Change Order Status - Essex


CROWN POINT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-02-03-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
91-0034   Alterations                  0-001-004  08/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1205   Reconstruction               0-001-005  05/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0620   Reconstruction               0-001-006  03/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0564   Reconstruction               0-001-007  01/22/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1110   Reconstruction               0-001-008  05/18/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0922   Reconstruction               0-001-009  05/18/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1675   Reconstruction               0-001-010  07/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1237   Additions and Alterations    0-001-011  09/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 686                  04/16/02   05/10/02    Brockway Mech.                      
                                                            1               7,976                  05/06/02   05/13/02    LH LaPlante Company                 
                                                            1               1,894                  05/06/02   05/13/02    LH LaPlante Company                 
                                                            1              12,774                  09/05/02   10/21/02    S&R Const.                          
                                                            1.1            36,582                  02/21/03   03/12/03    Marcor Remediations                 
                                                            2               5,346                  09/13/02   10/28/02    LH LaPlante Company                 
                                                            2               9,192                  09/30/02   10/02/02    S&R Const.                          
                                                            2.1            -6,000                  02/21/03   03/12/03    Marcor Remediations                 
                                                            2A             26,416                  09/30/02   10/02/02    S&R Const.                          
                                                            3              18,355                  09/30/02   10/02/02    S&R Const.                          
                                                            4              17,112                  09/30/02   01/14/03    S&R Const.                          
                                                            5               7,373                  09/30/02   10/02/02    S&R Const.                          
                                                            6             -11,395                  09/30/02   10/02/02    S&R Const.                          
                                                            6              -3,941                  02/15/06   07/21/06    Debrino Caulking Ass                
                                                            7               9,457                  09/30/02   01/14/03    S&R Const.                          
                                                            8              -1,000                  04/11/03   04/18/03    S&R Const.                          
                                                            CA-1          -25,000                  01/18/02   03/22/02    S&R Const.                          
                                                            CA-2            4,328                  01/18/02   03/22/02    S&R Const.                          
                                                            CA-3           42,618                  02/07/02   03/22/02    S&R Const.                          
                                                            CA-4            1,755                  09/04/02   10/21/02    S&R Const.                          
                                                            CA-5            4,380                  11/08/02   03/13/03    S&R Const.                          
                                                            CS-1            2,950                  09/04/02   10/21/02    Ed and Tom O'Connor Const.          
                                                            EA-1           15,788                  03/04/02   04/29/02    All Phase Electric                  
                                                            EC-1            2,495                  10/10/02   10/28/02    William J. Murray                   
                                                            HG-1            5,023                  02/15/06   06/23/06    LH Laplante Co                      
 
08-0240   Reconstruction               0-001-012  02/11/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-CO.01        17,374                  04/09/13   07/03/14    ALL PHASE ELECTRIC                  
                                                            GC-CO.01      -27,216                  11/23/09   12/17/09    RIZNICK CONSTRUCTION CORPORATION    
                                                            M-CO.01        -1,923                  02/12/10   04/16/10    BROCKWAY MECHANICAL SYSTEMS INC     
                                                            P-CO.01       -31,881                  11/05/09   01/08/10    BROCKWAY MECHANICAL SYSTEMS, INC.   
 
07-2065   Reconstruction               0-001-013  06/02/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01          21,958                  09/24/08   10/21/08    MONAHAN BROTHERS,INC                
 
18-0133   Reconstruction               0-001-014  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1063   Reconstruction               0-001-015  04/07/17  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0368   Reconstruction               0-001-016  06/01/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO.01      -14,115                  04/01/20   07/13/20    MURNANE BUILDING CONTRACTORS, INC.  
 
17-0852   Reconstruction               0-001-017  06/01/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO.01      -14,115                  04/01/20   07/13/20    MURNANE BUILDING CONTRACTORS, INC.  
 
21-0389   Reconstruction               0-001-018  09/29/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -13,000                  10/17/22   12/19/23    Mid-State Industries Ltd            
 
03-0078FP Reconstruction               0-001-FP1  10/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
97-1676   Reconstruction               5-002-002  07/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage:
00-0236   New Construction             5-003-001  01/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2                -549                  04/16/02   05/30/02    Brockway Mech.                      
                                                            E-1             1,401                  12/10/01   02/28/02    Brownell Elec.                      
                                                            E-2             1,835                  02/01/02   03/18/02    Brownell Elec.                      
                                                            E-3               484                  02/12/02   04/04/02    Brownell Elec.                      
                                                            GC-3            7,940                  02/12/02   04/04/02    S&R Const.                          
                                                            GC-4            1,254                  12/12/01   01/08/02    S&R Const.                          
 

ELIZABETHTOWN-LEWIS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-03-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
99-0434   Reconstruction               0-001-003  02/18/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0428   Additions and Alterations    0-001-004  07/03/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -38,325                  12/07/04   12/10/04    K&L Plumbing                        
                                                            10                  0                  03/09/04   05/06/04    K&L Plumbing                        
                                                            10                  0                  07/07/04   07/19/04    Bayview Elec.                       
                                                            11                  0                  07/20/04   07/27/04    K&L Plumbing                        
                                                            11A                 0                  07/20/04   07/27/04    Bayview Elec.                       
                                                            12                  0                  03/09/04   05/06/04    K&L Plumbing                        
                                                            3             -16,474                  12/07/04   12/10/04    Bayview Elec.                       
                                                            35             75,457                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            4                   0                  03/09/04   05/06/04    Bayview Elec.                       
                                                            45                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            48                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            49                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            5                   0                  03/09/04   05/06/04    Bayview Elec.                       
                                                            50                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            51                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            52                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            53                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            54                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            55                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            56                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            57                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            58                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            59                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            6                   0                  07/07/04   07/19/04    Bayview Elec.                       
                                                            6-P                 0                  03/09/04     /  /      K&L Plumbing                        
                                                            60                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            61                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            62                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            63                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            64                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            65                  0                  03/09/04   04/06/04    Murnane Building Contractors        
                                                            66                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            67                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            68                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            69                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            70                  0                  03/09/04     /  /      Murnane Building Contractors        
                                                            71                  0                  05/26/04   05/27/04    Murnane Building Contractors        
                                                            72                  0                  05/26/04   05/27/04    Murnane Building Contractors        
                                                            73                  0                  05/26/04   05/27/04    Murnane Building Contractors        
                                                            74                  0                  05/26/04   05/27/04    Murnane Building Contractors        
                                                            75                  0                  07/07/04   07/19/04    Murnane Building Contractors        
                                                            78                  0                  07/07/04   07/19/04    Murnane Building Contractors        
                                                            8                   0                  07/07/04   07/19/04    Bayview Elec.                       
                                                            8             -15,496                  12/07/04   12/10/04    K&L Plumbing                        
                                                            80                  0                  07/07/04   07/19/04    Murnane Building Contractors        
                                                            81                  0                  12/07/04   12/10/04    Murnane Building Contractors        
                                                            82                  0                  12/07/04   12/10/04    Murnane Building Contractors        
                                                            83                  0                  12/07/04   12/10/04    Murnane Building Contractors        
                                                            84                  0                  12/07/04   12/10/04    Murnane Building Contractors        
                                                            85             -9,747                  12/07/04   12/10/04    Murnane Building Contractors        
                                                            9                   0                  07/07/04   07/19/04    Bayview Elec.                       
 
13-1355   Reconstruction               0-001-005  04/22/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -9,537                  12/23/14   01/13/15    RSI Roofing, Inc.                   
 
13-1491   Reconstruction               0-001-006  09/12/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            P-CO.01         2,053                  11/04/15   11/27/15    L.H. LaPlante Company, Inc          
                                                            P-CO.02        13,379                  11/04/15   11/27/15    L.H. LaPlante Company, Inc.         
                                                            P-CO.03        17,516                  11/04/15   11/27/15    L.H. LaPlante Company, Inc.         
                                                            P-CO.04        -3,809                  11/04/15     /  /      L.H. LaPlante Company, Inc.         
 
15-1533   Reconstruction               0-001-007  04/15/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002             4,725                  11/21/16   11/28/16    Reale Construction Co., Inc.        
 
17-0459   Reconstruction               0-001-008  06/14/18  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1501FP Reconstruction               0-001-FP1  06/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE

KEENE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-06-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________
98-0522   Additions and Alterations    0-001-004  02/19/99  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1330   Reconstruction               0-001-006  08/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0426   Additions and Alterations    0-001-007  01/07/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            ADEC-03             0                  04/04/22   02/23/23    Dow Elec Inc                        
                                                            ADEC-04             0                  04/04/22   02/23/23    Dow Elec Inc                        
                                                            ADEC-05             0                  04/04/22   02/23/23    Dow Elec Inc                        
                                                            ADEC-06             0                  04/04/22   02/23/23    Dow Elec Inc                        
                                                            ADGC-03             0                  04/04/22     /  /      Hoosick Valley Contr                
                                                            ADMC-01         5,432                  04/04/22   02/23/23    K&L Plumb&Heat Inc                  
                                                            ADMC-03             0                  04/04/22   02/23/23    K&L Plumb&Heat Inc                  
                                                            ADMC-04             0                  04/04/22   02/23/23    K&L Plumb&Heat Inc                  
                                                            ADMC-05             0                  04/04/22   02/23/23    K&L Plumb&heat Inc                  
                                                            ADPC-01             0                  04/04/22   02/23/23    K&L Plumb&Heat Inc                  
                                                            ADPC-02             0                  04/04/22     /  /      K&L Plumb&Heat Inc                  
                                                            ADPC-03             0                  04/04/22     /  /      K&L Plumb&Heat Inc                  
                                                            ASMC-02             0                  04/04/22   02/23/23    K&L Plumb&Heat Inc                  
                                                            EC-01           6,930                  11/10/21   12/12/22    Dow Electric, Inc                   
                                                            EC-01 AA            0                  04/04/22   02/23/23    Dow Elec Inc                        
                                                            EC-02           2,791                  01/27/22   01/27/23    Dow Elec Inc                        
                                                            EC-02 AA            0                  04/04/22   03/06/23    Dow Elec Inc                        
                                                            EC-03           2,901                  09/16/22   10/31/23    Dow Elec Inc                        
                                                            EC-04           5,444                  09/16/22   10/31/23    Dow Elec Inc                        
                                                            EC-07               0                  09/16/22   10/31/23    Dow Elec Inc                        
                                                            EC-08               0                  09/16/22   10/31/23    Dow Elec Inc                        
                                                            EC-09               0                  09/16/22   10/31/23    Dow Elec Inc                        
                                                            FAPAC-01        8,881                  04/04/22   03/06/23    JCI/Simplex                         
                                                            GC-01          25,938                  11/10/21   12/01/22    Hoosick Valley Contractors          
                                                            GC-01           6,493                  11/10/21   12/01/22    Hoosick Valley Contractors          
                                                            GC-02          23,236                  11/10/21   12/01/22    Hoosick Valley Contractors          
                                                            GC-02          23,276                  11/10/21   12/01/22    Hoosick Valley Contractors          
                                                            GC-03          39,560                  11/10/21   02/23/23    Hoosick Valley Contractors          
                                                            GC-04               0                  04/04/22   02/23/23    Hoosick Valley Contr                
                                                            GC-04 AA            0                  04/04/22     /  /      Hoosick Valley Contr                
                                                            GC-05          21,574                  01/27/22   02/22/23    Hoosick Valley Contrs               
                                                            GC-05               0                  04/04/22   02/23/23    Hoosick Valley Contrs               
                                                            GC-06          20,209                  01/27/22   02/22/23    Hoosick Valley Contrs               
                                                            GC-07          13,130                  01/27/22   02/22/23    Hoosick Valley Contrs               
                                                            GC-08          -1,054                  05/27/22   01/30/23    Hoosick Valley Contrs               
                                                            GC-09            -517                  06/24/22   04/04/23    Hoosick Valley Contrs               
                                                            GC-10         -23,093                  09/16/22   10/31/23    Hoosick Valley Contrs               
                                                            MC-01          19,502                  01/27/22   01/27/23    K&L Plumb&heat Inc                  
                                                            MC-06               0                  06/24/22   04/27/23    K&L Plumb&Heat Inc                  
                                                            PC-01          10,395                  11/10/21   12/12/22    K&L Plumb&Heat LLC                  
                                                            PC-05               0                  06/24/22   04/27/23    K&L Plumb&Heat Inc                  
                                                            SC-01          53,304                  11/10/21   12/12/22    Reale Const, Inc                    
                                                            SC-01               0                  06/24/22   04/04/23    Reale Const Co Inc                  
 

          Temporary Classroom:
97-0038   New Construction             0-006-001  07/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
91-0605   Reconstruction               5-002-001  02/21/92  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1331   Reconstruction               5-002-002  08/20/09  NO CHANGE ORDERS ON ELECTRONIC FILE

MINERVA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-08-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Minerva Central School:
90-1409   Additions and Alterations    0-001-001  06/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1770   Reconstruction               0-001-002  07/26/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1414   Reconstruction               0-001-004  06/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0125   Reconstruction               0-001-005  11/08/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0736   Reconstruction               0-001-006  03/22/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0083   Reconstruction               0-001-007  01/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,950                  01/05/11   01/27/11    MOUNTAIN LAKE ELECTRICAL INC        
                                                            1              43,100                  01/05/11   01/27/11    BAST HATFIELD INC                   
                                                            1              17,502                  01/05/11   01/27/11    HMA CONTRACTING CORP                
                                                            2              25,939                  01/05/11   01/27/11    HMA CONTRACTING CORP                
                                                            2R             29,883                  01/05/11   01/27/11    MOUNTAIN LAKE ELECTRICAL INC        
                                                            3              45,637                  01/05/11   01/27/11    BAST HATFIELD INC                   
                                                            3              16,339                  01/05/11   01/27/11    HMA CONTRACTING CORP                
 
07-1938   Reconstruction               0-001-008  04/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1487   Reconstruction               0-001-009  05/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0157   Reconstruction               0-001-011  08/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0316FP Reconstruction               0-001-FP1  01/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
00-0327   Reconstruction               5-002-002  11/08/00  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0084   Reconstruction               5-002-003  01/12/09  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1488   Reconstruction               5-002-004  05/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE

MORIAH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-09-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
90-1312   Reconstruction               0-008-002  05/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0050   Reconstruction               0-008-003  07/24/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0141   Reconstruction               0-008-004  09/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0544   Reconstruction               0-008-005  12/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1523   Reconstruction               0-008-006  07/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0519   Reconstruction               0-008-007  07/20/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              15,264                  08/21/01   01/08/02    J&S Controls                        
                                                            5               3,865                  08/21/01   01/08/02    J&S Controls                        
                                                            6              11,850                  08/21/01   01/08/02    J&S Controls                        
                                                            7              17,451                  08/21/01   01/08/02    J&S Controls                        
                                                            8               1,208                  08/21/01   01/08/02    J&S Controls                        
                                                            9                 850                  03/28/02   04/29/02    J&S Controls                        
 
98-1327   Reconstruction               0-008-008  07/22/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,819                  03/10/00   03/10/00    Murnane Building Contractors, Inc   
                                                            1              20,771                  03/06/00   04/28/00    Brockway Mechanical Systems, Inc    
                                                            1               3,997                  11/02/99     /  /      Monahan & Loughan, Inc              
                                                            1               1,497                  03/22/00     /  /      J & S Controls                      
                                                            1              33,451                  06/28/01   06/21/01    Clear Air Technology                
                                                            1              20,440                  04/04/00     /  /      BMI Supply, Inc                     
                                                            1              -5,000                  04/28/00   04/28/00    Nickerson Corp                      
                                                            10                265                  12/28/00   12/28/00    Murnane Building Contactors, Inc    
                                                            10              4,224                  10/05/00     /  /      Hour Electric Co, Inc               
                                                            11                503                  12/01/00   01/30/01    Murnane Building Contractors, Inc   
                                                            11              1,027                  04/28/00   04/28/00    Hour Electric Co, Inc               
                                                            12              2,248                  03/23/01   03/23/01    Hour Electric Co, Inc               
                                                            13              1,557                  11/23/01   11/23/01    Hour Electric Co., Inc              
                                                            2              11,370                  03/28/00   03/28/00    Murnane Building Contractors, Inc   
                                                            2              12,787                  04/24/00     /  /      Brockway Mechanical Systems, Inc    
                                                            2              45,881                  11/02/99     /  /      Monahan & Loughlin, inc             
                                                            2              -1,430                  05/30/00     /  /      J & S Controls                      
                                                            2               4,062                  06/28/00   06/28/00    Clear Air technology                
                                                            2               4,950                  09/08/00   09/08/00    BMI Supply, Inc                     
                                                            3               4,548                  04/28/00   04/28/00    Murnane Building Contractors, inc   
                                                            3                 998                  06/05/00     /  /      Brockway Mechanical Systems, Inc    
                                                            3              16,357                  01/27/00     /  /      Monahan & Loughlin, Inc             
                                                            3                 398                  02/08/01     /  /      J & S Controls                      
                                                            3               9,400                  05/30/00     /  /      Clear Air Technology                
                                                            4               8,221                  09/12/07     /  /      Murnane Building Contractors, Inc   
                                                            4               5,376                  04/28/00   04/28/00    Monahan& Loughlin, Inc              
                                                            4              15,264                  01/04/01   01/04/01    J & S Controls                      
                                                            4                -700                  09/08/00   09/08/00    Clear Air Technology                
                                                            5               1,122                  05/02/00     /  /      Murnane Building Contractors, Inc   
                                                            5                -112                  05/30/00     /  /      Monahan & Loughlin, Inc             
                                                            5               3,865                  01/08/01   01/08/01    J & S Controls                      
                                                            5              17,218                  12/07/99     /  /      Clean Air Technology                
                                                            6               4,777                  05/30/00     /  /      Murnane Building Contractors, Inc   
                                                            6              11,850                  01/08/01   01/08/01    J & S Controls                      
                                                            7               7,057                  07/19/00     /  /      Murnane Building Contractors, Inc   
                                                            7              17,451                  01/08/01   01/08/01    J & S Controls                      
                                                            8               3,045                  12/28/00   12/28/00    Murnane Building Contractors, Inc   
                                                            8               1,208                  01/08/01   01/08/01    J & S Controls                      
                                                            9                 705                  12/28/00   12/28/00    Murnane Building Contractors, Inc   
                                                            9               2,266                  04/28/00   04/28/00    Hour Electric Co, Inc               
                                                            9                 850                  01/29/02     /  /      J & S Controls                      
 
99-0857   Reconstruction               0-008-009  05/25/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              13,536                  08/13/03   08/26/03    LH LaPlante                         
                                                            1              -4,897                  08/13/03   08/20/03    Nickerson                           
                                                            10             16,500                  04/17/02   05/30/02    USA Remediation Services            
                                                            10             17,800                  08/13/03   08/20/03    Luck Builders                       
                                                            11             11,019                  04/17/02   05/30/02    USA Remediation                     
                                                            11             19,700                  08/13/03   08/20/03    Luck Builders                       
                                                            12             -2,000                  12/18/01   06/23/03    USA Remediation                     
                                                            12              6,785                  01/17/02   06/23/03    Luck Builders                       
                                                            13              1,424                  03/22/02   05/06/02    Luck Builders                       
                                                            13               -850                  03/28/02   06/23/03    USA Remediation                     
                                                            2              -1,600                  01/18/01   01/10/02    USA Remediation                     
                                                            2               1,788                  01/25/02   04/01/02    Nickerson                           
                                                            2              11,376                  08/13/03   08/26/03    LH LaPlante                         
                                                            2              25,703                  08/13/03   08/26/03    Brockway Mech.                      
                                                            3              -5,000                  05/01/02   05/30/02    Nickerson                           
                                                            3              14,058                  08/13/03   08/26/03    LH LaPlante                         
                                                            3              17,618                  08/13/03   08/26/03    Brockway Mech.                      
                                                            4               9,032                  02/27/02   05/06/02    LH LaPlante                         
                                                            4               4,765                  08/13/03   08/26/03    Brockway Mech.                      
                                                            4              12,374                  08/13/03   08/20/03    USA Remediation                     
                                                            5               9,210                  12/19/01   07/09/03    Hour Elec.                          
                                                            5               2,422                  06/14/02   11/04/02    LH LaPlante                         
                                                            5              -2,422                  08/13/03   08/20/03    LH LaPlante                         
                                                            5              14,670                  08/13/03   08/26/03    Brockway Mech.                      
                                                            6              10,160                  03/28/02   06/23/03    Hour Elec.                          
                                                            6              13,469                  08/13/03   08/26/03    Brockway Mech.                      
                                                            7              11,072                  08/13/03   08/26/03    Luck Builders                       
                                                            7                -375                  08/13/03   08/26/03    Brockway Mech.                      
                                                            8               4,342                  11/21/02   01/07/03    Hour Elec.                          
                                                            8              22,982                  08/13/03   08/20/03    Luck Builders                       
                                                            8               5,307                  08/13/03   08/26/03    USA Remediation                     
                                                            9              18,000                  03/28/02   06/23/03    USA Remediation                     
 
01-0065   Additions and Alterations    0-008-010  03/14/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -58,128                  07/03/02   07/15/02    Murnane Building Contractors        
                                                            1              -5,860                  04/15/03   04/17/03    Brockway Mech.                      
                                                            1             -16,184                  04/15/03   04/17/03    Brockway Mech.                      
                                                            1             -12,876                  05/28/03   07/09/03    Bayview Elec.                       
                                                            1              -2,618                  11/03/03   11/12/03    AP Reale and Sons                   
                                                            1              -1,857                  10/29/04   11/24/04    LH LaPlante                         
                                                            2               1,638                  10/22/02   12/02/02    Murnane Building Contractors        
                                                            2              -1,000                  05/12/05   06/07/05    LH Plante Co                        
                                                            3               1,763                  03/04/03   06/25/03    Murnane Building Contractors        
                                                            4              -5,500                  04/15/03   04/17/03    Murnane Building Contractors        
                                                            5               1,113                  05/02/03   05/21/03    Murnane Building Contractors        
                                                            6                -594                  05/02/03   05/21/03    Murnane Building Contractors        
                                                            7             -10,000                  05/02/03   05/21/03    Murnane Building Contractors        
 
12-0745   Reconstruction               0-008-011  05/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          3,000                  02/26/15   03/18/15    Flex Electrical Constructors, Inc.  
                                                            EC-002        -21,300                  02/26/15   03/18/15    Flex Elextrical Constructors, Inc.  
                                                            MC-001         11,876                  02/26/15   03/18/15    L.H. LaPlante Company, Inc.         
                                                            MC-002         -2,300                  02/26/15   03/18/15    L.H. LaPlante Company, Inc.         
 
