BEACON CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-02-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
90-1494   Reconstruction               0-001-007  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1458   Reconstruction               0-001-008  06/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0102   Reconstruction               0-001-009  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1448   Reconstruction               0-001-010  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0881   Reconstruction               0-001-011  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0727   Reconstruction               0-001-012  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0272SC Visual Structural Inspection 0-001-SC1  09/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          James Forrestal School:
92-0600   Reconstruction               0-002-005  02/26/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1603   Reconstruction               0-002-006  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0882   Reconstruction               0-002-008  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0728   Reconstruction               0-002-009  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0979   Reconstruction               0-002-010  05/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0629   Reconstruction               0-002-011  04/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A & B          11,147                  01/09/01   02/06/02    Millers Minuteman Const.            
 
05-0495   Alterations                  0-002-012  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,217                  02/27/08   08/05/08    C.B strain & son                    
 
07-0761   Reconstruction               0-002-013  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003          -2,000                  02/09/09   02/27/09    UNITY MECHANCIAL                    
                                                            00003          -9,000                  02/09/09   03/04/09    KOKO CONTRACTING, INC.              
                                                            00004           4,687                  02/09/09   03/05/09    MEYER CONTRACTING                   
                                                            00007          -5,250                  12/04/08   04/22/09    EAST COAST HAZ MAT REMOVAL          
                                                            00009            -783                  08/28/09   09/17/09    MEYER CONTRACTING                   
 
09-0075   Reconstruction               0-002-014  12/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1.5             5,767                  06/05/12   10/24/12    SISCA NORTHEAST INC                 
                                                            2.3            -1,180                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.9             9,412                  09/11/12   12/19/12    KIRCHHOFF-CONSIGLI                  
                                                            3.2A            1,043                  08/24/11   11/08/11    DJ HEATING                          
                                                            4.1               296                  08/24/11   11/08/11    DJ HEATING & AIR CONDITIONING       
                                                            EC-02               0                  07/30/14   08/20/14    Ray S. Pantel Electric              
 
09-1166   Reconstruction               0-002-015  10/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            000006         -9,971                  07/30/14   08/27/14    Roundout Electric                   
                                                            002             2,694                  07/30/14   10/14/14    Nurzia Construction Company         
 
10-1123   Reconstruction               0-002-016  06/17/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2.A              -745                  02/16/12   09/12/12    CONKLIN SERVICES & CONSTRUCTION     
 
13-0691   Reconstruction               0-002-017  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0025   Reconstruction               0-002-018  02/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0249   Reconstruction               0-002-019  11/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-10          13,741                  03/16/20   07/06/20    J&J SASS ELECTRIC, INC.             
                                                            EC-3            4,832                  10/29/19   11/20/19    J&J SASS ELECTRIC, INC.             
                                                            GC-4           -1,104                  10/29/19   10/30/19    MEYER CONTRACTING CORP.             
                                                            GC-9                0                  12/18/19   01/02/20    MEYER CONTRACTING, CORP.            
 
21-1356   Reconstruction               0-002-020  05/17/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0994   Reconstruction               0-002-021  04/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0899SC Visual Structural Inspection 0-002-SC1  03/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          South Ave. School:
90-1495   Reconstruction               0-003-003  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1459   Reconstruction               0-003-004  06/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1449   Reconstruction               0-003-005  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0883   Reconstruction               0-003-006  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0729   Reconstruction               0-003-007  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0496   Alterations                  0-003-008  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,447                  02/06/08   03/19/08    C.B. Strain & Son                   
 
07-0762   Reconstruction               0-003-009  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  07/31/08   08/05/08    East Coast Haz Mat Removal          
                                                            00001          -8,025                  10/13/08   01/27/09    MEYER CONTRACTING                   
                                                            00001          -6,820                  02/09/09     /  /      UNITY MECHANCIAL                    
                                                            00001          -1,056                  12/18/09   01/12/10    CALADRI DEVELOPMENT                 
                                                            00002          -3,300                  08/27/08   10/21/08    East Coast Haz Mat Removal          
                                                            00002            -805                  12/18/08   01/30/09    CANALE ELECTRIC                     
                                                            00002           7,884                  02/09/09   03/05/09    MEYER CONTRACTING                   
                                                            00002          -4,000                  02/09/09   03/04/09    KOKO CONTRACTING, INC.              
                                                            00003          -1,910                  02/12/09   02/12/09    CANALE ELECTRIC                     
                                                            00003          13,017                  02/09/09   03/05/09    MEYER CONTRACTING                   
                                                            00003         -10,077                  02/07/11   03/01/11    CALADRI DEVELOPMENT                 
                                                            00004          -7,320                  11/14/08   01/30/09    EAST COST HAZ MAT REMOVAL           
                                                            00004          -2,000                  02/09/09   02/27/09    UNITY MECHANCIAL                    
                                                            00004          -2,200                  04/15/09   08/06/09    CANALE ELECTRIC                     
                                                            00006           1,464                  02/09/09   03/05/09    MEYER CONTRACTING                   
                                                            00006          40,800                  10/23/09   11/20/09    UNITY MECHANICAL                    
                                                            00007            -641                  04/01/09   07/21/09    MEYER CONTRACTING                   
                                                            00007           1,056                  11/23/09   03/30/10    UNITY MECHANICAL                    
                                                            00008          -9,850                  12/04/08   04/22/09    EAST COAST HAZ MAT REMOVAL          
                                                            00008           2,200                  04/15/09   07/23/09    MEYER CONTRACTING                   
 
09-0076   Reconstruction               0-003-010  12/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1.2A            3,500                  08/24/11   09/07/11    SISCA NORTHEAST                     
                                                            2.5            -1,180                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.5A              697                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            4.6              -158                  06/05/12   07/03/13    DJ HEATING & AIR CONDITIONING       
 
09-1167   Reconstruction               0-003-011  10/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            000001              0                  07/30/14   08/27/14    Construction Services               
                                                            000004            229                  07/30/14   08/27/14    Construction Services               
                                                            000007         -1,085                  07/30/14   08/27/14    Roundout Electric                   
                                                            004             9,401                  07/30/14   10/14/14    Nurzia Construction Company         
 
10-1124   Reconstruction               0-003-012  06/17/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1.A              -686                  02/16/12   09/12/12    CONKLIN SERVICES & CONSTRUCTION     
 
13-0692   Reconstruction               0-003-013  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0026   Reconstruction               0-003-014  02/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0250   Reconstruction               0-003-015  11/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-04             844                  11/26/19   12/17/19    J&J SASS ELECTRIC, INC.             
                                                            EC-06           1,125                  12/18/19   12/31/19    J&J SASS ELECTRIC, INC.             
                                                            EC-09             433                  03/16/20   07/06/20    J&J SASS ELECTRIC, INC.             
                                                            GC-12          -3,436                  12/18/19   01/02/20    MEYER CONTRACTING CORP.             
                                                            MC-1            3,735                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-10           7,750                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-11            -365                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-5R1          3,891                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-6R1          5,186                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-7R1          3,575                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-8R1          1,125                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-9            5,887                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
 
22-0995   Reconstruction               0-003-016  04/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rombout Middle School:
90-1496   Reconstruction               0-004-003  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1604   Reconstruction               0-004-004  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0103   Reconstruction               0-004-005  08/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0884   Reconstruction               0-004-007  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0730   Reconstruction               0-004-008  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0980   Reconstruction               0-004-009  05/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1035   Additions and Alterations    0-004-010  05/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,283                  12/05/05     /  /      Environmental Remediation Service   
                                                            1              28,260                  12/21/05   10/05/06    Arris Contracting Co                
                                                            1               6,796                  02/23/06   04/20/06    P and D Electric                    
                                                            1               7,525                  07/05/06   07/13/06    Frank Lindy Plumbing                
                                                            1              11,000                  04/27/06   07/24/06    DeRosa Tennis Contracting           
                                                            1-REVI          6,796                  08/30/07   09/06/07    P & D ELECTRIC OF HUDSON VALLEY     
                                                            2              -5,000                  07/21/06   07/24/06    DeRosa Tennis Contractors           
                                                            2              32,585                  11/15/06   01/09/07    Sun Up Enterprises                  
                                                            2              -3,558                  05/10/07   05/16/07    Frank Lindy Plumbing                
                                                            3              13,900                  12/01/06   12/27/06    Sun Up Enterprises                  
                                                            7               3,250                  11/16/06   01/09/07    Arris Contracting                   
 
07-0763   Reconstruction               0-004-011  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            00001         -10,688                  11/14/08   02/05/09    CANALE ELECTRIC                     
                                                            00001          -2,000                  02/09/09   03/04/09    KOKO CONTRACTING, INC.              
                                                            00006-R        -2,450                  12/04/08   04/22/09    EAST COAST HAZ MAT REMOVAL          
 
09-0077   Reconstruction               0-004-012  12/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00006           3,022                  07/30/14   08/20/14    Ray S. Pantel, Inc.                 
                                                            1.1             2,700                  08/24/11   09/07/11    SISCA NORTHEAST INC                 
                                                            2.2             2,329                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.6             5,386                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            4.3            -3,500                  06/05/12   07/03/13    DJ HEATING & AIR CONDITIONING       
 
09-0097   Reconstruction               0-004-013  09/30/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -4,177                  04/15/10   06/25/10    DELEONARDIS ELECTRIC INC            
                                                            EC-01             823                  02/22/10   12/14/11    DELEONARDIS ELECTRIC                
 
09-1168   Reconstruction               0-004-014  10/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0000002        -1,300                  07/30/14   08/27/14    Construction Services               
                                                            0000010         2,638                  07/30/14   08/27/14    Roundout Electric                   
                                                            001             6,372                  07/30/14   10/03/14    Nurzia Construction Company         
                                                            4.1A          -12,617                  04/10/12   06/28/13    RONDOUT ELECTRIC                    
                                                            4.4            10,190                  04/10/12   10/05/12    RONDOUT ELECTRIC                    
                                                            4.5             6,800                  04/10/12   10/05/12    RONDOUT ELECTRIC                    
 
10-1125   Reconstruction               0-004-015  06/17/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3.A               -42                  02/16/12   09/12/12    CONKLIN SERVICES & CONSTRUCTION     
 
13-0693   Reconstruction               0-004-018  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0027   Reconstruction               0-004-019  02/11/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001              0                  01/10/19   02/05/19    MEYER CONTRACTING CORP.             
 
18-0251   Reconstruction               0-004-020  11/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-7           11,435                  12/18/19   12/31/19    J&J SASS ELECTRIC INC.              
                                                            GC-1         -118,000                  10/29/19   10/30/19    MEYER CONTRACTING CORP.             
                                                            GC-10          -7,890                  12/18/19   01/02/20    MEYER CONTRACTING CORP.             
                                                            GC-11         -13,448                  12/18/19   01/02/20    MEYER CONTRACTING CORP.             
                                                            GC-7           -8,000                  10/30/19   11/04/19    MEYER CONTRACTING CORP.             
                                                            GC-8                0                  12/18/19   01/02/20    MEYER CONTRACTING CORP.             
                                                            PC-1           -1,901                  10/30/19   11/01/19    SOUTHEAST PLUMBING CORP.            
                                                            PC-2          -11,799                  12/18/19   12/31/19    SOUTHEAST PLUMBING CORP.            
 
21-1304   Reconstruction               0-004-021  05/10/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1357   Reconstruction               0-004-022  05/17/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0996   Reconstruction               0-004-023  04/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
00-2000SC Visual Structural Inspection 0-004-SC1  06/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Glenham Elementary School:
90-1236   Reconstruction               0-006-007  04/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1450   Reconstruction               0-006-008  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0885   Reconstruction               0-006-009  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0731   Reconstruction               0-006-010  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0545   Additions and Alterations    0-006-011  12/31/97  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0497   Alterations                  0-006-013  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -17,200                  05/10/07   09/11/07    Suburban Restoration                
                                                            3              -2,100                  05/10/07   05/16/07    CB Strain and Son                   
 
07-0764   Reconstruction               0-006-014  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  08/01/08   10/07/08    EAST COAST HAZ MAT REMOVAL          
                                                            00001         -40,000                  11/23/09   03/16/10    ARCH CONCEPT CONSTRUCTION INC       
                                                            00003          22,500                  11/14/08   01/30/09    EAST COAST HAZ MAT REMOVAL          
                                                            00005            -283                  02/09/09     /  /      MEYER CONTRACTING                   
                                                            00005            -283                  02/09/09   03/05/09    MEYER CONTRACTING                   
                                                            00005            -954                  05/06/09   07/29/09    CANALE ELECTRIC                     
                                                            00009          -2,450                  12/04/08   04/22/09    EAST COAST HAZ MAT REMOVAL          
 
09-0078   Reconstruction               0-006-015  12/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00005           4,338                  11/23/11   02/21/12    RAY S PANTEL INC                    
                                                            2.1A            6,200                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.4A            4,800                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            4.7              -498                  06/05/12   07/03/13    DJ HEATING & AIR CONDITIONING       
                                                            EC-01           2,859                  11/23/11   02/21/12    RAY S PANTEL ELECTRIC               
                                                            EC-03               0                  07/30/14   08/20/14    Ray S. Pantel Electric              
 
09-1169   Reconstruction               0-006-016  10/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            000008          5,669                  07/30/14   08/27/14    Roundout Electric                   
                                                            2.1            -5,000                  11/23/11   02/21/12    JOE LOMBARDO PLUMBING & HEATING     
                                                            3.1A           -1,552                  11/23/11   02/21/12    DJ HEATING & AIR CONDITIOHNING      
                                                            3.2              -188                  04/10/12   10/05/12    DJ HEATING & AIR CONDITIONING       
                                                            3.2A           -3,259                  04/10/12   10/05/12    DJ HEATING & AIR CONDITIONING       
 
10-1126   Reconstruction               0-006-017  06/17/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4.A              -506                  02/16/12   09/12/12    CONKLIN SERVICES & CONSTRUCTION     
 
13-0694   Reconstruction               0-006-018  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0028   Reconstruction               0-006-019  02/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0252   Reconstruction               0-006-020  11/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-2          -15,000                  10/29/19   10/30/19    MEYER CONTRACTING CORP.             
                                                            GC-5           -6,720                  10/29/19   10/30/19    MEYER CONTRACTING CORP.             
 
21-1358   Reconstruction               0-006-021  05/17/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0997   Additions and Alterations    0-006-022  04/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sargent Elementary School:
92-1460   Reconstruction               0-008-006  06/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1451   Reconstruction               0-008-007  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0886   Reconstruction               0-008-008  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0732   Reconstruction               0-008-009  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0546   Alterations                  0-008-010  12/31/97  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0498   Additions and Alterations    0-008-011  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              15,525                  05/10/07   05/16/07    Suburban Restoration                
                                                            2                -420                  02/06/08   08/12/08    C.B. Strain & Son                   
                                                            3               8,925                  02/27/08   08/05/08    C.B strain & son                    
 
07-0765   Reconstruction               0-008-012  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00005          -1,830                  11/14/08   01/30/09    EAST COAST HAZ MAT REMOVAL          
 
09-0079   Reconstruction               0-008-013  12/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00007           8,305                  07/30/14   08/20/14    Ray S. Pantel, Inc.                 
                                                            1.2            12,232                  08/24/11   09/07/11    SISCA NORTHEAST INC                 
                                                            2.3A            1,059                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.4            -1,180                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.7             4,755                  04/10/12   08/31/12    KIRCHHOFF-CONSIGLI                  
                                                            2.7A                0                  09/11/12   12/19/12    KIRCHHOFF-CONSIGLI                  
                                                            3.1A              640                  08/24/11   11/08/11    DJ HEATING                          
                                                            4.2             2,663                  08/24/11   11/08/11    DJ HEATING & AIR CONDITIONING       
                                                            4.4              -854                  06/05/12   07/03/13    DJ HEATING & AIR CONDITIONING       
                                                            6.3               600                  08/24/11   09/07/11    RAY S PANTEL INC                    
 
09-1170   Reconstruction               0-008-014  10/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            000003         24,129                  07/30/14   08/27/14    Construction Services               
                                                            000009          2,737                  07/30/14   08/27/14    Roundout Electric                   
                                                            003            27,844                  07/30/14   10/14/14    Nurzia Construction Company         
 
10-0167   Reconstruction               0-008-015  09/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -24,906                  11/23/11   04/05/12    CONKLIN SERVICES & CONSTRUCTION     
 
13-0695   Reconstruction               0-008-016  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0029   Reconstruction               0-008-017  02/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0253   Reconstruction               0-008-018  11/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-05           1,293                  11/26/19   12/17/19    J&J SASS ELECTRIC, INC.             
                                                            EC-08           3,397                  03/16/20   07/06/20    J&J SASS ELECTRIC, INC.             
                                                            GC-13          -3,328                  02/12/20   06/02/20    MEYER CONTRACTING CORP.             
                                                            GC-6          -10,240                  10/29/19   10/30/19    MEYER CONTRACTING CORP.             
                                                            MC-3           20,213                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            MC-4            2,721                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
 
21-1359   Reconstruction               0-008-019  05/17/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0998   Reconstruction               0-008-020  04/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Astor Day Care:
90-1497   Reconstruction               0-009-002  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Beacon High School:
99-0897   New Construction             0-020-001  05/04/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             197,009                  03/22/02   05/06/02    Roehrs Const.                       
                                                            1              18,800                  08/05/02   08/16/02    F&D Sprinklers                      
                                                            1              -1,046                  09/10/02   01/08/03    Commercial Appliance                
                                                            1               1,932                  11/08/02   01/08/03    Nickerson                           
                                                            1              -5,188                  03/18/03   03/20/03    Adirondack Cabling                  
                                                            1                -822                  03/19/03   03/24/03    BMI  Supply                         
                                                            1             -13,364                  08/06/04   09/09/04    Northeast Interior Systems          
                                                            10             18,926                  03/07/02   04/05/02    UW Marx                             
                                                            11             19,378                  02/11/02   03/22/02    UW Marx                             
                                                            12             12,837                  02/11/02   03/22/02    UW Marx                             
                                                            13             18,197                  03/22/02   05/06/02    UW Marx                             
                                                            14             11,504                  03/22/02   05/06/02    UW Marx                             
                                                            15             53,159                  09/10/02   01/08/03    UW Marx                             
                                                            16             33,946                  03/19/03     /  /      UW Marx                             
                                                            17             18,618                  03/19/03   03/24/03    UW Marx                             
                                                            18             21,212                  03/19/03   03/28/03    UW Marx                             
                                                            19R            22,313                  05/13/03   05/23/03    UW Marx                             
                                                            2             -54,150                  01/29/01   01/14/03    P&D Elec.                           
                                                            2              -2,268                  06/19/03   07/11/03    CB Strain & Son                     
                                                            2             -36,227                  06/19/03   07/11/03    CB Strain & Son                     
                                                            2              -5,789                  08/06/04   09/09/04    Nickerson Corp                      
                                                            2             -10,153                  08/06/04   09/09/04    Coomercial Appliance Contracts      
                                                            3              -8,946                  08/06/04   09/09/04    Sucato Building                     
                                                            3-R            -6,747                  10/06/03   12/05/03    CB Strain & Son                     
                                                            4               4,620                  01/18/02   03/22/02    P&D Elec.                           
                                                            4             -21,264                  04/23/04   04/28/04    CB Strain & Sons                    
                                                            5              36,470                  02/27/02   05/06/02    P&D Elec.                           
                                                            6              13,067                  02/27/02   05/06/02    P&D Elec.                           
                                                            7              23,915                  05/05/03   05/07/03    P&D Elec.                           
                                                            8               9,900                  08/21/01   01/09/02    UW Marx                             
                                                            8               6,999                  03/19/03   03/24/03    P&D Elec.                           
                                                            9              88,882                  01/28/02   06/21/05    UW Marx                             
 
05-0499   Alterations                  0-020-002  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              21,750                  11/15/06   01/09/07    Sun Up Enterprises                  
                                                            2               1,550                  02/27/08     /  /      C.B strain & son                    
                                                            4              -1,000                  01/12/07   01/30/07    Sun Up Enterprises                  
 
07-0766   Reconstruction               0-020-003  04/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          -1,200                  02/09/09     /  /      UNITY MECHANICAL                    
                                                            00005           9,538                  04/01/09   08/14/09    UNITY MECHANICAL                    
 
09-0080   Reconstruction               0-020-004  12/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1.1A           14,317                  08/24/11   09/07/11    SISCA NORTHEAST                     
                                                            1.3             3,520                  08/24/11   09/07/11    SISCA NORTHEAST INC                 
                                                            1.4            15,393                  08/24/11   09/07/11    SISCA NORTHEAST INC                 
                                                            2.1              -780                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.2A              416                  08/24/11   09/07/11    KIRCHHOFF-CONSIGLI                  
                                                            2.6A                0                  04/10/12   08/31/12    KIRCHHOFF-CONSIGLI                  
                                                            2.8            -7,740                  09/11/12   12/19/12    KIRCHHOFF-CONSIGLI                  
                                                            6.1             1,177                  08/24/11   09/07/11    RAY J PANTEL INC                    
                                                            6.2             3,645                  08/24/11   09/07/11    RAY S PANTEL INC                    
 
09-0113   Reconstruction               0-020-005  12/03/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1171   Reconstruction               0-020-006  10/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            000002         -3,484                  07/30/14   08/27/14    Construction Services               
                                                            1.1           -10,525                  06/05/12   10/25/12    CONSTRUCTION SERVICES               
                                                            3.1            12,420                  08/24/11   11/09/11    DJ HEATING & AIR CONDITIONING       
                                                            4.1             2,333                  08/24/11   02/21/12    RONDOUT ELECTRIC                    
                                                            4.2             3,644                  08/24/11   11/09/11    RONDOUT ELECTRIC                    
                                                            4.3             2,700                  08/24/11   11/09/11    RONDOUT ELECTRIC                    
 
13-0696   Reconstruction               0-020-007  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0030   Reconstruction               0-020-008  02/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0254   Reconstruction               0-020-009  11/28/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1          177,295                  10/29/19   10/30/19    J&J SASS ELECTRIC, INC.             
                                                            EC-2           19,455                  10/29/19   11/21/19    J&J SASS ELECTRIC, INC.             
                                                            GC-3          -11,230                  11/12/19   11/22/19    MEYER CONTRACTING CORP.             
                                                            MC-2            2,393                  01/06/21   03/12/21    MDS HVAC-R, INC.                    
                                                            SW001               0                  11/06/19   11/08/19    FIELDTURF USA, INC.                 
                                                            SW002          24,315                  11/06/19   11/08/19    FIELDTURF USA, INC.                 
                                                            SW003          -1,775                  11/06/19   11/08/19    FIELDTURF USA, INC.                 
                                                            SW004           6,851                  11/26/19   12/05/19    FIELDTURF USA, INC.                 
                                                            SW005           5,753                  01/31/20   02/26/20    FIELDTURF USA, INC.                 
 
19-1835   Reconstruction               0-020-010  06/22/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1305   Reconstruction               0-020-011  05/10/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0999   Reconstruction               0-020-012  04/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0373SC Visual Structural Inspection 0-020-SC1  10/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
94-1452   Reconstruction               1-005-001  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0733   Reconstruction               1-005-002  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0887   Reconstruction               1-005-003  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0981   Reconstruction               1-005-004  05/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0697   Reconstruction               1-005-006  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          Materials Storage Shed-Maintenance:
95-0888   New Construction             2-019-001  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Garage:
94-1453   Reconstruction               3-011-001  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0734   Reconstruction               3-011-002  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0889   Reconstruction               3-011-003  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage Facility:
95-1677   New Construction             4-020-001  06/12/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              80,830                  06/14/01   01/10/02    UW Marx, Inc.                       
 
13-0698   Reconstruction               4-020-002  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Maintenance/Storage:
95-1150   Additions and Alterations    5-018-001  06/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0081   Reconstruction               5-018-003  12/03/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00005            -306                  06/05/12   07/16/13    DJ HEATING & AIR CONDITIONING       
                                                            6.4             2,792                  08/24/11   09/07/11    RAY S PANTEL INC                    
 
13-0699   Reconstruction               5-018-005  07/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1000   Additions and Alterations    5-018-006  04/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0700   Reconstruction               5-018-L01  06/11/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box:
04-1459   New Construction             7-023-001  09/02/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          BEACON HIGH SCHOOL PRESS BOX:
18-0255   New Construction             7-024-001  11/28/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
20-0341   Reconstruction               7-999-002  11/23/20  NO CHANGE ORDERS ON ELECTRONIC FILE

DOVER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-05-02-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Dover Middle/High School:
91-1598   Reconstruction               0-001-004  07/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0688   Additions and Alterations    0-001-005  05/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0010   Reconstruction               0-001-006  07/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1173   Reconstruction               0-001-007  05/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-02        -1,000                  07/16/02   07/23/02    Dutchess Mech.                      
 
02-2450   Reconstruction               0-001-008  08/29/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,125                  09/02/04   09/07/04    American Petroleum Equipment Const  
 
05-0181   Reconstruction               0-001-009  01/30/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1277   Reconstruction               0-001-010  02/15/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -77,617                  08/22/08   05/11/09    C. B. STRAIN & SONS, INC.           
                                                            1              57,047                  10/14/08   04/14/09    FASTRACS RENTRALS, INC.             
 
06-1084   Reconstruction               0-001-011  03/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1529   Reconstruction               0-001-012  04/18/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1153   Reconstruction               0-001-013  04/30/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            #1             48,683                  08/20/10   09/13/10    EVERFOAM INSULATION SYSTEMS INC     
 
09-1469   Reconstruction               0-001-014  08/04/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0070   Reconstruction               0-001-015  04/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0667   Reconstruction               0-001-016  06/02/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1111   Reconstruction               0-001-017  05/08/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0618   Reconstruction               0-001-018  10/31/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0451   Reconstruction               0-001-019  05/13/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1328   Reconstruction               0-001-020  03/25/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1386   Reconstruction               0-001-022  06/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1047   Reconstruction               0-001-023  04/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1048   Reconstruction               0-001-024  01/05/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0471   Reconstruction               0-001-025  12/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1477FP Reconstruction               0-001-FP1  05/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wingdale Elementary:
93-1712   Reconstruction               0-003-002  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1172   Reconstruction               0-003-003  05/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2                 265                  12/20/01     /  /      Arris Contracting                   
                                                            EC-04             438                  10/31/01   01/08/02    Canale Elec.                        
                                                            FC-01           2,250                  11/27/01   01/08/02    J. Herbert                          
                                                            FC-02           5,200                  11/27/01   01/08/02    J. Herbert                          
                                                            GC-05             264                  12/20/01   03/21/02    Arris Contracting                   
                                                            HVAC-03        13,831                  10/22/02   10/28/02    Dutchess Mech.                      
                                                            SC-10          -4,100                  12/20/01   03/21/02    Sun Up Ent.                         
                                                            SC-11          -3,532                  10/22/02   10/28/02    Sun Up Ent.                         
 
07-1530   Reconstruction               0-003-004  04/18/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,317                  03/23/11   04/22/11    FOREMOST DEVELOPMENT LLC            
 
08-0601   Reconstruction               0-003-005  02/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1764   Reconstruction               0-003-006  07/22/09  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0641   Reconstruction               0-003-007  04/17/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0343   Reconstruction               0-003-008  03/12/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0071   Reconstruction               0-003-009  04/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1545   Reconstruction               0-003-010  07/18/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0065   Reconstruction               0-003-011  08/16/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1387   Reconstruction               0-003-012  06/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1478FP Reconstruction               0-003-FP1  05/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dover Elementary School:
95-0689   Additions and Alterations    0-004-006  05/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1575   Reconstruction               0-004-007  07/15/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,137                  12/20/04   12/29/04    American Petroleum                  
 
06-0543   Reconstruction               0-004-008  06/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            #2            -11,107                  08/02/10   09/22/10    J.C. MILLBANK CONSTRUCTION CO INC   
 
13-0072   Reconstruction               0-004-009  04/02/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0568   Reconstruction               0-004-010  03/11/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0453   Reconstruction               0-004-011  04/13/18  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0114   Reconstruction               0-004-012  08/29/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1388   Reconstruction               0-004-013  06/28/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Storage Building:
08-1419   New Construction             2-011-001  06/10/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School Garage:
95-0690   Additions and Alterations    4-005-001  05/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXSewage Treatment Bldg. (see 7-007):
12-1322   New Construction             4-007-001  09/12/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,876                  07/07/14   07/15/14    OSTERHOUDT ELECTRIC INC             
                                                            2               3,535                  07/07/14   07/15/14    SUN UP ENTREPRISES INC              
                                                            3             -10,789                  07/07/14   07/15/14    THE FORT MILLER CO INC              
 

          Press Box / Bleachers:
05-1278   New Construction             7-009-001  02/15/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -1,000                  10/14/08   04/14/09    DANT CLAYTON CORP.                  
 

          Concession Stand @ MS/HS:
05-1279   New Construction             7-010-001  02/15/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
15-1173   Reconstruction               7-999-001  07/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE

HYDE PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-08-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Haviland Middle School(JrHigh):
90-0715   Reconstruction               0-001-003  01/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0392   Reconstruction               0-001-004  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0369   Reconstruction               0-001-005  11/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0586   Reconstruction               0-001-006  02/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1579   Reconstruction               0-001-008  06/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1698   Reconstruction               0-001-009  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1220   Reconstruction               0-001-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0169   Reconstruction               0-001-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1741   Reconstruction               0-001-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1484   Reconstruction               0-001-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1125   Reconstruction               0-001-014  01/31/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -13,500                  07/02/07   07/17/07    Ashley Mechanical                   
                                                            00001           4,903                  07/02/07   07/17/07    JC Millbank Construction            
                                                            00002           4,000                  07/02/07   07/17/07    JC Millbank Construction            
                                                            00003          13,977                  07/02/07   07/17/07    JC Millbank Construction            
                                                            00003           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00004           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00011          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00012          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00016          17,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00017           3,120                  07/02/07   07/17/07    Suburban Restoration                
                                                            00020           6,600                  07/02/07   07/17/07    Suburban Restoration                
 
04-1244   Reconstruction               0-001-016  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003           3,062                  05/04/06   03/15/07    Dutchess mechancial                 
                                                            00004          16,240                  01/26/06   08/21/06    NAC Industries                      
                                                            0002            6,125                  05/04/06   03/15/07    Dutchess Mechanical                 
                                                            EC-02           3,265                  01/26/07   03/14/07    Pantel Contracting                  
                                                            SC-05           3,300                  11/03/06   12/28/06    NAC Industries                      
 
05-0017   Reconstruction               0-001-017  08/23/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01           8,800                  02/05/07   03/09/07    Best Roofing of New Jersey          
 
05-0468   Reconstruction               0-001-018  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003          -3,630                  01/29/08   03/19/08    meyer contracting                   
                                                            1A-01          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            1A-02          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            1A-03          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            1A-04          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            2-05            4,448                  11/02/06   12/18/06    William Manfredi Construction       
                                                            EC2-01          8,701                  09/12/06   10/30/06    Canale Electric                     
                                                            EC2-04            540                  01/31/07     /  /      Canale Electric                     
                                                            EC2-05          2,211                  01/31/07   02/22/07    Canale Electric                     
                                                            EC2-06          8,265                  01/31/07   02/22/07    Canale Electric                     
                                                            EC2-07          8,190                  01/31/07   02/22/07    Canale Electric                     
                                                            EC2-09         -4,350                  03/12/07   04/06/07    Canale Electric                     
                                                            EC2-10         17,680                  06/11/07   08/01/07    Canale electric                     
                                                            G2-04           3,128                  09/21/06   10/30/06    William Manfredi Construction       
                                                            GC-2-08         4,725                  12/05/07   01/07/08    WILLIAM MANFREDI,SR                 
                                                            GC2-02         31,640                  09/12/06   10/30/06    William Fredi                       
                                                            GC2-07           -380                  01/16/07   02/09/07    William Mandredi                    
                                                            HC-02           4,505                  09/21/06   01/09/07    General Mechanical Systems          
                                                            HC-03          26,958                  12/21/06   01/12/07    General Mechanical                  
                                                            HC-04           1,798                  12/05/07   01/07/08    GENERAL MECHANICAL SYSTEMS,INC      
                                                            Pc1-06            483                  01/16/07   01/24/07    General Mechanical                  
                                                            Sc-10           1,505                  01/16/07   02/09/07    Ben Ciccone Inc                     
 
07-2297   Reconstruction               0-001-019  11/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0735   Reconstruction               0-001-020  03/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RS-1-1        -44,510                  01/20/12   04/06/12    HUDSON VALLEY ROOFING & SHEET METAL 
                                                            RS-1-2         -2,410                  01/20/12   04/06/12    HUDSON VALLEY ROOFING & SHEET METAL 
                                                            RS-3-1        -37,855                  01/14/13   04/03/13    PRECISION ROOFING INC               
                                                            WC-1          -50,000                  01/20/12   04/06/12    LIPSKY ENTERPRISES INC              
 
09-1341   Reconstruction               0-001-021  06/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC2-1          -5,000                  11/15/10   11/17/10    COUNTRY CARPET DISTRIBUTORS INC     
 
10-0805   Reconstruction               0-001-022  05/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-1          -10,000                  01/05/12   07/16/12    J & J Sass Electric, Inc.           
                                                            SC-1           62,379                  11/04/11   01/24/12    ROEHRS CONSTRUCTION INC             
 
10-1035   Reconstruction               0-001-023  04/01/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-1          -11,272                  04/25/12   09/07/12    ENVIRO CLEAN SERVICES               
 
11-0962   Reconstruction               0-001-024  07/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-B-1        -12,667                  01/06/14   02/04/14    Ashley Mechanical, Inc.             
                                                            HC-B-2        -52,504                  04/11/14   05/06/14    Ashley Mechanical, Inc.             
 
12-1056   Reconstruction               0-001-025  04/29/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-1           11,781                  11/20/13   03/04/14    Ashley Mechancial, Inc.             
                                                            HC-2           31,977                  11/20/13   03/04/14    ASHLEY MECHANICAL, INC              
                                                            HC-3           -9,717                  06/04/14   06/18/14    Ashley Mechanical, Inc.             
 
14-0577   Reconstruction               0-001-026  05/13/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CW-01          -3,775                  07/17/17   10/31/17    Trane US, Inc.                      
                                                            EC-01          -6,523                  06/05/17   11/13/17    Sausto Contracting, Inc.            
                                                            HC-03          11,665                  05/12/17   06/06/17    S&O Construction Services, Inc.     
                                                            HC-1            6,345                  10/05/16     /  /      S&O Construction Services, Inc.     
                                                            HC-4          -48,311                  06/05/17   11/13/17    S & O Construction Services, Inc.   
 
14-0454   Reconstruction               0-001-027  11/05/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-1          -15,000                  05/14/15   05/21/15    S & O Construction Services Inc.    
 
14-0690   Reconstruction               0-001-028  01/14/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -13,381                  05/11/16   05/31/16    KEY CONSTRUCTION                    
 
18-1587   Reconstruction               0-001-029  08/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-001         -2,078                  09/30/20   11/27/20    J&J SASS ELECTRIC, INC.             
                                                            03-002         10,348                  01/04/21   02/25/21    J&J SASS ELECTRIC, INC.             
                                                            03-003         20,214                  01/04/21   02/25/21    J&J SASS ELECTRIC, INC.             
                                                            03-004         19,369                  01/04/21   02/25/21    J&J SASS ELECTRIC, INC.             
                                                            03-005         26,493                  04/21/21   08/04/21    J&J SASS ELECTRIC, INC.             
                                                            04-001          7,136                  04/21/21   08/04/21    S&O CONSTRUCTION SERVICES, INC.     
                                                            04-002         -3,863                  04/21/21   08/04/21    S&O CONSTRUCTION SERVICES, INC.     
                                                            05-001          9,500                  09/30/20   02/09/21    NEOPLANTA RESTORATION, INC.         
                                                            05-002         15,067                  02/08/21   03/31/21    NEOPLANTA RESTORATION, INC.         
                                                            05-003         21,979                  02/08/21   03/31/21    NEOPLANTA RESTORATION, INC.         
                                                            AA-MC-02            0                  11/24/21   12/15/22    S&O Const Sertvices Inc             
                                                            ADEC-001            0                  01/13/21   03/16/21    JJ SASS ELECTRIC, INC.              
                                                            ADEC-002            0                  01/13/21   03/16/21    JJ SASS ELECTRIC, INC.              
                                                            ADGC-001            0                  01/13/21   06/10/21    IRON SWORD ENTERPRISES, LLC         
                                                            ADGC-002            0                  03/11/21   06/29/21    IRON SWORD ENTERPRISES, LLC         
                                                            ADGC-04             0                  03/02/22   04/06/23    Iron Sword Entrps LLC               
                                                            ADGC-05             0                  03/02/22   04/06/23    Iron Sword Entrps                   
                                                            ADGC-06             0                  03/02/22   04/06/23    Iron Sword Enrpts LLC               
                                                            ADGC-07             0                  03/02/22   04/06/23    Iron Sword Entrps LLC               
                                                            ADPC-001            0                  01/13/21   03/16/21    S&O CONSTRUCTION SERVICES, INC.     
                                                            CO-06-01      -13,962                  08/11/21   04/19/22    TRANE                               
                                                            EC-003          2,769                  11/10/21   12/12/22    JJ Sass Electric, Inc               
                                                            EC-004            715                  11/10/21   12/12/22    JJ Sass Electric, Inc               
                                                            GC-003          1,584                  11/10/21   12/14/22    Iron Sword Enterprises LLC          
                                                            HMS-06-2        1,835                  12/02/21   12/16/22    Trane                               
                                                            HMS01-01        5,219                  12/20/21   12/27/22    Iron Sword Entrps LLC               
                                                            HMS01-02        3,353                  12/20/21   12/27/22    Iron Sword Entrps LLC               
                                                            MC-001         36,096                  11/10/21   12/12/22    S&O Const Services, Inc             
                                                            MS-03-06       -9,072                  11/24/21   12/15/22    J&j Sass Electric, Inc              
                                                            MS-06-01      -13,962                  11/10/21   12/14/22    Trane                               
 
18-1691   Reconstruction               0-001-030  05/08/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0080   Reconstruction               0-001-031  10/26/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2155   Reconstruction               0-001-032  10/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0649FP Reconstruction               0-001-FP1  12/18/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roosevelt High School:
93-0393   Reconstruction               0-002-005  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0384   Reconstruction               0-002-006  12/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0013   Reconstruction               0-002-009  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1221   Reconstruction               0-002-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0170   Reconstruction               0-002-011  03/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             44,150                  08/03/04   08/29/08    A. Colarusso & Son,Inc              
                                                            02             28,500                  12/01/04   08/29/08    A.Colarusso & Son,Inc               
 
00-1742   Reconstruction               0-002-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1485   Reconstruction               0-002-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1245   Reconstruction               0-002-015  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           3,086                  11/03/06   12/28/06    Pantel Contracting                  
 
05-0469   Reconstruction               0-002-016  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004          -2,200                  01/29/08   03/19/08    meyer contracting                   
                                                            00005          -6,960                  01/29/08   04/02/08    meyer contracting                   
                                                            00007            -200                  01/29/08   04/02/08    meyer contracting                   
                                                            EC-4           38,720                  02/21/13   05/08/13    FOREMOST ELECTRIC CORP              
                                                            EC3-02         15,770                  09/12/06   01/09/07    Canale ELectric                     
                                                            EC3-03          2,206                  09/12/06   12/18/06    Canale electric                     
                                                            EC3-06          9,363                  01/31/07   02/22/07    Canale Electric                     
                                                            GC3-02          4,938                  09/12/06   10/30/06    William manfredi Construction       
                                                            GC3-07          9,294                  06/11/07   06/20/07    William manfredi Construction       
                                                            Gc3-06           -240                  01/16/07   02/09/07    William Manfredi                    
                                                            HC-01           1,142                  09/12/06   12/18/06    General mechanical Systems          
                                                            Pc1-07          1,966                  01/16/07   01/24/07    General Mechanical                  
                                                            SC-07           6,363                  10/18/06   12/18/06    Ben Ciccone                         
                                                            SC-08             820                  10/18/06   12/18/06    Ben Ciccone                         
 
05-0254   Reconstruction               0-002-017  10/11/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2298   Reconstruction               0-002-018  11/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2316   Reconstruction               0-002-019  08/26/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SEC-1         -20,000                  02/17/12   06/12/12    S3 INTEGRATION LLC                  
 
09-0172   Reconstruction               0-002-020  08/31/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2           -4,500                  01/20/12   07/16/12    DAVID FRIEDLANDER                   
 
09-1342   Reconstruction               0-002-021  06/01/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0874   Reconstruction               0-002-022  04/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1-1         73,333                  10/09/12   02/19/13    COUNTRY CARPET DISTRIBUTORS INC     
                                                            GC-1-2        -20,000                  10/09/12   02/19/13    COUNTRY CARPET DISTRIBUTORS INC     
                                                            GC-1-3           -376                  08/21/13   11/25/13    Country Carpet Distrubitors, Inc.   
                                                            GC-2-1        -10,000                  08/21/13   11/25/13    Country Carpet Distributors, Inc.   
                                                            HM-1-1        -71,312                  08/23/12   12/10/12    NIRAM INC                           
 
11-0963   Reconstruction               0-002-023  07/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-A-1        -50,907                  06/05/14   09/02/14    Mengler Mechanical, Inc.            
 
