ADIRONDACK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-04-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Boonville Central(Elementary):
90-1137   Reconstruction               0-002-003  04/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0981   Additions and Alterations    0-002-004  05/11/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            28             18,170                  05/04/01   02/11/02    Murnane Bldg.                       
                                                            85              1,804                  05/04/01   02/11/02    All-Phaze Elec.                     
                                                            86              4,237                  05/04/01   02/11/02    All-Phaze Elec.                     
 
03-1123   Reconstruction               0-002-005  04/30/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1516   Reconstruction               0-002-006  08/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             5,390                  06/21/10   08/11/10    ONEIDA ELECTRICAL CONTRACTORS       
                                                            E-5               409                  01/11/11   03/03/11    ONEIDA ELECTRICAL CONTRACTORS       
 
14-0767   Reconstruction               0-002-007  12/11/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-09           5,505                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            GC-04               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-14           6,745                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-19          14,646                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-31          14,179                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-33          -2,575                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            P-01            1,316                  03/12/18   05/31/18    H.J. Brandeles Corp.                
                                                            P-04            1,980                  03/12/18   05/31/18    H.J. Brandeles Corp.                
 
19-0894   Reconstruction               0-002-008  02/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-08               0                  02/16/21   04/06/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-11               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-24           7,746                  09/27/21   12/01/22    Putrelo Bldg Enterprises, Inc       
                                                            GC-29             999                  11/23/21   09/22/22    Putrelo Bldg Entrps Inc             
                                                            PC-04               0                  10/08/21   07/19/22    HJ Brandeles Corp                   
                                                            PC-05               0                  11/23/21   12/14/22    HJ Brandeles Corp                   
                                                            PC-07           2,588                  12/29/21   10/18/22    HJ Brandeles Corp                   
 
19-0983   Reconstruction               0-002-009  01/08/20  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1573SC Visual Structural Inspection 0-002-SC1  06/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Leyden Elementary School:
90-1138   Reconstruction               0-013-003  04/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0887   Additions and Alterations    0-013-004  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1124   Reconstruction               0-013-005  04/30/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-01         -16,585                  10/12/05   11/01/05    Puterlo Construction                
 
07-1517   Reconstruction               0-013-006  08/11/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0768   Reconstruction               0-013-007  12/11/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           7,064                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-03           5,109                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-07             321                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-11           3,320                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            GC-03               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-06               0                  04/12/18   04/23/18    Beebe Construction Services, Inc.   
                                                            GC-09               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-11               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-20               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-26            -585                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-28          15,000                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-30           3,851                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            MC-01           6,078                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            P-05            6,846                  03/12/18   05/31/18    H.J. Brandeles Corp.                
                                                            PC-09           6,513                  03/12/18   05/31/18    H.J. Brandeles Corp.                
 
19-0895   Reconstruction               0-013-008  02/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DDC-03        -15,777                  11/23/21   12/14/22    Day Auto Systems                    
                                                            GC-07         -12,500                  02/16/21   04/06/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            LC-02           5,400                  11/12/20   02/10/21    PARAGON ENVIROMENTAL CONSTRUCTION   
                                                            LC-06         -13,895                  01/12/22   01/30/23    Paragon Envirn Const Inc            
                                                            LC-07          -1,615                  01/12/22   01/30/23    Paragon Envirn Const Inc            
                                                            PC-02          23,450                  10/08/21   07/19/22    HJ Bradeles Corp                    
 
06-1572SC Visual Structural Inspection 0-013-SC1  06/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXForestport Elementary (sold 2019):
97-0888   Additions and Alterations    0-016-004  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1125   Reconstruction               0-016-005  04/30/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1518   Reconstruction               0-016-006  08/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SITE-2         12,417                  12/04/09   01/22/10    CENTRAL NY CONSTRUCTION             
 
14-0769   Reconstruction               0-016-007  12/11/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04           1,454                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            GC-12           6,629                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-18          17,136                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-34          -4,909                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            MC-06           3,670                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            P-03            3,899                  03/12/18   05/31/18    H.J. Brandeles Corp.                
                                                            P-06            6,973                  03/12/18   05/31/18    H.J. Brandeles Corp.                
 
06-1571SC Visual Structural Inspection 0-016-SC1  06/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
90-1139   Reconstruction               0-017-003  04/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0889   Additions and Alterations    0-017-004  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1162   Additions and Alterations    0-017-005  05/27/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-01          15,148                  11/09/05   02/15/06    Murphy Excavating                   
                                                            02-02           6,000                  11/09/05   01/17/06    Murphy Excavating Corp              
                                                            02-03          -2,055                  12/05/05   12/09/05    Murphy Excavating Corp              
                                                            03-02         -40,000                  12/05/05   12/09/05    Puterlo Construction                
                                                            03-03          -1,575                  08/14/06   09/05/06    Puterlo Construction                
                                                            04-01           2,728                  09/29/05   10/13/05    Pulver roofing                      
                                                            05-01          -4,670                  09/29/05   10/18/05    Buffalo hotel Supply                
                                                            05-02          -2,315                  11/15/05   11/23/05    Buffalo Hotel Supply                
                                                            05-03            -614                  12/05/05   12/09/05    Buffalo Hotel Supply                
                                                            06-01             614                  10/12/05   10/19/05    m and Plumbing heating              
                                                            07-01           8,601                  10/06/05   10/18/05    Schmalzz Mechanical Contractors     
                                                            07-02             448                  10/12/05   10/25/05    Schmalz Mechan ical Contractors     
                                                            07-03            -664                  05/31/06   11/22/06    Schmalz Mechanical                  
                                                            08-01          -5,536                  11/15/05   11/23/05    Huen New York                       
 
07-1519   Reconstruction               0-017-006  08/11/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2            62,329                  12/01/10   12/28/10    ONEIDA ELECTRICAL CONTRACTORS       
                                                            E-3               844                  01/11/11   03/21/11    ONEIDA ELECTRICAL CONTRACTORS       
                                                            E-4               952                  01/11/11   03/21/11    ONEIDA ELECTRICAL CONTRACTORS       
                                                            G-1            -5,969                  01/24/11   03/18/11    PUTRELO BUILDING ENTERPRISES        
                                                            M-1            20,565                  12/18/09   01/12/10    SCHARF PLUMBING AND HEATING         
                                                            M-2             4,507                  05/24/10   07/30/10    SCHARF PLUMBING & HEATING           
                                                            M-3            25,430                  12/01/10   12/28/10    SCHARF PLUMBING & HEATING           
                                                            P-1            -5,094                  03/09/10   05/25/10    MASON MECHANICAL                    
                                                            SITE-1         12,016                  12/04/09   01/22/10    CENTRAL NY CONSTRUCTION             
                                                            SITE-3          1,953                  12/04/09   01/22/10    CENTRAL NY CONSTRUCTION             
 
14-0770   Reconstruction               0-017-007  12/11/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           7,692                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-06               0                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-08           1,827                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-12        -148,727                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-13           6,699                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-14           7,636                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-16           9,433                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            GC-01               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-07               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-08               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-10               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-13               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-15               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-17               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-21               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-23               0                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-24          10,303                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-27           3,517                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-29           8,777                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-32          13,668                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            MC-02               0                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            MC-03               0                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            MC-04          18,037                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            MC-05           2,879                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            MC-07           6,092                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            MC-08          -9,004                  02/23/18   05/17/18    H.J. Brandeles Corp.                
                                                            P-02                0                  03/12/18   05/31/18    H.J. Brandeles Corp.                
                                                            P-07           10,290                  03/12/18   05/31/18    H.J. Brandeles Corp.                
                                                            PC-08           8,489                  03/12/18   05/31/18    H.J. Brandeles Corp.                
                                                            PC-10           5,335                  03/12/18   05/31/18    H.J. Brandeles Corp.                
 
17-0079   Reconstruction               0-017-008  12/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC01                0                  06/14/18   08/06/18    WHITTON CONSTRUCTION                
                                                            GC02             -228                  06/14/18   08/06/18    WHITTON CONSTRUCTION                
 
18-0168   Reconstruction               0-017-009  09/07/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  01/22/19   02/11/19    WHITTON CONSTRUCTION                
                                                            GC-02           1,552                  05/17/19   07/02/19    WHITTON CONSTRUCTION                
 
18-0610   Reconstruction               0-017-010  01/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  09/03/19   09/04/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-03           6,844                  11/19/19   11/26/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-05               0                  03/02/20   06/29/20    S.C. SPENCER ELECTRIC, INC.         
                                                            GC-01               0                  09/03/19   09/20/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-02               0                  09/03/19   09/20/19    BEEBE CONSTRUCTION SERVICES,INC.    
                                                            GC-03               0                  09/24/19   10/04/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-04               0                  09/24/19   10/04/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-05               0                  12/18/19   01/02/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-06               0                  01/06/20   01/30/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-07               0                  11/19/19   12/18/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-09          -6,404                  09/28/20   11/27/20    NEENE CONSTRUCTION SERVICES, INC.   
                                                            GC-11               0                  03/02/20   06/30/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-11         -40,869                  09/24/20   11/25/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            LC-01               0                  09/24/19   10/04/19    ADHAN PIPING CO.,INC.               
                                                            LC-03               0                  11/19/19   12/19/19    ADHAN PIPING CO.,INC.               
                                                            LC-06               0                  11/19/19   12/19/19    ADHAN PIPING CO.,INC.               
                                                            LC-07               0                  11/19/19   12/19/19    ADHAN PIPING CO.,INC.               
                                                            LC-08               0                  11/19/19   12/19/19    ADHAN PIPING CO.,INC.               
                                                            LC-09               0                  11/19/19   12/19/19    ADHAN PIPING CO.,INC.               
                                                            LC-10          16,500          16,500  11/20/19   12/04/19    ADHAN PIPING CO.,INC.               
                                                            LC-11               0                  01/31/20   02/26/20    ADHAN PIPING CO.,INC.               
                                                            RC-01               0                  11/19/19   12/18/19    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            RC-02               0                  11/19/19   12/18/19    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            RC-03               0                  11/19/19   12/18/19    EC ROOFING & CONSTRUCTION SUPPLY    
                                                            RC-04            -650                  01/06/20   01/30/20    EV ROOFING & CONSTRUCTION SUPPLY COR
                                                            RC-05               0                  03/02/20   06/30/20    EV ROOFING & CONSTRUCTION SUPPLY COR
 
19-0896   Reconstruction               0-017-011  02/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            DDC-01         24,047                  02/08/21   03/31/21    DAY AUTOMATION SYSTEMS              
                                                            DDC-02          1,327                  11/23/21     /  /      Day Auto Systems                    
                                                            EC-01           7,651                  09/15/20   11/25/20    ONEIDA ELECTRICAL CONTRACTORS, INC. 
                                                            EC-02               0                  09/03/20   11/05/20    ONEIDA ELECTRICAL CONTRACTORS, INC. 
                                                            EC-03               0                  11/12/20   02/16/21    ONEIDA ELECCTRICAL CONTRACTORS, INC.
                                                            EC-04               0                  10/08/21   07/19/22    Oneida Electrical Contractors, Inc  
                                                            EC-05               0                  10/08/21   07/19/22    Oneida Electrical Contractors, Inc  
                                                            EC-06               0                  10/08/21   07/19/22    Oneida Electrical Contractors, Inc  
                                                            EC-07               0                  10/08/21   07/19/22    Oneida Electrical Contractors, Inc  
                                                            EC-08             657                  10/08/21   07/19/22    Oneida Electrical Contractors, Inc  
                                                            EC-09          10,200                  09/27/21   11/30/22    Oneida Electrical COntractors, Inc  
                                                            EC-10           4,091                  12/14/21   09/27/22    Oneida Elec Contr Inc               
                                                            EC-11          14,624                  12/30/21   10/18/22    Oneida Elec Contrs Inc              
                                                            GC-01          55,000                  09/15/20   11/06/20    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-02         445,000                  09/15/20   11/06/20    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-03               0                  09/15/20   11/06/20    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-04               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-05               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-06               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-09               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-10               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-12               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-13               0                  02/16/21   04/15/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-14               0                  02/26/21   04/20/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-15               0                  03/19/21   05/11/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-16               0                  03/29/21   05/06/21    PUTRELO BUILDING ENTERPRISES, INC.  
                                                            GC-17               0                  06/18/21   03/14/22    Putrelo Building Enterprises        
                                                            GC-18               0                  06/18/21   03/14/22    Putrelo Building Enterprises        
                                                            GC-19               0                  06/18/21   03/14/22    Putrelo Building Enterprises        
                                                            GC-20               0                  10/08/21   07/28/22    Putrelo Bldg Enterprises, Inc       
                                                            GC-21               0                  10/08/21   07/28/22    Putrelo Bldg Enterprises, Inc       
                                                            GC-22               0                  10/08/21   07/28/22    Putrelo Bldg Enterprises, Inc       
                                                            GC-23               0                  10/08/21   07/26/22    Putrelo Bldg Enterprises, Inc       
                                                            GC-25          14,555                  09/27/21   12/01/22    Putrelo Bldg Enterprises, Inc       
                                                            GC-26          15,893                  09/27/21   01/26/23    Putrelo Bldg Entrps Inc             
                                                            GC-27           8,124                  11/15/21   12/08/22    Putrelo Bldg Entrp, Inc             
                                                            GC-28          14,269                  11/23/21   09/22/22    Putrelo Bldg Entrps Inc             
                                                            GC-30          11,349                  11/23/21   09/22/22    Putrelo Bldg Entrps, Inc            
                                                            GC-31          24,485                  11/23/21   09/22/22    Putrelo Bldg Entrps, Inc            
                                                            HVAC-01        12,000                  09/15/20   11/25/20    H.J. BRANDELES CORP.                
                                                            HVAC-02             0                  11/18/20   02/11/21    H.J. BRANDELES CORP.                
                                                            HVAC-03             0                  11/18/20   02/11/21    H.J. BRANDELES CORP.                
                                                            HVAC-04             0                  01/06/21   03/12/21    H.J. BRANDELES CORP.                
                                                            HVAC-05             0                  10/08/21   07/19/22    HJ Brandeles Corp                   
                                                            HVAC-06             0                  10/08/21   07/19/22    HJ Brandeles Corp                   
                                                            HVAC-07             0                  11/15/21   12/09/22    HJ Brandeles Corp                   
                                                            HVAC-08             0                  11/23/21   12/14/22    HJ Brandles Corp                    
                                                            HVAC-09       -57,414                  12/30/21   10/18/22    HJ Brandeles Corp                   
                                                            LC-01         274,000                  09/15/20   11/06/20    PARAGON ENVIROMENTAL CONSTRUCTION   
                                                            LC-03               0                  01/12/22   01/30/23    Paragon Envirn Const Inc            
                                                            LC-04         -10,400                  01/12/22   01/30/23    Paragon Environ Const Inc           
                                                            LC-05          -7,000                  01/12/22   01/30/23    Paragon Envirn Const Inc            
                                                            PC-01               0                  09/15/20   11/25/20    H.J. BRANDELES CORP.                
                                                            PC-03               0                  10/08/21   07/19/22    HJ Brandeles Corp                   
                                                            PC-06               0                  11/23/21   12/14/22    HJ Brandeles Corp                   
 
19-0647   Reconstruction               0-017-012  01/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -12,600                  07/02/20   10/19/20    PUTRELO BUILDING ENTERPRISES, INC.  
 
20-0575   Reconstruction               0-017-013  12/04/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1903   Reconstruction               0-017-014  11/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -3,428                  04/06/23   12/28/23    ONEIDA ELECTRICAL                   
                                                            EC-02          -1,250                  07/10/23   12/28/23    ONEIDA ELECTRICAL                   
                                                            EC-03          -3,522                  07/10/23   12/28/23    ONEIDA ELECTRICAL                   
                                                            GC-01          -6,183                  03/20/23   12/19/23    J. PRIORE CONSTRUCTION              
                                                            HC-01          -7,380                  03/20/23   12/19/23    H.J. BRANDELES CORP                 
                                                            HC-02          -2,500                  07/10/23   12/28/23    H.J BRANDELES CORP                  
                                                            PC-02          -1,500                  07/10/23   12/28/23    H.J. BRANDELES CORP                 
 
22-0130   Reconstruction               0-017-016  10/25/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2289   Reconstruction               0-017-017  07/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2362FP Reconstruction               0-017-FP1  08/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          West Leyden Bus Garage(Now 4-022):
03-1126   Reconstruction               4-003-002  04/30/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          New West Leyden Bus Garage:
07-1520   New Construction             4-022-001  08/11/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
90-1140   Reconstruction               5-001-001  04/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1073   Additions and Alterations    5-001-002  06/29/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00081          -1,877                  05/04/01   01/30/02    All-Phaze Elec.                     
 
03-1163   Reconstruction               5-001-003  05/27/04  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1521   Reconstruction               5-001-004  08/11/08  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0771   Reconstruction               5-001-005  12/11/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-05           9,826                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-10           5,142                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            EC-15          12,806                  02/23/18   05/16/18    Patricia Electric, Inc.             
                                                            GC-02               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-05               0                  03/22/18   03/23/18    Beebe Construction Services, Inc.   
                                                            GC-16           2,091                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-22             817                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
                                                            GC-25           6,336                  03/22/18   03/30/18    Beebe Construction Services, Inc.   
 
18-0611   Reconstruction               5-001-006  01/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04           5,864                  01/31/20   02/27/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-06           1,297                  09/24/20   11/09/20    S.C. SPENCER ELECTRIC, INC.         
                                                            GC-08               0                  09/28/20   11/27/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-10               0                  09/28/20   11/27/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            LC-02               0                  07/13/20   08/25/20    ADHAN PIPING CO.,INC.               
                                                            LC-04               0                  11/19/19   11/27/19    ADHAN PIPING CO.,INC.               
                                                            LC-05               0                  11/19/19   11/27/19    ADHAN PIPING CO.,INC.               
 
21-0055   Reconstruction               5-001-007  08/06/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3-001             720                  08/20/22   12/12/23    LaValley Bros Const                 
                                                            3-002          29,440                  08/20/22   12/12/23    LaValley Bros Const                 
                                                            3-003          11,770                  08/20/22   12/12/23    LaValley Bros Const                 
 
21-0428   Reconstruction               5-001-008  11/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            LC3-006        32,161                  12/05/22   12/22/23    LaValley Bros Const                 
                                                            LC3-007        -4,320                  12/05/22   12/22/23    LaValley Bros Const                 
                                                            LC3-08        -47,684                  12/05/22   12/22/23    LaValley Bros Const                 
 

          Press Box 2:
18-0612   Reconstruction               7-022-001  01/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02               0                  12/09/19   12/20/19    S.C. SPENCER ELECTRIC, INC.         
 

CAMDEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-06-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Middle School:
90-1129   Reconstruction               0-001-004  04/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1215   Reconstruction               0-001-007  04/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0884   Reconstruction               0-001-008  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0364   Reconstruction               0-001-009  11/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1461   Reconstruction               0-001-010  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1257   Reconstruction               0-001-011  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0560   Additions and Alterations    0-001-012  05/12/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-TC21        -5,488                  11/30/05   12/13/05    Siements Building Tech              
                                                            01/GC21         7,866                  10/07/02   10/25/02    Laurence Const.                     
                                                            01/H21         -4,825                  10/23/03   11/05/03    Airtech Heating                     
                                                            02/E21          2,775                  12/09/02     /  /      West Electric                       
                                                            02TC-21        -5,000                  11/30/05   12/13/05    Siemens Building Tech               
                                                            03/GC21         9,373                  10/07/02   10/25/02    Laurence Const.                     
                                                            04/GC21         8,830                  10/07/02   10/25/02    Laurence Const.                     
                                                            08/GC21         4,453                  08/19/02   09/05/02    Laurence Const.                     
                                                            10/GC21        -9,972                  10/14/04   11/19/04    Laurence Const.                     
                                                            11/GC21        -3,400                  10/14/04   10/25/04    Laurence Const.                     
                                                            12/GC21        -3,690           5,310  10/14/04   10/25/04    Laurence Const.                     
                                                            13/GC21        -5,000                  10/14/04   10/25/04    Laurence Const.                     
                                                            14/GC21        -1,169                  10/14/04   10/25/04    Laurence Const.                     
                                                            P21-016B      -12,082                  02/19/03   11/06/03    HJ Brandeles                        
 
98-1224   Reconstruction               0-001-014  06/17/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          -17,693                  06/01/00   12/02/03    Cortland Glass                      
 
00-1342   Reconstruction               0-001-015  10/13/01  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1492   Reconstruction               0-001-016  06/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01HVAC5        -1,500                  03/25/02   04/26/02    Schmalz Mech.                       
                                                            04ACM507          992                  07/24/02   07/24/02    Summit Environ.                     
                                                            05ACM508        3,368                  07/24/02   07/24/02    Summit Environ.                     
 
04-0758   Reconstruction               0-001-019  03/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-007             634                  03/10/06   06/30/06    Huen new York                       
 
04-1051SR Additions and Alterations    0-001-020  04/01/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            GC11-013            0                  06/19/08     /  /      George A Nole                       
 
05-0466   Additions and Alterations    0-001-020  02/09/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0006           -5,883                  05/01/07   05/15/07    George Nole and Sons                
                                                            001            -7,000                  10/30/06   12/18/06    Syracuse Scenery and Stage Lighting 
                                                            001            15,416                  02/22/07   03/14/07    Airtech heating                     
                                                            001            28,003                  07/27/09   08/18/09    NATIONAL BUILDING & RESTORATION CORP
                                                            002           -18,000                  10/30/06   12/18/06    George nole                         
                                                            002                 0                  10/31/07   01/28/08    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            002                 0                  09/25/09   10/09/09    NATIONAL BUILDING & RESTORATION CORP
                                                            003            13,035                  03/30/07   04/03/07    Patricia electric                   
                                                            003                 0                  10/31/07   01/28/08    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            003                 0                  11/18/09   12/28/09    NATIONAL BUILDING & RESTORATION CORP
                                                            004           -65,000                  10/30/06   12/18/06    George Nole                         
                                                            004             9,835                  08/02/07   10/29/07    Patricia Electric                   
                                                            004            -3,949                  12/03/08   05/20/09    AIRTECH HEATING & A/C SYSTEMS, INC. 
                                                            004                 0                  11/18/09   12/28/09    NATIONAL BUILDING & RESTORATION CORP
                                                            005           -13,169                  05/01/07   05/15/07    George Nole and Son                 
                                                            005                 0                  10/31/07   01/28/08    PATRICIA ELECTRIC INC               
                                                            005                 0                  11/18/09   12/28/09    NATIONAL BUILDING & RESTORATION CORP
                                                            006                 0                  10/31/07   01/28/08    PATRIC IA ELETRIC INC               
                                                            006            36,150                  11/23/09   12/29/09    NATIONAL BUILDING & RESTORATION CORP
                                                            007             3,093                  04/18/04   08/06/08    PATRICIA ELECTRIC, INC.             
                                                            007            18,975                  12/17/09   12/29/09    national building & restoration     
                                                            014             2,733                  06/02/08   08/28/08    George A Nole & Sons,Inc            
                                                            017             7,312                  04/18/08   04/24/08    GEORGE A NOLE & SON, INC.           
                                                            018            -1,501                  06/02/08   08/28/08    George A Nole & Sons,Inc            
                                                            019                 0                  07/31/08     /  /      GEORGE A. NOLE & SON, INC.          
                                                            020                 0                  07/31/08     /  /      GEORGE A. NOLE SON                  
                                                            2-009           9,880                  10/31/07     /  /      STEVE GENERAL CONTRACTORS INC       
                                                            2-010           4,432                  10/31/07     /  /      STEVE GENERAL CONTRACTORS           
                                                            4-15            4,408                  10/31/07     /  /      BILLITIER ELETRIC INC               
                                                            4-18              735                  10/31/07     /  /      BILLITIER ELETRIC INC               
                                                            E-11          -30,700                  09/07/06   12/27/06    Patricia electric                   
                                                            E-11           30,800                  10/04/06   10/24/06    patricia Electric                   
                                                            G-003               0                  02/28/06   05/25/06    Ritter Paratore Contracting         
                                                            G-004               0                  06/30/06   07/31/06    Ritter Paratore                     
                                                            G-005         -19,355                  06/30/06   07/31/06    Ritter paratore                     
                                                            GC-11         -51,140                  09/07/06   10/27/06    george Nole and Son                 
                                                            GC-11               0                  07/31/08   10/21/08    GEORGE A. NOLE & SON, INC.          
                                                            GC-11         -12,872                  07/31/08   10/31/08    GEORGE A. NOLE & SON, INC.          
                                                            GC-11               0                  09/19/08     /  /      GEORGE A. NOLE & SON, INC.          
                                                            GC11-009            0                  06/19/08   02/11/09    GEORGE A. NOLE                      
                                                            GC11-010            0                  06/19/08     /  /      GEORGE A. NOLE                      
                                                            GC11-011            0                  06/19/08     /  /      GEORGE A. NOLE                      
                                                            GC11-012            0                  06/19/08     /  /      GEORGE A. NOLE                      
                                                            GC11-013            0                  06/19/08     /  /      GEORGE A. NOLE                      
                                                            GC11-015        8,640                  02/05/08   03/19/08    George A. Nole & Son Inc            
                                                            GC11-016       11,277                  02/05/08   03/19/08    Geroge A. Nole & Son Inc.           
                                                            P-004               0                  06/30/06   10/27/06    Orchard Earth and Pipe              
                                                            P-005          -4,406                  06/30/06   11/15/06    Orchard Earth Pipe                  
                                                            P-006         -23,500                  06/30/06   10/27/06    Orchard earth Pipe                  
                                                            P-11           30,200                  09/07/06   10/27/06    Bellucci Enterprises                
                                                            P-11          -11,043                  02/21/08   03/28/08    BOVIS LEND LEASE LMB, INC           
                                                            P-11                0                  11/26/07     /  /      BELLUCCI ENTERPRISES                
                                                            SE11-002            0                  06/02/08     /  /      BOVIS LAND LEASE                    
 
08-1592   Reconstruction               0-001-021  10/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001                 0                  09/07/10   09/28/10    NATIONAL BUILDING & RESTORATION CORP
                                                            001                 0                  09/07/10   09/28/10    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            001                 0                  09/07/10   09/28/10    KNAPP ELECTRIC                      
                                                            002                 0                  09/07/10   10/29/10    NATIONAL BUILDING & RESTORATION CORP
                                                            002                 0                  02/28/11   03/23/11    KNAPP ELECTRIC                      
                                                            003             1,059                  02/28/11   03/23/11    NATIONAL BUILDING & RESTORATION CORP
                                                            003                 0                  02/28/11   03/23/11    KNAPP ELECTRIC                      
                                                            004               440                  02/28/11   03/23/11    NATIONAL BUILDING & RESTORATION CORP
                                                            004                 0                  10/27/11   02/23/12    KNAPP ELECTRIC                      
                                                            005               342                  02/28/11   03/23/11    NATIONAL BUILDING & RESTORATION CORP
                                                            005           -21,564                  10/27/11   02/23/12    KNAPP ELECTRIC                      
                                                            006                 0                  03/28/11   04/22/11    NATIONAL BUILDING & RESTORATION CORP
                                                            007                 0                  03/28/11   04/22/11    NATIONAL BUILDING & RESTORATION CORP
                                                            009                 0                  03/28/11   04/22/11    NATIONAL BUILDING & RESTORATION CORP
                                                            010             2,925                  03/28/11   04/22/11    NATIONAL BUILDING & RESTORATION CORP
                                                            011               350                  03/28/11   04/22/11    NATIONAL BUILDING & RESTORATION CORP
                                                            012               -57                  03/28/11   04/22/11    NATIONAL BUILDING & RESTORATION CORP
 
10-0676   Reconstruction               0-001-022  05/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            13,374                  07/09/12   11/16/12    MURNANE BUILDING CONTRACTORS INC    
                                                            001                 0                  07/09/12   07/16/13    KNAPP ELECTRIC                      
                                                            002                 0                  07/09/12   07/16/13    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            002                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            003                 0                  07/09/12   07/16/13    KNAPP ELECTRIC                      
                                                            003                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            004             5,333                  07/09/12   07/16/13    KNAPP ELECTRIC                      
                                                            004                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS        
                                                            005                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            005            16,621                  03/06/13   08/12/13    AIRTECH HEATING & A/C SYSTEMS INC   
                                                            006                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            006             2,979                  10/04/13   10/18/13    Airtech Heating & A/C Systems, Inc. 
                                                            007                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            008                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            008             2,930                  03/06/13   07/16/13    SCHARF PLUMBING & HEATING INC       
                                                            008/           -1,384                  10/04/13     /  /      Airtech Heating & A/C Systems, Inc. 
                                                            009                 0                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            009             5,431                  03/06/13   09/19/13    KNAPP ELECTRIC                      
                                                            009               590                  10/04/13   10/18/13    Airtech Heating & A/C Systems, Inc. 
                                                            010            18,307                  09/10/12   01/07/13    MURNANE BUILDING CONTRACTORS INC    
                                                            010            11,849                  10/04/13   10/25/13    Scharf Plumbing & Heating, Inc.     
                                                            010            21,456                  10/04/13   02/10/14    Airtech Heating & A/C Systems, Inc. 
                                                            011            13,525                  03/06/13   09/19/13    KNAPP ELECTRIC                      
                                                            011             7,282                  10/04/13   02/10/14    Airtech Heating & A/C Systems, Inc. 
                                                            012            13,666                  03/06/13   09/19/13    KNAPP ELECTRIC                      
                                                            012            10,825                  10/04/13   02/10/14    Airtech Heating & A/C Systems, Inc. 
                                                            013             4,568                  03/06/13   09/19/13    KNAPP ELECTRIC                      
                                                            013               705                  10/04/13   10/18/13    Airtech Heating & A/C Systems, Inc. 
                                                            014            11,127                  03/06/13   09/19/13    KNAPP ELECTRIC                      
                                                            016                 0                  10/04/13   10/18/13    Knapp Electric                      
                                                            018            15,106                  10/04/13   02/10/14    Knapp Electric                      
                                                            019              -637                  10/04/13   10/18/13    Knapp Electric                      
                                                            025            22,537                  03/06/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            026            21,689                  03/06/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            027            15,666                  03/06/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            029             6,150                  03/06/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            031             9,597                  03/06/13   08/27/13    MURNANE BUILDING CONTRACTORS INC    
                                                            032             5,247                  03/06/13   08/27/13    MURNANE BUILDING CONTRACTORS INC    
                                                            033            12,321                  03/06/13   08/26/13    MURNANE BUILDING CONTRACTORS INC    
                                                            034            10,502                  03/06/13   08/26/13    MURNANE BUILDING CONTRACTORS INC    
                                                            035             8,374                  03/06/13   08/26/13    MURNANE BUILDING CONTRACTORS INC    
                                                            036            13,379                  03/06/13   07/12/13    MURNANE BUILDING CONTRACTORS ICN    
                                                            037             2,398                  03/06/13   06/20/13    MURNANE BUILDING CONTRACTORS INC    
                                                            038            20,628                  03/06/13   06/20/13    MURNANE BUILDING CONTRACTORS INC    
                                                            040            19,239                  03/06/13   06/20/13    MURNANE BUILDING CONTRACTORS INC    
                                                            041            18,229                  03/06/13   06/20/13    MURNANE BUILDING CONTRACTORS INC    
                                                            042            23,699                  03/06/13   06/20/13    MURNANE BUILDING CONTRACTORS INC    
                                                            043            27,371                  03/06/13   06/20/13    MURNANE BUILDING CONTRACTORS INC    
                                                            048                 0                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            050             7,334                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            051            10,458                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            052            15,603                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            054             4,412                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            055            12,700                  04/25/13     /  /      MURNANE BUILDING CONTRACTORS INC    
                                                            056            10,972                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            057             5,967                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            058            13,798                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            059            11,029                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            060            11,055                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            061             5,854                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            063            15,570                  04/25/13   07/15/13    MURANEN BUILDING CONTRACTORS INC    
                                                            E-041          17,769                  10/04/13   02/10/14    Knapp Electric                      
                                                            E041-007            0                  12/03/12   06/28/13    Knapp Electric                      
                                                            E041-011       13,525                  12/02/12   06/28/13    Knapp Electric                      
                                                            GC - 041            0                  12/03/12   02/28/13    Murnane Building Contractors, Inc.  
                                                            GC - 041            0                  12/03/12   02/28/13    Murnane Building Contractors, Inc.  
                                                            GC - 041            0                  12/03/12   02/28/13    Murnane Building Contractors, Inc.  
                                                            GC - 041            0                  12/03/12   02/28/13    Murnane Building Contracotrs, Inc.  
                                                            GC-045         19,845                  10/04/13   10/21/13    Murnante Building Contractors, Inc. 
                                                            GC-047         28,245                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            GC-065          5,371                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            GC-067         21,387                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            GC-068        -16,818                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            GC-070          1,578                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            H - 041        19,982                  12/03/12   06/28/13    Airtech Heating & A/C Systems, Inc. 
                                                            H-007          13,645                  10/04/13   10/21/13    Airtech Heating & A/C Systems, Inc. 
                                                            H-008         -13,480                  10/04/13   10/21/13    AIRTECH HEATING & AC                
                                                            H041-004       16,369                  12/03/12   06/28/13    Airtech Heating & A/C Systems, Inc. 
                                                            P - 041        11,601                  12/03/12   02/28/13    Scharf Plumbing & Heating, Inc.     
                                                            P - 041        18,124                  12/03/12   02/28/13    Lend Lease (US) Construction        
                                                            P - 041         6,386                  12/03/12     /  /      Lend Lease (US) Construction Inc.   
                                                            P041-007         -166                  12/03/12   06/28/13    Scharf Plumbing & Heating, Icn.     
 
12-0463   Reconstruction               0-001-023  07/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  04/20/15   06/17/15    Airtech Heating and Air Conditioning
                                                            002                 0                  04/20/15   06/17/15    Airtech Heating And Air Condtioning 
                                                            003             6,808                  04/20/15   06/17/15    Scharf Plumbing & Heating, Inc.     
                                                            009            14,932                  04/20/15   06/17/15    Air Heating And Air Condtioning     
                                                            022             5,748                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            024            16,311                  06/24/15   10/29/15    Patricia Electric, Inc.             
                                                            038            13,225                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            050           119,930                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            054            23,870                  06/24/15   08/04/15    Murnane Building Contractors        
                                                            057            20,189                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            062            14,099                  06/26/15   07/17/15    Murnane Building Contractors        
                                                            063            25,611                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            066            11,982                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            070            27,288                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            5                   0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            7                   0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            GC-001              0                  11/25/13   12/17/13    ORCHARD EARTH AND PIPE              
                                                            GC-002              0                  11/25/13   12/17/13    ORCHARD EARTH AND PIPE              
 
15-0257   Reconstruction               0-001-024  11/18/15  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0087   Reconstruction               0-001-025  12/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0457   Reconstruction               0-001-026  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1060   Reconstruction               0-001-027  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1108FA Reconstruction               0-001-028  04/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1197FP Reconstruction               0-001-FP1  02/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Camden Elementary:
93-0885   Additions and Alterations    0-003-005  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0363   Reconstruction               0-003-006  11/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1022   Reconstruction               0-003-007  04/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1466   Reconstruction               0-003-008  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1555   Reconstruction               0-003-009  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06/GC21         3,969                  08/19/02   09/05/02    Laurence Const.                     
 
00-1344   Reconstruction               0-003-011  10/13/01  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1493   Reconstruction               0-003-012  06/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03/ACM5           400                  07/01/02   07/15/02    Summit Environ.                     
                                                            05/ACM5         3,368                  07/01/02   07/15/02    Summit Environ.                     
                                                            06/ACM5        -3,700                  07/01/02   07/15/02    Summit Environ.                     
 
04-0759   Reconstruction               0-003-014  03/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-004               0                  02/28/06   06/30/06    Huen new York                       
 
06-0659   Reconstruction               0-003-015  05/04/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            37,421                  07/30/08   01/22/09    R. E. ALEXANDER CO., INC.           
                                                            003             4,990                  02/23/09     /  /      CNY MECHANICAL ASSOCIATES, INC.     
                                                            003             4,990                  02/23/09   04/23/09    CNY MECHANICAL ASSOCIATES, INC.     
                                                            003           -13,648                  05/11/09   07/28/09    GREEN PLUMBING                      
                                                            005             1,735                  04/06/09     /  /      CNY MECHANICAL ASSOCIATES, INC.     
                                                            005           -19,436                  09/02/09   09/21/09    KNAPP ELECTRIC                      
                                                            006             3,578                  05/11/09   07/28/09    CNY MECHANCIAL ASSOCIATES, INC.     
                                                            007            -5,776                  09/02/09   09/21/09    RE ALEXANDER CO INC                 
                                                            008                 0                  10/23/09   12/08/09    R.E. ALEXANDER CO INC               
                                                            E-21          -17,790                  01/06/08   02/23/08    Knapp Electric                      
                                                            E-21                0                  11/26/08   01/22/09    KNAPP ELECTRIC                      
                                                            GC-005              0                  12/30/08   01/12/08    R.E. ALEXANDER                      
                                                            GC-006              0                  09/02/09   09/21/09    RE ALEXANDER CO INC                 
                                                            GC-21               0                  11/26/08   01/12/09    R. E. ALEXANDER CO., INC.           
                                                            H-21                0                  11/26/08   04/23/09    CNY MECHANCIAL ASSOCIATES, INC.     
                                                            H-21            2,099                  03/23/09   06/17/09    CNY MECHANCIAL ASSOCIATES, INC.     
                                                            P-21          -10,000                  11/26/08   01/22/09    GREEN PLUMBING                      
                                                            P-21                0                  11/26/08   01/22/09    GREEN PLUMBING                      
 
07-1743   Reconstruction               0-003-016  11/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002                 0                  11/18/09   12/31/09    MYRIAD CONSTRUCTION INC             
                                                            004                 0                  12/17/09   01/12/10    MYRIAD CONSTRUCTION INC             
                                                            006                 0                  04/07/10   06/16/10    MYRIAD CONSTRUCTION INC             
                                                            012                 0                  07/23/10   08/23/10    MYRIAD CONSTRUCTION INC             
                                                            014                 0                  07/23/10   08/23/10    RICHARD E ALEXANDER CO INC          
                                                            018                 0                  09/13/10   09/28/10    MYRIAD CONSTRUCTION INC             
 
10-0677   Reconstruction               0-003-017  05/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001            13,514                  12/03/12   02/22/13    Scharf Plumbing & Heating, Inc.     
                                                            002                 0                  07/09/12   07/16/13    KNAPP ELECTRIC                      
                                                            005             2,483                  07/09/12   07/16/13    KNAPP ELECTRIC                      
                                                            008             2,515                  03/06/13   07/15/13    KNAPP ELECTRIC                      
                                                            011             6,540                  10/04/13   01/31/14    Scharf Pluming & Heating, Inc.      
                                                            015             2,816                  03/06/13   07/15/13    KNAPP ELECTRIC                      
                                                            016                 0                  12/03/12   02/22/13    Murnane Building Contractors, Inc.  
                                                            017             6,363                  10/04/13   01/31/14    Knapp Electric                      
                                                            019            34,629                  12/03/12   02/22/13    Murnane Building Contractors, Inc.  
                                                            020            17,436                  03/06/13   08/27/13    MURNANE BUILDING CONTRACTORS INC    
                                                            021            36,750                  12/03/12   02/22/13    Murnane Building Contractors, Inc.  
                                                            022             5,513                  12/03/12   02/22/13    Murnane Building Contractors, Inc.  
                                                            028            16,257                  03/06/13   08/27/13    MURNANE BUILDING CONTRACTORS INC    
                                                            030             6,319                  03/06/13   08/27/13    MURNANE BUILDING CONTRACTORS INC    
                                                            039            19,346                  03/06/13   08/27/13    MURNANE BUILDING CONTRACTORS INC    
                                                            053             4,761                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            062             7,357                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            064             4,972                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            066             1,034                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            067             4,972                  04/25/13     /  /      MURNANE BUILDING CONTRACTORS INC    
                                                            E - 041         2,996                  12/03/12   02/28/13    Knapp Electric                      
                                                            E020            8,475                  10/04/13   10/21/13    Knapp Electric                      
                                                            GC - 014            0                  12/03/12     /  /      Murnane Building Contractors, Inc.  
                                                            GC - 041            0                  12/03/12   02/28/13    Murnane Building Contractors, Inc.  
                                                            GC - 041       25,166                  12/03/12   02/28/13    Murnane Building Contractors, Inc.  
                                                            GC-041         33,500                  12/03/12   02/28/13    MURNANE BLD CONTRACTORS             
                                                            GC-049         27,471                  04/25/13   07/15/13    MURNANE BUILDING CONTRACTORS INC    
                                                            GC-41           7,679                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            GC069           2,610                  10/04/13   10/21/13    Murnane Building Contractors, Inc.  
                                                            P - 041        14,309                  12/03/12   02/28/13    Scharf Plumbing & Heating, Inc.     
                                                            P - 041             0                  12/03/12   02/28/13    Scharf Plumbing & Heating, Inc.     
                                                            P-009          13,346                  10/04/13   10/21/13    Scharg Plumbing & Heating, Inc.     
 
12-0464   Reconstruction               0-003-018  07/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004             4,120                  04/20/15   06/17/15    Scharf Plumbing & Heating, Inc.     
                                                            005                 0                  04/20/15   06/17/15    Airtech Heating And Air Condtioning 
                                                            055            16,852                  06/24/15   08/17/15    Murnane Building Contractors Inc    
                                                            10                  0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            21             -4,765                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            30              5,178                  06/22/15   09/30/16    Murnane Building Contractors        
                                                            61              5,166                  06/26/15   07/17/15    Murnane Building Contractors        
 
21-0088   Reconstruction               0-003-019  12/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0072   Reconstruction               0-003-020  10/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0458   Reconstruction               0-003-021  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1185FP Reconstruction               0-003-FP1  02/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXAnnsville Area School(sold 1/2020):
96-1465   Reconstruction               0-004-006  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1553   Additions and Alterations    0-004-007  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01/E21          6,379                  08/19/02   09/05/02    West Elec.                          
                                                            02/GC21         4,937                  10/07/02   10/25/02    Laurence Const.                     
                                                            05/GC21         2,080                  08/19/02   09/05/02    Laurence Const.                     
                                                            07/GC21         3,277                  08/19/02   09/05/02    Laurence Const.                     
 
00-1341   Reconstruction               0-004-009  10/13/01  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1494   Reconstruction               0-004-010  06/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01/ACM5           261                  07/01/02   07/15/02    Summit Environ.                     
 
01-0772   Reconstruction               0-004-011  04/10/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0760   Reconstruction               0-004-012  03/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001               0                  11/28/05   12/09/05    Huen new York                       
                                                            G-001               0                  03/10/06   07/21/06    Richard Alexander                   
 
07-1744   Reconstruction               0-004-013  11/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002                 0                  11/18/09   12/31/09    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            003                 0                  04/01/10   06/14/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            004            -6,636                  07/19/10   09/03/10    DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            005                 0                  12/17/09   01/12/10    RICHARD E ALEXANDER CO INC          
                                                            007                 0                  03/08/10   05/20/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            008              -615                  03/08/10   06/04/10    RICHARD E ALEXANDER CO INC          
                                                            008              -704                  03/08/10     /  /      SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            009             6,478                  03/08/10   05/20/10    RICHARD E ALEXANDER CO INC          
                                                            009                 0                  04/01/10   06/14/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            009                 0                  04/01/10   06/14/10    MYRIAD CONSTRUCTION INC             
                                                            010             7,947                  03/08/10   05/20/10    RICHARD E ALEXANDER CO INC          
                                                            010                 0                  07/23/10   08/23/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            010                 0                  07/23/10   08/23/10    MYRIAD CONSTRUCTION INC             
                                                            011             6,188                  03/08/10   05/20/10    RICHARD E ALEXANDER CO INC          
                                                            011            12,648                  07/23/10   08/23/10    MYRIAD CONSTRUCTION INC             
                                                            012                 0                  09/13/10   09/28/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            013            -3,124                  10/07/10   10/29/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            015                 0                  07/23/10   08/23/10    MYRIAD CONSTRUCTION INC             
                                                            016                 0                  07/23/10   08/23/10    RICHARD E ALEXANDER CO INC          
                                                            017                 0                  09/13/10   09/28/10    MYRIAD CONSTRUCTION INC             
                                                            017                 0                  09/13/10   09/28/10    RICHARD E ALEXANDER CO INC          
                                                            020            -1,064                  10/25/10   11/16/10    MYRIAD CONSTRUCTION INC             
                                                            020            -8,001                  01/27/11   02/28/11    RICHARD E ALEXANDER CO INC          
 
10-0678   Reconstruction               0-004-014  05/23/11  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0465   Reconstruction               0-004-015  07/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            023             1,116                  06/24/15   10/29/15    Patricia Electric, Inc.             
                                                            37                726                  06/22/15   10/29/15    Murnane Building Constructors       
 
16-0665   Reconstruction               0-004-016  02/13/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0105   Reconstruction               0-004-017  08/18/17  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1200FP Reconstruction               0-004-FP1  02/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXNorth Bay ES(sold 05/2017):
96-1463   Reconstruction               0-005-005  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1554   Additions and Alterations    0-005-006  08/18/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-PE21        -9,000                  02/03/03   02/11/03    RE Woodson                          
                                                            09/GC21         4,959                  10/07/02   10/25/02    Laurence Const.                     
 
00-1343   Reconstruction               0-005-008  10/13/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01E61005      -16,545                  07/24/02   10/24/02    Huen New York                       
                                                            01G61003       12,500                  07/24/02   08/28/02    Richard Alexander                   
                                                            01H61002       -2,183                  07/24/02   08/28/02    CMP Sheet Metal                     
                                                            01P61001       13,300                  07/24/02   08/28/02    Superior Plumbing                   
                                                            01T61006       -2,207                  07/24/02   08/28/02    KAMA Communications                 
                                                            02G61007      -10,632                  07/24/02   08/28/02    Richard Alexander                   
                                                            02P61004         -837                  07/24/02   08/27/02    Superior Plumbing                   
 
99-1495   Reconstruction               0-005-009  06/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02ACM502          341                  07/24/02   07/24/02    Summit Environ.                     
 
01-0773   Reconstruction               0-005-010  04/10/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E2-004         -2,423                  11/04/03   11/20/03    Huen New York                       
 
04-0761   Reconstruction               0-005-011  03/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002               0                  11/28/05   12/09/05    Huen new York                       
                                                            E-006               0                  03/10/06     /  /      Huen new York                       
                                                            G-003               0                  03/10/06   07/21/06    Richard Alexander                   
                                                            G-004          -2,776                  06/30/06   08/11/06    Richard Alexandedr                  
 
07-1745   Reconstruction               0-005-012  11/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  10/23/09   12/08/09    RICHARD E ALEXANDER CO INC          
                                                            001                 0                  11/18/09   12/31/09    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            002                 0                  11/18/09   12/31/09    RICHARD E ALEXANDER CO INC          
                                                            002                 0                  04/01/10   06/14/10    DANIEL J D'AMICO PLUMBING/HEATING   
                                                            003                 0                  11/18/09   12/31/09    RICHARD E ALEXANDER CO INC          
                                                            004                 0                  12/17/09   01/12/10    RICHARD E ALEXANDER CO INC          
                                                            005                 0                  12/17/09   01/12/10    MYRIAD CONSTRUCTION INC             
                                                            006                 0                  12/17/09   01/12/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            006                 0                  12/17/09   01/12/10    RICHARD E ALEXANDER CO INC          
                                                            008                 0                  04/01/10   06/14/10    MYRIAD CONSTRUCTION INC             
                                                            011                 0                  07/23/10   09/13/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            013                 0                  07/23/10   09/13/10    MYRIAD CONSTRUCTION INC             
                                                            013                 0                  07/23/10   09/13/10    RICHARD E ALEXANDER CO INC          
                                                            016                 0                  09/13/10   09/28/10    MYRIAD CONSTRUCTION INC             
                                                            019                 0                  01/27/11   02/28/11    RICHARD E ALEXANDER CO INC          
 
10-0679   Reconstruction               0-005-013  05/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  11/25/13   01/31/14    NATIONAL BUILDING & RESTORATION COR 
                                                            GC-002              0                  11/25/13   01/31/14    NATIONAL BUILDING & RESTORATION COR 
                                                            GC-003           -677                  11/25/13   01/31/14    ORCHARD EARTH AND PIPE              
 
02-1198FP Reconstruction               0-005-FP1  02/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          McConnellsville Elementary:
96-1460   Reconstruction               0-007-002  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0033   Additions and Alterations    0-007-003  11/24/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0762   Reconstruction               0-007-006  03/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            G-002               0                  03/10/06   07/24/06    Ricahrd Alexander Co                
 
07-1746   Reconstruction               0-007-007  11/05/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  12/17/09   12/31/09    MYRIAD CONSTRUCTION INC             
                                                            001                 0                  04/01/10     /  /      DANIEL J D'AMICO PLUMBING/HEATING CO
                                                            003                 0                  11/18/09   12/31/09    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            005                 0                  11/18/09   12/31/09    SCHMALZ MECHANICAL CONTRACTORS      
                                                            007                 0                  12/17/09   01/12/10    RICHARD E ALEXANDER CO INC          
                                                            007                 0                  04/01/10   06/14/10    MYRIAD CONSTRUCTION INC             
                                                            014                 0                  07/23/10   08/23/10    MYRIAD CONSTRUCTION INC             
                                                            018                 0                  01/27/11   02/28/11    RICHARD E ALEXANDER CO INC          
                                                            019                 0                  09/13/10   09/28/10    MYRIAD CONSTRUCTION INC             
                                                            H-004          21,919                  11/18/09   02/02/10    SCHMALZ MECHANICAL CONTRACTORS INC  
 
10-0680   Reconstruction               0-007-008  05/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003              0                  11/25/13     /  /      NATIONAL BUILDING & RESTORATION COR 
                                                            GC-004        -52,004                  11/25/13   01/31/14    NATIONAL BUILDING & RESTORATION COR 
 
12-0466   Reconstruction               0-007-009  07/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            006             1,714                  04/20/15   06/17/15    Airtech Heating And Air Condtioning 
                                                            018            21,494                  06/24/15   10/29/15    Murnane Building Contractors        
                                                            056            19,659                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            065             3,072                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            11                  0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            18             21,494                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            26              1,363                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            28             28,087                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            31             12,308                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            32             12,450                  06/22/15   10/29/15    Murnane Builkding Constructors      
                                                            33              5,423                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            34             17,829                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            35             17,069                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            36             24,942                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            8                   0                  06/22/15   10/29/15    Murnane Building Contractors        
 
17-1977   Reconstruction               0-007-010  06/20/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0062   Reconstruction               0-007-011  08/16/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1061   Additions and Alterations    0-007-012  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0089   Reconstruction               0-007-013  12/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0459   Reconstruction               0-007-014  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1199FP Reconstruction               0-007-FP1  02/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Camden High School:
93-0886   Additions and Alterations    0-012-005  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0257   Reconstruction               0-012-006  11/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0365   Reconstruction               0-012-007  11/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1462   Reconstruction               0-012-008  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1550   Additions and Alterations    0-012-009  11/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003AF         -23,500                  03/23/04   04/13/04    Siemens Building Tech               
                                                            01/H11          1,078                  12/02/02   01/02/03    Bovis Lend Lease                    
                                                            01/LC11       -10,224                  10/07/02   11/06/02    Spencer Virnoche                    
                                                            03/H11          7,824                  03/10/03   03/20/03    Airtech Heating                     
                                                            03P11029       -8,718                  02/12/02   05/13/02    Superior Plumbing                   
                                                            04/ACM11      -11,664                  02/19/02   04/04/02    Avala Contracting                   
                                                            05/E11         56,155                  08/29/02   01/08/03    West Elec.                          
                                                            06/E11         21,888                  08/29/02   01/08/03    West Elec.                          
                                                            07/E11          5,185                  08/29/02   01/08/03    West Elec.                          
                                                            07/S11         -1,255                  05/16/02   05/24/02    Ritter & Paratore                   
                                                            09/GC11         6,473                  02/19/02   04/04/02    BF Yenny Const.                     
                                                            09E11          -4,152                  11/30/05   12/13/05    West Electric                       
                                                            10/GC11         7,518                  01/18/02   03/29/02    BF Yenny Const.                     
                                                            11/GC11        -3,616                  02/14/02   03/21/02    BF Yenny Const.                     
                                                            E11            -9,765                  11/08/05   06/30/06    West Electric                       
                                                            H11-037A       18,642                  02/06/03   02/24/03    Airtech Heating                     
 
98-1220   Reconstruction               0-012-010  06/17/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1496   Reconstruction               0-012-012  06/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01GC5009      -18,217                  03/25/02   04/26/02    BF Yenny Const.                     
                                                            06ACM510       -3,700                  07/24/02   07/24/02    Summit Environ.                     
 
01-0774   Reconstruction               0-012-013  04/10/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H2-001A       -14,017                  02/06/03   02/13/03    Airtech Heating                     
                                                            H2-003        -10,000                  07/24/03   08/27/03    Airtech Heating                     
 
04-0763   Reconstruction               0-012-015  03/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-003               0                  11/28/05   07/24/06    Huen New York                       
                                                            E-005          -3,000                  02/28/05   06/30/06    Huen new York                       
                                                            E-008             545                  06/30/06   11/28/06    Huen new York                       
                                                            H-001               0                  11/28/05   12/09/05    Airtech heating and A/c Systems     
                                                            H-002               0                  12/21/05   01/19/06    Airtech heating A/c Systems         
                                                            H-003         -10,761                  07/26/06   01/24/07    Airtech heating and AC Systems      
                                                            R-001         -23,140                  09/23/05   06/12/06    Cobblestone Construction            
                                                            R-002               0                  02/28/06   06/12/06    Cobblestone Construction Co         
                                                            R-003          -5,029                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-004               0                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-005               0                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-006               0                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-007               0                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-008               0                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-009               0                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-010               0                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-011           5,000                  02/28/06   06/12/06    Cobblestone Construction            
                                                            R-012         -13,061                  07/26/06   08/10/06    Cobblestone Construction'           
 
05-0467   Reconstruction               0-012-016  02/09/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002                 0                  11/26/07   01/28/08    BELLUCCI ENTERPIRSES                
                                                            002                 0                  11/26/07   01/28/08    BELLUCCI TNERPIRSES                 
                                                            007            11,673                  08/02/07   08/20/07    George Nole and Sons                
                                                            008                 0                  07/31/08   08/26/08    GEORGE A. NOLE & SON, INC.          
                                                            GC-11          21,000                  10/04/06   10/24/06    George Nole Sons                    
 
09-1149   Reconstruction               0-012-017  10/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001            17,500                  11/21/11   04/05/12    MURNANE BUILDING CONTRACTORS INC    
                                                            001             6,433                  12/12/11   07/16/12    WATSON ELECTRIC INC                 
                                                            001                 0                  05/23/12   12/13/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            001            20,128                  07/09/12   12/13/12    SCHARF PLUMBING & HEATING INC       
                                                            001            13,339                  12/03/12   02/22/13    PAUL F. VITALE, INC                 
                                                            001             1,082                  01/16/14   02/20/14    Jospeh Flihan Company               
                                                            002             9,818                  03/21/12   08/31/12    JOSEPH FLIHAN COMPANY               
                                                            002            27,530                  06/08/12   12/13/12    WATSON ELECTRIC INC                 
                                                            002           -28,005                  07/09/12   12/13/12    SECOA INC                           
                                                            002            14,326                  08/15/12   12/13/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            002                 0                  03/20/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            002            27,905                  01/16/14   02/20/14    Murnane Building Constructors, Inc. 
                                                            003             2,945                  04/27/12   09/07/12    JOSEPH FLIHAN COMPANY               
                                                            003                 0                  08/15/12   12/13/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            003            22,773                  08/15/12   12/13/12    WATSON ELECTRIC INC                 
                                                            003                 0                  03/20/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            003             8,298                  01/16/14   02/20/14    Murnane Building Contractors, Inc.  
                                                            004            22,875                  11/21/11   04/05/12    MURNANE BUILDING CONTRACTORS INC    
                                                            004            15,304                  07/09/12   12/13/12    WATSON ELECTRIC INC                 
                                                            004            19,426                  07/26/12   12/13/12    SCHMALZ MECHANICAL CONTRACTORS INC. 
                                                            004                 0                  03/20/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            005            19,721                  07/09/12   12/13/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            005                 0                  07/09/12   12/13/12    JOSEPH FLIHAN COMPANY               
                                                            005             2,320                  08/15/12   12/13/12    WATSON ELECTRIC INC                 
                                                            005             9,682                  01/28/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            005            12,579                  01/16/14   02/20/14    Murnane Building Contractors, Inc.  
                                                            006            15,501                  01/23/12   04/13/12    MURNANE BUILDING CONTRACTORS INC    
                                                            006              -110                  07/09/12   12/13/12    JOSEPH FLIHAN COMPANY               
                                                            006             9,924                  08/15/12   12/13/12    WATSON ELECTRIC INC                 
                                                            006             8,027                  01/07/13   07/01/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            006            17,063                  03/20/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            007             5,569                  01/23/12   04/13/12    MURNANE BUILDING CONTRACTORS INC    
                                                            007            14,850                  07/26/12   07/01/13    WATSON ELECTRIC INC                 
                                                            007               -38                  03/20/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            007                 0                  01/28/13   07/01/13    Schmalz Mechanical Contractors, Inc.
                                                            008             8,191                  05/23/12   10/23/12    MURNANE BUILDING CONTRACTORS INC    
                                                            008             9,862                  09/13/12   07/02/13    WATSON ELECTRIC INC                 
                                                            008             8,225                  01/28/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            008                 0                  04/25/13   07/16/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            009            20,377                  08/15/12   12/13/12    WATSON ELECTRIC INC                 
                                                            009            20,651                  01/28/13   07/01/13    SCHARF PLUMBING & HEATING INC       
                                                            009            17,624                  01/28/13   04/26/13    MURNANE BUILDING CONTRACTORS INC    
                                                            009                 0                  03/20/13   07/01/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            010            25,929                  07/26/12   07/02/13    WATSON ELECTRIC INC                 
                                                            010            10,996                  05/13/13   07/03/13    Murnane Building Contractors, Inc.  
                                                            010                 0                  04/25/13   07/16/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            010             7,544                  08/26/13   02/14/14    Scharf Plumbing & Heating, Inc.     
                                                            011            14,982                  08/15/12   12/13/12    WATSON ELECTRIC INC                 
                                                            011                 0                  04/10/13   07/02/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            011             7,257                  05/20/13   07/03/13    Murnane Building Contractors, Inc.  
                                                            011            -2,000                  08/28/13   02/14/14    Scharf Plumbing & Heating, Inc.     
                                                            012            16,014                  08/15/12   12/13/12    WATSON ELECTRIC INC                 
                                                            012            20,098                  05/28/13   07/26/13    Murnane Building Contractors, Inc.  
                                                            012                 0                  07/17/13   08/15/13    Schmalz Mechanical Contractors, Inc.
                                                            013            13,260                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            013            -1,238                  04/10/13   07/02/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            013            14,240                  06/03/13   07/26/13    Murnane Building Contractors, Inc.  
                                                            014            17,056                  05/23/12   10/23/12    MURNANE BUILDING CONTRACTORS INC    
                                                            014            23,219                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            014             5,135                  03/20/13   07/01/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            015             7,312                  06/08/12   11/13/12    MURNANE BUILDING CONTRACTORS INC    
                                                            015                 0                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            015             9,677                  04/25/13   07/16/13    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            016             6,195                  06/08/12   11/13/12    MURNANE BUILDING CONTRACTORS INC    
                                                            016                 0                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            017            23,229                  08/15/12   11/29/12    MURNANE BUILDING CONTRACTORS INC    
                                                            017                 0                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            018            28,113                  08/15/12   11/29/12    MURNANE BUILDING CONTRACTORS INC    
                                                            018                 0                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            019             8,204                  08/15/12   11/29/12    MURNANE BUILDING CONTRACTORS INC    
                                                            019                 0                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            020            16,156                  07/26/12   01/24/13    MURNANE BUILDING CONTRACTORS INC    
                                                            020                 0                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            021            13,502                  08/15/12   11/29/12    MURNANE BUILDING CONTRACTORS INC    
                                                            021            10,075                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            022            19,213                  09/13/12   01/24/13    MURNANE BUILDING CONTRACTORS INC    
                                                            022             3,990                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            023            17,250                  08/15/12   11/29/12    MURNANE BUILDING CONTRACTORS INC    
                                                            023             3,226                  08/26/13   02/14/14    Watson Electric, Inc.               
                                                            024            10,652                  08/26/13   02/14/14    Watson Electric Inc.                
                                                            025            11,263                  07/26/12   01/24/13    MURNANE BUILDING CONTRACTORS INC    
                                                            025            10,500                  09/27/13   02/14/14    Watson Electric Inc.                
                                                            026                 0                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            026             3,359                  06/19/13   07/16/13    Watson Electric, Inc.               
                                                            027               683                  12/03/12   02/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            027             9,507                  08/26/13   02/14/14    Watson Electric Inc.                
                                                            028            12,399                  12/03/12   02/22/13    MURNANE BUILDING CONTRACTORS, INC.  
                                                            028             8,088                  08/26/13   02/14/14    Watson Electic Inc.                 
                                                            029                 0                  12/03/12   02/22/13    MURNANE BUILDING CONTRACTOR INC     
                                                            029             9,421                  03/20/13   07/01/13    WATSON ELECTRIC INC                 
                                                            030                 0                  12/03/12   02/22/13    MURNANE BUILDING CONTRACTORS INC.   
                                                            030              -457                  08/28/13   02/14/14    Watson Electric Inc.                
                                                            031                 0                  03/20/13   06/18/13    MURNANE BUILDING CONTRACTORS INC    
                                                            031             1,553                  06/19/13   07/16/13    Watson Electric Inc.                
                                                            032                 0                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            032             3,296                  06/19/13   07/16/13    Watson Electric Inc.                
                                                            033                 0                  12/03/12   02/22/13    MURNANE BUILDING CONTRACTORS, INC.  
                                                            033            30,812                  06/19/13   07/16/13    Watson Electric Inc.                
                                                            034                 0                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            034            13,718                  08/26/13   02/14/14    Watson Electric Inc.                
                                                            035                 0                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            035            10,448                  09/27/13   02/14/14    Watson Electric Inc.                
                                                            036                 0                  03/20/13   06/18/13    MURNANE BUILDING CONTRACTORS INC    
                                                            037                 0                  04/10/13   06/28/13    MURNANE BUILDING CONTRACTORS INC    
                                                            038             1,250                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            039            14,239                  04/10/13   06/28/13    MURNANE BUILDING CONTRACTORS INC    
                                                            040             5,338                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            041             1,943                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            042             9,284                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            043             2,304                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            044             1,914                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            045                 0                  01/07/13   03/22/13    MURNANE BUILDING CONTRACTORS INC    
                                                            046             2,935                  03/24/13   06/18/13    MURNANE BUILDING CONTRACTORS INC    
                                                            047             8,409                  03/20/13   06/18/13    MURNANE BUILDING CONTRACTORS INC    
                                                            048            13,936                  03/20/13   06/18/13    MURNANE BUILDING CONTRACTORS INC    
                                                            049            21,014                  01/28/13   04/26/13    MURNANE BUILDING CONTRACTORS INC    
                                                            050                 0                  04/10/13   06/28/13    MURNANE BUILDING CONTRACTORS INC    
                                                            051                 0                  04/10/13   06/28/13    MURNANE BUILDING CONTRACTORS INC    
                                                            052                 0                  04/10/13   07/02/13    MURNANE BUILDING CONTRACTORS INC    
                                                            053                 0                  08/28/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            054                 0                  08/28/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            055             5,003                  08/28/13   02/14/14    Murnane building Contractors, Inc.  
                                                            056             4,527                  08/26/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            057             3,435                  04/10/13   06/28/13    MURNANE BUILDING CONTRACTORS INC    
                                                            058             2,780                  04/10/13   06/28/13    MURNANE BUILDING CONTRACTORS INC    
                                                            059            10,156                  04/10/13   06/28/13    MURNANE BUILDING CONTRACTORS INC    
                                                            060             8,709                  08/26/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            061             4,255                  02/14/14   02/14/14    Murnane Building Contractors, Inc.  
                                                            062            11,085                  08/26/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            063             6,718                  08/26/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            064             5,168                  08/28/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            065             9,046                  08/26/13   02/14/14    Murnane Building Contractors, Inc.  
                                                            GC-024         34,597                  07/09/12   11/27/12    MURNANE BUILDING CONTRACTORS INC    
                                                            H-031           7,785                  06/19/13   07/16/13    Schmalz Mechanical Constractors, Inc
                                                            KE-004              0                  07/09/12   11/27/12    JOSEPH FLIHAN COMPANY               
                                                            SE-001              0                  07/09/12   11/27/12    SECOA INC                           
 
10-1055   Reconstruction               0-012-018  06/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  04/18/12   08/31/12    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            001                 0                  09/13/12   01/24/13    UTICA GLASS COMPANY                 
                                                            002                 0                  04/18/12   08/31/12    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            002            -4,217                  09/13/12   01/24/13    UTICA GLASS COMPANY                 
                                                            003           -32,183                  04/18/12   08/31/12    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            004            -3,265                  04/27/12   10/23/12    BOLAND'S EXCAVATING & TOPSOIL INC   
 
12-0467   Reconstruction               0-012-019  07/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003                 0                  04/20/15   06/17/15    Airtech Heating And Air Condtioning 
                                                            004                 0                  04/20/15   06/17/14    Airtech Heating And Air Condtioning 
                                                            005             2,172                  04/20/15   06/17/15    Scharf Plumbing & Heating, Inc.     
                                                            006                 0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            007            15,826                  04/20/15   06/17/15    Airtech Heating And Air Condtioning 
                                                            008            16,931                  04/20/15   06/17/15    Airtech Heating And Air Condtioning 
                                                            019            10,855                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            021            21,225                  06/24/15   10/29/15    Patricia Electric, Inc              
                                                            022             9,181                  06/24/15   10/29/15    Patricia Electric, Inc.             
                                                            026            12,104                  06/24/15   10/29/15    Patricia Electric, Inc.             
                                                            027             8,198                  06/24/15   10/29/15    Patricia Electric, Inc.             
                                                            040            16,223                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            042            14,314                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            043            21,230                  06/24/15   08/17/15    Murnane Building Contractors Inc    
                                                            044            16,584                  06/24/15   08/17/15    Murnane Building Contractors Inc    
                                                            045            15,332                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            046            10,682                  06/24/15   08/17/15    Murnane Building Contractors Inc    
                                                            047            21,884                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            048            22,451                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            049            22,349                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            051            20,504                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            052            16,782                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            053            21,140                  06/24/15   08/17/15    Murnane Building Contractors        
                                                            058            10,136                  06/24/15   08/17/15    Murnane Building Contractors Inc    
                                                            059            19,956                  06/24/15   08/04/15    Murnane Building Contractors Inc    
                                                            071             7,684                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            1                   0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            12                  0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            13                  0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            14                  0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            15                  0                  06/22/15   10/29/15    Murnane Building Contractos         
                                                            17                  0                  06/22/15   10/29/15    Murnane Building Contractos         
                                                            2                   0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            20              8,213                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            24             15,775                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            25              5,793                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            27             18,740                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            29             14,759                  06/22/15   10/29/15    Murnane Building Constructors       
                                                            3                   0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            4                   0                  06/22/15   10/29/15    Murnane Building Contractors        
                                                            67             28,317                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            68             25,841                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            69             23,176                  06/26/15   07/21/15    Murnane Building Contractors        
                                                            9                   0                  06/22/15   10/29/15    Murnane Building Contractors        
 
21-0090   Reconstruction               0-012-020  12/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0460   Reconstruction               0-012-021  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1062   Reconstruction               0-012-022  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1109FA Reconstruction               0-012-023  04/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1196FP Reconstruction               0-012-FP1  02/25/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Admin (see 9-002):
96-1458   Reconstruction               1-002-001  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Bldg.:
96-1464   Reconstruction               3-009-001  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0216   Additions and Alterations    3-009-002  09/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Maintenance Facility:
91-0162   Reconstruction               5-008-002  08/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1459   Reconstruction               5-008-003  06/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0113   Additions and Alterations    5-008-006  11/07/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            34,638                  09/02/08   06/15/09    SCHARF PLUMBING & HEATING, INC.     
                                                            001              -855                  04/06/09   04/23/09    JAMES & SON CONSTRUCTION CO., INC.  
                                                            001            -4,290                  04/06/09   04/23/09    AIRTECH HEATING & A/C SYSTEMS, INC. 
                                                            002             6,361                  05/11/09   07/29/09    SCHARF PLUMBING & HEATING, INC.     
                                                            002            -9,000                  09/03/09   09/21/09    JAMES & SON CONSTRUCTION CO INC     
                                                            003            14,070                  12/03/08     /  /      HARVEY MATERIALS CORP.              
                                                            003                 0                  05/11/09   07/28/09    SCHARF PLUMBING & HEATING, INC.     
                                                            004           -35,675                  02/27/09   06/01/09    HARVEY MATERIALS CORP.              
                                                            004             1,503                  10/23/09   12/08/09    KNAPP ELECTRIC                      
                                                            005                 0                  05/11/09   07/28/09    HARVEY MATERIALS CORP.              
                                                            E-001          12,236                  09/19/08   06/15/09    KNAPP ELECTRIC                      
                                                            E-002           7,659                  09/19/08   04/30/09    KNAPP ELECTRIC                      
                                                            E-003          25,330                  09/19/08   06/15/09    KNAPP ELECTRIC                      
                                                            S-001          20,550                  09/19/08   10/24/08    HARVEY MATERIALS CORP.              
                                                            S-31           70,607                  10/20/08   01/16/09    HARVEY MATERIALS CORP.              
 
12-0468   Reconstruction               5-008-008  07/17/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  04/20/15   07/09/15    Scharf Plumbing & Heating, Inc.     
                                                            002                 0                  04/20/15   06/17/15    Scharft Plumbing & Heating, Inc.    
                                                            006             7,702                  04/20/15   06/17/15    Scharf Plumbing & Heating, Inc.     
                                                            025             6,152                  06/24/15   10/29/15    Patricia Electric, Inc.             
                                                            39             11,210                  07/20/15   08/05/15    Murnane Building Contractors        
                                                            60             14,317                  06/26/15   08/31/15    Murnane Building Contractors        
                                                            64             17,955                  06/26/15   09/01/15    Murnane Building Contractors        
 
20-0212   Reconstruction               5-008-009  10/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0091   Reconstruction               5-008-010  12/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0461   Reconstruction               5-008-011  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0352   Reconstruction               5-008-012  10/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Multi Sports Dugout 1:
22-1063   New Construction             7-018-001  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Multi Sports Dugout 2:
22-1064   New Construction             7-019-001  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Baseball Pressbox&Concess:
22-1065   New Construction             7-020-001  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Multi Sports Pressbox:
22-1066   New Construction             7-021-001  06/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
20-1316   Reconstruction               7-999-003  09/14/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-001           -640                  12/08/22   11/17/23    HJ Brandeles Corp                   
 
22-0161   Reconstruction               7-999-004  09/09/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration:
90-0898   Reconstruction               9-002-001  02/22/91  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1593   Reconstruction               9-002-002  10/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            008                 0                  03/28/11   04/22/11    NATIONAL BUILDING & RESTORATION CORP
 
21-0092   Reconstruction               9-002-004  12/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0462   Reconstruction               9-002-005  04/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE

CLINTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-11-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Clinton Elementary:
91-1216   Reconstruction               0-001-002  05/04/92  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
94-1587   Reconstruction               0-001-003  07/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0050   Reconstruction               0-001-005  07/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1204   Additions and Alterations    0-001-006  09/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-22          -3,625                  03/13/06   05/25/06    George Nole and Sons                
 
00-1861   Reconstruction               0-001-007  06/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA1           -11,667                  03/11/04   03/17/04    Midlantic Environmental             
 
08-1001   Reconstruction               0-001-008  06/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-05           15,414                  01/14/11   02/18/11    PONCELL CONSTRUCTION COMPANY INC    
                                                            2-01A         -76,553                  03/02/10   05/14/10    PULVER ROOFING CO INC               
                                                            2-03           -2,930                  03/16/10   04/16/10    PULVER ROOFING CO INC               
                                                            2-04           17,002                  01/10/11   02/15/11    SCHARF PLUMBING & HEATING INC       
 
09-1001   Reconstruction               0-001-009  11/12/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0701   Reconstruction               0-001-010  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1-001             148                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            1-01          -17,706                  03/02/16   03/03/16    CUNNINGHAM EXCAVATION               
                                                            100-002             0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            100-007             0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            100-01              0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            2-001          31,700                  03/02/16   03/03/16    J.PRIORE CONSTRUCTION CO.INC        
                                                            2-002          16,490                  05/28/15   06/17/15    National Building & Restoration Corp
                                                            2-003         107,689                  06/15/15   02/29/16    National Building & Restoration     
                                                            2-003          26,144                  03/02/16   03/03/16    J.PRIORE CONSTRUCTION CO.INC        
                                                            2-04           26,179                  03/02/16   03/03/16    J.PRIORE CONSTRUCTION CO.INC        
                                                            201-01              0                  02/29/16   03/03/16    J. Priore Construction Company, Inc.
                                                            3-01          -68,745                  12/23/14   01/07/15    Two Brothers Contracting, Inc.      
                                                            3-02           -2,478                  05/29/15   06/11/15    Two Brothers Contracting Inc.       
                                                            300-001             0                  12/23/14   01/07/15    Two Brothers Contracting, Inc.      
                                                            300-002             0                  12/23/14   01/07/15    Two Brothers Contracting, Inc.      
                                                            301-01              0                  02/29/16   03/03/16    Schmalz Mechanical Contractors      
                                                            301-03              0                  08/31/15   09/03/15    Schmalz Mechanical Contractors      
                                                            301-03              0                  02/29/16   03/03/16    Schmalz Mechanical Contractors      
                                                            302-001             0                  12/23/14   01/07/15    Two Brothers Contracting, Inc.      
                                                            303-001             0                  12/23/14   01/07/15    Two Brothers Contracting, Inc.      
                                                            304-001             0                  12/23/14   01/07/15    Two Brothers Contracting, Inc.      
                                                            305-001             0                  12/23/14   01/07/15    Two Brothers Contracting, Inc.      
                                                            4-001             531                  03/02/16   03/03/16    HJ BRANDELES CORP.                  
                                                            4-002             925                  03/02/16     /  /      HJ BRANDELES CORP.                  
                                                            401-01              0                  02/29/16   03/03/16    H.J. Brandeles Corporation          
                                                            401-02              0                  08/31/15   09/03/15    H.J. Brandeles Corporation          
                                                            5-001          14,379                  08/31/15   09/03/15    SC Spencer Electric, Inc.           
                                                            5-002          11,917                  08/31/15   09/03/15    SC Spencer Electric, Inc.           
                                                            501-01              0                  02/29/16   03/03/16    SC Spencer Electric, Inc.           
                                                            501-04              0                  02/29/16   03/03/16    SC Spencer Electric, Inc.           
                                                            6-01          -82,750                  03/02/16   03/03/16    RSI ROOFING,INC                     
 
13-1444   Reconstruction               0-001-011  06/23/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,904                  06/10/15   08/05/15    Putrelo Building Enterprises        
 
15-1778   Reconstruction               0-001-012  06/28/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01             630                  12/12/17   02/13/18    C.W. Site Development, LLC          
                                                            01-02         -18,680                  12/12/17   02/13/18    C.W. Site Development, LLC          
 
17-0410   Reconstruction               0-001-013  11/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01           9,977                  08/27/19   09/30/19    CENTRAL NY CONSTRUCTION, INC.       
                                                            01-06          17,814                  11/08/19   01/17/20    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            02-01          23,702                  08/27/19   09/30/19    R.E. ALEXANDER CO.,INC.             
                                                            02-02          29,978                  09/17/19   09/27/19    R.E. ALEXANDER CO.,INC.             
                                                            02-03           4,114                  09/17/19   09/27/19    R.E. ALEXANDER CO.,INC.             
                                                            02-04          13,397                  09/17/19   09/27/19    R.E. ALEXANDER CO.,INC.             
                                                            02-05          19,343                  11/08/19   01/17/20    R.E ALEXANDER CO.,INC.              
                                                            02-07          14,824                  11/08/19   01/17/20    R.E. ALEXANDER CO.,INC.             
                                                            05-01           8,445                  09/15/20   11/25/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            05-06           3,264                  09/15/20   11/25/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            06-04          -2,817                  12/15/20   03/04/21    ONEIDA ELECTRICAL CONTRACTORS, INC. 
 

          Middle School:
94-1588   Reconstruction               0-002-003  07/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0051   Reconstruction               0-002-005  07/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1492   Reconstruction               0-002-006  05/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1205   Additions and Alterations    0-002-007  09/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1              -700                  01/09/04   04/26/04    Huen New York                       
                                                            E-10           -3,663                  04/22/04   04/26/04    Huen New York                       
                                                            E-12           -4,951                  04/22/04   04/26/04    Huen New York                       
                                                            E-13           -1,119                  05/24/04   05/27/04    Huen New York                       
                                                            E-2                 0                  01/15/04   01/29/04    Huen New York                       
                                                            E-3               -52                  01/15/04     /  /      Huen New York                       
                                                            E-4              -104                  01/15/04   01/29/04    Huen New York                       
                                                            E-6                 0                  01/15/04   01/29/04    Huen New York                       
                                                            E-7                 0                  01/29/04   02/25/04    Huen New York                       
                                                            E-8                 0                  01/29/04   02/25/04    Huen New York                       
                                                            E15            -2,614                  07/18/05   08/02/05    Huen new York                       
                                                            E17             3,339                  07/18/05   08/02/05    Huen new York                       
                                                            GC-1                0                  03/24/03   04/17/03    George Nole & Sons                  
                                                            GC-10         -57,788                  09/19/03   10/03/03    George Nole & Sons                  
                                                            GC-11           3,309                  03/02/04   03/08/04    George Nole & Sons                  
                                                            GC-12           8,738                  03/02/04   03/08/04    George Nole & Sons                  
                                                            GC-14           2,925                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-15           8,527                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-17           1,912                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-19             352                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-2           -4,000                  12/01/03   03/15/04    George Nole & Sons                  
                                                            GC-20           1,121                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-21           6,400                  04/28/04   05/11/04    George Nole & Sons                  
                                                            GC-21           3,668                  03/13/06   05/25/06    george Nole and Sons                
                                                            GC-22          -1,168                  07/02/04   07/27/04    George Nole & Sons                  
                                                            GC-24           1,597                  07/02/04   07/27/04    George Nole & Sons                  
                                                            GC-25           2,801                  07/02/04   07/27/04    George Nole & Sons                  
                                                            GC-26          11,806                  07/18/05   08/02/05    George Nole and sons                
                                                            GC-27           3,807                  07/18/05   08/02/05    George Nole and Son                 
                                                            GC-28           3,612                  08/18/05   08/02/05    george Nole and Son                 
                                                            GC-5           -2,603                  09/19/03   10/03/03    George Nole & Sons                  
                                                            GC-6                0                  09/19/03   10/03/03    George Nole & Sons                  
                                                            GC-7              -51                  07/13/05   07/22/05    george nole and Son                 
                                                            GC-8           -1,067                  09/19/03   10/03/03    George Nole & Sons                  
                                                            GC-9          -10,374                  09/19/03   10/03/03    George Nole & Sons                  
                                                            M-1            14,339                  12/05/02   12/09/02    HJ Brandeles                        
                                                            M-3            -2,250                  01/15/04   02/26/04    HJ Brandeles                        
                                                            M-4            -5,149                  05/21/04   05/27/04    HJ Brandeles                        
                                                            M-5              -778                  05/21/04   05/27/04    HJ Brandeles                        
                                                            M-6              -554                  05/21/04   05/27/04    HJ Brandeles                        
                                                            M7            -32,400                  07/18/05   08/02/05    HJ Brandeles Corp                   
                                                            P-5                 0                  07/21/04   07/27/04    Bellucci Enterprises                
                                                            P-6            32,979                  07/21/04   07/27/04    Bellucci Enterprises                
                                                            TE-1            7,540                  03/28/06   07/21/06    Syracuse Scenery and Stage          
 
00-1862   Reconstruction               0-002-008  06/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA3                 0                  03/11/04   03/17/04    Midlantic Environ.                  
 
08-1002   Reconstruction               0-002-009  06/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02          -89,940                  02/16/10   04/16/10    R.E. ALEXANDER CO INC               
                                                            1-03           -9,866                  05/10/10   07/16/10    R.E. ALEXANDER CO INC               
                                                            1-03            7,303                  01/14/11   02/18/11    PONCELL CONSTRUCTION COMPANY INC    
                                                            1-04            7,900                  01/14/11   02/18/11    PONCELL CONSTRUCTION COMPANY INC    
                                                            2-01          -10,918                  07/13/10   09/07/10    SCHARF PLUMBING & HEATING INC       
                                                            2-03           25,516                  01/10/11   02/15/11    SCHARF PLUMBING & HEATING INC       
                                                            3-01R           8,230                  03/16/10   04/16/10    EMERALD ELECTRICAL CONTRACTORS INC  
                                                            3-03R          10,304                  05/07/10   08/05/10    EMERALD ELECTRICAL CONTRACTORS INC  
 
09-1002   Reconstruction               0-002-010  11/12/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0702   Reconstruction               0-002-011  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            100-003             0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            100-004             0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            100-005             0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            100-006             0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            100-008             0                  05/29/15   06/11/15    Central New York Construction, Inc. 
                                                            100-009             0                  05/29/15     /  /      Central New York Construction, Inc. 
                                                            2-001           3,200                  05/28/15   07/30/15    National Building & Restoration     
                                                            200-001             0                  05/28/15   07/30/15    National Building & Restoration     
                                                            204-001             0                  05/28/15   07/30/15    National Building & Restoraton      
                                                            3-02           -2,478                  12/23/14   01/07/15    H.R. Beebe, Inc.                    
 
13-0516   Reconstruction               0-002-012  07/20/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-01              0                  03/20/14   07/03/14    Putrelo Building Enterprises, Inc.  
                                                            100-02              0                  03/20/14   07/03/14    Putrelo Building Enterprises, Inc.  
                                                            100-03              0                  03/20/14   07/03/14    Putrelo Building Enterprises, Inc.  
                                                            101-01              0                  11/25/15   12/28/15    Putrelo Building Enterprise, Inc.   
                                                            B-001          21,400                  11/25/15   12/28/15    Putrelo Building Enterprises, Inc.  
 
15-1779   Reconstruction               0-002-013  07/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0411   Reconstruction               0-002-014  11/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             1,976                  09/15/20   11/25/20    ONEIDA ELECTRICAL CONTRACTORS, INC. 
                                                            01-05          15,775                  08/27/19   09/27/19    CENTRAL NY CONSTRUCTION, INC.       
                                                            02-08          13,349                  11/08/19   01/17/20    R.E. ALEXANDER CO.,INC.             
                                                            05-02           3,603                  09/15/20   11/25/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            05-07          -4,256                  12/09/20   02/23/21    SCHMALZ MECHANICAL CONTRACTORS, INC.
 
17-1943   Reconstruction               0-002-015  07/05/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -4,222                  03/29/19   03/29/19    MURNANE BUILDING CONTRACTORS        
 
21-0098   Reconstruction               0-002-016  11/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          20,790                  05/26/22   01/30/23    Putrelo Bldg Entrps                 
                                                            GC-02          21,945                  05/26/22   01/30/23    Putrelo Bldg Entrps                 
 
22-1689   Reconstruction               0-002-017  12/20/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1837   Reconstruction               0-002-018  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
94-1589   Reconstruction               0-005-002  07/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0052   Reconstruction               0-005-004  07/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1206   Additions and Alterations    0-005-005  09/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1                 0                  01/15/04   01/29/04    Huen New York                       
                                                            E-11           -3,663                  04/22/04   04/26/04    Huen New York                       
                                                            E-14           -1,678                  05/22/04   05/27/04    Huen New York                       
                                                            E-16            9,874                  07/18/05   08/02/05    Huen new York                       
                                                            E-2                 0                  01/15/04   01/29/04    Huen New York                       
                                                            E-5              -569                  01/15/04     /  /      Huen New York                       
                                                            E-9            -2,205                  03/11/04   04/26/04    Huen New York                       
                                                            E3              7,765                  07/13/05   07/22/05    Huen New York                       
                                                            E4              8,193                  07/13/05   07/22/05    Huen new York                       
                                                            E5              1,545                  07/13/05   07/22/05    Huen New York                       
                                                            E6                634                  07/13/05   07/22/05    Huen new York                       
                                                            GC-1                0                  12/01/03   03/15/04    George Nole & Sons                  
                                                            GC-10            -665                  07/13/05   07/22/05    george Nole and Son                 
                                                            GC-11          -6,686                  07/13/05   07/22/05    George Nole and Sons                
                                                            GC-12               0                  07/13/05   07/22/05    George Nole and Son                 
                                                            GC-13           4,833                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-14           3,551                  07/13/05   07/22/05    George Nole and Sons                
                                                            GC-15          21,842                  03/13/06   05/25/06    George Nole and Sons                
                                                            GC-16           1,054                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-16          -1,270                  03/13/06   05/25/06    george Nole and sons                
                                                            GC-17           3,950                  03/13/06   05/25/06    George Nole Sons                    
                                                            GC-18         -14,000                  04/22/04   04/26/04    George Nole & Sons                  
                                                            GC-18         -14,802                  03/13/06   05/25/06    george Nole and sons                
                                                            GC-19             203                  03/13/06   05/25/06    George Nole and sons                
                                                            GC-2           44,000                  03/24/03   04/17/03    George Nole & Sons                  
                                                            GC-20           1,650                  03/13/06   05/25/06    George Nole and Sons                
                                                            GC-23          -3,000                  07/02/04   07/27/04    George Nole & Sons                  
                                                            GC-23          -3,995                  03/13/06   05/25/06    george Nole And Sons                
                                                            GC-24          -9,353                  03/13/06   05/26/06    George nole and Sons                
                                                            GC-3            8,726                  03/24/03   04/17/03    George Nole & Sons                  
                                                            GC-3           -1,662                  05/21/04   05/27/04    George Nole & Sons                  
                                                            GC-4            5,062                  03/24/03   04/17/03    George Nole & Sons                  
                                                            GC-4             -401                  05/21/04   05/27/04    George Nole & Sons                  
                                                            GC-6           -1,209                  07/13/05   07/22/05    George Nole and Son                 
                                                            GC-7           -3,168                  09/19/03   10/03/03    George Nole & Sons                  
                                                            GC-8                0                  08/13/05   07/22/05    George Nole and Son                 
                                                            GC-9                0                  08/13/05   07/22/05    George Nole and Sons                
                                                            GC5                 0                  07/13/05   07/22/05    George nole Son                     
                                                            Gc-13            -832                  07/13/05   07/22/05    george Nole and Son                 
                                                            M-1                 0                  05/07/03   05/08/03    Giruzzi Plumbing                    
                                                            M-2             4,670                  12/05/02   12/09/02    HJ Brandeles                        
                                                            M-2            -2,144                  01/15/04   05/09/06    Giruzzi Plumbing                    
                                                            M-3            -3,000                  01/15/04   01/29/04    Giruzzi Plumbing                    
                                                            M-4            -3,565                  03/07/05   03/24/05    Giruzzi Plumbing Heating            
                                                            P-1                 0                  12/01/03   03/15/04    Bellucci Ent.                       
                                                            P-2                 0                  04/11/03   04/21/03    Bellucci Ent.                       
                                                            P-3            -5,565                  03/02/04   04/22/04    Bellucci Ent.                       
                                                            P-4                 0                  07/21/04   07/27/04    Bellucci Ent.                       
                                                            P2                  0                  05/24/05   07/21/05    Bellucci Enterprises                
                                                            P3             -5,074                  05/24/05   07/21/05    Bellucci Enterprises                
 
00-1863   Reconstruction               0-005-006  06/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA2            -4,520                  03/11/04   03/17/04    Midlantic Environmental             
 
07-1273   Reconstruction               0-005-007  09/16/07  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1003   Reconstruction               0-005-008  06/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -42,744                  02/02/10   04/16/10    R.E. ALEXANDER CO INC               
                                                            1-01          -28,846                  07/15/10   09/03/10    PONCELL CONSTRUCTION COMPANY INC    
                                                            1-02           10,494                  01/14/11   02/18/11    PONCELL CONSTRUCTION COMPANY INC    
                                                            2-01B         -51,875                  03/02/10   05/14/10    PULVER ROOFING CO INC               
                                                            2-02          -50,527                  10/06/09   05/14/10    PULVER ROOFING CO INC               
                                                            2-02          -50,527                  03/02/10     /  /      PULVER ROOFING CO INC               
                                                            2-02          -11,788                  07/13/10   09/07/10    SCHARF PLUMBING & HEATING INC       
                                                            2-04           -4,064                  03/16/10   04/16/10    PULVER ROOFING CO INC               
                                                            2-05            1,830                  01/10/11   02/15/11    SCHARF PLUMBING & HEATING INC       
                                                            2-06           -1,244                  01/25/11   02/24/11    SCHARF PLUMBING & HEATING INC       
                                                            3-02R           4,738                  03/16/10   04/16/10    EMERALD ELECTRICAL CONTRACTORS INC  
                                                            3-04            8,964                  05/07/10   08/05/10    EMERALD ELECTRICAL CONTRACTORS INC  
 
09-1003   Reconstruction               0-005-009  11/12/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0703   Reconstruction               0-005-010  06/06/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            101-01              0                  08/31/15   09/03/15    Cunningham Excavation               
                                                            101-02              0                  02/29/16   03/03/16    Cunningham Excavation               
                                                            2-002           2,861                  12/05/15   01/06/16    J. Priore Construction Co.., Inc.   
                                                            2-005          -1,375                  12/05/15   01/06/16    National Building & Restoration     
                                                            2-05           11,403                  12/05/15   01/06/16    J. Priore Construction Co., Inc.    
                                                            201-02              0                  02/29/16   03/03/16    J. Priore Construction Company, Inc.
                                                            201-03              0                  08/31/15   09/03/15    J. Priore Construction Company, Inc.
                                                            3-01           -7,113                  12/05/15   01/06/16    Schmalz Mechanical Contractors      
                                                            301-02              0                  08/31/15   09/03/15    Schmalz Mechanical Contractors      
                                                            401-03              0                  02/29/16   03/03/16    J.J. Brandeles Corporation          
                                                            5-003         -23,729                  12/05/15   01/06/16    SC Spencer Electric, Inc.           
                                                            5-04              839                  12/05/15   01/06/16    SC Spencer Electric, Inc.           
                                                            501-02              0                  02/29/16   03/03/16    SC Spencer Electric, Inc.           
                                                            501-03              0                  08/31/15   09/03/15    SC Spencer Electric, Inc.           
 
13-0517   Reconstruction               0-005-011  07/20/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            100-04              0                  03/20/14   07/03/14    Putrelo Building Enterprises, Inc.  
 
15-1780   Reconstruction               0-005-012  07/12/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PBE-1          -2,260                  05/17/17   05/13/19    Putrelo Building Enterprises        
 
17-0412   Reconstruction               0-005-013  11/06/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            11,615                  09/15/20   11/25/20    ONEIDA ELECTRICAL CONTRACTORS, INC. 
                                                            01-02          23,900                  08/27/19   09/30/19    CENTRAL NY CONSTRUCTION, INC.       
                                                            01-03          20,572                  08/27/19   09/27/19    CENTRAL NY CONSTRUCTION, INC.       
                                                            01-04           7,500                  08/27/19   09/27/19    CENTRAL NY CONSTRUCTION, INC.       
                                                            01-07          22,702                  12/09/20   03/10/21    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            01-08          -1,232                  12/09/20   03/10/21    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            02-06          11,483                  11/08/19   01/17/20    R.E. ALEXANDER CO.,INC.             
                                                            02-09         -44,295                  12/09/20   03/10/21    R.E. ALEXANDER CO.,INC.             
                                                            03-01         -29,481                  12/09/20   03/10/21    UTICA GLASS CO.                     
                                                            04-01         -14,557                  12/09/20   02/23/21    H.J. BRANDELES                      
                                                            05-03           2,499                  09/15/20   11/25/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            05-04           5,667                  09/15/20   11/25/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            05-05           3,255                  09/15/20   11/25/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            05-08          -2,196                  12/15/20   03/04/21    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            06-03           7,059                  12/15/20   03/04/21    ONEIDA ELECTRICAL CONTRACTORS, INC. 
 
18-0679   Reconstruction               0-005-014  05/20/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SSBA-01         5,556                  12/09/20   02/23/21    ONEIDA ELECTRICAL CONTRACTORS, INC. 
                                                            SSBA-02       -40,000                  12/15/20   03/04/21    ONEIDA ELECTRICAL CONTRACTORS, INC. 
 
21-0099   Reconstruction               0-005-016  11/17/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           6,396                  12/21/22   12/01/23    Huen Elec Inc                       
                                                            EC-02          23,648                  12/21/22   12/01/23    Huen Elec Inc                       
                                                            GC-03         -11,459                  12/21/22   12/06/23    Putrelo Bldg Entrps                 
 

          Pool Changing Rm & Service Bldg.:
00-1208   New Construction             7-008-001  09/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1864   Reconstruction               7-008-002  06/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-4          -14,000                  05/24/05   06/21/05    Midlantic Environmental             
 

          Toilet & Service Bldg.:
00-1207   New Construction             7-009-001  09/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE

NEW HARTFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-15-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Oxford Rd. ES/SHS:
92-1110   Reconstruction               0-005-003  06/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1023   Reconstruction               0-005-004  05/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1517   Reconstruction               0-005-005  06/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1340   Reconstruction               0-005-007  05/28/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1811   Reconstruction               0-005-008  08/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1346   Reconstruction               0-005-009  09/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            012                 0                  07/16/04   07/21/04    Bilbern Construction                
                                                            013             5,088                  07/16/04   07/21/04    Bilbern Construction                
                                                            E-005           9,030                  06/20/02   07/05/02    Edgeline Elec.                      
                                                            E-008           2,190                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            E-009          31,000                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            E-010           1,572                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            E-013           2,270                  05/16/06   07/27/06    Edgeline Electric                   
                                                            E/Allow1          991                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            GC-001         -9,345                  08/15/02   11/01/02    Bilbern Construction                
                                                            GC-006              0                  05/14/03   05/21/03    Bilbern Construction                
                                                            GC-012              0                  07/16/04   09/16/04    Bilbern Construction                
                                                            GC-013         10,176                  07/16/04   09/16/04    Bilbern Construction                
                                                            GC-014         -4,486                  07/16/04   07/21/04    Bilbern Construction                
                                                            P-002           9,767                  02/24/03   03/06/03    Scharf Plumbing                     
                                                            P-002           9,767                  02/24/03   04/24/03    Scharf Plumbing                     
                                                            P/Allow           313                  08/15/02   02/10/03    Scharf Plumbing                     
                                                            P/Allow2        1,090                  02/10/03   02/24/03    Scharf Plumbing                     
                                                            S-001           9,674                  12/16/02   01/09/03    Delaney Construction                
                                                            S-002           3,575                  12/16/02   01/09/03    Delaney Construction                
                                                            S-004               0                  01/22/03   02/05/03    Delaney Construction                
                                                            S-006               0                  01/22/03   02/05/03    Delaney Construction                
                                                            S-007             805                  01/22/03   02/05/03    Delaney Construction                
                                                            S-008               0                  01/22/03   02/05/03    Delaney Construction                
                                                            S-009               0                  01/22/03   02/05/03    Delaney Construction                
                                                            S-011               0                  01/22/03   02/05/03    Delaney Construction                
                                                            S-012               0                  03/19/03   03/24/03    Delaney Construction                
                                                            S-013               0                  03/19/03   03/24/03    Delaney Construction                
                                                            S-014             296                  02/04/03   02/10/03    Delaney Construction                
                                                            S-015           4,767                  02/04/03   02/10/03    Delaney Construction                
                                                            S-016           3,020                  02/04/03   02/10/03    Delaney Construction                
                                                            S-017           2,899                  03/19/03   03/24/03    Delaney Construction                
                                                            S-018          10,579                  11/19/04   12/06/04    Delaney Construction                
                                                            S-019             451                  11/19/04   12/06/04    Delaney Construction                
                                                            S-022          14,809                  11/19/04   12/06/04    Delaney Construction                
                                                            S-023           1,225                  06/16/03   07/11/03    Delaney Construction                
                                                            S-026           1,328                  11/19/04   12/06/04    Delaney Construction                
                                                            S-027           2,878                  11/19/04   12/06/04    Delaney Construction                
                                                            S-028            -900                  11/19/04   12/06/04    Delaney Construction                
                                                            S-029             500                  11/19/04   12/06/04    Delaney Construction                
 
01-0442   Reconstruction               0-005-010  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E2-001              0                  06/16/03   07/11/03    Kogut Electric                      
                                                            E2-002              0                  06/16/03   07/11/03    Kogut Electric                      
                                                            E2-006              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-009         10,457                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-016              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-018              0                  08/10/04   09/27/04    Kogut Electric                      
                                                            E2-019              0                  08/10/04   09/27/04    Kogut Electric                      
                                                            E2-022              0                  08/10/04   09/27/04    Kogut Electric                      
                                                            E2-023         -3,000                  06/30/08   10/21/08    Kogut Electric                      
                                                            E2-024         -1,609                  08/10/04   09/09/04    Kogut Electric                      
                                                            GC2-002             0                  05/15/03   05/23/03    Putrelo Const.                      
                                                            GC2-005             0                  06/30/08   02/06/09    Putrelo Construction                
                                                            GC2-008             0                  01/08/04   03/17/04    Putrelo Const.                      
                                                            GC2-009             0                  01/08/04   03/17/04    Putrelo Const.                      
                                                            GC2-010         4,563                  01/08/04   03/17/04    Putrelo Const.                      
                                                            GC2-015         3,704                  01/08/04   03/17/04    Putrelo Const.                      
                                                            GC2-017         3,275                  02/13/04   04/07/04    Putrelo Const.                      
                                                            GC2-018         6,196                  02/13/04   04/07/04    Putrelo Const.                      
                                                            GC2-026         5,964                  02/12/10   05/10/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC2-028         2,144                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC2-029        -6,000                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            H2-002              0                  10/31/03   09/09/04    HJ Brandeles                        
                                                            H2-004              0                  11/25/03   01/09/04    HJ Brandeles                        
                                                            H2-006              0                  12/31/03   01/21/04    HJ Brandeles                        
                                                            H2-008              0                  08/10/04   09/09/04    HJ Brandeles                        
                                                            H2-009              0                  08/10/04   09/09/04    HJ Brandeles                        
                                                            H2-010         -1,883                  06/30/08   08/27/08    H.J. Brandeles                      
                                                            LE2-001             0                  01/21/04   01/28/04    Kernan Library Office Group         
                                                            P2-003          8,761                  01/02/03   01/21/04    HJ Brandeles                        
 
02-0517   Additions and Alterations    0-005-011  07/09/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E3-001         16,733                  10/04/04   10/18/04    Madonia Elec.                       
                                                            E3-002              0                  04/04/05   06/21/05    Madonia electric                    
                                                            E3-004              0                  05/04/05   06/21/05    Madonia electric                    
                                                            E3-005              0                  04/04/05   06/21/05    Madonia Electric                    
                                                            E3-006              0                  04/04/05   05/02/05    Madonia Electric                    
                                                            E3-008              0                  06/30/08   10/21/08    Madonia Electric                    
                                                            E3-009              0                  06/30/08   10/21/08    Madonia Electric                    
                                                            E3-010          1,844                  03/15/07   10/23/07    Madonia Electric                    
                                                            E3-011          1,591                  06/15/07   10/23/07    Madonia electric                    
                                                            E3-014a         8,184                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-014b         6,824                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-018            847                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-020          1,959                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-023         -3,000                  07/16/07   10/23/07    Madonia Electric                    
                                                            GC3-002         1,425                  07/28/04   09/09/04    Putrelo Const.                      
                                                            GC3-003         1,756                  07/28/04   09/09/04    Putrelo Const.                      
                                                            GC3-004         1,920                  07/28/04   09/09/04    Putrelo Const.                      
                                                            GC3-008             0                  04/04/05   06/21/05    Puterlo Construction                
                                                            GC3-009             0                  04/04/05   06/21/05    Puterlo Construction Co             
                                                            GC3-011         1,638                  04/04/05   06/21/05    Puterlo Construction                
                                                            GC3-012         6,380                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-014         3,707                  05/04/05   06/21/05    Puterlo Construction                
                                                            GC3-015         2,217                  04/04/05   06/21/05    Puterlo Construction                
                                                            GC3-016         5,814                  05/22/06   07/14/06    Puterlo Construction Co             
                                                            GC3-018        32,130                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-019         9,975                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-021         1,502                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-023         3,090                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-024         5,430                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-025         4,623                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-026         3,478                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-027         2,793                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-028         1,484                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-029         2,095                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-031`          440                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-032        14,239                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-034         1,401                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-037         8,676                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-038         3,982                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-039         6,269                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-040       -10,000                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-041         5,246                  06/25/07   07/17/07    Puterlo Construction                
                                                            GC3-042         9,660                  06/25/07   07/17/07    Puterlo Construction                
                                                            GC3-043        -2,100                  06/25/07   07/17/07    Puterlo Construction                
                                                            H3-001          2,205                  07/28/04   09/09/04    CNY Mech.                           
                                                            H3-002          6,028                  12/06/04   12/10/04    CNY Mech.                           
                                                            H3-004          1,773                  12/06/04   12/10/04    CNY Mech.                           
                                                            H3-005          1,942                  11/15/04   12/06/04    CNY Mech.                           
                                                            H3-006          1,755                  11/15/04   12/06/04    CNY Mech.                           
                                                            H3-008          1,073                  11/08/04   12/06/04    CNY Mech.                           
                                                            H3-010            658                  11/08/04   12/06/04    CNY Mech.                           
                                                            H3-012          2,674                  11/08/04   12/06/04    CNY Mech.                           
                                                            H3-014              0                  04/04/05   06/21/05    CNY Mechanical Associates           
                                                            H3-016         24,428                  02/02/05   03/18/05    CNY mechanical Associates           
                                                            H3-017          6,056                  03/26/10   05/26/10    CNY MECHANICAL ASSOCIATES INC       
                                                            H3-018              0                  04/04/05   06/21/05    CNY Mechanical Associates           
                                                            H3-020              2                  03/26/10   05/26/10    CNY MECHANICAL ASSOCIATES INC       
                                                            H3-024            616                  03/26/10   05/26/10    CNY MECHANICAL ASSOCIATES INC       
                                                            H3-026          3,922                  03/26/10   05/26/10    CNY MECHANICAL ASSOCIATES INC       
                                                            H3-13               0                  04/04/05   06/21/05    CNY Mechanical Associates           
                                                            P3-003          2,907                  06/15/07   10/23/07    LaFrance Plumbing Heating           
                                                            P3-005              0                  09/14/04   12/24/04    LaFrance Plumbing                   
                                                            P3-006              0                  06/25/07   10/26/07    LaFrance Plumbing Heating           
                                                            P3-010          3,660                  06/25/07   10/26/07    LAFrance Plumbing Heating           
                                                            P3-014         16,440                  06/25/07   10/26/07    LaFrance Plumbing Heating           
                                                            P3-015         15,317                  06/25/07   10/26/07    LAFrance Plumbing Heating           
                                                            P3-016          7,500                  06/25/07   10/26/07    LaFrance Plumbing                   
                                                            S3-004          5,920                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-008          3,749                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-011          2,875                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-014         -3,000                  06/30/08   03/16/09    Roberts Construction                
                                                            S3-015         26,169                  06/30/08   02/06/09    Roberts Construction                
 
03-1644   Reconstruction               0-005-013  06/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,602                  05/31/05   06/21/05    Two Brothers Contracting            
 
05-1135   Reconstruction               0-005-014  09/22/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E4-01           8,000                  12/31/07   04/03/08    Patricia Electric                   
                                                            E4-02           3,508                  12/31/07   04/03/08    Patricia Electric                   
                                                            E4-05             857                  01/19/10   03/04/10    PATRICIA ELECTRIC INC               
                                                            G4-01           2,930                  01/28/08   03/19/08    PUTRELO CONSTRUCTION CO. INC        
                                                            G4-03           3,492                  01/19/10   03/04/10    PUTRELO CONSTRUCTION CO INC         
                                                            G4-05               0                  01/19/10   03/04/10    Putrelo Const. Co. Inc              
                                                            G4-06         -43,306                  06/27/08   08/26/08    Putrelo Construction                
                                                            H4-01          -1,400                  01/28/08   08/12/08    SCHMALZ MECHANICAL CONTRACTORS, INC 
                                                            H4-02           3,255                  01/28/08   08/12/08    SCHMALZ MECHANICAL CONTRACTORS      
                                                            H4-05             858                  02/08/08   08/08/08    schalz mechical contractors         
                                                            H4-06           2,625                  01/19/10   03/04/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            P4-02           1,265                  01/19/10   03/04/10    SCHMALZ MECHANICAL CONTRACTORS INC  
 