03-1610   Reconstruction               0-008-012  07/01/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1582   Reconstruction               0-008-013  01/15/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            AC-01           4,525                  09/25/08   01/26/09    OP-TECH ENVIRONMENTAL SERVICES, INC.
                                                            AC-02            -600                  01/09/08   01/27/09    OP-TECH ENVIRONMENTAL SERVICES, INC.
                                                            AC-03               0                  09/25/08     /  /      OP-TECH ENVIRONMENTAL SERVICES, INC.
                                                            AC-03               0                  01/09/09   01/21/09    OP-TECH ENVIRONMENTAL SERVICES, INC.
                                                            AC-04           4,759                  04/02/09   07/29/09    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            AC-05         -14,600                  08/17/09   09/02/09    OP-TECH ENVIRONMENTAL SERVICES,INC  
                                                            AC-06           8,711                  08/17/09   09/01/09    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            AC-07          29,000                  08/17/09   09/01/09    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            AC-08          22,110                  08/19/09   09/14/09    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            AC-09          24,740                  09/09/09   09/21/09    OP-TECH ENVIRONMENTAL SERVICES INC  
                                                            CNC-01         17,524                  11/07/08   04/13/09    CONTROL NETWORK COMMUNICATIONS, INC.
                                                            CNC-02         -2,022                  03/03/10     /  /      CONTROL NETWORK COMMUNICATIONS INC  
                                                            EC-001         23,750                  06/17/14   06/18/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-001         23,750                  06/05/14     /  /      Mountain Lake Electrical, Inc.      
                                                            EC-001         12,076                  06/05/14     /  /      Mountain Lake Electrical, Inc.      
                                                            EC-002         12,076                  06/17/14   06/18/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-003           -786                  06/17/14   06/18/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-003           -786                  06/05/14     /  /      Mountain Lake Electrical, Inc.      
                                                            EC-01        -134,323                  02/27/09   07/07/09    HOUR ELECTRIC CO., INC.             
                                                            EC-02            -268                  05/12/09   08/05/09    HOUR ELECTRIC CO., INC.             
                                                            EC-03         -31,000                  05/12/09   08/05/09    HOUR ELECTRIC CO., INC.             
                                                            EC-04         -89,000                  05/12/09   08/05/09    HOUR ELECTRIC CO., INC.             
                                                            EC-05            -550                  05/12/09   08/05/09    HOUR ELECTRIC CO., INC.             
                                                            EC-06             696                  06/08/09   09/23/09    HOUR ELECTRIC CO INC                
                                                            EC-07          19,682                  09/18/09   10/14/09    HOUR ELECTRIC CO INC                
                                                            EC-08         -52,483                  11/30/09   12/31/09    HOUR ELECTRIC CO INC                
                                                            EC-09          26,109                  11/30/09   01/08/10    HOUR ELECTRIC CO INC                
                                                            EC-10           4,952                  11/30/09   12/31/09    HOUR ELECTRIC CO INC                
                                                            FTC-01         -2,473                  11/18/08   04/03/09    ENVIRONMENTAL & FUELING SYSTEMS, LLC
                                                            GC-001         71,589                  06/17/14   06/18/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-001         71,589                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-002         -6,006                  06/17/14   06/18/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-002         -6,006                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-003         16,120                  06/17/14   06/18/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-003         16,120                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-004              0                  06/17/14   06/18/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-004              0                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-005         -2,150                  06/17/14   06/18/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-005         -2,150                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-006         -6,815                  06/17/14   06/18/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-006         -6,185                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-007           -537                  06/17/14   06/18/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-007           -537                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-008         -7,851                  06/17/14   06/18/14    RICNICK CONSTRUCTION CORP           
                                                            GC-008          7,851                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-01          24,639                  02/27/09   05/28/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-02          10,937                  06/15/09   08/11/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-03          11,500                  06/15/09   08/11/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-04         -30,000                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-05          -4,000                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-06         -17,000                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-07         -38,000                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-08         -10,700                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-09         -29,000                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-10         -13,953                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-11           6,081                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-12           3,782                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-13          -5,539                  06/15/09   08/05/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-14           5,866                  06/24/09   08/13/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-15           2,538                  06/24/09   08/13/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-16           4,451                  07/03/09   08/18/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-17           6,900                  07/03/09   08/18/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-18           8,172                  07/03/09   09/01/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-19           7,004                  07/03/09   09/01/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-20           4,377                  07/03/09   08/18/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-21          10,799                  07/17/09   08/18/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-22           1,036                  07/22/09   08/24/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-23           2,973                  08/19/09   09/04/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-24           1,982                  08/19/09   09/04/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-25              78                  08/19/09   09/14/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-26           2,980                  09/01/09   09/17/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-27           4,005                  10/02/09   11/09/09    MURNANE BUILDING CONTRACTORS        
                                                            GC-28           1,842                  09/29/09   11/13/09    MURNANE BUILDING CONTRACTORS        
                                                            HVAC-01        18,650                  05/15/09   10/07/09    LH LAPLANTE CO INC                  
                                                            HVAC-02       -14,124                  05/15/09   01/08/10    LH LAPLANTE CO INC                  
                                                            HVAC-03          -530                  05/15/09   01/08/10    LH LAPLANTE CO INC                  
                                                            HVAC-04         1,977                  05/27/09   09/22/09    L.H. LAPLANTE CO INC                
                                                            HVAC-05         6,802                  06/03/09   01/08/10    LH LAPLANTE CO INC                  
                                                            HVAC-06        10,983                  11/16/09   03/12/10    L.H. LAPLANTE CO INC                
                                                            PC-001        -12,000                  06/17/14   06/18/14    ACKERMAN PLUMBIN INC                
                                                            PC-001        -12,000                  06/05/14     /  /      Ackerman Plumbing, Inc.             
                                                            PC-002        -15,040                  06/17/14   06/18/14    ACKERMAN PLUMBING INC               
                                                            PC-002        -15,040                  06/05/14     /  /      Ackerman Plumbing, Inc.             
                                                            PC-003         16,165                  06/17/14   06/18/14    ACKERMAN PLUMBING INC               
                                                            PC-003         16,165                  06/05/14     /  /      Ackerman Plumbing, Inc.             
                                                            PC-004           -597                  06/17/14   06/18/14    ACKERMAN PLUMBING INC               
                                                            PC-004           -597                  06/05/14     /  /      Ackerman Plumbing, Inc.             
                                                            PC-01           2,780                  05/15/09   01/08/10    LH LAPLANTE CO INC                  
                                                            PC-02         -28,905                  11/16/09   01/04/10    L.H. LAPLANTE CO INC                
 
10-0697   Reconstruction               0-008-014  07/14/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-001         17,850                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-001         17,850                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-002         12,165                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-002         12,165                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-003          1,450                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-003          1,450                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-004          7,554                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INCL       
                                                            EC-004          7,554                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-005          2,992                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-005          2,992                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-006          7,278                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-006          7,278                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-007         10,612                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-007         10,612                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-008          3,801                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-008          3,801                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-009           -563                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-009           -563                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            EC-010          2,612                  06/12/14   06/13/14    MOUNTAIN LAKE ELECTRICAL INC        
                                                            EC-010          2,612                  06/05/14   07/02/14    Mountain Lake Electrical, Inc.      
                                                            GC-001          8,635                  06/12/14   06/13/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-001          8,635                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-002          3,436                  06/12/14   06/13/14    RIZNICK CONSTRUCTION CORP           
                                                            GC-002          3,464                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-003          6,778                  06/12/14   06/13/14    REZNICK CONSTRUCTION CORP           
                                                            GC-003          6,778                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-004          7,338                  06/12/14   06/13/14    REZNICK CONSTRUCTION CORP           
                                                            GC-004          7,338                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-005         13,762                  06/12/14   06/13/14    REZNICK CONSTRUCTION CORP           
                                                            GC-005         13,762                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-006          2,997                  06/12/14   06/13/14    REZNICK CONSTRUCTION CORP           
                                                            GC-006          2,997                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-007          7,713                  06/12/14   06/13/14    REZNICK CONSTRUCTION CORP           
                                                            GC-007          7,713                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-008          3,367                  06/12/14   06/13/14    REZNICK CONSTRUCTION CORP           
                                                            GC-008          3,367                  06/05/14     /  /      Riznick Construction Corp           
                                                            GC-009           -107                  06/12/14   06/13/14    REZNICK CONSTRUCTION CORP           
                                                            GC-009           -107                  06/05/14     /  /      Riznick Construction Corp           
                                                            MC-001         18,118                  06/12/14   06/13/14    BROCKWAY MECHANICAL SYSTEMS INC     
                                                            MC-001         18,118                  06/05/14     /  /      Brockway Mechanical Systems, Inc.   
                                                            MC-001         18,118                  06/05/14   07/03/14    Brockway Mechanical Systems, Inc.   
                                                            MC-002          8,099                  06/12/14   06/13/14    BROCKWAY MECHANICAL SYSTEMS INC     
                                                            MC-002          8,099                  06/05/14   07/03/14    Brockway Mechanical Systems, Inc.   
                                                            MC-003          7,276                  06/12/14   06/13/14    BROCKWAY MECHANICAL SYSTEMS INC     
                                                            MC-003          7,276                  06/05/14   07/03/14    Brockway Mechanical Systems, Inc.   
                                                            MC-004          1,348                  06/12/14   06/13/14    BROCKWAY MECHANICAL SYSTEMS INC     
                                                            MC-004          1,348                  06/05/14   07/03/14    Brockway Mechanical Systems, Inc.   
                                                            MC-005         10,368                  06/12/14   06/13/14    BROCKWAY MECHANICAL SYSTEMS INC     
                                                            MC-005         10,368                  06/05/14   07/03/14    Brockway Mechanical Systems, Inc.   
                                                            PC-001          3,772                  06/12/14   06/13/14    ACKERMAN PLUMBING INC               
                                                            PC-001          3,772                  06/05/14   07/02/14    Ackerman Plumbing, Inc.             
                                                            PC-002         13,513                  06/12/14   06/13/14    ACKERMAN PLUMBING INC               
                                                            PC-002         13,513                  06/05/14   07/02/14    Ackerman Plumbing, Inc.             
                                                            PC-003         10,954                  06/12/14   06/13/14    ACKERMAN PLUMBING INC               
                                                            PC-003         10,954                  06/05/14   07/02/14    Ackerman Plumbing, Inc.             
                                                            PC-004            494                  06/12/14   06/13/14    ACKERMAN PLUMBING INC               
                                                            PC-004            494                  06/05/14   07/02/14    Ackerman Plumbing, Inc.             
                                                            PC-005          4,402                  06/12/14   06/13/14    ACKERMAN PLUMBING INC               
                                                            PC-005          4,402                  06/05/14   07/02/14    Ackerman Plumbing, Inc.             
                                                            PC-006            803                  06/12/14   06/13/14    ACKERMAN PLUMBING INC               
                                                            PC-006            803                  07/02/14   07/02/14    Ackerman Plumbing, Inc.             
 