12-0013   Reconstruction               0-002-024  11/14/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            BC-1          -10,000                  07/17/14   11/06/14    Southern Bleacher Company, Inc.     
                                                            EC-1           42,000                  09/27/13   03/07/14    Hudson Valley Electrical Constructio
                                                            EC-1            4,200                  11/22/13   07/10/14    Hudson Valley Electrical Constructio
                                                            EC-2             -425                  02/10/14   03/21/14    Hudson Valley Electrical            
                                                            EQ-1           -1,392                  01/06/14   01/31/14    Facilities Equipment and Service    
                                                            EQ-2           -5,000                  04/14/14   07/03/14    FACILITIES EQUIPMENT AND SERVICE INC
                                                            GC-1            9,660                  10/10/13   12/09/13    LANDSCAPE UNLIMITED INC             
                                                            GC-2            9,000                  03/10/14   05/30/14    Landscape Unlimited, Inc.           
                                                            GC-3           -2,500                  04/14/14   05/02/14    Landscape Unlimited, Inc.           
 
16-1331   Reconstruction               0-002-026  03/18/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1588   Alterations                  0-002-027  08/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001        -70,140                  12/20/21   12/27/22    OCS Industries Inc                  
                                                            01-002          3,357                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-003          1,219                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-004          3,038                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-005          2,674                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-006          2,470                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-007          9,653                  07/06/23     /  /      OCS INDUSRIES                       
                                                            01-008         36,111                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-009         19,959                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-010         22,500                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-011         -7,029                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-012         21,126                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            01-013         -1,548                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            02-01           2,202                  05/02/22   02/28/23    S&O Const Servs Inc                 
                                                            02-02           5,300                  06/09/22   04/04/23    S&O Const Servs Inc                 
                                                            03-002          4,149                  11/24/21   12/15/22    Mehl Electric Comp Inc              
                                                            03-006         18,024                  05/02/22   02/28/23    Mehl Elec Comp Inc                  
                                                            03-007         84,864                  05/02/22   02/28/23    Mehl Elec Comp Inc                  
                                                            03-008          1,486                  05/02/22   02/28/23    Mehl Elec Comp Inc                  
                                                            03-010         10,147                  11/16/22   07/25/23    MEHL ELECTRIC COMPANY INC           
                                                            03-011         -2,369                  09/16/22   10/31/23    Mehl Elec Comp Inc                  
                                                            03-011         -2,369                  07/06/23     /  /      MEHL ELECTRIC COMPANY               
                                                            03-012          1,243                  09/16/22   10/31/23    Mehl Elec Comp Inc                  
                                                            03-012          1,243                  07/06/23     /  /      mehl electric company               
                                                            03-013        -15,496                  07/06/23   12/28/23    MEHL ELECTRIC COMPANY               
                                                            03-014          7,251                  07/06/23   12/28/23    MEHL ELECTRIC COMPANY               
                                                            03-015          1,151                  07/06/23   12/28/23    MEHL ELECTRIC COMPANY               
                                                            03-016          8,116                  07/06/23   12/28/23    MEHL ELECTRIC COMOANY               
                                                            03-017          1,502                  07/06/23     /  /      MEHL ELECTRIC COMPANY               
                                                            04-004          2,099                  03/28/22   04/04/23    S&L Plumb&Heat Corp                 
                                                            04-006          1,637                  09/16/22     /  /      S&L Plumb&Heat Corp                 
                                                            04-007          2,357                  09/16/22   10/31/23    S&L Plumb&Heat Corp                 
                                                            04-011          1,086                  07/06/23   12/28/23    S&L PLUMBING AND HEATING CORP       
                                                            04-012          3,660                  07/06/23     /  /      S&L PLUMBING AND HEATING            
                                                            04-013          4,598                  07/06/23   12/28/23    S&L PLUMBING AND HEATING            
                                                            04-014         -2,674                  07/06/23   12/28/23    S&L PLUMBING AND HEATING CORP       
                                                            04-015         -2,470                  07/06/23   12/28/23    S&L PLUMBING AND HEATING CORP       
                                                            04-02           8,164                  02/17/22   03/28/23    S&L Plub&Heat Corp                  
                                                            04-03           4,828                  02/17/22   03/28/23    S&L Plumb&Heat Corp                 
                                                            05-001        263,956                  12/20/21   12/27/22    United Saftey                       
                                                            05-002         31,675                  07/06/23     /  /      UNITED SAFETY                       
                                                            06-002          3,167                  12/02/21   12/16/22    Trane                               
                                                            06-002          3,167                  07/06/23   12/28/23    TRANE                               
                                                            06-003          6,715                  09/16/22   11/13/23    Trane                               
                                                            ADPC-002            0                  02/17/22   03/28/23    S&L Plumb&Heat Corp                 
                                                            ADPC-03             0                  02/17/22   03/28/23    S&L Plumb&Heat Corp                 
                                                            C0-06-01       43,450                  08/11/21   04/19/22    TRANE                               
                                                            CO-04-01        3,238                  08/11/21   04/19/22    S&L PLUMB & HEAT CORP.              
                                                            CO-4-008        5,072                  03/16/23   12/19/23    S&L PLUMBING AND HEATING CORP       
                                                            CO-4-009        2,144                  03/16/23   12/19/23    S&L PLUMBING AND HEATING CORP       
                                                            CO-4-010        6,740                  03/16/23   12/19/23    S&L PLUMBING AND HEATING CORP.      
                                                            EC-001         19,758                  11/10/21   12/12/22    MEHL Electric Comp, Inc             
                                                            EC-001         22,871                  11/24/21   12/15/22    Mehl Electric Comp Inc              
                                                            EC-002AA            0                  11/24/21   12/15/22    Mehl Electric Comp Inc              
                                                            EC-003        -21,878                  11/24/21   12/15/22    Mehl Electric Comp Inc              
                                                            EC-004            490                  03/23/22   04/04/23    Mehl Elec Comp Inc                  
                                                            EC-005          1,864                  03/23/22   04/04/23    Mehl Elec Comp Comp Inc             
                                                            EC-03-09       14,645                  06/09/22   04/04/23    Mehl Elec Comp Inc                  
                                                            FDR4-05         2,571                  04/13/22   03/08/23    S&L Plumb&heat Corp                 
                                                            GC-001        -15,000                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-002         -4,747                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-003         -1,827                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-004         -6,173                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-005         -3,575                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-006         -6,612                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-007         -3,345                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-008         -2,836                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-009           -557                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-010         -3,497                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-011         -1,141                  07/06/23   01/03/24    OCS INDUSTRIES                      
                                                            GC-012           -488                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-013         -1,291                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-014           -595                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-016         -1,760                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-017           -579                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-018           -482                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-019           -908                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-021         -1,572                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            GC-022        -10,415                  07/06/23     /  /      OCS INDUSTRIES                      
                                                            MC-001         -3,726                  07/06/23     /  /      S&O CONSTRUCTION SERVICES           
                                                            MC-002         -2,493                  07/06/23   01/03/24    S&O CONSTRUCTION SERVICES           
                                                            MC-003          5,642                  06/09/22   04/04/23    S&O Const Servs Inc                 
                                                            MC-003         -9,401                  07/06/23   01/03/24    S&O CONSTRUCTION SERVICES           
                                                            MC-004        -34,379                  07/06/23   01/03/24    S&O CONSTRUCTION SERVICES           
                                                            MC-06-01       43,450                  11/10/21   12/12/22    Trane                               
                                                            MC02-04         7,868                  06/09/22   04/04/23    S&O Const Servs Inc                 
                                                            PC-001          2,511                  11/10/21   12/12/22    S&L Plumb&Heat Corp                 
                                                            PC-004              0                  03/16/23   12/28/23    S&L PLUMBING AND HEATING CORP       
                                                            PC-004         -2,889                  07/06/23   12/19/23    S&L PLUMBING AND HEATING CORP       
                                                            PC-005              0                  03/23/23     /  /      S&L PLUMBING AND HEATING CORP       
                                                            PC-005         -1,333                  07/06/23   12/19/23    S&L PLUMBING & HEATING              
                                                            PC-04-01        3,238                  11/10/21   12/12/22    S&L Plumbing &Heat Corp             
 
19-1761   Reconstruction               0-002-028  06/16/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AD-003              0                  09/16/22     /  /      Garent Tech Solutions Inc           
                                                            TC-001AA            0                  11/24/21   12/15/22    Garnet Tech Solutions, Inc          
                                                            TC-002              0                  09/16/22   11/13/23    Garnet Tech Solutions Inc           
                                                            TC-004              0                  03/16/23   12/19/23    GARNET TECHNOLOGY SOLUTIONS         
                                                            TC-005              0                  03/16/23   12/19/23    GARNET TECHNOLOGY SOLUTIONS         
 
21-0802   Reconstruction               0-002-030  02/28/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SW01-01             0                  06/02/22   05/15/23    OCS Inds Inc                        
 
22-0434   Reconstruction               0-002-031  04/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0650FP Reconstruction               0-002-FP1  12/18/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ralph R. Smith Elementary:
91-0784   Reconstruction               0-003-003  02/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0394   Reconstruction               0-003-004  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0440   Reconstruction               0-003-005  12/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0543   Reconstruction               0-003-006  01/31/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1715   Reconstruction               0-003-008  07/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1699   Reconstruction               0-003-009  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1222   Reconstruction               0-003-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0171   Reconstruction               0-003-011  03/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              7,750                  07/28/03   08/29/08    J.D Parrella Electric,Inc           
 
00-1486   Reconstruction               0-003-012  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1246   Reconstruction               0-003-014  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -3,987                  05/04/06   06/02/06    Ashley Mechanical                   
                                                            0004            3,062                  05/04/06   11/22/06    Dutchess mechanical                 
                                                            SC-06           2,500                  11/03/06   01/09/07    NAC Industries                      
 
05-0470   Reconstruction               0-003-015  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001             120                  01/29/08   04/02/08    meyer contracting                   
                                                            00003          -7,725                  01/29/08   03/07/08    S & O construction                  
                                                            00004          15,778                  01/29/08     /  /      S & O construction                  
                                                            00005          20,000                  01/29/08     /  /      wayne l kurlander                   
                                                            00005         -20,000                  01/29/08   03/07/08    S & O CONSTRUCTION SERVICES         
                                                            00006         -15,109                  02/20/08   03/06/08    S&O construction                    
                                                            00006            -700                  01/29/08   04/02/08    meyer contracting                   
                                                            00008            -626                  02/04/08   03/08/08    CANALE ELECTRIC CORP.ctirc          
                                                            0009           -2,111                  01/18/08   01/28/08    CANALE ELECTRIC CORP                
                                                            3-04           -3,000                  10/10/06   12/18/06    William Manfredi                    
                                                            3-05            4,171                  11/02/06   12/18/06    William Manfredi                    
                                                            EC-2           18,900                  02/21/13   05/08/13    FOREMOST ELECTRIC CORP              
                                                            EC-3-08          -627                  01/07/08   01/09/08    Canale Electric Corp                
                                                            EC3-01        -12,344                  09/12/06   01/19/07    Canale Electric                     
                                                            EC3-04          2,403                  09/21/06     /  /      Canale Electric                     
                                                            EC3-05          1,105                  01/31/07   02/22/07    Canale Electric                     
                                                            EC3-07          2,581                  01/31/07   11/14/12    Canale Electric                     
                                                            GC3-01       -126,551                  09/12/06   10/30/06    William manfredi Construction       
                                                            Gc3-03            978                  09/21/06   10/30/06    William Mechanical                  
                                                            PC-1-03        17,312                  12/21/06   01/18/12    General mechanical                  
                                                            PC-1-09         2,000                  02/04/08   03/08/08    GENERAL MECHANICAL SYSTEMS, INC.    
 
07-2299   Reconstruction               0-003-016  11/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0736   Reconstruction               0-003-017  03/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RS-3-1        -37,855                  09/12/16   10/25/16    Precision Roofing, Inc.             
 
10-0875   Reconstruction               0-003-018  04/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HM-2-2         -1,085                  01/15/13   04/05/13    NIRAM INC                           
                                                            HM-2-3         -4,242                  01/15/13   04/05/13    NIRAM INC                           
                                                            HM-2-4         -5,256                  01/15/13   04/05/13    NIRAM INC                           
 
10-1036   Reconstruction               0-003-019  04/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0964   Reconstruction               0-003-020  07/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2156   Reconstruction               0-003-021  10/02/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Violet Avenue Elementary:
92-0383   Reconstruction               0-004-004  11/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0395   Reconstruction               0-004-005  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1700   Reconstruction               0-004-007  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1223   Reconstruction               0-004-008  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1743   Reconstruction               0-004-009  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1487   Reconstruction               0-004-010  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0172   Reconstruction               0-004-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0444   Reconstruction               0-004-012  03/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -13,500                  06/19/07   10/26/07    Ashley mechanical                   
                                                            00002           8,165                  06/19/07     /  /      Ashley Mechanical                   
                                                            00002           8,165                  07/02/07   10/28/07    Ashley Mechanical                   
                                                            00003          -4,530                  06/19/07     /  /      Ashley Mechanical                   
                                                            00003          -4,530                  07/02/07   10/29/07    Ashley Mechanical                   
                                                            00005           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00006           5,312                  07/02/07   07/17/07    Suburban Restoration Co             
                                                            00007           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00008           5,312                  07/02/07   07/17/07    Suburban restoration                
                                                            00010           6,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00013          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00014          12,000                  07/02/07   07/17/07    Suburban Restoration Co             
                                                            00015          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00018          11,637                  07/02/07   07/17/07    Suburban Restoration                
                                                            00019          19,800                  07/02/07   07/17/07    Suburban Restoration Co             
 
04-1247   Reconstruction               0-004-013  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0471   Reconstruction               0-004-014  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00011            -186                  02/04/08   03/08/08    CANALE ELECTRIC CORP.               
                                                            2-06             -565                  11/02/06   12/18/06    William Manfredi                    
                                                            EC-1           13,645                  02/21/13   05/08/13    FOREMOST ELECTRIC CORP              
                                                            EC-2-11             0                  01/07/08   01/09/08    Canale Electric Corp.               
                                                            EC2-02          6,809                  09/12/06   01/09/07    Canale Electric                     
                                                            EC2-03           -398                  09/12/06   12/18/06    Canale Electric                     
                                                            EC2-08          5,915                  01/31/07   02/22/07    Canale Electric                     
                                                            GC2-01        -19,303                  09/12/06   10/30/06    William manfredi                    
                                                            GC2-03         -6,106                  09/12/06   10/30/06    William manfredi Construction       
                                                            PC1-01           -724                  09/12/06   12/18/06    General Mechanical Systems          
                                                            SC-04          -1,156                  09/21/06   10/30/06    Ben Ciccone Inc                     
 
07-2300   Reconstruction               0-004-015  11/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0737   Reconstruction               0-004-016  03/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-1            -3,270                  01/20/12   04/06/12    ROEHRE CONSTRUCTION INC             
 
09-1343   Reconstruction               0-004-017  06/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HM2-2REV        4,000                  10/17/11   12/12/11    SIGNING STAR LLC                    
 
11-0965   Reconstruction               0-004-018  07/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-C-1          1,371                  07/18/14   08/29/14    S & O Construction Services, Inc.   
 
22-2157   Reconstruction               0-004-019  10/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hyde Park Elementary:
90-1330   Reconstruction               0-005-005  05/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0785   Reconstruction               0-005-006  02/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1489   Reconstruction               0-005-007  07/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0396   Reconstruction               0-005-008  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0014   Reconstruction               0-005-010  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1224   Reconstruction               0-005-011  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1744   Reconstruction               0-005-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1162   Reconstruction               0-005-013  03/16/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1488   Reconstruction               0-005-014  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0173   Reconstruction               0-005-015  03/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             14,000                  07/28/03   08/29/08    J.D Parrella Electric,Inc           
 
04-0445   Reconstruction               0-005-016  03/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           5,312                  07/02/07   07/17/07    suburban Restoration                
                                                            00002           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00009          16,500                  07/02/07   07/17/07    Suburban Restoration                
 
04-0737   Reconstruction               0-005-017  02/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -3,000                  05/04/06   05/24/06    Arris Contracting Co                
 
04-1248   Reconstruction               0-005-018  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0472   Reconstruction               0-005-019  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002             563                  01/29/08   04/02/08    meyer contracting                   
                                                            1-03           55,000                  10/10/06   12/18/06    Cali Brothers                       
                                                            1-04            5,964                  12/21/06   01/12/07    General Mechanical                  
                                                            1-05            7,592                  12/21/06   01/12/07    General mechanical                  
                                                            1-06            5,020                  10/10/06   12/18/06    Cali Brothers                       
                                                            EC-1            1,593                  12/05/07   01/07/08    PANTEL CONTRACTING CORP             
                                                            EC-3           18,198                  02/21/13   05/08/13    FOREMOST ELECTRIC CORP              
                                                            EC1-04         28,979                  01/31/07   02/22/07    Pantel Contracting                  
                                                            EC1-05         21,288                  01/31/07   02/22/07    Pantel Contracting                  
                                                            GC1-02          3,970                  01/16/07   02/09/07    Cali Brothers                       
                                                            GC1-04          2,845                  01/16/07   02/09/07    Cali Brothers                       
                                                            GC1-05          3,410                  01/16/07   02/09/07    Cali Brothers                       
                                                            GC1-11           -578                  01/16/06   02/09/07    Cali Brothers                       
                                                            PC1-02         10,700                  11/02/06   01/18/12    General mechanical                  
                                                            SC-02           2,969                  09/21/06   10/30/06    Ben Ciccone                         
                                                            SC-05           8,890                  09/21/06   10/30/06    Ben Ciccone                         
                                                            SC-06           8,461                  09/21/06   10/30/06    Ben Ciccone                         
 
07-2301   Reconstruction               0-005-020  11/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0738   Reconstruction               0-005-021  03/12/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -5,000                  10/17/11   12/20/11    KEY INTERIOR ACOUSTICAL LLC         
                                                            GC-1            1,182                  01/20/12   04/06/12    MEYER CONTRACTING CORP              
                                                            RC-1          -10,000                  10/26/11   01/24/12    MARFI CONTRACTING CORP              
 
09-1344   Reconstruction               0-005-022  06/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HM2-1           4,000                  10/17/11   12/12/11    SIGNING STAR LLC                    
 
11-0966   Reconstruction               0-005-023  07/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           -5,000                  06/05/14   09/02/14    J & H Sass Electric, Inc.           
                                                            HC-C-2          1,371                  07/18/14   08/29/14    S & O Contracting Services, Inc.    
 
22-0435   Reconstruction               0-005-024  04/12/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Netherwood Elementary School:
93-0397   Reconstruction               0-007-004  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0015   Reconstruction               0-007-006  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0102   Reconstruction               0-007-007  07/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0741   Reconstruction               0-007-008  02/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1716   Reconstruction               0-007-009  07/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1701   Reconstruction               0-007-010  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1225   Reconstruction               0-007-011  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0174   Reconstruction               0-007-012  03/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01              1,000                  07/28/03   08/29/08    J.D Parrella Electric,Inc           
 
00-1489   Reconstruction               0-007-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1249   Reconstruction               0-007-014  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0473   Reconstruction               0-007-015  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-07           21,890                  10/10/06   12/18/06    Cali Brothers                       
                                                            EC-1         -154,690                  11/02/06   12/18/06    Pantel Contracting                  
                                                            EC1-03         41,021                  12/21/06   01/30/07    Pantel Contracting                  
                                                            EC1-06         -1,598                  01/31/07   02/22/07    Pantel Contracting                  
                                                            GC1-01       -129,600                  09/12/06   10/30/06    Cali Brothers                       
                                                            GC1-09           -528                  01/16/07   02/09/07    Cali Brothers                       
                                                            Gc1-15            925                  01/16/07   02/09/07    Cali brothers                       
                                                            PC-2-02        13,200                  10/10/06   10/19/06    CB Strain sons                      
                                                            PC-2-03        -7,138                  12/05/07   01/07/08    C.B STRAIN & SONS,INC               
                                                            PC1-08          2,115                  01/16/07   01/24/07    General Mechanical Systems          
                                                            PC2-01         -6,000                  09/12/06   10/30/06    Cb Strain and Sons                  
                                                            SC-01         -10,845                  09/12/06   10/30/06    Ben Ciccone                         
                                                            SC-03           2,721                  09/21/06   10/30/06    Ben Ciccone Inc                     
                                                            SC-09           3,183                  10/18/06   12/18/06    Ben Ciccone                         
                                                            SC-13          34,864                  01/16/07   03/13/07    Ben Ciccone Inc                     
                                                            SC-14          39,868                  01/16/07   03/13/07    Ben Ciccone Inc                     
                                                            Sc-11           4,105                  01/16/07   02/09/07    Ben Ciccone                         
                                                            Sc-12           3,181                  01/16/07   02/09/07    Ben Ciccone                         
 
07-2302   Reconstruction               0-007-016  11/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0739   Reconstruction               0-007-017  03/12/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0876   Reconstruction               0-007-018  04/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HM-2-1         -1,527                  01/15/13   04/05/13    NIRAM INC                           
 
10-1037   Reconstruction               0-007-019  04/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0648FP Reconstruction               0-007-FP1  12/18/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Park Elementary School:
91-0886   Reconstruction               0-013-004  03/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0398   Reconstruction               0-013-005  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1580   Reconstruction               0-013-007  06/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0016   Reconstruction               0-013-008  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1226   Reconstruction               0-013-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0175   Reconstruction               0-013-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1745   Reconstruction               0-013-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1490   Reconstruction               0-013-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1250   Reconstruction               0-013-015  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-08                0                  10/10/06   12/18/06    Cali Brothers Inc                   
 
05-0474   Reconstruction               0-013-016  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1-02        11,070                  11/02/06   12/18/06    Pantel Contracting                  
                                                            GC 1-08        17,440                  10/10/06   12/18/06    CALI BROTHERS INC                   
                                                            GC1-10           -553                  01/16/07   03/13/07    Cali Brothers                       
                                                            GC1-12          5,848                  01/16/07   02/09/07    Cali brothers                       
                                                            GC1-13          2,500                  01/16/07   02/09/07    Cali Brothers                       
                                                            Gc1-14          1,790                  01/16/07   02/09/07    Cali Brothers                       
 
07-2303   Reconstruction               0-013-017  11/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0740   Reconstruction               0-013-018  03/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1345   Reconstruction               0-013-019  06/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC1-1          -5,000                  11/15/10   11/17/10    COUNTRY CARPET DISTRIBUTORS INC     
                                                            HM1-1          -3,000                  11/15/10   11/17/10    NEW YORK INSULATION INC             
                                                            HM1-2           1,760                  10/17/11   12/12/11    NEW YORK INSULATION INC             
 
10-0462   Reconstruction               0-013-020  02/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            1,414                  02/17/12   06/12/12    ING CIVIL INC                       
                                                            GC-1          -15,774                  04/11/14   05/08/14    Key Interiors, LLC                  
                                                            GC-2            2,456                  02/17/12   06/12/12    ING CIVIL INC                       
                                                            GC-3            3,198                  02/17/12   06/12/12    ING CIVIL INC                       
                                                            GC-4            8,000                  02/17/12   06/12/12    ING CIVIL INC                       
                                                            GC-5           52,430                  02/17/12   06/12/12    ING CIVIL INC                       
 
10-1038   Reconstruction               0-013-021  04/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0967   Reconstruction               0-013-022  07/19/12  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1258   Reconstruction               0-013-023  03/26/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002          2,283                  01/04/21   03/16/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            02-001         35,165                  09/30/20   11/27/20    SOUTHEAST MECHANICAL CORP.          
                                                            02-002         18,682                  09/30/20   11/27/20    SOUTHEAST MECHANICAL CORP.          
                                                            02-004         -1,826                  01/04/21   02/25/21    SOUTHEAST MECHANICAL CORP.          
                                                            03-01           9,555                  09/23/20   11/06/20    SAUSTO CONTRACTING, INC.            
                                                            03-02          89,729                  12/07/20   02/03/21    SAUSTO CONTRACTING, INC.            
                                                            03-03            -456                  01/04/21   03/16/21    SAUSTO CONTRACTING, INC.            
                                                            03-04          -5,152                  01/04/21   03/16/21    SAUSTO CONTRACTING, INC.            
                                                            04-01           1,725                  10/30/20   02/08/21    A-TECH GROUP, LLC                   
                                                            04-02         -33,000                  11/19/20   02/04/21    A-TECH GROUP, LLC                   
                                                            04-03           3,680                  01/22/21   04/01/21    A-TECH GROUP, LLC                   
                                                            04-04           2,645                  01/22/21   04/01/21    A-TECH GROUP, LLC                   
                                                            ADEC-01             0                  01/04/21   02/25/21    SAUSTO CONTRACTING, INC.            
                                                            ADEC-02             0                  01/04/21   02/25/21    SAUSTO CONTRACTING, INC.            
                                                            ADGC-01A            0                  01/04/21   04/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            ADGC-01B            0                  01/04/21   04/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            ADGC-01C            0                  01/04/21   04/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            ADGC-01D            0                  01/04/21   04/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            ADGC-01E            0                  01/04/21   04/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            ADGC-01F            0                  01/04/21   04/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            ADGC-01G            0                  01/04/21   04/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            ADHC-01             0                  01/04/21   02/25/21    A-TECH GROUP, LLC                   
                                                            ADMC-01             0                  01/04/21   02/25/21    SOUTHEAST MECHANICAL CORP.          
                                                            ADMC-02             0                  01/04/21   02/25/21    SOUTHEAST MECHANICAL CORP.          
                                                            ADMC-03             0                  01/04/21   02/25/21    SOUTHEAST MECHANICAL CORP.          
                                                            NPES0101        4,344                  10/30/20   02/08/21    BARONE CONSTRUCTION GROUP, INC.     
                                                            NPES0203      -16,492                  10/30/20   01/08/21    SOUTHEAST MECHANICAL CORP.          
 
22-0984   Reconstruction               0-013-024  01/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Park Water Treatment Bldg.:
17-0847   New Construction             0-019-001  12/13/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            #1                  0                  03/28/19   03/28/19    G&M CONSTRUCTION CO.,INC.           
 

          Administration (see 1-017):
07-2317   Reconstruction               1-016-002  08/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
93-0399   Reconstruction               4-006-003  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1527   Reconstruction               4-006-005  05/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1491   Reconstruction               4-006-006  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2318   Reconstruction               4-006-008  08/26/08  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1039   Reconstruction               4-006-009  04/01/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
12-0014   New Construction             7-018-001  11/14/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
13-0628   Reconstruction               7-999-002  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1484   Reconstruction               7-999-004  07/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE

NORTHEAST (WEBUTUCK) CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-11-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXMillerton Elementary (sold 2017):
92-1323   Reconstruction               0-001-005  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1239   Reconstruction               0-001-006  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00006         -74,786                  11/04/04   06/14/05    Kingsley Arms                       
                                                            00006         -37,530                  11/04/04   06/14/05    Rok-Built Const.                    
 
05-0131   Reconstruction               0-001-007  08/30/05  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0892   Reconstruction               0-001-008  03/09/09  NO CHANGE ORDERS ON ELECTRONIC FILE

          Webutuck Jr/Sr High School:
90-1580   Reconstruction               0-002-007  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1324   Reconstruction               0-002-008  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1479   Reconstruction               0-002-009  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1240   Additions and Alterations    0-002-011  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         135,000                  04/15/02   04/29/02    Kingsley Arms                       
                                                            00001          42,000                  04/01/02   05/01/02    Rok-Built Const.                    
                                                            00001           3,396                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00001          28,519                  11/04/04   06/14/05    Rondout Elec.                       
                                                            00002          11,931                  04/15/02   04/29/02    Rok-Built Const.                    
                                                            00002         -18,476                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00002          63,336                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00002          -2,030                  11/04/04   11/05/04    Rondout Elec.                       
                                                            00002          63,336                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00003          57,466                  11/04/04   06/14/05    Rok-Built Const.                    
                                                            00003          18,166                  11/04/04   11/05/04    Rondout Elec.                       
                                                            00003           6,838                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00003          -1,238                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00003          -5,781                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00003         110,880                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00004               0                  11/04/04   11/05/04    Rok-Built Const.                    
                                                            00004          28,889                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00004         111,108                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00004           7,288                  06/22/05   08/13/07    CB Strain& Son, Inc.                
                                                            00005          58,267                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00005          -1,020                  11/04/04   11/05/04    Rok-Built Const.                    
                                                            00005          94,481                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00006         -17,206                  11/04/04   06/06/05    Kingsley Arms                       
                                                            00006         -91,993                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00007         -15,719                  11/04/04   11/05/04    Rok-Built Const.                    
                                                            00007         -41,946                  11/04/04   11/05/04    Kingsley Arms                       
 
03-1197   Reconstruction               0-002-012  07/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-05           2,125                  04/14/08     /  /      SAUSTO CONTRACTING, INC.            
                                                            GC-004         28,550                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC          
                                                            GC-004        -33,978                  03/23/07   05/16/07    Construction Services               
                                                            GC-005         -2,645                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC.         
                                                            GC-006         -7,230                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC.         
                                                            PC-02          -2,865                  12/08/05   05/24/06    DUTCHESS MECHANICAL, INC.           
 
08-0893   Reconstruction               0-002-013  03/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001                 0                  01/15/10   02/19/10    INGERSOLL RAND SECURITY TECHNOLOGY  
                                                            002REVHS      116,637                  01/15/10   02/19/10    INGERSOLL RAND SECURITY TECHNOLOGY  
                                                            003             1,611                  01/15/10   02/19/10    INGERSOLL RAND SECURITY TECHNOLOGY  
                                                            004            17,317                  08/30/10   09/24/10    INGERSOLL RAND SECURITY TECHNOLOGY  
 
09-0431   Reconstruction               0-002-014  11/20/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,175                  06/28/10   12/16/10    HOOSIC VALLEY CONTRACTORS INC       
                                                            003            11,410                  09/15/10   09/29/10    HOOSICK VALLEY CONTRACTORS INC      
 
14-0144   Reconstruction               0-002-017  08/19/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0570   Reconstruction               0-002-018  02/15/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01          91,430                  01/29/21     /  /      OCS INDUSTRIES, INC.                
 
17-0625   Reconstruction               0-002-019  03/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,000                  08/13/21     /  /      AGV ELECTRICAL SERVICES LLC         
                                                            HC-01          36,597                  09/26/18   10/22/18    C.B. STRAIN A DIVISION DYNAMIC SYS  
                                                            HC-02          22,623                  09/26/18   10/22/18    C.B. STRAIN DIVISION OF DYNAMC SYS  
                                                            HC-03          -2,375                  02/25/20   07/02/20    C.B. STRAIN, INC.                   
                                                            HC-04         -25,534                  02/25/20   07/02/20    C.B. STRAIN, INC.                   
                                                            SC-01           5,844                  09/26/18   01/25/19    A. COLARUSSO & SON INC              
 
20-1186   Reconstruction               0-002-020  07/06/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          12,669                  03/30/22   02/13/23    Transtional Blders                  
 
21-1565   Reconstruction               0-002-021  04/05/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01                0                  03/29/23   12/21/23    FERRARI & SON'S INC                 
                                                            1-02            3,347                  05/11/23   12/22/23    FERRARI & SONS                      
                                                            1-03            1,974                  05/11/23   12/22/23    FERRARI & SON                       
                                                            1-04           -1,118                  08/23/23     /  /      FERRARI & SON'S                     
                                                            101-01        -13,885                  03/29/23   12/21/23    FERRARI & SON'S INC                 
                                                            101-02              0                  04/25/23   12/27/23    FERRARI & SONS'S                    
                                                            101-03              0                  05/11/23   12/22/23    FERRARI & SONS                      
                                                            2-01                0                  03/29/23   12/21/23    DJ HEATING AND AIR CONDITIONING INC 
                                                            2-02          -36,000                  08/23/23     /  /      DJ HEATING & AIR CONDITIONING       
                                                            4-01                0                  03/29/23   12/21/23    ALL COUNTY ELECTRICAL CONTRACTORS   
                                                            401-01              0                  04/25/23     /  /      AMERICAN ELECTRIC                   
                                                            401-02              0                  04/25/23     /  /      AMERICAN ELECTRIC                   
                                                            401-03              0                  04/25/23   12/27/23    AMERICAN ELECTRIC                   
                                                            401-04              0                  04/25/23   12/27/23    AMERICAN ELECTRIC                   
                                                            401-05              0                  04/25/23   12/27/23    AMERICAN ELECTRIC                   
                                                            401-06              0                  08/14/23     /  /      AMERICAN ELECTRIC                   
 
23-0063   Reconstruction               0-002-022  11/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Amenia Elementary School:
92-1325   Reconstruction               0-003-009  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1241   Reconstruction               0-003-011  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004          58,382                  11/04/04   06/28/05    Kingsley Arms                       
                                                            00005          10,202                  11/04/04     /  /      Kingsley Arms                       
                                                            00005          94,481                  06/06/05   07/25/05    Kingsley Arms Inc.                  
 
03-1198   Reconstruction               0-003-012  07/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -11,007                  04/14/08   06/18/09    SAUSTO CONTRACTING, INC.            
                                                            GC-001         -1,939                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC.         
                                                            GC-002        -12,978                  12/08/05   07/13/06    CONSTRUCTION SERVICES, LLC.         
                                                            HC-01           1,370                  12/08/05   05/24/06    ASHLEY MECHANICAL, INC.             
                                                            HC-02           3,665                  12/08/05   05/24/06    ASHELEY MECHANICAL, INC.            
                                                            HC-03          12,445                  12/08/05   05/24/06    ASHLEY MECHANICAL, INC.             
                                                            PC-01         -23,086                  12/08/05   05/24/06    DUTCHESS MECHANICAL, INC.           
                                                            PC-03            -211                  01/22/07   08/15/07    Dutchess Mechanical                 
 

          Webutuck Elementary School:
92-1326   Reconstruction               0-004-007  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1242   Additions and Alterations    0-004-010  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004          23,837                  11/04/04   01/04/05    Kingsley Arms                       
                                                            00005          26,012                  11/04/04   07/25/05    Kingsley Arms                       
 
03-1196   Reconstruction               0-004-011  07/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02             564                  04/14/08   06/18/09    SAUSTO CONTRACTING INC.             
                                                            GC-003         -3,864                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC          
                                                            GC-007         11,132                  12/08/05   06/06/06    CONSTRUCTION SERVICES               
                                                            GC-08           2,143                  02/26/07     /  /      Construction Services               
 
08-0894   Reconstruction               0-004-012  03/09/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001E REV       -4,240                  08/12/10   09/13/10    BLACK ELECTRIC INC                  
                                                            002REVHS       42,989                  01/15/10   02/19/10    INGERSOLL RAND SECURITY TECHNOLOGY  
 
15-1314   Reconstruction               0-004-014  08/16/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0624   Reconstruction               0-004-015  03/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-02        -133,780                  12/24/19   01/15/20    A. COLARUSSO & SON, INC.            
 
22-2207FA Reconstruction               0-004-016  06/26/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0064   Reconstruction               0-004-017  11/28/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
93-1482   Additions and Alterations    5-006-003  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0998   Reconstruction               5-006-004  04/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0626   Reconstruction               5-006-005  03/16/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          -2,000                  12/21/18   03/12/19    S&L ROOFING & SHEETMETAL, INC.      
 

          District-Wide:
17-0181   Reconstruction               7-999-001  12/04/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SEC-01         10,473                  10/18/18   06/06/19    DAY AUTOMATION                      
                                                            SEC-02          9,165                  10/18/18   06/06/19    DAY AUTOMATION                      
                                                            SEC-03          6,444                  10/18/18   06/06/19    DAY AUTOMATION                      
                                                            TECH-01        -6,834                  07/01/19   07/03/19    CORE BTS INC.                       
 

PAWLING CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-12-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Pawling Elementary School:
90-0503   Reconstruction               0-001-006  01/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0623   Reconstruction               0-001-007  01/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1866   Reconstruction               0-001-008  08/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1325   Additions and Alterations    0-001-009  07/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0002   Reconstruction               0-001-010  07/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0003   Reconstruction               0-001-011  07/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0659   Reconstruction               0-001-013  03/04/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0689   Reconstruction               0-001-014  02/04/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,750                  01/05/09   04/22/09    LEED INDUSTRIES CORP.               
 
05-0063   Reconstruction               0-001-015  03/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0778   Reconstruction               0-001-017  03/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,750                  12/03/07   12/12/07    Leed Industries                     
                                                            002            17,876                  12/03/07   12/12/07    Leed Industries Corp                
                                                            003             1,800                  01/11/08   01/15/08    Leed Industries                     
                                                            004             4,160                  02/25/08   03/08/08    LEED INDUSTRIES CORP.               
 
09-0108   Reconstruction               0-001-018  08/11/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0889   Reconstruction               0-001-019  03/02/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  03/23/12   06/17/19    EVENTUS CONSTRUCTION                
 
12-0121   Reconstruction               0-001-021  08/30/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            91,227                  07/18/13   08/15/13    Independent Temparature Control     
 
12-1244   Reconstruction               0-001-022  11/21/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          2,344                  02/09/15   03/25/15    Meyer Contracting                   
                                                            GC-002          8,350                  02/09/15   03/25/15    Meyer Contracting                   
                                                            GC-003         16,808                  02/09/15   03/25/15    Meyer Contracting                   
                                                            GC-004          1,962                  02/09/15   03/25/15    Meyer Contracting                   
                                                            HVAC-001        3,984                  12/15/14   12/22/14    J&M Heating & AC, Inc.              
                                                            HVAC-002        1,696                  12/15/14     /  /      J&M Heating & AC, Inc.              
                                                            HVAC-003        9,527                  05/08/15   06/10/15    J&M Heating & AC Inc.               
 
16-0741   Additions and Alterations    0-001-023  09/14/17  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0974   Reconstruction               0-001-024  03/31/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1242   Reconstruction               0-001-025  12/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pawling High School:
90-0504   Reconstruction               0-002-005  01/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0624   Reconstruction               0-002-006  01/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1282   Reconstruction               0-002-008  05/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0915   Reconstruction               0-002-009  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0103   Reconstruction               0-002-010  11/15/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,557                  06/13/03   06/13/03    William Manfredi Const.             
 
