BERKSHIRE UFSD - DISTRICT CLOSED STATUS REPORT ON CAPITAL PROJECTS
District No.: 10-03-08-02
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXNew BerkshireHS-SpecAct-Closed2020:
90-1163   New Construction             0-001-001  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0614   Reconstruction               0-001-003  04/22/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1495   Reconstruction               0-001-005  03/14/06  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1106   Reconstruction               0-001-006  04/11/11  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0781SC Visual Structural Inspection 0-001-SC1  02/27/07  NO CHANGE ORDERS ON ELECTRONIC FILE

TACONIC HILLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 10-05-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Ockawamick School:
93-0256   Reconstruction               0-001-005  11/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0246   Reconstruction               0-001-009  10/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0935   Reconstruction               0-001-011  03/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0527   Reconstruction               0-001-012  12/18/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0076   Reconstruction               0-001-013  07/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1352   Reconstruction               0-001-015  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roeliff Jansen School:
90-1466   Reconstruction               0-004-003  06/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1018   Reconstruction               0-004-006  06/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0247   Reconstruction               0-004-007  10/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0729   Alterations                  0-004-008  01/31/00  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0061   Reconstruction               0-004-009  07/22/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0077   Reconstruction               0-004-011  07/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1353   Reconstruction               0-004-013  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          K-12 School:
97-0985   New Construction             0-017-001  03/26/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            10.7            2,111                  12/10/02   12/10/02    M&B Plumbing                        
                                                            35.12           9,337                  12/10/02   12/10/02    Campito Plumbing                    
                                                            35.27           6,363                  12/10/02   12/10/02    Colonie Masonry                     
                                                            35.28           6,859                  12/10/02   12/10/02    Schenectady Hardware & Elec.        
                                                            35.6              500                  12/10/02   12/10/02    Greenport Roofing                   
                                                            36.13          11,215                  12/11/02   12/11/02    Campito Plumbing                    
                                                            36.16           1,888                  12/11/02   12/11/02    M&B Plumbing                        
                                                            36.28           1,858                  12/10/02   12/10/02    Colonie Masonry                     
                                                            36.29          12,331                  12/11/02   12/11/02    Schen. Hardware                     
                                                            36.7            1,000                  12/10/02   12/10/02    Greenport Roofing                   
                                                            37.14           6,653                  12/10/02   12/10/02    Campito Plumbing                    
                                                            37.14             117                  12/11/02   12/11/02    Gen. Drywall Corp.                  
                                                            37.17             958                  12/10/02   12/10/02    M&B Plumbing                        
                                                            37.30           2,795                  12/10/02   12/10/02    Schen. Hardware                     
                                                            37.9            7,989                  12/10/02   12/10/02    Sigma Painting                      
                                                            37.9            1,178                  12/11/02   12/11/02    Northeast Interior                  
                                                            38.10           3,609                  12/11/02   12/11/02    Northeast Interior                  
                                                            38.29           3,237                  12/11/02   12/11/02    Colonie Masonry                     
                                                            38.31             318                  12/10/02   12/10/02    Schen. Hardware                     
                                                            38.8           30,766                  12/11/02   12/11/02    Greenport Roofing                   
                                                            39.2              283                  12/10/02   12/10/02    Buffalo Hotel Supply                
                                                            39.30          13,361                  12/10/02   12/10/02    Colonie Masonry                     
                                                            39.32           1,077                  12/10/02   12/10/02    Schen. Hardware                     
                                                            41.15         -19,857                  12/11/02   12/11/02    Campito Plumbing                    
                                                            41.31           3,164                  12/10/02   12/10/02    Colonie Masonry                     
                                                            42.15           4,135                  12/10/02   12/10/02    Schen. Steel                        
                                                            42.18           2,896                  12/10/02   12/10/02    M&B Plumbing                        
                                                            42.33           6,356                  12/10/02   12/10/02    Schen. Hardware                     
                                                            43.18             300                  12/10/02   12/10/02    Kingsley Arms                       
                                                            43.19           4,669                  12/10/02   12/10/02    M&B Plumbing                        
                                                            43.32           1,155                  12/10/02   12/10/02    Colonie Masonry                     
                                                            43.34           7,653                  12/10/02   12/10/02    Schen. Hardware                     
                                                            44.15          13,312                  12/10/02   12/10/02    Gen. Drywall Corp.                  
                                                            44.16            -282                  12/10/02   12/10/02    Schenectady Steel                   
                                                            44.20           7,395                  12/10/02   12/10/02    M&B Plumbing                        
                                                            44.33           6,343                  12/10/02   12/10/02    Colonie Masonry                     
                                                            44.35          12,514                  12/10/02   12/10/02    Schen. Hardware                     
                                                            45.11           2,579                  12/10/02   12/10/02    Northeast Interior                  
                                                            45.16          12,540                  12/10/02   12/10/02    Gen. Drywall Corp.                  
                                                            45.34           7,548                  12/10/02   12/10/02    Colonie Masonry                     
                                                            45.36           7,574                  12/10/02   12/10/02    Schen. Hardware                     
                                                            46.19            -323                  12/11/02   12/11/02    Kingsley Arms                       
                                                            47.17           4,661                  12/10/02   12/10/02    Schen. Steel                        
                                                            47.20          11,600                  12/10/02   12/10/02    Kingsley Arms                       
                                                            47.35           7,089                  12/10/02   12/10/02    Colonie Masonry                     
                                                            47.37           1,538                  12/10/02   12/10/02    Schen. Hardware                     
                                                            48.10             200                  12/11/02   12/11/02    Sigma Painting                      
                                                            48.12           4,113                  12/11/02   12/11/02    Northeast Interior                  
                                                            48.2              150                  12/11/02   12/11/02    Carpetmaster of Latham              
                                                            48.36           4,552                  12/11/02   12/11/02    Colonie Masonry                     
                                                            48.5            1,761                  12/11/02   12/11/02    Johnson Howard                      
                                                            49.17           4,173                  12/11/02   12/11/02    Campito Plumbing                    
                                                            49.21           1,787                  12/11/02   12/11/02    M&B Plumbing                        
                                                            49.38          -3,168                  12/11/02   12/11/02    Schen. Hardware                     
                                                            50.10          10,616                  12/11/02   12/11/02    Greenport Roofing                   
                                                            50.12           3,305                  12/11/02   12/11/02    Sigma Painting                      
                                                            50.37          14,423                  12/11/02   12/11/02    Colonie Masonry                     
                                                            50.39           9,021                  12/11/02   12/11/02    Schen. Hardware                     
                                                            52.21          -2,600                  12/11/02   12/11/02    Kingsley Arms                       
                                                            53.39           9,119                  12/11/02   12/11/02    Colonie Masonry                     
                                                            53.6            1,043                  12/11/02   12/11/02    Johnson Howard Assoc.               
                                                            54.18          11,769                  12/11/02   12/11/02    Campito Plumbing                    
                                                            54.22           4,516                  12/11/02   12/11/02    M&B Plumbing                        
                                                            54.40           6,584                  12/11/02   12/11/02    Schen. Hardware                     
                                                            55.22           4,992                  12/11/02   12/11/02    Kingsley Arms                       
                                                            56.13           1,817                  12/11/02   12/11/02    Northeaast Interior                 
                                                            57.40          -8,592                  12/11/02   12/11/02    Colonie Masonry                     
                                                            59.41           7,839                  12/11/02   12/11/02    Schen. Hardware                     
 
98-1632   Additions and Alterations    0-017-003  07/01/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2.1           -20,000                  12/11/02   12/11/02    Mazone Plumbing                     
                                                            2.1              -900                  12/11/02   12/11/02    Mazone Plumbing                     
                                                            2.2            10,421                  12/10/02   12/10/02    Colonie Masonry                     
                                                            3.2               398                  12/11/02   12/11/02    Mazone Plumbing                     
                                                            3.3             5,127                  12/11/02   12/11/02    Colonie Masonry                     
                                                            36.28             573                  12/10/02   12/10/02    Colonie Masonry                     
                                                            4.1               812                  12/11/02   12/11/02    Schen. Hardware                     
                                                            4.1             4,728                  12/11/02   12/11/02    Stone Bridge Iron & Steel           
                                                            4.2              -400                  12/11/02   12/11/02    Mazone Plumbing                     
                                                            41.15          29,194                  12/11/02   12/11/02    Campito Plumbing                    
                                                            43.34             406                  12/10/02   12/10/02    Schen. Hardware                     
                                                            44.16           5,856                  12/10/02   12/10/02    Campito Plumbing                    
                                                            44.20             670                  12/10/02   12/10/02    M&B Plumbing                        
                                                            5.3               415                  12/11/02   12/11/02    Mazone Plumbing                     
                                                            5.5             1,783                  12/11/02   12/11/02    Colonie Masonry                     
                                                            51.38          11,486                  12/11/02   12/11/02    Colonie Masonry                     
                                                            57.3            3,460                  12/11/02   12/11/02    Carpetmaster of Latham              
                                                            6.2             4,050                  12/11/02   12/11/02    Schen. Hardware                     
                                                            6.3             1,081                  12/11/02   12/11/02    Mazone Plumbing                     
                                                            6.6               960                  12/11/02   12/11/02    Colonie Masonry                     
                                                            7.3             1,953                  12/11/02   12/11/02    Schen. Hardware                     
                                                            7.4             1,517                  12/11/02   12/11/02    Mazone Plumbing                     
 
06-0226   Reconstruction               0-017-004  01/03/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            001             6,282                  02/25/08   08/05/08    merit plumbing&heating              
                                                            E-1            18,974                  12/03/07   01/28/08    Pantel Contracting Corp             
                                                            E-2             9,409                  12/03/07   01/28/08    Pantel Contracting Corp             
 
09-0587   Reconstruction               0-017-006  02/10/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          76,800                  07/23/10   08/23/10    MID-STATE INDUSTRIES LTD            
                                                            GC-02          26,200                  07/23/10   08/23/10    MID-STATE INDUSTRIES LTD            
                                                            GC-03           3,345                  11/04/10   11/16/10    MID STATE INDUSTRIES, LTD.          
 
09-1157   Reconstruction               0-017-007  08/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0362   Reconstruction               0-017-008  12/07/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         22,261                  09/12/11   10/14/11    HAROLD R CLUNE INC                  
                                                            EC-002         16,643                  01/23/12   04/13/12    HAROLD R CLUNE INC                  
                                                            EC-003          8,520                  01/25/12   04/27/12    HAROLD R CLUNE INC                  
                                                            EC-004         15,148                  01/25/12   04/27/12    HAROLD R CLUNE INC                  
                                                            GC-001        -19,425                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-002         26,627                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-003        -29,370                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-004          6,244                  09/12/11   12/02/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-005         15,114                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-006          5,058                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-007        -27,002                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-008         22,660                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-009         29,175                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-010         33,990                  09/12/11   12/01/11    SHAKER FLATS LANDSCAPING INC        
                                                            GC-011          4,877                  01/23/12   04/13/12    SHAKER FLATS LANDSCAPING INC        
                                                            GC-012         18,632                  01/23/12   04/13/12    SHAKER FLATS LANDSCAPING INC        
                                                            GC-013         12,300                  01/23/12   04/13/12    SHAKER FLATS LANDSCAPING INC        
                                                            GC-014         16,242                  01/23/12   04/13/12    SHAKER FLATS LANDSCAPING INC        
                                                            GC-015         17,405                  01/23/12   04/13/12    SHAKER FLATS LANDSCAPING INC        
                                                            GC-016          8,831                  03/13/12   08/02/12    SHAKER FLATS LANDSCAPING INC        
                                                            GC-017        -62,412                  08/01/12   11/09/12    Shaker Flats Landscaping, Inc.      
                                                            GC-018       -231,761                  08/21/12   12/21/12    SHAKER FLATS LANDSCAPING INC        
                                                            GC-019          7,315                  10/04/12   02/15/13    SHAKER FLATS LANDSCAPING INC        
 
10-0548   Reconstruction               0-017-010  06/10/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           4,799                  03/11/13   10/11/13    J. MCBAIN INC                       
                                                            GC 2-05       -17,836                  04/10/12   10/19/12    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC 2-06        -6,096                  04/10/12   10/19/12    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC 2-07       -40,213                  06/19/12   11/09/12    Hoosick Valley Contractors, Inc.    
                                                            GC 2-08         3,290                  07/19/12   01/25/13    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC 2-09       -11,102                  09/13/12   01/25/13    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC 2-10        -1,000                  10/15/12   02/22/13    Hoosick Valley Contractors, Inc.    
                                                            HVAC-01       -12,610                  10/23/12   08/12/13    Crisafulli Bros. Plumbing and Heatin
                                                            HVAC-02           801                  08/26/13   08/29/13    Crisafulli Bros. Plumbing & Heating 
                                                            PC - 001        5,000                  10/15/12   07/15/13    Crisafulli Bros. Plumbing and Heatin
 
13-1342   Reconstruction               0-017-011  11/05/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1287   Reconstruction               0-017-012  04/11/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         27,629                  09/11/14   09/24/14    Bast Hatfield Constructuction, LLC  
                                                            GC-002         10,398                  11/03/14   11/24/14    Bast Hatfield Construction, Inc.    
 
14-0471   Reconstruction               0-017-013  07/22/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001        117,951                  02/18/16   02/29/16    Gallo Construction Corp.            
                                                            GC-002         17,196                  04/14/16   05/06/16    GALLO CONSTRUCTION CORP.            
                                                            GC-003          4,779                  01/18/17   01/27/17    Gallo Construction Corp.            
 
13-1587   Reconstruction               0-017-014  07/15/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001         -1,774                  01/15/15   07/30/15    Duncan & Cahill, Inc.               
 
15-1255   Reconstruction               0-017-015  06/15/16  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1094   Reconstruction               0-017-016  12/12/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1016   Reconstruction               0-017-017  03/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          3,678                  09/29/20   11/05/20    J. MCBAIN, INC.                     
                                                            EC-002          4,150                  11/27/20   02/01/21    J. MCBAIN, INC.                     
                                                            EC-01          -2,124                  02/18/21   04/09/21    J. MCBAIN, INC.                     
                                                            GC-001        626,000                  02/06/20   03/16/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-001          4,236                  03/09/20   06/30/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-001        163,000                  06/10/21   11/09/21    Hoosick Valley Contractors          
                                                            GC-002         11,034                  03/09/20   06/30/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-002          6,983                  06/17/20   07/23/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-002         21,471                  06/10/21   11/09/21    Hoosic Valley Contractors           
                                                            GC-003          9,663                  06/17/20   07/23/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-003         25,433                  06/10/21   11/09/21    Hoosic Valley Contractors           
                                                            GC-004          9,663                  06/17/20   07/23/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-004         -7,809                  08/24/21   05/06/22    HOOSICK VALLEY CONTRACTORS, INC     
                                                            GC-005          9,663                  06/17/20   07/23/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-005         -5,000                  10/14/21   12/02/22    Hoosick Valley Contractors, Inc     
                                                            GC-006          5,905                  06/17/20   07/23/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-007         13,911                  06/17/20   07/23/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-008         16,674                  06/17/20   07/23/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-009         11,060                  07/17/20   09/10/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-010         10,271                  08/07/20   09/17/20    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-011          3,059                  11/06/20   03/08/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            GC-012          9,762                  11/27/20   05/07/21    HOOSICK VALLEY CONTRACTORS, INC.    
                                                            MC-001           -148                  02/05/20   03/05/20    T. LEMME MECHANICAL                 
                                                            MC-002          4,817                  08/07/20   10/06/20    T. LEMME MECHANICAL                 
                                                            MC-003          5,000                  12/02/20   02/01/21    T. LEMME MECHANICAL                 
                                                            MC-005          1,845                  12/02/20   02/01/21    T. LEMME MECHANICAL                 
                                                            MC-006        179,000                  11/27/20   01/29/21    T. LEMME MECHANICAL                 
                                                            MC-007           -900                  02/18/21   04/09/21    T. LEMME MECHANICAL                 
                                                            PC-001         10,492                  09/25/19   10/01/19    ASHLEY MECHANICAL, INC.             
                                                            PC-002            806                  03/09/20   06/29/20    ASHLEY MECHANICAL, INC.             
                                                            PC-003          8,230                  06/17/20   07/15/20    ASHLEY MECHANICAL, INC.             
                                                            PC-004            866                  06/17/20   07/15/20    ASHLEY MECHANICAL, INC.             
                                                            PC-005          6,119                  06/17/20   07/15/20    ASHLEY MECHANICAL, INC.             
                                                            PC-006         16,649                  09/22/20   11/06/20    ASHLEY MECHANICAL, INC.             
                                                            PC-007          5,012                  09/22/20   11/06/20    ASHLEY MECHANICAL, INC.             
                                                            SC-002          4,440                  10/15/19   10/28/19    DELSIGNORE BLACKTOP PAVING INC.     
                                                            SC-003         14,000                  06/17/20   07/24/20    DELSIGNORE BLACKTOP PAVING, INC.    
 
22-0759   Reconstruction               0-017-018  03/30/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular - Okawamick:
95-1654   New Construction             0-020-001  06/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular - Roeliff Jansen:
95-1655   New Construction             0-021-001  06/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular 2-Roeliff:
96-0425   New Construction             0-022-001  06/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Garage-Ockwamick:
96-0023   New Construction             2-019-001  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building #3:
14-0675   Reconstruction               2-034-002  10/26/15  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roe Jan Bus Garage:
97-1354   Reconstruction               5-002-003  05/04/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          eew Bus Garage:
97-1184   New Construction             5-023-001  03/26/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            35.28           4,928                  12/10/02   12/10/02    Schenectady Hardware & Elec.        
                                                            37.14           1,522                  12/11/02   12/11/02    Gen. Drywall Corp.                  
                                                            43.18          -1,262                  12/10/02   12/10/02    Kingsley Arms                       
                                                            43.34           4,445                  12/10/02   12/10/02    Schen. Hardware                     
                                                            44.20             436                  12/10/02   12/10/02    M&B Plumbing                        
                                                            44.35           1,518                  12/10/02   12/10/02    Schen. Hardware                     
                                                            45.36             204                  12/10/02   12/10/02    Schen. Hardware                     
                                                            46.19           8,000                  12/11/02   12/11/02    Kingsley Arms                       
                                                            49.11           1,767                  12/11/02   12/11/02    Sigma Painting                      
 
09-1158   Reconstruction               5-023-002  08/18/10  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0550   Reconstruction               5-023-003  06/10/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC 2-01        15,417                  03/13/12   10/25/12    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC 2-02        21,265                  03/13/12   10/25/12    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC 2-03        17,438                  03/13/12   10/25/12    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC 2-04        32,155                  03/13/12   10/25/12    HOOSICK VALLEY CONTRACTORS INC      
 
13-1343   Reconstruction               5-023-005  11/05/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0472   Reconstruction               5-023-006  07/24/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-001        -33,720                  12/11/15   01/06/16    Merit Plumbing & Heating, LLC       
                                                            MC-002         -4,787                  03/16/17   04/13/17    Merit Plumbing & Heating, LLC       
 
13-1288   Reconstruction               5-023-007  04/11/14  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0630   Reconstruction               5-023-008  11/29/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-1017   Reconstruction               5-023-009  03/04/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-004            450                  12/02/20   02/01/21    T. LEMME MECHANICAL                 
                                                            SC-001         30,770                  10/15/19   10/28/19    DELSIGNORE BLACKTOP PAVING INC.     
 
22-2385   Reconstruction               5-023-010  08/03/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box:
97-1185   New Construction             7-024-001  03/26/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            17.14         100,094                  12/11/02   12/11/02    Schen. Hardware                     
                                                            25.4              573                  12/11/02   12/11/02    Greenport Roofing                   
 

          Storage Bldg.A:
97-1186   New Construction             7-025-001  03/26/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            17.9            2,822                  12/11/02   12/11/02    Kingsley Arms                       
 

          Storage Bldg. #2:
97-1187   New Construction             7-026-001  03/26/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Toilet Facility (Main Event Fiel:
10-0551   New Construction             7-032-001  06/10/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Toilet Facilty (West Fields):
10-0552   New Construction             7-033-001  06/10/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
16-1491   Reconstruction               7-999-001  07/20/17  NO CHANGE ORDERS ON ELECTRONIC FILE

          MANUF. CR BLDG.2 OCKAWAMIC:
91-0178   New Construction             8-015-001  09/09/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Leased Modular-Ockawamick:
94-1637   New Construction             8-018-001  08/08/95  NO CHANGE ORDERS ON ELECTRONIC FILE

GERMANTOWN CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 10-09-02-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
92-1163   Reconstruction               0-001-004  05/13/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0148   Reconstruction               0-001-005  08/18/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0019   Reconstruction               0-001-007  07/15/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0046   Additions and Alterations    0-001-008  08/18/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1103   Additions and Alterations    0-001-009  03/22/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1563   Additions and Alterations    0-001-014  08/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            22-11           2,621                  07/12/04   07/13/04    DiGesare Mech.                      
                                                            23-6              528                  07/12/04   07/13/04    Quality Painters                    
 
03-1285   Reconstruction               0-001-015  05/19/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           1,400                  01/12/05   02/07/05    Linda Holding Corp                  
                                                            00001            -700                  01/12/05   02/07/05    New Britain Roofing Co              
                                                            00002          35,200                  01/12/05   02/11/05    Linda Holding Corp                  
                                                            00002           9,956                  01/12/05   02/07/05    New Britain Roofing Co              
                                                            00003           1,499                  01/12/05   02/07/05    Linda Holding Corp                  
                                                            00003           6,000                  01/12/05   02/07/05    New Britain Roofing Co              
                                                            00004          14,175                  01/12/05   02/07/05    Linda Holding Corp                  
                                                            00004            -315                  01/12/05   02/07/05    New Britain Roofing Co              
                                                            00005           6,114                  01/12/05   02/07/05    Linda Holding Corp                  
                                                            00006           1,980                  01/12/05   02/07/05    Linda Holding Corp                  
 
05-0714   Reconstruction               0-001-016  03/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1274   Reconstruction               0-001-017  02/20/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01           11,680                  05/08/09   07/31/09    TECH ELECTRIC INC                   
                                                            GC-01          19,720                  12/15/08     /  /      MEYER CONTRACTING CORPORATION       
                                                            GC-02          14,480                  12/15/08     /  /      MEYER CONTRACTING CORPORATION       
                                                            GC-03           4,432                  12/15/08   07/06/09    MEYER CONTRACTING CORPORATION       
                                                            GC-04           1,683                  12/15/08   07/06/09    MEYER CONTRACTING CORPORATION       
                                                            GC-05           2,833                  12/15/08   07/08/09    MEYER CONTRACTING CORPORATION       
 
14-0056   Reconstruction               0-001-020  02/10/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           1,008                  03/28/16   04/01/16    Wainschaf Associates, Inc.          
                                                            GC-02           1,644                  03/28/16   04/01/16    Wainschaf Associates, Inc.          
 
16-2106   Additions and Alterations    0-001-021  07/11/18  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001       -138,500                  09/16/20   11/12/20    DLC ELECTRIC, LLC                   
                                                            EC-002          4,516                  09/16/20   11/12/20    DLC ELECTRIC, LLC                   
                                                            EC-003         10,408                  09/16/20   11/12/20    DLC ELECTRIC, LLC                   
                                                            EC-004         12,918                  09/16/20   11/12/20    DLC ELECTRIC, LLC                   
                                                            EC-005         18,465                  10/21/20   12/29/20    DLC ELECTRIC, LLC                   
                                                            EC-006         -1,883                  01/25/21   04/05/21    DLC ELECTRIC, LLC                   
                                                            GC-001       -308,937                  09/16/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-002         19,747                  09/16/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-003          5,224                  09/16/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-004         15,002                  09/16/20   11/13/20    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-005       -172,982                  12/31/20   05/14/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-006         11,767                  01/25/21   04/05/21    BAST HATFIELD CONSTRUCTION, LLC     
                                                            HC-001        -35,000                  09/16/20   11/12/20    E.W. TOMPKINS CO.,INC.              
                                                            HC-002        -21,500                  09/16/20   11/12/20    E.W. TOMPKINS CO.,INC.              
                                                            HC-003         19,305                  09/16/20   11/12/20    E.W. TOMPKINS CO.,INC.              
                                                            HC-004          8,861                  09/16/20   11/12/20    E.W. TOMPKINS CO.,INC.              
                                                            HC-005         29,000                  10/05/20   12/02/20    E.W. TOMPKINS CO.,INC.              
                                                            PC-001          8,588                  09/16/20   11/12/20    CONDOR FIRE SPRINKLER CO., LLC      
                                                            PC-002          2,241                  09/16/20   11/12/20    CONDOR FIRE SPRINKLER CO.,LLC       
                                                            PC-003        150,632                  09/16/20   11/10/20    CONDOR FIRE SPRINKLER CO., LLC      
                                                            PC-004         -1,892                  01/25/21   04/05/21    CONDOR FIRE SPRINKLER CO., LLC      
                                                            SC-001        -49,533                  09/16/20   11/13/20    DELSIGNORE BLACKTOP PAVING, INC.    
                                                            SC-002         14,913                  09/16/20   11/13/20    DELSIGNORE BLACKTOP PAVING, INC.    
                                                            SC-003          3,679                  09/16/20   11/13/20    DELSIGNORE BLACKTOP PAVING, INC.    
                                                            SC-004         -7,097                  12/16/20   04/06/21    DELSIGNORE BLACKTOP PAVING, INC.    
 
16-1156   Reconstruction               0-001-023  12/04/17  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1792   Reconstruction               0-001-024  06/27/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0294   Reconstruction               0-001-026  11/08/18  NO CHANGE ORDERS ON ELECTRONIC FILE
19-0016   Reconstruction               0-001-027  08/02/19  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0211   Reconstruction               0-001-029  10/23/23  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0617   Reconstruction               0-001-FP1  11/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0081SC Visual Structural Inspection 0-001-SC1  07/23/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular:
98-1564   New Construction             0-004-001  08/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Leased Modular B-Relocation:
98-1565   New Construction             0-005-001  08/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Garage:
17-1087   Reconstruction               4-002-001  10/17/18  NO CHANGE ORDERS ON ELECTRONIC FILE

          Greenhouse:
14-1694   New Construction             7-006-001  07/01/15  NO CHANGE ORDERS ON ELECTRONIC FILE

CHATHAM CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 10-10-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Middle School:
90-1018   Reconstruction               0-002-007  03/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1706   Reconstruction               0-002-008  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1631   Reconstruction               0-002-009  06/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0590   Reconstruction               0-002-010  12/26/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0487   Reconstruction               0-002-011  04/07/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -7,725                  11/30/01   01/10/02    Quaker Bay                          
                                                            1            -121,496                  02/07/02   04/17/03    Adams Plumbing                      
                                                            1             -84,350                  02/27/02   04/17/03    Gross Elec.                         
                                                            1              -5,441                  08/05/02   08/16/02    Hudson Valley Communcations         
                                                            1             -16,742                  08/05/02   08/16/02    Henderson-Johnson                   
                                                            1             -20,413                  10/15/02   02/13/03    Scholastic Furniture                
                                                            10              8,082                  04/22/03   04/22/03    Bunkoff Const.                      
                                                            11             15,506                  11/30/01   01/10/02    Bunkoff Const.                      
                                                            12             31,234                  11/30/01   01/10/02    Bunkoff Const.                      
                                                            13               -954                  08/05/02   08/16/02    Bunkoff Const.                      
                                                            2             -25,000                  02/27/02   04/19/02    Open Systems Technology             
                                                            2                -215                  08/05/02   08/16/02    Hudson Valley Communications        
                                                            2             -30,708                  08/05/02   08/16/02    Adams Plumbing                      
                                                            2             -12,385                  05/05/03   05/21/03    Scholastic Furniture                
                                                            3             -31,560                  08/05/02   08/16/02    Hudson Valley Communications        
                                                            4              27,802                  08/05/02   08/16/02    Gross Elec.                         
                                                            5              13,859                  08/05/02   08/16/02    Gross Elec.                         
                                                            5                -603                  08/05/02   08/16/02    DiGesare Mech.                      
                                                            5              12,197                  04/22/03   04/24/03    Bunkoff Const.                      
                                                            6               3,793                  05/07/01   01/08/02    Bunkoff Const.                      
                                                            6             -79,198                  04/29/04   05/12/04    Gross Elec.                         
 
98-1448   Reconstruction               0-002-012  08/10/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1186   Reconstruction               0-002-013  06/29/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            -4,000                  02/09/06   05/23/06    Gross Electric                      
                                                            E-2             8,622                  12/27/06   01/19/07    Gross Electric                      
                                                            E-3            -5,000                  04/16/07   05/15/07    Gross Electric                      
                                                            GC-1          -28,000                  02/09/06   05/05/06    Ferrari and Sons                    
                                                            GC-2            3,248                  05/31/06   08/25/06    Ferrari and Sons                    
                                                            GC-3           -3,900                  07/24/06   08/21/06    Ferrari and Sons Inc                
                                                            GC-4            3,857                  09/01/06   10/13/06    Ferrari and Sons                    
                                                            GC-5           -1,730                  09/01/06   10/13/06    Ferrari and Sons                    
                                                            GC-6            7,786                  09/01/06   10/13/06    Ferrari and Sons                    
                                                            GC-7            2,065                  11/03/06   12/28/06    Ferrari and Sons                    
                                                            GC-8           37,076                  11/03/06   12/28/06    Ferrari and Sons                    
                                                            GC-9            4,343                  12/27/06   01/23/07    Ferrari Sons                        
 
08-0680   Additions and Alterations    0-002-014  04/02/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-06          90,581                  09/29/09   04/30/10    FERRARI & SONS INC                  
                                                            01-08           4,892                  12/16/09   02/16/10    FERRARI & SONS INC                  
                                                            01-12          22,148                  02/18/10   03/31/10    FERRARI & SONS INC                  
                                                            02-04         -16,061                  12/16/09   02/16/10    JAMES A. EDGAR COMPANY INC          
                                                            02-06           2,626                  02/18/10   03/31/10    JAMES A. EDGAR COMPANY INC          
 
10-0220   Reconstruction               0-002-015  01/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00008           2,385                  12/08/11   07/16/12    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00032           9,755                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00036           8,998                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00044           1,302                  12/08/11   07/24/12    BETTE & CRING                       
 
09-0987   Reconstruction               0-002-016  04/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002               0                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            00005           1,060                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            00006             475                  01/05/11   02/18/11    ROSCH BROTHERS INC                  
                                                            00008             499                  01/05/11   02/18/11    ROSCH BROTHERS INC                  
                                                            00009             765                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
 
12-1336   Reconstruction               0-002-017  06/28/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001          -5,000                  08/06/14   08/27/14    Shaker Flats Landscaping            
 
17-2061   Reconstruction               0-002-019  07/26/18  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0828   Reconstruction               0-002-020  01/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          9,739                  06/29/20   08/04/20    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-008         20,665                  12/04/20   02/03/21    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-009           -654                  12/11/20   02/25/21    KASSELMAN ELECTRIC CO.,INC.         
                                                            GC-002         10,610                  01/03/20   02/03/20    WAINSCHAF ASSOCIATES, INC.          
                                                            GC-003         54,356                  02/13/20   06/02/20    WAINSCHAF ASSOCIATES, INC.          
                                                            GC-004         11,423                  03/13/20   07/15/20    WAINSCHAF ASSOCIATES, INC.          
                                                            GC-008         27,804                  11/05/20   03/08/21    WAINSCHAF ASSOCIATES, INC.          
                                                            GC-009         14,568                  11/05/20   03/08/21    WAINSCHAF ASSOCIATES, INC.          
                                                            GC-012           -192                  11/27/20   02/19/21    WAINSCHAF ASSOCIATES, INC.          
                                                            MC-004          4,019                  09/29/20   11/05/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            PC-001         -3,700                  12/11/20   02/25/21    CRISAFULLI BROS. PLUMBING & HEATING 
 
02-1203FP Reconstruction               0-002-FP1  02/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Mary Dardess Elementary:
90-1019   Reconstruction               0-003-007  03/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1707   Reconstruction               0-003-008  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1390   Reconstruction               0-003-009  06/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1633   Reconstruction               0-003-010  06/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0591   Reconstruction               0-003-011  12/26/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0488   Reconstruction               0-003-012  04/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1162   Reconstruction               0-003-013  04/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0681   Additions and Alterations    0-003-016  04/02/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-04          37,476                  09/29/09   11/13/09    FERRARI & SONS INC                  
                                                            01-09           4,398                  12/16/09   02/17/10    Ferrari & Son, INC                  
                                                            01-10          12,992                  12/16/09   02/16/10    FERRARI & SONS INC                  
                                                            01-13            -775                  08/30/10   09/28/10    FERRARI & SONS INC                  
                                                            02-01          17,172                  09/29/09   11/13/09    JAMES A. EDGAR COMPANY INC          
                                                            02-02          10,047                  09/29/09   11/13/09    JAMES A. EDGAR COMPANY INC          
                                                            02-03           2,999                  12/16/09   02/16/10    JAMES A. EDGAR COMPANY INC          
                                                            02-05          -2,529                  02/18/10   03/31/10    JAMES A. EDGAR COMPANY INC          
                                                            03-01               0                  12/16/09   02/16/10    COLLETT MECHANICAL INC              
                                                            03-03          -6,368                  08/30/10   09/28/10    COLLETT MECHANICAL INC              
                                                            04-01               0                  09/29/09   11/13/09    BROWNELL ELECTRIC CORP              
                                                            04-03               0                  12/16/09   02/16/10    BROWNELL ELECTRIC CORP              
                                                            04-05           2,408                  12/16/09   02/16/10    BROWNELL ELECTRIC CORP              
                                                            04-07           4,654                  02/18/10   03/31/10    BROWNELL ELECTRIC CORP              
                                                            04-08           2,346                  03/04/10   04/28/10    BROWNELL ELECTRIC CORP              
                                                            04-09            -165                  07/22/10     /  /      BROWNELL ELECTRIC CORP              
 
10-0221   Reconstruction               0-003-017  01/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  06/02/11   06/10/11    FAMILY DANZ HEATING & A/C           
                                                            00001               0                  06/02/11   06/10/11    J. MCBAIN INC                       
                                                            00001               0                  04/25/12   08/28/12    BETTE & CRING                       
                                                            00001               0                  04/25/12   09/07/12    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00002          35,000                  06/02/11   06/10/11    BETTE & CRING                       
                                                            00002           3,303                  07/12/11   08/16/11    J. MCBAIN INC                       
                                                            00002             634                  04/25/12   09/07/12    FAMILY DANZ HEATING & A/C           
                                                            00003           4,604                  06/02/11   06/10/11    BETTE & CRING                       
                                                            00003           1,381                  08/09/11   08/18/11    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00003             129                  08/15/11   12/29/11    FAMILY DANZ HEATING & A/C           
                                                            00004             180                  08/22/11   12/29/11    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00004             761                  08/22/11   12/29/11    FAMILY DANZ HEATING & A/C           
                                                            00005           2,094                  07/12/11   09/09/11    BETTE & CRING                       
                                                            00005           1,507                  08/22/11   12/29/11    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00005           2,303                  12/08/11   07/16/12    FAMILY DANZ HEATING & A/C INC       
                                                            00006           2,682                  08/09/11   12/29/11    J MCBAIN INC                        
                                                            00006           3,091                  09/19/11   12/22/11    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00007             578                  07/12/11   08/16/11    BETTE & CRING                       
                                                            00008             974                  08/09/11   09/08/11    BETTE & CRING                       
                                                            00008             605                  08/09/11   12/29/11    J MCBAIN INC                        
                                                            00009           1,913                  08/09/11   12/29/11    J MCBAIN INC                        
                                                            00011             404                  08/15/11   12/29/11    BETTE & CRING                       
                                                            00011           1,587                  08/22/11   12/29/11    J. MCBAIN INC                       
                                                            00012           2,957                  08/15/11     /  /      BETTE & CRING                       
                                                            00013           3,804                  08/15/11   08/26/11    BETTE & CRING                       
                                                            00014             517                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00014             454                  10/07/11   12/22/11    J. MCBAIN INC                       
                                                            00015           3,672                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00015          12,748                  10/07/11   12/22/11    J. MCBAIN INC                       
                                                            00016          -2,159                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00017           7,372                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00017           2,370                  10/07/11   11/23/11    J. MCBAIN INC                       
                                                            00018           2,875                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00019           1,546                  12/08/11   07/16/12    J. MCBAIN INC                       
                                                            00020             301                  09/19/11     /  /      BETTE & CRING                       
                                                            00020             191                  12/08/11   07/16/12    J. MCBAIN INC                       
                                                            00021           1,587                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00021           1,632                  12/08/11   07/16/12    J. MCBAIN INC                       
                                                            00022          19,679                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00022           3,116                  12/08/11   07/16/12    J. MCBAIN INC                       
                                                            00023             112                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00023            -230                  12/08/11   07/16/12    J. MCBAIN INC                       
                                                            00024           1,754                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00024            -224                  12/08/11   07/16/12    J. MCBAIN INC                       
                                                            00025           1,753                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00025           1,232                  03/16/12   08/06/12    J. MCBAIN INC                       
                                                            00026           4,777                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00027             409                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00028           4,410                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00028           4,410                  04/25/12   08/28/12    BETTE & CRING                       
                                                            00029          -4,299                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00030          -1,777                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00034          -9,758                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00035           2,741                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00037           3,685                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00039           3,759                  12/08/11   07/25/12    BETTE & CRING                       
                                                            00042           2,188                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00043           1,499                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00045           3,758                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00047           2,945                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00048             622                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00049           1,130                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00050           7,378                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00051           4,931                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00052           6,932                  12/08/11   07/23/12    BETTE & CRING                       
                                                            00053           2,758                  02/17/12   06/22/12    BETTE & CRING                       
                                                            00054           1,800                  02/17/12   06/22/12    BETTE & CRING                       
                                                            00055           1,034                  02/17/12   06/22/12    BETTE & CRING                       
                                                            00056             209                  02/17/12   06/22/12    BETTE & CRING                       
                                                            00057           1,756                  02/27/12   07/24/12    BETTE & CRING                       
 
09-0988   Reconstruction               0-003-018  04/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002          -1,200                  01/05/11   02/22/11    ROSCH BROTHERS INC                  
                                                            00002             695                  01/05/11   02/18/11    CARSOUSEL INDUSTRIES                
                                                            00003          15,845                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            00003               0                  01/05/11   02/18/11    ROSCH BROTHERS INC                  
                                                            00004             787                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            00004             958                  01/05/11   02/18/11    ROSCH BROTHERS INC                  
                                                            00005             668                  01/05/11   02/18/11    ROSCH BROTHERS INC                  
                                                            00007         -10,000                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            00007           2,031                  01/05/11   02/18/11    ROSCH BROTHERS INC                  
                                                            00008             765                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
 
10-0129   Reconstruction               0-003-019  08/31/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001               0                  03/10/11   03/28/11    ETM SOLAR WORKS                     
                                                            00002          27,000          27,000  08/09/11   Disapproved ETM SOLAR WORKS                     
 
14-1584   Reconstruction               0-003-021  06/23/15  NO CHANGE ORDERS ON ELECTRONIC FILE
17-0077   Reconstruction               0-003-022  09/21/17  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0829   Reconstruction               0-003-023  01/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-005          1,325                  12/04/20   02/03/21    KASSELMAN ELECTRIC CO.,INC.         
                                                            GC-010          7,361                  11/27/20   02/19/21    WAINSCHAF ASSOCIATES, INC.          
                                                            SC-001          5,073                  06/29/20   08/04/20    JAMES H. MALOY, INC.                
 
19-1375   Reconstruction               0-003-024  08/27/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0810   Reconstruction               0-003-025  08/11/20  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1201FP Reconstruction               0-003-FP1  02/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
92-0902   Reconstruction               0-005-002  04/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1708   Reconstruction               0-005-003  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1632   Reconstruction               0-005-004  06/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0592   Reconstruction               0-005-006  12/26/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1449   Reconstruction               0-005-008  08/10/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,046                  04/08/04   04/27/04    ESCO, Inc.                          
                                                            2              -1,858                  12/21/00   12/01/03    TP Monahan                          
 
98-0725   Reconstruction               0-005-009  04/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0801   Reconstruction               0-005-010  05/01/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           2,508                  11/03/06   12/27/06    Plank                               
                                                            GC-02          -4,206                  02/20/07   03/14/07    Plank                               
 
08-0682   Additions and Alterations    0-005-011  04/02/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01           6,431                  09/29/09   11/16/09    FERRARI & SONS INC                  
                                                            01-02          90,884                  09/29/09   04/30/10    FERRARI & SONS INC                  
                                                            01-03          40,262                  09/29/09   11/16/09    FERRARI & SONS INC                  
                                                            01-05          36,004                  09/29/09   05/14/10    FERRARI & SONS INC                  
                                                            01-07          16,881                  12/16/09   02/16/10    FERRARI & SONS INC                  
                                                            01-11          11,591                  02/18/10   03/31/10    FERRARI & SON INC                   
                                                            03-02               0                  12/16/09   02/16/10    COLLETT MECHANICAL INC              
                                                            04-02               0                  09/29/09   11/13/09    BROWNELL ELECTRIC CORP              
                                                            04-04          12,385                  12/16/09   02/16/10    BROWNELL ELECTRIC CORP              
                                                            04-06           5,690                  02/18/10   03/31/10    BROWNELL ELECTRIC CORP              
 
10-0222   Reconstruction               0-005-012  01/20/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           1,563                  08/09/11   08/18/11    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00003           1,320                  07/12/11   08/16/11    J. MCBAIN INC                       
                                                            00004          12,619                  07/12/11   09/09/11    BETTE & CRING                       
                                                            00004          -9,542                  10/07/11   12/22/11    J. MCBAIN INC                       
                                                            00005           1,242                  08/09/11   09/08/11    J MCBAIN INC                        
                                                            00006           1,723                  07/12/11   09/09/11    BETTE & CRING                       
                                                            00007           1,896                  08/09/11   09/08/11    J MCBAIN INC                        
                                                            00007           2,227                  12/08/11   09/07/12    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00009           1,285                  08/09/11   09/08/11    BETTE & CIRNG                       
                                                            00010           4,305                  08/09/11   09/08/11    BETTE & CRING                       
                                                            00010          13,769                  08/15/11   12/29/11    J MCBAIN INC                        
                                                            00012           1,423                  08/15/11   12/29/11    J MCBAIN INC                        
                                                            00013          19,508                  10/07/11   12/22/11    J. MCBAIN INC                       
                                                            00016             964                  10/07/11   12/22/11    J. MCBAIN INC                       
                                                            00018           5,717                  12/08/11   09/07/12    J. MCBAIN INC                       
                                                            00019             542                  09/19/11   11/23/11    BETTE & CRING                       
                                                            00031           4,763                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00033             837                  10/07/11   11/23/11    BETTE & CRING                       
                                                            00038           4,042                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00040           4,662                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00041           9,755                  12/08/11   07/24/12    BETTE & CRING                       
                                                            00046           1,478                  12/08/11   07/24/12    BETTE & CRING                       
 
09-0989   Reconstruction               0-005-013  04/01/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001            -702                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            00001           1,560                  01/05/11   02/18/11    CARSOUSEL INDUSTRIES                
                                                            00006             895                  01/05/11   02/18/11    SCHENECTADY HARDWARE & ELECTRIC     
                                                            00009             499                  01/05/11   02/18/11    ROSCH BROTHERS INC                  
 
18-0830   Reconstruction               0-005-017  01/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002         10,030                  06/29/20   08/04/20    KASSELMAN ELECTRIC CO.,INC.         
                                                            EC-004            962                  12/04/20   02/03/21    KASSELMAN ELECTRIC CO.,INC.         
                                                            GC-001          1,821                  01/03/20   02/03/20    WAINSCHAF ASSOCIATES, INC.          
                                                            GC-011         10,054                  11/27/20   05/07/21    WAINSCHAF ASSOCIATES, INC.          
                                                            MC-001         20,757                  09/15/20   11/25/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            MC-002          3,650                  09/15/20   11/25/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            MC-003          8,039                  09/15/20   11/25/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            MC-005         19,122                  09/29/20   11/05/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            MC-006          2,072                  10/08/20   12/04/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            MC-007          4,338                  10/22/20   12/30/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            MC-008          2,875                  10/22/20   12/30/20    CAMPITO PLUMBING & HEATING, INC.    
                                                            SC-002         20,730                  06/29/20   08/04/20    JAMES H. MALOY, INC.                
                                                            SC-003           -194                  06/29/20   08/04/20    JAMES H. MALOY, INC.                
 
18-2196   Reconstruction               0-005-018  07/23/19  NO CHANGE ORDERS ON ELECTRONIC FILE
21-1792   Reconstruction               0-005-019  02/08/22  NO CHANGE ORDERS ON ELECTRONIC FILE
22-1234   Reconstruction               0-005-020  02/21/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0976   Reconstruction               0-005-022  12/19/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1202FP Reconstruction               0-005-FP1  02/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Building:
18-0831   New Construction             2-019-001  01/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-003         21,010                  10/22/20   12/30/20    KASSELMAN ELECTRIC CO.,INC.         
                                                            GC-006        266,000                  10/22/20   01/06/21    WAINSCHAF ASSOCIATES, INC.          
                                                            GC-007         23,000                  10/22/20   01/06/21    WAINSCHAF ASSOCIATES, INC.          
 

          Bus Garage:
96-1634   Reconstruction               4-007-001  06/13/97  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0223   Reconstruction               4-007-007  01/20/11  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0832   Reconstruction               4-007-008  01/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-006          2,061                  12/04/20   02/03/21    KASSELMAN ELECTRIC CO.,INC.         
 

          Chatham Public Library:
91-0490   Reconstruction               6-012-002  12/18/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0489   Reconstruction               6-012-003  04/07/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            3               3,594                  05/07/04   05/19/04    Adams Plumbing                      
 
08-0683   Reconstruction               6-012-004  04/02/09  NO CHANGE ORDERS ON ELECTRONIC FILE
18-0833   Reconstruction               6-012-005  01/17/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-007          3,620                  12/04/20   02/03/21    KASSELMAN ELECTRIC CO.,INC.         
                                                            GC-005         28,274                  02/13/20   06/02/20    WAINSCHAF ASSOCIATES, INC.          
                                                            MC-009          1,410                  10/22/20   12/30/20    Campito Plumbing&Heating            
 

          Press Box @ Chatham HS:
05-0871   New Construction             7-014-001  05/01/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          District-Wide:
16-0149   Reconstruction               7-999-002  09/12/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001        -10,000                  02/16/17   02/24/17    J. McBain, Inc.                     
 
20-0811   Reconstruction               7-999-003  01/06/21  NO CHANGE ORDERS ON ELECTRONIC FILE
21-0234   Reconstruction               7-999-004  09/22/21  NO CHANGE ORDERS ON ELECTRONIC FILE

HUDSON CITY SD STATUS REPORT ON CAPITAL PROJECTS
District No.: 10-13-00-01
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          XXClaverack School (sold):
91-0707   Reconstruction               0-002-001  03/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1378   Reconstruction               0-002-003  07/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1492   Reconstruction               0-002-006  06/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RR2-001        -6,005                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-001A       -6,452                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-002A       -2,310                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-003A         -232                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
 

          XXGreenport ES (sold):
91-0708   Reconstruction               0-004-002  03/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1379   Reconstruction               0-004-004  07/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Montgomery C Smith Inter School:
91-0709   Reconstruction               0-006-001  03/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1171   Reconstruction               0-006-002  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0606   Additions and Alterations    0-006-003  04/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1380   Reconstruction               0-006-004  07/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0915   Reconstruction               0-006-005  06/14/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1278   Reconstruction               0-006-006  06/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00007         145,000                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
 
09-0115   Reconstruction               0-006-007  09/04/09  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1493   Reconstruction               0-006-008  06/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            P2AA-01             0                  07/30/14   10/29/14    PCC Contracting                     
                                                            P2CO-001       -3,300                  07/30/14   08/27/14    PCC Contracting                     
                                                            P2CO-002       -1,000                  07/30/14   10/29/14    PCC Contracting                     
                                                            RR2-002        33,907                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-003        -6,670                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-004         1,997                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-005          -600                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-01AA       -4,613                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR2-02AA       -1,312                  04/19/11   05/13/11    PLATO CONSTRUCTION                  
                                                            RR401          23,493                  07/30/14   10/29/14    A.B.C.D. Construction Group         
 
10-0866   Reconstruction               0-006-009  06/07/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            SWC01         -40,350                  11/18/11   03/30/12    AROLD CONSTRUCTION CO INC           
                                                            SWC02               0                  11/18/11   03/30/12    AROLD CONSTRUCTION CO INC           
                                                            SWC03           4,343                  02/16/12   10/23/12    AROLD CONSTRUCTION CO INC           
 
16-1582   Reconstruction               0-006-011  03/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE
16-1406   Additions and Alterations    0-006-012  08/29/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001         16,019                  01/10/19   02/11/19    HAROLD R. CLUNE, INC.               
                                                            EC-002         16,544                  09/30/19   10/02/19    HAROLD R. CLUNE, INC.               
                                                            EC-003         45,245                  09/30/19   10/02/19    HAROLD R. CLUNE, INC.               
                                                            GC-001         -5,910                  10/09/18   01/25/19    JERSEN CONSTRUCTION GROUP           
                                                            GC-002          9,651                  10/09/18   01/25/19    JERSEN CONSTRUCTION GROUP           
                                                            GC-003          6,424                  10/09/18   01/25/19    JERSEN CONSTRUCTION GROUP           
                                                            GC-004         38,119                  10/09/18   01/25/19    JERSEN CONSTRUCTION GROUP           
                                                            GC-005         30,647                  10/09/18   01/25/19    JERSEN CONSTRUCTION GROUP           
                                                            GC-006          2,016                  10/09/18   01/25/19    JERSEN CONSTRUCTION GROUP LLC       
                                                            GC-007          2,011                  10/09/18   01/25/19    JERSEN CONSTRUCTION GROUP LLC       
                                                            GC-008         49,950                  10/09/18   01/16/19    JERSEN CONSTRUCTION GROUP LLC       
                                                            GC-009         21,183                  01/10/19   03/12/19    JERSEN CONSTRUCTION GROUP           
                                                            GC-010          6,465                  01/10/19   03/12/19    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-011          8,001                  01/10/19   03/12/19    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-014         -1,100                  09/30/19   12/31/19    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-015        -26,014                  09/30/19   12/31/19    JERSEN CONSTRUCTION GROUP, LLC      
                                                            MC-001         71,784                  01/10/19   02/11/19    THE DIGESARE GROUP                  
                                                            MC-002        141,857                  09/30/19   10/02/19    THE DIGESARE GROUP                  
                                                            MC-003        -33,704                  09/30/19   10/02/19    THE DIGESARE GROUP                  
                                                            P-001           9,075                  01/10/19   02/12/19    MAZONE PLUMBING & HEATING, INC.     
                                                            P-002          -2,140                  01/10/19   02/06/19    MAZONE PLUMBING & HEATING, INC.     
                                                            P-003           4,410                  01/10/19   02/06/19    MAZONE PLUMBING & HEATING, INC.     
 