10-0906   Reconstruction               0-008-015  03/22/11  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1035   Additions and Alterations    0-008-016  05/10/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
98-1328   Reconstruction               5-007-002  07/22/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0858   Reconstruction               5-007-003  05/25/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            7               2,000                  11/21/02   01/07/03    Hour Elec.                          
                                                            8               4,904                  01/09/02   07/09/03    Brockway Mech.                      
 
12-0746   Reconstruction               5-007-005  05/15/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002        -21,300                  02/26/15   03/23/15    Flex Electrical Constructors, Inc.  
                                                            MC-002         -2,300                  02/26/15   03/23/15    L.H. LaPante Company, Inc.          
                                                            RC-001          9,423                  02/26/15   03/23/15    Mid State Industries Ltd.           
                                                            RC-002         -5,500                  02/26/15   03/23/15    Mid State Industries Ltd.           
 
20-1036   Additions and Alterations    5-007-006  05/10/21  NO CHANGE ORDERS ON ELECTRONIC FILE

NEWCOMB CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-10-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
93-0047   Reconstruction               0-001-004  08/02/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0751   Reconstruction               0-001-005  04/15/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0186   Additions and Alterations    0-001-006  12/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            36,900                  02/10/06   03/02/06    Bette Cring                         
                                                            001             4,960                  02/10/06   05/25/06    s and L electric                    
                                                            002            64,400                  02/10/06   05/25/06    Bette Cring                         
                                                            003            22,973                  02/10/06   05/25/06    Bette Cring                         
                                                            004            11,153                  02/17/06   07/21/06    Bette Cring                         
 
02-2152   Reconstruction               0-001-007  05/28/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -1,215                  12/06/04   12/10/04    Quaker Bay                          
                                                            02             -4,000                  12/06/04   12/10/04    Quaker Bay                          
 
04-0786   Reconstruction               0-001-009  02/15/06  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0785   Reconstruction               0-001-010  03/18/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  06/28/06     /  /      Rozell East, Inc.                   
 
07-0005   Reconstruction               0-001-012  07/16/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,000                  12/20/07   01/07/08    Sunshine Environmental Services,INC 
                                                            1              -5,000                  05/06/08   08/12/08    GROSS ELECTRIC, INC.                
 
12-0642   Reconstruction               0-001-013  05/10/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-001        -7,306                  10/19/15   11/19/15    K&L Plumbing & Heating, Inc.        
                                                            01-001          2,808                  08/26/14   09/03/14    Hoosick Valley Contractors, Inc.    
                                                            01-002            873                  09/26/14   10/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-003            650                  09/26/14   10/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-004            396                  09/26/14   10/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-005            309                  09/26/14   10/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-006            332                  09/26/14   10/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-007          1,858                  09/26/14   10/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-008          2,192                  09/26/14   10/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-009            967                  10/23/14   10/24/14    Hoosick Valley Contractors, Inc.    
                                                            01-010            281                  10/23/14   10/24/14    Hoosick Valley Contractors, Inc.    
                                                            01-011          2,982                  10/23/14   10/24/14    Hoosick Valley Contractors, Inc.    
                                                            01-012          1,642                  10/23/14   10/24/14    Hoosick Valley Contractors, Inc.    
                                                            01-013          3,921                  10/23/14   10/24/14    Hoosick Valley Contractors, Inc.    
                                                            01-014          2,808                  10/23/14   10/24/14    Hoosick Valley Contractors, Inc.    
                                                            01-015         11,846                  10/28/14   11/12/14    Hoosick Valley Contractors, Inc.    
                                                            01-016           -610                  11/28/14   12/08/14    Hoosick Valley Contractors, Inc.    
                                                            01-017          3,094                  02/05/15   02/06/15    Hoosick Valley Contractors, Inc.    
                                                            01-018         -1,490                  08/18/15   08/21/15    Hoosick Valley Contractors Inc.     
                                                            03-001          7,200                  09/03/14   09/08/14    Mountain Lake Electrical            
                                                            03-002          4,800                  11/04/14   11/12/14    Mountain Lake Electric              
                                                            03-003         21,910                  05/29/15   06/11/15    Mountain Lake Electrical            
                                                            03-004          4,639                  05/29/15   06/11/15    Mountain Lake Electrical            
                                                            03-005           -733                  08/18/15   08/21/15    Mountain Lake Electrical            
                                                            04-001         -3,893                  02/09/15   02/11/15    Brockway Mechanical Sytems, Inc.    
 
19-0984   Additions and Alterations    0-001-014  05/04/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001                 0                  09/16/22   11/13/23    Hoosick Valley Falls                
                                                            001            59,295                  09/16/22     /  /      Stants Capital Combustion           
                                                            002              -586                  09/16/22   10/31/23    Hoosick Valley Contrs Inc           
                                                            003             2,360                  09/16/22   11/13/23    Hoosick Valley Contr Inc            
                                                            004             6,930                  09/16/22   11/13/23    Hoosick Valley Contrs Inc           
                                                            01-005        -16,104                  11/17/22   09/07/23    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-006          5,409                  11/17/22   09/07/23    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-007         -1,136                  11/17/22   09/07/23    HOOSICK VALLEY CONTRACTORS INC      
                                                            01-008         12,480                  11/17/22   09/18/23    HOOSICK VALLEY CONTRACTORS INC      
                                                            04-001          1,979                  11/17/22   09/19/23    WATSON ELECTRIC INC                 
                                                            CO-002         17,394                  03/16/23   12/19/23    STANTS CAPITAL COMBUSTION,LLC       
                                                            CO-002          1,274                  07/03/23   12/29/23    WATSON ELECTRIC                     
 
07-0895SC Visual Structural Inspection 0-001-SC1  12/06/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
03-0451   Reconstruction               5-002-002  10/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -4,096                  08/14/06   08/16/06    Burly Construction                  
                                                            01               -481                  07/26/06   10/19/06    Gross electric                      
                                                            01               -481                  10/05/07   10/05/07    Gross Electric, Inc                 
                                                            02               -100                  08/10/06   10/19/06    Gross Electric                      
                                                            02                100                  10/05/07   10/05/07    Gross Electric, Inc                 
 

LAKE PLACID CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-11-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
94-1102   Reconstruction               0-001-005  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0385   Reconstruction               0-001-006  10/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1646   Additions and Alterations    0-001-007  08/01/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,500                  11/21/02   01/02/03    Monahan & Loughlin                  
                                                            1               6,618                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            1              -2,359                  06/29/04   06/25/08    Watson Electric                     
                                                            1             -24,755                  06/29/04   09/09/04    Monahan & Loughlin                  
                                                            1              -9,987                  06/29/04   09/09/04    Jefford Steel Specialty             
                                                            1              -2,749                  06/29/04   09/09/04    Annese Associates                   
                                                            1               1,500                  06/29/04   06/25/08    Abscope Environmental               
                                                            1                -232                  06/30/04   11/03/04    K&L Plumbing                        
                                                            1              -1,361                  06/30/04   06/25/08    Northern Mechanical                 
                                                            10             -1,478                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            10             -1,672                  06/30/04   06/25/08    Watson Electric                     
                                                            10               -570                  06/30/04   06/25/08    Northern Mechanical                 
                                                            11              1,328                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            11              4,513                  06/29/04   06/25/08    Watson Electric                     
                                                            11               -300                  06/30/04   06/25/08    Northern Mechanical                 
                                                            12            -10,007                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            12                343                  06/30/04   06/25/08    Northern Mechanical                 
                                                            13              6,632                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            13              2,017                  06/30/04   06/25/08    Northern Mechanical                 
                                                            14              2,178                  06/14/04   06/25/08    Murnane Building Contractors        
                                                            14              2,883                  06/30/04   07/21/04    Northern Mechanical                 
                                                            15            -12,573                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            16              2,068                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            16             13,548                  06/29/04   06/25/08    Murnane Building Contractors        
                                                            17            -16,302                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            18              2,647                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            19              1,292                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            2                -415                  12/18/03   12/29/03    K&L Plumbing                        
                                                            2              -1,682                  06/10/04   06/25/08    Monahan & Loughlin                  
                                                            2              -1,623                  06/29/04   06/25/08    Watson Electric                     
                                                            2              -6,435                  06/29/04   06/25/08    Jeffords Steel Specialty            
                                                            2               4,900                  06/29/04   06/25/08    Abscope Environmental               
                                                            2                -300                  06/30/04   11/03/04    K&L Plumbing                        
                                                            20              6,113                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            21             -3,999                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            22              3,005                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            23              5,827                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            24              1,748                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            25              3,783                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            26              4,444                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            27             13,117                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            28             19,920                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            29              4,575                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            3             -23,512                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            3              -3,019                  06/10/04   06/25/08    Monahan & Loughlin                  
                                                            3              -3,000                  06/29/04   06/25/08    Watson Electric                     
                                                            3              -1,371                  06/29/04   06/25/08    Jefford Steel Specialty             
                                                            3               3,900                  06/29/04   06/25/08    Abscope Environmental               
                                                            3               1,994                  06/30/04   06/25/08    K&L Plumbing                        
                                                            3              15,305                  06/30/04   06/25/08    Northern Mechanical                 
                                                            30              1,987                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            31              3,807                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            32              4,128                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            34                507                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            35                293                  06/10/04   06/25/08    Murnane Building Contractors        
                                                            37              5,700                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            38              7,378                  06/09/04   06/25/08    Murnane Building Contractors        
                                                            39              1,298               3  06/09/04   06/25/08    Murnane Building Contractors        
                                                            4                -214                  06/29/04   06/25/08    Watson Electric                     
                                                            4              60,857                  06/29/04   06/26/08    Murnane Building Contractors        
                                                            4                 800                  06/29/04   06/25/08    Abscope Environmental               
                                                            4               1,595                  06/30/04   06/25/08    K&L Plumbing                        
                                                            4               6,191                  06/30/04   06/25/08    Northern Mechanical                 
                                                            5              16,568                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            5              -3,120                  06/29/04   06/25/08    Watson Electric                     
                                                            5              19,319                  06/29/04   06/25/08    Jeffords Steel Specialty            
                                                            5                 800                  06/29/04   06/25/08    Abscope Environmental               
                                                            5                 609                  06/30/04   06/25/08    K&L Plumbing                        
                                                            5                   0                  06/30/04   06/25/08    Northern Mechanical                 
                                                            6             -15,080                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            6              -5,889                  06/29/04   06/25/08    Watson Electric                     
                                                            6                 800                  06/29/04   06/25/08    Abscope Environmental               
                                                            6               1,161                  06/30/04   06/25/08    K&L Plumbing                        
                                                            6               6,748                  06/30/04   06/25/08    Northern Mechanical                 
                                                            7              60,360                  06/09/04   06/26/08    Murnane Building Contractors        
                                                            7               1,872                  06/29/04   06/25/08    Watson Electric                     
                                                            7             -21,156                  06/29/04   06/20/05    Northern Mechanical                 
                                                            7               4,950                  06/29/04   06/25/08    Abscope Environmental               
                                                            8              86,424                  06/09/04   06/30/08    Murnane Building Contractors        
                                                            8                 630                  06/29/04   06/25/08    Watson Electric                     
                                                            8               3,600                  06/29/04   06/25/08    Abscope Environmental               
                                                            8               4,737                  06/30/04   06/25/08    Northern Mechanical                 
                                                            9             -12,507                  06/08/04   06/25/08    Murnane Building Contractors        
                                                            9               8,516                  06/29/04   06/25/08    Watson Electric                     
                                                            9               7,681                  06/30/04   06/25/08    Northern Mechanical                 
 
