05          8,005                  12/23/13   01/22/14    Bellows Construction Specialties    
                                                            4-1-06         16,844                  05/15/14   05/30/14    Bellows Construction Specialities, L
                                                            4-101-01            0                  12/18/13   01/22/14    Bellows Construction Specialties,LLC
                                                            4-2-01         48,288                  09/04/13   02/20/14    DW & Crew Mechanicals               
                                                            4-2-02          9,021                  09/26/13   02/20/14    DW & Crew Mechanicals               
                                                            4-2-03          5,796                  11/18/13   12/03/13    DW & Crew Mechanicals               
                                                            4-2-04         -4,624                  05/09/14   05/21/14    DW & Crew Mechanicals               
                                                            4-3-01         25,382                  09/16/13   01/03/14    J&A Mechanical Contractors          
                                                            4-3-02         13,359                  12/02/13   01/03/14    J & A Mechanical Contractors, Inc.  
                                                            4-3-03         -6,000                  06/17/14   07/31/14    J & A Mechanical Contracotrs, Inc.  
                                                            4-4-01         19,669                  09/05/13   04/19/18    Watson Electric                     
                                                            4-4-02         17,951                  10/03/13   10/17/13    Watson Electric                     
                                                            4-4-03         13,562                  11/27/13     /  /      WATSON ELECTRIC                     
                                                            4-4-04          7,456                  01/16/14   02/14/14    Watson Electric                     
                                                            4-4-05           -871                  03/19/14   05/30/14    Watson Electric                     
                                                            4-401-01            0                  01/06/14   01/05/15    Watson Electric                     
                                                            4-5-01         17,145                  03/27/14   04/10/14    Northeast Interior Systems, Inc.    
                                                            4-5-02         -2,631                  11/03/14   01/13/15    Northeast Interior Systems, Inc.    
                                                            400-01              0                  05/29/15   08/04/15    Weydman Electric Inc.               
                                                            400-02              0                  05/29/15   02/04/16    Weydman Electric Inc.               
                                                            400-03              0                  05/29/15   06/18/15    Weydman Electric Inc.               
                                                            400-04              0                  05/29/15   06/18/15    Weydman Electric Inc.               
                                                            6-01          -12,262                  11/14/14   11/21/14    Syracuse Scenery & Stage Lighting   
                                                            8-01           23,984                  11/07/13   11/27/13    EV Roofing & Construction Supply    
 
13-0122   Reconstruction               0-005-008  10/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-03           -5,404                  07/25/14   08/20/14    Contiental Construction, LLC.       
                                                            1-04            3,625                  09/05/14   09/08/14    Contiental Construction, LLC        
                                                            1-07          -11,764                  01/22/15   01/23/15    Continental Construction, LLC.      
                                                            2-01          -36,240                  03/14/14   04/15/14    Myraid Construction, Inc.           
                                                            2-02           -3,434                  01/13/15   01/20/15    Myraid Construction, Inc.           
                                                            2-08            4,268                  01/22/15   01/23/15    Myraid Construction, Inc.           
                                                            202-02              0                  05/28/15   06/18/15    Myriad Construction Inc.            
                                                            202-03              0                  05/28/15   06/18/15    Myriad Construction Inc.            
 
13-1197   Reconstruction               0-005-009  04/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          -1,997                  11/10/16   11/16/16    Titan Roofing                       
                                                            00004             472                  11/10/16   11/16/16    Titan Roofing                       
                                                            P-09            1,238                  08/15/18   02/06/19    BROSH MECHANICAL, INC.              
                                                            P-10              255                  08/15/18   02/06/19    BROSH MECHANICAL, INC.              
                                                            R-05                0                  08/15/18   09/24/18    TITAN ROOFING                       
 
13-1625   Reconstruction               0-005-010  02/26/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           5,834                  11/10/16   11/28/16    Brosh Mechanical Incorporated       
                                                            00002               0                  11/10/16   11/28/16    Black Horse Group                   
                                                            00002            -205                  11/10/16   11/28/16    Brosh Mechanical Incorporated       
                                                            00003         -14,320                  11/10/16   11/28/16    Black Horse Group                   
                                                            00003             929                  11/10/16   11/28/16    Brosh Mechanical Incorporated       
                                                            00004            -200                  11/10/16   11/28/16    Black Horse Group                   
                                                            00005            -217                  11/10/16   11/28/16    Black Horse Group                   
                                                            00006          11,553                  11/10/16   11/28/16    Black Horse Group                   
                                                            00008           6,489                  11/10/16   11/28/16    Black Horse Group                   
                                                            00009           2,631                  11/10/16   11/28/16    Black Horse Group                   
                                                            00010           1,960                  11/10/16   11/28/16    Black Horse Group                   
                                                            00011           3,392                  11/10/16   11/28/16    Black Horse Group                   
                                                            00012           9,828                  11/10/16   11/28/16    Black Horse Group                   
                                                            00013             469                  11/10/16   11/28/16    Black Horse Group                   
                                                            00014           1,389                  11/10/16   11/28/16    Black Horse Group                   
                                                            00015             161                  11/10/16   11/28/16    Black Horse Group                   
                                                            00016             288                  11/10/16   11/28/16    Black Horse Group                   
                                                            00017             528                  11/10/16   11/28/16    Black Horse Group                   
                                                            00018           3,928                  11/10/16   11/28/16    Black Horse Group                   
                                                            00019           1,594                  01/11/17   01/17/17    Black Horse Group                   
                                                            00020            -509                  01/11/17   01/17/17    Black Horse Group                   
                                                            00021           1,628                  01/11/17   08/24/17    Black Horse Group                   
                                                            00022           2,026                  01/11/17   08/24/17    Black Horse Group                   
                                                            CO P-04        -2,026                  01/11/17   08/24/17    Brosh Mechanical Incorporated       
                                                            CO P-05           791                  02/28/17   06/06/17    Brosh Mechanical Incorporated       
                                                            CO P-06          -816                  04/27/17   06/06/17    Brosh Mechanical, Inc.              
                                                            CO P-07R       -8,179                  04/27/17   06/06/17    Brosh Mechanical, Inc.              
                                                            E-01                0                  08/15/18   09/24/18    WEYDMAN ELECTRIC                    
                                                            E-02                0                  08/15/18   09/24/18    WEYDMAN ELECTRIC                    
                                                            E-03                0                  08/15/18   09/24/18    WEYDMAN ELECTRIC                    
                                                            E-04                0                  08/15/18   09/24/18    WEYDMAN ELECTRIC                    
                                                            EC-01         -11,918                  02/28/17   06/06/17    Weydman Electric                    
                                                            GC-01             470                  08/15/18   02/06/19    BLACK HORSE GROUP                   
                                                            GC-02               0                  08/15/18     /  /      BLACK HORSE GROUP                   
                                                            GC-03               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
                                                            GC-04             303                  08/15/18   02/06/19    BLACK HORSE GROUP                   
                                                            GC-05               0                  08/15/08   02/22/19    BLACK HORSE GROUP                   
                                                            GC-07               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
                                                            GC-08               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
                                                            GC-09               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
                                                            GC-10               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
                                                            GC-11               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
                                                            GC-12           3,456                  08/15/18   02/12/19    BLACK HORSE GROUP                   
                                                            GC-13               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
                                                            GC-14               0                  08/15/18   02/22/19    BLABK HORSE GROUP                   
                                                            GC-15          36,770                  08/15/18   02/12/19    BLACK HORSE GROUP                   
                                                            GC-23            -791                  02/28/17   06/06/17    Black Horse Group                   
                                                            H-01                0                  08/15/18   10/01/18    DW & CREW                           
                                                            H-02                0                  08/15/18   10/01/18    DW & CREW                           
                                                            H-03                0                  08/15/18   10/01/18    DW & CREW                           
                                                            H-04                0                  08/15/18   10/01/18    DW & DREW                           
                                                            HC-01         -43,432                  01/11/17   08/24/17    DW & Crew Mechanicals, Inc.         
                                                            HC-02          -1,825                  02/28/17   06/06/17    DW & Crew Mechanicals, Inc.         
                                                            P-04            2,021                  08/15/18   02/12/19    BROSH MECHANICAL, INC.              
                                                            P-06              637                  08/15/18   02/06/19    BROSH MECHANICAL, INC.              
                                                            P-07              368                  08/15/18   02/06/19    BROSH MECHANICAL, INC.              
 

          Bus Garage:
95-0275   Reconstruction               4-008-002  12/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0954   Reconstruction               4-008-004  07/11/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0203   Additions and Alterations    4-008-005  12/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-03           -2,330                  09/01/10   09/24/10    PAC & ASSOCIATES INC                
                                                            1-07            5,540                  09/01/10   09/24/10    PAC & ASSOCIATES INC                
                                                            1-10              973                  02/17/11   03/04/11    PAC & ASSOCIATES INC                
                                                            1-11            4,776                  03/18/11   09/21/11    PAC & ASSOCIATES INC                
                                                            3-01          -18,486                  02/17/11   03/04/11    HYDE STONE MECHANICAL CONTRACTORS   
                                                            4-04            9,549                  07/11/11   08/16/11    KNAPP ELECTRIC INC                  
                                                            6-01          -20,055                  03/14/11   06/20/11    DAVIS WALLBRIDGE INC                
                                                            6-05           -1,000                  09/27/10   11/05/10    DAVIS WALLBRIDGE INC                
                                                            6-06          -23,099                  11/09/10   11/12/10    DAVIS WALLBRIDGE INC                
                                                            AA 1-01        -3,451                  04/13/12     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            AA 5-01        -2,047                  04/13/12   08/30/12    RSI ROOFING INC                     
                                                            AA 5-01        -9,500                  04/13/12   08/30/12    RSI ROOFING INC                     
                                                            FO 1-04        -4,631                  04/13/12   08/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            FO 2-04             0                  04/13/12   09/07/12    KING & KING MECHANICAL INC          
                                                            FO 3-02             0                  04/13/12   09/07/12    HYDE STONE MECHANICAL CONTRACTORS   
                                                            FO 5-01          -570                  04/13/12   08/30/12    RSI ROOFING INC                     
                                                            FO 5-02        -7,416                  04/13/12   08/30/12    RSI ROOFING INC                     
                                                            FO 6-03          -975                  04/13/12   08/30/12    DAVIS WALLBRIDGE INC                
                                                            FO 6-04       -11,060                  04/13/12   08/30/12    DAVIS WALLBRIDGE                    
 
13-0123   Reconstruction               4-008-006  10/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            1,774                  04/24/14   05/08/14    Continental Construction, LLC       
                                                            1-02            8,562                  06/19/14   08/01/14    CONTINENTAL CONSTRUCTION,LLC.       
                                                            100-01              0                  05/28/15   06/18/15    Continental Construction LLC        
                                                            2-03              494                  01/13/15   01/20/15    Myraid Construction, Inc.           
                                                            201-01              0                  05/28/15   06/18/15    Myriad construction Inc.            
 
13-1626   Reconstruction               4-008-007  02/20/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00007             680                  11/10/16   11/28/16    Black Horse Group                   
                                                            GC-06               0                  08/15/18   02/22/19    BLACK HORSE GROUP                   
 
17-1585   Reconstruction               4-008-008  05/09/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2197   Reconstruction               4-008-009  02/21/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
15-0271   New Construction             7-016-001  02/18/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concessions Building:
16-1522   New Construction             7-017-001  10/03/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01             -489                  01/23/19   03/12/19    J.D. TAYLOR CONSTRUCTION, CORP.     
                                                            1-02            2,068                  01/23/19   03/12/19    J.D. TAYLOR CONSTRUCTION CORP.      
                                                            1-03            1,719                  01/23/19   03/12/19    J.D. TAYLOR CONSTRUCTION CORP.      
                                                            1-04            2,290                  01/23/19   03/12/19    J.D.TAYLOR CONSTRUCTION CORP.       
                                                            1-05            1,150                  01/23/19   03/12/19    J.D. TAYLOR CONSTRUCTION CORP.      
                                                            100-01              0                  01/23/19   03/12/19    J.D. TAYLOR CONSTRUCTION CORP.      
                                                            100-02              0                  01/23/19   03/12/19    J.D. TAYLOR CONSTRUCTION CORP.      
                                                            100-03              0                  01/23/19   03/12/19    J.D. TAYLOR CONSTRUCTION CORP.      
                                                            2-001         -10,000                  01/23/19   02/13/19    J&A MECHANICAL                      
                                                            3-001            -216                  01/23/19   02/13/19    LAWMAN HEATING && COOLING,INC.      
                                                            300-01              0                  01/23/19   02/13/19    LAWMAN HEATING & COOLING, INC.      
                                                            300-02              0                  01/23/19   02/13/19    LAWMAN HEATING & COOLING, INC.      
                                                            4-01             -400                  01/23/19   02/13/19    KNAPP ELECTRIC, INC.+               
                                                            4-02           -3,901                  01/23/19   02/13/19    KNAPP ELECTRIC, INC.                
                                                            400-01              0                  01/23/19   02/13/19    KNAPP ELECTRIC, INC.                
                                                            400-02              0                  01/23/19   02/13/19    KNAPP ELECTRIC, INC.                
                                                            400-03              0                  01/23/19   02/13/19    KNAPP ELECTRIC, INC.                
                                                            400-04              0                  01/23/19   02/13/19    KNAPP ELECTRIC, INC.                
 

          District-Wide:
98-0282   Reconstruction               7-999-001  11/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE

OSWEGO CITY SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-13-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Oswego Middle School:
91-0530   Reconstruction               0-001-008  01/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1274   Reconstruction               0-001-011  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0595   Reconstruction               0-001-012  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AL-C9-03        1,213                  04/27/04   05/12/04    Cory Wisinski Excavating            
                                                            C1-01          -4,035                  10/09/03   11/06/03    Davis Wallbridge                    
                                                            C12-01            838                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-01          4,620                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-02          5,434                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-03          1,507                  12/15/04   05/31/05    PAC Associates                      
                                                            C12-04            495                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-05          3,918                  05/26/05   05/31/05    PAC Associates                      
                                                            C12-06           -820                  05/26/05   05/31/05    PAC Associates of Oswego            
                                                            C12-07            797                  07/05/05   07/20/05    PAC Associates of Oswego            
                                                            C15-01         12,488                  12/15/04   05/31/05    Huen New york                       
                                                            C15-02            225                  12/15/04   05/31/05    Huen New York                       
                                                            C2-01             750                  12/08/03   12/29/03    Cory Wisinski Excavating            
                                                            C2-02           4,250           4,250  04/27/04   05/12/04    Cory Wisninki Excavating            
                                                            C8-01             220                  10/09/03   11/06/03    Cory Wisinski Excavating            
                                                            C8-02           4,780           4,780  04/27/04   05/12/04    Cory Wisinski Excavating            
                                                            C9-01           2,150                  10/09/03   11/06/03    Cory Wisinski Excavating            
                                                            C9-02           6,637           6,637  04/27/04   05/12/04    Cory Wisinski Excavating            
                                                            C9-03           8,787                  04/27/04     /  /      Cory Wisinski Excavating            
 
05-0169   Reconstruction               0-001-013  11/18/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0484   Additions and Alterations    0-001-014  05/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            107-52          5,569                  03/28/11   04/22/11    PATRICIA ELECTRIC INC               
                                                            2012-002            0                  07/02/10   07/23/10    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            2012-003            0                  07/14/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-004            0                  07/28/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-007            0                  07/28/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-009            0                  07/28/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-012            0                  07/30/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-016            0                  07/30/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-022            0                  08/26/10   09/13/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-024        1,800                  08/26/10   09/13/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-026            0                  09/13/10   09/28/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-027        7,032                  09/02/10   09/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-028            0                  11/04/10   11/10/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-030          393                  11/04/10   11/10/10    PAC & ASSOCIATES OF OSWEGO, INC     
                                                            2012-032        4,056                  09/02/10   09/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-042        1,288                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-058        6,233                  12/10/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-059        3,000                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-066            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-072       26,810                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-087       -7,032                  02/04/11   02/24/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-088       10,097                  02/04/11   02/24/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-093        7,726                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-095          270                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-096       11,842                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-097          978                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-099        1,205                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-109        1,123                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-115        5,197                  04/15/11   05/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-122        9,145                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-132        3,620                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-142       -1,200                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-143        1,644                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-149          665                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-155        7,229                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-161        3,065                  06/27/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-166        2,783                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-169          400                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-177       -5,410                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-184            0                  08/19/11   09/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-185        3,077                  08/19/11   09/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-197        5,682                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-198        4,749                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-206        9,346                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-290        7,107                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-305          464                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-312        2,415                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-313        1,404                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-315        2,041                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-338       -6,250                  05/11/12   01/24/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-353        1,649                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-356        2,523                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-359          296                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-364          859                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-365          269                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-384        2,583                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-002        4,485                  01/04/10   02/12/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-003        4,148                  01/04/10   02/12/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-004          720                  01/04/10   02/12/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-005        6,384                  01/04/10   02/12/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-006       16,260                  02/03/10   02/19/10    PAC & ASSOCAITES OF OSWEGO, INC.    
                                                            201A-007            0                  02/25/10   03/19/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-01         1,736                  10/05/09   10/26/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-010            0                  04/14/10   05/21/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-011      -53,046                  07/14/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            202A-001       -6,384                  01/04/10   02/12/10    DIAMOND ROOFING                     
                                                            202A-002            0                  01/04/10   02/12/10    DIAMOND ROOFING                     
                                                            202A-003          410                  02/25/10   03/19/10    DIAMOND ROOFING                     
                                                            202A-004       23,726                  04/07/10   06/16/10    DIAMOND ROOFING                     
                                                            202A-005          461                  11/22/10   11/30/10    DIAMOND ROOFING                     
                                                            202A-006          197                  12/24/10   02/09/11    DIAMOND ROOFING                     
                                                            205.2-18            0                  08/01/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            205.2-20            0                  09/20/11     /  /      SIRACUSA MECHANICAL INC             
                                                            2052-006            0                  11/29/10   12/22/10    SIRACUSA MECHANICAL INC             
                                                            2052-056       -2,616                  01/03/13   03/01/13    Siracusa Mechancial, inc.           
                                                            2052-057       -2,190                  01/03/13   03/01/13    Siracussa Mechanical, Inc.          
                                                            2052-11             0                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            2052-15             0                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            2062-001            0                  11/04/10   11/09/10    SIRACUSA MECHANICAL INC             
                                                            2062-002            0                  11/04/10     /  /      SIRACUSA MECHANICAL INC             
                                                            2062-003            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2062-004            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2062-006            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2062-007        7,061                  11/22/10     /  /      SIRACUSA MECHANICAL INC             
                                                            2062-008        6,432                  01/06/11   02/22/11    SIRACUSA MECHANICAL INC             
                                                            2062-009        5,696                  12/24/10   02/09/11    SIRACUSA MECHANICAL INC             
                                                            2062-014       15,952                  03/14/11   04/01/11    SIRACUSA MECHANICAL INC             
                                                            2062-031        1,780                  06/27/11   07/27/11    SIRACUSA MECHANICAL INC             
                                                            2062-052      -22,501                  12/05/12   02/27/13    SIRACUSA MECHANICAL INC             
                                                            2062-18         2,334                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            2062-19         1,558                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            2062-27           428                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            207.2-44          469                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-51        1,248                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-55        1,511                  09/15/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-69          594                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-85          524                  11/22/11   01/30/12    PATRICIA ELECTRIC INC               
                                                            207.2-90        1,235                  12/23/11   06/28/12    PATRICIA ELECTRIC INC               
                                                            207.2-96        9,373                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-001            0                  11/04/10   11/09/10    PATRICIA ELECTRIC INC               
                                                            2072-006            0                  11/04/10   11/09/10    PATRICIA ELECTRIC INC               
                                                            2072-009            0                  11/04/10   11/09/10    PATRICIA ELECTRIC INC               
                                                            2072-012      -11,218                  11/02/10   11/08/10    PATRICIA ELECTRIC INC               
                                                            2072-020            0                  11/02/10   11/08/10    PATRICIA ELECTRIC INC               
                                                            2072-021       -6,233                  12/24/10   02/09/11    PATRICIA ELECTRIC INC               
                                                            2072-023            0                  12/24/10   02/09/11    PATRICIA ELECTRIC INC               
                                                            2072-025       -4,326                  01/18/11   02/16/11    PATRICIA ELECTRIC INC               
                                                            2072-028            0                  02/04/11     /  /      PATRICIA ELECTRIC INC               
                                                            2072-029            0                  02/04/11   02/24/11    PATRICIA ELECTRIC INC               
                                                            2072-030            0                  02/04/11   02/24/11    PATRICIA ELECTRIC INC               
                                                            2072-031            0                  03/14/11   04/01/11    PATRICIA ELECTRIC INC               
                                                            2072-037        1,816                  04/20/11   05/13/11    PATRICIA ELECTRIC INC               
                                                            2072-039            0                  04/15/11   05/10/11    PATRICIA ELECTRIC INC               
                                                            2072-104        7,646                  01/20/12     /  /      PATRICIA ELECTRIC INC               
                                                            2072-110        1,073                  03/16/12   08/06/12    PATRICIA ELECTRIC INC               
                                                            2072-43        11,032                  07/18/11   12/13/11    PATRICIA ELECTRIC INC               
 
12-0476   Reconstruction               0-001-015  07/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E2-007        -21,023                  02/22/16   03/14/16    MEC Electric, Inc.                  
                                                            G2-003            457                  09/26/14   10/08/14    PAC & Associates of Oswego, Inc.    
                                                            G4-001          2,415                  09/02/15   09/15/15    WD Malone Trucking & Excavating Inc.
                                                            P2-007          6,984                  01/11/16   04/21/16    Oswego Mechanical, Inc.             
                                                            P2-008         16,021                  01/11/16   04/21/16    Oswego Mechanical, Inc.             
                                                            P3-001          1,379                  06/06/14   07/07/14    J & A Mechanical Contractors, Inc.  
                                                            P3-002          5,183                  08/21/14   09/09/14    J & A Mechanical Contractors, Inc.  
 
22-1133   Reconstruction               0-001-016  01/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1729   Reconstruction               0-001-017  05/03/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  12/20/19   01/10/20    PATRICIA ELECTRIC, INC.             
                                                            GC-01               0                  12/20/19   01/27/20    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            GC-02               0                  12/20/19   01/27/20    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            GC-03               0                  12/20/19   01/27/20    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            MC-01               0                  12/20/19   01/10/20    J&A MECHANICAL CONTRACTORS, INC.    
 
19-0951   Reconstruction               0-001-018  04/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-020             0                  11/08/21   12/12/22    Rombough Electric, Inc              
                                                            EC2-023             0                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-039           803                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-047         5,988                  12/03/21   09/20/22    Rombough Elec, Inc                  
                                                            EC2-048           242                  12/03/21   09/20/22    Rombough Elec, Inc                  
                                                            GC2-042         1,598                  01/18/22   11/01/22    MCK Bldg Assocs Inc                 
                                                            GC2-049           613                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-050         1,442                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-053           572                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-058         1,148                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-059        12,380                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            MC2-003             0                  09/04/20   11/05/20    NAIRY MECHANICAL, LLC               
                                                            MC2-020         6,605                  12/03/21   09/20/22    Nairy Mech LLC                      
                                                            MC2-022         7,074                  01/18/22   01/27/23    Nairy Mech LLC                      
                                                            MC2-023       -11,454                  01/18/22   01/27/23    Nairy Mech LLC                      
                                                            MC2-024        -3,949                  01/27/22   01/25/23    Nairy Mech LLC                      
 
02-0579FP Reconstruction               0-001-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fitzhugh Park Elementary School:
92-0914   Reconstruction               0-002-005  04/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1376   Reconstruction               0-002-006  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0841   Reconstruction               0-002-008  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1275   Reconstruction               0-002-009  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0596   Reconstruction               0-002-010  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            C10-01          4,966           4,966  05/26/05   05/31/05    EZ Paving Sealcoat                  
                                                            C12-01          5,300                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-02        -11,510                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-03            660                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-04          4,363                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-05          1,083                  12/15/04   05/31/05    PAC Associates                      
                                                            C12-06            944                  07/05/05   07/20/05    PAC Associates of Oswego            
                                                            C12-07          1,755                  07/05/05   07/20/05    PAC Associates                      
                                                            C13-01          1,526                  07/05/05   07/20/05    Oswego mechanical Inc               
                                                            C13-02            -39                  05/26/05   06/03/05    Oswego Mechanical Inc               
                                                            C13-03            927                  05/26/05   05/31/05    Oswego Mech.                        
                                                            C16-01            567                  12/15/04   12/28/04    J&A Mech.                           
 
04-0403   Reconstruction               0-002-011  12/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0485   Reconstruction               0-002-012  05/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2012-001            0                  05/28/10   07/21/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-005            0                  07/28/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-010            0                  07/28/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-023            0                  08/26/10   09/13/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-035            0                  09/15/10   09/29/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-038            0                  11/04/10   11/10/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-043            0                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-044          832                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-045       12,733                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-046          759                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-047       16,683                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-048       56,365                  11/22/10   11/30/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-049       11,320                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-050            0                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-053            0                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-054            0                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-055            0                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-056            0                  12/10/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-057            0                  12/10/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-065            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-068            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-069            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-070       14,403                  12/10/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-073            0                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-074       13,721                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-075       14,712                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-076        2,644                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-077          361                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-081       17,535                  01/06/11   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-082        4,047                  01/06/11   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-083        2,868                  01/06/11   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-084       16,216                  01/06/11   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-086        5,492                  02/04/11   02/24/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-089          290                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-091        1,519                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-092          594                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-098        1,222                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-100          765                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-101        2,399                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-102          433                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-106            0                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-112          706                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-114          524                  04/15/11   05/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-120       12,751                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-123        8,820                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-126        6,315                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-127        6,126                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO, INC     
                                                            2012-129        4,658                  07/14/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-130        4,620                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-134        2,910                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-135        2,509                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-136        1,519                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-137          438                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-138          237                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-141       -1,200                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-144          802                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-146          257                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-167        9,874                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-168       15,135                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-186       12,847                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-188        5,269                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-214        5,136                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-216        7,510                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-220        2,566                  09/20/11   01/17/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-230       15,349                  09/20/11   01/17/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-231          587                  10/18/11   01/17/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-237        1,968                  10/18/11   01/17/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-240          985                  10/18/11   01/17/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-243        3,519                  10/18/11   01/17/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-244        1,816                  10/18/11     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-258        1,790                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-265         -278                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-283        1,244                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-299        2,483                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-324          605                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-333        4,027                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-334         -823                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-335         -513                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-343       -2,519                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-348          402                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-352        3,257                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-362       -2,797                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-370          573                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-373          489                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-382         -237                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-386      -15,160                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-008       11,827                  02/25/10   03/19/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            201A-009            0                  04/07/10   06/16/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            205.2-10            0                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            205.2-21            0                  09/20/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            205.2-29       11,327                  11/14/11   01/25/12    SIRACUSA MECHANICAL INC             
                                                            205.2-9        -2,880                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            205.2043       -2,630                  06/29/12   11/16/12    Siracuse Mechanical, Inc.           
                                                            205.2050        2,035                  06/29/12   10/18/13    Siracusa Mechanical, Inc.           
                                                            2052-002            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2052-003            0                  11/22/10   11/30/10    SIRACUSA MECHANICAL INC             
                                                            2052-005            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2052-007            0                  11/22/10   11/30/10    SIRACUSA MECHANICAL INC             
                                                            2052-12             0                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            2052-13             0                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            2052-14             0                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            2052-17             0                  07/18/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            206.2-15       -2,880                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            206.2-17        4,800                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            206.2-20        1,311                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            206.2-21        2,047                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            206.2-22          822                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            206.2-23        2,323                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            206.2-39          931                  03/05/12   07/25/12    SIRACUSA MECHANICAL INC             
                                                            206.2-40        1,345                  03/05/12   07/25/12    SIRACUSA MECHANICAL INC             
                                                            206.2-41          759                  03/16/12   08/06/12    SIRACUSA MECHANICAL INC             
                                                            2062-005            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2062-24         1,247                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            207.2-33            0                  03/14/11   04/01/11    PATRICIA ELECTRIC INC               
                                                            207.2-35            0                  03/28/11   04/22/11    PATRICIA ELECTRIC INC               
                                                            207.2-45        1,897                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-48       13,642                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-56        2,237                  09/15/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-61        5,017                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-67        7,193                  10/06/11     /  /      PATRICIA ELECTRIC INC               
                                                            207.2-70        1,726                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-89          519                  12/23/11   06/28/12    PATRICIA ELECTRIC INC               
                                                            2072-007            0                  11/04/10   11/10/10    PATRICIA ELECTRIC INC               
                                                            2072-015            0                  11/02/10   11/08/10    PATRICIA ELECTRIC INC               
                                                            2072-017            0                  11/22/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            2072-018            0                  11/02/10   11/08/10    PATRICIA ELECTRIC INC               
                                                            2072-022            0                  12/24/10   02/09/11    PATRICIA ELECTRIC INC               
                                                            2072-026            0                  01/18/11   02/16/11    PATRICIA ELECTRIC INC               
                                                            2072-036            0                  04/20/11   05/13/11    PATRICIA ELECTRIC INC               
                                                            2072-105        1,974                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-109          729                  03/16/12   08/06/12    PATRICIA ELECTRIC INC               
                                                            2072-38         8,381                  04/15/11   05/10/11    PATRICIA ELECTRIC INC               
                                                            2072-40        -1,440                  06/06/11   07/14/11    PATRICIA ELECTRIC INC               
 
11-0950   Reconstruction               0-002-013  06/06/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            302-001        -2,702                  01/28/14   03/05/14    Diamond Roofing                     
 
19-0952   Reconstruction               0-002-014  04/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-034         1,195                  12/03/21   09/20/22    Rombough Elec Inc                   
 
20-1569   Reconstruction               0-002-015  02/18/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  12/05/22     /  /      Knapp Elec Inc                      
                                                            EC-02               0                  12/05/22   05/23/23    Knapp Elec Inc                      
                                                            GC-03               0                  07/25/22   05/22/23    Paul Castaldo Inc                   
                                                            GC-06          26,523                  07/25/22   05/22/23    Paul Castaldo Inc                   
                                                            GC-07          -4,207                  08/22/22   12/13/23    Paul Castaldo Inc                   
                                                            GC-10               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-12               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-17          17,346                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-20               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-24           7,761                  01/23/23   12/15/23    PAUL A CASTALDO INC                 
                                                            GC-25          30,236                  01/23/23   12/15/23    PAUL A CASTALDO                     
                                                            GC-26          12,255                  01/23/23   12/15/23    PAUL A CASTALDO INC                 
                                                            GC-27               0                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            GC-28               0                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            GC-33          10,260                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            MC-01            -503                  10/31/22   11/15/23    King And King Mech Inc              
                                                            MC-02          -3,645                  10/31/22   11/15/23    King and King Mech Inc              
                                                            MC-03          -6,634                  10/31/22   11/15/23    King and King Mech Inc              
                                                            MC-07          12,721                  12/05/22   05/23/23    King&King Mech Inc                  
                                                            MRC-01              0                  07/25/22   05/09/23    R.E. Kelley                         
                                                            PC-07          -1,498                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-08            -721                  08/29/22   04/20/23    Oswego Mech Inc                     
 

          Kingsford Park Elementary School:
91-1075   Reconstruction               0-003-006  04/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0915   Reconstruction               0-003-007  04/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0840   Reconstruction               0-003-009  02/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1276   Reconstruction               0-003-010  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0597   Reconstruction               0-003-011  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C12-01          3,568                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-02         -6,950                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-03           -639                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-04          1,083                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-05          1,365                  07/05/05   07/20/05    PAC Associates                      
                                                            C13-01            998                  12/15/04   07/07/05    Oswego Mech.                        
                                                            C16-01            566                  05/26/05   05/31/05    J and A Mechanical Contractors      
 
04-0404   Reconstruction               0-003-012  12/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0486   Reconstruction               0-003-014  05/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2012-013            0                  07/30/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-019            0                  07/30/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-064            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-116       29,904                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-117       21,977                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-118       20,270                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-127        6,126                  06/06/11     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-152        1,664                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-153        2,812                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-156        2,208                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-157        6,345                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-158        1,870                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-160        2,931                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-162       14,211                  06/27/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-163        5,446                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-170       11,472                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-172          144                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-173          362                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-175        6,248                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-182          443                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-183        1,691                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO, INC     
                                                            2012-190        1,162                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-192          519                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-193           57                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-194        2,945                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-195          292                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-201        5,382                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-202        4,111                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-204        4,078                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-205          457                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-208          121                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-209        4,725                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-213        2,377                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-218       11,274                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-221       14,864                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-222        4,287                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-224          210                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-226        2,397                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-232        8,754                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-233          964                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-234        1,140                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-236        1,400                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-238          898                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-241        1,068                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-242        1,298                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-251        1,605                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-252          410                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-253        1,377                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-256        4,122                  11/01/11   01/24/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-259        5,373                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-268        6,363                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-269       10,443                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-272       13,894                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-275          938                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-276        2,794                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-277          492                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-278        5,995                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-279          329                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-281        1,800                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-284          728                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-288          997                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-291        1,294                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-297       -3,700                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-306          187                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-308        1,183                  12/23/11   06/29/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-311          908                  01/20/12   04/06/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-317        6,017                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-318        3,431                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-322       12,733                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-336        5,692                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-339          680                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-341          540                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-354        3,358                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-358          374                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-363          799                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-366        1,199                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-367          336                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-369        1,149                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-374        2,156                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-375      -17,000                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-380        1,342                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-381          303                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-388        1,424                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-389          500                  12/12/12   03/14/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            205.2-19            0                  08/01/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            205.2-22            0                  09/20/11     /  /      SIRACUSA MECHANICAL INC             
                                                            205.2-24            0                  09/20/11   12/13/11    SIRACUSA MECHNAICAL INC             
                                                            205.2-25            0                  09/20/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            205.2-26            0                  09/20/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            205.2-27          663                  10/06/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            205.2-30        3,337                  12/23/11   06/28/12    SIRACUSA MECHANICAL INC             
                                                            205.2-32       17,051                  12/27/11   02/21/12    Siracusa Mechanical, Inc.           
                                                            205.2-34        4,232                  03/05/12   07/25/12    SIRACUSA MECHANICAL INC             
                                                            205.2041        2,904                  06/29/12   11/16/12    Siracuse Mechanical, Inc.           
                                                            205.2042        2,630                  06/29/12   11/16/12    Siracuse Mechanical, Inc.           
                                                            205.2046        3,064                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            205.2047        9,407                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            205.2048       10,483                  06/29/12   11/16/12    Siracuse Mechanical, Inc.           
                                                            205.2049       10,052                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            2052-054        3,828                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            206.2-33        3,328                  08/05/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            206.2-34        5,704                  12/23/11   08/08/12    SIRACUSA MECHANICAL INC             
                                                            206.2-37        4,416                  01/20/12   04/04/12    SIRACUSA MECHANICAL INC             
                                                            206.2-38       14,536                  01/20/12   04/04/12    SIRACUSA MECHANICAL INC             
                                                            206.2042        3,214                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            206.2043        9,750                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            206.2044       10,200                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            206.2045        4,348                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            206.2046          828                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            206.2047      -19,820                  06/29/12   11/16/12    Siracusa Mechanical, Inc.           
                                                            2062-048       -1,380                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            2062-049         -374                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            2062-050         -144                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            2062-28           748                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            2062-29         1,780                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            207.2-49        5,756                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-57        1,111                  09/15/11     /  /      PATRICIA ELECTRIC INC               
                                                            207.2-62        5,745                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-63          210                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-68        7,193                  10/06/11     /  /      PATRICIA ELECTRIC INC               
                                                            207.2-71          349                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-73        5,831                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-74        1,214                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-76        3,665                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-91          951                  12/23/11   06/28/12    PATRICIA ELECTRIC INC               
                                                            207.2-92        2,350                  12/23/11   06/28/12    PATRICIA ELECTRIC INC               
                                                            2072-101        1,578                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-102          398                  01/26/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-113        6,466                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-121      -40,000                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
 
19-0953   Reconstruction               0-003-015  04/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-005             0                  09/24/20   11/09/20    ROMBOUGH ELECTRIC, INC.             
                                                            RC2-001       -50,000                  08/26/21   05/06/22    DIAMOND ROOFING COMPANY, INC        
 
20-1570   Reconstruction               0-003-016  02/18/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-18          10,658                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-36          12,254                  09/18/23   12/18/23    PAUL A CATALDO INC                  
                                                            GC3-030             0                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            MC-06          13,847                  12/05/22   05/23/23    King&King Mech Inc                  
                                                            PC-08            -360                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-16               0                  01/18/23   06/06/23    OSWEGO MECH INC                     
 

          Riley Elementary School:
91-0492   Reconstruction               0-004-009  01/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1377   Reconstruction               0-004-010  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1378   Reconstruction               0-004-011  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0764   Reconstruction               0-004-013  03/12/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            12,996                  05/20/02   06/04/02    Ajay Glass and Mirror               
                                                            2012-014            0                  07/30/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
 
01-1277   Reconstruction               0-004-014  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0598   Reconstruction               0-004-015  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C11-01          6,725                  08/17/04   09/16/04    Summit Environmental                
                                                            C11-01         10,990                  08/17/04   09/16/04    Summit Environmental                
                                                            C12-01            851                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-01          3,310                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-02            982                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-03          1,730                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-04          8,573                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-05          5,151                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-06          8,932                  05/26/05   05/31/05    PAC Associates                      
                                                            C12-07          3,326                  05/26/05   05/31/05    PAC Associates                      
                                                            C15-01          1,542                  08/17/04   09/16/04    Huen New York                       
 
08-0487   Reconstruction               0-004-016  05/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2012-017            0                  07/30/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-034            0                  09/02/10   09/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-037        1,388                  09/02/10   09/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-061       16,229                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-067            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-090        8,298                  02/04/11   02/24/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-105          920                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-113        6,025                  04/15/11   05/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-124        8,401                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-128        4,799                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-131        3,786                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-133        3,560                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-140          804                  06/27/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-171          508                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-196          514                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-199       19,824                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-210       31,707                  01/18/12     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-215        5,192                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-219        5,817                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-223        7,513                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-235        2,609                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-246        4,723                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-247        1,935                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-257       23,232                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-270        3,626                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-296        2,483                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-298        2,563                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-301          593                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-304       17,558                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-307          831                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-321        2,275                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-323       -1,748                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-325       12,919                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-326        3,135                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-327        2,328                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-328        3,973                  03/13/12   09/28/12    PAC & ASSOCIATES OF OSWEGO, INC     
                                                            2012-330          548                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-331        9,517                  03/16/12     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-332          159                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-340          226                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-346       -4,894                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-350        2,389                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-357        6,070                  06/29/12   11/28/12    PAC & Associates Of Oswego, Inc.    
                                                            2012-368        3,690                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-376        1,465                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-377        1,001                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            205.2-31        3,525                  12/23/11   08/08/12    SIRACUSA MECHANICAL INC             
                                                            205.2040       13,851                  06/29/12   11/16/12    Siracuse Mechanical, Inc.           
                                                            2052-052        8,464                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            2052-16             0                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            206.2-12       18,622                  03/14/11   04/01/11    SIRACUSA MECHANICAL INC             
                                                            206.2-13       10,407                  03/14/11   04/01/11    SIRACUSA MECHANICAL INC             
                                                            2062-26         1,780                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            2062-32           828                  07/18/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            207.2-32            0                  03/14/11   04/01/11    PATRICIA ELECTRIC INC               
                                                            207.2-46          854                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-46          854                  08/19/11   12/14/11    PATRICIA ELECTRIC INC               
                                                            207.2-47          556                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-53        1,516                  08/19/11   12/14/11    PATRICIA ELECTRIC INC               
                                                            207.2-65       10,490                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-83        6,600                  11/22/11   01/30/12    PATRICIA ELECTRIC INC               
                                                            207.2-84          442                  11/22/11   01/30/12    PATRICIA ELECTRIC INC               
                                                            207.2-93        2,426                  12/23/11   06/28/12    PATRICIA ELECTRIC INC               
                                                            207.2-94        1,106                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            207.2-95        7,103                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-008            0                  11/04/10   11/10/10    PATRICIA ELECTRIC INC               
                                                            2072-010            0                  11/02/10   11/08/10    PATRICIA ELECTRIC INC               
                                                            2072-014            0                  11/29/10   12/22/10    PATRICIA ELECTRIC INC               
                                                            2072-019            0                  11/02/10   11/08/10    PATRICIA ELECTRIC INC               
                                                            2072-027            0                  01/18/11   02/16/11    PATRICIA ELECTRIC INC               
                                                            2072-103          428                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-106        4,942                  03/16/12   08/06/12    PATRICIA ELECTRIC INC               
                                                            2072-107        1,508                  03/16/12   08/06/12    PATRICIA ELECTRIC INC               
                                                            2072-108        4,080                  03/16/12   08/06/12    PATRICIA ELECTRIC INC               
                                                            2072-112      -20,000                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-117        2,716                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-118        1,529                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-119          565                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-41           264                  06/06/11   07/14/11    PATRICIA ELECTRIC INC               
                                                            3012-104       19,984                  04/04/11   04/29/11    PAC & ASSOCIATES OF OSWEGO INC      
 
12-0477   Reconstruction               0-004-017  07/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E2-004          3,228                  12/15/14   01/07/15    MEC Electric, Inc.                  
                                                            E2-08           6,590                  01/11/16   04/12/16    MEC Electric, Inc.                  
                                                            E2-11           1,226                  01/11/16   04/21/16    MEC Electric, Inc.                  
                                                            G2-006         47,279                  09/26/14   10/08/14    PAC & Associates of Oswego, Inc.    
                                                            G2-009          2,996                  11/06/14   12/01/14    PAC & Associates of Oswego, Inc.    
                                                            G2-014         -3,561                  01/30/15   02/03/15    PAC & Assocaites of Oswego, Inc.    
                                                            G2-020            946                  10/30/15   11/30/15    PAC & Associates of Oswego, Inc.    
                                                            G2-021          9,679                  02/22/16   03/14/16    PAC & Associates of Oswego, Inc.    
                                                            H2-006         13,045                  10/22/15   01/21/16    J&A Mechanical Contractors, Inc.    
                                                            H2-007          2,117                  01/11/16   04/12/16    J&A Mechanical Contractors, Inc.    
                                                            H2-008          1,120                  02/22/16   03/14/16    J&A Mechanical Contractors, Inc.    
                                                            P2-006          3,495                  10/22/15   01/21/16    Oswego Mechanical, Inc.             
                                                            R2-003           -419                  01/20/15   01/26/15    Diamond Roofing                     
                                                            R2-007          1,011                  09/02/15   09/15/15    Diamond Roofing Co. Inc.            
                                                            R2-013           -218                  02/22/16   03/14/16    Diamond Roofing Co., Inc.           
                                                            R2-11          -1,226                  02/22/16   03/14/16    Diamond Roofing Co., Inc.           
 
20-1571   Reconstruction               0-004-018  02/18/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  12/05/22   05/23/23    Knapp Elec Inc                      
                                                            EC-03               0                  01/23/23   11/17/23    KNAPP ELEC INC                      
                                                            EC-04               0                  01/23/23   05/23/23    KNAPP ELEC INC                      
                                                            EC-05               0                  03/06/23   12/13/23    KNAPP ELEC INC                      
                                                            EC-06               0                  03/06/23   12/13/23    KNAPP ELEC INC                      
                                                            GC-01          -3,088                  07/25/22   05/22/23    Paul Castaldo Inc                   
                                                            GC-05          14,037                  07/25/22   05/22/23    Paul Castaldo Inc                   
                                                            GC-08          42,660                  01/18/23     /  /      PAUL A CASTALDO INC                 
                                                            GC-09          19,535                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-11               0                  01/18/23   12/14/23    PAUL A CASTALDO                     
                                                            GC-13           8,287                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-14               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-15               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-16               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-22          20,647                  01/18/23   06/06/23    PAUL A CASTALDO INC                 
                                                            GC-23               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-29               0                  04/17/23   01/02/24    PAUL . CASTALDO                     
                                                            MC-04          -3,048                  10/31/22   11/15/23    King and King Mech Inc              
                                                            MC-05               0                  12/05/22   05/23/23    King&King Mech Inc                  
                                                            MC-08               0                  01/23/23   12/14/23    KING & KING MECH INC                
                                                            PC-01          -2,674                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-02               0                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-03         -12,723                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-04               0                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-05          -4,557                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-06          -2,516                  08/29/22   04/20/23    Oswego Mech Inc                     
                                                            PC-09          -5,406                  10/31/22     /  /      Oswego Mech Inc                     
                                                            PC-10               0                  10/31/22   11/15/23    Oswego Mech Inc                     
                                                            PC-11          31,149                  12/05/22   05/23/23    Oswego Mech Inc                     
                                                            PC-12          28,898                  12/05/22   05/23/23    Oswego Mech Inc                     
                                                            PC-13          26,327                  12/05/22   05/23/23    Oswego Mech Inc                     
                                                            PC-14          13,775                  12/05/22   05/23/23    Oswego Mech Inc                     
                                                            PC-18          30,234                  01/18/23   06/06/23    OSWEGO MECHANICAL INC               
                                                            PC-21           8,180                  04/17/23   12/27/23    OSWEGO MECHANICAL                   
 
02-0578FP Reconstruction               0-004-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Frederick Leighton Elementary School:
91-0493   Reconstruction               0-005-008  01/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0426   Reconstruction               0-005-009  12/04/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1379   Reconstruction               0-005-010  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1278   Reconstruction               0-005-013  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0599   Reconstruction               0-005-014  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADC13-02        1,909                  07/05/05   07/20/05    Oswego mechanical                   
                                                            ADC14-01         -351                  12/15/04   12/28/04    HMI Mech.                           
                                                            ALC4-01         3,320                  12/08/03   12/29/03    MARS Inc                            
                                                            ALC5-02         1,837                  12/08/03   12/29/03    Western NY Flooring                 
                                                            ALC5-03           500                  12/08/03   12/29/03    Western NY Flooring                 
                                                            ALC5-04           687                  03/19/04   03/30/04    Western NY Flooring                 
                                                            C1-01           8,791                  08/17/04   09/16/04    Davis Wallbridge                    
                                                            C1-01           4,477                  08/17/04   09/16/04    Davis Wallbridge                    
                                                            C1-02             523                  08/17/04   09/16/04    Davis Wallbridge                    
                                                            C11-01         24,800                  08/17/04   09/16/04    Summit Environ.                     
                                                            C11-01          5,000                  08/17/04   09/16/04    Summit Environ.                     
                                                            C12-01         -1,572                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-01            799                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-02           -251                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-03          2,420                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-04            800                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-05            117                  05/26/05   05/31/05    PAC Associates                      
                                                            C12-06           -780                  05/26/05   05/31/05    PAC Associates                      
                                                            C13-01          2,124                  08/17/04   09/16/04    Oswego Mech.                        
                                                            C14-01         -4,649                  05/26/05   06/03/05    HMI Mechanical Systems              
                                                            C15-01          1,226                  12/15/04   12/28/04    Huen New York                       
                                                            C15-02            380                  12/15/04   12/28/04    Huen New York                       
                                                            C15-03          1,205                  12/15/04   12/28/04    Huen New York                       
                                                            C15-04            410                  12/15/04   12/28/04    Huen New York                       
                                                            C3-01           5,646                  10/09/03   11/06/03    Deluxe Roofing                      
                                                            C3-01          -1,993                  10/09/03   11/06/03    Deluxe Roofing                      
                                                            C3-02          -4,354                  05/26/05   06/03/05    Deluxe Roofing Sheet Metal          
                                                            C4-01            -180                  05/26/05   06/03/05    MARS Inc                            
                                                            C5-01           7,000                  08/08/03   09/05/03    Western NY Flooring                 
                                                            C5-01           1,783                  10/09/03   11/06/03    Western NY Flooring                 
                                                            C5-02           2,283           2,283  10/09/03   11/06/03    Western NY Flooring                 
                                                            C5-02           2,283                  08/17/04   09/16/04    Western NY Flooring                 
                                                            C5-03           3,575           3,575  12/08/03   12/29/03    Western NY Flooring                 
                                                            C5-04            -192                  05/26/05   06/03/05    The Western New York Floor Co       
 
08-0488   Reconstruction               0-005-015  05/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2012-063            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-078          545                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-080        3,307                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-110       11,226                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-111        1,013                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-119       13,901                  06/06/11   07/15/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-121       11,242                  06/06/11   07/15/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-139          804                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-148        1,008                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-150        4,957                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-151       12,348                  06/06/11   07/14/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-164        1,027                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-165        8,908                  07/01/11   07/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-174         -498                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-176      -39,188                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-178        1,350                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-180        6,734                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-189        2,946                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-191        1,547                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-200        5,174                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-212            0                  09/15/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-217        1,907                  09/20/11     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-227       19,831                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-228        2,184                  09/20/11   01/24/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-229        4,261                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-239       10,817                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-245        1,372                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-248        4,084                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-249        5,239                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-255        2,390                  11/01/11   01/24/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-266       10,144                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-267        3,400                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-271        5,144                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-273          815                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-274          462                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-282        9,342                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-286        1,732                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-287        3,465                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-293        1,222                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-294        4,426                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-295        8,109                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-302        5,221                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-310        2,426                  01/20/12   04/06/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-319       18,003                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-320        2,275                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-329        1,640                  09/28/12     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-344      -12,503                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-347       -7,000                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-349       -3,695                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-360        3,270                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-361          848                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-371        4,807                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-372        2,257                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-378          187                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-379        1,366                  09/26/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-387        4,204                  09/13/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-390          500                  12/12/12   03/14/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            205.2-23            0                  09/20/11   12/13/11    SIRACUSA MECHANICAL INC             
                                                            205.2-28            0                  11/14/11   01/25/12    SIRACUSA MECHANICAL INC             
                                                            205.2-35        4,410                  03/05/12   07/25/12    SIRACUSA MECHANICAL INC             
                                                            205.2-36            0                  03/05/12   07/25/12    SIRACUSA MECHANICAL INC             
                                                            205.2-37            0                  03/16/12   08/06/12    SIRACUSA MECHANICAL INC             
                                                            205.2038        3,220                  06/29/12   11/16/12    Suracuse Mechanical, Inc.           
                                                            205.2044      -35,105                  06/29/12   11/16/12    Siracuse Mechanical, Inc.           
                                                            206.2-10        3,565                  02/25/11   03/18/11    SIRACUSA MECHANICAL INC             
                                                            206.2-16        5,060                  04/08/11   05/05/11    SIRACUSA MECHANICAL INC             
                                                            206.2-36        3,858                  01/20/12   04/04/12    SIRACUSA MECHANICAL INC             
                                                            2062-30         1,780                  06/06/11   07/14/11    SIRACUSA MECHANICAL INC             
                                                            207.2-50        8,414                  08/01/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-52        5,876                  09/06/11   12/14/11    PATRICIA ELECTRIC INC               
                                                            207.2-59        1,042                  09/15/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-66        1,011                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-72        1,181                  11/01/11   12/29/11    PATRICIA ELECTRIC INC               
                                                            207.2-75        2,197                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-78        4,392                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-79        2,616                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-80        5,030                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-82        1,163                  11/14/11   01/25/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            207.2-86        2,910                  11/22/11   01/30/12    PATRICIA ELECTRIC INC               
                                                            207.2-87          489                  12/23/11   06/28/12    PATRICIA ELECTRIC INC               
                                                            207.2-97        7,040                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            207.2-98        1,067                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-111      -25,000                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-120          682                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-42           292                  06/06/11   07/15/11    PATRICIA ELECTRIC INC               
 
11-1215   Reconstruction               0-005-016  10/03/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0478   Reconstruction               0-005-017  07/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E2-001          7,317                  11/06/14   11/21/14    MEC Electric, Inc.                  
                                                            E2-002          6,133                  11/06/14   12/01/14    MEC Electric, Inc.                  
                                                            E2-005          1,074                  12/15/14   01/07/15    MEC Electric, Inc.                  
                                                            E2-012          1,580                  02/22/16   03/14/16    MEC Electric, Inc.                  
                                                            G2-002          5,525                  09/26/14   10/08/14    PAC & Associates of Oswego, Inc.    
                                                            G2-005         42,322                  09/26/14   10/08/14    PAC & Associates of Oswego, Inc.    
                                                            G2-007         13,437                  11/06/14   12/01/14    PAC & Associates of Oswego, Inc.    
                                                            G2-011          2,504                  12/15/14   01/07/15    PAC & Associates of Oswego, Inc.    
                                                            G2-013            797                  01/20/15   01/26/15    PAC & Associates Of Oswego, Inc.    
                                                            G2-015          1,699                  07/15/15   08/11/15    PAC & Associates Of Oswego Inc.     
                                                            G2-018            534                  07/15/15   08/11/15    PAC & Associates Of Oswego Inc.     
                                                            H2-002          2,933                  11/06/14   12/01/14    J & A Mechnicals Contractors, Inc.  
                                                            H2-004          3,563                  09/02/15   09/15/15    J&A Mechanical Contractors Inc.     
                                                            H2-009          1,537                  02/22/16   03/14/16    J&A Mechanical Contractors, Inc.    
                                                            P2-001          5,858                  11/06/14   12/01/14    Oswego Mechanical, Inc.             
                                                            P2-003          3,809                  12/15/14   01/07/15    Oswego Mechanical, Inc.             
                                                            P2-005         33,900                  09/02/15   09/15/15    Oswego Mechanical Inc.              
                                                            R2-002          5,155                  11/06/14   12/01/14    Diamond Roofing                     
                                                            R2-002          8,368                  11/06/14   12/01/14    Diamond Roofing                     
                                                            R2-006          1,920                  09/02/15   09/15/15    Diamond Roofing Co. Inc.            
                                                            R2-012            685                  02/22/16   03/14/16    Diamond Roofing Co., Inc.           
 