99-0894   Reconstruction               0-002-011  03/30/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5              36,000                  12/09/02   12/10/02    CB Strain & Son                     
                                                            6                 754                  01/16/03   01/27/03    CB Strain & Son                     
                                                            7                 439                  01/16/03   01/27/03    CB Strain & Son                     
 
02-0662   Reconstruction               0-002-012  03/03/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -850                  03/03/04   04/07/04    Tech Elec.                          
                                                            2                 254                  03/03/04   03/05/04    Tech Elec.                          
                                                            3               1,213                  03/12/04   04/12/04    Tech Elec.                          
                                                            4                 790                  03/12/04   04/30/04    Tech Elec.                          
                                                            5                  50                  03/12/04   04/30/04    Tech Elec.                          
                                                            GC-1           -4,245                  03/03/04   03/17/04    Cali Brothers                       
                                                            GC-2           -1,000                  03/03/04   03/17/04    Cali Brothers                       
                                                            HVAC-1          2,478                  03/03/04     /  /      Southeast Mech.                     
                                                            HVAC-2          1,000                  03/03/04   03/11/04    Southeast Mech.                     
 
07-1616   Reconstruction               0-002-013  04/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,700                  10/31/08   05/21/09    LEED INDUSTERIES CORP.              
                                                            002            -3,203                  10/31/08   05/21/09    LEED INDUSTRIES CORP.               
                                                            1-003           1,569                  10/31/08     /  /      CONTECH BUILDING SYSTEMS            
 
09-1321   Reconstruction               0-002-014  06/15/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1406   Reconstruction               0-002-015  11/13/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,650                  07/18/13   07/29/13    Peter A. Camilli & Sons, Inc.       
                                                            002             6,342                  07/18/13   07/29/13    Peter A. Camilli & Son, Inc.        
                                                            003             2,432                  07/18/13   07/29/13    Peter A. Camilli & Son, Inc.        
                                                            004               705                  07/18/13   07/29/13    Peter A. Camilli & Sons, Inc.       
 
13-0124   Reconstruction               0-002-016  03/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,800                  09/26/16   10/19/16    Dutchess Mechanical, Inc.           
 
12-1245   Reconstruction               0-002-017  11/21/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0742   Reconstruction               0-002-018  09/14/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           1,369                  01/15/19   02/08/19    RLJ ELECTRIC CORP                   
                                                            EC-04            -580                  09/23/19   09/25/19    ELJ ELECTRIC CORP.                  
                                                            EC-05            -244                  09/23/19   09/25/19    RLJ ELECTRIC CORP.                  
                                                            GC-01           2,287                  09/25/18   10/25/18    MEYER CONTRACTING CORP              
                                                            GC-02          14,137                  09/25/18   10/25/18    MEYER CONTRACTING CORP              
                                                            GC-03         -20,500                  12/03/18   01/22/19    MEYER CONTRACTING CORP              
                                                            GC-04          -9,201                  12/03/18   01/22/19    MEYER CONTRACTING CORP              
                                                            GC-05          -2,250                  08/02/19   09/26/19    MEYER CONTRACTING CORP.             
                                                            HC-01           6,550                  09/25/18   10/25/18    MARKLEY MECHANICAL                  
                                                            HC-02          -5,000                  01/15/19   02/08/19    MARKLEY MECHANICAL                  
 
16-0921   Reconstruction               0-002-019  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           4,698                  09/25/18   01/25/19    ARROW STEEL WINDOW CORP             
                                                            GC-02          -4,568                  12/03/18   03/12/19    ARROW STEEL WINDOW CORP             
                                                            GC-03         -14,885                  12/03/18   03/12/19    ARROW STEEL WINDOW CORP             
                                                            GC-04           1,581                  02/22/19   03/12/19    ARROW STEEL WINDOW CORP.            
                                                            SC-01          32,425                  11/13/17   11/29/17    Clove Excavators, Inc.              
                                                            SC-02          -2,179                  02/20/18   02/28/18    Clove Excavators, Inc.              
 
17-0609   Reconstruction               0-002-020  08/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              11,723                  08/02/19   08/09/19    DNR LABORATORIES,LLC                
                                                            2              10,700                  08/02/19   08/09/19    DNR LABORATORIES,LLC                
                                                            3               2,625                  10/22/19   10/31/19    DNR LABORATORIES,LLC                
                                                            4               5,009                  11/05/19   11/08/19    DNR LABORATORIES, LLC               
                                                            5              14,149                  11/05/19   11/08/19    DNR LABORATORIES, LLC               
                                                            6              -1,310                  11/05/19   11/08/19    DNR LABORATORIES, LLC               
                                                            7              12,833                  11/05/19   11/08/19    DNR LABORATORIES, LLC               
 
21-1675   Additions and Alterations    0-002-021  12/30/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            23-001         -5,563                  07/10/23   12/28/23    FANSHAWE                            
 
21-0028   Reconstruction               0-002-022  11/12/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001         11,497                  07/28/22   09/26/23    Barone Const Group Inc              
                                                            01-002         15,000                  09/16/22   11/13/23    Barone Const Group Inc              
                                                            01-003              0                  09/16/22     /  /      Barone Const Group Inc              
                                                            01-003         24,000                  09/16/22   11/13/23    Barone Const Group Inc              
 
21-1243   Reconstruction               0-002-023  12/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pawling Middle School:
99-0038   New Construction             0-006-001  11/15/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             8,286                  06/13/03   06/13/03    CB Strain & Sons                    
                                                            005             4,900                  01/16/03   02/06/03    Huber Farms & Excavating            
                                                            007               708                  05/17/02   06/04/02    CB Strain & Sons                    
                                                            008             1,045                  05/17/02   06/04/02    CB Strain & Sons                    
                                                            015             3,246                  05/21/01   03/04/02    UW Marx                             
                                                            1-002          -2,500                  01/16/03   02/06/03    Huber Farms & Excavating            
                                                            1-003         -34,020                  01/16/03   02/06/03    Huber Farms & Excavating            
                                                            2CO-023         5,780                  06/13/03   06/13/03    UW Marx                             
                                                            2CO-028       -12,106                  06/13/03   06/13/03    UW Marx                             
                                                            2CO026          1,712                  09/24/02   10/30/02    UW Marx                             
                                                            2CO027            970                  09/24/02   10/30/02    UW Marx                             
                                                            2CO029          4,175                  09/24/02   10/30/02    UW Marx                             
                                                            2CO030          5,133                  09/24/02   10/30/02    UW Marx                             
                                                            2CO031         19,245                  09/24/02   10/30/02    UW Marx                             
                                                            4CO 002        26,900                  11/14/02   01/03/03    Telcar Group                        
                                                            CO1-001       -19,245                  06/13/03   06/13/03    Huber Farms & Excavating            
 
98-1480   Reconstruction               0-006-002  06/18/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004               517                  06/13/02   06/17/02    Sun-Up Enterprises                  
 
07-0550   Reconstruction               0-006-003  10/19/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,979                  10/31/08   07/27/09    MENGLER MECHANICAL, INC.            
 
13-0125   Reconstruction               0-006-004  03/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,800                  09/26/16   10/19/16    Dutchess Mechanical, Inc.           
 
12-1246   Reconstruction               0-006-005  11/21/13  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0743   Reconstruction               0-006-006  09/14/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           7,424                  12/15/19   02/11/19    RLJ ELECTRIC CORP                   
                                                            EC-03           1,502                  01/15/19   02/11/19    RLJ ELECTRIC CORP                   
                                                            PC-01           7,706                  10/19/18   11/09/18    S&O CONSTRUCTION SERVICES INC       
                                                            PC-02          -2,500                  03/28/19   04/01/19    S&O CONSTRUCTION SERVICES, INC.     
 
21-0029   Reconstruction               0-006-008  11/12/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005-001         1,100                  06/24/22   04/04/23    Landscape Unlimited Inc             
                                                            01-004          6,285                  09/16/22   11/13/23    Barone Const Group Inc              
                                                            01-005         -8,320                  11/16/22     /  /      BARONE CONSTRUCTION GROUP INC       
                                                            03-001         16,859                  09/16/22   10/31/23    Fanshawe Inc Rockland Elec          
                                                            03-002          3,427                  02/17/23     /  /      ROCKLAND ELEC                       
                                                            03-003          3,701                  07/10/23     /  /      FANSHAWE                            
                                                            04-001          4,997                  02/17/23   11/27/23    S&O CONST SERVICES INC              
                                                            05-002          8,100                  07/10/23   12/22/23    LANDSCAPE UNLIMITED                 
                                                            05-003        -18,000                  07/10/23   12/22/23    LANDSCAPE UNLIMITED                 
                                                            05-003        -75,000                  07/10/23   12/22/23    LANDSCAPING UNLIMITED               
                                                            05-004        -12,500                  07/10/23   12/22/23    LANDSCAPE UNLIMITED                 
                                                            05-004         -2,885                  07/10/23   12/22/23    LANDSCAPING UNLIMITED               
                                                            05-005        -10,000                  07/10/23   12/22/23    LANDSCAPE UNLIMITED                 
                                                            05-006         -2,500                  07/10/23   12/22/23    LANDSCAPE UNLIMITED                 
                                                            07-001          8,250                  07/28/22   09/26/23    Dant Clayton Corp                   
                                                            07-002          8,782                  07/10/23   12/22/23    DANT CLAYTON CORP                   
                                                            AD01-001         -557                  06/24/22   04/04/23    Barone Const Group Inc              
                                                            AD01-002            0                  07/28/22   09/26/23    Barone Const Group Inc              
                                                            AD01-004            0                  11/16/22   12/06/23    BARONE CONSTRUCTION GROUP INC       
                                                            AD03-001            0                  11/16/22   12/06/23    FANSHAWE INC                        
                                                            AD03-002            0                  11/16/22   12/06/23    FANSHAWE INC                        
                                                            AD03-003            0                  02/17/23   11/27/23    ROCKLAND ELEC                       
                                                            AD03-004            0                  02/17/23   11/27/23    ROCKLAND ELEC                       
                                                            AD05-001            0                  02/17/23   12/15/23    LANDSCAPE UNLIMITED INC             
                                                            AD05-002            0                  02/17/23   12/15/23    LANDSCAPE UNLIMITED INC             
 
21-1244   Reconstruction               0-006-009  12/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building:
21-0030   New Construction             2-015-001  11/12/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
07-1617   Reconstruction               3-003-003  04/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,360                  10/15/08   11/06/08    DAY ELECTRICAL CONTRACTING CORP.    
 

          Leased Bus Garage:
05-0040   Reconstruction               5-009-L01  01/26/06  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1339   Reconstruction               5-009-L02  03/12/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Transportation Facility:
12-1249   New Construction             5-013-001  12/26/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            25,170                  12/15/14   12/22/14    Landscape Unlimited                 
                                                            002             7,750                  12/15/14   12/22/14    Landscape Unlimited                 
                                                            003            19,042                  02/09/15   03/25/15    Landscape Unlimited                 
                                                            004             4,827                  02/09/15   03/25/15    Landscape Unlimited                 
                                                            005            30,570                  10/21/15     /  /      Landscape Unlimited                 
                                                            EC-001        -19,285                  12/15/14   12/22/14    Hudson Valley Electrical Constructio
                                                            EC-003         35,092                  03/23/15   03/27/15    Hudson valley Electrical Constructio
                                                            EC-004          9,105                  04/20/15   06/17/15    Hudson Valley Electrical Construct  
                                                            EC-005          6,764                  05/08/15   06/10/15    Hudson Valley Electrical Consruction
                                                            EC-006          3,469                  05/08/15   06/10/15    Hudson Valley Electrical Constructio
                                                            EC-007          1,806                  08/24/15   08/31/15    Hudson Valley Elect. Const. & Maint.
                                                            GC-001          5,532                  12/15/14   12/22/14    Meyer Contracting                   
                                                            GC-002          9,455                  05/26/15   06/10/15    Meyer Contracting                   
                                                            GC-003          4,313                  05/26/15   06/10/15    Meyer Contracting                   
                                                            GC-004          1,062                  08/07/17   08/10/17    Meyer Contracting                   
                                                            GC-005          1,518                  08/07/17   08/10/17    Meyer Contracting                   
                                                            GC-006          1,751                  08/07/17   08/10/17    Meyer Contracting                   
                                                            MC-001         45,435                  03/03/15   03/25/15    Mengler Mechanical, Inc.            
                                                            MC-003          9,090                  10/21/15   01/28/16    Mengler Mechanical, Inc.            
                                                            MC-004          1,420                  10/21/15   01/28/16    Mengler Mechanical, Inc.            
                                                            MC-005          4,155                  10/21/15   01/28/16    Mengler Mechanical, Inc.            
                                                            MC-006          6,804                  10/21/15   01/28/16    Mengler Mechanical, Inc.            
                                                            MC-007          2,200                  10/21/15   01/28/16    Mengler Mechanical, Inc.            
                                                            MC-02           1,083                  07/02/15   08/04/15    Mengler Mechanical Inc.             
                                                            PC-01             500                  08/24/15   08/31/15    Frank & Lindy Plumbing & Heating Inc
 

          Press Box:
21-0031   New Construction             7-014-001  11/12/21  NO CHANGE ORDERS ON ELECTRONIC FILE

PINE PLAINS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-13-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Seymour Smith School:
91-1518   Reconstruction               0-001-001  07/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0188   Reconstruction               0-001-002  10/21/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0544   Reconstruction               0-001-003  01/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1099   Reconstruction               0-001-004  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0591   Reconstruction               0-001-005  01/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1414   Reconstruction               0-001-006  05/01/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0435   Reconstruction               0-001-007  01/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1193   Reconstruction               0-001-008  05/18/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -1,992                  02/08/05   02/14/05    James Edgar roofing and sheet Metal 
 
09-0666   Reconstruction               0-001-011  03/30/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          15,775                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-02           8,265                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-03           6,868                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-04          18,280                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-05          19,863                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-06          30,773                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-07          47,439                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-08           5,617                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-09           1,059                  10/14/10   10/22/10    BAST HATFIELD INC                   
                                                            GC-10           8,854                  11/30/10   12/28/10    BAST HATFIELD INC                   
                                                            GC-11          15,660                  04/20/11   05/13/11    BAST HATFIELD INC                   
                                                            GC-11A         12,345                  07/18/11   08/08/11    BAST HATFIELD INC                   
                                                            GC-12          22,767                  04/20/11   05/13/11    BAST HATFIELD INC                   
                                                            GC-13          11,089                  04/20/11   05/13/11    BAST HATFIELD INC                   
                                                            GC-14          27,740                  04/20/11   05/13/11    BAST HATFIELD INC                   
                                                            GC-15          33,220                  04/20/11   05/13/11    BAST HATFIELD INC                   
                                                            GC-16          24,922                  08/29/11   09/20/11    BAST HATFIELD INC                   
                                                            GC-17          31,730                  08/29/11   09/20/11    BAST HATFIELD INC                   
                                                            GC-18          17,850                  08/22/11   09/07/11    BAST HATFIELD INC                   
                                                            GC-19          29,656                  08/22/11   09/07/11    BAST HATFIELD INC                   
                                                            GC-20          11,180                  01/06/12   04/27/12    BAST HATFIELD INC                   
                                                            GC-21           5,333                  01/11/12   05/01/12    BAST HATFIELD INC                   
 
07-0346   Reconstruction               0-001-012  09/12/07  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1081   Reconstruction               0-001-013  08/18/08  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0645   Reconstruction               0-001-014  09/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0745   Reconstruction               0-001-015  01/02/20  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0888FB Reconstruction               0-001-016  03/19/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-001           -342                  09/16/22   10/31/23    Key Const Servs LLC                 
                                                            02-003          2,976                  03/16/23   12/19/23    KEY CONSTRUCTION SERVICES, LLC      
                                                            02-004          2,661                  03/16/23   12/19/23    KEY CONSTURCTION SERVICES,LLC       
                                                            02-005         49,680                  03/16/23   12/19/23    KEY CONSTRUCTION SERVICES,LLC       
                                                            02-006         16,169                  03/16/23   12/19/23    KEY CONSTRUCTION SERVICES,LLC       
                                                            02-007          6,608                  03/16/23   12/19/23     KEY CONSTRUCTION SERVICES,LLC      
                                                            02-008            400                  03/16/23   12/19/23    KEY CONSTRUCTION SERVICES,LLC       
                                                            02-009         22,959                  03/16/23   12/19/23    KEY CONSTRUCTION SERVICES,LLC       
                                                            02-010         19,973                  03/16/23   12/19/23    KEY CONSTRUCTION SERVICES,LLC       
                                                            02-011         15,948                  07/06/23   12/18/23    KEY CONSTRUCTION SERVICES           
                                                            02-012         -6,194                  07/06/23   12/18/23    KEY CONSRUCTION SERVICES            
                                                            02-014         13,804                  07/06/23   12/18/23    KEY CONSTURCTION SERVICES           
                                                            02-015         11,455                  07/06/23   12/18/23    KEY CONSTRUCTION SERVICES           
                                                            02-016         98,200                  07/06/23     /  /      KEY CONSTRUCTION SERVICES           
                                                            03-001          2,552                  07/28/22   09/26/23    CB Strain; Divis of Dyamic Sys Inc  
                                                            03-002            872                  09/16/22   10/31/23    CB Strain A Div of Dynam Sys Inc    
                                                            03-003          1,987                  09/16/22   10/31/23    CB Strain                           
                                                            03-004         11,089                  03/16/23   12/19/23    CB STRAIN D.D.S,INC                 
                                                            03-005          1,394                  03/16/23   12/19/23    CB STRAIN D.D.S, INC                
                                                            03-006          2,450                  03/16/23   12/19/23    CB STRAIN D.D.S,INC                 
                                                            03-007          1,363                  03/16/23   12/19/23    C.B STRAIN D.D.S,INC                
                                                            03-008            575                  03/16/23   12/19/23    C.B STRAIN D.D.S,INC                
                                                            03-009          3,843                  03/16/23   12/19/23    CB STRAIN D.D.S,INC                 
                                                            03-010         12,140                  03/16/23   12/19/23    C.B STRAIN D.D.S,INC                
                                                            03-011          4,402                  03/16/23   12/19/23    C.B STRAIN D.D.S,INC                
                                                            03-012          4,976                  03/16/23   12/19/23    CB STRAIN D.D.S,INC                 
                                                            03-013          4,776                  03/16/23   12/19/23    CB STRAIN D.D.S,INC                 
                                                            03-014         27,695                  07/06/23   12/18/23    CB STRAIN                           
                                                            03-015          4,071                  07/06/23   12/18/23    CB STRAIN                           
                                                            04-001          2,774                  07/06/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            04-002          2,619                  07/06/23   12/18/23    RLJ ELECTRIC                        
                                                            04-003          1,736                  07/06/23   12/18/23    RLJ ELECTRIC CORP                   
                                                            06-003          3,536                  03/16/23   12/19/23    NIKO K. CONSTRUCTION CORP.          
                                                            07-001          9,659                  11/16/22   07/25/23    SIEMENS INDUSTRY INC                
 
21-0633   Reconstruction               0-001-017  01/06/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cold Springs Elementary:
95-1100   Additions and Alterations    0-002-002  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0590   Reconstruction               0-002-003  01/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1066   Reconstruction               0-002-004  03/13/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1007   Reconstruction               0-002-005  06/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0646   Reconstruction               0-002-006  09/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0889   Reconstruction               0-002-007  03/19/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            06-002            172                  03/16/23   12/19/23    NIKO K. CONSTRUCTION CORP.          
 
22-0925   Reconstruction               0-002-008  01/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stissing Mt Jr/Sr High School:
93-0545   Reconstruction               0-009-001  01/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1101   Reconstruction               0-009-002  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0592   Reconstruction               0-009-003  01/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0259   Additions and Alterations    0-009-004  02/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1              -8,250                  02/27/02   05/06/02    David Christopher                   
                                                            1               6,475                  08/05/02   08/16/02    Netrix                              
                                                            1             -14,329                  10/17/02   11/07/02    Crisafulli Bros.                    
                                                            1              11,975                  05/02/03   05/07/03    Facilities Equipment and Services   
                                                            1               2,664                  05/05/03   05/07/03    Nickerson Corp.                     
                                                            1              -4,860                  11/14/03   12/22/03    Weisburgh Mech.                     
                                                            1               2,663                  05/28/04   06/09/04    J&J Sass Elec.                      
                                                            1             -22,355                  06/21/05   06/22/05    Delsignore Blacktop Paving          
                                                            2              -7,364                  06/06/02   08/15/02    David Christopher                   
                                                            2              -1,680                  10/09/02   10/30/02    Netrix                              
                                                            2              11,849                  01/08/03   02/12/03    Crisafulli Bros.                    
                                                            2             -13,365                  03/25/03   03/28/03    DelSignore Blacktop Paving          
                                                            2              11,515                  05/02/03   05/07/03    Facilities Equipment and Services   
                                                            2              23,500                  08/19/03   07/12/05    Nickerson Corp                      
                                                            2              -4,384                  05/28/04   06/09/04    J&J Sass Elec.                      
                                                            2-Revisd      -45,595                  09/27/05   10/14/05    Wesiburgh mechanical Electric       
                                                            3              -6,053                  06/19/02   08/15/02    David Christopher                   
                                                            3              -1,179                  07/14/03   07/24/03    Crisafulli Bros.                    
                                                            3               1,060                  09/18/03   07/12/05    Nickerson Corp.                     
                                                            3               4,400                  03/29/04   04/08/04    Facilities Equipment and Service    
                                                            4             -51,753                  06/12/06   12/12/06    David Christopher, Inc.             
                                                            5              -8,500                  05/23/06   12/12/06    David Christopher Inc               
 
01-0111   Reconstruction               0-009-007  08/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2316   Reconstruction               0-009-008  07/01/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              27,200                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            2              -5,600                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            3              -4,918                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            4              -3,386                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            5              -1,446                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            6              -1,545                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            7              -1,086                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            8              -9,020                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
 
06-1355   Reconstruction               0-009-009  09/05/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -6,846                  05/15/09   08/31/09    TRANSITIONAL BUILDERS INC           
                                                            GC-02           2,353                  11/26/08   04/06/09    TRANSITIONAL BUILDERS, INC.         
                                                            GC-03          -1,500                  12/10/08   05/04/09    TRANSITIONAL BUILDERS               
                                                            HC-01           1,145                  05/06/08   08/07/08    HARKINS MECHANICAL & CONSTRUCTION   
 
08-0097   Reconstruction               0-009-010  10/08/08  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0170   Reconstruction               0-009-011  03/21/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0096   Reconstruction               0-009-012  09/06/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0647   Reconstruction               0-009-013  09/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1218   Reconstruction               0-009-014  03/16/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0903   Reconstruction               0-009-015  04/25/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          18,669                  11/14/19   11/21/19    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-02           4,849                  12/13/19   12/26/19    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-03           5,275                  12/13/19   01/21/20    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-04               0                  02/17/21   04/09/21    KASSELMAN ELECTRIC CO., INC.        
                                                            EC-05           5,042                  02/17/21   04/09/21    KASSELMAN ELECTRIC CO., INC.        
                                                            GC-01           2,388                  08/21/19   08/22/19    BONACEQUISTI BROTHERS CONSTRUCTION  
                                                            GC-02               0                  06/12/20   08/07/20    Bonaquisti Brothers                 
                                                            GC-03          17,462                  12/10/21   09/22/22    Bonacquisti Bros Const              
                                                            MC-01         -12,077                  03/09/20   06/29/20    T. MCELLIGOTT, INC                  
                                                            TC-01          20,000                  06/12/20   08/07/20    Janson Industries                   
                                                            TC-02          -3,189                  12/11/20   02/25/21    JANSON INDUSTRIES                   
 
21-0890   Reconstruction               0-009-017  03/19/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-002          9,867                  03/16/23   12/19/23    KEY CONSTRUCTION SERVICES, LLC      
                                                            02-013         14,336                  07/06/23     /  /      KEY CONSTURCTION SERVICES           
 

          Storage Shed:
06-1356   New Construction             2-011-001  09/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Shop -NoAid(frmrBusGarag:
92-1492   Reconstruction               5-004-001  07/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0117   Reconstruction               5-004-002  09/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0648   Reconstruction               5-004-003  09/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage (New):
14-0608   New Construction             5-013-001  09/24/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01          -1,600                  04/04/17   04/12/17    Control Network Communications, Inc.
                                                            EC-01          -3,189                  06/16/17   07/14/17    J & J Sass Electric, Inc.           
                                                            GC-01         -14,918                  03/26/18   03/29/18    Thomas Gleason, Inc.                
                                                            HC-01           4,502                  03/26/18   03/29/18    MDS HVAC-R, Inc.                    
                                                            PC-01          -6,436                  10/19/16   11/02/16    Ashley Mechanical, Inc.             
                                                            PC-02          -2,953                  10/13/16   11/04/16    Ashley Mechanical, Inc.             
                                                            PC-03           4,688                  01/03/17   01/06/17    Ashley Mechanical, Inc.             
                                                            PC-04           1,896                  05/01/17   05/10/17    Ashley Mechanical, Inc.             
                                                            SC-01           4,636                  04/18/17   05/22/17    Gallo Construction Corp.            
                                                            SC-02          -3,864                  04/18/17   05/22/17    Gallo Construction Corp.            
 

          Press Box:
06-1357   New Construction             7-010-001  09/05/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -6,744                  09/18/08   10/21/08    hudson Valley EC & M ,Inc           
 

          District-Wide:
16-0658   Reconstruction               7-999-001  07/26/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01            -321                  02/22/19   06/06/19    FOREMOST ELECTRIC CORP.             
                                                            CC-02          -4,782                  02/22/19   06/06/19    FOREMOST ELECTRIC CORP.             
                                                            SC-01          -5,745                  03/28/19   06/06/19    ECLIPSE NETWORK SOLUTIONS           
 

POUGHKEEPSIE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-15-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Columbus School #3 (AdminBldg):
90-1124   Reconstruction               0-001-001  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1412   Reconstruction               0-001-002  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0855   Reconstruction               0-001-003  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0943   Reconstruction               0-001-004  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0987   Reconstruction               0-001-006  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0819   Reconstruction               0-001-008  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         5,094                  12/04/03   03/15/04    Sun Up Enterprises                  
                                                            001-002        19,300                  12/04/03   03/15/04    Sun Up Enterprises                  
                                                            001-003       -28,502                  12/04/03   03/15/04    Sun Up Enterprises                  
                                                            001-006         1,711                  04/30/04   05/11/04    Sun Up Enterprises                  
                                                            002-003        -1,186                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004         3,000                  04/12/04     /  /      Meyer Contracting                   
                                                            002-007           436                  06/17/04   06/28/04    Meyer Contracting                   
                                                            004-002         1,047                  04/06/04   04/28/04    Palombo Group                       
 
03-0301   Reconstruction               0-001-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003-002        -5,236                  12/13/04     /  /      Weather Guard Roofing               
                                                            005-010         2,260                  06/28/05     /  /      CB Strain and Sons Inc              
                                                            005-011         2,260                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-012         2,260                  06/28/05     /  /      CB Strain and Son inc               
                                                            006-008           710                  03/21/05   01/03/06    Hudson Valley Electrical            
 
10-0890   Reconstruction               0-001-010  09/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E1-02B          1,762                  03/20/13   07/17/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            M1-05          14,896                  12/13/13   02/06/14    Ashley Mechanical, Inc.             
 
10-0333   Reconstruction               0-001-011  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1922   Reconstruction               0-001-012  07/19/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01            -17,089                  07/29/19   08/01/19    DIGESARE MECHANICAL, INC.           
 
19-0280   Reconstruction               0-001-013  10/16/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0742   Reconstruction               0-001-014  03/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0330   Reconstruction               0-001-015  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1857   Reconstruction               0-001-016  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          SFB Morse School #5:
90-1125   Reconstruction               0-002-002  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1413   Reconstruction               0-002-003  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0856   Reconstruction               0-002-004  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0944   Reconstruction               0-002-005  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0990   Reconstruction               0-002-007  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1039   Reconstruction               0-002-008  06/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0302   Reconstruction               0-002-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         2,100                  08/10/04   09/08/04    Sun Up Enterprises                  
                                                            001-006           750                  10/28/04   11/19/04    Sun Up Enterprises                  
                                                            001-007         2,736                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            001-014             0                    /  /       /  /                                          
                                                            001-014             1          17,997  09/05/05   10/25/05    Rhinebeck Architecture and Planning,
                                                            001-015        19,470                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-016        18,894                  08/09/05   11/08/05    THE POLMBO GROUP                    
                                                            001-017        15,703                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-018        19,918                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-0190       15,703                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-020        19,030                  08/09/05   11/08/05    THE PALOMBO                         
                                                            004-001         6,857                  04/18/05   07/14/05    Dutchess Mechanical                 
                                                            005-003         1,572                  11/05/04     /  /      CB Strain Son Inc                   
                                                            005-004         9,161                  12/17/04   06/23/05    CB Strain Son Inc                   
                                                            005-006           985                  01/24/05   06/29/05    CB Strain and Sons                  
                                                            005-010         2,261                  06/28/05     /  /      CB strain and Son inc               
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-016         2,356                  11/23/05     /  /      CB Strain and Son Inc               
                                                            005-017           549                  11/23/05     /  /      C.B. Strain & Son Inc.              
                                                            006-003        -2,442                  09/13/04   10/14/04    Hudson Valley Elec.                 
                                                            006-004         5,290                  09/27/04   10/28/04    Hudson Valley Elec.                 
                                                            006-006         3,275                  12/13/04   06/23/05    Hudson Valley electrical Constructio
                                                            006-008         4,056                  03/21/05   01/03/06    Hudson Valley Electrical Contr      
                                                            006-009         2,502                  03/21/05   01/04/06    Hudson Valley Electrical Cons       
                                                            006-011        -1,515                  05/24/05   06/24/05    Hudson Valley Electrical            
                                                            006-022         1,796                  12/19/05   04/21/06    Hudson valey electrical Construction
                                                            006-026         5,336                  04/25/06     /  /      Hudson Valley Electrical            
                                                            008-001         3,455                  10/12/04   10/22/04    Excel Insulation                    
                                                            2.4-008        43,345                  01/24/05   04/01/05    Glomar Construction                 
                                                            2.4-009         3,279                  01/25/05   02/08/05    Glomar Construction                 
                                                            2.4-010        18,136                  02/24/05     /  /      Glomar Construction                 
                                                            2.4-011           837                  03/02/05   07/25/05    Glomar Construction                 
                                                            2.4-012         7,113                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-013         1,021                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-015         2,030                  06/28/05     /  /      Glomar Construction                 
                                                            2.4-016         8,270                  08/09/05   11/08/05    GLOMAR CONSTRUCTION INC.            
                                                            2.4-022          -250                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-024          -878                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-026         3,238                  06/29/06   07/24/06    Glomar COnstruction                 
                                                            24-005          1,326                  11/19/04   12/13/04    Glomar Construction                 
 
10-0891   Reconstruction               0-002-010  08/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-02D          1,410                  03/20/13   07/17/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            M1-07           1,257                  12/13/13   01/24/14    Ashley Mechanical, Inc.             
 
10-0334   Reconstruction               0-002-011  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1334   Reconstruction               0-002-012  02/18/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1689   Reconstruction               0-002-013  06/05/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-1              -792                  12/15/21   10/11/22    Weatherproof Tech Inc               
 
21-0743   Reconstruction               0-002-014  03/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0682FA Reconstruction               0-002-015  12/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0331   Reconstruction               0-002-016  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1858   Reconstruction               0-002-017  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gov. Clinton School #8:
90-1126   Reconstruction               0-004-001  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1414   Reconstruction               0-004-002  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0857   Reconstruction               0-004-003  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0945   Reconstruction               0-004-004  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0988   Reconstruction               0-004-006  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1040   Reconstruction               0-004-007  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002          6,471                  01/15/03   01/27/03    Meyer Contracting                   
                                                            02-002            456                  01/15/03   01/27/03    Dutchess Mechanical                 
                                                            03-003          4,503                  01/15/03   01/27/03    Ashley Mechanical                   
 
02-0820   Reconstruction               0-004-008  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         3,151                  08/10/04   09/08/04    Sun Up Enterprises                  
                                                            002-002        -1,040                  02/18/04   03/03/04    Meyer Contracting                   
                                                            002-003        -1,186                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004       -15,000                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-007           634                  06/17/04   06/28/04    Meyer Contracting                   
                                                            002-011        -1,000                  01/11/05   03/18/05    Meyer Contracting Corp              
                                                            004-002           162                  04/06/04   04/28/04    Ashley Mech.                        
                                                            005-001         1,362                  12/30/03   01/21/04    CB Strain & Sons                    
                                                            006-003         2,988                  03/16/04   04/26/04    Hudson Valley Elec.                 
 
03-0303   Reconstruction               0-004-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         3,151                  08/10/04     /  /      Sun Up Enterprises                  
                                                            001-008         2,075                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            001-013        17,235                  11/09/05   11/08/05    THA PALOMBO GROUP                   
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and son                   
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            006-001           225                  08/30/04   09/24/04    Hudson Valley Elec.                 
                                                            006-008           749                  03/21/05   01/03/06    Hudson Valley Electrical            
                                                            006-016         1,112                  09/12/05   09/20/05    Hudson Valley Electrical Constructio
                                                            006-023         6,255                  04/25/06     /  /      Hudson Valley electrical Constructio
                                                            2.4-019        11,523                  09/26/05   10/18/05    Glomar Construction                 
                                                            2.4-025          -500                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-027         1,794                  06/29/06   07/13/06    Glomar Construction                 
 
10-0892   Reconstruction               0-004-010  09/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            31-02A          2,115                  03/20/13   07/17/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            G1-02          15,674                  04/02/13   06/28/13    ARRIS CONTRACTING COMPANY INC       
                                                            G1-06         -55,425                  04/02/13   07/01/13    ARRIS CONTRACTING COMPANY INC       
                                                            GM-01          14,234                  04/01/13   07/01/13    MARFI CONTRACTING CORP              
                                                            GM-02          11,963                  04/01/13   07/01/13    MARFI CONTRACTING CORP              
                                                            M1-06            -896                  12/13/13   01/24/14    Ashely Mechanical, Inc.             
                                                            S1-01               0                  04/02/13   07/01/13    ARRIS CONTRACTING COMPANY INC       
                                                            S1-02            -400                  12/13/13   01/24/14    Arris Contracting Company, Inc.     
 
10-0335   Reconstruction               0-004-011  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0214   Reconstruction               0-004-012  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1690   Reconstruction               0-004-013  06/18/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-1             6,339                  12/15/21   10/11/22    Weatherproof tech Inc               
 
21-0744   Reconstruction               0-004-014  03/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0683FA Reconstruction               0-004-015  12/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0332   Reconstruction               0-004-016  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1859   Reconstruction               0-004-017  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          C.B. Warring School #10:
91-0858   Reconstruction               0-005-002  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1064   Reconstruction               0-005-003  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0946   Reconstruction               0-005-004  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0991   Reconstruction               0-005-006  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1041   Reconstruction               0-005-007  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-005          3,537                  01/15/03   01/27/03    Meyer Contracting                   
 
02-0821   Reconstruction               0-005-008  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-002        19,300                  12/04/03   03/15/04    Sun Up Ent.                         
                                                            001-004        11,712                  12/30/03   03/15/04    Sun Up Ent.                         
                                                            001-005         7,198                  03/05/04   04/07/04    Sun Up Ent.                         
                                                            001-007        -8,242                  08/10/04   09/09/04    Sun Up Ent.                         
                                                            002-001        -1,606                  12/30/03   03/15/04    Meyer Contracting                   
                                                            002-002         2,187                  02/18/04   03/03/04    Palombo Group                       
                                                            002-003        -2,174                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004         3,000                  04/12/04     /  /      Meyer Contracting                   
                                                            002-007         6,257                  06/17/04   06/28/04    Meyer Contracting                   
                                                            002-008         5,655                  08/30/04   09/23/04    Meyer Contracting                   
                                                            002-009           717                  10/12/04   10/18/04    Meyer Contracting                   
                                                            004-001        14,926                  03/05/04   04/26/04    Ashley Mech.                        
                                                            004-003        -1,855                  07/15/04   07/21/04    Ashley Mech.                        
                                                            005-002         2,431                  01/13/04   01/26/04    CB Strain & Sons                    
                                                            005-003        -7,163                  03/02/04   04/26/04    CB Strain & Sons                    
                                                            006-001           582                  12/30/03   01/21/04    Hudson Valley Elec.                 
                                                            006-003         1,480                  03/16/04   04/26/04    Hudson Valley Elec.                 
                                                            006-004           706                  05/19/04   05/27/04    Hudson Valley Elec.                 
                                                            006-005        -5,209                  11/19/04   05/02/05    Hudson Valley Electrical            
 
03-0304   Reconstruction               0-005-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-011         2,261                  06/28/05     /  /      Cb strain and Son                   
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            007-002         7,700                  09/07/05   09/12/05    Buffalo Hotel Supply                
 
10-0336   Reconstruction               0-005-010  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0893   Reconstruction               0-005-011  09/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-02F          1,410                  03/20/13   07/17/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            G1-05           3,122                  04/02/13   07/01/13    ARRIS CONTRACTING COMPANY INC       
                                                            M1-02           6,422                  04/11/13   12/04/13    ASHLEY MECHANICAL INC               
                                                            M1-08           1,418                  12/13/13   01/24/14    Ashley Mechanical, Inc.             
 