18-1926   Reconstruction               0-006-013  07/10/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AS.1-001       -5,000                  12/13/19   12/23/19    AKTOR CORP.                         
                                                            S.1-001        -3,905                  12/13/19   12/23/19    A. COLARUSSO & SON INC.             
 
22-0524   Reconstruction               0-006-014  10/12/22  NO CHANGE ORDERS ON ELECTRONIC FILE

          John Edwards Elementary-Vacant:
90-0743   Reconstruction               0-010-002  01/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0710   Reconstruction               0-010-003  03/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1172   Reconstruction               0-010-004  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1255   Reconstruction               0-010-005  06/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1410   Reconstruction               0-010-006  05/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1381   Reconstruction               0-010-008  07/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0916   Reconstruction               0-010-009  06/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001           -1,622                  04/28/09   07/21/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            1.2             1,326                  04/28/09   08/19/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            5.1            30,822                  04/28/09   08/11/09    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            5.2               621                  12/11/09   01/20/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            5.3             6,493                  12/11/09   01/20/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            5.4             1,511                  12/11/09   01/20/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            A2.2           -3,375                  12/16/09   02/05/10    WEATHERGUARD                        
 
07-1280   Additions and Alterations    0-010-010  06/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002           2,634                  11/23/09   03/12/10    JERSEN CONSTRUCTION GROUP           
                                                            00002           1,065                  02/26/10   03/19/10    NORTHEAST INTERIOR SYSTEMS INC      
                                                            00003           1,931                  02/05/10   04/30/10    WEATHERGUARD ROOFING CO             
                                                            00003           1,392                  02/26/10   03/19/10    NORTHEAST INTERIOR SYSTEMS INC      
                                                            00005           6,709                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00006             623                  02/26/10   03/19/10    KEY INTERIOR ACOUSTICAL INC         
                                                            00007          -1,722                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00008          -2,400                  02/26/10   05/13/10    WJV MECHANICAL INC                  
                                                            00009           7,365                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00009           3,493                  02/05/10   04/30/10    KEY INTERIOR ACOUSTICAL INC         
                                                            00011             590                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00011           1,430                  02/26/10     /  /      KEY INTERIOR ACOUSTICAL INC         
                                                            00012          12,762                  02/26/10   03/19/10    A. COLARUSSO & SON INC              
                                                            00013          14,270                  02/26/10   03/19/10    A. COLARUSSO & SON INC              
                                                            00014           5,000                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00014           2,401                  02/26/10   03/19/10    A. COLARUSSO & SON INC              
                                                            00015          12,710                  02/26/10   03/19/10    A. COLARUSSO & SON INC              
                                                            00016          11,457                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00017           3,014                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00018          14,579                  02/26/10   04/02/10    A. COLARUSSO & SON INC              
                                                            00019          12,729                  02/26/10   03/19/10    A. COLARUSSO & SON INC              
                                                            00020          11,572                  02/26/10   03/19/10    A. COLARUSSO & SON INC              
                                                            00021           6,500                  02/26/10     /  /      A. COLARUSSO & SON INC              
                                                            00025          -2,431                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00026          10,800                  02/05/10   04/30/10    A. COLARUSSO & SON INC              
                                                            00032          11,616                  02/26/10   04/02/10    A. COLARUSSO & SON INC              
                                                            00033          13,739                  02/26/10   03/19/10    A. COLARUSSO & SON INC              
                                                            1.11            1,673                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.2            14,661                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.30            3,972                  04/27/10     /  /      A. COLARUSSO & SON INC              
                                                            1.4             5,078                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            10.4A          -2,806                  04/27/10   07/19/10    CRISAFULLI BROS P&H                 
                                                            10.8            2,431                  07/16/10   09/29/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            11.12            -573                  02/05/10   06/14/10    WJV MECHANICAL INC                  
                                                            11.1A             254                  02/26/10   05/28/10    WJV MECHANICAL INC                  
                                                            11.4A          -3,492                  07/16/10   08/19/10    WJV MECHANICAL INC                  
                                                            12.10A          1,593                  02/26/10   03/30/10    HAROLD R CLUNE INC                  
                                                            12.3A             564                  11/23/09   03/12/10    HAROLD R CLUNE INC                  
                                                            2.3A           -5,142                  09/28/10   11/04/10    JERSEN CONSTRUCTION GROUP           
                                                            2.5A            3,600                  02/26/10   03/16/10    JERSEN CONSTRUCTION GROUP           
                                                            2.7A              250                  11/23/09   03/12/10    JERSEN CONSTRUCTION GROUP           
                                                            3.3A              280                  11/23/09   03/12/10    SCHENECTADY STEEL CO INC            
                                                            4.1A           -3,648                  07/16/10   08/19/10    NORTHEAST INTERIOR SYSTEMS INC      
                                                            5.1A             -895                  02/05/10   04/30/10    ARCH GLASS & MIRROR INC             
                                                            5.2             1,864                  04/27/10   07/16/10    ARCHITECTURAL GLASS & MIRROR INC    
                                                            5.2A            4,044                  02/26/10   05/28/10    ARCH GLASS & MIRROR INC             
                                                            5.3A              688                  11/23/09   03/12/10    ARCH GLASS & MIRROR INC             
                                                            5.4A           -1,873                  04/27/10   07/19/10    ARCH GLASS & MIRROR INC             
                                                            5.5             2,238                  07/16/10   09/29/10    ARCHITECTURAL GLASS & MIRROR INC    
                                                            6.19           11,102                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.2             3,157                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.3             1,920                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.3A             -535                  07/16/10   08/19/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.4A             -148                  07/16/10   08/19/10    KEY INTERIOR ACOUSTICAL INC         
                                                            7.1            14,870                  02/05/10     /  /      BUFFALO HOTEL SUPPLY CO INC         
                                                            7.1A           -7,500                  02/05/10   04/30/10    BUFFALO HOTEL SUPPLY CO INC         
 
09-1494   Reconstruction               0-010-011  06/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RR3-001        -4,323                  04/19/11   05/13/11    WEATHERGUARD TECTA AMERICA LLC      
                                                            RR3-002       -13,949                  04/19/11   05/13/11    WEATHERGUARD TECTA AMERICA LLC      
                                                            RR3-01AA       -5,665                  04/19/11   05/24/11    WEATHERGUARD TECTA AMERICA LLC      
                                                            RR3-02AA         -385                  04/19/11   05/13/11    WEATHERGUARD TECTA AMERICA LLC      
 
10-0867   Reconstruction               0-010-012  06/07/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 

          Hudson J/S High School:
91-0711   Additions and Alterations    0-012-002  03/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1173   Reconstruction               0-012-003  05/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1382   Reconstruction               0-012-005  07/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0917   Additions and Alterations    0-012-006  06/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          10,142                  12/11/09   01/21/10    MERIT PLUMBING & HEATING LLC        
                                                            00002          -5,768                  04/28/09   07/21/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            00002          12,126                  12/11/09   01/21/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            00003           7,592                  12/11/09   02/04/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            00004          10,253                  12/11/09   01/21/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            00005          -8,853                  12/11/09   01/21/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            1.1             2,654                  04/28/09   08/19/09    BUNKOFF GENERAL CONTRACTORS INC     
                                                            1.3            52,687                  06/30/09   03/22/12    BUNKOFF GENERAL CONTRACTORS INC     
                                                            1.4            41,122                  06/30/09   03/22/12    BUNKOFF GENERAL CONTRACTORS INC     
                                                            4.1            81,000                  06/30/09   08/05/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            4.2            12,844                  06/30/09   08/04/09    GENERAL MECHANICAL SYSTEMS INC      
                                                            5.1            11,661                  04/28/09   08/11/09    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            5.3              -624                  12/16/09   02/09/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            A1.1          -15,126                  12/16/09   02/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            A1.2            4,608                  12/16/09   02/05/10    BUNKOFF GENERAL CONTRACTORS INC     
                                                            A2.1            6,625                  12/16/09   02/05/10    WATHERGUARD                         
                                                            A2.2           -3,375                  12/16/09   01/27/10    WEATHERGUARD                        
                                                            A3.1              399                  12/16/09   01/27/10    MERIT PLUMBING                      
                                                            A3.2            6,595                  12/16/09   01/27/10    MERIT PLUMBING                      
                                                            A3.3            3,006                  12/16/09   01/27/10    MERIT PLUMBING                      
                                                            A4.1           -7,514                  12/16/09   01/27/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            A4.2             -266                  12/16/09   01/27/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            A4.5             -930                  12/16/09   01/27/10    GENERAL MECHANICAL SYSTEMS INC      
                                                            A5.1             -423                  12/16/09   01/27/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            A5.2           -6,882                  12/16/09   01/27/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            A5.4             -294                  12/16/09   01/27/10    SCHENECTADY HARDWARE & ELECTRIC     
                                                            A5.5           -1,583                  12/16/09   01/27/10    SCHENECTADY HARDWARE & ELECTRIC CO  
                                                            A6.1          -10,000                  12/16/09   01/27/10    CAPITAL ENVIRONMENTAL SERVICES      
 
07-1279   Additions and Alterations    0-012-007  06/30/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          19,700                  11/23/09   03/12/10    A. COLARUSSO & SON INC              
                                                            00001           4,620                  11/23/09   03/12/10    JERSEN CONSTRUCTION GROUP           
                                                            00001           5,348                  11/23/09   03/12/10    SCHENECTADY STEEL CO INC            
                                                            00001           4,830                  11/23/09   03/12/10    ARCHITECTURAL GLASS & MIRROR INC    
                                                            00001           6,413                  11/23/09   03/12/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00001          43,902                  11/23/09   03/12/10    HAROLD CLUNE ELECTRIC               
                                                            00001          -5,659                  02/05/10   04/30/10    EDWARD J MATTHEWS INC               
                                                            00001           4,668                  02/26/10   03/16/10    NORTHEAST INTERIOR SYSTEMS INC      
                                                            00001          -4,425                  02/26/10   03/30/10    WJV MECHANICAL INC                  
                                                            00002         -39,368                  11/23/09   03/12/10    SCHENECTADY STEEL CO INC            
                                                            00002          76,970                  11/23/09   03/12/10    HAROLD CLUNE ELECTRIC               
                                                            00002          14,000                  02/26/10   03/30/10    WJV MECHANICAL INC                  
                                                            00003          12,000                  11/23/09   03/12/10    JERSEN CONSTRUCTION GROUP           
                                                            00003         -22,700                  11/23/09     /  /      SCHENECTADY STEEL CO INC            
                                                            00003         102,500                  02/26/10   03/30/10    HAROLD CLUNE ELECTRIC               
                                                            00004           7,366                  11/23/09   03/12/10    JERSEN CONSTRUCTION GROUP           
                                                            00004             503                  02/05/10   04/30/10    KEY INTERIOR ACOUSTICAL INC         
                                                            00004          10,028                  02/05/10   04/30/10    SCHENECTADY STEEL CO INC            
                                                            00004           6,800                  02/26/10   03/30/10    HAROLD CLUNE ELECTRIC               
                                                            00005          -4,881                  02/05/10   04/21/10    JERSEN CONSTRUCTION GROUP           
                                                            00005           1,375                  02/05/10   04/30/10    SCHENECTADY STEEL CO INC            
                                                            00006          -2,208                  02/05/10   04/30/10    WEATHERGUARD ROOFING INC            
                                                            00006          12,028                  02/05/10   04/30/10    SCHENECTADY STEEL CO INC            
                                                            00006             921                  02/26/10   03/16/10    ARCHITECTURAL GLASS & MIRROR INC    
                                                            00006           7,587                  02/26/10   03/30/10    WJV MECHANICAL INC                  
                                                            00006           5,284                  02/26/10   03/30/10    HAROLD CLUNE ELECTRIC               
                                                            00007             240                  02/05/10   04/30/10    WEATHERGUARD ROOFING CO             
                                                            00007          10,495                  02/26/10   03/16/10    SCHENECTADY STEEL CO INC            
                                                            00008          12,930                  02/05/10   04/21/10    JERSEN CONSTRUCTION GROUP           
                                                            00008           7,664                  02/05/10   04/30/10    SCHENECTADY STEEL CO INC            
                                                            00008          10,713                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00009          -2,000                  02/05/10   04/30/10    SCHENECTADY STEEL CO INC            
                                                            00009           9,363                  02/26/10   03/30/10    WJV MECHANICAL INC                  
                                                            00009          10,723                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00010           2,758                  02/05/10   04/30/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            00010           7,801                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00010          13,971                  02/26/10   03/16/10    KEY INTERIOR ACOUSTICAL INC         
                                                            00010          10,500                  02/26/10   03/30/10    WJV MECHANICAL INC                  
                                                            00010           9,101                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00011          12,865                  02/26/10   03/30/10    WJV MECHANICAL INC                  
                                                            00011           7,191                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00012           9,775                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00012           4,956                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00013           3,700                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00015           6,000                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00016           2,604                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00016           8,391                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            00017           2,585                  02/05/10   04/21/10    A. COLARUSSO & SON INC              
                                                            00018           1,815                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00018           5,477                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00019           4,083                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00019           2,500                  02/26/10   05/13/10    HAROLD CLUNE ELECTRIC               
                                                            00020           6,801                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00021            -400                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00022           3,964                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00022           6,732                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            00023           6,187                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00023          14,590                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            00024          10,216                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00024           2,817                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            00025          12,216                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            00026          -3,000                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00027          11,210                  02/05/10   04/21/10    A. COLARUSSO & SON INC              
                                                            00027           3,144                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            00028          12,152                  02/05/10   04/21/10    A. COLARUSSO & SON INC              
                                                            00029           6,675                  02/05/10   04/21/10    A. COLARUSSO & SON INC              
                                                            00034          14,217                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            00035          14,500                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            00036          13,847                  02/26/10   03/16/10    A. COLARUSSO & SON INC              
                                                            1.10           12,030                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.1A            4,294                  11/23/09   03/12/10    A. COLARUSSO & SON INC              
                                                            1.2A          -15,000                  07/16/10   08/19/10    A COLARUSSO & SON INC               
                                                            1.3            11,041                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.31            5,923                  04/27/10   07/16/10    A. COLARUSSO & SON INC              
                                                            1.3A             -706                  02/26/10   03/16/10    A COLARUSSO & SON INC               
                                                            1.5            10,600                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.6            11,440                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.7            14,764                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.8            14,812                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            1.9            12,652                  07/16/10   09/29/10    A. COLARUSSO & SON INC              
                                                            10.1A           3,932                  11/23/09   03/12/10    CRISAFULLI BROS P&H                 
                                                            10.2           14,000                  04/27/10   07/16/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            10.2A          -4,885                  04/27/10   07/19/10    CRISAFULLI BROS P&H                 
                                                            10.3           14,000                  04/27/10   07/16/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            10.3A          -1,558                  07/16/10   08/19/10    CRISAFULLI BROS P&H                 
                                                            10.4           11,131                  04/27/10   07/16/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            10.5           13,000                  04/27/10   07/16/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            10.5A            -830                  04/27/10   07/19/10    CRISAFULLI BROS P&H                 
                                                            10.6           12,000                  04/27/10   07/16/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            10.6A            -301                  04/27/10   07/19/10    CRISAFULLI BROS P&H                 
                                                            10.7           10,110                  04/27/10   07/16/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            10.7A           5,688                  02/05/10   04/30/10    CRISAFULLI BROS P&H                 
                                                            10.9             -485                  04/27/10   07/16/10    CRISAFULLI BROS PLUMBING & HEATING  
                                                            11.13          -1,079                  04/27/10   07/16/10    WJV MECHANICAL INC                  
                                                            11.2A            -132                  07/16/10   08/19/10    WJV MECHANICAL INC                  
                                                            11.3           14,051                  04/27/10   07/16/10    WJV MECHANICAL INC                  
                                                            11.3A           8,844                  04/27/10   07/19/10    WJV MECHANICAL INC                  
                                                            11.4            9,994                  04/27/10   07/16/10    WJV MECHANICAL INC                  
                                                            11.5           -5,356                  04/27/10   07/16/10    WJV MECHANICAL INC                  
                                                            11.5A          -1,201                  04/27/10   07/19/10    WJV MECHANICAL INC                  
                                                            11.6A          -2,399                  04/27/10   07/19/10    WJV MECHANICAL INC                  
                                                            11.7            8,258                  04/27/10   07/16/10    WJV MECHANICAL INC                  
                                                            11.7A          -2,208                  02/26/10   03/30/10    WJV MECHANICAL INC                  
                                                            11.8A          -1,470                  04/27/10   07/19/10    WJV MECHANICAL INC                  
                                                            12.13          13,000                  07/16/10   09/29/10    HAROLD CLUNE ELECTRIC               
                                                            12.14           8,843                  09/28/10   11/04/10    HAROLD CLUNE ELECTRIC               
                                                            12.15          13,000                  04/27/10   07/16/10    HAROLD CLUNE ELECTRIC               
                                                            12.17           7,989                  04/27/10   07/16/10    HAROLD CLUNE ELECTRIC               
                                                            12.1A           1,949                  11/23/09   03/12/10    HAROLD R CLUNE INC                  
                                                            12.2A           1,075                  11/23/09   03/12/10    HAROLD R CLUNE INC                  
                                                            12.4A            -311                  04/27/10   07/19/10    HAROLD R CLUNE INC                  
                                                            12.5A          -2,985                  04/27/10   07/19/10    HAROLD R CLUNE INC                  
                                                            12.6A          -1,493                  04/27/10   07/19/10    HAROLD R CLUNE INC                  
                                                            12.7A            -503                  04/27/10   07/19/10    HAROLD R CLUNE INC                  
                                                            12.8A          -9,234                  04/27/10   07/19/10    HAROLD R CLUNE INC                  
                                                            12.9A            -293                  04/27/10   07/19/10    HAROLD R CLUNE INC                  
                                                            2.1A            3,250                  11/23/09   03/12/10    JERSEN CONSTRUCTION GROUP           
                                                            2.2A             -825                  02/05/10   04/30/10    JERSEN CONSTRUCTION GROUP           
                                                            2.6            12,539                  04/27/10   07/16/10    JERSEN CONSTRUCTION GROUP           
                                                            2.6A            1,552                  12/23/09   03/12/10    JERSEN CONSTRUCTION GROUP           
                                                            2.8A           -1,124                  07/16/10   08/19/10    JERSEN CONSTRUCTION GROUP           
                                                            3.1A              495                  11/23/09   03/12/10    SCHENECTADY STEEL CO INC            
                                                            3.2A              457                  11/23/09   03/12/10    SCHENECTADY STEEL CO INC            
                                                            3.4A            4,175                  11/23/09   03/12/10    SCHENECTADY STEEL CO INC            
                                                            3.5A           -4,593                  02/05/10   04/30/10    SCHENECTADY STEEL CO INC            
                                                            3.9            -2,000                  04/27/10   07/16/10    SCHENECTADY STEEL CO INC            
                                                            4.2A           -1,352                  02/05/10   04/30/10    NORTHEAST INTERIOR SYSTEMS INC      
                                                            4.4             8,490                  04/27/10   07/16/10    NORTHEAST INTERIOR SYSTEMS INC      
                                                            5.3             5,636                  04/27/10   07/16/10    ARCHITECTURAL GLASS & MIRROR INC    
                                                            5.4            -3,014                  04/27/10   07/16/10    ARCHITECTURAL GLASS & MIRROR INC    
                                                            5.7             2,780                  04/27/10   07/16/10    ARCHITECTURAL GLASS & MIRROR INC    
                                                            6.1             9,007                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.12            3,500                  04/27/10   07/16/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.13           13,504                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.14            3,379                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.15            9,600                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.16            3,695                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.17           11,097                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.18           10,543                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.1A           -7,400                  02/05/10   04/30/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.20           14,162                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.21            3,510                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.22           11,918                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.23           12,490                  07/16/10   09/29/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.2A           -1,917                  07/16/10   08/19/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.5             5,288                  04/27/10   07/16/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.7            10,448                  02/05/10   06/14/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.7            10,448                  04/27/10   07/16/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.8             6,296                  02/05/10   06/14/10    KEY INTERIOR ACOUSTICAL INC         
                                                            6.8             6,296                  04/27/10   07/16/10    KEY INTERIOR ACOUSTICAL INC         
                                                            7.2            -1,783                  04/27/10   07/16/10    BUFFALO HOTEL SUPPLY CO INC         
                                                            8.1             7,020                  02/05/10     /  /      WEATHERGUARD ROOFING CO             
                                                            8.1A            9,886                  02/05/10   04/30/10    WEATHERGUARD ROOFING CO             
                                                            8.2             2,348                  04/27/10   07/16/10    WEATHERGUARD ROOFING CO             
                                                            8.2A             -114                  02/05/10   04/30/10    WEATHERGUARD ROOFING CO             
                                                            8.4            13,342                  07/16/10   09/29/10    WEATHERGUARD ROOFING CO             
                                                            8.5             8,098                  02/05/10   06/14/10    WEATHERGUARD ROOFING CO             
                                                            8.8             6,820                  04/27/10   07/16/10    WEATHERGUARD ROOFING CO             
                                                            9.1A            5,841                  02/05/10   04/30/10    EDWARD J MATTHEWS INC               
 
09-1495   Reconstruction               0-012-008  06/14/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RR1-001         2,073                  04/19/11   05/13/11    JAMES A EDGAR COMPANY INC           
                                                            RR1-001A      -24,777                  04/19/11   05/13/11    JAMES A EDGAR COMPANY INC           
                                                            RR1-002         4,499                  04/19/11   05/13/11    JAMES A EDGAR COMPANY INC           
                                                            RR1-002A         -223                  04/19/11   05/13/11    JAMES A EDGAR COMPANY INC           
                                                            RR1-003       -11,785                  04/19/11   05/13/11    JAMES A EDGAR COMPANY INC           
 
10-0868   Reconstruction               0-012-009  06/07/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PWC-001      -170,185                  11/18/11   01/25/13    MERIT PLUMBING & HEATING            
                                                            PWC-02AA            0                  11/18/11   10/09/12    MERIT PLUMBING & HEATING            
                                                            PWC-03AA            0                  02/16/12   09/12/12    MERIT PLUMBING & HEATING            
                                                            PWC-04AA            0                  04/10/12   10/05/12    MERIT PLUMBING & HEATING            
                                                            PWC-05AA         -535                  04/10/12   10/05/12    MERIT PLUMBING & HEATING            
 
16-1583   Reconstruction               0-012-010  03/12/18  NO CHANGE ORDERS ON ELECTRONIC FILE
16-0590   Reconstruction               0-012-011  12/28/16  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              18,147                  10/27/17   11/08/17    Shaker Flats                        
                                                            10             42,380                  07/02/18   07/24/18    SHAKER FLATS                        
                                                            11              1,849                  07/02/18   07/24/18    SHAKER FLATS                        
                                                            2              30,705                  10/27/17   11/08/17    Shaker Flats                        
                                                            3               8,977                  10/27/17   11/08/17    Shaker Flats                        
                                                            4              75,305                  10/27/17   11/08/17    Shaker Flats                        
                                                            5               5,002                  07/02/18     /  /      SHAKER FLATS                        
                                                            AD#1                0                  10/27/17   11/08/17    Shaker Flats Landscaping, Inc.      
                                                            AD#2                0                  10/27/17   11/08/17    Shaker Flats Landscaping, Inc.      
                                                            AD#3                0                  10/27/17   11/08/17    Shaker Flats Landscaping, Inc.      
                                                            AD#4                0                  10/27/17   11/08/17    Shaker Flats Landscaping, Inc.      
                                                            AD#5                0                  10/27/17   11/10/17    Shaker Flats Landscaping, Inc.      
                                                            AD#6                0                  10/27/17   11/08/17    Shaker Flats Landscaping, Inc.      
                                                            AD#7                0                  10/27/17   11/08/17    Shaker Flats Landscaping, Inc.      
                                                            GC-CO-05        5,002                  12/26/17   07/24/18    Shaker Flats Landscaping Co.        
                                                            GC-CO-06        2,991                  12/26/17   01/23/18    Shaker Flats Landscaping Co.        
                                                            GC-CO-07       22,859                  12/26/17   01/23/18    Shaker Flats Landscaping Co.        
                                                            GC-CO-08        2,995                  12/26/17   01/23/18    Shaker Flats Landscaping Co.        
                                                            GC-CO-09       -1,979                  12/26/17   01/23/18    Shaker Flats Landscaping Co.        
 
18-1927   Reconstruction               0-012-012  07/10/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXNew Elementary School-NeverBuilt:
95-0594   New Construction             0-013-001  04/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          M.C Smith School:
19-0840   New Construction             0-023-001  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hudson High School:
19-0841   New Construction             0-024-001  02/17/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          PPA-Stand Alone Solar Array:
16-0676   New Construction             7-021-001  10/26/16  NO CHANGE ORDERS ON ELECTRONIC FILE

          Presssbox @ Hudson Jr/Sr HS:
16-1077   New Construction             7-022-001  12/28/16  NO CHANGE ORDERS ON ELECTRONIC FILE

ICHABOD CRANE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 10-14-01-04
last updated on 01/10/24

REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Ichabod Crane Primary:
91-1256   Reconstruction               0-001-005  05/15/92  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
 
92-1183   Reconstruction               0-001-007  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0400   Reconstruction               0-001-008  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1338   Reconstruction               0-001-009  07/02/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PV-1            8,670                  09/17/03   09/19/03    Bob Talham                          
                                                            TS-2           13,030                  11/01/01   01/08/02    Integrated Systems Communications   
                                                            TS-3            9,399                  11/28/01     /  /      Integrated Systems Communications   
 
00-0179   Reconstruction               0-001-010  09/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-14             547                  03/30/04   04/08/04    Schenectady Hardware & Elec.        
                                                            EC-15           4,239                  09/13/04   10/25/04    Schenectady Hardware & Elec.        
                                                            EC-5           18,480                  06/20/02   07/12/02    Schenectady Hardware & Elec.        
                                                            EC-6           16,170                  07/16/02   07/24/02    Schenectady Hardware & Elec.        
                                                            EC-8           22,050                  08/02/02   08/16/02    Schenectady Hardware & Elec.        
                                                            GC-5           15,790                  06/20/02   07/12/02    Bunkoff General Contractors         
                                                            MC-2           10,041                  03/04/02   04/18/02    T. McElligott                       
 
07-1526   Reconstruction               0-001-012  03/06/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2            9,474                  11/24/08   04/03/09    CANALE ELECTRIC CORP.               
                                                            EC-3            7,416                  11/24/08   04/03/09    CANALE ELECTRIC CORP.               
                                                            RC-1           -1,606                  11/24/08   04/03/09    S.D. CARRUTHERS SONS, INC.          
 
08-0562   Reconstruction               0-001-013  04/08/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            2,000                  09/14/09   10/09/09    HAROLD R CLUNE INC                  
                                                            EC-2          -18,782                  05/24/10   07/30/10    HAROLD R CLUNE INC                  
                                                            GC-1           18,237                  06/17/10   08/06/10    ROSCH BROTHERS INC                  
                                                            MC-1           60,760                  09/14/09   10/09/09    CAMPITO PLUMBING & HEATING INC      
                                                            MC-2          -14,400                  12/18/09   01/12/10    CAMPITO PLUMBING AND HEATING        
                                                            MC-3           -4,683                  07/22/10   11/18/10    CAMPITO PLUMBING & HEATING INC      
                                                            PC-1           -2,175                  04/26/10   07/21/10    CAMPITO PLUMBING & HEATING INC      
 
12-1185   Reconstruction               0-001-014  06/27/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GL-1             -837                  04/04/16   12/28/16    B R Johnson, Inc.                   
                                                            WD-2          -18,293                  01/26/15   02/03/15    Hoosick Valley Contractors, Inc.    
 
13-0335   Reconstruction               0-001-015  03/28/14  NO CHANGE ORDERS ON ELECTRONIC FILE
14-0527   Additions and Alterations    0-001-016  07/24/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3            8,882                  02/01/17   02/16/17    Harold R. Clune, Inc.               
                                                            EC-4            6,979                  05/04/17   05/10/17    Harold R. Clune, Inc.               
                                                            GC-1           19,412                  09/12/16   10/25/16    Bast Hatfield, Inc.                 
                                                            GC-2           11,458                  09/12/16   10/25/16    Bast Hatfield, Inc.                 
                                                            GC-4            7,843                  01/12/17   01/27/17    Bast Hatfield, Inc.                 
                                                            GC-6           20,563                  01/20/17   01/27/17    Bast Hatfield, Inc.                 
                                                            GC-7             -754                  01/20/17   01/27/17    Bast Hatfield, Inc.                 
                                                            MC-1           -5,000                  01/20/17   01/24/17    Campito Plumbing & Heating, Inc.    
 
19-1084   Reconstruction               0-001-018  05/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-007              0                  07/06/21   03/16/22    Harold R. Clune Inc                 
                                                            EC-022          5,760                  07/06/21   03/16/22    Harold R. Clune Inc.                
                                                            FA-007            209                  06/01/21   08/27/21    FS&S                                
                                                            FA-008          2,160                  06/01/21   08/27/21    FS&S                                
                                                            FA-009          2,803                  06/01/21   08/27/21    FS&S                                
                                                            GC-005          2,424                  12/09/20   03/10/21    BAST HATFIELD                       
                                                            GC-039            582                  10/25/21   12/06/22    Bast Hatfield                       
                                                            PC-011            727                  10/25/21   12/09/22    Tri Valley Plumb&Heat               
                                                            PC-012          1,764                  10/25/21   12/09/22    Tri-Valley Plumbing&Heat            
 
20-0886   Reconstruction               0-001-019  05/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1368FP Reconstruction               0-001-FP1  03/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ichabod Crane High School:
91-1574   Additions and Alterations    0-002-006  07/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1255   Additions and Alterations    0-002-007  05/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1182   Reconstruction               0-002-009  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0402   Reconstruction               0-002-010  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1339   Reconstruction               0-002-011  07/02/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1            8,762                  12/15/03   12/30/03    Henderson-Johnson                   
                                                            RC-4           12,000                  11/04/02   02/05/03    Henderson-Johnson                   
                                                            RC-5            5,500                  01/02/03   03/13/03    Henderson-Johnson                   
 
99-1008   Additions and Alterations    0-002-012  07/07/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3           -1,146                  11/04/02   12/10/02    Harold R. Clune                     
                                                            MC-10          10,916                  07/11/03   07/23/03    T. McElligott                       
                                                            MC-11          13,419          13,419  12/08/03   12/24/03    T. McElligott                       
                                                            MC-13          -7,950                  09/17/03   09/23/03    T. McElligott                       
                                                            MC-5           11,688                  11/04/02   12/10/02    T. McElligott                       
                                                            MC-6           15,720                  12/12/02   03/06/03    T. McElligott                       
                                                            MC-8            5,958                  03/04/03   03/18/03    T. McElligott                       
 
00-0180   Reconstruction               0-002-013  09/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           -9,187                  09/14/01   01/03/03    Harold Clune                        
                                                            EC-11           9,577                  12/08/03   12/24/03    Schenectady Hardware                
                                                            EC-12           4,185                  03/22/04   04/30/04    Schenectady Hardware                
                                                            EC-7           20,895                  07/29/02   08/16/02    Schenectady Hardware                
                                                            GC-1           11,559                  11/21/01   02/11/02    Bunkoff Gen. Contractors            
                                                            GC-4            2,189                  02/22/02   04/01/02    Bunkoff                             
                                                            MC-1           10,489                  02/22/02   04/01/02    T. McElligott                       
                                                            MC-12          12,998                  01/20/04   02/03/04    T. McElligott                       
                                                            MC-3            4,426                  05/24/02   06/04/02    T. McElligott                       
                                                            MC-4            1,691                  05/24/02   06/04/02    T. McElligott                       
                                                            PC-1            2,588                  09/14/01   08/28/02    Crisafulli Bros.                    
                                                            PC-4             -851                  02/14/02   03/25/02    Crisafulli Bros.                    
 