16-1541   Reconstruction               0-005-018  05/22/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  08/22/18   09/14/18    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-02         -12,098                  08/23/18   09/12/18    PAC ASSOCIATES OF OSWEGO INC        
 
19-0954   Reconstruction               0-005-019  04/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2-046        2,574                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-001             0                  09/24/20   11/09/20    ROMBOUGH ELECTRIC, INC.             
                                                            EC2-003         8,322                  09/24/20   11/09/20    ROMBOUGH ELECTRIC, INC.             
                                                            EC2-008        21,100                  07/26/21   04/05/22    ROMBOUGH ELECTRTIC, INC             
                                                            EC2-009             0                  07/26/21   04/05/22    ROMBOUGH ELECTRTIC INC              
                                                            EC2-012         1,365                  07/26/21   04/05/22    ROMBOUGH ELECTRTIC INC              
                                                            EC2-013             0                  07/26/21   04/05/22    ROMBOUGH ELECTRTIC, INC             
                                                            EC2-014             0                  07/26/21   04/05/22    ROMBOUGH ELECTRTIC, INC             
                                                            EC2-015             0                  07/26/21   04/05/22    ROMBOUGH ELECTRTIC, INC             
                                                            EC2-016             0                  07/26/21   04/05/22    ROMBOUGH ELECTRTIC, INC             
                                                            EC2-021        12,227                  11/08/21   12/12/22    Rombough Electric, Inc              
                                                            EC2-033         4,830                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-035         5,367                  12/03/21   09/20/22    Rombough Elec inc                   
                                                            EC2-037         1,893                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-038         2,220                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-044           104                  12/03/21   09/20/22    Rombough Electric Inc               
                                                            GC2-001             0                  06/16/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-003             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-004             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-005             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-006             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-007             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-008             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-009             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-010             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-011             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-013        24,798                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-015             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-017        22,132                  10/08/20   12/09/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-019             0                  09/24/20   11/25/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-020         2,904                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-021         1,554                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-022        36,377                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-023        19,393                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-026         3,557                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-028             0                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-030         8,044                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-032         3,005                  06/20/23   12/18/23    mck building associates             
                                                            GC2-033         2,188                  06/20/23     /  /      MCK BUILDING ASSOCIATES             
                                                            GC2-038         1,916                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-039           805                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-041           938                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-046         5,313                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            MC2-001             0                  09/04/20   11/05/20    NAIRY MECHANICAL, LLC               
                                                            MC2-002             0                  09/04/20   11/05/20    NAIRY MECHANICAL, LLC               
                                                            MC2-004             0                  09/04/20   11/05/20    NAIRY MECHANICAL, LLC               
                                                            MC2-010        34,730                  11/02/21   12/13/22    Nairy Mechanical, LLC               
                                                            MC2-014             0                  11/02/21   12/13/22    Nairy Mech, LLC                     
                                                            MC2-017             0                  11/02/21   12/13/22    Nairy Mech, LLC                     
                                                            PC2-001             0                  09/24/20   11/09/20    OSWEGO MECHANICAL, INC.             
                                                            PC2-002             0                  09/24/20   11/09/20    OSWEGO MECHANICAL, INC.             
                                                            PC2-003             0                  09/24/20   11/09/20    OSWEGO MECHANICAL, INC.             
                                                            PC2-006        15,943                  09/24/20   11/09/20    OSWEGO MECHANICAL, INC.             
                                                            PC2-012        13,055                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            PC2-013             0                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            PC2-014             0                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            SC-009       -177,740                  08/04/21   04/13/22    ADHAN PIPING COMP, INC              
                                                            SC2-001      -200,000                  09/04/20   11/24/20    ADHAN PIPING CO.,INC.               
                                                            SC2-002        44,574                  09/04/20   04/08/21    ADHAN PIPING CO.,INC.               
                                                            SC2-003       110,967                  09/04/20   11/24/20    ADHAN PIPING CO.,INC.               
                                                            SC2-004             0                  09/04/20   11/24/20    ADHAN PIPING CO.,INC.               
                                                            SC2-005        -4,400                  01/27/21   03/18/21    ADHAN PIPING CO., INC.              
                                                            SC2-006             0                  01/27/21   03/18/21    ADHAN PIPING CO., INC.              
                                                            SC2-007        23,973                  01/27/21   03/18/21    ADHAN PIPING CO., INC.              
                                                            SC2-008       -10,500                  01/27/21   03/18/21    ADHAN PIPING CO., INC.              
                                                            SC2B-001            0                  02/10/22   11/30/22    Adhan Piping Comp Inc               
                                                            SC2B-002            0                  02/10/22   11/30/22    Adhan Piping Compy Inc              
                                                            SC2B-003       48,100                  02/10/22   11/30/22    Adhan Piping Compy Inc              
 
20-1175   Reconstruction               0-005-022  02/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0377   Reconstruction               0-005-023  11/09/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Minetto Elementary School:
90-1499   Reconstruction               0-008-007  06/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0687   Reconstruction               0-008-008  03/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1380   Reconstruction               0-008-009  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1279   Reconstruction               0-008-012  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0600   Reconstruction               0-008-013  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1-01           3,090                  08/16/04   12/17/04    Davis Wallbridge                    
                                                            C1-01           2,605                  08/17/04   12/17/04    Davis Wallbridge                    
                                                            C1-02           6,800                  08/17/04   09/16/04    Davis Wallbridge                    
                                                            C12-01           -113                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-02           -125                  05/26/05   05/31/05    PAC Associates of Oswego            
                                                            C12-03          3,630                  05/26/05   05/31/05    PAC Associates of Oswego            
                                                            C13-01          2,288                  05/26/05   05/31/05    Oswego Mechanical Inc               
                                                            C15-01            290                  12/15/04   12/28/04    Huen New York                       
 
08-0489   Reconstruction               0-008-014  05/27/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            106.1-6        16,000                  04/15/11     /  /      J&A MECHANICAL CONTRACTORS INC      
                                                            2012-006            0                  07/28/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-008            0                  07/28/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-011            0                  08/05/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-020            0                  07/30/10   09/03/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-021            0                  08/26/10   09/13/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-025            0                  08/26/10   09/13/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-029            0                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-031            0                  09/02/10   10/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-036            0                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-039        1,685                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-040        5,985                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-041       16,149                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-052            0                  11/02/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-060            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-062            0                  12/10/10   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-079          838                  12/24/10   02/09/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-085        3,150                  01/06/11   02/22/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-094          197                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-103        6,552                  02/25/11   03/18/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-107        1,042                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-108          897                  04/08/11   05/05/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-125        6,987                  06/06/11   07/15/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-145          360                  06/06/11   07/15/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-147        1,030                  06/06/11   07/15/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-154        9,491                  06/06/11   07/15/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-159        1,191                  06/06/11   07/15/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-179          751                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-181          775                  08/05/11   09/02/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-187          429                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-203        5,174                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-207          800                  08/31/11   09/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-211            0                  09/15/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-225          210                  09/20/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-250          605                  10/18/11     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-254      -51,000                  10/18/11   01/18/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-260        2,357                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-261       14,555                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-262        1,919                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-263         -791                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-264       11,430                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-280          620                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-285        3,495                  12/16/11   03/30/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-289       10,025                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-292        3,456                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-300          593                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-303       19,994                  12/23/11   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-309        5,220                  01/20/12   04/06/12    PAC & ASSOCAITES OF OSWEGO INC      
                                                            2012-314        2,310                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-316        2,264                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-331        9,517                  03/16/12   09/28/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-337      -43,610                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-342         -381                  06/12/12   11/09/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-342         -381                  09/14/12   01/25/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-345          300                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-351          630                  05/11/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-383          -64                  10/09/12   02/22/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-391          500                  12/12/12   03/14/13    PAC & ASSOCIATES OF OSWEGO, INC     
                                                            205.2-33       13,800                  12/27/11   02/21/12    siracusa mechanical, inc.           
                                                            205.2-51        4,071                  10/09/12   02/21/13    SIRACUSA MECHANICAL, INC.           
                                                            205.2045      -50,000                  06/29/12   11/16/12    Siracuse Mechanical, Inc.           
                                                            2052-001            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2052-004            0                  11/02/10   11/08/10    SIRACUSA MECHANICAL INC             
                                                            2052-039        1,897                  09/26/12   01/25/13    SIRACUSA MECHANICAL INC             
                                                            2052-053      -49,780                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            2052-055       -4,517                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            206.2-35        2,978                  12/27/11   02/21/12    Siracusa Mechanical, Inc.           
                                                            2062-011          713                  02/25/11   03/18/11    SIRACUSA MECHANICAL INC             
                                                            2062-051        4,439                  10/09/12   02/19/13    SIRACUSA MECHANICAL INC             
                                                            2062-25         1,529                  06/06/11   07/15/11    SIRACUSA MECHANICAL INC             
                                                            207.2-34            0                  03/28/11   04/22/11    PATRICIA ELECTRIC INC               
                                                            207.2-58        2,832                  09/15/11     /  /      PATRICIA ELECTRIC INC               
                                                            207.2-60        1,538                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-64          883                  10/06/11   12/13/11    PATRICIA ELECTRIC INC               
                                                            207.2-77        2,922                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-81        1,760                  11/14/11   01/25/12    PATRICIA ELECTRIC INC               
                                                            207.2-88        4,455                  12/23/11   06/28/12    PATRICIA ELECTRIC INC               
                                                            207.2-99            0                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-002       -1,952                  11/04/10   11/09/10    PATRICIA ELECTRIC INC               
                                                            2072-003            0                  11/04/10   11/09/10    PATRICIA ELECTRIC INC               
                                                            2072-004            0                  11/04/10   11/09/10    PATRICIA ELECTRIC INC               
                                                            2072-005            0                  11/04/10   11/09/10    PATRICIA ELECTRIC INC               
                                                            2072-011            0                  11/02/10   11/08/10    PATRICIA ELECTRIC INC               
                                                            2072-013            0                  11/22/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            2072-016            0                  11/22/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            2072-024            0                  12/24/10   02/09/11    PATRICIA ELECTRIC INC               
                                                            2072-100        1,344                  01/20/12   04/04/12    PATRICIA ELECTRIC INC               
                                                            2072-114          481                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-115        1,713                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-116        1,081                  05/30/12   10/12/12    PATRICIA ELECTRIC INC               
                                                            2072-122        6,133                  10/09/12   02/19/13    PATRICIA ELECTRIC INC               
 
12-0479   Reconstruction               0-008-016  07/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E2-003          4,504                  11/06/14   12/01/14    MEC Electric, Inc.                  
                                                            E2-006            727                  01/20/15   01/26/15    MEC Electric, Inc.                  
                                                            E2-010          1,561                  01/11/16   04/12/16    MEC Electric, Inc.                  
                                                            G2-001          3,041                  08/07/14   09/04/14    PAC & Associates of Oswego, Inc.    
                                                            G2-004         19,815                  09/26/14   10/08/14    PAC & Associates of Oswego, Inc.    
                                                            G2-008          1,996                  11/06/14   12/01/14    PAC & Associates of Oswego, Inc.    
                                                            G2-010          1,958                  12/15/14   01/07/15    PAC & Associates of Oswego, Inc.    
                                                            G2-012          4,055                  01/20/15   01/26/15    PAC & Assocaites of Oswego, Inc.    
                                                            G2-016            701                  07/15/15   08/11/15    PAC & Associates of Oswego, Inc.    
                                                            G2-017            329                  07/15/15   08/11/15    PAC & Associates of Oswego Inc.     
                                                            H2-001          1,482                  09/26/14   10/08/14    J&A Mechanical Contractors, Inc.    
                                                            H2-003          5,001                  11/06/14   12/01/14    J & A Mechanical Contractors, Inc.  
                                                            H2-005           -172                  09/02/15   09/15/15    J&A Mechanical Contractors Inc.     
                                                            P2-002          5,304                  12/15/14   01/07/15    Oswego Mechanical, Inc.             
                                                            P2-004          3,222                  03/04/15   03/26/15    Oswego Mechanical, Inc.             
                                                            R2-004         -2,278                  01/20/15   01/26/15    Diamond Roofing                     
                                                            R2-005          8,294                  01/30/15   02/03/15    Diamond Roofing                     
                                                            R2-009          3,195                  02/22/16   03/14/16    Diamond Roofing Co., Inc.           
 
17-0142   Reconstruction               0-008-017  09/11/17  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1572   Reconstruction               0-008-019  02/18/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAGC-02             0                  07/25/22     /  /      Paul Castaldo Inc                   
                                                            EC-07               0                  03/06/23   12/13/23    KNAPP ELEC INC                      
                                                            EC-08               0                  04/17/23   12/27/23    KNAPP ELECTRIC                      
                                                            EC-09               0                  09/18/23     /  /      KNAPP ELECTRIC INC                  
                                                            GC-04          15,964                  07/25/22     /  /      Paul Castaldo Inc                   
                                                            GC-19               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-21               0                  01/18/23   12/14/23    PAUL A CASTALDO INC                 
                                                            GC-31           7,657                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            GC-32           4,725                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            GC-34               0                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            GC-35           7,247                  04/17/23   01/02/24    PAUL A. CASTALDO                    
                                                            GC-37          10,112                  09/18/23   12/18/23    PAUL A CASTALDO INC                 
                                                            GC-45               0                  09/18/23   12/18/23    PAUL A CASTALDO INC                 
                                                            PC-15               0                  01/18/23   06/06/23    OSWEGO MECH INC                     
                                                            PC-17               0                  01/18/23   06/06/23    OSWEGO MECH INC                     
                                                            PC-19               0                  01/23/23   11/16/23    OSWEGO MECH INC                     
                                                            PC-20           9,187                  04/17/23   12/27/23    OSWEGO MECHANICAL                   
                                                            PC-22               0                  09/18/23     /  /      OSWEGO MECHANICAL INC               
 
02-0577FP Reconstruction               0-008-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Oswego High School:
91-1076   Reconstruction               0-018-011  04/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1584   Reconstruction               0-018-012  08/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1381   Reconstruction               0-018-013  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0003   Reconstruction               0-018-015  07/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1280   Reconstruction               0-018-018  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0601   Reconstruction               0-018-019  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD15-01         5,000           6,002  08/17/04   12/17/04    Huen New York                       
                                                            ADC12-02        3,795                  08/17/04   12/17/04    PAC Associates                      
                                                            ADC12-03        3,247                  08/17/04   12/17/04    PAC Associates                      
                                                            ALC1-02         7,125                  12/08/03   12/29/03    Davis Wallbridge                    
                                                            ALC1-03         1,677                  12/08/03   12/29/03    Davis Wallbridge                    
                                                            ALC1-04         3,000                  12/08/03   12/29/03    Davis Wallbridge                    
                                                            AlC1-04         3,000                  03/19/04   03/30/04    Davis Wallbridge                    
                                                            C1-01           2,100                  08/08/03   09/05/03    Davis Wallbridge                    
                                                            C1-01             593                  10/09/03   11/06/03    Davis Wallbridge                    
                                                            C1-02          -1,800                  10/09/03   11/06/03    Davis Wallbridge                    
                                                            C1-03          23,000          23,000  10/09/03   11/06/03    Davis Wallbridge                    
                                                            C12-01            470                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-01         19,500                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-02         15,300                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-03         18,830          18,830  08/17/04   12/17/04    PAC Associates                      
                                                            C12-04         14,258          14,258  08/17/04   12/17/04    PAC Associates                      
                                                            C12-05         14,519                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-06         21,778                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-07          3,751                  08/17/04   09/16/04    PAC Associates                      
                                                            C12-08          2,805                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-09          2,226                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-10          1,129                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-11          2,360                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-12            641                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-13            869                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-14         -1,851                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-15         11,184                  12/15/04   07/21/05    PAC Associates                      
                                                            C12-16            302                  12/15/04   12/28/04    PAC Associates                      
                                                            C12-17          6,604                  12/15/04   12/28/04    PAC Associates                      
                                                            C15-01         18,379                  08/17/04   12/17/04    Huen New York                       
                                                            C15-02          1,002                  08/17/04   12/17/04    Huen New York                       
                                                            C15-03          3,457                  12/15/04   07/21/05    Huen New York                       
                                                            C16-01          6,425                  08/17/04   12/17/04    J&A Mech.                           
                                                            C16-01          2,920                  08/17/04   09/16/04    J&A Mech.                           
                                                            C16-02          2,448                  08/17/04   09/16/04    J&A Mech.                           
                                                            C16-02          2,461                  12/15/04   12/28/04    J&A Mech.                           
                                                            C16-03          1,456                  12/15/04   12/28/04    J&A Mech.                           
                                                            C16-03            736                  12/15/04   12/28/04    J&A Mech.                           
                                                            C16-04           -391                  05/26/05   06/03/05    JandA Mechanical Contractors        
                                                            C16-05          3,744                  05/26/05   05/31/05    J and A Mechanical Contractors      
                                                            C2-01          49,210          49,210  08/08/03   09/05/03    Cory Wisinski Excavating            
                                                            C2-02          17,138          17,138  10/09/03   11/06/03    Cory Wisinski Excavating            
                                                            C2-03          19,470          19,470  04/27/04   05/12/04    Cory Wisinski Excavating            
                                                            C2-04          12,479          12,479  04/27/04   05/12/04    Cory Wisinski Excavating            
                                                            C4-01          -1,500                  05/26/05   06/03/05    MARS INC                            
                                                            C5-02          -5,000                  05/26/05   06/03/05    Western New York Flooring           
                                                            C5-03          -2,667                  05/26/05   05/31/05    Western New York Flooring           
                                                            C6-01           3,420                  05/26/05   05/31/05    Facilities Equipment and Service    
                                                            C6-02           1,860                  03/19/04   03/30/04    Facilities Equip.                   
                                                            C6-03           5,994                  03/19/04   03/30/04    Facilities Equip.                   
                                                            C6-04          -1,580                  05/26/05   06/03/05    Fsacilities Equipment and Service   
                                                            C8-01           9,918                  12/08/03   12/29/03    Cory Wisinski Excavating            
                                                            C9-01          13,380          13,380  12/08/03   12/29/03    Cory Wisinski Excavating            
                                                            C9-02          -1,545                  12/15/04   05/31/05    Cory Wisinski Excavating            
 
04-0155   Reconstruction               0-018-020  09/10/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C1-01         -78,450                  07/25/05   08/03/05    Rich Gardner construction           
                                                            c1-02           3,063                  07/25/05   08/03/05    Rich Gardner construction           
 
03-1180   Reconstruction               0-018-021  10/21/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-001           900                  09/25/06   10/24/06    sunshine Environmental              
                                                            100-002         4,299                  09/25/06   10/24/06    Sunshine Environmental              
                                                            100-002         4,299                  11/01/06   12/19/06    sunshine Environmental              
                                                            100-003         1,793                  11/01/06   12/19/06    Sunshine Environemental             
                                                            100-004         1,793                  11/01/06   12/19/06    Sunshine Environmental              
                                                            100-005         1,393                  11/01/06   12/19/06    Sunshine Environmental              
                                                            101-001         2,267                  09/25/06     /  /      PAC Associates                      
                                                            101-002        -4,796             238  02/05/07   03/23/07    PAC Associates                      
                                                            102- 001       22,057                  09/07/07   08/04/08    AIRTECH HEATING & AC SYSTEMS INC.   
                                                            102-002       108,000          60,000  09/22/08   01/13/11    Airtech Heating&AC Systems, Inc.    
                                                            103-001         4,360                  09/11/06   12/18/06    Patricia Electric                   
                                                            103-002             0                  02/21/08   08/05/08    PATRICIA ELECTRIC INC               
 
07-1692   Additions and Alterations    0-018-022  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-01         -1,300                  10/29/09   12/28/09    JWJ INDUSTRIES                      
                                                            100-02              0                  12/10/10   01/20/11    JWJ INDUSTRIES                      
                                                            100-3         -14,074                  06/06/11   06/10/11    JWJ INDUSTRIES                      
                                                            100-4         -19,173                  06/06/11   06/10/11    JWJ INDUSTRIES                      
                                                            101-01              0                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-02         -8,885                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-03         -1,472                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-04              0                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-05              0                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-06              0                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-07              0                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-08              0                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-09           -286                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-100        10,765                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-101         6,585                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-102             0                  11/04/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-103        11,399                  11/04/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-104        16,439                  11/02/10   11/12/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-105       -12,593                  12/24/10   01/11/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-106         1,812                  12/24/10   01/11/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-107         7,518                  12/24/10   01/11/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-108         1,383                  12/24/10   03/21/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-11        -22,033                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-110        -4,805                  01/06/11   01/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-112           194                  01/06/11   01/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-113           768                  01/06/11   01/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-114           178                  01/06/11   01/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-115         2,000                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-116        -1,490                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-117          -791                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-118             0                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-119        -2,740                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-120         2,439                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-121         4,766                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-122         3,538                  04/15/11   05/13/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-123         2,298                  06/06/11   06/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-124          -101                  06/06/11   06/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-125           192                  06/06/11   06/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-126         9,690                  06/06/11   06/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-127        -5,108                  06/06/11   06/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-128         1,131                  06/06/11   06/10/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-129             0                  08/05/11   09/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-13        -18,072                  03/03/11   03/25/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-130           716                  08/05/11   09/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-131         2,354                  08/05/11   09/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-132           568                  08/05/11   09/07/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-133         1,508                  09/15/11   11/23/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-134         1,644                  12/23/11   08/07/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-135          -114                  12/23/11   08/07/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-136        19,379                  12/23/11   08/07/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-137           -20                  12/23/11   08/07/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-138       -28,806                  12/23/11   08/07/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-139        -8,250                  12/23/11   08/07/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-14              0                  09/11/09   09/15/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-140       -10,000                  12/23/11   08/07/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-141        -1,644                  03/16/12   08/06/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-142           182                  03/16/12   08/06/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-143         1,636                  10/09/12   02/19/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-145          -813                  10/09/12   02/19/13    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-15              0                  09/11/09   09/15/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-16         53,550                  09/11/09   09/15/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-17              0                  09/11/09   09/15/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-18              0                  10/05/09   11/18/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-19              0                  10/13/09   10/28/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-20              0                  10/13/09   10/28/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-21              0                  10/13/09   10/28/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-22              0                  10/29/09   12/28/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-23              0                  10/29/09   12/28/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-24              0                  10/29/09   12/28/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-25              0                  10/29/09   12/28/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-26              0                  10/29/09   12/28/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-27              0                  10/13/09   10/28/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-29              0                  10/13/09   10/28/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-30          1,821                  12/10/09   01/20/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-31            914                  12/10/09   01/20/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-32          7,064                  01/04/10   02/26/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-33          3,704                  01/04/10   02/26/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-34            659                  01/04/10     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-35            659                  01/04/10   02/18/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-36            630                  01/04/10   02/18/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-37          3,794                  01/04/10   02/18/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-38              0                  02/03/10   02/18/10    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-39          1,227                  02/03/10   02/18/10    PAC & ASSOCAITES OF OSEWEGO, INC.   
                                                            101-40          1,712                  02/03/10   02/18/10    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-42          1,266                  02/03/10   02/18/10    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-43            650                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-45          1,893                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-46          1,730                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-47              0                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-48              0                  02/22/10   04/02/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-49          1,295                  02/22/10   04/02/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-50            826                  02/22/10   04/02/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-51              0                  02/22/10   04/02/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-52              0                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-53            262                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-54            956                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-55            560                  02/25/10     /  /      PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-56            724                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO ING      
                                                            101-57            200                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-58            597                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-59         11,946                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-60          2,426                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-61          1,566                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-63          1,422                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-64            760                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-65          1,570                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-66          5,188                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-67          1,043                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-68          2,645                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-69            648                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-70          1,445                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-71            186                  04/26/10   05/11/10    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-72          4,293                  04/14/10   05/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-73         -1,025                  04/14/10   05/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-75            140                  04/14/10   05/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-76          7,874                  04/26/10   05/11/10    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-77          1,100                  05/28/10   07/20/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-78          3,254                  05/28/10   07/21/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-79          9,496                  07/14/10   11/17/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-81          1,168                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-82            559                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-83            202                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-84            724                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-85          4,851                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-86            762                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-87            887                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-88          1,003                  07/30/10   09/14/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-89          1,191                  08/02/10   09/22/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-90              0                  04/04/11   04/21/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-92            344                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-93         29,766                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-94              0                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-95         25,187                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-96         24,562                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-97          5,404                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-98         20,593                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-99          3,189                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            102-01         -3,500                  10/29/09   12/24/09    DIAMOND ROOFING COMPANY INC         
                                                            102-02              0                  10/05/09   11/18/09    DIAMOND ROOFING                     
                                                            102-023           567                  11/04/10   11/08/10    DIAMOND ROOFING                     
                                                            102-06              0                  10/29/09   12/24/09    DIAMOND ROOFING                     
                                                            102-07              0                  10/29/09   12/24/09    DIAMOND ROOFING                     
                                                            102-08              0                  01/04/10   02/18/10    DIAMOND ROOFING                     
                                                            102-09        -41,553                  01/04/10   02/18/10    DIAMOND ROOFING                     
                                                            102-11              0                  01/04/10   02/18/10    DIAMOND ROOFING                     
                                                            102-12         10,003                  02/25/10   04/05/10    DIAMOND ROOFING                     
                                                            102-13         12,812                  02/25/10   04/05/10    DIAMOND ROOFING                     
                                                            102-14         14,829                  02/25/10   04/05/10    DIAMOND ROOFING                     
                                                            102-15          9,724                  02/22/10   04/02/10    DIAMOND ROOFING                     
                                                            102-16         -3,393                  04/14/10   05/24/10    DIAMOND ROOFING                     
                                                            102-17              0                  06/08/10   08/17/10    DIAMOND ROOFING                     
                                                            102-18              0                  07/28/10   09/07/10    DIAMOND ROOFING                     
                                                            102-19              0                  08/02/10   09/22/10    DIAMOND ROOFING                     
                                                            102-20              0                  08/02/10   09/22/10    DIAMOND ROOFING                     
                                                            102-21          1,254                  09/02/10   09/22/10    DIAMOND ROOFING                     
                                                            102-22            581                  09/02/10   09/22/10    DIAMOND ROOFING                     
                                                            102-24         -6,886                  03/28/11   04/22/11    DIAMOND ROOFING                     
                                                            103-01              0                  01/04/10   02/18/10    ACCURATE ACOUSTICAL INC             
                                                            103-02              0                  01/04/10   02/18/10    ACCURATE ACOUSTICAL INC             
                                                            103-03         -2,000                  01/04/10   02/18/10    ACCURATE ACOUSTICAL INC             
                                                            103-04              0                  02/22/10   04/02/10    ACCURATE ACOUSTICAL INC             
                                                            103-05              0                  02/22/10   04/02/10    ACCURATE ACOUSTICAL INC             
                                                            103-06              0                  02/25/10   04/05/10    ACCURATE ACOUSTICAL INC             
                                                            103-07              0                  04/07/10   06/15/10    ACCURATE ACOUSTICAL INC             
                                                            103-09           -509                  04/14/10   05/24/10    ACCURATE ACOUSTICAL INC             
                                                            103-10             74                  07/28/10   09/07/10    ACCURATE ACOUSTICAL INC             
                                                            103-11              0                  08/02/10   09/22/10    ACCURATE ACOUSTICAL INC             
                                                            103-12        -15,704                  03/28/11   04/22/11    ACCURATE ACOUSTICAL INC             
                                                            103-13           -140                  06/27/11   07/15/11    ACCURATE ACOUSTICAL INC             
                                                            103-14           -246                  03/16/12   08/06/12    ACCURATE ACOUSTICAL INC             
                                                            103-15           -700                  03/16/12   08/06/12    ACCURATE ACOUSTICAL INC             
                                                            103-16          5,212                  03/16/12   02/19/13    ACCURATE ACOUSTICAL INC             
                                                            104-01           -798                  10/05/09   11/18/09    SPENCER-VIRNOCHE INC                
                                                            104-03         30,378                  01/04/10   02/26/10    SPENCER-VIRNOCHE INC                
                                                            104-04              0                  01/04/10   02/26/10    SPENCER-VIRNOCHE INC                
                                                            104-05           -500                  01/04/10   02/26/10    SPENCER-VIRNOCHE INC                
                                                            104-06           -402                  04/14/10   05/24/10    SPENCER-VIRNOCHE INC                
                                                            104-07           -140                  04/14/10   05/24/10    SPENCER-VIRNOCHE INC                
                                                            104-08           -413                  04/14/10   05/24/10    SPENCER-VIRNOCHE INC                
                                                            104-09           -387                  04/14/10   05/24/10    SPENCER-VIRNOCHE INC                
                                                            104-10         -4,674                  04/14/10   05/24/10    SPENCER-VIRNOCHE INC                
                                                            104-11         -3,430                  04/14/10   05/24/10    SPENCER-VIRNOCHE INC                
                                                            104-12         19,627                  06/08/10   08/17/10    SPENCER-VIRNOCHE INC                
                                                            104-13           -599                  07/28/10   09/07/10    SPENCER-VIRNOCHE INC                
                                                            104-14        -10,727                  09/23/10   11/18/10    SPENCER-VIRNOCHE INC                
                                                            104-15         -8,308                  03/14/11   06/24/11    SPENCER-VIRNOCHE INC                
                                                            105-01           -859                  04/14/10   05/24/10    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-013       -25,000                  12/23/12   07/16/13    Airtech Heating & AC Systems, Inc.  
                                                            105-014       -22,219                  12/23/12   09/18/13    Airtech Heating & AC Systems, Inc.  
                                                            105-015          -246                  12/23/12   07/03/13    Airtech Heating & AC Systems, Inc.  
                                                            105-016          -186                  12/23/12   07/03/13    Airtech heating & AC Systems, Inc.  
                                                            105-017          -400                  12/23/12   07/03/13    Airtech Heating & AC Systems, Inc.  
                                                            105-10           -262                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-11              0                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-12        -16,262                  12/23/12   09/18/13    Airtech Heating & AC Systems, Inc.  
                                                            105-2               0                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-3               0                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-4               0                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-5               0                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-6               0                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-7               0                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-8            -235                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            105-9            -202                  08/01/11   09/20/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            106-01              0                  09/11/09   09/15/09    SIRACUSE MECHANICAL, INC.           
                                                            106-02              0                  09/11/09   09/15/09    SIRACUSE MECHANICAL, INC.           
                                                            106-03              0                  09/11/09   09/15/09    SIRACUSE MECHANICAL, INC.           
                                                            106-04              0                  10/29/09   12/24/09    SIRACUSA MECHANICAL INC             
                                                            106-040         1,599                  11/02/10   11/12/10    SIRACUSA MECHANICAL INC             
                                                            106-041         6,773                  11/22/10   11/30/10    SIRACUSA MECHANICAL INC             
                                                            106-042         2,346                  11/22/10   11/30/10    SIRACUSA MECHANICAL INC             
                                                            106-043         2,668                  01/06/11   01/27/11    SIRACUSA MECHANICAL INC             
                                                            106-047           -43                  06/06/11   06/10/11    SIRACUSA MECHANICAL INC             
                                                            106-048       -25,000                  06/06/11   06/10/11    SIRACUSA MECHANICAL INC             
                                                            106-05              0                  10/13/09   10/28/09    SIRACUSE MECHANCIAL, INC.           
                                                            106-06              0                  10/13/09   10/28/09    SIRACUSE MECHANICAL, INC.           
                                                            106-07              0                  10/13/09   10/28/09    SIRACUSA MECHANICAL, INC.           
                                                            106-08          2,834                  12/10/09   01/20/10    SIRACUSA MECHANICAL INC             
                                                            106-09              0                  12/10/09   01/20/10    SIRACUSA MECHANICAL INC             
                                                            106-10         10,538                  12/10/09   01/21/10    SIRACUSA MECHANICAL INC             
                                                            106-13          6,698                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-14            972                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-15          2,961                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-16          2,001                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-17          2,639                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-18          1,622                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-19           -638                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-20         -1,023                  02/25/10   04/05/10    SIRACUSA MECHANICAL INC             
                                                            106-21          1,300                  04/07/10   06/15/10    SIRACUSA MECHANICAL INC             
                                                            106-22            791                  04/07/10   06/15/10    SIRACUSA MECHANICAL INC             
                                                            106-23          2,171                  04/07/10   06/15/10    SIRACUSA MECHANICAL INC             
                                                            106-24         15,579                  04/07/10   06/15/10    SIRACUSA MECHANICAL INC             
                                                            106-25          5,221                  04/07/10   06/15/10    SIRACUSA MECHANICAL INC             
                                                            106-26          3,439                  04/07/10   06/15/10    SIRACUSA MECHANICAL INC             
                                                            106-27         -6,975                  04/14/10   05/24/10    SIRACUSA MECHANICAL INC             
                                                            106-28          8,176                  06/08/10   08/17/10    SIRACUSA MECHANICAL INC             
                                                            106-32            104                  07/28/10   09/07/10    SIRACUSA MECHANICAL INC             
                                                            106-33            926                  07/28/10   09/07/10    SIRACUSA MECHANICAL INC             
                                                            106-34          1,340                  07/28/10   09/07/10    SIRACUSA MECHANICAL INC             
                                                            106-35            711                  07/28/10   09/07/10    SIRACUSA MECHANICAL INC             
                                                            106-36          4,600                  07/28/10   09/07/10    SIRACUSA MECHANICAL INC             
                                                            106-37          3,427                  09/02/10   09/22/10    SIRACUSA MECHANICAL INC             
                                                            106-38          5,618                  09/02/10   09/22/10    SIRACUSA MECHANICAL INC             
                                                            106-39          1,490                  11/02/10   11/30/10    SIRACUSA MECHANICAL INC             
                                                            106-44          3,197                  03/14/11   06/24/11    SIRACUSA MECHANICAL INC             
                                                            106-45          2,967                  03/14/11   06/24/11    SIRACUSA MECHANICAL INC             
                                                            106-46          1,489                  03/14/11     /  /      SIRACUSA MECHANICAL INC             
                                                            106-49        -33,025                  06/06/11   06/10/11    SIRACUSA MECHANICAL INC             
                                                            106-50          2,482                  07/29/11   09/20/11    SIRACUSA MECHANICAL INC             
                                                            106-51          2,753                  08/31/11   09/19/11    SIRACUSA MECHANICAL INC             
                                                            106-52          2,440                  08/31/11   11/08/11    SIRACUSA MECHANICAL INC             
                                                            106.1-2        15,304                  04/15/11   05/13/11    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-3         1,463                  04/15/11   05/13/11    J&A MECHANICAL CONTRACTORS INC      
                                                            107-01              0                  09/11/09   09/15/09    PATRICIA ELECTRIC INC               
                                                            107-03              0                  08/28/09   09/01/09    PATRICIA ELECTRIC, INC.             
                                                            107-04              0                  09/11/09   09/15/09    PATRICIA ELECTIRC, INC.             
                                                            107-042           614                  09/02/10   09/22/10    PATRICIA ELECTRIC INC               
                                                            107-043             0                  11/22/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-044         1,685                  11/22/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-045           140                  01/06/10   01/27/11    PATRICIA ELECTRIC INC               
                                                            107-05              0                  09/11/09   09/15/09    PATRICIA ELECTRIC, INC.             
                                                            107-06              0                  09/11/09   09/15/09    PATRICIA ELECTRIC, INC.             
                                                            107-07              0                  10/05/09   11/18/09    PATRICIA ELECTRIC INC               
                                                            107-10              0                  12/10/09   01/20/10    PATRICIA ELECTRIC INC               
                                                            107-11              0                  12/10/09   01/21/10    PATRICIA ELECTRIC INC               
                                                            107-12         14,690                  12/10/09   01/20/10    PATRICIA ELECTRIC INC               
                                                            107-13           -301                  01/04/10   02/26/10    PATRICIA ELECTRIC INC               
                                                            107-14              0                  01/04/10   02/26/10    PATRICIA ELECTRIC INC               
                                                            107-15              0                  01/04/10   02/26/10    PATRICIA ELECTRIC INC               
                                                            107-16         16,527                  01/04/10   02/26/10    PATRICIA ELECTRIC INC               
                                                            107-17              0                  01/04/10   02/26/10    PATRICIA ELECTRIC INC               
                                                            107-19          1,525                  03/25/10   04/05/10    PATRICIA ELECTRIC INC               
                                                            107-20              0                  02/25/10   04/05/10    PATRICIA ELECTRIC INC               
                                                            107-23              0                  04/07/10   06/15/10    PATRICIA ELECTRIC INC               
                                                            107-25          1,740                  04/23/10   07/21/10    PATRICIA ELECTRIC INC               
                                                            107-26            694                  04/26/10   05/11/10    PATRICIA ELECTRIC, INC.             
                                                            107-27          1,776                  04/26/10   05/11/10    PATRICIA ELECTRTIC, INC.            
                                                            107-28          3,415                  04/26/10   05/11/10    PATRICIA ELECTRIC, INC.             
                                                            107-29            365                  05/07/10   08/06/10    PATRICIA ELECTRIC INC               
                                                            107-30            414                  04/26/10   05/28/10    PATRICIA ELECTRIC INC               
                                                            107-31            586                  05/07/10   08/06/10    PATRICIA ELECTRIC INC               
                                                            107-32              0                  04/26/10   05/11/10    PATRICIA ELECTRIC INC               
                                                            107-33            761                  05/07/10   08/06/10    PATRICIA ELECTRIC INC               
                                                            107-34         -3,526                  04/26/10   05/11/10    PATRICIA ELECTRIC, INC.             
                                                            107-35          4,688                  05/28/10   07/21/10    PATRICIA ELECTRIC INC               
                                                            107-37            759                  06/08/10   08/17/10    PATRICIA ELECTRIC INC               
                                                            107-39          1,007                  09/15/10   09/27/10    PATRICIA ELECTRIC INC               
                                                            107-40          7,156                  09/13/10   09/23/10    PATRICIA ELECTRIC INC               
                                                            107-41            723                  09/02/10   09/22/10    PATRICIA ELECTRIC INC               
                                                            107-47          4,409                  03/14/11   06/24/11    PATRICIA ELECTRIC INC               
                                                            107-48            791                  03/14/11   06/24/11    PATRICIA ELECTRIC INC               
                                                            107-49            987                  03/14/11   06/24/11    PATRICIA ELECTRIC INC               
                                                            107-50          2,792                  03/14/11   06/24/11    PATRICIA ELECTRIC INC               
                                                            107-51        -14,600                  03/28/11   04/22/11    PATRICIA ELECTRIC INC               
                                                            107-54          9,205                  07/29/11   10/24/12    PATRICIA ELECTRIC INC               
                                                            107-55          3,186                  07/29/11   09/20/11    PATRICIA ELECTRIC INC               
                                                            107-56        -25,000                  11/22/11   02/23/12    PATRICIA ELECTRIC INC               
                                                            107-57        -20,000                  11/22/11   02/23/12    PATRICIA ELECTRIC INC               
                                                            107300            101                  04/26/10     /  /      PATRICIA ELECTRIC, INC.             
                                                            2012-033            0                  11/04/10   11/08/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-051            0                  11/02/10   11/12/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-071       16,212                  12/24/10   01/11/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-355        5,761                  05/30/12   10/23/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2052-008            0                  01/06/11   01/27/11    SIRACUSA MECHANICAL INC             
                                                            D01-109        10,315                  01/06/11   01/27/11    PAC & ASSOCIATES OF OSWEGO INC      
 