13-0215   Reconstruction               0-005-012  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0745   Reconstruction               0-005-013  03/21/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             32,652                  04/18/23   01/02/24    AMERESCO                            
                                                            02             42,632                  04/18/23   12/27/23    AMERESCO                            
                                                            03           -683,538                  04/18/23   01/02/24    TRITON CONSTRUCTION                 
                                                            1B2-02          3,938                  04/18/23   01/02/24    WEATHERPROOFING TECH                
                                                            1B2-02.2        2,715                  04/18/23   01/02/24    WEATHERPROOFING TECH                
 
22-0684FA Reconstruction               0-005-014  12/29/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1860   Reconstruction               0-005-015  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0333   Reconstruction               0-005-016  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-2142   Reconstruction               0-005-018  07/24/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Krieger School No. 11:
90-1127   Reconstruction               0-006-002  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1415   Reconstruction               0-006-003  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0859   Reconstruction               0-006-004  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0853   Reconstruction               0-006-005  03/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1304   Reconstruction               0-006-006  06/12/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0989   Reconstruction               0-006-007  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1042   Reconstruction               0-006-008  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-003            570                  01/15/03   01/27/03    Meyer Contracting                   
 
03-0305   Reconstruction               0-006-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001-002         2,600                  09/27/04   10/04/04    Sun Up Enterprises                  
                                                            001-006           750                  10/28/04   11/19/04    Sun Up Enterprises                  
                                                            001-007         2,685                  11/05/04   11/19/04    Sun Up Enterprise                   
                                                            001-008         2,000                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            001-009         4,105                  11/19/04   11/29/04    Sun Up Enterprises                  
                                                            004-001         6,857                  04/18/05   07/14/05    Dutchess Mechanical Inc             
                                                            005-007         1,498                  03/02/05   01/03/06    CB Strain and Son Inc               
                                                            005-009           894                  05/24/05   06/30/05    CB Strain and Son Inc               
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son Inc               
                                                            006-002         3,754                  08/30/04   09/23/04    Hudson Valley Elec.                 
                                                            006-005         1,148                  11/19/04   06/21/05    Hudson Valley Elec.                 
                                                            006-007         6,416                  02/15/05   07/26/05    Hudson Valley Electrical Constructio
                                                            006-008           710                  03/21/05   01/03/06    Hudson Valley Electrical            
                                                            006-010         5,166                  04/18/05   06/03/05    Hudson Valley Electrical            
                                                            006-011           327                  05/24/05   06/24/05    Hudson Valley Electrical            
                                                            006-015         6,413                  08/09/05   10/25/05    Rhinebeck Arch. and Planning, P.C.  
                                                            006-017           377                  09/12/05   09/20/05    Hudson Valley Electrical            
                                                            006-024         2,176                  04/25/06     /  /      Hudson Valley Electrical            
                                                            006-026         1,771                  04/25/06     /  /      Hudson Valley Electrical            
                                                            007-001           233                  12/13/04   12/24/04    Buffalo Hotel Supply                
                                                            2.4-002         3,317                  09/10/04   09/27/04    Glomar Construction                 
                                                            2.4-003         2,200                  09/10/04   09/27/04    Glomar Construction                 
                                                            2.4-006           736                  01/24/05   02/08/05    glomar Construction                 
                                                            2.4-007         3,969                  01/24/05   02/08/05    Glomar Construction                 
                                                            2.4-009         2,532                  01/25/05   02/08/05    Glomar Construction                 
                                                            2.4-012         2,264                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-014         8,519                  04/27/05   06/03/05    Glomar Construction Inc             
                                                            2.4-015         9,919                  06/28/05     /  /      Glomar Construction                 
                                                            2.4-019           741                  09/26/05   10/18/05    Glomar Construction                 
                                                            2.4-022          -250                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-023         4,830                  06/29/06   07/13/06    Glomar Construction                 
                                                            2.4-026        18,101                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4025         -1,550                  06/29/06   07/24/06    Glomar Construction                 
                                                            4-004           1,457                  09/13/04   10/04/04    Glomar Construction                 
                                                            5-002           3,347                  09/13/04   10/14/04    CB Strain & Sons                    
 
10-0894   Reconstruction               0-006-010  08/23/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-02C          1,410                  03/20/13   07/17/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            SBM01               0                  04/01/13   07/01/13    SEA BREEZE GENERAL CONSTRUCTION INC 
                                                            SBM02          -5,555                  04/01/13   07/01/13    SEA BREEZE GENERAL CONSTRUCTION INC 
                                                            SBM03          -5,696                  04/01/13   07/01/13    SEA BREEZE GENERAL CONSTRUCTION INC 
 
10-0337   Reconstruction               0-006-012  06/27/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M1-06          -8,191                  11/02/15   12/01/15    Ashley Mechanical, Inc.             
 
13-0216   Reconstruction               0-006-013  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0746   Reconstruction               0-006-014  03/21/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1B2-03         -6,788                  04/18/23   01/02/24    WEATHERPROOFING TECH                
                                                            1B27-01             0                    /  /       /  /                                          
 
22-0334   Reconstruction               0-006-015  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1861   Reconstruction               0-006-016  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Junior/Senior High School:
91-0860   Reconstruction               0-007-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1416   Reconstruction               0-007-003  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1123   Reconstruction               0-007-004  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0854   Reconstruction               0-007-005  03/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0834   Reconstruction               0-007-006  03/31/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1030   Reconstruction               0-007-007  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0580   Reconstruction               0-007-008  02/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0992   Reconstruction               0-007-010  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0306   Reconstruction               0-007-012  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-010        19,390                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-011        19,833                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-012        19,586                  08/09/05   11/09/05    THE PALOMBO                         
                                                            001-021        73,000                  09/26/05   10/18/05    Sun Up Enterprises                  
                                                            003-001         3,570                  08/30/04   09/24/04    WeatherGuard Roofing                
                                                            003-002        -2,472                  12/13/04   12/24/04    WeatherGuard Roofing                
                                                            004-002         7,514                  06/14/05   06/30/05    Dutchess Mechanical                 
                                                            004-003         3,599                  08/19/05   08/25/05    Dutchess Mechanical                 
                                                            004-007        19,647                  03/12/06     /  /      Dutchess Mechanical Inc.            
                                                            005-001       -15,000                  08/10/04   09/08/04    CB Strain & Son                     
                                                            005-003           923                  11/05/04   06/21/05    CB Strain & Son                     
                                                            005-005        10,132                  12/17/04   06/23/05    CB Strain & Sons                    
                                                            005-008         1,839                  04/18/05   06/07/05    CB Strain and Son Inc               
                                                            005-010        22,261                  06/28/05     /  /      CB Strain and sons                  
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and sons Inc              
                                                            005-012         2,261                  07/28/05     /  /      CB Strain and Son inc               
                                                            005-013         1,532                  09/05/05   10/25/05    Rhinebeck Arch. and planning, P.C.  
                                                            005-014           787                  09/12/05   09/20/05    CB Strain Son Inc                   
                                                            006-001        -1,072                  08/30/04   09/24/04    Hudson Valley Elec.                 
                                                            006-005        -1,037                  11/19/04   06/21/05    Hudson Valley Elec.                 
                                                            006-007           345                  02/15/05   07/26/05    Hudson Valley Electrical            
                                                            006-008         1,146                  03/21/05   01/03/06    Hudson Valley Electrical Construct  
                                                            006-010         1,174                  04/18/05   06/03/05    Hudson Valley Electrical Construct  
                                                            006-011         3,180                  05/24/05   06/24/05    Hudson Valley Electrical            
                                                            006-012         2,225                  06/28/05   07/21/05    Hudson Valley Electrical            
                                                            006-018         8,081                  09/12/05   09/20/05    Hudson valley electrical Constructio
                                                            006-018         8,081                  09/12/05     /  /      Hudson Valley electrical            
                                                            006-019        24,260                  09/26/05   10/04/05    Hudson Valley electrical            
                                                            006-025         3,775                  04/25/06     /  /      Hudson Valley Electrical            
                                                            006-026         1,491                  04/25/06     /  /      Hudson Valley Electrical            
                                                            2.4-001        22,039          22,039  09/10/04   09/28/04    Glomar Construction                 
                                                            2.4-006       -10,000                  01/24/05   02/08/05    Glomar Construction                 
                                                            2.4-009         3,182                  01/25/05   02/08/05    Glomar Construction                 
                                                            2.4-010         1,683                  02/24/05   03/31/05    Glomar Construction                 
                                                            2.4-011        16,281                  03/02/05   07/25/05    Glomar Construction Inc             
                                                            2.4-012         1,117                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-013        15,493                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-015         5,015                  06/28/05     /  /      glomar Construction                 
                                                            2.4-017             0                  11/09/05   11/08/05    GLOMAR CONSTRUCTION INC.            
                                                            2.4-021        -7,420                  06/29/06   07/13/06    Glomar Construction                 
                                                            2.4-022        14,146                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-025        -1,268                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-026        -2,400                  06/29/06   07/24/06    Glomar Construction                 
                                                            24-005          5,998                  11/19/04   12/13/04    Glomar Construction                 
                                                            24-018         24,713                  09/26/05   10/12/05    Glomar Construction                 
 
10-0895   Reconstruction               0-007-013  07/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CCI02               0                  04/12/13   07/01/13    COPELAND COATINGS COMPANY INC       
                                                            E2-01               0                  04/11/13   07/17/13    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            E2-04          19,271                  04/11/13   10/11/13    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            E2-05          16,231                  04/11/13   10/11/13    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            E2-08           9,403                  04/11/13   10/11/13    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            E2-10           8,001                  04/11/13   10/11/13    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            E2-11           1,148                  04/11/13   07/17/13    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            E2-12          13,783                  04/11/13   10/23/13    SHOCK ELECTRICAL CONTRACTORS INC    
                                                            E2-13           5,320                  05/13/13   12/04/13    Shock Electrical Contractors, Inc.  
                                                            G2-01               0                  04/15/13   07/01/13    DIVINE CONSTRUCTION CORP            
                                                            G2-02          19,992                  04/15/13   08/02/13    DIVINE CONSTRUCTION CORP            
                                                            G2-03          16,530                  04/15/13   08/02/13    DIVINE CONSTRUCTION CORP            
                                                            G2-04          16,681                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-05          16,764                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-06          16,385                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-07          17,235                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-08          19,438                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-09          19,320                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-10          19,986                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-11          18,217                  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-12          12,317          12,317  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-13          19,968          19,968  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-14          15,904          15,904  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-15          10,367          10,367  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-16          11,510          11,510  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-17          16,139          16,139  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-18          11,545          11,545  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-19          13,159          13,159  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-20           8,011                  04/12/13   08/02/13    DIVINE CONSTRUCTION CORP            
                                                            G2-22          14,019          14,019  04/12/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-23          12,016          12,016  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-24          13,842          13,842  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-25          13,901          13,901  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-26          12,193          12,193  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-27           8,011           8,011  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-28           4,123           4,123  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-29          18,731          18,731  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-30          14,608          14,608  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-31          13,312          13,312  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-32          14,137          14,137  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-33           8,011           8,011  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-34          16,581          16,581  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-35          21,176          21,176  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-36          12,116                  04/15/13   08/02/13    DIVINE CONSTRUCTION CORP            
                                                            G2-37           5,400                  04/15/13   07/16/13    DIVINE CONSTRUCTION CORP            
                                                            G2-38          12,299                  04/15/13   08/02/13    DIVINE CONSTRUCTION CORP            
                                                            G2-39          20,734          20,734  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-40          18,354          18,354  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-42          14,019          14,019  04/15/13   08/21/13    DIVINE CONSTRUCTION CORP            
                                                            G2-43          10,055                  04/15/13   08/02/13    DIVINE CONSTRUCTION CORP            
                                                            G2-44           3,769                  04/15/13   07/16/13    DIVINE CONSTRUCTION CORP            
 
10-0338   Reconstruction               0-007-014  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0896   Reconstruction               0-007-015  09/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-01               0                  03/20/13   07/17/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            E1-01               0                  04/02/13   07/01/13    ARRIS CONTRACTING COMPANY INC       
                                                            E1-02H          4,759                  03/20/13   10/16/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            E1-03          14,848                  03/20/13   10/11/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            E1-04          17,834                  03/20/13   10/11/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            E1-05         -10,400                  12/13/13     /  /      Filingeri Electric Contracting Corp.
                                                            E1-06         -19,200                  12/13/13   02/06/14    Filingeri Electric Contracting Corp.
                                                            G1-03          13,608                  04/02/13   07/01/13    ARRIS CONTRACTING COMPANY INC       
                                                            G1-04           8,041                  04/02/13   07/01/13    ARRIS CONTRACTING COMPANY           
                                                            M1-01           3,849                  04/11/13   12/04/13    ASHLEY MECHANICAL INC               
                                                            M1-04          -1,189                  12/13/13   01/24/14    Ashley Mechanical, Inc.             
                                                            M1-09           9,543                  04/11/13   12/04/13    ASHLEY MECHANICAL INC               
 
11-1400   Reconstruction               0-007-016  06/21/11  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0217   Reconstruction               0-007-017  05/15/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            G-01            7,350           7,350  01/27/16   02/04/16    Barrett Roofing                     
                                                            G-01          500,000                  03/02/16   03/11/16    Barrett Roofing                     
                                                            G1-03          -4,381                  11/02/15   12/01/15    Meyer Contracting Group             
 
21-0747   Reconstruction               0-007-018  03/21/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1B27-01       -10,000                  04/18/23   01/02/24    KASSELMAN ELECTRIC CO               
                                                            1B3-01        -10,501                  04/18/23   01/02/24    KEY CONSTRUCTION SERVICES           
                                                            1B6-01          1,755                  04/18/23   12/27/23    SOUTHEAST PLUMBING CORP             
 
22-0335   Reconstruction               0-007-019  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0624   Reconstruction               0-007-020  02/07/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1458   Reconstruction               0-007-021  05/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1862   Reconstruction               0-007-022  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1394SC Visual Structural Inspection 0-007-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Early Learning Center FMLY Smith ES:
90-1128   Reconstruction               0-008-001  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1417   Reconstruction               0-008-007  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0861   Reconstruction               0-008-008  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0993   Reconstruction               0-008-011  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1044   Reconstruction               0-008-012  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-004         13,282                  01/15/03   01/27/03    Meyer Contracting                   
                                                            02-003            811                  01/15/03   01/27/03    Dutchess Mechanical                 
                                                            03-004         16,692                  08/19/03   08/27/03    Ashley Mech.                        
                                                            03-005          7,474                  08/19/03   08/27/03    Ashley Mech.                        
                                                            04-002            320                  01/15/03   01/27/03    Canale Electric                     
 
02-0822   Reconstruction               0-008-013  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0002-004        3,000                  04/12/04     /  /      Meyer Contracting                   
                                                            0002-007         -385                  06/17/04   06/28/04    Meyer Contracting                   
                                                            002-003        -1,185                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-008         1,420                  08/30/04   09/23/04    Meyer Contracting                   
                                                            004-002         1,772                  04/06/04   04/28/04    Palombo Group                       
                                                            006-003         2,987                  03/16/04   04/26/04    Hudson Valley Elec.                 
                                                            006-005        -6,669                  11/19/04   05/02/05    Hudson Valley Construction          
 
03-0307   Reconstruction               0-008-014  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001-006       14,700                  10/28/04   11/19/04    Sun Up Enterprises                  
                                                            001-003        17,500                  10/12/04   10/22/04    Sun Up Enterprises                  
                                                            001-004         8,575                  10/18/04   10/26/04    Sun Up Enterprises                  
                                                            001-005         9,801                  10/18/04   10/26/04    Sun Up Enterprises                  
                                                            001-007         8,240                  11/05/04   11/19/04    Sun Up Enterprise                   
                                                            001-008         5,825                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Son                   
                                                            005-011         2,261                  06/28/05     /  /      Cb strain and Son                   
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son Inc               
                                                            006-027         3,582                  06/08/06   08/24/06    Hudson Valley Electrical            
                                                            2.4-024        10,539                  06/29/06   07/24/06    Glomar Construction                 
 
13-0218   Reconstruction               0-008-015  05/15/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-02         -18,152                  11/02/15   12/01/15    Hudson Valley EC&M, Inc.            
 
13-1535   Reconstruction               0-008-017  07/31/14  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1691   Reconstruction               0-008-021  06/18/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            6,368                  12/15/21   10/11/22    Weatherproof Tech Inc               
 
21-0748   Reconstruction               0-008-022  03/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0336   Reconstruction               0-008-023  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1863   Reconstruction               0-008-024  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Middle School:
91-0862   Reconstruction               0-015-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0483   Reconstruction               0-015-004  02/15/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1418   Reconstruction               0-015-005  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1065   Reconstruction               0-015-006  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0947   Reconstruction               0-015-007  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0598   Reconstruction               0-015-008  02/26/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1031   Reconstruction               0-015-009  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0994   Reconstruction               0-015-011  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1045   Reconstruction               0-015-012  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-002         13,748                  01/15/03   01/27/03    Ashley Mechanical                   
                                                            04-003          3,557                  02/24/03   03/13/03    Canale Electric                     
 
02-0823   Reconstruction               0-015-013  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-003        -1,186                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004         3,000                  04/15/04   04/16/04    Meyer Contracting                   
                                                            002-005           823                  04/05/04   04/07/04    Meyer Contracting                   
                                                            002-006         2,446                  04/24/06   04/24/06    Meyer Contracting Corp.             
                                                            002-008         1,440                  08/30/04   09/23/04    Meyer Contracting                   
                                                            002-010        12,197                  10/12/04   10/18/04    Meyer Contracting                   
                                                            006-002        19,493                  03/05/04   04/26/04    Hudson Valley Elec.                 
                                                            006-003         2,989                  03/16/04   04/26/04    Hudson Valley Elec.                 
                                                            007-001        -7,827                  01/14/03   03/09/04    Sheen and Shine Ent.                
 
03-0308   Reconstruction               0-015-014  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004-004         2,500                  03/23/06   04/20/06    DUTCHESS MECHANICAL                 
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-015           879                  09/12/05   09/20/05    Cb Strain and Son                   
                                                            006-008           710                  03/21/05   01/03/06    Hudson Valley Electrical            
                                                            006-026         1,942                  04/25/06     /  /      Hudson Valley Electrical            
                                                            007-003         2,073                  11/02/05   12/09/05    Buffalo Hotel supply                
                                                            2.4-013        -2,422                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-020        13,221                  09/26/05     /  /      Glomar Construction                 
                                                            2.4-025        -1,750                  06/29/06   07/24/06    Glomar Construction                 
 
10-0897   Reconstruction               0-015-015  07/25/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -8,000                  04/01/13   07/01/13    SEA BREEZE GENERAL CONSTRUCTION INC 
                                                            ARW01               0                  04/11/13   07/01/13    ARROW STEEL WINDOW CORP             
                                                            E1-02G          4,759                  03/20/13   10/16/13    FILINGERI ELECTRIC CONTRACTING CORP 
                                                            G1-07          -5,833                  12/13/13   02/06/14    Arris Contracting Company, Inc.     
                                                            P1-02           5,994                  04/11/13   10/16/13    PEARL RIVER PLUMB/HEAT/ELECT INC    
                                                            P1-03           7,223                  04/11/13   10/16/13    PEARL RIVER PLUMB/HEAT/ELECT INC    
                                                            P1-04          21,782                  04/11/13   10/16/13    PEARL RIVER PLUMB/HEAT/ELECT INC    
                                                            P1-05          13,736                  04/11/13   10/16/13    PEARL RIVER PLUM/HEAT/ELECT INC     
                                                            P1-07           4,256                  04/11/13   10/16/13    PEARL RIVER PLUMB/HEAT/ELECT INC    
                                                            eBR02               0                  04/01/13   07/01/13    SEA BREEZE GENERAL CONSTRUCTION INC 
 
10-0340   Reconstruction               0-015-016  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0866   Reconstruction               0-015-019  02/19/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0196   Reconstruction               0-015-020  11/16/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -516                  11/17/22   09/19/23    OCS INDUSTRIES INC                  
 
21-0749   Reconstruction               0-015-021  03/21/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1B2-01         52,577                  04/18/23     /  /      WEATHERPROOFING TECH                
                                                            1B2-01.2       -4,073                  04/18/23   01/02/24    WEATHERPROOFING TECH                
 
22-0337   Reconstruction               0-015-022  12/15/22  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1864   Reconstruction               0-015-023  11/22/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1242   Reconstruction               0-015-024  03/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1395SC Visual Structural Inspection 0-015-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building Demolition:
92-0831   Reconstruction               1-003-001  03/31/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1046   Reconstruction               1-003-002  06/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0341   Reconstruction               1-003-004  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1689   Reconstruction               1-003-005  10/07/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Clinton Elem. Storage Bldg.:
91-0863   New Construction             2-012-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Morse Elem. Storage Shed:
91-0864   New Construction             2-013-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Shops:
10-0342   Reconstruction               5-009-002  06/27/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Building @ HS:
13-0219   New Construction             7-023-001  05/15/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
01-0544   Reconstruction               7-999-002  01/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,883                  10/22/02   10/24/02    NEC Business Network Solutions      
                                                            2               8,296                  03/17/03   06/02/03    NEC Business Network Solutions      
 
22-0461   Reconstruction               7-999-003  12/21/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nativity School Building:
01-1370   Reconstruction               8-019-L01  05/29/02  NO CHANGE ORDERS ON ELECTRONIC FILE

ARLINGTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-16-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Arthur S. May Elem School:
90-0817   Reconstruction               0-002-005  02/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0781   Reconstruction               0-002-006  02/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1258   Reconstruction               0-002-007  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1415   Reconstruction               0-002-008  06/21/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1519   Reconstruction               0-002-009  07/06/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1463   Reconstruction               0-002-010  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0349   Reconstruction               0-002-011  05/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02          17,340                  12/13/04   12/23/04    William Manfredi Construction       
                                                            GC-03           9,800                  12/13/04   12/23/04    William Manfredi Construction       
                                                            GC-04          16,000                  12/13/04   12/23/04    William Manfredi Construction       
                                                            GC-06          17,125                  12/13/04   12/23/04    William Manfredi Construction       
                                                            PC-01         -10,000                  10/24/05   10/27/05    dutchess Mechanical                 
 
06-0390   Reconstruction               0-002-012  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-08       -3,254                  08/07/09   11/12/09    P&D ELECTRIC OF HUDSON VALLEY INC   
                                                            CO-GC-01      -35,000                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-GC-06        5,632                  05/20/09   05/28/13    FERRARI & SONS INC                  
                                                            CO-MC-10        1,055                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            EC-001         20,137                  01/23/08   04/04/08    P&D ELECTRIC OF HUDSON VALLEY       
                                                            SC-01         -68,000                  06/04/09   07/29/09    A. COLARUSSO & SON INC              
                                                            SC-02         -10,000                    /  /     07/29/09    A. Colarusso & son                  
 
14-0941   Reconstruction               0-002-013  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            7               1,723                  08/22/16   09/30/16    Hudson Valley Door and Hardware LLC 
 
14-0367   Reconstruction               0-002-014  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0848   Reconstruction               0-002-015  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1327   Reconstruction               0-002-016  06/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-2-01       -16,000                  11/25/19   12/04/19    A TO Z COATINGS, INC.               
 
02-2085FP Reconstruction               0-002-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXRaymondAveSch-Sold06/2020.NoStud14:
90-1742   Reconstruction               0-003-003  08/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1475   Reconstruction               0-003-004  06/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0783   Reconstruction               0-003-005  04/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1587   Reconstruction               0-003-006  08/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1461   Reconstruction               0-003-008  05/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1467   Reconstruction               0-003-009  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0350   Alterations                  0-003-010  05/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            site 3         -5,000                  05/20/04   05/27/04    Blacktop Maintenance                
                                                            site2          29,380                  05/20/04   05/27/04    Blacktop Maintenance                
 
06-0391   Reconstruction               0-003-011  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-06       -1,200                  08/07/09   11/12/09    P&D ELECTRIC OF HUDSON VALLEY INC   
                                                            CO-GC-04       -1,980                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-MC-08       -2,725                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-14       15,305                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
 

          Overlook Elementary School:
90-0782   Reconstruction               0-004-003  02/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1743   Reconstruction               0-004-006  08/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1461   Reconstruction               0-004-009  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0392   Reconstruction               0-004-010  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-04          290                  05/20/09   11/12/09    P&D ELECTRIC OF HUDSON VALLEY INC   
                                                            CO-MC-13        8,660                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-16        7,158                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-RC-09        5,999                  11/10/09   05/28/13    NEEDHAM ROOFING INC                 
                                                            CO-RC-10         -806                  11/10/09   12/28/09    NEEDHAM ROOFING INC                 
                                                            CO-RC-12       -3,165                  11/10/09   12/28/09    NEEDHAM ROOFING INC                 
                                                            CO-RC-13       -3,559                  11/10/09   12/28/09    NEEDHAM ROOFING INC                 
                                                            FT-CO1         -9,155                  07/11/13   03/04/14    S&O Construction Services, Inc.     
                                                            RC-2          -14,769                  12/11/07   01/09/08    Needham Roofing,Inc.                
 
14-0942   Reconstruction               0-004-011  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1               1,292                  02/01/16   04/15/16    HUDSON VALLEY DOOR                  
                                                            1               1,292                  02/01/16     /  /      HUDSON VALLEY DOOR                  
 
14-0368   Reconstruction               0-004-012  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0849   Reconstruction               0-004-014  10/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-1-01        -8,005                  01/22/20   02/25/20    S&L PLUMBING & HEATING CORP.        
 
22-1760   Reconstruction               0-004-015  04/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          LaGrange Elementary School:
90-0783   Reconstruction               0-005-003  02/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0818   Reconstruction               0-005-008  02/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1744   Reconstruction               0-005-009  08/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1500   Reconstruction               0-005-010  07/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0954   Reconstruction               0-005-012  05/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0393   Reconstruction               0-005-013  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-02        1,088                  05/20/09   11/12/09    P&D ELECTRIC OF HUDSON VALLEY       
                                                            CO-MC-12        1,934                  09/15/10     /  /      C.B. STRAIN & SON INC               
                                                            RC-04         -15,014                  12/11/07   01/09/08    Needham Roofing,Inc.                
 
14-0369   Reconstruction               0-005-014  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Beekman Elementary School:
92-1501   Reconstruction               0-006-006  07/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1466   Reconstruction               0-006-008  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0394   Reconstruction               0-006-009  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-07       -4,500                  08/07/09   11/12/09    P&D ELECTRIC OF HUDSON VALLEY INC   
                                                            SC-04           9,791                  04/18/13   11/25/13    A. COLARUSSO & SON INC              
                                                            SC-05           8,842                  04/18/13   07/16/13    A. COLARUSSO & SON INC              
                                                            SC-06             959                  04/18/13   07/09/13    A. COLARUSSO & SON INC              
 
10-0208   Reconstruction               0-006-010  12/13/10  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1039   Additions and Alterations    0-006-011  05/20/16  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0943   Reconstruction               0-006-012  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            6                  76                  08/22/16   09/30/16    Hudson Valley Door and Hardware LLC 
 
14-0370   Reconstruction               0-006-013  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0850   Reconstruction               0-006-014  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Traver Road Primary:
90-0784   Reconstruction               0-007-006  02/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1464   Reconstruction               0-007-009  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0395   Reconstruction               0-007-010  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-EC-03        3,146                  05/20/09   11/12/09    P&D ELECTRIC OF HUDSON VALLEY INC   
                                                            CO-EC-05          360                  05/20/09   11/12/09    P&D ELECTRIC OF HUDSON VALLEY INC   
                                                            CO-GC-05       -7,920                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-GC-11       -2,840                  06/02/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-GC-12       -5,435                  06/02/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-RC-08       -4,885                  11/10/09   12/28/09    NEEDHAM ROOFING INC                 
                                                            RC-05          -8,489                  12/11/07   01/09/08    Needham Roofing,Inc.                
 
10-0207   Reconstruction               0-007-011  09/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            12,000                  01/22/14   03/04/14    Mengler Mechanical Inc.             
                                                            002            10,500                  01/22/14   03/04/14    Mengler Mechanical, Inc.            
                                                            003             3,500                  01/22/14   03/04/14    Mengler Mechanical, Inc.            
                                                            004            18,000                  01/22/14   03/04/14    Mengler Mechanical, Inc.            
 
14-0944   Reconstruction               0-007-012  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4                 197                  08/22/16   09/30/16    Hudson Valley Door                  
 
14-0371   Reconstruction               0-007-013  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0851   Reconstruction               0-007-014  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Arlington HS (frmrly North CampusHS):
90-0785   Reconstruction               0-008-004  02/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0819   Reconstruction               0-008-006  02/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0475   Additions and Alterations    0-008-007  12/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1349   Reconstruction               0-008-008  07/27/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0839   Additions and Alterations    0-008-009  06/21/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-AC-01       -1,800                  01/23/08   03/28/08    NIRAM  INC                          
                                                            SC-01         -35,000                  01/25/08   08/06/08    AROLD PAVING COMPANNY               
                                                            SC-02           6,000                  05/20/08   08/07/08    AROLD PAVING COMPANY, INC.          
                                                            SC-03         -30,000                  05/20/08   08/04/08    AROLD PAVING COMPANY, INC.          
                                                            SC-04           9,030                  05/20/08   08/04/08    AROLD PAVING COMPANY, INC.          
                                                            SC-05           4,260                  05/20/08   09/29/08    AROLD PAVING COMPANY, INC.          
 
07-0426   Reconstruction               0-008-010  12/26/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AVC-01           -620                  05/30/13   06/13/14    Filingeri Electrical Contracting Cor
                                                            CO CW-12        1,871                  01/25/10   02/26/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-14       37,562                  02/03/10   04/15/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-15        7,422                  06/06/11   06/10/11    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-16        4,393                  06/06/11   06/10/11    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-17        2,508                  06/06/11   06/10/11    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-18       -6,331                  06/06/11   06/10/11    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-19        4,750                  06/06/11   06/10/11    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-20        1,259                  06/06/11   06/10/11    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO CW-21        6,170                  06/06/11   06/10/11    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO EC-02        9,881                  01/25/10   02/26/10    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-03        9,079                  01/25/10   02/26/10    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-04        9,834                  01/25/10   02/26/10    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-06        8,935                  01/25/10   02/26/10    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-07       17,931                  01/25/10   02/26/10    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-15       16,733                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-16        6,352                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-17       15,109                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-18       11,008                  05/17/11   06/03/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-19        9,165                  05/17/11   06/03/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-20       10,632                  05/17/11   06/03/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-21       17,740                  05/17/11   06/03/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-22          983                  05/17/11   06/03/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-23        2,602                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONSTRUCTION CO
                                                            CO EC-24        7,118                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING COR
                                                            CO EC-25        9,848                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-26        2,685                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO EC-27        3,021                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO GC-39        1,146                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-40        6,870                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-41       34,484                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-42        3,244                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-57        8,275                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-58       23,475                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-62       20,536                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-63       25,353                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-64        4,468                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-65        5,920                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-66        3,638                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-67        8,461                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-68        4,759                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO GC-74          957                  07/25/11   09/21/11    FERRARI & SONS INC                  
                                                            CO GC-75        9,786                  07/25/11   09/21/11    FERRARI & SONS INC                  
                                                            CO KC-01       -5,680                  04/09/10   06/16/10    BUFFALO HOTEL SUPPLY COMPANY INC    
                                                            CO PC 08        1,090                  07/25/11   08/12/11    DUTCHESS MECHANICAL INC             
                                                            CO PC 09        2,341                  07/25/11   08/12/11    DUTCHESS MECHANICAL INC             
                                                            CO PC 10        6,179                  07/25/11   06/20/19    DUTCHESS MECHANICAL INC             
                                                            CO PC 11       -1,810                  07/25/11   08/12/11    DUTCHESS MECHANICAL INC             
                                                            CO PC 12         -986                  07/11/13   06/13/14    Dutchess Mechanical Inc.            
                                                            CO PC-04       38,166                  07/25/11   08/12/11    DUTCHESS MECHANICAL INC             
                                                            CO PC-05       14,953                  07/25/11   08/12/11    DUTCHESS MECHANICAL INC             
                                                            CO PC-06        9,902                  07/25/11   06/20/19    DUTCHESS MECHANICAL INC             
                                                            CO PC-07       15,442                  07/25/11   06/20/19    DUTCHESS MECHANICAL INC             
                                                            CO SC-25        2,263                  04/05/11   04/21/11    AROLD CONSTRUCTION COMPANY INC      
                                                            CO SC-26        6,085                  04/05/11   04/21/11    AROLD CONSTRUCTION COMPANY INC      
                                                            CO SC-27        3,780                  04/05/11   04/21/11    AROLD CONSTRUCTION COMPANY INC      
                                                            CO SC-28         -674                  04/05/11   04/21/11    AROLD CONSTRUCTION COMPANY INC      
                                                            CO SC-29          630                  04/05/11   04/21/11    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-01          -2,835                  01/03/13   05/28/13    D & S Fire Protection               
                                                            CO-AA-01     -209,000                  05/26/09   08/31/09    DSA SERVICES INC                    
                                                            CO-AA-02       -7,500                  05/26/09   08/31/09    DSA SERVICES INC                    
                                                            CO-AA-03       18,494                  05/26/09   08/31/09    DSA SERVICES INC                    
                                                            CO-AA-04      563,000                  07/11/13   07/19/13    DSA Services, Inc.                  
                                                            CO-AA-05      -10,000                  07/11/13   07/19/13    DSA Services, Inc.                  
                                                            CO-CC-01      -16,000                  01/25/10   03/05/10    EUGENE DILORENZO INC                
                                                            CO-CC-02       -2,000                  01/25/10   05/31/13    EUGENE DILORENZO INC                
                                                            CO-CC-03        8,065                  04/11/11   04/29/11    EUGENE DILORENZO INC                
                                                            CO-CC-04        4,710                  04/11/11   04/29/11    EUGENE DILORENZO INC                
                                                            CO-CW-01       73,242                  05/30/13   05/31/13    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-02       79,615                  05/30/13   05/31/13    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-03        1,964                  01/25/10   03/05/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-04        2,214                  01/25/10   03/05/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-05        2,207                  01/25/10   03/05/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-06        1,916                  01/25/10   03/05/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-07       49,967                  01/25/10   03/05/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-08        6,933                  01/25/10   02/26/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-09        7,659                  01/25/10   02/26/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-10        3,043                  01/25/10   02/26/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-11        2,488                  01/25/10   02/26/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-CW-13        1,999                  01/25/10   02/26/10    AFI GLASS & ARCHITECTURAL METAL INC 
                                                            CO-EC-01        1,938                  01/25/10   02/26/10    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-05        9,531                  01/25/10   02/26/10    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-08       24,899                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-09       23,932                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-10       24,835                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-11       20,528                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-12       21,509                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-13       22,268                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-EC-14       21,043                  04/11/11   04/29/11    FILINGERI ELECTRICAL CONSTRUCTION   
                                                            CO-EC-15       16,733                  04/11/11     /  /      FILINGERI ELECTRICAL CONTRACTING    
                                                            CO-GC-01      -12,000                  05/26/09   07/28/09    FERRARI & SONS INC                  
                                                            CO-GC-02      -12,177                  05/26/09   07/28/09    FERRARI & SONS INC                  
                                                            CO-GC-03       -5,068                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-04       16,269                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-05       27,990                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-06       15,261                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-07        1,407                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-08       16,441                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-09        1,617                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-10       15,040                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-11        4,631                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-12        1,448                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-13        4,678                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-14        4,339                  10/13/09   11/17/09    FERRARI & SONS INC                  
                                                            CO-GC-15       48,736                  11/10/09   02/26/10    FERRARI & SONS INC                  
                                                            CO-GC-16        5,408                  11/10/09   02/26/10    FERRARI & SONS INC                  
                                                            CO-GC-17        3,125                  11/10/09   02/26/10    FERRARI & SONS INC                  
                                                            CO-GC-18       11,400                  11/10/09   02/26/10    FERRARI & SONS INC                  
                                                            CO-GC-19       25,563                  02/03/10   04/15/10    FERRARI & SONS INC                  
                                                            CO-GC-20        9,923                  04/06/10   06/15/10    FERRARI & SONS INC                  
                                                            CO-GC-21        2,473                  04/06/10   06/15/10    FERRARI & SONS INC                  
                                                            CO-GC-22        5,063                  04/06/10   06/15/10    FERRARI & SONS INC                  
                                                            CO-GC-23        5,627                  04/06/10   06/15/10    FERRARI & SONS INC                  
                                                            CO-GC-24       10,341                  04/06/10   06/15/10    FERRARI & SONS INC                  
                                                            CO-GC-25        2,584                  04/06/10   06/15/10    FERRARI & SONS INC                  
                                                            CO-GC-26        2,391                  04/06/10   06/15/10    FERRARI & SONS INC                  
                                                            CO-GC-27        3,008                  04/09/10   06/16/10    FERRARI & SONS INC                  
                                                            CO-GC-28       28,707                  04/09/10   06/16/10    FERRARI & SONS INC                  
                                                            CO-GC-29       10,593                  05/12/10   07/21/10    FERRARI & SONS INC                  
                                                            CO-GC-30       16,479                  05/12/10   07/21/10    FERRARI & SONS INC                  
                                                            CO-GC-31       22,625                  05/12/10   07/21/10    FERRARI & SONS INC                  
                                                            CO-GC-32       10,557                  05/12/10   07/21/10    FERRARI & SONS INC                  
                                                            CO-GC-33       23,250                  05/12/10   07/20/10    FERRARI & SONS INC                  
                                                            CO-GC-34        6,904                  05/12/10   07/20/10    FERRARI & SONS INC                  
                                                            CO-GC-35        2,975                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-36        2,912                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-37       56,900                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-38        9,097                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-43        2,967                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-44        4,640                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-45      -31,546                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-46        2,393                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-47          740                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-48       32,078                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-49        5,634                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-50        4,620                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-51       14,023                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-52        6,077                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-53        1,109                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-54        6,276                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-55        2,872                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-56        5,610                  04/11/11   04/29/11    FERRARI & SONS INC                  
                                                            CO-GC-59      136,916                  05/02/13   11/22/13    FERRARI & SONS INC                  
                                                            CO-GC-69        6,077                  07/25/11   09/21/11    FERRARI & SONS INC                  
                                                            CO-GC-70        1,799                  07/25/11   05/31/13    FERRARI & SONS INC                  
                                                            CO-GC-71        3,802                  07/25/11   09/21/11    FERRARI & SONS INC                  
                                                            CO-GC-72        7,639                  07/25/11   09/21/11    FERRARI & SONS INC                  
                                                            CO-GC-73          942                  07/25/11   09/21/11    FERRARI & SONS INC                  
                                                            CO-MC-01     -166,000                  05/26/09   09/22/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-02      -32,000                  05/26/09   09/22/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-03      -19,640                  05/26/09   09/22/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-04      -41,000                  05/26/09   09/22/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-05        5,166                  08/11/09   01/08/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-06        1,332                  08/11/09   01/08/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-07       14,584                  08/11/09   01/08/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-08        3,996                  08/11/09   01/08/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-09        3,609                  08/11/09   01/08/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-10        4,276                  08/11/09   01/08/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-11        2,790                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-12       19,898                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-13       25,185                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-14        3,996                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-15        4,649                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-16        4,409                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-17          600                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-18        3,241                  10/13/09   11/17/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-19       38,550                  11/10/09   12/04/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-20       21,806                  02/03/10   09/14/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-21        8,533           1,280  02/03/10   02/18/11    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-22        1,629                  02/03/10   09/14/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-23        2,688                  02/03/10   09/14/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-24        2,695                  02/03/10   09/14/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-25        4,862                  02/03/10   09/14/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-26        4,536                  02/03/10   09/14/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-27        9,981                  02/03/10   09/14/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-28        2,208                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-29        3,744                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-30        4,351                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-31        2,519                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-32       29,059                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-33        6,331                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-34         -291                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-35          121                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-36          587                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-37          816                  06/16/10   08/06/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-38      -25,189                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-39        3,092                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-40          401                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-41       14,417                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-42        2,153                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-43        2,593                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-44        7,583                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-45        3,533                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-46       -3,111                  04/23/13   06/13/14    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-47       18,961                  07/27/11   08/12/11    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-48        2,185                  07/27/11   08/12/11    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-49        6,650                  07/27/11   08/12/11    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-MC-50        2,771                  07/27/11   06/19/19    GENERAL MECHANICAL SYSTEMS INC      
                                                            CO-PC-01        3,980                  05/26/09   09/22/09    DUTCHESS MECHANICAL INC             
                                                            CO-PC-02        2,008                  05/26/09   06/19/19    DUTCHESS MECHANICAL INC             
                                                            CO-PC-03        8,100                  05/26/09   09/22/09    DUTCHESS MECHANICAL INC             
                                                            CO-RC-01      -30,610                  10/13/09   11/17/09    WB ROOFING & SHEETMETAL INC         
                                                            CO-RC-02      -19,640                  10/13/09   11/17/09    WB ROOFING & SHEETMETAL INC         
                                                            CO-RC-03       36,300                  10/13/09   11/17/09    WB ROOFING & SHEETMETAL INC         
                                                            CO-RC-04        3,646                  10/13/09   11/17/09    WB ROOFING & SHEETMETAL INC         
                                                            CO-RC-05        2,492                  10/13/09   11/17/09    WB ROOFING & SHEETMETAL INC         
                                                            CO-RC-06        1,524                  10/13/09   11/17/09    WB ROOFING & SHEETMETAL INC         
                                                            CO-RC-07        7,944                  10/13/09   11/17/09    WB ROOFING & SHEETMETAL INC         
                                                            CO-RC-08        2,166                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-09       15,216                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-10       19,035                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-11        3,689                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-12        1,301                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-13        2,079                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-14        2,408                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-15       21,410                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-16       13,608                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-17        2,104                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-18       15,112                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-19       10,529                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-20          502                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-21      -30,000                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-22       -1,799                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-23       -2,185                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-24        5,515                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-25        5,928                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-26        4,023                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-27        3,197                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-28        3,722                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-29        2,125                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-30        4,128                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-31        4,640                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-RC-32        5,057                  07/22/11   09/13/11    WB ROOFING & SHEET METAL INC        
                                                            CO-SC-01       37,926                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-02        4,924                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-03       74,480                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-04        4,200                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-05        7,089                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-06        2,152                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-07        1,282                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-08        4,277                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-09        9,121                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-10        1,744                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-11        7,053                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-12        1,204                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-13        6,112                  05/26/09   07/28/09    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-14        2,748                  06/02/09   09/01/09    AROLD CONSTRUCTION CO., INC.        
                                                            CO-SC-15        1,300                  06/02/09   09/01/09    AROLD CONSTRUCTION CO., INC.        
                                                            CO-SC-16        4,544                  06/02/09   09/01/09    AROLD CONSTRUCTION CO., INC.        
                                                            CO-SC-17        1,727                  01/25/10   03/05/10    AROLD PAVING COMPANY INC            
                                                            CO-SC-18          721                  01/25/10   03/05/10    AROLD PAVING COMPANY INC            
                                                            CO-SC-19        3,256                  01/25/10   03/05/10    AROLD PAVING COMPANY INC            
                                                            CO-SC-20        1,481                  01/25/10   03/05/10    AROLD PAVING COMPANY INC            
                                                            CO-SC-21          869                  01/25/10   03/05/10    AROLD PAVING COMPANY INC            
                                                            CO-SC-22        2,100                  01/25/10   03/05/10    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-23        5,862                  01/25/10   03/05/10    AROLD CONSTRUCTION COMPANY INC      
                                                            CO-SC-24       17,970                  02/03/10   04/15/10    AROLD CONSTRUCTION COMPANY INC      
                                                            COGC-60         9,933                  05/02/13   06/28/13    Ferrari & Sons, Inc.                
                                                            COGC-61        14,359                  07/11/13   07/19/13    Ferrari & Sons, Inc.                
                                                            COSEAT01       -4,800                  05/17/11   06/03/11    PROFESSIONAL FURNISHINGS & EQUIPMENT
                                                            COTSC-01       -4,700                  05/12/10   07/20/10    AV SOLUTIONS                        
                                                            COTSC-02       19,432                  07/11/13   01/31/14    Business Methods, Inc.              
                                                            Case-01       -19,200                  06/13/14   07/10/14    Health & Educational Equipment, Corp
                                                            EC-28          -1,286                  05/30/13   06/13/14    Filingeri Electrical Contracting Cor
                                                            KC-02          -2,116                  05/30/13   07/19/13    Buffalo Hotel Supply Comapny, Inc.  
                                                            KC-03         -43,767                  05/30/13   07/19/13    Buffalo hotel Supply Company, Inc.  
                                                            LC-01          -2,822                  05/30/13   07/19/13    The Telcar Group                    
                                                            RC-33           5,278                  05/30/13   07/19/13    WB Roofing & Sheet Metal, Inc.      
                                                            RC-34           2,436                  05/30/13   07/19/13    WB Roffing & Sheet Metal, Inc.      
                                                            RC-35           3,055                  05/30/13   08/09/13    WB ROOFING & SHEET METAL INC        
                                                            RC-36            -486                  05/30/13   07/19/13    WB Roofing & Sheet Metal, Inc.      
                                                            RC-37           3,873                  05/30/13   07/19/13    WB Roofing & Sheet Metal            
                                                            RC-38           2,558                  05/30/13   07/19/13    WB Roofing & Sheet Metal, Inc.      
                                                            RC-39           1,847                  05/30/13   07/19/13    WB Roof & Sheet Metal, Inc.         
                                                            RC-40          -1,439                  05/30/13   07/19/13    WB Roof & Sheet Metal, Inc.         
                                                            TC-01            -942                  05/30/13   07/19/13    Theatrical Services & Supplies, Inc.
                                                            TC-02          -7,901                  05/30/13   07/19/13    Theatrical Services & Supplies, Inc.
                                                            TC-03          -3,500                  05/30/13   07/19/13    Theatrical Services & Supplies, Inc.
 
09-1450   Alterations                  0-008-011  08/05/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,850                  12/21/10   01/20/11    SOLAR LIBERTY ENERGY SYSTEMS INC    
                                                            EC-02          -3,251                  03/11/11   03/28/11    SOLAR LIBERTY ENERGY SYSTEMS INC    
 
12-0043   Reconstruction               0-008-012  10/19/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          45,000                  07/31/13   02/19/14    Lighthouse Solar                    
 
14-0945   Reconstruction               0-008-013  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1               2,179                  11/04/15   11/24/15    Unitech Services                    
                                                            1               2,179                  11/04/15   12/02/15    Unitech Services                    
                                                            1               2,179                  11/04/15   12/02/15    Unitech Servics                     
                                                            10            -26,696                  10/27/17   11/10/17    Hudson Valley Door and Hardware, LLC
                                                            2               7,483                  12/04/17   12/26/17    Hudson Valley Door and Hardware LLC 
                                                            3               4,722                  08/22/16   09/30/16    Hudson Valley Door                  
                                                            3              37,752                  01/11/16   01/27/16    Universe Services                   
                                                            3              37,752                  11/17/15   01/27/16    Unitech Services                    
                                                            6              -3,075                  09/19/16   12/19/16    Unitech Services Group              
                                                            9               8,490                  08/22/16   09/30/16    Hudson Valley Door and Hardware LLC 
 
14-0372   Reconstruction               0-008-014  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0852   Reconstruction               0-008-015  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1328   Reconstruction               0-008-016  06/08/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1-01        21,420                  06/20/19   07/01/19    TITAN ROOFING, INC.                 
                                                            RC-1-02        69,337                  09/16/19   09/24/19    TITAN ROOFING, INC.                 
                                                            RC-1-03         5,056                  11/20/20   02/05/21    TITAN ROOFING, INC.                 
 
18-1227   Reconstruction               0-008-017  04/30/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           1,827                  10/15/20   12/29/20    FOREMOST ELECTRIC CORP.             
                                                            EC-02           1,482                  12/04/20   02/03/21    FOREMOST ELECTRIC COPR.             
                                                            EC-03          -1,199                  02/10/21   04/08/21    FOREMOST ELECTRIC CORP.             
                                                            GC-01           8,143                  08/31/20   11/24/20    FERRARI & SON, INC.                 
                                                            GC-02           5,714                  09/15/20   11/06/20    FERRARI & SON, INC.                 
                                                            GC-03          -1,294                  01/29/21   03/19/21    FERRARI & SONS, INC.                
                                                            PC-01          -2,500                  12/22/20   03/12/21    C. MCGOVERN PLUMBING CORP.          
 
18-1435   Reconstruction               0-008-018  04/30/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1555   Reconstruction               0-008-019  05/22/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-3-01        35,000                  09/19/23     /  /      SUN UP CONSTRUCTION CORP            
 
02-2084FP Reconstruction               0-008-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          LaGrange MS(fmlySouth Campus):
90-0786   Reconstruction               0-009-002  02/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0955   Reconstruction               0-009-004  05/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0351   Reconstruction               0-009-005  05/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           7,724                  12/13/04   12/23/04    JD Parrella Electric                
                                                            EC-02             632                  03/16/05   03/31/05    JD Parella electric                 
                                                            GC-01          20,695                  12/13/04   12/23/04    William Manfredi Construction       
                                                            HC-01          16,540                  03/16/05   03/31/05    CB Strain and Son inc               
                                                            PC-01          -1,902                  03/16/05   03/31/05    Dutchess mechanical                 
                                                            Site 1         59,326                  09/26/03   11/26/03    Blacktop Maintenance                
                                                            site 4         -5,000                  05/20/04   05/27/04    Blacktop Maintenance                
 
06-0396   Reconstruction               0-009-006  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-GC-02       -5,000                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-GC-03       -1,000                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-GC-07        2,600                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-GC-08        1,301                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-GC-09       -4,600                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-MC-01      -19,000                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-03      -10,000                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-04      -20,000                  12/17/10     /  /      C.B. STRAIN & SON INC               
                                                            CO-MC-05       -9,000                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-06       -8,000                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-07      -63,370                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-09         -754                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            RC-01          -4,180                  12/11/07   01/09/08    Needham Roofing,Inc.                
 
14-0946   Reconstruction               0-009-007  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               6,245                  11/17/15   01/05/16    Unitech Services                    
                                                            2               1,084                  08/22/16   09/30/16    Hudson Valley Door and Hardware LLC 
                                                            5              -9,000                  11/17/15   01/27/16    Unitech Services                    
 
14-0373   Reconstruction               0-009-008  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0529   Reconstruction               0-009-009  02/26/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1              15,338                  07/08/16   07/27/16    Milburn Flooring Mills              
 
16-0853   Reconstruction               0-009-010  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1449   Reconstruction               0-009-011  03/22/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1330   Reconstruction               0-009-012  05/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1331   Reconstruction               0-009-013  03/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2081FP Reconstruction               0-009-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Titusville Elementary School:
90-0820   Reconstruction               0-010-005  02/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1465   Reconstruction               0-010-007  10/25/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            07             -6,000                  11/26/01   05/28/02    A. Colarusso & Son                  
                                                            E-01          -16,900                  03/13/02   05/24/02    Canale Elec.                        
                                                            P-02          -22,997                  01/28/02   04/01/02    S&O Const.                          
 
06-0397   Reconstruction               0-010-008  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-GC-10        1,539                  05/20/09   08/13/09    FERRARI & SONS INC                  
                                                            CO-MC-02      -47,000                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-MC-11        3,559                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
                                                            CO-RC-06       21,738                  11/10/09   12/28/09    NEEDHAM ROOFING INC                 
                                                            CO-RC-07      -76,661                  11/10/09   12/28/09    NEEDHAM ROOFING INC                 
                                                            CO-RC-11       -1,539                  11/10/09   12/28/09    NEEDHAM ROOFING INC                 
                                                            RC-03         -14,467                  12/11/07   01/09/08    Needham Roofing,Inc.                
                                                            SC-03           2,416                  04/18/13   07/09/13    A. COLARUSSO & SON INC              
 
14-0947   Reconstruction               0-010-009  03/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0374   Reconstruction               0-010-010  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1481   Reconstruction               0-010-011  03/30/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -2,000                  11/29/17   12/14/17    Jupiter Environmental Services Inc. 
 
16-0854   Reconstruction               0-010-012  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1813   Reconstruction               0-010-013  05/19/17  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2088FP Reconstruction               0-010-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jos.D'Aquanni ElemSch(frmrlyWestRdES:
99-0956   Reconstruction               0-012-005  05/17/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0398   Reconstruction               0-012-006  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-MC-15        9,680                  09/15/10   12/17/10    C.B. STRAIN & SON INC               
 
13-1536   Reconstruction               0-012-007  06/11/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0948   Reconstruction               0-012-008  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            8                 675                  08/22/16   09/30/16    Hudson Valley Door and Hardware LLC 
 
14-0375   Reconstruction               0-012-009  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0855   Reconstruction               0-012-010  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2087FP Reconstruction               0-012-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Noxon Road Elem. School:
99-0957   Reconstruction               0-013-002  05/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-03-R           -864                  03/13/02   04/19/02    Best Roofing of NJ                  
 
06-0399   Reconstruction               0-013-003  02/27/07  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1537   Reconstruction               0-013-004  06/11/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,000                  07/06/15   07/30/15    Suburban Restoration                
 
14-0949   Reconstruction               0-013-005  03/30/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4             -28,000                  01/11/16   01/27/16    Unitech Services                    
                                                            4             -28,000                  01/17/16   01/27/16    Unitech Services                    
 
14-0376   Reconstruction               0-013-006  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0417   Reconstruction               0-013-007  04/12/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,905                  03/01/19   03/15/19    GREEN ACRES EXC. & CONTR. CORP.     
 
16-0856   Reconstruction               0-013-008  10/30/18  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2086FP Reconstruction               0-013-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Union Vale Middle School:
01-0499   New Construction             0-036-001  07/15/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01            -634                  06/14/04   06/25/04    Schumacher Systems                  
                                                            AC-05           1,605                  02/17/05   03/02/05    Schumacher Systems                  
                                                            AE-03          -4,000                  12/09/05   12/15/05    Nickerson Corp                      
                                                            CAS-03         -1,500                  12/09/05   12/15/05    Nickerson Corp                      
                                                            EL-01         -11,012                  05/27/03   06/02/03    Canale Elec.                        
                                                            EL-02             833                  02/04/04   03/03/04    Canale Elec.                        
                                                            EL-03           2,501                  02/06/04   03/12/04    Canale Elec.                        
                                                            EL-05           6,192                  02/06/04   03/19/04    Canale Elec.                        
                                                            EL-07          16,939                  02/04/04   09/08/04    Canale Elec.                        
                                                            EL-09           2,526                  06/14/04   06/25/04    Canale Elec.                        
                                                            EL-11           4,529                  06/14/04   06/25/04    Canale Elec.                        
                                                            EL-12           3,250                  08/13/04   09/28/04    Canale Elec.                        
                                                            EL-14           7,616                  08/13/04   09/28/04    Canale Elec.                        
                                                            EL-17             972                  08/11/04   09/08/04    Canale Elec.                        
                                                            EL-18           1,467                  08/13/04   09/28/04    Canale Elec.                        
                                                            EL-19           8,140                  11/04/04   01/03/05    Canale Elec.                        
                                                            EL-22          15,497                  11/04/04   10/03/05    Canale Elec.                        
                                                            EL-23          -4,445                  03/01/05   06/21/05    Canale Electric Corp                
                                                            EL-25             575                  03/01/05   06/21/05    canale Electric Corp                
                                                            EL-27           7,240                  03/01/05   02/21/07    Canale Electric Corp                
                                                            EL-28             475                  03/01/05   05/02/05    Canale Electric Corp                
                                                            ES-04          -5,000                  12/09/05   07/31/06    Singer Equipment                    
                                                            FS-01           4,400                  06/14/04   06/25/04    Singer Equipment                    
                                                            FS-02          -4,000                  06/06/05   06/29/05    singer Equipment Co                 
                                                            FT-01          -3,500                  08/18/04   09/27/04    Northeast Petroleum Tech            
                                                            GC-01         -17,500                  05/27/03   06/02/03    UW Marx                             
                                                            GC-02           8,739                  07/07/03   07/11/03    UW Marx                             
                                                            GC-03          20,482                  07/07/03   07/11/03    UW Marx                             
                                                            GC-06          13,853                  02/06/04   06/15/04    UW Marx                             
                                                            GC-07          10,090                  02/04/04   06/14/04    UW Marx                             
                                                            GC-09           3,103                  03/12/04   03/15/04    UW Marx                             
                                                            GC-11         -20,850                  03/12/04   03/15/04    UW Marx                             
                                                            GC-12           2,278                  05/10/04   05/14/04    UW Marx                             
                                                            GC-14           2,531                  05/10/04   05/14/04    UW Marx                             
                                                            GC-15           1,780                  05/10/04   05/14/04    UW Marx                             
                                                            GC-18          62,222                  06/14/04   08/13/04    UW Marx                             
                                                            GC-19          28,005          17,952  08/13/04   09/28/04    UW Marx                             
                                                            GC-21          10,597                  08/13/04   09/27/04    UW Marx                             
                                                            GC-22          13,086                  11/04/04   11/19/04    UW Marx                             
                                                            GC-25          25,387                  11/04/04   12/06/04    UW Marx                             
                                                            GC-27         -39,058                  02/17/05   03/02/05    UW Marx inc                         
                                                            GC-29          -3,604                  04/07/05   04/26/05    UW Marx inc                         
                                                            HVAC-01        21,000                  07/07/03   07/11/03    J&M Heating                         
                                                            HVAC-02        -2,278                  01/13/06   06/26/06    J and M heating Air COnd            
                                                            HVAC-04       -10,928                  08/13/04   09/28/04    J&M Heating                         
                                                            HVAC-05         3,370                  08/18/04   09/28/04    J&M Heating                         
                                                            HVAC-07        -6,000                  01/13/06   01/19/06    J and M heating air Cond            
                                                            L-01           -5,535                  05/27/03   06/03/03    Linda Holding                       
                                                            L-01           25,693                  11/04/04   12/06/04    Nickerson Corp                      
                                                            L-2            22,500                  11/26/03   12/04/03    Linda Holding                       
                                                            LO-02           1,750                  12/09/05     /  /      Nickerson corp                      
                                                            LO-03          13,478                  01/11/05   01/25/05    Linda Holding                       
                                                            PA-01          -6,000                  05/27/03   06/03/03    Dutchess Tel Audio                  
                                                            PA-02           6,100                  08/18/04   09/27/04    Dutchess Tel Audio                  
                                                            PA-03          -7,000                  03/01/05   06/21/05    Dutchess tel Audio Inc              
                                                            PL-01          11,670                  07/07/03   07/11/03    S&O Const.                          
                                                            PL-02          14,440                  02/06/04   04/12/04    S&O Const.                          
                                                            PL-04          10,764                  08/13/04   09/28/04    S&O Const.                          
                                                            PS-01           4,400                  06/14/04     /  /      Singer Equipment                    
                                                            PW-02          15,644                  11/04/04   11/19/04    McNamee Const.                      
                                                            PW-04             750                  11/04/04   11/19/04    McNamee Const.                      
                                                            PW-05         -13,550                  08/13/07   08/20/07    KEYSTONE CONSTRUCTION CLERKS & MANAG
                                                            PW-07          37,800                  08/13/07   08/20/07    KEYSTONE CONSTRUCTION CLERKS & MANGE
                                                            RO-01          20,850                  03/12/04   03/15/04    Best Roofing of New Jersey          
                                                            RO-02         -40,604                  08/11/04   09/08/04    Best Roofing of New Jersey          
                                                            RO-05          -2,033                  12/18/06   01/30/07    Best Roofing                        
                                                            RO-06           1,392                  12/18/06   01/30/07    Best Roofing                        
                                                            SAC-01          4,750                  08/18/04   09/27/04    Nickerson Corp                      
                                                            SAC-02            625                  11/04/04   11/19/04    Nickerson Corp                      
                                                            TI-01             592                  06/14/04   06/25/04    Control Network Communications      
                                                            TI-03          -2,584                  12/27/04   01/03/05    Control Network Communications      
                                                            TL-01          -3,750                  05/27/03   06/03/03    Tri-Co Elec.                        
                                                            TL-02             640                  08/18/04   09/28/04    Control Network Communications      
                                                            TL-02          -3,500                  11/04/04   11/29/04    Tri-Co Elec.                        
                                                            TR-01          -5,000                  04/07/05   04/26/05    Sun-UP Enterprises                  
 
14-0950   Reconstruction               0-036-002  03/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0377   Reconstruction               0-036-003  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0857   Reconstruction               0-036-004  10/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-2-01        66,204                  08/21/19   08/23/19    ASHLEY MECHANICAL, INC.             
                                                            PC-2-04        15,895                  07/21/20   09/11/20    ASHLEY MECHANICAL, INC.             
                                                            PC-2-05         3,776                  07/21/20   09/11/20    ASHLEY MECHANICAL, INC.             
                                                            PC-2-08        35,857                  07/21/20   09/11/20    ASHLEY MECHANICAL, INC.             
                                                            PC-2-09         1,347                  01/29/21   03/24/21    ASHLEY MECHANICAL, INC.             
                                                            SC-02         334,300                  06/20/19   06/24/19    PROFEX, INC.                        
                                                            SC-03          34,995                  11/29/19   12/09/19    PROFEX, INC.                        
 
22-1556   Reconstruction               0-036-005  05/22/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-2-01       -34,286                  09/19/23     /  /      SUN UP CONSTRUCTION CORP            
 

          Vail Farm Elementary School:
14-0951   Reconstruction               0-037-002  03/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0378   Reconstruction               0-037-003  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0858   Reconstruction               0-037-004  10/30/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-2-02        66,222                  08/21/19   08/23/19    ASHLEY MECHANICAL, INC.             
                                                            PC-2-03         7,809                  07/21/20   09/10/20    ASHLEY MECHANICAL, INC.             
                                                            PC-2-06         3,776                  07/21/20   09/11/20    ASHLEY MECHANICAL, INC.             
                                                            PC-2-07        43,569                  07/21/20   09/11/20    ASHLEY MECHANICAL, INC.             
                                                            PC-2-10           606                  01/29/21   03/24/21    ASHLEY MECHANICAL, INC.             
                                                            PC-2-11       -10,000                  01/31/22     /  /      Ashley Mech Inc                     
                                                            SC-01          58,000                  06/20/19   06/24/19    PROFEX, INC.                        
 
22-1557   Reconstruction               0-037-005  05/22/23  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC1-01          7,544                  09/19/23     /  /      SUN UP CONTRUSTION CORP             
 

          Storage/Pump House (West Rd):
14-0952   Reconstruction               2-020-001  03/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage House #22:
14-0953   Reconstruction               2-022-001  03/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pump House:
06-0840   Reconstruction               2-023-001  12/26/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          LaGrange Bus Garage:
97-1462   Reconstruction               5-011-002  05/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0379   Reconstruction               5-011-003  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1084   Additions and Alterations    5-011-004  01/31/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          18,664                  01/21/20   02/25/20    O&D ELECTRIC CORP.                  
                                                            EC-02          -1,921                  02/03/20   03/03/20    O&D ELECTRIC CORP.                  
                                                            EC-03           2,352                  08/31/20   11/04/20    O&D ELECTRIC CORP.                  
                                                            EC-04           5,131                  08/31/20   11/04/20    O&D ELECTRIC CORP.                  
                                                            EC-05          -8,249                  08/31/20   11/04/20    O&D ELECTRIC CORP.                  
                                                            EC-06          25,943                  08/31/20   11/04/20    O&D ELECTRIC CORP.                  
                                                            EC-07          15,666                  08/31/20   11/04/20    O&D ELECTRIC CORP.                  
                                                            EC-08           2,561                  11/16/20   02/12/21    O&D ELECTRIC CORP.                  
                                                            EC-09           2,410                  11/16/20   02/12/21    O&D ELECTRIC CORP.                  
                                                            EC-10          14,170                  12/22/20   03/12/21    O&D ELECTRIC CORP.                  
                                                            EC-11           9,574                  12/22/20   03/12/21    O&D ELECTRIC CORP.                  
                                                            EC-12            -819                  12/22/20   03/12/21    O&D ELECTRIC CORP.                  
                                                            EC-13          10,988                  04/21/21   08/04/21    O&D ELECTRIC CORP.                  
                                                            EC-14          22,447                  05/04/21   08/27/21    O&D ELECTRIC CORP.                  
                                                            EC-15            -216                  05/04/21   08/27/21    O&D ELECTRIC CORP.                  
                                                            GC-01          -7,402                  12/04/20   03/09/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            GC-02          -1,312                  12/22/20   03/31/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            GC-03            -634                  03/25/21   06/22/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            GC-04          -4,940                  03/25/21   06/22/21    STANDBACK GENERAL CONTRATORS, LLC   
                                                            GC-05          -4,610                  03/25/21   06/22/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            GC-06          -1,680                  03/25/21   06/22/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            GC-07          -6,002                  03/25/21   06/22/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            GC-08          38,518                  10/06/21   12/02/22    Standback Gen Contractors, LLC      
                                                            MC-01          15,079                  08/31/20   11/04/20    DJ HEATING & AIR CONDITIONING, INC. 
                                                            MC-02           6,240                  12/04/20   02/03/21    DJ HEATING & AIR CONDITIONING, INC. 
                                                            PC-01          -8,535                  01/21/20   02/25/20    ASHLEY MECHANICAL, INC.             
                                                            PC-02           3,080                  12/04/20   02/03/21    ASHLEY MECHANICAL, INC.             
                                                            PC-03           2,741                  12/04/20   02/03/21    ASHLEY MECHANICAL, INC.             
                                                            PC-04          13,832                  05/04/21   08/27/21    ASHLEY MECHANICAL, INC.             
                                                            PC-05         -10,570                  10/06/21   11/16/22    Ashley Mech, Inc                    
                                                            PC-06          -2,800                  10/06/21   11/16/22    Ashley Mech, Inc                    
                                                            PC-07            -925                  10/06/21   11/16/22    Ashley Mech, Inc                    
                                                            SC-01          27,392                  10/09/20   02/08/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-02          57,485                  10/09/20   02/08/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-03          32,507                  12/04/20   03/09/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-04          25,193                  12/04/20   03/09/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-05          34,917                  12/22/20   03/31/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-06         -11,200                  05/04/21   08/05/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-07          -1,883                  05/04/21   08/05/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-08          -1,140                  05/04/21   08/05/21    STANDBACK GENERAL CONTRACTORS, LLC  
                                                            SC-09          -4,397                  06/04/21   01/13/22    Standback General Contractors       
                                                            SC-10         -11,084                  06/04/21   01/13/22    Standback General Contractors       
                                                            SC-11           4,370                  06/04/21   01/13/22    Standback General Contractors       
                                                            SC-12          10,985                  06/14/21   03/15/22    Standback General Contractors       
                                                            SC-13           4,744                  06/14/21   03/15/22    Standback General Contractors       
                                                            SC-14          37,123                  10/06/21   12/02/22    Standback Gen Contractors, LLC      
                                                            SC-15         -19,940                  11/04/21   12/13/22    Standback Gen Contractors, LLC      
                                                            SC-16          -6,772                  02/16/22   02/14/23    Standback Gen Contrs LLC            
 

          Arlington Bus Garage & Bldgs&Grnds:
97-1463   Reconstruction               5-014-002  05/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1462   Reconstruction               5-014-003  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0380   Reconstruction               5-014-004  06/24/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1085   Additions and Alterations    5-014-005  01/31/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXTucker Bus Garage:
09-1206   Reconstruction               5-039-L01  06/02/10  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1573   Reconstruction               5-039-L02  09/30/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Storage/Concession:
98-1468   New Construction             7-038-001  08/01/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
18-1228   New Construction             7-041-001  04/30/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
98-1460   Reconstruction               7-999-001  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0316   Reconstruction               7-999-002  01/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1473EP Energy Project               7-999-E01  05/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE

SPACKENKILL UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-16-02-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXMartha W. Lawrence Elementary-sold:
93-0937   Reconstruction               0-001-001  04/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0322   Reconstruction               0-001-003  01/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-03         -16,422                  07/02/12     /  /      Meyer Contracting Corporation       
 
06-1002   Reconstruction               0-001-004  03/02/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1643   Reconstruction               0-001-005  07/06/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001           -18,722                  03/17/08   04/29/08    PITTSFIELD PIPERS, INC.             
 
13-0992   Reconstruction               0-001-006  04/24/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             6,564                  09/12/14   09/16/14    PVS Construction LLC                
 

          Orville Todd Jr High School:
93-1175   Reconstruction               0-002-005  05/09/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1501   Reconstruction               0-002-006  06/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1471   Reconstruction               0-002-007  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1481   Reconstruction               0-002-008  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0277   Additions and Alterations    0-002-009  12/30/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002           7,620                  06/19/02   06/20/02    Hudson Valley Elec.                 
                                                            E-004           1,327                  06/19/02   06/20/02    Hudson Valley Elec.                 
                                                            E-005             285                  06/19/02   06/20/02    Hudson Valley Elec.                 
                                                            G-006          31,637                  06/19/02   06/20/02    Meyer Contracting                   
                                                            G-007          14,262                  06/19/02   06/20/02    Meyer Contracting                   
                                                            G-008          38,525                  06/19/02   06/20/02    Meyer Contracting                   
                                                            K-01              625                  06/19/02   06/20/02    Dutchess Restaurant Equip.          
                                                            ST-004        105,500                  06/19/02   06/20/02    HB Wiltse Excavating                
 
02-0012   Reconstruction               0-002-010  07/26/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           1,425                  01/08/03   01/16/03    Profex, Inc.                        
 
04-0323   Reconstruction               0-002-011  01/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            EC-01           9,511                  07/02/12     /  /      Canale Electric Corp.               
                                                            GC-01           5,588                  07/02/12     /  /      Meyer Contracting Corporation       
                                                            GC-03         -16,422                  07/02/12     /  /      Meyer Contracting Corporation       
                                                            GC-06          12,860                  07/02/12     /  /      Meyer Contracting Corporation       
                                                            GC-07               0                  07/02/12     /  /      Meyer Contracting Corporation       
                                                            GC-08          24,478                  12/21/06   01/30/07    Meyer Contracting                   
                                                            MC-01          42,000                  07/02/12     /  /      General Mechancial Systems, Inc.    
 
09-0913   Reconstruction               0-002-012  03/17/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,000                  12/01/10   12/28/10    NICKERSON CORPORATION               
 
11-1313   Reconstruction               0-002-013  06/06/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1316   Reconstruction               0-002-014  03/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0123   Reconstruction               0-002-016  12/13/18  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0776   Reconstruction               0-002-017  03/30/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0858   Reconstruction               0-002-018  04/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1727FP Reconstruction               0-002-FP1  05/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Nassau Road Elementary:
93-1176   Reconstruction               0-003-006  05/09/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1472   Reconstruction               0-003-007  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0640   Reconstruction               0-003-008  02/15/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-03           21,519                  10/24/01   05/28/02    Meyer Contracting                   
 
04-0324   Reconstruction               0-003-009  01/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02          20,617                  07/02/12     /  /      Meyer Contracting Corporation       
                                                            GC-04          67,117                  07/02/12     /  /      Meyer Contracting Corporation       
                                                            GC-05          10,924                  07/02/12     /  /      Meyer Contracting Corporation       
 
12-1317   Reconstruction               0-003-010  03/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1243   Reconstruction               0-003-011  02/26/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-01          20,375                  07/18/19   10/22/19    MILCON CONSTRUCTION CORP.           
 
18-0124   Reconstruction               0-003-012  12/13/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0161   Reconstruction               0-003-013  10/02/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0859   Reconstruction               0-003-014  04/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hagan Elementary School:
92-1313   Reconstruction               0-004-005  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1177   Reconstruction               0-004-006  05/09/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1473   Reconstruction               0-004-007  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0641   Reconstruction               0-004-009  02/15/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-02            5,300                  10/10/01   02/26/02    Meyer Contracting                   
 
04-0325   Reconstruction               0-004-010  01/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-06          12,860                  07/02/12     /  /      Meyer Contracting Corporation       
 
08-1657   Reconstruction               0-004-011  06/25/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0416   Reconstruction               0-004-012  02/27/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01             -4,000                  10/27/14   11/03/14    Tank Specialist Plus, LLC           
                                                            02              5,900                  10/27/14   11/03/14    Tank Specialist Plus, LLC           
 
12-1318   Reconstruction               0-004-013  03/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-0497   Reconstruction               0-004-014  01/13/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1244   Reconstruction               0-004-015  02/26/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0125   Reconstruction               0-004-016  12/13/18  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0860   Reconstruction               0-004-017  04/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1728FP Reconstruction               0-004-FP1  05/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Spackenkill High School:
93-1178   Additions and Alterations    0-005-007  05/09/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1327   Reconstruction               0-005-008  05/16/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1474   Reconstruction               0-005-009  06/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1542   Reconstruction               0-005-010  06/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1186   Reconstruction               0-005-011  04/17/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0642   Reconstruction               0-005-012  02/15/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01            9,900                  10/10/01   02/26/02    P&D Electric                        
                                                            E-02            2,399                  10/24/01   05/28/02    P&D Electric                        
                                                            G-01            6,053                  10/10/01   03/08/02    Meyer Contracting                   
 
01-1259   Reconstruction               0-005-014  05/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               2,448                  02/11/03   02/13/03    Dutchess Tel-Audio                  
 
05-0647   Reconstruction               0-005-015  10/19/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         14,814                  11/26/07   01/28/08    P&D Electric of hudson              
                                                            GC-001          4,245                  04/09/07   05/15/07    Meyer Contracting Corp              
                                                            GC-002         -4,520                  05/14/07   06/22/07    Meyer Contracting Corp              
                                                            GC-003            555                  07/17/07   08/20/07    Meyer Contracting                   
                                                            GC-004          1,815                  08/07/07   08/20/07    Meyer Contracting Corporation       
                                                            GC-005          4,818                  09/20/07   11/08/07    MEYER CONTRACTING CORPORATION       
                                                            GC-006        -13,414                  09/20/07   11/08/07    MEYER CONTRACTING CORPORATION       
                                                            GC-007         65,589                  10/03/07   11/08/07    Meyer Contracting Corp.             
                                                            MC-001        -15,000                  03/03/08   08/12/08    ASHLEY MECHANICAL, INC.             
                                                            PC-001           -746                  10/03/07   11/07/07    JAC Mechanical Services,Inc         
                                                            PC-002          5,711                  10/03/07   11/07/07    11/07/07anical Services,Inc.        
                                                            PC-003         -5,000                  03/03/08   08/12/08    JAC MECHANICAL SERIVICES, INC.      
                                                            RC-001        -13,750                  06/23/09   08/19/09    EVERFOAM INSULATION SERVICE         
                                                            SC-001         -2,975                  08/28/07   10/22/07    SUN UP ENTERPRISES, INC.            
 
09-0376   Additions and Alterations    0-005-016  02/19/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-001         -2,604                  09/27/10   10/15/10    MASTERCRAFT MASONRY I INC           
                                                            01-002          1,203                  11/12/10   11/16/10    MASTERCRAFT MASONRY I INC           
                                                            01-003           -332                  07/25/12   01/25/13    MASTERCRAFT MASONRY I INC           
                                                            01-004         51,919                  11/17/10   12/01/10    MASTERCRAFT MASONRY I INC           
                                                            01-005          7,595                  07/25/12   01/25/13    MASTERCRAFT MASONRY I INC           
                                                            01-006        172,200                  05/26/11   07/15/11    MASTERCRAFT MASONRY I INC           
                                                            01-007         15,313                  07/25/12   01/25/13    MASTERCRAFT MASONRY I INC           
                                                            01-008         58,831                  06/27/11   09/29/11    MASTERCRAFT MASONRY I INC           
                                                            01-009         13,644                  05/25/12   10/23/12    MASTERCRAFT MASONRY I INC           
                                                            01-010         71,877                  06/27/11   09/29/11    MASTERCRAFT MASONRY I INC           
                                                            01-011         42,273                  06/27/11   09/29/11    MASTERCRAFT MASONRY I INC           
                                                            01-012         61,274                  06/27/11   09/29/11    MASTERCRAFT MASONRY I INC           
                                                            01-015        -16,639                  06/18/13   07/16/13    Mastercraft Masonry, Inc.           
                                                            02-002          4,966                  03/18/11   04/08/11    DUTCHESS MECHANICAL INC             
                                                            03-001         47,840                  11/12/10   08/29/12    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            03-002         -3,840                  02/01/11   02/23/11    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            03-003         54,571                  05/25/12   11/24/14    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            03-004         25,918                  05/25/12   10/24/12    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            03-005         52,585                  06/27/11   02/15/12    PEARL RIVER P/H/E INC dba BERTUSSI'S
                                                            04-001          3,999                  08/10/10   09/07/10    RONDOUT ELECTRIC INC                
                                                            04-002          4,553                  08/10/10   09/07/10    RONDOUT ELECTRIC INC                
                                                            04-003         21,403                  08/10/10   09/07/10    RONDOUT ELECTRIC INC                
                                                            04-005          4,589                  07/25/12   07/29/13    RONDOUT ELECTRIC INC                
                                                            04-006         44,758                  11/17/10   11/17/10    RONDOUT ELECTRIC INC                
                                                            04-007         98,607                  06/24/11   02/15/12    RONDOUT ELECTRIC INC                
                                                            04-008         34,415                  05/25/12   06/28/13    RONDOUT ELECTRIC INC                
                                                            04-011         10,916                  07/25/12   07/29/13    RONDOUT ELECTRIC INC                
                                                            05-001          8,606                  11/12/10   11/16/10    EXCEL INSULATION CO INC             
                                                            05-003          5,430                  07/25/12   01/25/13    EXCEL INSULATION CO INC             
                                                            06-001         -3,727                  05/26/11   07/15/11    KITTREDGE EQUIPMENT COMPANY INC     
                                                            07-001            915                  07/25/12   07/29/13    BARBER MARKETING INC dba BMI SUPPLY 
                                                            08-001         -4,377                  09/23/11   11/01/11    GLASSOLUTIONS UNLIMITED CORP        
 
12-1319   Reconstruction               0-005-017  03/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0126   Reconstruction               0-005-019  12/13/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0931   Reconstruction               0-005-020  03/15/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0775   Reconstruction               0-005-021  03/30/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0861   Reconstruction               0-005-022  04/13/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1726FP Reconstruction               0-005-FP1  05/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXPortable-Todd Middle School Demoli:
97-1666   New Construction             0-008-001  07/07/98  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1320   Reconstruction               0-008-002  03/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0233   Reconstruction               0-008-003  09/07/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dugout/Storage:
11-0999   New Construction             2-010-001  04/10/12  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage Garage:
96-0121   Additions and Alterations    4-007-002  08/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1321   Reconstruction               4-007-003  03/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box @ High School:
18-0932   New Construction             7-011-001  03/15/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Restroom / Storage Building:
19-1535   New Construction             7-012-001  06/15/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
02-1552   Reconstruction               7-999-001  01/28/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1              -1,927                  05/18/05   12/04/06    NY power Authority                  
 
19-0875   Reconstruction               7-999-002  01/06/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXMartha Lawrence School:
00-0643   Reconstruction               8-009-003  02/15/01  NO CHANGE ORDERS ON ELECTRONIC FILE

