WEST GENESEE CSD AT CAMILLUS STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-01-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          East Hill Elementary School:
90-0809   Reconstruction               0-002-003  02/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2451   Reconstruction               0-002-005  06/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1                0                  03/26/04   04/12/04    BF Yenny Const.                     
 
04-0811   Reconstruction               0-002-006  03/25/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EH-S-1              0                  11/07/05   07/31/06    Robert H. Law                       
                                                            EH-S-2          6,708                  11/07/05   11/21/05    Robert H. Hall                      
                                                            R-1            19,722                  02/14/08   03/08/08    J & B INSTALLATIONS, INC            
 
07-2093   Reconstruction               0-002-007  12/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1396   Reconstruction               0-002-008  06/14/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0600   Reconstruction               0-002-009  08/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ED H-3              0                  11/07/06   11/16/16    D.W. Crew Mechanicals, Inc.         
                                                            EG GC-14        1,385                  01/03/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            EH AE-1         5,500                  06/20/16   07/08/16    Facilities Equipment and Service Inc
                                                            EH E-1        -11,467                  03/07/16   03/24/16    Kaplan-Schmidt Electric, Inc.       
                                                            EH E-2         17,560                  03/07/16   03/24/16    Kaplan-Schmidt Electric, Inc.       
                                                            EH E-3          1,400                  06/20/16   07/08/16    Kaplan-Schmidt Electric Inc.        
                                                            EH E-4              0                  10/17/16   11/01/16    Kaplan-Schmidt Electric, Inc.       
                                                            EH E-5          7,029                  10/17/16   11/01/16    Kaplan-Schmidt Electric, Inc.       
                                                            EH E-6          1,850                  11/07/16   11/16/16    Kaplan-Schmidt Electric Inc.        
                                                            EH E-7          1,022                  01/03/17   01/06/17    Kaplan-Schmidt Electric, Inc.       
                                                            EH FC-1         3,409                  10/17/16   11/01/16    Stonhard Corp.                      
                                                            EH GC-1         9,061                  02/22/16   05/10/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-10            0                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-11            0                  11/07/16   11/16/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-12        2,796                  01/03/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            EH GC-13          951                  01/03/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            EH GC-2        -2,745                  02/22/16     /  /      PAC & Associates of Oswego, Inc.    
                                                            EH GC-3             0                  04/11/16     /  /      PAC & Associates of Oswego, Inc.    
                                                            EH GC-4             0                  06/20/16   07/08/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-5             0                  06/20/16   07/08/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-6             0                  08/24/16   12/28/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-7         2,568                  08/24/16   12/29/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-8             0                  08/24/16   12/28/16    PAC & Associates of Oswego, Inc.    
                                                            EH GC-9             0                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            EH H-1        -15,836                  02/22/16   05/10/16    D.W. Crew Mechanicals Inc.          
                                                            EH H-2              0                  10/17/16   11/01/16    D.W. Crew Mechanicals, Inc.         
                                                            EH P-1         -6,624                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            EH P-10        -2,124                  01/03/17   01/06/17    Joy Process Mechanical              
                                                            EH P-2         12,323                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            EH P-3          6,114                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            EH P-4          1,291                  03/07/16   03/24/16    Joy Process Mechanical              
                                                            EH P-5              0                  04/11/16   12/28/16    Joy Process Mechanical              
                                                            EH P-6        -13,038                  04/11/16   12/28/16    Joy Process Mechanical              
                                                            EH P-7          7,736                  04/11/16   12/28/16    Joy Process Mechanical              
                                                            EH P-8              0                  10/17/16   11/01/16    Joy Process Mechanical              
                                                            EH P-9              0                  01/03/17   01/06/17    Joy Process Mechanical              
                                                            EH S-1         15,576                  06/20/16   07/08/16    Landmark Enterprises                
 
17-2003   Reconstruction               0-002-010  09/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-01             0                  09/13/19   09/16/19    KNAPP ELECTRIC, INC.                
                                                            EC-05             601                  06/30/20   07/28/20    KNAPP ELECTRIC, INC.                
                                                            GC-07F            305                  11/17/20   02/10/21    BELLOWS CONSTRUCTION                
 
19-1880   Reconstruction               0-002-011  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0558FP Reconstruction               0-002-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Onondaga Road Elementary:
92-0464   Reconstruction               0-004-002  01/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0812   Reconstruction               0-004-004  03/25/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1              370                  10/24/05   07/31/06    Bellows Construction                
                                                            OR-S-1          3,352                  11/07/05   07/31/06    ROBERT H. LAW                       
                                                            OR-S-2         10,642                  11/07/05   07/31/06    ROBERT H. LAW                       
                                                            R-2             2,635                  02/14/08   03/08/08    J&B INSTALLATIONS, INC              
 
07-2094   Reconstruction               0-004-005  12/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0601   Reconstruction               0-004-006  08/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            OR E-1        -15,178                  03/07/16   03/24/16    Kaplan-Schmidt Electric Inc.        
                                                            OR E-2        -14,614                  03/07/16   03/24/16    Kaplan-Schmidt Electric Inc.        
                                                            OR E-3          1,400                  06/20/16   07/08/16    Kaplan-Schmidt Electric, Inc.       
                                                            OR E-4              0                  10/17/16   11/01/16    Kaplan-Schmidt Electric, Inc.       
                                                            OR E-5          8,173                  10/17/16   11/01/16    Kaplan-Shcmidt Electric, Inc.       
                                                            OR E-6            858                  01/03/17   01/06/17    Kaplan-Schmidt Electric, Inc.       
                                                            OR FC-1         3,409                  10/17/16   11/01/16    Stonhard Corp.                      
                                                            OR GC-1        -8,731                  02/22/16   05/10/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-10          649                  11/07/16   11/16/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-11          425                  01/03/17   01/09/17    PAC Associates of Oswego, Inc.      
                                                            OR GC-12          803                  01/03/17   01/09/17    PAC &  Associates of Oswego, Inc.   
                                                            OR GC-13        1,385                  01/03/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            OR GC-2        -2,645                  02/22/16   05/10/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-3             0                  04/11/16   12/28/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-4             0                  06/20/16   07/08/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-5             0                  08/24/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-6         2,568                  08/24/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-7             0                  08/24/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-8             0                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            OR GC-9             0                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            OR H-1        -15,836                  02/22/16   05/10/16    D.W. Crew Mechanicals, Inc.         
                                                            OR H-2              0                  10/17/16   11/01/16    D.W. Crew Mechanicals, Inc. q0      
                                                            OR H-3              0                  11/07/16   11/16/16    D.W. Crew Mechanicals, Inc.         
                                                            OR P-1        -13,808                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            OR P-2        -32,000                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            OR P-3         11,839                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            OR P-4          2,332                  03/07/16   03/24/16    Joy Process Mechanical              
                                                            OR P-5          5,311                  04/11/16   12/28/16    Joy Process Mechanical              
                                                            OR P-6        -13,038                  04/11/16   12/28/16    Joy Process Mechanical              
                                                            OR P-7          6,623                  04/11/16   12/28/16    Joy Process Mechanical              
 
17-2004   Reconstruction               0-004-007  09/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-02             0                  09/13/19   09/16/19    KNAPP ELECTRIC, INC.                
                                                            EC-03             601                  06/30/20   07/28/20    KNAPP ELECTRIC, INC.                
                                                            GC-07E            305                  11/17/20   02/10/21    BELLOWS CONSTRUCTION                
 
19-1887   Reconstruction               0-004-008  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0559FP Reconstruction               0-004-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Split Rock Elementary School:
91-0163   Reconstruction               0-005-001  08/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0961   Reconstruction               0-005-002  04/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1052   Reconstruction               0-005-003  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            S-21           23,000                  01/28/08   03/08/08    ROBERT H. LAW                       
                                                            S-22            9,044                  01/28/08   03/08/08    ROBERT H LAW                        
                                                            S-23            8,789                  01/28/08   08/12/08    ROBERT H. LAW                       
 
07-2095   Reconstruction               0-005-004  12/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1397   Reconstruction               0-005-005  06/14/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               850                  04/25/13   07/12/13    CHARLES T DRISCOLL MASONRY RESTORAT 
 
14-0602   Reconstruction               0-005-006  08/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SR E-1        -25,952                  03/07/16   03/24/16    Kaplan-Schmidt Electric Inc.        
                                                            SR E-2          2,703                  03/07/16   03/24/16    Kaplan-Schmidt Electric Inc.        
                                                            SR E-3          1,009                  06/20/16   07/08/16    Kaplan-Schmidt Electric Inc.        
                                                            SR E-4              0                  10/17/16     /  /      Kaplan-Schmidt Electric, Inc.       
                                                            SR E-5          1,749                  11/07/16   11/16/16    Kaplan-Schmidt Electric, Inc.       
                                                            SR FC-1         3,741                  10/17/16   11/01/16    Stonhard Corp.                      
                                                            SR GC-1        -6,838                  02/22/16   05/10/16    PAC & Associates of Oswego, Inc.    
                                                            SR GC-2        -5,705                  02/22/16   05/10/16    PAC & Associates of Oswego, Inc.    
                                                            SR GC-3         1,193                  04/11/16     /  /      PAC & Associates of Oswego, Inc.    
                                                            SR GC-4         2,046                  06/20/16   07/08/16    PAC & Associates of Oswego, Inc.    
                                                            SR GC-5             0                  06/20/16   07/08/16    PAC & Associates of Oswego, Inc.    
                                                            SR GC-6             0                  08/24/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            SR GC-7             0                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            SR GC-8             0                  10/17/16   11/01/16    PAC & Associates, Inc.              
                                                            SR GC-9         2,406                  01/03/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            SR H-1        -22,811                  02/22/16   05/10/16    D.W. Crew Mechanicals, Inc.         
                                                            SR H-2              0                  11/07/16   11/16/16    D.W. Crew Mechanicals, Inc.         
                                                            SR H-3              0                  01/03/17   01/06/17    D.W. Crew Mechanicals, Inc.         
                                                            SR H-4          5,452                  01/03/17   01/06/17    D.W. Crew Mechanicals, Inc.         
                                                            SR P-1         -5,474                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            SR P-2              0                  08/24/16   11/21/16    Joy Process Mechanical              
                                                            SR P-3              0                  10/17/16   11/01/16    Joy Process Mechanical              
                                                            SR P-4              0                  01/03/17   01/06/17    Joy Process Mechanical              
 
17-2005   Reconstruction               0-005-007  09/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-03             0                  09/13/19   09/16/19    KNAPP ELECTRIC, INC.                
                                                            AAEC-09             0                  10/22/19   10/25/19    KNAPP ELECTRIC, INC.                
                                                            AAGC-05             0                  09/13/19   09/20/19    BELLOWS CONSTRUCTION                
                                                            AAGC-09             0                  10/22/19   10/25/19    BELLOWS CONSTRUCTION                
                                                            AAGC-11             0                  10/22/19   10/25/19    BELLOWS CONSTRUCTION                
                                                            AAGC-12             0                  10/22/19   10/25/19    BELLOWS CONSTRUCTION                
                                                            AAGC-13             0                  10/22/19   10/25/19    BELLOWS CONSTRUCTION                
                                                            AAGC-15             0                  12/18/19   01/06/20    BELLOWS CONSTRUCTION                
                                                            EC-02           1,870                  01/31/20   03/20/20    KNAPP ELECTRIC, INC.                
                                                            EC-04             601                  06/30/20   07/28/20    KNAPP ELECTRIC, INC.                
                                                            GC-03             974                  12/18/19   01/06/20    BELLOWS CONSTRUCTION                
                                                            GC-07A            305                  11/17/20   02/16/21    BELLOWS CONSTRUCTION                
 
19-1886   Reconstruction               0-005-008  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0282   Reconstruction               0-005-009  09/23/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1067   Reconstruction               0-005-010  04/12/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02           8,709                  01/06/23   12/08/23    PAC ASSOC OF OSWEGO INC             
 
22-0549   Reconstruction               0-005-011  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0557FP Reconstruction               0-005-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
93-1088   Reconstruction               0-007-003  05/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1243   Additions and Alterations    0-007-005  10/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1                 0                  08/20/02   11/01/02    Huen New York                       
                                                            E-10           12,394                  03/14/03   03/20/03    Huen New York                       
                                                            E-11           -2,647                  03/14/03   03/20/03    Huen New York                       
                                                            E-12            1,176                  04/08/03   04/17/03    Huen New York                       
                                                            E-13                0                  04/08/03   04/17/03    Huen New York                       
                                                            E-14              420                  05/12/03   05/27/03    Huen New York                       
                                                            E-15            1,453                  05/12/03   05/27/03    Huen New York                       
                                                            E-16                0                  06/12/03   07/11/03    Huen New York                       
                                                            E-17              791                  06/12/03   07/11/03    Huen New York                       
                                                            E-18            1,906                  06/12/03   07/11/03    Huen New York                       
                                                            E-19            4,215                  06/12/03   07/11/03    Huen New York                       
                                                            E-2            10,943                  02/21/03   03/04/03    Huen New York                       
                                                            E-20            1,024                  07/16/03   07/24/03    Huen New York                       
                                                            E-21              271                  07/16/03   07/24/03    Huen New York                       
                                                            E-22            7,897                  08/20/03   08/27/03    Huen New York                       
                                                            E-23            5,547                  11/24/03   01/08/04    Huen New York                       
                                                            E-24            5,089                  11/24/03   03/03/04    Huen New York                       
                                                            E-25            7,414                  11/24/03   01/08/04    Huen New York                       
                                                            E-26           -1,100                  01/26/04   03/05/04    Huen New York                       
                                                            E-27            1,556                  01/26/04   02/04/04    Huen New York                       
                                                            E-28              762                  03/26/04   04/08/04    Huen New York                       
                                                            E-29              671                  03/26/04   04/08/04    Huen New York                       
                                                            E-3             3,621                  02/21/03   03/04/03    Huen New York                       
                                                            E-30              390                  03/26/04   04/08/04    Huen New York                       
                                                            E-31           -8,400                  03/26/04   04/08/04    Huen New York                       
                                                            E-32              649                  03/26/04   04/08/04    Huen New York                       
                                                            E-33            2,440                  03/26/04   04/08/04    Huen New York                       
                                                            E-34            1,314                  03/26/04   04/08/04    Huen New York                       
                                                            E-35              783                  03/26/04   04/08/04    Huen New York                       
                                                            E-36            2,587                  03/26/04   04/08/04    Huen New York                       
                                                            E-37              427                  03/26/04   04/08/04    Huen New York                       
                                                            E-38            1,327                  06/17/04   06/22/04    Huen New York                       
                                                            E-38            1,327                  06/28/04   07/27/04    Huen New York                       
                                                            E-39              437                  06/28/04   07/27/04    Huen New York                       
                                                            E-4           -25,204                  02/28/03   03/06/03    Huen New York                       
                                                            E-40            1,768                  06/28/04   07/27/04    Huen New York                       
                                                            E-41            1,141                  06/28/04   07/27/04    Huen New York                       
                                                            E-42            6,482                  06/28/04   07/27/04    Huen New York                       
                                                            E-43           -3,030                  11/23/05   02/14/06    Huen new York                       
                                                            E-44             -694                  11/23/05   02/14/06    Huen New York                       
                                                            E-45              516                  12/10/04   12/23/04    Huen New York                       
                                                            E-46            2,661                  12/10/04   12/23/04    Huen New York                       
                                                            E-47            2,233                  11/03/04   12/21/04    Huen New York                       
                                                            E-48            1,720                  12/10/04   12/23/04    Huen New York                       
                                                            E-49            4,118                  12/10/04   12/23/04    Huen New York                       
                                                            E-5                 0                  02/28/03   03/06/03    Huen New York                       
                                                            E-50            1,933                  12/10/04   12/23/04    Huen New York                       
                                                            E-51            2,410                  12/10/04   12/23/04    Huen New York                       
                                                            E-52            2,819                  12/10/04   12/23/04    Huen New York                       
                                                            E-53            1,271                  12/10/04   12/23/04    Huen New York                       
                                                            E-54            3,161                  12/10/04   12/23/04    Huen New York                       
                                                            E-55            2,977                  12/10/04   12/23/04    Huen New York                       
                                                            E-56           11,209                  12/10/04   12/23/04    Huen New York                       
                                                            E-57            2,229                  11/23/05   08/23/06    Huen New York                       
                                                            E-58            1,271                  04/15/05   04/26/05    Huen New York                       
                                                            E-6                 0                  02/28/03   03/06/03    Huen New York                       
                                                            E-60           -5,570                  11/23/05   08/23/06    Huen new york                       
                                                            E-61            4,923                  11/23/05   08/23/06    Huen New York                       
                                                            E-62           19,367                  11/23/05   08/23/06    Huen new York                       
                                                            E-63           11,209                  08/14/06   08/16/06    Huen New York Inc.                  
                                                            E-64            3,600                  08/14/06   08/16/06    Huen New York Inc.                  
                                                            E-7                 0                  02/28/03   03/06/03    Huen New York                       
                                                            E-8                 0                  02/28/03   03/06/03    Huen New York                       
                                                            E-9                 0                  02/28/03   03/06/03    Huen New York                       
                                                            E59             3,698                  07/14/05   07/21/05    Huen new York                       
                                                            GC-1           60,416                  08/20/02   11/01/02    Northland Associates                
                                                            GC-10          15,600                  03/14/03   03/20/03    Northland Associates                
                                                            GC-11           6,698                  04/28/03   05/05/03    Northland Associates                
                                                            GC-12           1,357                  04/08/03   04/21/03    Northland Associates                
                                                            GC-13           6,980                  04/28/03   05/05/03    Northland Associates                
                                                            GC-14         -43,265                  04/28/03   05/05/03    Northland Associates                
                                                            GC-15          35,878                  05/12/03   05/27/03    Northland Associates                
                                                            GC-16         -24,000                  05/12/03   05/27/03    Northland Associates                
                                                            GC-17           6,780                  06/12/03   07/11/03    Northland Associates                
                                                            GC-18           2,296                  07/16/03   07/24/03    Northland Associates                
                                                            GC-19           4,726                  09/30/03   10/07/03    Northland Associates                
                                                            GC-2           91,375                  08/20/02   11/01/02    Northland Associates                
                                                            GC-20          10,663                  09/30/03   10/07/03    Northland Associates                
                                                            GC-21           5,521           5,521  01/26/04   03/05/04    Northland Associates                
                                                            GC-22           2,906                  01/26/04   03/05/04    Northland Associates                
                                                            GC-23          99,843                  01/26/04   03/05/04    Northland Associates                
                                                            GC-24          13,651                  03/03/04   04/07/04    Northland Associates                
                                                            GC-25           2,923                  03/03/04   04/07/04    Northland Associates                
                                                            GC-26           3,773                  03/03/04   04/07/04    Northland Associates                
                                                            GC-27             294                  03/03/04   04/07/04    Northland Associates                
                                                            GC-28             671                  03/03/04   04/07/04    Northland Associates                
                                                            GC-29           1,150                  03/03/04   04/07/04    Northland Associates                
                                                            GC-3                0                  02/21/03   03/04/03    Northland Associates                
                                                            GC-30           2,010                  03/03/04   04/07/04    Northland Associates                
                                                            GC-31          -6,053                  03/03/04   04/07/04    Northland Associates                
                                                            GC-32          -3,013                  03/03/04   04/07/04    Northland Associates                
                                                            GC-33          18,444                  03/26/04   04/07/04    Northland Associates                
                                                            GC-34             584                  03/26/04   04/07/04    Northland Associates                
                                                            GC-35          16,717                  03/26/04   04/07/04    Northland Associates                
                                                            GC-36             521                  03/26/04   04/07/04    Northland Associates                
                                                            GC-37           5,381                  03/26/04   04/07/04    Northland Associates                
                                                            GC-38           7,786                  03/26/04   04/07/04    Northland Associates                
                                                            GC-39           5,578                  03/26/04   04/07/04    Northland Associates                
                                                            GC-4            3,710                  02/21/03   03/04/03    Northland Associates                
                                                            GC-40          -7,069                  03/26/04   04/07/04    Northland Associates                
                                                            GC-41          -3,789                  03/26/04   04/07/04    Northland Associates                
                                                            GC-42          -4,820                  03/26/04   04/07/04    Northland Associates                
                                                            GC-43           5,335                  04/26/04   05/11/04    Northland Associates                
                                                            GC-44             982                  04/26/04   05/11/04    Northland Associates                
                                                            GC-45             706                  04/26/04   05/11/04    Northland Associates                
                                                            GC-46             857                  04/26/04   05/11/04    Northland Associates                
                                                            GC-47           3,263                  04/26/04   05/11/04    Northland Associates                
                                                            GC-48           2,902                  04/26/04   05/11/04    Northland Associates                
                                                            GC-49           2,800                  06/17/04   06/22/04    Northland Associates                
                                                            GC-5           11,208                  02/21/03   03/04/03    Northland Associates                
                                                            GC-50           1,499                  06/17/04   06/22/04    Northland Associates                
                                                            GC-51           8,996                  06/17/04   06/22/04    Northland Associates                
                                                            GC-52          10,444                  06/17/04   06/22/04    Northland Associates                
                                                            GC-53           8,456                  09/08/04   09/24/04    Northland Associates                
                                                            GC-54          -4,786                  09/08/04   09/24/04    Northland Associates                
                                                            GC-55           4,717                  09/08/04   09/24/04    Northland Associates                
                                                            GC-56          10,328                  09/08/04   09/24/04    Northland Associates                
                                                            GC-57             694                  09/08/04   09/24/04    Northland Associates                
                                                            GC-58           1,412                  08/21/06   09/07/06    Northland Associates, Inc.          
                                                            GC-59           2,484                  09/08/04   09/24/04    Northland Associates                
                                                            GC-6           17,929                  02/21/03   03/04/03    Northland Associates                
                                                            GC-60           6,495                  09/08/04   09/24/04    Northland Associates                
                                                            GC-61             785                  09/08/04   09/24/04    Northland Associates                
                                                            GC-62           5,359                  09/08/04   09/24/04    Northland Associates                
                                                            GC-63          20,240                  09/08/04   09/24/04    Northland Associates                
                                                            GC-64           7,780                  09/08/04   09/24/04    Northland Associates                
                                                            GC-65             794                  10/13/04   10/18/04    Northland Associates                
                                                            GC-66             940                  10/13/04   10/18/04    Northland Associates                
                                                            GC-67           2,140                  10/13/04   10/18/04    Northland Associates                
                                                            GC-68           4,937                  10/13/04   10/18/04    Northland Associates                
                                                            GC-69           1,091                  11/08/04   12/06/04    Northland Associates                
                                                            GC-7            2,544                  02/21/03   03/04/03    Northland Associates                
                                                            GC-70           3,380                  12/10/04   12/23/04    Northland Associates                
                                                            GC-71           1,350                  12/10/04   12/23/04    Northland Associates                
                                                            GC-72             849                  12/10/04   12/23/04    Northland Associates                
                                                            GC-73           1,812                  04/15/05   04/26/05    Northland Associates                
                                                            GC-74           2,280                  04/15/05   04/26/05    Northland Associates                
                                                            GC-75           1,670                  04/15/05   04/26/05    Northland Associates                
                                                            GC-76           4,116                  04/15/05   04/26/05    Northland Associates                
                                                            GC-77          -7,328                  04/15/05   04/26/05    Northland Associates                
                                                            GC-78           5,036                  04/15/05   04/26/05    Northland Associates                
                                                            GC-79           4,869                  04/15/05   04/26/05    Northland Associates                
                                                            GC-8           10,891                  03/14/03   03/20/03    Northland Associates                
                                                            GC-80           3,312                  04/15/05   04/26/05    Northland Associates                
                                                            GC-81           6,001                  08/14/06   08/16/06    Northland Associates, Inc.          
                                                            GC-82           3,971                  07/14/05   07/21/05    Northland Associates                
                                                            GC-83           3,193                  07/14/05   07/21/05    Northland Associates                
                                                            GC-84           4,928                  07/14/05   07/21/05    Northland Associates                
                                                            GC-85         -17,237                  07/14/05   07/21/05    Northland Associates                
                                                            GC-86          13,655                  07/14/05   07/21/05    Northland Associates                
                                                            GC-87           5,740                  07/14/05   07/21/05    Northland Associates                
                                                            GC-88          -9,519                  09/30/05   10/13/05    Northland Associates                
                                                            GC-89           6,227                  09/30/05   10/13/05    Northland Associates                
                                                            GC-9            2,647                  03/14/03   03/20/03    Northland Associates                
                                                            GC-90          -1,412                  09/30/05   10/14/05    Northland Associates                
                                                            GC-91           5,000                  09/30/05   10/13/05    Northland Associates                
                                                            GC-92             814                  09/30/05   08/16/06    Northland Associates                
                                                            GC-93           4,923                  08/14/06   08/16/06    Northland ASsociates, Inc.          
                                                            GC-94          18,165                  08/14/06   08/16/06    Northland Associates, INc.          
                                                            GC-95             250                  08/14/06   08/16/06    Northland Associates, Inc.          
                                                            H-1                 0                  06/13/02   11/05/02    JW Danforth                         
                                                            H-10            2,639                  12/08/03   12/09/03    JW Danforth                         
                                                            H-11           16,061                  01/26/04   03/03/04    JW Danforth                         
                                                            H-12              518                  04/26/04   05/11/04    JW Danforth                         
                                                            H-13            6,883                  04/26/04   05/11/04    JW Danforth                         
                                                            H-14              273                  04/26/04   05/11/04    JW Danforth                         
                                                            H-15            8,002                  05/17/04   05/26/04    JW Danforth                         
                                                            H-16            2,916                  05/17/04   05/26/04    JW Danforth                         
                                                            H-17              865                  05/17/04   05/26/04    JW Danforth                         
                                                            H-18              916                  05/17/04   05/26/04    JW Danforth                         
                                                            H-19              656                  05/17/04   05/26/04    JW Danforth                         
                                                            H-2             1,226                  06/13/02   10/22/03    JW Danforth                         
                                                            H-20              609                  05/17/04   05/26/04    JW Danforth                         
                                                            H-21              347                  05/17/04   05/26/04    JW Danforth                         
                                                            H-22           -1,343                  10/13/04   10/18/04    JW Danforth                         
                                                            H-23           -3,337                  10/24/05   10/27/05    John Danforth                       
                                                            H-24            7,113                  10/13/04   10/18/04    JW Danforth                         
                                                            H-25            7,258                  10/13/04   10/18/04    JW Danforth                         
                                                            H-26            1,155                  12/10/04   12/23/04    JW Danforth                         
                                                            H-27           25,400                  12/10/04   12/23/04    JW Danforth                         
                                                            H-28            1,332                  12/10/04   12/23/04    JW Danforth                         
                                                            H-29            9,778                  10/24/05   09/07/06    John danforth                       
                                                            H-3             2,537                  06/13/02   11/05/02    JW Danforth                         
                                                            H-30            6,515                  10/24/05   10/27/05    John danforth                       
                                                            H-31            9,846                  10/24/05   09/07/06    John Danforth                       
                                                            H-32            4,235                  10/24/05   09/07/06    John Danforth                       
                                                            H-33            9,769                  08/14/06   08/16/06    John W. Danforth Co.                
                                                            H-4            10,340                  02/21/03   10/22/03    JW Danforth                         
                                                            H-5             1,271                  07/16/03   07/24/03    JW Danforth                         
                                                            H-6               630                  02/28/03   03/06/03    JW Danforth                         
                                                            H-7             2,928                  05/12/03   05/27/03    JW Danforth                         
                                                            H-8            79,100                  07/16/03   07/24/03    JW Danforth                         
                                                            H-9               630                  10/21/03   10/23/03    JW Danforth                         
                                                            P-1             3,702                  06/13/02   11/05/02    Siracusa Mech.                      
                                                            P-10            1,265                  05/12/03   05/27/03    Siracusa Mech.                      
                                                            P-11            1,346                  05/12/03   05/27/03    Siracusa Mech.                      
                                                            P-12              800                  05/12/03   05/27/03    Siracusa Mech.                      
                                                            P-13            1,085                  07/16/03   07/24/03    Siracusa Mech.                      
                                                            P-14            7,340                  11/24/03   01/08/04    Siracusa Mech.                      
                                                            P-15            6,538                  11/24/03   01/08/04    Siracusa Mech.                      
                                                            P-16            7,570                  01/26/04   02/04/04    Siracusa Mech.                      
                                                            P-17            2,700                  08/13/04   09/23/04    Siracusa Mech.                      
                                                            P-18              791                  08/13/04   09/23/04    Siracusa Mech.                      
                                                            P-19            1,100                  08/13/04   09/23/04    Siracusa Mech.                      
                                                            P-2             5,498                  06/13/02   11/05/02    Siracusa Mech.                      
                                                            P-20              644                  08/13/04   09/23/04    Siracusa Mech.                      
                                                            P-21              954                  08/13/04   09/23/04    Siracusa Mech.                      
                                                            P-22            1,840                  08/13/04   09/23/04    Siracusa Mech.                      
                                                            P-23             -782                  11/03/04   12/21/04    Siracusa Mech.                      
                                                            P-24            9,938                  12/10/04   12/23/04    Siracusa Mech.                      
                                                            P-25              500                  10/24/05   10/27/05    Siracusa Mechanical                 
                                                            P-26            8,402                  04/15/05   04/26/05    siracusa Mechanical                 
                                                            P-27           14,624                  04/15/05   04/26/05    Siracusa Mechanical                 
                                                            P-28             -905                  10/24/05   10/27/05    siracusa Mechanical                 
                                                            P-29            1,500                  08/14/06   08/16/06    Siracusa Mechanical Inc.            
                                                            P-3            -7,917                  02/21/03   03/04/03    Siracusa Mech.                      
                                                            P-4             3,266                  03/14/03   03/20/03    Siracusa Mech.                      
                                                            P-5             6,210                  03/14/03   03/20/03    Siracusa Mech.                      
                                                            P-6             3,685                  06/12/03   07/11/03    Siracusa Mech.                      
                                                            P-7            17,089                  03/14/03   03/18/03    Siracusa Mech.                      
                                                            P-8             6,121                  03/13/03   03/20/03    Siracusa Mech.                      
                                                            P-9            33,299                  04/08/03   04/17/03    Siracusa Mech.                      
                                                            S-1                 0                  06/13/02   11/05/02    Robert H. Law                       
                                                            S-2                 0                  06/13/02   11/04/02    Robert H. Law                       
                                                            S-3            15,000                  02/21/03   03/04/03    Robert H. Law                       
                                                            S-4                 0                  11/01/02   01/08/03    Robert H. Law                       
                                                            S-5            -6,187                  02/28/03   03/06/03    Robert H. Law                       
                                                            S-6             2,573                  02/28/03   03/06/03    Robert H. Law                       
                                                            S-7            -4,874                  11/23/05   02/14/06    Robert Law                          
                                                            T-1                 0                  08/20/03   08/27/03    D. Hillman & Sons                   
                                                            T-2                 0                  03/03/04   04/07/04    D. Hillman & Sons                   
                                                            T-3                 0                  04/26/04   05/11/04    D. Hillman & Sons                   
                                                            T-4             5,739                  08/13/04   09/23/04    D. Hillman & Sons                   
                                                            T-5               -93                  04/15/05   04/26/05    D hillman and Son                   
                                                            T-6             1,407                  04/15/05   04/26/05    D Hillman and Sons                  
 
04-1053   Reconstruction               0-007-006  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            B-1             2,837                  03/28/07   03/08/08    ALL STAR BLEACHERS, INC             
                                                            B-2            -1,000                  03/28/07   04/03/07    All State Bleachers                 
                                                            E-1             8,706                  10/24/05   05/09/07    Patricia Electric                   
                                                            E-10           13,072                  11/13/06   05/09/07    Patricia Electric                   
                                                            E-12           15,894                  11/24/06   01/30/07    Patricia Electric                   
                                                            E-13            5,080                  11/24/06   05/09/07    Patricia Electric                   
                                                            E-15           13,854                  11/24/06   05/09/07    Patricia Electric                   
                                                            E-16            5,525                  01/22/07   08/15/07    Patricia Electric                   
                                                            E-18             -500                  07/23/07   08/28/07    Patricia Electric                   
                                                            E-2             9,371                  09/22/06   05/09/07    Patricia Electric                   
                                                            E-4             8,974                  09/22/06   05/09/07    Patricia Electric                   
                                                            E-9             8,288                  09/22/06   01/30/07    Patricia Electric                   
                                                            GC-1            5,381                  10/16/06   11/03/06    Bette Cring                         
                                                            GC-10           7,610                  10/16/06   11/03/06    Bette Cring                         
                                                            GC-13          -3,715                  08/08/07   08/20/07    BETTE & CRING, LLC                  
                                                            GC-14           2,852                  08/09/07   08/20/07    BETTE & CRING, LLC                  
                                                            GC-17           5,889                  11/23/07   12/27/07    Bette & Cring LLC                   
                                                            GC-2            2,220                  10/16/06   11/03/06    Bette Cring                         
                                                            GC-3            5,841                  10/16/06   11/03/06    Bette Cring                         
                                                            GC-4             -800                  10/16/06   11/03/06    Bette Cring                         
                                                            GC-9           12,717                  10/16/06   11/03/06    Bette Cring                         
                                                            H-3                 0                  07/23/07   08/28/07    M and N Plumbing Heating            
                                                            H-4            -7,239                  07/23/07   01/24/08    M and Plumbing Heating              
                                                            P-1             1,477                  11/13/06   01/30/07    Burns Brothers Contractors          
                                                            P-3           -23,102                  01/25/08   04/09/08    BURNS BROS CONTRACTORS              
                                                            P-4               612                  07/23/07   08/28/07    Burns Brothers                      
                                                            S-1             6,271                  08/22/06   08/24/06    Robert Law                          
                                                            S-11           48,723                  11/14/06   12/27/06    Robert Law                          
                                                            S-12           11,607                  11/14/06   01/30/07    Robert Law                          
                                                            S-13           13,551                  11/14/06   12/27/06    Robert law                          
                                                            S-14            9,617                  11/14/06   12/27/06    Robert Law                          
                                                            S-16           14,661                  11/24/06   01/09/07    Robert Law                          
                                                            S-19            2,205                  03/28/07   04/03/07    Robert Law                          
                                                            S-2            33,102                  08/22/06   08/24/06    Robert Law                          
                                                            S-24          -16,509                  01/28/08   03/08/08    ROBERT H. LAW                       
                                                            S-25            5,444                  01/28/08   03/08/08    ROBERT H. LAW                       
                                                            S-3             1,571                  03/10/06   06/02/06    Rbert law                           
                                                            S-4             2,345                  11/16/06   01/09/07    Robert Law                          
                                                            S-5             6,810                  11/17/06   01/09/07    Robert Law                          
                                                            S-6             2,500                  11/14/00   01/09/07    Robert Law                          
                                                            S-7            14,015                  11/14/06   12/27/06    Robert Law                          
                                                            S-8            97,897                  11/14/06   12/27/06    Robert Law                          
 
07-2096   Reconstruction               0-007-007  12/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -12,320                  11/09/09   03/29/12    SUMMIT ENVIRONMENTAL SERVICES INC   
 
11-0001   Reconstruction               0-007-008  07/20/11  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1459   Reconstruction               0-007-009  02/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            HS AE-1        90,250                  06/20/16   09/30/16    Facilties Equipment and Service, Inc
                                                            HS CC-1         7,850                  10/17/16   11/04/16    Wood, Etc.                          
                                                            HS E-1              0                  06/20/16   01/16/18    Kaplan-Schmidt Electric Inc.        
                                                            HS E-2              0                  08/24/16   10/05/16    Kaplan-Schmidt Electric Inc.        
                                                            HS E-3              0                  08/24/16   10/05/16    Kaplan-Schmidt Electric Inc.        
                                                            HS E-4         -1,946                  11/07/16   11/28/16    Kaplan-Schmidt Electric, Inc.       
                                                            HS E-5          1,172                  11/07/16   11/28/16    Kaplan-Schmidt Electric, Inc.       
                                                            HS E-6        198,848                  01/16/18   06/04/19    Kaplan-Schmidt Electric, Inc.       
                                                            HS E-7          3,192                  01/03/17   08/23/17    Kaplan-Schmidt Electric, Inc.       
                                                            HS FC-1        20,379                  10/17/16   11/04/16    Western NY Flooring                 
                                                            HS FC-2        17,672                  01/03/17   01/06/17    Western NY Flooring                 
                                                            HS GC-1             0                  06/20/16   09/30/16    PAC & Associates of Oswego, Inc.    
                                                            HS GC-10          202                  01/03/17   01/06/17    PAC Associates of Oswego, Inc.      
                                                            HS GC-2             0                  06/20/16   09/30/16    PAC Associates of Oswego, Inc.      
                                                            HS GC-3        13,000                  08/24/16   10/05/16    PAC Associates of Oswego, Inc.      
                                                            HS GC-5        16,403                  10/17/16   11/02/16    PAC Associates of Oswego, Inc.      
                                                            HS GC-6             0                  10/17/16   11/04/16    PAC Associates of Oswego, Inc.      
                                                            HS GC-7         8,259                  10/17/16   11/04/16    PAC Associates of Oswego, Inc.      
                                                            HS GC-8         5,883                  11/07/16   11/28/16    PAC Associates of Oswego, Inc.      
                                                            HS GC-9         3,318                  11/07/16   11/28/16    PAC Associates of Oswego, Inc.      
                                                            HS H-1              0                  08/24/16   10/28/16    HMI Mechanical                      
                                                            HS H-2              0                  08/24/16   10/28/16    HMI Mechanical                      
                                                            HS H-3              0                  08/24/16   10/28/16    HMI Mechanical                      
                                                            HS H-4        -13,500                  08/24/16   10/28/16    HMI Mechanical                      
                                                            HS H-5        -19,999                  01/03/17   08/23/17    HMI Mechanical                      
                                                            HS P-1         -3,198                  08/24/16   10/05/16    Joy Process Mechanical              
                                                            HS P-2              0                  08/24/16   10/05/16    Joy Process Mechanical              
                                                            HS P-3              0                  10/17/16   11/04/16    Joy Process Mechanical              
                                                            HS P-4              0                  11/07/16   11/28/16    Joy Process Mechanical              
                                                            HS P-5        -13,277                  01/03/17   08/23/17    Joy Process Mechanical              
                                                            HSGC-4              0                  10/17/16   11/02/16    PAC Associates of Oswego, Inc.      
 
18-0289   Reconstruction               0-007-010  06/19/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2006   Reconstruction               0-007-011  09/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-07             0                  09/13/19   09/16/19    KNAPP ELECTRIC, INC.                
                                                            AAGC-03             0                  09/13/19   09/18/19    BELLOWS CONSTRUCTION                
                                                            AAGC-04             0                  09/13/19   10/01/19    BELLOWS CONSTRUCTION                
                                                            AAGC-08             0                  10/22/19   10/25/19    BELLOWS CONSTRUCTION                
                                                            EC-06             624                  06/30/20   07/28/20    KNAPP ELECTRIC, INC.                
                                                            GC-01          -1,074                  09/13/19   09/18/19    BELLOWS CONSTRUCTION                
                                                            GC-06          19,668                  07/15/20   09/08/20    BELLOWS CONSTRUCTION                
                                                            GC-07D            305                  11/17/20   02/16/21    BELLOWS CONSTRUCTION                
 
19-1885   Reconstruction               0-007-012  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1068   Reconstruction               0-007-013  04/12/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01         -21,150                  09/05/23   01/03/24    LANDMARK ENTERPRISES                
 
22-0550   Reconstruction               0-007-014  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0913   Reconstruction               0-007-016  12/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Genesee Middle School:
95-1708   Reconstruction               0-009-002  08/21/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1054   Reconstruction               0-009-003  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-1                 0                  07/23/07   08/28/07    M and N Plumbing                    
                                                            S-20            3,920                  03/28/07   04/03/07    Robert Law                          
 
07-2097   Reconstruction               0-009-004  12/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0603   Reconstruction               0-009-005  08/03/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            WG E-1         -1,127                  03/07/16   03/24/16    Kaplan-Schmidt Electric Inc.        
                                                            WGM P-1       -15,530                  02/22/16   05/10/16    Joy Process Mechanical              
                                                            WGM P-2          -513                  08/24/16   11/21/16    Joy Process Mechanical              
                                                            WGM P-3             0                  08/24/16   11/08/17    Joy Process Mechanical              
                                                            WGM S-1        45,143                  04/11/16   12/28/16    Landmark Enterprises                
                                                            WGM S-2       -11,000                  08/24/16   11/21/16    Landmark Enterprises                
                                                            WGM S-3         7,063                  08/24/16   11/21/16    Landmark Enterprises                
                                                            WGMS E-2       -5,285                  03/07/16   03/24/16    Kaplan-Schmidt Electric Inc.        
                                                            WGMS E-3            0                  06/20/16   07/08/16    Kaplan-Schmidt Electric Inc.        
                                                            WGMS E-4       11,045                  06/20/16   07/08/16    Kaplan-Schmidt Electric Inc.        
                                                            WGMS E-5            0                  08/24/16   11/08/17    Kaplan-Schmidt Electric, Inc.       
                                                            WGMS GC1         -175                  02/22/16   05/10/16    PAC & Associates of Oswego, Inc.    
                                                            WGMS GC2       -1,830                  02/22/16   05/10/16    PAC & Associates of Oswego, Inc.    
                                                            WGMS GC4       -1,042                  06/20/16   07/08/16    PAC & Associates of Oswego, Inc.    
                                                            WGMS H-1       -2,806                  02/22/16   05/10/16    D.W. Crew Mechanicls Inc.           
                                                            WGMS P-4            0              11  01/03/17   01/06/17    Joy Process Mechanical              
                                                            WGMSAE-1         -185                  11/07/16   11/16/16    Facilities Equipment & Service, Inc.
                                                            WGMSGC-5            0                  08/24/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            WGMSGC-6         -594                  08/24/16   11/21/16    PAC & Associates of Oswego, Inc.    
                                                            WGMSGC-7        1,282                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            WGMSGC-8            0                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            WGMSGC-9            0                  10/17/16   11/01/16    PAC & Associates of Oswego, Inc.    
                                                            WGMSGC3        -1,214                  06/20/16   07/08/16    PAC & Associates of Oswego, Inc.    
 
17-2007   Reconstruction               0-009-006  09/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-06             0                  09/13/19   09/16/19    KNAPP ELECTRIC, INC.                
                                                            AAGC-02             0                  09/13/19   09/18/19    BELLOWS CONSTRUCTION                
                                                            EC-07             601                  06/30/20   07/28/20    KNAPP ELECTRIC, INC.                
                                                            EC-10             433                  07/15/20   09/02/20    KNAPP ELECTRIC, INC.                
                                                            GC-02            -348                  10/22/19   10/25/19    BELLOWS CONSTRUCTION                
                                                            GC-07B            305                  11/17/20   02/10/21    BELLOWS CONSTRUCTION                
 
19-1884   Reconstruction               0-009-007  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0560FP Reconstruction               0-009-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stonehedge Elementary:
92-0654   Reconstruction               0-010-002  03/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0472   Reconstruction               0-010-003  12/31/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0652   Reconstruction               0-010-004  03/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1055   Reconstruction               0-010-005  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-11            7,776                  11/24/06   01/30/07    Patricia Electric                   
                                                            E-17            8,017                  01/22/07   01/24/08    patricia Electric                   
                                                            E-7               232                  09/22/06   12/18/06    Patricia Electric                   
                                                            GC-11          23,751                  12/13/06   12/28/06    Bette Cring                         
                                                            P-2            -5,726                  03/28/07   08/15/07    Burns Brothers                      
                                                            R-2             1,830                  12/28/06   01/23/07    J and Installations                 
                                                            R-3             7,585                  02/14/08   03/08/08    J & B INSTALLATIONS INC             
                                                            S-10           28,764                  11/14/06   12/27/06    Robert Law                          
                                                            S-17           26,215                  11/24/06   01/12/07    Robert Law                          
 
07-2098   Reconstruction               0-010-006  12/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            -5,300                  11/09/09   12/08/09    SUMMIT ENVIRONMENTAL SERVICES INC   
 
11-0002   Reconstruction               0-010-007  07/20/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1483   Reconstruction               0-010-008  10/29/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            AE-1           16,437                  10/26/15   11/19/15    Facilities Equipment & Service      
                                                            E-01           -3,000                  09/08/15   09/17/15    Kaplan Schmidt Electric Inc.        
                                                            E-05                0                  09/08/15   09/17/15    Kaplan Schmidt Electric Inc.        
                                                            E-06            2,369                  09/08/15   09/17/15    Kaplan Schmidt Electric Inc.        
                                                            E-10              829                  09/08/15   09/17/15    Kaplan Schmidt Electric Inc.        
                                                            E-12            7,016                  10/26/15   11/19/15    Kaplan-Schmidt Electric Inc.        
                                                            E-14              850                  10/26/15   11/19/15    Kaplan-Schmidt Electric Inc.        
                                                            E-15            1,289                  12/29/15   01/12/16    Kaplan-Schmidt Electric Inc.        
                                                            E-16           18,219                  12/29/15   01/12/16    Kaplan-Schmidt Electric Inc.        
                                                            E-17            5,975                  12/29/15   01/12/16    Kaplan-Schmidt Electric Inc.        
                                                            E-18            3,891                  12/29/15   01/12/16    Kaplan-Schmidt Electric Inc.        
                                                            GC-10           3,937                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-11               0                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-12           4,396                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-13           4,592                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-14             723                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-17           3,703                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-18           1,404                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-19           6,608                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-20               0                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-21             898                  10/26/15   11/19/15    PAC Associates of Oswego, Inc       
                                                            GC-23               0                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-24               0                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-26           9,581                  12/29/15   01/12/16    PAC Associates of Oswego, Inc.      
                                                            GC-28           1,573                  12/29/15   01/12/16    PAC Associates of Oswego, Inc.      
                                                            GC-3            3,491                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-30               0                  12/29/15   01/12/16    PAC Associates of Oswego, Inc.      
                                                            GC-4           20,784                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-5           10,051                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-6           -4,212                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            GC-7           22,817                  09/08/15   09/17/15    PAC Associates of Oswego Inc.       
                                                            H-10           11,886                  12/29/15   01/12/16    Joy Process Mechanical              
                                                            H-11            1,396                  12/29/15   01/12/16    Joy Process Mechanical              
                                                            H-7             2,906                  10/26/15   11/19/15    Joy Process Mechanical              
                                                            HC-02          13,244                  09/08/15   09/18/15    Joy Process Mechanical              
                                                            HC-03          -2,500                  09/08/15   09/18/15    Joy Process Mechanical              
                                                            HC-4            2,009                  10/26/15   11/19/15    Joy Process Mechanical              
                                                            HC-5              994                  10/26/15   11/19/15    Joy Process Mechanical              
                                                            HC-6            5,693                  10/26/15   11/19/15    Joy Process Mechanical              
                                                            P-2             3,851                  09/08/15   09/18/15    C&S Technical Rescources Inc.       
                                                            P-3                 0                  10/26/15   11/19/15    C&S Technical Resources, Inc.       
                                                            P-4                 0                  10/26/15   11/19/15    C&S Technical Resources, Inc.       
                                                            P-5                 0                  10/26/15   11/19/15    C&S Technical Resources, Inc.       
                                                            P-6            -1,924                  02/22/16   03/01/16    C&S Technical Resources, Inc.       
 
17-2008   Reconstruction               0-010-009  09/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-04             0                  09/13/19   09/16/19    KNAPP ELECTRIC, INC.                
                                                            AAEC-08             0                  10/22/19   10/25/19    KNAPP ELECTRIC, INC.                
                                                            AAEC-10             0                  12/18/19   01/07/20    KNAPP ELECTRIC, INC.                
                                                            AAGC-01             0                  09/13/19   09/18/19    BELLOWS CONSTRUCTION                
                                                            AAGC-10             0                  10/22/19   10/25/19    BELLOWS CONSTRUCTION                
                                                            AAGC-14             0                  10/22/19     /  /      BELLOWS CONSTRUCTION                
                                                            AAHC-01             0                  12/18/19   12/31/19    ERIE MECHANICAL CONTRACTORS         
                                                            EC-01          10,099                  12/18/19   01/07/20    KNAPP ELECTRIC, INC.                
                                                            EC-09           1,271                  06/30/20   07/28/20    KNAPP ELECTRIC, INC.                
                                                            GC-04           3,209                  06/30/20   07/27/20    BELLOWS CONSTRUCTION                
                                                            GC-05           1,401                  06/30/20   07/27/20    BELLOWS CONSTRUCTION                
                                                            GC-07G            611                  11/17/20   02/16/21    BELLOWS CONSTRUCTION                
                                                            HC-01          11,163                  12/18/19   12/31/19    ERIE MECHANICAL CONTRACTORS         
 
19-1883   Reconstruction               0-010-010  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0551   Reconstruction               0-010-011  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0562FP Reconstruction               0-010-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Camillus Middle School:
91-1600   Reconstruction               0-012-002  07/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0192   Additions and Alterations    0-012-004  11/05/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1056   Reconstruction               0-012-005  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-8               220                  09/22/06   12/18/06    Patricia electric                   
                                                            GC-12          11,067                  11/13/06   12/27/06    Bette & Cring, LLC                  
                                                            H-2                 0                  07/23/07   08/28/07    M and N Plumbing Heating            
                                                            R-1           -10,400                  02/14/08   03/08/08    J & B INSTALLATIONS INC             
                                                            S-15           19,868                  07/23/07   08/20/07    Robert Law                          
                                                            S-18           40,695                  11/24/06   01/12/07    Robert Law                          
                                                            S-9            31,200                  11/13/06   12/27/06    Robert Law                          
 
07-2099   Reconstruction               0-012-006  12/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            -3,380                  11/09/09   12/08/09    SUMMIT ENVIRONMENTAL SERVICES INC   
 
13-1484   Reconstruction               0-012-007  10/29/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-03            2,815                  09/08/15   09/18/15    Kaplan Schmidt Electric Inc.        
                                                            E-04            7,052                  09/08/15   09/18/15    Kaplan Schmidt Electric Inc.        
                                                            E-07            1,282                  09/08/15   09/18/15    Kaplan Schmidt Electric Inc.        
                                                            E-08              787                  09/08/15   09/18/15    Kaplan Schmidt Electric Inc.        
                                                            E-09              833                  09/08/15   09/18/15    Kaplan Schmidt Electric Inc.        
                                                            E-11          116,000                  09/08/15   09/18/15    Kaplan Schmidt Electric Inc.        
                                                            E-13            4,054                  10/26/15   11/19/15    Kaplan-Schmidt Electric Inc.        
                                                            E-19           -5,052                  12/29/15   01/12/16    Kaplan-Schmidt Electric Inc.        
                                                            GC-01           3,924                  09/08/15   09/18/15    PAC Associates of Oswego Inc.       
                                                            GC-15           4,514                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-16             635                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-2            9,018                  09/08/15   09/18/15    PAC Associates of Oswego Inc.       
                                                            GC-22           1,834                  10/26/15   11/19/15    PAC Associates of Oswego, Inc.      
                                                            GC-25               0                  12/29/15   01/12/16    PAC Associates of Oswego, Inc.      
                                                            GC-27           1,026                  12/29/15   01/12/16    PAC Associates of Oswego, Inc.      
                                                            GC-29               0                  12/29/15   01/12/16    PAC Associates of Oswego, Inc.      
                                                            GC-8              311                  09/08/15   09/18/15    PAC Associates of Oswego Inc.       
                                                            GC-9            1,130                  09/08/15   09/18/15    PAC Associates of Oswego Inc.       
                                                            H-8               556                  12/29/15   01/12/16    Joy Process Mechanical              
                                                            H-9             5,804                  12/29/15   01/12/16    Joy Process Mechanical              
                                                            HC-01          14,183                  09/08/15   09/18/15    Joy Process Mechanical              
                                                            S-1            11,803                  09/08/15   09/18/15    Landmark Enterprises                
                                                            S-2            22,741                  10/26/15     /  /      Landmark Enterprises                
 
17-2009   Reconstruction               0-012-008  09/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC-05             0                  09/13/19   09/16/19    KNAPP ELECTRIC, INC.                
                                                            AAGC-06             0                  09/13/19   09/20/19    BELLOWS CONSTRUCTION                
                                                            EC-08             601                  06/30/20   07/28/20    KNAPP ELECTRIC, INC.                
                                                            GC-07C            305                  11/17/20   02/10/21    BELLOWS CONSTRUCTION                
 
19-1882   Reconstruction               0-012-009  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1069   Reconstruction               0-012-010  04/12/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           4,281                  01/06/23   12/08/23    PAC ASSOC OF OSWEGO INC             
                                                            GC-03          19,856                  01/06/23   12/08/23    PAC ASSOC OF OSWEGO INC             
                                                            GC-04               0                  01/18/23   12/14/23    PAC ASSOC OF OSWEGO INC             
                                                            GC-05               0                  03/20/23   12/19/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            HC-01         -14,725                  10/11/22   07/11/23    Erie Mech Contrs                    
 
21-1894   Reconstruction               0-012-011  07/21/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,200                  12/05/22   12/22/23    Bellows Const Specialties LLC       
                                                            GC-02               0                  01/18/23   06/13/23    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-03               0                  01/18/23   12/14/23    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-04          -1,283                  07/17/23     /  /      BELLOWS CONSTRUCTION SPEACIALTIES   
 
02-0561FP Reconstruction               0-012-FP1  12/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
02-0193   Reconstruction               5-001-001  09/04/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            D-1             3,774                  03/14/03   04/21/03    Bianchi Industrial Services         
                                                            D-2             9,805                  04/28/03   05/06/03    Bianchi Industrial services         
                                                            D-3            21,920                  06/25/03   07/11/03    Bianchi Industrial Services         
 

          New Transportation Center:
99-1319   New Construction             5-014-001  05/30/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10               -422                  10/16/01   05/22/02    BF Yenny Const.                     
                                                            11            -31,500                  09/20/01   01/15/02    BF Yenny Const.                     
                                                            12              2,520                  09/20/01   01/15/02    BF Yenny Const.                     
                                                            13            -28,403                  11/20/01   05/28/02    BF Yenny Const.                     
                                                            14             -1,000                  11/20/01   05/28/02    BF Yenny Const.                     
                                                            15                500                  11/20/01   05/28/02    BF Yenny Const.                     
                                                            16              4,049                  02/19/02   04/04/02    BF Yenny Const.                     
                                                            2             -17,500                  01/10/01   01/28/02    BF Yenny Const.                     
                                                            3               3,500                  01/10/01   01/09/02    BF Yenny Const.                     
                                                            3               7,442                  09/20/01   01/15/02    Lan-Co Site Development             
                                                            4               2,000                  01/10/01   01/09/02    BF Yenny Const.                     
                                                            4                   0                  10/16/01   05/22/02    Lan-Co Site Development             
                                                            5                   0                  12/07/01   04/05/02    Lan-Co Site Development             
                                                            6               2,763                  12/07/01   04/05/02    Lan-Co Site Development             
                                                            7             -13,135                  12/07/01   04/05/02    Lan-Co Site Development             
                                                            E-6               712                  09/20/01   01/08/02    RC Knapp Elec.                      
                                                            H-3               976                  10/16/01   05/22/02    Airtech Heating                     
                                                            P-3            -1,500                  12/28/01   03/26/02    Siracusa Mech.                      
                                                            P-4            -1,230                  01/23/02   04/01/02    Siracusa Mech.                      
 
00-1834   Reconstruction               5-014-002  10/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1               360                  03/28/02   05/06/02    Myriad Const.                       
                                                            GC-1              442                  03/28/02   05/06/02    RJ Ortlieb                          
                                                            GC-2            3,572                  05/13/02   05/24/02    RJ Ortleib                          
                                                            GC-5            5,778                  11/01/02   01/08/03    RJ Ortlieb                          
                                                            P-1             9,092                  03/28/02     /  /      Burns Bros.                         
 
07-2100   Reconstruction               5-014-003  12/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1485   Reconstruction               5-014-004  10/29/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BusLift1       12,764                  09/08/15   09/18/15    Filtrec Corporation                 
                                                            BusLift2        1,270                  09/08/15   09/18/15    Filtrec corporation                 
                                                            E-02            1,924                  09/08/15   09/18/15    Kaplan Schmidt Electric Inc.        
                                                            P-1            -3,183                  09/08/15   09/18/15    C&S Technical Rescources Inc.       
 
19-1879   Reconstruction               5-014-005  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0552   Reconstruction               5-014-006  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ High School-Old Field:
04-1057   Reconstruction               7-008-001  06/20/05  NO CHANGE ORDERS ON ELECTRONIC FILE

           Existing Concession Stand:
04-1058   Additions and Alterations    7-011-002  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-14            1,266                  11/24/06   01/30/07    Patricia electric                   
                                                            E-6             7,806                  09/22/06   05/09/07    Patricia Electric                   
                                                            GC-16           1,167                  08/08/07   08/20/07    BETTE & CRING, LLC                  
                                                            GC-6            1,191                  10/16/06   11/03/06    Bette Cring                         
                                                            P-5               404                  07/23/07   08/28/07    Burns Brothers                      
 

          Adm. & Tech. Training Cntr.:
96-1720   New Construction             7-013-001  06/27/97  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2101   Reconstruction               7-013-002  12/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1881   Reconstruction               7-013-003  11/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0553   Reconstruction               7-013-004  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Public Restrooms/Storage:
04-1059   New Construction             7-015-001  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-5               527                  09/22/06   12/18/06    Patricia Electric                   
                                                            GC-7            4,051                  10/16/06   12/14/06    Bette Cring                         
 
21-1070   Reconstruction               7-015-002  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0554   Reconstruction               7-015-003  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ HS New Field:
04-1060   New Construction             7-016-001  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3               658                  09/22/06   12/18/06    Patricia Electric                   
                                                            GC-5            3,302                  10/16/06   11/03/06    Bette Cring                         
 
21-1071   Reconstruction               7-016-002  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0555   Reconstruction               7-016-003  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession @ High School:
04-1061   New Construction             7-017-001  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-15             491                  08/08/07   08/20/07    BETTE & CRING, LLC                  
                                                            GC-8            3,938                  12/28/06   01/23/07    Bette Cring                         
 

          Locker Rooms & Storage:
04-1062   New Construction             7-018-001  06/20/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-18             468                  11/23/07   12/27/07    Bette & Cring LLC                   
 
21-1072   Reconstruction               7-018-002  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0556   Reconstruction               7-018-003  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
13-1300   Reconstruction               7-999-001  08/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            15,240                  09/08/15   09/18/15    O'Connell Electric Company Inc.     
                                                            E-2            28,230                  12/29/15   01/12/16    O'Connell Electric Company Inc.     
 

NORTH SYRACUSE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-03-03-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Allen Road Elementary:
93-0483   Reconstruction               0-001-006  01/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0403   Reconstruction               0-001-007  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1703   Reconstruction               0-001-009  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1544   Reconstruction               0-001-011  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1145   Additions and Alterations    0-001-013  06/07/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1173   Reconstruction               0-001-014  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1760   Reconstruction               0-001-015  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0777   Reconstruction               0-001-018  02/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              37,600                  09/21/06   10/19/06    Ab Construction Roofing             
                                                            2               8,300                  09/21/06   10/19/06    Ab Construction Roofing             
                                                            3              26,200                  12/15/06   01/30/07    Ab Construction Roofing             
 
17-2065   Reconstruction               0-001-019  07/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AARC2-01            0                  03/04/21     /  /      GENERAL ROOFING CONTRACTORS         
                                                            AARC2-02            0                  03/04/21   07/07/21    GENERAL ROOFING CONTRACTORS         
                                                            RC2-01         -2,285                  03/04/21   07/07/21    GENERAL ROOFING CONTRACTORS         
                                                            RC2-02         -2,942                  03/04/21   07/07/21    GENERAL ROOFING CONTRACTORS         
 
19-0775   Reconstruction               0-001-020  01/31/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  03/16/21   05/18/21    CONSTRUCTION DESIGN & MANAGEMENT,INC
                                                            GC-02           5,840                  03/16/21   05/05/21    CONSTRUCTION DESIGN & MANAGEMENT,INC
                                                            GC-03          -2,788                  04/19/21   05/25/21    CONSTRUCTION DESIGN & MANAGEMENT,INC
 
20-1118   Reconstruction               0-001-021  09/07/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01               0                  07/17/23     /  /      WCA ROOFING & SHEET METAL           
 
08-1365SC Visual Structural Inspection 0-001-SC1  03/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bear Road Elementary:
93-0484   Reconstruction               0-002-004  01/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0404   Reconstruction               0-002-005  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1232   Reconstruction               0-002-007  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1611   Reconstruction               0-002-008  06/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1244   Reconstruction               0-002-009  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1174   Reconstruction               0-002-010  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1759   Reconstruction               0-002-011  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0778   Reconstruction               0-002-013  02/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -9,371                  09/21/06   10/19/06    Apple Roofing                       
 
19-1019   Reconstruction               0-002-015  03/18/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AARC11-2            0                  05/12/22   03/28/23    Gen Roofing Contrs                  
                                                            AARC11-3            0                  05/12/22   03/28/23    Gen Roofing Contrs                  
                                                            AARC1101            0                  03/01/21   04/20/21    GENERAL ROOFING CONTRACTORS         
                                                            RC-01         110,230                  03/01/21   02/22/23    GENERAL ROOFING CONTRACTORS         
                                                            RC-02          64,000                  05/12/22   03/28/23    Gen Roofg Contrs                    
                                                            RC-03          30,074                  05/12/22   03/28/23    Gen Roofing Contrs                  
                                                            RC-04          16,275                  05/12/22   03/28/23    Gen Roofing Contrs                  
                                                            RC-05          19,761                  05/12/22   03/28/23    Gen Roofing Contrs                  
 
19-0651   Additions and Alterations    0-002-016  02/19/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            AAEC11-5            0                  02/09/22   11/30/22    Patricia Elec                       
                                                            AAEC1101            0                  01/07/21   03/15/21    PATRICIA ELECTRIC                   
                                                            AAEC12-1            0                  10/14/21   11/21/22    Patricia Electric                   
                                                            AAEC12-2            0                  02/09/22   11/30/22    Patricia Elec                       
                                                            AAGC1101            0                  01/07/21   03/16/21    BETTE & CRING, LLC                  
                                                            AAGC1102            0                  01/07/21   03/16/21    BETTE & CRING, LLC                  
                                                            AAGC1103            0                  01/07/21   03/19/21    BETTE & CRING, LLC                  
                                                            AAGC1104            0                  01/07/21   03/16/21    BETTE & CRING, LLC                  
                                                            AAGC1105            0                  01/07/21   03/16/21    BETTE & CRING, LLC                  
                                                            AAGC1106            0                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            AAGC12-4            0                  10/14/21   11/22/22    Bette&Cring LLC                     
                                                            AAGC1201            0                  01/07/21   03/16/21    BETTE & CRING, LLC                  
                                                            AAGC1202            0                  01/07/21   03/16/21    BETTE & CRING, LLC                  
                                                            AAGC1203            0                  01/07/21   03/16/21    BETTE & CRING, LLC                  
                                                            AAGC1205            0                  01/23/23   12/12/23    BETTE & CRING                       
                                                            AAGC1206            0                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            AAGC1301            0                  01/23/23   12/12/23    Bette & Cring, LLC                  
                                                            AAGC1302            0                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            AAHC-07             0                  01/23/23   11/16/23    C&S TECHNICAL RESOURCES             
                                                            AAHC11-4            0                  10/14/21   11/22/22    C&STech Resources                   
                                                            AAHC11-5            0                  10/14/21   11/22/22    C&STech Resources                   
                                                            AAHC11-6            0                  02/09/22   11/30/22    C&STech Resrcs                      
                                                            AAHC1101            0                  01/07/21   03/15/21    C&S TECHNICAL RESOURCES             
                                                            AAHC1108            0                  01/23/23   11/16/23    C&S TECHNICAL RESOURCES             
                                                            AAHC1109            0                  01/23/23   11/16/23    C&S TECHNICAL RESOURCES             
                                                            AAHC1110            0                  01/23/23   11/16/23    C&S TECH RESOURCES                  
                                                            AAHC1201            0                  01/07/21   03/15/21    C&S TECHNICAL RESOURCES             
                                                            AAPC11-4            0                  10/14/21   11/22/22    Burns Bros Contractors              
                                                            AAPC11-5            0                  02/09/22   11/30/22    Burns Bros Contrs                   
                                                            AAPC1101            0                  01/07/21   03/15/21    BURNS BROS. CONTRACTORS             
                                                            AAPC1102            0                  01/07/21   03/15/21    BURNS BROS. CONTRACTORS             
                                                            AAPC1103            0                  01/07/21   03/15/21    BURNS BROS. CONTRACTORS             
                                                            AAPC1106            0                  01/23/23     /  /      BURNS BROS CONTRACTORS              
                                                            AAPC1107            0                  01/23/23     /  /      NURNS BROS CONTRACTORS              
                                                            AAPC1108            0                  01/23/23   11/17/23    BURNS BROTHERS CONTRACTORS          
                                                            AAPC1201            0                  10/29/20   01/11/21    BURNS BROS CONTRACTORS              
                                                            AAPC1202            0                  01/23/23   11/16/23    BURNS BROS CONTRACTORS              
                                                            EC-01          -1,195                  10/29/20   01/11/21    PATRICIA ELECTRIC                   
                                                            EC-02          22,337                  02/09/22   11/30/22    Patricia Elec                       
                                                            EC-03          65,501                  02/09/22   11/30/22    Patricia Elec                       
                                                            EC-04          20,881                  10/14/21   11/18/22    Patricia Electric                   
                                                            EC-05          28,358                  10/14/21   11/18/22    Patricia Electric                   
                                                            EC-06          13,370                  10/14/21   11/18/22    Patricia Electric                   
                                                            EC-07          10,991                  10/14/21   11/18/22    Patricia Electric                   
                                                            EC-08          33,445                  02/09/22   11/30/22    Patricia Elec                       
                                                            EC-09          26,587                  02/09/22   11/30/22    Patrica Elec                        
                                                            EC-10           2,330                  02/09/22   11/30/22    Patricia Elec                       
                                                            EC-11          36,416                  01/23/23   11/16/23    PATRICIA ELEC                       
                                                            EC-12           6,075                  01/23/23   11/17/23    PATRICIA ELEC INC                   
                                                            EC-13          32,545                  01/23/23   11/17/23    PATRICIA ELEC                       
                                                            EC-14          34,915                  01/23/23   11/16/23    PATRICIA ELEC                       
                                                            EC-15          30,712                  01/23/23   11/16/23    PATRICIA ELEC                       
                                                            EC-16          21,415                  01/23/23     /  /      PATRICIA ELEC                       
                                                            EC-17          10,355                  01/23/23   11/16/23    PATRICIA ELEC                       
                                                            EC-18          22,387                  01/23/23   11/17/23    PATRICIA ELEC                       
                                                            EC-19         -36,514                  01/23/23   11/16/23    PATRICIA ELEC                       
                                                            EC11-03             0                  06/16/21   03/22/22    Patricia Electric                   
                                                            EC11-04             0                  06/16/21   03/22/22    Patricia Electric                   
                                                            GC-01          -8,500                  01/08/21   03/29/21    BETTE & CRING, LLC                  
                                                            GC-02          28,849                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-03          26,026                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-04          25,598                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-05          17,445                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-06          10,033                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-07          20,988                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-08           4,342                  02/24/21   04/19/21    BETTE & CRING, LLC                  
                                                            GC-09          45,854                  02/24/21   04/13/21    BETTE & CRING, LLC                  
                                                            GC-10          82,156                  02/24/21   04/13/21    BETTE & CRING, LLC                  
                                                            GC-11          10,828                  06/16/21   03/15/22    Bette & Cring LLC                   
                                                            GC-12         143,128                  06/16/21   03/15/22    Bette & Cring LLC                   
                                                            GC-13          34,246                  06/16/21   03/15/22    Bette & Cring LLC                   
                                                            GC-14          56,277                  02/09/22   02/09/23    Bette & Cring, LLC                  
                                                            GC-15           7,462                  02/09/22   02/09/23    Bette &Cring LLC                    
                                                            GC-16          34,842                  10/14/21   12/02/22    Bette&Cring, LLC                    
                                                            GC-17          10,784                  10/14/21   12/02/22    Bette&Cring, LLC                    
                                                            GC-18          30,786                  10/14/21   12/02/22    Bette & Cring, LLC                  
                                                            GC-19          18,385                  10/14/21   12/02/22    Bette&Cring, LLC                    
                                                            GC-20          33,950                  10/14/21   12/02/22    Bette & Cring, LLC                  
                                                            GC-21          23,969                  10/14/21   12/02/22    Bette & Cring, LLC                  
                                                            GC-22          17,966                  10/14/21   12/02/22    Bette & Cring, LLC                  
                                                            GC-23          26,323                  02/09/22   02/09/23    Bette &Cring LLC                    
                                                            GC-24           3,932                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-25           7,951                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-26           7,086                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-27           3,688                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-28          10,204                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-29          16,296                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-30           6,351                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-31          86,921                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-32          98,916                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-33          21,965                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-34          24,435                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-35           7,202                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-36           9,945                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-37          22,324                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-38           6,014                  02/09/22   02/09/23    Bette&Cring LLC                     
                                                            GC-39          14,973                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-40           3,528                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-41          10,536                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-42           4,694                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-43          31,261                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-44          22,653                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-45          24,227                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-46          32,365                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-47          34,632                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-48          34,930                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-49          34,463                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-50          30,803                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-51          17,137                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-52          31,643                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-53          32,195                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-54          22,224                  01/23/23     /  /      BETTE & CRING LLC                   
                                                            GC-55          21,750                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-56           8,705                  01/23/23     /  /      BETTE & CRING LLC                   
                                                            GC-57          31,521                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-58          33,390                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-59          28,995                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-60          29,735                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-61          21,092                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-62          21,968                  01/23/23   12/12/23    BETTE & CRING LLC                   
                                                            GC-63          12,297                  01/23/23     /  /      BETTE & CRING LLC                   
                                                            GC-64         -18,170                  01/18/23   12/12/23    BETTE & CRING LLC                   
                                                            HC-01          -1,650                  01/07/21   03/15/21    C&S TECHNICAL RESOURCES             
                                                            HC-02          -3,228                  08/18/21   04/20/22    C&STECHNICAL RESOURCES              
                                                            HC-03        -135,725                  01/18/23   12/14/23    C&S TECHNICAL RESOURCES             
                                                            HC-04           2,894                  01/18/23   06/13/23    C&S TECHNICAL RESOURCES             
                                                            HC11-03             0                  06/16/21   03/22/22    C&S Technical Resources             
                                                            PC-01           7,349                  01/23/23     /  /      BURNS BROS CONTRACTORS              
                                                            PC-02          15,381                  01/18/23   06/13/23    BURNS BROS CONTRACTORS              
                                                            PC-03         -13,516                  01/18/23   06/13/23    BURNS BROS CONTRACTORS              
                                                            PC-04           4,043                  01/18/23   06/13/23    BURNS BROS CONTRACTING              
                                                            SC-01          13,712                  10/31/22   12/13/23    Smith Site Devlp                    
                                                            SC-02          34,799                  01/23/23   12/12/23    SMITH SITE DEVELOPMENT              
                                                            SC-03          34,100                  01/23/23   12/12/23    SMITH SITE DEVELOPMENT              
 
02-1602FP Reconstruction               0-002-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cicero Elementary:
93-0405   Reconstruction               0-003-006  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0982   Additions and Alterations    0-003-007  05/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1233   Reconstruction               0-003-008  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1754   Reconstruction               0-003-009  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0965   Reconstruction               0-003-011  10/23/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0779   Reconstruction               0-003-012  02/16/05  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1670   Reconstruction               0-003-014  02/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1601FP Reconstruction               0-003-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1360SC Visual Structural Inspection 0-003-SC1  03/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lakeshore Road Elementary:
93-0485   Reconstruction               0-004-004  01/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1234   Reconstruction               0-004-006  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0983   Additions and Alterations    0-004-007  05/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0183   Reconstruction               0-004-008  08/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1245   Reconstruction               0-004-009  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1175   Reconstruction               0-004-012  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1758   Reconstruction               0-004-013  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1387   Reconstruction               0-004-018  04/10/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ONE (1)        14,513                  10/13/09   11/18/09    DIAMOND ROOFING CO INC              
 
02-1597FP Reconstruction               0-004-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1364SC Visual Structural Inspection 0-004-SC1  03/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Main Street School:
93-0486   Reconstruction               0-005-005  01/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0406   Reconstruction               0-005-006  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1235   Reconstruction               0-005-008  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1476   Reconstruction               0-005-009  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0537   Reconstruction               0-005-010  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1246   Reconstruction               0-005-011  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1176   Reconstruction               0-005-012  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1753   Reconstruction               0-005-013  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2159   Reconstruction               0-005-015  07/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0781   Reconstruction               0-005-016  02/16/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roxboro Elementary School:
94-1236   Reconstruction               0-008-009  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1545   Reconstruction               0-008-011  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0538   Reconstruction               0-008-012  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1247   Reconstruction               0-008-013  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1756   Reconstruction               0-008-014  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0434   Additions and Alterations    0-008-016  07/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,289                  11/21/03   11/24/03    Welliver McGuire                    
                                                            1             -17,380                  11/21/03   11/24/03    Bette & Cring                       
                                                            1               9,806                  11/21/03   12/22/03    Oswego Mech.                        
                                                            1              28,122                  03/16/04   08/02/04    RG Burns Electric                   
                                                            1              18,625                  03/15/05   01/03/06    Airisde Technology Corp             
                                                            1              -6,610                  06/08/06   07/26/06    Solvay Iron works                   
                                                            10              7,154                  03/16/04   08/02/04    RG Burns Electric                   
                                                            10             14,252                  10/13/05   10/28/05    Welliver McGuire                    
                                                            11              7,544                  03/16/04   04/23/04    RG Burns Electirc                   
                                                            11              6,843                  10/13/05   10/28/05    Welliver McGuire                    
                                                            12              3,404                  03/16/04   04/23/04    RG Burns Electric                   
                                                            12             22,110                  03/15/05   04/15/05    Welliver McGuire                    
                                                            13             14,599                  03/16/04   04/23/04    RG Burns Electric                   
                                                            13             17,755                  03/15/05   03/31/05    Welliver McGuire                    
                                                            14             20,741                  03/15/05   03/31/05    Welliver McGuire                    
                                                            15             14,332                  03/15/05   03/31/05    Welliver McGuire                    
                                                            16              2,604                  03/15/05   03/31/05    Welliver McGuire                    
                                                            17              7,327                  06/08/06   07/26/06    Welliver MCGuire                    
                                                            2              20,337                  11/21/03   12/22/03    Oswego Mech.                        
                                                            2              10,230                  01/15/04   01/28/04    Welliver McGuire                    
                                                            2              25,929                  03/16/04   08/02/04    RG Burns Electric                   
                                                            2              13,864                  03/15/05   01/03/06    Airisde Technology Corp             
                                                            3              13,423                  01/15/04   01/29/04    Oswego Mech.                        
                                                            3              17,909                  03/16/04   04/06/04    Welliver McGuire                    
                                                            3              32,918                  03/16/04   08/02/04    RG Burns Electric                   
                                                            3               5,258                  03/15/05   01/03/06    Airside Technology Corp             
                                                            4              19,934                  03/16/04   08/02/04    RG Burns Electric                   
                                                            4              46,019                  03/15/05   03/31/05    Welliver McGuire                    
                                                            4               2,402                  06/08/06   08/24/06    Airside technology Corp             
                                                            5              21,799                  01/15/04   01/28/04    Welliver McGuire                    
                                                            5              19,023                  03/16/04   08/02/04    RG Burns Electric                   
                                                            6               6,804                  01/15/04   01/28/04    Welliver McGuire                    
                                                            6              10,300                  03/16/04   04/23/04    RG Burns Electric                   
                                                            7               6,516                  01/26/04     /  /      RG Burns Electric                   
                                                            7              22,269                  10/13/05   10/28/05    Welliver McGuire                    
                                                            8              18,402                  01/26/04   02/02/04    RG Burns Electric                   
                                                            8              27,171                  10/13/05   10/28/05    Welliver McGuire                    
                                                            9              16,699                  01/26/04     /  /      RG Burns Electric                   
                                                            9              14,930                  10/13/05   10/28/05    Welliver McGuire                    
 
06-0048SC Visual Structural Inspection 0-008-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Smith Rd. Elementary:
93-1624   Reconstruction               0-009-006  06/30/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0463   Reconstruction               0-009-007  12/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1237   Reconstruction               0-009-008  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0539   Reconstruction               0-009-009  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1248   Reconstruction               0-009-010  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1177   Reconstruction               0-009-011  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1755   Reconstruction               0-009-012  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0822   Additions and Alterations    0-009-014  06/30/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AB-01           2,406                  01/27/11   02/24/11    JAG ENVIRONMENTAL LLC               
                                                            AB-02          25,166                  05/11/11   07/13/11    JAG ENVIRONMENTAL LLC               
                                                            E-01           -8,869                  01/27/11   02/24/11    HUEN NEW YORK INC                   
                                                            E-02            2,974                  05/02/11   05/20/11    HUEN OF NEW YORK INC                
                                                            E-03            6,841             300  09/09/11   02/13/12    HUEN OF NEW YORK INC                
                                                            E-04           11,222             508  01/25/12   09/19/12    HUEN OF NEW YORK INC                
                                                            E-05              -66                  01/25/12   09/19/12    HUEN OF NEW YORK INC                
                                                            E-06           11,108                  01/25/12   09/19/12    HUEN OF NEW YORK INC                
                                                            E-07           11,184                  02/27/12   06/17/19    HUEN OF NEW YORK INC                
                                                            E-08            4,847             545  02/27/12   03/06/13    HUEN OF NEW YORK INC                
                                                            GC-01           4,201                  11/04/10   11/12/10    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-02           6,034                  05/02/11   05/20/11    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-03           6,398                  05/02/11   05/20/11    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-04          12,197                  05/02/11   05/20/11    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-05          31,264                  07/14/11   08/17/11    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-06          28,627                  09/09/11   10/11/11    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-07          21,372                  11/14/11   09/26/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-08          22,095                  11/14/11   09/26/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-09          26,771                  11/21/11   08/22/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-10          12,865                  11/21/11   08/22/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-11          35,589                  12/05/11   08/22/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-12          27,895                  12/05/11   08/22/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-13          18,013                  01/25/12   08/22/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-14          25,717                  01/25/12   08/22/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-15          24,140                  02/21/12   09/26/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-19           7,840                  05/14/12   09/26/12    PARSONS-MCKENNA CONSTRUCTION INC    
                                                            GC-20           4,420                  05/14/12   09/26/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-21          11,784                  06/13/12   12/26/12    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            GC-22            -869                  10/01/12   06/06/13    PARSONS-MCKENNA CONSTRUCTION CO INC 
                                                            H-01            9,606                  05/02/11   05/20/11    BROSH MECHANICAL INCORPORATED       
                                                            H-02            1,991                  05/02/11   05/20/11    BROSH MECHANICAL INCORPORATED       
                                                            H-03            4,383             657  09/09/11   02/13/12    BROSH MECHANICAL INCORPORATED       
                                                            H-04           20,126           3,018  11/14/11   02/08/13    BROSH MECHANICAL INCORPORATED       
                                                            H-05                0                  02/27/12   03/06/13    BROSH MECHANICAL INCORPORATED       
                                                            P-01            9,790             980  09/09/11   02/13/12    BROSH MECHANICAL INCORPORATED       
                                                            P-02             -665                  01/25/12   09/19/12    BROSH MECHANICAL INCORPORATED       
                                                            P-03            1,504             225  01/25/12   09/19/12    BROSH MECHANICAL INCORPORATED       
                                                            P-04             -573                  02/27/12   03/06/13    BROSH MECHANICAL INCORPORATED       
                                                            R-01              479                  01/27/11   02/24/11    TITAN ROOFING INC                   
                                                            R-02            8,876                  09/09/11   10/11/11    TITAN ROOFING INC                   
                                                            R-03               64                  01/25/12   08/22/12    TITAN ROOFING INC                   
                                                            R-04           12,307                  02/27/12   03/06/13    TITAN ROOFING INC                   
                                                            R-05           27,946                  09/06/13   09/13/13    Titan Roofing, Inc.                 
                                                            S-01           -3,043                  05/04/12   09/26/12    LAN-CO COMPANIES INC                
 
21-1659   Reconstruction               0-009-016  08/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  09/05/23   12/26/23    MID-STATE ELECTRICAL                
                                                            EC-02               0                  09/05/23   12/26/23    MID-STATE ELECTRICAL                
                                                            EC-03          -6,083                  09/05/23   12/26/23    MID STATE ELECTRICAL                
                                                            SC-01               0                  05/09/23   12/29/23    SHAWN MALONE                        
                                                            SC-02          12,319                  05/09/23   12/22/23    SHAWN MALONE EXCAVATING             
 
02-1600FP Reconstruction               0-009-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roxboro Middle School:
92-0197   Reconstruction               0-010-008  03/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0407   Reconstruction               0-010-009  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1238   Reconstruction               0-010-010  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0502   Reconstruction               0-010-011  01/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1553   Reconstruction               0-010-012  05/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0540   Reconstruction               0-010-013  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1249   Reconstruction               0-010-014  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1178   Reconstruction               0-010-015  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1757   Reconstruction               0-010-016  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0159   Additions and Alterations    0-010-018  11/03/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            010             6,731                  11/26/08   02/05/09    GREEN PLUMBING, INC.                
                                                            011             4,621                  11/26/08   02/05/09    GREEN PLUMBING, INC.                
                                                            012            21,235                  11/26/08     /  /      EDWARD JOY COMPANY                  
                                                            013             9,554                  11/26/08     /  /      EDWARD JOY COMPANY                  
                                                            014            24,751                  11/26/08   03/06/09    EDWARD JOY COMPANY                  
                                                            018             3,093                  11/17/08   01/30/09    RIDLEY ELECTRIC CO., INC.           
                                                            019               524                  11/17/08   01/30/09    RIDLEY ELECTRIC CO., INC.           
                                                            056             9,839                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            057             3,967                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            058             4,187                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            059             7,180                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            060             6,494                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            061            13,944                  11/03/08   04/20/09    COURT STREET COMPANIES              
                                                            062            19,154                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            063            29,567                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            064               226                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            065             2,652                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            066             8,013                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            067             6,863                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            1              14,570                  10/13/05   10/25/05    Edward Joy Co                       
                                                            1              15,027                  10/13/05   11/08/05    court Street Co                     
                                                            1              29,327                  06/19/06   01/12/07    Ridley Electric                     
                                                            1              33,437                  06/19/06   01/30/12    Green Plumbing                      
                                                            1               1,235                  09/07/06   10/19/06    R and S Associates General          
                                                            1              12,610                  03/26/07   04/03/07    Joseph Filhan Co                    
                                                            10             11,939                  08/25/06   10/13/06    Court Street Companies              
                                                            10              6,062                  03/26/07   04/06/07    Edward Joy                          
                                                            10              6,279                  07/20/07   08/07/07    Ridley Electric                     
                                                            11              9,514                  08/25/06   10/13/06    Court Street Companies              
                                                            11              2,795                  07/20/07   08/20/07    Ridley Electric                     
                                                            11              8,813                  11/26/08   02/05/09    EDWARD JOY COMPANY                  
                                                            12              4,998                  08/25/06   10/13/06    Court Street Companies              
                                                            12              9,213                  11/17/08   01/30/09    RIDLEY ELECTRIC CO., INC.           
                                                            13              6,555                  08/25/06   10/13/06    Court Street Co                     
                                                            13              6,671                  11/17/08   03/06/09    RIDLEY ELECTRIC CO., INC.           
                                                            14              3,200                  09/08/06   10/19/06    Court Street                        
                                                            14             12,976                  11/17/08     /  /      RIDLEY ELECTRIC CO., INC.           
                                                            15             12,615                  09/08/06   10/19/06    Court Street                        
                                                            15             13,612                  11/17/08   01/30/09    RIDLEY ELECTRIC CO., INC.           
                                                            16              6,321                  09/08/06   10/19/06    Court Street                        
                                                            16              6,271                  11/26/08   02/05/09    EDWARD JOY COMPANY                  
                                                            16              8,999                  11/17/08   01/30/09    RIDLEY ELETRIC CO., INC.            
                                                            17             15,450                  09/08/06   10/19/06    Court Street Companies              
                                                            18              7,397                  09/08/06   10/19/06    Court street Companies              
                                                            19              6,820                  09/08/06   10/19/06    Court Street Companies              
                                                            1A           -261,700                  06/19/06   01/12/07    Edward joy                          
                                                            1B            261,700                  06/19/06   01/12/07    Edward joy                          
                                                            2              15,069                  10/13/05   11/08/05    Court Street Co                     
                                                            2              11,581                  06/19/06   02/22/07    Edward joy                          
                                                            2               3,935                  06/19/06   11/30/06    Green Plumbing                      
                                                            2               4,898                  09/08/06   12/18/06    Ridley Electric                     
                                                            2                 839                  12/04/06   01/09/07    R and S Associates General          
                                                            20             15,611                  09/08/06   10/19/06    Court Street Companies              
                                                            20             23,998                  11/17/08   03/06/09    RIDLEY ELECTRIC CO., INC.           
                                                            21              9,828                  09/08/06   10/19/06    Court Street Companies              
                                                            22              6,514                  12/04/06   01/09/07    Court Street Companies              
                                                            23             10,243                  12/04/06   01/09/07    Court Street Co                     
                                                            24              6,532                  12/04/06   01/09/07    Court Street Co                     
                                                            25              3,749                  12/04/06   01/09/07    Court Street                        
                                                            26             10,442                  12/04/06   01/09/07    Court Streete                       
                                                            27              4,094                  12/04/06   01/09/07    Court Street                        
                                                            28              5,437                  12/04/06   01/09/07    Court Street                        
                                                            29             13,277                  12/04/06   01/09/07    Court Street                        
                                                            3              14,001                  10/13/05   11/08/05    Court Street Co                     
                                                            3              15,064                  06/19/06   01/12/07    Ridley Electric                     
                                                            3               8,496                  06/19/06   01/12/07    Green Plumbing                      
                                                            3               6,366                  06/19/06   01/12/07    Edward joy                          
                                                            30              2,278                  03/26/07   04/03/07    Court Street Companies              
                                                            31              6,276                  03/26/07   04/03/07    Court street Companies              
                                                            32              6,660                  03/26/07   04/03/07    Court Street Companies              
                                                            33             20,018                  03/26/07   04/03/07    Court Street Companies              
                                                            34             15,380                  03/26/07   04/03/07    Court Street Companies              
                                                            35             15,562                  03/26/07   04/03/07    Court Street Companies              
                                                            36             15,589                  03/26/07   04/03/07    Court Street Companies              
                                                            37              8,968                  03/26/07   04/03/07    Court street Companies              
                                                            38              3,676                  07/20/07   08/20/07    Court street Companies              
                                                            39             11,661                  07/20/07   08/20/07    Court Street Companies              
                                                            4               9,927                  06/19/06   01/09/07    Edward Joy                          
                                                            4               6,137                  06/19/06   01/30/12    Greeen Plumbing                     
                                                            4              11,479                  06/19/06   06/23/06    Court Street Companies              
                                                            4              13,348                  09/08/06   01/09/07    Ridley Electric                     
                                                            40             13,063                  07/20/07   08/20/07    Court Street                        
                                                            41             18,075                  10/10/08   11/12/08    COURT STREET COMPANIES              
                                                            42             24,979                  10/10/08   11/12/08    COURT STREET COMPANIES              
                                                            43             13,149                  10/10/08   11/12/08    COURT STREET COMPANIES              
                                                            44             14,373                  10/10/08   11/12/08    COURT STREET COMPANIES              
                                                            45             13,377                  10/24/08   11/12/08    COURT STREET COMPANIES              
                                                            46              9,089                  10/24/08   11/12/08    COURT STREET COMPANIES              
                                                            47             10,422                  10/24/08   11/12/08    COURT STREET COMPANIES              
                                                            48             14,421                  10/24/08   11/12/08    COURT STREET COMPANIES              
                                                            49              7,498                  10/24/08   11/12/08    COURT STREET COMPANIES              
                                                            5             -10,055                  06/19/06   01/12/07    Edward joy                          
                                                            5               5,554                  06/19/06   01/12/07    Gree Plumbing                       
                                                            5               4,407                  06/19/06   06/23/06    Court Street Companies              
                                                            5              11,256                  09/08/06   01/09/07    Ridley Electric                     
                                                            50              3,520                  10/24/08   11/12/08    COURT STREET COMPANIES              
                                                            51             11,387                  10/24/08   11/12/08    COURT STREET COMPANIES              
                                                            52             14,173                  11/03/08   04/14/09    COURT STREET COMPANIES              
                                                            53              9,009                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            54              5,093                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            55              4,390                  11/03/08   04/21/09    COURT STREET COMPANIES              
                                                            6               2,480                  06/19/06   11/30/06    Greeb Plumbing                      
                                                            6              12,699                  08/25/06   10/13/06    Court Street Companies              
                                                            6               8,333                  12/04/06   01/12/07    Ridley Electric                     
                                                            6              14,374                  12/04/06     /  /      Edward Joy                          
                                                            68              7,949                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            7              14,053                  08/25/06   10/13/06    Court Street Companies              
                                                            7              10,469                  03/26/07     /  /      EDward Joy                          
                                                            7               5,200                  03/26/07   04/06/07    Green Plumbing                      
                                                            7               8,330                  03/26/07   04/06/07    Ridley Electric                     
                                                            8               8,889                  08/25/06   10/13/06    Court Street Companies              
                                                            8              17,814                  03/26/07   08/07/07    Edward Joy Co                       
                                                            8               9,643                  07/20/07   08/07/07    Ridley Electric                     
                                                            8               2,836                  11/26/08   01/30/12    GREEN PLUMBING, INC.                
                                                            9               7,099                  07/20/07   08/07/07    EDward joy                          
                                                            9              11,256                  07/29/07     /  /      Ridley Electric                     
                                                            9              63,487                  11/26/08   02/16/09    COURT STREET COMPANIES              
                                                            9                 608                  11/26/08   02/05/09    GREEN PLUMBING, INC.                
                                                            E-021           1,384                  11/17/08   01/30/09    RIDLEY ELECTRIC CO., INC.           
                                                            GC-069         19,365                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            GC-070         12,026                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            GC-071          7,123                  11/10/08   12/04/08    COURT STREET COMPANIES              
                                                            GC-072          2,745                  10/29/09   12/21/09    COURT STREET COMPANIES              
                                                            H-015           7,952                  11/26/08   03/06/09    EDWARD JOY COMPANY                  
 
11-0761   Reconstruction               0-010-020  04/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            14,318                  02/27/13   05/14/13    TITAN ROOFING INC                   
                                                            002             3,553                  03/07/13   05/17/13    TITAN ROOFING INC                   
 
17-0994   Reconstruction               0-010-021  03/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1598FP Reconstruction               0-010-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Syracuse Jr. High School:
90-1602   Reconstruction               0-011-008  06/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0487   Reconstruction               0-011-010  01/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0033   Reconstruction               0-011-011  08/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1290   Additions and Alterations    0-011-012  07/01/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2             9,950                  04/06/01   01/14/03    Kay R Elec.                         
                                                            E-3             3,403                  04/06/01   01/14/03    Kay R Elec.                         
                                                            E-4             5,437                  04/06/01   01/14/03    Kay R Elec.                         
                                                            E-5            10,517                  04/06/01   01/14/03    Kay R Elec.                         
                                                            E-6            12,535                  04/06/01   01/14/03    Kay R Elec.                         
                                                            E-7             4,410                  04/06/01   01/14/03    Kay R Elec.                         
                                                            E-9             5,169                  04/06/01   01/14/03    Kay-R Elec.                         
 
94-1239   Reconstruction               0-011-013  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1179   Reconstruction               0-011-015  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1752   Reconstruction               0-011-016  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0966   Reconstruction               0-011-019  10/23/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,402                  12/23/03   12/30/03    BF Yenny Construction               
                                                            1              -5,445                  12/09/05   01/17/06    Lafrance plumbing Heating           
                                                            2               7,171                  12/23/03   12/30/03    BF Yenny Construction               
                                                            3               4,627                  12/23/03   12/30/03    BF Yenny Construction               
                                                            4               3,132                  12/23/03   12/30/03    BF Yenny Construction               
                                                            5               5,737                  03/31/04   04/06/04    BF Yenny Construction               
 
01-0860   Additions and Alterations    0-011-020  10/15/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               6,000                  03/31/04   04/08/04    Joseph Flihan                       
                                                            1              21,893                  05/21/04   06/10/04    Airside Technology                  
                                                            2              20,416                  05/21/04   06/10/04    Airside Technology                  
                                                            2              -2,729                  09/12/05   09/20/05    Joseph flihan Co                    
                                                            3              15,714                  09/27/04   11/29/04    Airside Technology                  
                                                            7                 844                  05/31/05   06/29/05    BF Yenny Construction               
 
01-0861   Reconstruction               0-011-021  10/15/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6               5,417                  05/31/05   06/29/05    BF Yenny Construction               
 
04-0782   Reconstruction               0-011-022  02/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              62,300                  12/15/06   01/30/07    Ab Construction Roofing             
 
05-1043   Reconstruction               0-011-023  05/17/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,785                  01/22/07   03/15/07    Upstate Construction                
 
15-0709   Reconstruction               0-011-024  05/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  09/26/16   10/18/16    Bellows Construction                
                                                            GC-02         -14,525                  09/26/16   10/18/16    Bellows Construction                
                                                            GC-03               0                  11/30/16   12/02/16    Bellows Construction                
                                                            GC-04          -4,195                  11/30/16   12/02/16    Bellows Construction                
                                                            R-01                0                  10/28/16   11/01/16    J&B Installations, Inc.             
                                                            R-02                0                  10/28/16   11/01/16    J&B Installations, Inc.             
                                                            R-03          -16,666                  12/02/16   12/06/16    J&B Installations, Inc.             
                                                            R-04           -3,556                  01/20/17   01/23/17    J&B Installations, Inc.             
 
17-1441   Reconstruction               0-011-025  11/01/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AARC2-01            0                  03/08/21   06/28/21    WCA ROOFING & SHEET METAL CO.       
                                                            AARC2-02            0                  03/08/21   06/28/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-01         -5,258                  03/08/21   06/24/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-02            495                  03/08/21   06/24/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-03        118,933                  03/08/21   06/28/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-04         25,212                  03/08/21     /  /      WCA ROOFING & SHEET METAL CO.       
                                                            RC2-05            795                  03/08/21   06/24/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-06         20,554                  03/08/21   06/28/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-07         13,486                  03/08/21   06/28/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-08         18,953                  03/08/21   06/28/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-09         25,568                  03/08/21   06/28/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-10         15,891                  03/08/21   06/29/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-11         -2,000                  03/08/21   06/29/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-12         12,938                  03/08/21   06/29/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-13          7,693                  03/08/21   06/29/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-14         20,239                  03/08/21   06/29/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-15         -4,547                  03/08/21   06/29/21    WCA ROOFING & SHEET METAL CO.       
                                                            RC2-16          1,483                  03/08/21   06/29/21    WCA ROOFING & SHEET METAL CO.       
 
22-0004   Reconstruction               0-011-026  10/24/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-01               0                  05/22/23   12/28/23    JOHN W. DANFORTH COMPANY            
 
02-0618FP Reconstruction               0-011-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0049SC Visual Structural Inspection 0-011-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1361SC Visual Structural Inspection 0-011-SC2  03/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gillette Road Middle School:
90-1740   Reconstruction               0-012-004  07/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0488   Reconstruction               0-012-005  01/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1240   Reconstruction               0-012-006  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0503   Reconstruction               0-012-007  01/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1477   Reconstruction               0-012-008  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0541   Reconstruction               0-012-009  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1374   Reconstruction               0-012-010  04/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1022   Reconstruction               0-012-011  02/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1250   Reconstruction               0-012-012  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1751   Reconstruction               0-012-013  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0708   Additions and Alterations    0-012-016  09/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            019             5,429                  11/26/08   02/05/09    GREEN PLUMBING, INC.                
                                                            1              13,170                  11/10/03   11/21/03    Christa Construction                
                                                            1              22,612                  11/10/03   11/21/03    Billitier Electric                  
                                                            1              10,459                  03/31/04   04/08/04    Rosenthal Chadwick                  
                                                            1              39,246                  05/10/04   05/19/04    Green Plumbing                      
                                                            1               5,667                  07/06/04   07/15/04    Robert Law                          
                                                            1              15,491                  02/18/05   03/11/05    Maines CDI                          
                                                            1               9,891                  05/31/05   06/23/05    Gray Ledge Enterprises              
                                                            1               9,455                  11/17/05   12/09/05    NEP Glass Co                        
                                                            10             13,827                  03/08/04   03/17/04    Christa Construction                
                                                            10              9,810                  05/10/04   05/19/04    Green Plumbing                      
                                                            10             11,417                  05/10/04   05/19/04    Billitier Electric                  
                                                            10             28,160                  12/09/05     /  /      Rosenthal Chadwick                  
                                                            11             10,641                  03/08/04   03/17/04    Christa Construction                
                                                            11             14,787          14,787  05/10/04   05/21/04    Billitier Electric                  
                                                            11              4,889                  12/20/04   12/28/04    Green Plumbing                      
                                                            12              6,155                  04/16/04   04/27/04    Christa Construction                
                                                            12              7,354                  07/23/04   08/09/04    Billitier Electric                  
                                                            12              9,370                  12/20/04   12/28/04    Green Plumbing                      
                                                            13              3,846                  04/19/04   09/09/04    Christa Construction                
                                                            13              5,400                  12/01/04   12/17/04    Billitier Electric                  
                                                            13              8,718                  02/07/05   03/11/05    Green Plumbing Inc                  
                                                            14              4,314                  04/19/04   04/27/04    Christa Construction                
                                                            14              2,259                  12/01/04   12/17/04    Billitier Electric                  
                                                            14              5,880                  02/18/05   03/11/05    Green Plumbing Inc                  
                                                            15              3,983                  04/16/04   04/27/04    Christa Construction                
                                                            15             -6,404                  02/18/05   03/11/05    Billitier Electric                  
                                                            15             15,015                  05/31/05     /  /      Green Plumbing                      
                                                            16              2,281                  04/19/04   04/27/04    Christa Construction                
                                                            16              8,794                  02/18/05   03/11/05    Billitier Electric                  
                                                            16             12,172                  05/31/05   06/23/05    Green Plumbing                      
                                                            17              3,208                  04/19/04   04/27/04    Christa Construction                
                                                            17              9,305                  02/18/05   03/11/05    Billitier Electric                  
                                                            17              2,494                  05/31/05   06/23/05    Green Plumbing                      
                                                            18              6,433                  05/10/04   05/19/04    Christa Construction                
                                                            18             18,610                  02/18/05   03/11/05    Billitier Electric                  
                                                            18              9,240                  04/10/06   09/06/06    Green Plumbing                      
                                                            19              6,352                  07/06/04   07/15/04    Christa Construction                
                                                            19              5,984                  02/18/05   03/11/05    Billiter Electric                   
                                                            2              12,969           4,897  11/10/03   04/19/04    Christa Construction                
                                                            2               4,436                  03/31/04   04/08/04    Billitier Electric                  
                                                            2              21,169                  05/10/04   05/19/04    Green Plumbing                      
                                                            2              13,937                  12/20/04   12/28/04    Robert Law                          
                                                            2               2,748                  05/31/05   06/23/05    Gray Ledge Enterprises              
                                                            2                  72                  08/23/05     /  /      Maines CDI                          
                                                            20             14,905                  07/06/04   07/15/04    Christa Construction                
                                                            20             22,502                  05/31/05   06/23/05    Billitier Electric                  
                                                            21             11,909           5,062  07/06/04   07/15/04    Christa Construction                
                                                            21              8,828                  05/31/05   06/23/05    Billitier Electric                  
                                                            22              9,660                  09/27/04   10/27/04    Christa Construction                
                                                            22             14,367                  05/31/05   06/23/05    Billitier Electric                  
                                                            23              7,504                  09/27/04   10/27/04    Christa Construction                
                                                            23              4,356                  08/23/05   08/25/05    Billitier Electric                  
                                                            24              3,748                  11/17/04   11/23/04    Christa Construction                
                                                            25              4,039                  11/17/04   11/23/04    Christa Construction                
                                                            26              5,608                  11/17/04   11/23/04    Christa Construction                
                                                            27              8,507                  11/17/04   11/23/04    Christa Construction                
                                                            28             16,353                  12/20/04   12/28/04    Christa Construction                
                                                            29              3,780                  12/20/04   12/28/04    Christa Construction                
                                                            3              11,188                  11/10/03   11/21/03    Christa Construction                
                                                            3               9,315                  03/31/04   04/08/04    Billitier Electric                  
                                                            3              11,908           4,283  03/08/04   07/09/04    Green Plumbing                      
                                                            3              17,899                  12/20/04   12/28/04    Rosenthal Chadwick                  
                                                            3              13,318                  12/20/04   12/28/04    Robert Law                          
                                                            30             11,972                  12/20/04   12/28/04    Christa Construction                
                                                            31             11,061                  02/07/05   03/11/05    Christa Construction                
                                                            32              1,482                  02/18/05   03/11/05    Christa Construction                
                                                            33            -38,400                  02/16/06   07/24/06    Christa Construction                
                                                            4              43,965                  11/10/03   11/21/03    Christa Construction                
                                                            4              10,493                  03/08/04   03/25/04    Green Plumbing                      
                                                            4              10,875                  03/31/04   04/08/04    Billitier Electric                  
                                                            4              19,872          19,872  12/20/04   12/28/04    Rosenthal Chadwick                  
                                                            4               6,164                  02/07/05   03/11/05    Robert Law Inc                      
                                                            5              12,879                  11/10/03   11/21/03    Christa Construction                
                                                            5               8,406                  03/08/04   03/25/04    Billitier Electric                  
                                                            5               4,894                  03/08/04   03/25/04    Green Plumbing                      
                                                            5              10,349                  12/20/04   12/28/04    Rosenthal Chadwick                  
                                                            5               9,478                  05/31/05   06/23/05    Robert Law                          
                                                            6              19,283                  03/31/04   04/12/04    Christa Construction                
                                                            6              24,897                  03/31/04   07/09/04    Green Plumbing                      
                                                            6              10,501                  04/19/04   04/27/04    Billitier Electric                  
                                                            6              14,796                  08/23/05   08/25/05    Rosenthal Chadwick                  
                                                            7              24,360                  03/31/04   04/12/04    Christa Construction                
                                                            7              30,619                  03/31/04   04/08/04    Green Plumbing                      
                                                            7               1,853                  05/10/04   05/19/04    Billitier Electric                  
                                                            7              10,341                  11/17/05   11/23/05    Rosenthal Chadwick                  
                                                            8              11,348                  03/08/04   03/17/04    Christa Construction                
                                                            8               2,379                  04/16/04   04/27/04    Green Plumbing                      
                                                            8               7,053                  04/19/04   04/27/04    Billitier Electric                  
                                                            8               7,113                  08/23/05   08/25/05    rosenthal Chadwick                  
                                                            9               4,338                  03/08/04   03/17/04    Christa Construction                
                                                            9               4,888                  04/19/04   04/27/04    Billitier Electric                  
                                                            9              13,132                  05/10/04   05/19/04    Green Plumbing                      
                                                            9              17,739                  12/09/05   06/30/06    Rosental Chadwick                   
 
07-0127   Reconstruction               0-012-017  08/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0779   Reconstruction               0-012-018  04/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            12,398                  01/30/13   04/09/13    DIAMOND ROOFING CO INC              
 
16-1180   Reconstruction               0-012-019  04/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0951   Reconstruction               0-012-020  10/02/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AARC-01             0                  03/03/21   06/17/21    GENERAL ROOFING CONTRACTORS         
                                                            AARC-02             0                  03/03/21   07/09/21    GENERAL ROOFING CONTRACTORS         
                                                            AARC-03             0                  03/03/21   07/07/21    GENERAL ROOFING CONTRACTORS         
                                                            RC1-01         -3,000                  03/03/21   06/17/21    GENERAL ROOFING CONTRACTORS         
                                                            RC1-02          3,209                  03/03/21   06/17/21    GENERAL ROOFING CONTRACTORS         
                                                            RC1-03         -1,291                  03/03/21   06/17/21    GENERAL ROOFING CONTRACTORS         
                                                            RC1-04          5,083                  03/03/21   06/17/21    GENERAL ROOFING CONTRACTORS         
 
02-1596FP Reconstruction               0-012-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0047SC Visual Structural Inspection 0-012-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1363SC Visual Structural Inspection 0-012-SC2  03/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cicero-North Syracuse High School:
92-0198   Reconstruction               0-016-011  03/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0150   Reconstruction               0-016-012  09/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0489   Reconstruction               0-016-013  01/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0408   Reconstruction               0-016-014  12/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1241   Reconstruction               0-016-015  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1182   Reconstruction               0-016-016  05/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0850   Reconstruction               0-016-017  02/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0175   Additions and Alterations    0-016-018  01/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1709   Reconstruction               0-016-019  06/24/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1557   Reconstruction               0-016-020  11/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              37,800                  01/07/13     /  /      BATTY & HOYT,INC.                   
                                                            1              21,165                  01/07/13     /  /      MYRIAD CONSTRUCTION                 
                                                            1               4,169                  01/07/13     /  /      SYRACUSE MERIT ELECTRIC,INC         
                                                            1               9,618                  01/07/13     /  /      JAREO ASSOCITES                     
                                                            1               4,323                  01/07/13     /  /      GREEN PLUMBIN,INC                   
                                                            1             -20,260                  01/07/13     /  /      EDWARD JOY COMPANY                  
                                                            1              81,103                  01/07/13     /  /      R.J. ORTLIEB CONSTRUCTIONCO.INC     
                                                            1             -15,554                  01/07/13     /  /      BETTE & CRING,LLC                   
                                                            2              23,455                  01/07/13     /  /      MYRIAD CONSTRUCTION,INC             
                                                            2               6,300                  01/07/13     /  /      BATTY & HOYT.INC                    
                                                            3              30,735                  01/07/13     /  /      R.J ORTLIEB CONSTRUCTION CO.INC     
                                                            4               4,987                  01/07/13     /  /      R.J ORTLIEB CONSTRUCTIONCO.INC      
 
04-0776   Reconstruction               0-016-023  02/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             9,648                  09/21/06   10/19/06    Upstate Construction                
                                                            002            25,953                  09/21/06   10/19/06    Upstate Construction                
                                                            003             9,806                  09/21/06   10/19/06    Upstate Construction                
                                                            004            29,006                  09/21/06   10/19/06    Upstate Construction                
                                                            005            29,020                  09/21/06   10/19/06    Upstate Construction                
                                                            006            13,933                  09/21/06   10/19/06    Upstate Construction Service        
                                                            S-001           6,480                  08/22/05   08/25/05    Robert Law                          
                                                            S-002          -4,310                  10/11/05   10/17/05    Robert Law                          
 
04-0783   Reconstruction               0-016-024  02/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -41,924                  09/21/06   10/19/06    J and B Installations               
 
10-0330   Reconstruction               0-016-025  10/27/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0765   Reconstruction               0-016-026  04/16/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               296                  01/30/13   04/15/13    DIAMOND ROOFING CO INC              
                                                            002             1,280                  03/07/13   05/31/13    DIAMOND ROOFING CO INC              
 
13-0937   Reconstruction               0-016-027  04/22/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SW-01          27,438                  09/08/14   10/03/14    Davis Wallbridge, Inc.              
                                                            SW-02          23,197                  09/08/14   10/03/14    Davis Wallbridge, Inc.              
                                                            SW-03          19,184                  09/29/14   10/08/14    Davis Wallbridge, Inc.              
 
15-0409   Reconstruction               0-016-028  01/21/16  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1119   Reconstruction               0-016-031  09/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0025   Reconstruction               0-016-032  08/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          25,990                  01/26/22   01/31/23    Const Design&Management Inc         
                                                            GC-02          16,792                  01/26/22   01/31/23    Const Design&Managmt Inc            
 
21-1137   Reconstruction               0-016-033  05/03/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01               0                  01/18/23   12/14/23    MJS CONTRACTING SERVICES INC        
                                                            AC-02          25,970                  01/18/23   12/14/23    MJS CONTRACTING SERVICES INC        
                                                            AC-03               0                  05/17/23   12/27/23    MJ'S CONTRACTING SERVICES           
                                                            EC-01               0                  05/17/23   12/28/23    PATRICIA ELECTRIC                   
                                                            EC-02               0                  05/17/23   12/28/23    PATRICIA ELECTRIC                   
                                                            EC-03               0                  05/17/23   12/27/23    PATRICIA ELECTRIC                   
                                                            GC-02           6,577                  05/17/23   12/27/23    C&S DESIGN BUILD                    
                                                            HC-01               0                  05/17/23   12/28/23    ERIE MECHANICAL CONTRACTORS         
                                                            PC-01               0                  05/17/23   12/28/23    OSWEGO MECHANICAL                   
 
22-1671   Reconstruction               0-016-034  08/01/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0513   Reconstruction               0-016-038  10/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0069   Reconstruction               0-016-039  07/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1599FP Reconstruction               0-016-FP1  03/17/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1393SC Visual Structural Inspection 0-016-SC1  11/07/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1362SC Visual Structural Inspection 0-016-SC2  03/17/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Office:
94-1242   Reconstruction               1-007-009  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0542   Reconstruction               1-007-011  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1761   Reconstruction               1-007-012  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Bldg at Middle School:
02-0129   New Construction             2-044-001  09/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Bldg 2 @ Roxboro Middle Sch:
05-0070   New Construction             2-045-001  08/09/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Bldg 1:
94-1243   Reconstruction               3-033-004  03/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0543   Reconstruction               3-033-005  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1749   Reconstruction               3-033-006  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0784   Reconstruction               3-033-008  02/16/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Transportation Bus Bldg.#7:
96-0544   Reconstruction               5-037-006  01/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1180   Reconstruction               5-037-007  06/03/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1750   Reconstruction               5-037-008  12/13/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0205   Reconstruction               5-037-010  11/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           -15,774                  02/01/07     /  /      Huen New york                       
                                                            M-1            -8,450                  03/19/07   09/24/07    M and N Plumbing                    
 

          Transportation Center:
07-1071   New Construction             5-050-001  08/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004                 0                  05/26/09   08/31/09    GM CRISALLI & ASSOCIATES INC        
                                                            E-001               0                  03/19/09   07/06/09    BRUCE ELECTRIC INC.                 
                                                            E-002              63                  09/19/09   07/06/09    BRUCE ELECTRIC INC.                 
                                                            E-003           7,592                  03/19/09   07/06/09    BRUCE ELECTRIC INC.                 
                                                            E-004          11,602                  05/26/09   08/11/09    BRUCE ELECTRIC INC                  
                                                            E-005           6,040                  05/26/09   08/11/09    BRUCE ELECTRIC INC                  
                                                            E-006           1,540                  06/22/09   08/04/09    BRUCE ELECTRIC INC                  
                                                            E-007               0                  08/05/09   08/28/09    BRUCE ELECTRIC INC                  
                                                            E-008           3,944                  08/05/09   08/28/09    BRUCE ELECTRIC INC                  
                                                            E-009          -1,255                  11/19/09   01/20/10    BRUCE ELECTRIC INC                  
                                                            GC-001              0                  08/05/09   09/02/09    GM CRISALLI & ASSOCIATES INC        
                                                            GC-002              0                  05/26/09   08/31/09    GM CRISALLI & ASSOCIATES INC        
                                                            GC-003              0                  05/26/09   08/31/09    GM CRISALLI & ASSOCIATES INC        
                                                            GC-005         -5,900                  06/22/09   08/06/09    GM CRISALLI & ASSOCIATES INC        
                                                            GC-006          3,780                  06/22/09   08/06/09    GM CRISALLI & ASSOCIATES INC        
                                                            GC-007          8,016                  02/01/10   04/15/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-008         14,273                  06/22/09   08/06/09    GM CRISALLI & ASSOCIATES            
                                                            GC-010              0                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-011              0                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-012              0                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-013              0                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-014              0                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-015              0                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-016          2,013                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-017          6,051                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-018          8,840                  11/19/09   01/20/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC-019F        10,267                  02/01/10   04/15/10    GM CRISALLI & ASSOCIATES INC        
                                                            GC009          10,072                  08/05/09   09/02/09    GM CRISALLI & ASSOCIATES            
                                                            H-001               0                  02/09/09   06/09/09    EDWARD F. GALVIN, INC.              
                                                            H-002           9,948                  08/05/09   08/28/09    EDWARD F GALVIN INC                 
                                                            P-001               0                  08/05/09   08/28/09    BURNS BROS CONTRACTORS INC          
                                                            P-002               0                  05/26/09   08/12/09    BURNS BROTHERS CONTRACTORS INC      
                                                            P-003               0                  08/05/09   08/28/09    BURNS BROS CONTRACTORS INC          
                                                            P-004           1,124                  11/19/09   01/20/10    BURNS BROS CONTRACTORS INC          
 
16-1375   Reconstruction               5-050-002  10/05/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -52,277                  01/30/19   03/15/19    LAVALLEY BROS. CONSTRUCTION, INC.   
 