07-1262   Reconstruction               0-018-023  02/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            12,736                  02/17/09   04/03/09    PAC ASSOCIATES OF OSWEGO, INC.      
                                                            002            18,633                  02/17/09   04/03/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            003            17,599                  02/17/09   04/03/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            004               273                  02/17/09   04/03/09    PATRICIA ELECTRIC, INC.             
                                                            006             7,003                  02/17/09   04/03/09    PATRICIA ELECTRIC, INC.             
                                                            007             3,869                  02/17/09   04/03/09    PATRICIA ELECTRIC, INC.             
                                                            008             3,176                  02/17/09   04/03/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            009               615                  02/04/10   05/13/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            010               -77                  04/07/10   06/16/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            011               940                  04/07/10   06/16/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            102-001       -20,000                  12/13/12   06/28/13    AIRTECH HEATING & AC SYSTEMS INC    
                                                            102-002         4,726                  12/13/12   06/28/13    AIRTECH HEATING & AC SYSTEMS INC    
                                                            102-003          -460                  12/13/12   06/28/13    AIRTECH HEATING & AC SYSTEMS INC    
                                                            102-004         3,556                  12/13/12   06/28/13    AIRTECH HEATING & AC SYSTEMS INC    
                                                            102-005           898                  12/13/12   06/28/13    AIRTECH HEATING & AC SYSTEMS INC    
                                                            103-8          -5,000                  04/20/11   05/17/11    PATRICIA ELECTRIC INC               
 
08-0089   Reconstruction               0-018-024  07/25/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            106-05          1,271                  09/11/09   06/22/10    J&A MECHAICAL CONTRACTORS, INC.     
                                                            106.1           3,165                  07/29/09   07/29/10    J&A MECHANICAL CONTRACTORS, INC.    
                                                            106.1-05            0                  10/29/09   06/22/10    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-10          572                  08/01/11   06/17/19    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-11          325                  08/05/11   06/17/19    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-12          142                  08/05/11   06/17/19    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-13        4,062                  11/14/11   02/08/13    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-7         1,428                  04/15/11   05/10/11    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-8         1,656                  08/01/11   06/17/19    J&A MECHANICAL CONTRACTORS INC      
                                                            106.1-9         2,235                  08/05/11   06/17/19    J&A MECHANICAL CONTRACTORS INC      
 
11-0951   Reconstruction               0-018-025  06/06/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            302-002       -24,691                  01/31/14   03/05/14    Diamond Roofing                     
                                                            302-003       -11,648                  01/31/14   03/05/14    Diamond Roofing                     
 
11-1216   Reconstruction               0-018-026  10/03/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            301B-001      -10,427                  04/07/14   04/21/14    PAC & Associates of Oswego, Inc.    
                                                            302B-001         -100                  10/31/13   12/04/13    Airtech Heating & AC Systems, Inc.  
                                                            302B-002       -4,095                  04/07/14   04/21/14    Air Tech Heating & Air Conditioning 
                                                            302B-002         -939                  05/27/14   06/27/14    Airtech Heating & AC Systems, Inc.  
                                                            303B-001       12,206                  05/06/13   01/27/14    Oswego Mechancial, Inc.             
                                                            303B-002        1,668                  10/31/13   12/04/13    Oswego Mechanical, Inc.             
                                                            303B-003        3,975                  10/31/13   02/11/14    Oswego Mechanical, Inc.             
                                                            303B-004          266                  11/08/13   12/04/13    Oswego Mechancial, Inc.             
                                                            303B-005        1,359                  01/06/14   01/27/14    Oswego Mechanical, Inc.             
                                                            303B-006        2,190                  01/06/14   01/27/14    Oswego Mechanical, Inc.             
                                                            304B-001            0                  10/31/13   12/04/13    Weydman Electric & Communications   
                                                            304B-002            0                  10/31/13   12/04/13    Weydman Electric & Communications   
                                                            304B-003            0                  10/31/13   12/04/13    Weydman Electric & Communications   
                                                            304B-004       -6,845                  06/06/14   07/02/14    Weydman Electric & Communications   
 
12-0480   Reconstruction               0-018-027  07/30/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-001        17,335                  04/25/14   05/05/14    McGinnis Nelson Construction        
                                                            E2-009            366                  01/11/16   04/21/16    MEC Electric, Inc.                  
                                                            G2-019         19,538                  09/02/15   09/15/15    PAC & Associates of Oswego Inc.     
                                                            G2-022         -2,460                  02/22/16   03/14/16    PAC & Associates of Oswego, Inc.    
                                                            G2-023          4,764                  03/07/16   03/16/16    PAC & Associates of Oswego, Inc.    
                                                            G2-024          1,229                  04/07/16   05/19/16    PAC & Associates of Oswego, Inc.    
                                                            H2-011          1,577                  04/07/16   05/19/16    J&A Mechanical Contractors, Inc.    
                                                            H2-012          6,494                  07/18/16   09/30/16    J&A MECHANICAL CONTRACTORS          
                                                            R2-008          3,898                  02/22/16   02/29/16    Diamond Roofing Co., Inc.           
                                                            R2-010          5,300                  02/22/16   03/14/16    Diamond Roofing Co., Inc.           
 
16-1894   Reconstruction               0-018-028  02/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC6B-01         1,092                  11/08/18   12/03/18    ROMBOUGH ELECTRIC INC               
                                                            EC6B-02         2,461                  11/08/18   12/03/18    ROMBOUGH ELECTRIC INC               
                                                            EC6B-03         5,699                  11/08/18   12/03/18    ROMBOUGH ELECTRIC INC               
                                                            EC6B04          2,878                  03/07/19   03/12/19    ROMBOUGH ELECTRIC, INC              
                                                            GC6A-01           836                  10/09/18   01/25/19    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC6A-02         2,378                  10/09/18   01/25/19    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC6A03         -1,192                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO,INC.       
                                                            GC6B-01         3,059                  10/09/18   01/25/19    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC6B-10         1,110                  03/29/19   04/01/19    PAC ASSOCIATES OF OSWEGO,INC.       
                                                            GC6B02         13,799                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC.      
                                                            GC6B03          4,725                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC       
                                                            GC6B04          2,100                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC       
                                                            GC6B05         -1,642                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC       
                                                            GC6B06            842                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC       
                                                            GC6B07            606                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC       
                                                            GC6B08         -2,000                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC       
                                                            GC6B09            521                  03/07/19   03/12/19    PAC ASSOCIATES OF OSWEGO, INC       
 
19-0955   Reconstruction               0-018-029  04/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-002         8,214                  09/24/20   11/09/20    ROMBOUGH ELECTRIC, INC.             
                                                            EC2-004        11,626                  09/24/20   11/09/20    ROMBOUGH ELECTRIC, INC.             
                                                            EC2-006             0                  09/24/20   11/09/20    ROMBOUGH ELECTRIC, INC.             
                                                            EC2-007         5,757                  07/26/21   04/05/22    Rombough Elecric Inc                
                                                            EC2-010             0                  07/26/21   04/05/22    Rombough Electric Inc               
                                                            EC2-011             0                  07/26/21   04/05/22    Rombough Electrtic Inc              
                                                            EC2-017             0                  07/26/21   04/05/22    Rombough Electrtic Inc              
                                                            EC2-018             0                  07/26/21   04/05/22    Rombough Electric Inc               
                                                            EC2-024             0                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-025             0                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-026         1,272                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-027             0                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-028         1,947                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-029           861                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-030           775                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-031         5,638                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-032         1,315                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-036        10,364                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-040         1,241                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-042         1,622                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-043        11,157                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-045         5,557                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-049         3,325                  12/03/21   09/20/22    Rombough Electric, Inc.             
                                                            EC2-050         4,525                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-051         5,940                  12/03/21   09/20/22    Rombough Elec, Inc                  
                                                            EC2-052         3,585                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            EC2-053             0                  12/03/21   09/20/22    Rombough Elec Inc                   
                                                            GC2-002             0                  07/21/20   10/28/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-012             0                  10/08/20   12/09/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-014             0                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-016        23,184                  09/04/20   11/24/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-018        20,891                  09/24/20   11/25/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC2-024             0                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-025         2,970                  11/02/21   12/07/22    MCk Bldg Assoc, Inc                 
                                                            GC2-027         4,470                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-029             0                  11/02/21   12/07/22    MCK Bldg Assoc, Inc                 
                                                            GC2-031        13,650                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-034        13,072                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-035         5,726                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-036           836                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-040         1,575                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-044           786                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-047         2,656                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-051           917                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-054         5,706                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-055         5,772                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-056           955                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-057         2,051                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-060        35,235                  01/18/22   12/27/22    MCK Bldg Assoc Inc                  
                                                            GC2-062        -1,369                  01/18/22     /  /      MCK Bldg Assoc Inc                  
                                                            MC2-005        10,844                  09/04/20   11/05/20    NAIRY MECHANICAL, INC.              
                                                            MC2-006             0                  09/04/20   11/05/20    NAIRY MECHANICAL, LLC               
                                                            MC2-007             0                  09/04/20   11/05/20    NAIRY MECHANICAL, LLC               
                                                            MC2-008         7,149                  09/04/20   11/05/20    NAIRY MECHANICAL, LLC               
                                                            MC2-009             0                  11/02/21   12/13/22    Nairy Mech, LLC                     
                                                            MC2-011        21,252                  11/02/21   12/13/22    Nairy Mech, LLC                     
                                                            MC2-012        -1,365                  11/02/21   12/13/22    Nairy Mech, LLC                     
                                                            MC2-013             0                  11/02/21   12/13/22    Nairy Mech, LLC                     
                                                            MC2-015             0                  11/02/21   12/13/22    Nairy Mechanical, LLC               
                                                            MC2-018         5,504                  12/03/21   09/20/22    Nairy Mech                          
                                                            MC2-019         7,064                  12/03/21   09/20/22    Nairy Mech LLC                      
                                                            MC2-021         4,649                  12/03/21   09/20/22    Nairy Mech LLC                      
                                                            MC2-025         3,506                  01/18/22   11/01/22    Nairy Mech LLC                      
                                                            PC2-004       -28,924                  09/24/20   11/09/20    OSWEGO MECHANICAL, INC.             
                                                            PC2-005        23,919                  09/24/20   11/09/20    OSWEGO MECHANICAL, INC.             
                                                            PC2-007             0                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            PC2-008         7,196                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            PC2-009        15,983                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            PC2-010             0                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            PC2-011         8,579                  10/18/21   12/05/22    Oswego Mech, Inc                    
                                                            PC2-015        -4,417                  11/02/21   12/09/22    Oswego Mech, Inc                    
 
20-1176   Reconstruction               0-018-032  02/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXManuf'd CR BLDG @ MS Demo'd 2020:
90-1621   New Construction             0-023-001  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXDistrict Office  - Sold 2018:
01-1281   Reconstruction               1-006-002  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1755   Reconstruction               1-006-003  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-41          3,630                  02/03/10   02/18/10    PAC & ASSOCATES OF OSWEGO, INC.     
                                                            101-44          1,744                  02/25/10   04/05/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-62          3,701                  04/07/10   06/15/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-74          3,050                  04/14/10   05/24/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            103-08         -3,148                  04/14/10   05/24/10    ACCURATE ACOUSTICAL INC             
                                                            106-12              0                  02/25/10   04/05/10    SIRACUSA MECHANICAL                 
                                                            107-21              0                  02/25/10   04/05/10    PATRICIA ELECTRIC INC               
                                                            107-22          2,439                  04/14/10   05/24/10    PATRICIA ELECTRIC INC               
                                                            107-24          4,347                  04/14/10   05/24/10    PATRICIA ELECTRIC INC               
                                                            2012-015        2,450                  07/30/10   09/14/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            2012-018        1,350                  07/30/10   09/14/10    PAC & ASSOCIATES OF OSWEGO INC      
 

          XXAdministration Offices (sold 2018):
92-1200   Reconstruction               1-028-002  06/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1382   Reconstruction               1-028-003  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1383   Reconstruction               1-028-004  05/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1600   Reconstruction               1-028-006  06/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,500                  08/13/14   09/04/14    C&S Technical Resources             
 

          District Warehouse:
92-1585   Reconstruction               2-009-002  08/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1282   Reconstruction               2-009-003  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1693   Reconstruction               2-009-004  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-10              0                  12/10/09   01/20/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-12              0                  07/28/09   08/10/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            101-28              0                  10/13/09   10/28/09    PAC & ASSOCITES OF OSWEGO, INC.     
                                                            102-04              0                  10/05/09   11/19/09    DIAMOND ROOFING                     
                                                            107-02              0                  07/29/09   08/10/09    PATRICIA ELECTRIC, INC.             
                                                            107-38            614                  06/08/10   08/17/10    PATRICIA ELECTRIC INC               
                                                            107-53          5,094                  06/27/11   07/15/11    PATRICIA ELECTRIC INC               
 

          Red Barn:
07-1694   Reconstruction               2-010-001  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            102-05              0                  10/05/09   11/18/09    DIAMOND ROOFING                     
                                                            102-10              0                  01/04/10   02/18/10    DIAMOND ROOFING                     
 

          OMS Storage / ToiletFacility:
19-0956   Reconstruction               2-011-002  04/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXHS StorageBldg/BleachersDemo'd2020:
19-1807   Reconstruction               2-026-002  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          OMS Storage Bldg. (PoleBarn):
19-0957   Alterations                  2-049-001  04/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stadium Equipment Storage:
19-0958   New Construction             2-050-001  04/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage Bldg:
07-1695   Reconstruction               4-014-003  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-34          2,331                  01/04/10   02/18/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            102-03              0                  10/05/09   11/18/09    DIAMOND ROOFING                     
                                                            106-29         20,480                  07/28/10   09/07/10    SIRACUSA MECHANICAL INC             
                                                            106-30          3,093                  07/28/10   09/07/10    SIRACUSA MECHANICAL INC             
                                                            106-31         10,530                  07/30/10   09/14/10    SIRACUSA MECHANICAL INC             
                                                            107-46         17,179                  03/14/11   06/24/11    PATRICIA ELECTRIC INC               
 

          Transportation Center:
96-0097   Reconstruction               5-007-001  08/02/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1283   Reconstruction               5-007-002  05/29/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0602   Reconstruction               5-007-003  05/27/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            C12-01            480                  08/17/04   12/17/04    PAC Associates                      
                                                            C12-02           -800                  12/15/04   05/31/05    PAC Associates                      
                                                            C12-03            990                  05/26/05   05/31/05    PAC Associates                      
                                                            C12-04            514                  12/15/04   05/31/05    PAC Associates                      
                                                            C12-05            924                  11/03/06   11/08/06    PAC Associates                      
                                                            C15-01            175                  12/15/04   12/28/04    Huen New York                       
 
07-1696   Reconstruction               5-007-004  11/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-111         1,651                  01/06/11   01/27/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-144         5,014                  09/13/12   12/31/12    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-80          3,916                  07/28/10   09/07/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            101-91            476                  11/04/10   11/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            104-02              0                  12/10/09   01/20/10    SPENCER-VIRNOCHE INC                
                                                            106-11         32,529                  12/10/09   01/20/10    SIRACUSA MECHANICAL INC             
                                                            107-08              0                  10/29/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-09         27,674                  10/29/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-18         19,815                  01/04/10   02/26/10    PATRICIA ELECTRIC INC               
                                                            107-36            190                  07/14/10   11/17/10    PATRICIA ELECTRIC INC               
 

          XXPress Box @HS Demo'd 2020:
19-1808   Reconstruction               7-012-001  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXConcessionStand Demo'd 2020:
19-1809   Reconstruction               7-017-002  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXDugout Home Team Demo'd 2020:
19-1810   Reconstruction               7-042-002  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXDugout Visiting Team-Demo'd 2020:
19-1811   Reconstruction               7-043-002  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box (Ph 4):
12-0481   New Construction             7-046-001  07/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stadium Locker Faciliy - Field House:
19-0959   Alterations                  7-048-001  04/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          OMS Press Box:
19-0960   New Construction             7-051-001  04/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stadium Concession Facility:
19-0961   New Construction             7-052-001  04/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-019             0                  07/26/21   03/29/22    ROMBOUGH ELECTRIC INC               
                                                            GC2-037         2,352                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-043           886                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-045         2,461                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-045         2,461                  01/18/22     /  /      MCK Bldg Assoc Inc                  
                                                            GC2-048        11,016                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-048        11,016                  01/18/22     /  /      MCK Bldg Assoc Inc                  
                                                            GC2-052           515                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            GC2-052           515                  01/18/22     /  /      MCK Bldg Assoc Inc                  
                                                            GC2-061         9,611                  01/18/22   11/01/22    MCK Bldg Assoc Inc                  
                                                            MC2-016             0                  11/02/21   12/13/22    Nairy Mech, LLC                     
 

          Stadium Press Box (HS):
19-0962   New Construction             7-053-001  04/15/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-022             0                  11/08/21   12/12/22    Rombough Electric, Inc.             
                                                            EC2-041         1,994                  12/03/21   09/20/22    Rombough Elec Inc                   
 

          District Wide:
94-1575   Reconstruction               7-999-002  06/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE

PULASKI CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-18-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Lura Sharp Elementary:
90-1311   Reconstruction               0-002-004  05/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0265   Reconstruction               0-002-005  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0350   Reconstruction               0-002-006  03/09/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0556   Reconstruction               0-002-007  06/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            008             8,848               3  06/03/04   03/18/05    Edward Galvin                       
                                                            10              4,237           4,237  06/03/04   06/29/05    Oswego Mech.                        
                                                            11             21,500                  06/03/04   02/24/05    Oswego Mech.                        
                                                            BC-001         16,973                  12/31/04   05/02/05    Barber Corp                         
                                                            BC-20           2,962                  12/31/04   05/02/05    Barber Corp                         
                                                            BC-24          38,425                  12/31/04   06/29/05    Barber Corporation                  
                                                            CSE-008         4,981                  03/21/01   01/14/02    Cornerstone Elec.                   
                                                            CSE-009         6,627                  03/21/01   01/14/02    Cornerstone Elec.                   
                                                            CSE-015        24,222                  07/02/01   02/06/02    Cornerstone Elec.                   
                                                            CSE-016           -77                  06/03/04   07/22/04    Cornerstone Elec.                   
                                                            CSE-17          1,149                  06/03/04   03/18/05    Cornerstone Elec.                   
                                                            OM-008          1,538                  05/08/01   02/06/02    Oswego Mech.                        
                                                            OM-009          3,181                  10/10/01   04/16/02    Oswego Mech.                        
 
