COPENHAGEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 23-02-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
92-0017   Reconstruction               0-001-005  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0018   Reconstruction               0-001-006  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0165   Reconstruction               0-001-007  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0098   Reconstruction               0-001-008  08/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1363   Reconstruction               0-001-009  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1289   Reconstruction               0-001-010  07/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1689   Additions and Alterations    0-001-012  01/11/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-1            44,781                  11/06/02   01/10/03    Barber Corp                         
                                                            1-2            11,822                  08/05/03   08/14/03    Barber Corp                         
                                                            1-3             2,860                  10/03/03   10/07/03    Barber Corp                         
                                                            11-1            5,504                  06/11/08   08/05/08    M & N PLUMBING & HEATING            
                                                            12-1            4,412                  05/06/03   05/07/03    Cardinal Const.                     
                                                            12-2             -181                  12/22/03   12/26/03    Cardinal Const.                     
                                                            2-1             4,375                  09/20/02   10/24/02    Clean Air Technology                
                                                            3-1             6,946                  10/11/02   11/06/02    Barber Corp                         
                                                            3-2            17,875                  10/11/02   11/06/02    Barber Corp                         
                                                            3-3            16,879                  06/30/03   07/09/03    Barber Corp                         
                                                            3-4             1,875                  12/22/03   12/26/03    Barber Corp                         
                                                            6-1             3,782                  05/06/03   05/07/03    Delhi Steel                         
                                                            6-2             1,120                  05/06/03   05/07/03    Delhi Steel                         
                                                            8-1            -4,000                  09/25/02   10/24/02    Western NY Floor Co.                
                                                            9-1             1,816                  09/25/02   10/24/02    E&B Equip.                          
                                                            9-2             3,781                  08/05/03   08/14/03    E&B Equip.                          
 
05-1412   Reconstruction               0-001-013  10/04/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,769                  07/16/07   08/07/07    Johnson Howard Associates           
                                                            GC-001          6,510                  05/29/07   06/18/07    Con Tech Building Systems           
                                                            GC-002          4,400                  10/31/07   11/14/07    CON TECH BUILDING SYSTEMS INC       
                                                            GC-003          4,000                  10/31/07   11/14/07    CON TECH BULDING SYSTEMS INC        
                                                            GC-004          6,577                  10/31/07   11/14/07    CON TECH BUILDING SYSTEMS INC       
                                                            GC-005         24,381                  08/27/08     /  /      Con Tech Bulding Systems, Inc.      
                                                            GC-006         10,800                  08/27/08     /  /      Con Tech Building Systems, Inc.     
                                                            GC-007         10,000                  08/27/08     /  /      Con Tech Building Systems, Inc.     
                                                            MAS - 04        2,200                  09/04/07   01/15/08    HOPKINS & REILLY MASON CONTRACTORS I
                                                            MAS-001        18,400                  05/29/07   06/18/07    Hopkins Reilly Mason Contractors    
                                                            MAS-002        16,100                  05/29/07   06/18/07    Hopkins Reilly Mason Contractors    
                                                            MAS-006        10,308                  10/31/07   11/14/07    HOPKINS & REILLY MASON CONTRACTORS  
                                                            MAS-008         4,336                  12/24/07   01/07/08    HOPKINS & REILLY MASON CONTRACTORS  
                                                            Mas-003        28,323                  07/12/07   07/17/07    Hopkins and Reilly Mason            
                                                            Win-002         3,565                  07/12/07   07/17/07    Johnson Howard Associates           
 
09-1137   Reconstruction               0-001-014  08/26/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ELEC-001            0                  04/01/11   04/29/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-002            0                  04/01/11   04/29/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-003            0                  04/01/11   04/29/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-004            0                  04/05/11   04/29/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-005            0                  06/20/11   07/21/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-006        1,712                  06/20/11   07/21/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-007      -30,000                  06/20/11   07/21/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-008      -42,500                  06/20/11   07/21/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-009        1,412                  06/13/11   07/21/11    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-010        4,873                  09/20/11   05/15/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-011        2,958                  09/20/11   05/15/12    COLLINS-HAMMOND ELECT CONT INC      
                                                            ELEC-012        7,238                  09/20/11   05/15/12    COLLINS-HAMMOND ELECT CONT INC      
                                                            ELEC-013        4,190                  09/20/11   05/15/12    COLLINS-HAMMOND ELECT CONT INC      
                                                            ELEC-014        3,851                  10/13/11   05/15/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-015         -300                  10/13/11   05/15/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-016        3,933                  10/13/11   05/15/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-017        1,609                  10/13/11   05/15/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-018        1,936                  11/14/11   05/15/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-019        3,496                  11/28/11   04/05/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-020          349                  12/07/11   05/15/12    COLLINS-HAMMMOND ELECTRICAL         
                                                            ELEC-021          917                  12/07/11   05/15/12    COLLINS-HAMMOND ELECTRIAL           
                                                            ELEC-022        4,868                  12/07/11   05/15/12    COLLINS-HAMMOND ELECTRICAL          
                                                            ELEC-024        1,694                  01/23/12   05/08/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-025        1,491                  02/14/12   09/18/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-026        1,557                  02/14/12   09/07/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-027        3,260                  02/14/12   09/07/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-028          523                  03/14/12   08/06/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-029          310                  04/11/12   10/05/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-030            0                  04/05/12   10/05/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-031         -320                  07/16/12   11/20/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-032        4,900                  07/16/12   11/20/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-033          598                  07/16/12   11/20/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-034         -853                  08/20/12   12/07/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            ELEC-23        -1,788                  01/23/12   05/08/12    COLLINS-HAMMOND ELECTRICAL CONT INC 
                                                            GC-001              0                  02/16/11   03/10/11    BETTE & CRING LLC                   
                                                            GC-003              0                  03/15/11   04/01/11    BETTE & CRING LLC                   
                                                            GC-004              0                  03/15/11   04/01/11    BETTE & CRING LLC                   
                                                            GC-005              0                  03/15/11   04/01/11    BETTE & CRING LLC                   
                                                            GC-006              0                  04/05/11   04/29/11    BETTE & CRING LLC                   
                                                            GC-007              0                  04/18/11   05/10/11    BETTE & CRING LLC                   
                                                            GC-008              0                  05/17/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-009              0                  05/17/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-010          2,521                  05/17/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-011          3,571                  05/17/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-012          4,133                  05/17/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-013            531                  05/17/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-014          5,434                  05/27/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-015           -480                  06/13/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-016          1,349                  06/13/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-017          2,254                  06/20/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-018         12,689                  06/20/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-019          2,934                  06/21/11   07/21/11    BETTE & CRING LLC                   
                                                            GC-020         13,268                  07/19/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-021           -688                  07/14/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-022          1,377                  07/14/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-023        157,859                  08/02/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-024        123,881                  08/02/11   09/06/11    BETTE & CRING LLC                   
                                                            GC-025            575                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-026            385                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-027          3,027                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-028         12,624                  08/02/11   09/02/11    BETTE & CRING, LLC                  
                                                            GC-029            366                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-030          1,034                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-031          5,269                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-032          1,306                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-033          1,185                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-034          3,616                  07/25/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-035          8,397                  07/29/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-036          6,615                  07/29/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-037         12,997                  08/02/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-038         12,351                  08/02/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-039         -5,397                  07/29/11   09/02/11    BETTE & CRING LLC                   
                                                            GC-040          1,265                  08/12/11   09/07/11    BETTE & CRING LLC                   
                                                            GC-041          3,263                  08/17/11   09/07/11    BETTE & CRING LLC                   
                                                            GC-042            823                  09/02/11   09/23/11    BETTE & CRING LLC                   
                                                            GC-043         77,219                  09/02/11   10/05/11    BETTE & CRING LLC                   
                                                            GC-044          2,981                  09/02/11   09/23/11    BETTE & CRING LLC                   
                                                            GC-045          1,504                  09/02/11   09/23/11    BETTE & CRING LLC                   
                                                            GC-046            715                  09/02/11   09/23/11    BETTE & CRING LLC                   
                                                            GC-047          9,644                  09/20/11   12/20/11    BETTE & CRING LLC                   
                                                            GC-048            866                  09/20/11   12/20/11    BETTE & CRING LLC                   
                                                            GC-049          1,088                  09/20/11   12/20/11    BETTE & CRING LLC                   
                                                            GC-050          1,648                  09/20/11   12/20/11    BETTE & CRING LLC                   
                                                            GC-051          1,181                  09/20/11   12/20/11    BETTE & CRING LLC                   
                                                            GC-052          5,664                  10/13/11   12/20/11    BETTE & CRING LLC                   
                                                            GC-053          1,895                  10/13/11   12/20/11    BETTE & CRING LLC                   
                                                            GC-054          4,984                  10/27/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-055         16,641                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-056          9,017                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-057          8,260                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-058          6,242                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-059            462                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-060          1,523                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-061          2,205                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-062            985                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-063         22,820                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-064          4,884                  11/04/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-065          8,535                  11/14/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-066          4,659                  11/14/11   01/24/12    BETTE & CRING LLC                   
                                                            GC-067          7,418                  11/28/11   04/05/12    BETTE & CRING LLC                   
                                                            GC-068           -450                  11/29/11   04/05/12    BETTE & CRING LLC                   
                                                            GC-069          1,236                  11/29/11   04/05/12    BETTE & CRING LLC                   
                                                            GC-070          3,440                  11/29/11   04/05/12    BETTE & CRING LLC                   
                                                            GC-071          2,265                  12/16/11   04/05/12    BETTE & CRING LLC                   
                                                            GC-072          1,577                  11/29/11   04/05/12    BETTE & CRING LLC                   
                                                            GC-073            919                  11/29/11   04/05/12    BETTE & CRING LLC                   
                                                            GC-074          3,280                  12/07/11   04/05/12    BETTE&CRING,LLC                     
                                                            GC-075          3,575                  12/07/11   04/05/12    BETTE&CRING,LLC                     
                                                            GC-076          6,258                  12/12/11   08/31/12    BETTE & CRING LLC                   
                                                            GC-077          6,965                  12/12/11   08/31/12    BETTE & CRING LLC                   
                                                            GC-078            121                  12/28/11   05/08/12    Bette & Cring, LLC                  
                                                            GC-079          2,301                  02/01/12   04/20/12    BETTE & CRING LLC                   
                                                            GC-080          2,909                  12/28/11   04/27/12    Bette & Cring, LLC                  
                                                            GC-081          8,051                  12/28/11   04/27/12    Bette & Cring, LLC                  
                                                            GC-082          8,580                  12/28/11   04/27/12    Bette & Cring, LLC                  
                                                            GC-083          4,028                  12/28/11   04/27/12    Bette & Cring, LLC                  
                                                            GC-084          2,282                  12/28/11   04/27/12    Bette & Cring, LLC                  
                                                            GC-085          9,875                  01/19/12   04/06/12    BETTE & CRING LLC                   
                                                            GC-086          4,028                  02/01/12   04/20/12    BETTE & CRING LLC                   
                                                            GC-087         22,630                  02/02/12   04/20/12    BETTE & CRING LLC                   
                                                            GC-088          6,000                  02/29/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-089          5,671                  02/29/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-090              0                  03/22/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-091          8,509                  03/22/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-092         12,510                  04/05/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-093          9,002                  03/22/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-094           -320                  04/05/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-095          2,888                  04/12/12   08/31/12    BETTE & CRING LLC                   
                                                            GC-096          5,200                  05/25/12   10/23/12    BETTE & CRING LLC                   
                                                            GC-097            120                  06/14/12   11/13/12    BETTE & CRING LLC                   
                                                            GC-098          4,075                  06/14/12   11/13/12    BETTE & CRING LLC                   
                                                            GC-099            725                  06/14/12   11/13/12    BETTE & CRING LLC                   
                                                            GC-100            880                  11/19/12   03/08/13    BETTE & CRING LLC                   
                                                            HVAC-001            0                  04/05/11   04/29/11    BLACK RIVER PLUMBING HEATING & A/C  
                                                            HVAC-002            0                  04/05/11   04/29/11    BLACK RIVER PLUMB/HEAT/AC INC       
                                                            HVAC-003            0                  07/29/11   11/09/11    BLACK RIVER PLUMBING/HEATING/AC INC 
                                                            HVAC-004            0                  07/29/11   11/09/11    BLACK RIVER PLUMBING/HEATING/AC INC 
                                                            HVAC-006            0                  10/13/11   05/15/12    BLACK RIVER PLUMBING/HEATING/AC INC 
                                                            HVAC-007            0                  10/27/11   10/23/12    BLACK RIVER PLUMBING, HEATING & A/C 
                                                            HVAC-008            0                  10/27/11   05/14/12    BLACK RIVER PLUMBING, HEATING & A/C 
                                                            HVAC-009            0                  11/04/11   05/14/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-010            0                  12/07/11   05/15/12    BLACK RIVER PLUMBING HEATING & AC   
                                                            HVAC-011            0                  12/07/11   05/08/12    BLACK RIVER PLUMBING HEATING & AC   
                                                            HVAC-012        8,084                  03/08/12   07/31/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-013          578                  01/01/12   05/08/12    BLACK RIVER PLUMB/HEAT/AC INC       
                                                            HVAC-014          585                  01/23/12   05/08/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-015        5,518                  01/23/12   05/08/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-016        1,604                  01/23/12   05/08/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-017        9,235                  02/02/12   05/15/12    BLACK RIVER PLUMB HEAT & AC INC     
                                                            HVAC-018        3,836                  02/02/12   05/15/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-019      -14,379                  03/08/12   10/05/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-020        1,214                  03/08/12   07/31/12    BLACK RIVER PLUMB HEAT & A/C INC    
                                                            HVAC-021         -320                  04/12/12   08/22/12    BLACK RIVER PLUMBING HEATING & A/C  
                                                            HVAC-022        1,723                  04/12/12   08/22/12    BLACK RIVER PLUMBING HEATING & A/C  
                                                            HVAC-023        1,752                  05/25/12   10/24/12    BLACK RIVER PLUMBING HEATING & A/C  
                                                            HVAC-05             0                  09/20/11   05/15/12    BLACK RIVER PLUMBING, HEATING & A/C 
                                                            PC-001              0                  04/05/11   04/29/11    COMFORT SYSTEMS USA SYRACUSE INC    
                                                            PC-002              0                  11/04/11   05/14/12    COMFORT SYSTEMS USA SYRACUSE INC    
                                                            PC-003          4,072                  12/16/11   05/08/12    COMFORT SYSTEMS USA SYRACUSE INC    
                                                            PC-004          9,932                  11/04/11   05/14/12    COMFORT SYSTEMS USA SYRACUSE INC    
                                                            PC-005          6,673                  11/04/11   05/14/12    COMFORT SYSTEM USA SYRACUSE INC     
                                                            PC-006          9,664                  11/04/11   05/14/12    COMFORT SYSTEM USA SYRACUSE INC     
                                                            PC-007          3,951                  11/29/11   05/08/12    COMFORT SYSTEMS USA SYRACUSE        
                                                            PC-008            542                  11/29/11   05/08/12    COMFORT SYSTEMS USA SYRACUSE        
                                                            PC-009          1,560                  11/29/11   05/08/12    COMFORT SYSTEMS USA SYRACUSE        
                                                            PC-010          2,268                  11/29/11   05/08/12    COMFORT SYSTEMS USA SYRACUSE        
                                                            PC-011            779                  01/23/12   05/08/12    COMFORT SYSTEMS USA SYRACUSE INC    
                                                            PC-012           -320                  12/06/12   07/03/13    COMFORT SYSTEMS USA SYRACUSE INC    
                                                            PC-013         -2,559                  12/17/12   07/16/13    Comfort Systems USA Syracuse Inc    
                                                            ROOF-001       15,950                  01/09/12   04/27/12    PTL CONTRACTING CORP                
                                                            ROOF-002        1,320                  12/07/11   04/05/12    PTL CONTRACTING CORP.               
                                                            ROOF-003       29,700                  11/19/12   03/08/13    PTL CONTRACTING CORP                
                                                            SITE-002       30,300                  08/02/11   09/02/11    J.E. SHEEHAN CONTRACTING CORPORATION
                                                            SITE-003        8,398                  10/13/11   12/20/11    J.E. SHEEHAN CONTRACTING CORPORATION
                                                            SITE-004        8,478                  10/13/11   12/20/11    J.E. SHEEHAN CONTRACTING CORPORATION
                                                            SITE-005        9,603                  10/13/11   12/20/11    J.E. SHEEHAN CONTRACTING CORPORATION
                                                            SITE-006        9,109                  10/13/11   12/20/11    J.E. SHEEHAN CONTRACTING CORPORATION
                                                            SITE-007        9,110                  10/13/11   12/20/11    J.E. SHEEHAN CONTRACTING CORPORATION
                                                            SITE-008        8,491                  10/13/11   12/20/11    J.E. SHEEHAN CONTRACTING CORPORATION
                                                            SITE-009        9,934                  10/27/11   01/24/12    J.E. SHEEHAN CONTRACTING COMPANY    
                                                            SITE-010        7,440                  10/27/11   01/24/12    J.E. SHEEHAN CONTRACTING COMPANY    
                                                            SITE-011        9,953                  10/27/11   01/24/12    JE SHEEHAN CONTRACTING CORP         
                                                            SITE-012       14,788                  11/04/11   01/24/12    JE SHEEHAN CONTRACTING CORPORATION  
                                                            SITE-013         -834                  12/07/11   05/15/12    J.E.SHEEHAN CONTRACTING CORP        
                                                            SITE-014       39,000                  01/09/12   04/27/12    JE SHEEHAN CONTRACTING CORPORATION  
                                                            SITE-015        7,660                  05/25/12   10/23/12    J.E. SHEEHAN CONTRACTING CORPORATION
 
17-0239   Reconstruction               0-001-015  02/23/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0254   Reconstruction               0-001-016  01/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-GC-01            0                  12/29/21   01/06/23    Powis Contr Inc                     
                                                            AAEC-01             0                  12/29/21   10/18/22    Dow Elec                            
                                                            AAEC-02             0                  12/29/21   10/18/22    Dow Elec                            
                                                            EC-01            -121                  12/29/21   10/18/22    Dow Elec                            
                                                            GC-01          27,198                  12/29/21   01/06/23    powls Contr Inc                     
                                                            GC-02          12,345                  12/29/21   01/06/23    Powls Contr Inc                     
                                                            GC-03          10,903                  12/29/21   01/06/23    Powls Contr Inc                     
                                                            MC-03           8,411                  12/29/21   10/18/22    Ontario HVAC Solutions              
                                                            SC-02          -3,570                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-04           2,130                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-12           6,602                  12/29/21   01/06/23    Cunningham Excavation               
 
21-1981   Reconstruction               0-001-017  08/02/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2345   Reconstruction               0-001-018  07/17/23  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0099EP Energy Project               0-001-E01  08/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1277FP Reconstruction               0-001-FP1  03/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage (demolition 2020):
00-1690   Reconstruction               4-003-002  01/11/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            11-2            7,551                  04/15/08     /  /      M & N PLUMBING & HEATING            
 
19-1158   Reconstruction               4-003-004  01/22/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-0019   Reconstruction               5-002-002  08/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1290   Additions and Alterations    5-002-003  07/15/97  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1138   Reconstruction               5-002-005  08/26/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1909   Reconstruction               5-002-006  01/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0766   Reconstruction               5-002-007  02/08/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0255   Reconstruction               5-002-008  01/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAMC-01             0                  12/29/21   10/18/22    Ontario HVAC Solutions              
                                                            AAPC-01             0                  12/29/21   10/18/22    Ontario HVAC Solutions              
                                                            AASC-01             0                  12/29/21   01/06/23    Cunningham Excavation               
                                                            AASE-01             0                  12/29/21   10/18/22    Kahrs Const                         
                                                            GC-04           7,500                  12/29/21   01/06/23    Powis Contr Inc                     
                                                            MC-01             276                  12/29/21   10/18/22    Ontario HVAC Solutions              
                                                            MC-02            -460                  12/29/21   10/18/22    Ontario HVAC Solutions              
                                                            PC-01          -1,189                  12/29/21   10/18/22    Ontario HVAC Solutions              
                                                            SC-01          16,120                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-03           2,436                  12/29/21   01/06/23    Cunningham Excavation               
 

          Press Box:
19-0817   New Construction             7-004-001  01/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-05           5,520                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-06           3,500                  12/29/21   01/06/23    Cunningham Exavation                
                                                            SC-07          22,206                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-08          25,520                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-09           6,209                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-10          34,845                  12/29/21   01/06/23    Cunningham Excavation               
                                                            SC-11           1,407                  12/29/21   01/06/23    Cunningham Excavation               
 

          Concession Stand:
20-0658   New Construction             7-005-001  01/08/21  NO CHANGE ORDERS ON ELECTRONIC FILE

HARRISVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 23-03-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Elem. & High School K-12:
92-0104   Reconstruction               0-001-002  08/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1298   Reconstruction               0-001-005  04/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0017   Additions and Alterations    0-001-006  11/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5628/E-1        8,452                  12/20/02   01/02/03    Mr. Grant Const.                    
                                                            5628/G-1       15,142                  12/20/02   01/02/03    Mr. Grant Const.                    
                                                            E-8            23,633                  01/29/02   03/22/02    Collins-Hammond Elec.               
                                                            P-3            -4,370                  02/19/02   04/04/02    Lawman Heating                      
 
98-0966   Reconstruction               0-001-007  04/27/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-1              -908                  01/29/03   02/20/03    Norwood Plumbing                    
 
08-1236   Additions and Alterations    0-001-009  07/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01             -760                  04/12/10   05/28/10    CONTINENTAL CONSTRUCTION LLC        
                                                            1-02            4,706                  04/12/10   06/29/10    CONTINENTAL CONSTRUCTION            
                                                            1-05            7,975                  08/13/10   09/13/10    CONTINENTAL CONSTRUCTION            
                                                            1-06            3,701                  08/13/10   09/13/10    CONTINENTAL CONSTRUCTION            
                                                            1-07           -1,204                  10/08/10   10/29/10    CONTINENTAL CONSTRUCTION            
                                                            1-08           37,282                  10/19/10   11/01/10    CONTINENTAL CONSTRUCTION            
                                                            1-10           38,592                  04/21/11   05/13/11    CONTINENTAL CONSTRUCTION            
                                                            2-01           -2,769                  06/13/11   07/13/11    BURNS BROS CONTRACTORS              
                                                            2-03            1,661                  11/10/11   08/27/12    BURNS BROS CONTRACTORS              
                                                            3-01                0                  05/23/11   07/13/11    EMPIRE NORTHEAST INC                
                                                            4-01            1,762                  10/26/10   11/08/10    COLLINS-HAMMOND ELECTRICAL CONTRACT 
                                                            4-01                0                  11/10/10   11/16/10    COLLINS HAMMOND ELECTRICAL          
                                                            4-02            2,018                  10/26/10   11/08/10    COLLINS-HAMMOND ELECTRICAL CONTRACT 
                                                            4-03                0                  11/10/10   11/16/10    COLLINS HAMMOND ELECTRICAL          
                                                            4-03            2,460                  11/23/10   12/08/10    COLLINS-HAMMOND ELECTRICAL CONTRACTO
                                                            5-01           -2,000                  05/14/10   07/28/10    FACILITIES EQUIPMENT AND SERVICE    
                                                            6-01           -1,565                  03/15/10   04/30/10    PROFESSIONAL FURNISHINGS & EQUIPMENT
                                                            6-02           -2,000                  04/01/11   04/29/11    PROFESSIONAL FURNISHINGS & EQUIPMENT
                                                            7-01            1,869                  05/23/11   07/13/11    OP-TECH ENVIRONMENTAL SERVICES      
 
10-1417   Reconstruction               0-001-010  08/12/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           11,285                  04/13/12   08/31/12    CONTINENTAL CONSTRUCTION            
                                                            1-02            9,346                  04/13/12   08/31/12    CONTINENTAL CONSTRUCTION            
                                                            1-03            4,440                  04/13/12   08/31/12    CONTINENTAL CONSTRUCTION            
                                                            1-04           12,075                  08/07/12   11/28/12    Contential Construction             
                                                            1-05              426                  08/31/12   12/14/12    CONTINENTAL CONSTRUCTION            
                                                            1-06           14,108                  10/01/12   02/22/13    CONTINENTAL CONSTRUCTION            
                                                            1-07           15,052                  10/10/12   02/22/13    CONTINENTAL CONSTRUCTION            
 
15-0884   Reconstruction               0-001-011  01/04/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1             -2,983                  11/25/16   11/29/16    Northern Pioneer Contractors        
                                                            R1            -43,056                  11/25/16   11/29/16    RSI                                 
                                                            S1             -2,757                  01/03/17   01/05/17    T.J. Fiacco Construction, LLC       
 
16-0465   Reconstruction               0-001-012  06/06/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-2(B&C)       14,550                  08/27/18   09/06/18    BETTE & CRING                       
                                                            G-3            11,095                  06/25/19   07/01/19    BETTE & CRING                       
                                                            M1              2,484                  04/26/18   06/01/18    Lawman Heating & Cooling            
                                                            M2            -20,628                  06/25/19   06/27/19    LAWMAN HEATING & COOLING, INC.      
                                                            P-2             3,388                  01/03/19   02/12/19    HYDE-STONE MECHANICAL               
                                                            P1              9,255                  02/20/18   02/28/18    Hyde-Stone Mechanical               
                                                            S1            -20,000                  01/03/19   02/12/19    T.J. FIACCO CONSTRUCTION LLC        
 
18-0742   Reconstruction               0-001-013  05/07/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SSBA-1         13,800                  12/09/20   02/23/21    WATSON ELECTRIC, INC.               
                                                            SSBA-2         15,985                  12/09/20   02/23/21    WATSON ELECTRIC, INC.               
 
18-0506   Reconstruction               0-001-014  10/31/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0734   Reconstruction               0-001-015  01/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0910   Reconstruction               0-001-016  03/25/20  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1138   Reconstruction               0-001-017  03/25/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0282   Reconstruction               0-001-018  10/17/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             -3,589                  07/01/21   04/04/22    Continental Construction LLC        
 
22-0125   Reconstruction               0-001-019  11/14/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01            -896                  06/14/23   12/28/23    ENI MECHANICAL                      
 
23-0096   Reconstruction               0-001-020  09/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0607FP Reconstruction               0-001-FP1  12/04/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Storage Building:
00-0859   New Construction             2-004-001  05/31/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-1               -64                  07/17/02   08/28/02    Ritchie Bros.                       
 