03-0536   Reconstruction               0-002-015  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1           -3,500                  01/27/05   02/08/05    Midlantic Environmental             
                                                            EC-1           -4,494                  11/10/05   12/07/05    STILSING ELECTRIC, INC.             
                                                            GC-2          -14,709                  02/03/05   03/02/05    Bunkoff General Contractors         
                                                            GC-3           -7,824                  04/09/05   03/31/05    Bunkoff General Contractors         
                                                            GC-4           -1,339                  04/13/05   06/14/05    Bunkoff General Contractors         
                                                            MC-1           -8,460                  04/09/05   05/02/05    T Mc Elligott Inc                   
                                                            SR-1           -2,563                  08/31/05   09/01/05    Syracuse Scenery Stage Lighting     
                                                            SW-1           17,223                  04/09/05   03/31/05    Valley equipment Company            
                                                            SW-2            7,506                  04/03/06   04/10/06    Valley Equipment                    
                                                            TL-1           -2,000                  06/15/05   08/19/05    Syracuse Scenery Stage Lighting     
                                                            TS-1           -2,000                  01/27/05   03/17/05    Brown Sound Equipment               
 
09-0684   Reconstruction               0-002-016  01/06/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-1           -3,302                  06/17/10   08/06/10    KLD MECHANICAL INC                  
 
12-1186   Reconstruction               0-002-017  06/27/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MR-1             -158                  12/23/13   06/27/14    Western Building Restoration Co.    
                                                            RC-1           -7,437                  10/28/13   12/06/13    S.D. Carruthers Sons, Inc.          
                                                            TR-1             -230                  11/04/13   12/04/13    COPELAND COATING CO INC             
 
13-0336   Reconstruction               0-002-018  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AE-2            1,593                  02/20/15   02/26/15    Facilities Equipment and Serivce    
                                                            AE-3            7,094                  03/02/15   03/05/15    Facilites Equipment and Services    
                                                            EC-1            2,810                  10/06/14   10/08/14    J. McBain, Inc.                     
                                                            EC-2            2,752                  10/06/14   10/08/14    J. McBain, Inc.                     
                                                            EC-3            4,943                  10/27/14   11/12/14    J. McBain, Inc.                     
                                                            EC-4           -1,538                  01/02/15   01/08/15    J. McBain, Inc.                     
                                                            EC-5            7,612                  01/08/15   01/13/15    J. McBain, Inc.                     
                                                            GC-1           13,731                  08/06/14   08/28/14    Hoosick Valley Contractors, Inc.    
                                                            GC-12          -6,078                  03/09/15   03/30/15    Hoosick Valley Contractors, Inc.    
                                                            GC-3           37,011                  09/22/14   09/26/14    Hoosick Valley Contractors, Inc.    
                                                            GC-4           24,815                  12/10/14   12/15/14    Hoosick Valley Contractors, Inc.    
                                                            GC-5           18,769                  12/10/14   12/15/14    Hoosick Valley Contractors, Inc.    
                                                            GC-6           34,838                  12/10/14   12/15/14    Hoosick Valley Contractors, Inc.    
                                                            GC-7           20,654                  01/02/15   01/08/15    Hoosick Valley Contractors, Inc.    
                                                            GC-8           31,311                  01/16/15   01/22/15    Hoosick Valley Contractors, Inc.    
                                                            GC-9            4,420                  01/16/15   01/22/15    Hoosick Valley Contractors, Inc.    
                                                            MC-1                0                  02/11/15   02/17/15    T.McElligott, Inc.                  
                                                            PC-1            5,649                  10/01/14   10/08/14    Ackerman Plumbing, Inc.             
                                                            PC-2           -7,697                  12/03/14   12/09/14    Ackerman Plumbing, Inc.             
                                                            WD-3             -950                  01/26/15   01/30/15    Hoosick Valley Contractors, Inc.    
 
14-0491   Reconstruction               0-002-019  03/09/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1             -246                  10/07/15   11/18/15    Wainschaf Associates, Inc.          
 
18-1828   Reconstruction               0-002-021  05/29/19  NO CHANGE ORDERS ON ELECTRONIC FILE
19-1085   Additions and Alterations    0-002-022  05/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            AC-001          5,779                  09/21/20   11/24/20    AKTOR CORP.                         
                                                            AC-002         -2,662                  03/15/21   05/13/21    AKTOR CORP.                         
                                                            AC-002         22,291                  10/25/21   12/06/22    MJs Contracting Services, Inc       
                                                            AC-003       -560,825                  06/01/21   09/23/21    AKTOR CORP                          
                                                            AC-M-04        16,080                  01/27/22   01/27/23    MJs Contr Servs Inc                 
                                                            AC-M-05        37,123                  01/27/22   01/27/23    MJ Contr                            
                                                            AC-M-07        -2,556                  07/22/22     /  /      MJ Contrg Servs Inc                 
                                                            AC-M-08        10,053                  07/22/22   05/22/23    MJs Contrg Servs Inc                
                                                            AD-GC001            0                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            AD-PC001            0                  12/09/20   02/23/21    tRI-VALLEY PLUMBING & HEATING       
                                                            ADAC-003            0                  01/27/22   02/01/23    MJ Contr Servs Inc                  
                                                            ADEC-001            0                  09/21/20   11/24/20    HAROLD R. CLUNE, INC.               
                                                            ADEC-002            0                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            ADEC-005            0                  03/15/21   05/13/21    HAROLD R. CLUNE, INC.               
                                                            ADEC-010            0                  12/23/22   12/11/23    Harold Clune Inc                    
                                                            ADGC-004            0                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            ADGC-007            0                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            ADGC-025            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-026            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-027            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-029            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-030            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-031            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-031            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-033            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-034            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-035        4,009                  03/14/22   02/22/23    Bast Hatfield                       
                                                            ADGC-036          525                  03/14/22   02/22/23    Bast Hatfield                       
                                                            ADGC-037          835                  03/14/22   02/22/23    Bast Hatfield                       
                                                            ADMC-03             0                  01/27/22   01/25/23    Collett Mech                        
                                                            ADMC-04             0                  01/27/22   01/25/23    Collett Mech                        
                                                            ADMC-05             0                  01/27/22   01/25/23    Collett Mech                        
                                                            ADMC-06             0                  01/27/22   01/25/23    Collett Mech                        
                                                            ADMC-07             0                  01/27/22   01/25/23    Collett Mech                        
                                                            ADMC-08             0                  03/14/22   02/17/23    Collett Mech                        
                                                            ADMC-09             0                  03/14/22   02/17/23    Collett Mech                        
                                                            ADPC-002            0                  12/18/20   03/08/21    TRI-VALLEY PLUMBING & HEATING       
                                                            ADPC-004            0                  01/27/21   03/24/21    TRI-VALLEY PLUMBING & HEATING       
                                                            ADPC-005            0                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            CC-001          1,075                  06/01/21   09/23/21    TBS                                 
                                                            CC-002          7,177                  10/25/21   12/08/22    Techincal Bldg Services             
                                                            CC-004          3,552                  10/25/21   12/08/22    Technical Bldg Services             
                                                            CC-005          2,304                  10/25/21   12/08/22    Technical Bldg Services             
                                                            CC-006          7,601                  10/25/21   12/08/22    Technical Building Services         
                                                            CC-007          2,122                  03/14/22   02/17/23    Tech Bldg Servs                     
                                                            CC-008          3,373                  03/14/22   02/17/23    Tech Bldg Servs                     
                                                            CC-010         -8,405                  04/14/22   02/17/23    Tech Bldg Servs                     
                                                            CC-012          5,268                  03/14/22   02/17/23    Tech Bldg Servs                     
                                                            CO-FA-02          784                  06/01/21   09/23/21    Fire, Security & Sound Systems, Inc.
                                                            COFA006           719                  06/01/21     /  /      FS&S                                
                                                            EC-002         10,486                  12/09/20   02/23/21    HAROLD R. CLUNE, INC.               
                                                            EC-003           -678                  12/09/20   02/23/21    HAROLD R. CLUNE, INC.               
                                                            EC-005         17,990                  12/18/20   03/08/21    HAROLD R. CLUNE, INC.               
                                                            EC-006              0                  07/06/21   03/16/22    Harold R.Clune Inc                  
                                                            EC-007          3,865                  12/18/20   03/08/21    HAROLD R. CLUNE, INC.               
                                                            EC-008          3,613                  10/25/21   12/08/22    Harold Clune, Inc                   
                                                            EC-011          4,134                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            EC-014          2,411                  03/15/21   05/13/21    HAROLD R. CLUNE, INC.               
                                                            EC-015            431                  03/15/21   05/13/21    HAROLD R. CLUNE, INC.               
                                                            EC-016          1,060                  03/15/21   05/13/21    HAROLD R. CLUNE, INC.               
                                                            EC-018          5,617                  06/01/21   09/23/21    HAROLD R. CLUNE                     
                                                            EC-020          4,702                  07/06/21   03/16/22    Harold R. Clune Inc                 
                                                            EC-021          1,857                  07/06/21   03/16/22    Harold R. Clune Inc                 
                                                            EC-024          3,940                  08/12/21   04/26/22    HAROLD CLUNE, INC                   
                                                            EC-025            673                  08/12/21   04/19/22    HAROLD CLUNE, INC                   
                                                            EC-026          2,533                  08/12/21   04/19/22    HAROLD CLUNE, INC                   
                                                            EC-028          2,661                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-029          6,319                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-030          2,370                  10/25/21   12/08/22    Harold Clune, Inc                   
                                                            EC-035          4,385                  01/27/22   01/25/23    Harold Clune Inc                    
                                                            EC-037          2,200                  01/27/22   01/25/23    Harold Clune Inc                    
                                                            EC-038         13,742                  03/14/22     /  /      Harold Clune Inc                    
                                                            EC-039         10,878                  03/14/22   02/17/23    Harold Clune Inc                    
                                                            EC-040          5,257                  03/14/22   05/04/23    Harold Clune Inc                    
                                                            EC-043          2,160                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-044          3,974                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-045          2,709                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-048          1,214                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-056          2,854                  11/25/22   10/24/23    HAROLD R CLUNE INC                  
                                                            EC-058          9,618                  12/23/22   12/11/23    Harold Clune Inc                    
                                                            EC-059        -64,798                  12/23/22   12/11/23    Harold Clune Inc                    
                                                            EC-060          3,356                  12/23/22   12/11/23    Harold Clune Inc                    
                                                            FA-006            719                  06/01/21   08/27/21    FS&S                                
                                                            FA-011          5,131                  07/22/22   03/23/23    Fire Sec&Sound Sys Inc              
                                                            GC-002          4,284                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-004          1,164                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-007        -13,200                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-009          1,556                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-010            513                  06/01/21   09/23/21    BAST HATFIELD                       
                                                            GC-012            -92                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            GC-012          8,047                  06/01/21   03/11/22    GRIDWORKS                           
                                                            GC-013          9,268                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            GC-014           -385                  03/22/21   05/11/21    BAST HATFIELD                       
                                                            GC-014          1,639                  06/01/21   09/23/21    BAST HATFIELD                       
                                                            GC-015          6,376                  06/01/21   02/01/22    BAST HATFIELD                       
                                                            GC-016          4,018                  06/01/21   03/11/22    BAST HATFIELD                       
                                                            GC-018            907                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-019          3,844                  06/01/21   07/15/21    Bast Hatfield                       
                                                            GC-019          7,056                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-020          2,433                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-021           -893                  06/01/21   07/15/21    Bast Hatfield                       
                                                            GC-022            668                  06/01/21   07/15/21    Bast Hatfield                       
                                                            GC-023          7,604                  06/01/21   09/23/21    BAST HATFIELD                       
                                                            GC-023          6,267                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-024          3,234                  06/01/21   09/23/21    BAST HATFIELD                       
                                                            GC-025         -3,800                  06/01/21   09/23/21    BAST HATFIELD                       
                                                            GC-026          1,484                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-028         -1,436                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-029         11,684                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-030          1,641                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-031         -3,165                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-034           -703                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-035            866                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-036            613                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-038          2,738                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-042            553                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-043         26,601                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-046          3,210                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-047          2,129                  01/27/22   02/01/23    Bast Hatfield                       
                                                            GC-048          2,481                  01/27/22   02/01/23    Bast Hatfield                       
                                                            GC-049          3,563                  01/27/22   02/01/23    Bast Hatfield                       
                                                            GC-050         24,889                  01/27/22   02/01/23    Bast Hatfield                       
                                                            GC-053          2,275                  01/27/22   02/01/23    Bast Hatfield                       
                                                            GC-056         -1,006                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-057         10,022                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-059          2,441                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-060          3,130                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-063         -2,511                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-066          5,527                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-067          8,190                  03/14/22     /  /      Bast Hatfield                       
                                                            GC-067          8,190                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-069          8,561                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-070         18,260                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-071           -629                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-072         -9,843                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-074          6,716                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-077           -819                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-078          1,208                  07/22/22     /  /      Bast Hatfield                       
                                                            GC-082         78,602                  11/25/22   12/21/23    BAST HATFIELD                       
                                                            GC-085         -1,358                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-086          6,151                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-093          4,682                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-096          5,431                  11/25/22   12/15/23    BAST HATFIELD                       
                                                            GC-097          8,080                  11/25/22   10/24/23    BAST HATFIELD                       
                                                            GC-097          2,989                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-100         29,590                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-101          1,839                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-102            996                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-103          1,370                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-104          1,168                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-105          8,465                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-107          7,019                  12/23/22   12/11/23    Bast Hatfield                       
                                                            GC-52           5,034                  01/27/22   02/01/23    Bast Hatfield                       
                                                            MC-001          4,217                  03/15/21   05/13/21    COLLETT MECHANICAL                  
                                                            MC-002         -1,136                  03/15/21   05/13/21    COLLETT MECHANICAL                  
                                                            MC-004           -766                  08/12/21   04/19/22    COLLETT MECH                        
                                                            MC-005         -8,800                  08/12/21   04/19/22    COLLETT MECH                        
                                                            MC-006          3,644                  08/12/21   04/19/22    COLLETT MECH                        
                                                            MC-007          2,800                  08/12/21   04/19/22    COLLETT MECH                        
                                                            MC-008          6,392                  10/25/21   12/08/22    Collett Mech                        
                                                            MC-010          3,907                  01/27/22   01/25/23    Collett Mech                        
                                                            MC-012          3,024                  01/27/22   01/25/23    Collett Mech                        
                                                            MC-014          4,034                  03/14/22   02/17/23    Collett Mech                        
                                                            MC-015          1,120                  03/14/22   02/17/23    Collett Mech                        
                                                            MC-017          4,002                  07/22/22   03/23/23    Collett Mech                        
                                                            MC-019          2,188                  07/22/22   03/23/23    Collett Mech                        
                                                            MC-020         17,371                  07/22/22   03/23/23    Collett Mech                        
                                                            MC-022        -82,044                  11/25/22   10/24/23    COLLETT MECHANICAL                  
                                                            MC-022        -82,044                  12/23/22     /  /      Collett Mech                        
                                                            MC-09          10,157                  01/27/22   01/25/23    Collett Mech                        
                                                            MC-13           1,355                  01/27/22   01/25/23    Collett Mech                        
                                                            PC-001          2,822                  12/18/20   03/08/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-002          3,019                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-003          2,259                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-005          4,440                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-006          3,719                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-006              0                  07/06/21     /  /      Tri-Valley Plumbing and Heating     
                                                            PC-007          7,868                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-007          2,040                  08/12/21   04/19/22    TRI-VALLEY PLUMB&HEAT               
                                                            PC-008          1,799                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-008          2,745                  08/12/21   04/19/22    TRI-VALLEY PLUMB & HEAT             
                                                            PC-009          2,139                  07/06/21   03/16/22    Tri-Valley Plumbing and Heating     
                                                            PC-010          4,284                  10/25/21   12/08/22    Tri-Valley Plumbing&Heat            
                                                            PC-011            437                  08/12/21   04/20/22    TRI-VALLEY PLUMB&HEAT               
                                                            PC-012          1,579                  10/25/21   12/08/22    Tri-Valley Plumb&Heat               
                                                            PC-013         10,549                  10/25/21   12/08/22    Tri-Valley Plumb&Heat               
                                                            PC-017          4,302                  01/27/22   01/25/23    Tri-Valley Plumb&Heat               
                                                            PC-018          1,730                  07/22/22   03/23/23    Tri-Valley Plumb&Heat               
                                                            PC-019          9,271                  07/22/22   03/23/23    Tri-Valley Plumb&Heat               
                                                            PC-020          2,006                  11/25/22   10/24/23    TRI-VALLEY PLUMB&HEAT               
                                                            PC-021         -4,935                  11/25/22   10/24/23    TRI-VALLEY PLUMB&HEAT               
                                                            PC-022            123                  12/23/22   12/11/23    Tri-Valley Plumb&Heat               
                                                            PC-16           3,431                  01/27/22   01/25/23    Tri-Valley Plumb&Heat               
 