          Concession/Storage Building:
94-1183   New Construction             7-039-001  05/01/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1626   Additions and Alterations    7-039-002  07/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
96-0852   Reconstruction               7-999-001  02/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0365   Reconstruction               7-999-003  01/10/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,857                  01/29/04   08/09/04    Myriad Construction                 
                                                            2               9,991                  01/29/04   08/09/04    Myriad Construction                 
                                                            3              17,649                  01/29/04   08/09/04    Myriad Construction                 
                                                            4              17,498                  01/29/04   08/09/04    Myriad Construction                 
                                                            5              19,081                  01/29/04   08/09/04    Myriad Construction                 
                                                            6               1,971                  02/25/04   04/23/04    Myriad Construction                 
                                                            7                   0                  02/25/04   04/23/04    Myriad Construction                 
                                                            8               4,490                  02/25/04   04/23/04    Myriad Construction                 
 
15-1427   Reconstruction               7-999-004  07/19/16  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1392EP Energy Project               7-999-E01  04/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE

EAST SYRACUSE MINOA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-04-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXHeman Street Sch (sold 2014):
05-1110   Reconstruction               0-001-006  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-028         18,900                  07/23/09   11/10/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-030          1,096                  07/23/09     /  /      R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            R-002          -1,229                  02/27/08   03/08/08    APPLE ROOFING CORP                  
 
06-0487   Reconstruction               0-001-007  03/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          East Syracuse Elementary School:
00-0037   Additions and Alterations    0-002-005  03/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            78,600                  02/12/02   03/21/02    Sabre Demolition                    
                                                            001                 0                  09/06/02   10/29/02    Myriad Construction                 
                                                            001             4,712                  05/13/04   07/06/05    Brosh Mechanical, Inc.              
                                                            002             2,000                  02/12/02   03/21/02    Sabre Demolition                    
                                                            002            18,480                  04/25/02   05/30/02    Murnane Building Contractors        
                                                            002            18,540                  12/06/02   01/07/03    Green Plumbing                      
                                                            002                 0                  01/22/03   02/10/03    Myriad Construction                 
                                                            002             9,493                  08/05/03   08/14/03    Brosh Mechanical                    
                                                            003            12,605                  04/25/02   05/30/02    Murnane Building Contractors        
                                                            003            16,094                  12/09/02   01/08/03    Myriad Construction                 
                                                            003             2,888                  05/09/03   05/27/03    Green Plumbing                      
                                                            004            19,814                  05/24/02   05/29/02    Murnane Building Contractors        
                                                            004            13,488                  01/22/03   02/10/03    Myriad Construction                 
                                                            005            16,321                  08/05/02   08/16/02    Murnane Building Contractors        
                                                            005                 0                  05/09/03   05/27/03    Myriad Construction                 
                                                            006               831                  08/05/02   08/16/02    Murnane Building Contractors        
                                                            006            13,954                  05/09/03   05/27/03    Myraid Construction                 
                                                            007            -5,630                  08/05/02   08/16/02    Murnane Building Contractors        
                                                            007             1,565                  05/09/03   05/27/03    Myriad Construction                 
                                                            008            29,437                  08/29/02   10/29/02    Murnane Building Contractors        
                                                            009            18,914                  08/23/02   11/01/02    Murnane Building Contractors        
                                                            010            18,668                  08/23/02   11/01/02    Murnane Building Contractors        
                                                            011             1,138                  08/23/02   11/01/02    Murnane Building Contractors        
                                                            012             7,248                  09/06/02   10/29/02    Murnane Building Contractors        
                                                            013            12,455                  11/12/02   01/10/03    Murnane Building Contractors        
                                                            014             7,405                  12/09/02   01/08/03    Murnane Building Contractors        
                                                            015               589                  12/09/02   01/08/03    Murnane Building Contractors        
                                                            016            12,004                  02/03/03   03/04/03    Murnane Building Contractors        
                                                            017             4,979                  05/09/03   05/27/03    Murnane Building Contractors        
                                                            018            19,646                  08/05/03   08/14/03    Murnane Building Contractors        
                                                            019            15,549                  08/05/03   08/14/03    Murnane Building Contractors        
                                                            020             8,650                  08/05/03   08/14/03    Murnane Building Contractors        
                                                            021             7,560                  12/08/03   03/15/04    Murnane Building Contractors        
 
05-1111   Reconstruction               0-002-006  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            T-001           5,689                  02/27/07   03/01/07    Priority Connection                 
                                                            T-006           6,000                  02/28/08   03/08/08    PRIORITY CONNECTIONS                
 
06-0488   Reconstruction               0-002-007  03/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0025   Reconstruction               0-002-008  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DW-001              0                  07/29/09   08/11/09    DAVIS WALLBRIDGE, INC.              
                                                            DW-002           -880                  07/29/09   08/11/09    DAVIS WALLBRIDGE, INC.              
                                                            GC-007              0                  02/22/10   04/13/10    G.M. CRISALLI & ASSOCIATES INC      
 
08-0123   Reconstruction               0-002-009  03/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0572   Reconstruction               0-002-010  02/03/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001              0                  04/17/23   01/02/24    MYRIAD CONSTR.                      
                                                            EC-002         -1,434                  04/17/23     /  /      MYRIAD CONSTRUCTION                 
                                                            EC-01               0                  07/26/22   05/04/23    C&STechnical Resources              
                                                            EC-02               0                  05/17/23   12/28/23    C&S TECHNICAL RESOURCES             
                                                            EC-03          -9,580                  05/17/23   12/28/23    C&S TECHNICAL RESOURCES             
                                                            GC-01               0                  07/26/22   05/17/23    PAC Assocs of Oswego Inc            
                                                            GC-01           5,948                  04/17/23     /  /      PAC ASSOCIATES OF OSWEGO            
                                                            GC-02               0                  07/26/22   05/17/23    PAC Assocs of Oswego Inc            
                                                            GC-02          -5,000                  04/17/23   01/02/24    PAC ASSOCIATES PF OSWEGO            
                                                            GC-03               0                  07/26/22   05/17/23    PAC Assocs of Oswego Inc            
                                                            GC-04               0                  05/17/23   12/27/23    PAC ASSOCIATES OF OSWEGO            
                                                            HC-001              0                  04/17/23   01/02/24    DW & CREW MECHANICALS               
                                                            HC-01               0                  07/26/22   05/04/23    DW & Crew Mech Inc                  
                                                            HC-02               0                  07/26/22   05/04/23    DW & Crew Mech Inc                  
                                                            HC-02         -23,170                  04/17/23   12/27/23    DW & CREW MECHANICALS               
                                                            HC-03               0                  07/26/22   05/22/23    DW & Crew                           
                                                            HC-04               0                  05/17/23   12/28/23    DW & CREW MECHANICALS               
                                                            HC-05          -2,339                  05/17/23   12/28/23    DW & CREW MECHANICALS               
 
22-0021FC Reconstruction               0-002-011  12/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Park Hill Elementary School:
05-1112   Reconstruction               0-003-006  05/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0489   Reconstruction               0-003-007  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002           5,817                  07/23/09   08/04/09    RIDLEY ELECTRIC CO., INC.           
                                                            GC-007         14,082                  02/25/08   03/08/08    R.J ortlieb construction            
                                                            GC-023            490                  01/21/09   04/03/09    R.J. ORTLILEB CONSTRUCTION CO., INC.
                                                            S-PARK          7,650                  11/12/08   03/09/09    LAN-CO COMPANIES                    
 
08-0026   Reconstruction               0-003-008  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            008             1,500                  07/25/11   08/12/11    JAG ENVIRONMENTAL INC               
                                                            009           -10,000                  01/13/11   02/11/11    JAG ENVIRONMENTAL INC               
                                                            AA-001         12,779                  11/30/09   01/04/10    JAG ENVIRONMENTAL INC               
                                                            AA-002          3,800                  12/23/10   01/20/11    JAG ENVIRONMENTAL INC               
                                                            AA-004              0                  03/10/10   05/24/10    ABSCOPE ENVIRONMENTAL INC           
                                                            E-010           1,287                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            GC-004          1,622                  11/30/09     /  /      G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-009              0                  02/22/10   04/13/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-013         27,078                  02/22/10   04/13/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-015              0                  02/22/10   03/22/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-017          8,070                  02/22/10   03/22/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-025         15,053                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-028         10,345                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-032          1,229                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-035          1,258                  07/14/10   09/01/10    G M CRISALLI & ASSOC.S              
                                                            GC-039          1,694                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-043         -2,150                  04/12/11   05/10/11    G.M. CRISALLI & ASSOCIATES INC      
                                                            H-001               0                  11/30/09   01/04/10    M&N PLUMBING & HEATING INC          
                                                            H-006           5,649                  02/22/10   04/13/10    M&N PLUMBING & HEATING INC          
                                                            H-009            -240                  04/20/10   08/04/10    M&N PLUMBING & HEATING INC          
                                                            P-002           3,428                  03/05/10   04/28/10    OSWEGO MECHANICAL INC               
                                                            R-001         -31,565                  07/14/10   09/01/10    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-003         -10,035                  07/14/10   09/01/10    EV ROOFING & CONSTRUCTION SUPPLY    
 
08-0124   Reconstruction               0-003-009  03/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0573   Reconstruction               0-003-010  02/03/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  07/26/22   05/22/23    C&STech Resources                   
                                                            EC-03               0                  05/22/23   12/28/23    C&S TECHNICAL RESOURCES             
                                                            EC-04         -30,830                  05/22/23   12/28/23    C&S TECHNICAL RESOURCES             
                                                            GC-01               0                  03/06/23   12/18/23    MURNANE BUILDING CONTRACTORS        
                                                            GC-01               0                  05/09/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-02               0                  07/26/22   12/22/23    Murmane Bldg Contrs                 
                                                            GC-02               0                  05/09/23     /  /      MURNANE BUILDING CONTRACTOR         
                                                            GC-03               0                  07/26/22     /  /      Murnane Bldg Contrs                 
                                                            GC-04               0                  07/26/22   05/17/23    Murnane Bldg Contrs                 
                                                            GC-05               0                  07/26/22   05/17/23    Murnane Bldg Contrs                 
                                                            GC-06               0                  07/26/22   05/17/23    Murnane Bldg Contrs                 
                                                            GC-07               0                  05/22/23   12/27/23    MURNANE BUILDING CONTRACTORS        
                                                            GC-08          15,213                  05/22/23   12/27/23    MURNANE BUILDING CONTRACTORS        
                                                            GC-09           7,140                  07/17/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-10           8,453                  07/17/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-11          30,553                  07/17/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-12          12,161                  07/17/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-13          21,284                  07/17/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-14           7,064                  07/17/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-16           7,945                  07/17/23     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-16           7,945                  07/17/23     /  /      MURNANE BUILDING                    
                                                            HC-01               0                  05/22/23   12/28/23    ERIE MECHANICAL CONTRACTORS         
                                                            HC-02         -73,588                  05/22/23   12/28/23    ERIE MECHANICAL CONTRACTORS         
                                                            PC-01               0                  05/22/23     /  /      HMI MECHANICAL SYSTEMS              
                                                            PC-01           4,840                  05/22/22   12/28/23    HMI Mechanical                      
                                                            PC-03          -6,810                  05/22/23   12/28/23    HMI MECHANICAL SYSTEM               
                                                            RC-01         -60,500                  05/22/23   12/27/23    EV ROOFING                          
                                                            RC-02               0                  05/22/23   12/27/23    EV ROOFING                          
                                                            RC-03           7,289                  05/22/23   12/27/23    EV ROOFING                          
                                                            RC-04          -1,882                  05/22/23   12/27/23    EV ROOFING                          
                                                            ec-02               0                  05/22/23   12/28/23    C&S TECHNICAL RESOURCES             
 
22-0022FC Reconstruction               0-003-011  12/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fremont Elementary School:
00-1853   Reconstruction               0-014-003  12/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             5,216                  07/31/03   08/04/03    PAC Assoc. of Oswego                
                                                            001            17,461                  10/06/03   01/08/04    Edward Joy                          
                                                            001              -144                  10/14/03   11/05/03    LaFrance Plumbing                   
                                                            002             1,625                  11/17/03   11/21/03    RG Burns Elec.                      
                                                            003             6,532                  11/17/03   11/21/03    RG Burns Elec.                      
                                                            004                 0                  09/09/03   09/19/03    PAC Assoc. of Oswego                
                                                            004            12,095                  03/22/04   04/30/04    LaFrance Plumbing                   
                                                            005             5,094                  09/09/03   09/19/03    PAC Assoc. of Oswego                
                                                            006             2,213                  03/22/04   04/30/04    Edward Joy                          
                                                            006               785                  03/23/04   04/30/04    RG Burns Elec.                      
                                                            008             8,497                  11/17/03   11/21/03    PAC Assoc. of Oswego                
                                                            008             5,014                  05/26/04   07/22/04    LaFrance Plumbing                   
                                                            009            12,467                  03/23/04   04/30/04    RG Burns Elec.                      
                                                            010             3,221                  08/30/04   09/16/04    LaFrance Plumbing                   
                                                            010             3,525                  12/06/04   12/17/04    Edward Joy                          
                                                            011             6,116                  12/08/03   03/30/04    PAC Assoc. of Oswego                
                                                            011             3,131                  12/10/04   12/28/04    RG Burns Elec.                      
                                                            015            12,669                  03/23/04   04/06/04    PAC Assoc. of Oswego                
                                                            015            12,191                  04/04/05   04/27/05    Edward Joy Co                       
                                                            016             8,129                  03/23/04   04/06/04    PAC Assoc. of Oswego                
                                                            019             3,758                  03/24/04   04/06/04    PAC Assoc. of Oswego                
                                                            023             6,133                  05/26/04   07/22/04    PAC Assoc. of Oswego                
                                                            027             5,501                  08/30/04   09/16/04    PAC Assoc. of Oswego                
                                                            030             9,300                  12/06/04   12/17/04    Pac Assoc. of Oswego                
                                                            033               548                  05/04/05   05/31/05    PAC Associates of Oswego            
 
05-1113   Reconstruction               0-014-004  05/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0490   Reconstruction               0-014-005  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-017          5,275                  01/21/09     /  /      R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            SC-001         -1,170                  02/16/10   04/14/10    LAN-CO COMPANIES                    
 
08-0027   Reconstruction               0-014-006  02/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0125   Reconstruction               0-014-007  03/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006             7,535                  07/25/11   09/02/11    JAG ENVIRONMENTAL INC               
 
19-0522   Additions and Alterations    0-014-008  01/31/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-11-34            0                  12/23/21   12/27/22    PAC Assoc of Oswego Inc             
                                                            AA11-05             0                  12/16/21   01/24/23    Myriad Const                        
                                                            AA11-09             0                  12/16/21   09/27/22    DW&Crew Mech Inc                    
                                                            AAEC11-1            0                  11/15/21   12/08/22    Myriad Const                        
                                                            AAEC11-3            0                  11/15/21   12/08/22    Myriad Const                        
                                                            AAEC11-5            0                  12/14/21   10/11/22    Myriad Const                        
                                                            AAEC11-7            0                  12/14/21   01/24/23    Myriad Const                        
                                                            AAG11-19            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-21            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-24            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-25            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-27            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-28            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-30            0                  12/23/21   12/27/22    PAC Assoc of Oswego                 
                                                            AAG11-31            0                  12/23/21   12/27/22    PAC Assoc of Oswego Inc             
                                                            AAG11-32            0                  12/23/21   12/27/22    PAC Assocs of Oswego                
                                                            AAG13-02            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAGC11-1            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AAGC1129            0                  12/23/21   12/27/22    PAC Associates of Oswego Inc.       
                                                            AAGC13-1            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAHC11-1            0                  11/15/21   12/09/22    CW&Crew Mech Inc                    
                                                            AAHC11-4            0                  11/15/21   12/09/22    DW&Crew Mech, Inc                   
                                                            AAHC11-6            0                  11/15/21   12/09/22    DW&Crew Mech, Inc                   
                                                            AAHC11-8            0                  12/14/21   01/24/23    DW&Crew Mech Inc                    
                                                            AAHC11-9            0                  12/14/21   01/24/23    DW&Crew Mech Inc                    
                                                            AAPC11-2            0                  11/15/21   12/09/22    Brosh Mech, Inc                     
                                                            AAPC11-4            0                  11/15/21   12/09/22    Brosh Mech Inc                      
                                                            AAPC11-7            0                  12/14/21   01/24/23    Brosh Mech Inc                      
                                                            AAPC11-8            0                  12/14/21   01/24/23    Brosh Mech Inc                      
                                                            AGC11-02            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-03            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-04            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-06            0                  11/15/21   12/08/22    PAC Assoc of Osego Inc              
                                                            AGC11-07            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-10            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-11            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-11            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-12            0                  11/15/21   12/14/22    PAC Assoc of Oswego Inc             
                                                            AGC11-13            0                  11/15/21   12/14/22    PAC Assoc of Oswego Inc             
                                                            AGC11-14            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-15            0                  11/15/21   12/08/22    PAC Assoc of oswego Inc             
                                                            AGC11-16            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AGC11-18            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            APC11-12            0                  12/14/21   01/24/23    Brosh Mech Inc                      
                                                            EC-01         -34,016                  12/14/21   01/24/23    Myriad Const                        
                                                            EC-03          15,000                  12/14/21   01/24/23    Myriad Const                        
                                                            EC-04               0                  12/14/21   01/24/23    Myriad Const                        
                                                            GC-01          45,000                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            GC-02          13,000                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            GC-03          31,078                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            GC-04         148,000                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            GC-05               0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            GC-07          35,090                  12/23/21   12/27/22    PAC Assoc of Oswego Inc             
                                                            GC-09          -1,366                  12/16/21   10/11/22    PAC Assoc of Osego Inc              
                                                            HC-01               0                  12/14/21   01/24/23    DW&Crew Mech Inc                    
                                                            PC-01               0                  12/23/21   10/04/22    Brosh Mech Inc                      
                                                            PC-02           5,553                  12/23/21   10/04/22    Brosh Mech Inc                      
                                                            PC-03            -317                  12/23/21   10/04/22    Brosh Mech Inc                      
                                                            RC-02         -64,553                  12/16/21   10/11/22    EV Roofing                          
 
22-0023FC Reconstruction               0-014-009  12/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Minoa Elementary School:
00-1854   Reconstruction               0-020-004  12/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            -7,942                  07/31/03   08/04/03    PAC & Assoc.                        
                                                            004             1,703                  11/17/03   11/21/03    RG Burns Elec.                      
                                                            005               842                  03/22/04   04/13/04    LaFrance Plumbing                   
                                                            006             4,028                  10/07/03   11/06/03    PAC & Assoc.                        
                                                            007             1,467                  03/22/04   04/30/04    Edward Joy                          
                                                            009             9,358                  11/17/03   11/21/03    PAC & Assoc.                        
                                                            011               -96                  08/30/04   09/16/04    LaFrance Plumbing                   
                                                            011             2,505                  12/06/04   12/17/04    Edward Joy                          
                                                            012            -3,716                  12/26/03   03/17/04    PAC & Assoc.                        
                                                            012               977                  12/10/04   12/28/04    RG Burns Elec.                      
                                                            015                 0                  04/04/05   04/27/05    RG burns Electric                   
                                                            016             8,656                  04/04/05   04/27/05    Edward Joy                          
                                                            016             6,240                  04/04/05   04/27/05    RG burns Electric Inc               
                                                            017              -867                  04/04/05   04/27/05    RG bruns Electric                   
                                                            020               880                  03/23/04   04/06/04    PAC & Assoc.                        
                                                            028               987                  08/30/04   09/16/04    PAC & Assoc.                        
 
05-1114   Reconstruction               0-020-005  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-001          38,997                  02/25/10   03/30/10    DEWALD ROOFING CO INC               
                                                            R-001A          1,918                  02/25/10   03/30/10    DEWALD ROOFING CO INC               
 
06-0491   Reconstruction               0-020-006  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-016          5,726                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            S-001           6,077                  02/23/10   03/25/10    LAN-CO COMPANIES                    
 
08-0028   Reconstruction               0-020-007  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-006          5,639                  03/10/10   05/24/10    ABSCOPE ENVIRONMENTAL INC           
                                                            E-009             538                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            GC-003          8,844                  11/30/09   01/04/10    G.M. CRISALLI & ASSOCIATES INC      
 
08-0126   Reconstruction               0-020-008  03/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005             8,525                  07/25/11   09/02/11    JAG ENVIRONMENTAL INC               
 
20-0574   Additions and Alterations    0-020-009  02/03/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AC-01               0                  07/18/22   05/10/23    Midantic Environmental Inc          
                                                            AC-01               0                  03/06/23   12/15/23    MIDLANTIC ENVIRONMENTAL INC         
                                                            AC-02          17,786                  07/18/22   03/23/23    Midantic Environmental Inc          
                                                            AC-03           1,950                  12/23/22   12/12/23    Midlanlic Environmental Inc         
                                                            AC-04          -5,170                  04/17/23   01/02/24    MIDLANTIC ENVIRONMENTAL             
                                                            EC-01               0                  07/18/22   03/23/23    Mynad Const                         
                                                            EC-02               0                  07/18/22   03/23/23    Myriad Const                        
                                                            EC-03               0                  07/26/22   05/04/23    Myriad Const                        
                                                            EC-04          16,984                  12/23/22   12/11/23    Myriad Const                        
                                                            EC-05          20,462                  12/23/22   12/11/23    Myriad Const                        
                                                            EC-06          12,620                  04/06/23   12/27/23    MYRIAD CONSTRUCTION                 
                                                            EC-07           5,988                  04/06/23   12/27/23    MYRIAD CONSTRUCTION                 
                                                            EC-08          11,542                  04/06/23   12/27/23    MYRIAD CONSTRUCTION                 
                                                            EC-09          11,394                  04/06/23   12/27/23    MYRIAD CONSTRUCTION                 
                                                            EC-11            -837                  04/17/23   12/27/23    MYRAID CONSTR.                      
                                                            GC-01               0                  07/18/22   05/10/23    PAC Assocs of Oswego Inc            
                                                            GC-02               0                  07/18/22   05/10/23    PAC Assocs of Oswego Inc            
                                                            GC-03               0                  07/18/22   05/10/23    PAC Assocs of Oswego Inc            
                                                            GC-04               0                  07/18/22   05/10/23    PAC Assocs of Oswego Inc            
                                                            GC-05               0                  07/18/22   05/10/23    PAC Assocs of Oswego Inc            
                                                            GC-05               0                  03/06/23   12/15/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-07               0                  03/06/23   12/15/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-09               0                  03/06/23   12/15/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-10               0                  03/06/23   12/15/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-11               0                  03/06/23   12/15/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-12               0                  03/06/23   12/15/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-13               0                  03/06/23   12/15/23    PAC ASSOCIATES OF OSWEGO INC        
                                                            GC-14               0                  12/23/22   12/12/23    PAC Assocs of Oswego Inc            
                                                            GC-15               0                  12/23/22   12/12/23    PAC Assocs of Oswego Inc            
                                                            GC-16          21,033                  12/23/22   12/12/23    PAC Assocs of Oswego Inc            
                                                            GC-17           9,492                  12/23/22   12/12/23    PAC Assocs of Oswego Inc            
                                                            GC-18          14,016                  12/23/22   12/12/23    PAC Assocs of Oswego Inc            
                                                            GC-19           7,243                  12/23/22   12/12/23    PAC Assocs of Oswego Inc            
                                                            GC-20          23,586                  12/23/22   12/12/23    PAC Assocs of Oswego Inc            
                                                            GC-21           8,151                  04/06/23   12/21/23    PAC ASSOCIATES OF OSWEGO            
                                                            GC-22           3,763                  04/06/23   12/21/23    PAC ASSOCIATES OF OSWEGO            
                                                            GC-23          18,239                  04/06/23   12/21/23    PAC ASSOCIATES OF OSWEGO            
                                                            GC-24            -438                  04/06/03   12/21/23    PAC ASSOCIATES OF OSWEGO            
                                                            HC-01               0                  12/23/22   12/11/23    Erie Mech Contrs                    
                                                            HC-03         -99,116                  04/17/23   12/27/23    ERIE MECHANICAL                     
                                                            PC-01               0                  07/18/22   03/23/23    Burns Bros Contrs                   
                                                            PC-02               0                  12/23/22   12/11/23    Burns Bros Contrs                   
                                                            PC-03           2,623                  12/23/22   12/11/23    Burns Bros Contrs                   
                                                            PC-04          24,373                  12/23/22     /  /      Burns Bros Contrs                   
                                                            PC-05           2,921                  12/23/22   12/11/23    Burns Bros Contrs                   
                                                            PC-06          14,979                  12/23/22     /  /      Burns Bros Contrs                   
                                                            PC-07           7,456                  12/23/22   12/11/23    Burns Bros Contrs                   
                                                            PC-08           6,684                  05/22/23   12/28/23    burns bros contractors              
                                                            SC-01               0                  04/17/23     /  /      MCGINNIS NELSON                     
                                                            SC-02               0                  04/17/23   01/02/24    MCGINNIS NELSON                     
                                                            SC-03               0                  04/17/23     /  /      MCGINNIS NELSON                     
                                                            SC-06          -2,436                  04/17/23   01/02/24    MCGINNIS NELSON                     
 
22-0024FC Reconstruction               0-020-010  12/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Central High School:
99-0892   Reconstruction               0-021-005  04/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1A-001         -4,257                  01/10/02   03/22/02    LandMark Ent.                       
                                                            1A-001         43,930                  01/10/02   03/22/02    LandMark Ent.                       
                                                            1A001         989,200                  09/10/01   01/09/02    LandMark Ent.                       
                                                            1A001          17,133                  09/10/01   01/09/02    LandMark Ent.                       
                                                            1A003          -1,998                  08/21/01   01/09/02    Masa Const.                         
                                                            1A05-002       26,589                  10/05/01   05/22/02    A. Pompo Elec.                      
 
00-0954   Additions and Alterations    0-021-006  07/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001             8,700                  07/23/02   08/16/02    Hueber Breuer Const.                
                                                            001                 0                  07/23/02   08/16/02    Green Plumbing                      
                                                            001                 0                  07/23/02   08/16/02    Edgeline Elec.                      
                                                            001            11,900                  07/23/02   08/16/02    Bennington Iron Works               
                                                            001            19,067                  09/06/02   10/29/02    Edward Joy                          
                                                            001            84,342                  09/30/02   10/23/03    Dant Clayton                        
                                                            002             1,009                  07/23/02   08/16/02    Edgeline Elec.                      
                                                            002           -41,267                  08/14/02   11/01/02    Hueber Breuer Const.                
                                                            002                 0                  11/12/02   01/10/03    Edward Joy                          
                                                            002             3,987                  11/22/02   12/09/02    Dant Clayton                        
                                                            002             4,606                  12/06/02   01/07/03    Bennington Iron Works               
                                                            002             6,046                  08/05/03   08/14/03    Green Plumbing                      
                                                            003                 0                  09/06/02   10/29/02    Edgeline Elec.                      
                                                            003             4,735                  09/06/02   10/29/02    Hueber Breuer Const.                
                                                            003             6,598                  11/12/02   01/10/03    Edward Joy                          
                                                            003             2,561                  02/03/03   03/04/03    Bennington Iron Works               
                                                            004             4,617                  11/04/02   01/07/03    Hueber Breuer Const.                
                                                            004                 0                  11/12/02   01/10/03    Edward Joy                          
                                                            004                 0                  12/20/02   01/03/03    Edgeline Elec.                      
                                                            004            10,238                  10/06/03   12/05/03    Green Plumbing                      
                                                            005            12,504                  11/12/02   01/10/03    Hueber Beuer Const.                 
                                                            005                 0                  01/22/03   02/10/03    Edward Joy                          
                                                            005                 0                  02/03/03   03/04/03    Edgeline Elec.                      
                                                            005             5,040                  07/31/03   11/26/03    Benninton Iron Works                
                                                            005             6,563                  12/08/03   06/14/07    Green Plumbing                      
                                                            006                 0                  11/12/02   01/10/03    Hueber Breuer Const.                
                                                            006                 0                  05/09/03   05/27/03    Edgeline Elec.                      
                                                            006             6,071                  10/07/03   12/05/03    Edward Joy                          
                                                            006             3,810                  03/22/04   04/06/04    Bennington Iron Works               
                                                            006            13,132                  05/26/04   05/27/04    Green Plumbing                      
                                                            007                 0                  11/12/02   01/10/03    Hueber Breuer Const.                
                                                            007               439                  05/09/03   05/27/03    Edgeline Elec.                      
                                                            007             3,463                  05/12/03   05/27/03    Edward Joy                          
                                                            007            10,686                  05/26/04   05/27/04    Green Plumbing                      
                                                            008                 0                  12/06/02   01/07/03    Hueber Breuer Const.                
                                                            008             8,530                  05/28/03   06/03/03    Edward Joy                          
                                                            008                 0                  12/02/04   12/10/04    Green Plumbing                      
                                                            009            16,839                  12/10/02   01/09/03    Hueber Breuer Const.                
                                                            009            14,955                  05/28/03   06/03/03    Edgeline Elec.                      
                                                            009             5,482                  10/07/03   01/24/07    Edward Joy                          
                                                            010             7,662                  12/06/02   01/07/03    Hueber Breuer Const.                
                                                            010                 0                  09/09/03   12/11/03    Edgeline Elec.                      
                                                            010            11,363                  10/07/03   06/14/07    Edward Joy                          
                                                            011                 0                  02/03/03   03/04/03    Hueber Breuer Const.                
                                                            011             9,907                  10/07/03   12/05/03    Edward Joy                          
                                                            011             4,871                  10/06/03   10/27/03    Edgeline Elec.                      
                                                            012             5,261                  02/03/03   03/04/03    Hueber Breuer Const.                
                                                            012               964                  11/17/03   01/08/04    Edward Joy                          
                                                            012            -1,521                  03/22/04   04/28/04    Edgeline Elec.                      
                                                            013             6,053                  12/08/03   04/23/04    Edward Joy                          
                                                            013             3,561                  03/22/04   04/28/04    Edgeline Elec.                      
                                                            014            19,448                  05/12/03   05/27/03    Hueber Breuer Const.                
                                                            014            21,972                  03/22/04   04/28/04    Edward Joy                          
                                                            014            11,629                  05/26/04   05/27/04    Edgeline Elec.                      
                                                            015            19,493                  03/22/04   04/28/04    Edward Joy                          
                                                            015                 0                  08/31/04   09/23/04    Edgeline Elec.                      
                                                            016            -3,576                  05/28/03   06/03/03    Hueber Breuer Const.                
                                                            016             9,640                  08/31/04   09/23/04    Edgeline Elec.                      
                                                            016                 0                  12/06/04   12/10/04    Edward Joy                          
                                                            017             1,951                  05/28/03   06/03/03    Hueber Breuer Const.                
                                                            017                 0                  12/02/04   12/10/04    Edgeline Elec.                      
                                                            017               381                  12/06/04   12/10/04    Edward Joy                          
                                                            018             9,002                  08/05/03   08/14/03    Hueber Breuer Const.                
                                                            019           -15,731                  08/05/03   08/14/03    Hueber Breuer Const.                
                                                            020            11,381                  09/09/03   11/17/03    Hueber Breuer Const.                
                                                            021            12,323                  09/09/03   11/17/03    Hueber Breuer Const.                
                                                            022               276                  09/09/03   11/17/03    Hueber Breuer Const.                
                                                            023            28,000                  10/14/03   10/23/03    Hueber Breuer Const.                
                                                            024            36,313                  03/22/04   04/06/04    Hueber Breuer Const.                
                                                            025             8,479                  03/22/04   04/06/04    Hueber Breuer Const.                
                                                            026            13,748                  03/22/04   04/06/04    Hueber Breuer Const.                
                                                            027            -6,429                  03/22/04   04/06/04    Hueber Breuer Const.                
                                                            028            14,671                  05/28/04   06/09/04    Hueber Breuer Const.                
                                                            029             9,748                  05/28/04   06/09/04    Hueber Breuer Const.                
                                                            030            57,717                  12/06/04   12/10/04    Hueber Breuer Const.                
                                                            031            13,617                  12/06/04   12/10/04    Hueber Breuer Const.                
                                                            032                 0                  04/04/05   05/02/05    Hueber Breuer Construction          
                                                            033            78,183                  04/04/05   05/02/05    Hueber Breuer Construction          
                                                            034            16,503                  04/04/05   06/21/05    Hueber Breuer Construction          
 
02-1755   Reconstruction               0-021-007  04/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1115   Reconstruction               0-021-008  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            T-005          10,090                  02/28/08   03/08/08    PRIORITY CONNECTIONS                
 
06-0492   Reconstruction               0-021-009  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2.12-001       18,000                  02/27/08   03/08/08    davis wallbridge                    
                                                            2.12-002       15,267                  02/27/08   03/08/08    davis wallbridge                    
                                                            GC-006         12,144                  02/25/08   03/08/08    R.J ortlieb construction            
                                                            GC-011         19,000                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-018          1,315                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-025            357                  07/23/09   08/04/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-027         13,466                  11/12/09   12/18/09    R.J. ORTLIEB CONSTRUCTION CO INC    
                                                            H-002             858                  11/12/08   02/05/09    EDWARD JOY COMPANY                  
                                                            R-001         -31,567                  02/27/08   03/08/08    APPLE ROOFING CORP                  
 
07-1588   Reconstruction               0-021-010  12/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO R-001       21,689                  02/22/10   05/27/10    COMMERCIAL ROOFING & SHEET METAL INC
                                                            DW-003          1,135                  07/29/09   08/13/09    DAVIS WALLBRIDGE, INC.              
                                                            P-003          18,135                  02/22/10   05/27/10    OSWEGO MECHANICAL INC               
                                                            S-001         101,651                  07/29/09   08/13/09    RITTER & PARATORE CONTRACTING, INC. 
                                                            S-002               0           9,532  04/20/10   08/23/10    RITTER & PARATORE CONTRACTING INC   
                                                            S-003         -40,075                  04/20/10   08/23/10    RITTER & PARATORE CONTRACTING INC   
 
08-0029   Reconstruction               0-021-011  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-001              0                  07/23/09   08/11/09    ABSCOPE ENVIRONMENTAL, INC.         
                                                            AA-003              0                  11/29/10   12/21/10    ABSCOPE ENVIRONMENTAL INC           
                                                            E-002          19,494                  03/05/10   04/28/10    KNAPP ELECTRIC INC                  
                                                            E-003           8,327                  02/22/10   05/21/10    KNAPP ELECTRIC INC                  
                                                            E-006           4,149                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            E-007           1,412                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            E-012               0                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            E-014           2,351                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            E-015           8,520                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            E-016           8,585                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            E-017             355                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            GC-002          7,455                  11/30/09   01/04/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-005          9,909                  11/30/09   01/04/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-008              0                  02/22/10   04/13/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-011              0                  02/22/10   04/13/10    G.M. CRISALLI & ASSOCIATES          
                                                            GC-014         27,163                  02/22/10   04/13/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-016         12,390                  02/22/10   03/22/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-020          6,201                  02/22/10   03/22/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-021            803                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-024          9,927                  07/15/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-030          9,523                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-034          3,640                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-041          5,984                  09/10/10   09/28/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            H-003               0                  04/30/10   08/04/10    M&N PLUMBING & HEATING INC          
                                                            H-005           6,218                  04/20/10   08/04/10    M&N PLUMBING & HEATING INC          
                                                            H-007           4,928                  04/20/10   08/04/10    M&N PLUMBING & HEATING INC          
 
08-0127   Reconstruction               0-021-012  03/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-004         36,400                  02/23/10   03/23/10    JAG ENVIRONMENTAL INC               
                                                            AA-009        -10,000                  01/24/11   02/24/11    JAG ENVIRONMENTAL INC               
 
16-1253   Reconstruction               0-021-014  02/18/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0548   Reconstruction               0-021-015  12/10/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FL-01          13,354                  10/17/19   12/16/19    TRI-COUNTY CARPETS & LINOLEUM,INC.  
                                                            FL-02          -4,000                  10/17/19   12/16/19    TRI-COUNTY CARPETS & LINOEUM,INC.   
 
19-0670   Reconstruction               0-021-016  01/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FL-01          10,479                  08/11/20   09/24/20    TRI-COUNTY CARPETS & LINOLEUM, INC. 
                                                            FL-02          12,429                  09/11/20   11/12/20    TRI-COUNTY CARPETS & LINOLEUM, INC. 
 
20-0872   Reconstruction               0-021-017  03/01/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FL-01          -4,000                  06/29/21   04/04/22    Corporate Floors USA                
 
21-1588   Reconstruction               0-021-018  05/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0025FC Reconstruction               0-021-019  12/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0376   Reconstruction               0-021-021  11/20/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2097   Reconstruction               0-021-022  06/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2329   Reconstruction               0-021-023  07/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pine Grove Middle:
00-0038   Reconstruction               0-023-002  05/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  11/17/03   01/08/04    Burns Elec.                         
                                                            002            17,520                  10/06/03   06/14/07    Edward Joy                          
                                                            002             2,402                  10/14/03   10/23/03    LaFrance Plumbing                   
                                                            003             1,493                  07/31/03   08/15/03    PAC Associates                      
                                                            005             3,479                  12/08/03   03/15/04    Edward Joy                          
                                                            006             2,279                  03/22/04   04/28/04    LaFrance Plumbing                   
                                                            007             1,967                  03/23/04   04/28/04    Burns Elec.                         
                                                            008             1,626                  03/22/04   04/28/04    Edward Joy                          
                                                            009               -91                  05/26/04   05/27/04    LaFrance Plumbing                   
                                                            010            -6,209                  11/17/03   12/26/03    PAC Associates                      
                                                            010             3,610                  03/23/04   04/28/04    Burns Elec.                         
                                                            012             3,293                  08/30/04   09/23/04    LaFrance Plumbing                   
                                                            012             9,832                  12/06/04   12/10/04    Edward joy                          
                                                            013             1,903                  12/08/03   03/15/04    PAC Associates                      
                                                            013             6,709                  04/04/05   04/18/05    RG Burns Electric                   
                                                            017             8,074                  03/23/04   04/06/04    PAC Associates                      
                                                            017             7,128                  04/04/05   06/21/05    Edward Joy                          
                                                            021             1,813                  03/23/04   04/06/04    PAC Associates                      
                                                            024            12,950                  05/26/04   05/27/04    PAC Associates                      
                                                            029             3,557                  08/30/04   09/23/04    PAC Associates                      
                                                            031             6,432                  12/06/04   12/10/04    PAC Associates                      
 
02-1756   Reconstruction               0-023-003  04/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1116   Reconstruction               0-023-005  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           1,256                  01/11/07   01/24/07    Edgeline Electrica                  
                                                            S-002          19,103                  01/11/07   03/14/07    Paul Vitale inc                     
                                                            S-004          10,333                  05/15/07   06/22/07    Paul Vitale In c                    
                                                            S-005           6,081                  02/25/08   03/08/08    paul f vitale                       
                                                            S-006          19,362                  02/25/08   03/08/08    paul f vitale                       
                                                            S-007           5,421                  02/25/08   03/08/08    paul f vitale                       
                                                            S-008           7,362                  02/25/08   03/08/08    paul f vitale                       
                                                            S-009           2,216                  04/20/09   07/30/09    PAUL F. VITALE INC.                 
                                                            S-1            19,800                  01/11/07   03/13/07    Paul Vitale                         
                                                            T-009             807                  04/20/09   07/30/09    PRIORITY CONNECTIONS                
 
06-0493   Reconstruction               0-023-006  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-008         13,126                  02/25/08   03/08/08    R.J ortlieb construction            
 
08-0128   Reconstruction               0-023-007  03/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-002          3,800                  02/23/10   03/23/10    JAG ENVIRONMENTAL INC               
 
13-0767   Additions and Alterations    0-023-008  04/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001              0                  08/15/16   09/30/16    Knapp Electric                      
                                                            EC-002              0                  08/15/16   09/30/16    Knapp Electric                      
                                                            EC-003              0                  08/15/16   09/30/16    Knapp Electric                      
                                                            EC-004              0                  08/15/16   09/30/16    Knapp Electric                      
                                                            EC-005         21,694                  08/15/16   09/30/16    Knapp Electric                      
                                                            EC-006              0                  01/05/17   01/06/17    Knapp Electric                      
                                                            EC-007              0                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-008         10,009                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-009          8,160                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-010         20,780                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-011         25,669                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-012         20,527                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-013         24,467                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-014         24,587                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-015         24,859                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-016         22,115                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-017         33,323                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-018         18,010                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-019         34,069                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-020         32,535                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-021         27,314                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-022           -172                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-023         23,585                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            EC-024          3,279                  01/05/17   01/06/17    Knapp Electric, Inc.                
                                                            FS-001              0                  08/15/16   09/30/16    Joseph Flihan Company               
                                                            FS-002         14,950                  08/15/16   09/30/16    Joseph Flihan Company               
                                                            FS-003         16,480                  08/15/16   09/30/16    Joseph Flihan Company               
                                                            FS-004            677                  01/05/17   01/09/17    Joseph Filhan Company               
                                                            FS-005         10,985                  01/05/17   01/09/17    Joseph Filhan Company               
                                                            GC-001         11,400                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-002              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-003              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-004              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-005              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-006         27,256                  03/26/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-007              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-008              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-009              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-010         18,801                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-011         19,087                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-012              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-013              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-014         34,977                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-015              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-016              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-017              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-018              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-019              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-020              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-021              0                  03/28/16   07/07/16    PAC & Associates of Oswego          
                                                            GC-022              0                  08/15/16   09/30/16    PAC & Associates of Oswego          
                                                            GC-023              0                  08/15/16   09/30/16    PAC & Associates of Oswego          
                                                            GC-024              0                  08/15/16   09/30/16    PAC & Associates of Oswego          
                                                            GC-025              0                  08/15/16   09/30/16    PAC & Associates of Oswego          
                                                            GC-026         34,239                  08/15/16   09/30/16    PAC & Associates of Oswego          
                                                            GC-027         31,065                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-028              0                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-029         29,215                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-030         20,746                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-031         17,082                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-032         23,206                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-033         24,989                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-034         23,058                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-035         23,835                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-036         23,113                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-037         22,129                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-038         27,835                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-039         24,084                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-040         16,686                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-041         23,406                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-042        197,114                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-043         28,153                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-045         -4,570                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            GC-046         -5,390                  01/05/17   01/09/17    PAC & Associates of Oswego, Inc.    
                                                            HC-001              0                  01/05/17   01/09/17    C&S Technical Resources, Inc.       
                                                            HC-002              0                  01/05/17   01/09/17    C&S Technical Resources, Inc.       
                                                            HC-003              0                  01/05/17   01/09/17    C&S Technical Resources, Inc.       
                                                            HC-004              0                  01/05/17   01/06/17    C&S Technical Resources, Inc.       
                                                            HC-005              0                  01/05/17   01/06/17    C&S Technical Resources, Inc.       
                                                            HC-006        -50,124                  01/05/17   01/06/17    C&S Technical Resources, Inc.       
                                                            PC-001              0                  01/05/17   01/09/17    H.J. Brandeles Corporation          
                                                            PC-002        -34,513                  01/05/17   01/09/17    H.J. Brandeles Corporation          
                                                            SR-001         -4,766                  01/05/17   01/09/17    Syracuse Scenery & Stage Lighting   
 
14-0742   Reconstruction               0-023-009  11/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  03/27/15   04/13/15    PAC & Associates of Oswego          
                                                            GC-002         -2,597                  03/27/15   04/13/15    PAC & Associates of Oswego          
 
16-0902   Reconstruction               0-023-010  01/11/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M-01             -355                  07/11/18   08/01/18    DW & CREW MECHANICALS INC           
                                                            M-02            3,867                  07/11/18   08/01/18    DW & CREW MECHANICALS INC           
                                                            M-03                0                  07/11/18   08/01/18    DW & CREW MECHANICALS INC           
                                                            M-04           -4,072                  07/11/18   08/01/18    DW& CREW MECHANICALS INC            
 
02-1151FP Reconstruction               0-023-FP1  01/11/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Woodland Elementary:
00-0039   Reconstruction               0-024-002  05/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            18,021                  10/06/03   06/14/07    Edward Joy                          
                                                            003             1,560                  10/14/03   10/23/03    LaFrance Plumbing                   
                                                            004            13,629                  11/17/03   01/08/04    Edward Joy                          
                                                            005                93                  11/17/03   01/08/04    Burns Elec.                         
                                                            007            -1,120                  09/09/03   11/17/03    PAC Associates                      
                                                            007             1,434                  03/22/04   04/28/04    LaFrance Plumbing                   
                                                            008             4,277                  03/23/04   04/28/04    Burns Elec.                         
                                                            009             4,498                  03/22/04   04/28/04    Edward Joy                          
                                                            013            -2,753                  08/30/04   09/23/04    LaFrance Plumbing                   
                                                            013            11,139                  12/06/04   12/10/04    Edward Joy                          
                                                            014             7,022                  12/08/03   03/15/04    PAC Associates                      
                                                            014            12,243                  12/06/04   12/10/04    Edward Joy                          
                                                            014             1,021                  04/04/05   06/21/05    RG burns Electric                   
                                                            014             2,319                  05/04/05   07/20/05    LaFrance Plumbing Heating           
                                                            018             3,956                  03/23/04   04/06/04    PAC Associates                      
                                                            022             4,668                  03/23/04   04/06/04    PAC Associates                      
                                                            025             2,869                  05/26/04   05/27/04    PAC Associates                      
                                                            026           -44,814                  05/26/04   05/27/04    PAC Associates                      
                                                            032             1,830                  12/06/04   12/10/04    PAC Associates                      
 
02-1757   Reconstruction               0-024-003  04/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-1             4,483                  12/09/04   12/24/04    J&B Installations                   
 
05-1117   Reconstruction               0-024-004  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            T-002          10,398                  02/27/07   03/01/07    Priority Connection                 
                                                            T-003        -161,215                  02/27/07   03/01/07    Priority Connection                 
 
06-0494   Alterations                  0-024-005  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-015          5,000                  07/23/09   08/11/09    R.J. ORRLIEB CONSTRUCTION CO., INC. 
                                                            GC-026            567                  07/23/09   08/04/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            W-001          69,660                  11/12/09   03/12/10    JMG GLASS & GLAZING INC             
 
08-0030   Reconstruction               0-024-006  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AAG11-29            0                  12/23/21     /  /      PAC Assoc of Oswego Inc             
                                                            E-004          -7,948                  03/05/10   04/28/10    KNAPP ELECTRIC INC                  
                                                            E-013               0                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            GC-010              0                  02/22/10   04/13/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-019          3,297                  02/22/10   03/22/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-026          8,854                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-031          1,806                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-037          2,026                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-040            432                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-23           1,844                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
 
08-0129   Reconstruction               0-024-007  03/30/09  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0523   Additions and Alterations    0-024-008  01/31/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAEC11-2            0                  11/15/21   12/08/22    Myriad Const                        
                                                            AAEC11-4            0                  11/15/21   12/08/22    Myriad Const                        
                                                            AAEC11-8            0                  12/14/21   09/27/22    Myrid Const                         
                                                            AAG11-20            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-22            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-23            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAG11-26            0                  12/14/21   01/24/23    PAC Assoc of Oswego Inc             
                                                            AAGC11-5            0                  11/15/21     /  /      PAC Assoc of Oswego Inc             
                                                            AAGC11-8            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            AAGC11-9            0                  11/15/21   12/08/22    PAC Assoc of oswego Inc             
                                                            AAHC11-2            0                  11/15/21   12/08/22    DW&Crew Mech, Inc                   
                                                            AAHC11-3            0                  11/15/21   12/08/22    DW&Crew Mech, Inc                   
                                                            AAHC11-5            0                  11/15/21   12/08/22    DW& Crew Mech, Inc                  
                                                            AAHC11-7            0                  12/14/21   01/24/23    DW&Crew Mech Inc                    
                                                            AAP11-10            0                  12/14/21   01/24/23    Brosh Mech Inc                      
                                                            AAP11-11            0                  12/14/21   01/24/23    Brosh Mech Inc                      
                                                            AAPC11-1            0                  11/15/21   12/12/22    Brosh Mech, Inc                     
                                                            AAPC11-3            0                  11/15/21   12/12/22    Brosh Mech, Inc                     
                                                            AAPC11-5            0                  11/15/21   12/08/22    Brosh Mech, Inc                     
                                                            AAPC11-6            0                  11/15/21   12/08/22    Brosh Mech, Inc                     
                                                            AAPC11-9            0                  12/14/21   01/24/23    Brosh Mech Inc                      
                                                            AGC11-17            0                  11/15/21   12/08/22    PAC Assoc of Oswego Inc             
                                                            EC-02          13,400                  12/14/21   09/27/22    Myriad Const                        
                                                            GC-06          35,090                  12/23/21   12/27/22    PAC Assoc of Oswego Inc             
                                                            GC-08           6,130                  12/23/21   12/27/22    PAC Assoc of Oswego Inc             
 
22-0026FC Reconstruction               0-024-009  12/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Office:
05-1118   Reconstruction               1-004-003  05/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0495   Reconstruction               1-004-004  03/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0031   Reconstruction               1-004-005  02/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-002              0                  07/23/09   08/11/09    ABSCOPE ENVIRONMENTAL, INC.         
                                                            AA-003          6,940                  12/23/10   01/20/11    JAG ENVIRONMENTAL INC               
                                                            AA-005              0                  03/10/10   05/24/10    ABSCOPE ENVIRONMENTAL INC           
                                                            E-001               0                  11/30/09   01/08/10    KNAPP ELECTRIC INC                  
                                                            E-005           1,665                  03/05/10   04/28/10    KNAPP ELECTRIC INC                  
                                                            E-008           2,663                  07/13/11   07/27/11    KNAPP ELECTRIC INC                  
                                                            E-011               0                  07/13/11     /  /      KNAPP ELECTRIC INC                  
                                                            GC-001          2,019                  11/30/09   01/04/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-006              0                  02/22/10   04/30/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-012              0                  02/22/10   05/24/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-018              0                  02/22/10   03/22/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-022          7,589                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-027         -5,275                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-033         -1,211                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-036         -1,532                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-038          6,623                  07/14/10   09/01/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            GC-042            981                  09/10/10   09/28/10    G.M. CRISALLI & ASSOCIATES INC      
                                                            H-002          33,777                  11/30/09   01/08/10    M&N PLUMBING & HEATING INC          
                                                            H-004               0                  02/22/10   04/13/10    M&N PLUMBING & HEATING INC          
                                                            H-008           8,451                  04/20/10   08/04/10    M&N PLUMBING & HEATING INC          
                                                            P-001               0                  03/05/10   04/28/10    OSWEGO MECHANICAL INC               
                                                            P-004          -5,140                  07/14/10   09/01/10    OSWEGO MECHANICAL INC               
                                                            R-004             550                  07/14/10   09/01/10    EV ROOFING & CONSTRUCTION SUPPLY    
 
08-0130   Reconstruction               1-004-006  03/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            007             4,939                  07/25/11   09/02/11    JAG ENVIRONMENTAL INC               
                                                            AA-003          6,940                  02/23/10   03/23/10    JAG ENVIRONMENTAL INC               
 

          Storage Building:
13-1286   New Construction             2-035-001  03/28/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-1337   Reconstruction               5-005-003  06/17/93  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1119   Additions and Alterations    5-005-008  05/12/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            T-004           7,071                  04/20/09   07/30/09    PRIORITY CONNECTIONS                
                                                            T-007           5,281                  04/20/09   07/30/09    PRIORITY CONNECTIONS                
                                                            T-008           1,658                  04/20/09   07/30/09    PRIORITY CONNECTIONS                
 
06-0496   Additions and Alterations    5-005-009  03/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           4,465                  07/23/09   08/11/09    RIDLEY ELECTRIC CO., INC.           
                                                            E-003           7,563                  07/23/09   08/04/09    RIDLEY ELECTRIC CO., INC.           
                                                            E-004           7,194                  07/23/09   08/04/09    RIDLEY ELECTRIC CO., INC.           
                                                            E-005          21,730                  09/23/10   10/01/10    RIDLEY ELECTRIC CO INC              
                                                            E-006            -794                  01/31/11   02/25/11    RIDLEY ELECTRIC CO INC              
                                                            GC-001         18,836                  02/25/08   03/15/08    R.J orlied construction             
                                                            GC-002         18,542                  02/25/08   03/08/08    R.J ortlieb construction            
                                                            GC-003         13,601                  02/25/08   03/08/08    R.J ortlieb construction            
                                                            GC-004          7,316                  02/25/08   03/19/08    R.J ortlieb construction            
                                                            GC-005          7,646                  02/25/08   03/19/08    R.J ortlieb construction            
                                                            GC-009         25,347                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-010         13,096                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-012          8,664                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-013          8,053                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-014          5,732                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-019          3,823                  01/21/09   03/06/09    R.J. ORTLILEB CONSTRUCTION CO., INC.
                                                            GC-020          6,011                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-021           -430                  01/21/09   03/06/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-022          1,424                  01/21/09   04/03/09    R.J. ORTLIEB CONSTRUCTION CO., INC. 
                                                            GC-024          8,114                  07/23/09   08/04/09    R.J. ORTLIEB CONSTRUCTION., INC.    
                                                            H-001          16,447                  11/12/08   08/19/11    EDWARED JOY COMPANY                 
                                                            P-001           2,317                  11/12/08   02/05/09    EDWARD JOY COMPANY                  
 
17-0495   Reconstruction               5-005-010  08/29/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-01           21,949                  12/26/17   01/23/18    Paragon Environmental Construction  
                                                            P-02           18,050                  12/26/17   01/23/18    Paragon Environmental Construction  
                                                            P-03           31,824                  12/26/17   01/23/18    Paragon Environmental Construction  
                                                            P-04           17,426                  12/26/17   01/23/18    Paragon Environmental Construction  
                                                            P-05            8,150                  01/16/18   01/31/18    Paragon Environmental Construction  
 
22-1304   Reconstruction               5-005-011  02/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stadium Concession Stand:
03-0616   New Construction             7-027-001  08/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
15-1391   Reconstruction               7-999-001  08/05/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXTemporary Administration Bldg:
14-1423SS Reconstruction               8-036-001  10/27/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          St. Matthews School:
19-1483   Reconstruction               8-037-L01  10/26/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lake Street Elem-ConstSwingSpace:
19-1484   Reconstruction               8-038-L01  02/26/20  NO CHANGE ORDERS ON ELECTRONIC FILE

JAMESVILLE-DEWITT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-04-11-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Dewitt Jr Sr High:
91-0793   Alterations                  0-002-006  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0690   Reconstruction               0-002-009  03/10/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1133   Reconstruction               0-002-010  03/24/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0117   Reconstruction               0-002-011  08/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0354   Reconstruction               0-002-012  05/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0900   Additions and Alterations    0-002-013  06/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-H11       -12,308                  10/31/05   11/04/05    Lawman heting cooling               
                                                            001-R11       -22,924                  08/17/05   08/31/05    EV Roofing Corp                     
                                                            001-W11        -6,819                  07/01/05   07/21/05    Flower City Glass                   
                                                            001BC-11       13,431                  12/04/03   03/15/04    Northland Assoc.                    
                                                            001E11        -22,383                  05/16/05   07/13/05    Eastcoast Electric                  
                                                            002 BC11       24,000                  03/01/04   04/07/04    Northland Assoc.                    
                                                            002-E11       -73,254                  02/06/06   03/02/06    East Coast Electric                 
                                                            002-P11        34,431                  03/04/04   05/27/04    Brosh Mech.                         
                                                            003BC-11       17,850                  12/14/04   12/23/04    Northland Assoc.                    
                                                            P11-003        21,637                  02/03/04   05/06/04    Brosh Mech.                         
                                                            P11-013       -15,719                  06/06/05   07/19/05    Brosh mechanical                    
                                                            S-11           63,616                  02/03/04   04/07/04    Ritter & Paratore                   
                                                            S-11           51,703                  08/05/04   09/09/04    Ritter & Paratore                   
 
04-0429   Reconstruction               0-002-014  01/27/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-H12        -7,868                  11/23/05   11/25/05    Airtech heating Airconditioning     
                                                            GC-12           3,517                  11/28/05   08/08/06    Bouley Associates                   
 
06-0733   Reconstruction               0-002-015  05/08/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC - 001       44,000                  10/01/07   11/07/07    ASHLEY MCGRAW ARCHITECTS            
                                                            P-003            -163                  04/01/08   08/07/08    TOWN MECHANICAL, INC.               
 
10-0985   Reconstruction               0-002-016  05/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R1-001         -3,339                  02/27/13   05/14/13    ELMER W DAVIS INC                   
                                                            R1-002        -26,475                  05/30/14   06/30/14    Elmer W. Danforth, Inc.             
                                                            SC-002          3,416                  03/08/13   05/17/13    SMITH SITE DEVELOPMENT LLC          
                                                            SC-006           -877                  03/08/13   05/17/13    SMITH SITE DEVELOPMENT LLC          
 
13-1264   Reconstruction               0-002-019  01/06/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             9,905                  11/02/15   12/02/15    Adhan Piping Co, Inc.               
                                                            002             8,538                  11/02/15   12/02/15    Adhan Piping Co, Inc.               
                                                            003             9,238                  11/02/15   12/02/15    Adhan Piping Co, Inc.               
                                                            004             6,259                  11/02/15   12/02/15    Adhan Piping Co, Inc.               
                                                            005             9,293                  11/02/15   12/02/15    Adhan Piping Co, Inc.               
                                                            006             9,435                  11/02/15   12/02/15    Adhan Piping Co, Inc.               
                                                            007             9,681                  11/02/15   12/02/15    Adhan Piping Co, Inc.               
                                                            1              27,840                  01/13/16   01/28/16    Concord Electric                    
                                                            10                  0                  01/13/16   01/28/16    Adhan Piping Co, Inc.               
                                                            8               5,343                  01/13/16   01/28/16    Adhan Piping Co, Inc.               
                                                            9               9,138                  01/13/16   01/28/16    Adhan Piping Co, Inc.               
 
16-1920   Reconstruction               0-002-020  03/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-004              0                  02/27/20   07/02/20    PATRICIA ELECTRIC, INC.             
                                                            FAC-005       -10,050                  01/10/20   01/28/20    PATRICIA ELECTRIC, INC.             
                                                            GC-001        -19,517                  03/27/19   03/27/19    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-003           -667                  01/13/20   02/13/20    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-004        -14,158                  01/13/20   02/04/20    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            HC-001           -562                  01/10/20   01/28/20    AIRSIDE TECHNOLOGY CORP.            
                                                            HC-002        -25,624                  01/10/20   01/28/20    AIRSIDE TECHNOLOGY CORP.            
                                                            SC-002          4,000                  03/27/19   04/01/19    PAUL F. VITALE, INC.                
                                                            SEC-001        14,720                  11/04/19   11/08/19    SYRACUSE SCENERY & STAGE LIGHTING CO
 
18-1697   Reconstruction               0-002-021  03/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0564   Reconstruction               0-002-022  12/12/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0851   Reconstruction               0-002-023  03/22/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0240   Reconstruction               0-002-024  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1283   Reconstruction               0-002-025  07/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0556   Reconstruction               0-002-026  12/13/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2400   Reconstruction               0-002-027  08/01/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0950   Reconstruction               0-002-028  01/10/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1043   Reconstruction               0-002-029  03/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0250   Reconstruction               0-002-030  10/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0263FP Reconstruction               0-002-FP1  10/23/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1090SC Visual Structural Inspection 0-002-SC1  04/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Moses Dewitt Elementary:
91-0794   Reconstruction               0-003-004  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1627   Reconstruction               0-003-005  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0691   Reconstruction               0-003-006  03/10/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1480   Reconstruction               0-003-007  05/21/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0118   Reconstruction               0-003-008  08/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0355   Reconstruction               0-003-009  05/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0734   Reconstruction               0-003-010  05/08/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E-005          19,233                  11/05/08   02/19/09    KNAPP ELECTRIC, INC.                
                                                            GC-017         18,653                  06/24/08   10/31/08    BACON & SEILER                      
                                                            GC-018         15,339                  06/24/08   10/31/08    BACON & SEILER                      
                                                            GC-019          4,263                  06/24/08   10/31/08    BACON & SEILER                      
                                                            GC-020          7,442                  06/24/08   10/31/08    BACON & SEILER CONSTRUCTORS         
                                                            GC-021          1,593                  06/24/08   10/27/08    BACON & SEILER CONSTRUCTORS         
                                                            GC-022          5,113                  06/24/08   10/31/08    BACON & SEILER CONSTRUCTORS         
                                                            GC-028          1,409                  08/01/08   01/22/09    BACON &SEILER CONSTRUCTORS,INC      
                                                            GC-029         -1,239                  08/01/08   05/11/09    BACON & SEILER CONSTRUCTORS,INC     
                                                            GC-032          2,094                  10/23/08   11/12/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-039            621                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-045          4,804                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-046          5,305                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-047          4,502                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORSM INC.   
                                                            GC-048          2,985                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-050          1,319                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-053          5,974                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-055          9,319                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-060          5,927                  04/16/10   04/20/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            P-004             918                  10/21/09   11/20/09    TOWN MECHANICAL INC                 
 
10-0986   Reconstruction               0-003-011  05/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R4-001        -18,791                  03/30/12   08/31/12    APPLE ROOFING CORPORATION           
 
11-1159   Reconstruction               0-003-013  07/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002              0                  11/20/14   12/01/14    Bagnall Electric, Inc.              
 
16-1921   Reconstruction               0-003-014  03/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002              0                  02/27/20   07/02/20    PATRICIA ELECTRIC, INC.             
                                                            FAC-002             0                  01/10/20   01/28/20    PATRICIA ELECTRIC, INC.             
                                                            SC-001          9,385                  04/24/19   04/29/19    PAUL F. VITALE,INC.                 
 
20-0852   Reconstruction               0-003-015  03/22/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1284   Reconstruction               0-003-016  07/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1838FC Reconstruction               0-003-017  05/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0264FP Reconstruction               0-003-FP1  10/23/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1091SC Visual Structural Inspection 0-003-SC1  04/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jamesville Elementary School:
91-0795   Reconstruction               0-004-005  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0692   Reconstruction               0-004-006  03/10/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0119   Reconstruction               0-004-007  08/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0356   Reconstruction               0-004-008  05/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0901   Additions and Alterations    0-004-009  06/23/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0430   Reconstruction               0-004-010  01/27/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0735   Reconstruction               0-004-011  05/08/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-011           1,241                  10/21/09   11/20/09    KNAPP ELECTRIC INC                  
 
10-0987   Reconstruction               0-004-012  05/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R5-001        -22,505                  04/15/13   06/25/13    ELMER W DAVIS INC                   
                                                            SC-004        -15,014                  03/08/13   05/17/13    SMITH SITE DEVELOPMENT LLC          
                                                            SC-005           -848                  03/08/13   05/17/13    SMITH SITE DEVELOPMENT LLC          
 
16-1922   Reconstruction               0-004-015  03/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FAC-001             0                  01/10/20   01/28/20    PATRICIA ELECTRIC, INC.             
 
20-0853   Reconstruction               0-004-016  03/22/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1285   Reconstruction               0-004-017  07/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1839FC Reconstruction               0-004-018  05/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0265FP Reconstruction               0-004-FP1  10/23/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1093SC Visual Structural Inspection 0-004-SC1  04/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tecumseh Elementary:
91-0796   Additions and Alterations    0-006-004  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0693   Reconstruction               0-006-006  03/10/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0120   Reconstruction               0-006-007  08/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0357   Reconstruction               0-006-008  05/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0902   Additions and Alterations    0-006-009  06/23/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0431   Reconstruction               0-006-010  01/27/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-12           1,441                  11/28/05   12/09/05    Bouley Associates                   
 
06-0736   Additions and Alterations    0-006-011  05/08/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E-001          -1,150                  03/12/08   03/15/08    Knapp Electric, Inc.                
                                                            E-002          -4,100                  03/12/08   03/15/08    Knapp Electric, Incorporated        
                                                            E-003          -1,560                  04/01/08   08/07/08    KNAPP ELECTRIC, INC.                
                                                            E-004         -17,138                  04/03/08   08/12/08    KNAPP ELECTRIC, INC.                
                                                            E-006             401                  10/21/09   11/20/09    KNAPP ELECTRIC INC                  
                                                            E-007           1,785                  10/21/09   11/20/09    KNAPP ELECTRIC INC                  
                                                            E-008             277                  10/21/09   11/20/09    KNAPP ELECTRIC INC                  
                                                            E-009           6,049                  10/21/09   11/20/09    KNAPP ELECTRIC INC                  
                                                            E-010            -483                  10/21/09   11/20/09    KNAPP ELECTRIC INC                  
                                                            GC-002         60,562                  09/11/07   08/08/08    BECON & SEILER CONSTRUCTORS, INC.   
                                                            GC-003          8,162                  12/06/07   12/27/07    Bacon & Seiler Constructors         
                                                            GC-004           -305                  12/06/07   12/27/07    Bacon & Seiler Constructors         
                                                            GC-005         -1,930                  12/06/07   12/27/07    Bacon & Seiler Constructors         
                                                            GC-006          2,340                  03/12/08   04/18/08    Bacon & Seiler Constructors, Incorpo
                                                            GC-007          1,929                  03/12/08   04/18/08    Bacon & Seiler Constructors, Incorpo
                                                            GC-008          2,028                  03/12/08   04/18/08    Bacon & Seiler Constructors, Incorpo
                                                            GC-009          5,255                  04/01/08   04/21/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-011         59,000                  05/05/08   08/04/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-012         -4,186                  05/05/08   08/04/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-013           -279                  05/05/08   08/04/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-014          3,638                  05/05/08   08/04/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-015          1,091                  05/05/08   08/04/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-016            938                  05/05/08   08/04/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-024           -456                  08/01/08   05/11/09    BACON & SEILER CONSTRUCTORS,INC     
                                                            GC-025            651                  08/01/08   05/11/09    BACON & SEILER CONSTRUCTORS,INC     
                                                            GC-026         -3,441                  08/01/08   05/11/09    BACON & SEILER CONSTRUCTORS, INC    
                                                            GC-027          1,047                  08/01/08   05/11/09    BACON & SEILER CONSTRUCTORS,INC     
                                                            GC-030          4,820                  10/23/08   11/12/08    BACON & SILER CONSTRUCTORS, INC.    
                                                            GC-031          1,069                  10/23/08   11/12/08    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-033         24,164                  04/16/10   04/20/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-034          2,905                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-036        -17,300                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-037            412                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTOR, INC.    
                                                            GC-038            271                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-040            713                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-041            676                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-042            831                  12/15/08   05/13/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-043          1,156                  12/15/08   05/13/09    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-049          3,057                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORSM INC.   
                                                            GC-051          1,071                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-052         -1,400                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-056          1,041                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-057            989                  05/16/10   04/20/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-059           -962                  04/16/10   04/20/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-58           6,004                  04/16/10   04/20/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            H-001            -356                  06/04/09   07/16/09    KING AND KING MECHANICAL INC        
                                                            H-002            -563                  06/04/09   07/16/09    KING AND KING MECHANICAL INC        
                                                            H-003          -1,200                  06/04/09   07/16/09    KING AND KING MECHANICAL INC        
                                                            H-004            -486                  06/04/09   07/16/09    KING AND KING MECHANICAL INC        
                                                            H-005           3,226                  06/04/09   07/16/09    KING AND KING MECHANICAL INC        
                                                            H-006           4,627                  06/04/09   07/16/09    KING AND KING MECHANICAL INC        
                                                            H-007             120                  06/04/09   07/16/09    KING AND KING MECHANICAL INC        
                                                            P-001          -7,058                  01/31/08   08/07/08    BOVIS LEND LEASE LMB, INC.          
                                                            P-002            -108                  04/01/08   08/07/08    TOWN MECHANICAL, INC.               
                                                            P-005          -2,523                  10/21/09   11/20/09    TOWN MECHANICAL INC                 
                                                            P-006            -431                  10/21/09   11/20/09    TOWN MECHANICAL INC                 
                                                            R-001            -906                  10/21/09   11/20/09    SANDS BROTHERS ROOFING COMPANY INC  
 
10-0988   Additions and Alterations    0-006-012  05/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R3-001        -16,587                  08/13/12   11/28/12    EV Roofing and Construction Supply  
 
11-1160   Reconstruction               0-006-014  07/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-001              0                  11/20/14   12/01/14    Bagnall Electric, Inc.              
                                                            GC-001          3,442                  11/20/14   12/01/14    James & Son Construction Co., Inc.  
                                                            MC-002         17,629                  10/17/14   11/05/14    Airtech Heating & A/C Systems, Inc. 
                                                            PC-11               0                  11/20/14   12/01/14    Scharf Plumbing and Heating, Inc.   
 