07-0694   Additions and Alterations    0-005-015  05/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001         -12,427                  11/10/11   06/19/19    RIDLEY ELECTRIC CO INC              
                                                            E-002           5,235                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-003         -19,218                  09/18/09   11/10/09    RIDLEY ELECTRIC CO INC              
                                                            E-004          -2,204                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-005          -7,352                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-006             768                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-007           9,282                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-008           6,099                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-009           3,670                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-010             671                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-011             485                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-012             629                  07/29/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            E-013          -5,817                  12/21/09   02/05/10    RIDLEY ELECTRIC CO.                 
                                                            E-014           3,692                  12/21/09   02/05/10    RIDLEY ELECTRIC                     
                                                            E-015           2,811                  12/21/09   02/05/10    RIDLEY ELECTRIC                     
                                                            E-016          -4,818                  12/21/09   02/05/10    RIDLEY ELECTRIC                     
                                                            E-017           4,223                  12/21/09   02/05/10    RIDLEY ELECTRIC                     
                                                            E-018           6,692                  12/21/09   02/05/10    RIDLEY ELECTRIC                     
                                                            E-019           6,776                  12/21/09   02/05/10    RIDLEY ELECTRIC                     
                                                            E-020          12,393                  12/21/09   02/05/10    RIDLEY ELECTRIC                     
                                                            E-021           4,346             350  04/27/10   09/04/12    RIDLEY ELECTRIC CO INC              
                                                            E-022           6,052             185  04/27/10   09/04/12    RIDLEY ELECTRIC CO INC              
                                                            E-023           6,955                  05/14/10   08/27/10    RIDLEY ELECTRIC CO INC              
                                                            E-024          -2,136                  05/14/10   08/27/10    RIDLEY ELECTRIC CO INC              
                                                            E-025           2,249                  09/01/10   12/10/10    RIDLEY ELECTRIC CO INC              
                                                            E-026           5,880                  09/01/10   12/10/10    RIDLEY ELECTRIC CO INC              
                                                            E-027           3,339                  09/01/10   12/10/10    RIDLEY ELECTRIC CO INC              
                                                            E-028           4,475                  09/01/10   12/10/10    RIDLEY ELECTRIC CO INC              
                                                            E-029           9,916                  09/01/10   01/07/11    RIDLEY ELECTRIC CO INC              
                                                            E-030           7,124                  09/01/10   01/07/11    RIDLEY ELECTRIC CO INC              
                                                            E-031         -25,000                  10/04/10   11/12/10    RIDLEY ELECTRIC CO INC              
                                                            E-032           3,979                  03/01/11   03/30/11    RIDLEY ELECTRIC CO INC              
                                                            E-033             626                  03/11/11   03/30/11    RIDLEY ELECTRIC CO INC              
                                                            E-034           1,868                  09/26/11   08/03/12    RIDLEY ELECTRIC CO INC              
                                                            GC-001          5,552                  01/30/09   05/18/09    BETTE & CRING LLC                   
                                                            GC-002          5,551                  01/30/09   05/18/09    BETTE & CRING LLC                   
                                                            GC-003          5,627                  01/30/09   05/18/09    BETTE & CRING LLC                   
                                                            GC-004          6,922                  01/30/09   05/18/09    BETTE & CRING LLC                   
                                                            GC-005          8,123                  07/06/11   09/09/11    BETTE & CRING LLC                   
                                                            GC-006          8,001                  04/10/09   07/29/09    BETTE & CRING, LLC                  
                                                            GC-007       -110,000                  04/27/09   06/01/10    BETTE & CRING LLC                   
                                                            GC-008         15,000                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-009          3,857                  09/18/09   11/10/09    BETTE & CRING LLC                   
                                                            GC-01           2,875                  10/01/10   11/12/10    TRIPLE P PAINTING INC               
                                                            GC-010          2,891                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-011            600                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-012          1,279                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-013          1,776                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-014            783                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-015          2,487                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-016          1,224                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-017            285                  07/29/09   08/18/09    BETTE & CRING LLC                   
                                                            GC-018          5,460                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-019          3,040                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-02           1,356                  10/01/10   11/12/10    TRIPLE P PAINTING INC               
                                                            GC-020            918                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-021          1,310                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-022            299                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-023            460                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-024          5,586                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-025          3,759                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-026         -1,479                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-027         -7,148                  12/08/09   02/05/10    BETTE & CRING                       
                                                            GC-028          1,067                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-029          1,268                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-03            -769                  10/01/10   11/12/10    TRIPLE P PAINTING                   
                                                            GC-030          8,325                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-031          5,099                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-032            937                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-033          1,994                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-034          1,731                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-035          1,091                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-036          5,354                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-037         16,495                  01/08/10   05/10/10    BETTE & CRING LLC                   
                                                            GC-038          4,546                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-039            489                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-04          -4,000                  10/01/10   11/12/10    TRIPLE P PAINTING INC               
                                                            GC-040          1,537                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-041            361                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-042          1,729                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-043          4,752                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-044          7,677                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-045          4,848                  12/08/09   02/02/10    BETTE & CRING LLC                   
                                                            GC-046          8,228                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-047          8,523                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-048          8,691                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-049          7,380                  12/08/09   02/01/10    BETTE & CRING LLC                   
                                                            GC-050            563                  01/08/10   05/10/10    BETTE & CRING LLC                   
                                                            GC-051          6,244                  01/08/10   05/10/10    BETTE & CRING LLC                   
                                                            GC-052          7,388                  01/08/10   05/10/10    BETTE & CRING LLC                   
                                                            GC-053          8,125                  01/08/10   05/10/10    BETTE & CRING LLC                   
                                                            GC-054          6,672                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-055          5,085                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-056          5,297                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-057          7,335                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-058         -4,100                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-059          7,467                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-060          3,880                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-061          6,092                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-062         35,923                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-063          4,582                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-064          3,828                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-065          9,735                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-066          7,289                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-067          8,471                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-068          5,075                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-069          2,362                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-070         14,346                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-071         18,254                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-072          4,955                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-073          7,638                  04/27/10   10/24/12    BETTE & CRING LLC                   
                                                            GC-074          6,046                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-075          8,561                  09/02/10   01/07/11    BETTE & CRING, LLC                  
                                                            GC-076          8,965                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-077          1,216                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-078          7,148                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-079          2,300                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-080         -1,831                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-081          6,566                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-082          8,616                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-083          8,719                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-084         25,563                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-085          7,648                  09/02/10   01/31/12    BETTE & CRING LLC                   
                                                            GC-086          9,000                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-087          1,745                  09/02/10   01/07/11    BETTE & CRING LLC                   
                                                            GC-088          6,010                  10/01/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-089          4,507                  10/01/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-090          6,030                  10/01/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-091          1,141                  10/01/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-092         -7,000                  10/01/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-093          5,326                  11/04/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-094          7,467                  11/04/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-095          6,934                  11/04/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-096          6,655                  11/04/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-097          3,754                  11/04/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-098          1,445                  11/04/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-099          2,566                  11/04/10   11/12/10    BETTE & CRING LLC                   
                                                            GC-100         13,742                  12/05/12   06/19/13    BETTE & CRING LLC                   
                                                            H 008           2,500                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            H-001         -29,000                  05/11/09   06/01/10    H J BRANDELES CORP.                 
                                                            H-002          17,969                  09/17/09   02/18/11    H J BRANDELES CORP                  
                                                            H-003           5,908                  12/08/09   02/05/10    H J BRANDELES CORP                  
                                                            H-004           3,065                  09/18/09   09/23/09    H J BRANDELES CORP                  
                                                            H-005           3,346                  09/17/09   02/18/11    H J BRANDELES CORP                  
                                                            H-006            -500                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            H-007           3,372                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            H-009          -5,522                  12/08/09   02/05/10    H J BRANDELES CORP                  
                                                            H-010           1,463                  01/08/10   05/10/10    H J BRANDELES CORP                  
                                                            H-011           8,227                  04/27/10   08/29/12    HJ BRANDELES CORP                   
                                                            H-012           6,944                  04/27/10   08/29/12    HJ BRANDELES CORP                   
                                                            H-013           6,131                  04/27/10   09/04/12    HJ BRANDELES CORP                   
                                                            H-014           1,948                  04/27/10   09/04/12    HJ BRANDELES CORP                   
                                                            H-015           4,905                  07/06/11   09/09/11    HJ BRANDELES CORP                   
                                                            H-016           3,662                  09/01/10   12/10/10    HJ BRANDELES CORP                   
                                                            H-017           5,730                  09/01/10   12/10/10    HJ BRANDELES CORP                   
                                                            H-018             636                  09/01/10   12/10/10    HJ BRANDELES CORP                   
                                                            H-019           5,117                  10/04/10   11/12/10    HJ BRANDELES CORP                   
                                                            H-020           5,091                  10/04/10   11/12/10    HJ BRANDELES CORP                   
                                                            H-021         -20,000                  10/04/10   11/12/10    HJ BRANDELES CORP                   
                                                            H-022           4,489                  11/04/10   11/12/10    HJ BRANDELES CORP                   
                                                            H-023           3,750                  06/01/12   10/18/13    H.J. BRANDELES CORP                 
                                                            P-002           1,975                  04/10/09   08/14/09    H J BRANDELES CORP                  
                                                            P-003           4,087                  04/10/09   07/29/09    H J BRANDELES CORP                  
                                                            P-004           1,096                  04/10/09   07/29/09    H J BRANDELES CORP                  
                                                            P-005          10,211                  04/27/09   09/23/09    H J BRANDELES CORP                  
                                                            P-006             432                  03/20/09   07/03/09    H J BRANDELES CORP.                 
                                                            P-007         -12,000                  10/10/11   06/19/19    H J BRANDELES CORP                  
                                                            P-008           6,866                  04/27/09   09/23/09    H J BRANDELES CORP                  
                                                            P-009          13,571                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            P-010           1,175                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            P-011           3,317                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            P-012           2,409                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            P-013           2,235                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            P-014           1,195                  09/17/09   09/23/09    H J BRANDELES CORP                  
                                                            P-015             939                  09/17/09   06/01/10    H J BRANDELES CORP                  
                                                            P-016           6,385                  01/08/10   05/10/10    H J BRANDELES CORP                  
                                                            P-017           5,272                  04/27/10   08/29/12    HJ BRANDELES CORP                   
                                                            P-018           1,731                  04/27/10   08/29/12    HJ BRANDELES CORP                   
                                                            P-019           4,395                  09/01/10   12/10/10    HJ BRANDELES CORP                   
                                                            P-020           2,140                  10/04/10   11/12/10    HJ BRANDELES CORP                   
                                                            RC-001          3,975                  05/14/10   08/27/10    PULVER ROOFING CO INC               
                                                            SW-001              0                  12/18/08   02/27/09    RITTER & PARATORE CONTRACTING, INC. 
                                                            SW-002              0                  01/30/09   05/18/09    RITTER & PARATORE CONTRACTING, INC. 
                                                            SW-003              0                  03/20/09   07/03/09    RITTER & PARATORE CONTRACTING, INC. 
                                                            SW-004              0                  09/18/09   11/10/09    RITTER & PARATORE CONTRACTING INC   
                                                            SW-005              0                  09/18/09   11/10/09    RITTER & PARATORE CONTRACTING INC   
                                                            SW-006         13,000                  09/18/09   11/10/09    RITTER & PARATORE CONTRACTING INC   
                                                            SW-007         12,554                  09/18/09   11/10/09    RITTER & PARATORE CONTRACTING INC   
                                                            SW-008         12,415                  09/18/09   11/10/09    RITTER & PARATORE CONTRACTING INC   
                                                            SW-009        -13,940                  11/18/09   12/28/09    RITTER & PARATORE CONTRACTING INC   
                                                            SW-010         19,290                  01/08/10   05/10/10    RITTER & PARATORE CONTRACTING INC   
                                                            SW-011         11,188                  04/27/10   10/24/12    RITTER & PARATORE CONTRACTING INC   
                                                            SW-012          5,157                  01/08/10   05/10/10    RITTER & PARATORE CONTRACTING INC   
                                                            SW-013          8,920                  09/01/11   09/23/11    RITTER & PARATORE CONTRACTING INC   
                                                            SW-014         10,641                  04/27/10   10/24/12    RITTER & PARATORE CONTRACTING INC   
                                                            SW-015         11,781                  07/06/11   09/09/11    RITTER & PARATORE CONTRACTING INC   
                                                            SW-016         18,039                  09/02/10   01/07/11    RITTER & PARATORE CONTRACTING INC   
                                                            SW-017          4,474                  09/02/10   01/07/11    RITTER & PARATORE INC               
                                                            SW-018          4,438                  09/02/10   01/07/11    RITTER & PARATORE CONTRACTING INC   
                                                            SW-019          6,553                  09/01/10   12/10/10    RITTER & PARATORE INC               
                                                            SW-020          5,029                  09/01/10   12/10/10    RITTER & PARATORE CONTRACTING INC   
                                                            SW-021          7,049                  10/04/10   11/12/10    RITTER & PARATORE CONTRACTING INC   
                                                            SW-022         -8,500                  03/01/11   03/30/11    RITTER & PARATORE CONTRACTING INC   
                                                            TE-001        -25,000                  10/04/10   11/12/10    SYRACUSE SCENERY & STAGE LIGHTING CO
                                                            TE-002           -594                  03/01/11   03/30/11    SYRACUSE SCENERY & STAGE LIGHTING CO
                                                            TLF-01              0                  09/01/10   01/07/11    BMI SUPPLY                          
                                                            TLF-02              0                  09/01/10   01/07/11    BMI SUPPLY                          
                                                            TLF-03         -1,171                  09/01/10   01/07/11    BMI SUPPLY                          
                                                            TLSI-01        -5,000                  09/01/10   01/07/11    BMI SUPPLY                          
                                                            TLSI-02         1,698                  08/25/11   02/10/12    BMI SUPPLY                          
 
16-1644   Reconstruction               0-005-016  02/09/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BEI 1         -29,813                  12/12/19   12/31/19    BILLITIER ELECTRIC, INC.            
                                                            MEC 01         17,032                  10/17/19   10/28/19    MURPHY EXCAVATING CORP.             
                                                            MEC 02         34,938                  10/17/19   10/28/19    MURPHY EXCAVATING CORP.             
                                                            MEC 03         27,371                  10/17/19   10/28/19    MURPHY EXCAVATING CORP.             
                                                            MEC 04         34,981                  11/08/19   11/15/19    MURPHY EXCAVATING CORP.             
                                                            MEC 05         33,330                  11/08/19   11/15/19    MURPHY EXCAVATING CORP.             
                                                            MEC 06         25,262                  11/08/19   11/15/19    MURPHY EXCAVATING CORP.             
                                                            MEC 10           -766                  12/05/19   12/13/19    MURPHY EXCAVATING CORP.             
                                                            MEC 11          1,556                  12/05/19   12/13/19    MURPHY EXCAVATING CORP.             
                                                            MEC-07         15,922                  11/15/19   11/20/19    MURPHY EXCAVATING CORP.             
                                                            MEC-08         34,878                  11/15/19   11/20/19    MURPHY EXCAVATING CORP.             
                                                            MEC-09         31,466                  11/15/19   11/20/19    MURPHY EXCAVATING CORP.             
                                                            PBE 1           4,967                  12/12/19   01/02/20    PUTRELO BUILDING4967                
                                                            SBR 1         -10,610                  12/12/19   01/02/20    HJ BRAMDELES CORP.                  
                                                            SBR 1         -44,091                  12/12/19   01/02/20    SANDS BROTHERS ROOFING CO.,INC.     
 
20-1858   Reconstruction               0-005-017  07/13/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1             -1,008                  02/13/23   12/11/23    NORTHERN PIONEER CONTRACTORS        
 
21-2049   Reconstruction               0-005-018  09/19/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1             -4,000                  06/29/23     /  /      UPSTATE COMPANIES                   
 
22-1223   Reconstruction               0-005-019  04/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1436   Reconstruction               0-005-021  05/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hughes Elementary:
92-1111   Reconstruction               0-006-004  06/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1024   Reconstruction               0-006-005  05/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1341   Reconstruction               0-006-006  05/28/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1812   Reconstruction               0-006-007  08/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1345   Reconstruction               0-006-008  09/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001          -1,399                  04/17/02   05/13/02    Edgeline Elec.                      
                                                            E-001          20,184                  04/30/02   05/24/02    Edgeline Elec.                      
                                                            E-002           2,430                  05/21/02   05/29/02    Edgeline Elec.                      
                                                            E-003          51,076                  06/04/02   08/15/02    Edgeline Elec.                      
                                                            E-004          21,870                  06/13/02   11/04/02    Edgeline Elec.                      
                                                            E-006          16,862                  06/30/08   10/21/08    Edgeline Elec.                      
                                                            E-007           4,927                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            E-011          17,779                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            E-012           1,813                  05/16/06   07/27/06    Edgeline electric                   
                                                            E-014           3,420                  06/30/08   10/21/08    Edgeline Elec.                      
                                                            E/Allow1        1,785                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            E/Allow1        1,109                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            E/Allow1          525                  08/29/02   01/08/03    Edgeline Elec.                      
                                                            GC-002              0                  02/10/03   02/26/03    Bilbern Construction                
                                                            GC-003              0                  02/10/03   02/24/03    Bilbern Construction Company        
                                                            GC-005              0                  05/14/03   05/21/03    Bilbern Construction                
                                                            GC-007              0                  05/14/03   05/21/03    Bilbern Construction                
                                                            GC-008              0                  05/14/03   05/21/03    Bilbern Construction                
                                                            GC-009              0                  05/14/03   05/21/03    Bilbern Construction Company        
                                                            GC-010              0                  05/14/03   05/21/03    Bilbern Construction Company        
                                                            GC-011         -3,000                  07/16/04   07/21/04    Bilbern Construction                
                                                            GC-013          5,088                  07/16/04   07/21/04    Bilbern Construction                
                                                            H-001               0                  02/24/03   03/06/03    Scharf Plumbing                     
                                                            H-002               0                  02/24/03   03/06/03    Scharf Plumbing                     
                                                            H-003             230                  05/16/06   07/27/06    Scharf Plumbing Heating             
                                                            H-004         -15,000                  05/16/06   07/14/06    Scharf Plumbing                     
                                                            H-005             855                  05/16/06   07/27/06    Scharf Plumbing Heating             
                                                            H/Allow         1,328                  02/10/03   02/10/03    Scharf Plumbing                     
                                                            H2-001              0                  06/30/08   02/11/09    Scharf Plumbing                     
                                                            P-001           1,389                  08/15/02   11/01/02    Scharf Plumbing                     
                                                            P-003               0                  05/16/06   07/27/06    Scharf Plumbing Heating             
                                                            P-004           1,777                  05/16/06   07/27/06    Scharf Plumbing Heating             
                                                            P-005           6,806                  05/16/06   07/27/06    Scharf Plumbing                     
                                                            S-002           1,525                  01/22/03   02/05/03    Delaney Construction                
                                                            S-003           1,500                  01/22/03   02/05/03    Delaney Construction                
                                                            S-003               0                  02/04/03   02/10/03    Delaney Construction                
                                                            S-005          33,944                  01/22/03   02/05/03    Delaney Construction                
                                                            S-008               0                  01/22/03   03/10/03    Delaney Construction                
                                                            S-010               0                  01/22/03   02/05/03    Delaney Construction                
                                                            S-020          14,101                  11/19/04   12/06/04    Delaney Construction                
                                                            S-021             788                  11/19/04   12/06/04    Delaney Construction                
                                                            S-024           2,435                  06/16/03   07/11/03    Delaney Construction                
                                                            S-025             840                  11/19/04   12/06/04    Delaney Construction                
 
05-1136   Reconstruction               0-006-010  09/22/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E4-03             646                  12/31/07   04/03/08    Patricia Electric                   
                                                            G4-02               0                  01/28/08   03/19/08    PUTRELO CONSTRUCTION CO. INC        
                                                            G4-04             518                  01/19/10   03/04/10    PUTRELO CONSTRUCTION CO INC         
                                                            G4-05           6,250                  01/19/10   03/04/10    PUTRELO CONSTRUCTION CO INC         
                                                            H4-03           1,368                  02/08/08   08/08/08    schmalz mechanical contractors      
                                                            H4-04           1,576                  02/08/08   08/08/08    schmalz mechanical contractors      
                                                            H4-08           9,329                  01/19/10   03/04/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            P4-01           6,758                  12/31/07   04/03/08    Schmalz Mechanical Contractors      
 
16-1645   Reconstruction               0-006-011  02/09/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1224   Reconstruction               0-006-012  04/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Robert E. Myles Elementary:
92-1112   Reconstruction               0-007-004  06/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1025   Reconstruction               0-007-005  05/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1342   Reconstruction               0-007-006  05/28/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1813   Reconstruction               0-007-007  08/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0443   Reconstruction               0-007-008  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E2-001              0                  08/10/04     /  /      Kogut Electric                      
                                                            E2-003              0                  06/30/08   08/27/08    Kogut Electric                      
                                                            E2-005              0                  08/10/04   09/27/04    Kogut Electric                      
                                                            E2-010              0                  06/30/08   10/21/08    Kogut Electric                      
                                                            E2-013              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-014              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-017              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-020              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-021              0                  08/10/04   09/23/04    Kogut Electric                      
                                                            E2-024         -4,827                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-026         -4,414                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-12               0                  01/03/07   01/19/07    Kogut Electric                      
                                                            GC2-001         1,576                  05/15/03   05/23/03    Putrelo Const.                      
                                                            GC2-003         2,448                  05/15/03   05/23/03    Putrelo Const.                      
                                                            GC2-004             0                  06/30/08   10/24/08    Putrelo Const.                      
                                                            GC2-006             0                  06/30/08   02/06/09    Putrelo Construction                
                                                            GC2-007         5,202                  01/08/04   04/07/04    Putrelo Const.                      
                                                            GC2-011         9,345                  01/08/04   04/07/04    Putrelo Const.                      
                                                            GC2-012         9,874                  01/08/04   04/07/04    Putrelo Const.                      
                                                            GC2-014         5,187                  01/08/04   03/17/04    Putrelo Const.                      
                                                            GC2-019         4,200                  02/13/04   04/07/04    Putrelo Const.                      
                                                            GC2-030        -1,250                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC2-031         3,234                  06/15/07   06/20/07    Puterlo Construction                
                                                            H2-005              0                  11/25/03   01/09/04    HJ Brandeles                        
                                                            H2-007              0                  12/31/03   01/21/04    HJ Brandeles                        
                                                            H2-010         -1,883                  06/30/08   08/27/08    HJ Brandeles                        
                                                            Le2-001             0                  01/21/04     /  /      Kernan Library Office Group         
                                                            Le2-002        -3,512                  06/30/08   10/21/08    Kernan Library Office Group         
                                                            P2-002              0                  12/31/03   01/21/04    HJ Brandeles                        
                                                            P2-004            115                  08/10/04   09/09/04    HJ Brandeles                        
                                                            S2-001          7,485                  07/28/03   08/14/03    Murphy Excavating                   
                                                            S2-002              0                  07/18/06   07/27/06    Murphy Excavating                   
                                                            S2-003          4,744                  07/18/06   07/27/06    Murphy Excavating                   
                                                            S2-004              0                  07/18/06   07/27/06    Murphy Excavating                   
                                                            S2-004              0                  01/03/07   01/30/07    Murphy Exvacating                   
                                                            S2-005        -13,750                  01/03/07   01/30/07    Murphy Excavating                   
 
05-1137   Reconstruction               0-007-010  09/22/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H4-03           1,368                  02/08/08   08/08/08    schmalz mechanical contractors      
 
16-1646   Reconstruction               0-007-011  02/09/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1225   Reconstruction               0-007-012  04/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ralph W. Perry Jr. High:
92-1113   Reconstruction               0-008-002  06/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1151   Reconstruction               0-008-003  05/09/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1026   Reconstruction               0-008-004  05/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1343   Reconstruction               0-008-005  05/28/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0444   Reconstruction               0-008-006  06/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E2-004              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-007         95,000                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-008              0                  08/10/04   09/09/04    Kogut Electric                      
                                                            E2-011              0                  01/03/07   01/19/07    Kogut Electric                      
                                                            E2-015              0                  08/10/04   09/27/04    Kogut Electric                      
                                                            E2-016              0                  08/10/04   09/27/04    Kogut Electric                      
                                                            E2-024         -4,827                  08/10/04   09/27/04    Kogut Electric                      
                                                            E2-025        -10,000                  08/10/04   09/27/04    Kogut Electric                      
                                                            GC2-013         1,362                  01/08/04   03/15/04    Putrelo Const.                      
                                                            GC2-016         8,496                  02/13/04   04/07/04    Putrelo Const.                      
                                                            GC2-023        18,877                  02/12/10   05/10/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC2-024         5,210                  02/12/10   05/10/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC2-027        11,000                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            H2-003              0                  10/31/03   12/01/03    HJ Brandeles                        
                                                            H2-010         -1,883                  06/30/08   08/27/08    HJ Brandeles                        
                                                            P2-001              0                  12/31/03   01/21/04    HJ Brandeles                        
 
02-0518   Additions and Alterations    0-008-007  07/09/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3-030           3,104                  05/22/06   07/14/06    Puterlo Construction                
                                                            3-13                0                  05/22/06   07/14/06    Puterlo Construction                
                                                            3-33           15,991                  05/22/06   07/14/06    Puterlo Construction                
                                                            E3-003              0                  04/04/05   06/21/05    Madonia Electric                    
                                                            E3-007              0                  07/16/07   10/23/07    Madonia ELectric                    
                                                            E3-012         15,740                  07/18/06   12/27/06    Madonia Electric                    
                                                            E3-013          9,591                  06/30/08   10/21/08    Madonia Electric                    
                                                            E3-013          9,591                  02/19/10     /  /      MADONIA ELECTRIC INC                
                                                            E3-015              0                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-016              0                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-019          1,820                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-021          1,005                  07/16/07   10/23/07    Madonia Electric                    
                                                            E3-022            909                  07/16/07   10/23/07    Madonia Electric                    
                                                            GC3-001        15,733                  11/15/04   12/06/04    Putrelo Const.                      
                                                            GC3-010         5,472                  04/04/05   06/21/05    Puterlo Construction                
                                                            GC3-017         8,043                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-020             0                  05/22/06   07/14/06    Puterlo Construction                
                                                            GC3-035R        5,102                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            GC3-036         7,467                  01/28/10   02/05/10    PUTRELO CONSTRUCTION CO INC         
                                                            H3-003          1,945                  12/06/04   12/10/04    CNY Mech.                           
                                                            H3-007            134                  11/08/04   12/06/04    CNY Mech.                           
                                                            H3-009            492                  11/08/04   12/06/04    CNY Mech.                           
                                                            H3-011            660                  11/08/04   12/06/04    CNY Mech.                           
                                                            H3-019              0                  04/04/05   06/21/05    CNY mechanical Associates           
                                                            H3-025          4,434                  01/28/10   02/05/10    CNY MECHANICAL ASSOCIATES INC       
                                                            H3-027          1,701                  01/28/10   05/10/10    CNY MECHANICAL ASSOCIATES INC       
                                                            H3-028         -1,000                  03/26/10   05/26/10    CNY MECHANICAL ASSOCIATES INC       
                                                            P3-001          2,304                  11/15/04   12/06/04    LaFrance Plumbing                   
                                                            P3-002          7,500                  11/15/04   12/06/04    LaFrance Plumbing                   
                                                            P3-004              0                  06/15/07   10/23/07    LaFrance Plumbing heating           
                                                            P3-007              0                  06/25/07   10/26/07    LaFrance Plumbing heating           
                                                            P3-008              0                  06/25/07   10/26/07    LAFrance Plumbing                   
                                                            P3-009            482                  06/25/07   10/26/07    LaFrance Plumbing                   
                                                            P3-011          1,094                  06/25/07   10/26/07    LaFrance Plumbing                   
                                                            P3-012          3,314                  06/25/07   10/26/07    LaFrance Plumbing heating           
                                                            P3-013          4,743                  06/25/07   10/26/07    LaFrance Plumbing                   
                                                            S3-001         40,000                  12/10/04   12/23/04    Roberts Construction                
                                                            S3-002              0                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-003          4,004                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-005          5,100                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-006          8,431                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-007          9,563                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-009            600                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-010          8,170                  06/30/08     /  /      Roberts Construction                
                                                            S3-012         -9,465                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-013          1,400                  06/30/08   02/06/09    Roberts Construction                
                                                            S3-016          1,700                  06/30/08   10/27/08    Roberts Construction                
 
05-1138   Reconstruction               0-008-008  09/22/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E4-04             624                  01/19/10   03/04/10    PATRICIA ELECTRIC INC               
                                                            H4-07             490                  02/23/10   04/14/10    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            H4-09          10,885                  02/23/10   03/31/10    SCHMALZ MECHANICAL CONTRACTORS INC  
 
16-1647   Reconstruction               0-008-009  02/09/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building @ Perry Jr. High:
96-0297   New Construction             2-012-001  10/24/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1171   Additions and Alterations    2-012-002  07/08/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lower Bus Garage:
07-0695   Reconstruction               4-002-002  05/13/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-1114   Reconstruction               5-001-001  06/03/93  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0696   Reconstruction               5-001-003  05/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-001         -21,444                  01/30/09   03/17/09    H.J. BRANDELES CORP.                
 
22-1226   Reconstruction               5-001-004  04/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box at SHS:
94-1682   New Construction             7-012-001  07/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
01-0445   Reconstruction               7-999-003  06/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1351   Reconstruction               7-999-005  07/24/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            OEC-1          -3,554                  08/27/19   08/28/19    ONEIDA ELECTRICAL CONTRACTORS, INC. 
 
03-0190FP Reconstruction               7-999-FP1  10/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

NEW YORK MILLS UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-15-04-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          K-12 School:
99-0554   Additions and Alterations    0-002-005  04/05/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-5           1,980                  05/24/01   01/14/02    Avala Contracting                   
                                                            E-1             5,485                  05/24/01   01/14/02    Panko Elec.                         
                                                            E-2             7,306                  05/24/01   01/14/02    Panko Elec.                         
                                                            E-3            25,013                  05/24/01   01/14/02    Panko Elec.                         
                                                            E-4            20,516                  05/02/02   05/10/02    Panko Elec.                         
                                                            E-5             5,443                  02/04/02   04/01/02    Panko Elec.                         
                                                            GC-7            3,201                  09/11/01   01/08/02    George Nole & Son                   
                                                            H-2             4,260                  05/02/02   05/10/02    HJ Brandeles                        
                                                            H-3             6,434                  05/02/02   05/10/02    HJ Brandeles                        
                                                            H-4               387                  09/11/01   04/10/02    HJ Brandeles                        
                                                            P-1             9,068                  05/24/01   01/14/02    LaFrance Plumbing                   
                                                            P-3            -2,300                  05/02/02   05/10/02    LaFrance Plumbing                   
                                                            SITE-2          1,040                  05/24/01   01/14/02    Hanna Const.                        
                                                            SITE-3            700                  05/02/02   05/10/02    Hanna Const.                        
                                                            W1              5,525                  05/02/02   05/10/02    Utica Glass                         
                                                            W2              2,530                  05/02/02   05/10/02    Utica Glass                         
                                                            W3              1,250                  02/04/02   04/01/02    Utica Glass                         
 
94-1455   Reconstruction               0-002-006  05/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1297   Reconstruction               0-002-007  05/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -14,081                  04/24/03   05/07/03    Associated Const.                   
                                                            1                -716                  06/19/03   07/11/03    Roma Const.                         
                                                            2                -500                  04/24/03   05/07/03    Associated Const.                   
 
08-0573   Additions and Alterations    0-002-008  04/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1             -7,475                  02/08/10   04/30/10    ADVANCED POWER & LIGHT INC          
                                                            GC-01          10,355                  10/21/09   11/19/09    PONCELL CONSTRUCTION CO INC         
                                                            M-1             1,014                  02/08/10   04/30/10    SCHARF PLUMBING & HEATING           
                                                            P-1             1,896                  07/08/10   08/23/10    GIRUZZI PLUMBING & HEATING          
                                                            P-2             8,359                  07/19/10   10/29/10    giruzzi plumbing                    
                                                            R-1           -41,458                  10/21/09   11/19/09    PULVER ROOFING CO INC               
 
10-0301   Reconstruction               0-002-009  12/16/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1650   Reconstruction               0-002-010  04/19/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-001          3,426                  04/06/17   04/12/17    Ridley Electric                     
                                                            EC-002          3,145                  04/06/17   04/12/17    Ridley Electric                     
                                                            EC-003          4,482                  05/10/17   06/23/17    Ridley Electric                     
                                                            EC-004         10,707                  09/25/17   10/12/17    Ridley Electric                     
                                                            EC-005         10,341                  10/16/17   11/10/17    Ridley Electric                     
                                                            EC-006            615                  10/25/17   11/30/17    Ridley Electric                     
                                                            EC-007          2,196                  11/03/17   12/01/17    Ridley Electric                     
                                                            EC-008          1,077                  11/03/17   12/01/17    Ridley Electric                     
                                                            EC-009          2,582                  11/03/17   12/01/17    Ridley Electric                     
                                                            EC-010            637                  02/07/18   03/08/18    Ridley Electric                     
                                                            EC011          15,011                  06/11/18   06/29/18    RIDLEY ELECTRIC CO INC              
                                                            EC012          11,992                  06/15/18   07/06/18    RIDLEY ELECTRIC                     
                                                            EC013           9,645                  06/15/18   07/06/18    RIDLEY ELECTRIC                     
                                                            FS-001          5,928                  05/08/17   05/12/17    Main Ford General Supply            
                                                            GC-001          2,777                  04/06/17   05/15/17    J. Priore Construction Co., Inc.    
                                                            GC-002            437                  02/17/17   03/02/17    J. Priore Construction Co., Inc.    
                                                            GC-004         34,950                  02/13/17   07/17/17    J. Priore Construction Co., Inc.    
                                                            GC-005         10,200                  09/14/17   10/13/17    J. Priore Construction Co., Inc.    
                                                            GC-006            936                  10/25/17   11/13/17    J. Priore Construction Co., Inc.    
                                                            GC-007         18,256                  12/13/17   02/13/18    J. Priore Construction Co., Inc.    
                                                            GC-008          3,809                  05/14/18   06/01/18    J. Priore Construction Co., Inc.    
                                                            GC-009            417                  05/21/18   06/01/18    J. Priore Construction Co., Inc.    
                                                            GC-010         -5,975                  05/21/18   06/01/18    J. Priore Construction Co., Inc.    
                                                            GC-011          9,288                  05/29/18   06/25/18    J. PRIORE CONSTRUCTION              
                                                            GC008           3,809                  06/15/18   07/24/18    J PRIORE CONTRUCTION CO INC         
                                                            GC009             417                  06/15/18   07/24/18    J PRIORE CONSTRUCTION CO INC        
                                                            GC010          -5,975                  06/15/18   07/24/18    J PRIORE CONSTRUCTION CO INC        
                                                            GC011           9,288                  06/15/18   07/24/18    J PRIORE CONSTRUCTION CO INC        
                                                            GC012          -1,500                  06/15/18   07/24/18    J PRIORE CONSTRUCTION CO INC        
                                                            H-001           6,820                  05/22/17   06/07/17    Schmalz Mechanical COntractors, Inc.
                                                            H-002           2,499                  10/05/17   11/10/17    Schmalz Mechanical Contractors, Inc.
                                                            H-003           6,122                  11/20/17   12/05/17    Schmalz Mechanical Contractors, Inc.
                                                            H-004           1,763                  11/10/17   12/01/17    Schmalz Mechanical Contractors, Inc.
                                                            P-001           3,302                  04/17/17   04/21/17    H.J. Brandeles Corp.                
                                                            P-002             877                  11/03/17   12/01/17    H.J. Bradeles Corp.                 
                                                            P-003           3,675                  11/03/17   12/01/17    H.J. Brandeles Corp.                
                                                            P-004            -655                  11/03/17   12/01/17    H.J. Brandeles Corp.                
                                                            S-001          15,009                  12/02/16   02/06/17    C.W. Site Development, LLC          
                                                            S-002           6,502                  12/02/16   02/06/17    C.W. Site Development, LLC          
 
15-1767   Reconstruction               0-002-011  08/10/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0225   Reconstruction               0-002-012  11/08/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0400   Reconstruction               0-002-013  10/01/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0159   Reconstruction               0-002-014  10/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0381   Reconstruction               0-002-015  12/02/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1498   Reconstruction               0-002-016  02/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0702   Reconstruction               0-002-017  02/09/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,131                  10/26/22   12/19/23    Smith Site Devlp LLC                
                                                            2              33,493                  10/26/22   12/19/23    Smith Site Devlop LLC               
                                                            3              23,931                  10/26/22   12/19/23    Smith Site Devlp LLC                
                                                            4              10,975                  10/26/22   12/19/23    Smith Site Devlp LLC                
 
21-0383   Reconstruction               0-002-018  12/13/21  NO CHANGE ORDERS ON ELECTRONIC FILE
23-1035   Reconstruction               0-002-019  12/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0450FP Reconstruction               0-002-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Beekman Gym -UsedForAdmin-NoBldgAid:
98-1618   Reconstruction               0-005-002  10/05/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1              900                  05/02/02   05/10/02    Poncell Const.                      
                                                            GC-2           19,200                  01/10/02   03/15/02    Poncell Const.                      
                                                            GC-2           19,200                  03/05/02     /  /      Poncell Const.                      
                                                            P-1              -674                  05/02/02   05/10/02    Superior Plumbing                   
                                                            R-1            -2,000                  05/02/02   05/10/02    Henderson-Johnson                   
 
94-1456   Reconstruction               0-005-003  05/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1349   Reconstruction               0-005-004  06/08/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0574   Additions and Alterations    0-005-006  04/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1651   Reconstruction               0-005-007  04/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003          7,500                  02/17/17   03/02/17    J. Priore Construction Co., Inc.    
 
20-1499   Reconstruction               0-005-008  02/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXRelocatable purchFromBOCES-Removed:
95-0040   New Construction             0-007-001  08/02/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
94-1457EP Reconstruction               5-003-001  05/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1619   Reconstruction               5-003-002  10/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1298   Reconstruction               5-003-003  05/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
04-0003   Additions and Alterations    5-003-005  08/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          -2,958                  07/28/06   12/18/06    Usmail Electric                     
                                                            GC-001        -11,630                  11/28/05   08/08/06    Puterlo Construction                
 
20-1500   Reconstruction               5-003-006  02/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0384   Reconstruction               5-003-007  10/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0390   Reconstruction               5-003-008  11/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
20-0703   Reconstruction               7-004-001  02/09/21  NO CHANGE ORDERS ON ELECTRONIC FILE

SAUQUOIT VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-16-03-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Sulphur Springs Elementary:
94-0815   Additions and Alterations    0-002-006  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1287   Reconstruction               0-002-007  04/19/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            F-1            -3,012                  06/12/03   07/11/03    Hummels Office Plus                 
 
99-1569   Reconstruction               0-002-008  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0797   Reconstruction               0-002-009  05/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1              1,055                  12/11/02   12/13/02    Madonia Elec.                       
                                                            P1              3,750                  02/07/03   02/13/03    HJ Brandeles                        
 
05-0606   Reconstruction               0-002-010  05/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,300                  11/17/06   01/09/07    Smith Site Development              
                                                            002             6,020                  11/17/06   01/09/07    Smith Site Development              
                                                            002             6,590                  12/18/06   01/09/07    Ridley Electric                     
                                                            002            12,512                  01/29/07     /  /      Scharf Plumbing Heating             
                                                            003             3,546                  12/19/06   01/30/07    smith Site Development              
                                                            004            19,360                  12/18/06   01/30/07    Smith site Development              
                                                            004              -828                  03/26/07   04/02/07    HJ Brandeles Corp                   
                                                            005            11,027                  12/18/06   01/30/07    Smith Site Development              
                                                            005             5,922                  01/16/07   02/01/07    Ridley Electric                     
                                                            006             1,713                  01/29/07   02/22/07    Smith Site Development              
                                                            006             8,969                  07/30/07   08/20/07    HJ brandeles Corp                   
                                                            006             3,420                  02/25/08   04/02/08    cobblestone construction            
                                                            007            13,981                  03/02/07   03/13/07    Smith Site Development              
                                                            007             2,142                  05/11/07   05/16/07    Puterlo Construction                
                                                            007               698                  11/13/07   01/28/08    Scharf Plumbing & Heating           
                                                            008             1,759                  03/02/07   03/13/07    Ridley Electric                     
                                                            008            29,711                  05/23/07   06/21/07    Smith site Development              
                                                            009             1,380                  05/11/07   05/16/07    Puterlo Construction                
                                                            013               484                  07/14/08   10/21/08    HJ BRANDELES CORP.                  
                                                            014             7,946                  11/08/07   11/08/07    Smith Site Development              
                                                            015             2,066           2,066  11/13/07   01/08/08    Smith Site Development              
                                                            019             1,039                  11/13/07   01/28/08    Ridley Electric Co                  
                                                            020            -1,300           1,300  12/24/07     /  /      RIDLEY ELECTRIC CO. INC.            
                                                            025             8,525                  12/24/07   02/23/08    RIDLEY ELECTRIC CO. INC.            
                                                            026            23,118                  11/08/07   11/08/07    Putrelo Construction                
                                                            028               570                  02/25/08   04/15/08    ridley electric                     
                                                            029             1,970                  02/25/08   04/15/08    ridley electric                     
                                                            030            18,590                  07/14/08   10/21/08    RIDLEY ELECTRIC CO. INC.            
                                                            042           -28,000                  09/10/08   05/12/09    PUTRELO CONSTRUCTION CO.            
                                                            043             9,884                  09/10/08   05/12/09    PUTRELO CONSTRUCTION CO.            
                                                            17              1,278                  07/23/07   08/20/07    Puterlo Construction                
                                                            41               -616                  09/10/08   05/12/09    PUTERLO CONSTRUCTION CO.            
                                                            E-009           6,340                  03/26/07   04/25/07    Ridley electric                     
                                                            GC-001         42,266                  10/26/06   12/18/06    Puterlo Construction                
                                                            GC-005         57,750                  04/16/07     /  /      Puterlo Construction                
                                                            GC-020          1,234                  08/28/07   11/14/07    PUTRELO CONSTRUCTION CO.            
                                                            GC-029          2,835                  12/24/07   01/07/08    PUTRELO CONSTRUCTION CO.            
                                                            GC-033         25,000                  01/07/08   01/07/08    Putrelo Construction                
                                                            GC-038            672                  01/07/08   01/07/08    Putrelo Construction                
                                                            H - 02         28,163                  03/02/08   08/08/08    HJ BRANDELES CORP.                  
                                                            SITE 012        5,044                  08/28/07     /  /      SMITH SITE CONSTRUCTION             
                                                            SITE 013       17,062                  08/28/07     /  /      SMITH SITE CONSRTUCTION             
                                                            SITE011         9,407                  08/28/07     /  /      SMITH SITE DEVELOPMENT              
 
07-1798   Reconstruction               0-002-011  12/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-02              582                  12/14/09   01/21/10    RIDLEY ELECTRIC CO INC              
                                                            E-11              653                  07/06/10   08/19/10    RIDLEY ELECTRIC CO INC              
                                                            GC-02           9,666                  09/14/09   10/09/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-04           3,300                  09/21/09   11/06/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-05          21,683                  09/21/09   11/06/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-15           7,309                  08/23/10   09/23/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-16           2,157                  08/23/10   09/23/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-18          -2,157                  08/23/10   09/23/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
 
11-0141   Reconstruction               0-002-012  10/31/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-01             0                  07/11/12   08/06/13    H.J. BRANDELES CORP                 
                                                            HVAC-02             0                  08/30/12   07/23/13    H.J. BRANDELES CORP                 
 
15-1377   Reconstruction               0-002-014  03/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-02          -1,236                  07/17/17   09/07/17    Pulver Roofing                      
 
16-0085   Reconstruction               0-002-015  01/31/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002              0                  08/06/18   08/15/18    KNAPP ELECTRIC INC                  
                                                            GC-001          4,498                  11/06/17   11/17/17    Putrelo Building Enterprises        
                                                            GC-004         28,370                  11/06/17   11/17/17    Putrelo Building Enterprises        
                                                            GC-006          9,430                  12/11/17   01/31/18    Putrelo Building Enterprises        
                                                            GC-008          4,394                  03/19/18   03/20/18    Putrelo Building Enterprises        
                                                            GC-012          2,282                  05/03/18   08/06/18    Putrelo Building Enterprises        
                                                            SC 008         11,555                  11/30/18   01/11/19    Central Paving                      
                                                            SC-004          8,804                  02/23/18   02/28/18    Central Paving, Inc.                
                                                            SC-007          4,777                  08/27/18   01/11/19    CENTRAL PAVING INC                  
 
16-1098   Reconstruction               0-002-016  10/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-012          7,649                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-027         -1,325                  10/08/19   10/17/19    KNAPP ELECTRIC, INC.                
                                                            EC-03           1,239                  08/27/18   09/07/18    KNAPP ELECTRIC INC                  
                                                            EC-07           3,861                  12/27/18   02/06/19    KNAPP ELECTRIC INC                  
                                                            MC-008         11,300                  12/27/18   02/06/19    H.J. BRANDELES CORP                 
                                                            MC-013          3,606                  02/15/19   03/01/19    H.J. BRANDELES CORP.                
                                                            MC-015          8,040                  02/15/19   03/01/19    H.J. BRANDELES CORP.                
 
20-1643   Reconstruction               0-002-017  06/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0542   Reconstruction               0-002-018  01/11/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0354   Reconstruction               0-002-019  01/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0413   Reconstruction               0-002-020  10/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1886FP Reconstruction               0-002-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
94-0816   Additions and Alterations    0-003-005  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1288   Reconstruction               0-003-006  04/19/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            F-1            -3,483                  06/16/03   07/11/03    Hummels Office Plus                 
 
99-1568   Reconstruction               0-003-007  06/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-6            -4,821                  12/13/01   03/25/02    Richard Alexander                   
                                                            L-3             3,400                  01/08/03   11/21/03    Jemcoat, Inc                        
                                                            L-4R           -1,150                  01/13/03   02/05/03    Jemcoat, Inc                        
                                                            L2R1             -830                  01/08/03   11/21/03    Jemcoat, Inc                        
 
01-0798   Reconstruction               0-003-008  05/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            04             16,500                  01/08/04   01/16/04    MARS, Inc                           
                                                            B-1                 0                  12/12/02   12/19/02    MARS, Inc                           
                                                            B-2                 0                  11/25/03   12/01/03    MARS, Inc                           
                                                            B-3             5,932                  11/25/03   12/01/03    MARS, Inc                           
                                                            E-2               460                  02/21/03   03/04/03    Madonia Elec.                       
                                                            E-3             1,093                  07/17/03   07/25/03    Madonia Elec.                       
                                                            E-4               540                  01/08/04   04/05/04    Madonia Elec.                       
                                                            G-1                 0                  12/04/02   12/10/02    Lupini Const.                       
                                                            G-2                 0                  02/19/03   03/04/03    Lupini Const.                       
                                                            G-3            -8,350                  05/05/03   05/07/03    Lupini Const.                       
                                                            G-4                 0                  08/07/03   08/12/03    Lupini Const.                       
                                                            G-5            21,080                  11/25/03   12/05/03    Lupini Const.                       
                                                            G-6           -11,962                  11/25/03   12/01/03    Lupini Const.                       
 
05-0607   Reconstruction               0-003-009  05/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             9,462                  11/17/06   01/09/07    ridley Electric                     
                                                            002           -12,898                  10/23/06   12/18/06    Cobblestone Construction            
                                                            002            35,000                  01/17/07   02/09/07    HJ brandeles Corp                   
                                                            002            19,525                  03/26/07   04/02/07    Puterlo Construction                
                                                            003           -30,647                  12/18/06   01/09/07    Ridley Electric                     
                                                            003             3,640                  02/20/07   03/08/07    Scharf Plumbing                     
                                                            003            -8,250                  03/02/07   03/13/07    HJ Brandeles Corp                   
                                                            003            16,982                  03/26/07   04/02/07    Puterlo Construction                
                                                            003                40                  05/11/07   05/16/07    Cobblestone Construction            
                                                            004           -11,500                  12/18/06   01/09/07    Ridley Electric                     
                                                            004             4,173                  03/26/07   04/25/07    Scharf Plumbing                     
                                                            004            16,329                  06/15/07   06/20/07    Cobblestone Construction            
                                                            005           -16,000                  05/29/07   06/20/07    HJ Brandeles Corp                   
                                                            005               400                  11/08/07   01/28/08    Scharf Plumbing & Heating           
                                                            006            23,099                  04/16/07   05/15/07    Puterlo Construction                
                                                            008            20,747                  05/11/07   05/16/07    Puterlo  Construction               
                                                            008            11,453                  11/13/07   01/28/08    HJ Brandeles Corp                   
                                                            008               400                  11/13/07   01/28/08    Scharf Plumbing & Heating           
                                                            009             1,068                  11/13/07   01/28/08    Scharf Plumbing & Heating           
                                                            010               313                  03/26/07   04/25/07    Ridley Electric                     
                                                            010            22,520                  05/23/07   06/21/07    Puterlo Construction                
                                                            011            -3,569                  04/16/07   05/25/07    Ridley Electric                     
                                                            012            38,000                  04/16/07   05/25/07    Ridley Electric                     
                                                            014             2,300                  07/09/07   10/28/07    Ridley Electric                     
                                                            014               598                  07/14/08   10/21/08    HJ BRANDELES CORP.                  
                                                            015            56,800                  07/09/07   07/17/07    Puterlo Construction                
                                                            016            91,211                  07/09/07   07/17/07    Puterlo Construction                
                                                            016             5,974                  12/26/08   06/25/09    HJ BRANDELES CORP.                  
                                                            017             1,000                  11/08/07   01/28/08    Ridley Electric Company             
                                                            018             2,771                  11/13/07   01/28/08    Ridley Electric                     
                                                            024            28,989                  12/24/07   02/23/08    RIDLEY ELECTRIC CO. INC.            
                                                            027             5,765                  02/08/08   02/23/08    Ridley Electic                      
                                                            028            23,870                  11/13/07   12/27/07    Putrelo Construction                
                                                            032             3,200                  07/14/08   10/21/08    RIDLEY ELECTRIC CO. INC.            
                                                            E-021           1,713                  01/07/08   02/23/08    Ridley Electric                     
                                                            E-022           8,022                  01/07/08   02/23/08    Ridley Electric                     
                                                            E-023          10,799                  01/07/08   02/23/08    Ridley Electric                     
                                                            ELE-15          6,581                  08/28/07   11/14/07    RIDLEY ELECTRIC CO., INC.           
                                                            GC - 018        5,856                  09/04/07   11/07/07    PUTRELO CONSTRUCTION CO.            
                                                            GC - 022       18,200                  08/28/07     /  /      PUTRELO CONSTRUCTION CO.            
                                                            GC - 023       19,133                  08/28/07     /  /      PUTRELO CONSTRUCTION CO.            
                                                            GC - 025       84,172                  08/28/07   11/15/07    PUTERLO CONSTRUCTION CO.            
                                                            GC-011         19,198                  06/15/07   06/20/07    Puterlo Construction                
                                                            GC-013         51,593                  06/01/07   06/20/07    Puterlo Construction                
                                                            GC-019          9,389                  09/04/07   11/08/07    PUTRELO CONSTRUCTION CO.            
                                                            GC-030          2,940                  01/07/08   01/07/08    Putrelo Construction                
                                                            GC-034          5,229                  01/07/08   01/07/08    Putrelo Construction                
                                                            GC-035         14,047                  01/07/08   01/07/08    Putrelo Construction                
                                                            GC-036         -1,966                  01/07/08   01/07/08    Putrelo Construction                
                                                            GC-039         34,104                  02/25/08   04/02/08    putrelo construction                
                                                            GC-040         33,474                  02/25/08   04/02/08    putrelo construction                
                                                            GC-044          5,023                  09/10/08   10/30/08    PUTRELO CONSTRUCTION CORP.          
                                                            GC-045          2,380                  09/10/08   10/30/08    PUTRELO CONSTRUCTION CORP           
                                                            GC-21          13,276                  08/28/07   11/14/07    PUTERLO CONSTRUCTIOM CO.            
                                                            GC-31          19,950                  12/24/07   01/07/08    PUTRELO CONSTRUCTION CO.            
                                                            H-009           1,177                  01/07/08   02/23/08    HJ Bradeles Corp                    
                                                            H-010           4,273                  01/07/08   02/23/08    HJ Brandeles Corp                   
                                                            H-017          24,465                  08/07/09   09/16/09    HJ RANDELES CORP.                   
                                                            HAVAC007       10,423                  08/28/07   11/14/07    HJ BRANDELES CORP.                  
                                                            HVAC-015        7,911                  10/16/08   04/13/09    HJ BRANDELES CORP.                  
                                                            P-011           1,719                  01/07/08   02/23/08    Scharf Plumbing & Heating           
                                                            P-012           7,469                  01/07/08   02/23/08    Scharf Plumbing & Heating           
 
07-1799   Reconstruction               0-003-010  12/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          15,844                  12/14/09   01/21/10    RIDLEY ELECTRIC CO INC              
                                                            E-03            7,729                  04/14/10   05/24/10    RIDLEY ELECTRIC CO INC              
                                                            E-04           20,833                  04/14/10   05/24/10    RIDLEY ELECTRIC CO INC              
                                                            E-05            2,548                  04/14/10   05/24/10    RIDLEY ELECTRIC CO INC              
                                                            E-06           25,678                  04/23/10   07/28/10    RIDLEY ELECTRIC CO INC              
                                                            E-07           22,249                  04/23/10   07/28/10    RIDLEY ELECTRIC CO INC              
                                                            E-08           11,118                  06/14/10   11/18/10    RIDLEY ELECTRIC CO INC              
                                                            E-09            1,422                  06/14/10   11/18/10    RIDLEY ELECTRIC CO INC              
                                                            E-10            1,997                  06/14/10   11/18/10    RIDLEY ELECTRIC CO INC              
                                                            E-12           24,148                  08/23/10   09/23/10    RIDLEY ELECTRIC CO NC               
                                                            E-13           -3,850                  04/23/12   09/12/12    RIDLEY ELECTRIC CO INC              
                                                            E-14             -653                  09/19/12   07/03/13    RIDLEY ELECTRIC CO INC              
                                                            GC-01               0                  04/24/09   07/21/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-06           8,075                  10/05/09   10/29/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-07          13,740                  02/08/10   04/30/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-09          10,275                  02/05/10   06/14/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-11           4,184                  02/05/10   06/14/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-12           4,936                  04/23/10   07/28/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-13           8,701                  04/23/10   08/03/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-17           2,946                  07/06/10   08/19/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
 
11-0142   Reconstruction               0-003-011  10/31/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01                0                  08/30/12   07/23/13    AMP ELECTRIC                        
                                                            E-02                0                  09/19/12   08/12/13    AMP ELECTRIC                        
                                                            E-03            3,160                  09/19/12   08/12/13    AMP ELECTRIC                        
                                                            E-05            1,458                  10/05/12   07/23/13    AMP ELECTRIC                        
                                                            E-06            5,303                  10/05/12   08/12/13    AMP ELECTRIC                        
                                                            E-07              414                  01/28/13   07/23/13    AMP ELECTRIC                        
                                                            HVAC-03        -2,184                  10/05/12   07/23/13    H.J. BRANDELES CORP                 
 
13-1609   Reconstruction               0-003-012  07/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         21,859                  12/24/15   01/12/16    MURNANE BUILDING CONTRACTORS        
                                                            GC-002         27,076                  12/24/15   01/12/16    MURNANE BUILDING CONTRACTORS        
                                                            GC-003         18,702                  12/24/15   01/12/16    MURNANE BUILDING CONTRACTORS        
 
15-1378   Reconstruction               0-003-014  03/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01           3,637                  07/17/17   09/07/17    Pulver Roofing                      
 
16-1099   Reconstruction               0-003-015  10/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-0024         1,723                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-01           1,681                  08/27/18   09/12/18    KNAPP ELECTRIC INC                  
                                                            EC-010          7,526                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-011          7,934                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-013         14,123                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-014         17,021                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-015          7,603                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-016          3,595                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-017          2,562                  07/01/19   07/05/19    KNAPP ELECTRIC, INC.                
                                                            EC-018           -955                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-019         -5,514                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-020         -5,808                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-021          3,890                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-022          3,982                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-023         35,045                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-026            251                  10/08/19   10/18/19    KNAPP ELECTRIC, INC.                
                                                            EC-028          2,423                  10/23/19   10/25/19    KNAPP ELECTRIC, INC.                
                                                            EC-029          4,640                  10/23/19   10/25/19    KNAPP ELECTRIC, INC.                
                                                            EC-030          3,853                  11/18/19   11/22/19    KNAPP ELECTRIC, INC.                
                                                            EC-033          2,512                  01/13/20   02/04/20    KNAPP ELECTRIC, INC.                
                                                            EC-06           1,454                  12/27/18   02/06/19    KNAPP ELEC INC                      
                                                            EC-31           3,244                  01/13/20   02/03/20    KNAPP ELECTRIC, INC.                
                                                            EC-32           3,017                  01/13/20   02/03/20    KNAPP ELECTRIC, INC.                
                                                            EC08           11,458                  03/06/19   03/08/19    KNAPP ELECTRIC, INC.                
                                                            GC-003          4,766                  10/03/18   10/29/18    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-004         31,120                  10/16/18   11/15/18    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-005         25,562                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-006         22,438                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-007         18,666                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-009         10,393                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-010          8,654                  12/27/18   02/25/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-011         14,276                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-012         11,080                  01/27/20   02/21/20    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-013         16,260                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-014         17,341                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-016         14,791                  01/02/19   02/12/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-019         -2,092                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-020          9,577                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-021         11,123                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-022          5,063                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-023          6,375                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-024          6,231                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-025          4,919                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-026          2,585                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-028         12,560                  06/03/19   06/07/19    BETTE & CRING CONSTRUCTION CORP.    
                                                            GC-029          3,446                  06/03/19   06/07/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-030         52,583                  06/03/19   06/07/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-031         23,517                  06/03/19   06/07/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-032         20,720                  06/03/19   06/07/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-033         64,398                  06/03/19   06/07/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-034         -2,068                  07/01/19   07/05/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-035          7,474                  10/08/19   10/21/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-036          2,489                  10/08/19   10/21/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-038           -373                  10/08/19   10/21/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-039          3,803                  09/16/20   11/13/20    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-040         10,247                  09/25/19   10/07/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-041        -14,303                  10/23/19   10/28/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-042          7,245                  11/18/19   11/29/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC017          12,096                  03/06/19   03/08/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC018           3,063                  03/06/19   03/08/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            MC-001          3,922                  07/20/18   12/28/18    H.J BRANDELES CORP                  
                                                            MC-002          3,077                  09/04/18   09/11/18    H.J. BRANDELES CORP                 
                                                            MC-006          6,016                  10/01/18   10/15/18    H.J.BRANDELES CORP.                 
                                                            MC-007          5,778                  10/03/18   10/26/18    H.J BRANDELES CORP                  
                                                            MC-009          1,082                  12/27/18   02/06/19    H.J. BRANDELES CORP                 
                                                            MC-014         19,839                  02/15/19   03/01/19    H.J. BRANDELES CORP.                
                                                            MC-018           -813                  11/08/19   11/12/19    H.J. BRANDELES CORP.                
                                                            MC003           2,268                  09/04/18   09/11/18    H.J. BRANDELES CORP                 
                                                            MC004          12,780                  09/04/18   09/11/18    H.J. BRANDELES CORP                 
                                                            PC-001          4,847                  07/20/18   12/28/18    H.J. BRANDELES CORP                 
                                                            PC-004          3,189                  04/24/19   04/25/19    H.J. BRANDELES CORP.                
                                                            PC-006         -8,708                  09/25/19   10/01/19    H.J. BRANDELES CORP.                
                                                            PC003          -4,200                  03/06/19   03/08/19    H.J. BRANDELES CORPORATION          
 
16-0086   Reconstruction               0-003-016  01/31/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            009             1,619                  11/30/18     /  /      Central Paving                      
                                                            EC-001          2,877                  02/23/18   05/16/18    Knapp Electric, Inc.                
                                                            EC-004           -996                  08/06/18   08/15/18    KNAPP ELECTRIC INC                  
                                                            GC-002          5,472                  12/26/17   01/26/18    Putrelo Building Enterprises        
                                                            GC-003         16,458                  11/06/17   11/17/17    Putrelo Building Enterprises        
                                                            GC-005          9,311                  11/06/17   11/17/17    Putrelo Building Enterprises        
                                                            GC-007          5,877                  12/11/17   01/31/18    Putrelo Building Enterprises        
                                                            GC-010         -2,521                  03/19/18   03/20/18    Putrelo Building Enterprises        
                                                            GC-013          2,136                  05/03/18   08/06/18    Putrelo Building Enterprises        
                                                            GC-014          1,959                  05/03/18   08/06/18    Putrelo Building Enterprises        
                                                            MC-001         -1,458                  01/29/18   04/12/18    H.J. Brandeles Corp.                
                                                            PC001          -1,800                  06/25/18   07/26/18    J.J. BRANDELES CORP                 
                                                            SC-003            395                  03/08/18   03/20/18    Central Paving, Inc.                
                                                            SC-005         18,767                  02/23/18   02/28/18    Central Paving, Inc.                
                                                            SC-009          5,835                  01/24/19   03/12/19    CENTRAL PAVING, INC.                
 
21-0543   Reconstruction               0-003-017  01/11/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-2051   Reconstruction               0-003-018  07/25/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0355   Reconstruction               0-003-019  01/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1880FP Reconstruction               0-003-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Chadwicks Elementary:
94-0817   Reconstruction               0-006-001  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
99-1286   Reconstruction               0-007-002  04/19/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            F-1            -2,918                  06/16/03   07/11/03    Hummels Office Plus                 
 
99-1744   Reconstruction               0-007-003  09/01/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2R            1,663                  12/10/01   02/28/02    Madonia Elec.                       
                                                            G-3             2,480                  12/06/01   01/13/03    Richard Alexander                   
                                                            G-3R            2,480                  01/31/02   02/21/02    Richard Alexander                   
                                                            G-5            -1,292                  12/07/01   02/21/02    Richard Alexander                   
                                                            L-2               655                  11/06/01   02/13/03    Jemcoat                             
                                                            L-2R2           1,484                  01/08/03   11/21/03    Jemcoat                             
                                                            P-3R            2,783                  12/07/01   02/21/02    HJ Brandeles                        
                                                            P-5            -5,850                  02/11/02   03/25/02    HJ Brandeles                        
 
01-0799   Reconstruction               0-007-004  05/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0608   Reconstruction               0-007-005  05/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -60,295                  09/11/06   11/29/06    Cobblestone Construction            
                                                            001              -407                  01/16/07   02/01/07    Scharf Plumbing Heating             
                                                            004            15,015                  04/16/07   05/15/07    Puterlo Construction                
                                                            007              -918                  02/20/07   03/08/07    Ridley Electric                     
                                                            013             8,821                  06/15/07   10/22/07    Ridley Electric                     
                                                            014            27,000                  06/28/07   07/17/07    Puterlo Construction                
                                                            E-026           2,916                  01/07/08   02/23/08    Ridley Electric                     
                                                            GC-024            850                  08/28/07   11/14/07    PUTRELO CONSTRUCTION CO.            
                                                            GC-032          1,493                  01/07/08   01/07/08    Putrelo Construction                
                                                            HVAC-001      -30,000                  12/18/06     /  /      HJ Brandeles Corp                   
                                                            R-005           1,645                  01/07/08   01/07/08    Cobblestone Construction            
                                                            SITE010         8,933                  08/28/07   11/14/07    SMITH SITE DEVELOPMENT              
 
07-1800   Reconstruction               0-007-006  12/08/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-03           8,154                  09/21/09   11/06/09    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-08           2,947                  02/08/10   04/30/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-10          13,548                  02/09/10   06/14/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-14           1,171                  04/23/10   07/28/10    BELLOWS CONSTRUCTION SPECIALTIES LLC
 
11-0143   Reconstruction               0-007-007  10/31/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-04            1,296                  10/05/12   07/23/13    AMP ELECTRIC                        
 
16-0087   Reconstruction               0-007-009  01/31/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003              0                  08/06/18   08/15/18    KNAPP ELECTRIC INC                  
                                                            GC-009          4,775                  03/19/18   03/20/18    Putrelo Building Enterprises        
                                                            SC-001          8,632                  01/29/18   02/21/18    Central Paving, Inc.                
                                                            SC-002          5,113                  01/29/18   02/21/18    Central Paving, Inc.                
                                                            SC-006          4,009                  08/27/18   01/11/19    CENTRAL PAVING INC                  
 
16-1100   Reconstruction               0-007-010  10/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          20,068                  08/27/18   09/07/18    KNAPP ELECTRIC INC                  
                                                            EC-025          5,691                  10/08/19   10/17/19    KNAPP ELECTRIC, INC.                
                                                            EC009           6,617                  03/06/19   03/08/19    KNAPP ELECTRIC, INC.                
                                                            MC-005         11,240                  09/12/18   09/27/18    H.J. BRANDELESS CORP.               
                                                            MC-010          3,556                  12/27/18   02/06/19    H.J. BRANDELES CORP                 
                                                            MC-012          4,354                  12/27/18   02/06/19    H.J BRANDELES CORP                  
                                                            MC-017          4,968                  04/11/19   04/12/19    H.J. BRANDELES CORP.                
                                                            MC016          11,162                  03/06/19   03/08/19    H.J. BRANDELES CORPORATION          
                                                            PC-005         -2,479                  10/08/19   10/18/19    H.J. BRANDELES CORP.                
                                                            PC-007          7,807                  11/18/19   11/22/19    H.J. BRANDELES CORP.                
 
21-0544   Reconstruction               0-007-011  01/11/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01        -169,054                  07/14/23   12/22/23    MONAHAN & LOUGHLIN                  
                                                            RC-01        -169,054                  07/31/23     /  /      MONAHAN & LOUGHLIN                  
 
22-0356   Reconstruction               0-007-012  01/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Recreation Storage Bldg.:
94-0818   Additions and Alterations    2-008-002  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
94-0819   Reconstruction               5-001-003  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1285   Reconstruction               5-001-004  04/19/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            -6,509                  06/26/07   06/27/07    DC Electric Co                      
 
99-1567   Reconstruction               5-001-005  06/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0609   Reconstruction               5-001-006  05/30/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006             2,750                  03/02/07   03/13/07    Ridley Electric                     
                                                            006            23,537                  11/13/07   01/28/08    Scharf Plumbing & Heating           
                                                            010             4,828                  01/28/08   03/19/08    SCHARF PLUMBING AND HEATING         
                                                            027             1,866                  11/13/07   12/27/07    Putrelo Construction Co.            
                                                            031               996                  07/14/08   10/21/08    RIDLEY ELECTRIC CO. INC.            
                                                            ELE-16          4,821                  08/28/07   11/14/07    RIDLEY ELECTRIC., INC.              
                                                            GC-037         -4,581                  01/07/08   01/07/08    Putrelo Construction                
                                                            GC012           3,450                  06/15/07   06/20/07    Puterlo Construction                
                                                            H-011             442                  12/24/07   02/23/08    HJ BRANDELES CORP                   
 
16-1101   Reconstruction               5-001-009  10/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04          20,785                  12/27/18   02/06/19    KNAPP ELECTRIC INC                  
                                                            EC-05          23,754                  12/27/18   02/06/19    KNAPP ELEC INC                      
                                                            GC-002         15,694                  07/20/18   09/14/18    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-008          6,606                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-01           5,093                  07/20/18   09/14/18    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-015          7,546                  12/27/18   02/13/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-027         -1,505                  04/11/19   04/15/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            GC-037          1,219                  10/08/19   10/21/19    BETTE & CRING CONSTRUCTION GROUP    
                                                            MC-011            329                  12/27/18   02/06/19    H.J. BRANDELES CORP                 
                                                            PC-002         57,857                  10/16/18   11/29/18    H.J. BRANDELES CORP                 
 
21-0545   Reconstruction               5-001-010  01/11/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0357   Reconstruction               5-001-011  01/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
99-0799   Reconstruction               7-999-001  04/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1652   Reconstruction               7-999-002  06/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE

REMSEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-17-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Junior Senior High School:
91-0075   Reconstruction               0-001-003  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0941   Reconstruction               0-001-004  04/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0679   Additions and Alterations    0-001-006  03/11/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0088   Reconstruction               0-001-007  08/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0807   Reconstruction               0-001-008  03/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SW-1           -4,834                  10/17/02     /  /      Delaney Construction                
                                                            SW-2              705                  10/17/02   12/02/02    Delaney Construction                
                                                            W-1           -13,000                  10/17/02   12/02/02    Utica Glass                         
 
00-1368   Reconstruction               0-001-009  10/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ASB-1          -5,000                  10/17/02   10/28/02    Midatlantic Environ.                
                                                            E-2              -469                  10/17/02   10/28/02    Bagnall Elec.                       
                                                            GC-2          -23,487                  10/17/02   10/24/02    Park City Builders                  
                                                            HVAC-1         -6,895                  10/17/02   10/28/02    HJ Brandeles                        
                                                            P-4            17,381                  10/17/02   10/28/02    Superior Plumbing                   
                                                            SW-3           82,268                  06/09/06   07/26/06    Delaney Construction                
 
06-1305   Reconstruction               0-001-010  05/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-02            8,080                  06/20/08   09/29/08    Rochester Flooring Resource         
                                                            1-03           16,012                  04/03/09   06/10/09    ROCHESTER FLOORING RESOURCE         
 
07-2295   Reconstruction               0-001-011  08/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -22,790                  01/30/09   02/26/09    WCA ROOFING & SHEET METAL CO.       
                                                            1-02            2,250                  07/01/11   07/27/11    WCA ROOFING & SHEET METAL CO        
 
08-1541   Reconstruction               0-001-012  08/12/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0745   Reconstruction               0-001-013  05/24/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0056   Reconstruction               0-001-014  07/28/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  06/13/16   07/27/16    MURPHY EXCAVATING                   
                                                            GC-02             292                  06/13/16   07/27/16    MURPHY EXCAVATING                   
                                                            GC-02             292                  06/24/16     /  /      Murphy Excavating, Corp.            
 
16-0094   Reconstruction               0-001-015  01/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  04/24/17   06/05/17    National Building & Restoration     
                                                            GC-02           5,532                  06/29/17   07/05/17    National Building & Restoration     
                                                            GC-03             815                  06/29/17   07/05/17    National Building & Restoration     
                                                            GC-04           2,607                  06/29/17   07/05/17    National Building & Restoration     
                                                            GC-05           1,545                  06/29/17   07/05/17    National Building & Restoration     
                                                            GC-06             871                  06/29/17   07/05/17    National Building & Restoration     
                                                            GC-07             369                  06/29/17   07/05/17    National Building & Restoration     
 
16-1284   Reconstruction               0-001-016  10/03/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0240   Reconstruction               0-001-017  05/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  02/13/19   03/01/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-02               0                  12/14/18   01/14/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-03               0                  12/14/18   01/14/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-04               0                  02/13/19   03/01/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-05               0                  06/25/19   06/27/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-06               0                  06/25/19   06/27/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-07               0                  06/25/19   06/27/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-08               0                  06/25/19   06/27/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-09               0                  06/25/19   06/27/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-10               0                  06/25/19   06/27/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-11               0                  06/25/19   06/27/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-12               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-13               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-14               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-15               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-16               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-17               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-19               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-22               0                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-24             802                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-28           6,067                  01/02/20   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-29             995                  01/02/20   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-32          10,854                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-33           3,932                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-35           1,063                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-36             511                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-37             695                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-38          10,543                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            GC-01               0                  12/14/18   01/14/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-02               0                  12/14/18   01/14/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-03               0                  12/14/18   01/14/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-05               0                  02/13/19   03/01/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-06               0                  02/13/19   03/01/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-07               0                  02/13/19   03/01/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-08               0                  02/13/19   03/01/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-09               0                  02/13/19   03/01/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-10               0                  02/13/19   03/01/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-11               0                  02/13/19   03/01/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-12               0                  02/13/19   02/28/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-13               0                  02/13/19   02/28/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-15               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-16               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-17               0                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-18               0                  07/10/19   07/15/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-19               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-20               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-21               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-22               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-23            -222                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-25          -1,878                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-26               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-27           5,255                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-28          -1,759                  07/22/19   07/24/19    Nation Building & Restoration Corp  
                                                            GC-29             296                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-31          -1,236                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-32           6,139                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-33           4,952                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-34           1,702                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-36            -414                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-37           2,116                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-38           3,951                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-39           1,108                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-40             531                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-41             686                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-42           2,366                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-43           7,382                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-45           3,411                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-46           5,714                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-47             583                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-48           5,000                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-49           2,163                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-50           2,115                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-52          -3,500                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-53           3,523                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-55           3,511                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-57           3,465                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-58           6,930                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-59             539                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-62           1,779                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-64            -100                  12/30/19   01/31/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-65          -1,356                  12/30/19   02/03/20    NATIONAL BUILDING & RESTORATION CORP
                                                            MC-01               0                  06/25/19   06/27/19    SCHMALZ MECHANICAL CONTRACTORS, INC 
                                                            MC-02               0                  06/25/19   06/27/19    SCHMALZ MECHANICAL CONTRACTORS, INC 
                                                            MC-03               0                  06/25/19   06/27/19    SCHMALZ MECHANICAL CONTRACTORS, INC 
                                                            MC-04               0                  06/25/19   06/27/19    SCHMALZ MECHANICAL CONTRACTORS, INC 
                                                            MC-05               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-06               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-08               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-09               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            PC-01               0                  10/24/18   11/09/18    H.J. BRANDELES CORP                 
                                                            PC-02               0                  01/22/19   02/13/19    H.J. BRANDELES, CORP.               
                                                            PC-03               0                  01/22/19   02/13/19    H.J. BRANDELES, CORP.               
                                                            PC-04             642                  06/25/19   06/27/19    H.J. BRANDELES, CORP.               
                                                            PC-05           8,878                  06/25/19   06/27/19    H.J. BRANDELES, CORP.               
                                                            PC-06           9,925                  06/25/19   06/27/19    H.J. BRANDELES, CORP.               
                                                            PC-07            -987                  06/25/19   06/27/19    H.J. BRANDELES,CORP.                
                                                            PC-08             477                  06/25/19   06/27/19    H.J. BRANDLES, CORP.                
                                                            PC-09           2,813                  12/27/19   01/14/20    H.J. BRANDELES, CORP.               
                                                            PC-12             840                  12/27/19   01/14/20    H.J. BRANDELES, CORP.               
                                                            RC-01         -35,565                  12/27/19   01/22/20    PTL CONTRACTING, CORP.              
                                                            RC-05               0                  12/27/19   01/22/20    PTL CONTRACTING, CORP.              
                                                            RC-06         -45,682                  12/27/19   01/22/20    PTL CONTRACTING, CORP.              
 
17-0504   Reconstruction               0-001-018  11/27/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          11,149                  05/16/18   05/31/18    BELLOWS CONSTRUCTION SPECIALTIES,LLC
                                                            GC-01A            313                  06/21/18   07/24/18    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-02           5,790                  06/21/18   07/24/18    BELLOWS CONSTRUCTION SPECIALTIES LLC
                                                            GC-03          11,600                  09/13/18     /  /      BELLOWS CONSTRUCTION SPECIALTIES LLC
 
19-0347   Reconstruction               0-001-019  01/30/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  06/18/20   07/24/20    J.PRIORE CONSTRUCTION CO.,INC.      
                                                            GC-02               0                  06/18/20   07/24/20    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-04               0                  06/23/20   07/24/20    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-05          -1,930                  07/02/20   08/12/20    J.PRIORE CONSTRUCTION CO.,INC.      
 
20-0118   Reconstruction               0-001-020  09/02/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  05/09/22   05/22/23    Richard Alexander Co Inc            
                                                            GC-02          -3,841                  06/16/22   04/03/23    Richard Aleander Co Inc             
 
20-0655   Reconstruction               0-001-021  01/13/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FC-01               0                  10/28/21   12/08/22    Beavers Pertrol Equip. Co. Inc      
                                                            FC-02               0                  10/28/21   12/08/22    Beavers petroleum Equip. Co. Inc    
                                                            FC-03               0                  10/28/21   12/08/22    Beavers Petroleum Equip Co, Inc     
                                                            FC-04          12,688                  10/28/21   12/08/22    Beavers Petroleum Equip. Co. Inc    
                                                            FC-05           9,600                  10/28/21   12/08/22    Beavers Petroleum Equip. Co, Inc    
                                                            FC-06          -2,955                  10/28/21   12/08/22    Beavers Petroleum Equip, Co, Inc    
                                                            GC-01          -5,000                  12/23/22   12/12/23    Richard Alexander Co Inc            
 
02-0614FP Reconstruction               0-001-FP1  12/04/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0267SC Visual Structural Inspection 0-001-SC1  10/05/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Remsen Elementary School:
91-0076   Reconstruction               0-006-003  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1367   Reconstruction               0-006-004  10/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-3            7,541                  12/06/02   01/10/03    Park City Builders                  
                                                            HVAC-3            725                  10/17/02   10/28/02    HJ Brandeles                        
                                                            P-3B           -1,405                  12/06/02   01/10/03    Superior Plumbing                   
                                                            P-5B            9,778                  12/06/02   01/10/03    Superior Plumbing                   
 
06-1306   Reconstruction               0-006-005  05/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            6,270                  06/19/08   09/29/08    Rochester Flooring Resource         
 
08-1542   Reconstruction               0-006-007  08/12/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1474   Reconstruction               0-006-008  09/13/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -5,000                  05/24/11   07/15/11    HJ BRANDELES CORP                   
 
16-1285   Reconstruction               0-006-009  10/03/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0241   Reconstruction               0-006-010  05/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-18               0                  12/05/19   12/13/19    S.C. SPEMCER ELECTRIC, INC.         
                                                            EC-21               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-23               0                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-25           4,007                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-26           6,156                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-27           2,158                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-30           2,774                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-34           1,986                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-39          -2,977                  12/30/19   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            GC-35           4,218                  07/16/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-51           1,786                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-54           5,856                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-56             478                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-60             -75                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-61          -1,500                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-63           1,574                  12/30/19   01/22/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-66            -824                  12/30/19   01/31/20    NATIONAL BUILDING & RESTORATION CORP
                                                            MC-07               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-10               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-11               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-12               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-13               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-14               0                  12/27/19   01/14/20    SCHMALZ MECHANICAL CONTRACTORS, INC.
                                                            MC-15         -35,257                  12/30/19   01/10/20    SCHMALZ MECHANICAL CONTRACTORS,INC. 
                                                            PC-10           2,765                  12/27/19   01/14/20    H.J. BRANDELES, CORP.               
                                                            PC-11           1,025                  12/27/19   01/14/20    H.J. BRANDELES, CORP.               
                                                            RC-02         -14,490                  01/17/20   03/05/20    PTL CONTRACTING CORP.               
                                                            RC-03               0                  12/27/19   01/22/20    PTL CONTRACTING, CORP.              
                                                            RC-04               0                  12/27/19   01/22/20    PTL CONTRACTING, CORP.              
 
18-0788   Reconstruction               0-006-011  12/21/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  07/15/19   07/17/19    KUEHNE CONSTRUCTION                 
 
20-0656   Reconstruction               0-006-012  01/13/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0201   Reconstruction               0-006-013  10/13/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  05/01/23   12/28/23    RICHARD E. ALEXANDER                
                                                            GC-01               0                  06/22/23   12/22/23    RICHARD E. ALEXANDER                
                                                            GC-02          -5,000                  07/10/23     /  /      RICHARD E. ALEXANDER                
 
02-0613FP Reconstruction               0-006-FP1  12/04/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
17-0242   Reconstruction               5-002-002  05/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-20               0                  12/05/19   12/13/19    S.C. SPENCER ELECTRIC, INC.         
                                                            EC-31             488                  01/02/20   01/21/20    S.C. SPENCER ELECTRIC, INC.         
                                                            GC-04               0                  12/14/18   01/14/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-14               0                  02/13/19   02/28/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-24               0                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-30            -135                  07/03/19   07/19/19    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-44           1,455                  12/30/19   01/27/20    NATIONAL BUILDING & RESTORATION CORP
                                                            GC-67            -257                  01/17/20   02/13/20    NATIONAL BUILDING & RESTORATION     
 

          New Bus Garage:
00-1366   New Construction             5-007-001  10/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            -6,776                  10/17/02   10/28/02    Bagnall Elec.                       
                                                            GC-1          -21,550                  10/17/02   10/28/02    Park City Builders                  
                                                            HVAC-2            380                  10/17/02   10/28/02    HJ Brandeles                        
                                                            P-1               700                  10/17/02   10/28/02    Superior Plumbing                   
                                                            P-2            -3,500                  10/17/02   10/28/02    Superior Plumbing                   
                                                            P-3A           -1,405                  12/06/02   01/10/03    Superior Plumbing                   
                                                            P-5A            9,778                  12/06/02   01/10/03    Superior Plumbing                   
                                                            SW-4           74,964                  06/06/06   07/26/06    Delaney Construction                
 
07-1823   Reconstruction               5-007-002  03/18/08  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1286   Reconstruction               5-007-003  10/03/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
18-1408   Reconstruction               7-999-001  04/15/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             944                  03/10/20   06/29/20    S.C. SPENCER ELECTRIC, INC.         
 
23-0040   Reconstruction               7-999-002  08/29/23  NO CHANGE ORDERS ON ELECTRONIC FILE

ROME CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-18-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Francis Bellamy School:
93-0251   Additions and Alterations    0-001-003  12/13/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0911   Reconstruction               0-001-004  06/03/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            1,632                  11/21/02   12/13/02    Trataros Const.                     
                                                            GC-2                0                  11/21/02   12/13/02    Trataros Const.                     
                                                            GC-3                0                  11/21/02   12/13/02    Trataros Const.                     
                                                            GC-5          -30,591                  11/21/02   12/13/02    Trataros Const.                     
 
01-1002   Reconstruction               0-001-006  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1300   Additions and Alterations    0-001-007  03/25/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-1            18,576                  01/15/10   02/26/10    ULSTER PAVING COMPANY               
                                                            C-2             2,601                  10/06/10   10/21/10    ULSTER PAVING COMPANY               
                                                            C-3            14,370                  12/08/10   01/13/11    ULSTER PAVING COMPANY               
                                                            E-01          -25,336                  03/24/11   05/11/11    ONEIDA ELECTRICAL CONTRACTORS       
                                                            E-02           14,982                  06/26/12     /  /      Oneida Electrical Contractors       
                                                            FSE-1          -6,472                  07/09/10   08/24/10    SARATOGA RESTAURANT EQUIPMENT SALES 
                                                            FSE-2rev       -8,905                  03/23/11   05/12/11    Saratoga Rest.Equip. Sales          
                                                            G-1             9,970                  07/30/10   09/02/10    BEEBE CONSTRUCTION SERVICES         
                                                            G-10            1,794                  04/04/11   05/13/11    BEEBE CONSTRUCTION SERVICES         
                                                            G-4             1,260                  09/28/10   11/05/10    BEEBE CONSTRUCTION SERVICES         
                                                            G-5             1,872                  09/28/10   11/05/10    BEEBE CONSTRUCTION SERVICES         
                                                            G-6               872                  09/28/10   11/05/10    BEEBE CONSTRUCTION SERVICES         
                                                            G-7             3,465                  09/28/10   11/05/10    BEEBE CONSTRUCTION SERVICES         
                                                            G-8             2,611                  09/28/10   11/05/10    BEEBE CONSTRUCTION SERVICES         
                                                            G-9(R)          2,491                  03/23/11   05/13/11    BEEBE CONSTRUCTION SERVICES         
                                                            M-01          -12,791                  03/23/11   05/13/11    SCHARF PLUMBING & HEATING           
 
20-0407   Reconstruction               0-001-008  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1583FP Reconstruction               0-001-FP1  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0886SC Visual Structural Inspection 0-001-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jerry C. Clough Elementary:
90-1492   Reconstruction               0-004-002  06/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0401   Reconstruction               0-004-003  12/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1298   Reconstruction               0-004-004  06/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1352   Reconstruction               0-004-005  05/30/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             1,311                  05/04/01   01/10/02    Kogut Electric                      
                                                            E-2            -5,621                  05/04/01   01/10/02    Kogut Electric                      
                                                            GC-1            1,610                  11/07/02   11/07/02    Murnane Bldg. Contractors           
                                                            H-1            -9,759                  05/04/01   01/08/02    HJ Brandeles                        
 
96-0441   Reconstruction               0-004-006  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1003   Reconstruction               0-004-008  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1362   Reconstruction               0-004-009  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1586   Reconstruction               0-004-010  06/01/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            21,867                  11/17/09   01/04/10    KNAPP ELECTRIC INC                  
                                                            E-2            27,468                  11/17/09   01/04/10    KNAPP ELECTRIC INC                  
                                                            GC-01          13,676                  11/17/09   01/04/10    RICHARD E ALEXANDER CO INC          
                                                            GC-02          20,161                  11/17/09   01/04/10    RICHARD E ALEXANDER CO INC          
                                                            GC-03          12,427                  11/17/09   01/04/10    RICHARD E ALEXANDER CO INC          
                                                            GC-04          21,077                  01/15/10   02/26/10    RICHARD E ALEXANDER CO INC          
                                                            GC-05           5,533                  05/24/10   08/04/10    RICHARD E ALEXANDER CO INC          
                                                            M-1             8,381                  11/17/09   01/04/10    H.J. BRANDELES CORP                 
                                                            M-2             3,593                  12/08/10   01/13/11    H.J. BRANDELES CORP                 
                                                            P-1            -2,500                  12/08/10   01/13/11    H.J. BRANDELES CORP                 
 
10-0351   Reconstruction               0-004-011  01/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             7,748                  11/01/11   06/28/13    EDGELINE ELECTRIC CORP              
                                                            E-2r            6,021                  04/11/12   10/05/12    EDGELINE ELECTRIC CORP              
                                                            G-1            14,027                  06/26/12   11/09/12    J. Priore Construction Co.          
                                                            G-2            -6,563                  12/14/12   03/06/13    J. Priore Construction Co.          
                                                            G1               -460                  03/25/13   06/14/13    RICHARD E ALEXANDER CO INC          
                                                            M1             -8,981                  04/11/12   10/05/12    H.J. BRANDELES CORP                 
                                                            S-2             4,981                  06/26/12   11/09/12    Central NY Construction             
                                                            S-3            25,132                  06/26/12   11/09/12    Central NY Construction             
                                                            S-4             6,774                  06/26/12   11/09/12    Central NY Construction             
                                                            S-5             9,653                  06/26/12   11/09/12    Central NY Construction             
                                                            S-6               413                  06/26/12   11/09/12    Central NY Construction             
                                                            SR1              -270                  12/14/12   03/06/13    Beebe Construction Services         
 
20-0408   Reconstruction               0-004-013  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1454   Reconstruction               0-004-014  05/03/21  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0883SC Visual Structural Inspection 0-004-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rome Free Academy New:
90-1871   Reconstruction               0-005-002  09/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1454   Reconstruction               0-005-003  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1163   Reconstruction               0-005-005  03/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dewitt Clinton School:
91-1410   Reconstruction               0-006-003  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0442   Reconstruction               0-006-004  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Columbus School:
90-1455   Reconstruction               0-007-003  06/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1418   Reconstruction               0-007-004  08/04/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gansevoort Elementary:
91-1100   Reconstruction               0-008-005  04/22/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1491   Reconstruction               0-008-006  07/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1420   Reconstruction               0-008-007  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0462   Reconstruction               0-008-009  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1004   Reconstruction               0-008-011  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0835   Reconstruction               0-008-012  06/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           -30,865                  12/23/11   07/16/12    Huen New York, Inc.                 
                                                            E-2            11,107                  02/04/13   06/27/13    HUEN NEW YORK INC                   
                                                            E-3               615                  02/04/13   06/27/13    HUEN NEW YORK INC                   
                                                            GC-1r          30,602                  02/09/12   05/16/12    PUTRELO BUILDING ENTERPRISES        
                                                            GC-2            2,880                  02/09/12   05/16/12    PUTRELO BUILDING ENTERPRISES        
                                                            GC-3           22,600                  08/10/12   11/28/12    Putrelo Building Enterprises        
                                                            GC-4           15,540                  10/24/12   02/22/13    Putrelo Building Enterprises        
                                                            GC-5e           6,153                  02/04/13   04/30/13    PUTRELO BUILDING ENTERPRISES        
                                                            GC-6           -4,183                  03/25/13   06/17/13    PUTRELO BUILDING ENTERPRISES        
                                                            GC-7              960                  10/29/13   11/18/13    Putrelo Building Enterprises        
                                                            GC-8            6,167                  10/29/13   11/18/13    Putrelo Building Ednterprises       
                                                            P-1            -6,609                  02/04/13   06/27/13    H.J. BRANDELES CORP                 
                                                            SC-1           14,461                  10/24/12   02/22/13    Fred Burrows Trucking & Excavating L
                                                            SC-2            5,339                  12/14/12   03/11/13    Fred Burrows Trucking & Excavating  
                                                            SC-3            5,309                  12/14/12   03/11/13    Fred Burrows Trucking & Excavating  
 
20-0409   Reconstruction               0-008-014  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1582FP Reconstruction               0-008-FP1  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0888SC Visual Structural Inspection 0-008-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lake Delta Elementary:
91-1215   Reconstruction               0-010-005  05/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0443   Reconstruction               0-010-007  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1005   Reconstruction               0-010-010  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Strough Middle School:
90-1503   Reconstruction               0-012-006  06/27/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0661   Reconstruction               0-012-007  03/24/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1158   Reconstruction               0-012-008  06/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1739   Reconstruction               0-012-009  08/18/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1006   Reconstruction               0-012-014  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0120   Reconstruction               0-012-015  10/18/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0006   Reconstruction               0-012-016  07/08/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,500                  10/18/04   10/22/04    Seabird Environ.                    
                                                            1               2,942                  12/07/04   12/09/04    HR Beebe                            
 
04-0196   Reconstruction               0-012-017  09/30/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,318                  03/14/05   03/25/05    Kogut Electric Inc                  
 
05-0258   Reconstruction               0-012-019  01/18/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001          -5,893                  09/25/06   03/15/07    Richard Alexander                   
                                                            M-001          -3,000                  07/28/06   12/18/06    M and N Plumbing Heating            
                                                            P-001            -752                  08/31/06   10/19/06    HJ Brandeles Corp                   
                                                            e-001          -1,897                  09/22/06   12/18/06    SC Spencer Electric                 
 
07-2321   Reconstruction               0-012-020  01/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             1,183                  05/24/10   08/04/10    EDGELINE ELECTRIC CORP              
                                                            E-3             3,080                  03/19/10   05/03/10    KNAPP ELECTRIC INC                  
                                                            FSE1           -9,698                  04/04/11   05/13/11    MAIN-FORD GENERAL SUPPLY            
                                                            G-1            10,710                  11/16/09   12/18/09    GEORGE A NOLE & SON INC             
                                                            G-10            7,076                  06/17/10   08/05/10    GEORGE A NOLE & SON INC             
                                                            G-11            3,774                  06/18/10   08/05/10    GEORGE A NOLE & SON INC             
                                                            G-12            9,656                  06/18/10   08/05/10    GEORGE A NOLE & SON INC             
                                                            G-13            9,429                  06/21/10   08/16/10    GEORGE A NOLE & SON INC             
                                                            G-14            8,922                  06/21/10   08/16/10    GEORGE A NOLE & SON INC             
                                                            G-15            2,100                  12/03/10   01/06/11    GEORGE A NOLE & SON INC             
                                                            G-16            6,678                  12/03/10   01/06/11    GEORGE A NOLE & SON INC             
                                                            G-17          -10,000                  01/24/11   03/03/11    GEORGE A NOLE & SON INC             
                                                            G-2            15,750                  11/16/09   12/18/09    GEORGE A NOLE & SON INC             
                                                            G-3            12,522                  01/15/10   02/26/10    GEORGE A NOLE & SON INC             
                                                            G-4            13,224                  01/15/10   02/26/10    GEORGE A NOLE & SON INC             
                                                            G-5            58,013                  01/15/10   02/26/10    GEORGE A NOLE & SON INC             
                                                            G-6             4,726                  01/15/10   02/26/10    GEORGE A NOLE & SON INC             
                                                            G-7            24,262                  01/15/10   02/26/10    GEORGE A NOLE & SON INC             
                                                            G-8             8,394                  02/10/10   04/27/10    GEORGE A NOLE & SON INC             
                                                            G-9             6,641                  06/17/10   08/06/10    GEORGE A NOLE & SON INC             
                                                            M-1            20,422                  01/15/10   02/26/10    SCHMALZ MECHANICAL CONTRACTORS      
                                                            M-2             2,162                  02/18/10   03/30/10    SCHMALZ MECHANICAL CONTRACTORS      
                                                            M-3            11,542                  02/18/10   03/30/10    SCHMALZ MECHANICAL CONTRACTORS      
                                                            M-4             5,415                  03/19/10   05/03/10    SCHMALZ MECHANICAL CONTRACTORS      
                                                            P-1           -11,429                  07/09/10   08/24/10    BELLUCCI ENTERPRISES                
                                                            R-1           -10,000                  12/14/09   02/05/10    UNIVERSAL BUILDERS GC               
                                                            SITE-1        -32,419                  12/20/11   06/25/12    CCI COMPANIES INC                   
 
12-0525   Reconstruction               0-012-021  09/23/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-REV1        -4,044                  02/03/21   03/19/21    H.R. BEEBE, INC.                    
                                                            EC-01          27,574                  08/27/19   08/28/19    ONEIDA ELECTRICAL CONTRACTORS       
                                                            EC-02          23,377                  08/27/19   08/28/19    ONEIDA ELECTRICAL CONTRACTORS       
                                                            EC-03          -4,210                  08/27/19   08/28/19    ONEIDA ELECTRICAL CONTRACTORS       
                                                            GC-01           5,093                  04/10/19   04/15/19    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-02          33,005                  08/27/19   09/13/19    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-03          30,185                  08/27/19   09/13/19    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-04           6,965                  08/27/19   09/13/19    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            MC-01          -4,601                  08/27/19   08/28/19    GIRUZZI PLUMBING & HEATING          
                                                            MC-02          -5,683                  08/27/19   08/28/19    GIRUZZI PLUMBING & HEATING          
                                                            PC-01           5,927                  08/27/19   08/28/19    H.J. BRANDELES CORP.                
                                                            PC-02            -842                  08/27/19   08/28/19    H.J. BRANDELES CORP.                
                                                            RC-01         -21,095                  04/09/19   04/15/19    EV ROOFING CORP.                    
                                                            SC-01         -19,205                  04/09/19   04/15/19    FRED BURROWS TRUCKING & EXCUVATING  
                                                            SC-01          40,737                  04/09/19   04/15/19    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            TC-01         -23,377                  08/27/19   09/13/19    JANSON INDUSTRIES                   
 
20-0410   Reconstruction               0-012-023  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1578FP Reconstruction               0-012-FP1  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0778SC Visual Structural Inspection 0-012-SC1  02/22/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ridge Mills Elementary:
91-1040   Reconstruction               0-013-001  04/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0821   Reconstruction               0-013-002  05/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0594   Reconstruction               0-013-003  02/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1007   Reconstruction               0-013-005  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0855   Reconstruction               0-013-006  11/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-01           14,548                  08/07/09   09/02/09    CJ MARLEY CONSTRUCTION              
 
09-1084   Reconstruction               0-013-007  08/04/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            7,786                  06/26/12   01/25/13    Oneida Electrical Contractors, Inc. 
                                                            FSE-1          -5,000                  10/21/11   12/12/11    JOSEPH FILHAN CO                    
                                                            GC-1            6,512                  10/21/11   12/12/11    RICHARD E ALEXANDER CO INC          
                                                            GC-2             -566                  12/14/12   03/21/13    Richard E. Alexander Co., Inc.      
                                                            P-1           -10,105                  02/09/12   01/25/13    H.J. BRANDELES CORP                 
 
20-0415   Reconstruction               0-013-009  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0889SC Visual Structural Inspection 0-013-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stadium Support (prev HS-now 0-026):
91-1291   Reconstruction               0-014-005  05/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0685   Reconstruction               0-014-006  04/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1078   Reconstruction               0-014-009  04/08/97  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1067   Reconstruction               0-014-011  06/08/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  12/10/04   12/23/04    A-Turf                              
                                                            2              -1,367                  11/30/06   01/09/07    A Turf                              
                                                            AA-1            7,704                  06/22/05   07/11/05    Seaburd Envionmental                
                                                            AA-2            3,550                  07/14/05   07/29/05    Seabird Environmental               
                                                            E-001         -26,470                  06/26/06   01/09/07    Madonia Electric                    
                                                            GC-001         15,750                  09/29/05   10/14/05    Richard ALexander                   
                                                            GC-002          7,676                  11/08/05   02/13/06    Richard Alexander                   
                                                            GC-003         81,800                  01/11/06   06/26/06    Richard Alexander Co                
                                                            GC-004         -1,867                  07/28/06   08/10/06    Richard Alexander                   
                                                            GSR-001        -7,754                  11/14/05   11/23/05    Patterson Stevens Inc               
                                                            H-001         -21,120                  05/12/06   06/23/06    Scharf Plumbing                     
                                                            P-001         -18,673                  05/12/06   06/23/06    Scharf Plumbing                     
 
06-1148   Reconstruction               0-014-012  05/25/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-01           7,062                  07/10/08   10/24/08    Sunshine Environmental Services     
                                                            AD-02           1,608                  08/22/08   03/16/09    SUNSHINE ENVIRONMENTAL              
                                                            AD-03           1,476                  08/22/08   05/11/09    SUNSHINE ENVIRONMENTAL              
                                                            AD-04         100,000                  12/03/08   04/03/09    SUNSHINE ENVIRONMENTAL              
                                                            AD-05           8,248                  12/03/08   04/03/09    SUNSHINE ENVIRONMENTAL              
                                                            AD-06          61,456                  12/03/08   04/03/09    SUNSHINE ENVIRONMENTAL              
                                                            AD-07          28,245                  12/03/08   04/03/09    SUNSHINE ENVIRONMENTAL              
                                                            EC-01           1,285                  07/10/08   01/23/09    Ridley Electric Co.,Inc             
                                                            EC-02           5,647                  07/10/08   05/11/09    Ridley Electric Co.,Inc             
                                                            EC-03           8,352                  12/03/08   05/19/09    RIDLEY ELECTRIC CO., INC.           
                                                            EC-04           4,260                  07/20/09   08/19/09    RIDLEY ELECTRIC CO INC              
                                                            GC-1           83,726                  12/03/08   04/03/09    PARK CITY BUILDERS OF NY INC.       
                                                            GC-2           12,466                  07/20/09   08/19/09    PARK CITY BUILDERS OF NY INC        
                                                            PC-1           17,481                  12/03/08   05/19/09    SUPERIOR PLUMBING & HEATING         
                                                            PC-2            1,746                  06/18/09   08/04/09    SUPERIOR PLUMBING & HEATING         
 

          Staley Upper ES:
92-0203   Reconstruction               0-016-003  09/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0072   Reconstruction               0-016-005  12/19/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AS-1          140,000                  08/19/04   09/17/04    Midlantic Environmental             
                                                            AS-2           38,000                  08/19/04     /  /      Midlantic Environmental             
 
01-1008   Reconstruction               0-016-007  05/20/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-001        1,267                  08/31/04   09/24/04    Scharf Plumbing                     
 
02-0708   Reconstruction               0-016-008  06/02/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-001          9,912                  07/23/04   07/27/04    Patricia Electric                   
                                                            EC-002         -2,493                  07/23/04   07/27/04    Patricia Electric                   
                                                            EC-003          4,259                  07/23/04   07/27/04    Patricia Electric                   
                                                            EC-004        -10,000                  10/15/04   10/26/04    Patricia Electric                   
                                                            EC-005            834                  10/14/04   10/18/04    Patricia Electric                   
                                                            GC-001          4,830                  07/23/04   07/27/04    George Nole & Son                   
                                                            GC-001         14,575                  11/08/04   12/06/04    Genesis Const.                      
                                                            GC-002           -832                  07/23/04   07/27/04    George Nole & Son                   
                                                            GC-003          1,381                  07/23/04   07/27/04    George Nole & Son                   
                                                            GC-004          3,940                  07/23/04   07/29/04    George Nole & Son                   
                                                            GC-005          2,031                  08/31/04   09/23/04    George Nole & Son                   
                                                            GC-006         29,700                  08/31/04   09/23/04    George Nole & Son                   
                                                            GC-007              0                  02/15/05   03/02/05    George Nole and Sons                
                                                            GC-008          1,240                  09/16/04   03/21/05    George Nole & Son                   
                                                            GC-009          1,620                  02/15/05   03/02/05    George Nole and Sons                
                                                            GC-010          1,030                  09/16/04   03/02/05    George Nole & Son                   
                                                            GC-011            900                  10/14/04   12/07/04    George Nole & Son                   
                                                            GC-012        -10,000                  10/15/04   10/26/04    George Nole & Son                   
                                                            GC-013         16,232                  02/15/05   03/02/05    George Nole and Sons                
                                                            HVAC-001        1,267                  10/25/04   12/21/04    Scharf Plumbing                     
                                                            HVAC-002          582                  08/31/04   09/23/04    Scharf Plumbing                     
                                                            HVAC-003      -10,000                  10/15/04   10/26/04    Scharf Plumbing                     
                                                            HVAC-004          316                  10/14/04   10/18/04    Scharf Plumbing                     
                                                            PC-001          2,000                  07/23/04   07/29/04    Scharf Plumbing                     
                                                            PC-002          3,880                  08/31/04   09/23/04    Scharf Plumbing                     
                                                            PC-003            303                  10/14/04   12/07/04    Scharf Plumbing                     
                                                            PC-004        -10,000                  10/15/04   10/26/04    Scharf Plumbing                     
                                                            PC-005            898                  10/25/04   12/21/04    Scharf Plumbing                     
 
03-0478   Reconstruction               0-016-009  10/28/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M-001         -10,000                  06/21/04   07/13/04    Schmalz Mech.                       
 
03-1278   Reconstruction               0-016-012  06/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              27,841                  01/19/05   11/14/05    HJ Brandeles Corp                   
                                                            1             -21,058                  09/06/05   09/08/05    Oneida Electrical Contractors       
                                                            1              -2,729                  11/07/05   12/07/05    R.E. ALEXANDER CO., INC.            
                                                            2              -1,216                  12/27/05   01/11/06    HJ brandeles Corp                   
 
04-1018   Reconstruction               0-016-014  05/19/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-0014         -5,000                  12/07/06   03/09/07    Usmail Electric                     
                                                            H1                640                  12/07/06   03/09/07    Anchor Heating Air Cond             
                                                            R-1                 0                  08/15/06   09/06/06    Josall Syracuse                     
                                                            R-2                 0                  08/15/06   09/06/06    Josall Syracuse                     
                                                            R-3                 0                  08/15/06   09/06/06    Josall Syracuse                     
                                                            R-4                 0                  08/15/06   09/06/06    Josall Syracuse                     
                                                            R-5                 0                  08/15/06   09/06/06    Josall Syracuse                     
                                                            R-6            -3,046                  08/15/06   09/06/06    Josall Syracuse                     
                                                            R-7            -1,650                  08/15/06   09/06/06    Josall Syracuse                     
                                                            R-8            -6,547                  12/20/06   01/30/07    Josall syracuse                     
                                                            R7             -1,650                  12/07/06   01/23/07    Josall Syracuse                     
 
06-0938   Reconstruction               0-016-015  05/29/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            123,094                  09/14/07   10/18/07    W & D SIMITH & SONS CONSTRUCTION    
                                                            02              7,170                  11/26/07   12/12/07    W&D Smith & Sons construction       
                                                            E-01            2,167                  03/20/08   07/03/09    Oneida Electrical Contractors       
                                                            E-02            7,401                  12/03/08   05/19/09    ONEIDA ELECTRICAL CONTRACTORS       
                                                            FSE-01        -13,990                  12/03/08   02/17/09    JOSEPH FILHAN COMPANY               
                                                            FSE-02          5,845                  02/28/09   06/10/09    JOSEPH FILHAN COMPANY               
                                                            GENERAL1        2,946                  12/03/08   02/18/09    RICHARD E. ALEXANDER CO             
                                                            GENERAL2        7,753                  12/03/08   02/17/09    RICHARD E. ALEXANDER CO             
                                                            M-1            14,885                  12/03/08   05/19/09    GIRUZZI PLUMBING & HEATING          
                                                            P-1            -8,832                  12/03/08   05/19/09    H.J. BRANDELES CORP.                
 
15-0337   Reconstruction               0-016-016  10/02/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1738   Reconstruction               0-016-017  07/10/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0100   Reconstruction               0-016-018  05/21/19  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1579FP Reconstruction               0-016-FP1  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stokes Elementary:
90-1480   Reconstruction               0-017-004  06/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1026   Reconstruction               0-017-006  05/13/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0202   Reconstruction               0-017-007  10/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0444   Reconstruction               0-017-008  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1009   Reconstruction               0-017-011  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0007   Reconstruction               0-017-012  07/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1296   Reconstruction               0-017-013  07/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -7,796                  04/17/08   04/18/08    GIRUZZI PLUMBING & HEATING          
                                                            01             -5,036                  04/17/08   04/18/08    GIRUZZI PLUMBING & HEATING          
                                                            01            -51,231                  07/10/08   08/18/08    MADONIA ELECTRIC, INC.              
                                                            01            -14,194                  06/18/09   08/06/09    RICHARD E ALEXANDER CO              
                                                            FSE-01         -9,595                  12/02/08   01/22/09    MAIN FORD GENERAL SUPPLY            
 
20-0411   Reconstruction               0-017-016  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0884SC Visual Structural Inspection 0-017-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Joy Elementary:
90-1515   Reconstruction               0-018-005  08/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0747   Reconstruction               0-018-007  04/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1299   Reconstruction               0-018-008  05/09/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4 rev            0                  11/21/02   12/13/02    GR Grates                           
                                                            GC-5                0                  11/21/02   12/13/02    GR Grates                           
                                                            GC-8          -23,920                  11/21/02   12/13/02    GR Grates Const.                    
                                                            P-3             1,460                  11/21/02   12/13/02    Schmalz Mech.                       
 
96-0445   Reconstruction               0-018-009  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1010   Reconstruction               0-018-011  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1553   Reconstruction               0-018-012  11/07/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1           -20,876                  09/20/17   10/12/17    Oneida Electrical Contractors       
                                                            G-2             6,765                  07/07/17   07/14/17    J. Priore Construction Co.          
                                                            G-3             5,221                  07/07/17   07/14/17    J. Priore COnstruction Co.          
                                                            G-4             4,257                  07/07/17   07/14/17    J. Priore Construction Co.          
                                                            GC-1            2,234                  11/25/16   12/12/16    J. Priore Construction Co           
                                                            M-1            20,340                  09/20/17   10/12/17    Giruzzi Plumbing & Heating          
                                                            P-1            24,895                  11/25/16   02/06/17    Superior Plumbing & Heating         
                                                            P-2            -8,581                  11/25/16   02/06/17    Superior Plumbing & Heating         
 
20-0412   Reconstruction               0-018-014  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0890SC Visual Structural Inspection 0-018-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fort Stanwix Elementary:
90-1582   Reconstruction               0-021-005  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1411   Reconstruction               0-021-007  06/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1258   Reconstruction               0-021-008  05/05/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0440   Reconstruction               0-021-010  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1011   Reconstruction               0-021-012  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1580FP Reconstruction               0-021-FP1  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Denti Elementary:
92-1465   Additions and Alterations    0-023-005  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0678   Reconstruction               0-023-006  02/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1077   Reconstruction               0-023-007  04/08/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0446   Reconstruction               0-023-008  11/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1012   Reconstruction               0-023-010  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1299   Reconstruction               0-023-011  03/25/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -4,500                  12/08/10   01/13/11    TITAN DEVELOPMENT INC               
                                                            G-2            18,715                  09/28/10   11/05/10    BEEBE CONSTRUCTION SERVICES         
                                                            G-3             2,462                  09/28/10   11/05/10    BEEBE CONSTRUCTION SERVICES         
 
11-0740   Reconstruction               0-023-012  06/22/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1              7,675                  04/09/14   04/30/14    Oneida Electrical Contractors       
                                                            E2             13,485                  11/14/14   11/21/14    Oneida Electrical Contractors       
                                                            E3              5,733                  11/14/14   11/21/14    Oneida Electrical Contractors       
                                                            GC-1            7,527                  03/25/13   06/19/13    J. PRIORE CONSTRUCTION CO INC       
                                                            GC-2           -5,000                  06/26/14   08/29/14    J. Priore Construction Co Inc       
                                                            GC-3           -1,296                  11/14/14   11/21/14    J. Priore Construction Co., Inc.    
                                                            P1              9,350                  02/04/13   09/19/13    SUPERIOR PLUMBING & HEATING         
                                                            P2             -8,734                  06/26/14   09/19/14    Superior Plumbing & Heating         
                                                            P3                485                  06/26/14   09/19/14    Superior Plumbing & Heating         
                                                            S1             17,306                  02/04/13   05/09/13    CENTRAL NY CONSTRUCTION             
                                                            S2             12,651                  06/26/14   08/29/14    Central NY Construction             
                                                            S3              7,123                  06/26/14   08/29/14    Central NY Construction             
 
20-0413   Reconstruction               0-023-014  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1581FP Reconstruction               0-023-FP1  05/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0887SC Visual Structural Inspection 0-023-SC1  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rome Free Academy (High School):
99-0889   New Construction             0-026-001  03/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001             147                  07/31/02   10/30/02    Schenectady Steel                   
                                                            00001           9,894                  07/31/02   10/30/02    Pulver Roofing                      
                                                            00001          15,479                  07/31/02   10/30/02    Utica Glass Co.                     
                                                            00001           5,713                  07/31/02   10/30/02    US Material Handling                
                                                            00001           4,993                  07/31/02   10/30/02    Scholastic Furniture                
                                                            00001           2,304                  07/31/02   10/30/02    Professional Furnishings            
                                                            00001          24,272                  07/31/02   10/30/02    Louis Picciano                      
                                                            00001          18,414                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00001           7,674                  07/31/02   10/30/02    Brosh Mech.                         
                                                            00001           8,750                  07/31/02   10/30/02    Apple Roofing                       
                                                            00001         -10,000                  07/31/02   10/30/02    Syracuse Merit Elec.                
                                                            00001           3,278                  07/31/02   10/30/02    Joseph Flihan Co.                   
                                                            00001          13,205                  07/31/02   10/30/02    Falls Earth Station                 
                                                            00001          36,767                  07/31/02   10/30/02    CCI Co.                             
                                                            00001           2,236                  12/10/03   12/23/03    Pook, Diemont & Ohl                 
                                                            00001          41,679                  12/10/03   12/26/03    Roberts Office Interiors            
                                                            00001          11,369                  12/10/03   12/23/03    Matrix Integrated Facilities        
                                                            00001          -2,463                  12/10/03   12/23/03    Scholastic Furniture                
                                                            00002           7,398                  07/31/02   10/30/02    Schenectady Steel                   
                                                            00002        -710,110                  07/31/02   10/30/02    Roberts Office Interiors            
                                                            00002           3,150                  07/31/02   10/30/02    Pulver Roofing                      
                                                            00002             893                  07/31/02   10/30/02    Utica Glass Co.                     
                                                            00002           7,226                  07/31/02   10/30/02    US Material Handling                
                                                            00002           5,694                  07/31/02   10/30/02    Scholastic Furniture                
                                                            00002           3,282                  07/31/02   10/30/02    Professional Furnishings            
                                                            00002         -47,000                  07/31/02   10/30/02    Louis Picciano                      
                                                            00002          12,250                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00002           3,248                  07/31/02   10/30/02    Brosh Mech.                         
                                                            00002           2,356                  07/31/02   10/30/02    Apple Roofing                       
                                                            00002         -22,796                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00002             768                  07/31/02   10/30/02    Joseph Flihan Co.                   
                                                            00002           9,237                  07/31/02   10/30/02    Falls Earth Station                 
                                                            00002           6,900                  07/31/02   10/30/02    CCI Co.                             
                                                            00002          30,262                  12/10/03   12/23/03    Pook, Diemont & Ohl                 
                                                            00003           7,066                  07/31/02   10/30/02    Schenectady Steel                   
                                                            00003           1,104                  07/31/02   10/30/02    Pulver Roofing                      
                                                            00003           1,827                  07/31/02   10/30/02    Utica Glass                         
                                                            00003           1,148                  07/31/02   10/30/02    US Material Handling                
                                                            00003           5,160                  07/31/02   10/30/02    Scholastic Furniture                
                                                            00003         -29,370                  07/31/02   10/30/02    Louis Picciano                      
                                                            00003          -4,240                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00003          14,049                  07/31/02   10/30/02    Brosh Mech.                         
                                                            00003          19,751                  07/31/02   10/30/02    Apple Roofing                       
                                                            00003          45,722                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00003           1,139                  07/31/02   10/30/02    Joseph Flihan                       
                                                            00003           7,792                  07/31/02   10/30/02    Falls Earth Station                 
                                                            00003          64,790                  07/31/02   10/30/02    CCI Co.                             
                                                            00003           4,500                  12/10/03   12/26/03    Roberts Office Interiors            
                                                            00004           9,727                  07/31/02   10/30/02    Schenectady Steel                   
                                                            00004           2,320                  07/31/02   10/30/02    Pulver Roofing                      
                                                            00004             905                  07/31/02   10/30/02    Utica Glass                         
                                                            00004          10,270                  07/31/02   10/30/02    Scholastic Furniture                
                                                            00004          -2,592                  07/31/02   10/30/02    Louis Picciano                      
                                                            00004          10,230                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00004          25,809                  07/31/02   10/30/02    CCI Co.                             
                                                            00004           6,940                  07/31/02   10/30/02    Brosh Mech.                         
                                                            00004           2,001                  07/31/02   10/30/02    Apple Roofing                       
                                                            00004          -3,150                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00004          21,498                  07/31/02   10/30/02    Falls Earth Station                 
                                                            00004            -500                  12/10/03   12/23/03    Pook, Diemont & Ohl                 
                                                            00004            -927                  12/10/03   12/23/03    Joseph Flihan Co.                   
                                                            00004            -500                  12/10/03   12/23/03    US Material Handling                
                                                            00005          16,185                  07/31/02   10/30/02    Schenectady Steel                   
                                                            00005             600                  07/31/02   10/30/02    Pulver Roofing                      
                                                            00005           9,105                  07/31/02   10/30/02    Utica Glass                         
                                                            00005          34,229                  07/31/02   10/30/02    Louis Picciano                      
                                                            00005          82,869                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00005          36,606                  07/31/02   10/30/02    CCI Co.                             
                                                            00005           2,416                  07/31/02   10/30/02    Brosh Mech.                         
                                                            00005           4,881                  07/31/02   10/30/02    Apple Roofing                       
                                                            00005          -1,547                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00005          49,513                  07/31/02   10/30/02    Falls Earth Station                 
                                                            00005           7,676                  12/10/03   12/26/03    Scholastic Furniture                
                                                            00005          -3,512                  12/10/03   12/23/03    Pook, Diemont & Ohl                 
                                                            00005           1,940                  12/10/03   12/23/03    US Material Handling                
                                                            00006           2,755                  07/31/02   10/30/02    Utica Glass                         
                                                            00006          -6,300                  07/31/02   10/30/02    Louis Picciano                      
                                                            00006          -3,850                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00006           1,766                  07/31/02   10/30/02    CCI Co.                             
                                                            00006           2,349                  07/31/02   10/30/02    Apple Roofing                       
                                                            00006          21,632                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00006          10,492                  07/31/02   10/30/02    Falls Earth Station                 
                                                            00006           2,948                  12/10/03   12/23/03    Schenectady Steel                   
                                                            00006          -1,000                  12/10/03   12/23/03    Brosh Mech.                         
                                                            00007          36,580                  07/31/02   10/30/02    Utica Glass                         
                                                            00007          22,255                  07/31/02   10/30/02    Louis Picciano                      
                                                            00007          10,930                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00007          19,166                  07/31/02   10/30/02    CCI Co.                             
                                                            00007             634                  07/31/02   10/30/02    Apple Roofing                       
                                                            00007           1,685                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00007           2,973                  12/10/03   12/26/03    Schenectady Steel                   
                                                            00007          12,312                  12/10/03   12/23/03    Falls Earth Station                 
                                                            00007           2,324                  12/10/03   05/13/04    Brosh Mech.                         
                                                            00008           5,663                  07/31/02   10/30/02    Utica Glass                         
                                                            00008         151,388                  07/31/02   10/30/02    Louis Picciano                      
                                                            00008           5,424                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00008          17,810                  07/31/02   10/30/02    CCI Co.                             
                                                            00008           1,405                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00008           2,479                  12/10/03   12/26/03    Schenectady Steel                   
                                                            00008          -2,000                  12/10/03   12/23/03    Falls Earth Station                 
                                                            00009            -590                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00009          19,180                  07/31/02   10/30/02    CCI Co.                             
                                                            00009           6,717                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00009             656                  12/10/03   12/23/03    Schenectady Steel                   
                                                            00009          -4,900                  12/10/03   12/23/03    Louis Picciano                      
                                                            00009          -2,000                  12/10/03   12/23/03    Utica Glass Co.                     
                                                            00009           1,950                  12/10/03   12/23/03    Falls Earth Station                 
                                                            00009             656                  12/10/03   12/23/03    Schenectady Steel                   
                                                            00010          18,828                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00010           6,894                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00010          -3,000                  12/10/03   12/23/03    Louis Picciano                      
                                                            00010          25,683                  12/10/03   04/26/04    CCI Co.                             
                                                            00010           7,757                  12/10/03   12/23/03    Schenectady Steel                   
                                                            00010           9,903                  12/10/03   12/23/03    Falls Earth Station                 
                                                            00011           5,110                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00011           4,415                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00011          20,499                  12/10/03   04/26/04    CCI Co.                             
                                                            00011         -25,539                  12/10/03   12/23/03    Louuis Picciano                     
                                                            00012          -1,632                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00012           9,911                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00012           4,468                  12/10/03   12/26/03    Schenectady Steel                   
                                                            00012          52,551                  12/10/03   05/13/04    CCI Co.                             
                                                            00013           6,857                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00013          38,169                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00013           3,700                  12/10/03   12/23/03    CCI Co.                             
                                                            00014             601                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00014           5,105                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00014          68,500                  12/10/03   04/26/04    CCI Co.                             
                                                            00015           2,330                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00015           8,787                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00015          22,391                  12/10/03   05/06/04    CCI Co.                             
                                                            00016          10,423                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00016           2,773                  07/31/02   10/30/02    Syaracuse Merit                     
                                                            00017           1,319                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00017           1,987                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00018           2,220                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00018             422                  07/31/02   10/30/02    Syracuse Merit                      
                                                            00019             650                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00019         -55,151                  12/10/03   05/13/04    Syracuse Merit                      
                                                            00020          46,810                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00020           4,414                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00021             880                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00021          -5,752                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00022          17,676                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00022          14,421                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00023          -2,000                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00023           8,257                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00024           7,782                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00024           9,924                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00025           1,669                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00025           2,716                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00026           3,999                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00026          12,728                  12/10/03   05/13/04    Syracuse Merit                      
                                                            00027          10,259                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00027          15,036                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00028           4,284                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00028          10,906                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00029           2,920                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00029           2,171                  12/10/03   12/23/03    Syracuse Merit                      
                                                            00030          18,621                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00031           4,004                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00032           4,275                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00033           9,417                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00034           2,017                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00035           4,842                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00036           6,649                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00037           4,784                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00038          20,495                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00039          15,447                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00040          14,914                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00041          17,663                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00042           5,715                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00043          26,765                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00044          24,572                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00045          12,215                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00046          30,494                  07/31/02   10/30/02    Northland Assoc.                    
                                                            00049          18,346                  12/10/03   12/26/03    Northland Assoc.                    
                                                            00050          19,514                  12/10/03   12/23/03    Northland Assoc.                    
 