RED HOOK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-17-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Annex Shop:
97-1326   Reconstruction               0-002-002  04/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1374   Additions and Alterations    0-002-003  05/09/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Linden Ave Middle School:
99-1375   Additions and Alterations    0-003-004  05/09/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001          75,652                  12/07/01   02/21/02    DSA Services                        
                                                            1-003          14,878                  12/21/01   03/08/02    DSA Services                        
                                                            1-004            -503                  05/14/04   05/17/04    DSA Services                        
                                                            10-003          2,574                  03/12/02   04/19/02    Crisafulli Bros.                    
                                                            10-004          3,353                  09/23/02   10/21/02    Crisafulli Bros.                    
                                                            10-005          1,285                  05/20/02   06/04/02    Crisafulli Bros.                    
                                                            10-009            763                  01/03/03   01/08/03    Crisafulli Bros.                    
                                                            11-001         -4,200                  05/14/04     /  /      Crisafulli Bros.                    
                                                            11-003           -954                  12/04/01   02/21/02    Crisafulli Bros.                    
                                                            11-005           -319                  09/23/02   10/21/02    Crisafulli Bros.                    
                                                            12-001        -16,619                  07/02/01   02/06/02    Hudson Valley Elec.                 
                                                            12-004         -9,275                  12/04/01   01/13/03    Hudson Valley Elec.                 
                                                            12-007         -3,800                  01/11/02   03/06/02    Hudson Valley Elec.                 
                                                            12-010          1,930                  02/26/02   04/17/02    Hudson Valley Elec.                 
                                                            12-013          2,618                  02/26/02   04/17/02    Hudson Valley Elec.                 
                                                            12-017          2,112                  09/23/02   10/21/02    Hudson Valley Elec.                 
                                                            12-018          3,489                  05/20/02   06/04/02    Hudson Valley Elec.                 
                                                            12-021          2,289                  05/31/02   06/04/02    Hudson Valley Elec.                 
                                                            12-022           -158                  07/23/02   08/28/02    Hudson Valley Elec.                 
                                                            12-025            440                  09/23/02   01/07/03    Hudson Valley Elec.                 
                                                            12-026          2,857                  09/17/02   10/21/02    Hudson Valley Elec.                 
                                                            12-028         -1,780                  09/17/02   10/21/02    Hudson Valley Elec.                 
                                                            12-029            599                  01/03/02   01/08/03    Hudson Valley Elec.                 
                                                            12-030          2,122                  01/03/03   01/08/03    Hudson Valley Elec.                 
                                                            12-032           -917                  01/03/03   01/08/03    Hudson Valley Elec.                 
                                                            12-033          6,063                  01/16/03   02/06/03    Hudson Valley Elec.                 
                                                            12-036           -200                  02/18/03   02/25/03    Hudson Valley Elec.                 
                                                            12-037          7,659                  12/16/03     /  /      Hudson Valley Elec.                 
                                                            13-001         19,761                  12/04/01   01/13/03    Johnson Controls                    
                                                            13-002         -4,513                  05/14/03   05/23/03    Johnson Controls                    
                                                            13-003          1,996                  01/08/04   01/20/04    Johnson Controls                    
                                                            16-002         -1,606                  09/17/02   10/21/02    Northeast Interior Systems          
                                                            16-003        -20,000                  02/18/03   02/25/03    Northeast Interior Systems          
                                                            16-004            894                  01/12/04   01/13/04    Northeast Interior Systems          
                                                            17-001         -5,000                  02/18/03   02/25/03    Telcar Group                        
                                                            19-001          7,520                  01/29/02   03/25/02    Nickerson                           
                                                            19-003         -5,000                  01/16/03   02/06/03    Nickerson                           
                                                            20-001          6,875                  02/26/02   04/17/02    Telcar Group                        
                                                            20-002         -5,000                  01/16/03   02/06/03    Telcar Group                        
                                                            23-001        -18,900                  01/08/04   01/13/04    NEP Glass Company                   
                                                            3-003          14,624                  12/04/01   02/21/02    A. Colarusso & Son                  
                                                            3-005           1,725                  01/11/02   03/06/02    A. Colarusso & Son                  
                                                            3-007           1,282                  09/23/02   10/21/02    A. Colarusso & Son                  
                                                            3-009             308                  07/23/02   08/28/02    A. Colarusso & Son                  
                                                            3-010             721                  09/17/02   10/21/02    A. Colarusso & Son                  
                                                            3-011           2,546                  01/03/03   01/21/04    A. Colarusso & Son                  
                                                            3-013           2,044                  10/22/02   01/08/03    A. Colarusso & Son                  
                                                            3-014            -504                  01/16/03   02/06/03    A. Colarusso & Son                  
                                                            3-015           8,598                  01/16/03   02/06/03    A. Colarusso & Son                  
                                                            3-016          -4,307                  02/18/03   01/13/04    A. Colarusso & Son                  
                                                            3-018           2,884                  05/14/03   05/23/03    A. Colarusso & Son                  
                                                            4-008            -966                  12/04/01   02/21/02    Fastracs Rentals                    
                                                            6-003          -1,080                  09/23/02   10/21/02    STS Steel                           
                                                            6-004           6,432                  09/23/02   10/21/02    STS Steel                           
                                                            6-005            -590                  09/23/02   10/21/02    STS Steel                           
                                                            6-006          14,300                  06/27/02   07/15/02    STS Steel                           
                                                            6-007           7,740                  07/23/02   08/28/02    STS Steel                           
                                                            6-009           1,880                  09/23/02   10/21/02    STS Steel                           
                                                            6-010             839                  01/03/02   01/08/03    STS Steel                           
                                                            6-013           2,321                  01/03/03   01/08/03    STS Steel                           
                                                            6-016             968                  01/16/03   02/06/03    STS Steel                           
                                                            7-004          21,145          21,145  12/16/03   01/21/04    Superior Roofing Of Ulster County   
                                                            8-005            -430                  12/04/01   02/21/02    UW Marx                             
                                                            8-008            -558                  12/20/01   03/06/02    UW Marx                             
                                                            8-009             366                  01/29/02   03/25/02    UW Marx                             
                                                            8-012          -6,702                  09/23/02   10/21/02    UW Marx                             
                                                            8-015         -26,388                  07/23/02   01/07/03    UW Marx                             
                                                            8-018            -516                  09/17/02   10/21/02    UW Marx                             
                                                            8-021          11,566                  09/17/02   10/21/02    UW Marx                             
                                                            8-022          -2,189                  09/17/02   10/21/02    UW Marx                             
                                                            8-022          -2,189                  09/17/02   10/21/02    UW Marx                             
                                                            8-023           3,463                  01/03/03   01/10/03    UW Marx                             
                                                            8-025             538                  01/03/03   01/10/03    UW Marx                             
                                                            8-028             200                  03/17/03   03/19/03    UW Marx                             
 
07-1053   Reconstruction               0-003-005  04/24/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1.001           2,871                  03/18/09   07/06/09    CB STRAIN & SON, INC.               
                                                            1.001           2,871                  03/18/09   04/08/09    CB STRAIN & SON, INC.               
                                                            CW-02          12,114                  11/15/12   03/07/13    Norhteast Interior Systems          
                                                            EC-04           2,825                  08/27/15   09/01/15    Sausto Contracting                  
                                                            GC-1.002       19,962                  09/18/08   10/21/08    Euggene Dilorenzo ,Inc              
                                                            HVAC1002          595                  01/22/09   04/10/09    CB STRAIN & SON, INC.               
                                                            HVAC1003          667                  04/20/09   06/02/09    CB STAIN & SON INC                  
                                                            M-E-1001        4,957                  09/18/08   07/08/09    Pantel Contracting Corp.            
                                                            M-HVAC-1        1,382                  08/25/08   06/18/09    CB Strain & Son, Inc.               
                                                            MGC-1.01       14,000                  08/11/08   10/21/08    EUGENE DILORENZO, INC.              
                                                            MGC1.003       26,597          23,032  01/22/09   07/09/09    EUGENE DILORENZO, INC.              
                                                            MRR1.001            0                  01/22/09   03/05/09    KOKO CONTRACTING,INC.               
                                                            MRR1.002       22,359                  04/08/10   06/16/10    KOKO CONTRACTING INC                
 
20-1566   Reconstruction               0-003-006  05/04/21  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0290   Reconstruction               0-003-007  02/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1513   Reconstruction               0-003-008  04/13/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0506   Reconstruction               0-003-009  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1382SC Visual Structural Inspection 0-003-SC1  01/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Red Hook High School:
95-0757   Reconstruction               0-005-003  03/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1328   Reconstruction               0-005-004  04/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1299   Additions and Alterations    0-005-005  05/04/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-002         -32,500                  12/21/01   03/08/02    DSA Services                        
                                                            10-001           -291                  12/05/01   02/20/02    Crisafulli Bros.                    
                                                            10-002           -140                  02/26/02   04/17/02    Crisafulli Bros.                    
                                                            10-006         13,055                  07/23/02   08/28/02    Crisafulli Bros                     
                                                            10-010            691                  10/22/02   01/08/03    Crisafulli Bros                     
                                                            11-002         -3,150                  05/14/04     /  /      Crisafulli Bros.                    
                                                            12-002        -16,619                  07/02/01   02/06/02    Hudson Valley Elec.                 
                                                            12-003        -31,858                  12/04/01   01/13/03    Hudson Valley Elec.                 
                                                            12-005         -5,867                  12/04/01   01/13/03    Hudson Valley Elec.                 
                                                            12-006            291                  12/05/01   02/20/02    Hudson Valley Elec.                 
                                                            12-008         -3,800                  01/11/02   03/06/02    Hudson Valley Elec.                 
                                                            12-009            526                  02/26/02   04/17/02    Hudson Valley Elec.                 
                                                            12-011           -140                  02/26/02   04/17/02    Hudson Valley Elec.                 
                                                            12-015          4,615                  03/20/02   04/19/02    Hudson Valley Elec.                 
                                                            12-019          1,850                  05/20/02   06/04/02    Hudson Valley Elec.                 
                                                            12-020            923                  05/31/02   06/04/02    Hudson Valley Elec.                 
                                                            12-023            219                  07/23/02   08/28/02    Hudson Valley Elec.                 
                                                            12-024            736                  09/23/02   10/21/02    Hudson Valley Elec.                 
                                                            12-027            990                  09/17/02   10/21/02    Hudson Valley Elec.                 
                                                            12-031          1,479                  10/21/02   01/08/03    Hudson Valley Elec.                 
                                                            12-034            725                  01/16/03   02/06/03    Hudson Valley Elec.                 
                                                            12-035            -51                  01/16/03   02/06/03    Hudson Valley Elec.                 
                                                            12-038          5,777                  12/16/03     /  /      Hudson Valley Elec.                 
                                                            13-004          1,298                  12/16/03   01/07/04    Johnson Controls                    
                                                            16-001         -1,916                  03/20/02   04/19/02    Northeast Interior Systems          
                                                            19-002       -133,139                  02/26/02   04/17/02    Nickerson                           
                                                            22-001           -840                  05/20/02   06/04/02    Nickerson                           
                                                            22-002         -4,032                  05/14/03   05/23/03    Nickerson                           
                                                            3-002          13,800                  12/04/01   02/21/02    A. Colarusso & Son                  
                                                            3-004           6,897                  01/11/02   03/06/02    A. Colarusso & Son                  
                                                            3-006             626                  01/29/02   03/25/02    A. Colarusso & Son                  
                                                            3-008           1,605                  09/23/02   10/21/02    A. Colarusso & Son                  
                                                            3-012           1,300                  10/22/02   01/08/03    A. Colarusso & Son                  
                                                            3-017          -3,536                  02/18/03   02/25/03    A. Colarusso & Son                  
                                                            4-003          42,230                  07/17/01   01/28/02    Fastracs Rentals                    
                                                            4-006             199                  12/04/01   02/21/02    Fastracs Rentals                    
                                                            6-002            -252                  09/23/02   10/21/02    STS Steel                           
                                                            6-008           1,743                  09/23/02   10/21/02    STS Steel                           
                                                            6-011           6,534                  09/17/02   01/08/03    STS Steel                           
                                                            6-012           1,822                  10/24/02   01/08/03    STS Steel                           
                                                            6-014            -223                  05/14/04   05/17/04    STS Steel                           
                                                            6-015             790                  01/16/03   02/06/03    STS Steel                           
                                                            6-017            -700                  02/18/03   02/25/03    STS Steel                           
                                                            7-002             252                  12/04/01   02/21/02    Superior Roofing                    
                                                            7-003          -5,130                  12/16/03   12/30/03    Superior Roofing                    
                                                            8-006            -430                  12/04/01   02/21/02    UW Marx                             
                                                            8-010            -206                  03/12/02   04/19/02    UW Marx                             
                                                            8-011             -85                  03/26/02   04/26/02    UW Marx                             
                                                            8-014          17,206                  05/31/02   06/04/02    UW Marx                             
                                                            8-017          -5,412                  09/17/02   10/21/02    UW Marx                             
                                                            8-019           4,158                  09/17/02   01/21/04    UW Marx                             
                                                            8-020          -2,186                  09/17/02   10/21/02    UW Marx                             
                                                            8-024           6,076                  09/06/02   01/08/03    UW Marx                             
                                                            8-026           1,012                  10/21/02   01/08/03    UW Marx                             
 
05-0343   Reconstruction               0-005-006  03/03/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001              0                  05/23/07   06/07/07    Sausto Construction                 
                                                            EC-002         -2,474                  05/23/07   06/07/07    Sausto Construction                 
                                                            GC-001              0                  08/03/06   10/13/06    Hudson Valley Electrical            
                                                            GC-002         -1,878                  09/15/06   10/19/06    Hudson Valley                       
 
07-1054   Reconstruction               0-005-007  04/24/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CW-01          10,148                  11/15/12   03/07/13    Northeast Interior Systems          
                                                            CW-03           2,626                  11/16/12   03/07/13    Northeast Interior Systems          
                                                            CW-04           3,989                  11/15/12   03/07/13    Norhteast Interior Systems          
                                                            CW-05            -449                  04/16/14   05/16/14    NORTHEAST INTERIOR SYSTEMS          
                                                            EC-01           3,637                  10/22/12   08/09/13    Sausto contracting                  
                                                            EC-02           1,728                  10/22/12   07/16/13    Sausto Contracting                  
                                                            EC-03          -6,981                  08/27/15   09/01/15    Sausto Contracting                  
                                                            EE2.1&HE          446                  04/20/17     /  /      Hudson Valley Electrical            
                                                            GC-01         -92,500                  12/19/12   04/26/13    CALADRI DEVELOPMENT                 
                                                            GC-01          15,595                  09/11/13   09/13/13    Key Interiors, LLC                  
                                                            GC-02               0                  01/07/13   04/05/13    CALADRI DEVELOPMENT                 
                                                            GC-02          35,459                  06/16/14   07/10/14    Key Interiors, LLC                  
                                                            GC-03         -12,858                  08/28/13   09/13/13    Caladri Development Corp            
                                                            GC-03          18,648                  08/01/14   10/28/14    Key Interiors, LLC                  
                                                            GC-05         -10,000                  02/25/15   03/18/15    Key Interiors, LLC                  
                                                            H-GC-1.1       44,000                  08/11/08   10/21/08    EUGENE DILORENZO, INC.              
                                                            H-GC1005       19,008                  04/20/09   08/04/09    EUGENE DILORENZO INC                
                                                            H-HVAC-1        5,402                  04/11/10   08/06/10    CB STRAIN & SON, INC.               
                                                            H-P-1001            0                  04/20/09   06/02/09    CB STAIN & SON INC                  
                                                            H-P-1002        8,281                  04/20/09   06/02/09    CB STAIN & SON INC                  
                                                            H-RR-1              0                  08/25/08   10/21/08    KOKO Contracting, Inc.              
                                                            HC-01          24,373                  09/17/12   08/09/13    C.B. STRAIN & SON INC               
                                                            HC-02          -5,011                  10/23/13   12/04/13    C. B. Strain & Son, Inc.            
                                                            HC-03         -24,000                  11/04/13   12/04/13    C.B. STRAIN & SON INC               
                                                            HE-1.001         -352                  04/20/17   04/25/17    Hudson Valley Electrical            
                                                            HGC1.002      106,559                  01/12/09   05/22/09    EUGENE DILORENZO, INC.              
                                                            HGC1.003       22,293                  01/22/09   03/05/09    EUGENE DILORENZO, INC.              
                                                            HGC1.004         -944                  01/22/09   03/05/09    EUGENE DILORENZO, INC.              
                                                            HGC1.006        7,995                  03/18/10   05/28/10    EUGENE DILORENZO, INC.              
                                                            HM-01           5,968                  10/25/12   02/22/13    GREENLAND ENTERPRISES LLC           
                                                            HM-05           1,441                  10/23/13   12/04/13    Greenland Enterprises, LLC          
                                                            HRR1.002       29,356                  04/29/10   07/21/10    KOKO CONTRACTING INC                
                                                            HVAC-1.0       67,661                  08/25/08   07/10/19    CB STRAIN & SON, INC.               
                                                            HVAC1002        1,627                  01/22/09   04/10/09    CB STRAIN & SON, INC.               
                                                            HVAC1003        1,980                  01/22/09   04/10/09    CB STRAIN & SON, INC.               
                                                            HVAC1004        1,342                  04/20/09   06/02/09    CB STAIN & SON INC                  
                                                            HVAC1005       15,888                  04/20/09   06/02/09    CB STAIN & SON INC                  
                                                            PC-01          -6,525                  10/23/13   12/04/13    C.B. Strain & Son, Inc.             
 
18-0177   Additions and Alterations    0-005-009  12/18/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          67,270                  09/09/20   11/06/20    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-02          -6,500                  06/21/21   02/01/22    Kasselman Electric Co               
                                                            EC-03         -11,035                  07/26/21   04/05/22    KASSELMAN ELECTRTIC CO INC          
                                                            GC-01        -216,840                  06/20/19   07/05/19    MEYER CONTRACTING CORP.             
                                                            GC-02           2,237                  09/09/20   11/24/20    MEYER CONTRACTING CORP.             
                                                            GC-03          -1,957                  12/11/20   03/09/21    MEYER CONTRACTING CORP.             
                                                            GC-04           1,200                  12/11/20   03/09/21    MEYER CONTRACTING CORP.             
                                                            GC-05         -27,500                  04/23/21   05/18/21    MEYER CONTRACTING CORP.             
                                                            GC-06          -6,000                  06/16/21   03/15/22    Meyer Contracting Corporation       
                                                            GC-07         -17,408                  07/26/21   04/05/22    MEYER CONTRACTING CORP              
                                                            GC-08          -4,000                  08/19/21   05/17/22    MEYER CONTRACTING CORPORATION       
                                                            GC-09            -500                  08/19/21   05/17/22    MEYER CONTRACTING CORPORATION       
                                                            MC-01          -4,178                  07/26/21   04/05/22    TRANE                               
                                                            PC-01         -11,400                  09/09/20   11/06/20    JOHN W. DANFORTH CO.                
                                                            PC-02           1,957                  01/21/21   04/09/21    JOHN W. DANFORTH CO.                
                                                            PC-03         -10,000                  03/29/21   05/13/21    JOHN W. DANFORTH CO.                
                                                            PC-04            -345                  06/28/21   11/16/21    John W. Danforth                    
                                                            TR-01          -1,200                  01/08/21   03/29/21    JANSON INDUSTRIES                   
                                                            TR-02          -5,000                  03/19/21   05/20/21    JANSON INDUSTRIES                   
                                                            TR-03            -690                  06/21/21   02/01/22    Janson Industries                   
 
18-0095   Reconstruction               0-005-010  07/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AB-01          13,000                  01/22/19   02/11/19    A-TECH GROUP, LLC                   
 
19-0123   Reconstruction               0-005-011  08/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0291   Reconstruction               0-005-012  02/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0598FC Reconstruction               0-005-013  11/10/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -17,876                  04/24/23   01/08/24    BARONE CONSTRUCTION GROUP           
                                                            GC-02          -7,843                  04/24/23   01/08/24    BARONE CONSTRUCTION GROUP           
                                                            GC-03         -19,405                  04/28/23   01/09/24    BARONE CONSTRUCTION GROUP           
 
22-0507   Reconstruction               0-005-014  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1817   Reconstruction               0-005-015  04/18/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1254FP Reconstruction               0-005-FP1  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0746SC Visual Structural Inspection 0-005-SC1  06/07/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mill Rd. Elementary:
92-1216   Reconstruction               0-006-002  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1325   Reconstruction               0-006-003  04/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1021   Additions and Alterations    0-006-004  05/04/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10-008         12,192                  01/03/03   01/08/03    Crisafulli Bros.                    
                                                            12-012            400                  02/26/02   04/17/02    Hudson Valley Elec.                 
                                                            12-016          1,435                  03/20/02   04/19/02    Hudson Valley Elec.                 
                                                            18-002         -5,000                  02/26/02   04/17/02    Facilities Equip. & Service         
                                                            2-001          -2,570                  07/02/01   02/06/02    Delsignore Paving                   
                                                            2-002            -797                  02/18/03   02/24/03    Delsignore Paving                   
                                                            2-003          -4,000                  02/18/03   02/25/03    Delsignore Paving                   
                                                            4-005           1,601                  08/03/01   01/30/02    Fastracs Rentals                    
                                                            4-007             405                  12/04/01   02/21/02    Fastracs Rentals                    
                                                            6-001          -2,218                  12/04/01   02/21/02    STS Steel                           
                                                            8-004            -430                  12/04/01   02/21/02    UW Marx                             
                                                            8-007          -1,500                  12/04/01   02/21/02    UW Marx                             
                                                            8-013            -400                  09/23/02   10/21/02    UW Marx                             
                                                            8-016          -2,000                  09/17/02   10/21/02    UW Marx                             
 
05-0049   Reconstruction               0-006-005  07/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAC-001         4,000                  10/07/05   10/17/05    Edgeco Environmental                
                                                            AAC-002        -2,000                  10/07/05   10/17/05    Edgeco Environmental                
                                                            AAC-003          -500                  11/01/05   11/04/05    Edgeco Environmental                
                                                            P-001               0                  02/13/06   03/02/06    CB Strain and Sons                  
                                                            P-002               0                  04/13/06   05/26/06    CB strain and Sons                  
                                                            P-003          -3,046                  04/13/06   05/26/06    Cb  Strain and Sons                 
 
06-0616   Reconstruction               0-006-006  12/28/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-001               0                  06/18/07   08/07/07    Noreaster heating                   
                                                            P-002          -8,469                  07/19/07   08/07/07    Noreaster heating                   
 
07-1055   Reconstruction               0-006-007  04/24/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E-GC-1&1      151,000                  08/11/08   10/21/08    EUGENE DILORENZO, INC.              
                                                            E-HVAC-1       38,106                  08/25/08   06/25/10    CB Strain & Son, Inc.               
                                                            E-P2.001        2,161                  03/22/10   06/14/10    CB STRAIN & SON INC                 
                                                            E-RR-2        -58,364                  10/18/10   11/23/10    MONPAT CONSTRUCTION INC             
                                                            EE2.HE1.          446                  04/17/17   04/25/17    Hudson Valley Construction          
                                                            EGC1&2.3       10,884           6,470  01/22/09   04/25/17    EUGENE DILORENZO, INC.              
                                                            EGC1&2.4       20,375                  01/22/09   03/05/09    EUGENE DILORENZO,INC.               
                                                            EGC1&2.5       53,071                  12/09/09   01/21/10    EUGENE DILORENZO INC                
                                                            EGC1&2.6       12,631                  01/11/10   04/21/10    EUGENE DILORENZO INC                
                                                            EHVAC1.2        3,732                  01/22/09   04/10/09    CB STAIN & SON, INC.                
                                                            EHVAC1.4        2,777                  03/11/10   05/28/10    CB STRAIN & SON INC                 
                                                            EHVAC2.1       -7,500                  03/11/10   05/28/10    CB STRAIN & SON INC                 
                                                            EP-3.001        4,067                  03/22/10   06/14/10    CB STRAIN & SON INC                 
                                                            ERR1.001      -29,273                  01/25/10   03/05/10    HUDSON VALLEY ROOFING & SHEET METAL 
                                                            GC-04          43,512                  08/01/14   10/28/14    Key Interiors, LLC                  
                                                            Gc-1&2        157,516          53,517  09/18/08   07/09/09    Eugene DiLorenzo                    
                                                            HM-02           4,955                  01/17/13   04/02/13    GREENLAND ENTERPRISES LLC           
                                                            HM-03           1,250                  02/04/13   04/26/13    GREENLAND ENTERPRISES LLC           
                                                            HM-04            -271                  05/13/13   11/22/13    Greenland Enterprises, LLC          
 
13-0609   Reconstruction               0-006-008  06/05/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            40,720                  07/28/15   10/29/15    Hoosick Valley Contractors Inc.     
                                                            1               9,841                  12/29/15   01/11/16    Framan Mechanical Inc.              
                                                            AC-01          14,811                  07/25/18   12/28/18    SUBURBAN RESTORATION CO INC         
                                                            CO-001        -40,399                  12/20/17   02/02/18    Day Automation Systems              
                                                            EC-001         -1,342                  12/19/16   01/06/17    Stilsing Electrical, Inc.           
                                                            GC-002          7,741                  06/06/16   07/07/16    THE PALOMBO GROUP                   
                                                            GC-01         -15,000                  10/21/14   10/21/14    Meyer Contracting Corporation       
                                                            GC-02            -500                  04/20/15   07/03/15    Meyer Contracting Corporation       
                                                            HC-01         -10,000                  10/21/14   10/24/14    S&O Construction Serivices, Inc.    
                                                            HC1-001       -19,780                  04/14/16   05/04/16    SOUTHEAST MECHANICAL CORPORATION    
                                                            HC2-002        14,196                  12/29/15   01/11/16    Framan Mechanical, Inc.             
 
17-0382   Reconstruction               0-006-009  12/27/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P1                  0                  11/13/18   01/15/19    ACTION MECHANICAL                   
                                                            P2                  0                  11/13/18   01/15/19    ACTION MECHANICAL                   
                                                            P3                  0                  11/13/18   01/15/19     MECHANICAL                         
                                                            P4             -1,503                  11/13/18   01/15/19    ACTION MECHANICAL                   
 
22-0292   Reconstruction               0-006-011  02/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0508   Reconstruction               0-006-012  01/20/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1255FP Reconstruction               0-006-FP1  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1380SC Visual Structural Inspection 0-006-SC1  01/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Portable at Linden:
98-1680   Additions and Alterations    0-011-001  10/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Portable @ High School:
98-1679   Additions and Alterations    0-012-001  10/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Districtwide  telecomm. wiring:
95-0758   Reconstruction               0-999-001  03/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mill Rd. Bus Garage:
97-1327   Reconstruction               4-008-001  04/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1020   Reconstruction               4-008-002  05/04/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Linden Ave Bus Garage:
97-1324   Reconstruction               5-007-002  04/17/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1376   Additions and Alterations    5-007-004  05/09/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            12-014           -942                  03/12/02   01/07/04    Hudson Valley Elec.                 
                                                            3-011           2,546                  01/03/03   01/08/03    A. Colarusso & Son                  
 
07-0273   Reconstruction               5-007-005  10/05/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         44,541                  06/02/08   08/08/08    Total Tool,LTD                      
 
09-1011   Reconstruction               5-007-006  03/15/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01           6,904                  08/16/10   09/10/10    CONKLIN SERVICES AND CONSTRUCTION   
                                                            PC-02           1,456                  10/20/10   11/19/10    CONKLIN SERVICES & CONSTRUCTION INC 
 
07-1381SC Visual Structural Inspection 5-007-SC1  01/17/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Pump House:
99-1635   New Construction             7-013-001  05/04/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ Football Field:
05-0226   Reconstruction               7-020-001  10/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Playground Stage @ Mill Rd ES:
16-1623   New Construction             7-025-001  05/06/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mill Road School Garden Gazebo:
21-0396   New Construction             7-027-001  12/01/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          DISTRICT WIDE:
13-0824   Reconstruction               7-999-001  03/19/14  NO CHANGE ORDERS ON ELECTRONIC FILE

RHINEBECK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-18-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
90-1817   Reconstruction               0-002-006  07/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0908   Additions and Alterations    0-002-007  05/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0039   Reconstruction               0-002-008  08/08/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0756   Reconstruction               0-002-010  02/02/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              19,762                  01/18/02   03/06/02    Citizens Communications             
                                                            2               2,076                  05/23/03   05/23/03    Citizens Communications             
                                                            3               1,800                  01/18/02   03/06/02    Citizens Communications             
 
97-1650   Reconstruction               0-002-011  07/03/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1270   Reconstruction               0-002-012  06/22/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1157   Reconstruction               0-002-013  05/24/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0886   Additions and Alterations    0-002-014  04/22/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001            12,590                  02/12/07   03/13/07    Gross Electric                      
                                                            001A            8,080                  04/05/06   04/10/06    LHV Precast Inc                     
                                                            002            72,222                  04/05/06   04/10/06    Meyer Contracting                   
                                                            002             8,382                  02/12/07   03/12/07    Gross Electric                      
                                                            003             5,162                  04/05/06   04/10/06    Meyer Contracting                   
                                                            003             7,392                  02/12/07   03/12/07    Gross Electric                      
                                                            004            14,639                  04/05/06   04/10/06    Meyer Contracting                   
                                                            004             5,694                  02/12/07   03/12/07    Gross Electric                      
                                                            005             5,324                  04/05/06   04/10/06    Meyer Contracting                   
                                                            005             8,007                  02/12/07   03/12/07    Gross Electric                      
                                                            006             3,494                  04/05/06   04/10/06    Meyer Contracting                   
                                                            007             2,814                  04/05/06   04/10/06    Meyer Contracting                   
                                                            008            11,412                  04/05/06   04/10/06    Meyer Contracting                   
                                                            009             3,286                  04/05/06   04/10/06    Meyer Contracting                   
                                                            01             18,595                  04/05/06   04/10/06    Meyer Contracting                   
                                                            010             1,329                  09/05/06   10/12/06    Meyer Contracting                   
                                                            011             6,023                  09/05/06   04/11/07    Meyer Contracting                   
                                                            012            10,733                  09/05/06   10/12/06    Meyer Contracting                   
                                                            013             1,262                  09/05/06   10/12/06    Meyer Contracting                   
                                                            014            -2,538                  09/05/06   10/12/06    Meyer Contracting                   
                                                            015             2,707                  09/05/06   10/12/06    Meyer Contracting                   
                                                            016            -1,535                  09/05/06   10/12/06    Meyer Contracting                   
                                                            017             1,192                  09/05/06   10/12/06    Meyer Contracting                   
                                                            018             1,655                  09/05/06   10/12/06    Meyer Contracting                   
                                                            019             1,242                  09/05/06   10/12/06    Meyer Contracting                   
                                                            020             1,993                  09/05/06   10/12/06    Meyer Contracting                   
                                                            021             2,067                  09/05/06   10/12/06    Meyer Contracting                   
                                                            023             2,162                  09/05/06   10/12/06    Meyer Contracting                   
                                                            024             5,661                  09/05/06   10/12/06    Meyer Contracting                   
                                                            025             5,848                  09/05/06   10/12/06    Meyer Contracting                   
                                                            026             3,178                  09/05/06   10/12/06    Meyer Contracting                   
                                                            027             7,002                  10/24/06   12/14/06    Meyer Contracting                   
                                                            028             9,654                  10/24/06   12/14/06    Meyer Contracting                   
                                                            029             1,227                  10/24/06   06/18/10    Meyer Contracting                   
                                                            030             1,323                  10/24/06   12/14/06    Meyer Contracting                   
                                                            031            23,914                  10/24/06   12/14/06    Meyer Contracting                   
                                                            032            14,868                  10/24/06   12/14/06    Meyer Contracting                   
                                                            033             1,082                  10/24/06   12/14/06    Meyer Contracting                   
                                                            034             2,118                  10/24/06   12/14/06    Meyer Contracting                   
                                                            035           -15,000                  10/24/06   12/14/06    Meyer Contracting                   
                                                            036              -480                  10/24/06   12/14/06    Meyer Contracting                   
                                                            037             6,386                  12/08/06   01/30/07    Meyer Contracting                   
                                                            038             3,603                  12/08/06   01/30/07    Meyer Contracting                   
                                                            039             1,979                  12/08/06   01/30/07    Meyer Contracting                   
                                                            040             3,140                  12/08/06   01/30/07    Meyer Contracting                   
                                                            041            10,176                  12/08/06   01/30/07    Meyer Contracting                   
                                                            042           112,167                  12/08/06   06/24/10    Meyer Contracting                   
                                                            044             1,314                  12/08/06   01/30/07    Meyer Contracting                   
                                                            045           154,269                  12/08/06   06/24/10    Meyer Contracting                   
                                                            047               944                  12/08/06   01/30/07    Meyer Contracting                   
                                                            048             1,974                  12/08/06   01/30/07    Meyer Contracting                   
                                                            050            10,764                  12/08/06   01/30/07    Meyer Contracting                   
                                                            051            -1,341                  12/08/06   06/18/10    Meyer Contracting                   
                                                            052            21,523                  02/12/07   03/14/07    Meyer Contracting                   
                                                            053             7,662                  12/08/06   01/30/07    Meyer Contracting                   
                                                            054            15,286                  02/12/07   03/14/07    Meyer Contracting                   
                                                            055            -1,999                  02/12/07   03/14/07    Meyer Contracting                   
                                                            057             3,858                  02/12/07   03/14/07    Meyer Contracting                   
                                                            058             1,170                  02/12/07   03/14/07    Meyer Contracting                   
                                                            059             1,433                  02/12/07   03/14/07    Meyer Contracting                   
                                                            060            10,127                  02/12/07   03/14/07    Meyer Contracting                   
                                                            062               583                  02/12/07   03/14/07    Meyer Contracting                   
                                                            063             1,402                  02/12/07   03/14/07    Meyer Contracting                   
                                                            064             2,998                  02/12/07   03/14/07    Meyer Contracting                   
                                                            066             1,022                  02/12/07   03/14/07    Meyer Contracting                   
                                                            067             4,869                  02/12/07   03/14/07    Meyer Contracting                   
                                                            068             4,895                  02/12/07   03/14/07    Meyer Contracting                   
                                                            069             7,490                  02/12/07   03/14/07    Meyer Contracting                   
                                                            070             2,137                  02/12/07   03/14/07    Meyer Contracting                   
                                                            071             1,100                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            072             2,345                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            073             2,854                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            079            19,264                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            081            41,008                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            74              2,501                  06/11/10   06/15/10    MEYER CONTRACTING CORPORATION       
                                                            75             50,215                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            76              1,231                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            77              1,025                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            78             19,078                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            80             -9,202                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            81             41,008                  06/11/10   06/15/10    MEYER CONTRACTING CORP.             
                                                            82             16,810                  06/11/10   06/15/10    MEYER CONSTRUCTION CORP.            
                                                            83              8,329                  06/11/10   06/18/10    MERYER CONSTRUCTION CORP.           
                                                            84             10,848                  06/11/10   06/15/10    MEYER CONSTRUCTION CORP.            
                                                            85              5,427                  06/11/10   06/15/10    MEYER CONSTRUCTION CORP.            
 
05-1123   Reconstruction               0-002-015  10/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1367   Reconstruction               0-002-016  01/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          1,500                  07/15/08   08/26/08    Richers Electric, Inc               
                                                            EC-002              0                  08/25/08   09/29/08    Richers Electric, Inc.              
                                                            EC-003         -5,430                  03/17/09   04/03/09    RICHERS ELECTRIC                    
                                                            GC-001         -5,029                  06/29/08   09/29/08    MEYER CONTRACTING CORPORATION       
                                                            GC-002         41,894                  07/15/08   09/29/08    Meyer Contracting Corp.             
                                                            GC-003          2,061                  07/15/08   09/29/08    Meyer Contracting Corporation       
                                                            GC-005              0                  08/12/08   09/29/08    MEYER CONTRACTING CORPORATION       
                                                            GC-007          2,014                  01/02/09   02/27/09    MEYER CONTRACTING CORPORATION       
 
17-0018   Reconstruction               0-002-017  05/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AB-01          72,784                  03/22/21   05/20/21    AKTOR CORP.                         
                                                            AB-02          -8,545                  05/03/21   04/07/22    AKTOR CORP.                         
                                                            EC-01          51,763                  08/08/19   08/20/19    HUDSON VALLEY ELECTRICAL CONSTRUCTIO
                                                            EC-02           4,388                  05/03/21   08/26/21    HUDSON VALLEY ELECTRICAL CONSTRUCTIO
                                                            EC-04          22,581                  05/03/21   08/26/21    HUDSON VALLEY ELECTRICAL CONSTRUCTIO
                                                            EC-05            -761                  06/23/21   10/12/21    Hudson Valley Electrical            
                                                            GC-01         -92,399                  06/16/21   04/04/22    Key Construction Services           
                                                            GC-04           8,631                  08/26/21   05/06/22    KEY CONSTRUCTION SERVICES, LLC      
                                                            GC-05           2,300                  10/13/21   12/02/22    Key Const Services, LLC             
                                                            GC-06          27,027                  10/13/21   12/02/22    Key Const Services, LLC             
                                                            GC-07         -40,830                  10/13/21   12/02/22    Key Const Services LLC              
                                                            MC-01          -1,675                  09/09/20   11/06/20    S&O CONSTRUCTION SERVICES, INC.     
                                                            PC-02           2,604                  09/16/19   09/18/19    DUTCHESS MECHANICAL, INC.           
                                                            PC-05           2,263                  01/27/21   03/24/21    DUTCHESS MECHANICAL, INC.           
                                                            PC-06           2,300                  06/16/21   03/22/22    Dutchess Mechanical Inc             
                                                            RC3A-02        -9,290                  10/11/22   12/06/23    Frank Cyrwus Inc                    
                                                            RC3B-01        -2,487                  01/27/21   04/21/21    PUFF, INC.                          
                                                            SC-01         105,522                  09/09/20   11/25/20    DELSIGNORE BLACKTOP PAVING, INC.    
                                                            SC-02         175,266                  09/09/20   11/25/20    DELSIGNORE BLACKTOP PAVING, INC.    
                                                            SC-05          33,974                  08/26/21   11/25/22    DELSIGNORE BLACKTOP PAVING, INC     
                                                            SC-06          -2,391                  11/03/21   12/13/22    DelSignore Blacktop Paving, Inc     
 
22-1502   Reconstruction               0-002-018  04/04/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0749FP Reconstruction               0-002-FP1  01/13/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Livingston Elem. School:
96-0162   Additions and Alterations    0-004-006  09/11/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1158   Reconstruction               0-004-009  05/24/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0755   Alterations                  0-004-010  02/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0887   Additions and Alterations    0-004-011  04/22/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005             8,450                  02/12/07   03/14/07    Jupiter Environmental               
                                                            046             8,207                  12/08/06   01/30/07    Meyer Contracting                   
                                                            049               928                  12/08/06   01/30/07    Meyer Contracting                   
                                                            052            21,523                  02/12/07   06/18/10    Meyer Contracting                   
                                                            056            11,447                  02/12/07   03/14/07    Meyer Contracting                   
                                                            061            13,914                  02/12/07   03/14/07    Meyer Contracting                   
                                                            065             2,847                  02/12/07   03/14/07    Meyer Contracting                   
 
05-1124   Reconstruction               0-004-012  10/12/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1368   Reconstruction               0-004-013  01/28/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002              0                  08/25/08     /  /      Richers Electric, Inc.              
                                                            GC-004            340                  07/28/08   09/29/08    MEYER CONTRACTING CORPORATION       
                                                            GC-006          1,921                  08/25/08   10/24/08    Meyer Contracting Corporation       
                                                            SC-002         -5,000                  10/27/08   03/10/09    CON-TECH CONSTRUCTION               
 
17-0019   Reconstruction               0-004-014  05/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03          12,487                  05/03/21   08/26/21    HUDSON VALLEY ELECTRICAL CONSTRUCTIO
                                                            GC-02           1,791                  06/16/21   04/04/22    Key Construction Services           
                                                            GC-03             368                  08/26/21   05/06/22    KEY CONSTRUCTION SERVICES, LLC      
                                                            PC-01           8,689                  09/16/19   09/18/19    DUTCHESS MECHANICAL, INC.           
                                                            RC3A-01       -22,920                  03/22/21   05/06/21    FRANK CYRWUS, INC.                  
                                                            SC-03         186,842                  09/09/20   11/25/20    DELSIGNORE BLACKTOP PAVING, INC.    
                                                            SC-04           4,235                  08/26/21   11/25/22    DELSIGNORE BLACKTOP PAVING,INC      
                                                            SC-07          -4,961                  11/03/21   12/13/22    DelSignore Blacktop Paving, Inc     
                                                            WC-01          33,927                  05/03/21   04/07/22    ZERODRAFT OF CNY, INC.              
 