16-1923   Reconstruction               0-006-015  03/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FAC-003             0                  01/10/20   01/28/20    PATRICIA ELECTRIC, INC.             
 
20-1286   Reconstruction               0-006-016  07/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1840FC Reconstruction               0-006-017  05/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0266FP Reconstruction               0-006-FP1  10/01/02  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1092SC Visual Structural Inspection 0-006-SC1  04/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          JD Middle School:
90-1628   Reconstruction               0-007-004  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0637   Reconstruction               0-007-005  04/05/93  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0797   Reconstruction               0-007-006  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0121   Reconstruction               0-007-008  08/23/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0358   Reconstruction               0-007-009  05/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0903   Additions and Alterations    0-007-010  06/23/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-S12        16,735                  08/13/04   09/23/04    Robert Law                          
                                                            002-S12       -10,438                  09/29/05   10/14/05    robert Law                          
                                                            P-11           22,655                  02/17/04   04/13/04    Brosh Mechanical                    
 
04-0432   Reconstruction               0-007-011  01/27/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-GC11       10,605                  08/17/05   08/25/05    Bouley Associates                   
                                                            002GC-12       13,334                  08/17/05   08/25/05    Bouley Associates                   
                                                            003GC-12       10,030                  08/17/05   08/25/05    Bouley Associates                   
                                                            P-12          -10,404                  11/28/05   12/09/05    Oswego Mechanical                   
 
06-0737   Reconstruction               0-007-012  05/08/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-012           1,241                  10/21/09   11/20/09    KNAPP ELECTRIC INC                  
                                                            GC-044         33,199                  05/03/10   05/19/10    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-054          5,983                  05/03/10   05/19/10    BACON &  SEILER CONSTRUCTORS, INC.  
 
10-0989   Reconstruction               0-007-013  05/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1161   Reconstruction               0-007-015  07/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003            817                  11/20/14   12/01/14    Bagnall Electric, Inc.              
                                                            MC-001            150                  10/17/14   11/05/14    Airtech Heating & A/C Systems, Inc. 
                                                            PC-002          5,886                  11/20/14   12/01/14    Scharf Plumbing and Heating, Inc.   
                                                            PC-002          5,886                  11/20/14     /  /      Scharf Plumbing and Heating, Inc.   
                                                            R2-001        -10,874                  02/27/13   06/13/14    APPLE ROOFING CORP                  
 
16-1924   Reconstruction               0-007-016  03/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003              0                  02/27/20   07/02/20    PATRICIA ELECTRIC, INC.             
                                                            FAC-004             0                  01/10/20   01/28/20    PATRICIA ELECTRIC, INC.             
                                                            GC-002        252,000                  04/24/19   04/29/19    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-005          1,426                  01/13/20   02/05/20    J. PRIORE CONSTRUCTION CO.,INC.     
 
20-0854   Reconstruction               0-007-017  03/22/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0901   Reconstruction               0-007-018  03/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1287   Reconstruction               0-007-019  07/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1094SC Visual Structural Inspection 0-007-SC1  04/09/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage (upper):
00-0359   Reconstruction               4-015-003  05/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0738   Reconstruction               4-015-004  05/08/07  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0990   Reconstruction               4-015-005  05/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1925   Reconstruction               4-015-008  03/22/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1288   Reconstruction               4-015-009  07/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
90-1629   Alterations                  5-014-001  06/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0798   Reconstruction               5-014-003  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0694   Reconstruction               5-014-004  03/10/95  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0966   Reconstruction               5-014-005  04/18/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            Demo-001       -2,582                  02/18/14   03/14/14    Parsons-McKenna Construction Co.    
                                                            EC-001              0                  02/18/14   03/14/14    Panko Electrical & Maint., Inc.     
                                                            EC-002          2,751                  02/18/14   03/14/14    Panko Electrical & Maint., Inc.     
                                                            EC-003         12,459                  02/18/14   03/14/14    Panko Electrical & Maint., Inc.     
                                                            EC-004              0                  08/13/14   09/26/14    Panko Electrical & Maint., Inc.     
                                                            EC-005              0                  08/13/14   09/26/14    Panko electrical & Maint., Inc.     
                                                            EC-006          5,035                  08/13/14   09/26/14    Panko Electrical & Maint., Inc.     
                                                            EC-007            560                  07/25/14   10/29/14    Panko Electrical & Maint., Inc.     
                                                            EC-008          1,857                  08/13/14   09/26/14    Panko Electrical & Maint., Inc.     
                                                            GC-002              0                  04/10/14   05/05/14    James and Son Construction Co., Inc.
                                                            GC-01           3,154                  04/10/14   05/05/14    James & Son Construction Co., Inc.  
                                                            MC-001              0                  05/12/14   05/21/14    HMI Mechanical Systems, Inc.        
                                                            MC-003          2,719                  12/17/14   12/22/14    HMI Mechanical Systems, Inc.        
                                                            PC-001              0                  07/25/14   10/29/14    Oswego Mechanical, Inc.             
                                                            PC-002          3,581                  07/25/14   10/29/14    Oswego Mechanical, Inc.             
                                                            PC-003            354                  07/25/14   10/29/14    Oswego Mechanical, Inc.             
                                                            PC-004            635                  07/25/14   10/29/14    Oswego Mechanical, Inc.             
 
96-1274   Reconstruction               5-014-006  04/25/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0360   Reconstruction               5-014-007  05/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0739   Reconstruction               5-014-008  05/08/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-035          2,155                  12/15/08   02/26/09    BACON & SEILER CONSTRUCTORS, INC.   
 
10-0991   Reconstruction               5-014-009  05/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            R1-003         -2,730                  05/30/14   06/30/14    Elmer W. Davis, Inc.                
                                                            SC-003         12,792                  03/08/13   05/17/13    SMITH SITE DEVELOPMENT LLC          
                                                            SC-007           -831                  03/08/13   05/17/13    SMITH SITE DEVELOPMENT LLC          
 
16-1926   Reconstruction               5-014-011  03/22/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001              0                  02/27/20   07/02/20    PATRICIA ELECTRIC, INC.             
                                                            SC-003          1,056                  03/27/19   04/01/19    PAUL F. VITALE, INC.                
 
20-0855   Reconstruction               5-014-012  03/22/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1289   Reconstruction               5-014-013  07/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
91-0799   Additions and Alterations    7-009-002  04/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession/Restrooms-HS:
95-1156   New Construction             7-024-002  05/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School Press Box:
10-1321   New Construction             7-027-001  05/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-001         12,566                  03/08/13   05/17/13    SMITH SITE DEVELOPMENT LLC          
 

          District Wide:
22-0045   Reconstruction               7-999-001  11/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0858FA Reconstruction               7-999-002  11/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE

JORDAN ELBRIDGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-05-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Ramsdell Middle school:
94-0280   Additions and Alterations    0-001-004  12/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1233   Reconstruction               0-001-006  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1                 0                  10/18/02   10/28/02    Knapp Elec.                         
 
11-1140   Reconstruction               0-001-007  06/21/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           -10,789                  05/23/13   07/08/13    Ridley Electric Co. Inc.            
 
10-0468   Reconstruction               0-001-008  06/08/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E - 10          1,068                  10/15/12   07/15/13    Edgeline Electric Corp.             
                                                            E - 17            729                  10/15/12   07/15/13    Edgeline Electric Corp.             
                                                            E - 3             938                  10/15/12   07/15/13    Edgeline Electric Corp.             
                                                            E - 5          -2,720                  10/15/12   07/16/13    Edgeline Electric Corp.             
                                                            E - 7             860                  10/15/12   07/15/13    Edgeline Electric Corp.             
                                                            E-1               757                  02/18/14   03/20/14    Ridley Electric Co. Inc.            
                                                            E-11           11,410                  10/15/12     /  /      Edgeline Electric Corp.             
                                                            E-18               -1                  10/15/12   07/16/13    EDGELINE ELECTRIC CORP              
                                                            GC-11          10,688                  05/23/13   07/03/13    MCK Building Associates             
                                                            GC-13          51,119                  05/23/13   07/03/13    MCK Building Associates             
                                                            GC-14         -16,603                  05/23/13   07/03/13    MCK Building Associates             
                                                            GC-15         -17,965                  05/23/13   07/10/14    MCK Building Associates             
                                                            GC-19           5,895                  05/23/13   07/03/13    MCK Building Associates             
                                                            GC-22         -24,346                  05/23/13   07/11/13    MCK Building Associates             
                                                            GC-24           9,415                  05/23/13   07/11/13    MCK Building Associates             
                                                            GC-25             498                  05/23/13   07/11/13    MCK Building Associates             
                                                            GC-26           3,115                  05/26/13   07/11/13    MCK Building Associates             
                                                            GC-5            8,904                  05/06/13   07/03/13    MCK Building Associates             
                                                            GC-6          -69,420                  05/06/13   07/03/13    MCK Building Associates             
                                                            GC-8           53,083                  05/23/13   07/03/13    MCK Building Associates             
                                                            H-10            9,994                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            H-11           22,014                  12/05/12     /  /      KING & KING MECHANICAL INC          
                                                            H-12            4,431                  05/06/13   12/18/13    King & King Mechanical Inc.         
                                                            H-2             3,987                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            H-3             9,030                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            H-6            18,800                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            H-7             4,759                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            P - 2           4,525                  10/15/12   08/12/13    J & A Mechancial Inc.               
                                                            P - 3             787                  10/15/12   07/15/13    J & A Mechancial Contractors Inc.   
                                                            S-6            10,605                  10/22/12   02/25/13    Paul F. Vitale, Inc.                
                                                            S-7             2,019                  01/30/13   05/09/13    PAUL F VITALE INC                   
 
08-1582   Reconstruction               0-001-009  05/19/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0909   Reconstruction               0-001-010  06/21/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0564   Reconstruction               0-001-011  09/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0725   Reconstruction               0-001-012  03/20/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            1,435                  09/29/14   10/08/14    Diamond & Theil Construction Co.,   
 
16-0104   Reconstruction               0-001-013  02/14/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03             840                  10/27/17   11/08/17    Ridley Electric Co., Inc.           
                                                            GC-03          10,078                  01/22/18   02/09/18    Diamond and Thiel Construction Co., 
                                                            HVAC-04         2,573                  01/05/18   01/31/18    J & A MECHANICAL                    
                                                            HVAC-05        -9,000                  01/22/18   03/08/18    J&A Mechanical Contractors Inc.     
                                                            RC-01        -141,000                  10/02/17   10/13/17    Dewald Roofing Co., Inc.            
                                                            RC-02           9,522                  10/02/17   10/13/17    Dewald Roofing Co., Inc.            
                                                            RC-04             729                  11/06/17   11/28/17    Dewald Roofing Co., Inc.            
                                                            RC-06           1,070                  12/04/17   02/14/18    Dewald Roofing Co., Inc.            
                                                            RC-08             950                  01/22/18   02/09/18    Dewald Roofing Co., Inc.            
 
15-1393   Reconstruction               0-001-014  06/21/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-1             2,284                  02/15/17   02/16/17    HMI Mechanical Systems              
                                                            H-2             1,867                  12/28/17   12/29/17    HMI Mechanical System               
 
17-1580   Reconstruction               0-001-015  10/18/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1273   Reconstruction               0-001-016  05/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         15,149                  05/10/19   05/17/19    BELLOWS CONSTRUCTION SPECIALTIES, LL
                                                            GC-003          8,967                  05/10/19   05/17/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-004         18,618                  05/10/19   05/17/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-005         -5,041                  05/10/19   05/17/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
 
19-0436   Reconstruction               0-001-017  01/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           4,935                  07/24/20   10/28/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-02           2,851                  07/24/20   10/28/20    C&S TECHNICAL RESOURCES, INC.       
 
18-2174   Reconstruction               0-001-018  07/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1740   Reconstruction               0-001-019  08/14/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1780   Reconstruction               0-001-020  06/22/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1957   Reconstruction               0-001-022  07/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elbridge Elementary:
90-1335   Additions and Alterations    0-004-001  05/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1162   Reconstruction               0-004-004  04/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1245   Reconstruction               0-004-005  04/30/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1339   Reconstruction               0-004-006  05/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1234   Reconstruction               0-004-008  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            5,256                  09/13/02   10/28/02    James and Son Const.                
                                                            GC-2          -10,835                  06/26/03     /  /      James and Son Const.                
 
06-1010   Reconstruction               0-004-009  03/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,800                  12/10/07   01/07/08    J&B Installations Inc.              
                                                            4               6,688                  12/07/08   01/07/08    J&B Installations,Inc.              
 
10-0469   Reconstruction               0-004-010  06/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            42050106            0                    /  /       /  /                                          
                                                            E - 10          1,067                  10/15/13     /  /      Edgeline Electric Corp.             
                                                            E - 12            761                  10/15/12   07/15/13    Edgeline Electric Corp.             
                                                            E - 15         13,818                  10/15/12   08/12/13    Edgeline Electric Corp.             
                                                            E-13            1,067                  10/15/12   07/16/13    EDGELINE ELECTRIC CORP              
                                                            E-4             3,110                  10/15/13     /  /      Edgeline Electric Corp.             
                                                            GC-1            4,768                  02/18/14   03/20/14    MCK Building Associates             
                                                            GC-10             499                  05/23/13   07/03/13    MCK Building Associates             
                                                            GC-20          49,785                  05/23/13   07/03/13    MCK Building Associates             
                                                            GC-23          13,367                  05/23/13   07/11/13    MCK Building Associates             
                                                            H-13            5,741                  05/06/13   12/18/13    King & King Mechanical Inc.         
                                                            H-8            10,559                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            H-9             4,104                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            P - 1           1,014                  10/15/12   07/16/13    J & A Mechanical Contractors Inc.   
                                                            P-2               356                  02/18/14   03/20/14    J & A Mechanical Contractors, Inc.  
                                                            P-3               695                  02/18/14   03/20/14    J & A Mechanical Contractors, Inc.  
                                                            S - 1          16,073                  10/22/12   02/25/13    Paul F. Vitale, Inc.                
                                                            S - 5           3,627                  10/22/12   02/25/13    Paul F. Vitale, Inc.                
                                                            W-3            -2,492                  05/06/13   07/03/13    Window Specialist Inc.              
 
08-1583   Reconstruction               0-004-011  05/19/09  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1141   Reconstruction               0-004-012  06/21/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0910   Reconstruction               0-004-013  06/21/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0565   Reconstruction               0-004-014  09/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0726   Reconstruction               0-004-015  03/20/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0105   Reconstruction               0-004-016  02/14/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC06            1,404                  06/11/18   06/29/18    RIDLEY ELECTRIC CO INC              
                                                            EC07           19,934                  06/11/18   06/29/18    RIDLEY ELECTRIC CO INC              
                                                            EC08           19,166                  06/11/18   06/29/18    RIDLEY ELECTRIC CO INC              
                                                            EC09           19,820                  06/11/18   06/29/18    RIDLEY ELECTRIC CO INC              
                                                            GC-01           2,100                  01/05/18   01/29/18    DIAMOND AND THIEL CONSTRUCTION      
                                                            HVAC-03           721                  01/05/18   01/31/18    J & A MECHANICAL                    
 
17-1581   Reconstruction               0-004-018  02/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1274   Reconstruction               0-004-019  05/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-01            6,340                  10/09/19   10/15/19    ANTHONY DEMARCO AND SONS NURSERY,LLC
 
19-0437   Reconstruction               0-004-020  01/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01            -792                  08/14/20   09/25/20    KNAPP ELECTRIC, INC.                
                                                            GC-03           8,779                  08/14/20   09/29/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-04          -2,552                  10/26/20   02/23/21    C&S TECHNICAL RESOURCES, INC.       
                                                            PC-01          -2,372                  10/26/20   12/31/20    OSWEGO MECHANICAL, INC.             
 
22-1343   Reconstruction               0-004-022  10/19/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1484FP Reconstruction               0-004-FP1  04/10/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ramsdell Middle:
00-1235   Reconstruction               0-008-003  10/01/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1485FP Reconstruction               0-008-FP1  04/10/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
98-0829   Reconstruction               0-009-005  05/03/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BFY-001         4,757                  06/04/03   06/05/03    BF Yenny Const.                     
                                                            BFY-009        -3,629                  06/04/03   06/05/03    BF Yenny                            
                                                            BFY-010        -2,079                  06/04/03   06/05/03    BF Yenny                            
                                                            BFY-011         2,742                  06/04/03   06/05/03    BF Yenny                            
                                                            BFY-011         3,921                  05/03/00   12/02/03    BF Yenny                            
                                                            BFY-012         1,118                  06/04/03   06/05/03    BF Yenny                            
                                                            JVS-005             0                  01/29/01   01/14/03    JV Spano                            
                                                            JVS-006             0                  01/29/01   01/30/02    JV Spano                            
                                                            LHW-001         4,050                  01/29/01   01/30/02    L&H Window Erectors                 
                                                            RGB-004        -2,183                  06/04/03   06/05/03    Burns Elec.                         
                                                            RGB-006         3,404                  06/05/03   06/05/03    Burns Elec.                         
                                                            TGNY-003        6,016                  01/29/01   01/30/02    Target Group                        
 
99-0696   Reconstruction               0-009-006  04/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-001         25,874                  12/28/01   03/26/02    Massa Const.                        
                                                            MC-011              0                  10/19/01   05/22/02    Massa Const.                        
                                                            MC-013         -6,695                  12/28/01   03/26/02    Massa Const.                        
                                                            SI-003        -12,358                  10/07/02   11/06/02    Santaro Industries                  
 
04-0317   Reconstruction               0-009-009  12/07/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-1            -6,000                  08/30/05   09/01/05    Green Plumbing Inc                  
 
06-1011   Reconstruction               0-009-010  03/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              11,335                  12/10/07   01/07/08    J&B Installations Inc.              
                                                            3              29,234                  12/07/07   01/07/08    J&B Installations,Inc.              
 
09-0128   Reconstruction               0-009-011  08/19/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              54,263                  04/23/10   08/13/10    Blue Heron Construction             
 
09-0521   Additions and Alterations    0-009-012  03/29/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E - 1          11,631                  10/15/12   08/09/13    Edgeline Electric Corp.             
                                                            E - 14         11,595                  10/15/12   08/09/13    Edgeline Electric Corp.             
                                                            E - 16         13,510                  10/15/12   08/09/13    Edgeline Electric Corp.             
                                                            E - 2          15,820                  10/15/12   08/09/13    Edgeline Electric Corp.             
                                                            E - 6           1,408                  10/15/12   07/16/13    Edgeline Electric Corp.             
                                                            E - 8             897                  10/15/12   07/03/13    Edgeline Electric Corp.             
                                                            E - 9           3,778                  10/15/12   08/09/13    Edgeline Electric Corp.             
                                                            E-10            9,549                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-11           11,687                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-13           10,958                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-14           -2,040                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-15              259                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-16           15,663                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-17           10,996                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-2             7,495                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-21           17,962                  01/27/14   07/16/14    Knapp Electric                      
                                                            E-22            4,777                  01/27/14   07/16/14    Knapp Electric                      
                                                            E-23           13,741                  01/27/14   07/16/14    Knapp Electric                      
                                                            E-24            5,893                  01/27/14   07/16/14    Knapp Electric                      
                                                            E-25            7,430                  01/27/14   07/16/14    Knapp Electric                      
                                                            E-26            3,402                  01/27/14   07/16/14    Knapp Electric                      
                                                            E-3            42,902                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-4            13,556                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-5            47,250                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-6              -108                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-8            13,495                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-9             1,260                  01/09/14   02/07/14    Knapp Electric                      
                                                            GC HS-1        26,236                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-10        9,848                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-11        7,908                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-12       19,567                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-13       67,935                  09/30/13   10/24/13    EL Ames DBA RJ Orlieb Construction  
                                                            GC HS-14        4,217                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-15        4,055                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-16       11,726                  09/30/13   10/24/13    EL AMes DBA RJ Ortlieb Construction 
                                                            GC HS-17        3,276                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-17       14,362                  09/30/13   10/24/13    EL Ames DBA RJ Ortlieb Construction 
                                                            GC HS-19        3,470                  09/30/13   10/24/13    EL Ames DBA RJ Ortlieb Construction 
                                                            GC HS-2        17,047                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-20       11,288                  12/12/13   06/27/14    EL Ames DBA RJ Ortlieb Construction 
                                                            GC HS-21       15,880                  12/12/13   06/27/14    EL Ames DBA RJ Ortlieb Construction 
                                                            GC HS-3        14,497                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-4        13,890                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-5        17,723                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-6        18,879                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-7        23,238                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-8        15,630                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC HS-9        31,732                  11/04/11   01/06/12    RJ ORTLIEB CONSTRUCTION             
                                                            GC-1            6,925                  05/06/13   06/28/13    MCK Building Associates             
                                                            GC-12           2,383                  05/23/13   06/28/13    MCK Building Asssociates            
                                                            GC-16          19,805                  05/23/13   06/28/13    MCK Building Associates             
                                                            GC-17          24,367                  05/23/13   06/28/13    MCK Building Associates             
                                                            GC-18           6,353                  05/23/13   06/28/13    MCK Building Associates             
                                                            GC-2           18,862                  05/06/13   06/28/13    MCK Building Associates             
                                                            GC-2              518                  02/18/14   03/14/14    MCK Building Associates             
                                                            GC-21          26,933                  05/23/13   06/28/13    MCK Building Associates             
                                                            GC-3           14,705                  05/06/13   06/28/13    MCK Building Associates             
                                                            GC-3              474                  02/18/14   03/14/14    MCK Building Associates             
                                                            GC-7            4,585                  05/06/13   11/22/13    MCK Building Associates             
                                                            GC-9           11,399                  05/23/13   06/28/13    MCK Building Associates             
                                                            H-1             5,368                  10/19/11   05/14/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            H-1             3,956                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            H-1             3,378                  02/18/14   03/14/14    DW & Crew Mechanicals Inc.          
                                                            H-2             3,013                  10/19/11   05/14/12    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            H-4             1,980                  12/05/12   07/16/13    KING & KING MECHANICAL INC          
                                                            H-4            17,765                  09/13/13   02/03/14    Airtech Heating & A/C Systems       
                                                            H-5             4,333                  12/05/12   08/16/13    KING & KING MECHANICAL INC          
                                                            H-5             8,715                  09/13/13   02/03/14    Airtech Heating & A/C Systems       
                                                            HS-KE-1         7,257                  10/24/11   10/24/12    MAIN FOOD GENERAL SUPPLY COMPANY    
                                                            HS-KE-2         1,800                  10/24/11     /  /      MAIN FOOD GENERAL SUPPLY COMPANY    
                                                            P-1             3,996                  02/18/14   03/14/14    J & A Mechanical Contractors, Inc.  
                                                            P-3             5,148                  09/09/13   02/03/14    Brosh Mechanical                    
                                                            P-4             2,151                  09/09/13   02/03/14    Brosh Mechanical                    
                                                            P-5            -8,151                  09/13/13   02/03/14    Brosh Mechanical                    
                                                            S - 2           4,600                  10/22/12   02/15/13    Paul F. Vitale, Inc.                
                                                            S - 3          10,662                  10/22/12   02/15/13    Paul F. Vitale, Inc.                
                                                            S - 4           3,236                  10/22/12   02/15/13    Paul F. Vitale, Inc.                
                                                            S-10           -6,470                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            S-11            6,071                  09/30/13   10/24/13    Pail F. Vitale Inc.                 
                                                            S-12           -7,635                  09/30/13   10/24/13    Paul F. Vitale Inc.                 
                                                            S-13            1,628                  09/30/13   10/24/13    Paul F. Vitale Inc.                 
                                                            S-14           61,740                  09/30/13   10/24/13    Paul F. Vitale Inc.                 
                                                            S-2            11,700                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            S-3            84,960                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            S-5            10,560                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            S-6A           12,894                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            S-6B           12,621                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            S-7            12,066                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            S-8             2,392                  09/11/13   09/13/13    Paul F. Vitale Inc.                 
                                                            S-9             8,617                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            T-1             2,891                  04/22/13     /  /      Syracuse Scenery & Stage Lighting   
                                                            T-2             5,708                  04/22/13   12/18/13    Syracuse Scenery & Stage Lighting   
                                                            W-1            -1,050                  01/30/13   04/15/13    WINDOW SPECIALIST INC               
                                                            W-2            -4,608                  01/30/13   04/15/13    WINDOW SPECIALIST INC               
                                                            h-3            17,242                  09/13/13   02/03/14    Airtech Heating & A/C Systems       
 
11-1142   Reconstruction               0-009-016  06/21/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0120   Reconstruction               0-009-017  01/11/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0285   Reconstruction               0-009-019  03/10/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0566   Reconstruction               0-009-020  09/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0727   Reconstruction               0-009-021  03/20/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0438   Reconstruction               0-009-022  04/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0106   Reconstruction               0-009-023  02/14/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          13,193                  10/02/17   10/13/17    Ridley Electric Co., Inc.           
                                                            EC-02           7,618                  10/02/17   10/13/17    Ridley Electric Co., Inc.           
                                                            EC-04           6,189                  11/20/17   12/15/17    Ridley Electric Co., Inc.           
                                                            EC-05             511                  01/05/18   01/31/18    RIDLEY ELECTRIC                     
                                                            GC-04           5,727                  01/22/18   02/09/18    Diamond and Thiel Construction Co., 
                                                            GC-05             397                  01/22/18   02/09/18    Diamond and Thiel Construction Co., 
                                                            HVAC-01        45,756                  12/04/17   02/14/18    J & A Mechanical Contractors Inc.   
                                                            HVAC-02         8,998                  01/05/18   01/31/18    J & A MECHANICAL                    
                                                            PC-01          12,413                  01/05/18   01/31/18    J&A Mechanical Contractors Inc.     
                                                            RC-03          18,190                  11/06/17   02/13/18    Dewald Roofing Co., Inc.            
                                                            RC-05           3,016                  11/06/17   11/28/17    Dewald Roofing Co., Inc.            
                                                            RC-07           4,334                  12/04/17   02/14/18    Dewald Roofing Co., Inc.            
                                                            SC-001          6,447                  04/06/18   04/18/18    CW Site Development                 
                                                            SC-002          4,598                  04/06/18   04/18/18    CW Site Development                 
 
17-1582   Reconstruction               0-009-024  02/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1091   Reconstruction               0-009-025  05/07/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1275   Reconstruction               0-009-026  05/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002         -1,280                  05/10/19   05/17/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
 
18-1089   Reconstruction               0-009-027  03/11/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          7,441                  07/05/19   07/15/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
 
19-0438   Reconstruction               0-009-028  01/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-05          12,891                  10/26/20   02/23/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-06          16,770                  10/26/20   02/23/21    C&S TECHNICAL RESOURCES, INC.       
 
23-0001   Reconstruction               0-009-030  09/15/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1486FP Reconstruction               0-009-FP1  04/10/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mfd. Bldg. #1 @ HS:
99-1260   New Construction             0-013-001  08/15/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Barn:
09-0878   New Construction             2-005-001  03/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building:
09-0522   New Construction             2-019-001  03/29/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E-20            6,300                  01/09/14   02/07/14    Knapp Electric                      
                                                            S-1            43,642                  09/11/13   09/13/13    Pail F. Vitale Inc.                 
 

          Bus Garage:
94-0281   Reconstruction               5-002-002  12/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1236   Additions and Alterations    5-002-003  10/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2              -730                  02/19/03   03/13/03    Knapp Electric                      
                                                            E-3               450                  07/16/03   07/25/03    Knapp Electric                      
                                                            GC-2          -10,835                  06/26/03   07/02/03    James and Son Const.                
                                                            HVAC-1            949                  03/06/03   03/13/03    Edward Galvin                       
                                                            P-1              -620                  06/26/03   07/02/03    Siracusa Mechanical                 
 
11-1143   Reconstruction               5-002-005  06/21/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1103   Additions and Alterations    5-002-006  05/29/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-1             7,091                  06/02/14   06/27/14    Ridley Electric Co., Inc.           
                                                            E-2             2,971                  06/02/14   06/27/14    Ridley Electric Co., Inc.           
                                                            E-3             4,357                  06/02/14   06/27/14    Ridley Electric, Inc.               
                                                            GC-1            1,259                  06/02/14   06/27/14    Diamond & Thiel Construction Co.,   
                                                            GC-2            3,404                  06/02/14   06/27/14    Diamond & Thiel Construction Co.    
                                                            GC-3           10,526                  06/02/14   06/27/14    Diamond & Thiel Construction Co.    
                                                            GC-4            1,316                  06/02/14   06/27/14    Diamond & Thiel Construction Co.    
                                                            GC-5            7,948                  06/02/14   06/27/14    Diamond & Thiel Construction Co. Dia
                                                            GC-6           10,000                  06/02/14   06/27/14    Diamond & Thiel Construction Co.    
                                                            GC-7            3,000                  06/04/14   06/27/14    Diamond & Thiel Construction Co.,   
                                                            GC-8            4,139                  08/20/14   10/09/14    Diamond & Thiel Construction Co. Inc
                                                            H-1             2,981                  04/23/14   05/02/14    Airside Technology Corp.            
                                                            H-2             1,016                  04/23/14   05/02/14    Airside Technology Corp.            
                                                            H-3             2,011                  04/23/14   05/02/14    Airside Technology, Corp.           
                                                            P-1             2,698                  07/21/14   08/15/14    Oswego Mechanical, Inc.             
                                                            P-2             1,315                  07/21/14   08/15/14    Oswego Mechanical, Inc.             
                                                            P-3             7,426                  07/21/14   08/15/14    Oswego Mechanical, Inc.             
                                                            P-4            17,900                  07/21/14   08/15/14    Oswego Mechanical, Inc.             
                                                            P-5               809                  07/21/14   08/15/14    Oswego Mechanical, Inc.             
 
12-0911   Reconstruction               5-002-007  06/19/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0567   Reconstruction               5-002-008  09/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0107   Reconstruction               5-002-009  02/14/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            F-01           -3,738                  11/06/17   11/28/17    LaValley Brothers Construction      
                                                            GC-02          -2,123                  01/05/18   01/26/18    DIAMOND AND THIEL CONSTRUCTION CO.  
 

          Field House:
09-0879   New Construction             7-006-001  03/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
09-0880   New Construction             7-007-002  03/08/10  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box:
00-1771   New Construction             7-015-001  11/27/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box @ High School:
09-0743   New Construction             7-017-001  03/29/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-19            8,715                  01/09/14   02/07/14    Knapp Electric                      
 

          Field House/Concession Building:
09-0523   New Construction             7-018-001  03/29/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-1             1,390                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-18            6,300                  01/09/14   02/07/14    Knapp Electric                      
                                                            E-7               589                  01/09/14   02/07/14    Knapp Electric                      
                                                            E27            -1,659                  01/27/14   07/17/14    KNAPP ELECTRIC                      
                                                            FH-H-1          4,200                  10/24/11   05/14/12    LECLAIRE-FLEMING MECHANICAL CONT    
                                                            FH-H-2          5,481                  09/10/13   02/03/14    LeClaire-Fleming Mechanical         
                                                            FH-P-1          3,030                  09/10/13   09/19/13    LeClaire-Fleming Mechanical         
                                                            GC FH-1        29,600                  10/24/11   12/23/11    JAMES & SON CONSTRUCTION CO INC     
                                                            GC FH-2        13,974                  10/24/11   12/23/11    JAMES & SON CONSTRUCTION CO INC     
                                                            GC FH-3         2,845                  10/24/11   12/23/11    JAMES & SON CONSTRUCTION CO INC     
                                                            GC FH-4          -496                  10/24/11   12/23/11    JAMES & SON CONSTRUCTION CO INC     
                                                            GC FH-5          -781                  10/24/11   12/23/11    JAMES & SON CONSTRUCTION CO INC     
                                                            GC FH-6        10,321                  09/10/13   09/13/13    James & Son Construction Co Inc.    
                                                            GC-4            2,069                  05/06/13   06/28/13    MCK Building Associates             
                                                            P-1            11,526                  10/19/11   10/24/12    BROSH MECHANICAL                    
                                                            P-2             1,883                  10/19/11   05/14/12    BROSH MECHANICAL                    
                                                            S-4            16,096                  10/24/11   12/23/11    PAUL F VITALE INC                   
                                                            e-12              971                  01/09/14   02/07/14    Knapp Electric                      
 
11-1144   Reconstruction               7-018-002  06/21/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
18-0479   Reconstruction               7-999-001  10/29/18  NO CHANGE ORDERS ON ELECTRONIC FILE

FABIUS-POMPEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-06-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Fabius Elementary:
93-0548   Additions and Alterations    0-001-003  02/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0063   Reconstruction               0-001-004  11/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1           -1,000                  06/28/02   06/28/02    Avala Contracting                   
                                                            E-3            15,060                  06/28/02   06/28/02    Bagnall Elec.                       
                                                            E-4             7,380                  06/28/02   06/28/02    Bagnall Elec.                       
                                                            E-5            10,214                  06/28/02   06/28/02    Bagnall Elec.                       
                                                            E-6            16,786                  06/28/02   06/28/02    Bagnall Elec.                       
                                                            E-8            13,668                  06/28/02   06/28/02    Bagnall Elec.                       
                                                            GC-5           18,427                  06/28/02   06/28/02    Diamond & Thiel Const.              
                                                            GC-6           14,286                  06/28/02   06/28/02    Diamond & Thiel Const.              
                                                            GC-7           14,525                  06/28/02   07/12/02    Diamond & Thiel Const.              
                                                            HV-1            1,009                  06/28/02   06/28/02    Wadsworth Mech.                     
                                                            HV-2           31,459                  06/28/02   07/12/02    Wadsworth Mech.                     
                                                            P-2             2,405                  06/28/02   06/28/02    Wadsworth Mech.                     
                                                            R-3             9,398                  06/28/02   06/28/02    Diamond Roofing                     
                                                            SW-1              603                  06/28/02   08/06/02    Lan-Co Site Development             
                                                            SW5             7,063                  06/17/02   07/10/02    Lan-Co Site Development             
 
00-0986   Additions and Alterations    0-001-005  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,880                  05/20/02   05/22/02    Bagnall Elec.                       
                                                            1              22,611                  07/12/02   03/06/09    Bellucci Ent.                       
                                                            1               3,651                  07/26/02   10/28/02    Airtech Heating                     
                                                            10             36,990                  03/31/05     /  /      Bagnall electric                    
                                                            11              8,042                  03/10/05   01/03/06    Bellucci Enterprises inc            
                                                            12             42,634          35,581  03/31/05   06/27/05    Bette Cring                         
                                                            13             32,977                  03/31/05   03/06/09    Bagnall Electric                    
                                                            15             50,048                  03/10/05   03/31/05    Bette Cring                         
                                                            16             18,429                  03/31/05   04/26/05    Bette Cring                         
                                                            16             18,260                  03/31/05     /  /      Bagnall Electric                    
                                                            2               7,404                  07/12/02   01/07/03    Airtech Heating                     
                                                            2 rev           7,715                  05/03/02   05/13/02    Bagnall Elec.                       
                                                            20             24,455                  03/10/05   03/31/05    Bette Cring                         
                                                            21              7,467                  03/31/05   01/04/06    Bagnall Electric Inc                
                                                            3              15,651                  05/03/02   05/13/02    Bette & Cring                       
                                                            3               8,114                  05/20/02   05/22/02    Bagnall Elec.                       
                                                            4              32,114                  07/12/02     /  /      Bagnall Elec.                       
                                                            5               6,665                  03/31/05   01/04/06    Bellucci Enterprises                
                                                            7              35,581                  07/29/02   10/25/02    Bette & Cring                       
                                                            8              42,450                  08/07/02   10/28/02    Bette & Cring                       
                                                            8                 450                  03/31/05   01/04/06    Bellucci Enterprises                
                                                            9              31,841                  08/19/02   10/28/02    Bette & Cring                       
                                                            SLCR-1         12,415                  07/12/02   07/15/02    Syracuse Scenery and Stage Lighting 
 
06-0224   Reconstruction               0-001-006  10/30/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1333   Reconstruction               0-001-007  09/17/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           -13,526                  05/18/12   11/16/12    J & E ELECTRIC INC.                 
                                                            GC-3           -3,144                  12/20/12   03/19/13    J. PRIORE CONSTRUCTION CO INC       
                                                            GC-4           17,859                  12/20/12   03/19/13    J. PRIORE CONSTRUCTION CO INC       
                                                            GC-5              560                  01/28/13   05/09/13    J. PRIORE CONSTRUCTION CO INC       
                                                            P-2             4,907                  05/18/12   07/09/19    DW & CREW MECHANICALS INC           
 
13-0392   Reconstruction               0-001-008  09/30/13  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0153   Reconstruction               0-001-010  05/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           1,443                  12/29/20   03/03/21    RIDLEY ELECTRIC CO.,INC.            
                                                            EC-02              85                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-03           3,962                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-08           1,327                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-09           1,329                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-11             663                  10/17/19   10/21/19    DIEKOW ELECTRIC                     
                                                            EC-14          -1,738                  01/30/20   02/27/20    DIEKOW ELECTRIC                     
                                                            EC-15             449                  07/09/20   08/17/20    DIEKOW ELECTRIC                     
                                                            FS-01          -8,646                  10/09/19   10/18/19    MAIN FORD GENERAL SUPPLY            
                                                            FS-02         -38,545                  10/09/19   10/18/19    MAIN FORD GENERAL SUPPLY            
                                                            FS-03           4,529                  10/09/19   10/18/19    MAIN FORD GENERAL SUPPLY            
                                                            GC-01           2,026                  10/08/19   10/15/19    MCK BUILDING ASSOCIATES             
                                                            GC-01           4,944                  09/16/20   11/13/20    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-02          14,108                  10/09/19   10/15/19    MCK BUILDING ASSOCIATES             
                                                            GC-03             437                  11/23/20   02/22/21    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-04          -6,266                  12/23/19   01/06/20    MCK BUILDING ASSOCIATES             
                                                            GC-07          -5,599                  08/24/20   11/05/20    MCK BUILDING ASSOCIATES             
                                                            GC-08          -7,250                  10/13/20   02/04/21    MCK BUILDING ASSOCIATES             
                                                            HC-02             193                  10/08/19   10/17/19    ERIE MECHANICAL CONTRACTORS         
                                                            HC-03             475                  01/30/20   02/27/20    ERIE MECHANICAL CONTRACTORS         
                                                            PC-01             161                  10/08/19   10/17/19    ERIE MECHANICAL CONTRACTORS         
                                                            PC-02           1,440                  10/17/19   10/21/19    ERIE MECHANICAL CONTRACTORS         
                                                            PC-03           3,583                  01/30/20   02/27/20    ERIE MECHANICAL CONTRACTORS         
                                                            RC-002        -47,948                  10/08/19   10/21/19    DIAMOND ROOFING CO.,INC.            
                                                            RC-003          4,080                  10/08/19   10/21/19    DIAMOND ROOFING CO.,INC.            
                                                            RC-004         -2,106                  10/08/19   10/21/19    DIAMOND ROOFING CO.,INC.            
                                                            TC-001         11,181                  10/08/19   10/17/19    SYRACUSE SCENERY & STAGE LIGHTING CO
                                                            WC-02             847                  07/09/20   10/07/20    BR JOHNSON, LLC                     
                                                            WC-03          -7,250                  10/13/20   02/04/21    BR JOHNSON, LLC                     
 
19-1864   Reconstruction               0-001-011  06/29/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1899   Reconstruction               0-001-012  09/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 

          Fabius Pompey High School:
93-0549   Additions and Alterations    0-005-003  02/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0062   Reconstruction               0-005-004  11/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HV-3             -306                  06/28/02   06/28/02    Wadsworth Mech.                     
 
00-0985   Additions and Alterations    0-005-005  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1              44,904                  07/17/02   07/23/02    Bette & Cring                       
                                                            1            -126,309                  03/31/05   05/02/05    Adhan Piping Co                     
                                                            10             13,643                  03/10/05     /  /      Bellucci Enterprises                
                                                            10R            28,174                  03/31/05   06/27/05    Bette Cring                         
                                                            11             25,014                  03/31/05   04/26/05    Bette Cring                         
                                                            13             29,984                  03/31/05   06/27/05    Bette Cring                         
                                                            14             42,131                  03/31/05   01/04/06    Bagnall electric                    
                                                            15             42,330                  03/31/05   01/04/06    Bagnall Electric Inc                
                                                            18             28,971                  03/31/05   05/02/05    Bette Cring                         
                                                            18              7,023                  03/31/05     /  /      Bagnall Electric                    
                                                            19               -575                  03/10/05   03/31/05    Bette Cring                         
                                                            19             43,291                  03/10/05     /  /      Bagnall Electric                    
                                                            19             43,291                  03/10/05     /  /      Bagnall electric Inc                
                                                            2              24,679                  07/17/02   07/23/02    Bette & Cring                       
                                                            2              53,000                  03/31/05   06/27/05    Adhan Piping Co Inc                 
                                                            20              8,397                  03/31/05   01/04/06    Bagnall Electric In                 
                                                            3                 701                  12/11/02   01/10/03    Bellucci Ent.                       
                                                            3              56,997                  03/10/05   03/31/05    Adhan Piping Co                     
                                                            4              85,382                  06/17/02   07/05/02    Bette & Cring                       
                                                            4              28,314                  03/31/05   01/04/06    Bellucci Enterprises                
                                                            5              10,156                  06/17/02   07/05/02    Bette & Cring                       
                                                            5              41,846                  07/29/02   10/25/02    Bagnall Elec.                       
                                                            6              36,588                  07/18/02   07/23/02    Bette & Cring                       
                                                            7              17,129                  03/31/05     /  /      Bagnall Electric                    
                                                            7              34,556                  03/31/05   01/04/06    BelluccI enterprises                
                                                            7              17,129                  06/14/05   06/30/05    Bagnall Electric                    
                                                            8              43,703                  03/31/05   01/04/06    Bagnall Electric                    
                                                            9              32,310                  03/31/05     /  /      Bagnall electric                    
                                                            bell-2          9,760                  08/19/02   10/28/02    Bellucci Ent.                       
                                                            elec-6         28,256                  08/19/02   10/28/02    JD Taylor Const.                    
 
06-0225   Reconstruction               0-005-006  12/16/06  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1334   Reconstruction               0-005-008  09/17/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2             1,453                  07/30/12   01/15/13    J&E ELECTRIC INC                    
                                                            GC-1            1,117                  11/13/12   11/16/12    J. PRIORE CONSTRUCTION CO. INC.     
                                                            GC-2           -4,510                  12/20/12   03/19/13    J. PRIORE CONSTRUCTION CO INC       
                                                            HVAC-1        -10,000                  05/18/12   11/16/12    AIRTECH HEATING & A/C SYSTEMS       
                                                            P-1             7,874                  05/18/12   11/16/12    DW & CREW MECHANICALS INC           
                                                            P-3               -81                  05/18/12   11/16/12    DW & CREW MECHANICALS INC           
 
17-0154   Reconstruction               0-005-012  05/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             318                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-02           6,038                  12/29/20   03/03/21    RIDLEY ELECTRIC CO.,INC.            
                                                            EC-04          10,656                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-05           5,942                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-06           3,217                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-12             488                  10/17/19   10/21/19    DIEKOW ELECTRIC                     
                                                            EC-13         -10,318                  01/30/20   02/27/20    DIEKOW ELECTRIC                     
                                                            GC-02             958                  09/16/20   11/13/20    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-03            -794                  10/09/19   10/15/19    MCK BUILDING ASSOCIATES             
                                                            GC-05             -40                  12/23/19   01/06/20    MCK BUILDING ASSOCIATES             
                                                            GC-06          -3,367                  08/24/20   11/05/20    MCK BUILDING ASSOCIATES             
                                                            HC-01           7,080                  10/08/19   10/17/19    ERIE MECHANICAL CONTRACTORS         
                                                            HC-04           2,200                  07/09/20   08/17/20    ERIE MECHANICAL CONTRACTORS         
                                                            RC-005         15,514                  10/08/19   10/21/19    DIAMOND ROOFING CO.,INC.            
                                                            WC-01            -216                  07/09/20   10/07/20    BR JOHNSON, LLC                     
 
19-1900   Reconstruction               0-005-013  09/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -2,705                  09/17/21   12/05/22    Bellows Construction Specialties LLC
 
22-1178   Reconstruction               0-005-014  02/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-1042   Reconstruction               0-005-015  12/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elem. Storage Bldg.:
00-0988   Additions and Alterations    2-003-001  05/22/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School Storage Building:
17-0155   Reconstruction               2-004-003  05/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
93-0550   Additions and Alterations    5-002-001  02/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0064   Reconstruction               5-002-003  11/24/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0987   Additions and Alterations    5-002-004  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            11             23,523                  03/31/05   01/04/06    Bagnall Electric                    
                                                            12              4,613                  03/31/05   01/04/06    Bagnall electric Inc                
                                                            14             20,213                  03/10/05   03/31/05    Bette Cring                         
                                                            17              1,362                  03/10/05   05/02/05    Bette Cring                         
                                                            17              9,801                  03/31/05   01/04/06    Bagnall Electric                    
                                                            21             20,554                  03/10/05   03/31/05    Bette Cring                         
                                                            6               6,231                  03/31/05     /  /      Bellucci Enteprises                 
                                                            9              31,034                  06/14/05   07/14/05    Bellucci Enterprises                
 
09-1335   Reconstruction               5-002-005  09/17/10  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0664   Reconstruction               5-002-007  12/15/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0156   Reconstruction               5-002-009  05/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-07             538                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            EC-10           1,162                  10/08/19   10/17/19    DIEKOW ELECTRIC                     
                                                            RC-001       -163,178                  10/08/19   10/21/19    DIAMOND ROOFING CO.,INC.            
 
19-1901   Reconstruction               5-002-010  09/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001        -72,873                  01/27/22   01/25/23    Upstate Comps I LLC                 
                                                            GC-002          3,512                  11/08/21   11/17/22    Bellows Const Specialties, LLC      
 

          Toilet/Concession Building:
12-1337   New Construction             7-007-001  12/06/13  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide Telephone System:
91-0552   Reconstruction               7-999-001  01/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE

WESTHILL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-07-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Onondaga Hill Middle School:
91-0497   Reconstruction               0-001-001  12/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1456   Reconstruction               0-001-002  05/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1442   Additions and Alterations    0-001-003  08/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0891   Reconstruction               0-001-004  07/07/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            011            27,953                  05/16/05   06/20/05    J and E Electric                    
                                                            016             3,734                  06/15/05   05/05/06    J and E Electric                    
 
02-0967   Reconstruction               0-001-005  03/15/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006               606                  05/16/05   07/13/05    J and E Elecric                     
 
07-0730   Reconstruction               0-001-007  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            007            -3,678                  04/22/10   07/27/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            013            -2,219                  05/11/11   06/03/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            017             9,277                  12/23/09   02/09/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            032              -198                  04/22/10   07/27/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-001          1,360                  12/04/08   05/15/09    PAC & ASSOCIATES OF OSWEGO, INC.    
 
10-0641   Additions and Alterations    0-001-008  05/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,000                  12/19/11   09/26/12    BETTE & CRING LLC                   
                                                            002               427                  12/19/11   09/26/12    BELLUCCI ENTERPRISES INC            
                                                            EC-002        -15,365                  01/06/12   09/26/12    HUEN NEW YORK INC                   
                                                            EC-004          9,524                  03/23/12   07/31/13    HUEN NEW YORK INC                   
                                                            EC-007          3,113                  08/23/12   10/18/13    HUEN NEW YORK INC                   
                                                            EC-008          4,250                  08/23/12   10/18/13    HUEN NEW YORK INC                   
                                                            EC-009          2,057                  08/23/12   10/18/13    HUEN NEW YORK INC                   
                                                            EC-013          1,847                  01/08/13   02/14/14    HUEN NEW YORK INC                   
                                                            EC-019         14,551                  04/19/13   02/21/14    HUEN NEW YORK INC                   
                                                            EC-025          9,984                  06/12/13   06/12/14    HUEN NEW YORK INC                   
                                                            EC-029         23,790                  07/24/13   02/21/14    Huen New York Inc.                  
                                                            EC-032         13,922                  10/29/13   11/22/13    Huen New York Inc.                  
                                                            EC-034          1,929                  12/20/13   06/12/14    Huen New York, Inc.                 
                                                            GC-003         85,000                  03/23/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-004         -4,053                  03/23/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-005          7,779                  03/23/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-006              0                  04/02/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-007              0                  04/02/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-011         16,440                  05/14/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-012              0                  05/14/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-015         18,397                  06/11/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-022         13,397                  08/23/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-023         13,370                  08/23/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-024         12,090                  08/23/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-027         36,024                  10/09/12   06/06/13    BETTE & CRING LLC                   
                                                            GC-028        181,590                  10/31/12   06/05/13    BETTE & CRING LLC                   
                                                            GC-031              0                  10/31/12   06/05/13    BETTE & CRING LLC                   
                                                            GC-042         10,052                  01/08/13   02/21/14    BETTE & CRING LLC                   
                                                            GC-044          9,483                  01/23/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-049         17,283                  02/06/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-050         18,874                  02/06/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-052         12,017                  03/22/13   06/14/13    BETTE & CRING LLC                   
                                                            GC-058              0                  04/19/13   11/25/13    BETTE & CRING LLC                   
                                                            GC-062          5,723                  06/12/13   07/26/13    BETTE & CRING LLC                   
                                                            GC-066         36,936                  07/01/13   02/21/14    Bette & Cring LLC                   
                                                            GC-072          9,675                  07/24/13   07/26/13    Bette & Cring LLC                   
                                                            GC-076          2,283                  08/22/13   09/13/13    Bette & Cring LLC                   
                                                            GC-078          5,725                  11/25/13   12/24/13    BETTE & CRING LLC                   
                                                            HC-001         14,588                  10/08/13   06/12/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            HC-005          7,012                  10/08/13   06/12/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            PC-003          8,177                  12/19/11   09/26/12    BELLUCCI ENTERPRISES INC            
                                                            PC-005              0                  03/23/12     /  /      BELLUCCI ENTERPRISES INC            
                                                            PC-006              0                  03/23/12     /  /      BELLUCCI ENTERPRISES INC            
                                                            PC-007              0                  04/02/12   09/26/12    BELLUCCI ENTERPRISES INC            
                                                            PC-010              0                  10/09/12   06/05/13    BELLUCCI ENTERPRISES INC            
 
16-0002   Reconstruction               0-001-009  12/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-009         -1,813                  08/10/18   06/24/19    HUEN NEW YORK INC                   
                                                            GC-025          9,011                  10/05/18   11/06/18    MCK BUILDING ASSOCIATES INCC        
                                                            GC-045            918                  04/01/19   04/25/19    MCK BUILDING ASSOCIATES, INC.       
                                                            SC-002          5,364                  12/11/17   02/13/18    Cunningham Excavation, Inc.         
                                                            SC-003         25,249                  01/29/18   02/21/18    Cunningham Excavation, Inc.         
                                                            SC-008          6,830                  08/03/18   09/06/18    CUNNINGHAM EXCAVATION INC           
                                                            SC-010            304                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-011              0                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-015          2,414                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-018           -176                  03/15/19   03/18/19    CUNNINGHAM EXCAVATION, INC.         
 
18-0667   Reconstruction               0-001-011  12/31/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0333   Reconstruction               0-001-012  10/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1489   Reconstruction               0-001-013  10/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02            165,202                  03/14/22   02/17/23    Sessler Envirns Servs LLC           
                                                            EC2-001          -275                  06/16/21   03/22/22    Diekow Electric INC                 
                                                            EC2-003         5,734                  08/25/21   11/25/22    DIEKOW ELECTRIC, INC                
                                                            EC2-006           920                  10/15/21   12/05/22    Diekow Electric, Inc                
                                                            EC2-009         2,801                  06/21/22   05/04/23    Diekow Elec Inc                     
                                                            GC2-006         7,820                  06/16/21   03/15/22    J.Priore Construction               
                                                            GC2-007         3,430                  06/24/21   03/11/22    J.Priore Construction Co            
                                                            GC2-009         9,195                  06/24/21   03/11/22    J.Priore Construction               
                                                            GC2-015         1,627                  09/10/21   11/29/22    J Priore Construction Co, Inc       
                                                            GC2-017        27,306                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-019         1,073                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-023         4,782                  02/28/22   02/17/23    Priore Const Co Inc                 
                                                            GC2-024           970                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-027        11,995                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-029         1,945                  02/28/22   04/05/23    J Priore Const Co Inc               
                                                            GC2-030         6,888                  03/14/22   02/22/23    J Priore Const Co Inc               
                                                            GC2-035        -1,970                  08/05/22   12/22/23    Priore Const Co Inc                 
 
02-0690FP Reconstruction               0-001-FP1  03/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Walberta Park School:
90-1332   Additions and Alterations    0-002-003  05/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1457   Reconstruction               0-002-004  05/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0892   Reconstruction               0-002-005  07/07/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            012             3,429                  05/16/05   06/20/05    J and E Electric                    
                                                            017               939                  06/15/05   05/05/06    J and E Electric                    
 
02-0968   Reconstruction               0-002-006  03/15/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004             3,697                  05/16/05   07/13/05    J and E Electric                    
 
07-0731   Reconstruction               0-002-007  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  04/28/10   05/11/10    PAUL F. VITALE, INC.                
                                                            002             7,700                  12/04/08   04/21/09    PAUL F. VITALE, INC.                
                                                            002           -42,207                  10/13/09   10/28/09    BURNS BROTHERS CONTRACTORS INC      
                                                            003             3,000                  01/09/09   05/08/09    PAUL F. VITALE, INC.                
                                                            003             1,584                  01/08/09   05/20/09    EDGELINE ELECTRIC CORP.             
                                                            004             2,473                  05/21/09   07/20/09    PAUL F. VITALE, INC.                
                                                            004             7,159                  03/12/10   06/14/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            005                 0                  03/18/10   06/14/10    BURNS BROTHERS CONTRACTORS INC      
                                                            005                 0                  04/28/10   05/11/10    PAIL F. VIATLE, INC.                
                                                            006             4,935                  04/28/10   05/11/10    PAUL F. VITALE, INC.                
                                                            007             7,888                  04/22/10   07/27/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            008            42,207                  02/13/09   04/03/09    PAC ASSOCIATES OF OSWEGO, INC.      
                                                            008             2,913                  10/13/09   10/28/09    EDGELINE ELECTRIC CORP              
                                                            012             3,137                  12/23/09   02/09/10    EDGELINE ELECTRIC CORP              
                                                            014            24,167                  10/13/09   10/28/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            014             3,308                  02/01/10   09/19/11    EDGELINE ELECTRIC CORP              
                                                            015            21,042                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            016             6,128                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            018             2,235                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            027                 0                  03/18/10   06/14/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            030              -161                  04/22/10   07/27/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            PC-016            552                  03/22/13   07/03/13    BELLUCCI ENTERPRISES INC            
 
10-0642   Reconstruction               0-002-008  05/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-005          8,473                  08/23/12   10/18/13    HUEN NEW YORK INC                   
                                                            EC-015          8,387                  03/22/13   02/21/14    HUEN NEW YORK INC                   
                                                            EC-023          9,910                  06/12/13   06/12/14    HUEN NEW YORK INC                   
                                                            EC-027          8,610                  07/24/13   02/21/14    Huen New York Inc.                  
                                                            EC-036          6,374                  12/20/13   06/12/14    Huen New York, Inc.                 
                                                            EC-20           2,372                  04/19/13   02/21/14    HUEN NEW YORK INC                   
                                                            GC-010              0                  04/02/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-033              0                  10/31/12   06/05/13    BETTE & CRING LLC                   
                                                            GC-043         12,435                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-048         12,396                  02/06/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-051         10,200                  03/22/13   06/19/13    BETTE & CRING LLC                   
                                                            GC-060         -1,836                  06/12/13   07/26/13    BETTE & CRING LLC                   
                                                            GC-070         16,204                  07/24/13   07/26/13    Bette & Cring LLC                   
                                                            HC-006         12,272                  10/08/13   06/12/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            PC-004          2,928                  12/19/11   09/26/12    BELLUCCI ENTERPRISES INC            
                                                            PC-018            990                  06/12/13   06/12/14    BELLUCCI ENTERPRISES INC            
                                                            PC-12           2,872                  01/08/13   02/21/14    BELLUCCI ENTERPRISES INC            
 
16-0003   Reconstruction               0-002-009  12/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-001         13,925                  12/11/17   02/13/18    Cunningham Excavation, Inc.         
                                                            SC-006         10,018                  04/16/18   05/02/18    Cunningham Excavation, Inc.         
                                                            SC-019           -176                  03/15/19   03/18/19    CUNNINGHAM EXCAVATION, INC          
 
19-1490   Reconstruction               0-002-010  10/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-010         1,509                  06/21/22   04/27/23    Diekow Elec Inc                     
                                                            GC2-018       -39,025                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-022         1,574                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-032         3,383                  05/05/22   05/09/23    J Priore Const Co Inc               
                                                            GC2-034         4,024                  08/05/22   12/22/23    Priore Const Co Inc                 
 
22-1597   Reconstruction               0-002-011  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1595   Reconstruction               0-002-012  10/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0298   Reconstruction               0-002-013  09/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cherry Road School:
91-0498   Additions and Alterations    0-003-001  12/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0406   Reconstruction               0-003-003  01/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0893   Reconstruction               0-003-004  07/07/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            015            13,971                  06/15/05   05/05/06    J and E electric                    
 
02-0969   Reconstruction               0-003-005  03/15/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005             1,238                  05/16/05   07/13/05    J and E Electric                    
 
07-0732   Reconstruction               0-003-007  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,038                  01/09/09   05/20/09    AIRTECH HEATING & AIR CONDITIONOING 
                                                            001            -6,557                  05/08/09   07/06/09    BURNS BROTHERS CONTRACTORS, INC.    
                                                            004              -845                  02/01/10   09/19/11    EDGELINE ELECTRIC CORP              
                                                            004            -8,715                  04/22/10   07/27/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            005                 0                  01/09/09   05/22/09    EDGELINE ELECTRIC CORP.             
                                                            005            14,207                  01/15/09   01/27/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            007             3,718                  02/13/09   04/03/09    EDGELINE ELECTRIC CORP.             
                                                            009            16,925                  02/13/09   04/03/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            009            -2,886                  10/13/09   01/29/10    EDGELINE ELECTRIC CORP              
                                                            010                 0                  03/12/10   06/14/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            012            -4,053                  05/11/11   06/03/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            019              -558                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            025               626                  02/01/10   03/16/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            031              -233                  04/22/10   07/27/10    PAC & ASSOCIATES OF OSWEGO INC      
 
10-0643   Additions and Alterations    0-003-008  05/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -12,224                  01/06/12   09/26/12    HUEN NEW YORK INC                   
                                                            001           -16,700                  12/19/11   06/17/19    BELLUCCI ENTERPRISES INC            
                                                            002           -12,568                  12/19/11   10/23/12    BETTE & CRING LLC                   
                                                            EC-003         -3,899                  03/23/12   07/31/13    HUEN NEW YORK                       
                                                            EC-006          3,594                  08/23/12   10/18/13    HUEN NEW YORK INC                   
                                                            EC-010          1,491                  08/23/12   10/18/13    HUEN NEW YORK INC                   
                                                            EC-021        -28,013                  05/02/13   02/21/14    Huen New York Inc.                  
                                                            EC-024          9,569                  06/12/13   06/12/14    HUEN NEW YORK INC                   
                                                            EC-028         24,176                  07/24/13   02/21/14    Huen New York Inc.                  
                                                            EC-037          3,396                  12/20/13   06/12/14    Huen New York, Inc.                 
                                                            GC-008         25,347                  04/02/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-009          7,474                  04/02/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-014          2,799                  05/14/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-016         12,728                  07/06/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-020         11,780                  08/23/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-021         14,640                  08/23/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-025          6,584                  10/09/12   06/06/13    BETTE & CRING LLC                   
                                                            GC-032              0                  10/31/12   06/05/13    BETTE & CRING LLC                   
                                                            GC-034          2,802                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-038          9,012                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-040          5,513                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-045          8,748                  01/23/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-046          9,368                  02/06/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-047          1,500                  02/06/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-054         -6,908                  03/22/13   06/19/13    BETTE & CRING LLC                   
                                                            GC-055         13,320                  03/22/13   06/14/13    BETTE & CRING LLC                   
                                                            GC-061        -99,618                  06/12/13   07/26/13    BETTE & CRING LLC                   
                                                            GC-073          7,003                  08/22/13   09/13/13    Bette & Cring LLC                   
                                                            GC-077          3,081                  10/29/13   11/22/13    Bette & Cring LLC                   
                                                            GC-45           8,748                  07/01/13   07/19/13    Bette & Cring LLC                   
                                                            HC-003        -25,161                  10/08/13   06/12/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            PC-008              0                  03/23/12   07/31/13    BELLUCCI ENTERPRISES, INC           
                                                            PC-009              0                  07/05/12   10/18/13    BELLUCCI ENTERPRISES INC            
                                                            PC-011          4,498                  01/08/13   02/14/14    BELLUCCI ENTERPRISES INC            
                                                            PC-014          1,234                  01/08/13   02/14/14    BELLUCCI ENTERPRISES INC            
                                                            PC-015        -29,081                  03/22/13   02/21/14    BELLUCCI ENTERPRISES INC            
                                                            PC-019         14,962                  06/12/13   06/12/14    BELLUCCI ENTERPRISES INC            
 
18-1889   Reconstruction               0-003-010  04/25/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C&S-01        -18,810                  01/24/20   02/19/20    C&S TECHNICAL RESOURCES, INC.       
                                                            PEC-01         16,865                  01/24/20   02/19/20    PATRICIA ELECTRIC, INC.             
 