05-0517   Reconstruction               0-002-009  05/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2              -543                  02/06/07   03/12/07    Ridley Electric                     
                                                            E-5             2,012                  06/11/08   12/16/08    RIDLEY ELECTRIC COMPANY, INC.       
                                                            E-8             7,280                  03/07/08   08/12/08    Ridley Electric Company, Incorp.    
                                                            GC-1          -15,735                  03/05/07   03/23/07    FAHS Construction                   
                                                            GC-13         -95,368                  03/28/08   08/07/08    FAHS CONSTRUCTION GROUP             
                                                            GC-14             605                  04/25/08   02/06/09    FAHS CONSTRUCTION GROUP             
                                                            GC-16          -8,256                  04/04/08   02/06/09    FAHS CONSTRUCTION GROUP             
                                                            GC-19          31,610                  10/30/08   02/04/09    FAHS CONSTRUCTION GROUP             
                                                            GC-2           54,558                  03/05/07   03/23/07    FAHS Construction                   
                                                            GC-20           2,127                  07/24/09   08/10/09    FAHS CONSTRUCTION GROUP             
                                                            GC-5          -13,276                  07/19/07   08/07/07    FAhs Construction                   
                                                            H -3            6,607                  05/16/08   08/06/08    J & A MECHANCIAL, INC.              
                                                            H-6            -2,157                  10/20/08   05/14/09    J & A MECHANCIAL, INC.              
                                                            P-5               626                  01/31/08   03/03/10    Oswego Mechanical                   
                                                            P-8                 0                  07/11/08   05/11/09    OSWEGO MECHANCIAL, INC.             
                                                            S - 4          19,435                  08/30/07   12/28/07    BARBER CORPORATION, INC.            
                                                            S - 5          18,978                  08/30/07   12/28/07    BARBER CORPORATION, INC.            
                                                            S - 6          19,494                  08/30/07   12/28/07    BARBER CORPORATION, INC.            
                                                            S - 7          19,282                  08/30/07   09/02/07    BARBER CORPORATION, INC.            
                                                            S - 8          19,734                  08/31/07   12/28/07    BARBER CORPORATION, INC.            
                                                            S-1            -2,964                  12/11/06   01/23/07    Barber Corp                         
                                                            S-12            3,408                  04/25/08   02/06/09    BARBER CORPORATION, INC.            
                                                            S-13           64,217                  08/20/08   01/30/09    BARBER CORPORATION, INC.            
                                                            S-15           85,339                  10/30/08   02/04/09    BARBER CORPORATION, INC.            
 
07-1625   Reconstruction               0-002-010  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-11           12,991                  06/22/11   07/15/11    RIDLEY ELECTRIC CO INC              
                                                            E-16            6,528                  05/11/12   10/24/12    RIDLEY ELECTRIC CO INC              
                                                            E-18                0                  05/11/12   10/24/12    RIDLEY ELECTRIC CO INC              
                                                            E-19          -17,810                  05/11/12   10/24/12    RIDLEY ELECTRIC CO INC              
                                                            E-2             9,601                  04/11/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            E-4             4,444                  04/11/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            E-7            16,533                  04/11/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            E-9             4,025                  06/22/11   07/01/11    RIDLEY ELECTRIC CO INC              
                                                            GC-1                0                  12/20/10   12/30/10    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-12           8,999                  04/30/12   10/05/12    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-16               0                  04/24/12   08/29/12    R.J. ORTLIEB CONSTRUCTION COMPANY   
                                                            GC-3           14,597                  12/20/10   12/30/10    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-9           30,767                  04/08/11   04/29/11    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            H-1                 0                  04/07/11   04/29/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            H-2           -41,624                  04/07/11   04/29/11    AIRTECH HEATING & AC SYSTEMS INC    
                                                            H-3           -10,349                  10/03/11   02/23/12    AIRTECH HEATING & AC SYSTEMS INC    
                                                            H-5           -17,873                  10/24/11   02/23/12    AIRTECH HEATING & AC SYSTEMS INC    
                                                            M-1                 0                  10/03/11   11/18/11    GANEM CONSTRUCTION CORP             
                                                            M-2            15,727                  10/03/11   11/18/11    GANEM CONSTRUCTION CORP             
                                                            P-1                 0                  04/04/11   04/21/11    TOWN MECHANICAL INC                 
                                                            P-6                 0                  04/04/11   04/21/11    TOWN MECHANICAL INC                 
                                                            P-7                 0                  10/03/11   02/23/12    TOWN MECHANICAL INC                 
                                                            P-8           -12,780                  11/03/11   02/23/12    TOWN MECHANICAL INC                 
                                                            S-1            41,123                  07/12/10   09/14/10    E-Z PAVING - SEALCOAT               
                                                            S-4                 0                  05/11/11   07/15/11    E-Z PAVING SEALCOAT                 
                                                            WE-1           29,700                  05/20/10   07/30/10    AJAY GLASS CO                       
                                                            WE-3                0                  04/07/11   04/29/11    AJAY GLASS CO                       
                                                            WE-4                0                  10/24/11   12/09/11    AJAY GLASS CO                       
                                                            WE-5          -10,149                  10/24/11   12/09/11    AJAY GLASS CO                       
 
14-0238   Reconstruction               0-002-011  07/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-3            -8,454                  02/10/17   07/17/17    Jag Environmental LLC               
                                                            A-5           -10,832                  05/11/17   06/19/17    Jag Environmental LLC               
                                                            AA A-1              0                  09/15/16   11/09/16    Jag Environmental LLC               
                                                            AA A-2              0                  09/15/16   11/09/16    Jag Environmental LLC               
                                                            AA E-1              0                  09/15/16   11/09/16    MEC Electric Inc.                   
                                                            AA E-3              0                  09/15/16   11/09/16    MEC Electric, Inc.                  
                                                            AA E-4              0                  09/15/16   11/09/16    MEC Electric Inc.                   
                                                            AA G-1              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-10             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-11             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-12             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-13             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-19             0                  11/17/16   01/06/17    Continental Construction            
                                                            AA G-3              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-4              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-5              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-9              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA H-6              0                  09/15/16   11/09/16    Lawman Heating & Cooling, Inc.      
                                                            AA H-7              0                  11/17/16   01/06/17    Lawman Heating & Cooling            
                                                            AA P-3              0                  11/17/16   01/06/17    Hyde-Stone Mechanical Contractors   
                                                            AA TC-1             0                  09/15/16   11/09/16    Siemens Industry Inc.               
                                                            E-10                0                  02/10/17   02/16/17    MEC Electric, Inc.                  
                                                            E-13            8,039                  04/07/17   04/12/17    MEC Electric, Inc.                  
                                                            E-15           14,486                  04/27/17   05/10/17    MEC Electric Inc.                   
                                                            E-16              -67                  05/11/17   06/23/17    MEC Electric, Inc.                  
                                                            E-6           -28,566                  11/17/16   11/25/16    MEC Electric, Inc.                  
                                                            G-25           11,031                  02/10/17   07/17/17    Continental Construction, LLC       
                                                            G-26            8,190                  02/10/17   07/17/17    Continental Construction, LLC       
                                                            G-32             -150                  04/27/17   05/12/17    Contiental Construction, LLC        
                                                            GC-1           18,293                  11/17/16   11/22/16    Continental Construction, LLC       
                                                            GC-2           17,149                  11/17/16   11/22/16    Continental Construction, LLC       
                                                            GC-30          13,787                  04/07/17   05/15/17    Continental Construction, LLC       
                                                            GC-34          -2,945                  05/11/17   06/19/17    Continental Construction, LLC       
                                                            H-11                0                  02/10/17   02/16/17    Lawman Heating & Cooling, Inc.      
                                                            H-14                0                  04/27/17   05/10/17    Lawman Heating & Cooling, Inc.      
                                                            H-15           31,221                  04/27/17   05/10/17    Lawman Heating & Cooling, Inc.      
                                                            H-16                0                  09/15/16   11/09/16    Lawman Heating & Cooling, Inc.      
                                                            H-16           -3,730                  05/11/17   06/23/17    Lawman Heating & Cooling, Inc.      
                                                            S-5                 0                  04/27/17   05/12/17    Cunningham Excavation               
                                                            S-7                 0                  05/11/17   06/19/17    Cunningham Excavation               
                                                            TC-3           20,111                  04/07/17   04/12/17    Siemens Industry, Inc.              
                                                            TC-3            1,938                  05/11/17   06/23/17    Siemens Industry, Inc.              
 
19-0536   Reconstruction               0-002-012  02/05/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          20,620                  10/13/20   02/04/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-02          22,020                  10/13/20   02/04/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-03          10,713                  10/13/20   02/04/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-04          10,400                  10/13/20   02/04/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-05          19,957                  03/11/21   06/29/21    UPSTATE RESTORATION OF NY, IC.      
                                                            GC-06          17,766                  03/11/21   06/29/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-07          24,782                  04/01/21   06/21/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-08          23,783                  04/01/21   06/21/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-09          21,226                  04/22/21   08/05/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-10          23,226                  04/22/21   08/05/21    UPSTATE RESTORATION OF NY, INC.     
                                                            GC-11            -750                  05/11/21   07/09/21    UPSTATE RESTORATION OF NY, INC.     
 
22-2122   Reconstruction               0-002-013  12/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0437   Reconstruction               0-002-014  09/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1947FP Reconstruction               0-002-FP1  06/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0814SC Visual Structural Inspection 0-002-SC1  01/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0238SC Visual Structural Inspection 0-002-SC2  10/06/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0416SC Visual Structural Inspection 0-002-SC3  11/03/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0893SC Visual Structural Inspection 0-002-SC4  12/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1347SC Visual Structural Inspection 0-002-SC5  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School / Middle School:
96-0264   Additions and Alterations    0-007-003  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1398   Reconstruction               0-007-004  05/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1054   Reconstruction               0-007-005  03/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0557   Additions and Alterations    0-007-006  06/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            12             16,900                  06/03/04   03/18/05    Oswego Mech.                        
                                                            13             17,700                  06/03/04   03/18/05    Oswego Mech.                        
                                                            14             12,150                  06/03/04   02/24/05    Oswego Mech.                        
                                                            15             -3,300                  06/03/04   02/24/05    Oswego Mech.                        
                                                            16             14,817          14,817  06/03/04   Disapproved Oswego Mech.                        
                                                            AJM-007        12,790                  06/03/04   02/24/05    AJ Montclair                        
                                                            AJM-008          -340                  06/03/04   07/22/04    AJ Montclair                        
                                                            ARE-004          -220                  06/03/04   07/22/04    Reindeer Environ.                   
                                                            BC-010         25,585                  05/12/05   05/12/05    Barber Corp                         
                                                            BC-014         14,064                  05/08/01   01/14/02    Barber Corp.                        
                                                            BC-018         -4,108                  12/31/04   05/02/05    Barber Corp                         
                                                            BC-019         -7,280                  06/03/04   05/02/05    Barber Corp                         
                                                            BC-21           6,250                  12/31/04   05/02/05    Barber Corp                         
                                                            BC-25          -7,761                  05/12/05   05/16/05    Barber Corp                         
                                                            BC-26           8,367                  03/12/05   05/13/05    Barber Corp                         
                                                            BC22            5,000                  05/12/05   05/12/05    Barber Corp                         
                                                            BC23           -2,015                  12/31/04   05/02/05    Barber Corp                         
                                                            CSE-011        16,533                  03/21/01   01/14/02    Cornerstone Elec.                   
                                                            CSE-013         6,555                  07/02/01   02/06/02    Cornerstone Elec.                   
                                                            CSE-014             0                  07/02/01   02/06/02    Cornerstone Elec.                   
                                                            CSE-014         2,237                  07/02/01   02/06/02    Cornerstone Elec.                   
                                                            CSE-12          2,904                  06/03/04   02/24/05    Cornerstone Elec.                   
                                                            CSE-18         -8,036                  06/03/04   07/22/04    Cornerstone Elec.                   
                                                            EFG-007         4,247                  10/10/01   04/16/02    Edward Galvin                       
                                                            OM-006          2,271                  05/08/01   01/14/02    Oswego Mech.                        
                                                            OM-007         -8,051                  05/08/01   02/06/02    Oswego Mech.                        
                                                            OM-05          18,164                  03/15/01   01/14/03    Oswego Mech.                        
 
05-0518   Additions and Alterations    0-007-008  05/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           -75,800                  01/29/07   10/23/07    Ridley Electric                     
                                                            E-10          -10,200                  11/05/08   04/13/09    RIDLEY ELECTRIC COMPANY, INC.       
                                                            E-11            9,174                  11/05/08   02/25/09    RIDLEY ELECTRIC COMPANY, INC.       
                                                            E-3            -8,082                  06/11/08   12/16/08    RIDLEY ELECTRIC COMPANY, INC.       
                                                            E-4             2,908                  06/11/08   12/16/08    RIDLET ELECTRIC COMPANY, INC.       
                                                            E-6             1,864                  03/28/08   08/07/08    RIDLEY ELECTRIC COMPANY, INC.       
                                                            E-9            12,501                  06/23/08   07/07/09    Ridley Electric                     
                                                            GC-10           9,516                  11/13/07   12/28/07    FAHS Construction Group             
                                                            GC-11           7,446                  08/07/07   08/15/07    FAHS Construction Group             
                                                            GC-12           4,043                  11/30/07   12/28/07    FAHS Construction Group             
                                                            GC-15          11,139                  03/28/08   04/02/08    FAHS CONSTRUCTION GROUP             
                                                            GC-17           6,387                  04/21/08   02/06/09    FAHS CONSTRUCTION GROUP             
                                                            GC-18             871                  10/30/08   02/04/09    FAHS CIONSTRUCTION GROUP            
                                                            GC-3           -7,891                  03/05/07   03/23/07    Fahs Construction                   
                                                            GC-4          -49,025                  07/19/07   08/07/07    Fahs Construction                   
                                                            GC-6          -29,798                  07/19/07   08/07/07    Fahs Construction                   
                                                            GC-7            6,949                  07/19/07   08/07/07    Fahs Construction                   
                                                            GC-8          -47,046                  07/19/07   08/07/07    Fahs Construction                   
                                                            GC-9          -91,000                  07/23/07   08/07/07    Fahs Construction                   
                                                            GC2-01        -45,295                  02/28/08   08/06/09    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC2-02        -32,346                  02/28/08   08/06/09    BEETE & CRING CONSTRUCTION GROUP    
                                                            GC2-03         -3,374                  02/28/08   08/06/09    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC2-04        -24,255                  02/28/08   08/06/09    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC2-05        -44,081                  03/07/08   08/18/08    Bette & Cring Construction Group    
                                                            GC2-06          8,484                  07/11/08   08/26/08    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC2-07          6,920                  08/28/08   08/29/08    BETTE & CRING CONSTRUCTION          
                                                            GC2-08        -15,360                  08/31/09   09/17/09    BETTE & CRING CONSTRUCTION GROUP    
                                                            H - 4          18,108                  04/16/08   08/05/08    J & A MECHANICAL, INC.              
                                                            H-1          -183,283                  06/08/07   03/03/10    J and A Mechanical Inc              
                                                            H-2             9,676                  03/28/08   08/07/08    J & A MECHANICAL, INC.              
                                                            H-5           -27,471                  10/20/08   05/14/09    J & A PLUMBING, INC.                
                                                            P-1            -5,988                  04/16/07   08/15/07    Oswego Mechanical                   
                                                            P-2             4,212                  08/30/07   08/06/08    OSWEGO MECHANICAL, INC.             
                                                            P-3             5,192                  01/31/08   08/06/09    Oswego Mechanical                   
                                                            P-4            17,516                  01/31/08   08/06/09    Oswego Mechanical                   
                                                            P-6             8,215                  01/31/08   08/06/09    Oswego Mechanical                   
                                                            P-7                 0                  07/11/08   05/11/09    OSWEGO MECHANCIAL, INC.             
                                                            S-10           16,012                  04/25/08   02/06/09    BARBER CORPORATION, INC.            
                                                            S-11           25,939                  04/25/08   02/06/09    BARBER CORPORATION, INC.            
                                                            S-14           29,242                  08/20/08   05/11/09    BARBER CORPORATION, INC.            
                                                            S-17           47,167                  04/01/09   08/05/09    BARBER CORPORATION                  
                                                            S-18           13,562                  04/01/09   08/05/09    BARBER CORPORATION INC              
                                                            S-19           -5,443                  08/06/09   08/10/09    Barber Corp.                        
                                                            S-3            14,093                  01/29/07   03/12/07    Barber Corp                         
                                                            S-9            24,945                  01/24/08   08/06/09    BARBER CORPORATION                  
 
07-1626   Reconstruction               0-007-009  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1                 0                  04/11/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            E-10            3,763                  06/22/11   07/01/11    RIDLEY ELECTRIC CO INC              
                                                            E-12            3,453                  06/22/11   07/15/11    RIDLEY ELECTRIC CO INC              
                                                            E-13            1,138                  10/03/11   02/23/12    RIDLEY ELECTRIC CO INC              
                                                            E-14              907                  10/03/11   02/23/12    RIDLEY ELECTRIC CO INC              
                                                            E-15                0                  05/11/12   11/20/12    RIDLEY ELECTRIC CO INC              
                                                            E-17             -191                  05/11/12   10/24/12    RIDLEY ELECTRIC CO INC              
                                                            E-5             3,919                  04/11/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            E-6            43,251                  04/11/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            GC-10          79,106                  04/08/11   04/29/11    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-13          20,966                  06/22/11   07/01/11    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-14           8,447                  04/24/12   08/29/12    RJ ORTLIEB CONSTRUCTION COMPANY INC 
                                                            GC-17            -335                  04/24/12   08/29/12    RJ ORTLIEB CONSTRUCTION COMPANY INC 
                                                            GC-2                0                  12/20/10   12/30/10    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-5           17,726                  12/20/10   12/30/10    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            H-10          -44,986                  05/14/12   01/24/13    AIRTECH HEATING & AC SYSTEMS INC    
                                                            H-4                 0                  10/03/11   02/23/12    AIRTECH HEATING & AC SYSTEMS INC    
                                                            H-6            -2,216                  10/24/11   02/23/12    AIRTECH HEATING & AC SYSTEMS INC    
                                                            H-8            -2,433                  05/14/12   01/24/13    AIRTECH HEATING & AC SYSTEMS INC    
                                                            H-9                 0                  05/14/12   11/20/12    AIRTECH HEATING & AC SYSTEMS INC    
                                                            HC-1                0                  10/24/12   07/03/13    Siemens Industry                    
                                                            HC-2          -14,566                  12/23/13   09/18/13    Siemens Industry                    
                                                            HC-3           -9,431                  10/24/13   09/18/13    Siemens Industry                    
                                                            M-3            22,921                  10/03/11   11/18/11    GANEM CONSTRUCTION CORP             
                                                            P-2                 0                  04/04/11   04/21/11    TOWN MECHANICAL INC                 
                                                            P-4                 0                  04/04/11   04/21/11    TOWN MECHANICAL INC                 
                                                            S-2            -2,800                  07/12/10   09/14/10    E-Z PAVING / SEALCOAT               
                                                            S-5                 0                  05/11/11   07/15/11    E-Z PAVING/SEALCOAT                 
                                                            WE-2                0                  04/07/11   04/29/11    AJAY GLASS CO                       
 
14-0239   Reconstruction               0-007-010  07/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-4            -3,199                  02/10/17   07/17/17    Jag Environmental, LLC              
                                                            AA E-2              0                  09/15/16   09/20/17    MEC Electric Inc.                   
                                                            AA E-5              0                  09/15/16   11/09/16    MEC Electric Inc.                   
                                                            AA E-7              0                  11/17/16   01/06/17    MEC Electric, Inc.                  
                                                            AA G-14             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-15             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-16             0                  09/15/16   09/20/17    Continental Construction LLC        
                                                            AA G-17             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-18             0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-2              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-6              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-7              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA G-8              0                  09/15/16   11/09/16    Continental Construction LLC        
                                                            AA H-1              0                  09/15/16   11/09/16    Lawman Heating & Cooling, Inc.      
                                                            AA H-3              0                  09/15/16   11/09/16    Lawman Heating & Cooling, Inc.      
                                                            AA H-4              0                  09/15/16   11/09/16    Lawman Heating & Cooling, Inc.      
                                                            AA H-5              0                  09/15/16   11/09/16    Lawman Heating & Cooling, Inc.      
                                                            AA H-8         -2,127                  11/17/16   01/06/17    Lawman Heating and Cooling, Inc.    
                                                            AA P-1              0                  09/15/16   09/20/17    Hyde-Stone Mechanical Contractors   
                                                            AA P-2              0                  09/15/16   11/09/16    Hyde-Stone Mechanical Contractors   
                                                            AA S-1              0                  09/15/16   11/09/16    Cunningham Excavation               
                                                            AA S-2              0                  09/15/16   11/09/16    Cunningham Excavation               
                                                            E-11                0                  02/10/17   02/16/17    MEC Electric, Inc.                  
                                                            E-14           13,844                  04/27/17   05/10/17    MEC Electric Inc.                   
                                                            E-2             7,486                  04/07/17   09/20/17    MEC Electri, Inc.                   
                                                            E-9            15,261                  02/10/17   02/16/17    MEC Electric, Inc.                  
                                                            G-27            1,234                  02/10/17   07/17/17    Continental Construction, LLC       
                                                            G-29            7,218                  04/07/17   05/15/17    Continental Construction, LLC       
                                                            G-33           37,935                  04/27/17   05/12/17    Continental Construction, LLC       
                                                            GC-3           19,259                  11/17/16   11/22/16    Continental Construction, LLC       
                                                            GC-31             759                  04/07/17   05/15/17    Continental Construction, LLC       
                                                            GC-4           11,720                  11/17/16   11/22/16    Continental Construction, LLC       
                                                            H-10                0                  02/10/17   02/16/17    Lawman Heating & Cooling, Inc.      
                                                            H-13                0                  04/07/17   04/12/17    Lawman Heating & Cooling, Inc.      
                                                            P-1            27,437                  09/15/16   11/09/16    Hyde-Stone Mechanical Contractors   
                                                            P-5                 0                  02/10/17   02/16/17    Hyde-Stone Mechanical Contractors   
                                                            P-6           -19,755                  05/11/17   06/23/17    Hyde-Stone Mechanical Contractors   
                                                            S-3            -1,494                  02/10/17   07/17/17    Cunningham Excavation               
                                                            S-4                 0                  04/27/17   05/12/17    Cunningham Excavation               
                                                            S-6           -11,732                  05/11/17   06/19/17    Cunningham Excavation               
                                                            S-8            -7,790                  05/11/17   06/19/17    Cunningham Excavation               
 
21-2021   Reconstruction               0-007-011  08/03/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-001         -6,000                  05/01/23   12/28/23    DW & CREW MECHANICAL                
 
23-0302   Reconstruction               0-007-012  10/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2338FP Reconstruction               0-007-FP1  06/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0813SC Visual Structural Inspection 0-007-SC1  01/13/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0239SC Visual Structural Inspection 0-007-SC2  10/06/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0417SC Visual Structural Inspection 0-007-SC3  11/06/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0894SC Visual Structural Inspection 0-007-SC4  12/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1348SC Visual Structural Inspection 0-007-SC5  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage/Transportation Facility:
96-0048   New Construction             5-008-001  08/07/96  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0519   Additions and Alterations    5-008-003  05/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-7               599                  03/07/08   08/12/08    Ridley Electric Company, Incorp.    
                                                            S-16           78,135                  05/18/09   05/19/09    Barber corporation,inc              
                                                            S-2            47,997                  01/29/07   03/12/07    Barber Corporation                  
 
07-1627   Additions and Alterations    5-008-004  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3            -1,610                  04/11/11   06/10/11    RIDLEY ELECTRIC CO INC              
                                                            E-8            11,918                  06/22/11   07/01/11    RIDLEY ELECTRIC CO INC              
                                                            GC-11           3,662                  06/22/11   07/01/11    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-15             737                  04/24/12   08/29/12    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-4            3,926                  12/20/10   12/30/10    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-6           45,473                  12/20/10   12/30/10    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-7            4,991                  04/08/11   04/29/11    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            GC-8            2,932                  04/08/11   04/29/11    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            H-7                 0                  10/24/11   02/23/12    AIRTECH HEATING & AC SYSTEMS INC    
                                                            P-3                 0                  04/04/11   04/21/11    TOWN MECHANICAL INC                 
                                                            P-5                 0                  04/26/11   06/10/11    TOWN MECHANICAL INC                 
                                                            S-3            -4,500                  07/12/10   09/14/10    E-Z PAVING / SEALCOAT               
                                                            S-6                 0                  04/07/11   04/29/11    E-Z PAVING/SEALCOAT                 
                                                            S-7                 0                  10/24/11   12/09/11    E-Z PAVING/SEALCOAT                 
                                                            S-8               -65                  10/24/11   12/09/11    E-Z PAVING/SEALCOAT                 
 
14-0240   Reconstruction               5-008-181  07/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-8                 0                  02/10/17   02/16/17    MEC Electric, Inc.                  
                                                            G-24              330                  02/10/17   07/17/17    Continental Construction, LLC       
                                                            G-28            2,992                  04/07/17   05/15/17    Continental Construction, LLC       
                                                            H-9                 0                  02/10/17   02/16/17    Lawman Heating & Cooling, Inc.      
 

          New Concession Stand:
04-0837   New Construction             7-010-001  04/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
08-1105   New Construction             7-011-001  02/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
98-0023   Reconstruction               7-999-001  09/02/98  NO CHANGE ORDERS ON ELECTRONIC FILE

SANDY CREEK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-19-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
93-0166   Additions and Alterations    0-002-002  10/01/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1209   Additions and Alterations    0-002-004  09/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-11        -10,222                  09/20/04   10/01/04    Joseph Flihan                       
                                                            001-E13         3,250                  12/19/02   01/09/03    NEC Business Network Solutions      
                                                            001-R11         2,213                  10/12/01   01/09/02    RSI Roofing                         
                                                            001-ST11        7,928                  07/26/02   08/28/02    Delhi Steel                         
                                                            001-TC11        4,230                  01/22/03   02/10/03    Invensys Pritchett                  
                                                            002-ACM1        9,093                  12/12/02   01/07/03    USA Remediation                     
                                                            002-BC12       -2,580                  01/14/04   02/18/04    Northern Glass Co.                  
                                                            002-E11        16,730                  02/10/03   02/19/03    New Century Elec.                   
                                                            002-E12         2,384                  04/25/03   05/05/03    New Century Elec.                   
                                                            002-E13         3,103                  07/10/03   07/23/03    NEC Business Network Solutions      
                                                            002-H11        22,575                  01/30/03   02/11/03    J&A Mech.                           
                                                            002-P11         3,829                  10/12/01   01/09/02    Lawman Heating                      
                                                            002-R11       -24,000                  07/26/02   08/28/02    RSI Roofing                         
                                                            002-S11        17,542                  07/31/02   08/16/02    Delaney Const.                      
                                                            002-S21         6,094                  11/25/03   12/05/03    WD Malone Trucking Excavating       
                                                            002-ST11        3,727                  07/26/02   08/28/02    Delhi Steel                         
                                                            002-TC11       -6,800                  04/01/03   04/03/03    Invensys Pritchett                  
                                                            003-BC12       -7,659                  07/16/04   07/21/04    Northern Glass Co                   
                                                            003-E11         7,608                  01/22/03   02/10/03    New Century Elec.                   
                                                            003-E12          -640                  05/17/04   07/15/04    New Century Elec.                   
                                                            003-E13        -1,224                  07/16/04   07/21/04    NEC Business Network Solutions      
                                                            003-H11         2,704                  02/19/03   03/04/03    J&A Mech.                           
                                                            003-R11        -4,200                  06/14/02   07/10/02    RSI Roofing                         
                                                            003-S11         7,266                  07/31/02   08/16/02    Delaney Const.                      
                                                            003-ST11     -131,000                  07/26/02   08/28/02    Delhi Steel                         
                                                            004-ACM        28,519                  04/21/03   05/02/03    USA Remediation                     
                                                            004-BC11        2,740                  07/26/02   08/27/02    Murnane Bldg Contractors            
                                                            004-HC11        8,920                  05/27/03   06/10/03    J&A Mech.                           
                                                            004-R11        -2,278                  11/14/03   11/21/03    RSI Roofing                         
                                                            004-ST11        3,094                  06/14/02   07/10/02    Delhi Steel                         
                                                            005-ACM         6,064                  04/08/03   04/21/03    USA Remediation                     
                                                            005-BC11        3,105                  07/31/02   08/16/02    Murnane Bldg. Contractors           
                                                            005-E11         2,050                  01/22/03   02/10/03    New Century Elec.                   
                                                            005-H11         3,572                  05/27/03   06/10/03    J&A Mech.                           
                                                            005-P11        16,520                  06/14/02   07/10/02    Lawman Heating                      
                                                            005-S11        27,039                  05/16/02   06/04/02    Delaney Const.                      
                                                            005-ST11        5,299                  09/20/02   12/23/02    Delhi Steel                         
                                                            006-BC11        7,820                  07/26/02   08/27/02    Murnane Bldg Contractors            
                                                            006-E11         3,159                  02/19/03   03/04/03    New Century Elec.                   
                                                            006-P11         3,339                  12/19/02   01/09/03    Lawman Heating                      
                                                            006-S11/       11,887                  05/13/02   06/04/02    Delaney Const.                      
                                                            006-St-1        4,602                  02/19/03   03/04/03    Delhi Steel                         
                                                            006ACM11       13,899                  05/27/03   06/10/03    USA Remediation                     
                                                            006H11         13,691                  05/27/03   06/10/03    J&A Mech.                           
                                                            007-BC11       13,340                  07/26/02   08/27/02    Murnane Bldg Contractors            
                                                            007-H11             0                  02/24/04     /  /      J&A Mech.                           
                                                            007-S11        11,943                  05/13/02   06/04/02    Delaney Const.                      
                                                            007-St11         -948                  02/19/03   03/04/03    Delhi Steel                         
                                                            007ACM         19,406                  07/30/03   08/04/03    USA Remediation                     
                                                            008-E11        18,303                  04/25/03   05/05/03    New Century Elec.                   
                                                            008-H11         3,056                  02/24/04   04/12/04    J&A Mech.                           
                                                            008-P110        5,507                  04/01/03   04/03/03    Lawman Heating                      
                                                            008-ST11        9,139                  04/25/03   05/05/03    Delhi Steel                         
                                                            008ACm         11,662                  07/30/03   08/04/03    USA Remediation                     
                                                            009-BC11        6,948                  07/26/02   08/28/02    Murnane Bldg Contractors            
                                                            009-E11         5,182                  04/25/03   05/05/03    New Century Elec.                   
                                                            009-H11         3,075                  02/24/04     /  /      J&A Mech.                           
                                                            009-P11             0                  07/21/03   07/24/03    Lawman Heating                      
                                                            009-S11        15,206                  01/22/03   02/10/03    Delaney Const.                      
                                                            009-ST11          893                  04/25/03   05/05/03    Delhi Steel                         
                                                            009ACM11       17,150                  03/04/04   07/15/04    USA Remediation                     
                                                            010-E11        10,518                  05/27/03   06/10/03    New Century Elec.                   
                                                            010-H11         6,584                  02/24/04     /  /      J&A Mech.                           
                                                            010-P11         7,247                  07/10/03   07/23/03    Lawman Heating                      
                                                            010-S11         3,117                  05/27/03   06/10/03    Delaney Const.                      
                                                            010-ST11        3,453                  11/12/03   11/21/03    Delhi Steel                         
                                                            011-111        17,421                  03/25/04     /  /      J&A Mech.                           
                                                            011-BC11        6,902                  06/14/02   07/10/02    Murnane Bldg Contractors            
                                                            011-E11             0                  05/17/04   07/15/04    New Century Elec.                   
                                                            011-P11         7,609                  11/25/03   12/05/03    Lawman Heating                      
                                                            011-S11         8,729                  07/10/03   07/23/03    Delaney Const.                      
                                                            011-ST11       -1,528                  01/13/04   02/18/04    Delhi Steel                         
                                                            012           -15,000                  08/28/03   09/16/03    Delaney Const.                      
                                                            012-BC11       -5,606                  06/14/02   07/10/02    Murnane Bldg Contractors            
                                                            012-E11        17,863                  07/21/03   07/24/03    New Century Elec.                   
                                                            012-H11         7,380           3,000  09/20/04   10/01/04    J&A Mech.                           
                                                            012-P11         2,893                  11/12/03   11/21/03    Lawman Heating                      
                                                            013             3,918                  08/28/03   09/16/03    Delaney Const.                      
                                                            013-BC11        4,260                  06/14/02   07/10/02    Murnane Bldg Contractors            
                                                            013-E11         5,025                  07/21/03   07/24/03    New Century Elec.                   
                                                            014-BC11        6,699                  09/20/02   12/23/02    Murnane Bldg Contractors            
                                                            014-E11        20,465                  08/28/03   09/16/03    New Century Elec.                   
                                                            015            15,106                  08/28/03   07/15/04    New Century Elec.                   
                                                            015-BC11        4,619                  09/20/02   12/23/02    Murnane Bldg Contractors            
                                                            015-S11         9,829                  06/07/04   07/15/04    Delaney Const.                      
                                                            016-BC11       15,689                  09/20/02   12/23/02    Murnane Bldg Contractors            
                                                            016-S11         1,944                  07/07/04   07/15/04    Delaney Const.                      
                                                            017-BC11       16,707                  09/20/02   12/23/02    Murnane Bldg Contractors            
                                                            017-E11         7,398                  11/14/03   11/21/03    New Century Elec.                   
                                                            018-BC11       16,287                  09/20/02   12/23/02    Murnane Bldg Contractors            
                                                            018-E11         5,843                  12/26/03   01/08/04    New Century Elec.                   
                                                            019-BC11        4,670                  10/07/02   04/03/03    Murnane Bldg Contractors            
                                                            019-E11         6,368                  01/13/04   02/03/04    New Century Elec.                   
                                                            020-E11         8,513                  01/14/04   01/26/04    New Century Elec.                   
                                                            021 E11        10,662                  03/04/04   04/08/04    New Century Elec.                   
                                                            021-BC11       16,104                  02/10/03   07/15/04    Murnane Bldg Contractors            
                                                            022-BC11       16,853                  02/10/03   02/19/03    Murnane Bldg Contractors            
                                                            022-E11        10,950                  04/19/04   04/27/04    New Century Elec.                   
                                                            023-BC11       15,692                  02/10/03   07/15/04    Murnane Bldg Contractors            
                                                            024-BC11       14,216                  02/10/03   02/19/03    Murnane Bldg Contractors            
                                                            025-BC11       13,096                  04/01/03   04/03/03    Murnane Bldg Contractors            
                                                            026-BC11        9,827                  05/02/03   05/21/03    Murnane Bldg Contractors            
                                                            027-BC11       16,257                  05/27/03   06/10/03    Murnane Bldg Contractors            
                                                            028-BC11       28,878                  05/16/03   06/02/03    Murnane Bldg Contractors            
                                                            029-BC11        7,852                  05/02/03   05/21/03    Murnane Bldg Contractors            
                                                            030-BC11       18,466                  05/09/03   05/21/03    Murnane Bldg Contractors            
                                                            031-BC11        9,554                  05/08/03   05/21/03    Murnane Bldg Contractors            
                                                            032-BC11        6,903                  05/27/03   06/10/03    Murnane Bldg Contractors            
                                                            033-BC11       48,643          74,953  05/24/04   07/15/04    Murnane Bldg Contractors            
                                                            035BC11         4,811                  09/22/03   10/03/03    Murnane Bldg Contractors            
                                                            041-BC11       16,375                  10/22/03   11/05/03    Murnane Bldg Contractors            
                                                            042-BC11       12,734                  10/22/03   11/05/03    Murnane Bldg Contractors            
                                                            043-Bc11        1,580                  12/26/03   12/30/03    Murnane Bldg Contractors            
                                                            044-BC11        4,148                  01/13/04   02/18/04    Murnane Bldg Contractors            
                                                            045-BC11        3,782                  03/04/04   03/17/04    Murnane Bldg Contractors            
                                                            046-BC11        7,953                  03/25/04   03/30/04    Murnane Bldg Contractors            
                                                            047BC11        26,321                  03/29/04   04/12/04    Murnane Bldg Contractors            
                                                            048-BC11       31,660                  05/10/04   05/19/04    Murnane Bldg Contractors            
                                                            ACM11          15,873                  01/22/03   02/10/03    USA Remediation                     
                                                            BC-11          26,233                  08/28/03   09/16/03    Murnane Bldg Contractors            
                                                            BC-11          -9,500                  12/14/06   01/19/07    Murnane Building                    
                                                            BC11-037       10,744                  09/25/03   10/03/03    Murnane Bldg Contractors            
                                                            BC11-038       19,936                  09/25/03   10/03/03    Murnane Bldg Contractors            
                                                            BC11-039       19,137                  09/25/03   10/03/03    Murnane Bldg Contractors            
                                                            BC11-040       17,504                  09/25/03   10/03/03    Murnane Bldg Contractors            
                                                            E11            15,518                  09/05/03   09/16/03    New Century Elec.                   
                                                            E11-072         1,338                  02/24/03   03/11/03    New Century Elec.                   
                                                            P11-066         5,994                  02/24/03   03/11/03    Lawman Heating                      
                                                            P11/009         3,829                  01/30/02   02/07/02    Lawman Heating                      
                                                            S-11           11,505                  08/28/03   09/16/03    Delaney Const.                      
                                                            TC11          -13,964                  09/11/06   10/24/06    Pritchett Controls                  
 
97-1482   Reconstruction               0-002-005  05/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0813   Reconstruction               0-002-006  06/04/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-BC21        3,788                  04/01/03   04/18/03    BF Yenny Const.                     
                                                            001-BC22      -18,383                  12/24/04   01/03/05    Northern Glass Co                   
                                                            001-R21         4,464                  12/12/05   08/08/06    PTl Roofing                         
                                                            002-BC21        3,640                  04/01/03   04/18/03    BF Yenny Const.                     
                                                            003-BC21        2,970                  04/01/03   04/18/03    BF Yenny Const.                     
                                                            003-S21       -14,801                  11/04/04   11/19/04    WD Malone Trucking                  
                                                            004-BC21       12,892                  04/16/03   05/23/03    BF Yenny Const.                     
                                                            005-BC21        2,598                  07/10/03   08/28/03    BF Yenny Const.                     
                                                            008-BC21       22,550                  10/22/03   11/04/03    BF Yenny Const.                     
                                                            009-BC21        4,900                  09/09/03   10/14/03    BF Yenny Const.                     
                                                            010 BC21        9,649                  10/09/03   10/14/03    BF Yenny Const.                     
                                                            011-BC21        8,618                  11/12/03   11/21/03    BF Yenny Const.                     
                                                            012-BC21        5,296                  11/25/03   12/01/03    BF Yenny Const.                     
                                                            013-BC21        5,663                  11/25/03   12/04/03    BF Yenny Const.                     
                                                            014-BC21        6,892                  12/26/03   12/30/03    BF Yenny Const.                     
                                                            BC-21          11,499                  09/04/03   09/16/03    BF Yenny Const.                     
                                                            BC-21           8,135                  09/04/03   09/16/03    BF Yenny Const.                     
                                                            S21-067       -12,700                  02/24/03   03/13/03    WD Malone Trucking                  
 
08-0405   Reconstruction               0-002-007  03/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          1,585                  10/22/09   11/25/09    KNAPP ELECTRIC INC                  
                                                            EC-002         36,858                  10/22/09   12/01/09    KNAPP ELECTRIC INC                  
                                                            EC-003          1,103                  03/03/10   04/30/10    KNAPP ELECTRIC INC                  
                                                            EC-004          2,023                  03/03/10   04/30/10    KNAPP ELECTRIC INC                  
                                                            EC-005         45,085                  04/21/10   07/23/10    KNAPP ELECTRIC INC                  
                                                            EC-006         10,521                  04/21/10     /  /      KNAPP ELECTRIC INC                  
                                                            GC-001          1,171                  10/22/09   11/25/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-002          1,360                  10/22/09   11/25/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-003            611                  10/22/09   11/25/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-004          7,140                  10/22/09   11/25/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-005          6,465                  10/22/09   11/25/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-006          7,201                  10/22/09   11/25/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-007          2,373                  10/22/09   11/25/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-008          8,219                  11/09/09   01/06/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-009          3,354                  03/03/10   04/30/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-010         10,145                  03/03/10   04/30/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-011          5,978                  04/21/10   07/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-012            843                  04/21/10   07/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-013           -886                  09/09/10   09/28/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-014            265                  09/09/10   09/28/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-015 R       -5,581                  04/22/11   05/20/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            HVAC-001         -920                  01/04/10   02/12/10    ANGELO CHIODO HEAT A/C REFRIGERATION
                                                            HVAC-002          808                  01/04/10   02/12/10    ANGELO CHIODO HEAT A/C REFRIGERATION
                                                            HVAC-003        1,287                  01/04/10     /  /      ANGELO CHIODO HEAT A/C REFRIGERATION
                                                            HVAC-004          464                  01/04/10   02/12/10    ANGELO CHIODO HEAT A/C REFRIGERATION
                                                            HVAC-005        2,734                  01/04/10     /  /      ANGELO CHIODO HEAT A/C REFRIGERATION
                                                            HVAC-006      -25,000                  01/04/10   02/12/10    ANGELO CHIODO HEAT A/C REFRIGERATION
                                                            HVAC-007        9,069                  09/20/10   09/29/10    ANGELO CHIODO HEATING AND A/C LLC   
                                                            PC-001          2,701                  11/09/09   01/06/10    C&S TECHNICAL RESOURCES INCC        
                                                            PC-002          2,636                  11/09/09   01/06/10    C&S TECHNICAL RESOURCES INCC        
                                                            PC-003          4,607                  03/03/10   04/30/10    C&S TECHNICAL RESOURCES INC         
                                                            PC-004          3,984                  08/19/10   10/29/10    C&S TECHNICAL RESOURCES INC         
                                                            SC-001          1,360                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-002            187                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-003         30,991                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-004          3,105                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-005          6,979                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-006          2,976                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-007         23,778                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-008          3,897                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-009          1,004                  11/12/09   12/17/09    BARBER CORPORATION                  
                                                            SC-010         16,398                  11/12/09   12/17/09    Barber Corporation                  
                                                            SC-011            583                  04/22/11   05/13/11    BARBER CORPORATION                  
                                                            SC-012         24,489                  04/22/11   05/13/11    BARBER CORPORATION                  
                                                            SC-013          6,442                  04/22/11   05/13/11    BARBER CORPORATION                  
                                                            SC-014         18,119                  04/22/11   05/13/11    BARBER CORPORATION                  
                                                            SC-015          9,650           9,650  04/22/11   05/13/11    BARBER CORPORATION                  
                                                            SC-016         22,476                  04/22/11   05/13/11    BARBER CORPORATION                  
                                                            SC-017         16,703                  04/22/11   05/13/11    BARBER CORPORATION                  
                                                            SC-018          2,850                  04/22/11   05/20/11    BARBER CORPORATION                  
                                                            SC-019          1,195                  04/22/11   05/20/11    BARBER CORPORATION                  
                                                            SC-020           -450                  04/22/11   05/20/11    BARBER CORPORATION                  
                                                            SC-021          5,330                  04/22/11   05/20/11    BARBER CORPORATION                  
                                                            SC-022          5,042                  04/22/11   09/26/12    BARBER CORPORATION                  
                                                            SC-023         29,994                  04/22/11   05/20/11    BARBER CORPORATION                  
 
10-1328   Reconstruction               0-002-008  05/20/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0498   Reconstruction               0-002-009  08/08/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0317   Reconstruction               0-002-010  03/12/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0595   Reconstruction               0-002-011  04/27/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1656   Reconstruction               0-002-012  10/24/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1427   Reconstruction               0-002-013  04/27/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          12,969                  10/22/18   11/09/18    ROMBOUGH ELECTRIC INC               
                                                            EC-02           2,683                  10/22/18   11/09/18    ROMBOUGH ELECTRIC INC               
                                                            EC-03             263                  10/22/18   11/09/18    ROMBOUGH ELECTRICA INC              
                                                            GC-01           7,994                  11/07/18   01/03/19    BACON & SEILER, CONSTRUCTORS        
                                                            SC-01          12,969                  11/07/18   01/03/19    EDGE CIVIL CORP.                    
                                                            SC-02          13,518                  11/07/18   01/03/19    EDGE CIVIL CORP.                    
                                                            SC-03          11,510                  11/07/18   01/03/19    EDGE CIVIL CORP.                    
 
17-2000   Reconstruction               0-002-014  06/20/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0412   Reconstruction               0-002-015  12/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-01        -3,000                  06/03/19   06/04/19    ONTARIO HVAC SOLUTIONS, INC.        
 
18-1138   Reconstruction               0-002-016  02/27/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-01             0                  02/24/20   06/24/20    S&L ELECTRIC, INC.                  
                                                            AAHC-01             0                  02/24/20   06/24/20    J.E. SHEEHAN                        
                                                            EC-01           9,763                  01/15/20   02/14/20    S&L ELECTRIC, INC.                  
                                                            GC-01          -2,925                  06/10/20   07/07/20    UPSTATE CONSTRUCTION                
                                                            GC-02         -20,026                  06/10/20   07/07/20    UPSTATE CONSTRUCTION                
                                                            HC-02          -8,997                  06/10/20   07/09/20    J.E. SHEEHAN                        
 
19-1048   Reconstruction               0-002-017  05/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA EC-02            0                  05/14/21   08/16/21    WEYDMAN ELECTRIC                    
                                                            AAGC-04             0                  04/22/21   05/18/21    DIPASQUALE CONSTRUCTION CORP.       
                                                            AAPC-01             0                  01/12/21   03/12/21    J&A MECHANICAL CONTRACTORS          
                                                            AASC-01             0                  01/12/21   06/15/21    PARAGON ENVIROMENTAL                
                                                            EC-01          11,135                  09/28/20   11/09/20    WEYDMAN ELECTRIC                    
                                                            EC-06               0                  01/14/22   01/31/23    Weydman Elec                        
                                                            EC-10               0                  06/21/22   04/27/23    Weydman Elec                        
                                                            GC-01            -851                  02/09/21   03/23/21    DIPASQUALE CONSTRUCTION CORP.       
                                                            GC-06               0                  09/02/21   05/11/22    DIPASQUALE CONTRUCTION CORP         
                                                            GC-08               0                  09/02/21   05/11/22    DIPASQUALE CONSTRUCTION CORP        
                                                            GC-09            -950                  10/05/21   12/02/22    DiPasquale Construction Corp        
                                                            GC-09            -950                  10/05/21     /  /      Dipasquale Const Corp               
                                                            GC-11               0                  02/08/22   02/13/23    DiPasquale Const Corp               
                                                            MC-01               0                  09/02/21   05/24/22    J&A MECHANICAL CONTRACTORS          
                                                            MC-02          -7,825                  09/02/21   05/24/22    J&L MECHANICAL CONTRACTORS          
                                                            MC-04               0                  11/18/21   12/15/22    J&A Mech Contrs                     
                                                            MC-05               0                  02/25/22   12/20/22    J&A Mech Contrs                     
                                                            MC-06               0                  05/04/22   02/14/23    J&A Mech Contrs                     
                                                            MC-08         -54,129                  07/18/22   03/23/23    J&A Mech Contrs                     
                                                            PC-06          -4,808                  07/18/22   03/23/23    J&A Mech Contrs                     
                                                            RC-01               0                  02/09/21   03/23/21    RSI ROOFING, INC.                   
                                                            RC-02         -97,917                  12/14/21   01/09/23    RSI Roofing Incorp                  
                                                            SC-09          16,296                  09/02/21   05/24/22    PARAGON ENVIRONMENTAL               
                                                            SC-10         -11,589                  09/02/21   05/24/22    PARAGON ENVIROMENTAL                
                                                            SC-11           6,308                  09/02/21   05/24/22    PARAGON ENVIROMENTAL                
 
19-0927   Reconstruction               0-002-018  01/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1622   Reconstruction               0-002-019  05/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1029   Reconstruction               0-002-020  02/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1670   Reconstruction               0-002-021  07/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  05/09/23   12/22/23    BLACK HORSE GROUP                   
                                                            GC-02          29,149                  05/09/23   12/22/23    BLACK HORSE GROUP                   
                                                            GC-03          16,293                  05/09/23   12/22/23    BLACK HORSE GROUP                   
                                                            GC-04               0                  08/21/23     /  /      BLACK HORSE GROUP                   
                                                            GC-05               0                  08/21/23     /  /      BLACK HORSE GROUP                   
                                                            GC-06          17,349                  08/21/23     /  /      BLACK HORSE GROUP                   
                                                            SC-01               0                  09/19/23     /  /      SHAWN MALONE EXCAVATING             
 
22-0168   Reconstruction               0-002-022  12/07/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -15,725                  12/23/22   12/12/23    Zerodraft of CNY Inc                
 
23-0539   Reconstruction               0-002-023  10/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Orwell Village Sch(BLDG SOLD):
97-0090   Reconstruction               0-003-001  08/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Storage Maint.:
97-0557   Reconstruction               5-001-001  12/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0071   Reconstruction               5-001-002  09/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            013-P11         1,037                  11/12/03   11/21/03    Lawman Heating                      
                                                            014-P11         7,595                  01/13/04   02/03/04    Lawman Heating                      
                                                            015-P11         1,921                  03/04/04   03/25/04    Lawman Heating                      
                                                            016-P11         8,218                  05/17/04   07/15/04    Lawman Heating                      
                                                            036BC-11        2,206                  09/22/03   10/03/03    Murnane Bldg Contractors            
 
15-0567   Reconstruction               5-001-003  10/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            RC-001         -4,000                  06/28/16   07/07/16    WCA Roofing & Sheet Metal Co., Inc. 
 
19-1049   Reconstruction               5-001-004  05/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-08               0                  01/14/22   01/31/23    Weydman Elec                        
                                                            EC-09          24,708                  03/17/22   04/04/23    Weydman Elec                        
                                                            EC-11               0                  06/21/22   04/27/23    Weydman Elec                        
                                                            EC-12          25,174                  06/21/22   04/27/23    Weydman Elec                        
                                                            EC-14          24,315                  06/21/22   04/27/23    Weydman Elec                        
                                                            EC-15          18,534                  12/23/22   12/11/23    Weydman Elec                        
                                                            FC-01         -11,751                  10/22/21   12/06/22    LaValley Brothers                   
                                                            GC-12               0                  02/25/22   02/17/23    Dipasquale Const Corp               
                                                            GC-13          16,318                  02/25/22   02/17/23    DiPasquale Const Corp               
                                                            GC-14          13,913                  05/18/22   04/03/23    Dipasquale Const Corp               
                                                            GC-16           6,161                  05/18/22   04/03/23    DiPasquale Const Corp               
                                                            GC-17         -13,000                  10/03/22   12/15/23    D'Pasquale Const Corp               
                                                            GC-18           5,454                  10/03/22   12/15/23    DiPasquale Const Corp               
                                                            SC-07           5,672                  08/10/21   04/21/22    PARAGON ENVIRONMENTAL               
                                                            SSC-14         11,365                  02/25/22   12/20/22    Paragon Environ                     
 

          New Bus Maintenance Garage:
19-1050   New Construction             5-016-001  05/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA EC-01            0                  05/14/21   08/16/21    WEYDMAN ELECTRIC                    
                                                            AA EC-03            0                  05/14/21   08/16/21    WEYDMAN ELECTRIC                    
                                                            AAPC-02             0                  04/22/21   06/30/21    J&A MECHANICAL CONTRACTORS          
                                                            AASC-03             0                  04/22/21   05/18/21    PARAGON ENVIROMENTAL                
                                                            EC-02         -11,940                  12/29/20   03/03/21    WEYDMAN ELECTRIC                    
                                                            EC-05               0                  09/02/21   05/24/22    WEYDMAN ELECTRIC                    
                                                            EC-07               0                  01/14/22   01/31/23    Weydman Elec                        
                                                            EC-13           4,471                  06/21/22   04/27/23    Weydman Elec                        
                                                            FC-02         -20,858                  06/21/22   04/27/23    LaValley Brothers                   
                                                            GC-02               0                  02/09/21   03/23/21    DIPASQUALE CONSTRUCTION CORP.       
                                                            GC-03               0                  02/09/21   03/23/21    DIPASQUALE CONSTRUCTION CORP.       
                                                            GC-05               0                  09/02/21   05/11/22    DIPASQUALE CONSTRUCTION CORP        
                                                            GC-07               0                  09/02/21   05/11/22    DIPASQUALE CONSTRUCTION CORP        
                                                            GC-10               0                  02/08/22   02/13/23    DiPasquale Const Corp               
                                                            GC-15           2,253                  05/18/22   04/03/23    DiPasquale Const Corp               
                                                            MC-03               0                  09/24/21   11/30/22    J&A Mech Contractors                
                                                            MC-07          -6,248                  07/18/22   03/23/23    J&A Mech Contrs                     
                                                            PC-03               0                  09/02/21   05/24/22    J&A MECHANICAL CONTRACTORS          
                                                            PC-04               0                  09/02/21   05/24/22    J&A MECHANICAL CONTRACTORS          
                                                            PC-05               0                  12/02/21   12/16/22    J&A Mech Contr                      
                                                            SC-03          31,104                  08/10/21   04/21/22    PARAGON ENVIROMENTAL                
                                                            SC-04               0                  08/10/21   04/21/22    PARAGON ENVIROMENTAL                
                                                            SC-05          34,765                  08/10/21   04/21/22    PARAGON ENVIROMENTAL                
                                                            SC-06               0                  08/10/21   04/21/22    PARAGON ENVIROMENTAL                
                                                            SC-08             990                  08/10/21   04/21/22    PARGON ENVIROMENTAL                 
                                                            SC-12           2,764                  09/02/21   05/24/22    PARAGON ENVIRONMENTAL               
                                                            SC-13          -8,212                  09/24/21   11/30/22    Paragon Environmantal               
                                                            SC-15           1,820                  02/25/22   12/20/22    Paragon Environmental               
 

          Press Box:
00-0814   New Construction             7-011-001  06/04/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
18-1139   Reconstruction               7-999-001  02/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0590EP Energy Project               7-999-E01  01/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE

PHOENIX CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-20-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Elm Street School:
93-0237   Additions and Alterations    0-002-004  11/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1537   Reconstruction               0-002-005  06/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1223   Reconstruction               0-002-007  04/25/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               9,353                  05/04/01   01/30/02    Shue Roofing                        
                                                            2              26,620                  05/04/01   01/30/02    Shue Roofing                        
 
00-1430   Reconstruction               0-002-008  03/22/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1048   Reconstruction               0-002-009  09/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-007         7,415                  02/17/09   05/06/09    Marki's Inc                         
                                                            101-014        18,225                  10/11/11   01/18/12    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            103-015         7,075                  12/09/09   02/04/10    ACCURATE ACOUSTICAL INC             
                                                            107-011         6,227                  10/11/11   09/28/12    PATRICIA ELECTRIC, INC.             
                                                            107-016         2,721                  02/17/09   06/23/09    PATRICIA ELECTRIC, INC.             
                                                            107-022             0                  02/17/09   06/10/09    PATRICIA ELECTRIC, INC.             
 