          Bus Garage:
90-1106   Reconstruction               5-002-002  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0105   Reconstruction               5-002-003  08/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0018   Alterations                  5-002-005  11/24/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-10           45,981                  10/17/01   05/22/02    Murnane Bldg. Contractor            
 
08-1237   Reconstruction               5-002-006  07/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-03            1,922                  08/13/10   09/13/10    CONTINENTAL CONSTRUCTION            
                                                            1-04            4,752                  08/13/10   09/13/10    CONTINENTAL CONSTRUCTION            
                                                            1-09             -664                  10/19/10   11/01/10    CONTINENTAL CONSTRUCTION            
                                                            2-01                0                  05/23/11   07/13/11    BURNS BROS CONTRACTORS              
                                                            2-02                0                  05/23/11   07/13/11    BURNS BROS CONTRACTORS              
                                                            3-01           -4,755                  03/03/11   03/23/11    EMPIRE NORTHEAST INC                
                                                            4-02                0                  11/10/10   11/16/10    COLLINS HAMMOND ELECTRICAL          
                                                            7-01                0                  11/10/10   11/16/10    OP-TECH ENVIRONMENTAL SERVICES      
                                                            7-02             -176                  09/22/10   10/15/10    OP-TECH ENVIRONMENTAL SERVICES      
 
10-1410   Reconstruction               5-002-007  06/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01             -874                  11/16/11   01/30/12    EMPIRE NORTHEAST INC                
                                                            1-02            5,263                  03/02/12   09/07/12    EMPIRE NORTHEAST INC                
                                                            100-01         -1,559                  11/16/11   01/30/12    EMPIRE NORTHEAST INC                
                                                            100-02         -1,657                  11/16/11   01/30/12    EMPIRE NORTHEAST INC                
                                                            100-03           -908                  11/16/11   01/30/12    EMPIRE NORTHEAST INC                
 
16-0466   Additions and Alterations    5-002-008  06/06/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             19,692                  11/30/17   02/14/18    Bette & Cring                       
 
21-0232   Reconstruction               5-002-009  11/04/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            NTC-G1         -2,000                  06/27/22   04/10/23    Northern Tier Contr                 
 

LOWVILLE ACADEMY & CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 23-09-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Academy School:
90-1074   Reconstruction               0-001-002  03/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0780   Additions and Alterations    0-001-003  03/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1171   Reconstruction               0-001-005  05/09/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-01                0                  08/27/02   09/10/02    Avala Contracting                   
                                                            A-03           -4,402                  04/25/03   05/06/03    Avala Contracting                   
                                                            E-01                0                  08/27/02   10/28/02    New Century Elec.                   
                                                            GC-04           3,250                  04/24/02   05/02/02    DC Bldg. Systems                    
                                                            GC-3             -600                  11/26/01   01/08/02    DC Bldg. Systems                    
                                                            P-01             -979                  08/27/02   10/28/02    Hyde-Stone Mechanical               
                                                            P-02                0                  08/27/02   10/28/02    Hyde-Stone Mechanical               
                                                            P-03             -419                  08/27/02   10/28/02    Hyde-Stone Mechanical               
                                                            P-09              825                  05/06/03   05/08/03    Hyde-Stone Mechanical               
 
01-0053   Reconstruction               0-001-006  01/17/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-02                0                  04/25/03   05/05/03    Avala Contracting                   
                                                            E-02           10,425                  05/06/03   05/21/03    New Century Electric                
                                                            E-03                0                  05/06/03   08/05/03    New Century Electric                
                                                            E-04                0                  05/06/03   08/05/03    New Century Electric                
                                                            E-05                0                  05/06/03   08/05/03    New Century Electric                
                                                            E-06            4,378                  05/06/03   05/21/03    New Century Electric                
                                                            E-07            1,847                  05/06/03   05/21/03    New Century Electric                
                                                            E-08              516                  05/06/03   05/21/03    New Century Electric                
                                                            E-09            3,022                  05/06/03   05/21/03    New Century Electric                
                                                            E-10            2,525                  05/06/03   05/21/03    New Century Electric                
                                                            E-11            2,700                  05/06/03   05/21/03    New Century Electric                
                                                            E-12            3,393                  05/06/03   05/21/03    New Century Electric                
                                                            E-13            1,191                  05/06/03   05/21/03    New Century Electric                
                                                            GC-01         -18,000                  06/17/02   07/10/02    Ritchie Brothers                    
                                                            GC-02               0                  06/17/02   07/10/02    Ritchie Brothers                    
                                                            GC-03               0                  08/27/02   09/05/02    Ritchie Brothers                    
                                                            GC-04               0                  08/27/02   09/05/02    Ritchie Brothers                    
                                                            GC-05               0                  08/27/02   09/05/02    Ritchie Brothers                    
                                                            GC-06          -2,896                  08/27/02   09/05/02    Ritchie Brothers                    
                                                            GC-07            -724                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-08               0                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-09               0                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-10           6,986                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-11               0                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-12          26,232                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-13           4,818                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-14           5,291                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-15               0                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-16               0                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-17           1,107                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-18          15,140                  08/30/02   09/05/02    Ritchie Brothers                    
                                                            GC-19           6,291                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-20          13,249                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-21          20,083                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-22           5,216                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-23           3,456                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-24           1,804                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-25           1,066                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-26           8,938                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-27           1,150                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-28             944                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-29           1,150                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-30           8,476                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-31          -2,197                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-32          -7,215                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-33           4,917                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-34           4,940                  04/25/03   05/05/03    Ritchie Brothers                    
                                                            GC-35          -1,243                  05/06/03   05/08/03    Ritchie Brothers                    
                                                            GC-36           1,111                  05/06/03   05/08/03    Ritchie Brothers                    
                                                            H-01                0                  05/06/03   08/05/03    Agway Energy Products               
                                                            H-02                0                  05/06/03   05/23/03    Agway Energy Products               
                                                            H-03                0                  05/06/03   05/23/03    Agway Energy Products               
                                                            H-04                0                  05/06/03   08/05/03    Agway Energy Products               
                                                            H-05           -3,053                  05/06/03   05/23/03    Agway Energy Products               
                                                            H-06            7,650                  05/06/03   05/23/03    Agway Energy Electric               
                                                            H-07            5,093                  05/06/03   05/23/03    Agway Energy Products               
                                                            H-08            8,212                  05/06/03   08/05/03    Agway Energy Products               
                                                            H-09            7,876                  05/06/03   05/23/03    Agway Energy Products               
                                                            H-10            4,915                  05/06/03   05/23/03    Agway Energy Products               
                                                            H-11            6,220                  05/06/03   05/23/03    Agway Energy Products               
                                                            H-12            8,227                  05/06/03   08/05/03    Agway Energy Products               
                                                            H-13            1,556                  07/08/04   07/15/04    Agway Energy Products               
                                                            P-04                0                  05/06/03   05/08/03    Hyde-Stone Mechanical               
                                                            P-05            4,723                  05/06/03   05/08/03    Hyde-Stone Mechanical               
                                                            P-06                0                  05/06/03   05/08/03    Hyde-Stone Mechanical               
                                                            P-07            2,186                  05/06/03   05/08/03    Hyde-Stone Mechanical               
                                                            P-08            1,853                  05/06/03   05/08/03    Hyde-Stone Mechanical               
 
08-0568   Additions and Alterations    0-001-007  03/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            38,799                  09/22/09   10/21/09    RIDLEY ELECTRIC CO INC              
                                                            001            52,008                  10/19/09   11/12/09    BETTE & CRING LLC                   
                                                            001                 0                  10/19/09   12/15/09    BELLUCCI ENTERPRISES INC            
                                                            001              -539                  03/01/10   04/30/10    J&A MECHANICAL CONTRACTORS INC      
                                                            001                 0                  11/18/10   11/29/10    ADHAN PIPING COMPANY INC            
                                                            001                 0                  12/08/10   01/13/11    NORTHEAST INTERIOR SYSTEMS INC      
                                                            001            -5,000                  09/16/11   12/22/11    SYRACUSE SCENERY & STAGE LIGHTING CO
                                                            001            13,890                  10/21/11   12/12/11    CHARLES T DRISCOLL MASONRY REST CO  
                                                            001                 0                  10/25/11   12/22/11    SYRACUSE MERIT ELECTRIC INC         
                                                            002                 0                  10/19/09   11/12/09    BELLUCCI ENTERPRISES INC            
                                                            002            64,927                  10/19/09   11/12/09    BETTE & CRING LLC                   
                                                            002            45,222                  10/13/09   12/15/09    RIDLEY ELECTRIC CO INC              
                                                            002            -8,028                  03/01/10   04/30/10    J&A MECHANICAL CONTRACTORS INC      
                                                            002                 0                  12/03/10     /  /      SYRACUSE MERIT ELECTRIC INC         
                                                            002                 0                  12/03/10   01/06/11    SYRACUSE MERIT ELECTRIC INC         
                                                            002                 0                  12/31/10   01/28/11    ADHAN PIPING COMPANY INC            
                                                            002                 0                  03/04/11   05/20/11    NORTHEAST INTERIOR SYSTEMS INC      
                                                            003                 0                  10/19/09   11/12/09    BELLUCCI ENTERPRISES INC            
                                                            003                 0                  10/19/09   11/12/09    RIDLEY ELECTRIC CO INC              
                                                            003           -11,369                  02/12/10   04/22/10    BETTE & CRING LLC                   
                                                            003            -3,383                  03/01/10   04/30/10    J&A MECHANICAL CONTRACTORS INC      
                                                            003                 0                  12/31/10   01/28/11    ADHAN PIPING COMPANY INC            
                                                            003                 0                  12/31/10   01/28/11    SYRACUSE MERIT ELECTRIC INC         
                                                            003                 0                  06/01/11   06/17/11    NORTHEAST INTERIOR SYSTEMS INC      
                                                            004                 0                  11/23/09   12/16/09    BELLUCCI ENTERPRISES INC            
                                                            004               531                  01/13/10   02/26/10    RIDLEY ELECTRIC CO INC              
                                                            004           -15,166                  03/01/10   04/30/10    J&A MECHANICAL CONTRACTORS INC      
                                                            004            -1,213                  12/31/10   01/28/11    ADHAN PIPING COMPANY INC            
                                                            004                 0                  07/08/11   07/27/11    NORTHEAST INTERIOR SYSTEMS INC      
                                                            004           -38,226                  10/25/11   12/22/11    SYRACUSE MERIT ELECTRIC INC         
                                                            005             9,835                  11/23/09   12/16/09    BELLUCCI ENTERPRISES INC            
                                                            005           274,319                  12/29/09   02/04/10    BETTE & CRING LLC                   
                                                            005             2,946                  01/13/10   03/03/10    RIDLEY ELECTRIC CO INC              
                                                            005            -3,212                  07/08/11   07/27/11    NORTHEAST INTERIOR SYSTEMS INC      
                                                            005                 0                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            006           -32,080                  12/29/09   02/02/10    BETTE & CRING LLC                   
                                                            006             3,896                  12/29/09   02/09/10    BELLUCCI ENTERPRISES INC            
                                                            006             5,967                  01/13/10   02/26/10    RIDLEY ELECTRIC CO INC              
                                                            006                 0                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            007                 0                  12/29/09   02/02/10    BELLUCCI ENTERPRISES,INC            
                                                            007             4,195                  01/13/10   02/26/10    RIDLEY ELECTRIC CO INC              
                                                            007             4,320                  01/25/10   03/09/10    BETTE & CRING LLC                   
                                                            007                 0                  04/05/11   05/13/11    J&A MECHANICAL                      
                                                            008            72,415                  12/29/09   02/05/10    BETTE & CRING LLC                   
                                                            008             3,302                  01/13/10   03/30/10    RIDLEY ELECTRIC CO INC              
                                                            008            -2,920                  01/28/10   03/01/10    BELLUCCI ENTERPRISES INC            
                                                            008             3,675                  01/25/10   03/09/10    BETTE & CRING LLC                   
                                                            008                 0                  04/05/11   05/13/11    J&A MECHANICAL CONTRACTORS INC      
                                                            009               260                  01/13/10   02/26/10    RIDLEY ELECTRIC CO INC              
                                                            009            -9,031                  01/28/10   02/26/10    BELLUCCI ENTERPRISES INC            
                                                            009             1,118                  01/25/10   03/09/10    BETTE & CRING LLC                   
                                                            009                 0                  04/05/11   05/13/11    J&A MECHANICAL CONTRACTORS INC      
                                                            010            -3,078                  01/18/10   02/26/10    BELLUCCI ENTERPRISES INC            
                                                            010             8,463                  02/12/10   04/22/10    BETTE & CRING LLC                   
                                                            010            11,859                  05/27/10   08/05/10    RIDLEY ELECTRIC CO INC              
                                                            010                 0                  04/05/11   05/13/11    J&A MECHANICAL CONTRACTORS INC      
                                                            011                 0                  03/23/10   05/20/10    BELLUCCI ENTERPRISES INC            
                                                            011                 0                  05/27/10   08/04/10    RIDLEY ELECTRIC CO INC              
                                                            011                 0                  03/16/11   05/20/11    J&A MECHANICAL CONTRACTORS INC      
                                                            012                 0                  03/23/10   05/20/10    BELLUCCI ENTERPRISES INC            
                                                            012             3,136                  04/29/10   07/19/10    BETTE & CRING LLC                   
                                                            012             3,900                  05/27/10   08/04/10    RIDLEY ELECTRIC CO INC              
                                                            012                 0                  04/05/11   05/13/11    J&A MECHANICAL CONTRACTORS INC      
                                                            013                 0                  03/23/10   05/20/10    BELLUCCI ENTERPRISES INC            
                                                            013             5,992                  04/29/10   07/19/10    BETTE & CRING LLC                   
                                                            013             7,175                  05/27/10   08/04/10    RIDLEY ELECTRIC CO INC              
                                                            013                 0                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            014            10,236                  04/30/10   08/04/10    BETTE & CRING LLC                   
                                                            014             3,630                  06/02/10   08/06/10    RIDLEY ELECTRIC CO INC              
                                                            014             6,179                  07/19/10   09/03/10    BELLUCCI ENTERPRISES INC            
                                                            014                 0                  08/25/10   09/13/10    ADHAN PIPING COMPANY INC            
                                                            014                 0                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            015            17,565                  04/30/10   08/04/10    BETTE & CRING LLC                   
                                                            015               655                  07/19/10   09/03/10    RIDLEY ELECTRIC CO INC              
                                                            015             1,447                  07/19/10   09/03/10    BELLUCCI ENTERPRISES INC            
                                                            015                 0                  08/25/10   09/13/10    ADHAN PIPING COMPANY INC            
                                                            015                 0                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            016             4,445                  05/27/10   08/04/10    BETTE & CRING LLC                   
                                                            016             1,778                  08/06/10   09/10/10    BELLUCCI ENTERPRISES INC            
                                                            016                 0                  08/25/10   09/13/10    ADHAN PIPING COMPANY INC            
                                                            016             3,898                  11/18/10   11/30/10    RIDLEY ELECTRIC CO INC              
                                                            016                 0                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            017             4,905                  05/27/10   08/04/10    BETTE & CRING LLC                   
                                                            017             2,106                  08/06/10   09/10/10    BELLUCCI ENTERPRISES INC            
                                                            017                 0                  08/25/10   09/13/10    ADHAN PIPING COMPANY INC            
                                                            017            20,000                  11/18/10   11/30/10    RIDLEY ELECTRIC CO INC              
                                                            017            -4,738                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            018             2,785                  05/27/10   08/04/10    BETTE & CRING LLC                   
                                                            018                 0                  09/28/10   11/05/10    BELLUCCI ENTERPRISES INC            
                                                            018             7,083                  11/18/10   11/29/10    RIDLEY ELECTRIC CO INC              
                                                            018             6,264                  11/17/11   07/17/12    J&A MECHANICAL CONTRACTORS INC      
                                                            019             3,005                  05/27/10   08/04/10    BETTE & CRING LLC                   
                                                            019             4,940                  09/28/10   11/05/10    BELLUCCI ENTERPRISES INC            
                                                            019             9,046                  11/18/10   11/30/10    RIDLEY ELECTRIC CO INC              
                                                            019             6,637                  11/17/11   07/17/12    J&A MECHANICAL CONTRACTORS INC      
                                                            020             1,913                  05/27/10   08/04/10    BETTE & CRING LLC                   
                                                            020             8,754                  11/18/10   11/30/10    RIDLEY ELECTRIC CO INC              
                                                            020            11,121                  12/31/10   01/28/11    BELLUCCI ENTERPRISES INC            
                                                            021             9,232                  07/19/10   09/03/10    BETTE & CRING LLC                   
                                                            021            11,723                  11/18/10   11/30/10    RIDLEY ELECTRIC CO INC              
                                                            021                 0                  01/28/11   03/10/11    BELLUCCI ENTERPRISES INC            
                                                            022             3,496                  07/19/10   09/03/10    BETTE & CRING LLC                   
                                                            022             6,742                  10/28/10     /  /      ADHAN PIPING COMPANY INC            
                                                            022             9,220                  11/18/10   11/29/10    RIDLEY ELECTRIC CO INC              
                                                            022            13,638                  03/04/11   05/20/11    BELLUCCI ENTERPRISES INC            
                                                            023             5,308                  07/19/10   09/03/10    BETTE & CRING LLC                   
                                                            023             6,380                  11/18/10   11/29/10    RIDLEY ELECTRIC CO INC              
                                                            023             6,514                  04/05/11   05/13/11    BELLUCCI ENTERPRISES INC            
                                                            024             3,476                  07/19/10   09/10/10    BETTE & CRING LLC                   
                                                            024            16,570                  11/18/10   11/29/10    RIDLEY ELECTRIC CO INC              
                                                            025             6,479                  07/19/10   09/03/10    BETTE & CRING LLC                   
                                                            025            -2,776                  12/31/10   01/28/11    RIDLEY ELECTRIC CO INC              
                                                            026             5,130                  07/19/10   09/03/10    BETTE & CRING LLC                   
                                                            026                 0                  12/31/10   01/28/11    RIDLEY ELECTRIC CO INC              
                                                            027             5,870                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            027                 0                  12/31/10   01/28/11    RIDLEY ELECTRIC CO INC              
                                                            028               437                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            028                 0                  01/28/11   03/10/11    RIDLEY ELECTRIC CO INC              
                                                            029             2,236                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            029             3,515                  01/28/11   03/10/11    RIDLEY ELECTRIC CO INC              
                                                            030             3,552                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            030             8,658                  05/24/11   06/08/11    RIDLEY ELECTRIC CO INC              
                                                            031             5,210                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            031             6,633                  05/24/11   06/08/11    RIDLEY ELECTRIC CO INC              
                                                            032             8,826                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            032               968                  05/24/11   06/08/11    RIDLEY ELECTRIC CO INC              
                                                            033             1,558                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            034               875                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            035             1,612                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            036             6,062                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            037             8,483                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            038             4,990                  07/19/10   09/03/10    BETTE & CRING LLC                   
                                                            039             4,909                  07/19/10   09/01/10    BETTE & CRING LLC                   
                                                            040             4,107                  08/16/10   09/15/10    BETTE & CRING LLC                   
                                                            041             4,804                  08/16/10   09/15/10    BETTE & CRING LLC                   
                                                            042             1,981                  08/16/10   09/15/10    BETTE & CRING LLC                   
                                                            043                 0                  08/16/10   09/15/10    BETTE & CRING LLC                   
                                                            044            12,490                  08/16/10   09/15/10    BETTE & CRING LLC                   
                                                            045             1,446                  08/16/10   09/15/10    BETTE & CRING                       
                                                            046             5,400                  08/16/10   09/15/10    BETTE & CRING LLC                   
                                                            047                 0                  08/25/10   09/13/10    BETTE & CRING LLC                   
                                                            048             6,075                  08/16/10   09/15/10    BETTE & CRING LLC                   
                                                            049                 0                  08/25/10   09/13/10    BETTE & CRING LLC                   
                                                            050                 0                  08/25/10   09/13/10    BETTE & CRING LLC                   
                                                            051           -23,431                  08/31/10   09/28/10    BETTE & CRING LLC                   
                                                            052                 0                  09/28/10   11/05/10    BETTE & CRING LLC                   
                                                            053                 0                  09/28/10   11/05/10    BETTE & CRING LLC                   
                                                            054            15,842                  09/28/10   11/05/10    BETTE & CRING LLC                   
                                                            055             8,185                  09/28/10   11/05/10    BETTE & CRING LLC                   
                                                            056            33,324                  11/18/10   11/29/10    BETTE & CRING LLC                   
                                                            057            12,894                  11/18/10   11/29/10    BETTE & CRING LLC                   
                                                            058             6,631                  11/18/10   11/29/10    BETTE & CRING LLC                   
                                                            059             3,071                  11/18/10   11/29/10    BETTE & CRING LLC                   
                                                            060             9,345                  11/18/10   11/29/10    BETTE & CRING LLC                   
                                                            061            12,971                  11/18/10   11/29/10    BETTE & CRING LLC                   
                                                            062                 0                  12/03/10   01/06/11    BETTE & CRING LLC                   
                                                            063            23,553                  12/08/10   01/13/11    BETTE & CRING LLC                   
                                                            064            16,358                  12/08/10   01/13/11    BETTE & CRING LLC                   
                                                            065                 0                  01/28/11   03/10/11    BETTE & CRING LLC                   
                                                            066            12,593                  01/28/11   03/10/11    BETTE & CRING LLC                   
                                                            067            12,018                  03/04/11   05/20/11    BETTE & CRING LLC                   
                                                            068            11,691                  05/24/11   06/08/11    BETTE & CRING LLC                   
                                                            069             7,180                  05/24/11   11/23/11    BETTE & CRING LLC                   
                                                            070            11,118                  05/24/11   06/08/11    BETTE & CRING LLC                   
                                                            071            13,446                  07/20/11   08/12/11    BETTE & CRING LLC                   
                                                            072            27,816                  07/20/11   08/09/11    BETTE & CRING LLC                   
                                                            073            15,735                  07/20/11   08/09/11    Bette & Cring                       
                                                            074            16,357                  09/30/11   11/21/11    BETTE & CRING LLC                   
                                                            GC-11               0                  04/29/10   07/19/10    Bette & Cring LLC                   
                                                            PC-11               0                  03/23/10     /  /      BELLUCCI ENTERPRISES, INC.          
                                                            PC-12               0                  03/23/10     /  /      BELLUCCI ENTERPRISES, INC.          
                                                            PC-13               0                  03/23/10     /  /      BELLUCCI ENTERPRISES,. INC.         
 
07-1619   Reconstruction               0-001-008  03/17/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,758                  11/03/10   11/04/10    LUPINI CONSTRUCTION, INC.           
                                                            001            -5,755                  04/06/09   07/24/09    JAMES A. EDGAR ROOFING & SHEETMETAL 
                                                            001           -13,089                  04/30/09   08/18/09    JWJ INDUSTRIES INC                  
                                                            002           -60,000                  07/19/10   09/01/10    BR JOHNSON INC                      
                                                            GC-01          19,620                  04/02/09   08/14/09    BR JOHNSON INC                      
                                                            HVAC-01        -5,000                  11/03/10   11/04/10    M&N PLUMBING & HEATING INC          
 
07-1901   Reconstruction               0-001-009  09/25/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,691                  03/09/09   06/02/09    SUNSHINE ENVIRONMENTAL SERVICES     
                                                            001            79,330                  10/13/09   11/18/09    ADHAN PIPING COMPANY INC            
                                                            002            93,720                  10/13/09   11/18/09    ADHAN PIPING COMPANY INC            
                                                            003            27,645                  10/13/09   11/18/09    ADHAN PIPING COMPANY INC            
                                                            004                 0                  10/13/09   11/18/09    ADHAN PIPING COMPANY INC            
                                                            005                 0                  10/13/09   11/18/09    ADHAN PIPING COMPANY INC            
                                                            006                 0                  10/13/09   11/18/09    ADHAN PIPING COMPANY INC            
                                                            007                 0                  10/13/09   11/18/09    ADHAN PIPING COMPANY INC            
                                                            008                 0                  03/01/10   04/30/10    ADHAN PIPING COMPANY INC            
                                                            009                 0                  03/01/10   04/30/10    ADHAN PIPING COMPANY INC            
                                                            010                 0                  03/01/10   04/30/10    ADHAN PIPING COMPANY INC            
                                                            011                 0                  03/01/10   04/30/10    ADHAN PIPING COMPANY INC            
                                                            012            18,199                  05/27/10   08/05/10    ADHAN PIPING COMPANY INC            
                                                            013             2,227                  05/27/10   08/05/10    ADHAN PIPING COMPANY INC            
                                                            018                 0                  09/28/10   10/28/10    ADHAN PIPING COMPANY INC            
                                                            019            26,282                  09/28/10   10/28/10    ADHAN PIPING COMPANY INC            
                                                            020            24,468                  09/28/10   10/28/10    ADHAN PIPING COMPANY INC            
                                                            021            15,285                  09/28/10   10/28/10    ADHAN PIPING COMPANY INC            
                                                            022             6,742                  10/28/10   11/12/10    ADHAN PIPING COMPANY INC            
                                                            023                 0                  03/04/11   03/28/11    ADHAN PIPING COMPANY INC            
                                                            024           -10,432                  03/04/11   03/28/11    ADHAN PIPING COMPANY INC            
 
10-0921   Reconstruction               0-001-010  03/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            13,890                  01/10/12   05/03/12    CHARLES T DRISCOLL MASONRY REST CO  
                                                            002            15,243                  04/06/12   09/28/12    CHARLES T DRISCOLL MASONRY REST CO  
                                                            003                 0                  04/06/12   09/28/12    CHARLES T DRISCOLL MASONRY REST CO  
 
15-0069   Reconstruction               0-001-011  04/07/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           8,213                  07/27/16   09/30/16    S&L Electric, Inc.                  
                                                            EC-02         147,900                  06/16/17   10/30/17    S&L Electric, Inc.                  
                                                            EC-03          19,736                  01/08/18   02/28/18    S&L Electric, Inc.                  
                                                            EC-04         -38,282                  01/08/18   02/28/18    S&L Electric, Inc.                  
                                                            GC-01          45,000                  03/29/17   01/22/18    Putrelo Building Enterprises, Inc.  
                                                            GC-01           5,764                  09/18/17   10/13/17    Putrelo Building Enterprises Inc.   
                                                            GC-01          -1,217                  01/08/18   01/26/18    Continental Construction LLC        
                                                            GC-02           5,830                  04/10/17   05/15/17    Putrelo Building Enterprises, Inc.  
                                                            GC-02           1,740                  09/18/17   10/13/17    Putrelo Building Enterprises Inc.   
                                                            GC-03          12,378                  04/10/17   05/15/17    Putrelo Building Enterprises, Inc.  
                                                            GC-04          24,132                  04/10/17   05/15/17    Putrelo Building Enterprises, Inc.  
                                                            GC-05          33,750                  06/16/17   07/14/17    Putrelo Building Enterprises Inc.   
                                                            GC-06          11,520                  06/16/17   07/14/17    Putrelo Building Enterprises Inc.   
                                                            GC-07          18,563                  06/16/17   07/14/17    Putrelo Building Enterprises Inc.   
                                                            GC-08           4,165                  06/16/17   07/14/17    Putrelo Building Enterprises Inc.   
                                                            GC-09          10,484                  06/16/17   07/14/17    Putrelo Building Enterprises Inc.   
                                                            GC-10          18,519                  06/16/17   07/14/17    Putrelo Building Enterprises Inc.   
                                                            GC-11           5,551                  06/16/17   07/14/17    Putrelo Building Enterprises Inc.   
                                                            GC-12           8,154                  07/24/17   08/10/17    Putrelo Building Enterprises Inc.   
                                                            GC-13           5,388                  12/21/17   01/29/18    Putrelo Building Enterprises Inc.   
                                                            GC-14          -4,141                  12/21/17   01/29/18    Putrelo Building Enterprises Inc.   
                                                            GC-15             -20                  12/21/17   01/29/18    Putrelo Building Enterprises Inc.   
                                                            MC-01          72,500                  06/16/17   10/30/17    J.E. Sheehan Contracting Corporation
                                                            MC-02         -47,620                  01/08/18   02/28/18    J.E. Sheehan Contracting Corporation
                                                            PC-01         -52,000                  07/24/17   10/25/17    J.E. Sheehan Contracting Corporation
                                                            PC-02         -18,638                  07/24/17   10/25/17    J.E. Sheehan Contracting Corporation
 
14-1096   Reconstruction               0-001-012  02/18/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01         -14,582                  01/08/18   02/05/18    Elmer W. Davis, Inc.                
                                                            RC-02         -21,500                  01/08/18   02/05/18    Elmer W. Davis, Inc.                
                                                            RC-03          -1,859                  01/08/18   02/05/18    Elmer W. Davis, Inc.                
                                                            RC-04         -16,474                  01/26/18   02/13/18    Elmer W. Davis, Inc.                
 
16-1888   Reconstruction               0-001-013  09/12/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC01           -2,052                  06/11/18   06/29/18    NEW CENTURY ELECTRIC INC            
 
18-0763   Reconstruction               0-001-014  01/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0422   Reconstruction               0-001-015  11/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          41,282                  02/13/20   03/20/20    NEW ENGLAND SECURITY FILM, LLC      
                                                            GC-02          19,195                  06/26/20   08/05/20    NEW ENGLAND SECURITY FILM, LLC      
                                                            GC-03           2,908                  06/25/20   08/05/20    NEW ENGLAND SECURITY FILM, LLC      
 
20-0556   Reconstruction               0-001-017  12/11/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0558   Reconstruction               0-001-018  12/24/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1387   Reconstruction               0-001-019  05/26/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MR-01          12,075                  08/19/21   11/25/22    CHARLES DRISCOLL MASONRY RESTORATION
                                                            MR-02          -4,000                  11/12/21   09/06/22    Charles Driscoll Mason Restoration  
 
22-0192   Reconstruction               0-001-020  11/06/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G1             -4,000                  06/29/23     /  /      POWIA CONTRACTING                   
 
22-0411FA Reconstruction               0-001-021  11/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2285   Alterations                  0-001-022  10/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0591   Reconstruction               0-001-023  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0806FP Reconstruction               0-001-FP1  01/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXAdmin/Maint.Bldg(now 1-004):
00-1170   Reconstruction               0-004-002  05/09/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Admin/Maint Building (Old Bus Gar):
00-0208   Reconstruction               1-004-003  09/11/00  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0109   Reconstruction               1-004-004  07/29/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-001         -8,500                  02/17/17   02/24/17    PTL Contracting Corp.               
 

          Bus Garage:
97-0781   Reconstruction               5-005-003  03/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0054   Reconstruction               5-005-004  01/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0302   Additions and Alterations    5-005-005  01/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            21,400                  04/30/10   08/04/10    CHARLES A GAETANO CONSTRUCTION CORP 
                                                            001             7,200                  06/30/10   08/16/10    EMPIRE NORTHEAST                    
                                                            001               500                  08/06/10   09/10/10    SC SPENCER ELECTRIC INC             
                                                            001                 0                  04/05/11   05/13/11    J&A MECHANICAL CONTRACTORS INC      
                                                            002            18,000                  04/30/10   08/04/10    Charles A. Gaetano Const. Corp.     
                                                            002             3,850                  08/06/10   09/10/10    SC SPENCER ELECTRIC INC             
                                                            002                 0                  12/31/10   01/28/11    EMPIRE NORTHEAST                    
                                                            002           -19,330                  10/13/11   12/22/11    J&A MECHANICAL CONTRACTORS INC      
                                                            003             2,173                  07/19/10   09/01/10    CHARLES A GAETANO CONSTRUCTION CORP 
                                                            003               675                  08/06/10   09/10/10    SC SPENCER ELECTRIC INC             
                                                            003           -15,999                  12/31/10   01/28/11    EMPIRE NORTHEAST                    
                                                            004                 0                  08/25/10   09/13/10    CHARLES A GAETANO CONSTRUCTION CORP 
                                                            004             6,348                  08/16/10   09/15/10    SC SPENCER ELECTRIC INC             
                                                            005                 0                  11/18/10   11/29/10    CHARLES A GAETANO CONSTRUCTION CORP 
                                                            005                 0                  11/18/10   11/29/10    SC SPENCER ELECTRIC INC             
                                                            006                 0                  12/08/10   01/13/11    SC SPENCER ELECTRIC INC             
                                                            006                 0                  12/31/10   01/28/11    CHARLES A GAETANO CONSTRUCTION CORP 
                                                            007                 0                  12/31/10   01/28/11    SC SPENCER ELECTRIC INC             
                                                            007            -2,067                  12/31/10   01/28/11    CHARLES A GAETANO CONSTRUCTION CORP 
                                                            008           -10,572                  12/31/10   01/28/11    SC SPENCER ELECTRIC INC             
                                                            008             4,487                  03/04/11   05/20/11    CHARLES A GAETANO CONST             
 
16-0108   Reconstruction               5-005-006  07/29/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01         -15,295                  06/16/17   06/23/17    RSI Roofing, Inc.                   
 
22-2286   Reconstruction               5-005-008  10/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box:
22-2287   New Construction             7-018-001  10/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

SOUTH LEWIS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 23-11-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          xxGlenfield El- sold 1/18/2022:
91-0595   Reconstruction               0-004-004  01/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1491   Additions and Alterations    0-004-005  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1492   Reconstruction               0-004-006  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0141   Reconstruction               0-004-007  08/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0865   Reconstruction               0-004-008  08/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             3,666                  08/02/02   08/16/02    Huen New York                       
                                                            003           -18,800                  10/09/02   12/02/02    Safe Environment of America         
                                                            006             7,200                  09/04/02   09/05/02    Acts II Const.                      
                                                            008            -2,200                  11/22/02   12/02/02    Acts II Const.                      
                                                            009            -3,250                  01/28/03   02/11/03    Acts II Const.                      
                                                            009             1,533                  02/18/03   02/24/03    Huen New York                       
                                                            010           -22,394                  08/02/02   08/16/02    Bette & Cring                       
                                                            015              -732                  11/22/02   12/10/02    Bette & Cring                       
                                                            015             1,127                  02/19/03   03/11/03    Huen New York                       
                                                            020             1,006                  02/19/03   03/11/03    Bette & Cring                       
                                                            025               486                  04/01/03   04/08/03    Bette & Cring                       
 
09-0088   Reconstruction               0-004-009  12/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-016           3,082                  12/07/11   05/15/12    PATRICIA ELECTRIC INC               
                                                            G-024          12,784                  08/29/11   09/20/11    BETTE AND CRING LLC                 
                                                            G-025          28,695                  11/09/11   02/03/12    BETTE AND CRING LLC                 
                                                            G-034           2,489                  01/11/12   05/01/12    BETTE AND CRING LLC                 
                                                            G-040           9,821                  04/13/12   08/30/12    BETTE AND CRING LLC                 
                                                            G-044           8,030                  09/05/12   12/20/12    BETTE AND CRING LLC                 
                                                            H-008             582                  07/05/11   11/08/11    LAWMAN HEATING AND COOLING INC      
                                                            P-011          16,619                  07/05/11   11/08/11    BELLUCCI ENTERPRISES INC            
                                                            P-015          10,712                  10/05/11   05/15/12    BELLUCCI ENTERPRISES INC            
                                                            P-017           8,952                  12/13/11   05/15/12    BELLUCCI ENTERPRISES INC            
 
94-0232EP Energy Project               0-004-E01  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Constableville Elem.:
93-1493   Reconstruction               0-007-004  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1494   Reconstruction               0-007-005  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0142   Reconstruction               0-007-007  08/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0866   Reconstruction               0-007-008  08/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,649                  08/02/02   08/16/02    Huen New York                       
                                                            003             2,736                  07/16/02   07/24/02    Acts II Const.                      
                                                            004             2,139                  04/29/02   05/09/02    Bette & Cring                       
                                                            005            18,462                  06/04/02   06/05/02    Bette & Cring                       
                                                            005             6,600                  09/04/02   09/05/02    Safe Environment of America         
                                                            006             5,097                  08/20/04   09/17/04    S&D Enterprises                     
                                                            007             1,760                  10/22/02   12/10/02    Safe Environment of America         
                                                            008             5,025                  06/19/02   07/12/02    Bette & Cring                       
                                                            008             4,094                  02/19/03   11/29/04    HJ Brandeles                        
                                                            009            15,134                  08/02/02   08/16/02    Bette & Cring                       
                                                            009               650                  01/28/03   11/29/04    HJ Brandeles                        
                                                            010            -3,250                  01/28/03   02/11/03    Acts II Const.                      
                                                            010             2,312                  08/20/04   09/17/04    Huen New York                       
                                                            012             3,174                  08/20/04   12/21/04    Huen New York                       
                                                            016             8,997                  11/22/02   12/10/02    Bette & Cring                       
                                                            016             2,886                  02/19/03   03/11/03    Huen New York                       
                                                            018               822                  02/19/03   03/11/03    Huen New York                       
                                                            019            13,139                  08/04/03   04/30/04    Huen New York                       
 
09-0089   Reconstruction               0-007-010  12/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-005             470                  02/03/11   03/03/11    PATRICIA ELECTRIC INC               
                                                            E-011           3,447                  07/19/11   08/05/11    PATRICIA ELECTRIC INC               
                                                            E-020           2,479                  07/09/12   07/03/13    PATRICIA ELECTRIC INC               
                                                            G-004          26,250                  09/16/10   09/28/10    BETTE AND CRING LLC                 
                                                            G-017           5,880                  08/05/11   09/07/11    BETTE AND CRING LLC                 
                                                            G-042           2,196                  09/05/12   12/20/12    BETTE AND CRING LLC                 
                                                            H-005           1,375                  04/18/11   05/13/11    LAWMAN HEATING AND COOLING INC      
 
94-0233EP Energy Project               0-007-E01  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPort Leyden- sold 12/2021:
93-1495   Reconstruction               0-008-004  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1496   Reconstruction               0-008-005  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0143   Reconstruction               0-008-006  08/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0099   Reconstruction               0-008-007  10/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0864   Reconstruction               0-008-008  08/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002            -4,700                  06/19/02   07/12/02    Safe Environment of America         
                                                            003            -1,716                  07/16/02   07/24/02    Delaney Const.                      
                                                            004               794                  08/02/02   08/16/02    Huen New York                       
                                                            006             9,910                  10/22/02   12/10/02    Safe Environment of America         
                                                            007             3,223                  02/19/03   02/26/03    Huen New York                       
                                                            007            10,747                  02/19/03   11/29/04    HJ Brandeles                        
                                                            010             1,986                  01/28/03   11/29/04    HJ Brandeles                        
                                                            012            -1,026                  08/02/02   08/16/02    Bette & Cring                       
                                                            013               243                  02/19/03   02/26/03    Huen New York                       
                                                            014             5,932                  02/19/03   03/11/03    Huen New York                       
                                                            017             7,537                  11/22/02   12/10/02    Bette & Cring                       
                                                            022               553                  02/19/03   02/26/03    Bette & Cring                       
 
09-0090   Reconstruction               0-008-010  12/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-006             240                  02/03/11   03/03/11    PATRICIA ELECTRIC INC               
                                                            E-010           1,190                  07/19/11   08/05/11    PATRICIA ELECTRIC                   
                                                            G-003          -4,850                  09/16/10   09/28/10    BETTE AND CRING LLC                 
                                                            G-007          14,739                  11/26/10   12/31/10    BETTE AND CRING LLC                 
                                                            G-023           8,055                  08/29/11   09/20/11    BETTE AND CRING LLC                 
                                                            G-028           7,435                  11/09/11   02/03/12    BETTE AND CRING LLC                 
                                                            G-039           4,802                  04/13/12   08/30/12    BETTE AND CRING LLC                 
                                                            G-046           5,790                  09/05/12   12/20/12    BETTE AND CRING LLC                 
                                                            G-049          -1,300                  12/06/12   11/22/13    BETTE AND CRING LLC                 
                                                            H-004          10,218                  04/18/11   05/13/11    LAWMAN HEATING AND COOLING INC      
                                                            H-007           5,340                  07/05/11   11/08/11    LAWMAN HEATING AND COOLING INC      
                                                            P-008             514                  04/06/11   04/29/11    BELLUCCI ENTERPRISES INC            
                                                            P-021           4,221                  03/23/12   01/25/13    BELLUCCI ENTERPRISES INC            
 
94-0234EP Energy Project               0-008-E01  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          South Lewis ES-MS-HS (formerly HS):
93-1299   Additions and Alterations    0-013-005  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0144   Reconstruction               0-013-007  08/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0456   Reconstruction               0-013-008  12/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0868   Additions and Alterations    0-013-010  08/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -1,989                  06/06/02   07/10/02    Acts II Const.                      
                                                            001            16,302                  06/19/02   07/12/02    Delaney Const.                      
                                                            001             7,648                  07/10/03   12/13/04    HJ Brandeles                        
                                                            001             2,188                  07/10/03   11/29/04    Bette & Cring                       
                                                            002            16,704                  07/16/02   07/24/02    Delaney Const.                      
                                                            002           -66,636                  08/02/02   08/16/02    Huen New York                       
                                                            002            13,857                  09/04/02   09/05/02    S&D Enterprises                     
                                                            003               841                  04/29/02   05/09/02    Bette & Cring                       
                                                            003             1,729                  06/04/02   06/05/02    HJ Brandeles                        
                                                            003            15,007                  09/04/02   09/05/02    S&D Enterprises                     
                                                            004            -2,000                  08/02/02   08/16/02    Delaney Const.                      
                                                            004            12,950                  09/04/02   09/05/02    S&D Enterprises                     
                                                            004            10,434                  09/04/02   09/05/02    HJ Brandeles                        
                                                            004            16,064                  09/04/02   09/05/02    Acts II Const.                      
                                                            004           -16,845                  10/09/02   12/02/02    Safe Environment of America         
                                                            005           -71,490                  11/22/02   12/02/02    Huen New York                       
                                                            005             2,945                  08/20/04   09/17/04    S&D Enterprises                     
                                                            006             9,488                  06/04/02   06/05/02    Bette & Cring                       
                                                            006            -5,549                  02/18/03   09/17/04    Huen New York                       
                                                            006             6,998                  08/20/04   11/03/04    HJ Brandeles                        
                                                            007               365                  11/22/02   12/02/02    Acts II Const.                      
                                                            008             4,605                  02/19/03     /  /      Huen New York                       
                                                            008            44,550                  03/12/03   03/19/03    S&D Enterprises                     
                                                            009             8,682           8,682  03/12/03   Disapproved S&D Enterprises                     
                                                            010             6,785                  03/12/03   03/19/03    S&D Enterprises                     
                                                            011             1,147                  04/14/03   04/17/03    HJ Brandeles                        
                                                            011             8,556                  08/20/04   09/17/04    Huen New York                       
                                                            013             1,872                  08/02/02   12/06/04    Bette & Cring                       
                                                            017             6,495                  02/18/03   02/24/03    Huen New York                       
                                                            018            14,418                  11/22/02   12/17/04    Bette & Cring                       
                                                            019             9,654                  02/18/03   02/25/03    Bette & Cring                       
                                                            021             5,312           5,105  02/19/03   11/29/04    Bette & Cring                       
                                                            023           -54,721                  02/19/03   03/11/03    Bette & Cring                       
                                                            024              -267                  05/30/03   06/09/03    Bette & Cring                       
                                                            026               382                  04/01/03   04/03/03    Bette & Cring                       
                                                            027               705                  04/14/03   04/17/03    Bette & Cring                       
                                                            028            -6,476                  05/01/03   05/02/03    Bette & Cring                       
                                                            029             1,700                  05/12/04   07/09/04    Bette & Cring                       
 
09-0091   Reconstruction               0-013-012  12/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          28,185                  12/29/10   06/24/11    PATRICIA ELECTRIC INC               
                                                            E-002           1,276                  02/03/11   03/03/11    PATRICIA ELECTRIC INC               
                                                            E-009           2,683                  07/19/11   08/05/11    PATRICIA ELECTRIC INC               
                                                            E-012          12,661                  08/23/11   11/08/11    PATRICIA ELECTRIC INC               
                                                            E-013          11,912                  11/17/11   05/15/12    PATRICIA ELECTRIC INC               
                                                            E-014          13,031                  11/17/11   05/15/12    PATRICIA ELECTRIC INC               
                                                            E-015           4,719                  12/07/11   05/15/12    PATRICIA ELECTRIC INC               
                                                            E-017           7,399                  12/07/11   05/15/12    PATRICIA ELECTRIC INC               
                                                            E-018          14,659                  02/03/12   05/15/12    PATRICIA ELECTRIC INC               
                                                            E-021           8,130                  07/09/12   07/03/13    PATRICIA ELECTRIC INC               
                                                            G-002          38,387                  09/16/10   09/28/10    BETTE AND CRING LLC                 
                                                            G-005           6,150                  11/26/10   12/31/10    BETTE AND CRING LLC                 
                                                            G-008          30,878                  01/06/11   01/27/11    BETTE AND CRING LLC                 
                                                            G-010         127,451                  02/23/11   03/18/11    BETTE AND CRING LLC                 
                                                            G-012          11,263                  02/23/11   03/18/11    BETTE AND CRING LLC                 
                                                            G-013          32,114                  04/14/11   06/16/11    BETTE AND CRING LLC                 
                                                            G-014          23,132                  04/14/11   06/16/11    BETTE AND CRING LLC                 
                                                            G-015          58,800                  05/06/11   05/25/11    BETTE AND CRING LLC                 
                                                            G-016          31,808                  06/08/11   06/10/11    BETTE AND CRING LLC                 
                                                            G-018          20,561                  08/05/11   09/07/11    BETTE AND CRING LLC                 
                                                            G-019           4,839                  08/05/11   09/07/11    BETTE AND CRING LLC                 
                                                            G-020          20,091                  08/29/11   09/20/11    BETTE AND CRING LLC                 
                                                            G-022          26,640                  08/29/11   09/20/11    BETTE AND CRING LLC                 
                                                            G-026          13,051                  11/09/11   02/03/12    BETTE AND CRING LLC                 
                                                            G-029          22,486                  11/09/11   02/03/12    BETTE AND CRING LLC                 
                                                            G-030          14,102                  11/09/11   02/03/12    BETTE AND CRING LLC                 
                                                            G-031          13,014                  11/09/11   02/03/12    BETTE AND CRING LLC                 
                                                            G-032          29,562                  01/11/12   05/01/12    BETTE AND CRING LLC                 
                                                            G-033           9,268                  01/11/12   05/01/12    BETTE AND CRING LLC                 
                                                            G-035          30,261                  01/27/12   04/27/12    BETTE AND CRING LLC                 
                                                            G-036          25,316                  02/27/12   08/06/12    BETTE AND CRING LLC                 
                                                            G-037          22,457                  02/27/12   08/06/12    BETTE AND CRING LLC                 
                                                            G-038          13,729                  04/13/12   08/30/12    BETTE AND CRING LLC                 
                                                            G-041          16,293                  04/13/12   08/30/12    BETTE AND CRING LLC                 
                                                            G-043          12,296                  09/05/12   12/20/12    BETTE AND CRING LLC                 
                                                            G-045           9,500                  09/05/12   12/20/12    BETTE AND CRING LLC                 
                                                            G-047          14,030                  09/05/12   12/20/12    BETTE AND CRING LLC                 
                                                            G-048          -2,296                  12/06/12   11/22/13    BETTE AND CRING LLC                 
                                                            H-002         -42,256                  09/16/10   09/28/10    LAWMAN HEATING AND COOLING INC      
                                                            H-003          36,182                  04/18/11   05/13/11    LAWMAN HEATING AND COOLING INC      
                                                            H-006           3,605                  07/05/11   11/08/11    LAWMAN HEATING AND COOLING INC      
                                                            H-009          19,929                  02/03/12   05/15/12    LAWMAN HEATING AND COOLING INC      
                                                            H-010          15,778                  02/03/12   05/15/12    LAWMAN HEATING AND COOLING INC      
                                                            H-012          19,148                  02/03/12   05/15/12    LAWMAN HEATING AND COOLING INC      
                                                            H-014          27,220                  08/20/12   12/07/12    LAWMAN HEATING & COOLING INC        
                                                            H-015          -1,637                  11/05/12   08/16/13    LAWMAN HEATING AND COOLING INC      
                                                            P-001          13,243                  09/16/10   09/28/10    BELLUCCI ENTERPRISES INC            
                                                            P-004           2,184                  11/15/10   12/01/10    BELLUCCI ENTERPRISES INC            
                                                            P-005           1,695                  12/29/10   06/24/11    BELLUCCI ENTERPRISES INC            
                                                            P-009           2,077                  04/06/11   04/29/11    BELLUCCI ENTERPRISES INC            
                                                            P-012          19,726                  07/19/11   08/05/11    BELLUCCI ENTERPRISES INC            
                                                            P-013          11,513                  07/19/11     /  /      BELLUCCI ENTERPRISES INC            
                                                            P-014          15,937                  10/05/11   05/15/12    BELLUCCI ENTERPRISES INC            
                                                            P-016          14,109                  10/05/11   05/15/12    BELLUCCI ENTERPRISES INC            
                                                            P-018          11,724                  12/13/11   05/15/12    BELLUCCI ENTERPRISES INC            
                                                            P-020           6,008                  03/23/12   01/25/13    BELLUCCI ENTERPRISES INC            
                                                            P2-001         -3,136                  09/25/12   07/03/13    BURNS BROS CONTRACTORS INC          
 
08-0974   Reconstruction               0-013-013  02/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-001           5,301                  02/19/10   03/30/10    RSI ROOFING INC                     
 
08-1432   Reconstruction               0-013-014  07/10/08  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0587   Reconstruction               0-013-015  12/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            G-001         -55,705                  10/29/13   05/12/16    Murnane Building Contractors, Inc.  
                                                            G-002           5,642                  11/20/13   12/19/13    Murnane Building Contractors, Inc.  
 
16-0132   Reconstruction               0-013-016  08/31/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-01          20,092                  04/05/17     /  /      Core Climate Systems LLC            
 
16-2131   Reconstruction               0-013-017  08/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          4,873                  04/16/18   04/23/18    Continental Construction, LLC       
                                                            GC002           1,932                  06/18/18   06/28/18    CONTINENTAL CONSTRUCTION LLC        
 
19-0413   Additions and Alterations    0-013-018  01/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            BMSC-001        2,345                  04/16/21   07/27/21    CORE CLIMATE SYSTEMS, LLC           
                                                            BMSC-002       -2,431                  11/30/22   06/01/23    Core Climate Systems LLC            
                                                            EC-001         -5,742                  10/19/20   12/29/20    WARSON ELECTRIC, INC.               
                                                            EC-002          7,810                  12/10/20   02/24/21    WATSON ELECTRIC, INC.               
                                                            EC-003         10,443                  12/10/20   02/24/21    WATSON ELECTRIC, INC.               
                                                            EC-004          9,199                  12/10/20   02/24/21    WATSON ELECTRIC, INC.               
                                                            EC-005          1,683                  03/05/21   04/29/21    WATSON ELECTRIC, INC.               
                                                            EC-006          8,775                  06/21/21   02/01/22    Watson Electric Inc                 
                                                            EC-007         26,110                  06/23/21   10/12/21    Watson Electric Inc                 
                                                            EC-008         19,605                  11/15/21   12/12/22    Waston Electric, Inc                
                                                            EC-009         -4,732                  01/20/22   11/08/22    Watson Elec Inc                     
                                                            FSE-001         3,719                  09/18/20   11/12/20    JOSEPH FLIHAN CO.                   
                                                            FSE-002         3,210                  03/15/21   06/18/21    JOSEPH FLIHAN CO.                   
                                                            FSE-003         2,592                  06/21/21   02/01/22    Joseph Flihan                       
                                                            GC-001         -2,761                  08/06/20   09/24/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-002       -165,338                  08/06/20   09/24/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-004         13,074                  09/30/20   02/09/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-005         22,976                  09/30/20   02/09/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-006         17,934                  09/30/20   02/09/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-007         13,591                  09/30/20   02/09/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-008         13,455                  11/20/20   02/19/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-009         11,259                  11/20/20   02/19/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-010         14,891                  03/05/21   06/24/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-011         22,631                  03/05/21   06/24/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-013         25,442                  03/05/21   06/24/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-014          6,668                  03/05/21   06/24/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-015            912                  04/16/21   06/23/21    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-016         18,837                  06/23/21   03/14/22    Bebe Construction Services          
                                                            GC-017         20,075                  06/23/21   03/14/22    Beebe Construction Services         
                                                            GC-018         18,509                  06/23/21   03/14/22    Beebe Construction Services         
                                                            GC-019         18,159                  06/23/21   03/14/22    Beebe Construction Services         
                                                            GC-020         22,376                  07/06/21   03/16/22    Beebee Construction Services        
                                                            GC-021         28,209                  07/06/21   03/16/22    Beebe Construction Services         
                                                            GC-022          6,372                  09/22/21   11/30/22    Beebe Construction Services, Inc    
                                                            GC-023          3,080                  10/12/21   12/02/22    Beebe Const Services, Inc           
                                                            GC-024         12,775                  01/18/22   12/27/22    Beebe Const Servs Inc               
                                                            GC-025          2,305                  01/24/22   01/31/23    Beebe Const Servs Inc               
                                                            GC-026            478                  03/18/22   03/29/23    Beebe Const Servs Inc               
                                                            MC-001         10,200                  08/06/20   10/06/20    LAWMAN HEATING & COOLING, INC.      
                                                            MC-002          3,463                  10/19/20   12/29/20    LAWMAN HEATING & COOLING, INC.      
                                                            MC-003          7,149                  11/20/20   02/04/21    LAWMAN HEATING & COOLING, INC.      
                                                            MC-004         21,727                  01/15/21   03/17/21    LAWMAN HEATING & COOLING, INC.      
                                                            MC-005          7,050                  11/15/21   12/12/22    Lawman Heat&Cool Inc                
                                                            PC-001          9,011                  11/27/20   01/29/21    BELLUCCI ENTERPRISES, INC.          
                                                            PC-002         17,788                  06/28/21   11/16/21    Bellucci Enterprises Inc            
                                                            PC-003            839                  09/10/21   11/29/22    Bellucci Enterprises, Inc           
                                                            PC-004          6,148                  10/04/21   11/22/22    Bellucci Enterprises, Inc           
                                                            SC-001         21,839                  01/19/21   06/15/21    FRED BURROWS TRUCKING & EXCAVATING  
                                                            SC-002         31,500                  01/19/21   06/15/21    FRED BURROWS TRUCKING & EXCAVATING  
                                                            SC-003         24,167                  04/19/21   07/08/21    FRED BURROWS TRUCKING & EXCAVATING  
                                                            SC-004         17,550                  04/19/21   07/08/21    FRED BURROWS TRUCKING & EXCAVATING  
                                                            SC-005         33,300                  04/19/21   07/08/21    FRED BURROWS TRUCKING & EXCAVATING  
                                                            SC-006         10,198                  04/19/21   07/08/21    FRED BURROWS TRUCKING & EXCAVATING  
                                                            SC-007         18,786                  04/19/21   07/08/21    FRED BURROWS TRUCKING & EXCAVATING  
                                                            SC-008         26,398                  04/19/21   07/08/21    FRED BURROWS TRUCKING & EXCAVATIMG  
                                                            SC-009         21,740                  07/06/21   03/16/22    Fred Burrows Trucking & Excavating  
                                                            SC-010         23,563                  09/10/21   11/29/22    Fred Burrows Trucking & Excavating  
                                                            SC-011         24,632                  09/27/21   06/14/22    Fred Burrows Trucking&Excavating    
                                                            SC-012         14,747                  09/27/21   06/14/22    Fred Burrows Trucking&Excavating    
                                                            SC-013         33,040                  09/27/21   06/14/22    Fred Burrows Trucking&Excavating    
                                                            SC-014         29,956                  09/27/21   06/14/22    Fred Burrows Trucking&Excaving      
 