19-1491   Reconstruction               0-003-011  10/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-004        13,735                  09/27/21   06/14/22    Diekow Electric, Inc                
                                                            EC2-007           756                  10/15/21   12/05/22    Diekow Electric, Inc                
                                                            EC2-011         2,155                  06/21/22   04/27/23    Diekow Elec Inc                     
                                                            GC2-001           696                  06/16/21   03/15/22    J.Priore Construction               
                                                            GC2-008        21,205                  06/16/21   03/15/22    J.Priore Construction               
                                                            GC2-011         1,485                  08/16/21   05/06/22    J PRIORE CONSTRUCTION CO, INC       
                                                            GC2-013         7,983                  09/10/21   11/29/22    J. Priore Construction Co, Inc      
                                                            GC2-014        11,253                  09/10/21   11/29/22    J Priore Construction Co, Inc       
                                                            GC2-021         5,044                  01/10/21     /  /      Priore Const Co Inc                 
                                                            GC2-028       -13,245                  02/28/22   04/05/23    Priore Const Co Inc                 
                                                            GC2-033       -11,000                  08/05/22   12/22/23    Priore Const Co Inc                 
 
20-0577   Reconstruction               0-003-012  12/19/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-001            741                  06/25/21   03/14/22    Hoefler Communications              
                                                            CO-001         22,080                  06/25/21   03/14/22    Hoefler Communications              
 
22-1598   Reconstruction               0-003-013  05/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1596   Reconstruction               0-003-014  10/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Westhill High School:
91-0499   Alterations                  0-004-001  12/20/91  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            031            -5,631                  12/09/05   12/15/05    Bette & Cring LLC                   
 
96-0405   Alterations                  0-004-002  01/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1424   Reconstruction               0-004-003  07/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0894   Additions and Alterations    0-004-004  07/07/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001           -32,194                  03/11/04   03/24/04    J&E Elec.                           
                                                            001           -28,919                  04/02/04   04/27/05    Bette Cring                         
                                                            001                 0                  01/19/05   05/12/05    Airtech Heating and Air Conditioning
                                                            001                 0                  09/16/05   10/05/05    Brosh mechanical                    
                                                            001             6,225                  09/16/05   10/05/05    siemens Building Tech               
                                                            002            17,163                  04/14/05   04/26/05    Bette Cring                         
                                                            002            10,038                  06/15/05   05/05/06    Airtech heating Air Cond            
                                                            002                 0                  06/15/05   05/05/06    Brosh Mechanical                    
                                                            003                 0                  01/19/05   05/12/05    J and E Electric Inc                
                                                            003            19,505                  04/14/05   04/26/05    Bette Cring                         
                                                            003                 0                  12/09/05   05/05/06    Airtech heating Air Cond            
                                                            003                 0                  12/09/05   05/05/06    Brosh mechanical                    
                                                            004             3,813                  12/09/05   05/05/06    Airtech Heating Air Cond            
                                                            004            -5,900                  12/09/05   05/05/06    Brosh mechanical                    
                                                            005            16,463                  05/01/05   06/15/05    Bette Cring                         
                                                            005            11,858                  12/09/05   05/05/06    Airtech Heating Air Cond            
                                                            006            17,042                  05/01/05   06/21/05    Bette Cring                         
                                                            007             6,489                  05/01/05   06/15/05    Bette Cring                         
                                                            007             6,902                  05/16/05   06/20/05    J and E Electric                    
                                                            008             8,859                  01/19/05   07/25/05    J and e electric Inc                
                                                            008                 0                  05/11/05   06/20/05    Bette Cring                         
                                                            009                 0                  05/11/05   06/14/05    Bette Cring                         
                                                            009             3,812                  05/16/05   06/14/05    J and E Electric                    
                                                            010            13,160                  05/11/05   06/14/05    Bette Cring                         
                                                            010            16,282                  05/16/05   06/14/05    J and E Electric                    
                                                            011            14,918                  05/11/05   06/14/05    Bette Cring                         
                                                            012            10,879                  05/11/05   06/14/05    Bette Cring                         
                                                            013            13,505                  05/11/05   06/14/05    Bette Cring                         
                                                            013             6,952                  05/16/05   06/14/05    J and E Electric                    
                                                            014            10,360                  05/11/05   06/06/06    Bette Cring                         
                                                            014            11,585                  06/15/05   05/05/06    J and E Electric                    
                                                            015            13,419                  05/11/05   06/14/05    Bette Cring                         
                                                            016                 0                  05/11/05   06/14/05    Bette Cring                         
                                                            017            13,973                  05/11/05   06/14/05    Bette Cring                         
                                                            018             4,781                  05/11/05   06/14/05    Bette Cring                         
                                                            019             4,072                  05/16/05   06/14/05    Bette Cring                         
                                                            019             4,069                  09/16/05   09/21/05    J and E electric                    
                                                            020            16,504                  05/16/05   06/14/05    Bette Cring                         
                                                            020             3,698                  12/09/05   05/05/06    J and E electric                    
                                                            021            19,057                  05/16/05   06/14/05    Bette Cring                         
                                                            021                 0                  12/09/05   05/05/06    J and E Electric                    
                                                            022             5,409                  05/16/05   06/14/05    Bette Cring                         
                                                            022            22,341                  12/09/05   05/05/06    J and E Electric                    
                                                            023             7,406                  05/16/05   06/14/05    Bette Cring                         
                                                            024            10,939                  06/15/05   06/06/06    Bette Cring                         
                                                            025            11,063                  06/15/05   06/06/06    Bette Cring                         
                                                            026            11,340                  06/15/05   06/06/06    Bette Cring                         
                                                            027               667                  06/15/05   06/06/06    Bette Cring                         
                                                            028            19,934                  06/15/05   06/06/06    Bette Cring                         
                                                            029             7,221                  12/09/05   06/06/06    Bette Cring                         
                                                            030                 0                  12/09/05   06/06/06    Bette Cring                         
                                                            031            -5,298                  12/09/05   06/06/06    Bette Cring                         
                                                            AD 004              0                  05/01/05   06/15/05    Bette Cring                         
 
02-0970   Reconstruction               0-004-005  03/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0733   Reconstruction               0-004-006  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001              -228                  01/09/09   05/20/09    EDGELINE ELECTRIC CORP.             
                                                            002                 0                  01/09/09   05/20/09    EDGELINE ELECTRIC CORP.             
                                                            002                 0                  01/09/09     /  /      EDGELINE ELECTRIC CORP.             
                                                            002             4,178                  02/01/10   02/13/12    AIRTECH HEATING & AIR CONDITIONING  
                                                            003             1,686                  01/16/09   01/27/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            003             5,152                  01/08/10   04/23/10    BURNS BROTHERS CONTRACTORS INC      
                                                            003                 0                  02/01/10   09/19/11    AIRTECH HEATING & AIR CONDITIONING  
                                                            004            -1,123                  03/12/10   06/14/10    BURNS BROTHERS CONTRACTORS INC      
                                                            005             3,737                  04/22/10   07/27/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            006            -1,413                  02/13/09   04/03/09    EDGELINE ELECTRIC CORP.             
                                                            006             1,363                  01/26/09   04/03/09    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            006                 0                  03/18/10   06/14/10    BURNS BROTHERS CONTRACTORS INC      
                                                            006            19,636                  04/22/10   08/04/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            007            -3,290                  03/18/10   06/14/10    BURNS BROTHERS CONTRACTORS INC      
                                                            008                 0                  05/11/11   06/03/11    AIRTECH HEATING & AIR CONDITIONING  
                                                            009            -3,000                  05/11/11   06/03/11    AIRTECH HEATING & AIR CONDITIONING  
                                                            010             3,734                  10/13/09   10/28/09    EDGELINE ELECTRIC CORP              
                                                            011             7,168                  10/13/09   10/28/09    PAC & ASSOCIATES OF OSWEGO INC      
                                                            011                 0                  12/23/09   02/09/10    EDGELINE ELECTRIC CORP              
                                                            013               294                  02/01/10   09/19/11    EDGELINE ELECTRIC CORP              
                                                            015             8,141                  02/01/10   09/19/11    EDGELINE ELECTRIC CORP              
                                                            016                 0                  03/12/10   06/14/10    EDGELINE ELECTRIC CORP              
                                                            017            -1,179                  03/12/10   06/14/10    EDGELINE ELECTRIC CORP              
                                                            020            15,021                  05/11/11   06/03/11    PAC & ASSOCIATES OF OSWEGO INC      
                                                            021            15,769                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            022             8,619                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            023                 0                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            024            35,672                  01/08/10   04/23/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            026                 0                  03/18/10   06/14/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            028           -15,653                  02/01/10   03/16/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            029             6,350                  04/28/10   05/11/10    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            033            -6,448                  04/22/10   07/27/10    PAC & ASSOCIATES OF OSWEGO INC      
                                                            GC-002          1,695                  12/04/08   04/21/09    PAC & ASSOCIATES OF OSWEGO, INC.    
 
10-0644   Additions and Alterations    0-004-007  05/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            14,496               4  05/05/14     /  /      Syracuse Scenery & Stage Lighting Co
                                                            002              -504                  05/05/14   05/30/14    Syracuse Scenery & Stage Ltg Co Inc 
                                                            EC-003          9,410                  12/20/13   06/12/14    Huen New York Inc.                  
                                                            EC-014          5,807                  03/22/13   02/21/14    HUEN NEW YORK INC                   
                                                            EC-016         10,568                  03/22/13   02/21/14    HUEN NEW YORK INC                   
                                                            EC-017         15,781                  03/22/13   02/21/14    HUEN NEW YORK INC                   
                                                            EC-022         10,676                  06/12/13   06/12/14    HUEN NEW YORK INC                   
                                                            EC-026         10,808                  06/12/13   06/12/14    HUEN NEW YORK INC                   
                                                            EC-030          4,200                  07/24/13   02/21/14    Huen New York Inc.                  
                                                            EC-12           2,603                  01/08/13   02/21/14    HUEN NEW YORK INC                   
                                                            GC-013              0                  05/14/12   09/26/12    BETTE & CRING LLC                   
                                                            GC-018          3,413                  07/06/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-019              0          26,000  08/23/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-026         -4,592                  10/09/12   06/06/13    BETTE & CRING LLC                   
                                                            GC-029          2,938                  10/31/12   06/05/13    BETTE & CRING LLC                   
                                                            GC-030         -1,960                  10/31/12   06/05/13    BETTE & CRING LLC                   
                                                            GC-035          4,428                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-036         73,215                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-037         37,868                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-039         15,167                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-041          3,657                  01/08/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-053         21,912                  03/22/13   06/17/13    BETTE & CRING LLC                   
                                                            GC-056          5,496                  03/22/13   06/14/13    BETTE & CRING LLC                   
                                                            GC-059              0                  04/19/13   07/09/13    BETTE & CRING LLC                   
                                                            GC-063          5,510                  06/12/13   07/26/13    BETTE & CRING LLC                   
                                                            GC-064         15,386                  06/12/13   07/26/13    BETTE & CRING LLC                   
                                                            GC-067         45,140                  07/01/13   07/19/13    Bette & Cring LLC                   
                                                            GC-068         20,831                  07/24/13   07/26/13    Bette & Cring LLC                   
                                                            GC-071          3,885                  06/24/13   07/26/13    Bette & Cring LLC                   
                                                            GC-074         -5,030                  08/22/13   09/13/13    Bette & Cring LLC                   
                                                            GC-079          5,608                  11/25/13   12/24/13    BETTE & CRING LLC                   
                                                            HC-002          7,320                  10/08/13   06/12/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            HC-004         21,190                  10/08/13   06/12/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            HC-007          4,041                  10/08/13   06/12/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            PC-13           4,827                  01/08/13   02/21/14    BELLUCCI ENTERPRISES INC            
                                                            TC-001        -13,930                  11/01/13   06/12/14    SYRACUSE SCENERY & STAGE LIGHTING CO
 
16-0005   Reconstruction               0-004-008  12/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-001            887                  12/11/17   02/02/18    Huen New York, Inc.                 
                                                            EC-001            887                  01/29/18   03/08/18    Huen New York                       
                                                            EC-002          3,539                  11/16/17   12/01/17    Huen New York, Inc.                 
                                                            EC-004          3,806                  01/29/18   03/08/18    Huen New York                       
                                                            EC-005          2,704                  06/04/18   06/29/18    HUEN NEW YORK                       
                                                            EC-006          1,464                  07/02/18   07/24/18    HUEN NEW YORK INC                   
                                                            EC-007         11,615                  08/03/18   06/24/19    HUEN NEW YORK                       
                                                            EC-008          3,511                  08/10/18   06/24/19    HUEN NEW YORK INC                   
                                                            EC-010          2,811                  10/01/18   10/11/18    HUEN NEW YORK                       
                                                            EC-011          3,041                  10/05/18   10/11/18    HUEN NEW YORK                       
                                                            EC-014              0                  12/03/18   01/25/19    HUEN NEW YORK INC                   
                                                            EC-015          3,729                  12/03/18   01/25/19    HUEN NEW YORK INC                   
                                                            EC-016          3,974                  12/03/18   01/25/19    HUEN NEW YORK INC                   
                                                            EC-017            586                  12/03/18   01/25/19    HUEN NEW YORK INC                   
                                                            EC-018          2,695                  12/03/18   01/25/19    HUEN NEW YORK INC                   
                                                            EC-019          1,051                  02/04/19   02/25/19    HUEN NEW YORK, INC.                 
                                                            EC-020          1,525                  02/04/19   02/25/19    HUEN NEW YORK, INC.                 
                                                            EC-021          3,261                  02/04/19   02/25/19    HUEN NEW YORK, INC.                 
                                                            EC-022            989                  03/15/19   03/18/19    HUEN NEW YORK                       
                                                            GC-001         21,551                  09/07/17   09/14/17    MCK Building Assocaites, Inc.       
                                                            GC-002          3,058                  10/04/17   10/17/17    MCK Building Associates, Inc.       
                                                            GC-003          4,558                  10/25/17   11/08/17    MCK Building Associates, Inc.       
                                                            GC-004          8,576                  10/25/17   11/08/17    MCK Building Associates, Inc.       
                                                            GC-005         25,608                  11/16/17   12/05/17    MCK Building Associates, Inc.       
                                                            GC-006          1,672                  02/28/18   03/06/18    MCK Building Associates, Inc.       
                                                            GC-007         12,054                  01/29/18   02/21/18    MCK Building Associates, Inc.       
                                                            GC-008          6,446                  01/26/18   02/21/18    MCK Building Associates, Inc.       
                                                            GC-009          4,042                  01/29/18   02/21/18    MCK Building Associates, Inc.       
                                                            GC-010          4,904                  02/14/18   03/07/18    MCK Building Associates, Inc.       
                                                            GC-011         31,010                  02/14/18   03/07/18    MCK Building Associates, Inc.       
                                                            GC-012          2,394                  03/12/18   03/22/18    MCK Building Associates, Inc.       
                                                            GC-013          5,273                  04/02/18   04/12/18    MCK Building Associates, Inc.       
                                                            GC-014         31,480                  04/16/18   05/02/18    MCK Building Associates, Inc.       
                                                            GC-015          8,045                  04/16/18   05/02/18    MCK Building Associates, Inc.       
                                                            GC-016         12,577                  06/04/18   07/24/18    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-019          5,409                  07/02/18   07/24/18    MCK BUILDING ASSOCIATES INC         
                                                            GC-020         10,037                  07/26/18   08/01/18    MCK BUILDING ASSOCIATES INC         
                                                            GC-021         33,481                  07/26/18   08/01/18    MCK BUILDING ASSOCIATES INC         
                                                            GC-022          7,813                  08/03/18   09/06/18    MCK BUILDING ASSOCIATES INC         
                                                            GC-023          6,421                  08/03/18   09/06/18    MCK BUILDINGASSOCIATES INC          
                                                            GC-026          8,068                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            GC-027         16,623                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            GC-028         22,269                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            GC-029              0                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            GC-030              0                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            GC-032              0                  12/03/18   02/08/19    MCK BUILDINING ASSOCIATES INC       
                                                            GC-033              0                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            GC-034              0                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            GC-035          9,844                  02/04/19   03/15/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-036          3,146                  02/04/19   03/15/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-037              0                  02/04/19   03/15/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-038              0                  02/04/19   03/15/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-039            461                  03/15/19   03/18/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-040            302                  02/04/19   03/15/19    MCK BUILDING ASSOCIATES,INC.        
                                                            GC-041         -5,817                  03/15/19   03/18/19    MCK BUILDING ASSOCIATES, INC        
                                                            GC-042         16,886                  03/15/19   03/18/19    MCK BUILDING ASSOCIATES, INC        
                                                            GC-043          6,785                  04/08/19   04/25/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-044          1,755                  04/01/19   04/25/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC-046         11,026                  04/01/19   04/25/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC017           4,034                  06/06/18   07/24/18    MCK BUILDING ASSOCIATES INC         
                                                            GC018          25,180                  06/25/18   07/24/18    MCK BUILDING ASSOCIATES             
                                                            MC-001            626                  11/16/17   12/01/17    HMI Mechanical Systems, Inc.        
                                                            MC-003          2,888                  12/03/18   01/25/19    HMI MECHANICAL SYSTEMS INC          
                                                            MC-004              0                  12/03/18   01/25/19    HMI MECHANICAL SYSTEMS INC          
                                                            MC-005              0                  12/05/18   01/25/19    HMI MECHANICAL SYSTEMS INC          
                                                            MC-006         13,790                  12/26/18   02/04/19    HMI MECHANICAL SYSTEMS INC          
                                                            MC-007         -1,874                  04/01/19   04/02/19    HMI MECHANICAL SYSTEMS, INC.        
                                                            MC-008         -1,158                  04/08/19   04/12/19    HMI MECHANICAL SYSTEMS, INC.        
                                                            MC002           1,643                  06/11/18   06/29/18    HMI MECHANICAL INC                  
                                                            PC-002          8,886                  04/02/18   04/04/18    Bellucci Enterprises, Inc.          
                                                            PC-003          2,323                  09/26/18   10/01/18    BELLUCCI ENTERPRISES INC            
                                                            PC-004              0                  12/03/18   01/25/19    BELLUCCI ENTERPRISES INC            
                                                            PC-005              0                  12/03/18   01/25/19    BELLUCCI ENTERPRISES INC            
                                                            PC-006          8,842                  12/03/18   01/25/19    BELLUCI ENTERPRISES INC             
                                                            PC-007          6,407                  12/03/18   01/25/19    BELLUCCI ENTERPRISES INC            
                                                            RC-002         17,310                  08/10/18   09/06/18    PULVER ROOFING COMPANY              
                                                            RC-003              0                  03/15/19   03/18/19    PULVER ROOFING COMPANY              
                                                            RC-004              0                  03/15/19   03/18/19    PULVER ROOFING COMPANY              
                                                            RC-005          5,766                  03/15/19   03/18/19    PULVER ROOFING COMPANY              
                                                            RC-006           -377                  04/08/19   04/25/19    PULVER ROOFING CO.                  
                                                            RC001           3,014                  06/06/18   07/24/18    PULVER ROOFING CO                   
                                                            SC-004         10,046                  02/14/18   03/07/18    Cunningham Excavation, Inc.         
                                                            SC-005         34,014                  04/02/18   04/12/18    Cunningham Excavation, Inc.         
                                                            SC-007          9,550                  06/04/18   07/24/18    CUNNINGHAM EXCAVATION, INC.         
                                                            SC-009          5,910                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-012              0                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-013              0                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-014          1,058                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-016         34,669                  12/03/18   02/08/19    CUNNINGHAM EXCAVATION INC           
                                                            SC-017          3,270                  03/15/19   03/18/19    CUNNINGHAM EXCAVATION, INC          
 
17-0385   Reconstruction               0-004-009  11/24/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1492   Reconstruction               0-004-010  10/14/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-002        -1,942                  08/25/21   11/25/22    DIEKOW ELECTRIC, INC                
                                                            EC2-005        13,714                  10/15/21   12/05/22    Diekow Electric, Inc                
                                                            EC2-008         3,334                  03/03/22   12/06/22    Diekow Elec Inc                     
                                                            GC2-002         4,189                  06/16/21   03/15/22    J.Priore Construction               
                                                            GC2-003         3,536                  06/16/21   03/15/22    J.Priore Construction               
                                                            GC2-004         4,335                  06/16/21   03/15/22    J.Priore Construction               
                                                            GC2-005         2,710                  06/16/21   03/15/22    J. Priore Construction              
                                                            GC2-010        16,721                  08/16/21   05/06/22    J PRIORE CONSTRUCTION CO, INC       
                                                            GC2-012         8,732                  09/10/21   11/29/22    J Priore Construction Co, Inc       
                                                            GC2-018         1,128                  09/10/21   11/29/22    J Priore Construction Co, Inc       
                                                            GC2-025         1,154                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-026        -6,340                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            GC2-031         2,966                  03/14/22   02/22/23    J Priore Const Co Inc               
                                                            GC2-20          3,592                  01/10/22   01/04/23    Priore Const Co Inc                 
                                                            PC2-001         5,121                  01/10/22   11/08/22    Brosh Mech Inc                      
 
20-1236   Reconstruction               0-004-011  02/15/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-005         26,469                  04/10/23   12/27/23    OSWEGO MECHANICAL                   
                                                            CO-006         14,513                  04/10/23   12/27/23    OSWEGO MECHANICAL                   
                                                            CO-017          3,931                  04/10/23   12/21/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            CO-018         16,181                  04/10/23   12/21/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            CO-019          6,611                  04/10/23   12/21/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            EC3-001           467                  06/21/22   04/27/23    Billitier Elec Inc                  
                                                            EC3-001         1,341                  06/21/22     /  /      C&S Tech Resources Inc              
                                                            EC3-002         8,975                  11/09/22   11/02/23    BILLITIER ELEC. INC                 
                                                            EC3-003         7,622                  11/14/22   07/27/23    BILLITIER ELEC INC                  
                                                            EC3-004         4,694                  07/17/23   12/28/23    BILLITIER ELECTRIC                  
                                                            EC3-005         5,232                  07/17/23   12/28/23    BILLITIER ELECTRIC                  
                                                            EC3-006         4,566                  07/17/23   12/28/23    BILLITIER ELECTRICAL                
                                                            EC3-007         5,819                  07/17/23   12/28/23    BILLITIER ELECTRIC                  
                                                            GC-003         42,807                  08/05/22   12/22/23    Bette&Cring Const Group             
                                                            GC3-001         9,077                  07/21/22   05/05/23    Bette&Cring Const Group             
                                                            GC3-002         1,477                  07/21/22   05/05/23    Bette&Cring Const Group             
                                                            GC3-004         1,203                  08/22/22   12/14/23    Bette&Cring Const Group             
                                                            GC3-005         8,504                  09/06/22   06/29/23    Bette&Cring Const Group             
                                                            GC3-006         4,050                  11/09/22   11/13/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC3-007         3,435                  11/09/22   11/13/23    BETTE & CRING cONSTRUCTION GROUP    
                                                            GC3-008         5,681                  11/09/22   11/13/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC3-009         1,790                  11/09/22   11/13/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC3-010         3,485                  11/09/22   11/13/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC3-011         2,579                  11/09/22   11/13/23    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC3-012         5,898                  11/14/22   12/07/23    BETTE & CRING CONSTRUCTION CORP     
                                                            GC3-013        15,696                  01/30/23   12/20/23    BETTE & CRING CONST GROUP           
                                                            GC3-014         6,059                  01/30/23   12/20/23    BETTE & CRING CONST GROUP           
                                                            GC3-015       -17,779                  01/30/23   12/20/23    BETTE & CRING CONST GROUP           
                                                            GC3-016         9,265                  01/30/23   12/20/23    BETTE & CRING CONST GROUP           
                                                            GC3-020        24,562                  07/17/23   01/08/24    BETTE & CRING                       
                                                            GC3-021         3,519                  07/17/23   01/08/24    BETTE & CRING                       
                                                            GC3-022         6,334                  07/17/23   01/08/24    BETTE & CRING                       
                                                            GC3-023        16,646                  07/17/23   01/08/24    BETTE & CRING                       
                                                            GC3-024         6,862                  07/17/23   01/08/24    BETTE & CRING                       
                                                            GC3-025         6,480                  07/17/23   12/27/23    BETTE & CRING                       
                                                            GC3-026         8,166                  07/17/23   01/08/24    BETTE & CRING                       
                                                            GC3-027         9,827                  07/17/23   01/08/24    BETTE & CRING                       
                                                            GC3-028         3,995                  07/17/23   01/08/24    BETTE & CRING                       
                                                            MC3-002         4,277                  07/13/22   04/04/23    C&S Tech Resources Inc              
                                                            MC3-003        -5,898                  11/14/22   07/27/23    C&S TECHNICAL RESOURCES INC.        
                                                            MC3-004         2,409                  01/30/23   11/17/23    C&S TECH RESOURCES INC              
                                                            PC3-001        -2,916                  07/21/22   03/23/23    Oswego Mech Inc                     
                                                            PC3-003         5,424                  12/28/22   12/14/23    Oswego Mech Inc                     
                                                            PC3-004        33,478                  01/30/23   11/17/23    OSWEGO MECH INC                     
                                                            PC3-007         4,337                  07/17/23   12/28/23    OSWEGO MECHANICAL                   
 
20-1851   Reconstruction               0-004-012  07/16/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0775FC Reconstruction               0-004-013  01/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1241   Reconstruction               0-004-014  02/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0689FP Reconstruction               0-004-FP1  03/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Westhill Bus Garage:
91-0500   Additions and Alterations    5-005-001  12/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0895   Additions and Alterations    5-005-002  07/07/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            22,610                  01/19/05   05/12/05    J and e Electric                    
                                                            018             1,942                  06/15/05   05/05/06    J and E Electric                    
 
02-0971   Reconstruction               5-005-003  03/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0645   Reconstruction               5-005-004  05/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-035          3,614                  12/20/13   06/12/14    Huen New York, Inc.                 
                                                            GC-057              0                  03/22/13   06/17/13    BETTE & CRING LLC5100               
                                                            GC-065          6,401                  06/12/13   07/26/13    BETTE & CRING LLC                   
                                                            PC-008          5,718                  12/26/18   02/12/19    BELLUCCI ENTERPRISES INC            
                                                            PC-017          1,499                  03/22/13   02/21/14    BELLUCCI ENTERPRISES INC            
 
16-0006   Reconstruction               5-005-005  12/06/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-003          3,275                  12/11/17   02/02/18    Huen New York, Inc.                 
                                                            GC-024          7,142                  10/01/18   11/06/18    MCK BUILDING ASSOCIATES             
                                                            GC-031              0                  12/03/18   02/08/19    MCK BUILDING ASSOCIATES INC         
                                                            PC-001          2,910                  02/28/18   03/07/18    Bellucci Enterprises, Inc.          
                                                            PC-009          4,357                  02/04/19   02/25/19    BELLUCCI ENTERPRISES,INC.           
 

          Concession /Storage / Toilets:
10-0646   New Construction             7-006-001  05/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-011          1,259                  08/23/12   10/18/13    HUEN NEW YORK INC                   
                                                            EC-018          5,188                  03/22/13   02/21/14    HUEN NEW YORK INC                   
                                                            EC-031          1,727                  07/24/13   02/21/14    Huen New York Inc.                  
                                                            GC-017          3,222                  07/06/12   12/26/12    BETTE & CRING LLC                   
                                                            GC-069         12,396                  07/24/13   07/26/13    Bette & Cring LLC                   
                                                            GC-075          7,996                  08/22/13   09/13/13    Bette & Cring LLC                   
 

          Press Box @ Westhill HS:
19-1493   New Construction             7-010-001  10/14/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
15-1619   Reconstruction               7-999-001  05/10/16  NO CHANGE ORDERS ON ELECTRONIC FILE

SOLVAY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-07-02-03
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXHazard Street Mid. Sch Demo'd 2005:
93-0677   Reconstruction               0-001-002  04/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0735   Alterations                  0-001-003  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
93-0678   Reconstruction               0-006-002  04/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0043   Reconstruction               0-006-003  08/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0736   Reconstruction               0-006-004  03/14/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
01-0094   Additions and Alterations    0-006-005  04/03/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001              -550                  03/26/04   04/28/04    Joseph Flihan Co                    
                                                            002             1,653                  03/26/03   04/03/03    Airtech                             
                                                            002           -19,108                  07/16/04   07/21/04    M&N Plumbing                        
                                                            004             7,215                  02/20/03   02/26/03    Bouley Associates                   
                                                            005            25,793                  02/20/03   02/26/03    Bouley Associates                   
                                                            005                 0                  08/02/04   08/09/04    Huen New York                       
                                                            006             8,856                  02/20/03   02/26/03    Bouley Associates                   
                                                            006               471                  01/05/05   01/20/05    M&N Plumbing                        
                                                            009            18,035                  03/26/03   04/03/03    Bouley Associates                   
                                                            010            22,937                  04/14/03   04/17/03    Bouley Associates                   
                                                            011               461                  06/12/03   10/17/06    Bouley Associates                   
                                                            013            -1,326                  06/12/03   06/13/03    Bouley Associates                   
                                                            015            37,498                  08/19/03   09/16/03    Bouley Associates                   
                                                            016             8,866                  10/24/03   11/05/03    Bouley Associates                   
                                                            017             3,507                  10/24/03   11/05/03    Bouley Associates                   
                                                            018             4,535                  02/17/04   02/20/04    Bouley Associates                   
                                                            019                 0                  02/17/04   02/20/04    Bouley Associates                   
                                                            021            13,289                  02/17/04   02/20/04    Bouley Associates                   
                                                            022              -700                  02/17/04   03/03/04    Bouley Associates                   
                                                            025                 0                  02/17/04   02/20/04    Bouley Associates                   
                                                            026            11,885                  02/14/04   02/26/04    Bouley Associates                   
                                                            027             6,048           6,048  02/14/04   02/26/04    Bouley Associates                   
                                                            029            20,784                  02/14/04   03/04/04    Bouley Associates                   
                                                            031             5,102                  03/04/04   07/21/04    Bouley Associates                   
                                                            032             3,772                  03/04/04   03/17/04    Bouley Associates                   
                                                            037               134                  07/08/04   07/15/04    Bouley Associates                   
                                                            040            16,028                  07/08/04   07/15/04    Bouley Associates                   
                                                            041             1,758                  07/08/04   07/15/04    Bouley Associates                   
                                                            042             1,050                  07/08/04   07/15/04    Bouley Associates                   
                                                            C13-002       -10,170                  01/24/03   02/10/03    Bouley Associates                   
                                                            C13-014        32,404                  06/12/03   04/03/07    Bouley Associates                   
                                                            C13-046           772                  09/15/04   10/25/04    Bouley Associates                   
                                                            C13-047        -1,465                  09/15/04   10/25/04    Bouley Associates                   
                                                            C13-049        17,093                  10/04/04   10/25/04    Bouley Associates                   
                                                            C13-051         8,651                  11/03/04   11/23/04    Bouley Associates                   
                                                            C13-052           432                  11/05/04   11/23/04    Bouley Associates                   
                                                            C13-054         4,171                  01/03/05   01/10/05    Bouley Associates                   
                                                            C13-055        -2,554                  01/03/05   01/10/05    Bouley Associates                   
                                                            C13-059           280                  01/31/07   02/08/07    Bouley Associates                   
                                                            C14-006             0                  09/14/04   10/25/04    Airtech                             
                                                            C15-004           255                  10/04/04   10/25/04    M&N Plumbing                        
                                                            C16-004         2,386                  07/29/04   08/09/04    Huen New York                       
                                                            C16-009         4,221                  05/20/05   06/21/05    Huen New York                       
 
00-1295   Reconstruction               0-006-006  09/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,265                  06/06/02   08/15/02    Robert Law                          
                                                            001          -100,000                  06/27/02   07/03/02    Brosh Mech.                         
                                                            001                 0                  11/15/02   01/08/03    Edward Galvin                       
                                                            002             8,111                  11/06/02   01/07/03    Robert Law                          
                                                            002            -9,680                  11/12/02   01/02/03    Edward Galvin                       
                                                            003             6,001                  04/27/04   05/11/04    Huen New York                       
                                                            004                 0                  11/15/02   01/08/03    Robert Law                          
                                                            005             1,834                  12/30/02   01/08/03    Brosh Mech.                         
                                                            007            15,726                  12/13/02   01/09/03    Robert Law                          
                                                            008            15,214                  12/13/02   01/09/03    Robert Law                          
                                                            009             9,734                  12/13/02   01/09/03    Robert Law                          
                                                            016            13,417                  01/21/04   03/08/04    Robert Law                          
                                                            017            14,370                  01/21/04   03/08/04    Robert Law                          
                                                            018             9,683                  01/21/04   03/08/04    Robert Law                          
                                                            020            13,529                  01/21/04   03/08/04    Robert Law                          
                                                            021            61,815                  01/21/04   03/08/04    Robert Law                          
                                                            022             1,675                  07/08/04   07/19/04    Robert Law                          
                                                            08-04           3,224                  10/22/04   12/07/04    Huen New York                       
                                                            1-005               0                  12/06/02   01/02/03    Robert Law                          
                                                            1-006           8,030                  12/06/02   01/02/03    Robert Law                          
                                                            1-010           6,253                  02/19/03   04/03/03    Robert Law                          
                                                            1-013          10,137                  08/19/03   10/23/03    Robert Law                          
                                                            1-014          19,530                  08/18/03   08/27/03    Robert Law                          
                                                            1-015          10,685                  08/18/03   08/26/03    Robert Law                          
                                                            6-003          -2,950                  02/19/03   03/06/03    Edward Galvin                       
                                                            C07-004         3,279                  11/15/02   01/08/03    Brosh Mechanical                    
 
01-0206   Reconstruction               0-006-007  04/03/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             4,000                  02/11/03   02/12/03    M&N Plumbing                        
                                                            002            14,944                  06/10/03   06/13/03    Huen New York                       
                                                            002                 0                  12/29/06   01/23/07    Robert Law                          
                                                            003             4,077                  06/10/03   06/13/03    Airtech                             
                                                            003              -111                  07/06/04   07/21/04    M&N Plumbing                        
                                                            003            18,479                  07/16/04   07/21/04    Huen New York                       
                                                            005                 0                  07/13/04   07/15/04    Airtech                             
                                                            007             8,934                  02/20/03   02/26/03    Bouley Associates                   
                                                            008            16,576                  02/20/03   02/26/03    Bouley Associates                   
                                                            008            -1,859                  01/05/05   01/20/05    Air Tech                            
                                                            012                 0                  06/10/03   06/13/03    Bouley Associates                   
                                                            020                 0                  02/17/04   02/20/04    Bouley Associates                   
                                                            023            15,554                  02/17/04   04/28/04    Bouley Associates                   
                                                            024            17,115                  02/17/04   02/20/04    Bouley Associates                   
                                                            028                 0                  02/14/04   02/26/04    Bouley Associates                   
                                                            030             7,194                  03/04/04   03/17/04    Bouley Associates                   
                                                            033             3,950                  03/04/04   03/17/04    Bouley Associates                   
                                                            034            19,388          19,388  03/04/04   03/17/04    Bouley Associates                   
                                                            035            23,330                  03/26/04   04/28/04    Bouley Associates                   
                                                            038             8,254                  07/08/04   07/15/04    Bouley Associates                   
                                                            039            12,045                  07/08/04   07/15/04    Bouley Associates                   
                                                            043            25,203                  07/12/04   07/15/04    Bouley Associates                   
                                                            C13-001        35,000                  12/31/02   01/14/03    Bouley Associates                   
                                                            C13-003        -5,490                  01/24/03   02/10/03    Bouley Associates                   
                                                            C13-036             0                  03/26/04   04/28/04    Bouley Associates                   
                                                            C13-044        11,928                  09/10/04   10/01/04    Bouley Associates                   
                                                            C13-045        18,768                  09/10/04   10/01/04    Bouley Associates                   
                                                            C13-048         4,025                  09/15/04   10/25/04    Bouley Associates                   
                                                            C13-050         3,753                  11/03/04   11/23/04    Bouley Associates                   
                                                            C13-053         9,505                  11/05/04   11/23/04    Bouley Associates                   
                                                            C13-056         2,736                  01/03/05   01/10/05    Bouley Associates                   
                                                            C13-057         5,511                  01/31/07   02/08/07    Bouley Associates                   
                                                            C13-058        -9,835                  01/31/07   02/08/07    Bouley Associates                   
                                                            C13-060         1,685                  01/31/07     /  /      Bouley Associates                   
                                                            C13-061         3,469                  03/02/05   03/25/05    Bouley Associates                   
                                                            C13-062         2,591                  03/02/05   03/25/05    Bouley Associates                   
                                                            C13-063         3,927                  03/31/05   04/27/05    Bouley Associates                   
                                                            C13-064         1,113                  04/15/05   04/26/05    Bouley Associates                   
                                                            C13-60          1,685                  01/31/07   02/21/07    Bouley Associate                    
                                                            C14-001         3,980                  12/31/02   01/14/03    Airtech                             
                                                            C14-004             0                  03/05/04   04/28/04    Airtech                             
                                                            C14-007        -2,665                  11/01/04   11/23/04    AirTech                             
                                                            C14-009         1,129                  05/20/05   06/21/05    Airtech                             
                                                            C15-005           932                  11/19/04   11/23/04    M&N Plumbing                        
                                                            C16-001         1,700                  12/31/02   01/14/03    Huen New york                       
                                                            C16-006         2,495                  11/01/04   11/23/04    Huen New York                       
                                                            C16-007         8,080                  03/02/05   03/25/05    Huen New York                       
                                                            C16-008         7,757                  03/31/05   04/27/05    Huen New York                       
                                                            C16-010         5,603                  05/20/05   06/21/05    Huen New York                       
                                                            C16-011        12,906                  05/20/05   06/21/05    Huen New York                       
                                                            C17-001        48,731                  04/25/05   06/21/05    Ritter Paratore                     
                                                            C17-002        -1,105                  12/31/06   01/19/07    Ritter and Paratore                 
                                                            C18-002       -11,140                  03/31/05   04/27/05    Upstate Temp Control                
                                                            C28-001           790                  12/28/05   07/14/06    Robert Law                          
                                                            C28-003             0                  07/17/07   08/07/07    Robert Law                          
 
06-0382   Reconstruction               0-006-008  11/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0581   Reconstruction               0-006-010  05/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-01           38,600                  08/28/14   09/08/14    Patricia Electric, Inc.             
                                                            E-02                0                  08/28/14   09/08/14    Patricia Electric, Inc.             
                                                            E-03           17,342                  12/24/14   01/12/15    Patricia Electric, Inc.             
                                                            E-04            6,679                  12/24/14   01/12/15    Patricia Electric, Inc.             
                                                            E-05           15,819                  12/24/14   01/12/15    Patricia Electric, Inc.             
                                                            E-06                0                  11/25/15   01/07/16    Patricia Electric, Inc.             
                                                            E-08           -4,769                  11/25/15   01/07/16    Patricia Electric, Inc.             
                                                            GC-01           7,590                  08/25/14   09/03/14    Bellows Construction Specialities   
                                                            GC-02         -50,685                  08/25/14   09/03/14    Bellows Construction Specialities   
                                                            GC-04               0                  12/24/14   01/07/15    Bellows Construction Specialities   
                                                            GC-06         -12,750                  12/24/14     /  /      Bellows Construction Specialities   
                                                            GC-07               0                  12/24/14     /  /      Bellows Construction Specialities   
                                                            GC-09            -798                  12/24/14   01/07/15    Bellows Construction Specialities   
                                                            GC-10          11,856                  12/24/14   01/07/15    Bellows Construction Specialities   
                                                            GC-11           8,857                  12/24/14   01/12/15    Bellows Construction Specialities   
                                                            GC-12          11,357                  12/24/14   01/12/15    Bellows Construction Specialities   
                                                            GC-13          -6,600                  12/24/14   01/12/15    Bellows Construction Specialities   
                                                            KE-02          -7,580                  12/24/14   01/12/15    Joseph Filhan Co.                   
                                                            P-01            6,707                  12/24/14   01/13/15    HMI Mechanical Systems, Inc.        
                                                            P-02                0                  12/24/14   01/13/15    HMI Mechanical Systems, Inc.        
                                                            P-03           -5,409                  12/22/14   01/12/15    HMI Mechanical Systems, Inc.        
                                                            P-05            3,747                  07/31/15   08/27/15    HMI Mechanical Systems, Inc.        
                                                            R-01            6,000                  08/25/14   09/03/14    WCA Roofing & Sheet Metal Co., Inc. 
                                                            R-02          -60,000                  11/30/15   01/08/16    WCA Roofing & Sheet Metal Co., Inc. 
                                                            R-03          -36,018                  10/13/15   11/04/15    WCA Roofing & Sheet Metal Co., Inc. 
                                                            R-04           -1,118                  10/13/15   11/04/15    WCA Roofing & Sheet Metal Co, Inc.  
 
08-0392   Reconstruction               0-006-011  11/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01               0                  06/08/09   09/23/09    M.A.R.S. INC                        
                                                            E-03          -11,822                  07/26/10   09/07/10    MYRIAD CONSTRUCTION INC             
                                                            E2-01           7,530                  11/29/10   02/04/11    EDGELINE ELECTRIC CORP              
                                                            E2-02           9,942                  01/20/11   02/04/11    EDGELINE ELECTRIC CORP              
                                                            E2-03           3,909                  11/29/10   02/04/11    EDGELINE ELECTRIC CORP              
                                                            E2-04           4,397                  01/20/11   02/04/11    EDGELINE ELECTRIC CORP              
                                                            GC-03               0                  08/28/09   09/15/09    OMEGA QSE, INC.                     
                                                            GC-04               0                  08/28/09   09/15/09    OMEGA QSE, INC.                     
                                                            GC-08           7,612                  10/29/09   12/24/09    OMEGA QSE INC                       
                                                            GC-09           2,550                  01/07/10   04/23/10    OMEGA QSE INC                       
                                                            H-03            1,194                  04/21/10   07/27/10    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-05            2,346                  04/21/10   07/27/10    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-06            3,293                  07/16/10     /  /      AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-09            1,532                  07/26/10   09/07/10    AIRSIDE TECHNOLOGY CORPORATION      
                                                            M-01           30,000                  12/03/09   02/05/10    EDWARD F GALVIN INC                 
                                                            M-02            2,273                  12/03/09   02/05/10    EDWARD F GALVIN INC                 
                                                            M-03            1,319                  12/03/09   02/05/10    EDWARD F GALVIN INC                 
                                                            M-04            1,340                  01/24/11   03/18/11    EDWARD F GALVIN INC                 
                                                            P-02              220                  10/29/09   12/24/09    M&N PLUMBING AND HEATING INC        
                                                            P-03              468                  12/03/09   02/05/10    M&N PLUMBING AND HEATING INC        
                                                            P-04           -6,062                  02/18/10   07/29/10    M&N PLUMBING AND HEATING INC        
                                                            SE-01          25,052                  08/06/10   09/07/10    SECOA INC                           
                                                            SE-02           9,059                  10/07/10   10/22/10    SECOA INC                           
                                                            SE-03           4,000                  11/29/10   02/04/11    SECOA INC                           
                                                            SE-04          -1,941                  02/28/11   03/25/11    SECOA INC                           
 
14-1383   Reconstruction               0-006-012  04/10/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           1,573                  10/13/15   11/18/15    Bacon & Seiler Constructors         
                                                            GC-02           8,785                  10/09/15   11/18/15    Bacon & Seiler Constructors         
                                                            GC-03               0                  11/09/15   11/30/15    Bacon & Seiler Constructors         
                                                            GC-04               0                  11/09/15   11/30/15    Bacon & Seiler Constructors         
                                                            GC-05          -2,387                  11/09/15   11/30/15    Bacon & Seiler Constructors         
 
15-0032   Reconstruction               0-006-013  11/05/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-05           15,293                  02/03/17   02/16/17    Concord Electric Corp.              
                                                            E-06           18,661                  02/03/17   02/16/17    Concord Electric Corp.              
                                                            E-07            1,094                  05/08/17   05/10/17    Concord Electric Corp.              
                                                            E-10              369                  07/06/17   07/14/17    Concord Electric Corp.              
                                                            E-11              748                  07/06/17   07/14/17    Concord Electric Corp.              
                                                            E-12            2,327                  07/06/17   07/14/17    Concord Electric Corp.              
                                                            GC-10              60                  09/16/16     /  /      J.D. Taylor Construction Corp.      
                                                            GC-15           3,086                  09/16/16     /  /      J.D. Taylor Construction Corp.      
                                                            GC-20           7,885                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-22          12,499                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-23          10,512                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-24           1,549                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-26           5,307                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-27          12,621          12,621  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-28          -3,063                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-30          10,079                  01/30/17   02/06/17    J.D. Taylor Construction Corp.      
                                                            GC-34          -1,091                  01/30/17   02/06/17    J.D. Taylor Construction Corp.      
                                                            GC-36           6,794                  05/26/17   06/01/17    J.D. Taylor Construction Corp.      
                                                            GC-37           5,301                  05/08/17   05/09/17    J.D. Taylor Construction Corp.      
                                                            GC-39           1,555                  02/27/17   03/06/17    J.D. Taylor Construction Corp.      
                                                            GC-40           1,688                  02/27/17   03/06/17    J.D. Taylor Construction Corp.      
                                                            GC-41             756                  02/27/17   03/06/17    J.D. Taylor Construction Corp.      
                                                            GC-42           3,226                  02/27/17   03/06/17    J.D. Taylor Construction Corp.      
                                                            GC-43           1,330                  05/08/17   05/09/17    J.D. Taylor Construction Corp.      
                                                            GC-45          22,734                  05/08/17   05/09/17    J.D. Taylor Construction Corp.      
                                                            GC-46          16,483                  05/08/17   05/09/17    J.D. Taylor Construction Corp.      
                                                            H-02                0                  09/16/16   10/27/16    HMI Mechanical Systems              
                                                            H-05                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            H-06                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            H-07                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            H-08           -7,326                  07/06/17   07/14/17    HMI Mechanical Systems              
                                                            P-03                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            P-07                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            P-08                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            P-09                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            P-10                0                  05/08/17   05/10/17    HMI Mechanical Systems              
                                                            P-11           -6,371                  02/27/17   04/13/17    HMI Mechanical Systems              
                                                            P-12           -6,863                  02/27/17   04/13/17    HMI Mechanical Systems              
                                                            SW-01          85,541                  05/02/16   05/12/16    Landmark Enterprises                
                                                            SW-03               0                  09/16/16   10/26/16    Landmark Enterprises                
                                                            SW-04               0                  09/16/16   10/26/16    Landmark Enterprises                
                                                            SW-06               0                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-07               0                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-08               0                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-09               0                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-10               0                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-11               0                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-12               0                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-13            -600                  05/08/17   05/09/17    Landmark Enterprises                
                                                            SW-14         -54,105                  07/06/17   07/17/17    Landmark Enterprises                
                                                            SW-15         -12,150                  07/06/17   07/17/17    Landmark Enterprises                
 
15-1949   Reconstruction               0-006-014  07/14/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -4,657                  01/20/17   01/23/17    Bacon & Seller Constructors, Inc.   
                                                            GC-02            -504                  01/20/17   01/23/17    Bacon & Seller Constructors, Inc.   
                                                            GC-03               0                  01/20/17   01/23/17    Bacon & Seller Constructors, Inc.   
 
19-0364   Reconstruction               0-006-015  01/24/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAC-01          4,879                  11/06/20   01/25/21    SESSLER ENVIROMENTAL SERVICES       
                                                            AAC-02            980                  11/06/20   01/25/21    SESSLER ENVIROMENTAL SERVICES       
                                                            AAC-03         23,677                  11/06/20   01/25/21    SESSLER ENVIROMENTAL SERVICES       
                                                            AAC-04            595                  11/06/20   01/25/21    SESSLER ENVIROMENTAL SERVICES       
                                                            EC-01         -68,250                  08/04/21     /  /      KNAPP ELECTRIC, INC                 
                                                            EC-01         -68,250                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-02               0                  08/04/21   04/13/22    KNAPP ELECTRIC, INC                 
                                                            EC-02               0                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-03               0                  08/04/21   04/13/22    KNAPP ELECTRIC, INC                 
                                                            EC-03               0                  11/18/21   12/15/22    Knapp Electric Inc                  
                                                            EC-04          -3,784                  08/04/21     /  /      KNAPP ELECTRIC, INC                 
                                                            EC-04          -3,784                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-05               0                  08/04/21   04/13/22    KNAPP ELECTRIC, INC                 
                                                            EC-05               0                  11/18/21   12/15/22    Knapp Electric Inc                  
                                                            EC-06               0                  08/04/21   04/13/22    KNAPP ELECTRIC, INC                 
                                                            EC-06               0                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-07               0                  08/04/21   04/13/22    KNAPP EECTRIC, INC                  
                                                            EC-07               0                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-07               0                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-08               0                  11/18/21   12/15/22    Knapp Electric Inc                  
                                                            EC-09          -2,018                  11/18/21   12/15/22    Knapp Electric Inc                  
                                                            EC-10               0                  11/18/21   12/15/22    Knapp Electric Inc                  
                                                            EC-11               0                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-12               0                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-13           4,354                  11/18/21   12/15/22    Knapp Electric                      
                                                            EC-14               0                  11/18/21   12/15/22    Knapp Electric Inc                  
                                                            EC-15               0                  11/18/21   12/15/22    Knapp Electric Inc                  
                                                            EC-16               0                  11/18/21   12/15/22    Knapp Electric, Inc                 
                                                            EC-17               0                  01/25/22   01/25/23    Knapp Elec Inc                      
                                                            EC-18               0                  01/25/22   01/25/23    knapp Elec Inc                      
                                                            EC-19               0                  01/18/22   01/27/23    Knapp Elec Inc                      
                                                            EC-20         -32,128                  01/18/22   01/27/23    Knapp Elec Inc                      
                                                            GC-01               0                  11/06/20   03/08/21    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-02               0                  11/06/20   03/08/21    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-03               0                  11/06/20   03/08/21    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-04               0                  11/16/20   02/25/21    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-05               0                  11/16/20   02/25/21    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-05               0                  10/08/21   12/02/22    C&S Tech Resources, Inc             
                                                            GC-06               0                  11/16/20   02/25/21    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-07               0                  01/18/22   11/01/22    Bacon&Seller Const Inc              
                                                            GC-08               0                  01/18/22   11/01/22    Bacon& Seller Const Inc             
                                                            GC-09               0                  01/18/22   11/01/22    Bacon & Seller Const Inc            
                                                            GC-10               0                  01/18/22   11/01/22    Bacon &Seller Const Inc             
                                                            GC-11               0                  01/19/22   11/01/22    Bacon &Seller Const Inc             
                                                            GC-12               0                  01/19/22   11/01/22    Bacon&Seller Constrs Inc            
                                                            GC-36          -7,263                  03/10/22   02/22/23    Bacon&Seller Const Inc              
                                                            HVAC-01             0                  01/18/22   01/27/23    Erie Mech Contrs Inc                
                                                            HVAC-02             0                  01/18/22   01/27/23    Erie Mech Contrs Inc                
                                                            HVAC-03             0                  01/18/22   01/27/23    Erie Mech Contrs Inc                
                                                            HVAC-04        57,447                  01/18/22     /  /      Erie Mech Contrs Inc                
                                                            HVAC-06             0                  09/24/21   11/30/22    Erie Mech Contractors, Inc          
                                                            HVAC-07             0                  09/24/21   11/30/22    Erie Mech Contractors, Inc          
                                                            HVAC-08             0                  09/29/21   06/30/22    Erie Mech Contractors, Inc          
                                                            HVAC-09             0                  01/14/22   01/31/23    Erie Mech Contrs Inc                
                                                            HVAC-10       -13,199                  01/14/22   01/31/23    Erie Mech Contrs Inc                
                                                            PC-01         -20,000                  11/18/21   12/15/22    Oswego mech Inc                     
                                                            PC-02           3,748                  03/04/22   12/06/22    Oswego Mech Inc                     
 
22-0741   Reconstruction               0-006-016  12/07/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,612                  04/06/23   12/21/23    BELLOWS CONSTRUCTION SPECIALTIES    
 
22-1552   Reconstruction               0-006-017  07/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2443   Reconstruction               0-006-018  09/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1524FP Reconstruction               0-006-FP1  05/01/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Solvay Middle Schl (fmly LakelandES):
93-0679   Reconstruction               0-007-002  04/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0737   Reconstruction               0-007-003  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1212   Reconstruction               0-007-004  04/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0093   Additions and Alterations    0-007-005  03/22/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001                 0                  11/12/02   12/23/02    JD Taylor                           
                                                            001                 0                  01/05/05   01/20/05    Upstate Temperature Control         
                                                            002                 0                  03/26/03   04/03/03    Edgeline Elec.                      
                                                            003           -24,501                  01/02/03   01/10/03    JD Taylor                           
                                                            003            -2,100                  01/21/04   01/28/04    Edgeline Elec.                      
                                                            004            16,309                  02/14/04   03/04/04    Edgeline Elec.                      
                                                            005            17,551                  03/26/04   07/21/04    Edgeline Elec.                      
                                                            006              -935                  01/21/04   02/17/04    JD Taylor                           
                                                            007                 0                  02/26/04   03/17/04    JD Taylor                           
                                                            008              -435                  02/26/04   03/17/04    JD Taylor                           
                                                            009            22,812          39,632  03/05/04   11/23/04    JD Taylor                           
                                                            010            15,592                  03/05/04   03/17/04    JD Taylor                           
                                                            011            12,727                  03/05/04   03/17/04    JD Taylor                           
                                                            012             8,083                  04/29/04   05/12/04    JD Taylor                           
                                                            013             7,541                  04/29/04   05/12/04    JD Taylor                           
                                                            018             1,373                  05/28/04   07/21/04    JD Taylor                           
                                                            09-032          6,909                  12/31/04   01/10/05    JD Taylor                           
                                                            09-34           5,274                  12/31/04   01/10/05    JD Taylor                           
                                                            14              8,764                  05/28/04   07/21/04    JD Taylor                           
                                                            15             10,851                  05/28/04   07/21/04    JD Taylor                           
                                                            16              5,320                  05/28/04   07/21/04    JD Taylor                           
                                                            17              4,072                  05/28/04   07/21/04    JD Taylor                           
                                                            9-021          17,408                  09/10/04   09/17/04    JD Taylor                           
                                                            9-023          16,919                  09/10/04   09/17/04    JD Taylor                           
                                                            9-024           5,563                  09/10/04   09/17/04    JD Taylor                           
                                                            9-025          12,984          12,984  09/10/04   09/17/04    JD Taylor                           
                                                            C09-022         6,546                  11/15/04   11/23/04    JD Taylor                           
                                                            C09-027         4,931                  09/13/04   10/25/04    JD Taylor                           
                                                            C09-028        23,222          23,222  09/13/04   10/26/04    JD Taylor                           
                                                            C09-031          -744                  11/01/04   11/23/04    JD Taylor                           
                                                            C09-036         3,304                  01/31/07   02/08/07    JD Taylor                           
                                                            C09-039         6,323                  05/20/05   06/21/05    JD Taylor                           
                                                            C09-041        30,000                  05/19/06   08/08/06    Jd Taylor Construction              
                                                            C10-001             0                  09/14/04   10/25/04    Airtech                             
                                                            C10-002             0                  02/24/05   03/25/05    Air Tech                            
                                                            C10-004           506                  05/20/05   06/21/05    Airtech                             
                                                            C11-001       -30,914                  09/10/04   10/01/04    Brosh Mech.                         
                                                            C11-002             0                  09/10/04   10/01/04    Brosh Mech.                         
                                                            C11-003             0                  10/04/04   10/25/04    Brosh Mech.                         
                                                            C11-005        -5,579                  01/31/07   02/08/07    Brosh mechanical                    
                                                            C12-006        12,268                  09/14/04   10/25/04    Edgeline Elec.                      
                                                            C12-008         3,343                  11/01/04   11/23/04    Edgeline Elec.                      
                                                            C12-010           193                  01/31/07   02/08/07    Edgeline Electric                   
                                                            C12-011         2,526                  05/20/05   06/21/05    Edgeline Electric                   
                                                            C18-003       -14,792                  03/31/05   04/27/05    Upstate Temp Control                
                                                            C18-004         1,909                  05/20/05   06/21/05    Upstate Temp Control                
 
01-0173   Reconstruction               0-007-006  03/22/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001            19,820                  01/02/03   01/10/03    Edgeline Elec.                      
                                                            002            -8,059                  01/02/03   01/10/03    JD Taylor                           
                                                            004                 0                  01/22/03   02/10/03    JD Taylor                           
                                                            005                 0                  02/19/03   02/26/03    JD Taylor                           
                                                            019            12,973                  05/28/04   07/21/04    JD Taylor                           
                                                            09-33           2,329                  12/31/04   01/10/05    JD Taylor                           
                                                            09-35           1,902                  12/31/04   01/10/05    JD Taylor                           
                                                            19-02         -17,620                  01/05/05   01/20/05    Joseph Flihan Co                    
                                                            9-26           13,804                  09/10/04   10/01/04    JD Taylor                           
                                                            C09-020        11,013                  07/12/04   11/23/04    JD Taylor                           
                                                            C09-029         7,978                  10/04/04   10/25/04    JD Taylor                           
                                                            C09-030         4,826                  11/01/04   11/23/04    JD Taylor                           
                                                            C09-038           980                  03/31/05   04/27/05    JD Taylor                           
                                                            C09-040         6,751                  05/20/05   06/21/05    JD Taylor                           
                                                            C09-37          4,000                  01/31/07   02/08/07    JD Taylor                           
                                                            C10-003          -303                  02/24/05   03/25/05    Air Tech                            
                                                            C11-004             0                  10/04/04   10/25/04    Brosh Mech.                         
                                                            C12-007         3,484                  11/01/04   11/23/04    Edgeline Electriv                   
                                                            C12-009           576                  01/03/05   01/10/05    Edgeline Elec.                      
 