00-1811   Additions and Alterations    0-001-008  06/06/01  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1417   Reconstruction               0-001-009  05/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03          14,577                  10/21/09   12/15/09    WILLIAM J. MURRAY INC               
                                                            GC-01         244,736                  10/01/07   11/08/07    STEVEN E. FULLER EXCAVATING, INC.   
                                                            GC-01R       -244,736                  10/01/07   11/13/07    STEVEN E. FULLER EXCAVATING, INC.   
 
11-0094   Reconstruction               0-001-010  08/12/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-01          -2,200                  07/17/12   11/28/12    INTERNATIONAL CHIMNEY CORPORATION   
 
12-1134   Reconstruction               0-001-011  11/20/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2052   Additions and Alterations    0-001-012  03/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          53,464                  09/14/20   11/05/20    DOW ELECTRIC, INC.                  
                                                            EC-02          12,132                  10/21/20   12/30/20    DOW ELECTRIC, INC.                  
                                                            GC-01          33,360                  08/14/19   08/15/19    MID-STATE INDUSTRIES,LTD            
                                                            GC-01         139,763                  09/05/19   09/26/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-02          22,237                  08/30/19   09/27/19    MID-STATE INDUSTRIES, LTD.          
                                                            GC-02          31,838                  10/29/19   10/30/19    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-03          32,333                  10/11/19   10/21/19    MID-STATE INDUSTRIES, LTD.          
                                                            GC-03          28,070                  11/05/19   11/08/19    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-04           5,862                  11/01/19   11/05/19    MID-STATE INDUSTRIES, LTD.          
                                                            GC-04           4,445                  02/07/20   03/13/20    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-05          10,878                  02/07/20   03/13/20    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-06           6,883                  02/07/20   03/13/20    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-06           1,321                  06/12/20   08/07/20    Mid-States Industries               
                                                            GC-07           4,664                  02/07/20   03/13/20    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-07           1,572                  06/12/20   08/07/20    Mid-State Industries                
                                                            GC-08          18,589                  02/07/20   03/13/20    BAST HATFIELD CONSTRUCTION LLC      
                                                            GC-09          14,256                  02/19/20   06/04/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-09          14,256                  06/12/20   08/07/20    Bast Hatfield                       
                                                            GC-10           8,542                  06/12/20   08/07/20    Bast Hatfield                       
                                                            GC-11          18,230                  06/12/20   08/07/20    Bast Hatfield                       
                                                            GC-12          12,903                  07/17/20   09/08/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-13         168,324                  08/03/20   10/02/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-14          29,266                  09/17/20   11/17/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-15           5,959                  09/17/20   11/17/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-16          34,864                  10/21/20   12/30/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-17          31,120                  10/27/20   01/08/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-18          12,091                  10/30/20   01/11/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-19           5,655                  11/17/20   02/10/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-20           4,407                  11/17/20   02/11/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-23           5,728                  01/08/21   03/16/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-24           2,866                  01/08/21   03/16/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-25          47,935                  11/17/20   02/11/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-26          29,001                  11/17/20   02/11/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-27          10,601                  11/17/20   02/11/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-28          12,465                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-29          18,129                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-30          85,053                  02/08/21   03/19/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-31          32,644                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-32           4,274                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-33           4,119                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-34           1,195                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-35           1,265                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-36           2,462                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-38            -992                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            MC-01          58,738                  09/20/21   12/01/22    DiGesare Mech, Inc                  
                                                            PC-03          22,001                  11/17/20   02/11/21    PIPELINE MECHANICAL PF PLATTSBURGH  
                                                            PC-05             917                  02/08/21   03/31/21    PIPELINE MECHANICAL OF PLATTSBURGH  
                                                            RC-01           8,909                  06/10/21   03/15/22    Elmer W. Davis Inc                  
                                                            SC-02          65,910                  12/22/20   03/12/21    LUCK BROTHERS, INC.                 
                                                            SC-03         -52,207                  12/22/20   03/12/21    LUCK BROTHERS, INC.                 
                                                            SC-05           4,190                  09/20/21   12/01/22    Luck Brothers, Inc                  
 
18-0361   Reconstruction               0-001-013  09/07/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lake Placid Elementary:
92-0126   Reconstruction               0-007-004  08/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1301   Additions and Alterations    0-007-005  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0500   Additions and Alterations    0-007-006  03/08/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                  59                  06/10/03   06/25/03    LH LaPlante                         
                                                            1              -1,309                  06/10/03   06/25/03    Brockway Mech.                      
                                                            1              -1,094                  06/10/03   06/25/03    Watson Electric                     
                                                            1              -8,219                  06/10/03   06/25/03    Luck Builders                       
                                                            10              1,523                  06/10/03   06/25/03    Luck Builders                       
                                                            11             -1,209                  06/10/03   06/25/03    Luck Builders                       
                                                            12                590                  06/10/03   06/25/03    Luck Builders                       
                                                            13              2,171                  06/10/03   06/25/03    Luck Builders                       
                                                            14               -146                  06/10/03   06/25/03    Luck Builders                       
                                                            17             -2,109                  06/10/03   06/25/03    Luck Builders                       
                                                            18                207                  06/10/03   06/25/03    Luck Builders                       
                                                            19             -9,800                  06/10/03   06/25/03    Luck Builders                       
                                                            2              -1,260                  06/10/03   06/25/03    Watson Electric                     
                                                            2              -1,534                  06/10/03   06/25/03    Luck Builders                       
                                                            20              1,894                  06/10/03   06/25/03    Luck Builders                       
                                                            3               3,686                  06/10/03   06/25/03    Luck Builders                       
                                                            3              -5,239                  06/25/03   06/25/03    Watson Electric                     
                                                            4                 384                  06/10/03   06/25/03    Luck Builders                       
                                                            5               1,960                  06/10/03   06/25/03    Luck Builders                       
                                                            6               6,039                  06/10/03   06/25/03    Luck Builders                       
                                                            7                 515                  06/10/03   06/25/03    Luck Builders                       
                                                            8               6,332                  06/10/03   06/25/03    Luck Builders                       
 
06-1418   Reconstruction               0-007-007  05/23/07  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1135   Reconstruction               0-007-008  11/20/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-2053   Additions and Alterations    0-007-009  03/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-21           5,006                  11/17/20   02/11/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-37           1,468                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-39               0                  02/08/21   03/23/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            MC-02           1,073                  09/20/21   12/01/22    DiGesare Mech, Inc                  
                                                            PC-01           2,246                  01/14/20   02/03/20    PIPELINE MECHANICAL OF PLATTSBURGH  
                                                            PC-02          12,090                  11/17/20   02/11/21    PIPELINE MECHANICAL OF PLATTSBURGH  
                                                            SC-01          33,331                  08/26/20   11/03/20    LUCK BROTHERS, INC.                 
 

          Annex Building - Jr./Sr. High School:
93-1003   Reconstruction               1-008-002  05/06/94  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1136   Reconstruction               1-008-004  11/20/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Oval Support Building (New):
20-0857   New Construction             2-012-001  03/29/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Restrooms-AthleticFields@HorseShowGr:
06-1419   Additions and Alterations    7-009-002  05/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02          15,856                  12/23/08   05/08/09    WILLIAM J. MURRAY, INC.             
                                                            GC-02           9,983                  08/07/09   09/25/09    STEVEN E. FULLER EXCAVATING, INC.   
                                                            GC-03           2,796                  08/07/09     /  /      STEVEN E FULLER EXCAVATING INC      
                                                            GC-04REV        8,688                  08/07/09   09/25/09    STEVEN E FULLER EXCAVATING INC      
                                                            GC-05REV        6,317                  08/07/09     /  /      STEVEN E FULLER EXCAVATING INC      
                                                            GC-06REV       15,035                  08/07/09   10/23/09    STEVEN E FULLER EXCAVATING INC      
                                                            PC-01          -1,558                  08/14/08   10/31/08    JOHN V. WARREN                      
 
17-2054   Reconstruction               7-009-003  03/14/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-04               0                  12/22/20   03/12/21    LUCK BROTHERS, INC.                 
 