05-0143   Reconstruction               0-026-002  09/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,364                  12/13/05   07/14/06    Ulster Paving Co                    
                                                            002             7,431                  07/28/06   08/25/06    Ulser Paving Co                     
                                                            003             2,496                  09/14/06   11/30/06    Ulster Paving Company               
                                                            004           -12,659                  09/14/06   03/15/07    Ulster Paving                       
 
13-1392   Reconstruction               0-026-003  09/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            -2,500                  06/26/15     /  /      Oneida Electrical Constractors      
                                                            M-1            -3,856                  06/26/15   07/22/15    Superior Plumbing & Heating         
                                                            Mech-1         -1,239                  06/29/15   07/22/15    HJ Brandeles Corp.                  
                                                            Site-1          1,200                  06/10/15   07/09/15    Central NY Construction             
 
14-0021   Reconstruction               0-026-004  07/18/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M1             -4,698                  06/29/15   07/22/15    HJ Brandeles Corp.                  
 
18-0101   Reconstruction               0-026-005  05/21/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1757   Additions and Alterations    0-026-006  06/09/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0414   Reconstruction               0-026-007  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0973   Reconstruction               0-026-008  03/05/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1237   Reconstruction               0-026-009  07/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0830FP Reconstruction               0-026-FP1  03/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0101SC Visual Structural Inspection 0-026-SC1  08/05/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0509SC Visual Structural Inspection 0-026-SC2  11/21/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0885SC Visual Structural Inspection 0-026-SC3  11/21/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administrative Building:
92-0308   Reconstruction               1-003-002  10/19/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1013   Reconstruction               1-003-006  05/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pole Barn:
95-0442   New Construction             2-025-001  12/07/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Existing Theater:
99-0202   Reconstruction               7-027-001  10/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Existing Trans. Housing:
99-0203   Reconstruction               7-028-001  10/05/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
01-0505   Reconstruction               7-999-002  01/16/02  NO CHANGE ORDERS ON ELECTRONIC FILE

WATERVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-19-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Memorial Park School:
92-1453   Reconstruction               0-003-002  08/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1165   Reconstruction               0-003-004  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0988   Reconstruction               0-003-005  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0387   Reconstruction               0-003-006  01/07/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             3,470                  01/16/04   01/29/04    Ridley Electric                     
                                                            E-2              -886                  01/04/01   12/01/03    Panko Elec.                         
                                                            GC-16          -7,200                  06/04/04   06/09/04    Putrelo Const.                      
                                                            GC-3            7,140                  01/16/04   03/08/04    Putrelo Const.                      
 
98-1189   Reconstruction               0-003-007  06/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1089   Reconstruction               0-003-008  10/16/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-11           2,442                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-13           1,050                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-14          10,920                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-15           9,944                  01/16/04   08/08/06    Putrelo Construction                
                                                            GC-7              420                  01/16/04   02/18/04    Putrelo Construction                
                                                            H-1             7,569                  01/16/04   01/29/04    Schmalz Mech. Contractors           
                                                            P-8             3,925                  01/16/04   02/18/04    Superior Plumbing                   
 
04-0933   Reconstruction               0-003-009  05/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-1           -5,000                  05/09/07   01/25/08    HR Brandeles                        
 
05-0507   Reconstruction               0-003-010  04/17/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002                 0                  12/06/06   01/23/07    Murnane Building                    
                                                            002                 0                  12/06/06     /  /      Schmalz Mechanical                  
                                                            002                 0                  12/06/06     /  /      Superior Plumbing                   
                                                            003                 0                  12/06/06   01/12/07    Bagnall Electric                    
                                                            003                 0                  01/11/07   01/24/07    Schmalz Mechanical                  
                                                            004            18,587                  12/06/06   01/30/07    Murnane Building                    
                                                            004                 0                  01/11/07   01/24/07    Bagnall Electric                    
                                                            004                 0                  11/07/07     /  /      Schmalz Mechanical Contractors      
                                                            005            -2,795                  12/06/06   01/12/07    Superior Plumbing                   
                                                            006                 0                  05/14/07   08/01/07    Schmatz Mechanical Contractors      
                                                            008              -731                  12/06/06   01/12/07    Superior Plumbing heating           
                                                            008             3,732                  05/14/07   08/01/07    Bagnall Electric                    
                                                            010            12,146                  05/18/07   08/01/07    Bagnall Electric                    
                                                            010                 0                  11/02/07   11/09/07    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            010                 0                  11/02/07   11/08/07    SCHMALZ MECHANICAL CONSTRACTORS     
                                                            011            -2,559                  11/02/07   11/08/07    SCHMALZ MECHANICAL CONTRACTORS      
                                                            011            12,270                  11/02/07   11/09/07    Central new yorkconstruction inc    
                                                            012            17,847                  11/02/07   11/09/07    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            013             2,169                  12/06/06   01/30/07    Murnane Building                    
                                                            013            18,385                  11/02/07   11/09/07    CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            015               623                  05/14/07   08/01/07    Superior Plumbing Heating           
                                                            019               263                  01/11/07   02/09/07    Murnane Building                    
 
07-1835   Reconstruction               0-003-011  12/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0935   Reconstruction               0-003-012  07/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-004          36,860                  05/23/11   07/15/11    KNAPP ELECTRIC INC                  
                                                            EC-002              0                  01/28/11   02/23/11    KNAPP ELECTRIC INC                  
                                                            EC-003              0                  01/28/11     /  /      KNAPP ELECTRIC INC                  
                                                            GC-006            669                  11/07/11   01/24/12    RICHARD E ALEXANDER CO INC          
                                                            GC-008         12,467                  11/07/11   01/24/12    RICHARD E ALEXANDER CO INC          
                                                            M-002          10,112                  09/13/10   09/28/10    J&K PLUMBING AND HEATING CO INC     
                                                            M-003         -10,249                  09/20/10   09/29/10    J&K PLUMBING AND HEATING CO INC     
                                                            M-005           6,432                  10/04/10   10/29/10    J&K PLUMBING AND HEATING CO INC     
 
11-1411   Reconstruction               0-003-013  07/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0294   Reconstruction               0-003-014  06/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M4              9,241                  10/28/16   12/12/16    Giruzzi Plumbing & Heating          
                                                            M8             18,947                  11/09/16   11/16/16    Giruzzi Plumbing & Heating          
                                                            S1             12,940                  10/28/16   12/12/16    Davis Wallbridge, Inc.              
                                                            S2              7,850                  10/28/16   12/12/16    Davis Wallbridge, Inc.              
 
16-1354   Reconstruction               0-003-015  02/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            104-MC-1        9,629                  04/17/19   04/18/19    GIRUZZI PLUMBING & HEATING          
                                                            105 EC01       60,692                  08/27/18   09/12/18    USMAIL ELECTRIC INC                 
 
20-0136   Reconstruction               0-003-016  11/28/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             -7,625                  12/21/22   12/06/23    Beebe Const Services Inc            
 
20-0612   Reconstruction               0-003-017  02/01/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04             959                  01/18/23   11/16/23    RIDLEY ELECTRIC                     
                                                            RC-01           4,315                  05/11/22   03/13/23    WCA Roofing&Sheet Metal Co Inc      
                                                            SW-09           5,350                  07/25/22   05/09/23    Centrl NY Const Inc                 
 
22-0607   Reconstruction               0-003-018  03/08/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P1              9,888                  06/07/23   01/02/24    SCHMALZ MECHANICAL CONTRACTORS      
 
02-0426FP Reconstruction               0-003-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          MS/High School:
93-0093   Additions and Alterations    0-008-004  10/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0989   Reconstruction               0-008-005  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0388   Reconstruction               0-008-006  01/07/99  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1190   Reconstruction               0-008-007  06/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1090   Additions and Alterations    0-008-008  10/16/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2               926                  01/16/04   01/29/04    Ridley Electric                     
                                                            E-3                96                  01/16/04   01/29/04    Ridley Electric                     
                                                            E-4             8,350                  01/16/04   01/29/04    Ridley Electric                     
                                                            E-5            -3,189                  01/16/04   04/13/06    Ridley Electric                     
                                                            GC-10           1,600                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-12          14,631                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-15          18,431                  01/16/04   08/08/06    Putrelo Construction                
                                                            GC-2            8,350           8,350  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-4            7,245                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-5            7,140           7,140  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-6           10,470                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-8            7,213                  01/16/04   02/18/04    Putrelo Construction                
                                                            GC-9            1,806                  01/16/04   02/18/04    Putrelo Construction                
                                                            H-2            -3,652                  01/16/04   04/13/06    Schmalz Mech. Contractors           
                                                            P-1               292                  01/16/04   01/29/04    Superior Plumbing                   
                                                            P-10              430                  01/16/04   01/29/04    Superior Plumbing                   
                                                            P-11             -677                  01/16/04   11/25/05    Superior Plumbing                   
                                                            P-2               538                  01/16/04   01/29/04    Superior Plumbing                   
                                                            P-3               200                  01/16/04   01/29/04    Superior Plumbing                   
                                                            P-5               842                  01/16/04   01/29/04    Superior Plumbing                   
                                                            P-6             2,493                  01/16/04   01/29/04    Superior Plumbing                   
                                                            P-7              -331                  01/16/04   01/29/04    Superior Plumbing                   
                                                            P-9               960                  01/16/04   01/29/04    Superior Plumbing                   
 
05-0508   Additions and Alterations    0-008-009  04/17/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001                 0                  12/04/06   01/09/07    CENTRAL NEW YORK                    
                                                            001           817,000                  12/06/06   01/30/07    Murnane building                    
                                                            001                 0                  12/06/06     /  /      Schmalz mechanical                  
                                                            001                 0                  12/06/06     /  /      Bagnall Electric                    
                                                            001                 0                  12/06/06   01/12/07    Superior Plumbing Heating           
                                                            002             7,194                  12/04/06   01/09/07    Central New York Construction       
                                                            002             4,892                  12/06/06     /  /      Bagnall Electric                    
                                                            003                 0                  12/04/06   01/09/07    Central New Yorek COnstruction      
                                                            003            -7,998                  12/06/06   01/12/07    Murnane Building                    
                                                            003              -512                  12/06/06   01/12/07    Superior Plumbing Heating           
                                                            004            10,909                  12/04/06   01/09/07    Central New York                    
                                                            004                 0                  12/06/06   01/12/07    Superior Plumbing                   
                                                            004                 0                  01/11/07     /  /      Schmalz Mechanical                  
                                                            004                 0                  11/07/07     /  /      Schmalz Mechanical Contractors      
                                                            005                 0                  12/04/06   01/09/07    Central New York                    
                                                            005          -148,360                  12/06/06   01/30/07    Murnane Building                    
                                                            005                 0                  01/11/07   01/24/07    Bagnall Electric                    
                                                            005                 0                  05/14/07   08/01/07    Schmatz Mechanical Contractors      
                                                            007                 0                  02/05/07     /  /      Bagnall Electric                    
                                                            008                 0                  12/06/06   01/30/07    Murnane Building                    
                                                            009                 0                  12/06/06   01/12/07    Superior Plumbing heating           
                                                            009             1,205                  05/14/07   08/01/07    Bagnall Electric                    
                                                            009                 0                  11/02/07     /  /      CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            009                 0                  11/02/07   11/09/07    central new york constructions      
                                                            010             3,045                  12/06/06   01/30/07    Murnane Building                    
                                                            011                 0                  12/06/06   01/23/07    Murnane Building                    
                                                            011              -962                  12/06/06   01/12/07    Superior Plumbing Heating           
                                                            011                 0                  05/18/07   08/01/07    Bagnall Electric                    
                                                            012            16,453                  05/18/07   08/01/07    Bagnall Electric                    
                                                            013               150                  01/11/07   01/24/07    Superior Plumbing heating           
                                                            014             2,627                  12/06/06   01/30/07    Murnane Building                    
                                                            015             2,132                  12/06/06   01/30/07    Murnane Building                    
                                                            016                 0                  12/06/06   01/30/07    Murnane Building                    
                                                            016               998                  05/18/07   08/01/07    Superior Plumbing Heating           
                                                            018           -21,367                  12/21/06   01/30/07    Murnane building                    
                                                            020             1,247                  01/11/07   02/09/07    Murnane Building                    
                                                            022             7,180                  01/29/07   02/22/07    Murnane Building                    
                                                            023             6,414                  02/05/07   02/22/07    Murnane Building                    
                                                            024             6,254                  02/05/07   02/22/07    Murnane Building                    
                                                            026            -2,055                  05/18/07   06/21/07    Murnane Building Contractirs        
                                                            027                 0                  11/02/07   11/09/07    MURNANE BUILDING CONTRACTORS, INC.  
                                                            028            -3,388                  11/02/07   11/09/07    MURNANE BUILDING CONTRACTORS, INC.  
 
07-1836   Reconstruction               0-008-010  12/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0936   Reconstruction               0-008-011  07/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-005           6,365                  08/30/11   09/30/11    KNAPP ELECTRIC INC                  
                                                            E-006           2,228                  06/03/13   06/14/13    Knapp Electric, Inc.                
                                                            E-007          -3,187                  07/09/12   07/03/13    KNAPP ELECTRIC INC                  
                                                            E-008           5,948                  07/09/12   07/03/13    KNAPP ELECTRIC INC                  
                                                            EC-001         13,477                  01/28/11   02/23/11    KNAPP ELECTRIC INC                  
                                                            GC-001         -1,000                  10/04/10   10/29/10    RICHARD E ALEXANDER CO INC          
                                                            GC-002              0                  01/28/11   02/23/11    RICHARD E ALEXANDER CO INC          
                                                            GC-003          2,686                  10/03/11   01/19/12    RICHARD E ALEXANDER CO INC          
                                                            GC-004          1,188                  10/03/11   01/19/12    RICHARD E ALEXANDER CO INC          
                                                            GC-005          1,311                  06/03/13   06/14/13    RICHARD E ALEXANDER CO INC          
                                                            GC-007        -21,872                  11/07/11   01/24/12    RICHARD E ALEXANDER CO INC          
                                                            GC-009        -20,756                  08/27/12   12/14/12    RICHARD E ALEXANDER CO INC          
                                                            M-001           9,426                  09/13/10   09/28/10    J&K PLUMBING AND HEATING CO INC     
                                                            M-004           9,976                  01/28/11   02/23/11    J&K PLUMBING & HEATING CO INC       
                                                            M-006               0                  01/28/11   02/23/11    J&K PLUMBING & HEATING CO INC       
                                                            M-007           3,434                  08/30/11   09/30/11    J&K PLUMBING AND HEATING CO INC     
                                                            M-008          19,060                  10/24/11   02/23/12    J&K PLUMBING AND HEATING CO INC     
                                                            M-009           5,778                  08/27/12   06/14/13    J&K PLUMBING AND HEATING CO INC     
                                                            M-010           2,972                  03/30/12   08/22/12    J&K PLUMBING AND HEATING CO INC     
                                                            PC-001              0                  01/28/11   02/23/11    DON BROSH MASTER PLUMBER INC        
                                                            PC-002         -3,500                  06/27/12   12/11/12    Don Brosh Master Plumber, Inc.      
                                                            SC-001         92,196                  09/13/10   09/28/10    BOLAND'S EXCAVATING AND TOPSOIL INC 
                                                            SC-003              0                  03/18/11   04/08/11    BOLAND'S EXCAVATING AND TOPSOIL INC 
                                                            SC-004         -1,878                  03/18/11   04/08/11    BOLAND'S EXCAVATING AND TOPSOIL INC 
                                                            SC-005         -1,680                  08/27/12   12/14/12    BOLAND'S EXCAVATING AND TOPSOIL INC 
 
11-1412   Reconstruction               0-008-012  07/12/12  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0295   Additions and Alterations    0-008-013  06/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2            -2,794                  11/18/16   01/06/17    Patricia Electric                   
                                                            E1              8,118                  10/28/16   12/12/16    Patricia Electric                   
                                                            E3            -65,000                  11/18/16   01/06/17    Patricia Electric                   
                                                            G1            -60,621                  11/09/16   11/16/16    M.J. Dakota, Inc.                   
                                                            M1              6,300                  10/28/16   12/12/16    Giruzzi Plumbing & Heating          
                                                            M10               -81                  11/09/16   11/16/16    Giruzzi Plumbing & Heating          
                                                            M2             10,676                  10/28/16   12/12/16    Giruzzi Plumbing & Heating          
                                                            M3              4,203                  10/28/16   12/12/16    Giruzzi Plumbing & Heating          
                                                            M5              9,142                  10/28/16   12/12/16    Giruzzi Plumbing & Heating          
                                                            M6             10,907                  10/28/16   12/12/16    Giruzzi Plumbing & Heating          
                                                            M7             22,975                  10/28/16   12/12/16    Giruzzi Plumbing & Heating          
                                                            MR-1           22,330                  10/28/16   12/12/16    National Building & Restoration Corp
                                                            MR-2           28,253                  10/28/16   12/12/16    National Building & Restoration Corp
                                                            MR-3           34,504                  10/28/16   12/12/16    National Building & Restoration Corp
                                                            MR-4           20,914                  10/28/16   12/12/16    National Building & Restoration Corp
                                                            MR-5           -3,647                  11/25/16   01/06/17    National Building & Restoration Corp
                                                            P1             25,885                  10/28/16   12/12/16    H.J. Brandeles Corp.                
                                                            P2              8,261                  10/28/16   12/12/16    H.J. Brandeles Corp.                
                                                            S3             -2,473                  11/09/16   11/16/16    Davis Wallbridge, Inc.              
 
16-1355   Reconstruction               0-008-014  02/20/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101SW-01       -2,902                  11/15/19   01/17/20    EZ PAVING/SEALCOAT LLC              
                                                            102GC-01         -980                  06/24/20   08/05/20    RICHARD E. ALEXANDER CO.,INC.       
                                                            103-PC-1       -5,000                  04/17/19   04/18/19    H.J. BRANDELES CORP                 
                                                            105-EC-2       17,992                  04/17/19   04/18/19    USMAIL ELECTRIC INC.                
                                                            105-EC-3       18,175                  04/17/19   04/18/19    USMAIL ELECTRIC INC.                
 
18-1775   Reconstruction               0-008-015  07/22/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,000                  06/24/20   07/22/20    USMAIL ELECTRIC, INC.               
 
20-0613   Additions and Alterations    0-008-016  02/01/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           7,131                  11/10/22   07/27/23    RIDLEY ELECTRIC                     
                                                            EC-02          19,000                  11/10/22   07/27/23    RIDLEY ELECTRIC                     
                                                            EC-03             445                  01/18/23   11/16/23    RIDLEY ELECTRIC                     
                                                            GEO-01          3,051                  08/19/21   05/17/22    KESTREL CONSTRUCTION SERVICES       
                                                            GEO-02         15,400                  05/11/22   03/13/23    American Auger&Ditching Co Inc      
                                                            GEO-03          5,703                  05/11/22   03/13/23    American Auger&Ditching Co Inc      
                                                            MC-01           5,348                  11/10/22   12/13/23    GIRUZZI PLUMBING & HEATING          
                                                            PC-02             911                  11/10/22   07/27/23    HJ BRANDELES CORP                   
                                                            SW-01          26,536                  05/20/22   05/01/23    Central NY Const Inc                
                                                            SW-02          35,320                  05/20/22     /  /      Centrl NY Const Inc                 
                                                            SW-03          27,500                  05/20/22     /  /      Centrl NY Const Inc                 
                                                            SW-04           2,500                  05/20/22     /  /      Centrl NY Const Inc                 
                                                            SW-06           7,861                  05/20/22   05/01/23    Centrl NY Const Inc                 
                                                            SW-07          17,621                  05/20/22   05/01/23    Centrl NY Const Inc                 
                                                            SW-08           4,903                  07/25/22   05/09/23    Central NY Const Inc                
 
22-0608   Reconstruction               0-008-017  03/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0425FP Reconstruction               0-008-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
93-1558   Additions and Alterations    5-001-001  07/01/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0992   Reconstruction               5-001-002  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0389   Reconstruction               5-001-003  01/07/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           68,145                  01/16/04   03/08/04    Putrelo Construction                
 
98-1191   Reconstruction               5-001-004  06/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1091   Reconstruction               5-001-005  10/16/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-4               329                  01/16/04   01/29/04    Superior Plumbing                   
 
05-0509   Additions and Alterations    5-001-006  04/17/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006                 0                  12/06/06   01/30/07    Murnane Building                    
                                                            006            27,800                  12/06/06   01/30/07    Central New York                    
                                                            006            -5,475                  12/06/06   01/12/07    Superior Plumbing Heating           
                                                            006                 0                  02/05/07   02/12/07    Bagnall Electric                    
                                                            007            -3,001                  12/06/06   01/30/07    Murnane Building                    
                                                            007                 0                  12/06/06   01/12/07    Superior Plumbing Heating           
                                                            007             1,242                  05/18/07   06/21/07    Central NY Construction             
                                                            008             3,439                  05/18/07   06/21/07    Central NY Construction             
                                                            009                 0                  12/06/06   01/30/07    Murnane Building                    
                                                            009                 0                  11/07/07   11/08/07    Schmalz Mechanical Contractors      
                                                            010            -1,483                  12/06/06   01/12/07    Superior Plumbing Heating'          
                                                            011            12,270                  11/02/07     /  /      CENTRAL NEW YORK CONSTRUCTION, INC. 
                                                            012             1,281                  12/06/06   01/12/07    Murnane Building                    
                                                            012             4,315                  12/06/06   01/12/07    Superior Plumbing Heating           
                                                            014             4,636                  01/11/07   01/24/07    Superior Plumbing Heating           
                                                            017             1,722                  12/06/06   01/30/07    Murnane Building                    
                                                            017             1,305                  05/18/07   08/01/07    Superior Plumbing Heating           
                                                            018                 0                  05/18/07   08/01/07    Superior Plumbing Heating           
                                                            019                 0                  05/18/07   08/01/07    Superior Plumbing Heating           
                                                            020               -51                  05/18/07   08/01/07    Superior Plumbing Heating           
                                                            021            17,654                  01/11/07   02/09/07    Murnane Building                    
 
14-0296   Reconstruction               5-001-008  06/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M9              4,376                  11/09/16   11/16/16    Giruzzi Plumbing & Heating          
                                                            P3              1,051                  10/28/16   12/12/16    H.J. Brandeles Corp.                
 
16-1356   Reconstruction               5-001-009  02/20/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0614   Reconstruction               5-001-010  02/01/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01           3,750                  11/10/22   07/27/23    HJ BRANDELES CORP.                  
                                                            SW-05           4,410                  05/20/22     /  /      Central NY Const Inc                
 
22-0609   Reconstruction               5-001-011  03/08/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Waterville Library:
04-0766   New Construction             6-014-001  03/31/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           2,300                  11/16/05   11/22/06    Bagnall electric                    
                                                            E-002             758                  05/08/06   11/22/06    Bagnall Electric                    
                                                            E-003             552                  09/14/06   12/18/06    Bagnali Electric                    
                                                            G-001         -32,545                  12/04/08   01/22/09    RICHARD E. ALEXANDER CO., INC.      
                                                            P-001            -740                  09/14/06   01/30/07    Savoy Joseph                        
 

          Storage/Concession/Toilet Bldg:
96-0990   New Construction             7-011-001  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Observation/Broadcast Booth:
96-0991   New Construction             7-012-001  04/07/97  NO CHANGE ORDERS ON ELECTRONIC FILE

SHERRILL CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-20-00-05
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          W.A. Wettel Elementary School:
90-0605   Additions and Alterations    0-002-002  02/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1216   Reconstruction               0-002-003  03/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1240   Additions and Alterations    0-002-004  05/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00302C         20,660                  01/22/03   02/20/03    Bette&Cring                         
                                                            00310-08       -6,269                  01/22/03   02/20/03    Syracuse Mosaic terrazzo Corp       
                                                            0302C-61       18,324                  02/07/03   02/20/03    Bette& Cring                        
                                                            0310-004       -6,810                  08/27/02   10/28/02    Syracuse Mosaic Terazzo             
                                                            302C-030        4,217                  08/27/02   10/28/02    Bette & Cring                       
                                                            302C-044        1,986                  01/08/03   02/27/03    Bette & Cring                       
                                                            302C-057       -5,496                  01/22/03   02/20/03    Bette& Cring                        
                                                            302C046B       -1,437                  01/08/03   02/27/03    Bette & Cring                       
                                                            305B-001      -10,000                  08/27/02   10/28/02    Huen NY                             
                                                            305B-003        7,900                  08/27/02   10/28/02    Huen NY                             
                                                            305B-004          469                  01/08/03   02/27/03    Huen NY                             
                                                            305B-006        7,323                  01/22/03   02/20/03    Huen NY                             
                                                            306C-012       13,000                  01/08/03   02/27/03    Avala Contracting                   
                                                            426610          4,994                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -3,248                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610          9,653                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -1,509                  12/17/02   01/13/03    Bellucci Enterprises                
                                                            426610.       -16,326                  08/30/02   10/21/02    Avala Contracting                   
                                                            426610.         4,795                  08/30/02   10/21/02    Avala Contracting                   
                                                            426610.        -9,046                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         2,981                  08/30/02   10/21/02    Delaney Const.                      
                                                            426610.0          824                  04/02/03   04/18/03    Huen NY                             
 
04-0360   Reconstruction               0-002-005  02/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-L03              0                  11/04/05   01/11/06    RITTER & PARATORE CONTRACTING, INC. 
                                                            E-03                0                  10/24/05   12/07/05    Huen new York                       
                                                            E-04                0                  01/26/06   07/05/06    Huen New York                       
                                                            E-13              553                  02/22/07   08/15/07    Huen New York                       
                                                            G-20          -12,000                  03/19/07   04/03/07    Puterlo Construction                
                                                            G-22           -3,362                  04/03/00   04/03/07    Puterlo Construction                
                                                            H-01                0                  10/24/05   08/06/10    HJ Brnadeles Corp                   
                                                            H-02                0                  12/12/05   06/26/06    Hj brandeles Corp                   
                                                            H-05                0                  04/12/06   08/06/10    Hj brandles Corp                    
                                                            P-03                0                  12/12/05     /  /      Superior Plumbing Heating           
                                                            RB-04          -1,800                  10/19/06   11/03/06    Pulver Roofing                      
 
07-1173   Reconstruction               0-002-006  08/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-03            5,700                  08/12/09   08/28/09    HUEN NEW YORK INC                   
                                                            E-06              837                  11/13/09   12/30/09    HUEN NEW YORK INC                   
                                                            E-12            1,355                  12/11/09   02/04/10    HUEN NEW YORK INC                   
                                                            E-29              446                  10/07/10   11/12/10    HUEN NEW YORK INC                   
                                                            E-32              800                  11/15/10   12/01/10    HUEN NEW YORK INC                   
                                                            GC-02               0                  03/23/09   07/03/09    PARK CITY BUILDERS OF NEW YORK, INC.
                                                            GC-06               0                  06/01/09   08/19/09    PARK CITY BUILDERS OF NEW YORK, INC.
                                                            GC-17          -6,686                  09/25/09   10/13/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-18            -354                  09/25/09   10/13/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-26          -5,141                  12/03/09   12/14/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-28          23,141                  12/03/09   12/15/10    PARK CITY BUILDERS OF NEW YROK INC  
                                                            GC-45          12,666                  10/01/10   11/12/10    PARK CITY BUILDERS OF NEW YORK INC  
 
16-0980   Reconstruction               0-002-007  10/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0258   Reconstruction               0-002-008  02/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAFEC-04            0                  07/09/19   07/10/19    RIDLEY ELECTRIC                     
                                                            AAFGC-03            0                  10/03/18   10/29/18    WATCHDOG BUILDING LLC               
                                                            AAFSC-08            0                  06/12/20   08/04/20    SMITH SITE DEVELOPMENT              
                                                            AAFSC207            0                  02/08/19   03/14/19    WATCHDOG BUILDING PARTNERS          
                                                            EC-06           4,869                  07/09/19   07/10/19    RIDLEY ELECTRIC CO.,INC.            
                                                            EC-07         -52,159                  06/12/20   07/20/20    RIDLRY ELECTRIC CO.,INC.            
                                                            GC-06             710                  11/05/18   01/23/19    BEEBE CONSTRUCTION SERVICES INC     
                                                            GC-08           2,014                  01/22/19   02/11/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            SC2-01          2,368                  06/12/20   08/04/20    SMITH SITE DEVELOPMENT              
                                                            SC2-02          5,583                  10/23/19   10/28/19    SMITH SITE DEVELOPMENT              
                                                            SC2-03          6,591                  02/06/20   03/16/20    SMITH SITE DEVELOPMENT              
                                                            SC2-04         32,263                  02/06/20   03/16/20    SMITH SITE DEVELOPMENT              
                                                            SC2-05         34,857                  02/06/20   03/16/20    SMITH SITE DEVELOPMENT              
                                                            SC2-06         29,069                  02/06/20   03/16/20    SMITH SITE DEVELOPMENT              
                                                            SC2-07         31,780                  02/06/20   03/16/20    SMITH SITE DEVELOPMENT              
                                                            SC2-08        -57,250                  06/12/20   08/04/20    SMITH SITE DEVELOPMENT              
 
21-0010   Reconstruction               0-002-009  08/07/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -4,450                  06/23/22   03/13/23    Corp Flooring Innovations Inc       
 
21-1977   Reconstruction               0-002-010  11/08/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -4,000                  07/13/23     /  /      CORPORATE FLOORING INNOVATIONS      
 

          J.D. George Elementary School:
93-1437   Reconstruction               0-005-003  06/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1238   Additions and Alterations    0-005-004  05/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00302C            814                  01/22/03   02/20/03    Bette & Cring                       
                                                            00302C         -5,266                  01/22/03   02/20/03    Bette & Cring                       
                                                            00302C         -6,941                  02/10/03   02/19/03    Bette& Cring                        
                                                            00304           2,737                  03/29/04   12/31/04    Bellucci Ent.                       
                                                            00305A          3,893                  01/22/03   02/20/03    Huen New York                       
                                                            00305A            413                  04/02/03   04/18/03    Huen New York                       
                                                            00305A           -592                  09/22/03   09/25/03    Huen New York                       
                                                            00305A         -7,680                  09/22/03   09/25/03    Huen New York                       
                                                            00308           5,660                  03/29/04   04/30/04    Tougher Industries                  
                                                            00310-09          655                  01/22/03   02/20/03    Syracuse Mosaic Terrazzo            
                                                            01-310           -375                  08/27/02   10/28/02    Syracuse Mosaic Terazzo             
                                                            049            10,366                  01/22/03   02/20/03    Bette & Cring                       
                                                            051            75,865                  01/22/03   02/20/03    Bette & Cring                       
                                                            054            29,224                  01/22/03   02/20/03    Bette & Cring                       
                                                            302C-031        9,228                  08/27/02   10/28/02    Bette & Cring                       
                                                            302C-039       -2,998                  01/08/03   02/27/03    Bette & Cring                       
                                                            302C-040       -4,400                  01/08/03   02/27/03    Bette & Cring                       
                                                            302C-041        1,756                  01/08/03   02/27/03    Bette & Cring                       
                                                            305A-009          428                  01/08/03   02/27/03    Huen New York                       
                                                            307-002         3,365                  01/08/03   02/27/03    Buffalo Hotel Supply                
                                                            310-003          -945                  08/27/02   10/28/02    Syracuse Mosaic Terazzo             
                                                            310-006           421                  08/27/02   10/28/02    Syracuse Mosaic Terazzo             
                                                            42610.         10,438                  08/30/02   10/21/02    Avala Contracting                   
                                                            426610         19,287                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -4,869                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610          9,653                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -9,650                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -1,509                  12/17/02   01/13/03    Bellucci Ent.                       
                                                            426610          7,680                  04/02/03   04/18/03    Huen New York                       
                                                            426610.        -2,964                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         5,184                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         8,934                  08/30/02   10/21/02    Avala Contracting                   
                                                            426610.        11,026                  08/30/02   10/21/02    Avala Contracting                   
                                                            426610.        21,849                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         2,918                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         3,175                  08/30/02   10/21/02    Delaney Const.                      
                                                            426610.        -2,965                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         2,249                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.       -61,955                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        52,835                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        -5,718                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         9,228                  08/30/02   10/21/02    Bette & Cring                       
 
04-0361   Reconstruction               0-005-005  02/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-16                0                  04/12/06   06/05/06    Puterlo Construction                
                                                            G-18            7,476                  10/19/06   11/03/06    Puterlo Construction                
                                                            RA-01               0                  10/24/05   11/07/05    Deluxe Roofing Sheet metal          
                                                            RA-01               0                  09/29/06   10/24/06    Delixe roofing Sheet                
 
07-1174   Reconstruction               0-005-006  08/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-04            2,679                  11/13/09   12/30/09    HUEN NEW YORK INC                   
                                                            E-07              553                  12/03/09   12/15/10    HUEN NEW YORK INC                   
                                                            E-19            4,250                  03/19/10   05/26/10    HUEN NEW YORK INC                   
                                                            E-28            1,639                  10/06/10   11/12/10    HUEN NEW YORK INC                   
                                                            GC-08          -3,074                  06/01/09   08/18/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-25           8,018                  11/13/09   12/30/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-39           2,463                  03/19/10   05/26/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-46             935                  10/01/10   11/12/10    PARK CITY BUILDERS OF NEW YORK INC  
 
16-0981   Reconstruction               0-005-007  10/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0259   Reconstruction               0-005-008  02/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAFGC-05            0                  10/03/18   10/29/18    WATCHDOG BUILDING PARTNERS LLC      
                                                            AAFSC204            0                  11/05/18   01/23/19    SMITH SITE DEVELOPMENT              
                                                            AAFSC205            0                  01/22/19   02/11/19    SMITH SITE DEVELOPMENT              
                                                            AAFSC206            0                  01/22/19   02/11/19    SMITH SITE DEVELOPMENT              
                                                            GC-01           2,728                  10/03/18   10/29/18    BEEBE CONSTRUCTION SERVICES INC     
 
17-0445   Reconstruction               0-005-009  09/06/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          2,930                  02/26/18   03/07/18    Diamond & Thiel Construction Co.    
 
18-0938   Reconstruction               0-005-010  01/16/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          12,166                  05/20/19   05/21/19    KUEHNE CONSTRUCTION                 
 
19-0190   Reconstruction               0-005-011  09/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           4,500                  06/24/20   08/05/20    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-02           3,200                  06/24/20   08/05/20    J.PRIORE CONSTRUCTION CO.,INC.      
 
02-0620FP Reconstruction               0-005-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle/High School:
91-1129   Reconstruction               0-006-003  04/16/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1260   Reconstruction               0-006-004  06/11/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0672   Additions and Alterations    0-006-005  04/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1116   Reconstruction               0-006-006  04/23/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1237   Additions and Alterations    0-006-008  05/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00301C         -4,700                  01/22/03   02/20/03    Delaney Const.                      
                                                            00302C         -5,330                  08/30/02   10/21/02    Bette & Cring                       
                                                            00302C            378                  01/22/03   02/20/03    Bette & Cring                       
                                                            00302C         -6,940                  02/10/03   02/19/03    Bette & Cring                       
                                                            00302C00       33,252                  08/30/02   10/21/02    Bette & Cring                       
                                                            00304          -2,361                  03/29/04   12/31/04    Bellucci Ent.                       
                                                            00305A          2,703                  04/02/03   04/18/03    Huen New York                       
                                                            00308           2,640                  03/29/04   03/29/04    Tougher Industries                  
                                                            00500306       10,000                  06/05/03   06/06/03    AVALA Contracting                   
                                                            006-0030        2,462                  04/02/03   04/18/03    Huen New York                       
                                                            00600304          376                  03/01/04   04/23/04    Bellucci Enterprises                
                                                            007              -592                  09/22/03   09/25/03    Huen New York                       
                                                            01-301C        -5,890                  08/27/02   10/28/02    Syracuse Mosaic Terazzo             
                                                            02-00308       -3,589                  01/29/03   02/20/03    Tougher Industries                  
                                                            052             1,223                  01/22/03   02/20/03    Bette & Cring                       
                                                            17                  0                  08/30/02     /  /      Bette & Cring                       
                                                            301C-008       12,000                  01/08/03   02/27/03    Delaney Const.                      
                                                            302C-032       26,808                  08/30/02   10/21/02    Bette & Cring                       
                                                            302C-034       -5,283                  01/08/03   02/27/03    Bette & Cring                       
                                                            302C-042        1,223                  01/08/03   02/27/03    Bette & Cring                       
                                                            302C-045     -103,800                  01/08/03   02/27/03    Bette & Cring                       
                                                            310-002         2,920                  08/27/02   10/28/02    Syracuse Mosaic Terazzo             
                                                            42610.          2,935                  08/30/02   10/21/02    Bette & Cring                       
                                                            42610.00        5,001                  08/30/02   10/21/02    Avala Contracting                   
                                                            42610.00        7,906                  08/30/02   10/21/02    Huen New York                       
                                                            42610.01       -4,500                  08/30/02   10/21/02    Bellucci Ent.                       
                                                            42610.01       -2,285                  08/30/02   10/21/02    Buffalo Hotel Supply                
                                                            42610.01       -1,113                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610            173                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610          1,311                  12/17/02   01/13/03    Bette & Cring                       
                                                            426610         18,818                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -2,000                  04/02/03   04/18/03    Huen New York                       
                                                            426610          1,496                  04/02/03   04/18/03    Huen New York                       
                                                            426610          7,597                  04/02/03   04/18/03    Huen New York                       
                                                            426610.        -5,692                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        72,399                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        -1,122                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         1,684                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         3,912                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         3,921                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         4,074                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        11,833                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         3,651                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        87,835                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         2,692                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        12,168                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.       -25,000                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        -5,200                  08/30/02   10/21/02    Nickerson Corp                      
                                                            426610.        -3,000                  08/30/02   10/21/02    Nickerson Corp                      
                                                            426610.       -37,500                  08/30/02   10/21/02    Tougher Industries                  
                                                            426610.        16,000                  08/30/02   10/21/02    Bellucci Ent.                       
                                                            426610.        -3,735                  08/30/02   10/21/02    Syracuse Mosaic Terrazzo            
                                                            426610.        16,000                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.        -8,500                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.0       96,594                  08/30/02   10/21/02    Delaney Const.                      
                                                            426610.0       -2,580                  08/30/02   10/21/02    Bette & Cring                       
 
04-0362   Additions and Alterations    0-006-009  02/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C0 L03              0                  10/31/05     /  /      Ritter and Paratore Contracting     
                                                            CO-E02              0                  05/15/08   09/09/08    HUEN NEW YORK, INC.                 
                                                            CO-E10              0                  05/15/08   09/09/08    HUEN NEW YORK,INC.                  
                                                            CO-G06         66,868                  04/03/09     /  /      PUTERLO CONSTRUCTION COMPANY        
                                                            CO-G23           -559                  05/15/08   08/18/08    PUTRELO CONSTRUCTION CO., INC.      
                                                            CO-H04              0                  01/24/06   05/24/06    H.J. BRANDELES CORPORATION          
                                                            CO-L01              0                  10/24/05   10/27/05    King & King, Architects LLP         
                                                            CO-L02              0                  05/15/08   08/18/08    RITTER & PARATORE CONTRACTING, INC. 
                                                            CO-L05              0                  05/15/08   08/18/08    RITTER & PARATORE CONTRACTING, INC. 
                                                            CO-P05              0                  01/24/06   05/24/06    SUPERIOR PLUMBING & HEATING         
                                                            CO-P06              0                  01/24/06   05/24/06    SUPERIOR PLUMBING & HEATING         
                                                            CO-P07         -6,169                  04/12/06   05/26/06    SUPERIOR PLUMBING AND HEATING       
                                                            E-01                0                  10/24/05   08/06/10    Huen New york                       
                                                            E-05                0                  01/26/06   07/05/06    Huen new York                       
                                                            E-06            4,493                  09/25/06   01/30/07    Huen New York                       
                                                            E-07            8,477                  09/25/06   07/16/09    Huen New York                       
                                                            E-08            3,419                  09/25/06   12/18/06    Huen new York                       
                                                            E-09           39,791                  09/25/06   08/06/08    Huen new York                       
                                                            E-11            5,828                  04/12/06   07/16/09    Huen New York                       
                                                            E-12            1,737                  07/21/06   12/18/06    Huen New York                       
                                                            E-14            1,386                  02/22/07   08/15/07    Huen New York                       
                                                            G-07                0                  10/24/05   11/07/05    Puterlo Construction                
                                                            G-08                0                  10/24/05   11/07/05    Puterlo Construction                
                                                            G-10           19,655                  01/20/06   07/24/06    Puterlo Construction                
                                                            G-13                0                  01/20/06   07/24/06    Puterlo Construction                
                                                            G-15                0                  07/20/06   07/24/06    Puterlo Construction                
                                                            G-17                0                  10/19/06   11/03/06    Puterlo Construction                
                                                            G-19           -1,230                  10/19/06   11/03/06    Puterlo Construction                
                                                            G-21            3,312                  03/19/07   04/03/07    Puterlo Construction                
                                                            G01                 0                  10/24/05   11/07/05    Puterlo Construction Co             
                                                            G02                 0                  10/24/05   11/07/05    Puterlo construction                
                                                            G03                 0                  10/24/05   11/07/05    Puterlo Construction                
                                                            G04                 0                  10/24/05   11/07/05    Puterlo Construction                
                                                            G05                 0                  10/24/05   11/07/05    Puterlo Construction                
                                                            G06                 0                  10/24/05   11/07/05    Puterlo Construction Co             
                                                            G11                 0                  01/20/06   02/09/07    Puterlo Construction                
                                                            G12                 0                  01/20/06   02/09/07    Puterlo Construction                
                                                            G14                 0                  01/20/06   02/09/07    Puterlo Construction                
                                                            H-07            2,436                  04/12/06   07/16/09    Hj brandeles Corp                   
                                                            H-08           -1,112                  07/21/06   12/18/06    HJ brandeles Corp                   
                                                            H03                 0                  12/14/05   01/19/06    Hj brandeles Corp                   
                                                            L-04                0                  12/12/05   06/26/06    Ritter and Paratore Contracting     
                                                            L-06                0                  05/15/08   09/09/08    RITTER & PARATORE CONTRACTING, INC. 
                                                            L-08            3,667                  04/12/06   06/05/06    Ritter Paratore Contacting          
                                                            L-09            4,036                  12/19/06   01/30/07    Ritter Paratore Contracting         
                                                            L01                 0                  10/24/05   11/07/05    Ritter and Paratore Contracting     
                                                            L07            -2,370                  06/22/06   08/11/06    Ritter Paratore Contracting         
                                                            P-01                0                  10/12/05   10/17/05    Superior Plumbing heating           
                                                            P-07           -6,169                  04/12/06     /  /      Superior Plumbing Heating           
                                                            P-4                 0                  12/12/05     /  /      superior Plumbing Heating           
                                                            RA-02               0                  10/24/05   11/07/05    DELUXE ROOFING & SHEET METAL CROP.  
                                                            RA-03               0                  10/24/05   11/07/05    Deluxe Roofing and Sheet Metal      
                                                            RA-04          11,988                  04/12/06   06/23/06    Deluxe Roofing sheet Metal          
                                                            RA-05          -8,279                  07/21/06   08/09/06    Deluxe roofing Sheet metal          
                                                            RB-02          41,900                  04/12/06   06/05/06    Pulver Roofing                      
                                                            RB-03         -23,320                  04/12/06   06/05/06    Pulver Roofing                      
 
07-1175   Reconstruction               0-006-010  08/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-11            1,206                  12/11/09   02/04/10    HUEN NEW YORK INC                   
                                                            E-14            3,910                  02/03/10   06/01/10    HUEN NEW YORK INC                   
                                                            E-17              312                  03/19/10   05/26/10    HUEN NEW YORK INC                   
                                                            E-20            2,549                  04/20/10   08/23/10    HUEN NEW YORK INC                   
                                                            E-21            2,868                  07/15/10   11/30/10    HUEN NEW YORK INC                   
                                                            E-22            4,200                  07/15/10   11/30/10    HUEN NEW YORK INC                   
                                                            E-23            8,150                  07/15/10   11/30/10    HUEN NEW YORK INC                   
                                                            E-24            3,900                  07/15/10   11/30/10    HUEN NEW YORK INC                   
                                                            E-26            1,926                  10/06/10   11/12/10    HUEN NEW YORK INC                   
                                                            E-30            6,160                  11/15/10   12/01/10    HUEN NEW YORK INC                   
                                                            GC-05               0                  06/01/09   08/19/09    PARK CITY BUILDERS OF NEW YORK, INC.
                                                            GC-09               0                  06/01/09   08/18/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-14          37,105                  08/26/09   09/16/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-16           4,842                  09/25/09   10/13/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-19         -18,000                  09/25/09   10/13/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-20          16,323                  11/13/09   12/30/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-21          15,145                  11/13/09   12/30/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-22           3,924                  11/13/09   12/30/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-30           4,295                  12/03/09   12/15/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-32           4,641                  12/11/09   02/04/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-34          -4,725                  12/11/09   02/04/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-35           6,990                  12/11/09   02/04/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-36          16,856                  02/18/10   05/10/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-38          24,715                  03/19/10   05/26/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-40             519                  04/09/10   12/22/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-41           1,983                  08/09/10   11/30/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-42             540                  08/09/10   11/30/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-44           7,343                  08/09/10   11/30/10    PARK CITY BUILDERS OF NEW YROK INC  
                                                            GC-47           1,469                  10/06/10   11/12/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-48           2,045                  10/06/10   11/12/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-49          11,003                  03/01/11   03/30/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-50          -4,416                  03/01/11   03/30/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-51           5,515                  03/01/11   03/30/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-52          28,577                  03/01/11   03/30/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-53           2,487                  03/01/11   03/30/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-54           1,263                  03/30/11   04/29/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            H-01          -20,000                  06/28/10   12/16/10    AIRTECH HEATING & A/C SYSTEMS INC   
 
09-1386   Reconstruction               0-006-011  05/12/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  10/01/10   10/29/10    PULVER ROOFING CO INC               
                                                            GC-02          -2,200                  12/20/10   01/06/11    PULVER ROOFING CO INC               
 
16-0982   Reconstruction               0-006-012  10/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0260   Reconstruction               0-006-013  02/14/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAFEC-01            0                  10/03/18   11/15/18    RIDLEY ELECTRIC CO INC              
                                                            AAFEC02             0                  11/05/18   01/15/19    RIDLEY ELECTRIC                     
                                                            AAFEC03             0                  11/05/18   01/15/19    RIDLEY ELECTRIC                     
                                                            AAFGC-01            0                  09/10/18   09/19/18    BEEBE CONSTRUCTION                  
                                                            AAFGC-02            0                  10/03/18   10/29/18    WATCHDOG BUILDING PARTNERS LLC      
                                                            AAFRC-01            0                  10/03/18   10/29/18    WATCHDOG BUILDING PARTNERS LLC      
                                                            AAFRC-02            0                  10/03/18   10/29/18    WATCHDOG BUILDING PARTNERS LLC      
                                                            AAFSC101            0                  09/10/18   09/19/18    SMITH SITE DEVOLPMENT               
                                                            AAFSC102            0                  09/10/18   09/19/18    SMITH SITE DEVELOPMENT              
                                                            AAFSC103            0                  11/05/18   01/23/19    SMITH SITE DEVELPMENT LLC           
                                                            AAFSC104            0                  11/05/18   01/24/19    SMITH SITE DEVELOPMENT              
                                                            AAFSC105            0                  01/22/19   02/11/19    SMITH SITE DEVELOPMENT              
                                                            AAFSC106            0                  01/22/19   02/11/19    SMITH SITE DEVELOPMENT              
                                                            AAFSC107            0                  01/22/19   02/11/19    SMITH SITE DEVELOPMENT              
                                                            AAFSC108            0                  09/12/19   09/13/19    SMITH SITE DEVELOPMENT              
                                                            EC-01          17,869                  11/02/18   11/26/18    RIDLEY ELECTRIC COMPANY INC         
                                                            EC-02          28,003                  11/02/18   11/26/18    RIDLEY ELECTRIC COMPANY INC         
                                                            EC-03          32,497                  01/22/19   02/11/19    RIDLEY ELECTRIC COMPANY, INC.       
                                                            EC-04          29,216                  03/27/19   03/27/19    RIDLEY ELECTRIC CO.,INC.            
                                                            EC-05          23,407                  03/27/19   03/27/19    RIDLEY ELECTRIC CO.,INC             
                                                            GC-02           9,370                  10/03/18   10/29/18    BEEBE CONSTRUCTION SERVICES INC     
                                                            GC-04          14,811                  11/05/18   11/15/18    BEEBE CONSTRUCTION SERVICES INC     
                                                            GC-05           1,694                  11/05/18   01/23/19    BEEBE CONSTRUCTION SERVICES INC     
                                                            GC-07           7,952                  01/22/19   02/11/19    BEEBE CONSTRUCTION SERVICE, INC.    
                                                            GC-10          14,041                  03/27/19   04/01/19    beebe construction services, inc.   
                                                            GC-11           3,447                  07/09/19   07/11/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-12           5,508                  07/09/19   07/11/19    BEEBE CONSTRUCTION SERVICES,INC.    
                                                            GC-13           5,309                  09/12/19   09/13/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            RC-01         101,975                  10/03/18   10/29/18    EV ROOFING & CONSTRUCTION SUPPLY COR
                                                            RC-02           7,344                  10/03/18   10/29/18    EV ROOFING CONSTRUCTION SUPPLY CORP 
                                                            RC-03          -2,111                  10/03/18   10/29/18    EV ROOFING & CONSTRUCTION SUPPLY COR
                                                            RC-04           8,160                  01/22/19   02/11/19    EV ROOFING & CONSTRUCTION SUPPLY COR
                                                            SC1-01         -6,581                  10/10/19   10/21/19    SMITH SITE DEVELOPMENT, LLC         
                                                            SC1-02         16,250                  06/12/20   08/04/20    SMITH SITE DEVEOPMENT               
                                                            SC1-03        -24,943                  06/12/20   08/04/20    SMITH SITE DEVEOPMENT               
                                                            SC1-04         20,704                  06/12/20   08/04/20    SMITH SITE DEVELOPMENT              
                                                            SC1-05         36,546                  06/12/20   08/04/20    SMITH SITE DEVELOPMENT              
                                                            SC1-06         25,802                  06/12/20   08/04/20    SMITH SITE DEVELOPMENT              
                                                            SC1-07         -1,994                  06/12/20   08/04/20    SMITH SITE DEVELOPMENT              
 