08-0393   Reconstruction               0-007-008  11/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002             120                  07/26/10   09/07/10    MYRIAD CONSTRUCTION INC             
                                                            GC-02               0                  08/28/09   09/15/09    OMEGA QSE, INC.                     
                                                            GC-11         -45,790                  05/06/11   05/25/11    OMEGA QSE INC                       
                                                            H-04             -139                  04/21/10   07/27/10    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-08             -120                  05/26/10   07/19/10    AIRSIDE TECHNOLOGY CORPORATION      
 
08-1594   Reconstruction               0-007-009  05/07/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,151                  07/30/10   09/14/10    CARKNER CONSTRUCTION                
 
15-0033   Reconstruction               0-007-010  11/05/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01                0                  03/25/16   04/01/16    Concord Electric Corp.              
                                                            E-02                0                  10/07/16   10/18/16    Concord Electric Corp.              
                                                            E-03                0                  10/07/16   10/18/16    Concord Electric Corp.              
                                                            E-04            2,784                  10/07/16   10/18/16    Concord Electric Corp.              
                                                            E-08            3,610                  05/08/17   05/10/17    Concord Electric Corp.              
                                                            E-09           19,617                  05/08/17   05/10/17    Concord Electric Corp.              
                                                            GC-01           2,500                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-02               0                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-03               0                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-04          -4,843                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-05               0                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-06               0                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-07               0                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-08               0                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-09               0                  07/05/16   07/27/16    J.D. Taylor Construction Corp.      
                                                            GC-11            -199                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-12               0                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-13               0                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-14               0                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-16               0                  09/16/16   10/26/16    J.D. Taylor Construction Corp.      
                                                            GC-17               0                  09/16/16   10/18/16    J.D. Taylor Construction Corp.      
                                                            GC-18          -1,011                  09/16/16   10/18/16    J.D. Taylor Construction Corp.      
                                                            GC-19           7,254                  09/16/16   10/18/16    J.D. Taylor Construction Corp.      
                                                            GC-21           3,493                  09/16/16   10/18/16    J.D. Taylor Construction Corp.      
                                                            GC-25             840                  09/16/16     /  /      J.D. Taylor Construction Corp.      
                                                            GC-29           3,335           3,335  10/03/16   10/24/16    J.D. Taylor Construction Corp.      
                                                            GC-31             656                  01/30/17   02/06/17    J.D. Taylor Construction Corp.      
                                                            GC-33           3,491                  01/30/17   02/06/17    J.D. Taylor Construction Corp.      
                                                            GC-44           1,333                  05/08/17   05/09/17    J.D. Taylor Construction Corp.      
                                                            H-01                0                  04/11/16   04/13/16    HMI Mechanical Systems              
                                                            H-01                0                  05/02/16     /  /      HMI Mechanical Systems              
                                                            P-01                0                  04/11/16   04/13/16    HMI Mechanical Systems              
                                                            P-01                0                  05/02/16   05/12/16    HMI Mechanical Systems              
                                                            P-01                0                  10/07/16     /  /      HMI Mechanical Systems              
                                                            P-02                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            P-05             -884                  02/03/17   02/16/17    HMI Mechanical Systems              
                                                            P-06                0                  01/30/17   02/16/17    HMI Mechanical Systems              
                                                            R-01                0                  04/11/16   04/13/16    WCA Roofing & Sheet Metal Co., Inc. 
                                                            R-03                0                  01/30/17   02/06/17    WCA Roofing & Sheet Metal Co., Inc. 
                                                            SW-02               0                  03/25/16   04/01/16    Landmark Enterprises                
                                                            SW-05               0                  11/07/16   11/22/16    Landmark Enterprises                
 
15-0035   Reconstruction               0-007-011  07/24/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  03/03/16   03/11/16    Bacon & Seiler Constructors, Inc.   
 
17-1786   Reconstruction               0-007-012  06/15/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         119,000                  01/24/19   02/25/19    BACON & SEILER CONSTRUCTORS         
                                                            GC-02               0                  01/15/19   02/11/19    BACON & SEILER CONSTRUCTORS         
                                                            GC-03         -18,950                  03/08/19   03/11/19    BACON & SEILER CONSTRUCTORS         
                                                            SITE-01        -2,000                  12/20/18   01/29/19    DAVIS WALLBRIDGE, INC.              
 
17-1844   Reconstruction               0-007-013  06/13/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  02/20/20   06/18/20    CONCORD ELECTRIC CORP.              
                                                            EC-02               0                  02/20/20   06/18/20    CONCORD ELECTRIC CORP.              
                                                            HVAC-01         3,000                  10/02/19   10/08/19    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-01          -3,000                  10/02/19   10/08/19    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            R-01                0                  09/11/19   09/13/19    APPLE ROOFING CORP.                 
                                                            R-02          -11,205                  11/01/19   11/08/19    APPLE ROOFING CORP.                 
                                                            R-03          -62,670                  11/01/19   11/08/19    APPLE ROOFING CORP.                 
 
18-0582   Reconstruction               0-007-014  01/10/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-02           -3,000                  12/13/19   12/26/19    KNAPP ELECTRIC, INC.                
                                                            E-05           -6,596                  12/13/19   12/26/19    KNAPP ELECTRIC, INC.                
                                                            E-06                0                  12/13/19   12/26/19    KNAPP ELECTRIC, INC.                
                                                            E-08                0                  02/18/20   06/02/20    KNAPP ELECTRIC, INC.                
                                                            E-10                0                  02/18/20   06/02/20    KNAPP ELECTRIC, INC.                
                                                            E-14                0                  06/10/20   07/08/20    KNAPP ELECTRIC, INC.                
                                                            GC-02         -13,370                  06/10/20   07/07/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-03               0                  06/10/20   07/07/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-04               0                  06/10/20   07/07/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-05               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-07               0                  06/22/20   07/24/20    07/24/20SEILER CONSTRUCTORS, INC.   
                                                            GC-08               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-10               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-16               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-17          -9,118                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-19               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-21               0                  07/13/20   08/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-22          -9,257                  07/13/20   08/24/20    BACON & SEILER CONSTRUCTION, INC.   
                                                            HC-02               0                  02/05/20   03/06/20    AIRSIDE TECHNOLOGY CORP.            
 
20-1187   Reconstruction               0-007-015  02/04/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  06/10/21   03/15/22    Construction, Design and Management 
                                                            GC-02               0                  06/10/21   03/15/22    Construction, Design, and Management
                                                            GC-03          11,422                  06/10/21   03/15/22    Construction, Design and Management 
                                                            GC-04          34,000                  07/14/21   12/30/21    Construction Design and Management  
 
21-0044   Reconstruction               0-007-016  10/02/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          -2,000                  06/09/22   04/04/23    Bellucci Entrps Inc                 
 
22-1553   Reconstruction               0-007-017  07/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0279FP Reconstruction               0-007-FP1  10/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Solvay Elementary School:
93-0680   Reconstruction               0-008-002  04/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0044   Reconstruction               0-008-003  08/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0738   Reconstruction               0-008-004  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1296   Additions and Alterations    0-008-005  09/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -3,900                  06/27/02   07/03/02    Edgeline Elec.                      
                                                            001                 0                  09/09/02   10/29/02    RJ Ortlieb                          
                                                            001                 0                  11/12/02   01/10/03    LaFrance Plumbing                   
                                                            002                 0                  07/22/02   08/16/02    Edgeline Elec.                      
                                                            002                 0                  09/20/02   10/24/02    RJ Ortlieb                          
                                                            003                 0                  11/06/02   01/07/03    RJ Ortlieb                          
                                                            003                 0                  11/12/02   01/10/03    Edgeline Elec.                      
                                                            004                 0                  11/12/02   01/10/03    Edgeline Elec.                      
                                                            004             1,382                  01/02/03   01/08/03    LaFrance Plumbing                   
                                                            005             8,320                  12/13/02   01/09/03    RJ Ortlieb                          
                                                            010             1,850                  01/24/03   02/05/03    RJ Ortlieb                          
                                                            014             3,297                  02/18/04   04/07/04    RJ Ortlieb                          
                                                            2-006           6,159                  12/24/02   01/08/02    RJ Ortlieb                          
                                                            2-007           3,428                  01/02/03   01/10/03    RJ Ortlieb                          
                                                            2-008           2,405                  01/02/03   01/10/03    RJ Ortlieb                          
                                                            2-009           6,657                  01/22/03   02/05/03    RJ Ortlieb                          
                                                            2-011           2,310                  02/20/03   04/03/03    RJ Ortlieb                          
                                                            2-012           3,973                  02/20/03   04/03/03    RJ Ortlieb                          
                                                            2-013           6,131                  02/20/03   04/03/03    RJ Ortlieb                          
                                                            2-11                0                  02/20/03     /  /      Turner Const.                       
                                                            3-001               0                  06/09/03   07/11/03    Airside Tech.                       
                                                            3-002               0                  06/09/03   07/11/03    Airside Tech.                       
                                                            3-003             637                  08/19/03   10/23/03    Airside Tech.                       
                                                            4-002               0                  12/24/02   01/08/02    LaFrance Plumbing                   
                                                            4-003               0                  12/24/02   01/08/03    LaFrance Plumbing                   
                                                            4-005             568                  06/09/03   07/11/03    LaFrance Plumbing                   
                                                            4-006           3,556                  06/09/03   07/11/03    LaFrance Plumbing                   
                                                            5-005               0                  01/22/03   02/05/03    Edgeline Elec.                      
                                                            5-006               0                  01/22/03   02/05/03    Edgeline Elec.                      
                                                            5-007           1,139                  03/26/03   04/17/03    Edgeline Elec.                      
                                                            5-008           1,295                  08/19/03   10/23/03    Edgeline Elec.                      
                                                            C02-004        11,256                  12/13/02   01/08/03    RJ Ortleib                          
 
08-0394   Reconstruction               0-008-008  11/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01               58                  07/26/10   09/07/10    MYRIAD CONSTRUCTION INC             
                                                            GC-01          12,000                  08/28/09   09/15/09    OMEGA QSE, INC.                     
                                                            GC-05           1,122                  10/07/09   10/30/09    OMEGA QSE INC                       
                                                            GC-06             400                  07/26/10   09/07/10    OMEGA QSE INC                       
                                                            GC-07           1,568                  12/03/09   02/05/10    OMEGA QSE INC                       
                                                            GC-10             266                  07/26/10   09/07/10    OMEGA QSE INC                       
                                                            H-01            1,997                  10/29/09   12/24/09    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-02              809                  04/21/10   07/27/10    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-07              -58                  05/26/10   07/19/10    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-10            5,793                  09/07/10   09/22/10    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-11          -13,353                  01/20/11   02/04/11    AIRSIDE TECHNOLOGY CORPORATION      
                                                            P-01              250                  10/07/09   10/30/09    M&N PLUMBING AND HEATING INC        
 
12-0582   Reconstruction               0-008-009  05/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-07                0                  11/25/15   12/28/15    Patricia Electric, Inc.             
                                                            GC-03               0                  08/25/14   09/03/14    Bellows Construction Specialities   
                                                            GC-05               0                  12/24/14   01/12/15    Bellows Construction Specialities   
                                                            GC-08               0                  12/24/14   01/12/15    Bellows Construction Specialities   
                                                            H-01                0                  12/04/14   12/18/14    Airside Technology Corp.            
                                                            H-02           -7,859                  12/24/14   01/12/15    Airside Technology Corp.            
                                                            KE-01               0                  12/24/14   01/13/15    Joseph Filhan Co.                   
                                                            P-04            3,222                  07/31/15     /  /      HMI Mechanical Systems, Inc.        
 
15-0034   Reconstruction               0-008-010  11/05/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-32          12,189                  01/30/17   02/06/17    J.D. Taylor Construction Corp.      
                                                            GC-35            -147                  05/26/17   06/01/17    J.D. Taylor Construction Corp.      
                                                            GC-38           2,072                  02/27/17   03/06/17    J.D. Taylor Construction Corp.      
                                                            H-04           -5,791                  10/03/16   10/18/16    HMI Mechanical Systems              
                                                            P-04             -776                  02/03/17   02/16/17    HMI Mechanical Systems              
                                                            R-02           -3,525                  09/16/16   10/27/16    WCA Roofing & Sheet Metal Co., Inc. 
                                                            R-04                0                  01/30/17   02/06/17    WCA Roofing & Sheet Metal Co., Inc. 
                                                            R-05                0                  01/30/17   02/06/17    WCA Roofing & Sheet Metal Co., Inc. 
                                                            R-06          -55,407                  02/03/17   02/21/17    WCA Roofing & Sheet Metal Co., Inc. 
 
17-1109   Reconstruction               0-008-011  03/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-01            1,910                  06/28/18   07/24/18    SIRACUSA MECHANICAL INC             
 
19-0365   Reconstruction               0-008-012  01/24/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01            -167                  07/14/21   12/16/21    Knapp Electric Inc                  
                                                            EC-02               0                  07/14/21   12/16/21    Knapp Electric Inc                  
                                                            EC-03               0                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-04               0                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-05               0                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-06               0                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-08               0                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-09               0                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-10           2,327                  10/15/21   12/05/22    Knapp Electric, Inc                 
                                                            EC-11           4,479                  01/21/22   11/15/22    Knapp Elec Inc                      
                                                            EC-12           1,562                  01/21/22   11/15/22    Knapp Elec Inc                      
                                                            EC-13             623                  01/21/22   11/15/22    Knapp Elec Inc                      
                                                            GC-01               0                  06/23/21   03/14/22    C&S Technical Resources             
                                                            GC-02               0                  06/23/21   03/14/22    C&S Technical Resources             
                                                            GC-02               0                  06/23/21   03/14/22    C&S Technical Resources Inc         
                                                            GC-03               0                  08/04/21   04/13/22    C&S TECH RESOURCES, INC             
                                                            GC-04               0                  10/08/21   07/28/22    C&S Tech Resources, Inc             
                                                            GC-06               0                  10/08/21   12/02/22    C&S Tech Resources, Inc             
                                                            GC-07               0                  10/08/21   12/02/22    C&S Tech Resources, Inc             
                                                            GC-08            -726                  10/08/21   12/02/22    C&S Tech Resources, Inc             
                                                            GC-09               0                  10/08/21   12/02/22    C&S Tech Resources, Inc             
                                                            GC-10               0                  10/08/21   12/02/22    C&S Tech Resources, Inc             
                                                            GC-11               0                  10/19/21   12/06/22    C&S Tech Resources, Inc             
                                                            GC-12               0                  10/19/21   12/06/22    C&S Tech Resources, Inc             
                                                            GC-13               0                  10/19/21   12/06/22    C&S Tech Resources, Inc             
                                                            GC-14               0                  10/19/21   12/06/22    C&S Tech Resources, Inc             
                                                            GC-15         -45,820                  10/19/21   12/06/22    C&S Tech Resources, Inc             
                                                            GC-16               0                  10/19/21   12/06/22    C&S Tech Resources, Inc             
                                                            GC-17          -2,681                  12/08/21   09/22/22    C&S Tech Resources Inc              
                                                            HVAC-01             0                  07/28/21   03/29/22    ERIE MECHANICAL CONTRACTORS, INC    
                                                            HVAC-02             0                  10/21/21   12/06/22    Erie Mech Contractors, Inc          
                                                            HVAC-03             0                  08/04/21   04/13/22    ERIE MECH CONTRACTORS, INC          
                                                            HVAC-03             0                  10/21/21   12/06/22    Erie Mech Contractors, Inc          
                                                            HVAC-04             0                  08/04/21   04/13/22    ERIE MECH CONTRACTORS, INC          
                                                            HVAC-05             0                  08/04/21   04/13/22    ERIE MECH CONTRACTORS, INC          
                                                            HVAC-06             0                  10/21/21   12/06/22    Erie mech Contractors, Inc          
                                                            HVAC-07             0                  01/14/22   01/31/23    Erie Mech Contrs Inc                
                                                            HVAC-08             0                  01/14/22   01/31/23    Erie Mech Contrs Inc                
                                                            HVAC-09       -91,312                  02/18/22   03/28/23    Erie Mech Contrs Inc                
                                                            PC-01               0                  07/28/21   03/29/22    OSWEGO MECHANICAL, INC              
                                                            PC-02               0                  09/24/21   11/30/22    Oswego Mech, Inc                    
 
18-0609   Reconstruction               0-008-013  03/29/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0666   Reconstruction               0-008-014  01/14/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0865   Reconstruction               0-008-015  03/30/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          22,000                  08/25/21   05/06/22    MCGINNIS NELSON CONSTRUCTION        
                                                            GC-02          25,200                  08/25/21   06/02/22    MCGINNIS NELSON CONSTRUCTION        
 
02-1523FP Reconstruction               0-008-FP1  05/01/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Storage Building:
18-0583   New Construction             2-014-001  01/10/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-09               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-27               0                  07/13/20   08/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            SW-08           6,732                  02/18/20   06/04/20    PAUL F. VITALE, INC.                
 

          XXSolvay Bus Garage (demo'd 04/19):
90-0675   Reconstruction               5-005-004  01/29/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0681   Reconstruction               5-005-005  04/07/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0739   Reconstruction               5-005-006  03/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0501   Reconstruction               5-005-009  12/12/14  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0354   Reconstruction               5-005-010  10/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DC-01         -22,000                  05/15/19   05/21/19    CONSTRUCTION ASSOCIATES, LLC        
 

          Bus Maintenance Facility:
18-0584   New Construction             5-013-001  01/10/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01                0                  07/30/19   07/31/19    KNAPP ELECTRIC, INC.                
                                                            E-03                0                  12/13/19   12/26/19    KNAPP ELECTRIC, INC.                
                                                            E-04                0                  12/13/19   12/26/19    KNAPP ELECTRIC, INC.                
                                                            E-07                0                  12/13/19   12/26/19    KNAPP ELECTRIC, INC.                
                                                            E-09                0                  02/18/20   06/02/20    KNAPP ELECTRIC, INC.                
                                                            E-11          -28,400                  02/18/20   06/02/20    KNAPP ELECTRIC, INC.                
                                                            E-12                0                  06/10/20   07/08/20    KNAPP ELECTRIC, INC.                
                                                            E-13                0                  06/10/20   07/08/20    KNAPP ELECTRIC, INC.                
                                                            E-15                0                  06/10/20   07/09/20    KNAPP ELECTRIC, INC.                
                                                            E-16                0                  06/10/20   07/09/20    KNAPP ELECTRIC, INC.                
                                                            E-17          -10,000                  06/10/20   07/09/20    KNAPP ELECTRIC, INC.                
                                                            E-18                0                  06/10/20   07/09/20    KNAPP ELECTRIC, INC.                
                                                            E-19                0                  06/10/20   07/09/20    KNAPP ELECTRIC, INC.                
                                                            E-20          -13,974                  06/10/20   07/09/20    KNAPP ELECTRIC, INC.                
                                                            FIC-01              0                  06/10/20   07/09/20    ORCHARD EARTH & PIPE CORP.          
                                                            FIC-02          4,553                  06/10/20   07/09/20    ORCHARD Earth & PIPE CORP.          
                                                            FIC-03          3,516                  06/10/20   07/09/20    ORCHARD EARTH & PIPE CORP.          
                                                            GC-01               0                  07/30/19   08/23/19    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-06               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-11               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-12               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-13               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-14               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-15               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-18               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-20               0                  06/22/20   07/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-23          -4,217                  07/13/20   08/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-24            -538                  07/13/20   08/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-25               0                  07/13/20   08/24/20    BACON & SEIER CONSTRUCTORS, INC.    
                                                            GC-26               0                  07/13/20   08/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            GC-28         -77,445                  07/13/20   08/24/20    BACON & SEILER CONSTRUCTORS, INC.   
                                                            HC-01               0                  02/05/20   03/06/20    AIRSIDE TECHNOLOGY CORP.            
                                                            HC-03               0                  06/10/20   07/08/20    AIRSIDE TECHNOLOGY CORP.            
                                                            HC-04         -36,275                  06/10/20   07/08/20    AIRSIDE TECHNOLOGY CORP.            
                                                            PC-01            -542                  02/11/20   03/20/20    BELLUCCI ENTERPRISES, INC.          
                                                            PC-02            -613                  02/11/20   03/20/20    BELLUCCI ENTERPRISES, INC.          
                                                            PC-03               0                  06/10/20   07/08/20    BELLUCCI ENTERPRISES, INC.          
                                                            PC-04               0                  06/10/20   07/08/20    BELLUCCI ENTERPRISES, INC.          
                                                            PC-05          -2,243                  06/10/20   07/08/20    BELLUCCI ENTERPRISES, INC.          
                                                            SW-01               0                  09/11/19   09/24/19    PAUL F. VITALE, INC.                
                                                            SW-02          -6,050                  09/11/19   09/24/19    PAUL F. VITALE, INC.                
                                                            SW-03               0                  02/05/20   03/16/20    PAUL F. VITALE, INC.                
                                                            SW-04               0                  02/05/20   03/16/20    PAUL F. VITALE, INC.                
                                                            SW-05          10,655                  12/12/19   01/02/20    PAUL F. VITALE, INC.                
                                                            SW-06           9,359                  12/12/19   01/02/20    PAUL F. VITALE, INC.                
                                                            SW-07           3,779                  02/18/20   06/04/20    PAUL F. VITALE, INC.                
                                                            SW-09           3,058                  06/10/20   08/05/20    PAUL F. VITALE, INC.                
                                                            SW-10           3,861                  06/10/20   08/05/20    PAUL F. VITALE, INC.                
                                                            SW-11           7,770                  07/01/20   07/27/20    PAUL F. VITALE, INC.                
 

          XXStorage/Concession:
97-0552   New Construction             7-009-001  12/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage/Concession:
01-0007   New Construction             7-011-001  09/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,900                  11/12/02   01/02/03    Huen of New York                    
                                                            002             6,800                  11/12/02   01/02/03    Brosh Mech.                         
                                                            002                 0                  11/15/02   01/08/03    Huen of New York                    
                                                            003            50,000                  11/06/02   01/07/03    Robert Law                          
                                                            003             5,029                  11/15/02   01/08/03    Brosh Mech.                         
                                                            019               619                  01/21/04   03/08/04    Robert Law                          
                                                            1-011           1,538                  02/19/03   04/03/03    Robert Law                          
                                                            1-012           6,551                  06/09/03   07/11/03    Robert Law                          
 

          Press Box:
01-0008   New Construction             7-012-001  09/19/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
02-0106   Reconstruction               7-999-001  12/18/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,325                  08/22/03   09/16/03    All Mode Communications             
                                                            001                 0                  03/05/04   07/21/04    LeChase Data                        
                                                            002            -5,950                  07/12/04   07/15/04    LeChase Data                        
                                                            002              -114                  01/31/07   02/08/07    All Mode Communication              
                                                            C20-003             0                  09/10/04   10/01/04    LeChase Data                        
                                                            C20-004       -23,545                  01/31/07   04/03/07    LeChase Data Telecom                
 
08-0096   Reconstruction               7-999-002  09/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01               0                  04/06/09   04/23/09    EMERALD ELECTRICAL CONTRACTORS, INC.
                                                            CO-02               0                  04/06/09   04/23/09    EMERALD ELECTRICAL CONTRACTORS, INC.
                                                            CO-03           9,573                  05/01/09   08/14/09    EMERALD ELECTRICAL CONTRACTORS INC  
 

          XXTemp Bus Garage - A P Plumbing Bld:
18-1151   Reconstruction               8-015-L01  01/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE

LAFAYETTE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-08-07-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          C. Grant Grimshaw Elementary:
91-0035   Reconstruction               0-001-004  08/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0351   Additions and Alterations    0-001-005  11/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1493   Reconstruction               0-001-006  07/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0123   Reconstruction               0-001-007  08/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0267   Reconstruction               0-001-008  09/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1620   Reconstruction               0-001-009  08/26/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2288   Additions and Alterations    0-001-010  03/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             1,430                  05/13/05   08/19/05    Patricia Electric                   
                                                            002             3,932                  12/06/05   12/09/05    Edward Galvin                       
                                                            003             4,126                  05/13/05   06/14/05    Parsons McKenna Construction        
                                                            004            19,014                  12/06/05   05/24/06    Green Plumbing                      
                                                            004             3,996                  01/19/07   03/01/07    Edward Galvin                       
                                                            005               861                  12/19/05   01/19/06    Patricia electric                   
                                                            006            -2,430                  05/13/05   06/14/05    Parsons McKenna Construction Co     
                                                            006             3,974                  12/19/05   01/17/06    Green Plumbing                      
                                                            008            -1,798                  12/19/05   01/19/06    Green Pluming                       
                                                            008             6,735                  12/19/05   01/17/06    Patricia Electric                   
                                                            009            16,688                  12/19/05   01/19/06    Green Plumbing                      
                                                            010            14,030                  12/19/05   03/01/07    Green Plumbing                      
                                                            010               886                  08/21/06   10/13/06    Patricia Electric                   
                                                            011            12,675                  12/19/05   03/01/07    Green Plumbing                      
                                                            012             2,853                  09/16/05   09/21/05    Parson McKenna Construction         
                                                            012            16,818                  12/19/05   03/01/07    Green Plumbing                      
                                                            014             3,190                  09/16/05   09/21/05    Parson McKenna Construction         
                                                            015             5,342                  09/16/05   03/01/07    Parsons McKenna Construction        
                                                            017            33,026                  12/06/05   05/24/06    Parsons Mckenna Construction        
                                                            019             3,331                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            023               949                  10/19/05   05/24/06    Parsons McKenna Construction        
                                                            026            23,100                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            029            26,105                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            030            14,002                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            032            25,141                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            033             2,908                  12/19/05   06/09/06    Parsons McKenna Construction        
                                                            034             3,000                  12/19/05   05/24/06    Parson McKenna Construction         
                                                            035             4,515                  01/19/07   03/01/07    Parsons McKenna Construction        
                                                            038                 0                  01/19/07   03/01/07    Parsons McKenna Construction        
                                                            039               768                  01/19/07   03/01/07    Parsons McKenna Construction        
 
07-1703   Reconstruction               0-001-012  05/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-AD              0                  04/18/11   05/13/11    MCK BUILDING ASSOCIATES INC         
                                                            003-AD              0                  06/18/10   08/06/10    MARCY EXCAVATION SERVICES LLC       
                                                            004             4,309                  07/16/10   08/19/10    WEYDMAN ELECTRIC INC                
                                                            007           -90,000                  03/23/11   04/22/11    MCK BUILDING ASSOCIATES INC         
                                                            011            -2,202                  04/18/11   05/13/11    MCK BUILDING ASSOCIATES INC         
                                                            GC-005         10,895                  04/19/10   07/23/10    MCK BUILDING ASSOCIATES INC         
 
08-0048   Reconstruction               0-001-013  05/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,569                  11/24/09   01/12/10    MCK BUILDING ASSOCIATES INC         
                                                            001           -22,286                  11/24/09   01/12/10    BURNS BROTHERS CONTRACTORS INC      
                                                            001           -19,557                  12/10/09   01/21/10    WEYDMAN ELECTRIC INC                
                                                            001            86,763                  12/10/09   01/25/10    MARCY EXCAVATION SERVICES LLC       
                                                            001-AD              0                  06/18/10   08/05/10    WEYDMAN ELECTRIC INC                
                                                            001-AD              0                  03/23/11   05/12/11    BURNS BROTHERS CONTRACTORS INC      
                                                            002           -13,405                  07/16/10   08/23/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            002 AD              0                  04/18/11   05/18/11    WEYDMAN ELECTRIC INC                
                                                            003             3,984                  06/18/10   08/05/10    BURNS BROTHERS CONTRACTORS INC      
                                                            003             6,999                  07/16/10     /  /      WEYDMAN ELECTRIC INC                
                                                            004            14,828                  02/08/11   05/04/11    AIRTECH HEATING & AIR CONDITIONING  
                                                            005             8,338                  02/04/11   03/03/11    BURNS BROTHERS CONTRACTORS INC      
                                                            005             1,795                  04/18/11   05/18/11    AIRTECH HEATING & AIR CONDITIONING  
                                                            005             8,338                  04/18/11   05/18/11    BURNS BROTHERS CONTRACTORS INC      
                                                            009            -3,408                  07/16/10   08/23/10    MCK BUILDING ASSOCIATES INC         
 
13-1555   Reconstruction               0-001-014  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-05          13,254                  12/09/15   01/04/16    Knapp Electric, Inc.                
                                                            EC-15           4,374                  05/23/11   05/27/16    KNAPP ELECTRIC                      
                                                            EC-16           7,028                  05/23/16   05/27/16    KNAPP ELECTRIC                      
                                                            EC-19           4,951                  07/25/16   10/06/16    Knapp Electric, Inc.                
                                                            GC-01          22,000                  07/20/15   08/05/15    Bette & Cring LLC                   
                                                            GC-05           5,730                  07/20/15   08/05/15    Bette & Cring LLC                   
                                                            GC-10           5,857                  09/02/15   09/09/15    Bette & Cring LLC                   
                                                            GC-11         118,564                  11/06/15   11/30/15    Bette & Cring LLC                   
                                                            GC-14           9,686                  12/09/15   12/23/15    Bette & Cring LLC                   
                                                            GC-15          13,238                  12/09/15   12/23/15    Bette & Cring LLC                   
                                                            GC-16           5,082                  12/09/15   12/23/15    Bette & Cring LLC                   
                                                            GC-22           3,409                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-25           3,985                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-26           5,791                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-30           6,979                  09/26/16   10/17/16    Bette & Cring, LLC                  
                                                            GT-27           5,527                  09/26/16   10/17/16    Bette & Cring, LLC                  
                                                            MC-04           5,250                  03/15/16   03/18/16    TAG Mechanical Systems, Inc.        
                                                            MC-05           5,414                  11/28/16   01/06/17    TAG MECHANICAL SYSTEMS, INC.        
                                                            PC-03           2,832                  12/09/15   12/23/15    Siracusa Mechanical, Inc.           
                                                            RC-03           8,733                  11/06/15   12/02/15    Elmer W. Davis, Inc.                
                                                            RC-04          37,106                  11/06/15   11/30/15    Elmer W. Davis, Inc.                
                                                            RC-05          46,092                  11/06/15   11/30/15    Elmer W. Davis, Inc.                
                                                            RC-06          11,042                  03/15/16   03/18/16    Elmer W. Davis, Inc.                
                                                            RC-09          18,800                  06/15/17   06/15/17    Elmer W. Davis, Inc.                
                                                            RC-10           1,414                  06/15/17   06/15/17    Elmer W. Davis,Inc.                 
                                                            RC-2           31,175                  11/06/15   11/30/15    Elmer W. Davis, Inc.                
 
17-1322   Reconstruction               0-001-015  01/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          1,629                  08/07/20   10/06/20    PATRICIA ELECTRIC, INC.             
                                                            EC-005          2,342                  08/07/20   10/07/20    PATRICIA ELECTRIC, INC.             
                                                            GC-002          8,190                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-006          2,128                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-010          6,757                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-012          9,872                  08/21/20   11/18/20    MURNANE BUILDING CONTRACTORS        
                                                            PC-003          8,998                  08/07/20   10/06/20    BROSH MECHANICAL, INC.              
                                                            PC-004         34,958                  08/07/20   10/06/20    BROSH MECHANICAL, INC.              
                                                            PC-007         10,779                  08/07/20   10/06/20    BROSH MECHANICAL, INC.              
 
18-2021   Reconstruction               0-001-016  08/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         14,490                  12/21/20   03/08/21    KNAPP ELECTRIC, INC.                
                                                            EC-004          3,222                  12/21/20   03/08/21    KNAPP ELECTRIC, INC.                
                                                            GC-002         15,044                  10/19/20   01/06/21    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-003         11,127                  10/19/20   01/06/21    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-005         19,907                  10/19/20   01/06/21    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-007         18,451                  12/21/20   03/31/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            GC-008         30,998                  12/21/20   03/31/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            GC-009         19,370                  12/21/20   03/31/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            GC-011         16,212                  12/21/20   03/01/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            GC-012          3,184                  12/21/20   03/01/21    BELLOWS CONSTRUCTION SPRCIALISTS,LLC
 
21-0403   Reconstruction               0-001-017  12/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          7,203                  02/22/23   12/04/23    RIDLEY ELEC                         
                                                            EC-003          7,810                  02/22/23   12/04/23    RIDLEY ELEC                         
                                                            GC-002         27,501                  09/27/22   12/06/23    Bette&Cring LLC                     
                                                            GC-003         11,185                  09/27/22   12/06/23    Bette&Cring LLC                     
                                                            GC-005         12,682                  02/22/23   12/14/23    BETTE & CRING LLC                   
                                                            GC-007          6,908                  02/22/23   12/14/23    BETTE & CRING LLC                   
                                                            GC-008         12,300                  02/22/23   12/14/23    BETTE & CRING LLC                   
                                                            GC-010          4,653                  02/22/23   12/14/23    BETTE & CRING LLC                   
                                                            MC-002          3,472                  02/22/23   12/04/23    C&S TECHNICAL RESOURCES INC         
                                                            MC-003         12,148                  02/22/23   12/04/23    C&S TECHNICAL SERVICES INC          
                                                            MC-004          3,740                  02/22/23   12/04/23    C&S TECHNICAL SERVICES INC          
                                                            PC-001         14,759                  09/27/22   07/18/23    Kondra & Jaquin Entrps Inc          
                                                            PC-01           4,885                  09/27/22   07/18/23    Kondra & Jaquin Entrps Inc          
 
21-0961   Reconstruction               0-001-018  10/31/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1985   Reconstruction               0-001-019  09/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
91-0036   Reconstruction               0-006-002  08/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1494   Reconstruction               0-006-003  07/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1124   Reconstruction               0-006-004  05/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1621   Additions and Alterations    0-006-005  08/26/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-5            12,843                  06/17/02   06/17/02    M&N Plumbing                        
                                                            P-2             7,046                  06/17/02   06/17/02    Green Plumbing                      
 
95-0039   Reconstruction               0-006-006  08/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0266   Reconstruction               0-006-007  09/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2289   Additions and Alterations    0-006-008  03/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001               277                  12/06/05   12/09/05    Edward Galvin                       
                                                            002            -1,698                  05/13/05   06/14/05    Parsons McKenna Construction        
                                                            003             2,852                  05/13/05   08/18/05    Green Plumbing                      
                                                            003            10,000                  12/19/05   03/01/07    Patricia Electric                   
                                                            006             1,317                  12/19/05   01/19/06    Patricia Electric                   
                                                            007                 0                  05/13/05   10/25/05    Parsons McKenna Construction Co     
                                                            009             2,377                  12/23/05   01/19/06    Patricia electric                   
                                                            010             1,948                  09/16/05   09/21/05    Parson McKenna Construction         
                                                            013             1,172                  09/16/05   09/21/05    Parsons McKenna Construction        
                                                            015               966                  01/19/07   03/01/07    Green Plumbing                      
                                                            020             1,979                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            022             1,244                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            024                 0                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            025            15,303                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            027             6,661                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            036            13,451                  02/03/06   06/09/06    Parsons McKenna Construction        
 
07-1704   Reconstruction               0-006-009  05/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            22,206                  02/24/10   04/02/10    JABLONSKI EXCAVATING INC            
                                                            001-AD              0                  04/18/11   05/18/11    JABLONSKI EXCAVATING INC            
                                                            002            11,452                  12/10/09   01/20/10    MARCY EXCAVATION SERVICES LLC       
                                                            002              -800                  02/04/11   03/02/11    JABLONSKI EXCAVATING INC            
                                                            002REV01       19,952                  07/16/10   08/18/10    MARCY EXCAVATION SERVICES LLC       
 
08-0049   Reconstruction               0-006-010  05/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -28,595                  04/19/10   08/05/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            002             7,023                  11/24/09   01/12/10    MCK BUILDING ASSOCIATES INC         
                                                            002             8,501                  06/18/10   08/05/10    WEYDMAN ELECTRIC INC                
                                                            002            -4,653                  06/18/10   08/05/10    BURNS BROTHERS CONTRACTORS INC      
                                                            002           -13,405                  07/16/10   08/23/10    AIRTECH HEATING & AIR CONDITIONING  
                                                            004          -101,286                  03/23/11   05/12/11    MCK BUILDING ASSOCIATES INC         
                                                            005            11,115                  06/16/11   06/20/11    WEYDMAN ELECTRIC INC                
                                                            008           114,019                  03/23/11   05/12/11    MCK BUILDING ASSOCIATES INC         
                                                            010             1,564                  07/16/10   08/23/10    MCK BUILDING ASSOCIATES INC         
 
13-1556   Reconstruction               0-006-012  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          26,930                  07/20/15   08/05/15    Knapp Electric, Inc.                
                                                            EC-02           5,677                  07/20/15   08/05/15    Knapp Electric, Inc.                
                                                            EC-03          17,556                  08/12/15   08/26/15    Knapp Electric, Inc.                
                                                            EC-04          13,388                  08/12/15   08/26/15    Knapp Electric, Inc.                
                                                            EC-06          11,221                  01/13/16   01/27/16    Knapp Electric, Inc.                
                                                            EC-07          12,076                  01/13/16   01/27/16    Knapp Electric, Inc.                
                                                            EC-08          35,401                  01/13/16   02/17/16    Knapp Electric, Inc.                
                                                            EC-09          22,074                  01/13/16   01/27/16    Knapp Electric, Inc.                
                                                            EC-11          14,194                  01/13/16   02/17/16    Knapp Electric, Inc.                
                                                            EC-12          22,420                  01/13/16   02/17/16    Knapp Electric, Inc.                
                                                            EC-13          18,690                  04/20/16   05/10/16    Knapp Electric, Inc.                
                                                            EC-14          13,285                  05/23/16   05/27/16    KNAPP ELECTRIC                      
                                                            EC-17           5,024                  05/23/16   05/27/16    KNAPP ELECTRIC                      
                                                            EC-18          18,570                  07/01/16   07/27/16    Knapp Electric, Inc.                
                                                            EC-21          -2,824                  11/21/16   01/06/17    Knapp Electric, Inc.                
                                                            ET-01          11,504                  03/15/16   03/18/16    Myraid Construction                 
                                                            ET-02           5,736                  05/23/16   05/27/16    MYRIAD CONSTRUCTION                 
                                                            ET-03           4,239                  05/18/16   05/27/16    MYRIAD CONSTRUCTION                 
                                                            ET-05           6,471                  09/26/16   10/17/16    Myriad Construction                 
                                                            GC-007         22,129                  08/31/15   09/03/15    Bette & Cring LLC                   
                                                            GC-008         20,480                  08/31/15   09/03/15    Bette & Cring, LLC                  
                                                            GC-009         10,249                  08/31/15   09/03/15    Bette & Cring LLC                   
                                                            GC-02          37,769                  07/20/15   08/05/15    Bette & Cring LLC                   
                                                            GC-03          19,226                  07/20/15   08/05/15    Bette & Cring LLC                   
                                                            GC-04          92,000                  07/20/15   08/05/15    Bette & Cring LLC                   
                                                            GC-06          28,628                  07/20/15   08/05/15    Bette & Cring LLC                   
                                                            GC-12          11,719                  11/06/15   02/18/16    Bette & Cring LLC                   
                                                            GC-13          14,990                  12/09/15   12/23/15    Bette & Cring LLC                   
                                                            GC-17           4,920                  01/13/16   01/27/16    Bette & Cring LLC                   
                                                            GC-19          16,596                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-20          12,452                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-21           7,337                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-23          14,054                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-24           9,155                  03/15/16   03/18/16    Bette & Cring LLC                   
                                                            GC-28          15,577                  09/26/16   10/17/16    Bette & Cring, LLC                  
                                                            GC-29           9,800                  09/26/16   10/17/16    Bette & Cring, LLC                  
                                                            GR-001          8,878                  09/26/16   10/17/16    PAC & Associates of Oswego, Inc.    
                                                            GT-01          20,200                  03/15/16   03/18/16    PAC & Associates Of Oswego Inc.     
                                                            GT-02          -1,252                  05/18/16   05/27/16    PAC & ASSOC                         
                                                            GT-03           2,438                  05/18/16   05/27/16    PAC & ASSOC                         
                                                            GT-04           7,399                  06/20/16   07/28/16    PAC & Associates of Oswego, Inc.    
                                                            MC-01          18,435                  03/15/16   03/18/16    TAG Mechanical Systems, Inc.        
                                                            MC-02          20,186                  03/15/16   03/18/16    TAG Mechanical Systems, Inc.        
                                                            MC-03           5,284                  03/15/16   03/18/16    TAG Mechanical Systems, Inc.        
                                                            MC-06          23,623                  11/28/16   01/06/17    TAG Mechanical Systems, Inc.        
                                                            PC-01          23,500                  07/20/15   08/05/15    Siracusa Mechanical, Inc.           
                                                            PC-02          12,868                  08/31/15   09/03/15    Siracusa Mechanical, Inc.           
                                                            PC-04           8,762                  12/09/15   01/04/16    Siracusa Mechanical, Inc.           
                                                            PC-05          12,946                  06/20/16   07/28/16    Siracusa Mechanical, Inc.           
                                                            PC-06          13,592                  06/20/16   07/28/16    Siracusa Mechanical, Inc.           
                                                            PC-07            -803                  07/25/16   10/06/16    Siracusa Mechanical, Inc.           
                                                            RC-01           7,761                  11/06/15   11/30/15    Elmer W. Davis, Inc.                
                                                            RC-08          10,280                  03/15/16   03/18/16    Elmer W. Davis, Inc.                
 
17-1323   Reconstruction               0-006-013  01/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         11,622                  08/07/20   10/06/20    PATRICIA ELECTRIC, INC.             
                                                            EC-003          8,873                  08/07/20   10/06/20    PATRICIA ELECTRIC, INC.             
                                                            EC-004         17,308                  08/07/20   10/06/20    PATRICIA ELECTRIC, INC.             
                                                            EC-007          7,760                  08/21/20   10/29/20    PATRICIA ELECTRIC, INC.             
                                                            EC-008         11,354                  08/21/20   10/29/20    PATRICIA ELECTRIC, INC.             
                                                            EC-009         12,327                  08/21/20   10/29/20    PATRICIA ELECTRIC, INC.             
                                                            EC-010          8,903                  08/21/20   10/29/20    PATRICIA ELECTRIC, INC.             
                                                            EC-011         13,060                  09/21/20   11/13/20    PATRICIA ELECTRIC, INC.             
                                                            EC-012         28,195                  09/21/20   11/13/20    PATRICIA ELECTRIC, INC.             
                                                            EC-013              0                  09/21/20   11/13/20    PATRICIA ELECTRIC, INC.             
                                                            GC-001           -787                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-003         10,614                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-004          9,627                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-005         13,110                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-007         24,257                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-008         10,355                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-009         10,230                  08/07/20   09/25/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-013          2,478                  08/21/20   11/18/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-014         -4,809                  08/21/20   11/18/20    MURNANE BUILDING CONTRACTORS        
                                                            MC-001          2,458                  08/21/20   10/29/20    C&S COMPANIES                       
                                                            MC-002          2,919                  08/21/20   10/29/20    C&S COMPANIES                       
                                                            MC-003            488                  08/21/20   10/29/20    C&S COMPANIES                       
                                                            PC-001          3,204                  08/07/20   10/06/20    BROSH MECHANICAL, INC.              
                                                            PC-002          5,708                  08/07/20   10/06/20    BEOSH MECHANICAL, INC.              
                                                            PC-005          1,977                  08/07/20   10/06/20    BROSH MECHANICAL, INC.              
                                                            PC-006          2,097                  08/07/20   10/06/20    BROSH MECHANICAL, INC.              
 
18-0899   Reconstruction               0-006-014  06/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0895   Reconstruction               0-006-015  05/21/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2022   Reconstruction               0-006-016  08/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002         16,436                  12/21/20   03/08/21    KNAPP ELECTRIC, INC.                
                                                            GC-001         19,013                  10/19/20   01/25/21    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-004         14,510                  10/19/20   01/06/21    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-006         71,085                  12/21/20   03/01/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
                                                            GC-010          9,625                  12/21/20   03/01/21    BELLOWS CONSTRUCTION SPECIALISTS,LLC
 
18-1865   Reconstruction               0-006-017  05/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1664   Reconstruction               0-006-018  07/10/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0404   Reconstruction               0-006-019  12/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          1,527                  02/22/23   12/04/23    RIDLEY ELECTRIC                     
                                                            GC-001         -2,632                  09/27/22   12/06/23    Bette&Cring LLC                     
                                                            GC-004          7,555                  02/22/23   12/14/23    BETTE & CRING LLC                   
                                                            GC-006         10,407                  02/22/23   12/14/23    BETTE & CRING LLC                   
                                                            GC-009          5,259                  02/22/23   12/14/23    BETTE & CRING LLC                   
                                                            MC-001          4,174                  09/27/22   07/18/23    C&S Tech Resources Inc              
                                                            PC-002        -13,216                  09/27/22   07/18/23    Kondra & Jaquin Entrps Inc          
                                                            PC-004         12,506                  02/22/23   12/04/23    KONDRA & JAQUIN ENTERPRISES INC     
 
20-1697   Reconstruction               0-006-020  06/24/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          1,887                  10/04/21   11/22/22    Gordian-Smith Site Dev              
 
21-1927   Reconstruction               0-006-021  08/03/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2409   Reconstruction               0-006-022  08/15/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sewage Treatment (was 7-011):
13-1558   Reconstruction               0-011-001  06/19/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1559   Reconstruction               0-011-002  12/19/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Storage Bldg (Snack Shack):
08-0050   New Construction             2-010-001  05/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             2,864                  02/08/11   05/04/11    AIRTECH HEATING & AIR CONDITIONING  
                                                            003             4,556                  03/23/11   05/12/11    MCK BUILDING ASSOCIATES INC         
                                                            004               815                  02/04/11   03/03/11    BURNS BROTHERS CONTRACTORS INC      
 

          Bus Garage:
02-2291   Additions and Alterations    5-002-002  03/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,515                  05/13/05   08/19/05    Patricia Electric                   
                                                            001             1,879                  05/13/05   06/10/05    Parsons McKenna Construction        
                                                            001            13,788                  05/13/05   09/09/09    Green Plumbing Inc                  
                                                            002             3,956                  05/12/05   08/19/05    Green Plumbing Inc                  
                                                            003             4,063                  12/06/05   12/09/05    Edward Galvin                       
                                                            004             1,836                  12/19/05   01/19/06    Patricia Electric                   
                                                            005             1,089                  05/13/05   08/19/05    Parsons McKenna Construction        
                                                            005            -5,000                  12/06/05   12/09/05    Green Plumbing                      
                                                            007               966                  12/19/05   01/19/06    Green Plumbing                      
                                                            007             1,962                  12/19/05   01/19/06    Patricia electric                   
                                                            008            19,670                  05/13/05   06/14/05    Parsons McKenna Construction        
                                                            011            -1,171                  09/16/05   09/21/05    Parson McKenna Construction         
                                                            011               921                  03/20/06   03/01/07    Patricia Electric                   
                                                            013            -6,001                  01/19/07   03/01/07    Green Plumbing                      
                                                            014              -350                  01/19/07   03/01/07    Green Plumbing                      
                                                            016             1,032                  09/16/05   09/21/05    Parsons Mckenna Construction        
                                                            018             6,806                  12/12/05   05/24/06    Parsons McKenna Construction        
                                                            021             4,701                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            028             1,228                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            031            10,023                  12/19/05   05/24/06    Parsons McKenna Construction        
                                                            040             7,870                  02/03/06   06/09/06    Parson McKenna Construction         
 
07-1705   Reconstruction               5-002-003  05/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006              -335                  06/18/10   08/06/10    MCK BUILDING ASSOCIATES INC         
 
13-1557   Reconstruction               5-002-004  12/19/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-020            766                  07/01/16   07/27/16    Knapp Electric, Inc.                
                                                            EC-10           3,682                  01/13/16   01/27/16    Knapp Electric, Inc.                
                                                            GC-18           2,858                  01/12/16   01/27/16    Bette & Cring LLC                   
                                                            RC-07           1,654                  03/15/16   03/18/16    Elmer W. Davis, Inc.                
 
17-1324   Reconstruction               5-002-005  01/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-006          1,679                  08/07/20   10/07/20    PATRICIA ELECTRIC, INC.             
                                                            GC-011         14,271                  08/21/20   11/18/20    MURNANE BUILDING CONTRACTORS        
 
18-2023   Reconstruction               5-002-006  08/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003           -750                  12/21/20   03/08/21    KNAPP ELECTRIC, INC.                
 
22-0105   Reconstruction               5-002-007  08/23/22  NO CHANGE ORDERS ON ELECTRONIC FILE

BALDWINSVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-09-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Harry E. Elden Elementary:
93-0995   Reconstruction               0-001-004  06/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0692   Additions and Alterations    0-001-005  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0940   Additions and Alterations    0-001-007  09/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -42,095                  06/14/06   06/23/06    Kaplan Schmidt electric             
                                                            002            -4,379                  09/05/06   10/13/06    siemens Plumbing                    
                                                            003             3,004                  12/05/05   05/24/06    Bette Cring                         
                                                            003             1,486                  12/27/06   01/19/07    LaFrance Plumbing Heating           
                                                            004           -44,640                  06/29/06   04/09/07    Airtech Heating                     
                                                            004            -5,732                  01/30/06   07/24/06    Bette Cring                         
                                                            005             3,032                  03/02/06   07/21/06    Bette Cring Construction            
                                                            007             6,649                  06/14/06   06/23/06    Bette Cring                         
 
08-0018   Reconstruction               0-001-010  11/19/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E1-003          2,682                  07/17/09   11/13/09    CELLECTRIC ELECTRICAL CORPORATION   
 
10-1240   Reconstruction               0-001-011  12/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            -1,065                  02/24/14   03/10/14    Weydman Electric                    
 
16-1605   Reconstruction               0-001-012  05/02/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0576   Reconstruction               0-001-013  03/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R2-003         28,350                  09/12/18   09/25/18    J&B INSTALLATIONS                   
 
18-1378   Reconstruction               0-001-014  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003E         2,058                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            EC-004         -6,682                  07/23/21   01/04/22    Patricia Electric Inc               
                                                            GC-003              0                  02/05/21   03/23/21    S.J. THOMAS CO., INC.               
                                                            GC-004              0                  02/05/21   03/23/21    S.J. THOMAS CO., INC.               
 
19-0973   Reconstruction               0-001-015  06/03/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,000                  06/26/23   12/29/23    MID STATE ELECTRICAL CONTRACTING    
                                                            EC2-004         2,107                  01/03/22   10/11/22    Concord Elec Corp                   
                                                            EC2-005        -2,893                  01/03/22   10/11/22    Concord Elec Corp                   
                                                            GC2-006             0                  01/03/22   12/27/22    Bette&Cring Const Group             
 

          Van Buren Elementary:
93-0996   Reconstruction               0-005-005  06/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0690   Alterations                  0-005-006  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0941   Additions and Alterations    0-005-008  09/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             6,490                  12/05/05   05/24/06    Bette Cring                         
                                                            001                 0                  09/05/06   10/13/06    siemens Building                    
                                                            004                 0                  06/14/06   10/27/06    Kaplan Schmidt electric             
                                                            008             7,257                  06/21/06   08/11/06    Bette Cring                         
                                                            H31-003             0                  06/23/06   04/09/07    Air Tech Plumbing heating           
                                                            P31-004           181                  01/11/07   01/30/07    LaFrance Plumbing heating           
 
08-0019   Reconstruction               0-005-011  11/19/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-004          3,565                  07/17/09   11/13/09    CELLECTRIC ELECTRICAL CORPORATION   
                                                            E1-005           -922                  09/01/09   09/18/09    CELLECTRIC ELECTRICAL CORPORATION   
                                                            G1-005         -3,697                  09/01/09   09/18/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GI-001            450                  04/30/09   07/21/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GI-002            450                  04/30/09   07/21/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
 
10-1241   Reconstruction               0-005-012  12/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,308                  03/06/14   05/30/14    Weydman Electric                    
                                                            003             1,074                  03/06/14   05/30/14    Weydman Electric                    
                                                            004              -613                  04/17/14   05/16/14    WEYDMAN ELECTRIC                    
                                                            006            -1,951                  01/07/13   04/05/13    MCK BUILDING ASSOCIATES INC         
 
16-1606   Reconstruction               0-005-013  05/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R3-004        -19,624                  01/03/19   02/12/19    J&B INSTALLATIONS                   
                                                            R3-006           -523                  01/28/19   03/01/19    J&B INSTALLATIONS                   
 
16-0577   Reconstruction               0-005-014  03/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R3-001        114,963                  08/13/18     /  /      PIAZZA, INC.                        
                                                            R3-001              0                  08/09/18   01/08/19    J&B INSTALLATIONS, INC.             
                                                            R3-002              0                  08/09/18   08/15/18    LECGASE CONSTRUCTION                
                                                            R3-003              0                  11/07/18   01/03/19    J&B INSTALLATIONS                   
 
18-1379   Reconstruction               0-005-015  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003D         2,058                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            GC2-001             0                  07/22/21   01/11/22    Bette & Cring Construction Group    
 
19-0974   Reconstruction               0-005-016  06/03/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-003         4,943                  01/03/22   10/11/22    Concord Elec Corp                   
                                                            GC2-001             0                  01/03/22   12/27/22    Bette&Cring Const Group             
                                                            GC2-004         1,200                  01/03/22   12/27/22    Bette&Cring Const Group             
                                                            GC2-005             0                  01/03/22   12/27/22    Bette&Cring Const Group             
                                                            GC2-007         2,818                  01/03/22   12/27/22    Bette&Cring Const Group             
                                                            HC2-001             0                  01/03/22   10/11/22    Erie Mech                           
                                                            HC2-003        -9,097                  01/03/22   10/11/22    Erie Mech                           
 

          Theo R Durgee Jr High:
97-0663   Additions and Alterations    0-006-006  03/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1054   Reconstruction               0-006-007  04/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0020   Reconstruction               0-006-010  11/19/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-002          2,197                  07/17/09   11/13/09    CELLECTRIC ELECTRICAL CORPORATION   
                                                            G1-03             235                  07/17/09   08/25/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
 
09-0685   Reconstruction               0-006-011  07/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            008            10,507                  08/01/11   11/09/11    HUEN NEW YORK                       
                                                            013                 0                  10/17/11   05/15/12    HUEN NEW YORK                       
                                                            015                 0                  07/26/12   11/20/12    King & King Architects LLP          
                                                            019            13,910                  12/12/11   07/13/12    R.J. ORTLIEB                        
                                                            020            10,374                  12/12/11   07/13/12    R.J. ORTLIEB                        
                                                            021            13,910                  12/12/11   07/13/12    R.J. ORTLIEB                        
                                                            031                 0                  07/26/12   11/20/12    King & King Architects LLP          
                                                            041                 0                  07/26/12   07/03/13    KIng & King Architects LLP          
                                                            069                 0                  03/06/13   05/31/13    R.J. ORTLIEB                        
 
14-0728   Reconstruction               0-006-012  10/22/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1A-006             0                  09/29/17   10/10/17    Billitier Electric, Inc.            
                                                            E1A-017             0                  08/09/18   02/04/19    BILLITIER ELECTRIC, INC.            
                                                            M1A-023             0                  08/09/18     /  /      ERIE MECHANICAL CONTRACTORS INC     
                                                            S1A-002        26,404                  09/20/17   10/10/17    Vitale Companies                    
 
17-1161   Reconstruction               0-006-013  12/19/18  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0578   Reconstruction               0-006-014  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1380   Reconstruction               0-006-015  04/30/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1025   Reconstruction               0-006-018  07/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  07/31/23     /  /      RJ ORTLIEB CONST CO                 
                                                            GC1-004        -7,917                  09/11/23   12/26/23    RJ ORTLIEB CONST CO.                
 
22-2475   Additions and Alterations    0-006-020  01/05/24  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1042FP Reconstruction               0-006-FP1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Charles W. Baker High School:
92-0339   Additions and Alterations    0-007-007  11/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0691   Alterations                  0-007-008  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1126   Reconstruction               0-007-009  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0664   Reconstruction               0-007-010  03/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1125   Additions and Alterations    0-007-011  01/31/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            0004            7,959                  01/13/05   02/08/05    Burns Brothers Contractors          
                                                            001             2,900                  03/09/04   04/06/04    BRG Corp                            
                                                            001            39,890                  06/07/04   06/09/04    Burns Bros.                         
                                                            001            48,834                  06/07/04   06/09/04    RC Daniel                           
                                                            001            17,267                  09/16/04   09/29/04    Siemens Building Tech.              
                                                            002            89,668                  06/07/04   06/09/04    S&D Ent.                            
                                                            002           -40,000                  06/07/04   06/09/04    RC Daniel                           
                                                            002           -10,000                  06/07/04   06/09/04    BRG Corp.                           
                                                            002            21,560                  09/16/04   09/29/04    Burns Bros.                         
                                                            002             1,998                  06/20/05   07/12/05    Siemens Plumbign Tech               
                                                            003           247,561                  06/07/04   06/09/04    Northland Assoc.                    
                                                            003             3,800                  09/16/04   09/29/04    S&D Ent.                            
                                                            003             3,500                  09/16/04   09/29/04    RC Daniels                          
                                                            003            10,365                  09/16/04   09/29/04    Burns Bros.                         
                                                            003             4,950                  04/22/05   04/26/05    BRG Corp                            
                                                            003             8,947                  06/20/05   07/12/05    Siemens Building Tech               
                                                            004            36,500                  08/19/04   09/23/04    Northland Assoc.                    
                                                            004            20,950                  04/29/05   06/10/05    RC Daniel Inc                       
                                                            004            26,635                  05/12/05   07/14/05    S and D Enterprises                 
                                                            004             1,018                  08/03/05   08/15/05    Siemens Building Technologies       
                                                            005            17,325                  08/19/04   09/23/04    Northland Assoc.                    
                                                            005             3,865                  01/20/05   03/16/05    Burns Brothers Contractors          
                                                            005            26,720                  05/12/05   07/14/05    S and D Enterprises                 
                                                            005             1,751                  08/22/05   09/02/05    RC Daniel Inc                       
                                                            005            -7,340                  01/09/06   12/18/06    Siemens Building tech               
                                                            005            -5,079                  09/05/06   10/12/06    BRG Corp                            
                                                            006           126,606                  12/10/04   12/23/04    Northland Assoc.                    
                                                            006             4,211                  01/20/05   03/16/05    Burns Brothers Contractors          
                                                            006             3,600                  05/12/05   07/14/05    S and D Enterprises                 
                                                            006             9,097                  10/05/05   10/13/05    RC Daniel IOnc                      
                                                            006              -775                  12/27/05   08/08/06    BRG Corp                            
                                                            007            10,248                  01/13/05   02/08/05    Northland Associates                
                                                            007             6,154                  03/04/05   03/24/05    Burns Brothers Contractors          
                                                            007             9,114                  05/12/05   07/14/05    S and D Enteprises                  
                                                            007             9,237                  10/23/06   12/18/06    RC Daniels                          
                                                            008            18,539                  01/13/05   02/08/05    Northland Associates                
                                                            008             4,324                  03/04/05   03/24/05    Burns Brothers Contractors          
                                                            008             8,960                  05/26/05   07/20/05    S and D Enterprises                 
                                                            008             6,875                  04/03/06   04/20/06    RC Daniel Inc                       
                                                            009             7,898                  01/28/05   03/02/05    Northland Associates                
                                                            009               124                  04/08/05   06/21/05    Burns Brothers Contractors          
                                                            009             2,654                  06/20/05   07/12/05    Sand D Enterprises                  
                                                            010             6,498                  04/22/05   04/26/05    Burns Brothers Contractors          
                                                            010            34,577                  05/26/05   07/20/05    Northland Associates                
                                                            010             6,322                  06/22/05   07/12/05    Sand D enteprises                   
                                                            011             4,460                  04/08/05   06/21/05    Northland Associates                
                                                            011               311                  06/20/05   07/20/05    Burns Borthers Contractors          
                                                            011             5,150                  07/01/05   07/19/05    S and D Enteprises                  
                                                            012             7,106                  04/08/05   06/21/05    Northland Associates                
                                                            012             1,265                  06/22/05   07/12/05    Burns Borthers Contractors          
                                                            012              -937                  09/28/05   10/13/05    S and D Enterprises                 
                                                            013             3,899                  04/22/05   04/26/05    Northland Associates                
                                                            013             3,585                  10/05/05   10/13/05    S & D Enterprises                   
                                                            013             4,758                  10/20/05   12/18/06    Burns Brothers                      
                                                            014             9,047                  05/26/05   07/20/05    Northland Associates                
                                                            014             3,500                  12/27/05   04/21/06    S and D Enterprises                 
                                                            014               542                  01/03/05   12/18/06    Burns Brothers                      
                                                            015             5,040                  05/26/05   07/20/05    Northland Assocates                 
                                                            015            -1,475                  04/03/06   04/20/06    S and D Enterprises                 
                                                            016           -27,709                  10/23/06   12/18/06    Northland Assoicates                
                                                            017             8,343                  08/22/05   09/02/05    Northland Associates                
                                                            018             1,259                  08/03/05   08/15/05    northland Associates                
                                                            019               892                  09/09/05   12/18/06    NORTHLAND ASSOCIATES                
                                                            020             9,015                  10/04/05   12/18/06    Northland Associates                
                                                            021             6,179                  09/27/05   10/13/05    Northland Associates                
                                                            022             4,485                  10/04/05   10/13/05    Northland Associates                
                                                            023              -310                  01/09/06   06/26/06    Northland Associates                
                                                            024             7,256                  12/08/05   12/18/06    NORHTLAND ASSOCIATES                
                                                            025             1,575                  12/27/05   08/08/06    Northland Associates                
                                                            026             1,268                  12/27/05   08/08/06    Northland Associates                
                                                            GC-21          21,346                  03/19/04   04/07/04    Northland Assoc.                    
                                                            GC-21-2       166,552                  05/10/04   05/13/04    Northland Assoc.                    
                                                            H-21-1        119,857                  05/10/04   05/13/04    S&D Ent.                            
                                                            W21-17        -15,000                  11/04/05   11/21/05    BRG CORPORATION                     
 
05-0312   Reconstruction               0-007-013  02/16/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,820                  08/01/06   08/14/06    John Palmer                         
                                                            001                 0                  05/03/07   05/15/07    Myriad Construction                 
                                                            001            25,278                  10/05/07   11/07/07    PARAGON ENVIRONMENTAL CONSTRUCTION, 
                                                            002                 0                  11/17/06   01/09/07    John Fisher Construction            
                                                            002                 0                  03/02/07   03/13/07    Apple Roofing Corp                  
                                                            002                 0                  03/02/07   03/13/07    Edward Joy Co                       
                                                            002           -16,400                  10/05/07   11/07/07    PARAGPN ENVIRONMENTAL CONSTRUCTION, 
                                                            006                 0                  03/22/07   04/03/07    RJ ortleib construction             
                                                            S-1             1,667                  10/05/07   11/07/07    JOHN E. FISHER CONSTRUCTION COMPANY 
                                                            S2-002         -1,200                  12/01/08   05/19/09    BOLAND'S EXCAVATING AND TOPSOIL, INC
                                                            S2-1           -9,365                  02/07/08   03/08/08    BOLANDS EXCAVATING AND TOPSOIL, INC 
 
09-0686   Additions and Alterations    0-007-014  07/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001            19,516                  05/05/11   05/25/11    HUEN NEW YORK                       
                                                            001            16,505                  01/19/12   04/12/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            001                 0                  07/26/12   08/12/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            002            13,146                  05/05/11   05/25/11    R.J. ORTLIEB                        
                                                            002            12,792                  05/05/11   05/25/11    HUEN NEW YORK                       
                                                            002            29,713                  10/31/11   05/15/12    BURNS BROS CONTRACTORS              
                                                            002            19,254                  01/19/12   04/12/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            002            29,662                  02/19/13   01/31/14    AIRSIDE TECHNOLOGY CORPORATION      
                                                            003           -48,989                  05/05/11   05/25/11    HUEN NEW YORK                       
                                                            003            12,272                  06/27/11   07/15/11    R.J. ORTLIEB                        
                                                            003             6,690                  01/19/12   04/06/12    BURNS BROS CONTRACTORS              
                                                            003            19,254                  02/03/12   07/16/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            003                 0                  01/23/13   08/23/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            004                 0                  01/19/12   04/12/12    BURNS BROS CONTRACTORS              
                                                            004                 0                  09/16/13   02/03/14    Airside Technology Corporation      
                                                            004-074        16,317                  05/06/13   06/28/13    R. J. Ortlieb                       
                                                            004-075        16,582                  05/06/13   06/28/13    R. J. Ortlieb                       
                                                            005            12,202                  06/27/11   07/15/11    R.J. ORTLIEB                        
                                                            005             9,994                  10/17/11   05/14/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            005                 0                  01/19/12   04/06/12    BURNS BROS CONTRACTORS              
                                                            006            11,678                  06/27/11   07/15/11    R.J. ORTLIEB                        
                                                            006             6,783                  10/17/11   05/14/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            006                 0                  01/19/12   11/13/14    BURNS BROS CONTRACTORS              
                                                            006                 0                  03/06/14   05/30/14    Airside Technology Corporation      
                                                            006 005             0                  02/24/14   03/10/14    Airside Technology Corporation      
                                                            007            12,983                  06/27/11   07/15/11    R.J. ORTLIEB                        
                                                            007            -3,441                  08/01/11   11/09/11    HUEN NEW YORK                       
                                                            007             6,783                  10/17/11   05/14/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            007              -239                  03/06/14   05/30/14    Airside Technology Corporation      
                                                            008             6,783                  10/17/11   05/14/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            008            15,561                  10/19/11   12/12/11    R.J. ORTLIEB                        
                                                            009             4,967                  08/01/11   11/09/11    HUEN NEW YORK INC                   
                                                            009                 0                  10/19/11   12/12/11    R.J. ORTLIEB                        
                                                            009            14,380                  01/19/12   04/12/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            009             4,201                  03/05/12   08/29/12    BURNS BROS CONTRACTORS              
                                                            010             4,967                  08/01/11   11/09/11    HUEN NEW YORK INC                   
                                                            010                 0                  10/19/11   12/12/11    R.J. ORTLIEB                        
                                                            010            11,077                  01/19/12   10/24/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            010             3,772                  03/05/12   08/29/12    BURNS BROS CONTRACTORS              
                                                            011             4,967                  08/01/11   11/09/11    HUEN NEW YORK                       
                                                            011                 0                  10/19/11   12/12/11    R.J. ORTLIEB                        
                                                            011                 0                  01/19/12   04/12/12    AIRSIDE TECHNOLOGY CORPORATION      
                                                            011             4,803                  03/05/12   08/29/12    BURNS BROS CONTRACTORS              
                                                            012                 0                  10/17/11   05/14/12    HUEN NEW YORK                       
                                                            012                 0                  10/19/11   12/12/11    R.J. ORTLIEB                        
                                                            012            18,132                  04/18/12   01/31/14    AIRSIDE TECHNOLOGY CORPORATION      
                                                            013                 0                  10/19/11   12/12/11    R.J. ORTLIEB                        
                                                            013            20,395                  04/18/12   01/31/14    AIRSIDE TECHNOLOGY CORPORATION      
                                                            014                 0                  07/26/12   11/05/12    King & King, Architects LLP         
                                                            014                 0                  07/26/12   07/29/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            015            24,689                  10/17/11   12/12/11    R.J. ORTLIEB                        
                                                            015            -1,569                  01/07/13   07/16/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            016            21,983                  10/17/11   05/15/12    HUEN NEW YORK                       
                                                            016             7,719                  10/17/11   12/12/11    R.J. ORTLIEB                        
                                                            016            -1,542                  01/07/13   07/16/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            016             3,127                  01/07/13   10/11/13    BURNS BROS CONTRACTORS              
                                                            017            10,156                  10/17/11   12/12/11    R.J. ORTLIEB                        
                                                            017                 0                  01/10/13   07/16/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            018            -3,291                  10/17/11   05/15/12    HUEN NEW YORK                       
                                                            018                 0                  05/01/13   12/18/13    Airside Technology Coproration      
                                                            018                 0                  06/20/13   07/16/13    Burns Bros Constractors             
                                                            019          -140,472                  04/25/13   07/16/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            019            -1,798                  02/24/14   03/10/14    Burns Bros Contractors              
                                                            020            -1,554                  02/24/14   03/10/14    Burns Bros Contractors              
                                                            021                 0                  01/19/12   04/12/12    HUEN NEW YORK                       
                                                            024                 0                  01/19/12   04/11/12    R.J. ORTLIEB                        
                                                            024             2,117                  03/05/12   08/29/12    HUEN NEW YORK                       
                                                            025           -39,344                  03/05/12   08/30/12    R.J. ORTLIEB                        
                                                            025            14,177                  05/18/12   07/03/13    HUEN NEW YORK                       
                                                            026            18,516                  04/18/12   08/30/12    R.J. ORTLIEB                        
                                                            026            23,919                  05/18/12   07/03/13    HUEN NEW YORK                       
                                                            027            17,625                  06/11/12   09/12/12    Huen New York                       
                                                            027             9,404                  03/05/12   08/30/12    R.J. ORTLIEB                        
                                                            028            17,450                  06/11/12   09/12/12    Huen New York                       
                                                            028             9,680                  03/05/12   08/06/12    R.J. ORTLIEB                        
                                                            029             9,867                  03/05/12   08/06/12    R.J. ORTLIEB                        
                                                            030                 0                  07/26/12   07/29/13    HUEN NEW YORK                       
                                                            031             9,098                  03/05/12   08/06/12    R.J. ORTLIEB                        
                                                            033              -516                  03/05/12   08/06/12    R.J. ORTLIEB                        
                                                            033                 0                  07/26/12   01/24/13    HUEN NEW YORK                       
                                                            035             5,331                  03/05/12   08/06/12    R.J. ORTLIEB                        
                                                            036             2,321                  03/05/12   08/06/12    R.J. ORTLIEB                        
                                                            036                 0                  01/07/13   10/11/13    HUEN NEW YORK                       
                                                            037            14,919                  05/07/12   09/14/12    R.J. ORTLIEB                        
                                                            037                 0                  01/07/13   10/11/13    HUEN NEW YORK                       
                                                            038            35,754                  05/07/12   09/14/12    R.J. ORTLIEB                        
                                                            039              -536                  04/18/12     /  /      R.J. ORTLIEB                        
                                                            040                 0                  07/26/12   02/19/13    R.J. ORTLIEB                        
                                                            040                 0                  03/06/13   09/19/13    HUEN NEW YORK                       
                                                            041                 0                  03/06/13   07/16/13    HUEN NEW YORK                       
                                                            042                 0                  03/06/13   07/16/13    HUEN NEW YORK                       
                                                            043                 0                  07/26/12   02/19/13    R.J. ORTLIEB                        
                                                            044                 0                  07/26/12   02/19/13    R.J. ORTLIEB                        
                                                            045                 0                  07/26/12   02/19/13    R.J. ORTLIEB                        
                                                            045                 0                  06/20/13     /  /      Huen New York                       
                                                            046            27,200                  09/06/12   12/20/12    R.J. ORTLIEB                        
                                                            046                 0                  09/16/13   11/26/13    Huen New York                       
                                                            047            36,383                  09/06/12   12/20/12    R.J. ORTLIEB                        
                                                            048             2,625                  08/22/12   12/10/12    R.J. ORTLIEB                        
                                                            048            -5,000                  02/24/14   03/21/14    Huen New York                       
                                                            049           -35,000                  02/24/14   03/10/14    Huen New York                       
                                                            050            12,474                  09/19/12   01/04/13    R.J. ORTLIEB                        
                                                            050                 0                  05/09/14   05/21/14    Huen New York                       
                                                            051                 0                  05/09/14   05/21/14    Huen New York                       
                                                            052           -18,516                  01/23/13   11/22/13    R.J. ORTLIEB                        
                                                            052                 0                  05/09/14   05/21/14    Huen New York                       
                                                            053                 0                  12/03/12   02/22/13    R.J.ORTLIEB                         
                                                            053           -43,006                  05/09/14   05/21/14    Huen New York                       
                                                            054                 0                  12/03/12   04/05/13    rj ortlieb                          
                                                            055                 0                  12/03/12   04/05/13    rj ortlieb                          
                                                            056                 0                  12/03/12   04/05/13    rj ortlieb                          
                                                            057                 0                  12/03/12   04/05/13    rj ortlieb                          
                                                            058                 0                  12/03/12   04/05/13    rj ortlieb                          
                                                            059             5,247                  01/10/13   03/26/13    R.J. ORTLIEB                        
                                                            060             6,344                  01/10/13   03/26/13    R.J. ORTLIEB                        
                                                            061            12,365                  02/19/13   05/08/13    R.J. ORTLIEB                        
                                                            063                 0                  03/06/13   05/31/13    R.J. ORTLIEB                        
                                                            064                 0                  03/06/13   05/31/13    R.J. ORTLIEB                        
                                                            065                 0                  03/06/13   05/31/13    R.J. ORTLIEB                        
                                                            070             7,290                  04/10/13   06/28/13    R.J. ORTLIEB                        
                                                            071             9,587                  04/10/13   11/25/13    R.J. ORTLIEB                        
                                                            076                 0                  04/23/14   05/02/14    R.J. Ortlieb                        
                                                            077                 0                  04/23/14   05/02/14    R.J. Orlieb                         
                                                            078                 0                  04/23/14   05/02/14    R.J. Ortlieb                        
                                                            079            29,585                  09/23/13   11/26/13    R.J. Ortlieb                        
                                                            080            37,154                  09/23/13   11/26/13    R.J. Ortlieb                        
                                                            081            13,072                  09/23/13   11/26/13    R.J. Ortlieb                        
                                                            082                 0                  04/28/14   07/03/14    R.J. Ortlieb                        
                                                            083                 0                  02/24/14   03/10/14    R.J. Ortlieb                        
                                                            084                 0                  02/24/14   03/10/14    R.J. Ortlieb                        
                                                            085            -5,829                  05/09/14   05/21/14    R.J. Ortlieb, Inc.                  
                                                            086           -16,787                  04/17/14   05/16/14    R.J. ORTLIEB                        
                                                            E1A-010       121,160                  08/02/17     /  /      Billitier Electric, Inc.            
 
08-0021   Reconstruction               0-007-015  11/19/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-001            634                  07/17/09   11/13/09    CELLECTRIC ELECTRICAL CORPORATION   
                                                            G1-004              0                  07/27/09   08/05/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
 
14-0729SR Reconstruction               0-007-016  01/26/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0983   Reconstruction               0-007-016  10/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            28,257                  10/26/15   11/19/15    R.J. Ortlieb                        
                                                            001           -15,527                  03/07/16   03/11/16    Myraid Construction, Inc.           
                                                            001              -387                  03/07/16   03/11/16    Airside Technology Corporation      
                                                            001            73,000                  08/31/16   10/04/16    Erie Mechanical                     
                                                            002            36,852                  02/08/16   02/12/16    R.J. Ortlieb                        
                                                            003            28,350                  04/07/16   04/18/16    R.J. Ortlieb                        
                                                            004            38,850                  04/07/16   04/18/16    R.J. Ortlieb                        
                                                            005             6,972                  03/10/16   03/18/16    R.J. Ortlieb                        
                                                            006           -10,000                  03/07/16   03/11/16    R.J. Ortlieb                        
                                                            7                -415                  03/07/16   03/11/16    R.J. Ortlieb                        
                                                            E1A-003             0                  09/29/17   10/10/17    Billitier Electric                  
                                                            E1A-004             0                  09/29/17   10/10/17    Billitier Electric                  
                                                            E1A-007             0                  09/29/17   10/10/17    Billitier Electric, Inc.            
                                                            E1A-008             0                  09/29/17   10/10/17    Billitier Electric, Inc.            
                                                            E1A-009        17,480                  10/23/17   11/06/17    Billitier Electric, Inc.            
                                                            E1A-011             0                  08/17/17   09/07/17    Billitier Electric, Inc.            
                                                            E1A-012             0                  09/29/17   10/10/17    Billitier Electric, Inc.            
                                                            E1A-013         4,029                  08/17/17   09/07/17    Billitier Electric, Inc.            
                                                            E1A-014             0                  08/17/17   09/07/17    Billitier Electric, Inc.            
                                                            E1A-016             0                  08/15/18   01/04/19    BILLITIER ELECTRIC, INC.            
                                                            E1A-019          -965                  08/09/18   01/04/19    BILLITER ELECTRIC, INC.             
                                                            G-1A           13,682                  08/15/18   01/03/19    PAC & ASSOCIATES OF OSWEGO INC.     
                                                            G1A-001             0                  06/30/17   09/07/17    PAC Construction                    
                                                            G1A-001             0                  08/17/17     /  /      Vitale Companies                    
                                                            G1A-002             0                  06/30/17   07/05/17    PAC Construction                    
                                                            G1A-003             0                  06/30/17   07/05/17    PAC Construction                    
                                                            G1A-005             0                  06/30/17   07/05/17    PAC Construction                    
                                                            G1A-006             0                  06/30/17   07/14/17    PAC Construction                    
                                                            G1A-007             0                  06/30/17   07/05/17    PAC Construction                    
                                                            G1A-008             0                  06/30/17   07/05/17    PAC Construction                    
                                                            G1A-011        24,090                  08/28/17   09/06/17    PAC Construction                    
                                                            G1A-013             0                  08/17/17   09/07/17    PAC Construction                    
                                                            G1A-014        34,704                  08/28/17   09/06/17    PAC & Associates of Oswego Inc.     
                                                            G1A-015             0                  08/17/17   09/07/17    PAC & Associates of Oswego Inc.     
                                                            G1A-016             0                  06/30/17   07/14/17    PAC & Associates of Oswego Inc.     
                                                            G1A-017             0                  08/17/17   09/07/17    PAC & Associates of Oswego Inc.     
                                                            G1A-018             0                  08/17/17   09/07/17    PAC & Associates of Oswego Inc.     
                                                            G1A-019             0                  08/17/17   09/07/17    PAC & Associates of Oswego Inc.     
                                                            G1A-020       -78,000                  09/20/17   10/10/17    PAC & Associates of Oswego Inc.     
                                                            G1A-021             0                  06/30/17   07/05/17    PAC & Associates of Oswego Inc.     
                                                            G1A-022             0                  06/30/17   07/05/17    PAC & Associates of Oswego Inc.     
                                                            G1A-023             0                  06/30/17   09/06/17    PAC & Associates of Oswego, Inc.    
                                                            G1A-024             0                  06/30/17   07/05/17    PAC & Associates of Oswego, Inc.    
                                                            G1A-025         3,900                  06/30/17   07/05/17    PAC & Associates of Oswego, Inc.    
                                                            G1A-026             0                  06/30/17   07/05/17    PAC & Associates of Oswego, Inc.    
                                                            G1A-027         1,794                  07/20/17   07/27/17    PAC & Associates of Oswego, Inc.    
                                                            G1A-030             0                  08/09/18   03/11/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-031             0                  08/09/18   03/11/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-032         9,062                  08/09/18   12/28/18    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-033        10,170                  08/09/18   12/28/18    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-034         1,129                  08/09/18   12/28/18    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-035         3,959                  08/09/18   12/28/18    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-036         2,323           2,323  08/09/18   12/28/18    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-037         2,115                  08/15/18   01/03/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-038         1,065                  08/15/18   01/03/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-039         2,466                  08/15/18   01/03/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-040         1,065                  08/15/18   01/03/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-041         7,763                  08/15/18   01/03/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-042        13,682                  08/15/18     /  /      PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-045             0                  08/09/18   03/11/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-046        13,264                  08/09/18   03/11/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-047             0                  08/09/18   03/11/19    PAC & ASSOCIATES OF OSWEGO INC.     
                                                            G1A-049       -37,386                  09/20/18   11/09/18    LECHASE CONSTRUCTION                
                                                            M1A-001        73,000                  08/28/17   09/06/17    Erie Mechanical                     
                                                            M1A-002             0                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-003             0                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-005             0                  08/17/17   09/07/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-006        29,223                  06/28/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-009        24,554                  06/28/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-011        11,712                  08/28/17   09/06/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-012         6,056                  06/28/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-014             0                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-015             0                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-017             0                  08/17/17   09/07/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-018             0                  08/17/17   09/07/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-021         6,918                  08/09/18   01/03/19    ERIE MECHANICAL CONTRACTORS         
                                                            M1A-024        -5,671                  08/09/18   01/03/19    ERIE MECHANICAL CONTRACTORS         
                                                            P1A-001             0                  08/17/17   09/07/17    Erie Mechanical                     
                                                            P1A-002             0                  08/17/17   09/07/17    Erie Mechanical                     
                                                            P1A-003        11,647                  07/20/17   09/06/17    Erie Mechanical                     
                                                            P1A-005        -4,359                  08/09/18   01/07/19    Erie mechanical Contractors         
                                                            SC-01           1,046                  07/11/18   01/03/19    PATRICIA ELECTRIC INC.              
                                                            T1A-001        20,900                  07/20/17   09/06/17    BMI Supply                          
                                                            T1A-002        14,500                  07/20/17   09/06/17    BMI Supply                          
                                                            T1A-003         7,400                  07/20/17   09/06/17    BMI Supply                          
                                                            T1A-004             0                  07/20/17   09/06/17    BMI Supply                          
                                                            T1A-005             0                  07/20/17   09/06/17    BMI Supply                          
                                                            T1A-006        -3,900                  08/17/17   09/07/17    BMI Supply                          
                                                            T1A-007             0                  07/20/17   09/06/17    BMI Supply                          
                                                            T1A-008             0                  07/20/17   07/27/17    BMI Supply                          
                                                            T1A-009             0                  08/09/18   03/11/19    BMI SUPPLY                          
                                                            T1A-010        -3,306                  08/09/18   02/04/19    BMI SUPPLY                          
                                                            T1A-011       -33,930                  09/12/18   11/09/18    LECHASE CONSTRUCTION                
 
14-1159   Reconstruction               0-007-017  08/10/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            002           267,000                  05/02/16   07/07/16    Ridley Electric Co, Inc.            
                                                            002            14,754                  08/31/16     /  /      Raymond E. Kelley, Inc.             
                                                            002            13,329                  07/05/16   08/04/16    Robert H. Law Inc.                  
                                                            003            22,239                  08/24/16   12/28/16    Robert H. Law Inc.                  
                                                            004            12,157                  08/24/16   12/28/16    Ridley Electric Co, Inc.            
                                                            005            18,408                  08/24/16   12/28/16    Ridley Electric Co, Inc.            
                                                            006            15,027                  08/24/16   12/28/16    Ridley Electric Co, Inc.            
                                                            007            20,441                  08/24/16   12/28/16    Ridley Electric Co, Inc.            
                                                            2              13,229                  06/28/16   07/29/16    Robert H. Law Inc.                  
                                                            G2-001              0                  08/17/17   09/07/17    R.J. Ortlieb Construction Co.       
                                                            G2-003         -2,200                  08/17/17   09/07/17    R.J. Ortlieb Construction Corp.     
                                                            MR2-003             0                  08/17/17   09/07/17    R. E. Kelley                        
                                                            MR2-004             0                  08/17/17   09/07/17    R. E. Kelley                        
                                                            MR2-005             0                  08/17/17   09/07/17    R. E. Kelley                        
                                                            MR2-006             0                  08/17/17   09/07/17    R.E. Kelley                         
                                                            MR2-007             0                  08/17/17   09/07/17    R.E. Kelley                         
                                                            MR2-008             0                  08/17/17   09/07/17    R.E. Kelley                         
 
14-0727   Reconstruction               0-007-018  01/23/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-002       -61,506                  05/26/17   06/01/17    Diamond Roofing Co., Inc.           
                                                            RC-001        325,000                  05/05/16   05/19/16    DIAMOND ROOFING                     
 
17-1162   Reconstruction               0-007-019  12/19/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E3A-001        -3,142                  09/26/19   09/30/19    PATRICIA ELECTRIC                   
                                                            E3A-002             0                  07/01/20   07/27/20    ERIE MECHANICAL CONTRACTORS         
                                                            E3A-003             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-004             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-005             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-006         5,669                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-007         3,400                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-009             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-010        18,872                  07/01/20   07/27/20    PATRICIA ELECTRIC                   
                                                            E3A-011             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-012             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-013             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-014         8,334                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-015             0                  06/12/20   07/17/20    PATRICIA ELECTRIC                   
                                                            E3A-016         2,453                  01/15/21   03/17/21    PATRICIA ELECTRIC                   
                                                            E3A-018          -654                  01/15/21   03/17/21    PATRICIA ELECTRIC                   
                                                            F3A-001        -5,150                  06/12/20   07/14/20    MAIN FORD GENERAL SUPPLY            
                                                            F3A-002             0                  06/12/20   07/14/20    MAIN FORD GENERAL SUPPLY            
                                                            F3A-004       -23,504                  01/15/21   05/25/21    MAIN FORD GENERAL SUPPLY            
                                                            G3A-001             0                  07/22/19   07/23/19    SJ THOMAS CO.,INC.                  
                                                            G3A-002        63,000                  10/16/19   10/31/19    SJ THOMAS CO.,INC.                  
                                                            G3A-003             0                  09/26/19   10/21/19    SJ THOMAS CO.,INC.                  
                                                            G3A-004             0                  09/26/19   10/21/19    SJ THOMAS CO.,INC.                  
                                                            G3A-005             0                  10/16/19   10/31/19    SJ THOMAS CO.,INC.                  
                                                            G3A-006             0                  09/26/19   10/21/19    SJ THOMAS CO.,INC.                  
                                                            G3A-007        -2,146                  09/25/19   09/26/19    SJ THOMAS CO.,INC.                  
                                                            G3A-008             0                  11/15/19   12/04/19    SJ THOMAS CO.,INC.                  
                                                            G3A-009        -2,680                  11/15/19   12/04/19    SJ THOMAS CO.,INC.                  
                                                            G3A-010             0                  11/15/19   12/04/19    SJ THOMAS CO.,INC.                  
                                                            G3A-013             0                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-014             0                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-015             0                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-016             0                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-017        -5,010                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-018        -1,488                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-019             0                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-021         6,109                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-022         6,545                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-023             0                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-024         8,677                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-025         4,871                  06/12/20   07/14/20    SJ THOMAS CO.,INC.                  
                                                            G3A-026             0                  01/15/21   04/21/21    SJ THOMAS CO., INC.                 
                                                            G3A-027         8,661                  01/15/21   05/25/21    SJ THOMAS CO., INC.                 
                                                            G3A-028         8,661                  01/15/21   05/25/21    SJ THOMAS CO., INC.                 
                                                            G3A-029        96,148                  01/21/21   05/25/21    SJ THOMAS CO., INC.                 
                                                            G3A-030         1,870                  01/15/21   05/25/21    SJ THOMAS CO., INC.                 
                                                            G3A-032        -5,489                  01/15/21   05/25/21    SJ THOMAS CO., INC.                 
                                                            H3A-001             0                  06/12/20   07/17/20    ERIE MECHANICAL CONTRACTORS         
                                                            H3A-002             0                  07/01/20   07/27/20    PATRICIA ELECTRIC                   
                                                            H3A-003         2,911                  06/12/20   07/17/20    ERIE MECHANICAL CONTRACTORS         
                                                            H3A-004        33,500                  01/21/21   04/09/21    ERIE MECHANICAL CONTRACTORS         
                                                            H3A-005        17,000                  01/15/21   03/17/21    ERIE MECHANICAL CONTRACTORS         
                                                            H3A-006             0                  01/15/21   03/17/21    ERIE MECHANICAL CONTRACTORS         
                                                            H3A-008        -9,851                  01/15/21   03/17/21    ERIE MECHANICAL CONTRACTORS         
                                                            P3A-001        10,564                  01/15/21   03/17/21    ERIE MECHANICAL CONTRACTORS         
                                                            P3A-003       -17,384                  01/15/21   03/17/21    ERIE MECHANICAL CONTRACTORS         
 
16-1283   Reconstruction               0-007-020  04/04/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0579   Reconstruction               0-007-021  03/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HMICO001            0                  03/05/18   03/23/18    HMI Mechanical Systems, Inc.        
                                                            HMICO002            0                  03/05/18   03/23/18    HMI Mechanical Systems, Inc.        
 
18-1381   Reconstruction               0-007-022  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001              0                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            EC-003A         5,081                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            GC-008              0                  02/05/21   03/23/21    S.J. THOMAS CO., INC.               
                                                            GC-009A         4,880                  03/02/21   04/20/21    S.J. THOMAS CO., INC.               
                                                            GC-011              0                  03/02/21   04/20/21    S.J. THOMAS CO., INC.               
 
19-0975   Reconstruction               0-007-023  06/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0371   Reconstruction               0-007-024  12/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-002              0                  06/18/21   03/14/22    Bellows Construction Specialties    
                                                            GC-003              0                  06/18/21   03/14/22    Bellows Construction Specialties    
                                                            GC-004            309                  06/18/21   03/14/22    Bellows Construction Specialties    
                                                            GC-01           7,568                  05/10/21   07/09/21    BELLOWS CONSTRUCTION SPECIALTIES,LLC
 
20-1659   Reconstruction               0-007-025  06/09/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -4,000                  07/01/22   05/15/23    McGinnis Nelson Const               
 
21-1030   Reconstruction               0-007-026  04/12/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  05/09/23   12/22/23    S.J. THOMAS CO                      
                                                            GC-02          -7,486                  05/09/23   12/22/23    S.J. THOMAS CO                      
 
02-1043FP Reconstruction               0-007-FP1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pearl Palmer Elementary:
96-0684   Reconstruction               0-009-005  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1127   Reconstruction               0-009-006  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0148   Additions and Alterations    0-009-008  04/02/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -7,500                  05/08/03   05/27/03    Bette & Cring                       
                                                            001            57,350                  05/08/03   05/27/03    Bette & Cring                       
                                                            001             3,558                  03/04/05   03/24/05    Siemens Building tech               
                                                            002             8,469                  04/22/05   04/26/05    RC Daniels Inc                      
                                                            003               831                  04/05/05   05/02/05    Cortland Glass Co                   
                                                            003           -14,098                  08/22/05   09/02/05    Brosh mechanical                    
                                                            004             2,003                  06/22/05   07/12/05    RC Daniels Inc                      
                                                            007            22,662                  10/09/03   10/27/03    Bette & Cring                       
                                                            007             5,056                  10/05/05   10/13/05    RC Daniels                          
                                                            009             6,528                  09/27/05   10/13/05    RC Daniel Inc                       
                                                            013             4,313                  01/20/05   03/16/05    Bette Cring                         
                                                            016             9,848                  03/04/05   03/24/05    Bette Cring                         
                                                            017             1,000                  03/04/05   03/24/05    Bette Cring                         
                                                            019             1,991                  04/22/05   04/26/05    Bette Cring                         
                                                            020             1,114                  04/22/05   04/26/05    Bette Cring                         
                                                            022             5,678                  06/22/05   07/12/05    Bette Cring                         
                                                            023             9,208                  06/22/05   07/12/05    Bette Cring                         
                                                            GC11            3,904                  07/11/03   07/24/03    Bette & Cring                       
                                                            H-11          -22,552                  01/20/06   06/29/06    BOVIS LEND ELASE LMB, INC           
                                                            H-11            1,402                  01/20/06   06/29/06    BOVIS LEND LEASE, INC.              
                                                            P11-002        13,800                  08/07/03   08/14/03    Brosh Mech.                         
 
10-1242   Reconstruction               0-009-011  12/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            002             8,063                  01/07/13   04/05/13    BROSH MECHANICAL INC                
                                                            002                 0                  06/24/13   07/22/13    AIRTECH HEATING & A/C INC           
                                                            004             6,848                  01/10/13   03/26/13    MCK BUILDING ASSOCIATES INC         
                                                            004                 0                  01/23/13   07/17/13    BROSH MECHANICAL INC                
                                                            004                 0                  09/18/13   11/26/13    Myraid Construction, Inc.           
                                                            005                 0                  06/20/13   07/09/13    Brosh Mechanical, Inc.              
                                                            006                 0                  09/16/13   09/26/13    Brosh Mechanical, Inc.              
                                                            008             6,038                  01/10/13   03/26/13    MCK BUILDING ASSOCIATES INC         
                                                            008                 0                  03/06/14   05/30/14    Myriad Construction, Inc.           
                                                            009                 0                  03/06/13   05/31/13    MCK BUILDING ASSOCAITES INC         
                                                            010                 0                  03/06/13   05/31/13    MCK BUILDING ASSOCIATES INC         
                                                            011                 0                  03/06/13   05/31/13    MCK BUILDING ASSOCIATES INC         
                                                            012                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            012                 0                  04/04/14   04/21/14    Airtech Heating and Air Conditioning
                                                            013                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            014                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            015                 0                  04/10/13   06/28/13    MCK BUILDING ASSOCIATES INC         
                                                            017             9,660                  04/10/13   06/28/13    MCK BUILDING ASSOCIATES INC         
                                                            025                 0                  09/18/13   12/04/13    MCK BUILDING ASSOCIATES INC         
                                                            025                 0                  04/23/14   05/02/14    Myriad Contractors, Inc.            
                                                            026                 0                  04/23/14   05/02/14    Myriad Construction, Inc.           
                                                            029                 0                  02/24/14   03/10/14    MCK Building Associates, Inc.       
                                                            030                 0                  02/06/14     /  /      BCK Building Associates, Inc.       
                                                            030                 0                  01/28/14   08/29/14    mck                                 
 
16-0580   Reconstruction               0-009-012  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1382   Reconstruction               0-009-013  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002A             0                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            EC-003B         1,157                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            GC-001A             0                  02/05/21   03/23/21    S.J. THOMAS CO., INC.               
                                                            GC-006A             0                  02/05/21   05/20/21    S.J. THOMAS CO., INC.               
                                                            GC-007A             0                  02/05/21   04/19/21    S.J. THOMAS CO., INC.               
 
02-1044FP Reconstruction               0-009-FP1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Catherine McNamara Elem.:
96-0683   Reconstruction               0-010-004  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1128   Reconstruction               0-010-005  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0149   Additions and Alterations    0-010-007  04/02/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,500                  11/01/04   11/23/04    Cortland Glass Co                   
                                                            002            -7,500                  05/08/03   05/27/03    Bette & Cring                       
                                                            002            57,300                  05/08/03   05/27/03    Bette & Cring                       
                                                            002           -30,000                  11/01/04   12/06/04    Cortland Glass Co                   
                                                            002                44                  03/04/05   03/24/05    Siemens Building Tech               
                                                            003             4,410                  05/08/03   05/27/03    Bette & Cring                       
                                                            003             6,436                  04/22/05   04/26/05    RC Daniels                          
                                                            004            10,511                  05/08/03   05/27/03    Bette & Cring                       
                                                            005             1,811                  06/22/05   07/12/05    RC Daniel Inc                       
                                                            006             5,056                  08/22/05   09/02/05    RC Daniel                           
                                                            008            23,912                  10/09/03   10/27/03    Bette & Cring                       
                                                            008             7,972                  09/27/05   10/13/05    RC Daniels Inc                      
                                                            009            22,332                  10/09/03   10/27/03    Bette & Cring                       
                                                            012             4,017                  01/20/05   03/16/05    Bette Cring                         
                                                            014             1,251                  03/04/05   03/24/05    Bette Cring                         
                                                            015             3,236                  03/04/05   03/24/05    Bette Cring                         
                                                            018             4,762                  04/08/05   06/21/05    Bette Cring                         
                                                            021             2,695                  07/01/05   07/19/05    Bette Cring                         
                                                            024             4,757                  06/22/05   07/12/05    Bette Crin g                        
                                                            025             1,496                  08/22/05   09/02/05    Bette Cring                         
                                                            026             2,930                  09/27/05   10/13/05    Bette Cring                         
                                                            E-11-001      -20,000                  08/19/04   09/23/04    RC Daniels                          
                                                            GC-10         -20,000                  08/19/04   09/23/04    Bette & Cring                       
                                                            GC-11         -20,000                  08/19/04   09/23/04    Bette & Cring                       
                                                            GC11-005        8,067                  07/11/03   07/24/03    Bette & Cring                       
                                                            H-11            1,372                  01/20/06   06/29/06    BROSH MECHANICAL, INC.              
                                                            H-11-001      -20,000                  08/19/04   09/23/04    Brosh Mech.                         
                                                            M-11-003      -40,000                  08/19/04   09/23/04    Bette & Cring                       
                                                            P11-001        13,800                  08/07/03   08/14/03    Brosh Mech.                         
 
10-1243   Reconstruction               0-010-010  12/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             3,052                  01/07/13   02/19/14    BROSH MECHANICAL INC                
                                                            001                 0                  06/20/13   07/09/13    Airtech Heating and Air Conditioning
                                                            003             8,063                  01/07/13   03/25/13    BROSH MECHANICAL INC                
                                                            003             6,648                  01/10/13   03/26/13    MCK BUILDING ASSOCIATES INC         
                                                            005              -871                  01/07/13   04/05/13    MCK BUILDING ASSOCIATES INC         
                                                            006                 0                  09/16/13   09/26/13    Myraid Construction, Inc.           
                                                            007             6,038                  01/10/13   03/26/13    MCK BUILDING ASSOCIATES INC         
                                                            007           -16,814                  05/09/14   05/21/14    Brosh Mechanical, Inc.              
                                                            010                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            011                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            012                 0                  03/06/13   05/31/13    MCK BUILDING ASSOCIATES INC         
                                                            013                 0                  03/06/13   05/31/13    MCK BUILDING ASSOCIATES INC         
                                                            013                 0                  04/04/14   04/21/14    Airtech Heating and Air Conditioning
                                                            014                 0                  04/10/13   06/28/13    MCK BUILDING ASSOCIATES INC         
                                                            014                 0                  04/04/14   04/21/14    Airtech Heating and Air Conditioning
                                                            016             9,660                  04/10/13   06/28/13    MCK BUILDING ASSOCIATES INC         
                                                            019                 0                  04/17/14   05/16/14    MYRIAD CONSTRUCTION INC             
                                                            020             5,551                  05/01/13   07/01/13    MCK BUILDING ASSOCIATES INC         
                                                            020             3,340                  04/17/14   05/16/14    MYRIAD CONSTRUCTION INC             
                                                            021            60,000                  09/23/13   11/26/13    MCK Building Associates, Inc.       
                                                            021                 0                  04/23/14   05/02/14    Myriad Construction, Inc.           
                                                            022                 0                  06/20/13   07/09/13    MCK Building Associates, Inc.       
                                                            022                 0                  04/23/14   05/02/14    Myraid Construction, Inc.           
                                                            023                 0                  04/23/14   05/02/14    Myraid Construction, Inc.           
                                                            024                 0                  09/16/13   09/30/13    MCK Building Associates, Inc.       
                                                            024                 0                  04/23/14   05/02/14    Myriad Construction, Inc.           
                                                            027              -404                  02/24/14   03/10/14    MCK Building Associates, Inc.       
                                                            028            -3,146                  05/15/14   05/30/14    Myraid Construction, Inc.           
                                                            031                 0                  02/06/14   03/21/14    MCK Building Associates, Inc.       
 
16-0581   Reconstruction               0-010-011  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1383   Reconstruction               0-010-012  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002B             0                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            EC-003C         1,670                  02/05/21   03/30/21    PATRICIA ELECTRIC, INC.             
                                                            GC-001B             0                  02/05/21   04/19/21    S.J. THOMAS CO., INC.               
                                                            GC-006B             0                  02/05/21   04/19/21    S.J. THOMAS CO., INC.               
                                                            GC-007B             0                  02/05/21   03/23/21    S.J. THOMAS CO., INC.               
 
22-0559   Reconstruction               0-010-015  01/17/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC2-001             0                  08/21/23   01/09/24    ERIE MECHANICAL                     
                                                            PC2-002        19,895                  08/21/23   01/09/24    ERIE MECHANICAL                     
                                                            SC2-001             0                  08/14/23   12/21/23    SHAWN MALONE EXCAVATING             
                                                            SC2-003        36,722                  08/14/23     /  /      SHAWN MALONE EXCAVATING             
                                                            sc2-002        33,500                  08/14/23   12/21/23    SHAWM MALONE EXCAVATING             
 
22-2316   Reconstruction               0-010-016  07/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1045FP Reconstruction               0-010-FP1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mae E. Reynolds Elem.:
96-0686   Reconstruction               0-011-003  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0942   Additions and Alterations    0-011-006  09/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,898                  06/20/05   06/30/05    LeFrance Plumbing Heatin g          
                                                            002               262                  12/05/05   07/21/06    Bette Cring                         
                                                            002                 0                  06/14/06   06/23/06    Kaplan Schmidt Electric             
                                                            006              -191                  03/02/06   07/21/06    Bette Cring                         
                                                            H31-001             0                  06/29/06   08/11/06    Airtech heating                     
                                                            P-31            3,098                  12/08/05   06/30/06    LAFRANCE PLUMBING & HEATING         
 
05-0313   Reconstruction               0-011-007  02/16/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001           -27,970                  08/02/06   08/14/06    EV Roofing Construction             
                                                            002           -36,026                  01/24/07   03/14/07    EV Roofing Construction             
                                                            002                 0                  05/03/07   05/15/07    Myriad Construction                 
                                                            003                 0                  03/02/07   03/13/07    Edward Joy                          
                                                            007                 0                  03/22/07   04/03/07    RJ Ortleib Construction             
 
09-0687   Reconstruction               0-011-009  07/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-029             0                  07/26/12   11/20/12    King & King Architect LLP           
                                                            002-034         6,238                  07/26/12   11/20/12    King & King Architects LLP          
                                                            003-003             0                  07/26/12   11/20/12    King & King Architect LLP           
                                                            005           -11,329                  01/10/13   10/11/13    HMI MECHANICAL SYSTEMS INC          
                                                            006                 0                  04/25/13   10/23/13    HMI MECHANICAL SYSTEMS INC          
                                                            007           -18,095                  04/25/13     /  /      HMI MECHANICAL SYSTEMS INC          
                                                            015                 0                  10/17/11   05/15/12    HUEN NEW YORK                       
                                                            017             2,221                  01/07/13   07/16/13    BURNS BROS CONTRACTORS              
                                                            022            -7,310                  03/05/12   09/18/12    HUEN NEW YORK                       
                                                            038                 0                  03/06/13   09/19/13    HUEN NEW YORK                       
                                                            043            -1,378                  04/10/13   06/28/13    HUEN NEW YORK                       
                                                            044                 0                  06/20/13   10/11/13    Huen New York                       
                                                            047                 0                  09/16/13   11/26/13    Huen New York                       
                                                            062             8,407                  01/23/13   04/16/13    R.J. ORTLIEB                        
                                                            066                 0                  03/06/13   12/04/13    R.J. ORTLIEB                        
                                                            067                 0                  03/06/13   09/13/13    R.J. ORTLIEB                        
                                                            072            23,729                  04/25/13   07/12/13    R.J. ORTLIEB                        
 
16-0582   Reconstruction               0-011-010  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0666   Reconstruction               0-011-011  11/09/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  10/15/18   11/08/18    BELLOW CONSTRUCTION SPECIALTIES LLC 
                                                            GC-02          -4,366                  10/15/18   11/08/18    BELLOW CONSTRUCTION SPECIALTIES ;LLC
 
18-1384   Reconstruction               0-011-012  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-009B         2,000                  03/02/21   04/20/21    S.J. THOMAS CO., INC.               
 
19-0976   Reconstruction               0-011-013  06/03/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-001             0                  01/03/22   10/11/22    Concord Elec Corp                   
                                                            EC2-002        14,160                  01/03/22   10/11/22    Concord Elec Corp                   
                                                            GC2-002           925                  01/03/22     /  /      Bette&Cring Const Group             
                                                            GC2-003             0                  01/03/22   12/27/22    Bette&Cring Const Group             
                                                            GC2-008         6,126                  01/03/22   12/27/22    Bette&Cring Const Group             
                                                            GC2-009       -49,658                  01/03/22   12/27/22    Bette&Cring Const Group             
                                                            HC2-002             0                  01/03/22   10/11/22    Erie Mech                           
                                                            PC2-001        -5,000                  01/03/22   10/11/22    Erie Mech                           
 
21-1026   Reconstruction               0-011-014  07/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  07/31/23   12/27/23    DIEKOW ELEC INC                     
                                                            002                 0                  07/31/23     /  /      RJ ORTLIEB CONST CO                 
                                                            GC1-003        -2,705                  09/11/23     /  /      RJ ORTLIEB CONST CO                 
                                                            GC1-005             0                  09/11/23     /  /      RJ ORTLIEB CONST CO                 
                                                            GC1-006        10,142                  09/11/23     /  /      RJ ORTLIEB CONST CO                 
                                                            HC1-001             0                  09/11/23   12/26/23    ERIE MECHANICAL                     
                                                            SC1-002       -13,920                  09/11/23     /  /      VITALE COMPANIES                    
                                                            SC1-003             0                  09/11/23     /  /      VITALE COMPANIES                    
                                                            SC1-004        -4,655                  09/11/23     /  /      VITALE COMPANIES                    
 
22-0558   Reconstruction               0-011-015  01/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1046FP Reconstruction               0-011-FP1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Donald S. Ray Middle School:
92-0340   Reconstruction               0-012-002  11/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0685   Additions and Alterations    0-012-003  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0421   Reconstruction               0-012-004  02/24/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0943   Additions and Alterations    0-012-005  09/15/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003                 0                  06/14/06   10/27/06    Kaplan Schmidt electric             
                                                            H31-002             0                  06/29/06   08/11/06    Airtech heating                     
 
10-1244   Reconstruction               0-012-008  12/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -22,166                  01/10/13   03/26/13    MCK BUILDING ASSOCIATES INC         
                                                            001            20,835                  03/06/13   06/03/13    MYRIAD CONSTRUCTION INC             
                                                            002            16,272                  02/19/13   05/08/13    MCK BUILDING ASSOCIATES INC         
                                                            002                 0                  03/06/13   06/03/13    MYRIAD CONSTRUCTION INC             
                                                            003           -48,900                  05/01/13   07/08/13    Myraid Construction, Inc.           
                                                            003            11,424                  11/04/13   11/20/13    AIRTECH HEATING & A/C INC           
                                                            003-019        17,392                  05/06/13   07/08/13    MCK Building Associates, Inc.       
                                                            004                 0                  02/06/14   03/21/14    Airtech Heating and Air Conditioning
                                                            005                 0                  09/16/13   11/26/13    Myriad Construction, Inc.           
                                                            005                 0                  02/06/14   03/21/14    Airtech Heating and Air Conditioning
                                                            006            24,887                  04/04/14   04/21/14    Airtech Heating and Air Conditioning
                                                            007             7,238                  02/20/14   03/13/14    Myriad Construction, Inc.           
                                                            007            -3,000                  03/05/14   07/21/14    Airtech Heating and Air Conditioning
                                                            008            33,044                  04/04/14   04/21/14    Airtech Heating and Air Conditioning
                                                            009                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            009            30,180                  04/04/14   04/21/14    Airtech Heating and Air Conditioning
                                                            010                 0                  04/17/14   05/16/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            011                 0                  04/17/14   05/16/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            015                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            015           -38,978                  04/17/14   05/16/14    AIRTECH HEATING & AIR CONDITIONING  
                                                            016                 0                  03/05/14   07/21/14    Myriad Construction, Inc.           
                                                            017                 0                  04/17/14   05/16/14    MYRIAD CONSTRUCTION INC             
                                                            018            12,995                  04/25/13   07/12/13    MCK BUILIDING ASSOCIATES INC        
                                                            018                 0                  04/17/14   05/16/14    MYRIAD CONSTRUCTION INC             
                                                            023                 0                  06/24/13   11/22/13    MCK BUILDING ASSOCIATES INC         
                                                            026            14,928                  11/04/13   12/04/13    MCK BUILDING ASSOCIATES INC         
                                                            027            -5,028                  05/15/14   05/30/14    Myraid Construction, Inc.           
                                                            028                 0                  02/24/14   03/10/14    MCK Building Associates, Inc.       
                                                            033           -10,000                  02/06/14   03/21/14    MCK Building Associates, Inc.       
                                                            034            -5,000                  03/06/14   05/30/14    MCK Building Associates, Inc.       
                                                            035                 0                  03/06/14   05/30/14    MCK Building Associates, Inc.       
                                                            036           -18,633                  03/06/14   05/30/14    MCK Building Associates, Inc.       
 
13-0073   Reconstruction               0-012-009  08/01/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0712   Reconstruction               0-012-010  12/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-01          -45,000                  12/22/14   01/12/15    Wilkins Mechanical, Inc.            
 
14-0730   Reconstruction               0-012-011  10/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1A-001        -5,081                  05/18/17   06/26/17    Billitier Electric                  
                                                            E1A-002             0                  05/18/17   06/26/17    Billitier Electric                  
                                                            E1A-002        -5,081                  08/17/17   09/07/17    Billitier Electric Inc.             
                                                            E1A-005             0                  09/29/17   10/10/17    Billitier Electric, Inc.            
                                                            E1A-015        19,803                  08/02/17   09/07/17    Billitier Electric, Inc.            
                                                            E1A-018             0                  08/09/18   02/04/19    BILLITIER ELECTRIC, INC.            
                                                            G1A-004             0                  08/17/17   09/07/17    PAC Construction                    
                                                            G1A-009        37,380                  08/28/17   09/06/17    PAC Construction                    
                                                            G1A-010        49,587                  08/28/17   09/06/17    PAC Construction                    
                                                            G1A-012          -800                  08/17/17   09/07/17    PAC Construction                    
                                                            G1A-028       -17,670                  08/28/17   09/06/17    PAC & Associates of Oswego, Inc.    
                                                            G1A-029             0                  08/09/18   12/28/18    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-043         1,260                  08/15/18   01/03/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-044        -7,550                  08/09/18   03/11/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-048             0                  08/09/18   01/03/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            G1A-050         1,337                  08/09/18   03/29/19    PAC & ASSOCIATES OF OSWEGO, INC.    
                                                            M1A-004             0                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-007             0                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-008         2,800                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-010         5,898                  06/28/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-013             0                  06/20/17   07/14/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-016        -1,964                  08/17/17   09/07/17    Erie Mechanical Contractors, Inc.   
                                                            M1A-020        28,513                  12/12/18   01/11/19    ERIE MECHANICAL CONTRACTOR, INC.    
                                                            M1A-022             0                  08/09/18     /  /      ERIE MECHANICAL CONTRACTORS INC     
                                                            P1A-004        18,119                  08/02/17   09/07/17    Erie Mechanical Contractors, Inc.   
                                                            S1A-003        55,500                  08/28/17   09/06/17    Vitale Companies                    
                                                            S1A-004         8,755                  08/28/17   09/14/17    Paul F. Vitale, Inc.                
                                                            S1A-005        38,560                  08/28/17   02/13/18    Paul F. Vitale, Inc.                
                                                            S1A-006        20,553                  08/28/17   09/14/17    Paul F. Vitale, Inc.                
                                                            S1A-007       -23,736                  08/09/18   01/03/19    PAUL F. VITALE, INC.                
                                                            S1A-008         1,532                  08/09/18   03/11/19    PAUL F. VITALE, INC.                
 
13-1617   Reconstruction               0-012-012  06/16/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0117   Reconstruction               0-012-013  07/31/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1163   Reconstruction               0-012-014  12/19/18  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0583   Reconstruction               0-012-015  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0188   Reconstruction               0-012-016  09/05/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        -25,000                  02/08/19   03/14/19    RUSTON PAVING COMPANY INC           
                                                            GC-002              0                  09/05/19   09/27/19    RUSTON PAVING CO.,INC.              
                                                            GC-003         -3,668                  09/05/19   09/26/19    RUSTON PAVING CO.,INC.              
 
18-1385   Reconstruction               0-012-017  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-005              0                  02/05/21   03/23/21    S.J. THOMAS CO., INC.               
                                                            GC-010          3,829                  03/02/21   04/20/21    S.J. THOMAS CO., INC.               
 
19-0977   Reconstruction               0-012-018  06/03/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1027   Reconstruction               0-012-019  07/25/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC1-001        -3,504                  04/17/23   01/02/24    SITE WORK CONTRACTOR                
 
02-1047FP Reconstruction               0-012-FP1  02/19/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Office:
96-0689   Reconstruction               1-017-002  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0314   Reconstruction               1-017-003  02/16/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            11,415                  08/02/06   08/14/06    RJ Ortleib Construction             
                                                            001             5,117                  09/12/06   10/27/06    Edward Joy                          
                                                            001            -6,000                  09/29/06   10/24/06    Apple Roofing                       
                                                            001           -32,248                  04/17/07   05/15/07    Airside Technology Corp             
                                                            002             9,956                  08/02/06   08/14/06    RJ Ortleib Construction             
                                                            004             5,565                  09/25/06   10/27/06    RJ Ortlieb Construction             
                                                            004           -33,045                  03/02/07   03/13/07    Apple Roofing Corp                  
                                                            004            -6,360                  05/03/07   09/14/07    Myriad Construction                 
                                                            005            14,407                  09/25/06   10/30/06    RJ Ortleib Construction             
                                                            005           -21,438                  03/02/07   03/13/07    Edward Joy                          
                                                            010           -89,172                  03/22/07   04/03/07    RK Ortleib Construction             
 
16-0584   Reconstruction               1-017-004  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Shelter:
95-1129   Reconstruction               4-002-001  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0688   Reconstruction               4-002-002  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0315   Reconstruction               4-002-003  02/16/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            -5,274                  08/02/06   08/14/06    RJ Ortlieb Construction             
                                                            003                 0                  05/03/07   05/15/07    Myriad Construction                 
                                                            009                 0                  03/22/07   04/03/07    RK Ortleib Construction             
 
16-0585   Reconstruction               4-002-004  03/17/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          DistrictOperations(NoBldgAid-FmrBusG:
96-0687   Reconstruction               5-018-004  02/19/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1226   Reconstruction               5-018-005  11/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001/E1         -1,993                  04/03/02   04/17/03    Myriad Construction                 
                                                            001/P1-2        7,000                  08/29/02   09/03/02    LaFrance Plumbing                   
 
05-0316   Reconstruction               5-018-006  02/16/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003                 0                  03/02/07   03/13/07    Apple Roofing                       
                                                            004                 0                  03/13/07   04/03/07    Edward Joy Corp                     
                                                            008                 0                  03/22/07   04/03/07    RK Ortleib Construction             
 
07-1697   Reconstruction               5-018-007  05/19/08  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0586   Reconstruction               5-018-008  03/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 

          Bus Maintenance Facility:
16-1683SR New Construction             5-028-001  08/17/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-001              0                  08/09/18     /  /      LECHASE CONSTRUCTION                
                                                            S1-005              0                  09/07/18   09/19/18    LAN-CO COMPANIES                    
 
17-0070   New Construction             5-028-001  05/10/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC1A-003      -46,100                  01/04/21   02/25/21    MYRIAD CONSTRUCTION, INC.           
                                                            EC1B-002            0                  05/14/19   05/15/19    KNAPP ELECTRIC, INC.                
                                                            EC1B-003            0                  05/14/19   05/15/19    KNAPP ELECTRIC, INC.                
                                                            EC1B-004            0                  05/14/19   05/15/19    KNAPP ELECTRIC, INC.                
                                                            EC1B-005            0                  09/19/19   09/24/19    KNAPP ELECTRIC, INC.                
                                                            EC1B-006            0                  09/26/19   09/30/19    KNAPP ELECTRIC, ICN.                
                                                            EC1B-007            0                  10/03/19   10/17/19    KNAPP ELECTRIC, INC.                
                                                            EC1B-008            0                  10/16/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC1B-009            0                  11/15/19   11/18/19    KNAPP ELECTRIC, INC.                
                                                            EC1B-010            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-011            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-012            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-013            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-014            0                  07/01/20   07/27/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-015            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-016            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-017        4,323                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-018            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-019            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-020            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-021            0                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-022        4,092                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-023        2,193                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-024        2,875                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-025        1,158                  06/12/20   07/17/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-026        3,661                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-027       19,083                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-028       14,754                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-029          695                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-030        1,063                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-031        3,100                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-032        4,093                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-033       11,090                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-034        8,706                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-035       24,664                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-036        7,485                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-037        2,389                  10/14/20   12/18/20    KNAPP ELECTRIC, INC.                
                                                            EC1B-038        3,160                  01/04/21   02/25/21    KNAPP ELECTRIC, INC.                
                                                            EC1B-039        5,390                  01/04/21   02/25/21    KNAPP ELECTRIC, INC.                
                                                            EC1B-040        7,153                  01/04/21   02/25/21    KNAPP ELECTRIC, INC.                
                                                            EC1B-041        2,524                  01/04/21   02/25/21    KNAPP ELECTRIC, INC.                
                                                            GC1B-001      335,000                  11/16/18   01/16/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-002            0                  11/16/18   01/16/19    MCK BUILDING ASOCIATES, INC.        
                                                            GC1B-003            0                  11/16/18   01/16/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-004            0                  05/09/19   05/29/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-005            0                  05/09/19   05/29/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-006            0                  05/09/19   05/29/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-007            0                  05/09/19   05/29/19    MCK BUILDING ASSOCIATES,INC.        
                                                            GC1B-008            0                  05/10/19   05/17/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-010            0                  06/12/19   06/19/19    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-011            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-012            0                  07/01/20   07/27/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-013            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-015            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-016            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-017            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-018            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-019            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-020            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-021            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-022            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-023            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-024            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-025            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-026            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-027            0                  06/12/20   07/14/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-028            0                  06/12/20   07/14/20    MCK BUILDING ASSOCITES, INC.        
                                                            GC1B-029            0                  06/12/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-030            0                  06/12/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-031            0                  06/12/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-032            0                  06/12/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-033            0                  06/12/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-034            0                  06/12/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-035            0                  06/12/20   07/15/20    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-036            0                  01/04/21   03/16/21    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-037            0                  01/21/21   04/01/21    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-039      -49,549                  01/04/21   03/16/21    MCK BUILDING ASSOCIATES, INC.       
                                                            GC1B-040       -9,000                  01/04/21   03/16/21    MCK BUILDING ASSOCIATES, INC.       
                                                            HVAC-001            0                  07/24/19   07/30/19    LAWMAN HEATING & COOLING INC.       
                                                            HVAC-002            0                  07/01/20   07/27/20    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-003      -69,843                  07/01/20   07/27/20    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-005     -127,491                  01/04/21   02/25/21    LAWMAN HEATING & COOLING, INC.      
                                                            PC1B-001            0                  05/09/19   05/10/19    ERIE MECHANICAL CONTRACTORS         
                                                            PC1B-002            0                  05/10/19   05/13/19    ERIE MECHANICAL CONTRACTOR          
                                                            PC1B-003            0                  06/12/19   06/14/19    ERIE MECHANICAL CONTRACTORS         
                                                            PC1B-004       25,357                  09/19/19   09/24/19    ERIE MECHANICAL CONTRACTORS         
                                                            PC1B-005            0                  06/12/20   07/17/20    ERIE MECHANICAL CONTRACTORS         
                                                            PC1B-006       62,388                  07/01/20   07/27/20    ERIE MECHANICAL CONTRACTORS         
                                                            PC1B-007        1,950                  01/04/21   02/25/21    ERIE MECHANICAL CONTRACTORS         
                                                            PC1B-009       -7,007                  01/04/21   02/25/21    ERIE MECHANICAL CONTRACTORS         
                                                            RC1B-001            0                  06/12/20   07/14/20    TITAN ROOFING                       
                                                            RC1B-004     -116,131                  10/14/20   12/30/20    TITAN ROOFING                       
                                                            S1-001              0                  08/09/18   01/24/19    LAN-CO COMPANIES, INC.              
                                                            S1-002              0                  08/09/18   01/24/19    LAN-CO COMPANIES, INC.              
                                                            S1-003              0                  08/09/18   01/15/19    LAN-CO COMPANIES, INC.              
                                                            S1-004              0                  08/09/18   01/24/19    LAN-CO COMPANIES, INC.              
                                                            S1A-006             0                  02/28/19   03/14/19    LAN-CO COMPANIES                    
                                                            S1A-008             0                  05/09/19   05/10/19    LAN-CO CO.                          
                                                            S1A-009             0                  05/10/19   05/17/19    LAN-CO CO.                          
                                                            S1A-010             0                  05/09/19   05/10/19    LAN-CO CO.                          
                                                            S1A-011       -21,385                  10/16/19   10/22/19    LAN-CO COMPANY                      
                                                            S1A-012             0                  11/15/19   11/20/19    LAN-CO CO.                          
                                                            S1A-013             0                  11/15/19   11/20/19    LAN-CO CO.                          
                                                            S1A-014             0                  11/15/19   11/20/19    LAN-CO CO.                          
                                                            S1A-015             0                  11/15/19   11/20/19    LAN-CO CO.                          
                                                            S1A-016             0                  11/15/19   11/20/19    LAN-CO CO.                          
                                                            S1A-017             0                  11/15/19   11/20/19    LAN-CO CO.                          
 