SCHROON LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-14-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Central School:
03-1612   Reconstruction               0-001-005  06/14/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -49,915                  08/25/04   09/16/04    TP Monahan                          
                                                            1-02            8,838                  11/01/04   11/05/04    TP Monahan                          
                                                            2-01            1,397                  11/10/04   12/06/04    K&L Plumbing                        
 
08-0321   Additions and Alterations    0-001-006  03/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01                0                  10/23/09   11/25/09    BAST HATFIELD INC                   
                                                            1-02           66,556                  09/08/09   02/12/10    BAST HATFIELD, INC.                 
                                                            1-03           14,102                  09/16/09   10/07/09    BAST HATFIELD INC                   
                                                            1-036          15,723                  03/08/11   03/30/11    BAST HATFIELD INC                   
                                                            1-037          16,287                  03/08/11   03/30/11    BAST HATFIELD INC                   
                                                            1-038           8,918                  03/08/11   03/30/11    BAST HATFIELD INC                   
                                                            1-039          30,924                  03/08/11   03/30/11    BAST HATFIELD INC                   
                                                            1-04          164,725                  09/29/09   11/03/09    BAST HATFIELD INC                   
                                                            1-040          14,785                  05/27/11   07/15/11    BAST HATFIELD INC                   
                                                            1-041           9,516                  05/27/11   07/15/11    BAST HATFIELD INC                   
                                                            1-042          14,763                  05/27/11   07/15/11    BAST HATFIELD INC                   
                                                            1-043           4,022                  06/13/11   07/15/11    BAST HATFIELD INC                   
                                                            1-044          14,520                  06/13/11   07/15/11    BAST HATFIELD INC                   
                                                            1-045          43,537                  06/20/11   07/15/11    BAST HATFIELD INC                   
                                                            1-046           2,049                  08/10/11   09/07/11    BAST HATFIELD INC                   
                                                            1-048           7,432                  11/16/11   01/25/12    BAST HATFIELD INC                   
                                                            1-05           11,599                  10/06/09   11/03/09    BAST HATFIELD INC                   
                                                            1-06            5,196                  12/08/09   01/15/10    BAST HATFIELD INC                   
                                                            1-07           11,392                  12/08/09   01/15/10    BAST HATFIELD INC                   
                                                            1-08          164,238                  12/08/09   01/15/10    BAST HATFIELD INC                   
                                                            1-09           27,561                  12/08/09   01/15/10    Bast Hatfield Inc                   
                                                            1-10           53,121                  12/08/09   01/15/10    BAST HATFIELD INC                   
                                                            1-11           79,772                  04/05/10   06/16/10    BAST HATFIELD INC                   
                                                            1-12           37,680                  06/10/10   08/26/10    BAST HATFIELD INC                   
                                                            1-13            8,794                  06/10/10   08/26/10    BAST HATFIELD INC                   
                                                            1-14           40,962                  06/10/10   08/26/10    BAST HATFIELD INC                   
                                                            1-15           20,805                  08/26/10   08/26/10    BAST HATFIELD INC                   
                                                            1-16           15,768                  06/10/10   08/26/10    BAST HATFIELD INC                   
                                                            1-17                0                  07/06/10   08/20/10    BAST HATFIELD INC                   
                                                            1-18           13,669                  08/20/10   09/13/10    BAST HATFIELD INC                   
                                                            1-19           49,673                  08/20/10   09/13/10    BAST HATFIELD INC                   
                                                            1-20           23,439                  08/20/10   09/13/10    BAST HATFIELD INC                   
                                                            1-21           15,542                  08/20/10   09/13/10    BAST HATFIELD INC                   
                                                            1-22           37,452                  09/10/10   09/28/10    BAST HATFIELD INC                   
                                                            1-23           34,637                  09/10/10   09/28/10    BAST HATFIELD INC                   
                                                            1-24           12,689                  09/10/10   09/28/10    BAST HATFIELD INC                   
                                                            1-25          -39,488                  09/10/10   09/28/10    BAST HATFIELD INC                   
                                                            1-26            1,542                  11/04/10   11/10/10    BAST HATFIELD INC                   
                                                            1-27           11,562                  11/04/10   11/10/10    BAST HATFIELD INC                   
                                                            1-28           13,860                  11/04/10   11/10/10    BAST HATFIELD INC                   
                                                            1-29            8,082                  11/04/10   11/10/10    BAST HATFIELD INC                   
                                                            1-30           15,000                  11/04/10   11/10/10    BAST HATFIELD INC                   
                                                            1-31            3,983                  11/09/10   11/12/10    BAST HATFIELD INC                   
                                                            1-32           50,875                  01/12/11   02/16/11    BAST HATFIELD INC                   
                                                            1-33            5,467                  01/12/11   02/16/11    BAST HATFIELD INC                   
                                                            1-34            8,176                  01/12/11   02/16/11    BAST HATFIELD INC                   
                                                            1-35           31,103                  01/31/11   02/23/11    BAST HATFIELD INC                   
                                                            2-01           26,105                  12/15/09   01/15/10    ROZELL EAST INC                     
                                                            2-01                0                  01/12/10   02/19/10    ROZELL EAST INC                     
                                                            2-02                0                  01/12/10   02/19/10    ROZELL EAST INC                     
                                                            2-03          -26,307                  11/14/11   05/08/12    ROZELL EAST INC                     
                                                            2-04            1,060                  02/09/12   01/25/13    ROZELL EAST INC                     
                                                            3-01            8,475                  02/08/10   03/19/10    DIGESARE MECHANICAL INC             
                                                            3-02           16,994                  04/13/10   05/28/10    DIGESARE MECHANICAL INC             
                                                            3-04           17,028                  09/10/10   09/28/10    DIGESARE MECHANICAL INC             
                                                            3-05            2,938                  02/24/11   03/18/11    DIGESARE MECHANICAL INC             
                                                            3-06            4,793                  01/25/11   02/23/11    DIGESARE MECHANICAL INC             
                                                            3-07            1,346                  04/25/11   05/20/11    DIGESARE MECHANICAL INC             
                                                            3-08              785                  05/27/11   07/15/11    DIGESARE MECHANICAL INC             
                                                            3-09              286                  08/10/11   09/30/11    DIGESARE MECHANICAL INC             
                                                            4-01            5,177                  12/15/09   02/05/10    HAROLD R. CLUNE INC                 
                                                            4-02           40,625                  04/14/10   05/28/10    HAROLD R. CLUNE INC                 
                                                            4-03                0                  07/27/10   09/03/10    HAROLD R CLUNE INC                  
                                                            4-04            5,409                  02/24/11   03/18/11    HAROLD R CLUNE INC                  
                                                            4-05           37,510                  01/05/11   02/22/11    HAROLD R CLUNE INC                  
                                                            4-06            5,542                  01/05/11   02/22/11    HAROLD R CLUNE INC                  
                                                            4-07           46,018                  01/05/11   02/22/11    HAROLD R CLUNE INC                  
                                                            4-08            6,221                  01/31/11   02/23/11    HAROLD R CLUNE INC                  
                                                            4-09           16,647                  05/27/11   07/15/11    HAROLD R CLUNE INC                  
                                                            4-10            4,602                  06/08/11   07/15/11    HAROLD R CLUNE INC                  
                                                            4-11R           6,370                  06/15/11   07/15/11    HAROLD R CLUNE INC                  
                                                            4-12           20,045                  07/21/11   04/23/12    HAROLD R CLUNE INC                  
                                                            4-13           13,231                  09/12/11   10/25/11    HAROLD R CLUNE INC                  
                                                            4-15            9,471                  10/18/11   04/16/12    HAROLD R CLUNE INC                  
                                                            5-02           14,187                  09/18/09   10/26/09    GALUSHA & SONS LLC                  
                                                            5-03           16,567                  09/18/09   10/26/09    GALUSHA & SONS LLC                  
                                                            5-04           10,042                  12/11/09   02/12/10    GALUSHA & SON,LLC                   
                                                            5-05           23,841                  12/11/09   02/12/10    GALUSHA & SON,LLC                   
                                                            5-06            9,862                  09/12/11   10/24/11    GALUSHA & SONS LLC                  
                                                            5-07           13,958                  09/12/11   10/24/11    GALUSHA & SONS LLC                  
                                                            5-08           11,827                  09/12/11   10/24/11    GALUSHA & SONS LLC                  
                                                            5-09            2,503                  09/12/11   10/24/11    GALUSHA & SONS LLC                  
                                                            5-10           17,050                  09/12/11   10/24/11    GALUSHA & SONS, LLC                 
                                                            6-02          -28,519                  06/27/11   07/27/11    T.P. MONAHAN INC                    
                                                            ASB1-01             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            ASB1-02             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            ASB1-03             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            ASB1-04             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            ASB1-05             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            ASB1-06             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            ASB1-07             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            ASB1-08             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            BR1-01              0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-002             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-003             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-004             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-005             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-006             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-007             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-008             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-009             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-010             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-011             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-012             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-013             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-015             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-016             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F01-017             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            F04-01              0                  01/03/13   07/03/13    Harold R. Clune, Inc.               
                                                            FDA1-01             0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
                                                            FO1-014             0                  01/03/13   03/11/13    BAST HATFIELD INC                   
                                                            FO1-018             0                  01/03/13   03/11/13    BAST HATFIELD INC                   
                                                            FO2-01              0                  01/03/13   09/18/13    ROZELLE EAST INC                    
                                                            FO2-02              0                  01/03/13   07/16/13    ROZELLE EAST INC                    
                                                            FO2-03              0                  01/03/13   07/16/13    Rozell East, Inc.                   
                                                            FO2-04              0                  01/03/13   07/03/13    Rozell East, Inc.                   
                                                            FO2-05              0                  01/03/13   08/16/13    Rozell East, Inc.                   
                                                            FO2-06              0                  01/03/13   07/16/13    Rozell East, Inc.                   
                                                            FO2-07              0                  01/03/13   08/16/13    Rozell East, Inc.                   
                                                            FO2-08              0                  01/03/13   08/16/13    Rozell East, Inc.                   
                                                            FO3-02              0                  01/03/13   09/18/13    DIGESARE MECHANICAL INC             
                                                            FO3-03              0                  01/03/13   07/03/13    DiGesare Mechanical, Inc.           
                                                            FO3-04              0                  01/03/13   07/03/13    DiGesare Mechancial, Inc.           
                                                            FO3-05              0                  01/03/13   08/16/13    DiGesare Mechanical, Inc.           
                                                            FO3-06              0                  01/03/13   07/16/13    DiGesare Mechanical, Inc.           
                                                            FO4-02              0                  01/03/13   07/03/13    Harold R. Clune, Inc.               
                                                            FO4-04              0                  01/03/13   07/16/13    HAROLD R. CLUNE, INC                
                                                            FO4-05              0                  01/03/13   08/16/13    Harold R. Clune, Inc.               
                                                            FO4-06              0                  01/03/13   07/16/13    Harold R. Clune, Inc.               
                                                            FO4-07              0                  01/03/13   07/03/13    Harold R. Clune, Inc.               
                                                            FO4-08              0                  01/03/13   08/16/13    Harold R. Clune, Inc.               
                                                            FO4-09              0                  01/03/13   07/03/13    Harold R. Clune, Inc.               
                                                            FO5-03              0                  01/03/13   03/11/13    GALUSHA & SONS LLC                  
                                                            FO6-02              0                  01/03/13   03/11/13    T.P. MONAHAN INC                    
                                                            MR1-01              0                  01/03/13   03/11/13    Bast Hatfield, Inc.                 
 