18-0274   Reconstruction               0-006-014  01/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AA-01R          5,500                  01/18/22   11/01/22    J Priore Const Co                   
                                                            AACS-02             0                  08/29/22   01/09/24    J Prince Const Co                   
                                                            AACS-02             0                  08/22/23     /  /      J.PRIORE CONSTRUCTION               
                                                            AAEC-01             0                  09/12/19   09/16/19    PATRICIA ELECTRIC                   
                                                            AAEC-02             0                  02/06/20   03/06/20    PATRICIA ELECTRIC                   
                                                            AAEC-03             0                  02/06/20   03/06/20    PATRICIA ELECTRIC                   
                                                            AAEC-04             0                  02/06/20   03/06/20    PATRICIA ELECTRIC                   
                                                            AAEC-05             0                  02/06/20   03/06/20    PATRICIA ELECTRIC                   
                                                            AAEC-06             0                  07/16/20   08/31/20    PATRICIA ELECTRIC                   
                                                            AAEC-07             0                  10/15/20   12/29/20    PATRICIA ELECTRIC                   
                                                            AAEC-08             0                  01/08/21   03/10/21    PATRICIA ELECTRIC                   
                                                            AAGC-01             0                  09/12/19   09/13/19    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-02             0                  09/20/19   09/24/19    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-03             0                  10/23/19   10/28/19    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-04             0                  02/06/20   03/16/20    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-05             0                  02/06/20   03/16/20    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-06             0                  02/06/20   03/16/20    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-07             0                  02/14/20   06/02/20    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-08             0                  06/12/20   07/14/20    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-09             0                  07/16/20   09/04/20    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-11             0                  10/15/20   01/06/21    MURNANE BUILDING CONTRACTORS        
                                                            AAGC-12             0                  05/03/21   05/20/21    MURNANE BUILDING CONTRACTORS        
                                                            AAHC-01             0                  09/12/19   09/16/19    H.J. BRANDELES CORP.                
                                                            AAHC-02             0                  02/06/20   03/06/20    H.J. BRANDELES CORP.                
                                                            AAHC-03             0                  06/12/20   07/20/20    H.J. BRANDELES CORP.                
                                                            AAHC-04             0                  06/12/20   07/20/20    H.J. BRANDELES CORP.                
                                                            AAHC-05             0                  10/15/20   12/29/20    H.J. BRANDELES CORP.                
                                                            AAHC-06             0                  01/08/21   03/10/21    H.J. BRANDELES CORP.                
                                                            AAPC-01             0                  10/09/19   10/18/19    H.J. BRANDELES CORP.                
                                                            AAPC-01             0                  02/06/20   03/06/20    H.J. BRANDELES CORP.                
                                                            AAPC-02             0                  02/06/20   03/06/20    H.J. BRANDELES CORP.                
                                                            AAPC-03             0                  02/06/20   03/06/20    H.J. BRANDELES CORP.                
                                                            AAPC-04             0                  02/14/20   03/20/20    H.J. BRANDELES CORP.                
                                                            AAPC-05             0                  06/12/20   07/20/20    H.J. BRANDELES CORP.                
                                                            AAPC-06             0                  01/08/21   06/10/21    H.J. BRANDELES CORP.                
                                                            AASC-01             0                  02/06/20   03/16/20    ROBERT H. LAW, INC.                 
                                                            AASC-02             0                  03/13/20   07/15/20    REOBERT H. LAW, INC.                
                                                            AASC-03             0                  06/12/20   07/14/20    ROBERT H. LAW, INC.                 
                                                            AASC-04             0                  07/16/20   09/04/20    ROBERT H. LAW, INC.                 
                                                            AASC-05             0                  07/16/20   09/04/20    ROBERT H. LAW, INC.                 
                                                            AASC-06             0                  10/15/20   01/06/21    ROBERT H. LAW, INC.                 
                                                            AASC-07             0                  10/15/20   01/06/21    ROBERT H. LAW, INC.                 
                                                            AATB-01             0                  01/18/22   11/01/22    MEID LLC                            
                                                            AATB-03             0                  10/24/22   12/14/23    MEID LLC                            
                                                            AATS-02             0                  08/29/22   08/22/23    MEID LLC                            
                                                            EC-01           3,800                  02/06/20   03/06/20    PATRICIA ELECTRIC                   
                                                            EC-02          16,563                  02/06/20   03/06/20    PATRICIA ELECTRIC                   
                                                            EC-03         -35,382                  06/12/20   07/20/20    PATRICIA ELECTRIC                   
                                                            EC-04           7,386                  07/16/20   08/31/20    PATRICIA ELECTRIC                   
                                                            EC-05          55,782                  10/15/20   12/29/20    PATRICIA ELECTRIC                   
                                                            EC-06           8,207                  01/08/21   03/10/21    PATRICIA ELECTRIC                   
                                                            EC-07           5,624                  02/05/21   03/30/21    PATRICIA ELECTRIC                   
                                                            EC-08           7,000                  03/02/21   04/19/21    PARICIA ELECTRIC                    
                                                            EC-09          22,538                  08/18/21   04/20/22    PATRICIA ELECTRIC                   
                                                            EC-10          18,113                  08/18/21   04/20/22    PATRICIA ELECTRIC                   
                                                            EC-11          31,211                  08/18/21   04/20/22    PATRICIA ELECTRIC                   
                                                            EC-12           4,685                  01/18/22   01/27/23    Patricia Elec                       
                                                            GC-01          -2,573                  09/19/19   09/25/19    MURNANE BUILDING CONTRACTORS        
                                                            GC-02          -8,715                  09/20/19   09/24/19    MURNANE BUILDING CONTRACTORS        
                                                            GC-03          -4,366                  06/12/20   07/14/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-04          -1,027                  06/12/20   07/14/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-05         -14,707                  07/16/20   09/04/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-06          18,797                  07/16/20   09/04/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-07           2,336                  07/16/20   09/04/20    MURNANE BUILDING CONTRACTORS        
                                                            GC-09           5,508                  12/07/20   02/16/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-10          -7,232                  12/07/20   02/16/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-11          -4,853                  12/07/20   02/16/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-12           8,605                  12/07/20   02/16/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-13R         12,964                  01/08/21   06/10/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-14R         24,683                  01/08/21   06/10/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-15R         34,775                  01/08/21   06/10/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-16R          7,286                  01/08/21   06/10/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-17           9,365                  01/14/21   03/29/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-18          -4,044                  02/05/21   03/23/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-19           4,703                  04/06/21   05/17/21    MURNANE BUILDING CONTRACTORS        
                                                            GC-20           1,007                  06/01/21   01/25/22    MUMANE BUILDING COONSTRUCTORS       
                                                            GC-21           1,209                  01/18/22   11/01/22    Murnane Bldg Contrs                 
                                                            GC-22         -20,000                  04/20/22   05/09/23    Murnane Bldg Contrs                 
                                                            HC-01         -43,855                  01/08/21   03/10/21    H.J. BRANDELES CORP.                
                                                            HC-02           7,859                  03/02/21   04/19/21    H.J. BRANDELES CORP.                
                                                            HC-03          28,109                  08/18/21   04/19/22    HJ BRANDELES CORP                   
                                                            HC-04           7,567                  08/18/21   04/19/22    H.J BRANDELES CORP                  
                                                            PC-01          -8,024                  01/08/21   06/10/21    H.J. BRANDELES CORP.                
                                                            PC-02             428                  01/08/21   06/10/21    H.J. BRANDELES CORP.                
                                                            SC-01         -24,551                  09/12/19   09/13/19    ROBERT H. LAW, INC.                 
                                                            SC-01          -3,704                  08/29/22   08/22/23    J Prince Const Co                   
                                                            SC-02         -98,983                  10/10/19   10/21/19    ROBERT H. LAW, INC.                 
                                                            SC-03          21,305                  10/15/20   01/06/21    ROBERT H. LAW, INC.                 
                                                            SC-04          17,644                  10/15/20   01/06/21    ROBERT H. LAW, INC.                 
                                                            SC-05          10,632                  10/15/20   01/06/21    ROBERT H. LAW, INC.                 
                                                            SC-06        -110,000                  10/15/20   01/06/21    ROBERT H. LAW, INC.                 
                                                            SC-07         -25,248                  12/07/20   02/16/21    ROBERT H. LAW, INC.                 
                                                            TB-01          -2,671                  10/24/22   12/14/23    MEID LLC                            
 
19-1773   Reconstruction               0-006-015  07/01/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  11/19/20   02/05/21    CHARLES T. DRISCOLL MASONRY RESTORAT
                                                            GC-02          16,537                  12/07/20   02/24/21    CHARLES T. DRISCOLL MASONRY RESTORAT
                                                            GC-03          30,712                  12/07/20   02/24/21    CHARLES T. DRISCOLL MASONRY RESTORAT
 
02-0621FP Reconstruction               0-006-FP1  12/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          E.A. McAllister Elementary:
90-0606   Additions and Alterations    0-007-002  02/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1217   Reconstruction               0-007-003  03/31/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1239   Additions and Alterations    0-007-004  05/20/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00302C         -4,989                  01/22/03   02/20/03    Bette & Cring                       
                                                            00302C         18,324                  02/07/03   02/20/03    Bette & Cring                       
                                                            00305B          5,513                  01/22/03   02/20/03    Huen New York                       
                                                            00308           1,700                  03/29/04   04/30/04    Tougher Industries                  
                                                            007-0310       -6,521                  01/22/03   02/20/03    Syracuse Mosaic Terazzo             
                                                            047            13,241                  01/22/03   02/20/03    Bette & Cring                       
                                                            048            21,875                  01/22/03   02/20/03    Bette & Cring                       
                                                            053               451                  01/22/03   02/20/03    Bette & Cring                       
                                                            301C-007       -3,293                  01/08/03   03/13/03    Delaney Const.                      
                                                            302C-043        1,479                  01/08/03   02/27/03    Bette & Cring                       
                                                            302C046A       -1,437                  01/08/03   02/27/03    Bette & Cring                       
                                                            305B-002        2,079                  08/27/02   10/28/02    Huen New York                       
                                                            305B-004        1,345                  01/08/03   02/27/03    Huen New York                       
                                                            306C-011       16,000                  01/08/03   02/27/03    Avala Contracting                   
                                                            310-005        -6,811                  08/27/02   10/28/02    Syracuse Mosaic Terazzo             
                                                            42610          -3,248                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -2,079                  08/27/02   10/28/02    Delaney Const.                      
                                                            426610          6,272                  08/30/02   10/21/02    Avala Contracting                   
                                                            426610          9,653                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610         -1,509                  12/17/02   01/13/03    Bellucci Ent.                       
                                                            426610          5,318                  12/17/02   01/13/03    Tougher Industries                  
                                                            426610.         4,217                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         2,079                  08/30/02   10/21/02    Huen New York                       
                                                            426610.        -2,964                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.       -15,179                  08/30/02   10/21/02    Avala Contracting                   
                                                            426610.        -9,046                  08/30/02   10/21/02    Bette & Cring                       
                                                            426610.         2,817                  08/30/02   10/21/02    Delaney Const.                      
 
04-0363   Reconstruction               0-007-005  02/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-06                0                  04/12/06   01/30/07    Hj Brandles Corp                    
                                                            P02                 0                  12/12/05     /  /      Superior Plumbing Heating           
 
07-1176   Reconstruction               0-007-006  08/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-02            7,000                  08/12/09   08/28/09    HUEN NEW YORK INC                   
                                                            E-08              105                  12/03/09   12/15/10    HUEN NEW YORK INC                   
                                                            E-10            1,759                  12/11/09   02/04/10    HUEN NEW YORK INC                   
                                                            E-16              444                  03/19/10   05/26/10    HUEN NEW YORK INC                   
                                                            E-27              335                  10/07/10   11/12/10    HUEN NEW YORK INC                   
                                                            E-31              800                  11/15/10   12/01/10    HUEN NEW YORK INC                   
                                                            GC-01               0                  03/23/09   07/03/09    PARK CITY BUILDERS OF NEW YORK, INC.
                                                            GC-07               0                  06/01/09   08/18/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-24           4,010                  11/13/09   12/30/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-29          -6,923                  12/03/09   12/15/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-37           7,960                  02/18/10   05/10/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            P-02              866                  02/03/10   06/01/10    GIRUZZI PLUMBING & HEATING INC      
 
16-0983   Reconstruction               0-007-007  10/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0261   Reconstruction               0-007-008  01/31/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAFGC-04            0                  10/03/18   10/29/18    WATCHDOG BUILDING PARTNERS LLC      
                                                            AAFSC201            0                  09/10/18   09/19/18    SMITH SITE DEVELOPMENT              
                                                            AAFSC202            0                  10/03/18   10/29/18    WATCHDOG BUILDING PARTNERS LLC      
                                                            AAFSC203            0                  11/05/18   01/23/19    SMITH SITE DEVELOPMENT              
                                                            GC-03             669                  10/03/18   10/29/18    BEEBE CONSTRUCTION SERVICES LLC     
                                                            GC-09           5,348                  01/22/19   02/11/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-14             671                  09/12/19   09/13/19    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-15         -22,700                  10/09/19   10/15/19    BEEBE CONSTRUCTION SERVICES         
 
16-0265   Reconstruction               0-007-009  02/24/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  06/14/17   06/23/17    Northern Floors, LLC                
                                                            GC-02             800                  06/14/17   06/23/17    Northern Floors, LLC                
                                                            GC-03          22,630                  06/14/17   06/23/17    Northern Floors, LLC                
 
16-1895   Reconstruction               0-007-010  06/14/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          Agriculture Marketing Facility:
90-0627   New Construction             0-010-001  01/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Alternative Education Center:
92-0585   New Construction             0-012-001  03/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Agriculture Storage High School:
90-0663   New Construction             2-011-001  09/15/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Building:
07-1178   Reconstruction               3-004-001  08/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-33           6,804                  12/11/09   02/04/10    PARK CITY BUILDERS OF NEW YORK INC  
 

          Bus Garage:
04-0364   Reconstruction               5-003-001  02/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-09                0                  12/12/05   06/26/06    Puterlo Construction                
                                                            RB-01               0                  10/12/05   10/28/05    Pulver Roofing                      
 
07-1177   Reconstruction               5-003-002  08/13/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-005           3,162                  11/13/09   12/30/09    HUEN NEW YORK INC                   
                                                            E-01                0                  05/13/09   07/28/09    HUEN NEW YORK INC                   
                                                            E-09            6,495                  12/11/09   02/04/10    HUEN NEW YORK INC                   
                                                            E-13            1,801                  02/03/10   06/01/10    HUEN NEW YORK INC                   
                                                            E-15          -35,000                  02/03/10   06/01/10    HUEN NEW YORK INC                   
                                                            E-18              224                  03/19/10   05/26/10    HUEN NEW YORK INC                   
                                                            E-25            2,305                  10/06/10   11/12/10    HUEN NEW YORK INC                   
                                                            GC-03               0                  05/13/09   07/30/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-04               0                  06/01/09   08/19/09    PARK CITY BUILDERS OF NEW YORK, INC.
                                                            GC-10               0                  06/22/09   08/14/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-11          13,901                  06/22/09   08/14/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-12          11,673                  08/12/09   09/18/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-13             798                  08/12/09   09/18/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-15           3,372                  09/25/09   10/13/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-23           8,050                  11/13/09   12/30/09    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-27           4,563                  12/03/09   12/15/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-31          28,967                  09/02/11   09/23/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-43           1,245                  08/06/10   11/30/10    PARK CITY BUILDERS OF NEW YORK INC  
                                                            GC-55           3,206                  09/02/11   09/23/11    PARK CITY BUILDERS OF NEW YORK INC  
                                                            P-01            5,435                  02/03/10   06/01/10    GIRUZZI PLUMBING & HEATING INC      
                                                            P-03           -1,699                  02/03/10   06/01/10    GIRUZZI PLUMBING & HEATING INC      
 
16-0984   Reconstruction               5-003-003  10/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          press Box @ Middle/High School:
17-0262   New Construction             7-015-001  02/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Districtwide:
06-1211   Reconstruction               7-999-001  03/28/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-T01          1,575                  08/24/07   09/06/07    RONCO COMMUNICATIONS                
                                                            CO-T02            226                  08/24/07   09/06/07    RONCO COMMUNICATIONS                
 

HOLLAND PATENT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-22-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Gen. Wm. Floyd Elementary:
91-0013   Reconstruction               0-001-002  07/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0847   Additions and Alterations    0-001-003  04/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0011   Reconstruction               0-001-004  08/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0973   Reconstruction               0-001-005  02/10/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0225   Additions and Alterations    0-001-006  12/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA1              -800                  10/08/03   10/13/06    Midlantic Environ.                  
                                                            E-16              742                  10/18/04   12/21/04    Panko Elec.                         
                                                            E-18            1,006                  11/12/04   12/06/04    Panko Elec.                         
                                                            E1                  0                  05/07/02   05/23/02    Panko Elec.                         
                                                            E2                 21                  03/24/03   04/21/03    Panko Elec.                         
                                                            E7            -17,197                  04/17/03   05/05/03    Panko Elec.                         
                                                            GC-1                0                  04/03/03   04/17/03    GR Grates Const.                    
                                                            GC-2                0                  04/03/03   04/17/03    GR Grates Const.                    
                                                            HV-10           1,958                  03/29/04   04/28/04    Scharf Plumbing                     
                                                            HV-7           -3,302                  11/26/03   01/08/04    Scharf Plumbing                     
                                                            HV1             6,304                  06/17/02   08/15/02    Scharf Plumbing                     
                                                            HV2                 0                  03/24/03   04/21/03    Scharf Plumbing                     
                                                            P-2            -3,276                  11/26/03   12/07/05    Scharf Plumbing                     
                                                            P-9             6,979                  01/21/05   03/16/05    Scharf Plumbing heating             
                                                            P1                  0                  12/12/01   04/05/02    Scharf Plumbing                     
                                                            R1               -864                  12/12/01   04/05/02    Pulver Roofing                      
                                                            RGC-1          -6,841                  03/29/04   04/06/04    HR Beebe                            
                                                            RGC-10         11,523                  03/29/04   04/06/04    HR Beebe                            
                                                            RGC-12          7,484                  03/29/04   04/06/04    HR Beebe                            
                                                            RGC-13         15,660                  07/20/04   07/27/04    HR Beebe                            
                                                            RGC-14        -60,727                  07/20/04   07/27/04    HR Beebe                            
                                                            RGC-15         14,261                  07/20/04   07/27/04    HR Beebe                            
                                                            RGC-2           2,090                  03/29/04   04/06/04    HR Beebe                            
                                                            RGC-24        -15,410                  05/16/05   07/13/05    HR Beebe Inc                        
 
98-1641   Reconstruction               0-001-007  10/25/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4          -10,040                  01/22/02   03/04/02    Murnane Bldg. Contractors           
 
04-0866   Reconstruction               0-001-008  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            04-02               0                  01/26/06   06/09/06    George Nole and Sons                
                                                            08-01          12,385                  02/22/06   06/07/06    North Country Flooring              
                                                            08-03               0                  07/27/06   08/25/06    North County Flooring               
 
07-1244   Reconstruction               0-001-009  07/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA#07-07            0                  11/13/09   02/08/10    RIDLEY ELECTRIC CO INC              
 
09-0920   Reconstruction               0-001-010  05/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-H-02             0                  09/28/10   10/28/10    GIRUZZI PLUMBING & HEATING INC      
                                                            E-01            1,744                  08/18/10   09/24/10    EPPY ELECTRIC LLC                   
                                                            E-02            5,198                  09/13/10   09/29/10    EPPY ELECTRIC LLC                   
                                                            E-03             -270                  11/24/10   12/08/10    EPPY ELECTRIC LLC                   
                                                            S-01                0                  08/18/10   09/24/10    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            S-02          116,339                  09/13/10   09/28/10    BOLAND'S EXCAVATING & TOPSOIL INC   
 
10-0933   Reconstruction               0-001-011  06/09/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          19,671                  11/30/11   02/13/12    RIDLEY ELECTRIC COMPANY INC         
                                                            E-002          -1,462                  12/22/11   08/06/12    RIDLEY ELECTRIC COMPANY INC         
                                                            E-003         -10,000                  01/19/12   03/30/12    RIDLEY ELECTRIC COMPANY INC         
                                                            E-004           1,929                  05/25/12   09/28/12    RIDLEY ELECTRIC COMPANY INC         
                                                            GC-01            -335                  12/22/11   08/07/12    RICHARD E ALEXANDER CO INC          
                                                            GC-02          -1,302                  12/22/11   08/07/12    RICHARD E ALEXANDER CO INC          
                                                            GC-03          -1,504                  01/19/12   04/06/12    RICHARD E ALEXANDER CO INC          
                                                            GC-04         -10,000                  01/19/12   04/06/12    RICHARD E ALEXANDER CO INC          
 
12-0345   Reconstruction               0-001-013  09/09/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-01          12,025                  09/08/14   10/03/14    Bronze Contracting, LLC             
 
14-0582   Reconstruction               0-001-014  07/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC02-18        11,224                  02/03/17   07/14/17    Richard E. Alexander Co., Inc.      
                                                            GC02-19        23,429                  02/03/17   07/14/17    Richard E. Alexander Co., Inc.      
                                                            RC03B-01      -14,135                  07/25/16   09/30/16    EV Roofing Corporation              
                                                            RCO3B-02      -10,000                  10/03/16   10/31/16    EV Roofing Corporation              
 
19-1194   Reconstruction               0-001-015  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  09/07/21   05/24/22    PATRICIA ELECTRIC, INC              
                                                            EC-02           1,142                  10/22/21   12/06/22    Patrica Electric Inc.               
                                                            GC-04               0                  07/08/21   12/21/21    RE Alexander Co Inc                 
                                                            GC-05               0                  07/08/21   12/21/21    RE Alexander Co. Inc                
                                                            GC-06               0                  07/21/21   12/21/21    R.E. Alexander Co.Inc.              
                                                            GC-07               0                  07/21/21   12/21/21    RE Alexander Co Inc                 
                                                            GC-08               0                  09/07/21   05/24/22    R.E. ALEXANDER CO INC               
                                                            GC-11          26,021                  12/21/21   01/24/23    RE Alexander Co. Inc.               
                                                            GC-12          26,021                  12/22/21   01/24/23    R.E. ALEXANDER                      
                                                            GC01-01             0                  02/16/21   04/28/21    R.E. ALEXANDER CO., INC.            
                                                            GC01-02             0                  02/16/21   04/28/21    R.E. ALEXANDER CO., INC.            
                                                            GC01-03             0                  02/16/21   04/28/21    R.E. ALEXANDER CO., INC.            
                                                            MC-01               0                  09/07/21   05/24/22    SCHMALZ MECHANICAL CONTRACTORS      
                                                            MC-02           6,240                  10/22/21   12/06/22    Schmalz Mech Contractors            
                                                            MC-03          19,205                  10/22/21   12/06/22    Schmalz Mech Contractors            
                                                            PC-01               0                  03/26/21   05/12/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-02               0                  03/26/21   05/12/21    ERIE MECHANICAL CONTRACTORS, INC.   
                                                            PC-03               0                  10/22/21   12/06/22    Erie Mech Contractors, Inc          
                                                            PC-04          -4,061                  10/22/21   12/06/22    Erie mecgh Contractors, Inc         
 
19-1441   Reconstruction               0-001-016  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAC-01              0                  07/21/21   12/14/21    DSA Services Inc                    
                                                            AAC-02              0                  01/13/22   12/29/22    DSA Services Inc                    
                                                            EC-01               0                  01/28/22   01/25/23    SC Spencer Elec Inc                 
                                                            EC-02          -2,037                  01/28/22   01/25/23    SC Spencer Elec Inc                 
                                                            EC-04               0                  01/28/22   01/25/23    SC Spencer Elec Inc                 
                                                            EC-05               0                  01/28/22   01/25/23    SC Spencer Elec Inc                 
                                                            EC-07            -996                  01/28/22   01/25/23    SC Spencer Elec Inc                 
                                                            GC-01               0                  07/21/21   12/30/21    Richard Alexander CO Inc            
                                                            GC-03               0                  07/21/21   01/04/22    Richard Alexander Co Inc            
                                                            GC-10               0                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-11               0                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-16           6,726                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-18           9,603                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-19           2,062                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            HVAC05-2      -39,540                  07/25/22   05/09/23    HJ Brandeles Corp                   
                                                            PC-04               0                  07/25/22   05/09/23    HJ Brandeles Corp                   
 
19-1632   Reconstruction               0-001-017  05/29/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          17,850                  02/05/21   04/28/21    R.E. ALEXANDER CO., INC.            
                                                            GC-02               0                  02/02/21   04/28/21    R.E. ALEXANDER CO., INC.            
                                                            GC-03          -2,149                  03/16/21   05/06/21    R.E. ALEXANDER CO., INC.            
 
19-0586   Reconstruction               0-001-018  02/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-01             0                  10/29/20   01/11/21    H.J. BRANDELES CORP.                
                                                            HVAC-06         1,761                  12/21/20   03/12/21    H.J. BRANDELES CORP.                
                                                            PC-01          -5,000                  11/16/20   02/12/21    H.J. BRANDELES CORP.                
                                                            PC-02            -300                  12/21/20   03/12/21    DELES CORP.                         
                                                            RC-04          -2,961                  10/29/20   02/09/21    J&B INSTALLATIONS, INC.             
                                                            RC-06         -29,397                  11/03/21   08/25/22    J&B installations, Inc              
 

          Middle School:
92-0848   Reconstruction               0-003-004  04/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0012   Reconstruction               0-003-005  08/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0226   Reconstruction               0-003-007  12/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA1             1,500                  10/08/03   10/23/03    Midlantic Environ.                  
                                                            E-13              619                  03/29/04   04/28/04    Panko Elec.                         
                                                            E-15            2,112                  03/29/04   04/28/04    Panko Elec.                         
                                                            E-8               144                  06/19/03   07/11/03    Panko Elec.                         
                                                            E3             23,808                  03/24/03   04/21/03    Panko Elec.                         
                                                            GC-3           10,131                  04/03/03   04/17/03    GR Grates Const.                    
                                                            GC-4                0                  04/03/03   04/17/03    GR Grates Const.                    
                                                            GC-6                0                  04/03/03   04/17/03    GR Grates Const.                    
                                                            HV-5                0                  11/26/03   01/08/04    Scharf Plumbing                     
                                                            HV-6                0                  11/26/03   01/08/04    Scharf Plumbing                     
                                                            HV-8           40,488                  11/26/03   01/19/06    Scharf Plumbing                     
                                                            HV-9            4,475                  03/29/04   04/28/04    Scharf Plumbing                     
                                                            HV4                 0                  03/24/03   04/21/03    Scharf Plumbing                     
                                                            P-4             2,944                  03/29/04   04/28/04    Scharf Plumbing                     
                                                            P-7             5,513                  01/21/05   03/16/05    Scharf Plumbing Heating             
                                                            R2             -3,051                  11/26/03   12/26/03    Pulver Roofing                      
                                                            RGC-11            866                  03/29/04   04/06/04    HR Beebe                            
                                                            RGC-16         18,254                  07/20/04   07/27/04    HR Beebe                            
                                                            RGC-19          1,903                  07/20/04   07/27/04    HR Beebe                            
                                                            RGC-22            690                  10/18/04   12/21/04    HR Beebe                            
                                                            RGC-3          12,876                  03/29/04   04/06/04    HR Beebe                            
                                                            RGC-4           6,333                  03/29/04   04/06/04    HR Beebe                            
                                                            RGC-8           1,547                  03/29/04   04/06/04    HR Beebe                            
 
98-1642   Reconstruction               0-003-008  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0867   Additions and Alterations    0-003-009  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            01-01          27,000                  03/07/06   06/23/06    Two Brothers Contracting            
                                                            01-01          19,665                  06/18/07   07/17/07    Two Brothers Contracting            
                                                            01-02          28,193                  01/26/06   07/14/06    Two Brothers Contracting            
                                                            01-03         -14,435                  02/22/06   06/23/06    Two Brothers Contracting            
                                                            01-04          46,868                  07/13/06   10/12/06    Two brother Contracting             
                                                            01-07          -1,552                  02/20/07   03/09/07    Two Brothers Contracting            
                                                            01-08          -3,000                  02/20/07   03/09/07    Two Brothers Contracting            
                                                            03-01          -1,301                  11/18/05   12/06/05    RITTER & PARATORE CONTRACTING       
                                                            03-02           9,175                  06/07/06   06/23/06    Ritter And Paratore Contracting     
                                                            03-03           3,366                  02/22/06   06/07/06    HR Beebe Incorp                     
                                                            03-03          -2,632                  07/27/06   08/25/06    Ritter and Paratore                 
                                                            03-04           2,031                  02/22/06   06/07/06    Hr Beebe Incorp                     
                                                            03-05           8,572                  05/04/06   06/07/06    Ritter and Paratore Construction    
                                                            03-06             737                  02/22/06   06/07/06    Hr Beebe Incorp                     
                                                            03-07           2,195                  05/22/06   07/21/06    Ritter Paratore Construction        
                                                            03-08             952                  07/18/06   08/14/06    Ritter paratore Construction        
                                                            04-01           6,212                  06/07/06   06/23/06    George Nole and Sons                
                                                            04-01C          2,992                  05/04/06   06/07/06    George nole Construction            
                                                            04-01L            896                  06/18/07   07/17/07    Nole Construction                   
                                                            04-02          -4,093                  06/07/06   06/23/06    George nole and Son                 
                                                            04-03          12,135                  02/22/06   06/07/06    George Nole and Sons                
                                                            04-03           3,330                  11/10/06   12/28/06    George Nole                         
                                                            04-05           3,795                  02/22/06   06/07/06    George Nole and sons                
                                                            04-06           9,281                  02/22/06   06/07/06    George Nole and Sons                
                                                            04-07           1,540                  04/05/06   08/08/06    George nole and Sons                
                                                            05-01          11,751                  12/01/05   12/06/05    PUTRELO CONSTRUCTION                
                                                            05-01          16,992                  01/26/06   07/24/06    Puterlo Construction                
                                                            05-02           2,344                  02/22/06   06/07/06    Puterlo Construction                
                                                            05-02           3,822                  04/07/06   06/23/06    Puterlo Construction                
                                                            05-03           5,406                  02/22/06   06/07/06    Puterlo Construction                
                                                            05-04           4,722                  02/22/06   06/07/06    Puterlo Construction                
                                                            05-05           4,559                  02/22/06   06/07/06    Puterlo Construction                
                                                            05-06             279                  02/22/06   06/07/06    Puterlo Construction                
                                                            05-07             300                  05/04/06   06/07/06    Puterlo Construction                
                                                            06-01          -1,959                  02/22/06   07/24/06    EV Roofing                          
                                                            07-01           1,084                  02/22/06   06/07/06    Hr Beebe Incorp                     
                                                            07-01          -1,948                  07/13/06   08/14/06    Utica Glass Co                      
                                                            07-02           1,968                  05/04/06   06/07/06    Utica Glass Co                      
                                                            08-01           3,770                  02/22/06   08/08/06    Hr Beebe Incorp                     
                                                            08-02          -1,630                  06/07/06   06/23/06    North Country Flooring              
                                                            09-01           2,450                  12/01/05   12/06/05    DICK TILE & MARIBLE COMPANY         
                                                            09-01          16,000                  07/27/06   08/25/06    Dick Tile Marble                    
                                                            09-02           7,550                  07/18/06   08/14/06    dick Tile and Marble Co             
                                                            09-02             300                  01/11/07   02/21/07    Dick Tile and Marble                
                                                            10-01           1,400                  02/22/06   06/07/06    Nickerson Corp                      
                                                            10-01           1,225                  06/07/06   06/23/06    Nickerson Corp                      
                                                            11-01           6,498                  12/01/05   12/06/05    J.J. BRANDELES CORPORATION          
                                                            11-01          -2,819                  06/07/06   09/29/06    HJ brandeles                        
                                                            11-02             683                  11/22/06   04/20/06    Hj brandeles                        
                                                            12-01           9,509                  02/22/06   04/20/06    Hj brandeles                        
                                                            12-01          -3,200                  01/25/07   08/07/07    HJ Brandeles                        
                                                            12-02           5,718                  02/22/06   04/20/06    Hj Brandeles                        
                                                            12-02           4,841                  01/25/07   08/07/07    HJ Brandeles                        
                                                            12-03            -750                  02/20/07   03/09/07    HJ Brandeles                        
                                                            12-04           1,353                  02/22/06   04/20/06    HJ Brandeles Inc                    
                                                            12-05             219                  05/04/06   10/30/06    HJ Brandeles Inc                    
                                                            12-06           2,555                  09/07/06   10/30/06    HJ Brandeles Inc                    
                                                            13-01          11,108                  12/01/05   12/06/05    MADONIA ELECTTRIC, INC.             
                                                            13-01          -2,627                  07/13/06   10/12/06    Madonia Electric                    
                                                            13-02           6,393                  04/05/06   10/23/07    Madonia Electric                    
                                                            13-03           1,664                  05/04/06   10/30/06    Madonia Electric                    
                                                            13-04           3,206                  05/12/06   11/22/06    Madonia Electric                    
 
05-1200   Reconstruction               0-003-011  04/25/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-03          15,366                  01/25/07   03/14/07    Richard Alexander                   
                                                            02-01           1,491                  11/30/06   01/09/07    HJ Brandles                         
                                                            03-02           2,320                  11/30/06   01/09/07    HJ Brandles Corp                    
                                                            04-01           5,000                  11/30/06   01/09/07    Advanced Power Light                
 
07-1245   Reconstruction               0-003-012  07/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            07-01            -792                  12/16/09   01/21/10    RIDLEY ELECTRIC CO INC              
                                                            AA#02-13            0                  07/31/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-13       -1,373                  09/10/09     /  /      MURNANE BUILDING CONTRACTORS        
                                                            AA#02-16            0                  09/25/09   10/08/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-18            0                  09/10/09   09/25/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#05-05          925                  11/13/09   02/08/10    H.J. BRANDELES CORPORATION          
                                                            AA#06-08           96                  11/13/09   02/08/10    H.J. BRANDELES CORPORATION          
                                                            AA#06-09          214                  11/13/09   02/08/10    H.J. BRANDELES CORPORATION          
 
12-0346   Reconstruction               0-003-013  09/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0583   Reconstruction               0-003-014  07/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC06-03             0                  05/31/16     /  /      SC SPENCER ELECTRIC                 
                                                            GC-02-02       25,398                  07/20/18   08/01/18    PRIORE CONSTRUCTION                 
                                                            GC02-01             0                  03/18/16   03/23/16    Richard E Alexander Co. Inc.        
                                                            GC02-02        25,398                  07/12/19     /  /      PRIORE CONSTRUCTION                 
                                                            GC02-05             0                  05/31/16   06/07/16    RICHARD E ALEXANDER CO              
                                                            GC02-11           190                  11/30/16   12/09/16    Alexander Co, Inc.                  
                                                            PL-04-01            0                  09/06/18   09/12/18    SCHMALZ MECHANICAL CONTRACTORS      
                                                            SC01-02             0                  05/31/16   06/07/16    CENTRAL NEW YORK CONSTRUCTION       
                                                            SC01-03         7,699                  05/31/16   06/07/16    CENTRAL NEW YORK CONSTRUCTION       
                                                            SC01-06         6,957                  07/25/16   09/30/16    Central New York Construction       
                                                            SC01-07        12,231                  07/25/16   09/30/16    Central New York Construction       
                                                            TC07-01             0                  04/07/16   12/28/16    Syracuse Scenery & Stage Lighting   
                                                            TC07-02         3,345                  05/31/16   06/07/16    SYRACUSE SCENERY                    
 
16-0643   Reconstruction               0-003-015  09/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC02-02        25,398                  11/05/19   11/08/19    PRIORE CPNSTRUCTION                 
                                                            GC02-07         2,455                  11/07/18   01/09/19    PRIORE CONSTRUCTION                 
                                                            GC02-08           671                  01/22/19   02/25/19    PRIORE CONSTRUCTION                 
                                                            HVAC0303       -3,212                  01/22/19   02/13/19    SCHMALZ MECHANICAL CONTRACTORS      
                                                            PLBG0401            0                  11/05/19   11/08/19    SCHMALZ MECHANICAL CONTRACTORS      
                                                            PLBG0403        2,020                  12/13/18   01/28/19    SCHMALZ MECHANICAL CONTRACTORS      
 
18-1837   Reconstruction               0-003-016  05/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -5,010                  06/10/20   08/04/20    MIDLANTIC ENVIROMENTAL, INC.        
 
19-1442   Reconstruction               0-003-017  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-22           5,618                  03/01/23   09/26/23    Richard Alexander Co Inc            
 
19-0587   Reconstruction               0-003-018  02/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  11/16/20   02/12/21    J&A ELECTRICAL CONSTRUCTION, LLC    
                                                            HVAC-04         4,243                  12/21/20   03/12/21    H.J. BRANDELES CORP.                
                                                            HVAC-05         2,782                  02/05/21   03/30/21    H.J. BRANDELES CORP.                
                                                            HVAC-07         1,702                  12/21/20   03/12/21    H.J. BRANDELES CORP.                
                                                            RC-01          -4,521                  10/29/20   02/09/21    J&B INSTALLATIONS, INC.             
                                                            RC-02               0                  10/29/20   02/09/21    J&B INSTALLATIONS, INC.             
 
02-1619FP Reconstruction               0-003-FP1  05/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Garage and Shop:
92-0849   Reconstruction               0-004-002  04/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0013   Reconstruction               0-004-003  08/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0227   Reconstruction               0-004-005  12/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RGC-5           1,073                  03/29/04   04/26/04    HR Beebe Inc                        
                                                            RGC7            4,552                  03/29/04   04/07/04    HR Beebe Inc                        
 
98-1643   Reconstruction               0-004-006  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0868   Reconstruction               0-004-007  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-05           6,800                  10/18/06   11/03/06    Two Brothers Contracting            
 
03-1573   Reconstruction               0-004-008  05/26/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          -23,261                  01/19/05   03/16/05    HR Beebe Inc                        
 
12-0347   Reconstruction               0-004-009  09/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1443   Reconstruction               0-004-011  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-02          46,972                  01/28/22   02/01/23    LaValley Bros Const                 
                                                            03-03          43,944                  01/28/22   02/01/23    LaValley Bros Const                 
                                                            EC-03               0                  01/28/22   01/25/23    SC Spencer Elec Inc                 
                                                            GC-02               0                  07/21/21   12/30/21    Richard Alexander Co Inc            
 

          Holland Patent Elementary:
92-0850   Reconstruction               0-005-002  04/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0015   Additions and Alterations    0-005-003  08/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1033   Reconstruction               0-005-004  04/03/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0228   Reconstruction               0-005-006  12/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA1             2,800                  10/08/03   10/13/06    Midlantic Environ.                  
                                                            E-17              181                  10/18/04   12/21/04    Panko Elec.                         
                                                            GC-5                0                  04/03/03   04/17/03    GR Grates Const.                    
                                                            HV-11           1,957                  03/29/04   04/26/04    Scharf Plumbing                     
                                                            HV3                 0                  03/24/03   04/21/03    Scharf Plumbing                     
                                                            P-3               760                  11/26/03   11/29/05    Scharf Plumbing                     
                                                            P-6             1,902                  01/21/05   03/16/05    Scharf Plumbing heating Inc         
                                                            RGC-17          1,838                  07/20/04   07/27/04    HR Beebe                            
                                                            RGC-20            108                  10/18/04   12/21/04    HR Beebe                            
                                                            RGC6           15,524                  03/31/04   04/07/04    HR Beebe                            
 
04-0869   Additions and Alterations    0-005-007  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-06           4,234                  10/18/06   11/03/06    Two brothers Contracting            
                                                            02-01         -36,340                  03/07/06   06/07/06    Bojan Development                   
 
05-1201   Reconstruction               0-005-008  04/24/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01           3,000                  09/07/06   10/30/06    Richard ALexander                   
                                                            01-01           6,406                  03/19/07   04/03/07    Richard Alexander                   
                                                            01-02           1,095                  09/19/06   10/30/06    Richard Alexander                   
                                                            01-04             536                  01/25/07   03/14/07    Richard Alexander Co                
                                                            02-01          -3,249                  01/11/07   01/23/07    HJ Brandeles                        
                                                            02-02             260                  11/30/06   01/09/07    HJ brandeles                        
                                                            03-01          -4,309                  11/10/06   03/15/07    HJ Brandeles                        
                                                            03-02           2,320                  11/30/06   01/09/07    HJ Brandeles Corp                   
                                                            03-02          -2,148                  01/11/07   02/09/07    HJ Brandeles                        
                                                            04-01           1,189                  11/10/06   03/15/07    Advanced Power Light                
                                                            04-01           5,000                  11/30/06   01/09/07    Advanced Power and Light            
                                                            04-02             711                  01/11/07   01/24/07    Advanced Power Light                
 
07-1246   Additions and Alterations    0-005-009  07/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-01        -134,369                  09/23/10   10/06/10    MURNANE BUILDING CONTRACTORS        
                                                            02-02         -29,928                  09/10/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            02-03          -5,049                  12/16/09   01/21/10    MURNANE BUILDING CONTRACTORS        
                                                            02-04         -41,570                  12/16/09   01/21/10    MURNANE BUILDING CONTRACTORS        
                                                            02-07               0                  02/18/10   04/02/10    MURNANE BUILDING CONTRACTORS        
                                                            02-08               0                  02/22/11   03/11/11    MURNANE BUILDING CONTRACTORS        
                                                            03-01          -3,908                  09/20/10   11/19/10    PTL CONTRACTING CORPORATION         
                                                            04-01          -2,500                  12/16/09   01/21/10    FORTH SPORT FLOORS INC              
                                                            04-02          -3,932                  05/07/12   09/14/12    FORTH SPORTS FLOORS INC             
                                                            05-01         -49,346                  12/16/09   01/21/10    H.J. BRANDELES CORP                 
                                                            06-01            -701                  12/16/09   01/21/10    H.J. BRANDELES CORP                 
                                                            06-02         -52,256                  12/16/09   01/21/10    H.J. BRANDELES CORP                 
                                                            07-02         -17,315                  12/16/09   01/21/10    RIDLEY ELECTRIC CO INC              
                                                            A#07-01U       -4,632                  11/13/09   02/08/10    RIDLEY ELECTRIC CO INC              
                                                            AA#02-05            0                  05/19/09   08/06/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-08        3,237                  06/30/09   08/06/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-10        3,694                  07/21/09   08/10/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-14            0                  07/31/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-14            0                  09/10/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-17            0                  09/10/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-19            0                  09/10/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#03-01       -1,091                  11/13/09   02/08/10    PTL CONTRACTING CORP                
                                                            AA#05-02            0                  07/31/09   10/09/09    HJ BRANDELES CORPORATION            
                                                            AA#05-03         -693                  11/13/09   02/08/10    H.J. BRANDELES CORPORATION          
                                                            AA#06-06            0                  07/31/09   10/09/09    HJ BRANDELES CORPORATION            
                                                            AA#07-05            0                  09/10/09   09/25/09    RIDLEY ELECTRIC CO INC              
                                                            AA#07-06       -2,472                  11/13/09   02/08/10    RIDLEY ELECTRIC CO INC              
                                                            AA#07-08         -591                  11/13/09   02/08/10    RIDLEY ELECTRIC CO INC              
 
12-0348   Reconstruction               0-005-011  09/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0594   Reconstruction               0-005-012  01/07/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC1-01        -28,000                  08/31/15   09/03/15    EV Roofing                          
                                                            RC1-02         28,000                  08/31/15   09/03/15    EV Roofing                          
                                                            RC1-03              0                  08/31/15   09/03/15    EV Roofing                          
                                                            RC1-04           -970                  10/19/15   11/19/15    EV Roofing                          
 
14-0584   Reconstruction               0-005-013  07/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            05-02             836                  10/03/16   11/01/16    H.J. Brandeles Corporation          
                                                            EC06-09        -1,095                  10/03/16   11/01/16    SC Spencer Electric, Inc.           
                                                            EC06-10        -2,130                  10/03/16   11/01/16    SC Spencer Electric, Inc.           
                                                            SC01-04        34,999                  07/25/16   09/30/16    Central New York Construction       
                                                            SC01-08        29,870                  10/03/16   11/01/16    Central New York Construction       
                                                            SC01-12        18,129                  10/03/16   11/01/16    Central New York Construction       
                                                            SC01-13        28,320                  10/03/16   11/01/16    Central New York Construction       
                                                            SC01-14        14,282                  10/03/16   10/31/16    Central New York Construction       
                                                            SC01-15           472                  10/24/16   11/02/16    Central New York Construction       
 
19-1444   Reconstruction               0-005-014  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-07          -3,122                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-08          -9,970                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-12               0                  08/15/22   09/26/23    Richard Alexander Co Inc            
 
02-1618FP Reconstruction               0-005-FP1  05/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
95-0014   Reconstruction               0-008-005  08/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0661   Additions and Alterations    0-008-006  02/10/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0229   Reconstruction               0-008-007  12/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-10            7,968                  01/15/04   01/29/04    Panko Elec.                         
                                                            E-11            8,224                  03/29/04   04/28/04    Panko Elec.                         
                                                            E-14           -7,810                  03/29/04   04/28/04    Panko Elec.                         
                                                            E-19            3,110                  01/21/05   03/16/05    Panko electrical Maintenance Inc    
                                                            E-20              -57                  01/21/05   03/16/05    Panko Electrical Maintenance Inc    
                                                            E-9             1,579                  11/26/03   01/08/04    Panko Elec.                         
                                                            E4             -9,972                  03/24/03   04/21/03    Panko Elec.                         
                                                            HV-12           3,889                  11/26/04   03/21/05    Scharf Plumbing                     
                                                            HV-13            -662                  11/26/04   03/21/05    Scharf Plumbing                     
                                                            HV-14          -1,957                  01/21/05   03/16/05    Scharf Plumbing Heating             
                                                            P-5            -5,397                  03/29/04   04/28/04    Scharf Plumbing                     
                                                            P-8             3,005                  01/21/05   03/16/05    Scharf Plumbing heating             
                                                            R-3            -1,500                  11/26/03   12/26/03    Pulver Roofing                      
                                                            RGC-1          -6,841                  03/29/04   10/13/06    HR Beebe                            
                                                            RGC-10         11,523                  03/29/04   10/13/06    HR Beebe                            
                                                            RGC-12          7,484                  03/29/04   10/13/06    HR Beebe                            
                                                            RGC-18            923                  07/20/04   07/27/04    HR Beebe                            
                                                            RGC-21            550                  10/18/04   12/21/04    HR Beebe                            
                                                            RGC-23         -1,148                  05/16/05   07/13/05    HR Beebe Inc                        
 
98-1644   Reconstruction               0-008-008  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0870   Additions and Alterations    0-008-009  03/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            12-03             805                  02/22/06   04/20/06    HJ Brandeles                        
 
07-1247   Reconstruction               0-008-010  07/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01         -68,950                  12/16/09   01/21/10    midlantic environmental inc         
                                                            02-01           3,806                  03/19/09   05/27/09    MURNANE BUILDING CONTRACTORS        
                                                            02-05           2,988                  12/24/09   02/05/10    MURNANE BUILDING CONTRACTORS        
                                                            02-06               0                  02/18/10   04/02/10    MURNANE BUILDING CONTRACTORS        
                                                            02-09               0                  02/22/11   03/11/11    MURNANE BUILDING CONTRACTORS        
                                                            07-01           1,434                  03/19/09   04/02/09    RIDKLEY ELECTRIC CO. INC.           
                                                            08-01          -5,460                  12/11/09   01/21/10    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-02            0                  04/30/09   07/21/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-03            0                  04/30/09   07/21/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-04            0                  04/30/09   07/21/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-06            0                  05/19/09   08/06/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-07            0                  07/21/09   08/10/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-09        7,914                  07/21/09   08/10/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-11            0                  07/31/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-11            0                  09/10/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-12            0                  07/31/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-12            0                  09/10/09   10/09/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#02-15            0                  09/25/09   10/08/09    MURNANE BUILDING CONTRACTORS        
                                                            AA#05-01            0                  07/31/09   10/09/09    HJ BRANDELES CORPORATION            
                                                            AA#05-04         -901                  11/13/09   02/08/10    H.J. BRANDELES CORPORATION          
                                                            AA#06-01            0                  04/30/09   01/18/12    H.J. BRANDELES CORPORATION          
                                                            AA#06-02            0                  04/30/09   01/18/12    H.J. BRANDELES CORPORATION          
                                                            AA#06-03            0                  05/19/09   08/14/09    H.J. BRANDELES CORPORATION          
                                                            AA#06-04        2,062                  06/30/09   08/06/09    H.J. BRANDELES CORPORATION          
                                                            AA#06-05            0                  07/31/09   10/09/09    HJ BRANDELES CORPORATION            
                                                            AA#06-07            0                  09/10/09   10/09/09    H.J. BRANDELES CORPORATION          
                                                            AA#07-03        8,238                  06/30/09   08/14/09    RIDLEY ELECTRIC CO INC              
                                                            AA#07-04            0                  09/10/09   10/09/09    RIDLEY ELECTRIC CO INC              
 
11-0200   Reconstruction               0-008-011  05/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-01            2,363                  11/30/11   02/23/12    EV ROOFING & CONSTRUCTION SUPPLY    
                                                            R-02           -9,636                  01/19/12   05/29/12    EV ROOFING & CONSTRUCTION SUPPLY    
 
12-0349   Reconstruction               0-008-012  09/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0585   Reconstruction               0-008-013  07/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03A-01        -36,200                  10/03/16   10/31/16    PTL Roofing Corporation             
                                                            03A-02              0                  10/03/16   10/31/16    PTL Roofing Corporation             
                                                            03A-03         -2,990                  10/03/16   10/31/16    PTL Roofing Corporation             
                                                            05-01               0                  09/12/16   11/16/16    H.J. Brandeles Corporation          
                                                            05-03           1,130                  01/13/17   01/20/17    H.J. Brandeles                      
                                                            EC06-02             0                  05/06/16   05/19/16    SC Spencer Electric, Inc            
                                                            EC06-05             0                  06/24/16   07/08/16    SP Spencer Electric, Inc.           
                                                            EC06-06           329                  09/26/16   10/27/16    SC Spencer Electric, Inc.           
                                                            EC06-07         6,438                  10/03/16   10/31/16    SC Spencer Electric, Inc.           
                                                            EC06-08         2,179                  10/03/16   10/31/16    SC Spencer Electric, Inc.           
                                                            EC06-11        13,050                  10/03/16   10/31/16    SC Spencer Electric, Inc.           
                                                            EC06-12        29,550                  10/03/16   10/31/16    SC Spencer Electric, Inc.           
                                                            EC06-13        -3,997                  10/24/16   12/16/16    SC Spencer Electric, Inc.           
                                                            EC06-14           995                  10/24/16   12/16/16    SC Spencer Electric, Inc.           
                                                            EC06-15         2,346                  12/01/16   01/06/17    SC Spencer Electric, Inc.           
                                                            ECO6-16         1,658                  12/27/16   01/06/17    SC Spencer Electric, Inc.           
                                                            GC02-02             0                  03/18/16   03/23/16    Richard E Alexander Co. Inc.        
                                                            GC02-03          -938                  03/18/16   03/23/16    Richard E Alexander Co. Inc.        
                                                            GC02-04             0                  05/06/16   05/19/16    RICHARD E ALEXANDER                 
                                                            GC02-06             0                  07/25/16   09/30/16    Richard E. Alexander Co., Inc.      
                                                            GC02-07             0                  10/03/16   10/31/16    Richard E. Alexander Co., Inc.      
                                                            GC02-08        13,754                  10/03/16   10/31/16    Richard E. Alexander Co., Inc.      
                                                            GC02-09        19,252                  10/03/16   10/31/16    Richard E. Alexander Co., Inc.      
                                                            GC02-10        25,198                  10/03/16   10/31/16    Richard E. Alexander Co., Inc.      
                                                            GC02-12         2,037                  10/24/16   12/16/16    Alexander Co., Inc.                 
                                                            GC02-13         1,409                  10/24/16   12/16/16    Alexander Co., Inc.                 
                                                            GC02-14             0                  10/24/16   11/02/16    Richard E. Alexander, Inc.          
                                                            GC02-15        72,272                  10/24/16   11/02/16    Richard E. Alexander Co., Inc.      
                                                            GC02-16          -839                  12/01/16   12/09/16    Alexander Co., Inc.                 
                                                            GC02-17        21,910                  12/27/16   01/13/17    RE Alexander Co., Inc.              
                                                            GC02-20        14,878                  05/08/17   05/12/17    Richard E. Alexander Co., Inc.      
                                                            GC02-21         3,203                  06/28/17   07/14/17    Richard E Alexander Co. Inc.        
                                                            HC04-01        -1,085                  03/18/16   03/23/16    Schmalz Mechanical Contractors, Inc.
                                                            HC04-02         8,087                  06/24/16   07/08/16    Schmalz Mechanical Contractors, Inc.
                                                            HC04-03        18,958                  09/12/16   11/16/16    Schmalz Mechanical Contractors, Inc.
                                                            HC04-04         8,651                  10/03/16   10/31/16    Schmalz Mechanical Contractors, Inc.
                                                            HC04-05         1,346                  10/24/16   12/16/16    Schmalz Mechanical Contractors, Inc.
                                                            PC05-03         1,130                  12/27/16   01/06/17    H.J. Brandeles                      
                                                            SC01-01             0                  03/24/16   12/28/16    Central NY Construction             
                                                            SC01-05        34,888                  07/25/16   09/30/16    Central New York Construction       
                                                            SC01-09        23,447                  10/05/16   11/09/16    Central New York Construction       
                                                            SC01-10        22,631                  10/03/16   10/31/16    Central New York Construction       
                                                            SC01-11        18,300                  10/05/16   11/09/16    Central New York Construction       
                                                            SC01-16         8,832                  10/24/16   12/16/16    Central NY Construction             
                                                            SC01-17        26,279                  10/24/16   12/16/16    Central NY Construction             
 
15-0591   Reconstruction               0-008-014  04/22/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  12/27/16   12/29/16    Putrelo Building Enterprises, Inc.  
                                                            GC-02               0                  05/08/17   05/09/17    Putrelo Building Enterprises        
                                                            GC-03          -2,218                  05/08/17   05/09/17    Putrelo Building Enterprises        
 
16-0646   Reconstruction               0-008-015  09/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02               0                  01/22/19   02/13/19    AUTOMATION EXPERTS, INC.            
                                                            EC-03               0                  02/06/19   02/25/19    AUTOMATION EXPERTS,INC.             
                                                            EC-05           1,589                  07/02/19   07/08/19    AUTOMATION EXPERTS, INC.            
                                                            GC-02-06        4,155                  10/03/18   10/29/18    PRIORE CONSTRUCTION                 
                                                            GC02-09         1,450                  01/22/19   02/25/19    PRIORE CONSTRUCTION                 
                                                            GC02-11           477                  02/06/19   02/25/19    PRIORE CONSTRUCTION                 
                                                            HVAC0301        1,447                  10/03/18   10/26/18    SCHMALZ MECHANICAL CONTRACTORS      
                                                            HVAC0302        3,105                  12/13/18   01/15/19    SCHMALZ MECHANICAL CONTRACTOR       
                                                            SC-01-04            0                  10/03/18   10/29/18    CNY CONSTRUCTION                    
                                                            SC-01-05            0                  10/03/18   10/29/18    CNY CONSTRUCTION                    
                                                            SC01-03             0                  02/19/19   02/25/19    CNY CONSTRUCTION                    
                                                            SC01-06             0                  01/22/19   02/25/19    CNY CONSTRUCTION, INC.              
                                                            SC01-08         3,132                  10/02/19   10/21/19    CNY CONSTRUCTION, INC.              
 
16-1655   Reconstruction               0-008-016  08/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  06/29/18   07/24/18    J. PRIORE CONSTRUCTION INC          
                                                            GC-02          -2,500                  06/29/18   07/31/18    J. Priore Construction Co., Inc.    
 
17-1428   Reconstruction               0-008-017  05/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1064   Reconstruction               0-008-018  04/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  09/22/20   02/10/21    SAHL'S GLASS & GLAZING, INC.        
                                                            GC-02         -11,254                  11/16/20   02/25/21    SAHL'S GLASS & GLAZING, INC.        
 