20-0887   Reconstruction               0-002-023  05/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1403FP Reconstruction               0-002-FP1  03/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXMartin H Glynn Schl (Sold 12/12):
91-1257   Reconstruction               0-003-003  05/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0403   Reconstruction               0-003-004  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1340   Reconstruction               0-003-005  07/02/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-3           -4,548                  01/18/01   01/08/02    Henderson-Johnson                   
                                                            TS-1           -1,409                  11/01/01   01/08/02    Integrated Systems Communications   
                                                            TS-3            9,399                  11/28/01   02/28/02    GraceCom                            
 
99-1009   Reconstruction               0-003-006  07/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0181   Reconstruction               0-003-007  09/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-9           11,504                  06/04/03   06/12/03    Schenectady Hardware and Electric   
 
03-0537   Reconstruction               0-003-008  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            6,972                  02/03/05   03/02/05    Bunkoff General Contractors         
 
04-1298   Reconstruction               0-003-009  07/28/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FT-1            3,959                  11/29/06   01/09/07    Shaker Flats landscaping            
 
05-0465   Additions and Alterations    0-003-011  02/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            3,436                  01/02/08   01/15/08    Brownell Electric Corp              
                                                            GC-1           -5,910                  01/14/09   05/05/09    AOW ASSOCIATES INC.                 
                                                            MC-1           -2,500                  12/03/07   01/28/08    Harkins Mechanical & Construction   
 
09-0868   Reconstruction               0-003-012  03/31/10  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1              -76                  12/15/10   02/07/11    HENDERSON-JOHNSON CO INC            
 

          XXMartin Van Buren ES (Sold 12/12):
91-1258   Reconstruction               0-004-005  05/15/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0405   Reconstruction               0-004-008  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1341   Reconstruction               0-004-009  07/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1010   Reconstruction               0-004-010  07/07/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-7            9,066                  01/08/03   01/16/03    T. McElligott                       
                                                            MC-9           10,012                  02/28/03   03/11/03    T. McElligott                       
 
00-0182   Reconstruction               0-004-011  09/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-10          10,312                  06/30/03   07/07/03    Schenectady Hardware and Electric   
                                                            GC-2            5,813                  11/28/01   03/01/02    Bunkoff Gen. Contractors            
                                                            GC-3            6,521                  11/28/01   03/01/02    Bunkoff Gen. Contractors            
 
03-0538   Reconstruction               0-004-012  03/25/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elementary/Middle School (G4-8):
91-0508   Reconstruction               0-007-006  12/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0407   Reconstruction               0-007-007  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1342   Reconstruction               0-007-008  07/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1011   Additions and Alterations    0-007-009  07/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0183   Reconstruction               0-007-010  09/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-13           1,094                  03/30/04   04/08/04    Schenectady Hardware & Elec.        
                                                            EC-16           3,479                  09/13/04   10/25/04    Schenectady Hardware & Elec.        
                                                            EC-4            6,493                  06/15/06   06/19/06    Schenectady Hardware and electric   
 
03-0539   Reconstruction               0-007-011  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FC-1           -3,940                  09/30/04   10/14/04    Professional Furnishing Equipment   
                                                            PC-2           -8,286                  02/03/05   03/17/05    Merit Plumbing heating              
 
07-1527   Reconstruction               0-007-012  03/06/08  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0563   Reconstruction               0-007-013  04/08/09  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0385   Reconstruction               0-007-014  02/15/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC1              -308                  12/23/13   02/04/14    T. McElligott, Inc.                 
 
13-0337   Reconstruction               0-007-015  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AE-1            3,696                  11/12/14   12/30/14    Facilities Equipment and Services   
                                                            GC-10          -3,448                  01/16/15   01/22/15    Hoosick Valley Contractors, Inc.    
                                                            WD-1          -12,486                  10/27/14   11/12/14    Hoosick Valley Contractors, Inc.    
 
14-0528   Reconstruction               0-007-016  07/24/15  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            2,812                  11/07/16   11/22/16    Harold R. Clune, Inc.               
                                                            EC-2            1,933                  02/01/17   02/16/17    Harold R. Clune, Inc.               
                                                            GC-3           13,806                  11/14/16   11/22/16    Bast Hatfield, Inc.                 
                                                            GC-5            1,996                  01/12/17   01/27/17    Bast Hatfield, Inc.                 
 
19-1086   Reconstruction               0-007-018  05/08/20  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-001          2,457                  08/12/21   04/20/22    MJ CONTRACTING SERVICES, INC        
                                                            AC-M-01        69,798                  01/27/22   01/27/23    MJs Contr Servs Inc                 
                                                            AC-M-02        24,672                  01/27/22   01/27/23    MJs Contr Servs Inc                 
                                                            AC-M-03         8,134                  01/27/22   01/27/23    MJs Contr Serv Inc                  
                                                            AC-M-06        15,676                  07/22/22   05/22/23    MJs Contrg Servs Inc                
                                                            AD-GC002            0                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            AD-GC003            0                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            ADAC-004        5,287                  07/22/22     /  /      MJ Contrg Servs Inc                 
                                                            ADAC-005        4,541                  07/22/22   05/22/23    MJs Contrg Servs Inc                
                                                            ADEC-003            0                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            ADEC-004            0                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            ADGC-005            0                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            ADGC-006            0                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            ADGC-008            0                  03/15/21   05/13/21    BAST HATFIELD                       
                                                            ADGC-009            0                  03/15/21   05/13/21    BAST HATFIELD                       
                                                            ADGC-024            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-028            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADGC-032            0                  01/27/22   02/01/23    Bast Hatfield                       
                                                            ADPC-003            0                  01/27/21   03/24/21    TRI-VALLEY PLUMBING & HEATING       
                                                            ADPC-013        2,803                  07/22/22   03/23/23    Tri-Valley Plumb&Heat               
                                                            CC-003          7,177                  10/25/21   12/09/22    Tech Bldg Services                  
                                                            CC-011         -8,405                  03/14/22     /  /      Tech Bldg Servs                     
                                                            CC-013          5,268                  03/14/22   02/17/23    Tech Bldg Servs                     
                                                            CC-09           3,372                  03/14/22   02/17/23    Tech Bldg Servs                     
                                                            EC-001         15,611                  09/21/20   11/24/20    HAROLD R. CLUNE, INC.               
                                                            EC-004          1,060                  12/09/20   02/23/21    HAROLD R. CLUNE, INC.               
                                                            EC-006          5,260                  12/18/20   03/08/21    HAROLD R. CLUNE, INC.               
                                                            EC-008         -1,165                  12/18/20   03/08/21    HAROLD R. CLUNE, INC.               
                                                            EC-009         11,656                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            EC-009          5,203                  11/25/22   10/24/23    HAROLD R CLUNE INC                  
                                                            EC-010          9,652                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            EC-012         -1,078                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            EC-013         -4,780                  01/27/21   03/24/21    HAROLD R. CLUNE, INC.               
                                                            EC-017          5,040                  03/15/21   05/13/21    HAROLD R. CLUNE, INC.               
                                                            EC-023          1,293                  07/06/21   03/16/22    Harold R. Clune Inc                 
                                                            EC-027          5,904                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-031          2,370                  10/25/21   12/09/22    Harold Clune, Inc                   
                                                            EC-032          1,699                  10/25/21   12/09/22    Harold Clune, Inc                   
                                                            EC-033         10,320                  01/27/22   01/25/23    Harold Clune Inc                    
                                                            EC-034          2,284                  01/27/22   01/25/23    Harold Clune Inc                    
                                                            EC-036            535                  01/27/22   01/25/23    Harold Clune Inc                    
                                                            EC-041          1,191                  07/22/22   05/04/23    Harold Clune Inc                    
                                                            EC-042          4,629                  07/22/22   05/04/23    Harold Clune Inc                    
                                                            EC-046          7,324                  07/22/22   05/04/23    Harold Clune Inc                    
                                                            EC-047          3,317                  07/22/22   05/04/23    Harold Clune Inc                    
                                                            EC-049          1,603                  07/22/22   03/23/23    Harold Clune Inc                    
                                                            EC-057          7,594                  11/25/22   10/24/23    HAROLD R CLUNE INC                  
                                                            FA-001          1,350                  06/01/21   08/27/21    FS&S                                
                                                            FA-002            784                  06/01/21     /  /      FS&S                                
                                                            FA-003          3,375                  06/01/21   08/27/21    FS&S                                
                                                            FA-004          1,203                  06/01/21   08/27/21    FS&S                                
                                                            FA-005          1,363                  06/01/21   08/27/21    FS&S                                
                                                            FA-010          1,064                  10/25/21   12/09/22    Fire Sec&sound Systems, Inc         
                                                            GC-001            533                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-003          3,275                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-006         -5,550                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-008         13,443                  12/09/20   02/25/21    BAST HATFIELD                       
                                                            GC-010          4,853                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            GC-011          3,239                  12/18/20   03/01/21    BAST HATFIELD                       
                                                            GC-011            318                  06/01/21   09/23/21    BAST HATFIELD                       
                                                            GC-013          1,041                  06/01/21   09/23/21    BAST HATFIELD                       
                                                            GC-015          1,518                  03/15/21     /  /      BAST HATFIELD                       
                                                            GC-016          4,673                  03/15/21   05/13/21    BAST HATFIELD                       
                                                            GC-017         16,243                  03/15/21   05/13/21    BAST HATFIELD                       
                                                            GC-017          8,518                  06/01/21   02/01/22    BAST HATFIELD                       
                                                            GC-018          7,788                  03/15/21   05/13/21    BAST HATFIELD                       
                                                            GC-020          3,453                  06/01/21   07/15/21    Bast Hatfield                       
                                                            GC-021          4,164                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-022         19,105                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-027         10,561                  08/12/21   04/20/22    BAST HATFIELD CONSTRUCTION, LLC     
                                                            GC-032         -2,429                  08/12/21   04/20/22    BAST HATFIELD INC                   
                                                            GC-033          8,308                  08/12/21   04/20/22    BAST HATFIELD INC                   
                                                            GC-037         10,757                  08/12/21   04/20/22    BAST HATFIELD                       
                                                            GC-040        -21,378                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-041         18,200                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-044        -37,258                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-045          3,210                  10/25/21   12/06/22    Bast Hatfield                       
                                                            GC-051          7,894                  01/27/22   02/01/23    Bast Hatfield                       
                                                            GC-054        -17,500                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-055            886                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-058          8,357                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-061          1,520                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-062          1,969                  03/14/22     /  /      Bast Hartfield                      
                                                            GC-062          1,969                  03/14/22   02/22/23    BAST HATFIELD                       
                                                            GC-064         -1,664                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-065         -3,076                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-068         27,339                  03/14/22   02/22/23    Bast Hatfield                       
                                                            GC-073         34,337                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-075          4,621                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-076            826                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-079         32,370                  07/22/22     /  /      Bast Hatfield                       
                                                            GC-080          5,222                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-081         -3,300                  07/22/22   05/22/23    Bast Hatfield                       
                                                            GC-083         49,508                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-084            700                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-087          6,403                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-088            669                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-089         -4,970                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-090          4,128                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-091          3,087                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-092         14,841                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-094          5,432                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-095         -2,627                  11/25/22   09/12/23    BAST HATFIELD                       
                                                            GC-098          9,640                  12/23/22   12/12/23    Bast Hatfield                       
                                                            GC-106          7,255                  12/23/22   12/12/23    Bast Hatfield                       
                                                            MC-001          4,043                  08/12/21   04/19/22    COLLETT MECHANICAL                  
                                                            MC-002         18,932                  10/25/21   12/09/22    Collett Mech                        
                                                            MC-003           -539                  03/15/21   05/13/21    COLLETT MECHANICAL                  
                                                            MC-011          2,681                  01/27/22   01/25/23    Collett Mech                        
                                                            MC-016          6,502                  07/22/22   03/23/23    Collett Mech                        
                                                            MC-018          3,335                  07/22/22   03/23/23    Collett Mech                        
                                                            MC-021          3,683                  11/25/22   10/24/23    COLLETT MECHANICAL                  
                                                            MC-021          3,683                  12/23/22     /  /      Collett Mech                        
                                                            PC-004          1,538                  03/15/21   05/13/21    TRI-VALLEY PLUMBING & HEATING       
                                                            PC-009            935                  08/12/21   04/19/22    TRI VALLEY PLUMB & HEAT             
                                                            PC-010          1,890                  08/12/21   04/19/22    TRI-VALLEY PLUMB & HEAT             
                                                            PC-014          1,000                  10/25/21   12/09/22    Tri-Valley Plumb&Heat               
                                                            PC-015          1,278                  10/25/21   12/09/22    Tri-Valley Plumb&Heat               
 
20-0888   Reconstruction               0-007-019  05/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1413FP Reconstruction               0-007-FP1  03/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXMaintenance Sho - See 3-019-003:
95-0408   Reconstruction               3-005-001  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
09-1407   Reconstruction               3-005-003  05/20/10  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0338   Reconstruction               3-005-004  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            FT-1            8,918                  09/15/14   09/18/14    Shaker Flats Construction, Inc.     
                                                            FT-2           -2,500                  10/27/14   11/12/14    Shaker Flats Landscaping, Inc.      
 

          Maintenance Building:
91-0063   New Construction             3-019-001  08/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0184   Reconstruction               3-019-002  09/28/00  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0889   Reconstruction               3-019-004  05/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
91-1259   Additions and Alterations    5-006-004  06/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0409   Reconstruction               5-006-006  12/27/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1029   Reconstruction               5-006-007  03/26/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1343   Reconstruction               5-006-008  07/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0185   Reconstruction               5-006-009  09/28/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0540   Reconstruction               5-006-010  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BL - 1         -2,000                  08/20/07   08/22/07    TOTAL TOOL LTD.                     
 
07-1528   Reconstruction               5-006-011  03/06/08  NO CHANGE ORDERS ON ELECTRONIC FILE
13-0339   Reconstruction               5-006-012  03/28/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-11            -550                  03/09/15   02/26/16    Hoosick Valley Contractors, Inc.    
                                                            GC-2              354                  08/06/14   08/28/14    Hoosick Valley Contractors, Inc.    
                                                            SC-1          -36,426                  10/14/14   10/16/14    Delsignore Blacktop Paving, Inc.    
 