18-1194   Reconstruction               0-001-007  03/08/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -5,000                  10/17/19   10/31/19    PTL CONTRACTING, CORP.              
 
20-0960   Reconstruction               0-001-008  06/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           34,910                  04/15/21   06/23/21    MID-STATE INDUSTRIES, LTD           
                                                            101-01              0                  04/15/21   06/23/21    MID-STATE INDUSTRIES, LTD.          
 
21-0386   Reconstruction               0-001-009  12/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1445SC Visual Structural Inspection 0-001-SC1  09/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
08-0322   Reconstruction               5-002-002  03/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-047          51,959                  09/12/11   10/24/11    BAST HATFIELD INC                   
                                                            4-14            1,417                  09/12/11   12/08/11    HAROLD R CLUNE INC                  
                                                            4-16            7,003                  10/18/11   04/16/12    HAROLD R CLUNE INC                  
                                                            5-01            5,540                  09/18/09   10/26/09    GALUSHA & SONS LLC                  
                                                            5-11           23,298                  11/23/11   03/30/12    GALUSHA & SONS LLC                  
                                                            6-01             -313                  04/13/10   05/28/10    T.P. MONAHAN INC                    
                                                            FO3-01              0                  01/03/13   09/19/13    DIGESARE MECHANICAL INC             
                                                            FO5-02              0                  01/03/13   03/11/13    Galusha & Sons, LLC                 
                                                            FO6-01              0                  01/03/13   03/11/13    T. P. Monahan, Inc.                 
 

TICONDEROGA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-15-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
96-0712   Reconstruction               0-001-003  02/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1627   Additions and Alterations    0-001-004  04/26/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,052                  04/03/02   05/06/02    Brockway Mech.                      
 
04-0558   Additions and Alterations    0-001-005  03/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              -5,120                  06/20/05   06/30/05    Environmental Remediation Service   
                                                            1             -18,335                  06/20/05   06/30/05    Control technologies                
                                                            1             -81,135                  06/20/05   06/30/05    Bayview electric                    
                                                            1            -273,906                  06/20/05   06/30/05    RF Gordon mechanical                
                                                            1                   0                  08/24/05   09/01/05    Murnane Building Contractors        
                                                            1              -4,830                  09/20/05   09/27/05    Kand L Plumbing                     
                                                            10                907                  10/18/05   12/27/06    RF Gordon Mechanical                
                                                            12                971                  03/06/06   06/30/06    RF Gordon Mechanical                
                                                            14              3,364                  04/11/06   05/26/06    RF Gordon Mechanical                
                                                            2               3,384                  06/20/05   06/30/05    Bayview Electric                    
                                                            2             -10,000                  09/20/05   09/27/05    Environmental Remediation           
                                                            2              -5,000                  12/27/05   01/11/06    K and L Plumbing Heating            
                                                            3              66,750                  06/20/05   06/30/05    RF Gordon Mechanical                
                                                            3             -15,000                  06/20/05   06/30/05    Scott Hull Construction             
                                                            3              -6,000                  08/24/05   09/01/05    Control technologies                
                                                            4                 600                  09/20/05   01/12/07    Control Technologies                
                                                            4              14,520                  10/18/05   12/27/05    Bayview Electric                    
                                                            4                   0                  10/18/05   11/08/05    Murnane Building Contractors        
                                                            4             -14,600                  12/27/05   06/05/06    Scott Hull Construction             
                                                            5             -60,000                  08/24/05   09/01/05    RF Gordon mechanical                
                                                            5                   0                  10/18/05   11/08/05    Murnane Building Contractors        
                                                            5               9,499                  12/28/05   01/09/07    Bayview Electric                    
                                                            5             -20,000                  04/26/05   05/23/06    CONTROL TECHNOLOGIES                
                                                            6               3,472                  08/24/05   09/01/05    RF Gordon Mechanical                
                                                            6             -43,078                  03/28/06   06/05/06    scott Hull Construction             
                                                            7               9,379                  09/20/05   01/12/07    RF Gordon Mechanical                
                                                            7               6,192                  10/18/05   11/08/05    Murnane Building Contractors        
                                                            7               9,379                  10/18/05   10/31/05    RF Gordon Mechanical                
                                                            8                 923                  09/20/05   01/12/07    RF Gordon Mechanical                
                                                            8               1,451                  12/27/05   12/27/06    Murnane Building                    
 
08-0348   Additions and Alterations    0-001-006  03/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-02          -4,802                  04/12/12   09/06/12    CFI CONSTRUCTION INC                
                                                            01-06          19,405                  04/12/12   08/14/12    CFI CONSTRUCTION INC                
                                                            01-06A            394                  04/12/12   08/14/12    CFI CONSTRUCTION INC                
                                                            01-07         -19,883                  06/27/12   11/14/12    CFI Construction, Inc.              
                                                            01-09          -1,041                  05/25/12   10/09/12    CFI CONSTRUCTION INC                
                                                            02-01        -490,000                  01/13/10   03/16/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-02        -100,000                  01/13/10   02/22/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-05         -23,000                  01/13/10   03/12/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-07         -30,000                  01/13/10   03/12/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-08         -80,000                  01/13/10   02/22/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-10         -61,000                  04/12/12   09/14/12    MURNANE BUILDING CONTRACTORS INC    
                                                            02-11          -2,120                  04/12/12   08/14/12    MURNANE BUILDING CONTRACTORS INC    
                                                            02-12            -681                  06/30/14   08/27/14    MURNANE BUILDING CONTRACTORS,INC    
                                                            02-14          -2,734                  06/30/14   07/24/14    MURNANE BUILDING CONTRACTORS,INC    
                                                            03-01         -93,909                  04/12/12   08/29/12    R.F. GORDON MECHANICAL INC          
                                                            03-02         -37,176                  04/12/12   08/29/12    R.F. GORDON MECHANICAL INC          
                                                            03-06           7,238                  04/12/12   08/29/12    R.F. GORDON MECHANICAL INC          
                                                            03-07          37,319                  04/12/12   08/29/12    R.F. GORDON MECHANICAL INC          
                                                            03-08          12,939                  04/12/12   08/29/12    R.F. GORDON MECHANICAL INC          
                                                            03-09          -4,422                  06/30/14   07/24/14    R.F. GORDON MECHANICAL,INC          
                                                            04-01         -35,645                  04/12/12     /  /      HOUR ELECTRIC CO INC                
                                                            04-02         -18,041                  04/12/12   08/29/12    HOUR ELECTRIC CO INC                
                                                            04-03         -27,007                  04/12/12   09/07/12    HOUR ELECTRIC CO INC                
                                                            04-07          10,259                  04/12/12   08/29/12    HOUR ELECTRIC CO INC                
                                                            04-08          12,211                  04/12/12   08/29/12    HOUR ELECTRIC CO INC                
                                                            04-11         -70,064                  04/12/12   09/07/12    HOUR ELECTRIC CO INC                
                                                            04-13           4,620                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-13A         -4,620                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-14          37,929                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-15          -6,916                  06/30/14   07/24/14    HOUR ELECTRIC CO,INC                
                                                            05-01         -17,903                  01/13/10   03/30/10    JOHN V. WARREN INC                  
                                                            05-04         -31,788                  01/13/10   03/30/10    JOHN V WARREN INC                   
                                                            05-05           6,664                  06/26/13   08/15/13    JOHN V WARREN INC                   
                                                            05-06           7,244                  04/12/12   09/06/12    JOHN V WARREN INC                   
                                                            05-07          -4,585                  04/12/12   09/06/12    JOHN V WARREN INC                   
                                                            05-08          -1,324                  06/26/13   08/21/13    JOHN V WARREN INC                   
                                                            07-01         -16,212                  05/11/12   09/14/12    MURNANE BUILDING CONTRACTORS INC    
 
15-0775   Reconstruction               0-001-007  01/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06-001         16,563                  09/19/16   10/18/16    S&L Roofing & Sheetmetal, Inc.      
                                                            06-003          5,587                  11/03/16   11/07/16    S&L Roofing & Sheetmetal, Inc.      
 
16-0175   Reconstruction               0-001-008  03/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-02-001        6,469                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-002      -20,000                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-003          315                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-004       -1,770                  04/20/18   08/06/18    VMJR Companies, LLC                 
                                                            2-02-005          369                  04/20/18   08/06/18    VMJR Companies, LLC                 
                                                            2-02-006        2,310                  07/18/18   08/06/18    VMJR COMPANIES LLC                  
                                                            2-02-007        1,969                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-008       20,735                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-009        8,167                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-010        7,328                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-011         -814                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-02-012       -1,000                  11/21/18   01/24/19    VMJR Companies, LLC                 
                                                            2-03-001            0                  04/20/18   04/25/18    T. McElligott, Inc.                 
                                                            2-03-001      -15,500                  04/20/18   04/25/18    T. McElligott, Inc.                 
                                                            2-03-002       -2,000                  04/20/18   04/25/18    T. McElligott, Inc.                 
                                                            2-03-003       -6,000                  04/20/18   04/25/18    T. McElligott, Inc.                 
                                                            2-03-004      -11,000                  04/20/18   04/25/18    T. McElligott, Inc.                 
                                                            2-03-005       -7,000                  04/20/18   04/25/18    T. McElligott, Inc.                 
                                                            2-03-006       -5,000                  04/20/18   04/25/18    T. McElligott, Inc.                 
                                                            2-03-007       -8,733                  07/18/18   12/28/18    T. MCELLIGOTT INC                   
                                                            2-04-001            0                  10/31/18   11/09/18    VMJR COMPANIES LLC                  
                                                            2-04-001       26,697                  12/03/18   01/25/19    VMJR COMPANIES LLC                  
                                                            2-04-002            0                  10/31/18   11/09/18    VMJR COMPANIES LLC                  
                                                            2-04-002        8,253                  12/03/18   01/25/19    VMJR COMPANIES LLC                  
                                                            2-04-003            0                  10/31/18   11/09/18    VMJR COMPANIES LLC                  
                                                            2-06-001            0                  10/31/18   11/09/18    VMJR COMPANIES LLC                  
                                                            2-06-001        1,633                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-06-002       -3,000                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-06-003       29,892                  10/31/18   11/09/18    VMJR COMPANIES LLC                  
                                                            2-06-004       16,585                  10/31/18   03/12/19    VMJR COMPANIES, LLC                 
                                                            2-06-005       -4,406                  11/05/18   01/24/19    VMJR COMPANIES LLC                  
                                                            2-06-006            0                  11/21/18     /  /      VMJR                                
                                                            2-06-006        3,390                  11/21/18   01/24/19    VMJR Companies, LLC                 
                                                            2-06-007       -5,221                  12/03/18   01/25/19    VMJR COMPANIES LLC                  
                                                            2-07-001      -10,000                  07/18/18   12/28/18    AUDIO-VIDEO CORP                    
                                                            AD202001            0                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            AD203002            0                  07/18/18   12/28/18    T. MCELLIGOTT INC                   
                                                            AD204004            0                  12/03/18   01/25/19    VMJR COMPANIES LLC                  
                                                            AD206002       -2,835                  04/20/18   08/06/18    VMJR Companies, LLC                 
                                                            AD206003         -707                  04/20/18   08/06/18    VMJR Companies, LLC                 
                                                            AD206004      -21,550                  04/20/18   08/06/18    VMJR Companies, LLC                 
                                                            AD206005            0                  11/07/18   01/04/19    VMJR COMPANIES, LLP                 
                                                            AD206006            0                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            AD206007            0                  10/31/18   03/12/19    VMJR COMPANIES, LLC                 
                                                            AD206008            0                  10/31/18   03/12/19    VMJR COMPANIES, LLC                 
                                                            AD206009            0                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            AD206010            0                  10/31/18   01/24/19    VMJR COMPANIES LLC                  
                                                            AD206011            0                  11/21/18   01/24/19    VMJR Companies, LLC                 
 
22-1568   Reconstruction               0-001-009  03/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0068   Reconstruction               0-001-010  11/27/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary/Middle:
96-0713   Reconstruction               0-006-004  02/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1628   Additions and Alterations    0-006-005  04/26/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -6,196                  07/29/02   08/16/02    Murnane Bldg. Contractors           
                                                            1              -8,598                  07/29/02   08/16/02    Gross Elec.                         
 
04-0559   Reconstruction               0-006-006  03/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,180                  06/20/05   06/30/05    Scott hull Construction             
                                                            1             -81,135                  06/20/05   06/30/05    Bayview Electric                    
                                                            1            -273,906                  06/20/05   06/30/05    RF Gordon Mechanical                
                                                            1             -18,335                  06/20/05   06/30/05    Control Technologies                
                                                            10             -1,548                  04/11/06   06/05/06    Murnane Building Contractors        
                                                            11               -901                  03/03/06   06/30/06    RF Gordon Mechanical                
                                                            13              1,000                  04/11/06   05/26/06    RF Gordon Mechanical                
                                                            2              -4,550                  06/20/05   06/30/05    Scott Hull Construction             
                                                            2              48,343                  06/20/05   06/30/05    RF Gordon Mechanical                
                                                            2               2,555                  06/20/05   06/30/05    Control Tech                        
                                                            2                   0                  08/24/05   09/01/05    Murnane Building Contractors        
                                                            3               1,692                  06/20/05   06/30/05    Bayview Electric                    
                                                            3                   0                  09/20/05   01/12/07    Murnane Building Contractors        
                                                            3                   0                  10/18/05   11/08/05    Murnane Building Contractors        
                                                            5                   0                  12/27/05   06/05/06    Scott Hull Construction             
                                                            6               1,014                  10/18/05   11/08/05    Murnane Building Contractors        
                                                            6              -5,000                  04/11/06   05/26/06    Bayview Electric                    
                                                            9               2,476                  09/20/05   10/31/05    RF gordon Mechanical                
                                                            9               2,476                  10/18/05   10/31/05    RF Gordon mechanical                
 
08-0349   Additions and Alterations    0-006-008  03/16/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01          27,879                  04/12/12   09/06/12    CFI CONSTRUCTION INC                
                                                            01-03            -962                  04/12/12   09/06/12    CFI CONSTRUCTION INC                
                                                            01-04          -4,635                  04/12/12   09/06/12    CFI CONSTRUCTION INC                
                                                            01-05        -100,000                  04/12/12   08/14/12    CFI CONSTRUCTION INC                
                                                            01-08            -292                  05/25/12   10/09/12    CFI CONSTRUCTION INC                
                                                            02-03         -85,000                  01/13/10   02/22/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-04        -200,000                  01/13/10   02/22/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-06          -9,000                  01/13/10   02/22/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-09         -14,000                  01/13/10   02/22/10    MURNANE BUILDING CONTRACTORS INC    
                                                            02-13          -3,875                  06/30/14   07/24/14    MUNANE BUILDING CONTRACTORS,INC     
                                                            02-13          -3,875                  06/30/14   09/03/14    Murnane Building Contractors        
                                                            03-03         -69,100                  04/12/12   09/06/12    R.F. GORDON MECHANICAL INC          
                                                            03-04         -34,650                  04/12/12   09/06/12    R.F. GORDON MECHANICAL INC          
                                                            03-05         -29,174                  04/12/12     /  /      R.F. GORDON MECHANICAL INC          
                                                            03-10          -1,645                  06/30/14   07/24/14    R.F. GORDON MECHANICAL,INC          
                                                            04-04         -13,364                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-05          -6,775                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-06          14,693                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-09          30,447                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-10          46,978                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-12        -104,128                  04/12/12   09/06/12    HOUR ELECTRIC CO INC                
                                                            04-16          -8,735                  06/30/14   07/24/14    HOUR ELECTRIC CO,INC                
                                                            05-02          -1,999                  01/13/10   02/22/10    JOHN V WARREN INC                   
                                                            05-03         -11,190                  01/13/10   02/22/10    JOHN V WARREN INC                   
                                                            06-01         -20,000                  04/12/12   08/14/12    JOSEPH FILHAN CO                    
 
15-0776   Reconstruction               0-006-009  01/27/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001         32,681                  09/19/16   10/18/16    Peckham Road Corporation            
                                                            01-002         -1,227                  09/19/16   10/18/16    Peckham Road Corporation            
                                                            01-003          5,703                  09/19/16   10/18/16    Peckham Road Corporation            
                                                            01-004          6,778                  10/11/16   10/18/16    Peckham Road Corporation            
                                                            01-005            345                  10/11/16   10/18/16    Peckham Road Corporation            
                                                            01-006          1,082                  12/05/16   12/07/16    Peckham Road Corporation            
                                                            01-007           -850                  12/08/16   12/09/16    Peckham Road Corporation            
                                                            06-002          8,681                  09/19/16   10/18/16    S&L Roofing & Sheetmetal, Inc.      
                                                            06-004            361                  11/03/16   11/07/16    S&L Roofing & Sheetmetal, Inc.      
 

          Central Office:
04-0560   Reconstruction               1-002-002  03/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
04-0561   Reconstruction               5-003-003  03/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,180                  06/20/05   06/30/05    Scott hull Construction             
                                                            4                 881                  08/24/05   09/01/05    RF Gordon mechanical                
                                                            9               1,406                  12/27/05   06/05/06    Murnane Building Contractors        
 
08-0350   Reconstruction               5-003-004  03/16/09  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0965   Reconstruction               5-003-005  02/07/22  NO CHANGE ORDERS ON ELECTRONIC FILE

WESTPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-16-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
95-1048   Additions and Alterations    0-001-002  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0057   Reconstruction               0-001-004  08/04/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0351   Additions and Alterations    0-001-005  01/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -44,484                  03/26/03   04/17/03    Conroy & Conroy Contractors         
                                                            1               3,600                  03/28/03   04/17/03    Dow Elec.                           
                                                            1              -1,922                  08/14/03   08/26/03    LH LaPlante                         
                                                            1              -5,000                  02/12/04   04/07/04    JS McHugh                           
                                                            2               4,368                  03/26/03   04/17/03    Conroy & Conroy Contractor          
                                                            2                -818                  09/19/03   11/26/03    Dow Elec.                           
                                                            2             -19,082                  02/26/04   03/12/04    LH Plante                           
                                                            3                -738                  11/19/03   01/08/04    Dow Elec.                           
                                                            3              -1,000                  02/26/05   03/24/05    conroy and Conroy Contractors       
                                                            4                -235                  11/19/03   01/08/04    Dow Elec.                           
                                                            5             -15,212                  03/23/04   04/30/04    Dow Elec.                           
                                                            6                -283                  12/30/03   03/15/04    Conroy & Conroy Contractors         
                                                            6                -800                  03/23/04   04/13/04    Dow Elec.                           
                                                            7               4,200                  03/23/04   04/06/04    Conroy & Conroy Contractors         
                                                            8               5,094                  03/23/04   04/06/04    Conroy & Conroy Contractors         
 
12-0189   Reconstruction               0-001-006  01/16/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO.01       45,298                  07/01/13   07/19/13    Murnane Building Contractors        
 
16-0957   Reconstruction               0-001-007  02/02/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-CO.01        5,150                  05/01/18   06/01/18    Harold R. Clune, Inc.               
                                                            EC-CO.02        3,555                  05/01/18   06/01/18    Harold R. Clune, Inc.               
 
16-1498   Reconstruction               0-001-008  02/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0950   Reconstruction               0-001-009  08/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Garage:
95-1049   Additions and Alterations    3-002-001  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Utility Garage:
11-0073   New Construction             3-004-001  09/08/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-CO.01       -7,298                  10/26/11   12/23/11    BESSBORO BUILDERS & SUPPLIES INC    
                                                            GC-CO.02         -200                  12/21/11   08/07/12    BESSBORO BUILDERS & SUPPLIES INC    
 

WILLSBORO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 15-17-01-04
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building(bldg sold):
92-1591   Reconstruction               0-001-006  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0724   Reconstruction               0-001-007  02/25/95  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0409SC Visual Structural Inspection 0-001-SC1  11/03/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular Classroom Bldg:
94-0421   New Construction             0-006-001  01/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          K-12 School:
99-0084   New Construction             0-007-001  10/27/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            10              2,123                  05/31/05   06/10/05    Harold Clune                        
                                                            11              4,346                  05/31/05   06/10/05    Harold R Clune                      
                                                            12                -25                  05/31/05   06/10/05    Harold R Clune                      
                                                            8               4,975                  08/22/01   03/27/02    Harold Clune                        
                                                            9               5,881                  08/22/01   03/27/02    Harold Clune                        
                                                            AE-1           41,200                  07/14/00   12/02/03    Facilities Equip.                   
                                                            GC-2            6,752                  05/31/05   06/10/05    David Christopher                   
                                                            GC-5                0                  09/06/01   01/08/02    David Christopher                   
 
07-1589   Reconstruction               0-007-003  04/18/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001         -10,500                  10/09/08   10/28/08    HAROLD R. CLUNE, INC.               
                                                            E-002          -2,500                  07/14/09   11/13/09    HAROLD R CLUNE INC                  
 
16-0793   Reconstruction               0-007-004  06/22/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1284   Reconstruction               0-007-005  11/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0193   Reconstruction               0-007-007  12/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0249   Reconstruction               0-007-008  11/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0376   Reconstruction               0-007-009  10/06/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
03-0066   New Construction             7-008-001  01/13/05  NO CHANGE ORDERS ON ELECTRONIC FILE