19-1445   Reconstruction               0-008-019  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAC-03         -3,675                  01/13/22   12/29/22    DSA Services Inc                    
                                                            AAC-04          3,498                  01/13/22   12/29/22    DSA Services Inc                    
                                                            EC-06               0                  01/28/22   01/25/23    SC Spencer Elec Inc                 
                                                            GC-04               0                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-05               0                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-06          -6,848                  08/15/22   09/26/23    Richard Alexander CO Inc            
                                                            GC-14          12,585                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-15             345                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            PC-02               0                  07/25/22   05/09/23    HJ Brandeles Corp                   
 
19-0588   Reconstruction               0-008-020  02/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02               0                  11/12/20   02/12/21    J&A ELECTRICAL CONSTRUTION, LLC     
                                                            EC-03          -7,893                  12/09/20   02/23/21    J&A ELECTRICAL CONSTRUCTION, LLC    
                                                            HVAC-02             0                  10/29/20   01/11/21    H.J. BRANDELES CORP.                
                                                            HVAC-03         1,606                  09/22/20   11/06/20    H.J. BRANDELES CORP.                
                                                            RC-03         -13,261                  10/29/20   02/09/21    J&B INSTALLATION, INC,              
                                                            RC-05               0                  11/03/21   08/25/22    J&B Installations, Inc              
 
20-1348   Reconstruction               0-008-021  03/25/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  10/05/21   11/22/22    Beebe Const Service                 
                                                            GC-02          -1,445                  10/05/21   11/22/22    Beebe Construction Service          
                                                            GC-03         -11,996                  10/15/21   08/16/22    Beebe Const                         
 
21-1028   Reconstruction               0-008-022  03/01/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  07/17/23   12/22/23    RICHARD E. ALEXANDER                
 
23-0647   Reconstruction               0-008-024  11/16/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1617FP Reconstruction               0-008-FP1  05/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-0851   Reconstruction               5-006-003  04/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0230   Reconstruction               5-006-005  12/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-12            2,309                  03/29/04   04/26/04    Panko Elec.                         
                                                            E5              2,378                  03/24/03   04/21/03    Panko Elec.                         
                                                            E6              1,719                  03/24/03   04/21/03    Panko Elec.                         
                                                            P-10           20,000                  03/09/05   03/24/05    Scharf Plumbing heating             
                                                            RGC-9             813                  03/29/04   04/07/04    HR Beebe                            
 
04-0871   Reconstruction               5-006-006  03/17/05  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0921   Reconstruction               5-006-007  05/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO GC-03        5,840                  01/21/11   02/24/11    RICHARD E ALEXANDER CO INC          
                                                            GC-01          -7,700                  09/28/10   10/28/10    RICHARD E ALEXANDER CO INC          
                                                            GC-02         -10,000                  10/25/10   11/05/10    RICHARD E ALEXANDER CO INC          
                                                            H-01             -922                  09/28/10   10/28/10    GIRUZZI PLUMBING & HEATING INC      
                                                            H-03           -1,250                  10/25/10   11/05/10    GIRUZZI PLUMBING & HEATING INC      
                                                            S-03            1,135                  09/28/10   10/28/10    BOLAND'S EXCAVATING & TOPSOIL       
                                                            S-04            2,396                  04/14/11   05/10/11    BOLAND'S EXCAVATING & TOPSOIL INC   
                                                            S-05            6,670                  05/11/11   07/13/11    BOLAND'S EXCAVATING & TOPSOIL INC   
 
12-0350   Reconstruction               5-006-008  09/09/13  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0586   Reconstruction               5-006-009  07/29/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC06-01        -1,776                  03/18/16   03/23/16    SC Spencer  Electric, Inc.          
                                                            EC06-04             0                  06/24/16   07/08/16    SC Spencer Electric, Inc.           
 
16-0644   Reconstruction               5-006-010  09/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC01-07             0                  02/06/19   02/25/19    CNY CONSTRUCTION                    
 
19-1446   Reconstruction               5-006-011  05/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FS-04          -1,474                  08/15/22     /  /      LaValley Bros Const                 
                                                            GC-09               0                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-13               0                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-17          19,018                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-20          -1,547                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            GC-21            -450                  08/15/22   09/26/23    Richard Alexander Co Inc            
                                                            PC-03               0                  07/25/22   05/09/23    HJ Brandeles Corp                   
                                                            PS-01               0                  10/05/21   12/02/22    LaValley Bros. Const                
                                                            SC-01               0                  01/13/22   12/29/22    Bolands Excavat&Topsoil Inc         
                                                            SC-02               0                  01/03/22   12/29/22    Bolands Excavating&Topsoil Inc      
                                                            SC-03           9,029                  07/25/22   05/22/23    Bolands Excavating&Topsoil Inc      
                                                            SC-05          -1,474                  08/15/22   05/22/23    LaValley Bros.                      
 

          Concession Building:
16-0645   Additions and Alterations    7-007-002  09/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  07/20/18   12/28/18    AUTOMATION EXPERTS INC              
                                                            EC-04          -5,045                  02/06/19   02/25/19    AUTOMATION EXPERTS,INC.             
                                                            GC-02-03          450                  07/20/18   09/12/18    PRIORE CONSTRUCTION                 
                                                            GC-02-04          750                  10/03/18   10/29/18    PRIORE CONSTRUCTION                 
                                                            GC-02-05        3,305                  10/03/18   10/29/18    PRIORE CONSTRUCTION                 
                                                            GC02-01             0                  04/25/18   05/03/18    J. Priore Construction Company, Inc.
                                                            GC02-10         3,205                  01/22/19   02/25/19    PRIORE CONSTRUCTION                 
                                                            GC02-12           232                  02/06/19   02/25/19    PRIORE CONSTRUCTION                 
                                                            PLBG0402       14,739                  10/03/18   10/26/18    SCHMALZ MECHANICAL CONTRACTORS      
                                                            SC01-02             0                  07/20/18   09/12/18    CNY CONSULTATION CSD                
 

          Press Box:
14-0587   New Construction             7-011-001  07/29/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
16-2004   Reconstruction               7-999-001  08/22/17  NO CHANGE ORDERS ON ELECTRONIC FILE

UTICA CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-23-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Proctor High School:
90-1098   Reconstruction               0-002-003  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0172   Reconstruction               0-002-004  09/18/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            014               833                  08/31/04   02/15/05    Edgebrook Construction Co           
                                                            GC-1           81,197                  01/07/05     /  /      Horizon Roofing Sheet Metal         
                                                            GC-2          -59,703                  01/07/05   04/15/05    Horizon Roofing Sheet Metal         
                                                            GC1-RRw1       81,197          81,197  04/02/03   Disapproved Horizon Roofing                     
                                                            GC2-RRW2      -59,703                  04/02/03     /  /      Horizon Roofing                     
 
00-0671   Additions and Alterations    0-002-005  07/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -96,700                  07/03/02   07/09/02    Northland Associates                
                                                            001             5,866                  07/08/02   03/28/03    Ritter & Paratore                   
                                                            001          -111,780                  07/16/02   10/30/02    Universal Custom Millwork           
                                                            001            33,807                  12/06/05     /  /      HJ Brandeles Corp                   
                                                            001           -80,600                  12/09/05     /  /      HJ Brandeles Corp                   
                                                            001             2,400                  01/23/09   04/03/09    WEATHER GUARD INDUSTRIES, INC.      
                                                            002            39,990                  12/06/05     /  /      Hj brandeles Corp                   
                                                            002            -5,325                  12/06/05     /  /      Universal Custom Millwork           
                                                            002           -19,390                  12/06/05     /  /      Northland Associates                
                                                            002          -323,301                  12/09/05   05/05/06    HJ Brandeles Corp                   
                                                            002            15,990                  01/23/09   04/03/09    WEATHER GUARD INDUSTERIES, INC.     
                                                            003            18,792                  12/06/05     /  /      HJ Brandeles Corp                   
                                                            003            -5,000                  12/06/05   12/09/05    Universal Custom Millwork           
                                                            003            42,417                  12/06/05     /  /      Northland Associates                
                                                            003            12,718                  01/23/09   04/03/09    WEATHER GUARD INDUSTERIES INC.      
                                                            004            31,434                  12/06/05     /  /      Northland Associates                
                                                            004            11,500                  01/23/09   04/03/09    WEATHER GUARD INDUSTERIES, INC.     
                                                            005           -25,000                  12/06/05     /  /      Northland Associates                
                                                            005            27,400                  01/23/09   04/03/09    WEATHER GUARD INDUSTRIES, INC.      
                                                            006            55,489                  12/06/05   04/26/06    Northland Associates                
                                                            012           -13,347                  12/06/05     /  /      Northland Associates                
                                                            AD S-1         13,860                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-10        14,811                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-11        13,803                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-12         1,568                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-13         1,256                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-14         2,716                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-2          3,650                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-3          1,965                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-4          3,588                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-5         10,569                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-6          5,915                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-7          8,510                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-8          3,680                  08/30/04   09/24/04    Ritter & Paratore                   
                                                            AD S-9            230                  08/30/04   09/24/04    Ritter & Paratore                   
 
02-1313   Reconstruction               0-002-006  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0302   Additions and Alterations    0-002-007  01/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00000040        4,425                  11/06/14   12/01/14    Weydman Electric & Communications   
                                                            0000010         9,901                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            0000011         5,269                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            0000012         1,700                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            00000122        2,334                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            0000013        14,129                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            0000014         6,288                  08/05/13   06/10/14    H.J. Brandeles Corporation          
                                                            0000014         3,244                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            0000015        21,899                  06/16/14   08/01/14    Weydman Electric & Communications   
                                                            0000017         1,060                  06/16/14   08/01/14    Weydman Electric & Communications   
                                                            0000017         7,860                  11/06/14   11/21/14    Scharf Plumbing & Heating, Inc.     
                                                            000002          3,924                  08/05/13   06/10/14    H.J. Brandeles Corporation          
                                                            000002          2,727                  11/06/14   11/21/14    Pulver Roofing Company, Inc.        
                                                            00000202        7,282                  11/06/14   11/21/14    National Building & Restoration Corp
                                                            00000203        1,290                  11/06/14   11/21/14    National Building & Restoration Corp
                                                            00000204        5,682                  11/06/14   11/21/14    National Building & Restoration Corp
                                                            00000205        1,239                  11/06/14   11/21/14    National Building & Restoration Corp
                                                            00000206        3,635                  11/06/14   11/21/14    National Building & Restoration Corp
                                                            00000208        1,010                  11/06/14   11/21/14    National Building & Restoration Corp
                                                            0000029         4,794                  08/05/13   08/26/13    Weydman Electric & Communications   
                                                            000003         13,492                  11/20/15   04/12/16    National Building & Restoration Corp
                                                            0000030           582                  08/05/13   08/26/13    Weydman Electric & Commuinications  
                                                            0000031           855                  08/05/13   06/10/14    Weydman Electric & Communications   
                                                            0000031           855                  08/05/13     /  /      Stieflitz Snyder Architecture       
                                                            0000032         1,973                  08/02/13   06/10/14    Weydman Electric & Communications   
                                                            0000033         1,698                  08/05/13   06/10/14    Weydman Electric & Communications   
                                                            0000033         8,672                  08/05/13   08/26/13    National Building & Restoration Corp
                                                            0000034         4,004                  08/05/13   06/10/14    Weydman Electric & Communications   
                                                            0000034         1,534                  08/05/13     /  /      National Building & Restoration Corp
                                                            0000035         1,221                  08/05/13   06/10/14    Weydman Electric & Communications   
                                                            0000035         3,895                  08/05/13   08/26/13    National Building & Restoration Corp
                                                            0000036        11,414                  08/05/13   06/10/14    National Building & Restoration Corp
                                                            0000037           996                  08/05/13   08/26/13    National Building & Restoration Corp
                                                            0000038         4,284                  08/05/13   06/10/14    National Building & Restoration Corp
                                                            0000039         2,101                  08/05/13   08/26/13    National Building & Restoration Corp
                                                            000004            991                  08/05/13   08/07/13    Scharf Plumbing & Heating, Inc.     
                                                            000004         17,221                  11/20/15   04/12/16    National Building & Restoration Corp
                                                            000004          1,129                  11/20/15     /  /      H.J. Brandeles Corporation          
                                                            0000040        14,646                  08/05/13   06/10/14    National Building & Restoration Corp
                                                            0000041         3,239                  11/06/14   12/01/14    Weydman Electric & Communications   
                                                            0000042         2,094                  11/06/14   12/01/14    Weydman Electric & Communications   
                                                            000005          6,450                  08/05/13   06/10/14    Scharf Plumbing & Heating, Inc.     
                                                            000005         21,900                  11/20/15   04/12/16    National Building & Restoration Corp
                                                            000005          4,014                  11/20/15   04/12/16    H.J. Brandeles Corporation          
                                                            000005          1,105                  11/20/15   12/02/15    Weydman Electric Inc.               
                                                            000006          8,904                  08/05/13   06/10/14    Weydman Electric & Communications   
                                                            000006          1,300                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            000006         -6,223                  11/20/15   12/02/15    H.J. Brandeles Corporation          
                                                            000006          1,632                  11/20/15   04/12/16    Weydman Electric Inc.               
                                                            0000063         1,224                  08/05/13   06/10/14    National Building & Restoration Corp
                                                            0000064           690                  08/05/13     /  /      National Building & Restoration Corp
                                                            0000065         2,158                  08/05/13   08/26/13    National Building & Restoration Corp
                                                            0000066         6,395                  08/05/13   08/26/13    National Building & Restoration Corp
                                                            0000067         2,083                  08/05/13   06/10/14    National Building & Restoration Corp
                                                            0000068         1,256                  08/05/13   06/10/14    National Building & Restoration Corp
                                                            0000069         6,599                  08/05/13   08/26/13    National Building & Restoration Corp
                                                            000007          4,698                  08/05/13   06/10/14    Weydman Electric & Communications   
                                                            000007         21,341                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            000007          1,100                  11/20/15   12/02/15    H.J. Brandeles Corporation          
                                                            000007              9             397  11/20/15     /  /      Weydman Electric Inc.               
                                                            000008            479                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            000008          1,541                  11/20/15   12/02/15    H.J. Brandeles Corporation          
                                                            000009          3,494                  11/20/15   12/02/15    National Building & Restoration Corp
                                                            000009          3,907                  11/20/15   12/02/15    H.J. Brandeles Corporation          
                                                            00001          17,000                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00001          19,712                  03/26/13   02/21/14    SCHARF PLUMBING AND HEATING INC     
                                                            00001           5,676                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00001          33,776                  03/26/13   06/17/13    PULVER ROOFING COMPANY INC          
                                                            00001           2,197                  10/19/15   11/17/15    National Building & Restoration Corp
                                                            00001          -2,339                  10/19/15   11/17/15    Weydman Electric, Inc.              
                                                            00001             828                  10/03/16   10/25/16    Edgebrook Construction              
                                                            00002           1,376                  03/02/12   07/20/12    H.J. BRANDELES CORPORATION          
                                                            00002           4,736             710  03/02/12   03/06/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00002           2,280                  03/02/12   03/06/13    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00002          18,229                  11/08/12   03/15/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00002          38,528                  03/26/13   02/21/14    SCHARF PLUMBING & HEATING INC       
                                                            00002           3,699                  03/26/13   06/17/13    PULVER ROOFING COMPANY INC          
                                                            00002           2,775                  10/19/15   11/17/15    National Building & Restoration Corp
                                                            00002           1,915                  10/19/15   11/17/15    H.J. Brandeles Corporation          
                                                            00002           1,397                  10/19/15   11/17/15    Weydman Electric Inc.               
                                                            00002           4,294                  10/03/16     /  /      Edgebrook Construction              
                                                            00003           3,252                  03/02/12   07/20/12    H.J. BRANDELES CORPORATION          
                                                            00003          11,331                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00003           5,559                  03/02/12   03/06/13    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00003           5,698                  11/08/12   03/21/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00003             519                  11/08/12   03/15/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00003          15,807                  03/26/13   02/21/14    SCHARF PLUMBING & HEATING INC       
                                                            00003           1,088                  03/26/13   06/17/13    PULVER ROOFING COMPANY INC          
                                                            00003           2,373                  03/13/15   03/24/15    H.J. Brandeles Corporation          
                                                            00003             567                  10/19/15   11/17/15    H.J. Brandeles Corporation          
                                                            00003          -4,693                  10/19/15   11/17/15    Weydman Electric Inc.               
                                                            00003           9,727                  10/03/16   10/25/16    Edgebrook Construction              
                                                            00004           3,797                  03/02/12   03/07/13    H.J. BRANDELES CORPORATION          
                                                            00004           1,554                  03/02/12   03/06/13    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00004           2,096                  11/08/12   03/15/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00004           4,222                  11/08/12   03/15/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00004          11,831                  03/26/13   06/17/13    PULVER ROOFING COMPANY INC          
                                                            00004           9,864                  04/17/13   02/21/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00004           1,011                  10/19/15   11/17/15    Weydman Electric Inc.               
                                                            00004           5,761                  10/03/16   10/25/16    Edgebrook Construction              
                                                            00005           3,155                  03/02/12   03/07/13    H.J. BRANDELES CORPORATION          
                                                            00005          24,026                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00005           4,544                  03/02/12   03/07/13    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00005          19,993                  01/14/13   03/28/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00005          19,465                  03/26/13   06/17/13    PULVER ROOFING COMPANY INC          
                                                            00005           9,512                  04/17/13   02/21/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00005           6,331                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00005           5,670                  12/27/16   01/10/17    Edgebrook Construction              
                                                            00006           7,605                  03/02/12   03/07/13    H.J. BRANDELES CORPORATION          
                                                            00006           6,040                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00006           3,112                  03/02/12   03/07/13    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00006          -4,920                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00006          14,557                  03/26/13   06/17/13    PULVER ROOFING COMPANY INC          
                                                            00006           4,853                  04/17/13   07/09/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00006           2,248                  12/27/16   01/05/17    Edgebrook Construction              
                                                            00007          18,042                  03/02/12   03/07/13    H.J. BRANDELES CORPORATION          
                                                            00007           3,147                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00007           6,985                  03/02/12   03/07/13    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00007           1,806                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00008           8,915                  03/02/12   03/07/13    H.J. BRANDELES CORPORATION          
                                                            00008           6,556                  03/02/12     /  /      NATIONAL BUILDING & RESTORATION CORP
                                                            00008             381                  03/02/12   03/07/13    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00008          -1,363                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00009           7,285                  03/02/12   03/07/13    H.J. BRANDELES CORPORATION          
                                                            00009           7,626                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00009           3,772             565  02/06/13   02/14/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00009             961                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00009           1,349                  01/25/16   02/19/16    WEYDMAN ELECTRIC INC                
                                                            00010           9,983                  03/02/12   03/07/13    H.J. BRANDELES CORPORATION          
                                                            00010           2,742                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00010           3,271                  02/06/13   02/14/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00010            -489                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00010           4,842                  01/25/16   02/08/16    H.J. BRANDELES CORPORATION          
                                                            00010             528                  01/25/16   02/08/16    WEYDMAN ELECTRIC INC                
                                                            00011           1,053                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00011           1,785             267  02/06/13   02/14/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00011           6,223                  03/26/13   02/21/14    H.J. BRANDELES CORPORATION          
                                                            00011             464                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00012          13,674                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00012           2,781                  02/06/13   02/14/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00012           3,956                  03/26/13   02/21/14    H.J. BRANDELES CORPORATION          
                                                            00012           4,264                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00012           3,633                  01/25/16   04/12/16    WEYDMAN ELECTRIC INC                
                                                            00013          27,348                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00013           1,086                  02/06/13   02/14/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00013             555                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00013           1,626                  01/25/16   02/09/16    WEYDMAN ELECTRIC INC                
                                                            00013          -3,910                  12/27/16   01/05/17    H.J. Brandeles Corporation          
                                                            00014          18,566                  03/02/12   07/20/12    NATIONAL BUILDING & RESTORATION CORP
                                                            00014           1,334                  02/06/13   06/17/19    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00014           2,089                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00014           1,313                  07/30/15   08/27/15    Putrelo Building                    
                                                            00014           1,311                  01/25/16   02/09/16    WEYDMAN ELECTRIC INC                
                                                            00015          21,889                  10/16/12   11/15/13    Weydman Electric & Communications   
                                                            00015          10,030                  02/06/13   05/02/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00015           5,792                  04/17/13     /  /      NATIONAL BUILDING & RESTORATION CORP
                                                            00015           6,356                  07/30/15   08/27/15    Putrelo Building                    
                                                            00015           4,566                  01/25/16   02/19/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00015           8,864                  01/25/15   02/09/16    WEYDMAN ELECTRIC INC                
                                                            00016           1,721                  10/16/12   03/15/13    Weydman Electric & Communications   
                                                            00016          11,414                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00016          12,647                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00016           2,946                  07/30/15   08/27/15    Putrelo Building                    
                                                            00016           8,476                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00017           1,060                  10/16/12   12/31/13    Weydman Electric & Communications   
                                                            00017           2,078                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00017           4,103                  04/19/13   07/09/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00017          17,600                  07/30/15   08/27/15    Putrelo Building                    
                                                            00017           1,434                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00017           1,311                  01/25/16   02/09/16    WEYDMAN ELECTRIC INC                
                                                            00018           1,544                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00018           1,936                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00018           2,243                  07/30/15   08/27/15    Putrelo Building                    
                                                            00018           7,280                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00018           6,921                  01/25/16   02/09/16    WEYDMAN ELECTRIC INC                
                                                            00019           8,391                  01/14/13   03/28/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00019           4,173                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00019           1,829                  07/30/15   08/27/15    Putrelo Building                    
                                                            00019           7,030                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00019          11,949                  01/25/16   02/09/16    WEYDMAN ELECTRIC INC                
                                                            00020          11,067                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00020           3,403                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00020           1,771                  07/30/15   08/27/15    Putrelo Building                    
                                                            00020          12,823                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00021           5,457                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00021            -919                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION     
                                                            00021           1,408                  07/30/15   08/27/15    Putrelo Building                    
                                                            00021           3,700                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00022           5,239                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00022          12,545                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00022           1,461                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00023          11,762                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00023          24,613                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00023           2,961                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00024          16,147                  03/26/13   07/09/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00024          16,797                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00024          14,846                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00025           2,817                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00025           8,555                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00025         -24,089                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00026           3,636                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00026             746                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00026         -19,476                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00027          11,282                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00027           5,063                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00027           5,510                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00028           8,342                  01/14/13   03/28/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00028           2,911             430  04/17/13   02/21/14    WEYDMAN ELECTRIC & COMMUNICATIONS   
                                                            00028           1,118                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00028          10,247                  01/25/16   02/08/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00029          11,025                  01/14/13   03/28/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00029           2,842                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00030           4,891                  01/14/13   03/28/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00030           1,144                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00030           2,488                  08/12/16     /  /      Weydman Electric, Inc.              
                                                            00031           3,227                  01/14/13   03/28/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00031           1,794                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00031          10,878                  08/12/16     /  /      Weydman Electric, Inc.              
                                                            00032           6,096                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00032           7,299                  04/17/13   07/10/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00032           2,881                  08/12/16     /  /      Weydman Electric, Inc.              
                                                            00033          -1,192                  03/26/13   06/17/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00033           2,397                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            00033             745                  08/12/16     /  /      Weydman Electric, Inc.              
                                                            00034           3,410                  11/08/12   03/15/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00034          36,201                  10/03/16   10/25/16    Weydman Electric, Inc.              
                                                            00035           4,929                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00035           5,614                  12/13/16   02/14/17    Weydman Electric, Inc.              
                                                            00036           3,924                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00037           2,836                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00038           1,808                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00039           2,757                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00040           1,436                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00041           2,755                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00042           2,934                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00043          12,474                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00044           5,862                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00045           5,169                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00046          11,053                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00047           7,039                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00048          10,799                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00049           3,015                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00050          14,385                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00051           4,739                  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00052          14,388          14,388  04/17/13   07/03/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00053             394                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00054           6,383                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00055           4,743                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00056           1,435                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00057          11,322                  04/17/13   07/09/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00058           5,056                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00059           3,552                  03/26/13   06/19/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00060           7,456                  04/17/13   07/09/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00061         -10,698                  03/26/13   02/21/14    NATIONAL BUILDING & RESTORATION CORP
                                                            00062           1,002                  04/17/13   07/09/13    NATIONAL BUILDING & RESTORATION CORP
                                                            00064             369                  08/12/16     /  /      National Building & Restoration Corp
                                                            00065           2,878                  08/12/16     /  /      National Building & Restoration Corp
                                                            00066           2,706                  08/12/16     /  /      National Building & Restoration Corp
                                                            00067             281                  08/12/16     /  /      National Building & Restoration Corp
                                                            00068           4,345                  08/12/16     /  /      National Building & Restoration Corp
                                                            00069           1,564                  08/12/16     /  /      National Building & Restoration Corp
                                                            00070          -9,333                  08/12/16     /  /      National Building & Restoration Corp
                                                            00071           1,177                  08/12/16     /  /      National Building & Restoration Corp
                                                            00072             730                  08/12/16     /  /      National Building & Restoration Corp
                                                            00073         -15,000                  03/04/15   03/11/15    National Building & Restoration Corp
                                                            00073            -956                  08/12/16     /  /      National Building & Restoration Corp
                                                            00074           2,729                  08/12/16     /  /      National Building & Restoration Corp
                                                            00075           7,186                  10/03/16   10/25/16    National Building & Restoration Corp
                                                            00076         -35,000                  10/03/16   10/25/16    National Building & Restoration Corp
                                                            00077          11,437                  12/13/16   01/11/17    National Building & Restoration     
                                                            00078           3,250                  12/27/16   01/10/17    National Building & Restoration Corp
                                                            00079          -4,481                  12/27/16   01/10/17    National Building & Restoration Corp
                                                            00207          11,137                  12/22/14   01/13/15    National Building & Restoration Corp
                                                            022             3,489                  04/07/16   05/24/16    Weydman Electric Inc.               
                                                            1              10,000                  03/23/15   03/30/15    HJ Brandeles Corporation            
                                                            1               3,837                  04/01/15   06/19/15    National Building & Restoration Corp
                                                            1               3,002                  04/24/15   05/20/15    Putrelo Building                    
                                                            1               5,142                  05/15/15   05/21/15    Pulver Roofing Company, Inc.        
                                                            10              2,224                  02/04/15   02/10/15    HJ Brandeles Corporation            
                                                            10             19,104                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            10                286                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            10              2,124                  06/08/15   07/09/15    Putrelo Building                    
                                                            100            -3,483                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            101             9,175                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            102             5,534                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            103               792                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            104             3,425                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            105             5,565                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            106             1,178                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            107            -6,393                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            108             4,852                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            109             7,015                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            11              4,661                  02/04/15   02/10/15    HJ Brandeles Corporation            
                                                            11             16,784                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            11                477                  03/23/15   03/30/15    Weydman Electric & Communication    
                                                            11              1,818                  06/08/15   07/09/15    Putrelo Building                    
                                                            11              3,094                  04/07/16   05/19/16    H.J. Brandeles Corporation          
                                                            110              -426                  03/13/15   03/31/15    National Building & Restoraiton Corp
                                                            111               971                  03/13/15   03/31/15    National Building & Restoraiton Corp
                                                            112             1,881                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            113             9,316                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            114             5,266                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            115            19,995                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            116             6,799                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            117            19,922                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            118            18,757                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            119             5,733                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            12             11,083                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            12              1,180                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            12              4,614                  06/08/15   08/05/15    Putrelo Building                    
                                                            120             7,124                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            121             4,173                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            123            10,851                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            124             8,166                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            125             5,713                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            126             1,729                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            127            18,202                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            128               945                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            129               936                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            13              4,579                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            130               734                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            131             2,344                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            132             1,956                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            133             9,400                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            134             1,613                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            135            15,311                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            136            13,085                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            137             7,672                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            138               650                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            139             1,912                  03/13/15   03/24/15    National Building & Renovations Corp
                                                            14              5,308                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            14              3,643                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            140             3,677                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            141             2,688                  03/16/15   03/24/15    National Building & Restoration Corp
                                                            142             2,233                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            143             5,618                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            144             9,531                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            145             1,079                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            146             5,313                  03/13/15   04/23/15    National Building & Restoration Corp
                                                            147             7,247                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            148            11,762                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            149             2,502                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            15                831                  03/04/15   03/25/15    HJ Brandeles Corporaiton            
                                                            15              2,059                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            150            19,875                  03/16/15     /  /      National Building & Restoration Corp
                                                            151             9,453                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            152             7,225                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            153             4,717                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            154            23,517                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            155             2,897                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            156             4,714                  03/16/15   03/24/15    National Building & Restoration Corp
                                                            157             1,087                  03/13/15   03/24/15    National Building & Restoratoin Corp
                                                            158             1,057                  03/17/15   03/24/15    National Building & Restoration Corp
                                                            159             2,453                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            16              4,130                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            16              7,948                  03/23/15   03/30/15    Weydman Electric & Commmunications  
                                                            160             3,924                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            161             3,155                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            162             2,480                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            163             4,253                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            164               815                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            165             1,956                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            166             1,071                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            167             5,222                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            168             2,681                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            169            10,990                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            17                433                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            170             3,964                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            171             1,024                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            172             3,367                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            173             5,996                  03/13/15   03/24/15    National Building & Restoraiton Corp
                                                            174             8,749                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            175             7,347                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            176             7,016                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            177             1,982                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            178             4,429                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            179             3,511                  03/13/15   03/24/15    National Building & Restoratoin Corp
                                                            18             28,306                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            18              4,744                  03/13/15   03/24/15    Scharf Plumbing & Heating, Inc.     
                                                            18              2,662                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            180             6,487                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            181             4,879                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            182             8,210                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            183             3,283                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            184             4,831                  03/13/15   03/24/15    National Building & Restoraiton Corp
                                                            185             4,903                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            186             3,703                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            187             4,752                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            188             2,424                  03/13/15   03/24/15    National Building & Restoraiton Corp
                                                            189             2,009                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            19             17,180                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            19              2,018                  03/13/15   03/24/15    Scharf Plumbing & Heating, Inc.     
                                                            19              2,356                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            190             1,298                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            191             1,900                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            192               804                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            193            13,790                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            194             2,354                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            195             2,751                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            196             2,815                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            197            18,422                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            198             3,690                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            199             8,580                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            2               5,582                  04/01/15   06/19/15    National Building & Restoration Corp
                                                            2               2,040                  04/24/15   05/20/15    Putrelo Building                    
                                                            20              8,300                  02/04/15   02/10/15    Scharf Plumbing & Heating, Inc.     
                                                            20             14,538                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            20              4,364                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            200             1,999                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            201               933                  03/23/15   03/30/15    National Building & Restoration Corp
                                                            209            20,296                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            21              3,235                  02/04/15   02/10/15    Scharf Plumbing & Heating, Inc.     
                                                            21              1,010                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            21              1,509                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            21              2,430                  04/07/16   05/19/16    Weydman Electric Inc.               
                                                            210             1,166                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            211               405                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            212            -7,875                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            213            -2,954                  03/13/15     /  /      National Building & Restoration Corp
                                                            214             1,316                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            215             1,066                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            216             1,506                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            217             8,999                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            218               825                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            219           150,000                  03/13/15     /  /      National Building & Restoration Corp
                                                            22              1,354                  02/04/15   02/10/15    Scharf Plumbing & Heating, Inc.     
                                                            22              2,603                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            22              2,083                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            220             7,307                  03/13/15   03/24/15    National Building & Restoration Corp
                                                            221             1,922                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            222               967                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            223             1,967                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            224             4,215                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            225             3,166                  02/04/15   02/10/15    National Building & Restoraiton Corp
                                                            226               991                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            227             3,602                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            228             8,655                  02/04/15   02/10/15    National building & Restoration Corp
                                                            229            -8,042                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            23             27,137                  02/04/15   03/26/15    Weydman Electric & Communications   
                                                            23                710                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            23              3,874                  04/07/16   05/19/16    Weydman Electric, Inc.              
                                                            230             6,321                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            231             1,888                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            232            17,158                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            233             3,475                  04/01/15   06/19/15    National Building & Restoration Corp
                                                            24                722                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            24                833                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            24             -1,159                  04/07/16   05/19/16    Weydman Electric, Inc.              
                                                            25             17,882                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            25              2,555                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            25                625                  04/07/16   05/19/16    Weydman Electric, Inc.              
                                                            26              5,604                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            26             11,488                  05/12/15   10/14/16    Weydman Electric & Communications   
                                                            26              4,875                  04/07/16     /  /      Weydman Electric, Inc.              
                                                            27              1,540                  03/04/15   03/26/15    Weydman Electric & Communications   
                                                            27              4,191                  05/12/15   10/14/16    Weydman Electric & Communications   
                                                            28             23,079                  05/12/15     /  /      Weydman Electric & Commiunications  
                                                            29             13,070                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            29              5,562                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            3               2,373                  03/13/15     /  /      National Building & Restoration Corp
                                                            3               4,223                  04/01/15   06/19/15    National Building & Restoration Corp
                                                            3               2,166                  05/26/15   06/01/15    Putrelo Building                    
                                                            30              1,777                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            30              3,501                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            31              2,766                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            31              2,497                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            32              5,395                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            32              2,737                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            33             18,495                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            34              1,264                  05/12/15   05/21/15    Weydman Electric & Communciations   
                                                            34              2,921                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            35              4,488                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            35              2,193                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            36              5,117                  03/13/15   03/31/15    Weydman Electric & Communications   
                                                            36                726                  05/12/15   05/21/15    Weydman electric & Communications   
                                                            36            -31,324                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            37              3,305                  03/13/15   03/31/15    Weydman Electric & Communications   
                                                            37              2,423                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            37              3,579                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            38              4,733                  05/12/15   05/21/15    Weydman Electric & Communications   
                                                            38             10,895                  04/07/16   05/19/16    National Building & Restoratoin Corp
                                                            39              2,041                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            4               1,481                  03/23/15   03/30/15    HJ Brandeles Corporation            
                                                            4              10,565                  04/01/15   04/20/15    National Building & Restoration Corp
                                                            4               2,555                  04/24/15   05/20/15    Putrelo Building                    
                                                            40               -602                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            41              4,988                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            41              4,958                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            42              2,480                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            42                  0                    /  /       /  /                                          
                                                            42                412                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            43                659                  03/03/15   06/18/15    Weydman Electric & Communications   
                                                            43              4,713                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            43              1,206                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            44              7,092                  02/04/15     /  /      National Building & Restoration Corp
                                                            44              1,235                  04/06/16   05/19/16    National Building & Restoration Corp
                                                            45                969                  03/13/15   03/31/15    Weydman Electric & Communications   
                                                            45              7,324                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            45             10,673                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            46              4,232                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            46              7,856                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            47              7,331                  03/13/15   03/31/15    Weydman Electric  Communications    
                                                            47              1,284                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            47              1,602                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            48              5,619                  03/13/15   03/31/15    Weydman Electric & Communications   
                                                            48              2,343                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            48             -4,920                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            49              1,045                  03/13/15   03/31/15    Weydman Electric & Communications   
                                                            49              6,340                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            49                836                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            5                 572                  03/23/15   03/30/15    HJ Brandeles Corporation            
                                                            5                   0                  04/24/15   05/20/15    Putrelo Building                    
                                                            5               2,463                  05/22/15   06/01/15    National Building & Restoration Corp
                                                            50              3,011                  02/04/15   02/10/15    Weydman Electric & Communications   
                                                            50             15,415                  03/13/15   03/31/15    National Building & Restoraiton Corp
                                                            50              5,583                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            51              1,189                  02/04/15   02/10/15    Weydman Electric & Communications   
                                                            51             15,780                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            51              2,426                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            52              1,970                  02/04/15   02/10/15    Weydman Electric & Communications   
                                                            52              3,769                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            52              1,295                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            53              6,963                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            53              1,621                  04/07/16   05/19/16    National Building & Restoration Corp
                                                            54              4,693                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            54              8,156                  02/04/14   02/10/15    Weydman Electric & Communications   
                                                            55                996                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            55              3,268                  02/04/15   02/10/15    Weydman Electric & Communications   
                                                            56              2,554                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            56              3,582                  02/04/15   02/10/15    Weydman Electric & Communications   
                                                            57              2,535                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            57              2,281                  02/04/15   02/10/15    Weydman Electric & Communications   
                                                            58              5,513                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            58              1,717                  02/04/15   02/10/15    Weydman Electric & Communications   
                                                            59              3,088                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            6               9,865                  03/13/15   03/24/15    Scharf Plumbing & Heating, Inc.     
                                                            6                 746                  03/23/15   03/30/15    HJ Brandeles Corporation            
                                                            6               2,771                  04/24/15   05/20/15    Putrelo Building                    
                                                            60              8,362                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            61              6,671                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            62              2,131                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            63              6,795                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            64              2,680                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            65             14,694                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            66              8,297                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            67            -75,095                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            68              2,637                  02/04/15   02/10/15    National Building & Restoraiton Corp
                                                            69             16,480                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            7               1,180                  03/13/15   03/24/15    Scharf Plumbing & Heating, Inc.     
                                                            7               1,365                  03/23/15   03/30/15    HJ Brandeles Corporation            
                                                            7                 576                  04/24/15   05/20/15    Putrelo Building                    
                                                            70              3,112                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            70              3,805                  03/04/15   03/26/15    National Building & Restoration Corp
                                                            71                831                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            71              4,138                  03/04/15   03/26/15    National Building & Restoration Corp
                                                            72              1,387                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            72            -18,000                  03/04/15   03/11/15    National Building & Restoration Corp
                                                            73             11,099                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            74             13,874                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            74             -4,000                  03/04/15   03/11/15    National Building & Restoration Corp
                                                            75             16,988                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            75              2,348                  03/04/15   03/11/15    National Building & Restoration Corp
                                                            76             10,732                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            76              1,055                  03/04/15   03/11/15    National Building & Restoration Corp
                                                            77              7,175                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            77              3,608                  03/04/15   03/26/15    National Building & Restoration Corp
                                                            78              3,165                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            78             -2,500                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            79              4,127                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            8                 934                  03/23/15   03/30/15    HJ Brandeles Corporation            
                                                            8               1,195                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            8               7,800                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            8              17,342                  04/24/15     /  /      Puterlo Building                    
                                                            80              2,742                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            81              2,435                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            82              6,332                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            83              2,319                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            84              5,430                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            85              3,977                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            86              4,594                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            87              1,680                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            88              8,226                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            89              2,939                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            9                 849                  03/23/15   03/30/15    HJ Brandeles Corporation            
                                                            9               4,659                  03/23/15   03/30/15    Scharf Plumbing & Heating, Inc.     
                                                            9               7,219                  03/23/15   03/30/15    Weydman Electric & Communications   
                                                            9               2,375                  05/15/15   05/21/15    Putrelo Building                    
                                                            90              1,078                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            91             18,562                  02/04/15   02/10/15    National Building & Restoration Corp
                                                            92                750                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            93              1,809                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            94              1,982                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            95             18,493                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            96             15,950                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            97             13,507                  03/13/15   03/31/15    National Building & Restoraton Corp 
                                                            98              4,331                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            99             13,934                  03/13/15   03/31/15    National Building & Restoration Corp
                                                            E-14            1,334                  02/06/13     /  /      WEYDMAN ELECTRIC & COMMUNICATION    
                                                            E-38            6,845                  05/20/19   05/21/19    WEYDMAN ELECTRIC, INC.              
                                                            E-39           13,649                  05/20/19   05/21/19    WEYDMAN ELECTRIC, INC.              
                                                            GC-01           3,436                  01/18/19   02/11/19    EDGEBROOK CONSTRUCTION CO., INC.    
                                                            GC-10         -28,000                  04/10/17   05/16/17    Edgebrook Construction              
                                                            GC-11           7,713                  04/10/17   05/16/17    Edgebrook Construction              
                                                            GC-12           4,620                  04/10/17   05/16/17    Edgebrook Construction              
                                                            GC-14           2,029                  03/15/18   03/20/18    Edgebrook Construction              
                                                            GC-15             514                  03/15/18   03/20/18    Edgebrook Construction              
                                                            GC-19          -4,777                  10/16/20   01/06/21    J. PRIORE CONSTRUCTION CO.,INC.     
                                                            GC-2           38,000                  06/13/16   07/07/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-219        150,000                  03/13/15   02/02/18    National Building & Restoration Corp
                                                            GC-22          -1,776                  05/16/16   05/27/16    PUTRELO BUILDING ENTERPRISES        
                                                            GC-23         -16,250                  05/16/16   05/27/16    PUTRELO ENTERPRISES                 
                                                            GC-24          -3,000                  05/16/16   05/27/16    PUTRELO ENTERPRISES                 
                                                            GC-54        -135,135                  05/16/16     /  /      NATIONAL BUILDING & RESTORATIONS    
                                                            GC-55            -600                  05/16/16   05/27/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-57           2,550                  05/16/16   05/27/16    NATIONAL BUIILDING & RESTORATION    
                                                            GC-58            -790                  05/16/16   05/27/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-59           2,491                  05/16/16   05/27/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-60           3,088                  05/16/16   05/27/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-61           1,561                  05/16/16   05/27/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-62           2,287                  05/16/16   05/27/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-63           2,215                  05/16/16   05/27/16    NATIONAL BUILDING & RESTORATION     
                                                            GC-7            5,558                  04/10/17   05/16/17    Edgebrook Construction              
                                                            GC-8            1,297                  04/10/17   05/16/17    Edgebrook Construction              
                                                            GC-9            1,615                  04/10/17   05/16/17    Edgebrook Construction              
                                                            M-12            1,176                  05/16/16   07/08/16    H J BRANDELES CORP                  
                                                            M-14            6,932                  04/26/17   05/17/19    H.J. Brandeles Corporation          
 
18-1393   Reconstruction               0-002-009  04/16/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            1,991                  03/07/22     /  /      McGinnis Nelson Const               
                                                            GC-03           1,991                  11/08/21   12/07/22    Mcginnis Nelson Const               
                                                            GC-04          20,981                  03/10/22   03/06/23    McGinnis Nelson Const               
                                                            GC-1            9,520                  10/16/20   01/06/21    MURPHY EXCAVATING CORP.             
                                                            GC-1            1,135                  11/08/21   12/07/22    McGinnis Nelson Const               
                                                            GC-1            1,135                  03/07/22     /  /      McGinnis Nelson Const               
                                                            GC-1           -2,400                  03/10/22   02/23/23    Murphy Excavating Corp              
                                                            GC-2           10,794                  10/16/20   01/06/21    MURPHY EXCAVATING CORP.             
                                                            GC-2            3,063                  11/08/21   12/07/22    McGinnis Nelson Const               
                                                            GC-2            3,063                  03/07/22     /  /      McGinnis Nelson Const               
                                                            GC-3           16,581                  04/19/21   05/18/21    MURPHY EXCAVATION CORP.             
                                                            GC-4           23,619                  04/19/21   05/25/21    MURPHY EZCAVATION CORP.             
                                                            GC-5           30,669                  04/19/21   05/18/21    MURPHY EXCAVATION CORP.             
                                                            GC-5            5,710                  03/10/22   03/06/23    McGinnis Nelson Const               
                                                            GC-6            8,781                  03/10/22   03/06/23    McGinnis Nelson Const               
                                                            GC-6            5,452                  03/10/22   03/06/23    Murphy Excavate Corp                
                                                            GC-7            6,757                  03/10/22   02/23/23    Murphy Excavating Corp              
 
18-1772   Reconstruction               0-002-010  05/29/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           1,895                  04/11/22   04/25/23    Murnane Bldg Contrs Inc             
                                                            GC-02           1,453                  11/08/21   12/07/22    Murnane Bldg Const, Inc             
                                                            MC-1-01        -2,940                  12/16/21   09/27/22    HJ Brandeles Corp                   
                                                            PC2-01          4,360                  04/19/21   07/29/21    GIRUZZI PLUMBING & HEATING, INC.    
 
19-1124   Reconstruction               0-002-011  04/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-1            2,602                  03/10/22     /  /      Murnane Bldg Contrs Inc             
                                                            GC-2              601                  04/11/22   04/25/23    Murnane Bldg Contrs Inc             
                                                            GC-3           10,335                  04/11/22   04/25/23    Murnane Bldg Contrs Inc             
 
21-1180FC Reconstruction               0-002-013  02/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0624SC Visual Structural Inspection 0-002-SC1  01/06/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Albany Street School:
98-0033   Reconstruction               0-003-002  09/18/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC1-SW1         3,967                  04/02/03     /  /      Hanna Construction                  
 
01-0554   Reconstruction               0-003-003  04/22/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005             9,085                  08/31/04   02/14/05    Edgebrrok Construction Company      
                                                            009            12,884                  08/31/04     /  /      Edgebrrok Construciton Co           
                                                            016              -461                  08/31/04   02/14/05    Edgebrrok Construction Co           
                                                            AD GC-24        2,735                  06/09/04   06/14/04    Edgebrook Construction              
                                                            AD GC-25       10,750                  08/31/04   04/15/05    Edgebrrok Construciton Co           
                                                            AD-GC-19        1,950                  06/09/04   06/14/04    Edgebrook Construction              
                                                            AD-H-2          3,221                  05/24/04   05/26/04    HJ Brandeles                        
                                                            AD-H-3            595                  05/24/04   05/26/04    HJ Brandeles                        
                                                            GC-7            2,380                  06/09/04   06/14/04    Edgebrook Construction              
 
00-0171   Reconstruction               0-003-004  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             6,969                  08/31/04   02/14/05    Edgebrrok construction Co           
                                                            010             1,782                  08/31/04   02/14/05    struction Co                        
                                                            AD GC-15        1,135                  06/09/04   06/22/04    Edgebrook Const.                    
                                                            AD GC-18        1,060                  06/09/04   06/22/04    Edgebrook Const.                    
 
02-1314   Reconstruction               0-003-005  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0213   Additions and Alterations    0-003-006  01/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          -2,708                  10/20/10   11/17/10    WEYDMAN ELECTRIC INC                
                                                            00002           6,522                  10/20/10   11/17/10    H.J. BRANDELES                      
                                                            00002          24,808                  01/20/11     /  /      CHARLES A GAETANO CONSTRUCTION CORP 
                                                            00003             138                  10/20/10   11/17/10    WEYDMAN ELECTRIC INC                
                                                            00003            -865                  10/20/10   11/17/10    CHARLES A GAETANO CONSTRUCTION CORP 
                                                            00003          10,000                  01/20/11   02/22/11    H.J. BRANDELES                      
                                                            00004          11,548                  10/20/10     /  /      CHARLES A GAETANO CONSTRUCTION CORP 
                                                            00004          13,778                  04/19/11   05/12/11    WEYDMAN ELECTRIC INC                
                                                            00005           3,898                  01/20/11   02/22/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00005          -3,561                  04/19/11   05/12/11    H.J. BRANDELES                      
                                                            00006             515                  01/20/11   02/17/11    CHARLES A GAETANO CONSTRUCTION LLC  
                                                            00007           2,497                  01/20/11   02/17/11    CHARLES A GAETANO CONSTRUCTION LLC  
                                                            00007           2,713                  01/20/11   02/22/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00008          20,000                  01/20/11   02/17/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00008           1,976                  01/20/11   02/22/11    WEYDMAN ELECTRIC INC                
                                                            00009          50,000                  01/20/11   02/17/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00010          19,130                  01/20/11   02/17/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00011          25,000                  01/20/11   02/17/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00012           3,530                  01/20/11   02/17/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00013          10,000                  01/20/11   02/17/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00015          75,000                  01/20/11   02/17/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00015           3,357                  07/28/11   11/08/11    H.J. BRANDELES                      
                                                            00016          20,000                  01/20/11   02/22/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00016           1,481                  07/28/11   08/23/12    H.J. BRANDELES                      
                                                            00017           1,333                  01/20/11   02/22/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00018           4,298                  01/20/11   02/22/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00018           4,503                  09/22/11   11/08/11    H.J. BRANDELES                      
                                                            00019          25,000                  01/20/11   02/22/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00020           5,553                  01/20/11   02/22/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00020          -1,384                  04/27/11   05/19/11    WEYDMAN ELECTRIC INC                
                                                            00021           3,969                  01/20/11   02/22/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00021             341                  12/13/11   09/07/12    H.J. BRANDELES                      
                                                            00022           2,271           2,271  01/20/11   02/22/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00024           7,300           1,460  06/10/11   08/23/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00025          -2,717                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00026          -8,097                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00027         -10,748                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00028            -827                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00029          -5,617                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00030         -20,741                  04/19/11   05/12/11    CHARLES A GAETANO CONSTRUCTION LLC  
                                                            00030          69,603                  02/06/13   06/18/19    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00031         -11,258                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00031          87,384                  07/13/12   06/18/19    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00031          87,384                  02/06/13   06/18/19    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00032          10,238                  07/13/12     /  /      WEYDMAN ELECTRIC INC                
                                                            00032          10,238                  02/06/13   06/17/19    WEYDMAN ELECTRIC INC                
                                                            00034             265                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00036          -2,659                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00037             467                  10/26/11   08/28/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00041             595              89  10/26/11   08/28/12    WEYDMAN ELECTRIC INC                
                                                            00042         -87,387                  10/16/12   08/09/13    Schmalz Mechanical Contractors, I   
                                                            00044           1,837                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00048             577                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00051           4,060                  12/13/11   09/07/12    WEYDMAN ELECTRIC INC                
                                                            00055           1,569                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00059           6,023                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00062           8,456                  03/02/12   07/24/13    WEYDMAN ELECTRIC INC                
                                                            00063             837                  07/13/12   10/18/13    WEYDMAN ELECTRIC INC                
                                                            00063             837                  02/06/13   02/14/14    WEYDMAN ELECTRIC INC                
                                                            00064         -10,238                  10/16/12   12/31/13    Weydman Electric, Inc.              
                                                            00067             553                  10/16/12   06/05/13    Weydman Electric, Inc               
                                                            00082           1,160                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00088           5,081                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00101           7,469                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00106           7,705                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00107           1,698                  07/28/11   09/09/11    CHARLES A GAETANO CONSTRUCTION LLC  
                                                            00108           1,410                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00110          55,000                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00112           4,615                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00113           1,192                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00117           3,396                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00123             817                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00125          18,595                  09/22/11   01/19/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00126           9,342                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00128           3,318                  09/22/11   01/19/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00131          18,170                  09/22/11   01/19/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00133          19,397                  09/22/11   01/19/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00135          14,572                  09/22/11   01/19/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00136           1,701                  09/22/11   01/19/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00137           2,516                  09/22/11   11/01/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00139           1,914                  12/07/11   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00141           1,649                  12/07/11   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00146           3,700                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00148           2,104                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00149           5,315                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00150           8,040                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00154             537                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00156         -37,445                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00157         -10,700                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00162           1,044                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00164             518                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00165           1,369                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00166           4,085                  03/02/12   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00167             197                  03/02/12   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00172          -5,081                  10/16/12   06/05/13    Charles Gaetano Construction LLC    
 
21-1181FC Reconstruction               0-003-008  02/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1848SC Visual Structural Inspection 0-003-SC1  04/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Proctor High Stadium-FieldWBleachers:
07-0174FP Reconstruction               0-005-FP1  04/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Chris Columbus School:
97-0154   Reconstruction               0-007-003  08/14/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            5,578                  01/07/05     /  /      Pulver Roofing Co                   
                                                            GC-2           29,172                  02/22/05   04/15/05    Pulver roofing Co                   
                                                            GC1 RW1         5,578                  04/02/03   04/15/05    Pulver Roofing Company              
                                                            GC1 SW1         9,800           9,800  01/19/05   Disapproved George nole and Son Inc             
                                                            GC2-SW2        21,000          21,000  04/02/03   Disapproved George A. Nole & Sons               
 
01-0663   Reconstruction               0-007-004  09/11/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005            -8,010                  08/31/04   02/14/05    Park City Builders                  
                                                            006            11,479                  08/31/04   02/14/05    Park City Builders                  
                                                            015             4,342                  08/31/04   04/15/05    Park City Builders                  
                                                            020             1,266                  08/31/04   02/14/05    Park City Builders                  
                                                            022               798                  01/31/05   02/08/05    Turner Construction                 
                                                            029             1,124                  05/05/05   06/21/05    Park City Builders of NY            
                                                            030             4,985                  05/05/05   06/21/05    Park City Builders of NY            
                                                            AD GC-20        9,322                  08/31/04   02/14/05    Park City Builders                  
                                                            AD GC-34        5,858                  08/31/04   02/14/05    Park City Builders                  
                                                            AD GC-44          706                  08/31/04   02/14/05    Park City Builders                  
                                                            AD GC-49        9,540                  08/31/04   02/14/05    Park City Builders                  
                                                            AD GC-67        3,113                  10/28/04   11/19/04    Park City Builders                  
                                                            AD GC-69          710                  10/28/04   06/21/05    Park City Builders                  
                                                            AD-GC-27          883                  06/17/04   06/22/04    Park City Builders                  
 
01-1200   Reconstruction               0-007-005  09/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD GC-2         5,055                  08/31/04   02/14/05    Park City Builders of New York      
                                                            AD GC-23        5,652                  08/31/04   04/15/05    Park City Builder                   
                                                            AD GC-75        1,500                  01/31/05   02/08/05    Park City Builders                  
                                                            AD P-10           780                  08/31/04   02/14/05    HJ brandeles Corp                   
                                                            AD P4           1,180                  08/31/04   02/14/05    HJ Brandeles Corp                   
                                                            GC-76             450                  05/05/05   06/21/05    Park City Builders of NY            
                                                            ad GC-19        5,800                  08/31/04   02/14/05    Park City Builders                  
 
02-1315   Reconstruction               0-007-006  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1539   Reconstruction               0-007-007  05/07/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,332                  10/20/10   11/23/10    TITAN ROOFING INC                   
                                                            00004           1,800                  10/20/10   11/23/10    TITAN ROOFING INC                   
                                                            00007           3,000                  04/27/11   05/13/11    TITAN ROOFING INC                   
                                                            00008          -2,128                  01/20/11   02/04/11    TITAN ROOFING INC                   
                                                            00012            -441                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00013           4,040                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00014          -2,683                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00015             900                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00017           1,799                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00019           4,387                  09/22/11   11/01/11    TITAN ROOFING INC                   
                                                            00020           1,765                  09/22/11   11/01/11    TITAN ROOFING INC                   
                                                            00021           4,665                  09/22/11   11/01/11    TITAN ROOFING INC                   
 