08-0579   Reconstruction               0-002-010  05/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            201-013           655                  02/08/11   05/04/11    OP-TECH ENVIRONMENTAL               
                                                            201-015        -1,957                  04/13/11   05/10/11    OP-TECH ENVIRONMENTAL               
                                                            202-002         3,263                  07/16/10   08/23/10    LAN-CO COMPANIES INC                
                                                            203-005         9,799                  07/26/10   09/07/10    BOULEY ASSOCIATES INC               
                                                            203-007         1,612                  07/26/10   09/07/10    BOULEY ASSOCIATES INC               
                                                            203-012         9,741                  07/26/10   09/13/10    BOULEY ASOCIATES INC                
                                                            203-014         1,104                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-016         1,474                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-019        14,280                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-022         4,784                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-026         6,443                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-030        42,923                  02/10/11   05/04/11    BOULEY ASSOCIATES INC               
                                                            203-031         8,824                  02/10/11   03/03/11    BOULEY ASSOCIATES INC               
                                                            203-036         3,734                  04/13/11   05/10/11    BOULEY ASSOCIATES INC               
                                                            203-039           -60                  04/13/11   05/10/11    BOULEY ASSOCIATES INC               
                                                            204-003         6,242                  12/01/10   01/06/11    AIRTECH HEATING AND A/C SYSTEMS INC 
                                                            204-006         1,380                  04/13/11   05/10/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            205-005         5,836                  04/13/11   05/10/11    GREEN PLUMBING INC                  
                                                            205-007        -1,336                  12/09/11   05/08/12    GREEN PLUMBING INC                  
                                                            206-001         2,991                  07/26/10   09/13/10    EDGELINE ELECTRIC CORP              
                                                            206-002         9,516                  07/26/10   09/13/10    EDGELINE ELECTRIC CORP              
                                                            206-005         2,900                  07/26/10   09/13/10    EDGELINE ELECTRIC CORP              
                                                            206-008         3,339                  07/16/10   08/23/10    EDGELINE ELECTRIC CORP              
                                                            206-011        26,275                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-018         2,062                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-022        17,309                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-025         4,580                  02/08/11   05/04/11    EDGELINE ELECTRIC CORP              
                                                            206-029         6,104                  02/08/11   05/04/11    EDGELINE ELECTRIC CORP              
 
13-0054   Reconstruction               0-002-011  01/31/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            300-02              0                  10/14/14   10/20/14    Sands Brothers Roofing              
                                                            4-004           9,140                  10/27/14   11/03/14    HMI Mechanical Sytems               
                                                            5-002           2,518                  09/12/14   09/24/14    Ridley Electric Co. Inc.            
                                                            500-02              0                  12/26/14   01/12/15    Ridley Electric                     
 
17-0210   Reconstruction               0-002-012  05/10/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-07        -222,761                  11/19/20   02/22/21    RSI ROOFING, INC.                   
                                                            SC-01         -15,508                  11/19/20   02/22/21    LANDMARK ENTERPRISES                
                                                            SC-02        -200,000                  11/19/20   02/22/21    LANDMARK ENTERPRISES                
 
17-2048   Reconstruction               0-002-013  09/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-16               0                  11/10/20   01/27/21    S&L ELECTRIC, INC.                  
                                                            EC-18               0                  01/22/21   04/09/21    S&L ELETRIC, INC.                   
                                                            EC-20               0                  02/26/21   04/15/21    S&L ELECTRIC, INC.                  
                                                            EC-22               0                  04/28/21   08/02/21    S&L ELECTRIC, INC.                  
                                                            GC-01          34,259                  07/02/19   11/08/19    BETTE & CRING, LLC                  
                                                            GC-02          32,557                  07/02/19   11/05/19    BETTE & CRING, LLC                  
                                                            GC-57           1,739                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-59          21,300                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-63           1,779                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-66           6,770                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-72           7,877                  03/11/21   05/04/21    BETTE & CRING, LLC                  
                                                            GC-73           9,285                  04/28/21   05/19/21    BETTE & CRING, LLC                  
                                                            GC-74           8,421                  04/28/21   05/19/21    BETTE & CRING, LLC                  
                                                            GC-75           7,595                  04/28/21   05/19/21    BETTE & CRING, LLC                  
                                                            GC-82           9,999                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-84           3,532                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-86           1,677                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-94           5,753                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            MC-15               0                  10/18/21     /  /      J&A Mech Contract, Inc              
                                                            MC-16               0                  10/18/21   12/05/22    J&A Mechanical Contractors          
                                                            PC-12           7,840                  07/15/20   09/02/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-13           4,063                  07/15/20   09/02/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-14           5,764                  07/15/20   09/02/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-16             250                  08/21/20   10/29/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-17          16,887                  09/15/20   11/25/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-18           2,620                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            PC-20           4,062                  11/25/20   02/05/21    SIRACUSA MECHANICAL, INC.           
                                                            PC-21           1,411                  02/26/21   04/15/21    SIRACUSA MECHANICAL, INC.           
                                                            PC-22           2,093                  02/26/21   04/15/21    SIRACUSA MECHANICAL, INC.           
                                                            PC-23           5,215                  07/15/21   12/14/21    Siracusa Mechanical Inc             
                                                            PC-23           5,215                  09/16/21   06/16/22    Siracusa mech, Inc                  
                                                            PC-24           4,588                  08/02/21   04/13/22    SIRACUSA MECH, INC                  
                                                            PC-25           1,821                  11/16/21   12/12/22    Siracusa Mech Inc                   
                                                            RC-04               0                  08/21/20   10/30/20    RSI ROOFING, INC.                   
                                                            RC-07        -222,761                  11/10/20   02/10/21    RSI ROOFING, INC.                   
 
19-1184   Reconstruction               0-002-014  03/05/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1816FP Reconstruction               0-002-FP1  05/22/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Birdlebough High School:
97-1013   Additions and Alterations    0-003-007  04/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1222   Reconstruction               0-003-008  04/25/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1431   Reconstruction               0-003-009  03/22/02  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0699   Reconstruction               0-003-010  04/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1049   Reconstruction               0-003-011  09/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-013         7,506                  12/09/09   02/01/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-020        13,540                  06/22/10   08/17/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-021        20,310                  06/22/10   08/17/10    MARKI'S INC DBA LANDMARK ENTERPRISES
                                                            101-024           982                  06/22/10   01/05/11    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-025        -2,220                  04/13/11   05/10/11    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            102-039        13,346                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-044         1,053                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-051         3,206                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-054         6,305                  06/22/10   08/17/10    BETTE & CRING LLC                   
                                                            102-057         5,769                  06/22/10   08/17/10    BETTE & CRING LLC                   
                                                            102-059         4,095                  06/22/10   08/17/10    BETTE & CRING LLC                   
                                                            102-067          -220                  11/19/10   11/26/10    BETTE & CRING LLC                   
                                                            102-069        12,666                  11/19/10   11/26/10    BETTE & CRING LLC                   
                                                            103-021         1,112                  07/26/10   11/30/10    ACCURATE ACOUSTICAL INC             
                                                            103-024           263                  10/11/11   01/18/12    ACCURATE ACOUSTICAL INC             
                                                            103-026           367                  11/19/10   11/26/10    ACCURATE ACOUSTICAL INC             
                                                            103-027           259                  11/19/10   11/26/10    ACCURATE ACOUSTICAL INC             
                                                            103-028         1,434                  11/19/10   11/26/10    ACCURAGE ACCOUSTICAL INC            
                                                            104-002        -3,582                  12/05/08   01/22/09    APPLE ROOFING CORP.                 
                                                            104-010         4,005                  07/26/10   11/30/10    APPLE ROOFING CORP                  
                                                            104-017         1,172                  11/19/10   11/26/10    APPLE ROOFING CORP                  
                                                            105-009         3,529                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            106-002        -3,600                  12/05/08   03/25/09    BELLUCCI ENTERPRISES INC.           
                                                            106-016           307                  10/11/11   08/06/12    BELLUCCI ENTERPRISES INC            
                                                            106-017        38,490                  07/26/10   11/30/10    BELLUCCI ENTERPRISES INC            
                                                            106-019         2,990                  07/26/10   11/30/10    BELLUCCI ENTERPRISES INC            
                                                            106-021         2,418                  11/19/10   11/26/10    BELLUCCI ENTERPRISES INC            
                                                            106-023           739                  11/19/10   11/26/10    BELLUCCI ENTERPRISES INC            
                                                            107-010        -9,700                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
                                                            107-020         5,742                  02/17/09   06/23/09    PATRICIA ELECTRIC, INC.             
                                                            107-025           714                  05/20/09   10/07/09    PATRICIA ELECTRIC INC               
                                                            107-045         5,153                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-046        10,907                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-047        26,669                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-048         1,343                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-058         1,721                  11/22/10   12/02/10    PATRICIA ELECTRIC INC               
 
08-0580   Reconstruction               0-003-012  05/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            107-041        14,880                  07/26/10   09/13/10    PATRICIA ELECTRIC INC               
                                                            201-001        31,670                  07/16/10   08/23/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-002         3,637                  07/16/10   08/23/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-004         2,065                  07/16/10   08/23/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-007         1,172                  07/16/10   08/23/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-009         3,944                  12/01/10   01/06/11    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-012         3,295                  02/08/11   05/04/11    OP-TECH ENVIRONMENTAL               
                                                            201-014        -2,987                  04/13/11   05/10/11    OP-TECH ENVIRONMENTAL               
                                                            202-001        30,380                  11/03/09   12/04/09    LAN-CO COMPANIES INC                
                                                            202-003         8,800                  07/16/10   08/23/10    LAN-CO COMPANIES INC                
                                                            202-004         7,550                  07/16/10   08/23/10    LAN-CO COMPANIES INC                
                                                            202-008          -682                  07/16/10   08/23/10    LAN-CO COMPANIES INC                
                                                            202-009        10,030                  12/01/10   01/06/11    LAN-CO COMPANIES INC                
                                                            203-001        11,342                  11/03/09   12/04/09    BOULEY ASSOCIATES INC               
                                                            203-002        17,388                  11/03/09   12/04/09    BOULEY ASSOCIATES INC               
                                                            203-003        13,963                  07/26/10   09/07/10    BOULEY ASSOCIATES INC               
                                                            203-004          -922                  07/26/10   09/07/10    BOULEY ASSOCIATES INC               
                                                            203-006         5,953                  07/26/10   09/07/10    BOULEY ASSOCIATES INC               
                                                            203-008        13,544                  07/26/10   09/07/10    BOULEY ASSOCIATES INC               
                                                            203-010         9,315                  07/26/10   09/13/10    BOULEY ASSOCIATES INC               
                                                            203-011        15,308                  07/26/10   09/13/10    BOULEY ASSOCIATES INC               
                                                            203-015         9,143                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-017         2,289                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-020         3,534                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-024         4,694                  12/01/10   01/20/11    BOULEY ASSOCIATES INC               
                                                            203-025        15,720                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-029        11,915                  02/10/11   05/04/11    BOULEY ASSOCIATES INC               
                                                            203-034         1,155                  02/10/11   03/03/11    BOULEY ASSOCIATES INC               
                                                            203-037        -9,710                  04/13/11   05/10/11    BOULEY ASSOCIATES INC               
                                                            204-004        11,122                  02/08/11   05/04/11    AIRTECH HEATING AND A-C SYSTEMS INC 
                                                            204-007         4,907                  04/13/11   05/10/11    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            205-003           912                  12/01/10   01/06/11    GREEN PLUMBING INC                  
                                                            205-004        16,026                  12/01/10   01/06/11    GREEN PLUMBING INC                  
                                                            206-003         4,448                  07/26/10   09/13/10    EDGELINE ELECTRIC CORP              
                                                            206-007         8,666                  07/26/10   09/07/10    EDGELINE ELECTRIC CORP              
                                                            206-009         7,525                  07/26/10   09/07/10    EDGELINE ELECTRIC CORP              
                                                            206-010         1,337                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-013        19,557                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-014         4,721                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-015         3,380                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-016        41,049                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-020        11,039                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-021         3,084                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-023         2,764                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-026        33,868                  02/08/11   05/13/11    EDGELINE ELECTRIC CORP              
                                                            206-027         1,449                  02/08/11   05/04/11    EDGELINE ELECTRIC CORP              
                                                            206-031         2,220                  04/13/11   05/10/11    EDGELINE ELECTRIC CORP              
 
08-0583   Reconstruction               0-003-013  11/07/08  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0055   Reconstruction               0-003-014  01/31/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1-001           4,463                  11/04/14   12/01/14    Davis Wallbridge                    
                                                            1-002          71,000                  11/04/14   12/01/14    Davis Wallbridge                    
                                                            1-003          -9,600                  12/26/14     /  /      Davis Wallbridge                    
                                                            1-004           1,578                  12/26/14   01/12/15    Davis Wallbridge                    
                                                            100-02              0                  01/28/15   02/03/15    Davis Wallbridge, Inc.              
                                                            2-001          -8,023                  11/20/14   12/01/14    James & Son Construction Co., Inc.  
                                                            2-002            -640                  11/21/14   12/18/14    James & Son Construction Co. Inc.   
                                                            2-003          -1,150                  06/10/15   08/05/15    James & Son Construction Co. Inc.   
                                                            200-01              0                  11/20/14   11/26/14    James & Son Construction Co., Inc.  
                                                            200-01              0                  01/28/15   02/03/15    James & Son Construction Co.        
                                                            200-01              0                  01/28/15     /  /      James & Son Construction Co.        
                                                            3-001         -11,650                  10/14/14   10/20/14    Sands Brothers Roofing              
                                                            3-002            -560                  02/19/15   03/09/15    Sands Brothers Roofing              
                                                            4-003          -1,613                  10/14/14   10/20/14    HMI Mechanical Systems              
                                                            4-005          -5,062                  11/04/14   11/01/14    HMI Mechanical Systems              
                                                            5-001          12,485                  09/12/14   09/24/14    Ridley Electric Co. Inc.            
                                                            5-004          -2,564                  12/26/14   01/12/15    Ridley Electric Co. Inc.            
                                                            5-005           5,505                  11/21/14   12/18/14    Ridley Electric Co. Inc.            
                                                            500-03              0                  12/26/14   01/12/15    Ridley Electric                     
 
12-1131   Reconstruction               0-003-015  05/14/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-01              0                  01/28/15   02/03/15    Davis Wallbridge, Inc.              
                                                            300-04              0                  10/14/14   10/16/14    Sands Brothers Roofing              
                                                            500-001             0                  12/26/14   01/07/15    Ridley Electric                     
 
17-0211   Reconstruction               0-003-016  05/10/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2049   Additions and Alterations    0-003-017  09/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -31,579                  07/02/19   07/08/19    S&L ELECTRIC, INC.                  
                                                            EC-02               0                  07/02/19   07/08/19    S&L ELECTRIC, INC.                  
                                                            EC-025              0                  04/28/21   08/02/21    S&L ELECTRIC, INC.                  
                                                            EC-03               0                  07/02/19   07/08/19    S&L ELECTRIC, INC.                  
                                                            EC-04          -2,533                  01/17/20   02/06/20    S&L ELECTRIC, INC.                  
                                                            EC-05               0                  09/29/21   12/02/22    S&L Electric, Inc                   
                                                            EC-06               0                  01/17/20   02/06/20    S&L ELECTRIC, INC.                  
                                                            EC-07               0                  03/02/20   06/29/20    S&L ELECTRIC, INC.                  
                                                            EC-08               0                  03/02/20   06/29/20    S&L ELECTRIC, INC.                  
                                                            EC-09               0                  03/02/20   06/29/20    S&L ELECTRIC, INC.                  
                                                            EC-10               0                  03/02/20   06/29/20    S&L ELECTRIC, INC.                  
                                                            EC-11               0                  06/10/20   07/08/20    S&L ELECTRIC, INC.                  
                                                            EC-12               0                  06/10/20   07/08/20    S&L ELECTRIC, INC.                  
                                                            EC-13          -8,184                  06/10/20   07/08/20    S&L ELECTRIC, INC.                  
                                                            EC-14               0                  06/10/20   07/08/20    S&L ELECTRIC, INC.                  
                                                            EC-15               0                  11/10/20   01/27/21    S&L ELECTRIC, INC.                  
                                                            EC-19               0                  01/22/21   04/09/21    S&L ELECTRIC, INC.                  
                                                            EC-21               0                  09/29/21   12/02/22    S&L Electric, Inc                   
                                                            EC-21               0                  10/22/21   12/06/22    S&L Electric, Inc                   
                                                            EC-23               0                  04/28/21   08/02/21    S&L ELECTRIC, INC.                  
                                                            EC-24               0                  04/29/21   08/02/21    S&L ELECTRIC, INC.                  
                                                            EC-27               0                  11/16/21   12/12/22    S&L Electric Inc                    
                                                            EC-28               0                  11/16/21     /  /      S&L Electric, Inc                   
                                                            GC-05          28,288                  07/02/19   11/05/19    BETTE & CRING, LLC                  
                                                            GC-06          16,121                  07/02/19   11/05/19    BETTE & CRING, LLC                  
                                                            GC-07         -21,722                  07/02/19   07/05/19    BETTE & CRING, LLC                  
                                                            GC-08               0                  07/02/19   07/05/19    BETTE & CRING, LLC                  
                                                            GC-09               0                  04/28/21   08/12/21    BETTE & CRING, LLC                  
                                                            GC-10               0                  09/17/19   09/24/19    BETTE & CRING, LLC                  
                                                            GC-11               0                  09/17/19   09/24/19    BETTE & CRING, LLC                  
                                                            GC-12               0                  09/17/19   09/24/19    BETTE & CRING, LLC                  
                                                            GC-13               0                  09/17/19   09/24/19    BETTE & CRING, LLC                  
                                                            GC-15               0                  01/17/20   02/13/20    BETTE & CRING, LLC                  
                                                            GC-16               0                  01/17/20   02/13/20    BETTE & CRING, LLC                  
                                                            GC-17               0                  01/17/20   03/04/20    BETTE & CRING, LLC                  
                                                            GC-18               0                  01/17/20   03/04/20    BETTE & CRING, LLC                  
                                                            GC-19               0                  01/17/20   03/05/20    BETTE & CRING, LLC                  
                                                            GC-20               0                  01/17/20   03/05/20    BETTE & CRING, LLC                  
                                                            GC-21               0                  01/17/20   03/05/20    BETTE & CRING, LLC                  
                                                            GC-22               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-23               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-24               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-25               0                  04/28/21   08/12/21    BETTE & CRING, LLC                  
                                                            GC-26               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-27               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-28               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-29               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-30               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-31               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-32               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-33               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-34               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-35               0                  03/02/20   10/30/20    BETTE & CRING, LLC                  
                                                            GC-36               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-37               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-38               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-39               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-40               0                  03/27/20   07/14/20    BETTE & CRING, LLC                  
                                                            GC-41               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-42               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-43               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-44               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-45               0                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-46          33,546                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-47          34,737                  06/10/20   08/05/20    BETTE & CRING, LLC                  
                                                            GC-48          -2,944                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-49          28,860                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-50          15,443                  07/28/20   10/26/20    BETTE & CRING, LLC                  
                                                            GC-51          37,428                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-52           6,953                  07/28/20   10/26/20    BETTE & CRING, LLC                  
                                                            GC-53          20,221                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-54          12,955                  07/28/20   10/26/20    BETTE & CRING, LLC                  
                                                            GC-55          14,553                  07/28/20   10/26/20    BETTE & CRING, LLC                  
                                                            GC-56          25,903                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-58           5,721                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-60          18,288                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-61           5,836                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-62           8,657                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-64           9,486                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-65           9,660                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-67           9,734                  11/25/20   05/07/21    BETTE & CRING, LLC                  
                                                            GC-68          28,498                  11/25/20   05/07/21    BETTE & CRING, LLC                  
                                                            GC-69          14,761                  12/16/20   03/01/21    BETTE & CRING, LLC                  
                                                            GC-70          10,970                  12/16/20   03/01/21    BETTE & CRING, LLC                  
                                                            GC-71           4,076                  12/16/20   03/01/21    BETTE & CRING, LLC                  
                                                            GC-76           8,557                  04/28/21   08/12/21    BETTE & CRING, LLC                  
                                                            GC-80          17,665                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-81          15,322                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-85           2,485                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-87           9,932                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-88           9,229                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-89           4,383                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-90           2,333                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-95           3,380                  10/16/21   08/16/22    Bette&Cring, Inc                    
                                                            MC-01               0                  09/17/19   09/18/19    J&A MECHANICAL CONTRACTORS          
                                                            MC-02          -3,786                  09/17/19   09/18/19    J&A MECHANICAL CONTRACTORS          
                                                            MC-03               0                  09/17/19   09/18/19    J&A MECHANICAL CONTRACTORS          
                                                            MC-04          -2,800                  09/17/19   09/18/19    J&A MECHANICAL CONTRACTORS          
                                                            MC-05               0                  03/02/20   06/29/20    J&A MECHANICAL CONTRACTORS          
                                                            MC-06               0                  06/10/20   07/08/20    J&A MECHANICAL CONTRACTORS          
                                                            MC-07          -2,944                  10/19/21   12/06/22    J&A Mech Contractors, Inc           
                                                            MC-08          -7,710                  10/19/21   12/06/22    J&A Mech Contractors, Inc           
                                                            MC-09               0                  12/16/20   03/04/21    J&A MECHANICAL CONTRACTORS          
                                                            MC-10               0                  12/16/20   03/04/21    J&A MECHANICAL CONTRACTORS          
                                                            MC-12               0                  09/16/21   12/01/22    J&A mech Contractors, Inc           
                                                            MC-13          -1,112                  09/16/21   12/01/22    J&A Mech Contractors, Inc           
                                                            MC-14               0                  09/16/21   12/01/22    J&A Mech Contractors, Inc           
                                                            MC-15               0                  10/18/21   12/05/22    J&A Mech Contractors, Inc           
                                                            MC-17               0                  10/18/21   12/05/22    J&A Mech Contractors, Inc           
                                                            MC-19               0                  11/01/21   12/09/22    J&A Mechanical Contractors, INC.    
                                                            MC-20               0                  11/16/21   12/12/22    J&A Mech Contr, Inc                 
                                                            MC-21        -202,997                  11/16/21   12/12/22    J&A Mech Contr, Inc                 
                                                            PC-01               0                  07/02/19   07/08/19    SIRACUSA MECHANICAL, INC.           
                                                            PC-02               0                  07/02/19   07/08/19    SIRACUSA MECHANICAL, INC.           
                                                            PC-03               0                  07/02/19   07/08/19    SIRACUSA MECHANICAL, INC.           
                                                            PC-04               0                  07/02/19   07/08/19    SIRACUSA MECHANICAL, INC.           
                                                            PC-05               0                  09/17/19   09/18/19    SIRACUSA MECHANICAL, INC.           
                                                            PC-06               0                  09/17/19   09/18/19    SIRACUSA MECHANICAL, INC.           
                                                            PC-07               0                  09/17/19   09/18/19    SIRACUSA MECHANICAL, INC.           
                                                            PC-08               0                  03/02/20   06/29/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-09               0                  03/02/20   06/29/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-10               0                  03/02/20   06/29/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-11          12,599                  07/15/20   09/02/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-15           5,512                  07/15/20   09/02/20    SIRACUSA MECHANICAL, INC.           
                                                            PC-19           6,546                  11/10/20   01/27/21    SIRACUSA MECHANICAL, INC.           
                                                            PC-26           1,456                  11/16/21   12/12/22    Siracusa Mech, Inc                  
                                                            RC-02               0                  08/21/20   10/30/20    RSI ROOFING, INC.                   
                                                            RC-06               0                  09/24/20   11/25/20    RSI ROOFING, INC.                   
 
19-0451   Reconstruction               0-003-018  11/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  06/30/20   10/20/20    ERSI                                
 
19-1185   Reconstruction               0-003-019  03/05/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  10/29/21   12/08/22    S&L Electric, Inc                   
                                                            EC-02               0                  11/12/21   12/09/22    S&L Electric, Inc                   
                                                            EC-03               0                  11/23/21   12/14/22    S&L Electric Inc                    
                                                            EC-04            -700                  11/23/21   12/14/22    S&L Electric Inc                    
                                                            GC-01               0                  04/28/21   05/19/21    BOULEY ASSOCIATES, INC.             
                                                            GC-02               0                  04/28/21   05/19/21    BOULEY ASSOCIATES, INC.             
                                                            GC-05               0                  09/10/21   11/29/22    Bouley Associates, Inc              
                                                            PC-01           6,425                  10/21/22   12/06/22    J&A Mechanical Contractors, Inc.    
                                                            SC-01               0                  11/23/21   12/14/22    Edge Civil Corp                     
                                                            SC-02               0                  11/23/21   12/14/22    Edge Civil Corp                     
                                                            SC-03               0                  10/28/21   12/08/22    Edge Civil Corp                     
                                                            SC-04           5,579                  10/28/21   12/08/22    Edge Civil Corp                     
                                                            SC-05           1,455                  10/28/21   12/08/22    Edge Civil Corp                     
                                                            SC-06          14,851                  11/23/21   12/14/22    Edge Civil Corp                     
                                                            SC-07           7,271                  10/28/21   12/08/22    Edge Civil Corp                     
                                                            SC-08           5,741                  10/28/21   12/08/22    Edge Civil Corp                     
                                                            SC-09         -20,900                  10/28/21   12/08/22    Edge Clvil Corp                     
 
21-0658FC Reconstruction               0-003-020  11/12/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-1            -8,000                  08/01/22   09/26/23    Shawn Malone Excavating             
 
22-2490   Reconstruction               0-003-021  08/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1817FP Reconstruction               0-003-FP1  05/22/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1265SC Visual Structural Inspection 0-003-SC1  02/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pennellville ES(Bldg. Sold 2013):
97-1014   Reconstruction               0-004-003  04/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1220   Reconstruction               0-004-004  04/25/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1432   Reconstruction               0-004-005  03/22/02  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0581   Reconstruction               0-004-006  05/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            201-003        14,258                  07/16/10   08/23/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-008         1,390                  12/01/10   01/06/11    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            202-005         1,950                  07/16/10   08/23/10    LAN-CO COMPANIES INC                
                                                            202-011           770                  12/01/10   01/06/11    LAN-CO COMPANIES INC                
                                                            203-027           319                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-033           215                  02/10/11   03/03/11    BOULEY ASSOCIATES INC               
                                                            204-001        18,018                  07/26/10   09/07/10    AIRTECH HEATING AND A-C SYSTEMS INC 
                                                            204-002        13,724                  07/26/10   09/07/10    AIRTECH HEATING AND A-C SYSTEMS INC 
                                                            205-001        -1,390                  07/26/10   09/13/10    GREEN PLUMBING INC                  
                                                            205-002        14,298                  07/26/10   09/13/10    GREEN PLUMBING INC                  
                                                            206-004         4,378                  07/26/10   09/13/10    EDGELINE ELECTRIC CORP              
                                                            206-030           489                  02/08/11   05/04/11    EDGELINE ELECTRIC CORP              
 