02-0750FP Reconstruction               0-004-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Chancellor Livingston Modular:
01-1488   New Construction             0-008-001  07/11/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -76,450                  01/08/03   02/03/03    Arold Paving                        
                                                            2              14,000                  01/08/03   01/23/03    Arold Paving                        
                                                            3                 400                  01/08/03   02/03/03    Arold Paving                        
 

RHINECLIFF UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-18-02-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Field House:
91-0745   Reconstruction               0-003-002  02/26/92  NO CHANGE ORDERS ON ELECTRONIC FILE

WAPPINGERS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-21-01-06
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Fishkill Plains Elementary:
92-0380   Reconstruction               0-001-005  11/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1284   Reconstruction               0-001-006  06/06/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0548   Reconstruction               0-001-007  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0365   Reconstruction               0-001-012  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0842   Reconstruction               0-001-013  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-007               0                  10/14/14   10/23/14    Con Tech Construction Technology    
                                                            W.1.2003      -13,790                  02/11/16   03/14/16    Window Specialist                   
 
13-0855   Reconstruction               0-001-014  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1132   Reconstruction               0-001-015  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0477   Reconstruction               0-001-016  05/03/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0090   Reconstruction               0-001-017  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0872   Reconstruction               0-001-018  01/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R.3-001        -6,347                  12/13/19   12/26/19    GENERAL ROOFING CONTRACTORS         
                                                            R.3-002         3,500                  03/11/20   07/06/20    GENERAL ROOFING CONTRACTORS         
 
21-1223   Reconstruction               0-001-019  05/23/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1472   Reconstruction               0-001-020  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Kinry Road Elementary:
93-1701   Reconstruction               0-002-006  06/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0549   Reconstruction               0-002-008  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1160   Reconstruction               0-002-010  06/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,118                  07/02/04   07/13/04    H Osterhoudt Excavating             
                                                            2               3,400                  07/02/04   07/13/04    H Osterhoudt Excavating             
                                                            3              12,400                  07/02/04   07/13/04    H Osterhoudt Excavating             
 
11-0366   Reconstruction               0-002-014  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0856   Reconstruction               0-002-016  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1133   Reconstruction               0-002-017  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            E.1-012         3,929                  02/11/16   03/16/16    RLJ Electric Corporation            
                                                            GW.3-017        4,609                  01/20/17   01/25/17    Verticon LTD                        
                                                            GW.3-020        3,944                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-021        4,277                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-021        4,277                  02/11/16     /  /      Verticon LTD                        
                                                            GW.3-025        4,526                  09/19/16   11/02/16    Verticon LTD                        
                                                            GW.3-026        4,526                  09/19/16   11/02/16    Verticon LTD                        
                                                            GW.3-026        4,526                  01/20/17   01/25/17    Verticon LTD                        
                                                            GW.3-027        4,676                  09/19/16   11/02/16    Verticon LTD                        
                                                            GW.3-030        1,254                  09/19/16   11/02/16    Verticon LTD                        
                                                            H.2-004         3,366                  08/24/15   09/01/15    Ashley Mechanical Incorporated      
                                                            H.2-008         4,646                  12/15/15   01/08/16    Ashley Mechanical Incorporated      
                                                            H.2-009         4,646                  12/15/15   01/08/16    Ashely Mechanical Incorporated      
                                                            H.2-010         4,490                  12/15/15   01/08/16    Ashley Mechanical Incorporated      
 
16-0801   Reconstruction               0-002-019  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S4            -15,198                  02/20/19   03/04/19    TILCON NEW YORK,INC.                
                                                            S6             -5,943                  03/11/20   07/06/20    TILCON NEW YORK, INC.               
 
19-0091   Reconstruction               0-002-020  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0873   Reconstruction               0-002-021  01/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W.3-003        -5,008                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
 
22-1201   Reconstruction               0-002-022  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          James Evans Elementary:
93-1252   Reconstruction               0-003-008  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0550   Reconstruction               0-003-009  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1516   Reconstruction               0-003-011  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1557   Reconstruction               0-003-012  06/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1480   Reconstruction               0-003-016  08/09/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -500                  01/18/07   02/01/07    RLJ Electric                        
 
07-0130   Reconstruction               0-003-017  09/12/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01R          6,150                  10/21/08   05/14/09    AMERICAN GLASS CO. OF ALBANY INC.   
 
11-0367   Reconstruction               0-003-018  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1296   Reconstruction               0-003-019  06/18/13  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1274   Reconstruction               0-003-020  06/19/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,120                  02/03/14   03/05/14    American Glass Company of Albany    
 
13-0844   Reconstruction               0-003-021  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-007             527                  12/12/16   12/15/16    Window Specialist                   
 
13-0857   Reconstruction               0-003-022  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1134   Reconstruction               0-003-023  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1-005           4,662                  02/11/16   04/12/16    RLJ Electric Corporation            
                                                            1-007           2,608                  02/11/16   04/12/16    RLJ Electric Corporation            
                                                            1-008           2,503                  02/11/16   04/12/16    RLJ Electric Corporation            
                                                            1-009           4,948                  02/11/16   04/12/16    RLJ Electric Corporation            
                                                            1-010           4,368                  02/11/16   03/21/16    RLJ Electric Corporation            
                                                            3-015           7,757                  02/11/16   02/19/16    Verticon LTD                        
                                                            3-016          11,205                  02/11/16   03/21/16    Verticon LTD                        
                                                            3-018           6,589                  02/11/16   03/21/16    Verticon LTD                        
                                                            3-019           4,362                  02/11/16   03/21/16    Verticon LTD                        
                                                            3-023           3,023                  02/11/16   03/21/16    Veritcon LTD                        
                                                            3-24            5,145                  02/11/16   04/12/16    Verticon LTD                        
                                                            GW.3-029        1,039                  09/19/16   11/02/16    Verticon LTD                        
                                                            H.2-002             0                  04/15/15   04/28/15    Ashley Mechanical Incorporated      
                                                            H.2-003        -1,904                  08/24/15   09/01/15    Ashley MEchanical Incorporated      
                                                            H.2-007         4,410                  12/15/15   01/11/16    Ashley Mechanical Incorporated      
                                                            H.2-011         1,750                  12/15/15   01/08/16    Ashley Mechanical Incorporated      
                                                            H.2-012        10,481                  12/15/15   01/08/16    Ashley Mechanical Incorporated      
 
15-1170   Reconstruction               0-003-024  02/12/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,490                  03/23/17   03/24/17    More Consulting                     
 
17-0478   Reconstruction               0-003-025  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-008         8,848                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-021         2,017                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            GW.2-005            0                  10/09/18   11/15/18    MEYER CONTRACTING                   
                                                            GW.2-009            0                  08/07/19   08/15/19    MEYER CONTRACTING                   
                                                            GW.2-011       -2,913                  01/03/20   02/03/20    MEYER CONTRACTING                   
                                                            GW.2-017        9,876                  01/03/20   02/03/20    MEYER CONTRACTING                   
                                                            GW.2-020        2,800                  01/03/20   01/31/20    MEYER CONTRACTING                   
                                                            GW.2-021        2,960                  03/11/20   07/06/20    MEYER CONTRACTING                   
                                                            GW.2-023        3,492                  03/11/20   07/06/20    MEYER CONTRACTING                   
 
16-0802   Reconstruction               0-003-026  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW-04         -15,073                  02/12/18   03/08/18    Meyers Contracting Corporation      
                                                            S1              9,019                  02/20/19   03/04/19    TILCON-NY INC.                      
                                                            S3              1,755                  02/20/19   03/04/19    TILCON NEW YORK, INC.               
 
19-0092   Reconstruction               0-003-027  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1202   Reconstruction               0-003-028  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Junior High School:
90-1375   Reconstruction               0-004-009  05/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0381   Reconstruction               0-004-011  11/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1173   Reconstruction               0-004-012  04/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0551   Reconstruction               0-004-013  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0054   Reconstruction               0-004-015  08/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1558   Reconstruction               0-004-018  06/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0749   Reconstruction               0-004-020  03/31/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0382   Reconstruction               0-004-024  11/01/00  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0368   Reconstruction               0-004-027  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0858   Reconstruction               0-004-029  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1135   Reconstruction               0-004-030  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            GW.3-002            0                  04/15/15   04/28/15    Verticon LTD                        
                                                            GW.3-022        2,188                  02/11/16   03/11/16    Verticon LTD                        
                                                            S.2-001       160,000                  04/15/15   04/28/15    Con Tech Construction Technology    
                                                            S.2-005         7,323                  04/15/15   04/28/15    Con Tech Construction Technology    
                                                            S.2-006         4,709                  08/24/15   09/01/15    Con Tech Construction Technology    
                                                            S.2-007        31,183                  08/24/15   09/01/15    Con Tech Construction Technology    
                                                            S.2-009         4,801                  08/24/15   09/01/15    Con Tech Construction Technology    
                                                            S.2-010         4,163                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-011         3,925                  12/15/15   06/29/17    Con Tech Construction Technology    
                                                            S.2-012         4,730                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-015        19,058                  12/15/15   01/08/16    Con Tech Construction Technology    
                                                            S.2-018         4,490                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-024           716                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-16          4,464                  12/15/15   01/11/16    Con Tech Construction Technology    
 
15-1397   Reconstruction               0-004-031  03/18/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0011             -750                  12/12/16   12/27/16    Asbestos Corporation of America     
 
17-0479   Reconstruction               0-004-032  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-007         8,202                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            GW.2-008         -650                  08/07/19   08/13/19    MEYER CONTRACTING                   
                                                            GW.2-012       -1,892                  01/03/20   02/03/20    MEYER CONTRACTING                   
                                                            GW.2-019        4,685                  01/03/20   01/31/20    MEYER CONTRACTING                   
                                                            H.1-001         6,917                  08/07/19   08/20/19    MENGLER MECHANICAL, INC.            
                                                            H.1-002         6,846                  08/07/19   08/20/19    MENGLER MECHANICAL, INC.            
                                                            H.1-003         6,636                  08/07/19   08/20/19    MENGLER MECHANICAL, INC.            
                                                            H.1-004        41,649                  08/07/19   08/20/19    MENGLER MECHANICAL                  
                                                            H.1-005         9,527                  08/07/19   08/20/19    MENGLER MECHANICAL, INC.            
                                                            H.1-010         8,052                  03/11/20   06/29/20    MENGLER MECHANICAL                  
 
16-0803   Reconstruction               0-004-033  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W-01                0                  10/23/17   11/10/17    Window Specialties Inc              
                                                            W-02                0                  03/19/18   03/20/18    Window Specialist Inc.              
                                                            W-03R          -3,793                  10/09/18   10/24/18    WINDOW SPECIALISTS                  
 
19-0093   Reconstruction               0-004-034  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1203   Reconstruction               0-004-035  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1897FP Reconstruction               0-004-FP1  07/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fishkill Elementary School:
90-1376   Reconstruction               0-005-005  05/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0552   Reconstruction               0-005-008  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1517   Reconstruction               0-005-010  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1163   Reconstruction               0-005-011  06/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -37,095                  10/17/02   10/23/02    Barrett Roofing & Supply            
                                                            3              12,000                  03/26/03   04/03/03    Barrett Roofing & Supply            
                                                            4              -3,087                  07/07/04   07/13/04    Barrett Roofing & Supply            
 
11-0369   Reconstruction               0-005-014  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0845   Reconstruction               0-005-015  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-009          12,917                  10/14/14   10/23/14    Con Tech Construction Technology    
 
13-0859   Reconstruction               0-005-016  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1136   Reconstruction               0-005-017  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-1513   Reconstruction               0-005-018  05/15/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,967                  03/24/16   04/11/16    C,B, Strain                         
 
17-0480   Reconstruction               0-005-019  05/03/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0094   Reconstruction               0-005-020  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Vassar Road Elementary:
92-0382   Reconstruction               0-008-008  11/09/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1253   Reconstruction               0-008-009  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1285   Reconstruction               0-008-010  06/06/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0553   Reconstruction               0-008-012  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0300   Reconstruction               0-008-017  10/25/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-03          -4,931                  12/03/07   12/12/07    Best Roofing of NJ                  
 
07-0818   Reconstruction               0-008-018  02/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-01       -11,686                  03/29/10   08/06/10    MENGLER MECHANICAL INC              
 
11-0370   Reconstruction               0-008-019  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0846   Reconstruction               0-008-020  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-004               0                  10/14/14   10/23/14    Con Tech Construction Technology    
 
13-0860   Reconstruction               0-008-021  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1137   Reconstruction               0-008-022  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0481   Reconstruction               0-008-023  05/03/18  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0804   Reconstruction               0-008-024  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW-01          10,799                  10/23/17   11/10/17    Meyer Contracting Corp.             
                                                            GW-02               0                  10/23/17   11/10/17    Meyer Contracting Corp.             
                                                            S5            -15,198                  02/20/19   03/04/19    TILCON NEW YORK,INC.                
 
19-0095   Reconstruction               0-008-025  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roy Ketcham High School:
93-1286   Reconstruction               0-012-011  06/06/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0554   Reconstruction               0-012-012  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1518   Reconstruction               0-012-014  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0750   Reconstruction               0-012-015  03/31/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1425   Additions and Alterations    0-012-018  10/04/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              50,275                  05/01/02   05/30/02    Meyer Contracting                   
                                                            1              27,006                  06/27/02   07/03/02    Mid-Orange Mech.                    
                                                            1             -24,250                  06/25/02   07/03/02    Health & Educational Equip.         
                                                            1              -3,440                  06/25/02   07/03/02    Filingeri Elec.                     
                                                            1               6,600                  07/02/04   07/27/04    H Osterhoudt Excavating             
                                                            1                -164                  07/07/04   07/27/04    Adirondack Cabling                  
                                                            1              -5,000                  07/07/04   07/19/04    Health & Educational Equip.         
                                                            12             24,000                  07/25/03   07/29/03    Meyer Contracting                   
                                                            14              6,235                  07/25/03   07/29/03    Meyer Contracting                   
                                                            15              8,833                  07/25/03   07/29/03    Meyer Contracting                   
                                                            16              5,936                  07/25/03   07/29/03    Meyer Contracting                   
                                                            18              7,104                  07/25/03   07/29/03    Meyer Contracting                   
                                                            19                660                  07/25/03   07/29/03    Meyer Contracting                   
                                                            2               4,239                  05/01/02   05/30/02    Meyer Contracting                   
                                                            2 (rev)        -6,250                  12/03/02   12/09/02    Filingeri Elec.                     
                                                            3              25,500                  03/08/03     /  /      Health & Educational Equip.         
                                                            4                -386                  02/06/03   04/03/03    Meyer Contracting                   
                                                            5              17,101                  01/07/03   01/16/03    Filingeri Elec.                     
                                                            6              15,919                  02/06/03   02/24/03    Meyer Contracting                   
                                                            6              -2,500                  07/07/04   07/19/04    Health & Educational Equip.         
 
02-0808   Reconstruction               0-012-019  12/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                   0                  02/20/03   03/13/03    Royal Cont corp of NY               
 
03-0435   Reconstruction               0-012-020  04/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -5,000                  12/23/05   12/28/05    Netrix inc                          
                                                            1              -6,896                  06/29/07   07/17/07    Glomar Construction                 
 
07-0129   Reconstruction               0-012-021  11/13/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0145   Reconstruction               0-012-022  10/25/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GYMGC01        -3,291                  03/10/10   05/25/10    FORTH SPORT FLOORS INC              
 
07-1771   Reconstruction               0-012-023  09/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01R        -27,056                  03/10/10   05/24/10    RLJ ELECTRIC CORPORATION            
                                                            EC-03          -7,798                  03/29/10   05/10/10    MANNINIO ELECTRIC INC               
 
11-0371   Reconstruction               0-012-027  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0847   Reconstruction               0-012-028  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001           3,385                  10/14/14   10/23/14    Con Tech Construction Technology    
                                                            1-004             418                  10/14/14   10/22/14    Eugene DiLorenzo Inc.               
                                                            1-005          21,744                  10/14/14   10/23/14    Con Tech Construction Technology    
                                                            H-002           3,344                  10/14/14   10/22/14    Southeast Mechanical Corporation    
                                                            H-003           1,942                  10/14/14   10/22/14    Southeast Mechanical Corporaiton    
                                                            R.1-001             0                  04/15/15   04/24/15    NUA Construction Corporation        
                                                            W.2-004       -20,000                  09/19/16   12/16/16    Window Specialist                   
 
13-0861   Reconstruction               0-012-029  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1138   Reconstruction               0-012-030  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.1-011         4,798                  02/11/16   03/16/16    RLJ Electric Corporation            
 
14-1514   Reconstruction               0-012-031  05/15/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0482   Reconstruction               0-012-033  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-001       423,000                  01/03/20   01/21/20    RLJ ELECTRIC CORP.                  
                                                            E.2-003       -18,993                  01/03/20   01/21/20    RLJ ELECTRIC CORP.                  
                                                            E.2-013         9,620                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-014         7,608                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-015         9,527                  06/16/20   07/20/20    ELJ ELECTRIC CORP.                  
                                                            E.2-016         9,805                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-019         8,821                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-023        36,131                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-025         6,291                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-026         6,500                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            GW.2-002            0                  10/09/18   10/29/18    MEYER CONTRACTING                   
                                                            GW.2-006      -12,200                  12/13/19   01/03/20    MEYER CONTRACTING                   
                                                            GW.2-010            0                  08/07/19   08/13/19    MEYER CONTRACTING                   
                                                            GW.2-014        9,819                  01/03/20   02/03/20    MEYER CONTRACTING                   
                                                            GW.2-022        1,189                  03/11/20   07/06/20    MEYER CONTRACTING                   
                                                            H.1-009       -23,300                  08/14/20   09/25/20    MENGLER MECHANICAL                  
                                                            S.2-003         4,691                  10/09/18   10/29/18    ARGENIO BROTHERS                    
                                                            S.2-004             0                  10/09/18   10/29/18    ARGENIO BROTHERS                    
                                                            S.2-006         4,360                  10/09/18   10/29/18    ARGENIO BROTHERS                    
                                                            S.2-008         4,618                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-011         4,406                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-014         6,656                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-015         5,484                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-017        11,560                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-018         3,300                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-019         5,389                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-020         2,737                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-022         3,730                  11/19/18   01/28/19    ARGENIO BROTHERS                    
 
16-0805   Reconstruction               0-012-034  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-02r           4,700                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-03r           4,900                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-04A          21,450                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-04B           5,000                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A12             3,900                  09/14/18   09/20/18    TURCO GOLF INC.                     
                                                            A13             5,000                  08/31/18   09/20/18    TURCO GOLF                          
                                                            A14             3,823                  08/31/18   09/20/18    TURCO GOLF                          
                                                            E-02            1,500                  02/12/18   03/08/18    RLJ Electric Corporation            
 
19-0096   Reconstruction               0-012-035  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0524   Reconstruction               0-012-036  01/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-018          15,700                  12/29/21   01/06/23    PVS Const LLC                       
                                                            E1-001          7,767                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            E1-002          7,250                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            E1-003              0                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            GW1-001             0                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            GW1-003        17,954                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            GW1-004        19,265                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            GW1-005         5,370                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            GW1-006             0                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            GW1-008             0                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            H1-016         38,810                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-02           8,767                  02/07/22   02/09/23    Mengler Mech Inc                    
                                                            H1-022          7,448                  05/05/23   12/28/23    MENGLER MECHANICAL INC              
                                                            H1-024          7,822                  05/05/23   12/28/23    MENGLER MECHANICAL                  
                                                            H1-028          2,795                  05/05/23   12/28/23    MENGLER MECHANICAL                  
                                                            H1-03           9,670                  02/07/22   02/09/23    Mengler Mech Inc                    
                                                            H1-04           8,419                  02/07/22   02/09/23    Mengler Mech Inc                    
                                                            H1-05           3,584                  02/07/22   02/09/23    Mengler Mech Inc                    
                                                            H1-06           8,105                  02/07/22   02/09/23    Mengler Mech Inc                    
                                                            H1-07           6,151                  02/07/22   02/09/23    Mengler Mech Inc                    
 
21-1224   Reconstruction               0-012-037  05/23/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1204   Reconstruction               0-012-038  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1898FP Reconstruction               0-012-FP1  10/21/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0099SC Visual Structural Inspection 0-012-SC1  08/06/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0335SC Visual Structural Inspection 0-012-SC2  12/01/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Brinckerhoff Elementary:
92-1461   Reconstruction               0-013-007  07/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0555   Reconstruction               0-013-009  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1519   Reconstruction               0-013-011  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0301   Reconstruction               0-013-016  10/25/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0819   Reconstruction               0-013-017  02/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -42,300                  03/10/10   08/06/10    RLJ ELECTRIC CORPORATION            
 
11-0372   Reconstruction               0-013-018  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0848   Reconstruction               0-013-019  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-001               0                  10/14/14   10/22/14    Southeast Mechanical Corporation    
 
13-0862   Reconstruction               0-013-020  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1139   Reconstruction               0-013-021  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0483   Reconstruction               0-013-022  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW.2-015       -3,950                  01/03/20   02/03/20    MEYER CONTRACTING                   
 
19-0097   Reconstruction               0-013-023  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0874   Reconstruction               0-013-024  01/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W.3-001         8,745                  11/25/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
                                                            w.3-005             0                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
 
02-1904FP Reconstruction               0-013-FP1  07/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Oak Grove Elementary:
94-0556   Reconstruction               0-014-009  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1520   Reconstruction               0-014-011  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1161   Reconstruction               0-014-012  06/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              14,639                  07/02/04   07/13/04    H Osterhoudt Excavating             
 
07-0820   Reconstruction               0-014-015  02/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-03       -14,396                  03/29/10   08/06/10    MENGLER MECHANICAL INC              
 
07-0808   Reconstruction               0-014-016  11/21/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01          -6,683                  12/10/08   02/19/09    MARPAT CONSTRUCTION COMPANY         
 
11-0373   Reconstruction               0-014-017  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0849   Reconstruction               0-014-018  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-003               0                  10/14/14   10/23/14    Con Tech Construction Technology    
                                                            W.1-02         -7,425                  02/11/16   02/19/16    Window Specialist                   
 
13-0863   Reconstruction               0-014-019  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1140   Reconstruction               0-014-020  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0484   Reconstruction               0-014-021  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW.2-018       -3,000                  01/03/20   01/31/20    MEYER CONTRACTING                   
                                                            S.2-007         4,567                  10/09/18   10/29/18    ARGENIO BROTHERS                    
                                                            S.2-012         4,641                  11/19/18   01/28/19    ARGENIO BROTHERS                    
 
19-0098   Reconstruction               0-014-022  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1205   Reconstruction               0-014-023  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1901FP Reconstruction               0-014-FP1  07/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Gayhead Elementary:
94-0557   Reconstruction               0-016-008  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1537   Reconstruction               0-016-009  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0575   Reconstruction               0-016-014  01/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0150   Reconstruction               0-016-015  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0821   Reconstruction               0-016-016  02/04/08  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0374   Reconstruction               0-016-017  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-1275   Reconstruction               0-016-018  06/18/13  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0864   Reconstruction               0-016-020  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1141   Reconstruction               0-016-021  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S.2-025         4,900                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-027         1,206                  02/11/16   03/14/16    Con Tech Construction Technology    
 
17-0485   Reconstruction               0-016-022  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-005         9,051                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-006         5,843                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
 
16-0806   Reconstruction               0-016-023  02/01/17  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0099   Reconstruction               0-016-024  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0875   Reconstruction               0-016-025  01/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W.3-002         2,849                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
 
02-1902FP Reconstruction               0-016-FP1  10/20/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Van Wyck Junior High School:
93-1225   Reconstruction               0-017-008  05/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1287   Reconstruction               0-017-009  06/06/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0558   Reconstruction               0-017-010  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1524   Reconstruction               0-017-011  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0086   Reconstruction               0-017-014  08/28/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              10,200                  07/08/04   07/13/04    P&D Elec.                           
 
06-0525   Reconstruction               0-017-017  12/01/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01         -16,260                  10/29/08   03/09/09    THOMAS GLEASON                      
 
11-0375   Reconstruction               0-017-020  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0850   Reconstruction               0-017-021  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001               0                  10/14/14   10/23/14    Eugine DiLorenzo Inc.               
                                                            1-002               0                  10/14/14   10/23/14    Eugene DiLorenzo Inc.               
                                                            1-003               0                  01/14/14   10/22/14    Eugene DiLorenzo Inc.               
                                                            2-006           4,090                  12/12/16   12/15/16    Window Specialist                   
                                                            R.2-001        -9,535                  04/15/15   04/24/15    Milcon Construction Corp.           
                                                            R.2-002        -1,995                  04/15/15   04/24/15    Milcon Construction Corp.           
                                                            W.1-002       -14,144                  02/11/16   02/19/16    Window Specialist                   
                                                            W.2-005       -20,000                  09/19/16   12/16/16    Window Specialist                   
 
13-0865   Reconstruction               0-017-022  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1129   Reconstruction               0-017-023  02/24/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1142   Reconstruction               0-017-024  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.1-014        16,043                  01/17/17   08/23/17    RLJ Electric Corporation            
                                                            E1.-004        -3,753                  02/11/16   03/09/16    RLJ Electric Corporation            
                                                            GW.3-003            0                  04/15/15   04/28/15    Verticon LTD                        
                                                            S.2-002             0                  04/15/15   04/28/15    Con Tech Construction Technology    
                                                            S.2-003         4,468                  04/15/15   04/28/15    Con Tech Construction Technology    
                                                            S.2-004         4,291                  04/15/15   04/28/15    Con Tech Construction Technology    
                                                            S.2-008         4,969                  08/24/15   09/01/15    Con Tech Construction Technology    
                                                            S.2-013         4,877                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-014         4,978                  12/15/15   01/15/16    Con Tech Construction Technology    
                                                            S.2-017         6,797                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-020         4,910                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-021         4,869                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-022        16,260                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-023         3,706                  12/15/15   01/11/16    Con Tech Construction Technology    
                                                            S.2-026         4,781                  02/11/16   03/16/16    Con Tech Construction Technology    
                                                            S.2-028         6,300                  12/12/16   12/29/16    Con Tech Construction Technology    
                                                            S.2-19          3,478                  12/15/15   01/11/16    Con Tech Construction Technology    
 
17-0486   Reconstruction               0-017-025  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW.2-016        4,498                  01/03/20   02/03/20    MEYER CONTRACTING                   
 
19-0100   Reconstruction               0-017-026  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0191FP Reconstruction               0-017-FP1  10/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sheafe Road Elementary:
92-0580   Reconstruction               0-018-005  02/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0559   Reconstruction               0-018-006  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1165   Reconstruction               0-018-009  06/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -14,095                  10/17/02   10/23/02    Barrett Roofing and Supply          
 
07-0822   Reconstruction               0-018-012  02/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-02       -20,575                  03/28/10   08/06/10    MENGLER MECHANICAL INC              
 
11-0376   Reconstruction               0-018-013  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0866   Reconstruction               0-018-015  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1143   Reconstruction               0-018-016  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0487   Reconstruction               0-018-017  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW.2-004            0                  10/09/18   10/29/18    MEYER CONTRACTING                   
 
19-0101   Reconstruction               0-018-019  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0876   Reconstruction               0-018-020  01/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W.3-008         2,697                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
 
21-1225   Reconstruction               0-018-021  05/23/22  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1900FP Reconstruction               0-018-FP1  07/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Myers Corners Elementary:
93-1254   Reconstruction               0-019-006  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0560   Reconstruction               0-019-007  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1521   Reconstruction               0-019-009  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1559   Reconstruction               0-019-010  06/25/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1166   Reconstruction               0-019-011  06/06/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,232                  07/02/04   07/13/04    H Osterhoudt Excavating             
                                                            2              17,600                  07/02/04   07/13/04    H Osterhoudt Excavating             
 
98-0751   Reconstruction               0-019-012  03/31/99  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0823   Reconstruction               0-019-016  02/04/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-04       -15,748                  03/29/10   08/06/10    MECHANICAL INC                      
 
11-0377   Reconstruction               0-019-017  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0851   Reconstruction               0-019-018  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-005           6,100                  10/14/14   10/22/14    Eugene DiLorenzo Inc.               
                                                            1-006           2,472                  10/14/14   10/22/14    Eugene DiLorenzo Inc.               
                                                            1-007           3,478                  10/14/14   10/22/14    Eugene DiLorenzo Inc.               
 
13-0867   Reconstruction               0-019-019  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1144   Reconstruction               0-019-020  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0488   Reconstruction               0-019-023  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-012         7,931                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            GW.2-003            0                  10/09/18   10/29/18    MEYER CONTRACTING                   
                                                            S.2-001        59,179                  10/09/18   10/29/18    ARGENIO BROTHERS                    
                                                            S.2-021         5,565                  11/19/18   01/28/19    ARGENIO BROTHERS                    
 
16-0807   Reconstruction               0-019-024  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S2               -337                  02/20/19   03/04/19    TILCON NEW YORK, INC.               
 
19-0102   Reconstruction               0-019-025  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0877   Reconstruction               0-019-026  01/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W.3-004         5,985                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
                                                            W.3-007             0                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
                                                            W.3-010         9,950                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
 
19-0525   Reconstruction               0-019-027  01/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-019           7,920                  12/29/21   01/06/23    PVS Const LLC                       
                                                            E1-004          8,577                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            E1-005              0                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            E1-010         -3,653                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            GW1-002         8,079                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            GW1-007             0                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            H1-010          7,375                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-011              0                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-012          8,739                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-023         -5,693                  05/05/23   12/28/23    MENGLER MECHANICAL INC              
 
21-1226   Reconstruction               0-019-028  05/23/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1206   Reconstruction               0-019-029  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1903FP Reconstruction               0-019-FP1  07/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Jay High School:
92-0292   Reconstruction               0-020-010  10/02/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1542   Reconstruction               0-020-012  07/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1226   Reconstruction               0-020-013  05/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0561   Reconstruction               0-020-015  01/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0055   Reconstruction               0-020-016  08/10/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0043   Reconstruction               0-020-017  07/11/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0752   Reconstruction               0-020-019  03/31/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1426   Additions and Alterations    0-020-022  10/04/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            11             24,125                  07/25/03   07/29/03    Meyer Contracting                   
                                                            13              5,140                  07/25/03   07/29/03    Meyer Contracting                   
                                                            17              3,371                  07/25/03   07/29/03    Meyer Contracting                   
                                                            2               5,422                  07/02/03   07/09/03    Health & Educational Equip.         
                                                            2(rev)         -6,250                  12/03/02   12/09/02    Filingeri Elec.                     
                                                            20                660                  07/25/03   07/29/03    Meyer Contracting                   
                                                            21             49,700                  09/04/03   10/06/03    Meyer Contracting                   
                                                            2A            226,900                  02/12/03   04/21/03    General Mech. Systems               
                                                            2B            226,900                  02/12/03   04/21/03    General Mech. Systems               
                                                            3               7,592                  06/25/02   07/03/02    Meyer Contracting                   
                                                            3               3,258                  02/06/03   02/24/03    General Mech. Systems               
                                                            4               8,794                  02/06/03   02/24/03    Filingeri Elec.                     
                                                            4              21,235                  03/19/03     /  /      Health & Educational Equip.         
                                                            5              29,300                  02/06/03   04/21/03    Meyer Contracting                   
                                                            7               7,169                  02/06/03   02/24/03    Meyer Contracting                   
                                                            7              -2,500                  07/07/04   07/19/04    Health & Educational Equip.         
                                                            8              21,673                  02/06/03   02/24/03    Meyer Contracting                   
 
02-0807   Reconstruction               0-020-023  12/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2               3,629                  07/09/04   07/13/04    Royal Contracting                   
 
04-1339   Reconstruction               0-020-024  08/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1772   Additions and Alterations    0-020-026  09/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-01          -4,500                  03/10/10   05/24/10    DATABASE TELECOMMUNICATIONS INC     
                                                            EC-04          -9,772                  03/29/10   05/10/10    MANNINIO ELECTRIC INC               
                                                            EQ-01          -4,050                  03/10/10   05/24/10    NICKERSON CORPORATION               
                                                            GC-01          16,625                  11/30/09   12/31/09    FOURMEN CONSTRUCTION INC            
                                                            GC-02           5,597                  11/30/09   12/31/09    FOURMEN CONSTRUCTION INC            
                                                            GC-03           3,047                  11/30/09   12/31/09    FOURMEN CONSTRUCTION INC            
                                                            GC-04           3,457                  12/17/09   01/12/10    FOURMEN CONSTRUCTION INC            
                                                            GC-05           8,300                  12/17/09   01/12/10    FOURMEN CONSTRUCTION INC            
                                                            GC-06           8,500                  12/17/09   01/12/10    FOURMEN CONSTRUCTION INC            
                                                            HC-01         -23,501                  03/29/10   05/10/10    WESTECH INTERNATIONAL INC           
                                                            PC-01          14,244                  12/17/09   01/12/10    ASHLEY MECHANICAL INC               
 
07-1747   Reconstruction               0-020-027  05/14/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01           1,927                  03/10/10   02/13/12    ROEHRS CONSTRUCTION                 
                                                            PC-02           4,583                  03/10/10   02/13/12    ROEHRS CONSTRUCTION                 
                                                            PC-03          12,797                  06/24/09   08/14/09    ROEHRS CONSTRUCTION                 
                                                            PC-04          -4,500                  12/17/09   02/13/12    ROEHRS CONSTRUCTION                 
                                                            PC-05          -1,740                  09/17/09   02/13/12    ROEHRS CONSTRUCTION                 
 
11-0378   Reconstruction               0-020-028  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0852   Reconstruction               0-020-029  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-002           3,195                  10/14/14   10/23/14    Con Tech Construction Technology    
                                                            1-006          64,904                  10/14/14   10/23/14    Con Tech Construction Technology    
                                                            1-008          20,066                  10/14/14   10/23/14    Con Tech Construction Technology    
                                                            S.1-010         2,266                  04/15/15   04/24/15    Con Tech Construction Technology    
                                                            S.1-11          4,422                  04/15/15   04/24/15    Con Tech Construction Technology    
 
13-0868   Reconstruction               0-020-030  04/04/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1145   Reconstruction               0-020-031  08/25/14  NO CHANGE ORDERS ON ELECTRONIC FILE
15-1725   Reconstruction               0-020-032  09/08/16  NO CHANGE ORDERS ON ELECTRONIC FILE
17-1780   Reconstruction               0-020-033  12/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              83,703                  02/11/19   06/05/19    AMITY CONSTRUCTION CORP.            
                                                            3              19,487                  02/11/19   06/06/19    AMITY CONSTRUCTION CORP.            
 
17-0489   Reconstruction               0-020-034  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-002       393,000                  01/03/20   01/21/20    RLJ ELECTRIC CORP.                  
                                                            E.2-004         1,363                  01/03/20   01/21/20    RLJ ELECTRIC CORP.                  
                                                            E.2-009         9,101                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-010         8,812                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-011         7,827                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-018         4,500                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-022         9,500                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            E.2-024        36,131                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            GW.2-001            0                  10/09/18   10/29/18    MEYER CONTRACTING                   
                                                            GW.2-007            0                  08/07/19   08/13/19    MEYER CONTRACTING                   
                                                            GW.2-013        6,656                  01/03/20   02/03/20    MEYER CONTRACTING                   
                                                            H.1-006         9,937                  03/11/20   06/29/20    MENGLER MECHANICAL                  
                                                            H.1-007         9,872                  03/11/20   06/29/20    MENGLER MECHANICAL                  
                                                            H.1-008         9,957                  03/11/20   06/29/20    MENGLER MECHANICAL                  
                                                            S.2-002         1,279                  10/09/18   10/29/18    ARGENIO BROTHERS                    
                                                            S.2-005             0                  10/09/18   10/29/18    ARGENIO BROTHERS                    
                                                            S.2-009         4,997                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-010         4,988                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-013         4,203                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-016        21,839                  11/19/18   01/28/19    ARGENIO BROTHERS                    
                                                            S.2-023         7,537                  11/19/18   01/28/19    ARGENIO BROTHERS                    
 
16-0808   Reconstruction               0-020-035  02/01/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-01r           4,750                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-05r           4,697                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-06r           4,745                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-07            4,500                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-08            2,638                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-09           45,497                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-10            4,929                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            A-11            1,760                  02/12/18   03/08/18    Turco Golf Inc.                     
                                                            E-01           19,928                  02/12/18   03/08/18    RLJ Electric Corporation            
                                                            GW-03         -23,000                  10/23/17   11/10/17    Meyer Contracting Corporation       
 
19-0103   Reconstruction               0-020-036  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0878   Reconstruction               0-020-037  01/18/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            W.3-006             0                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
                                                            W.3-009         5,258                  11/24/20   02/19/21    AFI GLASS & ARCHITECTURAL METAL,INC.
 