11-0589   Reconstruction               0-007-008  03/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          26,000                  09/08/15   09/18/15    HJ Brandeles                        
                                                            00001         149,165                  09/08/15   09/18/15    Schmalz Mechanical Contractors Inc. 
                                                            00002         150,000                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00002          30,000                  11/23/15   12/23/15    Ridley Electric                     
                                                            00002          16,000                  11/23/15   12/23/15    H.J. Brandeles                      
                                                            00003          24,400                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00003           8,000                  09/08/15   09/18/15    Ridley Electric                     
                                                            00004          36,000                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00005          22,700                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00005             300                  11/23/15   12/23/15    Ridley Electric                     
                                                            00006          -1,931                  04/01/15   04/08/15    Schmalz Mechanical Contractors, Inc.
                                                            00006          -5,061                  05/05/15   05/29/15    HJ Brandeles                        
                                                            00007           1,471                  03/27/15   04/02/15    Ridley Electric                     
                                                            00007           1,635                  05/05/15   05/29/15    Schmalz Mechanical Contractors, Inc.
                                                            00007             298                  06/18/15   02/10/17    HJ Brandeles                        
                                                            00007         118,000                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00008             600                  03/27/15   04/02/15    Ridley Electric                     
                                                            00009           3,075                  06/29/15   07/22/15    Schmalz Mechanical Contractors, Inc.
                                                            00010           1,563                  03/27/15   04/02/15    Edgebrook Construction              
                                                            00011             847                  08/14/15     /  /      H.J. Brandeles                      
                                                            00011           6,164                  08/14/15     /  /      Schmalz Mechanical Contractors, Inc.
                                                            00012           2,600                  03/27/15   04/02/15    Edgebrook Construction              
                                                            00013           1,201                  10/19/15   11/19/15    Schmalz Mechanical Contractors, Inc.
                                                            00014             900                  01/25/16   02/04/16    H.J. BRANDELES                      
                                                            00016           2,778                  04/01/15   02/10/17    Ridley Electric                     
                                                            00020           3,228                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00021           1,156                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00022           7,448                  06/08/15   06/17/15    Ridley Electric                     
                                                            00023           3,512                  09/08/15   09/18/15    Edgebrook Construction              
                                                            00025           2,562                  06/08/15   06/17/15    Edgebrook Construction              
                                                            00028           1,259                  06/18/15   07/07/15    Ridley Electric                     
                                                            00029             649                  06/08/15   06/17/15    Edgebrook Construction              
                                                            00030           5,210                  06/08/15   06/17/15    Edgebrook Construction              
                                                            00032           2,035                  06/08/15   06/17/15    Edgebrook Construction              
                                                            00033           2,839                  06/08/15   06/17/15    Edgebrook Construction              
                                                            00033           1,163                  08/14/15   08/26/15    Ridley Electric                     
                                                            00034           2,010                  06/08/15   06/17/15    Edgebrook Construction              
                                                            00036           6,097                  08/14/15     /  /      Ridley Electric                     
                                                            00036             936                  06/29/15   07/30/15    Edgebrook Construction              
                                                            00037          -1,159                  08/14/15   08/26/15    Ridley Electric                     
                                                            00038           1,898                  08/14/15   08/26/15    Edgebrook Construction              
                                                            00039           5,605                  08/14/15   08/26/15    Ridley Electric                     
                                                            00041           9,484                  08/14/15   11/19/15    Edgebrook Construction              
                                                            00041             637                  10/19/15   11/19/15    Ridley Electric                     
                                                            00042           2,729                  10/19/15   11/19/15    Ridley Electric                     
                                                            00042           1,279                  08/14/15   08/26/15    Edgebrook Construction              
                                                            00043           4,184                  08/14/15   08/26/15    Edgebrook Construction              
                                                            00043             757                  10/19/15   11/19/15    Ridley Electric                     
                                                            00044           5,110                  10/19/15   11/19/15    Ridley Electric                     
                                                            00046             562                  10/19/15   11/19/15    Edgebrook Construction              
                                                            00050         -14,387                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00053           2,800                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00055             178                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00056           1,605                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00057           4,387                  01/25/16   02/04/16    EDGEBROOK CONSTRUCITON              
                                                            00062           9,379                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00065             178                  03/31/16   04/12/16    Edgebrook Construction              
                                                            00066          -9,451                  07/05/16   10/05/16    Edgebrook Construction              
                                                            00069            -178                  03/31/16   04/12/16    Edgebrook Construction              
                                                            00070           1,426                  03/31/16   04/12/16    Edgebrook Construction              
                                                            00073             730                  03/31/16   04/12/16    Edgebrook Construction              
                                                            00074           7,686                  03/31/16   04/12/16    Edgebrook Construction              
                                                            00077           2,599                  07/05/16   07/27/16    Edgebrook Construction              
                                                            E-36            6,097                  02/23/17   09/14/17    Ridley Electric                     
                                                            M-11            6,164                  02/23/17   09/14/17    Schmalz Mechanical Contractors, Inc.
                                                            P-11              847                  02/23/17   09/14/17    H.J. Brandeles                      
 
16-0456   Reconstruction               0-007-010  08/02/16  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1153   Reconstruction               0-007-011  03/30/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01             665                  11/08/21   12/12/22    Usmail Electric, Inc                
                                                            EC-01             665                  03/07/22   03/27/23    Usmail Elec Inc                     
                                                            EC-01           1,852                  03/10/22   02/22/23    Oneida Elec Contrs Inc              
                                                            GC-1            4,796                  03/10/22   03/06/23    Nat Bldg&Restor Corp                
                                                            HMC-01         23,600                  04/19/21   07/29/21    AKTOR CORP.                         
                                                            HMC-02          8,150                  04/19/21   07/29/21    AKTOR CORP.                         
                                                            HMC-03          6,410                  04/19/21   07/29/21    AKTOR CORP.                         
                                                            MC-01          48,600                  04/19/21   07/29/21    GIRUZZI PLUMBING & HEATING, INC.    
                                                            MC-02          14,129                  04/19/21   07/29/21    GIRUZZI PLUMBING & HEATING, INC.    
                                                            MC-1            6,893                  03/10/22   02/22/23    Giruzzi Plumb&Heat Inc              
                                                            MC-1            1,159                  03/10/22   02/22/23    Giruzzi Plumb&Heat Inc              
 
03-0224FP Reconstruction               0-007-FP1  09/15/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1847SC Visual Structural Inspection 0-007-SC1  04/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roscoe Conkling School:
98-0084   Reconstruction               0-008-002  09/18/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC1-RRW1       19,220          19,220  04/02/03   Disapproved Pulver Roof Company Inc             
 
01-0555   Reconstruction               0-008-003  04/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,950                  08/31/04   02/14/05    HJ Brandeles Corp                   
                                                            015             2,975                  08/31/04   02/14/05    Edgebrrok Construction Co           
                                                            AD GC-17          955                  06/09/04   06/14/04    Edgebrook Construction              
                                                            AD GC27        33,180                  08/31/04   04/15/05    Edgebrrok Construction Co           
                                                            AD-GC-23            0                  06/09/04   06/14/04    Edgebrook Construction              
 
00-0170   Reconstruction               0-008-004  04/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0004            4,953                  08/31/04   02/14/05    Edgebrrok Consturction Co           
                                                            011             6,324                  08/31/04     /  /      Edgebrrok Construction Co           
                                                            AD GC-2         1,985                  06/15/04   06/22/04    Edgebrook Construction              
                                                            AD GC-22        1,047                  06/09/04   06/14/04    Edgebrook Construction              
                                                            AD GC-3         1,774                  06/09/04   06/22/04    Edgebrook Construction              
                                                            AD GC-5         1,380                  06/15/04   06/22/04    Edgebrook Construction              
                                                            AD-GC-11          715                  06/09/04   06/22/04    Edgebrook Construction              
 
02-1316   Reconstruction               0-008-005  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0212   Reconstruction               0-008-006  12/28/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            0000002         1,426                  08/05/13   08/26/13    Edgebrook Construction              
                                                            00004           1,428                  01/20/11   02/22/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00005          11,460                  10/20/10     /  /      CHARLES A GAETANO CONSTRUCTION CORP 
                                                            00005          13,778                  04/19/11   05/12/11    WEYDMAN ELECTRIC INC                
                                                            00006           5,558                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00007           2,859                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00008           2,401                  01/20/11   02/22/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00008           2,274                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00009           1,064                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00009           2,472                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00010           4,029                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00010             703                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00011           3,683                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00011           1,060                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00012          12,913                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00012           7,083                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00013           1,564                  04/19/11     /  /      SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00013           3,198                  06/10/11   11/08/11    H.J. BRANDELES                      
                                                            00014           2,376                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00014           1,787                  07/28/11   11/08/11    H.J. BRANDELES                      
                                                            00015          -2,524                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00016           7,175                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00016           4,879                  04/27/11     /  /      WEYDMAN ELECTRIC INC                
                                                            00017             712                  04/19/11   05/12/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00017           2,428                  04/27/11   05/19/11    WEYDMAN ELECTRIC INC                
                                                            00017           1,502                  09/22/11   11/08/11    H.J. BRANDELES                      
                                                            00018           2,645                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00019          13,734                  04/27/11   05/19/11    WEYDMAN ELECTRIC INC                
                                                            00019           1,078                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00019             414                  09/22/11   11/08/11    H.J. BRANDELES                      
                                                            00020             471                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00020           1,770                  12/13/11   05/15/12    H.J. BRANDELES                      
                                                            00021          -1,384                  04/27/11   05/19/11    WEYDMAN ELECTRIC INC                
                                                            00021          -1,716                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00022           3,551                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00022             278                  06/10/11   11/08/11    WEYDMAN ELECTRIC INC                
                                                            00023          75,000                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00023           7,756                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00024          25,000                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00024           8,984                  06/10/11   11/08/11    WEYDMAN ELECTRIC INC                
                                                            00025             328                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00025           4,051                  06/10/11   11/08/11    WEYDMAN ELECTRIC INC                
                                                            00026          17,458                  06/10/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00026           1,835                  07/28/11   11/08/11    WEYDMAN ELECTRIC INC                
                                                            00027             461                  07/28/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00028             461                  07/28/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00028          10,000                  07/28/11   01/31/14    WEYDMAN ELECTRIC INC                
                                                            00029             509                  07/28/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00029           2,012                  07/28/11   11/08/11    WEYDMAN ELECTRIC INC                
                                                            00030             953                  07/28/11   11/08/11    WEYDMAN ELECTRIC INC                
                                                            00030          69,603                  07/13/12     /  /      SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00032          15,000                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00032             465                  09/22/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00033         -21,940                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00033             598                  09/22/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00033          23,995                  07/13/12   07/03/13    WEYDMAN ELECTRIC INC                
                                                            00034             696                  09/22/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00034             478                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00035           2,094                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00035           7,185                  09/22/11   11/08/11    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00035             355                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00036           5,623                  10/26/11   10/24/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00036             745                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00037             549                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00037           1,149                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00038         -19,495                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00038          -4,934                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00038           5,619                  03/02/12   09/18/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00039             820                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00039           9,612                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00039           1,903                  03/02/12   09/18/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00040           1,903                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00040           2,839                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00040           5,505                  03/02/12   09/18/12    SCHMALZ MECHANICAL CONTRACTORS INC  
                                                            00041           3,601                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00041         -69,603                  10/16/12   06/05/13    Schmalz Mechanical Constrtors, I    
                                                            00042          14,703                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00042             386                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00043           4,004                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00043             367                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00043           7,620                  10/16/12   08/09/13    Schmalz Mechanical contractors, I   
                                                            00045          -1,512                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00046          11,672                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00047             338                  04/19/11     /  /      CHARLES GAETANO CONSTRUCTION LLC    
                                                            00047           8,000                  10/26/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00049             577                  04/19/11   05/15/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00049           7,386                  12/13/11     /  /      WEYDMAN ELECTRIC INC                
                                                            00050         -22,480                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00050            -883                  12/13/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00051          -6,280                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00052            -414                  04/19/11   05/12/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00053         114,780                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00054          66,509                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00056          97,153                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00056           2,031                  12/13/11   05/15/12    WEYDMAN ELECTRIC INC                
                                                            00057            -268                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00058          30,571                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00060          10,159                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00061           9,238                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00061           7,941                  03/02/12   09/18/12    WEYDMAN ELECTRIC INC                
                                                            00062           7,457                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00063           1,297                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00064           3,528                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00065           2,715                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00065         -23,995                  10/16/12   08/09/13    Weydman Electric, Inc               
                                                            00066         -10,230                  06/10/11   06/21/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00067           4,088                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00068           2,981                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00069           3,283                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00070          25,000                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00071           1,892                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00072           7,457                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00073             650                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00074           6,540                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00075           1,308                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00076           3,031                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00077           4,165                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00078          13,257                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00079           6,455                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00080           4,366                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00081           1,233                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00083             625                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00084           2,443                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00085           2,300                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00086           1,777                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00087             623                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00089           2,822                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00090           2,775                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00091          13,075                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00092          13,130                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00093          11,758                  06/10/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00094           3,094                  07/28/11   09/09/11    CHARLES A GAETANO CONSTRUCTION LLC  
                                                            00095           2,540                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00096           2,970                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00097           1,284                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00098             805                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00099             456                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00100             868                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00102           8,832                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00103           1,509                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00104          15,024                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00105          14,422                  07/28/11   09/09/11    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00109           2,273                  07/28/11   09/09/11    CHARLES A GAETANO CONSTRUCTION LLC  
                                                            00111          23,183                  07/13/12   12/26/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00111          23,183                  02/06/13   06/17/13    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00114           1,503                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00115           2,674                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00116          -1,756                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00118             726                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00119           1,110                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00120             715                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00121             659                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00122             817                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00124           2,616                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00127          17,818                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00129           7,842                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00130             237                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00132          47,725                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00134           4,793                  09/22/11   01/18/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00138          35,000                  12/07/11   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00140          12,000                  12/07/11   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00142          15,287                  12/07/11   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00143             988                  12/07/11   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00144          11,500                  12/07/11   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00145          16,308                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00147          -2,250                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00151           8,040                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00152           1,933                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00153             416                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00155             889                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00158         -36,439                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00159          -3,794                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00160             -52                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00161            -516                  12/13/11   08/22/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00168           3,989                  03/02/12   10/24/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00169           1,622                  07/13/12   12/26/12    CHARLES GAETANO CONSTRUCTION LLC    
                                                            00170          -4,672                  10/16/12   06/05/13    Charles Gaetano Construction LLC    
                                                            00171         -23,183                  10/16/12   08/09/13    Charles Garano Construction LLC     
 

          John F Hughes School:
98-0034   Reconstruction               0-009-002  09/18/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            4,960                  01/07/05   04/15/05    Fred Burrows Trucking Excavating    
                                                            GC1-RRW1       19,315                  04/02/03   04/15/05    Pulver Roofing Company              
                                                            GC1-SW1        54,560                  04/02/03     /  /      Fred Burrows Trucking Excavation    
 
00-1153   Reconstruction               0-009-003  09/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -16,974                  01/19/05   03/17/05    Hj brandeles                        
                                                            001           -27,348                  01/19/05   03/17/05    Superior Plumbing Heating           
                                                            002             5,858                  11/01/04   02/14/05    Kogut Electric                      
                                                            003              -354                  01/19/04   03/17/05    Kogut Electric                      
                                                            AD E-1         15,482                  08/26/04   09/24/04    Kogut Electric                      
                                                            AD E-4          1,367                  11/01/04   02/14/05    Kogut Electric                      
                                                            AD GC-10        4,100                  09/27/04   12/24/04    Edgebrook Construction              
                                                            AD GC-11        1,527                  11/01/04   02/14/05    Edgebrook Construction Co           
                                                            AD GC-12        1,152                  11/01/04   02/14/05    Edgebrook Construction Co           
                                                            AD GC-13        9,857                  11/01/04   04/15/05    Edgebrook Construction              
                                                            AD GC-14        9,857                  11/08/04   04/15/05    Edgebrook Construction Co           
                                                            AD GC-15        7,459                  11/01/04   02/14/05    Edgebrook Construction Co           
                                                            AD GC-16        9,794                  11/01/04     /  /      Edgebrook Construction Co           
                                                            AD GC-17          625                  11/01/04   02/14/05    Edgebrook Construction              
                                                            AD GC-18        1,164                  01/19/05   03/17/05    Edgebrook Construction Co           
                                                            AD GC-19        2,810                  01/19/05   03/17/05    Edgebrook Construction Co           
                                                            AD GC-4         4,700                  08/26/04   09/24/04    Edgebrook Construction              
                                                            AD GC-5         1,527                  08/26/04   09/24/04    Edgebrook Construction              
                                                            AD GC-6         5,948                  08/26/04   09/24/04    Edgebrook Construction              
                                                            AD GC-8         7,281                  08/26/04   09/24/04    Edgebrook Construction              
                                                            AD GC-9           933                  08/26/04   09/24/04    Edgebrook Construction              
                                                            AD H-1          4,924                  11/01/04   04/15/05    HJ Brandeles                        
                                                            AD H-2            672                  01/19/05   03/17/05    Hj brandeles Corp                   
                                                            AD H-3          1,430                  01/19/05   03/17/05    Hj brandeles Corp                   
                                                            AD P-1            729                  08/26/04   09/24/04    Superior Plumbing                   
                                                            AD P-2         -3,655                  09/20/04   02/15/05    Superior Plumbing Heating           
                                                            AD P-3         -4,268                  11/01/04     /  /      Superior Plumbing Heating           
                                                            E-1              -902                  08/30/04   09/24/04    Kogut Electric                      
                                                            GC-001         -4,320                  09/20/04   02/15/05    Edgebrrok Construction              
                                                            GC-002         -1,753                  11/01/04   04/24/06    Edgebrook Construction              
                                                            GC-003         -4,211                  01/19/05   03/17/05    Edgebrook Construction Co           
 
00-1284   Reconstruction               0-009-004  06/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD E-2          4,618                  08/26/04   09/24/04    Kogut Electric                      
                                                            AD E-3          2,179                  11/01/04   02/14/05    Kogut Electric                      
                                                            AD GC-2         4,035                  09/20/04   09/29/04    Edgebrrok Construction              
                                                            AD GC-3         2,415                  08/26/04   09/24/04    Edgebrook Construction              
                                                            AD GC-7           595                  08/30/04   09/24/04    Edgebrook Construction              
                                                            GC-1            3,532                  06/17/04   06/22/04    Edgebrook Construction              
 
02-1317   Reconstruction               0-009-005  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1540   Reconstruction               0-009-006  05/07/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           3,332                  10/20/10   11/23/10    TITAN ROOFING INC                   
                                                            00002          -5,800                  10/20/10   11/23/10    TITAN ROOFING INC                   
                                                            00003           6,300                  10/20/10   11/23/10    TITAN ROOFING INC                   
                                                            00005          15,667                  10/20/10   11/23/10    TITAN ROOFING INC                   
                                                            00006          14,694                  10/20/10   11/23/10    TITAN ROOFING INC                   
                                                            00009         135,000                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00011           1,358                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00016           1,800                  04/19/11   05/13/11    TITAN ROOFING INC                   
                                                            00018          -1,210                  09/22/11   11/01/11    TITAN ROOFING INC                   
 
11-0569   Reconstruction               0-009-007  04/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0000038        14,080                  11/20/15   12/23/15    J. Priore Construction Co. Inc.     
                                                            0000039         1,321                  11/20/15   12/23/15    J. Priore Construction Co. Inc.     
                                                            0000040         1,724                  11/20/15   12/23/15    J. Priore Construction Co. Inc.     
                                                            0000041         3,570                  11/20/15   12/23/15    J. Priore Construction Co. Inc.     
                                                            0000050        -5,000                  12/01/14   12/15/14    George A. Nole and Sons             
                                                            00004           3,623                  03/26/13   06/17/13    GEORGE A NOLE AND SONS              
                                                            00005           4,305                  03/26/13   06/17/13    GEORGE A NOLE AND SONS              
                                                            00006           1,964                  04/22/16   05/09/16    Giruzzi Plumbing & Heating, Inc.    
                                                            00009          22,083                  08/14/15   08/26/15    Giruzzi Plumbing & Heating, Inc.    
                                                            00010           6,392                  03/07/16   03/11/16    Giruzzi Plumbing & Heating, Inc.    
                                                            00019             391                  04/22/16   05/09/16    J. Priore Construction Co. Inc.     
                                                            00020           2,000                  09/08/14   09/12/14    George A. Nole and Sons             
                                                            00020           6,041                  04/22/16   05/09/16    J. Priore Construction Co. Inc.     
                                                            00021           2,802                  04/22/16   05/09/16    J. Priore Construction Co. Inc.     
                                                            00022          10,084                  04/22/16   05/09/16    J. Priore Construction Co. Inc.     
                                                            00023           1,773                  04/22/16   05/09/16    J. Priore Construction Co. Inc.     
                                                            00028B          1,468                  04/22/16   05/09/16    J. Priore Construction Co. Inc.     
                                                            00033             235                  08/14/15   08/26/15    J. Priore Construction Co. Inc.     
                                                            00034         -31,000                  08/27/14   09/05/14    Geroge A. Nole and Sons             
                                                            00034          22,997                  08/14/15   08/26/15    J. Priore Construction Co. Inc.     
                                                            00035           8,829                  08/14/15   08/26/15    J. Priore Construction Co. Inc.     
                                                            00036         -93,874                  08/14/15   08/26/15    J. Priore Construction Co. Inc.     
                                                            00037          17,273                  04/22/16   05/09/16    J. Priore Construction Co. Inc.     
                                                            00038           1,321                  12/30/13   02/04/14    George A. Nole and Sons             
                                                            00038          -1,167                  08/14/15   08/26/15    Patricia Electric, Inc.             
                                                            00040            -374                  10/19/15   11/19/15    Patricia Electric Inc.              
                                                            00041            -798                  10/19/15   11/19/15    Patricia Electric Inc.              
                                                            00042            -862                  10/19/15   11/19/15    Patricia Electric Inc.              
                                                            00042          17,786                  11/20/15   12/23/15    J. Priore Construction Co. Inc.     
                                                            00046             852                  03/07/16   03/11/16    Patricia Electric Inc.              
                                                            0031            2,170                  04/22/16   11/20/19    J. Priore Construction Co. Inc.     
                                                            1               1,914                  02/04/15   02/06/15    J Priore Construction Co. Inc.      
                                                            10              6,864                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            10              4,462                  05/15/15   06/18/15    Giruzzi Plumbing & Heating Inc.     
                                                            11                675                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            11               -684                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            11             -7,900                  05/15/15   06/18/15    Giruzzi Plumbing & Heating Inc.     
                                                            11                929                  01/25/16   02/04/16    Giruzzi Plumbing & Heating, Inc.    
                                                            12              1,643                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            12               -667                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            12              6,976                  01/25/16   02/04/16    Giruzzi Plumbing & Heating, Inc.    
                                                            12              5,073                  01/25/16   02/04/16    Giruzzi Plumbing & Heating, Inc.    
                                                            13             -8,703                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            13              5,582                  01/25/16   02/04/16    Giruzzi Plumbing & Heating, Inc.    
                                                            14            -13,600                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            14                759                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            15              3,432                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            15              1,446                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            16              3,480                  02/04/15   11/19/19    J Priore Construction Co Inc.       
                                                            16              1,590                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            17             12,857                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            18              2,500                  02/04/15   11/19/19    J Priore Construction Co Inc.       
                                                            2               5,350                  02/04/15   02/06/15    J Priore Construction Co., Inc.     
                                                            2               1,583                  02/04/15   02/06/15    Giruzzi Plumnbing & Heating, Inc.   
                                                            20              2,198                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            21                927                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            22              1,659                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            23              1,562                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            24                991                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            24              4,868                  05/15/15   06/18/15    J. Priore Construction Co. Inc.     
                                                            25              9,541                  03/13/15   03/31/15    Patricia Electric Inc.              
                                                            25              2,537                  05/05/15   05/29/15    J. Priore Constuction Co. Inc.      
                                                            26                798                  03/13/15   03/31/15    Patricia Electric Inc.              
                                                            26                580                  05/15/15   06/18/15    J. Priore Construction Co. Inc.     
                                                            27               -194                  05/15/15   11/19/19    J. Priore Construction Co. Inc.     
                                                            27              1,422                  03/31/16   04/12/16    Patricia Electric Inc.              
                                                            28                263                  06/08/15   06/17/15    J. Priore Construction Co. Inc.     
                                                            28                798                  03/31/16   04/12/16    Patricia Electric Inc.              
                                                            29              1,977                  06/08/15   06/17/15    J. Priore Construcrion Co. Inc.     
                                                            29              3,924                  03/31/16   04/12/16    Patricia Electric Inc.              
                                                            3              18,628                  02/04/15   02/06/15    Giruzzi Plumbing & Heating, Inc.    
                                                            30              1,552                  06/08/15   06/17/15    J. Priore Construction Co. Inc.     
                                                            31              1,289                  06/08/15   05/09/16    J. Priore Construction Co. Inc.     
                                                            32                763                  06/08/15   06/17/15    Patricia Electric Inc.              
                                                            32              1,289                  06/08/15   06/17/15    J. Priore Construction Co. Inc.     
                                                            34             -1,085                  06/18/15   07/07/15    Patricia Electric Inc.              
                                                            35                717                  06/29/15   07/30/15    Patricia Electric Inc.              
                                                            36              3,660                  06/29/15   07/30/15    Patricia Electric Inc.              
                                                            37              2,574                  06/29/15   07/30/15    Patricia Electric Inc.              
                                                            4               7,900                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            4               8,816                  02/04/15   02/06/15    Giruzzi Plumbing & Heating, Inc.    
                                                            4                 326                  03/13/15   03/31/15    Patricia Electric Inc.              
                                                            43              5,589                  03/31/16   04/12/16    J. Priore Construction Co. Inc.     
                                                            43                881                  03/31/16   04/12/16    Patricia Electric Inc.              
                                                            44             -5,040                  03/31/16   04/12/16    J. Priore Construction Co. Inc.     
                                                            45              1,469                  01/25/16   02/04/16    Patricia Electric Inc.              
                                                            45              4,944                  03/31/16   04/12/16    J. Priore Construction Co. Inc.     
                                                            46              5,248                  03/31/16   04/12/16    J. Priore Construction Co. Inc.     
                                                            47              7,060                  03/31/16   04/12/16    Patricia Electric Inc.              
                                                            48              8,850                  03/31/16   04/12/16    J. Priore Construction Co. Inc.     
                                                            48              4,234                  03/31/16   04/12/16    Patricia Electric Inc.              
                                                            5               1,915                  02/04/15   11/19/19    J Priore Construction Co Inc.       
                                                            5               1,822                  02/04/15   02/06/15    Giruzzi Plumbing & Heating, Inc.    
                                                            5               2,231                  03/13/15   03/31/15    Giruzzi Plumbing & Heating Inc.     
                                                            50              6,657                  03/31/16   04/12/16    J. Priore Construction Co. Inc.     
                                                            6                   0                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            6                   0                  03/13/15   03/31/15    Giruzzi Plumbing & Heating, Inc.    
                                                            6               1,354                  03/13/15   03/31/15    Patricia Electric Inc.              
                                                            7               4,895                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            7                 942                  03/13/15   03/31/15    Giruzzi Plumbing & Heating, Inc.    
                                                            7                -242                  05/15/15   11/20/19    Giruzzi Plumbing & Heating Inc.     
                                                            8                 886                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            8               1,261                  03/13/15   03/31/15    Giruzzi Plumbing & Heating, Inc.    
                                                            8                 664                  06/08/15   11/20/19    Giruzzi Plumbing & Heating, Inc.    
                                                            9                 571                  02/04/15   02/06/15    J Priore Construction Co Inc.       
                                                            9               1,230                  02/04/15   02/06/15    Patricia Electric Inc.              
                                                            9              10,025                  03/13/15   03/31/15    Giruzzi Plumbing & Heating, Inc.    
                                                            GC-47         -26,984                  06/13/16   07/27/16    J. PRIORE CONSTRUCTION              
                                                            GC-49           1,380                  11/16/17   12/04/17    J. Priore Construction Co. Inc.     
 
16-1140   Reconstruction               0-009-008  09/12/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -4,615                  12/14/18   01/15/19    MURNANE BUILDING CONTRACTORS        
                                                            GC-02           2,837                  12/14/18   01/15/19    MURNANE BUILDING CONTRACTORS        
                                                            GC-03           3,275                  01/18/19   02/25/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-04           3,763                  01/18/19   02/25/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-05           3,880                  05/20/19   05/21/19    MURNANE BUILDING CONTRACTORS, INC.  
 
02-1845SC Visual Structural Inspection 0-009-SC1  04/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Thomas Jefferson School:
90-1099   Reconstruction               0-010-002  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0080   Reconstruction               0-010-004  09/18/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           23,427                  01/07/05   04/15/05    Pulver Roofing Co                   
                                                            GC-1            6,267                  01/07/05   04/15/05    Hanna Construction                  
                                                            GC-1-SW1        6,267                  04/02/03     /  /      Hanna Construction                  
                                                            GC1-RRW1       23,427                  04/02/03     /  /      Pulver Roofing Company              
                                                            GC2-RRW2        4,033                  02/22/05   04/15/05    Pulver Roofing Co                   
 
01-0556   Reconstruction               0-010-005  04/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            007             3,447                  08/31/04   02/14/05    Edgebrrok Construction Companu      
                                                            AD GC-12          345                  06/15/04   06/30/04    Edgebrook Construction              
                                                            AD GC-8         2,379                  06/15/04   06/25/04    Edgebrook Construction              
                                                            AD GC20           725                  06/09/04   06/14/04    Edgebrook Construction              
                                                            AD GC26        10,345                  08/31/04   04/15/05    Edgebrrok Construction Co           
                                                            AD-H-1          1,695                  05/24/04   05/26/04    HJ Brandeles                        
 
00-0402   Reconstruction               0-010-006  04/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,969                  08/31/04   02/14/05    Edgebrrok Construction Co           
                                                            012             2,079                  08/31/04   02/14/05    Edgebrrok Construction Co           
                                                            017               156                  08/31/04   04/15/05    Edgebrook Construction Co           
                                                            AD GC-14        1,135                  06/09/04   06/22/04    Edgebrook Construction              
 
02-1318   Reconstruction               0-010-007  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0256   Additions and Alterations    0-010-008  01/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            000001          3,876                  11/20/13   12/24/13    Edgebrook Construction              
                                                            0000017         3,602                  03/11/14   04/04/14    Giruzzi Plumbing & Heating, Inc.    
                                                            0000076         2,998                  11/20/13   12/17/13    George A. Nole & Son, Inc.          
                                                            00001           1,359                  12/07/11   07/16/12    PULVER ROOFING COMPANY INC          
                                                            00003          11,432                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00003          10,153                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00004           3,864                  06/29/11   08/05/11    GIRUZZI PLUMBING & HEATING INC      
                                                            00004           5,472                  02/06/13   05/02/13    PULVER ROOFING COMPANY INC          
                                                            00005           6,825                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00005             441                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00005           1,824                  06/29/11   07/18/11    GIRUZZI PLUMBING & HEATING INC      
                                                            00005           4,370                  06/29/11   07/18/11    GIRUZZI PLUMBING & HEATING INC      
                                                            00005           5,946                  03/26/13   06/17/13    PULVER ROOFING COMPANY INC          
                                                            00006          10,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00006          10,000                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00006           5,218                  06/29/11   07/18/11    GIRUZZI PLUMBING & HEATING INC      
                                                            00007          39,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00007          13,643                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00007           1,935                  06/29/11   07/18/11    GIRUZZI PLUMBING & HEATING INC      
                                                            00008          28,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00009          10,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00009          12,353                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00009           1,931                  02/06/13   02/14/14    GIRUZZI PLUMBING & HEATING INC      
                                                            00010           6,065                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00011          25,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00011          12,495                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00011           1,020             150  02/06/13   02/14/14    GIRUZZI PLUMBING & HEATING INC      
                                                            00011           1,020             150  03/26/13   02/21/14    GIRUZZI PLUMBING & HEATING INC      
                                                            00012          15,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00012             981                  02/06/13   02/14/14    GIRUZZI PLUMBING & HEATING INC      
                                                            00013           5,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00013           5,000                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00014           6,378                  02/06/13   02/14/14    GIRUZZI PLUMBING & HEATING INC      
                                                            00016          53,755                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00016           3,592                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00017          18,107                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00017             215                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00018           7,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00019           1,368                  04/19/11   05/12/11    BAGNALL ELECTRIC INC                
                                                            00020           3,000                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00021           1,511                  04/19/11   05/17/11    GEORGE A NOLE & SON INC             
                                                            00021             769                  04/27/11   05/16/11    BAGNALL ELECTRIC INC                
                                                            00022             809                  04/27/11   05/16/11    BAGNALL ELECTRIC INC                
                                                            00023           3,067                  04/19/11   05/12/11    GEORGE A NOLE & SON INC             
                                                            00023          11,593                  04/27/11   05/16/11    BAGNALL ELECTRIC INC                
                                                            00024           1,632                  04/27/11   05/16/11    BAGNALL ELECTRIC INC                
                                                            00024          10,334                  06/29/11   08/05/11    GEORGE A NOLE & SON INC             
                                                            00025           2,356                  06/29/11   07/18/11    GEORGE A NOLE & SON INC             
                                                            00026           2,356                  06/29/11   07/18/11    GEORGE A NOLE & SON INC             
                                                            00027           1,008                  06/29/11   07/18/11    GEORGE A NOLE & SON INC             
                                                            00028          10,000                  04/27/11   05/16/11    BAGNALL ELECTRIC INC                
                                                            00028             420                  06/29/11   07/18/11    GEORGE A NOLE & SON INC             
                                                            00029           5,009                  04/27/11     /  /      BAGNALL ELECTRIC INC                
                                                            00030           2,415                  06/29/11   07/18/11    GEORGE A NOLE & SON INC             
                                                            00031         -48,362                  06/29/11   07/18/11    GEORGE A NOLE & SON INC             
                                                            00033             735                  09/22/11   11/04/11    GEORGE A NOLE & SON INC             
                                                            00034           1,821                  04/27/11   05/16/11    BAGNALL ELECTRIC INC                
                                                            00034           6,563                  09/22/11   11/04/11    GEORGE A NOLE & SON INC             
                                                            00034           6,563                  09/22/11     /  /      GEORGE A NOLE & SON INC             
                                                            00037             796                  06/29/11   07/18/11    BAGNALL ELECTRIC INC                
                                                            00037          70,000                  09/22/11   11/04/11    GEORGE A NOLE & SON INC             
                                                            00039             779                  06/29/11   07/18/11    BAGNALL ELECTRIC INC                
                                                            00040             680                  06/29/11   07/18/11    BAGNALL ELECTRIC INC                
                                                            00040      -1,005,156                  03/26/13   06/19/13    GEORGE A NOLE & SON INC             
                                                            00041             816                  06/29/11   07/18/11    BAGNALL ELECTRIC INC                
                                                            00042          24,783                  12/07/11   07/12/12    GEORGE A. NOLE & SON,INC.           
                                                            00046           8,839                  12/07/11   02/23/12    GEORGE A. NOLE & SON,INC.           
                                                            00047           3,973                  12/07/11   02/23/12    GEORGE A. NOLE & SON,INC.           
                                                            00048          20,119                  12/07/11   03/16/12    GEORGE A. NOLE & SON,INC.           
                                                            00050             173                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00051             481                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00052             523                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00053             800             120  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00053           1,394                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00054           1,842             276  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00054             812                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00055             639                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00056           6,302                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00058           1,339                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00058             566                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00059           2,037                  03/02/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00059           3,272                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00060           1,622                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00061           2,041                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00062           2,595                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00065           2,072                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00067           6,946                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00070             882                  03/02/12   07/20/12    GEORGE A NOLE & SON INC             
                                                            00071           5,285                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00075           5,293                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00076           1,668                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00076           2,998                  02/06/13   05/02/13    GEORGE A NOLE & SON INC             
                                                            00077           3,905                  10/26/11   08/28/12    BAGNALL ELECTRIC INC                
                                                            00079             400                  10/26/11   05/15/12    BAGNALL ELECTRIC INC                
                                                            00079           1,394                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00081             229                  12/07/11   02/07/13    GEORGE A. NOLE & SON,INC.           
                                                            00081             211                  02/06/13   05/17/13    GEORGE A NOLE & SON INC             
                                                            00083             816                  12/07/11   03/06/13    BAGNALL ELECTRIC INC                
                                                            00089           1,405                  03/26/13   06/17/13    GEORGE A NOLE & SON INC             
                                                            00091           2,321                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00092           7,450                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00095           1,861                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00096           1,337                  02/06/13   05/01/13    George A Nole & Son Inc             
                                                            00098             582                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00100           1,217                  03/02/12   07/24/13    BAGNALL ELECTRIC INC                
                                                            00100             582                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00101           2,018                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00102           1,465                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00105         -16,905                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00107          -2,000                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00108            -789                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00109          -1,176                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00116           1,576                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00117            -600                  02/06/13   05/01/13    GEORGE A NOLE & SON INC             
                                                            00122         174,678                  03/26/13   06/19/13    GEORGE A NOLE & SON INC             
                                                            112             6,968                  11/20/13   06/10/14    Bagnall Electric Inc.               
                                                            124             3,597                  11/20/13   12/17/13    George A. Nole & Son, Inc.          
                                                            127             2,566                  11/20/13   12/17/13    George A. Nole & Son, Inc.          
                                                            129              -775                  11/20/13   12/17/13    George A. Nole & Son, Inc.          
 
02-1844SC Visual Structural Inspection 0-010-SC1  04/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hugh R. Jones School:
90-1100   Reconstruction               0-011-002  03/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0120   Reconstruction               0-011-004  08/14/97  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1          259,579                  04/02/03     /  /      Pulver Roofing Company              
                                                            GC-1           10,779                  01/07/05   04/15/05    Pulver Roofing Co                   
                                                            GC1-SW1         6,000                  01/19/05   04/15/05    George Nole and Sons                
 
00-1082   Reconstruction               0-011-005  05/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            004             7,649                  08/31/04   02/14/05    Park City builders                  
                                                            011            -3,079                  08/31/04   02/14/05    Park City Builders                  
                                                            023               568                  01/31/05   03/18/05    Turner Construction                 
                                                            AD GC-11          431                  06/17/04   06/22/04    Park City Builders                  
                                                            AD GC-16       15,218                  06/18/04   06/28/04    Park City Builders                  
                                                            AD GC-31          994                  08/31/04   02/14/05    Park City Builders                  
                                                            AD GC-65       -3,981                  08/31/04   02/14/05    Park City builders                  
                                                            AD GC-7         1,817                  06/17/04   06/22/04    Park City Builders                  
                                                            AD H1           3,229                  08/31/04   02/14/05    HJ Brandeles Corp                   
                                                            AD-GC-22          336                  06/18/04   06/22/04    Park City Builders                  
                                                            AD-GC63          -400                  08/31/04   02/14/05    Park City Builders                  
                                                            Ad GC48         3,254                  08/31/04   02/14/05    Park City Builders                  
 
00-0249   Reconstruction               0-011-006  03/03/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD GC-57        7,502                  08/31/04   02/14/05    Park City Builders                  
                                                            AD GC-73        1,533                  10/28/04     /  /      Park City Builders                  
                                                            AD GC-74            0                  10/28/04     /  /      Park City Builders                  
                                                            AD GC60        -1,048                  08/31/04   02/14/05    Park City Builders                  
                                                            AD P6             260                  08/31/04   02/14/05    HJ Brandeles Corp                   
                                                            ad GC-47        1,545                  08/31/04   02/14/05    Park City Builders                  
 
02-1319   Reconstruction               0-011-007  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0590   Reconstruction               0-011-008  04/24/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00010           4,393                  08/14/15   08/26/15    Schmalz Mechanical Contractors, Inc.
                                                            00012          -3,255                  08/14/15   08/26/15    H.J. Brandeles                      
                                                            00013           5,769                  10/19/15   11/19/15    H.J. Brandeles                      
                                                            00020             669                  07/30/15   08/21/15    Ridley Electric                     
                                                            00034           2,278                  08/14/15   08/26/15    Ridley Electric                     
                                                            00035             403                  08/14/15   08/26/15    Ridley Electric                     
                                                            00037          13,545                  08/14/15   08/26/15    Edgebrook Construction              
                                                            00039           4,039                  08/14/15   08/26/15    Edgebrook Construction              
                                                            00040           3,710                  08/14/15   08/26/15    Edgebrook Construction              
                                                            00040           1,319                  10/19/15   11/19/15    Ridley Electric                     
                                                            00044           6,591                  08/14/15   08/26/15    Edgebrook Construction              
                                                            00045          -3,768                  10/19/15   11/19/15    Edgebrook Construction              
                                                            00045           3,030                  10/19/15   11/19/15    Ridley Electric                     
                                                            00047           3,895                  10/19/15   11/19/15    Edgebrook Construction              
                                                            00048          -1,689                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00049          -1,862                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00051           3,189                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00052             953                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00054             524                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00058           4,839                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00059           3,247                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00060           1,260                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            00061           1,574                  01/25/16   02/04/16    EDGEBROOK CONSTRUCTION              
                                                            1              76,000                  09/08/15   09/18/15    Edgebrook Construction              
                                                            1              -1,000                  09/08/15   09/18/15    Ridley Electric                     
                                                            1                   0                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            10              2,440                  06/29/15   07/22/15    HJ Brandeles                        
                                                            10              2,007                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            11             12,637                  03/27/15   04/02/15    Edgebrook Construction              
                                                            11              3,040                  06/29/16   07/27/16    Titan Roofing Inc.                  
                                                            12             -3,600                  06/29/16   07/27/16    Titan Roofing Inc.                  
                                                            13              7,047                  03/27/15   04/02/15    Edgebrook Construction              
                                                            14            -11,847                  04/01/15   04/08/15    Edgebrook Construction              
                                                            14                464                  09/08/15   09/18/15    Ridley Electric                     
                                                            14              3,956                  01/25/16   02/04/16    Schmalz Mechanical Contractors, Inc.
                                                            15              5,200                  04/01/15   04/08/15    Edgebrook Construction              
                                                            16              1,058                  04/01/15   04/08/15    Edgebrook Construction              
                                                            17              3,330                  04/01/15   04/08/15    Edgebrook Construction              
                                                            18             -2,480                  04/01/15   04/08/15    Edgebrook Construction              
                                                            18              1,884                  09/08/15   09/18/15    Ridley Electric                     
                                                            2             110,680                  09/08/15   09/18/15    Schmalz Mechanical Contractors Inc. 
                                                            2               1,832                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            21               -700                  06/08/15   06/17/15    Ridley Electric                     
                                                            23              5,283                  06/08/15   06/17/15    Ridley Electric                     
                                                            24               -493                  05/05/15   05/29/15    Edgebrook Construction              
                                                            25             -1,053                  06/08/15   06/17/15    Ridley Electric                     
                                                            26              1,621                  06/08/15   06/17/15    Edgebrook Construction              
                                                            27              5,594                  06/08/15   06/17/15    Edgebrook Construction              
                                                            28              1,789                  06/08/15   06/17/15    Edgebrook Construction              
                                                            29              1,018                  06/29/15   07/22/15    Ridley Electric                     
                                                            3              21,000                  09/08/15   09/18/15    HJ Brandeles                        
                                                            3              90,400                  09/08/15   09/18/15    Schmalz Mechanical Contractors Inc. 
                                                            3               2,285                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            30                729                  06/29/15   07/22/15    Ridley Electric                     
                                                            31              1,116                  06/08/15   06/17/15    Edgebrook Construction              
                                                            31              4,588                  06/29/15   07/22/15    Ridley Electric                     
                                                            32             -3,800                  06/29/15   07/22/15    Ridley Electric                     
                                                            35              3,028                  06/29/15   07/30/15    Edgebrook Construction              
                                                            4                -399                  03/27/15   04/02/15    Schmalz Mechanical Contractors, Inc.
                                                            4               1,010                  09/08/15   09/18/15    HJ Brandeles                        
                                                            4              13,000                  09/08/15   09/18/15    Ridley Electric                     
                                                            4               1,500                  06/29/16   10/05/16    Titan & Roofing, Inc.               
                                                            46                197                  01/25/16   02/04/16    Ridley Electric                     
                                                            48                354                  03/31/16   04/12/16    Ridley Electric                     
                                                            49              1,627                  03/31/16   04/12/16    Ridley Electric                     
                                                            5               6,451                  04/01/15   04/08/15    Schmalz Mechanical Contractors, Inc.
                                                            5                 621                  09/08/15   09/18/15    HJ Brandeles                        
                                                            5               4,953                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            6               4,300                  09/08/15   09/18/15    Edgebrook Construction              
                                                            6              40,000                  09/08/15   09/18/15    Ridley Electric                     
                                                            6              25,000                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            63              1,616                  03/31/16   04/12/16    Edgebrook Construction              
                                                            64                953                  03/31/16   04/12/16    Edgebrook Construction              
                                                            67             -7,732                  03/31/16   04/12/16    Edgebrook Construction              
                                                            68               -953                  03/31/16   04/12/16    Edgebrook Construction              
                                                            7                 602                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            71              8,039                  03/31/16   04/12/16    Edgebrook Construction              
                                                            72                377                  03/31/16   04/18/16    Edgebrook Construction              
                                                            75               -578                  07/05/16   10/07/16    Edgebrook Construction              
                                                            76              1,028                  07/04/16   07/27/16    Edgebrook Construction              
                                                            8               4,617                  06/18/15   07/07/15    HJ Brandeles                        
                                                            8               1,068                  06/29/15   07/22/15    Schmalz Mechanical Contractors, Inc.
                                                            8             157,000                  09/08/15   09/18/15    Edgebrook Construction              
                                                            8               3,000                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            9             -12,897                  03/27/15   04/02/15    Edgebrook Construction              
                                                            9              -6,120                  03/27/15   04/02/15    Ridley Electric                     
                                                            9                 682                  06/18/15   03/03/17    HJ Brandeles                        
                                                            9                -700                  06/29/16   10/05/16    Titan Roofing Inc.                  
                                                            GC-19b          1,203                  04/26/17   05/02/17    Edgebrook Construction              
 
21-1182FC Reconstruction               0-011-011  02/18/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1843SC Visual Structural Inspection 0-011-SC1  04/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXKemble Street Sch-TranfToUticaCity:
95-0561   Reconstruction               0-012-001  01/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Kernan School:
98-0073   Reconstruction               0-013-003  09/18/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           41,664                  01/07/05   04/15/05    Horizon Roofing Sheet Metal         
                                                            GC1-RRW1       41,664                  04/02/03     /  /      Horizon Roofing & Sheet Metal       
                                                            GC1-SW-1       13,200          13,200  04/02/03   Disapproved George A. Nole & Sons               
 
01-0804   Reconstruction               0-013-004  11/12/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            22,703                  08/31/04   02/14/05    Park City Builders                  
                                                            008            14,254                  08/31/04   02/14/05    Park City Builders                  
                                                            021            -8,735                  01/31/05   02/08/05    Turner Construction                 
                                                            028            -4,260                  05/05/05   06/21/05    Park City Builders of NY            
                                                            AD GC24         3,902                  08/31/04   12/28/04    Park City Builders                  
                                                            ADGC-50         7,621                  08/31/04   02/14/05    Park City Builders                  
                                                            GC-29           7,972                  06/18/04   06/25/04    Park City Builders                  
                                                            GC-37           3,100                  06/18/04   06/25/04    Park City Builders                  
                                                            GC-77           6,442                  05/05/05     /  /      Park City Builders                  
                                                            ad GC-14        5,644                  06/17/04   06/25/04    Park City Builders                  
                                                            ad GC-30        6,777                  08/31/04   02/14/05    Park City builders                  
 
01-1201   Reconstruction               0-013-005  10/29/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            14,499                  08/31/04   02/14/05    Park City Builders                  
                                                            012           -13,029                  08/31/04   04/15/05    Park City Builders                  
                                                            AD GC-58        9,340                  08/31/04   02/14/05    Park City Builders                  
                                                            AD GC-72        1,056                  10/28/04   12/17/04    Park City Builders                  
                                                            AD GC8          6,252                  08/31/04   02/14/05    Park City Builders                  
                                                            AD P7           1,283                  08/31/04   02/14/05    HJ Brandeles                        
                                                            AD-GC-10        6,575                  06/17/04   06/25/04    Park City Builders                  
                                                            AD-GC-9         6,412                  06/17/04   06/25/04    Park City Builders                  
                                                            AD-P-2          7,249                  06/17/04   06/25/04    HJ Brandeles                        
 
02-1320   Reconstruction               0-013-006  06/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0570   Reconstruction               0-013-007  04/25/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           1,935                  01/25/16   02/04/16    SULLIVAN CONTRACTING, INC           
                                                            00003             525                  08/14/15   08/26/15    Ridley Electric                     
                                                            00003           3,419                  10/19/15   11/19/15    Utica Glass Company                 
                                                            00004           5,031                  08/14/15   08/26/15    Diamond Roofing Co., Inc.           
                                                            00005           2,952                  08/14/15   08/26/15    Diamond Roofing Co., Inc.           
                                                            00023          -1,740                  08/14/15   08/26/15    National Building & Restoration Corp
                                                            00024           5,577                  08/14/15   08/26/15    National Building & Restoration Corp
                                                            00025           5,282                  10/19/15   11/19/15    National Building & Restoration Corp
                                                            00026           3,410                  10/19/15   11/19/15    National Building & Restoration Corp
                                                            00027           2,912                  10/19/15   11/19/15    National Building & Restoration Corp
                                                            00028          22,630                  01/25/16   02/04/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00029         -12,990                  01/25/16   02/04/16    NATIONAL BUILDING & RESTORATOIN CORP
                                                            00030           1,730                  01/25/16   02/04/16    NATIONAL BUILDING & RESTORATION CORP
                                                            00031         -33,822                  01/25/16   02/04/16    NATIONAL BUILDING & RESTORATION CORP
                                                            1               8,971                  06/30/14   08/24/16    Sullivan Contracting, Inc.          
                                                            1            -212,691                  02/04/15   02/06/15    WCA Roofing                         
                                                            1               1,557                  02/04/15   02/06/15    Schmalz Mechanical Contractors, Inc.
                                                            1             107,150                  03/13/15   03/31/15    Diamond Roofing Co., Inc.           
                                                            1                   0                  05/26/15   06/18/15    Ridley Electric Company             
                                                            1              18,771                  09/08/15   09/18/15    National Building & Restoration Corp
                                                            1                   0                  09/08/15   09/18/15    Ridley Electric Corporation         
                                                            10              1,888                  04/01/15   04/08/15    National Building & Restoration Corp
                                                            11              6,676                  04/01/15   04/08/15    National Building & Restoration Corp
                                                            12             13,293                  03/31/16   04/12/16    National Building & Restoration Corp
                                                            13              3,961                  03/31/16   04/12/16    National Building & Restoration Corp
                                                            14              1,961                  05/15/15   06/18/15    National Building & Restoration Corp
                                                            15                748                  06/08/15   06/17/15    National Building & Restoration Corp
                                                            16              1,099                  06/08/15   06/17/15    National Building & Restoration Corp
                                                            17              2,434                  06/08/15   06/17/15    National Building & Restoration Corp
                                                            18                689                  06/08/15   06/17/15    National Building & Restoration Corp
                                                            19              3,012                  06/12/15   07/03/15    National Building & Restoration     
                                                            2               2,577                  05/05/15   05/29/15    Utica Glass Company                 
                                                            2              13,228                  05/22/15   06/18/15    National Building & Restoration Corp
                                                            2                   0                  09/08/15   09/18/15    Diamond Roofing Co. Inc.            
                                                            2                   0                  09/08/15   09/18/15    Schmalz Mechanical Contractors Inc. 
                                                            2               2,342                  03/31/16   04/12/16    Ridley Electric Company             
                                                            20              2,752                  06/12/15   07/03/15    National Building & Restoration     
                                                            21                893                  06/12/15   07/03/15    National Building & Restoration     
                                                            22              1,723                  07/13/15   08/24/16    National Building & Restoration Corp
                                                            3              10,622                  02/04/15   02/06/15    Diamond Roofing Co., Inc.           
                                                            3               1,480                  02/04/15   02/06/15    Schmalz Mechanical Contractors, Inc.
                                                            3               3,983                  05/22/15   06/18/15    National Building & Restoration Corp
                                                            32              3,229                  03/31/16   04/12/16    National Building & Restoration Corp
                                                            3a             -4,518                  03/31/16   04/12/16    Ridley Electric Company             
                                                            4                 480                  02/04/15   02/06/15    Schmalz Mechanical Contractors, Inc.
                                                            4               5,878                  05/22/15   06/18/15    National Building & Restoration Corp
                                                            4               3,020                  07/13/15   08/11/15    Ridley Electric Company             
                                                            5               3,104                  04/01/15   04/08/15    Schmalz Mechanical Contractors, Inc.
                                                            5               4,825                  05/22/15   06/18/15    National Building & Restoration Corp
                                                            5              32,098                  07/13/15   08/24/16    Rildey Electric Company             
                                                            6               8,321                  05/15/15   06/18/15    Schmaltz Mechanical Contractors, Inc
                                                            6                   0                  05/22/15   06/18/15    National Building & Restoration Corp
                                                            7               3,009                  05/15/15   08/24/16    echmalz Mechanical Contractors, Inc.
                                                            7               1,205                  05/22/15   06/18/15    National Building & Restoration Corp
                                                            8                 912                  05/12/15   06/18/15    National Building & Restoration Corp
                                                            9               6,262                  05/12/15   06/18/15    National Building & Restoration Corp
 
15-1674   Additions and Alterations    0-013-011  11/03/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -1,204                  10/26/17   11/30/17    Patricia Electric Inc.              
                                                            EC-02           2,058                  03/15/18   03/29/18    Patricia Electric Inc.              
                                                            EC-03           4,051                  03/15/18   03/29/18    Patricia Electric Inc.              
                                                            EC-04           5,209                  03/15/18   03/29/18    Patricia Electric Inc.              
                                                            EC-07           3,107                  12/10/18   01/23/19    PATRICIA ELECTRIC INC.              
                                                            EC-08           9,322                  12/10/18   01/23/19    PATRICIA ELECTRIC INC.              
                                                            EC-09           9,393                  12/10/18   01/23/19    PATRICIA ELECTRIC INC.              
                                                            EC-10           5,659                  12/10/18   01/23/19    PATRICIA ELECTRIC INC.              
                                                            EC-11           1,564                  01/17/19   02/08/19    PATRICIA ELECTRIC INC.              
                                                            EC-12           6,313                  01/17/19   02/08/19    PATRICIA ELECTRIC INC.              
                                                            EC-13           4,645                  01/17/19   02/08/19    PATRICIA ELECTRIC INC.              
                                                            EC-14           4,332                  01/17/19   02/08/19    PATRICIA ELECTRIC INC.              
                                                            EC-15           5,530                  01/17/19   02/08/19    PATRICIA ELECTRIC INC.              
                                                            EC-16           1,340                  10/16/20   12/29/20    PATRICIA ELECTRIC, INC.             
                                                            EC05              412                  06/04/18   06/29/18    PATRICIA ELECTRIC INC               
                                                            EC06            3,095                  06/04/18   06/28/18    PATRICIA ELECTRIC INC               
                                                            GC-01           1,097                  10/26/17   11/10/17    Murnane Building Contractors, Inc.  
                                                            GC-02             987                  10/26/17   11/10/17    Murnane Building Contractors, Inc.  
                                                            GC-03           5,994                  10/26/17   11/30/17    Murnane Building Contractors, Inc.  
                                                            GC-04           3,070                  10/26/17   11/10/17    Murnane Building Contractors        
                                                            GC-05          24,488                  10/26/17   11/10/17    Murnane Building Contractors, Inc.  
                                                            GC-06           5,744                  10/26/17   11/10/17    Murnane Building Contractors, Inc.  
                                                            GC-07          -2,588                  10/26/17   11/10/17    Murnane Building Contractors, Inc.  
                                                            GC-08          13,256                  10/26/17   11/10/17    Murnane Building Contractors, Inc.  
                                                            GC-09           9,483                  10/26/17   11/10/17    Murnane Building Contractors, Inc.  
                                                            GC-10           6,570                  10/26/17   11/30/17    Murnane Building Contractors, Inc.  
                                                            GC-11           3,153                  03/15/18   03/20/18    Murnane Building Contractors, Inc.  
                                                            GC-12          19,127                  03/15/18   03/20/18    Murnane Building Contractors, Inc.  
                                                            GC-13            -391                  03/15/18   03/20/18    Murnane Building Contractors, Inc.  
                                                            GC-14          19,309                  03/15/18   03/20/18    Murnane Building Contractors, Inc.  
                                                            GC-22           7,432                  12/10/18   01/22/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-23          12,856                  12/10/18   01/22/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-24           3,308                  12/10/18   01/22/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-25           2,596                  12/10/18   01/22/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-26           8,287                  12/10/18   01/22/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-27         -14,728                  12/10/18   01/18/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-28           2,536                  12/10/18   01/18/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-29           7,483                  12/10/18   01/18/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-30          -8,860                  12/10/18   01/18/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-31           5,039                  12/10/18   01/18/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-32           2,442                  01/17/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-33          -7,882                  01/17/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-34          -1,194                  01/17/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-35           6,968                  01/17/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-36           9,505                  01/17/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-37           2,129                  01/17/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-38           1,610                  01/17/19   02/11/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-39           2,111                  05/17/19   06/05/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-40           8,589                  05/17/19   06/05/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-41           8,621                  05/17/19   06/05/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-42           3,270                  05/17/19   06/05/19    MURNANE BUILDING CONTRACTORS, INC.  
                                                            GC-43           2,725                  05/17/19   06/05/19