          Baldwinsville Public Library:
93-1371   New Construction             6-021-001  06/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0216   Reconstruction               6-021-002  09/17/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01             619                  12/12/11   07/13/12    BACON & SEILER CONSTRUCTORS         
 
14-0731   Reconstruction               6-021-003  10/22/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1607   Reconstruction               6-021-004  05/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R2-002            382                  08/06/18   08/17/18    LECHASE CONSTRUCTION                
                                                            R2-004              0                  08/06/18   08/17/18    LECHASE CONSTRUCTION                
 
19-0441   Reconstruction               6-021-005  02/12/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0560   Reconstruction               6-021-006  01/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0543   Reconstruction               6-021-007  01/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pelcher/Arcaro Stadium/Restroom:
09-0688   New Construction             7-025-001  07/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            35,200                  03/23/11   04/22/11    R.J. ORTLIEB                        
                                                            002            -3,718                  03/05/12   08/29/12    HMI MECHANICAL SYSTEMS INC          
                                                            004            11,468                  06/27/11   07/15/11    R.J. ORTLIEB                        
                                                            004           -40,075                  08/01/11   11/09/11    HUEN NEW YORK                       
                                                            004                 0                  01/07/13   07/16/13    HMI MECHANICAL SYSTEMS INC          
                                                            005            25,318                  08/01/11   11/09/11    HUEN NEW YORK                       
                                                            006               -31                  08/01/11   11/09/11    HUEN NEW YORK                       
                                                            008             5,226                  03/05/12   09/18/12    BURNS BROS CONTRACTORS              
                                                            013                 0                  07/26/12   11/20/12    King & King Architects LLP          
                                                            014                 0                  10/17/11   05/15/12    HUEN NEW YORK                       
                                                            014                 0                  10/19/11   12/12/11    R.J. ORTLIEB                        
                                                            017            20,020                  10/17/11   05/15/12    HUEN NEW YORK                       
                                                            018            11,550                  12/12/11   07/13/12    R.J. ORTLIEB                        
                                                            019                 0                  01/19/12   04/12/12    HUEN NEW YORK                       
                                                            020                 0                  01/19/12   04/12/12    HUEN NEW YORK                       
                                                            022                 0                  01/19/12   04/06/12    R.J. ORTLIEB                        
                                                            023                 0                  01/19/12   04/06/12    R.J. ORTLIEB                        
                                                            023             3,327                  03/05/12   08/29/12    HUEN NEW YORK                       
                                                            030            12,664                  04/18/12   08/30/12    R.J. ORTLIEB                        
                                                            032                 0                  07/26/12     /  /      King & King Architects LLP          
                                                            032            14,422                  04/18/12     /  /      R.J. ORTLIEB                        
                                                            032                 0                  07/26/12   01/10/13    HUEN NEW YORK                       
                                                            034            18,691                  04/18/12   08/30/12    R.J. ORTLIEB                        
                                                            035             3,642                  09/06/12   07/29/13    HUEN NEW YORK                       
                                                            039                 0                  03/06/13   07/16/13    HUEN NEW YORK                       
                                                            042              -531                  07/26/12     /  /      King & King Architects LLP          
                                                            042                 0                  07/26/12   12/21/12    R.J. ORTLIEB                        
                                                            049             8,925                  08/22/12   12/10/12    R.J. ORTLIEB                        
                                                            051             2,583                  08/22/12   12/10/12    R.J. ORTLIEB                        
                                                            068                 0                  03/06/13   05/31/13    R.J. ORTLIEB                        
                                                            073             7,027                  04/10/13   11/25/13    R.J. ORTLIEB                        
 

          XXPress Box 3-Pelcher/Arcaro Stadium:
14-1160   New Construction             7-027-001  08/10/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001                 0                  04/11/16   12/28/16    Ridley Electric Co, Inc.            
                                                            001            83,000                  05/02/16   07/07/16    Robert H. Law Inc.                  
                                                            002-008             0                  08/17/17   08/22/17    Ridley Electric Company             
                                                            002-009             0                  08/17/17   08/22/17    Ridley Electric Company             
                                                            002-010             0                  08/17/17   08/22/17    Ridley Electric Company             
                                                            002-011             0                  08/06/18   08/15/18    RIDLEY ELECTRIC                     
                                                            S2-004         43,160                  08/28/17   10/10/17    Robert H. Law Inc.                  
                                                            S2-005         32,360                  08/28/17   10/10/17    Robert H. Law Inc.                  
                                                            S2-006              0                  08/17/17   09/07/17    Robert H. Law Inc.                  
                                                            S2-007              0                  08/17/17   09/07/17    Robert H. Law Inc.                  
                                                            S2-008              0                  08/17/17   09/07/17    Robert H. Law Inc.                  
                                                            S2-009              0                  08/17/17   09/07/17    Robert H. Law, Inc.                 
                                                            S2-010        -40,819                  10/09/18   10/24/18    R.H. LAW INC                        
 

          District-Wide:
94-1693   Reconstruction               7-999-001  07/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1227   Reconstruction               7-999-002  11/14/01  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1079   Reconstruction               7-999-004  03/05/20  NO CHANGE ORDERS ON ELECTRONIC FILE

FAYETTEVILLE-MANLIUS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 42-10-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Wellwood Middle School:
92-0903   Reconstruction               0-003-002  05/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1421   Reconstruction               0-003-003  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1507   Additions and Alterations    0-003-004  06/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0733   Reconstruction               0-003-005  03/22/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          162,000                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-12           4,156                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-13           8,430                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-13         -12,185                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-3          350,000                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-4           13,662                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-5            1,657                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-8            5,197                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            H-1             1,330                  05/01/08     /  /      AIRTECH H & AC SYSTEMS INC.         
                                                            H-2             1,966                  05/01/08     /  /      AIRTECH H & AC SYSTEMS INC.         
                                                            H-2            -2,000                  05/01/08     /  /      AIRTECH H & AC SYSTEMS INC.         
 
99-0760   Additions and Alterations    0-003-006  05/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4           64,739                  08/29/01   01/08/02    Bette & Cring                       
                                                            GC-7            7,674                  02/28/02   04/29/02    Bette & Cring                       
 
99-0883   Reconstruction               0-003-007  02/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            41,220                  10/17/00   12/01/03    Edgeline Elec.                      
 
01-0361   Additions and Alterations    0-003-008  06/28/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-10                0                  07/26/04   08/02/04    Ridley Elec.                        
                                                            E-2             4,426                  11/25/03   12/04/03    Ridley Elec.                        
                                                            E-6                 0                  03/15/04   04/23/04    Ridley Elec.                        
                                                            GC-14           1,717                  05/17/07   05/17/07    Bette Cring                         
                                                            GC-19          11,115                  07/26/04   08/02/04    Bette & Cring                       
                                                            GC-23           7,687                  01/06/05   01/25/05    Bette & Cring                       
                                                            GC-8           48,420                  03/01/04   03/04/04    Bette & Cring                       
                                                            H-1                 0                  06/29/04   07/06/04    EF Galvin                           
                                                            P-3              -450                  07/22/04   07/27/04    Bellucci Ent.                       
 
04-1312   Additions and Alterations    0-003-010  03/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1                 0                  05/03/07     /  /      Patricia Electric                   
                                                            E-2               203                  05/03/07     /  /      Patricia Electric                   
                                                            E-2               203                  05/03/07   05/16/07    Patricia Electric                   
                                                            GC-1                0                  04/02/07   05/14/07    Bouley Associates                   
                                                            GC-2           -1,944                  04/02/07   08/07/07    Bouley Associates                   
                                                            GC-3                0                  05/03/07   05/09/07    Bouley Associates                   
                                                            GC-4                0                  05/25/07   06/11/07    Bouley Associates                   
                                                            GC-5            7,697                  07/05/07   07/17/07    Bouley Associates                   
                                                            GC-6            2,098                  07/05/07     /  /      Bouley Associates                   
                                                            GC-7            4,452                  07/05/07   07/17/07    Bouley Associates                   
                                                            H-1                 0                  03/15/07   04/06/07    Edward Galvin Inc                   
                                                            H-2            -1,276                  04/02/07   01/18/12    Edward Glavin                       
                                                            P-1              -900                  04/02/07   01/18/12    Burns Brothers                      
 
05-1393   Reconstruction               0-003-011  09/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1527   Reconstruction               0-003-012  11/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AB-3            9,614                  10/17/08   04/21/09    TWO BROTHERS CONTRACTING, INC.      
                                                            AB-5           24,582                  01/07/09   03/03/09    TWO BROTHERS CONTRACTING INC.       
                                                            AB-6           17,186                  01/07/09   03/03/09    TWO BROTHERS CONTRACTING INC.       
                                                            AB-7           25,100                  01/07/09   03/03/09    TWO BROTHERS CONTRACTING INC.       
                                                            E-3            13,035                  01/07/09   03/05/09    EDGELINE ELECTRIC CORP.             
                                                            GC-15          31,462                  02/25/09   04/13/09    PAC & ASSOCIATES                    
                                                            GC-16           4,523                  02/25/09   04/13/09    PAC & ASSOCIATES                    
                                                            GC-19           7,073                  11/19/09   02/04/10    PAC & ASSOCIATES                    
                                                            GC-5            8,891                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-6           21,203                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-7           12,720                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-8            7,064                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            H-1             6,395                  11/20/08   07/09/09    AIRSIDE TECHNOLOGY                  
                                                            P-2            -1,239                  11/20/08   07/09/09    C&S PLUMBING & HEATING              
                                                            P-3             5,789                  05/29/09   08/06/09    C&S PLUMBING & HEATING              
                                                            P-4            -2,870                  05/29/09   08/06/09    C&S PLUMBING & HEATING              
                                                            R-6               162                  04/03/09   07/24/09    KASCON LLC                          
 
07-1407   Reconstruction               0-003-013  07/10/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0464   Reconstruction               0-003-014  02/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0084   Reconstruction               0-003-015  10/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-0004          1,413                  09/25/12   07/17/13    J&E ELECTRIC                        
                                                            E-0012          1,627                  03/05/13   07/17/13    J&E ELECTRIC                        
 
11-0243   Reconstruction               0-003-016  06/15/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           2,467                  06/18/12   10/26/12    Bellows Construction Specialties, LL
 
11-0181   Reconstruction               0-003-017  10/04/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             919                  05/16/12   12/13/12    EDGELINE ELECTRICAL CORP            
 
13-1069   Reconstruction               0-003-018  05/09/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1244   Reconstruction               0-003-019  06/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003           1,234                  10/01/15   11/17/15    Knapp Electric, Inc.                
                                                            00022             549                  10/22/15   11/17/15    Diamond & Thiel Construction Co.    
                                                            12               -236                  12/31/15   01/11/16    Knapp Electric, Inc.                
                                                            3             -19,330                  07/13/15   04/21/16    Diamond & Thiel Construction Co.    
                                                            30                353                  12/16/15   04/21/16    Diamond & Theil Construction Co.    
 
19-0059   Additions and Alterations    0-003-020  11/12/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CG-61          30,360                  08/23/21     /  /      C&S TECHMICAL RESOURCES, INC        
                                                            EC 11          11,958                  01/08/21   03/10/21    PATRICIA ELECTRIC                   
                                                            EC 17          10,123                  03/04/21   04/21/21    PATRICIA ELECTRIC                   
                                                            EC 18           2,477                  03/12/21   05/05/21    PATRICIA ELECTRIC                   
                                                            EC 21           5,192                  06/01/21   08/27/21    PATRICIA ELECTRIC                   
                                                            EC 22           5,155                  06/01/21   08/27/21    PATRICIA ELECTRIC                   
                                                            EC 25          26,163                  08/02/21   04/13/22    PATRICIA ELECTRIC                   
                                                            EC-01           7,429                  06/30/20   07/28/20    PATRICIA ELECTRIC                   
                                                            EC-02           8,360                  06/30/20   07/28/20    PATRICIA ELECTRIC                   
                                                            EC-03           8,661                  07/13/20   08/17/20    PATRICIA ELECTRIC, INC.             
                                                            EC-04          17,397                  07/17/20   08/26/20    PATRICIA ELECTRIC                   
                                                            EC-05           5,065                  09/09/20   11/05/20    PATRICIA ELECTRIC                   
                                                            EC-06           1,456                  09/24/20   11/09/20    PATRICIA ELECTRIC                   
                                                            EC-07           7,620                  09/24/20   11/09/20    PATRICIA ELECTRIC                   
                                                            EC-08           3,552                  09/24/20   11/09/20    PATRICIA ELECTRIC                   
                                                            EC-09           3,736                  10/22/20   12/30/20    PATRICIA ELECTRIC                   
                                                            EC-10           9,559                  01/08/21   03/10/21    PATRICIA ELECTRIC                   
                                                            EC-12           2,617                  01/13/21   03/16/21    PATRICIA ELECTRIC                   
                                                            EC-13             942                  01/13/21   03/16/21    PATRICIA ELECTRIC                   
                                                            EC-14             823                  01/13/21   03/16/21    PATRICIA ELECTRIC                   
                                                            EC-15           2,158                  01/13/21   03/16/21    PATRICIA ELECTRIC                   
                                                            EC-16               0                  01/28/21   03/24/21    PATRICIA ELECTRIC                   
                                                            EC-19             624                  04/28/21   08/02/21    PATRICIA ELECTRIC                   
                                                            EC-20          10,496                  05/07/21   08/24/21    PATRICIA ELECTRIC                   
                                                            EC-26          20,121                  09/27/21   06/14/22    Patricia Electric                   
                                                            EC-27           3,824                  10/25/21     /  /      Patricia Electric                   
                                                            EC-28           3,469                  01/21/22   11/15/22    Patrica Elec                        
                                                            EC-29          34,988                  01/21/22   11/15/22    Patricia Elec                       
                                                            EC-30           5,173                  02/09/22   11/30/22    Patricia Elec                       
                                                            EC-31           7,001                  02/14/22   02/13/23    Patrica Elec                        
                                                            EC-32           7,186                  05/23/22   04/05/23    Patricia Elec                       
                                                            EC-33           4,107                  05/27/22   04/10/23    Patricia Elec                       
                                                            EC-34          19,075                  07/01/22   05/09/23    Patricia Elec                       
                                                            EC-35          12,875                  10/31/22   11/15/23    Patricia Elec                       
                                                            EC-36          26,231                  12/23/22   12/11/23    Patricia Elec                       
                                                            EC-37           2,800                  01/23/23   11/16/23    PATRICIA ELECTRIC                   
                                                            EC23           28,333                  06/08/21   10/19/21    Patricia Electric                   
                                                            EC24           26,904                  06/08/21   10/19/21    Patricia Electric                   
                                                            GC 29           3,721                  02/12/21   04/13/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC 30          28,830                  03/12/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC 31          18,103                  03/12/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC 32          30,203                  03/16/21   05/13/21    C&S TECHNIICAL RESOURCES, INC.      
                                                            GC 46          15,269                  06/01/21   08/27/21    C&S TECH RES                        
                                                            GC 54          23,860                  08/02/21   04/13/22    C&S TECH RESOURCES, INC             
                                                            GC 55          17,173                  07/02/21   04/13/22    C&S TECH RESOURCES, INC             
                                                            GC 56          12,848                  08/02/21   04/13/22    C&S TECH RESOURCES, INC             
                                                            GC 57          22,388                  08/16/21   04/26/22    C&S TECHICAL RESOURCES, INC         
                                                            GC 58          31,550                  08/16/21   04/26/22    C&S TECHNICAL RESOURCES, INC        
                                                            GC 59          31,550                  08/16/21   04/26/22    C&S TECHNICAL RESOURCES, INC        
                                                            GC 60          31,550                  08/16/21   04/26/22    C&s TECHICAL RESOURCES, INC         
                                                            GC-01           1,100                  06/30/20   07/27/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-02          -9,656                  08/04/20   10/02/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-03           4,894                  08/04/20   10/02/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-04          -6,837                  08/04/20   10/02/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-05               0                  08/04/20   10/02/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-06          -6,100                  08/21/20   10/30/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-07           1,960                  08/21/20   10/30/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-08           5,985                  08/21/20   10/30/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-089          1,741                  09/06/22   06/29/23    C&S Tech Resourse Inc               
                                                            GC-09           1,029                  09/09/20   11/23/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-10           2,344                  09/09/20   11/23/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-11           7,901                  09/11/20   11/24/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-12           2,447                  09/11/20   11/24/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-13          25,197                  09/11/20   11/24/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-14           2,592                  09/11/20   11/24/20    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-15           8,137                  01/08/21   03/29/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-16           2,716                  01/08/21   03/29/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-17           6,486                  02/04/21   03/19/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-18          33,957                  02/04/21   03/19/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-19          15,370                  01/13/21   06/10/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-20          19,478                  01/13/21   06/10/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-21          17,641                  01/13/21   06/10/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-22           3,666                  01/13/21   06/17/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-23           8,112                  01/13/21   06/17/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-24               0                  02/08/21   04/14/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-25           9,606                  01/13/21   06/17/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-26           3,476                  01/28/21   03/19/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-27           3,862                  01/28/21   03/19/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-28          11,011                  01/28/21   03/19/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-33          10,673                  03/30/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-34           5,922                  03/30/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-35          31,560                  03/30/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-36          34,615                  03/30/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-37           9,113                  03/30/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-38           9,143                  03/30/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-39           7,925                  03/30/21   05/06/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-40          12,212                  04/12/21   05/18/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-41           8,215                  04/19/21   05/18/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-42          10,653                  04/26/21   05/18/21    C&S TECHNIVAL RESOURCES, INC.       
                                                            GC-43           7,829                  04/26/21   05/18/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-44          22,986                  04/26/21   05/18/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-45          22,139                  04/28/21   05/19/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-47          24,391                  05/24/21   07/15/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-48          20,437                  05/24/21   07/15/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-49          27,237                  05/24/21   07/15/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-50          14,191                  05/24/21   07/15/21    C&S TECHNICAL RESOURCES, INC.       
                                                            GC-61          30,360                  08/23/21   05/24/22    C&S TECHNICAL RESOURCES, INC        
                                                            GC-62               0                  08/23/21     /  /      C&S TECHNICL RESOURCES, INC         
                                                            GC-62          26,908                  08/23/21   05/24/22    C&S TECHNICAL RESOURCES, INC        
                                                            GC-63          11,667                  09/22/21   11/30/22    C&S Tech Resources, Inc             
                                                            GC-64          29,664                  09/27/21   12/01/22    C&S Tech Resources, Inc             
                                                            GC-65          13,421                  10/08/21     /  /      C&S Tech Resources, Inc             
                                                            GC-66          15,669                  10/08/21   07/26/22    C&S Tech Resources, Inc             
                                                            GC-67          25,771                  10/25/21   12/06/22    C&S Tech Resources, Inc             
                                                            GC-68           8,536                  11/04/21   08/30/22    C&S Tech Resources, Inc             
                                                            GC-69          14,568                  11/04/21   08/30/22    C&S Tech Resources, Inc             
                                                            GC-70          33,614                  11/04/21   08/30/22    C&S Tech Resources, Inc             
                                                            GC-71          15,451                  01/21/22   01/31/23    C&S Tech Resrcs Inc                 
                                                            GC-72          17,894                  01/21/22   01/31/23    C&S Tech Rescrs Inc                 
                                                            GC-73           8,743                  01/21/22   01/31/23    C&S Tech Resrces Inc                
                                                            GC-74          31,232                  01/27/22   02/01/23    C&S Tech Resrces Inc                
                                                            GC-75           4,075                  02/09/22   02/13/23    C&S Tech Resrces Inc                
                                                            GC-76          24,908                  03/21/22   03/29/23    C&S Tech Resources Inc              
                                                            GC-77          29,201                  03/21/22   03/29/23    C&S Tech Resources Inc              
                                                            GC-78          14,789                  04/25/22   05/09/23    C&S TEch Resources Inc              
                                                            GC-79          26,999                  04/25/22   05/09/23    C&S Tech Resources Inc              
                                                            GC-80          24,428                  05/02/22   05/09/23    C&S Tech Resources Inc              
                                                            GC-81          26,240                  05/02/22   05/09/23    C&S Tech Resources Inc              
                                                            GC-82           4,012                  05/02/22   03/28/23    C&S TEch Resources Inc              
                                                            GC-83           9,095                  05/12/22   04/18/23    C&S Tech Resources Inc              
                                                            GC-84         175,670                  05/12/22   12/14/23    C&S Tech Resources Inc              
                                                            GC-85          27,046                  06/16/22   04/03/23    C&S Tech Resources Inc              
                                                            GC-86          10,580                  06/16/22   04/03/23    C&S Tech Resources Inc              
                                                            GC-87          21,042                  08/01/22     /  /      C&S Technical ResourcesInc          
                                                            GC-87          21,042                  08/01/22   09/26/23    C&S Tech Resources                  
                                                            GC-88           9,391                  08/22/22   12/13/23    C&S Tech Resources Inc              
                                                            GC-90           9,680                  10/17/22   12/19/23    C&S Tech Resources Inc              
                                                            GC-91          20,722                  10/31/22   12/13/23    C&S Tech Resources Inc              
                                                            GC-92          34,732                  01/23/23   12/14/23    C&S TECHNICAL RESOURCES INC         
                                                            GC-93          34,076                  01/23/23   12/14/23    C&S TECHNICAL RESOURCES INC         
                                                            GC51           16,363                  06/08/21   11/02/21    C&S Tech. Resources                 
                                                            GC52           23,318                  06/08/21   11/02/21    C&S Technical Resources             
                                                            GC53           15,183                  06/28/21   03/16/22    C&S Technical Resources             
                                                            MC 12          15,697                  03/04/21   04/21/21    AIRSIDE TECHNOLOGY CORP.            
                                                            MC 13          33,148                  03/04/21   04/21/21    AIRSIDE TECHNOLOGY CORP.            
                                                            MC 15           2,528                  06/01/21   08/27/21    AIRSIDE TECH                        
                                                            MC 17          33,064                  08/02/21   04/13/22    AIRSIDE TECH CORP                   
                                                            MC 18          29,235                  08/23/21   05/24/22    AIRSIDE TECHNOLOGY CORPORATION      
                                                            MC-001         29,400                  06/30/20     /  /      AIRSIDE TECHNOLOGY CORP.            
                                                            MC-002         18,882                  06/30/20     /  /      AIRSIDE TECHNOLOGY CORP.            
                                                            MC-003              0                  08/04/20   10/05/20    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-004         -2,665                  08/04/20   10/05/20    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-005          3,222                  09/11/20   11/05/20    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-006          8,743                  01/08/21   03/10/21    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-007          6,969                  10/22/20   12/30/20    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-008          1,270                  01/13/21   03/16/21    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-009         13,604                  01/13/21   03/16/21    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-010              0                  01/28/21   03/24/21    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-011          2,621                  01/28/21   03/24/21    AIRSIDE TECHNOLOGY CORP.            
                                                            MC-14           4,855                  04/28/21   08/02/21    AIRSIDE TECHNOLGY CORP.             
                                                            MC-19          10,521                  08/23/21   05/24/22    AIRSIDE TECHNOLOGY CORPORATION      
                                                            MC-20           4,625                  09/23/21   11/30/22    Airside Tech Corp                   
                                                            MC-21           3,315                  10/08/21   07/19/22    Airside Tech Corp                   
                                                            MC-22           8,822                  10/25/21   12/06/22    Airside Tech Corp                   
                                                            MC-23          21,007                  12/09/21   12/16/22    Airside Tech Corp                   
                                                            MC-24          11,716                  01/21/22   11/15/22    Airside Tech Corp                   
                                                            MC-25           4,481                  02/14/22   02/13/23    Airside Tech Corp                   
                                                            MC-26          19,102                  03/02/22   01/10/23    Airside Tech Corp                   
                                                            MC-27          -1,380                  04/01/22   02/22/23    Airside Tech Corp                   
                                                            MC-28          11,349                  05/27/22   04/10/23    Airside Tech Corp                   
                                                            MC16            4,290                  06/28/21   11/16/21    Airside Technology                  
                                                            PC 11          21,755                  08/02/21   04/13/22    ERIE MECH CONTRACTORS, INC          
                                                            PC-01               0                  07/17/20   08/26/20    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-02           3,242                  08/21/20   10/29/20    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-03           2,352                  09/24/20   11/09/20    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-04          11,136                  01/13/21   03/16/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-05           8,371                  01/13/21   03/16/21    ERIE MECHNIACL CONTRACTORS, INC.    
                                                            PC-06               0                  02/04/21   03/26/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-07             703                  01/13/21   03/16/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-08           2,502                  04/12/21   07/12/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-09           4,621                  04/19/21   07/29/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-10          19,120                  04/28/21   08/02/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-12           5,547                  08/23/21   05/24/22    ERIE MECHANICAL CONSTRUCTORS, INC   
                                                            PC-13           4,058                  12/09/21   12/16/22    Erie Mech Contr Inc                 
                                                            PC-14           4,088                  01/21/22   11/15/22    Erie Mech Contrs Inc                
                                                            PC-15           3,891                  02/09/22   11/30/22    Erie Mech Contrs Inc                
                                                            PC-16           5,097                  02/14/22   02/13/23    Eric Mech Contrs Inc                
                                                            PC-17           1,095                  04/25/22   04/17/23    Erie Mech Contrs Inc                
                                                            PC-18           5,130                  05/02/22   03/07/23    Erie Mech Contrs Inc                
                                                            PC-19          11,895                  05/12/22   03/13/23    Eric Mech Contrs Inc                
                                                            PC-20           8,517                  08/22/22   04/18/23    Erie Mech Contrs Inc                
                                                            SC 05            -979                  03/04/21   04/29/21    CUNNINGHAM EXCAVATION, INC.         
                                                            SC 07         -14,182                  08/02/21   04/13/22    CUNNINGHAM EXCAVATION, INC          
                                                            SC-01               0                  07/17/20   09/10/20    CUNNINGHAM EXCAVATION, INC.         
                                                            SC-02         -21,209                  08/04/20   10/02/20    CUNNIBGHAM EXCAVATION, INC.         
                                                            SC-03          27,275                  08/21/20   10/30/20    CUNNINGHAM EXCAVAING, INC.          
                                                            SC-04               0                  01/28/21   03/19/21    CUNNINGHAM EXCAVATION, INC.         
                                                            SC-06          12,655                  03/12/21   05/06/21    CUNNIINGHAM EXCAVATING, INC.        
                                                            SC-08          24,639                  09/23/21   11/30/22    Cunningham Excavation, Inc          
                                                            SC-09          27,356                  09/23/21   11/30/22    Cunningham Excavations, Inc         
                                                            SC-10          34,042                  09/23/21   11/30/22    Cunningham Exacation, Inc           
                                                            SC-11           2,830                  10/08/21   07/19/22    Cunningham Excavation, Inc          
                                                            SC-12          34,216                  12/09/21   09/22/22    Cunningham Excavation Inc           
                                                            SC-13          32,508                  12/09/21   09/22/22    Cunningham Excavation Inc           
                                                            SC-14          16,561                  12/09/21   09/22/22    Cunningham Excavation Inc.          
                                                            SC-15             875                  08/15/22   05/22/23    Cunningham Excavation Inc           
                                                            SC-16           2,436                  10/31/22   12/13/23    Cunningham Excavation Inc           
                                                            SC-17           8,727                  12/23/22   12/12/23    Cunningham Excavation Inc           
 

          Fayetteville Elementary:
95-1374   Reconstruction               0-004-003  05/31/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1422   Reconstruction               0-004-004  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0588   Additions and Alterations    0-004-005  03/26/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0734   Reconstruction               0-004-006  03/22/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0758   Reconstruction               0-004-007  05/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2               661                  02/05/02   04/05/02    Patricia Elec.                      
                                                            GC-5           11,391                  02/05/02   04/05/02    Bette & Cring                       
                                                            GC-6           46,162                  02/05/02   04/05/02    Bette & Cring                       
 
01-0362   Reconstruction               0-004-008  06/28/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-22          -3,100                  01/06/05   01/25/05    Bette & Cring                       
 
05-1394   Reconstruction               0-004-010  09/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1528   Reconstruction               0-004-011  11/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AB-4           35,194                  01/07/09   03/05/09    TWO BROTHERS CONTRACTING INC.       
                                                            E-2            19,260                  01/23/09   05/20/09    EDGELINE ELECTRIC CORP.             
                                                            E-8               512                  05/29/09   08/06/09    EDGELINE ELECTRIC CORP              
                                                            GC-12           1,121                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-18           4,611                  11/19/09   02/04/10    PAC & ASSOCIATES                    
                                                            R-3               456                  03/13/09   06/10/09    KASCON LLC                          
 
07-1408   Reconstruction               0-004-012  07/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3             3,223                  12/16/09   02/01/10    JOHNSON CONTROLS                    
                                                            GC-3                0                  10/22/09   12/28/09    JD TAYLOR CONSTRUCTION              
                                                            GC-7              235                  10/22/09   12/28/09    JD TAYLOR CONSTRUCTION              
 
11-0085   Reconstruction               0-004-013  10/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-0008          4,742                  11/19/12   08/12/13    J&E ELECTRIC                        
                                                            E-0010          1,481                  03/05/13   07/17/13    J&E ELECTRIC                        
                                                            E-0011            606                  03/05/13   07/17/13    J&E ELECTRIC                        
                                                            E-0014          1,387                  03/05/13   07/17/13    J&E ELECTRIC                        
                                                            E-0015            755                  03/05/13   07/17/13    J&E ELECTRIC                        
                                                            E-0016          1,221                  03/05/13   07/17/13    J&E ELECTRIC                        
                                                            E-0018            788                  05/03/13   07/17/13    J & E Electric                      
                                                            E-0021            602                  05/03/13   07/17/13    J & E Electric                      
                                                            E-0023            538                  07/10/13   08/06/13    J & E Electric                      
                                                            E-0027          1,378                  08/01/13   12/18/13    J & E Electric                      
                                                            E-0028            333                  08/01/13   12/18/13    J & E Electric                      
                                                            E-0032          1,654                  09/09/13   09/19/13    J & E Electric                      
                                                            E-0033          1,070                  09/09/13   09/19/13    J&E Electric                        
                                                            E-0034            688                  09/09/13   09/19/13    J&E Electric                        
                                                            E-0035            458                  10/01/13   10/16/13    J& E Electric                       
                                                            E-0038            868                  10/01/13   10/16/13    J & E Electric                      
                                                            E-0039          2,226                  01/02/14   01/27/14    J & E Electric                      
                                                            GC-0003         3,961                  08/29/12   12/21/12    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0004        14,705                  09/25/12   01/25/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0007         3,485                  11/19/12   03/07/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0008         2,315                  11/19/12   03/07/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0010        11,384                  11/19/12   03/07/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0016        11,352                  12/23/12   09/13/13    J. D. Taylor Construction Corp.     
                                                            GC-0017         1,320                  03/05/13   05/31/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0018           275                  03/05/13   05/31/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0020           275                  03/05/13   05/31/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0026         2,590                  03/05/13   05/31/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0027         2,770                  03/05/13   05/31/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0028        -1,221                  03/25/13   06/14/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0029           370                  03/25/13   06/14/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0030        -6,000                  03/25/13   06/14/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0033         5,945                  04/03/13     /  /      J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0041         9,750                  08/01/13     /  /      J.D. Taylor Construction Corp.      
                                                            GC-0043         1,112                  08/01/13   08/09/13    J. D. Taylor Construction Corp.     
                                                            GC-0044        26,908                  08/01/13   08/09/13    J.D. Taylor Construction Corp.      
                                                            GC-0045         4,552                  08/01/13   11/25/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0047           316                  08/01/13   08/09/13    J.D. Taylor Construction Corp.      
                                                            GC-0060         2,050                  10/01/13   10/16/13    J.D. Taylor Construction Corp.      
                                                            GC-0061        11,972                  10/15/13   11/13/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0067           283                  10/15/13   11/13/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0068         1,565                  10/15/13   11/13/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0072         1,068                  11/01/13   12/04/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0075           710                  11/01/13   12/04/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0076         1,792                  11/01/13   12/04/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-0078           235                  01/16/15   02/03/15    J.D. Taylor Construction Corp.      
                                                            GC-0079         2,674                  01/16/15   02/03/15    J.D. Taylor Construction Corp.      
                                                            GC-012         15,745                  12/20/12   04/16/13    J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-013          1,320                  03/05/13     /  /      J.D. TAYLOR CONSTRUCTION CORP       
                                                            GC-050          2,477                  09/09/13   09/13/13    J.D. Taylor Construction Inc.       
                                                            GC-055          2,568                  09/09/13   09/13/13    J.D. Taylor Construction Corp.      
                                                            GC-057         13,439                  10/01/13   10/10/13    J.D. Taylor Construction Corp.      
                                                            H-0003            660                  05/16/13   07/17/13    Airside Technology Corporation      
                                                            H-0004            808                  05/03/13   07/17/13    Airside Technology Corporation      
                                                            H-0005            198                  08/01/13   12/18/13    Airside Technology Corporation      
                                                            H-0007         -6,017                  11/01/13   02/20/14    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-0008            924                  11/01/13   12/04/13    AIRSIDE TECHNOLOGY CORPORATION      
                                                            H-0010         10,002                  11/07/13   02/03/14    Airside Technology Corporation      
                                                            H-0011          4,134                  11/07/13   07/03/14    AIRSIDE TECHNOLOGY CORPORATION      
                                                            P-0005          3,895                  11/19/12   08/12/13    GREEN PLUMBING INC                  
                                                            P-0008          1,208                  03/25/13   07/17/13    GREEN PLUMBING INC                  
                                                            P-0009          1,626                  03/25/13   07/17/13    GREEN PLUMBING INC                  
                                                            P-0010            123                  03/25/13   07/17/13    GREEN PLUMBING INC                  
                                                            P-0012            717                  05/03/13   07/17/13    Green Plumbing, Inc.                
                                                            P-0016          1,177                  11/01/13   12/04/13    GREEN PLUMBING INC                  
 
13-1070   Reconstruction               0-004-014  05/09/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1245   Reconstruction               0-004-015  06/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00007         -31,144                  09/10/15   09/18/15    Diamond & Thiel Construction Co.    
                                                            00011              63                  09/16/15   10/07/15    Diamond & Thiel Construction Co.    
                                                            00019             862                  10/22/15   11/17/15    Diamond & Thiel Construction Co.    
                                                            2                 898                  07/13/15   08/26/15    Diamond & Thiel Construction Co.    
                                                            31                388                  12/16/15   01/08/16    Diamond & Thiel Construction Co.    
                                                            9               3,461                  12/31/15   01/11/16    Knapp Electric, Inc.                
 
14-1696   Reconstruction               0-004-016  07/21/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           3,890                  01/10/17   01/23/17    Elmer W. Davis, Inc.                
                                                            GC-03          -2,596                  01/10/17   01/23/17    Elmer W. Davis, inc.                
 
16-0526   Reconstruction               0-004-017  05/23/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0243   Reconstruction               0-004-018  05/24/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           9,703                  07/24/19   07/25/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
 
17-0545   Reconstruction               0-004-019  03/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          11,140                  12/21/18   06/06/19    RIDLEY ELECTRIC CO., INC.           
                                                            GC-01          16,785                  12/21/18   02/08/19    MCGINNIS NELSON CONSTRUCTION        
 
18-2144   Reconstruction               0-004-020  08/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2192   Reconstruction               0-004-021  08/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -11,055                  01/08/21   03/10/21    RIDLEY ELECTRIC CO.,INC.            
 
20-1178   Reconstruction               0-004-022  01/28/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0285   Reconstruction               0-004-023  10/27/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mott Road Elementary:
92-0904   Reconstruction               0-006-003  05/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0711   Additions and Alterations    0-006-004  03/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1423   Reconstruction               0-006-005  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0735   Additions and Alterations    0-006-006  03/22/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1               914                  05/01/08     /  /      BURNS ELECTRIC                      
                                                            H-1             8,235                  05/01/08     /  /      AIRTECH H & AC SYSTEMS INC.         
 
99-0757   Additions and Alterations    0-006-007  05/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-8           -2,900                  07/01/02   07/05/02    Bette & Cring                       
 
01-0363   Reconstruction               0-006-008  06/28/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-20           5,854                  10/07/04   10/14/04    Bette & Cring                       
 
05-1395   Reconstruction               0-006-009  09/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1529   Reconstruction               0-006-010  11/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-5               456                  04/03/09   07/24/09    KASCON LLC                          
 
07-1409   Reconstruction               0-006-011  07/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-13         355,000                  03/01/10   05/26/10    JD TAYLOR CONSTRUCTION              
                                                            GC-16           6,420                  09/30/10   12/14/10    JD TAYLOR CONSTRUCTION              
                                                            GC-17           9,326                  12/03/10   01/07/11    JD TAYLOR CONSTRUCTION              
                                                            GC-18           3,248                  12/03/10   01/07/11    JD TAYLOR CONSTRUCTION              
                                                            GC-19             -19                  07/05/11   09/09/11    JD TAYLOR CONSTRUCTION              
 
10-0465   Reconstruction               0-006-012  02/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0657   Additions and Alterations    0-006-013  02/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-1            61,541                  09/29/11   11/23/11    CUNNINGHAM EXCAVATION INC           
                                                            S-2             8,690                  09/29/11   11/23/11    CUNNINGHAM EXCAVATION INC           
                                                            S-3             8,539                  11/07/11   01/10/12    CUNNINGHAM EXCAVATION INC           
                                                            S-4              -200                  05/18/12   10/05/12    CUNNINGHAM EXCAVATION INC           
 
12-0863   Reconstruction               0-006-014  04/11/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         122,356                  11/07/13   12/09/13    Two Brothers Contracting, Inc.      
 
13-0020   Reconstruction               0-006-015  02/13/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-002        -13,000                  06/16/14   10/03/14    Bagnall Electric Inc                
                                                            EC-003          2,366                  10/02/14   10/08/14    Bagnall Electric, Inc.              
                                                            EC-004          3,329                  10/02/14   10/08/14    Bagnall Electric, Inc.              
                                                            EC-009            285                  11/16/15   01/05/16    Bagnall Electric, Inc.              
                                                            EC-01             378                  06/16/14   07/10/14    Bagnall Electric, Inc.              
                                                            GC-01           8,379                  08/25/14   10/09/14    McGinnis Nelson Construction        
                                                            GC-02           6,346                  11/26/14   02/06/15    McGinnis Nelson Construction        
                                                            GC-03           7,203                  09/22/14   09/26/14    McGinnis Nelscon Construction       
                                                            GC-05           1,270                  12/05/14   12/19/14    McGinnis Nelson Construction        
                                                            GC-06            -462                  12/26/14   02/05/15    McGinnis Nelson Construction        
                                                            GC-07             787                  12/26/14   02/05/15    McGinnis Nelson Construction        
                                                            GC-08             316                  04/10/15   07/09/15    McGinnis Nelson Construction        
                                                            GC-09           3,993                  04/10/16   06/22/16    McGinnis Nelson Construction        
                                                            GC-11           5,114                  09/10/15   10/28/15    McGinnis Nelson Construction        
                                                            GC-13           4,264                  09/10/15   10/28/15    McGinnis Nelson Construction        
                                                            GC-14          13,755                  09/10/15   10/28/15    McGinnis Nelson Construction        
                                                            GC-15           2,222                  09/10/15   10/28/15    McGinnis Nelson Construction        
                                                            GC-16          13,322                  09/10/15   10/28/15    McGinnis Nelson Construction        
                                                            GC-17           7,285                  09/10/15   10/28/15    McGinnis Nelson Construction        
                                                            GC-19           4,464                  10/22/15   01/27/16    McGinnis Nelson Construction        
                                                            GC-20           1,373                  11/06/15   12/02/15    McGinnis Nelson Construction        
                                                            GC-21           1,652                  12/09/15   12/28/15    McGinnis Nelson Construction        
                                                            HC-01        -315,400                  10/02/14   10/08/14    Edward Joy Company                  
                                                            HC-02           2,627                  11/25/14   02/06/15    Edward Joy Company                  
                                                            HC-04           2,963                  08/05/15   08/31/15    Edward Joy Company                  
                                                            HC-05           2,712                  08/05/15   08/31/15    Edward Joy Company                  
                                                            HC-06           1,493                  07/13/15   08/14/15    Edward Joy Company                  
                                                            HC-08           3,381                  08/18/15   08/31/15    Edward Joy Company                  
                                                            HC-09           7,451                  08/18/15   08/31/15    Edward Joy Company                  
                                                            HC-10          -1,500                  09/10/15   10/28/15    Edward Joy Company                  
                                                            HC-11           1,523                  11/06/15   12/02/15    Edward Joy Company                  
                                                            HC-12             304                  11/16/15   01/05/16    Edward joy Compnay                  
                                                            HC-13             890                  11/16/15   01/05/16    Edward Joy Company                  
                                                            HC-14           2,207                  11/16/15   01/05/16    Edward Joy Company                  
                                                            HC-18             185                  12/17/15   01/19/16    EDWARD JOY COMPANY D/B/A JOY PROCESS
                                                            HC-20           2,350                  12/31/15   01/22/16    Edward Joy Company                  
                                                            HC-21           1,040                  02/26/16   03/07/16    Edward Joy Company                  
                                                            PC-01             376                  12/31/15   01/11/16    Brosh Mechanical                    
                                                            PC-02           5,190                  12/31/15   01/11/16    Brosh Mechanical                    
                                                            PC-03             604                  02/26/16   03/07/16    Brosch Mechanical                   
                                                            RC-04           2,409                  10/30/14   11/05/14    Diamond Roofing Co., Inc.           
                                                            RC-15           8,667                  12/31/15   01/11/16    Diamond Roofing Co. Inc.            
 
13-1246   Reconstruction               0-006-016  06/16/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00005           3,355                  10/01/15   11/17/15    Knapp Electric, Inc.                
                                                            00015              63                  09/16/15   10/07/15    Diamond & Thiel Construction Co.    
                                                            00021             549                  10/22/15   11/17/15    Diamond & Thiel Construction Co.    
                                                            28                353                  12/16/15   01/08/16    Diamond & Theil Construction        
                                                            8               3,514                  12/31/15   01/11/16    Knapp Electric, Inc.                
 
13-1071   Reconstruction               0-006-017  05/09/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0952   Reconstruction               0-006-019  03/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W-01           97,900                  06/03/19   07/02/19    FLOWER CITY GLASS                   
                                                            W-02                0                  06/30/20   10/20/20    FLOWER CITY GLASS                   
 
18-2145   Reconstruction               0-006-020  08/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1302   Reconstruction               0-006-021  05/28/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          23,715                  09/25/20   11/10/20    MYRIAD CONSTRUCTION                 
 
23-0143   Reconstruction               0-006-022  12/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fayetteville-Manlius High School:
92-0905   Reconstruction               0-007-008  05/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0712   Alterations                  0-007-009  03/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1424   Reconstruction               0-007-010  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1509   Additions and Alterations    0-007-011  06/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0736   Additions and Alterations    0-007-012  03/22/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-5            5,756                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            GC-5           -1,855                  05/01/08     /  /      MURNANE BUILDING CONTRACTORS        
                                                            LK-1            2,850                  05/01/08     /  /      FACILITIES EQUIPMENT & SERVICES     
                                                            P-1             4,123                  05/01/08     /  /      WADSWORTH MECHANICAL, INC.          
 
99-0761   Reconstruction               0-007-013  05/05/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0994   Additions and Alterations    0-007-014  09/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1                 0                  07/02/02   07/15/02    Binder Elec.                        
                                                            GC-1            3,221                  08/19/02   09/04/02    Maross Const.                       
                                                            S-1            19,226                  07/16/02   04/17/03    Leitz Enterprises                   
                                                            S-2            19,360                  07/16/02   04/17/03    Leitz Enterprises                   
                                                            S-3            40,927                  12/20/02   11/10/03    Leitz Enterprises                   
                                                            S-4             9,974                  12/20/02   03/28/03    Leitz Enterprises                   
                                                            S-5            26,984                  12/20/02   06/03/03    Leitz Enterprises                   
                                                            S-6             6,957                  11/25/03   12/05/03    Leitz Enterprises                   
 
01-0364   Additions and Alterations    0-007-016  06/28/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            -1,322                  11/25/03   11/29/05    Ridley Electric                     
                                                            E-5                 0                  03/15/04   04/23/04    Ridley Electric                     
                                                            E-8                 0                  03/24/04   04/23/04    Ridley Electric                     
                                                            E-9                 0                  07/26/04   08/02/04    Ridley Electric                     
                                                            GC-1                0                  10/23/03   10/24/03    Bette & Cring                       
                                                            GC-12           3,216                  03/10/04   03/15/04    Bette & Cring                       
                                                            GC-16           1,182                  03/24/04   04/06/04    Bette & Cring                       
                                                            GC-17           8,289                  07/22/04   09/29/04    Bette & Cring                       
                                                            GC-2                0                  10/23/03   10/24/03    Bette & Cring                       
                                                            GC-24           1,685                  04/18/05   06/14/05    Bette Cring                         
                                                            GC-25           4,228                  04/29/05   06/14/05    Bette Cring                         
                                                            GC-26          10,155                  07/01/05   07/21/05    Bette Cring                         
                                                            GC-3                0                  10/23/03   10/24/03    Bette & Cring                       
                                                            GC-4                0                  10/23/03   10/24/03    Bette & Cring                       
                                                            GC-5            9,619                  10/23/03   10/24/03    Bette & Cring                       
                                                            GC-6          222,488                  10/23/03   10/24/03    Bette & Cring                       
                                                            GC-7           42,766                  03/01/04   03/04/04    Bette & Cring                       
                                                            H-2                 0                  06/29/04   07/06/04    EF Galvin                           
                                                            P-1            -2,968                  06/22/04   06/30/04    Bellucci Enterprises                
                                                            P-5              -271                  07/26/04   08/02/04    Bellucci Enterprises                
 
05-1396   Reconstruction               0-007-019  09/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1530   Additions and Alterations    0-007-020  11/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AB-1          172,035                  09/23/08   02/26/09    TWO BROTHERS CONTRACTING, INC.      
                                                            AB-11           3,836                  08/10/09   09/16/09    TWO BROTHERS CONTRACTING INC        
                                                            AB-2           20,282                  10/17/08   04/21/09    TWO BROTHERS CONTRACTING, INC.      
                                                            AB-8            1,166                  01/07/09   03/03/09    TWO BROTHERS CONTRACTING INC.       
                                                            E-1             4,953                  11/20/08   07/09/09    EDGELINE ELECTRIC CORP.             
                                                            E-4            11,301                  01/07/09   03/05/09    EDGELINE ELECTRIC CORP.             
                                                            E-7             4,920                  05/29/09   08/06/09    EDGELINE ELECTRIC CORP              
                                                            GC-1           73,803                  10/17/08   04/21/09    PAC & ASSOCIATES                    
                                                            GC-10          70,245                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-11           8,101                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-17          15,781                  11/19/09   02/04/10    PAC & ASSOCIATES                    
                                                            GC-2           17,364                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-20          -6,103                  06/08/10   08/05/10    PAC & ASSOCIATES                    
                                                            GC-4           12,478                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            GC-9            2,347                  01/23/09   05/22/09    PAC & ASSOCIATES                    
                                                            H-2             6,611                  10/26/09   11/20/09    AIRSIDE TECHNOLOGY                  
                                                            H-3            -1,524                  01/04/10   02/25/10    AIRSIDE TECHNOLOGY                  
                                                            P-1            -2,000                  11/20/08   07/09/09    C&S PLUMBING & HEATING              
                                                            R-4               570                  04/03/09   07/24/09    KASCON LLC                          
 
07-1410   Reconstruction               0-007-021  07/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1                 0                  12/16/09   02/01/10    JOHNSON CONTROLS                    
                                                            E-2             5,641                  12/16/09   02/01/10    JOHNSON CONTROLS                    
                                                            GC-1           17,574                  08/19/09   09/15/09    JD TAYLOR CONSTRUCTION              
                                                            GC-10           6,667                  01/19/10   05/27/10    JD TAYLOR CONSTRUCTION              
                                                            GC-12           7,188                  02/04/10   05/28/10    JD TAYLOR CONSTRUCTION              
                                                            GC-2                0                  10/22/09   12/28/09    JD TAYLOR CONSTRUCTION              
                                                            GC-4                0                  10/22/09   12/28/09    JD TAYLOR CONSTRUCTION              
                                                            GC-7           14,386                  01/06/10   05/10/10    JD TAYLOR CONSTRUCTION              
                                                            GC-8           12,236                  01/19/10   05/27/10    JD TAYLOR CONSTRUCTION              
                                                            GC-9           19,264                  01/19/10   05/27/10    JD TAYLOR CONSTRUCTION              
 
09-1383   Additions and Alterations    0-007-022  06/11/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            9,517                  11/01/10   12/01/10    JD TAYLOR CONSTRUCTION              
                                                            GC-2            2,150                  04/04/11   04/21/11    JD TAYLOR CONSTRUCTION              
 
10-0466   Reconstruction               0-007-023  02/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0750   Reconstruction               0-007-025  02/28/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0086   Reconstruction               0-007-026  10/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-0036         3,807                  05/03/13   11/22/13    J.D. Taylor Construction Corp.      
                                                            GC-0073         1,897                  11/01/13   12/04/13    J.D. TAYLOR CONSTRUCTION CORP       
 
11-1242   Reconstruction               0-007-028  01/28/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            GC-01          11,224                  09/06/13   09/13/13    FAHS Construction Group             
                                                            GC-02          11,023                  09/06/13   09/13/13    FAHS Construction Group             
                                                            GC-03           3,183                  09/06/13   09/13/13    FAHS Construction Group             
                                                            GC-04           1,207                  09/06/13   09/13/13    FAHS Construction Group             
                                                            GC-05           8,254                  09/06/13   09/13/13    FAHS Construction Group             
                                                            GC-06          32,504                  09/06/13   09/13/13    FAHS Construction Group             
                                                            GC-07         -10,233                  09/06/13   09/13/13    FAHS Construction Group             
                                                            GC-09          24,544                  01/02/14   02/03/14    FAHS Construction Group             
                                                            GC-10          23,694                  01/02/14   01/31/14    FAHS Construction Group             
 
13-0022   Reconstruction               0-007-029  02/13/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-005         31,923                  11/28/14   02/06/15    Bagnall Electric, Inc.              
                                                            EC-006          7,253                  08/18/15   08/31/15    Bagnall Electric Inc.               
                                                            EC-007          4,481                  10/01/15   11/03/15    Bagnall Electric, Inc.              
                                                            EC-008         22,275                  10/01/15   11/03/15    Bagnall Electric, Inc.              
                                                            EC-010          9,489                  02/08/16   02/18/16    Bagnall Electric, Inc.              
                                                            EC-011          1,495                  01/21/16   02/04/16    Bagnall Electric, Inc.              
                                                            GC-04           1,199                  11/25/14   02/06/15    McGinnis Nelson Construction        
                                                            GC-12          25,231                  09/10/15   10/28/15    McGinnis Nelson Construction        
                                                            HC-03           4,556                  11/25/14     /  /      Edward Joy Company                  
                                                            HC-15           5,363                  12/09/15   12/28/15    Edward Joy Company                  
                                                            HC-16           1,394                  12/17/15   01/12/16    EDWARD JOY COMPANY D/B/A JOY PROCESS
                                                            HC-19             775                  12/24/15   01/25/16    EDWARD JOY COMPANY D/B/A JOY PROCESS
                                                            RC-01           2,600                  10/02/14   10/08/14    Diamond Roofing Co. Inc.            
                                                            RC-02          -2,376                  10/30/14   11/05/14    Diamond Roofing Co., Inc.           
                                                            RC-03          15,036                  10/30/14   11/05/14    Diamond Roofing Co., Inc.           
                                                            RC-05          -1,585                  10/30/14   11/05/14    Diamond Roofing Co., Inc.           
                                                            RC-06             424                  10/30/14   11/05/14    Diamond Roofing Co., Inc.           
                                                            RC-07             714                  12/26/14   02/05/15    Diamond Roofing Co., Inc.           
                                                            RC-08         -16,446                  12/26/14   02/05/15    Diamond Roofing Co., Inc.           
                                                            RC-09           2,408                  12/26/14   02/05/15    Diamond Roofing Co., Inc.           
                                                            RC-10          -3,990                  09/10/15   10/28/15    Diamond Roofing Co. Inc.            
                                                            RC-14           3,347                  10/22/15   01/27/16    Diamond Roofing Co. Inc.            
                                                            SC-01           5,485                  08/25/14   10/09/14    McGinnis Nelson Construction        
                                                            SC-03           2,875                  12/05/14   12/15/14    McGinnis Nelson Construction        
                                                            SC-04           6,028                  12/26/14   02/05/15    McGinnis Nelson Construction        
                                                            SC-05           3,934                  01/14/15   02/03/15    McGinnis Nelson Constuction         
                                                            SC-06           8,284                  02/17/15   02/19/15    McGinnis Nelson Construction        
 
13-1478   Reconstruction               0-007-030  11/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00001           2,269                  09/10/15   09/18/15    Airside Technology Corporation      
                                                            00002           7,664                  09/10/15   09/18/15    Airside Technology Corporation      
                                                            00005           6,430                  09/10/15   09/18/15    Diamond & Thiel Construction Co.    
                                                            00006           1,542                  09/10/15   09/18/15    Diamond & Thiel Construction Co.    
                                                            00006           1,999                  10/01/15   11/19/15    Knapp Electric, Inc.                
                                                            00009          12,425                  09/10/15   09/18/15    Diamond & Thiel Construction Co.    
                                                            00010           2,097                  10/01/15   11/19/15    Diamond & Thiel Construction Co.    
                                                            00012             126                  09/16/15   10/01/15    Diamond & Thiel Construction Co.    
                                                            00016           3,462                  10/01/15   04/22/16    Diamond & Thiel Construction Co.    
                                                            00017          -2,043                  10/22/15   11/19/15    Diamond & Thiel Construction Co.    
                                                            00018           5,204                  10/22/15   11/19/15    Diamond & Thiel Construction Co.    
                                                            00024             140                  10/22/15   11/19/15    Diamond & Thiel Construction Co.    
                                                            00026             750                  10/22/15   04/26/16    Diamond & Thiel Construction Co.    
                                                            1              19,183                  07/13/15   08/11/15    Diamond & Theil Construction Co.    
                                                            1              67,296                  07/13/15   08/11/15    Knapp Electric Inc.                 
                                                            13              2,006                  12/31/15   01/12/16    Knapp Electric, Inc.                
                                                            14              4,187                  12/31/14   01/12/16    Knapp Electric, Inc.                
                                                            15              2,681                  12/31/15   01/12/16    Knapp Electric, Inc.                
                                                            2               5,898                  08/06/15   08/26/15    Knapp Electric Inc.                 
                                                            4               1,383                  08/18/15   09/01/15    Diamond & Thiel Construction Co.    
                                                            7               3,489                  12/31/15   01/12/16    Knapp Electric, Inc.                
 
13-1072   Reconstruction               0-007-031  05/09/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0443   Reconstruction               0-007-032  11/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0007   Reconstruction               0-007-034  07/25/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          10,421                  08/30/17   09/06/17    Patricia Electric, Inc.             
 
18-0344   Additions and Alterations    0-007-035  12/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001 PC A       10,928                  09/25/19   09/30/19    BURNS BROTHERS                      
                                                            001A-PCA        8,196                  01/25/21   04/05/21    BURNS BROTHERS                      
                                                            002 GC A        4,958                  12/20/19   01/28/20    BETTE & CRING                       
                                                            002 PC A        7,080                  10/11/19   10/18/19    BURNS BROTHERS                      
                                                            003 GC A        7,714                  12/20/19   01/28/20    BETTE & CRING                       
                                                            003PC-A         6,489                  10/21/19   10/25/19    BURNS BROTHERS                      
                                                            004 GC A        2,976                  12/20/19   01/28/20    BETTE & CRING                       
                                                            004PC-A         1,457                  10/21/19   10/25/19    BURNS BROTHERS                      
                                                            005 GC A        1,476                  12/20/19   01/28/20    BETTE & CRING                       
                                                            006 GC A        1,021                  12/20/19   01/28/20    BETTE & CRING                       
                                                            006 PC A          890                  12/20/19   01/10/20    BURNS BROTHERS                      
                                                            007 GC A        2,645                  12/20/19   01/28/20    BETTE & CRING                       
                                                            007 PC A        9,317                  12/14/20   02/22/21    BURNS BROS CONTRACTORS              
                                                            008 GC A        1,312                  12/20/19   01/28/20    BETTE & CRING                       
                                                            009A-GCA        2,453                  01/25/21   04/06/21    BETTE & CRING                       
                                                            012 GC A        9,491                  12/14/20   03/05/21    BETTE & CRING                       
                                                            013 GC A       20,255                  12/14/20   03/05/21    BETTE & CRING                       
                                                            02 EC A         6,493                  08/30/19   09/03/19    J&E ELECTRIC                        
                                                            03 EC A        21,177                  09/25/19   09/30/19    J&E ELECTRIC                        
                                                            04 EC A         1,948                  09/25/19   09/30/19    J&E ELECTRIC                        
                                                            05 EC A         5,811                  10/11/19   10/18/19    J&E ELECTRIC                        
                                                            06 EC A         5,891                  10/11/19   10/18/19    J&E ELECTRIC                        
                                                            09 EC A         4,317                  12/20/19   01/10/20    J&E ELECTRIC                        
                                                            13 EC A         5,303                  12/20/19   01/10/20    J&E ELECTRIC                        
                                                            13A-ECA         3,500                  01/25/21   04/05/21    J&E ELECTRIC                        
                                                            14A-ECA        -3,874                  01/25/21   04/05/21    J&E ELECTRIC                        
                                                            EC-002 A       -1,405                  12/14/20   02/22/21    J&E ELECTRIC                        
                                                            EC-003         -2,334                  07/05/19   07/10/19    J&E ELECTRIC                        
                                                            EC-004 A      -10,989                  09/25/19   09/30/19    J&E ELECTRIC                        
                                                            EC-005A        -8,156                  08/30/19   09/03/19    J&E ELECTRIC                        
                                                            EC-006A        -5,103                  08/30/19   09/03/19    J&E ELECTRIC                        
                                                            EC-007D        -8,994                  08/30/19   09/03/19    J&E ELECTRIC                        
                                                            EC-009A        -2,614                  08/30/19   09/03/19    J&E ELECTRIC                        
                                                            EC-010D        -1,241                  08/30/19   09/03/19    J&E ELECTRIC                        
                                                            GC-001 A       -6,866                  12/14/20   03/05/21    BETTE & CRING                       
                                                            GC-003A        -6,484                  07/25/19   08/13/19    BETTE & CRING                       
                                                            GC-007 A         -505                  08/19/19   10/04/19    BETTE & CRING                       
                                                            GC-008 A       -4,971                  08/19/19   08/21/19    BETTE & CRING                       
                                                            GC-010 A       -5,520                  09/11/19   09/24/19    BETTE & CRING                       
                                                            GC-011A        -1,808                  08/30/19   09/13/19    BETTE & CRING                       
                                                            GC-013 A       -8,293                  10/11/19   10/21/19    BETTE & CRING                       
                                                            GC-014 A       -1,965                  10/11/19   10/21/19    BETTE & CRING                       
                                                            GC-017 A       -1,018                  12/20/19   01/28/20    BETTE & CRING                       
                                                            HC-001 A         -400                  12/14/20   02/22/21    DW & CREW                           
                                                            HC-002A        -1,928                  08/30/19   09/03/19    DW & CREW                           
                                                            HC-003 A       -3,940                  09/25/19   09/30/19    DW & CREW                           
                                                            HC-004 A         -580                  10/11/19   10/18/19    DW & CREW                           
                                                            HC-006 A         -259                  12/20/19   01/10/20    DW & CREW                           
                                                            PC-004A          -572                  07/25/19   07/30/19    BURNS BROTHERS                      
                                                            PC-005 A         -472                  09/25/19   09/30/19    BURNS BROTHERS                      
                                                            PC-006 A       -8,725                  12/20/19   01/10/20    BURNS BROTHERS                      
                                                            PC-008 A         -771                  12/20/19   01/10/20    BURNS BROTHERS                      
                                                            PC-011 A       -3,930                  06/30/20   07/28/20    BURNS BROTHERS                      
 
17-1380   Reconstruction               0-007-036  01/24/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  09/03/19   09/27/19    BELLOWS CONSTRUCTION SPECIALITIES,LL
                                                            GC-02            -653                  09/25/19   09/27/19    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-03          -2,418                  11/12/19   01/17/20    BELLOWS CONSTRUCTION SPECIALTIES,LLC
 
18-2146   Reconstruction               0-007-037  08/28/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0157   Reconstruction               0-007-038  08/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  01/14/19   03/14/19    ROBERT H. LAW INC                   
                                                            GC-02            -595                  07/29/19   08/01/19    ROBERT H. LAW, INC.                 
 
18-1377   Reconstruction               0-007-039  03/14/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0059   Reconstruction               0-007-040  08/13/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  04/26/21   03/16/22    BACON & SEILER CONTRACTORS, INC.    
                                                            GC-02          -1,078                  12/09/21   12/20/22