17-1898   Reconstruction               0-013-019  06/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1291   Reconstruction               0-013-020  01/25/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-2072   Reconstruction               0-013-021  07/12/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1642   Reconstruction               0-013-022  06/18/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0448   Reconstruction               0-013-023  10/27/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0006   Reconstruction               0-013-025  09/16/22  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0235EP Energy Project               0-013-E01  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Biomass Boiler Bldg.@ES-MS-HS:
22-1814   Reconstruction               0-018-003  05/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage @ Constanbleville:
93-1497   Reconstruction               4-002-001  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
93-1300   Reconstruction               5-001-001  06/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0145   Reconstruction               5-001-002  08/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1102   Reconstruction               5-001-003  04/07/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0867   Additions and Alterations    5-001-004  08/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -4,600                  06/06/02   07/10/02    Safe Environ. of America            
                                                            001            16,890                  09/04/02   09/05/02    S&D Enterprises                     
                                                            002             2,353                  04/29/02   05/09/02    Bette & Cring                       
                                                            002            17,812                  04/29/02   12/13/04    HJ Brandeles                        
                                                            002             6,300                  06/06/02   07/10/02    Acts II Const.                      
                                                            005            16,000                  09/04/02   09/05/02    Acts II Const.                      
                                                            005            -4,000                  09/04/02   09/05/02    HJ Brandeles                        
                                                            007            13,045                  06/04/02   06/05/02    Bette & Cring                       
                                                            007             1,506                  02/18/03   02/24/03    S&D Enterprises                     
                                                            008             4,605                  08/20/04   09/17/04    Huen New York                       
                                                            011             1,531                  08/02/02   08/16/02    Bette & Cring                       
                                                            014             3,028                  11/22/02   12/06/04    Bette & Cring                       
 
09-0092   Reconstruction               5-001-006  12/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-004           3,574                  02/03/11   03/03/11    PATRICIA ELECTRIC INC               
                                                            E-007          10,097                  04/06/11   04/29/11    PATRICIA ELECTRIC INC               
                                                            E-008           2,654                  07/19/11   08/05/11    PATRICIA ELECTRIC INC               
                                                            G-006          26,544                  11/26/10   12/31/10    BETTE AND CRING LLC                 
                                                            G-011          21,510                  02/23/11   03/18/11    BETTE AND CRING LLC                 
                                                            G-021          15,288                  08/29/11   09/20/11    BETTE AND CRING LLC                 
                                                            H-011           5,559                  02/03/12   05/15/12    LAWMAN HEATING AND COOLING INC      
                                                            P-002          13,959                  11/15/10   12/01/10    BELLUCCI ENTERPRISES INC            
                                                            P-003           6,861                  11/15/10   12/01/10    BELLUCCI ENTERPRISES INC            
                                                            P-006           1,007                  12/29/10   06/24/11    BELLUCCI ENTERPRISES INC            
                                                            P-007           1,062                  04/06/11   04/29/11    BELLUCCI ENTERPRISES INC            
 
08-0975   Reconstruction               5-001-007  02/09/09  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0414   Reconstruction               5-001-008  01/06/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003          2,417                  08/06/20   09/24/20    BEEBE CONSTRUCTION SERVICES, INC.   
                                                            GC-012            701                  03/05/21   06/24/21    BEEBE CONSTRUCTION SERVICES, INC.   
 

          Press Box:
02-0111   New Construction             7-016-001  09/23/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBiomassBoilerBldg.@ES-MS-HSsee0018:
09-0093   New Construction             7-018-001  12/21/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-003           6,258                  02/03/11   03/03/11    PATRICIA ELECTRIC INC               
                                                            E-019            -585                  02/03/12   05/15/12    PATRICIA ELECTRIC INC               
                                                            G-001          72,720                  09/16/10   09/28/10    BETTE AND CRING LLC                 
                                                            G-009          20,183                  01/06/11   01/27/11    BETTE AND CRING LLC                 
                                                            G-027           7,480                  11/09/11   02/03/12    BETTE AND CRING LLC                 
                                                            H-001         -33,000                  09/16/10   09/28/10    LAWMAN HEATING AND COOLING INC      
                                                            H-013          13,427                  06/14/12   01/25/13    LAWMAN HEATING AND COOLING INC      
                                                            P-010           5,319                  04/06/11   04/29/11    BELLUCCI ENTERPRISES INC            
                                                            P-019           6,863                  12/13/11   05/15/12    BELLUCCI ENTERPRISES INC            
 
19-0415   Additions and Alterations    7-018-002  01/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Building:
20-1235   New Construction             7-019-001  03/15/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Districtwide Telecommunications:
93-1414   Reconstruction               7-999-001  05/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE

BEAVER RIVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 23-13-01-04
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building K-12:
92-1225   Additions and Alterations    0-002-002  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0144   Reconstruction               0-002-004  08/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0075   Additions and Alterations    0-002-005  10/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              12,750                  04/24/02   05/07/02    Bette & Cring                       
                                                            1              16,288                  09/13/02   10/30/02    Lawman Heating                      
                                                            1               3,060                  10/04/02   11/01/02    Empire Northeast                    
                                                            1               9,458                  11/14/02   01/03/03    Meacham Elec.                       
                                                            1                -350                  09/22/03   10/03/03    Gouvernor Roofing                   
                                                            1                -100                  08/10/04   08/13/04    CFI Const.                          
                                                            1-002          -3,466                  08/23/04   09/17/04    CFI Const.                          
                                                            10              1,159                  01/28/03   02/11/03    Bette & Cring                       
                                                            10              2,488                  07/23/03   08/04/03    Lawman Heating                      
                                                            10             11,938                  10/14/03   11/06/03    Meacham Elec.                       
                                                            10             14,964                  11/14/03     /  /      Empire Northeast                    
                                                            11              9,721                  09/15/03   09/23/03    Lawman Heating                      
                                                            11             13,192                  11/14/03     /  /      Meacham Elec.                       
                                                            11              9,037                  01/20/04   01/29/04    Empire Northeast                    
                                                            12             28,592                  03/05/03   03/19/03    Bette & Cring                       
                                                            12              3,465                  11/14/03   11/21/03    Lawman Heating                      
                                                            12            -51,737                  01/20/04   10/17/07    Meacham Elec.                       
                                                            12             -3,780                  08/10/04   08/13/04    Empire Northeast                    
                                                            13              1,785                  03/05/03   03/19/03    Bette & Cring                       
                                                            13             38,641          42,109  09/23/04   10/01/04    Lawman Heating                      
                                                            14              4,844                  03/18/03   03/19/03    Bette & Cring                       
                                                            15              9,491                  04/14/03   04/17/03    Bette & Cring                       
                                                            16             16,352                  05/27/03   06/10/03    Bette & Cring                       
                                                            17             16,090                  06/26/03   07/01/03    Bette & Cring                       
                                                            18             19,128                  06/26/03   07/01/03    Bette & Cring                       
                                                            19              5,150                  07/23/03   08/04/03    Bette & Cring                       
                                                            2              25,302                  09/13/02   10/30/02    Bette & Cring                       
                                                            2              14,881                  10/03/02   11/01/02    Lawman Heating                      
                                                            2              13,558                  11/18/02   01/03/03    Empire Northeast                    
                                                            2              14,390                  01/28/03   02/11/03    Meacham Elec.                       
                                                            2              -8,573                  10/09/03   11/06/03    Gouverneur Roofing                  
                                                            2-003           1,370                  10/15/02   12/02/02    Bette & Cring                       
                                                            2-004          24,029                  10/15/02   12/02/02    Bette & Cring                       
                                                            2-005          64,855                  10/15/02   12/02/02    Bette & Cring                       
                                                            2-006          16,473                  10/15/02   12/02/02    Bette & Cring                       
                                                            2-011          16,360                  03/05/03   03/19/03    Bette & Cring                       
                                                            2-024          17,942                  03/20/08   04/07/08    BETTE & CRAIG, LLC                  
                                                            2-025          64,185                  03/15/04   03/30/04    Bette & Cring                       
                                                            2-026          94,000                  03/15/04   03/30/04    Bette & Cring                       
                                                            2-027          -1,681                  08/10/04   08/13/04    Bette & Cring                       
                                                            2-028          98,400          98,400  11/15/04   11/24/04    Bette & Cring                       
                                                            2-029           3,888                  11/15/04   11/24/04    Bette & Cring                       
                                                            20             24,353                  09/22/03   10/03/03    Bette & Cring                       
                                                            22             27,637                  10/09/03   11/06/03    Bette & Cring                       
                                                            23             52,120                  11/14/03     /  /      Bette & Cring                       
                                                            23             52,120                  03/20/08     /  /      BETTE & CRAIG, LLC                  
                                                            3               6,388                  11/14/02   01/03/03    Lawman Heating                      
                                                            3              18,949                  01/22/03   02/06/03    Meacham Elec.                       
                                                            3               1,416                  12/05/03   12/09/03    Empire Northeast                    
                                                            4               3,644                  11/14/02   01/03/03    Empire Northeast                    
                                                            4               2,038                  01/07/03   01/14/03    Lawman Heating                      
                                                            4               7,822                  03/27/03   04/03/03    Meacham Elec.                       
                                                            5               2,312                  01/16/03   02/06/03    Empire Northeast                    
                                                            5               1,278                  01/28/03   02/11/03    Lawman Heating                      
                                                            5               5,234                  06/26/03   07/01/03    Meacham Elec.                       
                                                            6               4,290                  01/28/03   02/11/03    Lawman Heating                      
                                                            6               3,835                  03/27/03   04/03/03    Empire Northeast                    
                                                            6              12,186                  08/20/03   09/09/03    Meacham Elec.                       
                                                            6             -12,653                  12/24/07   03/19/08    MEACHAM ELECTRICAL CONTRACTORS      
                                                            7              10,116                  11/14/02   01/03/03    Bette & Cring                       
                                                            7               6,594                  02/24/03   03/11/03    Lawman Heating                      
                                                            7               9,075                  04/14/03   04/17/03    Empire Northeast                    
                                                            7               7,980                  07/23/03   08/04/03    Meacham Elec.                       
                                                            8               4,634                  11/18/02   01/03/03    Bette & Cring                       
                                                            8               1,397                  03/27/03   04/03/03    Lawman Heating                      
                                                            8               6,304                  06/26/03   07/01/03    Empire Northeast                    
                                                            8               5,346                  08/20/03   09/09/03    Meacham Elec.                       
                                                            9              -8,675                  01/22/03   02/06/03    Bette & Cring                       
                                                            9                 565                  04/14/03   04/17/03    Lawman Heating                      
                                                            9               6,186                  07/23/03   08/04/03    Empire Northeast                    
                                                            9               2,103                  09/15/03   09/23/03    Meacham Elec.                       
 
00-1336   Reconstruction               0-002-007  03/24/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            21            103,173                  09/22/03   10/03/03    Bette & Cring                       
                                                            e-03           10,277                  06/19/12   11/13/12    Huen New York                       
 
10-0696   Additions and Alterations    0-002-008  07/26/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -37,652                  11/09/11   02/03/12    CON TECH BUILDING SYSTEMS           
                                                            1-02          -12,263                  04/13/12   08/30/12    CON TECH BUILDING SYSTEMS           
                                                            1-03           67,715                  09/06/12   12/20/12    CON TECH BUILDING SYSTEMS           
                                                            1-04           -6,868                  02/05/13   04/26/13    CON TECH BUILDING SYSTEMS           
                                                            1-05           -1,260                  03/08/13   05/31/13    CON TECH BUILDING SYSTEMS           
                                                            1-06           -2,500                  04/15/13   11/22/13    CON TECH BUILDING SYSTEMS           
                                                            2-01          -10,329                  02/09/12   05/15/12    BURNS BROS CONTRACTORS              
                                                            2-01           -6,917                  09/14/12   01/08/13    DAVIS MECHANICAL SERVICES INC       
                                                            2-02          -18,129                  10/03/12   02/11/13    BURNS BROS. CONTRACTORS             
                                                            3-01             -936                  01/13/12   04/30/12    HUEN NEW YORK                       
                                                            3-02           -1,368                  05/02/12   11/22/13    HUEN NEW YORK                       
                                                            3-03           10,277                  10/25/12   02/20/13    HUEN NEW YORK                       
                                                            3-04           -3,758                  09/14/12   01/08/13    HUEN NEW YORK                       
                                                            4-01            2,790                  03/16/12   08/06/12    PROFESSIONAL FURNISHINGS            
                                                            5-01          -11,992                  11/09/11   01/18/12    SYRACUSE SCENERY & STAGE LIGHTING   
                                                            5-02           11,992                  03/23/12   08/08/12    SYRACUSE SCENERY & STAGE LIGHTING   
                                                            FO100-01       -4,454                  09/06/12   12/20/12    CON TECH BUILDING SYSTEMS           
                                                            FO100-02      -10,100                  09/06/12   12/20/12    CON TECH BUILDING SYSTEMS           
                                                            FO200-01            0                  10/03/12   02/21/13    BURNS BROS. CONTRACTORS             
                                                            FO200-02            0                  10/03/12   02/21/13    BURNS BROS CONTRACTORS              
                                                            FO300-01            0                  09/14/12   01/09/13    HUEN NEW YORK                       
                                                            FO300-02            0                  09/14/12   01/09/13    HUEN NEW YORK                       
                                                            FO300-03            0                  09/14/12   01/09/13    HUEN NEW YORK                       
                                                            FO300-04            0                  09/14/12   01/09/13    HUEN NEW YORK                       
                                                            FO300-05            0                  09/14/12   01/09/13    HUEN NEW YORK                       
 
13-0731   Reconstruction               0-002-009  11/17/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            3-01             -485                  09/09/15   09/18/15    Putrelo Building Enterprises, Inc.  
                                                            3-02           46,141                  08/13/15   08/26/15    Putrelo Building Enterprises, Inc.  
                                                            3-03           10,225                  09/03/15   09/09/15    Putrelo Building Enterprises Inc.   
                                                            3-04           -8,337                  10/15/15   11/18/15    Putrelo Building Enterprises, Inc.  
                                                            3-05             -802                  12/17/15   01/07/16    PUTRELO BUILDING ENTERPRISES,INC    
                                                            3-06          -23,759                  09/22/16   01/08/18    Putrelo Building Enterprises, Inc.  
                                                            300-03         -7,360                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            300-04         -6,706                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            300-05         -1,913                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            300-06         -2,980                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            300-07           -565                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            300-08         -1,601                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            300-09         -1,000                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            300-10         -4,623                  09/22/16   01/08/18    Putrelo Building Enterprise         
                                                            4-01           45,131                  11/25/15   12/23/15    Lawman Heating & Cooling            
                                                            4-02            4,209                  02/11/16   02/19/16    Lawman Heating & Cooling            
                                                            400-04              0                  11/25/15   12/23/15    Lawman Heating & Cooling            
                                                            400-05              0                  11/25/15   12/23/15    Lawman Heating & Cooling            
                                                            400-06              0                  11/25/15   12/23/15    Lawman Heating & Cooling            
                                                            5-01            6,151                  12/02/15   01/07/16    Burns Brots Contractractor          
                                                            500-01              0                  12/02/15   01/07/16    Burns Bros. Contractors             
                                                            500-02              0                  12/02/15   01/07/16    Burns Bros. Contractors             
                                                            6-01           17,091                  08/24/15   09/01/15    Dow Electric                        
                                                            6-02            7,391                  11/16/15   01/08/18    Dow Electric                        
                                                            6-03           10,630                  12/16/15   01/06/16    DOW Electric                        
                                                            600-01         -2,799                  09/22/16   01/08/18    Dow Electric                        
                                                            600-02           -512                  09/22/16   01/08/18    Dow Electric                        
                                                            600-03         -1,144                  09/22/16   01/08/18    Dow Electric                        
                                                            600-04         -3,358                  09/22/16   01/08/18    Dow Electric                        
 
13-0888   Reconstruction               0-002-010  10/08/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            5,236                  08/01/14   09/04/14    Northern Tier Contracting           
                                                            100-01              0                  08/01/14   09/04/14    Northern Tier Contracting           
 
13-0669   Reconstruction               0-002-011  02/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-01           -1,650                  05/30/14   06/30/14    Cunningham Excavating, Inc.         
                                                            2-02           -4,014                  10/16/14   10/21/14    Cunningham Excavation, Inc.         
 