20-0890   Reconstruction               5-006-015  05/20/21  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage/Concession:
03-0541   New Construction             7-026-001  03/25/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-1             -439                  02/03/05   03/17/05    Merit Plumbing Heating              
 

          District Wide:
91-0613   Reconstruction               7-999-001  01/31/92  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1344   Reconstruction               7-999-002  07/02/99  NO CHANGE ORDERS ON ELECTRONIC FILE
10-0025   Reconstruction               7-999-004  01/25/11  NO CHANGE ORDERS ON ELECTRONIC FILE
10-1012   Reconstruction               7-999-005  05/11/11  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            CC-1           -1,931                  12/22/11   06/28/12    GRACE COM TELECOMMUNICATIONS        
 
12-1181   Reconstruction               7-999-006  06/18/13  NO CHANGE ORDERS ON ELECTRONIC FILE

NEW LEBANON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 10-16-01-04
last updated on 01/10/24
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          W. Howard Elementary School:
90-1785   Reconstruction               0-001-004  07/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0554   Reconstruction               0-001-007  01/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0010   Reconstruction               0-001-008  08/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0490   Additions and Alterations    0-001-009  02/29/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,759                  01/18/02   03/08/02    Hoosick Valley Contractors          
                                                            001            -4,000                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            001           -32,268                  05/26/04   06/04/04    Sunrise Elec.                       
                                                            002             1,153                  10/23/01   02/11/02    Hoosick Valley Contractors          
                                                            002             5,046                  05/26/04   06/04/04    Sunrise Elec.                       
                                                            002           -12,300                  01/18/02   06/04/04    Crisafulli Bros.                    
                                                            003             1,724                  10/23/01   02/11/02    Hoosick Valley Contractors          
                                                            003               786                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            003              -814                  04/17/02   05/10/02    Sunrise Elec.                       
                                                            004            -1,000                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            004           -40,000                  05/26/04   06/04/04    Hoosick Valley Contractors          
                                                            005           -26,200                  10/23/01   02/11/02    Hoosick Valley Contractors          
                                                            006R          -10,461                  01/18/02   02/11/02    Hoosick Valley Contractors          
                                                            1               1,812                  10/23/01   02/11/02    Crisafulli Bros.                    
                                                            AD4B-03         1,228                  04/17/02   05/10/02    Sunrise Elec.                       
 
00-1318   Reconstruction               0-001-010  04/25/01  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1190   Reconstruction               0-001-011  02/27/08  NO CHANGE ORDERS ON ELECTRONIC FILE
09-0192   Reconstruction               0-001-012  11/02/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,738                  08/13/10   09/23/10    BRUNSWICK ELECTRIC INC              
                                                            002            13,948                  08/13/10   09/23/10    BRUNSWICK ELECTRIC INC              
                                                            002            11,834                  08/31/10   09/28/10    Brunswick Electric Inc              
                                                            004             1,994                  10/19/10   11/23/10    BRUNSWICK ELECTRIC INC              
 
09-0403   Reconstruction               0-001-013  12/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01             374                  01/05/11   01/28/11    ROSCH BROTHERS                      
                                                            GC-02          21,298                  01/05/11   01/28/11    ROSCH BROTHERS                      
 
09-0402   Reconstruction               0-001-014  12/01/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          -3,738                  01/05/11   02/16/11    EASTERN BUILDING AND RESTORATION    
 
10-0717   Reconstruction               0-001-015  01/24/11  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0847   Reconstruction               0-001-016  04/17/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            GC-002          1,361                  01/30/13   04/15/13    ROSCH BROTHERS INC                  
                                                            GC-004            728                  09/27/13   11/01/13    Rosch Brothers, Inc.                
                                                            GC-005         25,847                  11/15/13   12/09/13    Rosch Brothers, Inc.                
 
17-1496   Additions and Alterations    0-001-017  03/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-03           9,016                  09/14/20   11/05/20    NEOPLANTA RESTORATION, INC.         
                                                            AC-04          12,415                  09/14/20   11/05/20    NEOPLANTA RESTORATION, INC.         
                                                            AC-06           8,262                  03/11/21   05/04/21    NEOPLANTA RESTORATION, INC.         
                                                            FC-01         -18,660                  01/27/21   04/05/21    JOSEPH FLIHAN CO.                   
                                                            GC-01         -10,000                  08/14/19   09/25/19    JERSEN CONSTRUCTION GROUP,LLC       
                                                            GC-02         -13,744                  03/09/20   07/06/20    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-03          -3,870                  09/14/20   11/12/20    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-11          14,820                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-14          20,960                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-15          15,915                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-16          14,180                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-17          -1,898                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-19            -970                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-20           2,538                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            MC-01         -41,997                  02/11/21   04/08/21    RMB MECHANICAL, INC.                
                                                            PC-01          10,082                  03/11/21   05/04/21    TRI-VALLEY PLUMBING AND HEATING,INC.
                                                            PC-02          10,069                  03/11/21   05/04/21    TRI-VALLEY PLUMBING AND HEATING,INC.
 
18-1057   Reconstruction               0-001-018  08/19/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0376   Reconstruction               0-001-019  01/08/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01          21,300                  12/22/21   01/24/23    GALLO CONSTRUCTION                  
 
22-0640   Reconstruction               0-001-020  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0224FP Reconstruction               0-001-FP1  01/16/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Jr/Sr High School:
90-1786   Reconstruction               0-002-005  07/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0751   Reconstruction               0-002-007  04/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0752   Reconstruction               0-002-008  04/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1433   Reconstruction               0-002-009  05/30/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1589   Reconstruction               0-002-010  05/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1255   Reconstruction               0-002-012  04/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0491   Additions and Alterations    0-002-013  02/29/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -4,000                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            001             4,759                  01/18/02   03/08/02    Hoosick Valley Contractors          
                                                            001           -17,339                  05/26/04   06/15/04    Spencer-Virnoche                    
                                                            001           -91,950                  05/26/04   06/04/04    Zandri Const.                       
                                                            001            -2,800                  05/26/04   06/04/04    Gross Elec.                         
                                                            001           -32,268                  05/25/04   06/04/04    Sunrise Elec.                       
                                                            001            -4,566                  05/25/04   06/04/04    CS Architectural                    
                                                            002            -8,000                  01/28/02   03/08/02    Spencer-Virnoche                    
                                                            002            12,290                  05/26/04   06/04/04    CS Arch. Products                   
                                                            002            -1,430                  05/26/04   06/04/04    Gross Elec.                         
                                                            002             9,298                  05/25/04   06/04/04    Zandri Const.                       
                                                            002             5,046                  05/25/04   06/04/04    Sunrise Elec.                       
                                                            003            -3,338                  01/28/02   03/08/02    Nickerson                           
                                                            003            -5,147                  01/28/02   03/15/02    CS Architectural                    
                                                            003               786                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            003            12,347                  05/26/04   06/04/04    Zandri Const.                       
                                                            003            -3,368                  05/26/04   06/04/04    Gross Elec.                         
                                                            004           -23,948                  01/28/02   03/08/02    CS Architectural                    
                                                            004               994                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            004            -1,000                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            004             7,197                  05/25/04   06/04/04    Zandri Const.                       
                                                            004           -40,000                  05/25/04   06/04/04    Hoosick Valley Contractors          
                                                            004R          120,000                  01/28/02   06/07/04    Gross Elec.                         
                                                            005             4,464                  01/28/02   03/08/02    Crisafulli Bros.                    
                                                            005             8,263                  01/18/02   03/08/02    Gross Elec.                         
                                                            005            -1,048                  05/25/04   06/04/04    Zandri Const.                       
                                                            006             9,369                  01/18/02   03/08/02    Gross Elec.                         
                                                            006             5,836                  04/17/02   05/10/02    Crisafulli Bros.                    
                                                            006            19,000                  05/26/04   06/04/04    Zandri Const.                       
                                                            006R          -10,461                  01/18/02   03/08/02    Hoosick Valley Cont.                
                                                            007             3,975                  01/18/02   03/08/02    Gross Elec.                         
                                                            007            76,260          76,260  05/26/04   Disapproved Zandri Const.                       
                                                            008             2,538                  01/18/02   03/08/02    Gross Elec.                         
                                                            008            15,685                  05/25/04   06/04/04    Zandri Const.                       
                                                            009             6,147                  01/28/02   03/08/02    Gross Elec.                         
                                                            009             2,431           2,431  05/26/04   Disapproved Zandri Const.                       
                                                            01             -1,650                  05/26/04   06/04/04    Holyoke Equip.                      
                                                            01             -1,357                  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            010             3,817                  04/17/02   05/10/02    Gross Elec.                         
                                                            010             1,000                  05/26/04   06/04/04    Zandri Const.                       
                                                            011             2,722                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            011             3,336                  05/26/04   06/04/04    Zandri Const.                       
                                                            012              -116                  01/28/02   03/08/02    Crisafulli Bros.                    
                                                            012             1,538                  05/26/04   06/04/04    Zandri Const.                       
                                                            013             1,764                  05/26/04   06/04/04    Zandri Const.                       
                                                            014               402                  05/25/04   06/04/04    Zandri Const.                       
                                                            015             1,743                  05/25/04   06/04/04    Zandri Const.                       
                                                            016            19,671                  05/25/04   06/04/04    Zandri Const.                       
                                                            017             1,053                  05/26/04   06/04/04    Zandri Const.                       
                                                            018             6,864           6,864  05/26/04   Disapproved Zandri Const.                       
                                                            02              5,060           5,060  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            02             -3,628                  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            02            -12,300                  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            026             1,922                  10/23/01   02/11/02    Zandri Const.                       
                                                            027            -3,005                  01/18/02   03/08/02    Zandri Const.                       
                                                            028             9,995                  01/18/02   03/08/02    Zandri Const.                       
                                                            029             9,546                  12/05/05   12/06/05    Zandri Construction Corp.           
                                                            03              2,468                  10/23/01   02/11/02    Crisafulli Bros.                    
                                                            03              1,166                  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            030             9,205                  01/18/02   03/08/02    Zandri Const.                       
                                                            031             9,909                  01/18/02   03/08/02    Zandri Const.                       
                                                            032             9,842                  01/18/02   03/08/02    Zandri Const.                       
                                                            033             2,651                  01/18/02   03/08/02    Zandri Const.                       
                                                            034            -4,000                  01/18/02   03/08/02    Zandri Const.                       
                                                            04                689                  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            05               -304                  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            06                800                  05/26/04   06/04/04    Crisafulli Bros.                    
                                                            09                916                  10/23/01   02/11/02    Crisafulli Bros.                    
                                                            1              -4,890                  05/26/04   06/04/04    Nickerson Corp                      
                                                            1             -14,000                  05/26/04   06/04/04    USA Remediation                     
                                                            10             40,319                  10/23/01   02/11/02    Crisafulli Bros.                    
                                                            2               6,760           6,760  05/26/04   Disapproved Nickerson Corp.                     
                                                            2R            -30,000                  05/26/04   06/04/04    USA Remediation                     
                                                            AD 2A-06       -3,277                  01/18/02   03/08/02    Crisafulli Bros.                    
                                                            AD10-03        -1,107                  01/18/02   03/08/02    CS Architectural                    
                                                            AD1B-01         3,445                  01/18/02   03/08/02    Hoosick Valley Cont.                
                                                            AD1B-02         3,954                  01/18/02   03/08/02    Hoosick Valley Cont.                
                                                            AD1B-03         1,240                  01/18/02   03/08/02    Hoosick Valley Cont.                
                                                            AD4A-06         2,082                  01/18/02   03/08/02    Gross Elec.                         
                                                            AD4B-02         1,288                  01/18/02   03/08/02    Sunrise Elec.                       
                                                            PCO39             628                  01/18/02     /  /      Gross Elec.                         
 
08-0958   Reconstruction               0-002-014  03/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0909   Reconstruction               0-002-015  05/22/12  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0576   Reconstruction               0-002-016  12/26/12  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             3,958                  10/09/12   02/22/13    ROSCH BROTHERS INC                  
                                                            GC-003         46,180                  05/15/13   07/10/13    Rosch Brothers, Inc.                
 
13-0109   Reconstruction               0-002-018  09/26/14  NO CHANGE ORDERS ON ELECTRONIC FILE
13-1184   Reconstruction               0-002-019  10/01/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             7,800                  09/10/14   10/23/14    Mid-State Industries, Ltd.          
                                                            002             3,115                  09/19/14   10/23/14    Mid-State Industries, Ltd.          
 
13-1482   Reconstruction               0-002-020  04/07/14  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            GC-001            597                  08/08/14   09/19/14    Sam Greco Construction, Inc.        
                                                            GC-002            810                  08/08/14   09/19/14    Sam Greco Construction, Inc.        
                                                            GC-003          1,822                  08/08/14   09/19/14    Sam Greco Construction, Inc.        
                                                            GC-004            404                  08/08/14   09/19/14    Sam Greco Construction, Inc.        
 
16-1060   Reconstruction               0-002-021  01/11/17  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          -8,500                  05/22/17   06/01/17    TFR Industries, Inc.                
 
17-1497   Reconstruction               0-002-022  03/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-01          -4,187                  09/14/20   11/05/20    NEOPLANTA RESTORATION, INC.         
                                                            AC-02           7,309                  09/14/20   11/05/20    NEOPLANTA RESTORATION, INC.         
                                                            AC-05           4,128                  09/14/20   11/05/20    NEOPLANTA RESTORATION, INC.         
                                                            GC-04           8,912                  09/14/20   11/12/20    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-05          33,868                  10/07/20   02/09/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-06          12,587                  09/29/20   02/09/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-07          25,583                  12/11/20   03/10/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-08           4,934                  12/11/20   03/09/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-09          27,500                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-10          17,775                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-12          20,866                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-13           6,217                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
                                                            GC-18         -10,937                  02/11/21   04/08/21    JERSEN CONSTRUCTION GROUP, LLC      
 
18-1058   Reconstruction               0-002-023  08/19/19  NO CHANGE ORDERS ON ELECTRONIC FILE
20-0377   Reconstruction               0-002-024  01/08/21  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01         -58,600                  03/03/22   12/20/22    John Danforth                       
                                                            PC-2           -1,385                  03/03/22   12/20/22    John Danforth                       
 
22-0933   Reconstruction               0-002-025  02/09/22  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-01          -6,345                  06/14/23   12/28/23    T.MCELLIGOTT                        
 
22-0641   Reconstruction               0-002-027  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE
23-0150   Reconstruction               0-002-028  09/22/23  NO CHANGE ORDERS ON ELECTRONIC FILE

          XXElementary School Demolished 2012:
06-0173   Reconstruction               2-004-003  08/17/06  NO CHANGE ORDERS ON ELECTRONIC FILE
11-0150   Reconstruction               2-004-004  11/17/11  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Modular Storage Bldg:
17-1498   New Construction             2-013-001  03/05/19  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           2,200                  06/12/20   07/20/20    Flex Electric                       
                                                            EC-02         -28,856                  03/11/21   05/04/21    FLEX ELECTRIC, LLC                  
 

          XXOld Bus Garage (demo'd 2020):
17-1499   Reconstruction               4-007-001  03/05/19  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
94-1181   Reconstruction               5-003-002  03/09/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0492   Reconstruction               5-003-003  02/29/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1319   Reconstruction               5-003-004  04/25/01  NO CHANGE ORDERS ON ELECTRONIC FILE
08-0959   Additions and Alterations    5-003-005  03/13/09  NO CHANGE ORDERS ON ELECTRONIC FILE
12-0718   Reconstruction               5-003-006  10/03/13  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-01           1,388                  06/25/15   07/07/15    Stilsing Electric                   
                                                            EC-02           2,015                  06/25/15   07/07/15    Stilsing Electric                   
                                                            EC-03           1,262                  06/25/15     /  /      Stilsing Electric                   
                                                            GC-001         10,575                  11/15/13   12/05/13    Wm.J. Keller & Sons                 
                                                            GC-001        -10,462                  03/20/14   04/15/14    Hoosick Valley Contractors, Inc.    
                                                            GC-002          1,661                  03/20/14   04/15/14    Hoosick Valley Contractors Inc.     
                                                            GC-003          4,959                  04/09/14   05/08/14    Hoosick Valley Contractors, Inc.    
                                                            GC-005            393                  05/20/14   06/30/14    Hoosick Valley Contractors Inc.     
                                                            GC-006          4,778                  05/20/14   06/30/14    Hoosick Valley Contractors, Inc.    
                                                            GC-007            939                  05/20/14   06/30/14    HOOSICK VALLEY CONTRACTORS INC      
                                                            GC-008          2,614                  05/27/14   06/30/14    Hoosick Valley Contractors, Inc.    
                                                            GC-013            291                  08/15/14   09/02/14    Hoosick Valley Contractors Inc.     
                                                            PC-001          1,286                  04/09/14   05/08/14    Mazone Plumbing & Heating Inc.      
                                                            PC-002          2,212                  04/09/14   05/08/14    Mazone Plumbing & Heating Inc.      
                                                            PC-003          2,235                  05/20/14   06/30/14    Mazone Plumbing & Heating, Inc.     
                                                            PC-004         -1,286                  05/20/14   06/30/14    Mazone Plumbing & Heating, Inc.     
                                                            PC-005         -1,288                  05/20/14   06/30/14    Mazone Plumbing & Heating, Inc.     
                                                            PC-006           -337                  05/27/14   06/30/14    Mazone Plumbing & Heating, Inc.     
                                                            PC-007          5,868                  12/23/14   01/07/15    Mazone Plumbing & Heating Inc.      
 
22-0642   Reconstruction               5-003-008  04/25/23  NO CHANGE ORDERS ON ELECTRONIC FILE