19-0526   Reconstruction               0-020-039  01/27/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E1-006          9,599                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            E1-007          9,369                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            E1-008          9,813                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            E1-009              0                  05/05/23   12/28/23    RLJ ELECTRIC CORP                   
                                                            GW 1-20        17,600                  12/29/21   01/06/23    PVS Const LLC                       
                                                            GW1-009         5,060                  01/21/21   04/14/21    PVS CONSTRUCTION, LLC               
                                                            GW1-01         17,702                  12/29/21   01/06/23    PVS Construction LLC.               
                                                            GW1-010        68,754                  12/29/21   01/06/23    PVS Const LLC                       
                                                            GW1-012         9,900                  12/29/21   01/06/23    PVS Const LLC                       
                                                            GW1-013             0                  12/29/21   01/06/23    PVS Const LLC                       
                                                            GW1-014        19,391                  12/29/21   01/06/23    PVS Const LLC                       
                                                            GW1-015        16,116                  12/29/21   01/06/23    PVS Const LLC                       
                                                            GW1-016        16,547                  12/29/21   01/06/23    PVS Const LLC                       
                                                            GW1-017         7,194                  12/29/21   01/06/23    PVS Const LLC                       
                                                            H1-01         102,802                  02/07/22   02/09/23    Mengler Mech Inc                    
                                                            H1-013              0                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-014              0                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-015              0                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-017         35,877                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-018         32,143                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-019         23,586                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-020         19,491                  04/27/22   03/23/23    Mengler Mech Inc                    
                                                            H1-021          8,213                  05/05/23   12/28/23    MENGLER MECHANICAL INC              
                                                            H1-025         -8,583                  05/05/23   12/28/23    MENGLER MECHANICAL                  
                                                            H1-026         44,290                  05/05/23   12/28/23    MENGLER MECHANICAL INC              
                                                            H1-027         12,388                  05/05/23   12/28/23    MENGLER MECHANICAL                  
                                                            H1-08           8,995                  02/07/22   02/09/23    Mengler Mech Inc                    
                                                            H1-09           8,995                  02/07/22   02/08/23    Mengler Mech Inc                    
 
20-1741   Reconstruction               0-020-040  06/30/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R-001         -10,000                  12/29/21   02/22/23    Titan Roofing Inc                   
 
21-1227   Reconstruction               0-020-041  05/23/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1207   Reconstruction               0-020-042  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1899FP Reconstruction               0-020-FP1  03/22/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0046SC Visual Structural Inspection 0-020-SC1  08/09/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXVanWyckJrHigh Modulars(sold 2018):
03-1517   New Construction             0-040-001  06/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mods. 1 & 2 @ Gayhead Elem.:
03-1518   New Construction             0-041-001  06/15/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Portable #1 @ Fishkill ES:
07-1624   New Construction             0-046-001  04/02/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Storage @ Ketcham HS:
04-1102   New Construction             2-043-001  06/15/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building @ RC Ketchum:
17-0491   New Construction             2-057-001  05/03/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Facilities & Opps Bldg:
97-1126   Reconstruction               3-015-003  04/06/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1522   Reconstruction               3-015-004  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0015   Reconstruction               3-015-005  08/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0379   Reconstruction               3-015-006  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0104   Reconstruction               3-015-007  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1208   Reconstruction               3-015-008  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Salt Shed:
22-1209   New Construction             3-058-001  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Main Garage #1:
92-0462   Reconstruction               5-007-001  12/18/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1702   Reconstruction               5-007-002  08/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1523   Reconstruction               5-007-004  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0380   Reconstruction               5-007-006  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0490   Reconstruction               5-007-007  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-017         8,608                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
                                                            P.1-001             0                  10/09/18   11/15/18    S & L PLUMBING & HEATING CORP       
 
19-0105   Reconstruction               5-007-008  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Main Garage #2:
92-0798   Reconstruction               5-011-002  03/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0381   Reconstruction               5-011-004  06/29/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0853   Reconstruction               5-011-005  04/03/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            R.1-002        14,223                  04/15/15   04/24/15    NUA Construction Corporation        
 
19-0106   Reconstruction               5-011-007  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage (lease):
04-0483   Reconstruction               5-038-L02  11/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Fishkill Plains Bus Garage:
13-1146   New Construction             5-047-001  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            E.1-001         4,351                  02/11/16   03/21/16    RLJ Electric Corporation            
                                                            E.1-002         3,734                  02/11/16   03/21/16    RLJ Electric Corporation            
                                                            E.1-003         3,907                  02/11/16   03/21/16    RLJ Electric Corporation            
                                                            E.1-006         3,631                  02/11/16   03/21/16    RLJ Electric Corporation            
                                                            E.1-013          -418                  02/11/16   03/09/16    RLJ Electric Corporation            
                                                            GW.3-004       21,580                  04/15/15   04/28/15    Verticon LTD                        
                                                            GW.3-005        6,609                  08/24/15   09/01/15    Verticon LTD                        
                                                            GW.3-006        4,618                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-007        4,870                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-008        4,262                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-009        3,874                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-01             0                  04/15/15   04/28/15    Vericon LTD                         
                                                            GW.3-010        6,982                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-011        4,994                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-012        4,881                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-013        4,419                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-014        2,233                  02/11/16   03/16/16    Verticon LTD                        
                                                            GW.3-028        3,524                  09/19/16   11/02/16    Verticon LTD                        
                                                            GW.3-031        4,395                  09/19/16   11/02/16    Verticon LTD                        
                                                            GW.3-032        4,800                  09/19/16   11/02/16    Verticon LTD                        
                                                            GW.3-033        3,532                  09/19/16   11/02/16    Verticon LTD                        
                                                            H.2-001             0                  04/15/15   04/28/15    Ashley Mechanical Incorporated      
                                                            H.2-005             0                  08/24/15   09/01/15    Ashley Mechanical Incorporated      
                                                            H.2-006         4,888                  12/15/15   01/13/16    Ashley Mechanical Incorporated      
                                                            H.2-013         4,291                  12/15/15   01/08/16    Ashley Mechanical Incorporated      
                                                            H.2-014         3,318                  05/02/16   07/07/16    Ashley McGraw Incorporated          
                                                            P.1-003         3,025                  08/24/15   09/01/15    Southeast Plumbing Corporation      
                                                            P.1-004         4,698                  08/24/15   09/01/15    Southeast Plumbing Corporation      
                                                            P.1-005        24,366                  08/24/15   09/01/15    Southeast Plumbing Corporation      
                                                            P.1-006         3,886                  12/15/15   01/11/16    Southeast Plumbing Corporation      
                                                            P.1-007           861                  12/15/15   01/11/16    Southeast Plumbing Corporation      
                                                            P.1-01         -2,693                  04/15/15   04/28/15    Southeast Plumbing Corporation      
 
19-0107   Reconstruction               5-047-002  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sewer Treatment Plant:
17-1781   Reconstruction               7-021-002  12/17/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004             4,950                  03/25/19   06/05/19    AMITY CONSTRUCTION CORP             
                                                            005             4,950                  03/25/19   06/05/19    AMITY CONSTRUCTION CORP             
                                                            006             3,000                  03/25/19   06/05/19    AMITY CONSTRUCTION CORP             
                                                            007             3,000                  03/25/19   06/05/19    AMITY CONSTRUCTION CORP             
                                                            10              4,975                  02/11/19   06/06/19    AMITY CONSTRUCTION CORP.            
                                                            11            -27,994                  02/11/19   06/06/19    AMITY CONSTRUCTION CORP.            
                                                            12             11,500                  02/11/19   06/06/19    AMITY CONSTRUCTION CORP.            
                                                            2             107,037                  03/25/19     /  /      AMITY CONSTRUCTION CORP.            
                                                            2             107,037                  03/25/19     /  /      AMITYVILLE CONSTRUCTION CORP.       
                                                            8               1,050                  02/11/19   06/06/19    AMITY CONSTRUCTION CORP.            
                                                            9                 620                  02/11/19   06/06/19    AMITY CONSTRUCTION CORP.            
 

          John Jay HS Field House:
15-0869   Reconstruction               7-026-001  08/23/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                 660                  09/28/17   10/10/17    PVS Construction                    
                                                            2               3,960                  09/28/17   10/10/17    PVS Construction                    
                                                            3               2,835                  09/28/17   10/10/17    PVS Construction                    
                                                            4               1,075                  02/23/18   03/07/18    PVS Construction                    
 
17-0492   Reconstruction               7-026-002  05/03/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E.2-020       -10,901                  06/16/20   07/20/20    RLJ ELECTRIC CORP.                  
 

          Transportation Driver Check-In Bldg:
13-1147   New Construction             7-051-001  08/25/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P.1-002         4,223                  08/24/15   09/01/15    Southeast Plumbing Corporation      
 

          Dugout 2 -John Jay HS:
15-0511   New Construction             7-053-001  01/12/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            006             2,651                  07/18/16   09/30/16    PVS CONSTRUCTION                    
 

          Dugout - John Jay HS:
15-0512   New Construction             7-054-001  01/12/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
15-1703   Reconstruction               7-999-004  06/10/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -4,550                  01/17/17   08/23/17    Black Electric                      
                                                            002             2,175                  01/17/17   08/23/17    Black Electric                      
                                                            1               1,603                  09/28/17   10/12/17    RLJ Electric Corporation            
                                                            2             -10,000                  09/28/17   10/12/17    RLJ Electric Corporation            
                                                            3A              4,875                  06/26/17   10/30/17    Black Electric                      
                                                            3B              4,875                  06/26/17   10/30/17    Black Electric                      
                                                            3C              1,825                  06/26/17   10/30/17    Black Electric                      
                                                            4               4,800                  10/10/17   10/31/17    Black Electric                      
                                                            5              -3,000                  10/10/17   10/31/17    Black Electric                      
 
16-1827   Reconstruction               7-999-005  01/23/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GW.1-001            0                  01/06/20   02/13/20    BARONE CONSTRUCTION GROUP, INC.     
                                                            GW.1-002       -4,982                  01/06/20   02/13/20    BARONE CONSTRUCTION GROUP, INC.     
                                                            GW.1-003      -12,531                  01/06/20   02/13/20    BARONE CONSTRUCTION GROUP, INC.     
                                                            GW.2-001            0                  01/06/20   02/13/20    PVS CONSTRUCTION LLC                
                                                            GW.2-002            0                  01/06/20   02/13/20    PVS CONSTRUCTION LLC                
                                                            GW.2-003        1,675                  01/06/20   02/13/20    PVS CONSTRUCTION LLC                
                                                            GW.2-004        4,935                  01/06/20   02/13/20    PVS CONSTRUCTION LLC                
                                                            GW.2-005        9,361                  01/06/20   02/13/20    PVS CONSTRUCTION LLC                
                                                            GW.2-006        3,614                  01/06/20   02/13/20    PVS CONSTRUCTION LLC                
                                                            GW.2-007        1,600                  01/06/20   02/13/20    PVS CONSTRUCTION LLC                
 
94-1338EP Energy Project               7-999-E01  03/30/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dist. Office/Alt. HS @ 25 Corp Pk Dr:
19-0108   Reconstruction               8-052-002  09/20/19  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1210   Reconstruction               8-052-004  04/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

MILLBROOK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-22-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Millbrook Middle School:
02-2403   Reconstruction               0-008-002  06/25/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01         -77,000                  02/22/05   04/04/05    Laumar Roofing Co                   
 
97-0227   Reconstruction               0-008-003  08/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1006   Additions and Alterations    0-008-004  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0043   Reconstruction               0-008-006  07/26/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-001        -11,136                  03/27/08   04/02/08    TUSCAN CONTRACTORS & CONSULTANTS    
                                                            GC-01           3,000                  01/05/05   01/20/05    Netrix Inc                          
 
07-1996   Reconstruction               0-008-008  05/22/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01         -10,000                  03/22/12   10/23/12    D&S ABATEMENT INC                   
                                                            PC-01          19,750                  03/13/12   10/23/12    GANNON'S PLUMBING AND HEATING       
                                                            SC-01          -3,780                  11/15/11   10/23/12    PROFEX INC                          
 
08-1066   Reconstruction               0-008-009  03/24/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1007   Reconstruction               0-008-010  07/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SC-01R         -4,913                  12/22/14   01/13/15    Landscape Unlimited, Inc.           
 
11-1334   Reconstruction               0-008-011  10/12/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          11,388                  03/19/13   06/18/13    MARTIN ENVIRONMENTAL SERVICES INC   
                                                            AC-02          16,577                  12/11/14   12/18/14    Martin Environmental Services, Inc. 
                                                            EC-01          -1,844                  12/26/14   01/07/15    RLJ Electric Corporation            
                                                            EC-02          -2,647                  12/22/14   12/31/14    RLJ Electric Corporation            
                                                            GC-01R         25,360                  04/17/14   05/22/14    PROFEX INC                          
                                                            GC-02          -1,844                  07/31/14   08/27/14    Profex, Inc.                        
                                                            GC-03            -573                  12/26/14   01/07/15    Profex, Inc.                        
                                                            HC-02          -3,811                  07/16/14   08/15/14    Mengler Mechanical, Inc.            
                                                            HC-03         -41,287                  07/16/14   08/15/14    Mengler Mechanical, Inc.            
 
15-1445   Reconstruction               0-008-013  04/08/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1            -100,000                  06/27/16   07/07/16    Profex, Inc.                        
 
16-2108   Reconstruction               0-008-014  08/07/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           11,000                  10/30/17   11/24/17    Mancon, LLC                         
 
17-1782   Reconstruction               0-008-015  06/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0314FP Reconstruction               0-008-FP1  11/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0609SC Visual Structural Inspection 0-008-SC1  06/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elm Drive Elementary School:
90-1560   Reconstruction               0-010-004  06/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0146   Additions and Alterations    0-010-005  09/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1528   Reconstruction               0-010-007  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1106   Reconstruction               0-010-009  01/31/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M-01           14,967                  08/22/03   09/05/03    PIttsfield Pipers                   
 
04-0044   Reconstruction               0-010-010  07/26/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02           1,075                  01/05/05   01/20/05    Netrix inc                          
 
08-1067   Reconstruction               0-010-011  03/24/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1009   Reconstruction               0-010-012  04/18/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            RC-02         -33,200                  03/19/13   06/06/13    PUFF INC                            
 
17-1745   Reconstruction               0-010-014  06/04/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1597   Reconstruction               0-010-015  12/18/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            2,550                  05/01/19   07/02/19    PROFEX, INC.                        
 
20-0139   Reconstruction               0-010-016  09/30/20  NO CHANGE ORDERS ON ELECTRONIC FILE
20-1688   Reconstruction               0-010-017  07/10/21  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0611SC Visual Structural Inspection 0-010-SC1  06/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Alden Place Elementary:
90-1882   Reconstruction               0-011-001  07/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0145   Additions and Alterations    0-011-001  09/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1561   Reconstruction               0-011-004  06/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1529   Reconstruction               0-011-006  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1506   Reconstruction               0-011-007  05/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1725   Reconstruction               0-011-009  02/29/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-1068   Reconstruction               0-011-010  03/24/10  NO CHANGE ORDERS ON ELECTRONIC FILE
11-1010   Reconstruction               0-011-011  04/18/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01R        -37,575                  03/19/13   06/06/13    PUFF INC                            
 
11-1011   Reconstruction               0-011-012  07/31/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          -2,000                  03/20/13   06/05/13    NEOPLANTA RESTORATION INC           
                                                            HC-01         -12,000                  02/21/14   04/15/14    Ashley Mechanical, Inc.             
 
11-1326   Reconstruction               0-011-013  10/03/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AC-03          21,440                  12/11/14   12/18/14    Martin Environmental Services, Inc. 
                                                            HC-01          -3,229                  07/16/14   08/27/14    Mengler Mechanical, Inc.            
 
15-1914   Reconstruction               0-011-015  07/05/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           -3,600                  10/21/16     /  /      Profex, Inc.                        
                                                            1-02           -3,500                  12/22/16   01/05/17    Profex, Inc.                        
 
16-1812   Reconstruction               0-011-016  06/23/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            5,900                  10/23/17   11/06/17    Mid-State Industries, LTD           
 
18-2036   Reconstruction               0-011-017  07/02/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -18,000                  10/03/19   12/31/19    TRANSITIONAL BUILDERS, INC.         
 
18-2057   Reconstruction               0-011-018  07/01/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -11,000                  10/14/20   11/13/20    PROFEX, INC.                        
 
20-0140   Reconstruction               0-011-019  09/30/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01           26,512                  04/12/21   07/12/21    J&J SASS ELECTRIC, INC.             
                                                            1-02          128,785                  06/08/21   03/29/22    J&J Sass Electric Inc               
                                                            1-03          134,875                  06/08/21   10/19/21    J&J Sass Electric Inc               
 
06-0610SC Visual Structural Inspection 0-011-SC1  06/25/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Millbrook High School:
04-0602   New Construction             0-031-001  03/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CO-FEC01       -2,696                  11/08/07   11/08/07    Buffalo Hotel Supply Company        
                                                            CO-M008        10,104                  12/31/07   01/09/08    General Mechanical Systems          
                                                            EC-002         19,839                  04/09/07   04/23/07    P and D Electric of the Hudson Valle
                                                            EC-003         10,210                  04/14/08   01/30/12    P&D ELECTRIC OF HUDSON VALLEY INC.  
                                                            EC-01          19,910                  04/09/07   04/23/07    P and D Electric of the Hudson Valle
                                                            GC-002         23,050                  10/03/06   11/03/06    Ferrari and Sons                    
                                                            GC-003         59,936                  10/03/06   11/03/06    Ferrari and Sons                    
                                                            GC-004          5,000                  10/03/06   10/10/06    Ferrari and sons                    
                                                            GC-004          5,000                  04/14/08     /  /      FERRARI & SONS, INC.                
                                                            GC-005         29,435                  10/03/06   11/03/06    Ferrari Sons                        
                                                            GC-006         35,425                  10/03/06   11/03/06    Ferrari and Sons                    
                                                            GC-007         32,900                  10/03/06   11/03/06    Ferrari sons                        
                                                            GC-008          2,498                  04/09/07   05/15/07    Ferrari and Sons                    
                                                            GC-009         19,982                  04/09/07   05/15/07    Ferrari and Sons                    
                                                            GC-01         190,000                  01/17/06   06/30/06    Ferrari and Sons                    
                                                            M-001         129,929                  10/03/06     /  /      General Mechanical systems          
                                                            M-001         129,929                  04/14/08     /  /      GENERAL MECHANCIAL SYSTEMS, INC.    
                                                            M-002          15,526                  04/09/07   04/23/07    General Mechanical Systems          
                                                            M-003           2,917                  04/09/07   04/23/07    General Mechanical Systems          
                                                            M-004          19,525                  04/09/07   04/23/07    General Mechanical Systemssr        
                                                            M-005          11,353                  04/09/07   08/07/07    General Mechanical Systems          
                                                            M-006          13,861                  04/09/07   04/23/07    General Mechanical Systems          
                                                            M-007           7,315                  05/18/07   08/01/07    General Mechanical                  
                                                            PC-01           5,210                  05/18/07   08/01/07    General Mechanical                  
                                                            PC-02           9,142                  05/18/07   08/01/07    General Mechanical Systems          
                                                            S-002          34,000                  10/03/06   02/13/09    SUN UP ENTERPRISES                  
                                                            S-002          34,000                  04/14/08     /  /      SUN UP ENETERPRISES, INC.           
                                                            S-003         182,000                  10/03/06     /  /      Sun Up Enterprises                  
                                                            S-003         182,000                  04/14/08     /  /      SUN UP ENTERPRISES, INC.            
                                                            S-004          23,400                  10/03/06   10/24/06    sun Up enterprises                  
                                                            S-005          17,650                  04/09/07   05/15/07    Sun Up Enterprises                  
                                                            S-006           4,125                  04/09/07   05/15/07    Sun Up Enterprises                  
                                                            S-007          21,885                  04/09/07   05/15/07    Sun Up Enterprises                  
                                                            S-008          19,350                  04/09/07   05/15/07    Sun Up Enterprises                  
                                                            S-01          113,282                  01/17/06   06/30/06    Sun Up Enterprises                  
 
12-0080   Reconstruction               0-031-002  08/02/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         247,222                  05/14/13   01/27/14    HUDSON VALLEY EC&M INC              
                                                            EC-02           6,569                  06/17/13   12/04/13    Hudson Valley Electrical Constructio
                                                            EC-03          18,209                  09/17/13   02/03/14    Hudson Valley Electrical Constructio
                                                            EC-03          18,209                  03/12/14   05/30/14    Hudson Valley E. C & M              
                                                            EC-04           1,394                  09/17/13   12/04/13    Hudson Valley E C & M               
                                                            EC-04           1,394                  03/14/14   05/30/14    Hudson Valley E C & M               
 
20-1655   Reconstruction               0-031-003  07/10/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01          -11,940                  09/07/22   08/22/23    Ferrari & Sons Inc                  
                                                            1-02            8,800                  09/07/22   08/22/23    Ferrari&Sons Inc                    
                                                            1-03            5,900                  09/07/22   08/22/23    Ferrari&Sons Inc                    
 
22-0204   Reconstruction               0-031-004  12/17/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            1-01            4,750                  07/12/23     /  /      CON-TECH CONSTRUCTION TECH          
 

          Press Box:
11-1008   New Construction             7-032-001  07/23/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BC-01          -6,500                  09/17/13   02/03/14    Schultz Industeries, IC.,           
 

BOCES DUTCHESS STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-90-00-00
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Salt Point Center(frmly Spec ed ctr):
91-0782   Reconstruction               0-001-008  02/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1107   Reconstruction               0-001-009  05/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1667   Reconstruction               0-001-011  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0982   Reconstruction               0-001-012  10/02/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            9,292                  10/10/03   10/14/03    West Bank Contracting               
                                                            MC-1           -6,360                  10/09/03   10/14/03    Westech International               
                                                            MC-2            9,090                  10/09/03   10/14/03    Westech International               
 
95-1420   Reconstruction               0-001-013  06/13/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0790   Reconstruction               0-001-014  02/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1638   Reconstruction               0-001-015  08/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1283   Reconstruction               0-001-016  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1404   Reconstruction               0-001-017  07/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1527   Reconstruction               0-001-018  11/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-EC              763                  01/17/03   02/06/03    P&D Elec.                           
                                                            3-EC            2,495                  01/17/03   02/06/03    P&D Elec.                           
                                                            3-GC            1,325                  09/17/03   09/23/03    Profex, Inc.                        
                                                            5-EC            5,877                  04/16/03   06/30/03    P&D Elec.                           
                                                            EC-6            1,752                  08/26/03   09/19/03    P&D Elec.                           
 
05-0781   Reconstruction               0-001-020  04/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001         -22,000                  06/08/06   07/26/06    William Manfredi Construction       
                                                            1-002          -6,825                  06/15/06   06/30/06    William Manfredi Construction       
                                                            2-001          -2,195                  06/08/06   09/29/06    CB Strain and Sons                  
                                                            3-001          -3,950                  06/08/06   09/29/06    CB Strain and Son                   
                                                            4-001          -2,800                  06/08/06   09/29/06    Sausto Contracting                  
                                                            4-002           6,825                  06/15/06   09/29/06    Sausto contracting                  
                                                            5-001          -5,262                  08/16/06   09/06/06    Kittredge Equipment                 
 
06-0078   Reconstruction               0-001-022  11/07/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,376                  02/05/09   03/11/09    HUDSON VALLEY ECM INC.              
                                                            002            -8,575                  05/21/09   08/19/09    HUDSON VALLEY ELECTRICAL CONSTRUCTIO
 
06-0076   Reconstruction               0-001-023  10/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,000                  12/17/07   01/07/08    C.B. Strain                         
                                                            001            -3,655                  02/14/08   03/19/08    FRAN CORP DBA ALL BRIGHT ELECTRIC   
                                                            1              -7,180                  02/14/08   03/19/08    UNITY MECHANICAL CORP               
 
08-1605   Reconstruction               0-001-024  05/14/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             2,300                  10/19/09   11/18/09    MILCON CONSTRUCTION CORPORATION     
 
11-1300   Reconstruction               0-001-025  05/18/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             6,000                  11/02/12   07/02/13    ASHLEY MECHANICAL INC               
 
13-1506   Reconstruction               0-001-026  09/22/14  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0464   Reconstruction               0-001-027  02/24/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-001            949                  12/14/20   02/22/21    UPSTATE ELECTRICAL, LLC             
                                                            EC-002          2,385                  03/30/21   05/12/21    UPSTATE ELECTRICAL, LLC             
                                                            EC-003          1,923                  08/31/21   06/07/22    UPSTATE ELECTRICAL, LLC             
                                                            EC-004          9,735                  08/31/21   06/07/22    UPSTATE ELECTRICAL, LLC             
                                                            EC-005        -26,825                  10/29/21   12/07/22    Upstate Electrical, LLC             
                                                            EC-006          2,420                  03/25/22   01/31/23    Upstate Elec LLC                    
                                                            GC-001          4,308                  11/09/20   02/11/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-002          5,832                  11/09/20   02/11/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-003          3,285                  12/08/20   03/10/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-004         22,947                  10/29/21   12/07/22    Worth Const Co, Inc                 
                                                            GC-005            575                  03/10/23   12/18/23    WORTH CONST CO INC                  
                                                            GC-006          4,006                  03/10/23   12/18/23    WORTH CONST CO INC                  
                                                            PC-001          1,041                  11/12/20   02/16/21    S&O PLUMBING SERVICE, INC.          
                                                            PC-002         -3,900                  12/03/21   09/20/22    S & O Const Services Inc            
                                                            SC-002          3,500                  01/21/22   01/31/23    Amity Const Corp                    
                                                            Site-001        3,960                  10/18/21   12/05/22    Amity Const Corp                    
 
19-1903   Reconstruction               0-001-028  08/18/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Area Occupational Center:
90-1381   Reconstruction               0-003-008  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1109   Reconstruction               0-003-011  05/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1108   Reconstruction               0-003-012  05/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1668   Reconstruction               0-003-013  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0991   Reconstruction               0-003-014  04/01/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0792   Reconstruction               0-003-015  02/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1284   Reconstruction               0-003-017  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1405   Reconstruction               0-003-018  07/29/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0983   Reconstruction               0-003-019  10/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1528   Reconstruction               0-003-020  11/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-2            6,820                  12/13/04     /  /      Westbank Contracting                
 
06-0077   Reconstruction               0-003-022  10/26/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -3,655                  02/05/09   08/21/09    FRAN CORP. DBA ALL BRIGHT ELECTRIC  
                                                            001            -5,000                  02/05/09   08/21/09    C.B. STRAIN & SON, INC.             
                                                            HV-2           12,655                  03/20/08   04/04/08    Unity Mechanical Corp.              
 
11-0415   Reconstruction               0-003-023  12/16/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,557                  11/02/12   03/08/13    MARFI CONTRACTING CORP              
                                                            002             7,536                  02/27/13   05/13/13    MARFI CONTRACTING CORP              
                                                            003            -3,400                  02/27/13   05/13/13    MARFI CONTRACTING CORP              
 
11-1301   Reconstruction               0-003-024  05/18/12  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0762   Reconstruction               0-003-025  04/14/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             1,507                  02/05/15   02/10/15    J & J Sass Electric, Inc.           
                                                            001             1,507                  03/26/19   03/26/19    J&J SASS ELECTRIC, INC.             
                                                            001             1,507                  03/29/19   03/29/19    J&J SASS ELECTRIC, INC.             
                                                            002             3,858                  02/05/15   02/10/15    J & J Sass Electric, Inc.           
                                                            002             3,858                  03/26/19   03/26/19    J&J SASS ELECTRIC, INC.             
                                                            002             3,858                  03/29/19   03/29/19    J&J SASS ELECTRIC, INC.             
 
17-0025   Reconstruction               0-003-026  06/07/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0465   Additions and Alterations    0-003-027  02/24/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004            50,064                  12/03/21   12/21/22    Amity Const Corp                    
                                                            005             3,008                  12/03/21   09/20/22    Amity Const Corp                    
                                                            006            76,980                  12/03/21   09/20/22    Amity Const Corp                    
                                                            007               269                  12/03/21   09/20/22    Amity Const Corp                    
                                                            CTI-008         2,201                  12/03/21   09/20/22    Amity Const Corp                    
                                                            EC-001            949                  12/14/20   02/22/21    UPSTATE ELECTRICAL, LLC             
                                                            EC-002          2,564                  01/12/21   03/12/21    UPSTATE ELECTRICAL, LLC             
                                                            EC-003          4,089                  04/09/21   07/15/21    UPSTATE ELECTRICAL, LLC             
                                                            EC-004        -16,992                  05/06/21   08/27/21    UPSTATE ELECTRICAL, LLC             
                                                            EC-005          3,300                  07/15/21   12/14/21    Upstate Electrical LLC              
                                                            EC-006          4,081                  06/29/21   11/16/21    Upstate Electrical LLC              
                                                            EC-007          1,477                  09/21/21   06/16/22    Upstate Electrical, LLC             
                                                            EC-008         14,163                  09/21/21   06/16/22    Upstate Electrical, LLC             
                                                            EC-009          7,300                  09/21/21   06/16/22    Upstate Electrical, LLC             
                                                            EC-010          4,570                  09/21/21   06/16/22    Upstate Electric, LLC               
                                                            EC-011         78,961                  12/22/21   01/10/23    UPSTATE ELECTRICAL                  
                                                            EC-012         78,691                  12/22/21   01/10/23    UPSTATE EKECTRICAL                  
                                                            EC-013          8,967                  01/21/22   11/15/22    Upstate Elec LLC                    
                                                            EC-014         11,956                  12/22/01   01/10/23    UPSTATE ELECTRICAL                  
                                                            EC-015          3,270                  12/22/21   01/10/23    UPSTATE ELECTRICAL                  
                                                            EC-016          1,158                  01/21/22   11/15/22    Upstate Elec LLC                    
                                                            EC-017          2,990                  10/24/22   01/25/23    Upstate Elec LLC                    
                                                            EC-018          7,619                  01/21/22   11/15/22    Upstate Elec LLC                    
                                                            EC-019         22,013                  01/21/22   11/15/22    Upstate Elec LLC                    
                                                            EC-020          4,420                  01/21/22   11/15/22    Upstate Elec LLC                    
                                                            EC-021         29,510                  02/24/22   03/27/23    Upstate Elec LLC                    
                                                            EC-022          7,050                  02/24/22   03/27/23    Upstate Elec LLC                    
                                                            EC-023         -2,943                  05/09/22   03/13/23    Upstate Elec LLC                    
                                                            EC-024          4,057                  06/13/22   05/01/23    Upstate Elec LLC                    
                                                            EC-025          1,150                  09/22/22   10/31/23    Upstate Elec LLC                    
                                                            EC-026            702                  09/22/22   10/31/23    Upstate Elec LLC                    
                                                            EC-027            731                  09/22/22   10/31/23    Upstate Elec LLC                    
                                                            EC-028          1,518                  09/30/22   07/18/23    Upstate Elec LLC                    
                                                            EC-029          5,826                  09/22/22   10/31/23    Upstate Elec LLC                    
                                                            EC-030          1,226                  11/29/22   06/01/23    Upstate Elec LLC                    
                                                            EC-031          1,094                  11/29/22   06/01/23    Upstate Elec LLC                    
                                                            EC-032          1,347                  11/29/22   06/01/23    Upstate Elec LLC                    
                                                            EC-033         10,713                  11/29/22   06/01/23    Upstate Elec LLC                    
                                                            EC-034            500                  11/29/22   06/01/23    Upstate Elec LLC                    
                                                            EC-035          1,025                  12/19/22   12/01/23    Upstate Elec LLC                    
                                                            EC-036          1,590                  12/19/22     /  /      Upstate Elec LLC                    
                                                            EC-037            627                  12/19/22   12/01/23    Upstate Elec LLC                    
                                                            EC-038          8,336                  12/19/22   12/01/23    Upstate Elec LLC                    
                                                            EC-039         17,695                  12/19/22   12/01/23    Upstate Elec LLC                    
                                                            EC-040          2,335                  12/19/22   12/01/23    Upstate Elec LLC                    
                                                            EC-041            530                  12/19/22   12/01/23    Upstate Elec LLC                    
                                                            EC-042          9,429                  09/05/23   01/08/24    UPSTATE ELECTRICAL                  
                                                            EC-043         14,588                  05/05/23   12/28/23    UPSTATE ELECTRIC                    
                                                            EC-044          2,541                  05/15/23   12/28/23    UPSTATE ELECTRICAL                  
                                                            EC-045           -947                  05/15/23   12/29/23    UPSTATE ELECTRICAL                  
                                                            GC-001         44,193                  09/28/20   11/27/20    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-002          1,197                  09/28/20   11/27/20    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-003          1,726                  11/19/20   01/29/21    WORTH CONSTRUCTION CO,INC.          
                                                            GC-004          6,194                  11/10/20   02/18/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-005          5,832                  11/09/20   03/08/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-006          3,655                  11/19/20   01/29/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-007          2,490                  11/19/20   01/29/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-008          6,917                  12/08/20   02/16/21    WORTH CONSTRUCTION CO., INC.        
                                                            GC-009          4,312                  12/14/20   03/05/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-010          3,232                  01/12/21   06/15/21    WORTH CONSTRUCTION CO.,INC.         
                                                            GC-011          2,980                  01/12/21   06/15/21    WORTH CONSTRUCTION CO., INC.        
                                                            GC-012           -189                  03/19/21   05/11/21    WORTH CONSTRUCTION CO., INC.        
                                                            GC-013         26,106                  03/15/21   05/13/21    WORTH CONSTRUCTION CO., INC.        
                                                            GC-014          4,349                  03/15/21   05/13/21    WORTH CONSTRUCTION CO., INC.        
                                                            GC-015         10,844                  04/09/21   05/18/21    WORTH CONSTRUCTION CO., LLC         
                                                            GC-016       -180,337                  05/06/21   05/20/21    WORTH CONSTRUCTION CO., INC.        
                                                            GC-017       -113,485                  05/06/21   05/20/21    WORTH CONSTRUCTION CO., INC.        
                                                            GC-018          9,394                  06/03/21   01/13/22    WORTH CONST                         
                                                            GC-019         19,172                  06/03/21   09/28/21    WORTH CIONST                        
                                                            GC-020         24,683                  07/15/21   12/30/21    Worth Construction Co.Inc           
                                                            GC-021         10,556                  09/21/21   12/01/22    Worth Construction Co, Inc          
                                                            GC-022          4,399                  10/18/21   08/02/22    Worth Const Co, Inc                 
                                                            GC-023          1,843                  09/21/21   12/01/22    Worth Construction Co, Inc          
                                                            GC-024          9,770                  09/21/21   12/01/22    Worth Construction Co, Inc          
                                                            GC-025         20,500                  10/29/21   12/07/22    Worth Const Co Inc                  
                                                            GC-026          5,485                  10/29/21   12/07/22    Worth Const Co, Inc                 
                                                            GC-027            249                  10/29/21   12/07/22    Worth Const Co, Inc                 
                                                            GC-028          5,339                  10/29/21   12/07/22    Worth Const Co, Inc                 
                                                            GC-029         10,816                  01/21/22   01/31/23    Worth Const Co Inc                  
                                                            GC-030          1,273                  10/14/22   12/14/23    Worth Const Co Inc                  
                                                            GC-031            981                  10/14/22   12/14/23    Worth Const Co Inc                  
                                                            GC-032          2,477                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-033        -21,171                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-034          1,345                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-035          3,115                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-036          3,822                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-037          1,177                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-038          1,459                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-039         17,650                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-040          8,453                  05/05/23     /  /      WORTH CONSTRUCTION CO               
                                                            GC-041          2,846                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-042         14,962                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-043          1,274                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-044         23,790                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-045          1,440                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-046          3,651                  11/29/22   12/13/23    Worth Const Co Inc                  
                                                            GC-047            423                  11/29/22   12/13/23    Worth Const Co Inc                  
                                                            GC-048          7,591                  11/29/22   12/13/23    Worth Const Co Inc                  
                                                            GC-049            803                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-050          4,117                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-051          4,608                  05/05/23   12/28/23    WORTH CONSTRUCTION CO               
                                                            GC-052        -14,669                  03/23/32   12/19/23    WORTH CONSTRUCTION CO.INC           
                                                            GC-053         -1,500                  03/23/23   12/19/23    WORTH CONSTRUCTION CO. INC          
                                                            GC-054         -1,600                  05/15/23   12/27/23    THE PALOMBO GROUP                   
                                                            GC-055         -1,000                  05/15/23   12/27/23    WORTH CONSTRUCTION                  
                                                            GC-056            947                  05/15/23   12/27/23    WORTH CONSTRUCTION                  
                                                            GC-057          5,623                  05/15/23   12/27/23    WORTH CONSTRUCTION CO               
                                                            GC-058        -39,709                  05/15/23   12/27/23    WORTH CONSTRUCTION CO               
                                                            HM-001         35,910                  03/15/21   05/13/21    UNITED SAFETY, LLC                  
                                                            HM-002         23,150                  09/29/21   12/02/22    United Safety, LLC                  
                                                            HM-003         11,740                  09/21/21   06/16/22    United Safety, LLC                  
                                                            HM-004          2,363                  09/21/21   06/16/22    United Safety, LLC                  
                                                            HM-005          6,281                  10/25/21     /  /      United Safety, LLC                  
                                                            HM-006         40,973                  01/10/23   12/11/23    UNITED SAFETY LLC                   
                                                            HM-007          1,750                  01/10/23   12/11/23    UNITED SAFETY LLC                   
                                                            MC-001            493                  12/14/20   02/22/21    CB STRAIN                           
                                                            MC-002        -85,500                  12/03/21   09/20/22    CB Stain                            
                                                            MC-003          5,449                  12/03/21   09/20/22    CB Stain                            
                                                            MC-004          3,386                  12/03/21   09/20/22    C.B Strain                          
                                                            MC-005            825                  12/03/21   09/20/22    C.B Strain                          
                                                            MC-006        -68,114                  05/05/23   12/27/23    C.B. STRAIN                         
                                                            MC-008          6,676                  03/23/23   12/19/23    C.B STRAIN                          
                                                            MC-009         11,588                  03/23/23   12/19/23    C.B STRAIN                          
                                                            MC-011          3,279                  03/23/23   12/19/23    C.B. STRAIN                         
                                                            PC-001         23,324                  11/12/20   02/16/21    S&O PLUMBING SERVICES, INC.         
                                                            PC-002         17,942                  03/15/21   05/13/21    S&O PLUMBING SERVICES, INC.         
                                                            PC-003         -4,448                  03/15/21   05/13/21    S&O PLUMBING SERVICES, INC.         
                                                            PC-004          7,102                  06/03/21   09/07/21    S7O PLUMBING                        
                                                            PC-005          4,005                  09/21/21   06/16/22    S&O Construction Services, Inc      
                                                            PC-006          6,144                  01/24/22   01/25/23    S&O Const Servs Inc                 
                                                            PC-007          2,653                  08/10/22   05/22/23    S&O Const Servs Inc                 
                                                            PC-009          6,508                  03/23/23   12/19/23    S&O CONSTRUCTION SERVICES           
                                                            S-009          -3,000                  03/14/22   02/22/23    Amity Const Corp                    
                                                            S-013           4,751                  05/20/22   05/01/23    Amity Const Corp                    
                                                            SITE-001       19,301                  09/28/20   11/27/20    CASA BUILDERS                       
                                                            SITE-002       13,220                  09/28/20   11/27/20    CASA BUILDERS                       
                                                            SITE-003       -5,185                  11/12/20   02/10/21    CASA BUILDERS                       
                                                            SITE-004        6,481                  01/12/21   06/15/21    CASA BUILDERS                       
                                                            SITE-005       12,088                  01/27/21   03/18/21    BASA BUILDERS                       
                                                            SITE-006     -240,000                  01/27/21   03/18/21    CASA BUILDERS                       
                                                            SITE-017       12,826                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-018        7,051                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-019       10,300                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-020        2,320                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-021        3,170                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-022        2,895                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-023        3,323                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-024        1,034                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-025        2,473                  11/14/22   12/07/23    AMITY CONSTRUCTION CORP             
                                                            SITE-026       74,879                  01/25/23   12/12/23    AMITY CONST CORP                    
                                                            SITE-027       28,421                  01/25/23   12/12/23    AMITY CONST CORP                    
                                                            SITE-028        1,241                  01/25/23   12/12/23    AMITY CONST CORP                    
                                                            SITE-029        4,090                  09/05/23   01/08/24    AMITY CONSTRUCTION CORP             
                                                            SITE-30         2,518                  09/05/23   01/08/24    AMITY CONSTRUCTION CORP             
                                                            SITE-31         1,705                  09/05/23   01/08/24    AMITY CONSTRUCTION CORP             
                                                            Site-001       25,000                  10/18/21   12/05/22    Amity Const Corp                    
                                                            Site-002      -15,000                  10/18/21   12/05/22    Amity Const Corp                    
                                                            Site-003      -22,250                  10/18/21   12/05/22    Amity Const Corp                    
                                                            Site-010      -12,000                  02/24/22   03/27/23    Amity Const Corp                    
                                                            Site-011        1,498                  02/24/22   03/27/23    Amity Const Corp                    
                                                            Site-012          480                  02/24/22   03/27/23    Amity Const Corp                    
                                                            Site-014       22,172                  08/10/22     /  /      Amity Const Corp                    
                                                            Site-015       10,813                  08/10/22   09/26/23    Amity Const Corp                    
                                                            Site-016      -85,000                  08/10/22   03/28/23    Amity Const Corp                    
 
19-1904   Reconstruction               0-003-028  08/18/20  NO CHANGE ORDERS ON ELECTRONIC FILE
22-0939   Reconstruction               0-003-030  04/11/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Bldg.:
01-0984   Reconstruction               1-002-005  10/02/02  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0791   Reconstruction               1-002-007  02/21/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1637   Reconstruction               1-002-008  08/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1285   Reconstruction               1-002-009  05/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1529   Reconstruction               1-002-010  11/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           5,142           5,142  09/13/04   10/26/04    Westbank Contracting                
 
12-1001   Reconstruction               1-002-012  04/18/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -2,061                  10/09/13   10/24/13    Sea Breeze General Construction, Inc
                                                            002            -5,500                  10/09/13   10/24/13    Sea Breeze General Construction, Inc
                                                            003            -5,000                  12/20/13   02/04/14    Sea Breeze General Construction, Inc
 
17-0026   Reconstruction               1-002-013  06/07/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1905   Reconstruction               1-002-014  08/18/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          Greenhouse:
19-1058   New Construction             7-047-001  04/28/20  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
13-1170   Reconstruction               7-999-001  04/14/14  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1138   Reconstruction               7-999-002  04/10/17  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0895   Reconstruction               7-999-004  03/14/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         13,497                  05/15/23   12/27/23    LEGACY SUPPLY                       
                                                            GC-02          -5,760                  05/15/23   12/27/23    LEGACY SUPPLY                       
 

          Education & Training Academy:
00-1530   Reconstruction               8-014-008  11/28/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-GC            4,402                  01/17/03   02/06/03    Profex                              
                                                            2-EC            8,831                  01/17/03   02/06/03    P&D Elec.                           
                                                            2-GC            1,404                  09/05/03   09/19/03    Profex                              
                                                            4-EC            2,687                  01/17/03   02/06/03    P&D Elec.