14-0822   Reconstruction               0-002-012  03/06/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            6,625                  10/01/15   11/19/15    B&D Enterprises of NNY              
                                                            1-02           -5,516                  12/16/15   01/06/16    B&D Enterprises of NY               
                                                            1-03           -4,000                  03/15/16   03/18/16    B&D Enterprises of NNY              
                                                            300-01        -21,308                  09/22/16   09/10/20    Putrelo Building Enterprise         
                                                            300-02         -3,183                  09/22/16   09/10/20    Putrelo Building Enterprise         
                                                            400-01              0                  11/25/15   12/23/15    Lawman Heating & Cooling            
                                                            400-02              0                  11/25/15   12/23/15    Lawman Heating & Cooling            
                                                            400-03              0                  11/25/15   12/23/15    LawmanHeating & Cooling             
 
15-0639   Reconstruction               0-002-013  06/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0050   Reconstruction               0-002-014  12/02/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           13,260                  08/16/17   09/07/17    Northern Tier Contracting Inc.      
                                                            1-02            4,524                  08/16/17   09/07/17    Northern Tier Contracting Inc.      
                                                            1-03            2,483                  09/19/17   10/13/17    Northern Tier Contracting Inc.      
                                                            1-04            1,577                  09/19/17   10/13/17    Northern Tier Contracting Inc.      
                                                            1-05            7,231                  12/29/17   01/23/18    Northern Tier Contracting, Inc.     
                                                            1-06            4,066                  11/29/17   02/14/18    Northern Tier Contracting Inc.      
                                                            1-07           24,038                  12/19/17   01/23/18    Northern Tier Contracting Inc.      
                                                            100-01              0                  02/02/18   02/21/18    Northern Tier Contracting Inc.      
                                                            100-02              0                  02/02/18   02/21/18    Northern Tier Contracting Inc.      
                                                            100-03              0                  02/02/18   02/21/18    Northern Tier Contracting Inc.      
                                                            100-04              0                  02/02/18   02/21/18    Northern Tier Contracting Inc.      
                                                            100-05              0                  02/02/18   02/21/18    Northern Tier Contracting Inc.      
                                                            100-06              0                  02/02/18   02/21/18    Northern Tier Contracting Inc.      
                                                            100-07              0                  02/02/18   02/21/18    Northern Tier Contracting Inc.      
                                                            100-08              0                  08/08/17   08/11/17    Northern Tier Contracting Inc.      
                                                            2-01            8,449                  08/25/17   10/10/17    Black River Plumbing, Heating, & AC 
                                                            2-02           15,827                  08/25/17   10/10/17    Black River Plumbing, Heating, & AC 
                                                            2-03           11,713                  08/25/17   10/10/17    Black River Plumbing, Heating, & AC 
                                                            2-04            1,040                  10/10/17   11/10/17    Black River Plumbing, Heating, & AC 
                                                            2-05           11,214                  10/10/17   11/10/17    Black River Plumbing, Heating, & AC 
                                                            2-06           19,818                  10/10/17   11/10/17    Black River Plumbing, Heating, & AC 
                                                            2-07           19,818                  10/10/17   11/10/17    Black River Plumbing, Heating, & AC 
                                                            2-08              827                  11/08/17   12/01/17    Black River Plumbing, Heating, & AC 
                                                            2-09            9,360                  12/05/17   02/13/18    Black River Plumbing, Heating, & AC 
                                                            200-01              0                  02/02/18   03/08/18    Black River Plumbing, Heating, AC   
                                                            3-01           10,281                  12/29/17   01/23/18    J.E. Sheehan Contracting Corp.      
                                                            3-02               91                  12/29/17   01/23/18    J.E. Sheehan Contracting Corp.      
                                                            3-03           -1,268                  12/12/17   02/02/18    J.E. Sheehan Contracting Corp.      
                                                            3-03           -1,268                  12/29/17   01/23/18    J.E. Sheehan Contracting Corp.      
                                                            300-01              0                  02/02/18   03/08/18    J.E. Sheehan Contracting Corporation
                                                            300-02              0                  02/02/18   03/08/18    J.E. Sheehan Contracting Corporation
                                                            300-03              0                  02/02/18   03/08/18    J.E. Sheehan Contracting Corporation
                                                            400-01              0                  02/02/18   02/20/18    AMP Electric R.S., LLC              
                                                            400-02              0                  08/25/17   10/10/17    AMP Electric R.S., LLC              
                                                            400-03              0                  09/19/17   10/12/17    AMP Electric R.S., LLC              
                                                            400-04              0                  10/27/17   11/30/17    AMP Electric R.S., LLC              
 
16-0903   Reconstruction               0-002-015  01/31/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0227   Reconstruction               0-002-016  11/08/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -2,154                  08/30/18   09/20/18    DOW ELECTRIC                        
                                                            1-02            2,250                  11/30/18   01/08/19    DOW ELECTRIC                        
                                                            100-01              0                  05/03/19   05/07/19    DOW ELECTRIC                        
 
18-0036   Reconstruction               0-002-017  12/11/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -3,000                  09/12/19   09/24/19    AMP ELECTRIC R.S., INC.             
 
18-2163   Reconstruction               0-002-018  12/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02               0                  07/17/20   08/26/20    NORTHERN PIONEERS CONTRACTORS, INC. 
                                                            EC-05               0                  08/21/20   10/29/20    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-07          -1,903                  02/04/21   03/26/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-08               0                  02/04/21   03/26/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-09               0                  10/22/20   12/30/20    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-12               0                  02/23/21   04/05/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            FC-04         -12,780                  12/07/21   12/16/22    LaValley Cros Const Inc             
                                                            GC-01               0                  06/30/20   08/06/20    BETTE & CRING, LLC                  
                                                            GC-02               0                  06/30/20   08/06/20    BETTE & CRING, LLC                  
                                                            GC-03               0                  06/30/20   08/06/20    BETTE & CRING, LLC                  
                                                            GC-05               0                  06/30/20   08/06/20    BETTE & CRING, LLC                  
                                                            GC-07               0                  07/17/20   09/08/20    BETTE & CRING, LLC                  
                                                            GC-08               0                  07/17/20   09/08/20    BETTE & CRING, LLC                  
                                                            GC-09               0                  12/02/20   02/23/21    BETTE & CRING, LLC                  
                                                            GC-11               0                  04/05/21   05/05/21    BETTE & CRING, LLC                  
                                                            GC-13        -138,009                  07/26/21   05/24/22    Bette & Cring LLC                   
                                                            HVAC-01             0                  06/30/20   07/28/20    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-02             0                  08/04/20   10/05/20    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-03             0                  02/04/21   03/26/21    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-04             0                  02/23/21   04/05/21    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-07             0                  03/11/21   05/04/21    LAWMAN HEATING & COOLING, INC.      
                                                            PC-01               0                  02/04/21   03/26/21    SKELLY CONTRACTORS, INC.            
                                                            PC-03               0                  10/07/20   12/03/20    SKELLY CONTRACTORS, INC.            
                                                            PC-04               0                  01/11/21   03/10/21    SKELLY CONTRACTORS, INC.            
                                                            PC-05               0                  02/04/21   03/26/21    SKELLY CONTRACTORS, INC.            
                                                            PC-06               0                  03/05/21   04/29/21    SKELLY CONTRACTORS, INC.            
                                                            RC-01               0                  02/04/21   04/28/21    RSI ROOFING, INC.                   
                                                            RC-02         -29,321                  02/04/21   04/28/21    RSI ROOFING, INC.                   
 
19-1676   Reconstruction               0-002-019  06/22/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,000                  01/15/21   03/17/21    AMP ELECTRIC R.S., LLC              
 
20-1386   Reconstruction               0-002-020  04/15/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           1,312                  08/26/21   11/25/22    WATSON ELECTRIC, INC                
 
21-1011   Reconstruction               0-002-021  02/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01               0                  03/29/23   12/21/23    WHITTON CONSRTUCTION LLC            
                                                            GC-02            -139                  03/29/23   12/21/23    WHITTON CONSTRUCTION LLC            
 
22-0726   Reconstruction               0-002-022  02/14/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXBus Garage-SoldMarch2021:
92-1224   Additions and Alterations    5-001-002  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0145   Reconstruction               5-001-003  08/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0077   Reconstruction               5-001-004  10/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
18-2164   New Construction             5-004-001  12/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01               0                  06/30/20   07/28/20    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-03               0                  07/17/20   08/26/20    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-04               0                  08/04/20   10/05/20    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-06               0                  02/04/21   03/26/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-10               0                  12/14/20   02/22/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-11               0                  02/23/21   04/05/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-13               0                  02/23/21   04/05/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-14               0                  02/23/21   04/05/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-15               0                  02/23/21   04/05/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-16               0                  02/23/21   04/05/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-17               0                  03/11/21   05/04/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            EC-18         -20,989                  03/11/21   05/04/21    NORTHERN PIONEER CONTRACTORS, INC.  
                                                            FC-01               0                  02/04/21   03/26/21    LAVALLEY BROS. CONSTRUCTION, INC.   
                                                            FC-02               0                  02/04/21   03/26/21    LAVALLEY BROS. CONSTRUCTION, INC.   
                                                            FC-03          -1,242                  03/16/21   05/04/21    LAVALLEY BROS. CONSTRUCTION, INC.   
                                                            GC-04               0                  06/30/20   08/06/20    BETTE & CRING, LLC                  
                                                            GC-06               0                  07/17/20   09/08/20    BETTE & CRING, LLC                  
                                                            GC-10               0                  12/02/20   02/23/21    BETTE & CRING, LLC                  
                                                            GC-12         -15,039                  04/05/21   05/05/21    BETTE & CRING, LLC                  
                                                            HVAC-05             0                  02/23/21   04/05/21    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-06             0                  03/04/21   04/21/21    LAWMAN HEATING & COOLING, INC.      
                                                            HVAC-08             0                  07/15/21   12/14/21    Lawman Heating & Cooling Inc        
                                                            HVAC-09       -72,723                  06/10/21   10/21/21    Lawman Heating & Cooling            
                                                            PC-02               0                  02/04/21   03/26/21    SKELLY CONTRACTORS, INC.            
                                                            PC-07               0                  03/05/21   04/29/21    SKELLY CONTRACTORS, INC.            
                                                            PC-09               0                  07/28/21   03/29/22    SKELLY CONTRACTORS, INC             
                                                            PC-10          15,917                  07/28/21   03/29/22    SKELLY CONTRACTORS, INC             
                                                            SC-01               0                  02/04/21   04/28/21    JL EXCAVATING, LLC                  
                                                            SC-02               0                  02/04/21   04/28/21    JL EXCAVATING, LLC                  
                                                            SC-03               0                  02/04/21   04/28/21    JL EXCAVATING, LLC                  
                                                            SC-04               0                  02/04/21   05/18/21    JL EXCAVATING, LLC                  
                                                            SC-05               0                  01/08/21   04/21/21    JL EXCAVATION, LLC                  
                                                            SC-06          16,729                  03/16/21   05/05/21    JL EXCAVATION, LLC                  
 

          District-Wide:
16-1330   Reconstruction               7-999-001  08/11/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -5,342                  01/15/19   02/11/19    BLACK RIVER PLUMBING HEATING AC     
                                                            100-01              0                  05/03/19   05/07/19    BLACK RIVER PLUMBING,HEATING,AC     
                                                            100-02              0                  05/03/19   05/07/19    BLACK RIVER PLUMBING, HEATING & AC  
                                                            100-03              0                  05/03/19   05/07/19    BLACK RIVER PLUMBING, HEATING & AC  
                                                            2-01              986                  02/20/19   03/01/19    LAWMAN HEATING & COOLING,INC.       
                                                            201-003             0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING            
                                                            201-004             0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING            
                                                            201-005             0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING            
                                                            201-006             0                  05/03/19   05/07/19    LAWMAN HEATING & C00LING            
                                                            201-007             0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING            
                                                            201-008             0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING            
                                                            201-009             0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING            
                                                            201-01              0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING            
                                                            201-02              0                  05/03/19   05/07/19    LAWMAN HEATING & COOLING