          Junior High School:
97-1015   Reconstruction               0-005-004  04/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1221   Reconstruction               0-005-005  04/25/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1433   Reconstruction               0-005-007  03/22/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1050   Additions and Alterations    0-005-008  09/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-001        17,136                  02/17/09   05/05/09    MARKI'S INC. DBA LANDMARK ENTERPRISE
                                                            101-005         9,853                  12/05/08   01/22/09    MARKI'S INC DBA LANDMARK ENTERPRISES
                                                            101-006       290,753                  02/17/09   06/22/09    MARKI'S INC. DBA LANDMARK ENTERPRISE
                                                            101-008         9,635                  02/17/09   05/05/09    MARKI'S INC.DBA LANDMARK ENTERPRISES
                                                            101-009        38,857                  02/17/09   05/05/09    MARKI'S INC.DBA LANDMARK ENTERPRISES
                                                            101-011         4,300                  05/20/09   08/14/09    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-017         3,000                  12/09/09   02/04/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-019         2,205                  06/22/10   08/23/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-022        -4,680                  06/22/10   08/23/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-023         5,549                  06/22/10   08/23/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            102-001         7,346                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-003         4,988                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-004        48,300                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-006        27,300                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-007        12,010                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-008        15,935                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-009        22,667                  02/17/09   05/05/09    BETTE & CRING LLC                   
                                                            102-010         5,618                  02/17/09   05/05/09    BETTE & CRING LLC                   
                                                            102-012        55,099                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-013        53,896                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-014       -12,761                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-015         5,654                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-016        19,643                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-017        19,780                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-018         4,767                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-019         3,714                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-023        13,068                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-024        10,089                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-025         9,347                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-028       -77,676                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-029        15,720                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-031         9,365                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-032        11,397                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-033         9,617                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-035         8,893                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-036        11,089                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-037         8,626                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-040        47,040                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-042        11,215                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-043        29,820                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-045        16,485                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-047         9,345                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-048        17,386                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-049         4,788                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-050        20,468                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-053         7,594                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-055         8,435                  06/22/10   08/23/10    BETTE & CRING LLC                   
                                                            102-056         1,942                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-058        13,713                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-064         1,334                  06/22/10   08/23/10    BETTE & CRING LLC                   
                                                            102-065         2,902                  11/19/10   11/26/10    BETTE & CRING LLC                   
                                                            102-066         4,130                  11/19/10   11/26/10    BETTE & CRING LLC                   
                                                            102-068           143                  11/19/10   11/26/10    BETTE & CRING LLC                   
                                                            102-070        -4,795                  11/19/10   11/26/10    BETTE & CRING LLC                   
                                                            103-001        -4,755                  12/05/08   01/22/09    ACCURATE ACOUSTICAL, INC.           
                                                            103-002        16,135                  02/17/09   05/05/09    ACCURATE ACOUSTICAL, INC.           
                                                            103-003         9,731                  02/17/09   05/05/09    ACCURATE ACOUSTICAL, INC.           
                                                            103-004         1,707                  02/17/09   05/05/09    ACCURATE ACOUSTICAL, INC.           
                                                            103-005         5,054                  02/17/09   05/05/09    ACCURATE ACOUSTICAL, INC.           
                                                            103-006         6,580                  02/17/09   05/05/09    ACCURATE ACOUSTICAL, INC.           
                                                            103-007         8,895                  02/17/09   05/05/09    ACCURATE ACOUSTICAL, INC.           
                                                            103-008         8,431                  05/20/09   08/14/09    ACCURATE ACOUSTICAL INC             
                                                            103-009         7,087                  05/20/09   08/14/09    ACCURATE ACCOUSTICAL INC            
                                                            103-010         2,329                  11/03/09   12/28/09    ACCURATE ACOUSTICAL INC             
                                                            103-011         1,386                  11/03/09   12/28/09    ACCURATE ACOUSTICAL INC             
                                                            103-012        14,804                  12/09/09   02/04/10    ACCURATE ACOUSTICAL INC             
                                                            103-013        18,229                  12/09/09   02/04/10    ACCURATE ACOUSTICAL INC             
                                                            103-016         1,855                  12/09/09   02/04/10    ACCURATE ACOUSTICAL INC             
                                                            103-017         7,726                  07/07/10   12/03/10    ACCURATE ACOUSTICAL INC             
                                                            103-018        10,068                  07/26/10   11/30/10    ACCURATE ACOUSTICAL INC             
                                                            103-019        10,328                  07/26/10   11/30/10    ACCURATE ACOUSTICAL INC             
                                                            103-020         1,290                  07/07/10   12/03/10    ACCURATE ACOUSTICAL INC             
                                                            103-022         1,921                  11/19/10   11/26/10    ACCURATE ACOUSTICAL INC             
                                                            103-025        18,160                  11/19/10   11/26/10    ACCURATE ACOUSTICAL INC             
                                                            103-029         1,233                  02/08/11   03/01/11    ACCURATE ACOUSTICAL INC             
                                                            103-030           609                  02/08/11   03/01/11    ACCURATE ACOUSTICAL INC             
                                                            104-001       -12,792                  12/05/08   01/22/09    APPLE ROOFING CORP.                 
                                                            104-005         1,277                  02/17/09   05/05/09    APPLE ROOFING CORP.                 
                                                            104-006        10,177                  05/20/09   08/14/09    APPLE ROOFING CORP                  
                                                            104-007         6,694                  05/20/09   08/14/09    APPLE ROOFING CORP                  
                                                            104-009         6,985                  07/26/10   11/30/10    APPLE ROOFING CORP                  
                                                            104-011         5,926                  07/26/10   11/30/10    APPLE ROOFING CORP                  
                                                            104-013         2,040                  07/26/10   11/30/10    APPLE ROOFING CORP                  
                                                            104-015         2,530                  07/07/10   12/06/10    apple roofing corp                  
                                                            105-001        32,890                  12/05/08   03/25/09    AIRTECH HEATING AND AC SYSTEMS, INC.
                                                            105-003        -1,417                  11/03/09   12/28/09    AIRTECH HEATING AND A-C SYSTEMS INC 
                                                            105-004          -407                  12/09/09   02/04/10    AIRTECH HEATING AND A-C SYSTEMS INC 
                                                            105-006        18,006                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-010        11,731                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-011        10,709                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-012        10,831                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-013         4,883                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-014        11,138                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-016        11,084                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-017        14,364                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-018         1,995                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-019         3,618                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-020        -2,803                  12/12/11   09/28/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            106-001       -29,600                  12/05/08   03/25/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-008        26,707                  02/17/09   06/23/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-009        17,847                  02/17/09   12/28/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-010         6,183                  02/17/09   06/23/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-011         1,919                  10/11/11   08/06/12    BELLUCCI ENTERPRISES INC            
                                                            106-018           337                  07/26/10   11/30/10    BELLUCCI ENTERPRISES INC            
                                                            106-020         1,823                  07/26/10   11/30/10    BELLUCCI ENTERPRISES INC            
                                                            106-022           899                  11/19/10   11/26/10    BELLUCCI ENTERPRISES INC            
                                                            107-001         4,364                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
                                                            107-002        -7,890                  12/05/08   03/25/09    PATRICIA ELECTRIC INC.              
                                                            107-004        16,989           2,548  10/11/11   09/28/12    PATRICIA ELECTRIC, INC.             
                                                            107-005       -58,000                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
                                                            107-006         3,938                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
                                                            107-007       -27,779                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
                                                            107-012         3,682                  02/17/09   06/23/09    PATRICIA ELECTRIC, INC.             
                                                            107-013        10,752                  02/17/09   08/21/09    PATRICIA ELECTRIC, INC.             
                                                            107-015         3,186                  02/17/09   06/23/09    PATRICIA ELECTRIC, INC.             
                                                            107-017         3,217                  02/17/09   06/23/09    PATRICIA ELECTRIC, INC.             
                                                            107-018         8,584                  02/17/09   06/23/09    PATRICIA ELECTRIC, INC.             
                                                            107-019        10,408                  05/20/09   10/07/09    PATRICIA ELECTRIC INC               
                                                            107-021         2,064                  02/17/09   06/23/09    PATRICIA ELECTRIC, INC.             
                                                            107-023        19,348                  05/20/09   10/07/09    PATRICIA ELECTRIC INC               
                                                            107-024        11,277                  05/20/09   10/07/09    PATRICIA ELECTRIC INC               
                                                            107-027        12,856                  05/20/09   10/07/09    PATRICIA ELECTRIC INC               
                                                            107-028        17,706                  10/11/11   08/06/12    PATRICIA ELECTRIC INC               
                                                            107-029         6,606                  10/11/11   08/06/12    PATRICIA ELECTRIC INC               
                                                            107-032         3,086                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-034         3,498                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-035         5,124                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-037         1,085                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-039        13,005                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-040        40,541                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-042        14,494                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-043        10,839                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-044         3,914                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-049        11,426                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-050         7,443                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-051         5,971                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-053        35,513                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-054        13,275                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-055         1,298                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            107-057         4,872                  11/22/10   12/02/10    PATRICIA ELECTRIC INC               
                                                            107-059         2,107                  11/22/10   12/02/10    PATRICIA ELECTRIC INC               
                                                            107-060         1,767                  11/22/10   12/02/10    PATRICIA ELECTRIC INC               
                                                            107-061         4,000                  02/08/11   03/01/11    PATRICIA ELECTRIC INC               
                                                            203-021         2,867                  12/01/10   01/12/11    BOULEY ASSOCIATES INC               
                                                            206-028         3,587                  02/08/11   03/01/11    EDGELINE ELECTRIC CORP              
 
06-1518   Reconstruction               0-005-009  09/07/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0582   Reconstruction               0-005-010  05/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            201-005        19,327                  07/16/10   08/23/10    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-006         3,071                  12/12/11   07/16/12    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-010         1,309                  12/01/10   01/06/11    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            201-011        71,879                  02/08/11   05/04/11    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            202-006        13,307                  07/16/10   08/23/10    LAN-CO COMPANIES INC                
                                                            202-007         6,000                  07/16/10   08/23/10    LAN-CO COMPANIES INC                
                                                            202-010           600                  12/01/10   01/06/11    LAN-CO COMPANIES INC                
                                                            203-009        -1,490                  07/26/10   09/07/10    BOULEY ASSOCIATES INC               
                                                            203-013         5,267                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-018        13,860                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-023         1,150                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-028         8,625                  12/01/10   01/06/11    BOULEY ASSOCIATES INC               
                                                            203-032         1,042                  02/10/11   05/13/11    BOULEY ASSOCIATES INC               
                                                            203-035           399                  02/10/11   03/03/11    BOULEY ASSOCIATES INC               
                                                            203-038         5,405                  04/13/11   05/10/11    BOULEY ASSOCIATES INC               
                                                            204-005         6,214                  02/08/11   05/04/11    AIRTECH HEATING AND A-C SYSTEMS INC 
                                                            205-006         1,461                  02/08/11   05/04/11    GREEN PLUMBING INC                  
                                                            206-006         1,906                  07/26/10   09/13/10    EDGELINE ELECTRIC CORP              
                                                            206-012         2,774                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
                                                            206-017           989                  11/22/10   11/30/10    EDGELINE ELECTRIC CORP              
 
13-0056   Reconstruction               0-005-011  01/31/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            300-01              0                  10/14/14   10/20/14    Sands Brothers Roofing              
                                                            300-03              0                  10/14/14   10/20/14    Sands Brothers Roofing              
                                                            4-001          16,504                  10/14/14   10/20/14    HMI Mechanical Systems              
                                                            4-002          11,261                  10/14/14   10/20/14    HMI Mechanical Systems              
                                                            4-006          -1,202                  03/30/15   04/24/15    HMI Mechanical Systems              
                                                            400-01              0                  01/28/15   02/03/15    HMI Mechanical Systems, Inc.        
                                                            400-02              0                  01/28/15   02/03/15    HMI Mechanical Systems, Inc.        
                                                            5-003          -2,540                  09/12/14   09/24/14    Ridley Electric Co. Inc.            
                                                            EC-001              0                    /  /       /  /                                          
                                                            EC-001         -2,188                  06/22/15   07/30/15    Patricia Electric, Inc.             
                                                            HC2-001        -2,985                  08/13/15   08/27/15    DW & Crew Mechanicals, Inc.         
 
15-0031   Reconstruction               0-005-012  08/04/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            R-01           11,335                  06/30/16   08/01/16    WCA Roofing & Sheet Metal Co., Inc. 
 
16-2154   Reconstruction               0-005-013  10/24/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-01             0                  07/09/18   07/18/18    SIRACUSA MECHANICAL INC             
                                                            HVAC-02         6,787                  07/09/18   07/18/18    SIRACUSA MECHANICAL INC             
 
17-0212   Reconstruction               0-005-014  05/10/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2050   Reconstruction               0-005-015  09/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-17               0                  01/22/21   04/09/21    S&L ELECTRIC, INC.                  
                                                            EC-26               0                  04/28/21   08/02/21    S&L ELECTRIC, INC.                  
                                                            GC-03          27,740                  07/02/19   11/08/19    BETTE & CRING, LLC                  
                                                            GC-04          34,504                  07/02/19   11/05/19    BETTE & CRING, LLC                  
                                                            GC-14               0                  09/17/19   09/24/19    BETTE & CRING LLC                   
                                                            GC-77           3,661                  04/28/21   08/12/21    BETTE & CRING, LLC                  
                                                            GC-78           6,444                  04/28/21   08/12/21    BETTE & CRING, LLC                  
                                                            GC-79          11,832                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-83           8,102                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-91           5,298                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-92           9,155                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-93           2,178                  09/07/21   11/23/22    BETTE&CRING, LLC                    
                                                            GC-96           2,746                  10/15/21   08/16/22    Bette&Cring, LLC                    
                                                            MC-11               0                  09/16/21   06/16/22    J&A Mech Contractors, Inc           
                                                            MC-18               0                  10/18/21   12/05/22    J&A Mech Contractors, Inc           
                                                            RC-01               0                  09/11/20   11/25/20    RSI ROOFING, INC.                   
                                                            RC-03               0                  08/21/20   10/30/20    RSI ROOFING, INC.                   
                                                            RC-05               0                  09/24/20   11/25/20    RSI ROOFING, INC.                   
 
18-0305   Reconstruction               0-005-016  11/21/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1186   Reconstruction               0-005-017  03/05/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-03          -3,024                  04/19/21   05/25/21    BOULEY ASSOCIATES, INC.             
                                                            GC-04               0                  04/19/21   05/18/21    BOULEY ASSOCIATES, INC.             
 
20-0984   Reconstruction               0-005-018  03/15/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  06/25/21   04/04/22    S&L Electric                        
 
21-0447   Reconstruction               0-005-019  11/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -4,000                  06/27/22   04/04/23    Whitton Const LLC                   
 
21-0937FA Reconstruction               0-005-020  04/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           5,211                  09/18/23     /  /      DIEKOW ELECTRIC INC                 
 
22-0527   Reconstruction               0-005-021  11/01/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,000                  06/26/23   12/29/23    KNAOO ELECTRIC                      
 
02-1818FP Reconstruction               0-005-FP1  05/22/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Storage Building:
06-1051   New Construction             2-014-001  09/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-010         6,976                  02/17/09   05/05/09    MARKI'S INC. DBA LANDMARK ENTERPRISE
                                                            102-005        13,759                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-060         1,105                  06/22/10   08/23/10    BETTE & CRING LLC                   
                                                            105-008         3,725                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            106-004        -2,000                  12/05/08   03/25/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-007         4,974                  02/17/09   06/23/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-015         2,491                  07/26/10   11/30/10    BELLUCCI ENTERPRISES INC            
                                                            107-009         3,927                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
 

          Maint & Operations (Old Bus Garage):
97-1016   Reconstruction               5-001-002  04/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1434   Reconstruction               5-001-003  03/22/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1052   Reconstruction               5-001-004  09/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-015         5,040                  12/09/09   02/04/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-016        18,817                  12/09/09   02/04/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            102-020         2,071                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-026         8,127                  05/20/09   08/14/09    Bette & Cring                       
                                                            102-030         7,056                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-034         9,920                  11/03/09   12/28/09    BETTE & CRING LLC                   
                                                            102-041        -9,979                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-052         3,150                  06/22/10   12/06/10    BETTE & CRING LLC                   
                                                            102-062           750                  06/22/10   08/23/10    BETTE & CRING LLC                   
                                                            103-023           423                  11/19/10   11/26/10    ACCURATE ACOUSTICAL INC             
                                                            104-004          -998                  12/05/08   01/22/09    APPLE ROOFING CORP.                 
                                                            104-008         8,265                  12/09/09   06/28/10    APPLE ROOFING CORP                  
                                                            104-014         2,522                  11/19/10   11/26/10    APPLE ROOFING CORP                  
                                                            104-016           940                  11/19/10   11/26/10    APPLE ROOFING CORP                  
                                                            106-005          -800                  12/05/08   03/25/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-013        14,692                  12/12/11   09/28/12    BELLUCCI ENTERPRISES INC            
                                                            106-014         3,507                  07/26/10   11/30/10    BELLUCCI ENTERPRISES INC            
                                                            107-038         5,637                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-052         2,667                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            206-019         2,278                  11/22/10   12/02/10    EDGELINE ELECTRIC CORP              
 

          New Bus Garage:
06-1053   New Construction             5-013-001  09/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-002        19,500                  12/05/08   01/22/09    MARKI'S INC DBA LANDMARK ENTERPRISES
                                                            101-003        19,450                  12/05/08   01/22/09    MARKI'S INC DBA LANDMARK ENTERPRISES
                                                            101-004        15,050                  12/05/08   01/22/09    MARKI'S INC DBA LANDMARK ENTERPRISES
                                                            101-012         2,363                  10/11/11   01/18/12    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            101-013         2,718                  10/11/11     /  /      BETTE & CRING LLC                   
                                                            101-018        -5,200                  06/22/10   08/23/10    MARKI'S INC dba LANDMARK ENTERPRISES
                                                            102-002         6,982                  12/05/08   01/22/09    BETTE & CRING, LLC                  
                                                            102-011        50,867                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-021          -589                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-027         5,030                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-038         2,718                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-046         1,159                  12/09/09   02/04/10    BETTE & CRING LLC                   
                                                            102-063          -120                  06/22/10   08/23/10    BETTE & CRING LLC                   
                                                            102-071        -7,487                  02/08/11   03/01/11    BETTE & CRING LLC                   
                                                            103-014         7,254                  12/09/09   02/04/10    ACCURATE ACOUSTICAL INC             
                                                            104-003        -1,612                  12/05/08   01/22/09    APPLE ROOFING CORP.                 
                                                            104-012           812                  07/26/10   11/30/10    APPLE ROOFING CORP                  
                                                            105-002         5,941                  02/17/09   06/23/09    AIRTECH HEATING AND AC SYSTEMS, INC.
                                                            105-005        12,422                  12/09/09   02/04/10    AIRTECH HEATING AND A-C SYSTEMS INC 
                                                            105-007         6,416                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            105-015         4,119                  11/19/10   11/26/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            106-003        -4,000                  12/05/08   03/25/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-006         7,341                  12/05/08   03/25/09    BELLUCCI ENTERPRISES, INC.          
                                                            106-012         3,765                  11/03/09   12/28/09    BELLUCCI ENTERPRISES INC            
                                                            106-024         7,780                  04/13/11   05/10/11    BELLUCCI ENTERPRISES INC            
                                                            107-003       -11,486                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
                                                            107-008         1,119                  12/05/08   03/25/09    PATRICIA ELECTRIC, INC.             
                                                            107-014        14,021                  10/11/11   08/06/12    PATRICIA ELECTRIC, INC.             
                                                            107-026         8,162                  05/20/09   10/07/09    PATRICIA ELECTRIC INC               
                                                            107-030         1,292                  05/20/09   10/07/09    PATRICIA ELECTRIC INC               
                                                            107-031         3,529                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-033         4,145                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-036         1,684                  11/03/09   12/28/09    PATRICIA ELECTRIC INC               
                                                            107-056           310                  07/26/10   11/30/10    PATRICIA ELECTRIC INC               
                                                            206-024           209                  11/22/10   12/02/10    EDGELINE ELECTRIC CORP              
 

          New Press Box:
06-1054   New Construction             7-015-001  09/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            102-022         2,667                  05/20/09   08/14/09    BETTE & CRING LLC                   
                                                            102-061           375                  06/22/10   08/23/10    BETTE & CRING LLC                   
 

          Press Box II:
18-0838   New Construction             7-016-001  01/24/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          bistrict-Wide:
15-1158   Reconstruction               7-999-003  02/10/16  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1907   Reconstruction               7-999-004  06/30/16  NO CHANGE ORDERS ON ELECTRONIC FILE

BOCES OSWEGO STATUS REPORT ON CAPITAL PROJECTS
District No.: 46-90-00-00
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          West 450 (West Annex 1 Instr):
03-0067   Reconstruction               0-003-001  03/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            3,000                  08/24/04   09/17/04    C&S Tech. Resources                 
                                                            GC-2           12,595                  12/08/04   12/28/04    C&S Tech. Resources                 
                                                            GC-3              364                  12/08/04   12/28/04    C&S Tech. Resources                 
                                                            H-1               654                  10/28/04   11/24/04    C&S Tech. Resources                 
 
12-1173   Reconstruction               0-003-003  07/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-02           4,798                  06/10/16   11/26/18    WEYDMAN ELECTRIC                    
 
13-0380   Reconstruction               0-003-004  12/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          Burton Ramer Technical Career Center:
93-1321   Reconstruction               0-007-003  05/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0695   Reconstruction               0-007-004  02/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0807   Reconstruction               0-007-005  04/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1112   Additions and Alterations    0-007-006  08/22/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01          22,329                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-02          18,382                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-03           3,640                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-04          26,453                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-05         103,530                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-06           6,545                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-07          12,760                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-10         130,201                  08/28/14   09/05/14    Jag Environmental, LLC              
                                                            AA-11          20,333                  09/22/14   10/01/14    Jag Environmental, LLC              
                                                            AA-12           8,087                  05/14/15   06/18/15    Jag Environmental LLC               
                                                            AA-13         -18,000                  11/16/15   12/23/15    JAG Environmental, LLC              
                                                            AQ-01          17,970                  10/20/14   10/21/14    Facilities Equipment & Service, Inc.
                                                            AQ-02          -1,553                  11/16/15   12/23/15    Facilties Equipment & Services, Inc.
                                                            CC-03          23,416                  05/19/16     /  /      WEYDMAN ELECTRIC                    
                                                            CQ-01          -8,754                  11/16/15   12/23/15    Northeast Interior Systems, Inc.    
                                                            CQ-02           1,007                  06/13/16   07/27/16    NORTHEAST INTERIOR SUSTEMS          
                                                            FQ-01         -11,290                  05/27/14   06/30/14    Second & Braod Street Sales Corp.   
                                                            FQ-02         -16,524                  11/16/15   12/23/15    Second & Broad Street Sales Corp.   
                                                            GC-02         -36,398                  02/17/17   02/24/17    Murnane Building Contractors, Inc.  
                                                            PC-01         -44,115                  05/19/16   05/27/16    LAWMAN HEATING & COOLING            
                                                            RC-02         -30,646                  08/19/16   10/06/16    Pulver Roofing Co., Inc.            
                                                            SC-02R         16,569                  07/09/15   07/30/15    Robert H. Law, Inc.                 
                                                            SC-03R         16,035                  07/09/15   07/30/15    Robert H. Law, Inc.                 
                                                            SC-04           4,083           4,083  12/10/15   01/04/16    Robert H. Law, Inc.                 
 
09-1118   Reconstruction               0-007-007  07/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P1-01          -5,422                  08/02/13   12/18/13    J & A Mechanical Contractors, Inc.  
 
10-1131   Reconstruction               0-007-008  06/06/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1084   Reconstruction               0-007-011  12/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0486   Reconstruction               0-007-012  10/21/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02          -2,433                  04/18/16   05/12/16    PAC & ASSOCIATES OF OSWEGO,INC      
 
21-0580   Reconstruction               0-007-013  12/10/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-01             0                  05/01/23   12/28/23    AIRSIDE TECH CORP                   
                                                            HVAC-02             0                  05/01/23   12/28/23    AIRSIDE TECH CORP                   
                                                            HVAC-03       -21,227                  05/01/23   12/28/23    AIRSIDE TECH CORP                   
 

          North 510(Hero Bld):
93-1322   Reconstruction               0-008-001  05/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0696   Reconstruction               0-008-002  02/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0467   Reconstruction               0-008-003  12/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1119   Reconstruction               0-008-005  07/06/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1429   Reconstruction               0-008-006  08/22/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          82,000                  05/20/15   06/09/15    Pulver Roofing Co., Inc.            
                                                            SC-01          22,196                  05/20/15   06/18/15    Robert H. Law, Inc.                 
 
12-1085   Reconstruction               0-008-007  12/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          South 330 (Bldg B-Trades):
93-1323   Reconstruction               0-011-001  05/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0697   Reconstruction               0-011-002  02/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0810   Reconstruction               0-011-003  04/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1174   Reconstruction               0-011-005  07/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-08          10,980                  05/27/14   06/30/14    Jag Environmental, LLC              
                                                            AA-09           4,351                  08/28/14   09/05/14    Jag Environmental, LLC              
 
13-0381   Reconstruction               0-011-006  12/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          East 220 (Special Education):
93-1324   Reconstruction               0-015-002  05/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0698   Reconstruction               0-015-003  02/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0806   Reconstruction               0-015-004  04/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1175   Reconstruction               0-015-006  07/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-04          -8,778                  05/19/16   05/27/16    WEYDMAN ELECTRIC                    
                                                            EC-01         -56,226                  05/05/16   05/19/16    PATRICIA ELECTRIC                   
                                                            GC-01          -2,602                  08/26/16   10/06/16    Murnane Building Contractors, Inc.  
                                                            HC-01        -223,503                  08/29/16   10/04/16    Lawman Heating & Cooling, Inc.      
 
13-0382   Reconstruction               0-015-007  12/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0487   Reconstruction               0-015-008  10/21/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01          15,077                  06/10/16   07/07/16    MARK CERRONE INC                    
                                                            EC-01         -18,716                  08/29/16   10/28/16    Lawman Heating & Cooling, Inc.      
                                                            GC-01         -69,155                  04/18/16   05/12/16    PAC & ASSOCIATES OF OSWEGO,INC      
                                                            GC-03          -7,735                  04/18/16   05/12/16    PAC & ASSOCIATES OF QSWEGO, INC     
                                                            GC-04         -40,149                  09/28/16     /  /      PAC & Associates of Oswego, Inc.    
                                                            HC-01           8,800                  04/18/16   05/12/16    LAWMAN HEATING & COOLING, INC       
                                                            HC-02         -15,916                  09/01/16   11/02/16    Lawman Heating & Cooling, Inc.      
                                                            PC-01           4,178                  05/05/16   07/07/16    OSWEGO MECHANICAL                   
                                                            PC-02             457                  08/26/16   10/05/16    Oswego Mechanical, Inc.             
 
19-1832   Reconstruction               0-015-009  07/21/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-01       -16,000                  10/05/20   12/02/20    NAIRY MECHANICAL, LLC               
                                                            HVAC-02             0                  01/22/21   04/09/21    NAIRY MECHANICAL, LLC               
                                                            HVAC-03             0                  01/22/21   04/09/21    NAIRY MECHANICAL, LLC               
                                                            HVAC-04             0                  01/22/21   04/09/21    NAIRY MECHANICAL, LLC               
                                                            HVAC-05             0                  03/30/21   05/12/21    NAIRY MECHANICAL, LLC               
                                                            HVAC-06        -9,578                  10/08/21   07/19/22    Nairy Mech, LLC                     
 

          West 460 (Pole Barn Alt. Schl):
11-1428   Reconstruction               0-028-002  08/22/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1086   Reconstruction               0-028-003  12/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          West 410 (Teacher Center):
11-1427   Reconstruction               1-037-003  08/22/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1087   Reconstruction               1-037-004  12/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          South 310 (Pole Barn O & M):
11-1426   Reconstruction               2-029-001  08/22/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0383   Reconstruction               2-029-002  12/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          North 520 (Bus Garage Maint):
01-0722   Reconstruction               5-004-001  06/28/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,500                  05/27/03   06/02/03    Pizzuto Plumbing                    
                                                            1             -10,000                  07/07/03   07/11/03    Testa Const.                        
                                                            2                 540                  05/27/03   06/02/03    Pizzuto Plumbing                    
                                                            2                 936                  07/07/03   07/11/03    Testa Const.                        
                                                            2               3,950                  08/28/03   09/09/03    OKAR Equip.                         
                                                            3                 804                  07/07/03   07/11/03    Testa Const.                        
                                                            3               1,052                  08/28/03   09/09/03    Pizzuto Plumbing                    
                                                            3               2,191                  08/28/03   09/12/03    OKAR Equip.                         
                                                            4                 280                  07/07/03   07/11/03    Testa Const.                        
                                                            4                 615                  08/28/03   09/09/03    OKAR Equip.                         
                                                            6                 449                  08/28/03   09/09/03    OKAR Equip.                         
                                                            7               6,524                  08/28/03   09/12/03    OKAR Equip.                         
                                                            E-1            51,750                  01/03/03   01/09/03    Knapp Elec.                         
                                                            E-2             2,424                  03/19/03   03/28/03    Knapp Elec.                         
                                                            E-3               687                  05/27/03   06/02/03    Knapp Elec.                         
                                                            E-4               900                  10/20/05   10/20/05    Knapp Electric                      
                                                            E-5             4,689                  07/07/03   07/11/03    Knapp Elec.                         
                                                            E-6             3,039                  07/07/03   07/11/03    Knapp Elec.                         
                                                            Lift-1            685                  01/03/03   01/09/03    OKAR Equip.                         
 
11-1430   Reconstruction               5-004-004  08/22/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1088   Reconstruction               5-004-005  12/04/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
99-0809   Reconstruction               7-999-002  04/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0808   Reconstruction               7-999-003  04/19/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            TC-1            2,500                  04/08/04   09/27/04    Expanets/AVAYA                      
                                                            TC-2            1,200                  04/08/04   09/27/04    Expanets/AVAYA                      
                                                            TC-3          -39,424                  04/08/04   04/27/04    Expanets/AVAYA                      
 
11-1447   Reconstruction               7-999-004  07/18/12  NO CHANGE ORDERS ON ELECTRONIC FILE