ERIE COUNTY

ALDEN 140101
AMHERST 140201
WILLIAMSVILLE 140203
SWEET HOME 140207
EAST AURORA 140301
BUFFALO 140600
CHEEKTOWAGA 140701
MARYVALE 140702
CLEVELAND HILL 140703
DEPEW 140707
SLOAN 140709
CLARENCE 140801
SPRINGVILLE-GR 141101
EDEN 141201
IROQUOIS 141301
EVANS-BRANT 141401
GRAND ISLAND 141501
HAMBURG 141601
HOPEVALE 141603
FRONTIER 141604
HOLLAND 141701
LACKAWANNA 141800
LANCASTER 141901
AKRON 142101
NORTH COLLINS 142201
ORCHARD PARK 142301
TONAWANDA 142500
KENMORE 142601
WEST SENECA 142801
ERIE 1 BOCES 149100
ERIE 2 BOCES 149200
















Overdue Final Cost Reports

Final Cost Reports Due No Later than June 30, 2005

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 12/22/05 at 19:41:35




ALDEN CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-01-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




AMHERST CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-02-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WILLIAMSVILLE CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-02-03-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           Heim Middle School 7:
98-1472    Reconstruction               0-007-007  08/05/99   16                             0      170,000     /  /                /  /       /  /      03/11/03  MGL


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SWEET HOME CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-02-07-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EAST AURORA UFSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-03-01-03
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BUFFALO CITY SCHOOLS FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-06-00-01
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           Campus School East:
00-1877    Additions and Alterations    0-089-011  12/10/01   02 - 16                        0   13,915,000     /  /                /  /       /  /      12/29/03  BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CHEEKTOWAGA CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-07-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CHEEKTOWAGA-MARYVALE UFSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-07-02-03
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CLEVELAND HILL UFSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-07-03-02
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




DEPEW UFSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-07-07-03
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CHEEKTOWAGA-SLOAN UFSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-07-09-03
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




CLARENCE CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-08-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




SPRINGVILLE-GRIFFITH INST. CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-11-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EDEN CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-12-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




IROQUOIS CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-13-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




EVANS-BRANT CSD (LAKE SHORE CSD) FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-14-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




GRAND ISLAND CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-15-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HAMBURG CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-16-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HOPEVALE UFSD AT HAMBURG FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-16-03-02
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




FRONTIER CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-16-04-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




HOLLAND CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-17-01-04
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LACKAWANNA CITY SCHOOLS FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-18-00-01
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




LANCASTER CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-19-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




AKRON CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-21-01-04
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




NORTH COLLINS CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-22-01-04
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




ORCHARD PARK CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-23-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




TONAWANDA CITY SCHOOLS FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-25-00-01
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           Junior Senior High School:
99-0049    Reconstruction               0-001-008  10/28/99   155,15,16                      0    1,128,173     /  /                /  /       /  /      09/15/01  BJB

           Fletcher Elem. School:
99-0050    Reconstruction               0-005-006  10/28/99   155,15,16                      0      410,196     /  /                /  /       /  /      09/15/01  BJB

           Highland Elementary:
99-0051    Reconstruction               0-006-009  10/28/99   155,15,16                      0      321,693     /  /                /  /       /  /      09/15/01  BJB

           Mullen Elementary:
99-0052    Reconstruction               0-007-007  10/28/99   155,15,16                      0      160,819     /  /                /  /       /  /      09/15/01  BJB

           Riverview Elementary:
99-0053    Reconstruction               0-009-006  10/28/99   155,15,16                      0      229,531     /  /                /  /       /  /      09/15/01  BJB


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




KENMORE UFSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-26-01-03
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




WEST SENECA CSD FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-28-01-06
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES ERIE I FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-91-00-00
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition




BOCES ERIE II-CHAUTAUQUA-CATTARAUGUS FINAL COST REPORTS DUE JUNE 30, 2005 FOR CAPITAL PROJECTS
District No.: 14-92-00-00
last updated on 12/22/05
REVIEW     BUILDING NAME/               BLDG./     NYSED                            FINAL        ESTIMATED    FCR       FCR       FCR TO     FCR TO      SUBST.    PRJ.
NUMBER     PROJECT SCOPE                PROJ. NO.  APPROVAL   CSI CODES             COST         COST         APPROVED  REVIEWER  STATE AID  PROJ. MGR.  COMPLETE  MGR.
______________________________________________________________________________________________________________________________________________________________________

           NO FINAL COST REPORTS DUE:
  -        FOR THIS DISTRICT                         /  /                                    0            0     /  /                /  /       /  /        /  /       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition